  1. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  2. Federal Authorities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Authorities Federal Authorities DOE is the Sector Specific Agency (SSA) for Energy and within the Department ISER oversees all activities associated with the National Infrastructure Protection Plan (NIPP) and the Energy Sector Specific Plan (SSP). In doing so, ISER maintains a close partnership with the two Energy Sector Coordinating Councils (SCCs), the Electricity SCC and the Oil and Natural Gas SCC, and governmental partners through the Critical Infrastructure Protection Advisory

  3. Limitations on the Delegation of Authority by Federal Agencies to Initiate Tribal Consultation under Section 106 of National Historic Preservation Act (ACHP, 2011)

    Broader source: Energy.gov [DOE]

    The Advisory Council on Historic Preservation explains in this memo why federal agencies cannot delegate to applicants the responsibility for consultation with Indian tribes under Section 106 of the National Historic Preservation Act, unless expressly authorized by the Indian tribe to do so.

  4. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

  5. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  6. Federal Energy Management: Helping Agencies Achieve Savings

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program guides and advises agencies on how to use funding more effectively in meeting federal and agency-specific energy goals.

  7. Energy Management Mandates by Federal Legal Authority | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Laws & Requirements » Energy Management Mandates by Federal Legal Authority Energy Management Mandates by Federal Legal Authority Federal agencies are required to meet energy management mandates outlined by the following federal legal authorities. Click on a title to read the full text of each legal authority. Executive Order 13693: Planning for Federal Sustainability in the Next Decade Energy Independence and Security Act of 2007 Energy Policy Act of 2005 Executive Order 13221:

  8. Federal Emergency Management Agency | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Federal Emergency Management Agency Third interagency WINGS exercise The third Interagency Aerial Response WINGS exercise, sponsored by the Federal Emergency Management Agency (FEMA), and hosted by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), will be held June 20 - 24, 2016 in Ocean County, New Jersey. On June 21, 2016 through

  9. Identifying Renewable Energy Projects for Federal Agencies |...

    Broader source: Energy.gov (indexed) [DOE]

    projects that can help federal agencies meet their 30% renewable electricity by 2025 target. This research is summarized on this page. Renewable Energy Markets The size of the...

  10. Utility Energy Service Contracts for Federal Agencies

    Broader source: Energy.gov [DOE]

    Utility Energy Service Contracts (UESCs) allow federal agencies to take advantage of energy management services offered by their serving utilities including energy- and water-efficiency improvements, renewable energy, and demand-reduction.

  11. Renewable Energy Procurement for Federal Agencies

    Broader source: Energy.gov [DOE]

    FEMP’s Renewable Energy Procurement (REP) Program helps federal agencies reduce utility expenses, improve the energy security and resiliency of mission-critical facilities, and reduce environmental impacts. The REP Program bridges information gaps to help agencies meet their renewable energy goals and requirements.

  12. Best Practices and Lessons Learned for Federal Agency ESPC Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lessons Learned for Federal Agency ESPC Projects Best Practices and Lessons Learned for Federal Agency ESPC Projects Document highlights best practices and lessons learned for ...

  13. UESC Energy Solutions for Federal Agencies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Solutions for Federal Agencies UESC Energy Solutions for Federal Agencies This presentation includes an overview of UESC strategies and services by Pepco Energy Services....

  14. Federal Government Awards Multi-Agency Solar Power Purchase in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, ...

  15. Federal Agency Energy Coordinators for Award Nominations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Awards » Federal Agency Energy Coordinators for Award Nominations Federal Agency Energy Coordinators for Award Nominations Contact your agency coordinator in advance to discuss your Federal Energy and Water Management Award nomination. Agency coordinators are responsible for vetting nomination information and submitting approved nominations to the Federal Energy Management Program on behalf of the agencies. Each agency listed below is limited to 15 Federal Energy and Water Management

  16. Energy Savings Performance Contracts for Federal Agencies | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Contracts for Federal Agencies Energy Savings Performance Contracts for Federal Agencies Energy Savings Performance Contracts for Federal Agencies Energy savings performance contracts (ESPCs) allow federal agencies to procure energy savings and facility improvements with no up-front capital costs or special appropriations from Congress. An ESPC is a partnership between an agency and an energy service company (ESCO). Agencies have used the ESPC contracting vehicle since 1998 to

  17. Guidance for Federal Agencies on E.O. 13514 Section 12, Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management Document provides guidance on ...

  18. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reporting & Data » Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress

  19. Memorandum of Understanding Regarding Coordination in Federal Agency Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Electric Transmission Facilities on Federal Land, October 23, 2009 | Department of Energy Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve

  20. Best Practices and Lessons Learned for Federal Agency ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Best Practices and Lessons Learned for Federal Agency ESPC Projects Best Practices and Lessons Learned for Federal Agency ESPC Projects Document highlights best practices and lessons learned for agencies to consider during the energy savings performance contract (ESPC) process. Agencies can use this document to help them award high-quality, high-value ESPC task orders. Read the Best Practices and Lessons Learned for Federal Agency ESPC Projects. See individual sections:

  1. Best Practices and Lessons Learned for Federal Agency ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy and Lessons Learned for Federal Agency ESPC Projects Best Practices and Lessons Learned for Federal Agency ESPC Projects Document highlights best practices and lessons learned for agencies to consider during the energy savings performance contract (ESPC) process. Agencies can use this document to help them award high-quality, high-value ESPC task orders. Read the Best Practices and Lessons Learned for Federal Agency ESPC Projects. See individual sections: Section 1:

  2. Designation of Non-Federal Agencies as Cooperating Agencies ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    that are relevant in determining appropriate cooperating agencies, and encourages agencies to document their expectations, roles, and responsibilities (including funding). ...

  3. Solar Photovoltaic Financing: Deployment by Federal Government Agencies

    SciTech Connect (OSTI)

    Cory, K.; Coggeshall, C.; Coughlin, J.; Kreycik, C.

    2009-07-01

    The goal of this report is to examine how federal agencies can finance on-site PV projects. It explains state-level cash incentives available, the importance of solar renewable energy certificate revenues (in certain markets), existing financing structures, as well as innovative financing structures being used by federal agencies to deploy on-site PV. Specific examples from the DOD, DOE, and other federal agencies are highlighted to explain federal project financing in detail.

  4. Acquisition Guide for Federal Agencies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Federal Agencies Acquisition Guide for Federal Agencies A PROCEDURAL GUIDE FOR THE ACQUISITION OF REAL PROPERTY BY GOVERNMENTAL AGENCIES ACQGUIDEFED1972-OPAM (14.33 MB) More Documents & Publications EIS-0099: Final Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement EIS-0064: Final Environmental Impact Statement

  5. Designation of Non-Federal Agencies as Cooperating Agencies

    Broader source: Energy.gov [DOE]

    This Council on Environmental Quality Memorandum (CEQ) urges agencies to more actively solicit the participation of state, tribal and local governments as cooperating agencies in implementing the environmental impact statement process. The Memorandum refers agencies to existing CEQ guidance on the types of actions and expertise that are relevant in determining appropriate cooperating agencies, and encourages agencies to document their expectations, roles, and responsibilities (including funding).

  6. Identifying Renewable Energy Projects for Federal Agencies |...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. Department of Energy's Federal Energy Management Program (FEMP) is researching ... As an example, FEMP created a series of maps and graphs that illustrate federal facility ...

  7. Evidence-Based Background Material Underlying Guidance for Federal Agencies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Implementing Strategic Sustainability Performance Plans | Department of Energy Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Report is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and

  8. SUSTAINABILITY NEWS DOE and Other Federal Agencies Release 2015 SSPPs

    Energy Savers [EERE]

    and Other Federal Agencies Release 2015 SSPPs Last month, federal agencies released their 2015 Strategic Sustainability Performance Plans (SSPP), highlighting progress to date as well as future plans for meeting federal sustainability requirements. The SSPP provides agencies with a unified framework for citing progress to allow for a consistent approach across the government encouraging the communication of best practices and lessons learned. DOE's sixth SSPP outlines the Department's

  9. Executive Order 13186: Responsibilities of Federal Agencies To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order 13186: Responsibilities of Federal Agencies To Protect Migratory Birds Migratory bird conventions impose substantive obligations on the United States for the conservation of...

  10. Memorandum of Understanding Among Various Federal Agencies Regarding...

    Open Energy Info (EERE)

    of Agriculture, Department of Commerce, Department of Defense, Department of Energy, Environmental Protection Agency, The Council on Environmental Quality, the Federal Energy...

  11. FEMP Best Practices and Lessons Learned for Federal Agency ESPC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects Contents 1. ... Use FEMP Price Benchmarking data and consult FEMP's guidance on determining price ...

  12. Federal Agencies Collaborate to Expedite Construction of Alaska...

    Office of Environmental Management (EM)

    Collaborate to Expedite Construction of Alaska Natural Gas Pipeline Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas Pipeline June 29, 2006 - 2:44pm ...

  13. Energy Savings Performance Contracts for Federal Agencies | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy savings performance contracts (ESPCs) allow federal agencies to procure energy savings and facility improvements with no up-front capital costs or special appropriations ...

  14. Federal, State, Local Agencies Conclude Radiological Emergency...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    An interagency organization, the FRMAC involves the Department of Defense, the Environmental Protection Agency (EPA), the Department of Health and Human Services and the FBI in ...

  15. Title 10 CFR 900 Coordination of Federal Authorizations for Electric...

    Open Energy Info (EERE)

    900 Coordination of Federal Authorizations for Electric Transmission Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  16. Proposed Agency Information Collection: Federal Register Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and ...

  17. NREL: Technology Deployment - Other Federal Agency Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... annual electricity generation of 67.8 Terawatt hours. Printable Version Technology Deployment Home Project Development Project Technical Assistance Disaster Resilience Federal ...

  18. Federal Agencies Outline Bioeconomy Vision and Current Activities |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Agencies Outline Bioeconomy Vision and Current Activities Federal Agencies Outline Bioeconomy Vision and Current Activities February 22, 2016 - 12:30pm Addthis Federal Agencies Outline Bioeconomy Vision and Current Activities Harry Baumes Harry Baumes Senior Executive Advisor to the Bioenergy Technologies Office and Director, Office of Energy Policy and New Uses, U.S. Department of Agriculture This week at the Advanced Bioeconomy Leadership Conference, the U.S.

  19. Environmental enforcement of federal agencies: A struggle for power under the New Federalism. Master's thesis

    SciTech Connect (OSTI)

    Surver, R.E.

    1990-01-01

    The challenge to Federalism presented by the new wave of environmental statutes is, while not unique in our history, a significant strain on state and federal relations. Behind this tension is the question of who should enforce these laws, especially when the violator is a Federal agency. Traditionally Federal agencies have been free to perform their diverse missions without restraint either from other Federal agencies or the states. This freedom has led to abuse in the arena of environmental compliance. Recent congressional hearings concerning amendments to the Resource Conservation and Recovery Act saw a congressional feeding frenzy over what was termed the abominable mess of federal facility environmental compliance. The obvious anger and frustration directed toward federal agencies, including the Environmental Protection Agency (EPA), by representatives of the states is a clear indicator of the extent of the problem and also a catalyst for an ill-conceived and dangerous legislative fix.

  20. Federal Utility Partnership Working Group Agency Participants...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service Forest Service U.S. Department of Commerce U.S. Department of Defense Defense Logistics Agency U.S. Air Force U.S. Army U.S. Army National Guard U.S. Navy U.S. Department...

  1. Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pipeline | Department of Energy Collaborate to Expedite Construction of Alaska Natural Gas Pipeline Federal Agencies Collaborate to Expedite Construction of Alaska Natural Gas Pipeline June 29, 2006 - 2:44pm Addthis Agreement Establishes Framework for Increasing Energy Security WASHINGTON, DC - The U.S. Department of Energy and 14 other federal departments and agencies have signed an agreement to expedite the permitting and construction of the Alaska Natural Gas Pipeline which, when

  2. NREL Helps Federal Agencies Reach New Efficiency Targets - News Feature |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Helps Federal Agencies Reach New Efficiency Targets August 19, 2015 Three people stand in front of solar panels on top of the NREL parking garage. NREL researchers, from left, Andy Walker, a principal engineer in the Integrated Applications Center's Engineering and Modeling Group; Kate Anderson, manager of the Engineering and Modeling Group; and Marguerite Kelly, manager of the Market Partnerships and Tools Group, are working to help federal agencies become more energy efficient as part

  3. Memorandum of Understanding, Responsibilities of Federal Agencies to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protect Migratory Birds | Department of Energy Memorandum of Understanding, Responsibilities of Federal Agencies to Protect Migratory Birds Memorandum of Understanding, Responsibilities of Federal Agencies to Protect Migratory Birds September 12, 2013 DOE and the Department of the Interior's Fish and Wildlife Service (FWS) have entered into a Memorandum of Understanding (MOU) pursuant to the Migratory Bird Treaty Act. In order to enhance collaboration in promoting the conservation of

  4. Federal Register Notice: Proposed Agency Information Collection

    Broader source: Energy.gov [DOE]

    Federal Register Notice on the DOE’s invitation for public comment on its request to the Office of Management and Budget (OMB) to extend for three years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910–5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before November 7, 2011.

  5. Federal Register Notice: Proposed Agency Information Collection

    Broader source: Energy.gov [DOE]

    Federal Register Notice on the DOE’s invitation for public comment on its intent to request the Office of Management and Budget (OMB) to extend for four years the Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910–5149 that DOE is developing for submission to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before October 11, 2011.

  6. UNITED STATES OF AMERICA BEFORE THE FEDERAL LABOR RELATIONS AUTHORITY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "" SEP-20-2007 08:33 FLRR -SFRO P.01/01 " UNITED STATES OF AMERICA BEFORE THE FEDERAL LABOR RELATIONS AUTHORITY U,S:DEPARTMENf OF ENERGY RICHLAND OPERA nONS OFFICE RICHLAND) W ASHlNGTON -Activity CASE NO. SF-RP-90080 -and- ..NAllONAL FEDERATION OF FEDERAL EMPLOYEES, LOCAL 181 -Petitioner/Exclusive Represen~tive -and- AMERICAN FEDERATION OF GOVERNMENT EMPLOYEES, AFL.CIO -Labor Organization AMENDMENT OF CERTIFICATION Pursuant to Section 2422.1 ofllie Regulations of the Federal Labor

  7. Comments Received on the Coordination of Federal Authorizations for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the Integrated Interagency Pre-Application (IIP) Process | Department of Energy Received on the Coordination of Federal Authorizations for Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the Integrated Interagency Pre-Application (IIP) Process Comments Received on the Coordination of Federal Authorizations for Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the

  8. Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

  9. Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management

    Broader source: Energy.gov [DOE]

    Document provides guidance on planning—the first step in a recommended process for Federal agency fleet managers to select optimal petroleum reduction strategies as required under Executive Order (E.O.) 13514.

  10. Federal Agencies Combine Efforts to Protect Environment and Reduce Home

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Bills | Department of Energy Combine Efforts to Protect Environment and Reduce Home Energy Bills Federal Agencies Combine Efforts to Protect Environment and Reduce Home Energy Bills July 11, 2005 - 2:07pm Addthis Department of Housing and Urban Development; Department of Energy; Environmental Protection Agency WASHINGTON, DC- The Bush administration today announced a major new partnership aimed at reducing household energy costs by 10 percent over the next decade. The Partnership for

  11. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . INTRODUCTION Energy Savings Performance Contracts (ESPCs), first authorized by EPACT 1992 1 , have become an effective tool for financing energy projects in federally owned facilities. FEMP has been providing project and training to agencies going back to 1996. As agencies have implemented projects, their acquisition teams and FEMP have taken note of lessons learned and best practices, which over time have been incorporated into the DOE ESPCs, FEMP ESPC training, and FEMP project assistance.

  12. DOE Joins Federal Agencies in Summer Food Drive

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – The DOE is working with the Chief Human Capital Officers Council, Office of Personnel Management and other federal agencies to help stock area food banks as part of the fourth annual Feds Feed Families campaign that runs June through August this year.

  13. Proposed Agency Information Collection: Federal Register Notice Volume 76,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    No. 195 - Oct. 7, 2011 | Department of Energy 95 - Oct. 7, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE is submitting to OMB pursuant to the Paperwork Reduction Act of

  14. Uncle Sam goes to market: Federal agency disposal of emission reduction credits under the Federal property management regulations. Master's thesis

    SciTech Connect (OSTI)

    Rafferty, V.J.

    1994-01-30

    With the realignment and closure of Federal facilities, especially Department of Defense installations, Federal agencies have been presented with a unique opportunity: the chance to create and dispose of air emission reduction credits (ERCs). This situation and current commitments by the Congress and EPA to expand the use of market based pollution control programs have generated interest in certain circles as to whether and how Federal agencies can dispose of ERCs and similar pollution rights and allowances. This paper will discuss ERCs, why the disposal of ERCs by Federal agencies is a pressing issue, and how Federal agencies can dispose of ERCs under existing Federal property laws and regulations.

  15. Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183- Sep. 19, 2008

    Broader source: Energy.gov [DOE]

    Federal Register Notice of proposed rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008

  16. Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA (CEQ, 2000)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to ensure that all federal and non-federal cooperating agencies are identified on the cover sheet of each Environmental Impact Statement (EIS) prepared by your agency.

  17. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread out the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.

  18. FEMP Debuts New eTraining on Sustainable Acquisition for Federal Agencies |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Debuts New eTraining on Sustainable Acquisition for Federal Agencies FEMP Debuts New eTraining on Sustainable Acquisition for Federal Agencies July 20, 2016 - 3:29pm Addthis FEMP Debuts New eTraining on Sustainable Acquisition for Federal Agencies The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) presents Sustainable Acquisition for Federal Agencies, a new eTraining core course. This online course was developed in partnership with the U.S.

  19. PACE and the Federal Housing Finance Agency (FHFA)

    SciTech Connect (OSTI)

    Zimring, Mark; Fuller, Merrian

    2010-03-17

    The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter with guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.

  20. Expanded "Green Button" Will Reach Federal Agencies and More American

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Consumers | Department of Energy "Green Button" Will Reach Federal Agencies and More American Energy Consumers Expanded "Green Button" Will Reach Federal Agencies and More American Energy Consumers December 6, 2013 - 12:50pm Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. Initiatives like Green Button will expand the ways consumers -- from homeowners and renters to federal government agencies -- can interact

  1. U.S. Federal Agencies | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information U.S. Federal Agencies Science Search Tools Home DOE Collections Journal Sources Library and University Tools U.S. Federal Agencies Global Databases Customized Resources This interagency initiative of 19 U.S. government science organizations within 15 Federal Agencies provides a search of over 60 scientific databases and 200 million pages of science information with just one query. Science.gov is a gateway to over 2,200 scientific websites. For more information about

  2. U.S. Federal Agencies | OSTI, US Dept of Energy Office of Scientific...

    Office of Scientific and Technical Information (OSTI)

    Tools Home DOE Collections Journal Sources Library Tools U.S. Federal Agencies Global Databases Customized Resources This interagency initiative of 19 U.S. government science ...

  3. DOE's Use of Federal Power Act Emergency Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On December 14, 2000, a Federal Power Act section 202(c) emergency order was issued in response to the California energy crisis. On August 16, 2002, due to concerns regarding the ...

  4. Section 106 Consultation Between Federal Agencies and Indian Tribes Regarding Federal Permits, Licenses, and Assistance Questions and Answers (ACHP, 2008)

    Broader source: Energy.gov [DOE]

    This Advisory Council on Historic Preservation guidance uses a question-and-answer format to explain issues related to Section 106 consultation between federal agencies and Indian tribes related to permits, licenses, and assistance.

  5. Energy-Efficient Product Procurement for Federal Agencies (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    Overview of the U.S. Department of Energy Federal Energy Management Program Energy-Efficient Product Procurement Program.

  6. Chapter VII Appendix D FEDERAL EMERGENCY AUTHORITIES AND POLICY...

    Office of Environmental Management (EM)

    Gasoline Supply Reserve, and provides for the presidentially directed drawdown of the reserves through the Secretary of Energy. It also authorizes the Secretary of Energy to...

  7. Reporting Guidance for Federal Agency Annual Report on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance includes three attachments that were developed to assist agencies with their reporting requirements. Open the reporting requirements template to access: Attachment 1: ...

  8. Guidance for Federal Departments and Agencies on Establishing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    agencies should engage the public when establishing and ... Environmental Policy Act (85.19 KB) More Documents & Publications 57 Fed Reg 15122: DOE NEPA Implementing ...

  9. Utility Energy Service Contracts for Federal Agencies | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... FUPWG seminars SPIDERS JCTD Strategic partnership meetings Agency partners Utility partners Resources Photo of the inside of a library. UESC Guide Enabling Documents UESC Virtual ...

  10. White House Honors Federal Agencies for Saving Taxpayers $133 Million in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Costs by Increasing Efficiency Measures | Department of Energy Honors Federal Agencies for Saving Taxpayers $133 Million in Energy Costs by Increasing Efficiency Measures White House Honors Federal Agencies for Saving Taxpayers $133 Million in Energy Costs by Increasing Efficiency Measures November 2, 2007 - 4:21pm Addthis Recipients of Presidential Awards for Leadership in Federal Energy Management Recognized WASHINGTON, DC - The White House today honored five energy management teams

  11. NREL Helps Agencies Target New Federal Sustainability Goals ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A map of the United States covered in yellow circles of varying sizes. FEMP and NREL ... The U.S. Department of Energy's Federal Energy Management Program (FEMP) and the Navy are ...

  12. Federal Government Awards Multi-Agency Solar Power Purchase in California,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada | Department of Energy Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, 2015 - 10:30am Addthis The U.S. General Services Administration (GSA), in partnership with the U.S. Department of Energy, U.S. Environmental Protection Agency, and U.S. Forest Service, awarded a contract for the federal government's first-ever joint solar power procurement in California

  13. DOE Partners with Other Federal Agencies Working on the Wind River Indian Reservation

    Broader source: Energy.gov [DOE]

    On May 8 and 9, a joint federal agency collaboration was held to discuss financial and technical assistance to Wind River Tribes in Riverton, Wyoming. Requested by staff from the U.S. Department of...

  14. Other Federal Agency Small Business Innovation Research and Small Business Technology Transfer Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    In addition to the U.S. Department of Energy and the Office of Energy Efficiency and Renewable Energy Small Business and Innovation Research/Small Business Technology Transfer programs, other federal agencies also provide funding through their own programs.

  15. How information resources are used by federal agencies in risk assessment application: Rapporteur summary

    SciTech Connect (OSTI)

    Fenner-Crisp, P.

    1990-12-31

    The application of information available for risk assessment from the federal perspective is described. Different federal agencies conduct varying degrees of hazard evaluation, and some also generate empirical data. The role of the Agency for Toxic Substances and Disease Registry in hazard assessments of potential public health impacts of Superfund sites includes identification of the 275 most significant substances. ATSDR is responsible for preparing toxicological profiles. ATSDR also identifies data gaps and needs critical to adequately assessing human health impacts.

  16. Miscellaneous agreements between the U.S. Department of Energy and Federal, State, and local agencies.

    SciTech Connect (OSTI)

    Meincke, Carol L.

    2010-08-01

    This document identifies and provides access to source documentation for the Site- Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico. Specifically, it lists agreements between the U.S. Department of Energy (DOE), the National Nuclear Security Administration (NNSA), DOE/NNSA/Sandia Site Office (SSO), Sandia Corporation, and local and state government agencies, Department of Defense, Kirtland Air Force Base, and other federal agencies.

  17. Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3/107 Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Implementing Sustainability: The Institutional-Behavioral Dimension Elizabeth L. Malone Tom Sanquist Amy K. Wolfe Rick Diamond Christopher Payne Jerry Dion January 2011 (Updated June 2013) Federal Energy Management Program U.S. Department of Energy DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S.

  18. Optimizing Federal Fleet Vehicle Acquisitions: An Eleven-Agency FY 2012 Analysis

    SciTech Connect (OSTI)

    Singer, M.; Daley, R.

    2015-02-01

    This report focuses on the National Renewable Energy Laboratory's (NREL) fiscal year (FY) 2012 effort that used the NREL Optimal Vehicle Acquisition (NOVA) analysis to identify optimal vehicle acquisition recommendations for eleven diverse federal agencies. Results of the study show that by following a vehicle acquisition plan that maximizes the reduction in greenhouse gas (GHG) emissions, significant progress is also made toward the mandated complementary goals of acquiring alternative fuel vehicles, petroleum use reduction, and alternative fuel use increase.

  19. Federal Awardee Performance and Integrity Information System (FAPIIS) Trailer (Civilian Agency Acquisition Letter 2010-05)

    Broader source: Energy.gov [DOE]

    The Civilian Agency Acquisition Letter 2010-05 encourages the acquisition community to view the FAPIIS trailer for an overview of the FAPIIS requirement. The website to access the FAPIIS trailer is www.fai.gov/FAPIIS/trailer/module.htm. Policy Flash 2010-56 issued Acquisition Guide Chapter 42.16, Reporting Other Contractor Information into the Federal Awardee Performance and Integrity Information System which provides the Department of Energy internal procedures.

  20. DOE Issues Agency Information Collection Extension for OE-417 Form in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued an Agency Information Collection Extension in the Federal Register, notifying the public of an information collection extension and requesting public comments on the revised Form OE-417 "Electric Emergency Incident and Disturbance Report" which is used to report electric emergency incidents and disturbances to DOE. The OE-417 reports enable the DOE to monitor electric emergency incidents and disturbances in the United States so that the Government may help prevent the physical or virtual disruption of the operation of any critical infrastructure.

  1. Legal Authorities for UESC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Authorities for UESC Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 5-6, 2014 Cape Canaveral. Florida General UESC Authority * 42 U.S.C. § 8256(c) - Incentives for Agencies * Agencies may accept any financial incentive, goods, or services generally available from any utility * GSA recognizes financing as an authorized incentive * Guarantee: Savings v. Performance Federal Utility Partnership Working Group November 5-6, 2014 Cape Canaveral, FL Department of Defense

  2. SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION...

    Broader source: Energy.gov (indexed) [DOE]

    act as the lead agency for coordinating all applicable Federal authorizations and related environmental reviews required under Federal law in order to site an electric transmission...

  3. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  4. Federal agencies active in chemical industry-related research and development

    SciTech Connect (OSTI)

    1995-09-29

    The Energy Policy Act of 1992 calls for a program to further the commercialization of renewable energy and energy efficient technologies for the industrial sector.. The primary objective of the Office of Industrial Technologies Chemical Industry Team is to work in partnership with the US chemical industry to maximize economic, energy, and environmental benefits through research and development of innovative technologies. This document was developed to inventory organizations within the federal government on current chemical industry-related research and development. While an amount of funding or number of projects specifically relating to chemical industry research and development was not defined in all organizations, identified were about 60 distinct organizations representing 7 cabinet-level departments and 4 independent agencies, with research efforts exceeding $3.5 billion in fiscal year 1995. Effort were found to range from less than $500 thousand per year at the Departments of Agriculture and the Interior to over $100 million per year at the Departments of Commerce, Defense, Energy, and Health and Human Services and the National Aeronautics and Space Administration. The total number of projects in these programs exceeded 10,000. This document is complete to the extent that agencies volunteered information. Additions, corrections, and changes are encouraged and will be incorporated in future revisions.

  5. UHlfED STATES OF AMERICA BEFORE THE FEDERAL U B O R RElATlONS AUTHORITY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UHlfED STATES OF AMERICA BEFORE THE FEDERAL U B O R RElATlONS AUTHORITY DEPARTMENT 0 1 . ' E3iERGY ALBAkY RESEARCH CEhTER ALBANJ', OREGON -Actlvit)' -Ahill- SATIONAL. FEDEMTION OF FEDERAL EMYLOYEES, LOCAL 1141 -Peti tionerlExclus~v c Repmmbtlve -and- AMENCAN FEDERATION OF GOVERNMENT EMPLOYEES, LOCAL I 104, AFL-CIO CASE NO. SF-RP-90042 Pursuant to Scc [ton 2422 1 of the Regulations of the Federal Labor Relations Authoriry, a pen t ~ o n was Filed seeking to amend rhe rscogni tion granted to the

  6. How information resources are used by federal agencies in risk assessment applications

    SciTech Connect (OSTI)

    Legg, W.E.

    1990-12-31

    This paper discusses the structure and responsibilities of the US Army Toxic and Hazardous Materials Agency.

  7. Agency Financial Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide...

  8. Secretary of Interior's Standards and Guidelines for Federal Agency Historic Preservation Programs Pursuant to the National Historic Preservation Act (Section 110 Guidelines) (NPS, 1998)

    Broader source: Energy.gov [DOE]

    The Secretary of the Interior's Standards and Guidelines for Federal Agency Historic Preservation Programs Pursuant to the National Historic Preservation Act (63 FR 20496; April 24, 1998) are the formal guidance to each Federal agency on meeting the requirements of Section 110 of the National Historic Preservation Act.

  9. Agencies that Have Entered into Federal Energy Management Program Interagency Partnerships

    Broader source: Energy.gov [DOE]

    U.S. Department of Commerce and U.S. Department of the Interior have entered into interagency partnerships with the Federal Energy Management Program.

  10. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: ESCO Selection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4. ESCO SELECTION Best practices for ESCO selection are the following. 4.1 FEMP recommends that agencies use the Selection by Qualifications (SBQ) method (as described in the DOE IDIQ at section H.3.1) and standardize their SBQ process. FEMP ESPC experts and agencies with ESPC experience have observed that the SBQ method can elicit as much useful information for finding the best ESCO for a specific project as other more complex, costly, labor-intensive, and time-consuming methods. Agencies have

  11. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: General Best Practices

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2. GENERAL BEST PRACTICES 2.1 Teamwork is critical to ESPC success. 2.1.1 Designate a project champion who will, along with the agency Contracting Officer (CO), lead the agency team's efforts. The project champion should ensure that team members are trained and stakeholders and decision makers are educated about the project. A committed project champion is a key factor in the success of the project, paving the path forward and building agency support for the project. 2.1.2 Enlist the support of

  12. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8. REVIEW OF THE IGA/PROPOSAL - STRATEGY FOR SUCCESS Agency review of the IGA/proposal has been noted as a potential bottleneck in the ESPC process. To expedite thorough and timely agency review: 8.1 Hold an in-person conference with the ESCO promptly after completion of the IGA to review findings and discuss potential challenges. 8.2 Establish a hard deadline for agency review of the IGA and response to the ESCO. 8.3 Develop a review plan and set aside focused review time. Assign overall review

  13. AGENCY:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    et seq), the U.S. Council on Environmental Quality (CEQ) regulations (40 Code of Federal Regulations ... Based on host-specificity testing conducted in the field in China and in ...

  14. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Measurement and Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1. MEASUREMENT & VERIFICATION 11.1 Agencies should designate a primary contact who is responsible for (1) maintaining contact with FEMP through the Life of Contract program, and (2) maintaining continuity of documentation and awareness of the ESPC throughout the performance period. 11.2 Agencies should designate a government witness to accompany the ESCO during annual measurement and verification activities. Ensure that the government witness has reviewed current FEMP guidance on M&V

  15. Federal Financial Report

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    REPORT (Follow form instructions) 1. Federal Agency and Organizational Element 2. Federal Grant or Other Identifying Number Assigned by Federal Agency Page of to Which Report is ...

  16. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Preliminary Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5. PRELIMINARY ASSESSMENT (PA) 5.1 To get a useful PA from the ESCO, the agency should provide the ESCO with all relevant current information about the facilities, including energy consumption and previous audits. 5.2 The PA should be only as long as necessary to convey the viability of a project. An example/template of a PA can be found at: http://www1.eere.energy.gov/femp/docs/10_patemplate.docx . 5.3 Set deadlines for PA submission and for agency completion of PA review and response to the

  17. Federal Energy Management Laws and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Laws and Requirements Federal Energy Management Laws and Requirements Federal Energy Management Laws and Requirements To help agencies comply with federal laws and requirements, the Federal Energy Management Program (FEMP) analyzes energy management mandates from legal authorities and publishes notices and rules related to federal energy management. FEMP also provides tools to help agencies report annual facility and fleet progress toward federal laws and requirements.

  18. Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA (CEQ, 2010)

    Broader source: Energy.gov [DOE]

    With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review.

  19. Memorandum for Heads of Federal Departments and Agencies: Emergencies and NEPA

    Broader source: Energy.gov [DOE]

    With this Memorandum, the Council on Environmental Quality reiterates its previous guidance on the National Environmental Policy Act (NEPA) environmental review of proposed emergency response actions.This memorandum clarifies that the previous guidance remains applicable to current situations and provides guidance on required agency environmental review.

  20. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Acquisition Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3. ACQUISITION PLANNING 3.1 Define the roles and responsibilities of every ESPC acquisition team member and identify gaps that need to be filled. The rule of thumb is to include on the team all parties who could affect or be affected by the project, at least for periodic consultation. At a minimum, the team should include an agency CO with sufficient warrant, the COR, officials whose approval is required, a budget officer, and legal counsel. 3.2 To avoid miscommunication and maintain

  1. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Final Negotiations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . FINAL NEGOTIATIONS AND TO AWARD 10.1 Know in advance your clear path to award. Know what management, legal, and other reviews are required prior to award. If agency-level review is required, be prepared in advance. 10.2 The financiers need adequate time to give you their best rate. Update the project schedule to detail the final steps required before TO award. Ensure that the ESCO has allowed adequate time in the schedule to obtain multiple financing offers (about 2 weeks). 10.3 Be prepared

  2. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Investment-Grade Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7. INVESTMENT-GRADE AUDIT (IGA) The IGA is the ESCO's detailed survey and analysis which will establish the estimated savings and savings guarantees. The IGA comprises the technical portion of the proposal, detailing ECMs, the M&V plan, and technical specifications. 7.1 Initiate the IGA with a kick-off meeting, which should be the first of continuing bi-weekly agency-ESCO meetings. Bi-weekly meetings can effectively keep the project on track by providing a routine venue for addressing both

  3. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Task Order Request for Proposal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . TASK ORDER REQUEST FOR PROPOSAL (TO-RFP) The TO incorporates the TO-RFP, the ESCO's IGA/proposal, and the IDIQ (the DOE indefinite- delivery, indefinite-quantity contract) - so the agency needs to know what all of them say. The purpose of the TO-RFP is to incorporate site-specific requirements into the TO by modifying, adding to, or deleting IDIQ contract terms, as long as these changes are within the overall scope of the IDIQ. 6.1 Use the FEMP TO-RFP Template, which lists all the DOE IDIQ

  4. Nevada Agreement for Delegation of Federal PSD Program | Open...

    Open Energy Info (EERE)

    of the Federal Prevention of Significant Deterioration Program. Author United States Environmental Protection Agency Recipient State of Nevada Division of Environmental...

  5. Federal Energy Savings Performance Contracting Steering Committee |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Contracting Steering Committee Federal Energy Savings Performance Contracting Steering Committee The Federal Energy Savings Performance Contracting (ESPC) Steering Committee shares experiences and lessons learned and coordinates process and procedural improvements among federal agency implementers to promote improved ESPCs throughout the federal government. This includes: Discussing practical application of the ESPC authority to identify problems, barriers to the

  6. Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans - Implementing Sustainability: The Institutional-Behavioral Dimension

    SciTech Connect (OSTI)

    Malone, Elizabeth L.; Sanquist, Tom; Wolfe, Amy K.; Diamond, Rick; Payne, Christopher; Dion, Jerry

    2013-06-01

    This document is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and maintain federal sustainability goals, while meeting their mission goals. FEMP is developing guidance for federal agency efforts to enable institutional behavior change for sustainability, and for making sustainability “business as usual.” The driving requirement for this change is Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. FEMP emphasizes strategies for increasing energy efficiency and renewable energy utilization as critical components of attaining sustainability, and promotes additional non-energy action pathways contained in EO 13514. This report contributes to the larger goal by laying out the conceptual and evidentiary underpinnings of guidance to federal agencies. Conceptual frameworks focus and organize the development of guidance. We outline a series of progressively refined conceptual frameworks, including a multi-layer approach, key steps in sustainability implementation, a process view of specific approaches to institutional change, the agency Strategic Sustainability Performance Plans (SSPPs), and concepts related to context-specific rules, roles and tools for sustainability. Additionally, we tap pertinent bodies of literature in drawing eight evidence-based principles for behavior change. These principles are important foundations upon which to build in selecting strategies to effect change in organizations. Taken together, this report presents a suite of components that inform the training materials, presentations, web site, and other products that provide guidance to federal agencies.

  7. Federal Energy Management Laws and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laws and Requirements Federal Energy Management Laws and Requirements Federal Energy Management Laws and Requirements To help agencies comply with federal laws and requirements, the Federal Energy Management Program (FEMP) analyzes energy management mandates from legal authorities and publishes notices and rules related to federal energy management. FEMP also provides tools to help agencies report annual facility and fleet progress toward federal laws and requirements. Get Started Start meeting

  8. Proposed Rules Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5383 Vol. 81, No. 21 Tuesday, February 2, 2016 DEPARTMENT OF ENERGY 10 CFR Part 900 RIN 1901-AB36 Coordination of Federal Authorizations for Electric Transmission Facilities AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of proposed rulemaking. SUMMARY: The Department of Energy (DOE) proposes to amend its regulations for the timely coordination of Federal Authorizations for proposed interstate electric transmission facilities pursuant to

  9. Fossil and synthetic fuels: miscellaneous. Part 1. Hearings before the Subcommittee on Fossil and Synthetic Fuels of the Committee on Energy and Commerce, House of Representatives, Ninety-Seventh Congress, First Session on Extension of IEA antitrust defense authorities, February 26, 1981, H. R. 2166, Department of Transportation authorization request, April 8, 1981, Gasohol usage in federal vehicles, July 30, 1981

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Part I of the hearing record covers testimony relating to the extension of antitrust defense availability to the International Energy Agency (IEA); an authorization request by the Department of Transportation (DOT) to comply with pipeline safety regulations; and the administration's reluctance to promote gasohol use in federal vehicles. The first day's hearing included discussion of H.R. 2166, which extended the IEA authority by amending the Energy Policy and Conservation Act, and the testimony of four witnesses representing federal agencies involved in international affairs. On the second day, three DOT witnesses described pipeline-safety programs, enforcement, and procedures, with emphasis on the transport of liquefied natural gas. On the third day, nine witnesses representing gasohol-producing states, the US Army Equipment Research and Development Command, federal fleet services, and DOE examined the appropriateness and compliance record of Executive Order 12261 mandating gasohol for federally owned or leased vehicles. At issue was the need to convert Midwest grains to fuel at a time when oil is plentiful, the performance of alcohol fuels, and the administration's preference for working through the marketplace. Additional material submitted for the record follows each day's testimony. (DCK)

  10. Saint Paul Port Authority PACE Program

    Broader source: Energy.gov [DOE]

     Note:  In 2010, the Federal Housing Finance Agency (FHFA), which has authority over mortgage underwriters Fannie Mae and Freddie Mac, directed these enterprises against purchasing mortgages of...

  11. Reporting Guidance for Federal Agency Annual Report on Energy Management (Per 42 U.S.C. 8258)

    Broader source: Energy.gov [DOE]

    Guidance includes four attachments that were developed to assist agencies with their reporting requirements.

  12. Strengthening Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Office of the Federal Environ- mental Executive, which shall be maintained in the ... Council on, performance by agencies of functions assigned by sections 2 and 3 of this ...

  13. Chronological History of Federal Energy-Efficient Product

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chronological History of Federal Energy-Efficient Product Procurement: Executive, Legislative and Regulatory Requirements, Actions and Mandates Introduction The National Energy Conservation Policy Act (NECPA), signed into law in 1978, is the foundational authority for federal energy management requirements. Various legislative actions and Executive Orders (EOs) have developed purchasing requirements that encompass all areas of federal procurement. Federal agencies have been required to purchase

  14. Federal technology transfer requirements :a focused study of principal agencies approaches with implications for the Department of Homeland Security.

    SciTech Connect (OSTI)

    Koker, Denise; Micheau, Jill M.

    2006-07-01

    This report provides relevant information and analysis to the Department of Homeland Security (DHS) that will assist DHS in determining how to meet the requirements of federal technology transfer legislation. These legal requirements are grouped into five categories: (1) establishing an Office of Research and Technology Applications, or providing the functions thereof; (2) information management; (3) enabling agreements with non-federal partners; (4) royalty sharing; and (5) invention ownership/obligations. These five categories provide the organizing framework for this study, which benchmarks other federal agencies/laboratories engaged in technology transfer/transition Four key agencies--the Department of Health & Human Services (HHS), the U.S. Department of Agriculture (USDA), the Department of Energy (DOE), and the Department of Defense (DoD)--and several of their laboratories have been surveyed. An analysis of DHS's mission needs for commercializing R&D compared to those agencies/laboratories is presented with implications and next steps for DHS's consideration. Federal technology transfer legislation, requirements, and practices have evolved over the decades as agencies and laboratories have grown more knowledgeable and sophisticated in their efforts to conduct technology transfer and as needs and opinions in the federal sector have changed with regards to what is appropriate. The need to address requirements in a fairly thorough manner has, therefore, resulted in a lengthy paper. There are two ways to find summary information. Each chapter concludes with a summary, and there is an overall ''Summary and Next Steps'' chapter on pages 57-60. For those readers who are unable to read the entire document, we recommend referring to these pages.

  15. Agency Financial Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency Financial Reports Agency Financial Reports The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide performance, financial and related information in a more meaningful and useful format. The Department of Energy (Department or DOE) has chosen an alternative reporting to the consolidated Performance and Accountability Report and instead, produces an Agency Financial

  16. Agencies Decide to Dig Up Contaminated Soil at Hanford Site- Federal and state agencies determine cleanup plans for four areas near central Hanford

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. –The Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA), in coordination with the Washington Department of Ecology, have made plans for remediating contaminated soil at four locations in the center of the Hanford Site.

  17. NEW - DOE P 481.1, DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SSP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work.

  18. DOE's Policy Regarding Laboratories, Plants and Sites Engaging in Strategic Partnership Projects with Other Federal Agencies, Independent Organizations, and the Private Sector

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-12-17

    The purpose of this Policy is to set the context in which DOE and its laboratories, plants, and sites should pursue Strategic Partnership Projects (SPP) with other Federal government agencies, state and local institutions, universities, foreign entities and/or private companies. The Policy is applicable to the DOE laboratories, plants, and sites, and to the DOE programs that own them and facilitate their work. Does not cancel/supersede other directives.

  19. Office of Legal Counsel U.S. Department of Justice *1 EFFECT OF APPROPRIATIONS FOR OTHER AGENCIES AND BRANCHES ON THE AUTHORITY TO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    337, 1995 WL 917146 (O.L.C.) Office of Legal Counsel U.S. Department of Justice *1 EFFECT OF APPROPRIATIONS FOR OTHER AGENCIES AND BRANCHES ON THE AUTHORITY TO CONTINUE DEPARTMENT OF JUSTICE FUNCTIONS DURING THE LAPSE IN THE DEPARTMENT'S APPROPRIATIONS December 13, 1995 Where Congress has provided appropriations for the legislative branch, the Department of Justice may continue to provide testimony at hearings and perform other services related to funded functions of the legislative branch

  20. Department of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 100- May 25, 2010

    Broader source: Energy.gov [DOE]

    Department of Energy Proposed Agency Information Collection. The Department of Energy (DOE) invites public comments on DOE's intent to request the Office of Management and Budget (OMB) to extend...

  1. Department of Energy Proposed Agency Information Collection: Federal Register Notice Volume 75, No. 140- Jul. 22, 2010

    Broader source: Energy.gov [DOE]

    Department of Energy proposed Agency Information Collection: The Department of Energy (DOE) invites public comment on DOE’s request to the Office of Management and Budget (OMB) to extend for three...

  2. Authority of states of use section 401 water quality certification to deny or condition Federal Energy Regulatory Commission licenses. Master's thesis

    SciTech Connect (OSTI)

    Hart, E.O.

    1994-09-01

    This thesis discusses a recent United States Supreme Court case that will have a profound influence on the licensure of hydroelectric projects and the related ability of States to protect the quality of their waters. On October 4, 1993, the Supreme Court granted a Writ of Certiorari to resolve a conflict among the state courts of last resort. This case involves two fundamental and competing national interests: the nation's thirst for cheap, dependable power versus its equally strong desire to improve the quality of its water resources. It also involves two underlying regulatory regimes that overlap and conflict with each other in some ways. This case illustrates how those two national interests and their underlying regulatory regimes cannot always be reconciled. It also demonstrates how Congress, with its muddled ways of passing legislation, can create conflicts between federal and state regulatory agencies.

  3. Federal Radiological Monitoring and Assessment Center | National...

    National Nuclear Security Administration (NNSA)

    of Defense (DOD), the Environmental Protection Agency (EPA), the Department of Health and Human Services (HHS), Federal Bureau of Investigations (FBI), and other federal agencies. ...

  4. Funding Mechanisms for Federal Geothermal Permitting (Presentation)

    SciTech Connect (OSTI)

    Witherbee, K.

    2014-03-01

    This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

  5. Federal laboratories for the 21st century

    SciTech Connect (OSTI)

    Gover, J.; Huray, P.G.

    1998-04-01

    Federal laboratories have successfully filled many roles for the public; however, as the 21st Century nears it is time to rethink and reevaluate how Federal laboratories can better support the public and identify new roles for this class of publicly-owned institutions. The productivity of the Federal laboratory system can be increased by making use of public outcome metrics, by benchmarking laboratories, by deploying innovative new governance models, by partnerships of Federal laboratories with universities and companies, and by accelerating the transition of federal laboratories and the agencies that own them into learning organizations. The authors must learn how government-owned laboratories in other countries serve their public. Taiwan`s government laboratory, Industrial Technology Research Institute, has been particularly successful in promoting economic growth. It is time to stop operating Federal laboratories as monopoly institutions; therefore, competition between Federal laboratories must be promoted. Additionally, Federal laboratories capable of addressing emerging 21st century public problems must be identified and given the challenge of serving the public in innovative new ways. Increased investment in case studies of particular programs at Federal laboratories and research on the public utility of a system of Federal laboratories could lead to increased productivity of laboratories. Elimination of risk-averse Federal laboratory and agency bureaucracies would also have dramatic impact on the productivity of the Federal laboratory system. Appropriately used, the US Federal laboratory system offers the US an innovative advantage over other nations.

  6. Federal Register | Open Energy Information

    Open Energy Info (EERE)

    of Federal agencies, and provides a forum for public participation in the democratic process. The publications provide access to a wide range of Federal benefits and...

  7. Draft FY 2012 Agency Financial Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Foreword he Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports to provide performance, financial and related information in a more meaningful and useful format. For Fiscal Year (FY) 2015, the Department of Energy (Department or DOE), has produced an Agency Financial Report, and will provide an Annual Performance Report and a Summary of Performance and Financial Information, pursuant to OMB

  8. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    U.S. Energy Information Administration (EIA) Indexed Site

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it,

  9. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  10. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  11. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  12. Agency-Wide Screening

    Broader source: Energy.gov [DOE]

    Federal agencies face energy-related requirements on new construction projects and major renovations. These Federal requirements range from reductions in fossil-fuel use to specifying the use of...

  13. Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program for Certain Commercial Items | Department of Energy Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter (CAAL) 2013-03 on May 7, 2013; authorizing covered agencies to approve a Class Deviation to remove the dollar limitations on

  14. Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act (CEQ, 2010)

    Broader source: Energy.gov [DOE]

    This guidance from the Council on Environmental Quality provides methods for substantiating categorical exclusions, clarifies the process for establishing categorical exclusions, outlines how agencies should engage the public when establishing and using categorical exclusions, describes how agencies can document the use of categorical exclusions, and recommends periodic agency review of existing categorical exclusions.

  15. Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations

    Broader source: Energy.gov [DOE]

    An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on September 25, 2013. Comments must be received on or before October 31, 2013.

  16. EO 13690: Establishing a Federal Flood Risk Management Standard...

    Office of Environmental Management (EM)

    The amendments require federal agencies to use natural systems, ecosystem processes, and nature-based approaches to identify alternatives and require federal agency regulations or ...

  17. EO 13690 (2015): Establishing a Federal Flood Risk Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The amendments require federal agencies to use natural systems, ecosystem processes, and nature-based approaches to identify alternatives and require federal agency regulations or ...

  18. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  19. Study of Risk Assessment Programs at Federal Agencies and Commercial Industry Related to the Conduct or Regulation of High Hazard Operations

    SciTech Connect (OSTI)

    Bari, R.; Rosenbloom, S.; O'Brien, J.

    2011-03-13

    In the Department of Energy (DOE) Implementation Plan (IP) for Defense Nuclear Facilities Safety Board's Recommendation 2009-1, the DOE committed to studying the use of quantitative risk assessment methodologies at government agencies and industry. This study consisted of document reviews and interviews of senior management and risk assessment staff at six organizations. Data were collected and analyzed on risk assessment applications, risk assessment tools, and controls and infrastructure supporting the correct usage of risk assessment and risk management tools. The study found that the agencies were in different degrees of maturity in the use of risk assessment to support the analysis of high hazard operations and to support decisions related to these operations. Agencies did not share a simple, 'one size fits all' approach to tools, controls, and infrastructure needs. The agencies recognized that flexibility was warranted to allow use of risk assessment tools in a manner that is commensurate with the complexity of the application. The study also found that, even with the lack of some data, agencies application of the risk analysis structured approach could provide useful insights such as potential system vulnerabilities. This study, in combination with a companion study of risk assessment programs in the DOE Offices involved in high hazard operations, is being used to determine the nature and type of controls and infrastructure needed to support risk assessments at the DOE.

  20. Department of Energy Proposed Agency Information Collection:...

    Broader source: Energy.gov (indexed) [DOE]

    to OMB pursuant to the Paperwork Reduction Act of 1995. Federal Register Volume 75 No 100. Federal Register notice for the Department of Energy Proposed Agency Information...

  1. Federal NEPA Contacts | Department of Energy

    Office of Environmental Management (EM)

    CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency ...

  2. Resources for Implementing Federal Energy Savings Performance...

    Broader source: Energy.gov (indexed) [DOE]

    and Lessons Learned for Federal Agency FEMP ESPC Projects: Shares agency experiences ... Practical Guide to Savings and Payments in FEMP ESPC Task Orders: Details acceptable ...

  3. Federal Utility Partnership Working Group GSA Comments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal agencies, international agencies, and ... -franz.stuppard@gsa.gov * Drafting a Justification for ... companies who want the UESC exhibit in their contracts. ...

  4. NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION

    Energy Savers [EERE]

    agency post quarterly on its public Web site, certain statistical data relating to ... Federal agency shall post on its public Web site, in the time, form, and manner ...

  5. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  6. Federal Energy Efficiency through Utility Partnerships

    SciTech Connect (OSTI)

    Not Available

    2007-08-01

    Two-page fact sheet on FEMP's Federal Utility Program that works with federal agencies and their utilities to reduce energy use.

  7. Federal NEPA Contacts | Department of Energy

    Energy Savers [EERE]

    Federal NEPA Contacts CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law...

  8. Nuclear Regulatory Commission Authorization Act for fiscal years 1994 and 1995. Introduced in the Senate of the United States, One Hundred Third Congress, Second Session, July 25, 1994

    SciTech Connect (OSTI)

    1994-12-31

    The report addresses S. 2313 a bill to authorize appropriations for the Nuclear Regulatory Commission (NRC) for fiscal years 1994 and 1995. Congressional oversight of the Federal independent regulatory agencies is a fundamental aspect of the Federal regulatory process to ensure that their responsibilities are properly implemented. The bill amends the Atomic Energy Act of 1954 to strengthen and clarify NRC;s authority.

  9. Templates for Approval to Continue Sponsorship as a Federally Funded Research Development Center (FFRDC) and Authorization for a Management and Operating (M&O) Type of Contract

    Broader source: Energy.gov [DOE]

    The purpose of this Flash is to provide you copies of the subject templates. These templates were developed to standardize the format for approving sponsorship as a FFRDC and authorization to enter into an M&O type of contract. Two versions of each template were developed. One version covers non-competitive extensions and the other covers competitions. Word versions of the four templates will be available in the STRIPES Library.

  10. Colorado geothermal institutional handbook: a user's guide of agencies regulations, permits, and aids for geothermal development

    SciTech Connect (OSTI)

    Coe, B.A.; Forman, N.A.

    1980-01-01

    The following are included: principal state agencies, applicable state legislation, applicable state regulations, local agencies and regulations, federal agencies and regulations, information sources, and agencies and individuals. (MHR)

  11. Sustainability in Existing Federal Buildings

    Broader source: Energy.gov [DOE]

    For meeting federal sustainability requirements, agencies can use evaluation methods, such as benchmarking and energy audits, and planning to make existing buildings energy efficient. Agencies can follow these steps to comply with energy reduction requirements.

  12. Federal ESPC Process Phase 1: Acquisition Planning

    Broader source: Energy.gov [DOE]

    During phase 1 of the energy savings performance contract (ESPC) process, the agency contacts a Federal Energy Management Program (FEMP) federal project executive (FPE) who helps educate the agency about procurement steps that are unique to ESPCs.

  13. FTA- SunLine Transit Agency- Final Report

    Broader source: Energy.gov [DOE]

    Final Report on the Federal Transit Administration, SunLine Transit Agency Cooperative Agreement (Part One)

  14. Class Deviation from Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement at Federal Acquisition Regulation (FAR) 9.4

    Broader source: Energy.gov [DOE]

    Attached is Civilian Agency Acquisition Letter 20 10-02. which recommends that civilian agencies authorize class deviations from FAR provisions 9.406-3(f)(1) and 9.407-3(e)(l), the specific portions of the Federal Awardee Performance and Integrity Information Systems (FAPIIS) rule requiring debarring and suspending officials to enter administrative agreements into the FAPSIIS data system. Accordingly, also attached is the Department of Energy's class deviation suspending compliance with this portion of the FAPIIS rule.

  15. Federal Thought Leaders Roundtable

    Broader source: Energy.gov [DOE]

    FEMP Director Timothy Unruh will facilitate a round table discussion on cutting-edge topics among senior agency officials. Federal thought leaders will share insights, candid assessments, and challenge the status quo.

  16. Federal Water Use Indices

    Broader source: Energy.gov [DOE]

    FEMP provides water use indices as a guide for Federal agencies. Note that each is a rough estimate of water usage at different types of sites. Your site may vary considerably.

  17. Utilities Offering Federal Utility Energy Service Contracts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Utilities Offering Federal Utility Energy Service Contracts Utilities Offering Federal Utility Energy Service Contracts The Energy Policy Act of 1992 (codified as 42 USC Section 8256 (c) Utility Incentive Programs) authorizes and encourages agencies to participate in generally available utility programs to increase energy efficiency; conserve water; or manage electricity demand conducted by gas, water, or electric utilities. The following maps show utility service territories

  18. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  19. Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard builds upon Executive Order (E.O.) 11988 and is to be incorporated into existing Federal department and agency processes used to implement E.O. 11988.

  20. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    grants to Federal agencies to implement energy efficiency and water conservation projects. (See Energy Conservation Program Assistance and Retrofit or Purchase of Any...

  1. Environmentally and Economically Beneficial Practices on Federal...

    Office of Environmental Management (EM)

    Environmentally and Economically Beneficial Practices on Federal Landscaped Grounds This Environmental Protection Agency report contains recommendations for a series of...

  2. Competing Federal Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Opening utility energy service contracts to competing franchised utility companies ensures federal agencies get the best value for their projects.

  3. DOE Releases Federal Building Metering Guidance

    Broader source: Energy.gov [DOE]

    The guidance requires federal agencies to review, revise, and submit to FEMP its metering implementation plan within one year.

  4. Federal Wind Energy Assistance through NREL (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

  5. Federal Utility Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01

    Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

  6. FEDERAL FINANCING PROGRAMS for CLEAN ENERGY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL FINANCING PROGRAMS for CLEAN ENERGY FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY * 2016 | INSIDE COVER THIS PAGE INTENTIONALLY LEFT BLANK FOR PRINTING CONTENTS Foreword 3 Acknowledgements 5 Indexes of Federal Financing Programs for Clean Energy 6 * Federal Financing Programs for Clean Energy by Administering Agency * Federal Financing Programs for Clean Energy by Program Type Profiles of Federal Financing Programs 11 for Clean Energy by Agency * United States Department of Energy (DOE) *

  7. Energy Savings Performance Contract Federal Project Facilitators |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy Savings Performance Contract Federal Project Facilitators Energy Savings Performance Contract Federal Project Facilitators The following are U.S. Department of Energy (DOE) approved project facilitators who are required under the DOE indefinite-delivery, indefinite-quantity contract to develop federal energy savings performance contracts. Name Agencies Served Steve Dunnivant All agencies Shellie Feather All agencies David Frank All agencies Timi Goebel All

  8. Delegation as Officially Designated Federal Security Authority...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Delegate: Mark Whitney, Manager, Oak Ridge Office of Environmental Management Status: Current Effective Date: Sep 27, 2012 Re-delegation Allowed: No...

  9. EPA - State NPDES Program Authority | Open Energy Information

    Open Energy Info (EERE)

    states are authorized to oversee the National Pollutant Discharge Control system. Author Environmental Protection Agency Published Environmental Protection Agency, 2014 DOI Not...

  10. Minority Serving Institutions (MSIs): Bridging the Gap between Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agencies and MSIs | Department of Energy Minority Serving Institutions (MSIs): Bridging the Gap between Federal Agencies and MSIs Minority Serving Institutions (MSIs): Bridging the Gap between Federal Agencies and MSIs Different Minority Serving institutions Minority Serving Institutions (MSIs): Bridging the Gap between Federal Agencies and MSIs (1.04 MB) More Documents & Publications Bridging the Gap Between Federal Agencies and MSIs Research and Services at the Alabama A&M

  11. Annual report to Congress on Federal Government Energy Management and Conservation Programs

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report on Federal Energy Management for Fiscal year (FY) 1992 provides information on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet the statutory requirements of Title V, Part 3, of the National Energy Conservation Policy Act (NECPA), as amended, 42 U.S.C. 8251-8261, and Title VIII of NECPA, 42 U.S.C. 8287-8287b. This report also describes the energy conservation and management activities of the Federal Government under the authorization of section 381 of the Energy Policy and Conservation Act (EPCA), as amended, 42 U.S.C. 6361. Implementation activities undertaken during FY 1992 by the Federal agencies under Executive Order 12759 on Federal Energy Management are also described in this report.

  12. Notices ENVIRONMENTAL PROTECTION AGENCY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41 Federal Register / Vol. 80, No. 243 / Friday, December 18, 2015 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9024-5] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www2.epa.gov/nepa. Weekly receipt of Environmental Impact Statements Filed 12/07/2015 Through 12/11/2015 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on

  13. Performance Assurance for Multi-Year Contracts Under the Utility Incentive Program; Federal Energy Management Program (FEMP) Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Federal Energy Management Program Leading by example, saving energy and taxpayer dollars in federal facilities Fact Sheet Section 152(f) of the Energy Policy Act of 1992 (EPACT) Public Law 102-486 autho- rized and encouraged Federal agencies to participate in programs to increase energy efficiency and for water conservation or the management of electricity demand conducted by gas, water, or electric utili- ties. Additionally Title 10 Section 2913 and 10 USC 2866 (a) authorizes and

  14. Federal Advisory Committee Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Advisory Committee Management Federal Advisory Committee Management The Federal Advisory Committee Management Program assures the Department of Energy's overall compliance with the Federal Advisory Committee Act (FACA). The program is located in the Office of the Executive Secretariat. Federal Advisory Committee Act The Federal Advisory Committee Act of 1972 (Public Law 92-463) establishes the policies and minimum requirements for Federal agencies to manage and administer advisory

  15. Federal Renewable Energy Project Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Federal Renewable Energy Project Assistance Federal agencies can get renewable energy project assistance from the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), DOE national laboratories, and other federal agencies. FEMP also offers training to help agencies understand federal renewable energy requirements and goals, and provides renewable energy maps, tools, and a list of federal renewable energy projects. Assistance from FEMP FEMP offers renewable energy

  16. Federal Interagency Geothermal Activities

    SciTech Connect (OSTI)

    Anderson, Arlene; Prencipe, Loretta; Todaro, Richard M.; Cuyler, David; Eide, Elizabeth

    2011-06-01

    This collaborative document describes the roles and responsibilities of key Federal agencies in the development of geothermal technologies including the U.S. Department of Energy (DOE); the U.S. Department of Agriculture (USDA), including the U.S. Forest Service; the U.S. Department of Interior (DOI), including the United States Geological Survey (USGS) and Bureau of Land Management (BLM); the Environmental Protection Agency (EPA); and the Department of Defense (DOD).

  17. Department of Energy: Results From The 2013 Federal Employee...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Employee Viewpoint Survey Results Employees Influencing Change Department of ... Agency Component ...... 32 Appendix E: Employee Engagement - Percent Positive by Agency ...

  18. Executive Order 12088: Federal Compliance with Pollution Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2088: Federal Compliance with Pollution Control Standards Executive Order 12088: Federal Compliance with Pollution Control Standards The head of each Executive agency is ...

  19. Federal Energy Management Program Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  20. 2015 Federal Real Property Council Reporting Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Federal Real Property Council Reporting Guidance 2015 Federal Real Property Council Reporting Guidance Real Property Reporting: EO 13327 requires agencies to report annually ...

  1. Requirements for Renewable Energy on Federal Sites | Department...

    Broader source: Energy.gov (indexed) [DOE]

    There are four federal guidelines for renewable energy projects. The Energy Policy Act of 2005 (EPAct 2005) sets the primary renewable energy requirements for federal agencies, and ...

  2. Federal Fleet Files, FEMP, Vol. 2, No. 8 - June 2010

    SciTech Connect (OSTI)

    2010-06-10

    June 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  3. Federal Fleet Files, FEMP, Vol. 2, No. 12 - November 2010

    SciTech Connect (OSTI)

    2010-11-12

    November 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  4. Advanced Technology Planning for Federal Energy Savings Performance Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program helps agencies to identify and plan opportunities to deploy advanced technologies through federal energy savings performance contracts (ESPCs).

  5. Federal Fleet Files, FEMP, Vol. 2, No. 23- December 2009

    SciTech Connect (OSTI)

    2009-12-08

    December 2009 update of monthly news from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  6. Federal Fleet Files, FEMP, Vol. 2, No. 5 - March 2010

    SciTech Connect (OSTI)

    2010-03-02

    March 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  7. Making a Difference: Federal Energy Management Down on the Farm...

    Office of Environmental Management (EM)

    Addthis Related Articles Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Energy Department Investment Drives Clean Energy Innovation at Federal ...

  8. Federal Fleet Files, FEMP, Vol. 1, No. 3 - July 2009

    SciTech Connect (OSTI)

    2009-07-24

    July 2009 issue of the monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  9. Sustainable Federal Fleets Catalog of Services | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    services it offers for federal agencies that want to implement sustainable fleet projects. Download the Sustainable Federal Fleets Catalog of Services. (377.78 KB) More Documents & ...

  10. Federal Fleet Files, FEMP, Vol. 2, No. 9 - July 2010

    SciTech Connect (OSTI)

    2010-07-06

    July 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  11. Federal Fleet Files: Vol. , No. 1 - October 2009

    SciTech Connect (OSTI)

    2009-10-04

    October 2009 issue of monthly news from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  12. Federal Fleet Files, FEMP, Vol. 2, No. 4 - January 2010

    SciTech Connect (OSTI)

    2010-01-05

    January 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  13. Federal Fleet Files, FEMP, Vol. 2, No. 11 - October 2010

    SciTech Connect (OSTI)

    2010-10-19

    October 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  14. Federal Fleet Files, FEMP, Vol. 2, No. 10 - September 2010

    SciTech Connect (OSTI)

    2010-09-07

    September 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  15. Export Authorizations - Procedures | Department of Energy

    Energy Savers [EERE]

    Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

  16. Proposed Agency Information Collection: Federal Register Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to request OMB to renew Information Collection Request Title: OE Recovery Act ... for submission to the Office of Management and Budget (OMB) pursuant to the ...

  17. Federal Emergency Management Agency | Open Energy Information

    Open Energy Info (EERE)

    new construction, is an important element in making flood insurance available to home and business owners. Currently over 20,100 communities voluntarily adopt and enforce local...

  18. Memorandum of Understanding, Responsibilities of Federal Agencies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 12, 2013 DOE and the Department of the Interior's Fish and Wildlife Service ... DOE and the Department of the Interior's Fish and Wildlife Service (FWS) have entered ...

  19. NREL: Technology Deployment - Federal Agency Technical Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Park Service From Prison Cells to Solar Cells: Alcatraz Island Goes Green U.S. Department of Energy As a DOE laboratory, NREL works hand-in-hand with the DOE to help ...

  20. Author Select

    Office of Scientific and Technical Information (OSTI)

    Authors Please use the pane on the left to start the selection process.

  1. Microsoft Word - Agencies Publish Final Environmental Impact...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    region's increasing energy demands while mitigating potential harmful effects to the environment. "Up to now, Federal land management agencies have often designated energy...

  2. PP-51 Comision Federal De Electricidad | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Comision Federal De Electricidad PP-51 Comision Federal De Electricidad Presidential Permit authorizing Comision Federal De Electricidad to construct, operate and maintain ...

  3. PP-75 The Comision Federal de Electricidad | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 The Comision Federal de Electricidad PP-75 The Comision Federal de Electricidad Presidential Permit authorizing The Comision Federal de Electricidad to construct, operate, and ...

  4. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  5. Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act (CEQ, 2002)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to ensure that all Federal agencies are actively considering the designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that Federal agencies actively participate as cooperating agencies in other agency’s NEPA processes.

  6. Award Categories Federal Small Business

    Energy Savers [EERE]

    ... WAPA also markets power from the Navajo Generating Station coal-fired plant near Page, Arizona. WAPA sells its power to preference customers such as Federal and State agencies, ...

  7. Federal Buildings Personnel Training Act of 2010

    Broader source: Energy.gov [DOE]

    On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

  8. Federal Flood Risk Management Standard (2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  9. Federal Flood Risk Management Standard (FEMA, 2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  10. Guiding Principles for Sustainable Federal Buildings | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Energy Management Program (FEMP) provides guidance to help agencies comply with ... and the updated 2016 Guiding Principles, FEMP developed two crosswalk guidance documents ...

  11. Federal Energy Savings Performance Contract Training | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Management Program (FEMP) offers specialized training about federal energy savings ... FEMP strongly recommends that agency acquisition teams take advantage of FEMP's free ESPC ...

  12. Federal Energy Management Program (FEMP) Training Resources ...

    Open Energy Info (EERE)

    Management Program (FEMP) Training Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Federal Energy Management Program (FEMP) Training Resources AgencyCompany...

  13. Funding Federal Energy and Water Projects (Fact Sheets)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Overview of alternative financing mechanisms available to Federal agencies to fund renewable energy and energy efficiency projects.

  14. Alternative Financing for Federal Energy and Water Projects (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-04-01

    Overview of alternative financing mechanisms avaiable to Federal agencies to fund renewable energy and energy efficiency projects.

  15. Guideline for Water and Energy Considerations During Federal Data Center Consolidations

    SciTech Connect (OSTI)

    William Tschudi

    2013-12-01

    Document assists Federal agencies in making key data center consolidation and optimization decisions.

  16. Guideline for Water and Energy Considerations During Federal Data Center Consolidations

    Broader source: Energy.gov [DOE]

    Document assists Federal agencies in making key data center consolidation and optimization decisions.

  17. Metering in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Maintenance » Metering in Federal Buildings Metering in Federal Buildings The U.S. Department of Energy is required by the Energy Policy Act of 2005 and Executive Order 13693 to establish guidelines for agencies to meter their federal buildings for energy (electricity, natural gas, and steam) and water use. To help agencies meet these metering requirements, the Federal Energy Management Program (FEMP) provides guidance materials, an implementation plan template, and a best practices

  18. Federal Employee Viewpoint Survey | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Guidance » Human Capital Management » Federal Employee Viewpoint Survey Federal Employee Viewpoint Survey The Federal Employee Viewpoint Survey (FedView survey) is a tool that measures employees' perceptions of whether, and to what extent, conditions characterizing successful organizations are present in their agencies. Survey results provide valuable insight into the challenges agency leaders face in ensuring the Federal Government has an effective civilian workforce and how well

  19. Federal Thought Leaders Roundtable Video

    Broader source: Energy.gov [DOE]

    Federal Energy Managment Program (FEMP) Director Timothy Unruh will facilitate a roundtable discussion among senior agency officials on cutting-edge topics related to federal sustainability goals, policy, and initiatives. Panelists will review innovative project case studies and share insights and strategies for replicating them. This FEMP First Thursday Seminar is scheduled for June 2, 2016.

  20. 30-Day Federal Register Notice - Proposed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed Proposed Agency Information Collection 30-Day Federal Register Notice - Proposed (41.58 KB) More Documents & Publications 30 Day Federal Register Notice Proposed - FINAL 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Extension

  1. Author Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy (DOE). Authors of publications are required to report all ALS-related work, i.e., journal articles, conference presentations, books or book chapters, theses,...

  2. State-federal interactions in nuclear regulation

    SciTech Connect (OSTI)

    Pasternak, A.D.; Budnitz, R.J.

    1987-12-01

    The Atomic Energy Act of 1954 established, and later Congressional amendments have confirmed, that except in areas which have been explicitly granted to the states, the federal government possesses preemptive authority to regulate radiation hazards associated with the development and use of atomic energy. Since the passage of the original Act, numerous decisions by the courts have reaffirmed the legitimacy of federal preemption, and have defined and redefined its scope. In this study, the aim is to explore the underlying issues involved in federal preemption of radiation-hazard regulation, and to recommend actions that the Department of Energy and other agencies and groups should consider undertaking in the near term to protect the preemption principle. Appropriate roles of the states are discussed, as well as recent state-level activities and their rationale, and several current arenas in which state-federal conflicts about regulation of hazards are being played out. The emphasis here is on four particular arenas that are now important arenas of conflict, but the issues discussed are far broader in scope. These four arenas are: state-level moratorium activity; emergency planning for reactors; conflicts arising from state financial regulation; and inroads in federal preemption through litigation under state law.

  3. Zarb Appointed to Lead the Federal Energy Administration | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Zarb Appointed to Lead the Federal Energy Administration Zarb Appointed to Lead the Federal Energy Administration Washington, DC President Ford appoints Frank Zarb to be the first Administrator of the newly created Federal Energy Agency

  4. Federal Fleet Files: Vol. 1, No. 2 - June 2009

    SciTech Connect (OSTI)

    2009-06-12

    June 2009 issue of the FEMP Federal Fleet Files monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  5. Search for Efficient Technologies and Products for Federal Facilities

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program provides information and resources about energy- and water-efficient technologies and products that are well suited for federal applications and can help agencies meet federal laws and requirements.

  6. Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SMALL BUSINESS PROGRAM The Federal Energy Management Program (FEMP) is a U.S. Department of Energy (DOE) program focused on reducing the federal government's energy consumption by providing federal agencies with information, tools, and assistance toward tracking and meeting energy- related requirements and goals. FEMP seeks contracts with small businesses to aid in this effort. This fact sheet outlines essential resources and tips to get you started in small business contracting with FEMP.

  7. Author Select

    Office of Scientific and Technical Information (OSTI)

    Author Select Last Name First Name search Type in a name, or the first few letters of a name, in one or both of appropriate search boxes above and select "Go". An attempt will be made to match authors that most closely relate to the text you typed.

  8. Formal guidance for the use of science in EIA: Analysis of agency procedures for implementing NEPA

    SciTech Connect (OSTI)

    Malik, M.; Bartlett, R.V. . Dept. of Political Science)

    1993-01-01

    The authors undertake here an analysis and evaluation of official department and agency procedures for implementing the National Environmental Policy Act (NEPA). They assess the extent to which these procedures provide implementing guidance, beyond that provided by the Council on Environmental Quality (CEQ) regulations themselves, for those provisions of NEPA and the regulations pertaining to scientific integrity, content, and methodology. They analyze and evaluate content using criteria explicit or implicit in NEPA and the regulations, finding that many federal agencies still require little attention to scientific precepts and methodology in the implementation of NEPA. The substantive guidance provided by agencies on conceptual and methodological questions is general and, with few exceptions, minimal.

  9. Author Select

    Office of Scientific and Technical Information (OSTI)

    Selection List Select "add" or "add all", which appear after author's names in the middle pane, to add to the search strategy that appears in this pane. Return to Search >>

  10. Author Select

    Office of Scientific and Technical Information (OSTI)

    Author Select Last Name First Name search Type in a name, or the first few letters of a name, in one or both of appropriate search boxes above and select "Go". An attempt will be...

  11. Author Select

    Office of Scientific and Technical Information (OSTI)

    Selection List Select "add" or "add all", which appear after author's names in the middle pane, to add to the search strategy that appears in this pane. Return to Search >>

  12. Elink - Authorities

    Office of Scientific and Technical Information (OSTI)

    Authorities These authority lists are established and used by DOE to standardize information in bibliographic records. Language, sponsoring organizations, originating research organizations, subject categories, and country of publication must be entered in required formats to optimize search and retrieval. The DOE Order 241.1B requires that DOE-funded STI include attribution to the sponsoring program with wording including DOE, the DOE program office, and the program office's subprogram(s)

  13. THE FEDERAL ENERGY ADMINISTRATION By Roger Anders

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ENERGY ADMINISTRATION By Roger Anders November 1980 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction For the three-year period between 1974 and 1977, the Federal Energy Administration implemented federal oil allocation and pricing regulations. An independent agency, the Federal Energy Administration was the successor of the Federal Energy Office, a short-term organization created to coordinate the

  14. H. R. 1271: A Bill to authorize appropriations for the Office of Environmental Quality for fiscal years 1992, 1993, 1994, 1995, and 1996; to ensure consideration of the impact of Federal actions on the global environment; and for other purposes, introduced in the House of Representatives, One Hundred Second Congress, First Session, March 5, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This bill was introduced into the US House of Representatives on March 5, 1991 to amend the National Environmental Policy Act of 1969. The objective of the bill is to authorize appropriations for the Office of Environmental Quality for fiscal years 1992, 1993, 1994, 1995, and 1996. In addition, it will ensure consideration of the impact of federal actions on the global environment.

  15. Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RIN 3150-AJ48 Definition of a Utilization Facility AGENCY: Nuclear Regulatory Commission. ... the application assigned docket number 50- 608, to the definition of utilization facility. ...

  16. Environmental Protection Agency | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Environmental Protection Agency Third interagency WINGS exercise The third Interagency Aerial Response WINGS exercise, sponsored by the Federal Emergency Management Agency (FEMA), and hosted by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), will be held June 20 - 24, 2016 in Ocean County, New Jersey. On June 21, 2016 through

  17. From Federal Computer Week:

    National Nuclear Security Administration (NNSA)

    Federal Computer Week: Energy agency launches performance-based pay system By Richard W. Walker Published on March 27, 2008 The Energy Department's National Nuclear Security Administration has launched a new performance- based pay system involving about 2,000 of its 2,500 employees. NNSA officials described the effort as a pilot project that will test the feasibility of the new system, which collapses the traditional 15 General Schedule pay bands into broader pay bands. The new structure

  18. Proposed Rules Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7963 Vol. 79, No. 128 Thursday, July 3, 2014 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket No. EERE-2013-BT-NOC-0039] Appliance Standards and Rulemaking Federal Advisory Committee: Cancellation of Open Meetings AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of cancellation of open meetings. SUMMARY: The Department of Energy (DOE) announces the cancellation of open meetings for the Commercial and Industrial Pumps Working Group of the Appliance

  19. Federal Sector

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  20. Notices DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4008 Federal Register / Vol. 80, No. 204 / Thursday, October 22, 2015 / Notices DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2015-0006] Guidelines for Implementing Executive Order 11988, Floodplain Management, and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice. SUMMARY: This notice serves to

  1. The EURATOM Supply Agency

    SciTech Connect (OSTI)

    Lightner, J.

    1989-11-01

    With the coming liberalization of trade and industry within the European Community (EC) and a more centrally-coordinated EC external trade policy, it is timely to ask if in the 1990s there will be any significant changes in the commercial relations between the EC and non-EC companies trading in nuclear fuel. The key vehicle for implementing any change of policy would probably be the European Atomic Energy Community (EURATOM) Supply Agency in Brussels, which is charged under the EURATOM Treaty with overseeing the equitable supply of nuclear fuel to and among EC companies. The EURATOM Supply Agency (the Agency) is a signatory to almost all EC-company contracts for transactions that occur on the territory of the Community, which includes Belgium, Denmark, France, the Federal Republic of Germany (FRG), Great Britain, Greece, Ireland, Italy, Luxembourg, the Netherlands, Portugal, and Spain. During the 1980s, the Supply Agency has rarely tried to influence the commercial decisions of EC member companies. The nuclear fuel industry has largely perceived the Agency as an administrative office that registers contracts and maintains relations with some outside governments, particularly Australia, Canada, and the USA. However, in 1988 the Agency began to have a more direct commercial impact when it reviewed the practice-previously conducted routinely by the EURATOM Safeguards Directorate in Luxembourg at the request of EC-member companies-of swapping safeguards obligations on equivalent quantities of uranium at different locations (flag swapping). The Agency`s actions inhibiting flag swaps, as well as a related de facto policy restricting material swaps of Southern African uranium, caused it to be viewed as obstructive by some EC companies. During 1989 the discussion about flag swaps and swaps involving South African and Namibian uranium has subsided, and a far-reaching discussion has arisen about EC trade policy in general.

  2. Obama Administration Launches $26 Million Multi-Agency Competition to Strengthen Advanced Manufacturing Clusters Across the Nation

    Broader source: Energy.gov [DOE]

    Fourteen Federal Agencies Collaborate to Enhance Global Competitiveness of U.S. Manufacturers and Create Jobs

  3. About Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Energy savings performance contracts (ESPCs) are a partnership between a federal agency and an energy service company (ESCO). After being selected for a potential award, the ESCO conducts a comprehensive facility energy audit and identifies improvements to save energy. In consultation with the agency, the ESCO designs and constructs a project that meets the agency's needs and arranges financing to pay for the project.

  4. FederalRegisterEaNotice.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Administration | (NNSA) Federal Radiological Monitoring and Assessment Center The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal asset available on request by the Department of Homeland Security (DHS) and state and local agencies to respond to a nuclear or radiological incident. The FRMAC is an interagency organization with representation from the NNSA, the Department of Defense (DOD), the Environmental Protection Agency (EPA), the Department of Health

  5. Federal Register

    Office of Environmental Management (EM)

    Federal Real Property Council Guidance for Improved Asset Management December 22, 2004 Federal Real Property Council Guidance for Improved Asset Management Table of Contents I. Overview............................................................................. 1 II. Guiding Principles .................................................................... 3 III. Asset Management Plan - Required Components............................... 4 IV. Asset Management Plan - "Shelf

  6. Effects of Climate Change on Federal Hydropower (Report to Congress)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities

  7. Chapter 1: Energy Challenges | Agency Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Science and Energy Program Workshops ENERGY U.S. DEPARTMENT OF Quadrennial Technology Review 2015 1 Quadrennial Technology Review 2015 Agency Information Chapter 1: Supplemental Information Agency Information Many Federal Departments and Agencies conduct research, development, demonstration, and deployment (RDD&D) activities, policy and regulatory activities, and other actions related to clean energy technologies, as do many State Agencies. The following websites provide a starting point for

  8. Project Facilitators for Federal Energy Savings Performance Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Project Facilitators for Federal Energy Savings Performance Contracts Project Facilitators for Federal Energy Savings Performance Contracts Federal agencies developing U.S. Department of Energy (DOE) energy savings performance contract (ESPC) projects are required to work with a DOE-approved federal project facilitator (PF). PFs are experienced, unbiased advisors who guide the agency acquisition team through the ESPC process. The Federal Energy Management Program (FEMP)

  9. Renewable Energy Projects at Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects at Federal Facilities Renewable Energy Projects at Federal Facilities The Federal Energy Management Program (FEMP) tracks the following examples of renewable energy projects at federal facilities. To find a federal renewable energy project, browse the table by agency, technology, or project financials, or search by keyword. Click a column heading to sort the table. Case studies are also available. Contact FEMP to add your renewable energy project to the table below. Agency,

  10. Federal Sustainability/Energy Scorecard Goals | Department of Energy

    Office of Environmental Management (EM)

    of Energy Planning and Implementation Federal Renewable Energy Project Planning and Implementation The Federal Energy Management Program (FEMP) provides federal agencies with information about planning and implementing renewable energy projects. Whether integrated into existing buildings or part of new construction, renewable energy projects help agencies meet federal laws and requirements, including the Executive Order 13693 30% by 2025 goal and the goal for new federal buildings entering