National Library of Energy BETA

Sample records for average installed capital

  1. Advances in Energy Efficiency, Capital Cost, and Installation Schedules for Large Capacity Cooling Applications Using a Packaged Chiller Plant Approach 

    E-Print Network [OSTI]

    Pierson, T. L.; Andrepont, J. S.

    2003-01-01

    include: 1) dramatic reductions in unit capital costs of installed chiller plant capacity on a dollar per ton basis, 2) marked improvements in total procurement and installation schedules, 3) significantly smaller space requirements, and 4) enhanced...

  2. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    SciTech Connect (OSTI)

    Doyle, C.; Truitt, A.; Inda, D.; Lawrence, R.; Lockhart, R.; Golden, M.

    2015-03-01

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

  3. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01

    on U.S. Wind Power Installation, Cost, and Performanceand Capital Costs Drive Wind Power Prices. . . . . 14in installed wind project costs, wind turbine transaction

  4. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  5. Hopper Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and a host of other scientific endeavors. 00.JPG Delivery 1.JPG Unloading 3.JPG Earthquake protection 4.JPG Installing cabinets 6.JPG Half way there 8.JPG Inspection and...

  6. Coherent Averaging

    E-Print Network [OSTI]

    Julien M. E. Fraïsse; Daniel Braun

    2015-04-13

    We investigate in detail a recently introduced "coherent averaging scheme" in terms of its usefulness for achieving Heisenberg limited sensitivity in the measurement of different parameters. In the scheme, $N$ quantum probes in a product state interact with a quantum bus. Instead of measuring the probes directly and then averaging as in classical averaging, one measures the quantum bus or the entire system and tries to estimate the parameters from these measurement results. Combining analytical results from perturbation theory and an exactly solvable dephasing model with numerical simulations, we draw a detailed picture of the scaling of the best achievable sensitivity with $N$, the dependence on the initial state, the interaction strength, the part of the system measured, and the parameter under investigation.

  7. 2011 Strategic Capital Discussions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2010 IPR 2009 IPR 2008 Capital Investment Review CIR 2012 Quarterly Business Review 2011 Strategic Capital Discussions Access to Capital Debt Optimization Asset Management Cost...

  8. Taxation and Capital Spending Alan J. Auerbach

    E-Print Network [OSTI]

    Sadoulet, Elisabeth

    of new capital, r is the firm's nominal cost of funds (presumably a weighted average of debt and equity system of capital income taxation is so complex, leading to misallocation and hence effective reductions the object of frequent tax policy initiatives, the most recent being the temporary "bonus depreciation

  9. Sandia Energy - Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Installation Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Installation InstallationTara Camacho-Lopez2015-03-20T19:23:2...

  10. software installation page

    E-Print Network [OSTI]

    Installing software used in CS/MA 615. There are sources for various software packages. Gambit web site. You can download install packages for Windows and

  11. Venture Capital Finance

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Venture Capital Finance Brian Baynes, Partner, Flagship Ventures

  12. Note on "Venture Capital"

    E-Print Network [OSTI]

    Kenney, Martin

    2000-01-01

    venture capital excludes buyouts, loans, and other financialconcentrating upon management buyouts, bridge financing,

  13. Installation and Acceptance Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses activities required to install the software, data bases, or data that comprise the software product onto the hardware platform at sites of operation.

  14. MSU CAPITAL ASSET POLICY 1. CAPITALIZATION POLICY and USEFUL LIFE: MSU records as capital assets those

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    , museum and related items not meeting the above criteria are capitalized at cost or our best estimateMSU CAPITAL ASSET POLICY 1. CAPITALIZATION POLICY and USEFUL LIFE: MSU records as capital assets those assets that meet its formal capitalization policy. The capitalization policy is as follows: TYPE

  15. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    3 05-27-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW STAKEHOLDER MEETING 3 PETROLEUM TRANSMISSION, STORAGE AND DISTRIBUTION ISSUES...

  16. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATE OF AMERICA DEPARTMENT OF ENERGY ---: : IN RE: : : QUADRENNIAL ENERGY REVIEW : : NEW...

  17. Client Configuration and Installation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Instructions below. In certain environments (e.g., if your installation is on a machine which has more than one network interface or has a high bandwidth network connection...

  18. Neutron resonance averaging

    SciTech Connect (OSTI)

    Chrien, R.E.

    1986-10-01

    The principles of resonance averaging as applied to neutron capture reactions are described. Several illustrations of resonance averaging to problems of nuclear structure and the distribution of radiative strength in nuclei are provided. 30 refs., 12 figs.

  19. CAPITAL ASSET DOCUMENT TRAINING

    E-Print Network [OSTI]

    KUALI CAPITAL ASSET MANAGEMENT DOCUMENT TRAINING Business and Financial Services, Property Definitions of Asset Management roles What is a CAM Processor and why do we designate that authority? Department Property Contact role What is a movable capital asset? #12;Property Management We are here

  20. New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01

    Tracks a Decade of PV Installed Cost Trends Galen Barbose,in total average PV installed costs since 1998 appears to beNew York) exempted PV hardware costs from state sales tax

  1. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    of certain 21 materials for non-fuel cycle use, such as deuterium gas 22 for fiber-optic production, heavy water for deuterated *Added by DOENNSA for clarification. Capital...

  2. Essays in capital markets

    E-Print Network [OSTI]

    Makarov, Igor, 1976-

    2006-01-01

    This thesis consists of three essays in capital markets. The first essay presents a dynamic asset pricing model with heterogeneously informed agents. Unlike previous research, the general case where differential information ...

  3. Capital Reporting Company Quadrenntial ...

    Broader source: Energy.gov (indexed) [DOE]

    Quadrenntial Energy Review 04-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 NEW ENGLAND REGIONAL INFRASTRUCTURE CONSTRAINTS A Public Meeting on the Quadrennial...

  4. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    07-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 6 MONDAY, JULY 21, 2014 HELD AT: RASHID AUDITORIUM-HILLMAN CENTER...

  5. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 10: Infrastructure Constraints Monday, August 11, 2014 New Mexico State...

  6. Understanding Global Capitalism

    E-Print Network [OSTI]

    Robinson, William I.

    2008-01-01

    where-have-you, and they buy Lula panicked and said “well,on the basis it wasn’t that Lula and his faction of of thethat it could pressure Lula because transnational capital

  7. Capital Markets and the Pricing

    E-Print Network [OSTI]

    Schubart, Christoph

    Portfolios 10.7 Measuring Systematic Risk 10.8 Beta and the Cost of Capital #12;Copyright ©2014 Pearson Asset Pricing Model to calculate the cost of capital for a particular project. 12.Explain why in an efficient capital market the cost of capital depends on systematic risk rather than diversifiable risk. #12

  8. Installation Metered Rack Power

    E-Print Network [OSTI]

    van Hemmen, J. Leo

    . . . . . . . . . . . . . . . . . . . 1 Please recycle . . . . . . . . . . . . . . . . . . . . . . . . 1 Install the PDU interface on the PDU shows the aggregate current being used by the PDU and its attached devices. An alarm occurs if the aggregate current is above the high threshold value or below the low threshold value

  9. Average Angular Velocity

    E-Print Network [OSTI]

    H. Essen

    2004-01-28

    This paper addresses the problem of the separation of rotational and internal motion. It introduces the concept of average angular velocity as the moment of inertia weighted average of particle angular velocities. It extends and elucidates the concept of Jellinek and Li (1989) of separation of the energy of overall rotation in an arbitrary (non-linear) $N$-particle system. It generalizes the so called Koenig's theorem on the two parts of the kinetic energy (center of mass plus internal) to three parts: center of mass, rotational, plus the remaining internal energy relative to an optimally translating and rotating frame.

  10. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01

    level cost data provided by the California Solar Initiative,data for 2010 indicate that the average cost of systems installed through the California Solar

  11. CAPITAL PROJECT PROPOSAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L OBransenBusiness networkingFleetPuget Dr.HomeGas ReserveCAPITAL

  12. Access to Capital Roundtable

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment| DepartmentAL/FAL 99-01 More5, 2014Nonproliferation |is anCapital

  13. Human Capital Management Accountability Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-01

    The Order establishes requirements, roles and responsibilities for the Human Capital Management Accountability Program (HCMAP) for human resources programs and personnel and ensures that human capital activities are regulatory and procedurally compliant with Federal statutes and Departmental policies. Does not cancel other directives.

  14. Information, Diversification, and Cost of Capital

    E-Print Network [OSTI]

    Hughes, John S; Liu, Jing; Liu, Jun

    2005-01-01

    insider trading and cost of capital. ” Working paper, UCLA,Information and the cost of capital. ” Journal of Finance,in Determining Cost of Equity Capital,” Review of Accounting

  15. Magnet Girder Assembly and Installation

    ScienceCinema (OSTI)

    None

    2013-07-17

    It takes teamwork to assemble and install magnet girders for the storage ring of the National Synchrotron Light Source II. NSLS-II is now under construction at Brookhaven Lab.

  16. Solar Installation Labor Market Analysis

    SciTech Connect (OSTI)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  17. Net Zero Energy Installations (Presentation)

    SciTech Connect (OSTI)

    Booth, S.

    2012-05-01

    A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  18. Better Buildings Neighborhood Program Data Installed Measures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installed Measures Better Buildings Neighborhood Program Data Installed Measures Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September...

  19. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  20. The Draugen platform and subsea structures, installation and foundation aspects

    SciTech Connect (OSTI)

    Alm, T.; Bye, A.; Sandvik, K.; Egeland, S.

    1995-12-01

    Installation data from the Draugen GBS and subsea structures have been processed and analyzed in order to verify the design assumptions with regards to soil reactions. These results have shown that penetration of concrete skirts and piles into the very hard clay layer, typically found at the Haltenbanken area is feasible. The resistances may be predicted with reasonable accuracy using conventional methods and average soil strength values as obtained by traditional soil testing. This paper reveals and comments the installation data both for the gravity platform and the piles for the different subsea structures and provides and updated basis for foundation design of similar structures in the area.

  1. Capital Project 2 | P a g e

    E-Print Network [OSTI]

    Pittendrigh, Barry

    construction. Facility additions, renovations, and/or capital improvement projects estimated to cost $2 millionCapital Project Planning Process #12;2 | P a g e Capital Planning Overview The planning process overview presented in this document combines work being conducted by both Physical and Capital Planning

  2. Spacetime Averaged Null Energy Condition

    E-Print Network [OSTI]

    Douglas Urban; Ken D. Olum

    2010-06-13

    The averaged null energy condition has known violations for quantum fields in curved space, even if one considers only achronal geodesics. Many such examples involve rapid variation in the stress-energy tensor in the vicinity of the geodesic under consideration, giving rise to the possibility that averaging in additional dimensions would yield a principle universally obeyed by quantum fields. However, after discussing various procedures for additional averaging, including integrating over all dimensions of the manifold, we give a class of examples that violate any such averaged condition.

  3. Spacetime averaged null energy condition

    SciTech Connect (OSTI)

    Urban, Douglas; Olum, Ken D.

    2010-06-15

    The averaged null energy condition has known violations for quantum fields in curved space, even when one considers only achronal geodesics. Many such examples involve rapid variation in the stress-energy tensor in the vicinity of the geodesic under consideration, giving rise to the possibility that averaging in additional dimensions would yield a principle universally obeyed by quantum fields. However, after discussing various procedures for additional averaging, including integrating over all dimensions of the manifold, we give here a class of examples that violate any such averaged condition.

  4. UC Merced -Capital Planning and Space Management (updated August 2012) Capital Planning Process

    E-Print Network [OSTI]

    Oviedo, Néstor J.

    Improvement Projects based on project cost: #12;UC Merced - Capital Planning and Space Management (updated with an estimated cost greater than $750,000. These projects are included in the Capital Financial Plan Capital Improvements varies based on the project cost. · Minor Capital Improvements Minor Capital

  5. Averaging Hypotheses in Newtonian Cosmology

    E-Print Network [OSTI]

    T. Buchert

    1995-12-20

    Average properties of general inhomogeneous cosmological models are discussed in the Newtonian framework. It is shown under which circumstances the average flow reduces to a member of the standard Friedmann--Lema\\^\\i tre cosmologies. Possible choices of global boundary conditions of inhomogeneous cosmologies as well as consequences for the interpretation of cosmological parameters are put into perspective.

  6. Aasgard subsea installation on schedule

    SciTech Connect (OSTI)

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  7. Covenant Community Capital Mission: Covenant Community Capital equips working families to thrive financially

    E-Print Network [OSTI]

    Aazhang, Behnaam

    Covenant Community Capital Mission: Covenant Community Capital equips developments. Since its establishment, Covenant Community Capital has helped over 600. Research and develop a strategy for Covenant to acquire donated and low-cost

  8. Optimal Portfolio Management with Transactions Costs and Capital Gains Taxes

    E-Print Network [OSTI]

    Leland, Hayne E.

    1999-01-01

    with Transactions Costs and Capital Gains Taxes Hayne E.of Transactions Costs and Capital gains Taxes," SeptemberWITH TRANSACTIONS COSTS AND CAPITAL GAINS TAXES I.

  9. CMEA Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy Resources JumpEmissionCapitalCMEA Capital Jump to:

  10. Groundwater Monitoring Well Installation Work Plan

    E-Print Network [OSTI]

    Groundwater Monitoring Well Installation Work Plan CSMRI Site Prepared for: Colorado School;CSMRI Site Groundwater Monitoring Well Installation Work Plan December 6, 2006 Page ii Table of Contents

  11. TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS The displacement or deferral of substation...

  12. Automated solar collector installation design

    DOE Patents [OSTI]

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  13. Sandia Energy - Installation Energy Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)Geothermal Energy & DrillingNanomaterialsAssuranceInstallation

  14. Carpe Diem: Install Insulated Roman Shades

    Broader source: Energy.gov [DOE]

    As I mentioned in yesterday's blog, I had insulated window quilts installed on most of my home's windows.

  15. Quantum Averages of Weak Values

    E-Print Network [OSTI]

    Yakir Aharonov; Alonso Botero

    2005-08-23

    We re-examine the status of the weak value of a quantum mechanical observable as an objective physical concept, addressing its physical interpretation and general domain of applicability. We show that the weak value can be regarded as a \\emph{definite} mechanical effect on a measuring probe specifically designed to minimize the back-reaction on the measured system. We then present a new framework for general measurement conditions (where the back-reaction on the system may not be negligible) in which the measurement outcomes can still be interpreted as \\emph{quantum averages of weak values}. We show that in the classical limit, there is a direct correspondence between quantum averages of weak values and posterior expectation values of classical dynamical properties according to the classical inference framework.

  16. Greenview Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar Jump to: navigation,Capital Advisors GCAGreenview

  17. Implementation of Army privatization directives at Forscom installations

    SciTech Connect (OSTI)

    Armstrong, R.C.; Patwardhan, S.

    1997-06-01

    {open_quotes}Privatization{close_quotes} has become the buzzword of the 1990s not only here in the United States but throughout the world. Privatization has been traditionally defined as the sale/transfer of state-owned (i.e. federal, state, county, city or public) assets to the private sector. Although there are numerous reasons for the privatization of state-owned assets, the primary reasons include the generation of a significant amount of cash to the state (Great Britain`s sale of electric power industry); capitalization of the formerly state-owned utility (sale of the utilities within many countries of the former Soviet Union); and state policy goals of eliminating monopolies, encouraging competition, and restructuring (Chile). Several year ago, the Department of Defense (DoD) and specifically the Department of Army (DoA) initiated its own `Privatization Process`. Coupled with shrinking budgets, workforce and funding resources from the Government, the Army was faced with antiquated utility infrastructure in need of significant upgrades and in some cases total replacements. Recognizing that the provision of utility services was not a core mission of the Army, DoA has encouraged its Installations throughout the country to consider the privatization of the Government-owned utility systems. In compliance with DoA policy, Forces Command (FORSCOM) has been at the forefront of the privatization process. To date, FORSCOM has initiated the process of analyzing the potential privatization of over 30 utility systems at 12 FORSCOM Installations located throughout the country. The FORSCOM Installations include Fort Irwin, CA; Fort Campbell, KY; Fort Bragg, NC; Fort McPherson, GA; Fort Hood, TX; Fort Polk, LA; Fort Lewis, WA; Fort Riley, KS; Fort Stewart, GA; Hunter Army Airfield, GA; Fort Carson, CO; Fort Devens, MA; Fort Dix, NJ; and Fort Gillem, GA.

  18. Installing and Maintaining a Small Wind Electric System | Department...

    Office of Environmental Management (EM)

    Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System If you went...

  19. Departments of Energy, Defense Partner to Install Fuel Cell Backup...

    Energy Savers [EERE]

    Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup...

  20. Average-Atom Thomson Scattering

    E-Print Network [OSTI]

    Johnson, Walter R.

    -Atom Approximation W. R. Johnson, Notre Dame J. Nilsen & K. T. Cheng, LLNL The cross section for Thomson scattering Average-Atom Model Divide plasma into WS cells with a nucleus and Z electrons p2 2 - Z r + V a(r) = a a(r) V(r) = VKS(n(r), r) n(r) = nb(r) + nc(r) 4r2nb(r) = nl 2(2l+1) 1+exp[( nl -µ)/kBT] Pnl(r)2 Z = r

  1. The Nuclear Installations (Dangerous Occurrences) Regulations 1965 

    E-Print Network [OSTI]

    Lee, Fred; Ross, William

    1965-01-01

    STATUTORY INSTRUMENTS 1965 No. 1824 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) Regulations 1965...

  2. Sequential Linker Installation: Precise Placement of Functional...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sequential Linker Installation: Precise Placement of Functional Groups in Multivariate Metal-Organic Frameworks Previous Next List Yuan, Shuai; Lu, Weigang; Chen, Ying-Pin; Zhang,...

  3. Achronal averaged null energy condition

    SciTech Connect (OSTI)

    Graham, Noah; Olum, Ken D. [Department of Physics, Middlebury College, Middlebury, Vermont 05753 (United States) and Center for Theoretical Physics, Laboratory for Nuclear Science, and Department of Physics, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139 (United States); Institute of Cosmology, Department of Physics and Astronomy, Tufts University, Medford, Massachusetts 02155 (United States)

    2007-09-15

    The averaged null energy condition (ANEC) requires that the integral over a complete null geodesic of the stress-energy tensor projected onto the geodesic tangent vector is never negative. This condition is sufficient to prove many important theorems in general relativity, but it is violated by quantum fields in curved spacetime. However there is a weaker condition, which is free of known violations, requiring only that there is no self-consistent spacetime in semiclassical gravity in which ANEC is violated on a complete, achronal null geodesic. We indicate why such a condition might be expected to hold and show that it is sufficient to rule out closed timelike curves and wormholes connecting different asymptotically flat regions.

  4. Installing and Maintaining a Small Wind Electric System

    Broader source: Energy.gov [DOE]

    Installing a small wind electric system? Proper installation and maintenance are key to getting the most out of your system.

  5. Greenworld Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar Jump to:Resources Jump to:Greenworld Capital Jump to:

  6. Hazel Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy Resources Jump to: navigation, search Equivalent| Open EnergyCapital Jump to:

  7. Nite Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNew Hampshire: Energy ResourcesNiigataNiobraraNite Capital Jump to:

  8. Greentech Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to:ofEniaElectricHydro ElectricGreenLtd JumpCapital Jump to:

  9. Ardour Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex A S JumpArchuleta County, Colorado:Ardentown, Delaware:Capital

  10. Greener Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View New Pages RecentPlantMagmaIncentivesEnergyGreenVoltsGreener Capital

  11. Yellowstone Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (UtilityMichigan) Jump to: Name:XinjiangPupingYanyuanValley ElecCapital

  12. Earthrise Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePower VenturesInformation9)askDoubleEERE -ESolarEarthrise Capital Jump to:

  13. Osmosis Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart Grid DataInformationOpenOsmosis Capital Jump to:

  14. Photovoltaic Installations at Williams College Ruth Aronoff

    E-Print Network [OSTI]

    Aalberts, Daniel P.

    generation using solar power. Photovoltaic (PV) panel installations are a simple way for the College facilities, it is now evaluating in detail the environmental impact of these actions. In addition to making1 Photovoltaic Installations at Williams College Ruth Aronoff Williams Luce Project SUMMARY

  15. A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS

    E-Print Network [OSTI]

    Kozak, Victor R.

    A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

  16. Arduino Tool: For Interactive Artwork Installations

    E-Print Network [OSTI]

    Shaikh, Murtaza Hussain

    2012-01-01

    The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

  17. Housing market report Capital city market report

    E-Print Network [OSTI]

    Peters, Richard

    Housing market report Capital city market report Prepared February 2014 Dr Andrew Wilson, Senior mortgage interest rates, the current, once in a decade energy of the Sydney housing market is set house price growth since 2009 with the median house price increasing by 9.8 percent. All capital cities

  18. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect (OSTI)

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  19. Maryland-National Capital Building Industry Association Regulatory...

    Office of Environmental Management (EM)

    Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory...

  20. Best Practices for Controlling Capital Costs in Net Zero Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Best Practices for Controlling Capital Costs in Net Zero Energy Design and Construction - 2014 BTO Peer Review Best Practices for Controlling Capital Costs in Net Zero Energy...

  1. Accessing Low-Cost Capital Through Securitization (Poster)

    SciTech Connect (OSTI)

    Mendelsohn, M.

    2014-10-01

    Poster for Solar Power International conference presents information on NREL's effort to open capital markets through securitization via Solar Access to Public Capital (SAPC) working group's efforts.

  2. AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS

    E-Print Network [OSTI]

    Weidt, John

    2013-01-01

    Tables 2.0.2a 2.0.2b PAGE Air Leakage Through Sash/FrameOperation Types . . . . . Air Leakage of Installed WindowsComparison of Window Types Air Leakage Performance of

  3. Interactive Stereoscopic Installation: A Photographic Collage 

    E-Print Network [OSTI]

    Kannapurakkaran, Shyam

    2010-10-12

    The research involves the creation of an interactive installation showcasing the dynamic nature of human visual observation of a still photograph. Using an eye tracker as an input device, the data collected is used to create a photographic collage...

  4. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  5. North Shore Gas- Single Family Direct Install

    Broader source: Energy.gov [DOE]

    Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, Compact Fluorescent Bulbs (CFLs...

  6. Chapter 21. Installation and Testing the Hardware

    E-Print Network [OSTI]

    Brookhaven National Laboratory - Experiment 821

    .10.1.1.4 Extract the energy with the quench protection circuit ­ 1 day G. Bunce 1.10.1.1.5 Analyse the coil Meas. G. Danby 1.10.2.5 Install & Test Yoke Tilt Sensors G. Danby 1.10.2.6 Yoke Corrections I. Polk 1 Z. Armoza 1.10.2.13 Install & Test Pole­face windings S. Dhawan 1.10.2.14 Pole­face Winding

  7. Spectral averaging techniques for Jacobi matrices

    E-Print Network [OSTI]

    Rafael del Rio; Carmen Martinez; Hermann Schulz-Baldes

    2008-02-20

    Spectral averaging techniques for one-dimensional discrete Schroedinger operators are revisited and extended. In particular, simultaneous averaging over several parameters is discussed. Special focus is put on proving lower bounds on the density of the averaged spectral measures. These Wegner type estimates are used to analyze stability properties for the spectral types of Jacobi matrices under local perturbations.

  8. Installing and Maintaining a Small Wind Electric System | Department...

    Energy Savers [EERE]

    Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small...

  9. Performance Testing of Window Installation and Flashing Details 

    E-Print Network [OSTI]

    Weston, T. A.; Herrin, J.

    2002-01-01

    to determine water resistance, air leakage resistance and durability of several installation methods with different flashing materials. Windows were installed in test wall sections using several methods. The installations were monitored and evaluated for ease...

  10. 2011-2015 Human Capital Management Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This Human Capital Management Plan (HCMP or...

  11. Capitalize on Existing Assets with Demand Response 

    E-Print Network [OSTI]

    Collins, J.

    2008-01-01

    Industrial facilities universally struggle with escalating energy costs. EnerNOC will demonstrate how commercial, industrial, and institutional end-users can capitalize on their existing assets—at no cost and no risk. Demand response, the voluntary...

  12. Next Generation Connecticut & Other Capital Projects

    E-Print Network [OSTI]

    Alpay, S. Pamir

    Next Generation Connecticut & Other Capital Projects Planning, Architectural & Engineering Services September 18, 2014 #12;Agenda Project Updates · Next Generation Connecticut · Master Plan · Projects OF CONNECTICUT | CAMPUS MASTER PLAN SEPT. 12, 2014 7 #12;Master Planning Principles UNIVERSITY OF CONNECTICUT

  13. Development of a coiled tubing cable installation system

    SciTech Connect (OSTI)

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  14. University Services Preparing for Capital Renovations and Small Projects

    E-Print Network [OSTI]

    Shoubridge, Eric

    and a large capital project is the cost and the complexity. A small project must stay under 100 KUniversity Services ­ Preparing for Capital Renovations and Small Projects Anthony C. Masi Provost C. Masi, Provost) #12;3 1. Definitions a) Non-capital projects b) Capital project small and large 2

  15. Centre for Process Integration 2012 From Energy to Capital and

    E-Print Network [OSTI]

    Ahrendt, Wolfgang

    - Maintain product quality #12;1. Energy and Capital Cost Targets #12;Capital Energy Trade-Offs The correct setting for Tmin is economic. T H 2 Tmin2 T 1 H Tmin1 COST Total Capital OPT 1 2 Energy Tmin #12;We can set energy cost targets as a function of Tmin. Energy Cost Tmin #12;But what about capital cost

  16. Capital Assets...Start to Finish Business & Financial Services

    E-Print Network [OSTI]

    their inventory responsibilities #12;CAPITAL ASSETS · Capital Items ­ Equipment that has an acquisition cost of $5Capital Assets...Start to Finish Business & Financial Services Property Management Professional & Roles Acquisition Tracking Disposition #12;PROPERTY MANGEMENT OVERVIEW · Record and track capital assets

  17. Implementation of Carbon Reduction in Capital Projects Introduction

    E-Print Network [OSTI]

    Chittka, Lars

    performance consistent with achieving BREEAM Excellent. 2. Additionally all new capital projects shall comply

  18. U.S. CHP Installations Incorporating Thermal Energy Storage ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), September 2003 U.S. CHP Installations Incorporating Thermal Energy Storage (TES)...

  19. Database (Report) of U.S. CHP Installations Incorporating Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) andor Turbine Inlet Cooling (TIC), 2004 Database (Report) of U.S. CHP Installations Incorporating...

  20. Floodplain Assessment for Installation of a Renewable Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment for Installation of a Renewable Energy Anaerobic Digester Facility Floodplain Assessment...

  1. Secretary Chu Announces Two Million Smart Grid Meters Installed...

    Energy Savers [EERE]

    Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide Secretary Chu Announces Two Million Smart Grid Meters Installed Nationwide August 31, 2010 - 12:00am...

  2. Choosing and Installing Geothermal Heat Pumps | Department of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    most economical) are typically used for newly constructed buildings with sufficient land. Vertical installations or more compact horizontal "Slinky(tm)" installations are often...

  3. Solar Photovoltaic Installation Market Trends | OpenEI Community

    Open Energy Info (EERE)

    Solar Photovoltaic Installation Market Trends Home John55364's picture Submitted by John55364(95) Contributor 14 May, 2015 - 02:24 Global Solar Photovoltaic (PV) Installation...

  4. Energy Department Completes Cool Roof Installation on DC Headquarters...

    Energy Savers [EERE]

    Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters...

  5. Obama Administration Announces Plans to Install New Solar Panels...

    Energy Savers [EERE]

    Plans to Install New Solar Panels on the White House Residence Obama Administration Announces Plans to Install New Solar Panels on the White House Residence October 5, 2010 -...

  6. Characterization of the Installed Costs of Prime Movers Using...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007 Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September...

  7. Purchase and Installation of a Geothermal Power Plant to Generate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchase and Installation of a Geothermal Power Plant to Generate Electricity Using Geothermal Water Resources Purchase and Installation of a Geothermal Power Plant to Generate...

  8. U.S. Installation, Operation, and Performance Standards for Microturbi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000 U.S. Installation, Operation, and Performance Standards for Microturbine Generator...

  9. Tracking the Sun VIII: The Installed Price of Residential and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tracking the Sun VIII: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States Tracking the Sun VIII: The Installed Price of Residential...

  10. Factors Affecting PMU Installation Costs (October 2014) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Factors Affecting PMU Installation Costs (October 2014) Factors Affecting PMU Installation Costs (October 2014) The Department of Energy investigated the major cost factors that...

  11. Dynamic Multiscale Averaging (DMA) of Turbulent Flow

    SciTech Connect (OSTI)

    Richard W. Johnson

    2012-09-01

    A new approach called dynamic multiscale averaging (DMA) for computing the effects of turbulent flow is described. The new method encompasses multiple applications of temporal and spatial averaging, that is, multiscale operations. Initially, a direct numerical simulation (DNS) is performed for a relatively short time; it is envisioned that this short time should be long enough to capture several fluctuating time periods of the smallest scales. The flow field variables are subject to running time averaging during the DNS. After the relatively short time, the time-averaged variables are volume averaged onto a coarser grid. Both time and volume averaging of the describing equations generate correlations in the averaged equations. These correlations are computed from the flow field and added as source terms to the computation on the next coarser mesh. They represent coupling between the two adjacent scales. Since they are computed directly from first principles, there is no modeling involved. However, there is approximation involved in the coupling correlations as the flow field has been computed for only a relatively short time. After the time and spatial averaging operations are applied at a given stage, new computations are performed on the next coarser mesh using a larger time step. The process continues until the coarsest scale needed is reached. New correlations are created for each averaging procedure. The number of averaging operations needed is expected to be problem dependent. The new DMA approach is applied to a relatively low Reynolds number flow in a square duct segment. Time-averaged stream-wise velocity and vorticity contours from the DMA approach appear to be very similar to a full DNS for a similar flow reported in the literature. Expected symmetry for the final results is produced for the DMA method. The results obtained indicate that DMA holds significant potential in being able to accurately compute turbulent flow without modeling for practical engineering applications.

  12. Page 1 of 8 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    to aid in evaluating the overall performance of ground water extraction systems designed and installed of the subsurface performance of a ground water extraction system and the identification of the need for system of alternatives) 2) Typical Treatment Objectives There are two typical objectives for ground water extraction

  13. Page 1 of 6 Installation Name ____________________________________________________________

    E-Print Network [OSTI]

    US Army Corps of Engineers

    information Coordinate this checklist with the Ground Water Extraction System Subsurface Performance Well Design, Installation, and Documentation at HTRW Sites ETL 1110-1-201: Ground Water Extraction ASTM to aid in evaluating the performance and maintenance of extraction, injection, and monitoring wells

  14. flash informatique888 Automatiser votre installation

    E-Print Network [OSTI]

    Floreano, Dario

    ) Domaine Installation de systèmes d'exploitation Linux Licence GPLv2 langue anglais version Fedora Kickstartestuneméthoded'installationautomatiséepourlesdistri- butions GNU/Linux RedHat1 , et dérivées (Fedora, Cent-clés, ou options, est fournie de la part de RedHat5 et de Fedora3 . Cette section requiert des mots

  15. Transforming PV Installations Toward Dispatchable, Schedulable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B C N A B C N A B C N A B C N Ai n Bi n Ci n Aout Bout Cout A B C N A B C N Transforming PV insTallaTions Toward disPaTchable, schedulable energy soluTions MIChAEl MIllS-PrICE,...

  16. Installing Small Wind Turbines Seminar and Workshop

    E-Print Network [OSTI]

    Seminar and Workshop Installing Small Wind Turbines Seminar and Workshop Location: Murdoch January 2011 Details for Registration and Payment: Mr Daniel Jones, National Small Wind Turbine Test: The National Small Wind Turbine Centre at Murdoch University is holding a Small Wind Turbine short training

  17. MESOSCALE AVERAGING OF NUCLEATION AND GROWTH MODELS

    E-Print Network [OSTI]

    Ferguson, Thomas S.

    MESOSCALE AVERAGING OF NUCLEATION AND GROWTH MODELS MARTIN BURGER , VINCENZO CAPASSO , AND LIVIO-Kolmogorov relations for the degree of crystallinity. By relating the computation of expected values to mesoscale averaging, we obtain a suitable description of the process at the mesoscale. We show how the variance

  18. Optimal Average Cost Manufacturing Flow Controllers

    E-Print Network [OSTI]

    Veatch, Michael H.

    policy the differ- ential cost is C1 on attractive control switching boundaries. Index Terms Average costOptimal Average Cost Manufacturing Flow Controllers: Convexity and Differentiability Michael H and differentiability of the differential cost function are investigated. It is proven that under an optimal control

  19. Averages in vector spaces over finite fields 

    E-Print Network [OSTI]

    Wright J.; Carbery A.; Stones B.

    2008-01-01

    We study the analogues of the problems of averages and maximal averages over a surface in R-n when the euclidean structure is replaced by that of a vector space over a finite field, and obtain optimal results in a number ...

  20. Risktaking, Capital Markets, and Market Socialism

    E-Print Network [OSTI]

    Bardhan, Pranab

    1991-01-01

    takeovers and leveraged-buyout premiums average 50% abovetakeovers and leveraged-buyout premiums average 50% aboveforms (the leveraged buyout association is a major example)

  1. Measuring the Effects of Peaking, Vehicle Capital, and Passenger Capacity on the Cost of Providing Transit Service

    E-Print Network [OSTI]

    Taylor, Brian D; Garrett, Mark; Iseki, Hiroyuki

    1999-01-01

    include both operating costs and capital costs, though mostthe Peak Period Operating Vehicle Non-vehicle Costs CapitalCosts Capital Costs Total Capital Total Costs Costs This

  2. Valuing Rail Transit: Comparing Capital and Operating Costs to Consumer Benefits

    E-Print Network [OSTI]

    Guerra, Erick

    2010-01-01

    new starts projects-capital costs and ridership. Technicalridership, operating, and capital cost data for 24 transitridership, operating, and capital cost data for 24 transit

  3. STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION STAFF FORECAST: AVERAGE RETAIL ELECTRICITY PRICES 2005 TO 2018 Mignon Marks Principal Author Mignon Marks Project Manager David Ashuckian Manager ELECTRICITY ANALYSIS OFFICE Sylvia Bender Acting Deputy Director ELECTRICITY SUPPLY DIVISION B.B. Blevins Executive Director

  4. Distributed Averaging Via Lifted Markov Chains

    E-Print Network [OSTI]

    Jung, Kyomin

    Motivated by applications of distributed linear estimation, distributed control, and distributed optimization, we consider the question of designing linear iterative algorithms for computing the average of numbers in a ...

  5. Thermal ghost imaging with averaged speckle patterns

    E-Print Network [OSTI]

    Shapiro, Jeffrey H.

    We present theoretical and experimental results showing that a thermal ghost imaging system can produce images of high quality even when it uses detectors so slow that they respond only to intensity-averaged (that is, ...

  6. Selling Geothermal Systems The "Average" Contractor

    E-Print Network [OSTI]

    Selling Geothermal Systems #12;The "Average" Contractor · History of sales procedures · Manufacturer Driven Procedures · What makes geothermal technology any harder to sell? #12;"It's difficult to sell a geothermal system." · It should

  7. Spacetime Average Density (SAD) cosmological measures

    SciTech Connect (OSTI)

    Page, Don N.

    2014-11-01

    The measure problem of cosmology is how to obtain normalized probabilities of observations from the quantum state of the universe. This is particularly a problem when eternal inflation leads to a universe of unbounded size so that there are apparently infinitely many realizations or occurrences of observations of each of many different kinds or types, making the ratios ambiguous. There is also the danger of domination by Boltzmann Brains. Here two new Spacetime Average Density (SAD) measures are proposed, Maximal Average Density (MAD) and Biased Average Density (BAD), for getting a finite number of observation occurrences by using properties of the Spacetime Average Density (SAD) of observation occurrences to restrict to finite regions of spacetimes that have a preferred beginning or bounce hypersurface. These measures avoid Boltzmann brain domination and appear to give results consistent with other observations that are problematic for other widely used measures, such as the observation of a positive cosmological constant.

  8. MONOPOLY CAPITAL AND ITS INSULATION FROM COUNTERVAILING POWER: AMERICAN CAPITALISM REVISTED

    E-Print Network [OSTI]

    Iwamoto, Kichiro

    1979-01-01

    MONOPOLY CAPITAL AND ITS INSULATION FROM COUNTERVAILING POWER: AMERICAN CAPITALISM REVISTED Kichiro Iwamoto University ofSanta Clara David Willer University ofKansas Mid-American Review of Sociology, 1979, Vol IV, No. 2:1-15 THE IDEA... profits. Since A produces for such a large portion of the market, manufacturers B and C would not be expected to have either the capabilities or the capital to take the risk of increasing production in order to absorb portions of A~s market upon A's price...

  9. Average transmission probability of a random stack

    E-Print Network [OSTI]

    Yin Lu; Christian Miniatura; Berthold-Georg Englert

    2009-07-31

    The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

  10. Planning a Commercial Fuel Cell Installation 

    E-Print Network [OSTI]

    Bowden, J. R.; May, G. W.

    1986-01-01

    COMMERCIAL FUEL CELL INSTALLATION J. R.Bowden & G. W. May Bechtel National, Inc. San Francisco, California Fuel cell power plants represent a unique opportunity for industrial users to combine on-site electricity generation and heat recovery... with high efficiencies and no significant environmental releases. Thus in some circumstances, the fuel cell may be the best option for industrial cogeneration in locations with environmental restrictions. Because of the modular nature of fuel cell...

  11. Installation and Performance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIAL TECHNICAL8-02 Inspection Report:Department ofInstall

  12. Certificate in Capital Project Management Department of Civil Engineering

    E-Print Network [OSTI]

    Stuart, Steven J.

    1 Certificate in Capital Project Management Handbook Department of Civil Engineering Clemson capital projects. To address this need, the Clemson University Department of Civil Engineering offers efforts of team members from a wide variety of backgrounds: business, multiple engineering disciplines

  13. CAPITAL PROPERTY CHANGE FORM Control # (Asset Mgmt Use Only)

    E-Print Network [OSTI]

    : This form is required to account for the transfer of capital property items (cost of at least $5CAPITAL PROPERTY CHANGE FORM Control # (Asset Mgmt Use Only) Dept Contact: Phone #: Dept ID: Fund

  14. Tax policies, vintage capital, and exit and entry of plants 

    E-Print Network [OSTI]

    Chang, Shao-Jung

    2006-04-12

    Following Chamley, Lucas, Laitner, and Aiyagari, this dissertation continues to explore the answer for the question of zero capital taxation by discussing how taxes on capital income, labor income, and property affect the economy in the context of a...

  15. Essays on human capital and financial economics by Jialan Wang.

    E-Print Network [OSTI]

    Wang, Jialan, Ph.D. Massachusetts Institute of Technology

    2010-01-01

    This thesis consists of three essays examining issues related to human capital, careers, and financial economics. In the first chapter, I examine how the process of corporate bankruptcy varies by human capital intensity ...

  16. ACCOUNTING FOR CAPITAL Financial Policies and Procedures for the

    E-Print Network [OSTI]

    Alpay, S. Pamir

    ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO #12;Project Accounting Kimberley Rourke Manager, Project Accounting Correen Baker Fiscal Manager Lynn Chapdelaine Accountant Tammie Corioso Accountant #12;Financial Policies

  17. WORKING PAPER N 2009 -41 Migration and capital accumulation

    E-Print Network [OSTI]

    Boyer, Edmond

    , remittances, capital accumulation, rural poverty PARIS-JOURDAN SCIENCES ECONOMIQUES LABORATOIRE D. Key Words: Migration; Remittances; Capital Accumulation; Rural Poverty. Paris School of Economics (PSE) and Poverty Action Lab (J-PAL Europe), 48 Boulevard Jourdan, 75014 Paris, France. chiodi

  18. Capital Controls: Mud in the Wheels of Market Discipline

    E-Print Network [OSTI]

    Forbes, Kristin J.

    2004-03-12

    Widespread support for capital account liberalization in emerging markets has recently shifted to skepticism and even support for capital controls in certain circumstances. This sea-change in attitudes has been bolstered ...

  19. Architecture Office of Physical and Capital Planning

    E-Print Network [OSTI]

    Pittendrigh, Barry

    Architecture on Campus Office of Physical and Capital Planning February 2012 #12;2 HISTORY Architecture on the Purdue West Lafayette Campus has evolved and changed in many ways since the campus for campus buildings, establishing the consistency we see today. The architecture on the northern properties

  20. Corporate Venture Capital (CVC) Seeking Innovation and

    E-Print Network [OSTI]

    Corporate Venture Capital (CVC) Seeking Innovation and Strategic Growth Recent patterns in CVCRoberts, Professor of Management of Technology, Sloan School of Management, Massachusetts Institute of Technology ValLivada, Research Fellow, Sloan School of Management, Massachusetts Institute of Technology AndrewWang, Economist

  1. Housing market report Capital city market report

    E-Print Network [OSTI]

    Peters, Richard

    Housing market report Capital city market report Prepared January 2014 Dr Andrew Wilson, Senior economies. The national housing market will record positive growth again in 2014, although the level will impact other local housing markets, particularly in Sydney and Melbourne. Over 2013, the Australian

  2. CONSUMPTION ORIENTED FREE CAPITALISM Qiudong Wang

    E-Print Network [OSTI]

    Wang, Quidong

    CONSUMPTION ORIENTED FREE CAPITALISM Qiudong Wang The following pages are divided into two parts time-tested means of material production for subsistence. Life is a game of self-preservation in which, the first principle of individual human behavior is the principle of self-interest. Individuals, however

  3. CALIFORNIA INSTITUTE OF TECHNOLOGY CAPITAL CONSTRUCTION POLICY

    E-Print Network [OSTI]

    Goddard III, William A.

    CALIFORNIA INSTITUTE OF TECHNOLOGY CAPITAL CONSTRUCTION POLICY 12/3/03 Page 1 of 5 SUMMARY guidelines related to the funding and the estimating of costs. It also formalizes the review and approval construction project or major renovation with a project cost estimated to be $3 million or greater should

  4. Capitalization and Acronyms in Physics Celia M. Elliott

    E-Print Network [OSTI]

    Ha, Taekjip

    of Illinois #12;6 In these examples, "Einstein's," "Newton's," "Bose­Einstein," and "Auger" are capitalized

  5. A hedge fund business plan : investment theory, operations, and capital raising for Broadgates Capital Management

    E-Print Network [OSTI]

    Mills, Jeffrey David

    2014-01-01

    Launching a start-up hedge fund is a complex, multifaceted endeavor that requires an understanding of the interconnectivity between capital raising, investment strategy, regulation, and fund operations. The purpose of this ...

  6. The University of Northern British Columbia Five Year Capital Plan

    E-Print Network [OSTI]

    Northern British Columbia, University of

    and for the regional campuses; · To estimate the cost of the recommended capital projects and to identify preferred its scope to recommending new capital projects with an estimated cost exceeding $1M. Other yet-to- be-completed capital projects with a cost below $1M previously reported to government are listed in Appendix 2

  7. The Capital Asset Pricing Model: Theory and Evidence

    E-Print Network [OSTI]

    Thomas, Anne

    is still widely used in applications, such as estimating the cost of capital for firms and evaluatingThe Capital Asset Pricing Model: Theory and Evidence Eugene F. Fama and Kenneth R. French T he capital asset pricing model (CAPM) of William Sharpe (1964) and John Lintner (1965) marks the birth

  8. Social Capital in Virtual Organizations Saad Alqithami1

    E-Print Network [OSTI]

    Hexmoor, Henry

    capital investment has its risk and cost saving on drafting legal paperwork and overseeing the transactionSocial Capital in Virtual Organizations Saad Alqithami1 Department of Computer Science Southern that will give a clear analysis of how social capital can be created within virtual teams or organizations

  9. First installation of an electrical submersible pump in a subsea well

    SciTech Connect (OSTI)

    Mendonca, J.E.; Hodge, R.C.; Izetti, R.; Nicholson, A.; Dwiggins, J.L.; Morrison, D.; Cia, M.; Alfano, P.P.

    1995-12-31

    As offshore oil fields are being developed towards deeper and deeper waters, new technologies are required to curb capital expenditures. In Brazil, where oil consumption is increasing and huge oil fields lie in high water depths, the issue is particularly pressing. Earlier and higher oil production from those oil fields could be attained by the use of Electrical Submersible Pumps (ESP), so far restricted to dry completions. Also longer distances from well to platform would be made practical. For the initial phase of this development, Petrobras worked together with Tronic, Reda, Pirelli, Lasalle, Sade-Vigesa and Cooper. As a result, first-in-the-world ESP installation in a subsea well has been successfully achieved on October/1994 in RJS-221, located at Carapeba Field, Campos Basin, Brazil.

  10. Installing and Operating an Efficient Swimming Pool Pump | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installing and Operating an Efficient Swimming Pool Pump Installing and Operating an Efficient Swimming Pool Pump May 29, 2012 - 7:54pm Addthis Photo courtesy iStockphoto.com Photo...

  11. Reviewing Post-Installation and Annual Reports for Federal ESPC...

    Office of Environmental Management (EM)

    Reviewing Post-Installation and Annual Reports for Federal ESPC Projects Reviewing Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to...

  12. PNNL Reports Distributed Wind Installations Down, Exports Up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 PNNL Reports Distributed Wind Installations Down, Exports Up in 2013 March 31, 2014 - 11:14am Addthis According...

  13. Energy Saving "Cool Roofs" Installed at Y-12 | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Home Field Offices Welcome to the NNSA Production Office NPO News Releases Energy Saving "Cool Roofs" Installed at Y-12 Energy Saving "Cool Roofs" Installed at Y-12 The...

  14. Energy Department Launches SunShot Prize Competition to Install...

    Office of Environmental Management (EM)

    SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

  15. Polarized electron beams at milliampere average current

    SciTech Connect (OSTI)

    Poelker, Matthew

    2013-11-01

    This contribution describes some of the challenges associated with developing a polarized electron source capable of uninterrupted days-long operation at milliAmpere average beam current with polarization greater than 80%. Challenges will be presented in the context of assessing the required level of extrapolation beyond the performance of today's CEBAF polarized source operating at ~ 200 uA average current. Estimates of performance at higher current will be based on hours-long demonstrations at 1 and 4 mA. Particular attention will be paid to beam-related lifetime-limiting mechanisms, and strategies to construct a photogun that operate reliably at bias voltage > 350kV.

  16. Installed Geothermal Capacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View NewGuam:on Openei |sourceAndInformationInstalled Geothermal

  17. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  18. Table 1. Real Average Transportation and Delivered Costs of Coal...

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Average Transportation and Delivered Costs of Coal, By Year and Primary Transport Mode" "Year","Average Transportation Cost of Coal (Dollars per Ton)","Average Delivered Cost...

  19. A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION JUNE 2001 500-01-020 CONSULTANTREPORT Gray Davis, Governor #12;PV Installation Guide June 2001 Page 1 A GUIDE TO PHOTOVOLTAIC (PV) SYSTEM DESIGN AND INSTALLATION Prepared for: California Energy Commission Energy Technology

  20. Laser Fusion Energy The High Average Power

    E-Print Network [OSTI]

    Laser Fusion Energy and The High Average Power Program John Sethian Naval Research Laboratory Dec for Inertial Fusion Energy with lasers, direct drive targets and solid wall chambers Lasers DPPSL (LLNL) Kr posters Snead Payne #12;Laser(s) Goals 1. Develop technologies that can meet the fusion energy

  1. Extracting gluon condensate from the average plaquette

    E-Print Network [OSTI]

    Taekoon Lee

    2015-03-27

    The perturbative contribution in the average plaquette is subtracted using Borel summation and the remnant of the plaquette is shown to scale as a dim-4 condensate. A critical review is presented of the renormalon subtraction scheme that claimed a dim-2 condensate. The extracted gluon condensate is compared with the latest result employing high order (35-loop) calculation in the stochastic perturbation theory.

  2. Drum ring removal/installation tool

    DOE Patents [OSTI]

    Andrade, William Andrew (Livermore, CA)

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  3. Assembling and Installing LRUs for NIF

    SciTech Connect (OSTI)

    Bonanno, R E

    2003-12-31

    Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

  4. Installation of an innovative remedial technology

    SciTech Connect (OSTI)

    Hines, B. [CDM Federal Programs Corp., Kevil, KY (United States)

    1995-12-31

    The major goal of the Lasagna{trademark} project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE`s sites.

  5. The Capital Intensity of Photovoltaics Manufacturing

    SciTech Connect (OSTI)

    Basore, Paul

    2015-10-19

    Factory capital expenditure (capex) for photovoltaic (PV) module manufacturing strongly influences the per-unit cost of a c-Si module. This provides a significant opportunity to address the U.S. DOE SunShot module price target through capex innovation. Innovation options to reduce the capex of PV manufacturing include incremental and disruptive process innovation with c-Si, platform innovations, and financial approaches. and financial approaches.

  6. Case studies of six high priority DOD installations

    SciTech Connect (OSTI)

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  7. Average gluon and quark jet multiplicities

    E-Print Network [OSTI]

    A. V. Kotikov

    2014-11-30

    We show the results in [1,2] for computing the QCD contributions to the scale evolution of average gluon and quark jet multiplicities. The new results came due a recent progress in timelike small-x resummation obtained in the MSbar factorization scheme. They depend on two nonperturbative parameters with clear and simple physical interpretations. A global fit of these two quantities to all available experimental data sets demonstrates by its goodness how our results solve a longstandig problem of QCD. Including all the available theoretical input within our approach, alphas(Mz)=0.1199 +- 0.0026 has been obtained in the MSbar scheme in an approximation equivalent to next-to-next-to-leading order enhanced by the resummations of ln x terms through the NNLL level and of ln Q2 terms by the renormalization group. This result is in excellent agreement with the present world average.

  8. Design and installation of an ultra-deepwater subsea system: How to minimize risks and costs

    SciTech Connect (OSTI)

    Izetti, R.G.; Moreira, J.R.F.

    1995-04-01

    The world`s deepest subsea tree was successfully installed offshore Brazil at a water depth of 1,027 m, finally breaking the psychological barrier of 1,000 m. Actually, subsea completion technology has reached a point where the fundamental question no linger is whether fields located at water depths > 1,000 m can be profitably completed; is there a better and safer way to do it is now the key issue. Petrobras has pursued an aggressive strategy in R and D concept evaluations and various field studies aiming at a continuous decrease in both capital and operational expenditures. This paper describes the major subsea completion achievements resulting from this great effort, which include implementation of a standardization program; sharp reduction of subsea completion and drilling time; a new flowline connection method that combines the advantages of lay-away and pull-in methods; design and future installation of the world`s first subsea electrical submersible pump; and completion equipment simplification and resulting cost reduction. Also addressed are the key safety aspects related to deepwater completions and the equipment design improvement necessary to conduct those operations safely.

  9. Impact Ionization Model Using Average Energy and Average Square Energy of Distribution Function

    E-Print Network [OSTI]

    Dunham, Scott

    Impact Ionization Model Using Average Energy and Average Square Energy of Distribution Function Ken relaxation length, v sat ø h''i (¸ 0:05¯m), the energy distribution function is not well described calculation of impact ionization coefficient requires the use of a high energy distribution function because

  10. AMVER-SEAS Installation Guide 7/12/2010 Page 2/59 This installation guide provides instructions on how to install, and configure AMVER-

    E-Print Network [OSTI]

    on how to install, and configure AMVER- SEAS on computer for cruise. Note that you can find it under-SEAS Installation Guide 7/12/2010 Page 3/59 Table of contents Computer Hardware and Operating System Requirements............................................................................................................................ 4 Step1: Removing anti virus software

  11. Time-dependent angularly averaged inverse transport

    E-Print Network [OSTI]

    Guillaume Bal; Alexandre Jollivet

    2009-05-07

    This paper concerns the reconstruction of the absorption and scattering parameters in a time-dependent linear transport equation from knowledge of angularly averaged measurements performed at the boundary of a domain of interest. We show that the absorption coefficient and the spatial component of the scattering coefficient are uniquely determined by such measurements. We obtain stability results on the reconstruction of the absorption and scattering parameters with respect to the measured albedo operator. The stability results are obtained by a precise decomposition of the measurements into components with different singular behavior in the time domain.

  12. Reynolds-Averaged Navier-Stokes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serial codesReversingprovedReynolds-Averaged

  13. Hydropower Upgrades to Yield Added Generation at Average Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Related Articles Tacoma Power's Cushman Hydroelectric Project installed a new two-generator powerhouse that increases electric generation capacity by 3.6 megawatts and captures...

  14. The 2009 World Average of $?_s$

    E-Print Network [OSTI]

    Siegfried Bethke

    2009-08-15

    Measurements of $\\alpha_s$, the coupling strength of the Strong Interaction between quarks and gluons, are summarised and an updated value of the world average of $\\alpha_s (M_Z)$ is derived. Building up on previous reviews, special emphasis is laid on the most recent determinations of $\\alpha_s$. These are obtained from $\\tau$-decays, from global fits of electroweak precision data and from measurements of the proton structure function $\\F_2$, which are based on perturbative QCD calculations up to $O(\\alpha_s^4)$; from hadronic event shapes and jet production in $\\epem$ annihilation, based on $O(\\alpha_s^3) $ QCD; from jet production in deep inelastic scattering and from $\\Upsilon$ decays, based on $O(\\alpha_s^2) $ QCD; and from heavy quarkonia based on unquenched QCD lattice calculations. Applying pragmatic methods to deal with possibly underestimated errors and/or unknown correlations, the world average value of $\\alpha_s (M_Z)$ results in $\\alpha_s (M_Z) = 0.1184 \\pm 0.0007$. The measured values of $\\alpha_s (Q)$, covering energy scales from $Q \\equiv \\mtau = 1.78$ GeV to 209 GeV, exactly follow the energy dependence predicted by QCD and therefore significantly test the concept af Asymptotic Freedom.

  15. Sustainable World Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies Ltd Jump to:PowerSystemsWorld Capital

  16. Capital Equipment Validation Form | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReports from the CloudGEGR-NOperatorsCan'tPower | ArgonneCapital

  17. Working Capital for Contractors | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-Sessions |discussed how saving energy5 Worker Righs, Issue 2 Working Capital for

  18. Greentech Capital Advisors GCA | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar Jump to: navigation,Capital Advisors GCA Jump to:

  19. Long Branch Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona:Oregon: EnergyLloyd, NewBranch Capital Jump to: navigation, search

  20. Jane Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8,OpenKentucky: EnergyFacility |Jane Capital Partners Jump

  1. Eco Drive Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to:of the NationalDynetek EuropeEPG|ElecSolutions JumpCapital

  2. Black Coral Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar Energy LLC JumpBiossence Jump to: navigation, searchBirahi GangaCoral Capital

  3. Capital Electric Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar Energy LLC JumpBiossenceBrunswick,CalendarFork ElectricCapara EnergiaCapital

  4. Chestnut Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar Energy LLCLtd Jump to:Changing World TechnologiesChartsCapital LLC Jump to:

  5. Ambata Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar Energy LLC Jump to: navigation, search Name:Ambata Capital Partners Jump to:

  6. Sequoia Capital Ltda | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,EnergyEastCarbonOpenSchulthessENDA ProjectsCapital Ltda Jump

  7. Solution Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc JumpHeter BatterySolarfin Jump to:Solkar Solar Industry LtdSolution Capital

  8. Strategic Capital Investments LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc JumpHeter BatterySolarfinMarket Studies JumpSteinbineCycles IncCapital

  9. Sustainable Development Capital LLP | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEuropeEnergySustainability Center of the Rockies JumpCapital

  10. Ethanol Capital Funding | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto Electric Coop,Erosion Flume Jump to:Ethanol Capital Funding Jump

  11. Ethanol Capital Management | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto Electric Coop,Erosion Flume Jump to:Ethanol Capital Funding

  12. Hereford Capital Advisors | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View NewGuam: Energyarea, California |Sysop deletingHereford Capital

  13. MVP Capital Partners | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource HistoryScenarios Towards 2050Enermar <OMISPowerTurbine forMHKMP2MSEMVP Capital

  14. Mont Vista Capital LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to: navigation, searchsource History ViewMoe WindJump to:Vista Capital LLC

  15. Carbon Credit Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County,Camilla, Georgia: Energy ResourcesRanch Jump to:Capital Jump to:

  16. New Energy Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to: navigation,National MarineUSAIDCanaan, Connecticut:New EarthCapital

  17. Sibling Social Capital and College Success among Underrepresented Students

    E-Print Network [OSTI]

    Puquirre, Wendy V.

    2015-01-01

    Students and the Education System . . . . . . . . . . . 2.3Capital. ” Journal of Higher Education Cerna, Oscar. S. ,Journal of Hispanic Higher Education 8(2):130-157. Coleman,

  18. EMAB Briefing on Capital Assets Projects and Operations Activities...

    Office of Environmental Management (EM)

    has: * 2 Line item construction projects: Waste Treatment Plant (WTP) at Hanford and Salt Waste Processing Finishing Plant (SWPF) at Savannah River Site * Capital asset projects...

  19. Workplace Charging Challenge Partner: Capital One Financial Corporatio...

    Broader source: Energy.gov (indexed) [DOE]

    Corporation Capital One's Environmental Program seeks to reduce greenhouse gas (GHG) emissions throughout the organization's facilities and business practices. Since business...

  20. Manejando el Capital Riesgo y los Hedge Funds

    E-Print Network [OSTI]

    Torres Cordova, Hector Ramon

    2010-01-01

    que desarrollan esta estrategia orientan sus inversiones enNeutral de Capital. Estrategia que explota las ineficienciasMacro. Desarrolla su estrategia basados en las tendencias de

  1. NREL Activities to Open Capital Market Investment and Bank Lending...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Open Capital Market Investment and Bank Lending for Solar Deployment For NREL Finance Team Website Michael Mendelsohn and John Johsi U.S. Department of Energy Washington,...

  2. CFPL installs products pipeline with directional drilling

    SciTech Connect (OSTI)

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  3. Gasket and snap ring installation tool

    DOE Patents [OSTI]

    Southerland, Jr., James M. (Aiken, SC); Barringer, Jr., Curtis N. (Orangeburg, SC)

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  4. Microsoft Word - VitPlantCompletesMechanicalInstallation_20110818...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 18, 2011 Hanford Waste Treatment Plant completes important mechanical installation in Pretreatment Facility MEDIA CONTACTS: Suzanne Heaston, Bechtel National, Inc., (509)...

  5. Global Solar Photovoltaic (PV) Installation Market to be Propelled...

    Open Energy Info (EERE)

    Global Solar Photovoltaic (PV) Installation Market to be Propelled by Greater Concerns over Carbon Footprint Home > Groups > Renewable Energy RFPs John55364's picture Submitted by...

  6. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  7. DOE-DOD Emergency Backup Power Fuel Cell Installations

    Fuel Cell Technologies Publication and Product Library (EERE)

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  8. Focus Series: Maine - Residential Direct Install Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Better Buildings Neighborhood Program Focus Series: Maine - Residential Direct Install Program: Residential Air Sealing Program Drives Maine Home Energy Savings Through the Roof....

  9. Energy Secretary Chu Announces Five Million Smart Meters Installed...

    Broader source: Energy.gov (indexed) [DOE]

    TX) project involves deployment of a fully integrated advanced metering system and Web portal access to over 2.2 million customers and installation of advanced monitoring and...

  10. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Broader source: Energy.gov (indexed) [DOE]

    Lorain County Community College Instructors install PV modules on training roof labs during the Midwest Renewable Energy Associations Train-the-Trainer PV Instructor...

  11. The Nuclear Installations (Dangerous Occurrences )(Amendment) Regulations 1963 

    E-Print Network [OSTI]

    Wood, Richard; Noble, Michael

    1963-01-01

    STATUTORY INSTRUMENTS 1963 No. 1358 ATOMIC ENERGY AND RADIOACTIVE SUBSTANCES LICENSING AND REGULATION OF SITES The Nuclear Installations (Dangerous Occurrences) (Amendment) Regulations 1963...

  12. Consider Installing High-Pressure Boilers with BackpressureTurbine...

    Broader source: Energy.gov (indexed) [DOE]

    high-pressure boilers with backpressure turbine-generators as part of optimized steam systems. STEAM TIP SHEET 22 Consider Installing High-Pressure Boilers with Backpressure...

  13. Plug and Play: Purchase, Install, and Connect Residential Solar...

    Office of Environmental Management (EM)

    -- like permitting, installation, and interconnection -- make up more than half the total cost of solar energy system. To tackle these soft costs, Fraunhofer CSE developed its Plug...

  14. Fact #893: October 5, 2015 Incentives for the Installation of...

    Broader source: Energy.gov (indexed) [DOE]

    Incentives for the Installation of Electric Vehicle Charging Stations fotw893web.xlsx More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle...

  15. Net Zero Energy Military Installations: A Guide to Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for each installation is strongly site-specific, and may be identified using an optimization approach. Other nonrenewable load reduction projects (examples include co-...

  16. Combined Heat and Power (CHP) Installation Market to be Driven...

    Open Energy Info (EERE)

    overall combined heat and power installation market owing to widespread application in residential, commercial, and industrial segments. The growth of the Europe market can also...

  17. SMART Wind Consortium Virtual Meeting on Installation: Reducing...

    Broader source: Energy.gov (indexed) [DOE]

    to improve safety and efficiency and to reduce installation costs for distributed wind turbines. Gary Harcourt of Great Rock Windpower will discuss the electrician's work and...

  18. Installing and Maintaining a Home Solar Electric System | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Photo courtesy of Dennis Schroeder, NREL. Making sure your home solar electric or photovoltaic (PV) system is sized, sited, installed, and maintained correctly is essential...

  19. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 15, 2013 - 12:00am Addthis Lorain County Community College Instructors install PV modules on training roof labs during the Midwest Renewable Energy Associations...

  20. DOE-DOD Emergency Backup Power Fuel Cell Installations

    SciTech Connect (OSTI)

    Fuel Cell Technologies Program

    2012-06-01

    Ths fact sheet describes a collaboration between the departments of Energy and Defense to install and operate 18 fuel cell backup power systems across the United States.

  1. Install Removable Insulation on Valves and Fittings | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Insulate Steam Distribution and Condensate Return Lines Improving Steam System Performance: A Sourcebook for Industry, Second Edition Install an Automatic...

  2. Design, Installation, and Field Verification of Integrated Active...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design, Installation, and Field Verification of Integrated Active Desiccant Hybrid Rooftop Systems Combined with a Natural Gas Driven Cogeneration Package, 2008 Design,...

  3. Installing and Maintaining a Home Solar Electric System | Department...

    Energy Savers [EERE]

    Making sure your home solar electric or photovoltaic (PV) system is sized, sited, installed, and maintained correctly is essential for maximizing its energy performance. When...

  4. Install an Automatic Blowdown-Control System | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Install an Automatic Blowdown-Control System (January 2012) More Documents & Publications Minimize Boiler Blowdown Recover Heat from Boiler Blowdown CIBO Energy Efficiency Handbook...

  5. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01

    new starts projects-capital costs and ridership. TechnicalTransit Ridership and Capital Costs Erick Guerra and RobertTransit Ridership and Capital Costs Erick Guerra Robert

  6. Fact #744: September 10, 2012 Average New Light Vehicle Price...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: September 10, 2012 Average New Light Vehicle Price Grows Faster than Average Used Light Vehicle Price Fact 744: September 10, 2012 Average New Light Vehicle Price Grows Faster...

  7. Effects of installing economizers in boilers used in space heating applications

    SciTech Connect (OSTI)

    Gonzalez, M.A.; Medina, M.A.; Schruben, D.L.

    1999-07-01

    This paper discusses how the performance of a boiler can be improved by adding an economizer to preheat the boiler's feedwater. An energy analysis was applied to a boiler and then to both a boiler and an economizer (water pre-heater) to evaluate the benefits of heat recovery. Exergy rates calculated for both the boiler and the economizer determined that the temperature of the stack gases had primary effects on the performance of a boiler. The results from this study showed that 57% of the heat rejected at the boiler's stack could be recovered by installing an economizer to preheat the feedwater. As a result, the average cost savings that would be realized for a 36,400 kg/h (80,000 lbm/h) boiler averages US$8 per hour. The cost savings to steam production averaged US$0.20 per 455 kg (1,000 lbm) of steam and the ration between the cost savings to stack temperature averaged $0.02 per C (1.8 F). For this case, the fuel and the cost savings realized from using an economizer were averaged at 3.8% and 3.7%, respectively. These results translated to total cost savings, for an eight-day period considered, of US$940.

  8. Fact #849: December 1, 2014 Midsize Hybrid Cars Averaged 51%...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    cars are for gasoline cars only. Fuel economy average is the production-weighted harmonic mean. 2014 data are preliminary. Fact 849 Dataset Supporting Information Average...

  9. EXPENDITURE OBJECT CODES Capital Outlays CAPITAL OUTLAYS are expenditures that result in acquisitions of, additions to, replacement of, or major repairs

    E-Print Network [OSTI]

    Harms, Kyle E.

    and future fiscal periods. These objects are not to include cost of service contracts. 7100 Capital Outlays and other purchase-related costs. #12;EXPENDITURE OBJECT CODES ­ Capital Outlays 2-G page 2 7300EXPENDITURE OBJECT CODES ­ Capital Outlays 2-G page 1 CAPITAL OUTLAYS are expenditures that result

  10. Updated Capital Cost Estimates for Utility Scale Electricity

    E-Print Network [OSTI]

    that will serve future demand for electricity. These parameters also help to determine how new capacity competesUpdated Capital Cost Estimates for Utility Scale Electricity Generating Plants April 2013 Information Administration | Updated Capital Cost Estimates for Utility Scale Electricity Generating Plants ii

  11. Deliverable 3 Turbine Installation: Site Preparation and Footings

    E-Print Network [OSTI]

    Deliverable 3 Turbine Installation: Site Preparation and Footings Crissy Field Center Wind Power sufficient for industry standard analysis. Performance of the turbines on the site will be monitored programs. Deliverable 3 Turbine Installation: Site Preparation and Footings The Deliverables and Payment

  12. Targeting Net Zero Energy for Military Installations (Presentation)

    SciTech Connect (OSTI)

    Burman, K.

    2012-05-01

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  13. Installing the VTF/AMROC Software July 28, 2011

    E-Print Network [OSTI]

    Deiterding, Ralf

    Ubuntu, Fedora, and RedHat. It is assumed that the user has the privileges to install system software software installation tool for your distribution (requires the root password). Fedora, for instance, in the graphical Add/Remove Software tool, shows a section Programming. On my Fedora system, the following packages

  14. Information Technology Systems April, 2012 BIDS 2008 Installation Instructions

    E-Print Network [OSTI]

    Olszewski Jr., Edward A.

    Information Technology Systems April, 2012 BIDS 2008 Installation Instructions Operating System Go developer's site #12;Information Technology Systems April, 2012 Note: If you receive an error on SQL Server 2005 before BIDS 2008 will load. #12;Information Technology Systems April, 2012 BIDS 2008 install

  15. Study Guide for Photovoltaic System Installers and Sample Examination Questions

    Office of Energy Efficiency and Renewable Energy (EERE)

    This study guide presents some of the basic cognitive material that individuals who install and maintain PV systems should understand. This information is intended primarily as a study guide to help better prepare for the NABCEP PV installer examination but does not provide all of the information needed for completing the certification examination.

  16. Paint with Your Voice: An Interactive, Sonic Installation

    E-Print Network [OSTI]

    Paint with Your Voice: An Interactive, Sonic Installation Abstract In this paper, we describe the design and implementa- tion of an interactive, sonic installation that lets visitors paint pictures paintbrush that paints onto a projected canvas. Depending on both pitch and volume of the visitor's voice

  17. Fact #744: September 10, 2012 Average New Light Vehicle Price Grows Faster than Average Used Light Vehicle Price

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2011 the average used light vehicle price was 36% higher than in 1990, while the average new light vehicle price was 67% higher than it was in 1990. The average price of a used vehicle had been...

  18. On the relation between expected returns and implied cost of capital

    E-Print Network [OSTI]

    Hughes, John; Liu, Jing; Liu, Jun

    2009-01-01

    Toward an implied cost of capital. Journal of AccountingP. (2003). Inferring the cost of capital using the Ohlson–2003). Properties of implied cost of capital using analysts’

  19. Does Social Capital Lead to Support for Democracy in East Asia?

    E-Print Network [OSTI]

    Jou, Willy

    2007-01-01

    for democracy. Instead, what impact social capital exerts onfor examining the impact of social capital on democraticIn other words, does the impact of social capital depend on

  20. The Average Mass Profile of Galaxy Clusters

    E-Print Network [OSTI]

    R. G. Carlberg; H. K. C. Yee; E. Ellingson; S. L. Morris; R. Abraham; P. Gravel; C. J. Pritchet; T. Smecker-Hane; F. D. A. Hartwick; J. E. Hesser; J. B. Hutchings; J. B. Oke

    1997-05-23

    The average mass density profile measured in the CNOC cluster survey is well described with the analytic form rho(r)=A/[r(r+a_rho)^2], as advocated on the basis on n-body simulations by Navarro, Frenk & White. The predicted core radii are a_rho=0.20 (in units of the radius where the mean interior density is 200 times the critical density) for an Omega=0.2 open CDM model, or a_rho=0.26 for a flat Omega=0.2 model, with little dependence on other cosmological parameters for simulations normalized to the observed cluster abundance. The dynamically derived local mass-to-light ratio, which has little radial variation, converts the observed light profile to a mass profile. We find that the scale radius of the mass distribution, 0.20<= a_rho <= 0.30 (depending on modeling details, with a 95% confidence range of 0.12-0.50), is completely consistent with the predicted values. Moreover, the profiles and total masses of the clusters as individuals can be acceptably predicted from the cluster RMS line-of-sight velocity dispersion alone. This is strong support of the hierarchical clustering theory for the formation of galaxy clusters in a cool, collisionless, dark matter dominated universe.

  1. the average weight of Connecticut River fish was considerably less (Table 1). The difference in average

    E-Print Network [OSTI]

    the average weight of Connecticut River fish was considerably less (Table 1). The difference in the Connecticut River basin. Fisheries (Bethesda) 7(6): 2-11. POTTER. I. C.· F. W. H. BEAMISH, AND B. G. H. Freshwater fishes of Connecticut. State Geol. Nat. Hist. Servo Conn.· Dep. Environ. Prot., Bull. 101, 134 p

  2. Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java.

    E-Print Network [OSTI]

    Jiang, Huiqiang

    Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java. Please contact your technical support group for assistance. 1. Go to the following web site to download the Sun Java plug-in. http://www.java.com/en/download/manual.jsp 2. Click the link for your

  3. Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java.

    E-Print Network [OSTI]

    Sibille, Etienne

    Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java. Please contact your technical support group for assistance. 1. Go to the following web site to download the Sun Java plug-in. http://www.java.com/en/download/manual.jsp 2. Click the Windows 7, XP Online

  4. Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java.

    E-Print Network [OSTI]

    Sibille, Etienne

    Install Sun Java Plug-In for PRISM You will need administrator rights to your computer to install Java. Please contact your technical support group for assistance. 1. Go to the following web site to download the Sun Java plug-in. http://www.oracle.com/technetwork/java/javase/downloads/index.html 2. Next

  5. Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up AmaSeis

    E-Print Network [OSTI]

    Barrash, Warren

    Install, both Arduino and AmaSeis software programs: Installing Arduino and drivers: Setting up Ama the Arduino drivers. Take note of the assigned com port number, and set up AmaSeis to that number. 3. Some computers will require the following. Keep in mind, Arduino, does not need to run or be involved. You just

  6. Installation and Commissioning Automated Demand Response Systems

    SciTech Connect (OSTI)

    Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

    2008-04-21

    Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

  7. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  8. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  9. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  10. Quick Estimate of IRR From Capital Estimate Ratios 

    E-Print Network [OSTI]

    Larson, R. J.

    1985-01-01

    Value of a unit of capital = $821 / $1000 of capital Table III Net Present Value of a Unit of Revenue (or Savings; unit is $1000) TilDe year 0 1 2 3 4 5 6 Cash Flow (after $ 0 520 562 606 655 707 764 Taxes) Discounted Cash $ 0 452 425 399 375... proposes to invest $3500 to achieve SaVings of $1300 (b.t) in the first year of operation, economically attractive? Evaluations Criteria: Investment Equivalent of $1 of Savings $2.84. Solution: Maximum Capital allowed; $1300' $2.84 = $3 Since...

  11. Banner Job Installation Security Form Office of Information Technology

    E-Print Network [OSTI]

    Karsai, Istvan

    Banner Job Installation Security Form Office of Information Technology 424 Roy S. Nicks Hall, Box: ______________________________ Job Description: ______________________________ Section 3. Security Information Banner Module 70728 Johnson City, Tennessee 37614 (423) 439-4648 · oithelp@etsu.edu Section 1. Requestor Information

  12. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  13. Seeing solar on campus : a visible photovoltaic installation on campus

    E-Print Network [OSTI]

    Guarda, Daniel Jair Alves

    2006-01-01

    This paper presents a methodology for selecting a site on the MIT campus for a visible solar photovoltaic installation. Visibility, solar exposure, advertising potential, aesthetics, interactivity and direct or important ...

  14. ARRA Program Celebrates Milestone 600,000 Smart Meter Installations

    Broader source: Energy.gov [DOE]

    On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters.

  15. Install and Automatic Blowdown Control System - Steam Tip Sheet #23

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  16. Hindawi Publishing Corporation Science and Technology of Nuclear Installations

    E-Print Network [OSTI]

    Demazière, Christophe

    Hindawi Publishing Corporation Science and Technology of Nuclear Installations Volume 2013, Article Department of Nuclear Chemistry, Chalmers University of Technology, 412 96 Gothenburg, Sweden 2 Department of Nuclear Engineering, Chalmers University of Technology, 412 96 Gothenburg, Sweden Correspondence should

  17. Video Installation Design: Appropriation and Assemblage As Projection Surface Geometry 

    E-Print Network [OSTI]

    Weaver, Timothy A.

    2010-07-14

    This area of research focuses on the use of video projections in the context of fine art. Emphasis is placed on creating a unique video installation work that incorporates assemblage and appropriation as a means to develop multiple complex...

  18. Fact #893: October 5, 2015 Incentives for the Installation of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    common type of incentive is a state tax credit, but there are also states that give rebates, grants, tax exemptions, and loans to those installing EVSE. The incentives can apply...

  19. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Application for Permit to Install Utility Facilities Within Public ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMDOT...

  20. Army installations of the future : urban + shrinkage + landscape

    E-Print Network [OSTI]

    Howell, Dwight D. (Dwight Dee)

    2015-01-01

    The US Army has set a course to transition to a future force that is adaptive, modern, and at the forefront of change. This strategic vision lacks a refined installation strategy to meet the needs of the future force. In ...

  1. DoD Energy Innovation on Military Installations

    Energy Savers [EERE]

    Operational Energy Facility Energy 49% 32% 8% 7% 3% 1% 0% Electricity Natural Gas Fuel Oil Coal Steam LPG Other Test Bed Focus 4 Smart Secure Installation Energy Management *...

  2. Stress Testing Projected Capitalized Farmland Values 

    E-Print Network [OSTI]

    Gao, Bo 1988-

    2012-11-12

    values in each state as well as regional averages over the 2012-2015 period. These projections reflect alternative assumptions regarding future trends in real net farm income at the state level as well as the rate on 10-year constant maturity U...

  3. New concept for a general purpose subsea installation system

    SciTech Connect (OSTI)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehicle that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.

  4. SeaStar: Subsea cluster manifold system design and installation

    SciTech Connect (OSTI)

    Mason, P.G.T.; Upchurch, J.L.

    1996-12-31

    The SeaStar Cluster Manifold system was engineered as a low cost alternative to larger and more expensive completion template designs. Utilizing field-proven equipment and installation techniques, it was the first of its kind to be installed in the Gulf of Mexico. The Cluster Manifold system allows the connection of flowlines from adjacent satellite wells and numerous infield flowlines consisting of export, service, and methanol lines. With new technological advances, and a variety of flowline connection systems on the market today, deep water completions are being used with increasing frequency. Subsea operations are becoming more routine and installation times are being reduced. The SeaStar system was successfully installed in Garden Banks Block 70/71 in the Gulf of Mexico during the first quarter of 1995. Currently two 4 x 2-in. 10,000 psi lay-away trees are installed and connected to the manifold. Production is being processed at a Marathon platform in Vermilion Block 386B approximately 13.5 miles away from the subsea installation.

  5. UNITED STATES AIR FORCE OUTSIDE THE NATIONAL CAPITAL REGION

    E-Print Network [OSTI]

    program in order to reduce Federal employee's contribution to traffic congestion and air pollutionUNITED STATES AIR FORCE OUTSIDE THE NATIONAL CAPITAL REGION PUBLIC TRANSPORTATION BENEFIT PROGRAM): ____________ City (Residence): __________________________State: _______________ Zip Code: ________________ Air Force

  6. Fuel costs and the retirement of capital goods

    E-Print Network [OSTI]

    Goolsbee, Austan Dean

    1993-01-01

    This paper explores the effect that energy prices and market conditions have on the retirement rates of capital goods using new micro data on aircraft lifetimes and fuel costs. The oil shocks of the 1970s made fuel intensive ...

  7. Some Observations on Energy Efficiency and Capital Cost 

    E-Print Network [OSTI]

    Kenney, W. F.

    1982-01-01

    be required. This paper explores several cases where energy efficiency was improved with no increase in total plant capital (including the energy system). Cogeneration, driver selection and direct exchange are discussed. To explore the limitations...

  8. Mandatory Disclosure Quality, Inside Ownership, and Cost of Capital

    E-Print Network [OSTI]

    Core, John E.

    This paper examines whether and how inside ownership mediates the relation between disclosure quality and the cost of capital. Both ownership and more transparent reporting have the potential to align incentives between ...

  9. Process Integration: Designing for Energy, Capital and Operability 

    E-Print Network [OSTI]

    Linnhoff, B.

    1985-01-01

    Over the last five years, significant energy savings have been achieved by several international companies using the pinch concept for heat integration. New concepts are now being added to help the designer deal with capital cost minimization...

  10. Human capital, institutions, and incentives : micro and macro perspectives

    E-Print Network [OSTI]

    Gallego, Francisco A

    2006-01-01

    This dissertation consists of four essays on human capital, institutions, and incentives. In the first essay, I investigate the effects of voucher-school competition on educational outcomes in Chile. I present a theoretical ...

  11. Women in engineering conference: capitalizing on today`s challenges

    SciTech Connect (OSTI)

    Metz, S.S.; Martins, S.M.

    1996-06-01

    This document contains the conference proceedings of the Women in Engineering Conference: Capitalizing on Today`s Challenges, held June 1-4, 1996 in Denver, Colorado. Topics included engineering and science education, career paths, workplace issues, and affirmative action.

  12. Tenant-in-common capital in value added transactions

    E-Print Network [OSTI]

    Smith, Jared Steven

    2005-01-01

    Billions of dollars of equity is flowing into the emerging tenant-in-common (TIC) market, forcing demand for such investments to outweigh the current supply of TIC offerings. Investors seeking deferral of capital gains are ...

  13. Human Capital: The Role of Ombudsmen in Dispute Resolution

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Government Affairs, U.S. Senate United States General Accounting Office GAO April 2001 HUMAN CAPITAL The Role of Ombudsmen in Dispute Resolution GAO-01-466 Page i GAO-01-466...

  14. Lasting social impact : Community Development Venture Capital investing

    E-Print Network [OSTI]

    Silberberg, Hattie Paige

    2008-01-01

    Community Development Venture Capital Funds (CDVC) funds are an emerging group of Community Development Financial Institutions, that make equity investments in businesses in economically distressed areas. As equity investors, ...

  15. Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-03-28

    The purpose of this Manual is to provide requirements and guidance to Department of Energy (DOE) employees, including National Nuclear Security Administration (NNSA) employees on the planning and acquisition of capital assets. Does not cancel other directives.

  16. Essays on the real and financial allocation of capital

    E-Print Network [OSTI]

    Ramírez Verdugo, Arturo

    2006-01-01

    This dissertation consists of three papers studying how firms allocate real and financial capital, and how taxes, the labor market and asymmetric information affect these allocation decisions. The first paper studies the ...

  17. Time-Dependent Capital Budgeting with Multiple Criteria

    E-Print Network [OSTI]

    Klamroth, Kathrin

    of attention by economists, management scientists, industrial engineers, operations researchers et al. 8 . More recent papers proposed multiple criteria capital budgeting mod- els extended such as transportation planning, conservation biology, packaging and loading. The bi-criteria knapsack problem BCKP

  18. The Orthodox ethic and the spirit of anti-capitalism 

    E-Print Network [OSTI]

    Kartashov, Andrei Valerievich

    1998-01-01

    Since the publication of Weber's Protestant Ethic in 1906 it has become common place in sociology that capitalism and its institutions are inseparably bounded with individualist and rationalist work ethic as it is professed ...

  19. When Does Information Asymmetry Affect the Cost of Capital?

    E-Print Network [OSTI]

    Armstrong, Christopher S.

    This paper examines when information asymmetry among investors affects the cost of capital in excess of standard risk factors. When equity markets are perfectly competitive, information asymmetry has no separate effect on ...

  20. Fact #671: April 18, 2011 Average Truck Speeds | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 Average Truck Speeds The Federal Highway Administration studies traffic volume and flow on major truck routes by tracking more than 500,000 trucks. The average speed of trucks...

  1. Fact #889: September 7, 2015 Average Diesel Price Lower than...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: September 7, 2015 Average Diesel Price Lower than Gasoline for the First Time in Six Years Fact 889: September 7, 2015 Average Diesel Price Lower than Gasoline for the First...

  2. Fact #614: March 15, 2010 Average Age of Household Vehicles

    Broader source: Energy.gov [DOE]

    The average age of household vehicles has increased from 6.6 years in 1977 to 9.2 years in 2009. Pickup trucks have the oldest average age in every year listed. Sport utility vehicles (SUVs), first...

  3. Market Structure, Internal Capital Markets, and the Boundaries of the Firm

    E-Print Network [OSTI]

    Aazhang, Behnaam

    , but this flexibility comes at a cost: integrated firms cannot commit to particular capital allocations in advanceMarket Structure, Internal Capital Markets, and the Boundaries of the Firm Richmond D. Mathews an internal capital market. An internal capital market provides resource flexibility but does not allow

  4. Averaging top quark results in Run 2 M. Strovink

    E-Print Network [OSTI]

    Strovink, Mark

    average (cont'd) The pie chart shows the relative weights of the five input measurements in the world

  5. Improving climate change detection through optimal seasonal averaging: the

    E-Print Network [OSTI]

    Wirosoetisno, Djoko

    Improving climate change detection through optimal seasonal averaging: the case of the North. (2015) Improving climate change detection through optimal seasonal averaging: the case of the North;Improving climate change detection through optimal seasonal averaging:1 the case of the North Atlantic jet

  6. Engineering Grads Earn The Most Major Average Salary

    E-Print Network [OSTI]

    Shahabi, Cyrus

    Engineering Grads Earn The Most Table Major Average Salary Offer Petroleum Engineering $86/Aeronautical/Astronautical Engineering $57,231 Information Sciences & Systems $54,038 Source: Winter 2010 Salary Survey, National was the fourth most lucrative degree, with graduates starting at $61,205 on average. The average salary

  7. Education Spending: Impacts on Human Capital Development 

    E-Print Network [OSTI]

    Struminger, Rhonda

    2013-08-27

    and this leads to new occupations and economic growth for the larger community (OECD 2010a; Romer 1990, 1986). To boost all students to a skill level that will bolster the economy requires a commitment to students, 14 especially those who are least... inequality can actually impedes a country’s economic growth (Breen 1997). The impact education can have in a country when there is less inequality is significant. “Less egalitarian societies have lower average achievement, lower percentages of very highly...

  8. Renewable Energy Opportunities at the Kanto Installations, Japan

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

  9. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  10. HighCharts Non-commercial installation and activation help needed...

    Open Energy Info (EERE)

    Non-commercial installation and activation help needed Home > Groups > Databus Hi, I have installed Databus. After a fewdays the dashboard went blank with the message to...

  11. Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1

    E-Print Network [OSTI]

    Supersonic Air Jets Preserve Tree Roots in Underground Pipeline Installation1 Rob Gross 2 trenching operations for pipeline installation. Although mechanical soil excavation using heavy equipment

  12. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01

    sources of installed PV cost data for the U.S. 12 The report7 3. PV Installed Cost2005 through 2009. PV installed costs exhibit significant

  13. Potential for Photovoltaic Solar Installation in Non-Irrigated Corners of Center Pivot Irrigation Fields in the State of Colorado

    SciTech Connect (OSTI)

    Roberts, B.

    2011-07-01

    The State of Colorado expressed an interest in assessing the potential for photovoltaic (PV) solar installations on non-irrigated corners of center-pivot irrigation (CPI) fields throughout the state. Using aerial imagery and irrigated land data available from the Colorado Water Conservation Board, an assessment of potentially suitable sites was produced. Productivity estimates were calculated from that assessment. The total area of non-irrigated corners of CPI fields in Colorado was estimated to be 314,674 acres, which could yield 223,418 acres of installed PV panels assuming 71% coverage in triangular plots. The total potential annual electricity production for the state was estimated to be 56,821 gigawatt hours (GWH), with an average of 1.3 GWH per available plot.

  14. Solar heating system installed at Troy, Ohio. Final report

    SciTech Connect (OSTI)

    None

    1980-09-01

    This document is the Final Report of the Solar Energy System located at Troy-Miami County Public Library, Troy, Ohio. The completed system is composed of tree basic subsystems: the collector system consisting of 3264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which includes a 5000-gallon insulated steel tank; and the distribution and control system which includes piping, pumping and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and is, therefore, a retrofit system. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  15. Orbit-averaged guiding-center Fokker-Planck operator

    SciTech Connect (OSTI)

    Brizard, A. J. [Department of Chemistry and Physics, Saint Michael's College, Colchester, Vermont 05439 (United States); Decker, J.; Peysson, Y.; Duthoit, F.-X. [CEA, IRFM, Saint-Paul-lez-Durance F-13108 (France)

    2009-10-15

    A general orbit-averaged guiding-center Fokker-Planck operator suitable for the numerical analysis of transport processes in axisymmetric magnetized plasmas is presented. The orbit-averaged guiding-center operator describes transport processes in a three-dimensional guiding-center invariant space: the orbit-averaged magnetic-flux invariant {psi}, the minimum-B pitch-angle coordinate {xi}{sub 0}, and the momentum magnitude p.

  16. "Table 2. Real Average Annual Coal Transportation Costs, By Primary...

    U.S. Energy Information Administration (EIA) Indexed Site

    Real Average Annual Coal Transportation Costs, By Primary Transport Mode and Supply Region" "(2013 dollars per ton)" "Coal Supply Region",2008,2009,2010,2011,2012,2013 "Railroad"...

  17. LOW-HIGH VALUES FOR PETROLEUM AVERAGE INVENTORY RANGES (MILLION...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    ENERGY INFORMATION ADMINISTRATION LOW-HIGH VALUES FOR PETROLEUM AVERAGE INVENTORY RANGES (MILLION BARRELS) FILE UPDATED April 2004 Line Month Low High Number Product Name Geography...

  18. WARNING: Improper installation, adjustment, alteration, service or maintenance can

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    , cold water flows through the coils of the heat exchanger in the Aquastar. This same flow opens the gas valve, and the burners are ignited by the pilot flame. The heat exchanger coils absorb the heat INSTALLATION AND OPERATING INSTRUCTIONS FOR AUTOMATIC INSTANTANEOUS TYPE WATER HEATERS FOR USE WITH NATURAL

  19. Standardizing Appraisals for PV Installations Geoffrey T. Klise1

    E-Print Network [OSTI]

    Standardizing Appraisals for PV Installations Geoffrey T. Klise1 , Jamie L. Johnson2 , and Sandra K Gorda, FL, 33980, USA 3 Adomatis Appraisal Services, Punta Gorda, FL, 33951, USA ABSTRACT -- As PV to value the PV system as part of a property sale or re-finance. Proper valuation techniques as applied

  20. Sun N1 Grid Engine 6.1 Installation Guide

    E-Print Network [OSTI]

    Sun N1 Grid Engine 6.1 Installation Guide Sun Microsystems, Inc. 4150 Network Circle Santa Clara, CA 95054 U.S.A. Part No: 820­0697 May 2007 #12;Copyright 2007 Sun Microsystems, Inc. 4150 Network Circle, Santa Clara, CA 95054 U.S.A. All rights reserved. Sun Microsystems, Inc. has intellectual

  1. Sustainability Research & Development Consortium for DoD Installations

    E-Print Network [OSTI]

    bases. CEMML is already a proven global provider of re- search and sustainable management of natural-campus consortium that provides technical ex- pertise in support of broader sustainability initiatives at Department of Defense (DoD) installations. CSU is a leading test bed for our changing energy culture, as well

  2. T-729: Mozilla Code Installation Through Holding Down Enter

    Broader source: Energy.gov [DOE]

    Attackers can exploit this issue by enticing an unsuspecting victim into viewing and interacting with a malicious Web page. An attacker may be able to exploit this issue to bypass a confirmation dialog and install an arbitrary add-on. This may aid in further attacks.

  3. Vet’s company installing solar across Massachusetts

    Broader source: Energy.gov [DOE]

    Dan Leary, a U.S. Army veteran, is president of Nexamp Inc., a clean energy company that specializes in solar installation. Dan founded the company in 2006 and has witnessed its impressive growth from six employees to 65 and counting as of July 2010.

  4. THE IMPACT OF CITY-LEVEL PERMITTING PROCESSES ON RESIDENTIAL PV INSTALLATION PRICES AND DEVELOPMENT TIMES

    E-Print Network [OSTI]

    Dong, Changgui

    2014-01-01

    The installed price of photovoltaic (PV) systems hasprice and development time of residential photovoltaic (PV)

  5. EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

    Broader source: Energy.gov [DOE]

    Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development

  6. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    SciTech Connect (OSTI)

    Robinson, Sharon M; Jubin, Robert Thomas; Patton, Bradley D; Sullivan, Nicholas M; Bugbee, Kathy P

    2009-09-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  7. Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

    SciTech Connect (OSTI)

    Brooks, Kriston P.; Makhmalbaf, Atefe

    2014-10-31

    Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric efficiency, average net heat recovery efficiency, and overall net efficiency of the system increased respectively from 33% to 36%, from 38% to 41%, and from 71% to 76%. The temperature of water sent to sit however reduced by about 16% from 51?C to 43 ?C. This was a control strategy and the temperature can be controlled depending on building heat demands. More importantly, the number of shutdowns and maintenance events required to keep the systems running at the manufacturer’s rated performance specifications were substantially reduced by about 76% (for 8 to 10 units running over a one-year period). From July 2012 to June 2013, there were eight CE5 units in operation and a total of 134 scheduled and unscheduled shutdowns took place. From July 2013 to June 2014, between two to ten units were in operation and only 32 shutdowns were reported (all unscheduled). In summary, the number of shutdowns reduced from 10 shutdowns per month on average for eight CE5units to an average of 2.7 shutdowns per month for M5 units (between two to ten units).

  8. The global warming signal is the average of

    E-Print Network [OSTI]

    Jones, Peter JS

    The global warming signal is the average of years 70-80 in the increasing CO2 run minus the average represent significant uncertainty in the global warming signal (Fig. 5). The differences at high latitudes, uncertainty in the isopycnal diffusivity causes uncertainty of up to 50% in the global warming signal

  9. Morgantown Slightly Exceeds National Average for Cost of Living

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    (an index value of 100 reflects the national average). The index expresses the cost of living, health care, and miscellaneous goods and services. The index is designed to reflect the cost of living Relative to National Average by Category In Figure 2, we illustrate how the cost of living index has

  10. CO2e Capital Limited | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy Resources JumpEmissionCapitalCMEA CapitalTech

  11. Interaction model of private equity and venture capital developing factors in Chile and Latin America

    E-Print Network [OSTI]

    Sevil Esteban, Ángel

    2012-01-01

    Private equity and venture capital (PE/VC) are efficient resource allocation systems that provide equity capital to selected entrepreneurs, industries or firms that contribute to advance the economic welfare of society. ...

  12. A credit risk model for agricultural loan portfolios under the new Basel Capital Accord 

    E-Print Network [OSTI]

    Kim, Juno

    2005-08-29

    The New Basel Capital Accord (Basel II) provides added emphasis to the development of portfolio credit risk models. An important regulatory change in Basel II is the differentiated treatment in measuring capital requirements for the corporate...

  13. Program management systems for the semiconductor processing capital equipment supply chain

    E-Print Network [OSTI]

    Chandler, Thomas B. (Thomas Brian), 1970-

    2004-01-01

    The Capital Equipment Procurement group of Intel Corporation is responsible for developing and procuring the semiconductor processing capital equipment that is used throughout all of the company's development and manufacturing ...

  14. Venture Capital and private equity in India : systems analysis and development framework

    E-Print Network [OSTI]

    Surineni, Shravan Kumar

    2012-01-01

    Venture Capital (VC) has been an important driver of innovation, entrepreneurship and economic growth in the U.S. and around the world for the past few decades. The astounding success of Venture Capital prompted various ...

  15. Essays on Venture Capital Syndication and the Informational Efficiency of the Corporate Bond Market

    E-Print Network [OSTI]

    Moser, Shane

    2010-07-08

    The first two essays in this dissertation examine the phenomenon of venture capital syndication, or co-investment. In the first essay, I construct measures of syndicate heterogeneity and find that when venture capital firms ...

  16. Some Thoughts on Trends and Maturity Patterns in UK Venture Capital, 1985- 1993 

    E-Print Network [OSTI]

    Terry, N

    1994-01-01

    Venture capital is equity finance (the business risk-bearing class of capital) provided to unquoted businesses. Such investee firms can be started up, expanded, rescued, purchased as unquoted businesses, or become unquoted ...

  17. CAPITAL FOR ENERGY AND INTER-FUEL ELASTICITIES OF SUBSTITUTION

    E-Print Network [OSTI]

    CAPITAL FOR ENERGY AND INTER- FUEL ELASTICITIES OF SUBSTITUTION FROM A TECHNOLOGY SIMULATION MODEL: Christopher G.F. Bataille Energy Research Group School of Resource and Environmental Management Simon Fraser to make a cost comparison of potential greenhouse gas (GHG) abatement policies. Our primary tools

  18. Integrated models of capital adequacy Why banks are undercapitalised

    E-Print Network [OSTI]

    McNeil, Alexander J.

    applied to the design of financial regulation...the crisis which began in the US sub-prime mortgage market sheet of a representative Eurobank using an economic scenario generation model calibrated to conditions. The introduction of integrated economic-scenario-based models in future can improve capital adequacy, enhance

  19. Optics and Fluid Dynamics Department Intellectual Capital Accounts 1998

    E-Print Network [OSTI]

    Optics and Fluid Dynamics Department Intellectual Capital Accounts 1998 Resources, production and results RISØ-R-1108(EN) Risø National Laboratory Optics and Fluid Dynamics Department Building 128 P for optical information storage, · novel schemes for spatial cryptography, and · new models for surface

  20. DegreeinMasters CapitalProjectsSupplyChain

    E-Print Network [OSTI]

    Bolding, M. Chad

    and Logistics Application of model building and analytical techniques in the design, optimization, and control and optimizing the supply chain with specific applications in capital projects, a multidisciplinary approach has for improving supply chain processes today, and durable tools and concepts that will continue to serve

  1. USING THE SURVEY OF PLANT CAPACITY TO MEASURE CAPITAL UTILIZATION

    E-Print Network [OSTI]

    Cafarella, Michael J.

    The research program of the Center for Economic Studies (CES) produces a wide range of economic analyses, Discussion Papers, U.S. Census Bureau, Center for Economic Studies 2K130B, 4600 Silver Hill Road, Washington 168 hour week. The level and variability of capital utilization has important implications

  2. Cost of a Ride: The Effects of Densities on Fixed-Guideway Transit Ridership and Capital Costs

    E-Print Network [OSTI]

    Guerra, Erick; Cervero, Robert

    2010-01-01

    rail transit capital cost study update final. Washington,2005). Managing Capital Costs of Major Federally Fundedin US rail transit project cost overrun. Transportation

  3. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  4. Nitinol Heat Engine power plant system installation and cost optimization

    SciTech Connect (OSTI)

    Cady, E.C.; McNichols, J.L.

    1984-08-01

    Nitinol Heat Engines (NHE) use a shape memory alloy of nickel and titanium to directly convert the thermal energy in hot water to mechanical power (and, through a generator, to electricity). The authors designed a commercial version of a NHE based on the thermoturbine configuration developed in prototype form under contract to the Department of Energy in 1978-1980. The operation and cost of various forms of NHE have been described previously, but the penalties and costs associated with integrating the complete NHE system into installations supplying the thermal energy have not previously been determined. They found that these costs are most important, as they will often exceed the costs of the NHE proper. However, the total installed costs are quite low and result in very economical power from waste-heat or geothermal hot-water sources.

  5. Impact of Installation Faults on Heat Pump Performance

    SciTech Connect (OSTI)

    Hourahan, Mr. Glenn [Air Conditioning Contractors of America, Arlington, VA; Baxter, Van D [ORNL

    2015-01-01

    Numerous studies and surveys indicate that typically-installed HVAC equipment operate inefficiently and waste considerable energy due to varied installation errors (faults) such as improper refrigerant charge, incorrect airflow, oversized equipment, and leaky ducts. This article summarizes the results of a large United States (U.S.) experimental/analytical study (U.S. contribution to IEA HPP Annex 36) of the impact that different faults have on the performance of an air-source heat pump (ASHP) in a typical U.S. single-family house. It combines building effects, equipment effects, and climate effects in an evaluation of the faults impact on seasonal energy consumption through simulations of the house/ASHP pump system.

  6. Open PV Project: Unlocking PV Installation Data (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-04-01

    This brochure summarizes the Open PV Project, a collaborative effort of government, industry, and the public to compile a comprehensive database of PV installations in the United States. The brochure outlines the purpose and history of the project as well as the main capabilities and benefits of the online Open PV tool. The brochure also introduces how features of the tool are used, and it describes the sources and characteristics of Open PV's data and data collection processes.

  7. Solar heating system installed at Jackson, Tennessee. Final report

    SciTech Connect (OSTI)

    1980-10-01

    The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

  8. CSP'960H/CSP-960S Installation Guide

    E-Print Network [OSTI]

    Kleinfeld, David

    CSP'960H/CSP-960S Installation Guide 4-634-979-01 TM Read First! 1^00 - 3lG - 755; #12;CSP-960H/CSP CSP-960H only) J Sony CDU926S CD-R Drive Unit User's Guide Use this manual as a guide to help you. If all the items are not found, please contact your Sony dealer before proceeding. G CSP-960H/960S CD

  9. Install an Automatic Blowdown-Control System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIAL TECHNICAL8-02 Inspection Report:Department ofInstall an

  10. Summary: The First Installment of the Quadrennial Energy Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergyPlan | Department of EnergySummary: The First Installment of the

  11. Installing and Maintaining a Home Solar Electric System | Department of

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01 REPORT ON INSPECTIONEnergy Installing

  12. Does Corporate Social Responsibility Affect the Cost of Capital? * Sadok El Ghoul

    E-Print Network [OSTI]

    Saskatchewan, University of

    Does Corporate Social Responsibility Affect the Cost of Capital? * Sadok El Ghoul University the effect of corporate social responsibility (CSR) on the cost of equity capital for a large sample of U of Capital? Abstract We examine the effect of corporate social responsibility (CSR) on the cost of equity

  13. Fact #870: April 27, 2015 Corporate Average Fuel Economy Progress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress, 1978-2014 The Corporate Average Fuel Economy (CAFE) is the sales-weighted harmonic mean fuel economy of a manufacturer's fleet of new cars or light trucks in a certain...

  14. Fact #624: May 24, 2010 Corporate Average Fuel Economy Standards...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by the fleet of each manufacturer will be determined by computing the sales-weighted harmonic average of the targets applicable to each of the manufacturer's passenger cars and...

  15. On the Choice of Average Solar Zenith Angle

    E-Print Network [OSTI]

    Cronin, Timothy W.

    Idealized climate modeling studies often choose to neglect spatiotemporal variations in solar radiation, but doing so comes with an important decision about how to average solar radiation in space and time. Since both ...

  16. Does anyone have access to 2012 average residential rates by...

    Open Energy Info (EERE)

    Does anyone have access to 2012 average residential rates by utility company? I'm seeing an inconsistency between the OpenEI website and EIA 861 data set. Home > Groups > Utility...

  17. INDIVIDUAL REFORM ELEMENTS .63Average course exam score

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    INDIVIDUAL REFORM ELEMENTS .63Average course exam score .11In class clicker score .02Lecture: · Correlations with effort/curricular elements are positive but not high, indicating no individual course reform

  18. Fact #889: September 7, 2015 Average Diesel Price Lower than...

    Broader source: Energy.gov (indexed) [DOE]

    Average Diesel Price Lower than Gasoline for the First Time in Six Years fotw889web.xlsx More Documents & Publications Fact 859 February 9, 2015 Excess Supply is the Most Recent...

  19. Bounded Parameter Markov Decision Processes with Average Reward Criterion

    E-Print Network [OSTI]

    Tewari, Ambuj

    Bounded Parameter Markov Decision Processes with Average Reward Criterion Ambuj Tewari1 and Peter L, pp. 263­277, 2007. c Springer-Verlag Berlin Heidelberg 2007 #12;264 A. Tewari and P.L. Bartlett

  20. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  1. Design and installation manual for thermal energy storage

    SciTech Connect (OSTI)

    Cole, R L; Nield, K J; Rohde, R R; Wolosewicz, R M

    1980-01-01

    The purpose of this manual is to provide information on the design and installation of thermal energy storage in active solar systems. It is intended for contractors, installers, solar system designers, engineers, architects, and manufacturers who intend to enter the solar energy business. The reader should have general knowledge of how solar heating and cooling systems operate and knowledge of construction methods and building codes. Knowledge of solar analysis methods such as f-Chart, SOLCOST, DOE-1, or TRNSYS would be helpful. The information contained in the manual includes sizing storage, choosing a location for the storage device, and insulation requirements. Both air-based and liquid-based systems are covered with topics on designing rock beds, tank types, pump and fan selection, installation, costs, and operation and maintenance. Topics relevant to latent heat storage include properties of phase-change materials, sizing the storage unit, insulating the storage unit, available systems, and cost. Topics relevant to heating domestic water include safety, single- and dual-tank systems, domestic water heating with air- and liquid-based space heating systems, and stand alone domestics hot water systems. Several appendices present common problems with storage systems and their solutions, heat transfer fluid properties, economic insulation thickness, heat exchanger sizing, and sample specifications for heat exchangers, wooden rock bins, steel tanks, concrete tanks, and fiberglass-reinforced plastic tanks.

  2. Empirically Derived Strength of Residential Roof Structures for Solar Installations.

    SciTech Connect (OSTI)

    Dwyer, Stephen F.; Sanchez, Alfred; Campos, Ivan A.; Gerstle, Walter H.

    2014-12-01

    Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

  3. Averaged null energy condition violation in a conformally flat spacetime

    SciTech Connect (OSTI)

    Urban, Douglas; Olum, Ken D.

    2010-01-15

    We show that the averaged null energy condition can be violated by a conformally coupled scalar field in a conformally flat spacetime in 3+1 dimensions. The violation is dependent on the quantum state and can be made as large as desired. It does not arise from the presence of anomalies, although anomalous violations are also possible. Since all geodesics in conformally flat spacetimes are achronal, the achronal averaged null energy condition is likewise violated.

  4. Flavor Physics Data from the Heavy Flavor Averaging Group (HFAG)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Heavy Flavor Averaging Group (HFAG) was established at the May 2002 Flavor Physics and CP Violation Conference in Philadelphia, and continues the LEP Heavy Flavor Steering Group's tradition of providing regular updates to the world averages of heavy flavor quantities. Data are provided by six subgroups that each focus on a different set of heavy flavor measurements: B lifetimes and oscillation parameters, Semi-leptonic B decays, Rare B decays, Unitarity triangle parameters, B decays to charm final states, and Charm Physics.

  5. The Distorted Transformation of Mexico: Arbitralism and Developmentalism, and Political Capitalism and Subcapitalism. A Pathway towards Balancing Capitalism and Balanced Development, or Demdevelopment

    E-Print Network [OSTI]

    Nunez, Ramon

    2013-01-01

    from Antiquity to Feudalism (Verso Classics). Anguiano,international transition from feudalism to capitalism. Thiseconomies and societies from feudalism. Throughout the long

  6. Designing, selecting and installing a residential ground-source heat pump system

    SciTech Connect (OSTI)

    Hughes, Patrick [ORNL; Liu, Xiaobing [ORNL; Munk, Jeffrey D [ORNL

    2010-01-01

    It's a compelling proposition: Use the near-constant-temperature heat underground to heat and cool your home and heat domestic water, slashing your energy bills. Yet despite studies demonstrating significant energy savings from ground-source heat pump (GSHP) systems, their adoption has been hindered by high upfront costs. Fewer than 1% of US homes use a GSHP system. However, compared to a minimum-code-compliant conventional space-conditioning system, when properly designed and installed, a GSHP retrofit at current market prices offers simple payback of 4.3 years on national average, considering existing federal tax credits. Most people understand how air-source heat pumps work: they move heat from indoor air to outdoor air when cooling and from outdoor air to indoor air when heating. The ground-source heat pump operates on the same principle, except that it moves heat to or from the ground source instead of outdoor air. The ground source is usually a vertical or horiontal ground heat exchanger. Because the ground usually has a more favorable temperature than ambient air for the heating and cooling operation of the vapor-compression refrigeration cycle, GSHP sysems can operate with much higher energy efficiencies than air-source heat pump systems when properly designed and installed. A GSHP system used in a residual building typically provides space conditioning and hot water and comprises three major components: a water-source heat pump unit designed to operate at a wider range of entering fluid temperatures (typically from 30 F to 110 F, or 1 C to 43 C) than a conventional water-source heat pump unit; a ground heat exchanger (GHX); and distribution systems to deliver hot water to the storage tank and heating or cooling to the conditioned rooms. In most residual GSHP systems, the circulation pumps and associated valves are integrated with the heat pump to circulate the heat-carrier fluid (water or aqueous antifreeze solution) through the heat pump and the GHX. A recent assessment indicates that if 20% of US homes replaced their existing space-conditioning and water-heating systems with properly designed, installed and operated state-of-the-art GSHP systems, it would yield significant benefits each year. These include 0.8 quad British thermal units (Btu) of primary energy savings, 54.3 million metric tons of CO{sub 2} emission reductions, $10.4 billion in energy cost savings and 43.2 gigawatts of reduction in summer peak electrical demand.

  7. Vadose Zone Monitoring System Installation Report for McClellan AFB

    E-Print Network [OSTI]

    Zawislanski, Peter

    2010-01-01

    neutron probe and relative lithologie log Vadose Zone Monitoring SystemMonitoring System Installation Report for McClellan AFB NeutronMonitoring System Installation Report for McClellan AFB 4.3 Neutron

  8. New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01

    installed cost and the module price index in each year.Module Price Index Non-Module Cost (calculated) InstalledModule price index as a proxy for module costs. The non-

  9. New Berkeley Lab Report Tracks a Decade of PV Installed Cost Trends

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01

    Thus, even if large commercial PV installations continue tojoined by utility-scale PV), the removal of the cap on theLab Report Tracks a Decade of PV Installed Cost Trends Galen

  10. Fact #643: October 4, 2010 Four Cylinder Engine Installations Continue to Rise

    Broader source: Energy.gov [DOE]

    The share of 4 cylinder engines installed in light vehicles has been increasing since 2004. Beginning in 2006, cars have shown an increase in 4 cylinder engine installations while 8 cylinder engine...

  11. Replacing the Rare Earth Intellectual Capital

    SciTech Connect (OSTI)

    Gschneidner, Jr., Karl

    2011-04-01

    The rare earth crisis slowly evolved during a 10 to 15 year period beginning in the mid-1980s, when the Chinese began to export mixed rare earth concentrates. In the early 1990s, they started to move up the supply chain and began to export the individual rare earth oxides and metals. By the late 1990s the Chinese exported higher value products, such as magnets, phosphors, polishing compounds, catalysts; and in the 21st century they supplied finished products including electric motors, computers, batteries, liquid-crystal displays (LCDs), TVs and monitors, mobile phones, iPods and compact fluorescent lamp (CFL) light bulbs. As they moved to higher value products, the Chinese slowly drove the various industrial producers and commercial enterprises in the US, Europe and Japan out of business by manipulating the rare earth commodity prices. Because of this, the technically trained rare earth engineers and scientists who worked in areas from mining to separations, to processing to production, to manufacturing of semifinished and final products, were laid-off and moved to other fields or they retired. However, in the past year the Chinese have changed their philosophy of the 1970s and 1980s of forming a rare earth cartel to control the rare earth markets to one in which they will no longer supply the rest of the world (ROW) with their precious rare earths, but instead will use them internally to meet the growing demand as the Chinese standard of living increases. To this end, they have implemented and occasionally increased export restrictions and added an export tariff on many of the high demand rare earth elements. Now the ROW is quickly trying to start up rare earth mines, e.g. Molycorp Minerals in the US and Lynas Corp. in Australia, to cover this shortfall in the worldwide market, but it will take about five years for the supply to meet the demand, even as other mines in the ROW become productive. Unfortunately, today there is a serious lack of technically trained personnel to bring the entire rare earth industry, from mining to original equipment manufacturers (OEM), up to full speed in the next few years. Accompanying this decline in technical expertise, innovation and new products utilizing rare earth elements has slowed dramatically, and it may take a decade or more to recapture America's leading role in technological advancements of rare earth containing products. Before the disruption of the US rare earth industry, about 25,000 people were employed in all aspects of the industry from mining to OEM. Today, only about 1,500 people are employed in these fields. The ratio of non-technically trained persons to those with college degrees in the sciences or engineering varies from about 8 to 1 to about 4 to 1, depending on the particular area of the industry. Assuming an average of 6 to 1, the number of college degree scientists and engineers has decreased from about 4,000 to 250 employed today. In the magnetic industry the approximate numbers are: 6,000 total with 750 technically trained people in the 1980s to 500 totally employed today of which 75 have degrees. The paucity of scientists and engineers with experience and/or training in the various aspects of production and commercialization of the rare earths is a serious limitation to the ability of the US to satisfy its own needs for materials and technologies (1) to maintain our military strength and posture, (2) to assume leadership in critical energy technologies, and (3) to bring new consumer products to the marketplace. The lack of experts is of even greater national importance than the halting in the 1990s and the recent restart of the mining/benification/separation effort in the US; and thus governmental intervention and support for at least five to 10 years will be required to ameliorate this situation. To respond quickly, training programs should be established in conjunction with a national research center at an educational institution with a long tradition in multiple areas of rare earth and other critical elements research and technology. This center should

  12. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  13. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, Carol T. (Orinda, CA); Bender, Donald A. (Dublin, CA); Bowman, Barry R. (Livermore, CA); Burnham, Alan K. (Livermore, CA); Chesnut, Dwayne A. (Pleasanton, CA); Comfort, III, William J. (Livermore, CA); Guymon, Lloyd G. (Livermore, CA); Henning, Carl D. (Livermore, CA); Pedersen, Knud B. (Livermore, CA); Sefcik, Joseph A. (Tracy, CA); Smith, Joseph A. (Livermore, CA); Strauch, Mark S. (Livermore, CA)

    1993-01-01

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  14. Installing a Subsurface Drip Irrigation System for Row Crops 

    E-Print Network [OSTI]

    Enciso, Juan

    2004-09-07

    be used to trap the sand, followed by a disk or sand media fil- ter. When water comes from a canal, it is common to have both a media filter and a screen filter. Media filters need the most adjustment during installation. Media filters consist of several... system The main components of an irrigation system are the filters, mainlines, manifolds (submains), field blocks, flush lines, drip lines (laterals) and accessories (Fig. 1). All the drip lines (laterals) connected to the same submain make up a field...

  15. Oil/gas separator for installation at burning wells

    DOE Patents [OSTI]

    Alonso, C.T.; Bender, D.A.; Bowman, B.R.; Burnham, A.K.; Chesnut, D.A.; Comfort, W.J. III; Guymon, L.G.; Henning, C.D.; Pedersen, K.B.; Sefcik, J.A.; Smith, J.A.; Strauch, M.S.

    1993-03-09

    An oil/gas separator is disclosed that can be utilized to return the burning wells in Kuwait to production. Advantageously, a crane is used to install the separator at a safe distance from the well. The gas from the well is burned off at the site, and the oil is immediately pumped into Kuwait's oil gathering system. Diverters inside the separator prevent the oil jet coming out of the well from reaching the top vents where the gas is burned. The oil falls back down, and is pumped from an annular oil catcher at the bottom of the separator, or from the concrete cellar surrounding the well.

  16. Community Wind Handbook/Find an Installer | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal TechnologiesClioCommunity Wind Handbook/Find an Installer

  17. Spain Installed Wind Capacity Website | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEurope GmbHSoloPage Edit with form HistorySpain Installed Wind

  18. Install Removable Insulation on Valves and Fittings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide toIMPROVEMENT OFBarriers toDepartment13571installing removable

  19. High average power scaleable thin-disk laser

    DOE Patents [OSTI]

    Beach, Raymond J. (Livermore, CA); Honea, Eric C. (Sunol, CA); Bibeau, Camille (Dublin, CA); Payne, Stephen A. (Castro Valley, CA); Powell, Howard (Livermore, CA); Krupke, William F. (Pleasanton, CA); Sutton, Steven B. (Manteca, CA)

    2002-01-01

    Using a thin disk laser gain element with an undoped cap layer enables the scaling of lasers to extremely high average output power values. Ordinarily, the power scaling of such thin disk lasers is limited by the deleterious effects of amplified spontaneous emission. By using an undoped cap layer diffusion bonded to the thin disk, the onset of amplified spontaneous emission does not occur as readily as if no cap layer is used, and much larger transverse thin disks can be effectively used as laser gain elements. This invention can be used as a high average power laser for material processing applications as well as for weapon and air defense applications.

  20. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-28

    The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

  1. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-18

    To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

  2. RockPort Capital Partners (California) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onRAPID/Geothermal/Exploration/ColoradoRemsenburg-Speonk, NewMichigan: Energy Resources JumpMtSamplingRockPort Capital

  3. A Venture Capital Perspective on Technology Transfer and Alternative Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12 Beta-3 Racetracks25 AMOSystem for UtilizingVenture Capital

  4. U.S. Installation, Operation, and Performance Standards for Microturbine Generator Sets, August 2000

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report detailing the various codes and standards that are applicable for the installation, operation, and performance of microturbines.

  5. PIBASE.ligands installation guide. ver 200905 Fred P. Davis, HHMI-JFRC

    E-Print Network [OSTI]

    Eddy, Sean

    SQL interface, a software package is also available that enables a web interface to the database. The database Web interface To install the web interface to the PIBASE.ligands database, you must first have a working PIBASE web server installed. Once you have the PIBASE web interface installed, download the PIBASE

  6. THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION

    E-Print Network [OSTI]

    THE LOW-TEMPERATURE THRESHOLD FOR PINK SALMON EGGS IN RELATION TO A PROPOSED HYDROELECTRIC INSTALLATION JACK E. BAILEY' AND DALE R. EVANS' ABSTRACT A proposed hydroelectric installation in southeastern hydroelectric installation could result in temperatures as low as 4.5 0 C during spawning and initial incubation

  7. TOWARDS A MEANINGFUL STANDARD FOR PV ARRAY INSTALLATION IN AUSTRALIA. T. Spooner O. Arteaga M. Calais

    E-Print Network [OSTI]

    TOWARDS A MEANINGFUL STANDARD FOR PV ARRAY INSTALLATION IN AUSTRALIA. T. Spooner O. Arteaga M@eng.murdoch.edu.au ABSTRACT: Photovoltaic (PV) arrays have been installed for many years in a very wide range of applications of a standard for PV array installation. This paper discusses important safety issues with respect to the design

  8. Environmental impacts of large-scale grid-connected ground-mounted PV installations

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Environmental impacts of large-scale grid-connected ground-mounted PV installations Antoine Beylota-scale ground-mounted PV installations by considering a life-cycle approach. The methodology is based. Mobile PV installations with dual-axis trackers show the largest impact potential on ecosystem quality

  9. Solar Energy Development onSolar Energy Development on DoD Installations in the

    E-Print Network [OSTI]

    Solar Energy Development onSolar Energy Development on DoD Installations in the Mojave & Colorado/how solar can contribute to installation level energy· Assess whether/how solar can contribute to installation-level energy security · Recommend policy and programmatic modifications to accelerate solar

  10. Tracking the Sun V An Historical Summary of the Installed Price

    E-Print Network [OSTI]

    Tracking the Sun V An Historical Summary of the Installed Price of Photovoltaics in the United An Historical Summary of the Installed Price of Photovoltaics in the United States from 1998 to 2011 .......................................................................................................... 7 3. Installed Price Trends: Residential and Commercial PV

  11. The High Average Power Laser Program 15th HAPL meeting

    E-Print Network [OSTI]

    , 2006 #12;2 The HAPL team is developing the science, technology and architecture needed for a laser1 The High Average Power Laser Program 15th HAPL meeting Aug 8 & 9, 2006 General Atomics Scientific Inst 16. Optiswitch Technology 17. ESLI Electricity Generator Electricity Generator Reaction

  12. FOCI RESEARCH BENEFITS FISHERIES MANAGEMENT 1993 Recruitment Forecast -Average

    E-Print Network [OSTI]

    Marine Fisheries Service (NMFS) advises the North Pacific Fisheries Management Council using a "stock data but addresses the autocorrelation of recruitment. In addition, it directly predicts recruitment to average 1991 year class, and a strong 1992 year class. In 1993 the transfer function model predicted

  13. Parity-violating anomalies and the stationarity of stochastic averages

    SciTech Connect (OSTI)

    Reuter, M.

    1988-01-15

    Within the framework of stochastic quantization the parity-violating anomalies in odd space-time dimensions are derived from the asymptotic stationarity of the stochastic average of a certain fermion bilinear. Contrary to earlier attempts, this method yields the correct anomalies for both massive and massless fermions.

  14. Probabilistic Wind Vector Forecasting Using Ensembles and Bayesian Model Averaging

    E-Print Network [OSTI]

    Raftery, Adrian

    Probabilistic Wind Vector Forecasting Using Ensembles and Bayesian Model Averaging J. MCLEAN 2011, in final form 26 May 2012) ABSTRACT Probabilistic forecasts of wind vectors are becoming critical with univariate quantities, statistical approaches to wind vector forecasting must be based on bivariate

  15. Probabilistic Wind Speed Forecasting Using Ensembles and Bayesian Model Averaging

    E-Print Network [OSTI]

    Raftery, Adrian

    Probabilistic Wind Speed Forecasting Using Ensembles and Bayesian Model Averaging J. Mc in the context of wind power, where under- forecasting and overforecasting carry different financial penal- ties, calibrated and sharp probabilistic forecasts can help to make wind power a more financially competitive alter

  16. Fact #693: September 19, 2011 Average Vehicle Footprint for Cars...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    information below. Supporting Information Average Vehicle Footprint, 2008-2010 Model Year Car Light Truck All Light Vehicles 2008 45.4 53.0 49.0 2009 45.2 52.7 48.2 2010 45.2 54.0...

  17. Prediction in moving average processes Anton Schick and Wolfgang Wefelmeyer

    E-Print Network [OSTI]

    Wefelmeyer, Wolfgang

    Prediction in moving average processes Anton Schick and Wolfgang Wefelmeyer Abstract(y + (x1, . . . , xr)) dF(y) The research of A. Schick was partially supported by NSF Grant DMS0405791. 1 #12;2 ANTON SCHICK AND WOLFGANG WEFELMEYER can be estimated at the "parametric" root-n rate

  18. Optimal Control with Weighted Average Costs and Temporal Logic Specifications

    E-Print Network [OSTI]

    Murray, Richard M.

    Optimal Control with Weighted Average Costs and Temporal Logic Specifications Eric M. Wolff Control and Dynamical Systems California Institute of Technology Pasadena, California 91125 Email: ewolff@caltech.edu Ufuk Topcu Control and Dynamical Systems California Institute of Technology Pasadena, California 91125

  19. Instructions/Procedure for Transferring Capital Equipment Assets 1) Download the Capital Equipment Asset Transfer Form (UM 1556) from the UWide Forms Library. Please

    E-Print Network [OSTI]

    Minnesota, University of

    Instructions/Procedure for Transferring Capital Equipment Assets 1) Download the Capital Equipment that the original CF string on which the asset was purchased is incorrect. The cost of the asset will be transferred in the transfer. The cost of the asset will be transferred from the old CF string to the new CF string

  20. File under: C Web name Capital Renewal Fund Policy [February1, 1996] Capital Renewal Fund Policy [February1, 1996] Location: https://share.utorcsi.utoronto.ca/sites/gc/Governing%20Council/All%20Policies/C/capital%20renewal%20fund%20policy.docx

    E-Print Network [OSTI]

    Prodiæ, Aleksandar

    File under: C Web name Capital Renewal Fund Policy [February1, 1996] Capital Renewal Fund Policy/C/capital%20renewal%20fund%20policy.docx [Official update February1, 1996][Last unofficial update: January 9, 2015] University of Toronto Governing Council Capital Renewal Fund Policy February 1, 1996 To request

  1. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01

    comprehensive source of installed PV cost data for the U.S.compares recent PV installed costs in the U.S. to those inthrough 2008. PV installed costs exhibit significant

  2. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    E-Print Network [OSTI]

    Barbose, Galen L

    2010-01-01

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  3. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  4. Tracking the Sun: The Installed Cost of Photovoltaics in the U.S. from 1998-2007

    E-Print Network [OSTI]

    Wiser, Ryan

    2009-01-01

    The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-The Installed Cost of Photovoltaics in the U.S. from 1998-

  5. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01

    from 1998-2009 Tracking the Sun III: The Installed Cost ofSystems MW Total Tracking the Sun III: The Installed Cost ofthrough 2009. Tracking the Sun III: The Installed Cost of

  6. Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

    E-Print Network [OSTI]

    Barbose, Galen

    2011-01-01

    U.S. from 1998-2009 Tracking the Sun III: The Installed CostMW No. Systems MW Total Tracking the Sun III: The InstalledU.S. through 2009. Tracking the Sun III: The Installed Cost

  7. ELABORATION OF NOT LARGE MOBILE MODULAR INSTALLATION ''AQUA - EXPRESS'' (300 L/H) FOR LRW CLEANING

    SciTech Connect (OSTI)

    Karlin, Yurii; Dmitriev, Sergey; Iljin, Vadim; Ojovan, Mihail; Burcl, Rudolf

    2003-02-27

    Mobile modular installation ''Aqua-Express'' is a liquid low level and intermediate level radioactive waste (LL&ILRW) treatment facility, intended for not large research centers and other organizations, which activity causes the formation of a few quantity (up to 500 m3/year) of low and intermediate level radioactive waste water. Mobile modular installation ''Aqua-Express'' has the following features: (1) filtration, sorption and ultrafiltration units are used for LL&ILRW purification; (2) installation ''Aqua-Express'' consists of a cascade of three autonomous aqueous liquid waste-purifying installations; (3) installation ''Aqua-Express'' is a mobile installation; the installation can be transported by car, train, ship, or plane, as well as placed in a standard transport (sea or railway) container; (4) installation ''Aqua-Express'' does not includes any technological equipment for conditioning the secondary radioactive waste. Productivity of the installation ''Aqua-Express'' by purified water depends on composition of the initial liquid waste and makes up to 300 l/h. In present report is described the design of installation ''Aqua-Express'', theory of LRW purification in the installation ''Aqua-Express'' and some results of its use at cleaning real radioactive waters at State unitary enterprise - MosNPO ''Radon''.

  8. An Analysis of Air Passenger Average Trip Lengths and Fare Levels in US Domestic Markets

    E-Print Network [OSTI]

    Huang, Sheng-Chen Alex

    2000-01-01

    California at Berkeley An Analysis of Air Passenger AverageCalifornia at Berkeley An Analysis of Air Passenger Average

  9. Anomalous transport and observable average in the standard map

    E-Print Network [OSTI]

    Lydia Bouchara; Ouerdia Ourrad; Sandro Vaienti; Xavier Leoncini

    2015-09-02

    The distribution of finite time observable averages and transport in low dimensional Hamiltonian systems is studied. Finite time observable average distributions are computed, from which an exponent $\\alpha$ characteristic of how the maximum of the distributions scales with time is extracted. To link this exponent to transport properties, the characteristic exponent $\\mu(q)$ of the time evolution of the different moments of order $q$ related to transport are computed. As a testbed for our study the standard map is used. The stochasticity parameter $K$ is chosen so that either phase space is mixed with a chaotic sea and islands of stability or with only a chaotic sea. Our observations lead to a proposition of a law relating the slope in $q=0$ of the function $\\mu(q)$ with the exponent $\\alpha$.

  10. A New World Average Value for the Neutron Lifetime

    E-Print Network [OSTI]

    A. P. Serebrov; A. K. Fomin

    2010-05-27

    The analysis of the data on measurements of the neutron lifetime is presented. A new most accurate result of the measurement of neutron lifetime [Phys. Lett. B 605 (2005) 72] 878.5 +/- 0.8 s differs from the world average value [Phys. Lett. B 667 (2008) 1] 885.7 +/- 0.8 s by 6.5 standard deviations. In this connection the analysis and Monte Carlo simulation of experiments [Phys. Lett. B 483 (2000) 15] and [Phys. Rev. Lett. 63 (1989) 593] is carried out. Systematic errors of about -6 s are found in each of the experiments. The summary table for the neutron lifetime measurements after corrections and additions is given. A new world average value for the neutron lifetime 879.9 +/- 0.9 s is presented.

  11. Modeling an Application's Theoretical Minimum and Average Transactional Response Times

    SciTech Connect (OSTI)

    Paiz, Mary Rose

    2015-04-01

    The theoretical minimum transactional response time of an application serves as a ba- sis for the expected response time. The lower threshold for the minimum response time represents the minimum amount of time that the application should take to complete a transaction. Knowing the lower threshold is beneficial in detecting anomalies that are re- sults of unsuccessful transactions. On the converse, when an application's response time falls above an upper threshold, there is likely an anomaly in the application that is causing unusual performance issues in the transaction. This report explains how the non-stationary Generalized Extreme Value distribution is used to estimate the lower threshold of an ap- plication's daily minimum transactional response time. It also explains how the seasonal Autoregressive Integrated Moving Average time series model is used to estimate the upper threshold for an application's average transactional response time.

  12. Average Interpolating Wavelets on Point Clouds and Graphs

    E-Print Network [OSTI]

    Rustamov, Raif M

    2011-01-01

    We introduce a new wavelet transform suitable for analyzing functions on point clouds and graphs. Our construction is based on a generalization of the average interpolating refinement scheme of Donoho. The most important ingredient of the original scheme that needs to be altered is the choice of the interpolant. Here, we define the interpolant as the minimizer of a smoothness functional, namely a generalization of the Laplacian energy, subject to the averaging constraints. In the continuous setting, we derive a formula for the optimal solution in terms of the poly-harmonic Green's function. The form of this solution is used to motivate our construction in the setting of graphs and point clouds. We highlight the empirical convergence of our refinement scheme and the potential applications of the resulting wavelet transform through experiments on a number of data stets.

  13. Average dynamics of a finite set of coupled phase oscillators

    SciTech Connect (OSTI)

    Dima, Germán C. Mindlin, Gabriel B.

    2014-06-15

    We study the solutions of a dynamical system describing the average activity of an infinitely large set of driven coupled excitable units. We compared their topological organization with that reconstructed from the numerical integration of finite sets. In this way, we present a strategy to establish the pertinence of approximating the dynamics of finite sets of coupled nonlinear units by the dynamics of its infinitely large surrogate.

  14. Averaging cross section data so we can fit it

    SciTech Connect (OSTI)

    Brown, D.

    2014-10-23

    The 56Fe cross section we are interested in have a lot of fluctuations. We would like to fit the average of the cross section with cross sections calculated within EMPIRE. EMPIRE is a Hauser-Feshbach theory based nuclear reaction code, requires cross sections to be smoothed using a Lorentzian profile. The plan is to fit EMPIRE to these cross sections in the fast region (say above 500 keV).

  15. Monte Carlo Simulation Tool Installation and Operation Guide

    SciTech Connect (OSTI)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.; Kouzes, Richard T.; Orrell, John L.; Troy, Meredith D.; Wiseman, Clinton G.

    2013-09-02

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

  16. Assembly and Installation of the Daya Bay Antineutrino Detectors

    E-Print Network [OSTI]

    H. R. Band; R. L. Brown; R. Carr; X. C. Chen; X. H. Chen; J. J. Cherwinka; M. C. Chu; E. Draeger; D. A. Dwyer; W. R. Edwards; R. Gill; J. Goett; L. S. Greenler; W. Q. Gu; W. S. He; K. M. Heeger; Y. K. Heng; P. Hinrichs; T. H. Ho; M. Hoff; Y. B. Hsiung; Y. Jin; L. Kang; S. H. Kettell; M. Kramer; K. K. Kwan; M. W. Kwok; C. A. Lewis; G. S. Li; N. Li; S. F. Li; X. N. Li; C. J. Lin; B. R. Littlejohn; J. L. Liu; K. B. Luk; X. L. Luo; X. Y. Ma; M. C. McFarlane; R. D. McKeown; Y. Nakajima; J. P. Ochoa-Ricoux; A. Pagac; X. Qian; B. Seilhan; K. Shih; H. Steiner; X. Tang; H. Themann; K. V. Tsang; R. H. M. Tsang; S. Virostek; L. Wang; W. Wang; Z. M. Wang; D. M. Webber; Y. D. Wei; L. J. Wen; D. L. Wenman; J. Wilhelmi; M. Wingert; T. Wise; H. L. H. Wong; F. F. Wu; Q. Xiao; L. Yang; Z. J. Zhang; W. L. Zhong; H. L. Zhuang

    2013-09-06

    The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle theta13, and recently made the definitive discovery of its nonzero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of 300 - 2000m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors.

  17. Gas turbine nozzle vane insert and methods of installation

    DOE Patents [OSTI]

    Miller, William John (Simpsonville, SC); Predmore, Daniel Ross (Clifton Park, NY); Placko, James Michael (West Chester, OH)

    2002-01-01

    A pair of hollow elongated insert bodies are disposed in one or more of the nozzle vane cavities of a nozzle stage of a gas turbine. Each insert body has an outer wall portion with apertures for impingement-cooling of nozzle wall portions in registration with the outer wall portion. The insert bodies are installed into the cavity separately and spreaders flex the bodies toward and to engage standoffs against wall portions of the nozzle whereby the designed impingement gap between the outer wall portions of the insert bodies and the nozzle wall portions is achieved. The spreaders are secured to the inner wall portions of the insert bodies and the bodies are secured to one another and to the nozzle vane by welding or brazing.

  18. Solar space heating installed at Kansas City, Kansas. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-05-01

    The solar energy system was constructed with the new 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while the auxiliary energy system heats the office area of about 9800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors, manufactured by Solaron Corporation, are double glazed flat plate collectors with a gross area of 7800 ft/sup 2/. Air is heated either through the collectors or by the electric resistance duct coils. No freeze protection or storage is required for this system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  19. Averaged equilibrium and stability in low-aspect-ratio stellarators

    SciTech Connect (OSTI)

    Garcia, L.; Carreras, B.A.; Dominguez, N.

    1989-01-01

    The MHD equilibrium and stability calculations or stellarators are complex because of the intrinsic three-dimensional (3-D) character of these configurations. The stellarators expansion simplifies the equilibrium calculation by reducing it to a two-dimensional (2-D) problem. The classical stellarator expansion includes terms up to order epsilon/sup 2/, and the vacuum magnetic field is also included up to this order. For large-aspect-ratio configurations, the results of the stellarator expansion agree well with 3-D numerical equilibrium results. But for low-aspect-ratio configurations, these are significant discrepancies with 3-D equilibrium calculations. The main reason for these discrepancies is the approximation in the vacuum field contributions. This problem can be avoided by applying the average method in a vacuum flux coordinate system. In this way, the exact vacuum magnetic field contribution is included and the results agree well with 3-D equilibrium calculations even for low-aspect-ratio configurations. Using the average method in a vacuum flux coordinate system also permit the accurate calculation of local stability properties with the Mercier criterion. The main improvement is in the accurate calculation of the geodesic curvature term. In this paper, we discuss the application of the average method in flux coordinates to the calculation of the Mercier criterion for low-aspect-ratio stellarator configurations. 12 refs., 3 figs.

  20. Safety of Hydrogen Systems Installed in Outdoor Enclosures

    SciTech Connect (OSTI)

    Barilo, Nick F.

    2013-11-06

    The Hydrogen Safety Panel brings a broad cross-section of expertise from the industrial, government, and academic sectors to help advise the U.S. Department of Energy’s (DOE) Fuel Cell Technologies Office through its work in hydrogen safety, codes, and standards. The Panel’s initiatives in reviewing safety plans, conducting safety evaluations, identifying safety-related technical data gaps, and supporting safety knowledge tools and databases cover the gamut from research and development to demonstration and deployment. The Panel’s recent work has focused on the safe deployment of hydrogen and fuel cell systems in support of DOE efforts to accelerate fuel cell commercialization in early market applications: vehicle refueling, material handling equipment, backup power for warehouses and telecommunication sites, and portable power devices. This paper resulted from observations and considerations stemming from the Panel’s work on early market applications. This paper focuses on hydrogen system components that are installed in outdoor enclosures. These enclosures might alternatively be called “cabinets,” but for simplicity, they are all referred to as “enclosures” in this paper. These enclosures can provide a space where a flammable mixture of hydrogen and air might accumulate, creating the potential for a fire or explosion should an ignition occur. If the enclosure is large enough for a person to enter, and ventilation is inadequate, the hydrogen concentration could be high enough to asphyxiate a person who entered the space. Manufacturers, users, and government authorities rely on requirements described in codes to guide safe design and installation of such systems. Except for small enclosures used for hydrogen gas cylinders (gas cabinets), fuel cell power systems, and the enclosures that most people would describe as buildings, there are no hydrogen safety requirements for these enclosures, leaving gaps that must be addressed. This paper proposes that a technical basis be developed to enable code bodies to write requirements for the range of enclosures from the smallest to the largest.

  1. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  2. Design and development of a 6 MW peak, 24 kW average power S-band klystron

    SciTech Connect (OSTI)

    Joshi, L.M.; Meena, Rakesh; Nangru, Subhash; Kant, Deepender; Pal, Debashis; Lamba, O.S.; Jindal, Vishnu; Jangid, Sushil Kumar, E-mail: joslm@rediffmail.com [Central Electronics Engineering Research Institute, Council of Scientific and Industrial Research, Pilani (India); Chakravarthy, D.P.; Dixit, Kavita [Bhabha Atomic Research Centre, Mumbai (India)

    2011-07-01

    A 6 MW peak, 24 kW average power S-band Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance valuation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron. (author)

  3. TianDi Growth Capital | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)Open Energy Information ThreeTianDi Growth Capital Jump to:

  4. Venture Capital Fund Performance and the IPO Market

    E-Print Network [OSTI]

    McKenzie, Michael; Janeway, William

    2008-01-01

    of large buyout funds and a much smaller cross-section of venture funds” (p. 17). Specifically, only a quarter of the funds in the investment portfolio of the limited partner are venture funds. By way of comparison, 75% of all private equity funds... in the VE database are venture focussed. Similarly, 15% of the limited partners capital was invested in venture funds, compared to 41.5% for all funds in the VE database. Thus, the bias of this sample toward buy-out funds limits the extent to which...

  5. Sustainable Energy Capital Partners SECP | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model for theSunLanSuperDriveEconomiesNewSustainCapital

  6. Capital Projects Estimated >$7 Million in Direct Costs Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReports from the CloudGEGR-NOperatorsCan'tPowerCapital Projects

  7. EA-185 Morgan Stanley Capital Group Inc. | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electricLaboratoryofNotices |DynegyPowerexMorgan Stanley Capital Group

  8. EM Capital Asset Project List | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPL EnergyPlus, LLC to5USC787StatementDepartment'sRead the EM Capital Asset

  9. Mexico-Capital Markets Climate Initiative | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to: navigation,Mereg GmbH Jump to: navigation,EnergyCapital Markets

  10. PvT Capital Gmbh | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,Energy LLCALLETE Inc dEAPrysmianPvT Capital Gmbh Jump to:

  11. Carbon Credit Capital and Feedback Ventures JV | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,Cammack Village, Arkansas: EnergyCounty,NewHatteras2ConnectionsUtah:Capital

  12. Guide to IT Capital Planning and Investment Control

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nA Guide to Tapping STD-1128-2013levelGUIDE TO FEDERAL REGULATION OFIT Capital

  13. MP2 CapitalLLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource HistoryScenarios Towards 2050Enermar <OMISPowerTurbine forMHKMP2 CapitalLLC

  14. BioLogical Capital BLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin: EnergyYorkColoradoBelcherCarbonAlgeneBioLogical Capital BLC Jump

  15. CE2 Capital Partners LLC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy Resources JumpEmissionCapital Partners LLC Jump

  16. Office of the Chief Human Capital Officer | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of rare Kaonforsupernovae model (JournalHearingsHuman Capital Officer Search

  17. Appalachia's new region-wide CDFI : building local community with global capital?

    E-Print Network [OSTI]

    Spicer, Jason S. (Jason Simpson)

    2014-01-01

    The Appalachian Regional Commission is currently working with a major foundation on the development of a new regional Community Development Financial Institution (CDFI), Appalachian Community Capital. By connecting ...

  18. Exogenous Productivity Shocks and Capital Investment in Common-pool Resources

    E-Print Network [OSTI]

    Fissel, Benjamin E; Glibert, Ben

    2010-01-01

    Capital Investment in Common-pool Resources ? Benjamin E.technology shocks in common-pool industries using a compoundhallmarks of congestible, common-pool re- sources. Symmetric

  19. Investment performance of life-science venture capital investment funds, persistence, and subsector analysis

    E-Print Network [OSTI]

    Behrens, Jeffrey S

    2007-01-01

    Venture capital investment performance data and performance attribution are not typically published. Venture investors articulate (and sell to LPs) conflicting strategies; the popular business literature and culture is ...

  20. Social Capital, ICT Use and Company Performance: Findings from the Medicon Valley Biotech Cluster

    E-Print Network [OSTI]

    Steinfield, Charles

    Social Capital, ICT Use and Company Performance: Findings from the Medicon Valley Biotech Cluster Valley biotech region located in Denmark and Southern Sweden. Responding companies included established

  1. U.S. Department of Energy Selects Venture Capital Firms to Accelerate...

    Office of Environmental Management (EM)

    entrepreneurs in residence and their venture capital sponsors would negotiate a license to use the laboratory-developed technology. Working with their respective...

  2. OFFICE of MATERIALS & LOGISTICS MANAGEMENT CAPITAL ASSET INVENTORY CERTIFICATE --IC-10

    E-Print Network [OSTI]

    Oliver, Douglas L.

    OFFICE of MATERIALS & LOGISTICS MANAGEMENT CAPITAL ASSET INVENTORY CERTIFICATE -- IC-10 DATE: From: Jack Ferraro University Director Office of Materials & Logistics Management (MLM) LB058, MC 2012

  3. Native American Housing Stakeholder Meeting- Tribal Data: Building the Bridge to New Capital

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hosted by the Housing Assistance Council, the Native American Housing Stakeholder Meeting will discuss effective strategies for tribally led data collection, ways to access and leverage new capital...

  4. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01

    information on wind power purchase prices, capital costs,prices and/or negotiated power purchase agreements as muchLab collection of power purchase agreements. To reduce the

  5. Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-09-01

    The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue. To solve gearbox reliability issues, NREL launched a Gearbox Reliability Collaborative (GRC) in 2006 and brought together the world's leading turbine manufacturers, consultants, and experts from more than 30 companies and organizations. GRC's goal was to validate the typical design process-from wind turbine system loads to bearing ratings-through a comprehensive dynamometer and field-test program. Design analyses will form a basis for improving reliability of future designs and retrofit packages. Through its study of Alstom's Eco 100 gearbox, NREL can compare its GRC model gearbox with Alstom's and add the results to the GRC database, which is helping to advance more reliable wind turbine technology.

  6. (Approximate) Low-Mode Averaging with a new Multigrid Eigensolver

    E-Print Network [OSTI]

    Gunnar Bali; Sara Collins; Andreas Frommer; Karsten Kahl; Issaku Kanamori; Benjamin Müller; Matthias Rottmann; Jakob Simeth

    2015-09-23

    We present a multigrid based eigensolver for computing low-modes of the Hermitian Wilson Dirac operator. For the non-Hermitian case multigrid methods have already replaced conventional Krylov subspace solvers in many lattice QCD computations. Since the $\\gamma_5$-preserving aggregation based interpolation used in our multigrid method is valid for both, the Hermitian and the non-Hermitian case, inversions of very ill-conditioned shifted systems with the Hermitian operator become feasible. This enables the use of multigrid within shift-and-invert type eigensolvers. We show numerical results from our MPI-C implementation of a Rayleigh quotient iteration with multigrid. For state-of-the-art lattice sizes and moderate numbers of desired low-modes we achieve speed-ups of an order of magnitude and more over PARPACK. We show results and develop strategies how to make use of our eigensolver for calculating disconnected contributions to hadronic quantities that are noisy and still computationally challenging. Here, we explore the possible benefits, using our eigensolver for low-mode averaging and related methods with high and low accuracy eigenvectors. We develop a low-mode averaging type method using only a few of the smallest eigenvectors with low accuracy. This allows us to avoid expensive exact eigensolves, still benefitting from reduced statistical errors.

  7. Averaged null energy condition and quantum inequalities in curved spacetime

    E-Print Network [OSTI]

    Eleni-Alexandra Kontou

    2015-07-22

    The Averaged Null Energy Condition (ANEC) states that the integral along a complete null geodesic of the projection of the stress-energy tensor onto the tangent vector to the geodesic cannot be negative. ANEC can be used to rule out spacetimes with exotic phenomena, such as closed timelike curves, superluminal travel and wormholes. We prove that ANEC is obeyed by a minimally-coupled, free quantum scalar field on any achronal null geodesic (not two points can be connected with a timelike curve) surrounded by a tubular neighborhood whose curvature is produced by a classical source. To prove ANEC we use a null-projected quantum inequality, which provides constraints on how negative the weighted average of the renormalized stress-energy tensor of a quantum field can be. Starting with a general result of Fewster and Smith, we first derive a timelike projected quantum inequality for a minimally-coupled scalar field on flat spacetime with a background potential. Using that result we proceed to find the bound of a quantum inequality on a geodesic in a spacetime with small curvature, working to first order in the Ricci tensor and its derivatives. The last step is to derive a bound for the null-projected quantum inequality on a general timelike path. Finally we use that result to prove achronal ANEC in spacetimes with small curvature.

  8. Averaged null energy condition and quantum inequalities in curved spacetime

    E-Print Network [OSTI]

    Kontou, Eleni-Alexandra

    2015-01-01

    The Averaged Null Energy Condition (ANEC) states that the integral along a complete null geodesic of the projection of the stress-energy tensor onto the tangent vector to the geodesic cannot be negative. ANEC can be used to rule out spacetimes with exotic phenomena, such as closed timelike curves, superluminal travel and wormholes. We prove that ANEC is obeyed by a minimally-coupled, free quantum scalar field on any achronal null geodesic (not two points can be connected with a timelike curve) surrounded by a tubular neighborhood whose curvature is produced by a classical source. To prove ANEC we use a null-projected quantum inequality, which provides constraints on how negative the weighted average of the renormalized stress-energy tensor of a quantum field can be. Starting with a general result of Fewster and Smith, we first derive a timelike projected quantum inequality for a minimally-coupled scalar field on flat spacetime with a background potential. Using that result we proceed to find the bound of a qu...

  9. Plasma dynamics and a significant error of macroscopic averaging

    E-Print Network [OSTI]

    Marek A. Szalek

    2005-05-22

    The methods of macroscopic averaging used to derive the macroscopic Maxwell equations from electron theory are methodologically incorrect and lead in some cases to a substantial error. For instance, these methods do not take into account the existence of a macroscopic electromagnetic field EB, HB generated by carriers of electric charge moving in a thin layer adjacent to the boundary of the physical region containing these carriers. If this boundary is impenetrable for charged particles, then in its immediate vicinity all carriers are accelerated towards the inside of the region. The existence of the privileged direction of acceleration results in the generation of the macroscopic field EB, HB. The contributions to this field from individual accelerated particles are described with a sufficient accuracy by the Lienard-Wiechert formulas. In some cases the intensity of the field EB, HB is significant not only for deuteron plasma prepared for a controlled thermonuclear fusion reaction but also for electron plasma in conductors at room temperatures. The corrected procedures of macroscopic averaging will induce some changes in the present form of plasma dynamics equations. The modified equations will help to design improved systems of plasma confinement.

  10. Resource Form Factor and Installation of GFA Controllers

    SciTech Connect (OSTI)

    DeSteese, John G.; Hammerstrom, Donald J.

    2009-11-15

    The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly™ appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controller’s relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

  11. Fuel Cell Installation Improves Reliability and Saves Energy at a Corporate Data Center

    SciTech Connect (OSTI)

    2002-05-01

    In 2002, Chevron Energy Solutions implemented a fuel cell installation project at the corporate data center of Chevron Texaco's corporate headquarters in San Ramon, California.

  12. THE IMPACT OF CITY-LEVEL PERMITTING PROCESSES ON RESIDENTIAL PV INSTALLATION PRICES AND DEVELOPMENT TIMES

    E-Print Network [OSTI]

    Dong, Changgui

    2014-01-01

    Renewable Energy Council (13) Sunrun. 2011. The Impact ofSan Francisco, CA: Sunrun (14) Tong, J. 2012. NationwideTong, 2012); earlier, Sunrun (2011) reported PV installation

  13. Federal Grant Fully Funds Small Turbine Installation at Maine Senior Housing Complex

    SciTech Connect (OSTI)

    2009-02-26

    Article on a federal Residential Energy Assistance Challenge grant that funded the installation of a small wind turbine at a retirement center.

  14. Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels, September 2007

    Office of Energy Efficiency and Renewable Energy (EERE)

    A report addendum and final white paper for the Characterization of the Installed Costs of Prime Movers Using Gaseous Opportunity Fuels

  15. Property Tax Assessments as a Finance Vehicle for Residential PV Installations: Opportunities and Potential Limitations

    E-Print Network [OSTI]

    Bolinger, Mark

    2008-01-01

    for Renewable Energy ability to finance the installation offor Renewable Energy loans to finance their PV system (orany subsidized energy financing used to finance the system.

  16. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  17. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01

    to Drive Wind Development. . . . . . . . . . . . . . .5 GE Wind Is the Dominant Turbine Manufacturer, with SiemensAnnual Report on U.S. Wind Power Installation, Cost, and

  18. Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006

    E-Print Network [OSTI]

    2008-01-01

    wind energy generation costs, and generation costs cannot beand operating costs of new generation projects, whereas ourof installed generation, with costs recovered through

  19. Sundance, Skiing and Solar: Park City to Install New PV System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Content Specialist, Office of Public Affairs What does this project do? 80-panel solar energy system to be installed at Park City's Marsac Building. Recovery Act-funded...

  20. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  1. Consider Installing Turbulators on Two- and Three-Pass Firetube Boilers - Steam Tip Sheet #25

    SciTech Connect (OSTI)

    None

    2006-01-01

    This revised AMO tip sheet on installing turbulators on firetube boilers provides how-to advice for improving the system using low-cost, proven practices and technologies.

  2. Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

    E-Print Network [OSTI]

    Darghouth, Naim

    2012-01-01

    installed in 2007-2010. Tracking the Sun IV: The InstalledIncentive ($/W) Total Tracking the Sun IV: The InstalledIncentive ($/W) Total Tracking the Sun IV: The Installed

  3. CAPITAL PLANNING AND SPACE MANAGEMENT GUIDELINES FOR THE USE OF OUTDOOR SPACE ON THE CAMPUS OF

    E-Print Network [OSTI]

    CAPITAL PLANNING AND SPACE MANAGEMENT GUIDELINES FOR THE USE OF OUTDOOR SPACE ON THE CAMPUS SPACE AND OUTDOOR SPACE Capital Planning and Space Management offers event scheduling to student taking responsibility and agreeing to reimburse the University for the Cost of whatever damage

  4. The Kuznets-Kaldor-Puzzle and Neutral Cross-Capital-Intensity

    E-Print Network [OSTI]

    Güting, Ralf Hartmut

    The Kuznets-Kaldor-Puzzle and Neutral Cross-Capital-Intensity Structural Change by Denis Stijepic://www.fernuni-hagen.de/ls_wagner/en/ #12;The Kuznets-Kaldor-Puzzle and Neutral Cross- Capital-Intensity Structural Change* Denis Stijepic The Kuznets-Kaldor stylized facts are one of the most striking empirical observations about the development

  5. Financing U.S. Renewable Energy Projects Through Public Capital Vehicles: Qualitative and Quantitative Benefits

    SciTech Connect (OSTI)

    Mendelsohn, M.; Feldman, D.

    2013-04-01

    This paper explores the possibility of financing renewable energy projects through raising capital in the public markets. It gives an overview of the size, structure, and benefits of public capital markets, as well as showing how renewable energy projects might take advantage of this source of new funds to lower the cost of electricity.

  6. Impact of power purchases from nonutilities on the utility cost of capital

    SciTech Connect (OSTI)

    Kahn, E.; Stoft, S.; Belden, T. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.

    1994-03-01

    This report studies the debt-equivalence debate empirically. The topics of the study include a review of the literature on the cost of equity capital for regulated utilities, a formulation of the debate on NUGs and the utility`s cost of capital, a review of variable definitions and data sources, and a discussion of statistical issues and results.

  7. Trends in U.S. Venture Capital Investments Related to Energy: 1980-2007

    SciTech Connect (OSTI)

    Dooley, James J.

    2008-10-10

    This report documents trends in U.S. venture capital investments over the period 1980-2008. Particular attention is given to U.S. venture capital investments for “internet-specific”, biotechnology, and energy / industrial sectors over the period 1980-2007. During the early 1980s, U.S. venture capital investments in the energy / industrial area accounted for more than 20% of all venture capital investments. However subsequent periods of low energy prices and the emergence of fast growing new industries like computers (both hardware and software), biotechnology and the Internet quickly reduced the priority accorded to energy / industrial investments as by 2000 these investments accounted for only 1% of the $119 billion dollars invested that year by the U.S. venture capital community. The significant increase in the real price of oil that began in 2003-2004 correlates with renewed interest and increased investment by the venture capital community in energy / industrial investment opportunities. Venture capital investments in 2007 for the energy / industrial sector accounted for $3 billion or slightly more than 10% of all venture capital invested that year.

  8. Heterogeneous capital stocks and the optimal timing for CO2 abatement

    E-Print Network [OSTI]

    Heterogeneous capital stocks and the optimal timing for CO2 abatement Mark Jaccard *, Nic Rivers assumptions, an early start at CO2 abatement for long-lived capital stocks would be economically optimal for achieving long run targets for atmospheric CO2 concentrations. If the target is a specific concentration

  9. Capital accumulation and non-renewable energy resources: a special functions case

    E-Print Network [OSTI]

    Nesterov, Yurii

    2007/9 Capital accumulation and non-renewable energy resources: a special functions case Agustin Pérez-Barahona #12;CORE DISCUSSION PAPER 2007/9 Capital accumulation and non-renewable energy resources-run dynamics using Gauss Hypergeometric functions. Keywords: non-renewable resources, energy-saving technical

  10. Average vertical and zonal F region plasma drifts over Jicamarca

    SciTech Connect (OSTI)

    Fejer, B.G.; Gonzalez, S.A. (Utah State Univ., Logan (United States)); de Paula, E.R. (Inst. de Pesquisas Espaciais-INPE, Sao Paulo (Brazil) Utah State Univ., Logan (United States)); Woodman, R.F. (Inst. Geofisico del Peru, Lima (Peru))

    1991-08-01

    The seasonal averages of the equatorial F region vertical and zonal plasma drifts are determined using extensive incoherent scatter radar observations from Jicamarca during 1968-1988. The late afternoon and nighttime vertical and zonal drifts are strongly dependent on the 10.7-cm solar flux. The authors show that the evening prereversal enhancement of vertical drifts increases linearly with solar flux during equinox but tends to saturate for large fluxes during southern hemisphere winter. They examine in detail, for the first time, the seasonal variation of the zonal plasma drifts and their dependence on solar flux and magnetic activity. The seasonal effects on the zonal drifts are most pronounced in the midnight-morning sector. The nighttime eastward drifts increase with solar flux for all seasons but decrease slightly with magnetic activity. The daytime westward drifts are essentially independent of season, solar cycle, and magnetic activity.

  11. Average System Cost Methodology : Administrator's Record of Decision.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1984-06-01

    Significant features of average system cost (ASC) methodology adopted are: retention of the jurisdictional approach where retail rate orders of regulartory agencies provide primary data for computing the ASC for utilities participating in the residential exchange; inclusion of transmission costs; exclusion of construction work in progress; use of a utility's weighted cost of debt securities; exclusion of income taxes; simplification of separation procedures for subsidized generation and transmission accounts from other accounts; clarification of ASC methodology rules; more generous review timetable for individual filings; phase-in of reformed methodology; and each exchanging utility must file under the new methodology within 20 days of implementation by the Federal Energy Regulatory Commission of the ten major participating utilities, the revised ASC will substantially only affect three. (PSB)

  12. Making the Best Use of What you Have Asia Intellectual Capital Alliances a te ectua Cap ta a ce

    E-Print Network [OSTI]

    BYOBBYOB ­ Making the Best Use of What you Have Asia Intellectual Capital Alliances a te ectua Cap ta a ce 24 October 2011 Copyright © 2011 Asia Intellectual Capital Alliance. All rights reserved. #12

  13. Regional Transportation Coordination Plan for the Capital Area 

    E-Print Network [OSTI]

    Capital Area Regional Transit Coordination Committee

    2006-01-01

    in the State, as defined by the 24 council of government boundaries, should develop a regional coordination plan based on local needs and priorities. The Capital Area planning region includes the following 10 Central Texas counties: ? Llano ? Burnet ? Blanco... Change 2020 to 2030 Bastrop County 57,733 69,932 21% 76,195 9% 99,453 31% 127,344 28% Blanco County 8,418 9,110 8% 10,044 10% 11,916 19% 13,624 14% Burnet County 34,147 41,676 22% 42,694 2% 52,917 24% 63,529 20% Caldwell County 32,194 36,523 13% 40...

  14. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

  15. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

  16. Design and Installation of a Disposal Cell Cover Field Test

    SciTech Connect (OSTI)

    Benson, C.H. [University of Wisconsin–Madison, Madison, Wisconsin; Waugh, W.J. [S.M. Stoller Corporation, Grand Junction, Colorado; Albright, W.H. [Desert Research Institute, Reno, Nevada; Smith, G.M. [Geo-Smith Engineering, Grand Junction, Colorado; Bush, R.P. [U.S. Department of Energy, Grand Junction, Colorado

    2011-02-27

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

  17. Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

    SciTech Connect (OSTI)

    Lacey, Ph.D, P.E., Ronald E.

    2012-07-16

    Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

  18. Modified Force-Directed Scheduling for Peak and Average Power Optimization using Multiple Supply-Voltages

    E-Print Network [OSTI]

    Ramanujam, J. "Ram"

    - and a is the average number of transitions per clock phase heuristic for peak and average power cycle at the gate

  19. Hawaii Natural Energy Institute installs PV systems at public schools Pacific Business News

    E-Print Network [OSTI]

    well-established products in the solar industry. Three net-zero energy buildings created by CaliforniaHawaii Natural Energy Institute installs PV systems at public schools Pacific Business News Energy Institute said Tuesday that it has recently installed six solar photovoltaic systems totaling 15

  20. Siphon penstock installations at hydroelectric projects: A survey of design, construction and operating experience

    SciTech Connect (OSTI)

    Burgoine, D.; Rodrigue, P.; Tarbell, J.C. (Acres International Corp., Amherst, NY (USA); Acres International Corp., Amherst, NY (USA). Mechanical Engineering Dept.; Acres International Corp., Amherst, NY (USA))

    1989-01-01

    There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock installations. The design considerations, construction and operating aspects of siphon penstock installations are described here. 4 figs., 1 tab.

  1. Copyright Y. Daniel Liang, 2012 1 Installing the Cygwin C++ Compiler

    E-Print Network [OSTI]

    Liang, Y. Daniel

    © Copyright Y. Daniel Liang, 2012 1 Supplement Installing the Cygwin C++ Compiler For Introduction to C++ Programming Y. Daniel Liang You may download a free C++ compiler from several sources. This supplement shows you how to download and install the Cygwin compiler. 1. To download the Cygwin compiler, go

  2. (c) 2001, Laszlo Gulyas, Harvard University Installing a development environment for Java

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    (c) 2001, Laszlo Gulyas, Harvard University 1/19 Installing a development environment for Java This document will guide you through the process of installing a comfortable development environment for Java hard disk space (additional 120Mb for Java documentation)2 ·CD-ROM drive or good internet connection

  3. Solar Power Systems Find A Professional Solar Energy Installer For Any

    E-Print Network [OSTI]

    Lovley, Derek

    .CleanEnergyAuthority.com Install Solar Panels Enter Your Zip Code & Connect To Pre-Screened Solar Panel Installers www Power 4 Homes Save Thousands on Bills. Build your own Solar Panel for under $50! boxsolarpannle and uses solar energy more efficiently than plants. In fact, it provides a solution to one of the major

  4. Volume XVII, No. 5 A publication of the U.S. Army Installation Management Agency

    E-Print Network [OSTI]

    US Army Corps of Engineers

    /October 2005 U.S. Army Installation Management Agency In this issue: Energy and Water Conservation #12;2 Public Volkman 16 Commentary: Sustainable energy demands decisions that look beyond cost by Eileen WesterveltVolume XVII, No. 5 A publication of the U.S. Army Installation Management Agency September

  5. EXPERIMENTAL NON-DESTRUCTIVE TESTING OF FRP MATERIALS, INSTALLATION, AND PERFORMANCE, DALLAS COUNTY BRIDGE, MISSOURI, USA

    E-Print Network [OSTI]

    Maerz, Norbert H.

    EXPERIMENTAL NON-DESTRUCTIVE TESTING OF FRP MATERIALS, INSTALLATION, AND PERFORMANCE, DALLAS COUNTY provided the opportunity to use new and existing technologies to test the FRP materials installations alignment, FRP delamination, and FRP bond pull-off strength. Results of testing to date are presented

  6. Background: Subsurface Water Retention Technology (SWRT) Durable and easy to install: Water

    E-Print Network [OSTI]

    Background: Subsurface Water Retention Technology (SWRT) Benefits Durable and easy to install: Water retaining membranes can last at least 40 years and can be installed quickly and costeffectively permeable marginal soils converting them to much higher production levels of food crops. Better water

  7. Planning and Installation Guide: North Carolina Compressed Natural Gas Fueling Stations

    E-Print Network [OSTI]

    Introduction Are you considering installing a compressed natural gas (CNG) fueling station for your fleet of important items to consider when planning for a CNG station. Natural gas infrastructure, which is commonly - Others interested in installing a natural gas fueling station CNG fueling station under construction

  8. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    SciTech Connect (OSTI)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  9. On Capital Investment Yossi Azar1, Yair Bartal2, Esteban Feuerstein3, Amos Fiat1, Stefano Leonardi4 and

    E-Print Network [OSTI]

    Azar, Yossi

    over time, every such option consists of a capital cost for a new machine and a re- sulting the total production and capital costs when future demand for the product being produced and investment to the mortgage problem 3]. If all possible capital investments obey the rule that lower production costs require

  10. Capital Cost-Aware Design and Partial Shading-Aware Architecture Optimization of a Reconfigurable Photovoltaic System

    E-Print Network [OSTI]

    Pedram, Massoud

    Capital Cost-Aware Design and Partial Shading-Aware Architecture Optimization of a Reconfigurable, increase the capital cost of the PV system. In this paper, we group a number of PV cells into a PV macro-cell is the result of a trade-off between the decreased PV system capital cost and enhanced PV system performance

  11. On Capital Investment Yossi Azar 1 , Yair Bartal 2 , Esteban Feuerstein 3 , Amos Fiat 1 , Stefano Leonardi 4 and

    E-Print Network [OSTI]

    Fiat, Amos

    for investment occur over time, every such option consists of a capital cost for a new machine and a re­ sulting the total production and capital costs when future demand for the product being produced and investment to the mortgage problem [3]. If all possible capital investments obey the rule that lower production costs require

  12. UMBC Policy VIII-1.10.02 Page 1 of 4 UMBC Policy for Non-Capital and Sensitive Equipment

    E-Print Network [OSTI]

    Suri, Manil

    : The University defines non-capital equipment, as equipment with an acquisition cost greater than or equal to $2UMBC Policy VIII-1.10.02 Page 1 of 4 UMBC Policy for Non-Capital and Sensitive Equipment UMBC #VIII-1.10.02 Purpose: To provide adequate internal control over non-capital equipment and help ensure

  13. Dosimetry in Mammography: Average Glandular Dose Based on Homogeneous Phantom

    SciTech Connect (OSTI)

    Benevides, Luis A. [Naval Sea Systems Command,1333 Isaac Hull Avenue, Washington Navy Yard, DC 20376 (United States); Hintenlang, David E. [University of Florida, 202 Nuclear Sciences Center, P.O. Box 1183, Gainesville Florida 32611 (United States)

    2011-05-05

    The objective of this study was to demonstrate that a clinical dosimetry protocol that utilizes a dosimetric breast phantom series based on population anthropometric measurements can reliably predict the average glandular dose (AGD) imparted to the patient during a routine screening mammogram. AGD was calculated using entrance skin exposure and dose conversion factors based on fibroglandular content, compressed breast thickness, mammography unit parameters and modifying parameters for homogeneous phantom (phantom factor), compressed breast lateral dimensions (volume factor) and anatomical features (anatomical factor). The patient fibroglandular content was evaluated using a calibrated modified breast tissue equivalent homogeneous phantom series (BRTES-MOD) designed from anthropomorphic measurements of a screening mammography population and whose elemental composition was referenced to International Commission on Radiation Units and Measurements Report 44 and 46 tissues. The patient fibroglandular content, compressed breast thickness along with unit parameters and spectrum half-value layer were used to derive the currently used dose conversion factor (DgN). The study showed that the use of a homogeneous phantom, patient compressed breast lateral dimensions and patient anatomical features can affect AGD by as much as 12%, 3% and 1%, respectively. The protocol was found to be superior to existing methodologies. The clinical dosimetry protocol developed in this study can reliably predict the AGD imparted to an individual patient during a routine screening mammogram.

  14. Long-term average performance benefits of parabolic trough improvements

    SciTech Connect (OSTI)

    Gee, R.; Gaul, H.W.; Kearney, D.; Rabl, A.

    1980-03-01

    Improved parabolic trough concentrating collectors will result from better design, improved fabrication techniques, and the development and utilization of improved materials. The difficulty of achieving these improvements varies as does their potential for increasing parabolic trough performance. The purpose of this analysis is to quantify the relative merit of various technology advancements in improving the long-term average performance of parabolic trough concentrating collectors. The performance benefits of improvements are determined as a function of operating temperature for north-south, east-west, and polar mounted parabolic troughs. The results are presented graphically to allow a quick determination of the performance merits of particular improvements. Substantial annual energy gains are shown to be attainable. Of the improvements evaluated, the development of stable back-silvered glass reflective surfaces offers the largest performance gain for operating temperatures below 150/sup 0/C. Above 150/sup 0/C, the development of trough receivers that can maintain a vacuum is the most significant potential improvement. The reduction of concentrator slope errors also has a substantial performance benefit at high operating temperatures.

  15. Ensemble bayesian model averaging using markov chain Monte Carlo sampling

    SciTech Connect (OSTI)

    Vrugt, Jasper A; Diks, Cees G H; Clark, Martyn P

    2008-01-01

    Bayesian model averaging (BMA) has recently been proposed as a statistical method to calibrate forecast ensembles from numerical weather models. Successful implementation of BMA however, requires accurate estimates of the weights and variances of the individual competing models in the ensemble. In their seminal paper (Raftery etal. Mon Weather Rev 133: 1155-1174, 2(05)) has recommended the Expectation-Maximization (EM) algorithm for BMA model training, even though global convergence of this algorithm cannot be guaranteed. In this paper, we compare the performance of the EM algorithm and the recently developed Differential Evolution Adaptive Metropolis (DREAM) Markov Chain Monte Carlo (MCMC) algorithm for estimating the BMA weights and variances. Simulation experiments using 48-hour ensemble data of surface temperature and multi-model stream-flow forecasts show that both methods produce similar results, and that their performance is unaffected by the length of the training data set. However, MCMC simulation with DREAM is capable of efficiently handling a wide variety of BMA predictive distributions, and provides useful information about the uncertainty associated with the estimated BMA weights and variances.

  16. High average power magnetic modulator for copper lasers

    SciTech Connect (OSTI)

    Cook, E.G.; Ball, D.G.; Birx, D.L.; Branum, J.D.; Peluso, S.E.; Langford, M.D.; Speer, R.D.; Sullivan, J.R.; Woods, P.G.

    1991-06-14

    Magnetic compression circuits show the promise of long life for operation at high average powers and high repetition rates. When the Atomic Vapor Laser Isotope Separation (AVLIS) Program at Lawrence Livermore National Laboratory needed new modulators to drive their higher power copper lasers in the Laser Demonstration Facility (LDF), existing technology using thyratron switched capacitor inversion circuits did not meet the goal for long lifetimes at the required power levels. We have demonstrated that magnetic compression circuits can achieve this goal. Improving thyratron lifetime is achieved by increasing the thyratron conduction time, thereby reducing the effect of cathode depletion. This paper describes a three stage magnetic modulator designed to provide a 60 kV pulse to a copper laser at a 4. 5 kHz repetition rate. This modulator operates at 34 kW input power and has exhibited MTBF of {approx}1000 hours when using thyratrons and even longer MTBFs with a series of stack of SCRs for the main switch. Within this paper, the electrical and mechanical designs for the magnetic compression circuits are discussed as are the important performance parameters of lifetime and jitter. Ancillary circuits such as the charge circuit and reset circuit are shown. 8 refs., 5 figs., 1 tab.

  17. Energy Office Grant Helps the Virgin Islands Environmental Resource Station Install Solar Panels, Improve Efficiency, and Cut Monthly Energy Use Nearly 30% (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01

    This fact sheet highlights the energy challenges faced by the Virgin Islands Environmental Resource Station (VIERS), the renewable energy and energy efficiency solutions implemented, the resulting energy efficiency savings, and other project benefits. In 2011, VIERS installed a 9.4 kW solar system funded by a $50,000 American Recovery and Reinvestment Act (ARRA) grant, which was administered by VIEO. To identify additional energy-saving opportunities, VIERS performed an energy audit of appliances, which resulted in the removal of two water coolers and the installation of a water meter to monitor water use and how it relates to electric pump use. VIERS also added an educational component to the project, developing a solar classroom near the original solar system. By building on previous energy conservation measures and making additional investments in renewable energy technology, VIERS has lowered its average monthly energy consumption nearly 30%, even with an increase in guests. The VIERS efforts are not limited to the technology installations, however. They also serve to impact the youth of the U.S. Virgin Islands (USVI) by educating young people about energy efficiency and renewable energy technologies and their energy and environmental impacts. VIERS solar system is connected to the Web via a live feed that posts solar output data in real time, increasing the VIERS solar classroom's potential educational impact exponentially.

  18. Cooling energy performance and installation of a retrofitted exterior insulation and finish system on masonry residences in the southwestern United States

    SciTech Connect (OSTI)

    Ternes, M.P.; Wilkes, K.E.; McLain, H.A.

    1992-12-31

    A field test involving eight single-family houses was performed during the summer of 1991 in Scottsdale, Arizona to evaluate the potential of reducing air-conditioning electricity consumption and demand by insulating their exterior masonry walls using a site-fabricated (non-commercially available) insulation and finish system. The exterior insulation system developed for the field test was easily performed and should result in a durable installation. Total per house costs to perform the installations ranged from $3610 to $4550. The average annual savings was estimated to be 491 kWh, or 9% of pre-retrofit consumption. Peak demands without and with insulation on the hottest day of an average weather year for Phoenix were estimated to be 4.26 and 3.61 kill, for a demand reduction of 0.65 kill (15%). We conclude that exterior masonry wall insulation offers the greatest potential for air-conditioning electricity savings and peak demand reductions in hot, dry climates similar to that of Phoenix. Retrofit economics need to be thoroughly examined from societal, utility, and consumer perspectives and must consider other benefits such as space-heating energy savings and improved house value.

  19. Les Bons Ingredients pour un Haut Niveau de Performance des Installations Climatiques 

    E-Print Network [OSTI]

    Rougnon, J.

    2004-01-01

    ICEBO ? C ommiss 1 LES BONS INGREDIENTS POUR UN HAUT NIVEAU DE PERFORMANCE DES INSTALLATIONS CLIMATIQUES- Par Jean ROUGNON, Pr?sident de l?UCF ICEBO ? C ommiss 2 Une d?marche ?HAUT NIVEAU DE PERFORMANCE DES INSTALLATIONS CLIMATIQUES... = commissionnement !!! Un groupe de travail UCF cr?? pour donner une r?alit? concr?te au concept de commissionnement ICEBO ? C ommiss 3 Une r?gle /Un objectif Une R?gle : pour toutes installations,Performances ?nerg?tiques et qualit?s d?usage = valeurs reconnues...

  20. ECOLOGY & ENVIRONMENTAL SCIENCE Programs of Study The graduate program in Ecology & Environmental Science capitalizes on University

    E-Print Network [OSTI]

    Thomas, Andrew

    Science capitalizes on University strengths in ecology, environmental science, and environmental policy programs in ecology, environmental science, and environmental policy. The EES Graduate Program includes studying a wide range of challenging problems in ecology, environmental science, and environmental policy

  1. Seeds of growth : the challenges of venture capital in the Australian landscape

    E-Print Network [OSTI]

    Lu, Adrian C. (Adrian Chian)

    2012-01-01

    The Australian venture capital (VC) industry is young and relatively immature compared to the United States. Even though the first Australian VC firm appeared in 1970, the industry remained a niche with low levels of ...

  2. The development of an improved human capital index for assessing and forecasting national capacity and development 

    E-Print Network [OSTI]

    Verkhohlyad, Olha

    2009-05-15

    Human capital theory is accepted as one of the foundational theories of socioeconomic development. Although, according to founding scholars, any acquired qualities and abilities that help individuals and groups be economically ...

  3. Academic entrepreneurial ecosystem strategy in the New York state capital region

    E-Print Network [OSTI]

    Adsit, Daniel Mark

    2014-01-01

    The upstate New York regions are historically significant, but experienced economic decline throughout the later twentieth century. The New York State capital region, located approximately 150 miles north of New York City ...

  4. BPA's closes out the 2015 IPR2 process, decides to move EE capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cooperation debt. In the IPR2 close-out letter to the region, BPA Administrator Elliot Mainzer stressed to the region that moving the EE funding from capital to expense is...

  5. Dynamic cycles of strategy, marketing and sales : a framework for capital goods industries

    E-Print Network [OSTI]

    Rezende de Azevedo, Tadeu

    2013-01-01

    This thesis proposes a framework to help managers facing growth challenges or commoditization problems in business to business, particularly with capital goods. The framework is based on the proposition that strategy, ...

  6. Information Processing, Psychopathy, and Juror Decision Making in a Capital Murder Case 

    E-Print Network [OSTI]

    Cox, Jennifer

    2014-04-25

    by the judge. Specifically, participants were primed to employ a rational, analytical mindset or rely on their gut-instincts and intuition. Participants were then presented with a capital murder case vignette and expert testimony (clinical opinion or actuarial...

  7. How Credit Market Conditions Impact the Effect of Voluntary Disclosure on Firms' Cost of Debt Capital 

    E-Print Network [OSTI]

    Scott, Bret

    2012-10-19

    Prior literature finds that firms incur a lower cost of debt capital when they voluntarily disclose information. However, the economic literature demonstrates that creditors' lending standards become more stringent (lax) when credit is rationed...

  8. Assembly lead time reduction in a semiconductor capital equipment plant through constraint based scheduling

    E-Print Network [OSTI]

    Sedore, Blake William Clark

    2014-01-01

    The assembly protocols for a semiconductor capital equipment machine were analyzed for potential lead time reduction. The objective of this study was to determine the minimum assembly lead time for the machine based on the ...

  9. A Generalized Method for Estimation of Industrial Energy Savings from Capital and Behavioral Programs 

    E-Print Network [OSTI]

    Luneski, R. D.

    2011-01-01

    In 2005, NEEA engaged the food processing industry in the Northwest with a behavior based program called Continuous Energy Improvement (CEI). Industrial energy efficiency programs have historically been limited to large capital projects because...

  10. Reducing Energy Costs And Minimizing Capital Requirements: Case Studies of Thermal Energy Storage (TES) 

    E-Print Network [OSTI]

    Andrepont, J. S.

    2007-01-01

    Large cooling systems typically represent substantial capital investments and incur high operating energy costs. Cooling loads tend to peak during times of year and times of day when high ambient temperatures create a maximum demand for power...

  11. VENTURE CAPITAL, THE REGIONS AND PUBLIC POLICY: THE UNITED KINGDOM SINCE THE POST-2000 TECHNOLOGY CRASH

    E-Print Network [OSTI]

    Strathclyde, University of

    which gives greater emphasis to the demand-side. Key words: venture capital, regions, regional policy of the amount of money under management and the scale of investing. The subsequent ,,tech bust at the turn

  12. Balancing capital and condition : an emerging approach to facility investment strategy

    E-Print Network [OSTI]

    Wooldridge, Stephen C. (Stephen Craig), 1967-

    2002-01-01

    Capital facilities - land and buildings - provide a long-standing environment in which public and private enterprise works, communicates, and thrives. Aligning how facilities "fit" with the dynamic demands of enterprise ...

  13. UTILITY INVESTMENT IN ON-SITE SOLAR: RISK AND RETURN ANALYSIS FOR CAPITALIZATION AND FINANCING

    E-Print Network [OSTI]

    Kahn, E.

    2011-01-01

    electric back- for on-site solar may cost more on the marginAssumptions Solar Hot Water Heater Capital Cost AnnualThe Cost of Energy from Utility-Owned Solar Electric

  14. Home-based work, human capital accumulation and women's labor force participation 

    E-Print Network [OSTI]

    Chutubtim, Piyaluk

    2006-10-30

    This dissertation examines the effect of changes in the stock of human capital on the labor force participation decision of women aged 25-54. Without the option of homebased work, some women choose to leave the labor market ...

  15. Spreading The Word: Capital Market Consequences of Business Press Coverage of Management Earnings Guidance 

    E-Print Network [OSTI]

    Twedt, Brady J

    2013-06-21

    This study investigates the role of the business press in disseminating management earnings guidance news to capital market participants. Using a unique sample of over 55,000 articles that relate specifically to management guidance, I find that 48...

  16. Assembly lead time reduction in a semiconductor capital equipment plant through improved material kitting

    E-Print Network [OSTI]

    Jain, Sonam

    2014-01-01

    Manufacturing operations were studied at a semiconductor capital equipment manufacturing plant, with an aim to reduce the production time of their longest lead time module. Preliminary analysis was done by observing the ...

  17. FACILITIES ENGINEER WEST CHICAGO Execute capital projects for manufacturing facilities and utilities systems: scope development, cost

    E-Print Network [OSTI]

    Heller, Barbara

    FACILITIES ENGINEER ­ WEST CHICAGO OVERVIEW: Execute capital projects for manufacturing, and externally. Additional duties as assigned. QUALIFICATIONS: BS in Engineering from ABETaccredited program, or PE certification, required. 5+ years of experience in manufacturing engineering environment

  18. JOB SEARCH PATTERNS OF COLLEGE GRADUATES: THE ROLE OF SOCIAL CAPITAL

    E-Print Network [OSTI]

    Coonfield, Emily Suzanne

    2012-12-31

    This dissertation addresses job search patterns of college graduates and the implications of social capital by race and class. The purpose of this study is to explore (1) how the job search transpires for recent college graduates, (2) how potential...

  19. Growth strategies : how software start-ups can leverage alliances, acquisitions, IPOs and venture capital

    E-Print Network [OSTI]

    Ybanez, Sergio D

    2007-01-01

    The identification of the different factors impacting a software start-up company's decision to pursue an alliance, acquisition, IPO or venture capital to sustain growth is the main objective of this research study. First ...

  20. Structuring public REIT-sponsored private capital fund : the case of US industrial and retail REITs

    E-Print Network [OSTI]

    Lee, Cervantes (Cervantes Chih-Chieh), 1975-

    2008-01-01

    The private capital business for public REITs was started by Kimco Realty, Developer Diversified, AMB and ProLogis during the years 1998-2000, at the time when the public equity was not easily available. Over the past ...