National Library of Energy BETA

Sample records for b46 include complete

  1. Thirty-Two Complete Genome Assemblies of Nine Yersinia Species, Including Y.pestis, Y.pseudotuberculosis, and Y.enterocolitica

    SciTech Connect (OSTI)

    Johnson, Shannon L.; Daligault, Hajnalka E.; Davenport, Karen W.; Jaissle, James; Frey, Kenneth G.; Ladner, Jason T.; Broomall, Stacey M.; Bishop-Lilly, Kimberly A.; Bruce, David C.; Coyne, Susan R.; Gibbons, Henry S.; Lo, Chien-Chi; Munk, A. Christine; Rosenzweig, C. Nicole; Koroleva, Galina I.; Palacios, Gustavo F.; Redden, Cassie L.; Xu, Yan; Minogue, Timothy D.; Chain, Patrick S.

    2015-04-30

    The genus Yersinia includes three human pathogens, of which Yersinia pestis is responsible for >2,000 illnesses each year. To aid in the development of detection assays as well as aid further phylogenetic elucidation, we sequenced and assembled the complete genomes of 32 strains (across 9 Yersinia species).

  2. Thirty-Two Complete Genome Assemblies of Nine Yersinia Species, Including Y. pestis, Y. pseudotuberculosis, and Y. enterocolitica

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Johnson, Shannon L.; Daligault, Hajnalka E.; Davenport, Karen W.; Jaissle, James; Frey, Kenneth G.; Ladner, Jason T.; Broomall, Stacey M.; Bishop-Lilly, Kimberly A.; Bruce, David C.; Coyne, Susan R.; et al

    2015-04-30

    The genus Yersinia includes three human pathogens, of which Yersinia pestis is responsible for >2,000 illnesses each year. To aid in the development of detection assays as well as aid further phylogenetic elucidation, we sequenced and assembled the complete genomes of 32 strains (across 9 Yersinia species).

  3. b46.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    ... 2,716 2,131 1,395 2,005 3,163 4,108 District Chilled Water ...... Energy End Uses (more than one may apply) Buildings with Space Heating ...... 60,028 ...

  4. Deactivation Completion and Turnover

    Broader source: Energy.gov [DOE]

    Achieving consensus that deactivation is complete can involve several parties including the deactivation contractor, the Field Office, DOE Headquarters, the post-deactivation contractor, regulators...

  5. COMPLETE LISTING:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMPLETE LISTING: DISPOSITION AUTHORITIES FROZEN UNDER THE EPIDEMIOLOGICAL MORATORIUM MARCH 2008 Listed below are all the disposition authorities which are under the moratorium on the destruction of health related records as of March 2008. All records scheduled under these authorities at Department of Energy (DOE) headquarters and field sites should be preserved past their normal retention periods unless an headquarters organization or a field site has obtained permission to remove records

  6. Completion and workover fluid

    SciTech Connect (OSTI)

    Block, J.

    1985-09-17

    An aqueous completion or workover fluid for oil or gas wells having at least two solid components. One component is a hydroxy containing aluminum compound represented by the formula AlO(OH).xH/sub 2/O. The second component is a fluid loss control agent which can be either a cross-linked polyvinyl alcohol or a cross-linked hydroxyalkyl cellulose reaction product. An acid soluble weighting agent can be added for wells having higher down hole pressures. Examples of the weighting agents include iron carbonates, iron oxides, calcium carbonates, dolomite, sodium or calcium chloride, zinc bromide and calcium bromide. After use, the fluid can be displaced from the well with acid, e.g. 15% HCl, and the cake previously deposited on the bore-hole wall is dissolved by the acid so that no damaging residue remains.

  7. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training...

  8. Pump apparatus including deconsolidator

    DOE Patents [OSTI]

    Sonwane, Chandrashekhar; Saunders, Timothy; Fitzsimmons, Mark Andrew

    2014-10-07

    A pump apparatus includes a particulate pump that defines a passage that extends from an inlet to an outlet. A duct is in flow communication with the outlet. The duct includes a deconsolidator configured to fragment particle agglomerates received from the passage.

  9. Edison's move has completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed January 8, 2016 by Richard Gerber We're pleased to announce that Edison is once again available to all NERSC users. The move from the NERSC Oakland Scientific Facility...

  10. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  11. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  12. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  13. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  14. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  15. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  16. Franklin Completed Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Jobs Franklin Completed Jobs Select a time period Show jobs that completed after Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 @ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 : 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

  17. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  18. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  19. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  20. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  1. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complaint Form Complaint Form The Office of Inspector General (OIG) maintains a Hotline to facilitate the reporting of allegations of fraud, waste, abuse, or mismanagement in U.S. Department of Energy (DOE) programs or operations. To submit an allegation to the OIG, complete the form below. Acknowledgement * I acknowledge that I have read the Office of Inspector General Hotline section of the OIG website regarding issues which should be reported to the OIG, complaint processing, anonymity and

  2. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2010-08-17

    Methods, apparatus, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA engine on an origin compute node in an injection FIFO buffer, a data descriptor for an application message to be transferred to a target compute node on behalf of an application on the origin compute node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying an address of a completion notification field in application storage for the application; transferring, by the origin DMA engine to the target compute node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that the transfer of the message is complete, including performing a local direct put operation to store predesignated notification data at the address of the completion notification field.

  3. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J. , Blocksome; Michael A. , Parker; Jeffrey J.

    2011-02-15

    Methods, systems, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA on an origin node in an origin injection FIFO, a data descriptor for an application message; inserting, by the origin DMA, a reflection descriptor in the origin injection FIFO, the reflection descriptor specifying a remote get operation for injecting a completion notification descriptor in a reflection injection FIFO on a reflection node; transferring, by the origin DMA to a target node, the message in dependence upon the data descriptor; in response to completing the message transfer, transferring, by the origin DMA to the reflection node, the completion notification descriptor in dependence upon the reflection descriptor; receiving, by the origin DMA from the reflection node, a completion packet; and notifying, by the origin DMA in response to receiving the completion packet, the origin node's processing core that the message transfer is complete.

  4. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2011-02-15

    DMA transfer completion notification includes: inserting, by an origin DMA engine on an origin node in an injection first-in-first-out (`FIFO`) buffer, a data descriptor for an application message to be transferred to a target node on behalf of an application on the origin node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying a packet header for a completion notification packet; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; sending, by the origin DMA engine, the completion notification packet to a local reception FIFO buffer using a local memory FIFO transfer operation; and notifying, by the origin DMA engine, the application that transfer of the message is complete in response to receiving the completion notification packet in the local reception FIFO buffer.

  5. Financial Management Handbook - Complete

    Broader source: Energy.gov (indexed) [DOE]

    ... and obligations for travel during year-end periods may be included in year-end guidance provided by the CFO Office of Finance and Accounting. d. Training and Development. ...

  6. Completed EISs | Department of Energy

    Energy Savers [EERE]

    CompleteProject List.doc� CompleteProject List.doc� PDF icon CompleteProject List.doc� More Documents & Publications Tribal Energy Program February 2012 Award Project Descriptions CX-008525: Categorical Exclusion Determination 2010 Program Review Meeting

    Completed EISs Completed EISs Comprehensive EIS list PDF icon Completed EISs More Documents & Publications Environmental Impact Statements and Environmental Assessments Status Chart NEPA Documentation 2013 Annual

  7. Completed Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed Sites Completed Sites Completed Sites The Office of Environmental Management (EM) has been or is currently responsible for cleaning up sites across the United States. These sites were associated with the legacy of the nation's nuclear weapons program and other DOE research and development activities. Many of these sites have been cleaned up and transferred to other entities or to DOE's Legacy Management (LM) Program. Completed Sites Listing

  8. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A; Kumar, Sameer; Parker, Jeffrey J

    2014-05-20

    Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

  9. DOE Completes Five Recovery Act Projects

    Broader source: Energy.gov [DOE]

    DOE's EM program recently completed five projects at the Oak Ridge site funded through the Recovery Act. The projects included the expansion of two landfills at the Oak Ridge Reservation (ORR) and pre-demolition and demolition projects at ETTP and Y-12.

  10. Pure-state informationally complete and 'really' complete measurements

    SciTech Connect (OSTI)

    Finkelstein, J.

    2004-11-01

    I construct a positive-operator-valued measure (POVM) which has 2d rank-1 elements and which is informationally complete for generic pure states in d dimensions, thus confirming a conjecture made by Flammia, Silberfarb, and Caves (e-print quant-ph/0404137). I show that if a rank-1 POVM is required to be informationally complete for all pure states in d dimensions, it must have at least 3d-2 elements. I also show that, in a POVM which is informationally complete for all pure states in d dimensions, for any vector there must be at least 2d-1 POVM elements which do not annihilate that vector.

  11. Subsea completion data show steady activity levels

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1993-02-01

    Review of subsea completion statistics indicates 45 installations during 1992 - one more than during 1991. The 45 installations are still considerably less than the all-time high of 66 installations in 1985. Petrobras continues to install three times as many subsea completions as Shell, the next most active user. However, as in the past three years, the overall-lower number of installations last year was due to reduced applications by Petrobras. During 1991, that company installed 10 subsea completions, whereas during 1988, for example, it completed 37 installations. It should be noted that reduced activity by petrobras reflects problems with financing and general activity, rather than a lack of confidence in subsea completions. The number of future subsea completions identified for installation during the next 10 years is 1,144 - some 10% more than the 1,014 identified at the end of 1991. The present planned installation figure is an all-time high; the next highest number of installations identified was 1,083 at the end of 1989. These and other statistics are presented in 10 tables. A brief analysis of each is included.

  12. Completeness for sparse potential scattering

    SciTech Connect (OSTI)

    Shen, Zhongwei

    2014-01-15

    The present paper is devoted to the scattering theory of a class of continuum Schrdinger operators with deterministic sparse potentials. We first establish the limiting absorption principle for both modified free resolvents and modified perturbed resolvents. This actually is a weak form of the classical limiting absorption principle. We then prove the existence and completeness of local wave operators, which, in particular, imply the existence of wave operators. Under additional assumptions on the sparse potential, we prove the completeness of wave operators. In the context of continuum Schrdinger operators with sparse potentials, this paper gives the first proof of the completeness of wave operators.

  13. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tonnessen, S.H. )

    1992-12-01

    Well-service operations on subsea completions at Saga Petroleum's Snorre field performed by TFL (through-flowline) methods. These operations will be carried out by an innovative system that advances the state-of-the-art for TFL technology. The initial field development phase for Snorre includes 10 subsea wells mounted no a large template known as the Subsea Production System, or SPS. The 2 [times] 10 well slot arrangement on the SPS allows additional wells to be drilled as needed to replace the original ten. The template is located 6,500 m (21,320 ft) from the Snorre TLP and is connected to it by two 8-in. production lines, one 8-in. water injection line and two 3-in.-ID TFL service lines. The wells will be completed with dual 3 1/2-in. Tubing strings for TFL service operations. This article will overview the Snorre TFL system and discuss completion design.

  14. Well completion and servicing fluid

    SciTech Connect (OSTI)

    Grimsley, R.L.

    1990-09-25

    This patent describes a well completion servicing fluid for controlling formation pressure during completion or servicing of a well. It comprises: an aqueous solution of calcium chloride, a solid weighing agent suspended in the solution and being selected from the group consisting of zinc, zinc oxide, and mixtures thereof; and a viscosifier dissolved in the solution in an amount effective to suspend the weighing agent. The fluid has a density of greater than 15 pounds per gallon and being substantially free of bromide ions and being substantially free of solid material which is not soluble in hydrochloric acid.

  15. Completed NSTX-U. After

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    panel (15 tons) being inserted into the new neutral beam box. New neutral beam box (40 tons) being moved into the NSTX-U test cell. Center stack encased within the vacuum boundary and lowered into the NSTX-U. Completed center stack installed in the NSTX-U. Completed NSTX-U. After Original NSTX prior to the upgrade. Before Building the first quadrant of the center stack magnet. Winding the ohmic heating coil around the center stack. National Spherical Torus Experiment - Upgrade NSTX was a

  16. Administration Building demolition completed under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Building demolition completed under budget Administration Building demolition completed under budget Project activities started in April 2009 and was completed five...

  17. China National Machinery Industry Complete Engineering Corporation...

    Open Energy Info (EERE)

    Industry Complete Engineering Corporation CMCEC Jump to: navigation, search Name: China National Machinery Industry Complete Engineering Corporation (CMCEC) Place: Beijing,...

  18. Subsea completion technology needs advances

    SciTech Connect (OSTI)

    Ledbetter, R.

    1995-09-18

    Subsea technology needs further advances to reduce operational costs before operators will expand the use of subsea well completions in the Gulf of Mexico. They will continue to choose surface completion-oriented systems as long as these are more economical operationally than subsea system. Designs of subsea equipment such as trees, connectors, control pods, umbilicals, and flow lines, must bring about reductions in the cost of both installation and workover compatibility. Remote operated vehicle (ROV) manipulation is one avenue that should be exploited. The bottom line is that significant cooperation between equipment manufacturers and ROV companies is needed to develop advanced ROV technology, and operators should be involved to help guide operational strategies.

  19. Complete EOS for PBX 9502

    SciTech Connect (OSTI)

    Menikoff, Ralph S

    2009-10-08

    PBX 9502 is an insensitive plastic-bonded explosive based on triamino-trinitrobenzene (TATB). A complete equation of state (EOS) is constructed for unreacted PBX 9502 suitable for reactive burn models, i.e., high pressure regime in which material strength is unimportant. The PBX EOS is composed of two parts: a complete EOS for TATB and a porosity model which allows for variations in the initial PBX density. The TATB EOS is based on a cold curve and a thermal model for lattice vibrations. The heat capacity, and hence thermal model, is determined by the vibrational spectrum from Raman scattering. The cold curve is calibrated to diamond anvil cell data for isothermal compression using a two-piece Keane fitting form. Hugoniot data for PBX 9502 is used as a consistency check.

  20. Complete liquefaction methods and apparatus

    SciTech Connect (OSTI)

    Turner, Terry D.; Wilding, Bruce M.

    2013-10-15

    A method and apparatus are described to provide complete gas utilization in the liquefaction operation from a source of gas without return of natural gas to the source thereof from the process and apparatus. The mass flow rate of gas input into the system and apparatus may be substantially equal to the mass flow rate of liquefied product output from the system, such as for storage or use.

  1. Subsea completions: Subsea continues strong

    SciTech Connect (OSTI)

    Mohr, H.O.

    1996-02-01

    Comparison of 1995 statistics to the previous three years indicates that the trend for applying subsea completions remains steady at about 80 installations per year. Consistent performance at this high level means industry maintains confidence in the technology. As recently as 1990, there was a low of 36 installations--the all-time high, prior to 1993, had been 66 during 1985. Another positive indicator is the number of identified future subsea completions, i.e., those in progress, or site-specific applications under consideration. This statistic also remains steady, with 1,340 at the end of 1995, and 1,341 and 1,315 at year-end 1994 and 1993. As a comparison, in 1989 and 1990, there were 1,083 and 976 identified. Petrobras is the leading user of subsea completions with 248, three times as many as Shell, the second most active operator. The ten tables of data shown list operating companies making the installations, where they are, what type, water depth, manufacturer and other descriptive features. Preceding discussions cover industry trends and development activity influencing the installations.

  2. Ad Building demolition, recycling completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEPatents Actively controlled vibration welding system and method Title: Actively controlled vibration welding system and method A vibration welding system includes a controller, welding horn, an active material element, and anvil assembly. The assembly may include an anvil body connected to a back plate and support member. The element, e.g., a piezoelectric stack or shape memory alloy, is positioned with respect to the assembly. The horn vibrates in a desirable first direction to form a

  3. Completed Sites Listing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup Sites » Completed Sites » Completed Sites Listing Completed Sites Listing As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 91 sites in 24 states. PDF icon Completed Sites Listing More Documents & Publications EM's Cleanup Mission: 16 Sites in 11 States Remaining EA-1406: Final Environmental Assessment Electronic Docket Room (e-Docket Room) Active Sites Active Sites Additional Information Completed Sites

  4. Engineering task plan TWRS technical baseline completion

    SciTech Connect (OSTI)

    Moore, T.L

    1996-03-08

    The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

  5. Complete Streets Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete Streets Resources Complete Streets Resources While transportation efficiency policies are often implemented under local governments, national and state programs can play...

  6. Method for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

    2002-01-01

    A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

  7. Completion Report for Well ER-12-4, Corrective Action Unit 99: Rainier Mesa - Shoshone Mountain (includes Errata Sheet)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2006-05-01

    Well ER-12-4 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in May 2005, as part of a hydrogeologic investigation program for the Rainier Mesa-Shoshone Mountain Corrective Action Unit in the north-central portion of the Nevada Test Site. The well is located on Rainier/Aqueduct Mesa, northwest of Yucca Flat, within Area 12 of the Nevada Test Site. The well provided information regarding the radiological and physical environment near underground nuclear tests conducted in U12t Tunnel, information on the pre-Tertiary rocks in the area, and depth to the regional water table.

  8. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Chen, Dong; Giampapa, Mark E.; Heidelberger, Philip; Kumar, Sameer; Parker, Jeffrey J.; Steinmacher-Burow, Burkhard D.; Vranas, Pavlos

    2010-07-27

    Methods, compute nodes, and computer program products are provided for direct memory access (`DMA`) transfer completion notification. Embodiments include determining, by an origin DMA engine on an origin compute node, whether a data descriptor for an application message to be sent to a target compute node is currently in an injection first-in-first-out (`FIFO`) buffer in dependence upon a sequence number previously associated with the data descriptor, the total number of descriptors currently in the injection FIFO buffer, and the current sequence number for the newest data descriptor stored in the injection FIFO buffer; and notifying a processor core on the origin DMA engine that the message has been sent if the data descriptor for the message is not currently in the injection FIFO buffer.

  9. ER-12-1 completion report

    SciTech Connect (OSTI)

    Russell, C.E.; Gillespie, D.; Cole, J.C.; Drellack, S.L.

    1996-12-01

    The objective of drillhole ER-12-1 was to determine the hydrogeology of paleozoic carbonate rocks and of the Eleana Formation, a regional aquitard, in an area potentially downgradient from underground nuclear testing conducted in nearby Rainier Mesa. This objective was addressed through the drilling of well ER-12-1 at N886,640.26 E640,538.85 Nevada Central Coordinates. Drilling of the 1094 m (3588 ft) well began on July 19, 1991 and was completed on October 17, 1991. Drilling problems included hole deviation and hole instability that prevented the timely completion of this borehole. Drilling methods used include rotary tri-cone and rotary hammer drilling with conventional and reverse circulation using air/water, air/foam (Davis mix), and bentonite mud. Geologic cuttings and geophysical logs were obtained from the well. The rocks penetrated by the ER-12-1 drillhole are a complex assemblage of Silurian, Devonian, and Mississippian sedimentary rocks that are bounded by numerous faults that show substantial stratigraphic offset. The final 7.3 m (24 ft) of this hole penetrated an unusual intrusive rock of Cretaceous age. The geology of this borehole was substantially different from that expected, with the Tongue Wash Fault encountered at a much shallower depth, paleozoic rocks shuffled out of stratigraphic sequence, and the presence of an altered biotite-rich microporphyritic igneous rock at the bottom of the borehole. Conodont CAI analyses and rock pyrolysis analyses indicate that the carbonate rocks in ER-12-1, as well as the intervening sheets of Eleana siltstone, have been thermally overprinted following movement on the faults that separate them. The probable source of heat for this thermal disturbance is the microporphyritic intrusion encountered at the bottom of the hole, and its age establishes that the major fault activity must have occurred prior to 102.3+0.5 Ma (middle Cretaceous).

  10. Apparatus for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A.

    2000-01-01

    An apparatus for the concurrent nondestructive evaluation of partially completed welds is described and which is used in combination with an automated welder and which includes an ultrasonic signal generator mounted on the welder and which generates an ultrasonic signal which is directed toward one side of the partially completed welds; an ultrasonic signal receiver mounted on the automated welder for detecting ultrasonic signals which are transmitted by the ultrasonic signal generator and which are reflected or diffracted from one side of the partially completed weld or which passes through a given region of the partially completed weld; and an analysis assembly coupled with the ultrasonic signal receiver and which processes the ultrasonic signals received by the ultrasonic signal receiver to identify welding flaws in the partially completed weld.

  11. Successful horizontal completions require an integrated approach

    SciTech Connect (OSTI)

    Richard, B.; Smejkal, K.; Penberthy, W. Jr.

    1997-01-01

    While a perfect well completion may not exist, depleting a hydrocarbon resource at a sustained high rate--without a workover--is the ultimate goal. Unfortunately, many horizontal well completions fail to achieve this due to wellbore damage or loss of reservoir pressure. These conditions manifest themselves in reduced production rates, extended well life and reduced profitability. Standard completion techniques are not always compatible with each other for site specific well applications. The combination of two incompatible technologies or slight changes in a completion procedure may negatively impact productivity. Hence, the most successful horizontal completion results are obtained using a compatible integrated system approach--an approach that carefully combines the best completion tools and processes to deliver an undamaged well completed at the lowest possible cost. After studying the compatibilities of various drill-in fluids, screens, filter cakes and gravel packs, recommended procedures are presented for successfully completing horizontal wells.

  12. Inspection apparatus for evaluating a partially completed weld

    DOE Patents [OSTI]

    Smartt, Herschel B.; Larsen, Eric D.; Johnson, Jonn A.

    2001-01-01

    An inspection apparatus for evaluating a partially completed weld is described and which is utilized in combination with an automated movable welder which moves across a supporting surface, and wherein the inspection apparatus includes a coupling member mounted on the welder; a frame member mounted on the coupling member; an ultrasonic sensor mounted on the frame member and disposed in ultrasonic sound transmitting relation relative to the partially completed weld; and a drive assembly for adjusting the position of the ultrasonic sensor relative to the partially completed weld.

  13. Subsea completions set for growth, standardization

    SciTech Connect (OSTI)

    Baugh, B.F.

    1988-08-22

    There have been enough subsea completion systems installed to permit categorization of some basic combinations and to permit users to choose from alternative styles. Nevertheless, advances in engineering standards, increasing capabilities, and a growing market will continue to make this an exciting area during the next 10 to 20 years. Fundamentally, subsea completion systems provide the same capabilities as surface completion and injection wells. However, they are of course more complex to accommodate special needs associated with subsea and remote operations. As of the end of 1987, there had been 472 subsea completions installed. A total of 671 future subsea completions have been identified. These completions have been characterized by differences in styles, applications, manufacturer designs, and user preferences. Subsea completions are characterized by many alternatives for construction and operation. As a result, they cannot be simply categorized by as few styles. Identifying these basic combinations gives the reader the capability to envision the alternatives which might suit his or her particular needs.

  14. Quantitative Analysis of Biofuel Sustainability, Including Land...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions ...

  15. Entiat 4Mile WELLs Completion Report, 2006.

    SciTech Connect (OSTI)

    Malinowksi, Richard

    2007-01-01

    The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

  16. Sediment Properties: E-Area Completion Project

    SciTech Connect (OSTI)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for

  17. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Hanford Site Cleanup Completion Framework Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email

  18. JOBAID-LAUNCHING AND COMPLETING ASSIGNED SURVEY

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surverys.

  19.  Westinghouse Completes its AP1000...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westinghouse Completes its AP1000 Test Stand VERA-CS Coupled Multi-physics ... HPC in the Nuclear Power Industry TVA Test Stand Launched November 2013 Volume 1, ...

  20. Geothermal Well Completion Tests | Open Energy Information

    Open Energy Info (EERE)

    and immediately after drilling activities are completed. Author Hagen Hole Conference Petroleum Engineering Summer School; Dubrovnik, Croatia; 20080609 Published NA, 2008 DOI...

  1. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    waste landfill. "The Recovery Act has been a huge boost to our overall cleanup efforts," said Michael Graham, LANL's associate director of environmental programs. "Completing...

  2. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  3. Completion practices in deep sour Tuscaloosa wells

    SciTech Connect (OSTI)

    Huntoon, G.G.

    1984-01-01

    Successful development of the Tuscaloosa trend in Louisiana has required unique completion practices to produce the trend's deep sour formations. Amoco's operations in the Tuscaloosa formation are between 16,000 and 21,000 ft (4877 and 6400 m), and a range of pressure environments, high temperatures, and corrosive elements is encountered. Application of proved completion practices and equipment has resulted in several techniques that enhance the safety, longevity, and production capacity of these wells. The design of deep Tuscaloosa completions is assisted by a series of correlations developed to project bottomhole and surface shut-in tubing pressures, temperature gradients, and flow capacities for deep sour wells. This paper discusses material selection, completion practices, completion fluids, wellhead equipment, packer designs, corrosion-inhibition systems, and safety and monitoring equipment used in the Tuscaloosa trend. The design of a wellhead surface installation used to detect equipment failure, to pump kill fluids, and to circulate corrosion inhibitors is reviewed. A case study illustrates the methods used in completing a Tuscaloosa well with surface pressures exceeding 16,000 psi (110.3 MPa). Deep high-pressure sour-gas wells can be completed safely if all the elements of the environment that will affect the mechanical integrity of the wellbore are considered in the completion designs. The development of higher-strength material capable of withstanding SSC is needed if wells are completed in formations deeper than 22,000 ft (6700 m). Further research is necessary on the use of alloy steels and nonferrous metals for sour service. Effective high-temperature corrosion inhibitors for heavy zinc bromide completion fluids must be developed before these brines can be used in the Tuscaloosa. The testing of new inhibitors for use in highpressure sour-gas completions should be continued.

  4. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

    2014-07-01

    Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

  5. Oak Ridge completes field work on Recovery Act-projects | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Completion Date: February 2013 Bethel Valley Burial Grounds: The Bethel Valley Burial Ground Project remediated a series of sites including Solid Waste Storage Areas 1 and 3,...

  6. INSTRUMENTATION, INCLUDING NUCLEAR AND PARTICLE DETECTORS; RADIATION

    Office of Scientific and Technical Information (OSTI)

    interval technical basis document Chiaro, P.J. Jr. 44 INSTRUMENTATION, INCLUDING NUCLEAR AND PARTICLE DETECTORS; RADIATION DETECTORS; RADIATION MONITORS; DOSEMETERS;...

  7. Annual Technology Baseline (Including Supporting Data); NREL...

    Office of Scientific and Technical Information (OSTI)

    Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title: Annual Technology Baseline ...

  8. EM's Paducah Site Completes Building Removals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM's Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals Addthis

  9. Property:CompletionNotes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  10. Environmental Management Completed Projects 2005-Present

    Broader source: Energy.gov [DOE]

    This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project’s performance related to cost, schedule, and...

  11. Definition of Environmental Management (EM) Completion

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2)...

  12. JLab Completes 100th Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes 100th Experiment JLab Completes 100th Experiment The experiment, titled "Quark Propagation through Cold QCD Matter," began its run in December 2003 and wrapped up in early March. It probed Quantum Chromodynamics (QCD), a fundamental theory of particle physics that describes the interactions of quarks and gluons - the basic building blocks of matter. A property of QCD, called confinement, states that no quark can ever be found alone. Instead, quarks combine in pairs or

  13. LANL completes CRADA with Biomagnetics, Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRADA with Biomagnetics, Inc. completed LANL completes CRADA with Biomagnetics, Inc. The CRADA was created to continue work on developing a commercial product that could detect a specific biomarker in urine that could aid in the diagnosis of tuberculosis infection. September 23, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable

  14. Lab completes Recovery Act-funded demolition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act-funded demolition completed Lab completes Recovery Act-funded demolition The building was the largest of the 24 demolished at LANL's historic Technical Area 21. January 19, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of

  15. First trillion particle cosmological simulation completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First trillion particle cosmological simulation completed First trillion particle cosmological simulation completed A team of astrophysicists and computer scientists has created high-resolution cyber images of our cosmos. January 8, 2015 Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total simulation volume. Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total

  16. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  17. Gas storage materials, including hydrogen storage materials

    DOE Patents [OSTI]

    Mohtadi, Rana F; Wicks, George G; Heung, Leung K; Nakamura, Kenji

    2013-02-19

    A material for the storage and release of gases comprises a plurality of hollow elements, each hollow element comprising a porous wall enclosing an interior cavity, the interior cavity including structures of a solid-state storage material. In particular examples, the storage material is a hydrogen storage material such as a solid state hydride. An improved method for forming such materials includes the solution diffusion of a storage material solution through a porous wall of a hollow element into an interior cavity.

  18. Gas storage materials, including hydrogen storage materials

    DOE Patents [OSTI]

    Mohtadi, Rana F; Wicks, George G; Heung, Leung K; Nakamura, Kenji

    2014-11-25

    A material for the storage and release of gases comprises a plurality of hollow elements, each hollow element comprising a porous wall enclosing an interior cavity, the interior cavity including structures of a solid-state storage material. In particular examples, the storage material is a hydrogen storage material, such as a solid state hydride. An improved method for forming such materials includes the solution diffusion of a storage material solution through a porous wall of a hollow element into an interior cavity.

  19. Communications circuit including a linear quadratic estimator

    DOE Patents [OSTI]

    Ferguson, Dennis D.

    2015-07-07

    A circuit includes a linear quadratic estimator (LQE) configured to receive a plurality of measurements a signal. The LQE is configured to weight the measurements based on their respective uncertainties to produce weighted averages. The circuit further includes a controller coupled to the LQE and configured to selectively adjust at least one data link parameter associated with a communication channel in response to receiving the weighted averages.

  20. Intentionally Including - Engaging Minorities in Physics Careers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Intentionally Including - Engaging Minorities in Physics Careers Intentionally Including - Engaging Minorities in Physics Careers April 24, 2013 - 4:37pm Addthis Joining Director Dot Harris (second from left) were Marlene Kaplan, the Deputy Director of Education and director of EPP, National Oceanic and Atmospheric Administration, Claudia Rankins, a Program Officer with the National Science Foundation and Jim Stith, the past Vice-President of the American Institute of

  1. MHK technologies include current energy conversion

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    technologies include current energy conversion (CEC) devices, e.g., hydrokinetic turbines that extract power from water currents (riverine, tidal, and ocean) and wave energy conversion (WEC) devices that extract power from wave motion. Sandia's MHK research leverages decades of experience in engineering and design and analysis (D&A) of wind power technologies, and its vast research complex, including high-performance computing (HPC), advanced materials and coatings, nondestructive

  2. UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITY

    SciTech Connect (OSTI)

    Joel W. Muehlhauser

    2004-07-21

    In this final technical report, UTSI summarizes work completed under DOE Contract No. DE-AC22-95PC95231. This work began on the contract effective date, September 15, 1995 and is continuing on a very small basis to complete the groundwater remediation as of this date. The work scope required UTSI to continue to maintain the DOE Coal Fired Flow Facility and keep it in readiness for anticipated testing. This effort was terminated in September 1998 by DOE stop-work letter. Work continued on reporting, environmental restoration and on the High Temperature Superconductivity work that was underway. The work included preparing reports on the MHD POC tests that had been completed just prior to this contract initiation under an earlier contract with DOE Chicago. These four reports are summarized herein. This report summarizes the environmental restoration work performed under the contract, including groundwater monitoring and remediation, removal of wastes from the facility, removal of asbestos from the cooling tower and actions in compliance with the license to discharge water into Woods Reservoir. This report covers work in support of the DOE High Temperature Superconductivity program including: (1) Assistance to DOE in preparing a development plan; (2) Cooperation with industry, national laboratories and other universities to promote the commercialization of thin film superconductors (coated conductors); (3) Process Evaluations; (4) Process Diagnostic Development; and (5) Process Economics. The assistance to DOE task included convening an advisory board composed of all the major participants in the DOE program and preparing a draft development plan and Research and Development Roadmap leading to commercialization of the coated conductor technology. Under this program, cooperative agreements and cooperative work was undertaken with Oak Ridge National Laboratory, Midwest Superconductivity, Inc., EURUS Technologies, Inc., Westinghouse Electric Company, and others. In the process evaluation task, four studies were completed by faculty, staff and students. Summaries of these studies are included in this report. In process diagnostic development, three studies were completed, all emphasizing diagnostics that are applicable to real time control of manufacturing processes. In Process Economics, one study was completed that estimated the manufacturing cost of superconducting wire produced by two of the process thought to be most promising.

  3. Scramjet including integrated inlet and combustor

    SciTech Connect (OSTI)

    Kutschenreuter, P.H. Jr.; Blanton, J.C.

    1992-02-04

    This patent describes a scramjet engine. It comprises: a first surface including an aft facing step; a cowl including: a leading edge and a trailing edge; an upper surface and a lower surface extending between the leading edge and the trailing edge; the cowl upper surface being spaced from and generally parallel to the first surface to define an integrated inlet-combustor therebetween having an inlet for receiving and channeling into the inlet-combustor supersonic inlet airflow; means for injecting fuel into the inlet-combustor at the step for mixing with the supersonic inlet airflow for generating supersonic combustion gases; and further including a spaced pari of sidewalls extending between the first surface to the cowl upper surface and wherein the integrated inlet-combustor is generally rectangular and defined by the sidewall pair, the first surface and the cowl upper surface.

  4. Electric Power Monthly, August 1990. [Glossary included

    SciTech Connect (OSTI)

    Not Available

    1990-11-29

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  5. Subsea completions: A record year in '93

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1994-02-01

    Review of subsea completion statistics for 1993 shows 78 installations--an 18% increase over the previous all-time high of 66 installations during 1985. Risking some dramatics, the 78 installations during '93 represent a 73% increase over the 45 installations during '92. And enthusiasm and positive outlook for continued application of subsea completions is clearly indicated in all major areas of the offshore world. Data suggest that the activity should continue to rise strongly toward the year 2000. At the end of 1993, the number of future subsea completions identified for installation during the next 10 years is 1,315--up 15% from the 1,144 identified at year-end 1992. The next highest number identified was 1,083 at the end of 1989, supporting a positive trend.

  6. Interim Ventilation System Tie-in Completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2016 Interim Ventilation System Tie-in Completed Early this week sub-contractors at the Waste Isolation Pilot Plant (WIPP) completed the "tie in" of the new interim ventilation system (IVS) to the ductwork for the existing underground ventilation system. Following a series of operational tests, the IVS is expected to increase airflow in the WIPP underground by approximately 54,000 cubic feet per minute. The tie-in operation consisted of removal of sections of the existing ductwork

  7. STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS

    SciTech Connect (OSTI)

    Stephen Wolhart

    2003-06-01

    The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

  8. DOE Completes TRU Waste Cleanup at Bettis

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M.– The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP).

  9. U.S. Geothermal Announces Successful Completion

    Broader source: Energy.gov [DOE]

    U.S. Geothermal Inc. (“U.S. Geothermal”), a renewable energy company focused on the production of electricity from geothermal energy, announced today that the first full size production well (NHS-1) at the Neal Hot Springs Project was successfully completed on May 23 and an initial flow test confirms the presence of a geothermal reservoir.

  10. Subterranean barriers including at least one weld

    DOE Patents [OSTI]

    Nickelson, Reva A.; Sloan, Paul A.; Richardson, John G.; Walsh, Stephanie; Kostelnik, Kevin M.

    2007-01-09

    A subterranean barrier and method for forming same are disclosed, the barrier including a plurality of casing strings wherein at least one casing string of the plurality of casing strings may be affixed to at least another adjacent casing string of the plurality of casing strings through at least one weld, at least one adhesive joint, or both. A method and system for nondestructively inspecting a subterranean barrier is disclosed. For instance, a radiographic signal may be emitted from within a casing string toward an adjacent casing string and the radiographic signal may be detected from within the adjacent casing string. A method of repairing a barrier including removing at least a portion of a casing string and welding a repair element within the casing string is disclosed. A method of selectively heating at least one casing string forming at least a portion of a subterranean barrier is disclosed.

  11. Photoactive devices including porphyrinoids with coordinating additives

    DOE Patents [OSTI]

    Forrest, Stephen R; Zimmerman, Jeramy; Yu, Eric K; Thompson, Mark E; Trinh, Cong; Whited, Matthew; Diev, Vlacheslav

    2015-05-12

    Coordinating additives are included in porphyrinoid-based materials to promote intermolecular organization and improve one or more photoelectric characteristics of the materials. The coordinating additives are selected from fullerene compounds and organic compounds having free electron pairs. Combinations of different coordinating additives can be used to tailor the characteristic properties of such porphyrinoid-based materials, including porphyrin oligomers. Bidentate ligands are one type of coordinating additive that can form coordination bonds with a central metal ion of two different porphyrinoid compounds to promote porphyrinoid alignment and/or pi-stacking. The coordinating additives can shift the absorption spectrum of a photoactive material toward higher wavelengths, increase the external quantum efficiency of the material, or both.

  12. Two-fluid turbulence including electron inertia

    SciTech Connect (OSTI)

    Andrs, Nahuel Gmez, Daniel; Gonzalez, Carlos; Martin, Luis; Dmitruk, Pablo

    2014-12-15

    We present a full two-fluid magnetohydrodynamic (MHD) description for a completely ionized hydrogen plasma, retaining the effects of the Hall current, electron pressure, and electron inertia. According to this description, each plasma species introduces a new spatial scale: the ion inertial length ?{sub i} and the electron inertial length ?{sub e}, which are not present in the traditional MHD description. In the present paper, we seek for possible changes in the energy power spectrum in fully developed turbulent regimes, using numerical simulations of the two-fluid equations in two-and-a-half dimensions. We have been able to reproduce different scaling laws in different spectral ranges, as it has been observed in the solar wind for the magnetic energy spectrum. At the smallest wavenumbers where plain MHD is valid, we obtain an inertial range following a Kolmogorov k{sup ?5?3} law. For intermediate wavenumbers such that ?{sub i}{sup ?1}?k??{sub e}{sup ?1}, the spectrum is modified to a k{sup ?7?3} power-law, as has also been obtained for Hall-MHD neglecting electron inertia terms. When electron inertia is retained, a new spectral region given by k>?{sub e}{sup ?1} arises. The power spectrum for magnetic energy in this region is given by a k{sup ?11?3} power law. Finally, when the terms of electron inertia are retained, we study the self-consistent electric field. Our results are discussed and compared with those obtained in the solar wind observations and previous simulations.

  13. Power generation method including membrane separation

    DOE Patents [OSTI]

    Lokhandwala, Kaaeid A.

    2000-01-01

    A method for generating electric power, such as at, or close to, natural gas fields. The method includes conditioning natural gas containing C.sub.3+ hydrocarbons and/or acid gas by means of a membrane separation step. This step creates a leaner, sweeter, drier gas, which is then used as combustion fuel to run a turbine, which is in turn used for power generation.

  14. Nuclear reactor shield including magnesium oxide

    DOE Patents [OSTI]

    Rouse, Carl A.; Simnad, Massoud T.

    1981-01-01

    An improvement in nuclear reactor shielding of a type used in reactor applications involving significant amounts of fast neutron flux, the reactor shielding including means providing structural support, neutron moderator material, neutron absorber material and other components as described below, wherein at least a portion of the neutron moderator material is magnesium in the form of magnesium oxide either alone or in combination with other moderator materials such as graphite and iron.

  15. Electric power monthly, September 1990. [Glossary included

    SciTech Connect (OSTI)

    Not Available

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  16. Rotor assembly including superconducting magnetic coil

    DOE Patents [OSTI]

    Snitchler, Gregory L. (Shrewsbury, MA); Gamble, Bruce B. (Wellesley, MA); Voccio, John P. (Somerville, MA)

    2003-01-01

    Superconducting coils and methods of manufacture include a superconductor tape wound concentrically about and disposed along an axis of the coil to define an opening having a dimension which gradually decreases, in the direction along the axis, from a first end to a second end of the coil. Each turn of the superconductor tape has a broad surface maintained substantially parallel to the axis of the coil.

  17. Completion of the INEEL's WERF Incinerator Trial Burn

    SciTech Connect (OSTI)

    C. K. Branter; D. A. Conley; D. R. Moser; S. J. Corrigan

    1999-05-01

    This paper describes the successes and challenges associated with Resource Conservation and Recovery Act (RCRA) permitting of the Idaho National Engineering and Environmental Laboratory's (INEEL) Waste Experimental Reduction Facility (WERF) hazardous and mixed waste incinerator. Topics to be discussed include facility modifications and problems, trial burn results and lessons learned in each of these areas. In addition, a number of challenges remain including completion and final issue of the RCRA Permit and implementation of all the permit requirements. Results from the trial burn demonstrated that the operating conditions and procedures will result in emissions that are satisfactorily protective of human health, the environment, and are in compliance with Federal and State regulations.

  18. Completion of the INEEL's WERF Incinerator Trial Burn

    SciTech Connect (OSTI)

    Branter, Curtis Keith; Conley, Dennis Allen; Corrigan, Shannon James; Moser, David Roy

    1999-05-01

    This paper describes the successes and challenges associated with Resource Conservation and Recovery Act (RCRA) permitting of the Idaho National Engineering and Environmental Laboratory's (INEEL) Waste Experimental Reduction Facility (WERF) hazardous and mixed waste incinerator. Topics to be discussed include facility modifications and problems, trial burn results and lessons learned in each of these areas. In addition, a number of challenges remain including completion and final issue of RCRA Permit and implementation of all the permit requirements. Results from the trial burn demonstrated that the operating conditions and procedures will result in emissions that are satisfactorily protective of human health, the environment, and are in compliance with Federal and State regulations.

  19. Habitat Projects Completed within the Asotin Creek Watershed, 1998 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    1999-11-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed.

  20. Complete genome sequences for the anaerobic, extremely thermophilic...

    Office of Scientific and Technical Information (OSTI)

    Complete genome sequences for the anaerobic, extremely thermophilic plant ... Title: Complete genome sequences for the anaerobic, extremely thermophilic plant ...

  1. Deepwater completion and tieback -- A case study

    SciTech Connect (OSTI)

    Ghiselin, D.

    1996-10-01

    Major operators are engaged in large-scale integrated projects around the world. Does integration favor the big boys, or can a small independent operator benefit from this approach? Independent partners Hardy Oil and Gas USA and Samedan Oil Corp. looked into integrated project management to successfully design and install subsea completions, subsea pipelines, and platform tiebacks and interfaces to two platforms operated by Texaco and Chevron, respectively. The paper describes the project management approach taken and results of the project.

  2. National Rotor Testbed aerodynamic design complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aerodynamic design complete - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  3. Floating Oscillating Water Column Reference Model Completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Floating Oscillating Water Column Reference Model Completed - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense

  4. WIPP Successfully Completes ISO 14001 Certification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28, 2015 WIPP Successfully Completes ISO 14001 Certification The WIPP site successfully demonstrated to independent auditors that the WIPP Environmental Management System (EMS) meets all the requirements of the ISO 14001 standard. After a recent three days of reviewing the 17 elements of ISO 14001, the auditors concluded the EMS program and procedures properly manage the environmental aspects and impacts of WIPP operations to meet the standard's requirements. As a result, the certification of

  5. Drapery assembly including insulated drapery liner

    DOE Patents [OSTI]

    Cukierski, Gwendolyn (Ithaca, NY)

    1983-01-01

    A drapery assembly is disclosed for covering a framed wall opening, the assembly including drapery panels hung on a horizontal traverse rod, the rod having a pair of master slides and means for displacing the master slides between open and closed positions. A pair of insulating liner panels are positioned behind the drapery, the remote side edges of the liner panels being connected with the side portions of the opening frame, and the adjacent side edges of the liner panels being connected with a pair of vertically arranged center support members adapted for sliding movement longitudinally of a horizontal track member secured to the upper horizontal portion of the opening frame. Pivotally arranged brackets connect the center support members with the master slides of the traverse rod whereby movement of the master slides to effect opening and closing of the drapery panels effects simultaneous opening and closing of the liner panels.

  6. Thermovoltaic semiconductor device including a plasma filter

    DOE Patents [OSTI]

    Baldasaro, Paul F.

    1999-01-01

    A thermovoltaic energy conversion device and related method for converting thermal energy into an electrical potential. An interference filter is provided on a semiconductor thermovoltaic cell to pre-filter black body radiation. The semiconductor thermovoltaic cell includes a P/N junction supported on a substrate which converts incident thermal energy below the semiconductor junction band gap into electrical potential. The semiconductor substrate is doped to provide a plasma filter which reflects back energy having a wavelength which is above the band gap and which is ineffectively filtered by the interference filter, through the P/N junction to the source of radiation thereby avoiding parasitic absorption of the unusable portion of the thermal radiation energy.

  7. Optical panel system including stackable waveguides

    DOE Patents [OSTI]

    DeSanto, Leonard; Veligdan, James T.

    2007-03-06

    An optical panel system including stackable waveguides is provided. The optical panel system displays a projected light image and comprises a plurality of planar optical waveguides in a stacked state. The optical panel system further comprises a support system that aligns and supports the waveguides in the stacked state. In one embodiment, the support system comprises at least one rod, wherein each waveguide contains at least one hole, and wherein each rod is positioned through a corresponding hole in each waveguide. In another embodiment, the support system comprises at least two opposing edge structures having the waveguides positioned therebetween, wherein each opposing edge structure contains a mating surface, wherein opposite edges of each waveguide contain mating surfaces which are complementary to the mating surfaces of the opposing edge structures, and wherein each mating surface of the opposing edge structures engages a corresponding complementary mating surface of the opposite edges of each waveguide.

  8. Optical panel system including stackable waveguides

    DOE Patents [OSTI]

    DeSanto, Leonard; Veligdan, James T.

    2007-11-20

    An optical panel system including stackable waveguides is provided. The optical panel system displays a projected light image and comprises a plurality of planar optical waveguides in a stacked state. The optical panel system further comprises a support system that aligns and supports the waveguides in the stacked state. In one embodiment, the support system comprises at least one rod, wherein each waveguide contains at least one hole, and wherein each rod is positioned through a corresponding hole in each waveguide. In another embodiment, the support system comprises at least two opposing edge structures having the waveguides positioned therebetween, wherein each opposing edge structure contains a mating surface, wherein opposite edges of each waveguide contain mating surfaces which are complementary to the mating surfaces of the opposing edge structures, and wherein each mating surface of the opposing edge structures engages a corresponding complementary mating surface of the opposite edges of each waveguide.

  9. Engine lubrication circuit including two pumps

    DOE Patents [OSTI]

    Lane, William H.

    2006-10-03

    A lubrication pump coupled to the engine is sized such that the it can supply the engine with a predetermined flow volume as soon as the engine reaches a peak torque engine speed. In engines that operate predominately at speeds above the peak torque engine speed, the lubrication pump is often producing lubrication fluid in excess of the predetermined flow volume that is bypassed back to a lubrication fluid source. This arguably results in wasted power. In order to more efficiently lubricate an engine, a lubrication circuit includes a lubrication pump and a variable delivery pump. The lubrication pump is operably coupled to the engine, and the variable delivery pump is in communication with a pump output controller that is operable to vary a lubrication fluid output from the variable delivery pump as a function of at least one of engine speed and lubrication flow volume or system pressure. Thus, the lubrication pump can be sized to produce the predetermined flow volume at a speed range at which the engine predominately operates while the variable delivery pump can supplement lubrication fluid delivery from the lubrication pump at engine speeds below the predominant engine speed range.

  10. One Bacterial Cell, One Complete Genome

    SciTech Connect (OSTI)

    Woyke, Tanja; Tighe, Damon; Mavrommatis, Konstantinos; Clum, Alicia; Copeland, Alex; Schackwitz, Wendy; Lapidus, Alla; Wu, Dongying; McCutcheon, John P.; McDonald, Bradon R.; Moran, Nancy A.; Bristow, James; Cheng, Jan-Fang

    2010-04-26

    While the bulk of the finished microbial genomes sequenced to date are derived from cultured bacterial and archaeal representatives, the vast majority of microorganisms elude current culturing attempts, severely limiting the ability to recover complete or even partial genomes from these environmental species. Single cell genomics is a novel culture-independent approach, which enables access to the genetic material of an individual cell. No single cell genome has to our knowledge been closed and finished to date. Here we report the completed genome from an uncultured single cell of Candidatus Sulcia muelleri DMIN. Digital PCR on single symbiont cells isolated from the bacteriome of the green sharpshooter Draeculacephala minerva bacteriome allowed us to assess that this bacteria is polyploid with genome copies ranging from approximately 200?900 per cell, making it a most suitable target for single cell finishing efforts. For single cell shotgun sequencing, an individual Sulcia cell was isolated and whole genome amplified by multiple displacement amplification (MDA). Sanger-based finishing methods allowed us to close the genome. To verify the correctness of our single cell genome and exclude MDA-derived artifacts, we independently shotgun sequenced and assembled the Sulcia genome from pooled bacteriomes using a metagenomic approach, yielding a nearly identical genome. Four variations we detected appear to be genuine biological differences between the two samples. Comparison of the single cell genome with bacteriome metagenomic sequence data detected two single nucleotide polymorphisms (SNPs), indicating extremely low genetic diversity within a Sulcia population. This study demonstrates the power of single cell genomics to generate a complete, high quality, non-composite reference genome within an environmental sample, which can be used for population genetic analyzes.

  11. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tennessen, S.H. )

    1993-01-01

    This paper reports on 1 of this two-part series overviewed downhole through-flowline (TFL) equipment used with an eccentric Y-block configuration to allow circulation through dual 3 1/2-in. Tubing strings. The subsea completions are in wells located on Saga Petroleum's Subsea Production System template, 6,500 m (21,320 ft) from the Snorre field TLP. This concluding presentation describes the systems control center based on the TLP, from which the remote TFL operations will be conducted. How the system was tested and commissioned before installation is discussed. And basic concepts of Saga's plans for a TFL-operated production logging system are illustrated.

  12. completed-storage | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Projects Completed Natural Gas Storage Projects Click on project number for a more detailed description of the project Project Number Project Name Primary Performer DE-DT0000358 Strategic Petroleum Reserve Northrop Grumman Missions System DE-FC26-03NT41813 Geomechanical Analysis and Design Criteria Terralog Technologies DE-FC26-03NT41779 natural-gas-storage Technology Consortium Pennsylvania State University (PSU) DE-FC26-03NT41743 Improved Deliverability in Gas Storage Fields by

  13. JEA successfully completes world's largest CFB demonstration

    SciTech Connect (OSTI)

    2005-09-30

    JEA (formerly the Jacksonville Electric Authority) has successfully completed an eighth year landmark demonstration project that continues in baseload commercial operation. It scales up atmospheric fluidized-bed technology demonstration to the near-300-MW size, providing important data on a technology that can achieve > 90% SO{sub 2} removal and 60% NOx reduction at relatively high efficiencies and at costs comparable to those of conventional pulverized coal plants. The article recounts the history of the project. Performance tests showed a blend of coal and petcoke were most efficient as a feedstock. 3 figs.

  14. Stimulation Technologies for Deep Well Completions

    SciTech Connect (OSTI)

    Stephen Wolhart

    2005-06-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

  15. Diamond Shamrock nears completion of major expansions

    SciTech Connect (OSTI)

    True, W.R.

    1993-05-24

    With completion later this year of a second refined products line into Colorado, Diamond Shamrock Inc., San Antonio, will have added more than 600 miles of product and crude-oil pipeline on its system and expanded charge and production capacities at its two state-of-the-art refineries, all within 30 months. The projects aim at improving the company's ability to serve markets in the U.S. Southwest and increasing capacities and flexibility at its two refineries. The paper describes these projects under the following headings: new products service; another new line; and refineries, crude pipelines; Three Rivers expansion and Supplies for McKee.

  16. Geopressured geothermal drilling and completions technology development needs

    SciTech Connect (OSTI)

    Maish, A.B.

    1981-03-01

    Geopressured geothermal formations found in the Texas and Louisiana gulf coast region and elsewhere have the potential to supply large quantities of energy in the form of natural gas and warm brine (200 to 300/sup 0/F). Advances are needed, however, in hardware technology, well design technology, and drilling and completion practices to enable production and testing of exploratory wells and to enable economic production of the resource should further development be warranted. This report identifies needed technology for drilling and completing geopressured geothermal source and reinjection wells to reduce the cost and to accelerate commercial recovery of this resource. A comprehensive prioritized list of tasks to develop necessary technology has been prepared. Tasks listed in this report address a wide range of technology needs including new diagnostic techniques, control technologies, hardware, instrumentation, operational procedure guidelines and further research to define failure modes and control techniques. Tasks are organized into the functional areas of well design, drilling, casing installation, cementing, completions, logging, brine reinjection and workovers.

  17. Augmented Fish Health Monitoring; Volume II of II, Completion Report.

    SciTech Connect (OSTI)

    Michak, Patty

    1991-12-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Participating agencies included: Washington Department of Fisheries (WDF), Oregon Department of Fish and Wildlife, Idaho Department of Fish and Game, and the US Fish and Wildlife Service (USFWS). This is the final data report for the Augmented Fish Health Monitoring project. Data collected and sampling results for 1990 and 1991 are presented within this report. An evaluation of this project can be found in Augmented Fish Health Monitoring, Volume 1, Completion Report.'' May, 1991. Pathogen detection methods remained the same from methods described in Augmented Fish Health Monitoring, Annual Report 1989,'' May, 1990. From January 1, 1990 to June 30, 1991 fish health monitoring sampling was conducted. In 1990 21 returning adult stocks were sampled. Juvenile pre-release exams were completed on 20 yearling releases, and 13 sub-yearling releases in 1990. In 1991 17 yearling releases and 11 sub-yearling releases were examined. Midterm sampling was completed on 19 stocks in 1990. Organosomatic analysis was performed at release on index station stocks; Cowlitz spring and fall chinook, Lewis river early coho and Lyons Ferry fall chinook.

  18. Slant hole completion test. Final report

    SciTech Connect (OSTI)

    Mann, R.L.

    1993-07-01

    One of the Department of Energy`s (DOE) Strategies and Objectives in the Natural Gas Program is to conduct activities to transfer technology from R&D programs to potential users. The Slant Hole Completion Test has achieved exactly this objective. The Slant Hole site is essentially the same as the Multiwell site and is located in the southeastern portion of the Piceance Basin near Rifle, Colorado. The Piceance Basin is typical of the Western low permeability basins that contain thick sequences of sands, silts and coals deposited during the Cretaceous period. These sequences contain vast amounts of natural gas but have proven to be resistant to commercial production because of the low permeability of the host rocks. Using the knowledge gained from the DOE`s earlier Multiwell experiment, the SHCT-1 was drilled to demonstrate that by intersecting the natural fractures found in these ``tight rocks,`` commercial gas production can be obtained.

  19. Ionic liquids, electrolyte solutions including the ionic liquids, and energy storage devices including the ionic liquids

    DOE Patents [OSTI]

    Gering, Kevin L.; Harrup, Mason K.; Rollins, Harry W.

    2015-12-08

    An ionic liquid including a phosphazene compound that has a plurality of phosphorus-nitrogen units and at least one pendant group bonded to each phosphorus atom of the plurality of phosphorus-nitrogen units. One pendant group of the at least one pendant group comprises a positively charged pendant group. Additional embodiments of ionic liquids are disclosed, as are electrolyte solutions and energy storage devices including the embodiments of the ionic liquid.

  20. Nevada Proof of Completion of Work (Water Right) | Open Energy...

    Open Energy Info (EERE)

    Proof of Completion of Work (Water Right) Abstract Required notice of completion of diversion works for establishing a water right. Form Type ApplicationNotice Form Topic Proof...

  1. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  2. DOE's New Large Blade Test Facility in Massachusetts Completes...

    Office of Environmental Management (EM)

    DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade ...

  3. Category:Completed Case Study | Open Energy Information

    Open Energy Info (EERE)

    Apps Datasets Community Login | Sign Up Search Category Edit History Category:Completed Case Study Jump to: navigation, search List of geothermal areas that have a completed...

  4. Declaration of Construction Completion and Verification of Readiness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Declaration of Construction Completion and Verification of Readiness to Test Declaration of Construction Completion and Verification of Readiness to Test Salt Waste Processing ...

  5. STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Human Reliability Program (HRP) Alcohol Testing Form (Instructions for completing this form are attached.) STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN A. Employee Name ...

  6. Los Alamos Demolition Work Progresses Toward Goal of Completing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis ...

  7. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated April 2016) Project Construction Photos Completed Projects Current ...

  8. FEMP Completes 2000th Renewable Energy Optimization Screening...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Completes 2000th Renewable Energy Optimization Screening FEMP Completes 2000th Renewable Energy Optimization Screening July 23, 2015 - 12:03pm Addthis REopt models the complex ...

  9. Sandia Energy - Unmanned Aircraft Test Flights Completed at Oliktok...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unmanned Aircraft Test Flights Completed at Oliktok Point Home Climate News News & Events Monitoring Sensing Sensing & Monitoring Unmanned Aircraft Test Flights Completed at...

  10. UTSI/CFFF MHD program completion and related activity

    SciTech Connect (OSTI)

    Dr. Joel W. Muehlhauser; Dr. James N. Chapman

    1999-07-30

    Maintenance work on the DOE CFFF facility and other related government property remained in suspension in accordance with the stop work order issued by DOE. Environmental remediation and preservation of the facility continued. Final actions were completed to dispose of the soil that was contaminated by diesel oil. Actions are underway to dispose of other wastes. Progress is reported on the 5 high temperature superconductivity projects under Task 6. Results are reported for various techniques for annealing cold rolled nickel tapes and applying buffer layer by the Sol-Gel process. Included in the annealing/coating work is one case that involved oxidizing the nickel to nickel oxide which is textured before application of the buffer layer. Work under the Optimum Coated Conductor included issuing a topical report describing the work on grain boundary grooving in nickel substrates as a function of annealing temperature and time. Also, the work to evaluate the mutual effects of adjacent superconductors. In the cost/performance analysis project, completion of a study on the economics of production of coated conductors by the MOCVD process is reported. In the diagnostics for real time process control project, a topical report that outlines the requirements for control of promising manufacturing processes was submitted, additional work is reported on using absorption spectroscopy as the basis for control of the stoichiometry for the MOCVD process and the work on scatterometry for measuring uniformity of surfaces is summarized.

  11. Signaling completion of a message transfer from an origin compute node to a target compute node

    DOE Patents [OSTI]

    Blocksome, Michael A.; Parker, Jeffrey J.

    2011-05-24

    Signaling completion of a message transfer from an origin node to a target node includes: sending, by an origin DMA engine, an RTS message, the RTS message specifying an application message for transfer to the target node from the origin node; receiving, by the origin DMA engine, a remote get message containing a data descriptor for the message and a completion notification descriptor, the completion notification descriptor specifying a local direct put transfer operation for transferring data locally on the origin node; inserting, by the origin DMA engine in an injection FIFO buffer, the data descriptor followed by the completion notification descriptor; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that transfer of the message is complete in dependence upon the completion notification descriptor.

  12. Signaling completion of a message transfer from an origin compute node to a target compute node

    DOE Patents [OSTI]

    Blocksome, Michael A.

    2011-02-15

    Signaling completion of a message transfer from an origin node to a target node includes: sending, by an origin DMA engine, an RTS message, the RTS message specifying an application message for transfer to the target node from the origin node; receiving, by the origin DMA engine, a remote get message containing a data descriptor for the message and a completion notification descriptor, the completion notification descriptor specifying a local memory FIFO data transfer operation for transferring data locally on the origin node; inserting, by the origin DMA engine in an injection FIFO buffer, the data descriptor followed by the completion notification descriptor; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that transfer of the message is complete in dependence upon the completion notification descriptor.

  13. Centrifuge workers study. Phase II, completion report

    SciTech Connect (OSTI)

    Wooten, H.D.

    1994-09-01

    Phase II of the Centrifuge Workers Study was a follow-up to the Phase I efforts. The Phase I results had indicated a higher risk than expected among centrifuge workers for developing bladder cancer when compared with the risk in the general population for developing this same type of cancer. However, no specific agent could be identified as the causative agent for these bladder cancers. As the Phase II Report states, Phase I had been limited to workers who had the greatest potential for exposure to substances used in the centrifuge process. Phase II was designed to expand the survey to evaluate the health of all employees who had ever worked in Centrifuge Program Departments 1330-1339 but who had not been interviewed in Phase I. Employees in analytical laboratories and maintenance departments who provided support services for the Centrifuge Program were also included in Phase II. In December 1989, the Oak Ridge Associated Universities (ORAU), now known as Oak Ridge Institute for Science and Education (ORISE), was contracted to conduct a follow-up study (Phase II). Phase H of the Centrifuge Workers Study expanded the survey to include all former centrifuge workers who were not included in Phase I. ORISE was chosen because they had performed the Phase I tasks and summarized the corresponding survey data therefrom.

  14. Site Transition Process Upon Cleanup Completion | Department of Energy

    Energy Savers [EERE]

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup Completion More Documents & Publications Recommendation 198: Establish a site transition process Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites EM SSAB Conference Calls - January 27, 2011

  15. Project Registration Number Assignments (Completed) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed) Project Registration Number Assignments (Completed) As of: May 2016 Provides a table of Project Registration Number Assignments (Completed) PDF icon Project Registration Number Assignments (Completed) More Documents & Publications All Active DOE Technical Standards Document Project Registration Number Assignments (Active

  16. 309 Facility deactivation and decommisioning Criteria Completion Check Lists

    SciTech Connect (OSTI)

    Cornwell, B.C.

    1996-02-01

    To facilitate and track completion of the 309 Facility turnover criteria completion an Applicability Matrix and Criteria Completion Check Lists were prepared. The applicability matrix documents the required turnover criteria for a given area in the facility or scope of work. The applicable criteria is selected for 16 different areas. For each area a completion checklist is provided to document completion of a requirement by WHC and the Environmental Restoration Contractor.

  17. Geopressured-geothermal well report. Volume I. Drilling and completion

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    Gladys McCall site activities are covered through the completion of the test well and salt water disposal well. The test well was drilled to a total depth of 16,510 feet, then plugged back to 15,831 feet. Three 4'' diameter diamond cores were taken for analysis. An existing well on site, the Getty-Butts Gladys McCall No. 1, was reentered and completed to a depth of 3514 feet as a salt water disposal well. The geologic interpretation of the Gladys McCall site indicated target sands for testing at 15,080 feet through 15, 831 feet. Reservoir fluid temperature at this depth is estimated to be approximately 313/sup 0/F and pressure is estimated to be +-12,800 psi. The preliminary reservoir volume estimate is 3.6 billion barrels of brine. The design wells program includes environmental monitoring of the Gladys McCall site by Louisiana State University. Field stations are set up to monitor surface and ground water quality, subsidence, land loss and shoreline erosion, and seismicity. As of December 31, 1981 the study shows no significant impact on the environment by site operations.

  18. Completion report for well ER-30-1

    SciTech Connect (OSTI)

    1995-12-01

    Well ER-30-1 was drilled for the U.S. Department of Energy (DOE), Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS). IT Corporation (IT) was the principal environmental contractor for the project. The roles and responsibilities of IT and other contractors involved in the project are described in the Raytheon Services Nevada (RSN) Drilling and Completion Programs and the Underground Test Area Operable Unit Project Management Plan. The Well ER-30-1 investigation is part of the DOE`s Underground Test Area (UGTA) Project at the NTS, the goals of which include collecting geological, geophysical, hydrological, and water-chemistry data from new and existing wells to define groundwater migration pathways, rates of migration, and groundwater quality at the NTS. The well will become part of the UGTA monitoring well network.

  19. Site Transition Summary: Cleanup Completion to Long-Term Stewardship at

    Energy Savers [EERE]

    Department of Energy On-going Mission Sites | Department of Energy Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Long-term stewardship (LTS) includes the physical controls, institutions, information, and other mechanisms needed to ensure protection of people and the environment at sites where the U.S. Department of Energy

  20. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  1. NNSA Completes B61 Warhead Refurbishment | National Nuclear Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline NNSA Completes B61 Warhead Refurbishment NNSA Completes B61...

  2. EM Completes Project to Maintain Water Quality of Spent Nuclear...

    Energy Savers [EERE]

    Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site ...

  3. Completing Salt Waste Processing Facility is an EM Priority and...

    Office of Environmental Management (EM)

    Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup Progress Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup ...

  4. NMSLO Affidavit of Completion of ROW Construction | Open Energy...

    Open Energy Info (EERE)

    NMSLO Affidavit of Completion of ROW Construction Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Affidavit of Completion of...

  5. Second Panel of Disposal Rooms Completed in WIPP Underground

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Second Panel of Disposal Rooms Completed in WIPP Underground CARLSBAD, N.M., October 13, ... Crews working in two shifts completed mining Panel 2 weeks ahead of schedule and under ...

  6. NNSA Completes Major Computing Upgrade for Faster Predictions at National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Completes B61 Warhead Refurbishment NNSA Completes B61 Warhead Refurbishment Washington, DC NNSA completed a six-year effort to deliver the first refurbished B61 nuclear bomb. This program will extend the life of the B61 Mod-7 and Mod-11 strategic bombs in the U.S. nuclear weapons stockpile Atmospheric Release Advisory Center | National Nuclear Security Administration

    Completes Major Computing Upgrade for Faster Predictions at National Atmospheric Release Advisory

  7. Apparatus for the concurrent inspection of partially completed welds

    DOE Patents [OSTI]

    Smartt, Herschel B.; Johnson, John A.; Larsen, Eric D.; Bitsoi, Rodney J.; Perrenoud, Ben C.; Miller, Karen S.; Pace, David P.

    2002-01-01

    An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

  8. CompleteProject List.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CompleteProject List.doc� CompleteProject List.doc� PDF icon CompleteProject List.doc� More Documents & Publications Tribal Energy Program February 2012 Award Project Descriptions CX-008525: Categorical Exclusion Determination 2010 Program Review Meeting

  9. Completion Report for Well ER-18-2

    SciTech Connect (OSTI)

    Bechtel Nevada

    2003-09-01

    Well ER-18-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well, located on Buckboard Mesa in the western part of the Nevada Test Site, was drilled in the spring of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to the depth 408.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 762.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 369.7 meters approximately two months after the completion string was installed. One completion string with three isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 15 sidewall samples taken at various depths below 420 meters, supplemented by geophysical log data and results of detailed chemical and mineralogical studies of rock samples. The upper part of the well penetrated Tertiary-age basalt, underlain by tuffaceous moat-filling sediments interbedded with ash-flow tuff units of the Thirsty Canyon Group and the Beatty Wash Formation. The lower half of the drill hole penetrated ash-flow tuff of the mafic-rich Ammonia Tanks Tuff. The geologic interpretation of data from Well ER-18-2 indicates that this site is located inside the structural margin of the Ammonia Tanks caldera.

  10. Completion Report for Well ER-EC-1

    SciTech Connect (OSTI)

    Townsend, M.J.

    2000-12-01

    Well ER-EC-1 was drilled for the U.S. Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the spring of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to the depth 675.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,524.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 566.3 meters prior to installation of the completion string. One completion string with three isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 31 sidewall samples taken at various depths below 680 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well penetrated Tertiary-age lava and tuff of the Timber Mountain Group, the Paintbrush Group, the Calico Hills Formation, the Crater Flat Group, and the Volcanics of Quartz Mountain. The preliminary geologic interpretation of data from Well ER-EC-1 indicates the presence of a structural trough or bench filled with a thick section of post-Rainier Mesa lava. These data also suggest that this site is located on a buried structural ridge that may separate the Silent Canyon and Timber Mountain caldera complexes.

  11. Completion Report for Well ER-EC-2A

    SciTech Connect (OSTI)

    M. J. Townsend

    2002-03-01

    Well ER-EC-2A was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in January and February of 2000 as part of a hydrogeologic investigation program in the Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 412.9 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,516.1 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 228.0 meters, approximately two months after installation of the completion string. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in this report. These are based on composite drill cuttings collected every 3 meters, and 81 sidewall samples taken at various depths below 212 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 30 samples. The well was collared in rhyolite lava and penetrated Tertiary-age lava and tuff of the Volcanics of Fortymile Canyon and the Timber Mountain Group. The preliminary geologic interpretation of borehole data indicates that this well was drilled within the margins of the buried Rainier Mesa and Ammonia Tanks calderas, and that caldera collapse in this area was deeper than expected, resulting in a section of Volcanics of Fortymile Canyon (caldera-filling deposit) that is much thicker than expected.

  12. Completion Report for Well ER-EC-4

    SciTech Connect (OSTI)

    M. J. Townsend

    2000-09-01

    Well ER-EC-4 was drilled for the US Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 263.7 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,062.8 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static, water level was measured at the depth of 228.3 meters, two months after installation of the completion string. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 35 sidewall samples taken at various depths below 286.5 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well was collared in basalt and penetrated Tertiary-age lava and tuff of the Thirsty Canyon Group, the Volcanics of Fortymile Canyon, and the Timber Mountain Group. The preliminary geologic interpretation of data from this well helps pinpoint the location of the western margin of the Timber Mountain caldera complex in the southern Nevada volcanic field.

  13. Completion Report for Well ER-EC-7

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-7 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 265.8 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 422.5 meters. The planned depth of 762 meters was not reached due to borehole stability problems. One completion string with two isolated slotted intervals was installed in the well. A preliminary composite, static, water level was measured at the depth of 227.8 meters, 20 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on composite drill cuttings, supplemented by geophysical log data, and incorporating data from detailed chemical and mineralogical studies of rock samples. Beneath a thin alluvial deposit, the well penetrated 410 meters of lava and bedded tuff of the Volcanics of Fortymile Canyon Group, deposited in the Timber Mountain caldera moat after caldera collapse. The geologic interpretation of data from this well provides information on the thickness, lithologic composition, and hydrogeologic character of moat-filling rocks in the southern portion of the Timber Mountain caldera complex in the southwestern Nevada volcanic field.

  14. Completion report for Well ER-EC-6

    SciTech Connect (OSTI)

    M. J. Townsend

    2000-05-01

    Well ER-EC-6 was drilled for the U.S. Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the spring of 1999 as part of the DOE's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 66-centimeter surface hole was drilled and cased off to the depth of 485.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,524.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 434.6 meters prior to installation of the completion string. One completion string with four isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 33 sidewall samples taken at various depths below 504.4 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well penetrated Tertiary-age lava and tuff of the Timber Mountain Group, the Paintbrush Group, the Calico Hills Formation, and the Volcanics of Quartz Mountain. Intense hydrothermal alteration was observed below the depth of 640 m. The preliminary geologic interpretation indicates that this site may be located on a buried structural ridge that separates the Silent Canyon and Timber Mountain caldera complexes.

  15. Completion Report for Well ER-EC-8

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-8 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 129.8 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 609.6 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 98.4 meters, 24 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on evaluation of composite drill cuttings collected every 3 meters, and 20 sidewall samples taken at various depths below 157.9 meters, supplemented by geophysical log data and results of detailed chemical and mineralogical studies of rock samples. Drilling began in Tertiary-age tuff of the Thirsty Canyon Group, and penetrated tuffs of the Beatty Wash Formation, tuff of Buttonhook Wash, and the upper portion of the Ammonia Tanks Tuff. The geologic interpretation of data from this well helps define the location of the western margin of the Timber Mountain caldera complex in the southwestern Nevada volcanic field. Geologic and hydrologic data from the well will aid in development of models to predict groundwater flow and contaminant migration within and near the Nevada Test Site.

  16. Completion Report for Well ER-EC-5

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-5 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 342.6 meters below ground surface. The borehole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 762.0 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 309.9 meters, 40 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 18 sidewall samples taken at various depths below 349.6 meters, supplemented by geophysical log data and results from detailed chemical and mineralogical analyses of rock samples. The well penetrated Tertiary-age tuffs of the Thirsty Canyon Group, caldera moat-filling sedimentary deposits, lava of the Beatty Wash Formation, and landslide breccia and tuffs of the Timber Mountain Group. The well reached total depth in welded ashflow tuff of the Ammonia Tanks Tuff after penetrating 440.1 meters of this unit, which is also the main water-producing unit in the well. The geologic interpretation of data from this well constrains the western margin of the Ammonia Tanks caldera to the west of the well location.

  17. Nuclear Arms Control R&D Consortium includes Los Alamos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Arms Control R&D Consortium includes Los Alamos Nuclear Arms Control R&D Consortium includes Los Alamos A consortium led by the University of Michigan that includes LANL as ...

  18. Natural Gas Delivered to Consumers in Minnesota (Including Vehicle...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minnesota (Including Vehicle Fuel) (Million Cubic Feet) Natural Gas Delivered to Consumers in Minnesota (Including Vehicle Fuel) (Million Cubic Feet) Year Jan Feb Mar Apr May Jun ...

  19. Trends and challenges when including microstructure in materials...

    Office of Scientific and Technical Information (OSTI)

    Trends and challenges when including microstructure in materials modeling: Examples of ... Title: Trends and challenges when including microstructure in materials modeling: Examples ...

  20. Solar Energy Education. Reader, Part II. Sun story. [Includes...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reader, Part II. Sun story. Includes glossary Citation Details In-Document Search Title: Solar Energy Education. Reader, Part II. Sun story. Includes glossary You are ...

  1. Natural Gas Delivered to Consumers in California (Including Vehicle...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    California (Including Vehicle Fuel) (Million Cubic Feet) Natural Gas Delivered to Consumers in California (Including Vehicle Fuel) (Million Cubic Feet) Year Jan Feb Mar Apr May Jun ...

  2. Microfluidic devices and methods including porous polymer monoliths...

    Office of Scientific and Technical Information (OSTI)

    Microfluidic devices and methods including porous polymer monoliths Citation Details In-Document Search Title: Microfluidic devices and methods including porous polymer monoliths ...

  3. Microfluidic devices and methods including porous polymer monoliths...

    Office of Scientific and Technical Information (OSTI)

    Microfluidic devices and methods including porous polymer monoliths Title: Microfluidic devices and methods including porous polymer monoliths Microfluidic devices and methods ...

  4. Newport News in Review, ch. 47, segment includes TEDF groundbreaking...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsarticlesnewport-news-review-ch-47-segment-includes-tedf-groundbreaking-event Newport News in Review, ch. 47, segment includes TEDF groundbreaking event...

  5. Property:Number of Plants included in Capacity Estimate | Open...

    Open Energy Info (EERE)

    Plants included in Capacity Estimate Jump to: navigation, search Property Name Number of Plants included in Capacity Estimate Property Type Number Retrieved from "http:...

  6. Property:Number of Plants Included in Planned Estimate | Open...

    Open Energy Info (EERE)

    Number of Plants Included in Planned Estimate Jump to: navigation, search Property Name Number of Plants Included in Planned Estimate Property Type String Description Number of...

  7. FEMP Expands ESPC ENABLE Program to Include More Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expands ESPC ENABLE Program to Include More Energy Conservation Measures FEMP Expands ESPC ENABLE Program to Include More Energy Conservation Measures November 13, 2013 - 12:00am...

  8. Should Title 24 Ventilation Requirements Be Amended to include...

    Office of Scientific and Technical Information (OSTI)

    include an Indoor Air Quality Procedure? Citation Details In-Document Search Title: Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure? ...

  9. Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-09-01

    The early production phase of the Dai Hung field development resulted in the drilling and completion of five subsea wells. Because of the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. The downhole completion designs used equipment that was primarily of existing proven design and downhole equipment installation was successfully achieved in a single trip. Ongoing reservoir management will be aided by the use of a subsea wireline system to facilitate data acquisition.

  10. Brief: Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-04-01

    The early production phase of the Dai Hung field development involved drilling and completion of five subsea wells. Owing to the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. Downhole completion designs used equipment that was primarily of existing proven design, and downhole equipment was installed in a single trip. Ongoing reservoir management will be aided by use of a subsea wireline system to facilitate data acquisition.

  11. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in North America. PDF icon Complete LNG Terminal Status Map as of December 2012 More Documents & Publications Summary of LNG Export Applications of the Lower 48 States EA-1942: Finding of No Significant Impact ORDER NO. 3413: Jordan Cove LNG

  12. completed_env_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Solutions Completed Projects All Completed Enviromental Solutions Projects Are Listed Below by Category Produced Water | Federal Lands Access | Regulatory Streamlining | Oil Refining Completed Produced Water Management Projects Project Number Project Name Primary Performer DE-NT0005227 Membrane Technology for Produced Water at Lea County, NM Lea County Government, Lovington, NM DE-FE0000833 An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management

  13. completed_ep_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Exploration and Production Projects All Completed E&P Projects Are Listed Below by Category Exploration Technologies | Reservoir Characterization | Advanced Drilling | Deep Formations Improved Recovery | Tech Transfer | Natural Gas Processing | Low Perm Sandstones | Liquefied Natural Gas | Arctic Resources Completed Exploration Technologies Projects Project Number Project Name Primary Performer DE-FG26-05NT42494 Mapping Alternations caused by Hydrocarbon Microseepages in Patrick

  14. Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Resources to New Mexico | Department of Energy County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on the completion and startup today of the Abiquiu Hydropower Project in New Mexico - the first hydropower project funded by

  15. High power laser workover and completion tools and systems

    SciTech Connect (OSTI)

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2014-10-28

    Workover and completion systems, devices and methods for utilizing 10 kW or more laser energy transmitted deep into the earth with the suppression of associated nonlinear phenomena. Systems and devices for the laser workover and completion of a borehole in the earth. These systems and devices can deliver high power laser energy down a deep borehole, while maintaining the high power to perform laser workover and completion operations in such boreholes deep within the earth.

  16. Innovative Drivetrain Testing for Wind Turbines Nears Completion |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Drivetrain Testing for Wind Turbines Nears Completion Innovative Drivetrain Testing for Wind Turbines Nears Completion March 24, 2016 - 10:14am Addthis NREL researchers are completing testing of a next-generation drivetrain, shown here undergoing rigorous tests at the National Wind Technology Center’s 2.5-megawatt dynamometer. NREL’s testing validates the technology prior to commercialization. Shown here are NREL senior engineer and project lead Jonathan Keller

  17. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |

    Energy Savers [EERE]

    Department of Energy Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it

  18. Department of Energy Announces Completion of World's Largest Laser |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Completion of World's Largest Laser Department of Energy Announces Completion of World's Largest Laser March 31, 2009 - 12:00am Addthis WASHINGTON, DC - The Department of Energy today announced that the National Nuclear Security Administration (NNSA) has certified the completion of the historic effort to build the world's largest laser. Housed at the Department of Energy's Lawrence Livermore National Laboratory, the National Ignition Facility (NIF) is expected to allow

  19. Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Production Sites in Ohio | Department of Energy Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio January 19, 2007 - 9:59am Addthis Over 1,100 Acres in Fernald, Columbus and Ashtabula Restored CROSBY TOWNSHIP, OH - U.S. Secretary of Energy Samuel W. Bodman today certified that environmental cleanup is complete at three former weapons

  20. Secretary Chu Announces Completion of Critical Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Standards | Department of Energy Completion of Critical Energy Conservation Appliance Standards Secretary Chu Announces Completion of Critical Energy Conservation Appliance Standards September 1, 2009 - 12:00am Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today that the Department of Energy has completed energy efficiency standards for a critical group of appliances that will together save up to 1.1 billion metric tons of carbon dioxide once in effect. In

  1. Princeton Plasma Physics Laboratory achieves milestone, completing first

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    part of heart of fusion experiment | Princeton Plasma Physics Lab Princeton Plasma Physics Laboratory achieves milestone, completing first part of heart of fusion experiment By John Greenwald March 22, 2013 Tweet Widget Google Plus One Share on Facebook The completed first section of the NSTX-U center stack. (Photo by Elle Starkman, PPPL Office of Communications) The completed first section of the NSTX-U center stack. Gallery: Related Images: Engineers and technicians at the U.S. Department

  2. Energy Department Completes Cool Roof Installation on DC Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  3. Hampton University Scientists Complete Historic Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Complete Historic Experiment Hampton University Scientists Complete Historic Experiment Two experiments recently completed at the Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility (Jefferson Lab) will put scientists one step closer toward understanding the world we live in. The experiments used Jefferson Lab's high energy accelerator and experimental equipment to produce kaons [pronounced Ka- onz], subatomic particles made of quarks, that have puzzled

  4. AMO Announces Successful Completion of Industrial-Scale Combined Heat,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen, and Power System | Department of Energy Announces Successful Completion of Industrial-Scale Combined Heat, Hydrogen, and Power System AMO Announces Successful Completion of Industrial-Scale Combined Heat, Hydrogen, and Power System May 20, 2015 - 9:00am Addthis Photo Courtesy of FuelCell Energy, Danbury, CT Photo Courtesy of FuelCell Energy, Danbury, CT AMO recently joined with FuelCell Energy of Danbury, CT to celebrate the completion of their successful partnership project at

  5. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    Next-Generation Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation ...

  6. Sandia Energy - SPIDERS Completed Its Phase 1 Operational Demonstratio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grid Integration News & Events Research & Capabilities SMART Grid Energy Assurance Microgrid SPIDERS Completed Its Phase 1 Operational Demonstration in Late January Previous...

  7. Westinghouse Completes its AP1000® Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes its AP1000 Test Stand Last June, CASL launched its first Virtual Environment for Reactor Applications (VERA) Test Stand on the Westinghouse engineering computer ...

  8. Major Milestone: PPPL completes first quadrant of the heart of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preparations and close teamwork. (Photo by Elle Starkman, PPPL Office of Communications) Mission accomplished: The completed first section of the NSTX-U center stack capped months...

  9. Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion...

    Open Energy Info (EERE)

    report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion report Abstract GEOTHERMAL...

  10. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and ...

  11. NNSA Applauds Y-12 for Completing Potable Water Project Ahead...

    National Nuclear Security Administration (NNSA)

    Applauds Y-12 for Completing Potable Water Project Ahead of Schedule and Under Budget | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  12. Transition for Pantex and Y-12 Contract Completed | National...

    National Nuclear Security Administration (NNSA)

    Transition for Pantex and Y-12 Contract Completed | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  13. Microsoft Word - Completion of an Evalution of Impact of Loss...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Completion of an Evaluation of the Impact of the Loss of Two Hydrogen and Methane Monitoring Sampling Lines Dear Mr. Bearzi: As required under Permit Condition...

  14. JOBAID-COMPLETING AN EXTERNAL TRAINING REQUEST (SF-182)

    Broader source: Energy.gov [DOE]

    The purpsoe of this job aid is to guide users through the step-by-step process of completing an external training request form (SF-182).

  15. Going completely renewable: is it possible (let alone desirable)?

    SciTech Connect (OSTI)

    Sovacool, Benjamin K.; Watts, Charmaine

    2009-05-15

    With the right mix of leadership and policy, a completely renewable electricity sector for New Zealand and the United States is feasible, achievable, and desirable. (author)

  16. Completed Projects Table 2015-08-21.xlsx

    Office of Environmental Management (EM)

    Completed Projects 2005-Present Approved Actual Soil and Water Remediation Soil and Water Remediation ANLE-0030 a 28 30 2007 2007 Yes Yes Yes Nuclear Facility Deactivation and...

  17. Coiled tubing completions: An economic discussion of procedures

    SciTech Connect (OSTI)

    Courville, P.W.; Clark, T.R.

    1995-11-01

    The introduction of 2- to 3 {1/2}-in. coiled tubing (CT) sizes provides economical alternative completion opportunities for both new and existing wells. Smaller diameters of CT can also be incorporated into completion designs on existing tubular completions for rigless workovers. This paper will discuss the evaluation method for CT completions in relatively low bottom-hole pressure wells in a non-hostile environment. It will concentrate on two major methods of artificial lift: (1) the use of electric submersible pumps (ESPs) on new wells or (2) the use of gas lift methods to extend the production life of existing wells.

  18. Goodyear Tire Plant Gains Traction on Energy Savings After Completing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment (May 2008) More Documents & Publications Terra Nitrogen Company, L.P.: ...

  19. Project Completion/Closeout Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6A, Project CompletionCloseout Guide by Brian Huizenga Functional areas: Program Management, Program Planning and Management, Project Management The guide provides nonmandatory...

  20. Completion report for Well Cluster ER-20-6

    SciTech Connect (OSTI)

    1998-02-01

    The Well Cluster ER-20-6 drilling and completion project was conducted during February, March, and April of 1996 in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS), Nye County, Nevada. This project is part of the DOE`s Underground Test Area (UGTA) subproject at the NTS. The primary UGTA tasks include collecting geological, geophysical, and hydrological data from new and existing wells to define groundwater quality as well as pathways and rates of groundwater migration at the NTS. A program of drilling wells near the sites of selected underground nuclear tests (near-field drilling) was implemented as part of the UGTA subproject to obtain site-specific data on the nature and extent of migration of radionuclides produced by an underground nuclear explosion. The ER-20-6 near-field drilling project was originally planned to be very similar to that recently conducted at Well Cluster ER-20-5, which was designed to obtain data on the existing hydrologic regime near the site of an underground nuclear explosion (IT, 1995; IT, 1996a). However, after further consideration of the goals of the near-field drilling program and the characteristics of the BULLION site, the TWG recommended that the ER-20-6 project be redesigned to accommodate a forced-gradient experiment. This proposed experiment is expected to yield more realistic estimates of transport parameters than can be deduced from sampling and testing natural groundwater flow systems.

  1. Event-by-event fission simulation code, generates complete fission events

    Energy Science and Technology Software Center (OSTI)

    2013-04-01

    FREYA is a computer code that generates complete fission events. The output includes the energy and momentum of these final state particles: fission products, prompt neutrons and prompt photons. The version of FREYA that is to be released is a module for MCNP6.

  2. Transition for Pantex and Y-12 Contract Completed | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Transition for Pantex and Y-12 Contract Completed July 01, 2014 The National Nuclear Security Administration Production Office and Consolidated Nuclear Security have completed one of the largest and most complex contract transitions in the history of the U.S. Department of Energy. File 2014-07-01

  3. Uranium Processing Facility Site Readiness Subproject Completed on Time and

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Uranium Processing Facility Site Readiness Subproject Completed on Time and Under Budget March 13, 2015 The Uranium Processing Facility (UPF) project celebrates its first major milestone with the completion of site readiness work, delivered on time and under budget. File 2015-03-13

  4. Specialized equipment enabled completions with large coiled tubing

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-02-19

    Specialized equipment enabled successful well completions in Oman with large 3{1/2}-inch coiled tubing. Conventional drilling or completion rigs were not needed. Although the use of 3{1/2}-inch coiled tubing to complete wells is relatively new, it is gaining widespread industry application. One Middle East operating company felt that if downhole completion equipment could be successfully run using coiled tubing, greater cost efficiency, both in initial deployment and in maintenance, could be derived. The paper lists some of the technical considerations for these assumptions. The long-term advantages regarding production and well maintenance cannot yet be determined, but experience in Oman has confirmed the belief that large coiled tubing completions can be technically achieved.

  5. COMPLETION REPORT FOR WELL CLUSTER ER-5-3

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-12-01

    Well Cluster ER-5-3 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This cluster of 3 wells was drilled in 2000 and 2001 as part of a hydrogeologic investigation program in Frenchman Flat. The first borehole in the cluster, Well ER-5-3, was drilled in February and March 2000. A 47.0-centimeter surface hole was drilled and cased off to the depth of 374.8 meters. The hole diameter was decreased to 31.1 centimeters for drilling to a total depth of 794.3 meters within welded ash-flow tuff. A piezometer string with 1 slotted interval was installed in the annulus of the surface casing, open to the saturated alluvium. A completion string with 2 slotted intervals was installed in the main hole, open to saturated alluvium and to the welded tuff aquifer. A second piezometer string with 1 slotted interval open to the welded-tuff aquifer was installed outside the completion string. Well ER-5-3 No.2 was drilled about 30 meters west of the first borehole in March 2000, and was recompleted in March 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 613.8 meters. The hole diameter was decreased to 44.5 centimeters and the borehole was drilled and cased off to the depth of 849.0 meters. The hole diameter was decreased once more to 31.1 centimeters for drilling to a total depth of 1,732.2 meters in dolomite. A completion string open to the dolomite (lower carbonate aquifer) was installed. Well ER-5-3 No.3 was drilled approximately 30 meters north of the first 2 boreholes in February 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 36.6 meters, then the main 25.1-centimeter-diameter hole was drilled to a total depth of 548.6 meters in alluvium. A slotted stainless-steel tubing string was installed in the saturated alluvium. A preliminary composite, static water level was measured at the depth of 282.6 meters, prior to development and hydrologic testing. Detailed lithologic descriptions and stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 120 sidewall samples taken at various depths below 91 meters in Wells ER-5-3 and ER-5-3 No.2, supplemented by geophysical log data. The wells penetrated Quaternary/Tertiary alluvium to the depth of 622.4 meters, and an 8.5-meter-thick basalt flow was encountered within the alluvium. Tertiary tuff was penetrated to the depth of approximately 1,425.9 meters, where the top of the lower carbonate aquifer was tagged in Well ER-5-3 No.2.

  6. Natural Gas Delivered to Consumers in New Mexico (Including Vehicle...

    U.S. Energy Information Administration (EIA) Indexed Site

    Mexico (Including Vehicle Fuel) (Million Cubic Feet) Natural Gas Delivered to Consumers in New Mexico (Including Vehicle Fuel) (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul ...

  7. SWS Online Tool now includes Multifamily Content, plus a How...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SWS Online Tool now includes Multifamily Content, plus a How-To Webinar SWS Online Tool now includes Multifamily Content, plus a How-To Webinar This announcement contains ...

  8. Energy Department Expands Gas Gouging Reporting System to Include...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expands Gas Gouging Reporting System to Include 1-800 Number: 1-800-244-3301 Energy Department Expands Gas Gouging Reporting System to Include 1-800 Number: 1-800-244-3301 ...

  9. Department of Energy Completes Demolition of K-33 Building- Largest Completed Demo Project in Oak Ridge History

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s Oak Ridge Environmental Management (EM) program recently completed its largest demolition project to date. The removal of K-33, a former gaseous diffusion uranium enrichment facility spanning 32-acres, was completed several months ahead of schedule. The American Recovery and Reinvestment Act funded the $51 million project.

  10. Microfluidic devices and methods including porous polymer monoliths

    Office of Scientific and Technical Information (OSTI)

    (Patent) | DOEPatents Microfluidic devices and methods including porous polymer monoliths Title: Microfluidic devices and methods including porous polymer monoliths Microfluidic devices and methods including porous polymer monoliths are described. Polymerization techniques may be used to generate porous polymer monoliths having pores defined by a liquid component of a fluid mixture. The fluid mixture may contain iniferters and the resulting porous polymer monolith may include surfaces

  11. President's FY 2017 Budget Includes $878 Million for Fossil Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs | Department of Energy President's FY 2017 Budget Includes $878 Million for Fossil Energy Programs President's FY 2017 Budget Includes $878 Million for Fossil Energy Programs February 9, 2016 - 2:33pm Addthis President Obama's Fiscal Year (FY) 2017 Budget includes a programmatic level of $878 million for the Office of Fossil Energy (FE), including the use of $240 million in prior year funds, to advance technologies related to the reliable, efficient, affordable and environmentally

  12. Case studies from Oman for coiled tubing deployed completion techniques

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-09-01

    Although the use of ultra-large coiled tubing to complete wells is relatively new, it is gaining widespread industry application. This paper will detail the equipment necessary to perform an operation of this type and will present information from several case studies in Oman in which an operator has successfully deployed completion equipment on 3-1/2-inch-OD coiled tubing. In addition to a discussion of the equipment required to perform the necessary operations, the trial parameters that were established by this operator will be given. The information presented has been selected to allow an initial evaluation to be made of coiled tubing completions in general and will help to determine whether this method can prove to be less expensive than traditional rig-based completions. The topics presented have been chosen to provide the reader with a thorough understanding of the techniques and preparation needed to execute a coiled tubing completion. The summary of experiences will conclude that this innovative completion technique can be a viable method for completing wells. Although long-term advantages regarding production and well maintenance cannot yet be determined, the operator`s experiences to date have confirmed his initial belief that use of coiled tubing in ultra-large continuous-pipe applications can be cost effective.

  13. Calabi-Yau metrics for quotients and complete intersections

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Braun, Volker; Brelidze, Tamaz; Douglas, Michael R.; Ovrut, Burt A.

    2008-05-22

    We extend previous computations of Calabi-Yau metrics on projective hypersurfaces to free quotients, complete intersections, and free quotients of complete intersections. In particular, we construct these metrics on generic quintics, four-generation quotients of the quintic, Schoen Calabi-Yau complete intersections and the quotient of a Schoen manifold with Z₃ x Z₃ fundamental group that was previously used to construct a heterotic standard model. Various numerical investigations into the dependence of Donaldson's algorithm on the integration scheme, as well as on the Kähler and complex structure moduli, are also performed.

  14. Habitat Projects Completed within the Asotin Creek Watershed, 1999 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    2000-01-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington in WRIA 35. According to WDFW's Priority WRIA's by At-Risk Stock Significance Map, it is the highest priority in southeastern WA. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred seventy-six projects have been implemented through the ACMWP as of 1999. Twenty of these projects were funded in part through Bonneville Power Administration's 1999 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; thirty-eight were created with these structures. Three miles of stream benefited from riparian improvements such as vegetative plantings (17,000 trees and shrubs) and noxious weed control. Two sediment basin constructions, 67 acres of grass seeding, and seven hundred forty-five acres of minimum till were implemented to reduce sediment production and delivery to streams in the watershed.

  15. EM's Office of River Protection Completes Waste Retrieval in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "The completion of waste retrieval from another tank is a reflection of the dedicated workforce at the tank farms," said Chris Kemp, deputy federal project director for Tank Farms ...

  16. NNSA celebrates completion of UPF project on time, under budget...

    National Nuclear Security Administration (NNSA)

    readiness subproject at Y-12. The project was completed 20 million under budget, on schedule and work was achieved with more than 600 days without a recordable accident or injury. ...

  17. NNSA Completes its Critical Radar Arming and Fuzing Test for...

    National Nuclear Security Administration (NNSA)

    and Fuzing Test for the W88 ALT 370 September 25, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) recently completed an important test for the W88 ...

  18. Property:NEPA Completion Notes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  19. NNSA Successfully Completes W87 Refurbishment | National Nuclear...

    National Nuclear Security Administration (NNSA)

    NNSA announced the successful completion at the Pantex Plant outside of Amarillo, Texas, of efforts to refurbish the W87 nuclear warhead and extend its life by 30 years. This marks ...

  20. DOE Completes $17 Million Loan Guarantee for New York Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17 Million Loan Guarantee for New York Energy Storage System with Recovery Act Funds DOE Completes 17 Million Loan Guarantee for New York Energy Storage System with Recovery Act ...

  1. Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion...

    Open Energy Info (EERE)

    report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion report Abstract The Raft...

  2. DOE, Washington Closure complete recycling project at Hanford

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The U.S. Department of Energy (DOE) recently teamed with contractor Washington Closure Hanford to complete a major recycling effort during cleanup of the Hanford Site in southeastern Washington State.

  3. SRS Commemorates P & R Reactor Area Completions - SRS Closes...

    Office of Environmental Management (EM)

    Commemorates P & R Reactor Area Completions - SRS Closes the Door on Past Cold War Operations and Opens the Door for Future Missions through Enterprise SRS SRS Commemorates P & R ...

  4. Microsoft Word - HABAdv#226_Central Plateau Completion.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (509) 942-1926 HAB Consensus Advice 226 Subject: Central Plateau Cleanup Completion Strategy Adopted: February 5, 2010 Page 1 February 5, 2010 David Brockman, Manager U.S....

  5. U.S. Geothermal Announces Successful Completion of First Well...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Announces Successful Completion of First Well at Neal Hot Springs Abstract...

  6. U.S. Geothermal Completes Second Successful Production Well at...

    Open Energy Info (EERE)

    Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Completes Second Successful Production Well at Neal Hot Springs Project...

  7. Complete genome sequence of Pedobacter heparinus type strain...

    Office of Scientific and Technical Information (OSTI)

    available data about this species are based on a sole strain that was isolated from dry soil. Here we describe the features of this organism, together with the complete genome...

  8. Completed Recovery Act Project Gives Y-12 New Look

    Broader source: Energy.gov [DOE]

    Y-12 completes Biolody Complex demolition project three months ahead of schedule. The $26.5 million project removed four of the seven buildings from the complex, and it helped modernize the site through much-needed footprint reduction.

  9. Los Alamos County Completes Abiquiu Hydropower Project, Bringing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis ...

  10. Project Reach Completes Photographic Work in Room 7, Panel 7

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photographic Work in Room 7, Panel 7 Photographic work in support of the Accident Investigation Board (AIB) has been completed in Room 7 Panel 7, the location of the February ...

  11. RRC - Geothermal Production Test Completion or Recompletion Report...

    Open Energy Info (EERE)

    Geothermal Production Test Completion or Recompletion Report and Log Form GT-1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RRC - Geothermal Production...

  12. Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin

    Broader source: Energy.gov [DOE]

    The Savannah River Site (SRS) recently cleaned up a 17-acre basin containing coal ash residues from Cold War operations. The American Recovery and Reinvestment Act project was safely completed at a...

  13. Energy Secretary Announces Completion of W62 Dismantlement Program...

    National Nuclear Security Administration (NNSA)

    Energy Secretary Announces Completion of W62 Dismantlement Program August 12, 2010 WASHINGTON, D.C. - U.S. Secretary of Energy Steven Chu announced that the Department of Energy's ...

  14. Program Evaluation: EERE Planned and Completed Evaluations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation » Information Resources » Program Evaluation: EERE Planned and Completed Evaluations Program Evaluation: EERE Planned and Completed Evaluations This section provides a list of past and planned evaluation reports for the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE). Many of the listed reports are available as downloads. The table below tells you which offices have reports accessible as downloads. A checked box in the table -

  15. Waste Treatment Facility Passes Federal Inspection, Completes Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone, Begins Startup | Department of Energy Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup April 23, 2012 - 12:00pm Addthis Media Contact Erik Simpson, 208-390-9464 Danielle Miller, 208-526-5709 The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid

  16. Workers Complete Demolition at Historic Los Alamos Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Workers Complete Demolition at Historic Los Alamos Site Workers Complete Demolition at Historic Los Alamos Site October 7, 2015 - 3:00pm Addthis Workers demolish a former radiologically contaminated warehouse at a historic Los Alamos site. Workers demolish a former radiologically contaminated warehouse at a historic Los Alamos site. The Environmental Management Los Alamos Field Office Federal Integrated Project Team gathers in front of the building known as 21-286 before its

  17. Specificity and completion time distributions of biochemical processes

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: Specificity and completion time distributions of biochemical processes Citation Details In-Document Search Title: Specificity and completion time distributions of biochemical processes In order to produce specific complex structures from a large set of similar biochemical building blocks, many biochemical systems require high sensitivity to small molecular differences. The first and most common mqdel used to explain this high specificity

  18. Specificity and completion time distributions of biochemical processes

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: Specificity and completion time distributions of biochemical processes Citation Details In-Document Search Title: Specificity and completion time distributions of biochemical processes × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information

  19. Brookhaven Lab Completes Decommissioning of Graphite Research Reactor:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reactor core and associated structures successfully removed; waste shipped offsite for disposal | Department of Energy Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal September 1, 2012 - 12:00pm Addthis The

  20. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Budget | National Nuclear Security Administration Nuclear Materials Safeguards and Security Upgrade Project Completed Under Budget April 03, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP) was recently completed approximately $1 million under its original budget of $245 million. NMSSUP upgrades security at Los Alamos National Laboratory's (LANL) Technical Area-55, a facility that houses

  1. Jefferson Lab accelerator upgrade completed: Initial operations set to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begin while experimental equipment upgrades continue | Jefferson Lab accelerator upgrade completed: Initial operations set to begin while experimental equipment upgrades continue Jefferson Lab accelerator upgrade completed: Initial operations set to begin while experimental equipment upgrades continue areial Aerial of Jefferson Lab NEWPORT NEWS, VA, August 12, 2014 - The Department of Energy's Thomas Jefferson National Accelerator Facility ("Jefferson Lab") has just received formal

  2. LANL completes excavation of 1940s waste disposal site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL completes excavation LANL completes excavation of 1940s waste disposal site The excavation removed about 43,000 cubic yards of contaminated debris and soil from the six-acre site. September 22, 2011 Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation. Contact Colleen Curran Communications Office (505) 664-0344 Email LOS ALAMOS, New Mexico, September 22, 2011-Los Alamos

  3. LANL completes high-priority flood and erosion control work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab completes priority erosion controls LANL completes high-priority flood and erosion control work Crews installed 600 feet of water diversion barriers and removed more than 1,200 cubic yards of sediment in anticipation of flash flooding. July 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics

  4. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Energy Savers [EERE]

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  5. Research Portfolio Report Ultra-Deepwater: Drilling and Completion Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ultra-Deepwater: Drilling and Completion Operations Cover images: Photograph of the North Star Imaging M-5000 industrial CT scanner (left) and 3-D renderings of a (10.4 mm) 3 digital subsection of 10% foam quality cement sample (right). Research Portfolio Report Ultra-Deepwater: Drilling and Completion Operations DOE/NETL-2015/1697 Prepared by: Kathy Bruner, Jennifer Funk, and Christine Rueter KeyLogic Systems, Inc. National Energy Technology Laboratory (NETL) Contact: James Ammer

  6. NNSA, LANL Complete DARHT Improvements With Successful Multi-frame

    National Nuclear Security Administration (NNSA)

    Hydrodynamic Test | National Nuclear Security Administration NNSA, LANL Complete DARHT Improvements With Successful Multi-frame Hydrodynamic Test August 10, 2010 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today that Los Alamos National Laboratory's (LANL) Dual Axis Radiographic Hydrodynamic Test (DARHT) facility has completed another successful two axis, multi-frame hydrodynamic test following a period of facility maintenance and several key facility and

  7. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    National Nuclear Security Administration (NNSA)

    Budget | National Nuclear Security Administration Nuclear Materials Safeguards and Security Upgrade Project Completed Under Budget April 03, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP) was recently completed approximately $1 million under its original budget of $245 million. NMSSUP upgrades security at Los Alamos National Laboratory's (LANL) Technical Area-55, a facility that houses

  8. Sandia completes major overhaul of key nuclear weapons test facilities |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Home / Blog Sandia completes major overhaul of key nuclear weapons test facilities Tuesday, May 13, 2014 - 2:46pm Sandia National Laboratories recently completed the renovation of five large-scale test facilities that are crucial to ensuring the safety and reliability of the nation's nuclear weapons systems. The work supports Sandia's ongoing nuclear stockpile modernization work on the B61-12 and W88 Alt, assessments of current stockpile systems, and

  9. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget April 07, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million. SIP upgraded security at Y-12 by replacing existing alarm stations and access control systems with Argus, a

  10. Declaration of Construction Completion and Verification of Readiness to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test | Department of Energy Declaration of Construction Completion and Verification of Readiness to Test Declaration of Construction Completion and Verification of Readiness to Test Salt Waste Processing Facility, Project No. 05-D-405 Pam Marks, FPD, DOE-SR March 2, 2016 File Presentation Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Salt Waste Processing Facility, Construction Turnover to Testing and Commissioning

  11. Certification of Completion of Level-2 Milestone 405: Deploy

    Office of Scientific and Technical Information (OSTI)

    Next-Generation Data Management and Analysis Environment (Technical Report) | SciTech Connect Technical Report: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment This summary report describes data management and visualization activities in the Advanced Simulation and

  12. Kansas City Completes Innovative Business Incubator | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kansas City Completes Innovative Business Incubator Kansas City Completes Innovative Business Incubator The logo for EnergyWorks KC. The Blue Hills Business Center and Contractor Incubator is now open! This Kansas City, Missouri, center has been a collaborative effort between EnergyWorks KC, Greater Kansas City Local Initiatives Support Corporation, Blue Hills Community Services, and the Green Impact Zone. The partners helped transform this once abandoned building on a brownfield site in the

  13. EM's Richland Operations Office Completes Chromium Cleanup along Columbia

    Office of Environmental Management (EM)

    Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals June 29, 2015 - 12:00pm Addthis Once the building was down, heavy equipment operators began “top-down” shearing to safely remove the remaining structure. Demolition debris was then downsized and loaded into rail cars for shipment off site. Once the building was down, heavy equipment operators began "top-down" shearing to safely remove the remaining structure. Demolition debris was then

  14. NNSA's Asset Management Program Completes First Pilot | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration NNSA's Asset Management Program Completes First Pilot December 22, 2015 Asset Management Program implementation team. The National Nuclear Security Administration (NNSA) today announced completion of a $520k pilot to replace a roof, as well as heating, ventilation and cooling (HVAC) system for the Core Library and Data Center at Mercury, Nevada (http://nevada.usgs.gov/mercury/). The library was established as a repository for geologic, hydrologic, and geophysical data

  15. Uranium Processing Facility Site Readiness Subproject Completed on Time and

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Uranium Processing Facility Site Readiness Subproject Completed on Time and Under Budget March 13, 2015 WASHINGTON, D.C.--The Uranium Processing Facility (UPF) project celebrates its first major milestone with the completion of site readiness work, delivered on time and under budget. "UPF is essential to our Nation's uranium mission," said John Eschenberg, UPF Federal Project Director. "Site readiness work sets the

  16. Governor to Join Jefferson Lab in Celebrating Completion of Accelerator

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrade Construction | Jefferson Lab Governor to Join Jefferson Lab in Celebrating Completion of Accelerator Upgrade Construction Governor to Join Jefferson Lab in Celebrating Completion of Accelerator Upgrade Construction CEBAF Race Track This aerial photo shows the outline of the racetrack-shaped CEBAF accelerator at Jefferson Lab in Newport News, Va. NEWPORT NEWS, VA, Sept. 25, 2014 - The Governor of Virginia, Terry McAuliffe, will be the guest speaker at the U.S. Department of Energy's

  17. WIPP Completes State of the Art Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Participants use the new EOC during a recent emergency response drill. The new state-of-the-art EOC improves WIPP's emergency management capabilities. WIPP UPDATE: October 15, 2015 WIPP Completes State of the Art Emergency Operations Center The Waste Isolation Pilot Plant (WIPP) continues to make improvements to the facility's overall emergency response capabilities. Construction was recently completed on a 4,000 square foot, state of the art Emergency Operations Center (EOC). The Skeen-Whitlock

  18. Agencies complete comprehensive investigation for radioactive and hazardous

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    waste landfill Printer-friendly icon Printer-Friendly June 29, 2007 Agencies complete comprehensive investigation for radioactive and hazardous waste landfill; agree to extend document submittal milestone The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (IDEQ), and U.S. Environmental Protection Agency (EPA) have completed a CERCLA (Superfund) Remedial Investigation and Baseline Risk Assessment and Feasibility Study of a radioactive and hazardous waste landfill

  19. VULCAN celebrates completion and develops future plans (Journal Article) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect VULCAN celebrates completion and develops future plans Citation Details In-Document Search Title: VULCAN celebrates completion and develops future plans No abstract prepared. Authors: Ekkebus, Allen E [1] + Show Author Affiliations ORNL Publication Date: 2010-01-01 OSTI Identifier: 988719 DOE Contract Number: DE-AC05-00OR22725 Resource Type: Journal Article Resource Relation: Journal Name: Neutron News; Journal Volume: 21; Journal Issue: 3 Research Org: Oak Ridge National

  20. Percentage of Total Natural Gas Industrial Deliveries included in Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    Pipeline and Distribution Use Price City Gate Price Residential Price Percentage of Total Residential Deliveries included in Prices Commercial Price Percentage of Total Commercial Deliveries included in Prices Industrial Price Percentage of Total Industrial Deliveries included in Prices Vehicle Fuel Price Electric Power Price Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 2010

  1. Percentage of Total Natural Gas Industrial Deliveries included in Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    City Gate Price Residential Price Percentage of Total Residential Deliveries included in Prices Commercial Price Percentage of Total Commercial Deliveries included in Prices Industrial Price Percentage of Total Industrial Deliveries included in Prices Electric Power Price Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 View History U.S.

  2. Percentage of Total Natural Gas Residential Deliveries included in Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    City Gate Price Residential Price Percentage of Total Residential Deliveries included in Prices Commercial Price Percentage of Total Commercial Deliveries included in Prices Industrial Price Percentage of Total Industrial Deliveries included in Prices Electric Power Price Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 View History U.S.

  3. Microfluidic devices and methods including porous polymer monoliths

    Office of Scientific and Technical Information (OSTI)

    (Patent) | SciTech Connect Patent: Microfluidic devices and methods including porous polymer monoliths Citation Details In-Document Search Title: Microfluidic devices and methods including porous polymer monoliths Microfluidic devices and methods including porous polymer monoliths are described. Polymerization techniques may be used to generate porous polymer monoliths having pores defined by a liquid component of a fluid mixture. The fluid mixture may contain iniferters and the resulting

  4. Microfluidic devices and methods including porous polymer monoliths

    Office of Scientific and Technical Information (OSTI)

    (Patent) | SciTech Connect Microfluidic devices and methods including porous polymer monoliths Citation Details In-Document Search Title: Microfluidic devices and methods including porous polymer monoliths Microfluidic devices and methods including porous polymer monoliths are described. Polymerization techniques may be used to generate porous polymer monoliths having pores defined by a liquid component of a fluid mixture. The fluid mixture may contain iniferters and the resulting porous

  5. Percentage of Total Natural Gas Commercial Deliveries included in Prices

    U.S. Energy Information Administration (EIA) Indexed Site

    City Gate Price Residential Price Percentage of Total Residential Deliveries included in Prices Commercial Price Percentage of Total Commercial Deliveries included in Prices Industrial Price Percentage of Total Industrial Deliveries included in Prices Electric Power Price Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 View History U.S.

  6. Dual-completion design for HP/HT corrosive oil well, Villafortuna-Trecate Italy

    SciTech Connect (OSTI)

    Cerruti, S.E.

    1994-12-31

    Villafortuna-Trecate (Italy) oil field is one of the deepest hydrocarbon deposit in production with a reservoir pressure over 15 Ksi, bottom hole temperature in the range of 380 F and corrosive environment due the presence of carbon dioxide and hydrogen sulfide in the production fluids. The design of Villafortuna-Trecate completions requested effort in the selection of appropriate equipment and materials that would enhance the safety, longevity and production capacity of the wells. The paper will discuss the dual completion design outlining the supporting logic and concepts together with the equipment innovations utilized. It includes discussion on tubing material and design, tubing connection, wellhead equipment, completion schemes and related equipment, annulus fluid and displacement technique. Quality control aspects are also discussed. It should serve as a general example of conditions unique to deep, high pressure, high temperature corrosive wells and should be of interest to engineers facing a similar task.

  7. Comparison of Joint Modeling Approaches Including Eulerian Sliding...

    Office of Scientific and Technical Information (OSTI)

    Eulerian Sliding Interfaces Citation Details In-Document Search Title: Comparison of Joint Modeling Approaches Including Eulerian Sliding Interfaces You are accessing a ...

  8. Systematic expansion of porous crystals to include large molecules | Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Gas SeparationsRelevant to Clean Energy Technologies | Blandine Jerome Systematic expansion of porous crystals to include large molecules

  9. Natural Gas Deliveries to Commercial Consumers (Including Vehicle...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    California (Million Cubic Feet) Natural Gas Deliveries to Commercial Consumers (Including Vehicle Fuel through 1996) in California (Million Cubic Feet) Year Jan Feb Mar Apr May Jun ...

  10. METHOD OF FABRICATING ELECTRODES INCLUDING HIGH-CAPACITY, BINDER...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    METHOD OF FABRICATING ELECTRODES INCLUDING HIGH-CAPACITY, BINDER-FREE ANODES FOR LITHIUM-I... Binderless Electrodes for Rechargeable Lithium Batteries Abstract: An electrode (110) is ...

  11. Including Retro-Commissioning in Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Document describes guidance on the importance of (and steps to) including retro-commissioning in federal energy savings performance contracts (ESPCs).

  12. Numerical simulations for low energy nuclear reactions including...

    Office of Scientific and Technical Information (OSTI)

    Numerical simulations for low energy nuclear reactions including direct channels to ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  13. Numerical simulations for low energy nuclear reactions including...

    Office of Scientific and Technical Information (OSTI)

    energy nuclear reactions including direct channels to validate statistical models Citation Details In-Document Search Title: Numerical simulations for low energy nuclear reactions ...

  14. Introduction to Small-Scale Photovoltaic Systems (Including RETScreen...

    Open Energy Info (EERE)

    Photovoltaic Systems (Including RETScreen Case Study) (Webinar) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Introduction to Small-Scale Photovoltaic Systems...

  15. Introduction to Small-Scale Wind Energy Systems (Including RETScreen...

    Open Energy Info (EERE)

    Case Study) (Webinar) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Introduction to Small-Scale Wind Energy Systems (Including RETScreen Case Study) (Webinar) Focus...

  16. DOE Releases Request for Information on Critical Materials, Including...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sector, including fuel cell platinum group metal catalysts. The RFI is soliciting feedback from industry, academia, research laboratories, government agencies, and other ...

  17. SWS Online Tool now includes Multifamily Content, plus a How...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Future updates will include: a how-to video and a Spanish translation of the Standard Work Specifications for Multifamily Housing. Webinar: Using the Standard Work Specifications ...

  18. U-182: Microsoft Windows Includes Some Invalid Certificates

    Broader source: Energy.gov [DOE]

    The operating system includes some invalid intermediate certificates. The vulnerability is due to the certificate authorities and not the operating system itself.

  19. Department of Energy Completes Five Recovery Act Projects- Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

  20. Solar Energy Education. Reader, Part II. Sun story. [Includes glossary

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    Magazine articles which focus on the subject of solar energy are presented. The booklet prepared is the second of a four part series of the Solar Energy Reader. Excerpts from the magazines include the history of solar energy, mythology and tales, and selected poetry on the sun. A glossary of energy related terms is included. (BCS)

  1. Microfluidic devices and methods including porous polymer monoliths

    DOE Patents [OSTI]

    Hatch, Anson V.; Sommer, Gregory J.; Singh, Anup K.; Wang, Ying-Chih; Abhyankar, Vinay

    2015-12-01

    Microfluidic devices and methods including porous polymer monoliths are described. Polymerization techniques may be used to generate porous polymer monoliths having pores defined by a liquid component of a fluid mixture. The fluid mixture may contain iniferters and the resulting porous polymer monolith may include surfaces terminated with iniferter species. Capture molecules may then be grafted to the monolith pores.

  2. Microfluidic devices and methods including porous polymer monoliths

    DOE Patents [OSTI]

    Hatch, Anson V; Sommer, Gregory J; Singh, Anup K; Wang, Ying-Chih; Abhyankar, Vinay V

    2014-04-22

    Microfluidic devices and methods including porous polymer monoliths are described. Polymerization techniques may be used to generate porous polymer monoliths having pores defined by a liquid component of a fluid mixture. The fluid mixture may contain iniferters and the resulting porous polymer monolith may include surfaces terminated with iniferter species. Capture molecules may then be grafted to the monolith pores.

  3. Articles which include chevron film cooling holes, and related processes

    DOE Patents [OSTI]

    Bunker, Ronald Scott; Lacy, Benjamin Paul

    2014-12-09

    An article is described, including an inner surface which can be exposed to a first fluid; an inlet; and an outer surface spaced from the inner surface, which can be exposed to a hotter second fluid. The article further includes at least one row or other pattern of passage holes. Each passage hole includes an inlet bore extending through the substrate from the inlet at the inner surface to a passage hole-exit proximate to the outer surface, with the inlet bore terminating in a chevron outlet adjacent the hole-exit. The chevron outlet includes a pair of wing troughs having a common surface region between them. The common surface region includes a valley which is adjacent the hole-exit; and a plateau adjacent the valley. The article can be an airfoil. Related methods for preparing the passage holes are also described.

  4. Subjective surfaces: a geometric model for boundary completion

    SciTech Connect (OSTI)

    Sarti, Alessandro; Malladi, Ravi; Sethian, J.A.

    2000-06-01

    We present a geometric model and a computational method for segmentation of images with missing boundaries. In many situations, the human visual system fills in missing gaps in edges and boundaries, building and completing information that is not present. Boundary completion presents a considerable challenge in computer vision, since most algorithms attempt to exploit existing data. A large body of work concerns completion models, which postulate how to construct missing data; these models are often trained and specific to particular images. In this paper, we take the following, alternative perspective: we consider a reference point within an image as given, and then develop an algorithm which tries to build missing information on the basis of the given point of view and the available information as boundary data to the algorithm. Starting from this point of view, a surface is constructed. It is then evolved with the mean curvature flow in the metric induced by the image until a piecewise constant solution is reached. We test the computational model on modal completion, amodal completion, texture, photo and medical images. We extend the geometric model and the algorithm to 3D in order to extract shapes from low signal/noise ratio medical volumes. Results in 3D echocardiography and 3D fetal echography are presented.

  5. Turbomachine injection nozzle including a coolant delivery system

    DOE Patents [OSTI]

    Zuo, Baifang (Simpsonville, SC)

    2012-02-14

    An injection nozzle for a turbomachine includes a main body having a first end portion that extends to a second end portion defining an exterior wall having an outer surface. A plurality of fluid delivery tubes extend through the main body. Each of the plurality of fluid delivery tubes includes a first fluid inlet for receiving a first fluid, a second fluid inlet for receiving a second fluid and an outlet. The injection nozzle further includes a coolant delivery system arranged within the main body. The coolant delivery system guides a coolant along at least one of a portion of the exterior wall and around the plurality of fluid delivery tubes.

  6. Natural Gas Delivered to Consumers in Ohio (Including Vehicle...

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural Gas Delivered to Consumers in Ohio (Including Vehicle Fuel) (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 136,340 110,078 102,451 66,525 ...

  7. Natural Gas Deliveries to Commercial Consumers (Including Vehicle...

    U.S. Energy Information Administration (EIA) Indexed Site

    Mexico (Million Cubic Feet) Natural Gas Deliveries to Commercial Consumers (Including Vehicle Fuel through 1996) in New Mexico (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul ...

  8. Removal of mineral matter including pyrite from coal

    DOE Patents [OSTI]

    Reggel, Leslie; Raymond, Raphael; Blaustein, Bernard D.

    1976-11-23

    Mineral matter, including pyrite, is removed from coal by treatment of the coal with aqueous alkali at a temperature of about 175.degree. to 350.degree. C, followed by acidification with strong acid.

  9. T-603: Mac OS X Includes Some Invalid Comodo Certificates

    Broader source: Energy.gov [DOE]

    The operating system includes some invalid certificates. The vulnerability is due to the invalid certificates and not the operating system itself. Other browsers, applications, and operating systems are affected.

  10. What To Include In The Whistleblower Complaint? | National Nuclear...

    National Nuclear Security Administration (NNSA)

    that you have included in your complaint are true and correct to the best of your knowledge and belief; and An affirmation, as described in Sec. 708.13 of this subpart, that...

  11. Including Retro-Commissioning in Federal Energy Savings Performance...

    Energy Savers [EERE]

    the cost of the survey. Developing a detailed scope of work and a fixed price for this work is important to eliminate risk to the Agency and the ESCo. Including a detailed scope...

  12. Example Retro-Commissioning Scope of Work to Include Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Document offers a ...

  13. Complete genome sequence of Cellulomonas flavigena type strain (134T)

    SciTech Connect (OSTI)

    Abt, Birte; Foster, Brian; Lapidus, Alla L.; Clum, Alicia; Sun, Hui; Pukall, Rudiger; Lucas, Susan; Glavina Del Rio, Tijana; Nolan, Matt; Tice, Hope; Cheng, Jan-Fang; Pitluck, Sam; Liolios, Konstantinos; Ivanova, N; Mavromatis, K; Ovchinnikova, Galina; Pati, Amrita; Goodwin, Lynne A.; Chen, Amy; Palaniappan, Krishna; Land, Miriam L; Hauser, Loren John; Chang, Yun-Juan; Jeffries, Cynthia; Rohde, Manfred; Goker, Markus; Woyke, Tanja; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C; Klenk, Hans-Peter

    2010-01-01

    Cellulomonas flavigena (Kellerman and McBeth 1912) Bergey et al. 1923 is the type species of the genus Cellulomonas of the actinobacterial family Cellulomonadaceae. Members of the genus Cellulomonas are of special interest for their ability to degrade cellulose and hemicellulose, particularly with regard to the use of biomass as an alternative energy source. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of a member of the genus Cellulomonas, and next to the human pathogen Tropheryma whipplei the second complete genome sequence within the actinobacterial family Cellulomonadaceae. The 4,123,179 bp long single replicon genome with its 3,735 protein-coding and 53 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  14. Limited Personal Use of Government Office Equipment including Information Technology

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-07

    The Order establishes requirements and assigns responsibilities for employees' limited personal use of Government resources (office equipment and other resources including information technology) within DOE, including NNSA. The Order is required to provide guidance on appropriate and inappropriate uses of Government resources. This Order was certified 04/23/2009 as accurate and continues to be relevant and appropriate for use by the Department. Certified 4-23-09. No cancellation.

  15. Numerical simulations for low energy nuclear reactions including direct

    Office of Scientific and Technical Information (OSTI)

    channels to validate statistical models (Conference) | SciTech Connect Numerical simulations for low energy nuclear reactions including direct channels to validate statistical models Citation Details In-Document Search Title: Numerical simulations for low energy nuclear reactions including direct channels to validate statistical models Authors: Kawano, Toshihiko [1] + Show Author Affiliations Los Alamos National Laboratory [Los Alamos National Laboratory Publication Date: 2014-01-08 OSTI

  16. Comparison of Joint Modeling Approaches Including Eulerian Sliding

    Office of Scientific and Technical Information (OSTI)

    Interfaces (Technical Report) | SciTech Connect Comparison of Joint Modeling Approaches Including Eulerian Sliding Interfaces Citation Details In-Document Search Title: Comparison of Joint Modeling Approaches Including Eulerian Sliding Interfaces Accurate representation of discontinuities such as joints and faults is a key ingredient for high fidelity modeling of shock propagation in geologic media. The following study was done to improve treatment of discontinuities (joints) in the Eulerian

  17. Hybrid powertrain system including smooth shifting automated transmission

    DOE Patents [OSTI]

    Beaty, Kevin D.; Nellums, Richard A.

    2006-10-24

    A powertrain system is provided that includes a prime mover and a change-gear transmission having an input, at least two gear ratios, and an output. The powertrain system also includes a power shunt configured to route power applied to the transmission by one of the input and the output to the other one of the input and the output. A transmission system and a method for facilitating shifting of a transmission system are also provided.

  18. Prevention of Harassment (Including Sexual Harassment) and Retaliation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Statement | Department of Energy Prevention of Harassment (Including Sexual Harassment) and Retaliation Policy Statement Prevention of Harassment (Including Sexual Harassment) and Retaliation Policy Statement DOE Policy for Preventing Harassment in the Workplace PDF icon Harassment Policy July 2011.pdf More Documents & Publications Policy Statement on Equal Employment Opportunity, Harassment, and Retaliation Equal Employment Opportunity and Diversity Policy Statement VWA-0039 - In

  19. Solar Energy Education. Reader, Part II. Sun story. [Includes glossary]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Technical Report) | SciTech Connect Reader, Part II. Sun story. [Includes glossary] Citation Details In-Document Search Title: Solar Energy Education. Reader, Part II. Sun story. [Includes glossary] × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and

  20. Solar Energy Education. Renewable energy: a background text. [Includes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    glossary] (Technical Report) | SciTech Connect energy: a background text. [Includes glossary] Citation Details In-Document Search Title: Solar Energy Education. Renewable energy: a background text. [Includes glossary] × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy

  1. Annual Technology Baseline (Including Supporting Data); NREL (National

    Office of Scientific and Technical Information (OSTI)

    Renewable Energy Laboratory) (Conference) | SciTech Connect SciTech Connect Search Results Conference: Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Citation Details In-Document Search Title: Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory) Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain

  2. Trends and challenges when including microstructure in materials modeling:

    Office of Scientific and Technical Information (OSTI)

    Examples of problems studied at Sandia National Laboratories. (Conference) | SciTech Connect Trends and challenges when including microstructure in materials modeling: Examples of problems studied at Sandia National Laboratories. Citation Details In-Document Search Title: Trends and challenges when including microstructure in materials modeling: Examples of problems studied at Sandia National Laboratories. Abstract not provided. Authors: Dingreville, Remi Philippe Michel Publication Date:

  3. K-25 West Wing Demolition Completed | Department of Energy

    Energy Savers [EERE]

    West Wing Demolition Completed K-25 West Wing Demolition Completed January 28, 2010 - 12:00pm Addthis OAK RIDGE, Tenn. - Thirteen months after demolition began, the final unit of the K-25 Building West Wing was taken down on January 20. Demolition of the 844,000 square foot structure began on December 16, 2008. A significant amount of debris remains to be size-reduced and shipped to the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge, but demolition of the wing is

  4. Celebrating the Completion of the World's Largest Concentrating Solar Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant | Department of Energy the Completion of the World's Largest Concentrating Solar Power Plant Celebrating the Completion of the World's Largest Concentrating Solar Power Plant February 13, 2014 - 9:21am Addthis Aerial view, Ivanpah 1 of 5 Aerial view, Ivanpah An aerial view of the Ivanpah Solar Power Facility at sunrise, with left to right Tower 1, 2 and 3. Image: Gilles Mingasson/Getty Images for Bechtel Harnessing the Power of the Sun 2 of 5 Harnessing the Power of the Sun The top of

  5. Evaluate disposable sample chips and complete the (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Evaluate disposable sample chips and complete the Citation Details In-Document Search Title: Evaluate disposable sample chips and complete the Letter Report detailing plastic sample chip design Authors: Julia Tripp Publication Date: 2013-04-01 OSTI Identifier: 1091352 Report Number(s): INL/EXT-13-28796 DOE Contract Number: DE-AC07-05ID14517 Resource Type: Technical Report Research Org: Idaho National Laboratory (INL) Sponsoring Org: DOE - NE Country of Publication: United

  6. Evaluate disposable sample chips and complete the (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Evaluate disposable sample chips and complete the Citation Details In-Document Search Title: Evaluate disposable sample chips and complete the × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this document is also

  7. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  8. Idaho Workers Complete Last of Transuranic Waste Transfers Funded by

    Office of Environmental Management (EM)

    the Risk along the Columbia River | Department of Energy Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The

  9. DOE Completes Large-Scale Carbon Sequestration Project Awards | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Large-Scale Carbon Sequestration Project Awards DOE Completes Large-Scale Carbon Sequestration Project Awards November 17, 2008 - 4:58pm Addthis Regional Partner to Demonstrate Safe and Permanent Storage of 2 Million Tons of CO2 at Wyoming Site WASHINGTON, DC - Completing a series of awards through its Regional Carbon Sequestration Partnership Program, the U.S. Department of Energy (DOE) today awarded $66.9 million to the Big Sky Regional Carbon Sequestration Partnership for the

  10. Complete genome sequence of Gordonia bronchialis type strain (3410T)

    SciTech Connect (OSTI)

    Ivanova, N; Sikorski, Johannes; Jando, Marlen; Lapidus, Alla L.; Nolan, Matt; Glavina Del Rio, Tijana; Tice, Hope; Copeland, A; Cheng, Jan-Fang; Chen, Feng; Bruce, David; Goodwin, Lynne A.; Pitluck, Sam; Mavromatis, K; Ovchinnikova, Galina; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Land, Miriam L; Hauser, Loren John; Chang, Yun-Juan; Jeffries, Cynthia; Chain, Patrick S. G.; Saunders, Elizabeth H; Han, Cliff; Detter, J C; Brettin, Thomas S; Rohde, Manfred; Goker, Markus; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Klenk, Hans-Peter; Kyrpides, Nikos C

    2010-01-01

    Gordonia bronchialis Tsukamura 1971 is the type species of the genus. G. bronchialis is a human-pathogenic organism that has been isolated from a large variety of human tissues. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first completed genome sequence of the family Gordoniaceae. The 5,290,012 bp long genome with its 4,944 protein-coding and 55 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  11. NSC completes last part to facilitate relocation | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Blog NSC completes last part to facilitate relocation Wednesday, May 28, 2014 - 4:04pm This month, employees at the National Security Campus in Kansas City, Mo., are celebrating the completion of the last "build ahead" part needed to maintain their 99.9 percent on-time delivery record during one of the nation's largest industrial moves. More than 275 unique part numbers encompassing 20,000 components were built in advance to ensure uninterrupted deliveries

  12. Y-12 National Security Complex Completes W69 Dismantlement | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration fieldoffices / Welcome to the NNSA Production Office / NPO News Releases Y-12 National Security Complex Completes W69 Dismantlement February 26, 2016 Click here for a larger image OAK RIDGE, Tenn. -- Dismantlement of W69 canned subassemblies (CSAs) has been completed at the Y-12 National Security Complex. The W69 was the warhead for the short-range attack missile (SRAM) and was retired from the U.S. nuclear stockpile in 1992. The last W69 weapon was dismantled

  13. 2010sr27[cooling_tower_complete].doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Friday, September 17, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 952-6938 paivi.nettamo@srs.gov K Cooling Tower Project Reaches Completion Aiken, S.C. - One of the most visual milestones of cleanup projects underway within the Department of Energy's Office of Environmental Management was the demolition of the K-Reactor Cooling Tower at the Savannah River Site (SRS). Now, this American Recovery and Reinvestment Act project has been completed one month ahead of schedule, with debris

  14. EM's Los Alamos TRU Waste Campaign Heads Toward Completion | Department

    Office of Environmental Management (EM)

    Mercury-Contaminated Soil | Department of Energy Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil EM's Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil July 28, 2015 - 12:00pm Addthis A spider excavator extracts mercury-contaminated soil. A spider excavator extracts mercury-contaminated soil. Workers position a crane above the project site. Workers position a crane above the project site. A waste container is loaded for off-site disposal. A waste

  15. F Reactor Area Cleanup Complete | Department of Energy

    Office of Environmental Management (EM)

    F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete September 19, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated. While six of Hanford's nine plutonium production reactors have been sealed up, or cocooned, the F Reactor Area is the first to

  16. Complete genome sequence of Acidimicrobium ferrooxidans type strain (ICPT)

    SciTech Connect (OSTI)

    Clum, Alicia; Nolan, Matt; Lang, Elke; Glavina Del Rio, Tijana; Tice, Hope; Copeland, Alex; Cheng, Jan-Fang; Lucas, Susan; Chen, Feng; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavrommatis, Konstantinos; Mikhailova, Natalia; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Goker, Markus; Spring, Stefan; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia C.; Chain, Patrick; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter; Lapidus, Alla

    2009-05-20

    Acidimicrobium ferrooxidans (Clark and Norris 1996) is the sole and type species of the genus, which until recently was the only genus within the actinobacterial family Acidimicrobiaceae and in the order Acidomicrobiales. Rapid oxidation of iron pyrite during autotrophic growth in the absence of an enhanced CO2 concentration is characteristic for A. ferrooxidans. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of the order Acidomicrobiales, and the 2,158,157 bp long single replicon genome with its 2038 protein coding and 54 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  17. A model for heterogeneous materials including phase transformations

    SciTech Connect (OSTI)

    Addessio, F.L.; Clements, B.E.; Williams, T.O.

    2005-04-15

    A model is developed for particulate composites, which includes phase transformations in one or all of the constituents. The model is an extension of the method of cells formalism. Representative simulations for a single-phase, brittle particulate (SiC) embedded in a ductile material (Ti), which undergoes a solid-solid phase transformation, are provided. Also, simulations for a tungsten heavy alloy (WHA) are included. In the WHA analyses a particulate composite, composed of tungsten particles embedded in a tungsten-iron-nickel alloy matrix, is modeled. A solid-liquid phase transformation of the matrix material is included in the WHA numerical calculations. The example problems also demonstrate two approaches for generating free energies for the material constituents. Simulations for volumetric compression, uniaxial strain, biaxial strain, and pure shear are used to demonstrate the versatility of the model.

  18. University of Regina researchers complete milestone in major international

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physics project at JLab (University of Regina) | Jefferson Lab researchers complete milestone in major international physics project at JLab (University of Regina) External Link: http://www.uregina.ca/external/communications/releases/current/nr-03232012.html By jlab_admin on Fri, 2012-03-23

  19. EM’s Paducah Site Completes Building Removals

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – EM recently completed demolition of the last of 32 inactive facilities to be removed as part of the cleanup scope that existed before commercial uranium enrichment operations ended at the Paducah Gaseous Diffusion Plant and the plant facilities were returned to DOE.

  20. Complete genome sequences for the anaerobic, extremely thermophilic plant

    Office of Scientific and Technical Information (OSTI)

    biomass-degrading bacteria Caldicellulosiruptor hydrothermalis, Caldicellulosiruptor kristjanssonii, Caldicellulosiruptor kronotskyensis, Caldicellulosiruptor owensenis, and Caldicellulosiruptor lactoaceticus (Journal Article) | SciTech Connect Complete genome sequences for the anaerobic, extremely thermophilic plant biomass-degrading bacteria Caldicellulosiruptor hydrothermalis, Caldicellulosiruptor kristjanssonii, Caldicellulosiruptor kronotskyensis, Caldicellulosiruptor owensenis, and

  1. Reduce completion fluid costs with on-site brine tests

    SciTech Connect (OSTI)

    Thomas, D.C.; Darlington, R.K.; Kinney, W.R.; Lowell, J.L.

    1982-09-01

    A newly developed field kit makes on-site brine completion fluid testing practical. Simple titration procedures are used to analyze brine for calcium, zinc, chloride and bromide with an accuracy and repeatability that compares favorably with expensive laboratory techniques. This article describes the field testing theory and details analytical procedures used.

  2. Solar Energy Education. Renewable energy: a background text. [Includes glossary

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Some of the most common forms of renewable energy are presented in this textbook for students. The topics include solar energy, wind power hydroelectric power, biomass ocean thermal energy, and tidal and geothermal energy. The main emphasis of the text is on the sun and the solar energy that it yields. Discussions on the sun's composition and the relationship between the earth, sun and atmosphere are provided. Insolation, active and passive solar systems, and solar collectors are the subtopics included under solar energy. (BCS)

  3. Metal vapor laser including hot electrodes and integral wick

    DOE Patents [OSTI]

    Ault, E.R.; Alger, T.W.

    1995-03-07

    A metal vapor laser, specifically one utilizing copper vapor, is disclosed herein. This laser utilizes a plasma tube assembly including a thermally insulated plasma tube containing a specific metal, e.g., copper, and a buffer gas therein. The laser also utilizes means including hot electrodes located at opposite ends of the plasma tube for electrically exciting the metal vapor and heating its interior to a sufficiently high temperature to cause the metal contained therein to vaporize and for subjecting the vapor to an electrical discharge excitation in order to lase. The laser also utilizes external wicking arrangements, that is, wicking arrangements located outside the plasma tube. 5 figs.

  4. Metal vapor laser including hot electrodes and integral wick

    DOE Patents [OSTI]

    Ault, Earl R.; Alger, Terry W.

    1995-01-01

    A metal vapor laser, specifically one utilizing copper vapor, is disclosed herein. This laser utilizes a plasma tube assembly including a thermally insulated plasma tube containing a specific metal, e.g., copper, and a buffer gas therein. The laser also utilizes means including hot electrodes located at opposite ends of the plasma tube for electrically exciting the metal vapor and heating its interior to a sufficiently high temperature to cause the metal contained therein to vaporize and for subjecting the vapor to an electrical discharge excitation in order to lase. The laser also utilizes external wicking arrangements, that is, wicking arrangements located outside the plasma tube.

  5. Tunable cavity resonator including a plurality of MEMS beams

    SciTech Connect (OSTI)

    Peroulis, Dimitrios; Fruehling, Adam; Small, Joshua Azariah; Liu, Xiaoguang; Irshad, Wasim; Arif, Muhammad Shoaib

    2015-10-20

    A tunable cavity resonator includes a substrate, a cap structure, and a tuning assembly. The cap structure extends from the substrate, and at least one of the substrate and the cap structure defines a resonator cavity. The tuning assembly is positioned at least partially within the resonator cavity. The tuning assembly includes a plurality of fixed-fixed MEMS beams configured for controllable movement relative to the substrate between an activated position and a deactivated position in order to tune a resonant frequency of the tunable cavity resonator.

  6. DOE Considers Natural Gas Utility Service Options: Proposal Includes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-mile Natural Gas Pipeline from Pasco to Hanford | Department of Energy Considers Natural Gas Utility Service Options: Proposal Includes 30-mile Natural Gas Pipeline from Pasco to Hanford DOE Considers Natural Gas Utility Service Options: Proposal Includes 30-mile Natural Gas Pipeline from Pasco to Hanford January 23, 2012 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE , (509) 376-5365, Cameron.Hardy@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) is considering

  7. Methods of producing adsorption media including a metal oxide

    DOE Patents [OSTI]

    Mann, Nicholas R; Tranter, Troy J

    2014-03-04

    Methods of producing a metal oxide are disclosed. The method comprises dissolving a metal salt in a reaction solvent to form a metal salt/reaction solvent solution. The metal salt is converted to a metal oxide and a caustic solution is added to the metal oxide/reaction solvent solution to adjust the pH of the metal oxide/reaction solvent solution to less than approximately 7.0. The metal oxide is precipitated and recovered. A method of producing adsorption media including the metal oxide is also disclosed, as is a precursor of an active component including particles of a metal oxide.

  8. Thin film solar cell including a spatially modulated intrinsic layer

    DOE Patents [OSTI]

    Guha, Subhendu; Yang, Chi-Chung; Ovshinsky, Stanford R.

    1989-03-28

    One or more thin film solar cells in which the intrinsic layer of substantially amorphous semiconductor alloy material thereof includes at least a first band gap portion and a narrower band gap portion. The band gap of the intrinsic layer is spatially graded through a portion of the bulk thickness, said graded portion including a region removed from the intrinsic layer-dopant layer interfaces. The band gap of the intrinsic layer is always less than the band gap of the doped layers. The gradation of the intrinsic layer is effected such that the open circuit voltage and/or the fill factor of the one or plural solar cell structure is enhanced.

  9. Including environmental concerns in management strategies for depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-12-31

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF{sub 6}) management program. The program is intended to find a long-term management strategy for the DUF{sub 6} that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE`s current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997.

  10. Information regarding previous INCITE awards including selected highlights

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | U.S. DOE Office of Science (SC) Information regarding previous INCITE awards including selected highlights Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities User Facilities Accessing ASCR Facilities Innovative & Novel Computational Impact on Theory & Experiement (INCITE) ASCR Leadership Computing Challenge (ALCC) Industrial Users Computational Science Graduate Fellowship (CSGF) Research & Evaluation Prototypes (REP) Science Highlights Benefits of

  11. cDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, N.V.; Broekaert, W.F.; Namhai Chua; Kush, A.

    1993-02-16

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1,018 nucleotides long and includes an open reading frame of 204 amino acids.

  12. [Article 1 of 7: Motivates and Includes the Consumer]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 of 7: Research on the Characteristics of a Modern Grid by the NETL Modern Grid Strategy Team Accommodates All Generation and Storage Options Last month we presented the first Principal Characteristic of a Modern Grid, "Motivates and Includes the Consumer". This month we present a second characteristic, "Accommodates All Generation and Storage Options". This characteristic will fundamentally transition today's grid from a centralized model for generation to one that also has

  13. [Article 1 of 7: Motivates and Includes the Consumer]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Series on the Seven Principal Characteristics of the Modern Grid [Article 1 of 7: Motivates and Includes the Consumer] In October 2007, Ken Silverstein (Energy Central) wrote an editorial, "Empowering Consumers" that hit a strong, kindred chord with the DOE/National Energy Technology Laboratory (NETL) Modern Grid Strategy team. Through subsequent discussions with Ken and Bill Opalka, Editor- In-Chief, Topics Centers, we decided it would be informative to the industry if the Modern Grid

  14. Evaporative cooler including one or more rotating cooler louvers

    DOE Patents [OSTI]

    Gerlach, David W

    2015-02-03

    An evaporative cooler may include an evaporative cooler housing with a duct extending therethrough, a plurality of cooler louvers with respective porous evaporative cooler pads, and a working fluid source conduit. The cooler louvers are arranged within the duct and rotatably connected to the cooler housing along respective louver axes. The source conduit provides an evaporative cooler working fluid to the cooler pads during at least one mode of operation.

  15. Search for Earth-like planets includes LANL star analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Search Response Team Search Response Team logo NNSA's Search Response Team (SRT) is a national level capability that provides assets for complex search operations using both technical and operational expertise. SRT is a full-response asset, which includes the manpower and equipment to conduct aerial, vehicle, or search operations by foot to locate a potential radiological source. In addition to the field team, a "home team" provides additional support to the field team, and any NNSA

  16. Multi-processor including data flow accelerator module

    DOE Patents [OSTI]

    Davidson, George S.; Pierce, Paul E.

    1990-01-01

    An accelerator module for a data flow computer includes an intelligent memory. The module is added to a multiprocessor arrangement and uses a shared tagged memory architecture in the data flow computer. The intelligent memory module assigns locations for holding data values in correspondence with arcs leading to a node in a data dependency graph. Each primitive computation is associated with a corresponding memory cell, including a number of slots for operands needed to execute a primitive computation, a primitive identifying pointer, and linking slots for distributing the result of the cell computation to other cells requiring that result as an operand. Circuitry is provided for utilizing tag bits to determine automatically when all operands required by a processor are available and for scheduling the primitive for execution in a queue. Each memory cell of the module may be associated with any of the primitives, and the particular primitive to be executed by the processor associated with the cell is identified by providing an index, such as the cell number for the primitive, to the primitive lookup table of starting addresses. The module thus serves to perform functions previously performed by a number of sections of data flow architectures and coexists with conventional shared memory therein. A multiprocessing system including the module operates in a hybrid mode, wherein the same processing modules are used to perform some processing in a sequential mode, under immediate control of an operating system, while performing other processing in a data flow mode.

  17. Electrolytes including fluorinated solvents for use in electrochemical cells

    DOE Patents [OSTI]

    Tikhonov, Konstantin; Yip, Ka Ki; Lin, Tzu-Yuan

    2015-07-07

    Provided are electrochemical cells and electrolytes used to build such cells. The electrolytes include ion-supplying salts and fluorinated solvents capable of maintaining single phase solutions with the salts at between about -30.degree. C. to about 80.degree. C. The fluorinated solvents, such as fluorinated carbonates, fluorinated esters, and fluorinated esters, are less flammable than their non-fluorinated counterparts and increase safety characteristics of cells containing these solvents. The amount of fluorinated solvents in electrolytes may be between about 30% and 80% by weight not accounting weight of the salts. Fluorinated salts, such as fluoroalkyl-substituted LiPF.sub.6, fluoroalkyl-substituted LiBF.sub.4 salts, linear and cyclic imide salts as well as methide salts including fluorinated alkyl groups, may be used due to their solubility in the fluorinated solvents. In some embodiments, the electrolyte may also include a flame retardant, such as a phosphazene or, more specifically, a cyclic phosphazene and/or one or more ionic liquids.

  18. Conversion of geothermal waste to commercial products including silica

    DOE Patents [OSTI]

    Premuzic, Eugene T.; Lin, Mow S.

    2003-01-01

    A process for the treatment of geothermal residue includes contacting the pigmented amorphous silica-containing component with a depigmenting reagent one or more times to depigment the silica and produce a mixture containing depigmented amorphous silica and depigmenting reagent containing pigment material; separating the depigmented amorphous silica and from the depigmenting reagent to yield depigmented amorphous silica. Before or after the depigmenting contacting, the geothermal residue or depigmented silica can be treated with a metal solubilizing agent to produce another mixture containing pigmented or unpigmented amorphous silica-containing component and a solubilized metal-containing component; separating these components from each other to produce an amorphous silica product substantially devoid of metals and at least partially devoid of pigment. The amorphous silica product can be neutralized and thereafter dried at a temperature from about 25.degree. C. to 300.degree. C. The morphology of the silica product can be varied through the process conditions including sequence contacting steps, pH of depigmenting reagent, neutralization and drying conditions to tailor the amorphous silica for commercial use in products including filler for paint, paper, rubber and polymers, and chromatographic material.

  19. Towards a Design of a Complete Solar Water Splitting System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Towards a Design of a Complete Solar Water Splitting System 1 Feb 2013 BISfuel© : A team of Bisfuel researchers led by Devens Gust, Ana Moore and Tom Moore has designed and characterized an artificial photosynthetic reaction center inspired by natural Photosystem II and comprising a highly oxidizing porphyrin linked to a biomimetic electron transfer relay and a porphyrin electron acceptor. Two articles with the results of the study have appeared in September special issue of PNAS "Chemical

  20. Environmental Remediation program completes legacy mercury cleanup near

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smith's Marketplace Stories » Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a high-angle canyon-side cleanup on U.S. Department of Energy property just south of Smith's Marketplace. May 1, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. In ongoing efforts to reduce the

  1. Pantex Wind Farm Complete | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Library / Press Releases Pantex Wind Farm Complete June 18, 2014 Lt. Gen. (Ret.) Frank G. Klotz, Under Secretary for Nuclear Security and Administrator for the National Nuclear Security Administration (NNSA), dedicated the nation's largest federally owned wind farm Tuesday at the Pantex Plant near Amarillo, Texas. Klotz was joined at the ceremony by Kevin Knobloch, DOE's Chief of Staff, NNSA Production Office (NPO) Manager Steven Erhart, Siemens Government Technologies President and CEO Judy

  2. Upgrades Complete at Russian Nuclear Protective Force Training Center |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Upgrades Complete at Russian Nuclear Protective Force Training Center December 12, 2007 NNSA Nonproliferation Head Attends Ceremony MOSCOW - The Department of Energy's National Nuclear Security Administration (NNSA) and the Russian Ministry of Internal Affairs - Internal Troops (MVS-IT) celebrated today the opening of the newly upgraded Lunevo Protective Force Training Center near Moscow. The center, renovated under a successful cost-sharing effort

  3. Coiled tubing enables rapid CO{sub 2} completions

    SciTech Connect (OSTI)

    Payton, R.; Baker, R.; Turner, D.; Bertrand, B.

    1996-08-01

    In the Bravo Dome field of northeastern New Mexico, Amoco has doubled their expected carbon dioxide (CO{sub 2}) production and reduced completion costs by 7.5% using coiled tubing in conjunction with other technologies. Amoco initially expected to produce an average 2.6 MMcfd per well. Instead, six months after completing the 31-well package, the company is producing an average 5.1 MMcfd. Important elements contributing cost and time savings on the project were: Log analysis to select perforations and help prevent water production, and lost circulation; the mobility and flexibility of coiled tubing; using cement for low-cost lost circulation control; using thermoplastic film to prevent proppant flowback; fracture designs optimized for each well; and forming an alliance between Amoco and vendors and developing of mutual trust. Amoco and other producing companies use about 95% of the CO{sub 2} produced at Amoco`s Bravo Dome field for enhanced oil recovery (EOR) projects in the Permian Basin area. Amoco sells 5% of the purest product to companies in the US food industry. While the low price of CO{sub 2}, about one-fourth that of methane, furnished part of the impetus for Amoco to implement the cost-cutting methods at Bravo Dome, the methods can be applied in many completion applications and are discussed in this paper.

  4. A coke oven model including thermal decomposition kinetics of tar

    SciTech Connect (OSTI)

    Munekane, Fuminori; Yamaguchi, Yukio; Tanioka, Seiichi

    1997-12-31

    A new one-dimensional coke oven model has been developed for simulating the amount and the characteristics of by-products such as tar and gas as well as coke. This model consists of both heat transfer and chemical kinetics including thermal decomposition of coal and tar. The chemical kinetics constants are obtained by estimation based on the results of experiments conducted to investigate the thermal decomposition of both coal and tar. The calculation results using the new model are in good agreement with experimental ones.

  5. Composite material including nanocrystals and methods of making

    DOE Patents [OSTI]

    Bawendi, Moungi G.; Sundar, Vikram C.

    2008-02-05

    Temperature-sensing compositions can include an inorganic material, such as a semiconductor nanocrystal. The nanocrystal can be a dependable and accurate indicator of temperature. The intensity of emission of the nanocrystal varies with temperature and can be highly sensitive to surface temperature. The nanocrystals can be processed with a binder to form a matrix, which can be varied by altering the chemical nature of the surface of the nanocrystal. A nanocrystal with a compatibilizing outer layer can be incorporated into a coating formulation and retain its temperature sensitive emissive properties

  6. Composite material including nanocrystals and methods of making

    DOE Patents [OSTI]

    Bawendi, Moungi G.; Sundar, Vikram C.

    2010-04-06

    Temperature-sensing compositions can include an inorganic material, such as a semiconductor nanocrystal. The nanocrystal can be a dependable and accurate indicator of temperature. The intensity of emission of the nanocrystal varies with temperature and can be highly sensitive to surface temperature. The nanocrystals can be processed with a binder to form a matrix, which can be varied by altering the chemical nature of the surface of the nanocrystal. A nanocrystal with a compatibilizing outer layer can be incorporated into a coating formulation and retain its temperature sensitive emissive properties.

  7. NREL: Technology Deployment - Cities-LEAP Energy Profile Tool Includes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Data on More than 23,400 U.S. Cities Cities-LEAP Energy Profile Tool Includes Energy Data on More than 23,400 U.S. Cities News NREL Report Examines Energy Use in Cities and Proposes Next Steps for Energy Innovation Publications Citi-Level Energy Decision Making: Data Use in Energy Planning, Implementation, and Evaluation in U.S. Cities Sponsors DOE's Energy Office of Energy Efficiency and Renewable Energy Policy and Analysis Office Related Stories Hawaii's First Net-Zero Energy

  8. What To Include In The Whistleblower Complaint? | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration To Include In The Whistleblower Complaint? Your complaint does not need to be in any specific form but must be signed by you and contain the following: A statement specifically describing 1. The alleged retaliation taken against you and 2. The disclosure, participation, or refusal that you believe gave rise to the retaliation; A statement that you are not currently pursuing a remedy under State or other applicable law, as described in Sec. 708.15 of this subpart; A statement

  9. cDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, Natasha V.; Broekaert, Willem F.; Chua, Nam-Hai; Kush, Anil

    1993-02-16

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1018 nucleotides long and includes an open reading frame of 204 amino acids. The deduced amino acid sequence contains a pu GOVERNMENT RIGHTS This application was funded under Department of Energy Contract DE-AC02-76ER01338. The U.S. Government has certain rights under this application and any patent issuing thereon.

  10. Composite armor, armor system and vehicle including armor system

    DOE Patents [OSTI]

    Chu, Henry S.; Jones, Warren F.; Lacy, Jeffrey M.; Thinnes, Gary L.

    2013-01-01

    Composite armor panels are disclosed. Each panel comprises a plurality of functional layers comprising at least an outermost layer, an intermediate layer and a base layer. An armor system incorporating armor panels is also disclosed. Armor panels are mounted on carriages movably secured to adjacent rails of a rail system. Each panel may be moved on its associated rail and into partially overlapping relationship with another panel on an adjacent rail for protection against incoming ordnance from various directions. The rail system may be configured as at least a part of a ring, and be disposed about a hatch on a vehicle. Vehicles including an armor system are also disclosed.

  11. Community Assessment Tool for Public Health Emergencies Including Pandemic Influenza

    SciTech Connect (OSTI)

    ORAU's Oak Ridge Institute for Science Education (HCTT-CHE)

    2011-04-14

    The Community Assessment Tool (CAT) for Public Health Emergencies Including Pandemic Influenza (hereafter referred to as the CAT) was developed as a result of feedback received from several communities. These communities participated in workshops focused on influenza pandemic planning and response. The 2008 through 2011 workshops were sponsored by the Centers for Disease Control and Prevention (CDC). Feedback during those workshops indicated the need for a tool that a community can use to assess its readiness for a disaster - readiness from a total healthcare perspective, not just hospitals, but the whole healthcare system. The CAT intends to do just that - help strengthen existing preparedness plans by allowing the healthcare system and other agencies to work together during an influenza pandemic. It helps reveal each core agency partners (sectors) capabilities and resources, and highlights cases of the same vendors being used for resource supplies (e.g., personal protective equipment [PPE] and oxygen) by the partners (e.g., public health departments, clinics, or hospitals). The CAT also addresses gaps in the community's capabilities or potential shortages in resources. This tool has been reviewed by a variety of key subject matter experts from federal, state, and local agencies and organizations. It also has been piloted with various communities that consist of different population sizes, to include large urban to small rural communities.

  12. Complete genome sequence of Haloterrigena turkmenica type strain (4kT)

    SciTech Connect (OSTI)

    Saunders, Elizabeth H; Tindall, Brian; Fahnrich, Regine; Lapidus, Alla L.; Copeland, A; Glavina Del Rio, Tijana; Lucas, Susan; Chen, Feng; Tice, Hope; Cheng, Jan-Fang; Han, Cliff; Detter, J C; Bruce, David; Goodwin, Lynne A.; Chain, Patrick S. G.; Pitluck, Sam; Pati, Amrita; Ivanova, N; Mavromatis, K; Chen, Amy; Palaniappan, Krishna; Land, Miriam L; Hauser, Loren John; Chang, Yun-Juan; Jeffries, Cynthia; Brettin, Tom; Rohde, Manfred; Goker, Markus; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Klenk, Hans-Peter; Kyrpides, Nikos C

    2010-01-01

    Haloterrigena turkmenica (Zvyagintseva and Tarasov 1987) Ventosa et al. 1999, comb. nov. is the type species of the genus Haloterrigena in the euryarchaeal family Halobacteriaceae. It is of phylogenetic interest because of the yet unclear position of the genera Haloterrigena and Natrinema within the Halobacteriaceae, which created some taxonomic problems historically. H. turkmenica, was isolated from sulfate saline soil in Turkmenistan, is a relatively fast growing, chemoorganotrophic, carotenoid-containing, extreme halophile, requiring at least 2 M NaCl for growth. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of the genus Haloterrigena, but the eighth genome sequence from a member of the family Halobacteriaceae. The 5,440,782 bp genome (including six plasmids) with its 5,287 protein-coding and 63 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  13. Combined Pharmacomechanical Thrombolysis of Complete Portomesenteric Thrombosis in a Liver Transplant Recipient

    SciTech Connect (OSTI)

    Lorenz, Jonathan M. Bennett, Shelby; Patel, Jay; Ha, Thuong G. Van; Funaki, Brian

    2013-01-30

    Treatment options for portomesenteric venous thrombosis range from anticoagulation to surgery, depending on chronicity, severity of symptoms, extent of thrombosis, and the availability of local expertise. For acute and subacute cases, a variety of endovascular options have been described in limited published series and case reports, including thrombolysis and mechanical thrombectomy. We report what is to our knowledge the first case in which the Trellis pharmacomechanical thrombolysis device was used successfully to treat complete acute thrombosis of the entire superior mesenteric vein and the entire portal vein with extension into all segmental intrahepatic portal branches in a young adult after liver transplantation. This device, coupled with adjunctive techniques using balloon catheters, facilitated complete restoration of flow, resulting in graft salvage and long-term patency.

  14. Fuel cell repeater unit including frame and separator plate

    DOE Patents [OSTI]

    Yamanis, Jean; Hawkes, Justin R; Chiapetta, Jr., Louis; Bird, Connie E; Sun, Ellen Y; Croteau, Paul F

    2013-11-05

    An example fuel cell repeater includes a separator plate and a frame establishing at least a portion of a flow path that is operative to communicate fuel to or from at least one fuel cell held by the frame relative to the separator plate. The flow path has a perimeter and any fuel within the perimeter flow across the at least one fuel cell in a first direction. The separator plate, the frame, or both establish at least one conduit positioned outside the flow path perimeter. The conduit is outside of the flow path perimeter and is configured to direct flow in a second, different direction. The conduit is fluidly coupled with the flow path.

  15. Nijmegen soft-core potential including two-meson exchange

    SciTech Connect (OSTI)

    Stoks, V.G.J.; Rijken, T.A.

    1995-05-10

    We report on the progress of the construction of the extended soft-core (ESC) Nijmegen potential. Next to the standard one-boson-exchange parts, the model includes the pion-meson-exchange potentials due to the parallel and crossed-box diagrams, as well as the one-pair and two-pair diagrams, vertices for which can be identified with similar interactions appearing in chiral-symmetric Lagrangians. Although the ESC potential is still under construction, it already gives an excellent description of all {ital NN} scattering data below 350 MeV with {chi}{sup 2}/datum=1.3. {copyright} {ital 1995} {ital American} {ital Institute} {ital of} {ital Physics}.

  16. Electra-optical device including a nitrogen containing electrolyte

    DOE Patents [OSTI]

    Bates, John B.; Dudney, Nancy J.; Gruzalski, Greg R.; Luck, Christopher F.

    1995-01-01

    Described is a thin-film battery, especially a thin-film microbattery, and a method for making same having application as a backup or primary integrated power source for electronic devices. The battery includes a novel electrolyte which is electrochemically stable and does not react with the lithium anode and a novel vanadium oxide cathode Configured as a microbattery, the battery can be fabricated directly onto a semiconductor chip, onto the semiconductor die or onto any portion of the chip carrier. The battery can be fabricated to any specified size or shape to meet the requirements of a particular application. The battery is fabricated of solid state materials and is capable of operation between -15.degree. C. and 150.degree. C.

  17. Electra-optical device including a nitrogen containing electrolyte

    DOE Patents [OSTI]

    Bates, J.B.; Dudney, N.J.; Gruzalski, G.R.; Luck, C.F.

    1995-10-03

    Described is a thin-film battery, especially a thin-film microbattery, and a method for making same having application as a backup or primary integrated power source for electronic devices. The battery includes a novel electrolyte which is electrochemically stable and does not react with the lithium anode and a novel vanadium oxide cathode. Configured as a microbattery, the battery can be fabricated directly onto a semiconductor chip, onto the semiconductor die or onto any portion of the chip carrier. The battery can be fabricated to any specified size or shape to meet the requirements of a particular application. The battery is fabricated of solid state materials and is capable of operation between {minus}15 C and 150 C.

  18. Dye laser amplifier including a specifically designed diffuser assembly

    DOE Patents [OSTI]

    Davin, James; Johnston, James P.

    1992-01-01

    A large (high flow rate) dye laser amplifier in which a continuous replened supply of dye is excited by a first light beam, specifically a copper vapor laser beam, in order to amplify the intensity of a second different light beam, specifically a dye beam, passing through the dye is disclosed herein. This amplifier includes a dye cell defining a dye chamber through which a continuous stream of dye is caused to pass at a relatively high flow rate and a specifically designed diffuser assembly for slowing down the flow of dye while, at the same time, assuring that as the dye stream flows through the diffuser assembly it does so in a stable manner.

  19. Hydraulic engine valve actuation system including independent feedback control

    DOE Patents [OSTI]

    Marriott, Craig D

    2013-06-04

    A hydraulic valve actuation assembly may include a housing, a piston, a supply control valve, a closing control valve, and an opening control valve. The housing may define a first fluid chamber, a second fluid chamber, and a third fluid chamber. The piston may be axially secured to an engine valve and located within the first, second and third fluid chambers. The supply control valve may control a hydraulic fluid supply to the piston. The closing control valve may be located between the supply control valve and the second fluid chamber and may control fluid flow from the second fluid chamber to the supply control valve. The opening control valve may be located between the supply control valve and the second fluid chamber and may control fluid flow from the supply control valve to the second fluid chamber.

  20. Actuator assembly including a single axis of rotation locking member

    DOE Patents [OSTI]

    Quitmeyer, James N.; Benson, Dwayne M.; Geck, Kellan P.

    2009-12-08

    An actuator assembly including an actuator housing assembly and a single axis of rotation locking member fixedly attached to a portion of the actuator housing assembly and an external mounting structure. The single axis of rotation locking member restricting rotational movement of the actuator housing assembly about at least one axis. The single axis of rotation locking member is coupled at a first end to the actuator housing assembly about a Y axis and at a 90.degree. angle to an X and Z axis providing rotation of the actuator housing assembly about the Y axis. The single axis of rotation locking member is coupled at a second end to a mounting structure, and more particularly a mounting pin, about an X axis and at a 90.degree. angle to a Y and Z axis providing rotation of the actuator housing assembly about the X axis. The actuator assembly is thereby restricted from rotation about the Z axis.

  1. Copper laser modulator driving assembly including a magnetic compression laser

    DOE Patents [OSTI]

    Cook, Edward G.; Birx, Daniel L.; Ball, Don G.

    1994-01-01

    A laser modulator (10) having a low voltage assembly (12) with a plurality of low voltage modules (14) with first stage magnetic compression circuits (20) and magnetic assist inductors (28) with a common core (91), such that timing of the first stage magnetic switches (30b) is thereby synchronized. A bipolar second stage of magnetic compression (42) is coupled to the low voltage modules (14) through a bipolar pulse transformer (36) and a third stage of magnetic compression (44) is directly coupled to the second stage of magnetic compression (42). The low voltage assembly (12) includes pressurized boxes (117) for improving voltage standoff between the primary winding assemblies (34) and secondary winding (40) contained therein.

  2. Pulse transmission transmitter including a higher order time derivate filter

    DOE Patents [OSTI]

    Dress, Jr., William B.; Smith, Stephen F.

    2003-09-23

    Systems and methods for pulse-transmission low-power communication modes are disclosed. A pulse transmission transmitter includes: a clock; a pseudorandom polynomial generator coupled to the clock, the pseudorandom polynomial generator having a polynomial load input; an exclusive-OR gate coupled to the pseudorandom polynomial generator, the exclusive-OR gate having a serial data input; a programmable delay circuit coupled to both the clock and the exclusive-OR gate; a pulse generator coupled to the programmable delay circuit; and a higher order time derivative filter coupled to the pulse generator. The systems and methods significantly reduce lower-frequency emissions from pulse transmission spread-spectrum communication modes, which reduces potentially harmful interference to existing radio frequency services and users and also simultaneously permit transmission of multiple data bits by utilizing specific pulse shapes.

  3. Insertion of lithium into electrochromic devices after completion

    DOE Patents [OSTI]

    Berland, Brian Spencer; Lanning, Bruce Roy; Frey, Jonathan Mack; Barrett, Kathryn Suzanne; DuPont, Paul Damon; Schaller, Ronald William

    2015-12-22

    The present disclosure describes methods of inserting lithium into an electrochromic device after completion. In the disclosed methods, an ideal amount of lithium can be added post-fabrication to maximize or tailor the free lithium ion density of a layer or the coloration range of a device. Embodiments are directed towards a method to insert lithium into the main device layers of an electrochromic device as a post-processing step after the device has been manufactured. In an embodiment, the methods described are designed to maximize the coloration range while compensating for blind charge loss.

  4. High performance static latches with complete single event upset immunity

    DOE Patents [OSTI]

    Corbett, Wayne T.; Weaver, Harry T.

    1994-01-01

    An asymmetric response latch providing immunity to single event upset without loss of speed. The latch has cross-coupled inverters having a hardened logic state and a soft state, wherein the logic state of the first inverter can only be changed when the voltage on the coupling node of that inverter is low and the logic state of the second inverter can only be changed when the coupling of that inverter is high. One of more of the asymmetric response latches may be configured into a memory cell having complete immunity, which protects information rather than logic states.

  5. ORISE: Completion of environmental characterization at ORNL a Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    success ORISE's completion of environmental characterization at ORNL is a Recovery Act success Exterior of K-33 superstructure at ORNL This 2.8 million-square-foot facility known as K-33 was formerly used to house a uranium-enrichment operation during the Manhattan Project. The superstructure was one of three dozen facilities ORISE characterized under the American Recovery and Reinvestment Act-an effort that proved to be challenging due to the complexity of the facilities and the project's

  6. High performance static latches with complete single event upset immunity

    DOE Patents [OSTI]

    Corbett, W.T.; Weaver, H.T.

    1994-04-26

    An asymmetric response latch providing immunity to single event upset without loss of speed is described. The latch has cross-coupled inverters having a hardened logic state and a soft state, wherein the logic state of the first inverter can only be changed when the voltage on the coupling node of that inverter is low and the logic state of the second inverter can only be changed when the coupling of that inverter is high. One of more of the asymmetric response latches may be configured into a memory cell having complete immunity, which protects information rather than logic states. 5 figures.

  7. Appendix A Lithologic and Monitor Well Completion Logs

    Office of Legacy Management (LM)

    A Lithologic and Monitor Well Completion Logs This page intentionally left blank WELL INSTALLATION BLANK CASING: 1.25 in. Stainless Steel 0.0 to 0.35 METHOD WELL SCREEN: 1.25 in. Stainless Steel 0.35 to 3.27 DATE DEVELOPED SUMPIEND CAP: 1.25 in. Stainless Steel 3.27 to 3.58 WATER LEVEL (FT BGS) SURFACE SEAL: LOGGED BY P. McKenzie REMARKS Drillers hit water at 5 fl: well point removed. LITHOLOGIC DESCRIPTION LOCATION SHIPROCK, NM SURFACE ELEV. ( FT NGVD) 4890.00 SITE SHIPROCK TOP OF CASING (FT)

  8. Coiled tubing buckling implication in drilling and completing horizontal wells

    SciTech Connect (OSTI)

    Wu, J.; Juvkam-Wold, H.C.

    1995-03-01

    This paper discusses coiled tubing buckling and load transmission when drilling and completing horizontal wells. Comprehensive analyses and new equations are presented to predict buckling of coiled tubing, slack-off weight transmission, actual bit weight or packer load, and maximum horizontal length. Coiled tubing lock-up and yield due to buckling are also discussed. These equations can also be used for other coiled tubing operations, such as coiled tubing workover, coiled tubing well stimulation, and even for conventional joint-connected drill strings. Calculations based on the equations presented are also compared with the previous literature.

  9. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup

    Office of Environmental Management (EM)

    14, 2012 AIKEN, S.C. - American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Coun- ties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned

  10. Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin

    Office of Environmental Management (EM)

    Site (SRS) recently cleaned up a 17- acre basin containing coal ash residues from Cold War operations. The American Recovery and Reinvestment Act project was safely completed at a cost of $8.9 million, $2.9 million under budget. The manmade earthen basin received ash from the former R Area Pow- erhouse operations, which ended in 1964. The first of five reactors con- structed at SRS, the R Reactor produced nuclear materials for national defense. Recovery Act funding allowed SRS to accelerate

  11. ORISE: Completion of environmental characterization at ORNL a...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The ORNL characterization work included the collection of 1,120 samples from nuclear reactor coolant water systems, storage tanks, laboratory research facilities, shielded ...

  12. C -parameter distribution at N 3 LL ' including power corrections

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hoang, André H.; Kolodrubetz, Daniel W.; Mateu, Vicent; Stewart, Iain W.

    2015-05-15

    We compute the e⁺e⁻ C-parameter distribution using the soft-collinear effective theory with a resummation to next-to-next-to-next-to-leading-log prime accuracy of the most singular partonic terms. This includes the known fixed-order QCD results up to O(α3s), a numerical determination of the two-loop nonlogarithmic term of the soft function, and all logarithmic terms in the jet and soft functions up to three loops. Our result holds for C in the peak, tail, and far tail regions. Additionally, we treat hadronization effects using a field theoretic nonperturbative soft function, with moments Ωn. To eliminate an O(ΛQCD) renormalon ambiguity in the soft function, we switchmore » from the MS¯ to a short distance “Rgap” scheme to define the leading power correction parameter Ω1. We show how to simultaneously account for running effects in Ω1 due to renormalon subtractions and hadron-mass effects, enabling power correction universality between C-parameter and thrust to be tested in our setup. We discuss in detail the impact of resummation and renormalon subtractions on the convergence. In the relevant fit region for αs(mZ) and Ω1, the perturbative uncertainty in our cross section is ≅ 2.5% at Q=mZ.« less

  13. cDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, N.V.; Broekaert, W.F.; Chua, N.H.; Kush, A.

    1999-05-04

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1018 nucleotides long and includes an open reading frame of 204 amino acids. The deduced amino acid sequence contains a putative signal sequence of 17 amino acid residues followed by a 187 amino acid polypeptide. The amino-terminal region (43 amino acids) is identical to hevein and shows homology to several chitin-binding proteins and to the amino-termini of wound-induced genes in potato and poplar. The carboxyl-terminal portion of the polypeptide (144 amino acids) is 74--79% homologous to the carboxyl-terminal region of wound-inducible genes of potato. Wounding, as well as application of the plant hormones abscisic acid and ethylene, resulted in accumulation of hevein transcripts in leaves, stems and latex, but not in roots, as shown by using the cDNA as a probe. A fusion protein was produced in E. coli from the protein of the present invention and maltose binding protein produced by the E. coli. 12 figs.

  14. CDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, Natasha V.; Broekaert, Willem F.; Chua, Nam-Hai; Kush, Anil

    1995-03-21

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1018 nucleotides long and includes an open reading frame of 204 amino acids. The deduced amino acid sequence contains a putative signal sequence of 17 amino acid residues followed by a 187 amino acid polypeptide. The amino-terminal region (43 amino acids) is identical to hevein and shows homology to several chitin-binding proteins and to the amino-termini of wound-induced genes in potato and poplar. The carboxyl-terminal portion of the polypeptide (144 amino acids) is 74-79% homologous to the carboxyl-terminal region of wound-inducible genes of potato. Wounding, as well as application of the plant hormones abscisic acid and ethylene, resulted in accumulation of hevein transcripts in leaves, stems and latex, but not in roots, as shown by using the cDNA as a probe. A fusion protein was produced in E. coli from the protein of the present invention and maltose binding protein produced by the E. coli.

  15. cDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, Natasha V.; Broekaert, Willem F.; Chua, Nam-Hai; Kush, Anil

    1999-05-04

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1018 nucleotides long and includes an open reading frame of 204 amino acids. The deduced amino acid sequence contains a putative signal sequence of 17 amino acid residues followed by a 187 amino acid polypeptide. The amino-terminal region (43 amino acids) is identical to hevein and shows homology to several chitin-binding proteins and to the amino-termini of wound-induced genes in potato and poplar. The carboxyl-terminal portion of the polypeptide (144 amino acids) is 74-79% homologous to the carboxyl-terminal region of wound-inducible genes of potato. Wounding, as well as application of the plant hormones abscisic acid and ethylene, resulted in accumulation of hevein transcripts in leaves, stems and latex, but not in roots, as shown by using the cDNA as a probe. A fusion protein was produced in E. coli from the protein of the present invention and maltose binding protein produced by the E. coli.

  16. cDNA encoding a polypeptide including a hevein sequence

    DOE Patents [OSTI]

    Raikhel, N.V.; Broekaert, W.F.; Chua, N.H.; Kush, A.

    1995-03-21

    A cDNA clone (HEV1) encoding hevein was isolated via polymerase chain reaction (PCR) using mixed oligonucleotides corresponding to two regions of hevein as primers and a Hevea brasiliensis latex cDNA library as a template. HEV1 is 1,018 nucleotides long and includes an open reading frame of 204 amino acids. The deduced amino acid sequence contains a putative signal sequence of 17 amino acid residues followed by a 187 amino acid polypeptide. The amino-terminal region (43 amino acids) is identical to hevein and shows homology to several chitin-binding proteins and to the amino-termini of wound-induced genes in potato and poplar. The carboxyl-terminal portion of the polypeptide (144 amino acids) is 74--79% homologous to the carboxyl-terminal region of wound-inducible genes of potato. Wounding, as well as application of the plant hormones abscisic acid and ethylene, resulted in accumulation of hevein transcripts in leaves, stems and latex, but not in roots, as shown by using the cDNA as a probe. A fusion protein was produced in E. coli from the protein of the present invention and maltose binding protein produced by the E. coli. 11 figures.

  17. Interim performance criteria for photovoltaic energy systems. [Glossary included

    SciTech Connect (OSTI)

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  18. Extractant composition including crown ether and calixarene extractants

    DOE Patents [OSTI]

    Meikrantz, David H.; Todd, Terry A.; Riddle, Catherine L.; Law, Jack D.; Peterman, Dean R.; Mincher, Bruce J.; McGrath, Christopher A.; Baker, John D.

    2009-04-28

    An extractant composition comprising a mixed extractant solvent consisting of calix[4] arene-bis-(tert-octylbenzo)-crown-6 ("BOBCalixC6"), 4',4',(5')-di-(t-butyldicyclo-hexano)-18-crown-6 ("DtBu18C6"), and at least one modifier dissolved in a diluent. The DtBu18C6 may be present at from approximately 0.01M to approximately 0.4M, such as at from approximately 0.086 M to approximately 0.108 M. The modifier may be 1-(2,2,3,3-tetrafluoropropoxy)-3-(4-sec-butylphenoxy)-2-propanol ("Cs-7SB") and may be present at from approximately 0.01M to approximately 0.8M. In one embodiment, the mixed extractant solvent includes approximately 0.15M DtBu18C6, approximately 0.007M BOBCalixC6, and approximately 0.75M Cs-7SB modifier dissolved in an isoparaffinic hydrocarbon diluent. The extractant composition further comprises an aqueous phase. The mixed extractant solvent may be used to remove cesium and strontium from the aqueous phase.

  19. Complete genome sequence of Actinosynnema mirum type strain (101T)

    SciTech Connect (OSTI)

    Land, Miriam; Lapidus, Alla; Mayilraj, Shanmugam; Chen, Feng; Copeland, Alex; Glavina Del Rio, Tijana; Nolan, Matt; Lucas, Susan; Tice, Hope; Cheng, Jan-Fang; Chertkov, Olga; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Rohde, Manfred; Goker, Markus; Pati, Amrita; Ivanova, Natalia; Mavrommatis, Konstantinos; Chen, Amy; Palaniappan, Krishna; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia; Brettin, Thomas; Detter, John C.; Han, Cliff; Chain, Patrick; Tindall, Brian; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter

    2009-05-20

    Actinosynnema mirum Hasegawa et al. 1978 is the type species of the genus, and is of phylogenetic interest because of its central phylogenetic location in the Actino-synnemataceae, a rapidly growing family within the actinobacterial suborder Pseudo-nocardineae. A. mirum is characterized by its motile spores borne on synnemata and as a producer of nocardicin antibiotics. It is capable of growing aerobically and under a moderate CO2 atmosphere. The strain is a Gram-positive, aerial and substrate mycelium producing bacterium, originally isolated from a grass blade collected from the Raritan River, New Jersey. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first complete genome sequence of a member of the family Actinosynnemataceae, and only the second sequence from the actinobacterial suborder Pseudonocardineae. The 8,248,144 bp long single replicon genome with its 7100 protein-coding and 77 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  20. Complete genome sequence of Desulfomicrobium baculatum type strain (XT)

    SciTech Connect (OSTI)

    Copeland, Alex; Spring, Stefan; Goker, Markus; Schneider, Susanne; Lapidus, Alla; Glavina Del Rio, Tijana; Tice, Hope; Cheng, Jan-Fang; Lucas, Susan; Chen, Feng; Nolan, Matt; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavrommatis, Konstantinos; Ovchinnikova, Galina; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia C; Meincke, Linda; Sims, David; Brettin, Thomas; Detter, John C; Han, Cliff; Chain, Patrick; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Klenk, Hans-Peter; Kyrpides, Nikos C; Lucas, Susan

    2009-05-20

    Desulfomicrobium baculatum is the type species of the genus Desulfomicrobium, which is the type genus of the family Desulfomicrobiaceae. It is of phylogenetic interest because of the isolated location of the family Desulfomicrobiaceae within the order Desulfovibrionales. D. baculatum strain XT is a Gram-negative, motile, sulfate-reducing bacterium isolated from water-saturated manganese carbonate ore. It is strictly anaerobic and does not require NaCl for growth, although NaCl concentrations up to 6percent (w/v) are tolerated. The metabolism is respiratory or fermentative. In the presence of sulfate, pyruvate and lactate are incompletely oxidized to acetate and CO2. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first completed genome sequence of a member of the deltaproteobacterial family Desulfomicrobiaceae, and this 3,942,657 bp long single replicon genome with its 3494 protein-coding and 72 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  1. Community Assessment Tool for Public Health Emergencies Including Pandemic Influenza

    SciTech Connect (OSTI)

    HCTT-CHE

    2011-04-14

    The Community Assessment Tool (CAT) for Public Health Emergencies Including Pandemic Influenza (hereafter referred to as the CAT) was developed as a result of feedback received from several communities. These communities participated in workshops focused on influenza pandemic planning and response. The 2008 through 2011 workshops were sponsored by the Centers for Disease Control and Prevention (CDC). Feedback during those workshops indicated the need for a tool that a community can use to assess its readiness for a disasterreadiness from a total healthcare perspective, not just hospitals, but the whole healthcare system. The CAT intends to do just thathelp strengthen existing preparedness plans by allowing the healthcare system and other agencies to work together during an influenza pandemic. It helps reveal each core agency partners' (sectors) capabilities and resources, and highlights cases of the same vendors being used for resource supplies (e.g., personal protective equipment [PPE] and oxygen) by the partners (e.g., public health departments, clinics, or hospitals). The CAT also addresses gaps in the community's capabilities or potential shortages in resources. While the purpose of the CAT is to further prepare the community for an influenza pandemic, its framework is an extension of the traditional all-hazards approach to planning and preparedness. As such, the information gathered by the tool is useful in preparation for most widespread public health emergencies. This tool is primarily intended for use by those involved in healthcare emergency preparedness (e.g., community planners, community disaster preparedness coordinators, 9-1-1 directors, hospital emergency preparedness coordinators). It is divided into sections based on the core agency partners, which may be involved in the community's influenza pandemic influenza response.

  2. Egypt`s first subsea completion: A Gulf of Suez case history

    SciTech Connect (OSTI)

    El Hawary, A.; Hoffman, J.G.

    1996-06-01

    A case history of the Gulf of Suez Petroleum Co.`s (Gupco) first subsea completion is provided. The first completion was for Well GS 373-2, a previously drilled and tested exploration well located in the south portion of the gulf of Suez. Subsea technology was used to economically justify development of this one-well marginal field, which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low-cost subsea tree was used to capture the resources. In the Gulf of Suez, many fields have been discovered but have not been developed because of low reserves. These marginal projects can have a profound impact on the revenue and shareholder value if an economic method is used to exploit these opportunities. Platform installation was not feasible because of reserve size, hence the well has remained abandoned until recently. This paper presents a summarized look at subsea completion technology. The cost comparison of traditional development methods will be made, given the local cost structure in Egypt. The application of this technology has some limitations and constraints that will be discussed in the paper. Furthermore, the actual field installation of Egypt`s first subsea tree will be summarized. Also included is a discussion on simple remote controls and offshore installation operations.

  3. Microsoft Word - Panel 5 Disposal Operations Complete.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    th re s c th W se lo o s e U.S. D Carls Waste P.O. B Carls CARL hat disposa epository ar hipment wa "All T redit for this heir dedicat Waste Mana The W even dispo ong and can f the 6.2 m igned in 19 With d quivalent o Department bad Field Of e Isolation P Box 3090 bad, New M DOE in P LSBAD, N.M al operation re complete as emplace RU waste m s accomplis tion to perfo agement Pr WIPP unde sal rooms. n hold appr illion cubic 992, has be disposal op of about fou of Energy ffice Pilot Plant

  4. DOE completes demolition of K-31 gaseous diffusion building ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations ceased in 1985, and the site was permanently shut down in 1987. DOE then began cleanup operations, which includes demolition of many of the buildings at the site. The ...

  5. LANL completes excavation of 1940s waste disposal site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    feet deep. Though most of the waste excavated from MDA-B was soil and run-of-the-mill trash, such as cardboard and protective clothing, items uncovered during excavation included...

  6. Los Alamos Lab Completes Excavation of Waste Disposal Site Used...

    Office of Environmental Management (EM)

    up to 35 feet deep. Though most of the waste excavated from MDA-B was soil and general trash like cardboard and protective clothing, items uncovered during excavation included the...

  7. Completing the CCT mission: The challenge of change

    SciTech Connect (OSTI)

    Monk, J.R.

    1997-12-31

    In order to complete the clean coal technology mission it will be necessary to determine CCT`s role in the restructured electricity industry and develop a strategy to promote that role. First, one must understand where the industry is headed and how clean coal technology fits into that future. Then, one needs to develop a strategy for getting from here to there, from where CCT is today to where it must be in five, ten or twenty years to be a viable option for decision-makers. Coal makes sense for the United States for several important reasons, not the least of which is its abundance here. It also makes sense in terms of its economic impact on large areas of the nation. And if coal makes sense, especially economically, then clean coal technology makes even more sense because of its potential to capitalize on this abundant resource in an environmentally friendly manner. But after nearly thirty years of involvement in the political world at all levels from Washington, D.C. to Washington, Indiana, the author has learned the hard way that ``common sense`` does not always, or even often, carry the day in the policymaking process. He believes that the future of clean coal technology hinges on the ability in the next few months and years to mobilize all those who favor that technology to move forward in a cohesive and coordinated effort to affect the policymaking and political process and thereby promote and accelerate CCT development. If this can be done, then the nation will be well on the way to completing the clean coal technology mission and meeting the challenge of change.

  8. Sandia Energy - DOE Completes Construction of State-of-the-Art...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Completes Construction of State-of-the-Art Wind Plant Performance Facility Home Renewable Energy Energy SWIFT Events Partnership Wind Energy News & Events DOE Completes...

  9. Complete Monte Carlo Simulation of Neutron Scattering Experiments

    SciTech Connect (OSTI)

    Drosg, M.

    2011-12-13

    In the far past, it was not possible to accurately correct for the finite geometry and the finite sample size of a neutron scattering set-up. The limited calculation power of the ancient computers as well as the lack of powerful Monte Carlo codes and the limitation in the data base available then prevented a complete simulation of the actual experiment. Using e.g. the Monte Carlo neutron transport code MCNPX [1], neutron scattering experiments can be simulated almost completely with a high degree of precision using a modern PC, which has a computing power that is ten thousand times that of a super computer of the early 1970s. Thus, (better) corrections can also be obtained easily for previous published data provided that these experiments are sufficiently well documented. Better knowledge of reference data (e.g. atomic mass, relativistic correction, and monitor cross sections) further contributes to data improvement. Elastic neutron scattering experiments from liquid samples of the helium isotopes performed around 1970 at LANL happen to be very well documented. Considering that the cryogenic targets are expensive and complicated, it is certainly worthwhile to improve these data by correcting them using this comparatively straightforward method. As two thirds of all differential scattering cross section data of {sup 3}He(n,n){sup 3}He are connected to the LANL data, it became necessary to correct the dependent data measured in Karlsruhe, Germany, as well. A thorough simulation of both the LANL experiments and the Karlsruhe experiment is presented, starting from the neutron production, followed by the interaction in the air, the interaction with the cryostat structure, and finally the scattering medium itself. In addition, scattering from the hydrogen reference sample was simulated. For the LANL data, the multiple scattering corrections are smaller by a factor of five at least, making this work relevant. Even more important are the corrections to the Karlsruhe data due to the inclusion of the missing outgoing self-attenuation that amounts to up to 15%.

  10. DOWNHOLE POWER GENERATION AND WIRELESS COMMUNICATIONS FOR INTELLIGENT COMPLETIONS APPLICATIONS

    SciTech Connect (OSTI)

    Paul Tubel

    2003-07-05

    The third quarter of the project was dedicated to creating the detailed design for the manufacturing of the mechanical system for wireless communications and the power generation module. Another emphasis for the quarter was the development of the surface system and acoustic detector for the downhole tool for 2 way communications. The tasks accomplished during this report period were: (1) All detailed drawings for manufacturing of the wireless communications gauge and power generator were completed and the drawings were forward to a machine shop for manufacturing. (2) The power generator was incorporated to the mandrel of the wireless gauge reducing the length of the tool by 25% and manufacturing cost by about 35%. (3) The new piezoelectric acoustic generator was manufactured successfully and it was delivered during this quarter. The assembly provides a new technique to manufacture large diameter piezoelectric based acoustic generators. (4) The acoustic two-way communications development progressed significantly. The real time firmware for the surface system was developed and the processor was able to detect and process the data frame transmitted from downhole. The analog section of the tool was also developed and it is being tested for filtering capabilities and signal detection and amplification. (5) The new transformer to drive the piezoelectric wafer assembly was designed and manufactured. The transformer has been received and it will go through testing and evaluation during the next quarter.

  11. DOWNHOLE POWER GENERATION AND WIRELESS COMMUNICATIONS FOR INTELLIGENT COMPLETIONS APPLICATIONS

    SciTech Connect (OSTI)

    Paul Tubel

    2003-03-24

    The first quarter of the Downhole Power Generation and Wireless Communications for Intelligent Completions Applications was characterized by the evaluation and determination of the specifications required for the development of the system for permanent applications in wellbores to the optimization of hydrocarbon production. The system will monitor and transmit in real time pressure and temperature information from downhole using the production tubing as the medium for the transmission of the acoustic waves carrying digital information. The most common casing and tubing sizes were determined by interfacing with the major oil companies to obtain information related to their wells. The conceptual design was created for both the wireless gauge section of the tool as well as the power generation module. All hardware for the wireless gauge will be placed in an atmospheric pressure chamber located on the outside of a production tubing with 11.4 centimeter (4-1/2 inch) diameter. This mounting technique will reduce cost as well as the diameter and length of the tool and increase the reliability of the system. The power generator will use piezoelectric wafers to generate electricity based on the flow of hydrocarbons through an area in the wellbore where the tool will be deployed. The goal of the project is to create 1 Watt of power continuously.

  12. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  13. Including shielding effects in application of the TPCA method for detection of embedded radiation sources.

    SciTech Connect (OSTI)

    Johnson, William C.; Shokair, Isaac R.

    2011-12-01

    Conventional full spectrum gamma spectroscopic analysis has the objective of quantitative identification of all the radionuclides present in a measurement. For low-energy resolution detectors such as NaI, when photopeaks alone are not sufficient for complete isotopic identification, such analysis requires template spectra for all the radionuclides present in the measurement. When many radionuclides are present it is difficult to make the correct identification and this process often requires many attempts to obtain a statistically valid solution by highly skilled spectroscopists. A previous report investigated using the targeted principal component analysis method (TPCA) for detection of embedded sources for RPM applications. This method uses spatial/temporal information from multiple spectral measurements to test the hypothesis of the presence of a target spectrum of interest in these measurements without the need to identify all the other radionuclides present. The previous analysis showed that the TPCA method has significant potential for automated detection of target radionuclides of interest, but did not include the effects of shielding. This report complements the previous analysis by including the effects of spectral distortion due to shielding effects for the same problem of detection of embedded sources. Two examples, one with one target radionuclide and the other with two, show that the TPCA method can successfully detect shielded targets in the presence of many other radionuclides. The shielding parameters are determined as part of the optimization process using interpolation of library spectra that are defined on a 2D grid of atomic numbers and areal densities.

  14. Oak Ridge completes field work on Recovery Act-projects

    Broader source: Energy.gov [DOE]

    Oak Ridge's Office of EM has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes.

  15. Egypt`s first remotely controlled subsea completion -- A Gulf of Suez case history

    SciTech Connect (OSTI)

    El Hawary, A.; Hoffman, J.G.

    1995-11-01

    A case history of the Gulf of Suez Petroleum Company`s (GUPCO) first remotely controlled subsea completion is provided. The first completion was for well GS 373-2, a previously drilled and tested exploration well located in the south portion of the Gulf of Suez. Subsea technology was utilized to economically justify development of this one well marginal field which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low cost subsea tree was utilized to capture the resources. In the Gulf of Suez many fields have been discovered by have not been developed due to low reserves. These marginal projects can have a profound impact on the revenue and shareholder value if any economic method is used to exploit these opportunities. Platform installation was not feasible due to reserve size, hence the well has remained abandoned until recently. Capturing the experience of Amoco in the Gulf of Mexico and in the Dutch North Sea, GUPCO was able to build a low cost subsea system which would allow for the economic development of the marginal fields discovered in the past. This paper presents a summarized look at subsea completion technology. The cost comparison of traditional development methods will be made, given the local cost structure in Egypt. The application of this technology has some limitations and constraints which will be discussed in the paper. Furthermore the actual field installation of Egypt`s first remotely controlled subsea tree will be summarized. Also included is a discussion on simple remote controls,and offshore installation operations.

  16. A complete electrical hazard classification system and its application

    SciTech Connect (OSTI)

    Gordon, Lloyd B; Cartelli, Laura

    2009-01-01

    The Standard for Electrical Safety in the Workplace, NFPA 70E, and relevant OSHA electrical safety standards evolved to address the hazards of 60-Hz power that are faced primarily by electricians, linemen, and others performing facility and utility work. This leaves a substantial gap in the management of electrical hazards in Research and Development (R&D) and specialized high voltage and high power equipment. Examples include lasers, accelerators, capacitor banks, electroplating systems, induction and dielectric heating systems, etc. Although all such systems are fed by 50/60 Hz alternating current (ac) power, we find substantial use of direct current (dc) electrical energy, and the use of capacitors, inductors, batteries, and radiofrequency (RF) power. The electrical hazards of these forms of electricity and their systems are different than for 50160 Hz power. Over the past 10 years there has been an effort to develop a method of classifying all of the electrical hazards found in all types of R&D and utilization equipment. Examples of the variation of these hazards from NFPA 70E include (a) high voltage can be harmless, if the available current is sufficiently low, (b) low voltage can be harmful if the available current/power is high, (c) high voltage capacitor hazards are unique and include severe reflex action, affects on the heart, and tissue damage, and (d) arc flash hazard analysis for dc and capacitor systems are not provided in existing standards. This work has led to a comprehensive electrical hazard classification system that is based on various research conducted over the past 100 years, on analysis of such systems in R&D, and on decades of experience. Initially, national electrical safety codes required the qualified worker only to know the source voltage to determine the shock hazard. Later, as arc flash hazards were understood, the fault current and clearing time were needed. These items are still insufficient to fully characterize all types of electrical hazards. The new comprehensive electrical hazard classification system uses a combination of voltage, shock current available, fault current available, power, energy, and waveform to classify all forms of electrical hazards. Based on this electrical hazard classification system, many new tools have been developed, including (a) work controls for these hazards, (b) better selection of PPE for R&D work, (c) improved training, and (d) a new Severity Ranking Tool that is used to rank electrical accidents and incidents with various forms of electrical energy.

  17. SHELS: A complete galaxy redshift survey with R ? 20.6

    SciTech Connect (OSTI)

    Geller, Margaret J.; Hwang, Ho Seong; Fabricant, Daniel G.; Kurtz, Michael J.; Dell'Antonio, Ian P.; Zahid, Harus Jabran E-mail: hhwang@cfa.harvard.edu E-mail: mkurtz@cfa.harvard.edu E-mail: jabran@ifa.hawaii.edu

    2014-08-01

    The SHELS (Smithsonian Hectospec Lensing Survey) is a complete redshift survey covering two well-separated fields (F1 and F2) of the Deep Lens Survey to a limiting R = 20.6. Here we describe the redshift survey of the F2 field (R.A.{sub 2000} = 09{sup h}19{sup m}32.4 and decl.{sub 2000} = +3000'00''). The survey includes 16,294 new redshifts measured with the Hectospec on the MMT. The resulting survey of the 4deg{sup 2} F2 field is 95% complete to R = 20.6, currently the densest survey to this magnitude limit. The median survey redshift is z = 0.3; the survey provides a view of structure in the range 0.1 ? z ? 0.6. An animation displays the large-scale structure in the survey region. We provide a redshift, spectral index D {sub n}4000, and stellar mass for each galaxy in the survey. We also provide a metallicity for each galaxy in the range 0.2

  18. Covariant spectator theory for the electromagnetic three-nucleon form factors: Complete impulse approximation

    SciTech Connect (OSTI)

    Alexandre Pinto, S ergio; Stadler, Alfred; Gross, Franz

    2009-01-01

    We present the first calculations of the electromagnetic form factors of 3He and 3H within the framework of the Covariant Spectator Theory (CST). This first exploratory study concentrates on the sensitivity of the form factors to the strength of the scalar meson-nucleon off-shell coupling, known from previous studies to have a strong influence on the three-body binding energy. Results presented here were obtained using the complete impulse approximation (CIA), which includes contributions of relativistic origin that appear as two-body corrections in a non-relativistic framework, such as ?Z-graphs?, but omits other two and three-body currents. We compare our results to non-relativistic calculations augmented by relativistic corrections of O(v/c)2.

  19. Covariant spectator theory for the electromagnetic three-nucleon form factors: Complete impulse approximation

    SciTech Connect (OSTI)

    Sergio Alexandre Pinto, Alfred Stadler, Franz Gross

    2009-05-01

    We present the first calculations of the electromagnetic form factors of 3He and 3H within the framework of the Covariant Spectator Theory (CST). This first exploratory study concentrates on the sensitivity of the form factors to the strength of the scalar meson-nucleon off-shell coupling, known from previous studies to have a strong influence on the three-body binding energy. Results presented here were obtained using the complete impulse approximation (CIA), which includes contributions of relativistic origin that appear as two-body corrections in a non-relativistic framework, such as #28;Z-graphs#29;, but omits other two and three-body currents. We compare our results to non-relativistic calculations augmented by relativistic corrections of O(v/c)2.

  20. Covariant spectator theory for the electromagnetic three-nucleon form factors: Complete impulse approximation

    SciTech Connect (OSTI)

    Pinto, Sergio Alexandre; Stadler, Alfred; Gross, Franz

    2009-05-15

    We present the first calculations of the electromagnetic form factors of {sup 3}He and {sup 3}H within the framework of the Covariant Spectator Theory (CST). This first exploratory study concentrates on the sensitivity of the form factors to the strength of the scalar meson-nucleon off-shell coupling, known from previous studies to have a strong influence on the three-body binding energy. Results presented here were obtained using the complete impulse approximation (CIA), which includes contributions of relativistic origin that appear as two-body corrections in a nonrelativistic framework, such as 'Z-graphs', but omits other two and three-body currents. We compare our results to nonrelativistic calculations augmented by relativistic corrections of O(v/c){sup 2}.

  1. RDI's Wisdom Way Solar Village Final Report: Includes Utility Bill Analysis of Occupied Homes

    SciTech Connect (OSTI)

    Robb Aldrich, Steven Winter Associates

    2011-07-01

    In 2010, Rural Development, Inc. (RDI) completed construction of Wisdom Way Solar Village (WWSV), a community of ten duplexes (20 homes) in Greenfield, MA. RDI was committed to very low energy use from the beginning of the design process throughout construction. Key features include: 1. Careful site plan so that all homes have solar access (for active and passive); 2. Cellulose insulation providing R-40 walls, R-50 ceiling, and R-40 floors; 3. Triple-pane windows; 4. Airtight construction (~0.1 CFM50/ft2 enclosure area); 5. Solar water heating systems with tankless, gas, auxiliary heaters; 6. PV systems (2.8 or 3.4kWSTC); 7. 2-4 bedrooms, 1,100-1,700 ft2. The design heating loads in the homes were so small that each home is heated with a single, sealed-combustion, natural gas room heater. The cost savings from the simple HVAC systems made possible the tremendous investments in the homes' envelopes. The Consortium for Advanced Residential Buildings (CARB) monitored temperatures and comfort in several homes during the winter of 2009-2010. In the Spring of 2011, CARB obtained utility bill information from 13 occupied homes. Because of efficient lights, appliances, and conscientious home occupants, the energy generated by the solar electric systems exceeded the electric energy used in most homes. Most homes, in fact, had a net credit from the electric utility over the course of a year. On the natural gas side, total gas costs averaged $377 per year (for heating, water heating, cooking, and clothes drying). Total energy costs were even less - $337 per year, including all utility fees. The highest annual energy bill for any home evaluated was $458; the lowest was $171.

  2. A three-colour graph as acomplete topological invariant for gradient-like diffeomorphisms of surfaces

    SciTech Connect (OSTI)

    Grines, V Z; Pochinka, O V; Kapkaeva, S Kh

    2014-10-31

    In apaper of Oshemkov and Sharko, three-colour graphs were used to make the topological equivalence of Morse-Smale flows on surfaces obtained by Peixoto more precise. In the present paper, in the language of three-colour graphs equipped with automorphisms, we obtain acomplete (including realization) topological classification of gradient-like cascades on surfaces. Bibliography: 25 titles.

  3. The complete mitochondrial genome of a gecko and the phylogeneticposition of the Middle Eastern teratoscincus keyserlingii

    SciTech Connect (OSTI)

    Macey, J. Robert; Fong, Jonathan J.; Kuehl, Jennifer V.; Shafiei,Soheila; Ananjeva, Natalia B.; Papenfuss, Theodore J.; Boore, Jeffrey L.

    2005-04-22

    Sqamate reptiles are traditionally divided into six groups: Iguania, Anguimorpha, Scincomorpha, Gekkota (these four are lizards), Serpentes (snakes), and Amphisbaenia (the so-called worm lizards). Currently there are complete mitochondrial genomes from two representatives of the Iguania (Janke et al., 2001; Kumazawa, 2004), three from the Anguimorpha (Kumazawa, 2004; Kumazawa and Endo, 2004), two from the Scincomorpha (Kumazawa and Nishida, 1999; Kumazawa, 2004), two from Serpentes (Kumazawa et al., 1998; Kumazawa, 2004) and 12 from Amphisbaenia (Macey et al., 2004). The only traditional group of Squamata from which a complete mitochondrial genome has not been sequenced is the Gekkota. Here we report the complete mitochondrial genome of Teratoscincus keyserlingii, a Middle Eastern representative of the Gekkota. The gekkonid lizard genus Teratoscincus is distributed throughout the deserts of central and southwest Asia as shown in figure 1, with five species currently recognized (Macey et al. 1997a, 1999b). Included in this figure are the positions of mountain ranges discussed in the text; see also figure 1 in Macey et al. (1999b). Two species, T. bedriagai and T. microlepis, are restricted to Southwest Asia south of the Kopet Dagh and Hindu Kush in Iran, Afghanistan, and Pakistan (Anderson, 1999). Two species are found in the deserts of western China and Mongolia, with T. przewalskii occurring in the Taklimakan and lowland Gobi deserts, and T. roborowskii restricted to the Turpan Depression. The fifth species, T. scincus, is sometimes considered to be restricted to the Caspian Basin in Kazakhstan, Kyrgyzistan, Tadjikistan, Turkmenistan and Uzbekistan. Alternatively, Teratoscincus populations in Southwest Asia, primarily on the Iranian Plateau, situated directly north of the Arabian Plate, are sometimes considered to be a subspecies of T. scincus or, otherwise, to constitute a sixth species, T. keyserlingii. Macey et al. (1999b) assessed the phylogenetic relationships of four Teratoscincus species with mitochondrial DNA sequences from a {approx}1800 base-pair segment spanning from nad1 to cox1. Phylogenetic analysis places T. microlepis in a basal position to a clade containing T. scincus, T. przewalskii and T. roborowskii, with the later two as sister taxa. This phylogenetic arrangement suggests that tectonic plate movements in Southwest Asia and western China due to the Indian and Arabian collisions caused speciation among Teratoscincus species. No molecular phylogenetic study has included the putative species T. keyserlingii.

  4. Completion Report for Well Cluster ER-6-1

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well Cluster ER-6-1 was constructed for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Division at the Nevada Test Site, Nye County, Nevada. This work was initiated as part of the Groundwater Characterization Project, now known as the Underground Test Area Project. The well cluster is located in southeastern Yucca Flat. Detailed lithologic descriptions with stratigraphic assignments for Well Cluster ER-6-1 are included in this report. These are based on composite drill cuttings collected every 3 meters and conventional core samples taken below 639 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 11 samples to resolve complex interrelationships between several of the Tertiary tuff units. Additionally, paleontological analyses by the U.S. Geological Survey confirmed the stratigraphic assignments below 539 meters within the Paleozoic sedimentary section. All three wells in the Well ER-6-1 cluster were drilled within the Quaternary and Tertiary alluvium section, the Tertiary volcanic section, and into the Paleozoic sedimentary section.

  5. Completion Report for Well ER-8-1

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-11-01

    Well ER-8-1 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in October and November of 2002 as part of a Hydrogeologic investigation program for the Yucca Flat/Climax Mine Corrective Action Unit in the northeastern portion of the Nevada Test Site. Well ER-8-1 is located at the north end of Yucca Flat approximately 580 meters south-southeast of the surface exposure of the Climax granitic intrusive. Detailed lithologic descriptions with stratigraphic assignments are included in this report. These are based on composite drill cuttings samples collected every 3 meters, and 21 sidewall samples taken at various depths between 351.1 and 573.0 meters, supplemented by incomplete geophysical log data. Detailed petrographic, geochemical, and mineralogical studies of rock samples were conducted on 22 samples of drill cuttings. Drilling began in tuffaceous alluvium, and the borehole penetrated Tertiary age bedded tuffs of the Volcanics of Oak Spring Butte and carbonate sediments of Paleozoic age, which were encountered at a depth of 334 meters. The borehole unexpectedly penetrated granite at the depth of 538.9 meters in which drilling was stopped. Contact metamorphic rocks and intrusive dikes associated with the Cretaceous-age granitic intrusive and at least one significant fault zone were encountered.

  6. Completion Report for Well ER-2-1

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-2-1 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (formerly Nevada Operations Office), in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in February and March of 2003, as part of a hydrogeologic investigation program for the Yucca Flat/Climax Mine Corrective Action Unit in the northeastern portion of the Nevada Test Site. Well ER-2-1 was drilled as part of the Yucca Flat Corrective Action Unit Phase I drilling initiative. The well is located in north central Yucca Flat within Area 2 of the Nevada Test Site, and provided information regarding the radiological and physical environment near underground nuclear tests conducted in a saturated volcanic aquifer setting. Detailed lithologic descriptions with stratigraphic assignments are included in this report. These are based on composite drill cuttings collected every 3 meters and 83 sidewall samples taken at various depths between 113.7 and 754.4 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 27 samples of drill cuttings. The well was collared in tuffaceous alluvium, and penetrated Tertiary-age tuffs of the Timber Mountain and Paintbrush Groups, Calico Hills and Wahmonie Formations, Crater Flat Group, Grouse Canyon Formation, before reaching total depth in the Tunnel Bed Formation.

  7. Completion Report for Well Cluster ER-5-4

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

    2005-02-01

    Well Cluster ER-5-4 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The cluster consists of two wells, positioned about 30 meters apart on the same drill pad, constructed as part of a hydrogeologic investigation program for Frenchman Flat at the Nevada Test Site. Detailed lithologic descriptions with preliminary stratigraphic assignments for the well cluster are included in this report. These are based on composite drill cuttings collected every 3 meters, and 156 sidewall samples taken at various depths below 192 meters in both boreholes, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 122 samples. Well ER-5-4 penetrated approximately 1,120 meters of Quaternary and Tertiary alluvium before reaching total depth in Tertiary volcanic rocks at 1,137.5 meters. The deeper Well ER-5-4 No.2 penetrated 1,120.4 meters of alluvial sediments, and was terminated within Tertiary volcanic rocks at a depth of 2,133.6 meters, indicating that Paleozoic rocks are deeper than expected at this site.

  8. Completion Report for Well ER-7-1

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-11-01

    Well ER-7-1 was drilled for the U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in January and February 2003, as part of a hydrogeologic investigation program in Yucca Flat. A 47.0-centimeter surface hole was drilled and cased off to a depth of 541.0 meters below the surface. The hole diameter was then decreased to 31.8 centimeters for drilling to a total depth of 762.0 meters. Detailed lithologic descriptions with stratigraphic assignments are included in this report. These are based on composite drill cuttings collected every 3 meters, and 62 sidewall samples taken at various depths below 85.3 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies were conducted on 22 samples of cuttings. The well was collared in Quaternary surficial deposits and penetrated a thick section of Tertiary-age volcanic deposits before terminating in carbonate rocks of Paleozoic-age.

  9. DISPOSAL OF TRU WASTE FROM THE PLUTONIUM FINISHING PLANT IN PIPE OVERPACK CONTAINERS TO WIPP INCLUDING NEW SECURITY REQUIREMENTS

    SciTech Connect (OSTI)

    Hopkins, A.M.; Sutter, C.; Hulse, G.; Teal, J.

    2003-02-27

    The Department of Energy is responsible for the safe management and cleanup of the DOE complex. As part of the cleanup and closure of the Plutonium Finishing Plant (PFP) located on the Hanford site, the nuclear material inventory was reviewed to determine the appropriate disposition path. Based on the nuclear material characteristics, the material was designated for stabilization and packaging for long term storage and transfer to the Savannah River Site or, a decision for discard was made. The discarded material was designated as waste material and slated for disposal to the Waste Isolation Pilot Plant (WIPP). Prior to preparing any residue wastes for disposal at the WIPP, several major activities need to be completed. As detailed a processing history as possible of the material including origin of the waste must be researched and documented. A technical basis for termination of safeguards on the material must be prepared and approved. Utilizing process knowledge and processing history, the material must be characterized, sampling requirements determined, acceptable knowledge package and waste designation completed prior to disposal. All of these activities involve several organizations including the contractor, DOE, state representatives and other regulators such as EPA. At PFP, a process has been developed for meeting the many, varied requirements and successfully used to prepare several residue waste streams including Rocky Flats incinerator ash, Hanford incinerator ash and Sand, Slag and Crucible (SS&C) material for disposal. These waste residues are packed into Pipe Overpack Containers for shipment to the WIPP.

  10. Pulmonary Function After Treatment for Embryonal Brain Tumors on SJMB03 That Included Craniospinal Irradiation

    SciTech Connect (OSTI)

    Green, Daniel M.; Merchant, Thomas E.; Billups, Catherine A.; Stokes, Dennis C.; Broniscer, Alberto; Bartels, Ute; Chintagumpala, Murali; Hassall, Timothy E.; Gururangan, Sridharan; McCowage, Geoffrey B.; Heath, John A.; Cohn, Richard J.; Fisher, Michael J.; Srinivasan, Ashok; Robinson, Giles W.; Gajjar, Amar

    2015-09-01

    Purpose: The treatment of children with embryonal brain tumors (EBT) includes craniospinal irradiation (CSI). There are limited data regarding the effect of CSI on pulmonary function. Methods: Protocol SJMB03 enrolled patients 3 to 21 years of age with EBT. Pulmonary function tests (PFTs) (forced expiratory volume in 1 second [FEV{sub 1}] and forced vital capacity [FVC] by spirometry, total lung capacity [TLC] by nitrogen washout or plethysmography, and diffusing capacity of the lung for carbon monoxide corrected for hemoglobin [DLCO{sub corr}]) were obtained. Differences between PFTs obtained immediately after the completion of CSI and 24 or 60 months after the completion of treatment (ACT) were compared using exact Wilcoxon signed-rank tests and repeated-measures models. Results: Between June 24, 2003, and March 1, 2010, 303 eligible patients (spine dose: ≤2345 cGy, 201; >2345 cGy, 102; proton beam, 20) were enrolled, 260 of whom had at least 1 PFT. The median age at diagnosis was 8.9 years (range, 3.1-20.4 years). The median thoracic spinal radiation dose was 23.4 Gy (interquartile range [IQR], 23.4-36.0 Gy). The median cyclophosphamide dose was 16.0 g/m{sup 2} (IQR, 15.7-16.0 g/m{sup 2}). At 24 and 60 months ACT, DLCO{sub corr} was <75% predicted in 23% (27/118) and 25% (21/84) of patients, FEV{sub 1} was <80% predicted in 20% (34/170) and 29% (32/109) of patients, FVC was <80% predicted in 27% (46/172) and 28% (30/108) of patients, and TLC was <75% predicted in 9% (13/138) and 11% (10/92) of patients. DLCO{sub corr} was significantly decreased 24 months ACT (median difference [MD] in % predicted, 3.00%; P=.028) and 60 months ACT (MD in % predicted, 6.00%; P=.033) compared with the end of radiation therapy. These significant decreases in DLCO{sub corr} were also observed in repeated-measures models (P=.011 and P=.032 at 24 and 60 months ACT, respectively). Conclusions: A significant minority of EBT survivors experience PFT deficits after CSI. Continued monitoring of this cohort is planned.

  11. Sloan Digital Sky Survey II (SDSS-II), Data Release 7, including the Legacy Survey

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Sloan Digital Sky Survey (SDSS) is a series of three interlocking imaging and spectroscopic surveys, carried out over an eight-year period with a dedicated 2.5m telescope located at Apache Point Observatory in Southern New Mexico. The seventh data release (DR7) from the SDSS represents a completion of the overall, original project, though SDSS-III began in 2008 and will build upon the knowledge gained already. The SDSS Legacy Survey provided a uniform, well-calibrated map of more than 7,500 square degrees of the North Galactic Cap, and three stripes in the South Galactic Cap totaling 740 square degrees. The central stripe in the South Galactic Gap, Stripe 82, was scanned multiple times to enable a deep co-addition of the data and to enable discovery of variable objects. Legacy data supported studies ranging from asteroids and nearby stars to the large-scale structure of the universe. All of the imaging data have been processed to yield calibrated astrometric and photometric parameters and classifications. These parameters are available in one or more tables in a database accessible via the Catalog Archive Server (CAS) at http://cas.sdss.org/astro. [taken and edited from the Legacy page at http://www.sdss.org/legacy/index.html] All three surveys summarized are: 1) Legacy: an imaging survey in five bands over a contiguous 7646 deg2 high-latitude elliptical region in the Northern Galactic Cap, plus an additional 750 deg2 in the Southern Galactic Cap, together with spectroscopy of complete samples of galaxies and quasars covering about 8200 square degrees. The total imaging area in the Legacy survey is 8423 square degrees; 2) SEGUE: (Sloan Extension for Galactic Understanding and Exploration): additional imaging of 3240 deg2 of sky at lower Galactic latitudes, together with spectroscopy of 240,000 stars towards 200 sight lines covering 1400 square degrees (spread throughout the Legacy and SEGUE imaging footprints), to study the structure of the Milky Way; 3) Supernova: the equivalent of about 80 repeated imaging scans of the Southern Equatorial Stripe (ra > 310 or ra < 59; -1.25 > dec < 1.25) obtained in variable weather conditions (some clouds) to search for supernovae in the redshift range 0.1 < z < 0.4. The catalog derived from the images includes more than 350 million celestial objects, and spectra of 930,000 galaxies, 120,000 quasars, and 460,000 stars. The data are fully calibrated and reduced, carefully checked for quality, and publicly accessible through efficient databases. The data have been publicly released in a series of annual data releases, culminating in the final data release, DR7.

  12. Completion Report for Well ER-12-2

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-11-01

    Well ER-12-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The well was drilled from November 2002 to January 2003 as part of a hydrogeologic investigation program for the Yucca Flat Corrective Action Unit. The overall purpose of the well was to gather subsurface data to better characterize the hydrogeology in the northwestern portion of Yucca Flat. The well was drilled to total measured depth of 2,097.9 meters. The 131.1-centimeter-diameter borehole was left open (i.e., uncased) below the base of the intermediate casing at 901.6 meters. A piezometer string was installed outside the surface casing to a depth of 176.4 meters to monitor a zone of perched water. Data gathered during and shortly after hole construction include composite drill cuttings samples collected every 3 meters, sidewall core samples from 7 depths, various geophysical logs, and water level measurements. These data indicate that the well penetrated, in descending order, 137.5 meters of Quaternary and Tertiary alluvium, 48.8 meters of Tertiary volcanic rocks, 289.6 meters of Mississippian Chainman Shale, and 1,622.5 meters of Mississippian and Upper Devonian Eleana Formation consisting of shale, argillite, sandstone, quartzite, and limestone. Forty-seven days after the well was drilled the water level inside the main hole was tagged at the depth of 65.43 meters, and the water level inside the piezometer string was tagged at 127.14 meters.

  13. New York Completes Smart Grid Project to Build a More Reliable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid New York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid April 15, 2014 ...

  14. File:Land sale mineral release complete.pdf | Open Energy Information

    Open Energy Info (EERE)

    Land sale mineral release complete.pdf Jump to: navigation, search File File history File usage File:Land sale mineral release complete.pdf Size of this preview: 463 599 pixels....

  15. Complete Fiber/Copper Cable Solution for Long-Term Temperature...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete FiberCopper Cable Solution for Long-Term Temperature and Pressure Measurement in Supercritical Reservoirs and EGS Wells Complete FiberCopper Cable Solution for Long-Term ...

  16. Employee Separation: Completing HQ F 3293.1, Sec. 7c | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee Separation: Completing HQ F 3293.1, Sec. 7c Employee Separation: Completing HQ F 3293.1, Sec. 7c Employee Separation: Completing HQ F 3293.1, Sec. 7c PDF icon GUIDANCE - Completing HQ F 3293 1 Sec 7c FINAL 140320.pdf More Documents & Publications Records Management Exit Procedures Social Media Records and You Social Media Records and You

  17. After More Than 20 Years Operating, Hanford’s Soil Vapor Extraction Project Nears Completion

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Hanford workers are fast approaching the successful completion of a long-term cleanup project.

  18. June 30, 2008: US portion of Large Hadron Collider completed | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 30, 2008: US portion of Large Hadron Collider completed June 30, 2008: US portion of Large Hadron Collider completed June 30, 2008: US portion of Large Hadron Collider completed June 30, 2008 The Department and the National Science Foundation announce that the U.S. contribution to the Large Hadron Collider (LHC) has been completed on budget and ahead of schedule. The LHC, located near Geneva, Switzerland, at the CERN laboratory, is the largest international scientific facility ever

  19. Identifying messaging completion in a parallel computer by checking for change in message received and transmitted count at each node

    DOE Patents [OSTI]

    Archer, Charles J.; Hardwick, Camesha R.; McCarthy, Patrick J.; Wallenfelt, Brian P.

    2009-06-23

    Methods, parallel computers, and products are provided for identifying messaging completion on a parallel computer. The parallel computer includes a plurality of compute nodes, the compute nodes coupled for data communications by at least two independent data communications networks including a binary tree data communications network optimal for collective operations that organizes the nodes as a tree and a torus data communications network optimal for point to point operations that organizes the nodes as a torus. Embodiments include reading all counters at each node of the torus data communications network; calculating at each node a current node value in dependence upon the values read from the counters at each node; and determining for all nodes whether the current node value for each node is the same as a previously calculated node value for each node. If the current node is the same as the previously calculated node value for all nodes of the torus data communications network, embodiments include determining that messaging is complete and if the current node is not the same as the previously calculated node value for all nodes of the torus data communications network, embodiments include determining that messaging is currently incomplete.

  20. Office of River Protection (ORP) Mission Completion Strategy

    SciTech Connect (OSTI)

    WIEGMAN, S.A.

    2002-02-24

    DOE's Office of River Protection (ORP) is readying itself to commence construction of a Waste Treatment Plant (WTP) that will start the process of turning Hanford tank waste into glass. The plant is state-of-the art and includes reasonable flexibility to improve operations as technology and operational understandings improve. During its 40 year design life the plant has the capability to treat half of the total volume of tank waste and reduce risk to the public by up to ninety percent. Looking beyond initial processing towards the project end state, however, it is apparent that ORP's baseline approach is part of the issue raised by the DOE Secretary when he said that $300 billion and 75 years is too costly and too long for DOE's environmental cleanups. ORP has reviewed its cost and schedule drivers and has started identifying areas where better technologies and risk-based strategies could substantially decrease its life cycle cost and schedule. Specific technologies under consideration will be discussed along with expected return on investment. ORP is totally committed to taking all steps necessary during cleanup to protect human health and the environment and to comply with appropriate regulations and commitments. But, ORP is also very conscious of the fact that the history of Hanford production and tank farm operations has resulted in very large tank-to-tank variabilities in the waste constituents. Not all tank wastes demand the same high level of rigor in treatment as provided by the WTP in order to protect people and the environment. Parallel treatment paths, keyed to the hazards and chemical challenges each tank presents, need to be developed. The WTP vitrification capabilities should be deployed for the higher risk wastes that require vitrification. By getting wastes in the proper paths for treatment based upon their chemical characteristics and inherent risks, ORP will be able to both accelerate the cleanup schedule and bring its life cycle and annual funding requirements into line. The WTP needs to be managed and its throughput enhanced to vitrify all of the HLW and approximately 50% of the low-level tank waste by about 2030. That represents the lion's share of the current and long-term risk presented by the tanks. For much of the low activity waste currently in the tanks, parallel treatment technologies are required that protect people and the environment but require less time and less cost than the total vitrification option presents. Any such technologies that ORP deploys must have sound, defensible bases with the prerequisite QA pedigrees. Providing parallel paths for lower risk wastes will allow ORP to avoid the 20-30 year treatment schedule that lower risk tanks would otherwise face. Potential parallel paths will be described. ORP also needs to deploy and test technologies to demonstrate that its tank farms can be successfully closed. Starting such a demonstration during the period while the plant is under construction will allow ORP to start developing critical data that it will need for permanent closures at a later date. It will take many years of testing such demonstration activities and monitoring to develop confidence in tank closure approaches. If ORP starts such an effort, practicing on smaller, more benign tanks, it will reap significant institutional benefits in the near-term and have far better information when it is ready to start to close entire tank farms in the future.

  1. Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada

    SciTech Connect (OSTI)

    2009-12-01

    The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

  2. Completion Report for Well ER-12-3 Corrective Action Unit 99: Rainier Mesa - Shoshone Mountain

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada Corporation

    2006-05-01

    Well ER-12-3 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The well was drilled in March and April 2005 as part of a hydrogeologic investigation program for the Rainier Mesa-Shoshone Mountain Corrective Action Unit. The overall purpose of the well was to gather subsurface data to better characterize the hydrogeology of central Rainier Mesa, especially in the older Tertiary volcanic rocks and Paleozoic sedimentary rocks. The main 47.0-centimeter hole was drilled to a depth of 799.2 meters and cased with 33.97-centimeter casing to 743.1 meters. The hole diameter was then decreased to 31.1 centimeters, and the well was drilled to a total depth of 1,496.0 meters. The completion string consisted of 13.97-centimeter stainless steel casing, with two slotted intervals open to the lower carbonate aquifer, suspended from 19.37-centimeter carbon steel casing. A piezometer string was installed outside the 33.97-centimeter casing to a depth of 467.1 meters to monitor a zone of perched water within the Tertiary volcanic section. Data gathered during and shortly after hole construction include composite drill cuttings samples collected every 3 meters (extra cuttings samples were collected from the Paleozoic rocks for paleontological analyses), sidewall core samples from 35 depths, various geophysical logs, and water level measurements. These data indicate that the well penetrated 674.2 meters of Tertiary volcanic rocks and 821.7 meters of Paleozoic dolomite and limestone. Forty-nine days after the well was completed, but prior to well development and testing, the water level inside the main hole was tagged at the depth of 949.1 meters, and the water level inside the piezometer string was tagged at 379.9 meters.

  3. Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This waste analysis plan satisfies the requirements of Item 3 of Ecology Order 93NM-201 as amended per the Settlement Agreement. Item 3 states: ``Within forty (40) calendar days of receipt of this Order, the US Department of Energy Richland Operations (DOE-RL) and Westinghouse Hanford Company (WHC) shall provide Ecology with a plan for review and approval detailing the established criteria and procedures for waste inspection, segregation, sampling, designation, and repackaging of all containers reported in item {number_sign}1. The report shall include sampling plan criteria for different contaminated media, i.e., soils, compactable waste, high-efficiency particular air (HEPA) filters, etc., and a schedule for completing the work within the time allowed under this Order.`` Item 3 was amended per the Settlement Agreement as follows: ``In addition to the waste inspection plans for the ``unknowns`` previously provided and currently being supplemented, DOE-RL and WHC shall provide a draft waste analysis plan for the containers reported in Item 1 of the Order to Ecology by July 12, 1993. A final, DOE-RL approved waste analysis plan shall be submitted to Ecology by September 1, 1993, for Ecology`s written approval by September 15, 1993.`` Containers covered by the Order, Settlement Agreement, and this waste analysis plan consist of all those reported under Item 1 of the Order, less any containers that have been identified in unusual occurrences reported by Tank Farms. This waste analysis plan describes the procedures that will be undertaken to confirm or to complete designation of the solid waste identified in the Order.

  4. Electron beam simulation from gun to collector: Towards a complete solution

    SciTech Connect (OSTI)

    Mertzig, R. Shornikov, A. Wenander, F.; Beebe, E.; Pikin, A.

    2015-01-09

    An electron-beam simulation technique for high-resolution complete EBIS/T modelling is presented. The technique was benchmarked on the high compression HEC{sup 2} test-stand with an electron beam current, current density and energy of 10 A, 10 kA/cm{sup 2} and 49.2 keV, and on the immersed electron beam at REXEBIS for electron beam characteristics of 0.4 A, 200 A/cm{sup 2} and 4.5 keV. In both Brillouin-like and immersed beams the electron-beam radius varies from several millimeters at the gun, through some hundreds of micrometers in the ionization region to a few centimeters at the collector over a total length of several meters. We report on our approach for finding optimal meshing parameters, based on the local beam properties such as magnetic field-strength, electron energy and beam radius. This approach combined with dividing the problem domain into sub-domains, and subsequent splicing of the local solutions allowed us to simulate the beam propagation in EBISes from the gun to the collector using a conventional PC in about 24–36 h. Brillouin-like electron beams propagated through the complete EBIS were used to analyze the beam behavior within the collector region. We checked whether elastically reflected paraxial electrons from a Brillouin-like beam will escape from the collector region and add to the loss current. We have also studied the power deposition profiles as function of applied potentials using two electrode geometries for a Brillouin-like beam including the effects of backscattered electrons.

  5. ARM: Surface Radiation Measurement Quality Control testing, including climatologically configurable limits

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Yan Shi; Laura Riihimaki

    1994-01-07

    Surface Radiation Measurement Quality Control testing, including climatologically configurable limits

  6. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  7. Completion Report for Model Evaluation Well ER-5-5: Corrective Action Unit 98: Frenchman Flat

    SciTech Connect (OSTI)

    NSTec Underground Test Area and Boreholes Programs and Operations

    2013-01-18

    Model Evaluation Well ER-5-5 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in July and August 2012 as part of a model evaluation well program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radiological data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to obtain data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test MILK SHAKE, conducted in Emplacement Hole U-5k in 1968, which were considered to be uncertain due to the unknown extent of a basalt lava-flow aquifer present in this area. Well ER-5-5 is expected to provide information to refine the Phase II Frenchman Flat hydrostratigraphic framework model, if necessary, as well as to support future groundwater flow and transport modeling. The 31.1-centimeter (cm) diameter hole was drilled to a total depth of 331.3 meters (m). The completion string, set at the depth of 317.2 m, consists of 16.8-cm stainless-steel casing hanging from 19.4-cm carbon-steel casing. The 16.8-cm stainless-steel casing has one slotted interval open to the basalt lava-flow aquifer and limited intervals of the overlying and underlying alluvial aquifer. A piezometer string was also installed in the annulus between the completion string and the borehole wall. The piezometer is composed of 7.3-cm stainless-steel tubing suspended from 6.0-cm carbon-steel tubing. The piezometer string was landed at 319.2 m, to monitor the basalt lava-flow aquifer. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, preliminary water quality measurements, and water-level measurements. The well penetrated 331.3 m of Quaternary–Tertiary alluvium, including an intercalated layer of saturated basalt lava rubble. No well development or hydrologic testing was conducted in this well immediately after completion; however, a preliminary water level was measured in the piezometer string at the depth of 283.4 m on September 25, 2012. No tritium above the minimum detection limit of the field instruments was detected in this hole. Future well development, sampling, and hydrologic testing planned for this well will provide more accurate hydrologic information for this site. The stratigraphy, general lithology, and water level were as expected, though the expected basalt lava-flow aquifer is basalt rubble and not the dense, fractured lava as modeled. The lack of tritium transport is likely due to the difference in hydraulic properties of the basalt lava-flow rubble encountered in the well, compared to those of the fractured aquifer used in the flow and transport models.

  8. U.S. Completes Contribution to World's Most Powerful Particle Accelerator |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Completes Contribution to World's Most Powerful Particle Accelerator U.S. Completes Contribution to World's Most Powerful Particle Accelerator June 30, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. contribution to the Large Hadron Collider (LHC) has been completed on budget and ahead of schedule, the U.S. Department of Energy (DOE) and the National Science Foundation (NSF) said today. The LHC, located near Geneva, Switzerland at the CERN laboratory, is the largest

  9. U.S. Department of Energy Announces Completion of 500 Industrial Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Saving Assessment | Department of Energy Completion of 500 Industrial Energy Saving Assessment U.S. Department of Energy Announces Completion of 500 Industrial Energy Saving Assessment May 9, 2008 - 11:30am Addthis Over 80 Trillion Btus of Natural Gas Savings Found WASHINGTON - The U.S. Department of Energy (DOE) today announced that it has completed the 500th Energy Saving Assessment (ESA) at the nation's largest industrial facilities. These assessments have helped companies identify

  10. U.S. and Japan Complete Successful Field Trial of Methane Hydrate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Technologies | Department of Energy Japan Complete Successful Field Trial of Methane Hydrate Production Technologies U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies May 2, 2012 - 10:40am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu announced today the completion of a successful, unprecedented test of technology in the North Slope of Alaska that was able to safely extract a steady flow of natural gas from methane hydrates - a

  11. New York Completes Smart Grid Project to Build a More Reliable, Resilient

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Grid | Department of Energy York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid New York Completes Smart Grid Project to Build a More Reliable, Resilient Power Grid April 15, 2014 - 11:49am Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Obama Administration's broader efforts to strengthen critical energy infrastructure and build a stronger, more reliable power grid, the Energy Department today recognized the completion of New York

  12. U.S. and Japan Complete Successful Field Trial of Methane Hydrate

    Energy Savers [EERE]

    Production Technologies | Department of Energy and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies May 2, 2012 - 1:00pm Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today the completion of a successful, unprecedented test of technology in the North Slope of Alaska that was able to safely extract a steady flow of natural gas from methane hydrates -

  13. Major Milestone: PPPL completes first quadrant of the heart of the National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spherical Torus Experiment Upgrade | Princeton Plasma Physics Lab Major Milestone: PPPL completes first quadrant of the heart of the National Spherical Torus Experiment Upgrade By John Greenwald March 18, 2013 Tweet Widget Google Plus One Share on Facebook Mission accomplished: The completed first section of the NSTX-U center stack capped months of demanding preparations and close teamwork. (Photo by Elle Starkman, PPPL Office of Communications) Mission accomplished: The completed first

  14. Y-12 completes $10M upgrades to Analytical Chemistry facility | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex $10M ... Y-12 completes $10M upgrades to Analytical Chemistry facility Posted: April 14, 2016 - 12:02pm OAK RIDGE, Tenn. - The Y-12 National Security Complex has completed significant infrastructure upgrades to the plant's Analytical Chemistry facility to improve mission capability and reliability. The year-long effort was completed on schedule and budget. Built in 1957, Building 9995 provides comprehensive analytical services in support of core missions,

  15. Microsoft Word - DOE News Release-DOE Completes Cleanup at New York California Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Completes Cleanup at New York, California Sites Recovery Act funds accelerate cleanup; support job creation and footprint reduction WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18 th and 19 th sites to be completely cleaned of legacy waste. This

  16. NNSA completes Y-12 project ahead of schedule, under budget | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration completes Y-12 project ahead of schedule, under budget Friday, February 27, 2015 - 2:48pm NNSA Blog NNSA has completed a major capital improvement project that has resulted in critical infrastructure upgrades to two key production buildings at the Y-12 National Security Complex. NNSA finished the $75.7 million project nearly 11 months ahead of the construction completion schedule and approximately $5.6 million under budget. The Nuclear Facilities Risk

  17. Construction completed, PPPL is set to resume world-class fusion...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction completed, PPPL is set to resume world-class fusion research By John ... Plasma Physics Laboratory (PPPL), world-leading fusion research resumes later this fall. ...

  18. Retrieval of Tenth Single-shell Tank Complete at Hanford's Office...

    Office of Environmental Management (EM)

    completed retrieval of radioactive and chemical waste from the tenth underground waste ... this year, as crews began a two-step chemical soak process to dissolve the hardened ...

  19. DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee

    Broader source: Energy.gov [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee.

  20. Making it Easier to Complete Clean Energy Projects with Qualified Energy Conservation Bonds (QECBs)

    Broader source: Energy.gov [DOE]

    This webinar, held on July 19, 2012, provides information on how to complete clean energy projects with qualified energy conservation bonds.

  1. Construction completed, PPPL is set to resume world-class fusion...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    leadership in the quest for fusion systems that can form the basis of commercial fusion power. "This achievement signifies the completion of an extremely successful challenge, ...

  2. Making it Easier to Complete Clean Energy Projects with Qualified Energy Conservation Bonds (QECBs)

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on How to to Complete Clean Energy Projects with Qualified Energy Conservation Bonds (QECBs)

  3. Idaho Completion Projects Accelerated Retrieval Project Overview of the Pit 4 Non-Time Critical Removal Action

    SciTech Connect (OSTI)

    T. L. Clements; R. E. Arbon; B. D. Preussner

    2005-02-01

    This paper presents an overview of the Accelerated Retrieval Project performed by the Idaho Completion Project at the Idaho National Laboratory (INL). Topics include an overall description of the process and methods that will retrieve, characterize, and certify newly generated transuranic (TRU) waste for disposal at the Waste Isolation Pilot Plant (WIPP). The retrieval and characterization of buried TRU waste presents unique challenges. Innovative approaches developed and discussed are: excavation, RCRA waste sampling, visual examination, and deployment of the WIPP Central Characterization Project mobile systems to the INL.

  4. Completion Report for Well ER-16-1 Corrective Action Unit 99: Rainier Mesa - Shoshone Mountain

    SciTech Connect (OSTI)

    NSTec Geology Services

    2006-12-01

    Well ER-16-1 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The well was drilled in June and July 2005 as part of a hydrogeologic investigation program for the Rainier Mesa-Shoshone Mountain Corrective Action Unit, Number 99. The overall purpose of the well was to gather subsurface data to better characterize the hydrogeology of the Shoshone Mountain area, especially in the older Tertiary and pre-Tertiary strata. The main 46.99-centimeter hole was drilled to a depth of 702.9 meters and cased with 33.97-centimeter casing to 663.7 meters. The hole diameter was then decreased to 31.1 centimeters, and the well was drilled to total depth of 1,220.7 meters. A completion string set at the depth of 1,162.4 meters consisted of 13.97-centimeter stainless-steel casing, with one continuous slotted interval open to the lower carbonate aquifer. The fluid level in the borehole soon dropped, so the borehole was deepened in July 2006. To deepen the borehole, the slotted section was cemented and a 12.1-centimeter hole was drilled through the bottom of the completion string to the new total depth of 1,391.7 meters, which is 171.0 meters deeper than the original borehole. A string of 6.03-centimeter carbon-steel tubing with one continuous slotted interval at 1,361.8 to 1,381.4 meters, and open to the lower carbonate aquifer, was installed in the well with no gravel packing or cement, to serve as a monitoring string. Data gathered during and shortly after hole construction include composite drill cuttings samples collected every 3 meters (extra cuttings samples were collected from the Paleozoic rocks for paleontological analyses), sidewall core samples from 37 depths, various geophysical logs, and water level measurements. These data indicate that the well penetrated 646.8 meters of Tertiary volcanic rocks and 744.9 meters of Paleozoic dolomite, quartzite, shale, and limestone. Three weeks after the monitoring string was installed, the water level was tagged at the drill hole depth of 1,271.9 meters, which equates to an estimated elevation of 761.7 meters, accounting for the borehole angle.

  5. COMPLETION OF THE TRANSURANIC GREATER CONFINEMENT DISPOSAL BOREHOLE PERFORMANCE ASSESSMENT FOR THE NEVADA TEST SITE

    SciTech Connect (OSTI)

    Colarusso, Angela; Crowe, Bruce; Cochran, John R.

    2003-02-27

    Classified transuranic material that cannot be shipped to the Waste Isolation Pilot Plant in New Mexico is stored in Greater Confinement Disposal boreholes in the Area 5 Radioactive Waste Management Site on the Nevada Test Site. A performance assessment was completed for the transuranic inventory in the boreholes and submitted to the Transuranic Waste Disposal Federal Review Group. The performance assessment was prepared by Sandia National Laboratories on behalf of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office using an iterative methodology that assessed radiological releases from the intermediate depth disposal configuration against the regulatory requirements of the 1985 version of 40 CFR 191 of the U.S. Environmental Protection Agency. The transuranic materials are stored at 21 to 37 m depth (70 to 120 ft) in large diameter boreholes constructed in the unsaturated alluvial deposits of Frenchman Flat. Hydrologic processes that affect long- term isolation of the radionuclides are dominated by extremely slow upward rates of liquid/vapor advection and diffusion; there is no downward pathway under current climatic conditions and there is no recharge to groundwater under future ''glacial'' climatic conditions. A Federal Review Team appointed by the Transuranic Waste Disposal Federal Review Group reviewed the Greater Confinement Disposal performance assessment and found that the site met the majority of the regulatory criteria of the 1985 and portions of the 1993 versions of 40 CFR 191. A number of technical and procedural issues required development of supplemental information that was incorporated into a final revision of the performance assessment. These issues include inclusion of radiological releases into the complementary cumulative distribution function for the containment requirements associated with drill cuttings from inadvertent human intrusion, verification of mathematical models used in the performance assessment, inclusion of dose calculations from collocated low-level waste in the boreholes for the individual protection requirements, further assessments of engineered barriers and conditions associated with the assurance requirements, and expansion of documentation provided for assessing the groundwater protection requirements. The Transuranic Waste Disposal Federal Review Group approved the performance assessment for Greater Confinement Disposal boreholes in 2001 and did not approve the Application of the Assurance Requirements. Remaining issues concerned with engineered barriers and the multiple aspects of the Assurance Requirements will be resolved at the time of closure of the Area 5 Radioactive Waste Management Site. This is the first completion and acceptance of a performance assessment for transuranic materials under the U.S. Department of Energy self-regulation. The Greater Confinement Disposal boreholes are only the second waste disposal configuration to meet the safety regulatory requirements of 40 CFR 191.

  6. Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980

    SciTech Connect (OSTI)

    Kelsey, J.R.

    1981-03-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

  7. Solar heating and hot water system installed at the Senior Citizen Center, Huntsville, Alabama. [Includes engineering drawings

    SciTech Connect (OSTI)

    Not Available

    1980-02-01

    Information is provided on the solar energy system installed at the Huntsville Senior Citizen Center. The solar space heating and hot water facility and the project involved in its construction are described in considerable detail and detailed drawings of the complete system and discussions of the planning, the hardware, recommendations, and other pertinent information are included. The facility was designed to provide 85 percent of the hot water and 85 percent of the space heating requirements. Two important factors concerning this project for commercial demonstration are the successful use of silicon oil as a heat transfer fluid and the architecturally aesthetic impact of a large solar energy system as a visual centerpoint. There is no overheat or freeze protection due to the characteristics of the silicon oil and the design of the system. Construction proceeded on schedule with no cost overruns. It is designed to be relatively free of scheduled maintenance, and has experienced practically no problems.

  8. Composite materials and bodies including silicon carbide and titanium diboride and methods of forming same

    DOE Patents [OSTI]

    Lillo, Thomas M.; Chu, Henry S.; Harrison, William M.; Bailey, Derek

    2013-01-22

    Methods of forming composite materials include coating particles of titanium dioxide with a substance including boron (e.g., boron carbide) and a substance including carbon, and reacting the titanium dioxide with the substance including boron and the substance including carbon to form titanium diboride. The methods may be used to form ceramic composite bodies and materials, such as, for example, a ceramic composite body or material including silicon carbide and titanium diboride. Such bodies and materials may be used as armor bodies and armor materials. Such methods may include forming a green body and sintering the green body to a desirable final density. Green bodies formed in accordance with such methods may include particles comprising titanium dioxide and a coating at least partially covering exterior surfaces thereof, the coating comprising a substance including boron (e.g., boron carbide) and a substance including carbon.

  9. Charge-conjugation symmetric complete impulse approximation for the pion electromagnetic form factor in the covariant spectator theory

    SciTech Connect (OSTI)

    Biernat, Elmar P.; Gross, Franz; Peña, M. T.; Stadler, Alfred

    2015-10-26

    The pion form factor is calculated in the framework of the charge-conjugation invariant covariant spectator theory. This formalism is established in Minkowski space, and the calculation is set up in momentum space. In a previous calculation we included only the leading pole coming from the spectator quark (referred to as the relativistic impulse approximation). In this study we also include the contributions from the poles of the quark which interacts with the photon and average over all poles in both the upper and lower half-planes in order to preserve charge conjugation invariance (referred to as the C-symmetric complete impulse approximation). We find that for small pion mass these contributions are significant at all values of the four-momentum transfer Q2 but, surprisingly, do not alter the shape obtained from the spectator poles alone.

  10. Charge-conjugation symmetric complete impulse approximation for the pion electromagnetic form factor in the covariant spectator theory

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Biernat, Elmar P.; Gross, Franz; Peña, M. T.; Stadler, Alfred

    2015-10-26

    The pion form factor is calculated in the framework of the charge-conjugation invariant covariant spectator theory. This formalism is established in Minkowski space, and the calculation is set up in momentum space. In a previous calculation we included only the leading pole coming from the spectator quark (referred to as the relativistic impulse approximation). In this study we also include the contributions from the poles of the quark which interacts with the photon and average over all poles in both the upper and lower half-planes in order to preserve charge conjugation invariance (referred to as the C-symmetric complete impulse approximation).more » We find that for small pion mass these contributions are significant at all values of the four-momentum transfer Q2 but, surprisingly, do not alter the shape obtained from the spectator poles alone.« less

  11. Completion Report for Model Evaluation Well ER-11-2: Corrective Action Unit 98: Frenchman Flat

    SciTech Connect (OSTI)

    NSTec Underground Test Area and Boreholes Programs and Operations

    2013-01-22

    Model Evaluation Well ER-11-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in August 2012 as part of a model evaluation program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radionuclide data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to provide data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test PIN STRIPE, conducted in borehole U-11b in 1966. Well ER-11-2 will provide information that can be used to refine the Phase II Frenchman Flat hydrostratigraphic framework model if necessary, as well as to support future groundwater flow and transport modeling. The main 31.1-centimeter (cm) hole was drilled to a total depth of 399.6 meters (m). A completion casing string was not set in Well ER-11-2. However, a piezometer string was installed in the 31.1-cm open hole. The piezometer is composed of 7.3-cm stainless-steel tubing hung on 6.0-cm carbon-steel tubing via a crossover sub. The piezometer string was landed at 394.5 m, for monitoring the lower tuff confining unit. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, water quality (including tritium and other test-related radionuclides) measurements, and water level measurements. The well penetrated 42.7 m of Quaternary and Tertiary alluvium and 356.9 m of Tertiary volcanic rock. The water-level measured in the piezometer string on September 25, 2012, was 353.8 m below ground surface. No tritium above levels detectable by field methods were encountered in this hole. No well development or hydrologic testing was conducted in this well immediately after completion, and future well development, sampling, and hydrologic testing planned for this well will be limited due to the diameter of the piezometer string. The stratigraphy, general lithology, and the water level are as expected, but the section of geology encountered is higher than expected due to faulting. No tritium above the minimum detection limit of the field equipment was detected because the target aquifer (the Topopah Spring aquifer) at Well ER-11-2 is structurally higher than expected and thus unsaturated.

  12. Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    On January 23, 1992, waste management problems in the Tank Farms were acknowledged through an Unusual Occurrence (UO) Report No. RL-WHC-TANKFARM-19920007 (DOE-RL 1992). On March 10, 1993, the Washington State Department of Ecology (Ecology) issued Order 93NM-201 (Order) to the US Department of Energy, Richland Operations Office (DOE-RL) and the Westinghouse Hanford Company (Westinghouse Hanford) asserting that ``DOE-RL and Westinghouse Hanford have failed to designate approximately 2,000 containers of solid waste in violation of WAC 173-303170(l)(a) and the procedures of WAC 173-303-070`` (Ecology 1993). On June 30, 1993, a Settlement Agreement and Order Thereon (Settlement Agreement) among Ecology, DOE-RL, and Westinghouse Hanford was approved by the Pollution Control Hearings Board (PCHB). Item 3 of the Settlement Agreement requires that DOE-RL and Westinghouse Hanford submit a waste analysis plan (WAP) for the waste subject to the Order by September 1, 1993 (PCHB 1993). This WAP satisfies the requirements of Item 3 of the Order as amended per the Settlement Agreement. Item 3 states: ``Within forty (40) calendar days of receipt of this Order, DOE-RL and WHC provide Ecology with a waste analysis plan for review and approval detailing the established criteria and procedures for waste inspection, segregation, sampling, designation, and repackaging of all containers reported in item No. 1. The report shall include sampling plan criteria for different contaminated media, i.e., soils, compactable waste, high-efficiency particular air (HEPA) filters, etc., and a schedule for completing the work within the time allowed under this Order.``

  13. DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife

  14. DOE Completes Cleanup at New York, California Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18th and 19th sites to be completely cleaned of legacy waste. This milestone was

  15. EERE Success Story-Pilot Plant Completes Two 1,000-Hour Ethanol

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Runs | Department of Energy Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs EERE Success Story-Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs January 22, 2016 - 11:01am Addthis ICM Inc. announced successful completion of two 1,000-hour performance runs of its patent-pending Generation 2.0 Co-Located Cellulosic Ethanol process at its cellulosic ethanol pilot plant in St. Joseph, Missouri. This is an important step toward the commercialization of

  16. Y-12 completes waste removal project two years ahead of schedule | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex completes waste ... Y-12 completes waste removal project two years ahead of schedule Posted: May 9, 2016 - 8:43am The Y-12 National Security Complex has completed disposition of 2,247 containers of mixed waste more than two years ahead of a September 2018 deadline. The waste removal was mandated by the Oak Ridge Reservation Site Treatment Plan through a State of Tennessee Department of Environmental and Conservation Commissioner's order to the U.S. Department of

  17. Structure of the Complete 70S Ribosome at 3.7 Å Resolution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Structure of the Complete 70S Ribosome at 3.7 Å Resolution Structure of the Complete 70S Ribosome at 3.7 Å Resolution Print Wednesday, 27 June 2007 00:00 Ribosomes are RNA-based protein factories found in all living cells, responsible for translating the genetic information encoded in messenger RNA (mRNA) into proteins. The first x-ray structures of the complete 70S ribosome were determined in 1999 at 7.8 Å and in 2001 at 5.5 Å, using diffraction data collected at ALS Beamline 5.0.2. These

  18. EA-1440-S-I: Mitigation Action Plan Completion Report | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EA-1440-S-I: Mitigation Action Plan Completion Report EA-1440-S-I: Mitigation Action Plan Completion Report This report presents the U.S. Department of Energy's completion of the May 2008 Mitigation Action Plan (MAP) for the Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (DOE/EA-1440-S-I) . Since May 2008, DOE and the National Renewable Energy Laboratory (NREL) have implemented various traffic

  19. Energy Secretary Bodman Announces SPR Fill to be Complete in August

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC -- Secretary of Energy Samuel Bodman announced today that the planned fill of the Strategic Petroleum Reserve (SPR) will be complete in August, when the SPR reaches 700 million...

  20. U.S. Department of Energy Announces Completion of 500 Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Completing the 500th assessment is a major milestone in our continued work to reduce U.S. industrial energy intensity by 25 percent, while furthering the President's commitment to ...

  1. Alaska - 3 AAC 48.648 - Complete Applications | Open Energy Informatio...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Alaska - 3 AAC 48.648 - Complete ApplicationsLegal Published NA Year Signed or Took Effect 2014...

  2. Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs

    Broader source: Energy.gov [DOE]

    ICM Inc. announced successful completion of two 1,000-hour performance runs of its patent-pending Generation 2.0 Co-Located Cellulosic Ethanol process at its cellulosic ethanol pilot plant in St....

  3. NNSA, Air Force Complete Successful B61-12 Life Extension Program...

    National Nuclear Security Administration (NNSA)

    NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range July 08, 2015 WASHINGTON, D.C. - The United States Air Force (USAF) ...

  4. Y-12 completes waste removal project two years ahead of schedule...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    two years ahead of schedule Posted: May 9, 2016 - 8:43am The Y-12 National Security Complex has completed disposition of 2,247 containers of mixed waste more than two years ahead ...

  5. Y-12 completes waste removal project two years ahead of schedule...

    National Nuclear Security Administration (NNSA)

    two years ahead of schedule May 09, 2016 OAK RIDGE, Tenn. -- The Y-12 National Security Complex has completed disposition of 2,247 containers of mixed waste more than two years ...

  6. NREL Takes First In-Depth Look at Solar Project Completion Timelines...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Takes First In-Depth Look at Solar Project Completion Timelines Report examines new data to show how long the PV interconnection process takes in the U.S. February 11, 2015 The ...

  7. EM’s Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – EM’s Los Alamos Field Office recently completed a steep canyon-side cleanup of mercury-contaminated soil on DOE property just south of a shopping center here.

  8. Idaho site completes demolition of Cold War-era nuclear fuel...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Joint News Release For Immediate Release Date: December 22, 2011 Media Contact: Erik Simpson, (208) 360-0426 Idaho site completes demolition of Cold War-era nuclear fuel...

  9. Workers Complete Asbestos Removal at West Valley to Prepare Facility for Demolition

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act workers safely cleared asbestos from more than 5,500 feet of piping in the Main Plant Process Building. Project completion is an important step in preparing...

  10. U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am Addthis WASHINGTON, DC -The U.S. Department of Energy today delivered the ...

  11. OMEGA Laser System completes 20,000th target shot | National...

    National Nuclear Security Administration (NNSA)

    Laser System completes 20,000th target shot | National Nuclear Security Administration ... Apply for Our Jobs Our Jobs Working at NNSA Blog Home NNSA Blog OMEGA Laser System ...

  12. 100 Area D4 Project Building Completion Report: December 2008 to December 2009

    SciTech Connect (OSTI)

    K.G. Finucane, J.P. Harrie

    2010-10-26

    This report documents the final status of buildings after the completion of D4 activities at the 100 Area of the U.S. Department of Energy Hanford Site from December 1, 2008, to December 31, 2009.

  13. DOE Completes Disposal Operations In Panel 5 of the WIPP Underground...

    Energy Savers [EERE]

    Disposal Operations In Panel 5 of the WIPP Underground DOE Completes Disposal Operations In Panel 5 of the WIPP Underground August 15, 2011 - 12:00pm Addthis Media Contact Deb Gill ...

  14. Microsoft Word - DOE News Release-DOE Completes Cleanup at New...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the...

  15. Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois

    Broader source: Energy.gov [DOE]

    A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide from an industrial plant at a large-scale test site in Illinois.

  16. Recovery Act Investment Moves EM Past Milestone of 100 Project Completions

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently paused to observe a notable achievement: completion of more than 100 projects in its $6 billion...

  17. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Broader source: Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  18. Funding for state, city, and county governments in the state includes: |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Funding for state, city, and county governments in the state includes: Funding for state, city, and county governments in the state includes: PDF icon Funding for state, city, and county governments in the state includes: More Documents & Publications Funding for state, city, and county governments in the state includes: Project Reports for Washoe Tribe of Nevada and California - 2010 Project Nevada Recovery Act State Memo

  19. Numerical power balance and free energy loss analysis for solar cells including optical, thermodynamic, and electrical aspects

    SciTech Connect (OSTI)

    Greulich, Johannes Höffler, Hannes; Würfel, Uli; Rein, Stefan

    2013-11-28

    A method for analyzing the power losses of solar cells is presented, supplying a complete balance of the incident power, the optical, thermodynamic, and electrical power losses and the electrical output power. The involved quantities have the dimension of a power density (units: W/m{sup 2}), which permits their direct comparison. In order to avoid the over-representation of losses arising from the ultraviolet part of the solar spectrum, a method for the analysis of the electrical free energy losses is extended to include optical losses. This extended analysis does not focus on the incident solar power of, e.g., 1000 W/m{sup 2} and does not explicitly include the thermalization losses and losses due to the generation of entropy. Instead, the usable power, i.e., the free energy or electro-chemical potential of the electron-hole pairs is set as reference value, thereby, overcoming the ambiguities of the power balance. Both methods, the power balance and the free energy loss analysis, are carried out exemplarily for a monocrystalline p-type silicon metal wrap through solar cell with passivated emitter and rear (MWT-PERC) based on optical and electrical measurements and numerical modeling. The methods give interesting insights in photovoltaic (PV) energy conversion, provide quantitative analyses of all loss mechanisms, and supply the basis for the systematic technological improvement of the device.

  20. McGraw Hill encyclopedia of science and technology. An international reference work in fifteen volumes including an index

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    This extensively revised and updated 5th Edition features contributions by 3000 distinguished experts - including 16 Nobel Prize winners - working with an international advisory board and 60 consulting editors. Thorough coverage is devoted to 75 separate disciplines in science and technology, from acoustics and biochemistry through fluid mechanics and geophysics to thermodynamics and vertebrate zoology. Detailed entries examine not only the physical and natural sciences, but also all engineering disciplines, discussing both the basic and the most recent theories, concepts, terminology, discoveries, materials, methods, and techniques. All of the new developments and technical advances that have occurred during the last five years - in each of the 75 disciplines - have been added to the encyclopedia and are explored in depth. Completely new material deals with such timely and newsworthy subjects as genetic engineering, artificial intelligence, nuclear medicine, desertification, psycholinguistics, industrial robots, and immunoassay. Also covered in extensive entries are such current topics as video disk recording, metallic glasses, acoustic levitation, magnetic bubble memory, gluons, and computerized tomography. The encyclopedia includes more than 15,000 photographs, drawings, maps, charts, and diagrams, shown in full-color, two-color, or black-and-white reproductions.

  1. Los Alamos Lab Completes Excavation of Waste Disposal Site Used in the

    Energy Savers [EERE]

    Department of Energy Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis The sewage treatment facility before demolition. The sewage treatment facility before demolition. Debris from the sewage treatment facility. Debris from the sewage treatment facility. Site of the demolished sewage treatment facility. Site of the demolished sewage treatment facility. The sewage treatment

  2. Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

    Energy Savers [EERE]

    (September 2013) | Department of Energy Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, post-cleanup, and post-closure has been established in transition guidance for sites that will transfer to a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. PDF icon Site

  3. NNSA, Air Force Complete Successful B61-12 Life Extension Program

    National Nuclear Security Administration (NNSA)

    Instrumented Flight Tests | National Nuclear Security Administration NNSA, Air Force Complete Successful B61-12 Life Extension Program Instrumented Flight Tests February 09, 2015 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) and United States Air Force completed eight successful B61-12 Life Extension Program (LEP) Vibration Fly Around/ Instrumented Measurement Vehicle (VFA/IMV) tests at Eglin Air Force Base and Edwards Air Force Base during July to December 2014.The

  4. Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-07-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  5. Geothermal drilling ad completion technology development program. Semi-annual progress report, April-September 1979

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-05-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

  6. Initial Modeling of a Pressurized Water Reactor Completed Using RELAP-7 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Initial Modeling of a Pressurized Water Reactor Completed Using RELAP-7 Initial Modeling of a Pressurized Water Reactor Completed Using RELAP-7 January 29, 2013 - 12:06pm Addthis Schematic of the OECD PWR benchmark used in the initial RELAP-7 demonstration Schematic of the OECD PWR benchmark used in the initial RELAP-7 demonstration RELAP-7 is a nuclear reactor system safety analysis code. Development started in October 2011, and during the past quarter the initial

  7. Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Now Assessment | Department of Energy Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment This case study describes how the Goodyear Tire Plant saved approximately 93,000 MMBtu and $875,000 annually after increasing steam system energy efficiency in their Union City, Tennessee, plant. PDF icon Goodyear Tire Plant Gains Traction on Energy Savings

  8. How to Apply - Step 1: Complete the Registration Process | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1: Complete the Registration Process How to Apply - Step 1: Complete the Registration Process The table below outlines the various registrations you need, and when you need them, to successfully prepare for the Office of Energy Efficiency and Renewable Energy Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) grant process. The list in the table below is meant to be a guide; interested small businesses should always refer to the applicable Funding

  9. Geothermal drilling and completion technology development program. Annual progress report, October 1979-September 1980

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-11-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  10. NNSA, Air Force Complete Successful B61-12 Life Extension Program

    National Nuclear Security Administration (NNSA)

    Development Flight Test at Tonopah Test Range | National Nuclear Security Administration NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range November 16, 2015 WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of effective

  11. Y-12 completes waste removal project two years ahead of schedule | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration completes waste removal project two years ahead of schedule May 09, 2016 OAK RIDGE, Tenn. -- The Y-12 National Security Complex has completed disposition of 2,247 containers of mixed waste more than two years ahead of a September 2018 deadline. The waste removal was mandated by the Oak Ridge Reservation Site Treatment Plan through a State of Tennessee Department of Environmental and Conservation Commissioner's order to the U.S. Department of Energy. The

  12. Photovoltaic Device Including A Boron Doping Profile In An I-Type Layer

    DOE Patents [OSTI]

    Yang, Liyou

    1993-10-26

    A photovoltaic cell for use in a single junction or multijunction photovoltaic device, which includes a p-type layer of a semiconductor compound including silicon, an i-type layer of an amorphous semiconductor compound including silicon, and an n-type layer of a semiconductor compound including silicon formed on the i-type layer. The i-type layer including an undoped first sublayer formed on the p-type layer, and a boron-doped second sublayer formed on the first sublayer.

  13. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2013-12-31

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assempbled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting regions of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized slidably receive the male fastener, with all of the connector heads being identical.

  14. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2012-10-23

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  15. Photovoltaic module kit including connector assembly for non-penetrating array installation

    DOE Patents [OSTI]

    Botkin, Jonathan; Graves, Simon; Danning, Matt; Culligan, Matthew

    2011-11-22

    A PV module kit for non-penetrating rooftop installation, including a plurality of PV modules and a plurality of connectors. Each of the PV modules includes a PV laminate and a frame forming a mounting region assembled thereto. The connectors include a male connector having a male fastener extending from a head, and a female connector having a female fastener assembled within a head. The heads are entirely formed of plastic. The kit provides a mounted array state including a junction at which the mounting region of at least two of the PV modules are aligned and interconnected by engagement of the male connector with the female connector. The so-formed junction is substantially electrically insulated. The plurality of connectors can further include a spacer connector including a head forming a bore sized to slidably receive the male fastener, with all of the connector heads being identical.

  16. DOE O 440.1 B, Worker Protection Program for DOE (Including the National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Security Administration) Federal Employees | Department of Energy DOE O 440.1 B, Worker Protection Program for DOE (Including the National Nuclear Security Administration) Federal Employees DOE O 440.1 B, Worker Protection Program for DOE (Including the National Nuclear Security Administration) Federal Employees February 26, 2015 This slide presentation is an outline of some of the most important aspects of DOE Order 440.1B, Worker Protection Program for DOE (Including the National

  17. SBIR/STTR FY16 Phase 1 Release 1 Awards Announced-Includes Four for Fuel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cell Membrane Development | Department of Energy 6 Phase 1 Release 1 Awards Announced-Includes Four for Fuel Cell Membrane Development SBIR/STTR FY16 Phase 1 Release 1 Awards Announced-Includes Four for Fuel Cell Membrane Development January 28, 2016 - 12:36pm Addthis The Energy Department has announced the 2016 Small Business Innovation Research and Small Business Technology Transfer (SBIR/STTR) Phase I Release 1 Awards, including four projects focused on durable and inexpensive polymer

  18. The complete, temperature resolved experimental spectrum of methanol (CH{sub 3}OH) between 560 and 654 GHz

    SciTech Connect (OSTI)

    Fortman, Sarah M.; Neese, Christopher F.; De Lucia, Frank C.

    2014-02-20

    The complete spectrum of methanol (CH{sub 3}OH) has been characterized over a range of astrophysically significant temperatures in the 560.4-654.0 GHz spectral region. Absolute intensity calibration and analysis of 166 experimental spectra recorded over a slow 248-398 K temperature ramp provide a means for the simulation of the complete spectrum of methanol as a function of temperature. These results include contributions from v{sub t} = 3 and other higher states that are difficult to model via quantum mechanical (QM) techniques. They also contain contributions from the {sup 13}C isotopologue in terrestrial abundance. In contrast to our earlier work on semi-rigid species, such as ethyl cyanide and vinyl cyanide, significant intensity differences between these experimental values and those calculated by QM methods were found for many of the lines. Analysis of these differences shows the difficulty of the calculation of dipole matrix elements in the context of the internal rotation of the methanol molecule. These results are used to both provide catalogs in the usual line frequency, linestrength, and lower state energy format, as well as in a frequency point-by-point catalog that is particularly well suited for the characterization of blended lines.

  19. Yakima River Basin Fish Passage Phase II Fish Screen Construction, Project Completion Report.

    SciTech Connect (OSTI)

    Hudson, R. Dennis

    2008-01-01

    On December 5, 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). The Act created the Northwest Power Planning Council (now the Northwest Power and Conservation Council). The Council was charged with the responsibility to prepare a Regional Conservation and Electric Power Plan and to develop a program to protect, mitigate, and enhance fish and wildlife including related spawning grounds and habitat on the Columbia River and its tributaries. The Council adopted its Fish and Wildlife Program on November 15, 1982. Section 800 of the Program addresses measures in the Yakima River Basin. The Yakima measures were intended to help mitigate hydroelectric impacts in the basin and provide off-site mitigation to compensate for fish losses caused by hydroelectric project development and operations throughout the Columbia River Basin. The Bonneville Power Administration (BPA) was designated as a major source of funding for such off-site mitigation measures and was requested to initiate discussions with the appropriate Federal project operators and the Council to determine the most expeditious means for funding and implementing the program. The primary measures proposed for rapid implementation in the Yakima River basin were the installation of fish passage and protective facilities. Sec. 109 of The Hoover Power Plant Act of 1984, authorized the Secretary of the Interior to design, construct, operate, and maintain fish passage facilities within the Yakima River Basin. Under Phase I of the program, improvements to existing fish passage facilities and installation of new fish ladders and fish screens at 16 of the largest existing diversion dams and canals were begun in 1984 and were completed in 1990. The Yakima Phase II fish passage program is an extension of the Phase I program. In 1988, the Yakama Nation (YN) submitted an application to amend Sections 803(b) and 1403(4.5) of the Northwest Power and Conservation Council's Columbia River Basin Fish and Wildlife Program to begin preliminary design on the Phase II fish screen program. Based on citizen and agency endorsement, the Council approved the amendment in 1989. The Council authorized BPA to provide funding for Phase II screens through the Fish and Wildlife Program. BPA then asked the Bureau of Reclamation to provide engineering and design expertise to the Phase II projects.

  20. Quantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG Emissions

    Broader source: Energy.gov [DOE]

    Plenary V: Biofuels and Sustainability: Acknowledging Challenges and Confronting MisconceptionsQuantitative Analysis of Biofuel Sustainability, Including Land Use Change GHG EmissionsJennifer B....