National Library of Energy BETA

Sample records for assurance program plan

  1. Quality Assurance Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Program Plan Quality Assurance Program Plan The achievement of quality in LM activities and products requires implementation of a formal Quality Assurance (QA) Program. This program establishes principles, requirements, practices, and methods for integrating quality into the daily operations of our programs and projects. The QA Program functions as a management tool to ensure that quality objectives are achieved throughout LM's technical, administrative, and operational

  2. Solid Waste Assurance Program Implementation Plan

    SciTech Connect (OSTI)

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  3. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect (OSTI)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  4. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  5. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect (OSTI)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  6. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  7. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect (OSTI)

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  8. Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

    SciTech Connect (OSTI)

    Sattison, Martin B.; Wierman, Thomas E.; Vedros, Kurt G.; Germain, Shawn W. St.; Eide, Steven A.; Sant, Robert L.

    2009-07-01

    The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRAs Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

  9. Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2002-03-01

    The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

  10. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  11. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Newsom, H.C.

    1999-01-24

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted.

  12. Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator Programs

    SciTech Connect (OSTI)

    Gabriel, D. M.; Miller, G. D.; Bohne, W. A.

    1995-03-16

    The purpose of this document is to serve as the Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator (HS/RTG) programs performed at EG&G Mound Applied Technologies. As such, it identifies and describes the systems and activities in place to support the requirements contained in DOE Order 5700.6C as reflected in MD-10334, Mound Quality Policy and Responsibilities and the DOE/RPSD supplement, OSA/PQAR-1, Programmatic Quality Assurance Requirements for Space and Terrestrial Nuclear Power Systems. Unique program requirements, including additions, modifications, and exceptions to these quality requirements, are contained in the appendices of this plan. Additional appendices will be added as new programs and activities are added to Mound's HS/RTG mission assignment.

  13. Analytical Chemistry Laboratory Quality Assurance Project Plan for the Transuranic Waste Characterization Program

    SciTech Connect (OSTI)

    Sailer, S.J.

    1996-08-01

    This Quality Assurance Project Plan (QAPJP) specifies the quality of data necessary and the characterization techniques employed at the Idaho National Engineering Laboratory (INEL) to meet the objectives of the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) requirements. This QAPJP is written to conform with the requirements and guidelines specified in the QAPP and the associated documents referenced in the QAPP. This QAPJP is one of a set of five interrelated QAPjPs that describe the INEL Transuranic Waste Characterization Program (TWCP). Each of the five facilities participating in the TWCP has a QAPJP that describes the activities applicable to that particular facility. This QAPJP describes the roles and responsibilities of the Idaho Chemical Processing Plant (ICPP) Analytical Chemistry Laboratory (ACL) in the TWCP. Data quality objectives and quality assurance objectives are explained. Sample analysis procedures and associated quality assurance measures are also addressed; these include: sample chain of custody; data validation; usability and reporting; documentation and records; audits and 0385 assessments; laboratory QC samples; and instrument testing, inspection, maintenance and calibration. Finally, administrative quality control measures, such as document control, control of nonconformances, variances and QA status reporting are described.

  14. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Admin Chg 2, dated 5-8-13, Admin Chg 1.

  15. EM Quality Assurance Centralized Training Platform Project Plan for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009-2010 | Department of Energy Program Management » Quality Assurance » EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 More Documents

  16. The ARRA EAP Energy Assurance Planning Bulletin

    Energy Savers [EERE]

    3, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 1 Need to Know DOE/OE National-Level Energy Assurance Conference Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Texas Home Weatherization Program is a Success Energy Assurance Success Stories Western Regional Energy Assurance Exercise Recap Other Useful Information and Links Introduction to Energy Infrastructure Interdependencies Cyber Security Concerns for LEAP

  17. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    This Guide provides information on principles, requirements, and practices used to establish and implement an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Admin Chg 1, dated 9-27-11. Admin Chg 2, dated 5-8-13.

  18. Quality Assurance Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-08-16

    The directive provides guidance for DOE elements and contractors in developing and implementing an effective Quality Assurance Program. Cancels DOE G 414.1-2A, DOE G 414.1-3 and DOE G 414.1-5. Superseded by Admin Chg 1, 9-27-11.

  19. SWiFT Software Quality Assurance Plan.

    SciTech Connect (OSTI)

    Berg, Jonathan Charles

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  20. Emergency Readiness Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-02-27

    To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

  1. Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

    Broader source: Energy.gov [DOE]

    Review protocol and lines of inquiry that are used as basis for technical review and approval of site-specific quality assurance programs.

  2. Quality Assurance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Quality Assurance Program Formal EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 1) to ensure all EM projects utilize a consistent quality assurance approach. PDF icon Quality Assurance Policy, Revision 1 PDF icon EM Quaility Assurance Program (EM-QA-001 Revision 1) More Documents & Publications EM Quality Assurance Program (EM-QA-001 Revision 1) EM Quality Assurance Program (EM-QA-001 Revision 0)

  3. State and Local Energy Assurance Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State and Local Energy Assurance Planning State and Local Energy Assurance Planning OE works closely with State and local governments on energy assurance issues. The office...

  4. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    SciTech Connect (OSTI)

    NONE

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project.

  5. Recovery Act: Local Energy Assurance Planning Initiatives | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Local Energy Assurance Planning Initiatives Recovery Act: Local Energy Assurance Planning Initiatives View Local Energy Assurance Planning Recipients - City Populations View Local Energy Assurance Planning Recipients - City Populations Read more View Local Energy Assurance Planning Recipients by City View Local Energy Assurance Planning Recipients by City Read more View the full list of Local Energy Assurance Planning Recipients Energy Secretary Steven Chu announced on February 19,

  6. The ARRA EAP Energy Assurance Planning Bulletin

    Energy Savers [EERE]

    JULY 9, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 3 Need to Know DOE/OE National Energy Assurance Conference Action Items Final Energy Assurance Plans and Reporting Deadlines News from the States California Approves Energy Efficiency Standards Energy Assurance Success Stories Heber Light & Power Takes Lead on Local EA Planning Upcoming Events NASEO/NARUC Environmental Protection & Clean, Reliable Energy Conference "Camp NARUC" GFIRST 2012 Conference

  7. Quality Assurance Program Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CURRENT DOE G 414.1-2B Admin Chg 2, Quality Assurance Program Guide by Colette Broussard Functional areas: Administrative Change, Quality Assurance and Oversight This Guide...

  8. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  9. Designing and Implementing Effective Performance Assurance Plans

    Broader source: Energy.gov [DOE]

    Presentationgiven at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting covers performance assurance planning and process, including performance-based contracts, and measurement and verification protocols.

  10. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  11. Waste Receipt Quality Assurance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receipt Quality Assurance Program About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual...

  12. October 2012 Energy Assurance Planning Bulletin Volume 3 No 4

    Energy Savers [EERE]

    OCTOBER 1, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 4 Need to Know Program Recap Action Items Quarterly and Project Close- Out Reports Due Energy Assurance Success Stories Portland, Oregon's Community-Wide Approach to Local Government Energy Assurance Planning News from the States North Carolina reaps benefits from SLEAP Upcoming Events GridWeek 2012 DOE Winter Fuels Outlook Conference ASERTTI Fall Meeting NMU "The Basics" Courses World Energy Engineering

  13. The ARRA EAP Energy Assurance Planning Bulletin

    Energy Savers [EERE]

    2, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 2 Need to Know DOE/OE National Energy Assurance Conference Action Items DOE Requests Sharing of State EA Plans Exercise and Reporting Deadlines Energy Assurance Success Stories West Virginia News from the States California is Top Renewable State Upcoming Events NMU "The Basics" Courses Smart Grid Customer Education Symposium National Town Meeting on Demand Response and Smart Grid Other Useful Information and Links PTI

  14. Assurances - Non-Construction Programs | Department of Energy

    Energy Savers [EERE]

    Assurances - Non-Construction Programs Assurances - Non-Construction Programs SF 424B, Assurances - Non-Construction Programs PDF icon Assurances - Non-Construction Programs More Documents & Publications Certifications and Assurances for Use with SF-424 National Policy Assurances to be Incorporated as Award Terms Microsoft Word - National Policy AssurancesAwardTermsREVJuly2005.doc

  15. Local Energy Assurance Planning: Map of Selected Cities | Department of

    Energy Savers [EERE]

    Energy Selected Cities Local Energy Assurance Planning: Map of Selected Cities Map of the United States showing the location and population size of cities selected for Local Energy Assurance Planning grants under the American Recovery and Reinvestment Act. PDF icon Local Energy Assurance Planning: Map of Selected Cities More Documents & Publications Local Energy Assurance Planning: Map of States with Number of Cities Selected Recovery Act Local Energy Assurance Planning (LEAP) Initiative

  16. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect (OSTI)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  17. Emergency Readiness Assurance Plans (ERAPs)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

  18. Waste Receipt Quality Assurance Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Receipt Quality Assurance Program About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Waste Receipt Quality Assurance Program Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The Hanford Site has a

  19. NMMSS Software Quality Assurance Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NMMSS Software Quality Assurance Plan NMMSS Software Quality Assurance Plan The Software Quality Assurance Plan (SQAP) for the Nuclear Materials Management and Safeguard System (NMMSS) software upgrade project (an actual DOE software development project) can be used as a template to facilitate the creation of the SQA plan for your particular project PDF icon NMMSS Software Quality Assurance Plan More Documents & Publications Configuration Management Plan Software Configuration Management

  20. EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014

    SciTech Connect (OSTI)

    Bush, Shane

    2014-09-01

    This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

  1. FUEL CYCLE TECHNOLOGIES QUALITY ASSURANCE PROGRAM DOCUMENT

    Broader source: Energy.gov [DOE]

    This Quality Assurance Program Document (QAPD) is the top-level quality policy and requirements document for the Fuel Cycle Technologies (FCT) program. The quality assurance (QA) requirements specified herein apply to Participants that manage and/or perform work within FCT Program.

  2. 2012 National Energy Assurance Planning Conference After-Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the...

  3. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 | Department of Energy The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training

  4. CERCLA Sites Quality Assurance Project Plan | Department of Energy

    Energy Savers [EERE]

    CERCLA Sites Quality Assurance Project Plan CERCLA Sites Quality Assurance Project Plan CERCLA Sites Quality Assurance Project Plan PDF icon CERCLA Sites Quality Assurance Project Plan More Documents & Publications Dispersivity Testing of Zero-Valent Iron Treatment Cells: Monticello, Utah, November 2005 Through February 2008 Closure Sites Performance of a Permeable Reactive Barrier Using Granular Zero-Valent Iron: FY 2004 Annual Report Durango, Colorado, Disposal

  5. The ARRA EAP Energy Assurance Planning Bulletin

    Energy Savers [EERE]

    4, 2010 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 1 Need to Know State Energy Assurance Guidelines Version 3.1 Action Items Update Contacts Recovery Act Report Quarterly Report Training Training Opportunities Upcoming Events February 2010 National Electricity Forum April 2010 Summer Energy Outlook and Energy Data Workshop Other Useful Links and Information Smart Grid Award Recipients DHS Crafts Cyber Preparedness Plan State Legislative Action Smart Grid Info OE Website Guidance

  6. 2010 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Improvement Project Plan 2010 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. PDF icon 2010 Quality Assurance

  7. 2012 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. PDF icon 2012 Quality Assurance

  8. 2014 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Quality Assurance Improvement Project Plan 2014 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. PDF icon 2014 Quality Assurance

  9. 2015 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Quality Assurance Improvement Project Plan 2015 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. PDF icon 2015 Quality Assurance

  10. 222-S laboratory quality assurance plan

    SciTech Connect (OSTI)

    Meznarich, H.K.

    1995-04-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client.

  11. Nuclear Waste Partnership (NWP) Quality Assurance Program Description...

    Office of Environmental Management (EM)

    Waste Partnership (NWP) Quality Assurance Program Description (QAPD) Nuclear Waste Partnership (NWP) Quality Assurance Program Description (QAPD) The documents included in this...

  12. Keys to Successful Quality Assurance and Quality Control Programs (101) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) January 28

  13. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Environmental Management (EM)

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) January 28...

  14. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

  15. Readiness Assurance

    National Nuclear Security Administration (NNSA)

    planning, resource allocation, program assistance activities, evaluations, training, drills, and exercises; and,

  16. Emergency Readiness Assurance Plans (ERAPs)<...

  17. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  18. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, January 3 2011, Volume 2 No. 1 | Department of Energy January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 2, NUMBER 1. For more information

  19. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, July 1 2010, Volume 1 No. 3 | Department of Energy 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 3. For more information about how OE

  20. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, July 1 2011, Volume 2 No. 3 | Department of Energy 1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 2, NUMBER 3. For more information about how OE

  21. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, October 3 2011, Volume 2 No. 4 | Department of Energy October 3 2011, Volume 2 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 2, NUMBER 4. For more information

  1. Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding

    Energy Savers [EERE]

    Opportunity Number: DE-FOA-0000098 | Department of Energy Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 Funding Opportunity Announcement and application details. PDF icon Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 More Documents & Publications DISCLAIMER: Microsoft Word -

  2. 2012 National Energy Assurance Planning Conference After-Action Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (August 2012) | Department of Energy Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the Department of Energy, in coordination with the National Association of State Energy Officials (NASEO), held the National Energy Assurance Planning Conference. The conference culminated three years of DOE's ongoing American Recovery and Reinvestment Act of 2009 (ARRA) State and

  3. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality ...

  4. SAPHIRE 8 Software Quality Assurance Plan

    SciTech Connect (OSTI)

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  5. State and Local Energy Assurance Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State and Local Energy Assurance Planning State and Local Energy Assurance Planning OE works closely with State and local governments on energy assurance issues. The office develops products and tools to inform and educate State and local officials to support their energy emergency response activities. This is done through forums, web-based training, and table top exercises for federal, State, and local energy officials to exchange and share information. OE also partners with State and local

  6. January 2012 ARRA Energy Assurance Planning Bulletin Available

    Broader source: Energy.gov [DOE]

    The Department released the January 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the ninth issue of the EAP Bulletin; previous issues are available for download.

  7. July 2012 ARRA Energy Assurance Planning Bulletin Available

    Broader source: Energy.gov [DOE]

    The Department released the July 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the eleventh issue of the EAP Bulletin; previous issues are available for download.

  8. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACT VOLUME 1, NUMBER 1 Need to Know State Energy Assurance Guidelines Version ... Grid Info OE Website Guidance from NASEO Know Your State's Energy Profile Get to Know ...

  9. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACT VOLUME 3, NUMBER 1 Need to Know DOEOE National-Level Energy Assurance ... Outlook Conference Guidance from PTI Know the Local Government Energy Profile Alice ...

  10. A Template for a Performance Assurance Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with the Task Order must be at the discretion of the Contracting Officer DOE FEMP's Minimal Performance Assurance Levels Recommendations The recommendations are as follows: 1. ...

  11. Quality Assurance for Residential Retrofit Programs

    Broader source: Energy.gov [DOE]

    This webinar covered quality assurance and how to assure that your investment achieves a desired result of saving energy.

  12. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  13. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect (OSTI)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  14. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I ~ r h b 1tv2om m ~ e e of Environments1M a ~ f p ~ ~ ! n n t (EM) Snbjeet: E M Quality Asamnee Program (QBP) Policies, Procedures, APPROVED: and Plans Principal Deputy Secretary for Environmental Management 1.0 PURPOSE AND OBJECTIVE The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP). The QAP is the EM management system to ensure we "do work correctly." The QAP meets the requirements

  15. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  16. Quality Assurance Plan, N springs expedited response action

    SciTech Connect (OSTI)

    Jackson, G.J.

    1994-07-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986).

  17. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  18. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    SciTech Connect (OSTI)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions applied to any specific task is proportional to, and appropriate for, the safety and/or project success significance of the task, as determined by the cognizant Technical Manager and the U.S. Home Team Quality Coordinator. In general, the research and development activities will have only those controls appropriate to ensure the quality of the manufacturing activity and validate the resultant data.

  19. EM Quality Assurance Program (EM-QA-001 Revision 1)

    Broader source: Energy.gov [DOE]

    The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP).

  20. Keys to Successful Quality Assurance and Quality Control Programs (101)

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Keys to Successful Quality Assurance and Quality Control Programs (101), call slides and discussion summary.

  1. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  2. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  3. Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1

    SciTech Connect (OSTI)

    NONE

    1997-04-14

    This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

  4. 242-A Evaporator quality assurance plan. Revision 2

    SciTech Connect (OSTI)

    Basra, T.S.

    1995-05-04

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.

  5. Near Facility Environmental Monitoring Quality Assurance Project Plan

    SciTech Connect (OSTI)

    MCKINNEY, S.M.

    2000-05-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

  6. The ARRA EAP Energy Assurance Planning Bulletin

    Energy Savers [EERE]

    1, 2010 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 2 Need to Know LEAP Grant Award Recipients Action Items Recovery Act Report Quarterly Report Plan Updates Contact Updates Upcoming Events April 2010 Energy Conference April 2010 Summer Energy Outlook and Energy Data Workshop Training GIS Webinar NASEO Conf. Calls Other Useful Links and Information FEMA's Lessons Learned Website NIST's Cyber Standards News from the States S.D. Ethanol Bill Energy Conference Locality Notes CARRI

  7. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Broader source: Energy.gov [DOE]

    Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we"do work correctly." This document has been superseded by Revision 1...

  8. DNFSB 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.2: Safety Quality Assurance Plan and Criteria for the Safety Analysis Toolbox Codes

    Office of Environmental Management (EM)

    EH-4.2.1.2-Criteria Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.2: Software Quality Assurance Plan and Criteria for the Safety Analysis Toolbox Codes U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 November 2003 Software Quality Assurance Criteria for Safety Analysis Codes November 2003 INTENTIONALLY BLANK ii Software Quality Assurance Criteria

  9. October 2011 Energy Assurance Planning Bulletin Volume 2 No 4

    Energy Savers [EERE]

    3, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 4 Need to Know Fourth DOE/OE Regional Tabletop Exercise Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Revolving Loan Funded Hydro Projects Help to Power Nevada Energy Assurance Success Stories Midwest Regional Exercise Recap Other Useful Information and Links New PTI Resources DOE/OE Year-in-Review: 2010 Report Upcoming Events Winter Fuels Outlook NARUC Annual Meeting

  10. Gas generation matrix depletion quality assurance project plan

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP).

  11. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 9, 2012, Volume 3 No. 3

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  12. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 2, 2012, Volume 3 No. 2

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  13. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  14. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  15. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  16. Security and Emergency Management Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-03-01

    Establishes the DOE Security and Emergency Management Independent Oversight and Performance Assurance Program. Cancels DOE O 470.2, Paragraph 5b(2) of DOE O 231.1 and Chapter IV of DOE M 231.1-1.

  17. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  18. Laboratory quality assurance and its role in the safeguards analytical laboratory evaluation (SALE) program

    SciTech Connect (OSTI)

    Delvin, W. L.; Pietri, C. E.

    1981-07-01

    Since the late 1960's, strong emphasis has been given to quality assurance in the nuclear industry, particularly to that part involved in nuclear reactors. This emphasis has had impact on the analytical chemistry laboratory because of the importance of analytical measurements in the certification and acceptance of materials used in the fabrication and construction of reactor components. Laboratory quality assurance, in which the principles of quality assurance are applied to laboratory operations, has a significant role to play in processing, fabrication, and construction programs of the nuclear industry. That role impacts not only process control and material certification, but also safeguards and nuclear materials accountability. The implementation of laboratory quality assurance is done through a program plan that specifies how the principles of quality assurance are to be applied. Laboratory quality assurance identifies weaknesses and deficiencies in laboratory operations and provides confidence in the reliability of laboratory results. Such confidence in laboratory measurements is essential to the proper evaluation of laboratories participating in the Safeguards Analytical Laboratory Evaluation (SALE) Program.

  19. Quality assurance project plan for the radionuclide airborne emissions for the Plutonium Finishing Plant

    SciTech Connect (OSTI)

    Kristofzski, J.G.; Alison, D.

    1992-04-01

    The information provided in this document meets the quality assurance (QA) requirements for the National Emission Standards for Hazardous Air Pollutants'' (NESHAP) (EPA 1989a) radionuclide airborne emissions control program in accordance with the regulation's referenced stack monitoring method (i.e. Method 114) for the Plutonium Finishing Plant (PFP). At the Hanford Site, the operations personnel have primary responsibility for implementing the continuous radionuclide emission measurements in conformance with NESHAP. Continuous measurement is used to describe continuous sampling of the effluent stream withdrawn and subjected to radiochemical analysis, and monitoring of radionuclide particulate emissions for administrative control. This Quality Assurance Project Plan (QAPjP) fully describes these PFP- implemented activities and the associated QA program as required by the NESHAP. The information is provided in the format specified in QAMS/005, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (EPA 1983a). This QAPjP describes the QA program for only those activities that are the responsibility of the PFP: operation, calibration, and maintenance of the sampling systems. The QA requirements for laboratory services, data compilation, and data reporting are beyond the scope of this QAPjP.

  20. Quality assurance project plan for the radionuclide airborne emissions for the Plutonium Finishing Plant

    SciTech Connect (OSTI)

    Kristofzski, J.G.; Alison, D.

    1992-04-01

    The information provided in this document meets the quality assurance (QA) requirements for the ``National Emission Standards for Hazardous Air Pollutants`` (NESHAP) (EPA 1989a) radionuclide airborne emissions control program in accordance with the regulation`s referenced stack monitoring method (i.e. Method 114) for the Plutonium Finishing Plant (PFP). At the Hanford Site, the operations personnel have primary responsibility for implementing the continuous radionuclide emission measurements in conformance with NESHAP. Continuous measurement is used to describe continuous sampling of the effluent stream withdrawn and subjected to radiochemical analysis, and monitoring of radionuclide particulate emissions for administrative control. This Quality Assurance Project Plan (QAPjP) fully describes these PFP- implemented activities and the associated QA program as required by the NESHAP. The information is provided in the format specified in QAMS/005, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (EPA 1983a). This QAPjP describes the QA program for only those activities that are the responsibility of the PFP: operation, calibration, and maintenance of the sampling systems. The QA requirements for laboratory services, data compilation, and data reporting are beyond the scope of this QAPjP.

  1. Local Energy Assurance Planning: Map of States with Number of Cities

    Energy Savers [EERE]

    Selected | Department of Energy States with Number of Cities Selected Local Energy Assurance Planning: Map of States with Number of Cities Selected Map of the United States identifying the States with cities selected for Local Energy Assurance Planning grants and the number of cities selected within those States under the American Recovery and Reinvestment Act. PDF icon Local Energy Assurance Planning: Map of States with Number of Cities Selected More Documents & Publications Local

  2. LFRG Program Management Plan

    Broader source: Energy.gov [DOE]

    The purpose of the EM  Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

  3. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the ...

  4. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    SciTech Connect (OSTI)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports.

  5. Independent Oversight and Performance Assurance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-10-31

    The Independent Oversight Program is designed to enhance the DOE safeguards and security; cyber security; emergency management; and environment, safety, and health programs by providing DOE and contractor managers, Congress, and other stakeholders with an independent evaluation of the adequacy of DOE policy and the effectiveness of line management performance in safeguards and security; cyber security; emergency management; environment, safety, and health; and other critical functions as directed by the Secretary. Cancels DOE O 470.2A and Attachment 2 of DOE O 414.1A. Canceled by DOE O 227.1.

  6. A Basic Guide to EM's Quality Assurance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management » Quality Assurance » A Basic Guide to EM's Quality Assurance Program A Basic Guide to EM's Quality Assurance Program Brief booklet discussion of highlights from the EM Corporate Quality Assurance Program (based on Revision 0 of the program). PDF icon A Basic Guide to EM's Quality Assurance Program More Documents & Publications SOPP-43, EM-23 Quality Assurance Oversight Protocol for EM Review/Field Self-Assessment of Site-Specific QAPs/QIPs Protocol for EM Review/Field

  7. Quality Assurance Project Plan for radioactive airborne emissions data compilation and reporting

    SciTech Connect (OSTI)

    Burris, S.A.; Thomas, S.P.

    1994-02-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling data from radioactie aiborne emissions. These data will be reported to the US Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Hanford Site radioactive airborne emissions are reported to the US Environmental Protection Agency in compliance with Title 40, Protection of the Environment, Code of Federal Regulations, Part 61, ``National Emissions Standards for Hazardous Air Pollutants , ``Subpart H, ``National Emissions Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities`` (EPA 1989a). Reporting to US Department of Energy is performed in compliance with requirements of US Department of Energy Order 5400.1, General Environmental Protection Program (DOE 1988a).

  8. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-01-16

    To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Canceled by DOE O 5700.6A, dated 7-21-1981.

  9. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-07-21

    To provide Department of Energy (DOE) policy, set forth principles, and assign responsibilities for establishing, implementing, and maintaining programs of plans and actions to assure quality achievement in DOE programs. Cancels DOE O 5700.6, dated 1-16-1981. Canceled by DOE O 5700.6B, dated 9-23-1986.

  10. Multicenter Collaborative Quality Assurance Program for the Province of Ontario, Canada: First-Year Results

    SciTech Connect (OSTI)

    Ltourneau, Daniel; Department of Radiation Oncology, University of Toronto, Toronto, Ontario ; McNiven, Andrea; Department of Radiation Oncology, University of Toronto, Toronto, Ontario ; Jaffray, David A.; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Department of Medical Biophysics, University of Toronto, Toronto, Ontario

    2013-05-01

    Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreement was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.

  11. Global Threat Reduction Initiative Fuel-Thermo-Physical Characterization Project Quality Assurance Plan

    SciTech Connect (OSTI)

    Pereira, Mario M.; Slonecker, Bruce D.

    2012-06-01

    The charter of the Fuel Thermo-Physical Characterization Project is to ready Pacific Northwest National Laboratory (PNNL) facilities and processes for the receipt of unirradiated and irradiated low enriched uranium (LEU) molybdenum (U-Mo) fuel element samples, and to perform analysis to support the Global Threat Reduction Initiative conversion program. PNNLs support for the program will include the establishment of post-irradiation examination processes, including thermo-physical properties, unique to the U.S. Department of Energy laboratories. These processes will ultimately support the submission of the base fuel qualification (BFQ) to the U.S. Nuclear Regulatory Commission (NRC) and revisions to High Performance Research Reactor Safety Analysis Reports to enable conversion from highly enriched uranium to LEU fuel. This quality assurance plan (QAP) provides the quality assurance requirements and processes that support the NRC BFQ. This QAP is designed to be used by project staff, and prescribes the required management control elements that are to be met and how they are implemented. Additional controls are captured in Fuel Thermo-Physical Characterization Project plans, existing procedures, and procedures to be developed that provide supplemental information on how work is conducted on the project.

  12. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  13. Quality Assurance Program Application for the Component Test Capability

    SciTech Connect (OSTI)

    Stephanin L. Austad

    2009-06-01

    This paper documents the application of quality requirements to Component Test Capability (CTC) Project activities for each CTC alternative. Four alternatives are considered for quality program application: do nothing, vendor testing, existing testing facility modification, and Component Test Facility. It also describes the advantages and disadvantages of using the existing Next Generation Nuclear Plant Quality Program Plan with CTC modifications versus a stand-alone CTC Quality Program Plan.

  14. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  15. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  16. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  17. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  18. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 4, 2010, Volume 1 No. 1

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  19. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  20. TWRS safety program plan

    SciTech Connect (OSTI)

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their location in the organization.

  1. Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Quality Assurance PPPO's Quality Assurance (QA) program effectively and efficiently implements DOE Environmental Management (EM) QA and oversight policies/requirements across the PPPO organization and among its contractors. The EM QA program describes the methods by which QA is implemented into the Integrated Safety Management System (ISMS), Contractor Assurance System (CAS), and the overall work processes conducted on EM's projects. PPPO uses approved QA procedures, plans, and

  2. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  3. Quality assurance management plan (QAPP) special analytical support (SAS)

    SciTech Connect (OSTI)

    LOCKREM, L.L.

    1999-05-20

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  4. Quality Assurance of ARM Program Climate Research Facility Data

    SciTech Connect (OSTI)

    Peppler, RA; Kehoe, KE; Sonntag, KL; Bahrmann, CP; Richardson, SJ; Christensen, SW; McCord, RA; Doty, DJ; Wagener, Richard; Eagan, RC; Lijegren, JC; Orr, BW; Sisterson, DL; Halter, TD; Keck, NN; Long, CN; Macduff, MC; Mather, JH; Perez, RC; Voyles, JW; Ivey, MD; Moore, ST; Nitschke, DL; Perkins, BD; Turner, DD

    2008-03-01

    This report documents key aspects of the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) data quality assurance program as it existed in 2008. The performance of ACRF instruments, sites, and data systems is measured in terms of the availability, usability, and accessibility of the data to a user. First, the data must be available to users; that is, the data must be collected by instrument systems, processed, and delivered to a central repository in a timely manner. Second, the data must be usable; that is, the data must be inspected and deemed of sufficient quality for scientific research purposes, and data users must be able to readily tell where there are known problems in the data. Finally, the data must be accessible; that is, data users must be able to easily find, obtain, and work with the data from the central repository. The processes described in this report include instrument deployment and calibration; instrument and facility maintenance; data collection and processing infrastructure; data stream inspection and assessment; the roles of value-added data processing and field campaigns in specifying data quality and haracterizing the basic measurement; data archival, display, and distribution; data stream reprocessing; and engineering and operations management processes and procedures. Future directions in ACRF data quality assurance also are presented.

  5. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    SciTech Connect (OSTI)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  6. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  7. The Soils and Groundwater EM-20 S&T Roadmap Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  8. EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OFFICE OF ENVIRONMENTAL MANAGEMENT QUALITY ASSURANCE IMPROVEMENT INITIATIVE EM CENTRALIZED TRAINING PLATFORM PROJECT PLAN Prepared by: Date: Approved by: Date: Revision 0 Page 3 of 30 05/11/09 1.0 INTRODUCTION The Department of Energy (DOE) expertise in quality assurance (QA) has degraded significantly over the last 10 years due to workforce attrition and the lack of emphasis on QA principles. Since the 2007 establishment and subsequent implementation of the Office of Environmental Management

  9. Risk assessment in the DOE Assurance Program for Remedial Action

    SciTech Connect (OSTI)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

  10. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  11. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The Department of Energy's (DOE) Advanced Combustion Systems program is conducted under the Clean Coal Research Program (CCRP). DOE's overarching mission is to increase the energy ...

  12. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  13. Lawrence Livermore National Laboratory Quality Assurance Project Plan for National Emission Standards for Hazardous Air Pollutants (NESHAPs), Subpart H

    SciTech Connect (OSTI)

    Hall, L.; Biermann, A

    2000-06-27

    As a Department of Energy (DOE) Facility whose operations involve the use of radionuclides, Lawrence Livermore National Laboratory (LLNL) is subject to the requirements of 40 CFR 61, the National Emission Standards for Hazardous Air Pollutants (NESHAPs). Subpart H of this Regulation establishes standards for exposure of the public to radionuclides (other than radon) released from DOE Facilities (Federal Register, 1989). These regulations limit the emission of radionuclides to ambient air from DOE facilities (see Section 2.0). Under the NESHAPs Subpart H Regulation (hereafter referred to as NESHAPs), DOE facilities are also required to establish a quality assurance program for radionuclide emission measurements; specific requirements for preparation of a Quality Assurance Program Plan (QAPP) are given in Appendix B, Method 114 of 40 CFR 61. Throughout this QAPP, the specific Quality Assurance Method elements of 40 CFR 61 Subpart H addressed by a given section are identified. In addition, the US Environmental Protection Agency (US EPA) (US EPA, 1994a) published draft requirements for QAPP's prepared in support of programs that develop environmental data. We have incorporated many of the technical elements specified in that document into this QAPP, specifically those identified as relating to measurement and data acquisition; assessment and oversight; and data validation and usability. This QAPP will be evaluated on an annual basis, and updated as appropriate.

  14. UC Assurance Plan For Lawrence Berkeley National Laboratory July2007

    SciTech Connect (OSTI)

    Chernowski, John

    2007-07-09

    This Division ES&H Self-Assessment Manual describes how the Laboratory administers a division self-assessment program that conforms to the institutional requirements promulgated in the 'LBNL Environment, Safety and Health Self-Assessment Program' (LBNL/PUB-5344, latest revision). The institutional program comprises all appraisal and reporting activities that identify environmental, safety, and health deficiencies and associated corrective actions. It is designed to meet U.S. Department of Energy (DOE) requirements for self-assessment. Self-assessment is a continuous process of information gathering and evaluation. A division selfassessment program should describe methods for gathering and documenting information, and methods to analyze these performance data to identify trends and root causes and their corrections.

  15. 2012 National Energy Assurance Planning Conference After-Action Report (August 2012)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability National Association of State Energy Officials ii | P a g e Table of Contents I. Purpose & Objectives ............................................................................................................ 1 II. Participants

  16. Central Characterization Program (CCP) Transuranic Waste Characterizat...

    Office of Environmental Management (EM)

    Characterization Quality Assurance Project Plan Central Characterization Program (CCP) Transuranic Waste Characterization Quality Assurance Project Plan This document was used to...

  17. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  18. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In addition, the LDRD Program Manager works with Division Offices and the Chief Financial ... Directors of the Engineering and Theory Divisions, and the laboratory's Head of ...

  19. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In addition, the LDRD Program Manager works with Division Offices and the Chief Financial ... Physics, Engineering, FEL and Theory, and the laboratories Chief Information Officer. ...

  20. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In addition, the LDRD Program Manager works with Division Offices and the Chief Financial ... Directors of the Engineering and Theory Divisions, and the laboratorys Chief ...

  1. A process for establishing a financial assurance plan for LLW disposal facilities

    SciTech Connect (OSTI)

    Smith, P.

    1993-04-01

    This document describes a process by which an effective financial assurance program can be developed for new low-level radioactive waste (LLW) disposal facilities. The report identifies examples of activities that might cause financial losses and the types of losses they might create, discusses mechanisms that could be used to quantify and ensure against the various types of potential losses identified and describes a decision process to formulate a financial assurance program that takes into account the characteristics of both the potential losses and available mechanisms. A sample application of the concepts described in the report is provided.

  2. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  3. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  4. Monitoring Plan for Weatherization Assistance Program, State...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance ...

  5. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    SciTech Connect (OSTI)

    Farnham, Irene; Krenzien, Susan

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  6. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    SciTech Connect (OSTI)

    Krenzien, Susan; Farnham, Irene

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participants requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  7. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  8. Energy Assurance Technical Training and Awareness Program/Energy Infrastructure Training and Analysis Center

    SciTech Connect (OSTI)

    Barbara McCabe

    2005-11-15

    This report covers the work completed during Year One (Year One has a 16 month project period) of a five- year Cooperative Agreement (DE-FC26-03NT41895) between the International Union of Operating Engineers (IUOE) National Hazmat Program (OENHP) and the U. S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). This final technical report is being submitted, as required by the Cooperative Agreement, within 90 (calendar) days after the project period ends (December 31, 2004). The resources allocated to Year One of the Cooperative Agreement were adequate for the completion of the required deliverables. All deliverables have been completed and sent to AAD Document Control as directed in the cooperative agreement. The allocation for Year One required 20-25 trainers to be trained in each of five Train-the-Trainer courses and a total of 6,000 workers trained throughout the country. Through cost savings employed for the scheduling and conduct of Train-the-Trainer, instructor refreshers, and direct training classes, 3171 workers have been trained to date. This total incorporates 159 trainers and members from management, local, county, state and federal organizations identified in the Strategic Plan. The largest percentage of personnel trained is heavy equipment operators, and building engineers, which is the largest targeted population identified under this cooperative agreement. The OENHP, using existing curriculum as appropriate, has modified and developed new training modules that have been used to establish four different levels of training courses. The four courses are: (1) EA 500 Energy Assurance Train-the-Trainer, (2) EA 400 Energy Assurance Instructor Refresher, (3) EA 300 Energy Assurance, and (4) EA 100 Energy Assurance Awareness. Training modules cover topics, such as, but not limited to, facility vulnerability and vulnerability assessment, physical security- heating, ventilation, air conditioning, terrorism awareness, weapons of mass destruction, respiratory protection, and decontamination. All of the courses and training modules are described in detail in the ''Training Course and Module Description Catalog'', April 2004. The OENHP has developed a Compendium of reference materials, training demonstration/hands-on models, and is revising its student manual. Course and instructor evaluations and the input of a general Advisory Board and an Advisory Board made up of Stationary (Building) Engineers has provided direction for modification and improvement of the Energy Security (Assurance) Training Program. The OENHP has identified the target training population, IUOE Stationary (Building) Engineers as being the primary population and IUOE heavy equipment operators as also being a targeted population. The OENHP however, has also identified several applicable populations outside of its membership, such as the Transport Workers Union and special populations within its membership, such as IUOE Local Union 25 Maritime Division. During Year One, a redesigned web site and brochures have been developed to assist in promotion of the energy security (assurance) program and the benefits of its training courses.

  9. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  10. CEBAF - environmental protection program plan

    SciTech Connect (OSTI)

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  11. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  12. Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6

    SciTech Connect (OSTI)

    Marsha Keister

    2010-04-01

    The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

  13. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  14. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coal and Coal-Biomass to Liquids Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  15. Quality Assurance Plan for Field Activities at the Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Brandt, C.C.

    2002-02-28

    The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) has established a Natural and Accelerated Bioremediation Research (NABIR) program Field Research Center (FRC) for the U.S. Department of Energy (DOE) Office of Biological and Environmental Research. The FRC is located in Bear Creek Valley within the Y-12 Plant area of responsibility on DOE's Oak Ridge Reservation in Tennessee. The NABIR program is a long-term effort designed to increase the understanding of fundamental biogeochemical processes that would allow the use of bioremediation approaches for cleaning up DOE's contaminated legacy waste sites. The FRC provides a site for investigators in the NABIR program to conduct research and obtain samples related to in situ bioremediation. The FRC is integrated with existing and future laboratory and field research and provides a means of examining the biogeochemical processes that influence bioremediation under controlled small-scale field conditions. This Quality Assurance Plan (QAP) documents the quality assurance protocols for field and laboratory activities performed by the FRC staff. It supplements the requirements in the ORNL Nuclear Quality Assurance Program and the ESD Quality Assurance Program. The QAP addresses the requirements in Title 10 CFR, Part 830 Subpart A, ''Quality Assurance Requirements'', using a graded approach appropriate for Research and Development projects based on guidance from ''Implementation Guide for Quality Assurance Programs for Basic and Applied Research'' (DOE-ER-STD-6001-92). It also supports the NABIR FRC Management Plan (Watson and Quarles 2000a) which outlines the overall procedures, roles and responsibilities for conducting research at the FRC. The QAP summarizes the organization, work activities, and qualify assurance and quality control protocols that will be used to generate scientifically defensible data at the FRC. The QAP pertains to field measurements and sample collection conducted by the FRC to characterize the site and in support of NABIR-funded investigations at the FRC. NABIR investigators who collect their own samples or measurements at the FRC will be responsible for developing their own data quality assurance protocol. Notably, this QAP will be of direct benefit to NABIR investigators who will be provided with and use the documented quality data about the FRC to support their investigations.

  16. OREM Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mission » OREM Program Plan OREM Program Plan The Oak Ridge Office of Environmental Management's (OREM) Program Plan discusses the vision, goals, and strategy for 2014-2024. The document lists the eight goals that will direct the local EM program for the next decade. This document addresses OREM's: Vision Mission Core Values Perspective Goals Cleanup Strategy Programmatic Strategy PDF icon Oak Ridge Office of Environmental Management Program Plan More Documents & Publications OREM Hosts

  17. Waste Characterization Plan for the Hanford Site single-shell tanks. Appendix D, Quality Assurance Project Plan for characterization of single-shell tanks: Revision 3

    SciTech Connect (OSTI)

    Hill, J.G.; Winters, W.I.; Simpson, B.C. [Westinghouse Hanford Co., Richland, WA (United States); Buck, J.W.; Chamberlain, P.J.; Hunter, V.L. [Pacific Northwest Lab., Richland, WA (United States)

    1991-09-01

    This section of the single-shell tank (SST) Waste Characterization Plan describes the quality control (QC) and quality assurance (QA) procedures and information used to support data that is collected in the characterization of SST wastes. The section addresses many of the same topics discussed in laboratory QA project plans (QAPjP) (WHC 1989, PNL 1989) and is responsive to the requirements of QA program plans (QAPP) (WHC 1990) associated with the characterization of the waste in the SSTs. The level of QC for the project depends on how the data is used. Data quality objectives (DQOs) are being developed to support decisions made using this data. It must be recognized that the decisions and information related to this part of the SST program deal with the materials contained within the tank only and not what may be in the environment/area surrounding the tanks. The information derived from this activity will be used to determine what risks may be incurred by the environment but are not used to define what actual constituents are contained within the soil surrounding the tanks. The phases defined within the DQOs on this Waste Characterization Plan follow the general guidance of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) yet are pertinent to analysis of the contents of the tanks and not the environment.

  18. SEP Program Planning Template ("Program Planning Template") |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)

  19. A retrospective analysis for patient-specific quality assurance of volumetric-modulated arc therapy plans

    SciTech Connect (OSTI)

    Li, Guangjun; Wu, Kui; Peng, Guang; Zhang, Yingjie; Bai, Sen

    2014-01-01

    Volumetric-modulated arc therapy (VMAT) is now widely used clinically, as it is capable of delivering a highly conformal dose distribution in a short time interval. We retrospectively analyzed patient-specific quality assurance (QA) of VMAT and examined the relationships between the planning parameters and the QA results. A total of 118 clinical VMAT cases underwent pretreatment QA. All plans had 3-dimensional diode array measurements, and 69 also had ion chamber measurements. Dose distribution and isocenter point dose were evaluated by comparing the measurements and the treatment planning system (TPS) calculations. In addition, the relationship between QA results and several planning parameters, such as dose level, control points (CPs), monitor units (MUs), average field width, and average leaf travel, were also analyzed. For delivered dose distribution, a gamma analysis passing rate greater than 90% was obtained for all plans and greater than 95% for 100 of 118 plans with the 3%/3-mm criteria. The difference (mean standard deviation) between the point doses measured by the ion chamber and those calculated by TPS was 0.9% 2.0% for all plans. For all cancer sites, nasopharyngeal carcinoma and gastric cancer have the lowest and highest average passing rates, respectively. From multivariate linear regression analysis, the dose level (p = 0.001) and the average leaf travel (p < 0.001) showed negative correlations with the passing rate, and the average field width (p = 0.003) showed a positive correlation with the passing rate, all indicating a correlation between the passing rate and the plan complexity. No statistically significant correlation was found between MU or CP and the passing rate. Analysis of the results of dosimetric pretreatment measurements as a function of VMAT plan parameters can provide important information to guide the plan parameter setting and optimization in TPS.

  20. Used Fuel Disposition Campaign Preliminary Quality Assurance...

    Energy Savers [EERE]

    Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary...

  1. Multiyear Program Plan Template - Phase II Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template Phase II Guidance June 30, 2006 Foreword: The Purpose and Value of a Multiyear Program Plan Multiyear Program Plans (MYPPs) are intended primarily to serve as operational guides for programs to manage their activities and as a source of information to help EERE management identify clear linkages between key program activities and progress toward goals. It is understood, however, that they are also read by a broad group of program stakeholders and may serve other

  2. Program Evaluation: Strategic Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Why, What, & When to Evaluate » Program Evaluation: Strategic Planning Program Evaluation: Strategic Planning One way to have useful and cost-effective evaluations is to strategically plan evaluation activity so it supports management activity cycles for planning, budgeting, analysis, program implementation, and benefits reporting and communication. In this way, evaluations generate information to feed into critical decision processes and continuous improvement. Planning evaluations

  3. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  4. The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-29

    Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

  5. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide PDF icon SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount Engine Plant Case Study Advanced Manufacturing Home Key Activities Research & Development Projects Facilities Technical Assistance Information Resources Financial Opportunities AMO Contacts News Events

  6. Quality Assurance Program Undergoes Sound Changes to Ensure Safe, Correct Work

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Completing the world’s largest nuclear cleanup safely and correctly is EM’s priority. In support of that central mission, EM recently made changes that strengthen its corporate quality assurance program, marking the first revisions to the quality program since EM established it in 2008. The program provides the foundation for achieving quality through a consistent approach to all mission-related work across the EM complex.

  7. Environmental Restoration Quality Program Plan

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  8. Oil program implementation plan FY 1996--2000

    SciTech Connect (OSTI)

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  9. Building Technologies Program: Planned Program Activities for 2008-2012

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Complete Multi-Year Program Plan 2008 includes all sections - overview, research and development, standards, technology validation, portfolio management, appendices.

  10. Water Power Program: Program Plans, Implementation, and Results

    Energy Savers [EERE]

    Water Power Program HOME ABOUT RESEARCH & DEVELOPMENT FINANCIAL OPPORTUNITIES INFORMATION RESOURCES NEWS EVENTS EERE Water Power Program About Key Activities Plans,...

  11. Light Water Reactor Sustainability Program - Integrated Program Plan |

    Office of Environmental Management (EM)

    Department of Energy Program - Integrated Program Plan Light Water Reactor Sustainability Program - Integrated Program Plan The Light Water Reactor Sustainability (LWRS) Program is a research and development (R&D) program sponsored by the U. S. Department of Energy (DOE), performed in close collaboration and cooperation with related industry R&D programs. The LWRS Program provides technical foundations for licensing and managing the long-term, safe, and economical operation of

  12. Enabling States and Localities to Improve Energy Assurance and Resiliency

    Energy Savers [EERE]

    Planning (September 2010) | Department of Energy Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) Enabling States and Localities to Improve Energy Assurance and Resiliency Planning (September 2010) The Energy Assurance Planning (EAP) Initiative for State and Local Governments is a major element of DOE's effort to improve the Nation's energy sector resiliency. The overall goal of the three-year program is to work toward a more uniform,

  13. LLNL Waste Minimization Program Plan

    SciTech Connect (OSTI)

    Not Available

    1990-02-14

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs.

  14. Wind Program: Program Plans, Implementation, and Results

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the...

  15. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  16. SAPHIRE 8 Software Quality Assurance Oversight

    SciTech Connect (OSTI)

    Kurt G. Vedros

    2011-09-01

    The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, 'New Features and Capabilities Overview'.

  17. HUD Choice Neighborhoods Planning Grants Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Housing and Urban Development (HUD) is accepting applications for the Choice Neighborhoods Planning Grant Program to leverage investments in public schools and education programs, early learning programs and services, and improved access to jobs.

  18. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect (OSTI)

    none,

    2010-10-01

    This document presents DOEs multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOEs 5-year plan for moving forward.

  19. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  20. Disposal phase experimental program plan

    SciTech Connect (OSTI)

    1997-01-31

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes.

  1. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  2. Program Execution Plan Mission Support Organizations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section 7.5, for a description of this system). 14 * Improvements Database * Lessons Learned database Several program and plans have been developed to describe how elements of...

  3. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to

  4. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  5. Audit of the Quality Assurance Program for the Control and Use of Measuring and Test Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QA001 Revision 0 Effective October 15, 2001 AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST EQUIPMENT Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-QA001 Revision 0 2 2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Audit Objectives

  6. Monitoring Plan for Weatherization Assistance Program, State Energy Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Energy Efficiency and Conservation Block Grants | Department of Energy Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Appendix of Compliance Checklists PDF icon appendix_compliance_checklists_102210.pdf More Documents & Publications WPN 16-4: Weatherization Assistance Program

  7. Quality Assurance Project Plan for the treatability study of in situ vitrification of Seepage Pit 1 in Waste Area Grouping 7 at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    NONE

    1995-07-01

    This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, using driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.

  8. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-29

    To establish an effective management system [i.e., quality assurance programs (QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Cancels DOE O 414.1.

  9. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    SciTech Connect (OSTI)

    Li, Taoran Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q.

    2015-01-15

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the systems performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the systems ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

  10. Light Water Reactor Sustainability Program: Integrated Program Plan |

    Office of Environmental Management (EM)

    Department of Energy Program: Integrated Program Plan Light Water Reactor Sustainability Program: Integrated Program Plan Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas- emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by more than 30% from 2009 to

  11. Program Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Peer Evaluation Reports Technical Publications Educational Publications Newsletter Program Presentations Multimedia Conferences & Meetings Webinars Data Records Databases Glossary...

  12. Integrated Safety Management in QA Program Planning

    Broader source: Energy.gov [DOE]

    Presenter: Sonya Barnette, Office of Quality Assurance Policy and Assistance, Office of Nuclear Safety, Quality Assurance and Environment Track 9-8

  13. Natural Gas Multi-Year Program Plan

    SciTech Connect (OSTI)

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  14. Fermilab | Directorate | Program Planning Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the future, by: Organizing and chairing weekly All Experimenters Meetings. Monitoring the progress of the program schedule implementation. Organizing and chairing Experiment...

  15. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual

    SciTech Connect (OSTI)

    C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

  16. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  17. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  18. Tank waste remediation system environmental program plan

    SciTech Connect (OSTI)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  19. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay Rhoderick, Co-Chair William E. Murphie, Co-Chair LFRG Members Joel Case, Idaho Operations Office Frank DiSanza, Nevada Operations Office Doug Hildebrand, Richland Operations Office Randy Janke, Ohio Field Office Bill McMillan, Oak Ridge Operations Office Virgil Sauls, Savannah River Operations Office Jim Orban,

  20. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    SciTech Connect (OSTI)

    Maxwell, D.R.

    1995-12-31

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations.

  1. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  2. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  3. State Energy Program Helps States Plan and Implement Energy Efficiency...

    Energy Savers [EERE]

    Helps States Plan and Implement Energy Efficiency State Energy Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program...

  4. Sample Business Plan Framework 1: A program seeking to continue...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sample Business Plan Framework 1: A program seeking to continue operations in the ... U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan ...

  5. Bioenergy Technologies Office Multi-Year Program Plan: November...

    Broader source: Energy.gov (indexed) [DOE]

    november2014.pdf More Documents & Publications Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update Bioenergy Technologies Office Multi-Year Program Plan:...

  6. Bioenergy Technologies Office Multi-Year Program Plan: November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2014 Update -- Sections Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals...

  7. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2014 Update -- Sections Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals and...

  8. CRAD, Self-Assessment Program Assessment Plan | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan ... assessment supports management's goal to protect people and the environment from harm. ...

  9. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  10. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  11. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  12. Building Technologies Program: Planned Activities for 2007-2012

    SciTech Connect (OSTI)

    None, None

    2007-01-01

    The multi-year program plan for the Building Technologies Program, for the years between 2007 and 2012.

  13. Headquarters Facilities Master Security Plan- Chapter 10, Security Awareness Program

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program Describes the DOE Headquarters Security Awareness Program

  14. Headquarters Facilities Master Security Plan- Chapter 8, Operations Security Program

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program Describes the DOE Headquarters Operations Security (OPSEC) Program.

  15. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect (OSTI)

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  16. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  17. Quality assurance project plan for the preliminary site investigation for McMurdo Station, Ross Island, Antarctica

    SciTech Connect (OSTI)

    Prasad, S.S.

    1991-05-01

    The quality assurance project plan (QAPjP) is designed to ensure that sampling and analysis activities are scoped and performed to obtain quality data during the preliminary site investigation for McMurdo Station, Ross Island, Antarctica. The QAPjP is prepared in accordance with the guidelines set forth and adopted by the US Environmental Protection Agency (EPA) (1980a, 1986a, 1989a), Argonne National Laboratory (ANL) (1988), and Pentecost and Doctor (1990). This document presents the final QAPjP for the preliminary site investigation. A drat version of this report was presented to the National Science Foundation (NSF) in January 1991. A description of the project and data quality objectives is provided in Section 3.1 of the work plan. Specific health and safety precautions and procedures are presented in the health and safety plan. 17 refs., 2 figs., 11 tabs.

  18. Multiyear Program Plan Template - Phase II Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template - Phase II Guidance Multiyear Program Plan Template - Phase II Guidance EERE template and guidance for program managers to develop multiyear plans, updated for 2006 PDF icon eere_guide_mypp_0606.pdf More Documents & Publications EERE Program Management Guide - Appendix A EERE Program Management Guide - Chapter 4 EERE Program Management Guide - Appendices A-Q

  19. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    SciTech Connect (OSTI)

    Evans, Susan Kay; Orchard, B. J.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

  20. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    SciTech Connect (OSTI)

    Evans, S.K.

    2002-01-31

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system.

  1. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program PDF icon Headquarters Facilities Work Planning and Control Program More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  2. Protection Programming Defensive Planning for Fixed Facilities

    Energy Savers [EERE]

    NOT MEASUREMENT SENSITIVE DOE STD-1207-2012 December 2012 DOE STANDARD Protection Program Defensive Planning For Fixed Facilities U.S. Department of Energy AREA SANS Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE STD-1207-2012 This Page Intentionally Left Blank ii DOE STD-1207-2012 TABLE OF CONTENTS

  3. Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan |

    Energy Savers [EERE]

    Department of Energy Program Plan Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan The NEAMS program plan includes information on the program vision, objective, scope, schedule and cost, management, development team and collaborations. PDF icon NEAMS Executive Program Plan.pdf More Documents & Publications NEAMS Quarterly Report April-June 2013 Nuclear Energy Advanced Modeling and Simulation (NEAMS) Software Verification and Validation (V&V) Plan Requirements

  4. Nuclear Safety Research and Development Program Operating Plan | Department

    Energy Savers [EERE]

    of Energy Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating plan outlines the mission, goals, and processes for the Department of Energy's (DOE) Nuclear Safety Research & Development (NSR&D) Program. This first version of the operating plan also discusses the startup phase of the program. NSR&D involves a systematic search for knowledge to advance the

  5. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  6. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. ETA-HQA01 - Audit of the Quality Assurance Program for the Control and Use of Measuring and Test Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HQA01 Revision 1 Effective November 1, 2004 AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST EQUIPMENT Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Roberta Brayer Approved by: _______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-HQA01 Revision 1 2 2004 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Audit Objectives

  8. ETA-NQA001 - Audit of the Quality Assurance Program for the Control and Use of Measuring and Test Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NQA001 Revision 0 Effective October 15, 2001 AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST EQUIPMENT Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-NQA001 Revision 0 2 2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Audit

  9. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  10. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  11. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2007-01-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  12. SU-E-T-546: Use of Implant Volume for Quality Assurance of Low Dose Rate Brachytherapy Treatment Plans

    SciTech Connect (OSTI)

    Wilkinson, D; Kolar, M

    2014-06-01

    Purpose: To analyze the application of volume implant (V100) data as a method for a global check of low dose rate (LDR) brachytherapy plans. Methods: Treatment plans for 335 consecutive patients undergoing permanent seed implants for prostate cancer and for 113 patients treated with plaque therapy for ocular melanoma were analyzed. Plaques used were 54 COMS (10 to 20 mm, notched and regular) and 59 Eye Physics EP917s with variable loading. Plots of treatment time x implanted activity per unit dose versus v100 ^.667 were made. V100 values were obtained using dose volume histograms calculated by the treatment planning systems (Variseed 8.02 and Plaque Simulator 5.4). Four different physicists were involved in planning the prostate seed cases; two physicists for the eye plaques. Results: Since the time and dose for the prostate cases did not vary, a plot of implanted activity vs V100 ^.667 was made. A linear fit with no intercept had an r{sup 2} = 0.978; more than 94% of the actual activities fell within 5% of the activities calculated from the linear fit. The greatest deviations were in cases where the implant volumes were large (> 100 cc). Both COMS and EP917 plaque linear fits were good (r{sup 2} = .967 and .957); the largest deviations were seen for large volumes. Conclusions: The method outlined here is effective for checking planning consistency and quality assurance of two types of LDR brachytherapy treatment plans (temporary and permanent). A spreadsheet for the calculations enables a quick check of the plan in situations were time is short (e.g. OR-based prostate planning)

  13. The Department of Energy Hydrogen and Fuel Cells Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan for the Research, Development, and Demonstration of Hydrogen and Fuel Cell Technologies September 2011 The...

  14. Mission Plan for the Civilian Radioactive Waste Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and...

  15. Program Plans, Implementation, and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About » Program Plans, Implementation, and Results Program Plans, Implementation, and Results The Building Technologies Office (BTO) carries out technology research, development, and market stimulation through an ongoing process of planning and analysis, implementation, and review. This page includes links to documents that guide, support, and document the program management process and associated results and public benefits. Program Overview Documents Building Technologies Office Overview

  16. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  17. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  18. Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program

    SciTech Connect (OSTI)

    Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

    2008-03-07

    The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energys (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 Quality Assurance Program under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as not applicable to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

  19. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect (OSTI)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  20. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Fuel Cell Technologies Publication and Product Library (EERE)

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

  1. Fusion Nuclear Science and Technology Program - Status and Plans...

    Office of Environmental Management (EM)

    Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and ... Idaho on September 23-25, 2014. PDF icon Fusion Nuclear Science and Technology Program - ...

  2. Fusion Nuclear Science and Technology Program - Status and plans...

    Office of Environmental Management (EM)

    plans for tritium research Fusion Nuclear Science and Technology Program - Status and ... New Jersey on May 05-07, 2015. PDF icon Fusion Nuclear Science and Technology Program - ...

  3. Office of Building Technology, State and Community Programs Strategic Plan

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    This is the strategic plan for the Building Technology Program in 1998. This describes trends in the BTP program and projects goals for the future.

  4. Better Buildings Neighborhood Program: Energy Efficiency Market Sustainable Business Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Energy Efficiency Market Sustainable Business Planning, October 25, 2011.

  5. BETO Announces Updated Multi-Year Program Plan

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office is pleased to announce the release of its newly updated Multi-Year Program Plan (MYPP).

  6. Wind Energy Multiyear Program Plan for 2007-2012

    SciTech Connect (OSTI)

    None

    2009-01-18

    Detailed plan for the Wind Energy Program's activities from 2007-1012, including goals, targets, and barriers.

  7. Multi-Year Program Plan | Department of Energy

    Office of Environmental Management (EM)

    Year Program Plan Multi-Year Program Plan The Department of Energy's Building Technologies Office's (BTO's) Multi-Year Program Plan (MYPP) for Fiscal Years 2016-2020 provides a broad overview of the energy use in the buildings sector, the opportunities for cost-effective energy savings, the barriers to their achievement, and BTO's strategies and goals for achieving significant reductions in building energy use intensity. The body of the plan describes each of BTO's programs, providing a roadmap

  8. Infrastructure Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assurance - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear Energy

  9. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-07-12

    To establish an effective management system [i.e., quality assurance programs(QAPs)] using the performance requirements of this Order, coupled with technical standards where appropriate. Change 1, dated 7/12/01, facilitates the Department's organizational transition necessitated by establishment of the NNSA. (Attachment 2 of this Order is canceled by DOE O 470.2B.) Cancels: DOE O 414.1

  10. Multi-Year Program Plan, Building Regulatory Programs: 2010-2015

    Broader source: Energy.gov [DOE]

    This Multi-Year Program Plan covers Building Regulatory Programs under the Office of Energy Efficiency and Renewable Energy, Building Technologies Program, and was published in October, 2010.

  11. Multi-Year Program Plan, Building Regulatory Programs: 2010-2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Program Plan - Building Regulatory Programs - U.S. Department of Energy - Energy Efficiency and Renewable Energy - Building Technologies Program - October 2010 This...

  12. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect (OSTI)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  13. Radiological Assistance Program Flight Planning Tool

    Energy Science and Technology Software Center (OSTI)

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this responsemore » time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.« less

  14. Radiological Assistance Program Flight Planning Tool

    SciTech Connect (OSTI)

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this response time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.

  15. Protection Program Defensive Planning for Fixed Facilities

    Energy Savers [EERE]

    STANDARD Protection Program Defensive Planning For Fixed Facilities U.S. Department of Energy AREA SANS Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE STD-1207-2012 December 2012 ──────────────── CHANGE NOTICE NO.1 SEPTEMBER 2015 DOE STD-1207-2012 This Page Intentionally Left Blank DOE STD-1207-2012 i ATTACHMENT 1 Change Notice No. 1 DOE STD-1207-2012 September 2015 Protection

  16. Programs Planning to Do Evaluations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs Planning to Do Evaluations Programs Planning to Do Evaluations Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations, Call Slides and Discussion Summary, August 2, 2012. PDF icon Call Slides and Discussion Summary More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Preliminary Process and Market Evaluation February 13, 2013 Webinar: Preliminary Process and

  17. ETA-HIQA01 - Audit of the Quality Assurance Program for the Control and Use of Measuring and Test Equipment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HIQA01 Revision 0 Effective May 1, 2004 AUDIT OF THE QUALITY ASSURANCE PROGRAM FOR THE CONTROL AND USE OF MEASURING AND TEST EQUIPMENT Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Roberta Brayer Approved by: _______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-HIQA01 Revision 0 2 2004 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Audit Objectives 3

  18. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  19. Characterization program management plan for Hanford K Basin spent nuclear fuel

    SciTech Connect (OSTI)

    Lawrence, L.A.

    1998-05-14

    The management plan developed to characterize the K Basin Spent Nuclear Fuel was revised to incorporate actions necessary to comply with the Office of Civilian Radioactive Waste Management Quality Assurance Requirements Document 0333P. This plan was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. This revision to the Program Management Plan replaces Westinghouse Hanford Company with Duke Engineering and Services Hanford, Inc., updates the various activities where necessary, and expands the Quality Assurance requirements to meet the applicable requirements document. Characterization will continue to utilize the expertise and capabilities of both organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for Duke Engineering and Services Hanford, Inc. and Pacific Northwest National Laboratory to support the Spent Nuclear Fuels Project at Hanford.

  20. Who's Evaluating What? Planned Program Evaluations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Peer Exchange Call, Who's Evaluating What? - Planned Program Evaluations, November 17, 2011. During this call participants shared their evaluation plans and initial results and discussed DOE and fellow programs' evaluation efforts. PDF icon Discussion Summary More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Preliminary Process and Market

  1. Evaluation of the International Atomic Energy Agency (IAEA) Safeguards Analytical Laboratory quality assurance program

    SciTech Connect (OSTI)

    Pietri, C.E.; Bracey, J.T.

    1985-02-01

    Destructive analysis is used by the International Atomic Energy Agency (IAEA) through its Safeguards Analytical Laboratory (SAL) to verify, in part, the inventory of nuclear materials at nuclear facilities. The reliability and quality of these meassurements must be assured in a systematic manner. The Division of Safeguards Evaluation, IAEA, required assistance in developing and implementing the quality assurance measures for the analytical procedures used in the destructive analysis of these safeguards samples. To meet these needs an ISPO POTAS Task D.53 was instituted in which consultants would review with IAEA staff the procedures used (or proposed) at SAL for the destructive analysis of safeguards samples and the statistical evaluation of the resulting measurement data at Headquarters. The procedures included analytical methods, qualtiy control measures, and the treatment of data from these activities. Based on this review, modifications to the system, if required, would be recommended which would provide routine assurance to management that these procedures are functioning properly to achieve safeguards objectives. In the course of this review, the sample handling procedures, measurement control activities, analytical methods, reference materials, calibration procedures, statistical analysis of data, and data management system were studied and evaluated. The degree to which SAL (as a total system) achieved laboratory quality assurance was assessed by comparison to accepted standards of quality assurance. 22 refs., 1 fig.

  2. Nuclear Fuels Storage and Transportation Planning Project (NFST) Program

    Office of Environmental Management (EM)

    Status | Department of Energy Fuels Storage and Transportation Planning Project (NFST) Program Status Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status Presentation made by Jeff Williams for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. PDF icon Nuclear Fuels Storage and Transportation Planning Project (NFST) Program Status More Documents & Publications Nuclear Fuel Storage and Transportation Planning Project Overview DOE Office of

  3. Building Technologies Program Planning Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Program Planning Summary Building Technologies Program Planning Summary This is a summary of the U.S. Department of Energy Building Technologies Program plans for conducting research and development of energy-efficient buildings in the United States. PDF icon btp_planning.pdf More Documents & Publications Before the Senate Energy and Natural Resources Committee Microsoft PowerPoint - 06 Crawley Drive for Net Zero Energy Commercial Buildings Before the House Transportation and

  4. Methodologies for estimating one-time hazardous waste generation for capacity generation for capacity assurance planning

    SciTech Connect (OSTI)

    Tonn, B.; Hwang, Ho-Ling; Elliot, S.; Peretz, J.; Bohm, R.; Hendrucko, B.

    1994-04-01

    This report contains descriptions of methodologies to be used to estimate the one-time generation of hazardous waste associated with five different types of remediation programs: Superfund sites, RCRA Corrective Actions, Federal Facilities, Underground Storage Tanks, and State and Private Programs. Estimates of the amount of hazardous wastes generated from these sources to be shipped off-site to commercial hazardous waste treatment and disposal facilities will be made on a state by state basis for the years 1993, 1999, and 2013. In most cases, estimates will be made for the intervening years, also.

  5. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  6. SU-E-P-05: Is Routine Treatment Planning System Quality Assurance Necessary?

    SciTech Connect (OSTI)

    Alaei, P

    2014-06-01

    Purpose: To evaluate the variation of dose calculations using a treatment planning system (TPS) over a two year period and assessment of the need for TPS QA on regular intervals. Methods: Two phantoms containing solid water and lung- and bone-equivalent heterogeneities were constructed in two different institutions for the same brand treatment planning system. Multiple plans, consisting of photons and electron beams, including IMRT and VMAT ones, were created and calculated on the phantoms. The accuracy of dose computation in the phantoms was evaluated at the onset by dose measurements within the phantoms. The dose values at up to 24 points of interest (POI) within the solid water, lung, and bone slabs, as well as mean doses to several regions of interest (ROI), were re-calculated over a two-year period which included two software upgrades. The variations in POI and ROI dose values were analyzed and evaluated. Results: The computed doses vary slightly month-over-month. There are noticeable variations at the times of software upgrade, if the upgrade involves remodeling and/or re-commissioning of the beams. The variations are larger in certain points within the phantom, usually in the buildup region or near interfaces, and are almost non-existent for electron beams. Conclusion: Routine TPS QA is recommended by AAPM and other professional societies, and is often required by accreditation organizations. The frequency and type of QA, though, is subject to debate. The results presented here demonstrate that the frequency of these tests could be at longer intervals than monthly. However, it is essential to perform TPS QA at the time of commissioning and after each software upgrade.

  7. Security Plan for the Energy Employees Occupational Illness Compensation Program

    Energy Savers [EERE]

    OFFICE OF HEALTH, SAFETY AND SECURITY SECURITY PLAN FOR THE ENERGY EMPLOYEES OCCUPATIONAL ILLNESS COMPENSATION PROGRAM S January 23, 2009 ______________________________________ __________ Glenn S. Podonsky Date Chief Health, Safety and Security Officer Office of Health, Safety and Security HSS Security Plan for EEOICPA January 2009 Security Plan for the Energy Employees Occupational Illness Compensation Program CONTENTS I. Background

  8. Monitoring Plan for Weatherization Assistance Program, State Energy Program, Energy Efficiency and Conservation Block Grants

    Energy Savers [EERE]

    American Recovery and Reinvestment Act Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants Revised: June 30, 2010 U.S. Department of Energy Office of Weatherization and Intergovernmental Program Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants Concurrences:

  9. Quality Assurance | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance Is A Key Focus At Jefferson Lab Quality assurance is a critical function at Jefferson Lab, protecting workers, lab facilities, the environment and the public. A D D I T I O N A L L I N K S: Quality Home Lessons Learned Quality Plan ESH&Q Home top-right bottom-left-corner bottom-right-corner Quality Assurance The Quality Assurance & Continuous Improvement Department has the critical role of working with the U.S. Department of Energy and other regulators on the

  10. QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1

    Broader source: Energy.gov [DOE]

    QUALITY ASSURANCE EXCHANGE July 2005 Volume 1 Issue 1 US Department of Energy, Office of Quality Assurance Programs (EH-31)

  11. FY97 Geothermal R&D Program Plan

    SciTech Connect (OSTI)

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  12. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect (OSTI)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  13. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    SciTech Connect (OSTI)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  14. DOE Mentoring Guidance and Program Plan | Department of Energy

    Energy Savers [EERE]

    Services » Learning and Workforce Development » Workforce Development » Leadership Development » DOE Mentoring Program » DOE Mentoring Guidance and Program Plan DOE Mentoring Guidance and Program Plan If you are interested in continuous learning and self-development, the DOE Mentoring Program is for you. This guide will provide you with general information regarding mentoring at DOE. Learning about the program is the first step to facilitate effective Mentor/Mentee partnerships. It is to be

  15. BATT Program- Summary and Future Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BATT Program- Summary and Future Plans BATT Program- Summary and Future Plans 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon es_42_srinivasan.pdf More Documents & Publications Overview of the Batteries for Advanced Transportation Technologies (BATT) Program Development of Electrolytes for Lithium-ion Batteries Development of Electrolytes for Lithium-ion Batteries

  16. WIPP Documents - Quality Assurance and Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quality Assurance and Safety Quality Assurance Program Document DOE/CBFO-94-1012 Rev. 12 Effective date: 8/15

  17. 2013 Annual Planning Summary for the Naval Nuclear Propulsion Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Naval Nuclear Propulsion Program 2013 Annual Planning Summary for the Naval Nuclear Propulsion Program The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Naval Nuclear Propulsion Program. PDF icon NNSA_NR_NEPA-APS-2013.pdf More Documents & Publications 2014 Annual Planning Summary for the West Valley Demonstration Project 2014 Annual Planning Summary for the Nevada Field Office 2012

  18. Draft Multi-Year Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Multi-Year Program Plan Draft Multi-Year Program Plan The Department of Energy's Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings over the next five years. We are seeking

  19. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  20. State Energy Program Strategic Plan for the 21st Century

    Broader source: Energy.gov [DOE]

    Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

  1. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Broader source: Energy.gov (indexed) [DOE]

    below or by individual sections. myppjuly2014.pdf More Documents & Publications Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update Bioenergy...

  2. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Broader source: Energy.gov (indexed) [DOE]

    aphymyppmarch2015.pdf appendixa-dmyppmarch2015.pdf More Documents & Publications Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update Bioenergy...

  3. Headquarters Facilities Master Security Plan- Chapter 12, Special Access Programs

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.

  4. DOE-ER-STD-6001-92; Implementation Guide for Quality Assurance Programs for Basic and applied Research

    Office of Environmental Management (EM)

    D9E-ER-STD--6001 -92 DE92 016352 DOE STANDARD IMPLEMENTATION GUIDE FOR QUALITY ASSURANCE PROGRAMS FOR BASIC AND APPLIED RESEARCH U.S. Department of Energy Washington, D.C. 20585 AREA-QCIC -~ This report has been reproduced directly from the best available copy. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161. DOE-ER-STD-6001-92 ACKNOWLEDGEMENT The Office of Energy Research (ER) wishes to acknowledge

  5. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  6. State Energy Program Strategic Plan: February 2007

    Broader source: Energy.gov [DOE]

    This strategic plan describes the challenges faced by the States and the four key goals established to meet those challenges.

  7. Federal Technical Capabilities Program (FTCP) 2005 Annual Plan

    Office of Environmental Management (EM)

    S. Department of Energy Federal Technical Capability Program Fiscal Year (FY) 2005 Annual Plan January 15, 2005 FTCP Annual Plan, FY 2005 INTRODUCTION The objective of the Federal Technical Capability Program (Program) is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the U.S. Department of Energy (also known as the "Department" or DOE) missions and responsibilities. The current Program was formalized in 1998

  8. Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Quality Assurance QUALITY ASSURANCE IN THE DEPARTMENT OF ENERGY When properly implemented, the principles and requirements form a management system to plan, perform, assess, and improve work. The requirements are performance oriented and offer implementation flexibility. The DOE quality management system moves beyond the traditional quality assurance requirements that had become narrowly focused on compliance, and inspections. The management system is designed to link with an

  9. Advanced Research Projects Agency - Energy Program Specific Recovery Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Research Projects Agency - Energy Program Specific Recovery Plan Advanced Research Projects Agency - Energy Program Specific Recovery Plan PDF icon Microsoft Word - 44F1801D.doc More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 Advanced Research Projects Agency -EnergyDepartment Audit Report: OAS-RA-11-11

  10. Bonneville Power Administration Program Specific Recovery Plan | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan PDF icon Microsoft Word - PSRP May 15 2009 _BPA_ Final.docx More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 Before the House Natural Resources Subcommittee on Water and Power Western Area Power Administration Borrowing Authority, Recovery Act

  11. Next Generation Nuclear Plant Materials Research and Development Program Plan

    SciTech Connect (OSTI)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for managing the R&D program elements; (2) Developing a specific work package for the R&D activities to be performed during each government fiscal year; (3) Reporting the status and progress of the work based on committed deliverables and milestones; (4) Developing collaboration in areas of materials R&D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and (5) Ensuring that the R&D work performed in support of the materials program is in conformance with established Quality Assurance and procurement requirements. The objective of the NGNP Materials R&D Program is to provide the essential materials R&D needed to support the design and licensing of the reactor and balance of plant, excluding the hydrogen plant. The materials R&D program is being initiated prior to the design effort to ensure that materials R&D activities are initiated early enough to support the design process and support the Project Integrator. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge; thus, new materials and approaches may be required.

  12. Fusion Nuclear Science and Technology Program - Status and Plans for

    Office of Environmental Management (EM)

    Tritium Research | Department of Energy Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Presentation from the 34th Tritium Focus Group Meeting held in Idaho Falls, Idaho on September 23-25, 2014. PDF icon Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research More Documents & Publications Tritium Operation Improvements at the Idaho National Laboratory (INL) Safety and Tritium Applied Research

  13. Program Evaluation: EERE Planned and Completed Evaluations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation » Information Resources » Program Evaluation: EERE Planned and Completed Evaluations Program Evaluation: EERE Planned and Completed Evaluations This section provides a list of past and planned evaluation reports for the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE). Many of the listed reports are available as downloads. The table below tells you which offices have reports accessible as downloads. A checked box in the table -

  14. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  15. State Energy Program Helps States Plan and Implement Energy Efficiency |

    Energy Savers [EERE]

    Department of Energy Helps States Plan and Implement Energy Efficiency State Energy Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program (SEP) provides grants and technical assistance to states and U.S. territories to promote energy conservation and reduce the growth of energy demand in ways that are consistent with national energy goals. PDF icon 48100_weather_sep_fsr3.pdf More Documents & Publications State Energy Program

  16. Operational Plan and Desktop Reference for the Veterans Employment Program

    Energy Savers [EERE]

    | Department of Energy Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites.

  17. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  18. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  19. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  20. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce; Bragg-Sitton, Shannon; Smith, Curtis; Barnard, Cathy

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  1. Bioenergy Technologies Office Multi-Year Program Plan: May 2013...

    Broader source: Energy.gov (indexed) [DOE]

    to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on...

  2. Characterization Program Management Plan for Hanford K Basin Spent Nuclear Fuel (SNF) (OCRWM)

    SciTech Connect (OSTI)

    BAKER, R.B.; TRIMBLE, D.J.

    2000-12-12

    The management plan developed to characterize the K Basin spent nuclear fuel (SNF) and sludge was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the SNF stored at the Hanford K Basins. The plan also addressed necessary characterization for the removal, transport, and storage of the sludge from the Hanford K Basins. This plan was revised in 1999 (i.e., Revision 2) to incorporate actions necessary to respond to the deficiencies revealed as the result of Quality Assurance surveillances and audits in 1999 with respect to the fuel characterization activities. Revision 3 to this Program Management Plan responds to a Worker Assessment resolution determined in Fical Year 2000. This revision includes an update to current organizational structures and other revisions needed to keep this management plan consistent with the current project scope. The plan continues to address both the SNF and the sludge accumulated at K Basins. Most activities for the characterization of the SNF have been completed. Data validation, Office of Civilian Radioactive Waste Management (OCRWM) document reviews, and OCRWM data qualification are the remaining SNF characterization activities. The transport and storage of K Basin sludge are affected by recent path forward revisions. These revisions require additional laboratory analyses of the sludge to complete the acquisition of required supporting engineering data. Hence, this revision of the management plan provides the overall work control for these remaining SNF and sludge characterization activities given the current organizational structure of the SNF Project.

  3. Program Evaluation: Planning and Conducting Evaluations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Planning and Conducting Evaluations Program Evaluation: Planning and Conducting Evaluations This area of the website takes you through step-by-step processes for planning and conducting the In-progress Peer Reviews and Impact Evaluations described on this website. In general, for each type of evaluation, this "how-to" section will help you to: Clarify your evaluation purpose, questions, and intended use, Consider appropriate methods for conducting the evaluation, Ensure that

  4. Light Water Reactor Sustainability Program- Integrated Program Plan

    Broader source: Energy.gov [DOE]

    The Light Water Reactor Sustainability (LWRS) Program is a research and development (R&D) program sponsored by the U. S. Department of Energy (DOE), performed in close collaboration and cooperation with related industry R&D programs. INL/EXT-11-23452 Revision 3

  5. Power Electronics Research and Development Program Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Electronics Research and Development Program Plan Power Electronics Research and Development Program Plan As the United States transitions to a digital economy, the need to upgrade the nation's aging electric grid is becoming increasingly evident. Electricity demand is projected to increase by 30% between 2008 and 2035,1 and the U.S. electricity delivery system must be able to meet this demand and ensure the continued supply of reliable, secure electricity. PDF icon Power Electronics

  6. Office of Electricity Delivery and Energy Reliability Recovery Program Plan

    Energy Savers [EERE]

    | Department of Energy Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan PDF icon Microsoft Word - OE PSRP June 5 2009 _OE_ Final.doc More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 Update to the 2008 EAC Report: "Smart Grid: Enabler of the New Energy Economy Report Recommendations" Microsoft Word - PSRP Updates 6-25-10_v2

  7. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2001-01-31

    The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP for boxed waste assay systems. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAOs). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the boxed waste PDP, a simulated waste container consists of a modified standard waste box (SWB) emplaced with radioactive standards and fabricated matrix inserts. An SWB is a waste box with ends designed specifically to fit the TRUPACT-II shipping container. SWBs will be used to package a substantial volume of the TRU waste for disposal. These PDP sample components are distributed to the participating measurement facilities that have been designated and authorized by the Carlsbad Field Office (CBFO). The NDA Box PDP materials are stored at these sites under secure conditions to protect them from loss, tampering, or accidental damage. Using removable PDP radioactive standards, isotopic activities in the simulated waste containers are varied to the extent possible over the range of concentrations anticipated in actual waste characterization situations. Manufactured matrices simulate expected waste matrix configurations and provide acceptable consistency in the sample preparation process at each measurement facility. Analyses that are required by the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with various regulatory requirements and that are included in the PDP may only be performed by measurement facilities that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes in this document.

  8. Program Development Plan and Team up

    SciTech Connect (OSTI)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  9. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  10. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  11. Performance Assurance for Multi-Year Contracts Under the Utility Incentive Program; Federal Energy Management Program (FEMP) Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Federal Energy Management Program Leading by example, saving energy and taxpayer dollars in federal facilities Fact Sheet Section 152(f) of the Energy Policy Act of 1992 (EPACT) Public Law 102-486 autho- rized and encouraged Federal agencies to participate in programs to increase energy efficiency and for water conservation or the management of electricity demand conducted by gas, water, or electric utili- ties. Additionally Title 10 Section 2913 and 10 USC 2866 (a) authorizes and

  12. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  13. Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1

    SciTech Connect (OSTI)

    1992-12-11

    This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

  14. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect (OSTI)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  15. Atmospheric Radiation Measurement Program Science Plan

    SciTech Connect (OSTI)

    Ackerman, T

    2004-10-31

    The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM's Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

  16. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect (OSTI)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  17. Central Characterization Program (CCP) Transuranic Waste Characterization Quality Assurance Project Plan

    Broader source: Energy.gov [DOE]

    Supporting Technical Document for the Radiological Release Accident Investigation Report (Phase II Report)

  18. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  19. Hanford Site waste minimization and pollution prevention awareness program plan

    SciTech Connect (OSTI)

    Place, B.G.

    1998-09-24

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.

  20. Recent program evaluations: Implications for long-run planning

    SciTech Connect (OSTI)

    Baxter, L.W.; Schultz, D.K.

    1994-06-08

    Demand-side management (DSM) remains the centerpiece of California`s energy policy. Over the coming decade, California plans to meet 30 percent of the state`s incremental electricity demand and 50 percent of its peak demand with (DSM) programs. The major investor-owned utilities in California recently completed the first round of program impact studies for energy efficiency programs implemented in 1990 and 1991. The central focus of this paper is to assess the resource planning and policy implications of Pacific Gas and Electric (PG&E) Company`s recent program evaluations. The paper has three goals. First, we identify and discuss major issues that surfaced from our attempt to apply evaluation results to forecasting and planning questions. Second, we review and summarize the evaluation results for PG&E`s primary energy efficiency programs. Third, we change long-run program assumptions, based on our assessment in the second task, and then examine the impacts of these changes on a recent PG&E demand-side management forecast and resource plan.

  1. Central Characterization Program (CCP) Training and Qualification Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Training and Qualification Plan Central Characterization Program (CCP) Training and Qualification Plan This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. Additional documents referenced and listed in the Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014, report in Attachment F.

  2. LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |

    Energy Savers [EERE]

    Department of Energy LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water

  3. LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |

    Office of Environmental Management (EM)

    Department of Energy LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water

  4. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The Order defines roles and responsibilities for providing quality assurance for DOE products and services.Admin Chg 1, dated 5-8-13, supersedes DOE O 414.1D.

  5. Energy Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE International Energy Storage Database Has Logged 420 Energy Storage Projects Worldwide with 123 GW of Installed Capacity Energy, Energy Assurance, Energy Assurance, Energy Storage, Energy Storage Systems, Energy Surety, Grid Integration, Infrastructure Security, News, News & Events, SMART Grid DOE International Energy Storage Database Has Logged 420 Energy Storage Projects Worldwide with 123 GW of Installed Capacity Berkeley, California, USA, (October 21, 2013) - /PRNewswire-USNewswire/

  6. Quality assurance/quality control summary report for Phase 1 of the Clinch River remedial investigation. Environmental Restoration Program

    SciTech Connect (OSTI)

    Holladay, S.K.; Bevelhimer, M.S.; Brandt, C.C.

    1994-07-01

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants released from the US Department of Energy Oak Ridge Reservation and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. Phase 1 of the CRRI was a preliminary study in selected areas of the Clinch River/Watts Bar Reservoir. Fish, sediment, and water samples were collected and analyzed for inorganic, organic, and radiological parameters. Phase 1 was designed to (1) obtain high-quality data to confirm existing historical data for contaminant levels; (2) determine the range of contaminant concentrations present in the river-reservoir system; (3) identify specific contaminants of concern; and (4) establish the reference (background) concentrations for those contaminants. Quality assurance (QA) objectives for Phase I were that (1) scientific data generated would withstand scientific scrutiny; (2) data would be gathered using appropriate procedures for field sampling, chain-of-custody, laboratory analyses, and data reporting; and (3) data would be of known precision and accuracy. These objectives were met through the development and implementation of (1) a QA oversight program of audits and surveillances; (2) standard operating procedures accompanied by a training program; (3) field sampling and analytical laboratory quality control requirements; (4) data and records management systems; and (5) validation of the data by an independent reviewer. Approximately 1700 inorganic samples, 1500 organic samples, and 2200 radiological samples were analyzed and validated. The QA completeness objective for the project was to obtain valid analytical results for at least 95% of the samples collected.

  7. Coal Power Systems strategic multi-year program plans

    SciTech Connect (OSTI)

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  8. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  9. Quality Assurance Specialist

    Broader source: Energy.gov [DOE]

    Alternate Title(s):Quality Control Technician; Quality Assurance Inspector; Quality Assurance Representative

  10. SU-E-T-205: Improving Quality Assurance of HDR Brachytherapy: Verifying Agreement Between Planned and Delivered Dose Distributions Using DICOM RTDose and Advanced Film Dosimetry

    SciTech Connect (OSTI)

    Palmer, A L; Bradley, D A; Nisbet, A

    2014-06-01

    Purpose: HDR brachytherapy is undergoing significant development, and quality assurance (QA) checks must keep pace. Current recommendations do not adequately verify delivered against planned dose distributions: This is particularly relevant for new treatment planning system (TPS) calculation algorithms (non TG-43 based), and an era of significant patient-specific plan optimisation. Full system checks are desirable in modern QA recommendations, complementary to device-centric individual tests. We present a QA system incorporating TPS calculation, dose distribution export, HDR unit performance, and dose distribution measurement. Such an approach, more common in external beam radiotherapy, has not previously been reported in the literature for brachytherapy. Methods: Our QA method was tested at 24 UK brachytherapy centres. As a novel approach, we used the TPS DICOM RTDose file export to compare planned dose distribution with that measured using Gafchromic EBT3 films placed around clinical brachytherapy treatment applicators. Gamma analysis was used to compare the dose distributions. Dose difference and distance to agreement were determined at prescription Point A. Accurate film dosimetry was achieved using a glass compression plate at scanning to ensure physically-flat films, simultaneous scanning of known dose films with measurement films, and triple-channel dosimetric analysis. Results: The mean gamma pass rate of RTDose compared to film-measured dose distributions was 98.1% at 3%(local), 2 mm criteria. The mean dose difference, measured to planned, at Point A was -0.5% for plastic treatment applicators and -2.4% for metal applicators, due to shielding not accounted for in TPS. The mean distance to agreement was 0.6 mm. Conclusion: It is recommended to develop brachytherapy QA to include full-system verification of agreement between planned and delivered dose distributions. This is a novel approach for HDR brachytherapy QA. A methodology using advanced film dosimetry and gamma comparison to DICOM RTDose files has been demonstrated as suitable to fulfil this need.

  11. Quality Assurance Exchange March 2006, Volume 2 Issue 1

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange March 2006, Volume 2 Issue 1 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  12. Quality Assurance Exchange June 2006, Volume 2 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange June 2006, Volume 2 Issue 2 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  13. QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3

    Broader source: Energy.gov [DOE]

    QUALITY ASSURANCE EXCHANGE December 2005 Volume 1 Issue 3 U.S. Department of Energy, Office of Corporate Performance Assessment Office of Quality Assurance Programs (EH-31)

  14. Multi-Year Program Plan 2011-2015

    SciTech Connect (OSTI)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  15. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    SciTech Connect (OSTI)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  16. A Program Plan for Photovoltaic Buildings in Florida

    Broader source: Energy.gov [DOE]

    This document outlines plans developed by the Florida Solar Energy Center (FSEC) to support photovoltaic buildings application in the state through the first decade of the 21st century. The emphasis of this program is on identifying and increasing the value of rooftop systems to targeted end users through the use of application experiments.

  17. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  18. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    SciTech Connect (OSTI)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  19. Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants

    Energy Savers [EERE]

    Revised: October 22, 2010 U.S. Department of Energy American Recovery and Reinvestment Act Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Appendix of Compliance Checklists Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants U.S. Department of Energy Appendix of Compliance Checklists October 22, 2010 Concurrences: LeAnn M. Oliver Program Manager, Weatherization &

  20. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  1. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  2. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Introduction

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Appendices

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

  5. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides acceptable approaches for implementing the Quality Assurance requirements and criteria of DOE O 413.3A related to the development and implementation of a Quality Assurance Program for the project. No cancellations.

  6. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  7. Environmental development plan for transportation programs: FY80 update

    SciTech Connect (OSTI)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  8. Next Generation Nuclear Plant Methods Research and Development Technical Program Plan -- PLN-2498

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2008-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  9. Office of Civilian Radioactive Waste Management-Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements and Description | Department of Energy Management-Quality Assurance Requirements and Description Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description A report detailling the requirements and description of the Quality Assurance program. PDF icon Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description More Documents & Publications Quality Assurance Requirements Civilian Radioactive Waste

  10. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation`s LDR/FFCA compliance

    SciTech Connect (OSTI)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA`s primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans.

  11. Multiyear Program Plan for the High Temperature Materials Laboratory

    SciTech Connect (OSTI)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  12. SSL R&D Multi-Year Program Plan | Department of Energy

    Energy Savers [EERE]

    SSL R&D Multi-Year Program Plan SSL R&D Multi-Year Program Plan The U.S. DOE Solid-State Lighting Research and Development Multi-Year Program Plan. PDF icon ssl_mypp2013_web.pdf More Documents & Publications Solid-State Lighting R&D Plan 2015 Project Portfolio 2016

  13. BETO Releases 2016 Update of Multi-Year Program Plan

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s (DOE’s) Bioenergy Technologies Office (BETO) is pleased to announce the 2016 update of the BETO Multi-Year Program Plan (MYPP). The MYPP serves as an operational guide to help BETO manage and coordinate its activities as well as a vehicle to communicate BETO’s mission, goals, and plans to stakeholders and the public. It details BETO’s research, development, demonstration, market transformation, and crosscutting activities for the coming years and outlines how they are important to meeting the nation’s energy and sustainability challenges.

  14. Self-assessment program implementation plan. Revision A

    SciTech Connect (OSTI)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  15. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  16. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    SciTech Connect (OSTI)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented.

  17. The Department of Energy Hydrogen and Fuel Cells Program Plan | Department

    Energy Savers [EERE]

    of Energy The Department of Energy Hydrogen and Fuel Cells Program Plan The Department of Energy Hydrogen and Fuel Cells Program Plan The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science. PDF icon Department of Energy Hydrogen and Fuel

  18. Quality Assurance Exchange April 2009, Volume 5 Issue 1

    Broader source: Energy.gov [DOE]

    Quality Assurance ExchangeA pril 2009, Volume 5 Issue 1 U.S. Department of Energy Office of Quality Assurance Policy and Assistance IN THE SPOTLIGHT: GEORGE DETSIS, PROGRAM MANAGER Analytical Services Program Office of Corporate Safety Programs

  19. CRAD, NNSA- Quality Assurance (QA)

    Broader source: Energy.gov [DOE]

    CRAD for Quality Assurance (QA). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  20. Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-04-29

    This Order ensures that the quality of DOE/NNSA products and services meets or exceeds the customer's expectations. This Order cancels DOE O 414.1A, Quality Assurance, dated 9-29-99, and Attachment 1, paragraph 8, and Attachment 2, paragraph 22, of DOE O 440.1A, Worker Protection Management for DOE Federal and Contractor Employees, dated 3-27-98. Cancels: DOE O 414.1A and DOE O 440.1A, parts as noted.

  1. Signed Quality Assurance Hub Memo

    Office of Environmental Management (EM)

    :I I! DR. STEVEN L. KRAHN DEPUTY ASSISTANT SEC SAFETY AND SECCTRITY PROGRAM ENVIRONMENTAL MANAGEMENT SUBJECT: Office of Environmental Management Quality Assurance Performance Assessment, Commitment, and Corrective Action Management Program Launch In a memorandum to the FieldlSite Managers dated July 10,2009, it was announced that the Office of Standards and Quality Assurance (EM-23) had deployed a pilot prototype web-based system (Hub) to facilitate providing real-time status of Quality

  2. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  3. Smart Grid R&D Multi-Year Program Plan (2010-2014) - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2011 Update Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2011 Update The Smart Grid Research and...

  4. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    none,

    2009-02-01

    This 2008 Multi-Year Research, Development, and Demonstration Program Plan covers the 2009-2015 period with program activities to 2025.

  5. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 3.0: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 3 - 1 2012 Technical Plan 3.0 Technical Plan This section of the Plan provides a detailed outline of the various activities occurring within the technical sub-programs of the Fuel Cells Technologies Program (FCT Program). The technical sub- programs of the FCT Program are as follows: 3.1 Hydrogen Production 3.2 Hydrogen Delivery 3.3 Hydrogen Storage 3.4 Fuel Cells 3.5 Manufacturing R&D 3.6 Technology Validation 3.7 Hydrogen Safety, Codes and Standards 3.8 Education and Outreach 3.9

  6. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect (OSTI)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  7. Vehicle Technologies Program - Multi-Year Program Plan 2011-2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Program Plan 2011 - 2015 December 2010 Vehicle Technologies Program This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would

  8. WE-F-16A-06: Using 3D Printers to Create Complex Phantoms for Dose Verification, Quality Assurance, and Treatment Planning System Commissioning in Radiotherapy

    SciTech Connect (OSTI)

    Kassaee, A; Ding, X; McDonough, J; Reiche, M; Witztum, A; Teo, B

    2014-06-15

    Purpose: To use 3D printers to design and construct complex geometrical phantoms for commissioning treatment planning systems, dose calculation algorithms, quality assurance (QA), dose delivery, and patient dose verifications. Methods: In radiotherapy, complex geometrical phantoms are often required for dose verification, dose delivery and calculation algorithm validation. Presently, fabrication of customized phantoms is limited due to time, expense and challenges in machining of complex shapes. In this work, we designed and utilized 3D printers to fabricate two phantoms for QA purposes. One phantom includes hills and valleys (HV) for verification of intensity modulated radiotherapy for photons, and protons (IMRT and IMPT). The other phantom includes cylindrical cavities (CC) of various sizes for dose verification of inhomogeneities. We evaluated the HV phantoms for an IMPT beam, and the CC phantom to study various inhomogeneity configurations using photon, electron, and proton beams. Gafcromic films were used to quantify the dose distributions delivered to the phantoms. Results: The HV phantom has dimensions of 12 cm 12 cm and consists of one row and one column of five peaks with heights ranging from 2 to 5 cm. The CC phantom has a size 10 cm 14 cm and includes 6 cylindrical cavities with length of 7.2 cm and diameters ranging from 0.6 to 1.2 cm. The IMPT evaluation using the HV phantom shows good agreement as compared to the dose distribution calculated with treatment planning system. The CC phantom also shows reasonable agreements for using different algorithms for each beam modalities. Conclusion: 3D printers with submillimiter resolutions are capable of printing complex phantoms for dose verification and QA in radiotherapy. As printing costs decrease and the technology becomes widely available, phantom design and construction will be readily available to any clinic for testing geometries that were not previously feasible.

  9. HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

  10. DATA COLLECTION, QUALITY ASSURANCE, AND ANALYSIS PLAN FOR THE 2008/2009 HYDROGEN AND FUEL CELLS KNOWLEDGE AND OPINIONS SURVEYS

    SciTech Connect (OSTI)

    Schmoyer, Richard L; Truett, Lorena Faith; Diegel, Susan W

    2008-09-01

    The 2008/2009 Knowledge and Opinions Survey, conducted for the Department of Energy's Hydrogen Program will measure the levels of awareness and understanding of hydrogen and fuel cell technologies within five target populations: (1) the general public, (2) students, (3) personnel in state and local governments, (4) potential end users of hydrogen fuel and fuel cell technologies in business and industry, and (5) safety and code officials. The ultimate goal of the surveys is a statistically valid, nationally based assessment. Distinct information collections are required for each of the target populations. Each instrument for assessing baseline knowledge is targeted to the corresponding population group. While many questions are identical across all populations, some questions are unique to each respondent group. The biggest data quality limitation of the hydrogen survey data (at least of the general public and student components) will be nonresponse bias. To ensure as high a response rate as possible, various measures will be taken to minimize nonresponse, including automated callbacks, cycling callbacks throughout the weekdays, and availability of Spanish speaking interviewers. Statistical adjustments (i.e., sampling weights) will also be used to account for nonresponse and noncoverage. The primary objective of the data analysis is to estimate the proportions of target population individuals who would respond to the questions in the various possible ways. Data analysis will incorporate necessary adjustments for the sampling design and sampling weights (i.e., probability sampling). Otherwise, however, the analysis will involve standard estimates of proportions of the interviewees responding in various ways to the questions. Sample-weight-adjusted contingency table chi-square tests will also be computed to identify differences between demographic groups The first round of Knowledge and Opinions Surveys was conducted in 2004. Analysis of these surveys produced a baseline assessment of technical knowledge about hydrogen and fuel cells and a statistically valid description of opinions about safety and potential usage in the United States. The current surveys will repeat the process used in 2004. In addition the 2008/2009 survey results will be compared with the 2004 baseline results to assess changes in knowledge levels and opinions. In 2011/2012, the surveys will be repeated, and changes in knowledge and opinions will again be assessed. The information gained from these surveys will be used to enhance and update the DOE Hydrogen Program's education efforts.

  11. Quality Assurance Corporate Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Assurance Corporate Board The Office of Environmental Management (EM) Quality ... Safety and Security Program, who is the Chief Executive Officer and Chair of the Board. ...

  12. Bioenergy Technologies Office Multi-Year Program Plan: March 2016

    Broader source: Energy.gov [DOE]

    This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  13. High-level waste management technology program plan

    SciTech Connect (OSTI)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  14. TRUPACT-II Hydrogen G-Valve Program Test Plan

    SciTech Connect (OSTI)

    Mroz, Eugene J.

    1999-01-01

    This test plan describes the objectives, scope, participants, and components of the Transuranic Package Transporter-II (TRUPACT-II) Hydrogen G-Value Program (GH2P). The GH2P builds on the experience, results, and experimental setup of the TRUPACT-II Matrix Depletion Program (MDP) to establish effective hydrogen G-values (G-values) for additional waste matrices. This plan details the experimental design and test matrices for experiments to measure the G-value for additional waste matrices, including first- and second-stage sludges at the Idaho National Engineering and Environmental Laboratory, and molten salt extraction residues with varying amounts of residual moisture (i.e., unbound water). Data collected from the GH2P will be used to support an application to the US Nuclear Regulatory Commission for G-values and corresponding wattage limits for the TRUPACT-II payloads containing these waste matrices. The testing will also evaluate the ability to determine G-values on a waste stream basis.

  15. Certifications and Assurances for Use with SF-424 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Assurances for Use with SF-424 Certifications and Assurances for Use with SF-424 PDF icon Certifications and Assurances for Use with SF-424 More Documents & Publications Assurances - Non-Construction Programs National Policy Assurances to be Incorporated as Award Terms Microsoft Word - National Policy AssurancesAwardTermsREVJuly2005.doc

  16. SOPP-43, EM-23 Quality Assurance Oversight | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Program Management » Quality Assurance » SOPP-43, EM-23 Quality Assurance Oversight SOPP-43, EM-23 Quality Assurance Oversight Procedure to describe the process that will be utilized by the EM Office of Standards and Quality Assurance to guide its activities related to oversight and audit of the EM Field/site, project, and vendor QA programs. PDF icon SOPP-43, EM-23 Quality Assurance Oversight More Documents & Publications Protocol for EM Review/Field Self-Assessment of

  17. Building America Program Research-to-Market Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Research-to-Market Plan Building America Program Research-to-Market Plan This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America's research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input

  18. EM Quality Assurance Assessment Schedule FY 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Quality Assurance Assessment Schedule FY 2010 EM Quality Assurance Assessment Schedule FY 2010 Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010. PDF icon EM Quality Assurance Assessment Schedule FY 2010 More Documents & Publications Line Management Understanding of QA and Oversight SOPP-43, EM-23 Quality Assurance Oversight QA Corporate Board Meeting - February 2011

  19. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    SciTech Connect (OSTI)

    Ternes, Mark P; Schweitzer, Martin; Tonn, Bruce Edward; Schmoyer, Richard L; Eisenberg, Joel Fred

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  20. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 6.0 Program Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Multi-Year Research, Development and Demonstration Plan Page 6 - 1 6.0 Program Management and Operations The U.S. Department of Energy's (DOE's) Hydrogen and Fuel Cells Program (the Program) is composed of activities within the Offices of Energy Efficiency and Renewable Energy (EERE); Fossil Energy (FE); Nuclear Energy (NE); and Science (SC). EERE's Fuel Cell Technologies Program (FCT Program) represents the major component of this effort. The FCT Program Manager manages the

  1. 2011 Annual Planning Summary for Loan Programs Office (LPO) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Loan Programs Office (LPO) 2011 Annual Planning Summary for Loan Programs Office (LPO) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Loan Programs Office (LPO). PDF icon 2011 Annual Planning Summary for Loan Programs Office (LPO) More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office 2012 Annual

  2. DOE National SCADA Test Bed Program Multi-Year Plan | Department of Energy

    Energy Savers [EERE]

    National SCADA Test Bed Program Multi-Year Plan DOE National SCADA Test Bed Program Multi-Year Plan This document presents the National SCADA Test Bed Program Multi-Year Plan, a coherent strategy for improving the cyber security of control systems in the energy sector. The NSTB Program is conducted within DOE's Office of Electricity Delivery and Energy Reliability (OE), which leads national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure,

  3. Proceedings of the flexible, midsize gas turbine program planning workshop

    SciTech Connect (OSTI)

    1997-03-01

    The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

  4. Local Energy Assurance Planning Selectees

    Office of Environmental Management (EM)

    Selectees

  5. Reinforcing of QA/QC programs in radiotherapy departments in Croatia: Results of treatment planning system verification

    SciTech Connect (OSTI)

    Jurkovi?, Slaven; vabi?, Manda; Dikli?, Ana; Smilovi? Radoj?i?, ?eni; Dundara, Dea; Kasabai?, Mladen; Ivkovi?, Ana; Faj, Dario

    2013-04-01

    Implementation of advanced techniques in clinical practice can greatly improve the outcome of radiation therapy, but it also makes the process much more complex with a lot of room for errors. An important part of the quality assurance program is verification of treatment planning system (TPS). Dosimetric verifications in anthropomorphic phantom were performed in 4 centers where new systems were installed. A total of 14 tests for 2 photon energies and multigrid superposition algorithms were conducted using the CMS XiO TPS. Evaluation criteria as specified in the International Atomic Energy Agency Technical Reports Series (IAEA TRS) 430 were employed. Results of measurements are grouped according to the placement of the measuring point and the beam energy. The majority of differences between calculated and measured doses in the water-equivalent part of the phantom were in tolerance. Significantly more out-of-tolerance values were observed in nonwater-equivalent parts of the phantom, especially for higher-energy photon beams. This survey was done as a part of continuous effort to build up awareness of quality assurance/quality control (QA/QC) importance in the Croatian radiotherapy community. Understanding the limitations of different parts of the various systems used in radiation therapy can systematically improve quality as well.

  6. SSL Pricing and Efficacy Trend Analysis for Utility Program Planning

    SciTech Connect (OSTI)

    Tuenge, Jason R.

    2013-10-01

    An LED lamp or luminaire can generally be found that matches or exceeds the efficacy of benchmark technologies in a given product category, and LED products continue to expand into ever-higher lumen output niches. However, the price premium for LED continues to pose a barrier to adoption in many applications, in spite of expected savings from reduced energy use and maintenance. Other factors—such as dimmability and quality of light—can also present challenges. The appropriate type, timing, and magnitude of energy efficiency activities will vary from organization to organization based on local variables and the method of evaluation. A number of factors merit consideration when prioritizing activities for development. Category-specific projections for pricing and efficacy are provided herein to assist in efficiency program planning efforts.

  7. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

  8. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    P. E. MacDonald

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

  9. Section 3, Bioenergy Technologies Office Multi-Year Program Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... volumes aligned, and achievable path to market penetration defined Marketing plan including fuel testing and approval coordinated with long-term project plans ...

  10. Title 43 CFR 1600-1610 Planning, Programming, Budgeting | Open...

    Open Energy Info (EERE)

    Abstract These regulations outline the process for development, approval, maintenance, amendment and revision of resource management plans, and the use of existing plans...

  11. Section 22: Quality Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Quality Assurance (40 CFR 194.22) Table of Contents 22.0 Quality Assurance (40 CFR ...

  12. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Energy Savers [EERE]

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  13. SOPP-43, EM-23 Quality Assurance Oversight

    Energy Savers [EERE]

    POLICY: The Office of Environmental Management (EM) Quality Assurance program requirements and expectations are documented in the EM Quality Assurance Program (QAP), EM-QA-001, dated October 2008. The QAP is the EM management system to ensure that all EM organizations "do work correctly." The QAP meets the requirements of DOE O 414.1C, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." The QAP demonstrates how QA and the Integrated Safety

  14. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Multi-Year Program Plan: March 2015 Update Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  15. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Quality Assurance Plan Examples Example 64 8.3 QUALITY ASSURANCE This section describes policies and procedures that will be used to meet QA program objectives. This section also develops the strategies PFP will use to ensure the S&M of the PFP inventory, the material stabilization project, the deactivation project, and the dismantlement of the PFP Complex buildings and are completed in a high quality manner. 8.3.1 QA Program The QA program for the PFP Stabilization and Deactivation Project

  16. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    SciTech Connect (OSTI)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energys Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (OHara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities projects for control room modernization.

  17. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-07-01

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  18. Track 9: Quality Assurance

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 9: Quality Assurance

  19. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Technical Plan 4.0 Technical Plan The technical approach addresses the barriers to deployment of Enhanced Geothermal Systems. The technical plan describes two strategic areas of focus which will be implemented concurrently improve geothermal technology and accelerate EGS commercialization: 1. Research and Development; and 2. Enhanced Geothermal Systems Validation. Section 4.0 Table of Contents 4.0 Technical Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  20. Analysis of offsite Emergency Planning Zones for Rocky Flats Plant

    SciTech Connect (OSTI)

    Inger, J.R. ); Brown-Strattan, M.A. . Rocky Flats Plant)

    1991-01-01

    The purpose of this quality assurance program was to ensure the quality and technical adequacy of Phase 2 of the Analysis of Offsite Emergency Planning Zones (EPZ) for the Rocky Flats Plant project. Quality assurance was accomplished by managing and controlling the processes in the development of the product. The quality assurance task team conducted audits, reviews, and surveillances of project and related activities. This process contributed to identifying areas where the quality assurance plan was not fully implemented, areas needing improvement, and/or corrective actions resulting in a improved product. During the reviews and audits, several key areas were identified where quality assurance plan implementation needed to be improved. These areas included maintaining adequate documentation, reviewing technical results, making inputs traceable to technical results, and understanding that all personnel are responsible for quality.

  1. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    SciTech Connect (OSTI)

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

  2. Quality Assurance Exchange September 2005, Volume 1 Issue 2

    Broader source: Energy.gov [DOE]

    Quality Assurance Exchange September 2005, Volume 1 Issue 2 U.S. Department of Energy, Off ice of Corporate Performance Assessment Off ice of Quality Assurance Programs (EH-31)

  3. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect (OSTI)

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  4. EM Quality Assurance Policy, Revision 0 | Department of Energy

    Energy Savers [EERE]

    Policy, Revision 0 EM Quality Assurance Policy, Revision 0 Previous EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 0). This document has been superseded by Revision 1 of the policy, but is still in use at some EM sites. PDF icon EM Quality Assurance Policy, Revision 0 More Documents & Publications Line Management Understanding of QA and Oversight EM Quality Assurance Program (EM-QA-001 Revision 0) QA Corporate Board Meeting - February 2010 (Teleconference)

  5. Office of Standards and Quality Assurance Correspondence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Services » Program Management » Quality Assurance » Office of Standards and Quality Assurance Correspondence Office of Standards and Quality Assurance Correspondence The Safety and Security Program (EM-20) and subsequently the Office of Standards and Quality Assurance (EM-23) place a large emphasis on the fact that the Environmental Management (EM) work of safely cleaning up the environmental legacy of the Cold War is performed in the Field. A primary role of our Headquarters (HQ)

  6. Multiyear Program Plan: Reducing Friction and Wear in Heavy Vehicles

    SciTech Connect (OSTI)

    R.R. Fessler; G.R. Fenske

    1999-12-13

    As described in its multiyear program plan for 1998-2000, the Office of Heavy Vehicle Technologies (OHVT) envisions the development of a fuel-flexible, energy-efficient, near-zero-emissions, heavy-duty U.S. diesel engine technology devolving into all truck classes as a real and viable strategy for reducing energy requirements for commercial transport services and the rapidly growing multipurpose vehicle market (pickups, vans, and sport utility vehicles). Implementation of the OHVT program plan will have significant national benefits in energy savings, cleaner air, more jobs, and increased gross domestic product (GDP). Successful implementation will reduce the petroleum consumption of Class 1-8 trucks by 1.4 million barrels of oil per day by 2020 and over 1.8 million by 2030, amounting to a reduction in highway petroleum consumption of 13.2% and 18.6%, respectively. All types of regulated emissions will be reduced, that is, 20% drop in PM10 emissions (41,000 metric tons per year) by 203 0, 17% reduction in CO2 greenhouse gases (205 million metric tons per year), 7% reduction in NOx, 20% reduction in NMHC, and 30% reduction in CO. An increase of 15,000 jobs by 2020 is expected, as is an increase of $24 billion in GDP. The strategy of OHVT is to focus primarily on the diesel engine since it has numerous advantages. It has the highest efficiency of any engine today, 45% versus 30% for production gasoline engines; and it can be made more efficient at least to 55% and possibly up to 63%. It is the engine of choice for heavy vehicles (trucks), because it offers power, efficiency, durability, and reliability and is used extensively in rail, marine, and off-road applications. Its emission can be ultra-low to near zero, and the production infrastructure is already in place. The primary goals of OHVT are as follows: (1) Develop by 2002 the diesel-engine enabling technologies to support large-scale industry dieselization of light trucks, achieving a 35% fuel efficiency improvement over equivalent gasoline-fueled trucks. (2) Develop by 2004 the enabling technology for a Class 7-8 truck with a fuel efficiency of 10 mpg (at 65 mph) that will meet prevailing emission standards, using either diesel or a liquid alternative fuel. (3) Develop by 2006 diesel engines with fuel flexibility and a thermal efficiency of 55% with liquid alternative fuels, and a thermal efficiency of 55% with dedicated gaseous fuels. (4) Develop a methodology for analyzing and evaluating the operation of a heavy vehicle as an integrated system, considering such factors as engine efficiency; emissions; rolling resistance; aerodynamic drag; friction, wear, and lubrication effects; auxiliary power units; material substitutions for reducing weight; and other sources of parasitic energy losses. Overarching these considerations is the need to preserve system functionality, cost, competitiveness, reliability, durability, and safety.

  7. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  8. DOE Releases Climate Change Technology Program Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan, which details measures to accelerate the development and reduce the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions. ...

  9. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  10. ARM Airborne Carbon Measurements VI (ACME VI) Science Plan (Program...

    Office of Scientific and Technical Information (OSTI)

    Title: ARM Airborne Carbon Measurements VI (ACME VI) Science Plan From October 1 through September 30, 2016, the Atmospheric RadiationMeasurement (ARM) Aerial Facility will deploy ...

  11. Quality Assurance Exchange Winter 2010 Volume 6 Issue 1 | Department of

    Office of Environmental Management (EM)

    Energy Quality Assurance Exchange Winter 2010 Volume 6 Issue 1 Quality Assurance Exchange Winter 2010 Volume 6 Issue 1 Quality Assurance Exchange Winter 2010 Volume 6 Issue 1 U.S. Department of Energy Office of Quality Assurance Policy and Assistance A new decade is upon us and the Office of Quality Assurance Policy and Assistance (HS-23) is looking forward to accomplishing activities planned for FY 2010. For instance, the results of the 2009 Survey of Quality Assurance (QA) Implementation

  12. 2013 Annual Planning Summary for the Loan Program Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Loan Program Office 2013 Annual Planning Summary for the Loan Program Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Loan Program Office. PDF icon LPO_NEPA-APS-2013.pdf More Documents & Publications EIS-0394: Record of Decision 2013 Annual Planning Summary for the Nevada Site Office EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement

  13. Weapons Quality Assurance Qualification Standard

    Broader source: Energy.gov (indexed) [DOE]

    5-2008 September 2008 DOE STANDARD WEAPON QUALITY ASSURANCE QUALIFICATION STANDARD NNSA Weapon Quality Assurance Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1025-2008 This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-STD-1025-2008 iv INTENTIONALLY BLANK DOE-STD-1025-2008 v

  14. Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

    Energy Savers [EERE]

    Protocol for QAP/QIP Review March 2010 1 Table of Content 1.1 Overview ............................................................................................................................................... 2 1.2 Purpose .................................................................................................................................................. 2 1.3 EM-HQ Corporate Review Process

  15. Wind Energy Multiyear Program Plan for 2007-2012

    SciTech Connect (OSTI)

    None, None

    2007-08-01

    The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

  16. Wind Energy Multiyear Program Plan For 20072012

    SciTech Connect (OSTI)

    None

    2007-08-01

    The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

  17. 2012 Annual Planning Summary for Loan Program Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Loan Program Office.

  18. 2014 Annual Planning Summary for the Loan Programs Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Loan Programs Office.

  19. Sandia Energy - Energy Assurance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy, Energy Assurance, Energy Surety, Grid Integration, Infrastructure Security, Microgrid, News, News & Events, Renewable Energy, Systems Analysis, Systems Engineering,...

  20. Fermilab | Directorate | Assurance Council

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assurance Council The purpose of the Assurance Council is to identify and communicate risk and serve as a mechanism to provide reasonable assurance to the laboratory director that sufficient internal control and oversight systems are in place and are operating properly within Fermilab’s CAS management systems. Visit the Assurance Council SharePoint site for more information. Archived meeting minutes Archived documents

  1. CRAD, NNSA- Evaluating Contractor Assurance Systems

    Broader source: Energy.gov [DOE]

    CRAD for Evaluating Contractor Assurance Systems. Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  2. Clean coal technologies: Research, development, and demonstration program plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

  3. IT Capital Planning Corporate Management Improvement Program (CMIP)

    Broader source: Energy.gov [DOE]

    The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

  4. Programs Planning to Do Evaluations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Preliminary Process and Market Evaluation February 13,...

  5. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  6. Emergency planning | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emergency planning Subscribe to RSS - Emergency planning Emergency Planning involves determining, in advance, what will be done in response to specific emergencies including identification and allocation of resources, risk management, mitigation, continuity and recovery. Staff training, using drills, exercises and real events, is an integral part of assuring that the emergency program can be implemented. COLLOQUIUM: Technical Aspects of the Iran Nuclear Agreement After 20 months of negotiation,

  7. Office of Alcohol Fuels Program plan, FY 1981

    SciTech Connect (OSTI)

    1980-10-01

    The goal of the Office of Alcohol Fuels is to promote the production, distribution, and use of alcohol fuels. The program objectives are defined and the strategy for implementation is described. An organizational model of the operation is included. The roles of the 3 program offices and various field offices are described. (DMC)

  8. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  9. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  10. Grid Modernization Multi-Year Program Plan (MYPP) | Department of Energy

    Office of Environmental Management (EM)

    Grid Modernization Multi-Year Program Plan (MYPP) Grid Modernization Multi-Year Program Plan (MYPP) Our extensive, reliable power grid has fueled the nation's growth since the early 1900s. Access to electricity is such a fundamental enabler for the economy that the National Academy of Engineering named "electrification" the greatest engineering achievement of the 20th century. However, the grid we have today does not have the attributes necessary to meet the demands of the 21st century

  11. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    SciTech Connect (OSTI)

    White, D.L.; Mihlmester, P.E.

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  12. Review of the Headquarters Facilities Emergency Response Plans

    Energy Savers [EERE]

    Independent Oversight and Performance Assurance Office of the Secretary of Energy March 2002 Review of the Headquarters Facilities Emergency Response Plans OVERSIGHT Table of Contents 1.0 INTRODUCTION ...................................................................... 1 2.0 OVERVIEW OF RESULTS ........................................................ 3 3.0 DISCUSSION OF RESULTS ...................................................... 5 3.1 Emergency Response Programs, Plans, and Procedures

  13. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Preface and Document Revision History

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preface Multi-Year Research, Development, and Demonstration Plan Page i Preface The Fuel Cell Technologies Program Multi-Year Research, Development, and Demonstration Plan (MYRD&D Plan) describes the goals, objectives, technical targets, tasks, and schedules for all activities within the Fuel Cell Technologies Program (FCT Program), which is part of U.S. Department of Energy's (DOE's) Office of Energy Efficiency and Renewable Energy (EERE). The Fuel Cell Technologies Program (FCT Program) is

  14. planning for emergencies

    National Nuclear Security Administration (NNSA)

    >

  15. Program Administration
  16. Training and Drills
  17. Exercises
  18. Readiness Assurance<...

  19. Health and safety plan for operations performed for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Trippet, W.A. II ); Reneau, M.; Morton, S.L. )

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  20. Assurances - Non-Construction Programs

    Office of Environmental Management (EM)

  21. ASSURANCES - NON-CONSTRUCTION PROGRAMS

    Gasoline and Diesel Fuel Update (EIA)

    and the institutional, managerial and financial capability (including funds sufficient ... Will cause to be performed the required financial and compliance audits in accordance with ...

  22. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  23. Report: EM Quality Assurance

    Office of Environmental Management (EM)

    EM QUALITY ASSURANCE September 25, 2008 Submitted by the EMAB Quality Assurance Subcommittee Background: In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to dialogue with the Office of Quality Assurance (EM-60, QA) as it works to revitalize standards and institutionalize QA into Departmental and EM processes. In addition, EMAB was directed to dialogue with EM-60 on incorporating QA and engineering into the procurement process. Board members reviewed and

  24. SSL Pricing and Efficacy Trend Analysis for Utility Program Planning

    SciTech Connect (OSTI)

    Tuenge, J. R.

    2013-10-01

    Report to help utilities and energy efficiency organizations forecast the order in which important SSL applications will become cost-effective and estimate when each "tipping point" will be reached. Includes performance trend analysis from DOE's LED Lighting Facts® and CALiPER programs plus cost analysis from various sources.

  1. EMF RAPID Program research agenda and communication plan

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The driving force behind the Electric and Magnetic Fields (EMF) Research and Public Information Dissemination (RAPID) Program, established by Section 2118 of the Energy Policy Act of 1992, is the ``sense of the Congress that remedial action taken by the Government on electric and magnetic fields, if and as necessary, should be based on, and consistent with, scientifically valid research...`` Specifically, the legislation requires the development of a comprehensive program to: determine whether or not exposure to electric and magnetic fields produced by the generation, transmission, and use of electric energy affects human health; carry out research, development, and demonstration with respect to technologies to mitigate any adverse human health effects; and provide for the collection, compilation, publication, and dissemination of scientifically valid information to the public on the following subjects: (a) possible human health effects of electric and magnetic fields; (b) the types and extent of human exposure to electric and magnetic fields in various occupational and residential settings; (c) technologies to measure and characterize electric and magnetic fields; and (d) methods to assess and manage exposure to electric and magnetic fields. The Department of Energy (DOE) is responsible for the overall administration of the 5-year, and $65 million EMF RAPID Program. The program will be jointly funded by both Federal non-Federal sources with non-Federal contributions accounting for at least 50% of the total funding.

  2. US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update

    SciTech Connect (OSTI)

    Grant, C W; Lenderman, J S; Gansemer, J D

    2011-02-24

    This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed by Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).

  3. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect (OSTI)

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  4. Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary

    SciTech Connect (OSTI)

    1987-03-01

    This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

  5. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    SciTech Connect (OSTI)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

  6. Planning under uncertainty solving large-scale stochastic linear programs

    SciTech Connect (OSTI)

    Infanger, G. . Dept. of Operations Research Technische Univ., Vienna . Inst. fuer Energiewirtschaft)

    1992-12-01

    For many practical problems, solutions obtained from deterministic models are unsatisfactory because they fail to hedge against certain contingencies that may occur in the future. Stochastic models address this shortcoming, but up to recently seemed to be intractable due to their size. Recent advances both in solution algorithms and in computer technology now allow us to solve important and general classes of practical stochastic problems. We show how large-scale stochastic linear programs can be efficiently solved by combining classical decomposition and Monte Carlo (importance) sampling techniques. We discuss the methodology for solving two-stage stochastic linear programs with recourse, present numerical results of large problems with numerous stochastic parameters, show how to efficiently implement the methodology on a parallel multi-computer and derive the theory for solving a general class of multi-stage problems with dependency of the stochastic parameters within a stage and between different stages.

  7. Assuring quality in high-consequence engineering

    SciTech Connect (OSTI)

    Hoover, Marcey L.; Kolb, Rachel R.

    2014-03-01

    In high-consequence engineering organizations, such as Sandia, quality assurance may be heavily dependent on staff competency. Competency-dependent quality assurance models are at risk when the environment changes, as it has with increasing attrition rates, budget and schedule cuts, and competing program priorities. Risks in Sandia's competency-dependent culture can be mitigated through changes to hiring, training, and customer engagement approaches to manage people, partners, and products. Sandia's technical quality engineering organization has been able to mitigate corporate-level risks by driving changes that benefit all departments, and in doing so has assured Sandia's commitment to excellence in high-consequence engineering and national service.

  8. Page 6, The Thrift Savings Plan (TSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan (TSP) The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees. The best way to assure that your retirement income meets...

  9. Secretary Chu Announces Over $8 Million to Support Local Energy Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Initiatives | Department of Energy 8 Million to Support Local Energy Assurance Planning Initiatives Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives February 19, 2010 - 12:00am Addthis WASHINGTON - Energy Secretary Steven Chu announced today that the Department of Energy is making selection of awards for more than $8 million to 43 cities and towns across the country to develop or expand local energy assurance plans that will improve

  10. Secretary Chu Announces Over $8 Million to Support Local Energy Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Initiatives | Department of Energy Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives Secretary Chu Announces Over $8 Million to Support Local Energy Assurance Planning Initiatives, Recovery Act Funding to Help Communities Prepare for Energy Emergencies and Disruptions PDF icon Secretary Chu Announces Over $8 Million to Support Local Energy

  11. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  12. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  13. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect (OSTI)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  14. Vehicle Technologies Office: Multi-Year Program Plan 2011-2015 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Office: Multi-Year Program Plan 2011-2015 Vehicle Technologies Office: Multi-Year Program Plan 2011-2015 The VT MYPP, FY 2011 … 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administrations goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy. PDF icon vt_mypp_2011-2015.pdf More Documents

  15. Program Planning & Management Forms (5000-5999) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning & Management Forms (5000-5999) Program Planning & Management Forms (5000-5999) DOE F 5160.1 (pdf) Reprogramming, Restructuring, and Appropriation Transfer Summary DOE F 5480.4 (pdf) Contractor Employee Occupational Safety or Health Complaint DOE F 5484.3 (pdf) Individual Accident/Incident Report DOE F 5484.4 (pdf) Tabulation of Work-Hours and Vehicle Usage, and Property Valuation DOE F 5500.2 (pdf) Operational Incident Report DOE F 5631.18 (pdf) Security Acknowledgement

  16. ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program

    SciTech Connect (OSTI)

    Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

    1995-09-27

    Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative transfer calculations, will be acquired using the aircraft and surface facilities available to ARESE. This document outlines the scientific approach and measurement requirements of the project.

  17. Power Assure | Open Energy Information

    Open Energy Info (EERE)

    Assure Jump to: navigation, search Name: Power Assure Place: Santa Clara, California Zip: 95051 Sector: Efficiency Product: California-based, service start-up focused on energy...

  18. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  19. Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations Call Slides and Discussion Summary, August 2, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    , 2012 Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations Call Slides and Discussion Summary Agenda * Call Logistics and Attendance  Has you program conducted, or is it in the process of conducting or planning an evaluation? * Program Experience and Lessons:  Jane Peters , Research Into Action * Discussion:  Do you have clarifying questions or concerns about what was presented?  Are there parts of the coordination process

  20. DOE-NE Light Water Reactor Sustainability Program and EPRI Long Term Operation Program … Joint Research & Development Plan

    Office of Environmental Management (EM)

    2-24562 Revision 4 DOE-NE Light Water Reactor Sustainability Program and EPRI Long Term Operations Program - Joint Research and Development Plan April 2015 U.S. Department of Energy Office of Nuclear Energy DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the

  1. TASK TECHNICAL AND QUALITY ASSURANCE PLAN FOR THE CHARACTERIZATION AND LEACHING OF A THERMOWELL AND CONDUCTIVITY PROBE PIPE SAMPLE FROM TANK 48H

    SciTech Connect (OSTI)

    Fondeur, F

    2005-11-02

    A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. The material on the Tank 48H internal tank surfaces is estimated to have a total volume of approximately 115 gallons consisting of mostly water soluble solids with approximately 20 wt% insoluble solids (33 Kg TPB). This film is assumed to be readily removable. The material on the internal equipment/surfaces of Tank 48H is presumed to be easily removed by slurry pump operation. For Tank 49H, the slurry pumps were operated almost continuously for approximately 6 months after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids--Na{sub 3}H(CO){sub 2}, Al(OH){sub 3}, NaTPB, NaNO{sub 3} and NaNO{sub 2}. Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. Depending on when the Recycle material or inhibited water can be added to Tank 48H, the tank may not be allowed to agitate for this same amount of time. The tank will be filled above 150 inches and agitated at least once during the Aggregation process. If the material cannot be removed after completion of these batches, the material may be removed with additional fill and agitation operations. There is a risk that this will not remove the material from the internal surfaces. As a risk mitigation activity, properties of the film and the ease of removing the film from the tank will be evaluated prior to initiating Aggregation. This task will investigate the dissolution of Tank 48H solid deposits in inhibited water and DWPF recycle. To this end, tank personnel plan to cut and remove a thermowell pipe from Tank 48H and submit the cut pieces to SRNL for both characterization and leaching behavior. A plan for the removal, packaging and transport of the thermowell pipe has been issued. This task plan outlines the proposed method of analysis and testing to estimate (1) the thickness of the solid deposit, (2) chemical composition of the deposits and (3) the leaching behavior of the solid deposits in inhibited water (IW) and in Tank 48H aggregate solution.

  2. Quality Assurance Specialist

    Broader source: Energy.gov [DOE]

    This position is located in the Office of the Assistant Secretary for Environmental Management (EM), Office of Standards and Quality Assurance. The EM mission is to achieve safe and compliant...

  3. IT Quality Assurance

    Broader source: Energy.gov [DOE]

    Quality, error-free work holds down costs. Avoiding mistakes and rework saves valuable time, effort, and materials. Quality assurance provides the mechanisms for paying close attention to details...

  4. Software Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-02

    DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01. To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). Does not cancel other directives.

  5. Software Quality Assurance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-02

    To define requirements and responsibilities for software quality assurance (SQA) within the Department of Energy (DOE). DOE N 251.40, dated 5/3/01, extends this directive until 12/31/01.

  6. Quality Assurance Corporate Board

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management (EM) Quality Assurance Corporate Board is an executive board that includes both senior U.S. Department of Energy (DOE) and contractor representatives who are...

  7. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  8. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    SciTech Connect (OSTI)

    Chapas, Richard B.; Colwell, Jeffery A.

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  9. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    SciTech Connect (OSTI)

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  10. Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update

    Broader source: Energy.gov [DOE]

    This is the May 2013 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  11. Update Released to BETOs Multi-Year Program Plan

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office is pleased to announce the release of its newly updated Multi-Year Program Plan (MYPP). The MYPP sets forth the goals and structure of the Office. This latest version presents a merged conversion research and development (R&D) section, the renaming of the demonstration and market transformation area, and emerging work in wet waste-to-energy feedstocks.

  12. Headquarters Facilities Master Security Plan- Chapter 17, Headquarters Security Officer Program

    Broader source: Energy.gov [DOE]

    2016 Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program Describes the requirement for all HQ elements to appoint a Headquarters Security Officer (HSO) and Alternate HSO to perform certain security functions in behalf of the element’s employees and contractors. This chapter also describes HSO duties, training requirements, and resources.

  13. Characterization program management plan for Hanford K basin spent nuclear fuel

    SciTech Connect (OSTI)

    TRIMBLE, D.J.

    1999-07-19

    The program management plan for characterization of the K Basin spent nuclear fuel was revised to incorporate corrective actions in response to SNF Project QA surveillance 1K-FY-99-060. This revision of the SNF Characterization PMP replaces Duke Eng.

  14. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    SciTech Connect (OSTI)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  15. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3 The American Recovery and...

  16. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9, 2012, Volume 3 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 9, 2012, Volume 3 No. 3 The American Recovery and...

  17. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 3 2011, Volume 2 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4 The American Recovery and...

  18. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery...

  19. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and...

  20. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1 2011, Volume 2 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2 The American Recovery and...

  1. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 3 2011, Volume 2 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1 The American Recovery and...

  2. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, 2010, Volume 1 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 4, 2010, Volume 1 No. 1 The American Recovery and...

  3. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and...

  4. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2, 2012, Volume 3 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 2, 2012, Volume 3 No. 2 The American Recovery and...

  5. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and...

  6. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4 The American Recovery...

  7. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  8. Health, Safety, & Quality Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Health, Safety, & Quality Assurance Health, Safety, & Quality Assurance Nuclear Safety and Worker Safety and Health training Nuclear Safety and Worker Safety and Health training PPPO's Safety and Health, Nuclear Safety, and Quality Assurance programs collectively ensure protection of public and worker health and safety and the environment. This is accomplished by empowering and holding accountable managers, employees and contractors to prioritize health, safety and environmental

  9. Quality Assurance Baseline Assessment Report to Los Alamos National Laboratory Analytical Chemistry Operations

    SciTech Connect (OSTI)

    Jordan, R. A.

    1998-09-01

    This report summarizes observations that were made during a Quality Assurance (QA) Baseline Assessment of the Nuclear Materials Technology Analytical Chemistry Group (NMT-1). The Quality and Planning personnel, for NMT-1, are spending a significant amount of time transitioning out of their roles of environmental oversight into production oversight. A team from the Idaho National Engineering and Environmental Laboratory Defense Program Environmental Surety Program performed an assessment of the current status of the QA Program. Several Los Alamos National Laboratory Analytical Chemistry procedures were reviewed, as well as Transuranic Waste Characterization Program (TWCP) QA documents. Checklists were developed and the assessment was performed according to an Implementation Work Plan, INEEL/EXT-98-00740.

  10. Quality Assurance for Critical Decision Reviews RM

    Office of Environmental Management (EM)

    Quality Assurance for Critical Decision Reviews Module March 2010 CD-0 O 0 OFFICE OF Q C CD-1 F ENVIRO Standard R Quality A Rev Critical Decis CD-2 M ONMENTAL Review Plan Assuranc view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) e (QA) e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the

  11. Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program

    SciTech Connect (OSTI)

    TP Ackerman; AD Del Genio; RG Ellingson; RA Ferrare; SA Klein; GM McFarquhar; PJ Lamb; CN Long; J Verlinde

    2004-10-30

    The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARMs Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

  12. Hanford site transuranic waste sampling plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    1999-05-13

    This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed.

  13. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-11-30

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  14. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-05-15

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  15. A technology transfer plan for the US Department of Energy's Electric Energy Systems Program

    SciTech Connect (OSTI)

    Harrer, B.J.; Hurwitch, J.W.; Davis, L.J.

    1986-11-01

    The major objective of this study was to develop a technology transfer plan that would be both practical and effective in promoting the transfer of the products of DOE/EES research to appropriate target audiences. The study drew upon several major components of the marketing process in developing this plan: definition/charcterization of the products being produced by the DOE/EES program, identification/characterization of possible users of the products being produced by the program, and documentation/analysis of the methods currently being used to promote the adoption of DOE/EES products. Fields covered include HVDC, new materials, superconductors, electric field effects, EMP impacts, battery storage/load leveling, automation/processing concepts, normal/emergency operating concepts, Hawaii deep water cable, and failure mechanisms.

  16. Fire protection program fiscal year 1997 site support program plan - Hanford fire department

    SciTech Connect (OSTI)

    Good, D.E., Westinghouse Hanford

    1996-07-01

    The mission of the Hanford Fires Department (HFD) is to support the safe and timely cleanup of the Hanford Site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. this includes response to surrounding fire department districts under mutual aids agreements and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site. the fire department also provides site fire marshal overview authority, fire system testing, and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention and education.

  17. Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2012 Update

    Energy Savers [EERE]

    Electricity Delivery & Energy Reliability Smart Grid Research & Development Multi-Year Program Plan (MYPP) 2010-2014 September 2012 Update Smart Grid R&D: 2010-2014 MYPP - Update September 2012 ii Acknowledgment This Multi-Year Program Plan (MYPP) for the Smart Grid Research & Development Program within the U.S. Department of Energy (DOE), Office of Electricity Delivery & Energy Reliability, is the second annual update of the 2010 edition that was produced with significant

  18. Celebrating Science: Jefferson Lab Plans Evening Programs on Oct. 7 and 9

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as Part of Virginia Science Festival Week | Jefferson Lab Celebrating Science: Jefferson Lab Plans Evening Programs on Oct. 7 and Oct. 9 as Part of Virginia Science Festival Week NEWPORT NEWS, VA - In conjunction with the inaugural Virginia Science Festival being held across the Commonwealth Oct. 4-11, 2014, Jefferson Lab will hold two events. Learn About the Building Blocks of Matter on Oct. 7 Jefferson Lab Staff Scientist Douglas Higinbotham will present "Studying the Building Blocks

  19. Better Buildings Peer Exchange Call, Who's Evaluating What? - Planned Program Evaluations, November 17, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Peer Exchange Call Who's Evaluating What? - Planned Program Evaluations November 17 th , 2011 General Notes The Department of Energy (DOE) began the call with a review of the agenda and introductions of call participants (noted on the last page). Featured Speakers:  Dale Hoffmeyer, DOE  Shannon Khal, WI Energy Conservation Corps (WECC)  Alex Castelazo, ASU Global Institute of Sustainability Participants are conducting or are interested in the following evaluation

  20. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect (OSTI)

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.