Powered by Deep Web Technologies
Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Quality Assurance Program Plan  

Broader source: Energy.gov [DOE]

The achievement of quality in LM activities and products requires implementation of a formal Quality Assurance (QA) Program. This program establishes principles, requirements, practices, and...

2

Performance assurance program plan  

SciTech Connect (OSTI)

B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

Rogers, B.H.

1997-11-06T23:59:59.000Z

3

Quality Assurance Program Plan for FFTF effluent controls. Revision 1  

SciTech Connect (OSTI)

This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

Seamans, J.A.

1995-06-08T23:59:59.000Z

4

Transuranic Waste Characterization Quality Assurance Program Plan  

SciTech Connect (OSTI)

This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

NONE

1995-04-30T23:59:59.000Z

5

Operating and Assurance Program Plan. Revision 4  

SciTech Connect (OSTI)

The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

Not Available

1994-07-01T23:59:59.000Z

6

ERD UMTRA Project quality assurance program plan, Revision 7  

SciTech Connect (OSTI)

This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

NONE

1995-09-01T23:59:59.000Z

7

Plutonium stabilization and handling quality assurance program plan  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM.

Weiss, E.V.

1998-04-22T23:59:59.000Z

8

UMTRA Project Office quality assurance program plan. Revision 6  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

Not Available

1994-09-01T23:59:59.000Z

9

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

10

National Ignition Facility Quality Assurance Program Plan. Revision 1  

SciTech Connect (OSTI)

The National Ignition Facility (NIF) is a key constituent of the Department of Energy`s Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets, and will perform weapons physics and high-energy- density experiments in support of national security and civilian objectives. The NIF Project is a national facility involving the collaboration of several DOE laboratories and subcontractors, including Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), and the University of Rochester Laboratory for Laser Energetics (UR/LLE). The primary mission of the NIF Project is the construction and start-up operation of laser-based facilities that will demonstrate fusion ignition in the laboratory to provide nuclear-weapons-related physics data, and secondarily, to propagate fusion burn aimed at developing a potential source of civilian energy. To support the accomplishment of this very important mission, the LLNL Laser Directorate created the NIF Project Office to organize and bring about the Project. The NIF Project Office has established this Quality Assurance Program to ensure its success. This issue of the Quality Assurance Program Plan (QAPP) adds the requirements for the conduct of Title 11 design, construction, procurement, and Title III engineering. This QAPP defines and describes the program-the management system-for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of the Laboratory and the Laser Directorate.

Wolfe, C.R.; Yatabe, J.

1996-09-01T23:59:59.000Z

11

Management and overview Quality Assurance Program Plan. Revision 2  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

Not Available

1986-08-01T23:59:59.000Z

12

UMTRA Project Office Quality Assurance Program Plan. Revision 5  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

Not Available

1993-11-01T23:59:59.000Z

13

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect (OSTI)

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

14

Westinghouse Hanford Company quality assurance program and implementation plan  

SciTech Connect (OSTI)

This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time periodthrough March 1996, to implement the actions. The costs were allassociated with the actions on training ($300K) and configurationmanagement, design bases, and drawings ($1.4M). Schedulardetails and compensatory measures for the action items areprovided in Appendices A and D to this document.

Moss, S.S., Westinghouse Hanford

1996-07-01T23:59:59.000Z

15

Quality Assurance Program Plan for AGR Fuel Development and Qualification Program  

SciTech Connect (OSTI)

Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

W. Ken Sowder

2004-02-01T23:59:59.000Z

16

Quality Assurance (QA) Program Plan Conceptual Design Phase of Project W-521 Waste Feed Delivery Systems [SUPERSEDED BY RPP-6649 Rev. 0  

SciTech Connect (OSTI)

The Quality Assurance Program Plan (QAPP) describes the quality assurance implementation strategy for Project W-521 during conceptual design.

WHITE, K.A.

2000-08-02T23:59:59.000Z

17

Waste Encapsulation and Storage Facility (WESF) Quality Assurance Program Plan (QAPP)  

SciTech Connect (OSTI)

This Quality Assurance Plan describes how the Waste Encapsulation and Storage Facility (WESF) implements the quality assurance (QA) requirements of the Quality Assurance Program Description (QAPD) (HNF-Mp-599) for Project Hanford activities and products. This QAPP also describes the organizational structure necessary to successfully implement the program. The QAPP provides a road map of applicable Project Hanford Management System Procedures, and facility specific procedures, that may be utilized by WESF to implement the requirements of the QAPD.

ROBINSON, P.A.

2000-04-17T23:59:59.000Z

18

Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)  

SciTech Connect (OSTI)

This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

Tanke, J.M.

1997-05-16T23:59:59.000Z

19

Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program  

SciTech Connect (OSTI)

The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

Carlsbad Field Office

2002-03-01T23:59:59.000Z

20

Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) is organized to address WHC`s implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE.

Carpenter, C.A.

1995-03-02T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

22

Quality Assurance Program Plan for the Waste Sampling and Characterization Facility  

SciTech Connect (OSTI)

The objective of this Quality Assurance Plan is to provide quality assurance (QA) guidance, implementation of regulatory QA requirements, and quality control (QC) specifications for analytical service. This document follows the Department of Energy (DOE)-issued Hanford Analytical Services Quality Assurance Plan (HASQAP) and additional federal [10 US Code of Federal Regulations (CFR) 830.120] QA requirements that HASQAP does not cover. This document describes how the laboratory implements QA requirements to meet the federal or state requirements, provides what are the default QC specifications, and/or identifies the procedural information that governs how the laboratory operates. In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. This document also covers QA elements that are required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAPPs), (QAMS-004), and Interim Guidelines and Specifications for Preparing Quality Assurance Product Plans (QAMS-005) from the Environmental Protection Agency (EPA). A QA Index is provided in the Appendix A.

Grabbe, R.R.

1995-03-02T23:59:59.000Z

23

E-Print Network 3.0 - assurance program plan Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

, and early adoption. SOURCES Although we knew of no existing graduate degree programs in software assurance... for graduates of a software assurance program ... Source:...

24

Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

Holland, Robert C.

2005-09-01T23:59:59.000Z

25

Project Hanford management contract quality assurance program implementation plan for nuclear facilities  

SciTech Connect (OSTI)

During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

Bibb, E.K.

1997-10-15T23:59:59.000Z

26

Summary report on the Solar Consumer Assurance Network (SOLCAN) Program Planning Task in the southern region  

SciTech Connect (OSTI)

The goal of the SOLCAN Program Planning Task is to assist in the development, at the state and local levels, of consumer assurance approaches that will support the accelerated adoption and effective use of new products promoted by government incentives to consumers to meet our nation's energy needs. The task includes state-conducted evaluations and state SOLCAN meetings to identify consumer assurance mechanisms, assess their effectiveness, and identify and describe alternative means for strengthening consumer and industry assurance in each state. Results of the SOLCAN process are presented, including: a Solar Consumer Protection State Assessment Guide; State Solar Consumer Assurance Resources for Selected States; State Solar Consumer Protection Assessment Interviews for Florida; and state SOLCAN meeting summaries and participants. (LEW)

Browne, M. B. [comp.] [comp.

1981-03-15T23:59:59.000Z

27

Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator Programs  

SciTech Connect (OSTI)

The purpose of this document is to serve as the Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator (HS/RTG) programs performed at EG&G Mound Applied Technologies. As such, it identifies and describes the systems and activities in place to support the requirements contained in DOE Order 5700.6C as reflected in MD-10334, Mound Quality Policy and Responsibilities and the DOE/RPSD supplement, OSA/PQAR-1, Programmatic Quality Assurance Requirements for Space and Terrestrial Nuclear Power Systems. Unique program requirements, including additions, modifications, and exceptions to these quality requirements, are contained in the appendices of this plan. Additional appendices will be added as new programs and activities are added to Mound's HS/RTG mission assignment.

Gabriel, D. M.; Miller, G. D.; Bohne, W. A.

1995-03-16T23:59:59.000Z

28

Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

Not Available

1986-08-01T23:59:59.000Z

29

Waste Management Quality Assurance Plan  

SciTech Connect (OSTI)

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

30

[Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

Not Available

1992-06-01T23:59:59.000Z

31

[Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

Not Available

1992-06-01T23:59:59.000Z

32

Quality assurance of HDR prostate plans: Program implementation at a community hospital  

SciTech Connect (OSTI)

Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

Rush, Jennifer B. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States); Thomas, Michael D. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States)]. E-mail: mthomas@hprhs.com

2005-01-01T23:59:59.000Z

33

Quality Assurance Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.4-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

2011-08-16T23:59:59.000Z

34

Quality Assurance Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The directive provides guidance for DOE elements and contractors in developing and implementing an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Superseded by Admin Chg 1, 9-27-11.

2011-08-16T23:59:59.000Z

35

Quality Assurance Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

2011-08-16T23:59:59.000Z

36

Emergency Readiness Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

1992-02-27T23:59:59.000Z

37

Quality Assurance for Residential Retrofit Programs | Department...  

Broader source: Energy.gov (indexed) [DOE]

Quality Assurance for Residential Retrofit Programs Quality Assurance for Residential Retrofit Programs Blue version of the EERE PowerPoint template, for use with PowerPoint 2007....

38

The ARRA EAP Energy Assurance Planning Bulletin  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Standards Energy Assurance Success Stories Heber Light & Power Takes Lead on Local EA Planning Upcoming Events NASEONARUC Environmental Protection & Clean, Reliable...

39

The ARRA EAP Energy Assurance Planning Bulletin  

Broader source: Energy.gov (indexed) [DOE]

of State EA Plans Exercise and Reporting Deadlines Energy Assurance Success Stories West Virginia News from the States California is Top Renewable State Upcoming Events NMU...

40

222-S Laboratory Quality Assurance Plan. Revision 1  

SciTech Connect (OSTI)

This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.

Meznarich, H.K.

1995-07-31T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

Albert editor, R.

2009-01-01T23:59:59.000Z

42

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect (OSTI)

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

43

NMMSS Software Quality Assurance Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Quality Assurance Plan The Software Quality Assurance Plan (SQAP) for the Nuclear Materials Management and Safeguard System (NMMSS) software upgrade project (an actual DOE...

44

Designing and Implementing Effective Performance Assurance Plans  

Broader source: Energy.gov [DOE]

Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting— covers performance assurance planning and process, including performance-based contracts, and measurement and verification protocols.

45

NIF Projects Controls and Information Systems Software Quality Assurance Plan  

SciTech Connect (OSTI)

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

Fishler, B

2011-03-18T23:59:59.000Z

46

Emergency Readiness Assurance Plans (ERAPs)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

47

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

48

The Groundwater Performance Assessment Project Quality Assurance Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Luttrell, Stuart P.

2006-05-11T23:59:59.000Z

49

Legacy Management CERCLA Sites. Quality Assurance Project Plan  

SciTech Connect (OSTI)

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

None

2007-05-03T23:59:59.000Z

50

UMTRA project technical assistance contractor quality assurance implementation plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

Not Available

1994-03-01T23:59:59.000Z

51

SAPHIRE 8 Software Quality Assurance Plan  

SciTech Connect (OSTI)

This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

Curtis Smith

2010-02-01T23:59:59.000Z

52

Large hadron collider (LHC) project quality assurance plan  

SciTech Connect (OSTI)

The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

2002-09-30T23:59:59.000Z

53

QA program plan plutonium stabilization and handling project W-460  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

SCHULTZ, J.W.

1999-09-02T23:59:59.000Z

54

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

Irene Farnham

2011-05-01T23:59:59.000Z

55

Plutonium Immobilization Project, Project Office Quality Assurance Program Description Revision 1  

SciTech Connect (OSTI)

''The quality assurance activity involves the establishment and implementation of the Quality Assurance Program and the development of a Quality Assurance Plan and Procedures. Quality Assurance provides the plans, procedures and controls that are required for repository acceptance and the immobilization plant licensing and design activities.'' The Plutonium Immobilization Project (PIP) has a policy that all development, testing and operational activities be planned and performed in accordance with its customer's needs and expectations, and with a commitment to excellence and continuous improvement. The Immobilization Development and Testing (D&T) Quality Assurance Program establishes implementation requirements which, when completed, will ensure that the program development and test activities conform to the appropriate QA requirements. In order for the program to be effective, a designated quality lead must be in place at the Project Office and each participating site.

Kan, T.

1998-04-30T23:59:59.000Z

56

Software Quality Assurance Plan for GoldSim Models Supporting the Area 3 and Area 5 Radioactive Waste Management Sites Performance Assessment Program  

SciTech Connect (OSTI)

This Software Quality Assurance Plan (SQAP) applies to the development and maintenance of GoldSim models supporting the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) performance assessments (PAs) and composite analyses (CAs). Two PA models have been approved by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as of November 2006 for the PA maintenance work undertaken by National Security Technologies, LLC (NSTec). NNSA/NSO asked NSTec to assume the custodianship of the models for future development and maintenance. The models were initially developed by Neptune and Company (N&C).

Gregory J. Shott, Vefa Yucel

2007-01-03T23:59:59.000Z

57

assurance plan revision: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

assurance plan revision First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 QUALITY ASSURANCE MANUAL...

58

2012 National Energy Assurance Planning Conference After-Action...  

Broader source: Energy.gov (indexed) [DOE]

2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S....

59

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

60

Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan  

SciTech Connect (OSTI)

A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

Stringfellow, William T.

2005-05-13T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Fix, N. J.

2007-01-10T23:59:59.000Z

62

The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

Fix, N. J.

2008-03-12T23:59:59.000Z

63

Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1  

SciTech Connect (OSTI)

This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

NONE

1997-04-14T23:59:59.000Z

64

UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

Not Available

1994-09-01T23:59:59.000Z

65

E-Print Network 3.0 - assurance plan project Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for NRDA followed standard operating procedure (SOP), water sampling plans, Summary: procedures, and NOAA's Analytical Quality Assurance Project Plan (QAPP). Samples were sent...

66

Security and Emergency Management Independent Oversight and Performance Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

2000-03-01T23:59:59.000Z

67

Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents.

HALL, L.R.

2000-02-01T23:59:59.000Z

68

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

69

External Quality Assurance Services (EQAS) Ethanol/Ammonia Program  

E-Print Network [OSTI]

External Quality Assurance Services (EQAS) Ethanol/Ammonia Program BC35 12 x 3 mL 2 Analytes QC35 12 x 3 mL Specimen Only ENGLISH INTENDED USE Bio-Rad EQAS Ethanol/Ammonia Program is designed

Rodriguez, Carlos

70

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

71

Now Available: July 2011 issue of the Energy Assurance Planning Bulletin  

Broader source: Energy.gov [DOE]

This quarter's issue of the Energy Assurance Planning Bulletin highlights upcoming DOE/OE Regional Exercises, Recipient Action Items, and success stories.

72

Quality Assurance Exchange, December 2005  

Broader source: Energy.gov (indexed) [DOE]

the EM-HQ Quality Assur- ance Program Plan (QAPP), the benefits of having a DOE Order on QA, and the EM Quality Assurance goals. Describe your role as QA Administrator for...

73

The Groundwater Performance Assessment Project Quality Assurance Plan  

SciTech Connect (OSTI)

This document provides the quality assurance guidelines that will be followed by the groundwater project.

Walker, Thomas G.

2005-01-26T23:59:59.000Z

74

Implementation of an Integrated Quality Assurance Program for a CT-TPS Process.  

E-Print Network [OSTI]

??Systematic constancy and accuracy of a treatment planning system (TPS) are crucial for the entire radiation treatment planning process (TPP). The Quality Assurance (QA) of… (more)

Wu, Junqing

2002-01-01T23:59:59.000Z

75

Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Canceled by DOE O 5700.6A, dated 7-21-1981.

1981-01-16T23:59:59.000Z

76

Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Cancels DOE O 5700.6, dated 1-16-1981. Canceled by DOE O 5700.6B, dated 9-23-1986.

1981-07-21T23:59:59.000Z

77

Quality Assurance Project Plan for radioactive airborne emissions data compilation and reporting  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for compiling data from radioactie aiborne emissions. These data will be reported to the US Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Hanford Site radioactive airborne emissions are reported to the US Environmental Protection Agency in compliance with Title 40, Protection of the Environment, Code of Federal Regulations, Part 61, ``National Emissions Standards for Hazardous Air Pollutants , ``Subpart H, ``National Emissions Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities`` (EPA 1989a). Reporting to US Department of Energy is performed in compliance with requirements of US Department of Energy Order 5400.1, General Environmental Protection Program (DOE 1988a).

Burris, S.A.; Thomas, S.P.

1994-02-01T23:59:59.000Z

78

Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological  

E-Print Network [OSTI]

.....................................................................................................................................................1 Transition to Electronic Data ManagementQuality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey

79

UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2  

SciTech Connect (OSTI)

This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

NONE

1995-11-01T23:59:59.000Z

80

Independent Oversight and Performance Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Independent Oversight Program is designed to enhance the DOE safeguards and security; cyber security; emergency management; and environment, safety, and health programs by providing DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the adequacy of DOE policy and the effectiveness of line management performance in safeguards and security; cyber security; emergency management; environment, safety, and health; and other critical functions as directed by the Secretary. Cancels DOE O 470.2A and Attachment 2 of DOE O 414.1A. Canceled by DOE O 227.1.

2002-10-31T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Plutonium immobilization project development and testing quality assurance program description - February 1999  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work.

MacLean, L M; Ziemba, J

1999-02-01T23:59:59.000Z

82

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

83

Quality assurance (QA) plan for the transportation and receipt of transuranic (TRU) waste  

SciTech Connect (OSTI)

The Department of Energy (DOE) Albuquerque Operations (AL) Office of Projects and Energy Programs has been assigned the responsibility for administration of the disposal of Contact-Handled (CH) Transuranic (TRU) contaminated material (waste) from generator/storage sites of the United States defense programs that are operated by the DOE. This responsibility encompasses all activities associated with the certification of TRU waste and the transportation, receipt and disposal of that waste at the Waste Isolation Pilot Plant (WIPP). The WIPP is located near Carlsbad, New Mexico and is being developed under the management of the DOE WIPP Project Office (WPO). The DOE/WPO is a branch of the DOE/AL and has been delegated overall responsibility for all aspects of the WIPP program. This report describes the quality assurance plan for the TRU waste transportation and receipt of waste.

Not Available

1990-02-01T23:59:59.000Z

84

Global Threat Reduction Initiative Fuel-Thermo-Physical Characterization Project Quality Assurance Plan  

SciTech Connect (OSTI)

The charter of the Fuel Thermo-Physical Characterization Project is to ready Pacific Northwest National Laboratory (PNNL) facilities and processes for the receipt of unirradiated and irradiated low enriched uranium (LEU) molybdenum (U-Mo) fuel element samples, and to perform analysis to support the Global Threat Reduction Initiative conversion program. PNNL’s support for the program will include the establishment of post-irradiation examination processes, including thermo-physical properties, unique to the U.S. Department of Energy laboratories. These processes will ultimately support the submission of the base fuel qualification (BFQ) to the U.S. Nuclear Regulatory Commission (NRC) and revisions to High Performance Research Reactor Safety Analysis Reports to enable conversion from highly enriched uranium to LEU fuel. This quality assurance plan (QAP) provides the quality assurance requirements and processes that support the NRC BFQ. This QAP is designed to be used by project staff, and prescribes the required management control elements that are to be met and how they are implemented. Additional controls are captured in Fuel Thermo-Physical Characterization Project plans, existing procedures, and procedures to be developed that provide supplemental information on how work is conducted on the project.

Pereira, Mario M.; Slonecker, Bruce D.

2012-06-01T23:59:59.000Z

85

Proposed New Program: Planning New Programs  

E-Print Network [OSTI]

Proposed New Program: Planning New Programs Planning Program As outlined in the attached document, the Human Geography group is bringing forward a proposal for a new undergraduate program in Planning. The Curriculum Committee has discussed this program both last year, and in our Friday the 13th

Machel, Hans

86

Quality Assurance Program Application for the Component Test Capability  

SciTech Connect (OSTI)

This paper documents the application of quality requirements to Component Test Capability (CTC) Project activities for each CTC alternative. Four alternatives are considered for quality program application: do nothing, vendor testing, existing testing facility modification, and Component Test Facility. It also describes the advantages and disadvantages of using the existing Next Generation Nuclear Plant Quality Program Plan with CTC modifications versus a stand-alone CTC Quality Program Plan.

Stephanin L. Austad

2009-06-01T23:59:59.000Z

87

Master Pump Shutdown MPS Software Quality Assurance Plan (SQAP)  

SciTech Connect (OSTI)

The MPSS Software Quality Assurance (SQAP) describes the tools and strategy used in the development of the MPSS software. The document also describes the methodology for controlling and managing changes to the software.

BEVINS, R.R.

2000-09-20T23:59:59.000Z

88

E-Print Network 3.0 - assurance program argonne Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

argonne Search Powered by Explorit Topic List Advanced Search Sample search results for: assurance program argonne Page: << < 1 2 3 4 5 > >> 1 Summary Site Environmental Report for...

89

E-Print Network 3.0 - assurance program guidelines Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grants Administration Summary: and interpretation of PHS Policy, supports educational programs, and monitors compliance with the Policy by Assured... guidelines for research funded...

90

E-Print Network 3.0 - assurance testing program Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Sample search results for: assurance testing program Page: << < 1 2 3 4 5 > >> 1 CSP 587: Software Quality Management S. Kan, Software Quality engineering, Addison-Wesley....

91

ESnet Program Plan 1994  

SciTech Connect (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

92

The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan  

SciTech Connect (OSTI)

The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

Fix, N. J.

2008-02-11T23:59:59.000Z

93

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect (OSTI)

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

94

Quality Assurance of ARM Program Climate Research Facility Data  

SciTech Connect (OSTI)

This report documents key aspects of the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) data quality assurance program as it existed in 2008. The performance of ACRF instruments, sites, and data systems is measured in terms of the availability, usability, and accessibility of the data to a user. First, the data must be available to users; that is, the data must be collected by instrument systems, processed, and delivered to a central repository in a timely manner. Second, the data must be usable; that is, the data must be inspected and deemed of sufficient quality for scientific research purposes, and data users must be able to readily tell where there are known problems in the data. Finally, the data must be accessible; that is, data users must be able to easily find, obtain, and work with the data from the central repository. The processes described in this report include instrument deployment and calibration; instrument and facility maintenance; data collection and processing infrastructure; data stream inspection and assessment; the roles of value-added data processing and field campaigns in specifying data quality and haracterizing the basic measurement; data archival, display, and distribution; data stream reprocessing; and engineering and operations management processes and procedures. Future directions in ACRF data quality assurance also are presented.

RA Peppler; KE Kehoe; KL Sonntag; CP Bahrmann; SJ Richardson; SW Christensen; RA McCord; DJ Doty; R Wagener; RC Eagan; JC Lijegren; BW Orr; DL Sisterson; TD Halter; NN Keck; CN Long; MC Macduff; JH Mather; RC Perez; JW Voyles; MD Ivey; ST Moore; DL Nitschke; BD Perkins; DD Turner

2008-03-01T23:59:59.000Z

95

2010 Quality Assurance Improvement Project Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement Awardflash2007-42attachment1.pdfmodule 4Department0 Quality Assurance Improvement

96

2012 Quality Assurance Improvement Project Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement Awardflash2007-42attachment1.pdfmodule(EE)2012 Nuclear Energy2012 Quality Assurance

97

Quality assurance management plan (QAPP) special analytical support (SAS)  

SciTech Connect (OSTI)

It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

LOCKREM, L.L.

1999-05-20T23:59:59.000Z

98

UC Assurance Plan For Lawrence Berkeley National Laboratory July 2007  

E-Print Network [OSTI]

has the most effective lockout/tagout program? ” “I’m hereWhy don’t you have a lockout/tagout program? ” “This is an

Chernowski, John

2007-01-01T23:59:59.000Z

99

Risk assessment in the DOE Assurance Program for Remedial Action  

SciTech Connect (OSTI)

This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

1985-08-01T23:59:59.000Z

100

assurance project plans: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and water resources, while supporting the Pecos River Compact by delivering water to Texas 4. Project Objectives: Planning for a possible candidate conservation agreement will...

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

assurance project plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and water resources, while supporting the Pecos River Compact by delivering water to Texas 4. Project Objectives: Planning for a possible candidate conservation agreement will...

102

Recommendations for a Software Quality Assurance Plan for the CMR Facility at LANL  

SciTech Connect (OSTI)

The Nuclear Materials Technology (NMT) organizations 1 and 3 within the Chemical and Metallurgical Research (CMR) facility at the Los Alamos National Laboratory are working to achieve Waste Isolation Pilot Plant (WIPP) certification to enable them to transport their TRU waste to WIPP. This document is intended to provide not only recommendations to address the necessary software quality assurance activities to enable the NMT-1 and NMT-3 organizations to be WIPP compliant but is also meant to provide a template for the final Software Quality Assurance Plan (SQAP). This document specifically addresses software quality assurance for all software used in support of waste characterization and analysis. Since NMT-1 and NMT-3 currently have several operational software products that are used for waste characterization and analysis, these software quality assurance recommendations apply to the operations, maintenance and retirement of the software and the creation and development of any new software required for waste characterization and analyses.

Adams, K.; Matthews, S. D.; McQueen, M. A.

1998-10-01T23:59:59.000Z

103

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

QA Program, the applicable QA requirements, and the responsibility for the implementationQA capability as determined by evaluation of the facilities and implementation of the QA program.QA personnel and having line authority for the implementation of the QA program.

Albert editor, R.

2009-01-01T23:59:59.000Z

104

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

105

UC Assurance Plan For Lawrence Berkeley National Laboratory July2007  

SciTech Connect (OSTI)

This Division ES&H Self-Assessment Manual describes how the Laboratory administers a division self-assessment program that conforms to the institutional requirements promulgated in the 'LBNL Environment, Safety and Health Self-Assessment Program' (LBNL/PUB-5344, latest revision). The institutional program comprises all appraisal and reporting activities that identify environmental, safety, and health deficiencies and associated corrective actions. It is designed to meet U.S. Department of Energy (DOE) requirements for self-assessment. Self-assessment is a continuous process of information gathering and evaluation. A division selfassessment program should describe methods for gathering and documenting information, and methods to analyze these performance data to identify trends and root causes and their corrections.

Chernowski, John

2007-07-09T23:59:59.000Z

106

Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan  

SciTech Connect (OSTI)

This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

Fix, N. J.

2008-03-28T23:59:59.000Z

107

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect (OSTI)

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-03T23:59:59.000Z

108

LDRD FY 2014 Program Plan  

SciTech Connect (OSTI)

As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

Anita Gianotto; Dena Tomchak

2013-08-01T23:59:59.000Z

109

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

110

PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan  

SciTech Connect (OSTI)

In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-02T23:59:59.000Z

111

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Department of Energy's (DOE) Carbon Capture program is conducted under the Clean Coal Research Program (CCRP). DOE's overarching mission is to increase the energy...

112

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Department of Energy's (DOE) Advanced Turbines program is conducted under the Clean Coal Research Program (CCRP). DOE's overarching mission is to increase the energy...

113

Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6  

SciTech Connect (OSTI)

The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

Marsha Keister

2010-04-01T23:59:59.000Z

114

Standard guide for establishing a quality assurance program for uranium conversion facilities  

E-Print Network [OSTI]

1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use. 1.3 The basic elements of a quality assurance program appear in the following order: FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures & Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20 TABLE 1 NQA-1 Basic Requirements Relat...

American Society for Testing and Materials. Philadelphia

2004-01-01T23:59:59.000Z

115

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

116

Quality Assurance Plan for Field Activities at the Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) has established a Natural and Accelerated Bioremediation Research (NABIR) program Field Research Center (FRC) for the U.S. Department of Energy (DOE) Office of Biological and Environmental Research. The FRC is located in Bear Creek Valley within the Y-12 Plant area of responsibility on DOE's Oak Ridge Reservation in Tennessee. The NABIR program is a long-term effort designed to increase the understanding of fundamental biogeochemical processes that would allow the use of bioremediation approaches for cleaning up DOE's contaminated legacy waste sites. The FRC provides a site for investigators in the NABIR program to conduct research and obtain samples related to in situ bioremediation. The FRC is integrated with existing and future laboratory and field research and provides a means of examining the biogeochemical processes that influence bioremediation under controlled small-scale field conditions. This Quality Assurance Plan (QAP) documents the quality assurance protocols for field and laboratory activities performed by the FRC staff. It supplements the requirements in the ORNL Nuclear Quality Assurance Program and the ESD Quality Assurance Program. The QAP addresses the requirements in Title 10 CFR, Part 830 Subpart A, ''Quality Assurance Requirements'', using a graded approach appropriate for Research and Development projects based on guidance from ''Implementation Guide for Quality Assurance Programs for Basic and Applied Research'' (DOE-ER-STD-6001-92). It also supports the NABIR FRC Management Plan (Watson and Quarles 2000a) which outlines the overall procedures, roles and responsibilities for conducting research at the FRC. The QAP summarizes the organization, work activities, and qualify assurance and quality control protocols that will be used to generate scientifically defensible data at the FRC. The QAP pertains to field measurements and sample collection conducted by the FRC to characterize the site and in support of NABIR-funded investigations at the FRC. NABIR investigators who collect their own samples or measurements at the FRC will be responsible for developing their own data quality assurance protocol. Notably, this QAP will be of direct benefit to NABIR investigators who will be provided with and use the documented quality data about the FRC to support their investigations.

Brandt, C.C.

2002-02-28T23:59:59.000Z

117

Municipal Energy Plan Program (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Ontario is supporting local energy planning by introducing the Municipal Energy Plan (MEP) program. The MEP program is designed to help municipalities better understand their local energy needs ...

118

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Broader source: Energy.gov (indexed) [DOE]

PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist The following checklist is intended to provide system owners, project...

119

Monitoring Plan for Weatherization Assistance Program, State...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance...

120

Bonneville Power Administration Program Specific Recovery Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan Microsoft Word - PSRP May 15 2009 BPA Final.docx...

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Used Fuel Disposition Campaign Preliminary Quality Assurance...  

Energy Savers [EERE]

Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary...

122

Planning guidance for the Chemical Stockpile Emergency Preparedness Program  

SciTech Connect (OSTI)

This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

1995-02-01T23:59:59.000Z

123

Configuration Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration...

124

SAPHIRE 8 Software Quality Assurance Oversight  

SciTech Connect (OSTI)

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, 'New Features and Capabilities Overview'.

Kurt G. Vedros

2011-09-01T23:59:59.000Z

125

Assurances - Non-Construction Programs | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccess to OUO Access toEnergy 5 BTOoftheA CaseTechnicalAssurances

126

Site Support Program Plan Infrastructure Program  

SciTech Connect (OSTI)

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

127

QUALITY ASSURANCE PROGRAM 1997 BNL Site Environmental Report 10 -1  

E-Print Network [OSTI]

, and improve implementation of the Division- wide QA program. 10.1 Environmental Surveillance Program The QA- prehensive QA program and are subject to audits by ES&HS Division personnel to ensure its implementation Management (QM) Office, headed by the QM Manager, coordinates and evaluates QA implementation

128

Quality Assurance Program Undergoes Sound Changes to Ensure Safe, Correct Work  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. – Completing the world’s largest nuclear cleanup safely and correctly is EM’s priority. In support of that central mission, EM recently made changes that strengthen its corporate quality assurance program, marking the first revisions to the quality program since EM established it in 2008. The program provides the foundation for achieving quality through a consistent approach to all mission-related work across the EM complex.

129

LDRD Program Plan master  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and6 th7525T3 Document5 Program

130

LDRD Program Plan master  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and6 th7525T3 Document54 Program

131

The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

Fix, N. J.

2009-04-29T23:59:59.000Z

132

Solid Waste Management Program Plan  

SciTech Connect (OSTI)

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

133

Standard guide for establishing a quality assurance program for analytical chemistry laboratories within the nuclear industry  

E-Print Network [OSTI]

1.1 This guide covers the establishment of a quality assurance (QA) program for analytical chemistry laboratories within the nuclear industry. Reference to key elements of ANSI/ISO/ASQC Q9001, Quality Systems, provides guidance to the functional aspects of analytical laboratory operation. When implemented as recommended, the practices presented in this guide will provide a comprehensive QA program for the laboratory. The practices are grouped by functions, which constitute the basic elements of a laboratory QA program. 1.2 The essential, basic elements of a laboratory QA program appear in the following order: Section Organization 5 Quality Assurance Program 6 Training and Qualification 7 Procedures 8 Laboratory Records 9 Control of Records 10 Control of Procurement 11 Control of Measuring Equipment and Materials 12 Control of Measurements 13 Deficiencies and Corrective Actions 14

American Society for Testing and Materials. Philadelphia

2006-01-01T23:59:59.000Z

134

assurance program description: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

workforce at LANL. DataImpacts LANL Funding: These Postdocs are paid from programmatic funding within 2 Program Description Queen's University Computer Technologies and...

135

Program Building Committee's Central Planning Group.  

E-Print Network [OSTI]

Tooe ZTA245.7 8873 Y)O./3~ The Texas A&M (stem r ultural ~ion ~ervrce Damet C Plannstlel. Director College Stallon Program Building Committee's CENTRAL PLANNING GROUP 8-1344 Authors: Burl B. Richardson , Extension Program Specialist... and Mary G. Marshall, Extension Program Specialist Program -Building Committee's CENTRAL PLANNING GROUP This leaflet describes the role of the central planning group in the program development process_ The central planning group is the highest...

Richardson, Burl B.; Marshall, Mary G.

1982-01-01T23:59:59.000Z

136

Civilian radioactive waste management program plan. Revision 2  

SciTech Connect (OSTI)

This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

NONE

1998-07-01T23:59:59.000Z

137

Oil program implementation plan FY 1996--2000  

SciTech Connect (OSTI)

This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

NONE

1995-04-01T23:59:59.000Z

138

Environmental Planning and Ecology Program Annual Report.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2008-01-01T23:59:59.000Z

139

Hazardous Waste Compliance Program Plan  

SciTech Connect (OSTI)

The Hazardous Waste Compliance Program Plan (HWCPP) describes how the Rocky Flats Plant institutes a more effective waste management program designed to achieve and maintain strict adherence to the Resource Conservation and Recovery Act (RCRA) requirements. Emphasis is given to improve integration of line operations with programmatic and functional support activities necessary to achieve physical compliance to RCRA regulated equipment, facilities and operations at the floor level. This program focuses on specific activities occurring or which need to occur within buildings containing RCRA regulated units and activities. The plan describes a new approach to achieving and maintaining compliance. This approach concentrates authority and accountability for compliance with the line operating personnel, with support provided from the programmatic functions. This approach requires a higher degree of integration and coordination between operating and program support organizations. The principal changes in emphases are; (1) increased line operations involvement, knowledge and accountability in compliance activities, (2) improved management systems to identify, correct and/or avoid deficiencies and (3) enhanced management attention and employee awareness of compliance related matters.

Potter, G.L.; Holstein, K.A.

1994-05-01T23:59:59.000Z

140

Sample Lesson Plan Safety and Health Programs 1 Lesson Plan  

E-Print Network [OSTI]

culture that reduces accidents for workers and improves the bottom line for managers. When safetySample Lesson Plan ­ Safety and Health Programs 1 Lesson Plan General Industry Outreach Training Program (10-hour) Topic: Safety and Health Programs Overview Effective management of worker safety

Homes, Christopher C.

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish an effective management system [i.e., quality assurance programs (QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Cancels DOE O 414.1.

1999-09-29T23:59:59.000Z

142

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect (OSTI)

The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

HORHOTA, M.J.

2000-12-21T23:59:59.000Z

143

Pollution prevention program plan 1996  

SciTech Connect (OSTI)

This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE`s commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE`s routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations.

NONE

1996-06-01T23:59:59.000Z

144

Factors affecting binder properties between production and construction and their impact on quality assurance programs  

E-Print Network [OSTI]

FACTORS AFFECTING BINDER PROPERTIES BETWEEN PRODUCTION AND CONSTRUCTION AND THEIR IMPACT ON QUALITY ASSURANCE PROGRAMS A Thesis by EDITH ARAMBULA MERCADO Submitted to the Office of Graduate Studies of Texas A&M University in partial... ARAMBULA MERCADO Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved as to style and content by: Am Epps Martin (Chair of Committee) Roger ith (Member) l'Cl(fford Spiegelman...

Arambula Mercado, Edith

2002-01-01T23:59:59.000Z

145

Quality Assurance of Radiation Therapy Planning Systems: Current Status and Remaining Challenges  

SciTech Connect (OSTI)

Computerized radiation therapy planning systems (RTPSs) are pivotal for treatment planning. The acceptance, commissioning, and quality control of RTPSs are uniquely complex and are described in the American Association of Physicists in Medicine Task Group Report 53 (1998) and International Atomic Energy Agency Technical Report Series No. 430 (2004). The International Atomic Energy Agency also developed a document and data package for use by vendors and purchasers to aid with acceptance testing of RTPSs. This document is based on International Electrotechnical Commission standard 62083 (2000) and describes both 'type' tests to be performed in the factory and 'site' tests to be performed in the clinic. The American Association of Physicists Task Group Report 67 described benchmark tests for the validation of dose calculation algorithms. Test data are being produced with the backing of the U.S. National Cancer Institute. However, significant challenges remain. Technology keeps evolving rapidly, thus requiring new quality assurance (QA) procedures. Intensity-modulated radiation therapy with its use of inverse optimization has added a new dimension to QA, because the results are not intuitively obvious. New technologies such as real-time ultrasound guidance for brachytherapy, TomoTherapy, and Cyberknife, require their own specialized RTPSs with unique QA requirements. On-line imaging allows for the generation of dose reconstructions using image warping techniques to determine the daily dose delivered to the patient. With increasing computer speeds, real-time reoptimization of treatment plans will become a reality. Gating technologies will require four-dimensional dose calculations to determine the actual dose delivered to tissue voxels. With these rapidly changing technologies, it is essential that a strong QA culture is invoked in every institution implementing these procedures and that new protocols are developed as a part of the clinical implementation process.

Van Dyk, Jacob [Department of Physics and Engineering, London Regional Cancer Program/London Health Sciences Centre, London, ON (Canada); Departments of Oncology, Medical Biophysics, Diagnostic Imaging and Nuclear Medicine, and Physics and Astronomy, University of Western Ontario, London, ON (Canada)], E-mail: jake.vandyk@lhsc.on.ca

2008-05-01T23:59:59.000Z

146

California Commissioning Collaborative: 2007 Program Plan  

E-Print Network [OSTI]

California Commissioning Collaborative: 2007 Program Plan Presented by: Jim Parks, Chair CCC Board of Directors November 1, 2007 © California Commissioning Collaborative © California Commissioning Collaborative Mission and Organization • Improve... and RCx as a strategy for meeting efficiency goals • CCC projects provide support and resources © California Commissioning Collaborative 2007 Program Plan • Support for Retrocommissioning Programs – Verification of Savings • Retrocommissioning Market...

Parks, J.

2007-01-01T23:59:59.000Z

147

Planning the Annual 4-H Program  

E-Print Network [OSTI]

A well-planned program gives direction to 4-H throughout the year. Advanced planning outlines each person's responsibilities, allows ample time to prepare, and makes certain all members have a chance to be involved during the year. This publication...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

148

Planning the Annual 4-H Program (Spanish)  

E-Print Network [OSTI]

A well-planned program gives direction to 4-H throughout the year. Advanced planning outlines each person? responsibilities, allows ample time to prepare and makes certain all members have a chance to be involved during the year. This publication...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

149

Planning for Biodiversity Conservation Using Stochastic Programming  

E-Print Network [OSTI]

9 Planning for Biodiversity Conservation Using Stochastic Programming Trevon Fuller,1 David P biodiversity features worldwide have prompted the development of a systematic planning framework biol- ogy, biodiversity. 9.1 Introduction Conservation areas are broadly defined as sites administered

Morton, David

150

E-Print Network 3.0 - assurance implementation plan Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Computer Technologies and Information Sciences 14 Quality system for the educational activities at the University of Oslo (last update 6 July 2010) QUALITY ASSURANCE...

151

Corporate Sustainability Reporting: Investigation of Assurance Process, Assurance Characteristics and Assurance Frameworks Used  

E-Print Network [OSTI]

This dissertation is on assured sustainability reporting. It has three parts that are titled as follows: Part 1. Planning Assurance Services for Sustainability Reporting: An Analysis of Cost versus Assurance in Audit ...

Rao, Sunita

2012-08-31T23:59:59.000Z

152

Microsoft Word - INL MIS-12-25696 Fuels_LWRS_Program_Plan R1...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

QA Quality Assurance QAPD Quality Assurance Program Document R&D Research and Development RIA Reactivity Initiated Accident SAD Selected area diffraction SCC Stress Corrosion...

153

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

154

E-Print Network 3.0 - assurance programs developed Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 hours Software Product vs. Software process Quality Assurance vs. Quality Control Quality... quality assurance, quality measures, and ... Source: Saniie, Jafar - Department of...

155

E-Print Network 3.0 - assurance program description---dwpf Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computer Technologies and Information Sciences 13 Software Assurance During Maintenance Paul E. Black Summary: Software Assurance During Maintenance Paul E. Black U.S....

156

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

2008-08-01T23:59:59.000Z

157

U.S. Department of Energy, Carlsbad Area Office quality assurance program document. Revision 1  

SciTech Connect (OSTI)

Mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of TRU waste, and establishing an effective system for management of TRU waste from generation to disposal. To help in fulfilling this mission and to ensure that risks and environmental impacts are identified and minimized, and that safety, reliability, and performance are optimized, CAO`s policy is to establish and maintain an effective quality assurance (QA) program that supports compliance with applicable Federal, State, and local regulations, and DOE orders and requirements. This document establishes QA program requirements for all programs, projects, and activities sponsored by CAO.

NONE

1996-04-01T23:59:59.000Z

158

Optics and Optical Engineering Program Assessment Plan Program Learning Objectives  

E-Print Network [OSTI]

Optics and Optical Engineering Program Assessment Plan Program Learning, and processes that underlie optics and optical engineering. 2. Strong understanding of the fundamental science, mathematics, and processes that underlie optics and optical

Cantlon, Jessica F.

159

CHEMICAL ENGINEERING PROGRAM ASSESSMENT PLAN Program Learning Objectives  

E-Print Network [OSTI]

education necessary to understand the impact of engineering solutions in a global, economic, environmental20 CHEMICAL ENGINEERING PROGRAM ASSESSMENT PLAN Program Learning Objectives of mathematics, science, and engineering (b) an ability to design and conduct experiments, as well

Cantlon, Jessica F.

160

SMUD's HVAC Programs Ravi Patel-Program Planning  

E-Print Network [OSTI]

1 SMUD's HVAC Programs 5-7-13 Ravi Patel- Program Planning Bruce Baccei- R&D #12;SMUD's Residential contractors trained and BPI certified ­ Majority were pushing only HVAC; now driving the HPP · Program encourages more HVAC replacements to occur through HPP ­ Move away from stand alone programs ­ Start

California at Davis, University of

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

24 Command Fire Improvement Action Program Plan  

SciTech Connect (OSTI)

Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

GRIFFIN, G.B.

2000-12-01T23:59:59.000Z

162

Natural Gas Multi-Year Program Plan  

SciTech Connect (OSTI)

This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

NONE

1997-12-01T23:59:59.000Z

163

Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

Not Available

1993-12-01T23:59:59.000Z

164

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-19T23:59:59.000Z

165

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-13T23:59:59.000Z

166

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes sample gases of volatile organic compounds (VOCs) for analysis. Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2006-04-01T23:59:59.000Z

167

Ground water protection management program plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

168

Integrated Safety Management in QA Program Planning  

Broader source: Energy.gov [DOE]

Presenter: Sonya Barnette, Office of Quality Assurance Policy and Assistance, Office of Nuclear Safety, Quality Assurance and Environment Track 9-8

169

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect (OSTI)

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, S.K.

2002-01-31T23:59:59.000Z

170

Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order  

SciTech Connect (OSTI)

This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

Evans, Susan Kay; Orchard, B. J.

2002-01-01T23:59:59.000Z

171

assessment program plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Biomedical Engineering Program Assessment Plan Program Learning Objectives 1. Students should be able to draw upon basic knowledge knowledge of the basic principles of...

172

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

173

2009 CAPS Spring Forecast Program Plan  

E-Print Network [OSTI]

package. · Two 18 UTC update forecasts on demand basis, with the same domain and configuration, running2009 CAPS Spring Forecast Experiment Program Plan April 20, 2009 #12;2 Table of Content 1. Overview .......................................................................................................4 3. Forecast System Configuration

Droegemeier, Kelvin K.

174

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

175

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect (OSTI)

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-02-01T23:59:59.000Z

176

Specified assurance level sampling procedure  

SciTech Connect (OSTI)

In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

Willner, O.

1980-11-01T23:59:59.000Z

177

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect (OSTI)

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

178

BETO Announces Updated Multi-Year Program Plan: November 2014...  

Broader source: Energy.gov (indexed) [DOE]

update of the MYPP. Addthis Related Articles Update Released to BETO's Multi-Year Program Plan BETO Announces Updated Multi-Year Program Plan DOE Publishes Updated SSL R&D Plan...

179

Applications of program understanding and rule-based quality assurance to Slam II simulation programs.  

E-Print Network [OSTI]

??With the advance of time, our inventory of simulation programs has and continues to accumulate. To maximize the return on our investment of time and… (more)

Wendt, N. Rodney.

2009-01-01T23:59:59.000Z

180

HOSPITAL LAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLAN  

E-Print Network [OSTI]

STANDARDS AND ENERGY CONSERVATION: LAWRENCE A PROGRAM PLANLAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLANLAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLAN

Battles, Donald R.

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Environmental Restoration Program Document Control Plan  

SciTech Connect (OSTI)

This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

Montgomery, L.M.

1993-09-01T23:59:59.000Z

182

TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001  

SciTech Connect (OSTI)

The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

SCHWARTZ,S.E.; LUNN,P.

2001-03-01T23:59:59.000Z

183

Quality Assurance/Quality Control (QA/QC) Summary for the California Rivers and Streams Study  

E-Print Network [OSTI]

APPENDIX 1 Quality Assurance/Quality Control (QA/QC) Summary for the California Rivers and Streams Ambient Monitoring Program (SWAMP) Quality Assurance Program Plan (QAPrP) are outlined in the Rivers QAPP may arise so that corrective actions can be implemented. Quality control samples prepared and analyzed

184

Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish an effective management system [i.e., quality assurance programs(QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Change 1, dated 7/12/01, facilitates the Department's organizational transition necessitated by establishment of the NNSA. (Attachment 2 of this Order is canceled by DOE O 470.2B.) Cancels: DOE O 414.1

2001-07-12T23:59:59.000Z

185

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program  

SciTech Connect (OSTI)

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energy’s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 “Quality Assurance Program” under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as “not applicable” to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

2008-03-07T23:59:59.000Z

186

Program plan for the resolution of tank vapor issues  

SciTech Connect (OSTI)

Since 1987, workers at the Hanford Site waste tank farms in Richland, Washington, have reported strong odors emanating from the large, underground high-level radioactive waste storage tanks. Some of these workers have complained of symptoms (e.g., headaches, nausea) related to the odors. In 1992, the U.S. Department of Energy, which manages the Hanford Site, and Westinghouse Hanford Company determined that the vapor emissions coming from the tanks had not been adequately characterized and represented a potential health risk to workers in the immediate vicinity of the tanks. At that time, workers in certain areas of the tank farms were required to use full-face, supplied-breathing-air masks to reduce their exposure to the fugitive emissions. While use of supplied breathing air reduced the health risks associated with the fugitive emissions, it introduced other health and safety risks (e.g., reduced field of vision, air-line tripping hazards, and heat stress). In 1992, an aggressive program was established to assure proper worker protection while reducing the use of supplied breathing air. This program focuses on characterization of vapors inside the tanks and industrial hygiene monitoring in the tank farms. If chemical filtration systems for mitigation of fugitive emissions are deemed necessary, the program will also oversee their design and installation. This document presents the plans for and approach to resolving the Hanford Site high-level waste tank vapor concerns. It is sponsored by the Department of Energy Office of Environmental Restoration and Waste Management.

Osborne, J.W.; Huckaby, J.L.

1994-05-01T23:59:59.000Z

187

Next Generation Nuclear Plant Methods Technical Program Plan  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2007-01-01T23:59:59.000Z

188

Next Generation Nuclear Plant Methods Technical Program Plan  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-12-01T23:59:59.000Z

189

Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-09-01T23:59:59.000Z

190

Fermilab | Directorate | Program Planning Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility ofSmall15.000 Rev. 0JosephOrganizationOfficesProgram

191

Program Plans | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sofAppendix B, September 2010Program Overview

192

Lightweight materials for transportation: Program plan  

SciTech Connect (OSTI)

This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

Not Available

1993-07-01T23:59:59.000Z

193

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

194

Planning for Biodiversity Conservation Using Stochastic Programming  

E-Print Network [OSTI]

9 Planning for Biodiversity Conservation Using Stochastic Programming Trevon Fuller,1 David P biol- ogy, biodiversity. 9.1 Introduction Conservation areas are broadly defined as sites administered for the protection of threatened species and other features of biodiversity. However, many conservation ar- eas

Sarkar, Sahotra

195

Egypt's population policies and family planning program: a critical examination.  

E-Print Network [OSTI]

??Egypt's national family planning program, in existence since 1965, has been fairly successful in increasing the use of family planning methods and lowering the population… (more)

Carr, Aline B.

2012-01-01T23:59:59.000Z

196

A Comprehensive Quality Assurance Program for Personnel and Procedures in Radiation Oncology: Value of Voluntary Error Reporting and Checklists  

SciTech Connect (OSTI)

Purpose: This report describes the value of a voluntary error reporting system and the impact of a series of quality assurance (QA) measures including checklists and timeouts on reported error rates in patients receiving radiation therapy. Methods and Materials: A voluntary error reporting system was instituted with the goal of recording errors, analyzing their clinical impact, and guiding the implementation of targeted QA measures. In response to errors committed in relation to treatment of the wrong patient, wrong treatment site, and wrong dose, a novel initiative involving the use of checklists and timeouts for all staff was implemented. The impact of these and other QA initiatives was analyzed. Results: From 2001 to 2011, a total of 256 errors in 139 patients after 284,810 external radiation treatments (0.09% per treatment) were recorded in our voluntary error database. The incidence of errors related to patient/tumor site, treatment planning/data transfer, and patient setup/treatment delivery was 9%, 40.2%, and 50.8%, respectively. The compliance rate for the checklists and timeouts initiative was 97% (P<.001). These and other QA measures resulted in a significant reduction in many categories of errors. The introduction of checklists and timeouts has been successful in eliminating errors related to wrong patient, wrong site, and wrong dose. Conclusions: A comprehensive QA program that regularly monitors staff compliance together with a robust voluntary error reporting system can reduce or eliminate errors that could result in serious patient injury. We recommend the adoption of these relatively simple QA initiatives including the use of checklists and timeouts for all staff to improve the safety of patients undergoing radiation therapy in the modern era.

Kalapurakal, John A., E-mail: j-kalapurakal@northwestern.edu [Department of Radiation Oncology, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States); Zafirovski, Aleksandar; Smith, Jeffery; Fisher, Paul; Sathiaseelan, Vythialingam [Department of Radiation Oncology, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States)] [Department of Radiation Oncology, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States); Barnard, Cynthia [Department of Quality Strategies, Northwestern Memorial Hospital, Chicago, Illinois (United States)] [Department of Quality Strategies, Northwestern Memorial Hospital, Chicago, Illinois (United States); Rademaker, Alfred W. [Department of Preventive Medicine, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States)] [Department of Preventive Medicine, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States); Rave, Nick [Department of Physicians Services, Northwestern Memorial Hospital, Chicago, Illinois (United States)] [Department of Physicians Services, Northwestern Memorial Hospital, Chicago, Illinois (United States); Mittal, Bharat B. [Department of Radiation Oncology, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States)] [Department of Radiation Oncology, Northwestern University Feinberg School of Medicine, Chicago, Illinois (United States)

2013-06-01T23:59:59.000Z

197

QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1  

Broader source: Energy.gov [DOE]

QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1 US Department of Energy, Office of Quality Assurance Programs (EH-31)

198

Waste Management Program management plan. Revision 1  

SciTech Connect (OSTI)

As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

NONE

1997-02-01T23:59:59.000Z

199

Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant`s QA programs that are necessary for this project.

NONE

1996-07-01T23:59:59.000Z

200

Bioenergy Technologies Office Multi-Year Program Plan: May 2013...  

Energy Savers [EERE]

Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update This is the May 2013 Update to the...

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE Hydrogen and Fuel Cells Program Plan (September 2011)  

Fuel Cell Technologies Publication and Product Library (EERE)

The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

202

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network [OSTI]

and stockpiling of material from a former settling pond, off-site disposal of the stockpile, building cleanup 2004) was published that specified the off-site disposal of the affected material. The purpose of this Task Plan is to control the remediation process for the off-site disposal of the metals

203

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Department’s Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

204

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

205

Reasoning about Plan Revision in Agent Programs Natasha Alechina  

E-Print Network [OSTI]

and executing a plan a b p Plan(a;b) Natasha Alechina Reasoning about plan revision TIME 2012 5 / 46 #12;WhatReasoning about Plan Revision in Agent Programs Natasha Alechina University of Nottingham, UK TIME 2012, Leicester 14 September 2012 Natasha Alechina Reasoning about plan revision TIME 2012 1 / 46 #12

Fisher, Michael

206

Methodologies for estimating one-time hazardous waste generation for capacity generation for capacity assurance planning  

SciTech Connect (OSTI)

This report contains descriptions of methodologies to be used to estimate the one-time generation of hazardous waste associated with five different types of remediation programs: Superfund sites, RCRA Corrective Actions, Federal Facilities, Underground Storage Tanks, and State and Private Programs. Estimates of the amount of hazardous wastes generated from these sources to be shipped off-site to commercial hazardous waste treatment and disposal facilities will be made on a state by state basis for the years 1993, 1999, and 2013. In most cases, estimates will be made for the intervening years, also.

Tonn, B.; Hwang, Ho-Ling; Elliot, S. [Oak Ridge National Lab., TN (United States); Peretz, J.; Bohm, R.; Hendrucko, B. [Univ. of Tennessee, Knoxville, TN (United States)

1994-04-01T23:59:59.000Z

207

N Reactor Deactivation Program Plan. Revision 4  

SciTech Connect (OSTI)

This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

Walsh, J.L.

1993-12-01T23:59:59.000Z

208

Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program. Revision 1  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) consists of a series of tests conducted on a regular frequency to evaluate the capability for nondestructive assay of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed with TRU waste characterization systems. Measurement facility performance will be demonstrated by the successful analysis of blind audit samples according to the criteria set by this Program Plan. Intercomparison between measurement groups of the DOE complex will be achieved by comparing the results of measurements on similar or identical blind samples reported by the different measurement facilities. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess the performance of measurement groups regarding compliance with established Quality Assurance Objectives (QAOs). As defined for this program, a PDP sample consists of a 55-gallon matrix drum emplaced with radioactive standards and fabricated matrix inserts. These PDP sample components, once manufactured, will be secured and stored at each participating measurement facility designated and authorized by Carlsbad Area Office (CAO) under secure conditions to protect them from loss, tampering, or accidental damage.

None

1997-05-01T23:59:59.000Z

209

Westinghouse Hanford Company Pollution Prevention Program Implementation Plan  

SciTech Connect (OSTI)

This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

Floyd, B.C.

1994-10-01T23:59:59.000Z

210

Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010)  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricityofWater DemandsReleaseAsEnergy

211

Planning aquatic ecosystem restoration monitoring programs  

SciTech Connect (OSTI)

This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

Thom, R.M.; Wellman, K.F.

1997-01-01T23:59:59.000Z

212

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan  

SciTech Connect (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

213

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect (OSTI)

The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

GREAGER, T.M.

1999-12-14T23:59:59.000Z

214

Updated 7/2014Post-MS Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

and Health Informatics 3 Total 3 Total 3 Total 3 Year2 Advanced Practice Nursing Theory* (N722 or N741 or N751) 3 N761 Program Planning, Evaluation and Quality Improvement 3 N708 Ethics for Advanced Practice in Health Care 2 Elective (can be taken any semester) 3 Total 6 Total 3 Total 2 Year3 N828 Clinical

Sheridan, Jennifer

215

Updated 7/2014Post-BS Full-Time Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

and Application of Evidence- Based Practice 3 Total 12 Total 12 Total 6 Year2 N726 Foundations for APN Clinical761 Program Planning, Evaluation and Quality Improvement 3 N772 Leadership and Organizational Decision Making in Health Care 3 Elective (can be taken any semester) 3 Total 12 Total 12 Total 2 Year3 N826

Sheridan, Jennifer

216

Updated 7/2014Post-BS Part-Time Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

Pathophysiology 3 N761 Program Planning, Evaluation and Quality Improvement 3 Total 6 Total 6 Total 3 Year2 N704 Psychiatric Mental Health **N828/829: variable 2-4 credits with 6 credits total required ***N906: 6 credits total required, may be completed in two semesters with consent of faculty advisor and N906 course

Sheridan, Jennifer

217

Tomotherapy treatment plan quality assurance: The impact of applied criteria on passing rate in gamma index method  

SciTech Connect (OSTI)

Purpose: Pretreatment patient plan verification with gamma index (GI) metric analysis is standard procedure for intensity modulated radiation therapy (IMRT) treatment. The aim of this paper is to evaluate the variability of the local and global gamma index obtained during standard pretreatment quality assurance (QA) measurements for plans performed with Tomotherapy unit. The QA measurements were performed with a 3D diode array, using variable passing criteria: 3%/3 mm, 2%/2 mm, 1%/1 mm, each with both local and global normalization.Methods: The authors analyzed the pretreatment QA results for 73 verifications; 37 were prostate cancer plans, 16 were head and neck plans, and 20 were other clinical sites. All plans were treated using the Tomotherapy Hi-Art System. Pretreatment QA plans were performed with the commercially available 3D diode array ArcCHECK™. This device has 1386 diodes arranged in a helical geometry spaced 1 cm apart. The dose measurements were acquired on the ArcCHECK™ and then compared with the calculated dose using the standard gamma analysis method. The gamma passing rate (%GP), defined as the percentage of points satisfying the condition GI < 1, was calculated for different criteria (3%/3 mm, 2%/2 mm, 1%/1 mm) and for both global and local normalization. In the case of local normalization method, the authors set three dose difference threshold (DDT) values of 2, 3, and 5 cGy. Dose difference threshold is defined as the minimum absolute dose error considered in the analysis when using local normalization. Low-dose thresholds (TH) of 5% and 10% were also applied and analyzed.Results: Performing a paired-t-test, the authors determined that the gamma passing rate is independent of the threshold values for all of the adopted criteria (5%TH vs 10%TH, p > 0.1). Our findings showed that mean %GPs for local (or global) normalization for the entire study group were 93% (98%), 84% (92%), and 66% (61%) for 3%/3 mm, 2%/2 mm, and 1%/1 mm criteria, respectively. DDT was equal to 2 cGy for the local normalization analysis cases. The authors observed great variability in the resulting %GP. With 3%/3 mm gamma criteria, the overall passing rate with local normalization was 4.6% less on the average than with global one, as expected. The wide difference between %GP calculated with global or local approach is also confirmed by an unpaired t-test statistical analysis.Conclusions: The variability of %GP obtained confirmed the necessity to establish defined agreement criteria that could be universal and comparable between institutions. In particular, while the gamma passing rate does not depend on the choice of threshold, the choice of DDT strongly influences the gamma passing rate for local calculations. The difference between global and local %GP was statistically significant for prostate and other treatment sites when DDT was changed from 2 to 3 cGy.

Bresciani, Sara; Di Dia, Amalia; Maggio, Angelo; Cutaia, Claudia; Miranti, Anna; Infusino, Erminia; Stasi, Michele [Medical Physics Division, Institute for Cancer Research and Treatment (IRCCS), 10060 Candiolo (Italy)] [Medical Physics Division, Institute for Cancer Research and Treatment (IRCCS), 10060 Candiolo (Italy)

2013-12-15T23:59:59.000Z

218

FY97 Geothermal R&D Program Plan  

SciTech Connect (OSTI)

This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

None

1996-09-01T23:59:59.000Z

219

Site support program plan for ICF Kaiser Hanford Company  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

Dieterle, S.E.

1996-09-27T23:59:59.000Z

220

Egypt's population policies and family planning program: a critical examination  

E-Print Network [OSTI]

Egypt's national family planning program, in existence since 1965, has been fairly successful in increasing the use of family planning methods and lowering the population growth rate in Egypt. However, the fact that as few as 10 percent of women...

Carr, Aline B.

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAO's). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the drummed waste PDP, a simulated waste container consists of a 55-gallon matrix drum emplaced with radioactive standards and fabricated matrix inserts. These PDP sample components are distributed to the participating measurement facilities that have been designated and authorized by the Carlsbad Field Office (CBFO). The NDA Drum PDP materials are stored at these sites under secure conditions to protect them from loss, tampering, or accidental damage. Using removable PDP radioactive standards, isotopic activities in the simulated waste containers are varied to the extent possible over the range of concentrations anticipated in actual waste characterization situations. Manufactured matrices simulate expected waste matrix conditions and provide acceptable consistency in the sample preparation process at each measurement facility. Analyses that are required by the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with various regulatory requirements and that are included in the PDP may only be performed by measurement facilities that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes in this document.

DOE Carlsbad Field Office

2001-04-06T23:59:59.000Z

222

US RERTR Program: overview, status and plans  

SciTech Connect (OSTI)

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

223

Continual Learning Program/Individual Training Plans- No Excuses  

Broader source: Energy.gov [DOE]

The Continual Learning Program (CLP) currently has 4 workshops that focus on employee development. The Individual Development Plan (IDP) is one of the resources discussed in the workshops.

224

State Energy Program Strategic Plan for the 21st Century  

Broader source: Energy.gov [DOE]

Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

225

Guadalupe Valley Electric Cooperative- Conservation Plan 7 Loan Program  

Broader source: Energy.gov [DOE]

Guadalupe Valley Electric Cooperative offers an incentive for members to increase the energy efficiency of existing homes and facilities through the Conservation Plan 7 Loan Program. The loan...

226

State Energy Program Helps States Plan and Implement Efficiency...  

Office of Environmental Management (EM)

More Documents & Publications State Energy Program Helps States Plan and Implement Energy Efficiency Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;...

227

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect (OSTI)

The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

GREAGER, T.M.

1999-09-09T23:59:59.000Z

228

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

229

Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

Fix, N. J.

2008-01-07T23:59:59.000Z

230

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

None

1988-10-01T23:59:59.000Z

231

Program Academic Quality Plan Department of Construction Management  

E-Print Network [OSTI]

Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

Moore, Paul A.

232

Power Planning and Fish and Wildlife Program Development  

E-Print Network [OSTI]

Power Planning and Fish and Wildlife Program Development RELATIONSHIP OF THE POWER PLAN TO THE FISH AND WILDLIFE PROGRAM: SUFFICIENT RESOURCES TO MEET ELECTRICITY DEMANDS AND THE REQUIREMENTS FOR FISH and to accommodate system operations to benefit fish and wildlife. The central purpose of this chapter of the power

233

Who's Evaluating What? Planned Program Evaluations | Department...  

Energy Savers [EERE]

Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Getting Useful Real-Time Feedback About Your Program...

234

Next Generation Nuclear Plant Materials Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for managing the R&D program elements; (2) Developing a specific work package for the R&D activities to be performed during each government fiscal year; (3) Reporting the status and progress of the work based on committed deliverables and milestones; (4) Developing collaboration in areas of materials R&D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and (5) Ensuring that the R&D work performed in support of the materials program is in conformance with established Quality Assurance and procurement requirements. The objective of the NGNP Materials R&D Program is to provide the essential materials R&D needed to support the design and licensing of the reactor and balance of plant, excluding the hydrogen plant. The materials R&D program is being initiated prior to the design effort to ensure that materials R&D activities are initiated early enough to support the design process and support the Project Integrator. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge; thus, new materials and approaches may be required.

G.O. Hayner; R.L. Bratton; R.N. Wright

2005-09-01T23:59:59.000Z

235

Environmental, Safety, and Health Plan for the remedial investigation of the liquid low-level waste tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

The Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be used during the Oak Ridge National Laboratory (ORNL) RI/FS project to protect the health and safety of employees, the public, and the environment. The ES&H Plan acts as a management extension for ORNL and Energy Systems to direct and control implementation of the project ES&H program. This report describes the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual task remedial investigations, project facilities, and other major tasks assigned to the project.

Not Available

1991-09-01T23:59:59.000Z

236

GEOTHERMAL RESERVOIR ENGINEERING MANGEMENT PROGRAM PLAN (GREMP PLAN)  

E-Print Network [OSTI]

2 Mission of Division of Geothermal Energy . . . . .Coordination with Other Geothermal Programs . . . . . . 6the Behavior of Geothermal Systems . . . . . . . . . 1 6

Bloomster, C.H.

2010-01-01T23:59:59.000Z

237

Acid rain program: CEMS submission instructions for monitoring plans, certification test notifications, and quarterly reports  

SciTech Connect (OSTI)

The Acid Rain Program regulations require all affected utility units to continuously measure, record and report SO2, NOx, volumetric flow data and CO2 emissions. All affected units also must continuously measure and record opacity, and must report opacity exceedances to the appropriate State or Local Agency. To ensure that your CEMS and fuel flowmeters are performing at an acceptable level, and providing quality assured data, you are required under 40 CFR 75.53, 75.62 (a) to submit a monitoring plan and certification test data for acid rain CEM certificaton. The purpose of this handbook is to help you fulfill your requirements under the Acid Rain Program. This handbook will walk you through the necessary steps for gaining CEMS certification, including filling out and mailing the proper forms, administering the required tests, and applying for certification and sending in electronic data to EPA.

NONE

1995-05-12T23:59:59.000Z

238

E-Print Network 3.0 - assurance program fcap Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to checking satisfiability... and Programming 33rd International Colloquium, ICALP 2006, Venice : Italie (2006)" DOI : 10.100711787006 12 Source: Ecole Polytechnique, Centre de...

239

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

McCarthy, Kathryn A. [INL; Busby, Jeremy [ORNL; Hallbert, Bruce [INL; Bragg-Sitton, Shannon [INL; Smith, Curtis [INL; Barnard, Cathy [INL

2014-04-01T23:59:59.000Z

240

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

2013-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Waste certification program plan for Oak Ridge National Laboratory  

SciTech Connect (OSTI)

This document defines the waste certification program being developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in U.S. Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls) waste. Program activities will be conducted according to ORNL Level 1 document requirements.

Kornegay, F.C.

1996-09-01T23:59:59.000Z

242

Princeton's Office of Gift Planning can help you explore ways to make a bequest that will assure your own legacy on campus. Making a gift from your estate begins with the  

E-Print Network [OSTI]

Princeton's Office of Gift Planning can help you explore ways to make a bequest that will assure and estate-related expenses are paid, to Princeton. · A testamentary trust can be helpful for you and your at Princeton. Gift Planning staff members, working with the Office of General Counsel, will help ensure

243

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the Carlsbad Field Office (CBFO). The nuclear material type, mass and associated alpha activity of the NDA PDP radioactive standard sets have been specified and fabricated to allow assembly of PDP samples that simulate TRU alpha activity concentrations, radionuclidic/isotopic distributions and physical forms typical of the DOE TRU waste inventory. The PDP matrix drum waste matrix types were derived from an evaluation of information contained in the Transuranic Waste Baseline Inventory Report (TWBIR) to ensure representation of prevalent waste types and their associated matrix characteristics in NDA PDP testing. NDA drum analyses required by the Waste Isolation Pilot Plant (WIPP) may only be performed by measurement facilities that comply with the performance criteria as set forth in the NDA PDP Plan. In this document, these analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes.

Carlsbad Field Office

2005-08-03T23:59:59.000Z

244

E-Print Network 3.0 - assurance program pcap Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

et al. (2003) PCAP: a whole-genome assembly program... ), PCAP (Huang et al., 2003) and Atlas (Havlak et al., 2004)), in some cases after running the assemblers Source: Shapiro,...

245

Performance Assurance for Multi-Year Contracts Under the Utility Incentive Program  

SciTech Connect (OSTI)

This 4-page fact sheet provides guidance for federal energy and facility managers on participation in utility programs for the management of electricity demand, and energy and water conservation.

Not Available

2007-08-01T23:59:59.000Z

246

Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single- blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

Carlsbad Field Office

2006-09-21T23:59:59.000Z

247

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

2012-01-01T23:59:59.000Z

248

Storm Water Management Plan Program (Nebraska)  

Broader source: Energy.gov [DOE]

This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

249

QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3  

Broader source: Energy.gov [DOE]

QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

250

Quality Assurance Exchange March 2006, Volume 2 Issue 1  

Broader source: Energy.gov [DOE]

Quality Assurance Exchange March 2006, Volume 2 Issue 1 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

251

Technology Innovation Program Programmatic Plan: FY 2011 FY 2014  

E-Print Network [OSTI]

Technology Innovation Program Programmatic Plan: FY 2011 ­ FY 2014 Critical National Need Area & intelligent automation (#3) Technologies to enable a smart grid (#4) Technologies for water availability (#6) Sustainability Technologies for personalized medicine (#5) Complex networks Manufacturing Advanced sensing

Magee, Joseph W.

252

THE MASTER OF ENGINEERING IN MANUFACTURING ENGINEERING PROGRAM PLANNING SHEET  

E-Print Network [OSTI]

for Manufacturing ME 526 Simulation of Physical Processes ME 535 Green Manufacturing METHE MASTER OF ENGINEERING IN MANUFACTURING ENGINEERING PROGRAM PLANNING SHEET be at the 500 level or above. 1. Core Manufacturing Requirement ­ 24 credits

253

Tank waste remediation system privatization phase I infrastructure and project W-519 and QA implementation plan  

SciTech Connect (OSTI)

This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001.

HUSTON, J.J.

1999-08-19T23:59:59.000Z

254

Quality Assurance Specialist  

Broader source: Energy.gov [DOE]

Alternate Title(s):Quality Control Technician; Quality Assurance Inspector; Quality Assurance Representative

255

Quality Assurance Guide for Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

2008-06-27T23:59:59.000Z

256

A Basic Guide to EM's Quality Assurance Program | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 Chief FreedomServices » Program Management » Quality

257

Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP for boxed waste assay systems. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAO’s). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the boxed waste PDP, a simulated waste container consists of a modified standard waste box (SWB) emplaced with radioactive standards and fabricated matrix inserts. An SWB is a waste box with ends designed specifically to fit the TRUPACT-II shipping container. SWB’s will be used to package a substantial volume of the TRU waste for disposal. These PDP sample components are distributed to the participating measurement facilities that have been designated and authorized by the Carlsbad Field Office (CBFO). The NDA Box PDP materials are stored at these sites under secure conditions to protect them from loss, tampering, or accidental damage. Using removable PDP radioactive standards, isotopic activities in the simulated waste containers are varied to the extent possible over the range of concentrations anticipated in actual waste characterization situations. Manufactured matrices simulate expected waste matrix configurations and provide acceptable consistency in the sample preparation process at each measurement facility. Analyses that are required by the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with various regulatory requirements and that are included in the PDP may only be performed by measurement facilities that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes in this document.

Carlsbad Field Office

2001-01-31T23:59:59.000Z

258

RELAP5/MOD3 code quality assurance plan for ORNL ANS narrow channel flow and heat transfer correlations  

SciTech Connect (OSTI)

Modifications have been made to REIAP5 to account for flow and heat transfer in narrow channels between fuel plates such as found in the cores of the Advanced Neutron Source (ANS) and High Flux Isotope Reactor (HFIR) reactors. These early models were supplied by Art Ruggles of Oak Ridge National Laboratory (ORNL) and Don Fletcher of the Idaho National Engineering Laboratory (INEL) and were adapted to and implemented into RELAP5 by Rich Riemke, Rex Shumway and Ken Katsma. The purpose of this report is to document the current status of these special models in the standard version of RELAP5/MOD3 and describe the quality assurance procedures.

MIller, C.S.; Shumway, R.W.

1992-11-01T23:59:59.000Z

259

Student Judicial Programs 2010-2011 Strategic Plan  

E-Print Network [OSTI]

Student Judicial Programs 2010-2011 Strategic Plan Updated: August 19, 2010 Mission Promoting Student Success Vision Student Judicial Programs will challenge students to become active participants and educationally adjudicating alleged violations of the Code of Student Conduct. Values As a member of the campus

Rock, Chris

260

Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

Cook, James R.

2005-12-07T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Quality Assurance Exchange April 2009, Volume 5 Issue 1  

Broader source: Energy.gov [DOE]

Quality Assurance ExchangeA pril 2009, Volume 5 Issue 1 U.S. Department of Energy Office of Quality Assurance Policy and Assistance IN THE SPOTLIGHT: GEORGE DETSIS, PROGRAM MANAGER Analytical Services Program Office of Corporate Safety Programs

262

Quality Assurance: Are Laboratories Assuring, Assessing, or Assuming the Quality of Clinical Testing Today?  

E-Print Network [OSTI]

Abstract: Quality assurance implies making certain, guaranteeing the attainment of quality. Do laboratories actually guarantee the quality of testing services today? If not, what is the purpose of quality assurance plans, programs, and practices? Have laboratories even defined the quality to be achieved for each test? If not, how can quality be guaranteed? Do current efforts in assessing quality provide for real-time control that will guarantee quality? If not, are laboratories just assuming that measuring quality will somehow make it happen? Even analytical quality, which is fundamental for the core production processes of any laboratory, is mainly assessed and assumed, not assured. Problems include the lack of well defined quality requirements, inadequate method performance, poorly designed statistical control procedures, misguided quality control instructions and recommendations, insufficient technical quality management skills, reduced operator skills, and delays in implementing of laboratory regulations. Quality assurance should be understood, not as a component, but as the outcome of a quality management process that includes quality planning, quality laboratory practices, quality control, quality assessment, and quality improvement, all linked together and guided by quality goals and customer requirements, and applied to the total testing process. In the future, automation and computerization will be necessary to manage the quality of centralized and distributed laboratory testing. Analytical quality will be guaranteed through on-line or on-board quality control. Other critical quality characteristics will need real-time monitors and control mechanisms to guarantee quality if process failures cannot be prevented.

James O. Westgard, Ph.D.

263

Tanks focus area multiyear program plan - FY96-FY98  

SciTech Connect (OSTI)

The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

NONE

1995-07-01T23:59:59.000Z

264

Fiscal year 1986 program plan for the Defense Transuranic Waste Program (DTWP)  

SciTech Connect (OSTI)

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy is national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 86 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of all R D activities meet requirements tated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 86; outyear budget projections are presented for future years.

Not Available

1985-11-01T23:59:59.000Z

265

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program  

Broader source: Energy.gov [DOE]

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

266

California Sea Grant College Program Strategic Plan  

E-Print Network [OSTI]

Program, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, supported environmental, social and economic needs of people in our coastal, ocean, and Great Lakes regions. A searchable....................................................................................15 Healthy Coastal & Marine Ecosystems (HCME).....................16 Resilient Coastal Communities

Jaffe, Jules

267

Program Development Plan and Team up  

SciTech Connect (OSTI)

The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

Solar Electric Power Association

2001-12-01T23:59:59.000Z

268

Geochemical engineering and materials program plan  

SciTech Connect (OSTI)

The Department of Energy (DOE) was designated as lead agency in discharging the overall legislative mandate for federal R&D to assist the private sector in developing appropriate technology for exploiting geothermal energy resources. The Geochemical Engineering and Materials (GEM) Program was conceived, as part of DOE'S overall strategy, to address specific and plant-wide problems and uncertainties in the use of materials and in geochemical engineering. This program assists industry in the conduct of long-term,high-risk R&D needed to overcome the significant technical and economic GEM-related obstacles faced by developers and potential developers of this alternative energy source. The program focuses on: (1) Increasing the knowledge about the properties of materials and their performance under geothermal energy system conditions; (2) Developing and utilizing more reliable and/or cost-effective materials than previously available; and (3) Developing a greater understanding of and control over geochemical processes during fluid production and transport, energy conversion, and waste management. As a stand-alone program and as support to other DOE geothermal technology development programs, the GEM Program contributes to the feasibility of designing and operating efficient, reliable, and safe fluid handling and energy conversion systems.

None

1982-08-01T23:59:59.000Z

269

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

270

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

271

Experimental program plan for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

Not Available

1994-01-01T23:59:59.000Z

272

Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan  

SciTech Connect (OSTI)

The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

Casey, Leslie A. [DOE/NNSA

2004-09-01T23:59:59.000Z

273

Atmospheric Radiation Measurement Program Science Plan  

SciTech Connect (OSTI)

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM's Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

Ackerman, T

2004-10-31T23:59:59.000Z

274

State Energy Program Helps States Plan  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverview *Agency Recovery Act Program Helps

275

Oil shale program plan, FY 1989  

SciTech Connect (OSTI)

The oil shale program is directed to the development of advanced technologies for extracting shale oil from the large domestic resources. The overall goal is to foster development of an economically competitive and environmentally acceptable oil shale industry. A series of technology development steps must be taken by DOE, other government agencies and other governments and/or industry to achieve this goal. They include basic and applied R and D, proof-of-concept activities, first-of-a-kind field tests and associated commercial-scale activity. Activities associated with the oil shale program are designed to: Expand the technically recoverable resource base, increase recovery efficiency, reduce capital and operating costs and/or enhance environmental acceptability. In support of the overall program goal, oil shale research has two major technical goals: (1) Technology Base Development. To produce an engineering and scientific information base for industry use in designing and developing oil shale processes with reduced costs and enhanced environmental acceptability and to foster the development of novel oil shale processes and, (2) Environmental Mitigation. To develop a comprehensive data base on pollutant generation and the steps required to mitigate the impacts in a cost-effective manner. This report discusses the above goals. 9 refs., 1 fig., 1 tab.

Not Available

1989-06-01T23:59:59.000Z

276

Coal Power Systems strategic multi-year program plans  

SciTech Connect (OSTI)

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

277

Quality Assurance 8-1 8. Quality Assurance  

E-Print Network [OSTI]

of a well-designed and well-implemented sampling and analysis program is to measure accurately what assurance/quality control (QA/QC) program for environmental monitoring activities at the ORR is essential Martin analytical laboratories have well-established QA/QC programs, well- trained and highly qualified

Pennycook, Steve

278

Quality Assurance 8-1 8. Quality Assurance  

E-Print Network [OSTI]

The overall goal of a well-designed and well-implemented sampling and analysis program is to measure of a quality assurance/quality control (QA/QC) program for environmental monitoring activities at the ORR sampling QA program and for incorporation of new procedures to reflect chang- ing technologies

Pennycook, Steve

279

Next Generation Nuclear Plant Methods Research and Development Technical Program Plan -- PLN-2498  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2008-09-01T23:59:59.000Z

280

Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order ensures that the quality of DOE/NNSA products and services meets or exceeds the customer's expectations. This Order cancels DOE O 414.1A, Quality Assurance, dated 9-29-99, and Attachment 1, paragraph 8, and Attachment 2, paragraph 22, of DOE O 440.1A, Worker Protection Management for DOE Federal and Contractor Employees, dated 3-27-98. Cancels: DOE O 414.1A and DOE O 440.1A, parts as noted.

2004-04-29T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

State Energy Program Strategic Plan: February 2007  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment of EnergyImpacts State Energy Program2-002State

282

Program Execution Plan Mission Support Organizations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins Gerald HahnThomasProgram Booklet/2014

283

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

284

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

285

BA Political Science Assessment Plan Program Learning Goals  

E-Print Network [OSTI]

BA Political Science ­ Assessment Plan Program Learning Goals Undergraduate students gain familiarity with American political behavior and institutions, the nature of politics in the rest of the world, and the sources of international conflict and cooperation. All students majoring in political science take

Cantlon, Jessica F.

286

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning  

E-Print Network [OSTI]

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning under is implemented in the GAMS grid computing environment. Computational results on a variety of oilfield development cycle of a typical offshore oilfield project consists of the following five steps: (1) Exploration

Grossmann, Ignacio E.

287

A Program Plan for Photovoltaic Buildings in Florida  

Broader source: Energy.gov [DOE]

This document outlines plans developed by the Florida Solar Energy Center (FSEC) to support photovoltaic buildings application in the state through the first decade of the 21st century. The emphasis of this program is on identifying and increasing the value of rooftop systems to targeted end users through the use of application experiments.

288

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.  

SciTech Connect (OSTI)

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

2011-10-01T23:59:59.000Z

289

Technology and Consumer Products Branch: program plan  

SciTech Connect (OSTI)

The primary objective of the Technology and Consumer Products Branch (TCP) is to encourage the development and commercialization of energy-efficient technologies and equipment used in buildings and purchased by consumers. The TCP program conducts technical research, development, and demonstration efforts jointly funded with private industry, educational institutions, utilities, and other Federal and state agencies as appropriate. All contracts, grants, or interagency agreements have the major thrust of developing products and disseminating information that will accelerate commercial availability of energy-efficient, low-cost, reliable technologies, techniques, and products suitable for use by consumers and design professionals in the residential and commercial building sectors. Specifically, the technologies pursued by the branch include heating and cooling systems, consumer appliances, lighting design, and systems. Projects for each of these areas are summarized briefly, and publications resulting from the activities are listed.

None

1980-03-01T23:59:59.000Z

290

Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan  

SciTech Connect (OSTI)

The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

Early, T.O.

1994-05-01T23:59:59.000Z

291

Proposed resource evaluation plan. Salton Sea scientific drilling program  

SciTech Connect (OSTI)

The report presents a plan for evaluating the deep geothermal resource in the Salton Sea area of Imperial County, California. The plan is divided into two testing programs, followed by the modeling and evaluation of the underground geothermal resource. The testing program related to geological data collection includes acquiring and analyzing the core, running geophysical and temperature/pressure logs in both the deep well and the injection well, and carrying out extensive mud-logging activities. The flow testing program includes temperature, pressure, and flow measurements made in the well and surface facilities. Sampling and analysis of fluid and scale both in the well and at the surface facilities will also be carried out. 6 refs., 7 figs., 7 tabs. (ACR)

Not Available

1985-03-01T23:59:59.000Z

292

Environmental development plan for transportation programs: FY80 update  

SciTech Connect (OSTI)

This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

1980-09-01T23:59:59.000Z

293

Space Telescope Programs Hubble Observatory  

E-Print Network [OSTI]

Assurance/Configuration Management Mr. Christopher Scholz EAG QA Manager #12;Space Telescope Programs Hubble · COS-UCB-002 QA Implementation Plan Released December 1, 1999 · COS-UCB-003 CM Plan released DecemberSpace Telescope Programs Hubble Observatory HST-COS FUV PER 11/8/00 FUV Detector System Quality

Colorado at Boulder, University of

294

Water Power Program: Program Plans, Implementation, and Results  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012NuclearBradleyBudget Water Power Program Budget

295

Multiyear Program Plan for the High Temperature Materials Laboratory  

SciTech Connect (OSTI)

Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

Arvid E. Pasto

2000-03-17T23:59:59.000Z

296

SNL/CA Environmental Planning and Ecology Program Annual Report 2007.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2007-02-01T23:59:59.000Z

297

SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2005-05-01T23:59:59.000Z

298

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

299

Environmental, Safety, and Health Plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Revision 1, Environmental Restoration Program  

SciTech Connect (OSTI)

This Environmental, Safety, and Health (ES&H) Plan presents the concepts and methodologies to be followed during the remedial investigation/feasibility study (RI/FS) for Oak Ridge National Laboratory (ORNL) to protect the health and safety of employees, the public, and the environment. This ES&H Plan acts as a management extension for ORNL and Martin Marietta Energy Systems, Inc. (Energy Systems) to direct and control implementation of the project ES&H program. The subsections that follow describe the program philosophy, requirements, quality assurance measures, and methods for applying the ES&H program to individual waste area grouping (WAG) remedial investigations. Hazardous work permits (HWPs) will be used to provide task-specific health and safety requirements.

Not Available

1993-05-01T23:59:59.000Z

300

Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program  

SciTech Connect (OSTI)

This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects of the program. The report also outlines a process for establishing a database for the fusion research program that will indicate how each research element fits into the overall program. This database will also include near-term milestones associated with each research element, and will facilitate assessments of the balance within the program at different levels. The Office of Fusion Energy Sciences plans to begin assembling and using the database in the Spring of 2001 as we receive proposals from our laboratories and begin to prepare our budget proposal for Fiscal Year 2003.

None

2000-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A pioneering application of NQA-1 quality assurance standards in the development of software  

SciTech Connect (OSTI)

One reason for systematically applying quality assurance to computer software is the extensive use of results from computer programs to characterize potential sited for nuclear waste repositories leading ultimately to important policy making decisions. Because data from these programs characterize the likely radioactivity profile for many hundreds of years, experimental validation is not feasible. The Sensitivity and Uncertainty Analysis Methods Development Project (SUAMDP) was developed to formulate and utilize efficient and comprehensive methods for determining sensitivities of calculated results with respect to changes in all input parameters. The computerized methodology was embodied in the Gradient Enhanced Software System (GRESS). Due to the fact that GRESS was to be used in the site characterization for waste storage, stringent NQA-1 requirements were imposed by the sponsor. A working relationship between the Oak Ridge National Laboratory (ORNL) Quality Department and the research scientists developing GRESS was essential in achieving understanding and acceptance of the quality assurance requirements as applied to the SUAMDP. The relationship resulted in the SUAMDP becoming the first software project at ORNL to develop a comprehensive NQA-1 Quality Assurance Plan; this plan now serves as a model for software quality assurance at ORNL. This paper describes the evolution of this plan and its impact on the application of quality assurance procedures to software. 2 refs.

Weisbin, A.N.

1988-01-01T23:59:59.000Z

302

Performance demonstration program plan for RCRA constituent analysis of solidified wastes  

SciTech Connect (OSTI)

Performance Demonstration Programs (PDPS) are designed to help ensure compliance with the Quality Assurance Objectives (QAOs) for the Waste Isolation Pilot Plant (WIPP). The PDPs are intended for use by the Department of Energy (DOE) Carlsbad Area Office (CAO) to assess and approve the laboratories and other measurement facilities supplying services for the characterization of WIPP TRU waste. The PDPs may also be used by CAO in qualifying laboratories proposing to supply additional analytical services that are required for other than waste characterization, such as WIPP site operations. The purpose of this PDP is to test laboratory performance for the analysis of solidified waste samples for TRU waste characterization. This performance will be demonstrated by the successful analysis of blind audit samples of simulated, solidified TRU waste according to the criteria established in this plan. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess laboratory performance regarding compliance with the QAOs. The concentration of analytes in the PDP samples will address levels of regulatory concern and will encompass the range of concentrations anticipated in actual waste characterization samples. Analyses that are required by the WIPP to demonstrate compliance with various regulatory requirements and which are included in the PDP must be performed by laboratories that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses and the samples on which they are performed are referred to as WIPP samples for the balance of this document.

NONE

1995-06-01T23:59:59.000Z

303

Risk communications and the Chemical Stockpile Emergency-Planning Program  

SciTech Connect (OSTI)

The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

Vogt, B.M.; Sorensen, J.H.

1994-09-01T23:59:59.000Z

304

Tank waste remediation system vadose zone program plan  

SciTech Connect (OSTI)

The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

Fredenburg, E.A.

1998-07-27T23:59:59.000Z

305

Y-12 Site environmental protection program implementation plan (EPPIP)  

SciTech Connect (OSTI)

The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

NONE

1996-11-01T23:59:59.000Z

306

Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999  

SciTech Connect (OSTI)

DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

Not Available

1993-12-01T23:59:59.000Z

307

Program Plans, Implementation, and Results | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombinedDepartment of Energy 2:52pm Addthis InAbout » Program Plans,

308

The Marshall Plan: History's Most Successful Structural Adjustment Program  

E-Print Network [OSTI]

1972). Bureaucracy, the Marshall Plan, and the NationalHogan, Michael (1987). The Marshall Plan: America, Britain,Kindleberger, Charles (1987), Marshall Plan Days Kostrzewa,

DeLong, J. Bradford; Eichengreen, Barry

1991-01-01T23:59:59.000Z

309

Local Energy Assurance Planning Selectees  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10IO1OP001 LetterLight-Duty11.2.1310 DOEFundsEnergy

310

Track 9: Quality Assurance  

Broader source: Energy.gov [DOE]

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 9: Quality Assurance

311

Reinforcing of QA/QC programs in radiotherapy departments in Croatia: Results of treatment planning system verification  

SciTech Connect (OSTI)

Implementation of advanced techniques in clinical practice can greatly improve the outcome of radiation therapy, but it also makes the process much more complex with a lot of room for errors. An important part of the quality assurance program is verification of treatment planning system (TPS). Dosimetric verifications in anthropomorphic phantom were performed in 4 centers where new systems were installed. A total of 14 tests for 2 photon energies and multigrid superposition algorithms were conducted using the CMS XiO TPS. Evaluation criteria as specified in the International Atomic Energy Agency Technical Reports Series (IAEA TRS) 430 were employed. Results of measurements are grouped according to the placement of the measuring point and the beam energy. The majority of differences between calculated and measured doses in the water-equivalent part of the phantom were in tolerance. Significantly more out-of-tolerance values were observed in “nonwater-equivalent” parts of the phantom, especially for higher-energy photon beams. This survey was done as a part of continuous effort to build up awareness of quality assurance/quality control (QA/QC) importance in the Croatian radiotherapy community. Understanding the limitations of different parts of the various systems used in radiation therapy can systematically improve quality as well.

Jurkovi?, Slaven; Švabi?, Manda; Dikli?, Ana; Smilovi? Radoj?i?, ?eni; Dundara, Dea [Clinic for Radiotherapy and Oncology, Physics Division, University Hospital Rijeka, Rijeka (Croatia); Kasabaši?, Mladen; Ivkovi?, Ana [Department for Radiotherapy and Oncology, University Hospital Osijek, Osijek (Croatia); Faj, Dario, E-mail: dariofaj@mefos.hr [Department of Physics, School of Medicine, University of Osijek, Osijek (Croatia)

2013-04-01T23:59:59.000Z

312

Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices  

SciTech Connect (OSTI)

Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

Bechtel Nevada

1998-12-31T23:59:59.000Z

313

National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

2007-02-01T23:59:59.000Z

314

The development of the quality assurance program for PM2.5: The December 13, 1996 proposal, the July 18, 1997 regulations and the public comments concerning QA  

SciTech Connect (OSTI)

The Environmental Protection Agency (EPA) has developed a new National Ambient Air Quality Standard (NAAQS) standard for particles in the atmosphere with aerometric diameters of 2.5 micrometers or less. The EPA has also promulgated a new federal reference and equivalent method program to regulate the methods needed to monitor these particles. This federal reference method (FRM) is very complex and sensitive and requires enhanced quality assurance (QA) and quality control (QC) procedures to ensure that a valid sample is collected. The QA program for PM2.5 was first introduced in the December 13, 1996 proposal published in the Federal Register. This proposal outlined several QA procedures for the PM2.5 program. The precision of an existing monitoring network was to be determined with collocated monitors and flow checks. The bias of a monitoring network was to be determined with a new QA procedure that required bi-monthly audits on all PM2.5 monitors using a portable FRM audit sampler. Consistent with Agency policy, this proposal was open to public comment and review. The Agency received over 30,000 comments many of which concerned the QA program. The QA system was modified, based upon these comments, to reduce the logistical burden for the implementation of the program. The subsequent modifications were finalized in the July 18, 1997 regulations published in the Federal Register. This finalized QA program required 25% of the monitors to be collocated, quarterly flow audits on all PM2.5 monitors used in the SLAMS network, and 25% of all PM2.5 monitors to be independently audited with the new FRM audit sampler. Details of the QA system are found in 40 CFR Part 58, Appendix A.

Musick, D.; Papp, M.; Elkins, J. [Environmental Protection Agency (United States)

1998-12-31T23:59:59.000Z

315

Budget FY 1995 site support program plan WBS 6.10.1  

SciTech Connect (OSTI)

This is the program plan of Budget for the fiscal year 1995 site support. The topics of the program plan include a general mission statement, the primary customers, major activities performed to deliver products and services, program priorities, goals and objectives, assumptions, issues and constraints, performance measures, work breakdown structure and responsibility assignment matrix, description of activities and milestone list.

Wemhoff, G.M.

1994-09-01T23:59:59.000Z

316

Waste certification program plan for Oak Ridge National Laboratory. Revision 2  

SciTech Connect (OSTI)

This document defines the waste certification program (WCP) developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the WCP is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements for mixed (both radioactive and hazardous) and hazardous [including polychlorinated biphenyls (PCB)] waste. Program activities will be conducted according to ORNL Level 1 document requirements.

Not Available

1997-09-01T23:59:59.000Z

317

Quality Assurance Specialist (Safety Software Qualtiy Assurance)  

Broader source: Energy.gov [DOE]

A successful candidate in this position performs safety software quality assurance oversight of all activities that support the Waste Isolation Pilot Plant (WIPP) compliance with environmental,...

318

Proceedings of the flexible, midsize gas turbine program planning workshop  

SciTech Connect (OSTI)

The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

NONE

1997-03-01T23:59:59.000Z

319

Building system integration research: recommendations for a US Department of Energy multiyear program plan  

SciTech Connect (OSTI)

This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

Not Available

1986-01-01T23:59:59.000Z

320

Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)  

SciTech Connect (OSTI)

The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public.

Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

1982-08-02T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

E-Print Network 3.0 - assurance sampling method Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for NRDA followed standard operating procedure (SOP), water sampling plans, Summary: procedures, and NOAA's Analytical Quality Assurance Project Plan (QAPP). Samples were sent to...

322

E-Print Network 3.0 - analytical quality assurance Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for NRDA followed standard operating procedure (SOP), water sampling plans, Summary: procedures, and NOAA's Analytical Quality Assurance Project Plan (QAPP). Samples were sent...

323

SSL Pricing and Efficacy Trend Analysis for Utility Program Planning  

SciTech Connect (OSTI)

An LED lamp or luminaire can generally be found that matches or exceeds the efficacy of benchmark technologies in a given product category, and LED products continue to expand into ever-higher lumen output niches. However, the price premium for LED continues to pose a barrier to adoption in many applications, in spite of expected savings from reduced energy use and maintenance. Other factors—such as dimmability and quality of light—can also present challenges. The appropriate type, timing, and magnitude of energy efficiency activities will vary from organization to organization based on local variables and the method of evaluation. A number of factors merit consideration when prioritizing activities for development. Category-specific projections for pricing and efficacy are provided herein to assist in efficiency program planning efforts.

Tuenge, Jason R.

2013-10-01T23:59:59.000Z

324

Next Generation Nuclear Plant Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

P. E. MacDonald

2005-01-01T23:59:59.000Z

325

Next Generation Nuclear Plant Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

None

2005-01-01T23:59:59.000Z

326

BA Economics and BA Financial Economics Assessment Plan Program Learning Objectives  

E-Print Network [OSTI]

BA Economics and BA Financial Economics ­ Assessment Plan Program Learning Objectives The program will prepare graduates: 1. Understand the "economic way model economic decisions. 3. The ability to analyze historical and current events

Cantlon, Jessica F.

327

Quality Planning Handbook VERSION 1.0 November 22, 1999, 1998  

E-Print Network [OSTI]

Report DQOs Data Quality Objectives GIS Geographic Information System MSR Management Systems Review Performance Evaluation QA Quality Assurance QC Quality Control QSMP Quality Systems Management Plan PQMP Program Quality Management Plans QIWP Quality Integrated Work Plan QSSC Quality Systems Science Center R

328

Office of Quality Assurance  

Broader source: Energy.gov [DOE]

The Office of Quality Assurance establishes and maintains the quality assurance (QA) policies, requirements and guidance for the Department and serves as DOE's corporate resource to ensure that products and services meet or exceed the Department’s quality objectives.

329

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

SciTech Connect (OSTI)

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

330

FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report  

SciTech Connect (OSTI)

This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-10-01T23:59:59.000Z

331

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect (OSTI)

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

332

Radiological Assistance Program, DOE Region 6 response plan  

SciTech Connect (OSTI)

This program plan meets all the requirements identified in DOE Order 5530.3, Radiological Assistance Program and supports those requirements leading to the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC) as required by DOE 5530-5. Requests for radiological assistance may come from other DOE facilities, Federal or state agencies, tribal officials, or from any private corporation or individual. Many of the requests will be handled by a telephone call, a conference or a letter, teletype or memorandum. Other requests for assistance may involve radioactive material in serious accidents, fire, personal injuries, contamination or possible hazards to the general public. Some occurrences may require the dispatch of trained personnel equipped with radiation monitoring instruments and related equipment necessary to evaluate, control and neutralize the hazard. The primary responsibility for incidents involving radioactive material always remains with the party having custody of the radioactive materials. In addition, the DOE recognizes that the assistance provided shall not in any way preempt state, tribal, or local authority and/or responsibility on state or tribal properties. Toward this end, DOE assistance for non-DOE radioactive materials, is limited to technical assistance, advice, measurement and other resources as deemed necessary by the local authorities but excludes DOE interface with the public media. This is a function handled by the local or state Incident Commander.

Jakubowski, F.M.

1993-02-01T23:59:59.000Z

333

Materials Issues for Micromachines Development - ASCI Program Plan  

SciTech Connect (OSTI)

This report summarizes materials issues associated with advanced micromachines development at Sandia. The intent of this report is to provide a perspective on the scope of the issues and suggest future technical directions, with a focus on computational materials science. Materials issues in surface micromachining (SMM), Lithographic-Galvanoformung-Abformung (LIGA: lithography, electrodeposition, and molding), and meso-machining technologies were identified. Each individual issue was assessed in four categories: degree of basic understanding; amount of existing experimental data capability of existing models; and, based on the perspective of component developers, the importance of the issue to be resolved. Three broad requirements for micromachines emerged from this process. They are: (1) tribological behavior, including stiction, friction, wear, and the use of surface treatments to control these, (2) mechanical behavior at microscale, including elasticity, plasticity, and the effect of microstructural features on mechanical strength, and (3) degradation of tribological and mechanical properties in normal (including aging), abnormal and hostile environments. Resolving all the identified critical issues requires a significant cooperative and complementary effort between computational and experimental programs. The breadth of this work is greater than any single program is likely to support. This report should serve as a guide to plan micromachines development at Sandia.

FANG,HUEI ELIOT; BATTAILE,CORBETT C.; BENAVIDES,GILBERT L.; ENSZ,MARK T.; BUCHHEIT,THOMAS E.; LAVAN,DAVID A.; CHEN,ER-PING; CHRISTENSON,TODD R.; DE BOER,MAARTEN P.; MILLER,SAMUEL L.; DUGGER,MICHAEL T.; PRASAD,SOMURI V.; REEDY JR.,EARL DAVID; THOMPSON,AIDAN P.; WONG,CHUNGNIN C.; YANG,PIN

2000-05-01T23:59:59.000Z

334

Landlord Program multi-year program plan fiscal year 1995 WBS 7.5  

SciTech Connect (OSTI)

The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items.

Young, C.L.

1994-09-26T23:59:59.000Z

335

Geothermal Energy Multi-Year Program Plan, FY 1993-1997  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

None

1992-03-01T23:59:59.000Z

336

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

None

1995-03-03T23:59:59.000Z

337

Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.

Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

2013-09-01T23:59:59.000Z

338

General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1  

SciTech Connect (OSTI)

This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

Moreno, S.R.

1995-09-01T23:59:59.000Z

339

Surveillance Guides - QAS 2.6 Quality Assurance Records  

Broader source: Energy.gov (indexed) [DOE]

is to evaluate the effectiveness of the contractor's implementation of the program to identify, collect and maintain quality assurance records. The surveillance...

340

Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan  

SciTech Connect (OSTI)

The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

Not Available

1994-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program  

SciTech Connect (OSTI)

The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

Not Available

1993-07-01T23:59:59.000Z

342

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

343

Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

Good, D.E.

1995-09-01T23:59:59.000Z

344

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

SciTech Connect (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

345

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

SciTech Connect (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

346

(Environmental impact assessment as applied to policies, plans and programs)  

SciTech Connect (OSTI)

A proposal to study the application of the principles of environmental impact assessment (EIA) to policy, plans, and programs was submitted by the US Environmental Protection Agency (EPA) to the Senior Advisors on Environmental and Water Problems of the United Nations Economic Commission. On approval, EPA asked Oak Ridge National Laboratory (ORNL) to support its efforts as lead participant on an international task force. ORNL is responsible for overall project management, including development of the report. At the first meeting in Geneva on June 18--19, there were representatives from Austria, Canada, Finland, Norway, Poland, Sweden, and the United Kingdom. The administrative/legal setting for EIA in each country was reviewed. The objectives of the task force were defined, and issues related to the application of EIA at the policy level were discussed. At the second meeting, in addition to those countries represented at the first meeting the Commission of Economic Communities, Czech and Slovak Federal Republic, Remark, Federal Republic of Germany, Hungary, and The Netherlands were represented. A brief review was given by the new participants of legal/administrative requirements for EIA in their countries. Case studies were presented by Canada, Finland, The Netherlands, Norway, Sweden, and the United States.

Sigal, L.L.

1990-10-19T23:59:59.000Z

347

Science Plan for the Atmospheric Radiation Measurement Program (ARM)  

SciTech Connect (OSTI)

The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE`s programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols.

NONE

1996-02-01T23:59:59.000Z

348

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

349

Waste certification program plan for Oak Ridge National Laboratory. Revision 1  

SciTech Connect (OSTI)

This document defines the waste certification program developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in US Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls) waste. Program activities will be conducted according to ORNL Level 1 document requirements.

Orrin, R.C.

1997-05-01T23:59:59.000Z

350

Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProjectProjectsDiffusion

351

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect (OSTI)

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

352

PLANNING DOCUMENT: STUDENT AND ADVISOR Ph.D. Program Benchmark Worksheet  

E-Print Network [OSTI]

PLANNING DOCUMENT: STUDENT AND ADVISOR Ph.D. Program Benchmark Worksheet SCHOOL OF EDUCATION rev072314 Key SoE=School A=Advisor S=Student Target Date Activity Responsibility Welcome Week Receive assignment of advisor and orientation to program SoE Fall ­ Year 1 Meet with advisor Discuss proposed program

Rose, Michael R.

353

Multiyear Program Plan: Reducing Friction and Wear in Heavy Vehicles  

SciTech Connect (OSTI)

As described in its multiyear program plan for 1998-2000, the Office of Heavy Vehicle Technologies (OHVT) envisions the development of a fuel-flexible, energy-efficient, near-zero-emissions, heavy-duty U.S. diesel engine technology devolving into all truck classes as a real and viable strategy for reducing energy requirements for commercial transport services and the rapidly growing multipurpose vehicle market (pickups, vans, and sport utility vehicles). Implementation of the OHVT program plan will have significant national benefits in energy savings, cleaner air, more jobs, and increased gross domestic product (GDP). Successful implementation will reduce the petroleum consumption of Class 1-8 trucks by 1.4 million barrels of oil per day by 2020 and over 1.8 million by 2030, amounting to a reduction in highway petroleum consumption of 13.2% and 18.6%, respectively. All types of regulated emissions will be reduced, that is, 20% drop in PM10 emissions (41,000 metric tons per year) by 203 0, 17% reduction in CO2 greenhouse gases (205 million metric tons per year), 7% reduction in NOx, 20% reduction in NMHC, and 30% reduction in CO. An increase of 15,000 jobs by 2020 is expected, as is an increase of $24 billion in GDP. The strategy of OHVT is to focus primarily on the diesel engine since it has numerous advantages. It has the highest efficiency of any engine today, 45% versus 30% for production gasoline engines; and it can be made more efficient at least to 55% and possibly up to 63%. It is the engine of choice for heavy vehicles (trucks), because it offers power, efficiency, durability, and reliability and is used extensively in rail, marine, and off-road applications. Its emission can be ultra-low to near zero, and the production infrastructure is already in place. The primary goals of OHVT are as follows: (1) Develop by 2002 the diesel-engine enabling technologies to support large-scale industry dieselization of light trucks, achieving a 35% fuel efficiency improvement over equivalent gasoline-fueled trucks. (2) Develop by 2004 the enabling technology for a Class 7-8 truck with a fuel efficiency of 10 mpg (at 65 mph) that will meet prevailing emission standards, using either diesel or a liquid alternative fuel. (3) Develop by 2006 diesel engines with fuel flexibility and a thermal efficiency of 55% with liquid alternative fuels, and a thermal efficiency of 55% with dedicated gaseous fuels. (4) Develop a methodology for analyzing and evaluating the operation of a heavy vehicle as an integrated system, considering such factors as engine efficiency; emissions; rolling resistance; aerodynamic drag; friction, wear, and lubrication effects; auxiliary power units; material substitutions for reducing weight; and other sources of parasitic energy losses. Overarching these considerations is the need to preserve system functionality, cost, competitiveness, reliability, durability, and safety.

R.R. Fessler; G.R. Fenske

1999-12-13T23:59:59.000Z

354

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

355

Improved Load Plan Design Through Integer Programming Based ...  

E-Print Network [OSTI]

The fundamental building block in load planning is a direct trailer, or a direct. ... of shipment and trailer dispatching; (2) integrated consideration of the movement ...

2011-12-21T23:59:59.000Z

356

Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

357

Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.

Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

1992-02-01T23:59:59.000Z

358

MIXED INTEGER PROGRAMMING FOR MULTI-VEHICLE PATH PLANNING  

E-Print Network [OSTI]

.up.pt http://www.fe.up.pt/ecc2001/ Keywords: autonomous vehicles, path planning, collision avoidance Abstract This paper presents a new approach to fuel-optimal path plan- ning of multiple vehicles using a combination will be optimized with respect to both fuel and/or time, and must ensure that the vehicles do not collide with each

How, Jonathan P.

359

Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1  

SciTech Connect (OSTI)

This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

360

Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995.

Good, D.E.

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

2002-05-20T23:59:59.000Z

362

Infrastructure Assurance Center  

E-Print Network [OSTI]

, the United States relied on natural gas to meet about 22% of its energy needs. Therefore, assuring efficient, natural gas processing plants, and other industrial customers, along with the changes in the utilizationInfrastructure Assurance Center NGReal-time: processing and analysis tool for natural gas delivery

363

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

SciTech Connect (OSTI)

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

364

Concurrent constraint programming-based path planning for uninhabited air vehicles  

E-Print Network [OSTI]

Concurrent constraint programming-based path planning for uninhabited air vehicles Stefano Gualandi path length, fuel consumption, and path risk are given as well. 1. INTRODUCTION Path planning is a well, it becomes relevant when defining an air vehicle mission. Due to all the domain constraints to be considered

Bonaventure, Olivier

365

Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING  

E-Print Network [OSTI]

Economic Geography ESG 212 Urban Geography ESG 248 Geographyof Food ESG 249 Resource Management ESG 264 ESG 348 Urban Planning ESG 349 Watershed Management ESG 350 Environmental Justice ESG 354 EnvirDepartment of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING

366

A Multistage Stochastic Programming Approach for the Planning of Offshore Oil or Gas Field Infrastructure  

E-Print Network [OSTI]

1 A Multistage Stochastic Programming Approach for the Planning of Offshore Oil or Gas Field, Houston, TX 77098 Abstract The planning of offshore oil or gas field infrastructure under uncertainty is addressed in this paper. The main uncertainties considered are in the initial maximum oil or gas flowrate

Grossmann, Ignacio E.

367

Wind Energy Multiyear Program Plan for 2007-2012  

SciTech Connect (OSTI)

The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

Not Available

2007-08-01T23:59:59.000Z

368

ASSURANCES - NON-CONSTRUCTION PROGRAMS  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquids Reserve3.Revenue3 Oil and(Million OMB Number:

369

Assurances - Non-Construction Programs  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical Challenges toReport | DepartmentAppropriationsAssociation of Home

370

Quality Assurance 9 2009 Site environmental report9-  

E-Print Network [OSTI]

throughout the entire organization. The purpose of the BNL Quality Management (QM) System is to implement QM methodology throughout the various Laboratory management systems and associated processes, in order to: PlanQuality Assurance 9 2009 Site environmental report9- DRAFT Quality assurance is an integral part

371

Quality Assurance 9 2008 Site environmental report9-  

E-Print Network [OSTI]

throughout the entire organization. The purpose of the BNL Quality Management (QM) System is to implement QM methodology throughout the various Laboratory management systems and associated processes, in order to: PlanQuality Assurance 9 2008 Site environmental report9- DRAFT Quality assurance is an integral part

372

Public Interest Energy Research Program Research Development and Demonstration Plan  

E-Print Network [OSTI]

and Demonstration Plan Attachment IV - Carbon Sequestration in California's Terrestrial Ecosystems and Geological ..................................................................................................................................1 3.1 Global Warming and the Need for Carbon Sequestration.....................................................1 3.2 Carbon Sequestration Basics

373

Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11  

SciTech Connect (OSTI)

The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

Moore, D.A.

1994-09-01T23:59:59.000Z

374

NIF Title III engineering plan  

SciTech Connect (OSTI)

The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

Deis, G

1998-06-01T23:59:59.000Z

375

E-Print Network 3.0 - assurance systems engineering Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Sciences 7 STEM Degrees NOT Eligible for 17 Month Extension SU Program Name CIP Code Program Name on SEVIS I-20 Summary: and Information Scien Systems Assurance...

376

Clean coal technologies: Research, development, and demonstration program plan  

SciTech Connect (OSTI)

The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

Not Available

1993-12-01T23:59:59.000Z

377

IT Capital Planning Corporate Management Improvement Program (CMIP)  

Broader source: Energy.gov [DOE]

The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

378

Mission Plan for the Civilian Radioactive Waste Management Program...  

Broader source: Energy.gov (indexed) [DOE]

Waste Management Program Summary In response to the the requirement of the Nuclear Waste Policy Act of 1982, the Office of Civilian Radioactive Waste Management in the...

379

Software quality assurance handbook  

SciTech Connect (OSTI)

There are two important reasons for Software Quality Assurance (SQA) at Allied-Signal Inc., Kansas City Division (KCD): First, the benefits from SQA make good business sense. Second, the Department of Energy has requested SQA. This handbook is one of the first steps in a plant-wide implementation of Software Quality Assurance at KCD. The handbook has two main purposes. The first is to provide information that you will need to perform software quality assurance activities. The second is to provide a common thread to unify the approach to SQA at KCD. 2 figs.

Not Available

1990-09-01T23:59:59.000Z

380

IFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou  

E-Print Network [OSTI]

. As ITER serves as a fusion testing facility for magnetic fusion energy (MFE) nuclear technology componentIFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou chamber technology testing program in NIF involoving: criteria for evaluation

Abdou, Mohamed

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Quality Assurance Baseline Assessment Report to Los Alamos National Laboratory Analytical Chemistry Operations  

SciTech Connect (OSTI)

This report summarizes observations that were made during a Quality Assurance (QA) Baseline Assessment of the Nuclear Materials Technology Analytical Chemistry Group (NMT-1). The Quality and Planning personnel, for NMT-1, are spending a significant amount of time transitioning out of their roles of environmental oversight into production oversight. A team from the Idaho National Engineering and Environmental Laboratory Defense Program Environmental Surety Program performed an assessment of the current status of the QA Program. Several Los Alamos National Laboratory Analytical Chemistry procedures were reviewed, as well as Transuranic Waste Characterization Program (TWCP) QA documents. Checklists were developed and the assessment was performed according to an Implementation Work Plan, INEEL/EXT-98-00740.

Jordan, R. A.

1998-09-01T23:59:59.000Z

382

Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary  

SciTech Connect (OSTI)

This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

none,

1987-03-01T23:59:59.000Z

383

Heavy vehicle hybrid propulsion systems R and D program plan, FY 2000-2005  

SciTech Connect (OSTI)

This report contains the program plan and background information for the Heavy Vehicle Hybrid Propulsion R and D Program sponsored by the Department of Energy's Office of Heavy Vehicle Technologies. The program is a collaboration between industry and government established for the development of advanced hybrid-electric propulsion technology for urban cycle trucks and buses. It targets specific applications to enhance potential market success. Potential end-users are also involved.

None

2000-07-01T23:59:59.000Z

384

Software Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01. To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). Does not cancel other directives.

2000-10-02T23:59:59.000Z

385

Software Quality Assurance  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.

2000-10-02T23:59:59.000Z

386

Revised Master Plan for the Hood River Production Program, Technical Report 2008.  

SciTech Connect (OSTI)

The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

2008-04-28T23:59:59.000Z

387

NYC property tax exemption program : existing policies and future planning  

E-Print Network [OSTI]

New York City's tax expenditures relate to real property tax totaled $4.5 billion in fiscal year 2012. The largest expenditure relates to the "421-a" tax exemption program for new multi-family residential real estate ...

Wu, Jenny Chiani

2012-01-01T23:59:59.000Z

388

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

389

Texas LoanSTAR Monitoring and Analysis Program Draft Plan  

E-Print Network [OSTI]

mechanism to fund energy-conserving retrofits of state, public school and local government buildings. Retrofit projects will be identified by energy audits conducted according to the guidelines of the Texas State Energy Conservation Program (SECP). Each... energy savings projected from the retrofit projects. Public schools and local governments are targeted for Phase II of LoanSTAR. Previous engineering audits of these facilities conducted under the Institutional Conservation Program (ICP) revealed...

Claridge, D. E.; Haberl, J. S.; Heffington, W. M.; O'Neal, D. L.; Turner, W. D.; Etheredge, R.; Glass, M.

1989-01-01T23:59:59.000Z

390

Program Plan for Renewable Energy generation of electricity. Response to Section 2111 of the Energy Policy Act of 1992  

SciTech Connect (OSTI)

A 5-Year Program Plan for providing cost-effective options for generating electricity from renewable energy sources is presented by the US Department of Energy Office of Energy Efficiency and Renewable Energy. The document covers the Utility-Sector situation, scope of the program, specific generating technologies, and implementation of the program plan.

NONE

1994-12-01T23:59:59.000Z

391

RERTR Program: goals, progress and plans. [Reduced Enrichment Research and Test Reactor  

SciTech Connect (OSTI)

The status of the US Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief outline of RERTR Program objectives and goals, program accomplishments are discussed with emphasis on the development, demonstration and application of new LEU fuels. Most program activities have proceeded as planned, and a combination of two silicide fuels (U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al) holds excellent promise for achieving the long-term program goals. Current plans and schedules project the uranium density of qualified RERTR fuels for plate-type reactors to grow by approximately 1 g U/cm/sup 3/ each year, from the nearly null value of 1982 to the 7.0 g U/cm/sup 3/ which will be reached in early 1989. The technical needs of research reactors for HEU exports are also estimated to undergo a gradual but dramatic decline in the coming years.

Travelli, A.

1984-09-25T23:59:59.000Z

392

Highly Integrated Quality Assurance – An Empirical Case  

SciTech Connect (OSTI)

Highly Integrated Quality Assurance – An Empirical Case Drake Kirkham1, Amy Powell2, Lucas Rich3 1Quality Manager, Radioisotope Power Systems (RPS) Program, Idaho National Laboratory, P.O. Box 1625 M/S 6122, Idaho Falls, ID 83415-6122 2Quality Engineer, RPS Program, Idaho National Laboratory 3Quality Engineer, RPS Program, Idaho National Laboratory Contact: Voice: (208) 533-7550 Email: Drake.Kirkham@inl.gov Abstract. The Radioisotope Power Systems Program of the Idaho National Laboratory makes an empirical case for a highly integrated Quality Assurance function pertaining to the preparation, assembly, testing, storage and transportation of 238Pu fueled radioisotope thermoelectric generators. Case data represents multiple campaigns including the Pluto/New Horizons mission, the Mars Science Laboratory mission in progress, and other related projects. Traditional Quality Assurance models would attempt to reduce cost by minimizing the role of dedicated Quality Assurance personnel in favor of either functional tasking or peer-based implementations. Highly integrated Quality Assurance adds value by placing trained quality inspectors on the production floor side-by-side with nuclear facility operators to enhance team dynamics, reduce inspection wait time, and provide for immediate, independent feedback. Value is also added by maintaining dedicated Quality Engineers to provide for rapid identification and resolution of corrective action, enhanced and expedited supply chain interfaces, improved bonded storage capabilities, and technical resources for requirements management including data package development and Certificates of Inspection. A broad examination of cost-benefit indicates highly integrated Quality Assurance can reduce cost through the mitigation of risk and reducing administrative burden thereby allowing engineers to be engineers, nuclear operators to be nuclear operators, and the cross-functional team to operate more efficiently. Applicability of this case extends to any high-value, long-term project where traceability and accountability are determining factors.

Drake Kirkham; Amy Powell; Lucas Rich

2011-02-01T23:59:59.000Z

393

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM | Department of...  

Broader source: Energy.gov (indexed) [DOE]

PROGRAM SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM Training Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM More Documents & Publications Quality Assurance Checklist...

394

A consumer-oriented approach to interpretive program planning for birding  

E-Print Network [OSTI]

Factors. This study supports the contention that a more direct method of obtaining information from visitors is needed. These results were counter to intuition, implying that more than expertise alone is needed for planning. Implications... traditionally focused on the resource base first, developed program objectives next, then decided the media to present this information to the public. This present study examines an alternative method of planning; namely, consulting the visitor first...

Hobson, William Joseph

1982-01-01T23:59:59.000Z

395

A study to determine if in-depth professional development provided to extension educators on program development has an effect on planning, implementing, and evaluating extension educational programs  

E-Print Network [OSTI]

Academy,� was designed and implemented from May 2006 to November 2006 to provide early to mid-career Extension educators with comprehensive instruction related to program planning, program implementation and evaluation and interpretation. A Pre...

Dromgoole, Darrell Allen

2007-09-17T23:59:59.000Z

396

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy Secretary Steven Chuof Energy Plan

397

94-1 R&D Program Annual Operating Plan  

SciTech Connect (OSTI)

The 94-1 R&D Program focuses on developing the technical basis for stabilizing and safely storing plutonium-bearing materials. To address these issues, we have in place a material identification and stabilization project, a surveillance and monitoring project, and a management team.

Mason, Richard E.; Dominguez, Pamela D.

2003-09-01T23:59:59.000Z

398

Hanford site transuranic waste sampling plan  

SciTech Connect (OSTI)

This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed.

GREAGER, T.M.

1999-05-13T23:59:59.000Z

399

TASK TECHNICAL AND QUALITY ASSURANCE PLAN FOR THE CHARACTERIZATION AND LEACHING OF A THERMOWELL AND CONDUCTIVITY PROBE PIPE SAMPLE FROM TANK 48H  

SciTech Connect (OSTI)

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. The material on the Tank 48H internal tank surfaces is estimated to have a total volume of approximately 115 gallons consisting of mostly water soluble solids with approximately 20 wt% insoluble solids (33 Kg TPB). This film is assumed to be readily removable. The material on the internal equipment/surfaces of Tank 48H is presumed to be easily removed by slurry pump operation. For Tank 49H, the slurry pumps were operated almost continuously for approximately 6 months after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids--Na{sub 3}H(CO){sub 2}, Al(OH){sub 3}, NaTPB, NaNO{sub 3} and NaNO{sub 2}. Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. Depending on when the Recycle material or inhibited water can be added to Tank 48H, the tank may not be allowed to agitate for this same amount of time. The tank will be filled above 150 inches and agitated at least once during the Aggregation process. If the material cannot be removed after completion of these batches, the material may be removed with additional fill and agitation operations. There is a risk that this will not remove the material from the internal surfaces. As a risk mitigation activity, properties of the film and the ease of removing the film from the tank will be evaluated prior to initiating Aggregation. This task will investigate the dissolution of Tank 48H solid deposits in inhibited water and DWPF recycle. To this end, tank personnel plan to cut and remove a thermowell pipe from Tank 48H and submit the cut pieces to SRNL for both characterization and leaching behavior. A plan for the removal, packaging and transport of the thermowell pipe has been issued. This task plan outlines the proposed method of analysis and testing to estimate (1) the thickness of the solid deposit, (2) chemical composition of the deposits and (3) the leaching behavior of the solid deposits in inhibited water (IW) and in Tank 48H aggregate solution.

Fondeur, F

2005-11-02T23:59:59.000Z

400

Savannah River Site Waste Management Program Plan, FY 1993. Revision 1  

SciTech Connect (OSTI)

The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

Not Available

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Satellite Navigation Integrity Assurance: Lessons Learned  

E-Print Network [OSTI]

Satellite Navigation Integrity Assurance: Lessons Learned from Hurricane Katrina ION GNSS 2008 by the FAA Satellite Navigation Program Office #12;17 September 2008 Lessons Learned from Hurricane Katrina 2 for probabilistic modeling and analysis #12;17 September 2008 Lessons Learned from Hurricane Katrina 3 Key Sources

Stanford University

402

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program  

SciTech Connect (OSTI)

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

Kimberlyn C. Mousseau

2011-12-01T23:59:59.000Z

403

Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision  

SciTech Connect (OSTI)

Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

Peterson, G.L. [comp.

1993-11-18T23:59:59.000Z

404

SRS ES&H standards compliance program management plan. Revision 1  

SciTech Connect (OSTI)

On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB`s initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan.

Hearn, W.H.

1993-09-08T23:59:59.000Z

405

Energy Storage Program Planning Document (2011) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessinSupporting Jobs andHVACEnergy Storage Program

406

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

407

Quality Assurance Source Requirements Traceability Database  

SciTech Connect (OSTI)

At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

2006-01-30T23:59:59.000Z

408

Impact of Quality Assurance Rounds in a Canadian Radiation Therapy Department  

SciTech Connect (OSTI)

Purpose: Quality assurance (QA) programs aim to identify inconsistencies that may compromise patient care. Radiation treatment planning is a well-documented source of variation in radiation oncology, leading many organizations to recommend the implementation of QA rounds in which radiation therapy plans are peer reviewed. This study evaluates the outcome of QA rounds that have been conducted by a radiation therapy department since 2004. Methods and Materials: Prospectively documented records of QA rounds, from 2004 to 2010, were obtained. During rounds, randomly selected radiation therapy plans were peer reviewed and assigned a grade of A (adequate), B (minor suggestions of change to a plan for a future patient), or C (significant change required before the next fraction). The proportion of plans that received each recommendation was calculated, and the relationship between recommendations for each plan, tumor site, and mean years of experience of the radiation oncologist (RO) were explored. Chart reviews were performed for each plan that received a C. Results: During the study period, 1247 plans were evaluated; 6% received a B and 1% received a C. The mean RO years of experience were lower for plans graded C versus those graded A (P=.02). The tumor sites with the highest proportion of plans graded B or C were gastrointestinal (14%), lung (13%), and lymphoma (8%). The most common reasons for plans to receive a grade of C were inadequate target volume coverage (36%), suboptimal dose or fractionation (27%), errors in patient setup (27%), and overtreatment of normal tissue (9%). Conclusions: This study demonstrated that QA rounds are feasible and an important element of a radiation therapy department's QA program. Through peer review, plans that deviate from a department's expected standard can be identified and corrected. Additional benefits include identifying patterns of practice that may contribute to inconsistencies in treatment planning and the continuing education of staff members who attend.

Lefresne, Shilo; Olivotto, Ivo A.; Joe, Howard; Blood, Paul A. [Radiotherapy Department, BC Cancer Agency, Vancouver Island Centre, Vancouver, British Columbia (Canada) [Radiotherapy Department, BC Cancer Agency, Vancouver Island Centre, Vancouver, British Columbia (Canada); Radiotherapy Department, University of British Columbia, Vancouver, British Columbia (Canada); Olson, Robert A., E-mail: rolson2@bccancer.bc.ca [Radiotherapy Department, University of British Columbia, Vancouver, British Columbia (Canada); Radiotherapy Department, BC Cancer Agency, Centre for the North, Prince George, British Columbia (Canada)

2013-03-01T23:59:59.000Z

409

Long term materials test program. Preliminary operations plan  

SciTech Connect (OSTI)

The Long Term Materials Testing (LTMT) PFB facility has been designed to duplicate the design point condition of the Coal-Fired Combined Cycle (CFCC) reference commercial plant design developed by GE under contract to DOE, including bed temperature (1750/sup 0/F), pressure (10 atm), excess air (20%), and gas residence time (1.8 sec). The test rig has a one foot diameter bed and consumes about 1.6 tons/day of coal and 0.5 tons/day of dolomite sulphur sorbent. Material specimens are contained in two test sections. The low velocity test section houses 132 pin specimens 1/4 dia., sixty of which can be cooled below the gas stream temperature. The nominal exposure environment of 1650/sup 0/F, 10 atm, 27 fps should ensure representative corrosive conditions, without erosion. The control system for the LTMT facility is designed to operate the rig in such a manner that the test specimens are subjected to constant, controlled conditions representative of the actual service environment. The Preliminary Test Plan presented in Section V outlines three phases of PFB testing, plus screening tests for candidate materials. Operating costs have been updated to reflect the preliminary rig design data and current raw material quotes. The projected operating costs have been effected by raw material costs since the time of the original estimate, but the overall cost per hour of test is still very low: $122/test hour.

None

1980-03-01T23:59:59.000Z

410

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan  

SciTech Connect (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-10-31T23:59:59.000Z

411

Characterization program management plan for Hanford K basin spent nuclear fuel  

SciTech Connect (OSTI)

The program management plan for characterization of the K Basin spent nuclear fuel was revised to incorporate corrective actions in response to SNF Project QA surveillance 1K-FY-99-060. This revision of the SNF Characterization PMP replaces Duke Eng.

TRIMBLE, D.J.

1999-07-19T23:59:59.000Z

412

An Inventory of Ecosystem Service Valuation Micah Effron, NOAA's Office of Program Planning  

E-Print Network [OSTI]

should NOAA value where? What valuation methods should be used? Is a NOAA valuation strategy evenAn Inventory of Ecosystem Service Valuation Studies Micah Effron, NOAA's Office of Program Planning and Integration 5/22/13 #12; What are ecosystem services? How are they valued? NOAA drivers for valuations

413

engineering101 2013-2014 program planning guide for first-year engineering students  

E-Print Network [OSTI]

engineering101 2013-2014 program planning guide for first-year engineering students in the Whiting School of Engineering at Johns Hopkins University environmental electrical and computer applied math and statistics biomedical computer science mechanical civil chemical and biomolecular engineering mechanics

Ghosh, Somnath

414

Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING  

E-Print Network [OSTI]

Students must complete 5 courses from one of the three streams Stream A) Environmental Impact and Policy Environmental Justice ESG 354 Envir'tal Impact Assessment ESG 358 Internat'l Environmental Issues ESG 362Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING

415

CHEMICAL HYGIENE PLAN (rev. 7/03/2012) Page 1 CHEMICAL HYGIENE PROGRAM  

E-Print Network [OSTI]

employers covered by the standard develop a Chemical Hygiene Plan (CHP). A CHP is a written program which, the CHP must include standard operating procedures, criteria for the implementation of chemical control for the interpretation and enforcement of policies described in this CHP. The Environmental Health & Safety staff

416

Automatic Running Planning for Omni-Directional Mobile Robot By Genetic Programming  

E-Print Network [OSTI]

because these OMRs have the running mechanism of wheels installed with free rollers or balls[1-roller running system. The motion analysis is also discussed to realize the autonomic off-road running. In order-directional mobile robot, crawler-roller running system, genetic programming, obstacle, running planning. 1

Fernandez, Thomas

417

A Strategic Program Plan for Fusion Energy Sciences Fusion Energy Sciences  

E-Print Network [OSTI]

, while creating manageable waste and little risk to public safety and health. Making fusion energy a part light atoms such as those of hydrogen, holds great promise for clean and abundant energy produc- tionA Strategic Program Plan for Fusion Energy Sciences 1 Fusion Energy Sciences #12;2 Bringing

418

Bicycle Urbanism Symposium -Program at a glance -Updated June 12, 2013 Advocacy, Planning and Implementation  

E-Print Network [OSTI]

Bicycle Urbanism Symposium - Program at a glance - Updated June 12, 2013 General Theme Advocacy, Planning and Implementation in the Puget Sound The Global Experience + Bicycle Cities of the Future Promoting Bicycling Rider Education / Crunching Numbers: Analyzing and Applying Cycling Data | Panels

Hochberg, Michael

419

Quality Assurance Corporate Board | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assurance Corporate Board Quality Assurance Corporate Board The Office of Environmental Management (EM) Quality Assurance Corporate Board is an executive board that includes both...

420

IFE chamber technology testing program in NIF and chamber development test plan  

SciTech Connect (OSTI)

Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF.

Abdou, M.A. [Univ. of California, Los Angeles, CA (United States)

1995-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Infrastructure Assurance Center  

E-Print Network [OSTI]

and impact-analysis tool developed by Argonne National Laboratory. This powerful tool allows for rapid, first in which flooding of the Savannah River along the South Carolina/Georgia border caused a 25% reduction Assurance Center Our nation relies on natural gas to meet about 22% of its energy needs. Within the next 10

Kemner, Ken

422

RUNWAY OPERATIONAL QUALITY ASSURANCE  

E-Print Network [OSTI]

RUNWAY OPERATIONAL QUALITY ASSURANCE MELANIE BAKER, DARIC MEGERSA & ALFONSO PANLILIO Sponsors: Dr Vortex Separation Rule, for a homogeneous fleet mix, is determined by the time between arriving aircraft Occupancy (SRO) rule, for a non- homogeneous fleet mix, MTC= 3600/ [ROT] [ROT]= = i (pi *ROTi) ROT (in sec

423

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE has mandated in DOE Order 5400.1 that its operations will be conducted in an environmentally safe manner. The Waste Isolation Pilot Plant (WIPP) will comply with DOE Order 5400.1 and will conduct its operations in a manner that ensures the safety of the environment and the public. This document outlines how the WIPP will protect and preserve groundwater within and surrounding the WIPP facility. Groundwater protection is just one aspect of the WIPP environmental protection effort. The WIPP groundwater surveillance program is designed to determine statistically if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will be determined and appropriate corrective action initiated.

Not Available

1993-12-31T23:59:59.000Z

424

Stochastic Programming and its Application to Optimal Generation Planning Stochastic Programming and its  

E-Print Network [OSTI]

to Optimal Generation Planning 4 0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 Xraw1 Xraw

McCalley, James D.

425

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 6.0 Program Management  

Broader source: Energy.gov [DOE]

Program Management section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated August 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

426

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 2.0 Program Benefits  

Broader source: Energy.gov [DOE]

Program Benefits section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated August 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

427

Quality assurance for gamma knives  

SciTech Connect (OSTI)

This report describes and summarizes the results of a quality assurance (QA) study of the Gamma Knife, a nuclear medical device used for the gamma irradiation of intracranial lesions. Focus was on the physical aspects of QA and did not address issues that are essentially medical, such as patient selection or prescription of dose. A risk-based QA assessment approach was used. Sample programs for quality control and assurance are included. The use of the Gamma Knife was found to conform to existing standards and guidelines concerning radiation safety and quality control of external beam therapies (shielding, safety reviews, radiation surveys, interlock systems, exposure monitoring, good medical physics practices, etc.) and to be compliant with NRC teletherapy regulations. There are, however, current practices for the Gamma Knife not covered by existing, formalized regulations, standards, or guidelines. These practices have been adopted by Gamma Knife users and continue to be developed with further experience. Some of these have appeared in publications or presentations and are slowly finding their way into recommendations of professional organizations.

Jones, E.D.; Banks, W.W.; Fischer, L.E. [Lawrence Livermore National Lab., CA (United States)

1995-09-01T23:59:59.000Z

428

Quality assurance and data management  

SciTech Connect (OSTI)

This report contains graphs and tables relating to quality assurance and data management for environmental quality at Hanford Reservation.

Lockrem, L.L.

1998-01-12T23:59:59.000Z

429

Project plan: Procedure system design for the Rocky Flats Plant Emergency Preparedness Program  

SciTech Connect (OSTI)

This procedure system is being designed for the Rocky Flats Plant Emergency Preparedness Program (EPP) to: assess the procedural needs of the Emergency Preparedness Program in light of the existing Rocky Flats Plant policies, plans, procedures, and applicable DOE orders; design the structure of the Emergency Preparedness Program procedural system based on the classes of procedures needed, the types of procedures (procedures vs job outline), the sections of procedures required, and the timetable for procedure maintenance; develop boiler plate formats for the various authors in writing the necessary standardized procedures; develop a list of all the necessary procedures that must be produced for Emergency Preparedness Program; and provide consistency for department-wide activities relating to the quality control in writing, distribution, and revising procedures for Emergency Preparedness Program. 23 refs., 18 figs.

Hodgin, C.R.; Brown-Strattan, M.

1989-10-01T23:59:59.000Z

430

ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program  

SciTech Connect (OSTI)

Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative transfer calculations, will be acquired using the aircraft and surface facilities available to ARESE. This document outlines the scientific approach and measurement requirements of the project.

Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

1995-09-27T23:59:59.000Z

431

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect (OSTI)

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The ``Proposal for Reporting Conduct of Operations & Quality Assurance Compliance to DOE`` describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

432

Conduct of Operations and Quality Assurance Compliance  

SciTech Connect (OSTI)

The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The Proposal for Reporting Conduct of Operations Quality Assurance Compliance to DOE'' describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

Andrews, N.S.

1992-06-01T23:59:59.000Z

433

AWARD FEE PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

functions, quality and effectiveness of Environment, Safety, Health and Quality Assurance (ESH&QA) Program, quality and effectiveness of waste management services, and...

434

Financial services FY 1995 site support program plan WBS 6.10.4  

SciTech Connect (OSTI)

This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

Vodney, E.P.

1994-09-01T23:59:59.000Z

435

Issues and answers on the Department of Energy Oil Shale RD and D Program Management Plan  

SciTech Connect (OSTI)

This document consists of Department of Energy replies to public comments made on the Department's Oil Shale RD and D Program and the RD and D Program Management Plan during an oil shale workshop held in December 1979 in Denver, Colorado, and incorporates responses from a number of Department offices and divisions currently associated with the Oil Shale Program. Workshop participants expressed concern in a number of areas associated with oil shale development impacts. Comments addressed effects on water quality and availability; air quality and solid waste impacts; impacts on terrestrial ecosystems; the pace of oil shale development; health, safety, and socioeconomic concerns; coordination among Federal, State, and local agencies during development of the shale resource; legislative and regulatory issues; financing of oil shale development; continued public education and involvement; and technology considerations (e.g., comments relating to shale oil upgrading, refining, product composition, and stability). Replies made by RD and D Program staff to the comments of workshop participants provide an overview of Department of Energy oil shale activities, both planned and ongoing, in the areas of concern addressed by the workshop. Although the responses focus on Department efforts to resolve these concerns, the research activities and responsibilities of other Federal agencies are also outlined. To supplement the RD and D Program response, recently published sources of information on oil shale development are identified that offer the public a more thorough description of Departmental research programs.

None

1980-09-01T23:59:59.000Z

436

Software Quality Assurance Subcommittee : Guidelines for Requirements...  

Broader source: Energy.gov (indexed) [DOE]

Software Quality Assurance Subcommittee : Guidelines for Requirements Management Software Quality Assurance Subcommittee : Guidelines for Requirements Management Requirements...

437

Designing and Implementing Effective Performance Assurance Plans  

Broader source: Energy.gov (indexed) [DOE]

view all areas of the room 4 Daylighting Controls Functional Test No. 4: a) During daylight hours, observe lights. b) Simulate reduction in day light, observe lights. c) During...

438

The ARRA EAP Energy Assurance Planning Bulletin  

Broader source: Energy.gov (indexed) [DOE]

during energy emergencies. DOE will also invite industry, non-profit, and Federal agency participants who are critical to the discussion. Stay tuned for more information...

439

A Template for a Performance Assurance Plan  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South Valley ResponsibleSubmissionof EnergyA Strategic Framework

440

The ARRA EAP Energy Assurance Planning Bulletin  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOfficeThe 21st Century TruckAPRIL 1, 2011

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

The ARRA EAP Energy Assurance Planning Bulletin  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOfficeThe 21st Century TruckAPRIL 1, 20113,

442

The ARRA EAP Energy Assurance Planning Bulletin  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOfficeThe 21st Century TruckAPRIL 1,

443

Local Energy Assurance Planning Selected Cities  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10IO1OP001 LetterLight-Duty11.2.1310 DOEFundsEnergy

444

2012 Quality Assurance Improvement Project Plan  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering ResearchServices4/08VirginiaOsuna- FLIGHTTEPPDepartment2012 NuclearDOE

445

2010 Quality Assurance Improvement Project Plan  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering ResearchServices4/08VirginiaOsuna- FLIGHT - -July05 WaysSmart0

446

Tanks Focus Area Alternative Salt Processing Research and Development Program Plan  

SciTech Connect (OSTI)

In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

Harmon, Harry D.

2000-11-30T23:59:59.000Z

447

Tanks Focus Area Alternative Salt Processing Research and Development Program Plan  

SciTech Connect (OSTI)

In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

Harmon, Harry D.

2000-05-15T23:59:59.000Z

448

A technology transfer plan for the US Department of Energy's Electric Energy Systems Program  

SciTech Connect (OSTI)

The major objective of this study was to develop a technology transfer plan that would be both practical and effective in promoting the transfer of the products of DOE/EES research to appropriate target audiences. The study drew upon several major components of the marketing process in developing this plan: definition/charcterization of the products being produced by the DOE/EES program, identification/characterization of possible users of the products being produced by the program, and documentation/analysis of the methods currently being used to promote the adoption of DOE/EES products. Fields covered include HVDC, new materials, superconductors, electric field effects, EMP impacts, battery storage/load leveling, automation/processing concepts, normal/emergency operating concepts, Hawaii deep water cable, and failure mechanisms.

Harrer, B.J.; Hurwitch, J.W.; Davis, L.J.

1986-11-01T23:59:59.000Z

449

Texas geothermal R D and D program planning support document. Final report  

SciTech Connect (OSTI)

Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

1981-08-28T23:59:59.000Z

450

UMTRA Project Office Federal Employee Occupational Safety and Health Program Plan. Final draft  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with the applicable requirements of DOE Order 3790.1 B and DOE Albuquerque Operations Office (AL) Order 3790.1A. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites, and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only the federal employees working on the UMTRA Project.

Young, B.H.

1994-02-01T23:59:59.000Z

451

UMTRA project office federal employee occupational safety and health program plan. Revision 1  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only federal employees working on the UMTRA Project.

Not Available

1994-06-01T23:59:59.000Z

452

Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan  

SciTech Connect (OSTI)

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

1998-02-01T23:59:59.000Z

453

Chemical analysis quality assurance at the ICPP  

SciTech Connect (OSTI)

This document discusses the chemical analysis quality assurance program at the ICPP which involves records management, analytical methods quality control, analysis procedures and training and qualification. Since 1979, the major portion of the quality assurance program has been implemented on a central analytical computer system. The individual features provided by the system are storage, retrieval, and search capabilities over all general request and sample analysis information, automatic method selection for all process streams, automation of all method calculations, automatic assignment of bias and precision estimates at all analysis levels, with-method-use requalification, untrained or unqualified analyst method lockout, statistical testing of all process stream results for replicate agreement, automatic testing of process results against pre- established operating, safety, or failure limits at varying confidence levels, and automatic transfer and report of all analysis data plus all statistical testing to the Production Department.

Hand, R.L.

1990-01-01T23:59:59.000Z

454

Chemical analysis quality assurance at the ICPP  

SciTech Connect (OSTI)

This document discusses the chemical analysis quality assurance program at the ICPP which involves records management, analytical methods quality control, analysis procedures and training and qualification. Since 1979, the major portion of the quality assurance program has been implemented on a central analytical computer system. The individual features provided by the system are storage, retrieval, and search capabilities over all general request and sample analysis information, automatic method selection for all process streams, automation of all method calculations, automatic assignment of bias and precision estimates at all analysis levels, with-method-use requalification, untrained or unqualified analyst method lockout, statistical testing of all process stream results for replicate agreement, automatic testing of process results against pre- established operating, safety, or failure limits at varying confidence levels, and automatic transfer and report of all analysis data plus all statistical testing to the Production Department.

Hand, R.L.

1990-12-31T23:59:59.000Z

455

General Counsel`s office FY 1995 site support program plan WBS 6.10.5  

SciTech Connect (OSTI)

The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

Moreno, S.R.

1994-09-01T23:59:59.000Z

456

National Security Technology Incubator Operations Plan  

SciTech Connect (OSTI)

This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

None

2008-04-30T23:59:59.000Z

457

The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145  

SciTech Connect (OSTI)

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance with the international guidance being developed. International guidance currently under development may suggest that the inter-generational equity principle strives to warn the future, however, in doing so not to unduly burden present generations. Building markers and monuments that are out of proportion to the risk being presented to the future is not in keeping with generational equity. With this in mind the DOE/CBFO is developing conceptual plans for re-evaluating and revising the current WIPP PIC's program. These conceptual plans will suggest scientific and technical work that must be completed to develop a 'new' PICs program that takes the best ideas of the present plan, blended with new ideas from the RK and M project, and proposed alternative permanent markers designs and materials in consideration. (authors)

Patterson, Russ [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Klein, Thomas [URS-Professional Solutions, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [URS-Professional Solutions, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Van Luik, Abraham [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)

2013-07-01T23:59:59.000Z

458

SAMPLING AND ANALYSIS PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

Littleton, CO 80127 #12;CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 SAMPLING Environmental Consultants, Inc. Approved By: Date: Sally Cuffin Project Quality Assurance Manager New Horizons...................................................................................................................................3 2.5 Decision Rules

459

Quality Assurance | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNewsCenter forQuality Assurance Is A Key Focus

460

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

Note: This page contains sample records for the topic "assurance program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

462

Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program  

SciTech Connect (OSTI)

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: • Maintain the data record at the fixed ARM sites for at least the next five years. • Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. • Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. • Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. • Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. • Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. • Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM’s Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

TP Ackerman; AD Del Genio; RG Ellingson; RA Ferrare; SA Klein; GM McFarquhar; PJ Lamb; CN Long; J Verlinde

2004-10-30T23:59:59.000Z

463

Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources  

E-Print Network [OSTI]

v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: · Education. These factsheets and publications are selected to supplement

Guiltinan, Mark

464

Review of the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education and State Agencies  

E-Print Network [OSTI]

This report provides a concise review of the Energy Systems Laboratory's experience in evaluating the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education & State Agencies (Texas Health...

Claridge, D. E.; Haberl, J. S.; Yazdani, B. L.; Zilbershtein, G.

2013-01-01T23:59:59.000Z

465

Quality Assurance Exchange, January 2007  

Broader source: Energy.gov (indexed) [DOE]

third article of this series (Quality Assurance Exchange June, volume 2, Issue 2), the bulk of the comments derived from the factual accuracy review should be editorial. When...

466

OIA: Office of Contractor Assurance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for science, best management practices, and continuous improvement are achieved at LBNL. The OCA is an internal independent assurance organization, and is authorized to have...

467

Quality Assurance Exchange August 2011  

Office of Environmental Management (EM)

Editor: Debbie Rosano: 301-903-8177, debbie.rosano@hq.doe.gov Quality Assurance Web site: www.hss.energy.govnuclearsafetyqa Questions or Comments? Please submit to...

468

International Quality Assurance Standards (Presentation)  

SciTech Connect (OSTI)

Tests to make quantitative predictions about photovoltaic (PV) modules are needed. This presentation proposes the creation of international quality assurance standards for PV modules.

Kurtz, S.; Hacke, P.; Wohlgemuth, J.; Kempe, M.; Yamamichi, M.

2011-02-01T23:59:59.000Z

469

Quality Assurance Exchange, March 2006  

Broader source: Energy.gov (indexed) [DOE]

on Performing Assessments: Auditing Tools & Techniques 1 Lessons Learned: Quality Assurance Related to Fastener Torque Requirements 2 Washington Closure Hanford Safety Software...

470

SRS ES and H Standards Compliance Program Implementation Plan. Revision 1  

SciTech Connect (OSTI)

On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB`s initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs.

Hearn, W.H.

1993-09-08T23:59:59.000Z

471

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan  

SciTech Connect (OSTI)

The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

2000-09-01T23:59:59.000Z

472

Advanced Materials Development Program: Ceramic Technology for Advanced Heat Engines program plan, 1983--1993  

SciTech Connect (OSTI)

The purpose of the Ceramic Technology for Advanced Heat Engines (CTAHE) Project is the development of an industrial technology base capable of providing reliable and cost-effective high temperature ceramic components for application in advanced heat engines. There is a deliberate emphasis on industrial'' in the purpose statement. The project is intended to support th