Plant Wide Assessment for SIFCO Industries, Inc.  

Science Conference Proceedings (OSTI)

Sifco Industries carreid out a plant wide energy assessment under a collaborative program with the U.S. Department of Energy during October 2004 to September 2005. During the year, personnel from EIS, E3M, DPS, BuyCastings.Com, and Sifco plant facilities and maintenance personnel, as a team collected energy use, construction, process, equipment and operational information about the plant. Based on this information, the team identified 13 energy savings opportunities. Near term savings opportunities have a total potential savings of about $1,329,000 per year and a combined simple payback of about 11 months. Implementation of these recommendations would reduce CO2 emissions by about 16,000,000 pounds per year, which would reduce overall plant CO2 emissions by about 45%. These totals do not include another $830,000 per year in potential savings with an estimated 9-month payback, from converting the forging hammers from steam to compressed air.

Kelly Kissock, Arvind Thekdi et. al.

2005-07-06T23:59:59.000Z

2

Martinez Refinery Completes Plant-Wide Energy Assessment  

SciTech Connect

This OIT BestPractices Case Study describes how the Equilon Enterprises oil refinery in Martinez, California undertook a plant-wide energy assessment that focused on three key areas: waste minimization, process debottlenecking, and operations optimization. The assessment yielded recommendations, which, if implemented, can save more than 6,000,000 MMBtu per year and an estimated $52,000,000 per year, plus improve process control and reduce waste.

Not Available

2002-11-01T23:59:59.000Z

3

A comprehensive plant-wide assessment of Amcor PET Packaging at Fairfield, California  

SciTech Connect

This report includes the results of the plant-wide assessment of AMCOR PET plants in Fairfield, City of Commerce, and Lathrop California. The project (except the assessment of Lathrop plant) was a cost shared effort between US Department of Energy through Golden Field Office, Golden CO and AMCOR PET Packaging Co. The DOE share of the plant-wide assessment cost was awarded to AMCOR PET in response to the RFP DE-PS36-05GO95009, the 2005 round of funding for “Plant-Wide Energy Efficiency Opportunity Assessments.” The plant-wide assessment included the processes, electrical and gas equipment. Current production practices have been evaluated against best practice standards, as well as utilization of modern technology to improve energy efficiency, reduce the wastes, and improve productivity.

Kevin Losh; Hui Choi; Yin Yin Wu; Bryan W. Hackett; Ahmad R. Ganji

2008-02-29T23:59:59.000Z

4

Plant-Wide Assessment Report for Shaw Industries, Plant #78; Aiken, SC  

Science Conference Proceedings (OSTI)

A plant-wide energy assessment sponsored by the U.S. Department of Energy was conducted at Shaw Industries Group, plant #78 in Aiken, SC. The assessment team consisted of Georgia Tech faculty from the Energy & Environmental Management Center and Shaw personnel from plant #78 and the corporate energy group. The purpose of this assessment was to uncover as many opportunities for saving energy usage and costs using techniques that have been established as best practices in the energy engineering field. In addition, these findings are to be shared with similar plants in Shaw Industries Group to multiply the lessons learned. The findings from this assessment are included in this report.

Michael Brown PE, CEM; Matt Soderlund; Bill Meffert PE; Paolo Baldisserotto; Jerry Zolkowski PE, CEM

2006-04-10T23:59:59.000Z

5

DOE PLANT-WIDE ENERGY ASSESSMENT RESULTS RELATED TO THE U. S. AUTOMOTIVE INDUSTRY  

SciTech Connect

Forty-nine plant-wide energy efficiency assessments have been undertaken under sponsorship of the U.S. Department of Industrial Technologies Program. Plant-wide assessments are comprehensive, systematic investigations of plant energy efficiency, including plant utility systems and process operations. Assessments in industrial facilities have highlighted opportunities for implementing best practices in industrial energy management, including the adoption of new, energy-efficient technologies and process and equipment improvements. Total annual savings opportunities of $201 million have been identified from the 40 completed assessments. Many of the participating industrial plants have implemented efficiency-improvement projects and already have realized total cost savings of more than $81 million annually. This paper provides an overview of the assessment efforts undertaken and presents a summary of the major energy and cost savings identified to date. The paper also discusses specific results from assessments conducted at four plants in the automotive manufacturing operations and supporting industries. These particular assessments were conducted at facilities that produce engine castings, plastic films used for glass laminates, forged components, and at a body spray painting plant.

Kelly Kissock, Arvind Thekdi, Len Bishop

2006-01-05T23:59:59.000Z

6

Plant-Wide Energy Efficiency Assessment at the Arizona Portland Cement Plant in Rillito, Arizona  

SciTech Connect

A Department of Energy Plant-wide Assessment was undertaken by Arizona Portland Cement (APC) beginning in May 2005. The assessment was performed at APC’s cement production facility in Rillito, Arizona. The assessment included a compressed air evaluation along with a detailed process audit of plant operations and equipment. The purpose of this Energy Survey was to identify a series of energy cost savings opportunities at the Plant, and provide preliminary cost and savings estimates for the work. The assessment was successful in identifying projects that could provide annual savings of over $2.7 million at an estimated capital cost of $4.3 million. If implemented, these projects could amount to a savings of over 4.9 million kWh/yr and 384,420 MMBtu/year.

Stephen J. Coppinger, P.E.; Bruce Colburn, Ph.D., P.E., CEM

2007-05-17T23:59:59.000Z

7

Commonwealth Aluminum: Manufacturer Conducts Plant-Wide Energy Assessments at Two Aluminum Sheet Production Operations;  

SciTech Connect

DOE Industrial Technologies Program case study describes the savings possible if Commonwealth Aluminum (now Aleris Rolled Products) makes improvements noted in energy assessments at two aluminum mills.

Not Available

2006-04-01T23:59:59.000Z

8

Valero: Houston Refinery Uses Plant-Wide Assessment to Develop an Energy Optimization and Management System  

SciTech Connect

This Industrial Technologies Program case study describes an energy assessment team's recommendations for saving $5 million in energy, water, and other costs at an oil refinery in Houston, Texas.

Not Available

2005-08-01T23:59:59.000Z

9

Plant Wide Assessment of Energy Usage Utilizing SitEModelling as a Tool for Optimizing Energy Consumption  

SciTech Connect

The Evonik Degussa Corporation is the global market leader in the specialty chemicals industry. Innovative products and system solutions make an indispensable contribution to our customers' success. We refer to this as "creating essentials". In fiscal 2004, Degussa's 45,000 employees worldwide generated sales of 11.2 billion euros and operating profits (EBIT) of 965 million euros. Evonik Degussa Corporation has performed a plant wide energy usage assessment at the Mapleton, Illinois facility, which consumed 1,182,330 MMBTU in 2003. The purpose of this study was to identify opportunities for improvement regarding the plant’s utility requirements specific to their operation. The production is based mainly on natural gas usage for steam, process heating and hydrogen production. The current high price for natural gas in the US is not very competitive compared to other countries. Therefore, all efforts must be taken to minimize the utility consumption in order to maximize market position and minimize fixed cost increases due to the rising costs of energy. The main objective of this plant wide assessment was to use a methodology called Site Energy Modelling (SitE Modelling) to identify areas of potential improvement for energy savings, either in implementing a single process change or in changing the way different processes interact with each other. The overall goal was to achieve energy savings of more than 10% compared to the 2003 energy figures of the Mapleton site. The final savings breakdown is provided below: - 4.1% savings for steam generation and delivery These savings were accomplished through better control schemes, more constant and optimized loading of the boilers and increased boiler efficiency through an advanced control schemes. - 1.6% savings for plant chemical processing These saving were accomplished through optimized processing heating efficiency and batch recipes, as well as an optimized production schedule to help equalize the boiler load (e.g. steam consumption).

Ralf Janowsky, Ph.D.; Tracey Mole, Ph.D.

2007-12-31T23:59:59.000Z

10

U.S. DOE Industrial Technologies Program – Technology Delivery Plant-Wide Assessment at PPG Industries, Natrium, WV  

SciTech Connect

PPG and West Virginia University performed a plantwide energy assessment at the PPG’s Natrium, WV chemical plant, an energy-intensive manufacturing facility producing chlor-alkali and related products. Implementation of all the assessment recommendations contained in this report could reduce plant energy consumption by 8.7%, saving an estimated 10,023,192 kWh/yr in electricity, 6,113 MM Btu/yr in Natural Gas, 401,156 M lb/yr in steam and 23,494 tons/yr in coal and reduce carbon dioxide emissions by 241 mm lb/yr. The total cost savings would amount to approximately $2.9 mm/yr. Projects being actively implemented will save $1.7 mm/yr; the remainder are undergoing more detailed engineering study.

Lester, Stephen R.; Wiethe, Jeff; Green, Russell; Guice, Christina; Gopalakrishnan, Bhaskaran; Turton, Richard

2007-09-28T23:59:59.000Z

11

Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Genetic Genetic Variability of Cell Wall Degradability for the Selection of Alfalfa with Improved Saccharification Efficiency Marc-Olivier Duceppe & Annick Bertrand & Sivakumar Pattathil & Jeffrey Miller & Yves Castonguay & Michael G. Hahn & Réal Michaud & Marie-Pier Dubé # Her Majesty the Queen in Right of Canada 2012 Abstract Alfalfa (Medicago sativa L.) has a high potential for sustainable bioethanol production, particularly because of its low reliance on N fertilizer. We assessed near-infrared reflec- tance spectroscopy (NIRS) as a high-throughput technique to measure cell wall (CW) degradability in a large number of lignified alfalfa stem samples. We also used a powerful immu- nological approach, glycome profiling, and chemical analyses to increase our knowledge of the composition of CW poly- saccharides of alfalfa stems with various levels

12

Plant Wide Assessment for Johns Manville Waterville Ohio Plant 1  

SciTech Connect

The report describes activites carried out at the palnt to identify energy savings in various energy user systems. The results list areas of energy savings potential and metods of energy savings.

Kelly Kissock; Arvind Thekdi

2006-07-02T23:59:59.000Z

13

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

14

GE Appliance Park Louisville, KY Plant Wide Assessment Final Report October 25th, 2007  

SciTech Connect

Used a team of experts to analyze and model major systems at a large industrial appliance manufacturer. During the data gathering stage, the team specifically looked for baselining the efficiency of the systems as well as developing short term and longer term efficiency projects. Electrical distribution, Compressed air generation and thermal heat recovery for the production facility and front office heating and cooling optimization were all baselined during the study.

Chandon Rao; Richard Urschel

2007-10-25T23:59:59.000Z

15

Climate VISION: Resources and Links - Plant Assessments  

Office of Scientific and Technical Information (OSTI)

Plant Assessments Plant Assessments Plant-Wide Assessments Plant-wide assessments are one way to work with the DOE Industrial Technologies Program—most companies realize a minimum of $1 million in annual energy savings after just one assessment. Plants are selected through a competitive solicitation process, and agree to a minimum 50% cost-share for implementing the assessment. An industry-defined team conducts an on-site analysis of total energy use and identifies opportunities to save energy in your overall operations and in motor, steam, compressed air, and process heating systems. The recommendations could include implementing emerging technologies that would be particularly effective in your operation. These emerging technologies, although on the forefront of industrial manufacturing, are successful and commercially

16

Materials - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Assessment The staff of the Energy Systems Division has a long history of technical and economic analysis of the production and recycling of materials for transportation...

17

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

18

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

19

RADIOLOGICAL ASSESSMENT  

Office of Legacy Management (LM)

ASSESSMENT ASSESSMENT and STABILIZATION' SCENARIOS PARRERSBURG,'W. VA. SITE FEBRUARY 1980 M. CARSON J. COFFMAN N. MANDELTORT, ! Division of Nuclear Service Operations Chem-Nuclear\ Systems, Inc. 240 Stoneridge Dr., Suite 100 Columbia, South Carolina 29210 Prepared for AMAX Specialty Hetals Corporation One Greenwich Plaza Greenwich, Connecticut 06830 During July' 1978, Chem-Nuclear Systems, Inc. (CNSI) began an assessment program for AMAX Specialty Metals Corp."(AMAX) u to locate, quantify, and evaluate the'extent of environmental radioactive contamination at the AMAX Parkersburg., West Virginia former zirconium/hafnium processing facility. In addition, preliminary ive assessments were to be made to assist AMAX in evaluat ,ing alternat methods for site cleanup.

20

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Rapid Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment Assessment of Lignin Content and Structure in Switchgrass (Panicum virgatum L.) Grown Under Different Environmental Conditions David G. J. Mann & Nicole Labbé & Robert W. Sykes & Kristen Gracom & Lindsey Kline & Isabella M. Swamidoss & Jason N. Burris & Mark Davis & C. Neal Stewart Jr. Published online: 13 October 2009 # Springer Science + Business Media, LLC. 2009 Abstract Switchgrass (Panicum virgatum L.) is a candi- date feedstock in bioenergy, and plant breeding and molecular genetic strategies are being used to improve germplasm. In order to assess these subsequent modifica- tions, baseline biomass compositional data are needed in a relevant variety of environments. In this study, switch- grass cv. Alamo was grown in the field, greenhouse, and growth chamber and harvested into individual leaf and stem tissue components. These components

22

Sleep Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Sleep Assessment Sleep Assessment 1 | Thank you for taking the time to complete this extensive form. Sleep disturbances and/or fatigue are most often the result of many factors. In order to best treat your condition we need to understand your symptoms and history. Please bring your completed assessment form to your appointment. To schedule an appointment please call 505 844-HBES (4237). Name: Employee ID#: Date: Male Female Age: Health Plan : United BCBSNM Other: Referred by: Sleep and Health History In general, would you describe your sleep as: Refreshing Not Refreshing How would you rate your sleep? Very Good Good Adequate Poor Very Poor How would you describe your sleep problem? Sleep Problem (indicate all that apply) Duration of problem

23

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

24

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

25

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

26

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

27

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

28

Integrated Environmental Assessment Part III: Exposure Assessment  

E-Print Network (OSTI)

of an Official ISEA Glossary,” Journal of Exposure AnalysisGeneva. IPCS (2001) Glossary of Exposure Assessment-Related

McKone, Thomas E.; Small, Mitchell J.

2006-01-01T23:59:59.000Z

29

Solar radiation resource assessment  

DOE Green Energy (OSTI)

The bulletin discusses the following: introduction; Why is solar radiation resource assessment important Understanding the basics; the solar radiation resource assessment project; and future activities.

Not Available

1990-11-01T23:59:59.000Z

30

LUser_CompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competency Assessments (Employee) Competency Assessments (Employee) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Participating in Competency Assessments (Employee) Purpose The purpose of this job aid is to guide users and supervisors through the step-by-step process of participating in a competency assessment by viewing gaps, assigning items, conducting a self- assessment, reviewing completed assessments, and viewing the competency history. View Gaps and Assign Items 6 Steps Task A Employee: Conduct Self Assessment 8 Steps Task B Employee: Review Completed Assessment - 6 Steps Task C Employee: View Competency History 11 Steps Task D SuccessFactors Learning v 6.4 User Job Aid Participating in Competency Assessments (Employee)

31

Solar Resource Assessment  

DOE Green Energy (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

32

Substation Site Assessment  

Science Conference Proceedings (OSTI)

Companies assess environmental conditions at their facilities as part of routine operations and in preparation of property transfers. This report and template provide a simple, efficient guide for assessing substation facilities.

2001-02-09T23:59:59.000Z

33

Updated Operations Assessment Guideline  

Science Conference Proceedings (OSTI)

The Operations Assessment Guideline (OAG) can be used to assess the organization and processes of operations departments. An internal utility team or third party can use this report to guide a team composed of industry experts and members of the assessed utility. This report is an update to EPRI report 1008520, Operations Assessment Guideline, published in March 2005. This improved version includes insights gained after three years of experience with the original report.

2008-03-25T23:59:59.000Z

34

Software project effort assessment  

Science Conference Proceedings (OSTI)

Software project assessments and postmortem analyses can increase the success of future projects and forthcoming project phases. However, although assessments and analyses are well-presented in the software engineering literature, they are short of descriptions ... Keywords: assessment, effort, final report, postmortem, project management, retrospective

Topi Haapio; Anne Eerola

2010-12-01T23:59:59.000Z

35

Philosophy on Vulnerability Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

capabilities/vat/assess/ capabilities/vat/assess/ ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, 9700 South Cass Ave., Argonne, IL Philosophy on Vulnerability Assessments Argonne Vulnerability Assessment Team Roger G. Johnston, Ph.D., CPP , 630-252-6168 1. There are a number of conventional tools for finding security vulnerabilities. These include security surveys, risk management, design basis threat, CARVER Method, Delphi Method, software vulnerability assessment tools, infrastructure modeling, etc. 2. These tools have some value, and indeed we have used them all. 3. Experience has shown, however, that these methods do not usually result in dramatic improvements to security, nor do they reliably predict catastrophic security incidents that

36

System Assessment Standards: Defining the Market for Industrial Energy Assessments  

E-Print Network (OSTI)

2008. “System Assessment Standards: Defining the Market forL ABORATORY System Assessment Standards: Defining the Marketemployer. System Assessment Standards: Defining the Market

Sheaffer, Paul

2010-01-01T23:59:59.000Z

37

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Memorandum , Part II. Screening Level Risk Assessment 92-225-161-49 K-33 Cooling Towers screening risk assessments (2) K-770 sites screening risk assessment (9...

38

Industrial Assessment Center  

SciTech Connect

The University of Dayton (UD) performed energy assessments, trained students and supported USDOE objectives. In particular, the UD Industrial Assessment Center (IAC) performed 96 industrial energy assessment days for mid-sized manufacturers. The average identified and implemented savings on each assessment were $261,080 per year and $54,790 per year. The assessments served as direct training in industrial energy efficiency for 16 UD IAC students. The assessments also served as a mechanism for the UD IAC to understand manufacturing energy use and improve upon the science of manufacturing energy efficiency. Specific research results were published in 16 conference proceedings and journals, disseminated in 22 additional invited lectures, and shared with the industrial energy community through the UD IAC website.

J. Kelly Kissock; Becky Blust

2007-04-17T23:59:59.000Z

39

INDUSTRIAL ASSESSMENT CENTER PROGRAM  

Science Conference Proceedings (OSTI)

Since its establishment in 1990, San Diego State University’s Industrial Assessment Center (IAC) has served close to 400 small and medium-sized manufacturing plants in Southern California. SDSU/IAC’s efforts to transfer state-of-the-art technologies to industry have increased revenues, cultivated creativity, improved efficiencies, and benefited the environment. A substantial benefit from the program has been the ongoing training of engineering faculty and students. During this funding cycle, SDSU/IAC has trained 31 students, 7 of the graduate. A total of 92 assessments and 108 assessment days were completed, resulting in 638 assessment recommendations.

ASFAW BEYENE

2008-09-29T23:59:59.000Z

40

Industrial Energy Efficiency Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Energy Efficiency Assessments Lynn Price Staff Scientist China Energy Group Energy Analysis Department Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Industrial Energy Efficiency Assessments - Definition and overview of key components - International experience - Chinese situation and recommendations - US-China collaboration Industrial Energy Efficiency Assessments - Analysis of the use of energy and potential for energy efficiency in an industrial facility * Current situation * Recommendations for improving energy efficiency * Cost-benefit analysis of recommended options * An action plan for realizing potential savings Types of Industrial Energy Efficiency Assessments - Preliminary or walk-through - Detailed or diagnostic Audit criteria

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

ORISE: Hazard Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and collaborators have, for example, conducted an assessment of health outcomes among nuclear technology workers at the RocketdyneAtomics International (AI) Santa Susana Field...

42

PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE  

E-Print Network (OSTI)

Disaster Preparedness, Response and Recovery #12;2 Louisiana State University Health Sciences CenterDISASTER PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE TOOLKIT (Disaster-PAST) Methods to Enhance

43

Condition and Life Assessment  

Science Conference Proceedings (OSTI)

Table 3   Regulations and standards on life assessment...to TRD 508 Italy ISPESL (1992). Components of steam generators and

44

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

45

INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER  

SciTech Connect

The U. S. Department of Energy’s Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

MELINDA KRAHENBUHL

2010-05-28T23:59:59.000Z

46

DOEEA-1203 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

47

SPAT 15 - Assessment  

Science Conference Proceedings (OSTI)

In the Spring of 1997, the Department of Energy's Department Standards Committee (DSC) convened a Standards Process Action Team (SPAT-15) to evaluate assessment processes within the DOE complex. If time and resources permitted, the team was also to evaluate assessment processes used by private industry conducting similar work and activities. The specific task statement was as follows: "Define the attributes of assessment programs that effectively support organizational feedback and improvement of safety systems at all the different levels of contractor and Department organizations." The team gathered information on existing assessment programs through surveys and presentations by representatives from national laboratories, processing facilities, and remediation sites. Examples of assessment programs described in this report encompass site-wide, individual facility, and task level applications within the DOE compIex

Bartley, J.C. (Coordinator)

1998-08-01T23:59:59.000Z

48

Integrated assessment briefs  

Science Conference Proceedings (OSTI)

Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

NONE

1995-04-01T23:59:59.000Z

49

Risk Assess - updated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Development Risk Assessment Software Development Risk Assessment Note: The purpose of this prompt list is to provide project managers with a tool for identifying and planning for potential project risks. It is process-based and supports the framework established by the DOE Software Engineering Methodology. It will be used within the stage exit process as an additional tool to ensure that the project manager has identified and is managing known risk factors. Additional detailed information describes the various risk factors and how to score them. Performing a risk assessment is an important step in being prepared for potential problems that can occur within any software project. During the risk assessment, if a potential risk is identified, a solution or plan of action should be developed. (A problem analyzed and planned

50

Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

51

FINAL ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

52

IAAP Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEEDS ASSESSMENT-DECEMBER 2001 NEEDS ASSESSMENT-DECEMBER 2001 Burlington Atomic Energy Commission Plant- Former Worker Program A US DOE funded project conducted by: Dr. Laurence Fuortes, Principal Investigator The University of Iowa College of Public Health Department of Occupational and Environmental Health 5 2940 Steindler Building Iowa City, IA 52242 TEL: 319 335 9819 FAX: 319 335 9200 BACEP-FWP Needs Assessment 1. INTRODUCTION In August of 2000, the University of Iowa College of Public Health initiated a needs assessment study to evaluate whether or not individuals formerly employed by the Department of Energy (DOE) at the Iowa Army Ammunition Plant (IAAP) near Burlington, Iowa, would benefit from a Former Worker Medical Surveillance Program. These workers were employed at IAAP in the atomic weapons industry on what was known at the facility as Line 1 or Division B at the

53

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

54

Bayesian Climate Change Assessment  

Science Conference Proceedings (OSTI)

A Bayesian fingerprinting methodology for assessing anthropogenic impacts on climate was developed. This analysis considers the effect of increased CO2 on near-surface temperatures. A spatial CO2 fingerprint based on control and forced model ...

L. Mark Berliner; Richard A. Levine; Dennis J. Shea

2000-11-01T23:59:59.000Z

55

Assessment of Phase Conductors  

Science Conference Proceedings (OSTI)

As transmission systems age, utilities are increasingly concerned about the reliability of aging conductors, especially ACSR conductors. Traditional methods for assessing conductors involve identifying the circuits that pose the greatest reliability risk and subjecting samples from suspect lines to tensile testing, but a range of corrosion detection methods have become available that increase the options available to utilities. This report describes several methods available for conductor assessment.

2009-12-23T23:59:59.000Z

56

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

57

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

58

Luser_SupCompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

employee assessment, reviewing completed assessments, and viewing the competency history. Task A. View Gaps and Assign Items From the Home page, click the My Employees tab....

59

Second National Climate Assessment (2009)  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt What is the Second National Climate Assessment? The Second National Climate Assessment, entitled Global Change Impacts in the United States, was published in...

60

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

risk assessment information used to evaluate and remediate legacy contamination from the Manhattan Project. The RAIS was designed to provide all risk assessment processes in a...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

62

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Depamnf!l1tal Elel1l~nt&$ite july 23, 2009 Office of Information Resources Office of Management DOE Headquarters, Germantown, Germantown Computer Center Server Room Nameonl1fol'l11i1tion Sysleijlprl'f 'Project FOIAXpress ExhibitProj~tUID TBD NeWPIA ~ Update D Please indicate whether this is a new

63

Bioenergy Assessment Toolkit  

NLE Websites -- All DOE Office Websites (Extended Search)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte Produced under direction of the United States Agency for International Development by the National Renewable Energy Laboratory (NREL) under Interagency Agreement AEG-P-00-00003-00; Work for Others Agreement number 3010543; Task Numbers WFE2.1012, WFE2.1013, and WFE2.1014. Technical Report NREL/TP-6A20-56456 October 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 303-275-3000 * www.nrel.gov Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte

64

TECHNOLOGY READINESS ASSESSMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

65

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site August 1, 2009 U.S. Department of Energy; Office of Science; Office of Workforce Development for Teachers and Scientists (WDTS) System location - Pacific Northwest National Laboratory, Richland, WA Name of Information iPASS System for DOE Office of Science laboratory fellowship programs, including

66

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

67

Windows technology assessment  

SciTech Connect

This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

Baron, J.J.

1995-10-01T23:59:59.000Z

68

HEPA Filter Vulnerability Assessment  

SciTech Connect

This assessment of High Efficiency Particulate Air (HEPA) filter vulnerability was requested by the USDOE Office of River Protection (ORP) to satisfy a DOE-HQ directive to evaluate the effect of filter degradation on the facility authorization basis assumptions. Within the scope of this assessment are ventilation system HEPA filters that are classified as Safety-Class (SC) or Safety-Significant (SS) components that perform an accident mitigation function. The objective of the assessment is to verify whether HEPA filters that perform a safety function during an accident are likely to perform as intended to limit release of hazardous or radioactive materials, considering factors that could degrade the filters. Filter degradation factors considered include aging, wetting of filters, exposure to high temperature, exposure to corrosive or reactive chemicals, and exposure to radiation. Screening and evaluation criteria were developed by a site-wide group of HVAC engineers and HEPA filter experts from published empirical data. For River Protection Project (RPP) filters, the only degradation factor that exceeded the screening threshold was for filter aging. Subsequent evaluation of the effect of filter aging on the filter strength was conducted, and the results were compared with required performance to meet the conditions assumed in the RPP Authorization Basis (AB). It was found that the reduction in filter strength due to aging does not affect the filter performance requirements as specified in the AB. A portion of the HEPA filter vulnerability assessment is being conducted by the ORP and is not part of the scope of this study. The ORP is conducting an assessment of the existing policies and programs relating to maintenance, testing, and change-out of HEPA filters used for SC/SS service. This document presents the results of a HEPA filter vulnerability assessment conducted for the River protection project as requested by the DOE Office of River Protection.

GUSTAVSON, R.D.

2000-05-11T23:59:59.000Z

69

Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

70

Industrial Assessment Center  

SciTech Connect

Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

Dr. Diane Schaub

2007-03-05T23:59:59.000Z

71

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

72

Peer assessment using aropä  

Science Conference Proceedings (OSTI)

Aropä is a web-based peer assessment support tool that has been used extensively in a wide variety of settings over the past three years. We describe the design of Aropä and how it can be configured, and present some results from a research ...

John Hamer; Catherine Kell; Fiona Spence

2007-01-01T23:59:59.000Z

73

Packaged CHP System Assessment  

Science Conference Proceedings (OSTI)

The Packaged CHP System Assessment report provides an analysis of packaged combined heat and power (CHP) systems. The report summarizes and compares the technical characteristics of commercial product lines with electric power output up to 3,000 kWe.

2004-03-22T23:59:59.000Z

74

Geothermal industry assessment  

DOE Green Energy (OSTI)

An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

Not Available

1980-07-01T23:59:59.000Z

75

Supplemental Environmental Assessment  

E-Print Network (OSTI)

In 2007, the U.S. Department of the Navy (Navy) prepared the Environmental Assessment for the Disposal of Naval Activity Puerto Rico (2007 EA) to evaluate the potential environmental impacts associated with the disposal of Naval Activity Puerto Rico (NAPR) in accordance with the

unknown authors

2011-01-01T23:59:59.000Z

76

Crossarm Inspection and Assessment  

Science Conference Proceedings (OSTI)

Linemen frequently use wood pole inspection methods to inspect crossarms, and little work has been done to specifically address the inspection of wood, steel, or fiberglass crossarms. This report outlines the development of a test bed and associated protocols required to assess currently available and prospective inspection technologies and techniques for evaluation of in-service crossarms.

2009-12-23T23:59:59.000Z

77

Venetie, Alaska energy assessment.  

Science Conference Proceedings (OSTI)

This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

2013-07-01T23:59:59.000Z

78

Energy Efficiency Potential Assessment: (Appendices)  

Science Conference Proceedings (OSTI)

This document contains the appendices to EPRI Report 1008911, "Energy Efficiency Potential Assessment."

2003-07-28T23:59:59.000Z

79

Oak Ridge Reservation Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

80

National Climate Assessment: Production Team  

NLE Websites -- All DOE Office Websites (Extended Search)

NCA & Development Advisory Committee NCA & Development Advisory Committee Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Production Team Print E-mail National Climate Assessment Staff (USGCRP National Coordination Office) Current NCA Staff Dr. Fabien Laurier, Director, Third National Climate Assessment Dr. Glynis Lough, Chief of Staff for the National Climate Assessment Emily Therese Cloyd, Engagement Coordinator for the National Climate Assessment Bryce Golden-Chen, Program Coordinator for the National Climate Assessment Alison Delgado, Scientist Dr. Ilya Fischhoffkri, Scientist Melissa Kenney, Indicators Coordinator Dr. Fred Lipschultz, Regional Coordinator for the National Climate Assessment

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates32.doc More Documents & Publications EV Guideline Assessment Templates...

82

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates320.doc More Documents & Publications EV Guideline Assessment Templates...

83

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC  

Open Energy Info (EERE)

Assessments and Assessment Capabilities in APEC Assessments and Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Biomass Topics Resource assessment Website http://www.nrel.gov/internatio Country Australia, Brunei, Canada, Chile, China, Indonesia, Japan, South Korea, Malaysia, Mexico, New Zealand, Papua New Guinea, Peru, Philippines, Russia, Chinese Taipei, Thailand, United States, Vietnam Australia and New Zealand, South-Eastern Asia, Northern America, South America, Eastern Asia, South-Eastern Asia, Eastern Asia, Eastern Asia, South-Eastern Asia, Central America, Australia and New Zealand, Melanesia, South America, South-Eastern Asia, Eastern Europe, , South-Eastern Asia, Northern America, South-Eastern Asia

84

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

85

DOEM-1123 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEM-1123 DOEM-1123 Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washin%E E ~ U.S. Department of Energy Richland, Washington November 1995 DOE/EA - 1 123 ENVIRONMENTAL ASSESSMENT TRANSFER OF NORMAL AND LOW-ENRICHED URANIUM BILLETS TO THE UNITED KINGDOM HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY NOVEMBER 1995 This page intentionally left blank. U.S. Department of Energy Glossary Glossary Acronyms and Ini ti a1 isms ALARA BNFL CERL CFR CY DOE DOH DOT EA FR IAEA IMO I so LCF LEU LSA NAC NCRP NEA , NEPA PNL rem WAC WHC As Low As Reasonably Achievable British Nuclear Fuels Limited, Inc. Construction Engineering Resources Laboratory Code o f Federal Regulations Calendar Year

86

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

87

DOEEA-0984 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

88

Mercury Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED WITH COAL-FIRED POWER PLANTS: IMPACTS OF LOCAL DEPOSITIONS *T.M. Sullivan 1 , F.D. Lipfert 2 , S.M. Morris 2 , and S. Renninger 3 1 Building 830, Brookhaven National Laboratory, Upton, NY 11973 2 Private Consultants 3 Department of Energy, National Energy Technology Laboratory, Morgantown, WV ABSTRACT The U.S. Environmental Protection Agency has announced plans to regulate emissions of mercury to the atmosphere from coal-fired power plants. However, there is still debate over whether the limits should be placed on a nationwide or a plant-specific basis. Before a nationwide limit is selected, it must be demonstrated that local deposition of mercury from coal-fired power plants does not impose an excessive local health risk. The principal health

89

EV Guideline Assessment Templates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates |1. Process: Organization |2. Guideline No: 1|3. Contractor: |4.Contract/project(s): | ||||| ||||| |5. Guideline Statement: Define the authorized work elements for the program. A work breakdown structure (WBS), tailored for effective internal management control, is commonly used in this process. | || |6. Documentation Required: 1) CLINs 2) WBS 3) WBS Dictionary | || || || |7. Instructions: Why this is important: The WBS represents the entire scope of work in the project, a "picture" of the work. The first level is the total system, and it continues down in successively smaller elements until it reaches the level of detail necessary for management action and control. This picture of the work is needed to facilitate traceability, ensure the

90

DOEEA-1177 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Environmental Assessment SalvageDemolition of 200 West Area, 200 East Area and 300 Area Steam Plants, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington October 1996 DOE/EA-1177 ENVIR0NMEN"AL ASSESSMENT' FOR THE SALVAGE/DEMOLITION OF 200 WEST AREA, '200 EAST AREA, AND 300 AREA STEAM PLANTS U . S . DEPARTMENT OF ENERGY RICHLAND, WASHINGTON OCTOBER 1996 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available origid document. DOE/EA- 1177 U.S. Department o f Energy Preface Appendices. Additional information necessary t o support an understanding of the proposed action, a1 ternati ves , and potenti a1 impacts i s provided. Comments resul ti.ng from review o

91

Guidelines for Exposure Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Z-92/001 Z-92/001 May 1992 Guidelines for Exposure Assessment Published on May 29, 1992, Federal Register 57(104):22888-22938 These guidelines replace the previously issued final Guidelines for Estimating Exposures (September 24, 1986), Federal Register 51(185):34042-34054, and the Proposed Guidelines for Exposure-Related Measurements (December 2, 1988), Federal Register 53(232):48830- 48853. Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Note: This document represents the final guidelines. A number of editorial corrections have

92

National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Production Team Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Overview Print E-mail What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

93

needs_assessment.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Office Needs Assessment Workshop Education Office Needs Assessment Workshop On October 2, 40 educators from 15 school districts met at Fermilab to discuss the status of science education in the context of state and national frameworks. Districts were selected at random from DuPage and Kane counties, and superintendents selected a team to represent the district at the workshop. The group provided input to the Education Office regarding future program direction. Over the next few months the Education Office will be reviewing program offerings in light of the issues raised below. In the meantime, we invite you to visit the Teacher Resource Center which serves as our clearinghouse or call Susan Dahl at 630-840-3094 for assistance. If you would like a scientist to visit your classroom, participate in a career fair or serve as

94

Oil Market Assessment  

Gasoline and Diesel Fuel Update (EIA)

Logo Oil Market Assessment - September Logo Oil Market Assessment - September 12, 2001 EIA Home Page Based on Energy Information Administration (EIA) contacts and trade press reports, overall U.S. and global oil supplies appear to have been minimally impacted by yesterday's terrorist attacks on the World Trade Center and the Pentagon. Rumors of scattered closures of U.S. refineries, pipelines, and terminals were reported, and Louisiana Offshore Oil Port operations were partially suspended. While the NYMEX and New York Harbor were temporarily closed, operations are expected to resume soon. Most, if not all petroleum industry infrastructure is expected to resume normal operations today or in the very near term. Prices at all levels (where markets were open) posted increases yesterday, but many prices fell today, as initial reactions

95

Pantex Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Needs Assessment Pantex Needs Assessment Phase I Summary and Recommendation Based upon the availability of information to access former workers, and given the knowledge regarding past exposures to hazardous agents, it is recommended that a Phase II examination program be established for former Pantex workers. This will be in keeping with other DOE mandates and programs, and will assist with the current DOE compensation program. I. Introduction and Background The Department of Energy has established a program to meet the medical oversight needs of former workers who worked at a variety of Department of Energy facilities in connection with the nuclear programs of the United States. It has been recognized that these workers might have been exposed to potentially hazardous materials, and that they were deserving of medical

96

Boiler Condition Assessment Guideline  

Science Conference Proceedings (OSTI)

This report Boiler Condition Assessment Guideline provides a concise overview of procedures developed by the Electric Power Research Institute EPRI to help power plant operators cost-effectively determine the extent of degradation and remaining life of key boiler components. The Guideline draws from EPRIs detailed area-specific guidelines, which in turn are based on extensive research findings by EPRI, member companies, and other organizations. This Guideline offers a starting point for power plant perso...

2010-12-23T23:59:59.000Z

97

Protective Coatings Assessment  

Science Conference Proceedings (OSTI)

This report describes assessments of ceramic and thermal spray coatings that have advanced significantly or recently been marketed for use in the utility boiler industry to reduce slagging, mitigate fireside corrosion and potentially, circumferential cracking due to cyclic temperature variations. These innovations promise to enhance coating quality as well as reduce time and labor required to protect large areas of the boiler waterwalls. Coatings may also enable plants to improve production rates; thereb...

2011-12-22T23:59:59.000Z

98

Draft Risk Assessment Processes  

Science Conference Proceedings (OSTI)

A cyber security risk assessment process includes the characterization of assets. A thorough asset characterization process can lead to a more robust threat characterization. One means of enhancing the thoroughness of the asset-and-threat characterization processes is to improve the characterization mechanisms. This technical update supports this approach by providing the results of initial research and developing a framework to support further analysis.This project builds upon the work ...

2012-12-28T23:59:59.000Z

99

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

100

Aging Cable Assessment Guideline  

Science Conference Proceedings (OSTI)

Medium- and low-voltage cables have provided reasonable service in power plants. However, there is a concern that cables that have experienced long periods of stressed service and especially wet service might degrade and fail in service. Because most plants have had few problems with cables, little on-staff experience with cables exists at most sites. This report provides information that will be of practical use when assessing cable longevity in adverse environments and service conditions that may ...

2013-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Field Guide: Coatings Assessment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has numerous products to help plant personnel meet the challenges of working with aging systems, structures, and components, but none that comprehensively address protective coatings and linings. This field guide provides a compilation of protective coating and lining information in a form that allows the user to have a ready reference available during condition assessment of the various protective coatings and linings used in the plant.

2012-05-14T23:59:59.000Z

102

Assessment summary, Jan. 2004  

E-Print Network (OSTI)

and internal use as focal point) Draft “consideration of use” battery Rewrite paper expanding Research & Network models SQW meeting in Cambridge SIKE/Assessment: 3 to 5 months Lessons learned from Connections - briefings First implementation of IRO at CU... support letters from ONE & Scotland Coordination meeting of Cummings/Horner/Tanner SIKE & KICs: 3 Greitzer meetings planned Innovation Centre: Set BT/CW priorities for March/April events Brief CMI management (What was said to Davies, Aldridge...

103

Assessment and Outlook  

E-Print Network (OSTI)

My assignment at this conference is to assess where we are in high-energy physics and speculate on where we might be going. This frees me from any obligation to summarize all that went on here and allows me to talk just about those topics that interest me the most at this time. I will let my prejudices show and talk a bit about physics in general, CP violation, neutrinos, accelerators, non-accelerator experiments, and even theory.

Burton Richter

2000-01-04T23:59:59.000Z

104

Integrated Assessment | Open Energy Information  

Open Energy Info (EERE)

Integrated Assessment Integrated Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Integrated Assessment: Mainstreaming sustainability into policymaking--A guidance manual Agency/Company /Organization: United Nations Environment Programme Topics: Background analysis Website: www.unep.ch/etb/publications/AI%20guidance%202009/UNEP%20IA%20final.pd Equivalent URI: cleanenergysolutions.org/content/times-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance References: Integrated Assessment[1] The Times Integrated Assessment Model (TIAM) comprises several thousand technologies in all sectors of the energy system. It is characterized by several technical and economic parameters and by emission coefficients for

105

Process Management Maturity Assessment Process Management Maturity Assessment  

E-Print Network (OSTI)

This paper outlines a Business Process Management implementation approach in a large international company. It introduces a Process Management Maturity Assessment (PMMA) which was developed to assess the implementation of Business Process Management. The maturity model is based on the assessment of nine categories which comprehensively cover all aspects which impact the success of Business Process Management. Some findings of the first assessment round are presented to illustrate the benefits of the PMMA approach.

Michael Rohloff; Michael Rohloff

2009-01-01T23:59:59.000Z

106

Integrated Assessment Modeling  

Science Conference Proceedings (OSTI)

This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

2012-10-31T23:59:59.000Z

107

Uncertainties in energy technology assessments  

E-Print Network (OSTI)

In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

Coate, David

1980-01-01T23:59:59.000Z

108

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents - ORR Risk Assessment Documents - ORR Bullet Baseline Risk Assessments Bullet Remedial Investigation/Feasibility Study Environmental Assessment Report South Campus Facility, Oak Ridge Tenn [DOE/OR/02-1274&D] Bullet Baseline Risk Assessment for Lower East Fork Poplar Creek [DOE/OR/1119 & D2 & V2] Bullet Remedial Investigation/ Feasibility Study Report for Lower Watts Bar Reservoir Operable Unit [DOE/OR/01 1282 & D1] [ORNL/ER-2] Bullet The Utility of Existing Data Conducting a CERCLA Baseline Risk Assessment for Lower Watts Bar Reservoir (draft) [ORNL/ER-?] Bullet East Fork Poplar Creek Sewer Line Beltway Remedial Investigation Report [DOE/OR/02-1119&D2] Bullet Screening Risk Assessments Bullet Preliminary Assessment of Radiation Doses to the Public from Cesium

109

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Debra Stewart at (865)482-2657 or dthomas3@utk.edu. Risk assessments conducted for the DOE-ORO should implement Guidance for Conducting Risk Assessments and Related Risk...

110

Performance Assessment Scoping - Hanford Example  

Performance Assessment Scoping - Hanford Example Linda Suttora Office of Environmental Compliance DOE-HQ Waste Processing Technical Exchange 2010

111

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

112

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

113

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

114

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network (OSTI)

WESTERN WATER ASSESSMENT WHITE PAPER Socioeconomic Impacts and Adaptation Strategies: Assessing://www.socioeconimpacts.org and is described in greater detail in a companion white paper, "Socioeconomic Impacts and Adaptation Strategies: Assessing Research on Drought, Climate Change and Recreation". This white paper discusses literature

Neff, Jason

115

Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment  

Science Conference Proceedings (OSTI)

This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

2009-06-01T23:59:59.000Z

116

TEPP Planning Products Model Needs Assessment Self Assessment Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Products Planning Products Model Needs Assessment Self Assessment Document Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-13.p65 1 Model Needs Assessment R E V 8 - 0 7 / 2 0 1 2 T r a n s p o r t a t i o n E m e r g e n c y P r e p a r e d n e s s P r o g r a m PURPOSE The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident involving radioactive material. 1.0 INTRODUCTION This Model Needs Assessment was developed by the Department of Energy's Transportation Emergency Preparedness Program (TEPP) as a planning and assessment tool for state, tribal, or local government officials. To implement this Model Needs Assessment, a designated official

117

NATURAL RESOURCES ASSESSMENT  

DOE Green Energy (OSTI)

The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

D.F. Fenster

2000-12-11T23:59:59.000Z

118

DOEYEA-0856 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEYEA-0856 DOEYEA-0856 Environmental Assessment for Construction and Operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory Berkeley, California December 1994 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

119

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

LCSAD-001, Ver. 2 LCSAD-001, Ver. 2 Linac Commissioning Safety Assessment Document for the National Synchrotron Light Source II Photon Sciences Directorate Version 2 May 11, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II ii LT-C-ESH-LCSAD-001 ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

120

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

122

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

BCSAD-001 BCSAD-001 Photon Sciences Directorate Booster Commissioning Safety Assessment Document For the National Synchrotron Light Source II Version 2 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

123

DOEIEA-1086 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86 86 Environmental Assessment for Amendments to 10 CFR Part 835 DISCLAIMER Portions of this document may be illegible i n electronic image products. Images are produced f h m the best avaiIable original document. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employes, makes any warranty, express or implied, or a s s u m e s any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spc- cific commercial product, process, or senrice by trade name, trademark, manufac-

124

Superfund Exposure Assessment Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

1-881001 1-881001 OSWER Directive 9285.5-1 April 1988 Superfund Exposure Assessment Manual U.S. Environmental Protection Agency Office of Remedial Response Washington, DC 20460 Notice This report was prepared under contract to an agency of the United States Government. Neither the United States Government nor any of its employees, contractors, subcontractors, or their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party' s use of or the results of such use of any information, apparatus, product, or process disclosed in this report, or represents that its use by such third party would not infringe on privately owned rights. ii Table of Contents Chapter Page List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

125

Minority energy assessment report  

SciTech Connect

The purpose of this research is to project household energy consumption, energy expenditure, and energy expenditure as share of income for five population groups from 1991 to 2009. The approach uses the Minority Energy Assessment Model (MEAM), developed by Argonne National Laboratory for the US Department of Energy's Office of Minority Economic Impact. The MEAM provides a framework that can be used to forecast regional energy consumption and energy expenditure for majority, black, Hispanic, poor, and nonpoor households. The forecasts of key macroeconomic and energy variables used as exogenous variables in the MEAM were obtained from the Data Resources, Inc., Macromodel and Energy Model. Generally, the projections of household energy consumption, expenditure, and energy expenditure as share of income vary across population groups and census regions.

Teotia, A.P.S.; Poyer, D.A.; Lampley, L.; Anderson, J.L.

1992-12-01T23:59:59.000Z

126

INEEL Source Water Assessment  

SciTech Connect

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL’s drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey’s Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency’s Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL’s Source Water Assessment. Of the INEEL’s 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL’s public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, Gerald

2003-03-01T23:59:59.000Z

127

Cassini data assessment report  

DOE Green Energy (OSTI)

On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

NONE

1998-08-01T23:59:59.000Z

128

Assessment of Initial Test Conditions for Experiments to Assess Irradiation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Initial Test Conditions for Experiments to Assess Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Irradiation-assisted stress corrosion cracking is a key materials degradation issue in today's nuclear power reactor fleet and affects critical structural components within the reactor core. The effects of increased exposure to irradiation, stress, and/or coolant can substantially increase susceptibility to stress-corrosion cracking of austenitic steels in high-temperature water environments. Despite 30 years of experience, the underlying mechanisms of Irradiation Assisted Stress Corrosion Cracking (IASCC) are unknown. Extended service conditions will increase the exposure

129

Welding Cutting and Brazing Assessment Plan Assessment plan ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been...

130

Perceptual quality assessment for compressed video  

E-Print Network (OSTI)

Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

Yang, Kai-Chieh

2007-01-01T23:59:59.000Z

131

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Needs Assessment Hanford Needs Assessment July 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing...

132

Pantex Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment Pantex Needs Assessment December 2003 This Needs Assessment for former Pantex workers was developed for the purpose of collecting existing information relevant to...

133

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

134

Hydrogen energy assessment  

SciTech Connect

The purpose of this assessment is to define the near term and long term prospects for the use of hydrogen as an energy delivery medium. Possible applications of hydrogen are defined along with the associated technologies required for implementation. A major focus in the near term is on industrial uses of hydrogen for special applications. The major source of hydrogen in the near term is expected to be from coal, with hydrogen from electric sources supplying a smaller fraction. A number of potential applications for hydrogen in the long term are identified and the level of demand estimated. The results of a cost benefit study for R and D work on coal gasification to hydrogen and electrolytic production of hydrogen are presented in order to aid in defining approximate levels of R and D funding. A considerable amount of data is presented on the cost of producing hydrogen from various energy resources. A key conclusion of the study is that in time hydrogen is likely to play a role in the energy system; however, hydrogen is not yet competitive for most applications when compared to the cost of energy from petroleum and natural gas.

Salzano, F J; Braun, C [eds.

1977-09-01T23:59:59.000Z

135

Geothermal Energy Resource Assessment  

DOE Green Energy (OSTI)

This report covers the objectives and the status of a long-range program to develop techniques for assessing the resource potential of liquid-dominated geothermal systems. Field studies underway in northern Nevada comprise a systematic integrated program of geologic, geophysical, and geochemical measurements, necessary to specify a drilling program encompassing heat flow holes, deep calibration holes, and ultimately, deep test wells. The status of Nevada field activities is described. The areas under study are in a region characterized by high heat flow where temperatures at depth in some geothermal systems exceed 180 C. Areas presently being examined include Beowawe Hot Springs in Whirlwind Valley. Buffalo Valley Hot Springs, Leach Hot Springs in Grass Valley, and Kyle Hot Springs in Buena Vista Valley. Geologic studies encompass detailed examinations of structure and lithology to establish the geologic framework of the areas. The geothermal occurrences are characterized by zones of intense fault intersection, which furnish permeable channelways for the introduction of meteoric water into regions of high temperature at depth.

Wollenberg, H.A.; Asaro, F.; Bowman, H.; McEvilly, T.; Morrison, F.; Witherspoon, P.

1975-07-01T23:59:59.000Z

136

Fueling area site assessment  

SciTech Connect

This report provides results of a Site Assessment performed at the Fuel Storage Area at Buckley ANG Base in Aurora, Colorado. Buckley ANG Base occupies 3,328 acres of land within the City of Aurora in Arapahoe County, Colorado. The Fuel Storage Area (also known as the Fueling Area) is located on the west side of the Base at the intersection of South Powderhorn Street and East Breckenridge Avenue. The Fueling Area consists of above ground storage tanks in a bermed area, pumps, piping, valves, an unloading stand and a fill stand. Jet fuel from the Fueling Area is used to support aircraft operations at the Base. Jet fuel is stored in two 200,000 gallon above ground storage tanks. Fuel is received in tanker trucks at the unloading stand located south and east of the storage tanks. Fuel required for aircraft fueling and other use is transferred into tanker trucks at the fill stand and transported to various points on the Base. The Fuel Storage Area has been in operation for over 20 years and handles approximately 7 million gallons of jet fuel annually.

1996-08-15T23:59:59.000Z

137

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

Assess Oportunities Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

138

UAIEE and Industrial Assessment Centers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UAIEE and IACs UAIEE and IACs Michael B Muller IAC Field Manager Rutgers University 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * Started in 1976 * Currently 26 Centers across the US * Almost 15,000 Assessments * Assessments in all 50 States * Over 111,000 Recommendations * Continues to Grow yearly by: * 400 assessments * 3,000 recommendations 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 IAC Assessments of Small and Medium Manufacturers 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * ABET Accredited Engineering Universities * Director must be a teaching faculty member

139

Advanced Distribution Automation Technical Assessments  

Science Conference Proceedings (OSTI)

This 2008 progress report on advanced distribution technical assessments focused on the International Electrotechnical Commission (IEC) TC-57 body of standards.

2008-12-19T23:59:59.000Z

140

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Conducting Risk Assessments and Related Risk Activities for the DOE-ORO Environmental Management Program. BJCOR-271 Guidance for Treatment of Variability and...

142

Conformity Assessment Workshop April 2012  

Science Conference Proceedings (OSTI)

... 2_4 USDA Agricultural Marketing Service - The Breadth of Conformity Assessment Activities in the Federal Arena: Dana K. Stahl, USDA - AMS. ...

2013-06-12T23:59:59.000Z

143

Internal Dose Assessment (IDA) Spreadsheet  

Science Conference Proceedings (OSTI)

The purpose of the Internal Dose Assessment (IDA) Spreadsheet is to calculate internal occupational dose following the methodology described in the EPRI Alpha Monitoring Guidelines.

2007-04-12T23:59:59.000Z

144

PRIVACY IMPACT ASSESSMENT: INL Communications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessments, for reqUirements and additional guidance for conducting a PIA: http:www.directives.doe.govpdfsdoedoetextlneword206o2061.pdf Please complete electronically:...

145

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

011B. Office of Research and Development, Washington, D.C. 1992. Exposure Factors Handbook. EPA6008- 89043. Office of Health and Environmental Assessment, Washington, D.C....

146

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. EPA, Washington, D.C. 1992. Risk Assessment Forum. Wildlife Exposure Factors Handbook. Vol. I. United Staes Environmental Protection Agency. Office of Research and...

147

RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT  

DOE Green Energy (OSTI)

Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

2012-03-31T23:59:59.000Z

148

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

A Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes January 2013 #12;Assessment Handbook 2 Table of Contents Table of Contents............................................................................................1 Assessment Handbook

Hemmers, Oliver

149

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes July 2012 #12;Assessment Handbook University of Nevada, Las Vegas 1 Table of Contents Assessment Handbook

Hemmers, Oliver

150

EA-1835: Environmental Assessment Determination | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Determination EA-1835: Environmental Assessment Determination Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project in Chester...

151

Idaho National Laboratory - Hydropower Program - Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software State Resource Assessments Resource Assessments Reports Technology Transfer Virtual Hydropower Prospector Virtual Hydropower Prospector do Brasil...

152

Software products for risk assessment  

Science Conference Proceedings (OSTI)

For assessing risks in all environments it is often necessary to use a systematic approach of modeling and simulation with the aim to simplify this process in the framework of designing new technological lines, machines, equipment and processes. Also ... Keywords: crisis management, risk assessment, software products

Jozef Ristvej; Tomas Lovecek

2011-11-01T23:59:59.000Z

153

Cogeneration Assessment Methodology for Utilities  

E-Print Network (OSTI)

A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic assessment model, and a data base to track customers over time. A case study is presented describing the background, procedures, and results of a cogeneration investigation for Northeast Utilities.

Sedlik, B.

1983-01-01T23:59:59.000Z

154

Assessment of Distributed Resource Technologies  

Science Conference Proceedings (OSTI)

This report assesses the current status and prospects for future improvements of distributed resource (DR) technologies: microturbines, PEM fuel cells, solid oxide fuel cells, molten carbonate fuel cells, phosphoric acid fuel cells, reciprocating engines, combustion turbines, stirling engines, and energy storage devices. It also assesses the communications, interconnection, and control systems used by these devices.

1999-12-14T23:59:59.000Z

155

TMCC WIND RESOURCE ASSESSMENT  

DOE Green Energy (OSTI)

North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

Turtle Mountain Community College

2003-12-30T23:59:59.000Z

156

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents ORNL RA Graphic Results ORNL Baseline Risk Assessment Results ORNL Screening Risk Assessment Results ORNL Other Risk Assessment Results ORNL RA Graphic Results WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse (No Fish) Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Industrial Landuse

157

Performance Assessment Community of Practice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L L l W t C t B d High-Level Waste Corporate Board Performance Assessment Community of Practice Community of Practice John E. Marra, Ph.D. Associate Laboratory Director Associate Laboratory Director 5 March 2009 DOE EM HLW Corporate Board Meeting Phoenix, Arizona DOE-EM HLW Corporate Board Meeting Performance Assessment Process Community of Practice Background EM Senior Management would like to have g improved consistency in the execution of the Performance Assessment* process; Originally formed a sub-committee to draft a guidance document for practitioners; Th b itt b li C it f The sub-committee now believes a Community of Practice having broader scope should replace it; Draft Charter in review and presented for Draft Charter in review and presented for discussion. * Performance Assessment (PA) is used broadly to encompass assessments for LLW

158

Viability Assessment Volume 4  

SciTech Connect

Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

DOE

1998-12-01T23:59:59.000Z

159

Advanced Manufacturing Office: Industrial Assessment Centers (IACs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Assessment Industrial Assessment Centers (IACs) to someone by E-mail Share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Facebook Tweet about Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Twitter Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Google Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Delicious Rank Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Digg Find More places to share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on AddThis.com... Industrial Assessment Centers (IACs) Learn More Learn how companies have benefited from IAC assessments. Search the IAC Database for recommendations and savings achieved.

160

Criteria for assessing the quality of nuclear probabilistic risk assessments  

E-Print Network (OSTI)

The final outcome of a nuclear Probabilistic Risk Assessment (PRA) is generally inaccurate and imprecise. This is primarily because not all risk contributors are addressed in the analysis, and there are state-of-knowledge ...

Zhu, Yingli, 1976-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Resource assessment methodologies and applications  

Science Conference Proceedings (OSTI)

Resource assessment refers to the estimation and evaluation of mineral materials in the ground, both discovered and undiscovered. In such as an assessment, attention is centered on materials in such form, concentration, and location that they might be extractable under foreseeable economic and technological conditions. In practical terms, there is no such thing as an all-purpose resource assessment. Diverse groups of people interested in such assessments, be they mineral exploration planners, economic analysts, land use planners, or policymakers, will look for aspects that are most pertinent to their own field and time frame of interest. For example, exploration analysts would be most interested in the geological potential for discovering certain types of deposits in a region; mining engineers in the physical and chemical characteristics of deposits already discovered; and economists in the possible mineral-supply stream that might be generated in the future. No single assessment can throw light on all aspects of conceivable interest, and every type of assessment will have its conceptual and analytical limitations. Six major resource assessment methodologies are presented: areal value, crustal abundance, volumetric, deposit modeling, Delphi, and intergrated synthesis. Each methodology has certain strengths and weaknesses and type of resource estimate, factos which must be considered before application of any one technique. Each of these methods is discussed.

Dorian, J.P.; Zwartendyk, J.

1984-01-01T23:59:59.000Z

162

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

163

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

164

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network (OSTI)

Improved system efficiency can contribute to an industrial facility’s bottom line and also improve reliability and better utilize assets. Despite these opportunities, many industrial facilities continue to have unrealized system optimization potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems for consumers in determining the relative quality of assessment service offerings. Achieving certification for energy efficiency will require industrial facilities to document a specified reduction in energy intensity. Application of System Assessment Standards will offer industrial facilities seeking certification a well-defined path toward improved energy intensity. System Assessment Standards will help define the market for both users and providers of industrial system assessment services. Use of these standards will provide assurance that a particular assessment represents a recognized threshold for accuracy and completeness. The goal is a significant increase in system energy efficiency improvements in U.S. industry.

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

165

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Print E-mail Overview Print E-mail Below you will find answers to the most frequently asked questions about the First National Climate Assessment Report. alt Goal and Architecture Organization and Mandate Regions Sectors Synthesis Report Scenarios Relationship to Other Activities Goal and Architecture What was the goal of the First National Assessment? The overall goal of the National Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the public, the environment, and the nation's resources. Special efforts were made to involve the end users - such as water resource managers, farmers, and decisionmakers - in all stages of the Assessment so that the final outcome was useful to the widest audience possible and was truly developed through a participatory process.

166

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents Y-12 RA Graphic Results Y-12 Baseline Risk Assessment Results Y-12 Screening Risk Assessment Results Bullet Graphic Risk Results Arrow Bear Creek Valley Maps Residential Landuse Groundwater - Total Hazard (range: 1 - 900) Groundwater - Total Hazard (range: 0.1 - 1) Groundwater - Total Risk (range: 10-4 - 1) Groundwater - Total Risk (range: 10-5 - 10-4) Groundwater - Total Risk (range: 10-6 - 10-5) Groundwater - Dichloroethane, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Risk Groundwater - Dichloroethane, 1,2- Risk Groundwater - Dichloroethene, 1,2- Hazard Groundwater - Nitrate Hazard Groundwater - Radium Risk Groundwater - Technetium-99 Risk Groundwater - Tetrachloroethene Hazard Groundwater - Tetrachloroethene Risk

167

NREL: Energy Analysis: Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Assessment Resource Assessment NREL has developed maps and tools to conduct renewable energy resource assessments at the state, national and international level. Around the world, interest is growing in renewable energy as a strategy to mitigate greenhouse gas emissions and increase energy security. The starting point for new renewable energy projects is a characterization of the renewable resources available across a region, a resource assessment. NREL uses geospatial data sets to identify regions that are appropriate for renewable development and those that should be excluded such as water bodies, urban areas, cropland, forests, very steep terrain, and protected areas. Once resource data are available for a region, NREL can estimate the theoretical potential, or upper limit, for renewable energy in an area.

168

Second National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt An affiliated website was created specifically for the 2009 National Climate Assessment so that the report would be more accessible to a variety of interested...

169

Fort Carson Wind Resource Assessment  

DOE Green Energy (OSTI)

This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

Robichaud, R.

2012-10-01T23:59:59.000Z

170

Probabilistic Risk Assessment - A Bibliography  

Science Conference Proceedings (OSTI)

Probabilistic risk analysis is an integration of failure modes and effects analysis (FEMA), fault tree analysis and other techniques to assess the potential for failure and to find ways to reduce risk. This bibliography references 160 documents in the ...

Program NASA Scientific and Technical Information

2000-07-01T23:59:59.000Z

171

Fiscal Year 2012 Revegetation Assessment  

Science Conference Proceedings (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

172

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the...

173

Environmental Design Space model assessment  

E-Print Network (OSTI)

The Environmental Design Space (EDS) is a multi-disciplinary design tool used to explore trade-offs among aircraft fuel burn, emissions, and noise. This thesis uses multiple metrics to assess an EDS model of a Boeing 777 ...

Spindler, Phillip Michael

2007-01-01T23:59:59.000Z

174

Assessing Cloud-Phase Conditions  

Science Conference Proceedings (OSTI)

In situ microphysics measurements made during the First and Third Canadian Freezing Drizzle Experiments (CFDE I and III, respectively) have been used to assess the relative responses to ice and liquid hydrometeors for several common instruments. ...

Stewart G. Cober; George A. Isaac; Alexei V. Korolev; J. Walter Strapp

2001-11-01T23:59:59.000Z

175

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

176

EA-1853: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT DOE/EA-1853 PERRIN RANCH WIND ENERGY INTERCONNECTION PROJECT COCONINO COUNTY, ARIZONA Prepared for U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457 Phoenix, Arizona 85005 Prepared by SWCA Environmental Consultants 3033 North Central Avenue, Suite 145 Phoenix, Arizona 85012 (602) 274-3831 www.swca.com July 2011 July 2011 i CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 1 1. INTRODUCTION ................................................................................................................................ 1 1.1 BACKGROUND .......................................................................................................................... 1

177

Guam Initial Technical Assessment Report  

SciTech Connect

Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

2011-04-01T23:59:59.000Z

178

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well developed asset management implementation. Consequently an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in a risk assessment process. However, most proposed power delivery equipment risk models require for their successful application some probabilistic representation describing the chances of equipment ...

2012-12-14T23:59:59.000Z

179

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well-developed asset management implementation. Consequently, an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in the risk assessment process. However, for their application, most proposed power delivery equipment risk models require some probabilistic representation describing the chances of equipment failure. This re...

2011-12-21T23:59:59.000Z

180

Steam Generator Integrity Assessment Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance for evaluating the condition of steam generator (SG) tubes based on nondestructive examination (NDE) or in situ pressure testing. This integrity assessment is normally performed during a reactor refueling outage. Nuclear power plant licensees who follow this document's guidelines will have satisfied their requirements for condition monitoring and operational assessment as defined in the Nuclear Energy Institute (NEI) initiative, Steam Generator Program Guidelines, NEI 97-06.

2006-07-25T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

SunShot Initiative: Solar Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Resource Assessment to Solar Resource Assessment to someone by E-mail Share SunShot Initiative: Solar Resource Assessment on Facebook Tweet about SunShot Initiative: Solar Resource Assessment on Twitter Bookmark SunShot Initiative: Solar Resource Assessment on Google Bookmark SunShot Initiative: Solar Resource Assessment on Delicious Rank SunShot Initiative: Solar Resource Assessment on Digg Find More places to share SunShot Initiative: Solar Resource Assessment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards Balance of Systems

182

Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment  

Science Conference Proceedings (OSTI)

To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

NONE

1997-04-01T23:59:59.000Z

183

Qualitative methods for assessing risk  

SciTech Connect

The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

Mahn, J.A. [Sandia National Labs., Albuquerque, NM (United States); Hannaman, G.W. [Science Applications International Corp., San Diego, CA (United States); Kryska, P. [Science Applications International Corp., Albuquerque, NM (United States)

1995-04-01T23:59:59.000Z

184

Argonne National Laboratory Launches Bioenergy Assessment Tools...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools September 30, 2013 - 4:00pm Addthis A researcher...

185

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 1993 30, 1993 EA-0921: Final Environmental Assessment Ambulatory Research and Education Center, Oregon Health Sciences University July 1, 1993 EA-0847: Final Environmental Assessment Live Fire Range at the Central Training Academy, Albuquerque, New Mexico June 25, 1993 EA-0841: Final Environmental Assessment Import of Russian Plutonium-238 June 3, 1993 EA-0923: Final Environmental Assessment Winnett School District Boiler Replacement Project June 1, 1993 EA-0792: Final Environmental Assessment Nonnuclear Consolidation Environmental Assessment April 2, 1993 EA-0822: Final Environmental Assessment Idaho National Engineering Laboratory Consolidated Transportation Facility January 29, 1993 EA-0688: Final Environmental Assessment Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

186

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC) Print E-mail National Climate Assessment and Development Advisory Committee (NCADAC) pdf | html A Notice by...

187

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC); Notice of Open Meeting (6122013) Print E-mail National Climate Assessment and Development Advisory...

188

Problem Formulations for Ecological Risk Assessments Conducted...  

NLE Websites -- All DOE Office Websites (Extended Search)

- deformities, fin erosion, lesions, and tumors ERA - ecological risk assessment HHRA - human health risk assessments ow K - octanol-water partition coefficients oc K - organic...

189

Solar Schools Assessment and Implementation Project: Financing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options...

190

Supplemental Guidance for Assessing Susceptibility from Early...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment, ORD Michael P. Firestone, Office of Children's Health Protection, OA Lynn Flowers, National Center for Environmental Assessment, ORD R. Woodrow Setzer,...

191

Independent Oversight Assessment , Idaho National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment , Idaho National Laboratory Site - May 2010 Independent Oversight Assessment , Idaho National Laboratory Site - May 2010 May 2010 Environmental Monitoring at the Idaho...

192

EA-1533: Floodplain Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1533: Floodplain Assessment Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This environmental assessment (EA) provides sufficient...

193

Natural Resource Damages Assessment | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Council Report Calls for Official Natural Resource Damage Assessment for LANL NRDA PreAssessment Screen, January 2010 Factsheet: Los Alamos National Laboratory...

194

Assess the U.S. Climate  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment (NCA). The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. The Assessment: Informs the...

195

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network (OSTI)

Audit & Assessment Program Manual • C-5 Appendix C. ExamplesAudit & Assessment Program Manual Prepared by: Environment,1 Original Issue All Rename manual; allow for internal and

Thorson, Patrick

2009-01-01T23:59:59.000Z

196

Industrial Assessment Centers Help Students, Communities Learn...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency March...

197

Training Needs Assessment Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Needs Assessment Training Training Needs Assessment Training The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's...

198

EA-1859: Floodplain Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9: Floodplain Assessment EA-1859: Floodplain Assessment Kirkwood Community College Wind Energy Facility Kirkwood Community College in Cedar Rapids, Iowa is proposing the...

199

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

DOE Green Energy (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

200

Guidelines for Ecological Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

5/002F 5/002F April 1998 Guidelines for Ecological Risk Assessment (Published on May 14, 1998, Federal Register 63(93):26846-26924) Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. NOTICE This report contains the full text of the Guidelines for Ecological Risk Assessment. However, the format of this version differs from the Federal Register version, as follows: text boxes that are included in this document at their point of reference were instead listed at the end of the Federal Register document as text notes, due to format limitations for Federal Register documents.

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Impact Assessments | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Assessments Impact Assessments Impact Assessments PIA Template with Guidance (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf) DOE Jobs Online (Hiring Management) (pdf) FORM EIA 457-A/G Residential Energy Consumption Survey (pdf) Office of Hearings and Appeals (OHA) Tracking System (pdf) Corporate Human Resources Information System (CHRIS) (pdf) Energy Inspector General Project Tracking System (EIGPT) (pdf) Electronic DOE Information Security System (eDISS) (pdf)

202

SRS Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

203

resource assessment | OpenEI  

Open Energy Info (EERE)

resource assessment resource assessment Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago) Date Updated Unknown Keywords Feasibility Study resource assessment Solar Energy SWERA Bangladesh Wind Energy Data application/pdf icon swera_bangladesh_fullreport.pdf (pdf, 2.7 MiB)

204

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphic Results Graphic Results Baseline Risk Assessment Results Screening Risk Assessment Results Other Risk Assessment Results Graphic Results K-25 Groundwater Residential Landuse Bedrock Wells - Total Hazard (range: 1-30) Bedrock Wells - Total Hazard (range: 0.1 - 1) Bedrock Wells - Total Risk Bedrock Wells - Arsenic Risk Bedrock Wells - Dichloroethene, 1,1- Risk Bedrock Wells - Trichloroethene Risk Unconsolidated Wells - Total Hazard (range: 1-150) Unconsolidated Wells - Total Hazard (range: 0.1 - 1) Unconsolidated Wells - Total Risk (range:10-4 - 1) Unconsolidated Wells - Total Risk (range:10-6 - 10-4) Unconsolidated Wells - Arsenic Risk Unconsolidated Wells - Trichloroethene Risk ORNL WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk

205

Ion exchange technology assessment report  

SciTech Connect

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-12-31T23:59:59.000Z

206

A total risk assessment methodology for security assessment.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

2009-06-01T23:59:59.000Z

207

Advanced Network Toolkit for Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Toolkit for Assessments Network Toolkit for Assessments and Remote Mapping (ANTFARM) Uses existing information to passively map control systems networks and identify cyber security perimeters Control systems operators require a map of their energy control system network in order to identify its electronic security perimeter, critical to meeting the North American Electric Reliability Corporation's (NERC) Critical Infrastructure Protection (CIP) standards. However, purchasing active, online scanning tools specifically for network mapping can be costly, and these tools can disrupt control system function, causing system latency and possibly affecting power supply. The ANTFARM software tool enables system operators to remotely and

208

Spent Fuel Transportation Risk Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Transportation Risk Assessment Fuel Transportation Risk Assessment (SFTRA) Draft NUREG-2125 Overview for National Transportation Stakeholders Forum John Cook Division of Spent Fuel Storage and Transportation 1 SFTRA Overview Contents * Project and review teams * Purpose and goals * Basic methodology * Improvements relative to previous studies * Draft NUREG structure and format * Routine shipment analysis and results * Accident condition analysis and results * Findings and conclusions * Schedule 2 SFTRA Research and Review Teams * Sandia National Laboratory Research Team [$1.8M; 9/06-9/12] - Doug Ammerman - principal investigator - Carlos Lopez - thermal - Ruth Weiner - RADTRAN * NRC's SFTRA Technical Review Team - Gordon Bjorkman - structural

209

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

210

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

211

Video systems for alarm assessment  

SciTech Connect

The purpose of this NUREG is to present technical information that should be useful to NRC licensees in designing closed-circuit television systems for video alarm assessment. There is a section on each of the major components in a video system: camera, lens, lighting, transmission, synchronization, switcher, monitor, and recorder. Each section includes information on component selection, procurement, installation, test, and maintenance. Considerations for system integration of the components are contained in each section. System emphasis is focused on perimeter intrusion detection and assessment systems. A glossary of video terms is included. 13 figs., 9 tabs.

Greenwoll, D.A.; Matter, J.C. (Sandia National Labs., Albuquerque, NM (United States)); Ebel, P.E. (BE, Inc., Barnwell, SC (United States))

1991-09-01T23:59:59.000Z

212

Health impact assessment in Korea  

Science Conference Proceedings (OSTI)

Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

Kang, Eunjeong, E-mail: marchej@kihasa.re.r [Division for Health Promotion Research, Korea Institute for Health and Social Affairs, 268 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu, Seoul (Korea, Republic of); Lee, Youngsoo, E-mail: leeys@kei.re.k [Centre for Environmental Impact Assessment Review, Korea Environment Institute, 290 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu (Korea, Republic of); Harris, Patrick, E-mail: Patrick.harris@unsw.edu.a [Centre for Health Equity Training, Research and Evaluation, part of the UNSW, Research Centre for Primary Health Care and Equity, UNSW, Locked Mail Bag 7103, Liverpool BC, NSW 1981 (Australia); Koh, Kwangwook, E-mail: kwkoh@hanafos.co [Department of Preventive Medicine, Kosin University, 149-1 Dongsam-1-dong, Youngdo-gu, Busan (Korea, Republic of); Kim, Keonyeop, E-mail: pmkky@knu.ac.k [Department of Preventive Medicine, School of Medicine and Department of Public Health, Graduate School of Public Health, KyungPook National University, 101 Dongin 2 , Jung-gu, Daegu (Korea, Republic of)

2011-07-15T23:59:59.000Z

213

Adaptive capacity and its assessment  

SciTech Connect

This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

Engle, Nathan L.

2011-04-20T23:59:59.000Z

214

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

215

BRITISH COLUMBIA Gully Assessment Procedure  

E-Print Network (OSTI)

strategies and #12;Gully Assessment Procedure Guidebook iv prescriptions designed to accommodate resource).........................................................15 Section 5 Fan Destabilization Potential OPR 37 (1)(c), WLFMR 64 (2)(a......................................30 3. Design and construction of roads across gully systems: when to consult a qualified registered

216

State Energy Data Needs Assessment  

Reports and Publications (EIA)

This report responds to Section 805(d) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-140, requiring the Energy InformationAdministration to assess State-level energy data needs and submit to Congress a plan to address those needs.

Information Center

2009-01-01T23:59:59.000Z

217

Mexico Wind Resource Assessment Project  

Science Conference Proceedings (OSTI)

A preliminary wind energy resource assessment of Mexico that produced wind resource maps for both utility-scale and rural applications was undertaken as part of the Mexico-U.S. Renewable Energy Cooperation Program. This activity has provided valuable information needed to facilitate the commercialization of small wind turbines and windfarms in Mexico and to lay the groundwork for subsequent wind resource activities. A surface meteorological data set of hourly data in digital form was utilized to prepare a more detailed and accurate wind resource assessment of Mexico than otherwise would have been possible. Software was developed to perform the first ever detailed analysis of the wind characteristics data for over 150 stations in Mexico. The hourly data set was augmented with information from weather balloons (upper-air data), ship wind data from coastal areas, and summarized wind data from sources in Mexico. The various data were carefully evaluated for their usefulness in preparing the wind resource assessment. The preliminary assessment has identified many areas of good-to-excellent wind resource potential and shows that the wind resource in Mexico is considerably greater than shown in previous surveys.

Schwartz, M.N.; Elliott, D.L.

1995-05-01T23:59:59.000Z

218

Transformer Efficiency Assessment - Okinawa, Japan  

Science Conference Proceedings (OSTI)

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-08-01T23:59:59.000Z

219

Transformer Efficiency Assessment - Okinawa, Japan  

SciTech Connect

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-05-01T23:59:59.000Z

220

Assessing Energy Resources Webinar Presentation Slides  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides from the DOE Office of Indian Energy webinar on assessing energy resources.

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EA-0931: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-0931: Final Environmental Assessment Center for Molecular Electronics University of Missouri, St. Louis This Environmental Assessment...

222

Guidelines for Carcinogen Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

P-03/001F P-03/001F March 2005 Guidelines for Carcinogen Risk Assessment Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1. PURPOSE AND SCOPE OF THE GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2. ORGANIZATION AND APPLICATION OF THE GUIDELINES . . . . . . . . . . . 1-3 1.2.1. Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.2. Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1.3. KEY FEATURES OF THE CANCER GUIDELINES .

223

Thoughts on Hazard Assessment (Oct)  

NLE Websites -- All DOE Office Websites (Extended Search)

Hazard Assessment of Chemical Air Hazard Assessment of Chemical Air Contaminants Measured in Residences J.M. Logue, T.E. McKone, M. H. Sherman, B.C. Singer Environmental Energy Technologies Division June 2010 Funding was provided by the U.S. Dept. of Energy Building Technologies Program, Office of Energy Efficiency and Renewable Energy under DOE Contract No. DE-AC02-05CH11231; by the U.S. Dept. of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control through Interagency Agreement I-PHI-01070, and by the California Energy Commission through Contract 500-08-06. LBNL Report Number 3650-E 1 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States

224

Winter Fuels Market Assessment 2000  

Gasoline and Diesel Fuel Update (EIA)

September 13, 2000 September 13, 2000 Winter Fuels Market Assessment 2000 09/14/2000 Click here to start Table of Contents Winter Fuels Market Assessment 2000 West Texas Intermediate Crude Oil Prices Perspective on Real Monthly World Oil Prices, 1976 - 2000 U.S. Crude Oil Stocks Total OECD Oil Stocks Distillate and Spot Crude Oil Prices Distillate Stocks Expected to Remain Low Distillate Stocks Are Important Part of East Coast Winter Supply Consumer Winter Heating Oil Costs Natural Gas Prices: Well Above Recent Averages Annual Real Natural Gas Prices by Sector End-of-Month Working Gas in .Underground Storage Residential Prices Do Not Reflect the Volatility Seen in Wellhead Prices Consumer Natural Gas Heating Costs Winter Weather Uncertainty Author: John Cook Email: jcook@eia.doe.gov

225

Hanford Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment for Medical Surveillance of Needs Assessment for Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

226

SITEWIDE ENVIRONMENTAL ASSESSMENT EA-1008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT EA-1008 for CONTINUED DEVELOPMENT OF NAVAL PETROLEUM RESERVE NO. 3 WR-3) Natrona County, Wyoming Prepared For U.S. Department of Energy Casper, Wyoming July 1995 OISTRIBUTION OF THIS DOCUMENT is UNLIMITED& i Portions of this document be illegible in electronic image products. Images are produced from the best available original dOCUIIlent, c AGENCY: ACTION: DEPARTMENT OF ENERGY Continued Development - Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Continued Development of Naval Petroleum Reserve No. 3 (DOE/EA-1008) SUMMARY: The Secretary of Energy is required by law to "explore, prospect, conserve, develop, use, and operate" the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum

227

Assessment of Project Management Experience  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Applicant Name: Applicant Supervisor: Date (mm/dd/yyyy): Directions: Step 1: Use this template to show project management experience for CEG competency 1.12.2. Rate your experience (0 - 5) in the following project management related activities using the scale below. Step 2: Sign the completed form and have your supervisor review and sign it. Step 3: Once approved by your supervisor, submit the form as part of your Level I certification package. Note: Project management experience is distinguished from FPD experience and applies to general project management activities and experience. Positions that do not count towards experience in project management include: program manager, property manager, health, safety and security (HSS) positions, and

228

INEEL Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Engineering and Environmental Laboratory Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures Appendix C: High Exposure Ranking Matrix

229

INEEL Production Workers Needs Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance Program Surveillance Program at Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures

230

Mongolia wind resource assessment project  

DOE Green Energy (OSTI)

The development of detailed, regional wind-resource distributions and other pertinent wind resource characteristics (e.g., assessment maps and reliable estimates of seasonal, diurnal, and directional) is an important step in planning and accelerating the deployment of wind energy systems. This paper summarizes the approach and methods being used to conduct a wind energy resource assessment of Mongolia. The primary goals of this project are to develop a comprehensive wind energy resource atlas of Mongolia and to establish a wind measurement program in specific regions of Mongolia to identify prospective sites for wind energy projects and to help validate some of the wind resource estimates. The Mongolian wind resource atlas will include detailed, computerized wind power maps and other valuable wind resource characteristic information for the different regions of Mongolia.

Elliott, D.; Chadraa, B.; Natsagdorj, L.

1998-09-07T23:59:59.000Z

231

Metal-air battery assessment  

DOE Green Energy (OSTI)

The objective of this report is to evaluate the present technical status of the zinc-air, aluminum/air and iron/air batteries and assess their potential for use in an electric vehicle. In addition, this report will outline proposed research and development priorities for the successful development of metal-air batteries for electric vehicle application. 39 refs., 25 figs., 11 tabs.

Sen, R.K.; Van Voorhees, S.L.; Ferrel, T.

1988-05-01T23:59:59.000Z

232

Applications of Probabilistic Risk Assessment  

SciTech Connect

This report provides a summary of potential and actual applications of Probabilistic Risk Assessment (PRA) technology and insights. Individual applications are derived from the experiences of a number of US nuclear utilities. This report identifies numerous applications of PRA techniques beyond those typically associated with PRAs. In addition, believing that the future use of PRA techniques should not be limited to those of the past, areas of plant operations, maintenance, and financial resource allocation are discussed. 9 refs., 3 tabs.

Burns, K.J.; Chapman, J.R.; Follen, S.M.; O'Regan, P.J. (Yankee Atomic Electric Co., Bolton, MA (USA))

1991-05-01T23:59:59.000Z

233

NIR Inspection and Assessment Technology  

Science Conference Proceedings (OSTI)

Corrosion of the core of ACSR conductors is a key determinant of conductor life, but the detection of this condition is difficult and expensive with currently available technology. While some existing technologies hold promise for enabling a relatively accurate assessment of core wire condition, as defined as the percent remaining galvanization, the currently available techniques are time consuming and expensive. Near-Infrared (NIR) optical spectroscopy may provide a cost-effective rapid scanning techniq...

2008-12-10T23:59:59.000Z

234

Assessment of Water Balance Models  

Science Conference Proceedings (OSTI)

Power generating plants perform water balance studies for a variety of reasons, and they use a range of different modeling approaches and tools to accomplish their specific objectives. This EPRI report presents the results of a project conducted with the objective of providing the industry and the interested public with an assessment of the value of water balance models to conserve and manage water. The report provides an overview of the state-of-the-art water balance models and identifies ...

2013-10-29T23:59:59.000Z

235

Preliminary melter performance assessment report  

Science Conference Proceedings (OSTI)

The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

1994-08-01T23:59:59.000Z

236

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 1, 2009 January 1, 2009 EA-1611: Final Environmental Assessment Interconnection Request for the Colorado Highlands Wind Project January 1, 2009 EA 1647: Supplemental Environmental Assessment Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia December 1, 2008 EA-1643: Final Environmental Assessment 10 CFR 431 Commercial Refrigeration Equipment December 1, 2008 EA-1633: Final Environmental Assessment Green Mountain Reservoir Substitution and Power Interference Agreements December 1, 2008 EA-1624: Final Environmental Assessment Auburn Landfill Gas Electric Generators and Anaerobic Digester Energy Facilities November 3, 2008 EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection

237

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 16, 2011 August 16, 2011 EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah August 15, 2011 EA-1888: Draft Environmental Assessment Old Town Fuel and Fiber Proposed Demonstration-Scale Integrated Biorefinery August 13, 2011 EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin August 12, 2011 EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California August 1, 2011 EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI

238

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1, 2011 February 1, 2011 EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan February 1, 2011 EA-1700: Final Environmental Assessment Computational Research and Theory Facility Project February 1, 2011 EA-1816: Final Environmental Assessment Town of Hempstead Wind-to-Hydrogen Project, Point Lookout, New February 1, 2011 EA-1815: Final Environmental Assessment Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio February 1, 2011 EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio February 1, 2011 EA-1818: Final Environmental Assessment Pettisville Local Schools Wind Energy Project, Pettisville, Fulton County,

239

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2009 September 4, 2009 EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development September 1, 2009 EA-1584: Final Environmental Assessment Sand Point Wind Installation Project Sand Point, Alaska September 1, 2009 EA-1788: Final Environmental Assessment Sapphire Energy, Inc.'s Integrated Algal Biorefinery (IABR) Facility in Columbus, New Mexico August 3, 2009 EA-1674: Final Environmental Assessment 10 CFR 431 Energy Conservation Program: Energy Conservation Standards for Refrigerated Bottled or Canned Beverage Vending Machines August 3, 2009 EA-1659: Final Environmental Assessment Proposed Demolition of Building 330 at Argonne National Laboratory August 3, 2009 EA-1652: Final Environmental Assessment

240

Vulnerability Assessment Team (VAT) - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Vulnerability Assessment Team Vulnerability Assessment Team VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Assessment of Residential GSHP System  

SciTech Connect

This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

Liu, Xiaobing [ORNL

2010-09-01T23:59:59.000Z

242

Biomass cogeneration. A business assessment  

DOE Green Energy (OSTI)

This guide serves as an overview of the biomass cogeneration area and provides direction for more detailed analysis. The business assessment is based in part on discussions with key officials from firms that have adopted biomass cogeneration systems and from organizations such as utilities, state and federal agencies, and banks that would be directly involved in a biomass cogeneration project. The guide is organized into five chapters: biomass cogeneration systems, biomass cogeneration business considerations, biomass cogeneration economics, biomass cogeneration project planning, and case studies.

Skelton, J.C.

1981-11-01T23:59:59.000Z

243

Assessment of government tribology programs  

SciTech Connect

An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

Peterson, M.B.; Levinson, T.M.

1985-09-01T23:59:59.000Z

244

National Climate Assessment: Background and Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Background and Process Print E-mail Background and Process Print E-mail Please view the links below to find out more about the background and process of the National Climate Assessment: National Climate Assessment Development & Advisory Committee Charter ( PDF) National Climate Assessment Proposed 2013 Report Outline [updated on 12/08/2011] (PDF) Strategy On May 20th, 2011 the National Climate Assessment released the following two strategy documents: National Climate Assessment Strategy Summary National Climate Assessment Engagement Strategy Federal Register Notices November 18, 2013 National Climate Assessment and Development Advisory Committee (NCADAC) Notice of Open Meeting pdf | html A Notice by the National Oceanic and Atmospheric Administration on 10/29/2013 This notice sets forth the schedule of a forthcoming meeting of the DoC NOAA National Climate Assessment and Development Advisory Committee (NCADAC).

245

Alternative Fuels Data Center: Renewable Fuels Assessment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Renewable Fuels Renewable Fuels Assessment to someone by E-mail Share Alternative Fuels Data Center: Renewable Fuels Assessment on Facebook Tweet about Alternative Fuels Data Center: Renewable Fuels Assessment on Twitter Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Google Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Delicious Rank Alternative Fuels Data Center: Renewable Fuels Assessment on Digg Find More places to share Alternative Fuels Data Center: Renewable Fuels Assessment on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Renewable Fuels Assessment The U.S. Department of Defense (DOD) prepared a report, Opportunities for DOD Use of Alternative and Renewable Fuels, on the use and potential use of

246

Global Forest Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Global Forest Resource Assessment Global Forest Resource Assessment Jump to: navigation, search Tool Summary Name: Global Forest Resource Assessment Agency/Company /Organization: Food and Agriculture Organization of the United Nations Sector: Land Focus Area: Forestry Topics: Resource assessment Resource Type: Publications Website: www.fao.org/forestry/fra/fra2010/en/ Global Forest Resource Assessment Screenshot References: Global Forest Research Assessment[1] Overview "FAO, in cooperation with its member countries, has monitored the world's forests at 5 to 10 year intervals since 1946. These global assessments provide valuable information to policy-makers in countries, to international negotiations, arrangements and organizations related to forests and to the general public. The Global Forest Resources Assessment

247

Home Energy Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assessments Energy Assessments Home Energy Assessments Addthis Description A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Speakers Jason Dispenza Duration 1:44 Topic Home Weatherization Home Energy Audits Consumption Credit Energy Department Video MR. : Core to any energy audit, you've got a blower door test; an infrared camera scan; combustion safety testing for homes with gas

248

O&M Assessments | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Inc. (PECI) presents an overview of O&M assessments for commercial building HVAC, lighting and control systems. It discusses what an O&M assessment involves, how it...

249

Assessment of Farmland Hosting Renewable Energy Systems  

Energy.gov (U.S. Department of Energy (DOE))

In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower...

250

Building Assessment and Energy Coordinator | Princeton Plasma...  

NLE Websites -- All DOE Office Websites (Extended Search)

Opportunities Environment, Safety & Health Procurement Division Technology Transfer Furth Plasma Physics Library Jobs Building Assessment and Energy Coordinator Department:...

251

Assessing Energy Resources Webinar Text Version  

Energy.gov (U.S. Department of Energy (DOE))

Download the text version of the audio from the DOE Office of Indian Energy webinar on assessing energy resources.

252

ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS  

E-Print Network (OSTI)

Renewable Energy Technologies   Transportation   Assessment Department of Energy, Industrial Technologies Program, Department of Energy, Industrial Technologies Program, 

Masanet, Eric

2010-01-01T23:59:59.000Z

253

Guide for Piping Stress Analysis and Assessment  

Science Conference Proceedings (OSTI)

This report gives recommendations for piping analysis methods and integration with inspection and operating data to give estimates of risk and remaining life. The scope of the document is as follows: Objectives of piping assessment Selected literature review of assessment practices for piping and other relevant components Failure modes Inspection and operating data Piping analysis: methods and data Risk assessment Integration of analysis, inspection, and operating data for assessments and recommendations...

2010-12-23T23:59:59.000Z

254

Alderwood Area Service Environmental Assessment.  

SciTech Connect

Bonneville Power Administration's (BPA's) proposal to build a new 115-kV transmission line and 115-12.5-kV, 25-MW substation in the Alderwood, Oregon, area is discussed in the attached Environmental Assessment. The proposed substation site has been relocated about 500 feet east of the site outlined in the Environmental Assessment, but in the same field. This is not a substantial change relevant to environmental concerns. Environmental impacts of the new site differ only in that: Two residences will be visually affected. The substation will be directly across Highway 36 from two houses and would be seen in their primary views. This impact will be mitigated by landscaping the substation to create a vegetative screen. To provide access to the new site and provide for Blachly-Lane Cooperative's distribution lines, a 60-foot-wide right-of-way about 200 feet long will be needed. The total transmission line length will be less than originally planned. However, the tapline into the substation will be about 50 feet longer. 4 figs.

United States. Bonneville Power Administration.

1982-06-01T23:59:59.000Z

255

Environmental impact assessment Geopressure Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment (EIA) addresses the expected programmatic activities of the Geopressure Subprogram of the Division of Geothermal Energy. The goal of the Geopressure Subprogram is to stimulate development of geopressured resources as an economic, reliable, operationally safe, and environmentally acceptable energy source. The subprogram includes activities in the areas of engineering research and development; resource exploration, assessment, and development; resource utilization including pilot and demonstration facilities; and environmental research and control technology development. It should be recognized that most of the subprogram activities extend over several years and are in their early stages of implementation at this time. The zones of potential geopressure development are in the region located along the Texas and Louisiana Gulf Coasts extending up to 200 miles (300 km) inland. Geopressured zones are sedimentary basins where water is trapped at high pressures within or below thick, nearly impermeable shale sequences. The confined water supports most or all of the weight of the overburden. This inhibits sediment compaction and causes formation pore pressure to exceed hydrostatic pressure. in sedimentary basins that are underlain by thin oceanic crust, upward thermal conduction from the mantle heats geopressured fluids and sediments to abnormally high temperatures, often in excess of 260 C (500 F).

None

1977-07-01T23:59:59.000Z

256

NGNP SITE 2 HAZARDS ASSESSMENT  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

Wayne Moe

2011-10-01T23:59:59.000Z

257

ORISE: Environmental Assessment and Health Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessments and Health Physics Environmental Assessments and Health Physics Performing environmental assessments and independent verification is essential to building public trust and confidence in radiological cleanup. As the U.S. Department of Energy (DOE) and other government agencies target contaminated sites across the country for decontamination and decommissioning, strict guidelines must be followed to ensure that property is effectively remediated before being released for public or private use. Through a combination of environmental assessments, health physics services, and radiochemistry analyses, the Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessment and verification at DOE cleanup sites across the country. ORISE applies its

258

Technology Needs Assessment Handbook | Open Energy Information  

Open Energy Info (EERE)

Technology Needs Assessment Handbook Technology Needs Assessment Handbook Jump to: navigation, search Tool Summary Name: Technology Needs Assessment Handbook Agency/Company /Organization: United Nations Development Programme Partner: United Nations Environment Programme Sector: Energy, Land Focus Area: Energy Efficiency Topics: Low emission development planning, Background analysis Resource Type: Guide/manual, Training materials, Lessons learned/best practices Website: content.undp.org/go/newsroom/publications/environment-energy/www-ee-li References: TNA Homepage[1] Logo: Technology Needs Assessment Handbook To assist countries, UNDP, in collaboration with Climate Technology Initiative (CTI), the EGTT and the UNFCCC Secretariat, developed a Handbook for conducting technology needs assessments for climate change.

259

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 1995 September 28, 1995 EA-0981: Final Environmental Assessment Solid Waste Retrieval Complex, Enhanced Radioactive and Mixed Waste Storage Facility, Infrastructure Upgrades, and Central Waste Support Complex, Hanford Site, Richland, Washington September 22, 1995 EA-1092: Final Environmental Assessment Decontamination and Dismantlement September 8, 1995 EA-1097: Final Environmental Assessment Solid waste Disposal - Nevada Test Site, Nye County, Nevada September 8, 1995 EA-1107: Final Environmental Assessment Construction and Operation of a Office Building at the Stanford Linear Accelerator Center September 8, 1995 EA-1087: Final Environmental Assessment Proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California

260

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2006 , 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington January 2, 2006 EA-1489: Final Environmental Assessment Construction and Operation of the Howard T. Ricketts Laboratory December 1, 2005 EA-1545: Final Environmental Assessment Proposed Withdrawal of Public Lands Within and Surrounding the Calliente Rail Corridor, Nevada December 1, 2005 EA-1538: Final Environmental Assessment Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site November 1, 2005 EA-1523: Final Environmental Assessment Address Proposed Site Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Parish, Louisiana

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2011 November 4, 2011 EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) November 1, 2011 EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory Modernization Planning October 31, 2011 EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research Center, Battleground Energy Recovery Project, Deer Park, Harris County, Texas (October 2011) October 28, 2011 EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) October 20, 2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado

262

Dermal Exposure Assessment: Principles and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Health and Health and EPA/600/8-91/011B Environmental Protection Environmental Assessment January 1992 Agency Washington, DC 20460 Interim Report Research and Development Dermal Exposure Assessment: Principles and Applications EPA/600/8 -91/OllB January 1992 Interim Report DERMAL EXPOSURE ASSESSMENT: PRINCIPLES AND APPLICATIONS Exposure Assessment Group Office of Health and Environmental Assessment U.S. Environmental Protection Agency Washington, D.C. 20460 DISCLAIMER This document is an interim report subject to review by the Science Advisory Board. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii

263

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2002 1, 2002 EA-1402: Final Environmental Assessment Methane Energy and Agricultural Development Port of Tillamook Bay Dairy Digester Project, Tillamook County, Oregon December 12, 2001 EA-1321: Final Environmental Assessment Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York December 5, 2001 EA-1391: Final Environmental Assessment Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources September 30, 2001 EA-1383: Final Environmental Assessment Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California

264

Aalborg Universitet Plant-wide Control for Better De-oiling of Produced Water in Offshore Oil & Gas  

E-Print Network (OSTI)

Aalborg Universitet Plant-wide Control for Better De-oiling of Produced Water in Offshore Oil &, B. (2013). Plant-wide Control for Better De-oiling of Produced Water in Offshore Oil & Gas, 2013 #12;Plant-wide Control for Better De-oiling of Produced Water in Offshore Oil & Gas Production

Yang, Zhenyu

265

National Climate Assessment: Indicators System  

NLE Websites -- All DOE Office Websites (Extended Search)

Indicators System Print E-mail Indicators System Print E-mail What are the goals for the NCA indicators? The vision for the National Climate Assessment (NCA) is to create a system of indicators that will help inform policy-makers and citizens understand key aspects of our changing climate. Scientific information about physical climate conditions, climate impacts, vulnerabilities, and preparedness will be tracked and compiled. These measures are called indicators. The goals of the Indicators System are to: Provide meaningful, authoritative climate-relevant measures about the status, rates, and trends of key physical, ecological, and societal variables and values Inform decisions on management, research, and education at regional to national scales Identify climate-related conditions and impacts to help develop effective mitigation and adaptation measures

266

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Area CPM User's Guide Area CPM User's Guide 1. Introduction Field sampling has the potential to be an extremely time-consuming and expensive portion of a radiological site remediation. Collected samples must be shipped to an off-site laboratory or counted in an on-site mobile unit in order to establish areas of contamination and to ensure that acceptable residual levels of contaminants remain. The Area CPM Calculator is a web-based calculator that estimates a gamma detector response for a target level of surface contamination. This calculator provides a rapid, exceptionally cost-effective assessment of contamination and cleanup standards based on field instrument data, which minimizes the use of more expensive sample collection and laboratory analysis. A correction factor for cpm analysis established between this

267

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Frequently Asked Questions Frequently Asked Questions This page represents the most commonly approached topics from our users. What internet browser works best for the RAIS? We attempt to accommodate every browser. If there is a problem viewing the RAIS pages or downloading items, let us know what browser you are using and we will try and fix the problem. How can I use the information on the RAIS? The information on the RAIS can be used for teaching material and performing risk assessments that comply with EPA guidance. Feel free to use the information; it is available to the public. However, please give proper credit to the RAIS and the team from Oak Ridge National Laboratory and The University of Tennessee where you see fit. Also, the databases we maintain are updated on a quarterly basis or sooner, so you may need to "time-stamp"

268

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Glossary of Environmental Restoration Terms Glossary of Environmental Restoration Terms These definitions are from the United States Department of Energy (DOE) Oak Ridge Operations Office (ORO) Environmental Restoration/Waste Management Risk Assessment Program staff and affiliates and the following sources: Click on the letter that begins the term for which you are searching. To search for another term, at the end of each definition, click on the. If a link leaves the glossary to go to an outside page you will see a. A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Abatement: The reduction in degree or intensity of pollution. Absorbed Dose: The energy imparted to a unit mass of matter by ionizing radiation. The unit of absorbed dose is the rad or gray. One rad equals 100 ergs per gram. The amount of a substance absorbed into the body, usually

269

Hanford Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

270

Hydropower Resource Assessment Modeling Results  

DOE Green Energy (OSTI)

The Hydropower Evaluation Software uses the Federal Energy Regulatory Commission?s Hydroelectric Power Resource Assessment database to identify sites with undeveloped hydropower capacity and the estimated megawatts of undeveloped capacity at each site. The software integrates this information with environmental values from the National Park Service?s National Rivers Inventory database. Other constraints to development that are modeled include Federal and state legislative protection for river segments that have been identified as being wild and scenic river segments. River segments containing threatened and/or endangered wildlife and fish are also modeled for their influence on hydropower development. The amount that each attribute affects the likelihood of development is dependent on the prior development of a site.

A. M. Conner; J. E. Francfort

1999-07-06T23:59:59.000Z

271

Uncertainties in risk assessment at USDOE facilities  

Science Conference Proceedings (OSTI)

The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

1994-01-01T23:59:59.000Z

272

Performance Assessment Community of Practice Technical Exchange  

NLE Websites -- All DOE Office Websites (Extended Search)

The Department of Energy is hosting a Technical Exchange at the Hanford Site on The Department of Energy is hosting a Technical Exchange at the Hanford Site on April 13-14, 2010. The Performance Assessment Community of Practice has been chartered to advise the Office of Environmental Management Tank Waste Corporate Board regarding performance assessments and performance assessment-like analyses, promote consistency in the preparation of performance assessments across the Department of Energy (DOE) complex, foster exchange of information among performance assessment practitioners, and develop appropriate guidance for performance assessments such that they are based on sound science and are defensible. The purpose of this technical exchange is to provide a venue for performance assessment and risk assessment practitioners, managers and regulators, and contributors to the Cementitious Barriers Partnership and Advanced Simulation Capability for Environmental Management project to share plans and experiences and share ideas for future performance assessment and risk assessment modeling. The technical exchange will include a combination of plenary presentations and discussions with breakout sessions for specific topics. Discussions will emphasize areas for improved consistency and solicit suggestions for future developments related to modeling tools. A breakout discussion session is also planned to address: DOE Order 435.1 Update, regulatory challenges for performance and risk assessment modeling, and other topical areas. Arrangements have also been made for a GoldSim modeling roundtable at the conclusion of the workshop for participants who are interested in sharing experiences related to the use of GoldSim for their simulations.

273

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 1994 12, 1994 EA-0939: Final Environmental Assessment Blue Creek Winter Range: Wildlife Mitigation Project December 5, 1994 EA-0813: Final Environmental Assessment The Tokamak Fusion Test Reactor Decontamination and Decommissioning Project and the Tokamak Physics Experiment at the Princeton Plasma Physics Laboratory November 15, 1994 EA-1002: Final Environmental Assessment October 27, 1994 EA-0965: Final Environmental Assessment Cancer Research Center Indiana University School of Medicine October 27, 1994 EA-1001: Final Environmental Assessment Commercialization of the Mound Plant October 24, 1994 EA-0952: Final Environmental Assessment The Louisiana State University Waste-to-Energy Incinerator October 20, 1994 EA-0962: Final Environmental Assessment Construction and Routine Operation of a 12-kilovolt Overhead Powerline and

274

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 31, 1996 August 31, 1996 EA-1086: Final Environmental Assessment Amendments to 10 CFR Part 835 (Revised Version - 6/98) August 7, 1996 EA-1160: Final Environmental Assessment Northeast Oregon Wildlife Mitigation Project July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic) July 15, 1996 EA-1149: Final Environmental Assessment Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 1, 1996 EA-1068: Final Programmatic Environmental Assessment State Energy Conservation Program May 21, 1996 EA-1093: Final Environmental Assessment Surface Water Drainage System

275

Oak Ridge Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

276

An Initial Assessment of Hanford Impact Performed with the System Assessment Capability  

SciTech Connect

The System Assessment Capability is an integrated system of computer models and databases to assess the impact of waste remaining at Hanford. This tool will help decision makers and the public evaluate the cumulative effects of contamination from Hanford. This report describes the results of an initial assessment performed with the System Assessment Capability tools.

Bryce, Robert W.; Kincaid, Charles T.; Eslinger, Paul W.; Morasch, Launa F.

2002-09-27T23:59:59.000Z

277

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

278

Fort Drum integrated resource assessment. Volume 3, Resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

279

Creating a culture of assessment: A catalyst for organizational change  

E-Print Network (OSTI)

Culture of Assessment: A Catalyst for Organizational ChangeCulture of Assessment: A Catalyst for Organizational ChangeCulture of Assessment: A Catalyst for Organizational Change

Lakos, Amos; Phipps, Shelley

2004-01-01T23:59:59.000Z

280

EA-1649: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Final Environmental Assessment EA-1649: Final Environmental Assessment Sabine Pass LNG, Export Project This EA assesses the environmental effects of the proposed modifications...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Idaho National Laboratory Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Laboratory Needs Assessment Idaho National Laboratory Needs Assessment October 1998 This Needs Assessment for former Idaho National Laboratory production workers was...

282

EA-1904: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the environmental...

283

EA-0893: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Assessment EA-0893: Final Environmental Assessment Gazes Cardiac Research Institute Medical University of South Carolina This Environmental Assessment...

284

DOE EVMS Risk Assessment Matrix | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EVMS Risk Assessment Matrix DOE EVMS Risk Assessment Matrix DOEEVMSRISKMATRIX.docx More Documents & Publications Earned Value (EV) Analysis and Project Assessment & Reporting...

285

Live Fire Range Environmental Assessment  

SciTech Connect

The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

None

1993-08-01T23:59:59.000Z

286

Assessing Hypothetical Gravity Control Propulsion  

E-Print Network (OSTI)

Gauging the benefits of hypothetical gravity control propulsion is difficult, but addressable. The major challenge is that such breakthroughs are still only notional concepts rather than being specific methods from which performance can be rigorously quantified. A recent assessment by Tajmar and Bertolami used the rocket equation to correct naive misconceptions, but a more fundamental analysis requires the use of energy as the basis for comparison. The energy of a rocket is compared to an idealized space drive for the following cases: Earth-to-orbit, interstellar transit, and levitation. The space drive uses 3.6 times less energy for Earth to orbit. For deep space travel, space drive energy scales as the square of delta-v, while rocket energy scales exponentially. This has the effect of rendering a space drive 150-orders-of-magnitude better than a 17,000-sec Specific Impulse rocket for sending a modest 5000 kg probe to traverse 5 light-years in 50 years. Indefinite levitation, which is impossible for a rocket, could conceivably require 62 MJ/kg for a space drive. Assumption sensitivities and further analysis options are listed to guide further inquires.

Marc G. Millis

2006-03-14T23:59:59.000Z

287

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Radionuclide Decay Chain Radionuclide Decay Chain Using the Radionuclide Decay Chain Tool Click on the steps below for detailed instructions about each page of the Radionuclide Chain Tool. 1. Select Isotope 2. Decay Chain Table 3. Decay Chain Animation 1. Select Isotope Select the isotope of interest and click the "Submit" button. 2. Decay Chain Table A table of the ICRP 107 decay chain appears that displays the parent and all daughters in the decay chain through the stable isotope(s). The half-life, decay modes, and the branching fractions are given. Decay chains that are repeated as a result of multiple branching fractions are only presented once in the table. Text below the decay chain table contains decay mode definitions and further information on the daughters included in the +D slope factors for risk assessment purposes. A back button is provided to return to the main page. To watch an animated representation of the decay process, click the link "Click for visual diagram."

288

Fort Drum integrated resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

289

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 18, 2013 February 18, 2013 EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho February 12, 2013 EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri February 1, 2013 EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho January 17, 2013 EA-1944: Final Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA January 15, 2013 EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the

290

Bioenergy Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

291

Environmental Assessments (EA) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD December 19, 2013 EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky November 15, 2013 EA-1752: Draft Environmental Assessment

292

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

293

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27, 1998 27, 1998 EA-1236: Final Site-Wide Environmental Assessment Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, Wyoming December 1, 1997 EA-1175: Final Environmental Assessment Proposed Title Transfer of East Tennessee Park Land and Facilities November 21, 1997 EA-1170: Final Environmental Assessment Area 5 Radioactive Waste Management Site Access Improvement at the Nevada Test Site October 16, 1997 EA-1219: Final Environmental Assessment Hoe Creek Underground Coal Gasification Test Site Remediation October 8, 1997 EA-1212: Final Environmental Assessment Lease of Land for the Development of a Research Park at Los Alamos National Laboratory July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

294

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit (Redirected from Gateway:International/Economic and Environmental Impacts) Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other

295

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2012 March 1, 2012 EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN February 29, 2012 EA-1884: Draft Environmental Assessment Wray Wind Energy Project, Town of Wray, Yuma County, CO February 29, 2012 EA-1909: Draft Environmental Assessment South Table Wind Project, Kimball County, Nebraska February 13, 2012 EA-1779: Final Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN February 13, 2012 EA-1779: Finding of No Significant Impact and Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN January 25, 2012 EA-1722-SA-001: Supplement Analysis for an Environmental Assessment

296

Resource Assessment and Characterization | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Assessment and Characterization Resource Assessment and Characterization Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the total technically recoverable energy available in the nation's powered dams, non-powered dams, and untapped stream-reaches. These resource assessments are pivotal to understanding hydropower's potential for future electricity production. Hydropower already provides 6-8% of the nation's electricity, but more potential resides in our flowing waters to provide clean electricity to communities and cities across the United States. There are three levels of resource assessments performed by the water industry. Theoretical potential is the annual average amount of physical energy that is hypothetically available. Technical resource potential is

297

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2010 August 2, 2010 EA-1729: Final Environmental Assessment Removal Actions At The Technical Area III Classified Waste Landfill, Sandia National Laboratories, New Mexico July 1, 2010 EA-1743: Final Environmental Assessment Air Products And Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio July 1, 2010 EA-1740: Final Environmental Assessment Thermal Energy Corporation Combined Heat And Power Project, Houston, Texas July 1, 2010 EA-1698: Final Environmental Assessment Baldwin Wind Energy Center July 1, 2010 EA-1696: Final Environmental Assessment Pantex Renewable Energy Project June 25, 2010 EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire June 16, 2010 EA-1741: Draft Environmental Assessment

298

Land Use Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Land Use Assessment Toolkit Land Use Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

299

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2011 June 1, 2011 EA-1848: Final Environmental Assessment Loan Guarantee To Fulcrum Sierra Biofuels, LLC For A Waste-To-Ethanol Facility In Mccarran, Storey County, Nevada June 1, 2011 EA-1858: Final Environmental Assessment Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington June 1, 2011 EA-1875: Final Environmental Assessment Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine May 31, 2011 EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado May 27, 2011 EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine May 17, 2011 EA-1731: Final Environmental Assessment

300

A Resilient Condition Assessment Monitoring System  

SciTech Connect

An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

2012-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Tiger Team assessment of the Pinellas Plant  

Science Conference Proceedings (OSTI)

This Document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Pinellas Plant, Pinellas County, Florida. The assessment wa directed by the Department's Office of Environment, Safety, and Health (ES H) from January 15 to February 2, 1990. The Pinellas Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environment Safety and Health, and Management areas and determines the plant's compliance with applicable Federal (including DOE), State, and local regulations and requirements.

Not Available

1990-05-01T23:59:59.000Z

302

Definitions, Seals - Vulnerability Assessment Team - Nuclear Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Definitions Definitions VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

303

Operations Authorization Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

304

Safety - Vulnerability Assessment Team - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Safety VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

305

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) (Redirected from GCOMAP) Jump to: navigation, search Tool Summary Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

306

EIA-State Energy Data Needs Assessment  

U.S. Energy Information Administration (EIA)

These data could serve missions of Federal energy and transportation agencies by providing a comprehensive data set for assessing energy efficiency and the ...

307

AdaptiVolt(TM) Technology Assessment Report  

Science Conference Proceedings (OSTI)

A technology assessment was conducted for AdaptiVolt and Line Drop Compensation (LDC) technologies for reducing energy consumption and demand by controlling feeder voltage.

2009-03-30T23:59:59.000Z

308

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

309

Useful Resources- Vulnerability Assessment Team - Nuclear Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Selected Publications Selected Publications VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

310

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Project, Ector, Texas August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California...

311

Jefferson City - Property Assessed Clean Energy | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lighting Insulation Other Bioenergy Manufacturing Buying & Making Electricity Solar Wind Program Information Missouri Program Type PACE Financing Property-Assessed Clean Energy...

312

Water Power Program: Resource Assessment and Characterization  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of the United States Ocean Wave Energy Resource This report, created by the Electric Power Research Institute, assesses ocean wave energy potential along the U.S. coasts....

313

Regenerative Burners Assessment in Holding Reverberatory Furnace  

Science Conference Proceedings (OSTI)

The assessment showed that the regenerative burner furnaces are not profitable in saving energy in addition to the negative impact on the furnace life.

314

Demand Response Quick Assessment Tool (DRQAT)  

NLE Websites -- All DOE Office Websites (Extended Search)

Demand Response Quick Assessment Tool (DRQAT) The opportunities for demand reduction and cost saving with building demand responsive control vary tremendously with building type...

315

Environmental Assessment for Conducting Astrophysics and Other...  

NLE Websites -- All DOE Office Websites (Extended Search)

340 Department of Energy Carlsbad Field Office Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site Final January 2001 U.S....

316

Lawrence Livermore National Laborotory Safety Basis Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and implementation of safety basis documentation and execution of the unreviewed safety question (USQ) process. SCOPE The scope of this assessment includes the plans,...

317

Assessment of Preferred Depleted Uranium Disposal Forms  

NLE Websites -- All DOE Office Websites (Extended Search)

. . 7 3.2 PRELIMINARY ASSESSMENT OF DU DISPOSAL AT OTHER SITES . . . . . . . . . . 8 3.3 COSTS OF PRODUCTION, TRANSPORTATION, AND DISPOSAL OF DU WASTE FORMS . . . . . . . . . . ....

318

Evaluation of Electric Field Exposure Assessment Methods  

Science Conference Proceedings (OSTI)

This evaluation of electric field exposure assessment methods highlights a renewed interest in characterizing electric field exposures and their attendant perceptible nuisance shocks.

2008-09-26T23:59:59.000Z

319

Independent Oversight Assessment, Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2012 Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project The U.S. Department of Energy (DOE)...

320

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1997 This Needs Assessment for former Hanford production workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes...

322

Independent Oversight Assessment of Environmental Monitoring...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Environmental Monitoring at the Idaho National Laboratory Site May 2010 Office of Independent Oversight Office of Health, Safety and Security Office of Health, Safety...

323

Seals Applications - Vulnerability Assessment Team - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Physical Security Maxims Read the Security Maxims Devil's Dictionary of Security Terms For more information: Vulnerability Assessment Section Sect. Manager: Roger G....

324

Assessing Climate Change Impacts, Vulnerability and Adaptation...  

Open Energy Info (EERE)

The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan...

325

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010.

326

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations January 1, 2003 EA-1394: Final Environmental Assessment Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear...

327

Independent Oversight Assessment , Idaho National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), performed an assessment of environmental monitoring and surveillance at...

328

Supplemnental Volume - Independent Oversight Assessment of the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant...

329

Seals References - Vulnerability Assessment Team - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure) The (In)Security of Drug Testing VAT in...

330

Plug-In Hybrid Electric Vehicles - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

EPRI and Argonne Assess Commercial Viability of Plug-In Hybrid Electric Vehicles The Electric Power Research Institute (EPRI) and Argonne National Laboratory are engaged in a...

331

Life Cycle Assessment of Wood Pellet.  

E-Print Network (OSTI)

??The primary purpose of this project is to assess the environmental impacts associated with the wood pellet production. The study has extended to the entire… (more)

Chen, Siyu

2009-01-01T23:59:59.000Z

332

Assessment of the Cheng Simplified Combined Cycle  

Science Conference Proceedings (OSTI)

This report will help resource planners assess the cost-effectiveness of retrofitting increased steam injection to a cogeneration plant or power station with gas turbines.

2010-12-17T23:59:59.000Z

333

Environmentally Assisted Cracking Susceptibility Assessment of AP ...  

Science Conference Proceedings (OSTI)

Presentation Title, Environmentally Assisted Cracking Susceptibility Assessment of AP 1000 Reactor Coolant Pump Flywheel Retainer Ring A289 18Cr-18Mn ...

334

PRIVACY IMPACT ASSESSMENT: OCIO HSPD-12 Physical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessments, for requirements and additional guidance for conducting a PIA: http:www.directives.doe.govpdfsdoedoetextlneword206o2061.pdf Please complete electronically:...

335

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York March 1, 2012 EA-1809:...

336

Detailed Renewable Energy Resource Assessment Data Inventory...  

Open Energy Info (EERE)

(national, regional, and site specific). Assessments are available for biomass and hydropower resources at a national level, with only limited information available at the...

337

ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of Building Energy- Saving Policies and Programs in China During the 11th Five Year Plan Nan Zhou, Michael Mcneil and Mark Levine Energy Analysis Department...

338

RADIOLOGICAL ASSESSMENT OF BALLOD AND ASSOCIATES PROPERTY  

Office of Legacy Management (LM)

Cotton, Robert Gosslee, Jonathan Sowell, Clayton Weaver FINAL REPORT July 30, 1981 Work performed by Radiological Site Assessment Program Manpower Education, Research, and...

339

Industrial Energy Efficiency Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

about the Industrial Energy Efficiency Assessments program and its implementation in China. session2industrytrackpriceen.pdf session2industrytrackpricecn.pdf More...

340

Current Projects: GPS Spoofing - Vulnerability Assessment Team...  

NLE Websites -- All DOE Office Websites (Extended Search)

References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure) The...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Technical Report - Cuba Wind Energy Resource Assessment  

Open Energy Info (EERE)

Cuba Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

342

Technical Report - China Wind Energy Resource Assessment  

Open Energy Info (EERE)

China Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

343

Technical Report - Ghana Wind Energy Resource Assessment  

Open Energy Info (EERE)

Ghana Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

344

On environmental lifecycle assessment for policy selection  

E-Print Network (OSTI)

rst and second generation biofuel targets. Energy Policy,Land clearing and the biofuel carbon debt. Science, 319(Life cycle assessment of biofuel greenhouse gas emissions

Rajagopal, Deepak

2010-01-01T23:59:59.000Z

345

Environmental Assessment -- Hydrothermal Geothermal Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment addresses the design, construction, and operation of an electric generating plant (3 to 4 MWe) and research station (Hawaii Geothermal Research Station (HGRS)) in the Puna district on the Island of Hawaii. The facility will include control and support buildings, parking lots, cooling towers, settling and seepage ponds, the generating plant, and a visitors center. Research activities at the facility will evaluate the ability of a successfully flow-tested well (42-day flow test) to provide steam for power generation over an extended period of time (two years). In future expansion, research activities may include direct heat applications such as aquaculture and the effects of geothermal fluids on various plant components and specially designed equipment on test modules. Construction-related impacts would be relatively minor. Construction of the facility will require the distance of about 1.7 ha (4.1 acres). No further disturbance is anticipated, unless it becomes necessary to replace the seepage pond with an injection well, because the production well is in service and adjacent roads and transmission lines are adequate. Disruption of competing land uses will be minimal, and loss of wildlife habitat will be acceptable. Noise should not significantly affect wildlife and local residents; the most noise activities (well drilling and flow testing) have been completed. Water use during construction will not be large, and impacts on competing uses are unlikely. Socio-economic impacts will be small because the project will not employ a large number of local residents and few construction workers will need to find local housing.

None

1979-06-01T23:59:59.000Z

346

Energy and Technolgy Assessment of Zinc and Magnesium Casting Plants, Technical Report Close-out, August 25,2006  

Science Conference Proceedings (OSTI)

Twin City Die Castings Company of Minneapolis, Minnesota, Twin City Die Castings Company was awarded project No. DE-FG36-05GO15097 to perform plant wide assessments of ten (10) die casting facilities that produce zinc and magnesium alloy castings in order to determine improvements and potential cost savings in energy use. Mr. Heider filled the role of team leader for the project and utilized the North American Die Casting Association (NADCA) to conduct audits at team participant plants so as to hold findings specific to each plant proprietary. The intended benefits of the project were to improve energy use through higher operational and process efficiency for the plants assessed. An improvement in energy efficiency of 5 – 15% was targeted. The primary objectives of the project was to: 1) Expand an energy and technology tool developed by the NADCA under a previous DOE project titled, “Energy and Technology Assessment for Die Casting Plants” for assessing aluminum die casting plants to be more specifically applicable to zinc and magnesium die casting facilities. 2) Conduct ten (10) assessments of zinc and magnesium die casting plants, within eight (8) companies, utilizing the assessment tool to identify, evaluate and recommend opportunities to enhance energy efficiency, minimize waste, and improve productivity. 3) Transfer the assessment tool to the die casting industry at large.

Twin City Die Castings Company; Tom Heider; North American Die Castings Association

2006-08-25T23:59:59.000Z

347

NASA BENCHMARKS COMMUNICATIONS Assessment Plan NNSA/Nevada Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Plan NNSANevada Site Office Facility Representative Division NASA BENCHMARKS COMMUNICATIONS Assessment Plan NNSANevada Site Office Facility Representative...

348

EA-1116: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1116: Final Environmental Assessment Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada This EA evaluates the environmental...

349

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

350

EA-1483: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1483: Final Environmental Assessment Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory; East Argonne, Illinois...

351

EA-0429: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington This environmental...

352

Proliferation and Terrorism Risk Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Terrorism Risk Assessment Proliferation and Terrorism Risk Assessment Nuclear Reactor Technologies Fuel Cycle Technologies International Nuclear Energy Policy and...

353

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT Site: Federal or Contractor Program: Name: ____________________________________________ Title:______________________________________________ Organization:_______________________________________ Address: __________________________________________ Bldg and Room Number _____________________________ Phone Number __________________ E-Mail ________________________________ Years of Records Management experience? Length of time in current position? Training? __________________________________________________________________ Signature: Date: 02/03/2010 2 INSTITUTIONALIZATION

354

Seismic Probabilistic Risk Assessment Implementation Guide  

Science Conference Proceedings (OSTI)

BackgroundThis report provides updates to the guidelines and approaches for seismic probabilistic risk assessments (SPRAs) that were published in the initial Electric Power Research Institute (EPRI) report Seismic Probabilistic Risk Assessment Implementation Guide (1002989) in 2003. It provides practical guidelines for SPRA development to support a variety of uses, including risk-informed applications.It is intended that a probabilistic risk ...

2013-12-18T23:59:59.000Z

355

3D Simulations in Environmental Impact Assessment  

Science Conference Proceedings (OSTI)

The increase of petrol cost and the failure of Kyoto agreement generated huge investments in renewable energy sources. In recent times a lot of local authorities allowed wind farm location. In many cases, environmental impact assessments do not take ... Keywords: 3D CAD models, 3D GIS analysis, Multimedia techniques, Viewshed, Visual impact assessment, Wind farm

Maria Danese; Giuseppe Las Casas; Beniamino Murgante

2008-06-01T23:59:59.000Z

356

Space, time and nesting Integrated Assessment Models  

Science Conference Proceedings (OSTI)

Integrated Assessment Modelling in the field of air pollution has advanced greatly since the 1985 Helsinki Protocol on the reduction of Sulphur emissions and their transboundary fluxes. With subsequent protocols and increased understanding of the inter-relationships ... Keywords: CLRTAP, Integrated Assessment Modelling, Scale, Science-policy interaction, Space, Time

T. Oxley; H. M. ApSimon

2007-12-01T23:59:59.000Z

357

Airport risk assessment: a probabilistic approach  

Science Conference Proceedings (OSTI)

Risk reduction is one of the key objectives pursued by transport safety policies. Particularly, the formulation and implementation of transport safety policies needs the systematic assessment of the risks, the specification of residual risk targets and ... Keywords: risk assessment methodology, risk management, safety civil aviation

L. Guerra; T. Murino; E. Romano

2008-05-01T23:59:59.000Z

358

Self-Assessment Program Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SELF-ASSESSMENT SELF-ASSESSMENT Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: Management should ensure that effective management and independent self- assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect people and

359

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network (OSTI)

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

360

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies  

DOE Green Energy (OSTI)

This survey of biomass resource assessments and assessment capabilities in Asia-Pacific Economic Cooperation (APEC) economies considered various sources: academic and government publications, media reports, and personal communication with contacts in member economies.

Milbrandt, A.; Overend, R. P

2008-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Uncertainty in Integrated Assessment Scenarios  

SciTech Connect

The determination of climate policy is a decision under uncertainty. The uncertainty in future climate change impacts is large, as is the uncertainty in the costs of potential policies. Rational and economically efficient policy choices will therefore seek to balance the expected marginal costs with the expected marginal benefits. This approach requires that the risks of future climate change be assessed. The decision process need not be formal or quantitative for descriptions of the risks to be useful. Whatever the decision procedure, a useful starting point is to have as accurate a description of climate risks as possible. Given the goal of describing uncertainty in future climate change, we need to characterize the uncertainty in the main causes of uncertainty in climate impacts. One of the major drivers of uncertainty in future climate change is the uncertainty in future emissions, both of greenhouse gases and other radiatively important species such as sulfur dioxide. In turn, the drivers of uncertainty in emissions are uncertainties in the determinants of the rate of economic growth and in the technologies of production and how those technologies will change over time. This project uses historical experience and observations from a large number of countries to construct statistical descriptions of variability and correlation in labor productivity growth and in AEEI. The observed variability then provides a basis for constructing probability distributions for these drivers. The variance of uncertainty in growth rates can be further modified by expert judgment if it is believed that future variability will differ from the past. But often, expert judgment is more readily applied to projected median or expected paths through time. Analysis of past variance and covariance provides initial assumptions about future uncertainty for quantities that are less intuitive and difficult for experts to estimate, and these variances can be normalized and then applied to mean trends from a model for uncertainty projections. The probability distributions of these critical model drivers, and the resulting uncertainty in projections from a range of models, can provide the basis of future emission scenario set designs.

Mort Webster

2005-10-17T23:59:59.000Z

362

Small Modular Reactors: Institutional Assessment  

SciTech Connect

? Objectives include, among others, a description of the basic development status of “small modular reactors” (SMRs) focused primarily on domestic activity; investigation of the domestic market appeal of modular reactors from the viewpoints of both key energy sector customers and also key stakeholders in the financial community; and consideration of how to proceed further with a pro-active "core group" of stakeholders substantially interested in modular nuclear deployment in order to provide the basis to expedite design/construction activity and regulatory approval. ? Information gathering was via available resources, both published and personal communications with key individual stakeholders; published information is limited to that already in public domain (no confidentiality); viewpoints from interviews are incorporated within. Discussions at both government-hosted and private-hosted SMR meetings are reflected herein. INL itself maintains a neutral view on all issues described. Note: as per prior discussion between INL and CAP, individual and highly knowledgeable senior-level stakeholders provided the bulk of insights herein, and the results of those interviews are the main source of the observations of this report. ? Attachment A is the list of individual stakeholders consulted to date, including some who provided significant earlier assessments of SMR institutional feasibility. ? Attachments B, C, and D are included to provide substantial context on the international status of SMR development; they are not intended to be comprehensive and are individualized due to the separate nature of the source materials. Attachment E is a summary of the DOE requirements for winning teams regarding the current SMR solicitation. Attachment F deserves separate consideration due to the relative maturity of the SMART SMR program underway in Korea. Attachment G provides illustrative SMR design features and is intended for background. Attachment H is included for overview purposes and is a sampling of advanced SMR concepts, which will be considered as part of the current DOE SMR program but whose estimated deployment time is beyond CAP’s current investment time horizon. Attachment I is the public DOE statement describing the present approach of their SMR Program.

Joseph Perkowski, Ph.D.

2012-06-01T23:59:59.000Z

363

Argonne National Laboratory Launches Bioenergy Assessment Tools |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools September 30, 2013 - 4:00pm Addthis A researcher loads a biomass sample into spinning ring cup. Argonne National Laboratory has launched two online tools that assess the resource consumption and greenhouse gas emissions associated with biofuel production. | Photo courtesy of National Renewable Energy Laboratory A researcher loads a biomass sample into spinning ring cup. Argonne National Laboratory has launched two online tools that assess the resource consumption and greenhouse gas emissions associated with biofuel production. | Photo courtesy of National Renewable Energy Laboratory Paul Lester Communications Specialist for the Office of Energy Efficiency and Renewable

364

UNFCCC-Mitigation Assessments | Open Energy Information  

Open Energy Info (EERE)

UNFCCC-Mitigation Assessments UNFCCC-Mitigation Assessments Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Mitigation Assessments Agency/Company /Organization: United Nations Framework Convention on Climate Change Sector: Energy, Land Topics: Pathways analysis Resource Type: Presentation, Training materials Website: unfccc.int/resource/cd_roms/na1/mitigation/index.htm UNFCCC-Mitigation Assessments Screenshot References: UNFCCC-Mitigation Assessments[1] "This training package (containing PowerPoint presentations and notes, a handbook and reference materials) is designed to facilitate the preparation of the mitigation component of the national communications by non-Annex I teams based on UNFCCC guidelines contained in the annex to decision 17/CP.8." References

365

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2010 April 1, 2010 EA-1718: Final Environmental Assessment EnerG2, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Albany, OR April 1, 2010 EA-1658: Final Environmental Assessment Proposed Development and Demonstration of a Biomass EnergyCenter for Food Processing Applications, Topeka, Kansas April 1, 2010 EA 1713: Final Environmental Assessment Celgard LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Concord, North Carolina March 16, 2010 EA-1758: Final Environmental Assessment Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells March 1, 2010 EA-1748: Final Environmental Assessment Energy Conservation Standards for Small Electric Motors March 1, 2010

366

Technology Readiness Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management » Tank Waste and Waste Processing » Waste Management » Tank Waste and Waste Processing » Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download January 1, 2012 Compilation of TRA Summaries A compilation of all TRA Summaries November 1, 2011 Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download November 1, 2009 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download

367

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 2010 October 1, 2010 EA-1810: Final Environmental Assessment San Emidio Geothermal Exploration Project October 1, 2010 EA-1656: Final Environmental Assessment MARET Center at Crowder College October 1, 2010 EA-1789: Final Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Alpena Prototype Biorefinery, Alpena, Michigan October 1, 2010 EA-1750: Draft Environmental Assessment Smart Grid, Center for Commercialization of Electric Technology, Technology Solutions for Wind Integration in ERCOT, Houston, Texas October 1, 2010 EA-1778: Draft Environmental Assessment Proposed Rule, 10 CFR Part 433: Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise

368

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2003 21, 2003 EA-1446: Final Environmental Assessment Test Capabilities Revitalization at Sandia National Laboratories/New Mexico, Department of Energy, Office of Kirtland Site Operations January 1, 2003 EA-1394: Final Environmental Assessment Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear Superheat (BONUS) Reactor Building, Ricon, Puerto Rico December 11, 2002 EA-1430: Final Environmental Assessment Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico December 2, 2002 EA-1426: Final Environmental Assessment Linac Coherent Light Source Experimental Facility December 2, 2002 EA-1442: Final Environmental Assessment Proposed Construction and Operation of a Biosafety Level 3 Facility at

369

EIS-0120: Wetland Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0120: Wetland Assessment EIS-0120: Wetland Assessment EIS-0120: Wetland Assessment F- and H-Area Groundwater Remediation Project at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina The U.S. Department of Energy (DOE) has prepared this wetland assessment in compliance with DOE requirements (10 CFR Part 1022) for the floodplain and wetland environmental review of the proposed F- and H-Area Groundwater Remediation Project at the Savannah River Site (SRS), located near Aiken, South Carolina (Figure 1-1). DOE is proposing to install underground barrier wall/base injection systems to replace the pump/treat/reinjection systems previously used to remediate the contaminated groundwater associated with the closed F- and H-Area Seepage Basins at SRS. EIS-0120; Final Environmental Impact Statement, Wetland Assessment for the

370

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2007 November 1, 2007 EA-1463: Final Environmental Assessment 10 CFR 433: Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR 435: Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings November 1, 2007 EA-1595: Final Environmental Assessment Davis-Mead 230-kV Transmission Line Reconductor Project October 1, 2007 EA-1597: Final Environmental Assessment Construction and Operation of a Proposed Ethanol Cellulosic Ethanol Plant, Range Fuels, Inc. August 1, 2007 EA-1593: Final Environmental Assessment Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject July 2, 2007 EA-1573: Final Environmental Assessment Three Site Development Projects at the National Renewable Energy Laboratory

371

NREL: Energy Analysis - Life Cycle Assessment Harmonization  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Cycle Assessment Harmonization Life Cycle Assessment Harmonization Life Cycle Greenhouse Gas Emissions from Electricity Generation (Fact Sheet) Cover of the Life Cycle Greenhouse Gas Emissions from Electricity Generation factsheet Download the Fact Sheet The U.S. Department of Energy enlisted NREL to review and "harmonize" life cycle assessments (LCA) of electricity generation technologies. Hundreds of assessments have been published, often with considerable variability in results. These variations in approach, while usually legitimate, hamper comparison across studies and pooling of published results. Learn more about life cycle assessments of energy technologies. By harmonizing this data, NREL seeks to reduce the uncertainty around estimates for environmental impacts of renewables and increase the value of

372

EIS-0120: Wetland Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

120: Wetland Assessment 120: Wetland Assessment EIS-0120: Wetland Assessment F- and H-Area Groundwater Remediation Project at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina The U.S. Department of Energy (DOE) has prepared this wetland assessment in compliance with DOE requirements (10 CFR Part 1022) for the floodplain and wetland environmental review of the proposed F- and H-Area Groundwater Remediation Project at the Savannah River Site (SRS), located near Aiken, South Carolina (Figure 1-1). DOE is proposing to install underground barrier wall/base injection systems to replace the pump/treat/reinjection systems previously used to remediate the contaminated groundwater associated with the closed F- and H-Area Seepage Basins at SRS. EIS-0120; Final Environmental Impact Statement, Wetland Assessment for the

373

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2000 9, 2000 EA-1310: Final Environmental Assessment Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory March 9, 2000 EA-1247: Final Environmental Assessment Electrical Power System Upgrades at Los Alamos National Laboratory March 1, 2000 EA-1300: Final Environmental Assessment Nevada Test Site Development Corporation's Desert Rock Sky Park at the Nevada Test Site February 16, 2000 EA-1332: Final Environmental Assessment Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory September 1, 1999 EA-1312: Final Environmental Assessment Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax

374

Guideline for Assessing Maintenance Effectiveness: A Self-Assessment Guideline for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The EPRI Technologies for Equipment Assessment and Maintenance (TEAM) group has prepared this guideline to assist EPRI-member nuclear power plants in further improving their maintenance processes by presenting, in detail, a collection of the key elements and activities that contribute to a well-organized maintenance program. An honest assessment of these activities then provides tools that can be used to perform a self-assessment of an existing maintenance program. This assessment is directed toward how ...

2002-12-10T23:59:59.000Z

375

Nuclear Nonproliferation Ontology Assessment Team Final Report  

SciTech Connect

Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

Strasburg, Jana D.; Hohimer, Ryan E.

2012-01-01T23:59:59.000Z

376

Nuclear Nonproliferation Ontology Assessment Team Final Report  

SciTech Connect

Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

Strasburg, Jana D.; Hohimer, Ryan E.

2012-01-01T23:59:59.000Z

377

SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools  

E-Print Network (OSTI)

to a maximum of about 2,000 ft (610 m) in much of northern Washington and 3,500 ft (1,067 m) in central OregonSOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools #12;SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT A-1 Interactive

378

DRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools  

E-Print Network (OSTI)

Washington and 3,500 ft (1,067 m) in central Oregon. Soils and geology are very diverse. Topography rangesDRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools #12;DRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT A-1

379

Defining assessment projects and scenarios for policy support: Use of ontology in Integrated Assessment and Modelling  

Science Conference Proceedings (OSTI)

Integrated Assessment and Modelling (IAM) provides an interdisciplinary approach to support ex-ante decision-making by combining quantitative models representing different systems and scales into a framework for integrated assessment. Scenarios in IAM ... Keywords: Collaborative approach, Integration, Knowledge management, Multi-disciplinary teams, Policy assessment

S. Janssen; F. Ewert; Hongtao Li; I. N. Athanasiadis; J. J. F. Wien; O. Thérond; M. J. R. Knapen; I. Bezlepkina; J. Alkan-Olsson; A. E. Rizzoli; H. Belhouchette; M. Svensson; M. K. van Ittersum

2009-12-01T23:59:59.000Z

380

Post-Retrofit Residential Assessments  

SciTech Connect

This study examined a range of factors influencing energy consumption in households that had participated in residential energy-efficiency upgrades. The study was funded by a grant from the U.S. Department of Energy’s Pacific Northwest National Laboratory and was conducted by faculty and staff of Portland State University Center for Urban Studies and Department of Economics. This work was made possible through the assistance and support of the Energy Trust of Oregon (ETO), whose residential energy-efficiency programs provided the population from which the sample cases were drawn. All households in the study had participated in the ETO Home Performance with Energy Star (HPwES) program. A number of these had concurrently pursued measures through other ETO programs. Post-retrofit energy outcomes are rarely investigated on a house-by-house basis. Rather, aggregate changes are ordinarily the focus of program impact evaluations, with deviation from aggregate expectations chalked up to measurement error, the vagaries of weather and idiosyncrasies of occupants. However, understanding how homes perform post-retrofit on an individual basis can give important insights to increase energy savings at the participant and the programmatic level. Taking a more disaggregated approach, this study analyzed energy consumption data from before and after the retrofit activity and made comparisons with engineering estimates for the upgrades, to identify households that performed differently from what may have been expected based on the estimates. A statistical analysis using hierarchal linear models, which accounted for weather variations, was performed looking separately at gas and electrical use during the periods before and after upgrades took place. A more straightforward comparison of billing data for 12-month periods before and after the intervention was also performed, yielding the majority of the cases examined. The later approach allowed total energy use and costs to be assessed but did not account for weather variation. From this statistical analysis, 18 study participants were selected and interviewed. The participants completed an in-home interview covering a range of topics, including changes in occupancy and additional changes to the homes that may have affected energy use. The goal of the interviews was to identify factors that may have contributed to unusual energy performance. These factors were identified by their frequency of occurrence in outperforming or underperforming homes, or simply by identifying factors that had the largest impact on overall savings. The motivations and levels of satisfaction with the outcomes of the upgrades were covered in detail, as well as extensive discussions of behaviors pertaining to thermal control, lighting, water, and appliance use. Most of cases studied achieved substantial energy savings, although it was more common for the projected savings to be greater than the demonstrated savings. Two factors that played a very large role in savings variation were 1) changes in occupancy and 2) fenestration improvements outside of the incentive programs. Motivation for pursuing the upgrades (e.g., environmental sustainability vs. comfort or cost savings) did not seem to play any role in achieving savings. Participants generally were more concerned with maintaining aesthetics through lighting than comfort through heating or cooling. They also seemed more likely to turn the lights off when leaving a room than to turn the heat off when leaving the home.

Lancaster, Ross; lutzenhiser, Loren; Moezzi, Mithra; Widder, Sarah H.; Chandra, Subrato; Baechler, Michael C.

2012-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

University of Miami Industrial Assessment Center  

Science Conference Proceedings (OSTI)

This report documents all activity of the University of Miami Industrial Assessment Center (MIIAC) grant awarded by the United States Department of Energy (USDOE) Office of Energy Efficiency and Renewable Energy (EERE) Industrial Technology Program (ITP). This grant was coordinated through a collaborative effort with the Center for Advanced Energy Systems (CAES) located at Rutgers University in New Jersey (www.caes.rutgers.edu) which acted as the program’s Field Manager. The grant’s duration included fiscal years 2003-2006 (September 2002 – August 2006), and operated under the direction of Dr. Shihab Asfour, Director (MIIAC). MIIAC’s main goal was to provide energy assessments for local manufacturing firms. Energy consumption, productivity enhancement, and waste management were the focus of each assessment. Energy savings, cost savings, implementation costs, and simple payback periods were quantified using scientific methodologies and techniques. Over the four-year period of the grant, the total number of industrial assessments conducted was 91, resulting in 604 assessment recommendations and the following savings: 73,519,747 kWh, 435,722 MMBTU, and $10,024,453 in cost savings. A total of 16 undergraduate and graduate students were trained on energy assessment. Companies in over 40 different zip codes were assessed.

Asfour, Shihab, S.

2007-01-29T23:59:59.000Z

382

Environmental Assessment Kotzebue Wind Installation Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

383

NREL: Energy Analysis: Life Cycle Assessment Harmonization  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Cycle Assessment Harmonization Life Cycle Assessment Harmonization Life cycle assessment (LCA) harmonization helps lenders, utility executives, and lawmakers get the best, most precise information on greenhouse gas emissions from various sources of energy. LCA has been used to estimate and compare GHG emissions from utility-scale power systems for three decades, often with considerable variability in results. Harmonization provides more exact estimates of greenhouse-gas emissions for renewable and conventional electricity generation technologies, clarifying inconsistent and conflicting estimates in the published literature and reducing uncertainty. Highlights of Recent Studies Chart that compares published and harmonized lifecycle greenhouse gas emissions. For help reading this chart, please contact the webmaster.

384

Marginal Lands: Concept, Assessment and Management  

SciTech Connect

Marginal lands have received wide attention for their potential to improve food security and support bioenergy production. However, environmental, ecosystem service, and sustainability concerns have been widely raised over the use of marginal land. Knowledge of the extent, location, and quality of marginal lands as well as their assessment and management are limited and diverse. This paper provides a review of the historical development of marginal concept, its application and assessment. Limitations and priority research needs of marginal land assessment and management were discussed.

Kang, Shujiang [ORNL; Post, Wilfred M [ORNL; West, Tristram O. [Joint Global Change Research Institute, PNNL; Bandaru, Vara Prasad [ORNL; Izaurralde, Dr. R. Cesar [Pacific Northwest National Laboratory (PNNL); Wang, Dali [ORNL; Nichols, Dr Jeff A [ORNL

2013-01-01T23:59:59.000Z

385

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

386

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

387

Plant-Wide Integrated Environment Distributed on Workstations (Plant-Window) System Functional Requirements  

Science Conference Proceedings (OSTI)

EPRI's Plant-Wide Integrated Environment Distributed on Workstations (Plant-Window) supports the activities of plant staff by providing a common, consistent, easy-to-use interface to distributed data sources, information systems, and instrumentation and control systems. This report guides utilities in the design and development of a flexible, expandable computing architecture to integrate access and functionality in upgraded plant systems. Such an architecture will increase productivity by eliminating ro...

1996-08-31T23:59:59.000Z

388

Instrumentation and Control Strategies for Plant-Wide and Fleet-Wide Cost Reduction  

Science Conference Proceedings (OSTI)

A more recent product is now available that contains this report, along with additional presentation materials to facilitate its use. See Product 1018109. This report provides guidance arising from the EPRI initiative on IC Strategies for Plant-Wide and Fleet-Wide Cost Reduction. The document describes a wide range of options while emphasizing integrated modernization across the plant or fleet. Coordinated improvements to shared communications and computing infrastructure, plant processes, and organizat...

2007-10-29T23:59:59.000Z

389

Australia - Energy Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Australia - Energy Resource Assessment Australia - Energy Resource Assessment Jump to: navigation, search Name Australia - Energy Resource Assessment Agency/Company /Organization Australian Government Sector Energy Focus Area Conventional Energy, Energy Efficiency, Renewable Energy Topics Resource assessment Resource Type Publications Website https://www.ga.gov.au/image_ca Country Australia UN Region South-Eastern Asia, "Pacific" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

390

Final Workshop of Department's Inaugural Technology Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment July 12, 2011 - 12:01pm Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs This Wednesday, Under Secretary Steven Koonin will host the sixth and final workshop of the Department's inaugural Quadrennial Technology Review. The aim of the comprehensive assessment is to strengthen and streamline how the Department achieves its energy, economic and environmental goals over the next five year. You can watch live starting at 8:30 AM ET. Secretary Chu is scheduled to speak at approximately 12:45 PM and the event is set to run until 5 PM. Before and during the event, you can tweet questions and have them answered

391

ASSESSMENT OF SRSO TRAINING & QUALIFICATION PROGRAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ASSESSMENT OF SRSO TRAINING & QUALIFICATION PROGRAM ASSESSMENT OF SRSO TRAINING & QUALIFICATION PROGRAM This self assessment evaluates the effective implementation of the Technical Qualification Programs (TQP). The Federal Technical Capability Panel (FTCP) also reviews the results of the TQP self- assessments and determines if further action is necessary on a Departmental level. Federal Technical Capability: LOIs a. FTC-1. Executive Commitment and Line Management Ownership. Line management is actively involved in all aspects of technical employee recruitment, retention, development, and deployment. 1.1 Line managers are aware of the requirements and administrative flexibilities associated with recruiting, hiring, and retaining high-quality technical employees. 1.2 Senior line management supports the continuous technical

392

EA-1458: Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

458: Environmental Assessment 458: Environmental Assessment EA-1458: Environmental Assessment Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites, DOE Grand Junction Office, Grand Junction, Colorado The U.S. Department of Energy (DOE) is proposing ground water compliance strategies for two former uranium-ore processing sites at Slick Rock, Colorado. The purpose of the UMTRA Ground Water Project is to protect human health and the environment at abandoned uranium-ore processing sites by complying with the EPA ground water standards in 40 CFR 192 Subpart B. DOE proposes to implement the compliance strategy outlined in the SOWP (DOE 2002b), which uses the framework established in the PEIS (DOE 1996). DOE/EA-1458; Final Environmental Assessment of Ground Water Compliance at

393

National Climate Assessment: Available Technical Inputs  

NLE Websites -- All DOE Office Websites (Extended Search)

Available Technical Inputs Print E-mail Available Technical Inputs Print E-mail Technical inputs for the 2013 National Climate Assessment were due March 1, 2012. Please note that these reports were submitted independently to the National Climate Assessment for consideration and have not been reviewed by the National Climate Assessment Development and Advisory Committee. Links to agency-sponsored reports will be posted here as they are made available. Sectors National Climate Assessment Health Sector Literature Review and Bibliography. Technical Input for the Interagency Climate Change and Human Health Group, September 2012. Overview Bibliography Bibliography User's Guide Search Strategy and Results Walthall et al. 2012. Climate Change and Agriculture in the United States: Effects and Adaptation. USDA Technical Bulletin 1935. Washington, DC. 186 pages. | Report FAQs

394

Election Security - Vulnerability Assessment Team - Nuclear Engineerin...  

NLE Websites -- All DOE Office Websites (Extended Search)

on LinkedIn The Vulnerability Assessment Team has demonstrated easy to execute, non-cyber attacks on two different kinds of electronic voting machines. We believe that too...

395

Assessing Forecast Skill through Cross Validation  

Science Conference Proceedings (OSTI)

This study explains the method of cross validation for assessing forecast skill of empirical prediction models. Cross validation provides a relatively accurate measure of an empirical procedure's ability to produce a useful prediction rule from a ...

J. B. Elsner; C. P. Schmertmann

1994-12-01T23:59:59.000Z

396

Incorporating Misclassification Error in Skill Assessment  

Science Conference Proceedings (OSTI)

It is desirable to account for misclassification error of meteorological observations so that the true skill of the forecast can be assessed. Errors in observations can occur, among other places, in pilot reports of icing and in tornado spotting. ...

William Briggs; Matt Pocernich; David Ruppert

2005-11-01T23:59:59.000Z

397

Final Workshop of Department's Inaugural Technology Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment July 12, 2011 - 12:01pm Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs This Wednesday, Under Secretary Steven Koonin will host the sixth and final workshop of the Department's inaugural Quadrennial Technology Review. The aim of the comprehensive assessment is to strengthen and streamline how the Department achieves its energy, economic and environmental goals over the next five year. You can watch live starting at 8:30 AM ET. Secretary Chu is scheduled to speak at approximately 12:45 PM and the event is set to run until 5 PM. Before and during the event, you can tweet questions and have them answered

398

Exposure Assessment for Bioaerosols in Health Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Exposure Assessment for Bioaerosols in Health Studies Exposure Assessment for Bioaerosols in Health Studies Speaker(s): Carol Rao Date: July 9, 2004 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Mark Mendell Exposures to fungi have been linked with asthma, toxicoses, hypersensitivity pneumonitis, and a range of non-specific symptoms. Definitive associations between indoor fungal exposure and health effects in population-based exposure-response studies, however, have not been well established. Issues in exposure assessment methods, both in collection and analysis, are major limitations. Classic methods for assessing airborne fungi rely upon collecting and analyzing whole fungal spores by culture. However, quantifying whole fungal spores may not fully describe fungal exposures, especially for purposes of investigating adverse respiratory

399

Environmental Assessment Fact Sheet - Public Participation  

NLE Websites -- All DOE Office Websites (Extended Search)

invites public comment on the draft invites public comment on the draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. This document examines potential environmental consequences of conducting scientific experiments at the Waste Isolation Pilot Plant (WIPP). To facilitate public understanding of the proposed experiments and of the DOE's findings in the environmental assessment, the Carlsbad Field Office has scheduled two public meetings in New Mexico, one in Santa Fe and the other in Carlsbad. While the National Environmental Policy Act does not require a public meeting for an environmental assessment, it is encouraged. Dates, times, and locations are below. The DOE is holding a 30-day comment period on the environmental assessment,

400

First National Climate Assessment: Background and Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Background and Process Print E-mail Workshops of the First National Climate Assessment In February 1997, the U.S. Global Change Research Program and the Office of Science and...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Second National Climate Assessment: Key Findings  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt An affiliated website was created specifically for the 2009 National Climate Assessment so that the report would be more accessible to a variety of interested...

402

ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS  

E-Print Network (OSTI)

help California energy and policy analysts better assess end use detail  allows energy and policy analysts to better which would allow energy and policy analysts to better 

Masanet, Eric

2010-01-01T23:59:59.000Z

403

Y-12 National Security Complex Water Assessment  

Science Conference Proceedings (OSTI)

The Department of Energy's Federal Energy Management Program (FEMP) sponsored a water assessment at the Y-12 National Security Complex (Y 12) located in Oak Ridge, Tennessee. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment is to develop a comprehensive understanding of the current water-consuming applications and equipment at Y-12 and to identify key areas for water efficiency improvements that could be applied not only at Y-12 but at other Federal facilities as well. FEMP selected Pacific Northwest National Laboratory to coordinate and manage the water assessment. PNNL contracted Water Savers, LLC to lead the technical aspects of the water assessment. Water Savers provided key technical expertise in water auditing, metering, and cooling systems. This is the report of that effort, which concluded that the Y-12 facility could realize considerable water savings by implementing the recommended water efficiency opportunities.

Elam, Shana E.; Bassett, P.; McMordie-Stoughton, Katherine L.

2010-11-01T23:59:59.000Z

404

Software demonstration: Demand Response Quick Assessment Tool  

NLE Websites -- All DOE Office Websites (Extended Search)

Software demonstration: Demand Response Quick Assessment Tool Speaker(s): Peng Xu Date: February 4, 2008 - 12:00pm Location: 90-3122 The potential for utilizing building thermal...

405

Understanding the system in risk assessment  

Science Conference Proceedings (OSTI)

In the assessment of a system, understanding the system is central. Even so, most of the current literature takes a narrow view of understanding, making only the catalog of system ``assets`` explicit, while maintaining the balance of the analyst`s understanding inside the analyst`s head. This can lead to problems with non-repeatability and incompleteness of assessment results. This paper introduces the notion of using explicit system models to document the analyst`s understanding of the system and shows that, from these models, standard assessment products, such as fault trees and event trees, can be automatically derived. This paper also presents five ``views`` of a system that can be used to document the analyst`s understanding of the system. These views go well beyond the standard instruction to identify the system`s assets to show that a much richer understanding of the system can be required for effective assessment.

Craft, R.; Vandewart, R.; Wyss, G.; Funkhouser, D.

1998-02-01T23:59:59.000Z

406

Needs for Robotic Assessments of Nuclear Disasters  

SciTech Connect

Following the nuclear disaster at the Fukushima nuclear reactor plant in Japan, the need for systems which can assist in dynamic high-radiation environments such as nuclear incidents has become more apparent. The INL participated in delivering robotic technologies to Japan and has identified key components which are needed for success and obstacles to their deployment. In addition, we are proposing new work and methods to improve assessments and reactions to such events in the future. Robotics needs in disaster situations include phases such as: Assessment, Remediation, and Recovery Our particular interest is in the initial assessment activities. In assessment we need collection of environmental parameters, determination of conditions, and physical sample collection. Each phase would require key tools and efforts to develop. This includes study of necessary sensors and their deployment methods, the effects of radiation on sensors and deployment, and the development of training and execution systems.

Victor Walker; Derek Wadsworth

2012-06-01T23:59:59.000Z

407

Assessment of Voltage Security Methods and Tools  

Science Conference Proceedings (OSTI)

To ensure voltage-secure operation of a power system, VAR control devices must be optimally placed and operated. This project assessed tools and methods that claim to help utilities meet these needs and recommended specific enhancements to these tools.

1995-10-26T23:59:59.000Z

408

First National Climate Assessment: Production Team  

NLE Websites -- All DOE Office Websites (Extended Search)

forest ecosystems. He was a covening lead author on the 1990 and 1995 IPCC assessments of climate change. He has served as a vice-chair of the International Geosphere-Biosphere...

409

Seismic assessment strategies for masonry structures  

E-Print Network (OSTI)

Masonry structures are vulnerable to earthquakes, but their seismic assessment remains a challenge. This dissertation develops and improves several strategies to better understand the behavior of masonry structures under ...

DeJong, Matthew J. (Matthew Justin)

2009-01-01T23:59:59.000Z

410

Second National Climate Assessment: Companion Materials  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Groups Budget Strategic Plan Related Federal Climate Efforts What We Do Study Climate & Global Change Prepare The Nation For Change Assess the U.S. Climate Make Our...

411

Second National Climate Assessment: Production Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Groups Budget Strategic Plan Related Federal Climate Efforts What We Do Study Climate & Global Change Prepare The Nation For Change Assess the U.S. Climate Make Our...

412

Technical Assessment: Cryo-Compressed Hydrogen Storage  

E-Print Network (OSTI)

Technical Assessment: Cryo-Compressed Hydrogen Storage for Vehicular Applications October 30, 2006* U.S. Department of Energy Hydrogen Program *Revised June, 2008 #12;Table of Contents Introduction .....................................................................................................................................................................8 APPENDIX A: Review of Cryo-Compressed Hydrogen Storage Systems

413

Techno-Economics & Life Cycle Assessment (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of the techno-economic analysis (TEA) and life cycle assessment (LCA) capabilities at the National Renewable Energy Laboratory (NREL) and describes the value of working with NREL on TEA and LCA.

Dutta, A.; Davis, R.

2011-12-01T23:59:59.000Z

414

Assessment of rainwater harvesting in Northern Ghana  

E-Print Network (OSTI)

This study assesses the current state of rainwater harvesting in the Northern Region of Ghana and makes recommendations regarding if and how rainwater harvesting could be used to address Pure Home Water's goal of reaching ...

Barnes, David Allen

2009-01-01T23:59:59.000Z

415

Assessment of Magtube Power Ring Flywheel Technology  

Science Conference Proceedings (OSTI)

This report provides an assessment of a novel flywheel technology being developed by Magtube Inc. as a concept that is potentially scalable to MW ratings and MWh storage capabilities.

2004-01-22T23:59:59.000Z

416

Commercial Motor Vehicle Brake Assessment Tools  

E-Print Network (OSTI)

Commercial Motor Vehicle Brake Assessment Tools Commercial Motor Vehicle Roadside Technology Corridor Safety Technology Showcase October 14, 2010 Commercial Motor Vehicle Roadside Technology Corridor #12;Overview · Commercial Motor Vehicle (CMV) Air Brake System · North American Standard Level-1

417

Assessing Energy Use in Your Plant  

SciTech Connect

This DOE Industrial Technologies Program fact sheet describes ITP resources and software that industrial plants can use for energy assessments that result in greater energy efficiency and lower costs.

2006-02-01T23:59:59.000Z

418

Environmental Assessment (Newfoundland and Labrador, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Environmental Protection Act states that the purpose of environmental assessment is to "protect the environment and quality of life of the people of the province; and facilitate the wise...

419

Environmental Impact Assessment (Prince Edward Island, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

The Province of PEI has established an environmental impact assessment process for projects that could have an impact on the environment. The Province and the Federal Government cooperate in the...

420

Assessing the Ensemble Spread-Error Relationship  

Science Conference Proceedings (OSTI)

The potential ability of an ensemble prediction system (EPS) to represent its own varying forecast error provides strong motivation to produce an EPS over a less expensive deterministic forecast. Traditionally this ability has been assessed by ...

T. M. Hopson

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Australian Shale Gas Assessment Project Reza Rezaee  

E-Print Network (OSTI)

Australian Shale Gas Assessment Project Reza Rezaee Unconventional Gas Research Group, Department of Petroleum Engineering, Curtin University, Australia Shale gas is becoming an important source feet (Tcf) of technically recoverable shale gas resources. Western Australia (WA) alone

422

Injury assessment for physics-based characters  

Science Conference Proceedings (OSTI)

Determining injury levels for virtual characters is an important aspect of many games. For characters that are animated using simulated physics, it is possible assess injury levels based on physical properties, such as accelerations and forces. We have ...

Thomas Geijtenbeek; Diana Vasilescu; Arjan Egges

2011-11-01T23:59:59.000Z

423

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

424

2012 EPRI Fossil Life Assessment Conference Proceedings  

Science Conference Proceedings (OSTI)

The International Conference on Advances in Condition and Remaining Life Assessment for Fossil Power plants – Coal, Gas and HRSG was hosted in October 2012 in Hilton Head, SC, USA.  This conference was the latest of a series of conferences addressing aging equipment in Fossil Power Plants dating back to the early 1980’s.  Condition and remaining life assessment (historically referred to as CARLA) technology has assumed great importance in the context of the reliability, ...

2013-12-23T23:59:59.000Z

425

Integrated regional assessment: qualitative and quantitative issues  

Science Conference Proceedings (OSTI)

Qualitative and quantitative issues are particularly significant in integrated regional assessment. This chapter examines the terms “qualitative” and “quantitative” separately and in relation to one another, along with a discussion of the degree of interdependence or overlap between the two. Strategies for integrating the two general approaches often produce uneasy compromises. However, integrated regional assessment provides opportunities for strong collaborations in addressing specific problems in specific places.

Malone, Elizabeth L.

2009-11-19T23:59:59.000Z

426

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

427

Turbine Condition Assessment and Monitoring Methodology  

Science Conference Proceedings (OSTI)

This report provides a broad overview of the process of steam turbine condition assessment and on-line monitoring (OLM). Describing the traditional approaches to condition assessment and the advanced techniques for automated OLM will encourage readers to consider strategies in their own organizations for applying the best features of each approach. Although new commercially available OLM systems have powerful data processing techniques, the equipment still requires a great deal of subject matter expertis...

2004-12-22T23:59:59.000Z

428

San Juan Life Assessment Study Phase 1  

Science Conference Proceedings (OSTI)

This report documents Phase 1 of a comprehensive study undertaken to provide information needed for evaluating possible plant retirement time frames for the San Juan Generating Station (SJGS). Work performed in this phase of the study included initial plant and environmental assessments, a review of cost and performance aspects of a larger group of plants with characteristics and/or operating histories similar to those of SJGS, and a reference-case market simulation and performance assessment of the stat...

2004-09-30T23:59:59.000Z

429

Probabilistic Risk Assessment - Insights for Executives  

Science Conference Proceedings (OSTI)

This report describes the development and use of a new Probabilistic Risk Assessment (PRA) training resource, Probabilistic Risk Assessment – Insights for Executives.  It consists of a slide package with speaker notes, for use by EPRI members to expand understanding of PRA and its applications among executives and nuclear power plant leadership teams.BackgroundWhile many technical disciplines in the nuclear industry have gained acceptance and are ...

2013-07-31T23:59:59.000Z

430

A Review of World Hydrocarbon Resource Assessments  

Science Conference Proceedings (OSTI)

This study reviews assessments of world oil, natural gas, and oil shale resources made between the end of World War II and the end of 1980. Details are provided on the methods used in developing these assessments, geographic coverage, time horizons, and major assumptions (e.g., about discovery rates and recovery factor). Conclusions on the current state of knowledge concerning each of these hydrocarbon resources are presented.

1982-11-01T23:59:59.000Z

431

An Assessment of Tropospheric Ozone Pollution  

Science Conference Proceedings (OSTI)

This assessment was prepared as an initiative of the North American Research Strategy for Tropospheric Ozone (NARSTO). The NARSTO partnership is a non-binding, tri-national public/private alliance, open to science agencies, regulatory agencies, regulated industries, academic institutions, environmentalists, and public interests groups in Canada, Mexico, and the United States. The NARSTO mission is to plan, coordinate, and facilitate comprehensive, long-term, policy-relevant scientific research and assess...

2000-09-25T23:59:59.000Z

432

Integrated Assessment Systems for Chemical Warfare Material  

Science Conference Proceedings (OSTI)

The US Army must respond to a variety of situations involving suspect discovered, recovered, stored, and buried chemical warfare materiel (CWM). In some cases, the identity of the fill materiel and the status of the fusing and firing train cannot be visually determined due to aging of the container, or because the item is contained in an over-pack. In these cases, non-intrusive assessments are required to provide information to allow safe handling, storage, and disposal of the materiel. This paper will provide an overview of the integrated mobile and facility-based CWM assessment system prototypes that have been, and are being developed, at the Idaho National Engineering and Environmental Laboratory (INEEL) for the US Army Non-Stockpile Chemical Materiel Project. In addition, this paper will discuss advanced sensors being developed to enhance the capability of the existing and future assessment systems. The Phase I Mobile Munitions Assessment System (MMAS) is currently being used by the Army's Technical Escort Unit (TEU) at Dugway Proving Ground, Utah. This system includes equipment for non-intrusively identifying the munitions fill materiel and for assessing the condition and stability of the fuzes, firing trains, and other potential safety hazards. The system provides a self-contained, integrated command post including an on-board computer system, communications equipment, video and photographic equipment, weather monitoring equipment, and miscellaneous safety-related equipment. The Phase II MMAS is currently being tested and qualified for use by the INEEL and the US Army. The Phase II system contains several new assessment systems that significantly enhance the ability to assess CWM. A facility-based munitions assessment system prototype is being developed for the assessment of CWM stored in igloos at Pine Bluff Arsenal, Arkansas. This system is currently in the design and fabrication stages. Numerous CWM advanced sensors are being developed and tested, and pending successful test results, may be incorporated in the various munitions assessment systems in the future. These systems are intended to enhance CWM fill materiel identification, agent air monitoring, agent or agent degradation product detection by surface analysis, and real-time x-ray capabilities.

A. M. Snyder; D. A. Verrill; G. L. Thinnes; K. D. Watts; R. J. McMorland

1999-05-27T23:59:59.000Z

433

Document Number Q0029500 Baseline Risk Assessment Update 4.0 Baseline Risk Assessment Update  

Office of Legacy Management (LM)

Baseline Risk Assessment Update Baseline Risk Assessment Update 4.0 Baseline Risk Assessment Update This section updates the human health and the ecological risk assessments that were originally presented in the 1998 RI (DOE 1998a). The impacts on the 1998 risk assessments are summarized in Section 2.9. 4.1 Human Health Risk Assessment Several activities completed since 1998 have contributed to changes in surface water and ground water concentrations. Activities that have impacted, or likely impacted surface water and ground water concentrations are Millsite Excavation (Section 2.1) Remediation of Soil and Sediment Along Montezuma Creek (Section 2.3) Millsite Dewatering and Treatment (Section 2.5) PRB Treatability Study (Section 2.6) Surface water and ground water monitoring data have been used to refine the list of COCs

434

Transportation risk assessment for ethanol transport  

E-Print Network (OSTI)

This research is aimed at assessing the quantitative risks involved with an ethanol pipeline. Pipelines that run from the Midwest, where the vast majority of ethanol is produced, to the target areas where reformulated gasoline is required (California, Texas Gulf Coast, New England Atlantic Coast) will be of particular interest. The goal is to conduct a quantitative risk assessment on the pipeline, truck, and rail transportation modes to these areas. As a result of the quantitative risk assessment, we are able to compare the risk associated with the different modes of transportation for ethanol. In order to perform and compare the quantitative risk assessment, the following challenges are addressed: 1) Identify target areas requiring reformulated gasoline 2) Map detailed route for each transportation mode to all three target areas 3) Perform a quantitative risk assessment for each transportation mode 4) Compare quantitative risk assessment results for each route and transportation mode The focus is on California, Texas Gulf Coast, and New England Atlantic Coast because of the large volume. It is beneficial to look at these areas as opposed to the smaller areas because pipeline transportation requires very large volumes. In order to find a meaningful comparison between all three transportation modes, only the areas with the three large volumes were evaluated. Since the risk assessment is completed using historical data, each route is segmented in a way that is consistent with the data that is available. All of the curves support the hypothesis that pipeline transportation poses the least societal risk when transporting ethanol from the Midwest to target areas. Rail transportation poses the largest amount of societal risk. While overall rail incidents are not as frequent as road incidents, the frequency of a fatality is much higher when an incident does occur.

Shelton Davis, Anecia Delaine

2007-12-01T23:59:59.000Z

435

Transportation risk assessment for ethanol transport  

E-Print Network (OSTI)

This research is aimed at assessing the quantitative risks involved with an ethanol pipeline. Pipelines that run from the Midwest, where the vast majority of ethanol is produced, to the target areas where reformulated gasoline is required (California, Texas Gulf Coast, New England Atlantic Coast) will be of particular interest. The goal is to conduct a quantitative risk assessment on the pipeline, truck, and rail transportation modes to these areas. As a result of the quantitative risk assessment, we are able to compare the risk associated with the different modes of transportation for ethanol. In order to perform and compare the quantitative risk assessment, the following challenges are addressed: • Identify target areas requiring reformulated gasoline • Map detailed route for each transportation mode to all three target areas • Perform a quantitative risk assessment for each transportation mode • Compare quantitative risk assessment results for each route and transportation mode The focus is on California, Texas Gulf Coast, and New England Atlantic Coast because of the large volume. It is beneficial to look at these areas as opposed to the smaller areas because pipeline transportation requires very large volumes. In order to find a meaningful comparison between all three transportation modes, only the areas with the three large volumes were evaluated. Since the risk assessment is completed using historical data, each route is segmented in a way that is consistent with the data that is available. All of the curves support the hypothesis that pipeline transportation poses the least societal risk when transporting ethanol from the Midwest to target areas. Rail transportation poses the largest amount of societal risk. While overall rail incidents are not as frequent as road incidents, the frequency of a fatality is much higher when an incident does occur.

Shelton Davis, Anecia Delaine

2007-12-01T23:59:59.000Z

436

Berkeley ReadyMade Impact Assessment: Developing an Effective and Efficient Assessment Template for Social Enterprises  

E-Print Network (OSTI)

work lead to broader social impact. For example, a nonprofitand Resources for Assessing Social Impact (TRASI). 3 2.need to evaluate broad social impact of proposed programs

Brown, Clair; Chait, Ariel; Freeman, Eric

2011-01-01T23:59:59.000Z

437

Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment  

E-Print Network (OSTI)

Biodiversity impacts . Bioethanol . Evenness . Geographicto produce a liter of bioethanol depends on where thethen assessed for three bioethanol feedstocks at different

Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

2010-01-01T23:59:59.000Z

438

In-Stage Assessment Process Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In-Stage Assessment Process Guide In-Stage Assessment Process Guide Provides guidance on conducting an In-Stage Assessment (ISA). An ISA is an independent review of a project's...

439

D&D and Risk Assessment Tools | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D and Risk Assessment Tools D&D and Risk Assessment Tools ORISE and PNNL both developed tools to assist in the risk assessment and planning of D&D activities. PNNL developed a...

440

Performance assessment review for Department of Energy  

Science Conference Proceedings (OSTI)

The United State Department of Energy (US DOE) disposes of low-level radioactive waste in near-surface disposal facilities. Safety of the disposal operations is evaluated for operational safety as well as long-term safety. Operational safety is evaluated based on the perceived level of hazard of the operation and may vary from a simple safety assessment to a safety analysis report. Long-term safety of all low-level waste disposal systems is evaluated through the conduct of a radiological performance assessment. The US DOE has established radiological performance objectives for disposal of low-level waste. They are to protect a member of the general public from receiving over 25 mrem/y, and an inadvertent intruder into the waste from receiving over 100 mrem/y continuous exposure or 400 mrem from a single exposure. For a disposal system to be acceptable, a performance assessment (PA) must be prepared which must be technically accurate and provide reasonable assurance that these performance objectives are met. Technical quality of the performance assessments is reviewed by a panel of experts. A number of lessons have been learned from conducting several preliminary reviews of performance assessments. These lessons are shared among the various US DOE sites to improve the process of evaluating low-level waste disposal sites for long-term performance.

Wilhite, E.L.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Performance assessment review for Department of Energy  

Science Conference Proceedings (OSTI)

The United State Department of Energy (US DOE) disposes of low-level radioactive waste in near-surface disposal facilities. Safety of the disposal operations is evaluated for operational safety as well as long-term safety. Operational safety is evaluated based on the perceived level of hazard of the operation and may vary from a simple safety assessment to a safety analysis report. Long-term safety of all low-level waste disposal systems is evaluated through the conduct of a radiological performance assessment. The US DOE has established radiological performance objectives for disposal of low-level waste. They are to protect a member of the general public from receiving over 25 mrem/y, and an inadvertent intruder into the waste from receiving over 100 mrem/y continuous exposure or 400 mrem from a single exposure. For a disposal system to be acceptable, a performance assessment (PA) must be prepared which must be technically accurate and provide reasonable assurance that these performance objectives are met. Technical quality of the performance assessments is reviewed by a panel of experts. A number of lessons have been learned from conducting several preliminary reviews of performance assessments. These lessons are shared among the various US DOE sites to improve the process of evaluating low-level waste disposal sites for long-term performance.

Wilhite, E.L.

1992-01-01T23:59:59.000Z

442

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

443

NREL-Biomass Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

NREL-Biomass Resource Assessment NREL-Biomass Resource Assessment (Redirected from Biomass Resource Assessment Presentation) Jump to: navigation, search Tool Summary Name: Biomass Resource Assessment Presentation Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Biomass, Transportation Topics: Resource assessment Resource Type: Maps Website: www.nrel.gov/international/biomass_resource.html References: Biomass Resource Assessment at NREL (Int'l)[1] Logo: Biomass Resource Assessment Presentation Overview "Biomass resource assessments quantify the existing or potential biomass material in a given area. Biomass resources include agricultural crops and residues; dedicated energy crops; forestry products and residues; animal wastes; residues and byproducts from food, feed, fiber, wood, and materials

444

FTCP Assessment Guidance and Criteria | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FTCP Assessment Guidance and Criteria FTCP Assessment Guidance and Criteria FTCP Assessment Guidance and Criteria This document establishes the guidance and criteria for conducting internal and independent Federal Technical Capability Assessments within the Department. The requirements of this document are applicable to those organizations having safety responsibilities for defense nuclear facilities. This includes both headquarters and field organizations. Regardless of the type of assessment conducted, the objectives and criteria within this document are used as a basis for the assessment. Use of consistent objectives and criteria is necessary to establish baselines and to track and trend performance. FTCP Assessment Guidance and Criteria, 1998 More Documents & Publications Technical Qualification Program and FTCP Assessment CRADs

445

Water Power Program: Marine and Hydrokinetic Resource Assessment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

the Tidal Streams Resource Map. Tidal Streams Resource Assessment The Assessment of the Energy Production from Tidal Streams in the United States report, created by Georgia Tech,...

446

EA-1568: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1568: Final Environmental Assessment Replacement Source of Steam for A Area at the Savannah River Site The U.S. Department of Energy (DOE) prepared...

447

EA-1773: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1773: Final Environmental Assessment NEOS New Planet BioEnergy, LLC Commercial Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida...

448

Risk assessment framework for geologic carbon sequestration sites  

E-Print Network (OSTI)

Framework for geologic carbon sequestration risk assessment,for geologic carbon sequestration risk assessment, Energyfor Geologic Carbon Sequestration, Int. J. of Greenhouse Gas

Oldenburg, C.

2010-01-01T23:59:59.000Z

449

EA-1482: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1482: Final Environmental Assessment Pilot Experiment for Geological Sequestration of Carbon Dioxide in Saline Aquifer Brine Formations The U.S. Department of...

450

EA-1846: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1846: Final Environmental Assessment Demonstration of Carbon Dioxide Capture and Sequestration of Steam Methane Reforming Process Gas Used for...

451

EA-1886: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1886: Draft Environmental Assessment Big Sky Regional Carbon Sequestration Partnership - Phase III: Kevin Dome Carbon Storage Project, Shelby,...

452

EA-1336: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Final Environmental Assessment EA-1336: Final Environmental Assessment Ocean Sequestration of Carbon Dioxide Field Experiment This EA evaluates the environmental impacts for the...

453

EA-1247: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Final Environmental Assessment EA-1247: Final Environmental Assessment Electrical Power System Upgrades at Los Alamos National Laboratory This EA evaluates the environmental...

454

Lessons Learned from Cyber Security Assessments of SCADA and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems...

455

Energy Performance Assessment for Equipment and Utility Systems...  

Open Energy Info (EERE)

Energy Performance Assessment for Equipment and Utility Systems: Third Edition Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Performance Assessment for...

456

Two Independent Assessments Find the Department of Energy's Yucca...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Assessments Find the Department of Energy's Yucca Mountain Project is on Track Two Independent Assessments Find the Department of Energy's Yucca Mountain Project is on...

457

Social Theory, Impact Assessment and Northern Native Communities  

E-Print Network (OSTI)

provides a useful list of 21 social impact categories in ''Issues in Social Impact Assessment, "' Plan Canada, 18 (Junen d S. Rittenberg, . . Social Impact Assessment: A State of

Weaver, Clyde; Cunningham, Alain M.

1985-01-01T23:59:59.000Z

458

EA-1183: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1183: Final Environmental Assessment Coal-fired Diesel Generator University of Alaska, Fairbanks, Alaska This EA evaluates the environmental...

459

EA-1292: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1292: Final Environmental Assessment On-site Treatment of Low Level Mixed Waste This EA evaluates the environmental impacts for the proposal to evaluate the...

460

EA-0820: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-0820: Final Environmental Assessment Construction of Mixed Waste Storage RCRA Facilities, Buildings 7668 and 7669 This EA evaluates the...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EA-1515: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Final Environmental Assessment EA-1515: Final Environmental Assessment Proposed Closure of the Airport Landfills Within Technical Area 73 at Los Alamos National Laboratory, Los...

462

Specific Examples of Global Activities Environmental assessment in Azerbaijan  

E-Print Network (OSTI)

Specific Examples of Global Activities · Environmental assessment in Azerbaijan · Study abroad · Environmental assessment in Azerbaijan · Study abroad entrepreneurship internship with the Tsinghua University

463

EA-1068: Final Programmatic Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Programmatic Environmental Assessment Final Programmatic Environmental Assessment EA-1068: Final Programmatic Environmental Assessment State Energy Conservation Program This programmatic environmental assessment assesses the impacts associated with the U.S. Department of Energy State Energy Conservation Program (SECP). This document identifies and evaluates broad types of projects that can be funded under the SECP and establishes a bounding analysis for those projects relative to their potential impacts to man and the environment. DOE/EA-1068: Programmatic Environmental Assessment for the State Energy Conservation Program (June 1996) More Documents & Publications EA-1068: Finding of No Significant Impact EA-1528: Final Environmental Assessment EA-1535: Final Programmatic Environmental Assessment

464

EA-1949: FERC Final Environmental Assessment | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Environmental Assessment EA-1949: FERC Final Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA On September 16, 2010, Snohomish PUD was selected...

465

EA-1146: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1146: Final Environmental Assessment Radioactive Waste Storage at Rocky Flats Environmental Technology Site, Golden, Colorado This EA evaluates the environmental...

466

EA-1558: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1558: Final Environmental Assessment National Synchrotron Light Source II at Brookhaven National Laboratory This environmental assessment addresses the Proposed Action by...

467

A Framework for Comparative Assessments of Energy Efficiency...  

NLE Websites -- All DOE Office Websites (Extended Search)

A Framework for Comparative Assessments of Energy Efficiency Policy Measures Title A Framework for Comparative Assessments of Energy Efficiency Policy Measures Publication Type...

468

A Methodological Framework for Comparative Assessments of Equipment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Methodological Framework for Comparative Assessments of Equipment Energy Efficiency Policy Measures Title A Methodological Framework for Comparative Assessments of Equipment Energy...

469

EA-1925: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOE...

470

Appendix B: California ISO Real Time Voltage Security Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

B: California ISO Real Time Voltage Security Assessment (VSA) Summary Report Title Appendix B: California ISO Real Time Voltage Security Assessment (VSA) Summary Report Publication...

471

Appendix A: California ISO Real Time Voltage Security Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

A: California ISO Real Time Voltage Security Assessment (VSA) Project: Summary of Survey Results on Methodologies for use in Real-Time Voltage Security Assessment Title Appendix A:...

472

EA-1840: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: Final Environmental Assessment EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California...

473

GAO Cost Estimating and Assessment Guide | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GAO Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide GAO 12-Step Estimating Process.pdf More Documents & Publications EIR SOP Septmebr 2010 Microsoft...

474

Rapid Assessment of City Emissions (RACE) for Low Carbon Cities...  

Open Energy Info (EERE)

Assessment of City Emissions (RACE) for Low Carbon Cities: Transport and Building Electricity Use Jump to: navigation, search Name Rapid Assessment of City Emissions (RACE) for...

475

EA-1643: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Assessment EA-1643: Final Environmental Assessment 10 CFR 431 Commercial Refrigeration Equipment This chapter (16) describes potential environmental effects...

476

EA-1111: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Final Environmental Assessment EA-1111: Final Environmental Assessment K Pool Fish Rearing, Hanford Site, Richland, Washington This EA evaluates the environmental impacts of the...

477

EA-1932: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

478

EA-1728: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA evaluates the...

479

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year...

480

EA-1890: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1890: Draft Environmental Assessment Reedsport Deployment and Ocean Test Project The scope of the DOE Reedsport Deployment and Ocean Test project...

Note: This page contains sample records for the topic "assessments plant-wide assessments" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

An Assessment of Analytical Capabilities, Services and Tools...  

NLE Websites -- All DOE Office Websites (Extended Search)

An Assessment of Analytical Capabilities, Services and Tools for Demand Response Title An Assessment of Analytical Capabilities, Services and Tools for Demand Response Publication...

482

EA-1917: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable...

483

Montana Ground Water Assessment Act (Montana) | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Water Assessment Act (Montana) Montana Ground Water Assessment Act (Montana) Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State...

484

Microsoft Word - Chemical Security Assessment Tool.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure Security Analysis Chemical Security Assessment Tool In support of chemical security regulation the Chemical Security Assessment Tool (CSAT) is the Department of...

485

EA-1698: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1698: Final Environmental Assessment Baldwin Wind Energy Center The Baldwin Wind Energy Center (Project or Proposed Action) is a wind generation...

486

EA-1542: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1542: Final Environmental Assessment Burleigh County Wind Energy Center The Burleigh County Wind Energy Center is a wind generation project proposed...

487

EA-1903: Notice of Availability of Draft Environmental Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Notice of Availability of Draft Environmental Assessment EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project,...

488

EA-1917: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces...

489

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Draft Environmental Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen...

490

EA-1900: Notice of Availability of a Final Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Availability of a Final Environmental Assessment and Finding of No Significant Impact EA-1900: Notice of Availability of a Final Environmental Assessment and Finding of No...

491

EA-1929: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1929: Notice of Availability of a Draft Environmental Assessment NorthStar Medical Technologies LLC, Commercial...

492

EA-1922: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a Draft Environmental Assessment Combined Power and Biomass Heating System, Fort...

493

EA-1900: Notice of Availability of a Draft Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory...

494

EA-1960: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

495

EA-1189: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1189: Final Environmental Assessment Non-thermal Treatment of Hanford Site Low-level Mixed Waste This EA evaluates the environmental impacts for...

496

EA-1135: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

35: Final Environmental Assessment EA-1135: Final Environmental Assessment Offsite Thermal Treatment of Low-level Mixed Waste This EA evaluates the environmental impacts of the...

497

EA-1506: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1506: Final Environmental Assessment Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant The purpose of the Proposed Action,...

498

EA-1897: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1897: Final Environmental Assessment AltaRock's Newberry Volcano EGS Demonstration near Bend, Oregon This EA evaluates the environmental impacts...

499

EA-1925: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1925: Final Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon This EA evaluates Ormat Nevada, Inc.'s...

500

EA-1404: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

404: Final Environmental Assessment EA-1404: Final Environmental Assessment Actinide Chemistry and Repository Science Laboratory This EA evaluates the environmental impacts for the...