National Library of Energy BETA

Sample records for assessment proposed upgrade

  1. Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document

    SciTech Connect (OSTI)

    NONE

    1997-02-04

    In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

  2. Moving Multifamily Buildings From Assessments to Upgrades

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Multifamily Peer Exchange Call: Moving Multifamily Buildings from Assessments to Upgrades, call slides and discussion summary, January 24, 2013.

  3. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) PDF icon Update to Plains & Eastern Clean ...

  4. Proposal to upgrade the MIPP data acquisition system

    SciTech Connect (OSTI)

    Baker, W.; Carey, D.; Johnstone, C.; Kostin, M.; Meyer, H.; Raja, R.; /Fermilab

    2005-03-01

    The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost effective scheme of upgrading the MIPP data acquisition speed to 3000 Hz.

  5. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 | Department of Energy Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy

  6. Environmental Assessment - Proposed Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for

  7. Request for Proposals for New or Upgraded Transmission Line Projects Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 | Department of Energy Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 FRN Request for

  8. QuikChill software for efficient chiller upgrade assessment

    SciTech Connect (OSTI)

    Rose, R.J.; Anderson, D.

    1998-07-01

    Chiller upgrades, required by recent CFC legislation, have not occurred in most large US facilities. Opportunities for compliance via efficient, correctly-sized chillers is significant, but there is little industry infrastructure encouraging downsizing and maximum efficiency, nor are changeouts approached as investments. Upgrade performance analysis is either too simplistic (missing integration and downsizing opportunities) or too difficult, detailed, and expensive. A niche exists for dedicated tools that can be used for both early screening and more detailed final design analysis, including downsizing, system integration, and staging. QuickChill, a chiller upgrade analysis software tool, as developed by EPA's ENERGY STAR Buildings Program to address these issues. It performs economic and energy analyses of potential centrifugal chiller upgrades using minimal information, and performs more accurate calculations as the quality and detail or inputs are increased. QuikChill assesses the consolidation of existing chillers, integration/staging of new chillers, and refrigerant conversion retrofits. QuikChill was designed for facility managers and consulting engineers facing CFC phaseouts. Rather than require time-consuming, detailed building shell and operational inputs, QuikChill estimates loads using DOE2-generated curves which plot the relationship between cooling load and outdoor temperature. Surprisingly, these curves reasonably predict annual cooling system operating requirements when used with local hourly temperatures and the peak load met by the existing system. Hourly temperature data is available for over 240 locations and users can easily supply peak information. QuikChill's combination of simplified inputs, investment-orientation, and unique approach to hourly cooling load estimation help fill an analytical void for the post-CFC chiller industry.

  9. EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the facilities of the U.S. Department of Energy's National Synchrotron Light Source Complex, namely the National Synchrotron...

  10. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  11. Moving Multifamily Buildings From Assessments to Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Commercial and Multifamily Building Benchmarking and Disclosure Assessing Revenue Streams: What Is Right for Your Program? Shared Space vs. In-Unit ...

  12. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    SciTech Connect (OSTI)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0).

  13. UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED...

    Broader source: Energy.gov (indexed) [DOE]

    ... Arkansas, and Tennessee Source: Clean Line Energy Partners, as of August 15, 2011 b. ... in the Proposal, the SERC region will grow by 1.69% per annum over the next 10 years. ...

  14. Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Document details a the draft environmental assessment for proposed rule 10 CFR Part 433, Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings Download the draft environmental assessment for proposed rule

  15. Oklahoma State University proposed Advanced Technology Research Center. Environmental Assessment

    SciTech Connect (OSTI)

    1995-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) evaluating the construction and equipping of the proposed Advanced Technology Research Center (ATRC) at Oklahoma State University (OSU) in Stillwater, Oklahoma. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

  16. Quantitative fire risk assessment for a proposed tritium technology facility

    SciTech Connect (OSTI)

    Zeng, Y. )

    1991-01-01

    A new Tritium Technology Facility has been proposed for the Chalk River Laboratories to support fusion research and the commercial use of tritium. One of the major safety and licensing issues for the new facility raised by the internal Safety Review Committee is the potential hazard fire poses to it. Fire could cause a large release from tritium from the facility's metal tritide storage beds, resulting in conversion of elemental tritium (HT) into oxide tritium (HTO). The radiological hazard of HTO is {approximately}10,000 times higher than that of HT. Because of the potential significance of fire in the tritium facility, a quantitative fire risk assessment has been conducted for the proposed new facility. The frequency of a large tritium release due to a fire in the Tritium Technology Facility was assessed as being on the order of 10{sup {minus}5} per year, which satisfies the safety goal requirement of the facility.

  17. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    SciTech Connect (OSTI)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  18. Environmental assessment for operations, upgrades, and modifications in SNL/NM Technical Area IV

    SciTech Connect (OSTI)

    1996-04-01

    The proposed action for this EA for Sandia National Laboratories/New Mexico Technical Area IV, includes continuing existing operations, modification of an existing accelerator (Particle Beam Fusion Accelerator II) to support defnese-related Z-pinch experiments, and construction of two transformer oil storage tanks to support the expansion of the Advanced Pulsed Power Research Module, a single pulse accelerator. Based on the analyses in the EA, DOE believes that the proposed action is not a major federal action significantly affecting the quality of the human environment within the meaning of NEPA and CEQ NEPA implementing regulations in 40 CFR 1508.18 and 1508.27. Therefore, an environmental impact statement is not required, and a Finding of No Significant Impact is issued.

  19. A qualitative method proposal to improve environmental impact assessment

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Duarte, Oscar; Zamorano, Montserrat

    2013-11-15

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.

  20. Status of TMX upgrade diagnostics construction

    SciTech Connect (OSTI)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-07-20

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan.

  1. Peak Dose Assessment for Proposed DOE-PPPO Authorized Limits

    SciTech Connect (OSTI)

    Maldonado, Delis

    2012-06-01

    The Oak Ridge Institute for Science and Education (ORISE), a U.S. Department of Energy (DOE) prime contractor, was contracted by the DOE Portsmouth/Paducah Project Office (DOE-PPPO) to conduct a peak dose assessment in support of the Authorized Limits Request for Solid Waste Disposal at Landfill C-746-U at the Paducah Gaseous Diffusion Plant (DOE-PPPO 2011a). The peak doses were calculated based on the DOE-PPPO Proposed Single Radionuclides Soil Guidelines and the DOE-PPPO Proposed Authorized Limits (AL) Volumetric Concentrations available in DOE-PPPO 2011a. This work is provided as an appendix to the Dose Modeling Evaluations and Technical Support Document for the Authorized Limits Request for the C-746-U Landfill at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky (ORISE 2012). The receptors evaluated in ORISE 2012 were selected by the DOE-PPPO for the additional peak dose evaluations. These receptors included a Landfill Worker, Trespasser, Resident Farmer (onsite), Resident Gardener, Recreational User, Outdoor Worker and an Offsite Resident Farmer. The RESRAD (Version 6.5) and RESRAD-OFFSITE (Version 2.5) computer codes were used for the peak dose assessments. Deterministic peak dose assessments were performed for all the receptors and a probabilistic dose assessment was performed only for the Offsite Resident Farmer at the request of the DOE-PPPO. In a deterministic analysis, a single input value results in a single output value. In other words, a deterministic analysis uses single parameter values for every variable in the code. By contrast, a probabilistic approach assigns parameter ranges to certain variables, and the code randomly selects the values for each variable from the parameter range each time it calculates the dose (NRC 2006). The receptor scenarios, computer codes and parameter input files were previously used in ORISE 2012. A few modifications were made to the parameter input files as appropriate for this effort. Some of these changes

  2. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    SciTech Connect (OSTI)

    N /A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion

  3. Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement Reports & Tools...

  4. Economic Assessment for the Notice of Proposed Rule Making for 10 CFR 850

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 850, Chronic Beryllium Disease Prevention Program, Notice of Proposed Rulemaking and the accompanying Economic Assessment.

  5. Assessment of Facilities, Materials, and Wastes Proposed for...

    Office of Environmental Management (EM)

    for Environmental Management (EM-1) invited the DOE ... National Nuclear Security Administration (NNSA) to propose facilities and legacy waste for transfer to Environmental ...

  6. Quantitative assessment of proposals on assurance of nuclear fuel supply

    SciTech Connect (OSTI)

    Tanaka, T.; Kuno, Y.; Tanaka, S.

    2013-07-01

    The assurance of nuclear fuel supply has the potential to contribute to balancing peaceful use of nuclear power and nuclear nonproliferation. 5 proposals which provide the backup supply of the enrichment service in case of supply disruption, are investigated in this study. We investigated the 20 NPT countries which are non-nuclear-weapon states and possess operable commercial LWRs in October 2012 as potential participants for each proposal. As a result of literature researching, we have extracted factors that can be considered as important for a country to participate or not participate in the assurance of nuclear fuel supply. Then we have computed incentive and disincentive parameters for each country. The results show that the participation expectancy decreases in the order of IAEA Fuel Bank proposal, Russian LEU Reserve proposal, AFS proposal, WNA proposal and 6-Country proposal. The 'IAEA fuel bank proposal' would be triggered in case of the supply disruption which cannot be solved by the market mechanism and bilateral agreements.

  7. Proposed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposed Settlement for Hanford Cleanup U.S. Department of Energy ● Washington State Department of Ecology * U.S. Environmental Protection Agency What's this proposed settlement about? Public Comment The Tri-Party Agreement agencies want your feedback. The public comment period is from October 1 through December 11, 2009. These new commitments would address important activities that are needed to protect human health and the environment. The settlement will impose a new, enforceable and

  8. The Role Risk Assessments Have Played in Proposed CERCLA Decision...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applicable Relevant and Appropriate Requirements Examples: Clean Water Act, Safe Drinking Water Act, Air Emissions Regulations * Policy * Risk Assessment * Risk Management *...

  9. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  10. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  11. Home Upgrades: Leveraging HVAC Upgrades for Greater Impact (201)

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Home Upgrades: Leveraging HVAC Upgrades for Greater Impact (201), November 18, 2015.

  12. Financing Small Business Upgrades

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Financing Peer Exchange Call: Financing Small Business Upgrades, call slides and discussion summary, October 25, 2012.

  13. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  14. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  15. EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

  16. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-,

  17. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Citation Details In-Document Search Title: Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading

  18. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  19. Functional performance requirements for seismic network upgrade

    SciTech Connect (OSTI)

    Lee, R.C.

    1991-08-18

    The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protection (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.

  20. Capturing Energy Upgrades

    Broader source: Energy.gov [DOE]

    Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

  1. DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – The Energy Department recently signed a notice of intent to prepare an environmental assessment to analyze the potential environmental impacts from a proposed project to accept used nuclear fuel from the Federal Republic of Germany at DOE’s Savannah River Site (SRS) for processing and disposition.

  2. Environmental Assessment for Proposed Rule 10 CFR Parts 433 and 435

    Broader source: Energy.gov [DOE]

    Document details the environmental assessment for Proposed Rule 10 CFR Part 433, Sustainable Design and Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR Part 435, Sustainable Design and Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings (DOE/EA-1463).

  3. Hydrocarbonaceous material upgrading method

    SciTech Connect (OSTI)

    Brecher, Lee E.; Mones, Charles G.; Guffey, Frank D.

    2015-06-02

    A hydrocarbonaceous material upgrading method may involve a novel combination of heating, vaporizing and chemically reacting hydrocarbonaceous feedstock that is substantially unpumpable at pipeline conditions, and condensation of vapors yielded thereby, in order to upgrade that feedstock to a hydrocarbonaceous material condensate that meets crude oil pipeline specification.

  4. NSLS control system upgrade

    SciTech Connect (OSTI)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-12-31

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans.

  5. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  6. Microsoft PowerPoint - ATLAS_upgrade_physics_program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guy Savard Argonne National Laboratory and University of Chicago Science with the ATLAS Efficiency and Intensity Upgrade ATLAS Users Meeting August 8-9 2009 2 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 Outline Evolving landscape for low-energy nuclear physics Self-assessment of ATLAS present and near future program Process followed to evaluate near and longer term physics program needs and role in community Option proposed - Physics - Machine - Instrumentation 3 G. Savard 2009 ATLAS

  7. Energy Upgrade California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified...

  8. Proposed Fermilab fixed target experiment: Kaons at the Tevatron. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0898, evaluating the impacts associated with the proposed fixed target experiment at the Fermi National Accelerator Laboratory (Femilab) in Batavia, Illinois, known as Kaons at the Tevatron (KTeV). The proposed KTeV project includes reconfiguration of an existing target station, enhancement of an existing beam transport system connected to existing utility facilities, and construction of a new experimental detector hall area. The study of the K meson, a type of subatomic particle, has been going on at Fermilab for 20 years. The proposed KTEV project advances the search for the origins of a violation of a fundamental symmetry of nature called charge parity (CP) violation. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

  9. Proposed Testing to Assess the Accuracy of Glass-To-Metal Seal Stress Analyses.

    SciTech Connect (OSTI)

    Chambers, Robert S.; Emery, John M; Tandon, Rajan; Antoun, Bonnie R.; Stavig, Mark E.; Newton, Clay S.; Gibson, Cory S; Bencoe, Denise N.

    2014-09-01

    The material characterization tests conducted on 304L VAR stainless steel and Schott 8061 glass have provided higher fidelity data for calibration of material models used in Glass - T o - Metal (GTM) seal analyses. Specifically, a Thermo - Multi - Linear Elastic Plastic ( thermo - MLEP) material model has be en defined for S S304L and the Simplified Potential Energy Clock nonlinear visc oelastic model has been calibrated for the S8061 glass. To assess the accuracy of finite element stress analyses of GTM seals, a suite of tests are proposed to provide data for comparison to mo del predictions.

  10. Environmental impact assessment in Colombia: Critical analysis and proposals for improvement

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Zamorano, Montserrat

    2010-07-15

    The evaluation of Environmental Impact Assessment (EIA) systems is a highly recommended strategy for enhancing their effectiveness and quality. This paper describes an evaluation of EIA in Colombia, using the model and the control mechanisms proposed and applied in other countries by Christopher Wood and Ortolano. The evaluation criteria used are based on Principles of Environmental Impact Assessment Best Practice, such as effectiveness and control features, and they were contrasted with the opinions of a panel of Colombian EIA experts as a means of validating the results of the study. The results found that EIA regulations in Colombia were ineffective because of limited scope, inadequate administrative support and the inexistence of effective control mechanisms and public participation. This analysis resulted in a series of recommendations regarding the further development of the EIA system in Colombia with a view to improving its quality and effectiveness.

  11. Common-Cause Failure Treatment in Event Assessment: Basis for a Proposed New Model

    SciTech Connect (OSTI)

    Dana Kelly; Song-Hua Shen; Gary DeMoss; Kevin Coyne; Don Marksberry

    2010-06-01

    Event assessment is an application of probabilistic risk assessment in which observed equipment failures and outages are mapped into the risk model to obtain a numerical estimate of the events risk significance. In this paper, we focus on retrospective assessments to estimate the risk significance of degraded conditions such as equipment failure accompanied by a deficiency in a process such as maintenance practices. In modeling such events, the basic events in the risk model that are associated with observed failures and other off-normal situations are typically configured to be failed, while those associated with observed successes and unchallenged components are assumed capable of failing, typically with their baseline probabilities. This is referred to as the failure memory approach to event assessment. The conditioning of common-cause failure probabilities for the common cause component group associated with the observed component failure is particularly important, as it is insufficient to simply leave these probabilities at their baseline values, and doing so may result in a significant underestimate of risk significance for the event. Past work in this area has focused on the mathematics of the adjustment. In this paper, we review the Basic Parameter Model for common-cause failure, which underlies most current risk modelling, discuss the limitations of this model with respect to event assessment, and introduce a proposed new framework for common-cause failure, which uses a Bayesian network to model underlying causes of failure, and which has the potential to overcome the limitations of the Basic Parameter Model with respect to event assessment.

  12. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, R.; Biddy, M.; Jones, S.

    2013-03-01

    This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

  13. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  14. Proposal of an environmental performance index to assess solid waste treatment technologies

    SciTech Connect (OSTI)

    Goulart Coelho, Hosmanny Mauro; Lange, Lisete Celina; Coelho, Lineker Max Goulart

    2012-07-15

    Highlights: Black-Right-Pointing-Pointer Proposal of a new concept in waste management: Cleaner Treatment. Black-Right-Pointing-Pointer Development of an index to assess quantitatively waste treatment technologies. Black-Right-Pointing-Pointer Delphi Method was carried out so as to define environmental indicators. Black-Right-Pointing-Pointer Environmental performance evaluation of waste-to-energy plants. - Abstract: Although the concern with sustainable development and environment protection has considerably grown in the last years it is noted that the majority of decision making models and tools are still either excessively tied to economic aspects or geared to the production process. Moreover, existing models focus on the priority steps of solid waste management, beyond waste energy recovery and disposal. So, in order to help the lack of models and tools aiming at the waste treatment and final disposal, a new concept is proposed: the Cleaner Treatment, which is based on the Cleaner Production principles. This paper focuses on the development and validation of the Cleaner Treatment Index (CTI), to assess environmental performance of waste treatment technologies based on the Cleaner Treatment concept. The index is formed by aggregation (summation or product) of several indicators that consists in operational parameters. The weights of the indicator were established by Delphi Method and Brazilian Environmental Laws. In addition, sensitivity analyses were carried out comparing both aggregation methods. Finally, index validation was carried out by applying the CTI to 10 waste-to-energy plants data. From sensitivity analysis and validation results it is possible to infer that summation model is the most suitable aggregation method. For summation method, CTI results were superior to 0.5 (in a scale from 0 to 1) for most facilities evaluated. So, this study demonstrates that CTI is a simple and robust tool to assess and compare the environmental performance of different

  15. Energy Efficiency Upgrades in Multifamily Housing | Department...

    Energy Savers [EERE]

    Upgrades in Multifamily Housing Energy Efficiency Upgrades in Multifamily Housing Better Buildings Residential Network Case Study: Energy Efficiency Upgrades in Multifamily ...

  16. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  17. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  18. A light diet for a giant appetite: An assessment of China's proposed fluorescent lamp standard

    SciTech Connect (OSTI)

    Lin, Jiang

    2002-04-11

    Lighting has been one of the fastest growing electric end-uses in China over the last twenty years, with an average annual growth rate of 14%. Fluorescent lighting provides a significant portion of China's lighting need. In 1998, China produced 680 million fluorescent lamps, of which 420 million were linear fluorescent lamps of various diameters (T8 to T12). There are substantial variations both in energy efficiency and lighting performance among locally produced fluorescent lamps. Such variations present a perfect opportunity for policy intervention through efficiency standards to promote the adoption of more efficient fluorescent lamps in China. This paper analyzes China's proposed minimum efficiency standard for fluorescent lamps and presents an assessment of its likely impacts on China's lighting energy consumption and GHG emissions.

  19. Climate balance of biogas upgrading systems

    SciTech Connect (OSTI)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-15

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

  20. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  1. Accounting for uncertainty and risk in assessments of impacts for offshore oil and gas leasing proposals

    SciTech Connect (OSTI)

    Wildermann, R.; Beittel, R. )

    1993-01-01

    The Minerals Management Service (MMS) of the US Department of the Interior prepares an environmental impact statement (EIS) for each proposal to lease a portion of the Outer Continental Shelf (OCS) for oil and gas exploration and development. The nature, magnitude, and timing of the activities that would ultimately result from leasing are subject to wide speculation, primarily because of uncertainties about the locations and amounts of petroleum hydrocarbons that exist on most potential leases. These uncertainties create challenges in preparing EIS's that meet National Environmental Policy Act requirements and provide information useful to decision-makers. This paper examines the constraints that uncertainty places on the detail and reliability of assessments of impacts from potential OCS development. It further describes how the MMS accounts for uncertainty in developing reasonable scenarios of future events that can be evaluated in the EIS. A process for incorporating the risk of accidental oil spills into assessments of expected impacts is also presented. Finally, the paper demonstrates through examination of case studies how a balance can be achieved between the need for an EIS to present impacts in sufficient detail to allow a meaningful comparison of alternatives and the tendency to push the analysis beyond credible limits.

  2. Financing Multifamily Energy Efficiency Upgrades | Department...

    Energy Savers [EERE]

    Multifamily Energy Efficiency Upgrades Financing Multifamily Energy Efficiency Upgrades Better Buildings Residential Network Peer Exchange Call Series: Financing Multifamily Energy ...

  3. CRYOGENICS IN BEPCII UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.; WANG,L.; LI,S.

    2002-07-22

    THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

  4. RHIC LUMINOSITY UPGRADE PROGRAM

    SciTech Connect (OSTI)

    Fischer, W.

    2010-05-23

    The Relativistic Heavy Ion Collider (RHIC) operates with either ions or polarized protons. After increasing the heavy ion luminosity by two orders of magnitude since its commissioning in 2000, the current luminosity upgrade program aims for an increase by another factor of 4 by means of 3D stochastic cooling and a new 56 MHz SRF system. An Electron Beam Ion Source is being commissioned that will allow the use of uranium beams. Electron cooling is considered for collider operation below the current injection energy. For the polarized proton operation both luminosity and polarization are important. In addition to ongoing improvements in the AGS injector, the construction of a new high-intensity polarized source has started. In RHIC a number of upgrades are under way to increase the intensity and polarization transmission to 250 GeV beam energy. Electron lenses will be installed to partially compensate the head-on beam-beam effect.

  5. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    SciTech Connect (OSTI)

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  6. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    SciTech Connect (OSTI)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  7. EA-1533: Floodplain Assessment | Department of Energy

    Energy Savers [EERE]

    Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This ... upgrade of the distribution system within plant boundaries and the construction of a ...

  8. Home Upgrades: Leveraging HVAC Upgrades for Greater Impact (201...

    Office of Environmental Management (EM)

    More Documents & Publications Where Do We Go From Here? The Changing Landscape of Residential Energy Efficiency (201) Staged Upgrades as a Strategy for Residential Energy ...

  9. Upgrading residual oil

    SciTech Connect (OSTI)

    Angevine, P.J.; Stein, T.R.

    1982-04-13

    Residual oil fractions are upgraded in that Conradson Carbon Residue (CCR) is selectively removed without undue hydrogen consumption by hydroprocessing with a catalyst comprising a single metal such as molybdenum, tungsten, nickel, iron or palladium or multimetallic combination of such metals, excluding, however, active desulfurization compositions such as nickel molybdenum and nickel-tungsten. Said catalyst is characterized as having greater than about 50% of its pore volume contribution in pores having diameters in the range of between about 100 and 200 angstroms. The product of such hydroprocessing is a particularly preferable feedstock for coking to give more liquid yield and less coke make.

  10. LHC detector upgrades

    SciTech Connect (OSTI)

    Dan Green

    2003-09-15

    The LHC detectors are well into their construction phase. The LHC schedule shows first beam to ATLAS and CMS in 2007. Because the LHC accelerator has begun to plan for a ten fold increase in LHC design luminosity (the SLHC or super LHC) it is none too soon to begin to think about the upgrades which will be required of the present LHC detectors. In particular, the tracking systems of ATLAS and CMS will need to be completely rebuilt. Given the time needed to do the R & D, make prototypes, and construct the new detectors and given the accelerator schedule for the SLHC, work needs to begin rather soon.

  11. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  12. Upgrading Troffer Luminaires to LED

    SciTech Connect (OSTI)

    none,

    2014-01-31

    Solid-state lighting technology fact sheet providing guidance on the various factors to consider when deciding on an LED upgrade for a fluorescent troffer system.

  13. upgrade | OpenEI Community

    Open Energy Info (EERE)

    by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have...

  14. Financing Multifamily Energy Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Financing Multifamily Energy Efficiency Upgrades, Call Slides and Discussion Summary, February 12, 2015.

  15. A critical assessment of the Macau government's proposed Post-2010 regulatory regime

    SciTech Connect (OSTI)

    Woo, C.K.; Horowitz, Ira; Tishler, Asher

    2009-04-15

    Last September, the Macau government issued a Public Consultation Paper proposing the introduction of competition into generation and transmission. An analysis suggests that fully adopting this proposal may lead to less-reliable service without the compensating benefits of lower costs and rates. (author)

  16. DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF...

    Office of Environmental Management (EM)

    ... Assessment, Fort Gordon Drop Zone, Mr. Robert Drumm, Chief, Natural Resource Branch, ... Fort Stewart, Hunter Army Airfield Field, 2008, Sustainable Range Field Card, ...

  17. Risk assessment of CST-7 proposed waste treatment and storage facilities Volume I: Limited-scope probabilistic risk assessment (PRA) of proposed CST-7 waste treatment & storage facilities. Volume II: Preliminary hazards analysis of proposed CST-7 waste storage & treatment facilities

    SciTech Connect (OSTI)

    Sasser, K.

    1994-06-01

    In FY 1993, the Los Alamos National Laboratory Waste Management Group [CST-7 (formerly EM-7)] requested the Probabilistic Risk and Hazards Analysis Group [TSA-11 (formerly N-6)] to conduct a study of the hazards associated with several CST-7 facilities. Among these facilities are the Hazardous Waste Treatment Facility (HWTF), the HWTF Drum Storage Building (DSB), and the Mixed Waste Receiving and Storage Facility (MWRSF), which are proposed for construction beginning in 1996. These facilities are needed to upgrade the Laboratory`s storage capability for hazardous and mixed wastes and to provide treatment capabilities for wastes in cases where offsite treatment is not available or desirable. These facilities will assist Los Alamos in complying with federal and state requlations.

  18. Environmental Assessment for the proposed modification and continued operation of the DIII-D facility

    SciTech Connect (OSTI)

    NONE

    1995-07-01

    The EA evaluates the proposed action of modifying the DIII-D fusion facility and conducting related research activities at the GA San Diego site over 1995-1999 under DOE contract number DE-ACO3-89ER51114. The proposed action is need to advance magnetic fusion research for future generation fusion devices such as ITER and TPX. It was determined that the proposed action is not a major action significantly affecting the quality of the human environment according to NEPA; therefore a finding of no significant impact is made and an environmental impact statement is not required.

  19. Upgrading the ATLAS control system

    SciTech Connect (OSTI)

    Munson, F.H.; Ferraretto, M.

    1993-09-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ``in-house`` software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed.

  20. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  1. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating...

  2. Energy Efficiency Upgrades Help Build Better Neighborhoods |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the...

  3. Steam-system upgrades | Open Energy Information

    Open Energy Info (EERE)

    upgrades Jump to: navigation, search TODO: Add description List of Steam-system upgrades Incentives Retrieved from "http:en.openei.orgwindex.php?titleSteam-systemupgrades&old...

  4. Energy Efficiency Upgrades for Sanitation Facilities Selawik...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selawik Sanitation Facilities 1970s Original Facility 1984 Renovations 1997 Improvements 2000- 2002 Upgrades 2005- 2008 WTP Rehab 2011 Current Energy Upgrades 2014 What's Next? ...

  5. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Energy Savers [EERE]

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production of ...

  6. Financing Small Business Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Small Business Upgrades Financing Small Business Upgrades Better Buildings Neighborhood ... Exchange Kickoff Call Strategies for Marketing and Driving Demand for Commercial ...

  7. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating ...

  8. Technology Assessment Tool - An Application of Systems Engineering to USDOE Technology Proposals

    SciTech Connect (OSTI)

    Rynearson, Michael Ardel

    1999-06-01

    This paper discusses the system design for a Technology Assessment (TA) tool that can be used to quantitatively evaluate new and advanced technologies, products, or processes. Key features of the tool include organization of information in an indentured hierarchy; questions and categories derived from the decomposition of technology performance; segregation of life-cycle issues into six assessment categories; and scoring, relative impact, and sensitivity analysis capability. An advantage of the tool's use is its ability to provide decision analysis data, based on incomplete or complete data.

  9. The RHIC polarized source upgrade

    SciTech Connect (OSTI)

    Zelenski, A.; Atoian, G.; Davydenko, V.; Ivanov, A.; Kolmogorov, A.; Ritter, J.; Steski, D.; Zubets, V.

    2010-09-27

    The RHIC polarized H{sup -} ion source is being upgraded to higher intensity (5-10 mA) and polarization for use in the RHIC polarization physics program at enhanced luminosity RHIC operation. The higher beam peak intensity will allow reduction of the transverse beam emittance at injection to AGS to reduce polarization losses in AGS. There is also a planned RHIC luminosity upgrade by using the electron beam lens to compensate the beam-beam interaction at collision points. This upgrade is also essential for future BNL plans for a high-luminosity electron - proton (ion) Collider eRHIC.

  10. EA-1533: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This ... System Upgrade, Pantex Plant, Amarillo, Texas, DOEEA-1533 (August 2005) More Documents ...

  11. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to

  12. ALS-U Update: BESAC Announces Results of Facility Upgrade Prioritization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALS-U Update: BESAC Announces Results of Facility Upgrade Prioritization ALS-U Update: BESAC Announces Results of Facility Upgrade Prioritization Print by Dave Robin, on behalf of the ALS-U Project Development Team On Thursday, June 9, DOE's Basic Energy Sciences Advisory Committee (BESAC) released the recommendations of the BES Facility Upgrade Prioritization Subcommittee. I'm pleased to announce that the subcommittee (whose full report can be found here) considers the proposed ALS-U project

  13. Protection Upgrades Project (4580)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  14. Conversion Technologies for Advanced Biofuels - Carbohydrates Upgrading |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Upgrading Conversion Technologies for Advanced Biofuels - Carbohydrates Upgrading PNNL report-out presentation at the CTAB webinar on carbohydrates upgrading. ctab_webinar_carbohydrates_upgrading.pdf (583.49 KB) More Documents & Publications Advanced Conversion Roadmap Workshop Conversion Technologies for Advanced Biofuels - Carbohydrates Production Innovative Topics for Advanced Biofuels

  15. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  16. User and Performance Impacts from Franklin Upgrades

    SciTech Connect (OSTI)

    He, Yun

    2009-05-10

    The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

  17. Staged Upgrades — Homeowner-focused Strategies for Encouraging Energy Upgrades over Time

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Staged Upgrades — Homeowner-Focused Strategies for Encouraging Energy Upgrades over Time, call slides and discussion summary.

  18. Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading...

    Office of Environmental Management (EM)

    Oil Upgrading Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading PNNL report-out at the CTAB webinar on Bio-Oil Upgrading. ctabwebinarbiooilsupgrading.pdf ...

  19. Energy Upgrade California Drives Demand From Behind the Wheel...

    Energy Savers [EERE]

    Upgrade California Drives Demand From Behind the Wheel Energy Upgrade California Drives Demand From Behind the Wheel Photo of a trailer with the Energy Upgrade California logo and ...

  20. Staged Upgrades - Homeowner-focused Strategies for Encouraging...

    Office of Environmental Management (EM)

    Staged Upgrades - Homeowner-focused Strategies for Encouraging Energy Upgrades over Time Better Buildings Residential Network Peer Exchange Call Series: Staged Upgrades - ...

  1. Upgrading Orinoco Belt heavy oil

    SciTech Connect (OSTI)

    Aliantara, J.; Castillo, O.

    1982-05-01

    Petroleos de Venezuela, S.A. (PDVSA), in an effort to develop new oil resources, has undertaken a program to evaluate and develop the Orinoco Heavy Oil Belt, in the eastern part of Venezuela. Lagoven, S.A., a subsidiary of PDVSA, has been assigned the responsibility for developing and upgrading part of the Orinoco belt. This paper describes the most relevant aspects of Lagoven's first upgrading module, a facility that will convert Orinoco oil into a premium crude with a very high yield of products of great market demand.

  2. Assessment of Geochemical Environment for the Proposed INL Remote-Handled Low-Level Waste Disposal Facility

    SciTech Connect (OSTI)

    D. Craig Cooper

    2011-11-01

    Conservative sorption parameters have been estimated for the proposed Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Facility. This analysis considers the influence of soils, concrete, and steel components on water chemistry and the influence of water chemistry on the relative partitioning of radionuclides over the life of the facility. A set of estimated conservative distribution coefficients for the primary media encountered by transported radionuclides has been recommended. These media include the vault system, concrete-sand-gravel mix, alluvium, and sedimentary interbeds. This analysis was prepared to support the performance assessment required by U.S. Department of Energy Order 435.1, 'Radioactive Waste Management.' The estimated distribution coefficients are provided to support release and transport calculations of radionuclides from the waste form through the vadose zone. A range of sorption parameters are provided for each key transport media, with recommended values being conservative. The range of uncertainty has been bounded through an assessment of most-likely-minimum and most-likely-maximum distribution coefficient values. The range allows for adequate assessment of mean facility performance while providing the basis for uncertainty analysis.

  3. HOM Survey of the First CEBAF Upgrade Style Cavity Pair

    SciTech Connect (OSTI)

    Marhauser, Frank; Davis, G; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai; Wang, Haipeng

    2009-05-01

    The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

  4. Facility Upgrade - Cyclotron Institute - TAMU

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Cyclotron Institute Facility Upgrade White Paper Follow the links below to open the files, or right click and select "Save Target As..." to save the file to your computer. File Type File Size Adobe PDF 752 KB MS-Word 18840 KB Postscript 1660 KB

  5. CY2017 Proposal Submission Instructions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    proposal submission instructions CY2017 Proposal Submission Instructions A proposal is necessary for shot-time allocated on the Titan, Janus, and COMET laser platforms at the Jupiter Laser Facility (JLF). The CY2017 period is January through December 2017. JLF will be closed until March 2017 for maintenance and upgrades. Experiment time will be allotted in 4-week Experimental Run Periods, with one-week maintenance breaks between experiments. The schedule will be determined after proposals have

  6. EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

  7. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  8. Cyclotron Institute Upgrade Project - Facilities - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrade Overview / K150 Cyclotron / Light Ion Guide / Heavy Ion Guide / Negative Ion Source / CB-ECRIS Facility Upgrade White Paper Overview Picture of the experimental set up to measure beta-decay half-lives. On January 3, 2005 the Cyclotron Institute Upgrade Project (CIUP) began with the approval of the CIUP management plan by the Department of Energy Nuclear Physics Office. The project will extend to the first quarter of calendar year 2011. When completed, the upgraded facility will provide

  9. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    ... routing, and minimum transfer capability; ... There are grid requirements to ensure AC transient voltage ... nearby communities connected to the AC system and that AC ...

  10. FRN Request for Proposals for New or Upgraded Transmission Line...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Energy, Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585; or ... Nebraska, Nevada, New Mexico, North Dakota, South Dakota, Texas, Utah, and Wyoming. ...

  11. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ... Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ...

  12. Proposals for ITER Ion Cyclotron Reference Design Upgrades

    SciTech Connect (OSTI)

    Bosia, G.; Beaumont, B.; Bremond, S.; Vulliez, K.; Testoni, P.

    2005-09-26

    A possible issue for the ITER Ion Cyclotron Heating and Current Drive system is related to the high electric field (2 kV/mm parallel to B0) at which the array is planned to operate, which may be associated to a low dielectric rigidity of the of the vessel 'vacuum'. The combined effects are likely to set the upper limit to the RF power transfer efficiency to the plasma core. This paper addresses the problem of how to improve the power handling in the ITER IC launcher described in the ITER Final Design Report (FDR), to either operate at a significantly lower E-field in the torus vacuum or, alternatively, at a lower plasma coupling.

  13. A Proposal to Upgrade the Silicon Strip Detector

    SciTech Connect (OSTI)

    Matis, Howard; Michael, LeVine; Jonathan, Bouchet; Stephane, Bouvier; Artemios, Geromitsos; Gerard, Guilloux; Sonia, Kabana; Christophe, Renard; Howard, Matis; Jim, Thomas; Vi Nham, Tram

    2007-11-05

    The STAR Silicon Strip Detector (SSD) was built by a collaboration of Nantes, Strasbourg and Warsaw collaborators. It is a beautiful detector; it can provide 500 mu m scale pointing resolution at the vertex when working in combination with the TPC. It was first used in Run 4, when half the SSD was installed in an engineering run. The full detector was installed for Run 5 (the Cu-Cu run) and the operation and performance of the detector was very successful. However, in preparation for Run 6, two noisy ladders (out of 20) were replaced and this required that the SSD be removed from the STAR detector. The re-installation of the SSD was not fully successful and so for the next two Runs, 6 and 7, the SSD suffered a cooling system failure that allowed a large fraction of the ladders to overheat and become noisy, or fail. (The cause of the SSD cooling failure was rather trivial but the SSD could not be removed betweens Runs 6 and 7 due to the inability of the STAR detector to roll along its tracks at that time.)

  14. Assessment of Potential Flood Events and Impacts at INL's Proposed Remote-Handled Low-Level Waste Disposal Facility Sites

    SciTech Connect (OSTI)

    A. Jeff Sondrup; Annette L. Schafter

    2010-09-01

    Rates, depths, erosion potential, increased subsurface transport rates, and annual exceedance probability for potential flooding scenarios have been evaluated for the on-site alternatives of Idaho National Laboratorys proposed remote handled low-level waste disposal facility. The on-site disposal facility is being evaluated in anticipation of the closure of the Radioactive Waste Management Complex at the INL. An assessment of flood impacts are required to meet the Department of Energys Low-Level Waste requirements (DOE-O 435.1), its natural phenomena hazards assessment criteria (DOE-STD-1023-95), and the Radioactive Waste Management Manual (DOE M 435.1-1) guidance in addition to being required by the National Environmental Policy Act (NEPA) environmental assessment (EA). Potential sources of water evaluated include those arising from (1) local precipitation events, (2) precipitation events occurring off of the INL (off-site precipitation), and (3) increased flows in the Big Lost River in the event of a Mackay Dam failure. On-site precipitation events include potential snow-melt and rainfall. Extreme rainfall events were evaluated for the potential to create local erosion, particularly of the barrier placed over the disposal facility. Off-site precipitation carried onto the INL by the Big Lost River channel was evaluated for overland migration of water away from the river channel. Off-site precipitation sources evaluated were those occurring in the drainage basin above Mackay Reservoir. In the worst-case scenarios, precipitation occurring above Mackay Dam could exceed the dams capacity, leading to overtopping, and eventually complete dam failure. Mackay Dam could also fail during a seismic event or as a result of mechanical piping. Some of the water released during dam failure, and contributing precipitation, has the potential of being carried onto the INL in the Big Lost River channel. Resulting overland flows from these flood sources were evaluated for their

  15. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential ...

  16. Assessment of H-Coal process developments: impact on the performance and economics of a proposed commercial plant

    SciTech Connect (OSTI)

    Talib, A.; Gray, D.; Neuworth, M.

    1984-01-01

    This report assesses the performance of the H-Coal process, a catalytic direct liquefaction process, at a process development and large pilot-plant scale of operation. The assessment focused on the evaluation of operating results from selected long-term successful process development unit (PDU) and pilot plant runs made on Illinois No. 6 coal. The pilot plant has largely duplicated the product yield structure obtained during the PDU runs. Also, the quality of products, particularly liquid products, produced during the pilot plant run is quite comparable to that produced during the PDU runs. This confirms the scalability of the H-Coal ebullated-bed reactor system from a PDU-scale, 3 tons of coal per day, to a large pilot scale, 220 tons of coal per day, plant. The minor product yield differences, such as higher yields of C/sub 3/, C/sub 4/, and naphtha fractions, and lower yields of distillate oils obtained during pilot plant runs as compared to the PDU runs, will not impact the projected technical and economic performance of a first-of-a-kind commercial H-Coal plant. Thus, the process yield and operating data collected during the PDU operations provided an adequate basis for projecting the technical and economic performance of the proposed H-Coal commercial plant. 18 references, 9 figures, 56 tables.

  17. Mid-South Metallurgical Makes Electrical and Natural Gas System Upgrades to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reduce Energy Use and Achieve Cost Savings | Department of Energy Mid-South Metallurgical Makes Electrical and Natural Gas System Upgrades to Reduce Energy Use and Achieve Cost Savings Mid-South Metallurgical Makes Electrical and Natural Gas System Upgrades to Reduce Energy Use and Achieve Cost Savings This case study describes how Mid-South Metallurgical implemented several recommendations resulting from a plant-wide energy assessment from DOE's Industrial Assessment Center (IAC) at

  18. RHIC and its upgrade programmes.

    SciTech Connect (OSTI)

    Roser,T.

    2008-06-23

    As the first hadron accelerator and collider consisting of two independent superconducting rings RHIC has operated with a wide range of beam energies and particle species. After a brief review of the achieved performance the presentation will give an overview of the plans, challenges and status of machine upgrades, that range from a new heavy ion pre-injector and beam cooling at 100 GeV to a high luminosity electron-ion collider.

  19. Energy Efficiency Through Lighting Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chickasaw Nation Energy Efficiency Through Lighting Upgrades The Chickasaw Nation  The Chickasaw Nation consists of 13 counties in southeastern Oklahoma  Tribal enrollment exceeds 35,000  The Tribal headquarters complex is located in Ada, Oklahoma  The Division of Commerce operates 17 facilities which are included in this grant Chickasaw Nation Boundaries Main Objectives  Retrofit Casino Lighting to the most energy efficient option available  Reduce energy consumption and

  20. Energy Efficiency through Lighting Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Through Lighting Upgrades The Chickasaw Nation The Chickasaw Nation * The Chickasaw Nation consists of 13.5 counties in southeastern Oklahoma * Tribal enrollment exceeds 35,000 * The Tribal headquarters complex is located in Ada, Oklahoma * The Division of Commerce operates 17 facilities most of which are included in this grant Chickasaw Nation Boundaries Main Objectives * Retrofit Casino Lighting to the most energy efficient option available * Reduce energy consumption and energy bills by 30%

  1. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura

    2009-09-15

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  2. Qualitative assessment of the impacts of proposed system operating strategies to resident fish within selected Columbia River Reservoirs

    SciTech Connect (OSTI)

    Shreffler, D.K.; Geist, D.R.; Mavros, W.V.

    1994-01-01

    The Bonneville Power Administration (BPA), Bureau of Reclamation (BOR), and US Army Corps of Engineers (COE) are presently conducting the System Operation Review (SOR) for the Columbia River basin. The SOR began in 1990 and is expected to provide an operating strategy that will take into consideration multiple uses of the Columbia River system including navigation, flood control, irrigation, power generation, fish migration, fish and wildlife habitat, recreation, water supply, and water quality. This report provides descriptions of each of the non-modeled reservoirs and other specified river reaches. The descriptions focus on the distinct management goals for resident fish: biodiversity, species-specific concerns, and sport fisheries. In addition, this report provides a qualitative assessment of impacts to the resident fish within these reservoirs and river reaches from the 7 alternative system operating strategies. In addition to this introduction, the report contains four more sections. Section 2.0 provides the methods that were used. Reservoir descriptions appear in Section 3.0, which is a synthesis of our literature review and interviews with resident fish experts. Section 4.0 contains a discussion of potential impacts to fish within each of these reservoirs and river reaches from the 7 proposed system operating strategies. The references cited are listed in Section 5.0.

  3. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    SciTech Connect (OSTI)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  4. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  5. The Upgraded D0 detector

    SciTech Connect (OSTI)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; ,

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  6. Jefferson Lab awards upgrade contracts | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    awards upgrade contracts Jefferson Lab awards upgrade contracts Michael Schwartz Inside Business, January 9, 2009 Jefferson Lab announced last week it awarded three contracts worth approximately a combined $5 million as part of its planned $310 million upgrade that will double the power of its electron beam accelerator. The Newport News-based nuclear physics lab, known officially as the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility, received approval from DOE for the

  7. Research Laboratory Experiments with Energy Efficiency Upgrades...

    Office of Environmental Management (EM)

    Center for Applied Energy Research (CAER), the new facility includes energy efficiency upgrades that will reduce energy use and help the building achieve LEED Gold status. ...

  8. Upgrade Boilers with Energy-Efficient Burners

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  9. ALS-U Update: BESAC Announces Results of Facility Upgrade Prioritization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications ALS-U Update: BESAC Announces Results of Facility Upgrade Prioritization Print by Dave Robin, on behalf of the ALS-U Project Development Team On Thursday, June 9, DOE's Basic Energy Sciences Advisory Committee (BESAC) released the recommendations of the BES Facility Upgrade Prioritization Subcommittee. I'm pleased to announce that the subcommittee (whose full report can be found here) considers the proposed ALS-U project "absolutely central" to contribute to world leading

  10. Staged Upgrades - Homeowner-focused Strategies for Encouraging Energy Upgrades over Time

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exchange Call: Staged Upgrades-Homeowner-focused Strategies for Encouraging Energy Upgrades over Time August 20, 2015 Call Slides and Discussion Summary Agenda  Call Logistics  Residential Network and Peer Exchange Call Overview  Update on Staged Upgrades Initiative, Steve Dunn, U.S. DOE  Poll on Staged Upgrade Resources  Featured Speakers:  Patrick Hunt, Fiveworx  David Hatchimonji, Boulder County (CO) (Network Member)  Discussion  What are effective "entry

  11. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  12. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  13. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  14. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  15. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  16. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L.

    1998-03-12

    This SARP Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  17. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  18. Better Buildings Neighborhood Program Data Upgrade Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, and to protect privacy, data for some upgraded homes have been omitted.

  19. EA-1534: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan

  20. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  1. Upgrading of heavy hydrocarbonaceous feeds

    SciTech Connect (OSTI)

    Bhattacharya, A.K.; Storm, D.A.; DeRosa, T.F.

    1995-12-31

    This paper is based on our work in the area of upgrading of heavy hydrocarbonaceous feedstocks. The work involves the development of a method of catalytically hydroconverting a hydrocarbon feed stream containing a substantial quantity of components boiling above about 538{degrees}C to a substantial portion thereof to components boiling below 538{degrees}C. More particularly, an oil-miscible or oil-soluble poly(ether)diol or a derivative thereof and an aromatic additive oil, such as Heavy Cycle Gas oil, are added to a heavy hydrocarbon feed and the mixed stream is contacted at elevated temperatures with a solid catalyst such as a sulfided nickel molybdenum oxide on alumina in the presence of hydrogen under pressure. This method advantageously affords higher conversion to more valuable liquid products containing lower amounts of heteroatoms such as sulfur, substantially eliminates plugging of the hydroconversion reactor, and reduces the amount of insolubles in the total liquid product.

  2. Venezuelan plant completes instrument upgrade

    SciTech Connect (OSTI)

    Martinez, H.; Garcia, C.O.

    1996-07-22

    The Lamarliquido LPG plant, offshore Lake Maracaibo, Venezuela, has received a major upgrade to its control system after 25 years of pneumatic instrumentation. The plant is now operating fully remote from a new central control room with a maximum production of 5,500 b/d, expected to go to 6,600 b/d. The phases of the project included installation and integration of four control systems: distributed control system; fire prevention, detection, and control system; refrigeration process turbocompressor control system; and emergency shutdown system. The paper describes the 1960s vintage instrumentation, the modernization objectives and phases, the distributed control system, the fire control system, gas and fire detection, the turbocompressor system, emergency shutdown system, and plant shutdown logic.

  3. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Berst, Kara; Howeth, Maria

    2013-02-26

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year's average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  4. Environmental Assessment and FONSI Proposed Decontamination and Disassembly of the Argonne Thermal Source Reactor (ATSR) at Argonne National Laboratory

    SciTech Connect (OSTI)

    N /A

    1998-07-15

    The purpose of this project is to protect human health and the environment from risks associated with the contaminated surplus ATSR. The proposed action is needed because the ATSR, a former experimental reactor, contains residual radioactivity and hazardous materials.

  5. Heavy oil and tar sands recovery and upgrading. International technology

    SciTech Connect (OSTI)

    Schumacher, M.M.

    1982-01-01

    This work provides an in-depth assessment of international technology for the recovery and upgrading of heavy crude oil and tar sands. The technologies included are currently in use, under development, or planned; emphasis is placed on post-1978 activities. The heavy oil technologies and processes considered include methods relating to the exploitation of heavy oil reservoirs, such as production from underground workings, all types of improved or enhanced recovery, subsurface extraction, and well rate stimulation. The tar sands section includes sizing the resource base and reviewing and evaluating past, present, and planned research and field developments on processes for mining, producing, extracting, and upgrading very heavy oils recovered from tar sands, e.g., bitumen recovery from tar sands where primary production was impossible because of the oil's high viscosity. 616 references.

  6. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  7. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  8. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer ...

  9. ATU Advanced Technology Upgrading Ltd | Open Energy Information

    Open Energy Info (EERE)

    Upgrading) Ltd Place: Israel Product: Focused on development of rechargeable magnesium battery. References: ATU (Advanced Technology Upgrading) Ltd1 This article is a stub. You...

  10. PERSONNEL PROTECTION SYSTEM UPGRADE FOR THE LCLS ELECTRON BEAM...

    Office of Scientific and Technical Information (OSTI)

    PERSONNEL PROTECTION SYSTEM UPGRADE FOR THE LCLS ELECTRON BEAM LINAC Citation Details In-Document Search Title: PERSONNEL PROTECTION SYSTEM UPGRADE FOR THE LCLS ELECTRON BEAM LINAC...

  11. EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES | Department of...

    Energy Savers [EERE]

    EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES In Santa Barbara County, California, the ... Financing: In addition to partnering with the statewide Energy Upgrade California program ...

  12. Capturing Energy Upgrades in the Real Estate Transaction | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the ...

  13. Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time This Better ...

  14. Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces ...

  15. Financing Energy Upgrades for K-12 School Districts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents ... 6 Chapter 1: Principles of Financing Energy Upgrades for Schools ...

  16. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What's Working in Residential Energy Efficiency Upgrade Programs - Promising Approaches and Lessons Learned What's Working in Residential Energy Efficiency Upgrade Programs - ...

  17. Standard Work Specifications for Single-Family Home Energy Upgrades...

    Energy Savers [EERE]

    stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. ...

  18. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What's Working in Residential Energy Efficiency Upgrade Programs Workshop, May 2011 What's Working in Residential Energy Efficiency Upgrade Programs Workshop, May 2011 On May 20, ...

  19. Find Financing for Energy Efficiency Upgrades | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building ...

  20. Employee-Focused Structure Helps Produce Upgrades for Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Employee-Focused Structure Helps Produce Upgrades for Contractor Employee-Focused Structure Helps Produce Upgrades for Contractor Photo of a young man sitting on a couch, looking ...

  1. Boiler Upgrades and Decentralizing Steam Systems Save Water and...

    Energy Savers [EERE]

    Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval ...

  2. THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...

    Energy Savers [EERE]

    designed to target communities with limited upgrade capacity and educate homeowners about the benefits of home energy upgrades. The LEAP program employed a paid membership ...

  3. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Environmental Management (EM)

    Algal Lipid Upgrading Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading ... chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. ...

  4. Energy Star Building Upgrade Value Calculator | Open Energy Informatio...

    Open Energy Info (EERE)

    Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) AgencyCompany...

  5. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy ...

  6. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    KELLY, D.L.

    1998-11-18

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool.

  7. HPSS Disk Cache Upgrade Caters to Capacity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Disk Cache Upgrade Caters to Capacity HPSS Disk Cache Upgrade Caters to Capacity Analysis of NERSC Users' Data-Access Habits Reveals Sweet Spot for Short-term Storage October 16, 2015 Contact: Kathy Kincade, +1 510 495 2124, kkincade@lbl.gov HPSS 09 vert NERSC users today are benefiting from a business decision made three years ago by the center's Storage Systems Group (SSG) as they were looking to upgrade the High-Performance Storage System (HPSS) disk cache: rather than focus primarily on

  8. Recovery and upgrading of heavy oil analyzed

    SciTech Connect (OSTI)

    Fornoff, L.L.; Van Driesen, R.P.; Viens, C.H.

    1980-10-13

    An analysis has been made of recovery and upgrading of Venezuelan heavy crudes by integrating steam-drive production data with an upgraded computer processing program. A study used 110 computer cases to analyze a project using Venezuelan heavy crude from the Jobo field with gravity of 9.2 API and 4.1% by wt sulfur for the base case. Sensitivity cases used 12.2 API oil from the Lot 9 field, Monagas state, Venezuela, with sulfur content of 2.3%. Four upgrading methods were studied (deasphalting, delayed coking, flexicoking, and LC-fining), all with favorable resulting economics.

  9. Characterization, propagation and analysis of aleatory and epistemic uncertainty in the 2008 performance assessment for the proposed repository for radioactive waste at Yucca Mountain, Nevada.

    SciTech Connect (OSTI)

    Helton, Jon Craig; Sallaberry, Cedric M.; Hansen, Clifford W.

    2010-10-01

    The 2008 performance assessment (PA) for the proposed repository for high-level radioactive waste at Yucca Mountain (YM), Nevada, illustrates the conceptual structure of risk assessments for complex systems. The 2008 YM PA is based on the following three conceptual entities: a probability space that characterizes aleatory uncertainty; a function that predicts consequences for individual elements of the sample space for aleatory uncertainty; and a probability space that characterizes epistemic uncertainty. These entities and their use in the characterization, propagation and analysis of aleatory and epistemic uncertainty are described and illustrated with results from the 2008 YM PA.

  10. UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-01-01

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

  11. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  12. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  13. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  14. Better Buildings Neighborhood Program Data Upgrade Projects ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building project data for 75,110 single-family homes upgraded between July 1, 2010, and September 30, 2013, are available. Reported data for some elements have been transformed, ...

  15. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  16. Process for upgrading heavy crude oils

    SciTech Connect (OSTI)

    Rankel, L. A.; Shu, P.

    1985-07-23

    A combination process of oxidation/mild coking and in-situ deasphalting provides a process wherein upgraded crude with high levels of demetalation and low solids rejection is produced.

  17. ATLAS upgrade June09_v3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it...

  18. Idaho Power- Easy Upgrades Efficiency Incentive Program

    Broader source: Energy.gov [DOE]

    Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to upgrade to more efficient equipment in their facilities. The utility provides rebates for lighting...

  19. System and process for upgrading hydrocarbons

    SciTech Connect (OSTI)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  20. HPSS Disk Cache Upgrade Caters to Capacity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPSS Disk Cache Upgrade Caters to Capacity Analysis of NERSC Users' Data-Access Habits Reveals Sweet Spot for Short-term Storage October 16, 2015 Contact: Kathy Kincade, +1 510 495 ...

  1. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES

    Broader source: Energy.gov [DOE]

    Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

  2. Upgrading the UES Measure List

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Present Value of Region Act's 10% Conservation Credit (kWh)" * Sequence of columns (reading left to right) does not follow logical thinking What We Propose * Improve...

  3. MMCR Upgrades: Present Status and Future Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital

  4. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-12-09

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  5. Why Energy Efficiency Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades How We Use Energy in Our Buildings Start with an Energy Evaluation Understand How Typical Home Energy Improvements Can Result in a Better Building Tools and Calculators for Homes Homes and commercial buildings consume 40% of the energy used in the United States. Of the $2,000 the average American spends paying for energy annually, $200 to $400 could be going to waste from drafts, air leaks around openings, and outdated heating and

  6. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    SciTech Connect (OSTI)

    Evans, K.; Woodside, D.; Bruegmann, M.

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  7. Heavy oil and tar sands recovery and upgrading: international technology

    SciTech Connect (OSTI)

    Schumacher, M.M.

    1982-01-01

    This book provides an in-depth assessment of international technology for the recovery and upgrading of heavy crude oil and tar sands. The technologies included are currently in use, under development, or planned; emphasis is placed on post-1978 activities. The heavy oil technologies and processes considered in Part I include methods relating to the exploitation of heavy oil reservoirs, such as production from undergorun workings, all types of improved or enhanced recovery, subsurface extraction, and well rate stimulation. Furthermore, even though heavy crudes are understood to include only those liquid or semiliquid hydrocarbons with a gravity of 20/sup 0/API or less, technology applied to lighter crude oils with in situ viscosities of the same order of magnitude as some US heavy oils is also included. The scope of the tar sands section (Part II) includes sizing the resource base and reviewing and evaluatin past, present, and planned research and field developments on processes for mining, producing, extracting, and upgrading very heavy oils recovered from tar sands, e.g., bitumen recovery from tar sands where primary production was impossible because of the oil's high viscosity. On the production side, very heavy oil is defined as having a gravity less than 10/sup 0/ to 12/sup 0/API and greater than 100,000-centipoise viscosity at 50/sup 0/F. On the upgrading side, hydrocarbons whose characteristics dictated additional processing prior to conventional refining into salable products (1050+/sup 0/ material) were included, regardless of origin, in order to encompass all pertinent upgrading technologies.

  8. Jefferson Lab awards upgrade contracts (Inside Business) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsreleasesjefferson-lab-awards-upgrade-contracts Submitted: Friday, January 9...

  9. Heavy oil development in Canada - The need for upgrading

    SciTech Connect (OSTI)

    Quinn, P.C.

    1987-01-01

    The author first reviews Canada's petroleum reserves, then summarizes the problem facing Canada regarding dwindling supplies of conventional light and medium crude oils and briefly describes Canada's refining capability. With that background, he attempts to analyze the problems that face heavy oil producers in attempting to market their product and propose a potential solution to these problems as illustrated by Husky Oil's approach - the construction of a heavy oil upgrader. He closes by sharing his views on the future of heavy oil development and the policy issues facing our governments.

  10. Floodplain Assessment for the Proposed Engineered Erosion Controls at TA-72 in Lower Sandia Canyon, Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Hathcock, Charles D.

    2012-08-27

    Los Alamos National Laboratory (LANL) is preparing to implement engineering controls in Sandia Canyon at Technical Area (TA) 72. Los Alamos National Security (LANS) biologists conducted a floodplain determination and this project is located within a 100-year floodplain. The proposed project is to rehabilitate the degraded channel in lower Sandia Canyon where it crosses through the outdoor firing range at TA-72 to limit the loss of sediment and dissipate floodwater leaving LANL property (Figure 1). The proposed construction of these engineered controls is part of the New Mexico Environment Department's (NMED) approved LANL Individual Storm Water Permit. The purpose of this project is to install storm water controls at Sandia Watershed Site Monitoring Area 6 (S-SMA-6). Storm water controls will be designed and installed to meet the requirements of NPDES Permit No. NM0030759, commonly referred to as the LANL Individual Storm Water Permit (IP). The storm water control measures address storm water mitigation for the area within the boundary of Area of Concern (AOC) 72-001. This action meets the requirements of the IP for S-SMA-6 for storm water controls by a combination of: preventing exposure of upstream storm water and storm water generated within the channel to the AOC and totally retaining storm water falling outside the channel but within the AOC.

  11. Energy Efficiency Upgrades in Multifamily Housing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades in Multifamily Housing Energy Efficiency Upgrades in Multifamily Housing Better Buildings Residential Network Case Study: Energy Efficiency Upgrades in Multifamily Housing. This case study addresses multifamily energy upgrade experiences by two members of the Better Buildings Residential Network-Elevate Energy and the International Center for Appropriate and Sustainable Technology (ICAST). Energy Efficiency Upgrades in Multifamily Housing (426.94 KB) More Documents

  12. Jefferson Lab accelerator upgrade completed: Initial operations set to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begin while experimental equipment upgrades continue | Jefferson Lab accelerator upgrade completed: Initial operations set to begin while experimental equipment upgrades continue Jefferson Lab accelerator upgrade completed: Initial operations set to begin while experimental equipment upgrades continue areial Aerial of Jefferson Lab NEWPORT NEWS, VA, August 12, 2014 - The Department of Energy's Thomas Jefferson National Accelerator Facility ("Jefferson Lab") has just received formal

  13. EA-1075: Proposed Casey's Pond Improvement Project, Batavia, Illinois

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposed system upgrade to meet improved operational criteria on the current Industrial Cooling Water distribution system used in the fixed target...

  14. Proposed method to calculate FRMAC intervention levels for the assessment of radiologically contaminated food and comparison of the proposed method to the U.S. FDA's method to calculate derived intervention levels

    SciTech Connect (OSTI)

    Kraus, Terrence D.; Hunt, Brian D.

    2014-02-01

    This report reviews the method recommended by the U.S. Food and Drug Administration for calculating Derived Intervention Levels (DILs) and identifies potential improvements to the DIL calculation method to support more accurate ingestion pathway analyses and protective action decisions. Further, this report proposes an alternate method for use by the Federal Emergency Radiological Assessment Center (FRMAC) to calculate FRMAC Intervention Levels (FILs). The default approach of the FRMAC during an emergency response is to use the FDA recommended methods. However, FRMAC recommends implementing the FIL method because we believe it to be more technically accurate. FRMAC will only implement the FIL method when approved by the FDA representative on the Federal Advisory Team for Environment, Food, and Health.

  15. Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics

    SciTech Connect (OSTI)

    Anderson, Jake; Whitmore, Juliana; /Fermilab

    2011-11-01

    We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

  16. Heavy oil. upgrading integrated with steam drive

    SciTech Connect (OSTI)

    Van Driesen, R.; Viens, C.H.; Fornoff, L.L.

    1980-01-01

    A study of the upgrading of heavy oil from a representative Venezuelan Jobo crude (9.2/sup 0/API, 4.1% sulfur, and 500 ppm total metals) from the Orinoco area involved 110 computer simulations based on a modified C-E Lummus Refinery Linear Program model on the assumptions of a 125,000 bbl/day refinery built, starting at 1979 prices, for completion by 1986 near the producing field to supply the fuel oil needed to provide oil field steam. All of the upgrading systems were economically attractive; the per cent return-on-investment (ROI) before taxes for the methods studied were: for Lummus LC-Fining, 135.9%; for Exxon's FLEXICOKING, 132.4%; for delayed coking, 119.2%; and for deasphalting, 106.5%. LC-Fining provided the best over-all combination of flexibility, product yield, product quality, and return on investment. The economics favored upgrading to the maximum extent possible; there was a reduction in the ROI for all the upgrading systems when product specifications were lowered from the premium base case (1.2% SO/sub 2/ emitted per million Btu fired). The premium upgraded heavy crude oils should be worth $3.00-$3.50/bbl more than comparable conventional crude oils, could be of up to 27/sup 0/API, and could be substituted, at up to 50%, for conventional crude oils in a typical U.S. refinery.

  17. DOE/EA-1519: Environmental Assessment for the Proposed Decontamination and Decommissioning of the Zero Power Reactors (Building 315) at Argonne National Laboratory (April 2005)

    SciTech Connect (OSTI)

    N /A

    2005-04-30

    The U.S. Department of Energy (DOE) is proposing to decontaminate and decommission the Zero Power Reactor (ZPR) facilities located in Building 315 at Argonne National Laboratory (ANL) in Argonne, Illinois (Figure 1-1). The proposed action would occur in two phases: ZPR-6 would be the focus of Phase I and ZPR-9 would be the focus of Phase II. DOE has prepared this environmental assessment (EA) in accordance with the National Environmental Policy Act (NEPA), 42 U.S.C. {section} 4321 et seq., and applicable regulations (Title 40, Code of Federal Regulations [CFR] Parts 1500-1508 and 10 CFR Part 1021). This section describes the reactors and their current status.

  18. EA-1906: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1906: Final Environmental Assessment Operations, Upgrades, and Consolidation at the Western Command Site, NM This NNSA EA evaluates the potential...

  19. Level-2 Calorimeter Trigger Upgrade at CDF

    SciTech Connect (OSTI)

    Flanagan, G.U.; /Purdue U.

    2007-04-01

    The CDF Run II Level-2 calorimeter trigger is implemented in hardware and is based on an algorithm used in Run I. This system insured good performance at low luminosity obtained during the Tevatron Run II. However, as the Tevatron instantaneous luminosity increases, the limitations of the current system due to the algorithm start to become clear. In this paper, we will present an upgrade of the Level-2 calorimeter trigger system at CDF. The upgrade is based on the Pulsar board, a general purpose VME board developed at CDF and used for upgrading both the Level-2 tracking and the Level-2 global decision crate. This paper will describe the design, hardware and software implementation, as well as the advantages of this approach over the existing system.

  20. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J. ); Germain, R.R. )

    1989-01-01

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulphur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional projects, also based on hydrogenation, will use ebullated bed catalyst systems; the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  1. Bitumen and heavy oil upgrading in Canada

    SciTech Connect (OSTI)

    Chrones, J.

    1988-06-01

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulfur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgrader, now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional products, also based on hydrogenation, will use ebullated bed catalyst systems: the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.

  2. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by ALS management, appropriate to the proposal. Rapid Access Proposals (RA) A proportion of beam time on some beamlines is reserved to provide rapid access for simple,...

  3. The LANSCE RICE control system upgrade.

    SciTech Connect (OSTI)

    Oothoudt, Michael; Schaller, S.; Bjorklund, E. A.; Burns, M. J.; Carr, G.; Carr, G.; Faucett, John Allen,; Hayden, D. J.; Lusk, M. D.; Merl, R. B.; Potter, J. M.; Reynolds, J. A.; Romero, D. B.; Shelley, F. E.

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  4. Energy Upgrade of the Siam Photon Source

    SciTech Connect (OSTI)

    Rugmai, S.; Rujirawat, S.; Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P.

    2007-01-19

    The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

  5. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RAPIDD Proposals RAPIDD Proposals Print Tuesday, 21 August 2012 14:41 The combined process for Rapid Access Proposals, Industry, and Director's Discretion (RAPIDD) beam time accommodates users who require limited or rapid access to ALS beam time. There are a number of proposal types that are available on a variety of beamlines, as described below. Log in to ALSHub to submit a RAPIDD proposal. The RAPIDD process is not suitable for users requiring significant beam time for an extended program of

  6. Interior Foundation Insulation Upgrade - Madison

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Madison Residence Madison, WI PROJECT INFORMATION Private residence, basement renovation Madison, WI Builder: TDS Custom Construction, Madison WI Designer: Moisture / thermal management: TDS Custom Construction Architectural: John Gibson, Gibson/Darr Architects Building Component: Envelope: Foundation W all Application: Single family home, retrofit (also suitable for multi-family) Project year: 2011 Climate Zone 6A (applicable to most climate zones. Termite risk must be assessed) PERFORMANCE

  7. Final Systems Development Report for the Clark County Socioeconomic Impact Assessment of the Proposed High-Level Nuclear Waste Repository at Yucca Mountain, NV

    SciTech Connect (OSTI)

    1992-06-18

    The Systems Development Report represents the third major step in the Clark County Socioeconomic Impact Assessment of the Proposed High-Level Nuclear Waste Repository at Yucca Mound Nevada. The first of these steps was to forge a Research Design that would serve as a guide for the overall research process. The second step was the construction of the Base Case, the purpose of which was to describe existing conditions in Clark County in the specified analytic areas of Economic-Demographic/Fiscal, Emergency Planning and Management, Transportation and Sociocultural analysis. The base case description will serve as a basis for assessing changes in these topic areas that might result from the Yucca Mountain project. These changes will be assessed by analyzing conditions with and without repository development in the county. Prior to performing such assessments, however, the snapshot type of data found in the base case must be operationalized or systematized to allow for more dynamic data utilization. In other words, a data system that can be used to analyze the consequences of the introduction of different variables (or variable values) in the Clark County context must be constructed. Such a system must be capable of being updated through subsequent data collection and monitoring efforts to both provide a rolling base case and supply information necessary to construct trend analyses. For example, during the Impact Assessment phase of the study process, the without repository analysis is accomplished by analyzing growth for the county given existing conditions and likely trends. These data are then compared to the with Yucca Mountain project conditions anticipated for the county. Similarly, once the emergency planning management and response needs associated with the repository are described, these needs will be juxtaposed against existing (and various future) capacity(ies) in order to determine the nature and magnitude of impacts in this analytic area. Analogous tasks

  8. Honeymoons Lead to Upgrades in Western Vermont

    Broader source: Energy.gov [DOE]

    For homeowners who are hesitant to make energy efficiency upgrades, offering them a honeymoon might just be the motivation they need. NeighborWorks of Western Vermont (NWWVT) created a "honeymoon period" for its loan payments and has seen success by allowing homeowners to experience six months of comfort and energy savings before they begin making loan payments.

  9. Design of heavy oil upgrading units

    SciTech Connect (OSTI)

    Farrell, W.D.; Phodes, R.P.; Zeno, D.Y.

    1985-01-01

    Heavy oil upgrading has become an increasingly important aspect of ER and E's research. Due to high costs of experimental catalysts, small catalyst charges are used (20-150cc). Tubular design and tree-stage stirred design are discussed with emphasis on the techniques and equipment used to handle heavy oil. Mechanical design and fluid mechanics are discussed.

  10. T-Farm complex alarm upgrades

    SciTech Connect (OSTI)

    Roberts, J.B.

    1995-01-01

    The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

  11. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  12. ELECTRONICS UPGRADE OF HIGH RESOLUTION MASS SPECTROMETERS

    SciTech Connect (OSTI)

    Mcintosh, J; Joe Cordaro, J

    2008-03-10

    High resolution mass spectrometers are specialized systems that allow researchers to determine the exact mass of samples to four significant digits by using magnetic and electronic sector mass analyzers. Many of the systems in use today at research laboratories and universities were designed and built more than two decades ago. The manufacturers of these systems have abandoned the support for some of the mass spectrometers and parts to power and control them have become scarce or obsolete. The Savannah River National Laboratory has been involved in the upgrade of the electronics and software for these legacy machines. The Electronics Upgrade of High Resolution Mass Spectrometers consists of assembling high-end commercial instrumentation from reputable manufacturers with a minimal amount of customization to replace the electronics for the older systems. By taking advantage of advances in instrumentation, precise magnet control can be achieved using high resolution current sources and continuous feedback from a high resolution hall-effect probe. The custom equipment include a precision voltage divider/summing amplifier chassis, high voltage power supply chassis and a chassis for controlling the voltage emission for the mass spectrometer source tube. The upgrade package is versatile enough to interface with valve control, vacuum and other instrumentation. Instrument communication is via a combination of Ethernet and traditional IEEE-488 GPIB protocols. The system software upgrades include precision control, feedback and spectral waveform analysis tools.

  13. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  14. Biological Pyrolysis Oil Upgrading Presentation for BETO 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pyrolysis Oil Upgrading WBS 2.3.2.301 2015 DOE BioEnergy Technologies Office (BETO) ... * Tt-J Catalytic Upgrading of Bio-Oil Intermediates to Fuels and Chemicals ...

  15. Fractionation and Catalytic Upgrading of Bio-Oil Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office (BETO) 2015 Project Peer Review Fractionation and Catalytic Upgrading of Bio-Oil ... Deconstruction of Biomass to Form Bio-Oil Intermediates Tt-I. Catalytic Upgrading of ...

  16. Sandia Lightning Early Warning Network: Digital-based upgrade

    SciTech Connect (OSTI)

    Boyd, G.M.

    1994-05-01

    This report describes the layout and operation of the recently upgraded Sandia Lightning Early Warning Network, which was upgraded from an analog-based to a digital-based telemetry system.

  17. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J.R. Simplot: Burner Upgrade Project Improves Performance and Saves Energy at a Large Food Processing Plant J.R. Simplot: Burner Upgrade Project Improves Performance and Saves ...

  18. EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

  19. Structural analysis of fuel assembly clads for the Upgraded Transient Reactor Test Facility (TREAT Upgrade)

    SciTech Connect (OSTI)

    Ewing, T.F.; Wu, T.S.

    1986-01-01

    The Upgraded Transient Reactor Test Facility (TREAT Upgrade) is designed to test full-length, pre-irradiated fuel pins of the type used in large LMFBRs under accident conditions, such as severe transient overpower and loss-of-coolant accidents. In TREAT Upgrade, the central core region is to contain new fuel assemblies of higher fissile loadings to maximize the energy deposition to the test fuel. These fuel assemblies must withstand normal peak clad temperatures of 850/sup 0/C for hundreds of test transients. Due to high temperatures and gradients predicted in the clad, creep and plastic strain effects are significant, and the clad structural behavior cannot be analyzed by conventional linear techniques. Instead, the detailed elastic-plastic-creep behavior must be followed along the time-dependent load history. This paper presents details of the structural evaluations of the conceptual TREAT Upgrade fuel assembly clads.

  20. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  1. Common Industrial Lighting Upgrade Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Common Industrial Lighting Upgrade Technologies Common Industrial Lighting Upgrade Technologies This tip sheet provides information on two lighting types and upgrade options, fluorescent lighting and high-bay lighting, for the purpose of improving plant-wide lighting performance. Common Industrial Lighting Upgrade Technologies (January 2010) (1002.53 KB) More Documents & Publications Energy Savings Potential of Solid-State Lighting in General Illumination Applications - Report Energy Savings

  2. Energy Upgrade California Drives Demand From Behind the Wheel | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Upgrade California Drives Demand From Behind the Wheel Energy Upgrade California Drives Demand From Behind the Wheel Photo of a trailer with the Energy Upgrade California logo and graphics painted on the side. With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE) recently completed a statewide tour of its ongoing Energy Upgrade California Roadshow. The mobile exhibit made 11 stops in nine cities across California during November

  3. LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of making buildings in a National Historical Park area more energy efficient, the City of Lowell, Massachusetts, used $5 million in seed funding from the U.S. Department of Energy's Better Buildings Neighborhood Program to launch the BetterBuildings Lowell Energy Upgrade (BLEU) project. From the beginning, the project

  4. Energy Efficiency Upgrades: Benefiting Homeowners and the Environment

    Broader source: Energy.gov [DOE]

    Learn how energy efficiency upgrades are helping a homeowner improve her home's comfort and reduce her impact on the environment.

  5. EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES In Santa Barbara County, California, the weather is so temperate that even the least energy-efficient homes can still feel comfortable year-round. To help residents see that energy upgrades can have benefits even in their climate, Santa Barbara County formed the Elective Municipal Programs to Optimize Water, Energy and Renewables (emPower) program.

  6. Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Oil Upgrading Conversion Technologies for Advanced Biofuels - Bio-Oil Upgrading PNNL report-out at the CTAB webinar on Bio-Oil Upgrading. ctab_webinar_bio_oils_upgrading.pdf (361.56 KB) More Documents & Publications Conversion Technologies for Advanced Biofuels - Bio-Oil Production Thermochemical Conversion Proceeses to Aviation Fuels 2013 Peer Review Presentations-Bio-oil

  7. Quality Control, Standardization of Upgrades, and Workforce Expectations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014.

  8. CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE The Chicago Metropolitan Agency for Planning (CMAP) and its partners created Energy Impact Illinois (EI2) to promote home energy upgrades in single-family homes, multifamily housing units, and commercial buildings to help the region meet its 2008 Chicago Climate Action Plan and longer term GO TO 2040 Strategic Plan. EI2 enlisted the help of the Elevate Energy, a

  9. Capitalizing on Multibenefits of Energy Upgrades at Multifamily Housing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (301) | Department of Energy Capitalizing on Multibenefits of Energy Upgrades at Multifamily Housing (301) Capitalizing on Multibenefits of Energy Upgrades at Multifamily Housing (301) Buildings Residential Network Peer Exchange Call Series: Capitalizing on Multibenefits of Energy Upgrades at Multifamily Housing (301), call slides and discussion summary. Call Slides and Discussion Summary (3.36 MB) More Documents & Publications Staged Upgrades as a Strategy for Residential Energy

  10. Design/Installation and Structural Integrity Assessment of Bethel Valley Low-Level Waste Collection and transfer system upgrade for Building 2649 (Transported Waste Receiving Facility) at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    1995-01-01

    This document covers the design aspects of the new tank system and certifies that the design has sufficient structural integrity and is acceptable for storing or treating hazardous and/or radioactive substances. This issue identifies specific activities that must be completed during fabrication, installation, and testing of the new tank system in order to prove compliance of the final installation with governing requirements. The assessment is responsive to the Environmental Restoration Agreement for the Oak Ridge Reservation.

  11. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  12. Catalytic Upgrading Sugars To Hydrocarbons | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sugars To Hydrocarbons Catalytic Upgrading Sugars To Hydrocarbons PDF on catalytic bioenergy process Catalytic Upgrading Sugars To Hydrocarbons (477.56 KB) More Documents & Publications Biological Conversion of Sugars To Hydrocarbons Technology Pathway Selection Effort Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway

  13. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RAPIDD Proposals Print The combined process for Rapid Access Proposals, Industry, and Director's Discretion (RAPIDD) beam time accommodates users who require limited or rapid access to ALS beam time. There are a number of proposal types that are available on a variety of beamlines, as described below. Log in to ALSHub to submit a RAPIDD proposal. The RAPIDD process is not suitable for users requiring significant beam time for an extended program of research or those wanting to perform complex

  14. Environmental Assessment for the Proposed Construction and Operations of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, New Mexico

    SciTech Connect (OSTI)

    N /A

    2002-02-26

    The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA) follows the Council on Environmental Quality regulations (40 ''Code of Federal Regulations'' [CFR] 1500-1508) and DOE's own NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision-makers with sufficient evidence and analysis to determine whether to prepare an Environmental impact statement (EIS) or issue a Finding of No Significant Impact. This EA has been prepared to assess environmental consequences resulting from the construction and operation of a Biosafety Level 3 (BSL-3) laboratory facility within the boundaries of the Los Alamos National Laboratory (LANL). LANL is one of the national security laboratories under the authority of the Under Secretary for Nuclear Security of the NNSA who serves as the Administrator for Nuclear Security and Head of the NNSA (50 USC Chapter 41, Section 2402(b)). The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for NNSA action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action and other reasonable alternatives; and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process

  15. Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico

    SciTech Connect (OSTI)

    N /A

    2003-11-03

    The National Environmental Policy Act of 1969 (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA), follows the Council on Environmental Quality regulations (40 CFR 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an environmental impact statement (EIS) or issue a Finding of No Significant Impact. Los Alamos National Laboratory (LANL) is a national security laboratory located at Los Alamos, New Mexico, that comprises about 40 square miles (mi{sup 2}) (103.6 square kilometers [km{sup 2}]) of buildings, structures, and forested land (Figure 1). It is administered by NNSA for the Federal government and is managed and operated under contract by the University of California (UC). The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation Division (DX) to create a central core area of facilities, including offices, laboratories, and other support structures, at LANL's Two-Mile Mesa Complex, which comprises portions of Technical Area (TA) 6, TA-22, and TA-40. This Proposed Action would involve constructing new buildings; consolidating existing operations and offices; enhancing utilities, roads, and security infrastructure; and demolishing or removing older buildings, structures, and transportables at various technical areas used by DX (Figure 2). This EA has been prepared to assess the potential environmental consequences of this proposed construction, operational consolidation, and demolition project. The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and

  16. Uncertainty and sensitivity analysis in the 2008 performance assessment for the proposed repository for high-level radioactive waste at Yucca Mountain, Nevada.

    SciTech Connect (OSTI)

    Helton, Jon Craig; Sallaberry, Cedric M.; Hansen, Clifford W.

    2010-05-01

    Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. As part of this development, an extensive performance assessment (PA) for the YM repository was completed in 2008 [1] and supported a license application by the DOE to the U.S. Nuclear Regulatory Commission (NRC) for the construction of the YM repository [2]. This presentation provides an overview of the conceptual and computational structure of the indicated PA (hereafter referred to as the 2008 YM PA) and the roles that uncertainty analysis and sensitivity analysis play in this structure.

  17. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  18. Design/installation and structural integrity assessment of Bethel Valley low-level waste collection and transfer system upgrade for Building 3092 (Central Off-Gas Scrubber Facility) at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    1995-01-01

    This document describes and assesses planned modifications to be made to the Building 3092 Central Off-Gas Scrubber Facility of the Oak Ridge National Laboratory, Oak Ridge, Tennessee. The modifications are made in responsible to the requirements of 40CFR264 Subpart J, relating to environmental protection requirements for buried tank systems. The modifications include the provision of a new scrubber recirculation tank in a new, below ground, lines concrete vault, replacing and existing recirculation sump that does not provide double containment. A new buried, double contained pipeline is provided to permit discharge of spent scrubber recirculation fluid to the Central Waste Collection Header. The new vault, tank, and discharge line are provided with leak detection and provisions to remove accumulated liquid. New scrubber recirculation pumps, piping, and accessories are also provided. This assessment concludes that the planned modifications comply with applicable requirements of 40CFR264 Subpart J, as set forth in Appendix F to the Federal Facility Agreement, Docket No. 89-04-FF, covering the Oak Ridge Reservation.

  19. Final base case community analysis: Indian Springs, Nevada for the Clark County socioeconomic impact assessment of the proposed high- level nuclear waste repository at Yucca Mountain, Nevada

    SciTech Connect (OSTI)

    1992-06-18

    This document provides a base case description of the rural Clark County community of Indian Springs in anticipation of change associated with the proposed high-level nuclear waste repository at Yucca Mountain. As the community closest to the proposed site, Indian Springs may be seen by site characterization workers, as well as workers associated with later repository phases, as a logical place to live. This report develops and updates information relating to a broad spectrum of socioeconomic variables, thereby providing a `snapshot` or `base case` look at Indian Springs in early 1992. With this as a background, future repository-related developments may be analytically separated from changes brought about by other factors, thus allowing for the assessment of the magnitude of local changes associated with the proposed repository. Given the size of the community, changes that may be considered small in an absolute sense may have relatively large impacts at the local level. Indian Springs is, in many respects, a unique community and a community of contrasts. An unincorporated town, it is a small yet important enclave of workers on large federal projects and home to employees of small- scale businesses and services. It is a rural community, but it is also close to the urbanized Las Vega Valley. It is a desert community, but has good water resources. It is on flat terrain, but it is located within 20 miles of the tallest mountains in Nevada. It is a town in which various interest groups diverge on issues of local importance, but in a sense of community remains an important feature of life. Finally, it has a sociodemographic history of both surface transience and underlying stability. If local land becomes available, Indian Springs has some room for growth but must first consider the historical effects of growth on the town and its desired direction for the future.

  20. A poloidal section neutron camera for MAST upgrade

    SciTech Connect (OSTI)

    Sangaroon, S.; Weiszflog, M.; Cecconello, M.; Conroy, S.; Ericsson, G.; Wodniak, I.; Keeling, D.; Turnyanskiy, M. [EURATOM Collaboration: MAST Team

    2014-08-21

    The Mega Ampere Spherical Tokamak Upgrade (MAST Upgrade) is intended as a demonstration of the physics viability of the Spherical Tokamak (ST) concept and as a platform for contributing to ITER/DEMO physics. Concerning physics exploitation, MAST Upgrade plasma scenarios can contribute to the ITER Tokamak physics particularly in the field of fast particle behavior and current drive studies. At present, MAST is equipped with a prototype neutron camera (NC). On the basis of the experience and results from previous experimental campaigns using the NC, the conceptual design of a neutron camera upgrade (NC Upgrade) is being developed. As part of the MAST Upgrade, the NC Upgrade is considered a high priority diagnostic since it would allow studies in the field of fast ions and current drive with good temporal and spatial resolution. In this paper, we explore an optional design with the camera array viewing the poloidal section of the plasma from different directions.

  1. An Upgrade for the Advanced Light Source

    SciTech Connect (OSTI)

    Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz, Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2004-09-01

    One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades.

  2. Chapter 1: ASDEX Upgrade - Introduction and Overview

    SciTech Connect (OSTI)

    Herrmann, Albrecht; Gruber, Otto

    2003-11-15

    This special issue of Fusion Science and Technology is a comprehensive review of the main physical and technological results achieved with the Axial Symmetric Divertor EXperiment (ASDEX) Upgrade located at the Max-Planck-Institut fuer Plasmaphysik in Garching, Germany. It includes special chapters presenting details of machine operation and control as well as results from the main topics of scientific investigations. This introductory chapter gives a survey of the aims of ASDEX Upgrade and the evolution of the scientific goals, which were accompanied by technical modifications during the more than 10 yr of operation. It presents a short overview on hardware modifications and on the scientific program. This chapter is also a summary of major scientific results, which are then described in more detail in the following chapters.

  3. Process for upgrading a heavy viscous hydrocarbon

    SciTech Connect (OSTI)

    Lutz, I.H.

    1984-06-12

    A process for upgrading a heavy viscous hydrocarbon, for example, rendering a heavy viscous crude pipelinable, includes visbreaking, distillation and solvent extraction steps. A heavy viscous hydrocarbon is fed through the visbreaker which forms a feed to the distillation step. A heavier fraction from distillation is fed to a solvent extraction unit which produces a fraction which contains resin. At least a portion of the resin containing fraction separated in the solvent extraction unit is recycled and combined with the feed which is to be subjected to visbreaking so that the total yield of products, residual and gas-free, is increased. The recycled resin reduces the tendency of the asphaltenes to separate from the oil and thereby reduces the tendency to lay down coke in the visbreaker; this allows higher conversion to upgraded liquid products.

  4. CORRECTION SYSTEMS UPGRADE FOR THE SNS RING.

    SciTech Connect (OSTI)

    PAPAPHILIPPOU,Y.; GARDNER,C.J.; LEE,Y.Y.; WEI,J.

    2001-06-18

    In view of the changes in the design of the SNS ring from the original FODO lattice [l] to the 220m hybrid lattice [2] and finally 1.3GeV compatible 248m ring [3], complementary studies have been undertaken, in order to upgrade its correction packages. We review the evolution of the correction systems and present the accelerator physics studies for the adopted schemes and powering plan.

  5. 12 GeV Upgrade | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using Jefferson Lab's Continuous Electron Beam Accelerator Facility. CEBAF provides physicists with an unprecedented

  6. Instrumentation upgrades for the Macromolecular Crystallography beamlines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Swiss Light Source | Stanford Synchrotron Radiation Lightsource Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April

  7. EA-1321: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York This EA evaluates the environmental impacts for ...

  8. Unsolicited Proposals

    Broader source: Energy.gov [DOE]

    The Department of Energy's (DOE’s) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.   

  9. Proposed Rules

    Energy Savers [EERE]

    EIS, Draft Corridors - September 2007. | Department of Energy Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the

  10. Proposal Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Process Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds 100G SDN Testbed Testbed Description Proposal Process Terms and Conditions Dark Fiber Testbed Test Circuit Service Testbed Results Current Testbed Research Previous Testbed Research Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600

  11. Proposed Rules

    National Nuclear Security Administration (NNSA)

    4414 Federal Register / Vol. 78, No. 209 / Tuesday, October 29, 2013 / Proposed Rules NRC about the availability of information for the proposed Waste Confidence rule and DGEIS. You may access publicly available information related to these documents by any of the following methods: * Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0246. * NRC's Waste Confidence Web site: Go to http://www.nrc.gov/waste/spent- fuel-storage/wcd.html. * NRC's

  12. Preliminary Assessment of the Impact on Reactor Vessel dpa Rates Due to Installation of a Proposed Low Enriched Uranium (LEU) Core in the High Flux Isotope Reactor (HFIR)

    SciTech Connect (OSTI)

    Daily, Charles R.

    2015-10-01

    An assessment of the impact on the High Flux Isotope Reactor (HFIR) reactor vessel (RV) displacements-per-atom (dpa) rates due to operations with the proposed low enriched uranium (LEU) core described by Ilas and Primm has been performed and is presented herein. The analyses documented herein support the conclusion that conversion of HFIR to low-enriched uranium (LEU) core operations using the LEU core design of Ilas and Primm will have no negative impact on HFIR RV dpa rates. Since its inception, HFIR has been operated with highly enriched uranium (HEU) cores. As part of an effort sponsored by the National Nuclear Security Administration (NNSA), conversion to LEU cores is being considered for future HFIR operations. The HFIR LEU configurations analyzed are consistent with the LEU core models used by Ilas and Primm and the HEU balance-of-plant models used by Risner and Blakeman in the latest analyses performed to support the HFIR materials surveillance program. The Risner and Blakeman analyses, as well as the studies documented herein, are the first to apply the hybrid transport methods available in the Automated Variance reduction Generator (ADVANTG) code to HFIR RV dpa rate calculations. These calculations have been performed on the Oak Ridge National Laboratory (ORNL) Institutional Cluster (OIC) with version 1.60 of the Monte Carlo N-Particle 5 (MCNP5) computer code.

  13. Heavy oil upgrading. Semi annual report {number_sign}2, April 1--September 30, 1996

    SciTech Connect (OSTI)

    1996-12-31

    For the period April 1 to September 30, 1996, research efforts were focused on the synthesis and characterization of large quantities of Metal Substituted Aluminophosphate Molecular Sieves Catalysts of type 36 structure (MeAPO-36) for use in the upgrading of petroleum residuum. So far the authors have succeeded in synthesizing catalysts samples containing magnesium, zinc, cobalt and manganese in the frameworks of the respective molecular sieve. Preliminary characterization studies done by Infrared Spectroscopy demonstrated that these materials contains the Bronsted acid sites that they proposed will be active centers in the Mild Hydrocracking Process. Recently, a range of interesting aluminosilicates mesoporous materials was synthesized by Mobil R and D. These materials, known as MCM-41 type materials, contain ultra large pore unidimensional channels ranging from 20 angstrom to 100 angstrom and therefore have tremendous potential for Resid upgrading since their acid strengths are milder than zeolite. To broaden the scope of the project, MCM 41 was synthesized in the laboratory according to published procedures and the structure was confirmed by XRD. In addition, an ultra large pore high silica zeolite, UTD-1, containing a 14 angstrom tetrahedral atom pore opening was recently synthesized by Researchers at Texas A and M University. Like MCM-41, this material also has tremendous potential for Resid Upgrading since the pores are capable of accommodating larger organic molecules. The authors are currently characterizing samples of this zeolite that they intend to use in conjunction with the MeAPOs to form composite catalysts for use in resid upgrading.

  14. Evaluation of solvent-based in situ processes for upgrading and recovery of heavy oil bitumen

    SciTech Connect (OSTI)

    Duerksen, J.H.; Eloyan, A.

    1995-12-31

    Solvent-based in situ recovery processes have been proposed as lower cost alternatives to thermal processes for recovery of heavy oil and bitumen. Advantages of solvent based processes are: reduced steam requirements, reduced water treating, and in situ upgrading of the produced oil. Lab results and process calculations show that low-pressure, low-energy solvent-based in situ processes have considerable technical and economic potential for upgrading and recovery of bitumen and heavy oil. In a lab flow test using Athabasca tar sand and propane as solvent, 50 percent of the bitumen was recovered as upgraded oil. Relative to the raw bitumen, API gravity increased by about 10{degrees}API, viscosity was reduced 30-fold, sulfur content was reduced about 50 percent, and metals content was also substantially reduced. Process uncertainties that will have a major impact on economics are: (1) oil production rate, (2) oil recovery, (3) extent of in situ upgrading, and (4) solvent losses. Additional lab development and field testing are required to reduce these process uncertainties and to predict commercial-scale economics.

  15. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore » port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  16. High efficiency, low cost scrubber upgrades

    SciTech Connect (OSTI)

    Klingspor, J.S.; Walters, M.

    1998-07-01

    ABB introduced the LS-2 technology; a limestone based wet FGD system, which is capable of producing high purity gypsum from low grade limestone, in late 1995. Drawing from 30,000 MWe of worldwide wet FGD experience, ABB has incorporated several innovations in the new system designed to reduce the overall cost of SO{sub 2} compliance. Collectively, these improvements are referred to as LS-2. The improvements include a compact high efficiency absorber, a simple dry grinding system, a closed coupled flue gas reheat system, and a tightly integrated dewatering system. The compact absorber includes features such a high velocity spray zone, significantly improved gas-liquid contact system, compact reaction tank, and a high velocity mist eliminator. The LS-2 system is being demonstrated at Ohio Edison's Niles Plant at the 130 MWe level, and this turnkey installation was designed and erected in a 20-month period. At Niles, all of the gypsum is sold to a local wallboard manufacturer. Many of the features included in the LS-2 design and demonstrated at Niles can be used to improve the efficiency and operation of existing systems including open spray towers and tray towers. The SO{sub 2} removal efficiency can be significantly improved by installing the high efficiency LS-2 style spray header design and the unique wall rings. The absorber bypass can be eliminated or reduced by including the LS-2 style high velocity mist eliminator. Also, the LS-2 style spray header design combined with wall rings allow for an increase in absorber gas velocity at a maintained or improved performance without the need for costly upgrades of the absorber recycle pumps. the first upgrade using LS-2 technology was done at CPA's Coal Creek Station (2{times}545 MWe). The experience form the scrubber upgrade at Coal Creek is discussed along with operating results.

  17. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.

    2005-11-01

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  18. Process for upgrading heavy hydrocarbonaceous oils

    SciTech Connect (OSTI)

    Fisher, I.P.; Souhrada, F.; Woods, H.J.

    1981-10-13

    An integrated upgrading process is disclosed which can be used to lower the specific gravity, viscosity and boiling range of heavy, viscous hydrocarbonaceous oil . The process consists of fractionally distilling the oil, treating its residuum with a hydrogen donor material under hydrocracking conditions, fractionally distilling the effluent from the hydrocracking zone and rehydrogenating that portion boiling from about 180/sup 0/ C to 350/sup 0/ C for recycling to the hydrocracking zone. The liquid portion of the oil not recycled can be recombined into a reconstituted crude suitable for transporting by normal crude pipelines.

  19. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

    2013-03-01

    This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

  20. WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES When Milwaukee, Madison, and Racine, Wisconsin, decided to work together, the result was three programs that benefited from shared ideas and individual community support. With $20 million in seed funding from the U.S. Department of Energy's Better Buildings Neighborhood Program, the Wisconsin Energy Conservation Corporation (WECC) created

  1. Security Upgrades Completed at Three Russian Nuclear Facilities | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Security Upgrades Completed at Three Russian Nuclear Facilities December 10, 2004 NNSA continues work to keep nuclear material out of the hands of terrorists RUSSIA -- The National Nuclear Security Administration (NNSA) commemorated ten years of work securing nuclear and radiological material in Russia and the former Soviet Union by completing security upgrades at two Russian nuclear facilities this week. Upgrades at a third facility were completed in

  2. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    National Nuclear Security Administration (NNSA)

    Budget | National Nuclear Security Administration | (NNSA) Nuclear Materials Safeguards and Security Upgrade Project Completed Under Budget April 03, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Nuclear Materials Safeguards and Security Upgrade Project (NMSSUP) was recently completed approximately $1 million under its original budget of $245 million. NMSSUP upgrades security at Los Alamos National Laboratory's (LANL) Technical Area-55, a facility that houses

  3. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Syngas Upgrading to Hydrocarbon Fuels Technology Pathway Syngas Upgrading to Hydrocarbon Fuels Technology Pathway This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates

  4. THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES Using $2.9 million in seed funding from the U.S. Department of Energy's (DOE's) Better Buildings Neighborhood Program, the Virginia Department of Mines, Minerals, and Energy (VDMME) set out to overcome marketplace barriers and catalyze home energy improvements in different regions of the state. Three regional energy alliances

  5. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  6. BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BEST OFFER EVER ACCELERATED TEXAS UPGRADES BEST OFFER EVER ACCELERATED TEXAS UPGRADES BEST OFFER EVER ACCELERATED TEXAS UPGRADES In Austin, Texas, air conditioners hum constantly from April to October, which creates a powerful opportunity to eliminate air leaks in homes and other buildings. That's also why contractors often find themselves with more than enough work during some months of the year but are quite slow in others, often resulting in layoffs. To tackle this challenge, municipal

  7. Bedford Energizes Other Communities to Upgrade | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bedford Energizes Other Communities to Upgrade Bedford Energizes Other Communities to Upgrade Bedford Energizes Other Communities to Upgrade Spurred by the creation of a Climate Action Plan to reduce the town of Bedford, New York's greenhouse gas emissions by 20% by 2020, Energize New York used combined funding of $2.52 million from the U.S. Department of Energy's Better Buildings Neighborhood Program and the New York State Energy Research and Development Authority (NYSERDA) to pilot a

  8. Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Preserves Historic Home Through Energy Upgrades Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades Photo of a two-story historic home. Artist James MacNeil Whistler's birthplace home in Lowell, Massachusetts, was built in 1823 and now houses the Lowell Art Association. The house was in need of a series of upgrades that improved energy efficiency while catering to the specific needs of a historic home and museum. Through the BetterBuildings Lowell

  9. MICHIGAN PUTS COMMERCIAL UPGRADES ON THE MENU | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MICHIGAN PUTS COMMERCIAL UPGRADES ON THE MENU MICHIGAN PUTS COMMERCIAL UPGRADES ON THE MENU MICHIGAN PUTS COMMERCIAL UPGRADES ON THE MENU Homeowners weren't the only ones affected by the economic downturn in Michigan. Because businesses were also looking for ways to reduce operating costs and save resources, the Michigan State Energy Program (SEP) worked with a nonprofit organization, Michigan Saves, to create the Michigan Saves Business Energy Financing (BEF) program. Using $5 million in seed

  10. Addressing Barriers to Upgrade Projects at Affordable Multifamily

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Properties (201) | Department of Energy Addressing Barriers to Upgrade Projects at Affordable Multifamily Properties (201) Addressing Barriers to Upgrade Projects at Affordable Multifamily Properties (201) Better Buildings Residential Network Peer Exchange Call Series: Addressing Barriers to Upgrade Projects at Affordable Multifamily Properties (201), call slides and discussion summary. Call Slides and Discussion Summary (1.83 MB) More Documents & Publications Incorporating Energy

  11. Local firms benefit from Jefferson Lab upgrade | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Local firms benefit from Jefferson Lab upgrade Local firms benefit from Jefferson Lab upgrade Michael Schwartz, Staff Writer Inside Business, February 16, 2009 Just two months into the year, the $310 million upgrade at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility is already paying off for local companies. A $14.1 million contract awarded earlier this month to S.B. Ballard made the Virginia Beach-based construction company the second local firm to reap the

  12. Home Improvement Catalyst: Sequencing Upgrades and Engaging Homeowners Over

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Time (201) | Department of Energy Sequencing Upgrades and Engaging Homeowners Over Time (201) Home Improvement Catalyst: Sequencing Upgrades and Engaging Homeowners Over Time (201) Better Buildings Residential Network Peer Exchange Call Series: Home Improvement Catalyst: Sequencing Upgrades and Engaging Homeowners Over Time (201), March 24, 2016, call slides and discussion summary. Call Slides and Discussion Summary (5.69 MB) More Documents & Publications Five and Dime: Revisiting

  13. REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES Faced with a utility system capacity challenge that would have required a new substation and additional power lines across their community, the environmentally conscious residents of Bainbridge Island, Washington, responded with a plan to show that the island's existing infrastructure could support energy demand-if residents reduced energy use.

  14. RESORT COMMUNITIES GET SMART WITH UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RESORT COMMUNITIES GET SMART WITH UPGRADES RESORT COMMUNITIES GET SMART WITH UPGRADES RESORT COMMUNITIES GET SMART WITH UPGRADES Colorado's popular ski resorts attract a diverse population of vacationers and seasonal workers. Half of the homes in these resort communities are claimed as second homes, occupied only 25% of the year, and the rest are a mix of middle-income and multifamily rental properties. When it comes to reaching this diverse array of residences with an energy efficiency program,

  15. Generating Demand for Multifamily Building Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating Demand for Multifamily Building Upgrades, call slides and discussion summary, May 14, 2015. Call Slides and Discussion Summary (1.2 MB) More Documents & Publications Strategies to Address Split Incentives in Multifamily Buildings Outreach to Multifamily Landlords and Tenants Trends in Multifamily Programs: What's Working and

  16. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local

  17. EECBG Success Story: County Partners with Siemens on Energy Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy County Partners with Siemens on Energy Upgrades EECBG Success Story: County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis McHenry County, Illinois was awarded with an Energy Efficiency and Conservation Block Grant (EECBG) to develop projects including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the county government center, and a public education energy savings

  18. Flexibility in heavy oil upgrading with unicracking/HDS technology

    SciTech Connect (OSTI)

    Hennig, H.; Baron, K.; Moorhead, E.L.; Smith, M.

    1984-03-01

    With petroleum reserves becoming heavier and the demand for bottom of the barrel products greatly reduced, refiners are increasing their capabilities to upgrade heavy oil. Many heavy oil upgrading options are available and the best strategy for each refiner is not obvious. The best approach will depend on the specific circumstances and goals of the refiner. This presentation discusses the relative merits of several heavy oil upgrading options utilizing the Unicracking/HDS process.

  19. Characteristics and upgrading technologies of Chinese heavy oil

    SciTech Connect (OSTI)

    Ghuang Yang; Jinsen Gao

    1995-12-31

    The characteristics of typical Chinese heavy oils produced in the eastern, northwestern, and northeastern parts of China are presented to show the uniqueness of heavy oils on the Chinese mainland. Henceforth, upgrading technologies of Chinese domestic heavy crudes are discussed along this line. Two main categories of upgrading technologies, decarbonization and hydrogenation, as realized or being developed in this country are presented. It is concluded that most Chinese heavy crudes are adaptable to conventional upgrading processes.

  20. DOE Campaign Proves Commercial Lighting Upgrades Drive Savings | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Campaign Proves Commercial Lighting Upgrades Drive Savings DOE Campaign Proves Commercial Lighting Upgrades Drive Savings July 11, 2016 - 12:08pm Addthis DOE Campaign Proves Commercial Lighting Upgrades Drive Savings By Monica Kanojia The Interior Lighting Campaign (Campaign) has seen tremendous success since its inception with more than 160 leading organizations signing on as participants and supporters. Launched as one of the Better Buildings Initiative's Technology Campaigns in

  1. Using Qualified Energy Conservation Bonds for Public Building Upgrades:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reducing Energy Bills in the City of Philadelphia | Department of Energy Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Summarizes how the City of Philadelphia leveraged $6.25 million in qualified energy conservation bonds to upgrade the energy efficiency of city buildings. Author: Lawrence Berkeley

  2. CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES In a region where energy efficiency is a relatively new concept, the Southeast Energy Efficiency Alliance (SEEA) joined with a consortium of 13 cities across eight states and one territory to build a framework for energy efficiency programs that could be replicated and implemented across the Southeast. Because each city took a unique approach to developing and

  3. California Member Connects Solar Adoption With Upgrades | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Connects Solar Adoption With Upgrades California Member Connects Solar Adoption With Upgrades Photo of a young man working on solar panels. Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies realize that partnering with local energy efficiency programs can help turn potential competition into an addition to their business. According to CSE,

  4. New Science on the Horizon as Upgraded Particle Accelerator Meets...

    Office of Science (SC) Website

    ... Leigh Harwood Jefferson Lab, 12 GeV CEBAF Upgrade - Associate Project Manager harwood@jlab.org Funding DOE Office of Science Nuclear Physics Program. Commonwealth of Virginia. ...

  5. Solar Test Facility Upgrades Complete, Leading to Better Sandia...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  6. Security Upgrades Completed in Russian Northern Fleet | National...

    National Nuclear Security Administration (NNSA)

    An important mission of NNSA is to reduce the threat of the proliferation of nuclear weapons by working cooperatively with Russia to upgrade the security of nuclear facilities. ...

  7. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Internal Revenue Service Qualified Energy Conservation Bonds Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of...

  8. The /scratc3 performance degradation after GridRaid upgrade

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The The /scratc3 performance degradation after GridRaid upgrade The /scratc3 performance degradation after GridRaid upgrade April 7, 2016 The Edison /scratch3 file system was upgraded to Grid Raid from MDRaid during the move to the CRT building (Dec, 2015). This upgrade was recommended by the vendors because it greatly enhances the drive rebuild time and write performance when compared to the traditional MDRaid that was deployed on Edison /scratch3 file system before the move (The /scratch1 and

  9. EFFICIENCY MAINE DIRECT INSTALLS INCREASE UPGRADE PACE | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Maine offered limited-time rebates to drive demand for residential energy upgrades. ... While the program also drove demand through radio and television advertising, many ...

  10. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment This webinar, held on Sept. 24, 2013, provides information on federal finance ...

  11. DOE Campaign Proves Commercial Lighting Upgrades Drive Savings...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Campaign Proves Commercial Lighting Upgrades Drive Savings By Monica Kanojia The Interior Lighting Campaign (Campaign) has seen tremendous success since its inception with more ...

  12. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Office of Environmental Management (EM)

    This feature, along with upgrades to the building envelope and lighting, are estimated to reduce the school district's annual energy usage by 43 percent. Learn more. Addthis ...

  13. Energy Upgrade Program Revitalizing Oregon | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    lighting, will be about 760, meaning the upgrades will pay for themselves in ... Upfront Costs to Save Energy Smart for Life received a loan from Palm Beach County's ...

  14. Shared Space vs. In-Unit Upgrades in Multifamily Buildings

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Multifamily Peer Exchange Call: Shared Space vs. In-Unit Upgrades in Multifamily Buildings, Call Slides and Summary, May 9, 2013.

  15. NSTX-U Control System Upgrades | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Control System Upgrades This system can serve as a control system for any fusion device, including ITER. Currently, the PCS calculates many complicated and disjoint algorithms...

  16. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Pathway More Documents & Publications Pathways for Algal Biofuels Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading 2013 Peer Review Presentations-Algae

  17. Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    or Catalyst Tuning * Beyond the Ethanol "Blend-wall" * Uses existing ... * The program objective is to take the ethanol upgrading technology from TRL 2 to TRL ...

  18. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  19. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...

    Energy Savers [EERE]

    in Phoenix, Arizona's 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in commercial and residential spaces. ...

  20. Capitalizing on Multibenefits of Energy Upgrades at Multifamily...

    Energy Savers [EERE]

    Call Slides and Discussion Summary (3.36 MB) More Documents & Publications Staged Upgrades as a Strategy for Residential Energy Efficiency Trends in Multifamily Programs: What's ...

  1. Staged Upgrades as a Strategy for Residential Energy Efficiency...

    Energy Savers [EERE]

    as a Strategy for Residential Energy Efficiency Staged Upgrades as a Strategy for Residential Energy Efficiency Better Buildings Residential Network Peer Exchange Call Series: ...

  2. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway (Technical...

    Office of Scientific and Technical Information (OSTI)

    This technology pathway case investigates the upgrading of woody biomass derived synthesis ... Sponsoring Org: USDOE Office of Energy Efficiency and Renewable Energy Biomass Program ...

  3. Bedford Energizes Other Communities to Upgrade | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Bedford Energizes Other Communities to Upgrade Spurred by the creation of a ... (NYSERDA) to pilot a successful energy efficiency program in Bedford that became a launching ...

  4. Office of Energy Policy and Systems Analysis Site Upgrade

    Broader source: Energy.gov [DOE]

    Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

  5. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion...

  6. Computing Sciences Staff Help East Bay High Schoolers Upgrade...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from underrepresented groups learn about careers in a variety of IT fields, the Laney College Computer Information Systems Department offered its Upgrade: Computer Science Program. ...

  7. Staged Upgrades as a Strategy for Residential Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Residential Network Peer Exchange Call Series: Staged Upgrades as a Strategy for Residential Energy Efficiency, call slides and discussion summary.

  8. Unsolicited Proposals

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-02-27

    The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their Supersedes DOE O 542.2. Certified 12-28-06.

  9. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T.

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  10. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  11. Fan System Assessment Tool Introduction

    Broader source: Energy.gov [DOE]

    This presentation provides an introduction to the Fan System Assessment Tool (FSAT). With FSAT, users can calculate the amount of energy used by their fan system; determine system efficiency; and quantify the savings potential of an upgraded system.

  12. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  13. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  14. TMX-Upgrade neutral-beam injection system

    SciTech Connect (OSTI)

    Felker, B.; Kane, R.J.; Wong, R.L.; Calderon, M.O.; Moore, T.L.

    1981-10-05

    The TMX experiment proved that axial confinement of central-cell ions is improved ninefold by the electrostatic potential of end-cell plasmas. The TMX Upgrade task is to improve this confinement further. This paper discusses the injector system aspects of the TMX Upgrade.

  15. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  16. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  17. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  18. Upgrading the TFTR Transrex Power Supplies

    SciTech Connect (OSTI)

    J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

    2009-05-29

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

  19. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E.; Bachimanchi, Ramakrishna; Hovater, J. Curt; Seidman, David J.; Wissmann, Mark J.

    2014-12-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  20. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  1. Heavy crude upgrading using remote natural gas

    SciTech Connect (OSTI)

    Grosboll, M.P.

    1991-12-03

    This paper describes a method of forming an upgraded crude. It comprises: forming hydrogen from methane gas for hydroconverting heavy crude to form a better crude and reduce its viscosity; hydrogenating under hydroconverting conditions of 650 degrees Fahrenheit ({degrees}F)-1000{degrees}F; and 500-3000 pounds per square inch gauge (psig) only a first portion of a crude oil stream less than the total crude oil stream to produce a light oil that has a lowered viscosity; admixing the light oil with the remainder of the crude oil stream not hydrogenated to produce a flowable crude; and transporting the flowable crude to a refinery including a substep of flowing the crude through a pipeline.

  2. Sludge formation during heavy oil upgrading

    SciTech Connect (OSTI)

    Storm, D.A.; Decanio, S.J.; Edwards, J.C.

    1995-12-31

    A soft coke-like substance often forms in the liquid product of visbreaking and hydrocracking processes for upgrading vacuum residue of heavy crude oil. This material usually limits the severity or conversion of the process because it accumulates in downstream equipment. Although the amount of such material produced depends on the crude oil, it has not been possible to correlate its production rate to chemical characteristics of the vacuum residue in a quantitative manner In this work we show that the amount of sludge produced per unit weight of vacuum residue feed in laboratory hydrotreating experiments can be correlated with four chemical characteristic of the vacuum residue: the degree of condensed polynuclear aromaticity, the average number of alkyl-groups substituting the polynuclear aromatics, the ratio of heptane insolubles to pentane insoluble-heptane solubles, and the H/C ratio of the latter fraction. The correlation coefficient is 0.95.

  3. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  4. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  5. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D

    2010-02-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  6. The DIII-D cryogenic system upgrade

    SciTech Connect (OSTI)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

  7. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    51: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade ...

  8. Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department...

    Energy Savers [EERE]

    Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense ...

  9. FY 2013 Reactor Upgrades FOA (DE-FOA-0000815) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    University Programs (NEUP) University Reactor Upgrades Infrastructure Support for the ... FY 2013 Reactor Upgrades FOA (DE-FOA-0000815).pdf (270.3 KB) More Documents & Publications ...

  10. Biomass Direct Liquefaction Options. TechnoEconomic and Life Cycle Assessment

    SciTech Connect (OSTI)

    Tews, Iva J.; Zhu, Yunhua; Drennan, Corinne; Elliott, Douglas C.; Snowden-Swan, Lesley J.; Onarheim, Kristin; Solantausta, Yrjo; Beckman, David

    2014-07-31

    The purpose of this work was to assess the competitiveness of two biomass to transportation fuel processing routes, which were under development in Finland, the U.S. and elsewhere. Concepts included fast pyrolysis (FP), and hydrothermal liquefaction (HTL), both followed by hydrodeoxygenation, and final product refining. This work was carried out as a collaboration between VTT (Finland), and PNNL (USA). The public funding agents for the work were Tekes in Finland and the Bioenergy Technologies Office of the U.S. Department of Energy. The effort was proposed as an update of the earlier comparative technoeconomic assessment performed by the IEA Bioenergy Direct Biomass Liquefaction Task in the 1980s. New developments in HTL and the upgrading of the HTL biocrude product triggered the interest in reinvestigating this comparison of these biomass liquefaction processes. In addition, developments in FP bio-oil upgrading had provided additional definition of this process option, which could provide an interesting comparison.

  11. Upgrading the Linac 400 MeV Switchyard

    SciTech Connect (OSTI)

    Charles M Ankenbrandt et al.

    2004-06-09

    This note describes changes in the 400 MeV beam transfer system from the Linac to improve the quality of the beam delivered to the Booster and to add the capability to direct beam to the MuCool Test Area (MTA). The new configuration has two pairs of pulsed dipole magnets on each side of the 400 MeV electrostatic Chopper. The smaller pair deflects vertically to replace the kick of the Chopper to send the beam to the Booster while the larger pair deflects horizontally to transfer the beam to the MTA. In this new scheme, the Chopper is uncharged while the beam is injected into the Booster such that the injection position does not rely on Chopper power supply regulation as it does now. A feature of the proposed upgrade is that no changes in the lattice functions are required in the lines to the Booster or to the Dump; once the four new magnets are installed, the switch between the old and new operating modes can be done from upstairs. The transfer to the MTA is already described in a previous note.

  12. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2008-08-11

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  13. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    SciTech Connect (OSTI)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  14. Jefferson Lab's upgraded Free-Electron Laser produces first ligh |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jefferson Lab upgraded Free-Electron Laser produces first ligh Jefferson Lab's upgraded Free-Electron Laser produces first light June 18, 2003 Researchers at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility have produced first light from their 10-kilowatt Free-Electron Laser (FEL). Entrance to Free-Electron Laser building The Free-Electron Laser (FEL) facility at Jefferson Lab. Researchers have produced first light from the upgraded 10-kW FEL, located on the

  15. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  16. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  17. Effect of product upgrading on Fischer-Tropsch indirect coal liquefaction economics

    SciTech Connect (OSTI)

    Choi, G.N.; Kramer, S.J.; Tam, S.S.; Fox, J.M. III

    1995-12-31

    Conceptual plant designs with cost estimates for indirect coal liquefaction technology to produce environmentally acceptable transportation liquid fuels meeting the Clear Air Act requirements were developed for the US Department of Energy (DOE). The designs incorporate the latest development in coal gasification technology and advanced Fischer-Tropsch (F-T) slurry reactor design. ASPEN process simulation models were developed to provide detailed plant material and energy balances, utility requirements, operating and capital costs. A linear programming model based on a typical PADD II refinery was developed to assess the values of the produced F-T products. The results then were used in a discounted cash flow spreadsheet model to examine the effect of key process variables on the overall F-T economics. Different models were developed to investigate the various routes of upgrading the F-T products. The effects of incorporating a close-coupled ZSM-5 reactor to upgrade the vapor stream leaving the Fischer-Tropsch reactor have been reported previously. This paper compares two different schemes of F-T was upgrading, namely fluidized bed catalytic cracking verse mild hydrocracking.

  18. Idaho Power- Easy Upgrades for Simple Retrofits Rebate Program

    Broader source: Energy.gov [DOE]

    Idaho Power offers incentives for its commercial and industrial customers in Idaho and Oregon to upgrade to more efficient equipment in their facilities. The utility provides rebates for lighting...

  19. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Broader source: Energy.gov (indexed) [DOE]

    Utilizing 67,000 of EERE's Tribal Energy Program funding, energy-efficiency upgrades were installed in five Nez Perce Reservation buildings that house a large portion of the Nez ...

  20. Project W-420 Stack Monitoring system upgrades conceptual design report

    SciTech Connect (OSTI)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  1. Innovative Technology Improves Upgrading Process for Unconventional Oil Resources

    Broader source: Energy.gov [DOE]

    An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy-funded project.

  2. Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goal * The program objective is take the ethanol upgrading technology from TRL 2 to TRL 3 ... reactions produce coke which impedes the primary reaction of ethanol to C3+ hydrocarbons. ...

  3. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Energy Savers [EERE]

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  4. Upgrade Boilers with Energy-Efficient Burners | Department of...

    Energy Savers [EERE]

    STEAM TIP SHEET 24 Upgrade Boilers with Energy-Efficient Burners (January 2012) (416.98 ... Improve Your Boiler's Combustion Efficiency Minimize Boiler Short Cycling Losses J.R. ...

  5. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  6. Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Your One Stop Shop for Energy Efficiency Upgrades Energy Savers: Your One Stop Shop for ... Energy Savers: A one-stop energy efficiency shop for multifamily building owners Energy ...

  7. Forthcoming Upgrades to the ARM MMCRs: Improved Radar Processor...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... laboratory test of the new processor, operating the current modes used on the SGP radar. ... In the upgrade the hardware is altered with the addition of an ortho- mode transducer ...

  8. What’s Working in Residential Energy Efficiency Upgrade Programs

    Broader source: Energy.gov [DOE]

    Slides presented in the "What’s Working in Residential Energy Efficiency Upgrade Programs Conference - Promising Approaches and Lessons Learned" on May 20, 2011 in Washington, D.C.

  9. EECBG Success Story: Energy Upgrades to Save Small Arizona Town...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Oro Valley Energy Upgrades to Save Small Arizona Town Big Money Workers demonstrate the nitrogen tank used to inflate tires in St. Peters, MO. | Courtesy of the City of St. ...

  10. Webinar: Introduction to Better Buildings Home Upgrade Program Accelerator

    Broader source: Energy.gov [DOE]

    DOE recently launched the new Better Buildings Home Upgrade Program Accelerator that will focus on the adoption of HPXML and other process improvements to reduce administrative costs and improve...

  11. Critical Nuclear Utilities Upgrade Project (CNUUP) (4572)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  12. Categorical Exclusion 4598: Security Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contai"ed or confined in a manner...

  13. Advanced photon source proposal for upgrading the radiation safety of x-ray labs

    SciTech Connect (OSTI)

    Friedman, N.

    1991-07-01

    There are two adjacent x-ray labs in building 360, each having two entrance doors. Lab A240 has two x-ray machines and lab A248 has one. All machines are equipped with sliding safety windows and microswitches to monitor the state of the windows - open or closed. Two modes of operation are possible. (1) Secure Mode in which all safety windows are closed as indicated by the microswitches. This satisfies the interlock system, allowing the high voltage power supply to be turned on. (2) Bypass Mode in which the interlock system is overridden by a key-controlled selector switch and high voltage can be turned on with machine hutch window(s) open. The bypass mode is potentially unsafe because it is possible for an operator to leave a running instrument unattended while the windows are open. Thus, it is possible for someone entering the lab to expose themselves to x-rays.

  14. Proposal for the 252Cf source upgrade to the ATLAS facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... isotopes of the rare earth elements from lanthanum to holmium. ... gas catcher by using only metal and ceramics in the ... More stations can be implemented later as demand warrants. ...

  15. Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy and Workforce Guidelines for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011 publication of the Residential Retrofit Workforce Guidelines, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work, their public review, and the JTAs/KSAs (job-task analyses/knowledge,

  16. Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    College Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Los Alamos National Security, LLC provides support November 1, 2013 Ribbon cutting at Northern New Mexico College As others look on, Northern New Mexico College

  17. Small Towns Achieve Big Savings with Lighting Upgrades | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Towns Achieve Big Savings with Lighting Upgrades Small Towns Achieve Big Savings with Lighting Upgrades August 28, 2014 - 4:16pm Addthis A worker installs energy efficient lights as part of the Smart Lights for Smart Cities program. | Photo courtesy of Mid-America Regional Council. A worker installs energy efficient lights as part of the Smart Lights for Smart Cities program. | Photo courtesy of Mid-America Regional Council. Crystal McDonald Project Officer, Department of Energy.

  18. Microsoft Word - NTS Security Upgrades-Article _2_.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NTS Security Upgrades in Full Swing NTS takes 21 st century technology lead From 1992 to 2004 the Nevada Test Site (NTS) sat underutilized. A moratorium had eliminated the primary mission of the NTS - underground nuclear testing. The stringent security requirements needed to safeguard operations would go a decade without upgrades or improvements. But in 2004, the National Nuclear Security Administration (NNSA) tasked the Nevada Site Office with a new nuclear materials mission. "Our security

  19. Energy Department Supports Efficiency Upgrades in Alaska's Lake and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Peninsula Borough | Department of Energy Supports Efficiency Upgrades in Alaska's Lake and Peninsula Borough Energy Department Supports Efficiency Upgrades in Alaska's Lake and Peninsula Borough March 24, 2016 - 4:48pm Addthis Insulation is a key element of weatherization because it provides resistance to heat flow which lowers a family’s heating and cooling costs. Insulation is especially important for homes in arctic climates, like this home in Alaska. The Energy Department's

  20. Scientific Opportunities and Challenges in the Upgraded National Spherical

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Torus Experiment | Princeton Plasma Physics Lab March 14, 2015, 9:30am to 11:00am Science On Saturday MBG Auditorium Scientific Opportunities and Challenges in the Upgraded National Spherical Torus Experiment Dr. Jonathan Menard, Principal Research Physicist PPPL Abstract: PDF icon Menard.pdf Science On Saturday, March 14, 2015, "Scientific Opportunities & Challenges in the Upgraded National Spherical Torus Experiment", Dr. Jonathan Menard, PPPL Contact Information Website:

  1. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production of High Energy Density Fuels" | Department of Energy "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" This webinar, part of the Biomass Program's bimonthly webinar series, featured presenters from Los Alamos National Laboratory who focused on high energy density fuels december2012_lanl_webinar.pdf

  2. Staged Upgrades as a Strategy for Residential Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Residential Network Peer Exchange Call Series: Staged Upgrades as a Strategy for Residential Energy Efficiency June 18, 2015 Call Slides and Discussion Summary Agenda  Call Logistics and Introductions  Residential Network and Peer Exchange Call Overview  Overview of DOE Staged Upgrades Initiative  Steve Dunn, U.S. Department of Energy  Participant Poll  Featured Presenters  Jennifer Parsons, United Illuminating Company, Southern Connecticut Gas, and

  3. Minto Upgrades Community Lodge with START Support | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minto Upgrades Community Lodge with START Support Minto Upgrades Community Lodge with START Support October 20, 2014 - 5:00pm Addthis With DOE support, workers weatherize the exterior of the Lakeview Lodge in Minto, Alaska. Photo from Russell Snyder, Interior Regional Housing Authority, NREL 31796 With DOE support, workers weatherize the exterior of the Lakeview Lodge in Minto, Alaska. Photo from Russell Snyder, Interior Regional Housing Authority, NREL 31796 The Lakeview Lodge is the heart of

  4. Living Comfortably: A Consumer's Guide to Home Energy Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project

  5. Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

  6. Commissioning results from the recently upgraded RHIC LLRF system

    SciTech Connect (OSTI)

    Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

    2011-03-28

    During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

  7. Cultural resources survey and assessment of the proposed Department of Energy Freeport to Texas City pipeline, Brazoria and Galveston Counties, Texas. Final report

    SciTech Connect (OSTI)

    Castille, G.J.; Whelan, J.P. Jr.

    1986-01-01

    An intensive survey and testing program of selected segments of a proposed Department of Energy pipeline were conducted by Coastal Environments, Inc., Baton Rouge, Louisiana, during December 1985 and January 1986. The proposed pipeline runs from Texas City, Galveston County to Bryan Mound, Brazoria County. The pedestrian survey was preceded by historical records survey to locate possible historic sites within the DOE righ-of-way. Four prehistoric sites within the ROW (41BO159, 160, 161, 162) and one outside the ROW (41BO163) were located. All are Rangia cuneata middens. The survey results are discussed with particular reference to the environmental settings of the sites and the effectiveness of the survey procedure. Two of the sites located within the ROW were subjected to additional testing. The results of the backhoe testing program are included in the site descriptions, and the scientific value of the sites are presented. 52 refs., 20 figs., 10 tabs.

  8. Upgrading heavy oil using slurry processes

    SciTech Connect (OSTI)

    Del Bianco, A.; Panariti, N.; Marchionna, M.

    1995-11-01

    There is a growing interest in processes capable of converting heavy feedstocks (petroleum residues and heavy oils) into lower boiling products of high quality. The operational problems of upgrading heavy feeds relate to the presence of sulfur, nitrogen, metals, and considerable amounts of Conradson carbon residue. An efficient residue conversion process must be able to reduce the molecular weight of the feedstocks to material with boiling points below 550 C, increase the H-to-C ratio of the refined product, and remove heteroatoms and metals. Whereas the molecular weight reduction is normally achieved by C-C bond cracking above 400 C, often in the presence of acid catalysts, a higher H-to-C ratio can be obtained by either the rejection of carbon (as in coking) or the addition of hydrogen (as in hydrogenation processes). Slurry processes combine the flexibility of the carbon rejection with the high performance of the hydrogen addition processes. The origin of slurry processes is the Bergius-Pier technology (1920--1930) for the conversion of heavy oils and coal into distillates. Whereas the original Bergius-Pier technology did not use a catalyst, small amounts of inexpensive additives or finely dispersed hydrogenation catalysts can be used to increase the rates of the desired reactions. Catalysts can also inhibit coke formation by physically interfering with the coalescence of mesophase, which is the precursor of solid coke. Catalysts are used to reduce the severity of the process and to improve the quality of the products. Most of the research carried out in the past decade in the field of slurry processes has dealt with the identification of more effective and/or less expensive catalysts and the technological problems related to their use. Here the authors discuss both subjects, describing the path from the fundamental chemistry of dispersed catalytic systems to the development and initial commercialization of slurry processes.

  9. The Need for Essential Consumer Protections: Smart Metering Proposals and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Move to Time-Based Pricing | Department of Energy Metering Proposals and the Move to Time-Based Pricing The Need for Essential Consumer Protections: Smart Metering Proposals and the Move to Time-Based Pricing There is a widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded to handle not only load growth, but the integration of renewable resources and the potential for a significant increase in

  10. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed reactor system at Building 9212. Draft environmental assessment

    SciTech Connect (OSTI)

    1995-03-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is Iocated within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The current AHF supply and fluidized-bed reactor systems were designed and constructed more than 40 years ago. Because of their deteriorating condition, the corrosive nature of the materials processed, and the antiquated design philosophy upon which they are based, their long-term reliability cannot be assured. The current AHF supply system cannot mitigate an accidental release of AHF and vents fugitive AHF directly to the atmosphere during operations. the proposed action would reduce the risk of exposing the Y-12 Plant work force, the public, and the environment to an accidental release of AHF and would ensure the continuing ability of the Y-12 Plant to manufacture highly enriched uranium metal and process uranium from retired weapons for storage.

  11. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    SciTech Connect (OSTI)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  12. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  13. Expansion of the Idaho National Engineering Laboratory Research Center: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The US Department of Energy (DOE) proposes to expand and upgrade facilities at the Idaho National Engineering Laboratory (INEL) Research Center (IRC) by constructing a research laboratory addition on the northeast corner of existing laboratory building; upgrading the fume hood system in the existing laboratory building; and constructing a hazardous waste handling facility and a chemical storage building. The DOE also proposes to expand the capabilities of biotechnology research programs by increasing use of radiolabeled compounds to levels in excess of current facility limits for three radionuclides (carbon-14, sulfur-35, and phosphorus-32). This Environmental assessment identifies the need for the new facilities, describes the proposed projects and environmental setting, and evaluates the potential environmental effects. Impacts associated with current operation are discussed and established as a baseline. Impacts associated with the proposed action and cumulative impacts are described against this background. Alternatives to the proposed action (No action; Locating proposed facilities at a different site) are discussed and a list of applicable regulations is provided. The no action alternative is continuation of existing operations at existing levels as described in Section 4 of this EA. Proposed facilities could be constructed at a different location, but these facilities would not be useful or practical since they are needed to provide a support function for IRC operations. Further, the potential environmental impacts would not be reduced if a different site was selected.

  14. Assessment of the Proposed INTEC CPP 666 Stack Monitoring Site for Compliance with ANSI/HPS N13.1 1999

    SciTech Connect (OSTI)

    Glissmeyer, John A.; Flaherty, Julia E.

    2010-02-16

    This document reports on a series of tests to determine whether the proposed new location for air sampling probes in the CPP-666 heating, ventilation and air conditioning (HVAC) exhaust duct would meet the applicable regulatory criteria regarding the placement of an air sampling probe. Federal regulations( ) require that a sampling probe be located in the exhaust stack according to the criteria of the American National Standards Institute/Health Physical Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that is representative of the effluent stream.

  15. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC&A Program

    SciTech Connect (OSTI)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-10-07

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC&A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC&A regulations.

  16. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    SciTech Connect (OSTI)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  17. Desk study of the proposed Petroleum Resource Management and Assessment project for the Western Siberia Administration, Russia. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-05-15

    The United States Trade and Development Program (TDP) is considering the provision of funds to allow a U.S. firm or firms to be hired to conduct a feasibility study on a Petroleum Resource Management and Assessment project in Russia's West Siberian Basin. To evaluate whether or not to fund the study, TDP contracted a Desk Study to evaluate the concept of the project; cost out the scope of work for the feasibility study; estimate the potential exports of U.S. equipment and services during project implementation; and make a recommendation as to whether TDP should fund the study. The goal of the feasibility study would be to stem the rapid decline in oil and gas production which has resulted in a well-publicized hard currency crisis.

  18. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    SciTech Connect (OSTI)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a new Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.

  19. Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of the Surveillance Program of the High-Level Waste Storage Tanks at Hanford :.~I LALI i~E REJ 163 ROOM 1t 4 F77L.~ ~ -_77 .:earmn OfEeg Asitn Sertr fo niomn 4 z. r _________ rment of the Surveilance Prograrn of the High-Level Storage- Tanks at Hanford P. E WOOD Robert J. Catln, Deputy Directat - Office of Environmental Compliance and Overview Office of Environment MARCH 1980 Report to the U.S. Departrent of Energy Assistant Secretary for Environment Washkngon, DC C March 27, 1980

  20. Engineering evaluation/cost analysis-environmental assessment for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri

    SciTech Connect (OSTI)

    Picel, M.H.; Peterson, J.M. . Environmental Assessment and Information Sciences Div.); Williams, M.J. )

    1992-03-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures.

  1. Engineering evaluation/cost analysis for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri -- environment assessment

    SciTech Connect (OSTI)

    Picel, M.H.; Peterson, J.M. . Environmental Assessment and Information Sciences Div.); Williams, M.J. )

    1991-05-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures. 25 refs., 4 figs., 6 tabs.

  2. Engineering evaluation/cost analysis-environmental assessment for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri. Revision 1

    SciTech Connect (OSTI)

    Picel, M.H.; Peterson, J.M.; Williams, M.J.

    1992-03-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures.

  3. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  4. A new hydrocracking catalyst for heavy oil upgrading

    SciTech Connect (OSTI)

    Itoh, T. )

    1987-04-01

    In comparison with ordinary oil, tar sands bitumen and vacuum residue contain large quantities of impurities such as asphaltene, heavy metal compounds, sulfur, and nitrogen, which are obstacles to upgrading the refining process. Therefore, these types of materials are extremely difficult to treat with existing refining technologies. In order to upgrade oil feedstocks that are of poor quality, such as tar sands bitumen, new upgrading technologies must be established. In this paper, the author discusses first, the results of catalyst screening, second, the factors of the active catalyst, and finally, the performance of a semi-industrially produced catalyst. The catalyst has high middle-distillate yield, coke plus gum (coke precursors) suppressing ability, low hydrogen consumption and mechanical strength and high temperature stability in slurry reactors.

  5. Heavy oil upgrading using an integrated gasification process

    SciTech Connect (OSTI)

    Quintana, M.E.; Falsetti, J.S.

    1995-12-31

    The value of abundant, low-grade heavy crude oil reserves can be enhanced by appropriate upgrade processing at the production site to yield marketable refinery feedstocks or ultimate products. One of the upgrading process sequences most commonly considered involves vacuum distillation followed by a bottoms processing step such as solvent deasphalting or coking. These schemes can be further enhanced with the addition of a gasification step to convert the unsaleable, bottom-of-the-barrel residues into useful products, such as high-purity hydrogen for hydrotreating, electrical power, steam for enhanced oil recovery and distillation, etc. This paper describes the Texaco Gasification Process and the T-STARs hydrotreating process, and their application in an integrated upgrade processing scheme in which an optimal, virtually bottomless oil utilization can be achieved. Illustrative examples of this integration are provided with comparative economic information.

  6. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A.; Thomas, C.P.

    1995-10-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to upgrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  7. A compound power-law model for volcanic eruptions: Implications for risk assessment of volcanism at the proposed nuclear waste repository at Yucca Mountain, Nevada

    SciTech Connect (OSTI)

    Ho, Chih-Hsiang

    1994-10-17

    Much of the ongoing debate on the use of nuclear power plants in U.S.A. centers on the safe disposal of the radioactive waste. Congress, aware of the importance of the waste issue, passed the Nuclear Waste Policy Act of 1982, requiring the federal government to develop a geologic repository for the permanent disposal of high level radioactive wastes from civilian nuclear power plants. The Department of Energy (DOE) established the Office of Civilian Radioactive Waste Management (OCRWM) in 1983 to identify potential sites. When OCRWM had selected three potential sites to study, Congress enacted the Nuclear Waste Policy Amendments Act of 1987, which directed the DOE to characterize only one of those sites, Yucca Mountain, in southern Nevada. For a site to be acceptable, theses studies must demonstrate that the site could comply with regulations and guidelines established by the federal agencies that will be responsible for licensing, regulating, and managing the waste facility. Advocates and critics disagree on the significance and interpretation of critical geological features which bear on the safety and suitability of Yucca Mountain as a site for the construction of a high-level radioactive waste repository. Recent volcanism in the vicinity of Yucca Mountain is readily recognized as an important factor in determining future public and environmental safety because of the possibility of direct disruption of a repository site by volcanism. In particular, basaltic volcanism is regarded as direct and unequivocal evidence of deep-seated geologic instability. In this paper, statistical analysis of volcanic hazard assessment at the Yucca Mountain site is discussed, taking into account some significant geological factors raised by experts. Three types of models are considered in the data analysis. The first model assumes that both past and future volcanic activities follow a homogeneous Poisson process (HPP).

  8. National Spherical Torus Experiment Upgrade (NSTX-U) | Princeton Plasma

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Lab National Spherical Torus Experiment Upgrade (NSTX-U) NSTX-U The National Spherical Torus Experiment Upgrade (NSTX-U) is an innovative magnetic fusion device that was constructed by the Princeton Plasma Physics Laboratory (PPPL) in collaboration with the Oak Ridge National Laboratory, Columbia University, and the University of Washington at Seattle. History First plasma was obtained on NSTX on Friday, February 12, 1999 at 6:06 p.m. NSTX-U is being used to study the physics

  9. Status of the ATF Damping Ring BPM Upgrade Project

    SciTech Connect (OSTI)

    Briegel, C.; Eddy, N.; Haynes, B.; May, J.; McCormick, D.; Nelson, J.; Nicklaus, D.; Prieto, P.; Rechenmacher, R.; Smith, T.; Teranuma, N.; Urakawa, J.; Voy, D.; Wendt, M.; Woodley, M.; /SLAC

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

  10. Optical Metrology Lab Receives New Funding for Upgrades

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optical Metrology Lab Receives New Funding for Upgrades Optical Metrology Lab Receives New Funding for Upgrades Print The Optical Metrology Lab (OML) at the ALS is renowned for its precision and technical expertise in metrology of x-ray optics. It has achieved this notoriety with only two full-time staff members and extremely limited laboratory facilities. Now, with new funding from the DOE that provides $1.2M to build a new clean room laboratory with environmental controls, and the promise of

  11. Optical Metrology Lab Receives New Funding for Upgrades

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optical Metrology Lab Receives New Funding for Upgrades Print The Optical Metrology Lab (OML) at the ALS is renowned for its precision and technical expertise in metrology of x-ray optics. It has achieved this notoriety with only two full-time staff members and extremely limited laboratory facilities. Now, with new funding from the DOE that provides $1.2M to build a new clean room laboratory with environmental controls, and the promise of $1.4M to upgrade and replace outdated instrumentation,

  12. Optical Metrology Lab Receives New Funding for Upgrades

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optical Metrology Lab Receives New Funding for Upgrades Print The Optical Metrology Lab (OML) at the ALS is renowned for its precision and technical expertise in metrology of x-ray optics. It has achieved this notoriety with only two full-time staff members and extremely limited laboratory facilities. Now, with new funding from the DOE that provides $1.2M to build a new clean room laboratory with environmental controls, and the promise of $1.4M to upgrade and replace outdated instrumentation,

  13. Michigan County's Energy Upgrades Back on Track | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County's Energy Upgrades Back on Track Michigan County's Energy Upgrades Back on Track August 26, 2010 - 1:00pm Addthis Michigan's Shiawassee County, located in the 'middle of the mitten,' is using over $300,000 in Recovery Act funds to perform ene Michigan's Shiawassee County, located in the 'middle of the mitten,' is using over $300,000 in Recovery Act funds to perform ene Stephen Graff Former Writer & editor for Energy Empowers, EERE Just like energy, an energy audit is a terrible thing

  14. Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades

    Broader source: Energy.gov [DOE]

    Energize Phoenix is saving energy and money for homeowners, generating jobs, and transforming a diverse array of neighborhoods along a 10-mile stretch of the city's light rail line. Energize Phoenix's residential programs are open to homeowners of all income levels, but low-to-moderate income homeowners may realize greater benefits from energy efficiency upgrades because their homes often have older, inefficient equipment. Because upfront costs can deter low- to moderate-income residents from making upgrades, Energize Phoenix developed two programs to specifically address energy efficiency with this audience.

  15. Microsoft Word - Facility Upgrades 11-21-08

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Carlsbad Field Office Waste Isolation Pilot Plant P.O. Box 3090 Carlsbad, New Mexico 88221 Media Contact: Roger Nelson U.S. DOE Carlsbad Field Office (575) 234-7213 www.wipp.energy.gov For Immediate Release WIPP Sets Schedule for Facility Upgrades CARLSBAD, N.M., November 21, 2008 - The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO) plans to perform some of the most extensive facility upgrades to the Waste Isolation Pilot Plant (WIPP) since its initial construction. The

  16. Upgrading RESRAD-RDD and Planning for Improvised Nuclear Device

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Incidents--The RESRAD-RDD&IND | Department of Energy Upgrading RESRAD-RDD and Planning for Improvised Nuclear Device Incidents--The RESRAD-RDD&IND Upgrading RESRAD-RDD and Planning for Improvised Nuclear Device Incidents--The RESRAD-RDD&IND Charley Yu*, Argonne National Laboratory ; Carlos Corredor, U.S. Department of Energy; Jing-Jy Cheng, Argonne National Laboratory; Sunita Kamboj, Argonne National Laboratory; David LePoire, Argonne National Laboratory; Paul Flood, Argonne

  17. Environmental Assessment for Selection and Operation of the Proposed Field Research Centers for the Natural and Accelerated Bioremediation Research (NABIR) Program

    SciTech Connect (OSTI)

    N /A

    2000-04-18

    The US Department of Energy (DOE) Office of Biological and Environmental Research (OBER), within the Office of Science (SC), proposes to add a Field Research Center (FRC) component to the existing Natural and Accelerated Bioremediation Research (NABIR) Program. The NABIR Program is a ten-year fundamental research program designed to increase the understanding of fundamental biogeochemical processes that would allow the use of bioremediation approaches for cleaning up DOE's contaminated legacy waste sites. An FRC would be integrated with the existing and future laboratory and field research and would provide a means of examining the fundamental biogeochemical processes that influence bioremediation under controlled small-scale field conditions. The NABIR Program would continue to perform fundamental research that might lead to promising bioremediation technologies that could be demonstrated by other means in the future. For over 50 years, DOE and its predecessor agencies have been responsible for the research, design, and production of nuclear weapons, as well as other energy-related research and development efforts. DOE's weapons production and research activities generated hazardous, mixed, and radioactive waste products. Past disposal practices have led to the contamination of soils, sediments, and groundwater with complex and exotic mixtures of compounds. This contamination and its associated costs and risks represents a major concern to DOE and the public. The high costs, long duration, and technical challenges associated with remediating the subsurface contamination at DOE sites present a significant need for fundamental research in the biological, chemical, and physical sciences that will contribute to new and cost-effective solutions. One possible low-cost approach for remediating the subsurface contamination of DOE sites is through the use of a technology known as bioremediation. Bioremediation has been defined as the use of microorganisms to biodegrade or

  18. Interior Foundation Insulation Upgrade-Minneapolis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minneapolis Residence Minneapolis, MN PROJECT INFORMATION Private residence, basement renovation Minneapolis, MN Builder: Otogawa-Anschel Design + Build Designer: Otogawa-Anschel Design + Build Building Component: Envelope: Foundation W all Application: Single family home, retrofit (also suitable for multi-family) Project year: 2006 Climate Zone 6A (applicable to most climate zones. Termite risk must be assessed) PERFORMANCE DATA Cost of Energy-Efficiency Measure (including labor): Walls- dimple

  19. Cultural Resource Investigation for the Materials and Fuels Complex Wastewater System Upgrade at the Idaho National Laboratory

    SciTech Connect (OSTI)

    Brenda R. Pace; Julie B raun Williams; Hollie Gilbert; Dino Lowrey; Julie Brizzee

    2010-05-01

    The Materials and Fuels Complex (MFC) located in Bingham County at the Idaho National Laboratory (INL) in southeastern Idaho is considering several alternatives to upgrade wastewater systems to meet future needs at the facility. In April and May of 2010, the INL Cultural Resource Management Office conducted archival searches, archaeological field surveys, and coordination with the Shoshone-Bannock Tribes to identify cultural resources that may be adversely affected by the proposed construction and to provide recommendations to protect any resources listed or eligible for listing on the National Register of Historic Places. These investigations showed that one National Register-eligible archaeological site is located on the boundary of the area of potential effects for the wastewater upgrade. This report outlines protective measures to help ensure that this resource is not adversely affected by construction.

  20. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    SciTech Connect (OSTI)

    Crew, James F.; Johnson, Herbie N.

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  1. Role of fuel upgrading for industry and residential heating

    SciTech Connect (OSTI)

    Merriam, N.W.; Gentile, R.H.

    1995-12-01

    The Koppleman Series C Process is presently being used in pilot plant tests with Wyoming coal to upgrade the Powder River Basin coal containing 30 wt% moisture and having a heating value of 8100 Btu/lb to a product containing less than 1 wt% moisture and having a heating value of 12,200 Btu/lb. This process is described.

  2. T Plant secondary containment and leak detection upgrades

    SciTech Connect (OSTI)

    Carlson, T.A.

    1995-10-19

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

  3. Apparatus for upgrading heavy hydrocarbons employing a diluent

    SciTech Connect (OSTI)

    Calderon, J. L.; Layrisse, I.

    1985-06-04

    Apparatus for upgrading heavy hydrocarbonaceous materials for making coke suitable for metallurgical purposes comprises mixing the heavy hydrocarbonaceous materials with a diluent having a closely controlled boiling range so as to facilitate transport, dehydration and desalting of the crude oil. In addition, the diluent aids in controlling temperature and residence time of the crude thereby avoiding premature decomposition.

  4. Combined process for heavy oil, upgrading and synthetic fuel production

    SciTech Connect (OSTI)

    Polomski, R.E.

    1984-06-05

    A process for upgrading heavy oil to fuel products comprises deasphalting the heavy oil with an oxygenated solvent and simultaneously converting the oxygenated solvent and deasphalted oil over a ZSM-5 type catalyst to produce gasoline and distillate boiling range hydrocarbons.

  5. Process for upgrading heavy hydrocarbons employing a diluent

    SciTech Connect (OSTI)

    Calderon, J.L.; Layrisse, I.

    1984-06-19

    A process for upgrading heavy hydrocarbonaceous materials for making coke suitable for metallurgical purposes comprises mixing the heavy hydrocarbonaceous materials with a diluent having a closely controlled boiling range so as to facilitate transport, dehydration and desalting of the crude oil. In addition, the diluent aids in controlling temperature and residence time of the crude thereby avoiding premature decomposition.

  6. Upgrading heavy hydrocarbons with supercritical water and light olefins

    SciTech Connect (OSTI)

    Paspek, S. C. Jr.

    1984-11-20

    Heavy hydrocarbons are upgraded and cracked in a process comprising contacting the heavy hydrocarbons with olefins containing 5 or less carbon atoms and a solvent, at a temperature both sufficient for cracking and greater than or equal to the critical temperature of the solvent.

  7. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. It focuses on comprehensive energy upgrades and walks through the financing options available to K-12 schools and provides case studies of six school districts from around the country.

  8. Employee-Focused Structure Helps Produce Upgrades for Contractor

    Office of Energy Efficiency and Renewable Energy (EERE)

    Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works program, has an intriguing model to help its employees feel connected to the company's success—employees are part owners. The company's creator, Suraj Lobo, built Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work.

  9. Residual oil upgrading utilizing fixed bed hydroprocessing technology

    SciTech Connect (OSTI)

    Hohnholt, J.; Fausto, C.

    1985-01-01

    Saber Refinery embarked upon major residual oil upgrading project in an effort to convert heavy atmospheric resids into gasoline and other marketable products. Selection of resid hydroprocessing as an HOC feed preparation unit was necessary for removal of impurities which include organic metallic compounds, nitrogen and sulfur, while enhancing feedstock crackability.

  10. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  11. Solar Classroom Update: Making Clean Energy Upgrades a Back-to...

    Energy Savers [EERE]

    Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority August 21, 2013 - 2:52pm ...

  12. Building Value with Energy-Saving Upgrades in Homes and Businesses...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen...

  13. The JLAB 12 GeV Energy Upgrade of CEBAF (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, ...

  14. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Algal Lipid Upgrading Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading Algal lipid upgrading is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading (490.16 KB) More Documents & Publications Pathways for Algal Biofuels Algal Lipid Extraction and

  15. Standard Work Specifications for Single-Family Home Energy Upgrades Summary Fact Sheet

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  16. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  17. Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Time | Department of Energy Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website. Spotlight on Austin, Texas (554.64 KB) More Documents & Publications Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time Spotlight on

  18. WPN 03-6: Manufactured Home Energy Audit (MHEA) Software Upgrade Availability and Licensing Requirements

    Broader source: Energy.gov [DOE]

    To provide states instructions for obtaining the Weatherization Assistance Program's upgraded audit software package for manufactured/mobile homes.

  19. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  20. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    SciTech Connect (OSTI)

    Brenman, O.; Chernyshov, M. A.; Denning, R. S.; Kolesov, S. A.; Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I.; Trosman, G.

    2006-07-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  1. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  2. Energy upgrade as regards quench performance

    SciTech Connect (OSTI)

    MacKay, W.W.; Tepikian, S.

    2011-01-01

    Since the cross section for W production increases rapidly with energy, we consider the possibility of increasing the collision energy of polarized protons at RHIC. The limits of present hardware are examined with a particular emphasis on the quench training performance of magnets. Ignoring the limits of the DX magnets, the short-sample currents for the main arc (8 cm) dipoles could allow an increase of more than 30%, however we estimate 400 to 500 training quenches for the just 8 cm dipoles to reach this level. We propose that a 10% increase in energy might be achieved with the present hardware configuration. Raising the beam energy to 275 GeV ({radical}s = 550 GeV) should increase the W production rate by almost 50% from the 250 GeV level for the same optics with identical {beta}*'s at the collision points.

  3. Janus Upgrade using brewster angle disk amplifier technology. [Janus laser system

    SciTech Connect (OSTI)

    Hunt, J.; Boben, R.; Blocker, R.; Clark, J.; Henesian, M.; Victoria, J.; Mayo, S.; Patton, H.; Pedersen, K.; Strange, N.; Swain, J.

    1990-10-24

    The Nuclear Test and Experimental Science Program (NTES) has requested that the Laser Program design and price an upgrade to the Janus laser system (JANUS UPGRADE) capable of reliably delivering in excess of 200 joules per beamline in a range of pulse forms to three experiment areas. The facility is to have the following characteristics: three experiment areas, two high energy beams, each with 200--400 joule/1 ns at a wavelength of 1.053 or 1.064 microns, and 125--250 J/1 ns when frequency doubled, one probe beam (0.1 J rated at 30 ps) to be used for interferometry, and reliable operation. The proposed facility would occupy approximately 5600 ft{sup 2} and be located in the Bldg. 174 complex. A block diagram of the entire facility is shown in Fig. 1. The facility is further defined by the Work Breakdown Structure (also shown in Fig. 1). The main elements of the WBS are the conventional facility and modifications thereof (WBS 1), special equipment (WBS 2), the laser (WBS 3), the experiment areas (WBS 4), the controls and data acquisition system (WBS 5), and the project integration (WBS 6). The experiment area has three target chambers and uses diagnostic hardware now in Janus. 12 figs., 4 tabs.

  4. Environmental assessment for the Radioactive and Mixed Waste Management Facility: Sandia National Laboratories/New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0466) under the National Environmental Policy Act (NEPA) of 1969 for the proposed completion of construction and subsequent operation of a central Radioactive and Mixed Waste Management Facility (RMWMF), in the southeastern portion of Technical Area III at Sandia National Laboratory, Albuquerque (SNLA). The RMWMF is designed to receive, store, characterize, conduct limited bench-scale treatment of, repackage, and certify low-level waste (LLW) and mixed waste (MW) (as necessary) for shipment to an offsite disposal or treatment facility. The RMWMF was partially constructed in 1989. Due to changing regulatory requirements, planned facility upgrades would be undertaken as part of the proposed action. These upgrades would include paving of road surfaces and work areas, installation of pumping equipment and lines for surface impoundment, and design and construction of air locks and truck decontamination and water treatment systems. The proposed action also includes an adjacent corrosive and reactive metals storage area, and associated roads and paving. LLW and MW generated at SNLA would be transported from the technical areas to the RMWMF in containers approved by the Department of Transportation. The RMWMF would not handle nonradioactive hazardous waste. Based on the analysis in the EA, the proposed completion of construction and operation of the RMWMF does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, preparation of an environmental impact statement for the proposed action is not required.

  5. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are typically issued twice a year, for each run cycle of the accelerator. Deadlines will be posted. Lujan Center pRad WNR Lujan Center call for proposals is closed. Proposal Submission Read the Lujan Center call for proposals. Deadline: May 21, 2016, 5:00 p.m. (MDT) Unclassified Proposal Submission: Unclassified proposals must

  6. Measuring bio-oil upgrade intermediates and corrosive species with polarity-matched analytical approaches

    SciTech Connect (OSTI)

    Connatser, Raynella M.; Lewis, Sr., Samuel Arthur; Keiser, James R.; Choi, Jae -Soon

    2014-10-03

    Integrating biofuels with conventional petroleum products requires improvements in processing to increase blendability with existing fuels. This work demonstrates analysis techniques for more hydrophilic bio-oil liquids that give improved quantitative and qualitative description of the total acid content and organic acid profiles. To protect infrastructure from damage and reduce the cost associated with upgrading, accurate determination of acid content and representative chemical compound analysis are central imperatives to assessing both the corrosivity and the progress toward removing oxygen and acidity in processed biomass liquids. Established techniques form an ample basis for bio-liquids evaluation. However, early in the upgrading process, the unique physical phases and varied hydrophilicity of many pyrolysis liquids can render analytical methods originally designed for use in petroleum-derived oils inadequate. In this work, the water solubility of the organic acids present in bio-oils is exploited in a novel extraction and titration technique followed by analysis on the water-based capillary electrophoresis (CE) platform. The modification of ASTM D664, the standard for Total Acid Number (TAN), to include aqueous carrier solvents improves the utility of that approach for quantifying acid content in hydrophilic bio-oils. Termed AMTAN (modified Total Acid Number), this technique offers 1.2% relative standard deviation and dynamic range comparable to the conventional ASTM method. Furthermore, the results of corrosion product evaluations using several different sources of real bio-oil are discussed in the context of the unique AMTAN and CE analytical approaches developed to facilitate those measurements.

  7. EA-1948: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration prepared an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines ...

  8. EA-1948: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile ...

  9. Personnel neutron dose assessment upgrade: Volume 1, Personnel neutron dosimetry assessment: (Final report)

    SciTech Connect (OSTI)

    Hadlock, D.E.; Brackenbush, L.W.; Griffith, R.V.; Hankins, D.E.; Parkhurst, M.A.; Stroud, C.M.; Faust, L.G.; Vallario, E.J.

    1988-07-01

    This report provides guidance on the characteristics, use, and calibration criteria for personnel neutron dosimeters. The report is applicable for neutrons with energies ranging from thermal to less than 20 MeV. Background for general neutron dosimetry requirements is provided, as is relevant federal regulations and other standards. The characteristics of personnel neutron dosimeters are discussed, with particular attention paid to passive neutron dosimetry systems. Two of the systems discussed are used at DOE and DOE-contractor facilities (nuclear track emulsion and thermoluminescent-albedo) and another (the combination TLD/TED) was recently developed. Topics discussed in the field applications of these dosimeters include their theory of operation, their processing, readout, and interpretation, and their advantages and disadvantages for field use. The procedures required for occupational neutron dosimetry are discussed, including radiation monitoring and the wearing of dosimeters, their exchange periods, dose equivalent evaluations, and the documenting of neutron exposures. The coverage of dosimeter testing, maintenance, and calibration includes guidance on the selection of calibration sources, the effects of irradiation geometries, lower limits of detectability, fading, frequency of calibration, spectrometry, and quality control. 49 refs., 6 figs., 8 tabs.

  10. First lasing of the IR upgrade FEL at Jefferson lab

    SciTech Connect (OSTI)

    Christopher Behre; Stephen Benson; George Biallas; James Boyce; Christopher Curtis; David Douglas; H. Dylla; L. Dillon-townes; Richard Evans; Albert Grippo; Joseph Gubeli; David Hardy; John Heckman; Carlos Hernandez-Garcia; Tommy Hiatt; Kevin Jordan; Nikolitsa Merminga; George Neil; Joseph Preble; Harvey Rutt; Michelle D. Shinn; Timothy Siggins; Hiroyuki Toyokawa; David W. Waldman; Richard Walker; Neil Wilson; Byung Yunn; Shukui Zhang

    2004-08-01

    We report initial lasing results from the IR Upgrade FEL at Jefferson Lab[1]. The electron accelerator was operated with low average current beam at 80 MeV. The time structure of the beam was 120 pC bunches at 4.678 MHz with up to 750 {micro}sec pulses at 2Hz. Lasing was established over the entire wavelength range of the mirrors (5.5-6.6 {micro}m). The detuning curve length, turn-on time, and power were in agreement with modeling results assuming a 1 psec FWHM micropulse. The same model predicts over 10 kW of power output with 10 mA of beam and 10% output coupling, which is the ultimate design goal of the IR Upgrade FEL. The behavior of the laser while the dispersion section strength was varied was found to qualitatively match predictions. Initial CW lasing results also will be presented.

  11. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A.

    1995-07-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to ungrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  12. 2 MW upgrade of the Fermilab Main Injector

    SciTech Connect (OSTI)

    Weiren Chou

    2003-06-04

    In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

  13. An overview of the planned Jefferson Lab 12-GeV helium refrigerator upgrade

    SciTech Connect (OSTI)

    Arenius, Dana; Creel, Jonathan; Dixon, Kelly; Ganni, Venkatarao; Knudsen, Peter; Sidi-Yekhlef, Ahmed; Wright, Mathew

    2008-03-01

    In February 2006, Jefferson Laboratory in Newport News, VA, received Critical Decision 1 (CD-1) approval to proceed with the engineering and design of the long anticipated upgrade to increase the beam energy of CEBAF, the Continuous Electron Beam Accelerator Facility, from 6 GeV to 12 GeV. This will require the installation of 10 new cryomodules, and additional 2.1-K refrigeration beyond the available 4600 W to handle the increased heat loads. Additionally, a new experimental hall, Hall D, is planned that will require the installation of a small, available refrigerator. This paper will present an overview of the integration of the new proposed refrigeration system into CEBAF, the installation of the available refrigerator for Hall D, and includes planned work scope, current schedule plans and project status.

  14. Present Status of the DAFNE Upgrade And Perspectives

    SciTech Connect (OSTI)

    Milardi, C.; Alesini, D.; Biagini, M.E.; Biscari, C.; Boni, R.; Boscolo, M.; Bossi, F.; Buonomo, B.; Clozza, A.; Delle Monache, G.; Demma, T.; Di Pasquale, E.; Di Pirro, G.; Drago, A.; Gallo, A.; Ghigo, A.; Guiducci, S.; Ligi, C.; Marcellini, F.; Mazzitelli, G.; Murtas, F.; /Frascati /Novosibirsk, IYF /CERN /INFN, Cosenza /INFN, Rome /KEK, Tsukuba /Orsay, LAL /Rome U. /Pisa U. /INFN, Pisa /SLAC /Rome III U.

    2009-06-05

    The DA{Phi}NE collider has been recently upgraded in order to implement a new collision scheme based on large Piwinski angle and cancellation of the synchro-betatron resonances by means of electromagnetic sextupoles (Crab-Waist compensation). The novel approach has proved to be effective in improving beam-beam interaction and collider luminosity. The results and the measurements taken during commissioning as well as the perspectives for the SIDDHARTA run are presented and discussed.

  15. Single-shell tank ventilation upgrades needs analysis report

    SciTech Connect (OSTI)

    Kriskovich, J.R., Fluor Daniel Hanford

    1997-02-03

    This report was written to comply with the objectives of the Hanford Federal Facility Agreement and Consent Order, Tri-Party Agreement Milestone M-43-03 Provide to the Washington State Department of Ecology and Department of Health the Results of the Single-Shell Tank Ventilation Upgrades Needs Analysis. The needs analysis consists of identifying the current type and status of each single-shell tank ventilation system, identifying current and projected authorization basis requirements, and identifying ventilation system compliance deficiencies.

  16. MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized *

  17. Solar Test Facility Upgrades Complete, Leading to Better Sandia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capabilities to Support Power Industry Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power Industry - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power

  18. Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway Mary Biddy National Renewable Energy Laboratory Susanne Jones Pacific Northwest National Laboratory NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC, under contract DE-AC36-08GO28308. Pacific Northwest National Laboratory is operated by Battelle for the United States Department of Energy under contract

  19. Nuclear Materials Safeguards and Security Upgrade Project | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration Materials Safeguards and Security Upgrade Project NNSA Announces 2014 Security Professional of the Year Awards WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) today announced the recipients of the 2014 Bradley A. Peterson Federal and Contractor Security Professional of the Year Awards. Pamela Valdez from the Los Alamos Field Office will receive the federal award and Randy Fraser from

  20. Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy of Sugars to Hydrocarbons Technology Pathway Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway This technology pathway case investigates the catalytic conversion of solubilized carbohydrate streams to hydrocarbon biofuels, utilizing data from recent efforts within the National Advanced Biofuels Consortium (NABC) in collaboration with Virent, Inc. Technical barriers and key research needs that should be pursued for the catalytic conversion of sugars pathway

  1. Computational Tools to Assess Turbine Biological Performance

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Serkowski, John A.; Rakowski, Cynthia L.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2014-07-24

    Public Utility District No. 2 of Grant County (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now more than 50 years old. Plans are underway to refit these aging turbines with new runners. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when upgrading the turbines. In this paper, a method for turbine biological performance assessment (BioPA) is demonstrated. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We present an application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  2. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  3. Upgrades to the Polarized Neutron Reflectometer Asterix at LANSCE

    SciTech Connect (OSTI)

    Pynn, Roger

    2015-03-16

    We have upgraded the polarized neutron reflectometer, Asterix, at the Lujan Neutron Scattering Center at Los Alamos for the benefit of the research communities that study magnetic and complex-fluid films, both of which play important roles in support of the DOE’s energy mission. The upgrades to the instrument include: • A secondary spectrometer that was integrated with a Huber sample goniometer purchased with other funds just prior to the start of our project. The secondary spectrometer provides a flexible length for the scattered flight path, includes a mechanism to select among 3 alternative polarization analyzers as well as a support for new neutron detectors. Also included is an optic rail for reproducible positioning of components for Spin Echo Scattering Angle Measurement (SESAME). The entire secondary spectrometer is now non-magnetic, as required for neutron Larmor labeling. • A broad-band neutron polarizer for the incident neutron beam based on the V geometry. • A wide-angle neutron polarization analyzer • A 2d position-sensitive neutron detector • Electromagnetic coils (Wollaston prisms) for SESAME plus the associated power supplies, cooling, safety systems and integration into the data acquisition system. The upgrades allowed a nearly effortless transition between configurations required to serve the polarized neutron reflectometry community, users of the 11 T cryomagnet and users of SESAME.

  4. A novel process for upgrading heavy oil emulsions

    SciTech Connect (OSTI)

    Ng, F.T.T.; Rintjema, R.T.

    1994-12-31

    Canada has extensive reserves of high sulfur heavy oils. These heavy oils are recovered primarily by steam injection techniques. As a result, the heavy oils are obtained as emulsions at well-heads. The heavy oils, being high in sulfur and metals, and low in hydrogen to carbon atomic ratio, require upgrading such as desulfurization and hydrocracking before it can be used in conventional refineries. Conventional emulsion treatment and desulfurization technology require multistage processing. Thus, alternative technologies for processing heavy oil emulsions would be attractive. The authors have recently developed a novel single stage process for upgrading emulsions via activation of water to provide hydrogen in situ for catalytic desulfurization and hydrocracking. Current work is focused on the desulfurization aspect of upgrading, using benzothiophene as the model sulfur compound and molybdic acid as the catalyst. At 340 C and a CO loading pressure of 600 psi, up to 86% sulfur removal was obtained. As well, in situ generated H{sub 2} was found to be more active than externally supplied molecular H{sub 2}. A likely pathway for desulfurization of benzothiophene was via the initial hydrogenation of benzothiophene to dihydrobenzothiophene followed by hydrogenolysis to give ethylbenzene and H{sub 2}S.

  5. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  6. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or until the number of shifts recommended by the Proposal Study Panels (PSP) for the life of the proposal have been used. Users may decide whether to submit a new proposal or...

  7. WPN 05-7: Weatherization Assistant [National Energy Audit (Neat) and Manufactured Home Energy Audit (MHEA)] Software Upgrade Availability

    Broader source: Energy.gov [DOE]

    To provide states with instructions for obtaining the Weatherization Assistance Program's 2005 upgraded audit software package.

  8. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trident Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team ...

  9. The Need for Essential Consumer Protections: Smart metering proposals and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the move to time-based pricing. August 2010 | Department of Energy metering proposals and the move to time-based pricing. August 2010 The Need for Essential Consumer Protections: Smart metering proposals and the move to time-based pricing. August 2010 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid

  10. Upgrade of the PNNL TEPC and Multisphere Spectrometer

    SciTech Connect (OSTI)

    Scherpelz, Robert I.; Conrady, Matthew M.

    2008-09-10

    The Pacific Northwest National Laboratory (PNNL) has used two types of instruments, the tissue equivalent proportional counter (TEPC) and the multisphere spectrometer for characterizing neutron radiation fields in support of neutron dosimetry at the Hanford site. The US Department of Energy recently issued new requirements for radiation protection standards in 10 CFR 835 which affect the way that neutron dose equivalent rates are evaluated. In response to the new requirements, PNNL has upgraded the analyses used in conjunction with the TEPC and multisphere. The analysis software for the TEPC was modified for this effort, and a new analysis code was selected for the multisphere. These new analysis techniques were implemented and tested with measurement data that had been collected in previous measurements. In order to test the effectiveness of the changes, measurements were taken in PNNL’s Low Scatter Room using 252Cf sources in both unmoderated and D2O-moderated configurations that generate well-characterized neutron fields. The instruments were also used at Los Alamos National Laboratory (LANL), in their Neutron Free-in-Air calibration room, also using neutron sources that generate well-characterized neutron fields. The results of the software modifications and the measurements are documented in this report. The TEPC measurements performed at PNNL agreed well with accepted dose equivalent rates using the traditional analysis, agreeing with the accepted value to within 13% for both unmoderated and moderated 252Cf sources. When the new analysis was applied to the TEPC measurement data, the results were high compared to the new accepted value. A similar pattern was seen for TEPC measurements at LANL. Using the traditional analysis method, results for all neutron sources showed good agreement with accepted values, nearly always less than 10%. For the new method of analysis, however, the TEPC responded with higher dose equivalent rates than accepted, by as much as 25

  11. NETL: Unsolicited Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The "Guide for the Submission of Unsolicited Proposals" provides more information on the unsolicited proposal process. DOE encourages organizations and individuals to submit self-generated, unsolicited proposals that are relevant to DOE's research

  12. PROPOSAL PREPARATION INSTRUCTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-08RV14800 Modification No. A015 PROPOSAL PREPARATION INSTRUCTIONS 1. INTRODUCTION This document contains instructions to the contractor for the preparation of a proposal in response to the modification of the contract which defines work that will be funded by and performed under the provisions of the American Recovery and Reinvestment Act (Recovery Act). The contractor shall provide a written proposal consisting of a Technical Proposal and a Cost and Fee Proposal. The

  13. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trident Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team Leader Randy Johnson (505) 665-5089 Email Trident Governing Board Contact Ray Leeper (505) 667-3653 Email Call for Proposals 2015-2016 The Trident Laser Facility is accepting proposals for experiments to be performed at the facility during the period October 2015 through September 2016. All proposals submitted are

  14. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals dotline Lujan Center: Material Science FY17 Call for Proposals Proposal Submission: https://www.lanl.gov/orgs/lansce/ Lujan Center Call for Proposals is Open. Deadline: May 21, 2016 at 5:00 pm (MDT). lansce.lanl.gov lansce.lanl.gov/lujan The Los Alamos Neutron Science Center (LANSCE) invites proposals for material science experiments at the Lujan Center addressing science of NNSA and LANL programmatic interest for the September 2016 - February 2017 run cycle. The Lujan Center utilizes

  15. HIGH-ORDER MODELING OF AN ERL FOR ELECTRON COOLING IN THE RHIC LUMINOSITY UPGRADE USING MARYLIE/IMPACT.

    SciTech Connect (OSTI)

    RANJBAR,V.; BEN-ZVI,I.; PAUL, K.; ABELL, D.T.; TECH-X CORP.; KEWISCH, J.; RYNE, R.D.; QIANG, J.

    2007-06-25

    Plans for the RHIC luminosity upgrade call for an electron cooling system that will place substantial demands on the energy, current, brightness, and beam quality of the electron beam. In particular, the requirements demand a new level of fidelity in beam dynamics simulations. New developments in MARYLIE/IMPACT have improved both the space charge computations for beams with large aspect ratios and the beam dynamic computations for rf cavities. We present the results of beam dynamics simulations that include the effects of space charge and nonlinearities, and aim to assess the tolerance for errors and nonlinearities on current designs for a super-conducting ERL.

  16. DOE/EA-1515: Final Environmental Assessment for Proposed Closure of the Airport Landfills Within Technical Area 73 at Los Alamos National Laboratory, Los Alamos, New Mexico (May 2005)

    SciTech Connect (OSTI)

    N /A

    2005-05-01

    Chapter 1 presents the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration's (NNSA) requirements under the ''National Environmental Policy Act of 1969'' (NEPA), background information on the proposal, the purpose and need for agency action, and a summary of public involvement activities. This Environmental Assessment (EA) incorporates information (tiers) from the ''Environmental Impact Statement for the Conveyance and Transfer of Certain Land Tracts Administered by the U.S. Department of Energy and Located at Los Alamos National Laboratory'' (LANL) (DOE 1999a), the ''Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory'' (SWEIS; DOE 1999b), the ''RCRA Facility Investigation (RFI) Report for Potential Release Sites 73-001(a)-99 and 73-001(b)-99 (LANL 1998a)'', and the ''Voluntary Corrective Measure (VCM) Plan for Potential Release Sites 73-001(a)-99 and 73-001(b)-99 (LANL 2002)'', and other environmental documents listed in Chapter 7, References.

  17. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals | FY2017 pRad: Call for Proposals Proposal Submission Deadline: 5:00 pm (MST) Wednesday, March 16, 2016. PAC Review: April 6th and 7th, 2016. Call for Proposals: Proton Radiography FY17 The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for experiments for the Proton Radiography Facility (pRad) during Fiscal Year 2017. Proposals for FY18 experiments that will not be ready to be performed FY17 will be considered. The proton radiography facility uses 800 MeV

  18. Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals | FY2016 pRad: Call for Proposals Proposal Submission Deadline: 5:00 pm (MST) Wednesday, March 16, 2016. PAC Review: April 6th and 7th, 2016. Call for Proposals: Proton Radiography FY17 The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for experiments for the Proton Radiography Facility (pRad) during Fiscal Year 2017. Proposals for FY18 experiments that will not be ready to be performed FY17 will be considered. The proton radiography facility uses 800 MeV

  19. Upgrade of the Los Alamos Plutonium Facility control system

    SciTech Connect (OSTI)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-05-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed.

  20. The D0 level 3 DAQ system: operation and upgrades

    SciTech Connect (OSTI)

    Garcia-Bellido, Aran; Bose, Tulika; Brooijmans, Gustaaf; Chapin, Doug; Cutts, David; Fuess, Stuart; Gadfort, Thomas; Haas, Andrew; Lee, William; Rechenmacher, Ron; Snyder, Scott; /Washington U., Seattle /Brown U. /Columbia U. /Fermilab /Brookhaven

    2007-05-01

    The D{O} Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.

  1. PERFORMANCE OF AND UPGRADES TO THE SNS COLLIMATOR SYSTEMS

    SciTech Connect (OSTI)

    Plum, Michael A; Abdou, Ashraf A; Jacobs, Lorelei L; Janney, Jim G; Geoghegan, Patrick J; McTeer, Stephen Mark; Popova, Irina; Ferguson, Phillip D; Zhukov, Alexander P

    2009-01-01

    As the Spallation Neutron Source (SNS) beam power is increased, the collimator systems are becoming correspondingly more important. The High Energy Beam Transport (HEBT) transverse collimators are now routinely used during neutron production. We are in the process of redesigning the HEBT momentum collimation system due to problems with gas production from radiolysis. The Ring collimators are designed for two-stage operation but to date they are mainly used in one-stage mode. In this paper we will discuss the status, the operational performance, and upgrades to the collimation systems.

  2. A number of upgrades on RHIC power supply system

    SciTech Connect (OSTI)

    Mi, C.; Bruno, D.; Drozd, J.; Nolan, T.; Orsatti, F.; Heppener, G.; Di Lieto, A.; Schultheiss, C.; Samms, T.; Zapasek, R.; Sandberg, J.

    2015-05-03

    This year marks the 15th run for the Relativistic Heavy Ion Collider (RHIC). Operation of a reliable superconducting magnet power supply system is a key factor of an accelerator’s performance. Over the past 15 years, the RHIC power supply group has made many improvements to increase the machine availability and reduce failures. During these past 15 years of operating RHIC a lot of problems have been solved or addressed. In this paper some of the essential upgrades/improvements are discussed.

  3. Network Upgrade for the SLC: Control System Modifications

    SciTech Connect (OSTI)

    Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

    2011-09-09

    Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

  4. 2009 Section V: Superconducting Cyclotron, Instrumentation, and RIB Upgrade

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    09 - March 31, 2010 H. L. Clark, J. Brinkley, G. Chubarian, V. Horvat, B. Hyman, and G. Tabacaru Cyclotron computing R. Burch and K. Hagel Cyclotron Institute upgrade project H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, G. Souliotis and G. Tabacaru Testing the injection of ions in the CB-ECRIS at the Cyclotron Institute G. Tabacaru, D. P. May, and J. Saathoff Digital signal processing for improved half-life measurements L. Chen and J. C. Hardy A new TDC-based data

  5. Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Naval Air Station Oceana | Department of Energy Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana January 7, 2015 - 4:52pm Addthis Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Addthis Related Articles Building Science Corporation worked with Transformations, Inc., on a subdivision of

  6. Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defense Exchange Facilities | Department of Energy Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Case study details the U.S. Department of Defense (DOD) Exchange (formerly the Army and Air Force Exchange Service), which took a

  7. NIST Releases Test Framework for Upgrading of Smart Meters | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters July 12, 2012 - 10:46am Addthis The National Institute of Standards and Technology (NIST) has released a draft set of guidelines that will help utilities test their procedures for upgrading their smart meters securely from a remote location and determine whether their procedures conform with the National Electrical Manufacturers Association (NEMA) Standard for Smart Grid

  8. Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Time | Department of Energy Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time This Better Buildings case study from April 2011 focuses on grantee partner Austin. Spotlight on Austin, Texas (296.86 KB) More Documents & Publications Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Let Your Contractor Be Your Guide for Big

  9. Computing Sciences Staff Help East Bay High Schoolers Upgrade their Summer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Sciences Staff Help East Bay High Schoolers Upgrade their Summer Computing Sciences Staff Help East Bay High Schoolers Upgrade their Summer August 6, 2015 Jon Bashor, jbashor@lbl.gov, +1 510 486 5849 To help prepare students from underrepresented groups learn about careers in a variety of IT fields, the Laney College Computer Information Systems Department offered its Upgrade: Computer Science Program. Thirty-eight students from 10 East Bay high schools registered for the eight-week

  10. PACE Adds Market Value for Home Energy Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PACE Adds Market Value for Home Energy Upgrades PACE Adds Market Value for Home Energy Upgrades July 19, 2016 - 6:56pm Addthis PACE Adds Market Value for Home Energy Upgrades Dr. Kathleen Hogan Dr. Kathleen Hogan Deputy Assistant Secretary for Energy Efficiency What are the key facts? Newly announced partnerships and resources by the Energy Department will bring the benefits of energy efficiency and renewable energy to more states and communities. The Energy Department is releasing updated

  11. Y-12 Completes Major Upgrade of Compressed Air Systems | National Nuclear

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Administration | (NNSA) Major Upgrade of Compressed Air Systems September 26, 2007 Microsoft Office document icon NR-09-07

  12. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014) - May 15...

    Office of Environmental Management (EM)

    1) provides objectives, criteria, and approaches for establishing and maintaining the safety basis at nuclear facilities. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014)...

  13. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  14. What's Working in Residential Energy Efficiency Upgrade Programs Workshop, May 2011

    Broader source: Energy.gov [DOE]

    On May 20, 2011, the Better Buildings Neighborhood Program held the What's Working in Residential Energy Efficiency Upgrade Programs workshop. Better Buildings hosted the workshop in collaboration...

  15. PPPL to launch major upgrade of key fusion energy test facility...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to launch major upgrade of key fusion energy test facility NSTX project will produce most ... of nuclear fusion as a clean, safe and abundant fuel for generating electricity. ...

  16. Energy Upgrade California in Los Angeles County-- The Flex Path Program

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County: The Flex Path Program. Provides an overview of the Flex Path Pilot Program, progress and next steps.

  17. Upgrading of heavy oil from the San Joaquin Valley of California by aqueous pyrolysis

    SciTech Connect (OSTI)

    Reynolds, J.G.; Murray, A.M.; Nuxoll, E.V.; Fox, G.A.

    1995-10-01

    Midway Sunset crude oil and well-head oil were treated at elevated temperatures in a closed system with the presence of water. Mild to moderate upgrading, as measured by increase in API gravity, was observed at 400{degrees}C or above. Reduced pressure operation exhibited upgrading activity comparable to upgrading under normal aqueous pyrolysis conditions. Reduced pressure operation was obtained by the use of specific blending methods, a surfactant, and the proper amount of water. The use of additives provided additional upgrading. The best of the minimum set tested was Co(II) 2-ethylhexanoate. Fe(III) 2-ethylhexanoate also showed some activity under certain conditions.

  18. Upgrading of heavy oil from the San Joaquin valley of California by aqueous pyrolysis

    SciTech Connect (OSTI)

    Reynolds, J.G.; Murray, A.M.; Nuxoll, E.V.; Fox, G.A.; Thorsness, C.B.; Khan, M.R.

    1997-08-01

    Midway Sunset crude oil and well-head oil were treated at elevated temperatures in a closed system with the presence of water. Mild to moderate upgrading, as measured by increasing in API gravity, was observed at 400 C or above. Reduced pressure operation exhibited upgrading activity comparable to upgrading under normal aqueous pyrolysis conditions. Reduced pressure operation was obtained by the use of specific blending methods, a surfactant, and the proper amount of water. The use of metal complexes provided additional upgrading. The best of the minimum set tested was Co(II) 2-ethylhexanoate. Fe, Zn, Mo, Cu, and Ni complexes also showed some levels of activity.

  19. Upgrade Boilers with Energy-Efficient Burners - Steam Tip Sheet #24

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  20. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Broader source: Energy.gov [DOE]

    This webinar, held on Sept. 24, 2013, provides information on federal finance facilities available for energy efficiency upgrades and clean energy deployment.

  1. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

  2. Design/installation and structural integrity assessment under the Federal Facility Agreement for Bethel Valley low-level waste collection and transfer system upgrade for Building 2026 (High Radiation Level Analytical Laboratory) and Building 2099 (Monitoring and Control Station) at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This document presents a Design/Installation and Structural Integrity Assessment for a replacement tank system for portions of the Bethel Valley Low-Level Waste (LLW) System, located at the Oak Ridge Reservation, Oak Ridge, Tennessee. This issue of the assessment covers the design aspects of the replacement tank system, and certifies that the design has sufficient structural integrity and is acceptable for the storing or treating of hazardous and/or radioactive substances. This document will be reissued at a future date and will then include the assessment of the installation of the replacement tank system. The present issue identifies specific activities that must be completed during the fabrication, installation, and testing of the replacement tank system in order to provide assurance that the final installation complies with governing requirements.

  3. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General User Proposals (GUPs) General User Proposals (GUPs) Print Tuesday, 01 June 2010 09:36 General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in

  4. Call for Proposal Submissions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    call for proposal submissions Call for Proposal Submissions The Jupiter Laser Facility (JLF) announces that the Request for Proposals for the JLF User Program for experiments in Calendar Year 2017, January through December, is open. Jupiter is a multi-platform, intermediate-scale laser user facility located at Lawrence Livermore National Laboratory. Proposals will be accepted for the laser platforms Titan, Janus, and COMET. Information and submission instructions are available at

  5. Submit CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submit Proposals Submit CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email FY16 Call for Proposals period is now closed. The Center for Space and Earth Science (CSES) at Los Alamos National Laboratory (LANL) annually solicits proposals in the disciplines of geoscience, climate,

  6. Measuring bio-oil upgrade intermediates and corrosive species with polarity-matched analytical approaches

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Connatser, Raynella M.; Lewis, Sr., Samuel Arthur; Keiser, James R.; Choi, Jae -Soon

    2014-10-03

    Integrating biofuels with conventional petroleum products requires improvements in processing to increase blendability with existing fuels. This work demonstrates analysis techniques for more hydrophilic bio-oil liquids that give improved quantitative and qualitative description of the total acid content and organic acid profiles. To protect infrastructure from damage and reduce the cost associated with upgrading, accurate determination of acid content and representative chemical compound analysis are central imperatives to assessing both the corrosivity and the progress toward removing oxygen and acidity in processed biomass liquids. Established techniques form an ample basis for bio-liquids evaluation. However, early in the upgrading process, themore » unique physical phases and varied hydrophilicity of many pyrolysis liquids can render analytical methods originally designed for use in petroleum-derived oils inadequate. In this work, the water solubility of the organic acids present in bio-oils is exploited in a novel extraction and titration technique followed by analysis on the water-based capillary electrophoresis (CE) platform. The modification of ASTM D664, the standard for Total Acid Number (TAN), to include aqueous carrier solvents improves the utility of that approach for quantifying acid content in hydrophilic bio-oils. Termed AMTAN (modified Total Acid Number), this technique offers 1.2% relative standard deviation and dynamic range comparable to the conventional ASTM method. Furthermore, the results of corrosion product evaluations using several different sources of real bio-oil are discussed in the context of the unique AMTAN and CE analytical approaches developed to facilitate those measurements.« less

  7. SOVENT BASED ENHANCED OIL RECOVERY FOR IN-SITU UPGRADING OF HEAVY OIL SANDS

    SciTech Connect (OSTI)

    Munroe, Norman

    2009-01-30

    With the depletion of conventional crude oil reserves in the world, heavy oil and bitumen resources have great potential to meet the future demand for petroleum products. However, oil recovery from heavy oil and bitumen reservoirs is much more difficult than that from conventional oil reservoirs. This is mainly because heavy oil or bitumen is partially or completely immobile under reservoir conditions due to its extremely high viscosity, which creates special production challenges. In order to overcome these challenges significant efforts were devoted by Applied Research Center (ARC) at Florida International University and The Center for Energy Economics (CEE) at the University of Texas. A simplified model was developed to assess the density of the upgraded crude depending on the ratio of solvent mass to crude oil mass, temperature, pressure and the properties of the crude oil. The simplified model incorporated the interaction dynamics into a homogeneous, porous heavy oil reservoir to simulate the dispersion and concentration of injected CO2. The model also incorporated the characteristic of a highly varying CO2 density near the critical point. Since the major challenge in heavy oil recovery is its high viscosity, most researchers have focused their investigations on this parameter in the laboratory as well as in the field resulting in disparaging results. This was attributed to oil being a complex poly-disperse blend of light and heavy paraffins, aromatics, resins and asphaltenes, which have diverse behaviors at reservoir temperature and pressures. The situation is exacerbated by a dearth of experimental data on gas diffusion coefficients in heavy oils due to the tedious nature of diffusivity measurements. Ultimately, the viscosity and thus oil recovery is regulated by pressure and its effect on the diffusion coefficient and oil swelling factors. The generation of a new phase within the crude and the differences in mobility between the new crude matrix and the

  8. Evaluation of heavy oil upgrading/refining process designs for HRI Dynacracking and UOP Aurabon Process. Final report

    SciTech Connect (OSTI)

    Davis, H.; Adams, D.G.; Fox, J.V.

    1984-04-01

    The process designs examined consist of two non-commercialized heavy oil upgrading processes; namely, the Hydrocarbon Research, Inc. (HRI) Dynacracking Process and the UOP Process Division (UOP) Aurabon Process. The latter process design includes, besides the Aurabon Process, an integrated hydrotreating section which does have commercial stature. The Dynacracking Process designs cover six cases involving three heavy crude feedstocks. The Aurabon Complex designs are based on four cases, two for each of two heavy crude feedstocks. The engineering support services involved engineering review and assessment of data, drawings, reports and other information generated by the two process designers. Background information, the review and assessment methodology employed for evaluating the process designs, and a detailed discussion of the process design data generated by both process contractors are presented in this report. Significant findings for both processes may be summarized as follows: (1) The process designs were executed using sound engineering principles and practices; (2) Both processes may be deemed to perform in accordance with their process design; (3) a wide variety of heavy oil charge stocks can be upgraded by either process to products generally suitable for further refinery processing; (4) no insurmountable operating or environmental problems are anticipated; (5) the estimated capital investments and operating utility requirements are indicative of the increased cost to process contaminated heavy crudes; (6) the cost differential between the higher quantity lighter crudes and the poorer quality heavy crudes must be sufficient to justify these higher expenditures; and (7) both processes merit consideration by refiners contemplating contaminated heavy oil upgrading. 53 references, 40 tables.

  9. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect (OSTI)

    Andrew Kimber,Richard Nelson

    2011-03-01

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  10. Post Retort, Pre Hydro-treat Upgrading of Shale Oil

    SciTech Connect (OSTI)

    Gordon, John

    2012-09-30

    Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

  11. Analysis of NSTX Upgrade OH Magnet and Center Stack

    SciTech Connect (OSTI)

    A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

    2010-11-30

    The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

  12. THERMAL UPGRADING OF 9977 RADIOACTIVE MATERIAL (RAM) TYPE B PACKAGE

    SciTech Connect (OSTI)

    Gupta, N.; Abramczyk, G.

    2012-03-26

    The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

  13. Novel Fast Pyrolysis/Catalytic Technology for the Production of Stable Upgraded Liquids

    SciTech Connect (OSTI)

    Oyama, Ted; Agblevor, Foster; Battaglia, Francine; Klein, Michael

    2013-01-18

    The objective of the proposed research is the demonstration and development of a novel biomass pyrolysis technology for the production of a stable bio-oil. The approach is to carry out catalytic hydrodeoxygenation (HDO) and upgrading together with pyrolysis in a single fluidized bed reactor with a unique two-level design that permits the physical separation of the two processes. The hydrogen required for the HDO will be generated in the catalytic section by the water-gas shift reaction employing recycled CO produced from the pyrolysis reaction itself. Thus, the use of a reactive recycle stream is another innovation in this technology. The catalysts will be designed in collaboration with BASF Catalysts LLC (formerly Engelhard Corporation), a leader in the manufacture of attrition-resistant cracking catalysts. The proposed work will include reactor modeling with state-of-the-art computational fluid dynamics in a supercomputer, and advanced kinetic analysis for optimization of bio-oil production. The stability of the bio-oil will be determined by viscosity, oxygen content, and acidity determinations in real and accelerated measurements. A multi-faceted team has been assembled to handle laboratory demonstration studies and computational analysis for optimization and scaleup.

  14. Economic assessment of proposed electric-discharge non-thermal plasma field-pilot demonstration units for NO{sub x} removal in jet-engine exhaust: White paper for SERDP Project CP-1038

    SciTech Connect (OSTI)

    Rosocha, L.A.; Chang, J.S.; Urashima, Kuniko; Kim, S.J.; Miziolek, A.W.

    1999-01-05

    This project is currently evaluating non-thermal plasma (NTP) technologies for treating jet-engine exhaust arising from DoD test facilities. In the past, some economic analyses for NTP de-NO{sub x} have shown that it is not economical, compared to other techniques. The main reasons for this conclusion was that the previous analyses examined stand-alone, or less mature electrical-discharge reactors, or electron-beam based systems that incorporated both chemical additives and quite expensive electron accelerators. Also, in contrast to more recent developments, both the discharge and electron-beam techniques of the past did not extensively incorporate methods to increase the yields of active NO{sub x}-decomposing species. In an earlier White paper and a Project Report, the authors have analyzed the costs of more mature NTP systems incorporating chemical additives and new-concept NTP technologies for jet-engine emissions control and have shown lower exhaust-gas treatment costs for NTP systems compared to baseline standard de-NO{sub x} technologies like Selective Catalytic Reduction (SCR) combined with a wet scrubber or SCR combined with an electrostatic precipitator (ESP). In this paper, the authors will examine their most-promising candidate NTP reactor systems for a field-pilot demonstration on jet-engine exhaust and discuss the economic analyses for these hybrid units, which show that the economics of the proposed candidate systems are more favorable than earlier NTP reactor economic-assessment conclusions for NO{sub x} removal.

  15. Guideline for Evaluating Analytical Chemistry Capabilities and Recommending Upgraded Methods and Instrumentation for Nuclear Material Control and Accountability at Russian Nuclear Facilities

    SciTech Connect (OSTI)

    Russ, G.P.

    1999-10-21

    Analytical chemistry plays a key role in nuclear material control and accounting (MC and A). A large part of Special Nuclear Material (SNM) inventories and virtually all of the highly attractive SNM inventories are based on sampling bulk materials followed by destructive assay (DA) of these materials. These measurements support MC and A in process control, physical inventory verification, evaluation of the effects of process changes, detecting and resolving shipper-receiver differences, and the resolution of inspector-facility differences. When evaluating these important functions, US Project Teams need to carefully assess the existing Russian analytical chemistry capabilities and to specify appropriate upgrades where needed. This evaluation and the specification of upgrades have proven difficult, in part, because of the highly specialized and technical nature of DA and because of the wide variety of methods and applications. In addition, providing a DA capability to a Russian analytical laboratory requires much more than simply supplying new instrumentation. Experience has shown that DA upgrades at Russian analytical facilities require more support equipment than was originally anticipated by US Teams. The purpose of this guidance document is to: (1) recommend criteria for US Projects Teams to use in their evaluation of Russian DA capabilities; (2) provide a basis for selection of appropriate upgrades where capabilities are inadequate to support MC and A goals; and (3) to provide a list of Da methods suitable for MC and A with the following information: performance and applications information, strengths and limitations, and references and information on cost. Criteria for evaluating existing capabilities and determining appropriate upgrades are difficult to define. However, this is the basic information needed by the US project Teams. Section IV addresses these criteria.

  16. EA-1968: Site-Wide Environmental Assessment of the U.S. Department of Energy National Renewable Energy Laboratory (NREL) South Table Mountain (STM) Campus, Golden, Colorado

    Broader source: Energy.gov [DOE]

    DOE is preparing a Site-Wide Environmental Assessment to analyze the potential environmental impacts of possible site operations and improvements over the next five to ten years at DOE’s STM campus of NREL and nearby leased support facilities in Golden, Colorado. This proposed action would support DOE’s mission to research, develop, and deploy energy efficiency and renewable energy technologies and would consist of: • Research, routine laboratory, and site operation enhancements • New building construction and modifications of existing buildings • Infrastructure and utilities upgrades and enhancements

  17. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General User Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the

  18. Requests for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requests for Proposals Requests for Proposals World-class experts and capabilities countering all aspects of explosive threats, and aiming predominantly at enhanced detection capabilities. What LACED cannot do LACED is prohibited by US Federal Law from responding to RFPs on its own or as a co-respondent. Organizations responding to a RFP can reference a "unique" capability or service available at LACED in an RFP proposal response. Such a reference should specify that LACED

  19. Proposed Rules Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5383 Vol. 81, No. 21 Tuesday, February 2, 2016 DEPARTMENT OF ENERGY 10 CFR Part 900 RIN 1901-AB36 Coordination of Federal Authorizations for Electric Transmission Facilities AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of proposed rulemaking. SUMMARY: The Department of Energy (DOE) proposes to amend its regulations for the timely coordination of Federal Authorizations for proposed interstate electric transmission facilities pursuant to

  20. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 Neutron and Nuclear Science Facility Call for Proposals Proposal Submission Neutron and Nuclear Science Facility (WNR and Lujan Center) Deadline: Friday, April 29, 2016, 5:00 pm (MDT). lansce.lanl.gov wnr.lanl.gov The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for Nuclear Science at the Lujan Center and WNR Facility for the upcoming run cycle - September 2016 - February 2017. The Neutron and Nuclear Science Research Facility (WNR) and Lujan Center provide