Solid Oxide Fuel Cell Auxiliary Power Unit  

SciTech Connect

Solid Oxide Fuel Cell (SOFC) is an attractive, efficient, clean source of power for transportation, military, and stationary applications. Delphi has pioneered its application as an auxiliary Power Unit (APU) for transportation. Delphi is also interested in marketing this technology for stationary applications. Its key advantages are high efficiency and compatibility with gasoline, natural gas and diesel fuel. It's consistent with mechanizations that support the trend to low emissions. Delphi is committed to working with customers and partners to bring this novel technology to market.

J. Weber

2001-12-12T23:59:59.000Z

2

Evaluation of Fuel Cell Auxiliary Power Units for Heavy-Duty Diesel Trucks  

E-Print Network (OSTI)

J. , Gottesfeld, S. , 1999. Direct methanol fuel cells.Fuel cells for transportation. 1999 Annual Progress Report.Auxiliary power units; Fuel cells 1. Introduction A large

2002-01-01T23:59:59.000Z

3

Evaluation of Fuel Cell Auxiliary Power Units for Heavy-Duty Diesel Trucks  

E-Print Network (OSTI)

Fuel cells for transportation. 1999 Annual Progress Report.J. , Gottesfeld, S. , 1999. Direct methanol fuel cells.Auxiliary power units; Fuel cells 1. Introduction A large

2002-01-01T23:59:59.000Z

4

Solid Oxide Fuel Cell Auxiliary Power Units for Long-Haul Trucks  

E-Print Network (OSTI)

SOFC Technology R& D Needs Steven Shaffer Chief Engineer ­ Fuel Cell Development DOE Pre) to define system level requirements for a Fuel Cell (SOFC) based Auxiliary Power Unit (APU SOFC X #12;9 DOE Pre-Solicitation Workshop, Golden CO Field Office SOFC Stack Development Key Stack

5

Diesel-fueled solid oxide fuel cell auxiliary power units for heavy-duty vehicles  

DOE Green Energy (OSTI)

This paper explores the potential of solid oxide fuel cells (SOFCS) as 3--10 kW auxiliary power units for trucks and military vehicles operating on diesel fuel. It discusses the requirements and specifications for such units, and the advantages, challenges, and development issues for SOFCS used in this application. Based on system design and analysis, such systems should achieve efficiencies approaching 40% (lower heating value), with a relatively simple system configuration. The major components of such a system are the fuel cell stack, a catalytic autothermal reformer, and a spent gas burner/air preheater. Building an SOFC-based auxiliary power unit is not straightforward, however, and the tasks needed to develop a 3--10 kW brassboard demonstration unit are outlined.

Krause, T.; Kumar, R.; Krumpelt, M.

2000-05-15T23:59:59.000Z

6

Fuel Preprocessor (FPP) for a Solid Oxide Fuel Cell Auxiliary Power Unit  

DOE Green Energy (OSTI)

Auxiliary Power Units (APUs), driven by truck engines, consume over 800 million gallon of diesel fuel while idling. Use of separate SOFC based APUs are an excellent choice to reduce the cost and pollution associated with producing auxiliary power. However, diesel fuel is a challenging fuel to use in fuel cell systems because it has heavy hydrocarbons that can transform into carbon deposits and gums that can block passages and deactivate fuel reformer and fuel cell reactor elements. The work reported herein addresses the challenges associated with the diesel fuel sulfur and carbon producing contaminants in a Fuel Preprocessor (FPP). FPP processes the diesel fuel onboard and ahead of the reformer to reduce its carbon deposition tendency and its sulfur content, thus producing a fuel suitable for SOFC APU systems. The goal of this DOE supported Invention and Innovation program was to design, develop and test a prototype Fuel Preprocessor (FPP) that efficiently and safely converts the diesel fuel into a clean fuel suitable for a SOFC APU system. The goals were achieved. A 5 kWe FPP was designed, developed and tested. It was demonstrated that FPP removes over 80% of the fuel sulfur and over 90% of its carbon residues and it was demonstrated that FPP performance exceeds the original project goals.

M. Namazian, S. Sethuraman and G. Venkataraman

2004-12-31T23:59:59.000Z

7

RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 6, April 1958-July 1958  

SciTech Connect

A modular concept has evolved which permits testing of SNAP-1 as an attachable unit. Integrity testing of fuel elements in simulated pad aborts is reported. The adequacy of a full-scale boiler mockup in vaporizing mercury at the design point was tested; a new boiler coil designed to prevent slugging was tested. The sintering properties of CeO/sub 2/ were further investigated. Dynamic mercury corrosion testing of Croloy 5 Si and Croloy 5 Ti is reported. Static lead tests of CeO/sub 2/ pellets, brazed joints, and flame sprayed coatings continued. Testing of the power conversion system turbine, centrifugal pumps, controls, radial gap alternator, bearings, and steels is described. Design of a facility for testing the APU module is under way. A conceptual design of SNAP-3 was delineated. (N.W.R.)

1963-10-31T23:59:59.000Z

8

RADIOISOTOPE FUELED AUXILIARY POWER UNIT. Quarterly Progress Report No. 7, July-September 1958  

SciTech Connect

Progress made in the development of SNAP-1 and -3 is reported. SNAP-1 development reported includes: boiler development, fuel development, properties of cerium dioxide, materials corrosion, power conversion system development, shielding analysis, hazards evaluation, and ground test development. SNAP-3 development includes: power conversion analysis, thermoelectric generator development, and fuel element development. Information is given on the handling and transportation equipment for SNAP-1. (N.W.R.)

1963-10-31T23:59:59.000Z

9

Study on Relay Protection Coordination in Complex Auxiliary Power System  

Science Conference Proceedings (OSTI)

In many large-scale power plants, the structure of its auxiliary power system are complex, and the coordination of its relay protections is difficult. The Three Gorges Hydropower Plant is the largest installed capacity of power plants with complex auxiliary ... Keywords: auxiliary power system, relay protection, coordination

Yawen Yi; Jun Xie; Na Yi

2010-06-01T23:59:59.000Z

10

Optimization of Auxiliaries Consumption in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Operators of nuclear power plants face significant challenges to produce power more cost-effectively. One approach to producing power more cost-effectively is to reduce power consumption by auxiliary systems in the plant, leading to more power available for the grid. This report provides guidance for assessing auxiliary system performance and recommends approaches to reduce their power consumption. The report also presents results from questionnaires on auxiliary system consumption and, in some cases, ac...

2005-02-08T23:59:59.000Z

11

Auxiliary power supply with kinetic energy storage  

SciTech Connect

Alternating current is supplied to an auxiliary load on a from a power supply comprised of a dc-energized inverter and a synchronous machine coupled to the inverter. The inverter supplies the alternating current requirements of the load up to the normal steady state load current magnitude. The synchronous machine stores kinetic energy when the load current load does not exceed its normal steady state magnitude, and converts kinetic energy into electrical energy to supply the load current requirements in excess of its normal steady-state load magnitude and to supply load current whenever the dc source inverter connection is interrupted. Frequency and amplitude of load voltage are regulated by operator commands through control apparatus coupled to the inverter and the synchronous machine.

Plunkett, A.B.; Turnbull, F.G.

1982-03-23T23:59:59.000Z

12

Auxiliary power controls on the Nelson River HVDC scheme  

SciTech Connect

This paper describes the auxiliary power controls on the Nelson River HVDC scheme. It shows how the fast control feature of the HVDC link can be utilized to enhance the operation of an integrated ac/dc power system.

Chand, J. (Manitoba Hydro, Winnipeg, Manitoba (CA))

1992-02-01T23:59:59.000Z

13

DIRECT ENERGY CONVERSION DEVICES AND SYSTEMS FOR NUCLEAR AUXILIARY POWER (SNAP). A Literature Search  

SciTech Connect

A total of 553 references are listed on the SNAP program and related topics. The references were taken from Nuclear Science Abstracts to Dec. 31, 1962. The contents are arranged in sections on radioisotope-fueled units, reactorfueled units, direct energy conversion, and general topics on nuclear auxiliary power. (J.R.D.)

Lanier, S.F.; Raleigh, H.D.

1963-01-01T23:59:59.000Z

14

Using Auxiliary Gas Power for CCS Energy Needs in Retrofitted Coal Power Plants  

E-Print Network (OSTI)

1 Using Auxiliary Gas Power for CCS Energy Needs in Retrofitted Coal Power Plants by Sarah Bashadi and Policy Program #12;2 #12;3 Using Auxiliary Gas Power for CCS Energy Needs in Retrofitted Coal Power-combustion capture retrofits are expected to a near-term option for mitigating CO2 emissions from existing coal

15

Precision control of high temperature furnaces using an auxiliary power supply and charged particle current flow  

DOE Patents (OSTI)

Two power supplies are combined to control a furnace. A main power supply heats the furnace in the traditional manner, while the power from the auxiliary supply is introduced as a current flow through charged particles existing due to ionized gas or thermionic emission. The main power supply provides the bulk heating power and the auxiliary supply provides a precise and fast power source such that the precision of the total power delivered to the furnace is improved. 5 figs.

Pollock, G.G.

1997-01-28T23:59:59.000Z

16

Precision control of high temperature furnaces using an auxiliary power supply and charged practice current flow  

DOE Patents (OSTI)

Two power supplies are combined to control a furnace. A main power supply heats the furnace in the traditional manner, while the power from the auxiliary supply is introduced as a current flow through charged particles existing due to ionized gas or thermionic emission. The main power supply provides the bulk heating power and the auxiliary supply provides a precise and fast power source such that the precision of the total power delivered to the furnace is improved.

Pollock, George G. (San Ramon, CA)

1997-01-01T23:59:59.000Z

17

1 2Using Auxiliary Gas Power for CCS Energy Needs in Retrofitted Coal Power Plants  

E-Print Network (OSTI)

Post-combustion capture retrofits are expected to a near-term option for mitigating CO2 emissions from existing coal-fired power plants. Much of the literature proposes using power from the existing coal plant and thermal integration of its supercritical steam cycle with the stripper reboiler to supply the energy needed for solvent regeneration and CO2 compression. This study finds that using an auxiliary natural gas turbine plant to meet the energetic demands of carbon capture and compression may make retrofits more attractive compared to using thermal integration in some circumstances. Natural gas auxiliary plants increase the power output of the base plant and reduce technological risk associated with CCS, but require favorable natural gas prices and regional electricity demand for excess electricity to make using an auxiliary plant more desirable. Three different auxiliary plant technologies were compared to integration for 90 % capture from an existing, 500 MW supercritical coal plant. CO2 capture and compression is simulated using Aspen Plus and a monoethylamine (MEA) absorption process. Thermoflow software is used to simulate three gas plant technologies. The three technologies assessed are the

Sarah Bashadi; Howard Herzog; Dava J. Newman; Sarah Bashadi

2010-01-01T23:59:59.000Z

18

Staff Analysis of Proposed Installation of Two New Selective Catalytic Reduction (SCR) Units on the Project’s Two Auxiliary  

E-Print Network (OSTI)

The modification(s) proposed in the petition would install two new Selective Catalytic Reduction (SCR) units on the project’s two auxiliary boilers. The addition of a SCR system on each boiler would allow the project to comply with recent changes to the Bay Area Air Quality Management District regulations for emissions of nitrogen oxides (NOx) for auxiliary boilers. The Bay Area Air Quality Management District has determined that the project proposal would result in new permit to operate requirements from the district. The Gilroy Cogeneration Project is a 115-megawatt, natural gas-fired power plant located in the City of Gilroy in Santa Clara County. The project was certified by the

Edmund G. Brown

2013-01-01T23:59:59.000Z

19

Growth of fuel cell applications for specialty vehicles, portable power, auxiliary power, backup power, and stationary power are expected to generate a range of new jobs in the  

E-Print Network (OSTI)

Growth of fuel cell applications for specialty vehicles, portable power, auxiliary power, backup engineers · Power plant operators · Power plant maintenance staff · Bus, truck and other fleet drivers power, and stationary power are expected to generate a range of new jobs in the near term

20

SYSTEMS FOR NUCLEAR AUXILIARY POWER. A REPORT BY THE COMMISSION, 1964  

SciTech Connect

The uses and possible systems for auxiliary power, particularly for space applications, are indicated; and the extent to which nuclear systems meet the requirements is discussed. The current and planned development programs are outlined, and the AEC's conclusions on the overall SNAP program are presented. The status, characteristics, and uses of various SNAP generators are tabulated. (D.C.W.)

1964-10-31T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Reducing Substation Auxiliary Power in the Consolidated Edison System  

Science Conference Proceedings (OSTI)

This demonstration/study project carried out by the Electric Power Research Institute (EPRI), who partnered with Consolidated Edison (Con Edison), has identified and documented energy-efficiency measures applicable within a substation. The study was conducted on four substations identified by Con Edison as candidates for potential energy-efficiency improvementW 49th St, W 50th St, Millwood, and E 179th St. The substation locations selected are representative of the many substations that are in Con Edison...

2012-05-31T23:59:59.000Z

22

Solid Oxide Fuel Cell Development for Auxiliary Power in Heavy Duty Vehicle Applications  

Science Conference Proceedings (OSTI)

Changing economic and environmental needs of the trucking industry is driving the use of auxiliary power unit (APU) technology for over the road haul trucks. The trucking industry in the United States remains the key to the economy of the nation and one of the major changes affecting the trucking industry is the reduction of engine idling. Delphi Automotive Systems, LLC (Delphi) teamed with heavy-duty truck Original Equipment Manufacturers (OEMs) PACCAR Incorporated (PACCAR), and Volvo Trucks North America (VTNA) to define system level requirements and develop an SOFC based APU. The project defines system level requirements, and subsequently designs and implements an optimized system architecture using an SOFC APU to demonstrate and validate that the APU will meet system level goals. The primary focus is on APUs in the range of 3-5 kW for truck idling reduction. Fuels utilized were derived from low-sulfur diesel fuel. Key areas of study and development included sulfur remediation with reformer operation; stack sensitivity testing; testing of catalyst carbon plugging and combustion start plugging; system pre-combustion; and overall system and electrical integration. This development, once fully implemented and commercialized, has the potential to significantly reduce the fuel idling Class 7/8 trucks consume. In addition, the significant amounts of NOx, CO2 and PM that are produced under these engine idling conditions will be virtually eliminated, inclusive of the noise pollution. The environmental impact will be significant with the added benefit of fuel savings and payback for the vehicle operators / owners.

Daniel T. Hennessy

2010-06-15T23:59:59.000Z

23

Diesel Reforming for Fuel Cell Auxiliary Power Units  

DOE Green Energy (OSTI)

This objective of this project was to develop technology suitable for onboard reforming of diesel. The approach was to examine catalytic partial oxidation and steam reforming.

Borup, R.; Parkinson, W. J.; Inbody, M.; Brosha, E.L.; Guidry, D.R.

2005-01-27T23:59:59.000Z

24

Mathematical model for the bridge-type auxiliary impulse commutated power inverter  

SciTech Connect

This paper presents analytical picture for the utilization of the auxiliary impulse commutated inverter in connection with various direct energy conversion devices. To ensure effective inversion, V-A switching characteristics as well as power handling capacities with respect to interconnected modules have to be matched with loading conditions at the inverter output. Mathematical model for this inverter could be used as the basic criterion for expressing the time varying voltage output with respect to the specific applied from the direct energy conversion device. Pure sinusoidal inverter output voltage could be secured through total neutralization of impulse and DC components by filtering.

Denno, K.

1980-12-01T23:59:59.000Z

25

Diesel Fueled SOFC for Class 7/Class 8 On-Highway Truck Auxiliary Power  

DOE Green Energy (OSTI)

The following report documents the progress of the Cummins Power Generation (CPG) Diesel Fueled SOFC for Class 7/Class 8 On-Highway Truck Auxiliary Power (SOFC APU) development and final testing under the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy (EERE) contract DE-FC36-04GO14318. This report overviews and summarizes CPG and partner development leading to successful demonstration of the SOFC APU objectives and significant progress towards SOFC commercialization. Significant SOFC APU Milestones: Demonstrated: Operation meeting SOFC APU requirements on commercial Ultra Low Sulfur Diesel (ULSD) fuel. SOFC systems operating on dry CPOX reformate. Successful start-up and shut-down of SOFC APU system without inert gas purge. Developed: Low cost balance of plant concepts and compatible systems designs. Identified low cost, high volume components for balance of plant systems. Demonstrated efficient SOFC output power conditioning. Demonstrated SOFC control strategies and tuning methods.

Vesely, Charles John-Paul [Cummins Power Generation; Fuchs, Benjamin S. [Cummins Power Generation; Booten, Chuck W. [Protonex Technology, LLC

2010-03-31T23:59:59.000Z

26

Using auxiliary gas power for CCS energy needs in retrofitted coal power plants  

E-Print Network (OSTI)

Post-combustion capture retrofits are expected to a near-term option for mitigating CO 2 emissions from existing coal-fired power plants. Much of the literature proposes using power from the existing coal plant and thermal ...

Bashadi, Sarah (Sarah Omer)

2010-01-01T23:59:59.000Z

27

Investigation of Auxiliary Power Substation 95A4 fault and fire, Portsmouth Gaseous Diffusion Plant, March 24, 1982  

SciTech Connect

On March 24, 1982, an electrical fault and resultant fire in the 480 volt Auxiliary Power Substation 95A4 at the Portsmouth Gaseous Diffusion Plant destroyed that substation. There were no personal injuries, the overall loss was limited to the Substation, and the cost of replacing the Substation with repaired and new components has been estimated at $184,000. At the time of the incident, Goodyear was involved in a project to replace the obsolete 480 volt circuit breaker of the Auxiliary Power System. This project involved the disassembly, refurishing, and reassembly of 480 volt circuit breaker carriages by Goodyear personnel. The fault occurred in a circuit breaker upgraded under this project. The investigation of this accident is reported. The evidence suggests the fault resulted from the improper assembly of an upgraded 480 volt circuit breaker. Compounding the problem and leading to the extensive damage was the failure of the transformer secondary breaker to trip open as designed and interrupt the flow of power to the substation. It is surmised that inadequate testing during preventive maintenance contributed to this condition. Additional factors which may have contributed to the accident included: no requirements for assuring the competence of the electricians who installed the circuit breakers, no specific assembly instructions to the electricians, inadequate procedure instructions, and an inadequate procedure governing operational or load testing of the breaker. (LCL)

1982-06-01T23:59:59.000Z

28

Auxiliary feedwater system risk-based inspection guide for the Maine Yankee Nuclear Power Plant  

SciTech Connect

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. The information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Maine Yankee was selected as one of a series of plants for study. ne product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Maine Yankee plant.

Gore, B.F.; Vo, T.V.; Moffitt, N.E.; Bumgardner, J.D. (Pacific Northwest Lab., Richland, WA (United States))

1992-10-01T23:59:59.000Z

29

Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant  

Science Conference Proceedings (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant.

Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1993-12-01T23:59:59.000Z

30

Overview of the small engine component technology (SECT) studies. [Commuter, rotorcraft, cruise missile and auxiliary power applications in year 2000  

SciTech Connect

The objectives of the joint NASA/Army SECT studies were to identify high payoff technologies for year 2000 small gas turbine engine applications and to provide a technology plan for guiding future research and technology efforts applicable to rotorcraft, commuter and general aviation aircraft and cruise missiles. Competitive contracts were awarded to Allison, AVCO Lycoming, Garrett, Teledyne CAE and Williams International. This paper presents an overview of the contractors' study efforts for the commuter, rotorcraft, cruise missile, and auxiliary power (APU) applications with engines in the 250 to 1000 horsepower size range. Reference aircraft, missions and engines were selected. Advanced engine configurations and cycles with projected year 2000 component technologies were evaluated and compared with a reference engine selected by the contractor. For typical commuter and rotorcraft applications, fuel savings of 22 percent to 42 percent can be attained. For $1/gallon and $2/gallon fuel, reductions in direct operating cost range from 6 percent to 16 percent and from 11 percent to 17 percent respectively. For subsonic strategic cruise missile applications, fuel savings of 38 percent to 54 percent can be achieved which allows 35 percent to 60 percent increase in mission range and life cycle cost reductions of 40 percent to 56 percent. High payoff technologies have been identified for all applications. 5 references.

Vanco, M.R.; Wintucky, W.T.; Niedwiecki, R.W.

1986-01-01T23:59:59.000Z

31

Low-temperature fuel cell systems for commercial airplane auxiliary power.  

SciTech Connect

This presentation briefly describes the ongoing study of fuel cell systems on-board a commercial airplane. Sandia's current project is focused on Proton Exchange Membrane (PEM) fuel cells applied to specific on-board electrical power needs. They are trying to understand how having a fuel cell on an airplane would affect overall performance. The fuel required to accomplish a mission is used to quantify the performance. Our analysis shows the differences between the base airplane and the airplane with the fuel cell. There are many ways of designing a system, depending on what you do with the waste heat. A system that requires ram air cooling has a large mass penalty due to increased drag. The bottom-line impact can be expressed as additional fuel required to complete the mission. Early results suggest PEM fuel cells can be used on airplanes with manageable performance impact if heat is rejected properly. For PEMs on aircraft, we are continuing to perform: (1) thermodynamic analysis (investigate configurations); (2) integrated electrical design (with dynamic modeling of the micro grid); (3) hardware assessment (performance, weight, and volume); and (4) galley and peaker application.

Curgus, Dita Brigitte; Pratt, Joseph William; Akhil, Abbas Ali; Klebanoff, Leonard E.

2010-11-01T23:59:59.000Z

32

Factors driving wind power development in the United States  

E-Print Network (OSTI)

s Largest Purchase of Wind Power,” September 17, 2001.FACTORS DRIVING WIND POWER DEVELOPMENT IN THE UNITED STATESthe United States third in wind power capacity globally,

Bird, Lori A.; Parsons, Brian; Gagliano, Troy; Brown, Matthew H.; Wiser, Ryan H.; Bolinger, Mark

2003-01-01T23:59:59.000Z

33

Lianyungang Zhongneng United Wind Power Co Ltd | Open Energy...  

Open Energy Info (EERE)

Page Edit with form History Facebook icon Twitter icon Lianyungang Zhongneng United Wind Power Co Ltd Jump to: navigation, search Name Lianyungang Zhongneng United Wind Power...

34

NETL: SECA - A Primer on SOFC Technology - SOFC Power Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

SOFC Power Systems SOFC power generation applications can range from small (e.g., 3 to 10 kWe) power systems for the home or small business, or as auxiliary power units (APU's) for...

35

United Power, Inc | Open Energy Information  

Open Energy Info (EERE)

Power, Inc Power, Inc Place Colorado Utility Id 19499 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Retail Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1150/kWh Commercial: $0.0990/kWh Industrial: $0.0830/kWh The following table contains monthly sales and revenue data for United Power, Inc (Colorado). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS

36

Wind Power Price Trends in the United States  

E-Print Network (OSTI)

Review] Wind Power Price Trends in the United States Markof these drivers – i.e. , trends in U.S. wind power prices –Capacity Wind Power Price Trends in the U.S. Berkeley Lab

Bolinger, Mark

2010-01-01T23:59:59.000Z

37

Auxiliary resonant DC tank converter  

SciTech Connect

An auxiliary resonant dc tank (ARDCT) converter is provided for achieving soft-switching in a power converter. An ARDCT circuit is coupled directly across a dc bus to the inverter to generate a resonant dc bus voltage, including upper and lower resonant capacitors connected in series as a resonant leg, first and second dc tank capacitors connected in series as a tank leg, and an auxiliary resonant circuit comprising a series combination of a resonant inductor and a pair of auxiliary switching devices. The ARDCT circuit further includes first clamping means for holding the resonant dc bus voltage to the dc tank voltage of the tank leg, and second clamping means for clamping the resonant dc bus voltage to zero during a resonant period. The ARDCT circuit resonantly brings the dc bus voltage to zero in order to provide a zero-voltage switching opportunity for the inverter, then quickly rebounds the dc bus voltage back to the dc tank voltage after the inverter changes state. The auxiliary switching devices are turned on and off under zero-current conditions. The ARDCT circuit only absorbs ripples of the inverter dc bus current, thus having less current stress. In addition, since the ARDCT circuit is coupled in parallel with the dc power supply and the inverter for merely assisting soft-switching of the inverter without participating in real dc power transmission and power conversion, malfunction and failure of the tank circuit will not affect the functional operation of the inverter; thus a highly reliable converter system is expected.

Peng, Fang Z. (Knoxville, TN)

2000-01-01T23:59:59.000Z

38

Performance of ECM controlled VAV fan powered terminal units  

E-Print Network (OSTI)

Empirical performance models of fan airflow, primary airflow and power consumption were developed for series and parallel variable air volume fan powered terminal units. An experimental setup and test procedure were created to test the terminal units at typical design pressures and airflows. Each terminal unit observed in this study used an 8 in (20.3 cm) primary air inlet. Two fan motor control methods were considered. The primary control of interest was the electronically commutated motor (ECM) controller. Data collected were compared with previous research regarding silicon rectified control (SCR) units. Generalized models were developed for both series and parallel terminal units. Coefficients for performance models were then compared with comparable SCR controlled units. Non-linear statistical modeling was performed using SPSS software (2008). In addition to airflow and power consumption modeling, power quality was also quantified. Relationships between real power (watts) and apparent power (VA) were presented as well as harmonic frequencies and total harmonic distortion. Power quality was recorded for each ECM controlled terminal unit tested. Additional tests were also made to SCR controlled terminal units used in previous research (Furr 2006). The airflow and power consumption performance models had an R2 equal to 0.990 or greater for every terminal unit tested. An air leakage model was employed to account for leakage in the parallel designed VAV terminal units when the internal fan was turned off. For the leakage model, both ECM and SCR controlled units achieved an R2 greater than or equal to 0.918.

Cramlet, Andrew Charles

2008-08-01T23:59:59.000Z

39

Guodian United Power Technology Co Ltd formerly Guodian Union Power | Open  

Open Energy Info (EERE)

United Power Technology Co Ltd formerly Guodian Union Power United Power Technology Co Ltd formerly Guodian Union Power Jump to: navigation, search Name Guodian United Power Technology Co Ltd (formerly Guodian Union Power) Place Beijing, Beijing Municipality, China Zip 100044 Sector Wind energy Product China-based wind turbine maker and daughter company of state-owned power generator China Guodian. References Guodian United Power Technology Co Ltd (formerly Guodian Union Power)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Guodian United Power Technology Co Ltd (formerly Guodian Union Power) is a company located in Beijing, Beijing Municipality, China . References ↑ "Guodian United Power Technology Co Ltd (formerly Guodian

40

Wind Power Development in the United States: The Perfect (Wind...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Power Development in the United States: The Perfect (Wind) Storm? Speaker(s): Mark Bolinger Date: February 25, 2008 - 12:00pm Location: 90-3122 Wind power development is...

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Solar powered unitized regenerative fuel cell system  

Science Conference Proceedings (OSTI)

Solar hydrogen system is a unique power system that can meet the power requirement for the energy future demand, in such a system the hydrogen used to be the energy carrier which can produced through electrolysis by using the power from the PV during ... Keywords: electrolyzer, fuel cell, hydrogen, photovoltaic, regenerative, solar hydrogen system

Salwan S. Dihrab; , Kamaruzzaman Sopian; Nowshad Amin; M. M. Alghoul; Azami Zaharim

2008-02-01T23:59:59.000Z

42

Thermal Unit Commitment Including Optimal AC Power Flow Constraints  

E-Print Network (OSTI)

Thermal Unit Commitment Including Optimal AC Power Flow Constraints Carlos Murillo{Sanchez Robert J algorithm for unit commitment that employs a Lagrange relaxation technique with a new augmentation. This framework allows the possibility of committing units that are required for the VArs that they can produce

43

United Power - Renewable Energy Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United Power - Renewable Energy Rebate Program United Power - Renewable Energy Rebate Program United Power - Renewable Energy Rebate Program < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Maximum Rebate PV: 2,250 Wind: 1,500 Solar Water Heating: 1,000 Program Info State Colorado Program Type Utility Rebate Program Rebate Amount PV: 0.75/W Wind: 0.50/W Solar Water Heating: 25/MBtu Provider United Power United Power is providing rebates to their customers for the purchase of photovoltaic (PV), wind, and solar water heating systems. These incentives are separate from the rebates provided by the Colorado Governor's Energy Office and require separate applications. PV and wind systems must be grid-connected. Systems up to 25 kW in capacity may be installed, but

44

Auxiliary battery charging terminal  

SciTech Connect

In accordance with the present invention there is provided an auxiliary battery charging terminal that may selectively engage battery charging circuitry inside a portable radio pager. There is provided a current conducting cap having a downwardly and outwardly flared rim that deforms to lock under the crimped edge an insulating seal ring of a standard rechargeable cell by application of a compressive axial force. The auxiliary battery charging terminal is further provided with a central tip axially projecting upwardly from the cap. The auxiliary terminal may be further provided with a cap of reduced diameter to circumferentially engage the raised battery cathode terminal on the battery cell. A mating recess in a remote battery charging receptacle may receive the tip to captivate the battery cell against lateral displacement. The tip may be further provided with a rounded apex to relieve localized frictional forces upon insertion and removal of the battery cell from the remote battery charging receptacle.

Field, H.; Richter, R. E.

1985-04-23T23:59:59.000Z

45

A delta configured auxiliary resonant snubber inverter  

SciTech Connect

A delta ({Delta}) configured auxiliary resonant snubber inverter is developed to overcome the voltage floating problem in a wye (Y) configured resonant snubber inverter. The proposed inverter is to connect auxiliary resonant branches between phase outputs to avoid a floating point voltage which may cause over-voltage failure of the auxiliary switches. Each auxiliary branch consists of a resonant inductor and a reverse blocking auxiliary switch. Instead of using an anti-paralleled diode to allow resonant current to flow in the reverse direction, as in the Y-configured version, the resonant branch in the {Delta}-configured version must block the negative voltage, typically done by a series diode. This paper shows single-phase and three-phase versions of {Delta}-configured resonant snubber inverters and describes in detail the operating principle of a single-phase version. The extended three-phase version is proposed with non-adjacent state space vector modulation. For hardware implementation, a single-phase 1-kW unit and a three-phase 100-kW unit were built to prove the concept. Experimental results show the superiority of the proposed topology.

Lai, J.S.; Young, R.W.; Ott, G.W. Jr.; McKeever, J.W. [Oak Ridge National Lab., TN (United States). Engineering Technology Div.; Peng, F.Z. [Univ. of Tennessee, Knoxville, TN (United States)]|[Oak Ridge National Lab., TN (United States)

1995-09-01T23:59:59.000Z

46

BioPower Application (United States) | Open Energy Information  

Open Energy Info (EERE)

BioPower Application (United States) BioPower Application (United States) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: BioPower Application (United States) Focus Area: Ethanol Topics: Potentials & Scenarios Website: rpm.nrel.gov/biopower/biopower/launch Equivalent URI: cleanenergysolutions.org/content/biopower-application-united-states,ht Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation BioPower is an interactive map for comparing biomass feedstocks and biopower by location. This tool helps users select from and apply biomass data layers to a map as well as query and download biopower and feedstock data. The analysis function offers common conversion factors that allow users to determine the potential biopower production for a selected

47

Solid Oxide Fuel Cell Diesel Auxiliary Power Unit Demonstration - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Dan Hennessy (Primary Contact), Jim Banna Delphi Automotive Systems, LLC 300 University Drive m/c 480-300-385 Auburn Hills, MI 48326 Phone: (248) 732-0656 Email: daniel.t.hennessy@delphi.com DOE Managers HQ: Dimitrios Papageorgopoulos Phone: (202) 586-5463 Email: Dimitrios.Papageorgopoulos@ee.doe.gov GO: David Peterson Phone: (720) 356-1747 Email: David.Peterson@go.doe.gov Contract Number: DE-EE0000478 Subcontractors: * Electricore, Inc., Valencia, CA * PACCAR, Inc., Bellevue, WA * TDA Research, Inc., Wheat Ridge, CO Project Start Date: August 1, 2009 Project End Date: April 30, 2013 Objectives

48

BETWEEN UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

12-SLC-0663 12-SLC-0663 CONTRACT NO. 12-SLC-0663 BETWEEN UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION COLORADO RIVER STORAGE PROJECT MANAGEMENT CENTER AND SHELL ENERGY NORTH AMERICA FOR PURCHASE OF POWER Contract No. 12-SLC-0663 1 TABLE OF CONTENTS Section Title Page No. 1 Preamble ............................................................................................................... 2 2 Explanatory Recitals ............................................................................................ 2 3 Agreement ............................................................................................................. 3 4 Term of Contract .................................................................................................. 3

49

Surgut steam power plant: Block 1, unit 1 reconstruction feasibility study. Volume 2. Export trade information  

Science Conference Proceedings (OSTI)

Project Description; Work Tasks: Review Plant Data; Power Cycle, Heat Balance Study; Heat Cycle Screening and Selection; Selected Heat Cycle Discussion; Heat Balance Summary Data and Diagram; Plant Conceptual Engineering; Major Mechanical System Descriptions; Main, Reheat, District Heating Steam Systems; Feedwater and Condensate System; HRSG Blowdown System; Chemical Feed System; Auxiliary Cooling System; Natural Gas Fuel System; Piping System; and Flue Gas System.

Not Available

1993-11-24T23:59:59.000Z

50

United Power - Energy Efficiency Rebate Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Rebate Program Energy Efficiency Rebate Program United Power - Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Manufacturing Water Heating Program Info State Colorado Program Type Utility Rebate Program Rebate Amount Geothermal Heat Pump: $2,500 + $150/ton TSGT rebate* Air-Source Heat Pumps: $400 + $125-150/ton TSGT rebate Terminal Units: $235 Energy Star Heat Pump Bonus: $100 - $150 Electric Water Heater: $70 - $650, depending on conditions and features Electric Resistive Heat Units: $350/unit Electric Thermal Storage Units: $350/unit + $16/kW TSGT rebate Energy Star Appliances Refrigerator/Freezer: $40 Refrigerator/Freezer Recycling: $75

51

New Report Finds the United States Leading in Wind Power Growth  

New Report Finds the United States Leading in Wind Power Growth For the third year in a row, the United States was the fastest growing wind power ...

52

Design Considerations for a PEM Fuel Cell Powered Truck APU  

E-Print Network (OSTI)

Design of a Truck- mounted Fuel Cell APU System. Society ofEngine Idling Versus Fuel Cell APUs. ” Society of AutomotiveJr; 2003. Evaluation of Fuel Cell Auxiliary Power Units for

Grupp, David J; Forrest, Matthew E.; Mader, Pippin G.; Brodrick, Christie-Joy; Miller, Marshall; Dwyer, Harry A.

2004-01-01T23:59:59.000Z

53

Impact of Wind PowerImpact of Wind Power Forecasting on Unit  

E-Print Network (OSTI)

Impact of Wind PowerImpact of Wind Power Forecasting on Unit Commitment and Dispatchp Jianhui Wang and University of Porto, Portugal 8th Int. Wind Integration Workshop, Bremen, Germany, Oct. 14 2009 #12;Outline of the information in wind power forecasts in system and market operationsin system and market operations Stochastic

Hudson, Randy

54

A modified unit decommitment algorithm in combined heat and power production planning  

Science Conference Proceedings (OSTI)

This paper addresses the unit commitment in multi-period combined heat and power (CHP) production planning, considering the possibility to trade power on the spot market. We present a modified unit decommitment algorithm (MUD) that starts with a good ... Keywords: combined heat and power production, deregulated power market, energy optimization, modelling, modified unit decommitment, unit commitment

Aiying Rong; Risto Lahdelma

2007-01-01T23:59:59.000Z

55

Radionuclides in United States commercial nuclear power reactors  

SciTech Connect

In the next ten to twenty years, many of the commercial nuclear power reactors in the United States will be reaching their projected lifetime of forty years. As these power plants are decommissioned, it seems prudent to consider the recycling of structural materials such as stainless steel. Some of these materials and components have become radioactive through either nuclear activation of the elements within the components or surface contamination with radioactivity form the operational activities. In order to understand the problems associated with recycling stainless steel from decommissioned nuclear power reactors, it is necessary to have information on the radionuclides expected on or in the contaminated materials. A study has been conducted of radionuclide contamination information that is available for commercial nuclear power reactors in the United States. There are two types of nuclear power reactors in commercial use in the United States, pressurized water reactors (PWRs) and boiling water reactors (BWRs). Before presenting radionuclide activities information, a brief discussion is given on the major components and operational differences for the PWRs and BWRs. Radionuclide contamination information is presented from 11 PWRs and over 8 BWRs. These data include both the radionuclides within the circulating reactor coolant water as well as radionuclide contamination on and within component parts.

Bechtold, T.E. [ed.] [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Dyer, N.C. [Oregon Graduate Inst. of Science and Technology, Beaverton, OR (United States)

1994-01-01T23:59:59.000Z

56

Inventory of power plants in the United States, 1993  

SciTech Connect

The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), U.S. Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

Not Available

1994-12-01T23:59:59.000Z

57

Inventory of Power Plants in the United States, October 1992  

Science Conference Proceedings (OSTI)

The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), US Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The report is organized into the following chapters: Year in Review, Operable Electric Generating Units, and Projected Electric Generating Unit Additions. Statistics presented in these chapters reflect the status of electric generating units as of December 31, 1992.

Not Available

1993-10-27T23:59:59.000Z

58

Wind Power Price Trends in the United States  

SciTech Connect

For the fourth year in a row, the United States led the world in adding new wind power capacity in 2008, and also surpassed Germany to take the lead in terms of cumulative installed wind capacity. The rapid growth of wind power in the U.S. over the past decade (Figure 1) has been driven by a combination of increasingly supportive policies (including the Federal production tax credit (PTC) and a growing number of state renewables portfolio standards), uncertainty over the future fuel costs and environmental liabilities of natural gas and coal-fired power plants, and wind's competitive position among generation resources. This article focuses on just the last of these drivers - i.e., trends in U.S. wind power prices - over the period of strong capacity growth since 1998.

Bolinger, Mark; Wiser, Ryan

2009-07-15T23:59:59.000Z

59

Inventory of power plants in the United States 1994  

SciTech Connect

The Inventory of Power Plants in the US provides year-end statistics on generating units operated by electric utilities in the US (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of December 31, 1994. The publication also provides a 10-year outlook for generating unit additions. This report is prepared annually by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy (DOE). Data summarized in this report are useful to a wide audience including Congress, Federal, and State agencies; the electric utility industry; and the general public. This is a report of electric utility data; in cases where summary data of nonutility capacity are presented, it is specifically noted as such.

NONE

1995-10-18T23:59:59.000Z

60

Advanced IGCC power systems for the United States  

SciTech Connect

Integrated coal gasification combined-cycle (IGCC) power systems offer the potential of superior efficiency and environmental performance over power plants using pulverized coal-fired boilers with scrubbers to generate electricity in the United States. The Cool Water plant is demonstrating the feasibility of an IGCC system using an entrained-bed gasifier and ''cold'' gas cleanup technology. Technology is now being developed to simplify the IGCC system, increase its efficiency and reduce its capital costs. Hot gas sulfur and particulate cleanup is the most promising technology option for the gas supply block. Improved performance is also available from the power island by use of high-efficiency aircraft derivative turbines. Progress in these technologies and the exceptional match of these IGCC systems to the projected needs of the utility industry is presented.

Wieber, P.R.; Halow, J.S.

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Wind Power Plant Evaluation Naval Auxiliary Landing Field, San Clemente Island, California: Period of Performance 24 September 1999--15 December 2000  

DOE Green Energy (OSTI)

The purpose of this report is to evaluate the wind power benefits and impacts to the San Clement Island wind power system, including energy savings, emissions reduction, system stability, and decreased naval dependence on fossil fuel at the island. The primary goal of the SCI wind power system has been to operate with the existing diesel power plant and provide equivalent or better power quality and system reliability than the existing diesel system. The wind system is intended to reduce, as far as possible, the use of diesel fuel and the inherent generation of nitrogen oxide emissions and other pollutants.

Olsen, T.L.; Gulman, P.J.; McKenna, E.

2000-12-11T23:59:59.000Z

62

Power systems simulations of the western United States region.  

DOE Green Energy (OSTI)

This report documents a part of a broad assessment of energy-water-related issues in the western United States. The full analysis involved three Department of Energy national laboratories: Argonne National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratories. Argonne's objective in the overall project was to develop a regional power sector expansion forecast and a detailed unit-level operational (dispatch) analysis. With these two major analysis components, Argonne estimated current and future freshwater withdrawals and consumption related to the operation of U.S. thermal-electric power plants in the Western Electricity Coordinating Council (WECC) region for the period 2005-2025. Water is withdrawn and used primarily for cooling but also for environmental control, such as sulfur scrubbers. The current scope of the analysis included three scenarios: (1) Baseline scenario as a benchmark for assessing the adequacy and cost-effectiveness of water conservation options and strategies, (2) High nuclear scenario, and (3) High renewables scenario. Baseline projections are consistent with forecasts made by the WECC and the Energy Information Administration (EIA) in its Annual Energy Outlook (AEO) (EIA 2006a). Water conservation scenarios are currently limited to two development alternatives that focus heavily on constructing new generating facilities with zero water consumption. These technologies include wind farms and nuclear power plants with dry cooling. Additional water conservation scenarios and estimates of water use associated with fuel or resource extraction and processing will be developed in follow-on analyses.

Conzelmann, G.; Koritarov, V.; Poch, L.; Thimmapuram, P.; Veselka, T.; Decision and Information Sciences

2010-03-15T23:59:59.000Z

63

Improving Energy Efficiency of Auxiliaries  

DOE Green Energy (OSTI)

The summaries of this report are: Economics Ultimately Dictates Direction; Electric Auxiliaries Provide Solid Benefits. The Impact on Vehicle Architecture Will be Important; Integrated Generators With Combined With Turbo Generators Can Meet the Electrical Demands of Electric Auxiliaries; Implementation Will Follow Automotive 42V Transition; Availability of Low Cost Hardware Will Slow Implementation; Industry Leadership and Cooperation Needed; Standards and Safety Protocols Will be Important. Government Can Play an Important Role in Expediting: Funding Technical Development; Incentives for Improving Fuel Economy; Developing Standards, Allowing Economy of Scale; and Providing Safety Guidelines.

Carl T. Vuk

2001-12-12T23:59:59.000Z

64

High voltage bus and auxiliary heater control system for an electric or hybrid vehicle  

DOE Green Energy (OSTI)

A control system for an electric or hybrid electric vehicle includes a vehicle system controller and a control circuit having an electric immersion heater. The heater is electrically connected to the vehicle's high voltage bus and is thermally coupled to a coolant loop containing a heater core for the vehicle's climate control system. The system controller responds to cabin heat requests from the climate control system by generating a pulse width modulated signal that is used by the control circuit to operate the heater at a duty cycle appropriate for the amount of cabin heating requested. The control system also uses the heater to dissipate excess energy produced by an auxiliary power unit and to provide electric braking when regenerative braking is not desirable and manual braking is not necessary. The control system further utilizes the heater to provide a safe discharge of a bank of energy storage capacitors following disconnection of the battery or one of the high voltage connectors used to transmit high voltage operating power to the various vehicle systems. The control circuit includes a high voltage clamping circuit that monitors the voltage on the bus and operates the heater to clamp down the bus voltage when it exceeds a pre-selected maximum voltage. The control system can also be used to phase in operation of the heater when the bus voltage exceeds a lower threshold voltage and can be used to phase out the auxiliary power unit charging and regenerative braking when the battery becomes fully charged.

Murty, Balarama Vempaty (West Bloomfield, MI)

2000-01-01T23:59:59.000Z

65

Wind Power Development in the United States: Current Progress, Future Trends  

E-Print Network (OSTI)

Annual Report on U.S. Wind Power Installation, Cost, andWind Power Development in the United States: Current94720 Abstract: The U.S. wind power industry is in an era of

Wiser, Ryan H

2009-01-01T23:59:59.000Z

66

United Power - Business Energy Efficiency Rebate Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Energy Efficiency Rebate Program Business Energy Efficiency Rebate Program United Power - Business Energy Efficiency Rebate Program < Back Eligibility Commercial Industrial Savings Category Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Lighting System Replacement: $20,000 per project LED Street/Area Lighting: $20,000 per project Refrigerated Case Lighting: $3,000 per project Program Info State Colorado Program Type Utility Rebate Program Rebate Amount Lighting System Replacement: $250 per kW calculated, or 50% of invoiced equipment costs Refrigerated Case Lighting (Reach In): $60 per door Refrigerated Case Lighting (Top Lighting Multi-Deck): $10 per lineal foot LED Street/Area Lighting: Lesser of 25% of head costs or $200 per head Electric Motor: $2/HP + $8/HP from Tri-State

67

Factors driving wind power development in the United States  

SciTech Connect

In the United States, there has been substantial recent growth in wind energy generating capacity, with growth averaging 24 percent annually during the past five years. About 1,700 MW of wind energy capacity was installed in 2001, while another 410 MW became operational in 2002. This year (2003) shows promise of significant growth with more than 1,500 MW planned. With this growth, an increasing number of states are experiencing investment in wind energy projects. Wind installations currently exist in about half of all U.S. states. This paper explores the key factors at play in the states that have achieved a substantial amount of wind energy investment. Some of the factors that are examined include policy drivers, such as renewable portfolio standards (RPS), federal and state financial incentives, and integrated resource planning; as well as market drivers, such as consumer demand for green power, natural gas price volatility, and wholesale market rules.

Bird, Lori A.; Parsons, Brian; Gagliano, Troy; Brown, Matthew H.; Wiser, Ryan H.; Bolinger, Mark

2003-05-15T23:59:59.000Z

68

Waste Heat Powered Ammonia Absorption Refrigeration Unit for LPG Recovery  

SciTech Connect

An emerging DOE-sponsored technology has been deployed. The technology recovers light ends from a catalytic reformer plant using waste heat powered ammonia absorption refrigeration. It is deployed at the 17,000 bpd Bloomfield, New Mexico refinery of Western Refining Company. The technology recovers approximately 50,000 barrels per year of liquefied petroleum gas that was formerly being flared. The elimination of the flare also reduces CO2 emissions by 17,000 tons per year, plus tons per year reductions in NOx, CO, and VOCs. The waste heat is supplied directly to the absorption unit from the Unifiner effluent. The added cooling of that stream relieves a bottleneck formerly present due to restricted availability of cooling water. The 350oF Unifiner effluent is cooled to 260oF. The catalytic reformer vent gas is directly chilled to minus 25oF, and the FCC column overhead reflux is chilled by 25oF glycol. Notwithstanding a substantial cost overrun and schedule slippage, this project can now be considered a success: it is both profitable and highly beneficial to the environment. The capabilities of directly-integrated waste-heat powered ammonia absorption refrigeration and their benefits to the refining industry have been demonstrated.

Donald C, Energy Concepts Co.; Lauber, Eric, Western Refining Co.

2008-06-20T23:59:59.000Z

69

Inventory of Nonutility Electric Power Plants in the United States  

Reports and Publications (EIA)

Final issue of this report. Provides annual aggregate statistics on generating units operated by nonutilities in the United States and the District of Columbia. Provides a 5-year outlook for generating unit additions and changes.

Information Center

2003-01-01T23:59:59.000Z

70

UNITED STATES DEPARTMENT OF ENERGY SOUTHWESTERN POWER ADMINISTRATION  

NLE Websites -- All DOE Office Websites (Extended Search)

OF ENERGY SOUTHWESTERN POWER ADMINISTRATION RATE SCHEDULE RDW-12 1 WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN MUNICIPAL POWER AGENCY (CONTRACT NO....

71

AMERICAN ELECTRIC POWER'S CONESVILLE POWER PLANT UNIT NO.5 CO2 CAPTURE RETROFIT STUDY  

SciTech Connect

ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with American Electric Power (AEP), ABB Lummus Global Inc. (ABB), the US Department of Energy National Energy Technology Laboratory (DOE NETL), and the Ohio Coal Development Office (OCDO) to conduct a comprehensive study evaluating the technical feasibility and economics of alternate CO{sub 2} capture and sequestration technologies applied to an existing US coal-fired electric generation power plant. The motivation for this study was to provide input to potential US electric utility actions concerning GHG emissions reduction. If the US decides to reduce CO{sub 2} emissions, action would need to be taken to address existing power plants. Although fuel switching from coal to natural gas may be one scenario, it will not necessarily be a sufficient measure and some form of CO{sub 2} capture for use or disposal may also be required. The output of this CO{sub 2} capture study will enhance the public's understanding of control options and influence decisions and actions by government, regulators, and power plant owners in considering the costs of reducing greenhouse gas CO{sub 2} emissions. The total work breakdown structure is encompassed within three major reports, namely: (1) Literature Survey, (2) AEP's Conesville Unit No.5 Retrofit Study, and (3) Bench-Scale Testing and CFD Evaluation. The report on the literature survey results was issued earlier by Bozzuto, et al. (2000). Reports entitled ''AEP's Conesville Unit No.5 Retrofit Study'' and ''Bench-Scale Testing and CFD Evaluation'' are provided as companion volumes, denoted Volumes I and II, respectively, of the final report. The work performed, results obtained, and conclusions and recommendations derived therefrom are summarized.

Carl R. Bozzuto; Nsakala ya Nsakala; Gregory N. Liljedahl; Mark Palkes; John L. Marion

2001-06-30T23:59:59.000Z

72

PEV-based Reactive Power Compensation for Wind DG Units: A Stackelberg Game Approach  

E-Print Network (OSTI)

turbine's inductive load to ensure a stable voltage profile in the system. Since reactive power can only from the load centers, DG units will speed up the revolution of providing power on site with little unit. Reactive power compensa- tion is needed since the load is not pure resistive and may include

Wu, Chenye

73

Backgrounder: Geothermal resource production, steam gathering, and power generation at Salton Sea Unit 3, Calipatria, California  

DOE Green Energy (OSTI)

The 10,000-kilowatt Salton Sea Unit 1 power plant was designed to demonstrate that electrical power generation, using the highly saline brines from the Salton Sea geothermal reservoir, was technically and economically feasible. Unit 1, owned by Earth Energy, a Unocal subsidiary, began operating in 1982, initiating an intensive testing program which established the design criteria necessary to construct the larger 47,500-kilowatt Unit 3 power plant, unit 3 contains many of the proprietary or patented technological innovations developed during this program. Design, construction and start-up of the Unit 3 power generating facility began in December, 1986, and was completed in 26 months. By the end of 1988, the brine handling system was in full operation, and the turbine had been tested at design speed. Desert Power Company, a Unocal subsidiary, owns the power generating facility. Unocal owns the brine resource production facility. Power is transmitted by the Imperial Irrigation District to Southern California Edison Company.

None

1989-04-01T23:59:59.000Z

74

Wind Power Price Trends in the United States  

E-Print Network (OSTI)

price of power from new U.S. wind projects higher in 2009.should eventually help wind power regain the downward pricein Modern Energy Review] Wind Power Price Trends in the

Bolinger, Mark

2010-01-01T23:59:59.000Z

75

Wind Power Price Trends in the United States  

E-Print Network (OSTI)

should eventually help wind power regain the downward priceModern Energy Review] Wind Power Price Trends in the Unitedled the world in adding new wind power capacity in 2008, and

Bolinger, Mark

2010-01-01T23:59:59.000Z

76

Inventory of Electric Utility Power Plants in the United States 2000  

U.S. Energy Information Administration (EIA)

DOE/EIA-0095(2000) Inventory of Electric Utility Power Plants in the United States 2000 March 2002 Energy Information Administration Office of Coal, Nuclear, Electric

77

Wind Power Development in the United States: Current Progress, Future Trends  

E-Print Network (OSTI)

and India. The technology has matured and, in good windWind Power Capacity Incremental Capacity (2007, MW) United States China Spain Germany India

Wiser, Ryan H

2009-01-01T23:59:59.000Z

78

Demonstration of Clyde Bergemann Water Cannons at Alabama Power Company's Plant Miller Unit 1  

Science Conference Proceedings (OSTI)

This report documents the findings of a demonstration of Clyde Bergemann Water Cannons at Alabama Power Company's Plant Miller Unit 1.

2004-11-08T23:59:59.000Z

79

Viability of an expanded United States nuclear power program and its effects on energy markets  

E-Print Network (OSTI)

The four biggest energy sources in the United States are coal, crude oil, natural gas, and nuclear power. While coal and nuclear power are produced domestically, more than 70% of crude oil and 20% of natural gas is imported. ...

Khan, Tanzeer S

2006-01-01T23:59:59.000Z

80

How many and what kind of power plants are there in the United ...  

U.S. Energy Information Administration (EIA)

How many and what kind of power plants are there in the United States? There are about 19,023 individual generators at about 6,997 operational power ...

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Impact of High Wind Power Penetration on Hydroelectric Unit Operations  

SciTech Connect

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-01-01T23:59:59.000Z

82

Green Power Marketing in the United States: A Status Report (11th Edition)  

Science Conference Proceedings (OSTI)

This report documents green power marketing activities and trends in the United States. It presents aggregate green power sales data for all voluntary purchase markets across the United States. It also provides summary data on utility green pricing programs offered in regulated electricity markets and green power marketing activity in competitive electricity markets, as well as green power sold to voluntary purchasers in the form of renewable energy certificates. Key market trends and issues are also discussed.

Bird, L.; Kreycik, C.; Friedman, B.

2008-10-01T23:59:59.000Z

83

Factors driving wind power development in the United States  

E-Print Network (OSTI)

incentives, and integrated resource planning; as well as market drivers, such as consumer demand for green power, natural gas

Bird, Lori A.; Parsons, Brian; Gagliano, Troy; Brown, Matthew H.; Wiser, Ryan H.; Bolinger, Mark

2003-01-01T23:59:59.000Z

84

Improved taguchi method based contracted capacity optimization for power consumer with self-owned generating units  

Science Conference Proceedings (OSTI)

The paper proposes an improved Taguchi method to determine the best capacity contracts and dispatch the power output of the self-owned generating units from almost infinite combinations. To be achieved are savings of total power expenses of the consumers ... Keywords: capacity contracts, improved Taguchi method, self-owned generating units

Hong-Tzer Yang; Pai-Chun Peng; Chung-His Huang

2007-05-01T23:59:59.000Z

85

Unit-Contingent Power Purchase Agreement and Asymmetric Information About Plant Outage  

Science Conference Proceedings (OSTI)

This paper analyzes a unit-contingent power purchase agreement between an electricity distributor and a power plant. Under such a contract the distributor pays the plant a fixed price if the plant is operational and nothing if plant outage occurs. Pricing ... Keywords: electricity industry, risk allocation, spot market, unit-contingent contract

Owen Q. Wu; Volodymyr Babich

2012-04-01T23:59:59.000Z

86

Solving the Unit Commitment Problem in Power Generation by Primal and Dual Methods \\Lambda  

E-Print Network (OSTI)

deals with the fuel cost optimal scheduling of on/off decisions and output levels for generating unitsSolving the Unit Commitment Problem in Power Generation by Primal and Dual Methods \\Lambda D and results of test runs are reported. 1 Introduction The unit commitment problem in electricity production

Römisch, Werner

87

Green Power Marketing in the United States: A Status Report (2009 Data)  

Science Conference Proceedings (OSTI)

This report documents green power marketing activities and trends in the United States. First, aggregate green power sales data for all voluntary purchase markets across the United States are presented. Next, we summarize data on utility green pricing programs offered in regulated electricity markets; green power marketing activity in competitive electricity markets, as well as green power sold to voluntary purchasers in the form of RECs; and renewable energy sold as greenhouse gas offsets in the United States. Finally, this is followed by a discussion of key market trends and issues. The data presented in this report are based primarily on figures provided to NREL by utilities and independent renewable energy marketers.

Bird, L.; Sumner, J.

2010-09-01T23:59:59.000Z

88

Inventory of Electric Utility Power Plants in the United States  

Reports and Publications (EIA)

Final issue of this report. Provides detailed statistics on existing generating units operated by electric utilities as of December 31, 2000, and certain summary statistics about new generators planned for operation by electric utilities during the next 5 years.

Information Center

2002-03-01T23:59:59.000Z

89

Characterization of wind power resource in the United States  

E-Print Network (OSTI)

Wind resource in the continental and offshore United States has been reconstructed and characterized using metrics that describe, apart from abundance, its availability, persistence and intermittency. The Modern Era ...

Gunturu, Udaya Bhaskar

90

Green Power Marketing in the United States: A Status Report ...  

NLE Websites -- All DOE Office Websites (Extended Search)

entities include a certain percentage of renewable energy within their power generation mix; the percentages required and eligibility requirements vary among the states. Eligible...

91

Green Power Marketing in the United States: A Status Report ...  

NLE Websites -- All DOE Office Websites (Extended Search)

some REC products blend other renewable energy sources, such as biomass (typically biogas) and solar. Green Power Sales According to data provided by marketers, about 6,000...

92

PureComfort 240 Combined Cooling, Heating, and Power Unit  

Science Conference Proceedings (OSTI)

This report is an interim case study of a PureComfort 240 combined cooling, heating and power project at the University of Toronto, Mississauga.

2006-03-28T23:59:59.000Z

93

Factors driving wind power development in the United States  

E-Print Network (OSTI)

for green power, natural gas price volatility, and wholesalethe past several years, natural gas prices have experiencedonly from inflated natural gas prices but also from supply-

Bird, Lori A.; Parsons, Brian; Gagliano, Troy; Brown, Matthew H.; Wiser, Ryan H.; Bolinger, Mark

2003-01-01T23:59:59.000Z

94

Damodar Valley Corporation, Chandrapura Unit 2 Thermal Power Station Residual Life Assessment Summary report  

Science Conference Proceedings (OSTI)

The BHEL/NTPC/PFC/TVA teams assembled at the DVC`s Chadrapura station on July 19, 1994, to assess the remaining life of Unit 2. The workscope was expanded to include major plant systems that impact the unit`s ability to sustain generation at 140 MW (Units 1-3 have operated at average rating of about 90 MW). Assessment was completed Aug. 19, 1994. Boiler pressure parts are in excellent condition except for damage to primary superheater header/stub tubes and economizer inlet header stub tubes. The turbine steam path is in good condition except for damage to LP blading; the spar rotor steam path is in better condition and is recommended for Unit 2. Nozzle box struts are severely cracked from the flame outs; the cracks should not be repaired. HP/IP rotor has surface cracks at several places along the steam seal areas; these cracks are shallow and should be machined out. Detailed component damage assessments for above damaged components have been done. The turbine auxiliary systems have been evaluated; cooling tower fouling/blockage is the root cause for the high turbine back pressure. The fuel processing system is one of the primary root causes for limiting unit capacity. The main steam and hot reheat piping systems were conservatively designed and have at least 30 years left;deficiencies needing resolution include restoration of insulation, replacement of 6 deformed hanger clamp/bolts, and adjustment of a few hanger settings. The cold reheat piping system is generally in good condition; some areas should be re-insulated and the rigid support clamps/bolts should be examined. The turbine extraction piping system supports all appeared to be functioning normally.

NONE

1995-02-01T23:59:59.000Z

95

Optimal control system design of an acid gas removal unit for an IGCC power plants with CO2 capture  

Science Conference Proceedings (OSTI)

Future IGCC plants with CO{sub 2} capture should be operated optimally in the face of disturbances without violating operational and environmental constraints. To achieve this goal, a systematic approach is taken in this work to design the control system of a selective, dual-stage Selexol-based acid gas removal (AGR) unit for a commercial-scale integrated gasification combined cycle (IGCC) power plant with pre-combustion CO{sub 2} capture. The control system design is performed in two stages with the objective of minimizing the auxiliary power while satisfying operational and environmental constraints in the presence of measured and unmeasured disturbances. In the first stage of the control system design, a top-down analysis is used to analyze degrees of freedom, define an operational objective, identify important disturbances and operational/environmental constraints, and select the control variables. With the degrees of freedom, the process is optimized with relation to the operational objective at nominal operation as well as under the disturbances identified. Operational and environmental constraints active at all operations are chosen as control variables. From the results of the optimization studies, self-optimizing control variables are identified for further examination. Several methods are explored in this work for the selection of these self-optimizing control variables. Modifications made to the existing methods will be discussed in this presentation. Due to the very large number of candidate sets available for control variables and due to the complexity of the underlying optimization problem, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. The second stage is a bottom-up design of the control layers used for the operation of the process. First, the regulatory control layer is designed followed by the supervisory control layer. Finally, an optimization layer is designed. In this paper, the proposed two-stage control system design approach is applied to the AGR unit for an IGCC power plant with CO{sub 2} capture. Aspen Plus Dynamics® is used to develop the dynamic AGR process model while MATLAB is used to perform the control system design and for implementation of model predictive control (MPC).

Jones, D.; Bhattacharyya, D.; Turton, R.; Zitney, S.

2012-01-01T23:59:59.000Z

96

Radiant vessel auxiliary cooling system  

DOE Patents (OSTI)

In a modular liquid-metal pool breeder reactor, a radiant vessel auxiliary cooling system is disclosed for removing the residual heat resulting from the shutdown of a reactor by a completely passive heat transfer system. A shell surrounds the reactor and containment vessel, separated from the containment vessel by an air passage. Natural circulation of air is provided by air vents at the lower and upper ends of the shell. Longitudinal, radial and inwardly extending fins extend from the shell into the air passage. The fins are heated by radiation from the containment vessel and convect the heat to the circulating air. Residual heat from the primary reactor vessel is transmitted from the reactor vessel through an inert gas plenum to a guard or containment vessel designed to contain any leaking coolant. The containment vessel is conventional and is surrounded by the shell.

Germer, John H. (San Jose, CA)

1987-01-01T23:59:59.000Z

97

High voltage bus and auxiliary heater control system for an electric or hybrid vehicle  

DOE Patents (OSTI)

A control system for an electric or hybrid electric vehicle includes a vehicle system controller and a control circuit having an electric immersion heater. The heater is electrically connected to the vehicle's high voltage bus and is thermally coupled to a coolant loop containing a heater core for the vehicle's climate control system. The system controller responds to cabin heat requests from the climate control system by generating a pulse width modulated signal that is used by the control circuit to operate the heater at a duty cycle appropriate for the amount of cabin heating requested. The control system also uses the heater to dissipate excess energy produced by an auxiliary power unit and to provide electric braking when regenerative braking is not desirable and manual braking is not necessary. The control system further utilizes the heater to provide a safe discharge of a bank of energy storage capacitors following disconnection of the battery or one of the high voltage connectors used to transmit high voltage operating power to the various vehicle systems. The control circuit includes a high voltage clamping circuit that monitors the voltage on the bus and operates the heater to clamp down the bus voltage when it exceeds a pre-selected maximum voltage. The control system can also be used to phase in operation of the heater when the bus voltage exceeds a lower threshold voltage and can be used to phase out the auxiliary power unit charging and regenerative braking when the battery becomes fully charged.

Murty, Balarama Vempaty (West Bloomfield, MI)

2000-01-01T23:59:59.000Z

98

and R.Weiss, Framework for power aware remote processing: Design and implementation of a dynamic power estimation unit  

E-Print Network (OSTI)

In this paper we present a “Framework for Power Aware Remote Processing ‘ ‘ to minimize the energy consumption of mobile devices transparently. The main difference to remote processing frameworks already published consists in a novel integrated dynamic Power Estimation Unit. This is an adaptive power consumption estimator, which estimates the energy consumption of sojiware and system components. Based on the estimated power consumption an intelligent power manager migrates software components from the mobile device to remote machines, thus reducing the energy consumption of the mobile device.

Gerald Kaefer; Josef Haid; Bemd Hofer; Gerhard Schall; Reinhold Weiss

2001-01-01T23:59:59.000Z

99

Cooling Tower Fan Motor Power Optimization Study  

Science Conference Proceedings (OSTI)

Cooling towers are in use at more than 200 major electric generating plants in the United States, representing approximately 800 units and a total of more than 210,000 MW. The auxiliary power consumed by cooling tower fan motors can significantly reduce the net power output of steam-cycle power plants. Cooling tower specifications are established by the economic and operational requirements of maximum unit load and the most demanding environmental conditions expected in the tower’s locale. Since power pl...

2011-11-16T23:59:59.000Z

100

NETL: News Release - Solid Oxide Fuel Cell Successfully Powers Truck Cab  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2009 9, 2009 Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in DOE-Sponsored Test DOE, Delphi, Peterbilt Join to Test Auxiliary Power Unit for Commercial Trucks Washington, DC -In a test sponsored by the U.S. Department of Energy (DOE), a Delphi auxiliary power unit employing a solid oxide fuel cell (SOFC) successfully operated the electrical system and air conditioning of a Peterbilt Model 386 truck under conditions simulating idling conditions for 10 hours. The device provides an alternative to running a truck's main diesel engine, or using a truck's batteries, to power auxiliary electrical loads during rest periods, thereby lowering emissions, reducing noise, and saving fuel. Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in DOE-Sponsored Test

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Mathematical model of steam generator feed system at power unit of nuclear plant  

Science Conference Proceedings (OSTI)

A mathematical model of a steam generator feed system at a power unit of a nuclear plant with variable values of transfer function coefficients is presented. The model is realized in the MATLAB/Simulink/Stateflow event-driven simulation.

E. M. Raskin; L. A. Denisova; V. P. Sinitsyn; Yu. V. Nesterov

2011-05-01T23:59:59.000Z

102

The future of nuclear power in the United States : economic and regulatory challenges  

E-Print Network (OSTI)

This paper examines the economic and regulatory challenges that must be faced by potential investors in new nuclear power plants in the United States. The historical development of the existing fleet of over 100 nuclear ...

Joskow, Paul L.

2006-01-01T23:59:59.000Z

103

Land-Use Requirements for Solar Power Plants in the United States  

NLE Websites -- All DOE Office Websites (Extended Search)

Land-Use Requirements for Solar Power Plants in the United States Sean Ong, Clinton Campbell, Paul Denholm, Robert Margolis, and Garvin Heath Technical Report NRELTP-6A20-56290...

104

DOE Releases Comprehensive Report on Offshore Wind Power in the United  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Releases Comprehensive Report on Offshore Wind Power in the DOE Releases Comprehensive Report on Offshore Wind Power in the United States DOE Releases Comprehensive Report on Offshore Wind Power in the United States October 7, 2010 - 12:00am Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu announced today the release of a report from the Department of Energy's National Renewable Energy Laboratory (NREL), which comprehensively analyzes the key factors impacting the deployment of offshore wind power in the U.S. The report, "Large-Scale Offshore Wind Power in the United States: Assessment of Opportunities and Barriers," includes a detailed assessment of the Nation's offshore wind resources and offshore wind industry, including future job growth potential. The report also analyzes the technology challenges,

105

DOE Releases Comprehensive Report on Offshore Wind Power in the United  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Report on Offshore Wind Power in the Comprehensive Report on Offshore Wind Power in the United States DOE Releases Comprehensive Report on Offshore Wind Power in the United States October 7, 2010 - 12:00am Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu announced today the release of a report from the Department of Energy's National Renewable Energy Laboratory (NREL), which comprehensively analyzes the key factors impacting the deployment of offshore wind power in the U.S. The report, "Large-Scale Offshore Wind Power in the United States: Assessment of Opportunities and Barriers," includes a detailed assessment of the Nation's offshore wind resources and offshore wind industry, including future job growth potential. The report also analyzes the technology challenges, economics, permitting procedures, and the potential risks and benefits of

106

Test of fusible insulation for a proposed isotope power unit  

SciTech Connect

In support of the Isotope Kilowatt Program, an evaluation test of the full-scale simulated thermoelectric power generation system was made. The test was run with 6.5 in. of fusible insulation around the heat block-shield to determine the system heat losses. A loss of 10% of full power was obtained with the system operation at a heat block-shield surface temperature of 1100 deg F and an argon pressure of 1.0 psig. A test was run to determine the thermal coupling between the heat block-shield and 12 heat pipes with 12 simulated thermoelectric generators. A heat pipe condenser temperature of 1040 deg F was obtained at a heat block-shield surface temperature of 1150 deg F at a total power input of 34 kW. A loss-of-coolant accident test was made to determine the maximum fuel capsule surface temperature reached during a meltdown of the fusible insulation. The meltdown results yielded a maximum fuel capsule surface temperature of 2175 deg F and an equilibrium temperature of 2070 deg F. (auth)

Lackey, M.E.

1974-04-01T23:59:59.000Z

107

Modeling of Electronically Commutated Motor Controlled Fan-powered Terminal Units  

E-Print Network (OSTI)

Empirical models of airflow and power consumption were developed for series and parallel variable air volume fan powered terminal units (FPTUs). An experimental setup and test procedure were developed to test the terminal units over typical operating ranges. The terminal units in this study used either an 8 in. (20.32 cm) or a 12 in. (30.48 cm) primary air inlet. All terminal units utilized electronically commutated motor (ECM) controllers. Data collected were compared against previous data collected for silicon controlled rectifier (SCR) units. Generalized models were developed for both series and parallel units, and compared against models developed for SCR units. In addition to the performance modeling, power factor and power quality data were also collected for each terminal unit. The power quality analysis included recording and analyzing harmonic distortion for current, voltage, and power up to the 25th harmonic. The total harmonic distortion (THD) was also recorded and presented. For the series terminal units, models were developed for fan airflow, fan power, and primary airflow. The models for fan airflow all had R2 values above 0.987. The models for fan power all had R2 values above 0.968. The models for primary airflow all had R2 values above 0.895. For the parallel terminal units, models were developed for leakage, fan airflow, fan power, and primary airflow. All of the leakage models had R2 values above 0.826. All of the fan airflow models had R2 values above 0.955. All of the fan power models had R2 values above 0.922. All of the primary airflow models had R2 values above 0.872. The real power THD was below 1.5 percent for both series and parallel FPTUs. The current THD ranged from 84 percent to 172 percent for series FPTUs and from 83 percent to 183 percent for parallel FPTUs. The voltage THD was below 1.4 percent for both series and parallel FPTUs. The performance models developed will help improve the accuracy of building energy simulation programs for heating, ventilation, and air conditioning (HVAC) systems utilizing ECM controlled FPTUs. Increasing the accuracy of these simulations will allow HVAC system designers to better optimize their designs for specific building types in a wide variety of climates.

Edmondson, Jacob Lee

2009-12-01T23:59:59.000Z

108

AEO2011: Electric Power Projections for EMM Region - United States | OpenEI  

Open Energy Info (EERE)

United States United States Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 95, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power projections United States Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - United States- Reference Case (xls, 260.9 KiB) Quality Metrics

109

Overview of commercialization of stationary fuel cell power plants in the United States  

DOE Green Energy (OSTI)

In this paper, DOE`s efforts to assist private sector organizations to develop and commercialize stationary fuel cell power plants in the United States are discussed. The paper also provides a snapshot of the status of stationary power fuel cell development occurring in the US, addressing all fuel cell types. This paper discusses general characteristics, system configurations, and status of test units and demonstration projects. The US DOE, Morgantown Energy Technology Center is the lead center for implementing DOE`s program for fuel cells for stationary power.

Hooie, D.T.; Williams, M.C.

1995-07-01T23:59:59.000Z

110

The Future Potential of Waver Power in the United States  

Science Conference Proceedings (OSTI)

The theoretical ocean wave energy resource potential exceeds 50% of the annual domestic energy demand of the United States, is located close to coastal population centers, and, although variable in nature, may be more consistent and predictable than some other renewable generation technologies. As a renewable electricity generation technology, ocean wave energy offers a low air pollutant option for diversifying the U.S. electricity generation portfolio. Furthermore, the output characteristics of these technologies may complement other renewable technologies. This study addresses the following: (1) The theoretical, technical and practical potential for electricity generation from wave energy (2) The present lifecycle cost profile (Capex, Opex, and Cost of Electricity) of wave energy conversion technology at a reference site in Northern California at different plant scales (3) Cost of electricity variations as a function of deployment site, considering technical, geo-spatial and and electric grid constraints (4) Technology cost reduction pathways (5) Cost reduction targets at which the technology will see significant deployment within US markets, explored through a series of deployment scenarios RE Vision Consulting, LLC (RE Vision), engaged in various analyses to establish current and future cost profiles for marine hydrokinetic (MHK) technologies, quantified the theoretical, technical and practical resource potential, performed electricity market assessments and developed deployment scenarios. RE Vision was supported in this effort by NREL analysts, who compiled resource information, performed analysis using the ReEDSa model to develop deployment scenarios, and developed a simplified assessment of the Alaska and Hawaii electricity markets.

Mirko Previsic; Jeff Epler; Maureen Hand; Donna Heimiller; Walter Short; Kelly Eurek

2012-09-20T23:59:59.000Z

111

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Build a Durable Market for Wind Power in the United States”Learning Curves for Wind Power. ” Energy Policy, 30: 1181-Annual Report on U.S. Wind Power Installation, Cost, and

Bolinger, Mark A

2009-01-01T23:59:59.000Z

112

A multidiscipline and multi-rate modeling framework for planar solid-oxide fuel cell based power-conditioning system for vehicular APU  

Science Conference Proceedings (OSTI)

We develop a numerical modeling framework for planar solid-oxide fuel cell (PSOFC) based vehicular auxiliary power unit (APU). The power-conditioning system (PCS) model comprises the comprehensive transient models of PSOFC, balance-of-plant and power-electronics ...

Sudip K. Mazumder; Sanjaya Pradhan; Joseph Hartvigsen; Diego Rancruel; Michael R. von Spakovsky; Moe Khaleel

2007-07-01T23:59:59.000Z

113

Yonghuang Therm Power Plant Units 1 and 2, Inchon, South Korea  

SciTech Connect

Because South Korea depends heavily on imported fuels, its government continues to encourage energy diversification. Today Korea has about 60,000 MW of installed capacity that is fueled equally by coal, liquefied natural gas, and nuclear fission. Although the linchpins of the ongoing diversification program are more nukes and more plants powered by imported LNG, another piece of the plan is to make greater use of the country's domestic coal supplies. That is where Korea South-East Power Co. enters the picture, with two new supercritical units that showcase the technology's 40% efficiency. The plant has two 800-MW units and two identical units are under construction at the site. The plant has two-stage combustion and low NOx burners followed by selective catalytic reduction on each unit. SOx emissions are under 45 ppm. An integrated control and monitoring system helps keep down operating costs. 5 figs., 2 tabs.

Peltier, R.

2005-08-01T23:59:59.000Z

114

A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Roadmap to Deploy New Nuclear Power Plants in the United States A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume II, Main Report A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume II, Main Report The objective of this document is to provide the Department of Energy (DOE) and the nuclear industry with the basis for a plan to ensure the availability of near-term nuclear energy options that can be in operation in the U.S. by 2010. This document identifies the technological, regulatory, and institutional gaps and issues that need to be addressed for new nuclear plants to be deployed in the U.S. in this timeframe. It also identifies specific designs that could be deployed by 2010, along with the actions and resource requirements that are needed to ensure their

115

A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Roadmap to Deploy New Nuclear Power Plants in the United States A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume II, Main Report A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume II, Main Report The objective of this document is to provide the Department of Energy (DOE) and the nuclear industry with the basis for a plan to ensure the availability of near-term nuclear energy options that can be in operation in the U.S. by 2010. This document identifies the technological, regulatory, and institutional gaps and issues that need to be addressed for new nuclear plants to be deployed in the U.S. in this timeframe. It also identifies specific designs that could be deployed by 2010, along with the actions and resource requirements that are needed to ensure their

116

Grid Impacts of Wind Power: A Summary of Recent Studies in the United States; Preprint  

DOE Green Energy (OSTI)

Several detailed technical investigations of grid ancillary service impacts of wind power plants in the United States have recently been performed. These studies were applied to Xcel Energy (in Minnesota) and PacifiCorp and the Bonneville Power Administration (both in the northwestern United States). Although the approaches vary, three utility time frames appear to be most at issue: regulation, load following, and unit commitment. This paper describes and compares the analytic frameworks from recent analysis and discusses the implications and cost estimates of wind integration. The findings of these studies indicate that relatively large-scale wind generation will have an impact on power system operation and costs, but these impacts and costs are relatively low at penetration rates that are expected over the next several years.

Parsons, B.; Milligan, M.; Zavadil, B.; Brooks, D.; Kirby, B.; Dragoon, K.; Caldwell, J.

2003-06-01T23:59:59.000Z

117

Tri-State Generation and Transmission Association's Springverville unit 3 earns POWER's highest honor  

Science Conference Proceedings (OSTI)

It is said that pioneers take the arrows. In the case of Springerville Unit 3 - a 418 MW(net) expansion of a Tucson Electric Power facility in Arizona and the first pulverized coal-fired units built in the US in more than decade, the arrows were many. Although Tri-State (the developer), Tuscon Electric (the host), and Bechtel Power (the EPC contractor) were wounded by delayed deliveries of major equipment, bankruptcy of a major supplier, and a labor shortage, the companies showed their pioneering spirit and completed the project ahead of schedule. For ushering in a new generation of clean and desperately needed baseload capacity, Springerville Unit 3 is POWER magazine's 2006 Plant of the Year. 9 figs.

Peltier, R.

2006-09-15T23:59:59.000Z

118

A Reliability Improvement Program Planning Report for the SNAP 10A Space Nuclear Power Unit  

SciTech Connect

The estimated achieved reliability of SNAP 10A space nuclear power units will be relatively low at the timeof the first SNAPSHOT flight test in April 1963 and the existing R&D program does not provide a significant reliabiity growth thereafter. The total costs of an 8-satellite network using SNAP 10A units over a 5-year period has been approximated for the case where the total cost of a single satellite launched is 8 million dollars.

Coombs, M.G.; Smith C.K.; Wilson, L.A.

1961-03-14T23:59:59.000Z

119

Inventory of power plants in the United States as of January 1, 1996  

DOE Green Energy (OSTI)

The Inventory of Power Plants in the United States provides annual statistics on generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of January 1, 1996. The publication also provides a 10-year outlook for generating unit additions. This report is prepared annually by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy (DOE). Data summarized in this report are useful to a wide audience including Congress; Federal and State agencies; the electric utility industry; and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 as amended.

NONE

1996-12-01T23:59:59.000Z

120

Inventory of power plants in the United States as of January 1, 1997  

Science Conference Proceedings (OSTI)

The Inventory of Power Plants in the United States provides annual statistics on generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of January 1, 1997. The publication also provides a 10-yr outlook for generating unit additions. This report is prepared annually by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy (DOE). Data summarized in this report are useful to a wide audience including Congress; Federal and State agencies; the electric utility industry; and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

NONE

1997-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Inventory of power plants in the United States as of January 1, 1998  

Science Conference Proceedings (OSTI)

The Inventory of Power Plants in the United States provides annual statistics on generating units operated by electric utilities in the US (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of January 1, 1998. The publication also provides a 10-year outlook for generating unit additions and generating unit changes. This report is prepared annually by the Energy Information Administration (EIA). Data summarized in this report are useful to a wide audience. This is a report of electric utility data; in cases where summary data or nonconfidential data of nonutilities are presented, it is specifically noted as nonutility data. 19 figs., 36 tabs.

NONE

1998-12-01T23:59:59.000Z

122

Inventory of power plants in the United States 1989. [Contains glossary  

SciTech Connect

This document is prepared annually by the Electric Power Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), US Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units in operation and to provide a 10-year outlook of future generating unit additions by electric utilities in the United States (the 50 states and the District of Columbia). Data summarized in this report are useful to a wide audience including Congress, federal and state agencies, the electric utility industry, and the general public. The data presented in this report were assembled and published by the EIA, to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The report is organized into the following chapters: Summary Statistics; Operable Electric Generating Units; and Projected Electric Generating Unit Additions.

Not Available

1990-09-21T23:59:59.000Z

123

Modeling of ECM Controlled Series Fan-powered VAV Terminal Units  

E-Print Network (OSTI)

Semi-empirical models for series fan-powered variable air volume terminal units (FPTUs) were developed based on models of the primary, plenum, fan airflow and the fan power consumption. The experimental setups and test procedures were developed respectively for primary, plenum and fan airflow to test each component of the FPTUs at typical design pressures and airflows. Two sizes of the terminal units from three manufacturers were used in this study. All of the FPTUs were equipped with electronically commutated motors (ECM). Data provided by the models were compared against the data from previous experiments to prove the models’ validity. Regression modeling was performed by using SigmaStat. The model of primary airflow had an R2 above 0.948 for all the terminal units evaluated while the plenum airflow model had an R2 above 0.99. For all the terminal units, the R2 of the fan airflow model was ranged from 0.973 to 0.998. Except for one fan, the fan power consumption model was able to characterize the power performance and had an R2 above 0.986. By combining the airflow and power models, the model for series FPTU was developed. Verification was made to prove the FPTU model’s validity by comparing the measured and predicted data of airflow and power consumption. Correction factors were used in the primary airflow model to compensate for the difference caused by large measurement errors and the system effects. The predicted values were consistent with measurements and no offset was needed in the primary airflow model. Generally, the newly established model was able to describe the airflow performance as well as power consumption of series FPTUs without adding complexity.

Yin, Peng

2010-08-01T23:59:59.000Z

124

Review of the Current Status of Power Market Reforms in the United States and Europe  

Science Conference Proceedings (OSTI)

The Kyushu Electric Power Company (Kyushu EPCO) requested a survey of the design and performance of electricity markets in six regions in the United States and Europe. This report provides such an evaluation, making recommendations for continued liberalization in the areas of market design and market monitoring.

2002-11-04T23:59:59.000Z

125

Cooperation of heat pump and solar system in the common power unit  

Science Conference Proceedings (OSTI)

The paper explains new possibilities of heat pumps usage in the common power units. The result of applied research is an examination of heat pump and active solar system cooperation eligibility. The aspects of such a cooperation are examined mainly from ... Keywords: combined heating system, heat pump, heating factor, heating factor increase, natural energy, solar system

Mastny Petr

2007-05-01T23:59:59.000Z

126

Land-Use Requirements of Modern Wind Power Plants in the United States  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 August 2009 Land-Use Requirements of Modern Wind Power Plants in the United States Paul Denholm, Maureen Hand, Maddalena Jackson, and Sean Ong National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-6A2-45834 August 2009 Land-Use Requirements of Modern Wind Power Plants in the United States Paul Denholm, Maureen Hand, Maddalena Jackson, and Sean Ong Prepared under Task No. WER9.3550 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

127

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Build a Durable Market for Wind Power in the United States”Consult. 2008. “International Wind Energy Development: WorldGlobal Experience Curves for Wind Farms. ” Energy Policy,

Bolinger, Mark A

2009-01-01T23:59:59.000Z

128

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Curves for Wind Farms. ” Energy Policy, 33: 133-150. Lusey,Curves for Wind Power. ” Energy Policy, 30: 1181- IHS CERA.Wind Power Development in the United States” Energy Policy.

Bolinger, Mark A

2009-01-01T23:59:59.000Z

129

Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS  

NLE Websites -- All DOE Office Websites (Extended Search)

High Wind Power High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Technical Report NREL/TP-5500-52251 July 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 The Impact of High Wind Power Penetrations on Hydroelectric Unit Operations in the WWSIS Bri-Mathias Hodge, Debra Lew, and Michael Milligan Prepared under Task No. WE110810 Technical Report NREL/TP-5500-52251 July 2011 NOTICE

130

Green Power Marketing in the United States: A Status Report (2009 Data)  

NLE Websites -- All DOE Office Websites (Extended Search)

Green Power Marketing in the Green Power Marketing in the United States: A Status Report (2009 Data) Lori Bird and Jenny Sumner Technical Report NREL/TP-6A20-49403 September 2010 ERRATA SHEET NREL REPORT/PROJECT NUMBER: TP-6A20-49403 TITLE: Green Power Marketing in the United States: A Status Report (2009 Data) AUTHOR(S): Lori Bird, Jenny Sumner ORIGINAL PUBLICATION DATE: September 2010 DATE OF CORRECTIONS: April 2011 The following corrections were made to this report: On page 36, reference to 2010 vintage WECC wind was removed. In Table 18, data on 2010 vintage WECC wind was removed. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory

131

Unit commitment with wind power generation: integrating wind forecast uncertainty and stochastic programming.  

DOE Green Energy (OSTI)

We present a computational framework for integrating the state-of-the-art Weather Research and Forecasting (WRF) model in stochastic unit commitment/energy dispatch formulations that account for wind power uncertainty. We first enhance the WRF model with adjoint sensitivity analysis capabilities and a sampling technique implemented in a distributed-memory parallel computing architecture. We use these capabilities through an ensemble approach to model the uncertainty of the forecast errors. The wind power realizations are exploited through a closed-loop stochastic unit commitment/energy dispatch formulation. We discuss computational issues arising in the implementation of the framework. In addition, we validate the framework using real wind speed data obtained from a set of meteorological stations. We also build a simulated power system to demonstrate the developments.

Constantinescu, E. M.; Zavala, V. M.; Rocklin, M.; Lee, S.; Anitescu, M. (Mathematics and Computer Science); (Univ. of Chicago); (New York Univ.)

2009-10-09T23:59:59.000Z

132

AMERICAN ELECTRIC POWER'S CONESVILLE POWER PLANT UNIT NO.5 CO2 CAPTURE RETROFIT STUDY  

SciTech Connect

ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with American Electric Power (AEP), ABB Lummus Global Inc. (ABB), the US Department of Energy National Energy Technology Laboratory (DOE NETL), and the Ohio Coal Development Office (OCDO) to conduct a comprehensive study evaluating the technical feasibility and economics of alternate CO{sub 2} capture and sequestration technologies applied to an existing US coal-fired electric generation power plant. The motivation for this study was to provide input to potential US electric utility actions concerning GHG emissions reduction. If the US decides to reduce CO{sub 2} emissions, action would need to be taken to address existing power plants. Although fuel switching from coal to natural gas may be one scenario, it will not necessarily be a sufficient measure and some form of CO{sub 2} capture for use or disposal may also be required. The output of this CO{sub 2} capture study will enhance the public's understanding of control options and influence decisions and actions by government, regulators, and power plant owners in considering the costs of reducing greenhouse gas CO{sub 2} emissions. The total work breakdown structure is encompassed within three major reports, namely: (1) Literature Survey, (2) AEP's Conesville Unit No.5 Retrofit Study, and (3) Bench-Scale Testing and CFD Evaluation. The report on the literature survey results was issued earlier by Bozzuto, et al. (2000). Reports entitled ''AEP's Conesville Unit No.5 Retrofit Study'' and ''Bench-Scale Testing and CFD Evaluation'' are provided as companion volumes, denoted Volumes I and II, respectively, of the final report. The work performed, results obtained, and conclusions and recommendations derived therefrom are summarized.

Carl R. Bozzuto; Nsakala ya Nsakala; Gregory N. Liljedahl; Mark Palkes; John L. Marion

2001-06-30T23:59:59.000Z

133

Green Power Marketing in the United States: A Status Report (2008 Data)  

Science Conference Proceedings (OSTI)

Voluntary consumer decisions to buy electricity supplied from renewable energy sources represent a powerful market support mechanism for renewable energy development. In the early 1990s, a small number of U.S. utilities began offering 'green power' options to their customers. Since then, these products have become more prevalent, both from traditional utilities and from renewable energy marketers operating in states that have introduced competition into their retail electricity markets or offering renewable energy certificates (RECs) online. Today, more than half of all U.S. electricity customers have an option to purchase some type of green power product directly from a retail electricity provider, while all consumers have the option to purchase RECs. This report documents green power marketing activities and trends in the United States including utility green pricing programs offered in regulated electricity markets; green power marketing activity in competitive electricity markets, as well as green power sold to voluntary purchasers in the form of RECs; and renewable energy sold as greenhouse gas offsets in the United States. These sections are followed by a discussion of key market trends and issues. The final section offers conclusions and observations.

Bird, L.; Kreycik, C.; Friedman, B.

2009-09-01T23:59:59.000Z

134

Data processing unit and power system for the LANL REM instrument package. Final report  

SciTech Connect

The NEPSTP spacecraft needs highly reliable instrumentation to measure the nuclear reactor health and performance. These reactor measurements are essential for initial on-orbit phase operations and documentation of performance over time. Los Alamos National Laboratory (LANL), under the guidance of W. C. Feldman, principal investigator, has designed the Radiation Environment Monitoring (REM) package to meet these needs. The instrumentation package contains two neutron detectors, one gamma-ray detector, a data processing unit, and an instrument power system. The REM package is an integration of quick turn-around, state of the practice technology for detectors, data processors, and power systems. A significant portion of REM consists of subsystems with flight history. Southwest Research Institute (SwRI) has been tasked by LANL to design support electronics, including the Data Processing Unit (DPU) and Power System for REM. The goal for this project is to use technologies from current programs to speed up and simplify the design process. To meet these design goals, the authors use an open architecture VME bus for the DPU and derivatives of CASSINI power supplies for the instrument power system. To simplify integration and test activities, they incorporate a proven software development strategy and tool kits from outside vendors. The objective of this report is to illustrate easily incorporated system level designs for the DPU, power system and ground support electronics (GSE) in support of the important NEPSTP program.

Lockhart, W. [Southwest Research Inst., San Antonio, TX (United States). Instrumentation and Space Research Div.

1994-03-01T23:59:59.000Z

135

A computational framework for uncertainty quantification and stochastic optimization in unit commitment with wind power generation.  

Science Conference Proceedings (OSTI)

We present a computational framework for integrating a state-of-the-art numerical weather prediction (NWP) model in stochastic unit commitment/economic dispatch formulations that account for wind power uncertainty. We first enhance the NWP model with an ensemble-based uncertainty quantification strategy implemented in a distributed-memory parallel computing architecture. We discuss computational issues arising in the implementation of the framework and validate the model using real wind-speed data obtained from a set of meteorological stations. We build a simulated power system to demonstrate the developments.

Constantinescu, E. M; Zavala, V. M.; Rocklin, M.; Lee, S.; Anitescu, M. (Mathematics and Computer Science); (Univ. of Chicago); (New York Univ.)

2011-02-01T23:59:59.000Z

136

Social Acceptance of Wind Power in the United States: Evaluating Stakeholder Perspectives (Poster)  

DOE Green Energy (OSTI)

As the wind industry strives to achieve 20% wind energy by 2030, maintaining high levels of social acceptance for wind energy will become increasingly important. Wind Powering America is currently researching stakeholder perspectives in the U.S. market and reviewing findings from wind energy projects around the world to better understand social acceptance barriers. Results from European studies show that acceptance varies widely depending on local community values. A preliminary survey shows similar results in the United States. Further research will be conducted to refine our understanding of key social acceptance barriers and evaluate the best ways to mitigate negative perspectives on wind power.

Tegen, S.; Lantz, E.

2009-05-01T23:59:59.000Z

137

Green Power Marketing in the United States: A Status Report (Ninth Edition)  

NLE Websites -- All DOE Office Websites (Extended Search)

of of Energy Office of Energy Efficiency & Renewable Energy National Renewable Energy Laboratory Innovation for Our Energy Future Green Power Marketing in the United States: A Status Report (Ninth Edition) Lori Bird and Blair Swezey Technical Report NREL/TP-640-40904 November 2006 NREL is operated by Midwest Research Institute â—Ź Battelle Contract No. DE-AC36-99-GO10337 Green Power Marketing in the United States: A Status Report (Ninth Edition) Lori Bird and Blair Swezey Prepared under Task No. ASG6.1003 Technical Report NREL/TP-640-40904 November 2006 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy

138

Making european-style community wind power development work in theUnited States  

DOE Green Energy (OSTI)

Once primarily a European phenomenon, community wind power development--defined here as one or more locally owned, utility-scale wind turbines interconnected on either the customer or utility side of the meter--is gaining a foothold in an increasing number of states throughout the United States. This article describes the various policies and incentives that Minnesota, Wisconsin, Iowa, and Massachusetts are using to support community wind power development, and how state and federal support influences the types of projects and ownership structures that are being developed. Experience in these states demonstrates that, with an array of incentives and creative financing schemes targeted at community-scale projects, there are opportunities to make community wind work in the United States.

Bolinger, Mark A.

2004-04-26T23:59:59.000Z

139

Chilled Ammonia Process Development Unit at We Energies Pleasant Prairie Power Plant  

Science Conference Proceedings (OSTI)

Alstom Power, Inc. (Alstom) has developed a patented process technology referred to as the chilled ammonia process (CAP) for the capture and concentration of carbon dioxide from combustion flue gas. The technology involves the use of a chilled, concentrated ammonia solution to chemically bind the carbon dioxide, followed by a thermal decomposition step to liberate the carbon dioxide for collection and further use. This report documents results from the process development unit (PDU) testing of the CAP at...

2011-01-24T23:59:59.000Z

140

Green Power Marketing in the United States: A Status Report ; Fifth Edition  

NLE Websites -- All DOE Office Websites (Extended Search)

in the in the United States: A Status Report Fifth Edition August 2000 * NREL/TP-620-28738 Blair Swezey and Lori Bird National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 August 2000 * NREL/TP-620-28738 Green Power Marketing in the United States: A Status Report Fifth Edition Blair Swezey and Lori Bird Prepared under Task No. AS65.3010 NOTICE This report was prepared as an account of work sponsored by an agency of the United States

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Green Power Marketing in the United States: A Status Report (Eighth Edition)  

SciTech Connect

Voluntary consumer decisions to purchase electricity supplied by renewable energy sources represent a powerful market support mechanism for renewable energy development. Beginning in the early 1990s, a small number of U.S. utilities began offering "green power" options to their customers. Since then, these products have become more prevalent, both from utilities and in states that have introduced competition into their retail electricity markets. Today, more than 50% of all U.S. consumers have an option to purchase some type of green power product from a retail electricity provider. This report provides an overview of green power marketing activity in the United States. The first section provides an overview of green power markets, consumer response, and recent industry trends. The second section provides brief descriptions of utility green pricing programs. The third section describes companies that actively market green power in competitive markets and those that market renewable energy certificates nationally or regionally. The final section provides information on a select number of large, nonresidential green power purchasers, including businesses, universities, and government agencies.

Bird, L.; Swezey, B.

2005-10-01T23:59:59.000Z

142

THE SNAP-II POWER CONVERSION SYSTEM. TOPICAL REPORT NO. 4. TURBINE DESIGN AND TESTING  

SciTech Connect

SNAP II is the designation for a 3 kw nuclear auxiliary power unit to be used in a satellite vehicle. The SNAP II system consist of a reactor heat source, a mercury Rankine engine, and an alternator. A two stage, full admission, axial flow turbine was chosen for this APU application. Design details and test results are presented. (auth).

Poulos, E.N.; Furman, E.R.

1960-01-18T23:59:59.000Z

143

15 KJ FLASH LAMP, POWER CONDITIONING UNIT DESIGNED FOR SAFTY, RELIABILITY & MANUFACTURABILITY*  

SciTech Connect

A 15kJoule, Flash Lamp Power Conditioning Unit has been successfully designed, developed, and deployed in the National Ignition Facility (NIF) Preamplifier Modules (PAM). The primary design philosophy of this power conditioning unit (PCU) is safety, reliability, and manufacturability. Cost reduction over commercially equivalent systems was also achieved through an easily manufactured packaging design optimized to meet NIF requirements. While still maintaining low cost, the PCU design includes a robust control system, fault diagnostic system, and safety features. The pulsed power design includes 6 PFN modules, each including a dual series injection trigger transformer, that drive a total of 12 flash lamp loads. The lamps are individually triggered via a 20kV pulse produced by a 1kV, MCT switched capacitive discharge unit on the primary side of the trigger transformer. The remote control interface includes an embedded controller that captures flash lamp current wave forms and fault status for each shot. The embedded controller provides the flexibility of remotely adjusting both the main drive voltage from 1.6 to 2.5 kV and the trigger voltage from 0 to 20 kV.

James, G; Merritt, B; Dreifuerst, G; Strickland, S

2007-08-07T23:59:59.000Z

144

Nuclear Maintenance Application Center: Development and Analysis of an Open Phase Detection Scheme for Various Configurations of Auxiliary Transformers  

Science Conference Proceedings (OSTI)

Two recent failures have highlighted the need to detect open-phase conditions that can occur in the power delivery system. The analysis described in this report was performed to determine the response of system auxiliary transformers during open-phase conditions to aid in the development of system protection schemes to detect such conditions.BackgroundIn January 2012, an auxiliary component tripped due to a bus under-voltage. The cause of the event was the ...

2013-05-10T23:59:59.000Z

145

Geothermal power plants of the United States: a technical survey of existing and planned installations  

DOE Green Energy (OSTI)

The development of geothermal energy as a source of electric power in the United States is reviewed. A thorough description is given of The Geysers geothermal power project in northern California. The recent efforts to exploit the hot-water resources of the Mexicali-Imperial Rift Valley are described. Details are given concerning the geology of the several sites now being used and for those at which power plants will soon be built. Attention is paid to the technical particulars of all existing plants, including wells, gathering systems, energy conversion devices, materials, environmental impacts, economics and operating characteristics. Specifically, plants which either exist or are planned for the following locations are covered: The Geysers, CA; East Mesa, CA; Heber, CA; Roosevelt Hot Springs, UT; Valles Caldera, NM; Salton Sea, CA; Westmorland, CA; Brawley, CA; Desert Peak, NV; and Raft River, ID. The growth of installed geothermal electric generating capacity is traced from the beginning in 1960 and is projected to 1984.

DiPippo, R.

1978-04-01T23:59:59.000Z

146

Green Power Marketing in the United States: A Status Report (Ninth Edition)  

SciTech Connect

Voluntary consumer decisions to purchase electricity supplied by renewable energy sources represent a powerful market support mechanism for renewable energy development. Beginning in the early 1990s, a small number of U.S. utilities began offering ''green power'' options to their customers. Since then, these products have become more prevalent, both from traditional utilities and from marketers operating in states that have introduced competition into their retail electricity markets. Today, more than half of all U.S. consumers have an option to purchase some type of green power product from a retail electricity provider. Currently, more than 600 utilities, or about 20% of utilities nationally, offer green power programs to customers. These programs allow customers to purchase some portion of their power supply as renewable energy--almost always at a higher price--or to contribute funds for the utility to invest in renewable energy development. The term ''green pricing'' is typically used to refer to these utility programs offered in regulated or noncompetitive electricity markets. This report documents green power marketing activities and trends in the United States.

Bird, L.; Swezey, B.

2006-11-01T23:59:59.000Z

147

Green Power Marketing in the United States: A Status Report (Ninth Edition)  

SciTech Connect

Voluntary consumer decisions to purchase electricity supplied by renewable energy sources represent a powerful market support mechanism for renewable energy development. Beginning in the early 1990s, a small number of U.S. utilities began offering ''green power'' options to their customers. Since then, these products have become more prevalent, both from traditional utilities and from marketers operating in states that have introduced competition into their retail electricity markets. Today, more than half of all U.S. consumers have an option to purchase some type of green power product from a retail electricity provider. Currently, more than 600 utilities, or about 20% of utilities nationally, offer green power programs to customers. These programs allow customers to purchase some portion of their power supply as renewable energy--almost always at a higher price--or to contribute funds for the utility to invest in renewable energy development. The term ''green pricing'' is typically used to refer to these utility programs offered in regulated or noncompetitive electricity markets. This report documents green power marketing activities and trends in the United States.

Bird, L.; Swezey, B.

2006-11-01T23:59:59.000Z

148

Reducing water freshwater consumption at coal-fired power plants : approaches used outside the United States.  

Science Conference Proceedings (OSTI)

Coal-fired power plants consume huge quantities of water, and in some water-stressed areas, power plants compete with other users for limited supplies. Extensive use of coal to generate electricity is projected to continue for many years. Faced with increasing power demands and questionable future supplies, industries and governments are seeking ways to reduce freshwater consumption at coal-fired power plants. As the United States investigates various freshwater savings approaches (e.g., the use of alternative water sources), other countries are also researching and implementing approaches to address similar - and in many cases, more challenging - water supply and demand issues. Information about these non-U.S. approaches can be used to help direct near- and mid-term water-consumption research and development (R&D) activities in the United States. This report summarizes the research, development, and deployment (RD&D) status of several approaches used for reducing freshwater consumption by coal-fired power plants in other countries, many of which could be applied, or applied more aggressively, at coal-fired power plants in the United States. Information contained in this report is derived from literature and Internet searches, in some cases supplemented by communication with the researchers, authors, or equipment providers. Because there are few technical, peer-reviewed articles on this topic, much of the information in this report comes from the trade press and other non-peer-reviewed references. Reducing freshwater consumption at coal-fired power plants can occur directly or indirectly. Direct approaches are aimed specifically at reducing water consumption, and they include dry cooling, dry bottom ash handling, low-water-consuming emissions-control technologies, water metering and monitoring, reclaiming water from in-plant operations (e.g., recovery of cooling tower water for boiler makeup water, reclaiming water from flue gas desulfurization [FGD] systems), and desalination. Some of the direct approaches, such as dry air cooling, desalination, and recovery of cooling tower water for boiler makeup water, are costly and are deployed primarily in countries with severe water shortages, such as China, Australia, and South Africa. Table 1 shows drivers and approaches for reducing freshwater consumption in several countries outside the United States. Indirect approaches reduce water consumption while meeting other objectives, such as improving plant efficiency. Plants with higher efficiencies use less energy to produce electricity, and because the greater the energy production, the greater the cooling water needs, increased efficiency will help reduce water consumption. Approaches for improving efficiency (and for indirectly reducing water consumption) include increasing the operating steam parameters (temperature and pressure); using more efficient coal-fired technologies such as cogeneration, IGCC, and direct firing of gas turbines with coal; replacing or retrofitting existing inefficient plants to make them more efficient; installing high-performance monitoring and process controls; and coal drying. The motivations for increasing power plant efficiency outside the United States (and indirectly reducing water consumption) include the following: (1) countries that agreed to reduce carbon emissions (by ratifying the Kyoto protocol) find that one of the most effective ways to do so is to improve plant efficiency; (2) countries that import fuel (e.g., Japan) need highly efficient plants to compensate for higher coal costs; (3) countries with particularly large and growing energy demands, such as China and India, need large, efficient plants; (4) countries with large supplies of low-rank coals, such as Germany, need efficient processes to use such low-energy coals. Some countries have policies that encourage or mandate reduced water consumption - either directly or indirectly. For example, the European Union encourages increased efficiency through its cogeneration directive, which requires member states to assess their

Elcock, D. (Environmental Science Division)

2011-05-09T23:59:59.000Z

149

Reducing water freshwater consumption at coal-fired power plants : approaches used outside the United States.  

SciTech Connect

Coal-fired power plants consume huge quantities of water, and in some water-stressed areas, power plants compete with other users for limited supplies. Extensive use of coal to generate electricity is projected to continue for many years. Faced with increasing power demands and questionable future supplies, industries and governments are seeking ways to reduce freshwater consumption at coal-fired power plants. As the United States investigates various freshwater savings approaches (e.g., the use of alternative water sources), other countries are also researching and implementing approaches to address similar - and in many cases, more challenging - water supply and demand issues. Information about these non-U.S. approaches can be used to help direct near- and mid-term water-consumption research and development (R&D) activities in the United States. This report summarizes the research, development, and deployment (RD&D) status of several approaches used for reducing freshwater consumption by coal-fired power plants in other countries, many of which could be applied, or applied more aggressively, at coal-fired power plants in the United States. Information contained in this report is derived from literature and Internet searches, in some cases supplemented by communication with the researchers, authors, or equipment providers. Because there are few technical, peer-reviewed articles on this topic, much of the information in this report comes from the trade press and other non-peer-reviewed references. Reducing freshwater consumption at coal-fired power plants can occur directly or indirectly. Direct approaches are aimed specifically at reducing water consumption, and they include dry cooling, dry bottom ash handling, low-water-consuming emissions-control technologies, water metering and monitoring, reclaiming water from in-plant operations (e.g., recovery of cooling tower water for boiler makeup water, reclaiming water from flue gas desulfurization [FGD] systems), and desalination. Some of the direct approaches, such as dry air cooling, desalination, and recovery of cooling tower water for boiler makeup water, are costly and are deployed primarily in countries with severe water shortages, such as China, Australia, and South Africa. Table 1 shows drivers and approaches for reducing freshwater consumption in several countries outside the United States. Indirect approaches reduce water consumption while meeting other objectives, such as improving plant efficiency. Plants with higher efficiencies use less energy to produce electricity, and because the greater the energy production, the greater the cooling water needs, increased efficiency will help reduce water consumption. Approaches for improving efficiency (and for indirectly reducing water consumption) include increasing the operating steam parameters (temperature and pressure); using more efficient coal-fired technologies such as cogeneration, IGCC, and direct firing of gas turbines with coal; replacing or retrofitting existing inefficient plants to make them more efficient; installing high-performance monitoring and process controls; and coal drying. The motivations for increasing power plant efficiency outside the United States (and indirectly reducing water consumption) include the following: (1) countries that agreed to reduce carbon emissions (by ratifying the Kyoto protocol) find that one of the most effective ways to do so is to improve plant efficiency; (2) countries that import fuel (e.g., Japan) need highly efficient plants to compensate for higher coal costs; (3) countries with particularly large and growing energy demands, such as China and India, need large, efficient plants; (4) countries with large supplies of low-rank coals, such as Germany, need efficient processes to use such low-energy coals. Some countries have policies that encourage or mandate reduced water consumption - either directly or indirectly. For example, the European Union encourages increased efficiency through its cogeneration directive, which requires member states to assess their

Elcock, D. (Environmental Science Division)

2011-05-09T23:59:59.000Z

150

Job Creation Due to Nuclear Power Resurgence in The United States  

Science Conference Proceedings (OSTI)

The recent revival of global interest in the next generation of nuclear power reactors is causing a reexamination of the role of nuclear power in the United States. This renewed interest has led to questions regarding the capability and capacity of current U.S. industries to support a renewal of nuclear power plant deployment. Key among the many questions currently being asked is what potential exists for the creation of new jobs as a result of developing and operating these new plants? Idaho National Laboratory and Bechtel Power Corporation collaborated to perform a Department of Energy-sponsored study that evaluated the potential for job creation in the U.S. should these new next generation nuclear power plants be built. The study focused primarily on providing an initial estimate of the numbers of new manufacturing jobs that could be created, including those that could be repatriated from overseas, resulting from the construction of these new reactors. In addition to the growth in the manufacturing sector, the study attempted to estimate the potential increase in construction trades necessary to accomplish the new construction.

C. R. Kenley; R. D. Klingler; C. M. Plowman; R. Soto; R. J. Turk; R. L. Baker; S. A. Close; V. L. McDonnell; S. W. Paul; L. R. Rabideau; S. S. Rao; B. P. Reilly

2009-11-01T23:59:59.000Z

151

Use of GTE-65 gas turbine power units in the thermal configuration of steam-gas systems for the refitting of operating thermal electric power plants  

SciTech Connect

Thermal configurations for condensation, district heating, and discharge steam-gas systems (PGU) based on the GTE-65 gas turbine power unit are described. A comparative multivariant analysis of their thermodynamic efficiency is made. Based on some representative examples, it is shown that steam-gas systems with the GTE-65 and boiler-utilizer units can be effectively used and installed in existing main buildings during technical refitting of operating thermal electric power plants.

Lebedev, A. S.; Kovalevskii, V. P. ['Leningradskii Metallicheskii Zavod', branch of JSC 'Silovye mashiny' (Russian Federation); Getmanov, E. A.; Ermaikina, N. A. ['Institut Teploenergoproekt', branch of JSC 'Inzhenernyi tsentr EES' (Russian Federation)

2008-07-15T23:59:59.000Z

152

Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report  

Science Conference Proceedings (OSTI)

This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

NONE

1994-06-01T23:59:59.000Z

153

Small power systems study technical summary report. Volume II. Inventory of small generating units in U. S. utility systems  

SciTech Connect

Data identifying small (less than or equal to 10 MW) power units in the United States are tabulated. The data are listed alphabetically by state and are reported sequentially for investor owned utilities, municipal utilities, and electrical cooperatives and other utility systems. For a given utility system, the generating units are divided into steam turbines, diesel generators and gas turbines. The number and size of generating units are listed. A summary tabulation of the number of generating units of each type and total generating capacity by state is presented.

Sitney, L.R.

1978-05-31T23:59:59.000Z

154

European legislation in the United Kingdom: a threat to coal-fired power station product utilization?  

SciTech Connect

The author considers that the European Union has not taken the approach adopted in the USA where environmental regulators are keen to promote the use of coal-fired power station ash by-product and recycled materials. The United Kingdom has seen, with some dismay, the effects EU legislation is having on the ash industry. This article outlines only some of the problems being tackled. The Waste Framework Directive is difficult to interpret and fails to define critical aspects of the problem. This directive is discussed at some length in the article. A total of nine directives effect the operation of coal-fired power plant. Many are imprecise and open to interpretation and cause a deal of frustration, delays and confusion to the ash supplier and contractor. This is causing markets to suffer.

Sear, K.A. [Quality Ash Association (United Kingdom)

2006-07-01T23:59:59.000Z

155

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Wind Power Capacity Incremental Capacity (2007, MW) United States China Spain Germany IndiaWind Generation as % of Electricity Consumption Austria Germany Denmark Australia Canada Norway Indiaand India (BTM Consult, 2008). With major development now occurring on several continents, wind

Bolinger, Mark A

2009-01-01T23:59:59.000Z

156

Heat exchanger with auxiliary cooling system  

DOE Patents (OSTI)

A heat exchanger with an auxiliary cooling system capable of cooling a nuclear reactor should the normal cooling mechanism become inoperable. A cooling coil is disposed around vertical heat transfer tubes that carry secondary coolant therethrough and is located in a downward flow of primary coolant that passes in heat transfer relationship with both the cooling coil and the vertical heat transfer tubes. A third coolant is pumped through the cooling coil which absorbs heat from the primary coolant which increases the downward flow of the primary coolant thereby increasing the natural circulation of the primary coolant through the nuclear reactor.

Coleman, John H. (Salem Township, Westmoreland County, PA)

1980-01-01T23:59:59.000Z

157

Wind/hybrid power system test facilities in the United States and Canada  

SciTech Connect

By 1995, there will be four facilities available for testing of wind/hybrid power systems in the United States and Canada. This paper describes the mission, approach, capabilities, and status of activity at each of these facilities. These facilities have in common a focus on power systems for remote, off-grid locations that include wind energy. At the same time, these facilities have diverse, yet complimentary, missions that range from research to technology development to testing. The first facility is the test facility at the Institut de Recherche d`Hydro-Quebec (IREQ), Hydro-Quebec`s research institute near Montreal, Canada. This facility, not currently in operation, was used for initial experiments demonstrating the dynamic stability of a high penetration, no-storage wind/diesel (HPNSWD) concept. The second facility is located at the Atlantic Wind Test Site (AWTS) on Prince Edward Island, Canada, where testing of the HPNSWD concept developed by Hydro-Quebec is currently underway. The third is the Hybrid Power Test Facility planned for the National Wind Technology Center at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, which will focus on testing commercially available hybrid power systems. The fourth is the US Department of Agriculture (USDA) Conservation and Production Research Laboratory in Bushland, Texas, where a test laboratory is being developed to study wind-energy penetration and control strategies for wind/hybrid systems. The authors recognize that this summary of test facilities is not all inclusive; for example, at least one US industrial facility is currently testing a hybrid power system. Our intent, though, is to describe four facilities owned by nonprofit or governmental institutions in North America that are or will be available for ongoing development of wind/hybrid power systems.

Green, H J [National Renewable Energy Lab., Golden, CO (United States); Clark, R N [USDA Conservation and Production Research Laboratory, Bushland, TX (United States); Brothers, C [Atlantic Wind Test Site, North Cape, PE (Canada); Saulnier, B [Institut de Recherche d`Hydro-Quebec, Varennes, PQ (Canada)

1994-05-01T23:59:59.000Z

158

Efforts to Reduce the Impacts of Hydroelectric Power Production on Reservoir Fisheries in the United States.  

DOE Green Energy (OSTI)

Research into the environmental effects of hydroelectric power production in the United States has focused increasingly on resident and migratory fish populations. Hydropower dams and reservoirs can block fish movements in both upstream and downstream directions. These movements are essential for important stocks of anadromous and catadromous fish. In addition, some strictly freshwater fish may move long distances within a river during their life cycle.A dam can pose an impassable barrier for fish trying to move upstream unless mitigation measures in the form of ladders or lifts are provided. Fish moving downstream to the sea may become disoriented when they encounter static water within a reservoir. Both resident and migratory fish may be injured or killed by passing through the turbine or over the spillway. In the United States, a variety of organizations conduct applied research and development of measures to (1) enhance fish passage, (2) reduce the numbers of fish that are drawn into the turbine intakes, and (3) reduce the injury and mortality rates of fish that pass through the turbines. Examples of these efforts from a variety of river systems and hydroelectric power plants are described.

Cada, G. F.

1997-09-08T23:59:59.000Z

159

Compressor and Turbine Models of Brayton Units for Space Nuclear Power Systems  

SciTech Connect

Closed Brayton Cycles with centrifugal flow, single-shaft turbo-machines are being considered, with gas cooled nuclear reactors, to provide 10's to 100's of electrical power to support future space exploration missions and Lunar and Mars outposts. Such power system analysis is typically based on the cycle thermodynamics, for given operating pressures and temperatures and assumed polytropic efficiencies of the compressor and turbine of the Brayton energy conversion units. Thus the analysis results not suitable for modeling operation transients such as startup and changes in the electric load. To simulate these transients, accurate models of the turbine and compressor in the Brayton rotating unit, which calculate the changes in the compressor and turbine efficiencies with system operation are needed. This paper presents flow models that account for the design and dimensions of the compressor impeller and diffuser, and the turbine stator and rotor blades. These models calculate the various enthalpy losses and the polytropic efficiencies along with the pressure ratios of the turbine and compressor. The predictions of these models compare well with reported performance data of actual hardware. In addition, the results of a parametric analysis to map the operations of the compressor and turbine, as functions of the rotating shaft speed and inlet Mach number of the gas working fluid, are presented and discussed. The analysis used a binary mixture of He-Xe with a molecular weight of 40 g/mole as the working fluid.

Gallo, Bruno M.; El-Genk, Mohamed S.; Tournier, Jean-Michel [Institute for Space and Nuclear Power Studies, University of New Mexico, Albuquerque, NM, 87131 (United States); Chemical and Nuclear Engineering Department, University of New Mexico, Albuquerque, NM, 87131 (United States)

2007-01-30T23:59:59.000Z

160

Combustion systems and power plants incorporating parallel carbon dioxide capture and sweep-based membrane separation units to remove carbon dioxide from combustion gases  

SciTech Connect

Disclosed herein are combustion systems and power plants that incorporate sweep-based membrane separation units to remove carbon dioxide from combustion gases. In its most basic embodiment, the invention is a combustion system that includes three discrete units: a combustion unit, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In a preferred embodiment, the invention is a power plant including a combustion unit, a power generation system, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In both of these embodiments, the carbon dioxide capture unit and the sweep-based membrane separation unit are configured to be operated in parallel, by which we mean that each unit is adapted to receive exhaust gases from the combustion unit without such gases first passing through the other unit.

Wijmans, Johannes G. (Menlo Park, CA); Merkel, Timothy C (Menlo Park, CA); Baker, Richard W. (Palo Alto, CA)

2011-10-11T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Optimization of renewable power system for small scale seawater reverse osmosis desalination unit in Mrair-Gabis village, Libya  

Science Conference Proceedings (OSTI)

Potential of renewable power system for small scale seawater reverse osmosis desalination unit in Mrair-Gabis village, Libya is evaluated. HOMER optimization model is used to evaluate the different possible configuration options for supplying the electrical ... Keywords: HOMER, Mrair-Gabis-Libya, power system, reverse osmosis seawater desalination

Kh. Abulqasem; M. A. Alghoul; M. N. Mohammed; Alshrif. Mustafa; Kh. Glaisa; Nowshad. Amin; A. Zaharim; K. Sopian

2011-07-01T23:59:59.000Z

162

Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994  

SciTech Connect

This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

NONE

1995-05-01T23:59:59.000Z

163

Tampa Electric Company Polk Power Station Unit Number 1. Annual report, January--December, 1993  

Science Conference Proceedings (OSTI)

This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year`s activities associated with Tampa Electric Company`s 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.

Not Available

1994-08-01T23:59:59.000Z

164

Land-Use Requirements for Solar Power Plants in the United States  

DOE Green Energy (OSTI)

This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

Ong, S.; Campbell, C.; Denholm, P.; Margolis, R.; Heath, G.

2013-06-01T23:59:59.000Z

165

Impacts from Deployment Barriers on the United States Wind Power Industry: Overview & Preliminary Findings (Presentation)  

DOE Green Energy (OSTI)

Regardless of cost and performance some wind projects are unable to proceed to commissioning as a result of deployment barriers. Principal deployment barriers in the industry today include: wildlife, public acceptance, access to transmission, and radar. To date, methods for understanding these non-technical barriers have failed to accurately characterize the costs imposed by deployment barriers and the degree of impact to the industry. Analytical challenges include limited data and modeling capabilities. Changes in policy and regulation, among other factors, also add complexity to analysis of impacts from deployment barriers. This presentation details preliminary results from new NREL analysis focused on quantifying the impact of deployment barriers on the wind resource of the United States, the installed cost of wind projects, and the total electric power system cost of a 20% wind energy future. In terms of impacts to wind project costs and developable land, preliminary findings suggest that deployment barriers are secondary to market drivers such as demand. Nevertheless, impacts to wind project costs are on the order of $100/kW and a substantial share of the potentially developable windy land in the United States is indeed affected by deployment barriers.

Lantz, E.; Tegen, S.; Hand, M.; Heimiller, D.

2012-09-01T23:59:59.000Z

166

THE SNAP-II POWER CONVERSION SYSTEM. DYNAMIC ANALYSIS. TOPICAL REPORT NO. 3  

SciTech Connect

SNAP II is the designation for a nuclear auxiliary power unit, designed primarily for utilization in the WS117L satellite vehicle. The SNAP II system consists of a reactor heat source, a mercury Rankin engin, and an alternator. Dynamic analysis of the power conversion system was conducted utilizing a comprehensive analog computer simulation. Feasibility of a parasitic load control for numerous system disturbances was demonstrated. (auth)

Deibel, D.L.; Mrava, G.L.; Seldner, K.

1960-01-15T23:59:59.000Z

167

SMALL POWER REACTOR PROJECTS OF THE UNITED STATES ATOMIC ENERGY COMMISSION  

SciTech Connect

Information on small power reactor projects of the USAEC is summarized. General information concerning the projects as a whole is given. Specific projects discussed include: the Elk River Power Reactor, the Piqua Nuclear Power Facility, the BONUS Power Reactor, the Pathfinder Power Reactor, the small-size pressurized water power reactor, and the experimental low-power process heat reactor. (M.C.G.)

1961-09-28T23:59:59.000Z

168

Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint  

DOE Green Energy (OSTI)

This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

Hodge, B. M.; Lew, D.; Milligan, M.

2011-10-01T23:59:59.000Z

169

Making european-style community wind power development work in the United States  

E-Print Network (OSTI)

Support for Community Wind Power Development. LBNL-54715.at 2003 Oklahoma Wind Power and Bioenergy Conference, JuneWind. 2001. Distributed Wind Power Assessment. Prepared for

Bolinger, Mark A.

2004-01-01T23:59:59.000Z

170

Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States  

E-Print Network (OSTI)

mechanisms to support wind power development." Renewablebe competitive with wind power and other forms of renewabletechnologies (e.g. , wind power). As a prime illustration of

Wiser, Ryan

2010-01-01T23:59:59.000Z

171

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

Andersen, P.D. 1998. Wind Power in Denmark: Technology,Inc. 1998. Distributed Wind Power Assessment. Draft reportwww.stem.se Swedish Wind Power Association. 2001. Current

Bolinger, Mark

2001-01-01T23:59:59.000Z

172

Lessons Learned: Designing Successful Green Power Services: Phase II - Assessment of Green Power Products and Services in the United States  

Science Conference Proceedings (OSTI)

"Green power" -- electricity produced from renewable resources -- has emerged as a key product in the restructuring of electricity markets around the world. Residential and commercial end-use customers have been able to purchase green-power products everywhere that retail competition is allowed, and the "greenness" of power products is universally recognized as a unique product differentiator in competitive markets. This report focuses on green-power marketing and green-power products in states where a c...

2002-04-11T23:59:59.000Z

173

Apparatus and methods for supplying auxiliary steam in a combined cycle system  

SciTech Connect

To provide auxiliary steam, a low pressure valve is opened in a combined cycle system to divert low pressure steam from the heat recovery steam generator to a header for supplying steam to a second combined cycle's steam turbine seals, sparging devices and cooling steam for the steam turbine if the steam turbine and gas turbine lie on a common shaft with the generator. Cooling steam is supplied the gas turbine in the combined cycle system from the high pressure steam turbine. Spent gas turbine cooling steam may augment the low pressure steam supplied to the header by opening a high pressure valve whereby high and low pressure steam flows are combined. An attemperator is used to reduce the temperature of the combined steam in response to auxiliary steam flows above a predetermined flow and a steam header temperature above a predetermined temperature. The auxiliary steam may be used to start additional combined cycle units or to provide a host unit with steam turbine cooling and sealing steam during full-speed no-load operation after a load rejection.

Gorman, William G. (Ballston Spa, NY); Carberg, William George (Ballston Spa, NY); Jones, Charles Michael (Ballston Lake, NY)

2002-01-01T23:59:59.000Z

174

Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in DOE-Sponsored Test Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in DOE-Sponsored Test March 19, 2009 - 1:00pm Addthis Washington, DC --In a test sponsored by the U.S. Department of Energy (DOE), a Delphi auxiliary power unit employing a solid oxide fuel cell (SOFC) successfully operated the electrical system and air conditioning of a Peterbilt Model 386 truck under conditions simulating idling conditions for 10 hours. The device provides an alternative to running a truck's main diesel engine, or using a truck's batteries, to power auxiliary electrical loads during rest periods, thereby lowering emissions, reducing noise, and saving fuel. In testing at Peterbilt Motors Company Texas head-quarters, a Delphi

175

A Survey of Water Use and Sustainability in the United States with a Focus on Power Generation  

Science Conference Proceedings (OSTI)

EPRI has identified water resource sustainability and its relation to electric power as one of the key challenges within EPRI's Electricity Technology Roadmap. This report presents an overview of present and future freshwater availability and generation demand for fresh water in the United States. The report takes a first step toward development of a comprehensive framework for evaluating possible impacts of water supply limitations on electric power generation and management approaches to limiting these...

2003-12-03T23:59:59.000Z

176

Analyzing auxiliary system in nuclear generating stations  

Science Conference Proceedings (OSTI)

The design for most nuclear generating stations took place before the widespread use of computerized engineering tools. The manual design basis calculations that were performed vary in quantity from only a few feet of shelf space for some of the first stations to bookcases full for stations that are now receiving their operating licenses. Some of the following issues may apply to the manual calculation files of any nuclear station: Errors and lack of detail in hand calculations; Calculations that may not document the required safety functions; Calculations that lag behind the as-built condition of the station; Documentation that does not add up to a coherent whole; and incomplete auditability and traceability of data. The increasing use of computerized tools in nuclear generating station analysis has helped address the hand-calculation problems. The use of a master system model to study various scenarios also ensures that uniform assumptions are being used for all related analyses. This article presents an overview of how computerized tools are being used for both ac and dc auxiliary system calculations. Problems that may be created by the use of these tools are discussed, along with a review of those issues specific to nuclear generating stations.

Jancauskas, J.R. (Gilber/Commonwealth (US))

1992-07-01T23:59:59.000Z

177

The Role of Batteries in Auxiliary Power for Heavy Trucks  

DOE Green Energy (OSTI)

The problem that this paper deals with is that Heavy trucks leave their engines on while they are stopped and the driver is sleeping, eating, etc.

D. Crouch

2001-12-12T23:59:59.000Z

178

MEASUREMENTS OF THE CONFINEMENT LEAKTIGHTNESS AT THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA  

Science Conference Proceedings (OSTI)

This is the final report on the INSP project entitled, ``Kola Confinement Leaktightness'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.1. This project was initiated in February 1993 to assist the Russians to reduce risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Units 1 and 2, through upgrades in the confinement performance to reduce the uncontrolled leakage rate. The major technical objective of this-project was to improve the leaktightness of the Kola NPP VVER confinement boundaries, through the application of a variety of sealants to penetrations, doors and hatches, seams and surfaces, to the extent that current technology permitted. A related objective was the transfer, through training of Russian staff, of the materials application procedures to the staff of the Kola NPP. This project was part of an overall approach to minimizing uncontrolled releases from the Kola NPP VVER440/230s in the event of a serious accident, and to thereby significantly mitigate the consequences of such an accident. The US provided materials, application technology, and applications equipment for application of sealant materials, surface coatings, potting materials and gaskets, to improve the confinement leaktightness of the Kola VVER-440/23Os. The US provided for training of Russian personnel in the applications technology.

GREENE,G.A.; GUPPY,J.G.

1998-08-01T23:59:59.000Z

179

EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4  

SciTech Connect

In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.

Bjornstad, David J [ORNL

2010-08-01T23:59:59.000Z

180

Figure 1. Current-sensing calibration circuit consisting of an auxiliary switch Qa and a precision sensing resistor Rs in parallel with a main  

E-Print Network (OSTI)

Using a power MOSFET with built-in current-sensing mirror ("SenseFet") CT Using a current transformer Qa and a precision sensing resistor Rs in parallel with a main power switch Q. The auxiliary switch-line Calibration of Lossless Current Sensing Yang Zhang, Regan Zane, Dragan Maksimovic Colorado Power Electronics

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States  

E-Print Network (OSTI)

L ABORATORY Supporting Solar Power in Renewables PortfolioLBNL- 3984E Supporting Solar Power in Renewables Portfolioof the concentrating solar power (CSP) market in the U.S.

Wiser, Ryan

2010-01-01T23:59:59.000Z

182

Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS  

DOE Green Energy (OSTI)

This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

Hodge, B.-M.; Lew, D.; Milligan, M.

2011-07-01T23:59:59.000Z

183

Auxiliary Signal Processing System for a Multiparameter Radar  

Science Conference Proceedings (OSTI)

The design of an auxiliary signal processor for a multiparameter radar is described with emphasis on low cost, quick development, and minimum disruption of radar operations. The processor is based around a low-cost digital signal processor card ...

V. Chandrasekar; G. R. Gray; I. J. Caylor

1993-06-01T23:59:59.000Z

184

Minimizing electricity costs with an auxiliary generator using stochastic programming  

E-Print Network (OSTI)

This thesis addresses the problem of minimizing a facility's electricity costs by generating optimal responses using an auxiliary generator as the parameter of the control systems. The-goal of the thesis is to find an ...

Rafiuly, Paul, 1976-

2000-01-01T23:59:59.000Z

185

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

the Nuclear Power Decommissioning Act, which gives thetrend towards nuclear decommissioning that has been driving

Bolinger, Mark

2001-01-01T23:59:59.000Z

186

Shutdown and low-power operation at commercial nuclear power plants in the United States. Final report  

Science Conference Proceedings (OSTI)

The report contains the results of the NRC Staff`s evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements.

Not Available

1993-09-01T23:59:59.000Z

187

WHO PAYS FOR WHAT? Facilities & Auxiliary Services  

E-Print Network (OSTI)

by everyone; and can be reasonably allocated on a per square foot basis. Most regular maintenance services scenarios, charges for paint and carpet will be at the cost of the requesting unit. 5 #12;FURNITURE REPAIRS

Cakoni, Fioralba

188

An examination of the pursuit of nuclear power plant construction projects in the United States  

E-Print Network (OSTI)

The recent serious reconsideration of nuclear power as a means for U.S. electric utilities to increase their generation capacity provokes many questions regarding the achievable success of future nuclear power plant ...

Guyer, Brittany (Brittany Leigh)

2011-01-01T23:59:59.000Z

189

Agent-based electrical power management model for houses equipped with storage battery and photovoltaic units  

Science Conference Proceedings (OSTI)

Smart grid systems have been actively discussed to realize a sustainable and a low-carbon society that efficiently consumes electric power and to introduce photovoltaic power generation, i.e., renewable energy or electric vehicles. In this study, we ...

Ryo Kanamori; Takayuki Ito; Nobuyasu Mizutani

2011-12-01T23:59:59.000Z

190

Nuclear power plant performance assessment pertaining to plant aging in France and the United States  

E-Print Network (OSTI)

The effect of aging on nuclear power plant performance has come under increased scrutiny in recent years. The approaches used to make an assessment of this effect strongly influence the economics of nuclear power plant ...

Guyer, Brittany (Brittany Leigh)

2013-01-01T23:59:59.000Z

191

Wind Power Development in the United States: Current Progress, Future Trends  

E-Print Network (OSTI)

to lower the cost of offshore wind power, and incrementallyinstalled offshore. From 2018 to 2030, roughly 16 GW of wind

Wiser, Ryan H

2009-01-01T23:59:59.000Z

192

Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States  

E-Print Network (OSTI)

power sales agreements. Duke Energy North Carolina SolarGeneration Program: Duke Energy plans to install 10 MW of

Wiser, Ryan

2010-01-01T23:59:59.000Z

193

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

is this trend towards nuclear decommissioning that has beenRiksdag passed the Nuclear Power Decommissioning Act, which

Bolinger, Mark

2001-01-01T23:59:59.000Z

194

Commercial Nuclear Electric Power in the United States: Problems and Prospects  

Reports and Publications (EIA)

This article briefly reviews the origins of commercial nuclear electric power, the efforts to dispose of high-level nuclear waste, the costs of building and operating nuclear electric power plants, and other energy-related developments pertinent to the future of nuclear electric power.

Information Center

1994-08-01T23:59:59.000Z

195

Technical evaluation of the adequacy of station electric-distribution-system voltages for the Pilgrim Nuclear Power Station, Unit 1  

Science Conference Proceedings (OSTI)

This report documents the technical evaluation of the adequacy of the station electric distribution system voltages for the Pilgrim Nuclear Power Station, Unit 1. The evaluation is to determine if the onsite distribution system in conjunction with the offsite power sources has sufficient capacity to automatically start and operate all Class 1E loads within the equipment voltage ratings under certain conditions established by the Nuclear Regulatory Commission. The analyses demonstrated that for the worst case conditions established, the Class 1E equipment will automatically start and continue to operate within the equiment design voltage rating.

Selan, J.C.

1981-12-28T23:59:59.000Z

196

Development of the severe accident management guidelines (SAMG) for Ulchin Nuclear Power Plant Unit 3, 4, 5 and 6  

SciTech Connect

This paper describes the development process of the severe accident management guidelines (SAMG) for Units 3, 4, 5 and 6 of Ulchin Nuclear Power Plant. The units are Korean Standard Nuclear Power (KSNP) plant, 1000 MWe class pressurized water reactor (PWR) with two loops of primary coolant system. The severe accident management guidelines for the units have been completed in 2002. The generic severe accident management guidance for Korean Standard Nuclear Power Plant has been used as the basis when developing Ulchin severe accident management guideline. Result of probabilistic safety assessment (PSA) for each unit was reviewed to integrate its insight into the SAMG. It indicates that each unit has a balanced design to any specific initiating events for core damage. Seven severe accident management strategies are applied in Ulchin SAMG. Seven strategies are (1) Inject into the steam generator (2) De-pressurize the RCS (3) Inject into the RCS (4) Inject into the containment (5) Control the fission product release into environment (6) Control the containment pressure and temperature and (7) Control hydrogen concentration in the containment. The range and capability of essential instrument for performing the strategies are assessed. Computational aids are developed to complement the unavailable instrument during the accident and to assist the operator's decision choosing strategies. To examine the ability of the SAMG to fulfill its intended function, small loss of coolant accident (SLOCA) with the failure of safety injection was selected as a reference scenario. The scenario was analyzed using MAAP code. The evaluation of the SAMG using this sequence has been successfully completed. (authors)

Kim, Hyeong T.; Yoo, Hojong; Lim, Hyuk Soon; Park, Jong W.; Lim, Woosang; Oh, Seung Jong [Korea Hydro and Nuclear Power Co., Ltd., 103-16 Munji-Dong, Yusung-Gu, Daejeon, 305-380 (Korea, Republic of); Chung, Chang Hyun [Seoul National University (Korea, Republic of); Lee, Byung Chul [Future and Challenges, Inc (Korea, Republic of)

2004-07-01T23:59:59.000Z

197

Robust Controller Design for Simultaneous Control of Throttle Pressure and Megawatt Output in a Power Plant Unit  

Science Conference Proceedings (OSTI)

Recently proposed (( and (-synthesis controller design methodologies permit the design of high-performance control systems for plants that are difficult to model accurately. The work summarized in this report assesses the benefits of the (( and (-synthesis controllers for the simultaneous control of throttle pressure and megawatt output in a power plant unit, while also serving to clarify the (( and (-synthesis design methods by an example.

1999-02-25T23:59:59.000Z

198

THE SNAP II POWER CONVERSION SYSTEM TOPICAL REPORT NO. 15. CRU DESIGN AND DEVELOPMENT  

SciTech Connect

SNAP II is the designation for a 3-kw nuclear auxiliary power untt to be used in a satellite vehicle. This system consists of a reactor heat source, a mercury Rankine engine and an alternator. The alternator, mercury pump, turbine, and reactor coolant pump are mounted on a common shaft supported by mercury lubricated bearings. Design details and test results concerning the combined rotating unit (CRU) development are described. (auth)

1961-07-01T23:59:59.000Z

199

Disparities in nuclear power plant performance in the United States and the Federal Republic of Germany  

E-Print Network (OSTI)

This report presents data comparing the performance of light water reactors in the United States and the Federal Republic of Germany (FRG). The comparisons are made for the years 1980-1983 and include 21 Westinghouse ...

Hansen, Kent F.

1984-01-01T23:59:59.000Z

200

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

an overview of commercial wind farm financing in the Unitedthe United States, where wind farms tend to be quite largeworld’s largest offshore wind farm to date – a 40 MW project

Bolinger, Mark

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Characterization of Wind Power Resource in the United States and its Intermittency  

E-Print Network (OSTI)

Wind resource in the continental and offshore United States has been reconstructed and characterized using metrics that describe, apart from abundance, its availability, persistence and intermittency. The Modern Era ...

Gunturu, U.B.

202

PureComfort 240 Combined Cooling,Heating,and Power Unit  

Science Conference Proceedings (OSTI)

This report is the second interim case study of a PureComfort 240 combined cooling, heating and power project at the University of Toronto, Mississauga.

2006-12-06T23:59:59.000Z

203

Trends of Wind and Wind Power Over the Coterminous United States.  

E-Print Network (OSTI)

??The trends of wind and wind power at a typical wind turbine hub height (80 m) are analyzed using the North American Regional Reanalysis (NARR)… (more)

Holt, Eric M

2011-01-01T23:59:59.000Z

204

Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States  

E-Print Network (OSTI)

and CSP Projects ..of the concentrating solar power (CSP) market in the U.S.1980’s, construction of CSP capacity in the U.S. largely

Wiser, Ryan

2010-01-01T23:59:59.000Z

205

Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991  

Science Conference Proceedings (OSTI)

On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

Not Available

1991-10-01T23:59:59.000Z

206

U.S. Job Creation Due to Nuclear Power Resurgence in The United States — Volumes 1 and 2  

SciTech Connect

The recent revival of interest in nuclear power is causing a reexamination of the role of nuclear power in the United States. This renewed interest has led to questions regarding the capability and capacity of current U.S. industries to support a renewal of nuclear power plant deployment. This study was conducted to provide an initial estimate of jobs to be gained in the U.S. through the repatriation of the nuclear manufacturing industry. In the course of the study, related job categories were also modeled to provide an additional estimate of the potential expansion of existing industries (i.e., plant construction and operations) in conjunction with the repatriation of manufacturing jobs.

Catherine M. Plowman

2004-11-01T23:59:59.000Z

207

Cost of Power Interruptions to Electricity Consumers in the UnitedStates (U.S.)  

SciTech Connect

The massive electric power blackout in the northeastern U.S.and Canada on August 14-15, 2003 catalyzed discussions about modernizingthe U.S. electricity grid. Industry sources suggested that investments of$50 to $100 billion would be needed. This work seeks to better understandan important piece of information that has been missing from thesediscussions: What do power interruptions and fluctuations in powerquality (power-quality events) cost electricity consumers? We developed abottom-up approach for assessing the cost to U.S. electricity consumersof power interruptions and power-quality events (referred to collectivelyas "reliability events"). The approach can be used to help assess thepotential benefits of investments in improving the reliability of thegrid. We developed a new estimate based on publicly availableinformation, and assessed how uncertainties in these data affect thisestimate using sensitivity analysis.

Hamachi LaCommare, Kristina; Eto, Joseph H.

2006-02-16T23:59:59.000Z

208

History of Sandia National Laboratories` auxiliary closure mechanisms  

SciTech Connect

An essential component of a horizontal, underground nuclear test setup at the Nevada Test Site is the auxiliary closure system. The massive gates that slam shut immediately after a device has been detonated allow the prompt radiation to pass, but block debris and hot gases from continuing down the tunnel. Thus, the gates protect experiments located in the horizontal line-of-sight steel pipe. Sandia National Laboratories has been the major designer and developer of these closure systems. This report records the history of SNL`s participation in and contributions to the technology of auxiliary closure systems used in horizontal tunnel tests in the underground test program.

Weydert, J.C. [Sandia National Labs., Albuquerque, NM (United States); Ponder, G.M. [Geo-Centers, Inc., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

209

Correlation Between Geographically Dispersed Concentrating Solar Power and Demand in the United States  

Science Conference Proceedings (OSTI)

Correlations between the electricity generated by concentrating solar thermal power (CSP) plants, as well as cross-correlations between CSP, wind power and electricity demand, have significant impacts on decisions for how much and where to build utility-scale CSP capacity, the optimal amount of thermal storage in the CSP plants, reserve capacity needed to back-up the system, as well as the expected levels of curtailed renewable power. Accurately estimating these correlations is vital to performing detailed analyses of high renewable penetration scenarios. This study quantifies the degree of correlation between geographically dispersed CSP, as well as the correlation between CSP and wind power, and CSP and electricity demand in 356 discrete regions in the contiguous US. Correlations are calculated using hourly data on an annual basis. Maps of the correlations will be presented to illustrate the degree of correlation between solar power and the demand it is serving, as well as the synergies between the negatively-correlated wind power and solar power serving the same region.

Mowers, M.; Helm, C.; Blair, N.; Short, W.

2010-01-01T23:59:59.000Z

210

A comparative analysis of business structures suitable forfarmer-owned wind power projects in the United States  

DOE Green Energy (OSTI)

For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus ''cooperative'' ownership, and the state and utility service territory in which the project will be located.

Bolinger, Mark; Wiser, Ryan

2004-11-11T23:59:59.000Z

211

Cost of Power Interruptions to Electricity Consumers in the United States (U.S.)  

E-Print Network (OSTI)

ever power-quality- cost estimate of $26 billion per yearcovers. Typically, outage-cost estimates are based on whatof uncertainty in the cost estimates that have been prepared

Hamachi LaCommare, Kristina; Eto, Joseph H.

2006-01-01T23:59:59.000Z

212

Potential Role of Concentrating Solar Power in Enabling High Renewables Scenarios in the United States  

Science Conference Proceedings (OSTI)

This work describes the analysis of concentrating solar power (CSP) in two studies -- The SunShot Vision Study and the Renewable Electricity Futures Study -- and the potential role of CSP in a future energy mix.

Denholm, P.; Hand, M.; Mai, T.; Margolis, R.; Brinkman, G.; Drury, E.; Mowers, M.; Turchi, C.

2012-10-01T23:59:59.000Z

213

Feasibility study of units 3 and 4. Batlle y Ordonez Power Station and expansion of La Tablada Power Station. Export trade information  

SciTech Connect

The study, conducted by Southern Electric International (SEI), was funded by the U.S. Trade and Development Agency on behalf of U.T.E., the Government of Uruguay's electric power company. It is an assessment of three potential projects under consideration by U.T.E. The changes resulting from these projects would add 120 to 360 megawatts capacity to the current system. The first option would involve repowering Jose Batlle y Ordonex Units 3 and 4. As an alternate to this plan, U.T.E. is considering a new combined cycle plant at a Greenfield site. The third project would increase capacity at La Tablada.

Not Available

1994-01-21T23:59:59.000Z

214

Solar powered automatic turn-on control (spa-toc) unit and method  

SciTech Connect

Orderly control of power applied by a photovoltaic solar panel d.c. source to a load is attained despite varying long and short term solar conditions by coupling power from the panel to an inverter in response to the panel voltage exceeding a predetermined level and preventing coupling of power from the panel to the inverter in response to the panel voltage being less than a predetermined level. The switching frequency of the inverter is controlled in response to the panel voltage so that approximately maximum power which the panel is capable of generating is supplied to the inverter for the incident solar energy on the panel at a given temperature. Power is supplied to the inverter by a series switch between the panel and inverter. The switch is activated into a conducting state in response to the panel voltage exceeding a predetermined value. The panel voltage controls the turn-on and turn-off levels of the series switch by a hysteresis effect, provided by connecting a dummy power dissipating load in shunt with the panel while the series switch is cut off. The dummy load has a value causing the panel output voltage to be less than the voltage for maximum panel output power. A similar series switch and hysteresis control is provided for control circuitry for the inverter. The series switch for supplying power to the control circuitry can be activated in response to the same voltage which activates the series switch for the inverter, or in response to a different voltage level.

Baker, R.H.

1982-06-01T23:59:59.000Z

215

Component Failure and Repair Data for Coal-Fired Power Units  

Science Conference Proceedings (OSTI)

A complete and consistent set of failure rate and time-to-restore data for components of a coal-fired generating unit was developed for use in the validation of a reliability and availability assessment model. This report presents the data and describes the principal methodology used--a failure modes analysis. It also includes process flow diagrams.

1981-10-01T23:59:59.000Z

216

Z .Decision Support Systems 24 1999 297310 A transmission-constrained unit commitment method in power  

E-Print Network (OSTI)

Ă?ersity of California, Berkeley, CA 94720, USA b Pacific Gas Electric Company, San Francisco, CA 94177, USA Abstract. The transmission constraints, as well as the demand and spinning reserve constraints, are relaxed by attaching generating units over a short-term planning horizon subject to the satisfaction of demand and other system

Oren, Shmuel S.

217

Carbon Dioxide Emissions from the Generation of Electric Power in the United States 1998  

Reports and Publications (EIA)

The President issued a directive on April 15, 1999, requiring an annual report summarizing carbon dioxide (CO2) emissions produced by electricity generation in the United States, including both utilities and nonutilities. In response, this report is jointly submitted by the U.S. Department of Energy and the U.S. Environmental Protection Agency.

Information Center

1999-10-15T23:59:59.000Z

218

Design of heat-recovery and seed-recovery units in MHD power generation  

DOE Green Energy (OSTI)

Crucial and limiting engineering and materials problems associated with the design of an MHD steam bottoming plant are discussed. Existing experimental and theoretical results on corrosion, fouling and deposits, potassium seed recovery and regeneration, are reviewed. The state of knowledge regarding the design of heat recovery and seed recovery units for coal-fired MHD plants is inadequate at the present time.

Bergman, P.D.; Joubert, J.I.; Demski, R.J.; Bienstock, D.

1974-01-01T23:59:59.000Z

219

Near-term implications of a ban on new coal-fired power plants in the United States  

Science Conference Proceedings (OSTI)

Large numbers of proposed new coal power generators in the United States have been cancelled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO{sub 2} emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changes in dispatch order, CO{sub 2} emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO{sub 2} reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies. 50 refs., 5 figs., 4 tabs.

Adam Newcomer; Jay Apt [Carnegie Mellon University, Pittsburgh, PA (United States). Carnegie Mellon Electricity Industry Center

2009-06-15T23:59:59.000Z

220

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

SciTech Connect

The amount of wind power capacity being installed globally is surging, with the United States the world leader in terms of annual market share for three years running (2005-2007). The rapidly growing market for wind has been a double-edged sword, however, as the resulting supply-demand imbalance in wind turbines, along with the rising cost of materials and weakness in the U.S. dollar, has put upward pressure on wind turbine costs, and ultimately, wind power prices. Two mitigating factors--reductions in the cost of equity provided to wind projects and improvements in project-level capacity factors--have helped to relieve some of the upward pressure on wind power prices over the last few years. Because neither of these two factors can be relied upon to further cushion the blow going forward, policymakers should recognize that continued financial support may be necessary to sustain the wind sector at its current pace of development, at least in the near term. Though this article emphasizes developments in the U.S. market for wind power, those trends are similar to, and hold implications for, the worldwide wind power market.

Bolinger, Mark A; Wiser, Ryan

2008-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics  

SciTech Connect

The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

None

1998-04-01T23:59:59.000Z

222

Review of Alternate Hydrazine Injection Data: South Texas Project Power Station -- Unit 1  

Science Conference Proceedings (OSTI)

This report reviews South Texas Project Unit 1 chemistry data collected before, during, and after alternate hydrazine injections in 1999. Normally, hydrazine is injected into the condensate system just after the condensate polishers, but during alternate hydrazine injection periods, hydrazine was fed into the feedwater system just after the last feedwater heater. The main objective of these injections was to reduce feedwater iron concentrations; additionally, their effect on several chemistry parameters ...

2001-06-11T23:59:59.000Z

223

HE ELECTRIC POWER INDUSTRY in the United States is facing a disquieting shortage  

E-Print Network (OSTI)

. "The power industry--both utilities and manufacturers--hires bright people [with college degrees] who & manufacturing technology 88 850 7 Signals & applications 87 000 8 Antennas & propagation 86 000 9 Signal of electric and hybrid vehicles. These activities are, in turn, leading to lecture top- ics and lab exercises

224

Establishing a Groundwater Protection Program for New Nuclear Generating Units: Appendix to the EPRI Groundwater Protection Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

New nuclear power plants should plan for groundwater protection early in the planning process. The construction project team should be made aware of the need to establish the groundwater protection program prior to the construction planning process. This document provides guidance for establishing Groundwater Protection Programs for new nuclear generating units. It applies to new nuclear generating units on both new and existing nuclear power plant ...

2013-03-27T23:59:59.000Z

225

Algorithm for Screening Phasor Measurement Unit Data for Power System Events and Categories and Common Characteristics for Events Seen in Phasor Measurement Unit Relative Phase-Angle Differences and Frequency Signals  

SciTech Connect

A network of multiple phasor measurement units (PMU) was created, set up, and maintained at the University of Texas at Austin to obtain actual power system measurements for power system analysis. Power system analysis in this report covers a variety of time ranges, such as short- term analysis for power system disturbances and their effects on power system behavior and long- term power system behavior using modal analysis. The first objective of this report is to screen the PMU data for events. The second objective of the report is to identify and describe common characteristics extracted from power system events as measured by PMUs. The numerical characteristics for each category and how these characteristics are used to create selection rules for the algorithm are also described. Trends in PMU data related to different levels and fluctuations in wind power output are also examined.

Allen, A.; Santoso, S.; Muljadi, E.

2013-08-01T23:59:59.000Z

226

The evolution of NOx control policy for coal-fired power plants in the United States  

Science Conference Proceedings (OSTI)

Emissions of nitrogen oxides (NOx) contribute to formation of particulate matter and ozone, and also to acidification of the environment. The electricity sector is responsible for about 20% of NOx emissions in the United States, and the sector has been the target of both prescriptive (command-and-control) and flexible (cap-and-trade) approaches to regulation. The paper summarises the major NOx control policies affecting this sector in the USA, and provides some perspectives as to their effectiveness. While both prescriptive and flexible approaches continue to play an important role, significant new proposals have wholly embraced a cap-and-trade approach. 20 refs., 7 figs., 2 tabs.

Dallas Burtraw; David A. Evans

2003-12-15T23:59:59.000Z

227

Wind Power Development in the United States: Current Progress, Future Trends  

SciTech Connect

The U.S. wind power industry is in an era of substantial growth, with the U.S. and China likely to vie for largest-market status for years to come. With the market evolving at such a rapid pace, keeping up with current trends in the marketplace has become increasingly difficult. At the same time, limits to future growth are uncertain. This paper summarizes major trends in the U.S. wind market, and explores the technical and economic feasibility of achieving much greater levels of wind penetration. China would be well served to conduct similar analyses of the feasibility, benefits, challenges, and policy needs associated with much higher levels of wind power generation than currently expressed in national targets.

Wiser, Ryan H

2008-10-29T23:59:59.000Z

228

The Los Alamos 600 MJ, 1500 MW inertial energy storage and pulsed power unit  

DOE Green Energy (OSTI)

A 1430 MVA synchronous generator from a cancelled nuclear power plant has been installed and commissioned at Los Alamos National Laboratory (LANL) to be used as the pulsed power generator for physics experiments. The generator is mounted on a spring foundation to prevent dynamic forces from being transmitted to the substructure and into the ground. A 6 MW load-commutated inverter drive accelerates the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method has been changed from hydrogen to air cooling to facilitate operation. A current limiting fuse, with a fuse clearing current of 90 kA, will protect the generator output against short circuit currents. An overview of the installation is presented. The paper also addresses the overload capability of the generator for pulsed loads. 7 figs., 1 tab.

Boenig, H.J.

1991-01-01T23:59:59.000Z

229

Future Intelligent Power Grids: Analysis of the vision in the European Union and the United States  

Science Conference Proceedings (OSTI)

The future of power grids is expected to involve an increasing level of intelligence and integration of new information and communication technologies in every aspect of the electricity system, from demand-side devices to wide-scale distributed generation to a variety of energy markets. This paper provides a general outlook of the definition of this future in the U.S. and the European Union and compares two approaches—GridWiseTM and SmartGrid. It describes the contexts in both the worlds, as they influence the two visions of the future intelligent power grid, and as they form foundations at each respective federal level for supporting research in this field. The similarities and complementarities of the two research programs are examined. Within the framework of a solid precedence for trans-Atlantic cooperation in energy research, the time would seem optimal to set in motion active collaboration and educational exchange on GridWise and SmartGrid research. This paper will help energy policy makers to better understand the key issues determining the two different approaches and the two different policies derived from them; as well as a comparison of the solution provided in each case. This work will also be useful for researchers and industry decision makers to be aware of trans-Atlantic approaches, opportunities, and resources looking toward future, more intelligent and interconnected power grids.

Coll-Mayor, Debora; Paget, Mia L.; Lightner, Eric M.

2007-04-01T23:59:59.000Z

230

Policies and Market Factors Driving Wind Power Development in the United States  

DOE Green Energy (OSTI)

In the United States, there has been substantial recent growth in wind energy generating capacity, with growth averaging 24% annually during the past five years. With this growth, an increasing number of states are experiencing investment in wind energy. Wind installations currently exist in about half of all U.S. states. This paper explores the policies and market factors that have been driving utility-scale wind energy development in the United States, particularly in the states that have achieved a substantial amount of wind energy investment in recent years. Although there are federal policies and overarching market issues that are encouraging investment nationally, much of the recent activity has resulted from state-level policies or localized market drivers. In this paper, we identify the key policies, incentives, regulations, and markets affecting development, and draw lessons from the experience of leading states that may be transferable to other states or regions. We provide detailed discussions of the drivers for wind development in a dozen leading states-California, Colorado, Iowa, Kansas, Minnesota, New York, Oregon, Pennsylvania, Texas, Washington, West Virginia, and Wyoming.

Bird, L.; Parsons, B.; Gagliano, T.; Brown, M.; Wiser, R.; Bolinger, M.

2003-07-01T23:59:59.000Z

231

Community wind power ownership schemes in Europe and their relevance to the United States  

DOE Green Energy (OSTI)

With varying success, the United States and Europe have followed a more or less parallel path of policies to support wind development over the past twenty years. Feed-in laws and tax incentives first popularized in California in the early 1980s and greatly expanded upon in Europe during the 1990s are gradually giving way to market-based support mechanisms such as renewable portfolio standards, which are being implemented in one form or another in ten US states and at least three European nations. At the same time, electricity markets are being liberalized in both the US and Europe, and many electricity consumers are being given the choice to support the development of renewable energy through higher tariffs, both in traditionally regulated and newly competitive markets. One notable area in which wind development in Europe and United States has not evolved in common, however, is with respect to the level of community ownership of wind turbines or clusters. While community ownership of wind projects is unheard of in the United States, in Europe, local wind cooperatives or other participatory business schemes have been responsible for a large share of total wind development. In Denmark, for example, approximately 80% of all wind turbines are either individually or cooperatively owned, and a similar pattern holds in Germany, the world leader in installed wind capacity. Sweden also has a strong wind cooperative base, and the UK has recently made forays into community wind ownership. Why is it that wind development has evolved this way in Europe, but not in the United States? What incremental effect have community-owned wind schemes had on European wind development? Have community-owned wind schemes driven development in Europe, or are they merely a vehicle through which the fundamental driving institutions have been channeled? Is there value to having community wind ownership in the US? Is there reason to believe that such schemes would succeed in the US? If so, which model seems most appropriate, and what barriers--legal, regulatory, tax, market, or investment--stand in the way of implementing such a scheme? These are the questions this report seeks to address. The report begins with a discussion of the relative advantages and disadvantages of community wind ownership, as opposed to the large commercially-owned projects that have so far dominated US wind development. Next, four detailed case studies relate community-owned wind experience in Denmark, Sweden, the UK, Germany, focusing primarily on the different participatory models employed in each country. The report then categorizes the various models into three main groupings--community-led, developer-led, and investment funds--and draws general conclusions about the success of each category in Europe, and the conditions that dictate the effective use of one approach over another. Finally, the focus shifts to the US, where the report discusses the domestic barriers facing each model category, and identifies the category offering the most value with the fewest barriers to implementation. The report concludes with a high-level introduction to potential applications for community wind ownership within the United States.

Bolinger, Mark

2001-05-15T23:59:59.000Z

232

Advanced Gas Turbine Guidelines: Performance Retention for GE 7F Unit in Peaking Operation: Durability Surveillance at Potomac Elect ric Power Company's Station H  

Science Conference Proceedings (OSTI)

Worldwide pressures to reduce power generation costs have encouraged domestic and foreign manufacturers to build high-efficiency gas turbines implementing the latest technological advances. To assure the staying power of these turbines, EPRI launched a multi-year durability surveillance program. This report discusses performance monitoring and analysis of a General Electric 7F unit in peaking operation.

1999-04-26T23:59:59.000Z

233

Land Use Requirements of Modern Wind Power Plants in the United States  

DOE Green Energy (OSTI)

This report provides data and analysis of the land use associated with modern, large wind power plants (defined as greater than 20 megawatts (MW) and constructed after 2000). The analysis discusses standard land-use metrics as established in the life-cycle assessment literature, and then discusses their applicability to wind power plants. The report identifies two major 'classes' of wind plant land use: 1) direct impact (i.e., disturbed land due to physical infrastructure development), and 2) total area (i.e., land associated with the complete wind plant project). The analysis also provides data for each of these classes, derived from project applications, environmental impact statements, and other sources. It attempts to identify relationships among land use, wind plant configuration, and geography. The analysts evaluated 172 existing or proposed projects, which represents more than 26 GW of capacity. In addition to providing land-use data and summary statistics, they identify several limitations to the existing wind project area data sets, and suggest additional analysis that could aid in evaluating actual land use and impacts associated with deployment of wind energy.

Denholm, P.; Hand, M.; Jackson, M.; Ong, S.

2009-08-01T23:59:59.000Z

234

Power Supply Changes for NSTX Resistive Wall Mode Coils  

SciTech Connect

The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils need fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.

Ramakrishnan, S S.

2013-06-28T23:59:59.000Z

235

Human Operational Errors Involving Control, Relay, and Auxiliary Equipment  

Science Conference Proceedings (OSTI)

This report describes the objectives, information gathering and analysis, and findings of a research effort related to human operational errors involving control, relay, and auxiliary equipment. This research is conducted by the Switching Safety and Reliability Project of EPRI8217s Substations Program. The project consists of three separate studies: 8226 an analysis of relay-related incidents attributed to human errors, 8226 a compilation of work practices when planning and performing work on relays, an...

2006-12-08T23:59:59.000Z

236

Multi-area power system state estimation utilizing boundary measurements and phasor measurement units ( PMUs)  

E-Print Network (OSTI)

The objective of this thesis is to prove the validity of a multi-area state estimator and investigate the advantages it provides over a serial state estimator. This is done utilizing the IEEE 118 Bus Test System as a sample system. This thesis investigates the benefits that stem from utilizing a multi-area state estimator instead of a serial state estimator. These benefits are largely in the form of increased accuracy and decreased processing time. First, the theory behind power system state estimation is explained for a simple serial estimator. Then the thesis shows how conventional measurements and newer, more accurate PMU measurements work within the framework of weighted least squares estimation. Next, the multi-area state estimator is examined closely and the additional measurements provided by PMUs are used to increase accuracy and computational efficiency. Finally, the multi-area state estimator is tested for accuracy, its ability to detect bad data, and computation time.

Freeman, Matthew A

2006-08-01T23:59:59.000Z

237

Power conversion unit studies for the next generation nuclear plant coupled to a high-temperature steam electrolysis facility  

E-Print Network (OSTI)

The Department of Energy and the Idaho National Laboratory are developing a Next Generation Nuclear Plant (NGNP) to serve as a demonstration of state-of-the-art nuclear technology. The purpose of the demonstration is two fold: 1) efficient low cost energy generation and 2) hydrogen production. Although a next generation plant could be developed as a single-purpose facility, early designs are expected to be dual-purpose. While hydrogen production and advanced energy cycles are still in their early stages of development, research towards coupling a high temperature reactor, electrical generation and hydrogen production is under way. Many aspects of the NGNP must be researched and developed to make recommendations on the final design of the plant. Parameters such as working conditions, cycle components, working fluids, and power conversion unit configurations must be understood. Three configurations of the power conversion unit were modeled using the process code HYSYS; a three-shaft design with 3 turbines and 4 compressors, a combined cycle with a Brayton top cycle and a Rankine bottoming cycle, and a reheated cycle with 3 stages of reheat were investigated. A high temperature steam electrolysis hydrogen production plant was coupled to the reactor and power conversion unit by means of an intermediate heat transport loop. Helium, CO2, and an 80% nitrogen, 20% helium mixture (by weight) were studied to determine the best working fluid in terms cycle efficiency and development cost. In each of these configurations the relative heat exchanger size and turbomachinery work were estimated for the different working fluids. Parametric studies away from the baseline values of the three-shaft and combined cycles were performed to determine the effect of varying conditions in the cycle. Recommendations on the optimal working fluid for each configuration were made. The helium working fluid produced the highest overall plant efficiency for the three-shaft and reheat cycle; however, the nitrogen-helium mixture produced similar efficiency with smaller component sizes. The CO2 working fluid is recommend in the combined cycle configuration.

Barner, Robert Buckner

2006-12-01T23:59:59.000Z

238

Optimal sizing study of hybrid wind/PV/diesel power generation unit  

Science Conference Proceedings (OSTI)

In this paper, a methodology of sizing optimization of a stand-alone hybrid wind/PV/diesel energy system is presented. This approach makes use of a deterministic algorithm to suggest, among a list of commercially available system devices, the optimal number and type of units ensuring that the total cost of the system is minimized while guaranteeing the availability of the energy. The collection of 6 months of data of wind speed, solar radiation and ambient temperature recorded for every hour of the day were used. The mathematical modeling of the main elements of the hybrid wind/PV/diesel system is exposed showing the more relevant sizing variables. A deterministic algorithm is used to minimize the total cost of the system while guaranteeing the satisfaction of the load demand. A comparison between the total cost of the hybrid wind/PV/diesel energy system with batteries and the hybrid wind/PV/diesel energy system without batteries is presented. The reached results demonstrate the practical utility of the used sizing methodology and show the influence of the battery storage on the total cost of the hybrid system. (author)

Belfkira, Rachid; Zhang, Lu; Barakat, Georges [Groupe de Recherche en Electrotechnique et Automatique du Havre, University of Le Havre, 25 rue Philippe Lebon, BP 1123, 76063 Le Havre (France)

2011-01-15T23:59:59.000Z

239

Supporting Solar Power in Renewables Portfolio Standards: Experience from the United States  

DOE Green Energy (OSTI)

Among the available options for encouraging the increased deployment of renewable electricity, renewables portfolio standards (RPS) have become increasingly popular. The RPS is a relatively new policy mechanism, however, and experience with its use is only beginning to emerge. One key concern that has been voiced is whether RPS policies will offer adequate support to a wide range of renewable energy technologies and applications or whether, alternatively, RPS programs will favor a small number of the currently least-cost forms of renewable energy. This report documents the design of and early experience with state-level RPS programs in the United States that have been specifically tailored to encourage a wider diversity of renewable energy technologies, and solar energy in particular. As shown here, state-level RPS programs specifically designed to support solar have already proven to be an important, albeit somewhat modest, driver for solar energy deployment, and those impacts are projected to continue to build in the coming years. State experience in supporting solar energy with RPS programs is mixed, however, and full compliance with existing requirements has not been achieved. The comparative experiences described herein highlight the opportunities and challenges of applying an RPS to specifically support solar energy, as well as the importance of policy design details to ensuring that program goals are achieved.

Wiser, Ryan; Barbose, Galen; Holt, Edward

2010-10-01T23:59:59.000Z

240

Auxiliary/Master microprocessor CAMAC Crate Controller applications  

SciTech Connect

The need for further sophistication of an already complex serial CAMAC control system at Fermilab led to the development of an Auxilary/Master CAMAC Crate Controller. The controller contains a Motorola 6800 microprocessor, 2K bytes of RAM, and 8K bytes of PROM memory. Bussed dataway lines are time shared with CAMAC signals to provide memory expansion and direct addressing of peripheral devices without the need of external cabling. The Auxiliary/Master Crate Controller (A/MCC) can function as either a Master, i.e., stand alone, crate controller or as an Auxiliary controller to Fermilab's Serial Crate Controller (SCC). Two modules, one single- and one double-width, make up an A/ MCC. The microprocessor has one nonmaskable and one maskable vectored interrupt. Time sharing the dataway between SCC programmed and block transfer generated dataway cycles and A/MCC operations still allows a 99 percent microprocessor CPU busy time. Since the conception of the A/MCC, there has been an increasing number of control system-related projects proposed which would not have been possible or would have been very difficult to implement without such a device. The first such application now in use at Fermilab is a stand-alone control system for a mass spectrometer experiment in the Main Ring Internal Target Area. This application in addition to other proposed A/MCC applications, both stand-alone and auxiliary, is discussed. (auth)

Barsotti, E.

1975-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

SciTech Connect

Renewable power technologies are inherently capital-intensive, often (but not always) with relatively high construction costs and low operating costs. For this reason, renewable power technologies are typically more sensitive to the availability and cost of financing than are natural gas power plants, for example. In the United States, the bulk of renewable project finance in recent years has been provided by 'tax equity investors' (typically large investment banks and insurance companies) who partner with project developers through highly specialized financing structures (Bolinger, 2009; Cory et al., 2008; Harper et al., 2007). These structures have been designed primarily to capitalize on federal support for renewable power technologies, which has historically come in the form of tax credits and accelerated depreciation deductions. The number of tax equity investors active in the renewable power market has declined precipitously, however, as a result of the financial crisis that began unfolding across the globe in the summer of 2008. The resulting shortage and increased cost of project financing has, in turn, slowed the development of new renewable power projects, leading to layoffs throughout the entire industry supply chain. In recognition of the fact that tax-based policy incentives are not particularly effective when tax burdens are shrinking or non-existent, Congress included several provisions in 'The American Recovery and Reinvestment Act of 2009' (ARRA 2009) designed to make federal incentives for renewable power technologies more useful. Among these provisions is one that allows projects eligible to receive the production tax credit ('the PTC', see Text Box 1) to instead elect the investment tax credit ('the ITC', see Text Box 2). Another provision enables ITC-eligible projects (which now include most PTC-eligible renewable power projects) to instead receive--for a limited time only--a cash grant of equivalent value. These two provisions (among others) could have a significant impact on how renewable power projects are financed over the next few years. The purpose of this report is to both quantitatively and qualitatively analyze, from the project developer/owner perspective, the choice between the PTC and the ITC (or equivalent cash grant) for a number of different renewable power technologies.1 Because the two credits are structured differently, and apply in different ways to different technologies, the choice between the two lends itself to quantitative financial analysis of the conditions under which either the PTC or the ITC would, at least in theory, provide greater financial value. Qualitative considerations may be equally important, however, particularly in instances where quantitative differences are modest. This report proceeds as follows. Section 2 provides a brief summary of ARRA 2009, with some emphasis on those provisions designed to ease the liquidity crisis facing the renewable power sector. Section 3 describes the quantitative analysis methodology, as well as modeling results for wind, open-loop biomass, closed-loop biomass, geothermal, and landfill gas projects. Section 4 discusses a number of qualitative considerations that may play as important of a role as quantitative results in deciding between the PTC and the ITC (or equivalent cash grant). Section 5 concludes, and an Appendix provides supplemental tables that present quantitative analysis results conducted at different discount rates.

Bolinger, Mark; Wiser, Ryan; Cory, Karlynn; James, Ted

2009-03-11T23:59:59.000Z

242

ASSESSMENT OF THE RADIONUCLIDE COMPOSITION OF "HOT PARTICLES" SAMPLED IN THE CHERNOBYL NUCLEAR POWER PLANT FOURTH REACTOR UNIT  

SciTech Connect

Fuel-containing materials sampled from within the Chernobyl Nuclear Power Plant (ChNPP) 4th Reactor Unit Confinement Shelter were spectroscopically studied for gamma and alpha content. Isotopic ratios for cesium, europium, plutonium, americium, and curium were identified and the fuel burnup in these samples was determined. A systematic deviation in the burnup values based on the cesium isotopes, in comparison with other radionuclides, was observed. The conducted studies were the first ever performed to demonstrate the presence of significant quantities of {sup 242}Cm and {sup 243}Cm. It was determined that there was a systematic underestimation of activities of transuranic radionuclides in fuel samples from inside of the ChNPP Confinement Shelter, starting from {sup 241}Am (and going higher), in comparison with the theoretical calculations.

Farfan, E.; Jannik, T.; Marra, J.

2011-10-01T23:59:59.000Z

243

Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment  

Science Conference Proceedings (OSTI)

The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150.

Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

1987-02-01T23:59:59.000Z

244

Induced Radioactivity and Waste Classification of Reactor Zone Components of the Chernobyl Nuclear Power Plant Unit 1 After Final Shutdown  

SciTech Connect

The dismantlement of the reactor core materials and surrounding structural components is a major technical concern for those planning closure and decontamination and decommissioning of the Chernobyl Nuclear Power Plant (NPP). Specific issues include when and how dismantlement should be accomplished and what the radwaste classification of the dismantled system would be at the time it is disassembled. Whereas radiation levels and residual radiological characteristics of the majority of the plant systems are directly measured using standard radiation survey and radiochemical analysis techniques, actual measurements of reactor zone materials are not practical due to high radiation levels and inaccessibility. For these reasons, neutron transport analysis was used to estimate induced radioactivity and radiation levels in the Chernobyl NPP Unit 1 reactor core materials and structures.Analysis results suggest that the optimum period of safe storage is 90 to 100 yr for the Unit 1 reactor. For all of the reactor components except the fuel channel pipes (or pressure tubes), this will provide sufficient decay time to allow unlimited worker access during dismantlement, minimize the need for expensive remote dismantlement, and allow for the dismantled reactor components to be classified as low- or medium-level radioactive waste. The fuel channel pipes will remain classified as high-activity waste requiring remote dismantlement for hundreds of years due to the high concentration of induced {sup 63}Ni in the Zircaloy pipes.

Bylkin, Boris K. [Russian Research Center 'Kurchatov Institute' (Russian Federation); Davydova, Galina B. [Russian Research Center 'Kurchatov Institute' (Russian Federation); Zverkov, Yuri A. [Russian Research Center 'Kurchatov Institute' (Russian Federation); Krayushkin, Alexander V. [Russian Research Center 'Kurchatov Institute' (Russian Federation); Neretin, Yuri A. [Chernobyl Nuclear Power Plant (Ukraine); Nosovsky, Anatoly V. [Slavutych Division of the International Chernobyl Center (Ukraine); Seyda, Valery A. [Chernobyl Nuclear Power Plant (Ukraine); Short, Steven M. [Pacific Northwest National Laboratory (United States)

2001-10-15T23:59:59.000Z

245

Fish passage mitigation of impacts from hydroelectric power projects in the United States  

DOE Green Energy (OSTI)

Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

Cada, G.F. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

1996-10-01T23:59:59.000Z

246

Effect on the condition of the metal in A K-300-3.5 turbine owing to multicycle fatigue from participation of a power generating unit in grid frequency and power regulation  

Science Conference Proceedings (OSTI)

The effect on the condition of the rotor material owing to multicycle fatigue caused by variable stresses during participation of a power generating unit in grid frequency and power regulation is evaluated using the K-300-23.5 steam turbine as an example. It is shown that during normalized primary frequency regulation the safety factor is at least 50, while during automatic secondary regulation of frequency and power there is essentially no damage to the metal.

Lebedeva, A. I.; Zorchenko, N. V.; Prudnikov, A. A.

2011-09-15T23:59:59.000Z

247

Superconducting magnetic energy storage for electric power system dynamic stabilization  

DOE Green Energy (OSTI)

A Superconducting Magnetic Energy Storage (SMES) system is being developed at the Los Alamos Scientific Laboratory (LASL) for a dynamic stabilizer to be installed in the Bonneville Power Administration (BPA) power system at Tacoma, Washington, by 1982. This unit will be an alternate stabilization method to the dc modulator now used to stabilize the 900 mile, ac intertie between BPA and Southern California. The generation control systems' response to the constantly occuring, small-load and voltage changes can result in negatively damped, low-frequency power oscillations. The dc modulator provides stabilization by fast load control of the High-Voltage dc (HVDC). The SMES unit consists of a 30-MJ solenoid, a 10 MW convertor, a liquid helium dewar and auxiliary systems which operate independent of the HVDC system. The SMES dynamic stabilizer design is presented with status information about the superconducting coil, the converter and other components of the SMES dynamic stabilizer summarized.

Turner, R.

1979-01-01T23:59:59.000Z

248

Superconducting Magnetic Energy Storage for electric power system dynamic stabilization  

DOE Green Energy (OSTI)

A Superconducting Magnetic Energy Storage (SMES) system is being developed at the Los Alamos Scientific Laboratory (LASL) for a dynamic stabilizer to be installed in the Bonneville Power Administration (BPA) power system at Tacoma, Washington, by 1982. This unit will be an alternate stabilization method to the dc modulator now used to stabilize the 900 mile, ac intertie between BPA and Southern California. The generation control systems' response to the constantly occurring, small-load and voltage changes can result in negatively damped, low-frequency power oscillations. The dc modulator provides stabilization by fast load control of the High-Voltage dc (HVDC). The SMES unit consists of a 30-MJ solenoid, a 10-MW convertor, a liquid helium dewar, and auxiliary systems which operate independent of the HVDC system. The SMES dynamic stabilizer design is presented and status information is given about the superconducting coil, the converter, and other components of the SMES dynamic stabilizer.

Turner, R.D.

1979-01-01T23:59:59.000Z

249

Visions of Future Intelligent Power Grids: Synergies for Collaboration Between the European Union and the United States  

Science Conference Proceedings (OSTI)

The future of power grids is expected to involve an increasing level of intelligence and integration of new information and communication technologies in every aspect of the electricity system, from demand-side devices to wide-scale distributed generation to a variety of energy markets. The vision of this future in the United States and the European Union is known as GridWiseTM and SmartGrid, respectively. The results of the examination of similarities and complementarities of the two research programs are presented in this paper. Within the framework of a solid precedence for trans-Atlantic cooperation in energy research, the time would seem optimal to set in motion active collaboration and educational exchange on GridWise and SmartGrid research. This paper will provide energy professionals with a comparison of the solutions developed in each case, to be aware of trans-Atlantic approaches, opportunities, and resources looking toward future, more intelligent and interconnected power grids.

Coll-Mayor, Debora; Paget, Mia L.; Lightner, Eric M.; Sanchez-Jimenez, Manuel

2007-01-01T23:59:59.000Z

250

A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States  

E-Print Network (OSTI)

Support for Community Wind Power Development. LBNL-54715.Analysis of Community Wind Power Development Options inWhip Up Hopes for Wind Power Again. ” The Wall Street

Bolinger, Mark; Wiser, Ryan

2004-01-01T23:59:59.000Z

251

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network (OSTI)

2002) Economic Impacts of Wind Power in Kittitas County, WA.about Large Offshore Wind Power: Underlying Factors. EnergyOpinion on Offshore Wind Power - Interim Report. University

Hoen, Ben

2010-01-01T23:59:59.000Z

252

Scaling Analysis for the Direct Reactor Auxiliary Cooling System for AHTRs  

Science Conference Proceedings (OSTI)

The Direct Reactor Auxiliary Cooling System (DRACS), shown in Fig. 1 [1], is a passive heat removal system proposed for the Advanced High-Temperature Reactor (AHTR). It features three coupled natural circulation/convection loops completely relying on the buoyancy as the driving force. A prototypic design of the DRACS employed in a 20-MWth AHTR has been discussed in our previous work [2]. The total height of the DRACS is usually more than 10 m, and the required heating power will be large (on the order of 200 kW), both of which make a full-scale experiment not feasible in our laboratory. This therefore motivates us to perform a scaling analysis for the DRACS to obtain a scaled-down model. In this paper, theory and methodology for such a scaling analysis are presented.

Yoder Jr, Graydon L [ORNL; Wilson, Dane F [ORNL; Wang, X. NMN [Ohio State University; Lv, Q. NMN [Ohio State University; Sun, X NMN [Ohio State University; Christensen, R. N. [Ohio State University; Blue, T. E. [Ohio State University; Subharwall, Piyush [Idaho National Laboratory (INL)

2011-01-01T23:59:59.000Z

253

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network (OSTI)

Opinion about Large Offshore Wind Power: Underlying Factors.Delaware Opinion on Offshore Wind Power - Interim Report.

Hoen, Ben

2010-01-01T23:59:59.000Z

254

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

E-Print Network (OSTI)

hydroelectric, and marine and hydrokinetic power, are notmarine and hydrokinetic facilities. For wind, closed-loop biomass, and geothermal power,

Bolinger, Mark

2009-01-01T23:59:59.000Z

255

Fault diagnosis for the feedwater heater system of a 300MW coal-fired power generating unit based on RBF neural network  

Science Conference Proceedings (OSTI)

In this paper, a new style radial basis function (RBF) neural network is used for fault diagnosis of the high-pressure feed-water heater system of a coal-fired power generating unit. The structure of the RBF network and its training algorithm are given. ...

Liangyu Ma; Yongguang Ma; Jin Ma

2005-08-01T23:59:59.000Z

256

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

cost of both natural gas and coal power plants in the Unitedof natural gas- and coal-fired power plants. Most notably,

Bolinger, Mark A

2009-01-01T23:59:59.000Z

257

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 4, NOVEMBER 2001 939 Closure to Discussion of "Unit Commitment by Lagrangian  

E-Print Network (OSTI)

of "Unit Commitment by Lagrangian Relaxation and Genetic Algorithms" Chuan-Ping Cheng, Chih-Wen Liu paper1 entitled "Unit Commitment by Lagrangian Relaxation and Genetic Algorithms." In the following, we- ation and Genetic Algorithms to solve the unit commitment problem. The basic idea of proposed LRGA

Rudnick, Hugh

258

The effect of high penetration of wind power on primary frequency control of power systems.  

E-Print Network (OSTI)

??In this work, a power system with wind power units and hydro power units are considered. The hydro power unit and variable speed wind turbine… (more)

Motamed, Bardia

2013-01-01T23:59:59.000Z

259

Renewable Energy Powers Renewable Energy Lab, Employees  

E-Print Network (OSTI)

and the lab's new entrance sign. An experimental 12-kilowatt rooftop solar system also feeds electricity back. NREL is also using solar energy for auxiliary purposes such as powering streetlights, water pumps

260

Technical safety requirements for the Auxiliary Hot Cell Facility (AHCF).  

Science Conference Proceedings (OSTI)

These Technical Safety Requirements (TSRs) identify the operational conditions, boundaries, and administrative controls for the safe operation of the Auxiliary Hot Cell Facility (AHCF) at Sandia National Laboratories, in compliance with 10 CFR 830, 'Nuclear Safety Management.' The bases for the TSRs are established in the AHCF Documented Safety Analysis (DSA), which was issued in compliance with 10 CFR 830, Subpart B, 'Safety Basis Requirements.' The AHCF Limiting Conditions of Operation (LCOs) apply only to the ventilation system, the high efficiency particulate air (HEPA) filters, and the inventory. Surveillance Requirements (SRs) apply to the ventilation system, HEPA filters, and associated monitoring equipment; to certain passive design features; and to the inventory. No Safety Limits are necessary, because the AHCF is a Hazard Category 3 nuclear facility.

Seylar, Roland F.

2004-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Discussions on Disposal Forms of Auxiliary Heat Source in Surface Water Heat Pump System  

E-Print Network (OSTI)

This paper presents two common forms of auxiliary heat source in surface water heat pump system and puts forward the idea that the disposal forms affect operation cost. It deduces operation cost per hour of the two forms. With a project calculation, it illuminates that the post-located auxiliary heat source cheaper and superior to the fore-located one.

Qian, J.; Sun, D.; Li, X.; Li, G.

2006-01-01T23:59:59.000Z

262

Turbine Generator Auxiliary Systems Volume 1: Turbine Generator Lubrication System Maintenance Guide -- 2012 Update  

Science Conference Proceedings (OSTI)

This report provides nuclear and fossil plant personnel with current maintenance information on lubrication system components and specifications, treatment, and analysis of the lubricating oil.BackgroundInput from member utilities indicated that maintenance guides were needed for the turbine-generator auxiliary systems. The first auxiliary system selected was the turbine-generator lubrication system used in nuclear and ...

2012-12-12T23:59:59.000Z

263

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

upward pressure on wind project costs and, by extension,turbine pricing, wind project costs, and wind power prices,pricing, installed project costs, and wind power prices, and

Bolinger, Mark A

2009-01-01T23:59:59.000Z

264

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Price (2007 $/MWh) 1998-99 COD 14 projects 624 MW Source:2007 Wind Power Price, by COD Individual Project 2007Wind Power Price, by COD 2000-01 COD 22 projects 901 MW

Bolinger, Mark A

2009-01-01T23:59:59.000Z

265

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network (OSTI)

Offshore Wind Power: Underlying Factors. Energy Policy. 35(Wind Development on Local Property Values. Renewable Energy Policy

Hoen, Ben

2010-01-01T23:59:59.000Z

266

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

Regional, State and Local Green Energy and Climate Changegreen” power (Bird et al. , 2007), state renewable energy

Bolinger, Mark A

2009-01-01T23:59:59.000Z

267

Enhancing VHTR Passive Safety and Economy with Thermal Radiation Based Direct Reactor Auxiliary Cooling System  

Science Conference Proceedings (OSTI)

One of the most important requirements for Gen. IV Very High Temperature Reactor (VHTR) is passive safety. Currently all the gas cooled version of VHTR designs use Reactor Vessel Auxiliary Cooling System (RVACS) for passive decay heat removal. The decay heat first is transferred to the core barrel by conduction and radiation, and then to the reactor vessel by thermal radiation and convection; finally the decay heat is transferred to natural circulated air or water systems. RVACS can be characterized as a surface based decay heat removal system. The RVACS is especially suitable for smaller power reactors since small systems have relatively larger surface area to volume ratio. However, RVACS limits the maximum achievable power level for modular VHTRs due to the mismatch between the reactor power (proportional to volume) and decay heat removal capability (proportional to surface area). When the relative decay heat removal capability decreases, the peak fuel temperature increases, even close to the design limit. Annular core designs with inner graphite reflector can mitigate this effect; therefore can further increase the reactor power. Another way to increase the reactor power is to increase power density. However, the reactor power is also limited by the decay heat removal capability. Besides the safety considerations, VHTRs also need to be economical in order to compete with other reactor concepts and other types of energy sources. The limit of decay heat removal capability set by using RVACS has affected the economy of VHTRs. A potential alternative solution is to use a volume-based passive decay heat removal system, called Direct Reactor Auxiliary Cooling Systems (DRACS), to remove or mitigate the limitation on decay heat removal capability. DRACS composes of natural circulation loops with two sets of heat exchangers, one on the reactor side and another on the environment side. For the reactor side, cooling pipes will be inserted into holes made in the outer or inner graphite reflector blocks. There will be gaps between these cooling pipes and their corresponding surrounding graphite surfaces. Graphite has an excellent heat conduction property. By taking advantage of this feature, we can have a volume-based method to remove decay heat. The scalability can be achieved, if needed, by employing more rows of cooling pipes to accommodate higher decay heat rates. Since heat can easily conduct through the graphite regions between the holes made for the cooling pipes, those cooling pipes located further away from the active core region can still be very effective in removing decay heat. By removing the limit on the decay heat removal capability due to the limited available surface area as in a RVACS, the reactor power and power density can be significantly increased, without losing the passive heat removal feature. This paper will introduce the concept of using DRACS to enhance VHTR passive safety and economics. Three design options will be discussed, depending on the cooling pipe locations. Analysis results from a lumped volume based model and CFD simulations will be presented.

Haihua Zhao; Hongbin Zhang; Ling Zou; Xiaodong Sun

2012-06-01T23:59:59.000Z

268

Evaluation of the Submerged Demineralizer System (SDS) flowsheet for decontamination of high-activity-level water at the Three Mile Island Unit 2 Nuclear Power Station  

Science Conference Proceedings (OSTI)

This report discusses the Submerged Demineralizer System (SDS) flowsheet for decontamination of the high-activity-level water at the Three Mile Island Unit 2 Nuclear Power Station was evaluated at Oak Ridge National Laboratory in a study that included filtration tests, ion exchange column tests, and ion exchange distribution tests. The contaminated waters, the SDS flowsheet, and the experiments made are described. The experimental results were used to predict the SDS performance and to indicate potential improvements.

Campbell, D.O., Collins, E.D., King, L.J., Knauer, J.B.

1980-07-01T23:59:59.000Z

269

Framework to Evaluate Water Demands and Availability for Electrical Power Production Within Watersheds Across the United States: Dev elopment and Applications  

Science Conference Proceedings (OSTI)

A framework to evaluate the water resources available to sustain present and projected electrical power production is under development and has been applied to four case studies around the United States. Those case studies are: the Lower Coosa River Basin (AL), the Muskingum River Basin (OH), the San Juan River Basin (CO, UT, AZ, NM), and the Platte River Basin (NE, CO, WY). The river basins were chosen for the case studies because of the difference among these basins, including climatic conditions, wate...

2005-12-12T23:59:59.000Z

270

CONFIRMATORY SURVEY RESULTS FOR PORTIONS OF THE MATERIALS AND EQUIPMENT FROM UNITS 1 AND 2 AT THE HUMBOLDT BAY POWER PLANT, EUREKA, CALIFORNIA  

DOE Green Energy (OSTI)

The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under Atomic Energy Commission (AEC) provisional license number DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures. Also, the pressure suppression containment design permitted below-ground construction. Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination—zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination. A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details).

W.C. Adams

2011-04-01T23:59:59.000Z

271

THE SNAP II POWER CONVERSION SYSTEM TOPICAL REPORT NO. 14. MERCURY MATERIALS EVALUATION AND SELECTION  

SciTech Connect

SNAP II is the designation for a 3 kw nuclear auxiliary power unit to be used in a satellite vehicle. The SNAP II System consists of a reactor heat source, a boiler, a Hg Rankine engine, an alternator, and a condenser. The corrosion and subsequent mass transfer resulting from the use of Hg as the thermodynamic wo:king fluid are important considerations in the selection of materials for the SNAP II System. Consequently, corrosion and mass transfer behavior were under study for the past three years. Recent results of this study are presented and the corrosion mechanisms involved are discussed. (auth)

Nejedlik, J.F.

1961-04-10T23:59:59.000Z

272

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

the United States” The Electricity Journal. Vol 20, Issue 9,s Contribution to U.S. Electricity Supply. DOE/GO-102008-Value of Wind- Generated Electricity in California and the

Bolinger, Mark A

2009-01-01T23:59:59.000Z

273

Grid Impacts of Wind Power Variability: Recent Assessments from a Variety of Utilities in the United States (Presentation)  

DOE Green Energy (OSTI)

Presentation for the European Wind Energy Conference held February 27--March 2, 2006, in Athens, Greece, showing grid impacts of wind power variability.

Parsons, B.

2006-03-01T23:59:59.000Z

274

A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States  

E-Print Network (OSTI)

own challenges. 9 The Internal Revenue Service will considerlimited For example, the Internal Revenue Code requires thatPower Price Revenue Shortfall After-Tax Internal Rate of

Bolinger, Mark; Wiser, Ryan

2004-01-01T23:59:59.000Z

275

Wrong Unit, Train, and Component Events at U.S. Nuclear Power Plants: Joint EPRI-CRIEPI Human Factors Studies  

Science Conference Proceedings (OSTI)

Significant human-related errors can occur when plant personnel perform activities on a wrong unit, train, or component. Such errors can result in costly adverse events such as safety system actuations, technical specification violations, failure of multiple safety trains, and reactor trips. This report investigates the wrong unit, train, component (WUTC) phenomena, providing an assessment of the current state of WUTC events as well as possible interventions for reducing errors.

1995-01-24T23:59:59.000Z

276

Material Sustainability Issues for the North American Electric Power Industry: Results of Research with Electric Power Companies and Stakeholders in the United States and Canada  

Science Conference Proceedings (OSTI)

This report presents results of research regarding sustainability issues faced by the electric power industry. Specifically, the research effort was directed toward identifying which sustainability issues affecting the power companies in North America are considered to be the most relevant, or material, and gathering perspectives on those issues from the industry and its stakeholders.The research team collected information from three sources: direct interviews with utility managers and ...

2013-04-25T23:59:59.000Z

277

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

278

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

279

Estimates of power requirements for a manned Mars rover powered by a nuclear reactor  

Science Conference Proceedings (OSTI)

This paper assesses the power requirement for a Manned Mars Rover vehicle. Auxiliary power needs are fulfilled using a hybrid solar photovoltaic/regenerative fuel cell system while the primary power needs are met using an SP?100 type reactor. The primary electric power needs

Nicholas J. Morley; Mohamed S. El?Genk; Robert Cataldo; Harvey Bloomfield

1991-01-01T23:59:59.000Z

280

Large-Scale Offshore Wind Power in the United States: Assessment of Opportunities and Barriers, NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT OF ASSESSMENT OF OPPORTUNITIES AND BARRIERS September 2010 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

United States Government or any agency thereof. TMDL Impacts on Coal-Fired Power Plants Page 3  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed therein do not necessarily state or reflect those of the

unknown authors

2010-01-01T23:59:59.000Z

282

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

283

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

E-Print Network (OSTI)

Power to Develop a 600 MW Wind Farm in Texas. ” October 29,to- develop-a-600-mw-wind-farm-in-texas Council of EconomicStimulus Funds Sought By Wind Farm Project With Parts Built

Bolinger, Mark

2012-01-01T23:59:59.000Z

284

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

E-Print Network (OSTI)

2002) Economic Impacts of Wind Power in Kittitas County, WA.Beck, D. (2004) How Hull Wind "I" Impacted Property Valuesof Visual Impact: The Case of Wind Turbines. Environment and

Hoen, Ben

2010-01-01T23:59:59.000Z

285

Comparative analysis of United States and French nuclear power plant siting and construction regulatory policies and their economic consequences  

E-Print Network (OSTI)

Despite the substantial commitments of time and money which are devoted to the nuclear power plant siting process, the effectiveness of the system in providing a balanced evaluation of the technical, environmental and ...

Golay, Michael Warren.

1977-01-01T23:59:59.000Z

286

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

the Greenhouse: Divergent Trends in Federal, Regional, Statewind cost and pricing trends (see, e.g. , Ibenholt, 2002;Bolinger, Mark. 2008. “Trends in U.S. Wind Power Prices and

Bolinger, Mark A

2009-01-01T23:59:59.000Z

287

Wind Power Price Trends in the United States: Struggling to Remain Competitive in the Face of Strong Growth  

E-Print Network (OSTI)

cost (and price) of energy delivered from a wind project.wind turbines has increased due to higher commodity (materials and energy) prices, andwind power, cost trends, price trends 1.0 Introduction Driven by concerns over climate and energy

Bolinger, Mark A

2009-01-01T23:59:59.000Z

288

PTC, ITC, or Cash Grant? An Analysis of the Choice Facing Renewable Power Projects in the United States  

E-Print Network (OSTI)

Golden, CO: National Renewable Energy Laboratory. Harper,Stimulus Bill Will Affect Renewable Power Projects. BriefingNREL/TP-6A2-45359 National Renewable Energy Laboratory PTC,

Bolinger, Mark

2009-01-01T23:59:59.000Z

289

GOTHIC Analysis of Containment Fan Cooler Unit (CFCU) Cooling Water Response Following a LOCA with Loss of Offsite Power  

Science Conference Proceedings (OSTI)

This report presents a simplified method to predict the thermal hydraulic status of a containment fan cooling system under a loss of coolant accident (LOCA) with loss of off-site power (LOOP). GOTHIC 5.0c, a general purpose thermal hydraulics computer program for analysis of nuclear power plants and confinements buildings, has been used for the calculation, and the results have been compared with those from RETRAN.

1997-12-23T23:59:59.000Z

290

Turbine-Generator Auxiliary Systems, Volume 2: Turbine Steam Seal System Maintenance Guide  

Science Conference Proceedings (OSTI)

The Turbine-Generator Auxiliary Systems, Volume 2: Turbine Steam Seal System Maintenance Guide provides nuclear and fossil plant personnel with operation and maintenance guidance on the turbine steam seal system components.

2006-12-14T23:59:59.000Z

291

Hydro Life Extension Modernization Guides: Volumes 4 and 5: Auxiliary Mechanical and Electrical Systems  

Science Conference Proceedings (OSTI)

These guidelines are the fourth and fifth volumes in a series for assessing the needs and benefits and evaluating the cost and economic justification of life extension and modernization alternatives at hydroelectric plants and for implementing the selected plan. They specifically address the plant auxiliary mechanical systems (Volume 4) and auxiliary electrical systems (Volume 5). They also provide a screening procedure and criteria to enable utility personnel to identify where there are opportunities fo...

2001-12-17T23:59:59.000Z

292

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

293

Adjusting to Overcapacity: Impacts of New Gas-Fired Units on Power Supply and Fuel Use: Report Series on Natural Gas and Power Relia bility  

Science Conference Proceedings (OSTI)

Capacity additions of gas-fired combined-cycle units reached a peak in 2003 and will drop sharply in 2004. While the extraordinary boom of merchant capacity is now largely over, it has resulted in overbuilding in many regions and will have impacts that are widespread. The overall efficiency of this new capacity has been strong, but trends toward greater capacity utilization have been arrested by the combination of overbuilding and high natural gas prices. Capacity premiums have been driven to low levels,...

2004-03-22T23:59:59.000Z

294

Big Bend Power Station Neural Network-Intelligent Sootblower (NN-ISB) Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Big Bend Power Station neural network- Big Bend Power Station neural network- intelligent SootBlower (nn-iSB) oPtimization (comPleted) Project Description The overall goal of this project was to develop a Neural Network-Intelligent Sootblowing (NN-ISB) system on the 445 MW Tampa Electric Big Bend Unit #2 to initiate sootblowing in response to real-time events or conditions within the boiler rather than relying on general rule-based protocols. Other goals were to increase unit efficiency, reduce NO X , and improve stack opacity. In a coal-fired boiler, the buildup of ash and soot on the boiler tubes can lead to a reduction in boiler efficiency. Thus, one of the most important boiler auxiliary operations is the cleaning of heat-absorbing surfaces. Ash and soot deposits are removed by a process known as sootblowing, which uses mechanical devices for on-line cleaning

295

Strategic Activities to Address Material Sustainability Issues in the Electric Power Industry: Results of Research with Electric Power Companies and Stakeholders in the United States and Canada  

Science Conference Proceedings (OSTI)

This report discusses activities that electric utilities can take to address the 15 key “material” sustainability issues that were identified in Material Sustainability Issues for the North American Electric Power Industry (EPRI report 3002000920). This report adds insight to that previous analysis by considering activities and actions for addressing the 15 material sustainability issues. Overall, the research identified 145 possible activities across all 15 material issues, and ...

2013-12-03T23:59:59.000Z

296

Analysis of core damage frequency: Nuclear power plant Dukovany, VVER/440 V-213 Unit 1, internal events. Volume 1: Main report  

SciTech Connect

This report presents the final results from the Level 1 probabilistic safety assessment (PSA) for the Dukovany VVER/440 V-213 nuclear power plant, Unit 1. Section 1.1 describes the objectives of this study. Section 1.2 discusses the approach that was used for completing the Dukovany PSA. Section 1.3 summarizes the results of the PSA. Section 1.4 provides a comparison of the results of the Dukovany PSA with the results of other PSAs for different types of reactors worldwide. Section 1.5 summarizes the conclusions of the Dukovany PSA.

Pugila, W.J.

1994-12-21T23:59:59.000Z

297

AN ESSENTIAL INDUSTRY AT THE CROSSROADS: DEREGULATION, RESTRUCTURING, AND A NEW MODEL FOR THE UNITED STATES ’ BULK POWER SYSTEM  

E-Print Network (OSTI)

All materials contained within this document are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published or broadcast without the prior written permission of the author. You may not alter or remove any trademark, copyright or other notice from copies of the content. You may download this material, after contacting the author, for your personal, noncommercial use only. For questions, further information or comments, please send to:

Copyright Jeffrey; Thomas Hein; All Rights Reserved; Mr. Jeffrey T. Hein (jeff; Jeffrey Thomas Hein

2003-01-01T23:59:59.000Z

298

Power Plant Profitability and Investment in the Central United States: Impact of New Gas Capacity on Generation and Repowering Economics  

Science Conference Proceedings (OSTI)

Over the past 12 months, announcements of capacity additions by 2005 in the midwest have jumped from 20,000 to 60,000 MW. This report examines how just a portion of this capacity, if built, could affect the profitability of new and existing power plants.

2000-12-11T23:59:59.000Z

299

Wind Farm Power Fluctuations, Ancillary Services, and System Operating Impact Analysis Activities in the United States: Preprint  

SciTech Connect

With ever increasing penetration of wind capacity and growing interest in wind power by electric utilities and other power providers, questions about the impacts and costs associated with maintaining a stable grid is receiving lots of attention. These issues are important, both in competitive and regulated monopoly markets.To evaluate the range of ancillary service impact of wind power plants, wind power plant output fluctuations on the order of seconds to minutes must be known. However, the data required for a credible analysis has not been widely available. The National Renewable Energy Laboratory (NREL), through its own efforts, and in conjunction with a wide group of stakeholders including other national labs, consultants, developers, utilities, and the non-profit Utility Wind Interest Group, has initiated measurement and analysis activities. The efforts are ongoing. While final system-cost results are not available, this paper will describe the progress to date and present typical results and statistical analysis. In addition, methods will be explained with the aim of soliciting feedback from others looking at similar issues worldwide.

Parsons, B. K. (National Renewable Energy Laboratory); Wan, Y. (National Renewable Energy Laboratory); Kirby, B. (Oak Ridge National Laboratory)

2001-07-01T23:59:59.000Z

300

CRADA Final Report for CRADA Number ORNL98-0521 : Development of an Electric Bus Inverter Based on ORNL Auxiliary Resonant Tank (ART) Soft-Switching Technology  

SciTech Connect

The Power Electronics and Electric Machinery Research Center (PEEMRC) of Oak Ridge National Laboratory (ORNL) has for many years been developing technologies for power converters for motor drives and many other applications. Some of the research goals are to improve efficiency and reduce audible and electromagnetic interference noise generation for inverters and the driven loads. The converters are being required to produce more power with reduced weight and volume, which requires improvements in heat removal from the electronics, as well as improved circuit designs that have fewer electrical losses. PEEMRC has recently developed and patented a soft-switching inverter topology called an Auxiliary Resonant Tank (ART), and this design has been tested and proven at ORNL using a 10-kW laboratory prototype. The objective of this project was to develop, test, and install the ART inverter technology in an electric transit bus with the final goal of evaluating performance of the ORNL inverter under field conditions in a vehicle. A scaled-up inverter with the capacity to drive a 22-e bus was built based on the 10-kW ORNL laboratory prototype ART soft-switching inverter. Most (if not all) commercially available inverters for traction drive and other applications use hard-switching inverters. A Cooperative Research and Development Agreement was established with the Chattanooga Area Regional Transit Authority (CARTA), the Electric Transit Vehicle Institute (ETVI), and Advanced Vehicle Systems (AVS), all of Chattanooga, along with ORNL. CARTA, which maintains and operates the public transit system in Chattanooga, provided an area for testing the vehicle alongside other similar vehicles in the normal operating environment. ETVI offers capabilities in standardized testing and reporting and also provides exposure in the electric transit vehicle arena for ORNL's technologies. The third Chattanooga partner, (AVS) manufactures all-electric and hybrid electric transit buses using inverter drive systems from several manufacturers. AVS provided help in field installation, and parts for laboratory testing. A 100-kW field-ready unit was developed, tested in an ORNL laboratory, and installed and successfully operated in a CARTA bus in Chattanooga. The tests on the vehicle were performed at a CARTA maintenance facility and at a l-mile test track in Chattanooga managed by CARTA.

Ayers, C.W.

2001-05-08T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants  

DOE Green Energy (OSTI)

Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

Douglas G. Hall

2006-01-01T23:59:59.000Z

302

Draft audit report, human factors engineering control room design review: Saint Lucie Nuclear Power Plant, Unit No. 2  

SciTech Connect

A human factors engineering preliminary design review of the Saint Lucie Unit 2 control room was performed at the site on August 3 through August 7, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The review team included human factors consultants from BioTechnology, Inc., Falls Church, Virginia, and from Lawrence Livermore National Laboratory (University of California), Livermore, California.

Peterson, L.R.; Lappa, D.A.; Moore, J.W.

1981-09-03T23:59:59.000Z

303

Generating capacity of the united power system of Russia and conditions of fuel supply to electric power plants for the period up to 2020  

SciTech Connect

Prospects of development of the energy economy in Russia are considered up to 2020. The proportion of thermal power plants (TPP) in the structure of the generating capacity of Russia amounts to about 70% (147 mln kW). The proportion of gas in the structure of fuel consumed by TPP amounts to 64%. It is predicted that the fraction of high-quality kinds of fuel (gas and fuel oil) will decrease in the considered period due to maximum involvement of coal in the fuel balance and wider use of combined-cycle and gas-turbine technologies that provide a lower specific consumption of fuel. It is planned to resort to advanced technologies both for reconstructing existing plants and erecting new ones. This paper deals with problems of fuel supply of fossil-fuel-fired thermal power plants in the light of the evolution of the energy economy of Russia. The demand of TPP for different kinds of fossil fuel, i.e., gas, coal, and fuel oil, is estimated for the whole of the country and for its regions according to two variants of development of the generating capacity with planned commissioning of combined-cycle plants with a total output of 32 mln kW and gas-turbine plants with a total output of 61 mln kW in the period of up to 2020. The tasks of the fuel policy to be solved in the considered period are presented.

V.I. Chemodanov; N.V. Bobyleva; N.G. Chelnokova; N.Yu. Sokolova [Energoset'proekt Institute, Moscow (Russian Federation)

2002-05-15T23:59:59.000Z

304

Estimating the Capacity Value of Concentrating Solar Power Plants: A Case Study of the Southwestern United States  

Science Conference Proceedings (OSTI)

We estimate the capacity value of concentrating solar power (CSP) plants without thermal energy storage in the southwestern U.S. Our results show that CSP plants have capacity values that are between 45% and 95% of maximum capacity, depending on their location and configuration. We also examine the sensitivity of the capacity value of CSP to a number of factors and show that capacity factor-based methods can provide reasonable approximations of reliability-based estimates.

Madaeni, S. H.; Sioshansi, R.; Denholm, P.

2012-05-01T23:59:59.000Z

305

Grid Impacts of Wind Power Variability: Recent Assessments from a Variety of Utilities in the United States; Preprint  

SciTech Connect

Because of wind power's unique characteristics, many concerns are based on the increased variability that wind contributes to the grid, and most U.S. studies have focused on this aspect of wind generation. Grid operators are also concerned about the ability to predict wind generation over several time scales. In this report, we quantify the physical impacts and costs of wind generation on grid operations and the associated costs.

Parsons, B.; Milligan, M.; Smith, J. C.; DeMeo, E.; Oakleaf, B.; Wolf, K.; Schuerger, M.; Zavadil, R.; Ahlstrom, M.; Nakafuji, D. Y.

2006-07-01T23:59:59.000Z

306

Grid Impacts of Wind Power Variability: Recent Assessments from a Variety of Utilities in the United States; Preprint  

DOE Green Energy (OSTI)

Because of wind power's unique characteristics, many concerns are based on the increased variability that wind contributes to the grid, and most U.S. studies have focused on this aspect of wind generation. Grid operators are also concerned about the ability to predict wind generation over several time scales. In this report, we quantify the physical impacts and costs of wind generation on grid operations and the associated costs.

Parsons, B.; Milligan, M.; Smith, J. C.; DeMeo, E.; Oakleaf, B.; Wolf, K.; Schuerger, M.; Zavadil, R.; Ahlstrom, M.; Nakafuji, D. Y.

2006-07-01T23:59:59.000Z

307

Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States  

SciTech Connect

This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

2010-05-05T23:59:59.000Z

308

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

309

Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1  

Science Conference Proceedings (OSTI)

This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

1995-10-01T23:59:59.000Z

310

Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America  

SciTech Connect

The purpose of this document is to describe approaches and methods for estimation of the design-basis flood at nuclear power plant sites. Chapter 1 defines the design-basis flood and lists the U.S. Nuclear Regulatory Commission's (NRC) regulations that require estimation of the design-basis flood. For comparison, the design-basis flood estimation methods used by other Federal agencies are also described. A brief discussion of the recommendations of the International Atomic Energy Agency for estimation of the design-basis floods in its member States is also included.

Prasad, Rajiv; Hibler, Lyle F.; Coleman, Andre M.; Ward, Duane L.

2011-11-01T23:59:59.000Z

311

Development of a Laboratory Verified Single-Duct VAV System Model with Fan Powered Terminal Units Optimized Using Computational Fluid Dynamics  

E-Print Network (OSTI)

Single Duct Variable Air Volume (SDVAV) systems use series and parallel Fan Powered Terminal Units to control the air flow in conditioned spaces. This research developed a laboratory verified model of SDVAV systems that used series and parallel fan terminal units where the fan speeds were controlled by either Silicon Controlled Rectifiers (SCR) or Electronically Commutated Motors (ECM) motors. As part of the research, the model was used to compare the performance of the systems and to predict the harmonics generated by ECM systems. All research objectives were achieved. The CFD model, which was verified with laboratory measurements, showed the potential to identify opportunities for improvement in the design of the FPTU and accurately predicted the static pressure drop as air passed through the unit over the full operating range of the FPTU. Computational fluid dynamics (CFD) models of typical a FPTU were developed and used to investigate opportunities for optimizing the design of FPTUs. The CFD model identified key parameters required to conduct numerical simulations of FPTU and some of the internal components used to manufacture the units. One key internal component was a porous baffle used to enhance mixing when primary air and induced air entered the mixing chamber. The CFD analysis showed that a pressure-drop based on face velocity model could be used to accurately predict the performance of the FPTU. The SDVAV simulation results showed that parallel FPTUs used less energy overall than series systems that used SCR motors as long as primary air leakage was not considered. Simulation results also showed that series ECM FPTUs used about the same amount of energy, within 3 percent, of parallel FPTU even when leakage was not considered. A leakage rate of 10 percent was enough to reduce the performance of the parallel FPTU to the level of the series SCR system and the series ECM FPTUs outperformed the parallel FPTUs at all weather locations used in the study.

Davis, Michael A.

2010-08-01T23:59:59.000Z

312

Analysis of the working process and mechanical losses in a Stirling engine for a solar power unit  

SciTech Connect

In this paper a second level mathematical model for the computational simulation of the working process of a 1-kW Stirling engine has been used and the results obtained are presented. The internal circuit of the engine in the calculation scheme was divided into five chambers, namely, the expansion space, heater, regenerator, cooler and the compression space, and the governing system of ordinary differential equations for the energy and mass conservation were solved in each chamber by Euler`s method. In addition, mechanical losses in the construction of the engine have been determined and the computational results show that the mechanical losses for this particular design of the Stirling engine may be up to 50% of the indicated power of the engine.

Makhkamov, K.K. [Uzbek Academy of Sciences, Tashkent (Uzbekistan). Physical and Technical Inst.; Ingham, D.B. [Univ. of Leeds (United Kingdom). Dept. of Applied Mathematics

1999-05-01T23:59:59.000Z

313

Unit Conversion  

Science Conference Proceedings (OSTI)

Unit Conversion. ... Unit Conversion Example. "If you have an amount of unit of A, how much is that in unit B?"; Dimensional Analysis; ...

2012-12-04T23:59:59.000Z

314

Essential Power Systems Workshop - OEM Perspective  

DOE Green Energy (OSTI)

In California, idling is largely done for climate control. This suggests that climate control devices alone could be used to reduce idling. Line-haul truck drivers surveyed require an average of 4-6 kW of power for a stereo, CB radio, light, refrigerator, and climate control found in the average truck. More power may likely be necessary for peak power demands. The amount of time line-haul trucks reported to have stopped is between 25 and 30 hours per week. It was not possible to accurately determine from the pilot survey the location, purpose, and duration of idling. Consulting driver logs or electronically monitoring trucks could yield more accurate data, including seasonal and geographic differences. Truck drivers were receptive to idling alternatives. Two-thirds of truck drivers surveyed support a program to reduce idling. Two-thirds of drivers reported they would purchase idling reduction technologies if the technology yielded a payback period of two years or less. Willingness to purchase auxiliary power units appears to be higher for owner-operators than for company drivers. With a 2-year payback period, 82% of owner- operators would be willing to buy an idle- reducing device, while 63% of company drivers thought their company would do the same. Contact with companies is necessary to discern whether this difference between owner- operators and companies is true or simply due to the perception of the company drivers. Truck stops appear to be a much more attractive option for electrification than rest areas by a 48% to 21% margin. Much of this discrepancy may be due to perceived safety problems with rest areas. This survey did not properly differentiate between using these areas for breaks or overnight. The next, full survey will quantify where the truck drivers are staying overnight, where they go for breaks, and the duration of time they spend at each place. The nationwide survey, which is in progress, will indicate how applicable the results are to the US in general. In addition to the survey, we believe data loggers and focus groups will be necessary to collect the idling duration and location data necessary to compare auxiliary power units to truck stop electrification. Focus groups are recommended to better understand the driver response to APUs and electrification. The appearance and perception of the new systems will need further clarification, which could be accomplished with a demonstration for truck drivers.

Bill Gouse

2001-12-12T23:59:59.000Z

315

Arm-length stabilisation for interferometric gravitational-wave detectors using frequency-doubled auxiliary lasers  

E-Print Network (OSTI)

Residual motion of the arm cavity mirrors is expected to prove one of the principal impediments to systematic lock acquisition in advanced gravitational-wave interferometers. We present a technique which overcomes this problem by employing auxiliary lasers at twice the fundamental measurement frequency to pre-stabilise the arm cavities' lengths. Applying this approach, we reduce the apparent length noise of a 1.3 m long, independently suspended Fabry-Perot cavity to 30 pm rms and successfully transfer longitudinal control of the system from the auxiliary laser to the measurement laser.

Mullavey, Adam J; Miller, John; Evans, Matthew; Fritschel, Peter; Sigg, Daniel; Waldman, Sam J; Shaddock, Daniel A; McClelland, David E

2011-01-01T23:59:59.000Z

316

Arm-length stabilisation for interferometric gravitational-wave detectors using frequency-doubled auxiliary lasers  

E-Print Network (OSTI)

Residual motion of the arm cavity mirrors is expected to prove one of the principal impediments to systematic lock acquisition in advanced gravitational-wave interferometers. We present a technique which overcomes this problem by employing auxiliary lasers at twice the fundamental measurement frequency to pre-stabilise the arm cavities' lengths. Applying this approach, we reduce the apparent length noise of a 1.3 m long, independently suspended Fabry-Perot cavity to 30 pm rms and successfully transfer longitudinal control of the system from the auxiliary laser to the measurement laser.

Adam J. Mullavey; Bram J. J. Slagmolen; John Miller; Matthew Evans; Peter Fritschel; Daniel Sigg; Sam J. Waldman; Daniel A. Shaddock; David E. McClelland

2011-12-14T23:59:59.000Z

317

Dual power, constant speed electric motor system  

DOE Patents (OSTI)

A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level.

Kirschbaum, Herbert S. (Asheville, NC)

1984-01-01T23:59:59.000Z

318

Dual power, constant speed electric motor system  

DOE Patents (OSTI)

A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level. 6 figs.

Kirschbaum, H.S.

1984-07-31T23:59:59.000Z

319

Fuel Cell Housing for Rapid Start-Up Auxiliary Power and Gas ...  

The fuel cells also survived instantaneous heating rates of over ... The cell holder consists of a stainless steel casing with window ... Applications and Industries.

320

The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis  

Science Conference Proceedings (OSTI)

With wind energy expanding rapidly in the U.S. and abroad, and with an increasing number of communities considering wind power development nearby, there is an urgent need to empirically investigate common community concerns about wind project development. The concern that property values will be adversely affected by wind energy facilities is commonly put forth by stakeholders. Although this concern is not unreasonable, given property value impacts that have been found near high voltage transmission lines and other electric generation facilities, the impacts of wind energy facilities on residential property values had not previously been investigated thoroughly. The present research collected data on almost 7,500 sales of singlefamily homes situated within 10 miles of 24 existing wind facilities in nine different U.S. states. The conclusions of the study are drawn from eight different hedonic pricing models, as well as both repeat sales and sales volume models. The various analyses are strongly consistent in that none of the models uncovers conclusive evidence of the existence of any widespread property value impacts that might be present in communities surrounding wind energy facilities. Specifically, neither the view of the wind facilities nor the distance of the home to those facilities is found to have any consistent, measurable, and statistically significant effect on home sales prices. Although the analysis cannot dismiss the possibility that individual homes or small numbers of homes have been or could be negatively impacted, it finds that if these impacts do exist, they are either too small and/or too infrequent to result in any widespread, statistically observable impact.

Hoen, Ben; Wiser, Ryan; Cappers, Peter; Thayer, Mark; Sethi, Gautam

2009-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

united stadium. united station.  

E-Print Network (OSTI)

??DC United is one of Major League Soccerâs most decorated franchises, yet it still plays its home games within the crumbling confines of RFK Stadium.… (more)

Groff, David R.

2011-01-01T23:59:59.000Z

322

Community-Owned wind power development: The challenge of applying the European model in the United States, and how states are addressing that challenge  

E-Print Network (OSTI)

Bolinger, M. 2001. Community Wind Power Ownership Schemes infor Communities to Facilitate Wind Power Plant Projects. ”at 2003 Oklahoma Wind Power and Bioenergy Conference, June

Bolinger, Mark

2004-01-01T23:59:59.000Z

323

Rigorous Kinetic Modeling, Optimization, and Operability Studies of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture  

Science Conference Proceedings (OSTI)

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

Jones, Dustin; Bhattacharyya, Debangsu; Turton, Richard; Zitney, Stephen E

2011-12-15T23:59:59.000Z

324

Rigorous Kinetic Modeling and Optimization Study of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture  

SciTech Connect

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

Jones, Dustin; Bhattacharyya, Debangsu; Turton, Richard; Zitney, Stephen E.

2012-02-08T23:59:59.000Z

325

C. A. La Electricidad de Caracas: Feasibility-study definitional report. Arreciffs Units 1 through 5 repowering project, electric power generation expansion Venezuela thermal power plant. Export trade information  

SciTech Connect

C.A. La Electricidad de Caracas (E.de C.) is a private company which in 1991 served some 830,000 customers in an area of 4,160 square kilometers surrounding Caracas. A program is underway by E.de C. for upgrading equipment and expanding the capacity of several of its existing generating facilities. The Arrecifes repowering project will involve the addition of about 330 MW of new natural gas fired gas turbine generators and heat recovery steam generators (HRSGs) to five existing thermal power units built 30 to 40 years ago which have steam turbine generator sets of 26 to 41 MW each. The existing steam boilers will be removed. The limited but seemingly sufficient space available is to be a primary focus of the feasibility study.

Not Available

1991-05-01T23:59:59.000Z

326

iCon: utilizing everyday objects as additional, auxiliary and instant tabletop controllers  

Science Conference Proceedings (OSTI)

This work describes a novel approach to utilizing everyday objects of users as additional, auxiliary, and instant tabletop controllers. Based on this approach, a prototype platform, called iCon, is developed to explore the possible design. Field studies ... Keywords: everyday object, tabletop controller, tangible user interface

Kai-Yin Cheng; Rong-Hao Liang; Bing-Yu Chen; Rung-Huei Laing; Sy-Yen Kuo

2010-04-01T23:59:59.000Z

327

Hoechst plans Mexican unit  

SciTech Connect

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

328

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

329

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

330

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

331

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network (OSTI)

demand, and operating constraints such as spinning reserve requirements, over a short time horizon of power unit i is generating in time period t pmin i pmax i : minimum maximum rated capacity of unit i rmax i : maximum reserve for unit i ripit : reserve available from unit i in time period t minrmax i

332

Release of radionuclides and chelating agents from cement-solidified decontamination low-level radioactive waste collected from the Peach Bottom Atomic Power Station Unit 3  

SciTech Connect

As part of a study being performed for the Nuclear Regulatory Commission (NRC), small-scale waste-form specimens were collected during a low oxidation-state transition-metal ion (LOMI)-nitric permanganate (NP)-LOMI solidification performed in October 1989 at the Peach Bottom Atomic Power Station Unit 3. The purpose of this program was to evaluate the performance of cement-solidified decontamination waste to meet the low-level waste stability requirements defined in the NRC`s ``Technical Position on Waste Form,`` Revision 1. The samples were acquired and tested because little data have been obtained on the physical stability of actual cement-solidified decontamination ion-exchange resin waste forms and on the leachability of radionuclides and chelating agents from those waste forms. The Peach Bottom waste-form specimens were subjected to compressive strength, immersion, and leach testing in accordance with the NRC`s ``Technical Position on Waste Form,`` Revision 1. Results of this study indicate that the specimens withstood the compression tests (>500 psi) before and after immersion testing and leaching, and that the leachability indexes for all radionuclides, including {sup 14}C, {sup 99}{Tc}, and {sup 129}I, are well above the leachability index requirement of 6.0, required by the NRC`s ``Technical Position on Waste Form,`` Revision 1.

Akers, D.W.; Kraft, N.C.; Mandler, J.W. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1994-03-01T23:59:59.000Z

333

Southwestern Power Administration One West...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the United States Department of Energy Southwestern Power Administration Strategic Plan March 2013 Administrator's Message The Southwestern Power Administration powers the...

334

Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy  

SciTech Connect

Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

Savage, N.; Graban, W.

1979-12-01T23:59:59.000Z

335

FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004)  

SciTech Connect

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963.

Erika Bailey

2011-07-07T23:59:59.000Z

336

Dual to ratio-cumproduct estimator using known parameters of auxiliary variables  

E-Print Network (OSTI)

This paper deals with the dual to ratio-cum-product estimator for population mean using known parameters of auxiliary variables. In this paper, dual to ratio-cum-product estimator of Singh and Tailor (2005) has been suggested. The Bias and mean squared error expressions have also been obtained up to the first degree of approximation. Suggested estimator has been compared theoretically as well as empirically.

Rajesh Tailor; Ritesh Tailor; Rajesh Parmar; Manish Kumar

2012-01-01T23:59:59.000Z

337

Mitigation of Human Operational Errors Involving Control, Relay, and Auxiliary Equipment  

Science Conference Proceedings (OSTI)

This report describes the objectives and current status of a research effort related to human operational errors involving control, relay, and auxiliary equipment. This research is conducted by the Switching Safety and Reliability Project of EPRI's Substations Program. The report describes the data collection process for three ongoing studies on the above-named subject, and preliminary findings based on data collected from participating utilities by the end of November 2005. The project is expected to be...

2005-12-23T23:59:59.000Z

338

Short-Term Shutdown Guidance for Steam Turbine-Generators and Auxiliary Systems  

Science Conference Proceedings (OSTI)

This report provides guidelines on the methods that utilities should consider to protect operating equipment when it is removed from service for short periods of time. The equipment and systems considered in this report include the steam turbine, generator, exciter, feedwater heaters, and related auxiliaries. The timeframe for this report includes outage periods from a weekend to six months. Improper layup can cause long-term equipment damage and premature failure. Increased shutdown frequency and durati...

2010-11-12T23:59:59.000Z

339

Detection of facilities in satellite imagery using semi-supervised image classification and auxiliary contextual observables  

SciTech Connect

Detecting complex targets, such as facilities, in commercially available satellite imagery is a difficult problem that human analysts try to solve by applying world knowledge. Often there are known observables that can be extracted by pixel-level feature detectors that can assist in the facility detection process. Individually, each of these observables is not sufficient for an accurate and reliable detection, but in combination, these auxiliary observables may provide sufficient context for detection by a machine learning algorithm. We describe an approach for automatic detection of facilities that uses an automated feature extraction algorithm to extract auxiliary observables, and a semi-supervised assisted target recognition algorithm to then identify facilities of interest. We illustrate the approach using an example of finding schools in Quickbird image data of Albuquerque, New Mexico. We use Los Alamos National Laboratory's Genie Pro automated feature extraction algorithm to find a set of auxiliary features that should be useful in the search for schools, such as parking lots, large buildings, sports fields and residential areas and then combine these features using Genie Pro's assisted target recognition algorithm to learn a classifier that finds schools in the image data.

Harvey, Neal R [Los Alamos National Laboratory; Ruggiero, Christy E [Los Alamos National Laboratory; Pawley, Norma H [Los Alamos National Laboratory; Brumby, Steven P [Los Alamos National Laboratory; Macdonald, Brian [Los Alamos National Laboratory; Balick, Lee [Los Alamos National Laboratory; Oyer, Alden [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

340

Sensor placement algorithm development to maximize the efficiency of acid gas removal unit for integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture  

Science Conference Proceedings (OSTI)

Future integrated gasification combined cycle (IGCC) power plants with CO{sub 2} capture will face stricter operational and environmental constraints. Accurate values of relevant states/outputs/disturbances are needed to satisfy these constraints and to maximize the operational efficiency. Unfortunately, a number of these process variables cannot be measured while a number of them can be measured, but have low precision, reliability, or signal-to-noise ratio. In this work, a sensor placement (SP) algorithm is developed for optimal selection of sensor location, number, and type that can maximize the plant efficiency and result in a desired precision of the relevant measured/unmeasured states. In this work, an SP algorithm is developed for an selective, dual-stage Selexol-based acid gas removal (AGR) unit for an IGCC plant with pre-combustion CO{sub 2} capture. A comprehensive nonlinear dynamic model of the AGR unit is developed in Aspen Plus Dynamics® (APD) and used to generate a linear state-space model that is used in the SP algorithm. The SP algorithm is developed with the assumption that an optimal Kalman filter will be implemented in the plant for state and disturbance estimation. The algorithm is developed assuming steady-state Kalman filtering and steady-state operation of the plant. The control system is considered to operate based on the estimated states and thereby, captures the effects of the SP algorithm on the overall plant efficiency. The optimization problem is solved by Genetic Algorithm (GA) considering both linear and nonlinear equality and inequality constraints. Due to the very large number of candidate sets available for sensor placement and because of the long time that it takes to solve the constrained optimization problem that includes more than 1000 states, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. In this presentation, we will share our experience in setting up parallel computing using GA in the MATLAB® environment and present the overall approach for achieving higher computational efficiency in this framework.

Paul, P.; Bhattacharyya, D.; Turton, R.; Zitney, S.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Copper Heat Exchanger for the External Auxiliary Bus-Bars Routing Line in the LHC Insertion Regions  

E-Print Network (OSTI)

The corrector magnets and the main quadrupoles of the LHC dispersion suppressors are powered by a special superconducting line (called auxiliary bus-bars line N), external to the cold mass and housed in a 50 mm diameter stainless steel tube fixed to the cold mass. As the line is periodically connected to the cold mass, the same gaseous and liquid helium cools both the magnets and the line. The final sub-cooling process (from around 4.5 K down to 1.9 K) consists in the phase transformation from liquid to superfluid helium. Heat is extracted from the line through the magnets via their point of junction. In dispersion suppressor zones, approximately 40 m long, the sub-cooling of the line is slightly delayed with respect to the magnets. This might have an impact on the readiness of the accelerator for operation. In order to accelerate the process, a special heat exchanger has been designed. It is located in the middle of the dispersion suppressor portion of the line. Its main function consists in providing a loca...

Garion, C; Seyvet, F; Sitko, M; Skoczen, B; Tock, J P

2006-01-01T23:59:59.000Z

342

Heavy Vehicle Essential Power Systems Workshop  

DOE Green Energy (OSTI)

Essential power is a crosscutting technology area that addresses the efficient and practical management of electrical and thermal requirements on trucks. Essential Power Systems: any function on the truck, that is not currently involved in moving the truck, and requires electrical or mechanical energy; Truck Lights; Hotel Loads (HVAC, computers, appliances, lighting, entertainment systems); Pumps, starter, compressor, fans, trailer refrigeration; Engine and fuel heating; and Operation of power lifts and pumps for bulk fluid transfer. Transition from ''belt and gear driven'' to auxiliary power generation of electricity - ''Truck Electrification'' 42 volts, DC and/ or AC; All electrically driven auxiliaries; Power on demand - manage electrical loads; Benefits include: increased fuel efficiency, reduced emission both when truck is idling and moving down the road.

Susan Rogers

2001-12-12T23:59:59.000Z

343

Heavy Vehicle Essential Power Systems Workshop  

SciTech Connect

Essential power is a crosscutting technology area that addresses the efficient and practical management of electrical and thermal requirements on trucks. Essential Power Systems: any function on the truck, that is not currently involved in moving the truck, and requires electrical or mechanical energy; Truck Lights; Hotel Loads (HVAC, computers, appliances, lighting, entertainment systems); Pumps, starter, compressor, fans, trailer refrigeration; Engine and fuel heating; and Operation of power lifts and pumps for bulk fluid transfer. Transition from ''belt and gear driven'' to auxiliary power generation of electricity - ''Truck Electrification'' 42 volts, DC and/ or AC; All electrically driven auxiliaries; Power on demand - manage electrical loads; Benefits include: increased fuel efficiency, reduced emission both when truck is idling and moving down the road.

Susan Rogers

2001-12-12T23:59:59.000Z

344

Economics and policies for carbon capture and sequestration in the western United States : a marginal cost analysis of potential power plant deployment  

E-Print Network (OSTI)

Carbon capture and sequestration (CCS) is a technology that can significantly reduce power sector greenhouse gas (GHG) emissions from coal-fired power plants. CCS technology is currently in development and requires higher ...

Shu, Gary

2010-01-01T23:59:59.000Z

345

Legend Units  

Science Conference Proceedings (OSTI)

... Syntax: LEGEND UNIT units> where is an integer number or parameter in the range 1 to 100 that specifies the legend identifier; and ...

2013-11-27T23:59:59.000Z

346

PBI-Phosphoric Acid Based Membrane Electrode Assemblies: Status...  

NLE Websites -- All DOE Office Websites (Extended Search)

(typically 160 - 180C) and PBI-PA membrane Applications: Stationary power supply, CHP Backup power Auxiliary power units micro-portable Celtec-P: MEAs for High...

347

Community-Owned wind power development: The challenge of applying the European model in the United States, and how states are addressing that challenge  

E-Print Network (OSTI)

Funds Biomass and Innovative Wind Applications. LBNL.Small Distributed Wind Tariff and PPA, www.xcelenergy.com/Bolinger, M. 2001. Community Wind Power Ownership Schemes in

Bolinger, Mark

2004-01-01T23:59:59.000Z

348

Auxiliary Cooling Loads in Passively Cooled Buildings: An Experimental Research Study  

E-Print Network (OSTI)

Currently accepted methods of passive cooling offset only sensible building loads. In the warm, humid southeastern gulf coast climates the latent building load can comprise 35% of the building load in the typical residence. As the sensible load on residences in these climates is reduced or offset by passive cooling techniques, this latent cooling load percentage increases rapidly. In such residences the auxiliary cooling load cannot be effectively met by conventional cooling equipment . The Florida Solar Energy Center (FSEC) is examining the auxiliary cooling requirements of residences in warm, humid climates. The study addresses both the thermal and moisture response of buildings. A total of eight wall systems, three frame wall types and five concrete block wall types are under test at the FSEC Passive Cooling Laboratory (PCL) in Cape Canaveral. Moisture studies involve examination of the absorption and desorption rates of building materials and furnishings and the development of improved moisture migration modeling techniques for inclusion in building energy analysis programs. TARP (Thermal Analysis Research program), developed at NBS by George Walton, and FLOAD, by FCHART Software, have been chosen as the analysis programs with which cooling examined.

Fairey, P.; Vieira, R.; Chandra, S.; Kerestecioglu, A.; Kalaghchy, S.

1984-01-01T23:59:59.000Z

349

The effects of aircraft noise at Williams Air Force Base Auxiliary Field on residential property values  

Science Conference Proceedings (OSTI)

This report considers the environmental consequences of moving the flight training operations of the US Air Force's 82nd Flying Training Wing from the auxiliary airfield, Coolidge-Florence Municipal Airport (CFMA), to a more remote location in Pinal County, Arizona. It examines how actual noise from touch-and-go flights of T-37 aircraft and perceived (anticipated) noise affect the market value of residential property near CFMA. Noise, measured by a noise index, is correlated with market values through a regression analysis applied to a hedonic price model of the Coolidge-Florence housing market. Prices and characteristics of 42 residential properties sold in 1987 and 1988 were used to estimate a perceived noise effect. The report finds that the coefficient on the measure of perceived noise, based on the noise exposure forecast (NEF) index, is statistically insignificant, even though the sign and value are consistent with those estimated in other studies. It concludes that current flights do not have a significant effect on residential property values, partially because there is no housing near CFMA. This and larger studies indicate that flight operations at a new auxiliary airfield would not affect property values if runways were at least 12,000 feet away from housing. 12 refs., 2 tabs.

Morey, M.J.

1990-11-01T23:59:59.000Z

350

1 MW Fuel Cell Project: Test and Evaluation of Five 200 kW Phosphoric Acid Fuel Cell Units Configured as a 1 MW Power Plant  

Science Conference Proceedings (OSTI)

Fuel cell technology can play a potentially significant role as a distributed generation resource at customer facilities. This report describes a demonstration of the new technology that is needed for utility management and control of multiple fuel cell power plants at a single location in an assured power application.

2002-07-10T23:59:59.000Z

351

English Units  

Science Conference Proceedings (OSTI)

English Units. A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: English Units, ... 6, Height of steam point apparatus above ground (ft.), 0, ft. ...

2011-12-22T23:59:59.000Z

352

Unit Conversions  

Science Conference Proceedings (OSTI)

... volume flow units, which contain "atm", assume that the gas is: ideal; at a pressure of 101325 Pa; at a temperature of 0 °C. Be aware that the unit "atm ...

2012-10-02T23:59:59.000Z

353

Microsoft PowerPoint - Vicksburg District Federal Power Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

Vicksburg District Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1...

354

Microsoft PowerPoint - Vicksburg District Federal Power Projects...  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Power Projects Vicksburg District Federal Power Projects Blakely Mountain Hydro DeGray Hydro DeGray Hydro Narrows Hydro Blakely Mountain Rewind Unit 1 ll Rotor...

355

SOLERAS - Solar Cooling Engineering Field Tests Project: United Technologies Research Center. Design guidelines for solar heating/cooling/power generation systems  

Science Conference Proceedings (OSTI)

This report documents the methodology, design guidelines and analytical tools for the preliminary technical/economic evaluation of solar heating/cooling/power generation systems. In particular, it provides the theoretical framework, data bases and software tools for: determining the preliminary economic feasibility of solar-powered configurations compared with grid-supplied electric power and/or competing fossil fuels; selecting the optimum system configuration with respect to solar collector area and ''solar-side'' thermal storage capacity. Implementation of the methodology described in this report can be facilitated by the use of the accompanying IBM PC-compatible computer program ''SOLERAS''. This report represents the final task of the multi-year SOLERAS Program -- jointly sponsored by the US Department of Energy and the King Abdulaziz City for Science and Technology -- which involved the development and field-testing of a solar-powered cooling system in Phoenix, AZ. 11 refs., 37 figs.

Not Available

1987-01-01T23:59:59.000Z

356

Method and apparatus for set point control for steam temperatures for start-up of the turbine and steam generator in unit power plants  

SciTech Connect

A method and apparatus are described for controlling the set point for steam temperatures for cold start-up of a steam generator-turbine unit wherein inlet steam temperature and turbine load absorption are steadily and substantially simultaneously increased in accordance with a predetermined relationship so as to reach their final values substantially synchronously.

Bloch, H.; Salm, M.

1978-05-23T23:59:59.000Z

357

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2  

SciTech Connect

To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

1995-03-01T23:59:59.000Z

358

Control system analysis for off-peak auxiliary heating of passive solar systems  

DOE Green Energy (OSTI)

A computer simulation method is presented for the design of an electrical auxiliary energy system for passive solar heated structures. The system consists of electrical mats buried in the ground underneath the structure. Energy is stored in the ground during utility off-peak hours and released passively to the heated enclosure. An optimal control strategy is used to determine the system design parameters of depth of mat placement and minimum instaled electrical heating capacity. The optimal control applies combinations of fixed duration energy pulses to the heater, which minimize the room temperature error-squared for each day, assuming advance knowledge of the day's weather. Various realizable control schemes are investigated in an attempt to find a system that approaches the performance of the optimal control system.

Murray, H.S.; Melsa, J.L.; Balcomb, J.D.

1980-01-01T23:59:59.000Z

359

Increasing LIGO sensitivity by feedforward subtraction of auxiliary length control noise  

E-Print Network (OSTI)

LIGO, the Laser Interferometer Gravitational-wave Observatory, has been designed and constructed to measure gravitational wave strain via differential arm length. The LIGO 4-km Michelson arms with Fabry-Perot cavities have auxiliary length control servos for suppressing Michelson motion of the beam-splitter and arm cavity input mirrors, which degrades interferometer sensitivity. We demonstrate how a post-facto pipeline called AMPS improves a data sample from LIGO Science Run~6 with feedforward subtraction. Dividing data into 1024-second windows, AMPS numerically fits filter functions representing the frequency-domain transfer functions from Michelson length channels into the gravitational-wave strain data channel for each window, then subtracts the filtered Michelson channel noise (witness) from the strain channel (target). In this paper we describe the algorithm, assess achievable improvements in sensitivity to astrophysical sources, and consider relevance to future interferometry.

Meadors, Grant David; Riles, Keith

2013-01-01T23:59:59.000Z

360

Increasing LIGO sensitivity by feedforward subtraction of auxiliary length control noise  

E-Print Network (OSTI)

LIGO, the Laser Interferometer Gravitational-wave Observatory, has been designed and constructed to measure gravitational wave strain via differential arm length. The LIGO 4-km Michelson arms with Fabry-Perot cavities have auxiliary length control servos for suppressing Michelson motion of the beam-splitter and arm cavity input mirrors, which degrades interferometer sensitivity. We demonstrate how a post-facto pipeline called AMPS improves a data sample from LIGO Science Run~6 with feedforward subtraction. Dividing data into 1024-second windows, AMPS numerically fits filter functions representing the frequency-domain transfer functions from Michelson length channels into the gravitational-wave strain data channel for each window, then subtracts the filtered Michelson channel noise (witness) from the strain channel (target). In this paper we describe the algorithm, assess achievable improvements in sensitivity to astrophysical sources, and consider relevance to future interferometry.

Grant David Meadors; Keita Kawabe; Keith Riles

2013-11-26T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Frozen-orbital and downfolding calculations with auxiliary-field quantum Monte Carlo  

E-Print Network (OSTI)

We describe the implementation of the frozen-orbital and downfolding approximations in the auxiliary-field quantum Monte Carlo (AFQMC) method. These approaches can provide significant computational savings compared to fully correlating all the electrons. While the many-body wave function is never explicit in AFQMC, its random walkers are Slater determinants, whose orbitals may be expressed in terms of any one-particle orbital basis. It is therefore straightforward to partition the full N-particle Hilbert space into active and inactive parts to implement the frozen-orbital method. In the frozen-core approximation, for example, the core electrons can be eliminated in the correlated part of the calculations, greatly increasing the computational efficiency, especially for heavy atoms. Scalar relativistic effects are easily included using the Douglas-Kroll-Hess theory. Using this method, we obtain a way to effectively eliminate the error due to single-projector, norm-conserving pseudopotentials in AFQMC. We also i...

Purwanto, Wirawan; Krakauer, Henry

2013-01-01T23:59:59.000Z

362

The inverse scattering problem at fixed energy based on the Marchenko equation for an auxiliary Sturm-Liouville operator  

E-Print Network (OSTI)

A new approach is proposed to the solution of the quantum mechanical inverse scattering problem at fixed energy. The method relates the fixed energy phase shifts to those arising in an auxiliary Sturm-Liouville problem via the interpolation theory of the Weyl-Titchmarsh m-function. Then a Marchenko equation is solved to obtain the potential.

Palmai, Tamas

2012-01-01T23:59:59.000Z

363

Chatterjee et. al. Page 1 of 13 An auxiliary capacitor based ultra-fast drive circuit for shear  

E-Print Network (OSTI)

frequently require large voltage changes on very short time scales. Since piezos behave electrically stage, and auxiliary capacitor. This circuit can drive piezoelectric motors at higher speeds and lower of nanoscale precision over millimeter ranges of motion, have come into common usage. Although a number

Hudson, Eric

364

Excise Tax Exemption for Solar- or Wind-Powered Systems  

Energy.gov (U.S. Department of Energy (DOE))

Massachusetts law exempts any "solar or wind powered climatic control unit and any solar or wind powered water heating unit or any other type unit or system powered thereby," that qualifies for the...

365

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1  

SciTech Connect

Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

1995-03-01T23:59:59.000Z

366

Community-Owned wind power development: The challenge of applying the European model in the United States, and how states are addressing that challenge  

DOE Green Energy (OSTI)

Local farmers, towns, schools, and individual investors are, however, beginning to invest in wind power. With the help of state policy and clean energy fund support, new federal incentives, and creative local wind developers who have devised ownership structures that maximize the value of both state and federal support, community wind power is beginning to take a foothold in parts of the US, in particular the upper Midwest. The purpose of this report is to describe that foothold, as well as the state support that helped to create it. There are a number of reasons why states are becoming increasingly interested in community wind power. In rural Midwestern states such as Minnesota, Wisconsin, Iowa, and Illinois, community wind is seen as a way to help supplement and stabilize farmer income, and thereby contribute to the preservation of farming communities and the rural landscapes and values they create. In the Northeast, densely populated states such as Massachusetts are turning to community-scale wind development to increase not only the amount of wind power on the grid, but also the public's knowledge, perception, and acceptance of wind power. In still other areas--such as the Pacific Northwest, which is already home to several large wind farms--states are simply responding to strong interest from local constituents who see community wind power as a way to take responsibility for, and mitigate the environmental impact of, electricity generation. But what exactly is ''community wind power''? Definitions vary widely, ranging from behind-the-meter installations to the Danish wind ''cooperatives'' to wind projects owned by municipal utilities. Possible defining criteria include: project size (small vs. large projects); purpose (to offset end-use power consumption vs. to sell power to the grid); ownership (single local vs. multiple local vs. municipal utility vs. commercial owners); and interconnection (behind the meter vs. to the distribution grid vs. to the transmission grid). For the purposes of this report, ''community wind'' is defined as locally owned utility-scale wind development, on either the customer or utility side of the meter. This definition accommodates projects of various sizes (e.g., ranging from single utility-scale turbine installations at Iowa schools all the way up to the 100 MW Trimont project in Minnesota), single or multiple local owners, and perhaps even municipal utilities. In this report, however, municipal utility projects will only be mentioned if specifically funded by a state clean energy fund. Within the confines of this definition, this report first describes state support for, and the status of, community wind in the upper Midwest, including Minnesota, Wisconsin, Iowa, and Illinois. The focus then shifts to the Northeast, where Massachusetts and, to a lesser extent, New York have recently funded community wind initiatives. The report concludes in the western US by briefly describing community wind-related work just getting underway in Oregon and Washington, as well as a few isolated projects in California, Idaho, and on tribal lands.

Bolinger, Mark

2004-03-28T23:59:59.000Z

367

Advances in steam turbine technology for power generation  

SciTech Connect

This book contains articles presented at the 1990 International Joint Power Generation Conference. It is organized under the following headings: Solid particle erosion in steam turbines, Steam turbine failure analysis, Steam turbine upgrades, steam turbine blading development, Boiler feed pumps and auxiliary steam turbine drives.

Bellanca, C.P. (Dayton Power and Light Company (US))

1990-01-01T23:59:59.000Z

368

Secondary steam models of a combined cycle power plant simulator  

Science Conference Proceedings (OSTI)

In this paper, the general description of a full scope simulator for a combined cycle power plant is presented; the antecedents of this work are explained; the basis of the models of the auxiliary and turbine gland steam systems are exposed and some ...

Edgardo J. Roldan-Villasana; Ma. de Jesus Cardoso-Goroztieta; Adriana Verduzco-Bravo; Jorge J. Zorrilla-Arena

2011-04-01T23:59:59.000Z

369

Turbine-Generator Auxiliary Systems, Volume 5: Main and Feedpump Turbine Trip Systems  

Science Conference Proceedings (OSTI)

This report describes the trip systems for the mechanical hydraulic control (MHC) and electrohydraulic control (EHC) main turbine and feedpump turbines for the General Electric (GE) and Siemens Westinghouse (SW) units in the United States.

2009-12-23T23:59:59.000Z

370

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B 1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an

371

Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation (Part A) for the Pilgrim Nuclear Power Station, Unit 1  

Science Conference Proceedings (OSTI)

This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Pilgrim Nuclear Power Station. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system.

White, R.L.

1980-01-01T23:59:59.000Z

372

Enhancing the use of coals by gas reburning-sorbent injection: Volume 4 -- Gas reburning-sorbent injection at Lakeside Unit 7, City Water, Light and Power, Springfield, Illinois. Final report  

Science Conference Proceedings (OSTI)

A demonstration of Gas Reburning-Sorbent Injection (GR-SI) has been completed at a cyclone-fired utility boiler. The Energy and Environmental Research Corporation (EER) has designed, retrofitted and tested a GR-SI system at City Water Light and Power`s 33 MWe Lakeside Station Unit 7. The program goals of 60% NO{sub x} emissions reduction and 50% SO{sub 2} emissions reduction were exceeded over the long-term testing period; the NO{sub x} reduction averaged 63% and the SO{sub 2} reduction averaged 58%. These were achieved with an average gas heat input of 22% and a calcium (sorbent) to sulfur (coal) molar ratio of 1.8. GR-SI resulted in a reduction in thermal efficiency of approximately 1% at full load due to firing natural gas which forms more moisture in flue gas than coal and also results in a slight increase in air heater exit gas temperature. Minor impacts on other areas of unit performance were measured and are detailed in this report. The project at Lakeside was carried out in three phases, in which EER designed the GR-SI system (Phase 1), completed construction and start-up activities (Phase 2), and evaluated its performance with both short parametric tests and a long-term demonstration (Phase 3). This report contains design and technical performance data; the economics data for all sites are presented in Volume 5.

NONE

1996-03-01T23:59:59.000Z

373

Life Cycle Environmental Impacts Resulting from the Manufacture of the Heliostat Field for a Reference Power Tower Design in the United States: Preprint  

SciTech Connect

Life cycle assessment (LCA) is recognized as a useful analytical approach for quantifying environmental impacts of renewable energy technologies, including concentrating solar power (CSP). An LCA accounts for impacts from all stages in the development, operation, and decommissioning of a CSP plant, including such upstream stages as the extraction of raw materials used in system components, manufacturing of those components, and construction of the plant. The National Renewable Energy Laboratory is conducting a series of LCA studies for various CSP technologies. This paper contributes to a thorough LCA of a 100 MWnet molten salt power tower CSP plant by estimating the environmental impacts resulting from the manufacture of heliostats. Three life cycle metrics are evaluated: greenhouse gas emissions, water consumption, and cumulative energy demand. The heliostat under consideration (the 148 m2 Advanced Thermal Systems heliostat) emits 5,300 kg CO2eq, consumes 274 m3 of water, and requires 159,000 MJeq during its manufacture. Future work will incorporate the results from this study into the LCA model used to estimate the life cycle impacts of the entire 100 MWnet power tower CSP plant.

Heath, G.; Burkhardt, J.; Turchi, C.

2012-10-01T23:59:59.000Z

374

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CP&L-2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is

375

Analysis of the LaSalle Unit 2 nuclear power plant: Risk Methods Integration and Evaluation Program (RMIEP). Volume 8, Seismic analysis  

SciTech Connect

This report describes the methodology used and the results obtained from the application of a simplified seismic risk methodology to the LaSalle County Nuclear Generating Station Unit 2. This study is part of the Level I analysis being performed by the Risk Methods Integration and Evaluation Program (RMIEP). Using the RMIEP developed event and fault trees, the analysis resulted in a seismically induced core damage frequency point estimate of 6.OE-7/yr. This result, combined with the component importance analysis, indicated that system failures were dominated by random events. The dominant components included diesel generator failures (failure to swing, failure to start, failure to run after started), and condensate storage tank.

Wells, J.E.; Lappa, D.A.; Bernreuter, D.L.; Chen, J.C.; Chuang, T.Y. [Lawrence Livermore National Lab., CA (United States); Johnson, J.J.; Campbell, R.D.; Hashimoto, P.S.; Maslenikov, O.R.; Tiong, L.W.; Ravindra, M.K.; Kincaid, R.H. [EQE, International, Irvine, CA (United States); Sues, R.H.; Putcha, C.S. [NTS Engineering, Long Beach, CA (United States)

1993-11-01T23:59:59.000Z

376

Illinois Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois nuclear power plants, summer capacity and net generation, 2010" Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Braidwood Generation Station Unit 1, Unit 2","2,330","19,200",20.0,"Exelon Nuclear" "Byron Generating Station Unit 1, Unit 2","2,300","19,856",20.6,"Exelon Nuclear" "Clinton Power Station Unit 1","1,065","8,612",9.0,"Exelon Nuclear" "Dresden Generating Station Unit 2, Unit 3","1,734","14,593",15.2,"Exelon Nuclear" "LaSalle Generating Station

377

AFBC-HAGT, an efficient small scale power plant  

DOE Green Energy (OSTI)

A team comprised of the Energy and Environmental Research Corporation (EER), the Will-Burt Company, and the Ohio Agricultural Research and Development Center (OARDC) designed installed and tested a pilot scale atmospheric fluidized (bubbling) bed combustion (AFBC) system to heat hot water. Following testing, a commercial prototype unit was installed at Cedar Lane Farms (CLF), near Wooster, Ohio. The unit was started up in January, 1995, and is currently in operation. It provides hot water for greenhouse heating, requiring about two hours per day of operator attention. The development was funded by the Ohio Coal Development Office, the U.S. Department of Energy, and the team members. Based on the success of the prototype operation a commercial size unit was recently designed for hot water heating use. This small scale AFBC system can be designed not only to produce hot water or steam but also to efficiently generate electricity (60 kWe to 3.5 MWe size range). Most small scale fluidized bed systems use in-bed heat transfer tubes to generate saturated steam which can then be superheated and fed to a steam turbine for electrical power generation. This AFBC has no internal heat transfer surfaces. It can be combined with an air heater that is integrated with a recuperated Hot Air Gas Turbine (HAGT), to yield a more efficient power plant than that possible with small steam plants of comparable size that have optimal gross efficiencies of about 12% (29,060 Btu/kWhr). Depending on ambient air temperature, this AFBC-HAGT power cycle can reach efficiencies of 28% without auxiliary diesel fuel oil firing. The system is ideally suited for rural communities that are not tied into an electric power grid. It is low tech, easy to operate, provides approximately double the efficiency of small steam cycle power plants, and can be used in areas where water is scarce. When firing local coal and/or bio-mass it can be very cost effective compared to diesel power generation.

Ashworth, R.A. [Energy and Environmental Research Corp., Orrville, OH (United States); Webner, R.L. [Will-Burt Company, Orrville, OH (United States); Keener, H.M. [Ohio State Univ., Wooster, OH (United States). Ohio Agricultural Research and Development Center

1997-12-31T23:59:59.000Z

378

Multisystem Data Integration in Fossil Power Plants  

Science Conference Proceedings (OSTI)

A modern power plant has numerous measurements, control signals, and other data that are used for process control, state indication, plant information, and equipment health monitoring. Much of these data are available in the control system and its associated process historian, but other data can reside in auxiliary systems, such as programmable logic controllers, unconnected (local) instruments, and computerized systems used for combustion monitoring, advanced process control, emissions control, ...

2013-11-27T23:59:59.000Z

379

Revised FINAL–REPORT NO. 2: INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, NEWPORT, MICHIGAN (DOCKET NO. 50 16; RFTA 10-004) 2018-SR-02-1  

Science Conference Proceedings (OSTI)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

Erika Bailey

2011-10-27T23:59:59.000Z

380

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

382

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

adjustments to these rates will become effective upon acceptance for filing by the Federal Energy Regulatory Commission (FERC) of Virginia Power's or CP&L's rate. Transmission:...

383

Investigation of the Potential for Biofuel Blends in Residual Oil-Fired Power Generation Units as an Emissions Reduction Strategy for New York State  

SciTech Connect

There is a significant amount of oil, about 12.6 million barrels per year, used for power generation in New York State. The majority of it is residual oil. The primary reason for using residual oil probably is economic, as these fuels are cheaper than distillates. However, the stack emissions from the use of such fuels, especially in densely populated urban areas, can be a cause for concern. The emissions of concern include sulfur and nitrogen oxides and particulates, particularly PM 2.5. Blending with distillate (ASTM No.2) fuels may not reduce some or all of these emissions. Hence, a case can be made for blending with biofuels, such as biodiesel, as they tend to have very little fuel bound sulfur and nitrogen and have been shown in prior work at Brookhaven National Laboratory (BNL) to reduce NOx emissions as well in small boilers. Some of the research carried out at CANMET in Canada has shown potential reductions in PM with blending of biodiesel in distillate oil. There is also the benefit obtaining from the renewable nature of biofuels in reducing the net carbon dioxide emitted thus contributing to the reduction of green house gases that would otherwise be emitted to the atmosphere. The present project was conceived to examine the potential for such benefits of blending biofuels with residual oil. A collaboration was developed with personnel at the New York City Poletti Power Plant of the New York Power Authority. Their interest arose from an 800 MW power plant that was using residual oil and which was mandated to be shut down in 2010 because of environmental concerns. A blend of 20% biodiesel in residual oil had also been tested for a short period of about two days in that boiler a couple of years back. In this project, emission measurements including particulate measurements of PM2.5 were made in the commercial boiler test facility at BNL described below. Baseline tests were done using biodiesel as the blending biofuel. Biodiesel is currently and probably in the foreseeable future more expensive than residual fuel. So, another task was to explore potential alternative biofuels that might confer emission benefits similar to those of biodiesel, while being potentially significantly cheaper. Of course, for power plant use, availability in the required quantities is also a significant criterion. A subsidiary study to determine the effect of the temperature of the filter used to collect and measure the PM 2.5 emissions was conducted. This was done for reasons of accuracy in a residential boiler using distillate fuel blends. The present report details the results obtained in these tests with the baseline ASTM No. 6 fuel and blends of biodiesel with it as well as the results of the filter temperature study. The search for the alternative 'cheaper' biofuel identified a potential candidate, but difficulties encountered with the equipment during the testing prevented testing of the alternative biofuel.

Krishna, C.R.; McDonald, R.

2009-05-01T23:59:59.000Z

384

Investigation of the Potential for Biofuel Blends in Residual Oil-Fired Power Generation Units as an Emissions Reduction Strategy for New York State  

SciTech Connect

There is a significant amount of oil, about 12.6 million barrels per year, used for power generation in New York State. The majority of it is residual oil. The primary reason for using residual oil probably is economic, as these fuels are cheaper than distillates. However, the stack emissions from the use of such fuels, especially in densely populated urban areas, can be a cause for concern. The emissions of concern include sulfur and nitrogen oxides and particulates, particularly PM 2.5. Blending with distillate (ASTM No.2) fuels may not reduce some or all of these emissions. Hence, a case can be made for blending with biofuels, such as biodiesel, as they tend to have very little fuel bound sulfur and nitrogen and have been shown in prior work at Brookhaven National Laboratory (BNL) to reduce NOx emissions as well in small boilers. Some of the research carried out at CANMET in Canada has shown potential reductions in PM with blending of biodiesel in distillate oil. There is also the benefit obtaining from the renewable nature of biofuels in reducing the net carbon dioxide emitted thus contributing to the reduction of green house gases that would otherwise be emitted to the atmosphere. The present project was conceived to examine the potential for such benefits of blending biofuels with residual oil. A collaboration was developed with personnel at the New York City Poletti Power Plant of the New York Power Authority. Their interest arose from an 800 MW power plant that was using residual oil and which was mandated to be shut down in 2010 because of environmental concerns. A blend of 20% biodiesel in residual oil had also been tested for a short period of about two days in that boiler a couple of years back. In this project, emission measurements including particulate measurements of PM2.5 were made in the commercial boiler test facility at BNL described below. Baseline tests were done using biodiesel as the blending biofuel. Biodiesel is currently and probably in the foreseeable future more expensive than residual fuel. So, another task was to explore potential alternative biofuels that might confer emission benefits similar to those of biodiesel, while being potentially significantly cheaper. Of course, for power plant use, availability in the required quantities is also a significant criterion. A subsidiary study to determine the effect of the temperature of the filter used to collect and measure the PM 2.5 emissions was conducted. This was done for reasons of accuracy in a residential boiler using distillate fuel blends. The present report details the results obtained in these tests with the baseline ASTM No. 6 fuel and blends of biodiesel with it as well as the results of the filter temperature study. The search for the alternative 'cheaper' biofuel identified a potential candidate, but difficulties encountered with the equipment during the testing prevented testing of the alternative biofuel.

Krishna, C.R.; McDonald, R.

2009-05-01T23:59:59.000Z

385

Auxiliary Ligand-Dependent Assembly of Several Ni/Ni-Cd Compounds with N2O2 Donor Tetradentate Symmetrical Schiff Base Ligand  

DOE Green Energy (OSTI)

Several low-dimensional Ni/Ni-Cd complexes containing N2O2 donor tetradentate symmetrical Schiff base ligand bis(acetylacetone)ethylene-diamine (sy-H2L2), namely, [Ni(sy-L2)]2?HLa?ClO4 (2), (HLa)2?(ClO4)?(NO3) (3), [Ni(sy-L2)X]2](4,4’-bipy) (where La = 5,7-dimethyl-3,6-dihydro-2H-1,4-diazepine, X = ClO4 (4), X=NO3 (5), [Ni(sy-L2)Cd(SCN)2]n (6) and [Ni(sy-L2)?Cd(N3)2]n (7) have been synthesized from [Ni(sy-L2)]2?H2O (1). Complex 2, is three component discrete assembly generated from (HLa)+ moiety bridged with [Ni(sy-L2)] unit and ClO4- anion. A solution containing complex 2 and Cd(NO3)2 results in a mixture of 1 and 3. Further re-crystallization of 1 and 3 with various auxiliary ligands, provides coordination complexes 4 – 7 stabilized by weak hydrogen bonds in which 6 and 7 represent the first 1D heteronuclear complexes based on symmetric acacen-base Schiff base ligand.

Ge, Ying Ying; Li, Guo-Bi; Fang, Hua-Cai; Zhan, Xu Lin; Gu, Zhi-Gang; Chen, Jin Hao; Sun, Feng; Cai, Yue-Peng; Thallapally, Praveen K.

2010-09-18T23:59:59.000Z

386

Evaluation of Flygt Propeller Xixers for Double Shell Tank (DST) High Level Waste Auxiliary Solids Mobilization  

Science Conference Proceedings (OSTI)

The River Protection Project (RPP) is planning to retrieve radioactive waste from the single-shell tanks (SST) and double-shell tanks (DST) underground at the Hanford Site. This waste will then be transferred to a waste treatment plant to be immobilized (vitrified) in a stable glass form. Over the years, the waste solids in many of the tanks have settled to form a layer of sludge at the bottom. The thickness of the sludge layer varies from tank to tank, from no sludge or a few inches of sludge to about 15 ft of sludge. The purpose of this technology and engineering case study is to evaluate the Flygt{trademark} submersible propeller mixer as a potential technology for auxiliary mobilization of DST HLW solids. Considering the usage and development to date by other sites in the development of this technology, this study also has the objective of expanding the knowledge base of the Flygt{trademark} mixer concept with the broader perspective of Hanford Site tank waste retrieval. More specifically, the objectives of this study delineated from the work plan are described.

PACQUET, E.A.

2000-07-20T23:59:59.000Z

387

Preliminary safety analysis report for the Auxiliary Hot Cell Facility, Sandia National Laboratories, Albuquerque, New Mexico  

Science Conference Proceedings (OSTI)

The Auxiliary Hot Cell Facility (AHCF) at Sandia National Laboratories, New Mexico (SNL/NM) will be a Hazard Category 3 nuclear facility used to characterize, treat, and repackage radioactive and mixed material and waste for reuse, recycling, or ultimate disposal. A significant upgrade to a previous facility, the Temporary Hot Cell, will be implemented to perform this mission. The following major features will be added: a permanent shield wall; eight floor silos; new roof portals in the hot-cell roof; an upgraded ventilation system; and upgraded hot-cell jib crane; and video cameras to record operations and facilitate remote-handled operations. No safety-class systems, structures, and components will be present in the AHCF. There will be five safety-significant SSCs: hot cell structure, permanent shield wall, shield plugs, ventilation system, and HEPA filters. The type and quantity of radionuclides that could be located in the AHCF are defined primarily by SNL/NM's legacy materials, which include radioactive, transuranic, and mixed waste. The risk to the public or the environment presented by the AHCF is minor due to the inventory limitations of the Hazard Category 3 classification. Potential doses at the exclusion boundary are well below the evaluation guidelines of 25 rem. Potential for worker exposure is limited by the passive design features incorporated in the AHCF and by SNL's radiation protection program. There is no potential for exposure of the public to chemical hazards above the Emergency Response Protection Guidelines Level 2.

OSCAR,DEBBY S.; WALKER,SHARON ANN; HUNTER,REGINA LEE; WALKER,CHERYL A.

1999-12-01T23:59:59.000Z

388

Response of the SPND measurement system to temperature during the Three Mile Island Unit 2 accident. [Self-Powered Neutron Detector  

SciTech Connect

The Self-Powered Neutron Detector (SPND) Measuring System is evaluated to determine its ability to indicate temperatures of the fuel rods in the TMI-2 reactor core during the accident. It is concluded for the following reasons that the SPND Measuring System did not provide fuel rod temperatures during the accident: the heat transfer characteristics vary over a range of five octaves; within the range of 1200 to 1800/sup 0/F, the SPND responds to temperature from convection radiation from the fuel rods and self-heating from the gamma flux; within the range of 1200 to 1800/sup 0/F, the signal cable introduces masking signals that are a function of gamma heating, integrated temperature over the cable, and core water level velocity; the data system's worst-case signal-to-noise ratio from aliasing is 0dB; and the recorder system's worst-case signal-to-noise ratio from aliasing is -24dB.

Wilde, N.; Morrison, J.L. Jr.

1981-12-01T23:59:59.000Z

389

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1  

SciTech Connect

During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1.

Whitehead, D.W. [ed.; Staple, B.D.; Daniel, S.L. [and others

1995-07-01T23:59:59.000Z

390

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B 1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability:

391

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISS-1-N MISS-1-N Availability: This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects.

392

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company. Nothing in this

393

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B 2-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government. The Government is responsible for arranging transmission with the Company and PJM.

394

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA-1-B VA-1-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule is applicable to customers receiving power from the Government on an arrangement where the Company schedules the power and provides the Customer a credit on their bill for Government power. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow

395

Wind Resource Mapping for United States Offshore Areas  

DOE Green Energy (OSTI)

A poster for the WindPower 2006 conference showing offshore resource mapping efforts in the United States.

Elliott, D.; Schwartz, M.

2006-06-01T23:59:59.000Z

396

Validation of the RVACS (Reactor Vessel Auxiliary Cooling System)/RACS (Reactor Air Cooling System) model in SASSYS-1  

SciTech Connect

The SASSYS-1 LMR systems analysis code contains a model for transient analysis of heat removal by a RVACS (Reactor Vessel Auxiliary Cooling System) or a RACS (Reactor Air Cooling System) in an LMR (Liquid Metal Reactor). This model has been validated by comparisons of model predictions with experimental data from a large scale RVACS/RACS simulation experiment performed at Argonne National Laboratory. 4 refs., 1 fig.

Dunn, F.E.

1987-01-01T23:59:59.000Z

397

Steam Turbine Generator Auxiliary System Maintenance Guide--Volume 7 (Generator Excitation System)  

Science Conference Proceedings (OSTI)

Excitation systems are a critical part of the power generation system. They must be capable of providing a reliable excitation current to the generator and respond to system fluctuations while maintaining consistent generator voltage and power factor. Most modern excitation systems use a static or rotating solid-state exciter and include the associated components required to provide regulation and control over voltage and reactive power flow and to enhance power system stability. The proper operation of ...

2011-12-23T23:59:59.000Z

398

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

399

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and

400

Productivity Improvement for Fossil Steam Power Plants, 2009  

Science Conference Proceedings (OSTI)

This report assembles case studies on productivity improvement taken from the webside of Productivity Improvement Expert Reviews (PIER) on subjects spanning the power plant from the boiler to the steam turbine, and including the plant auxiliaries and the environmental control equipment. These studies have been critically assessed by technical experts who have discussed the improvements with the power plant staff and judged their potential for future use in the fossil industry. This 2009 report also looks...

2010-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B 4-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Carolina Power & Light Company (hereinafter called the Company). The Customer has chosen to self-schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to

402

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

systems of the Customer. Points of Delivery The points of delivery will be the 161,000 volt bus of the Wolf Creek Power Plant and the 161,000 volt bus of the Laurel Project. Other...

403

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B 4-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). The Customer has chosen to self- schedule and does not receive Government power under an arrangement where the Company schedules the power and provides a credit on the Customer's bill for Government power. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule.

404

Air-breathing fuel cell stacks for portable power applications  

DOE Green Energy (OSTI)

Increasing attention is being directed towards polymer electrolyte fuel cells as battery replacements because of their potentially superior energy densities and the possibility of `mechanical` refueling. On the low end of the power requirement scale (ca. 10 W), fuel cells can compete with primary and secondary batteries only if the fuel cell systems are simple, inexpensive, and reliable. Considerations of cost and simplicity (and minimal parasitic power) discourage the use of conventional performance enhancing subsystems (e.g., humidification, cooling, or forced-reactant flow). We are developing a stack design that is inherently self-regulating to allow effective operation without the benefit of such auxiliary components. The air cathode does not use forced flow to replenish the depleted oxygen. Instead, the oxygen in the air must diffuse into the stack from the periphery of the unit cells. For this reason the stack is described as `air-breathing.` This configuration limits the ability of water to escape which prevents the polymer electrolyte membranes from drying out, even at relatively high continuous operation temperatures (+60 degrees C). This results in stacks with reliable and stable performance. This air-breathing configuration assumes a unique stack geometry that utilizes circular flow-field plates with an annular hydrogen feed manifold and the single tie-bolt extending up through the central axis of the stack. With this geometry, the hydrogen supply to the unit cells is radially outward, and the air supply is from the periphery inward. This configuration has several advantages. The entire periphery is free to air access and allows greater heat conduction to enhance cooling. Furthermore, all of the components in the stack (e.g., the flow-fields, seals and membrane/electrode assemblies), are radially symmetrical, so part fabrication is simple and the entire system is potentially low-cost. Lastly, this configuration is compact and lightweight.

Wilson, M.S.; DeCaro, D.; Neutzler, J.K.; Zawodzinski, C.; Gottesfeld, S.

1996-10-01T23:59:59.000Z

405

Health hazard evaluation report No. HHE-80-233-793, Davis Bessie Nuclear Power Station, Toledo Edison Company, United Engineers and Contractors Company (UE and C), Oak Harbor, Ohio  

Science Conference Proceedings (OSTI)

Personal air samples were analyzed and employees were given medical evaluations at Davis Bessie Nuclear Power Station (SIC-4911) in Oak Harbor, Ohio. Requests for evaluation were made by a union representative of the United Engineers and Contractors and a union representative of employees of Toledo Edison Company, working on site at the power station, to evaluate employee skin and scalp problems due to exposure to ceramic wood fibers. Preliminary surveys were conducted on September 24 and 25, 1980 and a follow-up survey was performed on October 16, 1980. Environmental evaluation consisted of gravimetric analyses of personal air samples for airborne ceramic wool fibers. A total of 400 production and maintenance workers and varying numbers of construction workers were exposed to the fibers during installation of insulation which was completed at the time of the survey. The three personal air samples showed no accumulation of particulates and fibers detected were nonrespirable. Medical evaluations were conducted in 52 workers and scalp scrapings were obtained from 43 workers. Thirty seven workers had histories suggestive of irritant dermatitis of the scalp; 24 workers had physical findings consistent with the diagnosis. Of the 43 scalp samples, 18 were contaminated with organisms of the gut, perineum, skin or respiratory tract. Dermatitis was directly related to the history of dust exposure. The authors conclude that a potential health hazard exists for employees from exposure to ceramic wool fiber. Recommendations include provision of handwashing facilities and protective clothing for employees, and installation of an impermeable covering for the ceramic wool fiber.

Cone, J.; Hartle, R.

1981-01-01T23:59:59.000Z

406

Performance Evaluation of a 4.5 kW (1.3 Refrigeration Tons) Air-Cooled Lithium Bromide/Water Solar Powered (Hot-Water-Fired) Absorption Unit  

Science Conference Proceedings (OSTI)

During the summer months, air-conditioning (cooling) is the single largest use of electricity in both residential and commercial buildings with the major impact on peak electric demand. Improved air-conditioning technology has by far the greatest potential impact on the electric industry compared to any other technology that uses electricity. Thermally activated absorption air-conditioning (absorption chillers) can provide overall peak load reduction and electric grid relief for summer peak demand. This innovative absorption technology is based on integrated rotating heat exchangers to enhance heat and mass transfer resulting in a potential reduction of size, cost, and weight of the "next generation" absorption units. Rotartica Absorption Chiller (RAC) is a 4.5 kW (1.3 refrigeration tons or RT) air-cooled lithium bromide (LiBr)/water unit powered by hot water generated using the solar energy and/or waste heat. Typically LiBr/water absorption chillers are water-cooled units which use a cooling tower to reject heat. Cooling towers require a large amount of space, increase start-up and maintenance costs. However, RAC is an air-cooled absorption chiller (no cooling tower). The purpose of this evaluation is to verify RAC performance by comparing the Coefficient of Performance (COP or ratio of cooling capacity to energy input) and the cooling capacity results with those of the manufacturer. The performance of the RAC was tested at Oak Ridge National Laboratory (ORNL) in a controlled environment at various hot and chilled water flow rates, air handler flow rates, and ambient temperatures. Temperature probes, mass flow meters, rotational speed measuring device, pressure transducers, and a web camera mounted inside the unit were used to monitor the RAC via a web control-based data acquisition system using Automated Logic Controller (ALC). Results showed a COP and cooling capacity of approximately 0.58 and 3.7 kW respectively at 35 C (95 F) design condition for ambient temperature with 40 C (104 F) cooling water temperature. This is in close agreement with the manufacturer data of 0.60 for COP and 3.9 kW for cooling capacity. This study resulted in a complete performance map of RAC which will be used to evaluate the potential benefits of rotating heat exchangers in making the "next-generation" absorption chillers more compact and cost effective without any significant degradation in the performance. In addition, the feasibility of using rotating heat exchangers in other applications will be evaluated.

Zaltash, Abdolreza [ORNL; Petrov, Andrei Y [ORNL; Linkous, Randall Lee [ORNL; Vineyard, Edward Allan [ORNL

2007-01-01T23:59:59.000Z

407

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Carolina Power & Light Company (hereinafter called the Company) and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter

408

Single-bridge unit-connected HVDC generation with increased pulse number  

Science Conference Proceedings (OSTI)

A true unit-connected generator-HVdc convertor scheme is proposed which removes the need to use two bridges in series to achieve twelve-pulse operation. Moreover, the combination of a single main bridge and an auxiliary feedback dc ripple reinjection bridge is shown to increase the pulse number from 6 to 18. This is achieved purely by natural commutation and is equally valid for rectification and inversion. The theoretical waveforms are validated by extensive experimental verification.

Villablanca, M.; Arrillaga, J. (Univ. of Canterbury, Christchurch (New Zealand))

1993-04-01T23:59:59.000Z

409

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

410

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

411

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B 3-B Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be scheduled pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. The Government is responsible for providing the scheduling. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability:

412

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wholesale Power Rate Schedule CBR-1-H Availability: This rate schedule shall be available to Big Rivers Electric Corporation and includes the City of Henderson, Kentucky (hereinafter called the Customer). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 hertz. The power shall be delivered at nominal voltages

413

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

May 25, 2007 ... The United States Nuclear Power Industry is “reawakening”. ... for a New Generation of Power Plants", Materials Technology@TMS, May 2007.

414

Tilbury Green Power | Open Energy Information  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Tilbury Green Power Jump to: navigation, search Name Tilbury Green Power Place United Kingdom Sector...

415

Wind Power Ltd | Open Energy Information  

Open Energy Info (EERE)

Power Ltd Place Wickam Market, United Kingdom Sector Wind energy Product Conducting research into alternative, large scale wind turbine design. References Wind Power Ltd1...

416

Advanced Energy-Efficient Filtration: Fan Filter Unit  

E-Print Network (OSTI)

8 5.3.1 FFU Electric Power and Airflowacross the unit. Total electric power demand. 5.2.1 Test5.3 Results 5.3.1 FFU Electric Power and Airflow Speed

Xu, Tengfang

2005-01-01T23:59:59.000Z

417

Michigan Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2mi Donald C Cook Unit 1, Unit 2 2,069 15,646 52.8 Indiana Michigan Power Co Fermi Unit 2 1,085 7,738 26.1 Detroit Edison Co Palisades Unit 1 793 ...

418

Definition: British thermal unit | Open Energy Information  

Open Energy Info (EERE)

thermal unit thermal unit Jump to: navigation, search Dictionary.png British thermal unit The amount of heat required to raise the temperature of one pound of water one degree Fahrenheit; often used as a unit of measure for the energy content of fuels.[1][2] View on Wikipedia Wikipedia Definition The British thermal unit (BTU or Btu) is a traditional unit of energy equal to about 1055 joules. It is the amount of energy needed to cool or heat one pound of water by one degree Fahrenheit. In scientific contexts the BTU has largely been replaced by the SI unit of energy, the joule. The unit is most often used as a measure of power (as BTU/h) in the power, steam generation, heating, and air conditioning industries, and also as a measure of agricultural energy production (BTU/kg). It is still used

419

Maryland Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

of State nuclear net generation (percent)","Owner" "Calvert Cliffs Nuclear Power Plant Unit 1, Unit 2","1,705","13,994",100.0,"Calvert Cliffs Nuclear PP Inc" "1 Plant 2...

420

Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations  

SciTech Connect

In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10{sup {minus}6}/year.

Budnitz, R.J. [Future Resources Associates, Inc., Berkeley, CA (United States); Davis, P.R. [PRD Consulting (United States); Ravindra, M.K.; Tong, W.H. [EQE International, Inc., Irvine, CA (United States)

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

PRESENTATONS: Reawakening of United States Nuclear Energy: Materials Challenges for a New Generation of Power Plants Presentations by Harold ...

422

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)  

SciTech Connect

This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf.

Whitehead, D. [Sandia National Labs., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States)] [and others

1994-06-01T23:59:59.000Z

423

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E 2-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter

424

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E 1-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

425

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E 2-E Availability: This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). The customer is responsible for providing a scheduling arrangement with the Government. Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

426

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E 3-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

427

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E 2-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter

428

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E 3-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. The Customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter

429

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wholesale Power Rate Schedule JW-1-J Availability: This rate schedule shall be available to public bodies and cooperatives served by the Progress Energy Florida and having points of delivery within 150 miles of the Jim Woodruff Project (hereinafter called the Project). Applicability: This rate schedule shall be applicable to firm power and accompanying energy made available by the Government from the Project and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 cycles per second delivered at the delivery points of the customer. Monthly Rate: The monthly rate for capacity and energy made available or delivered under this

430

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALA-1-N ALA-1-N Availability: This rate schedule shall be available to the PowerSouth Energy Cooperative (hereinafter called the Cooperative). Applicability: This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a nominal frequency of 60 Hertz and shall be delivered at the

431

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duke-1-E Duke-1-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

432

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E 3-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). The customer is responsible for providing a transmission arrangement. Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

433

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOCO-1-E SOCO-1-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

434

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCE&G-1-E SCE&G-1-E Availability: This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

435

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

436

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

437

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

438

Superconducting Power Cables  

Science Conference Proceedings (OSTI)

Power cables constructed from superconducting materials are being realized in utility demonstrations within the United States. Cooled by liquid nitrogen, high temperature superconducting power cables can transfer large amounts of power through relatively small cross sections. The key to their high power capacity is the high current density inherent with superconductors; a superconducting wire can conduct several times as much current as copper or aluminum conductors of the same cross section. For the pas...

2006-11-30T23:59:59.000Z

439

PRELIMINARY SAFEGUARDS REPORT BASED ON URANIUM-MOLYBDENUM FUEL FOR THE HALLAM NUCLEAR POWER FACILITY  

SciTech Connect

The Hallam Power Reactor is described relative to site, buildings, reactor and associated heat-transfer system, instrumentation and control, auxiliary systems, and fuel and component handling facilities. The potential hazards of radioactivity and safeguards for confinement are discussed. Radiation levels and accidental effluent release are considered. Transients with and without protective system action are discussed. (B.O.G.)

Gershun, T.L. ed.

1961-10-31T23:59:59.000Z

440

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nUnited States Government Department of Energy Bonneville Power Administration memorandum REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO: Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Access road improvement and bridge replacement for the Raver-Paul No. transmission line structure 18/1. Budget Information: Work Order # 00220048 PP&A Project No.: 954 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ....are required to

Note: This page contains sample records for the topic "auxiliary power units" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Fuel Cell Technologies Program Multi-Year Research, Development...  

NLE Websites -- All DOE Office Websites (Extended Search)

petroleum gas (LPG, consisting predominantly of propane) or renewable fuels such as biogas from wastewater treatments plants. Fuel cells for auxiliary power units in trucks will...

442

Energy Basics: Wind Power Animation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EERE: Energy Basics Wind Power Animation This animation discusses the advantages of wind power, the workings of a wind turbine, and wind resources in the United States. It also...

443

Gaia Power | Open Energy Information  

Open Energy Info (EERE)

Page Edit with form History Facebook icon Twitter icon Gaia Power Jump to: navigation, search Name Gaia Power Place Yarm, United Kingdom Zip TS15 9BG Sector Biomass Product...

444

The power tool  

Science Conference Proceedings (OSTI)

POWER Tool--Planning, Optimization, Waste Estimating and Resourcing tool, a hand-held field estimating unit and relational database software tool for optimizing disassembly and final waste form of contaminated systems and equipment.

HAYFIELD, J.P.

1999-02-01T23:59:59.000Z

445

The future of nuclear power  

SciTech Connect

Present conditions and future prospects for the nuclear power industry in the United States are discussed. The presentation includes a review of trends in electrical production, the safety of coal as compared to nuclear generating plants, the dangers of radiation, the economics of nuclear power, the high cost of nuclear power in the United States, and the public fear of nuclear power. 20 refs. (DWL)

Zeile, H.J.

1987-01-01T23:59:59.000Z

446

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pump-2 Pump-2 Availability: This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. Applicability: This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This energy will be segregated from energy from other pumping operations.

447

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E 4-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). The customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

448

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duke-4-E Duke-4-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement with the Company. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter

449

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Replacement-1 Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. Applicability: This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Character of Service: The energy supplied hereunder will be delivered at the delivery points provided for under appropriate contracts between the Government and the Customer. Monthly Rate: The rate for energy sold under this rate schedule for the months specified shall

450

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E 4-E Availability: This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina served through the transmission facilities of South Carolina Electric & Gas Company (hereinafter called the Company). The customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude an eligible customer from electing service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B.

451

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-A 1-A Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. Applicability: This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. The energy will be segregated from energy from other pumping operations. Character of Service: The energy supplied hereunder will be delivered at the delivery points provided for under appropriate contracts between the Government and the Customer.

452

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOCO-4-E SOCO-4-E Availability: This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. The Customer is responsible for providing a scheduling arrangement with the Government and for providing a transmission arrangement. Nothing in this rate schedule shall preclude modifications to the aforementioned contracts to allow an eligible customer to elect service under another rate schedule. Applicability: This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter

453

Implementation and Evaluation of an Ultracapacitor-Based Auxiliary Energy System for Electric Vehicles  

E-Print Network (OSTI)

in which the lead-acid batteries are replaced by a fuel cell. In this case, costs of different power-acid battery pack and a 54 kW brushless DC motor. Two control strategies where developed: one based. The results were incorporated to an economic evaluation of the system, showing that the reduction in costs

Rudnick, Hugh

454

Ocean thermal energy conversion (OTEC) power system development. Conceptual design  

DOE Green Energy (OSTI)

The conceptual design of a power system for application to the OTEC 100-MWe Demonstration Plant is presented. System modeling, design, and performance are described in detail. Materials considerations, module assembly, and cost considerations are discussed. Appendices include: A) systems analysis, B) general arrangements, C) system equipment, D) ammonia system material considerations; E) ammonia cycle, F) auxiliary subsystems, G) DACS availability analysis, H) heat exchanger supporting data, I) rotating machinery, and J) platform influences. (WHK)

Not Available

1978-01-30T23:59:59.000Z

455

Productivity Improvement for Fossil Steam Power Plants: Industry Case Studies  

Science Conference Proceedings (OSTI)

The "Productivity Improvement Handbook for Fossil Steam Plants," now in its third edition, has included many descriptions of successfully applied advanced techniques and products. In the last few years, an increasingly diverse set of plant case studies have been described in some detail on the website of the Productivity Improvement User Group. This report assembles more than sixty of these case studies on subjects spanning the power plant from the boiler and the steam turbine, through plant auxiliaries ...

2003-11-17T23:59:59.000Z

456

Phasor Measurement Unit (PMU) Implementation and Applications  

Science Conference Proceedings (OSTI)

The effective operation of power systems in the present and the future depends to a large extent on how well the emerging challenges are met today. Power systems continue to be stressed as they are operated in many instances at or near their full capacities. In order to keep power systems operating securely and economically, it is necessary to further improve power and control system protection. Synchronized phasor measurements8212also known as phasor measurement units (PMUs)8212are ideal for monitoring ...

2007-10-31T23:59:59.000Z

457

Economical operation of thermal generating units integrated with smart houses  

Science Conference Proceedings (OSTI)

This paper presents an economic optimal operation strategy for thermal power generation units integrated with smart houses. With the increased competition in retail and power sector reasoned by the deregulation and liberalization of power market make ... Keywords: particle swarm optimization, renewable energy sources, smart grid, smart house, thermal unit commitment

Shantanu Chakraborty; Takayuki Ito; Tomonobu Senjyu

2012-09-01T23:59:59.000Z

458

Index Terms --Smart grid; power engineering education; power engineering curriculum; power engineering re-  

E-Print Network (OSTI)

1 Index Terms -- Smart grid; power engineering education; power engineering curriculum; power the United States power system has led to an engineering initiative va- riously known as `smart grid the smart grid will be educated, how they should be trained, and to what levels of comprehension

459

Reliability Estimates for Power Supplies  

Science Conference Proceedings (OSTI)

Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

Lee C. Cadwallader; Peter I. Petersen

2005-09-01T23:59:59.000Z

460

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage  

SciTech Connect

In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refue