Powered by Deep Web Technologies
Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Table B8. Year Constructed, Number of Buildings, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings, 1999" B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,227,270,359,321,367,413,390 "5,001 to 10,000 ..............",1110,107,102,240,166,193,156,145 "10,001 to 25,000 .............",708,63,90,97,84,130,179,65 "25,001 to 50,000 .............",257,13,20,39,53,44,43,44 "50,001 to 100,000 ............",145,7,9,19,24,26,33,27

2

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2003" "All Buildings* ...............",4645,330,527,562,579,731,707,876,334 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,174,315,331,298,350,438,481,165 "5,001 to 10,000 ..............",889,71,107,90,120,180,98,158,66 "10,001 to 25,000 .............",738,55,64,90,95,122,103,151,58 "25,001 to 50,000 .............",241,19,23,26,33,48,32,39,21

3

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

4

Property:Building/YearConstruction2 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction2 YearConstruction2 Jump to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "Building/YearConstruction2" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1921 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 +

5

Property:Building/YearConstruction1 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction1 YearConstruction1 Jump to: navigation, search This is a property of type Date. Year of construction 1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "Building/YearConstruction1" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 27 June 2013 21:11:42 + Sweden Building 05K0003 + 27 June 2013 21:10:49 + Sweden Building 05K0005 + 27 June 2013 21:11:38 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1972 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 2004 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1992 +

6

Property:Building/YearConstruction | Open Energy Information  

Open Energy Info (EERE)

YearConstruction YearConstruction Jump to: navigation, search This is a property of type Date. Year of construction Pages using the property "Building/YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 + Sweden Building 05K0017 + 1987 +

7

Buildings","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace, 1999" B9. Year Constructed, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",67338,4034,6445,9127,10866,11840,13931,11094 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,655,798,1025,928,1056,1153,1159 "5,001 to 10,000 ..............",8238,791,776,1777,1165,1392,1150,1188 "10,001 to 25,000 .............",11153,972,1504,1488,1267,2045,2767,1110 "25,001 to 50,000 .............",9311,489,673,1343,1987,1587,1594,1638

8

Data:F358e502-527d-49b0-b8e7-16ce8282b8fb | Open Energy Information  

Open Energy Info (EERE)

8e502-527d-49b0-b8e7-16ce8282b8fb 8e502-527d-49b0-b8e7-16ce8282b8fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Renewable Resource Energy Service Rider - Schedule 32 Sector: Description: APPLICABLE In all territory served. AVAILABILITY OF SERVICE Renewable Resource Energy service is available in accordance with the terms of this tariff rider to any customer purchasing retail electric service under a rate schedule listed on Sheet No. 23A of this rider subject to Kenergy's general rules and regulations on file with the Public Service Comrnission of Kentucky. For purposes of this renewable resource energy service tariff rider, (i) the term "Renewable Resource Energy" means electric energy produced from solar, wind, ocean, geothermal energy, biomass, or landfill gas, and (ii) the term "biomass" means any organic material that is available on a renewable or recurring basis, including dedicated energy crops, trees grown for energy production, wood waste and wood residues, plants (including aquatic plants, grasses, and agricultural crops), residues, fibers, animal wastes and other organic waste materials (but not including unsegregated municipal solid waste (garbage)), and fats and oils. CONDITIONS OF SERVICE (1) Renewable Resource Energy service availability is contingent upon the availability from ' Kenergy's wholesale power supplier of a wholesale supply of Renewable Resource Energy in the quantity and at the quality requested by a customer. (2) Subject to the other requirements of this tariff rider, Kenergy will make Renewable Resource Energy service available to a customer if the customer signs a Renewable Resource Energy service contract in the form attached to this tariff rider agreeing to purchase a specified number of 100 KWH blocks of Renewable Resource Energy per month for a period of not less than one year, and that contract is accepted by Kenergy's wholesale power supplier. Kenergy will have the right, but not the obligation, to terminate a Renewable Resource Energy service contract at the request of the customer before the end of the contract term.

9

Table HC1-2a. Housing Unit Characteristics by Year of Construction,  

U.S. Energy Information Administration (EIA) Indexed Site

2a. Housing Unit Characteristics by Year of Construction, 2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New England .............................. 5.4 0.4 0.7 0.4 0.8 0.9 2.3 11.3 Middle Atlantic ............................ 14.8 1.1 1.7 1.7 2.0 2.2 6.2 11.2 Midwest ......................................... 24.5 2.8 3.7 3.6 2.9 3.5 8.1 10.2 East North Central ...................... 17.1 2.0 2.5 2.5 2.0 2.6 5.5 11.9

10

Data:Eefdadb0-b090-4d08-b8fd-3293349ac6da | Open Energy Information  

Open Energy Info (EERE)

Eefdadb0-b090-4d08-b8fd-3293349ac6da Eefdadb0-b090-4d08-b8fd-3293349ac6da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Decorative Security Lights- (100W HPS Colonial Wood) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

11

Data:48f800fa-1c0f-4e65-af12-7b8f44d19b8f | Open Energy Information  

Open Energy Info (EERE)

00fa-1c0f-4e65-af12-7b8f44d19b8f 00fa-1c0f-4e65-af12-7b8f44d19b8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting 250 W HPS: Unmetered Sector: Lighting Description: Available to individual consumers and municipalities, towns, and villages for dusk to dawn outdoor lighting in close proximity to existing overhead secondary circuits. South Dakota Sales Tax is applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

12

Data:002661b8-2e71-48b8-b657-44ff7372f757 | Open Energy Information  

Open Energy Info (EERE)

b8-2e71-48b8-b657-44ff7372f757 b8-2e71-48b8-b657-44ff7372f757 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation and Grain-Drying Service I-4 (15, 16)- No Control Days - With No Capacitor Sector: Residential Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

13

GRR/Elements/3-FD-b.8 - Conduct Royalty Evaluation | Open Energy...  

Open Energy Info (EERE)

Home Roadmap Help List of Sections 3-FD-b.8 - Conduct Royalty Evaluation The Office of Natural Resources Revenue (ONRR), formerly Minerals Management Service, reviews royalty rate...

14

Be7(p,gamma)B8 and the high-energy solar neutrino flux  

E-Print Network (OSTI)

The importance of the Be7(p,gamma)B8 reaction in predicting the high-energy solar neutrino flux is discussed. I present a microscopic eight-body model and a potential model for the calculation of the Be7(p,gamma)B8 cross section.

Attila Csoto

1997-04-23T23:59:59.000Z

15

Data:90589092-7b73-4dc4-9358-517668b323b8 | Open Energy Information  

Open Energy Info (EERE)

589092-7b73-4dc4-9358-517668b323b8 589092-7b73-4dc4-9358-517668b323b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OL - Outdoor Lighting 100 watt sodium vapor Sector: Lighting Description: Availability Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial or industrial customer located adjacent to an electric distribution line of Utility. Character of Service Outdoor Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html

16

Data:Fbf5b10b-8e51-4769-b8d7-452a8107dc66 | Open Energy Information  

Open Energy Info (EERE)

Fbf5b10b-8e51-4769-b8d7-452a8107dc66 Fbf5b10b-8e51-4769-b8d7-452a8107dc66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights - 400 Watt MH Vapor - Non-Metered Sector: Lighting Description: Wood Pole Charge - $2.00 Fiberglass Pole - $10.00/fixture for 60 months Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

17

Data:0463075f-8098-4bfe-b8b8-595d255525e5 | Open Energy Information  

Open Energy Info (EERE)

8098-4bfe-b8b8-595d255525e5 8098-4bfe-b8b8-595d255525e5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

18

Data:45280b41-235b-4862-b5e2-8ca4b8c88b8e | Open Energy Information  

Open Energy Info (EERE)

b41-235b-4862-b5e2-8ca4b8c88b8e b41-235b-4862-b5e2-8ca4b8c88b8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: REPS Rider- Industrial Sector: Industrial Description: Service supplied to the City's retail customers is subject to a REPS Monthly Charge applied to each customer agreement for service on a residential, general service, or industrial service rate schedule. This charge is adjusted annually, pursuant to North Carolina General Statute 62-133.8 and North Carolina Utilities Commission Rule R8-67 as ordered by the North Carolina Utilities Commission. This Rider is not applicable to agreements for the City's outdoor lighting rate schedules, OL, PL, or FL, nor for services defined as auxiliary to another agreement. An auxiliary service is defined as a non-demand metered, nonresidential service, at the same premises, and with the same service address and same account name as the customer of record.

19

Data:4e782282-f5b8-42ca-b10b-8d490b1894f8 | Open Energy Information  

Open Energy Info (EERE)

82-f5b8-42ca-b10b-8d490b1894f8 82-f5b8-42ca-b10b-8d490b1894f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2013/07/01 End date if known: Rate name: Dusk To Dawn Outdoor Security Lighting Z-4 MH 1000 W Sector: Lighting Description: Any customer for dusk to dawn outdoor security lighting where customer takes service at the same premises under a standard rate schedule. Additions to mercury vapor lighting services are closed to new customers. Daily from dusk to dawn. Single-phase, alternating current, 60 hertz, nominally at l20 volts. Type of Facility Monthly Charge Additional Wood Pole $3.80/pole Span of Conductor (200 feet) $2.74/span

20

Data:88de88e4-d7fe-4b8f-830b-8c4223d97a0c | Open Energy Information  

Open Energy Info (EERE)

de88e4-d7fe-4b8f-830b-8c4223d97a0c de88e4-d7fe-4b8f-830b-8c4223d97a0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Rural Residential-Three Phase ST Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Annual credit for a load leveler installation after 200 KWH/KW/12 Mo. $0.024/KWH (The homeowner determines his maximum KW demand level that the machine will allow during peak period.) (Closed)

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Data:Bfec0164-00b8-4446-988f-bf4b8b4328fa | Open Energy Information  

Open Energy Info (EERE)

Bfec0164-00b8-4446-988f-bf4b8b4328fa Bfec0164-00b8-4446-988f-bf4b8b4328fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, Mercury Vapor Security Light, 175W (New Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

22

Data:7e5208d9-9323-403b-8fa0-7668b8b7428c | Open Energy Information  

Open Energy Info (EERE)

08d9-9323-403b-8fa0-7668b8b7428c 08d9-9323-403b-8fa0-7668b8b7428c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: GENERAL TIME OF DAY SERVICE kWh Metered (A17) Sector: Commercial Description: AVAILABILITY-MANDATORY Effective November 1, 2007, this rate schedule is mandatory for any non-residential customer for general service having a 15-minute measured demand equal to or greater than 1,000 kW for at least 4 of the past 12 consecutive months. Customer will remain on this rate schedule on a mandatory basis unless their demand remains below 1,000 kW for 12 consecutive months. AVAILABILITY-OPTIONAL This rate schedule is optional for any non-residential customer for general service where customer is not required to be on a time-of-day rate.

23

Data:E15b8fca-e91d-4d28-8b8f-297225304ec2 | Open Energy Information  

Open Energy Info (EERE)

fca-e91d-4d28-8b8f-297225304ec2 fca-e91d-4d28-8b8f-297225304ec2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/12/19 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-Metal Halide 250W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements. Monthly Usage: 101.8kWh

24

Data:93ee6365-3e0f-45d3-ae09-cc7d28810b8a | Open Energy Information  

Open Energy Info (EERE)

ee6365-3e0f-45d3-ae09-cc7d28810b8a ee6365-3e0f-45d3-ae09-cc7d28810b8a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Sodium Vapor, 8700 Lumen, 100 watts, Class C Sector: Lighting Description: Class C: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead concrete pole construction or on existing metal pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments

25

Data:D88b8b64-c0d8-4088-b5d6-fd501b8fffa3 | Open Energy Information  

Open Energy Info (EERE)

b64-c0d8-4088-b5d6-fd501b8fffa3 b64-c0d8-4088-b5d6-fd501b8fffa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/06/01 End date if known: Rate name: Outdoor Lighting HPS-9 100 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company. Source or reference: https://www.otpco.com/RatesPricing/Documents/PDF/MN/MN_11.04.pdf

26

Data:68986151-24b8-4f41-9046-2b62dfcefaeb | Open Energy Information  

Open Energy Info (EERE)

-24b8-4f41-9046-2b62dfcefaeb -24b8-4f41-9046-2b62dfcefaeb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING SCHEDULE HPS 250 W 6 Lots Sector: Lighting Description: 6 lots per light Type: HPS 250 W AVAILABILITY: Available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. This is an experimental rate. Participation is limited to four developments during the first year trial period. APPLICABILITY: This schedule is applicable for lighting of residential streets within residential subdivisions. Applicability is limited to residential subdivisions consisting of single family dwellings where permanent electric facilities have been installed, located outside of the corporate limits of a city or town where installations are not prevented or regulated by any governmental unit having jurisdiction.

27

Data:6211d159-b8bf-4072-af2e-ead5977c59bc | Open Energy Information  

Open Energy Info (EERE)

1d159-b8bf-4072-af2e-ead5977c59bc 1d159-b8bf-4072-af2e-ead5977c59bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Wheatland, Wyoming (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Irrigation Time-Of-Day Sector: Commercial Description: To irrigators pumping irrigation water. Facilities Charge: $3.39 per Installed HP/Year which is to be billed in July. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_whe1/0001a.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

28

Data:2b653ddc-9b6d-41b8-9524-866c0e2d48ea | Open Energy Information  

Open Energy Info (EERE)

ddc-9b6d-41b8-9524-866c0e2d48ea ddc-9b6d-41b8-9524-866c0e2d48ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Standard Security Lights- (100W HPS) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

29

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

"District Heat ...",5166,"Q",1203,661,786,573,780,691,"Q" "Boilers ...",20423,1926,2744,3081,2957,3339,2803,2257,1316 "Packaged...

30

Data:Ca6c8920-b07c-49b8-ae8c-3262232c4ac1 | Open Energy Information  

Open Energy Info (EERE)

c8920-b07c-49b8-ae8c-3262232c4ac1 c8920-b07c-49b8-ae8c-3262232c4ac1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Directional Flood 400 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

31

Data:94cefde0-6e62-44b8-b796-c417050ddfd8 | Open Energy Information  

Open Energy Info (EERE)

cefde0-6e62-44b8-b796-c417050ddfd8 cefde0-6e62-44b8-b796-c417050ddfd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: 31 Sector: Commercial Description: To service through one meter for pumping water or water effluents, including incidental power used for other equipment and lighting essential to the pumping operation. For such incidental service, Customer will furnish any transformers and other necessary equipment. Customer will enter into a written contract for five (5) years or longer and will have service available on a continuous basis unless there is a change in ownership or control of property served.

32

Data:E51ea169-ce22-4885-b9b8-e1228a55b87a | Open Energy Information  

Open Energy Info (EERE)

69-ce22-4885-b9b8-e1228a55b87a 69-ce22-4885-b9b8-e1228a55b87a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Outdoor Lighting Rate--Schedule LS Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations, and outdoor lighting for individual customers. Service under this schedule is for a term of not less than 1 year. Source or reference: http://www.jwemc.org/rateforms.aspx Source Parent: Comments String representation "The annual faci ... g installation." is too long.

33

Data:D942da7f-3948-404f-b8aa-0d1a455220e0 | Open Energy Information  

Open Energy Info (EERE)

da7f-3948-404f-b8aa-0d1a455220e0 da7f-3948-404f-b8aa-0d1a455220e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sullivan, Illinois (Utility Company) Effective date: 2012/11/13 End date if known: Rate name: Commercial All Electric (Including Heat) - Year Round Rate: Three Phase - 2000-2500 kva installation Sector: Commercial Description: For customers with usage of less than twenty-five thousand (25,000) KWH per month and certain seasonal customers such as grain elevators and fertilizer plants. Source or reference: http://www.sullivanil.us/government.html Source Parent: Comments

34

Data:8d87b4b8-b5b5-4c46-9ed6-cebef387c342 | Open Energy Information  

Open Energy Info (EERE)

b4b8-b5b5-4c46-9ed6-cebef387c342 b4b8-b5b5-4c46-9ed6-cebef387c342 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2010/04/25 End date if known: Rate name: Controllable Irrigation, 11 to 25 HP Sector: Commercial Description: * Available to members of the Cooperative for pump irrigation service located adjacent to its three-phase lines. Total load during peak period for up to four(4) hours per day and not to exceed 30 days per year. Subject to Power Factor Adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW)

35

Gravel road test sections insulated with scrap tire chips: Construction and the first year's results. Special report  

Science Conference Proceedings (OSTI)

A test project that uses tire chips as an insulating layer to limit frost penetration beneath a gravel-surfaced road is described. Tire chips, which are waste tires that have been cut into 2-in. pieces, are an attractive alternative to conventional insulation boards because they have moderate thermal resistance and are durable, free-draining and low cost. Furthermore, this application has the potential to make an important contribution to disposing of the more than 2 billion waste tires that are currently sitting in huge open piles across the U.S. The project was constructed in Richmond, Maine, in August 1992. It is 750 ft long, consisting of five sections with different thicknesses of tire chips and overlying soil cover and two control sections. Over 20,000 waste tires were used on this project. The primary goals were to determine the necessary thickness of tire chips to provide effective insulation and the minimum thickness of overlying soil cover needed to produce a stable riding surface. The thickness of the tire chip layers ranges from 6 to 12 in., while the thickness of the granular soil cover ranges from 12 to 24 in. The project is instrumented with thermocouples, resistivity gauges, groundwater monitoring wells and a weather station. In addition, the strength of the road surface is periodically measured with a heavy weight deflectometer. Results from the first year of service have shown that a 6-in. tire chip layer can reduce frost penetration by up to 25% and the gravel cover should be 12 to 18 in. thick to provide a stable riding surface.

Eaton, R.A.; Roberts, R.J.; Humphrey, D.N.

1994-08-01T23:59:59.000Z

36

Pages that link to "Data:48839eaa-6525-4747-b8fe-f942051fcee9...  

Open Energy Info (EERE)

-4747-b8fe-f942051fcee9: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Oak Ridge, Tennessee (Utility Company) ( links) View (previous 50 | next 50) (20 |...

37

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

38

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

39

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

40

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:B7e116a6-94ed-4c6b-8cf7-fcdfb9cc68f5 | Open Energy Information  

Open Energy Info (EERE)

6a6-94ed-4c6b-8cf7-fcdfb9cc68f5 6a6-94ed-4c6b-8cf7-fcdfb9cc68f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: Street Lighting100 W HPS (175 W MV) Sector: Lighting Description: The Cooperative shall install, own, provide power, and service the lights included in this rate. The installation shall include wood poles, and it is assumed that an existing transformer can be used to provide secondary service. If a separate transformer is required and/or decorative lighting is requested by the member, the Cooperative may require an aid to construction to cover the added expense or negotiate a special rate to include the added costs incurred by the Cooperative.

42

Data:9057e0f6-b83c-41ad-8708-cdaeb0d13b8e | Open Energy Information  

Open Energy Info (EERE)

e0f6-b83c-41ad-8708-cdaeb0d13b8e e0f6-b83c-41ad-8708-cdaeb0d13b8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Private Lighting 400 W HPS L-3 Sector: Lighting Description: New Lighting systems shall be overhead construction consisting of wood poles, aerial circuits, and conventional street lighting luminaries with mast arms not longer than ten feet, or floodlighting luminaries with no mast arms. The installed luminaries shall use low-pressure sodium lamps. All equipment used to provide service under this schedule will be furnished, owned, operated and maintained by the Springfield Utility Board.

43

Data:F13cfe3d-2289-4ab9-b404-7b8fe635cf67 | Open Energy Information  

Open Energy Info (EERE)

cfe3d-2289-4ab9-b404-7b8fe635cf67 cfe3d-2289-4ab9-b404-7b8fe635cf67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Greater than 10 kVa, IDR Metered, greater than 2000 kVa (TC-LOS-A) Sector: Commercial Description: Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour Meter provided for this type of Delivery Service. Any other metering option(s) will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, in this Tariff.

44

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

45

Data:53226e8c-ff9c-4024-b376-22b8b6b08988 | Open Energy Information  

Open Energy Info (EERE)

e8c-ff9c-4024-b376-22b8b6b08988 e8c-ff9c-4024-b376-22b8b6b08988 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kerrville Public Utility Board Effective date: 2000/01/01 End date if known: Rate name: Flood Lights-High Press Sodium Vapor-250 watts Sector: Lighting Description: Applicable throughout the service area to year-round unmetered outdoor security lighting of areas not covered by any other rate schedule. Not applicable to street lighting, standby, shared, or resale service. Service under this rate schedule shall be alternating current, 60 Hertz, single phase. Lamps will be operated from dusk to dawn, or approximately 4,300 hours per year per lamp, and controlled by photoelectric control.

46

Data:0844e1b8-76c2-4b8e-a7f8-1da98cd9ea60 | Open Energy Information  

Open Energy Info (EERE)

e1b8-76c2-4b8e-a7f8-1da98cd9ea60 e1b8-76c2-4b8e-a7f8-1da98cd9ea60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jersey Central Power & Lt Co Effective date: 2006/07/15 End date if known: Rate name: GST (General Service Time-Of-Day) Sector: Commercial Description: APPLICABLE TO USE OF SERVICE FOR: Service Classification GST is available for general Service purposes for commercial and industrial customers establishing demands in excess of 750 KW in two consecutive months during the current 24-month period. Customers which were served under this Service Classification as part of its previous experimental implementation may continue such Service until voluntarily transferring to Service Classification GS. CHARACTER OF SERVICE: Single or three-phase service at secondary voltages. RATE PER BILLING MONTH (All charges include Sales and Use Tax as provided in Rider SUT): All charges are applicable to Full Service Customers. All charges, excluding Basic Generation Service (default service), are applicable to Delivery Service Customers.

47

Data:3d1634ea-5b99-465e-ac3b-6d9d34e9b8b8 | Open Energy Information  

Open Energy Info (EERE)

ea-5b99-465e-ac3b-6d9d34e9b8b8 ea-5b99-465e-ac3b-6d9d34e9b8b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation and Grain-Drying Service I-3 (13, 14)- Three Control Days - With Capacitor Sector: Residential Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

48

Data:6741b13a-3e06-4e8f-b197-82b8d076569d | Open Energy Information  

Open Energy Info (EERE)

41b13a-3e06-4e8f-b197-82b8d076569d 41b13a-3e06-4e8f-b197-82b8d076569d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Medium Industrial- Time-of-Use Sector: Industrial Description: This type of service is Time of Use Demand Rate. Medium and Small Industrial Users may elect and have Time of Use Demand metering. Any such election shall commence with June usage, be for a minimum of one year, and will automatically renew until otherwise canceled. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf

49

Data:D7eba17a-e72f-4475-8173-b8f6ab828b87 | Open Energy Information  

Open Energy Info (EERE)

D7eba17a-e72f-4475-8173-b8f6ab828b87 D7eba17a-e72f-4475-8173-b8f6ab828b87 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Madison, New Jersey (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: General Service (non demand) Sector: Commercial Description: Source or reference: http://www.rosenet.org/uploads/25/ord_2_2009_amending_chap_94_rates_for_electric_01.13..pdf Source Parent: http://www.rosenet.org/gov/mayor-and-council/uploads/index_ord?year=2010 Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

50

Data:Ed3b8e78-f6bb-49fc-85a9-1d7f712481f8 | Open Energy Information  

Open Energy Info (EERE)

b8e78-f6bb-49fc-85a9-1d7f712481f8 b8e78-f6bb-49fc-85a9-1d7f712481f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2002/09/04 End date if known: Rate name: High Load Factor Incentive Service Sector: Commercial Description: Service under this Rate Schedule is available throughout the Cooperative's service area in accordance with the Cooperative's established Rules and Regulations for Electric Service. Service Hereunder is limited to Consumers who require an annual peak demand of at least 1,000 kW, and an annual load factor of at least 60%. In order to receive service under this rate, Consumers will be required to sign an electric service contract with a minimum initial term of three (3) years and requiring a minimum of thirty (30) days advance notice to cancel thereafter.

51

Data:Ceb5eb18-2f20-4726-8787-1e2b8e8f23d3 | Open Energy Information  

Open Energy Info (EERE)

Ceb5eb18-2f20-4726-8787-1e2b8e8f23d3 Ceb5eb18-2f20-4726-8787-1e2b8e8f23d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING SCHEDULE MV 175 W 8 Lots Sector: Lighting Description: Type: MV 175 W AVAILABILITY: Available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. This is an experimental rate. Participation is limited to four developments during the first year trial period. APPLICABILITY: This schedule is applicable for lighting of residential streets within residential subdivisions. Applicability is limited to residential subdivisions consisting of single family dwellings where permanent electric facilities have been installed, located outside of the corporate limits of a city or town where installations are not prevented or regulated by any governmental unit having jurisdiction.

52

Data:6939cbfe-f9d8-4a96-b8ef-6056ccec0dfa | Open Energy Information  

Open Energy Info (EERE)

cbfe-f9d8-4a96-b8ef-6056ccec0dfa cbfe-f9d8-4a96-b8ef-6056ccec0dfa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Wisconsin Effective date: 2012/01/01 End date if known: Rate name: CUSTOMER OWNED STREET LIGHTING SV 50 W Sector: Lighting Description: Availability: Available for year-round illumination of public streets, parkways, and highways by electric lamps mounted on standards where the customer owns and maintains an Ornamental Street Lighting system complete with standards, luminaires with refractors, lamps and other appurtenances, together with all necessary cables extending between standards and to points of connection to Company's facilities as designated by Company. Mercury Vapor street lighting service under this schedule is limited to the luminaires being served as of December 31, 1987.

53

Data:D81660a4-094e-4639-99b0-fb937b8d193d | Open Energy Information  

Open Energy Info (EERE)

660a4-094e-4639-99b0-fb937b8d193d 660a4-094e-4639-99b0-fb937b8d193d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2006/08/01 End date if known: Rate name: LDI Load Density Improvement Rider Sector: Description: (Closed to new customers) To new and existing customers receiving service in Planning Districts 3 East, 4 West, 5 West, 6 and 7 served by JEA. To new or existing customers who have executed a ten year Load Density Improvement Electric Service Agreement with JEA and whose new or modified account qualifies for electric service under Rate Schedule GSD, GSDT, GSLD, and GSLDT. Application to commence service under this Rider after October 1, 2002, will not be accepted. Resale of energy purchased under this rider is not permitted.

54

Data:620c2423-79a9-4a73-b8ff-fb8058aa3131 | Open Energy Information  

Open Energy Info (EERE)

3-79a9-4a73-b8ff-fb8058aa3131 3-79a9-4a73-b8ff-fb8058aa3131 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING SCHEDULE HPS 250 W 7 Lots Sector: Lighting Description: 7 lots per light Type: HPS 250 W AVAILABILITY: Available in all territory served by the Cooperative, subject to the Cooperative's established Service Rules and Regulations. This is an experimental rate. Participation is limited to four developments during the first year trial period. APPLICABILITY: This schedule is applicable for lighting of residential streets within residential subdivisions. Applicability is limited to residential subdivisions consisting of single family dwellings where permanent electric facilities have been installed, located outside of the corporate limits of a city or town where installations are not prevented or regulated by any governmental unit having jurisdiction.

55

Data:Cd4b0261-659d-484c-b8f9-9b2f6975355e | Open Energy Information  

Open Energy Info (EERE)

b0261-659d-484c-b8f9-9b2f6975355e b0261-659d-484c-b8f9-9b2f6975355e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: General Service- Single-Phase- Time-of-Day- Peak: 8am-8pm Sector: Commercial Description: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

56

Data:A2db3312-b61f-4ccf-8b3f-3b52b8babd6e | Open Energy Information  

Open Energy Info (EERE)

db3312-b61f-4ccf-8b3f-3b52b8babd6e db3312-b61f-4ccf-8b3f-3b52b8babd6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service - Optional Time-of-Day Single-Phase 8am-8pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Rg-2 Residential Service Optional TOD $1.00 per customer per month

57

Data:8da86ee0-3394-48bf-91b3-c9b8a446fb3a | Open Energy Information  

Open Energy Info (EERE)

ee0-3394-48bf-91b3-c9b8a446fb3a ee0-3394-48bf-91b3-c9b8a446fb3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Clallam County Effective date: 2012/02/01 End date if known: Rate name: SCHEDULE E-2 AREA LIGHTING SERVICE 200 HPS unmetered Sector: Lighting Description: This Schedule applies to service for exterior lighting through District-owned fixtures. Character of Service The District will furnish, install and maintain standard exterior lighting fixtures and related appurtenances, which shall be and continue to be the property of the District. Installation will only be made after receipt of the installation charge; an additional charge, as set forth in the District's Unit Costs, where a service pole is required for mounting of the fixture; and a contract signed by the property owner guaranteeing payment of the monthly rates for five (5) years.

58

Data:49252138-17b3-47b8-bd30-25340cafdeca | Open Energy Information  

Open Energy Info (EERE)

17b3-47b8-bd30-25340cafdeca 17b3-47b8-bd30-25340cafdeca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Street Lighting (SL) Rate 100 Watt Metal Halide Sector: Lighting Description: For municipal street lighting on city-accepted streets. Source or reference: https://www.burlingtonelectric.com/ELBO/assets/Tariff%20Sheets%20June%20262009%20revised-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

59

Data:48c88673-3978-4f94-b8b7-10288f635996 | Open Energy Information  

Open Energy Info (EERE)

3-3978-4f94-b8b7-10288f635996 3-3978-4f94-b8b7-10288f635996 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered New Pole HPS 150 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

60

Data:341f4cfb-3383-4476-b995-ff18563b8b38 | Open Energy Information  

Open Energy Info (EERE)

cfb-3383-4476-b995-ff18563b8b38 cfb-3383-4476-b995-ff18563b8b38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: Irrigation and Soil Drainage Pumping, Single-Phase Sector: Commercial Description: * Applicable to customers who require single-phase seasonal service for irrigation and soil drainage pumping installations with a connected horsepower load of 7.5 or less. Minimum seasonal charge is $10.00 per horsepower, but not less than $25.00. Source or reference: Illinois State University Source Parent: Comments Applicability

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:56aebb9b-8ade-48be-a87f-92655d2138ca | Open Energy Information  

Open Energy Info (EERE)

aebb9b-8ade-48be-a87f-92655d2138ca aebb9b-8ade-48be-a87f-92655d2138ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 400W HPS- Ornamental Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

62

Data:Fc83962f-30b8-4420-8464-abe452386d8d | Open Energy Information  

Open Energy Info (EERE)

3962f-30b8-4420-8464-abe452386d8d 3962f-30b8-4420-8464-abe452386d8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield MV 400 W Non Wood Pole Sector: Lighting Description: Fixtures No Longer Offered Effective June 1, 2005 Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

63

Data:82698a95-399f-48b8-a792-4168499cc34e | Open Energy Information  

Open Energy Info (EERE)

5-399f-48b8-a792-4168499cc34e 5-399f-48b8-a792-4168499cc34e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-Mercury vapor-Decorative-1,000 watts-Outside Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990.

64

Data:0424192a-b057-4857-b8c8-efc6131d36ea | Open Energy Information  

Open Energy Info (EERE)

92a-b057-4857-b8c8-efc6131d36ea 92a-b057-4857-b8c8-efc6131d36ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 400 watt MH - Cobra Head Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

65

Data:491c73f1-ddce-4570-83dd-0e85759011b8 | Open Energy Information  

Open Energy Info (EERE)

ddce-4570-83dd-0e85759011b8 ddce-4570-83dd-0e85759011b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shelby Energy Co-op, Inc Effective date: 2011/06/01 End date if known: Rate name: Residential Service - Rate 12 Sector: Residential Description: Source or reference: http://www.shelbyenergy.com/yourelectricrate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

66

Data:0fc3ccaf-72ef-430b-8abc-e75868fdd372 | Open Energy Information  

Open Energy Info (EERE)

fc3ccaf-72ef-430b-8abc-e75868fdd372 fc3ccaf-72ef-430b-8abc-e75868fdd372 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sullivan, Illinois (Utility Company) Effective date: 2012/11/13 End date if known: Rate name: Industrial Power - 200,000 KWH or Above Usage Per Month - Single Phase - 250-500 kva Sector: Industrial Description: The City of Sullivan will determine the Power Factor each month and if found to be less than ninety percent (90%), the monthly demand charge may be increased by an amount equal to Twenty Cents ($0.20) per KWH of Demand for each percent, or fraction thereof, for each percent less than ninety percent (90%).

67

Data:3146c592-ceb8-40b8-939d-2250917d2271 | Open Energy Information  

Open Energy Info (EERE)

6c592-ceb8-40b8-939d-2250917d2271 6c592-ceb8-40b8-939d-2250917d2271 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand River Dam Authority Effective date: 2011/07/01 End date if known: Rate name: wholesale power service with customer distribution primary Sector: Commercial Description: Source or reference: http://www.grda.com/electric/customer-service/wholesale-sales/power-service-with-customer-generation/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

68

Data:40519767-a6ba-4ac4-b266-b8d527f70297 | Open Energy Information  

Open Energy Info (EERE)

7-a6ba-4ac4-b266-b8d527f70297 7-a6ba-4ac4-b266-b8d527f70297 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc (Alabama) Effective date: 2012/03/27 End date if known: Rate name: Mercury Lamp 250 Watts Sector: Lighting Description: This rate applies to accounting schedule 444 Street lights. Source or reference: http://www.pioneerelectric.coop/documents/tariff-schedules.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

69

Data:528e39ba-09d1-4908-8b8d-6411d6487072 | Open Energy Information  

Open Energy Info (EERE)

ba-09d1-4908-8b8d-6411d6487072 ba-09d1-4908-8b8d-6411d6487072 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Large Power - 1000 kW - 2999 kW Sector: Industrial Description: Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

70

Data:10096f83-274b-469b-8f04-57cbc2494131 | Open Energy Information  

Open Energy Info (EERE)

f83-274b-469b-8f04-57cbc2494131 f83-274b-469b-8f04-57cbc2494131 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St John, Kansas (Utility Company) Effective date: 2012/03/01 End date if known: Rate name: Experimental Generation User Rate Sector: Description: Effective with billings to all customers subsequent to march 1, 2012, all electric energy purchased from the city by commercial or residential users, who have requested and been approved, for service through the City Interconnect Policy with supplemental generators such as wind turbines or diesel generators shall be billed according to this rate.

71

Data:Cc502779-3532-495b-8a62-212a645009b4 | Open Energy Information  

Open Energy Info (EERE)

532-495b-8a62-212a645009b4 532-495b-8a62-212a645009b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Institutional Service - non-electric Sector: Residential Description: This rate schedule is for three-phase service for a load in excess of 50 KW serving an institution of public, charitable or educational character, excluding industrial and commercial. Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments minimum charge of $330.89

72

Data:038d5ca4-1348-443b-8c38-a11dcda70704 | Open Energy Information  

Open Energy Info (EERE)

ca4-1348-443b-8c38-a11dcda70704 ca4-1348-443b-8c38-a11dcda70704 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kingfisher, Oklahoma (Utility Company) Effective date: 2003/07/25 End date if known: Rate name: Commercial Rate Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

73

Data:Fc2807b8-1936-4001-8cd6-2330a774adea | Open Energy Information  

Open Energy Info (EERE)

b8-1936-4001-8cd6-2330a774adea b8-1936-4001-8cd6-2330a774adea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Lighting Service - Metered Steel or Fiberglass pole - 175W M.V or 100 W HPS Sector: Lighting Description: Available to all consumers and within the Utility's service area, unless otherwise noted. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

74

Data:291808ca-857d-49b8-8d22-bf184005317c | Open Energy Information  

Open Energy Info (EERE)

857d-49b8-8d22-bf184005317c 857d-49b8-8d22-bf184005317c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Battle Creek, Nebraska (Utility Company) Effective date: End date if known: Rate name: Security Lights- Commercial Sector: Lighting Description: Source or reference: ISU Documentation Rate Binder Ted 6 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

75

Data:A0462981-8435-48c7-b49b-8bb006fc1899 | Open Energy Information  

Open Energy Info (EERE)

62981-8435-48c7-b49b-8bb006fc1899 62981-8435-48c7-b49b-8bb006fc1899 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Large Commercial Critical Peak Three Phase Pricing Sector: Commercial Description: Source or reference: http://www.sawnee.com/Rate%20Pdfs/CPPC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

76

Data:4173fd93-6762-497b-95da-1245d16194b8 | Open Energy Information  

Open Energy Info (EERE)

3-6762-497b-95da-1245d16194b8 3-6762-497b-95da-1245d16194b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Interruptible Power - Discretionary(secondary voltage)-supplemental interruptions-Demand charge Sector: Industrial Description: Tiered demand charge Source or reference: https://www.aepohio.com/global/utilities/lib/docs/ratesandtariffs/Ohio/2012-04-05_CSP_OP_StandardTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

77

Data:7d725892-041e-4625-b90b-8fdb94869df6 | Open Energy Information  

Open Energy Info (EERE)

5892-041e-4625-b90b-8fdb94869df6 5892-041e-4625-b90b-8fdb94869df6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Domestic-Summer Load Control-Rate-3,Single Phase Sector: Residential Description: 1. Available to homes,schools,churches and community halls for all uses including mobile homes,who also agree to allow control of air-conditioning system by means of automated load Control Relays and subject to the established rules and regulations of the cooperative. 2. The capacity of individual motors served under this schedule shall not exceed 10 horsepower.

78

Data:53bb78b8-2065-4741-99f1-0014cbdda4fe | Open Energy Information  

Open Energy Info (EERE)

bb78b8-2065-4741-99f1-0014cbdda4fe bb78b8-2065-4741-99f1-0014cbdda4fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Cogeneration and/or Small Power Production -single phase Sector: Commercial Description: This schedule is available to customers with cogeneration and/or small power production (COGEN/SPP) facilities which qualify under Section 210 of the Public Utility Regulatory Policies Act of 1978, and which have a total design capacity of 100 KW or less. Such facilities shall be designed to operate properly in parallel with the Company's system without adversely affecting the operation of

79

Data:93daaacb-08fd-46b7-ba52-f032134ae9b8 | Open Energy Information  

Open Energy Info (EERE)

daaacb-08fd-46b7-ba52-f032134ae9b8 daaacb-08fd-46b7-ba52-f032134ae9b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2012/01/01 End date if known: Rate name: Large Power - Industrial Sector: Industrial Description: *Availability Available for single and three phase commercial, industrial, and non-residential farm services for lighting, heating, and power subject to the established rules and regulations. Subject to Power Cost Adjustment Clause Flat rate Adjustment = Power Cost Adjustment Source or reference: Rate Binder 5, Illinois State University Source Parent:

80

Data:03157ef4-b8e7-4349-82c9-415f10184579 | Open Energy Information  

Open Energy Info (EERE)

ef4-b8e7-4349-82c9-415f10184579 ef4-b8e7-4349-82c9-415f10184579 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Kentucky Power Coop, Inc Effective date: 2013/03/10 End date if known: Rate name: Section C Sector: Description: Available to all cooperative associations which are or shall be members of EKPC and which execute EKPC approved contracts with the ultimate consumers. The electric power and energy furnished hereunder shall be separately metered for each point of delivery Source or reference: http://psc.ky.gov/tariffs/Electric/East%20Kentucky%20Power%20Cooperative,%20Inc/East%20Kentucky%20Power%20Cooperative.pdf

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:663995dd-d34d-4335-b8bd-538564d23ea0 | Open Energy Information  

Open Energy Info (EERE)

dd-d34d-4335-b8bd-538564d23ea0 dd-d34d-4335-b8bd-538564d23ea0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 1000 watt HPS Flood Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

82

Data:2cf3ad84-26b8-4b48-ab0e-ce6ea61b1eb3 | Open Energy Information  

Open Energy Info (EERE)

cf3ad84-26b8-4b48-ab0e-ce6ea61b1eb3 cf3ad84-26b8-4b48-ab0e-ce6ea61b1eb3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Ornamental 150 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

83

Data:4a7ec180-1da2-4eab-94bf-b8d49d2f8963 | Open Energy Information  

Open Energy Info (EERE)

80-1da2-4eab-94bf-b8d49d2f8963 80-1da2-4eab-94bf-b8d49d2f8963 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Three Phase(9am-9pm) with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Pricing Periods: On-peak: The three on-peak periods available are: 7:00 a.m. to 7:00 p.m. 8:00 a.m. to 8:00 p.m. 9:00 a.m. to 9:00 p.m. Monday through Friday, excluding holidays, specified below. Off-peak: All times not specified as on-peak including all day Saturday and Sunday, and the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, or the day designated to be celebrated as such.

84

Data:708bf786-f060-4a7d-a42b-8d642ef16f42 | Open Energy Information  

Open Energy Info (EERE)

bf786-f060-4a7d-a42b-8d642ef16f42 bf786-f060-4a7d-a42b-8d642ef16f42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: 2012/05/23 End date if known: Rate name: OUTDOOR LIGHTING SCHEDULE-250 W Sodium (Recent) Sector: Lighting Description: AVAILABILITY AND APPLICABILITY: This schedule is available throughout the Cooperative's entire service area subject to the established Rules and Regulations of the Cooperative, and subject to a location where the lighting fixture and pole(s) can be installed. Outdoor lighting service is available only where there is reasonable assurance that the lighting service to be furnished will be on a permanent, continuous 12-month basis. The Cooperative reserves the right to refuse lighting service under this schedule where the installation, in the Cooperative's opinion, will not be permanent. Where the premises are occupied by a tenant, the Cooperative reserves the right to require the application for service to be made by the property owner. Billing will be sent the tenant however, the property owner shall be ultimately responsible for the payment of the bills. CHARACTER AND TYPE OF SERVICE: The Cooperative will install, own, operate and maintain at its expense the lighting fixture and related appurtenances. The lighting fixture shall be photoelectric or otherwise controlled so as to provide substantially dusk to dawn year around lighting service. Lighting fixtures will be installed only on the Cooperative's poles. All material used to install outdoor lighting shall remain the property of the Cooperative.

85

Data:D0b4b8ae-a98a-4c8b-8b5b-27be8eb20c72 | Open Energy Information  

Open Energy Info (EERE)

ae-a98a-4c8b-8b5b-27be8eb20c72 ae-a98a-4c8b-8b5b-27be8eb20c72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - 24h HPS 150w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

86

Data:460346dc-925b-43bd-a208-b8dcd7650dd8 | Open Energy Information  

Open Energy Info (EERE)

925b-43bd-a208-b8dcd7650dd8 925b-43bd-a208-b8dcd7650dd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

87

Data:85b6499b-8bcb-4921-99e5-4376f2226774 | Open Energy Information  

Open Energy Info (EERE)

b-8bcb-4921-99e5-4376f2226774 b-8bcb-4921-99e5-4376f2226774 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 500kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

88

Data:F0011726-f8b8-4496-98ed-721763d221a8 | Open Energy Information  

Open Energy Info (EERE)

26-f8b8-4496-98ed-721763d221a8 26-f8b8-4496-98ed-721763d221a8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Chattanooga, Tennessee (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: MSC- Very large Manufacturers Sector: Industrial Description: This rate shall apply to the firm electric power requirements where (a) a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 15,000 kW but not more than 25,000 kW, and (b) the major use of electricity is for activities conducted at the delivery point serving that customer which are classified with a 2-digit Standard Industrial Classification Code between 20 and 39

89

Data:9405338d-76b8-43d5-a99f-6386dc173069 | Open Energy Information  

Open Energy Info (EERE)

76b8-43d5-a99f-6386dc173069 76b8-43d5-a99f-6386dc173069 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 250 watt HPS - Cone Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

90

Data:Fa6165cb-1834-419b-8ca6-cea35bec0bdb | Open Energy Information  

Open Energy Info (EERE)

Fa6165cb-1834-419b-8ca6-cea35bec0bdb Fa6165cb-1834-419b-8ca6-cea35bec0bdb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2009/09/30 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

91

Data:27734b8d-55cb-4dfb-9443-34945306c087 | Open Energy Information  

Open Energy Info (EERE)

34b8d-55cb-4dfb-9443-34945306c087 34b8d-55cb-4dfb-9443-34945306c087 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

92

Data:8589990e-461c-478b-9f19-620b8bac5dbd | Open Energy Information  

Open Energy Info (EERE)

9990e-461c-478b-9f19-620b8bac5dbd 9990e-461c-478b-9f19-620b8bac5dbd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Lansdale, Pennsylvania (Utility Company) Effective date: 2013/01/16 End date if known: Rate name: Residential Sector: Residential Description: This rate is subject to a Purchase Power Cost Adjustment. Source or reference: http://www.lansdale.org/vertical/Sites/%7B862B0D24-07B5-47AF-8DA9-6A7934A26ACB%7D/uploads/Motion_F_Res._13-02_revise_electric_rates_fees_etc._1.16.13.pdf Source Parent: http://www.landsdale.org Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

93

Data:4d061bd8-934c-4931-b8ec-5d3653215168 | Open Energy Information  

Open Energy Info (EERE)

bd8-934c-4931-b8ec-5d3653215168 bd8-934c-4931-b8ec-5d3653215168 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 600kW Demand 8am-10pm Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

94

b8.pdf  

U.S. Energy Information Administration (EIA) Indexed Site

4,657 4,657 419 499 763 665 774 846 690 Building Floorspace (Square Feet) 1,001 to 5,000 .............................................. 2,348 227 270 359 321 367 413 390 5,001 to 10,000 ............................................ 1,110 107 102 240 166 193 156 145 10,001 to 25,000 .......................................... 708 63 90 97 84 130 179 65 25,001 to 50,000 .......................................... 257 13 20 39 53 44 43 44 50,001 to 100,000 ........................................ 145 7 9 19 24 26 33 27 100,001 to 200,000 ...................................... 59 Q 5 5 12 8 15 12 200,001 to 500,000 ...................................... 23 Q 2 3 4 4 4 4 Over 500,000 ............................................... 7 Q 1 1 1 2 2 1 Principal Building Activity Education .................................................... 327

95

b8.xls  

U.S. Energy Information Administration (EIA) Indexed Site

4,645 4,645 330 527 562 579 731 707 876 334 Building Floorspace (Square Feet) 1,001 to 5,000 ................................... 2,552 174 315 331 298 350 438 481 165 5,001 to 10,000 ................................. 889 71 107 90 120 180 98 158 66 10,001 to 25,000 ............................... 738 55 64 90 95 122 103 151 58 25,001 to 50,000 ............................... 241 19 23 26 33 48 32 39 21 50,001 to 100,000 ............................. 129 7 9 14 22 16 20 28 13 100,001 to 200,000 ........................... 65 Q 5 8 8 10 10 15 8 200,001 to 500,000 ........................... 25 Q 4 2 3 4 4 4 2 Over 500,000 .................................... 7 Q 1 1 0 1 2 1 Q Principal Building Activity Education .......................................... 386 12 26 78 60 58 44 75 32 Food Sales ....................................... 226 Q Q Q Q Q 33 56 Q Food Service .....................................

96

Appendix B-8  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery and Reinvestment Act-Reporting Requirements (JUL 2010) FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items...

97

Data:297290c2-98b8-405b-9638-1584a5174612 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:297290c2-98b8-405b-9638-1584a5174612 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Licking Rural Electric Inc Effective date: End date if known: Rate name: Residential Sector: Residential Description: Available in all territory served by the Cooperative in accordance with the Cooperative's Service Rules and Regulations. APPLICABILITY Applicable to Small Commercial and General Service consumers requiring 50 kVA or less transformer capacity. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower, without the consent of the Cooperative. TYPE OF SERVICE Single-phase, 60 hertz, at available secondary voltages.

98

Pages that link to "Data:9f7c1731-b569-452d-83da-cc6b4736d5b8...  

Open Energy Info (EERE)

-452d-83da-cc6b4736d5b8: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Oak Ridge, Tennessee (Utility Company) ( links) View (previous 50 | next 50) (20 |...

99

Pages that link to "Data:72677b62-a1d3-449b-8b22-1a263e1c55f6...  

Open Energy Info (EERE)

-449b-8b22-1a263e1c55f6: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Oak Ridge, Tennessee (Utility Company) ( links) View (previous 50 | next 50) (20 |...

100

Data:4158f638-5823-497f-80b8-ce98e01cc236 | Open Energy Information  

Open Energy Info (EERE)

f638-5823-497f-80b8-ce98e01cc236 f638-5823-497f-80b8-ce98e01cc236 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indianapolis Power & Light Co Effective date: 2011/03/15 End date if known: Rate name: MU-1 - a1c - 100 watt HPS - Washington Post Std. Sector: Lighting Description: Lamps in enclosed post top type fixtures, mounted on metal or fiberglass ornamental columns and supplied from underground circuits. APPLICABILITY: For Street and Traffic Lighting of public streets, parkways, improved alleys, boulevards, drives, bridges, parking areas, or other public places by Cities or Towns or by individuals, groups of individuals, associations and other than incorporated municipalities; and lighting of public parks, drives, bridges, parking areas or other public places by only Cities or Towns where there is a prospect that the capital expenditure is warranted. The capital expenditure will be warranted if the amount of revenue received in sixty (60) months exceeds the estimated cost of installation for the lights as calculated by the Company. If the 60-month revenue does not exceed the cost of installation, the Customer must pay two and one-half (2½) times the difference of the cost of installation and the 60-month revenue prior to installation of the lighting. The terms, prices and provisions of this rate schedule shall be applicable to a consolidated city of the first class only to the extent not inconsistent with the specifications, terms, prices and provisions in contracts which may be entered into by such city pursuant to I.C. § 36-9-9-1, et. seq.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:5c7555b8-8705-4153-8928-dc86f7644eb5 | Open Energy Information  

Open Energy Info (EERE)

55b8-8705-4153-8928-dc86f7644eb5 55b8-8705-4153-8928-dc86f7644eb5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option B 230000+ volts Sector: Description: Transmission Service Discount for service taken at 230000+ volts when the customer provides all the equipment required to take service at JEA's existing transmission lines. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

102

Data:7e261436-d917-4062-a13c-b8c07a21fd8e | Open Energy Information  

Open Energy Info (EERE)

1436-d917-4062-a13c-b8c07a21fd8e 1436-d917-4062-a13c-b8c07a21fd8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Haywood Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: RGS General Renewable Generation Service 56G (>50<75 kW w/o trans) - 5 Year Fixed Sector: Description: AVAILABILITY Available only to members located in the Cooperative's service territory who have Renewable Generation interconnected directly with the Cooperative's system with a capacity of 75 kW or less and contract with the Cooperative to sell all generated capacity and energy to the Cooperative. Renewable Generation, or Renewable Energy Resource, shall be as defined as adopted by NC G.S. 62-133.8(a)(8). Service necessary for the delivery of the member's power into the Cooperative's system under this schedule shall be furnished solely to the individual contracting member in a single enterprise, located entirely on a single, contiguous premise. Service hereunder shall be restricted to the capacity of the member's generating facilities which may be operated in parallel with the Cooperative's system. Service necessary to supply the member's Auxiliary Load when the member's generating facilities are not operating, shall be billed under the Energy Charges in this schedule, increased or decreased in accordance with the Wholesale Power Cost Adjustment Rider. Power delivered to the Cooperative under this schedule shall not offset or be substituted for power contracted for or which may be contracted for under any other schedule of the Cooperative. The obligations of the Cooperative in regard to service under this Rider are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises, and permits for such service. The Cooperative shall not be liable to any member or applicant for power in the event it is delayed in, or is prevented from purchasing power by its failure to secure and retain such rights-of-way, rights, privileges, franchises, and permits. The Cooperative also reserves the right to review and determine on a case by case basis whether it has the need and system capacity to absorb the amount of proposed generation on the Cooperatives distribution system due to size and/or location.

103

Data:49ec3914-24ef-40da-8239-0b1b8ee6c610 | Open Energy Information  

Open Energy Info (EERE)

ec3914-24ef-40da-8239-0b1b8ee6c610 ec3914-24ef-40da-8239-0b1b8ee6c610 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co Effective date: 2012/03/01 End date if known: Rate name: Schedule 4 - Energy Watch Pilot Plan Sector: Residential Description: * Optional plan - Currently Suspended Critical peak period for Energy Watch Event (10 select summer days): 5:00 p.m. to 9:00 p.m. Energy Watch Event hours: 39.9078¢ AVAILABILITY Service under this schedule is available at points on the Company's interconnected system to residential Customers in the Emmett Valley where existing facilities of adequate capacity and desired phase and voltage are adjacent to the Premises to be served, additional investment by the Company for new transmission, substation or terminal facilities is not necessary to supply the desired service, and Advanced Meter Reading (AMR) equipment is installed. For the purposes of this schedule, the Emmett Valley is considered to be the area within the vicinity of the cities of Emmett and Letha, Idaho. The Residential Service Energy Watch Pilot Plan is an optional, voluntary service that provides residential Customers the option to take electric service with a critical peak pricing component. If a Customer requests to participate in this Pilot, the Customer will be placed on the rate schedule at the next regularly scheduled meter reading provided the Company has received two weeks notice from the Customer prior to the next regularly scheduled meter read date, subject to work schedule constraints. A Customer may terminate their participation on this rate schedule at any time. However, the Customer may not subsequently elect service under this rate schedule for one year after the effective date of cancellation.

104

Data:2ed15d96-cf26-46c0-ae39-05e4231b8e1a | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:2ed15d96-cf26-46c0-ae39-05e4231b8e1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arizona Public Service Co Effective date: 2012/07/01 End date if known: Rate name: LARGE GENERAL SERVICE (401 kW +) TIME OF USE RATE SCHEDULE E-32TOU L - Instrument-Rated Meters Sector: Industrial Description: This rate schedule is applicable to all Standard Offer and Direct Access customers whose Average Monthly Maximum Demand is greater than 400kW per month. The Company will place the Customer on the applicable Rate Schedule E-32 TOU XS, E-32TOUS, E-32 TOU M, or E-32 TOU L based on the Average Monthly Maximum Demand, as determined by the Company each year.

105

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

106

Data:1fa28776-b008-449b-8dd7-8491526fee38 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:1fa28776-b008-449b-8dd7-8491526fee38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 1 - RESIDENTIAL SERVICE NSS (Non-Retail) Sector: Residential Description: APPLICABLE TO THE USE OF SERVICE FOR: Residential Customers in individual private dwellings, flats or apartments, and Religious Customers utilizing service exclusively in connection with religious purposes by a corporation or association organized and conducted in good faith for religious purposes. Applicable also to use exclusively in connection with a community residence for the mentally disabled, as defined in subdivision 28, 28-a, or 28-b of section 1.03 of the mental hygiene law, provided that such residence is operated by a not-for-profit corporation and, if supervisory staff is on site 24 hours a day, that the residence provides living accommodations for 14 or fewer residents. Also applicable to any not-for-profit corporation that is a veterans' organization that owns or leases a post or hall. Flat rate Adjustments = Transition Charge+MFC

107

Data:81c3c537-65ea-4e6f-8fbb-3dbff9dd3b8d | Open Energy Information  

Open Energy Info (EERE)

c537-65ea-4e6f-8fbb-3dbff9dd3b8d c537-65ea-4e6f-8fbb-3dbff9dd3b8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Commercial and General Service - Heat Pump Sector: Commercial Description: TO WHOM AVAILABLE Available to Commercial and General Service customer who are certified by the Company to meet or exceed the Energy Efficient Standards, who have suitable metering equipment, subject to the conditions set forth in this schedule and the accompanying Rules and Regulations of this tariff. The customer must have a Company accepted heat pump or other electric energy efficient heating/cooling device as of the date of the final Order in Cause No. 43969 and operate that device as the primary heating/cooling source for the structure. The device must be permanently installed and the customer shall utilize the device and/or associated appliance for both heating and cooling the same space. The customer must arrange the wiring for the permanently installed heating/cooling equipment to permit measurement of the energy use of such heating and cooling equipment by suitable metering equipment as specified by the Company. Service for heating and cooling shall be billed as follows: (1) Energy used by such heating and cooling equipment during any period more than half of which is in any month of May to September, inclusive, shall be deemed to be supplied for spacecooling and will be billed under the applicable electric Rate Schedule; and (2) Energy used by such heating and cooling equipment during other periods of the year shall be deemed to be supplied for spaceheating and will be billed under this schedule. For customers converting existing heating/cooling systems to heating/cooling systems which qualify under this rate schedule, who cannot, in the opinion of the Company, economically justify separately metering the heating/cooling equipment, a base usage shall be established which will consist of the average of the kilowatt hours and the kilowatt demand billed during the billing months of May and October of the current year. Any energy and/or demand used in excess of the base usage during any billing period more than half of which is within any calendar month from October to April, inclusive, shall be deemed to be supplied for spaceheating and will be billed under this rate schedule. All other use will be billed under the applicable rate schedule. The base usage(s) will be updated annually prior to the start of the heating season. CHARACTER OF SERVICE The Company will supply service at such frequency, phase, regulation and voltage as it has available at the location where service is required. Service under this rate schedule shall be available only at the same voltage as other electric service supplied the premises. Any applicant requiring service differing from that to be supplied by the Company as herein provided shall provide proper converting, transforming, regulating or other equipment upon his own premises and at his own expense. (See Company Rule 3 or the Company's standard voltages.)

108

Data:F835c0b8-ea73-4af6-93e4-59d068a73a4a | Open Energy Information  

Open Energy Info (EERE)

5c0b8-ea73-4af6-93e4-59d068a73a4a 5c0b8-ea73-4af6-93e4-59d068a73a4a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: 21 Sector: Commercial Description: AVAILABLE: To Customers in the State of Washington where Company has electric service available. APPLICABLE: To general service supplied for all power requirements when all such service taken on the premises is supplied through one meter installation. Customer shall provide and maintain all transformers and other necessary equipment on their side of the point of delivery and enter into a written contract for five (5) years or longer.

109

Electrochemical construction  

DOE Patents (OSTI)

An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

Einstein, Harry (Springfield, NJ); Grimes, Patrick G. (Westfield, NJ)

1983-08-23T23:59:59.000Z

110

Data:48054070-5ab7-4345-9e7c-c2bd706833b8 | Open Energy Information  

Open Energy Info (EERE)

54070-5ab7-4345-9e7c-c2bd706833b8 54070-5ab7-4345-9e7c-c2bd706833b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: High-Pressure Sodium- 400 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost. Source or reference: http://www.bangorhydro.com/residential/rates/rates-schedules.aspx

111

Data:2e62822a-3861-43b8-8046-52cb7f8f8fae | Open Energy Information  

Open Energy Info (EERE)

2a-3861-43b8-8046-52cb7f8f8fae 2a-3861-43b8-8046-52cb7f8f8fae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/15 End date if known: Rate name: Highway Lighting HPS 100 Watt (Nonwood/Open Refractor) Sector: Lighting Description: Available to public authorities, other than municipalities, for public high way and roadway lighting in the retail distribution service territory of the District. Source or reference: www.nppd.com/my-account/rates-2/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

112

Data:A5f22d58-c907-4b8c-aebd-f42f8e56363f | Open Energy Information  

Open Energy Info (EERE)

8-c907-4b8c-aebd-f42f8e56363f 8-c907-4b8c-aebd-f42f8e56363f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/01/01 End date if known: Rate name: 2 GS-DG General Service Distributed Generation Sector: Description: Available to residential Consumers, or to other Consumers requiring single phase, 25 kVA or less of transformer capacity, subject to Association's established rules and regulations. This rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others.

113

Data:5533c944-4e5f-4f57-adce-31b8c08ffefd | Open Energy Information  

Open Energy Info (EERE)

44-4e5f-4f57-adce-31b8c08ffefd 44-4e5f-4f57-adce-31b8c08ffefd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Shoe Box 100 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

114

Data:B56f72b4-866a-476d-9106-c066bf2eb5b8 | Open Energy Information  

Open Energy Info (EERE)

b4-866a-476d-9106-c066bf2eb5b8 b4-866a-476d-9106-c066bf2eb5b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lincolnton, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: New Large Load Commercial Sector: Commercial Description: Must equal or exceed 500 kW but be less than 3000 kW during at least three months of a twelve-month period. Applies only to new customers after January 1, 2010 Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/211/Lincolnton%20NC.pdf Source Parent:

115

Data:75908ffc-c1b8-453b-9837-eb128e440d62 | Open Energy Information  

Open Energy Info (EERE)

ffc-c1b8-453b-9837-eb128e440d62 ffc-c1b8-453b-9837-eb128e440d62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: SECURITY LIGHTING(150 Watt HPS(Nema)) Sector: Lighting Description: At all locations whenever the service can be provided with overhead wiring on an existing RPU owned pole. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

116

Data:8ac9ddbc-cd04-4f5b-9557-f4822a96b8db | Open Energy Information  

Open Energy Info (EERE)

ac9ddbc-cd04-4f5b-9557-f4822a96b8db ac9ddbc-cd04-4f5b-9557-f4822a96b8db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russell, Massachusetts (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: RESIDENTIAL SERVICE SCHEDULE R1- FARM DISCOUNT Sector: Residential Description: Additional Info: Availability: To residential customers for all domestic uses in individual residences or apartments. It includes 10% farm discount. Minimum Bill: $4.50. Flat rate buy = Distribution + Transmission + Generation. Flat rate Adjustment = TAC + ECS + PPA. Source or reference: http://www.townofrussell.us/ElectricRates.html

117

Data:44436bf9-900c-41b8-b619-d8f59cbbdac9 | Open Energy Information  

Open Energy Info (EERE)

bf9-900c-41b8-b619-d8f59cbbdac9 bf9-900c-41b8-b619-d8f59cbbdac9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Nebraska (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: High Tension Service Sector: Industrial Description: The High Tension rate shall be based upon a cost-plus calculation obtained from real-time metering. The rate shall include the actual cost of wholesale electricity purchased plus a percentage added to cover the required electric utility margin. The High Tension rate will be calculated, charged, and managed by the City Manager.

118

Data:20e41de3-c072-47b8-8808-7c4162dd7cc0 | Open Energy Information  

Open Energy Info (EERE)

de3-c072-47b8-8808-7c4162dd7cc0 de3-c072-47b8-8808-7c4162dd7cc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oklahoma Electric Coop Inc Effective date: 2012/01/01 End date if known: Rate name: Commercial Time-of-Peak Secondary Service Sector: Commercial Description: To members located on or near Cooperative's distribution lines for commercial and industrial usage, subject to the established Terms and Conditions of the Cooperative. This schedule is not applicable to breakdown, standby, supplementary or resale service. Source or reference: http://www.okcoop.org/services/rates.aspx Source Parent:

119

Data:C782dbaf-0f94-440b-8bbd-eba1798025a9 | Open Energy Information  

Open Energy Info (EERE)

dbaf-0f94-440b-8bbd-eba1798025a9 dbaf-0f94-440b-8bbd-eba1798025a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: End date if known: Rate name: RATE 6 INTERRUPTIBLE SERVICE OVER 50 KW DEMAND Sector: Commercial Description: Applicable to commercial and industrial consumers for all uses including lighting, heating and power, subject to the established rules and regulations of the cooperative. Approval of the cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes. Source or reference: http://www.cornbeltenergy.com/images/pdfs/700-06%20central%20rate%206%20effective%2004-07.pdf

120

Data:391e1fe8-d264-4e35-9319-20b8d7a3ab82 | Open Energy Information  

Open Energy Info (EERE)

fe8-d264-4e35-9319-20b8d7a3ab82 fe8-d264-4e35-9319-20b8d7a3ab82 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Large Commercial (K23P) Sector: Commercial Description: Large commercial primary voltage rate for large commercial and industrial customers with monthly demand usage exceeding 50 KWD. Source or reference: http://publicutilities.columbus.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=45273 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:26624b33-6dec-428e-b74d-b8fc927de9bf | Open Energy Information  

Open Energy Info (EERE)

dec-428e-b74d-b8fc927de9bf dec-428e-b74d-b8fc927de9bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Private Outdoor Lighting- (150 W HPS) Sector: Lighting Description: When mercury vapor area light fixture is mounted on an existing wood distribution pole where secondary voltage exists Source or reference: http://www.ci.independence.mo.us/PL/Rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

122

Data:B5a349af-ccd1-4308-b8b3-613c9717c1d6 | Open Energy Information  

Open Energy Info (EERE)

9af-ccd1-4308-b8b3-613c9717c1d6 9af-ccd1-4308-b8b3-613c9717c1d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: Rate L Substation Rate Sector: Industrial Description: Available to commercial or industrial customers with demands exceeding 100 kW. A discount of 5% is applied to demand and energy charges for substation customers as defined as service taken directly from the low side bus of the distribution substation or where the customer requests multiple points of delivery. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates

123

Data:56a0b8b5-d3f1-4281-8b9c-150b169af7d7 | Open Energy Information  

Open Energy Info (EERE)

b8b5-d3f1-4281-8b9c-150b169af7d7 b8b5-d3f1-4281-8b9c-150b169af7d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/12/19 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-High Pressure Sodium 250W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements.

124

Data:6dec741d-5050-4fe1-b617-9025f86e17b8 | Open Energy Information  

Open Energy Info (EERE)

dec741d-5050-4fe1-b617-9025f86e17b8 dec741d-5050-4fe1-b617-9025f86e17b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lompoc, California (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Customer Owned Street and Highway Lighting- (100W HPS) Sector: Lighting Description: This schedule applies to Customer-owned and maintained lighting installations which illuminate private streets and highways. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

125

Data:Eb274cfe-7e82-418b-8f74-b02c41714676 | Open Energy Information  

Open Energy Info (EERE)

74cfe-7e82-418b-8f74-b02c41714676 74cfe-7e82-418b-8f74-b02c41714676 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2009/06/01 End date if known: Rate name: High voltage service HV-23 Sector: Industrial Description: This schedule, subject to limitations hereinafter set forth, is applicable to the alternating current electrical requirements of any customer at one location adjacent to the company's overhead transmission system. Source or reference: http://www.entergy-neworleans.com/content/price/tariffs/enoi_elec_hv.pdf Source Parent: Comments Applicability

126

Data:6ff666ff-7b31-4f6b-8c62-faddf350c6dd | Open Energy Information  

Open Energy Info (EERE)

ff-7b31-4f6b-8c62-faddf350c6dd ff-7b31-4f6b-8c62-faddf350c6dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (250 MH Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

127

Data:19c7b9ce-07b8-4188-ad97-51ba2cb519f7 | Open Energy Information  

Open Energy Info (EERE)

b9ce-07b8-4188-ad97-51ba2cb519f7 b9ce-07b8-4188-ad97-51ba2cb519f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: TDGSA Sector: Industrial Description: Source or reference: ISU Binder Source Parent: Comments flat & fuel adjustment charges vary month to month Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

128

Data:62f2349f-9d95-4a73-a47b-8efe6555aea3 | Open Energy Information  

Open Energy Info (EERE)

9d95-4a73-a47b-8efe6555aea3 9d95-4a73-a47b-8efe6555aea3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Metal Halide 250 watts - Enclosed Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

129

Data:C98a8769-a7d6-4b8e-ba70-b367bb78df54 | Open Energy Information  

Open Energy Info (EERE)

69-a7d6-4b8e-ba70-b367bb78df54 69-a7d6-4b8e-ba70-b367bb78df54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Thief River Falls, Minnesota (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Security Lights 250 MV Sector: Lighting Description: uses Mercury Vapor Source or reference: http://www.citytrf.net/ratesheet.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

130

Data:D53c23b8-0552-47ea-9cc2-33159d342b4b | Open Energy Information  

Open Energy Info (EERE)

b8-0552-47ea-9cc2-33159d342b4b b8-0552-47ea-9cc2-33159d342b4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Seasonal/Cabin- CYC1 - Single Phase Sector: Residential Description: Demand charge blocked and annual. Source or reference: Illinois State University #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

131

Data:F1a2a546-ab41-4590-b8be-fd82c889a04e | Open Energy Information  

Open Energy Info (EERE)

46-ab41-4590-b8be-fd82c889a04e 46-ab41-4590-b8be-fd82c889a04e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Large Wind Farm Service V2 Sector: Industrial Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

132

Data:0ff7b97b-44b8-4934-ad00-06acc47d52b6 | Open Energy Information  

Open Energy Info (EERE)

b97b-44b8-4934-ad00-06acc47d52b6 b97b-44b8-4934-ad00-06acc47d52b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Nonlisted Light - 325 Watts Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

133

Data:7e3a9c79-2ba1-48b8-b364-288004cee995 | Open Energy Information  

Open Energy Info (EERE)

c79-2ba1-48b8-b364-288004cee995 c79-2ba1-48b8-b364-288004cee995 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large General Service Demand Sector: Commercial Description: Applicable to non-residential uses where the highest annual metered demand is greater than 500 kilowatts. Subject to Power cost recovery. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

134

Data:0f2924b8-dfb5-42bf-8399-c59ced7aa2b4 | Open Energy Information  

Open Energy Info (EERE)

24b8-dfb5-42bf-8399-c59ced7aa2b4 24b8-dfb5-42bf-8399-c59ced7aa2b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dowagiac, Michigan (Utility Company) Effective date: End date if known: Rate name: RESIDENTIAL ELECTRIC SERVICE Sector: Residential Description: Available to customers desiring service for all usual domestic purposes through one meter to a single occupancy or individual dwelling unit. This rate is not available for commercial or industrial use. Source or reference: http://www.cityofdowagiac.com/Administration/PDF/departments/Electric%20Rates%2011-23-10.pdf Source Parent:

135

Data:4147f11a-12ae-4c2b-8dc4-49119afe8eff | Open Energy Information  

Open Energy Info (EERE)

1a-12ae-4c2b-8dc4-49119afe8eff 1a-12ae-4c2b-8dc4-49119afe8eff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Lewis County Effective date: End date if known: Rate name: PRIMARY POWER SERVICE Schedule 31-I Sector: Industrial Description: Source or reference: http://www.lcpud.org/schedule31.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

136

Data:B968c8b8-25da-444e-82e4-b863c611ecba | Open Energy Information  

Open Energy Info (EERE)

8c8b8-25da-444e-82e4-b863c611ecba 8c8b8-25da-444e-82e4-b863c611ecba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Lamp and Fixture on Pole - 175 Watt MV Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

137

Data:5b9d00ff-75b8-49f3-9fab-15c95f225768 | Open Energy Information  

Open Energy Info (EERE)

d00ff-75b8-49f3-9fab-15c95f225768 d00ff-75b8-49f3-9fab-15c95f225768 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp (Idaho) Effective date: 2012/10/01 End date if known: Rate name: GS - Schedule 11 Sector: Commercial Description: AILABLE: To Customers in the State of Idaho where Company has electric service available. APPLICABLE: To general service supplied for all power requirements when all such service taken on the premises is supplied through one meter installation. Source or reference: http://www.puc.state.id.us/tariff/approved/Electric/AvistaElectric.pdf Source Parent: Comments

138

Data:D38eee9d-f3ae-413b-8926-91cf50b8b20b | Open Energy Information  

Open Energy Info (EERE)

d-f3ae-413b-8926-91cf50b8b20b d-f3ae-413b-8926-91cf50b8b20b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Landis, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Residential All Electric Senior Citizens Service Sector: Residential Description: A tax of $.003379 is included in this rate Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

139

Data:E3fe84b8-0323-43b6-85d2-baf930eb2efc | Open Energy Information  

Open Energy Info (EERE)

fe84b8-0323-43b6-85d2-baf930eb2efc fe84b8-0323-43b6-85d2-baf930eb2efc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Large time of use over 1,000kw Primary Sector: Commercial Description: * Minimum :Higher of the following; Distribution kw charge plus customer charge plus facility charge plus purchased power cost. $ 5000 plus purchased power cost. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

140

Data:Df653107-895f-4768-982e-31abb4c0b8e4 | Open Energy Information  

Open Energy Info (EERE)

7-895f-4768-982e-31abb4c0b8e4 7-895f-4768-982e-31abb4c0b8e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: OPTIONAL RENEWABLE ENERGY RIDER FOR Commercial and Industrial Sector: Residential Description: Available to any member of the Corporation with less than 25 kW monthly demand taking service concurrently under Schedule SP Single Phase Electric Service. The Corporation reserves the right to limit the total number of participants under this Rider. In addition to the total charges determined under Rate Schedule SP applicable to the consumer, the following charge shall apply:

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:49973520-f297-406a-94cd-26b8fab0b5e1 | Open Energy Information  

Open Energy Info (EERE)

0-f297-406a-94cd-26b8fab0b5e1 0-f297-406a-94cd-26b8fab0b5e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- Unmetered- 100W High Pressure Sodium Sector: Lighting Description: Applicable to street and highway lighting where customer owns and maintains street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

142

Data:Cb3a0ca9-e7ae-4ba8-bc4d-0b8d245529a1 | Open Energy Information  

Open Energy Info (EERE)

ca9-e7ae-4ba8-bc4d-0b8d245529a1 ca9-e7ae-4ba8-bc4d-0b8d245529a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brodhead Water & Lighting Comm Effective date: 2010/02/15 End date if known: Rate name: Industrial Power Time of day CP-3 above 1,000kW Demand Sector: Industrial Description: *POWER COST ADJUSTMENT CLAUSE (PCAC): All metered rates are subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt - hour of sales) is greater or lesser than the base cost of power purchased and produced (per kilowatt - hour of sales).

143

Data:24400833-5ab8-4189-98b8-d3f742c7f2ce | Open Energy Information  

Open Energy Info (EERE)

5ab8-4189-98b8-d3f742c7f2ce 5ab8-4189-98b8-d3f742c7f2ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Metered Memb Repairs HPS 250 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

144

Data:1b367429-c344-4859-b8bd-4dc6c9dbbe37 | Open Energy Information  

Open Energy Info (EERE)

9-c344-4859-b8bd-4dc6c9dbbe37 9-c344-4859-b8bd-4dc6c9dbbe37 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 250 W MV Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

145

Data:C6cc60b8-c6f5-467c-82bc-be54db91f9fa | Open Energy Information  

Open Energy Info (EERE)

0b8-c6f5-467c-82bc-be54db91f9fa 0b8-c6f5-467c-82bc-be54db91f9fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Large Power Rate Sector: Industrial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

146

Data:9e2880f6-fd8a-448b-8a79-9b9439242808 | Open Energy Information  

Open Energy Info (EERE)

-fd8a-448b-8a79-9b9439242808 -fd8a-448b-8a79-9b9439242808 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Hamilton, New York (Utility Company) Effective date: End date if known: Rate name: LGC Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

147

Data:24e99bfe-83b8-4aca-8e49-c4376c4f4389 | Open Energy Information  

Open Energy Info (EERE)

3b8-4aca-8e49-c4376c4f4389 3b8-4aca-8e49-c4376c4f4389 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Light Service - DHPS 200 W Wood Pole Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

148

Data:D4b211c5-938e-45ab-a5b8-edc53ed137e1 | Open Energy Information  

Open Energy Info (EERE)

c5-938e-45ab-a5b8-edc53ed137e1 c5-938e-45ab-a5b8-edc53ed137e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bon Homme Yankton El Assn, Inc Effective date: 2012/05/01 End date if known: Rate name: Irrigation, Three-Phase Controlled Sector: Industrial Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

149

Data:E4cf1b93-fc94-4c31-bdb8-bae075e874b8 | Open Energy Information  

Open Energy Info (EERE)

b93-fc94-4c31-bdb8-bae075e874b8 b93-fc94-4c31-bdb8-bae075e874b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: 2012/09/01 End date if known: Rate name: 175 Watt MVL 75 kWh Street Light Sector: Lighting Description: Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/street_lights_2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

150

Data:1c89c358-6bd0-40b8-b974-8b95df369549 | Open Energy Information  

Open Energy Info (EERE)

bd0-40b8-b974-8b95df369549 bd0-40b8-b974-8b95df369549 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule SL (Security Lighting) (Standard Fixtures 175 Watt MV) Sector: Lighting Description: Available to all cooperative members. Standard fixtures 175 watt MV Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

151

Data:0c753bf9-eb33-45ba-9180-36d493b8be56 | Open Energy Information  

Open Energy Info (EERE)

3bf9-eb33-45ba-9180-36d493b8be56 3bf9-eb33-45ba-9180-36d493b8be56 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of High Point, North Carolina (Utility Company) Effective date: 2012/07/06 End date if known: Rate name: General Service with Water Heating Sector: Commercial Description: This rate is available only to customers receiving service at 575 volts or less on Rate 10 or Rate 21, provided that water heaters are of the insulated storage type, and that energy used is limited to the heating of water for purposes other than space heating. Source or reference: http://www.highpointnc.gov/custsrv/Commercial.pdf

152

Data:4b05c169-f490-431e-b8ad-cfac4c95354a | Open Energy Information  

Open Energy Info (EERE)

c169-f490-431e-b8ad-cfac4c95354a c169-f490-431e-b8ad-cfac4c95354a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Underground MV Traditional 175 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

153

Data:69d0b82c-6f7b-479c-be5f-69b8ae37de3b | Open Energy Information  

Open Energy Info (EERE)

c-6f7b-479c-be5f-69b8ae37de3b c-6f7b-479c-be5f-69b8ae37de3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation CYC 1 - Sunday Only - Three Phase Sector: Industrial Description: Source or reference: Illinois State University binder #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

154

Data:1bbd8a76-23b0-4c7b-8aa1-7591808ba570 | Open Energy Information  

Open Energy Info (EERE)

bbd8a76-23b0-4c7b-8aa1-7591808ba570 bbd8a76-23b0-4c7b-8aa1-7591808ba570 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Greenfield, Indiana (Utility Company) Effective date: End date if known: Rate name: GENERAL SERVICE (GS), Single-Phase Sector: Commercial Description: If the electric utility places its meters at the primary voltage level, the consumer's demand (kW) and energy (kWh) measurements shall be reduced by 2% for the purposes of this schedule. Source or reference: http://www.greenfieldin.org/utility-billing Source Parent: http://www.greenfieldin.org/utilities/utility-billing-department

155

Data:E43c36b8-16e1-4369-aaee-7578d3e90ea5 | Open Energy Information  

Open Energy Info (EERE)

6b8-16e1-4369-aaee-7578d3e90ea5 6b8-16e1-4369-aaee-7578d3e90ea5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: Pole Attachment Sector: Commercial Description: To other utilities and certain entities which may occupy public right-of-way and who attach communication cables and other communication appliances on System poles where such attachments are made in accordance with National Electrical Safety Code (NESC) and local laws and are in compliance with the provisions of an applicable Pole Attachment Contract, if any.

156

Data:4ad218f4-09d6-44d7-b8b9-1530129c3528 | Open Energy Information  

Open Energy Info (EERE)

8f4-09d6-44d7-b8b9-1530129c3528 8f4-09d6-44d7-b8b9-1530129c3528 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2011/10/01 End date if known: Rate name: Schedule 81 - South System General Power Time-of-Use Rate Sector: Commercial Description: This rate shall apply to the firm power requirements for electric service to commercial, industrial, and governmental customers, and institutional customers whose monthly read demand is greater than 0 and less than or equal to 50 KW. Source or reference: ISU Documentation Source Parent: Comments Applicability

157

Data:065a317e-db1e-462a-924b-8fa43acd86cc | Open Energy Information  

Open Energy Info (EERE)

db1e-462a-924b-8fa43acd86cc db1e-462a-924b-8fa43acd86cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ozarks Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: LTG-MUN - 175 Watt MVL - Shielded Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

158

Data:D6816a84-74ea-4535-b8f7-711be7a587bc | Open Energy Information  

Open Energy Info (EERE)

-74ea-4535-b8f7-711be7a587bc -74ea-4535-b8f7-711be7a587bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 1 - General Delivery Service 15kV to 100kV Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

159

Data:3c09ed6b-8e60-4fae-8ec0-36f91531c711 | Open Energy Information  

Open Energy Info (EERE)

b-8e60-4fae-8ec0-36f91531c711 b-8e60-4fae-8ec0-36f91531c711 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 400 W HPS Street Lighting, Customer-Owned Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

160

Data:00d0b4e8-2956-42b8-8fd4-4cc8e1804044 | Open Energy Information  

Open Energy Info (EERE)

e8-2956-42b8-8fd4-4cc8e1804044 e8-2956-42b8-8fd4-4cc8e1804044 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (400 FL Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:0ee8816e-6ed0-4aec-9423-7b45b8bb04d4 | Open Energy Information  

Open Energy Info (EERE)

e-6ed0-4aec-9423-7b45b8bb04d4 e-6ed0-4aec-9423-7b45b8bb04d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 140W LED Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

162

Data:B9bc60b8-b27d-4d88-9d5d-729cf4bc9314 | Open Energy Information  

Open Energy Info (EERE)

bc60b8-b27d-4d88-9d5d-729cf4bc9314 bc60b8-b27d-4d88-9d5d-729cf4bc9314 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Troy, Indiana (Utility Company) Effective date: End date if known: Rate name: Schedule B: General Power Sector: Commercial Description: Rate is subject to a Purchased Power Cost Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

163

Data:C7c69028-1068-45b1-bbb0-15545162b8c6 | Open Energy Information  

Open Energy Info (EERE)

8-1068-45b1-bbb0-15545162b8c6 8-1068-45b1-bbb0-15545162b8c6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: LGT10-LU100 Sector: Commercial Description: Sodium: only available at existing locations with existing fixtures Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

164

Data:Fee42ed8-81fe-47cd-bb38-7860b5a4b8a0 | Open Energy Information  

Open Energy Info (EERE)

ed8-81fe-47cd-bb38-7860b5a4b8a0 ed8-81fe-47cd-bb38-7860b5a4b8a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: SL-1 Security Lighting: 100 W HPS Sector: Lighting Description: Available to customers within the utility's service territory for security and/or yard lighting. Commitment to Community Program Rider: Sl-1 Security Lighting 2.0% of the total electric bill Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440 Source Parent: Comments Applicability

165

Data:7d84af2f-c458-4906-941d-80620d01b8bc | Open Energy Information  

Open Energy Info (EERE)

f-c458-4906-941d-80620d01b8bc f-c458-4906-941d-80620d01b8bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

166

Data:01016adc-651e-498c-aa04-a8b8ead3f012 | Open Energy Information  

Open Energy Info (EERE)

adc-651e-498c-aa04-a8b8ead3f012 adc-651e-498c-aa04-a8b8ead3f012 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Off Peak Rate (Under 500KW) Rate B Sector: Industrial Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

167

Data:Dc853967-6279-47fe-b8a2-6874367e10e4 | Open Energy Information  

Open Energy Info (EERE)

7-6279-47fe-b8a2-6874367e10e4 7-6279-47fe-b8a2-6874367e10e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ashland, Oregon (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service- Governmental Large Service Sector: Commercial Description: This schedule is applicable to electric service loads which have registered a peak demand of 1,000-3,000 kilowatts more than once in any consecutive 18-month period. Source or reference: http://ashland.or.us/Files/2011-29_.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

168

Data:326f24e0-1af5-4688-b0b8-78c66bdc6aca | Open Energy Information  

Open Energy Info (EERE)

e0-1af5-4688-b0b8-78c66bdc6aca e0-1af5-4688-b0b8-78c66bdc6aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (1000W SV on existing 45 ft. wood Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

169

Data:Ec9091a8-9820-43fe-9543-09bbe29b8cde | Open Energy Information  

Open Energy Info (EERE)

Ec9091a8-9820-43fe-9543-09bbe29b8cde Ec9091a8-9820-43fe-9543-09bbe29b8cde No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: PUBLIC STREET LIGHTING SERVICE SCHEDULE 40- Metal Halide 400 WATT Sector: Lighting Description: From dusk to dawn daily, controlled by a photoelectric control or time switch to be mutually agreeable to the Customer and District. Source or reference: http://www.cowlitzpud.org/pdf/Rate%20Schedule%2040%20Public%20Street%20Lighting%2010-25-11.pdf Source Parent: Comments Applicability Demand (kW)

170

Data:13eec80c-9064-448a-a05a-21907aec5b8f | Open Energy Information  

Open Energy Info (EERE)

eec80c-9064-448a-a05a-21907aec5b8f eec80c-9064-448a-a05a-21907aec5b8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitewater Valley Rural EMC Effective date: 2011/01/01 End date if known: Rate name: Schedule GS TOU - General Service Time-of-Use Sector: Commercial Description: This rate is subject to Wholesale Power Cost Adjustment. Source or reference: http://www.wwvremc.com/documents/2010_General_Service_TOU.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

171

Data:A72930bf-f950-474e-98a3-626fb72b8e4f | Open Energy Information  

Open Energy Info (EERE)

f950-474e-98a3-626fb72b8e4f f950-474e-98a3-626fb72b8e4f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barnesville, Georgia (Utility Company) Effective date: 2011/11/01 End date if known: Rate name: Security Lighting Service 400 W HPSV Sector: Lighting Description: To unmetered dusk-to-down electric service provided by high pressure by high pressure sodium vapor luminaries supported by short brackets and mounted on either the city's existing wood poles or poles owned by the customer which conform to the city's specifications. Source or reference: Rate Binder # 2 Source Parent:

172

Data:Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c | Open Energy Information  

Open Energy Info (EERE)

Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c Cf8e89dc-02b8-41da-b3ea-3c92b0e3113c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Security Lighting Service- SL (250W Flood) Sector: Lighting Description: To individual consumers for dusk to dawn out door lighting service in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

173

Data:2c99437b-836d-4968-b8ff-f8fd9a6590d3 | Open Energy Information  

Open Energy Info (EERE)

9437b-836d-4968-b8ff-f8fd9a6590d3 9437b-836d-4968-b8ff-f8fd9a6590d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Commercial/Industrial With Discounting Sector: Commercial Description: Available to Coop owned and operated facilities Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

174

Data:C46103cc-5042-4b1e-ad9b-8b792f7aafd6 | Open Energy Information  

Open Energy Info (EERE)

103cc-5042-4b1e-ad9b-8b792f7aafd6 103cc-5042-4b1e-ad9b-8b792f7aafd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Emerson, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 250 watt Mercury Vapor Sector: Lighting Description: All customers are eligible to lease private lighting owned and maintained by NeNPPD. This leased lighting is unmetered and NeNPPD provides all of the energy required. See other side for private lighting service agreement Source or reference: http://nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW):

175

Data:77c9baca-719f-4be9-9c3e-5028686b8b3a | Open Energy Information  

Open Energy Info (EERE)

baca-719f-4be9-9c3e-5028686b8b3a baca-719f-4be9-9c3e-5028686b8b3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/07/01 End date if known: Rate name: NON-RESIDENTIAL SEASONAL SERVICE Single Phase Sector: Commercial Description: * AVAILABILITY Available in all territory served by the Cooperative, subject to the established Service Rules and Regulations of the Cooperative. APPLICABILITY This schedule is applicable to all non-residential seasonal service, including all bulk barns regardless of demand and irrigation accounts not on time-of-use rates.

176

Data:1e316e07-1b8d-405a-a304-b4eef957235d | Open Energy Information  

Open Energy Info (EERE)

6e07-1b8d-405a-a304-b4eef957235d 6e07-1b8d-405a-a304-b4eef957235d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Water Valley, Mississippi (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: Seasonal Demand up to 25,000 kW Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

177

Data:76762687-6f05-451d-bd1d-73b8cee64479 | Open Energy Information  

Open Energy Info (EERE)

6f05-451d-bd1d-73b8cee64479 6f05-451d-bd1d-73b8cee64479 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 400 Watt - Not metered Sector: Lighting Description: Source or reference: Ted Binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

178

Data:30708464-8436-4c5b-8d14-e757e64c5eef | Open Energy Information  

Open Energy Info (EERE)

464-8436-4c5b-8d14-e757e64c5eef 464-8436-4c5b-8d14-e757e64c5eef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: End date if known: Rate name: Four or More Lights 1000-Watt Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

179

Data:Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 | Open Energy Information  

Open Energy Info (EERE)

Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Customer Area Lighting Service- Rate 7: Directional Lighting, Metal Halide, 40,000 Lumen, 400 Watt Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

180

Data:86007d27-b2f6-4a3b-8b17-ffd9daa6a638 | Open Energy Information  

Open Energy Info (EERE)

d27-b2f6-4a3b-8b17-ffd9daa6a638 d27-b2f6-4a3b-8b17-ffd9daa6a638 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Metlakatla Power & Light Effective date: End date if known: Rate name: Street Lights Sector: Lighting Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments A fuel cost adjustment may apply. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:03a98006-b8d1-451b-ae54-e68fe3221409 | Open Energy Information  

Open Energy Info (EERE)

8006-b8d1-451b-ae54-e68fe3221409 8006-b8d1-451b-ae54-e68fe3221409 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sac-Osage Electric Coop Inc Effective date: 2012/03/01 End date if known: Rate name: Non-Commercial Time of Use Rate Sector: Description: Source or reference: http://www.sacosage.com/rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1

182

Data:1676eb7d-2010-4b8f-a4bb-fafb7d027799 | Open Energy Information  

Open Energy Info (EERE)

eb7d-2010-4b8f-a4bb-fafb7d027799 eb7d-2010-4b8f-a4bb-fafb7d027799 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Irrigation Controlled Primary Metering Sector: Commercial Description: *Applicable to any irrigation usage served by the City of Gothenburg. Irrigation season is from April-September. Non-summer months of the irrigation season (April/May) will be billed at the commercial general service rate. Subject to production cost adjustment and power factor adjustment. 1.5% reduction in bill for primary metering.

183

Data:Aecec2b8-760e-4e8f-9a81-5878d6558bf4 | Open Energy Information  

Open Energy Info (EERE)

Aecec2b8-760e-4e8f-9a81-5878d6558bf4 Aecec2b8-760e-4e8f-9a81-5878d6558bf4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2011/10/28 End date if known: Rate name: 2 Area Lighting - Flood light MV - 400W - and 35 foot wood pole Sector: Lighting Description: This rate is applicable under the regular terms and conditions of the company in areas designated by company where facilities of adequate capacity and suitable voltage are available. Source or reference: http://www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_als.pdf Source Parent:

184

Data:Dda78296-ecb4-4a4b-b8cc-2417fbc15092 | Open Energy Information  

Open Energy Info (EERE)

8296-ecb4-4a4b-b8cc-2417fbc15092 8296-ecb4-4a4b-b8cc-2417fbc15092 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bozrah Light & Power Company Effective date: 2013/03/01 End date if known: Rate name: Street and Area Lighting Service Mercury Vapor 250W - Overhead Sector: Lighting Description: For all street lighting fixtures served from, attached to and supported by the Company's existing overhead distribution facilities suitable for supplying the service requested. The Company will furnish, maintain and operate lamps in its standard fixtures. Available only to manufacturers whose Standard Industrial Classification (SIC) codes are between 2000 and 3999 who are exempt from the Connecticut Gross Earnings Tax.

185

Data:0c2253f0-ebc0-4b8d-90d1-2ded8bf6549c | Open Energy Information  

Open Energy Info (EERE)

53f0-ebc0-4b8d-90d1-2ded8bf6549c 53f0-ebc0-4b8d-90d1-2ded8bf6549c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: PRIMARY SERVICE RATE (LESS THAN 1000KW) Sector: Commercial Description: To any customer desiring service for all power and lighting purposes served through a transformer of 500 kVA or more and when the customer furnishes, owns, installs, and maintains his own transformation facilities acceptable to WMS. Source or reference: http://www.wyan.org/assets/electric/Electric%20Rates%20October%202011.pdf

186

Data:86cc7b12-58e9-4b8a-b71b-081223c87e3a | Open Energy Information  

Open Energy Info (EERE)

b12-58e9-4b8a-b71b-081223c87e3a b12-58e9-4b8a-b71b-081223c87e3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 175 W Mercury Vapor- Distribution Pole Sector: Lighting Description: To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Distribution Pole; Open Refractor Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

187

Data:De28e752-63c5-4664-b8e9-289b8196ea02 | Open Energy Information  

Open Energy Info (EERE)

2-63c5-4664-b8e9-289b8196ea02 2-63c5-4664-b8e9-289b8196ea02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/08/23 End date if known: Rate name: 12ft embedded wood pole Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

188

Data:B2081519-6db9-487b-8cb0-cb16dc9bcbca | Open Energy Information  

Open Energy Info (EERE)

19-6db9-487b-8cb0-cb16dc9bcbca 19-6db9-487b-8cb0-cb16dc9bcbca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jay County Rural E M C Effective date: End date if known: Rate name: SCHEDULE P- PUBLIC BUILDING, 1975 OBSOLETE RATE Sector: Commercial Description: EXISTING CUSTOMER ONLY AVAILABILITY Available to existing Bloomfield School TYPE OF SERVICE Three phase at voltage agreeable to consumer and supplier. MONTHLY Source or reference: http://www.jayremc.com/Rates-02-2012a.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

189

Data:2d407fa6-a781-4ae5-ae50-0c238004b8d7 | Open Energy Information  

Open Energy Info (EERE)

-a781-4ae5-ae50-0c238004b8d7 -a781-4ae5-ae50-0c238004b8d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Commercial Elec Space Heating - One Phase Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

190

Data:Ac07146b-8d32-45e7-9042-85f065e602d6 | Open Energy Information  

Open Energy Info (EERE)

Ac07146b-8d32-45e7-9042-85f065e602d6 Ac07146b-8d32-45e7-9042-85f065e602d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Street Lighting Service - Option A - 175 W MH Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. Option A: Utility Owned and Maintained. Power Cost Adjustment Clause: Charge per all kWh varies monthly. See schedule PCAC. Note: HPS = High Pressure Sodium MH = Metal Halide Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

191

Data:4946d009-a1c8-4dad-b8c1-54781a580ced | Open Energy Information  

Open Energy Info (EERE)

09-a1c8-4dad-b8c1-54781a580ced 09-a1c8-4dad-b8c1-54781a580ced No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E7 - 192 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

192

Data:E06da27f-2da7-4aac-b8cf-f6564faf6c90 | Open Energy Information  

Open Energy Info (EERE)

7f-2da7-4aac-b8cf-f6564faf6c90 7f-2da7-4aac-b8cf-f6564faf6c90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-Low Pressure Sodium 35W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements. Monthly Usage: 21.7kWh

193

Data:D12a4ee9-489c-4929-96b2-6324a0b8e925 | Open Energy Information  

Open Energy Info (EERE)

ee9-489c-4929-96b2-6324a0b8e925 ee9-489c-4929-96b2-6324a0b8e925 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Raton Public Service Company Effective date: End date if known: Rate name: Security Lights 3- Prompt Payment Discount Sector: Lighting Description: Security lights are available to all (except as noted) residential, commercial and industrial customers served by the Raton Public Service Company for outside lighting purposes at the voltage and phase of the company's distribution system. RPS owns fixture and pole, power is furnished by customer. RPS furnishes parts & service.

194

Data:6a2de9ee-05d2-47a0-ac68-b8a5f6dfec0c | Open Energy Information  

Open Energy Info (EERE)

ee-05d2-47a0-ac68-b8a5f6dfec0c ee-05d2-47a0-ac68-b8a5f6dfec0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Greenville Utilities Comm Effective date: 2013/04/01 End date if known: Rate name: Optical Network Unit Sector: Commercial Description: This schedule is applicable exclusively to Carolina Telephone and Telegraph Company (CT&T), or its successors, Optical Network Units (ONU). Those devices applicable for this service shall be limited to only those device types expressly identified below and approved in separate agreements between CT&T and the Commission. Energy Charge: Monthly kWh Rate:

195

Data:D1ff7e72-8105-4b89-b8e2-bfb5aa5cf979 | Open Energy Information  

Open Energy Info (EERE)

ff7e72-8105-4b89-b8e2-bfb5aa5cf979 ff7e72-8105-4b89-b8e2-bfb5aa5cf979 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Virginia Elec Coop Effective date: 2010/10/01 End date if known: Rate name: Schedule R-TOU, Residental Time Of Use Service Sector: Residential Description: Applicable to customers otherwise served under schedule R-1. Net Metering consumers are not eligible for this rate. This rate is limited to the first 300 consumers applying for and receiving service. Source or reference: ISU Documents Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

196

Data:51eb61ea-9b8c-4832-b154-882c37442aa4 | Open Energy Information  

Open Energy Info (EERE)

b8c-4832-b154-882c37442aa4 b8c-4832-b154-882c37442aa4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Three Phase - Optional Time-of-Day 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

197

Data:14f0f797-ebba-4e2b-8cbb-9878256c9c4d | Open Energy Information  

Open Energy Info (EERE)

7-ebba-4e2b-8cbb-9878256c9c4d 7-ebba-4e2b-8cbb-9878256c9c4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burt, Iowa (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Commercial Electric Sector: Commercial Description: Applicable to commercial users except those served under rural service or by power services. Source or reference: Rate Binder# 1B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

198

Data:09e46ca5-f8d3-4773-a658-8dc1bcb5b8db | Open Energy Information  

Open Energy Info (EERE)

ca5-f8d3-4773-a658-8dc1bcb5b8db ca5-f8d3-4773-a658-8dc1bcb5b8db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2011/09/01 End date if known: Rate name: Street Lighting Service - 250 W MV Sector: Lighting Description: The CBPU furnishes, installs and owns the entire equipment including poles, overhead lines, supply equipment, luminaries, supporting brackets, suspension cables, lamps and control equipment. The CBPU supplies the energy, replaces luminaries and lamps and maintains the entire equipment. Source or reference: http://www.coldwater.org/Content/Utility_General_Info.html

199

Data:Eb3dd06c-7ad5-4282-8936-97a1aaad9b8a | Open Energy Information  

Open Energy Info (EERE)

6c-7ad5-4282-8936-97a1aaad9b8a 6c-7ad5-4282-8936-97a1aaad9b8a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (1100-1199 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

200

Data:0b1545f7-8058-45b8-8dc9-7bd649e7b271 | Open Energy Information  

Open Energy Info (EERE)

f7-8058-45b8-8dc9-7bd649e7b271 f7-8058-45b8-8dc9-7bd649e7b271 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-Mercury Vapor, Open 175 W Sector: Lighting Description: 7000 Lumens, 175 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:51cd6188-9d1c-43b8-915a-9ba53cb4bdf1 | Open Energy Information  

Open Energy Info (EERE)

cd6188-9d1c-43b8-915a-9ba53cb4bdf1 cd6188-9d1c-43b8-915a-9ba53cb4bdf1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2011/07/01 End date if known: Rate name: RENEWABLE ENERGY PORTFOLIO STANDARD RIDER-Industrial Sector: Industrial Description: APPLICABILITY: Service under this Rider is applicable to all retail consumers of the Cooperative for the recovery of the Cooperative's incremental costs associated with meeting their Renewable Energy Portfolio Standard (REPS) pursuant to North Carolina General Statute 62-133.8 and NCUC Rule R8-67. DEFINITIONS:

202

Data:995e3b8c-6820-4e27-b1cc-4f560d92dba3 | Open Energy Information  

Open Energy Info (EERE)

e3b8c-6820-4e27-b1cc-4f560d92dba3 e3b8c-6820-4e27-b1cc-4f560d92dba3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Night Light Rate- 175 W Mercury Vapor Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

203

Data:A8d3eb43-4902-4e42-ad98-a5cb90037b8c | Open Energy Information  

Open Energy Info (EERE)

eb43-4902-4e42-ad98-a5cb90037b8c eb43-4902-4e42-ad98-a5cb90037b8c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stilwell, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lights - 1000 Watt (pole installation) Sector: Lighting Description: Source or reference: www.cityofstilwell.com/uploads/Ordinance_297__Water__Sewer__Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

204

Data:942f8bd2-b626-4327-9ac0-10cd20b8a30f | Open Energy Information  

Open Energy Info (EERE)

bd2-b626-4327-9ac0-10cd20b8a30f bd2-b626-4327-9ac0-10cd20b8a30f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial Rate#20 (referred to as coop elec-1) Composite Sector: Commercial Description: Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

205

Data:885f1f87-915b-43b5-a329-13b4e6d697b8 | Open Energy Information  

Open Energy Info (EERE)

-915b-43b5-a329-13b4e6d697b8 -915b-43b5-a329-13b4e6d697b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Flood Lights-150W(On Existing Pole-100% Cooperative Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 60kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

206

Data:4679abcb-3960-4b34-86b8-ad0b3071f069 | Open Energy Information  

Open Energy Info (EERE)

abcb-3960-4b34-86b8-ad0b3071f069 abcb-3960-4b34-86b8-ad0b3071f069 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Chattanooga, Tennessee (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: MSD- Extra Large Manufacturer Sector: Industrial Description: This rate shall apply to the firm electric power requirements where (a) a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 25,000 kW, and (b) the major use of electricity is for activities conducted at the delivery point serving that customer which are classified with a 2-digit Standard Industrial Classification Code between 20 and 39

207

Data:2545e613-61b0-4c9b-8bbf-ed81d661b581 | Open Energy Information  

Open Energy Info (EERE)

13-61b0-4c9b-8bbf-ed81d661b581 13-61b0-4c9b-8bbf-ed81d661b581 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE SL-14 SECURITY LIGHTING SERVICE L1 175 WATT WOOD POLE Sector: Lighting Description: AVAILABILITY * Available in all territory served by the Cooperative and subject to the Cooperative's Service Rules and Regulations. APPLICABILITY * Applicable only to outdoor lighting by ballast-operated vapor lamp fixtures and poles conforming to the Cooperative's specifications. Service will be rendered only at locations accessible for maintenance.

208

Data:2999967e-1bbf-4a0c-b8bd-b13abaa464e1 | Open Energy Information  

Open Energy Info (EERE)

99967e-1bbf-4a0c-b8bd-b13abaa464e1 99967e-1bbf-4a0c-b8bd-b13abaa464e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pitt & Greene Elec Member Corp Effective date: End date if known: Rate name: Seasonal Service-Single Phase Sector: Commercial Description: Service under this schedule is available in all territory served by the cooperative subject to the cooperative's established service rules and regulations. Bills rendered June 1st through November 30th is applicable to all members desiring a service who will use 75% of total annual kWh and having atleast a 5 HP or 5 KW connected load.

209

Data:E4c54ab2-96b0-434b-8fc1-fd0428454d6e | Open Energy Information  

Open Energy Info (EERE)

ab2-96b0-434b-8fc1-fd0428454d6e ab2-96b0-434b-8fc1-fd0428454d6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2010/11/01 End date if known: Rate name: AREA LIGHTING SPECIAL RATE FOR LIGHTS - Wide Angle Flood Lights 400w Sector: Lighting Description: "SPECIAL RATE FOR LIGHTS CONNECTED BEHIND CUSTOMER'S METER" Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services.

210

Data:D2c86fec-dd50-4485-b638-365a79d904b8 | Open Energy Information  

Open Energy Info (EERE)

fec-dd50-4485-b638-365a79d904b8 fec-dd50-4485-b638-365a79d904b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Rg-2 Residential Service Single Phase - Optional Time-of-Day 8am-8pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

211

Data:18a8743e-e676-4d31-a1b8-33d45130fc26 | Open Energy Information  

Open Energy Info (EERE)

43e-e676-4d31-a1b8-33d45130fc26 43e-e676-4d31-a1b8-33d45130fc26 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Optional High Load Factor Demand Metered Time of Use (HLF-TOU) Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

212

Data:Db375b54-7015-437a-945b-8e41a9695d72 | Open Energy Information  

Open Energy Info (EERE)

b54-7015-437a-945b-8e41a9695d72 b54-7015-437a-945b-8e41a9695d72 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2009/02/01 End date if known: Rate name: Medium General Service- Three Phase Sector: Commercial Description: This Schedule is available for electric service used at a single point of delivery, at one of the City's standard voltages, used by any non-residential Customer with a monthly demand of 35 kW or greater for at least two of the preceding twelve months, but less than 100 kW for eleven of the preceding twelve months.

213

Data:18f6aa96-79f7-4242-97c8-b570b8e45dda | Open Energy Information  

Open Energy Info (EERE)

6-79f7-4242-97c8-b570b8e45dda 6-79f7-4242-97c8-b570b8e45dda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Non-Residential Service Sector: Commercial Description: See Source Source or reference: http://www.weci.org/lib/sitefiles/pdf/Non_Residential_Rate.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

214

Data:3549f3b5-25eb-49b8-b42d-fb2bef6a9de7 | Open Energy Information  

Open Energy Info (EERE)

b5-25eb-49b8-b42d-fb2bef6a9de7 b5-25eb-49b8-b42d-fb2bef6a9de7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Street Lighting 100 Watt HPS (city owned) Sector: Lighting Description: Service under this schedule shall be available to municipalities, incorporated cities, towns or lighting districts for the illumination of streets, roadways, thoroughfares, and alleys. Lighting Structure: 35-foot wood pole $ 10.00 Source or reference: http://www.pacificpud.org/rate_street.html Source Parent: Comments Applicability

215

Data:5a561cdb-c372-46b8-9072-f6fd7f0e7fa6 | Open Energy Information  

Open Energy Info (EERE)

cdb-c372-46b8-9072-f6fd7f0e7fa6 cdb-c372-46b8-9072-f6fd7f0e7fa6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russellville, Kentucky (Utility Company) Effective date: End date if known: Rate name: 250W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.russepb.com/rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

216

Data:C6a28729-e7d2-4b8b-98eb-52d496f7849c | Open Energy Information  

Open Energy Info (EERE)

-e7d2-4b8b-98eb-52d496f7849c -e7d2-4b8b-98eb-52d496f7849c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 400 W HPS Street Lighting, Metered Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Rate when light is Metered through customer's service. Source or reference: Rate binder # 4(Illinios State University)

217

Data:29166ac5-4a9a-4dae-b635-aea4e3b8c30c | Open Energy Information  

Open Energy Info (EERE)

ac5-4a9a-4dae-b635-aea4e3b8c30c ac5-4a9a-4dae-b635-aea4e3b8c30c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-1 STREET AND HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 400W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations supplied from overhead lines, where the District owns and maintains the entire equipment. Monthly Usage: 160kWh Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2577 Source Parent:

218

Data:7fc2c13a-63cd-40c8-acf3-7fe466aa77b8 | Open Energy Information  

Open Energy Info (EERE)

c13a-63cd-40c8-acf3-7fe466aa77b8 c13a-63cd-40c8-acf3-7fe466aa77b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2011/04/01 End date if known: Rate name: Rate Schedule I (Interruptible) Sector: Commercial Description: Available to cooperative members requiring three phase and/or single phase electric service with the capability of reducing their electric load during interruption periods. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

219

Data:F669b335-85b8-44ba-96cc-f5152705515b | Open Energy Information  

Open Energy Info (EERE)

69b335-85b8-44ba-96cc-f5152705515b 69b335-85b8-44ba-96cc-f5152705515b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Colonial Post Top 150 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

220

Data:Aba9568b-367c-44f3-83be-f130e11718b8 | Open Energy Information  

Open Energy Info (EERE)

Aba9568b-367c-44f3-83be-f130e11718b8 Aba9568b-367c-44f3-83be-f130e11718b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Ridge Elec Member Corp Effective date: 2010/03/03 End date if known: Rate name: Residential - Three-Phase Sector: Residential Description: * The Cooperative will furnish 60-cycle service through one meter at the following approximate voltages where available: Single-phase, 120/240 Volts, or Three-phase, 208Y/120 Volts, or Three-phase, three wire, 240 Volts Prospective members should ascertain the available supply voltage at the nearest Cooperative office before acquiring equipment.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:7ee2786f-5d7a-4792-a8a1-6446b8de9844 | Open Energy Information  

Open Energy Info (EERE)

5d7a-4792-a8a1-6446b8de9844 5d7a-4792-a8a1-6446b8de9844 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 250W HPS Sector: Commercial Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

222

Data:Ca26c740-1b8a-4f18-8837-cf101c6844a3 | Open Energy Information  

Open Energy Info (EERE)

0-1b8a-4f18-8837-cf101c6844a3 0-1b8a-4f18-8837-cf101c6844a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Grand Island, Nebraska (Utility Company) Effective date: 2006/10/01 End date if known: Rate name: Area Flood Lighting Sector: Lighting Description: Applicable in the territory served by the City of Grand Island; and is available for any outdoor area floodlighting of consumer's property from dusk to dawn, where such service can be rendered directly from existing secondary distribution lines of the City. Source or reference: http://city.grand-island.com/City_Code/ref_code_index.htm

223

Data:A1927e07-4bce-420f-b8ee-4b7d88057d74 | Open Energy Information  

Open Energy Info (EERE)

e07-4bce-420f-b8ee-4b7d88057d74 e07-4bce-420f-b8ee-4b7d88057d74 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Street Lighting 200 Watt HPS (cities) Sector: Lighting Description: Service under this schedule shall be available to municipalities, incorporated cities, towns or lighting districts for the illumination of streets, roadways, thoroughfares, and alleys. Lighting Structure: 35-foot wood pole $ 10.00 Source or reference: http://www.pacificpud.org/rate_street.html Source Parent: Comments Applicability

224

Data:Fd05f460-25b7-46f9-97b1-b8c181401fe4 | Open Energy Information  

Open Energy Info (EERE)

60-25b7-46f9-97b1-b8c181401fe4 60-25b7-46f9-97b1-b8c181401fe4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of West Point, Mississippi (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: General Power Service- GSA 2 Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

225

Data:49f00575-e849-4f3d-b8ef-67dfe75e1c19 | Open Energy Information  

Open Energy Info (EERE)

575-e849-4f3d-b8ef-67dfe75e1c19 575-e849-4f3d-b8ef-67dfe75e1c19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Residential Sector: Residential Description: This schedule is available only to customers dwelling in residences, condominiums, mobile homes, or individually-metered apartments which provide independent and permanent facilities complete for living, sleeping, eating, cooking, and sanitation. Source or reference: http://www.concordnc.gov/LinkClick.aspx?fileticket=53Al67tluGU%3d&tabid=580&mid=1145

226

Data:4e532fab-5202-4b8e-b35e-defd6e480ffd | Open Energy Information  

Open Energy Info (EERE)

fab-5202-4b8e-b35e-defd6e480ffd fab-5202-4b8e-b35e-defd6e480ffd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-3 and BGS-3 Zone 3 - General Delivery Service 600V or Less Sector: Industrial Description: Availability: Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that has demand metering installed and a maximum monthly Demand equal to or greater than 150 kilowatts (kW) but less than 1,000 kW as qualified in the Delivery Service Rate Reassignment section.

227

Data:Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 | Open Energy Information  

Open Energy Info (EERE)

Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 Ab43dcc9-7038-4e96-b8ff-1f5fff80ef49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: URBAN RESIDENTIAL (Rate Code 23) Sector: Residential Description: AVAILABILITY: To residential customers within the corporate limits of the municipalities served by the District. The entire residential service, including any electric space heating and/or water heating service, must be taken through a single meter. TYPE OF SERVICE: A.C., 60 cycles, single-phase or three-phase at any of the District's standard voltages.

228

Data:Ae277b8a-06b7-4666-8b14-8019b0d7753c | Open Energy Information  

Open Energy Info (EERE)

b8a-06b7-4666-8b14-8019b0d7753c b8a-06b7-4666-8b14-8019b0d7753c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Residential Rate CYC 2/REV1 - Three Phase Sector: Residential Description: Source or reference: Illinois State University #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

229

Data:5020cc5b-8ec7-44f4-8697-c27d352bcf5d | Open Energy Information  

Open Energy Info (EERE)

cc5b-8ec7-44f4-8697-c27d352bcf5d cc5b-8ec7-44f4-8697-c27d352bcf5d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: General Service Single Phase Sector: Description: Available to farm home and residential customers subject to the established rules and regulations of the cooperative. No resale, standby, or auxiliary service permitted. Source or reference: ISU Documentation Rate Binder Kelly 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

230

Data:D8f17bd4-b6b1-4602-9ddf-65f907b8e2bf | Open Energy Information  

Open Energy Info (EERE)

b6b1-4602-9ddf-65f907b8e2bf b6b1-4602-9ddf-65f907b8e2bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 1000W HPS - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

231

Data:6525d13c-0eaf-4cf4-900c-31e9b8a64560 | Open Energy Information  

Open Energy Info (EERE)

5d13c-0eaf-4cf4-900c-31e9b8a64560 5d13c-0eaf-4cf4-900c-31e9b8a64560 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Peabody, Massachusetts (Utility Company) Effective date: 2010/05/01 End date if known: Rate name: Agriculture or Farming Sector: Commercial Description: CUSTOMER ACCOUNT SUB-CLASSES: For recordkeeping purposes, the customer accounts served hereunder are divided into four (4) sub-classes, as follows: F-1 With secondary metering and with transformer(s) furnished by PMLP. F-2 With primary metering and with transformer(s) furnished by PMLP. F-3 With secondary metering and with transformer(s)

232

Data:0d736190-d3b8-4fc0-bfc0-0034d0002f28 | Open Energy Information  

Open Energy Info (EERE)

d3b8-4fc0-bfc0-0034d0002f28 d3b8-4fc0-bfc0-0034d0002f28 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting MV 400 W Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

233

Data:B6995793-7bbe-4717-8b8a-7fe99c1fe735 | Open Energy Information  

Open Energy Info (EERE)

3-7bbe-4717-8b8a-7fe99c1fe735 3-7bbe-4717-8b8a-7fe99c1fe735 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Interruptable Heat/Water Sector: Description: This rate is applicable for customers who have General Service. Usage under this rate would be tracked by a 2nd meter. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

234

Data:95f1ab85-f0b8-4f49-ad1b-bcc9d474fb9a | Open Energy Information  

Open Energy Info (EERE)

5-f0b8-4f49-ad1b-bcc9d474fb9a 5-f0b8-4f49-ad1b-bcc9d474fb9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2010/01/01 End date if known: Rate name: 355- COGENERATING AND SMALL POWER PRODUCING FACILITIES TOU Sector: Commercial Description: To all Consumers who have qualified cogenerating or small power producing facilities and have the appropriate metering to measure the delivery of electric energy to the District. Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

235

Data:83b73748-f24a-4ab2-9fac-07c4b8ab0095 | Open Energy Information  

Open Energy Info (EERE)

8-f24a-4ab2-9fac-07c4b8ab0095 8-f24a-4ab2-9fac-07c4b8ab0095 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: SECURITY LIGHTING SERVICE Mercury Vapor 175 W Sector: Lighting Description: AVAILABILITY: Electric service is available under this schedule for lighting of outdoors areas when the Cooperative owns the fixtures. The Cooperative will install fixtures on its distribution system poles and provide illumination from dusk to dawn. SERVICE: Installation of any security light requires a deposit of $30.

236

Data:C01faa18-b8f7-4110-830c-9281f26a3051 | Open Energy Information  

Open Energy Info (EERE)

8-b8f7-4110-830c-9281f26a3051 8-b8f7-4110-830c-9281f26a3051 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2009/06/01 End date if known: Rate name: Schedule SL - Street Lighting Service - Mercury Vapor 250 watts Sector: Lighting Description: Total Charge = $3.41 plus 100 kWh/Light/month @ GP-1 Rate. 11.647 = $3.41 + (.08237 x 100) Source or reference: Kentucky Public Service Commision Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

237

Data:4d94d250-d44d-498d-b6b8-38cff1684360 | Open Energy Information  

Open Energy Info (EERE)

d250-d44d-498d-b6b8-38cff1684360 d250-d44d-498d-b6b8-38cff1684360 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Klickitat County Effective date: End date if known: Rate name: Irrigation Service TOU Three Phase Sector: Description: Source or reference: http://www.klickitatpud.com/ratesAndPolicies/electricRates/rateSchedule51.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

238

Data:Cfefc022-8126-4b6b-8fad-cda2658c08cc | Open Energy Information  

Open Energy Info (EERE)

Cfefc022-8126-4b6b-8fad-cda2658c08cc Cfefc022-8126-4b6b-8fad-cda2658c08cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: TOU (RTE5,RTC5,RTG5) Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments FRA= Solar Surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

239

Data:C14f71fd-8781-479b-8d11-e8146198c23c | Open Energy Information  

Open Energy Info (EERE)

fd-8781-479b-8d11-e8146198c23c fd-8781-479b-8d11-e8146198c23c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: 14- Irrigation - Anytime Control & Sunday control Sector: Commercial Description: Demand---19.50/.746=26.139 Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

240

Data:3589ec4e-0585-46fe-b8e2-4b04c71f4090 | Open Energy Information  

Open Energy Info (EERE)

e-0585-46fe-b8e2-4b04c71f4090 e-0585-46fe-b8e2-4b04c71f4090 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Irrigation Service--Schedule IR Sector: Commercial Description: Available to Members of the Cooperative for irrigation service with a maximum monthly demand of less than 100 KW. The maximum monthly demand shall be the highest actual demand of any month, in a twelve month period, not an average for the twelve (12) month's monthly demand. Source or reference: http://www.delaware.coop/my-services/commercial-and-industrial/billing/rates

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:9f68f3ba-9bb7-485b-8b74-08351bb959b7 | Open Energy Information  

Open Energy Info (EERE)

ba-9bb7-485b-8b74-08351bb959b7 ba-9bb7-485b-8b74-08351bb959b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: TOWN ELECTRIC SPACE HEATING SERVICE - RATE CLASS 53 Sector: Commercial Description: Source or reference: http://www.custerpower.com/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

242

Data:512bc36d-9805-4791-b8bb-f4f60853f77c | Open Energy Information  

Open Energy Info (EERE)

bc36d-9805-4791-b8bb-f4f60853f77c bc36d-9805-4791-b8bb-f4f60853f77c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: 357- MUNICIPAL SERVICE Sector: Commercial Description: To Municipal Utilities throughout the District's Service Area. The three phase, alternating current, electric service will be supplied by the District at a voltage not less than 2400 volts for use through a municipally-owned and maintained distribution system. Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110

243

Data:A2e773cf-f80c-4108-9b8e-24b17e9cf450 | Open Energy Information  

Open Energy Info (EERE)

3cf-f80c-4108-9b8e-24b17e9cf450 3cf-f80c-4108-9b8e-24b17e9cf450 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Security Lighting Service-1000W Metal Halide Coop-Owned & Maintained Sector: Lighting Description: Available upon application to all consumers for illumination of outdoor areas at any point on or near the Cooperative's distribution or service lines. Additional Poles (incl. up to 150' of wire) = $2.00/pole/month Transformers or Secondary Line installed for lighting use only = $2.00/transformer/month

244

Data:A4866079-9938-49b8-855b-2067c83bf62f | Open Energy Information  

Open Energy Info (EERE)

79-9938-49b8-855b-2067c83bf62f 79-9938-49b8-855b-2067c83bf62f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/11/01 End date if known: Rate name: SCHEDULE SL-3 STREET AND HIGHWAY LIGHTING SERVICE-MERCURY VAPOR 250W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations where the customer owns the equipment and the District furnishes energy at one or more central points and maintains the equipment in accordance with Special Conditions set forth herein. Monthly Usage: 105kWh Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2579

245

Data:2ae8b341-f88c-4884-b0b8-fbc19490afc0 | Open Energy Information  

Open Energy Info (EERE)

1-f88c-4884-b0b8-fbc19490afc0 1-f88c-4884-b0b8-fbc19490afc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Discount Rate Single Phase Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

246

Data:E7e3d0ae-0896-469f-b8d0-3bb49b792880 | Open Energy Information  

Open Energy Info (EERE)

ae-0896-469f-b8d0-3bb49b792880 ae-0896-469f-b8d0-3bb49b792880 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bozrah Light & Power Company Effective date: 2013/03/01 End date if known: Rate name: Street and Area Lighting Service High Pressure Sodium 100W - Overhead Sector: Lighting Description: For all street lighting fixtures served from, attached to and supported by the Company's existing overhead distribution facilities suitable for supplying the service requested. The Company will furnish, maintain and operate lamps in its standard fixtures. Available only to manufacturers whose Standard Industrial Classification (SIC) codes are between 2000 and 3999 who are exempt from the Connecticut Gross Earnings Tax.

247

Data:349c38fb-933a-45f0-bac4-0ca6e590b8e6 | Open Energy Information  

Open Energy Info (EERE)

8fb-933a-45f0-bac4-0ca6e590b8e6 8fb-933a-45f0-bac4-0ca6e590b8e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 130000 Lumen 1130 Watt SVP Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

248

Data:A9ed6577-fdab-463b-8ec3-1b7e69e16b85 | Open Energy Information  

Open Energy Info (EERE)

577-fdab-463b-8ec3-1b7e69e16b85 577-fdab-463b-8ec3-1b7e69e16b85 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kiwash Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Commercial and Industrial 10 kVa of Transformer Capacity or less Sector: Commercial Description: Available for commercial, industrial, and three phase farm service for all uses, including lighting, heating, and power, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Sharepoint Documentation Source Parent: Comments Energy Charge= Operations Charge + Wholesale Power Charge ($0.05250 per kWh)

249

Data:139aaff0-73b9-42ac-b8a7-e5f1048a82c7 | Open Energy Information  

Open Energy Info (EERE)

aaff0-73b9-42ac-b8a7-e5f1048a82c7 aaff0-73b9-42ac-b8a7-e5f1048a82c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: Outdoor Area Lighting HPS 200w Sector: Lighting Description: For outdoor area lighting service furnished primarily to illuminate property from dusk to dawn by means of Emerald-owned luminaries. The customer shall pay all costs associated with the installation. Luminaries shall be mounted on Emerald-owned pole and served in accordance with Emerald's specification as to equipment and installation.

250

Data:A81693b8-f594-43ef-91a0-13196a1745fd | Open Energy Information  

Open Energy Info (EERE)

693b8-f594-43ef-91a0-13196a1745fd 693b8-f594-43ef-91a0-13196a1745fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 100W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Cobra',FiberglassPole(3)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

251

Data:192a07b0-8154-4e3b-8e4d-3aabe867d72a | Open Energy Information  

Open Energy Info (EERE)

8154-4e3b-8e4d-3aabe867d72a 8154-4e3b-8e4d-3aabe867d72a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/03/01 End date if known: Rate name: Single Phase Master Metered (Demand) RV Parks Sector: Residential Description: The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery. The Monthly Charge is the sum of the Customer Service, Fixed Local Access, Variable Local Access, Demand, Transmission, Power Charges and the Bonneville Power Administration (BPA) Power Cost Adjustment at the following rates.

252

Data:7a0ac112-cbec-40fe-8d12-b8c97c1849a0 | Open Energy Information  

Open Energy Info (EERE)

2-cbec-40fe-8d12-b8c97c1849a0 2-cbec-40fe-8d12-b8c97c1849a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W High Pressure Sodium- Urban, New Pole w/UG Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

253

Data:3a66dc95-9503-42b6-83b8-7d5a75fb6694 | Open Energy Information  

Open Energy Info (EERE)

dc95-9503-42b6-83b8-7d5a75fb6694 dc95-9503-42b6-83b8-7d5a75fb6694 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 2 of Grant County Effective date: 2002/01/01 End date if known: Rate name: ALTERNATIVE ENERGY RESOURCES RATE SCHEDULE 13 Sector: Commercial Description: AVAILABLE: To all metered retail customers within the District's retail service territory. ALTERNATIVE ENERGY RESOURCES PROGRAM. This program provides the customer with the voluntary option to purchase qualified alternative energy resources, as required by RCW Chapter 19.29A. The District may provide alternative energy resources from any qualifying resource.

254

Data:5e08d34b-8af4-4b48-9165-0deed1281d38 | Open Energy Information  

Open Energy Info (EERE)

d34b-8af4-4b48-9165-0deed1281d38 d34b-8af4-4b48-9165-0deed1281d38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: FARM AND HOME SERVICE - Up to 25 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

255

Data:B12a96b8-e5dc-4002-a47e-f82fe67c5828 | Open Energy Information  

Open Energy Info (EERE)

b8-e5dc-4002-a47e-f82fe67c5828 b8-e5dc-4002-a47e-f82fe67c5828 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mille Lacs Energy Cooperative Effective date: End date if known: Rate name: General Service Sector: Residential Description: Availability Available for all non-commercial service Source or reference: Rate Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

256

Data:4be96f8a-2876-429b-8b96-efe099a1f812 | Open Energy Information  

Open Energy Info (EERE)

f8a-2876-429b-8b96-efe099a1f812 f8a-2876-429b-8b96-efe099a1f812 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: General (GSA Part 1) - Customer Charge #1 Sector: Commercial Description: * < 50 kW Demand General Power Rate - "applies to the firm power requirements for electric service to commercial, industrial, and governmental customers; institutional customers including but not limited to, churches, clubs, and like customers, except to whom service is available under other resale rate schedules."

257

Data:76bcd8d3-3868-4213-9b64-3b8bc46ab117 | Open Energy Information  

Open Energy Info (EERE)

bcd8d3-3868-4213-9b64-3b8bc46ab117 bcd8d3-3868-4213-9b64-3b8bc46ab117 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Interstate Power and Light Co Effective date: 2011/02/25 End date if known: Rate name: Large General Service - High Load Factor Sector: Industrial Description: Available only for transmission voltage level supply or above. Customer assumes all responsibility transforming voltage from transmission level. A service contract will be required. Service hereunder is also subject to Company's Rules and Regulations. Source or reference: https://www.alliantenergy.com/wcm/groups/wcm_internet/@int/@tariff/documents/document/026384.pdf

258

Data:16253744-f4c8-4a5a-8156-b8f4f239e141 | Open Energy Information  

Open Energy Info (EERE)

44-f4c8-4a5a-8156-b8f4f239e141 44-f4c8-4a5a-8156-b8f4f239e141 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Fife - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

259

Data:Ae97626b-8b7a-4284-8413-93a5c5e7eb49 | Open Energy Information  

Open Energy Info (EERE)

26b-8b7a-4284-8413-93a5c5e7eb49 26b-8b7a-4284-8413-93a5c5e7eb49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting MH 400 W Dedicated Pole & Transformer Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

260

Data:Da21989b-cfcc-48b8-a21d-d9c92609b03e | Open Energy Information  

Open Energy Info (EERE)

1989b-cfcc-48b8-a21d-d9c92609b03e 1989b-cfcc-48b8-a21d-d9c92609b03e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harrison County Rural E M C Effective date: 2013/05/01 End date if known: Rate name: SL - 400W Metal Halide Directional S/L Sector: Lighting Description: Source or reference: www.harrisonremc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:7cf1840e-73e6-44b8-b3bd-623df9f7ce8b | Open Energy Information  

Open Energy Info (EERE)

e-73e6-44b8-b3bd-623df9f7ce8b e-73e6-44b8-b3bd-623df9f7ce8b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Large Power With Discount Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

262

Data:D6ea2548-266f-479a-b758-b8e88818643f | Open Energy Information  

Open Energy Info (EERE)

548-266f-479a-b758-b8e88818643f 548-266f-479a-b758-b8e88818643f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 175W MV-Open, OVERHEAD WIRING, Wood Pole (kWh - 10, Consumers Per Light - 6) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

263

Data:Bbf63378-b754-4fbc-b351-653b8fcfb70d | Open Energy Information  

Open Energy Info (EERE)

Bbf63378-b754-4fbc-b351-653b8fcfb70d Bbf63378-b754-4fbc-b351-653b8fcfb70d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Rate Sector: Residential Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

264

Data:Ebc347b8-898f-4ea1-91c2-3b9c60df459f | Open Energy Information  

Open Energy Info (EERE)

47b8-898f-4ea1-91c2-3b9c60df459f 47b8-898f-4ea1-91c2-3b9c60df459f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: General Service Single Phase Sector: Residential Description: The schedule is available for electric service to each individual residence, school, church, or community hall, in all territory served by the Cooperative, that takes service at one delivery point through one kilowatt-hour meter. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

265

Data:85c3f715-c2af-48ce-9bce-2bd49ff241b8 | Open Energy Information  

Open Energy Info (EERE)

f715-c2af-48ce-9bce-2bd49ff241b8 f715-c2af-48ce-9bce-2bd49ff241b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Street Lighting (SL) Rate 175 Watt Metal Halide Sector: Lighting Description: For municipal street lighting on city-accepted streets. Source or reference: https://www.burlingtonelectric.com/ELBO/assets/Tariff%20Sheets%20June%20262009%20revised-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

266

Data:Fccc2710-dac8-48c4-b8e2-89ec35255478 | Open Energy Information  

Open Energy Info (EERE)

Fccc2710-dac8-48c4-b8e2-89ec35255478 Fccc2710-dac8-48c4-b8e2-89ec35255478 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 07 Commercial & Industrial Demand Metered Single Phase CT Metering Sector: Description: Source or reference: ISU Documentation DOE Sharepoint Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

267

Data:D4fad5c2-1c08-4651-b8d2-270458bb8499 | Open Energy Information  

Open Energy Info (EERE)

fad5c2-1c08-4651-b8d2-270458bb8499 fad5c2-1c08-4651-b8d2-270458bb8499 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawkeye Tri-County El Coop Inc Effective date: End date if known: Rate name: Outdoor Lighting Non-Metered General Sector: Lighting Description: Source or reference: http://www.hawkeyerec.com/services/security_lights.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

268

Data:A2b8ca9d-fe11-45d2-960d-718637e00864 | Open Energy Information  

Open Energy Info (EERE)

b8ca9d-fe11-45d2-960d-718637e00864 b8ca9d-fe11-45d2-960d-718637e00864 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting HPS 400 W Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW):

269

Data:3c2d65cf-f40d-4d39-9db8-aa39ef4875b8 | Open Energy Information  

Open Energy Info (EERE)

cf-f40d-4d39-9db8-aa39ef4875b8 cf-f40d-4d39-9db8-aa39ef4875b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2010/04/07 End date if known: Rate name: Lighting Rate Schedule No. 8-Owned By District-Standard Pole - Steel - 30 Ft-150 Watt Sector: Lighting Description: Applicability: Applicable to any type of photocell operated fixtures, either individual or multiple, operated from dusk to dawn. Source or reference: http://www.ed2.com/Docs/Rates/Security%20and%20Street%20Lighting%20Schedule%20No.%208.pdf Source Parent: Comments Applicability Demand (kW)

270

Data:C5f47251-d92b-4ce0-b688-015b8c45157b | Open Energy Information  

Open Energy Info (EERE)

251-d92b-4ce0-b688-015b8c45157b 251-d92b-4ce0-b688-015b8c45157b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Cobra Head 50 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

271

Data:422debe8-ee03-42e0-869f-1cf45b8e644c | Open Energy Information  

Open Energy Info (EERE)

2debe8-ee03-42e0-869f-1cf45b8e644c 2debe8-ee03-42e0-869f-1cf45b8e644c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sierra Electric Coop, Inc Effective date: End date if known: Rate name: l Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures Period/Month Matchup January

272

Data:0b168446-d5b8-4c0f-ba9e-156fa1655457 | Open Energy Information  

Open Energy Info (EERE)

446-d5b8-4c0f-ba9e-156fa1655457 446-d5b8-4c0f-ba9e-156fa1655457 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OUTDOOR LIGHTING (High Pressure Sodium- 100 watts) Sector: Lighting Description: Rate with Existing Pole(High Pressure Sodium - 100 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

273

Data:E710dbca-01f1-41b8-a2ac-9680233ac368 | Open Energy Information  

Open Energy Info (EERE)

dbca-01f1-41b8-a2ac-9680233ac368 dbca-01f1-41b8-a2ac-9680233ac368 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E6 - 155 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

274

Data:09b38559-96ea-466e-8e9d-b8d043094596 | Open Energy Information  

Open Energy Info (EERE)

559-96ea-466e-8e9d-b8d043094596 559-96ea-466e-8e9d-b8d043094596 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Mansfield, Massachusetts (Utility Company) Effective date: End date if known: Rate name: BACKUP AND STANDYBY RATE Sector: Commercial Description: This rate shall be applied to all partial requirements general service Customers (the Customer) who take firm backup and standby service. A partial requirements Customer is defined as one who normally self-generates all, or a portion of, the Customer's electrical power and energy requirements. Source or reference: http://www.mansfieldelectric.com/services.html

275

Data:2d7c01ee-74f6-437e-aeee-09aae6af76b8 | Open Energy Information  

Open Energy Info (EERE)

ee-74f6-437e-aeee-09aae6af76b8 ee-74f6-437e-aeee-09aae6af76b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE RE - Residential All Elecric Sector: Residential Description: *Fixed Monthly Charge = $10.40 + REPS($0.47) = $10.87 Source or reference: *Binder "A" Gastonia, North Carolina Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

276

Data:B7a37e20-6c95-4204-9953-0b5b8c483adc | Open Energy Information  

Open Energy Info (EERE)

e20-6c95-4204-9953-0b5b8c483adc e20-6c95-4204-9953-0b5b8c483adc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Lighting - DHPS 100 W Developer contributed Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

277

Data:Cb916013-2959-4e37-a6d7-29f3034ac7b8 | Open Energy Information  

Open Energy Info (EERE)

16013-2959-4e37-a6d7-29f3034ac7b8 16013-2959-4e37-a6d7-29f3034ac7b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: RESIDENTIAL SERVICE Postpaid Account Sector: Lighting Description: AVAILABILITY: Electric service is available under this Schedule for residential use and incidental farm and other use supplied through one meter to each resident, farm building, or apartment unit. Service under this Schedule is not available for commercial or other business establishments, institutions, and farm or residential uses with individual motors in excess of 10 horsepower.

278

Data:C369a53f-0dc3-4340-9f4a-6b02726de0b8 | Open Energy Information  

Open Energy Info (EERE)

f-0dc3-4340-9f4a-6b02726de0b8 f-0dc3-4340-9f4a-6b02726de0b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sylvania, Georgia (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Industrial Electric Under 500 DMD Sector: Industrial Description: Source or reference: Rate Binder #2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

279

Data:21c51a97-f470-457b-8f85-b65c608fcc4f | Open Energy Information  

Open Energy Info (EERE)

f470-457b-8f85-b65c608fcc4f f470-457b-8f85-b65c608fcc4f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Public Power District Effective date: 2013/01/01 End date if known: Rate name: Commercial/Industrial Single/Three Phase Rate 06 Sector: Industrial Description: Source or reference: http://www.butlerppd.com/common/New%20Customer%20Packet%20_1.2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

280

Data:1c4888b8-e97c-4a90-bff4-3fbe126b9f67 | Open Energy Information  

Open Energy Info (EERE)

c4888b8-e97c-4a90-bff4-3fbe126b9f67 c4888b8-e97c-4a90-bff4-3fbe126b9f67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Large Commercial- Irrigation Pasture Single Phase Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:9604029d-8f65-4d5a-b8ff-445d67e02401 | Open Energy Information  

Open Energy Info (EERE)

f65-4d5a-b8ff-445d67e02401 f65-4d5a-b8ff-445d67e02401 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Private Area Lighting- (400W HPS) Sector: Lighting Description: Applicable to customers, other than Street Light Districts, for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

282

Data:62025b45-1476-40b8-9979-e21c1b18a721 | Open Energy Information  

Open Energy Info (EERE)

b45-1476-40b8-9979-e21c1b18a721 b45-1476-40b8-9979-e21c1b18a721 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 400W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'MH-Flood',FiberglassPole(3)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

283

Data:3e993494-ff87-4728-b8a9-e8fb7dedf5d3 | Open Energy Information  

Open Energy Info (EERE)

94-ff87-4728-b8a9-e8fb7dedf5d3 94-ff87-4728-b8a9-e8fb7dedf5d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: 2013/06/01 End date if known: Rate name: GSA-Part 2 Sector: Commercial Description: Source or reference: http://www.tcemc.org/index.php/business-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

284

Data:F0788e13-d1a7-4262-84b8-db1d7ad75301 | Open Energy Information  

Open Energy Info (EERE)

d1a7-4262-84b8-db1d7ad75301 d1a7-4262-84b8-db1d7ad75301 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Mercury Vapor, 46000 Lumen, 1000 watts, Class A Sector: Lighting Description: Class A: Sodium Vapor or Mercury Vapor Lamps, owned and operated by Municipality. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

285

Data:78a48599-89b8-4bb4-8438-7958b2593cb1 | Open Energy Information  

Open Energy Info (EERE)

599-89b8-4bb4-8438-7958b2593cb1 599-89b8-4bb4-8438-7958b2593cb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2013/06/01 End date if known: Rate name: 680 - Commercial Supplemental Back-Up Service - Secondary (7kW +) Sector: Commercial Description: Source or reference: www.lipower.org/pdfs/account/rates_comm.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

286

Data:Bf4ae8bd-cf9f-42d4-92b8-b3111cf6e0ee | Open Energy Information  

Open Energy Info (EERE)

bd-cf9f-42d4-92b8-b3111cf6e0ee bd-cf9f-42d4-92b8-b3111cf6e0ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2011/01/01 End date if known: Rate name: RSW31 Sector: Commercial Description: Source or reference: http://www.adamsec.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

287

Data:C9ce434c-291d-44df-b8be-9bd29501c426 | Open Energy Information  

Open Energy Info (EERE)

C9ce434c-291d-44df-b8be-9bd29501c426 C9ce434c-291d-44df-b8be-9bd29501c426 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2013/02/01 End date if known: Rate name: Rate Schedule L (HPR) Sector: Lighting Description: The rate schedule is applicable for area and street lighting service to homes, businesses, municipal local and state government bodies, public authorities, residential subdivision of permanent or mobile homes for security lighting and for lighting of streets, highways, parks and similar places. 150 watt high pressure sodium horizontal burning roadway light mounted on a wooden pole - estimated power usage 68 kWh/mo.

288

Data:6b7d7bf5-c94b-45d1-83b8-9461fbcc2a2b | Open Energy Information  

Open Energy Info (EERE)

-c94b-45d1-83b8-9461fbcc2a2b -c94b-45d1-83b8-9461fbcc2a2b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W Mercury Vapor- Urban, New Pole w/UG Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

289

Data:B974b2b8-ef21-4643-a755-ad38f0d4ddc4 | Open Energy Information  

Open Energy Info (EERE)

b8-ef21-4643-a755-ad38f0d4ddc4 b8-ef21-4643-a755-ad38f0d4ddc4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Cobrahead- HPS 100 Watt Gray (UG) Sector: Lighting Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

290

Data:Eb91fbca-b665-4a3b-8c7b-218982b771a0 | Open Energy Information  

Open Energy Info (EERE)

Eb91fbca-b665-4a3b-8c7b-218982b771a0 Eb91fbca-b665-4a3b-8c7b-218982b771a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 100 watt Incandescent Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

291

Data:A8e2fa36-33b8-401f-8362-839eebe4090e | Open Energy Information  

Open Energy Info (EERE)

fa36-33b8-401f-8362-839eebe4090e fa36-33b8-401f-8362-839eebe4090e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Argyle, Wisconsin (Utility Company) Effective date: 2008/05/29 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period. Motors may not exceed 10 horsepower individual-rated capacity without utility permission.

292

Data:4bc61b8d-4a56-472d-adf0-d68cfda6e45c | Open Energy Information  

Open Energy Info (EERE)

bc61b8d-4a56-472d-adf0-d68cfda6e45c bc61b8d-4a56-472d-adf0-d68cfda6e45c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barnesville, Georgia (Utility Company) Effective date: 2011/11/01 End date if known: Rate name: Electric Rates- Large Industrial Sector: Industrial Description: This rate schedule applies to any new or expanded retail contract load added to the city's system at one standard available voltage, delivered at one metering point and compensated to that voltage. Subject to Power Cost Adjustment(PCA) Base charge= $500 Facilities charge= $600 Source or reference: Rate Binder # 2

293

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons)  

U.S. Energy Information Administration (EIA)

Wisconsin No 2 Diesel Off-Highway Construction (Thousand Gallons) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's: 16,323: 12,292 ...

294

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

295

Data:26ce28a2-0c4e-4fb2-b8df-bd6c342350e4 | Open Energy Information  

Open Energy Info (EERE)

ce28a2-0c4e-4fb2-b8df-bd6c342350e4 ce28a2-0c4e-4fb2-b8df-bd6c342350e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Argyle, Wisconsin (Utility Company) Effective date: 2008/05/29 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Application: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Customers who do not meet these criteria will be served under the applicable rate. Fixed Monthly Charge includes Commitment to Community Rider: $1.34 per customer per month

296

Data:09ee9647-a302-439b-b8f1-d49d426e6d80 | Open Energy Information  

Open Energy Info (EERE)

ee9647-a302-439b-b8f1-d49d426e6d80 ee9647-a302-439b-b8f1-d49d426e6d80 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: General Service Rates -Rural Residential-Single Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH Annual credit for a load leveler installation after 200 KWH/KW/12 Mo. $0.024/KWH (The homeowner determines his maximum KW demand level that the machine will allow during peak period.) (Closed) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rates-Farm-Rural-Residential-and-Small-Commercial.pdf

297

Data:9f9aa5ca-d162-45b8-995c-8f91a933fd4d | Open Energy Information  

Open Energy Info (EERE)

aa5ca-d162-45b8-995c-8f91a933fd4d aa5ca-d162-45b8-995c-8f91a933fd4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE SL-14 SECURITY LIGHTING SERVICE L11 100 WATT METAL POLE Sector: Lighting Description: SCHEDULE SL-14 SECURITY LIGHTING SERVICE L11 100 WATT METAL POLE AVAILABILITY * Available in all territory served by the Cooperative and subject to the Cooperative's Service Rules and Regulations. APPLICABILITY * Applicable only to outdoor lighting by ballast-operated vapor lamp fixtures and poles conforming to the Cooperative's specifications. Service will be rendered only at locations accessible for maintenance.

298

Data:E23fc561-5331-4e47-b8c8-5baf8666cb94 | Open Energy Information  

Open Energy Info (EERE)

fc561-5331-4e47-b8c8-5baf8666cb94 fc561-5331-4e47-b8c8-5baf8666cb94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Roadway Lighting Service - (overhead service), Schedule II -Ornamental Pole - 400W, HPS (Closed) Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for roadway lighting service where existing facilities have adequate capacity and suitable voltage. Unmetered, automatically controlled, overhead lighting service operating from dusk to dawn. The Company will install, operate and maintain such lighting. Lights will be mounted on an existing service pole or poles and such service will be limited to 120 volt service.

299

Data:2718ee43-3e94-4e5c-b8ef-161e07d2e997 | Open Energy Information  

Open Energy Info (EERE)

ee43-3e94-4e5c-b8ef-161e07d2e997 ee43-3e94-4e5c-b8ef-161e07d2e997 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brunswick Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Renewable Generation Rider RGR - 25 kW - 100 kW Sector: Commercial Description: Service under this schedule is available to customers who have an Eligible Qualifying Facility interconnected directly with the Cooperative's system and who have contracted to sell generating capacity and energy to the Cooperative. The maximum size of a generator interconnected to the Cooperative's system will be limited by the impact the generator will have on the Cooperative's system based upon its location on the system and the results of an Engineering Study commissioned by the Cooperative and paid for by the customer. In order to be considered an Eligible Qualifying Facility the generator must be hydroelectric or fueled by trash or methane derived from landfills, hog waste, poultry waste, non-animal biomass, solar, or wind and meet the definition of a Qualifying Facility as defined by the Federal Energy Regulatory Commission's (FERC) Order No. 70 under Docket RM79-54.

300

Data:763706c9-3f99-4b8f-ba0d-04c29cefedd4 | Open Energy Information  

Open Energy Info (EERE)

3f99-4b8f-ba0d-04c29cefedd4 3f99-4b8f-ba0d-04c29cefedd4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/03/01 End date if known: Rate name: Three Phase Small Commercial Sector: Commercial Description: Service under this schedule is applicable to electric service to a member at one point of delivery measured through one meter. This schedule is applicable to members with monthly demands less than 30 kilowatts (kW) for the prior 12-month period which includes and ends with the current billing period. The Monthly Charge is the sum of the Customer Service, Local Access, Transmission, Power Charges, and the Bonneville Power Administration (BPA) Power Cost Adjustment at the following rates.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:7ccd76d7-529f-4d09-b783-dabd8081f9b8 | Open Energy Information  

Open Energy Info (EERE)

ccd76d7-529f-4d09-b783-dabd8081f9b8 ccd76d7-529f-4d09-b783-dabd8081f9b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 3 of Mason County Effective date: 2012/05/01 End date if known: Rate name: OH 200 Watt HPS (19,800 Lumen) Lamp Sector: Lighting Description: Source or reference: http://www.masonpud3.org/rates/outdoorLights.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

302

Data:79d23fdd-dd13-48b8-8a88-e01c17a02cbc | Open Energy Information  

Open Energy Info (EERE)

fdd-dd13-48b8-8a88-e01c17a02cbc fdd-dd13-48b8-8a88-e01c17a02cbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

303

Data:D40643cb-49ea-4bd5-8768-0b8a562b936c | Open Energy Information  

Open Energy Info (EERE)

cb-49ea-4bd5-8768-0b8a562b936c cb-49ea-4bd5-8768-0b8a562b936c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 400 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

304

Data:Cc8f8195-40ae-47b8-b515-2acc30fddbc2 | Open Energy Information  

Open Energy Info (EERE)

95-40ae-47b8-b515-2acc30fddbc2 95-40ae-47b8-b515-2acc30fddbc2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

305

Data:6500909e-4851-4a74-8203-57e77d96c6b8 | Open Energy Information  

Open Energy Info (EERE)

9e-4851-4a74-8203-57e77d96c6b8 9e-4851-4a74-8203-57e77d96c6b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Large Power 3,000 kW and over (1000 kW - 2999 kW) Sector: Industrial Description: Available to all commercial and industrial consumers for lighting and/or heating or/or power, and who are served directly from a distribution substation of 3000 kW capacity or above. Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

306

Data:A64673dd-7f21-431b-a14b-b8e5cddc74f4 | Open Energy Information  

Open Energy Info (EERE)

4673dd-7f21-431b-a14b-b8e5cddc74f4 4673dd-7f21-431b-a14b-b8e5cddc74f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Los Alamos County Effective date: 2011/02/23 End date if known: Rate name: Area Lighting Service - Metered Large Public School Sector: Lighting Description: Source or reference: http://www.losalamosnm.us/utilities/DPUDocuments/DPU_MIS_UtilityRateSheet.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

307

Data:58c791cf-e1ba-44b8-b5c8-b55d13267846 | Open Energy Information  

Open Energy Info (EERE)

c791cf-e1ba-44b8-b5c8-b55d13267846 c791cf-e1ba-44b8-b5c8-b55d13267846 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Large Power service-Secondary-Time of use(S-T) Sector: Industrial Description: This rate is available, by written contract only, to any industrial, commercial or general customer whose service is taken at secondary voltage and whose maximum demand is 500 kilowatts or more during any one of the five consecutive months from November through March. Service will be three phase, sixty hertz, alternating current, supplied from a distribution line and delivered at secondary voltage as described in the Company's Standard Requirements

308

Data:Bf813d17-ff99-45fc-b8f8-b058668df4e0 | Open Energy Information  

Open Energy Info (EERE)

Bf813d17-ff99-45fc-b8f8-b058668df4e0 Bf813d17-ff99-45fc-b8f8-b058668df4e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE G-1 FARM SINGLE PHASE Sector: Commercial Description: This rate schedule is applicable to all electric service required by the Customer for lighting, power and any other purpose on the farm including residential, but not other residential service, where the Customer's maximum metered demand is less than 20.0 kW. Source or reference: http://www.concordma.gov/pages/ConcordMA_LightPlant/CMLP_new_rates

309

Data:50daaad8-774d-4e41-a8b8-029cbc1c26cb | Open Energy Information  

Open Energy Info (EERE)

daaad8-774d-4e41-a8b8-029cbc1c26cb daaad8-774d-4e41-a8b8-029cbc1c26cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oncor Electric Delivery Company LLC Effective date: 2012/07/01 End date if known: Rate name: Rate XFMR - Wholesale Substation Service Sector: Industrial Description: Applicable, to all WDSCs for transformation of electric power and energy from one of Company's standard transmission voltages to one of Company's standard voltages below 60 kV, for delivery of electric power and energy from Generation Facilities to WDSCs. This rate schedule is not applicable to service offered by the Company under another rate schedule. WDSCs taking service under this rate schedule are not subject to Rate DLS.

310

Data:191f4dda-bf90-41f4-b8a2-c7fe89ac1f15 | Open Energy Information  

Open Energy Info (EERE)

bf90-41f4-b8a2-c7fe89ac1f15 bf90-41f4-b8a2-c7fe89ac1f15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

311

Data:55ca673e-8fba-4fc2-b8ec-108c9b3c0571 | Open Energy Information  

Open Energy Info (EERE)

ca673e-8fba-4fc2-b8ec-108c9b3c0571 ca673e-8fba-4fc2-b8ec-108c9b3c0571 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2011/04/01 End date if known: Rate name: Rate Schedule A-Tod-Grain Drying (General Purpose-Single Purpose) Sector: Commercial Description: Available to cooperative members for Grain Drying requiring single phase electric service and monthly demand less than one hundred kilowatts. The minimum monthly rate shall be $37.00 where KVA transformer capacity or less is required. For members requiring more than 15KVA transformer capacity, the minimum rate shall be increased $1.00 for each KVA or fraction above 15KVA.

312

Data:9030dc9b-29a9-461b-b8c0-cf2d599b7c1c | Open Energy Information  

Open Energy Info (EERE)

b-29a9-461b-b8c0-cf2d599b7c1c b-29a9-461b-b8c0-cf2d599b7c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Calhoun, Georgia (Utility Company) Effective date: 2006/07/01 End date if known: Rate name: Security Lights 400 W Utility Type Sector: Lighting Description: Initial charge if a pole must be set for the security light only $150.00. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

313

Data:22f8016f-1bc8-4b5e-b8e5-b484f30ef157 | Open Energy Information  

Open Energy Info (EERE)

16f-1bc8-4b5e-b8e5-b484f30ef157 16f-1bc8-4b5e-b8e5-b484f30ef157 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 150 Watt (Enclosed) (Customer owned w/ maintanence) 69 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

314

Data:4fdf41f8-b072-4afb-b8b1-8d4d1a722eff | Open Energy Information  

Open Energy Info (EERE)

1f8-b072-4afb-b8b1-8d4d1a722eff 1f8-b072-4afb-b8b1-8d4d1a722eff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Emerson, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 250 watt High Pressure Sodium Sector: Lighting Description: All customers are eligible to lease private lighting owned and maintained by NeNPPD. This leased lighting is unmetered and NeNPPD provides all of the energy required. See other side for private lighting service agreement Source or reference: http://nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW)

315

Data:2258c4f8-33fe-416b-8e0b-bd5258766fc7 | Open Energy Information  

Open Energy Info (EERE)

f8-33fe-416b-8e0b-bd5258766fc7 f8-33fe-416b-8e0b-bd5258766fc7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brunswick Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Renewable Generation Rider RGR - Over 500kW Sector: Commercial Description: Service under this schedule is available to customers who have an Eligible Qualifying Facility interconnected directly with the Cooperative's system and who have contracted to sell generating capacity and energy to the Cooperative. The maximum size of a generator interconnected to the Cooperative's system will be limited by the impact the generator will have on the Cooperative's system based upon its location on the system and the results of an Engineering Study commissioned by the Cooperative and paid for by the customer. In order to be considered an Eligible Qualifying Facility the generator must be hydroelectric or fueled by trash or methane derived from landfills, hog waste, poultry waste, non-animal biomass, solar, or wind and meet the definition of a Qualifying Facility as defined by the Federal Energy Regulatory Commission's (FERC) Order No. 70 under Docket RM79-54.

316

Data:55417a91-67d2-458b-8d61-29fbe5a8984b | Open Energy Information  

Open Energy Info (EERE)

5417a91-67d2-458b-8d61-29fbe5a8984b 5417a91-67d2-458b-8d61-29fbe5a8984b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Security Lighting: 35 Watt LP on Existing Pole Sector: Lighting Description: Applies only to lights presently installed. No additional 35 Watt LP will be installed. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

317

Data:Aabe101f-75b2-44b1-b8a5-d64ae93afc3a | Open Energy Information  

Open Energy Info (EERE)

Aabe101f-75b2-44b1-b8a5-d64ae93afc3a Aabe101f-75b2-44b1-b8a5-d64ae93afc3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule FL Flat Rate Service-In Excess of 50% Load Factor 401 - 600 Watt Sector: Commercial Description: Applicability This Schedule is applicable to small, constant, non-metered incidental loads for utilities, communication agencies, state agencies, and applicable special districts where the customer owns and maintains the equipment. The customer must supply equipment wattage to the District. Such loads would include: Cathodic Protection Stations Motor Radial Gates Pressure Point Automatic Watering Systems Flashing Beacons Sign Illumination Communication Power Booster Devices Monthly Usage: 329kWh

318

Data:7489ad60-5b9e-4b8f-80c6-04b434f7dfd3 | Open Energy Information  

Open Energy Info (EERE)

0-5b9e-4b8f-80c6-04b434f7dfd3 0-5b9e-4b8f-80c6-04b434f7dfd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: Schedule "IM-7" Sector: Residential Description: Applicable to irrigation consumers requiring three-phase, both interruptible and non-interruptible service to irrigation pumps and pivot motors. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

319

Data:16cc1788-21d0-4a0b-8df1-4c91f66fb14a | Open Energy Information  

Open Energy Info (EERE)

-21d0-4a0b-8df1-4c91f66fb14a -21d0-4a0b-8df1-4c91f66fb14a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2009/09/30 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

320

Data:1eb9afe6-cb8c-4b8a-9e9b-d0b6ffc97efa | Open Energy Information  

Open Energy Info (EERE)

afe6-cb8c-4b8a-9e9b-d0b6ffc97efa afe6-cb8c-4b8a-9e9b-d0b6ffc97efa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: General Service - Unmetered Sector: Commercial Description: To general service Customers with fixed loads with fixed periods of operation, including but not limited to traffic signals and cable television amplifiers, which are unmetered for the convenience and mutual benefit of the Customer and the PUD. BPA Power Cost Adjustment All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule. Term of Agreement

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:E1b3b62a-d62b-494b-8f67-012b8385c77b | Open Energy Information  

Open Energy Info (EERE)

b3b62a-d62b-494b-8f67-012b8385c77b b3b62a-d62b-494b-8f67-012b8385c77b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2009/07/01 End date if known: Rate name: SMALL MIXED AGRICULTURAL USE - RURAL Sector: Commercial Description: Applicable to all agriculture related production facilities receiving service from the Lincoln County Power District No. 1's existing facilities, and which are located within the Rural System. Service shall be provided at the primary distribution voltage level on the secondary side of a Lincoln County Power District No. 1 substation. The Customer interconnected load must be less than 500 kVA. Service shall be subject to the established rules and regulations of the Lincoln County Power District No. 1.

322

Data:E471fe65-077f-4bee-b8a8-ae0e946770fe | Open Energy Information  

Open Energy Info (EERE)

fe65-077f-4bee-b8a8-ae0e946770fe fe65-077f-4bee-b8a8-ae0e946770fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light HPS 100 W 40' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

323

Data:Eaea5bc1-71b8-4dbc-8ea4-7233f9166ba2 | Open Energy Information  

Open Energy Info (EERE)

Eaea5bc1-71b8-4dbc-8ea4-7233f9166ba2 Eaea5bc1-71b8-4dbc-8ea4-7233f9166ba2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: Outdoor Lighting Energy: Ballasted Lamps 1000W Sector: Lighting Description: I. AVAILABILITY Service is available to any developer, community association, or governmental authority where 120-volt service exists. The cost of service provides for electricity only from existing Northeastern REMC (Northeastern) facilities. Any investment occasioned by the extension of secondary lines or the installation of a transformer for the sole purpose of this service shall require a contract setting forth the charge for the additional investment.

324

Data:5e892995-7873-4b78-ae5c-6d791b8fbb54 | Open Energy Information  

Open Energy Info (EERE)

5-7873-4b78-ae5c-6d791b8fbb54 5-7873-4b78-ae5c-6d791b8fbb54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2013/01/01 End date if known: Rate name: RATE 21, 22, 23- Residential--Single Phase Sector: Commercial Description: AVAILABLE: In the general area served by the district. Within established subdivisions or trailer courts serving 20 or more services of rural communities served by the District and where other utilities are provided by others and multiple meters can be served from one (1) transformation. APPLICABLE: To single family residences and individually metered apartments for all domestic purposes when all service is supplied through a single meter provided ratings of individual single phase motors do not exceed five (5) horsepower.

325

Data:8d6f4169-95c5-43e5-b8b7-aceae703e27b | Open Energy Information  

Open Energy Info (EERE)

f4169-95c5-43e5-b8b7-aceae703e27b f4169-95c5-43e5-b8b7-aceae703e27b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Groton, South Dakota (Utility Company) Effective date: End date if known: Rate name: Schedule M - Heat Storage Unit Payback Sector: Commercial Description: Minimum Bill $25 All kwh on HSU meters at $0.01 plus Schedule B Source or reference: http://city.grotonsd.gov/electric.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

326

Data:A5535ac7-c9b8-4f3f-8f1b-2b9434911fec | Open Energy Information  

Open Energy Info (EERE)

35ac7-c9b8-4f3f-8f1b-2b9434911fec 35ac7-c9b8-4f3f-8f1b-2b9434911fec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/01/01 End date if known: Rate name: General Service, 400 Amp Service or less Sector: Commercial Description: To commercial and general service Customers not subject to other specific rate schedules, and whose service entrance requirements are single-phase, 400 amps or less or three-phase, 200 amps or less. Minimum Monthly Charge The Customer Charge shall be the minimum charge, except that a higher minimum may be specified in accordance with the PUD's line extension policy or credit and collection policy. BPA Power Cost Adjustment

327

Data:Fcf9b74e-611f-41b8-8dd8-2ca51ef75828 | Open Energy Information  

Open Energy Info (EERE)

Fcf9b74e-611f-41b8-8dd8-2ca51ef75828 Fcf9b74e-611f-41b8-8dd8-2ca51ef75828 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Area Lighting Customer Lease 100W HPS Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

328

Data:4eee2bd3-386d-4e0e-8638-a2229b8a53d7 | Open Energy Information  

Open Energy Info (EERE)

eee2bd3-386d-4e0e-8638-a2229b8a53d7 eee2bd3-386d-4e0e-8638-a2229b8a53d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate NSP - Private Outdoor Lighting for Non-Standard Units - 2,500 Lumen Nercury Vapor/Enclosed Refractor - 100 SV Watt Sector: Lighting Description: Applicable to service for outdoor lighting on private property with Company owned overhead lighting fixtures in the Company's entire territory where secondary distribution lines are adjacent to the premise to be served. Not applicable to service for lighting of dedicated or undedicated public thoroughfares.

329

Data:0cccce02-7c6f-40ac-8d42-5c7e374471b8 | Open Energy Information  

Open Energy Info (EERE)

cccce02-7c6f-40ac-8d42-5c7e374471b8 cccce02-7c6f-40ac-8d42-5c7e374471b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Johnson City, Tennessee (Utility Company) Effective date: 2003/10/01 End date if known: Rate name: SECURITY LIGHTS 100 WATT SODIUM VAPOR Sector: Lighting Description: PRESENT RATES FOR SECURITY LIGHTS - EFFECTIVE 10/1/03 - PLUS POLE CHARGE WHERE APPLICABLE Source or reference: http://www.jcpb.com/yourBusiness/meters/rates.asp#rateSheet Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

330

Data:8dd3c34b-8d97-4977-beda-3b69b0a2662c | Open Energy Information  

Open Energy Info (EERE)

b-8d97-4977-beda-3b69b0a2662c b-8d97-4977-beda-3b69b0a2662c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mazomanie, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0574 per kilowatt-hour.

331

Data:2e59fab0-3b8f-43f0-b7e8-9521b6e3420e | Open Energy Information  

Open Energy Info (EERE)

9fab0-3b8f-43f0-b7e8-9521b6e3420e 9fab0-3b8f-43f0-b7e8-9521b6e3420e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Florida Elec Coop, Inc Effective date: 2011/11/01 End date if known: Rate name: Rate Schedule OL- Outside Lighting (250 W HPS) Sector: Lighting Description: Applicable to all members of the Cooperative for lighting of public or private thoroughfares, parking areas, homes, farms, or businesses. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

332

Data:Ab7282b9-5001-4b8d-b45a-e1566034ddbc | Open Energy Information  

Open Energy Info (EERE)

282b9-5001-4b8d-b45a-e1566034ddbc 282b9-5001-4b8d-b45a-e1566034ddbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: End date if known: Rate name: RATE 5 GENERAL SERVICE OVER 50 KW DEMAND - THREE PHASE(NR) Sector: Commercial Description: Applicable to commercial and industrial consumers for all uses including lighting, heating and power, subject to the established rules and regulations of the cooperative. Approval of the cooperative must be obtained prior to installation of any motor requiring starting current in excess of 260 amperes. Source or reference: http://www.cornbeltenergy.com/images/pdfs/701-05%20northern%20rate%205%20effective%2004-07.pdf

333

Data:5b42f6b8-ae8d-4d10-9351-b95241946836 | Open Energy Information  

Open Energy Info (EERE)

f6b8-ae8d-4d10-9351-b95241946836 f6b8-ae8d-4d10-9351-b95241946836 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Western Massachusetts Elec Co Effective date: 2013/06/01 End date if known: Rate name: R-2 Residential Discount Rate (Non-heating) Sector: Residential Description: This rate is applicable to low-income residential customers based upon verification of a Customer's receipt of any means-tested public-benefit program or verification of eligibility for the low-income home energy assistance program (LIHEAP) or its successor program, for which eligibility does not exceed 60% of the state median income or other criteria approved by the Department. Eligibility for the low-income discount rate shall be indexed to changes in the federal poverty level percentage income-criterion, and households satisfying that criterion shall qualify for this rate.

334

Data:A477b8f8-6c93-40f2-9859-e2189242ab97 | Open Energy Information  

Open Energy Info (EERE)

b8f8-6c93-40f2-9859-e2189242ab97 b8f8-6c93-40f2-9859-e2189242ab97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Industrial General Service Transmission Rate-Off Peak Sector: Industrial Description: *This rate is available for lighting and power for those consumers establishing a minimum of 1,000 KW demand. character of service:Standard transmission service voltages as provided in rules and regulations, Alternating Current 60 Hertz (cycles per second). Distribution and ancillary charges:All kilowatts of billing demand per month - $0.98/KW. Added to demand charge.

335

Data:3a418284-b8d5-4932-a37c-2e5b21e37454 | Open Energy Information  

Open Energy Info (EERE)

284-b8d5-4932-a37c-2e5b21e37454 284-b8d5-4932-a37c-2e5b21e37454 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: Small Commercial Service Single Phase Sector: Commercial Description: Availability - This schedule is available for electric service used by a small commercial consumer, in all territory served by the Cooperative, who take service at one delivery point through one kilowatt-hour meter, and whose demand does not exceed 50 kW. Consumer's currently served under this schedule, with demands that have increased above 50 kW, will have the option of remaining on this schedule, up until such time the consumer's maximum demand either exceeds 65 kW, or exceeds 55 kW for more than two of the previous 12 months. At such

336

Data:1b50cdb5-cc53-4b8a-811f-01d8a24b86f5 | Open Energy Information  

Open Energy Info (EERE)

cdb5-cc53-4b8a-811f-01d8a24b86f5 cdb5-cc53-4b8a-811f-01d8a24b86f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: OUTDOOR LIGHTING SERVICE(250-watt Sodium Vapor Directional Unit)(DL) Sector: Lighting Description: This rate schedule is available to all member/owners for dusk-to-dawn outdoor lighting in close proximity to existing overhead secondary circuits. Source or reference: http://eiec.org/wp-content/uploads/2013/04/EIEC_Rate_OL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

337

Data:7158c02d-c0b8-43c9-9e07-403564cc99ee | Open Energy Information  

Open Energy Info (EERE)

c02d-c0b8-43c9-9e07-403564cc99ee c02d-c0b8-43c9-9e07-403564cc99ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: Additional charges-Extension of Secondary Circuit and Wood Pole 30 Sector: Commercial Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

338

Data:D3b8c1bc-870c-4f92-a8fa-9b574a716106 | Open Energy Information  

Open Energy Info (EERE)

b8c1bc-870c-4f92-a8fa-9b574a716106 b8c1bc-870c-4f92-a8fa-9b574a716106 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-1 Small Power Service between 75kW and 200kW Demand Transformer Ownership Discount with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

339

Data:0724d5a4-b1bf-496c-a736-5b8bab1e1f5d | Open Energy Information  

Open Energy Info (EERE)

-b1bf-496c-a736-5b8bab1e1f5d -b1bf-496c-a736-5b8bab1e1f5d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 Small Power Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

340

Data:6b7297b8-9f65-4f29-9d74-cae283c28d1c | Open Energy Information  

Open Energy Info (EERE)

97b8-9f65-4f29-9d74-cae283c28d1c 97b8-9f65-4f29-9d74-cae283c28d1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Groton Dept of Utilities Effective date: 2008/10/01 End date if known: Rate name: Street and Area Lighting Service(92 W Incandescent) Sector: Commercial Description: pplicable to public or private customers for standard street and area lighting installations provided and maintained by the Department to render 4,000 annual hours of lighting. Overhead installation is a light fixture attached to an existing overhead distribution system pole. Underground installation is a light fixture attached to a new pole served from an existing underground distribution system.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:B57ff727-3c99-489b-9074-4d39af5b8f03 | Open Energy Information  

Open Energy Info (EERE)

7ff727-3c99-489b-9074-4d39af5b8f03 7ff727-3c99-489b-9074-4d39af5b8f03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: French Broad Elec Member Corp Effective date: 2009/04/01 End date if known: Rate name: Large Power Customer Sector: Industrial Description: Tiered Demand Charges Tiered Energy Charge w/ different rates >400 hours @ $0.0.394 and >475 hours @ $0.0394 Basic Facilities Charge $30.00 per month NC Renewable Energy Recovery Fee $4.50 per month NC Energy Efficiency Rider $3.96 per month Total $38.46 per month Source or reference: http://www.frenchbroademc.com/rateschedule.cfm

342

Data:1358397b-8b1f-4238-8c96-4a6620c76882 | Open Energy Information  

Open Energy Info (EERE)

b-8b1f-4238-8c96-4a6620c76882 b-8b1f-4238-8c96-4a6620c76882 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: WALNUT STREET LIGHTING: 100 Watt High Pressure Sodium Light Sector: Lighting Description: AVAILABILITY This schedule is applicable to outdoor lighting service along public thoroughfares and in public parks in the City of Walnut. The Cooperative will install, own, operate and maintain the complete lighting system. Lighting will be provided from dusk to dawn. Not applicable to flood lighting installations; private street, roadway or yard lighting installations for individual customers; or to lighting for athletic fields, swimming pools, parking lots, or other similar projects.

343

Data:11a6cb44-2fed-43b8-9c5a-78147a0a8c1d | Open Energy Information  

Open Energy Info (EERE)

1a6cb44-2fed-43b8-9c5a-78147a0a8c1d 1a6cb44-2fed-43b8-9c5a-78147a0a8c1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: SC 69 TOD Sector: Industrial Description: New York City Customers Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

344

Data:Ec231b8d-e17d-4beb-8944-91e654e58bee | Open Energy Information  

Open Energy Info (EERE)

b8d-e17d-4beb-8944-91e654e58bee b8d-e17d-4beb-8944-91e654e58bee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (HPS 1,000w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

345

Data:4ac8f866-717f-466b-8aa6-da7e2e4a9f1d | Open Energy Information  

Open Energy Info (EERE)

6-717f-466b-8aa6-da7e2e4a9f1d 6-717f-466b-8aa6-da7e2e4a9f1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Monthly Farm Residential and Commercial Single-Phase Rural Service A(2) with heat Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

346

Data:Be3e53f1-8a39-4963-bec8-407b92cc9b8b | Open Energy Information  

Open Energy Info (EERE)

e53f1-8a39-4963-bec8-407b92cc9b8b e53f1-8a39-4963-bec8-407b92cc9b8b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Colorado Power Assn Effective date: 2012/01/01 End date if known: Rate name: Yard Lighting: Fluomeric, Quartz or High Pressure Sodium: 250 Watt Lamp Sector: Lighting Description: One 250 Watt Lamp ( 90 kwh/mo.) Source or reference: http://secpa.com/sites/rate-schedules.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

347

Data:72fc1bad-2745-48b8-858b-41a994c598a1 | Open Energy Information  

Open Energy Info (EERE)

bad-2745-48b8-858b-41a994c598a1 bad-2745-48b8-858b-41a994c598a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2006/06/15 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

348

Data:D8b7a544-b8ff-4b65-aaad-9d824a04cc5f | Open Energy Information  

Open Energy Info (EERE)

a544-b8ff-4b65-aaad-9d824a04cc5f a544-b8ff-4b65-aaad-9d824a04cc5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 150 watt HPS - Post Top Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

349

Data:Df1c3bb9-776a-49b8-95ef-7eb3fe7e955c | Open Energy Information  

Open Energy Info (EERE)

bb9-776a-49b8-95ef-7eb3fe7e955c bb9-776a-49b8-95ef-7eb3fe7e955c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

350

Data:A6a5453f-0b8f-4cd6-87d8-e9253aab8d9c | Open Energy Information  

Open Energy Info (EERE)

453f-0b8f-4cd6-87d8-e9253aab8d9c 453f-0b8f-4cd6-87d8-e9253aab8d9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Blue Earth, Minnesota (Utility Company) Effective date: End date if known: Rate name: Security Light: 175w Sector: Lighting Description: Source or reference: http://www.belw.org/Rate Source Parent: Comments cost is per fixture per month Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

351

Data:085226ec-89a6-4d75-b30b-8b14445570c4 | Open Energy Information  

Open Energy Info (EERE)

89a6-4d75-b30b-8b14445570c4 89a6-4d75-b30b-8b14445570c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand 7am-9pm Primary Metering Discount with Parallel Genration(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour.

352

Data:32f502aa-c18c-4371-b8cf-69cd2e833648 | Open Energy Information  

Open Energy Info (EERE)

aa-c18c-4371-b8cf-69cd2e833648 aa-c18c-4371-b8cf-69cd2e833648 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

353

Data:82479f0e-33f0-4ce2-bf6f-8b8e11f47d39 | Open Energy Information  

Open Energy Info (EERE)

f0e-33f0-4ce2-bf6f-8b8e11f47d39 f0e-33f0-4ce2-bf6f-8b8e11f47d39 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule FL Flat Rate Service-Not Exceeding 50% Load Factor 0 - 200 Watt Sector: Commercial Description: Applicability This Schedule is applicable to small, constant, non-metered incidental loads for utilities, communication agencies, state agencies, and applicable special districts where the customer owns and maintains the equipment. The customer must supply equipment wattage to the District. Such loads would include: Cathodic Protection Stations Motor Radial Gates Pressure Point Automatic Watering Systems Flashing Beacons Sign Illumination Communication Power Booster Devices Monthly Usage: 26kWh

354

Data:9c7214ef-4aaf-47b8-b0e0-e68efdc96bae | Open Energy Information  

Open Energy Info (EERE)

214ef-4aaf-47b8-b0e0-e68efdc96bae 214ef-4aaf-47b8-b0e0-e68efdc96bae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2008/06/01 End date if known: Rate name: Residential Services - Farm and Home Sector: Residential Description: Available to Rural Residential (Rate Codes 01, 05, 08), Rural All Electric Residential (Rate Code 03), Town Residential (Rate Codes 21, 25, 28) Town All Electric Residential (Rate Code 23) separately metered Heat Only (Rate Code 29). This rate is for "residential use" for consumers served under a single meter. "Residential use" means electric use that is exclusively for domestic purposes (living spaces) but whose use may include service to water pumps, garages, barns or minor outbuildings provided they are served under the same domestic meter. Service under this tariff is subject to the established tariffs, rules and regulations of Holy Cross.

355

Data:E859ab3d-ee6a-41b7-a250-3224b8dbb211 | Open Energy Information  

Open Energy Info (EERE)

ab3d-ee6a-41b7-a250-3224b8dbb211 ab3d-ee6a-41b7-a250-3224b8dbb211 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: Residential & Farm Rate - RS - ETS Energy Charge Sector: Residential Description: Availability Available as an optional rate to any residential or farm consumer of the Corporation with an existing electric thermal storage or storage water heating system as of June 1, 2010 that can operate exclusively off-peak between the hours of 11:00 p.m. and 7:00 a.m. EST daily. Such loads will be metered separately from the normal electrical load requirements of the consumers. Type of Service Single-phase sixty (60) cycles at 120/240 secondary voltage.

356

Data:026da1a3-303f-4fd8-b68a-0b88b8e590de | Open Energy Information  

Open Energy Info (EERE)

da1a3-303f-4fd8-b68a-0b88b8e590de da1a3-303f-4fd8-b68a-0b88b8e590de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Rural Electric Coop Inc Effective date: 2012/10/01 End date if known: Rate name: Dual Fuel Block Discount Sector: Residential Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

357

Data:722c59f6-488f-409e-85ef-8742c4f028b8 | Open Energy Information  

Open Energy Info (EERE)

c59f6-488f-409e-85ef-8742c4f028b8 c59f6-488f-409e-85ef-8742c4f028b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Area Lighting Schedule - Metal Halide 500w Cobra Head Sector: Lighting Description: Source or reference: www.newbern-nc.org/Elec/ElectricRates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

358

Data:9056761c-4282-4739-a3a3-3af8b06f52b8 | Open Energy Information  

Open Energy Info (EERE)

761c-4282-4739-a3a3-3af8b06f52b8 761c-4282-4739-a3a3-3af8b06f52b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Roadway Lighting Service - (underground service), Schedule IV -Ornamental Pole - 175W, MV (Closed) Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for roadway lighting service where existing facilities have adequate capacity and suitable voltage. Unmetered, automatically controlled, overhead lighting service operating from dusk to dawn. The Company will install, operate and maintain such lighting. Lights will be mounted on an existing service pole or poles and such service will be limited to 120 volt service.

359

Data:9b704daf-15f3-458e-9627-1b8b797b5fcf | Open Energy Information  

Open Energy Info (EERE)

4daf-15f3-458e-9627-1b8b797b5fcf 4daf-15f3-458e-9627-1b8b797b5fcf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Overhead Service HPS 400 W FL Pole Contribution Paid Sector: Lighting Description: Pole Contributions Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Source or reference: https://www.cobbemc.com/~/media/Files/CEMC/PDFs/2012%20PDF/233%20Lighting%20Rates%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

360

Data:Ff96b170-68b8-4c17-91fb-374a14958bb7 | Open Energy Information  

Open Energy Info (EERE)

b170-68b8-4c17-91fb-374a14958bb7 b170-68b8-4c17-91fb-374a14958bb7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS High Density Three Phase LT Sector: Industrial Description: Available for service to locations in a High Density area. A High Density area is defined as:  An enlargement (generally 160 acres) with 20 or more active locations, or  A cluster of 20 or more active locations, or  A cluster with 10 or more active locations that adjoins an enlargement with 20 or more active locations, or  An area adjacent to an incorporated town with 20 or more active locations. Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March)

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:37462ed8-915f-4321-ae69-9db7e6d6b8c5 | Open Energy Information  

Open Energy Info (EERE)

2ed8-915f-4321-ae69-9db7e6d6b8c5 2ed8-915f-4321-ae69-9db7e6d6b8c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dickson, Tennessee (Utility Company) Effective date: 2013/08/01 End date if known: Rate name: Seasonal Demand and Energy Manufacturing Service Rate (SMSB) Greater than 5,000 kW Sector: Commercial Description: Source or reference: http://des.dmcsdev.com/Portals/des/Documents/Rates/August%202013%20-%20Summary.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

362

Data:Bb610caf-fef5-46b8-80df-bf3ec1ddba26 | Open Energy Information  

Open Energy Info (EERE)

Bb610caf-fef5-46b8-80df-bf3ec1ddba26 Bb610caf-fef5-46b8-80df-bf3ec1ddba26 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2009/01/22 End date if known: Rate name: Cp-2 Large Power Service between 100kW and 500kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0510 per kilowatt-hour.

363

Data:93c8eeee-b8b4-48f2-939b-c0d343e365da | Open Energy Information  

Open Energy Info (EERE)

eeee-b8b4-48f2-939b-c0d343e365da eeee-b8b4-48f2-939b-c0d343e365da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Coop Inc Effective date: 2010/10/01 End date if known: Rate name: SECURITY LIGHTING HPS 100 Watt- Wood Pole Sector: Lighting Description: Applicable to all consumers for dusk to dawn outdoor lighting where service is available under existing line extension policies. Source or reference: http://www.cec-co.com/custserv/energy_info/rates/sch_d.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

364

Data:F050d0af-f876-437b-b8dc-ee3b6432c300 | Open Energy Information  

Open Energy Info (EERE)

0d0af-f876-437b-b8dc-ee3b6432c300 0d0af-f876-437b-b8dc-ee3b6432c300 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pataula Electric Member Corp Effective date: 1999/01/01 End date if known: Rate name: Schedule DGS - Distribution Generation Service, Multi Phase Sector: Commercial Description: Applicable to commercial consumers for all electric service including lighting, heating, and power of one standard secondary voltage required on consumers premises, delivered at on point and metered at or compensated to that voltage. For the service to qualify, it must be equipped with permanently connected stand-by generators(s) each having total rated capacity of at least 25 kW, and the consumer must execute and abide by the Cooperative's standard General Service Rate Schedule. The capacity of individual motors served under this schedule shall not exceed 10 horsepower.

365

Data:B8243a0f-d6b8-4171-ba0f-dafd77ad6ada | Open Energy Information  

Open Energy Info (EERE)

43a0f-d6b8-4171-ba0f-dafd77ad6ada 43a0f-d6b8-4171-ba0f-dafd77ad6ada No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: LARGE GENERAL SERVICE - TIME OF DAY Secondary Shoulder Sector: Commercial Description: Facilities Charge per Month per annual max. kW (minimum 80 kW per Month) Less than 1000 kW: $0.33/kW Greater than or equal to 1000 kW: $0.24/kW RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. CC APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers with a measured Demand of at least 80 kW within the most recent 12 months.

366

Data:680755b8-1425-41b6-9e73-f60d5aeeb2ce | Open Energy Information  

Open Energy Info (EERE)

5b8-1425-41b6-9e73-f60d5aeeb2ce 5b8-1425-41b6-9e73-f60d5aeeb2ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2011/08/12 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Ornamental 175 W MV Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

367

Data:B104a958-fbc5-4294-a23b-8cb2ccf0c8ac | Open Energy Information  

Open Energy Info (EERE)

58-fbc5-4294-a23b-8cb2ccf0c8ac 58-fbc5-4294-a23b-8cb2ccf0c8ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS w/deluxe pole Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

368

Data:Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f | Open Energy Information  

Open Energy Info (EERE)

Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f Fce0e4c5-b1fe-4397-94b8-d9d95d17c39f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: High Load Factor - Primary Direct Sector: Industrial Description: Availability Available to any customer contracting for a specified capacity of not less than 25 kW. Applicant must be located adjacent to an electric transmission or distribution line of Company that is adequate and suitable for supplying the service requested. Character of Service Alternating current having a frequency of sixty Hertz and furnished in accordance with the provisions set forth hereunder.

369

Data:1b171703-7b28-4c7b-8bdc-90b5d8f0d08e | Open Energy Information  

Open Energy Info (EERE)

3-7b28-4c7b-8bdc-90b5d8f0d08e 3-7b28-4c7b-8bdc-90b5d8f0d08e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2012/04/01 End date if known: Rate name: General Service Sector: Commercial Description: Prices reflect the Wholesale Power Cost Adjustment of $0.00414/kWh. Source or reference: http://www.kec.com/documents/rate_schedule_800_general_service_april_12.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

370

Data:158bc8a4-41b8-4e26-8306-3a1667bb68f3 | Open Energy Information  

Open Energy Info (EERE)

a4-41b8-4e26-8306-3a1667bb68f3 a4-41b8-4e26-8306-3a1667bb68f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Park Lights 1000-Watt Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

371

Data:C6fd4e1e-23b8-4957-ac69-0991f2ba610c | Open Energy Information  

Open Energy Info (EERE)

e1e-23b8-4957-ac69-0991f2ba610c e1e-23b8-4957-ac69-0991f2ba610c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

372

Data:719868b8-39c1-4777-a2e0-df4c57e4c490 | Open Energy Information  

Open Energy Info (EERE)

8b8-39c1-4777-a2e0-df4c57e4c490 8b8-39c1-4777-a2e0-df4c57e4c490 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 120 W IND Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

373

Data:B26faee2-20cc-4ed9-85ce-b8c890d0871c | Open Energy Information  

Open Energy Info (EERE)

faee2-20cc-4ed9-85ce-b8c890d0871c faee2-20cc-4ed9-85ce-b8c890d0871c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: (RATE SCHEDULE 7: PREPAID ADVANTAGE)OPTIONAL SERVICE - SINGLE-PHASE Sector: Commercial Description: This rate is made available in accordance with Regulation 29 - PREPAID ADVANTAGE and is available to member/owners for all uses, subject to established regulations of the Cooperative. Service under this schedule is available to installations requiring 50 kVA or less of transformer capacity and service capacity of 200 amperes or less. This rate provides member/owners with the opportunity to have better control over their electric energy budgets and cash flow by allowing them to purchase electric energy in the amounts they need and when they want to make the purchase.

374

Data:59cccc8b-d91b-43b9-94b8-0aabbf408192 | Open Energy Information  

Open Energy Info (EERE)

cccc8b-d91b-43b9-94b8-0aabbf408192 cccc8b-d91b-43b9-94b8-0aabbf408192 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Poudre Valley R E A, Inc Effective date: 2013/01/01 End date if known: Rate name: 5000PM - Commercial, Large - 5000kW & Above Primary Meter Sector: Commercial Description: Available to all primary metered consumers for commercial and industrial three-phase service, for all uses including lighting, power and heating for loads in excess of 5000 kW metered demand, subject to the established rules and regulations, tariffs, bylaws and Articles of Incorporation of the Association. Service: Three-phase, 60 hertz, at the Association's standard distribution voltages. The minimum monthly charge shall be the highest of the following:

375

Data:Dacb59ec-d652-460b-b8ce-adfaf62a4c07 | Open Energy Information  

Open Energy Info (EERE)

Dacb59ec-d652-460b-b8ce-adfaf62a4c07 Dacb59ec-d652-460b-b8ce-adfaf62a4c07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Rate 0031 (Three Phase)(Schedule City of Waterloo) Sector: Residential Description: This rate is available to those members who are receiving service from the cooperative and whose commercial, industrial and three phase farm service has been annexed into the city limits of Waterloo. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Flat rate buy is the same rate that is charged to Residents of City of Waterloo.

376

Data:F253a237-da91-43e8-b8ca-4a4b06cbccea | Open Energy Information  

Open Energy Info (EERE)

7-da91-43e8-b8ca-4a4b06cbccea 7-da91-43e8-b8ca-4a4b06cbccea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 2 of Grant County Effective date: 2013/01/01 End date if known: Rate name: RATE SCHEDULE No. 2 GENERAL SERVICE Three-phase Sector: Commercial Description: To accounts with loads not exceeding 500 kW (as measured by Billing Demand) for general service lighting, heating and power (excepting irrigation service) requirements. Minimum Charge: $4.05 per kW of Billing Demand, applicable to loads of 100 kW and above, but not less than 50 cents per day for single-phase service or 75 cents per day for three-phase service.

377

Data:6431b6d0-4fce-4b94-ac92-b8e1634e144f | Open Energy Information  

Open Energy Info (EERE)

d0-4fce-4b94-ac92-b8e1634e144f d0-4fce-4b94-ac92-b8e1634e144f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: High Load Factor - TOU - Primary Dedicated Sector: Industrial Description: Availability Available to any Customer whose electric service is provided under Rate HLF - Schedule for High Load Factor Service (Rate HLF), who agrees to participate in the Demand Side Management Program to move load from the on-peak hours to the off-peak hours, and who contracts for Optional Time-Of-Use Service. Energy Delivery Charge Per Month Each kW of Billing Maximum Load Primary Dedicated Delivery $ 3.00 per kW

378

Data:0036004f-e4aa-42b4-86b8-4f652db4de65 | Open Energy Information  

Open Energy Info (EERE)

4f-e4aa-42b4-86b8-4f652db4de65 4f-e4aa-42b4-86b8-4f652db4de65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2013/06/01 End date if known: Rate name: Rate Schedule PSAL - 250 W Cobra-Head Sector: Lighting Description: Source or reference: www.pseg.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

379

Data:506e7491-7a10-4e8b-bf1b-8e28fdee71d1 | Open Energy Information  

Open Energy Info (EERE)

91-7a10-4e8b-bf1b-8e28fdee71d1 91-7a10-4e8b-bf1b-8e28fdee71d1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Continental Divide El Coop Inc Effective date: End date if known: Rate name: STREET LIGHTING (Public)-175 W MV* Sector: Lighting Description: * As of Dec. 31, 1999, new mercury vapor fixtures are no longer available. The rates and adjustments set forth below are based on average billing period consumption, as follows: 100-watt fixture:47 kWh/fixture 175-watt fixture:76 kWh/fixture 250-watt fixture:110 kWh/fixture 400-watt mercury vapor fixture:166 kWh/fixture 400-watt sodium vapor fixture:176 kWh/fixture

380

Data:D56791df-4059-4772-a611-5dcd3b8e203f | Open Energy Information  

Open Energy Info (EERE)

791df-4059-4772-a611-5dcd3b8e203f 791df-4059-4772-a611-5dcd3b8e203f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cobb Electric Membership Corp Effective date: 2006/01/01 End date if known: Rate name: Outdoor Lighting Underground Service HPS 1000 W FL/SB Sector: Lighting Description: Pole Contribution Wood 30' $246.00 Wood 35' $297.00 Wood 40' $382.00 Wood 45' $424.00 Fiberglass with Traditional 20' $490.00 Fiberglass with Acorn 20' $490.00 Fiberglass with Roadway 30' $532.00 Fiberglass with Roadway 35' $569.00 Fiberglass with Roadway 39' $772.00 Fiberglass with Decorative 30' $562.00 Fiberglass with Decorative 35' $596.00

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:997bfb4d-b8af-41a4-9d91-73c32c1471dc | Open Energy Information  

Open Energy Info (EERE)

bfb4d-b8af-41a4-9d91-73c32c1471dc bfb4d-b8af-41a4-9d91-73c32c1471dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gallatin, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Residential Sector: Residential Description: Fuel Cost is determined during the particular season Source or reference: http://www.gallatinelectric.com/gallatin-electric-rates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

382

Data:F6f20154-bb67-464d-a880-8d48aaeb74b8 | Open Energy Information  

Open Energy Info (EERE)

f20154-bb67-464d-a880-8d48aaeb74b8 f20154-bb67-464d-a880-8d48aaeb74b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, Mercury Vapor Flood Light, 1000W (New Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

383

Data:17a25855-bfe1-426e-a563-39cf8a19d7b8 | Open Energy Information  

Open Energy Info (EERE)

855-bfe1-426e-a563-39cf8a19d7b8 855-bfe1-426e-a563-39cf8a19d7b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service Time-of-Day 7am-7pm Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

384

Data:86b33fbf-556e-473f-89dd-3d0037f5b8ec | Open Energy Information  

Open Energy Info (EERE)

3fbf-556e-473f-89dd-3d0037f5b8ec 3fbf-556e-473f-89dd-3d0037f5b8ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of New Glarus, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS (a) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0721 per kilowatt-hour.

385

Data:030e69b6-ae48-443b-8eed-61f3dcc0bf3a | Open Energy Information  

Open Energy Info (EERE)

030e69b6-ae48-443b-8eed-61f3dcc0bf3a 030e69b6-ae48-443b-8eed-61f3dcc0bf3a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: SC 62 Conventional Sector: Residential Description: New York City Customers Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

386

Data:54348949-b8a2-49ca-abb7-f9a4b6a2a526 | Open Energy Information  

Open Energy Info (EERE)

49-b8a2-49ca-abb7-f9a4b6a2a526 49-b8a2-49ca-abb7-f9a4b6a2a526 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Small Power Service TOU Sector: Industrial Description: This rate will be available on an optional basis to customers for all types of service if their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, but not greater than 200 kW per month for three or more months in a consecutive 12-month period. Fixed monthly charge: Customer Charge ($30.00) + Public Benefits Charge ($10.00).

387

Data:48e001b8-1ec4-45fa-b333-31349ce26e7c | Open Energy Information  

Open Energy Info (EERE)

e001b8-1ec4-45fa-b333-31349ce26e7c e001b8-1ec4-45fa-b333-31349ce26e7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2013/01/01 End date if known: Rate name: MUNICIPAL PUMPING WITH DEMAND METER Sector: Description: To electric service supplied to a municipality for the operation of water pumping and sewage disposal facilities, where all such facilities are completely electrified and operated by service of Company, subject to Company's Electric Service Regulations and any applicable Riders. Service shall be delivered at one point from existing facilities of adequate type and capacity and metered at (or compensated to) the voltage of delivery. TYPE OF SERVICE Single phase, three phase or single and three phase, 60 hertz, at one standard low voltage of 120/240 to 4160 volts; except that within the Low Voltage Network Area service shall be three phase, four wire, 60 hertz, 277/480 volts.

388

Data:2c0ace34-abea-465f-a25a-9e7cc8a8b8fe | Open Energy Information  

Open Energy Info (EERE)

ace34-abea-465f-a25a-9e7cc8a8b8fe ace34-abea-465f-a25a-9e7cc8a8b8fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: STREET LIGHTING: HPS Cobrahead Luminaire(400W)(on existing Pole) Sector: Lighting Description: Availability Available to any municipal, government agency, commercial account, or homeowners association for street lighting in and around public parking areas, public roads, and vehicle access roads. Applicant must be adjacent to an existing electric power line of the Corporation that is adequate and suitable for supplying the lighting service. Type of Service Dusk-to-dawn lighting service using photoelectric controlled equipment. All equipment, including fixtures, supporting structures and electrical apparatus shall be owned, installed, and maintained by the Corporation. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required for the extension of secondary service lines or the installation of a transformer, will be billed to the consumer.

389

Data:8b4fedd6-18ba-422e-b0b8-15e2a8d3573e | Open Energy Information  

Open Energy Info (EERE)

fedd6-18ba-422e-b0b8-15e2a8d3573e fedd6-18ba-422e-b0b8-15e2a8d3573e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of River Falls, Wisconsin (Utility Company) Effective date: 2008/04/11 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0662 per kilowatt-hour.

390

Data:9fe584b8-228f-46f3-826e-ce213d7e9d51 | Open Energy Information  

Open Energy Info (EERE)

84b8-228f-46f3-826e-ce213d7e9d51 84b8-228f-46f3-826e-ce213d7e9d51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2013/05/06 End date if known: Rate name: RATE NO. 05-H AGRICULTURAL IRRIGATION PUMPING SERVICE Sector: Industrial Description: Applicability: To all irrigation motors other than those operated by the Maricopa Stanfield Irrigation & Drainage District for the exclusive use of pumping water for the purposes of irrigation farm fields or to fill canals which are ultimately used to irrigate fields. Source or reference: http://www.ed3online.org/view/70

391

Data:76d4da5b-bbc1-4fb8-b18c-46c75698b8b4 | Open Energy Information  

Open Energy Info (EERE)

d4da5b-bbc1-4fb8-b18c-46c75698b8b4 d4da5b-bbc1-4fb8-b18c-46c75698b8b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2010/10/01 End date if known: Rate name: Large Power - Schedule LP Sector: Industrial Description: AVAILABILITY Available to any member of the Kosciusko Rural Electric Membership Corporation (KREMC) with a connected load requiring installed transformer capacity in excess of 50 kVA and having a separate service through a separate meter. See Schedule LP-S for permanently installed irrigation or grain-drying equipment. CHARACTER OF SERVICE Alternating current, 60 hertz, at 120/240 volts, or such other voltage as might be mutually agreed upon..

392

Data:Fe179b12-2107-4417-8b8e-c20fbef46cd6 | Open Energy Information  

Open Energy Info (EERE)

9b12-2107-4417-8b8e-c20fbef46cd6 9b12-2107-4417-8b8e-c20fbef46cd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: SCHEDULE 40-0 LARGE POWER SERVICE (Multi Phase) Sector: Commercial Description: I. AVAILABILITY Service is available to any customer of Northeastern REMC (Northeastern) requiring in excess of fifty kilowatts (50 kW) of metered demand and less than one thousand kilowatts (1,000 kW) of metered demand. Service hereunder is not available as standby power. II. CHARACTER OF SERVICE Service rendered under this rider shall be as specified below: A. SINGLE-PHASE Single-phase service shall be alternating current, sixty (60) hertz, at approximately 120/240 volts, three wire. B. MULTI-PHASE Multi-phase service shall be alternating current, sixty (60) hertz, at approximately 120/208, 120/240, or 277/480 volts, four wire. Other voltages may be available upon the customer's request subject to agreement by Northeastern.

393

Data:A279fb2a-5499-4e80-942d-5b8e11c70363 | Open Energy Information  

Open Energy Info (EERE)

fb2a-5499-4e80-942d-5b8e11c70363 fb2a-5499-4e80-942d-5b8e11c70363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Small Commercial Single Phase Service Sector: Commercial Description: *The minimum monthly charge shall be the base charge plus $1.00 per kVA of installed transformer capacity in excess of 25 kVA. Source or reference: http://www.sawnee.com/documents/rates/SC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

394

Data:Ea6f31e6-89e8-4da8-b8cf-486b92b24137 | Open Energy Information  

Open Energy Info (EERE)

e6-89e8-4da8-b8cf-486b92b24137 e6-89e8-4da8-b8cf-486b92b24137 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

395

Data:C24657f6-b8b6-4575-8ea9-75e13a3e1faa | Open Energy Information  

Open Energy Info (EERE)

4657f6-b8b6-4575-8ea9-75e13a3e1faa 4657f6-b8b6-4575-8ea9-75e13a3e1faa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Small Commercial: S3PO Sector: Commercial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

396

Data:5f4499c1-0a59-499d-aad8-072b8c22ac96 | Open Energy Information  

Open Energy Info (EERE)

c1-0a59-499d-aad8-072b8c22ac96 c1-0a59-499d-aad8-072b8c22ac96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service Time-of-Day 9am-9pm Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

397

Data:C42d8729-45b8-4db7-9783-4be5cce0dfce | Open Energy Information  

Open Energy Info (EERE)

d8729-45b8-4db7-9783-4be5cce0dfce d8729-45b8-4db7-9783-4be5cce0dfce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Ms-1 Street and Athletic Field Lighting Service Overhead 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

398

Data:5c17a1b8-c873-4eee-946e-ed157225ab7d | Open Energy Information  

Open Energy Info (EERE)

a1b8-c873-4eee-946e-ed157225ab7d a1b8-c873-4eee-946e-ed157225ab7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Electric Coop, Inc Effective date: 2009/05/30 End date if known: Rate name: Residential Service-TOU Sector: Residential Description: Available to residential consumers, small schools, churches, and community halls requiring less than 50 KVA of transformer capacity, for all rural and town uses within the utility's New Mexico service area. The capacity of individual motors served under this schedule shall not exceed 10 HP. The system charge covers costs of providing electric service, including operation and maintenance of facilities, consumer accounting expenses and other administrative costs. Purchased Power Cost Adjustment (PPCA)

399

Data:86cf7401-9b8c-4e5c-b5bd-847bc075d6f2 | Open Energy Information  

Open Energy Info (EERE)

401-9b8c-4e5c-b5bd-847bc075d6f2 401-9b8c-4e5c-b5bd-847bc075d6f2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/01/01 End date if known: Rate name: Rental Light Service- Security Lights- (175 W MV with Pole) Sector: Lighting Description: Applicable only to outdoor lighting by ballast operated vapor lamp fixtures, either Mercury Vapor, Pressure Sodium, or Metal Halide. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

400

Data:E9c0221a-8a04-4f3a-96b8-f4b3279ff5db | Open Energy Information  

Open Energy Info (EERE)

a-8a04-4f3a-96b8-f4b3279ff5db a-8a04-4f3a-96b8-f4b3279ff5db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grayson Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule 3- Off Peak Marketing Rate Sector: Residential Description: Available to members of the Cooperative eligible for service under Tariff Schedule I-- Domestic-Farm & Home Service, or Tariff Schedule 2--Commercial and Small Power Less than 50 KVA, who have installed Cooperative approved load management devices for the use of power during off-peak hours. This rate shall only apply to programs which have been expressly approved by the Public Service Commission to be offered under the Marketing Rate of East Kentucky Power Cooperative's Wholesale Rate Schedule A.

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:00ffbd5b-acc8-4dda-9d2f-c04c2b604b8f | Open Energy Information  

Open Energy Info (EERE)

ffbd5b-acc8-4dda-9d2f-c04c2b604b8f ffbd5b-acc8-4dda-9d2f-c04c2b604b8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

402

Data:1d401866-1ff9-4ade-9e33-c0b8f46bee69 | Open Energy Information  

Open Energy Info (EERE)

d401866-1ff9-4ade-9e33-c0b8f46bee69 d401866-1ff9-4ade-9e33-c0b8f46bee69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Primary Industrial: P3PI Sector: Industrial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

403

Data:D70a7ca4-301f-4e89-8a1b-8f07a5509126 | Open Energy Information  

Open Energy Info (EERE)

a7ca4-301f-4e89-8a1b-8f07a5509126 a7ca4-301f-4e89-8a1b-8f07a5509126 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cartersville, Georgia (Utility Company) Effective date: 2005/10/18 End date if known: Rate name: Medium Power Service-Industrial Sector: Industrial Description: Applicable to all commercial or industrial electric service which is delivered or compensated to one standard voltage and where the following criteria are met: 1. Billing demand for the current month and 11 preceeding months must be greater than 100KW and less than 1000KW as defined in the billing demand section of this tariff. 2. In the event that billing demand becomes permanently less than 100kW, the customer may switch to the appropriate tariff following 12 months service on this tariff.

404

Data:D5961165-b8b4-4b15-96e4-9f89874faf43 | Open Energy Information  

Open Energy Info (EERE)

-b8b4-4b15-96e4-9f89874faf43 -b8b4-4b15-96e4-9f89874faf43 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rice Lake Utilities Effective date: 2011/04/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0773 per kilowatt-hour.

405

Data:E29930d5-c810-4cfb-91b8-bf5588821af5 | Open Energy Information  

Open Energy Info (EERE)

0d5-c810-4cfb-91b8-bf5588821af5 0d5-c810-4cfb-91b8-bf5588821af5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule PI Restricted Irrigation Pumping(Off Season) Sector: Industrial Description: Applicability This schedule is applicable and restricted to pumping of ground water for drainage or irrigation for the purpose of Agricultural/Livestock Production within the irrigation service area boundary where such pumping is eligible to be served with electricity sold to the District by the City and County of San Francisco pursuant to Section 9(l) of the federal Raker Act. This schedule is applicable on an annual basis only. On Season: Connected Load Charge, per HP: $ 1.66 Energy Charge per kWh $ 0.0716 Off Season: Energy Charge, per kWh $ 0.1654

406

Data:0a0c34e6-ae65-4bac-83b8-e5d472c06a10 | Open Energy Information  

Open Energy Info (EERE)

c34e6-ae65-4bac-83b8-e5d472c06a10 c34e6-ae65-4bac-83b8-e5d472c06a10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: LGS-AE Sector: Commercial Description: The LGS-AE (All Electric) Rate is available for general service consumers who are electric heating and / or air conditioning. To get on the rate, all heating / air conditioning loads must be recorded by a sub-meter. A credit for this usage is applied to your regular bill. Source or reference: http://www.mwpower.net/sites/mwpower.coopwebbuilder.com/files/genservice_0.pdf

407

Data:43890328-b8f1-466e-8c29-f4b545ee8e29 | Open Energy Information  

Open Energy Info (EERE)

28-b8f1-466e-8c29-f4b545ee8e29 28-b8f1-466e-8c29-f4b545ee8e29 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 3 of Mason County Effective date: 2013/04/01 End date if known: Rate name: Small Commercial: General Service Without Demand Sector: Commercial Description: Source or reference: http://www.masonpud3.org/rates/smallCommercial.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

408

Data:455d7161-b998-4f01-85fd-ab54caaf85b8 | Open Energy Information  

Open Energy Info (EERE)

1-b998-4f01-85fd-ab54caaf85b8 1-b998-4f01-85fd-ab54caaf85b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Private Area Lighting HPS 100 Watt - Antique (Decorative) - Service Option B Sector: Lighting Description: Service Options A. Fixture and Installation Only; B. Maintenance of Fixture Only; C. Energy, Excluding Fuel Charge, for Fixture Only; and D. Full Service: The sum of each of the above Discrete Private Area Lighting Charges (A+B+C), plus the monthly service charge Source or reference: http://www.lakelandelectric.com/Portals/0/docs/pdf/Rates%20&%20Pricing/Electric%20Rates%20Tariffs/html/files/assets/common/downloads/publication.pdf

409

Data:585f8b0e-5424-434e-b8e9-9b8475e9e424 | Open Energy Information  

Open Energy Info (EERE)

f8b0e-5424-434e-b8e9-9b8475e9e424 f8b0e-5424-434e-b8e9-9b8475e9e424 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Gs-1 General Service Three Phase less than 75kW Demand with Parallel Generation(20kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

410

Data:A1aab9f5-62b8-4054-9e89-e8f4799eee09 | Open Energy Information  

Open Energy Info (EERE)

aab9f5-62b8-4054-9e89-e8f4799eee09 aab9f5-62b8-4054-9e89-e8f4799eee09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Ms-1 Street Lighting Service 80 W LED(Utility Owned and Utility Maintained) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

411

Data:Ec14c030-53de-470e-aad1-570669e1b8dd | Open Energy Information  

Open Energy Info (EERE)

4c030-53de-470e-aad1-570669e1b8dd 4c030-53de-470e-aad1-570669e1b8dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting- Ornamental Lighting and Poles (Sodium Vapor Road Cut-Off 150 W) Sector: Lighting Description: GMP shall own, supply and maintain all ornamental lighting and poles, with energy supplied by underground facilities at the rates set forth below. Installation of ornamental poles, luminaries and wires will be paid for by the Customer as a line extension under GMP's line extension tariff and Public Service Board ("PSB") Rule 5.600. The Customer will be required to purchase and install 2" Sch. 40 electrical grade EPVC conduit and install pre-cast concrete bases for mounting the light poles. Customers should contact GMP's engineering department for details and assistance.

412

Data:389b7fdd-9e5d-4bbe-95b8-8753746c1361 | Open Energy Information  

Open Energy Info (EERE)

fdd-9e5d-4bbe-95b8-8753746c1361 fdd-9e5d-4bbe-95b8-8753746c1361 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: GS23 - THREE-PHASE - Two Part Tariff Sector: Commercial Description: * AVAILABILITY This schedule is available to all three-phase consumers whose monthly load requirements do not exceed 500kW. This schedule also applies to all single-phase commercial consumers requiring service on or after May 10, 1993. TYPE OF SERVICE Service under this schedule shall be single-phase commercial or three-phase, 60-hertz, at one of the Cooperative's available voltages. Motors having a rated capacity in excess of ten horsepower must have approved starting equipment.

413

Data:624b23b8-fe68-4a35-be4a-87d1e24f7afc | Open Energy Information  

Open Energy Info (EERE)

24b23b8-fe68-4a35-be4a-87d1e24f7afc 24b23b8-fe68-4a35-be4a-87d1e24f7afc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: RNY-2A (Zone E Blended) Sector: Commercial Description: Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

414

Data:31c1b77e-44ba-4b67-90df-74b8cb599a40 | Open Energy Information  

Open Energy Info (EERE)

e-44ba-4b67-90df-74b8cb599a40 e-44ba-4b67-90df-74b8cb599a40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 250 W HPS Opt. 2 L-1 Sector: Lighting Description: Option 2 is a Utility (SUB) owned and installed fixtures. in addition to charges in Option 2, there is a charge of .333% per month for return on investment (plant original cost). Source or reference: http://www.subutil.com/files/static_page_files/A6CFDCA3-94A4-7DCF-40A67DECC1D04974/201204SUBElec.pdf Source Parent:

415

Data:7261da4b-8aec-4bf4-8c81-e7599dcd5a17 | Open Energy Information  

Open Energy Info (EERE)

1da4b-8aec-4bf4-8c81-e7599dcd5a17 1da4b-8aec-4bf4-8c81-e7599dcd5a17 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: 2009/11/11 End date if known: Rate name: SMALL GENERAL SERVICE SCHEDULE B-3 V2 Sector: Commercial Description: APPLICABILITY Applicable to multi-phase Customers for all uses unless another rate schedule is specifically applicable. The maximum demand to be provided under Schedule B-3 shall be 200 kW. Demand Delivery Charge: First 100 kW of billing demand delivered @ $1.50 per month Over 100 kW of billing demand delivered @ $9.00 per month

416

Data:Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e | Open Energy Information  

Open Energy Info (EERE)

Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e Bd92fc93-1a25-4aee-97d2-fb0c2b8d342e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Residential- Three-Phase Sector: Residential Description: This rate will be applied to residential single-phase or three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. This following Riders and Adjustments are applicable to this rate: Power Cost Adjustment Clause Renewable Energy Rider Commitment to Community Program Rider which sets a fee of 3.0% of the total electric bill, not to exceed $0.87.

417

Data:9927da48-0971-4f1f-8d6b-8d7fd6f2f1f9 | Open Energy Information  

Open Energy Info (EERE)

9927da48-0971-4f1f-8d6b-8d7fd6f2f1f9 9927da48-0971-4f1f-8d6b-8d7fd6f2f1f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Commercial Outdoor Lighting MV 400 W Sector: Lighting Description: Source or reference: http://www.tcec.com/myBusiness/generalSinglePhaseService.aspx Source Parent: http://www.tcec.com Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

418

Data:002cbf14-b8d3-4a51-b6a3-0f62636ad887 | Open Energy Information  

Open Energy Info (EERE)

cbf14-b8d3-4a51-b6a3-0f62636ad887 cbf14-b8d3-4a51-b6a3-0f62636ad887 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Underground Wiring Wood Pole MH 400 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge $275 one time charge for instillation Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

419

Data:5d0b965d-a4cb-440c-b8dc-7fea4c4dc573 | Open Energy Information  

Open Energy Info (EERE)

d-a4cb-440c-b8dc-7fea4c4dc573 d-a4cb-440c-b8dc-7fea4c4dc573 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Suburban Water Heating Energy Rate Commercial Sector: Commercial Description: To any customer for separately metered controlled water heating, subject to such wiring rules and regulations as are established by the utility. For as long as the City has costs associated with the ownership of the power plant, these costs shall be recovered through the following power plant cost adjustment factor:$0.01000 for all kWh, all service classes. State of Michigan P.A. 295, of Public Acts 2008, commonly referred to as the Clean, Renewable and Efficient Energy Act mandates the electric utility collect the following charges from each electric utility customer: Commercial $0.00200/kWh. The sum of these charges is reflected in adjustments to the energy charge.

420

Data:2d57e112-efb2-4b70-bc8b-8fda9ae547fb | Open Energy Information  

Open Energy Info (EERE)

e112-efb2-4b70-bc8b-8fda9ae547fb e112-efb2-4b70-bc8b-8fda9ae547fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp Effective date: 2008/10/01 End date if known: Rate name: Outdoor Lighting HPS Cobra Head 100 W Sector: Lighting Description: Assumes Existing Pole Source or reference: http://www.tri-countyemc.com/skins/userfiles/file/Outdoor_lighting_1_2_3.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:2367240f-bd28-4b73-ae88-b8f1d7ed70c1 | Open Energy Information  

Open Energy Info (EERE)

0f-bd28-4b73-ae88-b8f1d7ed70c1 0f-bd28-4b73-ae88-b8f1d7ed70c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: General Service - Demand Commercial Sector: Commercial Description: * This rate applies to electric service required by any customer to whom no other specific rate applies and whose demand for power meets or exceeds 20 kilowatts for any month within the most recent six summer billing months or as determined by the City of Austin. Demand Adj. = Transmission Service Adj. Rider Flat rate Adj. = Fuel Adj. Factors Source or reference: http://www.austinenergy.com/About%20Us/Rates/Commercial/generalServiceDemand.htm

422

Data:5e9593e0-beb2-4b0b-8e87-71ce5f0daddf | Open Energy Information  

Open Energy Info (EERE)

93e0-beb2-4b0b-8e87-71ce5f0daddf 93e0-beb2-4b0b-8e87-71ce5f0daddf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: General Service Trial Period Optional Time-of-Day w/Mid-Peak Period Sector: Commercial Description: To any general service customer whose metered demand, or any general service customer without a demand meter, whose connected load does not exceed 49 kW, for more than two out of twelve (12) most recent monthly billing periods, including the current billing period. All service hereunder will be supplied at one location through one point of delivery and measured through one meter.

423

Data:42bf6926-efb3-4d66-b8bc-3592dd6040c1 | Open Energy Information  

Open Energy Info (EERE)

926-efb3-4d66-b8bc-3592dd6040c1 926-efb3-4d66-b8bc-3592dd6040c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rice Lake Utilities Effective date: 2011/04/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0773 per kilowatt-hour.

424

Data:7f0301ab-b8f6-442e-bb87-e115ff1332e8 | Open Energy Information  

Open Energy Info (EERE)

01ab-b8f6-442e-bb87-e115ff1332e8 01ab-b8f6-442e-bb87-e115ff1332e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Large General (LG) Rate Demand is less than 25KW- Net Metered Renewable Energy Source Rider Sector: Industrial Description: Service under this rate is supplied for all purposes where energy consumption is 3,000 kWh per month or above (or greater than or equal to 100 kWh per day) for 3 consecutive months out of the last 12 months, or at the request of the customer.

425

Data:6d4bc9cb-70c2-49ab-b9b8-2fe1caa35fcd | Open Energy Information  

Open Energy Info (EERE)

cb-70c2-49ab-b9b8-2fe1caa35fcd cb-70c2-49ab-b9b8-2fe1caa35fcd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Off Peak Water Storage Sector: Description: This rate is applicable for customers who have General Service. Usage under this rate would be tracked by a 2nd meter. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

426

Data:3e1aa64b-8ba0-4d98-804e-fba5ecd908d3 | Open Energy Information  

Open Energy Info (EERE)

aa64b-8ba0-4d98-804e-fba5ecd908d3 aa64b-8ba0-4d98-804e-fba5ecd908d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prairie Land Electric Coop Inc Effective date: 2010/01/14 End date if known: Rate name: Monthly Unmetered Investment Facility(MULT GLOBE 100W HPS-Option A) Sector: Lighting Description: Customer-0% Cooperative-100% Source or reference: http://www.prairielandelectric.com/Rates_PDF/MKEC%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

427

Data:678c01ba-f90d-4e8b-88b8-7fcd5fa1bdb0 | Open Energy Information  

Open Energy Info (EERE)

c01ba-f90d-4e8b-88b8-7fcd5fa1bdb0 c01ba-f90d-4e8b-88b8-7fcd5fa1bdb0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Public Power District Effective date: 2013/01/01 End date if known: Rate name: INTERRUPTIBLE IRRIGATION SERVICE MULTIPLE PLUS SUNDAY Sector: Commercial Description: Available: In the general area served by the District. Applicable To: a) Electric irrigation pumps to provide water for crop irrigation. b) Pumping water for livestock consumption when served from the existing district facilities serving the irrigation pump. c) On-farm related grain processing from the same district facilities serving the irrigation pump, as outlined in section "Charge for Non-irrigation Use" contained in this rate. Not Applicable: a) For electric service to provide drive power for pivot irrigation wheels. b) For irrigation well service where the billing horsepower is less than 10 HP unless the customer pays a contribution in aid of the installation of the load management switch, which shall be determined by the district.

428

Data:Fbe989b6-778b-401f-b8cf-46a38a859bca | Open Energy Information  

Open Energy Info (EERE)

Fbe989b6-778b-401f-b8cf-46a38a859bca Fbe989b6-778b-401f-b8cf-46a38a859bca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Public Power District Effective date: 2013/01/01 End date if known: Rate name: IRRIGATION SERVICE - SINGLE AND MULTIPHASE FULL POWER Sector: Commercial Description: Available: In the general area served by the District from existing distribution facilities. Applicable To: a) Electric irrigation pumps to provide water for crop irrigation. b) Electric service to provide drive power for pivot irrigation wheels. c) Pumping water for livestock consumption when served from the existing district facilities serving the irrigation pump. d) On-farm related grain processing from the same district facilities serving the irrigation pump, or as outlined in section "Charge for Non-irrigation Use" contained in this rate.

429

Data:14350bf6-621c-473b-8de4-fadc9d363d37 | Open Energy Information  

Open Energy Info (EERE)

0bf6-621c-473b-8de4-fadc9d363d37 0bf6-621c-473b-8de4-fadc9d363d37 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2009/06/01 End date if known: Rate name: Residential electric service RES-23 Sector: Residential Description: This rate is applicable to electricity served through a single meter and used for domestic purposes only. Available at all points throughout the territory served by the company where facilities of adequate capacity and suitable phase and voltage are adjacent to the premises to be served, and service is taken according to the service standards and service regulations of the company. Where facilities of adequate capacity and suitable phase and voltage are not adjacent to the premises to be served, company may, at its opinion, require a contribution, higher minimum bill, facilities charge, or other compensation to make service available.

430

Data:8327d08c-e196-4591-90fa-37b8a2f5a9ff | Open Energy Information  

Open Energy Info (EERE)

8c-e196-4591-90fa-37b8a2f5a9ff 8c-e196-4591-90fa-37b8a2f5a9ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Schedule L - 250W HPS Sector: Commercial Description: Source or reference: http://www.nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

431

Data:De5a676f-68ea-4b8e-8d19-a84f9ce7dca7 | Open Energy Information  

Open Energy Info (EERE)

6f-68ea-4b8e-8d19-a84f9ce7dca7 6f-68ea-4b8e-8d19-a84f9ce7dca7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Forest Grove, Oregon (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: GENERAL SERVICE THREE PHASE Sector: Commercial Description: 3 Phase Service Source or reference: http://www.forestgrove-or.gov/city-hall/light-a-power-service-rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

432

Data:0ef80000-b8f0-423e-911e-e535fda153a8 | Open Energy Information  

Open Energy Info (EERE)

ef80000-b8f0-423e-911e-e535fda153a8 ef80000-b8f0-423e-911e-e535fda153a8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: STREET LIGHTING: HPS Cobrahead Luminaire(100W)on 30' Fiberglass or Aluminium Pole Sector: Lighting Description: Availability Available to any municipal, government agency, commercial account, or homeowners association for street lighting in and around public parking areas, public roads, and vehicle access roads. Applicant must be adjacent to an existing electric power line of the Corporation that is adequate and suitable for supplying the lighting service. Type of Service Dusk-to-dawn lighting service using photoelectric controlled equipment. All equipment, including fixtures, supporting structures and electrical apparatus shall be owned, installed, and maintained by the Corporation. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required for the extension of secondary service lines or the installation of a transformer, will be billed to the consumer.

433

Data:2cac15b8-fb54-4701-8a31-18a7f4543add | Open Energy Information  

Open Energy Info (EERE)

5b8-fb54-4701-8a31-18a7f4543add 5b8-fb54-4701-8a31-18a7f4543add No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: ED - Economic Development Sector: Commercial Description: * applicable to any new Non-Residential Customer who establishes initial permanent service in a new or existing establishment, and to any existing Non-Residential Customer who expands an existing establishment, who: 1. Receives service under Rate DGS, LP, or HLF, 2. Makes application to Company for service under this Rider, 3. Has applied for and received economic development assistance from State or local government or other public agency,

434

Data:8cd825d1-82b8-498f-99d6-197cdeeab79a | Open Energy Information  

Open Energy Info (EERE)

25d1-82b8-498f-99d6-197cdeeab79a 25d1-82b8-498f-99d6-197cdeeab79a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

435

Data:9227d6b8-9cf3-4c39-821b-5b1752c23277 | Open Energy Information  

Open Energy Info (EERE)

d6b8-9cf3-4c39-821b-5b1752c23277 d6b8-9cf3-4c39-821b-5b1752c23277 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northcentral Mississippi E P A Effective date: 2011/10/01 End date if known: Rate name: Outdoor Lighting HPS 100 W Sector: Lighting Description: *The energy charge in Part A and Part B of this rate schedule shall be increased or decreased in accordance with the current Adjustment Addendum published by TVA. In addition, the energy charge in Part A and Part B of this rate schedule shall be increased or decreased to correspond to increases or decreases determined by TVA under Adjustment 4 of the wholesale power rate schedule applicable under contractual arrangements between TVA and Distributor.

436

Data:8049b92b-ed71-4510-8d95-c42b2f8468b8 | Open Energy Information  

Open Energy Info (EERE)

b92b-ed71-4510-8d95-c42b2f8468b8 b92b-ed71-4510-8d95-c42b2f8468b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oncor Electric Delivery Company LLC Effective date: 2012/01/01 End date if known: Rate name: Metered Facilities - Company-Owned (Closed to new installations) Sector: Lighting Description: Source or reference: http://www.oncor.com/EN/Documents/About%20Oncor/Billing%20Rate%20Schedules/Tariff%20for%20Retail%20Delivery%20Service_05-30-13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

437

Data:Cd7ace17-953d-462c-a995-89b8e2153e86 | Open Energy Information  

Open Energy Info (EERE)

Cd7ace17-953d-462c-a995-89b8e2153e86 Cd7ace17-953d-462c-a995-89b8e2153e86 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule FE Farm Service - Energy Sector: Commercial Description: Applicability This schedule applies to farm service where agricultural end-uses include growing crops, raising livestock, other related farm uses, or pumping water for agricultural and public utility purposes not eligible for Rate Schedule PI. This schedule is not applicable to agricultural processing operations or other uses that change the form of the product. This schedule is applicable on an annual basis only.

438

Data:Af44dc0c-12b1-434b-8a26-dbc88de4ec13 | Open Energy Information  

Open Energy Info (EERE)

4dc0c-12b1-434b-8a26-dbc88de4ec13 4dc0c-12b1-434b-8a26-dbc88de4ec13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Residential Time of Use Rate 61 Sector: Residential Description: Except as noted below, this rate is available to residential customers for single-phase electric service at secondary voltage in individual private dwellings or individual apartments, including electric house heating and water heating, and, on an optional basis, to farms engaged principally in the raising of crops, horticulture, forestry, husbandry, stock raising, dairying, or poultry raising and egg production.

439

Data:331ce72c-3bff-430f-88f3-2d671e4aa4b8 | Open Energy Information  

Open Energy Info (EERE)

2c-3bff-430f-88f3-2d671e4aa4b8 2c-3bff-430f-88f3-2d671e4aa4b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: (RATE SCHEDULE 18)LARGE SERVICE - SINGLE-PHASE - 400 AMP OR GREATER Sector: Commercial Description: This rate schedule is available upon application to all member/owners with annual electric use of at least 75,000 kilowatt-hours (kWh), who agree to allow the Cooperative to interrupt all electric service for the period of time specified for all uses, including lighting, heating, and power, subject to the established rules and regulations of the Cooperative. Service under this schedule to permanent installations requires no less than 75 kVA of transformer capacity.

440

Data:Dcce4c2a-20b4-4dc4-a998-780f72c27b8a | Open Energy Information  

Open Energy Info (EERE)

Dcce4c2a-20b4-4dc4-a998-780f72c27b8a Dcce4c2a-20b4-4dc4-a998-780f72c27b8a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Athens Utility Board Effective date: 2011/04/01 End date if known: Rate name: Outdoor Lighting: Metal Halide 1000W Flood Sector: Lighting Description: Installations charge per light: $50.00 Pole charge per month: $2.00(included in the fixed monthly charge) Source or reference: http://www.aub.org/rate_power_ol.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

Note: This page contains sample records for the topic "b8 year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:F6ccb605-3162-48c1-af09-08b1b8edaf5a | Open Energy Information  

Open Energy Info (EERE)

ccb605-3162-48c1-af09-08b1b8edaf5a ccb605-3162-48c1-af09-08b1b8edaf5a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

442

Data:F214e91b-8f61-4ebd-8787-7e3f5e0cfd56 | Open Energy Information  

Open Energy Info (EERE)

1b-8f61-4ebd-8787-7e3f5e0cfd56 1b-8f61-4ebd-8787-7e3f5e0cfd56 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Street Lighting 200w HPS District-Owened Sector: Lighting Description: Schedule 51 - Street Lighting-metered Applicable: To governmental agencies and municipal corporations upon receipt of an authorized application for the supply of lighting facilities or energy and maintenance of lighting systems for public streets, alleys, throughfares, grounds and parks. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/16/

443

Data:8130803b-8b68-4490-9f40-9e4479b6e9b4 | Open Energy Information  

Open Energy Info (EERE)

03b-8b68-4490-9f40-9e4479b6e9b4 03b-8b68-4490-9f40-9e4479b6e9b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Schedule R-LM Sector: Residential Description: Limited availability to Members of the Cooperative taking Electric Delivery or Electric Supply and Delivery Services taken through a single meter used in and around the residence for domestic purposes and for service on a farm including preparation of the farm's products for market. Members taking service under this schedule agree to allow the Cooperative to cycle off and on the Members electric domestic water heaters and/or central air conditioners during those times that demand and energy for electricity on the Cooperative's system is anticipated to be high capacity or high cost. This Schedule is intended for service to single residential housekeeping units and is not intended for multi-family dwellings, for processing of farm products produced by others, for separately metered operations, or for commercial or industrial purposes. The Member shall not use a motor in excess of 10 H.P. without prior approval of the Cooperative.

444

Data:7fb28492-4cc1-45b8-9fa5-36d38248bbda | Open Energy Information  

Open Energy Info (EERE)

8492-4cc1-45b8-9fa5-36d38248bbda 8492-4cc1-45b8-9fa5-36d38248bbda No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wright-Hennepin Coop Elec Assn Effective date: 2010/08/01 End date if known: Rate name: Predetermined Demand Level Rate Sector: Commercial Description: Demand in excess of PDL during Peak Control Period = $15/kW if the member does not interrupt to the established PDL during the control period for the month. Source or reference: www.whe.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

445

Data:Dff95b8a-b6ab-451f-a26e-7581ec11f69b | Open Energy Information  

Open Energy Info (EERE)

Dff95b8a-b6ab-451f-a26e-7581ec11f69b Dff95b8a-b6ab-451f-a26e-7581ec11f69b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Area Lighting- (1000W MH With 35' Wood Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

446

Data:F7f631ae-71b8-4744-8fd1-fd990754e7f9 | Open Energy Information  

Open Energy Info (EERE)

1ae-71b8-4744-8fd1-fd990754e7f9 1ae-71b8-4744-8fd1-fd990754e7f9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2009/02/01 End date if known: Rate name: Small General Service- Three Phase Sector: Commercial Description: This Schedule is available for electric service at a single point of delivery, at one of the City's standard voltages, used by any non-residential Customer with monthly energy readings of less than 2500 kWh for a least ten of the preceding twelve months. When the customer's monthly energy has equaled or exceeds 2500 kWh for at least three of the preceding twelve months, the City may install a demand meter to determine the maximum 15-minute demand and begin billing the Customer for demand under Small General Service Schedule 04.