  1. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Energy Savers [EERE]

    January 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, January 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C,...

  2. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Office of Environmental Management (EM)

    February 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, February 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River,...

  3. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, March 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, ...

  4. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PRIME Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by ...

  5. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 5, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts ...

  6. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts ...

  7. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts ...

  8. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, December

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2006 | Department of Energy December 2006 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, December 2006 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding

  9. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, February

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy February 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, February 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding

  10. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, January

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy January 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, January 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding month,

  11. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, March

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2007 | Department of Energy March 2007 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, March 2007 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding month,

  12. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, November

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2006 | Department of Energy November 2006 Mirant Potomac River, LLC, Monthly Model Evaluation Study Report, November 2006 Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding

  13. Exhibit D: Mirant Potomac River Schedule of Operations: January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: ...

  14. Exhibit D: Mirant Potomac River Schedule of Operations: January and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2006 | Department of Energy Operations: January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations: January and February 2006 Docket No. EO-05-01. Exhibit D: Mirant Potomac River Schedule of Operations, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Operations (19.31 KB) More Documents & Publications Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit

  15. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit ...

  16. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River ...

  17. Trona Injection Tests: Mirant Potomac River Station, Unit 1,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Potomac River Generating Station in Alexandria, Virginia Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit ...

  18. Exhibit D: Mirant Potomac River Schedule of Unit Operations:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant ...

  19. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AERMOD-PRIME | Department of Energy PRIME Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Compliance based on highest, second-highest, short-term, and highest annual concentrations. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME (24.52

  20. Microsoft Word - 122006 - Mirant Potomac River LLC - Monthly Model Evaluation Study Nov 2006 - 10350-003-106.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prepared for: Mirant Potomac River, LLC Potomac Generating Station Alexandria, VA Mirant Potomac River, LLC Monthly Model Evaluation Study Report November 2006 ENSR Corporation December 2006 Document No.: 10350-003-106-6 Prepared for: Mirant Potomac River, LLC Potomac Generating Station Alexandria, VA Mirant Potomac River, LLC Monthly Model Evaluation Study Report November 2006 _________________________________ Prepared By: Frank R. Tringale _________________________________ Reviewed By: David

  1. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AERMOD-PRIME, Units 3, 1, 2 SO2 Case | Department of Energy PRIME, Units 3, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case. Compliance based on highest, second-highest, short-term, and highest annual concentrations. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME,

  2. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AERMOD-PRIME, Units 4, 1, 2 SO2 Case | Department of Energy 4, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case. Compliance based on highest, second-highest, short-term, and highest annual concentrations. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2

  3. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AERMOD-PRIME, Units 5, 1, 2 SO2 Case | Department of Energy 5, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 5, 1, 2 SO2 Case Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 5, 1, 2 SO2 Case. Compliance based on highest, second-highest, short-term, and highest annual concentrations. Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 5, 1, 2

  4. Supplement Number 5 to the Operating Plan of Mirant Potomac River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance ...

  5. Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January- March 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations in support of Supplement Number 4 to the Operating Plan of Mirant Potomac River, LLC

  6. Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations, part of Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC

  7. Exhibit D: Mirant Potomac River Schedule of Unit Operations: January- March 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit Operations related to Supplement Number 4 of the Operating Plan of Mirant Potomac River, LLC

  8. Supplement Number 2 to the Operating Plan of Mirant Potomac River...

    Energy Savers [EERE]

    2 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 2 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01. Order No. 202-05-03: Pursuant to...

  9. Mirant Potomac River: DOE Case OE-05-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River: DOE Case OE-05-01 Mirant Potomac River: DOE Case OE-05-01 Written presentation of information regarding the Potomac River power plant that Mirant shared with DOE, PEPCO and PJM at a meeting called by DOE on September 1, 2005. Mirant Potomac River: DOE Case OE-05-01 (232.7 KB) More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Notice of Emergency

  10. Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 23, 2005, Summary Report | Department of Energy Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Docket No. EO-05-01: Trona injection tests were conducted at Mirant's Potomac River Station on Unit 1 between November 12 and December 23, 2005. The purpose of these tests was to determine the capability of dry

  11. Comments of Mirant Potomac River, LLC in Compliance with Order No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    202-06-01 | Department of Energy of Mirant Potomac River, LLC in Compliance with Order No. 202-06-01 Comments of Mirant Potomac River, LLC in Compliance with Order No. 202-06-01 Docket No. EO-05-01: Order No. 202-06-01: Pursuant to Order No. 202-06-1 issued by the Department of Energy ("DOE") on February 17, 2006, Mirant Potomac River, LLC ("Mirant") submits the following comments regarding the operation of the Potomac River Plant ("Plant") during certain days

  12. Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 to the Operating Plan of Mirant Potomac River, LLC Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01:Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC

  13. Notice of Unplanned Outage at the Mirant Potomac River Plant | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice

  14. Letter from Commonwealth to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01: Letter from Commonwealth of Virginia to Mirant Potomac River concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide.

  15. Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance with Order No. 202-05-03 | Department of Energy 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 5 to the Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC §7151(b), and Order No. 202-05-3, issued by the Department of Energy

  16. Letter from Commonwealth to Mirant Potomac River Concerning Serious...

    Broader source: Energy.gov (indexed) [DOE]

    Ambient Air Quality Standards for Sulfur Dioxide. PDF icon Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality ...

  17. Operating Plan of Mirant Potomac River, LLC in Compliance with...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

  18. Update 3 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 and 4 Together

    Broader source: Energy.gov [DOE]

    Docket No. EO-05-01. Docket No. EO-05-01. This report describes dispersion modeling performed for Units 1 and 4 at Mirant's Potomac River Generating Station. The purpose of the modeling was to...

  19. Mirant Reply to Comments re Special Environmental Analysis, DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Station in Alexandria, Virginia Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  20. Comments by Mary Celeste Harris on the Emergency Operation of Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Generating Station. | Department of Energy Mary Celeste Harris on the Emergency Operation of Mirant's Potomac River Generating Station. Comments by Mary Celeste Harris on the Emergency Operation of Mirant's Potomac River Generating Station. Docket No. EO-05-01: Comments by Mary Celeste Harris on the Emergency Operation of Mirant's Potomac River Generating Station. "I am writing in response to your order of December 20, 2005, declaring the emergency operation of Mirant's

  1. Notification to the Commonwealth of Virginia of Mirant's Plan to Shut Down

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Mirant Potomac River Plant | Department of Energy to the Commonwealth of Virginia of Mirant's Plan to Shut Down the Mirant Potomac River Plant Notification to the Commonwealth of Virginia of Mirant's Plan to Shut Down the Mirant Potomac River Plant Docket No. EO-05-01: Mirant's immediate short-term action plan is to shut down all five units at the power plant no later than midnight tonight, August 24,2005 Notification to the Commonwealth of Virginia of Mirant's Plan to Shut Down the

  2. Mirant: Summary of Monitored SO2 Concentrations During Periods...

    Office of Environmental Management (EM)

    Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Mirant Potomac, ...

  3. Mirant Reply to Comments re Special Environmental Analysis, DOE/SEA-04

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Generating Station | Department of Energy Reply to Comments re Special Environmental Analysis, DOE/SEA-04 Potomac River Generating Station Mirant Reply to Comments re Special Environmental Analysis, DOE/SEA-04 Potomac River Generating Station Docket No. EO-05-01: On behalf of Mirant Potomac River LLC ("Mirant"), we respectfully request the opportunity to respond to certain written comments received by the Department of Energy in connection with the Department's

  4. Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant, Modeling Unit 1 Emissions in a Cycling Mode | Department of Energy 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions in a Cycling Mode Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions in a Cycling Mode Docket No. EO-05-01. This report describes dispersion modeling performed for Unit 1 at Mirant's Potomac River Generating

  5. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances December 20, 2005 - 11:44am Addthis DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide

  6. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest

  7. Washington DC Reliability Requirements and the Need to Operate Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) | Department of Energy Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Pursuant to

  8. Response of the Potomac Electric Power Company to the Operating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Comments on Department of Energy's Emergency Order To Resume Limited ...

  9. Response of the Potomac Electric Power Company to the Operating Plan of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mirant Potomac River, L.L.C. | Department of Energy of the Potomac Electric Power Company to the Operating Plan of Mirant Potomac River, L.L.C. Response of the Potomac Electric Power Company to the Operating Plan of Mirant Potomac River, L.L.C. Docket No. EO-05-01: In sum, although Pepco agrees wilh DOE's directive that Mirant "should immediately take the necessary steps to implement Option A of the intermediate phase proposed in the implementation plan,") that Option does not

  10. Update 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant Modeling Baseload Units 3,4,5 | Department of Energy 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 Update 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 Docket No. EO-05-01: This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant's Potomac River Generating Station

  11. Final Report: Particulate Emissions Testing, Unit 1, Potomac River

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Station, Alexandria, Virginia | Department of Energy Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Docket No. EO-05-01: TRC Environmental Corporation (TRC) of Lowell, Massachusetts was retained by Mirant Potomac River, LLC (Mirant) to provide sampling and analytical support in completing a Particulate Emission

  12. Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant, Modeling Unit 1 Emissions at Maximum and Minimum Loads | Department of Energy 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions at Maximum and Minimum Loads Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions at Maximum and Minimum Loads Docket No. EO-05-01. This report describes AERMOD modeling results performed for Unit 1 at

  13. Update 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant, Modeling Unit 4 Emissions at Maximum and Minimum Loads | Department of Energy 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 4 Emissions at Maximum and Minimum Loads Update 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 4 Emissions at Maximum and Minimum Loads Docket No. EO-05-01. This report describes dispersion modeling performed for Unit 4 at

  14. Update 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant: Modeling Cycling Units 1, 2 plus One Baseload Unit | Department of Energy 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling Cycling Units 1, 2 plus One Baseload Unit Update 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling Cycling Units 1, 2 plus One Baseload Unit Docket No. EO-05-01: This report describes dispersion modeling performed for simultaneous operation of one

  15. Letter from Elizabeth Chimento and Poul Hertel, Sullivan Environmental Consultants Review of Mirant Unit 1 Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sent: Monday, December 19, 2005 11:56 AM To: Mansueti, Lawrence Subject: Sullivan Environmental Consultants Review of Mirant Unit 1 Plan Mr. Mansueti, Would you please enter the attached review of the Mirant Unit One Plan in your records for DOE Docket #EO-05-01? Sullivan Environmental Consultants completed this review which Poul Hertel and I commissioned re: ENSR Corp. "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Plant; Modeling Unit 1 Emissions in

  16. Mirant Potomac River; August 24, 2005

    Office of Environmental Management (EM)

  17. Microsoft Word - doe_mirant_order_sierraclub.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20 th , 2006 Mr. Lawrence Mansueti Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr. Mansueti, This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC. For over 50 years, and as indicated by Mirant's own

  18. Pepco Update on Current Construction Work and Mirant Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

  19. Pepco Update on Current Construction Work and Mirant Generation...

    Energy Savers [EERE]

    Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for ...

  20. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Broader source: Energy.gov (indexed) [DOE]

    velocity (or exhaust volume) for each unit; (2) verification that the planned Operating Parameters utilized for Predictive Modeling in the preceding month were not exceeded, or...

  1. Mirant Potomac River, LLC, Monthly Model Evaluation Study Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the MMBtu for each unit and the exit velocity (or exhaust volume) for each unit; (2) ... in MMBtu for each unit and the exit velocity (or exhaust volume) for each unit; and ...

  2. Microsoft Word - 122006 - Mirant Potomac River LLC - Monthly...

    Energy Savers [EERE]

    ... Carolina Ohio Pennsylvania Rhode Island South Carolina Texas Virginia Washington Wisconsin Azerbaijan Belgium Bolivia Brazil China England France Germany Ireland Italy Japan ...

  3. Federal Power Act section 202(c) - Mirant Corporation, August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Power Act section 202(c) - Mirant Corporation, August 2005 Federal Power Act section 202(c) - Mirant Corporation, August 2005 On August 24, 2005 in response to a decision ...

  4. Notification to Mirant by the Commonwealth of Virginia of Serious...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Johnson: DEQ is in receipt of the results of Mirant's "downwash" modeling provided by Mirant to DEQ pursuant to the consent special order between the State Air Pollution Control ...

  5. Notification to Mirant by the Commonwealth of Virginia of Serious

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Violations of the National Ambient Air Quality Standards for Sulfur Dioxide | Department of Energy Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Docket No. EO-05-01: Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National

  6. Notification to Mirant by the Commonwealth of Virginia of Serious...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the National Ambient Air Quality Standards for Sulfur Dioxide Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality ...

  7. Supplemental Comments of David K. Paylor, Director of the Commonwealth...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Potomac River Generation Station Power Plant ("Potomac River Power Plant" or "Plant"), owned by Mirant Potomac River, LLC ("Mirant") and located in Alexandria, Virginia. ...

  8. Notification to the Commonwealth of Virginia of Mirant's Plan...

    Energy Savers [EERE]

    EO-05-01: Mirant's immediate short-term action plan is to shut down all five units at the power plant no later than midnight tonight, August 24,2005 Notification to the ...

  9. Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ambient 24 Hour SO2 Values: Model vs Monitor Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March ...

  10. Potomac River Project Outage Schedule Clarification | Department...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  11. Potomac, Maryland: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    a stub. You can help OpenEI by expanding it. Potomac is a census-designated place in Montgomery County, Maryland.1 Registered Research Institutions in Potomac, Maryland Knowledge...

  12. Mirant Potomac River: DOE Case OE-05-01; September 7, 2005

    Office of Environmental Management (EM)

    September 15, 2010 Printing and Mail Managers Exchange Forum Teleconference Twenty-four individuals participated in the Printing and Mail Managers Exchange Forum, which included Printing and Mail Managers and Contractors. Comments/Additions to last Months Minutes Dallas Woodruff, Headquarters opened the meeting by thanking everyone for participating in the today's teleconference. Printing Agenda Items... Upcoming FY 2010 Department-wide Three-Year Plan Dallas Woodruff, Headquarters informed the

  13. Supplement Number 4 to the Operating Plan of Mirant Potomac River...

    Broader source: Energy.gov (indexed) [DOE]

    Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC 824a(c), Section 301(b) of the Department of Energy Organization Act, 42 USC 7151 (b), and...

  14. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling...

    Energy Savers [EERE]

    Mirant's Potomac River Power Plant" Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Docket No. ...

  15. Update 1 to: A Dispersion Modeling Analysis of Downwash from...

    Broader source: Energy.gov (indexed) [DOE]

    Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions in a Cycling ... Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 and 4 Together ...

  16. Derivation of 24-Hour Average SO2, Background for the Update...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Downwash from Mirant's Potomac River PowerPlant: Modeling Unit 1 Emissions in a Cycling ... Downwash from Mirant's Potomac River Power Plant" Letter from Elizabeth Chimento and ...

  17. Mirant: Summary of Monitored SO2 Concentrations During Periods of Highest

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact | Department of Energy Mirant: Summary of Monitored SO2 Concentrations During Periods of Highest Impact Mirant: Summary of Monitored SO2 Concentrations During Periods of Highest Impact Docket No. EO-05-01: Tables showing a summary of monitored SO2 concentrations during periods of highest impact as well as ERMOD modeling results for SO2 scenarios. Mirant: Summary of Monitored SO2 Concentrations During Periods of Highest Impact (285.92 KB) More Documents & Publications Answer of

  18. Final Report: Particulate Emissions Testing, Unit 1, Potomac...

    Energy Savers [EERE]

    analytical support in completing a Particulate Emission Test of Unit 1 of the Potomac River generating facility. The Test Program at the Potomac facility involved the completion ...

  19. The Potomac Edison Co (Maryland) | Open Energy Information

    Open Energy Info (EERE)

    The Potomac Edison Co Place: Maryland Twitter: @PotomacEdison Outage Map: outages.firstenergycorp.commd References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA...

  20. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  1. Comments on Department of Energy's Emergency Order To Resume Limited

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan | Department of Energy on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Docket No. EO-05-01: Riverkeeper, and the Anacostia Riverkeeper at

  2. Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mirant Potomac River Compliance Plan | Department of Energy Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter documenting Department of Energy receipt of the Mirant Potomac River compliance plan, and informing Mirant that additional comments on the plan would be forthcoming. Docket No. EO-05-01: Letter Documenting

  3. Question and Answer to Procedural Questions on Application for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's ... Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River ...

  4. Preliminary Comments on Compliance Plan and Request for Clarification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  5. Docket No. EO-05-01: Letter Documenting Department of Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  6. Request for Extension of Order No. 202-05-3 of the District of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Order No. 202-06-01 Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  7. Persons Who Received the DC PSC's Emergency Petition and Complaint...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ("DC PSC") Emergency Petition Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  8. Department of Energy Response to Correspondence from Alexandria...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01 Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Support for ...

  9. Comments and Amended Request for Extension of Order No. 202-05...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant ...

  10. Re: Potomac River Generating Station Department of Energy, Case No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits | Department of Energy evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the

  11. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Docket No. ...

  12. Update 6 to: A Dispersion Modeling Analysis of Downwash from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Power Plant Modeling Baseload Units 3,4,5 Update 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload ...

  13. Emergency Petition and Complaint of District of Columbia Public...

    Energy Savers [EERE]

    Complaint to avert the impending shutdown of the Potomac River Generating Station power plant ("Potomac River Plant" or "Plant") owned and operated by Mirant Corporation and its ...

  14. Update 3 to: A Dispersion Modeling Analysis of Downwash from...

    Office of Environmental Management (EM)

    Potomac River Power Plant, Modeling Units 1 and 4 Together Update 3 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Units 1 ...

  15. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this ...

  16. FirstEnergy (Potomac Edison)- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    FirstEnergy (Potomac Edison) offers incentives to Maryland residential customers who are interested in upgrading to more energy efficient appliances and HVAC systems. Rebates are available on...

  17. FirstEnergy (Potomac Edison)- Municipal and Street Lighting Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    FirstEnergy (Potomac Edision) offers several incentives for non-residential and municipal customers to upgrade traffic signals, pedestrian signals, street lights to more efficient  fixtures. The...

  18. Answer of Potomac Electric Power Company and PJM lnterconnection...

    Office of Environmental Management (EM)

    6, 2005 motion filed by the Virginia Department of Environmental Quality Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion ...

  19. Potomac Electric Power Company's Motion for Leave to Answer and...

    Office of Environmental Management (EM)

    Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality

  20. Re: Potomac River Generating Station Department of Energy, Case...

    Office of Environmental Management (EM)

    EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice ...

  1. Re: Potomac River Generating Station Department of Energy, Case...

    Broader source: Energy.gov (indexed) [DOE]

    Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages.

  2. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Environmental Management (EM)

    LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, ... and findings made during the maintenance outages for Pepco's two 230 kV circuits from the ...

  3. Re: Potomac River Generating Station Department of Energy Case...

    Broader source: Energy.gov (indexed) [DOE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Comments on Department of Energy's Emergency Order To Resume Limited ...

  4. Re: Potomac River Generating Station Department of Energy Case...

    Energy Savers [EERE]

    Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. ...

  5. North Potomac, Maryland: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    You can help OpenEI by expanding it. North Potomac is a census-designated place in Montgomery County, Maryland.1 References US Census Bureau 2005 Place to 2006 CBSA...

  6. Re: Potomac River Generating Station Department of Energy Case No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage | Department of Energy PEPCO is providing you with information regarding the planned transmission maintenance outage Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: PEPCO is providing you with information regarding the planned transmission maintenance outage Docket No. EO-05-01. Order No. 202-07-02: Per your request, Potomac Electric Power Company

  7. Notification of Planned 230kV Outage at Potomac River Generating...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  8. Re: Potomac River Generating Station Department of Energy Case No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: Advanced Notice of Power Outages. | Department of Energy Advanced Notice of Power Outages. Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01. Order No. 202-05-03: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming

  9. Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is

  10. Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability.pdf

    Office of Environmental Management (EM)

    Department of Energy Washington Closure Hanford: Ten Years of River Corridor Cleanup Washington Closure Hanford: Ten Years of River Corridor Cleanup December 17, 2015 - 12:30pm Addthis Contract-Timeline-E1511010_4-B_756px.jpg This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site River Corridor Achievements

  11. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection, LLC | Department of Energy Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two

  12. FirstEnergy (Potomac Edison)- Commercial and Industrial Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    FirstEnergy company Potomac Edison offers rebates to eligible commercial, industrial, governmental, and institutional customers in Maryland service territory who are interested in upgrading to...

  13. The Institute for Public Representation, on behalf of the Potomac

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Riverkeeper, Inc., the Patuxent Riverkeeper, and the Anacostia Riverkeeper at Earth Conservation Corps Comments on Department of Energy's Special Environmental Analysis Regarding Operatio | Department of Energy The Institute for Public Representation, on behalf of the Potomac Riverkeeper, Inc., the Patuxent Riverkeeper, and the Anacostia Riverkeeper at Earth Conservation Corps Comments on Department of Energy's Special Environmental Analysis Regarding Operatio The Institute for Public

  14. Motion for Leave to Answer and Answer of Potomac Electric Power Company |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Answer and Answer of Potomac Electric Power Company Motion for Leave to Answer and Answer of Potomac Electric Power Company Docket No. EO-05-01: Pursuant to Rule 213 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") hereby moves for leave to answer and answers the Motion for Leave to File Consolidated Answer and Consolidated Answer of Robert G. Burnley, Director of the Commonwealth of Virginia

  15. Notification of Planned 230kV Outage at Potomac River Generating Station |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will begin at 4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. Notification of Planned 230kV Outage at Potomac River Generating Station (34.76 KB) More Documents & Publications Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned

  16. Information Concerning Reliability Impacts under Various System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configurations of the Mirant Potomac River Plant | Department of Energy Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions

  17. Supplemental Comments on the Department of Energy's Emergency Order To

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resume Operation at Mirant's Potomac River Generating Station | Department of Energy on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Supplemental Comments on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Docket No. EO-05-01: The Institute for Public Representation, on behalf of the Anacostia Riverkeeper at Earth Conservation Corps, the Patuxent Riverkeeper, and the

  18. Letter from Commonwealth of Virginia to ENSR International Detailing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC | Department of Energy of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Letter from Commonwealth of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Docket No. EO-05-01: Letter from

  19. Tuba City Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Environmental Management (EM)

    December 23, 2005, Summary Report | Department of Energy Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report Docket No. EO-05-01: Trona injection tests were conducted at Mirant's Potomac River Station on Unit 1 between November 12 and December 23, 2005. The purpose of these tests was to determine the capability of dry

  20. Microsoft Word - UPDATE 5 - Units 1,2 + base load unit.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Cycling Units 1, 2 plus One Baseload Unit ENSR Corporation January 6, 2006 Document Number 10350-002-420 (Update 5) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of one baseload unit and two cycling units at Mirant's Potomac River Generating Station (PRGS). This mode of operation is also referred to as Option A in Mirant Potomac

  1. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To ... The next planned outage on 23106 high voltage circuit between xxxxxxx xx xxxx and ...

  2. Notification of Planned 230kV Outage at Potomac River Generating...

    Energy Savers [EERE]

    Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. ...

  3. Audit Report Timeline | Department of Energy

    Office of Environmental Management (EM)

    Plan for 2009-2010 Association of Home Appliance Manufacturers (AHAM) Ex parte Memo Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006...

  4. Request from City of Alexandria for Public Disclosure of Documents...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01 More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed ...

  5. Department of Energy Response to Correspondence from Mary Celeste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01 Comments by Mary Celeste Harris on the Emergency Operation of Mirant's Potomac River Generating Station. Comments on Department of Energy's Emergency Order To Resume ...

  6. Update 5 to: A Dispersion Modeling Analysis of Downwash from...

    Energy Savers [EERE]

    River Power Plant: Modeling Cycling Units 1, 2 plus One Baseload Unit Update 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant: Modeling ...

  7. Washington DC Reliability Requirements and the Need to Operate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) ...

  8. Commonwealth of Virginia, State Air Pollution Control Board,...

    Energy Savers [EERE]

    Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Commonwealth of Virginia, State Air ...

  9. Comments on Emergency Order to Resume Limited Operation at the Potomac

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. | Department of Energy on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Docket No. EO-05-01: This letter is in response to the Department of Energy Emergency

  10. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Potomac River Generating Station power plant ("Potomac River Plant" or "Plant"). ... That letter merely directs Mirant to provide VDEQ with "a summary of the 5 Id. at 9. 6 ...

  11. Potomac Electric Power Company's Motion for Leave to Answer and Answer to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments and Protests | Department of Energy for Leave to Answer and Answer to Comments and Protests Potomac Electric Power Company's Motion for Leave to Answer and Answer to Comments and Protests Docket No. EO-05-01: Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco") hereby (i) moves for

  12. Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance with Order No. 202-05-03 | Department of Energy 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy

  13. Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the October 6, 2005 motion filed by the Virginia Department of Environmental Quality | Department of Energy Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of Environmental Quality Docket No. EO-05-01: Pursuant to Rule 213 of the rules of Practice

  14. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Office of Energy Efficiency and Renewable Energy (EERE)

    Docket No. EO-05-01. Order No. 202-07-02: Pursuant to the Department of Energy's Order No. 202-05-3 issued December 20, 2005 ("DOE Potomac River Order"), Pepco has filed notice of the planned...

  15. Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

    Broader source: Energy.gov [DOE]

    Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

  16. Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Mirant Potomac River, LLC | Department of Energy Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Docket No. EO-05-01. In summary, PJM understands the difficulty facing the Department in having to balance the important conflicting interests presented here. However, PJM does not regard Option A as anywhere close to striking the correct balance.

  17. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of Downwash from Mirant's Potomac River Power Plant" | Department of Energy Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Docket No. EO-05-01. Sullivan Environmental Consulting, Inc. has prepared a review of the "Update 1 to: A Dispersion

  18. Community Action Partnership of San Bernardino County Š Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009, OAS-RA-13-17

    Energy Savers [EERE]

    Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 | Department of Energy Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Docket No. EO-05-01: This is a Consent Order issued under the authority of Va. Code § § 10.1-1307D and 10.1-1307.1, between the

  19. Revolving Loan Funds and Loan Loss Reserves | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Analysis of Downwash from Mirant's Potomac River Power Plant" | Department of Energy Docket No. EO-05-01. Sullivan Environmental Consulting, Inc. has prepared a review of the "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" written by ENSR Corporation on behalf of the Mirant Potomac River Power Plant. This report models only Unit #1 operating under two daytime only scenarios to reduce exposures and meet the National Ambient Air

  20. Commonwealth of Virginia, State Air Pollution Control Board, Order by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 | Department of Energy Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Docket No. EO-05-01: This is a Consent Order issued under the authority of Va. Code § § 10.1-1307D and 10.1-1307.1, between the

  1. Potomac Electric Power Company's Motion to Intervene and Comment in Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Emergency Petition and Complaint | Department of Energy to Intervene and Comment in Support of Emergency Petition and Complaint Potomac Electric Power Company's Motion to Intervene and Comment in Support of Emergency Petition and Complaint Docket No. EO-05-01. Docket No. EL05-145-000: Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.211 and 385.214 (2004),

  2. Potomac River Generating Station Dept. of Energy Case No. EO-05-01; September 8, 2005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Craig A. Glazer Vice President - Federal Government Policy PJM Washington Office (202) 393-7756 .FAX (202) 393-7741 e-mail: glazec@pjm.com CRITICAL ENERGY INFRASTRUCTURE INFORMATION HAS BEEN REMOVED FROM THIS SUBMITTAL FOR PRIVILEGED TREATMENT September 8, 2005 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Dept. of Energy Case No. EO-05-01 Dear Mr.

  3. Microsoft Word - 46ED31B8-1E53-08CF52.doc

    Office of Environmental Management (EM)

    News Media Contact(s): Julie Ruggiero OR Craig Stevens 202/586-4940 For Immediate Release December 20, 2005 DOE Orders Mirant Power Plant to Operate Under Limited Circumstances DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric

  4. Microsoft Word - 3A47553C.htm

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Media Contact(s): Julie Ruggiero OR Craig Stevens 202/586-4940 For Immediate Release December 20, 2005 DOE Orders Mirant Power Plant to Operate Under Limited Circumstances DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric

  5. Comments by Mary Celeste Harris on the Emergency Operation of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO-05-01: Comments by Mary Celeste Harris on the Emergency Operation of Mirant's Potomac River Generating Station. "I am writing in response to your order of December 20, 2005, ...

  6. Update 4 to: A Dispersion Modeling Analysis of Downwash from...

    Broader source: Energy.gov (indexed) [DOE]

    Update 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 4 Emissions at Maximum and Minimum Loads (168.95 KB) More Documents & ...

  7. Update 2 to: A Dispersion Modeling Analysis of Downwash from...

    Broader source: Energy.gov (indexed) [DOE]

    Update 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant, Modeling Unit 1 Emissions at Maximum and Minimum Loads (185.07 KB) More Documents & ...

  8. Letter from Elizabeth Chimento and Poul Hertel to the Federal...

    Office of Environmental Management (EM)

    Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Letter from Elizabeth Chimento and Poul Hertel to ...

  9. Department of Energy Order No. 202-07-1 | Department of Energy

    Office of Environmental Management (EM)

    Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Notice of Unplanned Outage at the Mirant ...

  10. Attachment C … Waste Analysis Plan

    Office of Environmental Management (EM)

    Configurations | Department of Energy Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Docket No. EO-05-01: Attachment to the Operating Plan of Mirant Potomac River, LLC Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations (28.18 KB) More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME

  11. Attachment A: Modeling in Support of Additional Two-Unit Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configurations | Department of Energy Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations Docket No. EO-05-01: Attachment to the Operating Plan of Mirant Potomac River, LLC Attachment A: Modeling in Support of Additional Two-Unit Operating Configurations (28.18 KB) More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME

  12. Microsoft Word - UPDATE 4 - Unit 4.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 4 Emissions at Maximum and Minimum Loads ENSR Corporation December 23, 2005 Document Number 10350-002-410 (Update 4) December, 2005 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for Unit 4 at Mirant's Potomac River Generating Station. The modeling was performed according to the Protocol approved by the Virginia Department of Environmental Quality. The purpose of the

  13. DOE Cybersecurity Awareness Program

    Broader source: Energy.gov [DOE]

    The OCIO supports a variety of cybersecurity awareness activities that impress upon DOE employees the importance of cybersecurity and the adverse consequences of its failure. The primary purpose of awareness activities is to enhance the 'general awareness and understanding' of current cyber threats and recommended mitigations as well as to cultivate a computing environment where cybersecurity behaviors and responses are automatic and consistent.

  14. mirant_010306.pdf

    Office of Environmental Management (EM)

    3 AUDIT REPORT REVIEW OF THE U.S. DEPARTMENT OF ENERGY'S INFORMATION MANAGEMENT SYSTEMS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUGUST 1998 August 10, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "Review of the U.S. Department of Energy's Information Management Systems" BACKGROUND The Federal emphasis on reinventing Government and the end of the Cold War have driven

  15. mirant_010406.pdf

    Office of Environmental Management (EM)

  16. mirant_010906.pdf

    Office of Environmental Management (EM)

  17. mirant_011306.pdf

    Office of Environmental Management (EM)

  18. mirant_020906.pdf

    Office of Environmental Management (EM)

  19. mirant_032006.pdf

    Office of Environmental Management (EM)

  20. mirant_041806.pdf

    Office of Environmental Management (EM)

  1. mirant_060206.pdf

    Office of Environmental Management (EM)

  2. mirant_091704.pdf

    Office of Environmental Management (EM)

  3. mirant_092305.pdf

    Office of Environmental Management (EM)

  4. mirant_101205.pdf

    Office of Environmental Management (EM)

  5. mirant_110805.pdf

    Office of Environmental Management (EM)

  6. mirant_111105.pdf

    Office of Environmental Management (EM)

  7. mirant_112305.pdf

    Office of Environmental Management (EM)

  8. DOE Cybersecurity Awareness Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Awareness Program DOE Cybersecurity Awareness Program security-265130960720.jpg The Cybersecurity Awareness and Training (CSAT) Program team coordinates cybersecurity awareness ...

  9. National Energy Awareness Month

    Broader source: Energy.gov [DOE]

    October is National Energy Awareness Month. It's also a chance to talk about our country’s energy security and its clean energy future.

  10. Postdoc capability awareness AOT

    SciTech Connect (OSTI)

    Erickson, John L.

    2015-12-18

    This is a summary of the LANL accelerator operations and technology division prepared for the postdoc programmatic capability awareness workshop in engineering and applied sciences.

  11. Fraud Awareness Briefings

    Broader source: Energy.gov [DOE]

    With the passage of the American Recovery and Reinvestment Act of 2009, the Office of Inspector General expanded its fraud awareness briefing program. During these presentations to Department...

  12. National Cybersecurity Awareness Month

    Office of Energy Efficiency and Renewable Energy (EERE)

    Every October, the Department of Energy joins the Department of Homeland Security (DHS) and others across the country in support of National Cybersecurity Awareness Month and the “Stop. Think. Connect.” campaign. This year marks the tenth year of the cybersecurity awareness campaign.

  13. Disability Employment Awareness Month

    Broader source: Energy.gov [DOE]

    Utilizing the talents of all Americans is essential for our Nation to out-innovate, out-educate, and out-build the rest of the world.  During National Disability Employment Awareness Month, we...

  14. Year 2000 awareness

    SciTech Connect (OSTI)

    Holmes, C.

    1997-11-01

    This report contains viewgraphs on the challenges business face with the year 2000 software problem. Estimates, roadmaps, virtual factory software, current awareness, and world wide web references are given.

  15. Cybersecurity Awareness Materials

    Broader source: Energy.gov [DOE]

    The OCIO develops and distributes a variety of materials to enhance cyber awareness campaigns, address emerging cyber threats, and examine hot topics. These materials are available to all DOE organizations, and public and private institutions.

  16. Quarterly Cybersecurity Awareness Campaigns and Toolkits | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Cybersecurity Awareness Campaigns and Toolkits Quarterly Cybersecurity Awareness Campaigns and Toolkits The OCIO coordinates quarterly cybersecurity awareness campaigns ...

  17. January 2015 Cybersecurity Awareness Campaign - Phishing | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Cybersecurity Awareness Campaign - Phishing January 2015 Cybersecurity Awareness Campaign - Phishing More Documents & Publications July 2014 Cybersecurity Awareness Campaign - ...

  18. Energy Aware Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partnerships Shifter: User Defined Images Archive APEX Home » R & D » Energy Aware Computing Energy Aware Computing Dynamic Frequency Scaling One means to lower the energy required to compute is to reduce the power usage on a node. One way to accomplish this is by lowering the frequency at which the CPU operates. However, reducing the clock speed increases the time to solution, creating a potential tradeoff. NERSC continues to examine how such methods impact its operations and its

  19. This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Genera

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 7 th , 2007 Anthony J. Como Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr.Como: This letter is in response to the Department of Energy Special Environmental Analysis for Actions Taken under the U.S Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia. Air Quality impacts This study

  20. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Awareness Records and Activity Reports Operational Awareness Records and Activity Reports December 10, 2015 Enterprise Assessments Operational Awareness Record for the...

  1. Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 | Department of Energy Hertel, Sullivan Environmental Consultants Review of Mirant Unit 1 Plan (20.06 KB) More Documents & Publications Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory

  2. DOE2016_Socioeconomic_Programs_HUBZone

    Office of Environmental Management (EM)

    μm in aerodynamic diameter (PM 10 ). As a result of the study, on August 19, 2005, the Virginia Department of Environmental Quality (VDEQ) issued a letter to Mirant requesting that Mirant "undertake such action as is necessary to ensure protection of human health and the environment, in the area surrounding the Potomac River Generating Station, including the potential reduction of levels of operation, or potential shutdown of the facility." On August 24, 2005, in response to VDEQ's

  3. July 2014 Cybersecurity Awareness Campaign - Internet Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2014 Cybersecurity Awareness Campaign - Internet Safety July 2014 Cybersecurity Awareness Campaign - Internet Safety More Documents & Publications January 2015 Cybersecurity ...

  4. Earthjustice, Appliance Standards Awareness Project, Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earthjustice, Appliance Standards Awareness Project, Natural Resources Defense Council - ... Earthjustice, Appliance Standards Awareness Project, Natural Resources Defense Council - ...

  5. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness Record, Waste ...

  6. mirant_010306_3.pdf

    Office of Environmental Management (EM)

  7. mirant_010306_a.pdf

    Office of Environmental Management (EM)

  8. mirant_010306_e.pdf

    Office of Environmental Management (EM)

  9. mirant_010306_pepco.pdf

    Office of Environmental Management (EM)

  10. mirant_010606_3.pdf

    Office of Environmental Management (EM)

  11. mirant_010606_4.pdf

    Office of Environmental Management (EM)

  12. mirant_012006_1.pdf

    Office of Environmental Management (EM)

  13. mirant_012006_3.pdf

    Office of Environmental Management (EM)

  14. mirant_012006_4.pdf

    Office of Environmental Management (EM)

  15. mirant_012006_5.pdf

    Office of Environmental Management (EM)

  16. mirant_012006_b.pdf

    Office of Environmental Management (EM)

  17. mirant_012006_c.pdf

    Office of Environmental Management (EM)

  18. mirant_012006_d.pdf

    Office of Environmental Management (EM)

  19. mirant_012006_e.pdf

    Office of Environmental Management (EM)

  20. mirant_012006_f.pdf

    Office of Environmental Management (EM)

  1. mirant_012606_a.pdf

    Office of Environmental Management (EM)

  2. mirant_012606_b.pdf

    Office of Environmental Management (EM)

  3. mirant_020706_b.pdf

    Office of Environmental Management (EM)

  4. mirant_021706_1.pdf

    Office of Environmental Management (EM)

  5. mirant_022106_c.pdf

    Office of Environmental Management (EM)

  6. mirant_032406_a.pdf

    Office of Environmental Management (EM)

  7. mirant_032406_c.pdf

    Office of Environmental Management (EM)

  8. mirant_032406_d.pdf

    Office of Environmental Management (EM)

  9. mirant_032406_e.pdf

    Office of Environmental Management (EM)

  10. Operational Issues at the Environmental Restoration Disposal Facility at Hanford

    Office of Environmental Management (EM)

    Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� (41.73 KB) More Documents & Publications Operating Guidelines Appendix A B.DOC� DOE HR Guidebook 12_15_05.DOC� Questions and Answers 202-05-03 | Department of Energy

    Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03

  11. Microsoft Word - Final Update 6 - UNits 345.DOC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 ENSR Corporation January 13, 2006 Document Number 10350-002-420 (Update 6) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant's Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hours and minimum load (35 MW) 12 hours or

  12. Microsoft Word - UPDATE 2 - Unit 1.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 1 Emissions at Maximum and Minimum Loads ENSR Corporation December 20, 2005 Document Number 10350-002-410 (Update 2) December, 2005 1-1 1.0 INTRODUCTION This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day at loads from 35 MW to 88 MW with the use

  13. Cybersecurity Awareness Materials | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cybersecurity Awareness Materials Cybersecurity Awareness Materials Open book on top of an open computer. Open book on top of an open computer. The OCIO develops and distributes a ...

  14. Enterprise Assessments Operational Awareness Record of Observations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enterprise Assessments Operational Awareness Record of Observations of the Design and ... March 2016 Enterprise Assessments Operational Awareness Record of Observations of the ...

  15. National Cybersecurity Awareness Month (NCSAM) Campaigns | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Cybersecurity Awareness Month (NCSAM) Campaigns National Cybersecurity Awareness Month (NCSAM) Campaigns HEISCFaceBookBanner2.jpg October is National Cybersecurity ...

  16. Cybersecurity Awareness Electronic Messaging | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electronic Messaging Cybersecurity Awareness Electronic Messaging The OCIO CSAT team ... or public and private institutions to enhance site-specific awareness programs. ...

  17. National Cybersecurity Awareness Month | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 1, 2014 - 8:44am Addthis National Cybersecurity Awareness Month The White House has designated October as National Cybersecurity Awareness Month (NCSAM) in which the ...

  18. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    Awareness Record, Waste Treatment and Immobilization Plant - December 2014 December 2014 Operational Awareness Record for the Observation of Waste Treatment and ...

  19. Exhibit A: Modeling in Support of Two Unit Operating Configurations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Modeling in Support of Two Unit Operating Configurations Exhibit A: Modeling in Support of Two Unit Operating Configurations Docket No. EO-05-01: Tables showing modeling of emissions from units of the Mirant Potomac Power Plant. Exhibit A: Modeling in Support of Two Unit Operating Configurations (257.69 KB) More Documents & Publications Comments on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake

  20. How Will You Observe Energy Awareness Month?

    Broader source: Energy.gov [DOE]

    Learn more about Energy Awareness Month and how you can download or order materials to help spread the word.

  1. Headquarters Facilities Master Security Plan- Chapter 10, Security Awareness Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program Describes the DOE Headquarters Security Awareness Program

  2. National Cybersecurity Awareness Month (NCSAM) Campaigns

    Broader source: Energy.gov [DOE]

    Each year the OCIO recognizes October as National Cybersecurity Awareness Month or NCSAM. This awareness event is a collaborative effort with the Department of Homeland Security and other federal, state, and local government agencies to raise awareness about current cybersecurity threats and mitigation strategies, as well as Departmental cyber initiatives. The primary goal of NCSAM is to provide the general user with the knowledge and resources needed to stay safer and more secure online.

  3. Thinking"" telescopes for autonomous space situational awareness...

    Office of Scientific and Technical Information (OSTI)

    Conference: Thinking"" telescopes for autonomous space situational awareness Citation Details In-Document Search Title: Thinking"" telescopes for autonomous space situational...

  4. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    systems of the Waste Treatment and Immobilization Plant Low Activity Waste Facility. ... Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 ...

  5. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    waste system of the Waste Treatment and Immobilization Plant Low Activity Waste Facility. ... Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 ...

  6. Enterprise Assessments - Operational Awareness Record of the...

    Energy Savers [EERE]

    Isolation Pilot Plant Horizon-14 Exercise - January 2015 Enterprise Assessments - Operational Awareness Record of the Observation of the Waste Isolation Pilot Plant Horizon-14 ...

  7. Enterprise Assessments Operational Awareness Record, Waste Isolation...

    Office of Environmental Management (EM)

    Record, Waste Isolation Pilot Plant - March 2015 Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015 Review of the Waste ...

  8. Enterprise Assessments Operational Awareness Record, Argonne...

    Office of Environmental Management (EM)

    and New Brunswick Laboratory - March 2015 Enterprise Assessments Operational Awareness Record, Argonne National Laboratory and New Brunswick Laboratory - March 2015 March...

  9. Hanford Beryllium Awareness Group (BAG) - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Wide Programs Beryllium Program Hanford Beryllium Awareness Group (BAG) About Us Hanford Cultural Resources Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities

  10. Quarterly Cybersecurity Awareness Campaigns and Toolkits

    Broader source: Energy.gov [DOE]

    The OCIO coordinates a variety of internal cybersecurity awareness campaigns to provide DOE employees with timely information on current cyber threats, recommended mitigations, and sound practices. The OCIO also develops and distributes cyber awareness information and resources to enhance employees' general knowledge of cybersecurity practices, policies, and terms.

  11. Appliance Standards Awareness Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Standards Awareness Project Appliance Standards Awareness Project On January 14, representatives of energy efficiency advocates and fan manufacturers met to describe technical considerations related to fan efficiency with DOE. ex parte memo for Jan 15 (36.82 KB) BSQ-300 (1) (718.08 KB) More Documents & Publications Ex parte communication Ex parte communication NRDC Ex Parte Communication

  12. Mirant Energy Trading, LLC | Open Energy Information

    Open Energy Info (EERE)

    Form 861 Data Utility Id 55758 Utility Location Yes Ownership W Activity Wholesale Marketing Yes This article is a stub. You can help OpenEI by expanding it. Utility Rate...

  13. April 2014 Cybersecurity Awareness Campaign- Malware

    Office of Energy Efficiency and Renewable Energy (EERE)

    The April 2014 Cyber Awareness Campaign, "What is Malware?"  introduced DOE employees to the dangers of malware and provided tips for staying safe online.

  14. Earthjustice, Appliance Standards Awareness Project, Natural Resources

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Council - Comments in response to DOE solicitation of views on the implementation of test procedure waivers for large capacity clothes washers | Department of Energy Earthjustice, Appliance Standards Awareness Project, Natural Resources Defense Council - Comments in response to DOE solicitation of views on the implementation of test procedure waivers for large capacity clothes washers Earthjustice, Appliance Standards Awareness Project, Natural Resources Defense Council - Comments in

  15. Tour NREL Facilities During Energy Awareness Month

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Facilities During Energy Awareness Month For more information contact: e:mail: Public Affairs Golden, Colo., Sept. 30, 1999 — Celebrate Energy Awareness Month in October by discovering the power of clean energy at the U.S. Department of Energy's National Renewable Energy Laboratory (NREL). The nation's premier laboratory for renewable energy and energy efficiency research, development and deployment, NREL offers guests a glimpse into a bright future powered by the sun, wind and plant

  16. Energy Department Opens National Competition to Advance Awareness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opens National Competition to Advance Awareness on Geothermal Energy Energy Department Opens National Competition to Advance Awareness on Geothermal Energy February 28, 2014 - ...

  17. Data, Feedback, & Awareness Lead to Big Energy Savings

    Broader source: Energy.gov (indexed) [DOE]

    Data, Feedback, & Awareness Lead to Big Energy Savings The Navy Region Southwest Metro San ... organized energy awareness program centered on energy data gathering and distribution. ...

  18. Cybersecurity Information Awareness Day Survival Guide and Checklist

    Broader source: Energy.gov [DOE]

    The Cybersecurity Information Awareness Day Survival Guide and Checklist was developed as a resource to assist organizations with planning and coordinating a cyber awareness event or campaign.

  19. PRESS RELEASE: Community Leaders Institutes (CLIs) Promote Awareness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PRESS RELEASE: Community Leaders Institutes (CLIs) Promote Awareness of Climate Change Impacts PRESS RELEASE: Community Leaders Institutes (CLIs) Promote Awareness of Climate Change ...

  20. An Advanced Framework for Improving Situational Awareness in...

    Office of Scientific and Technical Information (OSTI)

    Situational Awareness in Electric Power Grid Operation Citation Details In-Document Search Title: An Advanced Framework for Improving Situational Awareness in Electric Power ...

  1. Cybersecurity Awareness & Training Warehouse | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training » Cybersecurity Awareness & Training Warehouse Cybersecurity Awareness & Training Warehouse The words "New Skill," written on a chalk board. The words "New Skill," written on a chalk board. Cybersecurity Awareness & Training The Office of the Chief Information officer (OCIO) has developed an online repository to provide the public with free and direct access to cyber training and awareness resources. The Cybersecurity Awareness & Training Warehouse

  2. Golden Field Office Disability Awareness Month Event

    Broader source: Energy.gov [DOE]

    Come join us for a Disability Awareness Month program on Monday, October 29, 2012 in Bldg. 17, 4th floor, from 10:00-11:00 am.   We will have a couple  of performers from a Theatre group named...

  3. Microsoft Word - ex parte com_10052010.doc

    Office of Environmental Management (EM)

    20 th , 2006 Mr. Lawrence Mansueti Permitting, Siting, and Analysis Division Office of Electricity Delivery and Energy Reliability Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Dear Mr. Mansueti, This letter is in response to the Department of Energy Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, DC. For over 50 years, and as indicated by Mirant's own

  4. Exhibit A: ENSR Modeling in Support of Individual Unit Operation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy A: ENSR Modeling in Support of Individual Unit Operation Exhibit A: ENSR Modeling in Support of Individual Unit Operation Docket No. EO-05-01: Exhibit A: ENSR Modeling in Support of Individual Unit Operation, part of Supplement Number 3 to the Operating Plan of Mirant Potomac River, LLC Exhibit A: ENSR Modeling in Support of Individual Unit Operation (154.63 KB) More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited

  5. Waste minimization and pollution prevention awareness plan

    SciTech Connect (OSTI)

    Not Available

    1991-05-31

    The purpose of this plan is to document the Lawrence Livermore National Laboratory (LLNL) Waste Minimization and Pollution Prevention Awareness Program. The plan specifies those activities and methods that are or will be employed to reduce the quantity and toxicity of wastes generated at the site. The intent of this plan is to respond to and comply with (DOE's) policy and guidelines concerning the need for pollution prevention. The Plan is composed of a LLNL Waste Minimization and Pollution Prevention Awareness Program Plan and, as attachments, Program- and Department-specific waste minimization plans. This format reflects the fact that waste minimization is considered a line management responsibility and is to be addressed by each of the Programs and Departments. 14 refs.

  6. Energy awareness luncheon and energy seminar

    SciTech Connect (OSTI)

    1980-07-23

    A separate abstract was prepared for each of the following: the luncheon address, energy-growth-freedom by Kenneth A. Randall; the keynote commentary, by F.S. Patton, program chairman; and four current-awareness papers on the future of oil and gas, coal, nuclear energy, and solar energy. In addition, in a section, Speaking of Energy, very brief statements by eight professional engineers on the energy challenge are included. Also, the NSPE position paper on energy policy is included.

  7. Aware of the risks, the Federal Aviation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aware of the risks, the Federal Aviation Administration (FAA) in 2013 announced a new policy that calls for quantified analysis of potential ocular hazards from glint and glare for PV installations planned at airports-and other organizations are calling for similar analyses. Commercial ray-tracing tools can be used to model glare occurrences, but are expensive and complicated to set-up, placing a significant burden on companies seeking to comply with the FAA requirement. New Tool Helps Private

  8. Suspect/Counterfeit Item Awareness Training Manual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suspect/Counterfeit Items Awareness Training U.S. Department of Energy Health, Safety and Security Office of Corporate Safety Analysis This training document is in the process of being revised by the Office of Analysis (HS-24) through a partnership with the Energy Facility Contractors Group. In the interim, the Suspect/ Counterfeit Headmark List (page 11) has been updated with the most current version. June 2007 Revision 6 Suspect/Counterfeit Items Training Sponsored by the Office of Analysis

  9. Increasing Solar Energy Awareness in El Paso | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Increasing Solar Energy Awareness in El Paso Increasing Solar Energy Awareness in El Paso October 3, 2012 - 2:30pm Addthis Members of the community gathered to celebrate the ...

  10. ARM West Antarctic Radiation Experiment (AWARE) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J Verlinde DH ... DOESC-ARM-15-040 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J ...