National Library of Energy BETA

Sample records for assessments environmental impact

  1. Environmental Impact Statements and Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the ...

  2. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Environmental Assessments (EA) Environmental Impact Statements (EIS) New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Training NEPA ...

  3. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  4. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Princeton Site Office (PSO) PSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 National Environmental Policy Act (NEPA) Documents Environmental

  5. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Argonne Site Office (ASO) ASO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 National Environmental Policy Act (NEPA) Documents

  6. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Berkeley Site Office (BSO) BSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: Email Us National Environmental Policy Act (NEPA) Documents

  7. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  8. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 National Environmental Policy Act (NEPA)

  9. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Processing | National Nuclear Security Administration Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), has prepared this Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing to evaluate the potential environmental impacts associated with transporting plutonium from foreign nations to the United States, storing the plutonium at

  10. ISC-Chicago Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Office Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  11. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  12. Environmental Assessment Fact Sheet - Potential Impacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE has prepared a draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. It examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assessment also looks at the potential cumulative impacts of conducting experiments and operating the WIPP as a transuranic waste repository. This fact sheet presents

  13. Environmental Impact Statements and Environmental Assessments Status Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process, links to the project pages, and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation

  14. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products PDF icon ...

  15. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    SLAC Site Office U.S. Department of Energy Bldg 41, MS 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 National Environmental Policy Act (NEPA) Documents...

  16. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Resources Contact Information Pacific Northwest Site Office U.S. Department of Energy P.O. Box 350, MS K9-42 Richland, WA 99352 P: (509) 372-4005 National Environmental Policy...

  17. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products This March 28, ...

  18. Determining Vulnerability Importance in Environmental Impact Assessment

    SciTech Connect (OSTI)

    Toro, Javier; Duarte, Oscar; Requena, Ignacio; Zamorano, Montserrat

    2012-01-15

    The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed. - Research Highlights: Black-Right-Pointing-Pointer The concept of vulnerability could be considered defining Vulnerability Importance included in qualitative EIA methodology. Black-Right-Pointing-Pointer The use of the concept of environmental vulnerability could reduce the subjectivity of qualitative methods of EIA. Black-Right-Pointing-Pointer A method to quantify the Vulnerability Importance proposed provides a comprehensive overview of the environmental state. Black-Right-Pointing-Pointer Results in Colombia highlight the usefulness and objectivity of this method.

  19. Integrating environmental justice (EJ) methodologies into environmental impact assessment

    SciTech Connect (OSTI)

    Zimmerman, R.

    1995-12-01

    Environmental Justice (EJ) concerns are now a pervasive part of environmental policy. Moreover, Federal Executive Order 12898 mandates its diffusion throughout federal government programs, and many states are developing similar programs. EJ concerns first arose in the environmental field in the context of hazardous waste facilities. Thus, hazardous waste applications provide important analytical models for EJ issues addressed in other programs, such as environmental assessment (EA). At the present time, EJ concerns are treated largely qualitatively in EAs and environmental impact statements (EISs) in sections dealing with neighborhood and community character or socioeconomics. The manner in which EJ issues are examined in EISs is described using examples from recent EISs, and an approach to quantifying EJ in terms of demographic patterns is presented using techniques previously applied by the author to hazardous waste sites (primarily sites on the National Priorities List under the Superfund program). Various geographic levels and demographic parameters are discussed and compared. A key point is the manner in which the choice of a comparison area influences conclusions about a particular area. these methods are critical in addressing such issues as whether proposed projects are being located in areas with relatively greater proportions of {open_quotes}vulnerable{close_quotes} populations or, in the case of public service projects, how these populations are served relative to other populations by the facilities that are the subject of the assessment.

  20. A qualitative method proposal to improve environmental impact assessment

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Duarte, Oscar; Zamorano, Montserrat

    2013-11-15

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.

  1. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle ...

  2. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part I: Review of the Life-Cycle Energy Consumption of Incandescent, Compact Fluorescent, and LED ...

  3. Finding of No Significant Impact Issued on Environmental Assessment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of No Significant Impact for the Final Environmental Assessment for the Remote-handled Waste Disposition Project (WDP-RWMC-09-008.)" Paper copies are available by contacting...

  4. Environmental Impact Assessment (EIA) Process of V1 NPP Decommissioning

    SciTech Connect (OSTI)

    Matejovic, Igor; Polak, Vincent

    2007-07-01

    Through the adoption of Governmental Resolution No. 801/99 the Slovak Republic undertook a commitment to shutdown units 1 and 2 of Jaslovske Bohunice V 1 NPP (WWER 230 reactor type) in 2006 and 2008 respectively. Therefore the more intensive preparation of a decommissioning documentation has been commenced. Namely, the VI NPP Conceptual Decommissioning Plan and subsequently the Environmental Impact Assessment Report of VI NPP Decommissioning were developed. Thus, the standard environmental impact assessment process was performed and the most suitable alternative of V1 NPP decommissioning was selected as a basis for development of further decommissioning documents. The status and main results of the environmental impact assessment process and EIA report are discussed in more detail in this paper. (authors)

  5. Cumulative impacts in environmental assessments: How well are they considered

    SciTech Connect (OSTI)

    McCold, L. ); Holman, J. )

    1993-01-01

    The authors analyzed 89 environmental assessments published in the Federal Register from January 1 through June 30, 1992, to determine the extent to which their treatment of cumulative impacts met the requirements of 40 CFR 1500-1508. Only 35 (39%) EAs mentioned cumulative impacts. Nineteen EAs addressed cumulative impacts of some resources, but not others. The paper presents several recommendations: (1) past, present and reasonable foreseeable actions that could affect resources affected by the proposed action should be identified at the same time as, and be listed with, the proposed action. (2) for each resource, the discussion of cumulative impacts should follow immediately after the discussion of direct impacts to that resource. (3) conclusions about cumulative impacts should be supported by data and analyses. (4) agencies need a central review function to ensure the quality of their EAs.

  6. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide ...

  7. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, 2005) The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, ...

  8. A state-impact-state methodology for assessing environmental impact in land use planning

    SciTech Connect (OSTI)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  9. The Environmental Style: Writing Environmental Assessments and Impact

    Energy Savers [EERE]

    Energy The Energy Department Prepares for Tropical Storm Karen The Energy Department Prepares for Tropical Storm Karen October 4, 2013 - 3:00pm Addthis Marissa Newhall Marissa Newhall Director of Digital Strategy and Communications What does this mean for me? Follow the latest news on Tropical Storm Karen by visiting the FEMA blog. Stay up-to-date on energy delivery impacts by reading twice-daily situation reports from the Energy Department. Visit ready.gov for more information about

  10. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Sponsoring Org: USDOE Country of Publication: United States Language: English Subject: 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE; ...

  11. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Part 2: LED Manufacturing and Performance Scholand, Michael; Dillon, Heather E. 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE;...

  12. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    ... life-cycle environmental impact of the LED lamps is favorable when compared to CFLs and incandescent lamps, recycling will likely gain importance as consumer adoption increases. ...

  13. Environmental impact assessment in Sri Lanka: A progress report

    SciTech Connect (OSTI)

    Butler, J.W.

    1995-12-01

    The paper reports on progress by the Government of Sri Lanka in the implementation of a formal environmental impact assessment (EIA) requirement. The authors have recently conducted several activities in Sri Lanka intended to improve the analytical quality of EIA documents and the utility of the EIA process in government decisionmaking, with particular attention to the use of programmatic or sectoral EIAs. The U.S. Agency for International Development established a 5-year project, the Natural Resources and Environmental Policy Project (NAREPP), to provide training and technical assistance in EIA and related disiplines for the Central Environmental Authority (CEA), several other Sri Lanka government agencies, and the private sector. This activity has involved efforts to expand the technical expertise within Sri Lanka for conducting EIA, which include developing EIA courses and materials in cooperation with several universities and conducting intensive training programs for both government and private-sector environmental professionals. This EIA will focus on the selection of government-approved industrial estates throughout the country, on which most new industrial development projects are to be located. Further training programs in the use of current analytical methodologies for EIA were also developed and conducted. The effectiveness of these activities can be assessed by evaluating changes in the content and quality of subsequent EIA documents and in the extent to which such documents affect environmental decisionmaking in Sri Lanka. The authors discuss the role of the programmatic EIA in the industrial development program of Sri Lanka, remaining constraints on the EIA process, and recommendations for further improvement.

  14. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Office of Scientific and Technical Information (OSTI)

    Products, Part 3: LED Environmental Testing (Technical Report) | SciTech Connect Technical Report: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products, Part 3: LED Environmental Testing This report covers the third part of a larger U.S. Department of Energy (DOE) project to assess the life-cycle

  15. Public participation in environmental impact assessment: why, who and how?

    SciTech Connect (OSTI)

    Glucker, Anne N.; Driessen, Peter P.J.; Kolhoff, Arend; Runhaar, Hens A.C.

    2013-11-15

    Even a cursory glance at the literature on environmental impact assessment (EIA) reveals that public participation is being considered as an integral part of the assessment procedure. Public participation in EIA is commonly deemed to foster democratic policy-making and to render EIA more effective. Yet a closer look at the literature unveils that, beyond this general assertion, opinions of the precise meaning, objectives and adequate representation of public participation in EIA considerably diverge. Against this background, in this article we aim to provide a comprehensive overview of the academic debate on public participation in EIA concerning its meaning, objectives and adequate level of inclusiveness. In so doing, we hope to stimulate a more focused debate on the subject, which is key to advancing the research agenda. Furthermore, this paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA practice. -- Highlights: • There is little reflection on the meaning, objectives and adequate level of inclusiveness of public participation in EIA. • We provide a comprehensive overview of the academic debate on public participation in EIA concerning the meaning, objectives and adequate level of inclusiveness. • Theoretical claims put forth by scholars are contrasted with empirical evidence. • Overview shall stimulate a more focused debate on the subject. • This paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA.

  16. Setting boundaries of participation in environmental impact assessment

    SciTech Connect (OSTI)

    Salomons, Geoffrey H.; Hoberg, George

    2014-02-15

    Public participation processes are touted as an effective way to increase the capacity and legitimacy of environmental assessment and the regulatory process that rely on them. Recent changes to the Canadian environmental assessment process narrowed the criteria for who can participate in environmental assessments from any who were interested to those who were most directly affected. This article examines the potential consequences of this change by exploring other areas of Canadian regulatory law where a similar directed affected test has been applied. This new standard risks institutionalizing the long-understood representational bias confronted by more diffuse interest like environmental protection. Restricting participation to the “directly affected” is far too narrow a test for processes like environmental assessment that are designed to determine the public interest. -- Highlights: • Public participation can improve the legitimacy of environmental assessments. • New Canadian rules narrow the range of eligible participants. • Similar rules in Alberta have excluded environmental representation. • The new rules may institutionalize bias against more diffuse interests. • Restricting participation to the “directly affected” is far too narrow.

  17. Text Alternative Version: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products" webcast, held March 28, 2013.

  18. U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL IMPACT STATEMENTS AND ENVIRONMENTAL ASSESSMENTS STATUS CHART Office of NEPA Policy and Compliance 202-586-4600 1-800-472-2756 (leave message) Report Date: 5/13/2016 This chart represents anticipated activity and is not a commitment for documentation or dates, nor a commitment that DOE will adopt the document when it acts as a cooperating agency in preparation of an EIS or EA. This chart is available on the DOE NEPA Web site at energy.gov/NEPA Total Actions Total Actions * Shaded

  19. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    If the Proposed Action is determined to be major and significant, an environmental impact statement ... Department of Energy Implementing Procedures for the National Environmental ...

  20. Environmental impact assessment of abnormal events: a follow-up study

    SciTech Connect (OSTI)

    Hunsaker, D.B. Jr.; Lee, D.W.

    1985-01-01

    Impact analyses included in environmental assessments for a selected nuclear power plant, petroleum storage facility, crude oil pipeline, and geopressure well that have experienced operational, abnormal events are compared with the data quantifying the environmental impacts of the events. Comparisons of predicted vs actual impacts suggests that prediction of the types of events and associated impacts could be improved; in some instances, impacts have been underestimated. Analysis of abnormal events is especially important in environmental assessment documents addressing a technology that is novel or unique to a particular area. Incorporation of abnormal event impact analysis into project environmental monitoring and emergency response plans can help improve these plans and can help reduce the magnitude of environmental impacts resulting from said events.

  1. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 4 Environmental Impacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-1 CHAPTER 4 ENVIRONMENTAL IMPACTS The following sections describe the environmental impacts that could occur as a result of the proposed activities at the WIPP site. 4.1 HUMAN HEALTH The human health impacts of the proposed astrophysics experiments are quantified in this section to the extent possible given the uncertainties in the actual experiments to be performed at WIPP. For the most part, the health hazards associated with each experiment are discussed individually, although specific

  2. Hybrid LCA model for assessing the embodied environmental impacts of buildings in South Korea

    SciTech Connect (OSTI)

    Jang, Minho; Hong, Taehoon; Ji, Changyoon

    2015-01-15

    The assessment of the embodied environmental impacts of buildings can help decision-makers plan environment-friendly buildings and reduce environmental impacts. For a more comprehensive assessment of the embodied environmental impacts of buildings, a hybrid life cycle assessment model was developed in this study. The developed model can assess the embodied environmental impacts (global warming, ozone layer depletion, acidification, eutrophication, photochemical ozone creation, abiotic depletion, and human toxicity) generated directly and indirectly in the material manufacturing, transportation, and construction phases. To demonstrate the application and validity of the developed model, the environmental impacts of an elementary school building were assessed using the developed model and compared with the results of a previous model used in a case study. The embodied environmental impacts from the previous model were lower than those from the developed model by 4.6–25.2%. Particularly, human toxicity potential (13 kg C{sub 6}H{sub 6} eq.) calculated by the previous model was much lower (1965 kg C{sub 6}H{sub 6} eq.) than what was calculated by the developed model. The results indicated that the developed model can quantify the embodied environmental impacts of buildings more comprehensively, and can be used by decision-makers as a tool for selecting environment-friendly buildings. - Highlights: • The model was developed to assess the embodied environmental impacts of buildings. • The model evaluates GWP, ODP, AP, EP, POCP, ADP, and HTP as environmental impacts. • The model presents more comprehensive results than the previous model by 4.6–100%. • The model can present the HTP of buildings, which the previous models cannot do. • Decision-makers can use the model for selecting environment-friendly buildings.

  3. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting

    Office of Scientific and Technical Information (OSTI)

    Products Part 2: LED Manufacturing and Performance (Technical Report) | SciTech Connect Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Citation Details In-Document Search Title: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part 2: LED Manufacturing and Performance Part 2 of the project (this report) uses the conclusions from Part 1 as a point of departure to focus on two

  4. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, ... and the DOE's NEPA Implementing Procedures (Title 10, CFR, Part 102 1, ...

  5. Legal and institutional framework of environmental impact assessment in Nigeria: An initial assessment

    SciTech Connect (OSTI)

    Olokesusi, F.

    1998-03-01

    Nigeria, the most populous country in Africa, has high rates of urbanization and industrialization. Until recently, decisions on most large-scale projects such as expressways, harbors, industries, dams, and irrigation were considered with an emphasis on traditional technical and cost-benefit analysis. Spurred by massive environmental degradation and persistent community agitation in oil producing areas, environmental impact assessment (EIA) legislation was passed in late 1992. The main purpose of this article is to review and assess the content of this legislation and the guidelines produced by the Federal Environmental Protection Agency (FEPA), the institution responsible for EIA administration. Some EIA reports have been prepared and reviewed by FEPA since 1994. There are some positive outcomes and expectations, but some problems have been identified as well, including: deliberate restriction of public involvement and participation by proponents and/or their consultants, interagency conflict leading to high cost and project delays especially in the oil industry, and restriction of public access to final EIA reports. These are discussed, and recommendations for improving the process are made.

  6. A protocol for lifetime energy and environmental impact assessment of building insulation materials

    SciTech Connect (OSTI)

    Shrestha, Som S. Biswas, Kaushik; Desjarlais, Andre O.

    2014-04-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist, which provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different building insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines. - Highlights: • We proposed a protocol to evaluate the environmental impacts of insulation materials. • The protocol considers all life cycle stages of an insulation material. • Both the direct environmental impacts and the indirect impacts are defined. • Standardized calculation methods for the ‘avoided operational energy’ is defined. • Standardized calculation methods for the ‘avoided environmental impact’ is defined.

  7. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    category of hazardous waste to landfill, which is driven by the upstream energy and environment impacts from the manufacturing of the aluminum from raw materials. Although...

  8. Walking the sustainability assessment talk - Progressing the practice of environmental impact assessment (EIA)

    SciTech Connect (OSTI)

    Morrison-Saunders, Angus; Retief, Francois

    2012-09-15

    Internationally there is a growing demand for environmental impact assessment (EIA) to move away from its traditional focus towards delivering more sustainable outcomes. South Africa is an example of a country where the EIA system seems to have embraced the concept of sustainability. In this paper we test the existing objectives for EIA in South Africa against sustainability principles and then critique the effectiveness of EIA practice in delivering these objectives. The outcome of the research suggests that notwithstanding a strong and explicit sustainability mandate through policy and legislation, the effectiveness of EIA practice falls far short of what is mandated. This shows that further legislative reform is not required to improve effectiveness but rather a focus on changing the behaviour of individual professionals. We conclude by inviting further debate on what exactly practitioners can do to give effect to sustainability in EIA practice.

  9. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    a more detailed assessment of the LED manufacturing process and used these findings to ... A total of 22 samples, representing 11 different models, were tested to determine whether ...

  10. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Drawing from the Part 1 findings, Part 2 performed a more detailed assessment of the LED manufacturing process and used these findings to provide a comparative LCA taking into ...

  11. The National Environmental Policy Act net (NEPAnet) and DOE NEPA Web: What they bring to environmental impact assessment

    SciTech Connect (OSTI)

    Jessee, L.

    1998-01-01

    The US National Environmental Policy Act of 1969 (NEPA) requires agencies to use a systematic, interdisciplinary approach to ensure integrated use of natural and social sciences and the environmental design arts in planning and decision-making. Numerous environmental analyses have been prepared that contain valuable information about regions and ecosystems, but these data were not stored in a retrievable manner. In 1993 and 1994, agency-specific NEPA and related datasets were consolidated into the US Department of Energy NEPA Web and NEPAnet. These improve the efficiency and effectiveness of the environmental impact assessment/NEPA process in the US.

  12. A Protocol for Lifetime Energy and Environmental Impact Assessment of Building Insulation Materials

    SciTech Connect (OSTI)

    Shrestha, Som S; Biswas, Kaushik; Desjarlais, Andre Omer

    2014-01-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors, and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist that provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines.

  13. The role of the international professional organization in the growth and development of environmental impact assessment

    SciTech Connect (OSTI)

    Voland, M.E. ); Page, J.M. )

    1993-01-01

    Environmental impact assessment is an international phenomenon. A concept begun by the National Environmental Policy Act (NEPA) of 1969 in the US is becoming an important component of development planning throughout the world. In the summer of 1992, professionals from 44 countries attended the annual meeting of the International Association for Impact Assessment (IAIA). The impact studies can go beyond the project focus of the US to encompass regional and country planning. Through active involvement in the meetings of the international professional organization, the environmental professional has the opportunity to hear formal presentations by those who have differing experiences based upon what is possible within their political and cultural systems. Further, informal interaction at these meetings provides the opportunity to share information, and learn from one another. This presentation will address the role of the professional organization in supporting environmental impact assessment internationally, particularly in developing nations; ways the professional organization can fulfill that role; and how a particular organization, the International Association for Impact Assessment, addresses these challenges.

  14. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION

  15. Assessing cumulative impacts within state environmental review frameworks in the United States

    SciTech Connect (OSTI)

    Ma Zhao; Becker, Dennis R.; Kilgore, Michael A.

    2009-11-15

    Cumulative impact assessment (CIA) is the process of systematically assessing a proposed action's cumulative environmental effects in the context of past, present, and future actions, regardless of who undertakes such actions. Previous studies have examined CIA efforts at the federal level but little is known about how states assess the cumulative impacts of nonfederal projects. By examining state environmental review statutes, administrative rules, agency-prepared materials, and a national survey of the administrators of state environmental review programs, this study identifies the legal and administrative frameworks for CIA. It examines current CIA practice, discusses the relationship between CIA policy and its implementation, and explores the opportunities for improvement. The results of the study show that twenty-nine state environmental review programs across twenty-six states required the assessment of cumulative environmental impacts. More than half of these programs have adopted specific procedures for implementing their policies. Some programs assessed cumulative impacts using a standard review document, and others have created their own documentations incorporated into applications for state permits or funding. The majority of programs have adopted various scales, baselines, significance criteria, and coordination practices in their CIA processes. Mixed methods were generally used for data collection and analysis; qualitative methods were more prevalent than quantitative methods. The results also suggest that a program with comprehensive and consistent environmental review policies and procedures does not always imply extensive CIA requirements and practices. Finally, this study discusses the potential for improving existing CIA processes and promoting CIA efforts in states without established environmental review programs.

  16. DOE issues Finding of No Significant Impact on Environmental Assessment for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site doe logo U.S. Department of Energy Idaho Operations Office Media Contact: Tim Jackson (208) 526-8484 For Immediate Release December 21, 2011 DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site Idaho Falls, ID ďż˝ After completing a careful assessment, the U.S.

  17. EA-0372: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Energy Conservation Standards for Consumer Products: Refrigerators, Furnaces and Television Sets including Environmental Assessment Regulatory Impact Analysis

  18. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT

  19. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; Lloyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2013-11-01

    Environmental and health impacts are presented for activities associated with transient testing of nuclear fuel and material using two candidate test reactors. Transient testing involves irradiation of nuclear fuel or materials for short time-periods under high neutron flux rates. The transient testing process includes transportation of nuclear fuel or materials inside a robust shipping cask to a hot cell, removal from the shipping cask, pre-irradiation examination of the nuclear materials, assembly of an experiment assembly, transportation of the experiment assembly to the test reactor, irradiation in the test reactor, transport back to the hot cell, and post-irradiation examination of the nuclear fuel or material. The potential for environmental or health consequences during the transportation, examination, and irradiation actions are assessed for normal operations, off-normal (accident) scenarios, and transportation. Impacts to the environment (air, soil, and groundwater), are assessed during each phase of the transient testing process. This report documents the evaluation of potential consequences to the general public. This document supports the Environmental Assessment (EA) required by the U.S. National Environmental Policy Act (NEPA) (42 USC Subsection 4321 et seq.).

  20. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    SciTech Connect (OSTI)

    N /A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  1. Environmental impact assessment in Colombia: Critical analysis and proposals for improvement

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Zamorano, Montserrat

    2010-07-15

    The evaluation of Environmental Impact Assessment (EIA) systems is a highly recommended strategy for enhancing their effectiveness and quality. This paper describes an evaluation of EIA in Colombia, using the model and the control mechanisms proposed and applied in other countries by Christopher Wood and Ortolano. The evaluation criteria used are based on Principles of Environmental Impact Assessment Best Practice, such as effectiveness and control features, and they were contrasted with the opinions of a panel of Colombian EIA experts as a means of validating the results of the study. The results found that EIA regulations in Colombia were ineffective because of limited scope, inadequate administrative support and the inexistence of effective control mechanisms and public participation. This analysis resulted in a series of recommendations regarding the further development of the EIA system in Colombia with a view to improving its quality and effectiveness.

  2. The role of Life Cycle Assessment in identifying and reducing environmental impacts of CCS

    SciTech Connect (OSTI)

    Sathre, Roger; Masanet, Eric; Cain, Jennifer; Chester, Mikhail

    2011-04-20

    Life Cycle Assessment (LCA) should be used to assist carbon capture and sequestration (CCS) planners to reduce greenhouse gas (GHG) emissions and avoid unintended environmental trade-offs. LCA is an analytical framework for determining environmental impacts resulting from processes, products, and services. All life cycle stages are evaluated including raw material sourcing, processing, operation, maintenance, and component end-of-life, as well as intermediate stages such as transportation. In recent years a growing number of LCA studies have analyzed CCS systems. We reviewed 50+ LCA studies, and selected 11 studies that compared the environmental performance of 23 electric power plants with and without CCS. Here we summarize and interpret the findings of these studies. Regarding overall climatemitigation effectiveness of CCS, we distinguish between the capture percentage of carbon in the fuels, the net carbon dioxide (CO2) emission reduction, and the net GHG emission reduction. We also identify trade-offs between the climate benefits and the potential increased non-climate impacts of CCS. Emissions of non-CO2 flue gases such as NOx may increase due to the greater throughput of fuel, and toxicity issues may arise due to the use of monoethanolamine (MEA) capture solvent, resulting in ecological and human health impacts. We discuss areas where improvements in LCA data or methods are needed. The decision to implement CCS should be based on knowledge of the overall environmental impacts of the technologies, not just their carbon capture effectiveness. LCA will be an important tool in providing that knowledge.

  3. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; LLoyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2014-02-01

    This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

  4. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    SciTech Connect (OSTI)

    Goff, S.J.

    2000-05-28

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide is a good start for providing the geothermal community a standard EIA format. As decision makers may only read the Executive Summary of the EIA, this summary should be well written and present the significant impacts (in order of importance), clarifying which are unavoidable and which are irreversible; the measures which can be taken to mitigate them; the cumulative effects of impacts; and the requirements for monitoring and supervision. Quality plans and Public Participation plans should also be included as part of the environmental analysis process.

  5. Environmental impact assessment in the Philippines: Progress, problems, and directions for the future

    SciTech Connect (OSTI)

    Ross, W.A. )

    1994-07-01

    The environmental impact statement (EIS) system of the Philippines is reviewed, identifying progress made in its effective implementation since 1986. Improvement in coverage is noted and real commitment to good environmental impact assessment (EIA) practice is found in those responsible for the EIS system. Project proponents show a modest acceptance of the system. Major problems remaining are: (1) the EIS system is seen as a bureaucratic requirement needed to obtain project approvals; (2) political interference determines the outcome of some environmental reviews; (3) questionable practices by public servants serve to discredit the system; and (4) the treatment of projects in environmentally critical areas is less than satisfactory. Based on the principle that it is essential to establish a credible process seen to work effectively by the public, politicians, the government bureaucracy, and proponents, suggestions for improvement are made. They deal with the treatment of EISs for projects already under construction, EIA training courses, and simple adjustments to the EIS system to focus it on the most important projects.

  6. Strengthening the link between project planning and environmental impact assessment : the assembled chemical weapons assessment dialogue process.

    SciTech Connect (OSTI)

    Goldberg, M. S.; Environmental Assessment

    2003-01-01

    An approach to stakeholder involvement known as the Dialogue process has been an integral part of the US Department of Defense Assembled Chemical Weapons Assessment (ACWA) Program from its inception. It has provided a means of soliciting stakeholder input before key decisions are made. The projects developed under the ACWA Program are characterized as major federal actions and therefore also must meet the requirements of the National Environmental Policy Act (NEPA). One of these is the requirement for public participation in the environmental impact assessment process. This case study describes the ACWA Dialogue and NEPA processes, and examines their relationship in the implementation of the ACWA Program. The examination suggests that involving the public at the beginning of a program through a Dialogue-like process can introduce environmental considerations early in the project development process and contribute to the development of a more informed public. These factors improve the overall efficacy of public participation, strengthening the link between project development and environmental assessment in a manner consistent with the original intent of NEPA.

  7. Habitat Evaluation: Guidance for the Review of Environmental Impact Assessment Documents

    Broader source: Energy.gov [DOE]

    This Environmental Protection Agency document is designed to assist NEPA reviewers in evaluation the ecological risks associated with the impacts of federal activities.

  8. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  9. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    SciTech Connect (OSTI)

    Li, Wei Xie, Yuanbo Hao, Fanghua

    2014-04-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision-making structures in China. It offers the potential for delivering timely and quality results to decision-making processes. To achieve the desired efficiency, it is recommended that an SEA procedure take into account findings acquired from an improved RIAM application at an early stage, then, at a later stage, results from more comprehensive assessments conducted using more sophisticated methods should be added, if time and data are available. - Highlights: • RIAM is a potential SEA tool due to its multidisciplinary setting and rapid process. • Weighting index and computing IES are raised for improving RIAM when applied to SEAs. • The improved RIAM boosts SEA effectiveness by timely responding to decision-making. • The improved RIAM is more suitable to an SEA bothered by tight time or data shortage. • The improved RIAM adapts to the technical aims of SEA and decision features in China.

  10. Environmental Impact Statement Explained

    Broader source: Energy.gov [DOE]

    The National Environmental Policy Act (NEPA) requires Federal agencies to prepare an Environmental Impact Statement (EIS) for all major Federal actions that may significantly affect the quality of...

  11. Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products

    Broader source: Energy.gov [DOE]

    This March 28, 2013 webcast reviewed DOE's recently completed three-part study of the life-cycle energy and environmental impacts of LED lighting products relative to incandescent and CFL...

  12. Environmental Assessment and Finding of No Significant Impact: Implementation of the Wetland Mitigation Bank Program at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-04-28

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  13. Nuclear Risk Assessment for the Mars 2020 Mission Environmental Impact Statement

    SciTech Connect (OSTI)

    Clayton, Daniel J.; Bignell, John; Jones, Christopher A.; Rohe, Daniel P.; Flores, Gregg J.; Bartel, Timothy J.; Gelbard, Fred; Le, San; Morrow, Charles W.; Potter, Donald L.; Young, Larry W.; Bixler, Nathan E.; Lipinski, Ronald J.

    2014-01-01

    In the summer of 2020, the National Aeronautics and Space Administration (NASA) plans to launch a spacecraft as part of the Mars 2020 mission. One option for the rover on the proposed spacecraft uses a Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) to provide continuous electrical and thermal power for the mission. An alternative option being considered is a set of solar panels for electrical power with up to 80 Light-Weight Radioisotope Heater Units (LWRHUs) for local component heating. Both the MMRTG and the LWRHUs use radioactive plutonium dioxide. NASA is preparing an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act. The EIS will include information on the risks of mission accidents to the general public and on-site workers at the launch complex. This Nuclear Risk Assessment (NRA) addresses the responses of the MMRTG or LWRHU options to potential accident and abort conditions during the launch opportunity for the Mars 2020 mission and the associated consequences. This information provides the technical basis for the radiological risks of both options for the EIS.

  14. Environmental impact assessment for a radioactive waste facility: A case study

    SciTech Connect (OSTI)

    Devgun, J.S.

    1990-01-01

    A 77-ha site, known as the Niagara Falls Storage Site and located in northwestern New York State, holds about 190, 000 m{sup 3} of soils, wastes, and residues contaminated with radium and uranium. The facility is owned by the US Department of Energy. The storage of residues resulting from the processing of uranium ores started in 1944, and by 1950 residues from a number of plants were received at the site. The residues, with a volume of about 18,000 m{sup 3}, account for the bulk of the radioactivity, which is primarily due to Ra-226; because of the extraction of uranium from the ore, the amount of uranium remaining in the residues is quite small. An analysis of the environmental impact assessment and environmental compliance actions taken to date at this site and their effectiveness are discussed. This case study provides an illustrative example of the complexity of technical and nontechnical issues for a large radiative waste facility. 11 refs., 7 figs., 2 tabs.

  15. Ethical implications of democratic theory for U.S. public participation in environmental impact assessment

    SciTech Connect (OSTI)

    Hourdequin, Marion; Landres, Peter; Hanson, Mark J.; Craig, David R.

    2012-07-15

    Traditional mechanisms for public participation in environmental impact assessment under U.S. federal law have been criticized as ineffective and unable to resolve conflict. As these mechanisms are modified and new approaches developed, we argue that participation should be designed and evaluated not only on practical grounds of cost-effectiveness and efficiency, but also on ethical grounds based on democratic ideals. In this paper, we review and synthesize modern democratic theory to develop and justify four ethical principles for public participation: equal opportunity to participate, equal access to information, genuine deliberation, and shared commitment. We then explore several tensions that are inherent in applying these ethical principles to public participation in EIA. We next examine traditional NEPA processes and newer collaborative approaches in light of these principles. Finally, we explore the circumstances that argue for more in-depth participatory processes. While improved EIA participatory processes do not guarantee improved outcomes in environmental management, processes informed by these four ethical principles derived from democratic theory may lead to increased public engagement and satisfaction with government agency decisions. - Highlights: Black-Right-Pointing-Pointer Four ethical principles based on democratic theory for public participation in EIA. Black-Right-Pointing-Pointer NEPA and collaboration offer different strengths in meeting these principles. Black-Right-Pointing-Pointer We explore tensions inherent in applying these principles. Black-Right-Pointing-Pointer Improved participatory processes may improve public acceptance of agency decisions.

  16. Environmental assessment

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties, New Mexico) will supply additional electric power to the Waste Isolation Pilot Plant (WIPP) and involve construction of a new electric substation at WIPP. This would provide a redundant electrical power source to WIPP. A finding of no significant impact is made.

  17. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  18. EA-1008: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1008: Final Environmental Assessment EA-1008: Final Environmental Assessment Continued ... Environmental Assessment EA-1236: Finding of No Significant Impact EA-1956: Final

  19. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  20. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  1. Recommendations for the Preparation of Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition This second edition of the "Green Book" was issued by DOE to ...

  2. EA-1535: Final Programmatic Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Programmatic Environmental Assessment EA-1535: Final Programmatic Environmental ... More Documents & Publications EA-1535: Finding of No Significant Impact EA-1037: ...

  3. Comparative environmental impact and efficiency assessment of selected hydrogen production methods

    SciTech Connect (OSTI)

    Ozbilen, Ahmet Dincer, Ibrahim Rosen, Marc A.

    2013-09-15

    The environmental impacts of various hydrogen production processes are evaluated and compared, considering several energy sources and using life cycle analysis. The results indicate that hydrogen produced by thermochemical water decomposition cycles are more environmentally benign options compared to conventional steam reforming of natural gas. The nuclear based four-step Cu–Cl cycle has the lowest global warming potential (0.559 kg CO{sub 2}-eq per kg hydrogen production), mainly because it requires the lowest quantity of energy of the considered processes. The acidification potential results show that biomass gasification has the highest impact on environment, while wind based electrolysis has the lowest. The relation is also investigated between efficiency and environmental impacts. -- Highlights: • Environmental performance of nuclear-based hydrogen production is investigated. • The GWP and AP results are compared with various hydrogen production processes. • Nuclear based 4-step Cu–Cl cycle is found to be an environmentally benign process. • Wind-based electrolysis has the lowest AP value.

  4. Local governments' efforts to implement environmental impact assessment requirements on development activities: Cause and effect in North Carolina

    SciTech Connect (OSTI)

    Spangler, J.A. )

    1993-01-01

    Various government entities in North Carolina have seen the need to implement specific policy which requires organizations responsible for certain development activities to perform a detailed assessment of comprehensive environmental impacts. Some governments have enacted policy, and a number of others are evaluating the need for policy implementation. The consideration of environmental effects of the development action early in the project planning process is, in many cases, an effect of the implementation of such policies, rather than a purpose. This study evaluates the varying ideals and rationale upon which local leaders have based environmental policies. Also, this study assesses the effectiveness of a variety of policies currently enacted and compares the final results of projects which have had to comply with the policies. Through the use of a survey distributed to officials responsible for policy enactment, local government personnel responsible for implementation and others involved in both public and private development, a relative assessment of effectiveness of different policies is postulated.

  5. Environmental impact assessment of solid waste management in Beijing City, China

    SciTech Connect (OSTI)

    Zhao Yan; Christensen, Thomas H.; Lu Wenjing; Wu Huayong; Wang Hongtao

    2011-04-15

    The environmental impacts of municipal solid waste management in Beijing City were evaluated using a life-cycle-based model, EASEWASTE, to take into account waste generation, collection, transportation, treatment/disposal technologies, and savings obtained by energy and material recovery. The current system, mainly involving the use of landfills, has manifested significant adverse environmental impacts caused by methane emissions from landfills and many other emissions from transfer stations. A short-term future scenario, where some of the landfills (which soon will reach their capacity because of rising amount of waste in Beijing City) are substituted by incinerators with energy recovery, would not result in significant environmental improvement. This is primarily because of the low calorific value of mixed waste, and it is likely that the incinerators would require significant amounts of auxiliary fuels to support combustion of wet waste. As for the long-term future scenario, efficient source separation of food waste could result in significant environmental improvements, primarily because of increase in calorific value of remaining waste incinerated with energy recovery. Sensitivity analysis emphasized the importance of efficient source separation of food waste, as well as the electricity recovery in incinerators, in order to obtain an environmentally friendly waste management system in Beijing City.

  6. Facility Environmental Vulnerability Assessment

    SciTech Connect (OSTI)

    Van Hoesen, S.D.

    2001-07-09

    From mid-April through the end of June 2001, a Facility Environmental Vulnerability Assessment (FEVA) was performed at Oak Ridge National Laboratory (ORNL). The primary goal of this FEVA was to establish an environmental vulnerability baseline at ORNL that could be used to support the Laboratory planning process and place environmental vulnerabilities in perspective. The information developed during the FEVA was intended to provide the basis for management to initiate immediate, near-term, and long-term actions to respond to the identified vulnerabilities. It was expected that further evaluation of the vulnerabilities identified during the FEVA could be carried out to support a more quantitative characterization of the sources, evaluation of contaminant pathways, and definition of risks. The FEVA was modeled after the Battelle-supported response to the problems identified at the High Flux Beam Reactor at Brookhaven National Laboratory. This FEVA report satisfies Corrective Action 3A1 contained in the Corrective Action Plan in Response to Independent Review of the High Flux Isotope Reactor Tritium Leak at the Oak Ridge National Laboratory, submitted to the Department of Energy (DOE) ORNL Site Office Manager on April 16, 2001. This assessment successfully achieved its primary goal as defined by Laboratory management. The assessment team was able to develop information about sources and pathway analyses although the following factors impacted the team's ability to provide additional quantitative information: the complexity and scope of the facilities, infrastructure, and programs; the significantly degraded physical condition of the facilities and infrastructure; the large number of known environmental vulnerabilities; the scope of legacy contamination issues [not currently addressed in the Environmental Management (EM) Program]; the lack of facility process and environmental pathway analysis performed by the accountable line management or facility owner; and poor facility and infrastructure drawings. The assessment team believes that the information, experience, and insight gained through FEVA will help in the planning and prioritization of ongoing efforts to resolve environmental vulnerabilities at UT-Battelle--managed ORNL facilities.

  7. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    39: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan ...

  8. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  9. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  10. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  11. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  12. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  13. Environmental Risk Assessment

    Broader source: Energy.gov [DOE]

    PPPO subject-matter experts analyze possible environmental hazards and provide risk assessment information to help inform various environmental decision-making processes.

  14. EA-1451: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    51: Final Environmental Assessment EA-1451: Final Environmental Assessment Leasing of Facilities and Equipment to USEC Inc. The USEC EA analyzes the potential environmental impacts ...

  15. EA-1262: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    62: Final Environmental Assessment EA-1262: Final Environmental Assessment McKay Bypass Canal Extension This EA evaluates the environmental impacts for the proposal to extend the ...

  16. EA-1093: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1093: Final Environmental Assessment Surface Water Drainage System This EA evaluates the environmental impacts of the proposal to correct ...

  17. EIS-0290: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential ...

  18. Surface water drainage system. Environmental assessment and finding of no significant impact

    SciTech Connect (OSTI)

    1996-05-01

    This Environmental Assessment (EA) is written pursuant to the National Environmental Policy Act (NEPA). The document identifies and evaluates the action proposed to correct deficiencies in, and then to maintain, the surface water drainage system serving the Department of Energy`s Rocky Flats Environmental Technology Site (Site), located north of Golden, Colorado. Many of the activities proposed would not normally be subject to this level of NEPA documentation. However, in many cases, maintenance of the system has been deferred to the point that wetlands vegetation has become established in some ditches and culverts, creating wetlands. The proposed activities would damage or remove some of these wetlands in order to return the drainage system to the point that it would be able to fully serve its intended function - stormwater control. The Department of Energy (DOE) regulations require that activities affecting environmentally sensitive areas like wetlands be the subject of an EA. Most portions of the surface water drainage system are presently inadequate to convey the runoff from a 100-year storm event. As a result, such an event would cause flooding across much of the Site and possibly threaten the integrity of the dams at the terminal ponds. Severe flooding would not only cause damage to facilities and equipment, but could also facilitate the transport of contaminants from individual hazardous substance sites (IHSSs). Uncontrolled flow through the A- and B-series ponds could cause contaminated sediments to become suspended and carried downstream. Additionally, high velocity flood flows significantly increase erosion losses.

  19. Environmental Assessment and Finding of No Significant Impact: Wind Energy Center Edgeley/Kulm Project, North Dakota

    SciTech Connect (OSTI)

    N /A

    2003-04-15

    The proposed Edgeley/Kulm Project is a 21-megawatt (MW) wind generation project proposed by Florida Power and Light (FPL) Energy North Dakota Wind LLC (Dakota Wind) and Basin Electric Power Cooperative (Basin). The proposed windfarm would be located in La Moure County, south central North Dakota, near the rural farming communities of Kulm and Edgeley. The proposed windfarm is scheduled to be operational by the end of 2003. Dakota Wind and other project proponents are seeking to develop the proposed Edgeley/Kulm Project to provide utilities and, ultimately, electric energy consumers with electricity from a renewable energy source at the lowest possible cost. A new 115-kilovolt (kV) transmission line would be built to transmit power generated by the proposed windfarm to an existing US Department of Energy Western Area Power Administration (Western) substation located near Edgeley. The proposed interconnection would require modifying Western's Edgeley Substation. Modifying the Edgeley Substation is a Federal proposed action that requires Western to review the substation modification and the proposed windfarm project for compliance with Section 102(2) of the National Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4332, and Department of Energy NEPA Implementing Procedures (10 CFR Part 1021). Western is the lead Federal agency for preparation of this Environmental Assessment (EA). The US Fish and Wildlife Service (USFWS) is a cooperating agency with Western in preparing the EA. This document follows regulation issued by the Council on Environmental Quality (CEQ) for implementing procedural provisions of NEPA (40 CFR 1500-1508), and is intended to disclose potential impacts on the quality of the human environment resulting from the proposed project. If potential impacts are determined to be significant, preparation of an Environmental Impact Statement would be required. If impacts are determined to be insignificant, Western would complete a Finding of No Significant Impact (FONSI). Environmental protection measures that would be included in the design of the proposed project are included.

  20. Assessing the Thermal Environmental Impacts of an Groundwater Heat Pump in Southeastern Washington State

    SciTech Connect (OSTI)

    Freedman, Vicky L.; Waichler, Scott R.; Mackley, Rob D.; Horner, Jacob A.

    2012-04-01

    A thermal analysis of a large-scale (e.g., 1900 gpm), open-loop ground source heat pump (GSHP) installed on the Pacific Northwest National Laboratory (PNNL) campus in southeastern Washington State has been performed using a numerical modeling approach. Water temperature increases at the upgradient extraction wells in the system and at the downgradient Columbia River are potential concerns, especially since heat rejection to the subsurface will occur year-round. Hence, thermal impacts of the open-loop GSHP were investigated to identify operational scenarios that minimized downgradient environmental impacts at the river, and upgradient temperature drift at the production wells. Simulations examined the sensitivity of the system to variations in pumping rates and injected water temperatures, as well as to hydraulic conductivity estimates of the aquifer. Results demonstrated that both downgradient and upgradient thermal impacts were more sensitive to injection flow rates than estimates of hydraulic conductivity. Higher injection rates at lower temperatures resulted in higher temperature increases at the extraction wells but lower increases at the river. Conversely, lower pumping rates and higher injected water temperatures resulted in a smaller temperature increase at the extraction wells, but higher increases at the river. The scenario with lower pumping rates is operationally more efficient, but does increase the likelihood of a thermal plume discharging into the Columbia River. However, this impact would be mitigated by mixing within the hyporheic zone and the Columbia River. The impact under current operational conditions is negligible, but future increases in heat rejection could require a compromise between maximizing operational efficiency and minimizing temperature increases at the shoreline.

  1. Environmental impact report (draft)

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  2. Programmatic Environmental Impact Statement for Ground Water...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground ...

  3. EIS-0459: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Programmatic Environmental Impact Statement EIS-0459: Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement DOE ...

  4. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  5. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD May 11, 2016

  6. Environmental assessment and finding of no significant impact: Biorecycling Technologies, Inc., Noble Biogas and Fertilizer Plant, Fresno County, California

    SciTech Connect (OSTI)

    1997-09-01

    The US Department of Energy (DOE) is considering a proposal from the California Energy Commission for partial funding up to $1,500,000 of the construction of the biorecycling Technologies, Inc., (BTI) Noble Biogas and Fertilizer Plant in Fresno County, California. BTI along with its contractors and business partners would develop the plant, which would use manure and green waste to produce biogas and a variety of organic fertilizer products. The California Energy Commission has requested funding from the DOE Commercialization Ventures program to assist in the construction of the plant, which would produce up to one megawatt of electricity by burning biogas in a cogeneration unit. The purpose of this environmental assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with funding development of the proposed project.

  7. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  8. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 29, 2011 EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric Drive Vehicle Battery and Component Manufacturing...

  9. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 EA-1812: Finding of No Significant Impact Haxtun Wind Energy Project, Logan and Phillips Counties, CO January 20, 2012 EA-1812: Final Environmental Assessment Haxtun Wind...

  10. Environmental Assessments | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessments DOE/EA-1976 Emera CNG, LLC, Compressed Natural Gas Project, Port of Palm Beach, City of Riviera Beach, Palm Beach County, FL Final Environmental Assessment (Oct 2015) Finding of No Significant Impact (Oct 2015) DOE/EA-1616A: National Carbon Capture Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, AL Final Environmental Assessment (Aug 2014) Finding of No Significant Impact (Aug 2014) DOE/EA-1616: Environmental Assessment for Proposed

  11. EA-1984: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory This Final EA evaluates the impacts of...

  12. EA-1115: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Assessment EA-1115: Final Environmental Assessment Liquid Waste Treatment at the Nevada Test Site, Nye County, Nevada This EA evaluates the environmental impacts of the proposal to...

  13. EA-1952: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1952: Final Environmental Assessment Lane-Wendson No. 1 ... More Documents & Publications EA-1952: Finding of No Significant Impact EA-1952: Draft

  14. EA-1976: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1976: Final Environmental Assessment Emera CNG, LLC ... More Documents & Publications EA-1976: Finding of No Significant Impact EA-1976D: Draft ...

  15. EA-1037: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    37: Final Environmental Assessment EA-1037: Final Environmental Assessment Uranium Lease ... EA-1535: Finding of No Significant Impact EIS-0472: Notice of Intent to Prepare a ...

  16. EA-1922: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a ... EA-1922: Draft Environmental Assessment EA-1922: Finding of No Significant Impact

  17. EA-1818: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Assessment EA-1818: Final Environmental Assessment Pettisville ... More Documents & Publications EA-1818: Finding of No Significant Impact EA-1820: Final ...

  18. EA-1927: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1927: Final Environmental Assessment Paducah Gaseous ... for Potential Land and Facilities Transfers EA-1927: Finding of No Significant Impact

  19. EA-1900: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment EA-1900: Notice of Availability of a ... of a Final Environmental Assessment and Finding of No Significant Impact

  20. EA-1804: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Final Environmental Assessment EA-1804: Final Environmental Assessment Sauk Valley ... The activities are associated with the Proposed Project and do not significantly impact ...

  1. EA-2036: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2036: Final Environmental Assessment Sabine Pass ... More Documents & Publications EA-2036: Finding of No Significant Impact SEMI-ANNUAL ...

  2. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  3. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021, also is described. (4) Affected Environment. This section provides a brief description of the locale in which the Proposed Action would take place. (5) Environmental Impacts. This section describes the range of environmental impacts, beneficial and adverse, of the Proposed Action. Impacts of alternatives briefly are discussed. (6) Permits and Regulatory Requirements. This section provides a brief description of permits and regulatory requirements for the Proposed Action. (7) Organizations Consulted. This section lists any outside groups, agencies, or individuals contacted as part of the environmental assessment preparation and/or review. (8) References. This section provides a list of documents used to contribute information or data in preparation of this environmental assessment.

  4. Micronucleus frequency and hematologic index in Colossoma macropomum (Pisces, Ariidae) for environmental impact assessment at a protected area in Brazil

    SciTech Connect (OSTI)

    Sousa, Debora Batista Pinheiro; Neta, Raimunda Nonata Fortes Carvalho

    2014-10-06

    This study used micronucleus assays and erythrocyte indices in the freshwater fish tambaqui, Colossoma macropomum, to assess environmental impacts in the Environmental Protection Area at MaracanĂŁ, SĂŁo Luis, Brazil. Fish were sampled from two locations within the protected area, Serena Lagoon and Ambude River, on four occasions. Biometric data (length and weight) and an aliquot of blood were collected from each fish for analysis. Erythrocyte indices including: mean corpuscular volume, mean corpuscular hemoglobin and mean corpuscular hemoglobin concentration were calculated, and blood samples were examined for micronuclei and nuclear morphological changes. Micronuclei were found in fish from both locations, although the frequency was higher in fish from Ambude River. Nuclear morphological changes were identified only in fish collected from Ambude River. Several nuclear morphological changes were found in erythrocytes stained with Giemsa, including: micronuclei and binucleate nuclei. On average, erythrocyte indices were lower in fish collected from Ambude River than in those from Serena Lagoon. Our results indicate that micronuclei and erythrocyte indices can be used in C. macropomum as indicators of environmental health.

  5. DOEEA-0984 Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEEA-0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon

  6. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  7. Environmental Impact of Smart Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) of NEPA for a proposed major Federal action significantly affecting the quality of the human environment. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 2016 EIS-0525: Draft Programmatic Environmental Impact Statement

  8. Final environmental impact assessment of the Paducah Gaseous Diffusion Plant site, Paducah, Kentucky

    SciTech Connect (OSTI)

    Not Available

    1982-08-01

    This document considers: the need for uranium enrichment facilities; site location; plant description; and describes the power generating facilities in light of its existing environment. The impacts from continuing operations are compared with alternatives of shutdown, relocation, and alternative power systems. (PSB)

  9. Environmental assessment, finding of no significant impact, and response to comments. Radioactive waste storage

    SciTech Connect (OSTI)

    1996-04-01

    The Department of Energy`s (DOE) Rocky Flats Environmental Technology Site (the Site), formerly known as the Rocky Flats Plant, has generated radioactive, hazardous, and mixed waste (waste with both radioactive and hazardous constituents) since it began operations in 1952. Such wastes were the byproducts of the Site`s original mission to produce nuclear weapons components. Since 1989, when weapons component production ceased, waste has been generated as a result of the Site`s new mission of environmental restoration and deactivation, decontamination and decommissioning (D&D) of buildings. It is anticipated that the existing onsite waste storage capacity, which meets the criteria for low-level waste (LL), low-level mixed waste (LLM), transuranic (TRU) waste, and TRU mixed waste (TRUM) would be completely filled in early 1997. At that time, either waste generating activities must cease, waste must be shipped offsite, or new waste storage capacity must be developed.

  10. Final Environmental Impact Statement for Construction and Operation...

    Office of Environmental Management (EM)

    FIGURE S-7 Areas of Potential Impact Evaluated for Each ... This EIS assesses the potential environmental impacts from ... activities consistent with current plans and procedures. ...

  11. Final Environmental Impact Statement for Construction and Operation...

    Office of Environmental Management (EM)

    FIGURE S-6 Areas of Potential Impact Evaluated for Each ... This EIS assesses the potential environmental impacts from ... activities consistent with current plans and procedures. ...

  12. Environmental Assessment DOE/EA-1405

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    405 Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 2002 U.S. Department of Energy DOE/EA-1405 Environmental Assessment March 2002 This page intentionally left blank. DOE/EA-1405 U.S. Department of Energy Preface Environmental Assessment P-1 March 2002 PREFACE This environmental assessment was prepared to assess potential environmental impacts

  13. Amended Environmental Impact Statement Filing System Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact ...

  14. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) ...

  15. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  16. Ecological function and resilience: Neglected criteria for environmental impact assessment and ecological risk analysis

    SciTech Connect (OSTI)

    Cairns, J. Jr.; Niederlehner, B.R. . Univ. Center for Environmental and Hazardous Materials Studies)

    1993-01-01

    The importance of establishing methods for determining ecological function and resilience transcends scientific interest; these methods are important to sustained societal use of ecosystems and long-term productivity. Essential services that ecosystems provide to human society include water purification, oxygen production, carbon storage, climate regulation, and production of food, wood, and medicinal drugs. Although man is dependent upon these services, human understanding of the dynamics of ecosystem function is limited. Man can detect gross impairment of ecosystem function or resilience after the fact. However, protecting ecosystem health necessitates detecting adverse trends in ecological function, rather than reacting when the system collapses. The information to date is inadequate for predicting subtle changes or incremental trends. Once ecosystems are damaged and therefore providing diminished services, it is important to determine when they will be restored to an approximation of their predisturbance condition. For those ecosystems unlikely to recover on their own, management techniques may enhance recovery processes. Information about response of ecosystem function to human actions and relative resilience of alternative ecosystems can facilitate decision-making under the National Environmental Policy Act (NEPA).

  17. EA-1391: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources

  18. EA-1207: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

  19. Environmental Impact Statement Checklist (DOE, 1997) | Department of Energy

    Energy Savers [EERE]

    Checklist (DOE, 1997) Environmental Impact Statement Checklist (DOE, 1997) This DOE Environmental Impact Statement Checklist is provided to assist EIS preparers and reviewers in meeting the requirements of the National Environmental Policy Act (NEPA). PDF icon Environmental Impact Statement Checklist More Documents & Publications Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition (DOE, 2004) 40 CFR 1500-1508: CEQ Regulations

  20. EA-0531: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-0531: Final Environmental Assessment Proposed Natural Gas Protection Program for Naval Oil Shale Reserves Nos. 1 and 3 This EA evaluates the environmental impacts of a proposal ...

  1. EA-1002: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1002: Final Environmental Assessment Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project This EA evaluates the environmental impacts of the U.S. ...

  2. DOE/EA-1494 Final Environmental Assessment for Activities Using

    National Nuclear Security Administration (NNSA)

    ... 1993. Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements ("Green Book"), U.S. Department of Energy, Office of NEPA Oversight. ...

  3. EIS-0481: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic...

  4. Life cycle assessment of urban waste management: Energy performances and environmental impacts. The case of Rome, Italy

    SciTech Connect (OSTI)

    Cherubini, Francesco Bargigli, Silvia; Ulgiati, Sergio

    2008-12-15

    Landfilling is nowadays the most common practice of waste management in Italy in spite of enforced regulations aimed at increasing waste pre-sorting as well as energy and material recovery. In this work we analyse selected alternative scenarios aimed at minimizing the unused material fraction to be delivered to the landfill. The methodological framework of the analysis is the life cycle assessment, in a multi-method form developed by our research team. The approach was applied to the case of municipal solid waste (MSW) management in Rome, with a special focus on energy and material balance, including global and local scale airborne emissions. Results, provided in the form of indices and indicators of efficiency, effectiveness and environmental impacts, point out landfill activities as the worst waste management strategy at a global scale. On the other hand, the investigated waste treatments with energy and material recovery allow important benefits of greenhouse gas emission reduction (among others) but are still affected by non-negligible local emissions. Furthermore, waste treatments leading to energy recovery provide an energy output that, in the best case, is able to meet 15% of the Rome electricity consumption.

  5. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 14, 2011 EA-1814: Final Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System July 13, 2011 EA-1871: Finding of No Significant Impact...

  6. Site-wide Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWEIS Site-wide Environmental Impact Statement We analyze the potential environmental impacts associated with Laboratory operations and facilities. Contact Environmental...

  7. Environmental Impact Statements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance Environmental Impact Statements Environmental Impact Statements The documents included on the Environmental Compliance Division webpages have been posted to comply ...

  8. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer, Arthur S. Rood, A. Jeffrey Sondrup

    2011-12-23

    Groundwater impacts have been analyzed for the proposed remote-handled low-level waste disposal facility. The analysis was prepared to support the National Environmental Policy Act environmental assessment for the top two ranked sites for the proposed disposal facility. A four-phase screening and analysis approach was documented and applied. Phase I screening was site independent and applied a radionuclide half-life cut-off of 1 year. Phase II screening applied the National Council on Radiation Protection analysis approach and was site independent. Phase III screening used a simplified transport model and site-specific geologic and hydrologic parameters. Phase III neglected the infiltration-reducing engineered cover, the sorption influence of the vault system, dispersion in the vadose zone, vertical dispersion in the aquifer, and the release of radionuclides from specific waste forms. These conservatisms were relaxed in the Phase IV analysis which used a different model with more realistic parameters and assumptions. Phase I screening eliminated 143 of the 246 radionuclides in the inventory from further consideration because each had a half-life less than 1 year. An additional 13 were removed because there was no ingestion dose coefficient available. Of the 90 radionuclides carried forward from Phase I, 57 radionuclides had simulated Phase II screening doses exceeding 0.4 mrem/year. Phase III and IV screening compared the maximum predicted radionuclide concentration in the aquifer to maximum contaminant levels. Of the 57 radionuclides carried forward from Phase II, six radionuclides were identified in Phase III as having simulated future aquifer concentrations exceeding maximum contaminant limits. An additional seven radionuclides had simulated Phase III groundwater concentrations exceeding 1/100th of their respective maximum contaminant levels and were also retained for Phase IV analysis. The Phase IV analysis predicted that none of the thirteen remaining radionuclides would exceed the maximum contaminant levels for either site location. The predicted cumulative effective dose equivalent from all 13 radionuclides also was less than the dose criteria set forth in Department of Energy Order 435.1 for each site location. An evaluation of composite impacts showed one site is preferable over the other based on the potential for commingling of groundwater contamination with other facilities.

  9. EA-1846: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    6: Final Environmental Assessment EA-1846: Final Environmental Assessment Demonstration of Carbon Dioxide Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production, Jefferson and Brazoria Counties, Texas PDF icon EA-1846-FEA-2011.pdf More Documents & Publications EIS-0464: Draft Environmental Impact Statement EIS-0464: Final Environmental Impact Statement EIS-0464: Record of Decision

  10. EA-1958: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Assessment EA-1958: Final Environmental Assessment Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington This EA evaluates the potential environmental impacts of constructing and operating these proposed facilities and/or additions and proposed infrastructure, including impacts on land use, air quality, water quality, geological resources, biological resources,

  11. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  12. DOE Issues Finding of No Significant Impact and Final Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment on Road Project U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release Thursday August 12, 2010 DOE Issues Finding of No Significant Impact and Final Environmental Assessment on Road Project The U.S. Department of Energy has issued a Finding of No Significant Impact stemming from an environmental assessment it performed to examine the potential environmental impacts of building an internal road to safely ship

  13. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2003-03-13

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  14. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    New England Clean Power Link, Vermont DOE announces its intent to prepare an EIS to assess the potential environmental impacts of granting a Presidential permit to construct,...

  15. EIS-0349: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic...

  16. DOE issues Finding of No Significant Impact for the Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues ...

  17. Environmental Impacts of Smart Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research & Development » Environmental Impacts and Siting of Wind Projects Environmental Impacts and Siting of Wind Projects A trained falcon, equipped with a GPS and a VHF tracker, gathers radar data that is helping scientists improve bird detection technologies at wind facilities. A trained falcon, equipped with a GPS and a VHF tracker, gathers radar data that is helping scientists improve bird detection technologies at wind facilities. The Wind Program works to remove barriers to wind

  18. Live Fire Range Environmental Assessment

    SciTech Connect (OSTI)

    1993-08-01

    The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  19. PRIVACY IMPACT ASSESSMENT: Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY

  20. PRIVACY IMPACT ASSESSMENT: Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE

  1. Documentation of cumulative impacts in environmental impact statements

    SciTech Connect (OSTI)

    Cooper, T.A.; Canter, L.W.

    1997-11-01

    The National Environmental Policy Act (NEPA) of 1969 and the Council on Environmental Quality (CEQ) regulations in the United States require federal agencies to apply an environmental impact assessment (EIA) in decision-making related to their actions. One aspect requires an examination of direct, indirect and cumulative impacts (CIs). Historically, cumulative impact assessment (CIA) has been given limited attention in EIA and resultant environmental impact statements (EISs), not because of its lack of importance, but owing to limitations in methodologies and procedures, including documentation consistency. The objectives of this study were to identify deficiencies in the documentation of CIs and CIA in EISs and to formulate appropriate recommendations (potential solutions) related to such deficiencies. The study involved the systematic review of 33 EISs. The results indicate that improvements have been made in documentation practices since 1990; however, inconsistencies and inadequacies still exist. Therefore, the following recommendations were developed: (1) CIs should be reported in a separate part of the Environmental Consequences section, and they should be addressed for each pertinent environmental resource; (2) a summary of CIs should be included; (3) any CIs considered not significant should be mentioned plus the reason(s) for their non-significance; (4) spatial and temporal boundaries addressed within the CIA process should be defined for pertinent environmental resources; and (5) utilized guidelines and methodologies should be described.

  2. EIS-0386: Draft Programmatic Environmental Impact Statement ...

    Office of Environmental Management (EM)

    Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact ... would continue under current agency procedures for granting rights-of-way. ...

  3. Pollution Prevention - Environmental Impact Reduction Checklists...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pollution Prevention - Environmental Impact Reduction Checklists for NEPA309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA309 Reviewers The ...

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  5. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 1, 2012 EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR February 8, 2012 EIS-0476: Final Environmental Impact...

  6. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 1999 EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan April 1, 1999...

  7. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  8. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  9. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  10. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  11. Waste Management Programmatic Environmental Impact Statement...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) ...

  12. Environmental Impact Statement Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Environmental Impact Statement Summary This DOE guidance is intended to help EIS preparers draft the EIS summary. PDF icon Environmental Impact Statement Summary More...

  13. EIS-0310: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, ...

  14. EIS-0396: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear ...

  15. EIS-0515: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Supplemental Draft Environmental Impact Statement EIS-0515: Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, ...

  16. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  17. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  18. EIS-0472: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0472: Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, ...

  19. Benchmarking performance: Environmental impact statements in Egypt

    SciTech Connect (OSTI)

    Badr, El-Sayed A.; Zahran, Ashraf A.; Cashmore, Matthew

    2011-04-15

    Environmental impact assessment (EIA) was formally introduced in Egypt in 1994. This short paper evaluates 'how well' the EIA process is working in practice in Egypt, by reviewing the quality of 45 environmental impact statements (EISs) produced between 2000 and 2007 for a variety of project types. The Lee and Colley review package was used to assess the quality of the selected EISs. About 69% of the EISs sampled were found to be of a satisfactory quality. An assessment of the performance of different elements of the EIA process indicates that descriptive tasks tend to be performed better than scientific tasks. The quality of core elements of EIA (e.g., impact prediction, significance evaluation, scoping and consideration of alternatives) appears to be particularly problematic. Variables that influence the quality of EISs are identified and a number of broad recommendations are made for improving the effectiveness of the EIA system.

  20. EA-1956: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

  1. DEISCODES. For Environmental Impact Statements

    SciTech Connect (OSTI)

    Widmayer, D.A. [U.S. NRC, Office of Material Safety and Safegaurds, Washington, D.C., (United States)

    1983-01-01

    DEISCODES, the Draft Environmental Impact Statement CODES are five separate FORTRAN codes used to perform the analysis in the Draft Environmental Impact Statement written to support 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste. The five codes are named OPTIONS, GRWATER, INTRUDE, INVERSW, and INVERSI. These codes calculate impact measures associated with the management of Low-Level radioactive Waste (LLW). Three phases of waste management are considered: waste processing, transportation, and disposal, utilizing (1) information on waste characteristics, (2) data and assumptions on disposal technologies and (3) impact calculational methodologies presented in NUREG/CR-1759 and NUREG-0782. The INTRUDE code determines the radiological impacts resulting from potential inadvertent human intrusion into a selected disposal facility containing processed waste as a function of time after disposal. GRWATER calculates the individual exposures resulting from use of contaminated water drawn from various human access locations such as a well that may become contaminated as a result of potential groundwater migration or radionuclides. The OPTIONS code calculates the waste volume-averaged inadvertent intruder impacts, impacts resulting from exposed waste scenarios, as well as those resulting from operational accidents, and those associated with short term consideration such as waste processing and transportation impacts, disposal costs, energy use, land use, etc. INVERSI, calculates the limiting concentrations in waste to meet a specific dose criterion for a disposal facility. INVERSW, calculates disposal facility radionuclide concentrations and inventories to meet specific allowable dose criteria for groundwater migration for the facility design and regionally representative environmental characteristics.

  2. POLICY ISSUES ASSOCIATED WITH USING SIMULATION TO ASSESS ENVIRONMENTAL

    Office of Scientific and Technical Information (OSTI)

    IMPACTS (Other) | SciTech Connect SciTech Connect Search Results Other: POLICY ISSUES ASSOCIATED WITH USING SIMULATION TO ASSESS ENVIRONMENTAL IMPACTS Citation Details In-Document Search Title: POLICY ISSUES ASSOCIATED WITH USING SIMULATION TO ASSESS ENVIRONMENTAL IMPACTS This report examines the relationship between simulation-based science and judicial assessments of simulations or models supporting evaluations of environmental harms or risks, considering both how it exists currently and

  3. Analysis of Environmental Impacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of Environmental Impacts Analysis of Environmental Impacts Selected documents on the Analysis of Environmental Impacts under NEPA. March 12, 2012 Final Guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act (CEQ, 2012) The Council on Environmental Quality is issuing its final guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews under the National Environmental Policy

  4. EA-1611-S1: Draft Supplemental Environmental Assessment | Department...

    Broader source: Energy.gov (indexed) [DOE]

    supplemental EA that assesses the potential environmental impacts of the proposed expansion of Colorado Highlands Wind Project, which interconnects to Western's transmission...

  5. EA-1900: Notice of Availability of a Final Environmental Assessment...

    Office of Environmental Management (EM)

    EA-1900: Notice of Availability of a Final Environmental Assessment and Finding of No Significant Impact Radiological Work and Storage Building at the Knolls Atomic Power ...

  6. Special Resource Study/Environmental Assessment for Manhattan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Special Resource StudyEnvironmental Assessment for Manhattan Project Sites, DOEEA-1868 ... More Documents & Publications EA-1868: Finding of No Significant Impact Microsoft ...

  7. EA-1927: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1927: Draft Environmental Assessment Paducah Gaseous Diffusion Plant Potential Land and ... impacts of the proposed transfer of land and facilities at the Paducah Gaseous ...

  8. Environmental assessment, finding of no significant impact, and response to comments. Sold residue treatment, repackaging, and storage

    SciTech Connect (OSTI)

    1996-04-01

    From its founding in 1952 through the cessation of production in 1989, the United States Department of Energy`s (DOE) Rocky Flats Plant (now the Rocky Flats Environmental Technology Site [the Site]) produced components for nuclear weapons. Some of those components were made of plutonium. As a result of the processes used to recover and purify plutonium and manufacture the components, a variety of materials became contaminated with plutonium. If the level of contamination were low, the material was considered waste. However, if the concentration of plutonium in the material exceeded the {open_quotes}economic discard limit,{close_quotes} the materials were classified as {open_quotes}residue{close_quotes} rather than{open_quotes}Waste{close_quotes} and were stored for later recovery of the plutonium. While large quantities of residues were processed, others, primarily those more difficult to process, accumulated at the Site in storage. Two important events regarding residues have occurred at the Site since production activities ceased. One event was the end of the Cold War in 1991, which made the return to production of nuclear weapons, with their Rocky Flats-made components, unnecessary. This event led to DOE`s decision to permanently cease production at the Site, clean up and remove radioactive and chemical contamination at the Site, and find alternative uses for the Site. This document describes methods for processing of the wastes for safe interim storage. Environmental impacts from the processing and storage are discussed.

  9. EIS-0288: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  10. EIS-0222: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

  11. Site-wide Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWEIS Site-wide Environmental Impact Statement We analyze the potential environmental impacts associated with Laboratory operations and facilities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The Site-wide Environmental Impact Statement forms the backbone of the National Environmental Policy Act documentation for LANL's continued facility operations. Site-wide Environmental Impact Statement The Site-wide

  12. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-12-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  13. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2010-08-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  14. Evaluation of Groundwater Impacts to Support the National Environmental Policy Act Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01

    The groundwater impacts have been analyzed for the proposed RH-LLW disposal facility. A four-step analysis approach was documented and applied. This assessment compared the predicted groundwater ingestion dose to the more restrictive of either the 25 mrem/yr all pathway dose performance objective, or the maximum contaminant limit performance objective. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives. The analysis was prepared to support the NEPA-EA for the top two ranking of the proposed RH-LLW sites. As such, site-specific conditions were incorporated for each set of results generated. These site-specific conditions were included to account for the transport of radionuclides through the vadose zone and through the aquifer at each site. Site-specific parameters included the thickness of vadose zone sediments and basalts, moisture characteristics of the sediments, and aquifer velocity. Sorption parameters (Kd) were assumed to be very conservative values used in Track II analysis of CERCLA sites at INL. Infiltration was also conservatively assumed to represent higher rates corresponding to disturbed soil conditions. The results of this analysis indicate that the groundwater impacts for either proposed facility location are expected to be less than the performance objectives.

  15. Environmental Assessment Checklist (DOE, 1994) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist (DOE, 1994) Environmental Assessment Checklist (DOE, 1994) A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist ...

  16. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Silver Peak Area Geothermal Exploration Project Environmental Assessment, Esmeralda County, NV December 12, 2012 EA-1919: Draft Programmatic Environmental Assessment...

  17. Environmental Assessment Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist Environmental Assessment Checklist A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist More Documents &...

  18. Draft Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    for the Cliffrose Solar Interconnection Project DOEEA-1989 PrePared By dePartment of energy Western area PoWer administration desert southWest region May 2015 DRAFT ENVIRONMENTAL...

  19. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    SciTech Connect (OSTI)

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R&D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

  20. Environmental Assessment and Finding of No Significant Impact: On-Site Treatment of Low Level Mixed Waste

    SciTech Connect (OSTI)

    N /A

    1999-03-22

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1292) to evaluate the proposed treatment of low level mixed waste (LLMW) at the Rocky Flats Environmental Technology Site (Site). The purpose of the action is to treat LLMW in order to meet the Land Disposal Restrictions specified by the Resource Conservation and Recovery Act and the waste acceptance criteria of the planned disposal site(s). Approximately 17,000 cubic meters (m{sup 3}) of LLMW are currently stored at the Site. Another 65,000 m{sup 3}of LLMW are likely to be generated by Site closure activities (a total of 82,000 m{sup 3} of LLMW). About 35,000 m{sup 3} can be directly disposed of off-site without treatment, and most of the remaining 47,000 m{sup 3} of LLMW can be treated at off-site treatment, storage, and disposal facilities. However, some LLMW will require treatment on-site, either because it does not meet shipping requirements or because off-site treatment is not available for these particular types of LLMW. Currently, this LLMW is stored at the Site pending the development and implementation of effective treatment processes. The Site needs to treat this LLMW on-site prior to shipment to off-site disposal facilities, in order to meet the DOE long-term objective of clean up and closure of the Site. All on-site treatment of LLMW would comply with applicable Federal and State laws designed to protect public health and safety and to enhance protection of the environment. The EA describes and analyzes the environmental effects of the proposed action (using ten mobile treatment processes to treat waste on-site), and the alternatives of treating waste onsite (using two fixed treatment processes), and of taking no action. The EA was the subject of a public comment period from February 3 to 24, 1999. No written or other comments regarding the EA were received.

  1. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  2. Environmental Impact Statement | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statements DOE/EIS-0473 - W.A. Parish Post-Combustion CO2 Capture and Sequestration Project Notice of Intent (November 2011) Draft Environmental Impact Statement (September 2012) Final Environmental Impact Statement (February 2013) Record of Decision (May 2013) Mitigation Action Plan (June 2013) DOE/EIS-0464 - Lake Charles CCS Project Notice of Intent (April 2011) Draft Environmental Impact Statement (April 2013) Final Environmental Impact Statement (November 2013) Record of Decision

  3. Environmental assessment: special isotope separation process selection

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Environmental Assessment (EA) evaluates the differences in potential environmental impacts between two plutonium Special Isotope Separation (SIS) technologies: Atomic Vapor Laser Isotope Separation (AVLIS) and Molecular Laser Isotope Separation (MLIS). Both SIS technologies use PuO/sub 2/ as feed; AVLIS converts feed to plutonium metal and MLIS converts feed to PuF/sub 6/. The AVLIS process uses laser energy to selectively photoionize and electrostatically separate plutonium isotopes from an atomic vapor stream. The MLIS process uses laser energy to selectively disassociate specific isotopes of plutonium in the form of PuF/sub 6/ molecules to create PuF/sub 5/ for collection and further processing. Both processes produce plutonium metal as their product. An evaluation of differences in potential environmental impacts attributed to the construction of an SIS facility, based on either technology, included a comparison of construction materials, land areas required, and the size of the design and construction workforce. The differences in potential environmental impacts from operating an SIS facility were also compared. No large differences in potential environmental impacts would be expected from the use of process chemicals. An AVLIS or an MLIS facility would produce operating effluents that would meet all applicable radiation, chemical, and hazardous waste standards and would be constructed to protect workers, the public and the environment. This EA has not revealed any significant differences in the potential environmental impacts that could occur as a result of deploying either the AVLIS or the MLIS Special Isotope Separation technology.

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  5. Solar Progammatic Environmental Impact Statement, Volume 1 |...

    Open Energy Info (EERE)

    Progammatic Environmental Impact Statement, Volume 1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Progammatic Environmental...

  6. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs January 1,...

  7. Pollution Prevention - Environmental Impact Reduction Checklists...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Checklists for NEPA309 Reviewers (EPA, 1995) Pollution Prevention - Environmental Impact Reduction Checklists for NEPA309 Reviewers (EPA, 1995) The environmental review ...

  8. Environmental Impact Statement Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the requirements of the National Environmental Policy Act (NEPA). PDF icon Environmental Impact Statement Checklist More Documents & Publications National Energy Policy Act Guide...

  9. EA-1570: Final Environmental Assessment and Finding of No Significant

    Energy Savers [EERE]

    Impact | Department of Energy Assessment and Finding of No Significant Impact EA-1570: Final Environmental Assessment and Finding of No Significant Impact Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino Appearance Experiment (NOvA) at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota This Environmental Assessment (DOE/EA-1570) provides information and analysis of proposed U.S. Department of Energy activities

  10. NEPA - Environmental Assessments - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessments Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA -

  11. DOE issues Finding of No Significant Impact for the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory | Department of Energy issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory February 28, 2014 - 12:00pm

  12. DOE issues Finding of No Significant Impact for the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory | Department of Energy DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory February 28, 2014 -

  13. Analysis of Environmental Impacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected documents on the Analysis of Environmental Impacts under NEPA. October 3, 1984 Policy and Procedures for the Review of Federal Actions Impacting the Environment This...

  14. Environmental Impacts of Increased Hydroelectric Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impacts of Increased Hydroelectric Development at Existing Dams Environmental Impacts of Increased Hydroelectric Development at Existing Dams This report describes the ...

  15. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon...

  16. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  17. EA-1528: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Final Environmental Assessment EA-1528: Final Environmental Assessment Storage of Tritium-Producing Burnable Absorber RODs in K-Area Transfer Bay at the Savannah River Site The U.S. Department of Energy (DOE) Savannah River Operations Office (SR) and the National Nuclear Security Administration (NNSA) Savannah River Site (SRS) Office prepared this environmental assessment (EA) to analyze the potential environmental impacts of the temporary dry storage of a cask containing Tritium-Producing

  18. EA-2024: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2024: Final Environmental Assessment Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy, National Nuclear Security Administration, has prepared this environmental assessment to evaluate the potential environmental impacts associated with transporting up to 900 kilograms of plutonium from foreign nations to the United States, storing the plutonium at the Savannah River Site in South Carolina, and processing it for

  19. Environmental impacts during geothermal development: Some examples from Central America

    SciTech Connect (OSTI)

    Goff, S.; Goff, F.

    1997-04-01

    The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development.

  20. EIS-0523: Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

  1. EA-1913: Preliminary Environmental Assessment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Preliminary Environmental Assessment EA-1913: Preliminary Environmental Assessment Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho This EA evaluates the ...

  2. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment Silver Peak Area Geothermal Exploration Project, Esmeralda County, NV October 1, 2012 EA-1863: Final Environmental Assessment Vegetation...

  3. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 21, 2014 EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon March 11, 2014 EA-1956: Draft Site-Wide Environmental Assessment...

  4. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment Sauk Valley Community College's Wind Energy Project, Dixon, Lee County, Illinois December 1, 2010 EA-1807: Final Environmental Assessment Heartland...

  5. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado October 20, 2011 EA-1665: Final Environmental Assessment and...

  6. Environmental Assessment and Finding of No Significant Impact: The Nevada Test Site Development Corporations's Desert Rock Sky Park at the Nevada Test Site

    SciTech Connect (OSTI)

    N /A

    2000-03-01

    The United States Department of Energy has prepared an Environmental Assessment (DOE/EA-1300) (EA) which analyzes the potential environmental effects of developing operating and maintaining a commercial/industrial park in Area 22 of the Nevada Test Site, between Mercury Camp and U.S. Highway 95 and east of Desert Rock Airport. The EA evaluates the potential impacts of infrastructure improvements necessary to support fill build out of the 512-acre Desert Rock Sky Park. Two alternative actions were evaluated: (1) Develop, operate and maintain a commercial/industrial park in Area 22 of the Nevada Test Site, and (2) taking no action. The purpose and need for the commercial industrial park are addressed in Section 1.0 of the EA. A detailed description of the proposed action and alternatives is in section 2.0. Section 3.0 describes the affected environment. Section 4.0 the environmental consequences of the proposed action and alternative. Cumulative effects are addressed in Section 5.0. Mitigation measures are addressed in Section 6.0. The Department of Energy determined that the proposed action of developing, operating and maintaining a commercial/industrial park in Area 22 of the Nevada Test Site would best meet the needs of the agency.

  7. Technical support document: Energy efficiency standards for consumer products: Refrigerators, refrigerator-freezers, and freezers including draft environmental assessment, regulatory impact analysis

    SciTech Connect (OSTI)

    1995-07-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended by the National Appliance Energy Conservation Act of 1987 (P.L. 100-12) and by the National Appliance Energy Conservation Amendments of 1988 (P.L. 100-357), and by the Energy Policy Act of 1992 (P.L. 102-486), provides energy conservation standards for 12 of the 13 types of consumer products` covered by the Act, and authorizes the Secretary of Energy to prescribe amended or new energy standards for each type (or class) of covered product. The assessment of the proposed standards for refrigerators, refrigerator-freezers, and freezers presented in this document is designed to evaluate their economic impacts according to the criteria in the Act. It includes an engineering analysis of the cost and performance of design options to improve the efficiency of the products; forecasts of the number and average efficiency of products sold, the amount of energy the products will consume, and their prices and operating expenses; a determination of change in investment, revenues, and costs to manufacturers of the products; a calculation of the costs and benefits to consumers, electric utilities, and the nation as a whole; and an assessment of the environmental impacts of the proposed standards.

  8. Improving landscape-level environmental impact evaluations.

    SciTech Connect (OSTI)

    Walston, L.J.; LaGory, K.E.; Vinikour, W.; Van Lonkhuyzen, R.L.; Cantwell, B.

    2012-04-01

    New spatial data and advancements in GIS tools allow much more comprehensive and quantitative analyses of the large datasets required when making programmatic evaluations of the ecological effects of proposed activities that cover a large area or region. Understanding the environmental impacts of proposed human developments is critical to making appropriate siting decisions and designing mitigation strategies to reduce impacts on important resources. Impact analyses conducted under the National Environmental Policy Act (NEPA) in Environmental Impact Statements (EISs) or Environmental Assessments (EAs) are intended to determine the resource-specific impacts of proposed activities of federal agencies and their alternatives using the best available information. Impacts to ecological resources are often a primary focus of these analyses. Information used in NEPA analyses include some measure of the known or probable presence of plants and wildlife in the project area, with special emphasis placed on threatened, endangered, and other special-status species. Site-specific information pertaining to ecological resources is usually easier to obtain for small-scale activities such as a local facility, road, or transmission upgrade project, where the ability to conduct fieldwork is more often feasible. However, site-specific data is more difficult-and sometimes impossible-to obtain for proposed activities that could affect a large area or region. These types of analyses often are considered in programmatic NEPA documents, in which a federal agency evaluates the implementation of a broad program or plan. Under these programmatic evaluations, the exact location and size of developments are often not known. Because obtaining quantitative information for ecological resources at such large spatial scales is difficult, programmatic impact evaluations typically rely on sketchy or partial information such as recorded species occurrences, species ranges, and general habitat descriptions. However, new spatial data and improved GIS tools allow much more comprehensive and quantitative analyses using large, readily available datasets. The availability of large-scale regional data such as GAP land-cover models or species habitat suitability models, combined with more robust spatial analysis procedures available through ArcGIS for Desktop software, allowed the analysis of multiple datasets at large spatial scales. This enabled researchers to surpass previous qualitative evaluations by developing a more accurate and quantitative approach for determining the environmental impacts of human activities at larger spatial scales. These approaches, combined with the utility of ModelBuilder and operability of Python scripts in ArcGIS, allow a more timely and cost-effective synthesis of available spatial data for programmatic evaluations and add a quantitative basis to environmental decision making.

  9. EA-1340: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    40: Final Environmental Assessment EA-1340: Final Environmental Assessment Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site This EA evaluates the environmental impacts for the proposal to make maximum use of existing U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) facilities to further the scientific missions assigned to the Department of Congress to the extent it can do so without impacting the primary mission of WIPP, the disposal of defense transuranic

  10. EIS-0394: Notice of Intent to Prepare an Environmental Impact...

    Energy Savers [EERE]

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0394: Notice of Intent to Prepare ... and the DOE NEPA implementing procedures (10 CFR part 1021), to assess the ...

  11. DOE issues Finding of No Significant Impact for the Environmental...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE issues Finding of No Significant Impact for the Environmental Assessment on Resumption of Transient Testing of Nuclear Fuels and Materials at Idaho National Laboratory The U.S. ...

  12. EIS-0423: Notice of Intent to Prepare an Environmental Impact...

    Office of Environmental Management (EM)

    EIS-0423: Draft Environmental Impact Statement EIS-0423: Final Environmental Impact Statement EIS-0423-S1: Notice of Intent to Prepare a Supplemental Environmental Impact...

  13. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  14. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  15. EIS-0440: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a ...

  16. EIS-0015: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy PDF icon EIS-0015: Final Environmental Impact Statement, volume 1 PDF ...

  17. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  18. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  19. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  20. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  1. EIS-0333: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact ...

  2. Boise geothermal injection well: Final environmental assessment

    SciTech Connect (OSTI)

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  3. EA-1880: Notice of Availability of a Draft Environmental Assessment |

    Energy Savers [EERE]

    Department of Energy Availability of a Draft Environmental Assessment EA-1880: Notice of Availability of a Draft Environmental Assessment Big Bend to Witten Transmission Line Project, South Dakota The USDA Rural Utilities Service, initially the lead agency, issued a draft EA that assesses the potential environmental impacts of a proposal by Basic Electric Power Cooperative to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line in South Dakota.

  4. EA-1946: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Assessment EA-1946: Draft Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. PDF icon EA-1946-DEA-2014.pdf More Documents & Publications EA-1946: Final

  5. EA-1946: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Final Environmental Assessment EA-1946: Final Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration (BPA) issued a Final EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. The Final EA consists of comments received on the draft EA and responses to the

  6. EA-1959: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Assessment EA-1959: Draft Environmental Assessment Eightmile Ranch Coho Acclimation Site; Okanogan County, Washington Bonneville Power Administration and USDA Forest Service, Okanogan-Wenatchee National Forest, jointly issued a draft EA that assesses the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation to construct and operate a coho salmon acclimation pond at Eightmile Ranch, which is owned and operated by the Forest

  7. EA-2000: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    0: Draft Environmental Assessment EA-2000: Draft Environmental Assessment Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee The draft EA assesses the potential environmental impacts of a proposed title transfer of property located at the East Tennessee Technology Park (ETTP) Heritage Center to the Metropolitan Knoxville Airport Authority for the purpose of constructing and operating a general aviation airport.

  8. EA-2003: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    31: Draft Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. PDF icon EA-1931-DEA-2013.pdf

  9. EA-2011: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Release of Three Parasitoids for the Biological Control of the Emerald Ash Borer (Agrilus Planipennis) in the Continental United States The DOE Oak Ridge Office reviewed and adopted a July 2007 EA prepared by the USDA Animal and Plant Health Inspection Service that analyzed the potential environmental impacts of the release of three parasitoids into the continental U.S. for the biological control of the emerald ash borer, a nonnative invasive beetle.

  10. DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a...

  11. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex ... This Complex Transformation Supplemental Programmatic Environmental Impact Statement ...

  12. EIS-0491: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  13. EIS-0451: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Environmental Impact Statement EIS-0451: Final Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Area Power...

  14. EIS-0097: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The ...

  15. Environmental impact of APC residues from municipal solid waste incineration: Reuse assessment based on soil and surface water protection criteria

    SciTech Connect (OSTI)

    Quina, Margarida J.; Bordado, Joao C.M.; Quinta-Ferreira, Rosa M.

    2011-09-15

    Highlights: > The Dutch Building Material Decree (BMD) was used to APC residues from MSWI. > BMD is a straightforward tool to calculate expectable loads to the environment of common pollutants. > Chloride load to the environment lead to classification of building material not allowed. > At least a pre-treatment (e.g. washing) is required in order to remove soluble salts. > The stabilization with phosphates or silicates eliminate the problem of heavy metals. - Abstract: Waste management and environmental protection are mandatory requirements of modern society. In our study, air pollution control (APC) residues from municipal solid waste incinerators (MSWI) were considered as a mixture of fly ash and fine particulate solids collected in scrubbers and fabric filters. These are hazardous wastes and require treatment before landfill. Although there are a number of treatment options, it is highly recommended to find practical applications rather than just dump them in landfill sites. In general, for using a construction material, beyond technical specifications also soil and surface water criteria may be used to ensure environmental protection. The Dutch Building Materials Decree (BMD) is a valuable tool in this respect and it was used to investigate which properties do not meet the threshold criteria so that APC residues can be further used as secondary building material. To this end, some scenarios were evaluated by considering release of inorganic species from unmoulded and moulded applications. The main conclusion is that the high amount of soluble salts makes the APC residues a building material prohibited in any of the conditions tested. In case of moulding materials, the limits of heavy metals are complied, and their use in Category 1 would be allowed. However, also in this case, the soluble salts lead to the classification of 'building material not allowed'. The treatments with phosphates or silicates are able to solve the problem of heavy metals, but difficulties with the soluble salts are still observed. This analysis suggests that for APC residues to comply with soil and surface water protection criteria to be further used as building material at least a pre-treating for removing soluble salts is absolutely required.

  16. Finding of No Significant Impact and Final Environmental Assessment for the Future Location of Heat Source/Radioisotope Power System Assembly and Testing and Operations Currently Located at the Mound Site

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    The U.S. Department of Energy (the Department) has completed an Environmental Assessment for the Future Location of the Heat Source/Radioisotope Power System Assembly and Test. Operations Currently Located at the Mound Site. Based on the analysis in the environmental assessment, the Department has determined that the proposed action, the relocation of the Department's heat source and radioisotope power system operations, does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the ''National Environmental Policy Act'' of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required, and the Department is issuing this Finding of No Significant Impact (FONSI).

  17. Environmental Protection Agency, Environmental Impact Statements...

    Office of Environmental Management (EM)

    ... change; discussion of a proposal to hold a risk assessment workshop in 2005, ORD's Biotechnology Research Strategy and Coastal Health report, and interagency relationships; update ...

  18. Role of basic ecological knowledge in environmental assessment

    SciTech Connect (OSTI)

    Hildebrand, S.G.; Barnthouse, L.W.; Suter, G.W.

    1984-01-01

    The role of basic ecological knowledge in environmental impact assessment was examined. The focus was primarily on the NEPA process. Experience in population biology and ecosystem studies is discussed, the successes and limits of applicability are highlighted, and implications for long-term research needs are identified. Current attempts to develop a national assessment of acid deposition impacts are reviewed. 48 refs. (ACR)

  19. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31,...

  20. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0218: Final Environmental Impact Statement Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel January 1, 1996 EIS-0214:...

  1. EIS-0146: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0146: Final Programmatic Environmental Impact Statement Clean Coal Technology Demonstration Program The proposed action evaluated in this PEIS is to continue the Clean Coal ...

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 15, 2015 EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska January 8, 2015 EIS-0481: Draft Programmatic...

  3. Articles about Environmental Impacts and Siting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    about Environmental Impacts and Siting en Wind Measurement Buoy Advances Offshore Wind Energy http:energy.goveerearticleswind-measurement-buoy-advances-offshore-wind-ene...

  4. EIS-0251: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996)

  5. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Project March 1, 2001 EIS-0281: Draft Environmental Impact Statement Summary (Spanish) Laboratorios Nacionales de SandiaNuevo Mexico Declaracion de Impacto Ambiental de...

  6. Environmental Impact Statement Summary (DOE, 1998) | Department...

    Office of Environmental Management (EM)

    More Documents & Publications "Frequently Asked Questions" on the Department of Energy's NEPA Regulations (DOE, 1998) EIS-0456: Final Environmental Impact Statement EIS-0245-SA-01: ...

  7. EIS-0158: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California

  8. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  9. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  10. Articles about Environmental Impacts and Siting | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Articles about Environmental Impacts and Siting Wind Measurement Buoy Advances Offshore Wind Energy A next-generation buoy will provide unprecedented information on offshore wind...

  11. EIS-0408: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts ...

  12. EIS-0459: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0459: Final Programmatic Environmental Impact Statement Hawai'i's Evolution: Hawai'i Powered. Technology Driven. EIS-0459: Amended Notice of ...

  13. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  14. West Wide Programmatic Environmental Impact Statement Record...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: West Wide Programmatic Environmental Impact Statement Record of Decision (BLM)Legal...

  15. EIS-0083: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  16. Schedules of Key Environmental Impact Statements

    Broader source: Energy.gov [DOE]

    This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly). This chart represents anticipated activity and is not a...

  17. Final Supplemental Environmental Assessment (EA-1792)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish ...

  18. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  19. EA-1931: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    PDF icon EA-1931-FEA-2014.pdf More Documents & Publications EA-1931: Draft Environmental Assessment EA-1931: Finding of No Significant Impact and Mitigation Action Plan EIS-0285-SA...

  20. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  1. EIS-0370: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Final Environmental ...

  2. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  3. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  4. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  5. Electronic Submittal of Environmental Impact Statements to EPA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electronic Submittal of Environmental Impact Statements to EPA (EPA, 2012) Electronic Submittal of Environmental Impact Statements to EPA (EPA, 2012) e-NEPA is the Environmental ...

  6. DOE Plans Supplemental Environmental Impact Statement for New Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reserve Site in Mississippi | Department of Energy Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi March 5, 2008 - 10:52am Addthis Three Public Meetings Planned Next Month; Supplemental Study to Include Floodplain and Wetlands Assessments WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced plans to prepare a Supplemental

  7. ARM - The Environmental Impacts of Agents for Change

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Impacts of Agents for Change Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans The Environmental Impacts of Agents for Change What Has Been Happening Over the Past Century? Here we can refer to the Second Assessment Report of the Intergovernmental Panel on Climate Change approved

  8. Environmental Impacts from the Operation of Cooling Towers at SRP

    SciTech Connect (OSTI)

    Smith, F.G. III

    2001-06-26

    An assessment has been made of the environmental effects that would occur from the operation of cooling towers at the SRP reactors. A more realistic numerical model of the cooling tower plume has been used to reassess the environmental impacts. The following effects were considered: (1) the occurrence of fog and ice and their impact on nearby structures, (2) drift and salt deposition from the plume, (3) the length and height of the visible plume, and (4) the possible dose from tritium.

  9. Environmental Assessment Q&A Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE has prepared a Draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. This document examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assess- ment also looks at the potential cumulative impacts of conducting experiments and operat- ing WIPP as a transuranic waste repository. This fact sheet

  10. EA-1903: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    03: Final Environmental Assessment EA-1903: Final Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas This EA evaluates the potential environmental impacts of a proposal to use Congressional Directed funds to develop the Great Plains Wind Energy Consortium aimed at increasing the penetration of wind energy via distributed wind power generation throughout the region. PDF icon EA-1903-FEA-2014.pdf More Documents & Publications EA-1903: Draft

  11. EA-2020: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-2020: Draft Environmental Assessment Energy Efficiency Standards for New Federal Low-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD56) Section 305(a) of the Energy Conservation and Production Act (ECPA) requires that DOE establish by rule Federal building and energy efficiency standards for all Federal commercial and multi-family high-rise residential buildings. This draft EA evaluates the potential environmental impacts of updating the

  12. EA-0942: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    42: Final Environmental Assessment EA-0942: Final Environmental Assessment Return of Isotope Capsules to the Waste Encapsulation and Storage Facility, Hanford Site, Richland, Washington This EA evaluates the environmental impacts of the proposal for the return of all leased cesium-137 and strontium-90 leased capsules to the U.S. Department of Energy's Waste Encapsulation and Storage Facility on the Hanford Site, to ensure safe management and storage, pending final disposition. PDF icon

  13. EA-1406: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    6: Final Environmental Assessment EA-1406: Final Environmental Assessment Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site This EA evaluates the environmental impacts for the proposed compliance strategy of natural flushing combined with institutional controls and continued monitoring for the New Rifle uranium mill tailings site. PDF icon EA-1406-FEA-2003.pdf More Documents & Publications Analysis and Geochemical Modeling of Vanadium Contamination in Groundwater New

  14. EA-1943: Draft Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Assessment EA-1943: Draft Environmental Assessment Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) at Fermilab, Batavia, Illinois and the Sanford Underground Research Facility, Lead, South Dakota This Draft EA evaluates the environmental impacts of using the existing Main Injector Accelerator at Fermilab to produce a pure beam of muon neutrinos. The neutrinos would be examined at a "near detector" proposed to be constructed at

  15. EA-0978: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Assessment EA-0843: Final Environmental Assessment Idaho National Engineering Laboratory Low-Level and Mixed Waste Processing This EA evaluates the environmental impacts of a proposal to (1) reduce the volume of the U.S. Department of Energy's Idaho National Engineering Laboratory's (INEL) generated low-level waste (LLW) through sizing, compaction, and stabilization at Waste Experimental Reduction Facility (WERF); and (2) use commercial offsite facilities for supplemental

  16. EA-1061: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    02: Final Environmental Assessment EA-1002: Final Environmental Assessment Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. PDF icon EA-1002-FEA-1994.pdf More Documents & Publications EA-1241: Finding of

  17. EA-1339: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    89: Final Environmental Assessment EA-1189: Final Environmental Assessment Non-thermal Treatment of Hanford Site Low-level Mixed Waste This EA evaluates the environmental impacts for the proposal to demonstrate the feasibility of commercial treatment of contact-handled low-level mixed waste to meet existing Federal and State regulatory standards for eventual land disposal at the U.S. Department of Energy Richland Operations Office. PDF icon EA-1189-FEA-1998.pdf More Documents & Publications

  18. EIS-0469: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0469: Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS evaluates the environmental impacts of...

  19. Draft Environmental Assessment Sleeping Giant Hydropower Project

    Energy Savers [EERE]

    Draft Environmental Assessment Sleeping Giant Hydropower Project Montana Area Office Great Plains Region October 2015 Draft Environmental Assessment Sleeping Giant Hydropower Project Table of Contents (Page 1 of 3) CHAPTER 1 - INTRODUCTION .................................................................................................................... 1 PROPOSED ACTION

  20. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Campbell County Wind Farm, Campbell County, South Dakota July 9, 2014 EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho...

  1. Idaho DEQ Environmental Assessment Information | Open Energy...

    Open Energy Info (EERE)

    Assessment Information Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho DEQ Environmental Assessment Information Abstract This website provides an...

  2. ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS

    SciTech Connect (OSTI)

    Wilde, P.

    1980-06-01

    Logical and orderly progression of the OTEC program from conceptual designs through component testing to the goal of commercially viable OTEC plants require that the socio-legal requirements be met and the proper operating permits be obtained and maintained. This function is accomplished in a series of activities including: (1) Development and annual revision of a published OTEC Environmental Development Plan (EDP); (2) Compliance with NEPA/EPA and other regulatory requirements; and (3) Studies and research in support of the above. The Environmental Development Plan (EDP) lists the concerns, outlines the program to consider the effects and validity of such concerns on the OTEC program, and gives the time-table to meet the schedule, integrated with that of the engineering and design programs. The schedules of compliance activities and, to a lesser degree, research also are governed by the development progress of the technology. However, because of the lead time necessary to insure proper review the appropriate regulatory agencies, the environmental assessment program for the OTEC pilot plants (initially starting with the 10/40 MWe unit) is founded on the strategy of progressive improvement of previously accepted documentation. Based on experience with OTEC-1, the procedure for pilot plants will be: (1) Produce generic Environmental Assessment (EA) at the appropriate level of technology in advance of hardware contract; (2) Produce generic Environmental Impact Statement (EIS) at approximately the same time as the hardware procurement; (3) Monitor production of site specific supplement to the generic EIS prepared by the hardware contractor; (4) Assist pilot plant operator in applying and obtaining permits by providing current research and modeling data; (5) Monitor environmental program as required by regulatory agency; and (6) Use new site data for refining models for future pilot plant. assessments.

  3. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  4. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630)...

  5. Environmental Assessments (EA) / Environmental Impact Statements...

    Office of Science (SC) Website

    Site Office (TJSO) Integrated Support Center Chicago Office (CH) Oak Ridge Office (OR) New Brunswick Laboratory New Brunswick Laboratory (NBL) Last modified: 682015 3:07:39

  6. Impact Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Assessments Impact Assessments american-flag-802087_960_720.jpg DOE F 206.1 PIA Template (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf) DOE Jobs Online (Hiring Management)

  7. DOE - NNSA/NFO -- Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Site-Wide Environmental Impact Statement (EIS) NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Final Site-Wide Environmental Impact Statement (SWEIS) On February 14, 2013, the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. Available electronically and in hard copy, the document can be obtained by clicking on the links below or calling 702-295-3521.

  8. DOE - NNSA/NFO -- Environmental Impact Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site-Wide Environmental Impact Statement (EIS) NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Site-Wide Environmental Impact Statement (SWEIS) SWEIS Cover Art On February 14, 2013, the Final Site-Wide Environmental Impact Statement for the Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada was published. Available electronically and in hard copy, the document can be obtained by clicking here or calling 702-295-3521. Stakeholder

  9. Resource Contingency Program : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  10. OCEAN THERMAL ENERGY CONVERSION PROGRAMMATIC ENVIRONMENTAL ASSESSMENT

    SciTech Connect (OSTI)

    Sands, M.Dale

    1980-08-01

    Significant achievements in Ocean Thermal Energy Conversion (OTEC) technology have increased the probability of producing OTEC-derived power in this decade with subsequent large-scale commercialization to follow by the turn of the century. Under U.S. Department of Energy funding, Interstate Electronics has prepared an OTEC Programmatic Environmental Assessment (EA) that considers tne development, demonstration, and commercialization of OTEC power systems. The EA considers several tecnnological designs (open cycle and closed cycle), plant configurations (land-based, moored, and plantship), and power usages (baseload electricity and production of ammonia and aluminum). Potencial environmental impacts, health and safety issues, and a status update of international, federal, and state plans and policies, as they may influence OTEC deployments, are included.

  11. Environmental Impact of Smart Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    pollutants * Evaluate impact from Smart Grid on reducing pollutants through: - Demand Response - Electric Vehicles - Demand Side Management - Renewables and Distributed Energy ...

  12. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    SciTech Connect (OSTI)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  13. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  14. EA-1606: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1606: Final Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training, SC DOE prepared an environmental assessment ...

  15. EA-1558: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    58: Final Environmental Assessment EA-1558: Final Environmental Assessment National Synchrotron Light Source II at Brookhaven National Laboratory This environmental assessment ...

  16. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  17. Office of Nuclear Safety and Environmental Assessments | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Safety and Environmental Assessments Office of Nuclear Safety and Environmental Assessments MISSION The Office of Nuclear Safety and Environmental Assessments conducts ...

  18. DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID – After completing a careful assessment, the U.S. Department of Energy has determined that building a new facility at its Idaho National Laboratory site for continued disposal of remote-handled low level radioactive waste generated by operations at the site will not have a significant impact on the environment.

  19. Analysis of methods and models for assessing the direct and indirect economic impacts of CO/sub 2/-induced environmental changes in the agricultural sector of the US economy

    SciTech Connect (OSTI)

    Callaway, J.M.

    1982-08-01

    Alternative methods for quantifying the economic impacts associated with future increases in the ambient concentration of CO/sub 2/ were examined. A literature search was undertaken, both to gain a better understanding of the ways in which CO/sub 2/ buildup could affect crop growth and to identify the different methods available for assessing the impacts of CO/sub 2/-induced environmental changes on crop yields. The second task involved identifying the scope of both the direct and indirect economic impacts that could occur as a result of CO/sub 2/-induced changes in crop yields. The third task then consisted of a comprehensive literature search to identify what types of economic models could be used effectively to assess the kinds of direct and indirect economic impacts that could conceivably occur as a result of CO/sub 2/ buildup. Specific attention was focused upon national and multi-regional agricultural sector models, multi-country agricultural trade models, and macroeconomic models of the US economy. The fourth and final task of this research involved synthesizing the information gathered in the previous tasks into a systematic framework for assessing the direct and indirect economic impacts of CO/sub 2/-induced environmental changes related to agricultural production.

  20. Environmental impacts of proposed Monitored Retrievable Storage

    SciTech Connect (OSTI)

    Scharber, Wayne K.; Macintire, H. A.; Davis, Paul E.; Cothron, Terry K.; Stephens, Barry K.; Travis, Norman; Walter, George; Mobley, Mike

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  1. Transmission line environmental assessment guidance document

    SciTech Connect (OSTI)

    Jackson, J.; Pentecost, E.; Muzzarelli, J.

    1994-01-01

    Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

  2. Surplus Plutonium Disposition Supplemental Environmental Impact Statement |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Surplus Plutonium Disposition Supplemental Environmental Impact Statement ANNOUNCEMENT - March 30, 2016 Today I signed the Record of Decision (ROD) for Disposition of Surplus Non-Pit Plutonium for the Final Surplus Plutonium Disposition (SPD) Supplemental Environmental Impact Statement (Supplemental EIS). The ROD outlines the Department of Energy's National Nuclear Security Administration (DOE/NNSA) path forward to prepare and process six metric tons

  3. Assessing the impacts of climate change on natural resource systems

    SciTech Connect (OSTI)

    Frederick, K.D.; Rosenberg, N.J. [eds.

    1994-11-30

    This volume is a collection of papers addressing the theme of potential impacts of climatic change. Papers are entitled Integrated Assessments of the Impacts of Climatic Change on Natural Resources: An Introductory Editorial; Framework for Integrated Assessments of Global Warming Impacts; Modeling Land Use and Cover as Part of Global Environmental Change; Assessing Impacts of Climatic Change on Forests: The State of Biological Modeling; Integrating Climatic Change and Forests: Economic and Ecological Assessments; Environmental Change in Grasslands: Assessment using Models; Assessing the Socio-economic Impacts of Climatic Change on Grazinglands; Modeling the Effects of Climatic Change on Water Resources- A Review; Assessing the Socioeconomic Consequences of Climate Change on Water Resources; and Conclusions, Remaining Issues, and Next Steps.

  4. Supplemental information related to risk assessment for the off-site transportation of low-level waste for the U.S. Department of Energy waste management programmatic environmental impact statement

    SciTech Connect (OSTI)

    Monette, F.A.; Biwer, B.M.; LePoire, D.J.; Chen, S.Y. [Argonne National Lab., IL (United States). Environmental Assessment Div.

    1996-12-01

    This report presents supplemental information to support the human health risk assessment conducted for the transportation of low-level waste (LLW) in support of the US Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS). Detailed descriptions of the transportation health risk assessment method and results of the assessment are presented in Appendix E of the WM PEIS and are not repeated in this report. This report presents additional information that is not presented in Appendix E but that was needed to conduct the transportation risk assessment for Waste Management (WM) LLW. Included are definition of the LLW alternatives considered in the WM PEIS, data related to the inventory and to the physical and radiological characteristics of WM LLW, an overview of the risk assessment method, and detailed results of the assessment for each WM LLW alternative considered.

  5. PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM ROCKY FLATS ENVIRONMENTAL RECORDS DATABASE PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete

  6. Environmental assessment: South microwave communication facilities

    SciTech Connect (OSTI)

    Not Available

    1989-06-01

    Western Area Power Administration (Western) is proposing to construct, operate, and maintain eight microwave repeater stations in southwestern Colorado, southeastern Utah, and northern Arizona, in order to meet the minimum fade criteria established by the Western Systems Coordinating Council (WSCC) for the operation and protection of electric power systems. The proposed microwave facilities would increase the reliability of communication. This environmental assessment (EA) describes the existing environmental conditions and the impacts from construction of the eight microwave communication facilities. The EA was prepared in compliance with the National Environmental Policy Act of 1969, the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Department of Energy Guidelines (52 FR 47662, December 15, 1987). The proposed project would consist of constructing eight microwave facilities, each of which would include a self-supported lattice tower, an equipment building, a propane tank, distribution lines to provide electric power to the sites, and access roads to the sites. The facilities would be constructed in San Miguel and Montezuma Counties in Colorado, San Juan County, Utah, and Navajo, Apache, Coconino, and Yavapai Counties in Arizona. 20 refs., 2 figs., 2 tabs.

  7. Environmental Assessment and Finding of No Significant Impact: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership

    SciTech Connect (OSTI)

    N /A

    2000-04-25

    The scope of this environmental assessment (EA) is to analyze the potential consequences of the Proposed Action on human health and the environment. Accordingly, this EA contains an introduction to the site and the history of the Grand Junction Office (Chapter One), a description of the Purpose and Need for Agency Action (Chapter Two), a description of the Proposed Action and Alternatives (Chapter Three), and the description of the Affected Environment and the Environmental Consequences (Chapter Four). Resource categories addressed in this EA include geology, soils and topography, groundwater and surface water, floodplains and wetlands, land use and infrastructure, human health, ecological resources, cultural resources, air quality, noise, visual resources, solid and hazardous waste management, transportation, and socioeconomic and environmental justice.

  8. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125 Energy

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits

  9. EA-1083: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    New Silt/Clay Source Development and Use at the Idaho National Engineering and Environmental Laboratory

  10. EA-0995: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations

  11. EA-1143: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Evaluation Notification Form for University of Nebraska Medical Center: Lied Transplant Center

  12. EA-0970: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Safety and Health Analytical Laboratory Project No. 94-AA-01 Pantex Plant Amarillo, TX

  13. EA-1364: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    64: Final Environmental Assessment EA-1364: Final Environmental Assessment Proposed Construction and Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM This EA evaluates the potential environmetnal impacts of a proposal to construct an approximately 3,000 square foot, one-storypermanent facility which includes two BSL-3 laboratories with adjoining individual mechanical rooms separated by a central support BSL-2 laboratory; clothes-change andshower rooms;

  14. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  15. EIS-0399: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0399: Notice of Intent to Prepare an Environmental Impact Statement Presidential Permit Application for Montana ...

  16. EIS-0450: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EIS-0450: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  17. EIS-0317-S1: Environmental Impact Statement, Appendices | Department...

    Office of Environmental Management (EM)

    17-S1: Environmental Impact Statement, Appendices EIS-0317-S1: Environmental Impact Statement, Appendices Kangley-Echo Lake Transmission Line Project Appendices BPA is proposing to...

  18. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  19. EIS-0481: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Final Environmental Impact Statement More Documents & Publications EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement...

  20. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  1. EIS-0388: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final...

  2. EIS-0072: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF ...

  3. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  4. EIS-0414: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC ...

  5. DOE Issues Final Site-Wide Environmental Impact Statement for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement for the Nevada National Security Site DOE Issues Final Site-Wide Environmental Impact Statement for the Nevada National Security Site...

  6. EIS-0427: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of...

  7. EIS-0060: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & ...

  8. EIS-0306: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that...

  9. EIS-0171: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville ...

  10. EIS-0125: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement Bonneville Power Administration Intertie Development and Use The Bonneville Power ...

  11. EIS-0116: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon ...

  12. EIS-0123: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0123: Final Environmental Impact Statement Direct Service Industry Options BPA proposes to implement one or more options to reduce load ...

  13. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  14. EIS-0162: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Impact Statement EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs PDF icon EIS-0162-FEIS-Summary.pdf ...

  15. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  16. EIS-0073: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon ...

  17. EIS-0145: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOEEIS-0145, Bonneville ...

  18. EIS-0337: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley ...

  19. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  20. EIS-0421: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  1. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  2. EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Hawaii Clean Energy Programmatic Environmental Impact Statement EIS-0459: Hawaii Clean Energy Programmatic Environmental Impact Statement Summary DOE prepared a programmatic EIS...

  3. EIS-0332: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and...

  4. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  5. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  6. EIS-0401: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0401: Notice of Intent to Prepare an Environmental Impact Statement Construction and Operation of the Proposed NextGen Energy Facility The...

  7. EIS-0411: Notice of Cancellation of the Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE), is canceling preparation of the Environmental Impact StatementEnvironmental Impact Report (EISEIR) for construction, operation, and maintenance of the proposed...

  8. EIS-0439: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0439: Notice of Intent to Prepare an Environmental Impact Statement Proposed Construction and Operation of the Rice Solar Energy Project,...

  9. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0511: Final Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating...

  10. EIS-0430: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement EIS-0430: Notice of Intent to Prepare an Environmental Impact Statement Federal Loan Guarantee to Support Construction and Start-up of the...

  11. Title 40 CFR 1502 - Environmental Impact Statement | Open Energy...

    Open Energy Info (EERE)

    Regulation: Title 40 CFR 1502 - Environmental Impact StatementLegal Abstract Subpart 1502 Environmental Impact Statement under Title 40: Protection of Environment of the U.S. Code...

  12. EIS-0492: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0492: EPA Notice of Availability of Draft Environmental Impact Statement Oregon LNG Export Project ...

  13. EIS-0449: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible...

  14. EIS-0378: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has...

  15. FAO-Environmental Impact Statement Guidelines | Open Energy Informatio...

    Open Energy Info (EERE)

    so as to avoid significant negative impacts of environmental or associated social nature." References "FAO-Environmental Impact Statement Guidelines" Retrieved from...

  16. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  17. EIS-0447: EPA Notice of Availability Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability Final Environmental Impact Statement EIS-0447: EPA Notice of Availability Final Environmental Impact Statement Champlain Hudson Power Express ...

  18. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, ...

  19. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line ...

  20. EIS-0431: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's ...

  1. EIS-0463: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line ...

  2. EIS-0503: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0503: EPA Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link ...

  3. EIS-0340: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0340-NOI-2001.pdf More Documents & Publications EIS-0340: Draft Environmental Impact Statement EIS-0340: Record of Decision EIS-0340: Final Environmental Impact Statement...

  4. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  5. EIS-0372: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) ... EIS-0372: Final Environmental Impact Statement PP-89-1 Bangor Hydro-Electric Company

  6. EIS-0503: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link ...

  7. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  8. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  9. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  10. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  11. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  12. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  13. EIS-0485: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  14. EIS-0438: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY This EIS ...

  15. EIS-0485: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0485: Notice of Intent to Prepare an Environmental Impact Statement Interconnection of the Grande Prairie Wind ...

  16. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  17. Guidance for Site-wide Environmental Impact Statements | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    guidance for Site-wide Environmental Impact Statements PDF icon Guidance for Site-wide Environmental Impact Statements More Documents & Publications Recommendations on...

  18. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0450: Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada Download Document ...

  19. EIS-0512: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent to Prepare an Environmental Impact Statement EIS-0512: Notice of Intent to Prepare an Environmental Impact Statement Alaska LNG Project, Alaska The Federal Energy Regulatory ...

  20. EIS-0499: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    499: Notice of Intent to Prepare Environmental Impact Statement EIS-0499: Notice of Intent to Prepare Environmental Impact Statement Great Northern Transmission Line Project The ...

  1. Agencies Publish Final Environmental Impact Statement on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West ...

  2. EIS-0064: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Final Environmental Impact Statement EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) PDF icon ...

  3. EIS-0486: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0486: Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Final EIS to evaluate the ...

  4. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  5. EIS-0499: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the ...

  6. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  7. EIS-0503: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, ...

  8. EIS-0496: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Impact Statement EIS-0496: Notice of Intent to Prepare an Environmental Impact Statement DOE's Western Area Power Administration ...

  9. DOE Environmental Impact Statement Public Scoping Meeting on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project DOE Environmental Impact Statement Public Scoping Meeting on ...

  10. EIS-0463: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0463: Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire DOE issued a Draft EIS that evaluates the ...

  11. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  12. EIS-0463: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0463: Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings ...

  13. EIS-0375: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C ...

  14. EIS-0501: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; ...

  15. EIS-0222: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared ...

  16. EIS-0498: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0498: Draft Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy ...

  17. EIS-0493: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a ...

  18. EIS-0503: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare Environmental Impact Statement EIS-0503: Notice of Intent to Prepare Environmental Impact Statement New England Clean Power Link, Vermont DOE announces ...

  19. EIS-0501: Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of Draft Environmental Impact Statement EIS-0501: Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and ...

  20. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California ...

  1. EIS-0270: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  2. EIS-0376: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  3. EIS-0228: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  4. EIS-0496: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0496: Final Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California ...

  5. EIS-0503: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential ...

  6. Draft Environmental Impact Statement Available for Public Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, ...

  7. EIS-0279: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  8. EIS-0488: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the ...

  9. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Notice of Adoption of an Environmental Impact Statement EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, ...

  10. EIS-0501: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0501: Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission ...

  11. Supplemental Analysis for the Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final ...

  12. EIS-0375: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C ...

  13. EIS-0498: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0498: Final Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy ...

  14. EIS-0376: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  15. EIS-0496: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0496: EPA Notice of Availability of Final Environmental Impact Statement San Luis Transmission Project; ...

  16. EIS-0500: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Notice of Intent to Prepare Environmental Impact Statement EIS-0500: Notice of Intent to Prepare Environmental Impact Statement Crystal Springs Hatchery Program; Bingham, ...

  17. EIS-0306: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0493: Notice of Availability of the Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of the Draft Environmental Impact Statement EIS-0493: Notice of Availability of the Draft Environmental Impact Statement The Federal Energy Regulatory Commission ...

  19. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Draft Environmental Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits ...

  20. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    82-S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  1. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project ...

  2. EIS-0499: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Final EIS to evaluate the ...

  3. EIS-0217: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  4. EIS-0491: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  5. EIS-0499: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line ...

  6. EIS-0480: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0480: Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam The Bureau of ...

  7. EIS-0271: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  8. EIS-0503: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the ...

  9. DOE to Prepare a Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Prepare a Supplemental Environmental Impact Statement for Proposed Surplus Plutonium Disposition at the Savannah River Site DOE to Prepare a Supplemental Environmental Impact ...

  10. EIS-0108: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  11. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  12. EIS-0226: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0226: Final Environmental Impact Statement Decommissioning andor Long-Term Stewardship at the West Valley Demonstration Project and ...

  13. EIS-0504: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent to Prepare Environmental Impact Statement EIS-0504: Notice of Intent to Prepare Environmental Impact Statement Gulf LNG Liquefaction Project, Jackson County, Mississippi The ...

  14. EIS-0113: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13: Final Environmental Impact Statement EIS-0113: Final Environmental Impact Statement Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, ...

  15. EIS-0407: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, ...

  16. EIS-0508: FERC Notice of Intent to Prepare Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0508: FERC Notice of Intent to Prepare Environmental Impact Statement The Federal Energy Regulatory ...

  17. EIS-0447: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Impact Statement and Conduct Public Scoping Meetings EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and ...

  18. EIS-0488: Notice of Adoption of FERC Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Adoption of FERC Final Environmental Impact Statement EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement Cameron Liquefaction Project, Cameron ...

  19. EIS-0486: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of Final Environmental Impact Statement EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project ...

  20. EIS-0068: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: ...

  1. EIS-0510: FERC Notice of Intent to Prepare Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement Calcasieu Pass Project, Cameron ...

  2. EIS-0513: FERC Notice of Intent to Prepare Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare Environmental Impact Statement EIS-0513: FERC Notice of Intent to Prepare Environmental Impact Statement Jacksonville Project, Jacksonville, Florida The ...

  3. EIS-0436: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0436: Final Environmental Impact Statement I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, ...

  4. EIS-0243: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  5. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to ...

  6. EIS-0489: Notice of Availability for Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Notice of Availability for Final Environmental Impact Statement EIS-0489: Notice of Availability for Final Environmental Impact Statement Jordan Cove Liquefaction Project (Coos ...

  7. EIS-0502: Notice of Intent to Prepare Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Notice of Intent to Prepare Environmental Impact Statement EIS-0502: Notice of Intent to Prepare Environmental Impact Statement Hot Springs to Anaconda Transmission Line Rebuild ...

  8. EIS-0497: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Notice of Intent to Prepare an Environmental Impact Statement EIS-0497: Notice of Intent to Prepare an Environmental Impact Statement CE FLNG Project, Plaquemines Parish, ...

  9. EIS-0249: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  10. EIS-0297: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  11. EIS-0390: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intent to Prepare an Environmental Impact Statement; Floodplain and Wetlands Involvement; and Public Scoping Meetings EIS-0390: Notice of Intent to Prepare an Environmental Impact...

  12. EIS-0409: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Prepare an Environmental Impact Statement and Notice of Proposed Floodplain and Wetlands Involvement EIS-0409: Notice of Intent to Prepare an Environmental Impact Statement...

  13. EIS-0389: Notice of Intent To Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement and Conduct Scoping Meetings; Notice of Floodplain and Wetlands Involvement EIS-0389: Notice of Intent To Prepare an Environmental Impact Statement...

  14. EIS-0156: Cowlitz Falls Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to assess the environmental impacts of constructing and operating a proposed 70-megawatt hydroelectric dam and electrical infrastructure on the Cowlitz River near Morton and Randle, Washington. The U.S. Department of Energy's Bonneville Power Administration adopted this statement on 12/6/1990 to fulfil its National Environmental Policy Act requirement for its proposed action to acquire the power output from the Cowlitz Falls Hydroelectric Project.

  15. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  16. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  17. EA-1974: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1974: Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Bonneville Power Administration ...

  18. Environmental Assessments (EA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Buildings August 3, 2015 EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas July 31, 2015 EA-2000: Draft...

  19. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 1, 2010 EA-1684: Final Environmental Assessment Construction And Operation Of The Facility For Rare Isotope Beams, Michigan State University, East Lansing, Michigan...

  20. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Point of contact for more information: Robert Smith, Department of Energy-Paducah PDF icon Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and ...

  1. Public Involvement in the Environmental Assessment Process

    Broader source: Energy.gov [DOE]

    A DOE policy regarding the online publication and electronic notification of the availability of draft environmental assessments (EAs) for public comment.

  2. Independent Oversight Assessment, DOE Office of Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the evaluation was to provide information regarding the status of the safety culture within the Office of Environmental Management. The data collection phase of the assessment ...

  3. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the Sanford Underground Research Facility, Lead, South Dakota May 4, 2015 EA-1989: Draft Environmental Assessment Cliffrose Solar Energy Interconnection Project, Mohave...

  4. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  5. Health impact assessment in Korea

    SciTech Connect (OSTI)

    Kang, Eunjeong; Lee, Youngsoo; Harris, Patrick; Koh, Kwangwook; Kim, Keonyeop

    2011-07-15

    Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

  6. Usefulness of programmatic environmental impact statements

    SciTech Connect (OSTI)

    Pinkney, F.C.; Downey, K.M. )

    1993-01-01

    Programmatic environmental impact statements (EISs) are comprehensive documents that integrate environmental considerations into planning and operational decisions at the concept level, avoiding the need for repetitive environmental documentation of specific actions. Procedures developed in the programmatic EIS provide a process for incorporating environmental considerations into the planning phase of future actions and assist in determining the type of environmental considerations into the planning phase of future actions and assist in determining the type of environmental documentation necessary. The programmatic EIS project area is divided into recognizable geographic zones. These zones are mapped and an evaluation zone summary sheet is developed for each area that contains an inventory of pertinent information for analysis of environmental issues. On each map and summary sheet, sensitive zones that are adversely affected and/or require mitigation for implementation of proposed actions are easily recognizable. Accompanying narrative provides both insight for mitigating potential impacts within the sensitive areas and how such impacts should be addressed. Additional assistance in evaluating the effects of planned actions is provided by identifying thresholds of significance at which the effect of a proposed action may prompt the need for environmental documentation.

  7. Explanation of Significant Differences Between Models used to Assess Groundwater Impacts for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and Greater-Than-Class C-Like Waste Environmental Impact Statement (DOE/EIS-0375-D) and the

    SciTech Connect (OSTI)

    Annette Schafer; Arthur S. Rood; A. Jeffrey Sondrup

    2011-08-01

    Models have been used to assess the groundwater impacts to support the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE-EIS 2011) for a facility sited at the Idaho National Laboratory and the Environmental Assessment for the INL Remote-Handled Low-Level Waste Disposal Project (INL 2011). Groundwater impacts are primarily a function of (1) location determining the geologic and hydrologic setting, (2) disposal facility configuration, and (3) radionuclide source, including waste form and release from the waste form. In reviewing the assumptions made between the model parameters for the two different groundwater impacts assessments, significant differences were identified. This report presents the two sets of model assumptions and discusses their origins and implications for resulting dose predictions. Given more similar model parameters, predicted doses would be commensurate.

  8. JC3 High Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Assessment Bulletins JC3 High

  9. JC3 Low Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Impact Assessment Bulletins JC3 Low

  10. JC3 Medium Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medium Impact Assessment Bulletins JC3 Medium

  11. Environmental Impacts of Wind Power Development on the Population Biology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Greater Prairie-Chickens | Department of Energy Impacts of Wind Power Development on the Population Biology of Greater Prairie-Chickens Environmental Impacts of Wind Power Development on the Population Biology of Greater Prairie-Chickens This report summarizes the results of a seven-year, DOE-funded research project, conducted by researchers from Kansas State University and the National Wind Coordinating Collaborative, to assess the effects of wind energy development in Kansas on the

  12. EA-1764: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE) Marcell Experimental Forest, Itasca County, Minnesota

  13. EA-1774-S1: Final Environmental Assessment and Finding of No...

    Office of Environmental Management (EM)

    EA-1774-S1: Final Environmental Assessment and Finding of No Significant Impact Energy Conservation Program: Energy Conservation Standards for Direct Heating Equipment (November ...

  14. EA-1541: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41: Final Environmental Assessment EA-1541: Final Environmental Assessment Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory This Environmental...

  15. Environmental assessment, Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)

  16. Final Environmental Assessment Sleeping Giant Hydropower Project

    Energy Savers [EERE]

    Environmental Assessment Sleeping Giant Hydropower Project Montana Area Office Great Plains Region November 2015 Adopted 1/11/2016 by Western Area Power Administration as DOE/EA-2022 Final Environmental Assessment Sleeping Giant Hydropower Project Table of Contents (Page 1 of 3) CHAPTER 1 - INTRODUCTION .................................................................................................................... 1 PROPOSED ACTION

  17. EA-1736: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, New Mexico

  18. EA-1310: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory

  19. Tank Farm Closure & Waste Management Environmental Impact Statement <br>

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DOE/EIS-0391) - Hanford Site Statements Tank Closure & WM EIS Info Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA - Environmental Impact Statements Environmental Management Performance Reports Tank Farm Closure & Waste Management Environmental Impact Statement (DOE/EIS-0391) Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size The U.S. Department of Energy (USDOE) has prepared a Final Environmental

  20. Environmental Assessment Fact Sheet - Public Participation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    invites public comment on the draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. This document examines potential environmental consequences of conducting scientific experiments at the Waste Isolation Pilot Plant (WIPP). To facilitate public understanding of the proposed experiments and of the DOE's findings in the environmental assessment, the Carlsbad Field Office has scheduled two public meetings in New Mexico, one in Santa Fe and