2012 Quality Assurance Improvement Project Plan | Department...  

Office of Environmental Management (EM)

2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of...

2

2012 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HQ/EFCOG Project Plan Rev. 0 DOE HQ/EFCOG Project Plan Rev. 0 2 Office of Environmental Management and Energy Facility Contractors Group 2012 Quality Assurance Improvement Project Plan Introduction: This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. The joint EM-EFCOG approach to enhancing QA signifies the inherent commitment to partnership and collaboration that is required between the contractor community and DOE to proactively improve performance of the EM mission and projects. This mandate is more

3

2010 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HQ/EFCOG Project Plan HQ/EFCOG Project Plan 2 Office of Environmental Management and Energy Facility Contractors Group 2010 Quality Assurance Improvement Project Plan Introduction: This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. The joint EM-EFCOG approach to enhancing QA signifies the inherent commitment to partnership and collaboration that is required between the contractor community and DOE to proactively improve performance of the EM mission and projects. This mandate is more

4

2015 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE))

This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently.

5

2014 Quality Assurance Improvement Project Plan  

Energy.gov (U.S. Department of Energy (DOE))

This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently.

6

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

7

Safety Assurance Review Plan for: EBWB Interceptor Connection Project  

E-Print Network (OSTI)

#12;Safety Assurance Review Plan for: EBWB Interceptor Connection Project City of Dallas Fort REVIEW 9. REVIEW PLAN APPROVAL AND UPDATES 10. REVIEW PLAN POINTS OF CONTACT ATTACHMENT 1: PROJECT MAP ATTACHMENT 2: PROPOSED SCHEDULE AND COSTS ATTACHMENT 3: TEAM ROSTERS ATTACHMENT 4: REVIEW PLAN

US Army Corps of Engineers

8

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan  

SciTech Connect

Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

Fix, N. J.

2008-03-12T23:59:59.000Z

9

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan  

SciTech Connect

The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Fix, N. J.

2007-01-10T23:59:59.000Z

10

Project Specific Quality Assurance Plan (QAPP)  

SciTech Connect

The Project QAPP`s describe the program and the planned actions which WHC will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C. The Project involves retrieving the high-heat waste from Tank 241-C-106 to close the safety issue associate with the tank, demonstrate initial waste retrieval technology for a Single Shell Tank, and provide feed for the Hanford Waste Vitrification Plant.

Huston, J.J.

1994-11-01T23:59:59.000Z

11

The Groundwater Performance Assessment Project Quality Assurance Plan  

SciTech Connect

U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Luttrell, Stuart P.

2006-05-11T23:59:59.000Z

12

The Groundwater Performance Assessment Project Quality Assurance Plan  

SciTech Connect

This document provides the quality assurance guidelines that will be followed by the groundwater project.

Walker, Thomas G.

2005-01-26T23:59:59.000Z

13

Quality assurance program plan for cesium legacy project  

SciTech Connect

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

14

Near Facility Environmental Monitoring Quality Assurance Project Plan  

SciTech Connect

This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

MCKINNEY, S.M.

2000-05-01T23:59:59.000Z

15

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East  

E-Print Network (OSTI)

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East Dakota County, Minnesota\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2.1.doc A2 Table\\19\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2

Netoff, Theoden

16

Large hadron collider (LHC) project quality assurance plan  

SciTech Connect

The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

2002-09-30T23:59:59.000Z

17

E-Print Network 3.0 - assurance plan project Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

for NRDA followed standard operating procedure (SOP), water sampling plans, Summary: procedures, and NOAA's Analytical Quality Assurance Project Plan (QAPP). Samples were sent...

18

Legacy Management CERCLA Sites Quality Assurance Project Plan  

SciTech Connect

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

none,

2007-05-03T23:59:59.000Z

19

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE))

Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel.

20

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

NAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site  

E-Print Network (OSTI)

Requirements for Quality Assurance Project Plans," United States Environmental Protection Agency, OfficeNAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site Effective Date April 5, 2014 WIPP/QAPP-1 National Analytical Radiation Environmental Laboratory Office of Radiation

22

Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan  

SciTech Connect

A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

Stringfellow, William T.

2005-05-13T23:59:59.000Z

23

Quality Assurance (QA) Program Plan Conceptual Design Phase of Project W-521 Waste Feed Delivery Systems [SUPERSEDED BY RPP-6649 Rev. 0  

SciTech Connect

The Quality Assurance Program Plan (QAPP) describes the quality assurance implementation strategy for Project W-521 during conceptual design.

WHITE, K.A.

2000-08-02T23:59:59.000Z

24

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network (OSTI)

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

25

Software Quality Assurance Plan Example | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assurance Plan Example Software Quality Assurance Plan Example An example of a software quality assurance plan developed from an actual DOE project SQA plan based on DOE G...

26

The Soils and Groundwater EM-20 S&T Roadmap Quality Assurance Project Plan  

SciTech Connect

The Soils and Groundwater EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

Fix, N. J.

2008-02-11T23:59:59.000Z

27

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

28

Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan  

SciTech Connect

This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

Fix, N. J.

2008-03-28T23:59:59.000Z

29

Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1  

SciTech Connect

This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

NONE

1997-04-14T23:59:59.000Z

30

PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan  

SciTech Connect

In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-02T23:59:59.000Z

31

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT QUALITY ASSURANCE IMPROVEMENT INITIATIVE EM CENTRALIZED TRAINING PLATFORM PROJECT PLAN Prepared by: Date: Approved by: Date: Revision 0 Page 3 of 30 05/11/09 1.0 INTRODUCTION The Department of Energy (DOE) expertise in quality assurance (QA) has degraded significantly over the last 10 years due to workforce attrition and the lack of emphasis on QA principles. Since the 2007 establishment and subsequent implementation of the Office of Environmental Management (EM) Quality Assurance Improvement Initiative, the need for trained QA specialists and personnel familiar with the role of QA in integrated safety management and project management is becoming critical. As EM Field Offices struggle to identify sufficient resources to properly implement the EM Quality

32

Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.  

SciTech Connect

This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

Holland, Robert C.

2005-09-01T23:59:59.000Z

33

The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan  

SciTech Connect

Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-29T23:59:59.000Z

34

Global Threat Reduction Initiative Fuel-Thermo-Physical Characterization Project Quality Assurance Plan  

SciTech Connect

The charter of the Fuel Thermo-Physical Characterization Project is to ready Pacific Northwest National Laboratory (PNNL) facilities and processes for the receipt of unirradiated and irradiated low enriched uranium (LEU) molybdenum (U-Mo) fuel element samples, and to perform analysis to support the Global Threat Reduction Initiative conversion program. PNNLs support for the program will include the establishment of post-irradiation examination processes, including thermo-physical properties, unique to the U.S. Department of Energy laboratories. These processes will ultimately support the submission of the base fuel qualification (BFQ) to the U.S. Nuclear Regulatory Commission (NRC) and revisions to High Performance Research Reactor Safety Analysis Reports to enable conversion from highly enriched uranium to LEU fuel. This quality assurance plan (QAP) provides the quality assurance requirements and processes that support the NRC BFQ. This QAP is designed to be used by project staff, and prescribes the required management control elements that are to be met and how they are implemented. Additional controls are captured in Fuel Thermo-Physical Characterization Project plans, existing procedures, and procedures to be developed that provide supplemental information on how work is conducted on the project.

Pereira, Mario M.; Slonecker, Bruce D.

2012-06-01T23:59:59.000Z

35

Quality assurance program plan fuel supply shutdown  

SciTech Connect

This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

Metcalf, I.L.

1998-09-21T23:59:59.000Z

36

Performance assurance program plan  

SciTech Connect

B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

Rogers, B.H.

1997-11-06T23:59:59.000Z

37

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, S.K.

2002-01-31T23:59:59.000Z

38

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, Susan Kay; Orchard, B. J.

2002-01-01T23:59:59.000Z

39

Quality Assurance Program Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Program Plan Quality Assurance Program Plan Quality Assurance Program Plan The achievement of quality in LM activities and products requires implementation of a formal Quality Assurance (QA) Program. This program establishes principles, requirements, practices, and methods for integrating quality into the daily operations of our programs and projects. The QA Program functions as a management tool to ensure that quality objectives are achieved throughout LM's technical, administrative, and operational functions. Achieving quality is the responsibility of managers as well as those who perform the work. Each employee is expected to do the job in accordance with procedures and other requirements. The name LM must represent quality to us, our customers, our service providers, and our

40

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-03-01T23:59:59.000Z

42

Waste Management Quality Assurance Plan  

SciTech Connect

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

43

NMMSS Software Quality Assurance Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NMMSS Software Quality Assurance Plan NMMSS Software Quality Assurance Plan The Software Quality Assurance Plan (SQAP) for the Nuclear Materials Management and Safeguard System...

44

Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant`s QA programs that are necessary for this project.

NONE

1996-07-01T23:59:59.000Z

45

Designing and Implementing Effective Performance Assurance Plans...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

performance assurance planning and process, including performance-based contracts, and measurement and verification protocols. fupwgfall12anderson.pdf More Documents &...

46

Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan  

SciTech Connect

The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

Fix, N. J.

2008-01-07T23:59:59.000Z

47

Quality Assurance Project Plan for the treatability study of in situ vitrification of Seepage Pit 1 in Waste Area Grouping 7 at Oak Ridge National Laboratory  

SciTech Connect

This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, using driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.

NONE

1995-07-01T23:59:59.000Z

48

222-S Laboratory Quality Assurance Plan. Revision 1  

SciTech Connect

This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

Meznarich, H.K.

1995-07-31T23:59:59.000Z

49

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29,...

50

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Plan Examples Quality Assurance Plan Examples Example 64 8.3 QUALITY ASSURANCE This section describes policies and procedures that will be used to meet QA program objectives. This section also develops the strategies PFP will use to ensure the S&M of the PFP inventory, the material stabilization project, the deactivation project, and the dismantlement of the PFP Complex buildings and are completed in a high quality manner. 8.3.1 QA Program The QA program for the PFP Stabilization and Deactivation Project is implemented in accordance with the requirements of 10 CFR 830.120, Quality Assurance Requirements, (QA Rule) and HNF-PRO-260, Quality Assurance Program . The manner in which the requirements are implemented is specified in QA program plans and implementing procedures for the PFP Complex. The QA

51

Facility Software Quality Assurance for Capital Project Decisions RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Software Quality Assurance (SQA) for Facility Software Quality Assurance (SQA) for Capital Project Critical Decisions Review Module March 2010 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Facility Software Quality Assurance (SQA) for Capital Project Critical Decisions Review Module Critical Decision (CD) Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Post Operation March 2010 Standard Review Plan, 2 nd Edition, March 2010 FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1,

52

The ARRA EAP Energy Assurance Planning Bulletin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JULY 9, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 3 JULY 9, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 3 Need to Know DOE/OE National Energy Assurance Conference Action Items Final Energy Assurance Plans and Reporting Deadlines News from the States California Approves Energy Efficiency Standards Energy Assurance Success Stories Heber Light & Power Takes Lead on Local EA Planning Upcoming Events NASEO/NARUC Environmental Protection & Clean, Reliable Energy Conference "Camp NARUC" GFIRST 2012 Conference Energy Utility Basics Course Guidance from PTI Know the Primary Contacts and Related Partners Alice Lippert, EAP Program Manager Alice.Lippert@hq.doe.gov DOE/OE Website http://www.oe.energy.gov Welcome to the eleventh issue of the quarterly Energy Assurance Planning Bulletin, a service

53

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

54

Facility Software Quality Assurance (SQA) for Captal Project...  

Office of Environmental Management (EM)

Facility Software Quality Assurance (SQA) for Captal Project Critical Decisions RM Facility Software Quality Assurance (SQA) for Captal Project Critical Decisions RM The purpose of...

55

Project Management Quality Assurance Guide, GPG 017  

Energy.gov (U.S. Department of Energy (DOE))

LIFE CYCLE ASSET MANAGEMENT Good Practice Guide GPG-FM-017 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management

56

Emergency Readiness Assurance Plans (ERAPs)  

Directives, Delegations, and Requirements

This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

57

Plutonium Immobilization Project, Project Office Quality Assurance Program Description Revision 1  

SciTech Connect

''The quality assurance activity involves the establishment and implementation of the Quality Assurance Program and the development of a Quality Assurance Plan and Procedures. Quality Assurance provides the plans, procedures and controls that are required for repository acceptance and the immobilization plant licensing and design activities.'' The Plutonium Immobilization Project (PIP) has a policy that all development, testing and operational activities be planned and performed in accordance with its customer's needs and expectations, and with a commitment to excellence and continuous improvement. The Immobilization Development and Testing (D&T) Quality Assurance Program establishes implementation requirements which, when completed, will ensure that the program development and test activities conform to the appropriate QA requirements. In order for the program to be effective, a designated quality lead must be in place at the Project Office and each participating site.

Kan, T.

1998-04-30T23:59:59.000Z

58

The ARRA EAP Energy Assurance Planning Bulletin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 1 3, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 1 Need to Know DOE/OE National-Level Energy Assurance Conference Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Texas Home Weatherization Program is a Success Energy Assurance Success Stories Western Regional Energy Assurance Exercise Recap Other Useful Information and Links Introduction to Energy Infrastructure Interdependencies Cyber Security Concerns for LEAP Planning Upcoming Events NARUC National Electricity Forum NASEO Energy Policy & Technology Outlook Conference Guidance from PTI Know the Local Government Energy Profile Alice Lippert, EAP Program Manager Alice.Lippert@hq.doe.gov OE Website

59

Transuranic Waste Characterization Quality Assurance Program Plan  

SciTech Connect

This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

NONE

1995-04-30T23:59:59.000Z

60

October 2012 Energy Assurance Planning Bulletin Volume 3 No 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 1, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 4 OCTOBER 1, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 4 Need to Know Program Recap Action Items Quarterly and Project Close- Out Reports Due Energy Assurance Success Stories Portland, Oregon's Community-Wide Approach to Local Government Energy Assurance Planning News from the States North Carolina reaps benefits from SLEAP Upcoming Events GridWeek 2012 DOE Winter Fuels Outlook Conference ASERTTI Fall Meeting NMU "The Basics" Courses World Energy Engineering Conference NARUC Annual Meeting Clean Energy Workforce Education Conference NASEO State Energy Policy and Technology Outlook Conference Globalcon 2013 Other Useful Information and Links Next Steps with Energy Assurance Planning -

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

April 2012 ARRA Energy Assurance Planning Bulletin Available | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARRA Energy Assurance Planning Bulletin Available ARRA Energy Assurance Planning Bulletin Available April 2012 ARRA Energy Assurance Planning Bulletin Available April 2, 2012 - 2:15pm Addthis The Department released the April 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the tenth issue of the EAP Bulletin; previous issues are available for download. Addthis Related Articles January 2012 ARRA Energy Assurance Planning Bulletin Available July 2012 ARRA Energy Assurance Planning Bulletin Available April 2012 ARRA Energy Assurance Planning Bulletin Available LM's New Role for the DOE Title X Reimbursement Program

62

The ARRA EAP Energy Assurance Planning Bulletin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 2 2, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 2 Need to Know DOE/OE National Energy Assurance Conference Action Items DOE Requests Sharing of State EA Plans Exercise and Reporting Deadlines Energy Assurance Success Stories West Virginia News from the States California is Top Renewable State Upcoming Events NMU "The Basics" Courses Smart Grid Customer Education Symposium National Town Meeting on Demand Response and Smart Grid Other Useful Information and Links PTI releases new documents Energy Emergency Assurance Coordinator (EEAC) Training Guidance for Use of Unallocated Grant Funds Alice Lippert, EAP Program Manager Alice.Lippert@hq.doe.gov OE Website http://www.oe.energy.gov

63

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The American Recovery and Reinvestment Act (ARRA) Energy Assurance The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 1. January 2012 Energy Assurance Planning Bulletin Volume 3 No 1.pdf More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

64

CRAD, Federal Assurance Capability Plan - February 11, 2009 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Assurance Capability Plan - February 11, 2009 Federal Assurance Capability Plan - February 11, 2009 CRAD, Federal Assurance Capability Plan - February 11, 2009 February 11, 2009 Federal Assurance Capability Plan Inspection Criteria and Approach, DNFSB 2004-1, Commitment 16 (HSS CRAD 64-40, Rev. 0) Federal Assurance Capability Review Plan provides a plan, including criteria, approaches, and the lines of inquiry, to be used for assessing the effectiveness of areas relating to the establishment of a robust Federal assurance capability. The review plan covers all areas in Section 5.1 of the DOE Implementation Plan (IP) except for Section 5.1.3, Instituting a Nuclear Safety Research Function. CRAD, Federal Assurance Capability Plan - February 11, 2009 More Documents & Publications CRAD, Operating Experience - February 11, 2009

65

Report: Acquisition, Project Management, and Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acquisition, Project Management, and Quality Assurance Acquisition, Project Management, and Quality Assurance September 30, 2009 Submitted by the EMAB Acquisition and Project Management Subcommittee Background For FY 2009 EMAB was tasked to review the management and delivery of EM's Construction Projects and confirm whether or not the program is headed in the right direction or needs to make some adjustments in order to improve efficiency. EMAB reviewed and discussed the topics of Acquisition and Project Management during its public meetings. The Acquisition and Project Management subcommittee, comprised of Mr. G. Brian Estes, Dr. Lawrence Papay, and Mr. David Swindle, engaged in teleconferences on August 7 and September 4 with EM senior personnel. Findings and Observations Deputy Assistant Secretary Jack Surash provided an update on EM acquisition initiatives, and he

66

QA program plan plutonium stabilization and handling project W-460  

SciTech Connect

This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

SCHULTZ, J.W.

1999-09-02T23:59:59.000Z

67

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 2012, Volume 3 No. 4 October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 4. October 2012 Energy Assurance Planning Bulletin Volume 3 No 4 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

68

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 2012, Volume 3 No. 1 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 1. January 2012 Energy Assurance Planning Bulletin Volume 3 No 1.pdf More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

69

January 2012 ARRA Energy Assurance Planning Bulletin Available | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2012 ARRA Energy Assurance Planning Bulletin Available January 2012 ARRA Energy Assurance Planning Bulletin Available January 2012 ARRA Energy Assurance Planning Bulletin Available January 3, 2012 - 12:00pm Addthis The Department released the January 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the ninth issue of the EAP Bulletin; previous issues are available for download. Addthis Related Articles April 2012 ARRA Energy Assurance Planning Bulletin Available July 2012 ARRA Energy Assurance Planning Bulletin Available LaDoris (Dot) Harris is the Director of the Office of Economic Impact and Diversity. Women @ Energy: Dot Harris

70

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2, 2012, Volume 3 No. 2 April 2, 2012, Volume 3 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 2, 2012, Volume 3 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 2. April 2012 Energy Assurance Planning Bulletin Volume 3 No 2.pdf More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

71

S-PRIME Thermionic Space Nuclear Power System Quality Assurance Program Plan  

SciTech Connect

This Quality Assurance Program Plan (QAPP)describes how the Thermionic Space Nuclear Power System Design and Technology Demonstration Project addresses the Quality Assurance requirements delineated in DOE Order 5700.6C and the Thermionic Program Management Plan 214PMP000001. The Quality Assurance Program is based on the following fundamental principles, which Rocketdyne endorses and the QA Project Manager and Program Manager shall enforce: Quality Achievement is a continuing responsibility of line organization at all levels; the Quality Assurance organization through the effective overview of work, gives additional assurance that specified requirements are met; risk is the fundamental consideration in determining to what extent the Quality Assurance Plan should be applied to items and processes; action is based on facts and analysis, customer driven quality, strong quality leadership and continuous improvement.

Jones, C.M.

1992-09-23T23:59:59.000Z

72

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The American Recovery and Reinvestment Act (ARRA) Energy Assurance The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 2. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3

73

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

74

October 2011 Energy Assurance Planning Bulletin Volume 2 No 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 4 3, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 4 Need to Know Fourth DOE/OE Regional Tabletop Exercise Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Revolving Loan Funded Hydro Projects Help to Power Nevada Energy Assurance Success Stories Midwest Regional Exercise Recap Other Useful Information and Links New PTI Resources DOE/OE Year-in-Review: 2010 Report Upcoming Events Winter Fuels Outlook NARUC Annual Meeting Guidance from PTI Understand Response Roles and Responsibilities Alice Lippert, EAP Program Manager Alice.Lippert@hq.doe.gov OE Website http://www.oe.energy.gov Welcome to the eighth issue of the quarterly Energy Assurance Planning Bulletin, a

75

Recovery Act: Local Energy Assurance Planning Initiatives | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Local Energy Local Energy Assurance Planning Initiatives Recovery Act: Local Energy Assurance Planning Initiatives View Local Energy Assurance Planning Recipients by City Read more View Local Energy Assurance Planning Recipients - City Populations Read more View the full list of Local Energy Assurance Planning Recipients Energy Secretary Steven Chu announced on February 19, 2010 that the Department of Energy was making selection of awards for more than $8 million to 43 cities and towns across the country to develop or expand local energy assurance plans that will improve electricity reliability and energy security in these communities. These emergency preparedness plans, funded under the American Recovery and Reinvestment Act, will help ensure local governments can recover and restore power quickly following any

76

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 3 2011, Volume 2 No. 1 January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 2, NUMBER 1. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4

77

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, Volume 1 No. 2 0, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 2. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3

78

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 2010, Volume 1 No. 3 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 3. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4

79

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1 2010, Volume 1, No. 4 October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 4. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1

80

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, Volume 2 No. 2 1, Volume 2 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 2, NUMBER 2. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2 More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

2012 National Energy Assurance Planning Conference After-Action Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assurance Planning Conference After-Action Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the Department of Energy, in coordination with the National Association of State Energy Officials (NASEO), held the National Energy Assurance Planning Conference. The conference culminated three years of DOE's ongoing American Recovery and Reinvestment Act of 2009 (ARRA) State and Local Energy Assurance Program (SLEAP). SLEAP seeks to develop new-or refine existing-energy assurance and emergency preparedness plans, which contribute to the resiliency of the energy sector by focusing on the entire energy supply system. The conference served as an important venue for State and local energy

82

July 2012 ARRA Energy Assurance Planning Bulletin Available  

Energy.gov (U.S. Department of Energy (DOE))

The Department released the July 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the eleventh issue of the EAP Bulletin; previous issues are available for download.

83

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, Comprehensive Emergency Management System. The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

84

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

GREAGER, T.M.

1999-12-14T23:59:59.000Z

85

CRAD, Quality Assurance - Idaho Accelerated Retrieval Project Phase II |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRAD, Quality Assurance - Idaho Accelerated Retrieval Project Phase CRAD, Quality Assurance - Idaho Accelerated Retrieval Project Phase II CRAD, Quality Assurance - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Quality Assurance - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Radiological Controls - Idaho Accelerated Retrieval Project Phase II

86

State and Local Energy Assurance Planning  

Energy.gov (U.S. Department of Energy (DOE))

OE works closely with State and local governments on energy assurance issues. The office develops products and tools to inform and educate State and local officials to support their energy emergency response activities

87

Software Quality Assurance Improvment Plan: ALOHA Gap Analysis, Final Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final-ALOHA Final-ALOHA Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: ALOHA Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 ALOHA Gap Analysis May 2004 Final Report INTENTIONALLY BLANK ii ALOHA Gap Analysis May 2004 Final Report FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the chemical source term and atmospheric dispersion computer code, ALOHA 5.2.3, relative to established

88

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

89

Operating and Assurance Program Plan. Revision 4  

SciTech Connect

The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

Not Available

1994-07-01T23:59:59.000Z

90

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

91

Recovery Act: Local Energy Assurance Planning Initiatives  

Energy.gov (U.S. Department of Energy (DOE))

These emergency preparedness plans, funded under the American Recovery and Reinvestment Act, will help ensure local governments can recover and restore power quickly following any energy supply disruptions.

92

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

93

Software Quality Assurance Improvment Plan: CFAST Gap Analysis, Final Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EH-4.2.1.3-CFAST-Gap Analysis EH-4.2.1.3-CFAST-Gap Analysis Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: CFAST Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 CFAST Gap Analysis May 2004 Final Report ii INTENTIONALLY BLANK CFAST Gap Analysis May 2004 Final Report iii FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the CFAST computer code for accident analysis applications, relative to established requirements. This evaluation, a "gap analysis," is performed to meet commitment 4.2.1.3 of the Department of Energy's

94

Identification and characterization of conservative organic tracers for use as hydrologic tracers for the Yucca Mountain site characterization project: Quality Assurance Project Plan, Revision 1; Quarterly progress report, October 1, 1993--December 31, 1993  

SciTech Connect

The purpose of this work is to identify and characterize candidate conservative organic tracers for use as hydrologic tracers for experiments to be conducted at the Yucca Mountain C-well complex. During this quarter the main effort was directed towards rewriting the quality assurance program in preparation for a review and audit by the USGS. However, due to budget constraints the review and audit were not carried out. The tracer QA plan and standard operating procedures (SOPs) were revised and copies are included in the report. Instrumental problems were encountered and corrected with the addition of new integration and sample control software. In the sampling, there was an unexplained peak in the chromatograms of the tracers being tested in the light tuff. This was not correctable and these experiments will be repeated in the next quarter.

Stetzenbach, K.J.

1993-12-13T23:59:59.000Z

95

DAF Glovebox Project Plan  

SciTech Connect

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

96

DNFSB 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.2: Safety Quality Assurance Plan and Criteria for the Safety Analysis Toolbox Codes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-Criteria 2-Criteria Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.2: Software Quality Assurance Plan and Criteria for the Safety Analysis Toolbox Codes U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 November 2003 Software Quality Assurance Criteria for Safety Analysis Codes November 2003 INTENTIONALLY BLANK ii Software Quality Assurance Criteria for Safety Analysis Codes November 2003 FOREWORD This document discusses the Software Quality Assurance plan, and criteria and implementation procedures to be used to evaluate designated, safety-related computer software for the

97

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 9, 2012, Volume 3 No. 3  

Energy.gov (U.S. Department of Energy (DOE))

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

98

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4  

Energy.gov (U.S. Department of Energy (DOE))

The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

99

Designing and Implementing Effective Performance Assurance Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 Ed Anderson, PE CEM FPL Federal Sales Manager  Part of the NextEra Energy family  NextEra Energy Resources  FPL Energy Solutions  GEXA  FPL (Utility)  3rd largest investor-owned utility  Typically #1 or 2 in Energy Efficiency (DSM programs)  Lowest Electric Rates in the State (25% lower than National Average)  In 2010, commissioned Nation's largest PV plant and the first solar preheat fossil plant.  Completed 50 UESC projects since 1995  First Basic Ordering Agreement (BOA) in the Nation  Seven different agencies ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Based on demonstrating the performance of the installed equipment and systems. The Statement of Work includes equipment and system performance metrics and measuring

100

The Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFC Focused on Hanfords 300 Area Uranium Plume Quality Assurance Project Plan  

SciTech Connect

The purpose of the project is to conduct research at an Integrated Field-Scale Research Challenge Site in the Hanford Site 300 Area, CERCLA OU 300-FF-5 (Figure 1), to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The project will investigate a series of science questions posed for research related to the effect of spatial heterogeneities, the importance of scale, coupled interactions between biogeochemical, hydrologic, and mass transfer processes, and measurements/approaches needed to characterize a mass-transfer dominated system. The research will be conducted by evaluating three (3) different hypotheses focused on multi-scale mass transfer processes in the vadose zone and groundwater, their influence on field-scale U(VI) biogeochemistry and transport, and their implications to natural systems and remediation. The project also includes goals to 1) provide relevant materials and field experimental opportunities for other ERSD researchers and 2) generate a lasting, accessible, and high-quality field experimental database that can be used by the scientific community for testing and validation of new conceptual and numerical models of subsurface reactive transport.

Fix, N. J.

2008-01-31T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CRAD, Quality Assurance- Idaho Accelerated Retrieval Project Phase II  

Energy.gov (U.S. Department of Energy (DOE))

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho Accelerated Retrieval Project Phase II.

102

Quality assurance management plan (QAPP) special analytical support (SAS)  

SciTech Connect

It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

LOCKREM, L.L.

1999-05-20T23:59:59.000Z

103

Project Management Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

104

Tank waste remediation system privatization phase I infrastructure and project W-519 and QA implementation plan  

SciTech Connect

This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001.

HUSTON, J.J.

1999-08-19T23:59:59.000Z

105

Now Available: July 2011 issue of the Energy Assurance Planning Bulletin  

Energy.gov (U.S. Department of Energy (DOE))

This quarter's issue of the Energy Assurance Planning Bulletin highlights upcoming DOE/OE Regional Exercises, Recipient Action Items, and success stories.

106

Project Hanford management contract quality improvement project management plan  

SciTech Connect

On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

ADAMS, D.E.

1999-03-25T23:59:59.000Z

107

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

108

Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological  

E-Print Network (OSTI)

.....................................................................................................................................................1 Transition to Electronic Data ManagementQuality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey

109

PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plan Examples Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Sect. 6.e.7.a Sect. 4.1.1 Step 1 1. Example 1

110

Quality assurance (QA) plan for the transportation and receipt of transuranic (TRU) waste  

SciTech Connect

The Department of Energy (DOE) Albuquerque Operations (AL) Office of Projects and Energy Programs has been assigned the responsibility for administration of the disposal of Contact-Handled (CH) Transuranic (TRU) contaminated material (waste) from generator/storage sites of the United States defense programs that are operated by the DOE. This responsibility encompasses all activities associated with the certification of TRU waste and the transportation, receipt and disposal of that waste at the Waste Isolation Pilot Plant (WIPP). The WIPP is located near Carlsbad, New Mexico and is being developed under the management of the DOE WIPP Project Office (WPO). The DOE/WPO is a branch of the DOE/AL and has been delegated overall responsibility for all aspects of the WIPP program. This report describes the quality assurance plan for the TRU waste transportation and receipt of waste.

Not Available

1990-02-01T23:59:59.000Z

111

DIGITAL ARCHITECTURE PROJECT PLAN  

SciTech Connect

The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

Ken Thomas

2014-09-01T23:59:59.000Z

112

PROJECT MANAGEMENT PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

113

Project Surveillance and Maintenance Plan. [UMTRA Project  

SciTech Connect

The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

Not Available

1985-09-01T23:59:59.000Z

114

PROJECT MANGEMENT PLAN EXAMPLES Prepare and Issue Project Plan Documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Issue Project Plan Documents and Issue Project Plan Documents Example Example 70 5.2 Information and Reporting Management reporting provides timely and accurate data to apprise BWHC, FDH, and DOE management of current and projected project conditions. Information contained in these reports is obtained from the same database that supports day-to-day management by BWHC. 5.2.1 Project Status Report Reporting for the 324/327 Buildings Stabilization/Deactivation Project is incorporated in the monthly PSR, prepared by BWHC for FDH and RL. The PSR summarizes performance and compares it with the technical, schedule, and cost baselines contained in the MYWP. The report provides the data required by the DOE-HQ process. 5.2.2 Project Manager's Monthly Report

115

Plutonium immobilization project development and testing quality assurance program description - February 1999  

SciTech Connect

Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work.

MacLean, L M; Ziemba, J

1999-02-01T23:59:59.000Z

116

2012 National Energy Assurance Planning Conference After-Action Report (August 2012)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 National Energy Assurance Planning Conference 2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability National Association of State Energy Officials ii | P a g e Table of Contents I. Purpose & Objectives ............................................................................................................ 1 II. Participants ............................................................................................................................ 1 III. Conference Summary ............................................................................................................ 1

117

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Communication and Stakeholder Involvement Communication and Stakeholder Involvement Plan Examples Example 49 10.0 COMMUNICATIONS AND PUBLIC INVOLVEMENT The transition of B Plant is a critical element in Hanford's mission of environmental management. The B Plant Transition Project Management Team have made a commitment to open communications throughout transition because effective communications and public involvement are critical success factors for the project. Communications must be living and dynamic, responding to accomplishments and emerging issues or activities. A communications plan will be developed to define specific actions for disseminating information regarding project objectives, strategies, problems/issues, and status, and for developing strategies for soliciting input/involvement throughout the deactivation

118

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Integration - Safety Integration - Implementation of Controls Examples Example 24 5 Health & Safety This section describes the work controls associated with the 771/774 Closure Project. As prescribed in DOE Order 440.1, Worker Protection Management for DOE Federal and Contractor Employees, the project must comply with the OSHA construction standards for Hazardous Waste Operations and Emergency Response, 29 CFR 1910.120 and 1926. Under these standards, a Building 771/774 Closure Project-Specific HASP has been prepared to address the safety and health hazards of each phase of operations. In addition, the DOE Order for Construction Project Safety and Health Management, 5480.9A, applies to this project. This order requires the preparation of JHAs to identify each task, the hazards associated with each task, and the precautions necessary to mitigate the

119

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

120

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

122

PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Project Scope and Plan Project Scope and Objectives Examples Example 6 2.3 MISSION OBJECTIVES Stabilization of plutonium-bearing materials and deactivation/dismantlement of the PFP Complex will result in the virtual elimination of the hazards and risks associated with the facility and will greatly reduce the costs of safe, secure S&M. Using the lessons learned from deactivation projects across the DOE Complex, further improvement on previously applied deactivation methods is anticipated. The major mission objectives for the PFP Stabilization and Deactivation Project are as follows:  Maintain inventory of plutonium-bearing material in safe and highly secure storage pending shipment offsite;  Maintain the PFP facilities, systems, and residual radioactive and chemical contamination in a safe,

123

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

124

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Draft 3 Draft November 19, 2009 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II, V1.3 Publication Date: November 19, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Steven Ducharme, PMC, LLC Lenore Morrison, PMC, LLC Judith Bernsen, PMC, LLC Edited by: Norm Ayers, EES, LLC Reviewed by: Larry Flanigan, Energy Enterprise Solutions, LLC Kai Mong, Energy Enterprise Solutions, LLC Ruth Ann Smith, Energy Enterprise Solutions, LLC Approval: _________________________________ John Makepeace, DOE OECM MA-50

125

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Safety Management Examples Integrated Safety Management Examples Example 10 8.2 PFP INTEGRATED SAFETY STRATEGY The following discussion identifies the process that will be used by the PFP Stabilization and Deactivation Project to ensure that the safety of the worker, public, and the environment are adequately addressed during the project. The primary activities involved in the process include the following:  Implementation of the Integrated Safety Management System (ISMS),  Identification, control, or mitigation of worker safety-related issues for stabilization and deactivation/dismantlement activities,  Facility/chemical vulnerability assessment and management,  Use of the DOE-approved authorization basis and the Unreviewed Safety Question (USQ) process to determine if the PFP

126

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 June 17, 2010 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II, V1.5 Publication Date: June 17, 2010 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Steven Ducharme, PMC, LLC Lenore Morrison, PMC, LLC Judith Bernsen, PMC, LLC Edited by: Dennis Stoner, EES, LLC Reviewed by: Mark Landry, Dekker, LTD Ken Henderson, Energy Enterprise Solutions, LLC Ruth Ann Smith, Energy Enterprise Solutions, LLC Approval: John Makepeace, DOE OECM MA-50, May 25, 2010 iii Change Control Page

127

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

GREAGER, T.M.

2000-12-06T23:59:59.000Z

128

Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project  

SciTech Connect

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

Reidel, Steve P.

2006-05-26T23:59:59.000Z

129

SAPHIRE 8 Software Project Plan  

SciTech Connect

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: Incorporation of SPAR models for the SDP interface. Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. Continue the current activities for code maintenance, documentation, and user support for the code.

Curtis L.Smith; Ted S. Wood

2010-03-01T23:59:59.000Z

130

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f M M a a n n a a g g e e m m e e n n t t D D r r a a f f t t C C o o n n c c e e p p t t o o f f O O p p e e r r a a t t i i o o n n s s f f o o r r P P A A R R S S I I I I Draft Version 1.3 July 28, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net 2 Title Page Document Name: Draft Concept of Operations for PARS II Publication Date: July 28, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07 CLIN 2 Prepared by: Norm Ayers, EES Reviewed by: Kai Mong, EES Reviewed by: Larry Flanigan EES Approval: _________________________________ John Makepeace, DOE OECM MA-50 3 Change Control Page The change control page contains information about revisions to the document and should be

131

Quality Assurance Program Plan for AGR Fuel Development and Qualification Program  

SciTech Connect

Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractors quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

W. Ken Sowder

2004-02-01T23:59:59.000Z

132

PROJECT PLANNING TEMPLATE | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PLANNING TEMPLATE PROJECT PLANNING TEMPLATE More Documents & Publications Proposed Data Elements for PARS II Web Application Slide 1 Critical Decision 2 (CD-2) Approval Template...

133

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metrics Examples Metrics Examples Example 42 5.1.4 Performance Measurement and Reporting The subproject manager will communicate subproject technical issues and accomplishments, schedule performance, cost and schedule issues, and corrective action plans, as appropriate, in the Project Directors' weekly 'Path Forward' meeting. However, the primary performance measurement for reporting subproject performance is provided by the performance measurement system. Within the new common database containing core information on Project Hanford, called HANDI 2000, the performance measurement system compares the resource-loaded schedules (budgeted cost of work scheduled [BCWS]), the actual cost of work

134

Recommendations for a Software Quality Assurance Plan for the CMR Facility at LANL  

SciTech Connect

The Nuclear Materials Technology (NMT) organizations 1 and 3 within the Chemical and Metallurgical Research (CMR) facility at the Los Alamos National Laboratory are working to achieve Waste Isolation Pilot Plant (WIPP) certification to enable them to transport their TRU waste to WIPP. This document is intended to provide not only recommendations to address the necessary software quality assurance activities to enable the NMT-1 and NMT-3 organizations to be WIPP compliant but is also meant to provide a template for the final Software Quality Assurance Plan (SQAP). This document specifically addresses software quality assurance for all software used in support of waste characterization and analysis. Since NMT-1 and NMT-3 currently have several operational software products that are used for waste characterization and analysis, these software quality assurance recommendations apply to the operations, maintenance and retirement of the software and the creation and development of any new software required for waste characterization and analyses.

Adams, K.; Matthews, S. D.; McQueen, M. A.

1998-10-01T23:59:59.000Z

135

Sample Project Execution Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sample Project Execution Plan Sample Project Execution Plan Sample Project Execution Plan The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects. The plan serves as the main communication vehicle to ensure that everyone is aware and knowledgeable of project objectives and how they will be accomplished. The plan is the primary agreement between Headquarters and the federal project director and a preliminary plan should be developed and approved at Critical Decision-1. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. The plan is a living document and should be updated to describe current and future processes and procedures, such as integrating safety

136

Project Execution Plan Electron Beam Ion Source Project  

E-Print Network (OSTI)

Project Execution Plan for the Electron Beam Ion Source Project (EBIS) Project # 07-SC-02 of Nuclear Physics (SC ­ 26) Rev. 1 May 2008 #12;#12;#12;4 Project Execution Plan for the Electron Beam Ion Source Project (EBIS) Change Log Revision No. Pages Affected Effective Date Revision 0 Baseline Document

137

SNF Project Engineering Process Improvement Plan  

SciTech Connect

This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

DESAI, S.P.

2000-02-09T23:59:59.000Z

138

E-Print Network 3.0 - analytical quality assurance Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

for NRDA followed standard operating procedure (SOP), water sampling plans, Summary: procedures, and NOAA's Analytical Quality Assurance Project Plan (QAPP). Samples were sent...

139

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Plan Examples Environmental Plan Examples Example 51 8.1 ENVIRONMENTAL STRATEGY A significant part of the strategy for maintaining compliance with environmental regulatory requirements during the PFP Stabilization and Deactivation Project is to apply the process described in the Tri-Party Agreement, Section 8.0, "Facility Decommissioning Process." The Section 8.0 process will allow the DOE to develop agreements with the State and Federal regulatory agencies facilitating timely stabilization of the PFP inventory of plutonium-bearing materials, deactivation of the PFP Complex, and perhaps elimination of all above ground hazards at the PFP Complex through dismantlement of the buildings and structures. The Section 8.0 process also provides the means for DOE to ensure the public and stakeholders get an opportunity

140

Nuclear Fuel Storage and Transportation Planning Project Overview...  

Office of Environmental Management (EM)

Fuel Storage and Transportation Planning Project Overview Nuclear Fuel Storage and Transportation Planning Project Overview Nuclear Fuel Storage and Transportation Planning Project...

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Planning for Solar Projects on Federal Sites | Department of...  

Office of Environmental Management (EM)

Planning for Solar Projects on Federal Sites Planning for Solar Projects on Federal Sites Photo of a photovoltaic system. Planning for the federal site solar project can begin...

142

Project Execution Plan Review Module (RM)  

Energy.gov (U.S. Department of Energy (DOE))

The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

143

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in...

144

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Control Examples Configuration Control Examples Example 38 7.05 Configuration Management Plan Configuration Management activities for this project will be carried out using a graded approach, consistent with the guidance in Reference #20. The CM Actions listed in Appendix B of Reference #20 will be carried out as follows: Action 1 - Develop System Boundaries This action will not be performed because the intended End State of 322-M is that all systems will be deactivated and all utility services that were connected to the systems in the facility will be disconnected by isolation at the facility boundary. This isolation will be reflected in Action 2. Action 2 - Develop and Update Drawings Revisions will be made only to those essential drawings that show the modifications made to the facility as part of executing the

145

IT Quality Assurance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Quality Assurance IT Quality Assurance Quality, error-free work holds down costs. Avoiding mistakes and rework saves valuable time, effort, and materials. Quality assurance provides the mechanisms for paying close attention to details so that tasks are completed correctly and accurately every step of the way. A quality assurance role should be established for all projects. Software Quality Assurance Plan Example (pdf) An example of a software quality assurance plan developed from an actual DOE project SQA plan based on DOE G 200.1-1A, Software Engineering Methodology. Structured Walkthrough Training and Guidance (pdf) Classroom or individual project team training and materials on how to conduct structured walkthroughs (peer review of products/code). This process guide describes how to conduct a structured walkthrough during the

146

CRAD, Quality Assurance- Oak Ridge National Laboratory TRU ALPHA LLWT Project  

Energy.gov (U.S. Department of Energy (DOE))

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Quality Assurance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

147

Fast flux test facility, transition project plan  

SciTech Connect

The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

Guttenberg, S.

1994-11-15T23:59:59.000Z

148

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Baseline Development and Control Technical Baseline Development and Control Examples Example 40 5.0 PROJECT MANAGEMENT AND CONTROL The Project Management and Control section provides an overview of the project management and control systems that will be used to manage the 324/327 Buildings Stabilization/Deactivation Project, addressing the following key elements of project management and control:  Project Management Control System (PMCS) - Work breakdown structure - Baseline development/update - Scheduling - Performance measurement and reporting - Change control  Information and reporting - Project status report - Project manager's monthly report - FDH/RL project status review - DOE-HQ project management reviews - Special reviews

149

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect

The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

GREAGER, T.M.

1999-09-09T23:59:59.000Z

150

PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Organization Examples Organization Examples Example 8 4.0 PROJECT ORGANIZATION Chapter 4.0 describes the principle project organizations, including their responsibilities and relationships. Other organizations, that have an interest in the project, also are described. 4.1 Principal Project Organizations and Responsibilities The management organization for the 324/327 Buildings Stabilization/Deactivation Project represents a partnership between four principal project organizations responsible for the project. The four project organizations and their associated summary responsibilities are described in the following paragraphs. 4.1.1 U.S. Department of Energy, Headquarters (HQ) The DOE-HQ Office of Nuclear Material and Facility Stabilization (EM-60) is primarily responsible for policy and budget decisions

151

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

2009-09-15T23:59:59.000Z

152

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

CERTA PJ

2008-07-10T23:59:59.000Z

153

EC-Web Project Plan | Department of Energy  

Energy Savers (EERE)

EC-Web Project Plan EC-Web Project Plan The Electronic Commerce World Wide Web (EC-WEB) Project Plan, from an actual DOE software engineering project, can be used as a template to...

154

Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAR 2 4 201011 MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be integrated and engaged at various project lifecycle phases. These disciplines include project management, engineering, design, safety, environment, safeguards and security, and quality assurance. The lessons-learned to date from ongoing Headquarters (HQ) and Field project reviews [e.g., Construction Project

155

SAPHIRE 8 Software Quality Assurance Oversight  

SciTech Connect

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, 'New Features and Capabilities Overview'.

Kurt G. Vedros

2011-09-01T23:59:59.000Z

156

Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program  

SciTech Connect

The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

Carlsbad Field Office

2002-03-01T23:59:59.000Z

157

Getting projects in gear  

Science Journals Connector (OSTI)

......week for most projects - to review progress against the plan. Use a standard agenda. Document and agree...achievements. Ensure that review and quality assurance processes...of the high level project plan. Make sure that the project......

John Lawlor

2001-11-01T23:59:59.000Z

158

Yucca Mountain Site Characterization Project Plan  

SciTech Connect

The purpose of this document is to describe the Yucca Mountain Site Characterization Project (YMP) and establish an approved YMP baseline against which overall YMP progress and management effectiveness shall be measured. For the sake of brevity, this document will be referred to as the Project Plan throughout this document. This Project Plan only addresses activities up to the submittal of the repository license application (LA) to the Nuclear Regulatory Commission (NRC). A new Project Plan will be submitted to establish the technical, cost, and schedule baselines for the final design and construction phase of development extending through the start of repository operations, assuming that the site is determined to be suitable.

Gertz, C.P.; Bartlett, J.

1992-01-01T23:59:59.000Z

159

PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Example Project Execution Example Example 73 6.3 Project Approach The overall schedule strategy for the PFP project includes ongoing minimum safe activities, combined with stabilization of materials followed by materials disposition, and subsequent transition of the PFP complex to a decommissioned state. The PFP material stabilization baseline was developed using a functionally-based work WBS. The WBS defines all activities required to take each material stream from their current location/conditions through stabilization (as required), and disposition the stabilized material as solid waste for shipment to WIPP or as product material for shipment to SRS. Initially, workshops were held with subject matter experts, project managers, schedulers, and support personnel (experts in the

160

Large hadron collider (LHC) project quality assurance plan  

E-Print Network (OSTI)

management, and conduct of operations into the Berkeleymanagement, and conduct of operations. For involved unitsassurance, safety, and conduct of operations are implemented

Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Risk Assessment Examples Risk Assessment Examples Example 54 10.0 PROJECT RISK This section outlines a methodology which will be used to qualitatively/subjectively assess the project risk. The approach is modeled after project risk assessment processes outlined in standard project management texts and training courses but tailored to the unique risks encountered in the DOE projects. In the context of this section, project risk means risk to one of the project baselines (technical, cost, or schedule) and should not be confused with health and safety risks. However, health and safety issues are considered to the extent that they impact the risk to the project baselines. 10.1 RISK ASSESSMENT TOOLS The two primary tools that will be used to conduct the risk assessment are listed below.

162

Project Plan UC Online Education (UCOE)  

E-Print Network (OSTI)

of Contents I. PROJECT DESCRIPTION II. COST REVENUE MODEL AND FINANCIAL FORECAST III. INCENTIVES1 Project Plan UC Online Education (UCOE) March 24, 2011 Office of the President SUPPORTING CAMPUS AND FACULTY PARTICIPATION IV. RISKS AND RISK MANAGEMENT V. PROJECT ORGANIZATION

Becker, Luann

163

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

SEEMAN, S.E.

2000-04-01T23:59:59.000Z

164

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

165

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Closure Plan Examples System Closure Plan Examples Example 61 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

166

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S&M Plan Examples S&M Plan Examples Example 44 5.0 SURVEILLANCE AND MAINTENANCE 5.01 Current S&M Requirements Currently, the heavy water facility is performing operational maintenance and surveillances as dictated by outside and inside facility operating rounds, facility operating procedures, facility maintenance procedures, facility alarm response procedures, and any additional surveillance and maintenance required by SFSD and SRS administrative programs and policies. As the facility progresses through deactivation, the operational S&M requirements will be retired. 5.02 Post Deactivation S&M Plan (Summary) An S&M plan, required by Ref. 1, will be developed and approved following deactivation of the 400-D excess facilities. Three types of S&M activities are envisioned. On a monthly basis, the outside of the excess facilities will be inspected for safety, security, and

167

SNF project engineering process improvement plan  

SciTech Connect

This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999.

KELMENSON, R.L.

1999-05-24T23:59:59.000Z

168

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

169

Example Measurement & Verification Plan for a Super ESPC Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Example Measurement & Verification Plan for a Super ESPC Project Example Measurement & Verification Plan for a Super ESPC Project Report features a comprehensive measurement and...

170

2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN...

171

Nuclear Fuels Storage and Transportation Planning Project (NFST...  

Office of Environmental Management (EM)

Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Presentation made by...

172

River Protection Project System Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

gallons (Mgal) 1 closure of radioactive waste contained in the Hanford Site waste tanks and 2 This version of the RPP System Plan (Rev. 6) is a major update of the previous...

173

SNF project engineering process improvement plan  

SciTech Connect

This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999.

DESAI, S.P.

1999-07-13T23:59:59.000Z

174

SAMPLING AND ANALYSIS PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

Littleton, CO 80127 #12;CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 SAMPLING Environmental Consultants, Inc. Approved By: Date: Sally Cuffin Project Quality Assurance Manager New Horizons...................................................................................................................................3 2.5 Decision Rules

175

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Management Plan Examples Property Management Plan Examples Example 68 6.03.11 Property Management Facility maintenance and E&I personnel tools located in 717-D will be redeployed in other facilities. Heavy water facility process and support system spare parts located in the 717-D tool crib will be redeployed or returned to Stores. Machines located in the 717-D machine shop are already registered with Property Management and will be left in place. The 501-D diesel generator, spare refrigeration system compressor, and Aeroflow breathing air systems will be registered with Property Management for potential reuse. Other remaining facility equipment will be abandoned in place. Personnel computers will be redeployed and responsibility for office furniture will be turned over to the Subcontract Services Department furniture warehouse for redistribution.

176

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training and Qualification Plan Examples Training and Qualification Plan Examples Example 66 8.2.2 Personnel Training and Qualification The Personnel Training and Qualification program is being established as defined by laws, DOE Orders, and company directives to ensure that personnel are trained and qualified to perform assigned tasks. The training and qualification program develops personnel proficiency commensurate with the scope, complexity, and nature of an assigned activity. Management is responsible for developing staff position requirements based on education and experience necessary to perform tasks. Building managers and suppliers that provide personnel to support building operations are responsible for ensuring that personnel are sufficiently trained to perform assigned tasks in a manner that minimizes risk to personnel performing a task, co-workers, and

177

Quality Assurance Plan for Field Activities at the Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge, Tennessee  

SciTech Connect

The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) has established a Natural and Accelerated Bioremediation Research (NABIR) program Field Research Center (FRC) for the U.S. Department of Energy (DOE) Office of Biological and Environmental Research. The FRC is located in Bear Creek Valley within the Y-12 Plant area of responsibility on DOE's Oak Ridge Reservation in Tennessee. The NABIR program is a long-term effort designed to increase the understanding of fundamental biogeochemical processes that would allow the use of bioremediation approaches for cleaning up DOE's contaminated legacy waste sites. The FRC provides a site for investigators in the NABIR program to conduct research and obtain samples related to in situ bioremediation. The FRC is integrated with existing and future laboratory and field research and provides a means of examining the biogeochemical processes that influence bioremediation under controlled small-scale field conditions. This Quality Assurance Plan (QAP) documents the quality assurance protocols for field and laboratory activities performed by the FRC staff. It supplements the requirements in the ORNL Nuclear Quality Assurance Program and the ESD Quality Assurance Program. The QAP addresses the requirements in Title 10 CFR, Part 830 Subpart A, ''Quality Assurance Requirements'', using a graded approach appropriate for Research and Development projects based on guidance from ''Implementation Guide for Quality Assurance Programs for Basic and Applied Research'' (DOE-ER-STD-6001-92). It also supports the NABIR FRC Management Plan (Watson and Quarles 2000a) which outlines the overall procedures, roles and responsibilities for conducting research at the FRC. The QAP summarizes the organization, work activities, and qualify assurance and quality control protocols that will be used to generate scientifically defensible data at the FRC. The QAP pertains to field measurements and sample collection conducted by the FRC to characterize the site and in support of NABIR-funded investigations at the FRC. NABIR investigators who collect their own samples or measurements at the FRC will be responsible for developing their own data quality assurance protocol. Notably, this QAP will be of direct benefit to NABIR investigators who will be provided with and use the documented quality data about the FRC to support their investigations.

Brandt, C.C.

2002-02-28T23:59:59.000Z

178

Quality assurance of HDR prostate plans: Program implementation at a community hospital  

SciTech Connect

Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

Rush, Jennifer B. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States); Thomas, Michael D. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States)]. E-mail: mthomas@hprhs.com

2005-01-01T23:59:59.000Z

179

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiological Controls/ALARA Examples Radiological Controls/ALARA Examples Example 57 8.4 RADIOLOGICAL CONTROL This section describes policies and procedures that will be used to meet radiological control program objectives. It also describes the key actions PFP will take to ensure the PFP Stabilization and Deactivation Project activities are completed safely, and that radioactive materials at the PFP are managed in a controlled and safe manner. 8.4.1 Radiological Control Program The Radiological Control program for the PFP Stabilization and Deactivation Project will be implemented in accordance with the requirements of 10 CFR 835, Occupational Radiation Protection, and HSRCM-1, Hanford Site Radiological Control Manual . Implementing procedures are administrated as Hanford Procedures in accordance with the implementation strategy outlined in HNF-

180

Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.  

SciTech Connect

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

Brouns, Thomas M.

2007-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

182

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Management Examples Work Management Examples Example 36 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical standards, instructions, procedures, and other control documentation commensurate with the complexity and risk posed by the task. The calibration program governs the process that ensures quality of the calibration and maintenance of process monitoring equipment. Equipment found to be out of calibration is tagged and not used until re-calibrated. HNF-PRO that implement DOE-Order 5480.19, and HNF-PRO-233, -298, and others determined applicable, will be evaluated and necessary facility specific procedures developed to complement them for implementation. 10.2 Personnel Safety

183

2012 Annual Planning Summary for West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project 2012 Annual Planning Summary for West Valley Demonstration Project The ongoing and projected Environmental Assessments and Environmental Impact...

184

Federal Energy Management Program: Renewable Energy Project Planning and  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

185

step toward the project's planned early 2011 startup. The project  

NLE Websites -- All DOE Office Websites (Extended Search)

step toward the project's planned early 2011 startup. The project step toward the project's planned early 2011 startup. The project will capture CO 2 from the Archer Daniels Midland (ADM) Ethanol Production Facility and inject it into a deep saline reservoir more than one mile underground. Beginning in early 2011, up to 1 million metric tons of the captured CO 2 will be compressed into a dense, liquid-like state and injected over a three-year period. The Mt. Simon Sandstone, which is the rock formation targeted for the injection, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity as high as 110 billion metric tons. Analysis of the survey data is a key component in the comprehensive monitoring program that will be implemented to ensure the injected

186

Energy Strategic Planning & Sufficiency Project  

SciTech Connect

This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

Retziaff, Greg

2005-03-30T23:59:59.000Z

187

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

188

National Ignition Facility project acquisition plan  

SciTech Connect

The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

Callaghan, R.W.

1996-04-01T23:59:59.000Z

189

Quality Assurance of Radiation Therapy Planning Systems: Current Status and Remaining Challenges  

SciTech Connect

Computerized radiation therapy planning systems (RTPSs) are pivotal for treatment planning. The acceptance, commissioning, and quality control of RTPSs are uniquely complex and are described in the American Association of Physicists in Medicine Task Group Report 53 (1998) and International Atomic Energy Agency Technical Report Series No. 430 (2004). The International Atomic Energy Agency also developed a document and data package for use by vendors and purchasers to aid with acceptance testing of RTPSs. This document is based on International Electrotechnical Commission standard 62083 (2000) and describes both 'type' tests to be performed in the factory and 'site' tests to be performed in the clinic. The American Association of Physicists Task Group Report 67 described benchmark tests for the validation of dose calculation algorithms. Test data are being produced with the backing of the U.S. National Cancer Institute. However, significant challenges remain. Technology keeps evolving rapidly, thus requiring new quality assurance (QA) procedures. Intensity-modulated radiation therapy with its use of inverse optimization has added a new dimension to QA, because the results are not intuitively obvious. New technologies such as real-time ultrasound guidance for brachytherapy, TomoTherapy, and Cyberknife, require their own specialized RTPSs with unique QA requirements. On-line imaging allows for the generation of dose reconstructions using image warping techniques to determine the daily dose delivered to the patient. With increasing computer speeds, real-time reoptimization of treatment plans will become a reality. Gating technologies will require four-dimensional dose calculations to determine the actual dose delivered to tissue voxels. With these rapidly changing technologies, it is essential that a strong QA culture is invoked in every institution implementing these procedures and that new protocols are developed as a part of the clinical implementation process.

Van Dyk, Jacob [Department of Physics and Engineering, London Regional Cancer Program/London Health Sciences Centre, London, ON (Canada); Departments of Oncology, Medical Biophysics, Diagnostic Imaging and Nuclear Medicine, and Physics and Astronomy, University of Western Ontario, London, ON (Canada)], E-mail: jake.vandyk@lhsc.on.ca

2008-05-01T23:59:59.000Z

190

EV Community Readiness projects: Delaware Valley Regional Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware Valley Regional Planning Commission (PA); Metropolitan Energy Information Center, Inc. (KS, MO) EV Community Readiness projects: Delaware Valley Regional Planning...

191

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network (OSTI)

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate planning objectives of the campus are appropriately coordinated and facilitate the successful

California at Santa Barbara, University of

192

Business System Planning Project, Preliminary System Design  

SciTech Connect

CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

EVOSEVICH, S.

2000-10-30T23:59:59.000Z

193

Department of Energy Guide for Project Execution Plans - DOE...  

NLE Websites -- All DOE Office Websites (Extended Search)

5, Department of Energy Guide for Project Execution Plans by John Makepeace Functional areas: Program Management, Project Management This directive provides guidance for the...

194

Used Fuel Disposition Campaign Preliminary Quality Assurance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to...

195

Project management plan for Project W-320, Tank 241-C-106 sluicing  

SciTech Connect

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

Phillips, D.R.

1994-12-01T23:59:59.000Z

196

Department of Energy Guide for Project Execution Plans  

Directives, Delegations, and Requirements

This directive provides guidance for the federal project director to produce a useful and flexible plan. No cancellation.

2008-09-12T23:59:59.000Z

197

Data Collection, Quality Assurance, and Analysis Plan for the 2008/2009 Hydrogen and Fuel Cells Knowledge and Opinions Survey  

NLE Websites -- All DOE Office Websites (Extended Search)

13 13 DATA COLLECTION, QUALITY ASSURANCE, AND ANALYSIS PLAN FOR THE 2008/2009 HYDROGEN AND FUEL CELLS KNOWLEDGE AND OPINIONS SURVEYS R. L. Schmoyer Tykey Truett Susan Diegel September 2008 Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6073 Managed by UT-BATTELLE, LLC For the U.S. DEPARTMENT OF ENERGY Under contract No. DE-AC05-00OR22725 Prepared for the Hydrogen Program Office of Energy Efficiency and Renewable Energy U.S. DEPARTMENT OF ENERGY Washington, D.C. Analysis Plan: Hydrogen Surveys i 9/29/2008 TABLE OF CONTENTS ACRONYMS ................................................................................................................ii ABSTRACT ................................................................................................................

198

Analysis of offsite emergency planning zones project  

SciTech Connect

The Rocky Flats Plant maintains and uses significant nonradioactive chemically hazardous material (HAZMAT) inventories. Some of these materials are used in sufficient quantities to represent a credible risk to the offsite public in the event of an emergency at the facility. In Phase 2 of this project, the EG G Rocky Flats, Inc. and TENERA, L.P. Task Team (Task Team) produced an initial screening-level modeling analysis study and an Emergency Planning Zone (EPZ) encompassing the Vulnerable Zones (VZs) for hazardous materials stored at the facility. The screening-level analysis will be supplemented with more refined evaluations during subsequent phases of the project. The existence of these chemicals in the Rocky Flats Plant Occupational Health Information System (OHIS) chemical inventory database was verified. All liquid and gaseous chemicals were considered as potential hazardous material source terms for further screening analysis. Hazards associated with solid substances were not considered in this phase of the project. 2 figs., 13 tabs.

Petrocchi, A.J.; Armstrong, C.E. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); McKinney, J.M.; Verholek, M.G.; Fraser, P.J.; Dalfonso, P.H. (TENERA, L.P., Knoxville, TN (United States))

1991-07-18T23:59:59.000Z

199

Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE))

QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY DOE has established Quality Policy, Principles and Value Added Requirement Attributes that apply to all work and are focused on performance, customer expectations, and improvement. When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer unlimited implementation flexibility.

200

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Quality Assurance Program  

Energy.gov (U.S. Department of Energy (DOE))

Formal EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 1) to ensure all EM projects utilize a consistent quality assurance approach.

202

Sustainable Energy Action Plans: Project Management Intercomparison  

Science Journals Connector (OSTI)

Abstract This paper explores the content of various Sustainable Energy Action Plans (SEAPs) necessary to the Covenant of Mayors. This study has the aim of providing an overview of existing methodologies for the development and implementation of \\{SEAPs\\} by municipalities. As the number and complexity of issues related with energy are very broad, it is very important to know and identify good practices and guidelines to increasing participant municipalities. Based on the methodologies collected in several studies, it is possible to identify key aspects and issues municipalities might consider for the development of their own plan. The SEAP cant be only a collection of measures; it must have a coherent strategy with the European and National policies. This study also shows that a good coordinator with project management skills is necessary to overcome obstacles due to the lack of communication or collaboration among the different municipality's departments.

Eurico Vasco Amorim

2014-01-01T23:59:59.000Z

203

A process for establishing a financial assurance plan for LLW disposal facilities  

SciTech Connect

This document describes a process by which an effective financial assurance program can be developed for new low-level radioactive waste (LLW) disposal facilities. The report identifies examples of activities that might cause financial losses and the types of losses they might create, discusses mechanisms that could be used to quantify and ensure against the various types of potential losses identified and describes a decision process to formulate a financial assurance program that takes into account the characteristics of both the potential losses and available mechanisms. A sample application of the concepts described in the report is provided.

Smith, P. [EG and G Idaho, Inc., Idaho Falls, ID (United States). National Low-Level Waste Management Program

1993-04-01T23:59:59.000Z

204

Business Continuity Project Project Summary: Develop Business Continuity Plans for all critical functional areas of  

E-Print Network (OSTI)

Business Continuity Project Project Summary: Develop Business Continuity Plans for all critical functional areas of the corporation. Project Requirements: Individual and Corporate plans that allow organization- · Integrate stand-by generator into plans- · Improve evacuation procedures- · Integrate other

205

PROJECT INITIATION FORM FACILITY SERVICES PLANNING, DESIGN AND CONSTRUCTION  

E-Print Network (OSTI)

PROJECT INITIATION FORM FACILITY SERVICES ­ PLANNING, DESIGN AND CONSTRUCTION 202 Facility Services would like an appointment to discuss the project. Department: College: Requestor's Name: E-mail : Phone: Project Contact: (if other than requestor): E-mail : Phone: B. PROJECT INFORMATION Project Location

Stephens, Jacqueline

206

Project X Accelerator R&D Plan  

SciTech Connect

Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem performance requirements, associated accelerator and technology issues, and the plans for add

Not Available

2008-01-31T23:59:59.000Z

207

Renewable Energy Project Planning and Implementation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Planning and Implementation Renewable Energy Project Planning and Implementation October 7, 2013 - 9:31am Addthis Federal renewable energy projects can be large or small and managed by a third-party or the agency. Typically, large-scale projects-larger than 10 megawatts (MWs)-are financed, planned, and implemented by the private sector. Distributed-scale projects (smaller than 10 MWs) are funded and managed by either the agency through agency appropriations or a renewable energy developer through a project funding mechanism. The complexity of large-scale projects means there are separate processes for smaller and larger projects. Learn about: Large-scale renewable energy projects (larger than 10 MWs) Distributed-scale renewable energy projects (smaller than 10 MWs)

208

Reviewing Measurement and Verification Plans for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE))

Document provides a framework for implementing uniform and consistent reviews of measurement and verification (M&V) plans for Federal energy savings performance contract (ESPC) projects.

209

Fast Flux Test Facility project plan. Revision 2  

SciTech Connect

The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

Hulvey, R.K.

1995-11-01T23:59:59.000Z

210

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

211

Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan  

SciTech Connect

This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

Parazin, R.J.

1998-08-28T23:59:59.000Z

212

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program  

SciTech Connect

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energys (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 Quality Assurance Program under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as not applicable to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

2008-03-07T23:59:59.000Z

213

Quality Assurance Exchange August 2007, Volume 3 Issue 2 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2007, Volume 3 Issue 2 August 2007, Volume 3 Issue 2 Quality Assurance Exchange August 2007, Volume 3 Issue 2 Quality Assurance Exchange August 2007, Volume 3 Issue 2 U.S. Department of Energy Office of Corporate Safety Analysis EM INITIATES QA EVALUATION PLAN In response to Secretary Bodman's memorandum "Improving Quality Assurance" (April 2006), and in an effort to improve quality assurance issues within line item construction and operational projects, the Office of Environmental Management (EM) has developed a QA Initiative Evaluation Plan. Quality Assurance Exchange August 2007, Volume 3 Issue 2 More Documents & Publications QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3 DOE G 414.1-4, Safety Software Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance

214

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network (OSTI)

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised September. INTRODUCTION · An effective major capital planning and review process will: · Encourage appropriate provided to CPC- January · Review of 2-3 Alternative Plans prepared in consultation with CCP- February

California at Santa Barbara, University of

215

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network (OSTI)

Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

Princeton Plasma Physics Laboratory

216

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Construction Quality Assurance Plan Construction Quality Assurance Plan This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page H-1 Construction Quality Assurance Plan 1.1 Introduction This Construction Quality Assurance Plan supports the implementation of remedial activities at LEHR covered by the Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent with and supplements the requirements of the Quality Assurance Project Plan and quality assurance elements covered in Section 7 of the Remedial Design/Remedial Action Work Plan. 1.2 Distribution This plan shall be distributed with the Remedial Design/Remedial Action Work Plan to all

217

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project  

SciTech Connect

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

David Duncan

2011-05-01T23:59:59.000Z

218

Quality Assurance for Critical Decision Reviews RM | Department...  

Office of Environmental Management (EM)

Quality Assurance for Critical Decision Reviews RM Quality Assurance for Critical Decision Reviews RM The purpose of this Quality Assurance for Capital Project Critical Decision...

219

Why does project planning fail; A look at the basics of planning in an era of sophisticated project control tools  

SciTech Connect

The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's.

Foley, M. (Liberty Consulting Group, Atlanta, GA (US)); Luciano, G. (Cleveland Electric Illuminating Co., OH (United States))

1991-01-01T23:59:59.000Z

220

Quality Assurance for Critical Decision Reviews RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance for Quality Assurance for Critical Decision Reviews Module March 2010 CD-0 O 0 OFFICE OF Q C CD-1 F ENVIRO Standard R Quality A Rev Critical Decis CD-2 M ONMENTAL Review Plan Assuranc view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) e (QA) e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Project Management Plan Examples 1 - 80 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

222

Technology Transfer Expansion Planned UTCA is conducting a major project  

E-Print Network (OSTI)

Technology Transfer Expansion Planned UTCA is conducting a major project to evaluate and extend its technology transfer activities (UTCA project 03217). Steven Jones and David Eckhoff of UAB are working to expand the current technology transfer program to showcase the successes of the UTCA projects. Samples

Carver, Jeffrey C.

223

Detailed Execution Planning for Large Oil and Gas Construction Projects  

E-Print Network (OSTI)

Detailed Execution Planning for Large Oil and Gas Construction Projects Presented by James Lozon, University of Calgary There is currently 55.8 billion dollars worth of large oil and gas construction projects scheduled or underway in the province of Alberta. Recently, large capital oil and gas projects

Calgary, University of

224

Administration for Native Americans Project Planning and Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration for Native Americans Project Planning and Administration for Native Americans Project Planning and Development Training Administration for Native Americans Project Planning and Development Training November 4, 2013 8:00AM PST to November 6, 2013 5:00PM PST Las Vegas, Nevada Have you ever wondered what the secret is to preparing for an Administration for Native Americans (ANA) grant application? The ANA Western Region Training and Technical Assistance Center is hosting a project planning and development training to provide information about the critical, time-consuming work that comes before writing an ANA grant application. Learn how to use the development process to prepare projects for a variety of public or private funders, including the ANA. The goal of the training is to provide you with tools to better define problems faced by your

225

FEMP Offers Training on Distributed-Scale Renewable Energy Projects: From Planning to Project Closeout  

Energy.gov (U.S. Department of Energy (DOE))

The course focuses on the planning and implementation of distributed-scale renewable energy projects, which are smaller than 10 megawatts. It outlines a detailed 10-step process from technology screening to project closeout.

226

Reviewing Measurement and Verification Plans for Federal ESPC Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewing Measurement & Verification Plans Reviewing Measurement & Verification Plans for Federal ESPC Projects February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at www.eere.energy.gov/femp/financing/ . [Headers and footers only revised 12/08] Reviewing M&V Plans Contents REVIEWING MEASUREMENT AND VERIFICATION PLANS FOR FEDERAL ESPC PROJECTS ............................................................................................................ 1 STEP 1 - PREPARE CUSTOM REPORT AND CHECKLIST FROM TEMPLATE .......................... 1

227

Finance and supply management project execution plan  

SciTech Connect

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

228

Quality Assurance Checklist | Department of Energy  

Energy Savers (EERE)

Quality Assurance Checklist Quality Assurance Checklist This checklist is intended to provide system owners, project managers and other information systems development and...

229

UK RE Planning Database Project: October, 2010 | OpenEI  

Open Energy Info (EERE)

RE Planning Database Project: October, 2010 RE Planning Database Project: October, 2010 Dataset Summary Description The Planning Database Project provides the UK Department of Energy and Climate Change (DECC) with regular data to track progress towards achieving EU targets for electricity generation from renewable energy (RE) sources. Extracts from the database are available each month. Information collected in the database includes: name, location and installed capacity of RE projects over 0.1MW; environmental designations; planning status; and construction status. Included here is the October 2010 Progress Datasheet, and an extract from December, 15, 2010 (i.e. a single snapshot in time). More up to date data can be retrieved from: https://restats.decc.gov.uk/app/reporting/decc/monthlyextract.

230

Project No. MGL1106 Page 1 Science Support Plan  

E-Print Network (OSTI)

Project No. MGL1106 Page 1 Science Support Plan R/V Marcus G. Langseth Crisp 3D Seismic April 10th ............................................................................................................................................8 3.2. SHIPPING, FISHING AND DIVING ACTIVITY ......................................................................................................................................12 6.3. SEISMIC PARAMETERS

231

Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant (PFP)  

SciTech Connect

This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP.

COX, G.J.

1999-10-25T23:59:59.000Z

232

HTI retrieval demonstration project execution plan  

SciTech Connect

This plan describes the process for demonstrating the retrieval of difficult Hanford tank waste forms utilizing commercial technologies and the private sector to conduct the operations. The demonstration is to be conducted in Tank 241-C-106.

Ellingson, D.R.

1997-09-04T23:59:59.000Z

233

Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan  

SciTech Connect

This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

Carlson, Thomas J.; Johnson, Gary E.

2010-01-29T23:59:59.000Z

234

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network (OSTI)

Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

Princeton Plasma Physics Laboratory

235

Reactor Safety Planning for Prometheus Project, for Naval Reactors Information  

SciTech Connect

The purpose of this letter is to submit to Naval Reactors the initial plan for the Prometheus project Reactor Safety work. The Prometheus project is currently developing plans for cold physics experiments and reactor prototype tests. These tests and facilities may require safety analysis and siting support. In addition to the ground facilities, the flight reactor units will require unique analyses to evaluate the risk to the public from normal operations and credible accident conditions. This letter outlines major safety documents that will be submitted with estimated deliverable dates. Included in this planning is the reactor servicing documentation and shipping analysis that will be submitted to Naval Reactors.

P. Delmolino

2005-05-06T23:59:59.000Z

236

Risk Management Plan Electron Beam Ion Source Project  

E-Print Network (OSTI)

, with the appropriate management oversight, can establish the specific approaches to addressing the individual riskRisk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office

237

Tank waste information network system II (TWINS2) year 2000 compliance assurance plan  

SciTech Connect

The scope of this plan includes the Tank Waste Information Network System II (TWINS2) that contains the following major components: Tank Characterization Database (TCD), Tank Vapor Database (TVD), Data Source Access (DSA), automated Tank Characterization Report, Best-Basis Inventory Model (BBIM), and Tracker (corrective action tracking) function. The automated Tank Characterization Report application currently in development also will reside on-the TWINS system as will the BBIM. Critical inputs to TWINS occur from the following databases: Labcore and SACS. Output does not occur from TWINS to these two databases.

Adams, M.R.

1998-04-16T23:59:59.000Z

238

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR PORTS-2012-09-24 HIAR PORTS-2012-09-24 Site: Portsmouth Gaseous Diffusion Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System (CAS) Program Dates of Activity : 09/24/12 - 10/04/12 Report Preparer: Joseph P. Drago Activity Description/Purpose: The Office of Health, Safety and Security (HSS) shadowed PPPO's review of specific elements of the Fluor-B&W Portsmouth (FBP) CAS program at the Portsmouth Gaseous Diffusion Plant (PORTS). The review was limited to three requirements of Department of Energy (DOE) Order 226.1B, Implementation of Department of Energy Oversight Policy:

239

Siberian Chemical Combine laboratory project work plan, fiscal year 1999  

SciTech Connect

The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

Morgado, R.E.; Acobyan, R.; Shropsire, R.

1998-12-31T23:59:59.000Z

240

Uranium mill tailings remedial action project real estate management plan  

SciTech Connect

This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

Not Available

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Software Verification and Validation Plan Activities, 2011 -- SAPHIRE 8 Quality Assurance  

SciTech Connect

SV&V Updates through FY11 An official update was released in February 2011. This update was to add a new automated test, to revise the SV&V wording to indicate the operational life cycle that SAPHIRE 8 has entered, and to provide design documentation for Inspection Planning Reports (which evolved into the Plant Risk Information e-Book (PRIB)) and Analysis Speed Improvements. Another update to the SV&V will be released in conjunction with this report in September 2011 to include the following: two new automated tests, the inclusion of metrics into the testing regime and references to the addition of the Preliminary Design Review and Critical Design Review processes.

Kurt G. Vedros; Curtis L. Smith

2011-09-01T23:59:59.000Z

242

Quality Assurance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assurance Assurance Quality Assurance QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY DOE has established Quality Policy, Principles and Value Added Requirement Attributes that apply to all work and are focused on performance, customer expectations, and improvement. When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer unlimited implementation flexibility. The DOE quality management system moves beyond the traditional quality assurance requirements that had become narrowly focused on safety systems, paper, compliance, and inspections. The management system is designed to link with an organization's strategic plan to support mission achievement and the

243

Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans  

Energy.gov (U.S. Department of Energy (DOE))

Review protocol and lines of inquiry that are used as basis for technical review and approval of site-specific quality assurance programs.

244

Single-shell tank interim stabilization project plan  

SciTech Connect

Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. The plan is based on realistic assumptions and addresses three separate funding scenarios.

Ross, W.E.

1998-03-27T23:59:59.000Z

245

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program  

Energy.gov (U.S. Department of Energy (DOE))

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

246

Spent Nuclear Fuel (SNF) Project Execution Plan  

SciTech Connect

The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

LEROY, P.G.

2000-11-03T23:59:59.000Z

247

ENTO 489 Field Entomology Field Project Plan  

E-Print Network (OSTI)

.com Wildlife and Fisheries Science Wildlife and Fisheries Science Class of 2006 Class of 2005 Project, and weekends when needed. · We will not collect on days if the cloud cover is more than 80% and/or if the wind

Behmer, Spencer T.

248

CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of...

249

Best-in-Class Project Management Initiative Corporate Implementation Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best-in-Class Project Management Initiative Best-in-Class Project Management Initiative Corporate Implementation Plan Final Prepared for: U.S. Department of Energy Prepared by: U.S. Army Corps of Engineers, Huntington District and Project Time & Cost, Inc. 2727 Paces Ferry Road, Suite 1-1200 Atlanta, Georgia 30339 March 14, 2008 TOC - 1 Table of Contents Executive Summary ............................................................................................................. i 1.0 Introduction................................................................................................................ 1 1.1 Vision for Best-in-Class Project Management Initiative ........................................ 1 1.2 Strategy for Achieving BICPM ..............................................................................

250

Planned Publications Resulting from CARINA Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Resulted from CARINA Project Resulted from CARINA Project Earth System Science Data (ESSD) Journal submitted CARINA publications (Special Issue). Falck, E. and Olsen, A.: Nordic Seas dissolved oxygen data in CARINA, Earth Syst. Sci. Data, 2, 123-131, doi:10.5194/essd-2-123-2010, 2010 Hoppema, M., Velo, A., van Heuven, S., Tanhua, T., Key, R. M., Lin, X., Bakker, D. C. E., Perez, F. F., Ríos, A. F., Lo Monaco, C., Sabine, C. L., Álvarez, M., and Bellerby, R. G. J.: Consistency of cruise data of the CARINA database in the Atlantic sector of the Southern Ocean, Earth Syst. Sci. Data, 1, 63-75, doi:10.5194/essd-1-63-2009, 2009. Jeansson, E., Olsson, K. A., Tanhua, T., and Bullister, J. L.: Nordic Seas and Arctic Ocean CFC data in CARINA, Earth Syst. Sci. Data, 2, 79-97, doi:10.5194/essd-2-79-2010, 2010.

251

New Mexico Students Plan Solar Energy Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Students Plan Solar Energy Project Students Plan Solar Energy Project New Mexico Students Plan Solar Energy Project July 14, 2010 - 5:07pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? New Mexico received $4.5 million through State Energy Program Recovery Act Grant Los Lunas High School received $300,000 to build solar energy system Renewable energy to save school $20,000 a year Engineering students at Los Lunas High School in New Mexico put their knowledge to work by scoping out the optimal site for a new solar energy system that's expected to save the school district more than $20,000 a year. In September 2009, the school district learned of a grant opportunity through the State Energy Program with funds from the American Recovery and Reinvestment Act to install a photovoltaic system. By October, students,

252

Nuclear Fuels Storage & Transportation Planning Project Documents |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Cycle Technologies » Nuclear Fuels Storage & Fuel Cycle Technologies » Nuclear Fuels Storage & Transportation Planning Project » Nuclear Fuels Storage & Transportation Planning Project Documents Nuclear Fuels Storage & Transportation Planning Project Documents September 30, 2013 Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites In January 2013, the Department of Energy issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste. Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. February 22, 2013 Public Preferences Related to Consent-Based Siting of Radioactive Waste Management Facilities for Storage and Disposal This report provides findings from a set of social science studies

253

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2009-12-01T23:59:59.000Z

254

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton

2009-10-01T23:59:59.000Z

255

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2010-03-01T23:59:59.000Z

256

West Virginia Smart Grid Implementation Plan (WV SGIP) Project  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia Smart Grid Implementation Plan (WV SGIP) Project West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Assessment of As-Is Grid by Non-Utility Stakeholders Introduction One goal of this grid modernization project is to assess the current status of the electric power grid in West Virginia in order to define the potential to implement smart grid technologies. Thus, an initial task of this project was to define the current state or "As-Is" grid in West Virginia. Financial and time constraints prohibited the development and execution of formal surveys to solicit input from the various stakeholders. However attempts were made to obtain their input through informal questionnaires and meeting with focus groups. list of stakeholders which

257

Sandia National Laboratories: Energy Assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Assurance Mesa del Sol Project Is Finalist for International Smart Grid Action Network 2014 Award of Excellence On July 31, 2014, in Distribution Grid Integration, Energy,...

258

PROJECT MANGEMENT PLAN EXAMPLES Project Closeout - Final Report Example  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Report Example Final Report Example Example 79 4.6.2.2.4.2 Closeout Reports Completion documentation will be compiled for each of the identified worksets. A final Closeout Report will be prepared for the 771/774 Closure Project when work is completed and the analytical data has been received. The report will consist of a brief description of the work that was completed, including any modifications or variations from the original decision document. The report will also include analytical results, including the results of any confirmatory sampling taken to verify completion of the action to the specific performance standards. A discussion of the quantity and characteristics of the actual wastes produced and how the wastes were stored or disposed will also be provided.

259

Energy Strategic Planning & Self-Sufficiency Project  

SciTech Connect

This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follow: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

Greg Retzlaff

2005-03-30T23:59:59.000Z

260

TECHNOLOGY DEVELOPMENT PROJECT PLAN Advanced Technology Large Aperture Space Telescope  

E-Print Network (OSTI)

(ATLAST) A Roadmap for UVIOR Technology, 2010-2020 24 April, 2009 T. Tupper Hyde, ATLAST TechnologistTECHNOLOGY DEVELOPMENT PROJECT PLAN for the Advanced Technology Large Aperture Space Telescope, and Ronald Polidan. #12;Advanced Technology Large-Aperture Space Telescope (ATLAST) 22 TABLE OF CONTENTS 1

Sirianni, Marco

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Project Management Plan Examples 1 - 80 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Examples 1 - 80 Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

262

Yakima Habitat Improvement Project Master Plan, Technical Report 2003.  

SciTech Connect

The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan outlines a four-year schedule for acquisition, protection, and restoration of the 25 highest ranked prop

Golder Associates, Inc.

2003-04-22T23:59:59.000Z

263

IT Project Management | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Management IT Project Management Qualification, Engineering and Quality Assurance The purpose of the Department of Energy (DOE) IT Project Management, Engineering, and Quality Assurance effort is to lead and provide guidance to information technology programs, and to support the successful development and maintenance of Departmental site-specific information systems. This is accomplished by fostering and mentoring continuous growth and maturity in the use of best practices for project management, software systems engineering, and quality assurance and soliciting DOE-wide participation and successes for sharing. IT Project Management, Engineering, and Quality Assurance is a component of the DOE Enterprise Architecture Program and Capital Planning and Investment

264

FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2  

SciTech Connect

Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

Not Available

1991-02-01T23:59:59.000Z

265

Intermediate evaluation of USAID/Cairo energy policy planning project  

SciTech Connect

Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

1992-01-01T23:59:59.000Z

266

Intermediate evaluation of USAID/Cairo energy policy planning project  

SciTech Connect

Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

1992-09-01T23:59:59.000Z

267

Nuclear Fuels Storage & Transportation Planning Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Fuels Storage & Nuclear Fuels Storage & Transportation Planning Project Nuclear Fuels Storage & Transportation Planning Project Independent Spent Fuel Storage Installation (ISFSI) at the shutdown Connecticut Yankee site. The ISFSI includes 40 multi-purpose canisters, within vertical concrete storage casks, containing 1019 used nuclear fuel assemblies [412.3 metric ton heavy metal (MTHM)] and 3 canisters of greater-than-class-C (GTCC) low-level radioactive waste. Photo courtesy of Connecticut Yankee (http://www.connyankee.com/html/fuel_storage.html). Independent Spent Fuel Storage Installation (ISFSI) at the shutdown Connecticut Yankee site. The ISFSI includes 40 multi-purpose canisters, within vertical concrete storage casks, containing 1019 used nuclear fuel

268

Example Measurement & Verification Plan for a Super ESPC Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6.1 6.1 Example M&V Plan Example Measurement & Verification Plan for a Super ESPC Project February 2007 Federal Energy Management Program (FEMP) Office of Energy Efficiency and Renewable Energy U.S. Department of Energy This document was developed for the U.S. Department of Energy's Federal Energy Management Program by Nexant, Inc., and Lawrence Berkeley National Laboratory. This document is posted on FEMP's web site at www.eere.energy.gov/femp/financing/superespcs_mvresources.cfm. Comments should be sent to lwebster@nexant.com. 6.1 Example M&V Plan Contents 1. EXECUTIVE SUMMARY / M&V OVERVIEW AND PROPOSED SAVINGS CALCULATIONS ................................................................................................... 2 1.1

269

Standard Review Plan (SRP) Modules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance » Standard Quality Assurance » Standard Review Plan (SRP) Modules Standard Review Plan (SRP) Modules Standard Review Plan - Critical Decision Handbook Overview Project Management Project Execution Plan Review Module (RM) Risk Management RM Integrated Project Team RM Earned Value Management System RM Acquisition Strategy RM Decommissioning Plan RM Site Transition Guidance Engineering and Design Conceptual Design RM Preliminary Design RM Final Design RM Construction Readiness RM Checkout, Testing, and Commissioning Plan RM Readiness Review RM Seismic Design Expectations Report Technology Readiness Assessment Report External Technical Review Report Preparation for Facility Operations RM Safety Safety Design Strategy RM Conceptual Safety Design RM Preliminary Safety Design RM Facility Disposition Safety Strategy RM

270

Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program  

SciTech Connect

This Software Quality Assurance Plan (SQAP) applies to the development and maintenance of GoldSim models supporting the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) performance assessments (PAs) and composite analyses (CAs). Two PA models have been approved by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as of November 2006 for the PA maintenance work undertaken by National Security Technologies, LLC (NSTec). NNSA/NSO asked NSTec to assume the custodianship of the models for future development and maintenance. The models were initially developed by Neptune and Company (N&C).

Gregory J. Shott, Vefa Yucel

2007-01-03T23:59:59.000Z

271

The Quad E project - planning and engineering issues  

SciTech Connect

The Eastern European Electricity Exports (Quad-E) project proposes to generate power at a selected site in Eastern Europe or the NIS (New Independent States) to supply in-country electric demand and to provide for power export to a Western European country. It is envisioned that power will be generated using Clean Coal Technology at a repowered or greenfield site. This paper describes general planning and engineering issues that need to be considered in the process of selection of a suitable combination of power exporter and power purchaser considering the uncertainties and variables that have to be taken into account. Planning issues include: (1) location of the generating site in the Eastern European Integrated Power System; (2) location of the buyer in the Integrated Power System of Western Europe; (3) transmission options and access issues; (4) grid interconnection plans in the region; (5) power supply/demand projections for the producing country; and (6) power supply (and other energy supply) alternatives available to the buyer. Engineering issues include: (1) fuel resources in the power producing country; (2) available generating plants suitable for repowering; (3) candidate repowering technologies; alternative greenfield plant options; (4) Clean Coal technologies suited to the local resources; (5) typical cost of power at the production site; (6) typical wheeling charges; and typical cost of power delivered to user. The Quad E Project is presently under study by EIT and Burns and Roe.

Guerra, C.R. [Burns and Roe Co., Oradell, NJ (United States); Marcum, J.M. [European Institute of Technology, Florence (Italy)

1993-12-31T23:59:59.000Z

272

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

273

Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project  

SciTech Connect

This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

SINCLAIR, J.C.

1999-05-03T23:59:59.000Z

274

Princeton's Office of Gift Planning can help you explore ways to make a bequest that will assure your own legacy on campus. Making a gift from your estate begins with the  

E-Print Network (OSTI)

Princeton's Office of Gift Planning can help you explore ways to make a bequest that will assure and estate-related expenses are paid, to Princeton. · A testamentary trust can be helpful for you and your at Princeton. Gift Planning staff members, working with the Office of General Counsel, will help ensure

275

Next Generation CANDU Performance Assurance  

SciTech Connect

AECL is developing a next generation CANDU design to meet market requirements for low cost, reliable energy supplies. The primary product development objective is to achieve a capital cost substantially lower than the current nuclear plant costs, such that the next generation plant will be competitive with alternative options for large-scale base-load electricity supply. However, other customer requirements, including safety, low-operating costs and reliable performance, are being addressed as equally important design requirements. The main focus of this paper is to address the development directions that will provide performance assurance. The next generation CANDU is an evolutionary extension of the proven CANDU 6 design. There are eight CANDU 6 units in operation in four countries around the world and further three units are under construction. These units provide a sound basis for projecting highly reliable performance for the next generation CANDU. In addition, the next generation CANDU program includes development and qualification activities that will address the new features and design extensions in the advanced plant. To limit product development risk and to enhance performance assurance, the next generation CANDU design features and performance parameters have been carefully reviewed during the concept development phase and have been deliberately selected so as to be well founded on the existing CANDU knowledge base. Planned research and development activities are required only to provide confirmation of the projected performance within a modest extension of the established database. Necessary qualification tests will be carried out within the time frame of the development program, to establish a proven design prior to the start of a construction project. This development support work coupled with ongoing AECL programs to support and enhance the performance and reliability of the existing CANDU plants will provide sound assurance that the next generation CANDU plants will meet customer expectations. (authors)

Wren, David J.; Allsop, P.J.; Hopwood, J.M. [Atomic Energy of Canada Ltd., Ontario (Canada)

2002-07-01T23:59:59.000Z

276

Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

NONE

1998-03-01T23:59:59.000Z

277

Integrated development and testing plan for the plutonium immobilization project  

SciTech Connect

This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium-containing ceramic forms within large canisters of high level waste (HLW) glass. Deployment of the immobilization capability should occur by 2006 and be completed within 10 years.

Kan, T.

1998-07-01T23:59:59.000Z

278

Corporate Sustainability Reporting: Investigation of Assurance Process, Assurance Characteristics and Assurance Frameworks Used  

E-Print Network (OSTI)

-Chairperson: Theodore J. Mock ________________________________ Prakash P. Shenoy ________________________________ Catherine Schwoerer ________________________________ Todd Little Date Defended: August 20, 2012 ii....5.1 Introduction to Part I: Planning Assurance Services for Sustainability Reporting: An Analysis of Cost versus Assurance in Audit Evidence ......................................................... 20 1.5.2 Introduction to Part II: The Development of Worldwide...

Rao, Sunita

2012-08-31T23:59:59.000Z

279

PUREX/UO{sub 3} deactivation project management plan  

SciTech Connect

From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

Washenfelder, D.J.

1993-12-01T23:59:59.000Z

280

Annual Planning Summaries: Advanced Research and Projects Agency (ARPA-E) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research and Projects Agency Research and Projects Agency (ARPA-E) Annual Planning Summaries: Advanced Research and Projects Agency (ARPA-E) Document(s) Available For Download February 2, 2012 2012 Annual Planning Summary for Advanced Research Projects Agency-Energy The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Advanced Research Projects Agency-Energy. January 26, 2011 2011 Annual Planning Summary for Advanced Research and Projects Agency (ARPA-E) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Advanced Research and Projects Agency (ARPA-E). February 1, 2010 2010 Annual Planning Summary for Advanced Research Projects Agency-Energy (ARPA-E) Annual Planning Summaries briefly describe the status of ongoing NEPA

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Investigation of Project Management Planning Practices for Renovation of Historical Buildings in Urban Contexts Located in Texas  

E-Print Network (OSTI)

This study investigated the relationship between Project Management Planning (PMP) practices and project success for preservation projects of historical significance located in an urban context. The planning for these projects was also emphasized...

Escamilla, Edelmiro

2012-07-16T23:59:59.000Z

282

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 1 Socio-economic benefits in Plan Vivo projects  

E-Print Network (OSTI)

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 1 Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda Sarah Carter 2009 #12;Socio-economic Kairu, Bbale Marcellinus, Willie McGhee, Alexa Morrison and Pauline Nantongo. #12;Socio-economic

283

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

284

Life Cycle Asset Management - Quality Assurance -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Quality Assurance March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management Contents GPG-FM-017 March 1996 iii ACKNOWLEDGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2. PRINCIPLES AND PROCESSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Goals, Principles and Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.1 Quality Assurance Goals and Principles . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1.2 Quality Assurance Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.2 Quality Assurance and Project Phases . . . . .

285

Quality Assurance  

Directives, Delegations, and Requirements

To establish an effective management system [i.e., quality assurance programs (QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Cancels DOE O 414.1.

1999-09-29T23:59:59.000Z

286

Quality Assurance  

Directives, Delegations, and Requirements

The Order defines roles and responsibilities for providing quality assurance for DOE products and services. Cancels DOE O 414.1C. Admin Chg 1, dated 5-8-13, cancels DOE O 414.1D.

2011-04-25T23:59:59.000Z

287

A study of preproject planning and project success using \\{ANNs\\} and regression models  

Science Journals Connector (OSTI)

It has long been recognized by the industry practitioners that how well preproject planning is conducted has a great impact on project outcome. Through industry project data collection and model analysis, this research intends to investigate the relationship between preproject planning and project success. Preproject planning and project performance information from 62 industrial projects and 78 building projects, representing approximately $5billion U.S.D. in total construction cost, is collected and used for this research analysis. Based on the information obtained, preproject planning is identified as having direct impact on the project success (cost and schedule performance). Two techniques were then used to develop models for predicting cost and schedule performance: statistical regression analysis, and artificial neural networks (ANNs). The research results provide a valuable source of information that supports better planning in the early stage of the project life cycle and have positive impact on the final project outcome.

Yu-Ren Wang; G. Edward Gibson Jr.

2010-01-01T23:59:59.000Z

288

RELAP5/MOD3 code quality assurance plan for ORNL ANS narrow channel flow and heat transfer correlations  

SciTech Connect

Modifications have been made to REIAP5 to account for flow and heat transfer in narrow channels between fuel plates such as found in the cores of the Advanced Neutron Source (ANS) and High Flux Isotope Reactor (HFIR) reactors. These early models were supplied by Art Ruggles of Oak Ridge National Laboratory (ORNL) and Don Fletcher of the Idaho National Engineering Laboratory (INEL) and were adapted to and implemented into RELAP5 by Rich Riemke, Rex Shumway and Ken Katsma. The purpose of this report is to document the current status of these special models in the standard version of RELAP5/MOD3 and describe the quality assurance procedures.

MIller, C.S.; Shumway, R.W.

1992-11-01T23:59:59.000Z

289

Quality Assurance Specialist  

Energy.gov (U.S. Department of Energy (DOE))

Alternate Title(s):Quality Control Technician; Quality Assurance Inspector; Quality Assurance Representative

290

Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project  

SciTech Connect

Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently.

Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

2000-10-18T23:59:59.000Z

291

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

292

Secretary Chu Announces Over $8 Million to Support Local Energy Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Over $8 Million to Support Local Energy Over $8 Million to Support Local Energy Assurance Planning Initiatives Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives, Recovery Act Funding to Help Communities Prepare for Energy Emergencies and Disruptions Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives More Documents & Publications Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

293

Environmental permits and approvals plan for high-level waste interim storage, Project W-464  

SciTech Connect

This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

Deffenbaugh, M.L.

1998-05-28T23:59:59.000Z

294

Office of Quality Assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Assurance Quality Assurance QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY DOE has established Quality Policy, Principles and Value Added Requirement Attributes that apply to all work and are focused on performance, customer expectations, and improvement. When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer unlimited implementation flexibility. The DOE quality management system moves beyond the traditional quality assurance requirements that had become narrowly focused on safety systems, paper, compliance, and inspections. The management system is designed to link with an organization's strategic plan to support mission achievement and the delivery of products and services. The Department's commitment to environment, safety, and health also relies, upon work being conducted within an effective management system. DOE line managers and contracting officers must understand these two fundamental purposes for the QA requirements and ensure the QA Order and rule are specified in each major contract (including those contracts using the Work Smart Standards process to satisfy DOE Acquisition regulation 48 CFR 970.5223-1).

295

PROJECT MANGEMENT PLAN EXAMPLES Policy & Operational Decisions, Assumptions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy & Operational Decisions, Assumptions Policy & Operational Decisions, Assumptions and Strategies Examples 1 & 2 Example 1 1.0 Summary The 322-M Metallurgical Laboratory is currently categorized as a Radiological Facility. It is inactive with no future DOE mission. In May of 1998 it was ranked Number 45 in the Inactive Facilities Risk Ranking database which the Facilities Decommissioning Division maintains. A short-term surveillance and maintenance program is in-place while the facility awaits final deactivation. Completion of the end points described in this deactivation project plan will place the 322-M facility into an End State that can be described as "cold and dark". The facility will be made passively safe requiring minimal surveillance and no scheduled maintenance.

296

West Virginia Smart Grid Implementation Plan (WV SGIP) Project  

NLE Websites -- All DOE Office Websites (Extended Search)

WV DoE-NRCCE-APERC DRAFT February 16, 2009 WV DoE-NRCCE-APERC DRAFT February 16, 2009 1 West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Customer Complaints to WV PSC about Electric Power Service Ali Feliachi, Muhammad Choudhry, John Saymansky and Ed Sneckenberger February 16, 2009 Introduction APERC has appreciated that one of the most important sources for data on the consumer perspective of the current electric power grid in West Virginia would be the WV Public Service Commission (WV PSC). Thus, an email request was sent on December 19, 2008 to Byron Harris at the WV PSC to request any advice or approaches to determine customer and regulatory perspectives of the current electric power grid in WV. Customer Complaint Data Bryon Harris was able to provide a spreadsheet of customer complaints in West Virginia for

297

Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan  

SciTech Connect

Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

Justin Coleman

2014-09-01T23:59:59.000Z

298

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Energy.gov (U.S. Department of Energy (DOE))

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

299

FY 2015 OFFICE OF BUDGET & FINANCE STRATEGIC PLAN Strategic Plan Items & Projects  

E-Print Network (OSTI)

Reports Uniform Guidance Review Spreadsheet Journal process improvements Three New Quality Assurance Balance Reporting Combination Editing Rule Review Budget Deficit Summer Workshop 3.3.1.3. Payroll Work

O'Toole, Alice J.

300

Project plan, Hazardous Materials Management and Emergency Response Training Center: Project 95L-EWT-100  

SciTech Connect

The Hazardous Materials Management and Emergency Response (HAMMER) Training Center will provide for classroom lectures and hands-on practical training in realistic situations for workers and emergency responders who are tasked with handling and cleanup of toxic substances. The primary objective of the HAMMER project is to provide hands-on training and classroom facilities for hazardous material workers and emergency responders. This project will also contribute towards complying with the planning and training provisions of recent legislation. In March 1989 Title 29 Code of Federal Regulations Occupational Safety and Health Administration 1910 Rules and National Fire Protection Association Standard 472 defined professional requirements for responders to hazardous materials incidents. Two general types of training are addressed for hazardous materials: training for hazardous waste site workers and managers, and training for emergency response organizations.

Borgeson, M.E.

1994-11-09T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Safety Planning Guidance Hydrogen and Fuel Cell Projects  

E-Print Network (OSTI)

Risk Reduction Plan Appendix I ­ Acceptable ISV Methods............................................................................ 10 Appendix II ­ Risk Binning Matrix

302

2014 Annual Planning Summary for the West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the West Valley Demonstration Project.

303

Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314  

SciTech Connect

The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

304

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect

The Configuration Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable configuration management practices described in HNF-0842, Volume 111, Section 3.1, ''Configuration Management Implementation''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

305

Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect

The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

306

Analysis of offsite Emergency Planning Zones for Rocky Flats Plant  

SciTech Connect

The purpose of this quality assurance program was to ensure the quality and technical adequacy of Phase 2 of the Analysis of Offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant project. Quality assurance was accomplished by managing and controlling the processes in the development of the product. The quality assurance task team conducted audits, reviews, and surveillances of project and related activities. This process contributed to identifying areas where the quality assurance plan was not fully implemented, areas needing improvement, and/or corrective actions resulting in a improved product. During the reviews and audits, several key areas were identified where quality assurance plan implementation needed to be improved. These areas included maintaining adequate documentation, reviewing technical results, making inputs traceable to technical results, and understanding that all personnel are responsible for quality.

Inger, J.R. (TENERA, L.P., Knoxville, TN (United States)); Brown-Strattan, M.A. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant)

1991-01-01T23:59:59.000Z

307

Quality Assurance  

Directives, Delegations, and Requirements

To establish an effective management system [i.e., quality assurance programs(QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Change 1, dated 7/12/01, facilitates the Department's organizational transition necessitated by establishment of the NNSA. (Attachment 2 of this Order is canceled by DOE O 470.2B.) Cancels: DOE O 414.1

2001-07-12T23:59:59.000Z

308

Project W-314 Specific Test and Evaluation Plan 241-AN-A Valve Pit  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

HAMMERS, J.S.

1999-08-25T23:59:59.000Z

309

Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan  

SciTech Connect

This Systems Engineering Implementation Plan (SEIP) describes the processes, products, and organizational responsibilities implemented by Project W-519 to further define how the project`s mission, defined initially by the Tank Waste Remediation System Phase 1 Privatization Infrastructure Project W-503 Mission Analysis Report (Hoertkorn 1997), will be accomplished using guidance provided by the Tank Waste Remediation System Systems Engineering Management Plan (SEMP) (Peck 1998). This document describes the implementation plans for moving from a stated mission to an executable cost, schedule, and technical baseline and to help ensure its successful completion of those baselines.

Schaus, P.S.

1998-08-19T23:59:59.000Z

310

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

311

Best-In-Class Project Management Initiative Corporate Implementation Plan  

Energy.gov (U.S. Department of Energy (DOE))

To continue Project Management and Contract Management Improvements, DOE EM has developed a vision for building a "Best-in-Class" Project Management and Contract Management organization. Click...

312

Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement  

SciTech Connect

In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures that have been established for the project. The PMP does not address in detail the work that has been completed during the scoping process and preparation of the IP. The PMP has been developed to address the tasks required in preparing the Draft Environmental Impact Statement (DEIS), the public comment period, and the Final Environmental Impact Statement (FEIS).

Reed, R.M.; Saulsbury, J.W.

1993-06-01T23:59:59.000Z

313

Design and implementation of a financial planning and tracking system for the Nova Project  

SciTech Connect

The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation.

Holcomb, F.

1982-01-01T23:59:59.000Z

314

State Energy Assurance Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Assurance Guidelines State Energy Assurance Guidelines State Energy Assurance Guidelines The State Energy Assurance Guidelines were developed by the National Association of State Energy Officials (NASEO) with the assistance of the National Association of Regulatory Utility Commissioners (NARUC) under the direction of the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (OE). The guidelines integrate the lessons learned from responding to energy emergencies in recent years and from the dialogue that has occurred at conferences, exercises and meetings on energy assurance. They encompass many topics that states may wish to consider incorporating into their plans. Foremost among these is how energy assurance can improve: planning and responding quickly and effectively to

315

Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.  

SciTech Connect

This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

Childs, Allen

2002-03-01T23:59:59.000Z

316

Regional Partner Announces Plans for Carbon Storage Project Using CO2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Partner Announces Plans for Carbon Storage Project Using Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant July 20, 2009 - 1:00pm Addthis Washington, DC - Southern Company and the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven members of the U.S. Department of Energy (DOE) Regional Carbon Sequestration Partnerships program, have announced plans to store carbon dioxide (CO2) captured from an existing coal-fired power plant. The project represents a major step toward demonstrating the viability of integrating carbon capture and storage to mitigate climate change. This storage project, located in the Citronelle Oil Field north of Mobile,

317

BPA to share costs with PUDs in regional planning project  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission planning. They will share the costs of building a 14 million high-voltage transmission line in Central Washington developed through collaborative assessment and...

318

Enabling States and Localities to Improve Energy Assurance and Resiliency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enabling States and Localities to Improve Energy Assurance and Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) The Energy Assurance Planning (EAP) Initiative for State and Local Governments is a major element of DOE's effort to improve the Nation's energy sector resiliency. The overall goal of the three-year program is to work toward a more uniform, comprehensive energy assurance and resiliency approach that benefits localities, States, and the Nation. Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) More Documents & Publications Emergency Support Function #12; Energy Annex The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

319

Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.  

SciTech Connect

This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

Childs, Allen B.

2002-03-01T23:59:59.000Z

320

Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.  

SciTech Connect

This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

Bissell, Gael

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Moab Mill Tailings Removal Project Plans to Resume Train Shipments in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans to Resume Train Shipments Plans to Resume Train Shipments in March; All of the Laid Off Workers Will Return Moab Mill Tailings Removal Project Plans to Resume Train Shipments in March; All of the Laid Off Workers Will Return February 25, 2013 - 12:00pm Addthis Media Contacts Donald Metzler, donald.metzler@gjem.doe.gov 970-257-2115 Jeff Biagini, jeff.biagini@gjemrac.doe.gov 970-257-2117 Wendee Ryan, wryan@gjemtac.doe.gov 970-257-2145 Grand Junction, CO - All 27 employees of the Remedial Action Contractor (RAC) to the U.S. Department of Energy will return to work on the Uranium Mill Tailings Remedial Action Project on March 4, following a 3-month planned furlough. Project shipping and disposal operations have been shut down, as planned, since late November 2012, but are scheduled to resume

322

Making European Fisheries Ecosystem Plans Operational EC FP7 project # 212881  

E-Print Network (OSTI)

.2.1.4 Deep Water................................................................................................. 143 1.2.3.4 Deep WaterMEFEPO Making European Fisheries Ecosystem Plans Operational EC FP7 project # 212881 Work Package 1

Hansen, René Rydhof

323

High Burnup Dry Storage Cask Research and Development Project: Final Test Plan  

Energy.gov (U.S. Department of Energy (DOE))

This Test Plan for the High Burnup Dry Storage Research Project (HDRP) outlines the data to be collected, the high burnup fuel to be included, and the storage system design, procedures, and licensing necessary for implementation.

324

The Commonwealth Electric Open Planning Project : final report  

E-Print Network (OSTI)

This report describes the development, application and results of an Open Planning Process performed by the M.I.T. Energy Laboratory's Analysis Group for Regional Electricity Alternatives (AGREA) for, and with the support ...

Andrews, Clinton J.

1991-01-01T23:59:59.000Z

325

Pre-Project planning of Capital Facilities at NASA ; .  

E-Print Network (OSTI)

??This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for (more)

Barrow, Benjamin John.

1999-01-01T23:59:59.000Z

326

Safety Planning Guidance for Hydrogen and Fuel Cell Projects  

Fuel Cell Technologies Publication and Product Library (EERE)

This guidance document provides information on safety requirements for hydrogen and fuel cell projects funded by the U.S. Department of Energy Fuel Cell Technologies Program.

327

Coordinating robot motion, sensing, and control in plans. LDRD project final report  

SciTech Connect

The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

Xavier, P.G.; Brown, R.G.; Watterberg, P.A. [Sandia National Labs., Albuquerque, NM (United States). Intelligent Systems and Robotics Center

1997-08-01T23:59:59.000Z

328

Quality Assurance Specialist  

Energy.gov (U.S. Department of Energy (DOE))

The selectee will serve as a Quality Assurance (QA) Specialist within the Department of Energy Idaho Operations Office (DOE-ID). The Quality Assurance Specialist (QAS) provides specialized...

329

Science and Technology Roadmapping to Support Project Planning  

SciTech Connect

Disciplined science and technology roadmapping provides a framework to coordinate research and development activities with project objectives. This case-history paper describes initial project technology needs identification, assessment and R&D ranking activities supporting characterization of 781 waste tanks requiring a 'hazardous waste determination' or 'verification of empty' decision to meet an Idaho state Voluntary Consent Order.

Mc Carthy, Jeremiah Justin; Haley, Daniel Joseph; Dixon, Brent Wayne

2001-07-01T23:59:59.000Z

330

Central and South Florida Project, Comprehensive Everglades Restoration Plan  

E-Print Network (OSTI)

-related resource needs of the region, including water supply and flood protection. The recommended project. Scientists have established that a mosaic of uplands, freshwater marsh, deep water sloughs, and estuarine significantly declined in remaining natural system areas due to water management projects and practices

US Army Corps of Engineers

331

Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522  

SciTech Connect

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has been overlooked and to verify the inventory. After each site has approved their project plan, the site will begin writing procedures and packaging/repackaging their waste. In some cases the sites have already begun the process. The waste will be shipped after all of the waste has been characterized and approved.

Mctaggart, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [DOE

2009-01-01T23:59:59.000Z

332

Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan  

SciTech Connect

The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

MITCHELL, R.L.

2000-01-10T23:59:59.000Z

333

DOE Order on Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INITIATED BY: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order, is conducted through an integrated and effective management system; (2) Management support for planning, organization, resources, direction, and control is essential to quality assurance (QA); (3) Performance and quality improvement require thorough, rigorous

334

Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices  

SciTech Connect

Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

Bechtel Nevada

1998-12-31T23:59:59.000Z

335

Moab Mill Tailings Removal Project Plans to Resume Train Shipments...  

Energy Savers (EERE)

result in a cost savings to the project over the long term. Made of -inch durable plastic, the liners will prevent the tailings material, which tends to be sticky, from...

336

EV Community Readiness projects: South Florida Regional Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 - End: June 2013 - 90% Complete * BUDGET - Total Project Funding: 500,000 * DOE: 500,000 * Cost Share: 0 - 371,666 spent (74%) (as of 32213) * BARRIERS ADDRESSED...

337

Shippingport Station Decommissioning Project decommissioning plan. Volume I  

SciTech Connect

Information is presented concerning the organization of the decommissioning project; decommissioning operations concept; safety and environmental assessment; information and guidance for the DOC; work breakdown structure; decommissioning operation schedule; decommissiong operations estimate; and training requirements.

Not Available

1983-09-01T23:59:59.000Z

338

Quality Assurance Exchange, September 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 S e p t e m b e r 2 0 0 5 I N T H E S P O T L I G H T : I N T E R V I E W W I T H C H I P L A G D O N A C T I N G C H I E F O F N U C L E A R S A F E T Y E N E R G Y , S C I E N C E A N D E N V I R O N M E N T I N S I D E T H I S I S S U E : In the Spotlight: Interview with Chip Lagdon, acting CENS 1 Lessons Learned from SQA Assessments 2 SQA Work Activity 1-Software Project Manage- ment & Quality Planning & ASME NQA-1-2000 3 Announcements, Updates, and Activities 7 DOE Order 414.1C Rollout 1 Upcoming Meetings &Workshops 8 S/CI Items Video Conference 6 Q U A L I T Y A S S U R A N C E E X C H A N G E DOE ORDER 414.1C ROLLOUT The Quality Assurance Order Rollout Video Conferences were held July 25 th and August 4 th , 2005, at the DOE For- restal Building, Washington, D.C. Over 20 DOE sites nationwide participated in the video conferences. The primary

339

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

340

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481  

SciTech Connect

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

Alleman, Glen B. [DOD Programs, Project Time and Cost (United States); Nosbisch, Michael R. [Managing Principle, Western Region, Project Time and Cost (United States)

2012-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Track 9: Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE))

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 9: Quality Assurance

342

Energy Assurance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assurance Assurance Energy Assurance The Energy Sector consists of thousands of electricity, oil, and natural gas assets that are geographically dispersed and connected by systems and networks. Therefore, interdependency within the sector and across the Nation's critical infrastructure sectors is critical. The energy infrastructure provides fuel to the Nation, and in turn depends on the Nation's transportation, communications, finance, and government infrastructures. The energy systems and networks cross the Nation's borders, making international collaboration a necessary component of the Energy Sector's efforts. Protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters is an ongoing effort that requires continued vigilance, contingency planning, and training. With partnership

343

Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project  

SciTech Connect

As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INLs contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE and commercial disposal options exist for contact-handled LLW; however, offsite disposal options are either not currently available (i.e., commercial disposal facilities), practical, or cost-effective for all remote-handled LLW streams generated at INL. Offsite disposal of all INL and tenant-generated remote-handled waste is further complicated by issues associated with transporting highly radioactive waste in commerce; and infrastructure and processing changes at the generating facilities, specifically NRF, that would be required to support offsite disposal. The INL Remote-Handled LLW Disposal Project will develop a new remote handled LLW disposal facility to meet mission-critical, remote-handled LLW disposal needs. A formal DOE decision to proceed with the project has been made in accordance with the requirements of National Environmental Policy Act (42 USC 4321 et seq.). Remote-handled LLW is generated from nuclear programs conducted at INL, including spent nuclear fuel handling and operations at NRF and operations at the Advanced Test Reactor. Remote-handled LLW also will be generated by new INL programs and from segregation and treatment (as necessary) of remote handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex.

Danny Anderson

2014-07-01T23:59:59.000Z

344

Early prediction of the performance of green building projects using pre-project planning variables: data mining approaches  

Science Journals Connector (OSTI)

Abstract Early prediction of the success of green building projects is an important and challenging issue. The aim of this study was to develop a model to predict the cost and schedule performance of green building projects based on the level of definition during the pre-project planning phase. To this end, a three-step process was proposed: pre-processing, variable selection, and prediction model construction. Data from 53 certified green buildings were used to develop the models. After balancing the data set with respect to the proportion of cases in each of the outcome categories by pre-processing, the number of input variables was reduced from 64 to 13 and 7 for cost and schedule performance prediction respectively, using the ReliefF-W variable selection method. Then, cost and schedule performance prediction models were constructed using the selected variables and four different classifiers: a support vector machine (SVM), a back-propagation neural network (BPNN), a C4.5 decision tree algorithm (C4.5), and a logistic regression (LR). The classification performance of the four models was compared to assess their applicability. The SVM models exhibited the highest accuracy, sensitivity, and specificity in predicting both the cost and schedule performance of green building projects. The results of this study empirically validated that the cost and schedule performance of green building projects is highly dependent on the quality of definition in the pre-project planning phase.

Hyojoo Son; Changwan Kim

2014-01-01T23:59:59.000Z

345

Quality Assurance Corporate Board | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance » Quality Quality Assurance » Quality Assurance Corporate Board Quality Assurance Corporate Board The Office of Environmental Management (EM) Quality Assurance Corporate Board is an executive board that includes both senior U.S. Department of Energy (DOE) and contractor representatives who are involved with construction, operating, and decommissioning projects. The Board acts in an advisory capacity to the EM Deputy Assistant Secretary for the Safety and Security Program, who is the Chief Executive Officer and Chair of the Board. Decisions on the Corporate Board's recommendations are acted on by EM senior management. The Corporate Board provides the management structure to integrate the independently managed federal and contractor Quality Assurance Programs into a single corporate entity. The Board serves as a consensus-building

346

Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor  

SciTech Connect

This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

MERCADO, L.C.

2000-04-22T23:59:59.000Z

347

Distribution System planning for Smart Grids, ForskEL (Smart Grid Project)  

Open Energy Info (EERE)

planning for Smart Grids, ForskEL (Smart Grid Project) planning for Smart Grids, ForskEL (Smart Grid Project) Jump to: navigation, search Project Name Distribution System planning for Smart Grids, ForskEL Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

348

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

349

SOPP-43, EM-23 Quality Assurance Oversight  

Energy.gov (U.S. Department of Energy (DOE))

Procedure to describe the process that will be utilized by the EM Office of Standards and Quality Assurance to guide its activities related to oversight and audit of the EM Field/site, project, and...

350

Implementation of an Integrated Quality Assurance Program for a CT-TPS Process.  

E-Print Network (OSTI)

??Systematic constancy and accuracy of a treatment planning system (TPS) are crucial for the entire radiation treatment planning process (TPP). The Quality Assurance (QA) of (more)

Wu, Junqing

2002-01-01T23:59:59.000Z

351

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Directives, Delegations, and Requirements

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

352

Jackson Bluff Hydroelectric Project: emergency action plan, City of Tallahassee  

SciTech Connect

Jackson Bluff Dam is located on the Ochlockonee River about 66 miles upstream from its mouth at the Gulf of Mexico and approximately 20 miles west-southwest of the City of Tallahassee. The site is situated in Leon, Gadsden, and Liberty counties. The dam consists of a 3600 ft long earth embankment with the crest at EL. 77 (MSL). About 1000 ft north of the end of the main dam is a saddle dam. The saddle dam is approximately 550 ft long and has crest at EL 72.3 (4.7 ft below the main dam). The gated spillway and the powerhouse are located at the southeast end of the dam. The purpose of the Emergency Action Plan is to specify actions to be taken in the event of flooding of the downstream of the Ochlockonee River due to failure of the dam.

Not Available

1984-05-01T23:59:59.000Z

353

UMTRA project water sampling and analysis plan, Durango, Colorado  

SciTech Connect

Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

Not Available

1994-01-01T23:59:59.000Z

354

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project  

SciTech Connect

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

Dodds, K.; Daley, T.; Freifeld, B.; Urosevic, M.; Kepic, A.; Sharma, S.

2009-05-01T23:59:59.000Z

355

Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables  

Science Journals Connector (OSTI)

An accurate prediction of project performance in the pre-project planning stage especially prediction of cost performance is paramount to project stakeholders. The aim of this study is to propose and validate a hybrid predictive model for cost performance of commercial building projects using 64 variables related to the levels of definition in the pre-project planning stage. The proposed model integrates a support vector regression (SVR) model with principal component analysis (PCA). The proposed method was analyzed and validated based on 84 sets of data from an equal number of commercial building projects. Additionally, the result obtained using the proposed PCASVR model was compared with four other data-mining techniques. Experimental results revealed that the proposed PCASVR model is able to predict with high accuracy the cost performance of commercial building projects in the pre-project planning stage and is more efficient than the other four models.

Hyojoo Son; Changmin Kim; Changwan Kim

2012-01-01T23:59:59.000Z

356

Tank waste remediation system characterization project quality policies  

SciTech Connect

This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer`s quality requirements known as the `RULE`, 10 CFR 830.120, Quality Assurance.

Board, D.C.

1997-09-24T23:59:59.000Z

357

Tank waste remediation system characterization project quality policies  

SciTech Connect

This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised on eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer`s quality requirements known as the `RULE`, 10 CFR 830.120, Quality Assurance.

Trible, T.C., Westinghouse Hanford

1996-07-31T23:59:59.000Z

358

Recovery Act: Enhancing State Energy Assurance  

Energy.gov (U.S. Department of Energy (DOE))

States are using these funds to plan for energy supply disruption risks and vulnerabilities to lessen the devastating impact that such incidents can have on the economy and the health and safety of the public. Includes links to Energy Assurance Planning Bulletins (January 2010 - October 2012)

359

Draft reclamation program plan for site characterization; Yucca Mountain project  

SciTech Connect

As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation`s first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs.

NONE

1989-08-01T23:59:59.000Z

360

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan  

SciTech Connect

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

none,

2014-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Office of Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Quality Assurance establishes and maintains the quality assurance (QA) policies, requirements and guidance for the Department and serves as DOE's corporate resource to ensure that products and services meet or exceed the Departments quality objectives.

362

Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan  

SciTech Connect

This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

RIECK, C.A.

1999-02-23T23:59:59.000Z

363

Chernobyl shelter implementation plan -- project development and planning: Setting the stage for progress  

SciTech Connect

On April 26, 1986, the Chernobyl nuclear power plant (NPP) experienced a devastating accident. This accident left much of the plant and its safety systems destroyed with widespread radioactive waste contamination from the damaged nuclear fuel. In the 6 months following the accident, heroic measures were taken to stabilize the situation and erect a temporary confinement shelter over the damaged unit 4. Since that time the shelter and the contained radioactive materials and debris have begun to deteriorate. Lack of funding and staff has allowed only minor improvements to occur on-site, resulting in an existing shelter that is unstable and deteriorating. International aid has been provided to develop a comprehensive plan for the safe and environmentally sound conversion of the damaged Chernobyl reactor. These efforts are being performed in conjunction with US experts, European experts, and local Chernobyl NPP personnel. This plan is discussed here.

Johnson, W. [Parsons Infrastructure and Technology Group, Richland, WA (United States); Kreid, D. [Pacific Northwest National Lab., Richland, WA (United States); DeFranco, W. [Science Applications International Corp., Oak Ridge, TN (United States)

1998-09-01T23:59:59.000Z

364

Construction quality assurance report  

SciTech Connect

This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.

Roscha, V.

1994-09-08T23:59:59.000Z

365

Project Plan Field Assessment of the Effectiveness of DiazaConTM on Reducing Gray  

E-Print Network (OSTI)

Project Plan Field Assessment of the Effectiveness of DiazaConTM on Reducing Gray Squirrel that the contraceptive was effective in preventing reproduction in both male and female squirrels. However, the cost of capturing and vaccinating individual EGS with GonaConTM was $15/squirrel and proved to be cost prohibitive

Bolding, M. Chad

366

The Two-Column Aerosol Project (TCAP) Science Plan  

SciTech Connect

The Two-Column Aerosol Project (TCAP) field campaign will provide a detailed set of observations with which to (1) perform radiative and cloud condensation nuclei (CCN) closure studies, (2) evaluate a new retrieval algorithm for aerosol optical depth (AOD) in the presence of clouds using passive remote sensing, (3) extend a previously developed technique to investigate aerosol indirect effects, and (4) evaluate the performance of a detailed regional-scale model and a more parameterized global-scale model in simulating particle activation and AOD associated with the aging of anthropogenic aerosols. To meet these science objectives, the Atmospheric Radiation Measurement (ARM) Climate Research Facility will deploy the ARM Mobile Facility (AMF) and the Mobile Aerosol Observing System (MAOS) on Cape Cod, Massachusetts, for a 12-month period starting in the summer of 2012 in order to quantify aerosol properties, radiation, and cloud characteristics at a location subject to both clear and cloudy conditions, and clean and polluted conditions. These observations will be supplemented by two aircraft intensive observation periods (IOPs), one in the summer and a second in the winter. Each IOP will deploy one, and possibly two, aircraft depending on available resources. The first aircraft will be equipped with a suite of in situ instrumentation to provide measurements of aerosol optical properties, particle composition and direct-beam irradiance. The second aircraft will fly directly over the first and use a multi-wavelength high spectral resolution lidar (HSRL) and scanning polarimeter to provide continuous optical and cloud properties in the column below.

Berkowitz, CM; Berg, LK; Cziczo, DJ; Flynn, CJ; Kassianov, EI; Fast, JD; Rasch, PJ; Shilling, JE; Zaveri, RA; Zelenyuk, A; Ferrare, RA; Hostetler, CA; Cairns, B; Russell, PB; Ervens, B

2011-07-27T23:59:59.000Z

367

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

368

The project RTPPP (Development of a realtime PPP processing facility) is planned to be a followup project of RAPPP (Innovative Algorithms for Rapid Precise Point Positioning),  

E-Print Network (OSTI)

RTPPP The project RTPPP (Development of a realtime PPP processing facility) is planned to be a followup project of RAPPP (Innovative Algorithms for Rapid Precise Point Positioning), which has RAPPP, the proposed project RTPPP concentrates on the possibilities of the PPP technique within a real

Schuh, Harald

369

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 61 Appendix 6.7  

E-Print Network (OSTI)

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 61 Appendix 6 for Global Benefits, Uganda 62 Appendix 6.7 16. What size (ha) are they: Farm 1. ____________ Farm 2 if necessary #12;Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 63 Appendix 6

370

Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Quality Assurance Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to accommodate the UFDC. The FCT QAPD provides a sound and useable foundation for the implementation of QA for UFDC R&D activities, including the application of QA in a graded approach. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan More Documents & Publications Used Fuel Disposition Campaign International Activities Implementation Plan

371

Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2  

SciTech Connect

A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

Phillips, D.R.

1994-07-01T23:59:59.000Z

372

Quality assurance program for isotopic power systems  

SciTech Connect

This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented.

Hannigan, R.L.; Harnar, R.R.

1982-12-01T23:59:59.000Z

373

Quality Assurance Source Requirements Traceability Database  

SciTech Connect

At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

2006-01-30T23:59:59.000Z

374

U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan  

Office of Legacy Management (LM)

GWMON 1.12-1 GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction ....................................................................................................................... 1 2.0 Purpose and Scope ........................................................................................................... 1 3.0 Pilot-Test Extraction Wellfield 2 4.0 Water Elevation Measurements and Monitoring ............... 4

375

Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for Tank 48H Treatment Project (TTP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Westinghouse Savannah River Company LLC Westinghouse Savannah River Company LLC Savannah River Site Aiken, SC 29808 LWO-SPT-2007-00247 Rev. 1 Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) For Tank 48H Treatment Project (TTP) November, 2007 Technology Maturation Plan (TMP) Wet Air Oxidation (WAO) Technology for Tank 48H Treatment Project (TTP) LWO-SPT-2007-00247 Rev. 1 DISCLAIMER This report was prepared by Washington Savannah River Company (WSRC) for the United States Department of Energy under Contract No. DEA-AC09-96SR18500 and is an account of work performed under that contract. Neither the United States Department of Energy, nor WSRC, nor any of their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

376

Project W-314 specific test and evaluation plan for AZ tank farm upgrades  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-08-12T23:59:59.000Z

377

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Burgard, K.G.

1998-09-24T23:59:59.000Z

378

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 50 Appendix 6.6  

E-Print Network (OSTI)

Socio-economic benefits in Plan Vivo projects: Trees for Global Benefits, Uganda 50 Appendix 6 Vivo projects: Trees for Global Benefits, Uganda. 2. The Questionnaire 2.1. Sampling methodology Vivo projects: Trees for Global Benefits, Uganda 51 Appendix 6.6 the nearest house, or the next

379

Implementation Plan for Tank Farm Transition Projects Suspect and Counterfeit Items  

SciTech Connect

This plan is designed to provide an appropriate level of confidence that Tank Farm Transition Projects (TFTP) facilities will be evaluated to assess the presence of suspect/counterfeit items. It is intended to identify suspect/counterfeit items that are presently in inventory and provide for the reporting and disposition of those items. Items which have been installed will also receive appropriate evaluation using a graded approach to achieve optimum results balanced against safety considerations and cost effectiveness.

TRUE, R.R.

2000-03-16T23:59:59.000Z

380

Quality assurance | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality assurance Quality assurance Subscribe to RSS - Quality assurance Quality: the characteristics of a product or service that bear on its ability to satisfy stated or implied needs. Quality Assurance: the planned and systematic activities implemented to provide confidence that a product or service will fulfill its requirements for quality. PPPL teams up with USDA to produce new egg pasteurization method Researchers at the Princeton Plasma Physics Laboratory (PPPL) and the U.S. Department of Agriculture (USDA) have developed a novel technique and device for rapidly pasteurizing eggs in the shell without damaging the delicate egg white. The process could lead to a sharp reduction in illnesses caused by egg-borne salmonella bacteria, a widespread public health concern.

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Section 22: Quality Assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Assurance (40 CFR 194.22) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification...

382

Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.  

SciTech Connect

This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.

Childs, Allen B.

2002-02-01T23:59:59.000Z

383

EM Quaility Assurance Program (EM-QA-001 Revision 1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM-QA-001 EM-QA-001 Rev. 1 Issue Date 06/11/12 2 Project lifecycles including design, engineering, construction, commissioning, operation, and post-operation, e.g., surveillance and maintenance, deactivation, decommissioning, and environmental restoration. 3.0 APPLICABILITY The requirements contained within this document apply to EM HQ, EM Field/Project Offices, and EM contractors (including flow down to subcontractors, vendors, and suppliers) as applicable to the work being performed by each entity. Each organization will have an organizational-specific Quality Assurance Implementation Plan (QIP) describing how the applicable requirements of this QAP are implemented and/or passed down to lower- tier organizations. This requirement does not alter personnel (i.e., federal, contractor, or

384

Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Used Fuel Disposition Campaign Preliminary Quality Assurance Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to accommodate the UFDC. The FCT QAPD provides a sound and useable foundation for the implementation of QA for UFDC R&D activities, including the application of QA in a graded approach. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan More Documents & Publications

385

HLW System Integrated Project Team  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

l l W S Hi h l W S High Level Waste System High Level Waste System Integrated Project Team Integrated Project Team Integrated Project Team Integrated Project Team Steve Schneider Steve Schneider Office of Engineering and Technology High Level Waste Corporate Board March 5, 2009 This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations, while also assuring that essential functions necessary to protect human health, the environment and national security are maintained. 1 Introduction Introduction Introduction Introduction Challenges and Priorities High Level Waste Strategic Initiative Results High Level Waste System Integrated

386

ICDP Complex Groundwater Monitoring Plan REV 5  

SciTech Connect

This Groundwater Monitoring Plan, along with the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions, constitutes the sampling and analysis plan for groundwater and perched water monitoring at the Idaho CERCLA Disposal Facility (ICDF). A detection monitoring system was installed in the Snake River Plan Aquifer to comply with substantive requirements of "Releases from Solid Waste Management Units" of the Resource Conservation and Recovery Act. This detection monitoring wells constructed in the Snake River Plain Aquifer.

Cahn, L. S.

2007-08-09T23:59:59.000Z

387

Infrastructure Assurance Center  

E-Print Network (OSTI)

, the United States relied on natural gas to meet about 22% of its energy needs. Therefore, assuring efficient, natural gas processing plants, and other industrial customers, along with the changes in the utilizationInfrastructure Assurance Center NGReal-time: processing and analysis tool for natural gas delivery

388

Quality Assurance Corporate Board | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Quality Assurance Corporate Board Quality Assurance Corporate Board The Office of Environmental Management (EM) Quality Assurance Corporate Board is an...

389

CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance - Oak Ridge National Laboratory TRU ALPHA Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project November 2003 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Quality Assurance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Quality Assurance - Oak Ridge National Laboratory TRU ALPHA LLWT Project More Documents & Publications

390

Phase 1 Final status survey plan for the West Valley demonstration project.  

SciTech Connect

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

Johnson, R. L. (Environmental Science Division)

2011-05-31T23:59:59.000Z

391

Office of Standards & Quality Assurance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards & Quality Standards & Quality Assurance Office of Standards & Quality Assurance Hanford 100-HX facility Joe Guyette, Quality Assurance, inspects equipment ready for operations to begin in the 100-HX groundwater treatment facility. Hanford 100-HX facility Joe Guyette, Quality Assurance, inspects equipment ready for operations to begin in the 100-HX groundwater treatment facility. The Office of Standards and Quality Assurance ensures that the necessary technical, safety and quality requirements and standards are properly identified and put in place for all line-item, EM capital and major operating projects and facilities in a timely and technically sound manner. Major Responsibilities Ensure Quality Assurance (QA) standards are being consistently applied so that all EM projects are completed safely and correctly.

392

Microsoft Word - qa_plan1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SJ-RT SJ-RT Smith Jones Rapid Transit Software Quality Assurance Plan February 1997 U. S. DEPARTMENT OF ENERGY Replace with appropriate organization name qa_plan1.doc ii 02/27/07 Change Control Page The following information is being used to control and track modifications made to this document. 1) Revision Date: mm/dd/yy Author: Section(s): Page Number(s): Summary of Change(s): 2) Revision Date: mm/dd/yy Author: Section(s): Page Number(s): Summary of Change(s): qa_plan1.doc iii 02/27/07 Title Page Document Name: Smith Jones Rapid Transit (SJ-RT) Software Quality Assurance Plan (SQAP) Publication Date: February 2007 Revision Date: Contract Number: Project Number: Prepared by: M. Polo Approval: __________________________

393

PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13  

SciTech Connect

This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule).

D. H. BULTMAN; D. WEINACHT - AIRES CORP.

2000-08-01T23:59:59.000Z

394

Site observational work plan for the UMTRA Project site at Falls City, Texas  

SciTech Connect

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

395

2012 Annual Workforce Analysis and Staffing Plan Report - West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTACHMENT ATTACHMENT 1 Annual Workforce Analysis and Staffing Plan Report As ofDecember 31, 2012 Reporting Office: West Valley Demonstration Project Section 1: Current Mission(s) of the Organization and Potential Changes The mission of the WVDP as defined by the West Valley Demonstration Project Act (Public Law 96-368) is to accomplish five activities: 1) solidify high-level radioactive waste (HLW), 2) develop containers suitable for permanent disposal of the HLW, 3) transport the HLW to a Federal repository for permanent disposal, 4) dispose of low-level and transuranic waste produced by the solidification of the HLW, and 5) decontaminate and decommission the HLW tanks and facilities, materials and hardware used to solidify the HLW. DOE expects to accomplish these WVDP activities through proactive leadership, management, and implementation of safe and environmentally sound operations.

396

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

397

Report: EM Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM QUALITY ASSURANCE EM QUALITY ASSURANCE September 25, 2008 Submitted by the EMAB Quality Assurance Subcommittee Background: In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to dialogue with the Office of Quality Assurance (EM-60, QA) as it works to revitalize standards and institutionalize QA into Departmental and EM processes. In addition, EMAB was directed to dialogue with EM-60 on incorporating QA and engineering into the procurement process. Board members reviewed and discussed the topics of QA and EM-60's functions during their public meeting on May 7, 2008, in Washington D.C. The EMAB QA Subcommittee comprised of Dr. Lawrence Papay, Mr. G. Brian Estes, and Mr. Tom Winston, continued to explore the issues presented in May and engaged in follow-up

398

Software Quality Assurance  

Directives, Delegations, and Requirements

DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01. To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). Does not cancel other directives.

2000-10-02T23:59:59.000Z

399

Software Quality Assurance  

Directives, Delegations, and Requirements

To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.

2000-10-02T23:59:59.000Z

400

Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000  

SciTech Connect

This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

DOE /NV

2000-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

File:Experiencing PBL The Wind Power Project lesson plan.pdf | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:Experiencing PBL The Wind Power Project lesson plan.pdf Jump to: navigation, search File File history File usage Metadata File:Experiencing PBL The Wind Power Project lesson plan.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 55 KB, MIME type: application/pdf, 3 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 09:27, 3 January 2014 Thumbnail for version as of 09:27, 3 January 2014 1,275 × 1,650, 3 pages (55 KB) Foteri (Talk | contribs) Category:Wind for Schools Portal CurriculaCategory:Wind for Schools Middle School Curricula

402

The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation  

SciTech Connect

The Woodlands is a HUD Title VII New Town located near Houston, including 22,000 acres; the plan for the new town consists of 6 residential villages, a town center (Metro), and a Trade Center for larger-scale industrial use. Included within the program for each village are schools and commercial activities, as well as employment activities. The Woodlands is planned to be developed over a 26-year period (commenced in 1972) with an ultimate population of 150,000. Following a summary chapter, Chapter II presents background material on The Woodlands and results of the study are summarized. Chapter III describes the project team and its organizational structure. Chapter IV outlines and documents the methodology that was employed in developing, analyzing, and evaluating the case study. The next chapter describes and analyzes the conventional plan, documents the process by which energy-conserving methods were selected, and evaluates the application of these methods to the Metro Center Study area. Chapter VI discusses constraints to implementation and is followed by a final chapter that presents the general conclusions from the case study and suggests directions for further investigation.

Not Available

1980-03-01T23:59:59.000Z

403

TASK TECHNICAL AND QUALITY ASSURANCE PLAN FOR THE CHARACTERIZATION AND LEACHING OF A THERMOWELL AND CONDUCTIVITY PROBE PIPE SAMPLE FROM TANK 48H  

SciTech Connect

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. The material on the Tank 48H internal tank surfaces is estimated to have a total volume of approximately 115 gallons consisting of mostly water soluble solids with approximately 20 wt% insoluble solids (33 Kg TPB). This film is assumed to be readily removable. The material on the internal equipment/surfaces of Tank 48H is presumed to be easily removed by slurry pump operation. For Tank 49H, the slurry pumps were operated almost continuously for approximately 6 months after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids--Na{sub 3}H(CO){sub 2}, Al(OH){sub 3}, NaTPB, NaNO{sub 3} and NaNO{sub 2}. Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. Depending on when the Recycle material or inhibited water can be added to Tank 48H, the tank may not be allowed to agitate for this same amount of time. The tank will be filled above 150 inches and agitated at least once during the Aggregation process. If the material cannot be removed after completion of these batches, the material may be removed with additional fill and agitation operations. There is a risk that this will not remove the material from the internal surfaces. As a risk mitigation activity, properties of the film and the ease of removing the film from the tank will be evaluated prior to initiating Aggregation. This task will investigate the dissolution of Tank 48H solid deposits in inhibited water and DWPF recycle. To this end, tank personnel plan to cut and remove a thermowell pipe from Tank 48H and submit the cut pieces to SRNL for both characterization and leaching behavior. A plan for the removal, packaging and transport of the thermowell pipe has been issued. This task plan outlines the proposed method of analysis and testing to estimate (1) the thickness of the solid deposit, (2) chemical composition of the deposits and (3) the leaching behavior of the solid deposits in inhibited water (IW) and in Tank 48H aggregate solution.

Fondeur, F

2005-11-02T23:59:59.000Z

404

West Valley Demonstration Project Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 7 Hazards Survey and Hazards Assessment .................................... 7 Program Plans and Procedures ..................................................... 8 Emergency Responder Performance .......................................... 10 Feedback and Continuous Improvement....................................

405

Princeton Plasma Physics Lab - Quality assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

quality-assurance Quality: the quality-assurance Quality: the characteristics of a product or service that bear on its ability to satisfy stated or implied needs.Quality Assurance: the planned and systematic activities implemented to provide confidence that a product or service will fulfill its requirements for quality. en PPPL teams up with USDA to produce new egg pasteurization method http://www.pppl.gov/news/press-releases/2013/09/pppl-teams-usda-produce-new-egg-pasteurization-method

Researchers at the Princeton Plasma Physics Laboratory (PPPL) and the U.S. Department of Agriculture (USDA) have developed a novel technique

406

Phase 1 Characterization sampling and analysis plan West Valley demonstration project.  

SciTech Connect

The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

Johnson, R. L. (Environmental Science Division)

2011-06-30T23:59:59.000Z

407

RMOTC - Testing - Flow Assurance  

NLE Websites -- All DOE Office Websites (Extended Search)

Flow Assurance Flow Assurance RMOTC Flow Loop Facility Layout Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. Over a decade ago, RMOTC began cooperatively building a full-scale facility to test new flow assurance technology, mainly in the areas of hydrates and paraffins. Today, RMOTC's test facility consists of five individual loop

408

A Handbook for Planning and Conducting Charrettes for High-Performance Projects, 2nd edition  

NLE Websites -- All DOE Office Websites (Extended Search)

Operated by the Alliance for Sustainable Energy, LLC A Handbook for Planning and Conducting Charrettes for High-Performance Projects ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring

409

DOE/SC-ARM-11-017 The Two-Column Aerosol Project (TCAP) Science Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 The Two-Column Aerosol Project (TCAP) Science Plan CM Berkowitz Principal Investigator LK Berg RA Zaveri DJ Cziczo A Zelenyuk CJ Flynn RA Ferrare EI Kassianov CA Hostetler JD Fast B Cairns PJ Rasch PB Russell JE Shilling B Ervens July 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service

410

Software Verification and Validation Plan Activities, 2011, Project Number: N6423, SAPHIRE Version 8  

SciTech Connect

The SV&V Plan experienced changes over the past year to bring it into the operational software life cycle of SAPHIRE 8 and to maintain its sections on design features. Peer review of the SVVP with the former IV&V members identified the need for the operational use of metrics as a tool for quality maintenance and improvement. New tests were added to the SVVP to verify the operation of the new design features incorporated into SAPHIRE 8. Other additions to the SVVP were the addition of software metrics and the PDR and CDR processes. Audit support was provided for the NRC Technical Manager and Project Manager for the NRC OIG Audit performed throughout 2011. The SVVP is considered to be an up to date reference and useful roadmap of verification and validation activities going forward.

Kurt G. Vedros; Curtis L. Smith

2011-11-01T23:59:59.000Z

411

Quality Assurance REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Quality Assurance Qualification Standard DOE-STD-1150-2002 July 2012 Reference Guide The Functional Area Qualification Standard References Guides are developed to assist operators, maintenance personnel, and the technical staff in the acquisition of technical competence and qualification within the Technical Qualification Program. Please direct your questions or comments related to this document to the Office of Leadership and Career Management, Technical Qualification Program (TQP) Manager, Albuquerque Complex. This page is intentionally blank. Table of Contents i FIGURES ....................................................................................................................................... ii TABLES ........................................................................................................................................ iii

412

Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project  

SciTech Connect

This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle.

Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

1998-10-16T23:59:59.000Z

413

Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning  

SciTech Connect

The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

Jones, M.E. [EG& G Rocky Flats, Inc., Englewood, CO (United States); Shain, D.I. [EG& G Rocky Flats, Inc., Golden, CO (United States)

1994-12-31T23:59:59.000Z

414

Software Quality Assurance: Directives and Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

Directives and Guidance Directives and Guidance DOE O 414.1D, Quality Assurance DOE G 414.1-4, Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance DOE Order O 414.1D, Quality Assurance, includes Attachment 4 addressing SQA requirements for nuclear safety applications at DOE nuclear facilities. The DOE O 414.1D was issued April 25, 2011. This Order and its associated Guide for safety software, DOE G 414.1-4, Safety Software Guide for use with 10 CFR 830 Subpart A, Quality Assurance Requirements. The Order identifies 10 software quality work activities that are to be performed using the graded approach specified in the Order. These 10 work activities are: (1) software project management, (2) software risk management, (3) software configuration management, (4) procurement and vendor management, (5) software requirements identification and management, (6) software design and implementation, (7) software safety design, (8) verification and validation, (9) problem reporting and corrective action, and (10) training of personnel in the design, development, use and evaluation of safety software. These 10 work activities were consolidated from practices and activities identified in several well known consensus standards and federal requirements. Safety software must be acquired, developed and implemented using ASME NQA-1-2008 with the NQA-1a-2009 addenda (or later edition), Quality Assurance Requirements for Nuclear Facility Applications, Part 1 and Subpart 2.7, or other national or international consensus standards that provide an equivalent level of quailty assurance requirements as NQA-1-2008.

415

The project for the historic center of Genoa : toward the integration of urban planning and design  

E-Print Network (OSTI)

A current concern in planning and architecture is the apparent inability of either profession to provide quality urban environments. Frequently the problem is attributed to the gap that exists between the plan and planning ...

Mehren, Barbara Theodora

1984-01-01T23:59:59.000Z

416

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

417

Planning and Implementation of an Alkali-Surfactant-Polymer (ASP) Field Project  

SciTech Connect

The Warden ASP project has progressed from the initial planning stage to construction of an injection plant. An ASP chemical system was designed based on laboratory evaluations that included interfacial tension, mobility requirements, rock-alkali interaction, fluid capabilities, and core tests. Field cores were obtained from the Permian No. 5 and No. 6 sands on the Warden lease in Sho-Vel-Tum oil field. A separate tank battery for the pilot pattern area was installed, and a field tracer test is currently being evaluated. Tracer test results to date indicate that there is no major fracturing in the No. 5 sand. There is indication, however, of some channeling through high permeability sand. The field injection plant was designed, and construction is in progress. Several variations of injection plant design have been evaluated. Some plant design details, such as alkali storage, were found to be dependent on the availability of use equipment and project budget. The surfactant storage facility design was shown to be dependent on surfactant rheology.

French, T.

1999-03-05T23:59:59.000Z

418

Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.  

SciTech Connect

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see Table 5). Purchases are itemized in Appendix D and E. FishPro, Inc. assisted tribal staff with equipment purchases. The unspent contract balances will be carried forward to the ensuing year to complete equipment purchases essential to hatchery operations. The NPTH activities focused on completion of the Northwest Power Planning Council Step-3 decision that authorized hatchery construction. Construction began in July 2000. It is anticipated to continue through October 2002. At the end of 2001, the hatchery facilities were approximately 70% completed and the budget approximately 90% expended. The following facilities are either completed or in final stages of construction: (1) NPTH Central Hatchery facility at Site 1705, and (2) North Lapwai Valley satellite, and (3) Sweetwater Springs satellite, and (4) Yoosa-Camp satellite, and (5) Newsome Creek satellite, and (6) Lukes Gulch satellite, and (7) Cedar Flats satellite.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2006-03-01T23:59:59.000Z

419

DOE/EA-1611: Mitigation Action Plan for the Colorado Highlands Wind Project, Logan County, Colorado (01/19/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 19, 2009 January 19, 2009 Mitigation Action Plan Colorado Highlands Wind Project Logan County, Colorado Project Overview. Western Area Power Administration (Western) a power marketing agency of the U.S. Department of Energy (DOE) proposes to approve interconnection of the Project with Western's transmission system and the connected action of the Project. Colorado Highlands Wind LLC (CHWP) applied (via predecessor project owner Wind Energy Prototypes) to Western to interconnect a 90-megawatt (MW) wind power facility with Western's existing Sterling-Frenchman Creek 115-kV transmission line. Approval of the Interconnection Agreement would allow the Project to interconnect with Western's proposed Wildhorse Creek Switchyard. In accordance with the DOE NEPA

420

Software Quality Assurance Control of Existing Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Software Quality Assurance Control of Existing Systems | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Assurance Control of Existing Systems Assurance Control of Existing Systems Software Quality Assurance Control of Existing Systems Existing software systems often represent significant investments and play important roles in the every day businesses of organizations. To meet current and future operational needs, organizations need to plan how best to address these support issues. Some of the issues to consider are presented in this document with references to related standards for further detailed examination. Two tutorials, one based on software maintenance and another detailing a baseline recovery strategy are included Software Quality Assurance Control of Existing Systems More Documents & Publications Software Quality Assurance Control of Existing Systems Software Quality: A Guide to Responsibilities and Resources, SQAS

422

Quality Assurance Program Guide  

Directives, Delegations, and Requirements

The directive provides guidance for DOE elements and contractors in developing and implementing an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Superseded by Admin Chg 1, 9-27-11.

2011-08-16T23:59:59.000Z

423

Quality Assurance Program Guide  

Directives, Delegations, and Requirements

This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.4-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

2011-08-16T23:59:59.000Z

424

Quality Assurance Program Guide  

Directives, Delegations, and Requirements

This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

2011-08-16T23:59:59.000Z

425

RUNWAY OPERATIONAL QUALITY ASSURANCE  

E-Print Network (OSTI)

RUNWAY OPERATIONAL QUALITY ASSURANCE MELANIE BAKER, DARIC MEGERSA & ALFONSO PANLILIO Sponsors: Dr Vortex Separation Rule, for a homogeneous fleet mix, is determined by the time between arriving aircraft Occupancy (SRO) rule, for a non- homogeneous fleet mix, MTC= 3600/ [ROT] [ROT]= = i (pi *ROTi) ROT (in sec

426

Recovery Act: Enhancing State Energy Assurance | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Enhancing State Enhancing State Energy Assurance Recovery Act: Enhancing State Energy Assurance States are using these funds to plan for energy supply disruption risks and vulnerabilities to lessen the devastating impact that such incidents can have on the economy and the health and safety of the public. Each state is required to track energy emergencies to assess the restoration and recovery times of any supply disruptions; to train appropriate personnel on energy infrastructure and supply systems; and conduct and participate in state and regional energy emergency exercises to evaluate the effectiveness of their energy assurance plans. The awards for energy assurance capabilities also help states address cyber security concerns and prepare for the challenges of integrating smart grid

427

Dosimetric comparison of treatment plans based on free breathing, maximum, and average intensity projection CTs for lung cancer SBRT  

SciTech Connect

Purpose: To determine whether there is a CT dataset may be more favorable for planning and dose calculation by comparing dosimetric characteristics between treatment plans calculated using free breathing (FB), maximum and average intensity projection (MIP and AIP, respectively) CTs for lung cancer patients receiving stereotactic body radiation therapy (SBRT). Methods: Twenty lung cancer SBRT patients, treated on a linac with 2.5 mm width multileaf-collimator (MLC), were analyzed retrospectively. Both FB helical and four-dimensional CT scans were acquired for each patient. Internal target volume (ITV) was delineated based on MIP CTs and modified based on both ten-phase datasets and FB CTs. Planning target volume (PTV) was then determined by adding additional setup margin to ITV. The PTVs and beams in the optimized treatment plan based on FB CTs were copied to MIP and AIP CTs, with the same isocenters, MLC patterns and monitor units. Mean effective depth (MED) of beams, and some dosimetric parameters for both PTVs and most important organ at risk (OAR), lung minus PTV, were compared between any two datasets using two-tail paired t test. Results: The MEDs in FB and AIP plans were similar but significantly smaller (Ps < 0.001) than that in MIP plans. Minimum dose, mean dose, dose covering at least 90% and 95% of PTVs in MIP plans were slightly higher than two other plans (Ps < 0.008). The absolute volume of lung minus PTV receiving greater than 5, 10, and 20 Gy in MIP plans were significantly smaller than those in both FB and AIP plans (Ps < 0.008). Conformity index for FB plans showed a small but statistically significantly higher. Conclusions: Dosimetric characteristics of AIP plans are similar to those of FB plans. Slightly better target volume coverage and significantly lower low-dose region ({<=}30 Gy) in lung was observed in MIP plans. The decrease in low-dose region in lung was mainly caused by the change of lung volume contoured on two datasets rather than the differences of dose distribution between AIP and MIP plans. Compare with AIP datasets, FB datasets were more prone to significant image artifacts and MIP datasets may overestimate or underestimate the target volume when the target is closer to the denser tissue, so AIP seems favorable for planning and dose calculation for lung SBRT.

Tian Yuan; Wang Zhiheng; Ge Hong; Zhang Tian; Cai Jing; Kelsey, Christopher; Yoo, David; Yin Fangfang [Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States) and Department of Radiation Oncology, Cancer Institute and Hospital, Chinese Academy of Medical Science, Beijing 100021 (China); Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States); Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 and Department of Radiation Oncology, Henan Cancer Hospital, Zhengzhou, Henan 450008 (China); Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)

2012-05-15T23:59:59.000Z

428

Quality Assurance Exchange, Winter 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

new year brings new challenges new year brings new challenges for DOE and the Office of Environmental Management (EM) is no exception, especially with the acceleration and revamping of projects due to the American Recovery and Reinvestment Act (ARRA). A recent reorganization which has restructured EM senior leadership by adding new positions and changing reporting lines for many EM offices has brought about new objectives and challenges. In an effort to understand these changes and expectations, we spoke with Robert Murray, Acting Director of the Office of Standards and Quality Assurance (EM-23) within the Office of Safety and Security Program. In the following interview, Mr. Murray discusses the changes, challenges, and objectives for EM-23 in FY 2010. (Continued on page 2)

429

FAQS Job Task Analyses - Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ~ 1 ~ Job Analysis Worksheet for Quality Assurance Functional Area Qualification Task Source Importance Frequency a. Serve as or support the senior manager responsible for developing the organization's QA Program (QAP) consistent with the DOE QA Order, 414.1A and other customer requirements. Duties and Responsibilities 5 1 b. Review and evaluate the organization's and the contractor's QAP, plans, and processes to verify compliance with applicable regulations, standards, and DOE Orders. Duties and Responsibilities 4 2 c. Monitor and evaluate DOE and contractor implementation of QAPs, plans, and processes to verify adequacy, effectiveness, and compliance with applicable regulations, standards, and DOE Orders, including the evaluation of QA related award fee and

430

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The ``Proposal for Reporting Conduct of Operations & Quality Assurance Compliance to DOE`` describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

431

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The Proposal for Reporting Conduct of Operations Quality Assurance Compliance to DOE'' describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

432

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314 [CANCELLED  

SciTech Connect

The W-314 configuration management (CM) plan describes the systems, processes and procedures for implementing CM.

MCGREW, D.L.

2001-01-12T23:59:59.000Z

433

Quality assurance and data management  

SciTech Connect

This report contains graphs and tables relating to quality assurance and data management for environmental quality at Hanford Reservation.

Lockrem, L.L.

1998-01-12T23:59:59.000Z

434

Information Assurance and Cybersecurity Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fred Terry Topics * Information Assurance (IA) and Cybersecurity * Reference Architecture * Phase 1 Network * Phase 2 Network * Lessons Learned * Challenges * Questions ...

435

Assurance-oriented activity recognition  

Science Journals Connector (OSTI)

Activity recognition (AR) research promises to enable a multitude of human-centric applications in smart environments. Nevertheless, application developers will require assurance mechanisms before they can confidently use and apply AR in real-world pervasive ... Keywords: activity assurance, activity effect, activity effect knowledge base, activity recognition, activity verification, recognition assurances, situation

Eunju Kim; Sumi Helal; Chris Nugent; Jae Woong Lee

2011-09-01T23:59:59.000Z

436

Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396  

SciTech Connect

The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near-term programmatic decisions affect life cycle costs and commitments. (authors)

Dunford, Gary [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States)] [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States); Williams, David [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States)] [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States); Smith, Rick [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)] [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)

2013-07-01T23:59:59.000Z

437

Tank Waste System Integrated Project Team  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decisional Draft Decisional Draft 1 This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations, while also assuring that essential functions necessary to protect human health, the environment and national security are maintained. Tank Waste System Tank Waste System Integrated Project Team Integrated Project Team Steve Schneider Office of Engineering and Technology Tank Waste Corporate Board July 29, 2009 2 This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations, while also assuring that essential functions necessary

438

Delivery quality assurance with ArcCHECK  

SciTech Connect

Radiation therapy requires delivery quality assurance (DQA) to ensure that treatment is accurate and closely follows the plan. We report our experience with the ArcCHECK phantom and investigate its potential optimization for the DQA process. One-hundred seventy DQA plans from 84 patients were studied. Plans were classified into 2 groups: those with the target situated on the diodes of the ArcCHECK (D plans) and those with the target situated at the center (C plans). Gamma pass rates for 8 target sites were examined. The parameters used to analyze the data included 3%/3 mm with the Van Dyk percent difference criteria (VD) on, 3%/3 mm with the VD off, 2%/2 mm with the VD on, and x/3 mm with the VD on and the percentage dosimetric agreement x for diode plans adjusted. D plans typically displayed maximum planned dose (MPD) on the cylindrical surface containing ArcCHECK diodes than center plans, resulting in inflated gamma pass rates. When this was taken into account by adjusting the percentage dosimetric agreement, C plans outperformed D plans by an average of 3.5%. ArcCHECK can streamline the DQA process, consuming less time and resources than radiographic films. It is unnecessary to generate 2 DQA plans for each patient; a single center plan will suffice. Six of 8 target sites consistently displayed pass rates well within our acceptance criteria; the lesser performance of head and neck and spinal sites can be attributed to marginally lower doses and increased high gradient of plans.

Neilson, Christopher; Klein, Michael; Barnett, Rob [London Regional Cancer Program, London Health Sciences Centre, London, Ontario (Canada); Yartsev, Slav, E-mail: slav.yartsev@lhsc.on.ca [London Regional Cancer Program, London Health Sciences Centre, London, Ontario (Canada)

2013-04-01T23:59:59.000Z

439

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

440

Quality Assurance: Quality Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Policy It is the policy of the Department of Energy to establish quality requirements to ensure that risks and environmental impacts are minimized and that safety, reliability, and performance are maximized through the application of effective management systems commensurate with the risks posed by the facility or activity and its work. The Department implements this policy through the QA Order and the QA rule directives to ensure quality assurance requirements are clearly specified for the broad spectrum of work performed by DOE and its contractors. Objective The objective of the QA requirements are to establish an effective management system (i.e., quality assurance programs) using the performance requirements coupled technical standards where appropriate that ensure:

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CRAD, Quality Assurance - Idaho MF-628 Drum Treatment Facility | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance - Idaho MF-628 Drum Treatment Facility Quality Assurance - Idaho MF-628 Drum Treatment Facility CRAD, Quality Assurance - Idaho MF-628 Drum Treatment Facility May 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a May 2007 readiness assessment of the Quality Assurance Program at the MF-628 Drum Treatment Facility at the Idaho National Laboratory Advanced Mixed Waste Treatment Project. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Quality Assurance - Idaho MF-628 Drum Treatment Facility More Documents & Publications CRAD, Engineering - Idaho MF-628 Drum Treatment Facility

442

Emergency Readiness Assurance Program  

Directives, Delegations, and Requirements

To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

1992-02-27T23:59:59.000Z

443

A Template for a Performance Assurance Plan  

Office of Environmental Management (EM)

- Agency The Agency is responsible for each of the following: 5. Provide for scheduling, shutdown, and visual inspections of affected locations during M&V activities...

444

Quality Assurance Exchange March 2011, Volume 7 Issue 1 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Exchange March 2011, Volume 7 Issue 1 Quality Assurance Exchange March 2011, Volume 7 Issue 1 Quality Assurance Exchange March 2011, Volume 7 Issue 1 Quality Software Development and Success Through Project Management and Six Sigma Background The following article discusses the Idaho National Laboratory's Advanced Mixed Waste Treatment Project (AMWTP) process improvements in facility availability and cost avoidance through an improved software management process. This information is very positive and highlights a Department of Energy (DOE) project that simultaneously improved quality, reduced project costs, and regained schedule. Quality Assurance Exchange March 2011 More Documents & Publications Quality Assurance Exchange August 2011, Volume 7 Issue 2 QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3

445

Projections, politics, and practice in regional planning : a case study of MetroFuture  

E-Print Network (OSTI)

This thesis describes the comprehensive planning effort undertaken by the Metropolitan Area Planning Council in the Boston area. This effort engaged over 4,000 of the area's residents between 2002 and 2009 and produced a ...

Paul, Evan Thomas

2010-01-01T23:59:59.000Z

446

Handbook for Planning and Conducting Charrettes for High-Performance Projects: Second Edition  

SciTech Connect

This handbook furnishes guidance for planning and conducting a high-performance building charrette, sometimes called a "greening charrette."

Lindsay, G.; Todd, J. A.; Hayter, S. J.; Ellis, P. G.

2009-09-01T23:59:59.000Z

447

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

report, Smart Grid Information Assurance and Security Technology Assessment was prepared · Transportation Smart Grid Information Assurance and Security Technology Assessment is the final report for the Smart Grid Information Assurance and Security Technology Assessment project (Contract Number 50008027

448

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

449

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

450

EVLA Memo No. 89 The EVLA Outdoor Antenna Test Range Project  

E-Print Network (OSTI)

extremes. One particular task is to implement a Quality Assurance Program (QA) to monitor the manufacturing. The radiation pattern and VSWR data taken would be the core mechanism of the QA program. The second plan program for testing the numerous antenna feeds that will be fabricated over the duration of the project

Groppi, Christopher

451

2014 Annual Planning Summary for the Office of Advanced Research Projects Agency- Energy  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Advanced Research Energy Projects Agency - Energy.

452

2014 Annual Planning Summary for the Portsmouth/Paducah Project Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Portsmouth/Paducah Project Office.

453

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

454

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

455

Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWO-SPT-2007-00249 LWO-SPT-2007-00249 Rev. 1 Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) For Tank 48H Treatment Project (TTP) November, 2007 Technology Maturation Plan (TMP) Fluidized Bed Steam Reforming (FBSR) Technology for Tank 48H Treatment Project (TTP) LWO-SPT-2007-00249 Rev. 1 DISCLAIMER This report was prepared by Washington Savannah River Company (WSRC) for the United States Department of Energy under Contract No. DEA-AC09-96SR18500 and is an account of work performed under that contract. Neither the United States Department of Energy, nor WSRC, nor any of their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, or product or process

456

Project risk and appeals in U.S. Forest Service planning  

SciTech Connect

The National Environmental Policy Act (NEPA) requires U.S. Forest Service planning processes to be conducted by interdisciplinary teams of resource specialists to analyze and disclose the likely environmental impacts of proposed natural resource management actions on Forest Service lands. Multiple challenges associated with these processes have been a source of frustration for the agency. One of these challenges involves administrative appeals through which public entities can challenge a Forest Service decision following a NEPA process. These appeals instigate an internal review process and can result in an affirmation of the Forest Service decision, a reversal of that decision, or additional work that re-initiates all or part of the NEPA process. We examine the best predictors of appeals and their outcomes on a representative sample of 489 Forest Service NEPA processes that were decided between 2007 and 2009. While certain factors associated with pre-existing social contexts (such as a history of controversy) or pre-determined elements of a proposed action (such as the extraction of forest products) predispose certain processes to a higher risk of appeals, other practices and process-related strategies within the control of the agency also appear to bear meaningful influence on the occurrence of appeals and their outcomes. Appeals and their outcomes were most strongly related to programmatic, structural (turnover of personnel in particular), and relationship risks (both internal and external) within the processes, suggesting the need for greater focus within the agency on cultivating positive internal and external relationships to manage the risk of appeals. -- Highlights: ? We examined appeals and their outcomes on 489 U.S. Forest Service NEPA processes. ? Project type, context, team turnover, and personal relationships predicted appeals. ? External relationship management and staff turnover best predicted appeal outcomes. ? Positive internal and external relationships appear to reduce appeal risks.

Stern, Marc J., E-mail: mjstern@vt.edu [Department of Forest Resources and Environmental Conservation, Virginia Tech, 304 Cheatham Hall (0324), Blacksburg, VA 24061 (United States); Predmore, S. Andrew, E-mail: spred2@uis.edu [Department of Environmental Studies, University of Illinois-Springfield, Public Affairs Center, Room 314, Springfield, IL 62703 (United States); Morse, Wayde C., E-mail: morsewc@auburn.edu [School of Forestry and Wildlife Sciences, Auburn University, 3301 Forestry and Wildlife Bldg., Auburn, AL 36849 (United States); Seesholtz, David N., E-mail: dseesholtz@fs.fed.us [Focused Science Delivery Program, Pacific Northwest Research Station, USDA Forest Service, 1249S Vinnell Way, Suite 200, Boise, ID 83709 (United States)

2013-09-15T23:59:59.000Z

457

Hanford site transuranic waste sampling plan  

SciTech Connect

This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed.

GREAGER, T.M.

1999-05-13T23:59:59.000Z

458

EM Quality Assurance Program (EM-QA-001 Revision 0)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I ~ r h b 1tv2om m ~ e e of Environments1M a ~ f p ~ ~ ! n n t (EM) Snbjeet: E M Quality Asamnee Program (QBP) Policies, Procedures, APPROVED: and Plans Principal Deputy Secretary for Environmental Management 1.0 PURPOSE AND OBJECTIVE The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP). The QAP is the EM management system to ensure we "do work correctly." The QAP meets the requirements of DOE 0 414. IC, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." It is intended that the requirements of DOE 0 414.1C and 10 CFR 830 Subpart A are met by implementing this QAP. The QAP provides EM expectations for implementing quality assurance (QA) across the EM complex. The QAP

459

INL-Site Idaho Completion Project Long Term Stewardship Strategic Plan  

SciTech Connect

This Strategic Plan provides a brief historical overview of ICP long-term stewardship at the INL Site and the major goals and strategies that will drive the continued implementation of long-term stewardship in the future. The specific activities and processes that will be required to implement these goals should be outlined within an implementation plan and within implementing procedures and work plans.

Olaveson, B.

2007-09-17T23:59:59.000Z

460

RPP Computer Automated Surveillance System (CASS) to Tank Monitor and Control System (TMACS) transfer project plan  

SciTech Connect

Management plan to ensure the orderly, systematic transfer of alarms from the retired Computer Automated Surveillance System (CASS) to the Tank Monitor and Control System (TMACS).

SHIPLER, C.E.

1999-07-13T23:59:59.000Z

Note: This page contains sample records for the topic "assurance project plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

International Quality Assurance Standards (Presentation)  

SciTech Connect

Tests to make quantitative predictions about photovoltaic (PV) modules are needed. This presentation proposes the creation of international quality assurance standards for PV modules.

Kurtz, S.; Hacke, P.; Wohlgemuth, J.; Kempe, M.; Yamamichi, M.

2011-02-01T23:59:59.000Z

462

Power Assure | Open Energy Information  

Open Energy Info (EERE)

focused on energy efficiency in data centers. The company manages both IT and mechanical electrical load to match IT demand. References: Power Assure1 This article is a...

463

Quality Assurance Exchange August 2011  

Office of Environmental Management (EM)

Editor: Debbie Rosano: 301-903-8177, debbie.rosano@hq.doe.gov Quality Assurance Web site: www.hss.energy.govnuclearsafetyqa Questions or Comments? Please submit to...

464

Waste management project fiscal year 1998 multi-year work plan WBS 1.2  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

Slaybaugh, R.R.

1997-08-29T23:59:59.000Z

465

Title of Project: Systemwide Information for Transportation Assessment: Economic Impacts and ITS Deployment Planning  

E-Print Network (OSTI)

in the Northeastern Illinois area are to improve safety, improve service level (efficiency), reduce energy Deployment Planning Sponsors: Illinois Department of Transportation (IDOT) and Federal Highway Administration plans with a complete economic impact. Using this tool, the six-county Northeastern Illinois region

Illinois at Chicago, University of