National Library of Energy BETA

Sample records for asset revitalization initiative

  1. Asset Revitalization Initiative ARI

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Revitalization Initiative ( ARI ) Mission * Community * Reuse ARI is a DOE-wide effort to advance the beneficial reuse of the agency's unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources, and highly skilled workforce. ARI promotes an efficient business environment to encourage collaboration between public and private resources. ARI integrates DOE missions with community interests. ARI is... Our Vision By 2020: Operations

  2. Asset Revitalization Initiative Update by Cynthia Anderson and David Geiser

    Office of Environmental Management (EM)

    Asset Revitalization Initiative Briefing www.doe.gov Asset Revitalization Initiative 1 Sustainability Efficiency Community The Asset Revitalization Initiative Briefing October 2011 LEARN FROM AND TAKE CREDIT FOR PAST ASSET REVITALIZATION EFFORTS * We supported the cleanup and closure of ~ 90 sites that had a role in winning the Cold War; most of those sites are in beneficial reuse. * Since 2005, we have sold > 475,000 ft 2 of real property, both The U.S. Department of Energy (DOE) has a long

  3. Asset Revitalization Initiative Task Force Issues Its Second Report

    Broader source: Energy.gov [DOE]

    The Asset Revitalization Initiative (ARI) Task Force is pleased to announce the release of its second report providing information to the public on historic actions to reuse U.S. Department of...

  4. Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-11

    The Guide is intended to assist sites in sustainable planning, management, and reuse of assets that allows effective mission execution, optimizes federal and public resources, and supports local and national goals for economic growth and diversification in support of DOE O 430.1B.

  5. U.S. Department of Energy Launches New Website for Asset Revitalization Initiative (ARI)

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Today, the U.S.Department of Energy (DOE) launched a website for the Asset Revitalization Initiative (ARI), a DOE-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources and a highly skilled workforce.

  6. DRAFT - DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide is intended to assist sites in sustainable planning, management, and reuse of assets that allows effective mission execution, optimizes federal and public resources, and supports local and national goals for economic growth and diversification in support of DOE O 430.1B.

  7. ARI Asset Revitalization Initiative

    Energy Savers [EERE]

    ... (E2 Wire: The Hill's Energy & Environ ment Blog) - Senate Energy and ... Small modular nuclear reactors, like the one illustrated above by the firm Babcock and Wilcox, ...

  8. Asset Revitalization Guide for Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-16

    Pursuant to the objectives of the Order, the “Asset Revitalization (AR) Guide for Asset Management and Reuse” (AR Guide) was developed to assist DOE and NNSA sites and program offices offer unneeded assets with remaining capacity to the public or other government agencies. DOE continually refines strategies and tools, enabling it to share unique assets, including land, facilities, infrastructure, equipment, and technologies with the public. Real property planning, acquisition, sustainment, and disposal decisions are balanced to accomplish DOE’s mission; reduce risks to workers, the public, and the environment; and minimize lifecycle costs. Does not cancel/supersede other directives.

  9. Notice of Intent to Develop DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    U.S. Department of Energy (DOE) Order 430.1B, Real Property Asset Management, calls for the agency to "establish a corporate, holistic, and performance-based approach to real property life-cycle asset management." It discusses requirements to properly plan, acquire, maintain, recapitalize, and dispose of assets, while recognizing the importance of stakeholder involvement, privatization, cultural and natural preservation, and local economic development.

  10. Notice of Intent to Develop DOE G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-02-19

    U.S. Department of Energy (DOE) Order 430.1B, Real Property Asset Management, calls for the agency to "establish a corporate, holistic, and performance-based approach to real property life-cycle asset management." It discusses requirements to properly plan, acquire, maintain, recapitalize, and dispose of assets, while recognizing the importance of stakeholder involvement, privatization, cultural and natural preservation, and local economic development.

  11. Department of Energy Establishes Asset Revitalization Task Force

    Broader source: Energy.gov [DOE]

    Washington, D.C. – Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion.

  12. NEW - DOE G 430.1-8, Asset Revitalization Guide for Asset Management and Reuse

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Pursuant to the objectives of the Order, the Asset Revitalization (AR) Guide for Asset Management and Reuse (AR Guide) was developed to assist DOE and NNSA sites and program offices offer unneeded assets with remaining capacity to the public or other government agencies. DOE continually refines strategies and tools, enabling it to share unique assets, including land, facilities, infrastructure, equipment, and technologies with the public. Real property planning, acquisition, sustainment, and disposal decisions are balanced to accomplish DOEs mission; reduce risks to workers, the public, and the environment; and minimize lifecycle costs.

  13. Asset Revitalization Initiative | Department of Energy

    Office of Environmental Management (EM)

    Contact Us For general inquiries, please email arinews@hq.doe.gov. Tania Smith ARI Task Force Co-Leader Tania.smith@em.doe.gov 202-586-5008 David Geiser Director, Office of Legacy ...

  14. Asset Revitalization Initiative Update by Cynthia Anderson and...

    Office of Environmental Management (EM)

    sites already support the missions of multiple federal agencies and the private sector. ... in a seamless manner. * Public-private partnerships thrive, and commercial ...

  15. Asset Management Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Asset-Management-Strategies Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

  16. Commercial Building Asset Rating Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Rating Program Commercial Building Asset Rating Program Slides from a Commercial Building Initiative webinar outlining the Commercial Building Asset Rating Program on August 23, 2011. asset_rating.pdf (138.31 KB) More Documents & Publications Commercial Building Energy Asset Rating Workshop Commercial Building Energy Asset Score: 2013 Pilot Overview Commercial Building Energy Asset Rating

  17. Meeting Agenda for October 20, 2011

    Office of Environmental Management (EM)

    Disposal Operations 1:45 pm - 2:15 pm Asset Revitalization Initiative Update, Cynthia Anderson, Lead, Asset Revitalization Initiative; David Geiser, Director of Legacy Management...

  18. Department of Energy Establishes Asset Revitalization Task Force

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corporate Overview - 2012 Department of Energy Corporate Overview - 2012 This book provides an overview of the Department of Energy (DOE). The opening sections describe the mission areas, organizational structure and upcoming critical issues of the Department, followed by brief descriptions of DOE's goals and programs. Later sections provide overviews of the Department's budget, staffing, contract management, project management, Congressional jurisdiction, Government Accountability Office (GAO)

  19. Department of Energy Announces Next Steps for Asset Revitalization...

    Office of Environmental Management (EM)

    ... Nuclear Security and NNSA Administrator, presents EM's Candice Trummell with the NNSA Gold Medal earlier this month. National Nuclear Security Administration Commends Three EM ...

  20. Department of Energy Establishes Asset Revitalization Task Force...

    Office of Environmental Management (EM)

    nonprofits, tribal governments, the private sector and other stakeholders to identify ... nonprofits, tribal governments, the private sector and other stakeholders to leverage ...

  1. Asset Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assets in transmission, federal hydro, facilities, information technology (IT), fish and wildlife, energy efficiency, and other capital program areas. This policy is...

  2. Small Business Liability Relief and Brownfields Revitalization...

    Open Energy Info (EERE)

    Business Liability Relief and Brownfields Revitalization Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Small Business...

  3. Wind energy: a revitalized pursuit (Technical Report) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Wind energy: a revitalized pursuit Citation Details In-Document Search Title: Wind energy: a revitalized pursuit Authors: Blackwell, B.F. ; Feltz, L.V. ...

  4. Wind energy: a revitalized pursuit (Technical Report) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Wind energy: a revitalized pursuit Citation Details In-Document Search Title: Wind energy: a revitalized pursuit You are accessing a document from the Department of Energy's ...

  5. Revitalizing American Competitiveness in Solar Technologies | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy This PowerPoint slide deck was originally presented at the 2012 SunShot Grand Challenge Summit and Technology Forum. It provides an overview of the SunShot program, including goals, management structure, funding and various solar energy initiatives, including GEARED, SUNPATH II and the creation of a new solar energy ecosystem. sssummit2012_plenary_ramesh.pdf (1.8 MB) More Documents & Publications Revitalizing American Competitiveness in Solar Technologies SunShot SEAB Presentation

  6. Asset Revitalization Guide for Asset Management and Reuse (For Informational Purposes Only)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-29

    This draft has been scheduled for final review before the Directives Review Board on 6-18-15. All major comments and concerns should be provided to your DRB representative, following your organization process. If you do not know who your representative is, please see the list of DRB members at https://www.directives.doe.gov/beta/references/directives-review-board. If your office is represented by Ingrid Kolb, Director, Office of Management, please submit your major concerns and comments to the DRB Liaison, Camille Beben (Camille.Beben@hq.doe.gov; 202-586-1014). All major comments and concerns should be submitted by COB 6-17-15.

  7. 2014 SunShot Initiative Technology to Market Subprogram Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is an overview of the SunShot Initiative's technology to market research portfolio. ... SunShot Initiative 2014 Portfolio Overview Revitalizing American Competitiveness in Solar ...

  8. Download the SunShot Initiative 2014 Portfolio | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications 2014 SunShot Initiative Portfolio Book: Tackling Challenges in Solar Energy 2014 SunShot Initiative Portfolio Book: Photovoltaics Revitalizing ...

  9. Revitalizing Innovation in Michigan for Clean Energy Manufacturing |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Revitalizing Innovation in Michigan for Clean Energy Manufacturing Revitalizing Innovation in Michigan for Clean Energy Manufacturing April 25, 2011 - 4:33pm Addthis Senator Debbie Stabenow at the Revitalizing Innovation in Michigan for Clean Energy Manufacturing Workshop Senator Debbie Stabenow at the Revitalizing Innovation in Michigan for Clean Energy Manufacturing Workshop Kerry Duggan Kerry Duggan What does this mean for me? Michigan has expanded its manufacturing

  10. Asset Management Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency and Fish and Wildlife asset categories. The CAB, in consultation with affected business units and the Asset Management Executive Sponsors, determines whether and how...

  11. SunShot: Revitalizing American Competitiveness in Solar Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revitalizing American Competitiveness in Solar Technologies So what is the SunShot Initiative? 2 SunShot Initiative SunShot Initiative 5 - 6¢/kwh without subsidy A 75% cost reduction by the end of the decade Price 3 Pathway to SunShot - CSP 9¢ 2¢ 4¢ 2¢ 3¢ 1¢ 5¢ 1¢ 7¢ 2¢ 2¢ 4¢ 21¢ / kWh 6¢ / kWh ¢ 5¢ 10¢ 15¢ 20¢ 25¢ Thermal Storage Receiver/Heat Transfer Power Plant Solar Field System Price 2010 Solar Field Power Plant Receiver/ Heat Transfer Thermal Storage SunShot Target

  12. Asset Carbon | Open Energy Information

    Open Energy Info (EERE)

    Carbon Jump to: navigation, search Name: Asset Carbon Place: United Kingdom Product: UK-based startup looking to invest in CDMJI projects. References: Asset Carbon1 This article...

  13. Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Watchdog | Department of Energy RFI: Revitalization of DOE's Role as a Regulatory Watchdog Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments highlighting four issues: CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf (283.1 KB) More Documents & Publications DOE Review of Regulations - Center for Regulatory Effectiveness Comments DOE Ex

  14. Queen City Forging Company Revitalized by Lab Partnership | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Queen City Forging Company Revitalized by Lab Partnership Queen City Forging Company Revitalized by Lab Partnership Addthis Description This video tells how Oak Ridge National Laboratory, with support from the Office of Energy Efficiency and Renewable Energy (EERE), teamed up with Queen City Forging, the U.S. Forging Industry, and Infrared Heating Technologies to develop a rapid-infrared heating furnace to produce aluminum turbochargers. Text Version (CG: Rob Mayer - Queen City

  15. Sandia National Laboratories Test Capabilities Revitalization Phase 2

    National Nuclear Security Administration (NNSA)

    Project Completed On Time, Under Budget | National Nuclear Security Administration | (NNSA) Sandia National Laboratories Test Capabilities Revitalization Phase 2 Project Completed On Time, Under Budget March 24, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Test Capabilities Revitalization Phase 2 (TCR 2) project was recently completed on schedule and $4 million under the original budget. Completion of the project, located at Sandia National Laboratories in

  16. Batteries May Fade, But Research Can Revitalize | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Batteries May Fade, But Research Can Revitalize Batteries May Fade, But Research Can Revitalize November 9, 2012 - 4:04pm Addthis The Transmission Electron Microscope (TEM) at the William R. Wiley Environmental Molecular Sciences Laboratory at the Pacific Northwest National Laboratory is used to image metals, ceramics, minerals, nanostructured materials, and biological-related materials and tissues at atomic-bond-length resolution. | Photo of Pacific Northwest National Laboratory The

  17. Energy efficiency in military housing: Monitoring to support revitalization guidebook

    SciTech Connect (OSTI)

    Levins, W.P.; Ternes, M.P.

    1994-11-01

    Oak Ridge National Laboratory is working with the US Army, the US Air Force, and the US Department of Energy to develop a guidebook to be used by architectural and engineering firms in the design phases of military family housing revitalization projects. The purpose of the guidebook is to ensure that energy efficiency is properly addressed in revitalization projects. Monitoring space-heating and cooling energy used in houses both before and after they are revitalized is necessary in order to assess the amount of energy saved by the revitalization process. Three different methods of conducting monitoring experiments are discussed, as well as the methods of data analysis to be used. Houses will be monitored individually using standard gas and electric meters to obtain heating and cooling data for the houses. The authors recommend conducting monitoring programs at Altus Air Force Base, Oklahoma, and Fort Monmouth, New Jersey, because of their project schedules and potential for savings. They do not recommend doing any monitoring at Malmstrom Air Force Base, Montana, because of the relatively small savings that they expect revitalization to accomplish there. They do not recommend seeking out alternative sites for monitoring because of the time required to become familiar with the installation and also because revitalization schedules at alternative sites may be no better than those at the sites they inspected.

  18. Building Energy Asset Score

    Broader source: Energy.gov [DOE]

    Lead Performer: Pacific Northwest National Laboratory (PNNL) – Richland, WAProject Term: Ongoing ProgramFunding Type: Direct Lab FundingProgram Webpage: Commercial Building Energy Asset Score Homepage

  19. Life Cycle Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-26

    The order addresses stewardship of physical assets as valuable national resources in a cost-effective manner to meet the DOE mission using industry standards, a graded approach, and performance objective.

  20. Initial

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Initial operation of the first amplifier stage resulted in self-lasing due to an optical cavity between the polarizing beam-splitter cube and the 0 reflecting mirror a setup ...

  1. Real Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-09-24

    The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out our stewardship responsibilities, and will ensure that our facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Chg 1, dated 2-8-08. Chg 2, dated 4-25-11

  2. Real Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-09-24

    The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out our stewardship responsibilities, and will ensure that our facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Cancels: DOE O 430.1A. Chg 1, dated 2-8-08. Chg 2, dated 4-25-11

  3. Real Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-19

    The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Supersedes DOE O 430.1B Chg 2.

  4. Securing energy assets and infrastructure 2007

    SciTech Connect (OSTI)

    2006-06-15

    This report describes in detail the energy industry's challenges and solutions for protecting critical assets including oil and gas infrastructure, transmission grids, power plants, storage, pipelines, and all aspects of strategic industry assets. It includes a special section on cyber-terrorism and protecting control systems. Contents: Section I - Introduction; U.S Energy Trends; Vulnerabilities; Protection Measures. Section II - Sector-wise Vulnerabilities Assessments and Security Measures: Coal, Oil and Petroleum, Natural Gas, Electric Power, Cybersecurity and Control Systems, Key Recommendations; Section III - Critical Infrastructure Protection Efforts: Government Initiatives, Agencies, and Checklists.

  5. Asset Score Overviews | Department of Energy

    Energy Savers [EERE]

    Energy Asset Score for Energy Services Companies, Engineers and Green Building Consultants Building Energy Asset Score for Real Estate Managers Building Energy Asset Score for ...

  6. Substation asset management study

    SciTech Connect (OSTI)

    Conroy, M.W.; Conidi, J.

    1996-03-01

    This paper will present an overview of our recent findings in the area of substation asset management and will describe how several utilities, in response to the issues listed above, are re-examining their present maintenance practices in search of more cost-effective programs.

  7. Distributed charging of electrical assets

    DOE Patents [OSTI]

    Ghosh, Soumyadip; Phan, Dung; Sharma, Mayank; Wu, Chai Wah; Xiong, Jinjun

    2016-02-16

    The present disclosure relates generally to the field of distributed charging of electrical assets. In various examples, distributed charging of electrical assets may be implemented in the form of systems, methods and/or algorithms.

  8. Exclusive Demo: Asset Score Preview

    Broader source: Energy.gov [DOE]

    The Department of Energy's (DOE) Building Technologies Office invites you to join us for a presentation on Asset Score Preview, a new, simplified version of DOE's Building Energy Asset Scoring tool...

  9. EM Capital Asset Project List

    Broader source: Energy.gov [DOE]

    Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

  10. Revitalizing American Competitiveness in Solar Technologies

    Broader source: Energy.gov [DOE]

    These slides correspond to a presentation given by Oak Ridge National Laboratory Deputy Director for Science and Technology and former SunShot Initiative Director, Dr. Ramamoorthy Ramesh at the...

  11. Revitalizing Y-12's Infrastructure: Building 9995 | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Revitalizing Y-12's Infrastructure: Building 9995 Friday, May 6, 2016 - 11:15am Y-12 National Security Complex in Oak Ridge, TN. Y-12's Analytical Chemistry Operations provides comprehensive analytical services in support of the site's core missions, environmental compliance and overall worker health and safety. ACO scientists, for example, analyze impurity levels to ensure the materials destined for nuclear weapons or naval reactor fuel are of suitably high

  12. EnergyPlus Logo Debuts on Revit Toolbar | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Logo Debuts on Revit Toolbar EnergyPlus Logo Debuts on Revit Toolbar December 7, 2015 - 9:30am Addthis With Insight 360, Revit and FormIt 360 Pro users can use EnergyPlus to calculate building heating and cooling loads and map the results onto the model for easy identification of high load zones and spaces. Image credit: Autodesk. With Insight 360, Revit and FormIt 360 Pro users can use EnergyPlus to calculate building heating and cooling loads and map the results onto the model for easy

  13. Departmental Radiological Emergency Response Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-06-27

    The order establishes requirements and responsibilities for the DOE/NNSA national radiological emergency response assets and capabilities and Nuclear Emergency Support Team assets. Supersedes DOE O 5530.1A, DOE O 5530.2, DOE O 5530.3, DOE O 5530.4, and DOE O 5530.5.

  14. 2014 State of Western's Assets

    SciTech Connect (OSTI)

    2014-01-01

    In this report we document the State of Western’s Assets in terms of physical equipment, financial resources, strategic direction, and human capital, both at the organizational and regional levels. We identify the condition of our assets today and share what work we will be doing in these areas in the coming years.

  15. Commercial Building Energy Asset Scoring Tool

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Asset Scoring Tool will guide your data collection, store your building information, and generate Asset Scores and system evaluations for your building envelope and building systems. The Asset...

  16. Career Map: Asset Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Career Map: Asset Manager Career Map: Asset Manager The back of a man's head as he faces an asset manager in conversation. Asset Manager Position Title Asset Manager Alternate Title(s) Senior Financial Analyst Education & Training Level Advanced, Bachelors required, graduate degree often required Education & Training Level Description Asset managers must usually have a bachelor's degree and more than 5-10 years of experience in another business or financial occupation, such as a

  17. Future Energy Assets LP | Open Energy Information

    Open Energy Info (EERE)

    Assets LP Jump to: navigation, search Name: Future Energy Assets LP Place: Austin, Texas Zip: 78701 Product: String representation "Future Energy A ... S and in China." is too...

  18. Guinness Asset Management | Open Energy Information

    Open Energy Info (EERE)

    Guinness Asset Management Jump to: navigation, search Name: Guinness Asset Management Place: London, England, United Kingdom Zip: SW1H 9AA Product: String representation "UK based,...

  19. Century Asset Management | Open Energy Information

    Open Energy Info (EERE)

    Century Asset Management Jump to: navigation, search Name: Century Asset Management Place: Sydney, New South Wales, Australia Zip: 2000 Sector: Solar, Vehicles Product: String...

  20. EKO Asset Management Partners | Open Energy Information

    Open Energy Info (EERE)

    EKO Asset Management Partners Jump to: navigation, search Name: EKO Asset Management Partners Place: New York, New York Zip: 10019 Sector: Services Product: EKO is a specialised...

  1. Clean Energy Asset Management | Open Energy Information

    Open Energy Info (EERE)

    Asset Management Jump to: navigation, search Name: Clean Energy Asset Management Place: Santa Monica, California Zip: 94040 Sector: Efficiency, Renewable Energy Product: String...

  2. Building Energy Asset Score | Department of Energy

    Office of Environmental Management (EM)

    Energy Asset Score (Asset Score) is a national standardized tool for assessing the physical and structural energy efficiency of commercial and multifamily residential buildings. ...

  3. Life Cycle Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-10-14

    (The following directives are deleted or consolidated into this Order and shall be phased out as noted in Paragraph 2: DOE 1332.1A; DOE 4010.1A; DOE 4300.1C; DOE 4320.1B; DOE 4320.2A; DOE 4330.4B; DOE 4330.5; DOE 4540.1C; DOE 4700.1). This Order supersedes specific project management provisions within DOE O 430.1A, LIFE CYCLE ASSET MANAGEMENT. The specific paragraphs canceled by this Order are 6e(7); 7a(3); 7b(11) and (14); 7c(4),(6),(7),(11), and (16); 7d(4) and (8); 7e(3),(10), and (17); Attachment 1, Definitions (item 30 - Line Item Project, item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). The remainder of DOE O 430.1A remains in effect. Cancels DOE O 430.1. Canceled by DOE O 413.3.

  4. Chairs Meeting - October 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update by Doug Tonkay PDF icon Asset Revitalization Initiative Update by Cynthia Anderson and David Geiser More Documents & Publications Chairs Meeting - April 2012 Chairs ...

  5. Real Property and Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-09-24

    The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Cancels DOE O 430.1A Chg 1.

  6. Real Property and Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-09-24

    The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting and evaluation to the Department's multi-faceted missions. Successful implementation of this order will enable the Department to carry out stewardship responsibilities, and will ensure that facilities and infrastructure are properly sized and in a condition to meet our mission requirements today and in the future. Supersedes DOE O 430.1A Chg 1.

  7. Department of Energy Asset Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Asset Management Plan Department of Energy Asset Management Plan The Department of Energy Asset Management Plan (2015) provides an integrating strategy for ...

  8. Commercial Building Energy Asset Score 2013 Pilot

    Broader source: Energy.gov [DOE]

    DOE conducted its first pilot test of the Asset Score in 2012. Findings from that pilot led to improvements in the overall program and the Asset Scoring Tool. The tool was updated to include the...

  9. Capital Asset Project List.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. ... Start of Operations or Project Completion Capital Asset Project List 4112016 1 of 1

  10. Revitalized Board Lays Out New Path amid EM's Recent Underground Tank

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Successes | Department of Energy Revitalized Board Lays Out New Path amid EM's Recent Underground Tank Waste Successes Revitalized Board Lays Out New Path amid EM's Recent Underground Tank Waste Successes August 20, 2012 - 12:00pm Addthis Cement trucks transport a specially formulated grout that is pumped into two underground waste tanks at the Savannah River Site as part of work to close the massive structures. Cement trucks transport a specially formulated grout that is pumped into

  11. EM Contractors for Capital Asset Projects

    Broader source: Energy.gov [DOE]

    Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

  12. Real Property Asset Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Site & Facility Restoration » Facility Engineering » Real Property Asset Management Real Property Asset Management The Real Property Asset Management (RPAM) portion of Deactivation & Decommissioning/Facility Engineering (D&D/FE) presents a driving programmatic challenge within the EM-D&D Clean-up program effort which currently involves 114 sites with 4,900 buildings and other structures which currently account for 28 percent of the Department's assets. The overall

  13. Commercial Building Energy Asset Rating Workshop

    Broader source: Energy.gov [DOE]

    DOE commercial building energy asset rating program information presented to stakeholders at the workshop held in Washington, DC, December 2011

  14. ARI: Creating a 2020 DOE

    Broader source: Energy.gov [DOE]

    The Asset Revitalization Initiative (ARI) is a U.S. Department of Energy (DOE)-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities,...

  15. HANFORD SITE ASSETS AND ATTRIBUTES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HANFORD SITE ASSETS AND ATTRIBUTES The Hanford Site provides the opportunity for long-term sustainable energy and industry development. The area boasts a specialized workforce that is highly educated and well-established; is rich in resources including land, infrastructure, low-cost energy, and available workforce; more scientists and engineers per capita than any other area in the Pacific Northwest; and is an optimum location for the development of sustainable energy solutions. Land The Hanford

  16. Energy Department Launches New Clean Energy Manufacturing Initiative |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy New Clean Energy Manufacturing Initiative Energy Department Launches New Clean Energy Manufacturing Initiative March 26, 2013 - 10:56am Addthis News Media Contact (202) 586-4940 OAK RIDGE - As part of the Obama Administration's commitment to revitalizing America's manufacturing sector, today the Energy Department launched the Clean Energy Manufacturing Initiative (CEMI), a new Department initiative focused on growing American manufacturing of clean energy products and

  17. Port Asset Acquisition LLC | Open Energy Information

    Open Energy Info (EERE)

    Acquisition LLC Jump to: navigation, search Name: Port Asset Acquisition LLC Place: Louisiana Product: PAA was formed to acquire a fuel terminal, tanks and land in Alexandria,...

  18. ECO2 Asset Solutions | Open Energy Information

    Open Energy Info (EERE)

    Asset Solutions Place: Tampa, Florida Sector: Carbon, Services Product: Florida-based provider of advisory services to both buyers and sellers on the Carbon Markets. They serve a...

  19. Optimizing Asset Utilization and Operating Efficiency Efficiently...

    Broader source: Energy.gov (indexed) [DOE]

    Optimizing Asset Utilization and Operating Efficien Efficientl (55.31 KB) More Documents & Publications Metrics for Measuring Progress Toward Implementation of the Smart Grid (June ...

  20. ASSET LOGISTIC AG | Open Energy Information

    Open Energy Info (EERE)

    LOGISTIC AG Jump to: navigation, search Name: ASSET@LOGISTIC AG Place: Hamburg, Hamburg, Germany Zip: 20148 Sector: Wind energy Product: Developer of 3 wind farms in Almeria,...

  1. PADUCAH 2015 YEAR IN REVIEW

    Office of Environmental Management (EM)

    Overview Overview The Asset Revitalization Initiative (ARI) focuses on communicating past efforts and lessons learned from DOE's long history of asset revitalization and focus current and future efforts to improve the efficiency and effectiveness of future land, asset and facility transfer and beneficial reuse. Since the 1950's, DOE and its predecessor agencies have completed 95 transfers of approximately 25,500 acres of land, facilities and other assets for beneficial reuse, including excess

  2. Commercial Building Energy Asset Score Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score Program Commercial Building Energy Asset Score Program Fact sheet summarizing the Building Technologies Program's commercial building energy asset score program Commercial Building Energy Asset Score Program (987.18 KB) More Documents & Publications Commercial Building Energy Asset Score Sample Report Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) Commercial Building Asset Rating Program

  3. Asset Management Plan | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Asset Management Plan NNSA's Asset Management Program Completes First Pilot The National Nuclear Security Administration (NNSA) today announced completion of a $520k pilot to replace a roof, as well as heating, ventilation and cooling (HVAC) system for the Core Library and Data Center at Mercury, Nevada (http://nevada.usgs.gov/mercury/). The library was established

  4. Building Energy Asset Score: Real Estate Managers

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifies opportunities for users to invest in energy efficiency upgrades. It is web-based and free to use.

  5. Demonstration and Validation Assets: User Manual Development

    SciTech Connect (OSTI)

    2008-06-30

    This report documents the development of a database-supported user manual for DEMVAL assets in the NSTI area of operations and focuses on providing comprehensive user information on DEMVAL assets serving businesses with national security technology applications in southern New Mexico. The DEMVAL asset program is being developed as part of the NSPP, funded by both Department of Energy (DOE) and NNSA. This report describes the development of a comprehensive user manual system for delivering indexed DEMVAL asset information to be used in marketing and visibility materials and to NSTI clients, prospective clients, stakeholders, and any person or organization seeking it. The data about area DEMVAL asset providers are organized in an SQL database with updateable application structure that optimizes ease of access and customizes search ability for the user.

  6. EA-329 Sierra Power Asset Marketing, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Sierra Power Asset Marketing, LLC EA-329 Sierra Power Asset Marketing, LLC Order authorizing Sierra Power Asset Marketing, LLC to export electric energy to Canada EA-329 Sierra ...

  7. Building Energy Asset Score Frequently Asked Questions | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Commercial Buildings » Analysis Tools » Energy Asset Score » Building Energy Asset Score Frequently Asked Questions Building Energy Asset Score Frequently Asked Questions This page features answers to the most frequently asked questions about the Building Energy Asset Score. Choose from the list of questions below to learn more: Program Overview What is the Building Energy Asset Score? The Building Energy Asset Score is a national standardized tool for assessing the physical and

  8. Newly Developed IT Asset Tools Enhance Cybersecurity Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Newly Developed IT Asset Tools Enhance Cybersecurity Innovation Newly Developed IT Asset Tools Enhance Cybersecurity Innovation November 25, 2014 - 3:00pm Addthis The Office of the...

  9. Ricmore Capital PLC Formerly Energy Asset Management Plc | Open...

    Open Energy Info (EERE)

    Ricmore Capital PLC Formerly Energy Asset Management Plc Jump to: navigation, search Name: Ricmore Capital PLC (Formerly Energy Asset Management Plc) Place: United Kingdom Sector:...

  10. Program & Project Management For The Acquisition Of Capital Assets...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  11. Guidelines for Provision and Interchange of Geothermal Data Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines for Provision and Interchange of Geothermal Data Assets Guidelines for Provision and Interchange of Geothermal Data Assets This document presents guidelines related to ...

  12. Microsoft Word - EM SSAB Chairs Asset Retention Recommendation2011...

    Office of Environmental Management (EM)

    that DOE identify these unique assets. Further, we recommend that DOE and stakeholders (e.g. local communities, tribal governments, and the public) review these unique assets for...

  13. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets 2014 DOE Project Management Workshop ...

  14. Commercial Building Energy Asset Score - 2014 BTO Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Asset Score - 2014 BTO Peer Review Commercial Building Energy Asset Score - 2014 ... energy efficiency in the commercial building sector is that building owners and ...

  15. Commercial Building Energy Asset Scoring Tool 2013 Pilot Training...

    Broader source: Energy.gov (indexed) [DOE]

    Session More Documents & Publications Commercial Building Energy Asset Scoring Tool Application Programming Interface Commercial Building Energy Asset Score: 2013 Pilot Overview...

  16. Microsoft PowerPoint - 2013_2-22_Waste_Management_Symposium_-_T._Smith_ARI_Creating_a_2020_DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Revitalization Initiative Goals, Task Force, and Deliverables Tania Smith, DOE-EM ARI Task Force Leader February 2013 ARI Mission The Asset Revitalization Initiative (ARI) is a U.S. Department of Energy (DOE)-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources, and a highly skilled workforce. ARI promotes a more efficient business environment to encourage collaboration

  17. Capital Asset Project List.xls

    Broader source: Energy.gov (indexed) [DOE]

    as defined by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. CD0 Approve Mission Need CD1 Approve Alternative Selection and Cost Range CD2...

  18. Commercial Building Energy Asset Score 2013 Pilot

    Broader source: Energy.gov [DOE]

    DOE and the Pacific Northwest National Laboratory (PNNL) hosted a series of webinars for interested Pilot Participants to review requirements for participating in the 2013 Pilot and on how to use the Asset Scoring Tool. 

  19. emergency response assets | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    emergency response assets Federal Radiological Monitoring and Assessment Center The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal asset available on request by the Department of Homeland Security (DHS) and state and local agencies to respond to a nuclear or radiological incident. The FRMAC is an interagency organization with representation... Radiation Emergency Assistance Center / Training Site NNSA's Radiation Emergency Assistance Center / Training Site (REAC/TS)

  20. DOE - NNSA/NFO -- FRMAC Assets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assets NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office FRMAC Assets Photograph of Helicopter In addition to highly skilled and well-trained professionals, the significant capabilities provided by the U. S. Department of Energy (DOE) and its contractors include atmospheric transport modeling, radiation monitoring, radiation analysis, data assessment, and medical advice for radiation injuries. To support Federal Radiological Monitoring and Assessment Center (FRMAC) operations, the

  1. Commercial Building Energy Asset Score 2013 Pilot | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score 2013 Pilot Commercial Building Energy Asset Score 2013 Pilot This webinar covers the overall objectives of the 2013 Pilot and the process for pilot participation. asset_score_pilot_overview_webinar_061713.wmv (31.87 MB) More Documents & Publications Commercial Building Energy Asset Score 2013 Pilot Asset Score API Webinar June 14, 2013

  2. The Department of Energy Asset Management Plan (2015) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy The Department of Energy Asset Management Plan (2015) The Department of Energy Asset Management Plan (2015) Asset Management Plan_Final_w S-2 distro memo_2015.05.26.pdf (10.66 MB) More Documents & Publications Department of Energy Asset Management Plan cover_booked.indd Three-year Rolling Timeline

  3. DOE Commercial Building Energy Asset Score Web Service (Draft)

    SciTech Connect (OSTI)

    Elliott, Geoffrey; Wang, Na

    2013-09-30

    Documentation of the DOE Commercial Building Energy Asset Score application programming interface (API).

  4. Asset Score API Webinar June 14, 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    API Webinar June 14, 2013 Asset Score API Webinar June 14, 2013 asset_score_api_webinar_061413.wmv (45.39 MB) More Documents & Publications Commercial Building Energy Asset Score 2013 Pilot Commercial Building Energy Asset Score 2013 Pilot distance_webinar_2013_03_05.wmv

  5. Energy Department Announces New Asset Score Partnership Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Asset Score Partnership Program Energy Department Announces New Asset Score Partnership Program February 11, 2016 - 1:30pm Addthis The U.S. Department of Energy (DOE) today announced partnerships with 21 companies, federal agencies, and state and local governments to promote the use of DOE's Building Energy Asset Scoring Tool (the Asset Score). The Asset Score, first released in 2014, is a free, web-based software tool that identifies opportunities to improve the energy

  6. Training for Tribal Asset Building: Leveraging Resources

    Broader source: Energy.gov [DOE]

    The Native Learning Center is hosting a training on tribal asset building: leveraging resources. Native Businesses strengthen tribal community and examines Indian entrepreneurship from program counseling and finding credit to understanding contracting opportunities that expand tribal economies. Registration is free for Native Americans. Please book before August 25.

  7. Capital Asset Project List_rev1.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. ... Start of Operations or Project Completion Capital Asset Project List 1152016 1 of 1

  8. ASM Asset Management DTVM SA | Open Energy Information

    Open Energy Info (EERE)

    Asset Management DTVM SA Jump to: navigation, search Name: ASM Asset Management DTVM SA Place: Rio de Janeiro, Rio de Janeiro, Brazil Zip: 22640-100 Sector: Carbon, Services...

  9. Pulse Asset Management GmbH | Open Energy Information

    Open Energy Info (EERE)

    Asset Management GmbH Jump to: navigation, search Name: Pulse Asset Management GmbH Place: Hamburg, Germany Zip: 20354 Sector: Solar Product: Hamburg-based investor in solar...

  10. The Department's real property assets are vital to the accomplishment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Department&8217;s real property assets are vital to the accomplishment of its mission The Department&8217;s real property assets are vital to the accomplishment of its mission ...

  11. Commercial Building Energy Asset Score 2013 Pilot Data Collection Form |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Pilot Data Collection Form Commercial Building Energy Asset Score 2013 Pilot Data Collection Form This form is intended to facilitate your data collection. The Energy Asset Scoring Tool uses the "block" concept to simplify your building geometry. Most buildings can be scored as one block Commercial Building Energy Asset Score 2013 Pilot Data Collection Form (413.16 KB) More Documents & Publications Commercial Building Energy Asset Score Sample Report

  12. Commercial Building Energy Asset Score: Pilot Findings and Program Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Score: Pilot Findings and Program Update Commercial Building Energy Asset Score: Pilot Findings and Program Update The webinar was held on April 16, 2014, to share the findings from the 2013 Pilot and provide a program update on the Commercial Building Energy Asset Score. Presentation (1.74 MB) More Documents & Publications Commercial Building Energy Asset Rating HES Program Update and Scoring Tool v2014 Release Commercial Building Energy Asset Score: 2013 Pilot

  13. Asset Score National Leadership Network | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Score National Leadership Network Asset Score National Leadership Network The White House and DOE announce the Asset Score National Leadership Network at the Eisenhower Executive Office Building in Washington, D.C., on Jan. 28, 2016. Photo Credit: Amy Konigsburg, U.S. Department of Energy The White House and DOE announce the Asset Score National Leadership Network at the Eisenhower Executive Office Building in Washington, D.C., on Jan. 28, 2016. Photo Credit: Amy Konigsburg, U.S.

  14. Building Energy Asset Score: Utilities and Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utilities and Energy Efficiency Program Administrators Building Energy Asset Score: ... and structural energy efficiency of commercial and multifamily residential buildings. ...

  15. Asset Score Webinar Slides: Energy Efficiency Services Companies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Services Companies Asset Score Webinar Slides: Energy Efficiency ... and structural energy efficiency of commercial and multifamily residential buildings. ...

  16. Commercial Building Energy Asset Scoring Tool 2013 Pilot Training Session

    Office of Energy Efficiency and Renewable Energy (EERE)

    overview of the June 18, 2013 pilot training session for the Commercial Building Energy Asset Scoring Tool

  17. Commercial Building Energy Asset Scoring Tool Application Programming Interface

    Office of Energy Efficiency and Renewable Energy (EERE)

    slides from June 14, 2013 webinar on the commercial building energy asset scoring tool application programming interface

  18. Commercial Building Energy Asset Score Program Development | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Analysis Tools » Energy Asset Score » Commercial Building Energy Asset Score Program Development Commercial Building Energy Asset Score Program Development To develop the Asset Score, DOE issued public Requests for Information (RFIs) and completed pilot testing with users. DOE also commissioned analyses from the Pacific Northwest National Laboratory and the National Renewable Energy Laboratory to inform the technical design, scoring methodology, and other features of the tool.

  19. Program and Project Management for the Acquisition of Capital Assets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Program and Project Management for the Acquisition of Capital Assets Program and Project Management for the Acquisition of Capital Assets This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. Program and Project Management for the Acquisition of Capital Assets More Documents & Publications Guiding

  20. Asset Utilization Index (AUI) Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Utilization Index (AUI) Guidance Asset Utilization Index (AUI) Guidance AUI Guidance_090227.pdf (40.37 KB) More Documents & Publications Three Year Rolling Timeline The Department’s real property assets are vital to the accomplishment of its mission Three-year Rolling Timeline

  1. ARI Task Force, ECA Work to Stimulate Regional Economies

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE’s Asset Revitalization Initiative (ARI) Task Force met with the Energy Communities Alliance (ECA) this week to advance the Department’s processes for transferring excess land...

  2. Microsoft PowerPoint - 2013_2-22_Waste_Management_Symposium_...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Revitalization Initiative Goals, Task Force, and Deliverables Tania Smith, DOE-EM ... Contact Information: Tania Smith, DOE-EM ARI Task Force Co-Lead 202-586-5008 ...

  3. COMMUNITY CAPACITY BUILDING FOR REVITALIZATION AND SUSTAINABLE REDEVELOPMENT

    SciTech Connect (OSTI)

    Downing, Melinda; Rosenthall, John; Hudson, Michelle

    2003-02-27

    Capacity building programs help poor and disadvantaged communities to improve their ability to participate in the environmental decision-making processes. They encourage citizen involvement, and provide the tools that enable them to do so. Capacity building enables communities that would otherwise be excluded to participate in the process, leading to better, and more just decisions. The Department of Energy (DOE) continues to be committed to promoting environmental justice and involving its stakeholders more directly in the planning and decision-making process for environmental cleanup. DOE's Environmental Management Program (EM) is in full support of this commitment. Through its environmental justice project, EM provides communities with the capacity to effectively contribute to a complex technical decision-making process by furnishing access to computers, the Internet, training and technical assistance. DOE's Dr. Samuel P. Massie Chairs of Excellence Program (Massie Chairs) function as technical advisors to many of these community projects. The Massie Chairs consist of nationally and internationally recognized engineers and scientists from nine Historically Black Colleges and Universities (HBCUs) and one Hispanic Serving Institution (HIS). This paper will discuss capacity building initiatives in various jurisdictions.

  4. Nuclear Materials: Reconsidering Wastes and Assets - 13193

    SciTech Connect (OSTI)

    Michalske, T.A.

    2013-07-01

    The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable ('assets') to worthless ('wastes'). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or - in the case of high level waste - awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site's (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as 'waste' include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest. (authors)

  5. Test and Demonstration Assets of New Mexico

    SciTech Connect (OSTI)

    2008-03-31

    This document was developed by the Arrowhead Center of New Mexico State University as part of the National Security Preparedness Project (NSPP), funded by a DOE/NNSA grant. The NSPP has three primary components: business incubation, workforce development, and technology demonstration and validation. The document contains a survey of test and demonstration assets in New Mexico available for external users such as small businesses with security technologies under development. Demonstration and validation of national security technologies created by incubator sources, as well as other sources, are critical phases of technology development. The NSPP will support the utilization of an integrated demonstration and validation environment.

  6. Marine asset security and tracking (MAST) system

    DOE Patents [OSTI]

    Hanson, Gregory Richard; Smith, Stephen Fulton; Moore, Michael Roy; Dobson, Eric Lesley; Blair, Jeffrey Scott; Duncan, Christopher Allen; Lenarduzzi, Roberto

    2008-07-01

    Methods and apparatus are described for marine asset security and tracking (MAST). A method includes transmitting identification data, location data and environmental state sensor data from a radio frequency tag. An apparatus includes a radio frequency tag that transmits identification data, location data and environmental state sensor data. Another method includes transmitting identification data and location data from a radio frequency tag using hybrid spread-spectrum modulation. Another apparatus includes a radio frequency tag that transmits both identification data and location data using hybrid spread-spectrum modulation.

  7. Marketing Plan for Demonstration and Validation Assets

    SciTech Connect (OSTI)

    2008-05-30

    The National Security Preparedness Project (NSPP), is to be sustained by various programs, including technology demonstration and evaluation (DEMVAL). This project assists companies in developing technologies under the National Security Technology Incubator program (NSTI) through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. This report documents the DEMVAL marketing and visibility plan, which will focus on collecting information about, and expanding the visibility of, DEMVAL assets serving businesses with national security technology applications in southern New Mexico.

  8. Opportunities & Challenges for Microgrids and Distributed Energy Resources as a Grid Asset

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Challenges for Microgrids and Distributed Energy Resources as a Grid Asset Dispatchable Distributed Generation: Manufacturing's Role in Support of Grid Modernization Byron Washom, Director Strategic Energy Initiatives UC San Diego February 11, 2016 CA's future electricity system will consist of near zero net energy buildings, highly efficient businesses, low- carbon generation, sustainable bioenergy systems, more localized generation, and electrification of transportation, supported by a

  9. U.S. DOE Commercial Building Energy Asset Score | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. DOE Commercial Building Energy Asset Score U.S. DOE Commercial Building Energy Asset Score provides quick start intstructions for creating a commercial building energy asset score Commercial Building Energy Asset Score: Quick Start Guide (204.87 KB) More Documents & Publications Commercial Building Energy Asset Score: Pilot Findings and Program Update Commercial Building Energy Asset Score Program Building Energy Asset Score

  10. Building Energy Asset Score: Architects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Architects Building Energy Asset Score: Architects The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifices opportunities for users to invest in energy efficiency upgrades. It is web-based and free to use. View additional information

  11. Building Energy Asset Score: Building Owners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Owners Building Energy Asset Score: Building Owners The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifies opportunities for users to invest in energy efficiency upgrades. It is web-based and free to use. View information

  12. Building Energy Asset Score: Energy Services Companies, Engineers and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consultants | Department of Energy Energy Services Companies, Engineers and Consultants Building Energy Asset Score: Energy Services Companies, Engineers and Consultants The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifies

  13. Building Energy Asset Score: State and Local Governments | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy State and Local Governments Building Energy Asset Score: State and Local Governments The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and identifies opportunities for users to invest in energy efficiency upgrades. It is web-based

  14. Building Energy Asset Score: Utilities and Energy Efficiency Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrators | Department of Energy Utilities and Energy Efficiency Program Administrators Building Energy Asset Score: Utilities and Energy Efficiency Program Administrators The U.S. Department of Energy's Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. The Asset Score generates a simple energy efficiency rating that enables comparison among buildings, and

  15. Commercial Building Energy Asset Score: 2013 Pilot Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Building Energy Asset Score: 2013 Pilot Overview June 17, 2013 Joan Glickman, DOE Patty Kappaz, SRA 1 eere.energy.gov Agenda � Team Introduction � Commercial Building Energy Asset Score Update * Program overview * Progress to date * Objectives of the 2013 Pilot * Future plans � Process for Pilot Participation 2 I Energy Asset Score eere.energy.gov � � � � � � � Meet the Team U.S. Department of Energy (DOE) Project oversight Strategic direction Policy perspective

  16. DOE Commercial Building Energy Asset Score: Software Development for Phase

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Building Types | Department of Energy Score: Software Development for Phase II Building Types DOE Commercial Building Energy Asset Score: Software Development for Phase II Building Types DOE Commercial Building Energy Asset Score: Software Development for Phase II Building Types asset_score_assumptions_july_2013.pdf (534.26 KB) More Documents & Publications Weekend/Weekday Ozone Study in the South Coast Air Basin Users Perspective on Advanced Fuel Cell Bus Technology Vehicle

  17. Assets in Action Community Award nominations open until December 17

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assets in Action Community Award Nominations Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Assets in Action Community Award nominations open until December 17 If you know people who support building a strong community for youth in Los Alamos, nominate them for an Assets in Action Community Award. January 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email

  18. Optimizing Asset Utilization and Operating Efficiency Efficiently, June

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 | Department of Energy Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Smart Grid Implementation Workshop Breakout Group Report, a discussion of metrics for smart grid implementation. The following major caveats and findings were identified: Optimizing asset utilization and operating efficiently depends on proper integration of technologies with business processes and associated IT

  19. Department of Energy Asset Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Management Plan Department of Energy Asset Management Plan The Department of Energy Asset Management Plan (2015) provides an integrating strategy for supporting the management and performance goals in the Department's Strategic Plan; fulfilling Federal requirements governing the acquisition, management, and disposal of property; and conducting activities in a manner that provides the best value for the American taxpayers. The guiding principles ensure the Department's portfolio of real and

  20. V-161: IBM Maximo Asset Management Products Java Multiple Vulnerabilities

    Broader source: Energy.gov [DOE]

    Asset and Service Mgmt Products - Potential security exposure when using JavaTM based applications due to vulnerabilities in Java Software Developer Kits.

  1. Commercial Building Energy Asset Scoring Tool Application Programming...

    Broader source: Energy.gov (indexed) [DOE]

    Application Programming Interface NORA WANG GEOFF ELLIOTT JUSTIN ALMQUIST EDWARD ELLIS Pacific Northwest National Laboratory JUNE 14, 2013 Commercial Building Energy Asset Score...

  2. Delegation of Acquisition Executive Authority for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project by cooper DelegationAcquisitionExecAuthorityCapitalAssetProjectsIDCleanupProject-CooperEM.pdf -- PDF Document, 256 KB ID: NA Type: Organizations' Assignment...

  3. DOE Commercial Building Energy Asset Rating Program Focus Groups...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    assetratingseattlefocusgroups.pdf More Documents & Publications Commercial Building Energy Asset Rating Workshop A Common Definition for Zero Energy Buildings Building Energy ...

  4. DOE Commercial Building Energy Asset Score: Software Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Score: Software Development for Phase II Building Types DOE Commercial Building Energy Asset Score: Software Development for Phase II Building Types DOE Commercial Building Energy ...

  5. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets (310.65 KB) More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB ...

  6. Building Energy Asset Score: Energy Services Companies, Engineers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Energy Asset Score is a national standardized tool for evaluating the physical and structural energy efficiency of commercial and multifamily residential buildings. ...

  7. Land and Asset Transfer for Beneficial Reuse | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Land and Asset Transfer for Beneficial Reuse More Documents & Publications EA-0531: Final Environmental Assessment EIS-0068: Final Environmental Impact Statement EA-1008: ...

  8. Commercial Building Energy Asset Scoring Tool Application Programming...

    Broader source: Energy.gov (indexed) [DOE]

    14, 2013 webinar on the commercial building energy asset scoring tool application programming interface Application Programming Interface Webinar More Documents & Publications...

  9. Guidelines for Provision and Interchange of Geothermal Data Assets

    Broader source: Energy.gov [DOE]

    This document presents guidelines related to provision and interchange of data assets in the context of the National Geothermal Data System.

  10. North Brawley Power Plant Asset Impairment Analysis | Open Energy...

    Open Energy Info (EERE)

    2012 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for North Brawley Power Plant Asset Impairment Analysis Citation Giza Singer...

  11. Newly Developed IT Asset Tools Enhance Cybersecurity Innovation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of the Chief Information Officer (OCIO) has leveraged its own IT Asset Management (ITAM) data to further enhance Department of Energy (DOE) cybersecurity awareness and ...

  12. Commercial Building Energy Asset Scoring Tool 2013 Pilot Training...

    Broader source: Energy.gov (indexed) [DOE]

    upgrade opportunities (best practice, general implementation guide, etc.) Updated scoring method (to be finalized) June 20, 2013 4 5 Asset Scoring Tool June 20, 2013 Apply...

  13. Statement on Department of Energy's Major System Capital Asset...

    National Nuclear Security Administration (NNSA)

    Department of Energy's Major System Capital Asset Projects before the House Committee on Appropriations Subcommittee on Energy & Water Development March 20, 2013 INTRODUCTION ...

  14. Guiding Principles of Real Property Asset Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding Principles of Real Property Asset Management Guiding Principles of Real Property Asset Management frpc_guidance_final.pdf (318.72 KB) More Documents & Publications 2015 Federal Real Property Council Reporting Guidance FRPC User Guidance -for FY2006 FRPC User Guidance -for FY2006

  15. DOE Commercial Building Energy Asset Rating Program Focus Groups with

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Primary Stakeholders in Seattle -- Final Report | Department of Energy asset_rating_seattle_focus_groups.pdf (10.22 MB) More Documents & Publications Commercial Building Energy Asset Rating Workshop A Common Definition for Zero Energy Buildings Building Energy Rating and Disclosure Policies

  16. Texas - 43-TAC-21 - Leasing of Highway Assets | Open Energy Informatio...

    Open Energy Info (EERE)

    Texas - 43-TAC-21 - Leasing of Highway AssetsLegal Abstract This section sets forth the requirements and procedures for the leasing of highway assets by the Texas...

  17. Commercial Buildings: Asset Scoring Efforts and Request for Information: February 2013 webinar

    Broader source: Energy.gov [DOE]

    webinar providing an overview of the commercial building energy asset program, the energy asset scoring tool, and a recently issued RFI

  18. Asset Score Webinar Slides: Real Estate and Design Professionals

    Broader source: Energy.gov [DOE]

    The Asset Score is a free, web-based software tool developed by DOE and the Pacific Northwest National Laboratory (PNNL) that assesses the physical and structural energy efficiency of commercial and multifamily residential buildings. It generates a simple energy efficiency rating that enables comparison among buildings, and identifies custom opportunities to invest in energy efficiency upgrades. The Asset Score has already been used, or is in the process of being used, on more than 600 buildings nationwide. This Asset Score webinar is aimed at an audience of real estate and design professionals.

  19. FGD betterment: Asset preservation and revenue generation

    SciTech Connect (OSTI)

    Anderson, G.A.; Boward, W.L. Jr.; Gaikwad, R.P.

    1996-12-31

    Phase I of the Clean Air Act Amendments (CAAA) of 1990 is complete. A mix of technologies and compliance strategies were used by the subject utilities to meet their obligations at the lowest evaluated cost. Phase II of the CAAA, which begins in the year 2000, will require utilities to bring their systems into compliance while reducing their overall SO{sub 2} emissions by 4.4 million tons nationwide. However, considering some of the utilities` overcompliance in Phase I, the overall reduction that needs to be achieved in Phase II could be as low as 2 million tons. The economic and business factors that influenced the compliance technology decisions in Phase I are similar to the economic and business factors that will influence both Phase II decisions and asset preservation on existing systems. While there was a mixture of technologies used in Phase I compliance, the uncertainty over allowance pricing and the overall economic climate favored low capital intensive solutions. Most Utilities chose to fuel switch. Many fewer utilities chose to install flue gas desulfurization (FGD) systems than was previously projected. Phase II of the CAAA is likely to continue to favor low capital invenstive solutions since allowance uncertainty continues to be a factor and electric utility restructuring promises continued business uncertainty.

  20. Commercial Building Energy Asset Score: Pilot Findings and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Building Energy Asset Score: Pilot Findings and Program Update The webinar was held on April 16, 2014, to share the findings from the 2013 Pilot and provide a program ...

  1. Delegation of Acquisition Executive Authority for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Oak Ridge Office by whitney Delegation-AcquisitionExecAuthorityforCapitalAsset Projects-OR-WhitneyEM.pdf -- PDF Document, 627 KB ID: NA Type: Organizations' Assignment of...

  2. 2015-09-25 Capital Asset Project List.xls

    Broader source: Energy.gov (indexed) [DOE]

    as defined by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. CD-0 Approve Mission Need CD-1 Approve Alternative Selection and Cost Range...

  3. Delegation of Acquisition Executive Authority for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Related to: DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets There is no history to display for this document. Document Actions Print this...

  4. BPA selects new VP of Transmission Planning and Asset Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the electric utility industry and am honored to lead our Transmission Planning and Asset Management team." Cook came to BPA in March of 2004 as an electrical engineer for its...

  5. Luxcara Asset Management GmbH | Open Energy Information

    Open Energy Info (EERE)

    investment solutions in the field of renewable energy, with a special focus on photovoltaics. References: Luxcara Asset Management GmbH1 This article is a stub. You can help...

  6. Commercial Building Energy Asset Score 2013 Pilot Data Collection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This form is intended to facilitate your data collection. The Energy Asset Scoring Tool uses the "block" concept to simplify your building geometry. Most buildings can be scored as ...

  7. Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-03-28

    The purpose of this Manual is to provide requirements and guidance to Department of Energy (DOE) employees, including National Nuclear Security Administration (NNSA) employees on the planning and acquisition of capital assets. Does not cancel other directives.

  8. SeaWest Northwest Asset Holdings LLC | Open Energy Information

    Open Energy Info (EERE)

    Holdings LLC Place: Oregon Sector: Wind energy Product: Part owner and operator of the Condon Wind Project. References: SeaWest Northwest Asset Holdings LLC1 This article is a...

  9. Microsoft Word - Optimizes Assets Operates Efficiently_APPROVED...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... They are hampered by a lack of the asset condition information needed for an optimal ... Two-way power flow capability and the participation of willing consumers who offer their ...

  10. State and Regional Energy Risk Assessment Initiative

    Broader source: Energy.gov [DOE]

    OE is leading a State and Regional Energy Risk Assessment Initiative to help States better understand risks to their energy infrastructure so they can be better prepared to make informed decisions about their investments, resilience and hardening strategies, and asset management. As part of this Initiative, OE has developed a series of State and Regional Energy Risk Profiles that examine the relative magnitude of the risks that each State's energy infrastructure routinely encounters in comparison with the probable impacts.

  11. NNSA's Asset Management Program Completes First Pilot | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) NNSA's Asset Management Program Completes First Pilot December 22, 2015 Asset Management Program implementation team. The National Nuclear Security Administration (NNSA) today announced completion of a $520k pilot to replace a roof, as well as heating, ventilation and cooling (HVAC) system for the Core Library and Data Center at Mercury, Nevada (http://nevada.usgs.gov/mercury/). The library was established as a repository for geologic, hydrologic, and

  12. Lab subcontractor a major asset to Northern New Mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Subcontractor Major Asset To Northern New Mexico Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Lab subcontractor a major asset to Northern New Mexico Adelante Consulting, Inc. holds Laboratory contracts for environmental work and supports more than 30 regional nonprofit organizations. August 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community

  13. Commercial Building Energy Asset Rating Program -- Market Research

    SciTech Connect (OSTI)

    McCabe, Molly J.; Wang, Na

    2012-04-19

    Under contract to Pacific Northwest National Laboratory, HaydenTanner, LLC conducted an in-depth analysis of the potential market value of a commercial building energy asset rating program for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy. The market research objectives were to: (1) Evaluate market interest and need for a program and tool to offer asset rating and rapidly identify potential energy efficiency measures for the commercial building sector. (2) Identify key input variables and asset rating outputs that would facilitate increased investment in energy efficiency. (3) Assess best practices and lessons learned from existing national and international energy rating programs. (4) Identify core messaging to motivate owners, investors, financiers, and others in the real estate sector to adopt a voluntary asset rating program and, as a consequence, deploy high-performance strategies and technologies across new and existing buildings. (5) Identify leverage factors and incentives that facilitate increased investment in these buildings. To meet these objectives, work consisted of a review of the relevant literature, examination of existing and emergent asset and operational rating systems, interviews with industry stakeholders, and an evaluation of the value implication of an asset label on asset valuation. This report documents the analysis methodology and findings, conclusion, and recommendations. Its intent is to support and inform the DOE Office of Energy Efficiency and Renewable Energy on the market need and potential value impacts of an asset labeling and diagnostic tool to encourage high-performance new buildings and building efficiency retrofit projects.

  14. Asset Score Webinar Slides: Energy Efficiency Services Companies |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy Efficiency Services Companies Asset Score Webinar Slides: Energy Efficiency Services Companies The Asset Score is a free, web-based software tool developed by DOE and the Pacific Northwest National Laboratory (PNNL) that assesses the physical and structural energy efficiency of commercial and multifamily residential buildings. It generates a simple energy efficiency rating that enables comparison among buildings, and identifies custom opportunities to invest in

  15. Program and Project Management for the Acquisition of Capital Assets -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Directives, Delegations, and Requirements B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement, Program Management The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of

  16. Digital Twins of physical assets prevents unplanned downtime | GE Global

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research a 'Digital Twin' for physical assets can help achieve no unplanned downtime Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) How a 'Digital Twin' for physical assets can help achieve no unplanned downtime Mark Grabb and Matt Nielsen, data scientists at GE Global Research, explain the importance of data

  17. Petascale Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Petascale Initiative Exascale Computing APEX Home » R & D » Archive » Petascale Initiative Petascale Initiative Alice Koniges (third from left) led the Computational Science and Engineering Petascale Initiative, which paired post-doctoral researchers with high-impact projects at NERSC. Post-docs pictured above are (from left) are Jihan Kim, Filipe Maia, Robert Preissl, Brian Austin, Wangyi (Bobby) Liu , Kirsten Fagnan and Praveen Narayanan. (Not pictured: Christos Kavouklis, Xuefei

  18. Uranium Management - Preservation of a National Asset

    SciTech Connect (OSTI)

    Jackson, J. D.; Stroud, J. C.

    2002-02-27

    The Uranium Management Group (UMG) was established at the Department of Energy's (DOE's) Oak Ridge Operations in 1999 as a mechanism to expedite the de-inventory of surplus uranium from the Fernald Environmental Management Project site. This successful initial venture has broadened into providing uranium material de-inventory and consolidation support to the Hanford site as well as retrieving uranium materials that the Department had previously provided to universities under the loan/lease program. As of December 31, 2001, {approx} 4,300 metric tons of uranium (MTU) have been consolidated into a more cost effective interim storage location at the Portsmouth site near Piketon, OH. The UMG continues to uphold its corporate support mission by promoting the Nuclear Materials Stewardship Initiative (NMSI) and the twenty-five (25) action items of the Integrated Nuclear Materials Management Plan (1). Before additional consolidation efforts may commence to remove excess inventory from Environmental Management closure sites and universities, a Programmatic Environmental Assessment (PEA) must be completed. Two (2) noteworthy efforts currently being pursued involve the investigation of re-use opportunities for surplus uranium materials and the recovery of usable uranium from the shutdown Portsmouth cascade. In summary, the UMG is available as a DOE complex-wide technical resource to promote the responsible management of surplus uranium.

  19. Commercial Building Energy Asset Rating Tool User's Guide

    SciTech Connect (OSTI)

    Wang, Na; Makhmalbaf, Atefe; Matsumoto, Steven W.

    2012-05-01

    The U.S. Department of Energy’s Commercial Building Energy Asset Rating Tool is a web-based system that is designed to allow building owners, managers, and operators to more accurately assess the energy performance of their commercial buildings. This document provide a step-by-step instruction on how to use the tool.

  20. Memoranda from the Secretary and the Office of Asset Management

    Broader source: Energy.gov [DOE]

    These memorandums provide clarification and direction to the Department as signed by the Secretary and further issued by the Director of the Department’s Office of Asset Management (MA-50), this memorandum affirms the Department’s commitment to protecting pollinators and enhancing their habitat, as appropriate, in all stages of a real property asset’s life cycle.

  1. DOE Building Energy Asset Score: Overview and Deployment Webinar-- Text Version

    Broader source: Energy.gov [DOE]

    Below is the text version of the webinar DOE Building Energy Asset Score: Overview and Deployment, presented in March 2015.

  2. Projects & Initiatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expand Finance & Rates Involvement & Outreach Expand Involvement & Outreach Doing Business Expand Doing Business Skip navigation links Initiatives Columbia River Treaty Non...

  3. Guidelines for Provision and Interchange of Geothermal Data Assets

    SciTech Connect (OSTI)

    none,

    2014-07-03

    The US Department of Energy Office of Geothermal Technologies (OGT) is funding and overseeing the development of the National Geothermal Data System (NGDS), a distributed information system providing access to integrated data in support of, and generated in, all phases of geothermal development. NGDS is being built in an open paradigm and will employ state-of-the-art informatics approaches and capabilities to advance the state of geothermal knowledge in the US. This document presents guidelines related to provision and interchange of data assets in the context of the National Geothermal Data System. It identifies general specifications for NGDS catalog metadata and data content, and provides specific instructions for preparation and submission of data assets by OGT-funded projects.

  4. Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 30.1B, REAL PROPERTY ASSET MANAGEMENT Order Module--DOE O 430.1B, REAL PROPERTY ASSET MANAGEMENT "The objective of DOE O 430.1B, Real Property Asset Management, is to establish a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real property asset planning, programming, budgeting, and evaluation to program mission projections and performance outcomes. To accomplish the objective, this Order identifies requirements and

  5. Guidelines for Provision and Interchange of Geothermal Data Assets

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines for Provision and Interchange of Geothermal Data Assets Supporting Advancement of Geothermal by Populating the DOE Geothermal Data Repository, a Node on the National Geothermal Data System US Department of Energy Geothermal Technologies Office January 27, 2016 Version 3.4 The National Geothermal Data System (NGDS) is a distributed information system providing access to integrated data in support of, and generated in, all phases of geothermal development. DOE's Geothermal Data

  6. Online Monitoring of Plant Assets in the Nuclear Industry

    SciTech Connect (OSTI)

    Nancy Lybeck; Vivek Agarwal; Binh Pham; Richard Rusaw; Randy Bickford

    2013-10-01

    Today’s online monitoring technologies provide opportunities to perform predictive and proactive health management of assets within many different industries, in particular the defense and aerospace industries. The nuclear industry can leverage these technologies to enhance safety, productivity, and reliability of the aging fleet of existing nuclear power plants. The U.S. Department of Energy’s Light Water Reactor Sustainability Program is collaborating with the Electric Power Research Institute’s (EPRI’s) Long-Term Operations program to implement online monitoring in existing nuclear power plants. Proactive online monitoring in the nuclear industry is being explored using EPRI’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software, a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. This paper focuses on development of asset fault signatures used to assess the health status of generator step-up transformers and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive features based on technical examinations that can be used to detect a specific fault type. Fault signatures are developed based on the results of detailed technical research and on the knowledge and experience of technical experts. The Diagnostic Advisor of the FW-PHM Suite software matches developed fault signatures with operational data to provide early identification of critical faults and troubleshooting advice that could be used to distinguish between faults with similar symptoms. This research is important as it will support the automation of predictive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

  7. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-07-28

    The Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. The page change incorporates requirements of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 413.3. Canceled by DOE O 413.3B dated 11-29-10.

  8. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-18

    To provide the Department of Energy (DOE), including the National Nuclear Security Administration, with project management direction for the acquisition of capital assets with the goal of delivering projects on schedule, within budget, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health standards. Cancels DOE O 413.3. Canceled by DOE O 413.3A Chg 1.

  9. Decontamination of Anthrax spores in critical infrastructure and critical assets.

    SciTech Connect (OSTI)

    Boucher, Raymond M.; Crown, Kevin K.; Tucker, Mark David; Hankins, Matthew Granholm

    2010-05-01

    Decontamination of anthrax spores in critical infrastructure (e.g., subway systems, major airports) and critical assets (e.g., the interior of aircraft) can be challenging because effective decontaminants can damage materials. Current decontamination methods require the use of highly toxic and/or highly corrosive chemical solutions because bacterial spores are very difficult to kill. Bacterial spores such as Bacillus anthracis, the infectious agent of anthrax, are one of the most resistant forms of life and are several orders of magnitude more difficult to kill than their associated vegetative cells. Remediation of facilities and other spaces (e.g., subways, airports, and the interior of aircraft) contaminated with anthrax spores currently requires highly toxic and corrosive chemicals such as chlorine dioxide gas, vapor- phase hydrogen peroxide, or high-strength bleach, typically requiring complex deployment methods. We have developed a non-toxic, non-corrosive decontamination method to kill highly resistant bacterial spores in critical infrastructure and critical assets. A chemical solution that triggers the germination process in bacterial spores and causes those spores to rapidly and completely change to much less-resistant vegetative cells that can be easily killed. Vegetative cells are then exposed to mild chemicals (e.g., low concentrations of hydrogen peroxide, quaternary ammonium compounds, alcohols, aldehydes, etc.) or natural elements (e.g., heat, humidity, ultraviolet light, etc.) for complete and rapid kill. Our process employs a novel germination solution consisting of low-cost, non-toxic and non-corrosive chemicals. We are testing both direct surface application and aerosol delivery of the solutions. A key Homeland Security need is to develop the capability to rapidly recover from an attack utilizing biological warfare agents. This project will provide the capability to rapidly and safely decontaminate critical facilities and assets to return them to

  10. SCB initiator

    DOE Patents [OSTI]

    Bickes, Jr., Robert W. (Albuquerque, NM); Renlund, Anita M. (Albuquerque, NM); Stanton, Philip L. (Albuquerque, NM)

    1994-01-01

    A detonator for high explosives initiated by mechanical impact includes a cylindrical barrel, a layer of flyer material mechanically covering the barrel at one end, and a semiconductor bridge ignitor including a pair of electrically conductive pads connected by a semiconductor bridge. The bridge is in operational contact with the layer, whereby ignition of said bridge forces a portion of the layer through the barrel to detonate the explosive. Input means are provided for igniting the semiconductor bridge ignitor.

  11. SCB initiator

    DOE Patents [OSTI]

    Bickes Jr., Robert W.; Renlund, Anita M.; Stanton, Philip L.

    1994-11-01

    A detonator for high explosives initiated by mechanical impact includes a cylindrical barrel, a layer of flyer material mechanically covering the barrel at one end, and a semiconductor bridge ignitor including a pair of electrically conductive pads connected by a semiconductor bridge. The bridge is in operational contact with the layer, whereby ignition of said bridge forces a portion of the layer through the barrel to detonate the explosive. Input means are provided for igniting the semiconductor bridge ignitor.

  12. Web-based Electronic Sharing and RE-allocation of Assets

    Energy Science and Technology Software Center (OSTI)

    2002-09-09

    The Electronic Asses Sharing Program is a web-based application that provides the capability for complex-wide sharing and reallocation of assets that are excess, under utilized, or un-utilized. through a web-based fron-end and supporting has database with a search engine, users can search for assets that they need, search for assets needed by others, enter assets they need, and enter assets they have available for reallocation. In addition, entire listings of available assets and needed assetsmore » can be viewed. The application is written in Java, the hash database and search engine are in Object-oriented Java Database Management (OJDBM). The application will be hosted on an SRS-managed server outside the Firewall and access will be controlled via a protected realm. An example of the application can be viewed at the followinig (temporary) URL: http://idgdev.srs.gov/servlet/srs.weshare.WeShare« less

  13. The Department's real property assets are vital to the accomplishment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its mission | Department of Energy The Department’s real property assets are vital to the accomplishment of its mission The Department’s real property assets are vital to the accomplishment of its mission The Department’s real property assets are vital to the accomplishment of its mission (144.65 KB) More Documents & Publications Three Year Rolling Timeline Three-year Rolling Timeline FY2012 Three Year Rolling Timeline

  14. About the Asset Management Team (LM-20.3) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Asset Management Team (LM-20.3) About the Asset Management Team (LM-20.3) The Asset Management Team (AMT) is based in Westminster, Colorado. The AMT provides cross-cutting support to other LM programs in the areas of facilities management and security, personal property and real property management, and fleet. The AMT also manages LM's joint federal/contractor Environmental Management System (EMS) program that addresses both environmental compliance and sustainability. Lastly, the AMT manages LM

  15. U.S. Department of Energy Project Review Guide for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, U.S. Department of Energy Project Review Guide for Capital Asset Projects by John Makepeace Functional areas: Program Management, Project Management This Guide addresses the...

  16. DOE Building Energy Asset Score: Energy Efficiency Services Companies Webinar (Text Version)

    Broader source: Energy.gov [DOE]

    Below is the text version of the webinar DOE Building Energy Asset Score: Energy Efficiency Services Companies, presented in March 2015.

  17. Microsoft Word - (Revised) Final Land Asset Transfer for Beneficial Reuse Report 6 9 15.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    i TABLE OF CONTENTS Section 1. Executive Summary ..................................................................................................................... 1 Section 2. Introduction and History of DOE Land Disposals ........................................................................ 2 Authorization ............................................................................................................................................ 3 Asset Reuse History and Community Reuse

  18. Oak Ridge National Laboratory Next Generation Safeguards Initiative

    SciTech Connect (OSTI)

    Kirk, Bernadette Lugue; Eipeldauer, Mary D; Whitaker, J Michael

    2011-12-01

    In 2007, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) Office of Nonproliferation and International Security (NA-24) completed a comprehensive review of the current and potential future challenges facing the international safeguards system. The review examined trends and events impacting the mission of international safeguards and the implications of expanding and evolving mission requirements on the legal authorities and institutions that serve as the foundation of the international safeguards system, as well as the technological, financial, and human resources required for effective safeguards implementation. The review's findings and recommendations were summarized in the report, 'International Safeguards: Challenges and Opportunities for the 21st Century (October 2007)'. One of the report's key recommendations was for DOE/NNSA to launch a major new program to revitalize the international safeguards technology and human resource base. In 2007, at the International Atomic Energy Agency's General Conference, then Secretary of Energy Samuel W. Bodman announced the newly created Next Generation Safeguards Initiative (NGSI). NGSI consists of five program elements: (1) Policy development and outreach; (2) Concepts and approaches; (3) Technology and analytical methodologies; (4) Human resource development; and (5) Infrastructure development. The ensuing report addresses the 'Human Resource Development (HRD)' component of NGSI. The goal of the HRD as defined in the NNSA Program Plan (November 2008) is 'to revitalize and expand the international safeguards human capital base by attracting and training a new generation of talent.' One of the major objectives listed in the HRD goal includes education and training, outreach to universities, professional societies, postdoctoral appointments, and summer internships at national laboratories. ORNL is a participant in the NGSI program, together with several DOE laboratories such as Pacific

  19. SAVANNAH RIVER REGIONAL DIVERSIFICATION INITIATIVE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRS COMMUNITY REUSE ORGANIZATION ASSET TRANSITION DUE DILIGENCE WORKSHEET LOCAL BUSINESS DEVELOPMENT Legal Name: Contact Person: Email: Address: City: State: Zip...

  20. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Supersedes DOE O 413.3B Chg 1 (AdminChg)

  1. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool.

  2. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

  3. Program and Project Management for the Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-13

    To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

  4. CO{sub 2} Allowance Allocation in the Regional Greenhouse Gas Initiative and the Effect on Electricity Investors

    SciTech Connect (OSTI)

    Burtraw, Dallas; Kahn, Danny; Palmer, Karen

    2006-03-01

    The Regional Greenhouse Gas Initiative among Northeastern states is expected to lead to an increase in the price of electricity in the region and beyond. In the RGGI region, changes in the value of electricity-generating assets may be positive or negative, while changes outside the Northeast are virtually always positive. For stakeholders in the industry, the change depends on the portfolio of assets held by affected firms. (author)

  5. USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?

    SciTech Connect (OSTI)

    Magoulas, V.

    2013-06-03

    The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national

  6. Microdrill Initiative - Initial Market Evaluation

    SciTech Connect (OSTI)

    Spears & Associates, Inc

    2003-07-01

    The U.S. Department of Energy (DOE) is launching a major research and development initiative to create a small, fast, inexpensive and environmentally friendly rig for drilling 5000 feet boreholes to investigate potential oil and gas reservoirs. DOE wishes to get input from petroleum industry operators, service companies and equipment suppliers on the operation and application of this coiled-tubing-based drilling unit. To that end, DOE has asked Spears & Associates, Inc. (SAI) to prepare a special state-of-the-market report and assist during a DOE-sponsored project-scoping workshop in Albuquerque near the end of April 2003. The scope of the project is four-fold: (1) Evaluate the history, status and future of demand for very small bore-hole drilling; (2) Measure the market for coiled tubing drilling and describe the state-of-the-art; (3) Identify companies and individuals who should have an interest in micro drilling and invite them to the DOE workshop; and (4) Participate in 3 concurrent workshop sessions, record and evaluate participant comments and report workshop conclusions.

  7. Oak Ridge ARI Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset revitalization initiative in Oak Ridge, TN. Oakridge_Fact_Sheet.pdf (382.48 KB) More Documents & Publications ARI Quarterly Newsletter Oak Ridge ARI Overview ARI: Creating a 2020 DOE Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets

  8. DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conference | Department of Energy NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference More than 150 energy sector leaders-including nearly 100 asset owners and operators-gathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the Department of Energy's National SCADA Test Bed (NSTB) Program gave a four-hour demonstration and

  9. DOE NSTB Researchers Demonstrate R&D Successes to Asset Owners at EnergySec Conference

    Broader source: Energy.gov [DOE]

    More than 150 energy sector leaders—including nearly 100 asset owners and operators—gathered at the 2009 EnergySec Annual Summit in Seattle, WA, on Sept. 23-24, where researchers from the...

  10. Notice of Intent to Revise DOE O 430.1B, Real Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-02-04

    The proposed revision would update the existing order to enact the Asset Management Plan, institutionalize the recommendations of the Laboratory Operations Board (LOB) working groups on infrastructure, and incorporate government-wide real property policies and practives mandated since 2003.

  11. Nashville Turns an Eyesore into an Energy-Efficient Asset | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Nashville Turns an Eyesore into an Energy-Efficient Asset Nashville Turns an Eyesore into an Energy-Efficient Asset September 19, 2012 - 10:43am Addthis The completed Nashville Bridge Company's building (called NABRICO for short) includes a geothermal heat pump system to keep public energy costs low. | Photo courtesy of David Powell, AIA. The completed Nashville Bridge Company's building (called NABRICO for short) includes a geothermal heat pump system to keep public energy costs low.

  12. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  13. Development of Asset Fault Signatures for Prognostic and Health Management in the Nuclear Industry

    SciTech Connect (OSTI)

    Vivek Agarwal; Nancy J. Lybeck; Randall Bickford; Richard Rusaw

    2014-06-01

    Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: Diagnostic Advisor, Asset Fault Signature (AFS) Database, Remaining Useful Life Advisor, and Remaining Useful Life Database. This paper focuses on development of asset fault signatures to assess the health status of generator step-up generators and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive features based on technical examinations that can be used to detect a specific fault type. At the most basic level, fault signatures are comprised of an asset type, a fault type, and a set of one or more fault features (symptoms) that are indicative of the specified fault. The AFS Database is populated with asset fault signatures via a content development exercise that is based on the results of intensive technical research and on the knowledge and experience of technical experts. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

  14. Distributed Smart Grid Asset Control Strategies for Providing Ancillary Services

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Zhang, Wei; Lian, Jianming; Marinovici, Laurentiu D.; Moya, Christian; Dagle, Jeffery E.

    2013-10-30

    With large-scale plans to integrate renewable generation driven mainly by state-level renewable portfolio requirements, more resources will be needed to compensate for the uncertainty and variability associated with intermittent generation resources. Distributed assets can be used to mitigate the concerns associated with renewable energy resources and to keep costs down. Under such conditions, performing primary frequency control using only supply-side resources becomes not only prohibitively expensive but also technically difficult. It is therefore important to explore how a sufficient proportion of the loads could assume a routine role in primary frequency control to maintain the stability of the system at an acceptable cost. The main objective of this project is to develop a novel hierarchical distributed framework for frequency based load control. The framework involves two decision layers. The top decision layer determines the optimal gain for aggregated loads for each load bus. The gains are computed using decentralized robust control methods, and will be broadcast to the corresponding participating loads every control period. The second layer consists of a large number of heterogeneous devices, which switch probabilistically during contingencies so that aggregated power change matches the desired amount according to the most recently received gains. The simulation results show great potential to enable systematic design of demand-side primary frequency control with stability guarantees on the overall power system. The proposed design systematically accounts for the interactions between the total load response and bulk power system frequency dynamics. It also guarantees frequency stability under a wide range of time varying operating conditions. The local device-level load response rules fully respect the device constraints (such as temperature setpoint, compressor time delays of HVACs, or arrival and departure of the deferrable loads), which are crucial for

  15. Next Generation Safeguards Initiative Efforts at Los Alamos National Laboratory: Developing Our Human Capital FY2015

    SciTech Connect (OSTI)

    Stevens, Rebecca S.; Hawkins Erpenbeck, Heather

    2015-10-13

    This report documents the accomplishments of the Safeguards HCD Fiscal Year 2015 (FY15) Project Work Plan, highlighting LANL’s work as well as the accomplishments of our NGSI-sponsored students, graduate and postdoctoral fellows, and mid-career professionals during this past year. While fiscal year 2015 has been a year of transition in the Human Capital Development area for LANL, we are working to revitalize our efforts to promote and develop Human Capital in Safeguards and Non-proliferation and are looking forward to implementing new initiatives in the coming fiscal year and continuing to transition the knowledge of staff who have been on assignment at IAEA and Headquarters to improve our support to HCD.

  16. Commercial Building Energy Asset Score System: Program Overview and Technical Protocol (Version 1.0)

    SciTech Connect (OSTI)

    Wang, Na; Gorrissen, Willy J.

    2013-01-11

    The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system that includes an energy asset score tool to help building owners evaluate their buildings with respect to the score system. The goal of the energy asset score system is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system will allow building owners and managers to compare their building infrastructure against peers and track building upgrade progress over time. The system can also help other building stakeholders (e.g., building operators, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from their operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset score tool. This report also describes alternative methods that were considered prior to developing the current approach. Finally, this report describes a few features of the program where alternative approaches are still under evaluation.

  17. Transactive Control and Coordination of Distributed Assets for Ancillary Services

    SciTech Connect (OSTI)

    Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

    2013-09-18

    The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variabilityforecasted as well as unforecastedshould be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: Participation should be entirely voluntary. The participant decides at what price s/he is willing to participate. The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: spinning reserve ramping regulation. These services are to be provided by the following devices: refrigerators water heaters clothes dryers variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal) introduce delays that can be

  18. DOE Commercial Building Energy Asset Rating: Market Research and Program Direction

    SciTech Connect (OSTI)

    Wang, Na; Taylor, Cody; McCabe, Molly J.

    2012-08-12

    This paper presents the development of a voluntary energy asset rating system, to evaluate the physical characteristics and as-built energy efficiency of new and existing commercial buildings. The energy asset rating system is intended to enable commercial building stakeholders to directly compare expected as-built energy performance among similar buildings and to analyze the potential for capital improvements to increase energy efficiency cost-effectively. Market research has been performed to understand the market demand and how to communicate energy and cost savings to owners, investors, financiers, and others to overcome market barriers and motivate capital investment in building energy efficiency. The paper discusses the findings of the market research. Building owners are concerned about redundancy, conflicting requirements, and cost. They also pointed out a data gap and desire a rating program that identifies improvement opportunities. A meaningful linkage between the energy asset rating and other rating systems is essential. Based on the findings, criteria for a successful energy asset rating program have been developed to direct the program design, including validity of ratings, actionable, cost effective recommendations, effective quality control, integration with other rating systems, and necessary training and education. In addition to the rating system, an asset rating tool is being developed to reduce cost and increase standardization, allowing for consistent and reliable comparisons among and between buildings. The asset rating tool is the first step in the process by which owners can enter information about their building structure and receive information on the buildings modeled performance and recommended efficiency measures.

  19. The President's Manufacturing Initiative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The President's Manufacturing Initiative Manufacturing Initiative Roadmap Workshop on Roadmap Workshop on Manufacturing R&D for Manufacturing R&D for the Hydrogen Economy the ...

  20. Microsoft PowerPoint - Gilbertson - Energy Park Initiative Update

    Office of Environmental Management (EM)

    Initiative "Leveraging Assets to increase the Taxpayer's Return on Investment" September 30, 2009 September 30, 2009 Mark A. Gilbertson Deputy Assistant Secretary for Engineering & Technology 2 Energy, Environment & the Economy "So we have a choice to make. We can remain one of the world's leading importers of foreign oil, or we can make the investments that would allow us to become the world's leading exporter of renewable energy. We can let climate change continue to go

  1. WCI - World Consensus Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    World Consensus Initiative 2005 Workshop Recap WCI 2004 Website WCI Book Contributed Papers

  2. Prognostic and health management of active assets in nuclear power plants

    SciTech Connect (OSTI)

    Agarwal, Vivek; Lybeck, Nancy; Pham, Binh T.; Rusaw, Richard; Bickford, Randall

    2015-06-04

    This study presents the development of diagnostic and prognostic capabilities for active assets in nuclear power plants (NPPs). The research was performed under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability Program. Idaho National Laboratory researched, developed, implemented, and demonstrated diagnostic and prognostic models for generator step-up transformers (GSUs). The Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software developed by the Electric Power Research Institute was used to perform diagnosis and prognosis. As part of the research activity, Idaho National Laboratory implemented 22 GSU diagnostic models in the Asset Fault Signature Database and two wellestablished GSU prognostic models for the paper winding insulation in the Remaining Useful Life Database of the FW-PHM Suite. The implemented models along with a simulated fault data stream were used to evaluate the diagnostic and prognostic capabilities of the FW-PHM Suite. Knowledge of the operating condition of plant asset gained from diagnosis and prognosis is critical for the safe, productive, and economical long-term operation of the current fleet of NPPs. This research addresses some of the gaps in the current state of technology development and enables effective application of diagnostics and prognostics to nuclear plant assets.

  3. The Department's real property assets are vital to the accomplishment of its mission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    i Department of Energy Three Year Rolling Timeline; Implementing the Goals and Objectives of Asset Management Plan Prepared by: Office of Engineering and Construction Management Fiscal Year 2012 Update ii TABLE OF CONTENTS: SECTION 1: Three Year Rolling Time Line Overview....................................1 Introduction.....................................................................................1 Summary of Accomplishments..........................................................1

  4. Prognostic and health management of active assets in nuclear power plants

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Agarwal, Vivek; Lybeck, Nancy; Pham, Binh T.; Rusaw, Richard; Bickford, Randall

    2015-06-04

    This study presents the development of diagnostic and prognostic capabilities for active assets in nuclear power plants (NPPs). The research was performed under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability Program. Idaho National Laboratory researched, developed, implemented, and demonstrated diagnostic and prognostic models for generator step-up transformers (GSUs). The Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software developed by the Electric Power Research Institute was used to perform diagnosis and prognosis. As part of the research activity, Idaho National Laboratory implemented 22 GSU diagnostic models in the Asset Fault Signature Database and twomore » wellestablished GSU prognostic models for the paper winding insulation in the Remaining Useful Life Database of the FW-PHM Suite. The implemented models along with a simulated fault data stream were used to evaluate the diagnostic and prognostic capabilities of the FW-PHM Suite. Knowledge of the operating condition of plant asset gained from diagnosis and prognosis is critical for the safe, productive, and economical long-term operation of the current fleet of NPPs. This research addresses some of the gaps in the current state of technology development and enables effective application of diagnostics and prognostics to nuclear plant assets.« less

  5. The Departments real property assets are vital to the accomplishment of its mission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    i Department of Energy Three Year Rolling Timeline; Implementing the Goals and Objectives of DOE's Asset Management Plan Prepared by: Office of Acquisition and Project Management Fiscal Year 2013 Update March 2013 ii TABLE OF CONTENTS: SECTION 1: Three Year Rolling Time Line Overview....................................1 Introduction.....................................................................................1 Summary of

  6. Smart Buildings Equipment Initiative | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    increased interest in new strategies for engaging building energy assets to provide peak load management, regulation services, and ancillary services to the grid. Such engagement...

  7. Keck Futures Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Academies Keck Futures Initiative Complex Systems Conference, November 12 - 15, 2008 Challa Kumar(second from left) was invited to attend 1st National Academies Keck Futures Initiative Complex Systems Conference

  8. Ohio Fuel Cell Initiative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Top 5 Fuel Cell States: Why Local Policies Mean Green Growth Jun 21 st , 2011 2 * Ohio Fuel Cell Initiative * Ohio Fuel Cell Coalition * Accomplishments * Ohio Successes Discussion Areas 3 Ohio's Fuel Cell Initiative * Announced on 5/9/02 * Part of Ohio Third Frontier Initiative * $85 million investment to date * Core focus areas: 1) Expand the state's research capabilities; 2) Participate in demonstration projects; and 3) Expand the fuel cell industry in Ohio 4 OHIO'S FUEL CELL INITIATIVE

  9. DOE TEAM Initiative

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presented by: Geoffrey C. Bell, PE Geoffrey C. Bell, PE High Tech Buildings High Tech Buildings ~ ~ Berkeley Fume Hood Berkeley Fume Hood ~ ~ Aerosol Duct Sealing Aerosol Duct Sealing DOE TEAM Initiative DOE TEAM Initiative Facilities and Environmental Energy Technologies Facilities and Environmental Energy Technologies 1 Facilities and Environmental Energy Technologies Facilities and Environmental Energy Technologies 2 DOE TEAM Initiative DOE TEAM Initiative High Tech Buildings High Tech

  10. Wind Integration Initiatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expand Projects & Initiatives Finance & Rates Expand Finance & Rates Involvement & Outreach Expand Involvement & Outreach Doing Business Expand Doing Business...

  11. APEC Smart Grid Initiative

    SciTech Connect (OSTI)

    Bloyd, Cary N.

    2012-03-01

    This brief paper describes the activities of the Asia Pacific Economic Cooperation (APEC) Smart Grid Initiative (ASGI) which is being led by the U.S. and developed by the APEC Energy Working Group. In the paper, I describe the origin of the initiative and briefly mention the four major elements of the initiative along with existing APEC projects which support it.

  12. Understanding Building Infrastructure and Building Operation through DOE Asset Score Model: Lessons Learned from a Pilot Project

    SciTech Connect (OSTI)

    Wang, Na; Goel, Supriya; Gorrissen, Willy J.; Makhmalbaf, Atefe

    2013-06-24

    The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system to help building owners to evaluate the as-built physical characteristics (including building envelope, the mechanical and electrical systems) and overall building energy efficiency, independent of occupancy and operational choices. The energy asset score breaks down building energy use information by simulating building performance under typical operating and occupancy conditions for a given use type. A web-based modeling tool, the energy asset score tool facilitates the implementation of the asset score system. The tool consists of a simplified user interface built on a centralized simulation engine (EnergyPlus). It is intended to reduce both the implementation cost for the users and increase modeling standardization compared with an approach that requires users to build their own energy models. A pilot project with forty-two buildings (consisting mostly offices and schools) was conducted in 2012. This paper reports the findings. Participants were asked to collect a minimum set of building data and enter it into the asset score tool. Participants also provided their utility bills, existing ENERGY STAR scores, and previous energy audit/modeling results if available. The results from the asset score tool were compared with the building energy use data provided by the pilot participants. Three comparisons were performed. First, the actual building energy use, either from the utility bills or via ENERGY STAR Portfolio Manager, was compared with the modeled energy use. It was intended to examine how well the energy asset score represents a buildings system efficiencies, and how well it is correlated to a buildings actual energy consumption. Second, calibrated building energy models (where they exist) were used to examine any discrepancies between the asset score model and the pilot participant buildings [known] energy use pattern. This comparison examined the end use

  13. Federal Response Assets for a Radioactive Dispersal Device Incident

    SciTech Connect (OSTI)

    Sullivan,T.

    2009-06-30

    If a large scale RDD event where to occur in New York City, the magnitude of the problem would likely exceed the capabilities of City and State to effectively respond to the event. New York State could request Federal Assistance if the United States President has not already made the decision to provide it. The United States Federal Government has a well developed protocol to respond to emergencies. The National Response Framework (NRF) describes the process for responding to all types of emergencies including RDD incidents. Depending on the location and type of event, the NRF involves appropriate Federal Agencies, e.g., Department of Homeland Security (DHS), the Department of Energy (DOE), Environmental Protection Agency (EPA), United States Coast Guard (USCG), Department of Defense (DOD), Department of Justice (DOJ), Department of Agriculture (USDA), and Nuclear Regulatory Commission (NRC). The Federal response to emergencies has been refined and improved over the last thirty years and has been tested on natural disasters (e.g. hurricanes and floods), man-made disasters (oil spills), and terrorist events (9/11). However, the system has never been tested under an actual RDD event. Drills have been conducted with Federal, State, and local agencies to examine the initial (early) phases of such an event (TopOff 2 and TopOff 4). The Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) incidents issued by the Department of Homeland Security (DHS) in August 2008 has never been fully tested in an interagency exercise. Recently, another exercise called Empire 09 that was situated in Albany, New York was conducted. Empire 09 consists of 3 different exercises be held in May and June, 2009. The first exercise, May 2009, involved a table top exercise for phase 1 (0-48 hours) of the response to an RDD incident. In early June, a full-scale 3- day exercise was conducted for the mid-phase response (48

  14. Chemical Industry Corrosion Management: A Comprehensive Information System (ASSET 2). Final Report

    SciTech Connect (OSTI)

    John, Randy C.; Young, Arthur L.; Pelton, Arthur D.; Thompson, William T.; Wright, Ian G.

    2008-10-10

    The research sponsored by this project has greatly expanded the ASSET corrosion prediction software system to produce a world-class technology to assess and predict engineering corrosion of metals and alloys corroding by exposure to hot gases. The effort included corrosion data compilation from numerous industrial sources and data generation at Shell Oak Ridge National Laboratory and several other companies for selected conditions. These data were organized into groupings representing various combinations of commercially available alloys and corrosion by various mechanisms after acceptance via a critical screening process to ensure the data were for alloys and conditions, which were adequately well defined, and of sufficient repeatability. ASSET is the largest and most capable, publicly-available technology in the field of corrosion assessment and prediction for alloys corroding by high temperature processes in chemical plants, hydrogen production, energy conversion processes, petroleum refining, power generation, fuels production and pulp/paper processes. The problems addressed by ASSET are: determination of the likely dominant corrosion mechanism based upon information available to the chemical engineers designing and/or operating various processes and prediction of engineering metal losses and lifetimes of commercial alloys used to build structural components. These assessments consider exposure conditions (metal temperatures, gas compositions and pressures), alloy compositions and exposure times. Results of the assessments are determination of the likely dominant corrosion mechanism and prediction of the loss of metal/alloy thickness as a function of time, temperature, gas composition and gas pressure. The uses of these corrosion mechanism assessments and metal loss predictions are that the degradation of processing equipment can be managed for the first time in a way which supports efforts to reduce energy consumption, ensure structural integrity of equipment

  15. EMAB Briefing on Capital Assets Projects and Operations Activities Presentation by Mark Gilbertson

    Office of Environmental Management (EM)

    Capital Asset Projects and Operations Activities www.em.doe.gov 1 Presented to Environmental Management Advisory Boards Mark Gilbertson Deputy Assistant Secretary for Site Restoration Office of Environmental Management May 31, 2012 We reduce risks and protect our workers, our communities and the environment through cleanup Our work is urgent and essential to the health and economic vitality of our communities and the nation and positions our Sites for future missions and use Our mission is not

  16. Microsoft Word - Optimizes Assets Operates Efficiently_APPROVED_2009_09_09.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OPTIMIZES ASSET UTILIZATION AND OPERATES EFFICIENTLY Developed for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability by the National Energy Technology Laboratory September 2009 Office of Electricity Delivery and Energy Reliability v 3.0 Accommodates All Generation and Storage Options 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor

  17. Asset valuation: the multibillion-dollar controversy in the AT and T case

    SciTech Connect (OSTI)

    Hensler, D.J.; Smith, W.A. Jr.

    1982-05-27

    This article identifies issues raised by the January 1982, proposed settlement of an antitrust suit between the US Department of Justice and the American Telephone and Telegraph Company regarding the valuation of assets that change hands pursuant to that settlement. It suggests ways in which those issues might be resolved and analyzes how their resolution may directly affect the local operating telephone companies, their creditors, and telephone service users.

  18. Implications of changing correlations between WTI and other commodities, asset classes, and implied volatility

    U.S. Energy Information Administration (EIA) Indexed Site

    Implications of changing correlations between WTI and other commodities, asset classes, and implied volatility James Preciado October 2012 Independent Statistics & Analysis www.eia.gov U.S. Energy Information Administration Washington, DC 20585 This paper is released to encourage discussion and critical comment. The analysis and conclusions expressed here are those of the authors and not necessarily those of the U.S. Energy Information Administration. WORKING PAPER SERIES October 2012 James

  19. Chapter II: Increasing the Resilience, Reliability, Safety, and Asset Security of TS&D Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -52 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 Chapter II: Increasing the Resilience, Reliability, Safety, and Asset Security of TS&D Infrastructure QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 3-1 Chapter III This chapter examines how the electricity grid of the future can provide affordable and reliable clean electricity, while minimizing further human contributions to climate change. After an

  20. Progress in Initiator Modeling

    SciTech Connect (OSTI)

    Hrousis, C A; Christensen, J S

    2009-05-04

    There is great interest in applying magnetohydrodynamic (MHD) simulation techniques to the designs of electrical high explosive (HE) initiators, for the purpose of better understanding a design's sensitivities, optimizing its performance, and/or predicting its useful lifetime. Two MHD-capable LLNL codes, CALE and ALE3D, are being used to simulate the process of ohmic heating, vaporization, and plasma formation in the bridge of an initiator, be it an exploding bridgewire (EBW), exploding bridgefoil (EBF) or slapper type initiator. The initiation of the HE is simulated using Tarver Ignition & Growth reactive flow models. 1-D, 2-D and 3-D models have been constructed and studied. The models provide some intuitive explanation of the initiation process and are useful for evaluating the potential impact of identified aging mechanisms (such as the growth of intermetallic compounds or powder sintering). The end product of this work is a simulation capability for evaluating margin in proposed, modified or aged initiation system designs.

  1. Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)

    SciTech Connect (OSTI)

    Wang, Na; Goel, Supriya; Makhmalbaf, Atefe

    2013-08-09

    The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.

  2. Initiatives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives Initiatives Through a variety of cross-cutting program initiatives, the Office of International Affairs (IA) responds to the most pressing global energy challenges, ranging from energy security and market volatility to long-term efforts to reduce carbon pollution and the impacts of climate change. IA has the primary responsibility for coordinating the efforts of diverse elements in the Department to ensure a unified voice in our international energy policy. This page highlights some

  3. National Laboratory Impact Initiative

    Broader source: Energy.gov [DOE]

    The National Laboratory Impact Initiative supports the relationship between the Office of Energy Efficiency & Renewable Energy and the national laboratory enterprise.  The national laboratories...

  4. About the Initiative

    SciTech Connect (OSTI)

    Not Available

    2007-06-01

    This factsheet gives an overview of the Solar America Initiative (SAI), including goals, research and development strategy, market transformation strategy, and benefits to nation.

  5. TVA- Solar Solutions Initiative

    Broader source: Energy.gov [DOE]

    Solar Solutions Initiative (SSI) is a pilot program that offers additional financial incentives for Solar PV systems participating in the Renewable Standard Offer program. Applications for new...

  6. Salt Waste Processing Initiatives

    Office of Environmental Management (EM)

    Patricia Suggs Salt Processing Team Lead Assistant Manager for Waste Disposition Project Office of Environmental Management Savannah River Site Salt Waste Processing Initiatives 2 ...

  7. National Nanotechnology Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Nanotechnology Initiative (NNI) Basic Energy Sciences (BES) BES Home About Research Materials Sciences & Engineering (MSE) Chemical Sciences, Geosciences, and Biosciences (CSGB) Accelerator and Detector Research Research Conduct Policies DOE Energy Innovation Hubs Energy Frontier Research Centers National Nanotechnology Initiative (NNI) Nanomaterials ES&H Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC)

  8. Initiatives | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATLAS Support Center Center for Computational Excellence Coordinating Panel for Advanced Detectors Publications News & Events Upcoming Events Press Releases Feature Stories In the News Videos Downloads About HEP at Work Career Opportunities Staff Directory About HEP at Work Career Opportunities Staff Directory Argonne National Laboratory High Energy Physics Research Facilities Capabilities Initiatives Publications News & Events Initiatives ATLAS Support Center Center for Computational

  9. Microsoft Word - EM SSAB Chairs Meeting Oct 2012 Minutes_2_14_13_rFINAL _2_

    Office of Environmental Management (EM)

    Washington, D.C. 20585 October 2 - 3, 2012 2 Environmental Management Site-Specific Advisory Board - October 2-3, 2012 Meeting Minutes LIST OF ACRONYMS ARI - Asset Revitalization Initiative ARRA - American Recovery and Reinvestment Act CAB - Citizens Advisory Board CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act CH-TRU - Contact-handled Transuranic Waste CR - Continuing Resolution D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal

  10. Mathematical Analysis of High-Temperature Co-electrolysis of CO2 and O2 Production in a Closed-Loop Atmosphere Revitalization System

    SciTech Connect (OSTI)

    Michael G. McKellar; Manohar S. Sohal; Lila Mulloth; Bernadette Luna; Morgan B. Abney

    2010-03-01

    NASA has been evaluating two closed-loop atmosphere revitalization architectures based on Sabatier and Bosch carbon dioxide, CO2, reduction technologies. The CO2 and steam, H2O, co-electrolysis process is another option that NASA has investigated. Utilizing recent advances in the fuel cell technology sector, the Idaho National Laboratory, INL, has developed a CO2 and H2O co-electrolysis process to produce oxygen and syngas (carbon monoxide, CO and hydrogen, H2 mixture) for terrestrial (energy production) application. The technology is a combined process that involves steam electrolysis, CO2 electrolysis, and the reverse water gas shift (RWGS) reaction. A number of process models have been developed and analyzed to determine the theoretical power required to recover oxygen, O2, in each case. These models include the current Sabatier and Bosch technologies and combinations of those processes with high-temperature co-electrolysis. The cases of constant CO2 supply and constant O2 production were evaluated. In addition, a process model of the hydrogenation process with co-electrolysis was developed and compared. Sabatier processes require the least amount of energy input per kg of oxygen produced. If co-electrolysis replaces solid polymer electrolyte (SPE) electrolysis within the Sabatier architecture, the power requirement is reduced by over 10%, but only if heat recuperation is used. Sabatier processes, however, require external water to achieve the lower power results. Under conditions of constant incoming carbon dioxide flow, the Sabatier architectures require more power than the other architectures. The Bosch, Boudouard with co-electrolysis, and the hydrogenation with co-electrolysis processes require little or no external water. The Bosch and hydrogenation processes produce water within their reactors, which aids in reducing the power requirement for electrolysis. The Boudouard with co-electrolysis process has a higher electrolysis power requirement because carbon