National Library of Energy BETA

Sample records for assessment opa opa

  1. Project Assessment (OPA) Homepage | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programs » OPA Home Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Federal Project Director of the Year Mr. Frank Crescenzo, Federal Project Director for NSLS-II at BNL For demonstrating exceptional leadership and project

  2. Tanker owners cope with OPA, but

    SciTech Connect (OSTI)

    Not Available

    1992-07-27

    This paper reports that the Petroleum Industry Research Foundation Inc. (Pirinc), New York, reports the world tanker industry is learning to live with tough provisions of the US's Oil Pollution Act (OPA) of 1990. But serious problems lie over the horizon. In a report prepared under contract for the Department of Energy, Pirinc noted US waterborne oil imports totaled 6.5 million b/d in 1991, three fourths of which was crude oil, and are expected to rise by almost 3 million b/d by 2000.

  3. Mitochondrial remodeling following fission inhibition by 15d-PGJ2 involves molecular changes in mitochondrial fusion protein OPA1

    SciTech Connect (OSTI)

    Kar, Rekha; Department of Biochemistry, UT Health Science Center at San Antonio, San Antonio, TX 78229 ; Mishra, Nandita; Singha, Prajjal K.; Venkatachalam, Manjeri A.; Department of Biochemistry, UT Health Science Center at San Antonio, San Antonio, TX 78229 ; Saikumar, Pothana

    2010-09-03

    Research highlights: {yields} Chemical inhibition of fission protein Drp1 leads to mitochondrial fusion. {yields} Increased fusion stimulates molecular changes in mitochondrial fusion protein OPA1. {yields} Proteolysis of larger isoforms, new synthesis and ubiquitination of OPA1 occur. {yields} Loss of mitochondrial tubular rigidity and disorganization of cristae. {yields} Generation of large swollen dysfunctional mitochondria. -- Abstract: We showed earlier that 15 deoxy {Delta}{sup 12,14} prostaglandin J2 (15d-PGJ2) inactivates Drp1 and induces mitochondrial fusion . However, prolonged incubation of cells with 15d-PGJ2 resulted in remodeling of fused mitochondria into large swollen mitochondria with irregular cristae structure. While initial fusion of mitochondria by 15d-PGJ2 required the presence of both outer (Mfn1 and Mfn2) and inner (OPA1) mitochondrial membrane fusion proteins, later mitochondrial changes involved increased degradation of the fusion protein OPA1 and ubiquitination of newly synthesized OPA1 along with decreased expression of Mfn1 and Mfn2, which likely contributed to the loss of tubular rigidity, disorganization of cristae, and formation of large swollen degenerated dysfunctional mitochondria. Similar to inhibition of Drp1 by 15d-PGJ2, decreased expression of fission protein Drp1 by siRNA also resulted in the loss of fusion proteins. Prevention of 15d-PGJ2 induced mitochondrial elongation by thiol antioxidants prevented not only loss of OPA1 isoforms but also its ubiquitination. These findings provide novel insights into unforeseen complexity of molecular events that modulate mitochondrial plasticity.

  4. Modulation of mitochondrial function and morphology by interaction of Omi/HtrA2 with the mitochondrial fusion factor OPA1

    SciTech Connect (OSTI)

    Kieper, Nicole; Holmstroem, Kira M.; Ciceri, Dalila; Fiesel, Fabienne C.; Wolburg, Hartwig; Ziviani, Elena; Whitworth, Alexander J.; Martins, L. Miguel; Kahle, Philipp J.; Krueger, Rejko

    2010-04-15

    Loss of Omi/HtrA2 function leads to nerve cell loss in mouse models and has been linked to neurodegeneration in Parkinson's and Huntington's disease. Omi/HtrA2 is a serine protease released as a pro-apoptotic factor from the mitochondrial intermembrane space into the cytosol. Under physiological conditions, Omi/HtrA2 is thought to be involved in protection against cellular stress, but the cytological and molecular mechanisms are not clear. Omi/HtrA2 deficiency caused an accumulation of reactive oxygen species and reduced mitochondrial membrane potential. In Omi/HtrA2 knockout mouse embryonic fibroblasts, as well as in Omi/HtrA2 silenced human HeLa cells and Drosophila S2R+ cells, we found elongated mitochondria by live cell imaging. Electron microscopy confirmed the mitochondrial morphology alterations and showed abnormal cristae structure. Examining the levels of proteins involved in mitochondrial fusion, we found a selective up-regulation of more soluble OPA1 protein. Complementation of knockout cells with wild-type Omi/HtrA2 but not with the protease mutant [S306A]Omi/HtrA2 reversed the mitochondrial elongation phenotype and OPA1 alterations. Finally, co-immunoprecipitation showed direct interaction of Omi/HtrA2 with endogenous OPA1. Thus, we show for the first time a direct effect of loss of Omi/HtrA2 on mitochondrial morphology and demonstrate a novel role of this mitochondrial serine protease in the modulation of OPA1. Our results underscore a critical role of impaired mitochondrial dynamics in neurodegenerative disorders.

  5. Copper deficiency alters cell bioenergetics and induces mitochondrial fusion through up-regulation of MFN2 and OPA1 in erythropoietic cells

    SciTech Connect (OSTI)

    Bustos, Rodrigo I.; Jensen, Erik L.; Ruiz, Lina M.; Rivera, Salvador; Ruiz, Sebastin; Simon, Felipe; Riedel, Claudia; Millennium Institute of Immunology and Immunotherapy, Santiago ; Ferrick, David; Elorza, Alvaro A.

    2013-08-02

    Highlights: In copper deficiency, cell proliferation is not affected. In turn, cell differentiation is impaired. Enlarged mitochondria are due to up-regulation of MNF2 and OPA1. Mitochondria turn off respiratory chain and ROS production. Energy metabolism switch from mitochondria to glycolysis. -- Abstract: Copper is essential in cell physiology, participating in numerous enzyme reactions. In mitochondria, copper is a cofactor for respiratory complex IV, the cytochrome c oxidase. Low copper content is associated with anemia and the appearance of enlarged mitochondria in erythropoietic cells. These findings suggest a connection between copper metabolism and bioenergetics, mitochondrial dynamics and erythropoiesis, which has not been explored so far. Here, we describe that bathocuproine disulfonate-induced copper deficiency does not alter erythropoietic cell proliferation nor induce apoptosis. However it does impair erythroid differentiation, which is associated with a metabolic switch between the two main energy-generating pathways. That is, from mitochondrial function to glycolysis. Switching off mitochondria implies a reduction in oxygen consumption and ROS generation along with an increase in mitochondrial membrane potential. Mitochondrial fusion proteins MFN2 and OPA1 were up-regulated along with the ability of mitochondria to fuse. Morphometric analysis of mitochondria did not show changes in total mitochondrial biomass but rather bigger mitochondria because of increased fusion. Similar results were also obtained with human CD34+, which were induced to differentiate into red blood cells. In all, we have shown that adequate copper levels are important for maintaining proper mitochondrial function and for erythroid differentiation where the energy metabolic switch plus the up-regulation of fusion proteins define an adaptive response to copper deprivation to keep cells alive.

  6. Project Management | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Project Assessment (OPA) OPA Home About Project ... Rates Earned Value Management System (EVMS) Certifications ... Project Assessment U.S. Department of Energy SC-28...

  7. Biodegradation of oil refinery wastes under OPA and CERCLA

    SciTech Connect (OSTI)

    Gamblin, W.W.; Banipal, B.S.; Myers, J.M.

    1995-12-31

    Land treatment of oil refinery wastes has been used as a disposal method for decades. More recently, numerous laboratory studies have been performed attempting to quantify degradation rates of more toxic polycyclic aromatic hydrocarbon compounds (PAHs). This paper discusses the results of the fullscale aerobic biodegradation operations using land treatment at the Macmillan Ring-Free Oil refining facility. The tiered feasibility approach of evaluating biodegradation as a treatment method to achieve site-specific cleanup criteria, including pilot biodegradation operations, is discussed in an earlier paper. Analytical results of biodegradation indicate that degradation rates observed in the laboratory can be met and exceeded under field conditions and that site-specific cleanup criteria can be attained within a proposed project time. Also prevented are degradation rates and half-lives for PAHs for which cleanup criteria have been established. PAH degradation rates and half-life values are determined and compared with the laboratory degradation rates and half-life values which used similar oil refinery wastes by other in investigators (API 1987).

  8. SC Federal Project Directors | U.S. DOE Office of Science (SC...

    Office of Science (SC) Website

    Federal Project Directors (FPD) and FPD Resources Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD ...

  9. SC FPD 360 Mentoring | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    SC FPD 360 Mentoring Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal ...

  10. Other Links | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Other Links Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project ...

  11. https://www.justice.gov/opa/pr/lockheed-martin-agrees-pay-5-mil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monday, February 29, 2016 JUSTICE NEWS Department of Justice Office of Public Affairs Lockheed Martin Agrees to Pay $5 Million to Settle Alleged Violations of the False Claims Act and the Resource Conservation and Recovery Act Lockheed Martin Corporation and subsidiaries Lockheed Martin Energy Systems and Lockheed Martin Utility Services (collectively, Lockheed Martin) have agreed to pay the United States $5 million to resolve allegations that they violated the Resource Conservation and Recovery

  12. Jobs | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jobs Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Jobs Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us About Jobs Print Text Size: A A A FeedbackShare Page Current Open Federal Positions The Office of Project Assessment is

  13. Project Development | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    ... Science, Office of Project Assessment (OPA) web site for several summary documents describing the DOE O 413.3B requirements and as they are implemented by the Office of Science). ...

  14. Review Dates (updated August 2016) | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Review Dates (updated August 2016) Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us SC Projects Review Dates (updated August 2016) Print Text Size: A A A

  15. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  16. Department of Energy | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Department of Energy Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000

  17. Ongoing Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Current Projects Print Text Size:

  18. Various Project Management Reports | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Various Project Management Reports Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown

  19. Lessons Learned | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lessons Learned Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E:

  20. About | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Jobs Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us About Print Text Size: A A A FeedbackShare Page Click to enlarge photo. Enlarge Photo The Spallation Neutron Source and

  1. Engineering Design Inspection and Administrative EDIA | U.S. DOE Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science (SC) EDIA Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301)

  2. Escalation Rates | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Escalation Rates Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E:

  3. Processes & Procedures | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Processes and Procedures Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Department of Energy Office of Science Various Project Management Reports Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000

  4. Project Construction Photos | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Construction Photos Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us SC Projects Project Construction Photos Print Text

  5. Cost & Contingency | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cost & Contingency Project Assessment (OPA) OPA Home About Project Management Processes and Procedures Cost & Contingency EDIA Escalation Rates Earned Value Management System (EVMS) Certifications Awards Lessons Learned Tools & Resources SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301)

  6. A review of selected energy-related data sets

    SciTech Connect (OSTI)

    Nicholls, A.K.; Elliott, D.B.; Jones, M.L.; Hannifan, J.M.; Degroat, K.J.; Eichner, M.J.; King, J.E.

    1992-09-01

    DOE`s Office of Planning and Assessment (OPA) performs crosscutting technical, policy, and environmental assessments of energy technologies and markets. To support these efforts, OPA is in the process of creating a data base management system (DBMS) that will include relevant data compiled from other sources. One of the first steps is a review of selected data sets that may be considered for inclusion in the DBMS. The review covered data sets in five categories: buildings-specific data, industry-specific data, transportation-specific data, utilities-specific data, and crosscutting/general data. Reviewed data sets covered a broad array of energy efficiency, renewable, and/or benchmark technologies. Most data sets reviewed in this report are sponsored by Federal government entities and major industry organizations. Additional data sets reviewed are sponsored by the states of California and New York and regional entities in the Pacific Northwest. Prior to full review, candidate data sets were screened for their utility to OPA. Screening criteria included requirements that a data set be particularly applicable to OPA`s data needs, documented, current, and obtainable. To fully implement its DBMS, OPA will need to expand the review to other data sources, and must carefully consider the implications of differing assumptions and methodologies when comparing data.

  7. A review of selected energy-related data sets

    SciTech Connect (OSTI)

    Nicholls, A.K.; Elliott, D.B.; Jones, M.L. ); Hannifan, J.M.; Degroat, K.J.; Eichner, M.J.; King, J.E. )

    1992-09-01

    DOE's Office of Planning and Assessment (OPA) performs crosscutting technical, policy, and environmental assessments of energy technologies and markets. To support these efforts, OPA is in the process of creating a data base management system (DBMS) that will include relevant data compiled from other sources. One of the first steps is a review of selected data sets that may be considered for inclusion in the DBMS. The review covered data sets in five categories: buildings-specific data, industry-specific data, transportation-specific data, utilities-specific data, and crosscutting/general data. Reviewed data sets covered a broad array of energy efficiency, renewable, and/or benchmark technologies. Most data sets reviewed in this report are sponsored by Federal government entities and major industry organizations. Additional data sets reviewed are sponsored by the states of California and New York and regional entities in the Pacific Northwest. Prior to full review, candidate data sets were screened for their utility to OPA. Screening criteria included requirements that a data set be particularly applicable to OPA's data needs, documented, current, and obtainable. To fully implement its DBMS, OPA will need to expand the review to other data sources, and must carefully consider the implications of differing assumptions and methodologies when comparing data.

  8. Location | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Location Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Jobs Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us About Location Print Text Size: A A A FeedbackShare Page The Office of Project Assessment is located at: Room #D-222

  9. Navigation and vessel inspection circular No. 10-94. Guidance for determination and documentation of the Oil Pollution Act of 1990 (OPA 90) phase-out schedule for existing single hull vessels carrying oil in bulk. Final report

    SciTech Connect (OSTI)

    1994-12-22

    The purpose of this Circular is to provide guidance regarding the determination and documentation of phase-out dates for single hull vessels subject to chapter 37 of Title 46, U.S. Code, constructed or adapted to carry or that carry oil in bulk as cargo or cargo residue and operating on waters subject to the jurisdiction of the United States.

  10. SC Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    OPA Home About Project Management SC Projects Review Dates (updated July 2016) Project Construction Photos Other Links SC Federal Project Directors (FPD) and FPD Resources Contact ...

  11. SOLAR MIXTURE OPACITY CALCULATIONS USING DETAILED CONFIGURATION AND LEVEL ACCOUNTING TREATMENTS

    SciTech Connect (OSTI)

    Blancard, Christophe; Cosse, Philippe; Faussurier, Gerald

    2012-01-20

    An opacity model (OPAS) combining detailed configuration and level accounting treatments has been developed to calculate radiative opacity of plasmas in local thermodynamic equilibrium. The model is presented and used to compute spectral opacities of a solar mixture. Various density-temperature couples have been considered from the solar center up to the vicinity of the radiative/convective zone interface. For a given solar thermodynamic path, OPAS calculations are compared to Opacity Project (OP) and OPAL data. Rosseland mean opacity values are in very good agreement over all the considered solar thermodynamic path, while OPAS and OP spectral opacities of each element may vary considerably. Main sources of discrepancy are discussed.

  12. Oil Pollution Act | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Oil Pollution ActLegal Abstract The Oil Pollution Act (OPA) of 1990 streamlined and...

  13. Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of the Surveillance Program of the High-Level Waste Storage Tanks at Hanford :.~I LALI i~E REJ 163 ROOM 1t 4 F77L.~ ~ -_77 .:earmn OfEeg Asitn Sertr fo niomn 4 z. r _________ rment of the Surveilance Prograrn of the High-Level Storage- Tanks at Hanford P. E WOOD Robert J. Catln, Deputy Directat - Office of Environmental Compliance and Overview Office of Environment MARCH 1980 Report to the U.S. Departrent of Energy Assistant Secretary for Environment Washkngon, DC C March 27, 1980

  14. Deadline near for compliance with U. S. oil spill liability rules

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    The petroleum industry is keeping a close watch on the approaching deadline for compliance with tough new US rules on fiscal liability for oil spills. Interim final rules scheduled to go into effect Dec. 28 stem from the Oil Pollution Act of 1990 (OPA90). The designation of interim final'' rules leaves room for final adjustments on narrow issues. But in general, the rule swill stand as presently structured. OPA90 imposes liability for oil discharges from US and non-US flagged tankers, as well as ports, terminals, and offshore pipelines and other facilities. Tanker operators have voiced the most vigorous opposition to OPA90 because it could expose them to unlimited liability for damage caused by spills and will impose a phaseout on single hull tankers plying US waters. Scheduled to replace such takers are double hull vessels that carry a much bigger price tag. The paper describes provisions of OPA90, the current situation related to insurance coverage, pro and cons to the new rule, cost issues, oil firms, views, new insurers, and the mandatory excess insurance facility proposal.

  15. Transporting US oil imports: The impact of oil spill legislation on the tanker market. Draft final report

    SciTech Connect (OSTI)

    Rowland, P.J.

    1992-05-01

    The Oil Pollution Act of 1990 (``OPA``) and an even more problematic array of State pollution laws have raised the cost, and risk, of carrying oil into and out of the US. This report, prepared under contract to the US Department of energy`s Office of Domestic and International Policy, examines the impact of Federal and State oil spill legislation on the tanker market. It reviews the role of marine transportation in US oil supply, explores the OPA and State oil spill laws, studies reactions to OPA in the tanker and tank barge industries and in related industries such as insurance and ship finance, and finally, discusses the likely developments in the years ahead. US waterborne oil imports amounted to 6.5 million B/D in 1991, three-quarters of which was crude oil. Imports will rise by almost 3 million B/D by 2000 according to US Department of energy forecasts, with most of the crude oil growth after 1995. Tanker demand will grow even faster: most of the US imports and the increased traffic to other world consuming regions will be on long-haul trades. Both the number of US port calls by tankers and the volume of offshore lightering will grow. Every aspect of the tanker industry`s behavior is affected by OPA and a variety of State pollution laws.

  16. Transporting US oil imports: The impact of oil spill legislation on the tanker market

    SciTech Connect (OSTI)

    Rowland, P.J. Associates )

    1992-05-01

    The Oil Pollution Act of 1990 ( OPA'') and an even more problematic array of State pollution laws have raised the cost, and risk, of carrying oil into and out of the US. This report, prepared under contract to the US Department of energy's Office of Domestic and International Policy, examines the impact of Federal and State oil spill legislation on the tanker market. It reviews the role of marine transportation in US oil supply, explores the OPA and State oil spill laws, studies reactions to OPA in the tanker and tank barge industries and in related industries such as insurance and ship finance, and finally, discusses the likely developments in the years ahead. US waterborne oil imports amounted to 6.5 million B/D in 1991, three-quarters of which was crude oil. Imports will rise by almost 3 million B/D by 2000 according to US Department of energy forecasts, with most of the crude oil growth after 1995. Tanker demand will grow even faster: most of the US imports and the increased traffic to other world consuming regions will be on long-haul trades. Both the number of US port calls by tankers and the volume of offshore lightering will grow. Every aspect of the tanker industry's behavior is affected by OPA and a variety of State pollution laws.

  17. Injection-seeded optical parametric oscillator and system

    DOE Patents [OSTI]

    Lucht, Robert P.; Kulatilaka, Waruna D.; Anderson, Thomas N.; Bougher, Thomas L.

    2007-10-09

    Optical parametric oscillators (OPO) and systems are provided. The OPO has a non-linear optical material located between two optical elements where the product of the reflection coefficients of the optical elements are higher at the output wavelength than at either the pump or idler wavelength. The OPO output may be amplified using an additional optical parametric amplifier (OPA) stage.

  18. Tanker industry progressing in cleaning up operations

    SciTech Connect (OSTI)

    Knott, D.

    1993-10-18

    The international tanker industry has made significant strides in improving the safety and environmental awareness of its operations in recent years. With a string of mishaps following the Exxon Valdez spill, public scrutiny focused on the tanker industry and found it lacking. The U.S. government reacted strongly with the Oil Pollution Act of 1990. OPA 90 set narrow requirements for tanker construction, forced the creation of a national spill response program, and made tanker operators solely liable for spill damage. The Aegean Sea and Braer accidents around the end of last year forced the pace of European legislation. Since then global initiatives have been announced to improve design and maintenance of tankers and take steps toward eliminating substandard ships and operators. The paper discusses priorities, tanker design, the tanker fleet, OPA status, spill response, the Tampa Bay spill, spill liability, European spills, EC legislation, and the Department of Transportation inquiry.

  19. Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... SCADA Assessments Since 1999, Sandia has conducted numerous assessments of operational systems in hydroelectric dams; water treatment systems; electric power transmission, ...

  20. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environment, Safety and Health Assessments Environment, Safety and Health Assessments The Department of Energy's Office of Environment, Safety and Health Assessments, within the Office of Enterprise Assessments, is responsible for conducting assessments to provide information on programs and performance in protecting our workers, the public, and environment from hazards present at Department sites and operations. This information provides assurance to our stakeholders and identifies areas for

  1. ASSESSMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspector General SUBJECT: INFORMATION: Assessment Report on "Audit Coverage of Cost Allowability for Babcock & Wilcox Technical Services Pantex LLC During Fiscal Year 2013 ...

  2. Consequence Assessment

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

  3. Technology Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - FOR OFFICIAL USE ONLY - DRAFT 1 Advanced Composites Materials and their Manufacture 1 Technology Assessment 2 Contents 3 1. Introduction to the Technology/System ................................................................................................ 2 4 2. Technology Potential and Assessment .................................................................................................. 4 5 2.1 The Potential for Advanced Composites for Clean Energy Application Areas

  4. Risk Assessment

    Broader source: Energy.gov [DOE]

    A set of issues that state and local governments should carefully consider, with the goal of helping them assess and anticipate solutions for some worst case or unfortunate case scenarios as they...

  5. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT

  6. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION

  7. Enterprise Assessments Assessment of Construction Quality at...

    Energy Savers [EERE]

    Enterprise Assessments Assessment of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant - June 2016 June 2016 Assessment of Construction Quality at ...

  8. Enterprise Assessments Emergency Management Assessment of the...

    Office of Environmental Management (EM)

    Emergency Management Assessment of the Waste Isolation Pilot Plant - April 2016 Enterprise Assessments Emergency Management Assessment of the Waste Isolation Pilot Plant - April ...

  9. Technology Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roll to Roll (R2R) Processing 1 Technology Assessment 2 3 Contents 4 1. Introduction to the Technology/System ............................................................................................... 2 5 1.1. Introduction to R2R Processing..................................................................................................... 2 6 1.2. R2R Processing Mechanisms ......................................................................................................... 3 7 2.

  10. Endogenous Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Endogenous Assessment of the Capacity Value of Solar PV in Generation Investment Planning Studies Francisco D. Munoz, Member, IEEE, and Andrew D. Mills Abstract-There exist several different reliability- and approximation-based methods to determine the contribution of solar resources towards resource adequacy. However, most of these approaches require knowing in advance the installed capacities of both conventional and solar generators. This is a complication since generator capacities are

  11. Probabilistic oil outflow analysis of double hull with mid-deck tanker design. Final report

    SciTech Connect (OSTI)

    1992-11-24

    The risk of environmental damage from tankers has been the subject of considerable research and debate. Quantitative methods are important because the Oil Pollution Act of 1990 (OPA `90) regulations mandate that a study be carried out to determine whether other structural or operational tank vessel requirements would provide protection to the environment equal to, or greater than, double hull tanker designs. To evaluate alternative designs a rationally developed methodology based on expected oil outflow should be used. Herbert Engineering Corp. (HEC) was tasked to use this methodology to study five design variations of three tanker sizes utilizing damage statistics for tankers. A total of fifteen design configurations were studied.

  12. Solar axion flux from the axion-electron coupling

    SciTech Connect (OSTI)

    Redondo, Javier

    2013-12-01

    In non-hadronic axion models, where axions couple to electrons at tree level, the solar axion flux is completely dominated by the ABC reactions (Atomic recombination and deexcitation, Bremsstrahlung and Compton). In this paper the ABC flux is computed from available libraries of monochromatic photon radiative opacities (OP, LEDCOP and OPAS) by exploiting the relations between axion and photon emission cross sections. These results turn to be ? 30% larger than previous estimates due to atomic recombination (free-bound electron transitions) and deexcitation (bound-bound), which where not previously taken into account.

  13. Attachment A -- Deliverables.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4: Unrevised SFO Paragraphs Reissued Attachment 4: Unrevised SFO Paragraphs Reissued Unrevised SFO Paragraphs Reissued (35.68 KB) More Documents & Publications Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Attachment 1: Green Lease Policies and Procedures for Lease Acquisition 1

    B - J Deliverables Attachment A TOC Deliverables DE-AC27-08RV14800 SEC. Contract Section Description Action Timing TFP CO ESQ OPA IR/HR ORP MGR DCAA B B.2 Modify contract to obligate

  14. Attachment A -- Deliverables.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I Deliverables Attachment A TOC Deliverables DE-AC27-08RV14800 SEC. FAR/DEAR Clause Reference Description Action Timing TFP CO ESQ OPA IR/HR ORP MGR DCAA I.2 FAR 52.202-1 Definitions (JUL 2004) as supplemented by DEAR 952.202-1 (Mar 2002) Verify compliance As Required L I.3 FAR 52.203-3 Gratuities (APR 1984) Verify compliance As Required L I.4 FAR 52.203-5 Covenant Against Contingent Fees (APR 1984) Verify compliance As Required L I.5 FAR 52.203-6 Restrictions on Subcontractor Sales to the

  15. ASSESSMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brookhaven Science Associates LLC During Fiscal Years 2012 and 2013 Under Department of Energy Contract No. DE-AC02-98CH10886 OAI-V-16-03 January 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 January 19, 2016 MEMORANDUM FOR THE MANAGER, BROOKHAVEN SITE OFFICE FROM: Jack Rouch, Director Central Audits Division Office of Inspector General SUBJECT: INFORMATION: Assessment Report: "Audit Coverage of Cost

  16. ASSESSMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the University of California During Fiscal Years 2013 and 2014 Under Department of Energy Contract No. DE-AC02-05CH11231 OAI-V-16-10 June 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 June 28, 2016 MEMORANDUM FOR THE MANAGER, BERKELEY SITE OFFICE FROM: David Sedillo Deputy Assistant Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Assessment Report on "Audit

  17. An Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessment of Coupling Algorithms for Nuclear Reactor Core Physics Simulations $ Steven Hamilton a,∗ , Mark Berrill a , Kevin Clarno a , Roger Pawlowski b a Oak Ridge National Laboratory, 1 Bethel Valley Rd., Oak Ridge, TN 37831 U.S.A. b Sandia National Laboratories, MS 0316, P.O. Box 5800, Albuquerque, NM 87185 U.S.A. Abstract This paper evaluates the performance of multiphysics coupling algorithms on a light water nuclear reactor core simulation. The simulation couples the k-eigenvalue form

  18. ASSESSMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UT-Battelle LLC During Fiscal Year 2014 Under Department of Energy Contract No. DE-AC05-00OR22725 OAI-V-16-11 July 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 July 29, 2016 MEMORANDUM FOR THE MANAGER, OAK RIDGE NATIONAL LABORATORY SITE OFFICE FROM: Debra K. Solmonson Deputy Assistant Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Assessment Report on the

  19. Enterprise Assessments Assessment of Construction Quality and...

    Broader source: Energy.gov (indexed) [DOE]

    April 2016 Assessment of Construction Quality and the Fire Protection program at the ... (EA) conducted an assessment of construction quality and the fire protection ...

  20. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  1. Human Reliability Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Signup SlideShare Human Reliability Assessment HomeStationary PowerNuclear EnergyNuclear Energy Safety TechnologiesRisk and Safety AssessmentHuman Reliability Assessment ...

  2. Evaluating the Effect of Upgrade, Control and Development Strategies on Robustness and Failure Risk of the Power Transmission Grid

    SciTech Connect (OSTI)

    Newman, David E; Carreras, Benjamin A; Lynch, Vickie E; Dobson, Ian

    2008-01-01

    We use the OPA complex systems model of the power transmission system to investigate the effect of a series of different network upgrade scenarios on the long time dynamics and the probability of large cascading failures. The OPA model represents the power grid at the level of DC load flow and LP generation dispatch and represents blackouts caused by randomly triggered cascading line outages and overloads. We examine the effect of increased component reliability on the long-term risks, the effect of changing operational margins and the effect of redundancy on those same long-term risks. The general result is that while increased reliability of the components decreases the probability of small blackouts, depending on the implementation, it actually can increase the probability of large blackouts. When we instead increase some types of redundancy of the system there is an overall decrease in the large blackouts. As some of these results are counter intuitive these studies suggest that care must be taken when making what seem to be logical upgrade decisions.

  3. Sandia Energy - Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resource Assessment Home Stationary Power Energy Conversion Efficiency Water Power Resource Assessment Resource AssessmentAshley Otero2016-01-05T19:06:04+00:00 Characterizing wave...

  4. Northwest Energy Market Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Northwest Energy Market Assessment Pages Northwest-Energy-Market-Assessment Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

  5. ORISE: Hazard Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    internal and external radiation dose assessments. Our capabililities include: Linkage of exposure data to site rosters Assessment of retrospective exposures Preparation of...

  6. Survey of Biomass Resource Assessments and Assessment Capabilities...

    Open Energy Info (EERE)

    Biomass Resource Assessments and Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in...

  7. Sandia Energy - Solar Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Resource Assessment Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Resource Assessment Solar Resource AssessmentTara...

  8. Paducah Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

  9. ORISE: Hazard Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazard Assessments The Oak Ridge Institute for Science and Education (ORISE) analyzes accumulated data to identify potential workplace hazards to which individuals or groups of workers may be exposed. ORISE assesses both chemical and radiation exposures, and conducts both internal and external radiation dose assessments. Our capabililities include: Linkage of exposure data to site rosters Assessment of retrospective exposures Preparation of assessment protocols Design and testing of dose

  10. Distributed road assessment system

    DOE Patents [OSTI]

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  11. Caraustar Industries Energy Assessment

    SciTech Connect (OSTI)

    2010-06-25

    This plant-wide assessment case study is about commissioned energy assessments by the U.S. Department of Energy Industrial Technologies Program at two of Caraustar's recycled paperboard mills.

  12. Home Energy Assessments

    Broader source: Energy.gov [DOE]

    A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy...

  13. Solar Resource Assessment

    SciTech Connect (OSTI)

    Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

    2008-02-01

    This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

  14. ORISE: Environmental assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental assessments An ORISE technicians performs an environmental assessment The Oak Ridge Institute for Science and Education (ORISE) performs independent, objective environmental assessments to define the extent of radiological contamination at sites scheduled for decontamination and decommissioning (D&D). A fundamental aspect of all D&D projects, these environmental assessments provide guidance to determine the best remediation procedures and are a cost-effective method of

  15. Assessing the assessments: Pharmaceuticals in the environment

    SciTech Connect (OSTI)

    Enick, O.V. Moore, M.M.

    2007-11-15

    The relatively new issue of pharmaceutical contamination of the environment offers the opportunity to explore the application of values to the construction, communication and management of risk. The still-developing regulatory policies regarding environmental contamination with pharmaceuticals provide fertile ground for the introduction of values into the definition and management of risk. In this report, we summarize the current knowledge regarding pharmaceutical contamination of the environment and discuss specific attributes of pharmaceuticals that require special consideration. We then present an analysis showing that if values are incorporated into assessing, characterizing and managing risk, the results of risk assessments will more accurately reflect the needs of various stakeholders. Originating from an acknowledgement of the inherent uncertainty and value-laden nature of risk assessment, the precautionary principle (and later, the multi-criteria, integrated risk assessment), provides a direction for further research and policy development.

  16. Management Assessment and Independent Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-31

    The revision to this Guide reflects current assessment practices, international standards, and changes in the Department of Energy expectations. Cancels DOE G 414.1-1. Canceled by DOE G 414.1-1B.

  17. Industrial Energy Efficiency Assessments

    Broader source: Energy.gov (indexed) [DOE]

    Energy Efficiency Assessments Lynn Price Staff Scientist China Energy Group Energy Analysis Department Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Industrial Energy Efficiency Assessments - Definition and overview of key components - International experience - Chinese situation and recommendations - US-China collaboration Industrial Energy Efficiency Assessments - Analysis of the use of energy and potential for energy efficiency in an industrial facility *

  18. Risk Assessment & Management Information

    Broader source: Energy.gov [DOE]

    NRC - A Proposed Risk Management Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010 Consortium for Risk Evaluation with Stakeholder Participation Workshop on Risk Assessment and Safety Decision Making Under Uncertainty

  19. Home Energy Assessments

    ScienceCinema (OSTI)

    Dispenza, Jason

    2013-05-29

    A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

  20. Lessons about vulnerability assessments.

    SciTech Connect (OSTI)

    Johnston, R. G.

    2004-01-01

    The Vulnerability Assessment Team (VAT) at Los Alamos National Laboratory believes that physical security can only be optimized through the use of effective vulnerability assessments. As a result of conducting vulnerability assessments on hundreds of different security devices and systems in the last few years, we have identified some of the attributes of effective assessments. These, along with our recommendations and observations about vulnerability assessments, are summarized in this paper. While our work has primarily involved physical security (in contrast to, for example, computer, network, or information security), our experiences may have applicability to other types of security as well.

  1. Enterprise Assessments Follow-up Assessment of Safety Culture...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant - June 2015 Enterprise Assessments Follow-up Assessment of Safety Culture at the Hanford...

  2. Quality Procedure - Management Assessment and Self-Assessment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Management Assessment and Self-Assessment Quality Procedure - Management Assessment and Self-Assessment This procedure establishes the roles, responsibilities, requirements, and process for conducting Environmental Management (EM) Office of Standards and Quality Assurance management assessments and self-assessments. Effective management assessments and self-assessments are built on self-evaluation, work process analysis, clear communication with management, and honest feedback that

  3. Occupant Safety Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupant Safety Assessment and Crash Biomechanics Background During crashes, vehicle occupants may experience a wide variety of injuries that often correspond to their location within the vehicle, their age and gender, and type of vehicle and crash. Current finite-element models that are used to assess the level of injuries employ only 60,000 to 100,000 elements and require 12 hours of computation to assess vehicle structural components. Occupant models mostly represent the "50% adult

  4. Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments Assessments The Department of Energy's (DOE) Enterprise Assessments programs provide DOE line management, Congress, and other stakeholders with an independent evaluation of the effectiveness of DOE policy and line management performance in safety and security, and other critical areas as directed by the Secretary of Energy. This information provides assurance to our stakeholders and identifies areas for improvement to our leadership to support the safe performance of the Department's

  5. TECHNOLOGY READINESS ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASSESSMENT JANUARY 2015 -A CHECKPOINT ALONG A CHALLENGING JOURNEY DOE/NETL-2015/1710 U.S. Department of Energy 2014 TECHNOLOGY READINESS ASSESSMENT-CLEAN COAL RESEARCH PROGRAM 2 2014 TECHNOLOGY READINESS ASSESSMENT-CLEAN COAL RESEARCH PROGRAM Office of Fossil Energy | National Energy Technology Laboratory DISCLAIMER 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor

  6. TECHNOLOGY READINESS ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any

  7. Hoisting & Rigging Assessment Form

    Broader source: Energy.gov [DOE]

      Assess the institutional and department/division hoisting and rigging (including forklift, overhead cranes small hoists, and mobile cranes) requirements, policies, procedures, and work practices...

  8. Office of Security Assessments

    Broader source: Energy.gov [DOE]

    The Office of Security Assessments is responsible for the independent evaluation of the effectiveness of safeguards and security policies and programs throughout the Department, including...

  9. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Assessments » Assessment Documents Assessment Documents RSS August 5, 2016 Enterprise Assessments Operational Awareness Record for the Assessment of the Review of Past Findings at the Waste Isolation Pilot Plant, May 17 - 19, 2016 (OAR # EA-WIPP-2016-05-17) Operational Awareness Record for the Assessment of the Review of Past Findings at the Waste Isolation Pilot Plant July 21, 2016 Enterprise Assessments Assessment of the Nevada National Security Site 2016 Full-Scale Exercise

  10. INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER

    SciTech Connect (OSTI)

    MELINDA KRAHENBUHL

    2010-05-28

    The U. S. Department of Energy’s Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

  11. CRAD, Self-Assessment Program Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of

  12. Integrated assessment briefs

    SciTech Connect (OSTI)

    1995-04-01

    Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

  13. Technical Assessment Team Report

    Broader source: Energy.gov [DOE]

    The Technical Assessment Team (TAT) is an independent team of technical experts that evaluated the mechanisms and chemical reactions contributing to the failure of a waste drum at the Waste...

  14. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  15. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15

    The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Supersedes DOE G 413.3-4.

  16. PRIVACY IMPACT ASSESSMENT: Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY

  17. Industrial Energy Efficiency Assessments

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Sandina Ponte, a member of the University of Missouri's Industrial Assessment Center, inspects equipment at a manufacturing facility during an energy audit. | Photo courtesy of University of Missouri IAC. Sandina Ponte, a member of the University of Missouri's Industrial Assessment Center, inspects equipment at a manufacturing facility during an energy audit. | Photo courtesy of University of Missouri IAC. Cassie Mills Communications Associate in the Advanced

  18. Assessing Pathways in Aruba

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Assessing Opportunity Pathways Assessing Pathways in Aruba In 2010, Prime Minister Eman of Aruba expressed an ambitious goal: to transition Aruba to 100% renew- able energy by 2020. Aruba offers a valuable example of how to approach vision and goal setting for an energy project or initiative. Challenge Strong tourism and growth in the hospitality industry are boosting economic development for the island of Aruba. However, like many islands and remote locations, Aruba must import thousands of

  19. Enterprise Assessments Assessment of Conduct of Maintenance at the Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Isolation Pilot Plant - June 2016 | Department of Energy Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 June 2016 Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant The U.S. Department of Energy Office of Environment, Safety and Health Assessments, within the independent Office of Enterprise Assessments, conducted an assessment of the conduct

  20. Enterprise Assessments Assessment of the Waste Isolation Pilot Plant Fire

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection Program - July 2016 | Department of Energy Waste Isolation Pilot Plant Fire Protection Program - July 2016 Enterprise Assessments Assessment of the Waste Isolation Pilot Plant Fire Protection Program - July 2016 July 2016 Assessment of the Fire Protection Program at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) Office of Nuclear Safety and Environmental Assessments, within the independent Office of Enterprise Assessments (EA), conducted a targeted assessment

  1. Enterprise Assessments Emergency Management Assessment of the Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Isolation Pilot Plant - April 2016 | Department of Energy Emergency Management Assessment of the Waste Isolation Pilot Plant - April 2016 Enterprise Assessments Emergency Management Assessment of the Waste Isolation Pilot Plant - April 2016 April 2016 Emergency Management Assessment of the Waste Isolation Pilot Plant - April 2016 The Office of Emergency Management Assessments, within the U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA), conducted an

  2. Enterprise Assessments Assessment of the Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Security Complex Criticality Accident Alarm System - June 2016 Enterprise Assessments Assessment of the Y-12 National Security Complex Criticality Accident Alarm System ...

  3. Enterprise Assessments Assessment of Selected Conduct of Operations...

    Energy Savers [EERE]

    Waste Isolation Pilot Plant - April 2016 Enterprise Assessments Assessment of Selected Conduct of Operations Processes at the Waste Isolation Pilot Plant - April 2016 April 2016 ...

  4. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Energy Savers [EERE]

    Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 ...

  5. Information technology resources assessment

    SciTech Connect (OSTI)

    Stevens, D.F.

    1992-01-01

    This year`s Information Technology Resources Assessment (ITRA) is something of a departure from traditional practice. Past assessments have concentrated on developments in fundamental technology, particularly with respect to hardware. They form an impressive chronicle of decreasing cycle times, increasing densities, decreasing costs (or, equivalently, increasing capacity and capability per dollar spent), and new system architectures, with a leavening of operating systems and languages. Past assessments have aimed -- and succeeded -- at putting information technology squarely in the spotlight; by contrast, in the first part of this assessment, we would like to move it to the background, and encourage the reader to reflect less on the continuing technological miracles of miniaturization in space and time and more on the second- and third-order implications of some possible workplace applications of these miracles. This Information Technology Resources Assessment is intended to provide a sense of technological direction for planners in projecting the hardware, software, and human resources necessary to support the diverse IT requirements of the various components of the DOE community. It is also intended to provide a sense of our new understanding of the place of IT in our organizations.

  6. Information technology resources assessment

    SciTech Connect (OSTI)

    Stevens, D.F.

    1992-01-01

    This year's Information Technology Resources Assessment (ITRA) is something of a departure from traditional practice. Past assessments have concentrated on developments in fundamental technology, particularly with respect to hardware. They form an impressive chronicle of decreasing cycle times, increasing densities, decreasing costs (or, equivalently, increasing capacity and capability per dollar spent), and new system architectures, with a leavening of operating systems and languages. Past assessments have aimed -- and succeeded -- at putting information technology squarely in the spotlight; by contrast, in the first part of this assessment, we would like to move it to the background, and encourage the reader to reflect less on the continuing technological miracles of miniaturization in space and time and more on the second- and third-order implications of some possible workplace applications of these miracles. This Information Technology Resources Assessment is intended to provide a sense of technological direction for planners in projecting the hardware, software, and human resources necessary to support the diverse IT requirements of the various components of the DOE community. It is also intended to provide a sense of our new understanding of the place of IT in our organizations.

  7. Small Wind Site Assessment Guidelines

    SciTech Connect (OSTI)

    Olsen, Tim; Preus, Robert

    2015-09-01

    Site assessment for small wind energy systems is one of the key factors in the successful installation, operation, and performance of a small wind turbine. A proper site assessment is a difficult process that includes wind resource assessment and the evaluation of site characteristics. These guidelines address many of the relevant parts of a site assessment with an emphasis on wind resource assessment, using methods other than on-site data collection and creating a small wind site assessment report.

  8. Performance Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Performance Assessment Performance Assessment The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE's portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 34 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN,

  9. Assess Oportunities | Open Energy Information

    Open Energy Info (EERE)

    Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities DevelopBAU Stage 4:...

  10. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment, Y-12 National Security Complex - June 2012 Assessment of Nuclear Safety Culture at the Y-12 National Security Complex Uranium Processing Facility Project July 9,...

  11. Windows technology assessment

    SciTech Connect (OSTI)

    Baron, J.J.

    1995-10-01

    This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

  12. Reactor safety assessment system

    SciTech Connect (OSTI)

    Sebo, D.E.; Bray, M.A.; King, M.A.

    1987-01-01

    The Reactor Safety Assessment System (RSAS) is an expert system under development for the United States Nuclear Regulatory Commission (USNRC). RSA is designed for use at the USNRC Operations Center in the event of a serious incident at a licensed nuclear power plant. RSAS is a situation assessment expert system which uses plant parametric data to generate conclusions for use by the NRC Reactor Safety Team. RSAS uses multiple rule bases and plant specific setpoint files to be applicable to all licensed nuclear power plants in the United States. RSAS currently covers several generic reactor categories and multiple plants within each category.

  13. Topological and thermal properties of polypropylene composites based on oil palm biomass

    SciTech Connect (OSTI)

    Bhat, A. H. E-mail: anie-yal88@yahoo.com; Dasan, Y. K. E-mail: anie-yal88@yahoo.com

    2014-10-24

    Roughness on pristine and polymer composite surfaces is of enormous practical importance for polymer applications. This study deals with the use of varying quantity of oil palm ash as a nanofiller in a polypropylene based matrix. The oil palm ash sample was preprocessed to break the particles into small diameter by using ultra sonication before using microfluidizer for further deduction in size and homogenization. The oil palm ash was made to undergo many passes through the microfluidizer for fine distribution of particles. Polypropylene based composites containing different loading percentage oil palm ash was granulated by twin screw extruder and then injection molded. The surface morphology of the OPA passed through microfluidizer was analyzed by Tapping Mode - Atomic Force Microscopy (TMAFM). Thermal analysis results showed an increase in the activation energy values. The thermal stability of the composite samples showed improvement as compared to the virgin polymer as corroborated by the on-set degradation temperatures and the temperatures at which 50% degradation occurred.

  14. Enterprise Assessments Assessment of the Y-12 National Security Complex

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Criticality Accident Alarm System - June 2016 | Department of Energy Y-12 National Security Complex Criticality Accident Alarm System - June 2016 Enterprise Assessments Assessment of the Y-12 National Security Complex Criticality Accident Alarm System - June 2016 June 2016 Assessment of the Criticality Accident Alarm System at the Y-12 National Security Complex The U.S. Department of Energy Office of Nuclear Safety and Environmental Assessments, within the Office of Enterprise Assessments

  15. Enterprise Assessments Assessment of the Nevada National Security Site 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full-Scale Exercise DORSET-16 - July 2016 | Department of Energy Assessment of the Nevada National Security Site 2016 Full-Scale Exercise DORSET-16 - July 2016 Enterprise Assessments Assessment of the Nevada National Security Site 2016 Full-Scale Exercise DORSET-16 - July 2016 July 2016 Assessment of the Nevada National Security Site 2016 Full-Scale Exercise DORSET-16 The U.S. Department of Energy (DOE) Office of Emergency Management Assessments, within the independent Office of Enterprise

  16. Additive Manufacturing Technology Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additive Manufacturing 1 Technology Assessment 2 1. Contents 3 1. Introduction to the Technology/System ............................................................................................... 2 4 1.1 Introduction to Additive Manufacturing ....................................................................................... 2 5 1.2 Additive Manufacturing Processes ............................................................................................... 2 6 1.3 Benefits of Additive

  17. Condition Assessment Information System

    Energy Science and Technology Software Center (OSTI)

    2002-09-16

    CAIS2000 records, tracks and cost maintenance deficiencies associated with condition assessments of real property assets. Cost information is available for 39,000 items in the currenht RS Means, Facilities Construction Manual. These costs can, in turn, be rolled by by asset to produce the summary condition of an asset or site.

  18. SCADA Vulnerability Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vulnerability Assessments - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  19. Human Reliability Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  20. Geothermal industry assessment

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

  1. Venetie, Alaska energy assessment.

    SciTech Connect (OSTI)

    Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

    2013-07-01

    This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

  2. Preliminary Assessment Template

    Broader source: Energy.gov [DOE]

    Document presents a template for the preliminary assessment (PA) that energy service companies (ESCOs) are required to conduct in an energy savings performance contract (ESPC) project under the U.S.Department of Energy's indefinite-delivery, indefinite-quantity ESPC contract.

  3. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15

    This document was developed to assist individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the Department of Energy (DOE) capital acquisition assets subjects to DOE O 413.3B.

  4. Ultrasonic pipe assessment

    DOE Patents [OSTI]

    Thomas, Graham H.; Morrow, Valerie L.; Levie, Harold; Kane, Ronald J.; Brown, Albert E.

    2003-12-23

    An ultrasonic pipe or other structure assessment system includes an ultrasonic transducer positioned proximate the pipe or other structure. A fluid connection between the ultrasonic transducer and the pipe or other structure is produced. The ultrasonic transducer is moved relative to the pipe or other structure.

  5. Community Readiness Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Readiness Assessments Community Readiness Assessments Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Community Readiness Assessments, Call ...

  6. Industrial Energy Efficiency Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Energy Efficiency Assessments Industrial Energy Efficiency Assessments Details about the Industrial Energy Efficiency Assessments program and its implementation in...

  7. Oak Ridge Reservation Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

  8. EA-1207: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

  9. EA-1391: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources

  10. UAIEE and Industrial Assessment Centers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    55-62011| Industrial Assessment Centers * Started in 1976 * Currently 26 Centers across the US * Almost...

  11. Bio Risk Assessment Tool

    Energy Science and Technology Software Center (OSTI)

    2004-07-22

    The Biosecurity Risk Assessment Tool (BRAT) is a new type of computer application for the screening-level assessment of risk to dairy operations. BRAT for Dairies is designed to be intuitive and easy to use. Users enter basic data-property address, feed management, employee population, and so on - into the interface. Using these data and rules found in an expert system. BRAT for Dairies consults appropriate sections of its database. The expert system determines the riskmore » implications of the basic data, e.g. diseases are closely tied to pen location with respect to the outside world, When the analysis is complete, BRAT for Dairies evaluates and allocates the risk for each hazard, ranks the risks, and displays the results graphically.« less

  12. Risk Identification and Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Identification and Assessment [Sections in brackets are for instructions; these should be deleted or replaced with specifics in the template.] Subsystem Title or Section within Subsystem [In the first column, using short bullets, fill in "what can go wrong," or a brief description of a potential benefit from a program or action. Add additional rows as necessary. Fill in the other columns using the rating guidelines in the attached reference pages.] |Risk|Probability|Impact|Risk

  13. Quantitative Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  14. Advances in Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers at Sandia National Laboratories originated an innovative approach to determining the safety of geologic repositories for radioactive waste disposal called "performance assessment", PA. The discipline of PA continues to advance within the Defense Waste Management Programs as computing capabilities advance and as the discipline is used in an expanding portfolio of applications both nationally and internationally. Do Radioactive Waste Disposal Options Assure Safety for

  15. Probabilistic Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  16. Risk and Safety Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Safety Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  17. Photovoltaic technology assessment

    SciTech Connect (OSTI)

    Backus, C.E.

    1981-01-01

    After a brief review of the history of photovoltaic devices and a discussion of the cost goals set for photovoltaic modules, the status of photovoltaic technology is assessed. Included are discussions of: current applications, present industrial production, low-cost silicon production techniques, energy payback periods for solar cells, advanced materials research and development, concentrator systems, balance-of-system components. Also discussed are some nontechnical aspects, including foreign markets, US government program approach, and industry attitudes and approaches. (LEW)

  18. Facility Environmental Vulnerability Assessment

    SciTech Connect (OSTI)

    Van Hoesen, S.D.

    2001-07-09

    From mid-April through the end of June 2001, a Facility Environmental Vulnerability Assessment (FEVA) was performed at Oak Ridge National Laboratory (ORNL). The primary goal of this FEVA was to establish an environmental vulnerability baseline at ORNL that could be used to support the Laboratory planning process and place environmental vulnerabilities in perspective. The information developed during the FEVA was intended to provide the basis for management to initiate immediate, near-term, and long-term actions to respond to the identified vulnerabilities. It was expected that further evaluation of the vulnerabilities identified during the FEVA could be carried out to support a more quantitative characterization of the sources, evaluation of contaminant pathways, and definition of risks. The FEVA was modeled after the Battelle-supported response to the problems identified at the High Flux Beam Reactor at Brookhaven National Laboratory. This FEVA report satisfies Corrective Action 3A1 contained in the Corrective Action Plan in Response to Independent Review of the High Flux Isotope Reactor Tritium Leak at the Oak Ridge National Laboratory, submitted to the Department of Energy (DOE) ORNL Site Office Manager on April 16, 2001. This assessment successfully achieved its primary goal as defined by Laboratory management. The assessment team was able to develop information about sources and pathway analyses although the following factors impacted the team's ability to provide additional quantitative information: the complexity and scope of the facilities, infrastructure, and programs; the significantly degraded physical condition of the facilities and infrastructure; the large number of known environmental vulnerabilities; the scope of legacy contamination issues [not currently addressed in the Environmental Management (EM) Program]; the lack of facility process and environmental pathway analysis performed by the accountable line management or facility owner; and poor

  19. Bridge Condition Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Condition and Performance Assessment Background How bridges respond to extreme loading conditions, such as during high winds and severe storms, and to the effects of aging, such as corrosion- and fatigue-induced cracking, is a major concern for the Federal Highway Administration (FHWA). The FHWA is working to ensure that highway structures are safe and reliable under all service conditions, including potential structural, environmental, and human-generated threats. Role of High-Performance

  20. Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  1. Fossil plant self assessment

    SciTech Connect (OSTI)

    Bozgo, R.H.; Maguire, B.A.

    1996-07-01

    The increasingly competitive environment of the electric utility business is focusing utilities attention on reducing the cost of electricity generation. By using benchmark indicators, gains are being sought in plant material condition with corresponding improvements in operating efficiency and capacity factor as well as reductions in Operating and Maintenance (O&M) costs. In designing a process for improvement, Consolidated Edison Company of New York, Inc. (Con Edison) plant managers were asked to review and approve objectives and criteria for Fossil Plant Operations. The program methods included optimizing work processes (including material condition, maintenance programs, work control systems, and personnel performance); team building techniques to foster personnel buy-in of the process; and long term cultural change to insure an ongoing continuous improvement process with measurable results. The program begins with a self assessment of each plant based upon the approved Objectives and Criteria. The Criteria and Review Approaches (CRAs) are established by senior management and the review team. The criteria cover Management, Operations, Maintenance, and Support Functions including Technical Support, Training and Qualification, Environmental Compliance, Chemistry, and Safety and Emergency Preparedness. The Assessment is followed by a review of corrective action plans and an interim corrective action review. Annual Assessments are planned to ensure continuous improvement. Emphasis is placed on progress made in maintenance at the fossil stations.

  2. Enjebi Island dose assessment

    SciTech Connect (OSTI)

    Robison, W.L.; Conrado, C.L.; Phillips, W.A.

    1987-07-01

    We have updeated the radiological dose assessment for Enjebi Island at Enewetak Atoll using data derived from analysis of food crops grown on Enjebi. This is a much more precise assessment of potential doses to people resettling Enjebi Island than the 1980 assessment in which there were no data available from food crops on Enjebi. Details of the methods and data used to evaluate each exposure pathway are presented. The terrestrial food chain is the most significant potential exposure pathway and /sup 137/Cs is the radionuclide responsible for most of the estimated dose over the next 50 y. The doses are calculated assuming a resettlement date of 1990. The average wholebody maximum annual estimated dose equivalent derived using our diet model is 166 mremy;the effective dose equivalent is 169 mremy. The estimated 30-, 50-, and 70-y integral whole-body dose equivalents are 3.5 rem, 5.1 rem, and 6.2 rem, respectively. Bone-marrow dose equivalents are only slightly higher than the whole-body estimates in each case. The bone-surface cells (endosteal cells) receive the highest dose, but they are a less sensitive cell population and are less sensitive to fatal cancer induction than whole body and bone marrow. The effective dose equivalents for 30, 50, and 70 y are 3.6 rem, 5.3 rem, and 6.6 rem, respectively. 79 refs., 17 figs., 24 tabs

  3. Waste minimization assessment procedure

    SciTech Connect (OSTI)

    Kellythorne, L.L. )

    1993-01-01

    Perry Nuclear Power Plant began developing a waste minimization plan early in 1991. In March of 1991 the plan was documented following a similar format to that described in the EPA Waste Minimization Opportunity Assessment Manual. Initial implementation involved obtaining management's commitment to support a waste minimization effort. The primary assessment goal was to identify all hazardous waste streams and to evaluate those streams for minimization opportunities. As implementation of the plan proceeded, non-hazardous waste streams routinely generated in large volumes were also evaluated for minimization opportunities. The next step included collection of process and facility data which would be useful in helping the facility accomplish its assessment goals. This paper describes the resources that were used and which were most valuable in identifying both the hazardous and non-hazardous waste streams that existed on site. For each material identified as a waste stream, additional information regarding the materials use, manufacturer, EPA hazardous waste number and DOT hazard class was also gathered. Once waste streams were evaluated for potential source reduction, recycling, re-use, re-sale, or burning for heat recovery, with disposal as the last viable alternative.

  4. Enterprise Assessments Operational Awareness Record for the Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    the Assessment of Construction at the Hanford Site K-West Annex Facility The purpose of this activity was to perform a quarterly assessment of the construction activities at the ...

  5. Enterprise Assessments Operational Awareness Record for the Assessment...

    Office of Environmental Management (EM)

    EA-HANFORD-2015-09-09 Site: Hanford Site Subject: Assessment of Construction at the ... quarterly assessment of the construction activities at the Hanford K-West Annex Facility. ...

  6. Enterprise Assessments Assessment of the Waste Isolation Pilot...

    Broader source: Energy.gov (indexed) [DOE]

    Assessment of the Fire Protection Program at the Waste Isolation Pilot Plant The U.S. ... a targeted assessment of the Waste Isolation Pilot Plant (WIPP) fire protection program. ...

  7. Enterprise Assessments Assessment of Construction Quality at the Hanford

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Waste Treatment and Immobilization Plant - June 2016 | Department of Energy at the Hanford Site Waste Treatment and Immobilization Plant - June 2016 Enterprise Assessments Assessment of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant - June 2016 June 2016 Assessment of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy (DOE)

  8. Enterprise Assessments Assessment of Selected Conduct of Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Processes at the Waste Isolation Pilot Plant - April 2016 | Department of Energy Selected Conduct of Operations Processes at the Waste Isolation Pilot Plant - April 2016 Enterprise Assessments Assessment of Selected Conduct of Operations Processes at the Waste Isolation Pilot Plant - April 2016 April 2016 Assessment of Selected Conduct of Operations Processes at the Waste Isolation Pilot Plant - April 2016 The U.S. Department of Energy's Office of Environment, Safety and Health Assessments,

  9. Energy Assessment Results: Most Commonly Identified Recommendations

    Broader source: Energy.gov [DOE]

    The Missouri Industrial Assessment Center shares its experience providing energy assessments to local industry.

  10. Tank farms hazards assessment

    SciTech Connect (OSTI)

    Broz, R.E.

    1994-09-30

    Hanford contractors are writing new facility specific emergency procedures in response to new and revised US Department of Energy (DOE) Orders on emergency preparedness. Emergency procedures are required for each Hanford facility that has the potential to exceed the criteria for the lowest level emergency, an Alert. The set includes: (1) a facility specific procedure on Recognition and Classification of Emergencies, (2) area procedures on Initial Emergency Response and, (3) an area procedure on Protective Action Guidance. The first steps in developing these procedures are to identify the hazards at each facility, identify the conditions that could release the hazardous material, and calculate the consequences of the releases. These steps are called a Hazards Assessment. The final product is a document that is similar in some respects to a Safety Analysis Report (SAR). The document could br produced in a month for a simple facility but could take much longer for a complex facility. Hanford has both types of facilities. A strategy has been adopted to permit completion of the first version of the new emergency procedures before all the facility hazards Assessments are complete. The procedures will initially be based on input from a task group for each facility. This strategy will but improved emergency procedures in place sooner and therefore enhance Hanford emergency preparedness. The purpose of this document is to summarize the applicable information contained within the Waste Tank Facility ``Interim Safety Basis Document, WHC-SD-WM-ISB-001`` as a resource, since the SARs covering Waste Tank Operations are not current in all cases. This hazards assessment serves to collect, organize, document and present the information utilized during the determination process.

  11. Appendix PA: Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Waste Isolation Pilot Plant Appendix PA-2014 Performance Assessment United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix PA Table of Contents PA-1.0 Introduction PA-1.1 Changes since the CRA-2009 PA PA-1.1.1 Replacement of Option D with the ROMPCS PA-1.1.2 Additional Mined Volume in the Repository North End PA-1.1.3 Refinement to the Probability of Encountering Pressurized Brine

  12. Model Fire Protection Assessment Guide

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Assessment guide covers the implementation of the DOE's responsibility of assuring that DOE and the DOE Contractors have established Fire Protection Programs that are at the level required for the area being assessed.

  13. Industrial Process Heating - Technology Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Process Heating - Technology Assessment 1 2 Contents 3 4 1. Introduction to the Technology/System ............................................................................................... 2 5 1.1. Industrial Process Heating Overview ............................................................................................ 2 6 2. Technology Assessment and Potential ................................................................................................. 6 7 2.1. Status

  14. Integrated Assessment | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontenttimes-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance...

  15. ORISE: Dose modeling and assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dose modeling and assessments The Oak Ridge Institute for Science and Education (ORISE) offers dose modeling and assessment services to demonstrate that federal and/or state regulatory compliance requirements are being met during the decontamination and decommissioning of nuclear facilities. Dose modeling is an important step in the assessment of safety and regulatory compliance, as well as the development of standards and regulatory rulemaking. The ultimate goal of dose modeling and assessments

  16. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  17. EA-0372: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Standards for Consumer Products: Refrigerators, Furnaces and Television Sets including Environmental Assessment Regulatory Impact Analysis

  18. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

  19. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

  20. Computer Security Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    1992-02-11

    LAVA/CS (LAVA for Computer Security) is an application of the Los Alamos Vulnerability Assessment (LAVA) methodology specific to computer and information security. The software serves as a generic tool for identifying vulnerabilities in computer and information security safeguards systems. Although it does not perform a full risk assessment, the results from its analysis may provide valuable insights into security problems. LAVA/CS assumes that the system is exposed to both natural and environmental hazards and tomore » deliberate malevolent actions by either insiders or outsiders. The user in the process of answering the LAVA/CS questionnaire identifies missing safeguards in 34 areas ranging from password management to personnel security and internal audit practices. Specific safeguards protecting a generic set of assets (or targets) from a generic set of threats (or adversaries) are considered. There are four generic assets: the facility, the organization''s environment; the hardware, all computer-related hardware; the software, the information in machine-readable form stored both on-line or on transportable media; and the documents and displays, the information in human-readable form stored as hard-copy materials (manuals, reports, listings in full-size or microform), film, and screen displays. Two generic threats are considered: natural and environmental hazards, storms, fires, power abnormalities, water and accidental maintenance damage; and on-site human threats, both intentional and accidental acts attributable to a perpetrator on the facility''s premises.« less

  1. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    SciTech Connect (OSTI)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  2. NATURAL RESOURCES ASSESSMENT

    SciTech Connect (OSTI)

    D.F. Fenster

    2000-12-11

    The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology

  3. A framework for combining social impact assessment and risk assessment

    SciTech Connect (OSTI)

    Mahmoudi, Hossein; Environmental Sciences Research Institute, Shahid Beheshti University, G.C. ; Renn, Ortwin; Vanclay, Frank; Hoffmann, Volker; Karami, Ezatollah

    2013-11-15

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  4. Ozone Risk Assessment Utilities

    Energy Science and Technology Software Center (OSTI)

    1999-08-10

    ORAMUS is a user-friendly, menu-driven software system that calculates and displays user-selected risk estimates for health effects attributable to short-term exposure to tropospheric ozone. Inputs to the risk assessment are estimates of exposure to ozone and exposure-response relationships to produce overall risk estimates in the form of probability distributions. Three fundamental models are included: headcount risk, benchmark risk, and hospital admissions. Exposure-response relationships are based on results of controlled human exposure studies. Exposure estimates aremore » based on the EPA''s probabilistic national ambient air quality standards (NAAQS) exposure model, pNEM/Osub3, which simulates air quality associated with attainment of alternative NAAQS. Using ORAMUS, risk results for 27 air quality scenarios, air quality in 9 urban areas, 33 health endpoints, and 4 chronic health endpoints can be calculated.« less

  5. Biosafety Risk Assessment Model

    Energy Science and Technology Software Center (OSTI)

    2011-05-27

    Software tool based on a structured methodology for conducting laboratory biosafety risk assessments by biosafety experts. Software is based upon an MCDA scheme and uses peer reviewed criteria and weights. The software was developed upon Microsoft’s .net framework. The methodology defines likelihood and consequence of a laboratory exposure for thirteen unique scenarios and provides numerical relative risks for each of the relevant thirteen. The software produces 2-d graphs reflecting the relative risk and a sensitivitymore » analysis which highlights the overall importance of each factor. The software works as a set of questions with absolute scales and uses a weighted additive model to calculate the likelihood and consequence.« less

  6. Supporting analyses and assessments

    SciTech Connect (OSTI)

    Ohi, J.

    1995-09-01

    Supporting analysis and assessments can provide a sound analytic foundation and focus for program planning, evaluation, and coordination, particularly if issues of hydrogen production, distribution, storage, safety, and infrastructure can be analyzed in a comprehensive and systematic manner. The overall purpose of this activity is to coordinate all key analytic tasks-such as technology and market status, opportunities, and trends; environmental costs and benefits; and regulatory constraints and opportunities-within a long-term and systematic analytic foundation for program planning and evaluation. Within this context, the purpose of the project is to help develop and evaluate programmatic pathway options that incorporate near and mid-term strategies to achieve the long-term goals of the Hydrogen Program. In FY 95, NREL will develop a comprehensive effort with industry, state and local agencies, and other federal agencies to identify and evaluate programmatic pathway options to achieve the long-term goals of the Program. Activity to date is reported.

  7. Minority energy assessment report

    SciTech Connect (OSTI)

    Teotia, A.P.S.; Poyer, D.A.; Lampley, L.; Anderson, J.L.

    1992-12-01

    The purpose of this research is to project household energy consumption, energy expenditure, and energy expenditure as share of income for five population groups from 1991 to 2009. The approach uses the Minority Energy Assessment Model (MEAM), developed by Argonne National Laboratory for the US Department of Energy's Office of Minority Economic Impact. The MEAM provides a framework that can be used to forecast regional energy consumption and energy expenditure for majority, black, Hispanic, poor, and nonpoor households. The forecasts of key macroeconomic and energy variables used as exogenous variables in the MEAM were obtained from the Data Resources, Inc., Macromodel and Energy Model. Generally, the projections of household energy consumption, expenditure, and energy expenditure as share of income vary across population groups and census regions.

  8. Cassini data assessment report

    SciTech Connect (OSTI)

    1998-08-01

    On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

  9. Enterprise Assessments Assessment of Construction Quality and the Fire

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection program at the Hanford Site Waste Treatment and Immobilization Plant - April 2016 | Department of Energy and the Fire Protection program at the Hanford Site Waste Treatment and Immobilization Plant - April 2016 Enterprise Assessments Assessment of Construction Quality and the Fire Protection program at the Hanford Site Waste Treatment and Immobilization Plant - April 2016 April 2016 Assessment of Construction Quality and the Fire Protection program at the Hanford Site Waste

  10. Enterprise Assessments Targeted Assessment of the Waste Treatment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Immobilization Plant High-Level Waste Facility Radioactive Liquid Waste Disposal System Safety Basis Change Package - May 2016 | Department of Energy Assessment of the Waste Treatment and Immobilization Plant High-Level Waste Facility Radioactive Liquid Waste Disposal System Safety Basis Change Package - May 2016 Enterprise Assessments Targeted Assessment of the Waste Treatment and Immobilization Plant High-Level Waste Facility Radioactive Liquid Waste Disposal System Safety Basis Change

  11. Enterprise Assessments Assessment of Selected Conduct of Operations...

    Office of Environmental Management (EM)

    Assessment of Selected Conduct of Operations Processes at the Waste Isolation Pilot Plant ... Manager LOTO LockoutTagout NWP Nuclear Waste Partnership, LLC OFI Opportunity for ...

  12. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Office of Environmental Management (EM)

    Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant June 2016 Office ... Nuclear Safety Organization NWP Nuclear Waste Partnership, LLC NMMP Nuclear Maintenance ...

  13. Enterprise Assessments Targeted Assessment of the Waste Treatment...

    Office of Environmental Management (EM)

    Assessment of the Waste Treatment and Immobilization Plant High-Level Waste Facility Radioactive Liquid Waste Disposal System Safety Basis Change Package - May 2016 Enterprise ...

  14. TEPP Planning Products Model Needs Assessment Self Assessment Document

    Office of Environmental Management (EM)

    Planning Products Model Needs Assessment Self Assessment Document Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-13.p65 1 Model Needs Assessment R E V 8 - 0 7 / 2 0 1 2 T r a n s p o r t a t i o n E m e r g e n c y P r e p a r e d n e s s P r o g r a m PURPOSE The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident involving

  15. Enterprise Assessments Targeted Assessment of the Waste Treatment...

    Office of Environmental Management (EM)

    Targeted Assessment of the Waste Treatment and Immobilization Plant High-Level Waste Facility Radioactive Liquid Waste Disposal System Safety Basis Change Package May 2016 Office ...

  16. Enterprise Assessments Assessment of the Y-12 National Security...

    Energy Savers [EERE]

    Y-12 National Security Complex Criticality Accident Alarm System June 2016 Office of Nuclear Safety and Environmental Assessments ... CAAS Configuration Management ...

  17. Enterprise Assessments Operational Awareness Record for the Assessment...

    Energy Savers [EERE]

    the Lawrence Livermore National Laboratory Transuranic Waste Inventory Tracking System, ... for the Assessment of the Lawrence Livermore National Laboratory Transuranic Waste ...

  18. Hanford Construction Workers Needs Assessment | Department of...

    Energy Savers [EERE]

    Construction Workers Needs Assessment Hanford Construction Workers Needs Assessment October 1997 This Needs Assessment for former Hanford construction workers was developed for the ...

  19. Industrial Assessment Centers Update, March 2015 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Read the Industrial Assessment Centers (IAC) Update -- March 2015 Industrial Assessment Centers Quarterly Update, March 2015 More Documents & Publications Industrial Assessment...

  20. PHEV Battery Cost Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    es_02_barnett.pdf (615.99 KB) More Documents & Publications PHEV Battery Cost Assessment PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment

  1. Environmental Assessment Checklist (DOE, 1994) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist (DOE, 1994) Environmental Assessment Checklist (DOE, 1994) A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist ...

  2. Environmental Assessment Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist Environmental Assessment Checklist A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist More Documents &...

  3. Climate Change Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Change Assessment Climate Change Assessment Climate Change Assessment 66climornlsalev2mjs.ppt (11.1 MB) More Documents & Publications 2014 Water Power Program Peer ...

  4. Enterprise Assessments, Lessons Learned from Targeted Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enterprise Assessments (EA), Office of Environment, Safety and Health Assessments, ... hazard analysis and implementation of work controls) as a targeted assessment area ...

  5. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Silver Peak Area Geothermal Exploration Project Environmental Assessment, Esmeralda County, NV December 12, 2012 EA-1919: Draft Programmatic Environmental Assessment...

  6. Energy Assessment Results: Most Commonly Identified Recommendations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Assessment Results: Most Commonly Identified Recommendations The Missouri Industrial Assessment Center shares its experience providing energy assessments to local industry. ...

  7. Los Alamos Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos Needs Assessment Los Alamos Needs Assessment February 1999 This Needs Assessment for former Los Alamos National Laboratory workers was developed for the purpose of ...

  8. Independent Oversight Assessment, Pantex Plant - November 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant This report provides the results of an independent assessment of...

  9. AVLIS Criticality risk assessment

    SciTech Connect (OSTI)

    Brereton, S.J., LLNL

    1998-04-29

    U-235 and uranium depleted in U-235) are cooled and accumulated in solid metallic form in canisters. The collected product and tails material is weighed and transferred into certified, critically safe, shipping containers (DOT specification 6M with 2R containment vessel). These will be temporarily stored, and then shipped offsite either for use by a fuel fabricator, or for disposal. Tails material will be packaged for disposal. A criticality risk assessment was performed for AVLIS IPD runs. In this analysis, the likelihood of occurrence of a criticality was examined. For the AVLIS process, there are a number of areas that have been specifically examined to assess whether or not the frequency of occurrence of a criticality is credible (frequency of occurrence > 10-6/yr). In this paper, we discuss only two of the areas: the separator and canister operations.

  10. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  11. Fiscal Year 2014 Revegetation Assessment

    SciTech Connect (OSTI)

    Nordstrom, Jenifer

    2015-03-01

    This report summarizes the Fiscal Year 2014 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to document revegetation efforts at Idaho National Laboratory to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Five disturbed sites were evaluated for this assessment. Four sites are recommended to be removed from the annual assessment, and one is recommended for continued evaluation. New sites are also identified for future monitoring as part of the annual assessment.

  12. Remedial Action Assessment System

    Energy Science and Technology Software Center (OSTI)

    1997-02-01

    RAAS1.1 is a software-based system designed to assist remediation professionals at each stage of the environmental analysis process. RAAS1.1 provides a template for environmental restoration analysis, and provides the user with key results at each step in the analysis. RAAS1.1 assists the user to develop a coherent and consistent site description, estimate baseline and residual risk to public health from the contaminated site, identify applicable environmental restoration technologies, and formulate feasible remedial response alternatives. Inmore » addition, the RAAS1.1 methodology allows the user to then assess and compare those remedial response alternatives across EPA criteria, including: compliance with objectives; short-term and long-term effectiveness; extent of treatment; and implementability of the technologies. The analytic methodology is segmented and presented in a standardized, concise, easy-to-use format that can be viewed on the personal computer screen, saved and further manipulated, or printed for later use. Each screen and analytic step is accessed via a user-friendly personal computer graphical interface. Intuitively-designed buttons, menus, and lists help the user focus in on the particular information and analysis component of interest; the corresponding results are presented in a format that facilitates their use in decision-making.« less

  13. Information technology resources assessment

    SciTech Connect (OSTI)

    Loken, S.C.

    1993-01-01

    The emphasis in Information Technology (IT) development has shifted from technology management to information management, and the tools of information management are increasingly at the disposal of end-users, people who deal with information. Moreover, the interactive capabilities of technologies such as hypertext, scientific visualization, virtual reality, video conferencing, and even database management systems have placed in the hands of users a significant amount of discretion over how these resources will be used. The emergence of high-performance networks, as well as network operating systems, improved interoperability, and platform independence of applications will eliminate technical barriers to the use of data, increase the power and range of resources that can be used cooperatively, and open up a wealth of possibilities for new applications. The very scope of these prospects for the immediate future is a problem for the IT planner or administrator. Technology procurement and implementation, integration of new technologies into the existing infrastructure, cost recovery and usage of networks and networked resources, training issues, and security concerns such as data protection and access to experiments are just some of the issues that need to be considered in the emerging IT environment. As managers we must use technology to improve competitiveness. When procuring new systems, we must take advantage of scalable resources. New resources such as distributed file systems can improve access to and efficiency of existing operating systems. In addition, we must assess opportunities to improve information worker productivity and information management through tedmologies such as distributed computational visualization and teleseminar applications.

  14. FTCP Assessment Guidance and Criteria

    Broader source: Energy.gov [DOE]

    This document establishes the guidance and criteria for conducting internal and independent Federal Technical Capability Assessments within the Department. The requirements of this document are applicable to those organizations having safety responsibilities for defense nuclear facilities. This includes both headquarters and field organizations. Regardless of the type of assessment conducted, the objectives and criteria within this document are used as a basis for the assessment. Use of consistent objectives and criteria is necessary to establish baselines and to track and trend performance.

  15. TECHNOLOGY READINESS ASSESSMENT-OVERVIEW

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASSESSMENT-OVERVIEW JANUARY 2015 -A CHECKPOINT ALONG A CHALLENGING JOURNEY DOE/NETL-2015/1711 U.S. Department of Energy 2014 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2 2014 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW Office of Fossil Energy | National Energy Technology Laboratory DISCLAIMER 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes

  16. INDUSTRIAL ASSESSMENT CENTERS: IAC Update

    Broader source: Energy.gov (indexed) [DOE]

    reducing waste and water, and increasing productivity through immediate changes in manufacturing processes and equipment. Since 2006, IAC assessments have identified more...

  17. EA-1956: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

  18. Management and Independent Assessments Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-27

    The Guide reflects updated standards for assessment practices, international standards, and changes in DOE expectations related to quality assurance (QA). Supersedes DOE G 414.1-1B.

  19. 2011 Annual IC Assessment Report

    Office of Legacy Management (LM)

    left blank U.S. Department of Energy Annual Assessment of the Effectiveness of ... of Sitewide Institutional Controls, Mound Site U.S. Department of Energy Doc. No. ...

  20. ORISE: Radiological program assessment services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORISE focuses its radiological audit and assessment services in these key areas: Nondestructive assay (NDA) Radiological control programs Environmental monitoring programs ...

  1. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 20, 2015 Enterprise Assessments Review of the Argonne National Laboratory Fire Protection Program - August 2015 Review of the Argonne National Laboratory Fire...

  2. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Immobilization Plant Construction Quality August 15, 2013 Independent Oversight Activity Report, Hanford Tank Farms - June 2013 Office of River Protection Assessment of...

  3. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Salt Waste Processing Facility Project - January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project January 18, 2013 Independent...

  4. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sodium Bearing Waste Treatment Project - November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project October 31,...

  5. Exploration Technologies Technology Needs Assessment

    Broader source: Energy.gov [DOE]

    The Exploration Technologies Needs Assessment is a critical component of ongoing technology roadmapping efforts, and will be used to guide the program's research and development.

  6. Assessment Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Analysis April 10, 2015 Enterprise Assessments Review, Pantex Plant 2014 Full Participation Exercise - April 2015 Review of the Pantex Plant 2014 Full Participation...

  7. ORISE: Dose modeling and assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Oak Ridge Institute for Science and Education (ORISE) offers dose modeling and assessment services to demonstrate that federal andor state regulatory compliance requirements...

  8. Exploration Technologies - Technology Needs Assessment

    SciTech Connect (OSTI)

    Greene, Amanda I.; Thorsteinsson, Hildigunnur; Reinhardt, Tim; Solomon, Samantha; James, Mallory

    2011-06-01

    This assessment is a critical component of ongoing technology roadmapping efforts, and will be used to guide the Geothermal Technology Program's research and development.

  9. CRAD, Operations Authorization Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project.

  10. 2011 Annual IC Assessment Report

    Office of Legacy Management (LM)

    ... cap. ...... 17 U.S. Department of Energy Annual Assessment of the Effectiveness of ......... 18 Figure 29. Green flags near offsite groundwater monitoring ...

  11. RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT

    SciTech Connect (OSTI)

    Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

    2012-03-31

    Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of

  12. EA-1835: Environmental Assessment Determination | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35: Environmental Assessment Determination EA-1835: Environmental Assessment Determination Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project ...

  13. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness Record, Waste ...

  14. Solar Radiation Empirical Quality Assessment

    Energy Science and Technology Software Center (OSTI)

    1994-03-01

    The SERIQC1 subroutine performs quality assessment of one, two, or three-component solar radiation data (global horizontal, direct normal, and diffuse horizontal) obtained from one-minute to one-hour integrations. Included in the package is the QCFIT tool to derive expected values from historical data, and the SERIQC1 subroutine to assess the quality of measurement data.

  15. Training Needs Assessment (TNA) Presentation

    Broader source: Energy.gov [DOE]

    The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's participate in the DOE training needs assessment (TNA). This presentation goes over how the training needs assessment (TNA) is done and the components of the TNA data collection tool.

  16. TMCC WIND RESOURCE ASSESSMENT

    SciTech Connect (OSTI)

    Turtle Mountain Community College

    2003-12-30

    North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate

  17. Enterprise Assessments Operational Awareness Record for the Assessment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction at the Hanford Site K-West Annex Facility (OAR EA-HANFORD-2015-09-09) | Department of Energy Construction at the Hanford Site K-West Annex Facility (OAR EA-HANFORD-2015-09-09) Enterprise Assessments Operational Awareness Record for the Assessment of Construction at the Hanford Site K-West Annex Facility (OAR EA-HANFORD-2015-09-09) February 2016 Operational Awareness Record for the Assessment of Construction at the Hanford Site K-West Annex Facility The purpose of this activity

  18. Enterprise Assessments Operational Awareness Record for the Assessment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conduct of Operations in Control Rooms at the Savannah River Site, April 19-20, 2016 (OAR EA-SRS-2016-04-19) | Department of Energy Conduct of Operations in Control Rooms at the Savannah River Site, April 19-20, 2016 (OAR EA-SRS-2016-04-19) Enterprise Assessments Operational Awareness Record for the Assessment of Conduct of Operations in Control Rooms at the Savannah River Site, April 19-20, 2016 (OAR EA-SRS-2016-04-19) July 2016 Operational Awareness Record for the Assessment of Conduct of

  19. Enterprise Assessments Operational Awareness Record for the Assessment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Review of Past Findings at the Waste Isolation Pilot Plant, May 17 - 19, 2016 (OAR # EA-WIPP-2016-05-17) | Department of Energy the Review of Past Findings at the Waste Isolation Pilot Plant, May 17 - 19, 2016 (OAR # EA-WIPP-2016-05-17) Enterprise Assessments Operational Awareness Record for the Assessment of the Review of Past Findings at the Waste Isolation Pilot Plant, May 17 - 19, 2016 (OAR # EA-WIPP-2016-05-17) August 2016 Operational Awareness Record for the Assessment of the

  20. Viability Assessment Volume 4

    SciTech Connect (OSTI)

    DOE

    1998-12-01

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a

  1. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  2. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  3. TEPP Model Needs Assessment Document

    Broader source: Energy.gov [DOE]

    The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident  involving...

  4. Fort Carson Wind Resource Assessment

    SciTech Connect (OSTI)

    Robichaud, R.

    2012-10-01

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  5. E-Area Performance Assessment

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015.

  6. Interactive Rapid Dose Assessment Model.

    Energy Science and Technology Software Center (OSTI)

    1988-10-31

    IRDAM is a micro-computer based program for rapidly assessing the radiological impact of an accident at a nuclear power plant. The code packaged October 1988 is Version 3.

  7. Property Assessed Clean Energy Financing

    Broader source: Energy.gov [DOE]

    The District of Columbia offers a commercial Property Assessed Clean Energy (PACE) program. PACE financing allows commercial and mulitfamily property owners in the district to borrow money to pay...

  8. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  9. Fan System Assessment Tool (FSAT)

    Broader source: Energy.gov [DOE]

    The Fan System Assessment Tool (FSAT) is a free online software tool that helps industrial users quantify energy use and savings opportunities in industrial fan systems. Use FSAT to understand how...

  10. Renewable Energy Property Tax Assessment

    Broader source: Energy.gov [DOE]

    Solar photovoltaic (PV) and wind energy facilities with a capacity of 2 megawatts (MW) AC or less are assessed locally for property taxes. Additionally, low impact hydro, geothermal, and biomass...

  11. CRAD, Confined Spaces Assessment Plan

    Broader source: Energy.gov [DOE]

    This assessment provides a basis for evaluating the safety effectiveness of the contractor’s confined or enclosed spaces procedure, and for establishing compliance with DOE and OSHA requirements.

  12. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  13. Fan System Assessment Tool Introduction

    Broader source: Energy.gov [DOE]

    This presentation provides an introduction to the Fan System Assessment Tool (FSAT). With FSAT, users can calculate the amount of energy used by their fan system; determine system efficiency; and quantify the savings potential of an upgraded system.

  14. Demand Response Quick Assessment Tool

    Energy Science and Technology Software Center (OSTI)

    2008-12-01

    DRQAT (Demand Response Quick Assessment Tool) is the tool for assessing demand response saving potentials for large commercial buildings. This tool is based on EnergyPlus simulations of prototypical buildings and HVAC equipment. The opportunities for demand reduction and cost savings with building demand responsive controls vary tremendously with building type and location. The assessment tools will predict the energy and demand savings, the economic savings, and the thermal comfor impact for various demand responsive strategies.more » Users of the tools will be asked to enter the basic building information such as types, square footage, building envelope, orientation, utility schedule, etc. The assessment tools will then use the prototypical simulation models to calculate the energy and demand reduction potential under certain demand responsive strategies, such as precooling, zonal temperature set up, and chilled water loop and air loop set points adjustment.« less

  15. EA-1778: Draft Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    [Draft] Environmental Assessment for the [Supplemental] Proposed Rule, 10 CFR Part 433 and 10 CFR Part 435, “Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings"

  16. Environmental Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments Environmental Assessments The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO's due diligence process for issuing a Department of Energy loan or loan guarantee. With the exception of a Record of Decision, the posting of these documents should not be construed as recommending a decision about the issuance of a loan or loan guarantee. Documents Available for Download November 6,

  17. PRIVACY IMPACT ASSESSMENT: INL Communications

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications and Public Affairs Tour Tracker PIA Template Version 3 - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for reqUirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may

  18. Guam Initial Technical Assessment Report

    SciTech Connect (OSTI)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  19. Risk assessment in international operations

    SciTech Connect (OSTI)

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  20. Wave Energy Resource Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wave Energy Resource Assessment Wave Energy Resource Assessment Wave Energy Resource Assessment 52_wave_resource_assessment_epri_jacobson.ppt (308.5 KB) More Documents & Publications OTEC resource assessment OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation (OPPSDIV) Whitestone Power & Communications (TRL 1 2 3 System) - Whitestone Poncelet RISEC Project

  1. Agenda: Preliminary Assessment Development Teleconference | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Agenda: Preliminary Assessment Development Teleconference Agenda: Preliminary Assessment Development Teleconference Document serves as a standard agenda for the teleconference to discuss the in-progress preliminary assessment. Download the Preliminary Assessment Development Teleconference Agenda. (57.93 KB) More Documents & Publications FEMP ESPC Project Development Resource Guide Agenda: Preliminary Assessment Kickoff Meeting Agenda: Investment-Grade Audit Midpoint Review Meeting

  2. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  3. System Assessment Standards: Defining the Market for Industrial Energy Assessments

    SciTech Connect (OSTI)

    Sheaffer, Paul; McKane, Aimee; Tutterow, Vestal; Crane, Ryan

    2009-08-01

    Improved efficiency of industrial systems (e.g., compressed air or steam) contributes to a manufacturing facility?s bottom line, improves reliability, and better utilizes assets. Despite these advantages, many industrial facilities continue to have unrealized system optimization potential. A barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services, creating problems for both service providers in establishing market value for their services and for consumers in determining the relative quality of these system assessment services. On August 19, 2008, the American Society of Mechanical Engineers (ASME) issued four new draft Standards for trial use that are designed to raise the bar and define the market for these services. These draft Standards set the requirements for conducting an energy assessment at an industrial facility for four different system types: compressed air, process heating, pumping, and steam. The Standards address topics such as organizing and conducting assessments; analyzing the data collected; and reporting and documentation. This paper addresses both the issues and challenges in developing the Standards and the accompanying Guidance Documents, as well as the result of field testing by industrial facilities, consultants, and utilities during the trial use period that ended in January, 2009. These Standards will be revised and released by ASME for public review, and subsequently submitted for approval as American National Standards for publication in late 2009. Plans for a related activity to establish a professional-level program to certify practitioners in the area of system assessments, opportunities to integrate the ASME Standards with related work on industrial energy efficiency, as well as plans to expand the system assessment Standard portfolio are also discussed.

  4. Enterprise Assessments Operational Awareness Record for the Assessment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Lawrence Livermore National Laboratory Transuranic Waste Inventory Tracking System, March 14-18, 2016 (OAR EA-LLNL-2016-03-14) | Department of Energy the Lawrence Livermore National Laboratory Transuranic Waste Inventory Tracking System, March 14-18, 2016 (OAR EA-LLNL-2016-03-14) Enterprise Assessments Operational Awareness Record for the Assessment of the Lawrence Livermore National Laboratory Transuranic Waste Inventory Tracking System, March 14-18, 2016 (OAR EA-LLNL-2016-03-14) June

  5. Emergency Response Capability Baseline Needs Assessment Compliance Assessment

    SciTech Connect (OSTI)

    Sharry, John A.

    2013-09-16

    This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures.

  6. Enterprise Assessments Lessons Learned from the 2015 Emergency Management Assessments … May 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned from the 2015 Emergency Management Assessments May 2016 Office of Emergency Management Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ..................................................................................................................................................... ii Executive Summary

  7. Qualitative methods for assessing risk

    SciTech Connect (OSTI)

    Mahn, J.A.; Hannaman, G.W.; Kryska, P.

    1995-04-01

    The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

  8. NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop

    SciTech Connect (OSTI)

    Renne, D.

    2008-10-29

    Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

  9. Crucial Habitat Assessment Tool | Open Energy Information

    Open Energy Info (EERE)

    library Web Site: Crucial Habitat Assessment Tool Abstract The Western Association of Fish and Wildlife Agencies Crucial Habitat Assessment Tool (CHAT) was developed to bring...

  10. Risk Assessment Technical Experts Working Group

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Experts Working Group (RWG) was established to assist DOE in the appropriate and effective use of quantitative risk assessment in nuclear safety related activities.

  11. Building Energy Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    Opportunities 3b.1. Assess technical potential for sector technologies Renewable Energy Technical Potential Toolkit Building Energy Assessment Toolkit Power System Screening...

  12. Impact Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    Opportunities 3b.1. Assess technical potential for sector technologies Renewable Energy Technical Potential Toolkit Building Energy Assessment Toolkit Power System Screening...

  13. Australia - Energy Resource Assessment | Open Energy Information

    Open Energy Info (EERE)

    - Energy Resource Assessment Jump to: navigation, search Name Australia - Energy Resource Assessment AgencyCompany Organization Australian Government Sector Energy Focus Area...

  14. Colorado's Hydrothermal Resource Base - An Assessment | Open...

    Open Energy Info (EERE)

    Hydrothermal Resource Base - An Assessment Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Colorado's Hydrothermal Resource Base - An Assessment Author...

  15. Enterprise Assessments Review, Sandia National Laboratories ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments (EA), Office of Environment, Safety ...

  16. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, 2005) The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, ...

  17. Nevada National Security Site Performance Assessment Updates...

    Office of Environmental Management (EM)

    Performance Assessment Updates for New Waste Streams Nevada National Security Site ... Video Presentation Nevada National Security Site Performance Assessment Updates for New ...

  18. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado October 20, 2011 EA-1665: Final Environmental Assessment and...

  19. Tribal Renewable Energy Foundational Course: Assessing Energy...

    Energy Savers [EERE]

    Assessing Energy Needs and Resources Tribal Renewable Energy Foundational Course: Assessing Energy Needs and Resources Watch the U.S. Department of Energy Office of Indian Energy ...

  20. Idaho DEQ Environmental Assessment Information | Open Energy...

    Open Energy Info (EERE)

    Assessment Information Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho DEQ Environmental Assessment Information Abstract This website provides an...

  1. Technical Position, Regarding Acceptable Methods for Assessing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regarding Acceptable Methods for Assessing and Recording Radiation Doses to Individuals Technical Position, Regarding Acceptable Methods for Assessing and Recording Radiation Doses...

  2. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide ...

  3. Enterprise Assessments Operational Awareness Record of Observations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enterprise Assessments Operational Awareness Record of Observations of the Design and ... March 2016 Enterprise Assessments Operational Awareness Record of Observations of the ...

  4. Paducah Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Paducah Needs Assessment May 2003 This Needs Assessment for former Paducah Gaseous Diffusion Plant construction workers was developed for the purpose of collecting existing...

  5. EA-1913: Preliminary Environmental Assessment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Preliminary Environmental Assessment EA-1913: Preliminary Environmental Assessment Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho This EA evaluates the ...

  6. Technology Readiness Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Management Tank Waste and Waste Processing Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download August 1, 2013 Technology ...

  7. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the ...

  8. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER...

    Office of Scientific and Technical Information (OSTI)

    INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ... Title: INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE ...

  9. Environmental Impact Statements and Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the ...

  10. Retrofit Integrated Space & Water Heating: Field Assessment,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retrofit Integrated Space and Water Heating: Field Assessment Minneapolis, Minnesota PROJECT INFORMATION Project Name: Retrofit Integrated Space and Water Heating: Field Assessment ...

  11. Assessment B - Program Criteria | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B - Program Criteria Assessment B - Program Criteria Microsoft Word - Assessment-B-ProgramCriteria (218.66 KB) More Documents & Publications ATTACHMENT A - CHECKLIST FOR SELF ...

  12. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 21, 2014 EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon March 11, 2014 EA-1956: Draft Site-Wide Environmental Assessment...

  13. Weapons assessment efficiencies through use of nondestructive...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Weapons assessment efficiencies through use of nondestructive laser gas sampling Weapons assessment efficiencies through use of nondestructive laser gas sampling Nondestructive ...

  14. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment Sauk Valley Community College's Wind Energy Project, Dixon, Lee County, Illinois December 1, 2010 EA-1807: Final Environmental Assessment Heartland...

  15. Agenda: Preliminary Assessment Kickoff Meeting | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Document serves as the standard agenda for the preliminary assessment kickoff meeting. File Download the Preliminary Assessment Kickoff Meeting Agenda. More Documents & ...

  16. Technical Assessment Team Issues Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2015 Technical Assessment Team Issues Final Report This week the Department of Energy's Technical Assessment Team (TAT) visited Carlsbad and met with federal and contractor staff ...

  17. Qualified Specialists in Industrial Assessment Tools | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Qualified Specialists in Industrial Assessment Tools Qualified Specialists in Industrial Assessment Tools Locate a DOE-trained Qualified Specialist in your area to identify ways to...

  18. Performance Assessment and Composit Analysis Material Disposal...

    Office of Environmental Management (EM)

    Performance Assessment and Composit Analysis Material Disposal Area G Revision 4 Performance Assessment and Composit Analysis Material Disposal Area G Revision 4 Los Alamos...

  19. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment Silver Peak Area Geothermal Exploration Project, Esmeralda County, NV October 1, 2012 EA-1863: Final Environmental Assessment Vegetation...

  20. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Campbell County Wind Farm, Campbell County, South Dakota July 9, 2014 EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho...

  1. Innovative Exploration Techniques for Geothermal Assessment at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration ...

  2. Technology Roadmap Analysis 2013: Assessing Automotive Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roadmap Analysis 2013: Assessing Automotive Technology R&D Relevant to DOE Power Electronics Cost Targets Technology Roadmap Analysis 2013: Assessing Automotive Technology R&D ...

  3. Enterprise Assessments Lessons Learned from Targeted Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    organizational learning. Enterprise Assessments Lessons Learned from Targeted Reviews of the Management of Safety ... Office - March 2012 Safety System Oversight Assessment, Los ...

  4. ASCEM Software Capabilities and Performance Assessment Deployments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ASCEM Software Capabilities and Performance Assessment Deployments Greg Flach ASCEM Site Applications Team Performance & Risk Assessment Community of Practice Technical Exchange ...

  5. Cyber Assessment Methods for SCADA Security

    Office of Energy Efficiency and Renewable Energy (EERE)

    This paper describes vulnerability assessment methodologies used in ongoing research and assessment activities designed to identify and resolve vulnerabilities so as to improve the security of the...

  6. Lead-based paint assessment

    SciTech Connect (OSTI)

    Lorie, C.; Cowdery, J.W.

    1994-12-31

    In 1977, The US consumer product safety commission banned the use of lead-based paint (LBP) in all industries, except the maritime industry which still has certain privileged uses. Unfortunately for property and building owners, the ban did not come soon enough. In response to this heightened awareness, several environmental market sectors addressing the issues have emerged. These include: residential; soil; commercial; water; and structures. The first and most important step in addressing the concerns posed by the existence of lead based contamination is to quantify the amount of lead-based product, to determine the location of the lead based product and the extent, if any, of lead based contamination, and to make recommendations for the remediation or abatement of the lead product and resultant contamination. In narrowing the focus of these issues, this paper discusses lead-based paint assessment; preparing and organizing the assessment, the regulatory considerations, assessment methodology, and presentation of results.

  7. A total risk assessment methodology for security assessment.

    SciTech Connect (OSTI)

    Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-06-01

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a

  8. Technology assessment of RDX production

    SciTech Connect (OSTI)

    Coburn, M.D.

    1995-04-01

    The known processes for producing RDX were assessed with the goal of identifying the process that would generate the least waste and pollution. It was concluded that the Bachman process employed at Holston AAP is the most economical process for producing RDX and that it probably produces less waste than any other process. It was generally agreed that the entire Holston operation is a very clean one that complies with all federal and state emission standards. In addition, a number of opportunities in which Holston could reduce their wastes were identified. Preliminary assessments of waste and pollution profiles for alternate materials, with emphasis on dual-use materials, were performed.

  9. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmoreJavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Serverless

  10. Adaptive capacity and its assessment

    SciTech Connect (OSTI)

    Engle, Nathan L.

    2011-04-20

    This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

  11. Health impact assessment in Korea

    SciTech Connect (OSTI)

    Kang, Eunjeong; Lee, Youngsoo; Harris, Patrick; Koh, Kwangwook; Kim, Keonyeop

    2011-07-15

    Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

  12. Assessment & Commitment Tracking System (ACTS)

    Energy Science and Technology Software Center (OSTI)

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTMLmore » JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server« less

  13. Assessment & Commitment Tracking System (ACTS)

    SciTech Connect (OSTI)

    Bryant, Robert A.; Childs, Teresa A.; Miller, Michael A.; Sellars, Kevin J.

    2004-12-20

    The ACTS computer code provides a centralized tool for planning and scheduling assessments, tracking and managing actions associated with assessments or that result from an event or condition, and "mining" data for reporting and analyzing information for improving performance. The ACTS application is designed to work with the MS SQL database management system. All database interfaces are written in SQL. The following software is used to develop and support the ACTS application: Cold Fusion HTML JavaScript Quest TOAD Microsoft Visual Source Safe (VSS) HTML Mailer for sending email Microsoft SQL Microsoft Internet Information Server

  14. Assessing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    dental disease in minutes Understanding climate change Keeping watch on the world SPRING 2007 S A N D I A T E C H N O L O G Y A Q UA RT E R LY R E S E A R C H & D E V E LO P M E N T MAG A Z I N E - VO LUM E 9 , N O. 1 Sandia Technology (ISSN: 1547-5190) is a quarterly maga- zine published by Sandia National Laboratories. Sandia is a multiprogram engineering and science laboratory operated by Sandia Corporation, a Lockheed Martin company, for the Department of Energy. With main facilities in

  15. Integrated Disposal Facility Risk Assessment

    SciTech Connect (OSTI)

    MANN, F. M.

    2003-06-03

    An environmental risk assessment associated with the disposal of projected Immobilized Low-Activity Waste, solid wastes and failed or decommissioned melters in an Integrated Disposal Facility was performed. Based on the analyses all performance objectives associated with the groundwater, air, and intruder pathways were met.

  16. Guide to Home Energy Assessments

    SciTech Connect (OSTI)

    2011-02-01

    A proper home energy assessment (also called a home energy audit) will tell you how much energy you use in your house, the most cost-effective measures you can take to improve the energy efficiency of your home, and how to save money on energy bills.

  17. The risk assessment information system

    SciTech Connect (OSTI)

    Kerr, S.B.; Bonczek, R.R.; McGinn, C.W.; Land, M.L.; Bloom, L.D.; Sample, B.E.; Dolislager, F.G.

    1998-06-01

    In an effort to provide service-oriented environmental risk assessment expertise, the Department of Energy (DOE) Center for Risk Excellence (CRE) and DOE Oak Ridge Operations Office (ORO) are sponsoring Oak Ridge National Laboratory (ORNL) to develop a web-based system for disseminating risk tools and information to its users. This system, the Risk Assessment Information System (RAIS), was initially developed to support the site-specific needs of the DOE-ORO Environmental Restoration Risk Assessment Program. With support from the CRE, the system is currently being expanded to benefit all DOE risk information users and can be tailored to meet site-specific needs. Taking advantage of searchable and executable databases, menu-driven queries, and data downloads, using the latest World Wide Web technologies, the RAIS offers essential tools that are used in the risk assessment process or anywhere from project scoping to implementation. The RAIS tools can be located directly at http://risk.lsd.ornl.gov/homepage/rap{_}tool.htm or through the CRE`s homepage at http://www.doe.gov/riskcenter/home.html.

  18. Hazards Survey and Hazards Assessments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

  19. CRAD, Configuration Management Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

  20. LANL Natural Resource Damage Assessment

    Broader source: Energy.gov [DOE]

    This Performance Work Statement (PWS) sets forth the tasks to be performed to complete a Natural Resource Damage Assessment (NRDA) and Restoration Plan based on injuries to natural resources from the release of hazardous substances from the Los Alamos National Laboratory (LANL).

  1. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-05-01

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  2. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-08-01

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  3. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-05-01

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of key transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturers factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCBs actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  4. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  5. State Energy Data Needs Assessment

    Reports and Publications (EIA)

    2009-01-01

    This report responds to Section 805(d) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-140, requiring the Energy Information Administration to assess State-level energy data needs and submit to Congress a plan to address those needs.

  6. Ocean current resource assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ocean current resource assessment Ocean current resource assessment Ocean current resource assessment 45_ocean_resource_gtrc_haas.ppt (531 KB) More Documents & Publications Tidal Energy Resource Assessment Free Flow Energy (TRL 1 2 3 Component) - Design and Development of a Cross-Platform Submersible Generator Optimized for the Conditions of Current Energy Conversion

  7. Draft Innovative Exploration Technologies Needs Assessment

    Broader source: Energy.gov [DOE]

    A draft needs assessment for the Geothermal Technologies Programs Innovative Exploration Technologies Subprogram.

  8. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report covers the Wind and Water Power Technologies Office's Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014. Wind Integration, Transmission, and Resource Assessment and Characterization Projects (3.35 MB)

  9. JC3 High Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Assessment Bulletins JC3 High

  10. JC3 Low Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Impact Assessment Bulletins JC3 Low

  11. JC3 Medium Impact Assessment Bulletins | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medium Impact Assessment Bulletins JC3 Medium

  12. Pumping System Assessment Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pumping System Assessment Tool Pumping System Assessment Tool April 10, 2014 - 3:42pm Addthis Pumping System Assessment Tool The Pumping System Assessment Tool (PSAT) is a free online software tool to help industrial users assess the efficiency of pumping system operations. PSAT uses achievable pump performance data from Hydraulic Institute standards and motor performance data from the MotorMaster+ database to calculate potential energy and associated cost savings. The tool also enables users to

  13. Industrial Assessment Centers (IACs) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » Industrial Assessment Centers (IACs) Industrial Assessment Centers (IACs) Industrial Assessment Centers (IACs) Small- and medium-sized manufacturers may be eligible to receive a no-cost assessment provided by DOE Industrial Assessment Centers (IACs). Teams located at 24 universities around the country conduct the energy audits to identify opportunities to improve productivity, reduce waste, and save energy. IACs typically identify more than $130,000 in potential annual

  14. Salt site performance assessment activities

    SciTech Connect (OSTI)

    Kircher, J.F.; Gupta, S.K.

    1983-01-01

    During this year the first selection of the tools (codes) for performance assessments of potential salt sites have been tentatively selected and documented; the emphasis has shifted from code development to applications. During this period prior to detailed characterization of a salt site, the focus is on bounding calculations, sensitivity and with the data available. The development and application of improved methods for sensitivity and uncertainty analysis is a focus for the coming years activities and the subject of a following paper in these proceedings. Although the assessments to date are preliminary and based on admittedly scant data, the results indicate that suitable salt sites can be identified and repository subsystems designed which will meet the established criteria for protecting the health and safety of the public. 36 references, 5 figures, 2 tables.

  15. Balanced Scorecard Performance Assessment Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.3 May 2016 ______________________________________________________________________________ 1 Balanced Scorecard Performance Assessment Program [References: FAR Subpart 17.6, DEAR 970.0370-1, DEAR 970.4401-1, DEAR 970.4402-2] 1. Summary of Latest Changes This update revises the applicability of the Balanced Scorecard Program to DOE management and operating (M&O) contracts. Federal procurement offices are encouraged to continue their use of the BSC, however, The Critical Few Program has

  16. ORISE: Radiological program assessment services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiological program assessment services Minimizing the risk of human exposure to hazardous levels of radioactive materials requires designing a comprehensive safety program that ensures appropriate measures are taken to protect workers and the public. As a U.S. Department of Energy (DOE) institute, the Oak Ridge Institute for Science and Education (ORISE) understands the importance of having an effective safety program in place to assure stakeholders and regulators that your radiological

  17. Grid Cyber Vulnerability & Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cyber Vulnerability & Assessments - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs

  18. Assessing Your Renewable Energy Resources

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Assessing Your Renewable Energy Resources Roger Taylor Principal Project Manager Tribal Energy Program 10/27/2010 NATIONAL RENEWABLE ENERGY LABORATORY Clear Sky Direct (Beam) Global (Total) Diffuse (Sky) NATIONAL RENEWABLE ENERGY LABORATORY Partly Cloudy Sky Direct (Beam) Global (Total) Diffuse (Sky) NATIONAL RENEWABLE ENERGY

  19. Cyber-Based Vulnerability Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cyber-Based Vulnerability Assessments - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs

  20. Hydrogen Knowledge and Opinions Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008-2009 DOE Hydrogen Program: Hydrogen Knowledge and Opinions Assessment Rick Schmoyer Oak Ridge National Laboratory May 21, 2009 Project ID # edp_02_schmoyer This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Managed by UT-Battelle for the Department of Energy Overview * Start: April 2003 * End: 2012 (currently in "Phase II") * Percent complete: ~75% B. Mixed Messages E. Regional Differences F. Difficulty of Measuring Success *

  1. Preliminary melter performance assessment report

    SciTech Connect (OSTI)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

  2. Seismic assessment of buried pipelines

    SciTech Connect (OSTI)

    Al-Chaar, G.; Brady, P.; Fernandez, G.

    1995-12-31

    A structure and its lifelines are closely linked because the disruption of lifeline systems will obstruct emergency service functions that are vitally needed after an earthquake. As an example of the criticality of these systems, the Association of Bay Area Government (ABAG) recorded thousands of leaks in pipelines that resulted in more than twenty million gallons of hazardous materials being released in several recorded earthquakes. The cost of cleaning the spills from these materials was very high. This information supports the development of seismic protection of lifeline systems. The US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL) has, among its missions, the responsibility to develop seismic vulnerability assessment procedures for military installations. Within this mission, a preliminary research program to assess the seismic vulnerability of buried pipeline systems on military installations was initiated. Phase 1 of this research project resulted in two major studies. In the first, evaluating current procedures to seismically design or evaluate existing lifeline systems, the authors found several significant aspects that deserve special consideration and need to be addressed in future research. The second was focused on identifying parameters related to buried pipeline system vulnerability and developing a generalized analytical method to relate these parameters to the seismic vulnerability assessment of existing pipeline systems.

  3. Life assessments of a boiler economizer unit

    SciTech Connect (OSTI)

    Lichti, K.A.; Thomas, C.W.; Wilson, P.T.; Julian, W.

    1997-09-01

    An economizer which experienced pitting corrosion during a cleaning accident was subject to recurring corrosion fatigue failures. A condition assessment was undertaken to assess the risk of further failures through metallurgical assessment, extreme value pitting assessments, and on-site NDT condition assessment with on-site extreme value pitting analysis. This was followed by a fatigue life assessment in accordance with PD6493. Condition assessment work and lifetime prediction progressed from initial failure investigation through to final recommendations in a stepwise process. Each stage of the work was followed by a review of the findings and an economic assessment of the alternative options i.e. continue with assessment, full economizer replacement or partial replacement. Selective replacement of a portion of the economizer was recommended.

  4. Risk assessment and toxicology databases for health effects assessment

    SciTech Connect (OSTI)

    Lu, P.Y.; Wassom, J.S.

    1990-12-31

    Scientific and technological developments bring unprecedented stress to our environment. Society has to predict the results of potential health risks from technologically based actions that may have serious, far-reaching consequences. The potential for error in making such predictions or assessment is great and multiplies with the increasing size and complexity of the problem being studied. Because of this, the availability and use of reliable data is the key to any successful forecasting effort. Scientific research and development generate new data and information. Much of the scientific data being produced daily is stored in computers for subsequent analysis. This situation provides both an invaluable resource and an enormous challenge. With large amounts of government funds being devoted to health and environmental research programs and with maintenance of our living environment at stake, we must make maximum use of the resulting data to forecast and avert catastrophic effects. Along with the readily available. The most efficient means of obtaining the data necessary for assessing the health effects of chemicals is to utilize applications include the toxicology databases and information files developed at ORNL. To make most efficient use of the data/information that has already been prepared, attention and resources should be directed toward projects that meticulously evaluate the available data/information and create specialized peer-reviewed value-added databases. Such projects include the National Library of Medicine`s Hazardous Substances Data Bank, and the U.S. Air Force Installation Restoration Toxicology Guide. These and similar value-added toxicology databases were developed at ORNL and are being maintained and updated. These databases and supporting information files, as well as some data evaluation techniques are discussed in this paper with special focus on how they are used to assess potential health effects of environmental agents. 19 refs., 5 tabs.

  5. Quality assessment: A performance-based approach to assessments

    SciTech Connect (OSTI)

    Caplinger, W.H.; Greenlee, W.D.

    1993-08-01

    Revision C to US Department of Energy (DOE) Order 5700.6 (6C) ``Quality Assurance`` (QA) brings significant changes to the conduct of QA. The Westinghouse government-owned, contractor-operated (GOCO) sites have updated their quality assurance programs to the requirements and guidance of 6C, and are currently implementing necessary changes. In late 1992, a Westinghouse GOCO team led by the Waste Isolation Division (WID) conducted what is believed to be the first assessment of implementation of a quality assurance program founded on 6C.

  6. Office of Security Assessments - Report Titles | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Assessments - Report Titles Office of Security Assessments - Report Titles 2016 Office of Enterprise Assessments Safeguards and Security Inspection at the Sandia National Laboratory New Mexico, January 19, 2016 (classified) Office of Enterprise Assessments Security Assessment of the Oak Ridge National Laboratory Sensitive Compartmented Information Facilities Assessment, March 2016 (OUO) Office of Enterprise Assessments Security Assessment of the Y-12 National Security Complex Sensitive

  7. Corral Monitoring System assessment results

    SciTech Connect (OSTI)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  8. Biomass cogeneration. A business assessment

    SciTech Connect (OSTI)

    Skelton, J.C.

    1981-11-01

    This guide serves as an overview of the biomass cogeneration area and provides direction for more detailed analysis. The business assessment is based in part on discussions with key officials from firms that have adopted biomass cogeneration systems and from organizations such as utilities, state and federal agencies, and banks that would be directly involved in a biomass cogeneration project. The guide is organized into five chapters: biomass cogeneration systems, biomass cogeneration business considerations, biomass cogeneration economics, biomass cogeneration project planning, and case studies.

  9. Water quality assessment in Ecuador

    SciTech Connect (OSTI)

    Chudy, J.P.; Arniella, E.; Gil, E.

    1993-02-01

    The El Tor cholera pandemic arrived in Ecuador in March 1991, and through the course of the year caused 46,320 cases, of which 692 resulted in death. Most of the cases were confined to cities along Ecuador's coast. The Water and Sanitation for Health Project (WASH), which was asked to participate in the review of this request, suggested that a more comprehensive approach should be taken to cholera control and prevention. The approach was accepted, and a multidisciplinary team consisting of a sanitary engineer, a hygiene education specialist, and an institutional specialist was scheduled to carry out the assessment in late 1992 following the national elections.

  10. Assessment of Residential GSHP System

    SciTech Connect (OSTI)

    Liu, Xiaobing

    2010-09-01

    This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

  11. Local Option- Property Assessed Clean Energy

    Office of Energy Efficiency and Renewable Energy (EERE)

    Property-Assessed Clean Energy (PACE) financing effectively allows property owners to borrow money to pay for energy improvements. The amount borrowed is repaid via a special assessment on the pr...

  12. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  13. Contractor Performance Assessment Reporting System (CPARS)

    Broader source: Energy.gov [DOE]

    The CPAR assesses a contractor’s performance, both positive and negative, and provides a record on a given contract during a specified period of time. Each assessment must be based on objective...

  14. JOBAID-PARTICIPATING IN COMPETENCY ASSESSMENTS (SUPERVISOR)

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide supervisors through the step-by-step process of participating in a competency assessment by viewing gaps, assigning items, conducting a self-assessment,...

  15. Property Tax Assessment for Commercial Wind Farms

    Broader source: Energy.gov [DOE]

    In 2010, S.B. 918 consolidated and amended property tax assessment laws in Pennsylvania. The provisions governing the assessment of wind energy facilities were relocated at this time, but not cha...

  16. Local Option- Property Assessed Clean Energy

    Office of Energy Efficiency and Renewable Energy (EERE)

    Property-Assessed Clean Energy (PACE) financing effectively allows property owners to borrow money to pay for energy improvements. The amount borrowed is typically repaid via a special assessment...

  17. Environmental Assessments | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessments DOE/EA-1976 Emera CNG, LLC, Compressed Natural Gas Project, Port of Palm Beach, City of Riviera Beach, Palm Beach County, FL Final Environmental Assessment (Oct 2015) Finding of No Significant Impact (Oct 2015) DOE/EA-1616A: National Carbon Capture Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, AL Final Environmental Assessment (Aug 2014) Finding of No Significant Impact (Aug 2014) DOE/EA-1616: Environmental Assessment for Proposed

  18. EPA`s risk assessment guidelines: Overview

    SciTech Connect (OSTI)

    Patton, D.E.

    1990-12-31

    The US Environmental Protection Agency (EPA) risk assessment guidelines for cancer, quantification, and exposure issues are discussed.

  19. Generalized Comprehensive Mitigation Assessment Process (GCOMAP...

    Open Energy Info (EERE)

    Generalized Comprehensive Mitigation Assessment Process (GCOMAP) (Redirected from GCOMAP) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Generalized Comprehensive...

  20. Generalized Comprehensive Mitigation Assessment Process (GCOMAP...

    Open Energy Info (EERE)

    search Tool Summary LAUNCH TOOL Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) AgencyCompany Organization: Lawrence Berkeley National Laboratory...

  1. Assessment of replicable innovative industrial cogeneration applications

    SciTech Connect (OSTI)

    None, None

    2001-06-01

    This report provides a market assessment of innovative industrial DG cogeneration systems that are less than 1 MWe.

  2. Hydrogen Risk Assessment Model (HyRAM)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Storage Components and Systems Batteries Electric Drive Systems Hydrogen Materials & Components Compatibility Hydrogen Behavior Quantitative Risk Assessment Technical ...

  3. Cyber and Security Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cyber and Security Assessments Cyber and Security Assessments Cyber and Security Assessments within the Office of Independent Enterprise Assessments implements the independent security performance monitoring functions for DOE. The other half of the Independent Oversight Program is implemented by the Office of Safety and Emergency Management Evaluations for safety oversight. The independent oversight function performed by these two offices is delineated in DOE Order 227.1A, Independent Oversight

  4. Quality Procedure - Independent Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Assessments Quality Procedure - Independent Assessments This procedure establishes the process for planning, performing, and reporting Independent Assessments (i.e., assist visits, program/project reviews, direct observations, etc.) as conducted by the Office of Standards and Quality Assurance. Independent assessments are performed at EM Headquarters and Field Offices to determine compliance to requirements and to identify systemic issues, potential risk, emerging issues, and for

  5. Beryllium Program Performance Assessments - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium...

  6. Total System Performance Assessment Peer Review Panel

    Broader source: Energy.gov [DOE]

    Total System Performance Assessment (TSPA) Peer Review Panel for predicting the performance of a repository at Yucca Mountain.

  7. Assessments InfoCenter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments InfoCenter Assessments InfoCenter The U.S. Department of Energy's (DOE) enterprise assessment programs provide line management, Congress, and other stakeholders with an independent evaluation of safety, emergency management, security and cyber performance and programs to ensure these, and other critical areas as directed by the Secretary of Energy, are appropriately addressed. Assessment related information is made available to DOE senior management and stakeholders, such as

  8. Tidal Energy Resource Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tidal Energy Resource Assessment Tidal Energy Resource Assessment Tidal Energy Resource Assessment 51_tidalresource_gtrc_haas.ppt (8.56 MB) More Documents & Publications Ocean current resource assessment Free Flow Energy (TRL 1 2 3 Component) - Design and Development of a Cross-Platform Submersible Generator Optimized for the Conditions of Current Energy Conversion Effects on the Physical Environment (Hydrodynamics, and Water Quality Food Web)

  9. Training Self-Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Self-Assessment Training Self-Assessment This document contains four self-assessment forms that are aligned with the Home Energy Professional Certifications. These forms will help individuals gauge competency and identify training needs before an exam is taken. training_self_assessment.xlsx (410.94 KB) More Documents & Publications NREL Job Task Analysis: Quality Control Inspector NREL Job Task Analysis: Crew Leader Preparing for the Quality Control Inspector Certification Exam

  10. Industrial Energy Efficiency Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Energy Efficiency Assessments Industrial Energy Efficiency Assessments Details about the Industrial Energy Efficiency Assessments program and its implementation in China. session_2_industry_track_price_en.pdf (1.27 MB) session_2_industry_track_price_cn.pdf (1.47 MB) More Documents & Publications UAIEE and Industrial Assessment Centers The Second US-China Energy Efficiency Forum: Energy Management Standards and Implementation Energy Efficiency Financing

  11. Office of Cyber Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cyber Assessments Office of Cyber Assessments MISSION The Office of Cyber Assessments is responsible for the independent evaluation of the effectiveness of classified and unclassified computer security policies and programs throughout the Department. The Office has established and maintains a continuous program for assessing the security of DOE classified and unclassified networks through expert program and technical analysis, including detailed network penetration testing to detect

  12. Performance Assessment Institute-NV

    SciTech Connect (OSTI)

    Lombardo, Joesph

    2012-12-31

    The National Supercomputing Center for Energy and the Environment’s intention is to purchase a multi-purpose computer cluster in support of the Performance Assessment Institute (PA Institute). The PA Institute will serve as a research consortium located in Las Vegas Nevada with membership that includes: national laboratories, universities, industry partners, and domestic and international governments. This center will provide a one-of-a-kind centralized facility for the accumulation of information for use by Institutions of Higher Learning, the U.S. Government, and Regulatory Agencies and approved users. This initiative will enhance and extend High Performance Computing (HPC) resources in Nevada to support critical national and international needs in "scientific confirmation". The PA Institute will be promoted as the leading Modeling, Learning and Research Center worldwide. The program proposes to utilize the existing supercomputing capabilities and alliances of the University of Nevada Las Vegas as a base, and to extend these resource and capabilities through a collaborative relationship with its membership. The PA Institute will provide an academic setting for interactive sharing, learning, mentoring and monitoring of multi-disciplinary performance assessment and performance confirmation information. The role of the PA Institute is to facilitate research, knowledge-increase, and knowledge-sharing among users.

  13. Risk Assessment/Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factormore » (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis« less

  14. (Radiological assessments of radionuclide releases)

    SciTech Connect (OSTI)

    Hoffman, F.O.

    1990-12-28

    As a consequence of the Chernobyl accident, data have been obtained throughout the Northern Hemisphere on the concentrations of radionuclides in air, vegetation, soil, water, and foodstuffs that could be important means of human exposure. At the IAEA's invitation, the traveler reviewed recently published data and handbook summaries. The traveler evaluated the need for revising the default values recommended in Chapter 5, Terrestrial and Aquatic Food Chain Transport,'' of IAEA Safety Series No. 57. All attempts at revision were made to keep the mathematical complexity of the models to a minimum without substantial underestimation of dose to critical population subgroups. The traveler also served as chairman of the Multiple Pathways Working Group of the Coordinated Research Program on VAMP. This group has been established to test predictions of models assessing multiple exposure pathways potentially leading to human exposure to {sup 137}Cs. Testing is carried out for major components of assessment models that predict deposition, environmental transport, food chain bioaccumulation, and subsequent uptake and retention in the human body and dose due to exposure to external gamma radiation.

  15. Geothermal Resources Assessment in Hawaii

    SciTech Connect (OSTI)

    Thomas, D.M.

    1984-10-01

    The Hawaii Geothermal Resources Assessment Program was initiated in 1978. The preliminary phase of this effort identified 20 Potential Geothermal Resource Areas (PGRA's) using available geological, geochemical and geophysical data. The second phase of the Assessment Program undertook a series of field studies, utilizing a variety of geothermal exploration techniques, in an effort to confirm the presence of thermal anomalies in the identified PGRA's and, if confirmed, to more completely characterize them. A total of 15 PGRA's on four of the five major islands in the Hawaiian chain were subject to at least a preliminary field analysis. The remaining five were not considered to have sufficient resource potential to warrant study under the personnel and budget constraints of the program. The island of Kauai was not studied during the current phase of investigation. Geothermal field studies were not considered to be warranted due to the absence of significant geochemical or geophysical indications of a geothermal resource. The great age of volcanism on this island would further suggest that should a thermal resource be present, it would be of low temperature. The geothermal field studies conducted on Oahu focused on the caldera complexes of the two volcanic systems which form the island: Waianae volcano and Koolau volcano. The results of these studies and the interpreted probability for a resource are presented.

  16. LNG Safety Assessment Evaluation Methods

    SciTech Connect (OSTI)

    Muna, Alice Baca; LaFleur, Angela Christine

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  17. OTEC resource assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OTEC resource assessment OTEC resource assessment OTEC resource assessment 44_ocea-lmco-ascari.ppt (2.98 MB) More Documents & Publications Ocean Thermal Extractable Energy Visualization: Final Technical Report OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation (OPPSDIV)

  18. Community Readiness Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Readiness Assessments Community Readiness Assessments Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Community Readiness Assessments, Call Slides and Discussion Summary, December 5, 2013. Call Slides and Discussion Summary (1.6 MB) More Documents & Publications Focus Series: Program Finds Community "Readiness" Is the Key to More Retrofits Contractor-Funded Incentives Better Buildings Network View | April 2015

  19. NGNP SITE 2 HAZARDS ASSESSMENT

    SciTech Connect (OSTI)

    Wayne Moe

    2011-10-01

    The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints

  20. Environmental Assessment DOE/EA-1405

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    405 Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 2002 U.S. Department of Energy DOE/EA-1405 Environmental Assessment March 2002 This page intentionally left blank. DOE/EA-1405 U.S. Department of Energy Preface Environmental Assessment P-1 March 2002 PREFACE This environmental assessment was prepared to assess potential environmental impacts

  1. Groundwater Data Package for Hanford Assessments

    SciTech Connect (OSTI)

    Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.; Freedman, Vicky L.

    2006-01-31

    This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management and Integration Project (#47043).

  2. Communicating Performance Assessments Results - 13609

    SciTech Connect (OSTI)

    Layton, Mark

    2013-07-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is

  3. Uncertainties in risk assessment at USDOE facilities

    SciTech Connect (OSTI)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  4. Assessing the Security Vulnerabilities of Correctional Facilities

    SciTech Connect (OSTI)

    Morrison, G.S.; Spencer, D.S.

    1998-10-27

    The National Institute of Justice has tasked their Satellite Facility at Sandia National Laboratories and their Southeast Regional Technology Center in Charleston, South Carolina to devise new procedures and tools for helping correctional facilities to assess their security vulnerabilities. Thus, a team is visiting selected correctional facilities and performing vulnerability assessments. A vulnerability assessment helps to identi~ the easiest paths for inmate escape, for introduction of contraband such as drugs or weapons, for unexpected intrusion fi-om outside of the facility, and for the perpetration of violent acts on other inmates and correctional employees, In addition, the vulnerability assessment helps to quantify the security risks for the facility. From these initial assessments will come better procedures for performing vulnerability assessments in general at other correctional facilities, as well as the development of tools to assist with the performance of such vulnerability assessments.

  5. Facility target insert shielding assessment

    SciTech Connect (OSTI)

    Mocko, Michal

    2015-10-06

    Main objective of this report is to assess the basic shielding requirements for the vertical target insert and retrieval port. We used the baseline design for the vertical target insert in our calculations. The insert sits in the 12”-diameter cylindrical shaft extending from the service alley in the top floor of the facility all the way down to the target location. The target retrieval mechanism is a long rod with the target assembly attached and running the entire length of the vertical shaft. The insert also houses the helium cooling supply and return lines each with 2” diameter. In the present study we focused on calculating the neutron and photon dose rate fields on top of the target insert/retrieval mechanism in the service alley. Additionally, we studied a few prototypical configurations of the shielding layers in the vertical insert as well as on the top.

  6. Simulation Enabled Safeguards Assessment Methodology

    SciTech Connect (OSTI)

    Robert Bean; Trond Bjornard; Thomas Larson

    2007-09-01

    It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology (SESAME) has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements in functionality. Drag and drop wireframe construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed.

  7. [Multifractal cloud properties data assessment

    SciTech Connect (OSTI)

    Gautier, C.; Ricchiazzi, P.; Peterson, P.; Lavallee, D. ); Frouin, R.; Lubin, D. ); Lovejoy, S. ); Schertzer, D. )

    1992-05-06

    Our group has been very active over the last year, analyzing a number of data sets to characterize multifractal cloud properties and assess the effects of clouds on surface radiation properties (spectral and broadband). The data sets analyzed include: AVHRR observations of clouds over the ocean, SPOT observations of clouds over the ocean, SSM/I observations of clouds over the ocean, pyranometer data with all-sky photographs, pyrgeometer data all-sky photographs, and spectral surface irradiance all-sky photographs. A number of radiative transfer computations have been performed to help in the interpretation of these observations or provide theoretical guidance for their analysis. Finally 4 number of radiative transfer models have been acquired and tested to prepare for the interpretation of ARM/CART data.

  8. Process Waste Assessment - Paint Shop

    SciTech Connect (OSTI)

    Phillips, N.M.

    1993-06-01

    This Process Waste Assessment was conducted to evaluate hazardous wastes generated in the Paint Shop, Building 913, Room 130. Special attention is given to waste streams generated by the spray painting process because it requires a number of steps for preparing, priming, and painting an object. Also, the spray paint booth covers the largest area in R-130. The largest and most costly waste stream to dispose of is {open_quote}Paint Shop waste{close_quotes} -- a combination of paint cans, rags, sticks, filters, and paper containers. These items are compacted in 55-gallon drums and disposed of as solid hazardous waste. Recommendations are made for minimizing waste in the Paint Shop. Paint Shop personnel are very aware of the need to minimize hazardous wastes and are continuously looking for opportunities to do so.

  9. Simulation enabled safeguards assessment methodology

    SciTech Connect (OSTI)

    Bean, Robert; Bjornard, Trond; Larson, Tom

    2007-07-01

    It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements in functionality. Drag and drop wire-frame construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed. (authors)

  10. Enterprise Assessments Emergency Management Assessment of the Waste Isolation Pilot Plant … April 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emergency Management Assessment of the Waste Isolation Pilot Plant April 2016 Office of Emergency Management Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  11. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  12. Griffiss AFB integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  13. The future of FRMAC assessment.

    SciTech Connect (OSTI)

    Laiche, Thomas P.

    2010-03-01

    FRMAC was born out of circumstances 25 years ago when 17 federal agencies descended on the states with good intention during the Three-Mile Island nuclear power plant incident. At that time it quickly became evident that a better way was needed to support state and local governments in their time of emergency and recovery process. FRMAC's single voice of Federal support coordinates the multiple agencies that respond to a radiological event. Over the years, FRMAC has exercised, evaluated, and honed its ability to quickly respond to the needs of our communities. As the times have changed, FRMAC has expanded its focus from nuclear power plant incidents, to threats of a terrorist radiological dispersal device (RDD), to the unthinkable - an Improvised nuclear device (IND). And just as having the right tools are part of any trade, FRMAC's tool set has and is evolving to meet contemporary challenges - not just to improve the time it takes to collect data and assess the situation, but to provide a quality and comprehensive product that supports a stressed decision maker, responsible for the protection of the public. Innovations in the movement of data and information have changed our everyday lives. So too, FRMAC is capitalizing on industry innovations to improve the flow of information: from the early predictive models, to streamlining the process of getting data out of the field; to improving the time it takes to get assessed products in to the hands of the decision makers. FRMAC is focusing on the future through the digital age of electronic data processing. Public protective action and dose avoidance is the challenge.

  14. Mathematical models for risk assessment

    SciTech Connect (OSTI)

    Zaikin, S.A.

    1995-12-01

    The use of mathematical models in risk assessment results in the proper understanding of many aspects of chemical exposure and allows to make more actual decisions. Our project ISCRA (Integrated Systems of Complex Risk Assessment) has the aim to create integrated systems of algorythms for prediction of pollutants` exposure on human and environmental health and to apply them for environmental monitoring, and decision-making. Mathematical model {open_quotes}MASTER{close_quotes} (Mathematical Algorythm of SimulaTion of Environmental Risk) represents the complex of algorythmical blocks and is intended for the prediction of danger of pollutants` exposure for human and environmental risk. Model LIMES (LIMits EStimation) is developed for prognosis of safety concentrations of pollutants in the environment both in the case of isolated exposure and in the case of complex exposure for concrete location. Model QUANT (QUANtity of Toxicant) represents the multicompartmental physiological pharmacokinetic model describing absorption, distribution, fate, metabolism, and elimination of pollutants in the body of different groups of human population, as a result of the different kind of exposure. Decision support system CLEVER (Complex LEVE1 of Risk) predicts the probability and the degree of development of unfavourable effects as result of exposure of pollutant on human health. System is based on the data of epidemiological and experimental researches and includes several mathematical models for analysis of {open_quotes}dose-time-response{close_quotes} relations and information about clinical symptoms of diseases. Model CEP (Combination Effect Prognosis) contains probabilistic algorythms for forecasting the effect of simultaneous impact of several factors polluting the environment. The result of the program work is the prediction of an independent exposure of two or more factors, and intensification or weakening of exposure in depending on factors` interactions.

  15. Fort Drum integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  16. Fort Stewart integrated resource assessment. Volume 3: Resource assessment

    SciTech Connect (OSTI)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01

    The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  17. Assessment and Mapping of the Riverine Hydrokinetic Resource...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report that describes the methodology and results of the most rigorous assessment to date ... In-stream hydrokinetic resource assessment NSD Methodology Report An Assessment of Energy ...

  18. DOE Order 435.1 Performance Assessment Savannah River Site |...

    Energy Savers [EERE]

    Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level ...

  19. Webinar: Genetically Modified Algae: A Risk-Benefit Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Algae: A Risk-Benefit Assessment Webinar: Genetically Modified Algae: A Risk-Benefit Assessment Genetically Modified (GM) Algae: A Risk-Benefit Assessment PDF icon...

  20. Assessing Revenue Streams: What Is Right for Your Program? |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessing Revenue Streams: What Is Right for Your Program? Assessing Revenue Streams: What Is Right for Your Program? Program Sustainability Peer Exchange Call: Assessing Revenue ...

  1. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  2. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  3. CRAD, Measuring and Testing Equipment Assessment Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Measuring and Testing Equipment Assessment Plan CRAD, Measuring and Testing Equipment Assessment Plan Performance Objective: The objective of this assessment is to determine ...

  4. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  5. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  6. EA-1008: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1008: Final Environmental Assessment EA-1008: Final Environmental Assessment Continued ... Environmental Assessment EA-1236: Finding of No Significant Impact EA-1956: Final

  7. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  8. Enterprise Assessments Review of the East Tennessee Technology...

    Broader source: Energy.gov (indexed) [DOE]

    Emergency Management Program July 2015 Office of Emergency Management Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S....

  9. Industrial Assessment Centers (IAC) Update -- July 2015 | Department...

    Office of Environmental Management (EM)

    Industrial Assessment Centers (IAC) Update -- July 2015 Industrial Assessment Centers (IAC) Update -- July 2015 Read the Industrial Assessment Centers (IAC) Update -- July 2015...

  10. Pumping System Assessment Tool Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pumping System Assessment Tool Overview Pumping System Assessment Tool Overview This power point presentation provides an overview of AMO's pumping system assessment tool (PSAT) ...

  11. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  12. Predictive Dynamic Security Assessment through Advanced Computing

    SciTech Connect (OSTI)

    Huang, Zhenyu; Diao, Ruisheng; Jin, Shuangshuang; Chen, Yousu

    2014-11-30

    Abstract— Traditional dynamic security assessment is limited by several factors and thus falls short in providing real-time information to be predictive for power system operation. These factors include the steady-state assumption of current operating points, static transfer limits, and low computational speed. This addresses these factors and frames predictive dynamic security assessment. The primary objective of predictive dynamic security assessment is to enhance the functionality and computational process of dynamic security assessment through the use of high-speed phasor measurements and the application of advanced computing technologies for faster-than-real-time simulation. This paper presents algorithms, computing platforms, and simulation frameworks that constitute the predictive dynamic security assessment capability. Examples of phasor application and fast computation for dynamic security assessment are included to demonstrate the feasibility and speed enhancement for real-time applications.

  13. A Resilient Condition Assessment Monitoring System

    SciTech Connect (OSTI)

    Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

    2012-08-01

    An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

  14. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  15. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  16. Structural assessment of accident loads

    SciTech Connect (OSTI)

    Wagenblast, G.R., Westinghouse Hanford

    1996-05-28

    Structural assessments were made for specific accident loads for specific catch, receiver, and storage tanks. The evaluation herein represents level-of-effort order-of-magnitude estimates of limiting loads that would lead to collapse or rupture of the tank and unmitigated loss of confinement for the waste. Structural capacities were established using failure criteria. Compliance with codes such as ACI, ASCE, ASME, RCRA, UBC, WAC, and DOE Orders was `NOT` maintained. Normal code practice is to prevent failure with margins consistent with expected variations in loads and strengths and confidence in analysis techniques. The evaluation herein represent estimates of code limits without code load factors or code strength reduction factors, and loading beyond such a limit is considered as an onset of some failure mode. The exact nature of the failure mode and its relation to a safe condition is a judgment of the analyst. Consequently, these `RESULTS SHALL NOT BE USED TO ESTABLISH OPERATING OR SAFETY LOAD LIMITS FOR THESE TANKS`.

  17. Live Fire Range Environmental Assessment

    SciTech Connect (OSTI)

    1993-08-01

    The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  18. NREL: Energy Analysis - Life Cycle Assessment Harmonization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Analysis Printable Version Life Cycle Assessment Harmonization Life Cycle Greenhouse Gas Emissions from Electricity Generation (Fact Sheet) Cover of the Life Cycle Greenhouse Gas Emissions from Electricity Generation factsheet Download the Fact Sheet The U.S. Department of Energy enlisted NREL to review and "harmonize" life cycle assessments (LCA) of electricity generation technologies. Hundreds of assessments have been published, often with considerable variability in results.

  19. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Wind Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to 2014, DOE's Wind Program announced awards totaling more than $25 million for 41 projects focused on integration, transmission, and resource assessment and characterization. This report highlights each of these R&D efforts. Wind Integration, Transmission, and

  20. Environmental Assessment Kotzebue Wind Installation Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND

  1. National Geothermal Resource Assessment and Classification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Geothermal Resource Assessment and Classification Colin F. Williams US Geological Survey Data Systems and Analysis (Resource Assessment) April 24, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. 2 | US DOE Geothermal Office eere.energy.gov Relevance/Impact of Research * Overall Summary - Major Project Goals * Develop new Geothermal Resource Classification standards * Expand Resource Assessment scope across all 50 states

  2. Enterprise Assessments Review, West Valley Demonstration Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2014 | Department of Energy Radiological Controls Activity-Level Implementation The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's Office of Enterprise Assessments, conducted an independent oversight review of activity-level implementation of the radiation protection program at the West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June 9-13, 2014. Enterprise Assessments Review, West Valley

  3. Enterprise Assessments Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2014 | Department of Energy Sandia National Laboratories - November 2014 Enterprise Assessments Targeted Review, Sandia National Laboratories - November 2014 November 2014 Targeted Review of Work Planning and Control at the Sandia National Laboratories The U.S. Department of Energy (DOE) Office of Environment, Safety and Health Assessments, within the Office of Enterprise Assessments, conducted an independent review of the Sandia National Laboratories (SNL) activity-level work

  4. Dormant storage reliability assessments-data based

    SciTech Connect (OSTI)

    Merren, G.T.

    1981-01-01

    A relatively large amount of data pertaining to the performance of certain electronic parts after long periods of dormant storage has been collected and analyzed by the Reliability Department of Sandia National Laboratories. The failure models used by Sandia are presented and reliability assessments for selected electronic parts derived from these models and the measured performance data are provided. These data based assessments are compared to similar assessments derived from handbook calculations using the general data and models provided in the handbooks.

  5. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting es111_gallagher_2012_o.pdf (1.1 MB) More Documents & Publications Promises and Challenges of Lithium- and Manganese-Rich Transition-Metal Layered-Oxide Cathodes PHEV Battery Cost Assessment EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

  6. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD July 15, 2016

  7. EA-2041: Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Environmental Assessment EA-2041: Environmental Assessment Cameron LNG Expansion Project The Federal Energy Regulatory Commission prepared an environmental assessment that examines the potential environmental impacts of a proposal to construct additional natural gas liquefaction and export facilities at the existing Cameron Liquefied Natural Gas Terminal in Cameron and Calcasieu Parishes, Louisiana. On July 15, 2016, DOE issued a FONSI adopting the EA by reference. For more information:

  8. Technology Readiness Assessment Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Readiness Assessment Report Technology Readiness Assessment Report This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the U.S. Department of Energy's Office of Environmental Management (DOE-EM). The Process Guide is intended to be a 'living document' and will be modified periodically as the understandings of TRA/TMP processes evolve. Technology Readiness

  9. Argonne National Laboratory Launches Bioenergy Assessment Tools |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools September 30, 2013 - 4:00pm Addthis A researcher loads a biomass sample into spinning ring cup. Argonne National Laboratory has launched two online tools that assess the resource consumption and greenhouse gas emissions associated with biofuel production. | Photo courtesy of National Renewable Energy Laboratory A researcher loads a biomass

  10. Tiger Team assessment of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1990-05-01

    This Document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Pinellas Plant, Pinellas County, Florida. The assessment wa directed by the Department's Office of Environment, Safety, and Health (ES H) from January 15 to February 2, 1990. The Pinellas Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environment Safety and Health, and Management areas and determines the plant's compliance with applicable Federal (including DOE), State, and local regulations and requirements.

  11. INDUSTRIAL ASSESSMENT CENTERS IAC Quarterly Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summer 2015 INDUSTRIAL ASSESSMENT CENTERS IAC Quarterly Update Spring 2014 INDUSTRIAL ASSESSMENT CENTERS The IAC Update, Summer 2015 About the IAC Program Beginning in 1976, the Industrial Assessment Centers (IACs) have provided small and medium-sized manufacturers with site- specific recommendations for improving energy efficiency, reducing waste, and increasing productivity through changes in processes and equipment. A typical IAC client will receive recommendations that save more than

  12. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the Sanford Underground Research Facility, Lead, South Dakota May 4, 2015 EA-1989: Draft Environmental Assessment Cliffrose Solar Energy Interconnection Project, Mohave...

  13. Independent Oversight Assessment, DOE Office of Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the evaluation was to provide information regarding the status of the safety culture within the Office of Environmental Management. The data collection phase of the assessment ...

  14. Office of Project Management Oversight & Assessments | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Office of Project Management Oversight & Assessments Career Development Project Management Career Development Program (DOE Only) Acquisition Career Management Program (DOE Only)...

  15. Independent Oversight Assessment, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and ... the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project. ...

  16. Public Involvement in the Environmental Assessment Process

    Broader source: Energy.gov [DOE]

    A DOE policy regarding the online publication and electronic notification of the availability of draft environmental assessments (EAs) for public comment.

  17. Assessment of Replicable Innovative Industrial Cogeneration Applicatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replicable Innovative Industrial Cogeneration Applications, June 2001 Assessment of Replicable Innovative Industrial Cogeneration Applications, June 2001 U.S. industrial facilities ...

  18. AWEA Wind Resource & Project Energy Assessment

    Broader source: Energy.gov [DOE]

    Join the wind industry's leading owners, project developers, and wind assessors as they share latest challenges facing the wind resource assessment community. During this technical event you will...

  19. Commercial Building Stock Assessment: Findings and Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NORTHWEST ENERGY EFFICIENCY ALLIANCE 2014 Commercial Building Stock Assessment: BPA Brown Bag May 20, 2015 Christopher Frye Senior Manager, Market Research and Evaluation Aaron...

  20. NREL: International Activities - Assessments and Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... strategies, West African clean energy development, Latin American clean energy development, energy access and energy poverty, and solar and wind energy resource assessments. ...

  1. Solar Schools Assessment and Implementation Project: Financing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options on Solar Installations on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools This report focuses on ...

  2. Enterprise Assessments Lessons Learned From Targeted Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Planning and Control - March 2016 Enterprise Assessments Lessons Learned From Targeted Reviews of Activity-Level Work Planning and Control - March 2016 March 2016 ...

  3. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  4. Second Assessment, Minnesota: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Second Assessment, Minnesota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.5963193, -93.8481904 Show Map Loading map......

  5. Assessment of Inferred Geothermal Resource: Longavi Project,...

    Open Energy Info (EERE)

    Chile Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Assessment of Inferred Geothermal Resource: Longavi Project, Chile Organization Hot Rock...

  6. Microsoft Word - 12054532_data_assessment.doc

    Office of Legacy Management (LM)

    IV and were sampled by filling bottles at the discharge point. Field Duplicate Assessment Field duplicate samples are collected and analyzed as an indication of overall...

  7. Solar and Wind Energy Resource Assessment (SWERA)

    Open Energy Info (EERE)

    Wiki Page Solar and Wind Energy Resource Assessment A United Nations Environment Programme facilitated effort. Getting Started Data Sets Analysis Tools About SWERA Loading.....

  8. Water resource opportunity assessment: Fort Dix

    SciTech Connect (OSTI)

    Sullivan, G.P.; Hostick, D.J.; Elliott, D.B.; Fitzpatrick, Q.K.; Dahowski, R.T.; Dison, D.R

    1996-12-01

    This report provides the results of the water resource opportunity assessments performed by Pacific Northwest National Laboratory at the Fort Dix facility located in Fort Dix, New Jersey.

  9. Enterprise Assessments Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review, Sandia National Laboratories - November 2014 Enterprise Assessments Targeted Review, Sandia National Laboratories - November 2014 November 2014 Targeted Review of Work ...

  10. Technology Readiness Assessment Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4A, Technology Readiness Assessment Guide by Ruben Sanchez Functional areas: Technical Capability The Guide assists individuals and teams involved in conducting Technology...

  11. Draft Innovative Exploration Technologies Needs Assessment |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Exploration Technologies Technology Needs Assessment Geothermal Technologies Program Peer Review Program June 6 - 10, 2011 The Dixie Valley Geothermal ...

  12. EM Performs Tenth Technology Readiness Assessment

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006.

  13. NREL: Resource Assessment and Forecasting Home Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are used to plan and develop renewable energy technologies and support climate change research. Learn more about NREL's resource assessment and forecasting research:...

  14. National Geothermal Resource Assessment and Classification |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Geothermal Resource Assessment and Classification track 2: hydrothermal | geothermal 2015 peer review National Geothermal Data System Architecture Design, Testing and ...

  15. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 EA-1812: Finding of No Significant Impact Haxtun Wind Energy Project, Logan and Phillips Counties, CO January 20, 2012 EA-1812: Final Environmental Assessment Haxtun Wind...

  16. Savannah River Needs Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Needs Assessment for former Savannah River Site construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes ...

  17. Wind Resource Assessment | Open Energy Information

    Open Energy Info (EERE)

    Databases Global Renewable Energy Database Power Technologies Energy Data Book Solar and Wind Energy Resource Assessment (SWERA) System Advisor Model (SAM) Transparent Cost...

  18. Enterprise Assessments Targeted Review, Idaho National Laboratory...

    Office of Environmental Management (EM)

    Health Assessments, conducted an independent review of the Idaho National Laboratory ... The independent review of the IMCL facility was performed at the Idaho Site from April 28 ...

  19. Assessment of radionuclides (uranium and thorium) atmospheric...

    Office of Scientific and Technical Information (OSTI)

    Title: Assessment of radionuclides (uranium and thorium) atmospheric pollution around Manjung district, Perak using moss as bio-indicator Bio-monitoring method using mosses have ...

  20. Assessment of Energy Use in Multibuilding Facilities

    U.S. Energy Information Administration (EIA) Indexed Site

    Series Assessment of Energy Use in Multibuilding Facilities 35 data. The CBECS Energy Suppliers Survey remains the best source for estimates of district heating and cooling...

  1. CRAD, Conduct of Operations Assessment Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this assessment is to verify programmatic implementation of DOE O 5480.19, "Conduct of Operations Requirements of DOE Facilities"

  2. Preliminary neutronics assessment of fully ceramic microencapsulated...

    Office of Scientific and Technical Information (OSTI)

    gas-cooled reactors Citation Details In-Document Search Title: Preliminary neutronics assessment of fully ceramic microencapsulated fuel in high-temperature gas-cooled ...

  3. Enterprise Assessments Lessons Learned from Targeted Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Targeted Reviews of Fire Protection Programs at Department of Energy Facilities - August 2015 Enterprise Assessments Lessons Learned from Targeted Reviews of Fire ...

  4. Independent Oversight Assessment, Salt Waste Processing Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Headquarters - November 2012 Independent Oversight Assessment, Los Alamos National Laboratory - April 2012 An Independent Evaluation of Safety Culture at the U.S....

  5. Land Use Assessment Toolkit | Open Energy Information

    Open Energy Info (EERE)

    Evaluate public and private sector capacity (e.g., institutional, governance, financial) to support initiatives Assess biophysical and economic potential for these...

  6. Solar Resource and Meteorological Assessment Project (SOLRMAP...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Resource and Meteorological Assessment Project (SOLRMAP) Solar and Meteorological Station Options: Configurations and Specifications July 1, 2009 (revised) Steve Wilcox and ...

  7. Enterprise Assessments Lessons Learned from Targeted Reviews...

    Broader source: Energy.gov (indexed) [DOE]

    Lessons Learned from Targeted Reviews of Fire Protection Programs at Department of Energy Nuclear Facilities August 2015 Office of Nuclear Safety and Environmental Assessments...

  8. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant - December 2014 Enterprise Assessments Review, Waste Isolation Pilot Plant - December 2014 December, 2014 Review of the Waste Isolation Pilot Plant ...

  9. Enterprise Assessments Salt Waste Processing Facility Construction...

    Office of Environmental Management (EM)

    Salt Waste Processing Facility Construction Quality and Fire Protection Systems Follow-up Review at the Savannah River Site - January 2016 Enterprise Assessments Salt Waste ...

  10. Enterprise Assessments Operational Awareness Record, Waste Isolation...

    Office of Environmental Management (EM)

    Record, Waste Isolation Pilot Plant - March 2015 Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015 Review of the Waste ...

  11. Mescalero Apache Tribe - Biomass Opportunity Assessment

    Broader source: Energy.gov (indexed) [DOE]

    USFS Stewardship contract * Escalating energy costs - Limited natural gas, mostly propane - Electricity from coop and IOU Project Tasks * Resource assessment * Energy loads ...

  12. Preliminary Assessment Review for Federal ESPCs | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Download the Preliminary Assessment Review. More Documents & Publications Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk, Responsibility, and ...

  13. Enterprise Assessments Review, West Valley Demonstration Project...

    Energy Savers [EERE]

    West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June 9-13, 2014. Enterprise Assessments Review, West Valley Demonstration Project - ...

  14. Enterprise Assessments Review, West Valley Demonstration Project...

    Broader source: Energy.gov (indexed) [DOE]

    management program at the West Valley Demonstration Project (WVDP) was conducted prior to ... Assessments Review, West Valley Demonstration Project - December 2014 (245.41 KB) ...

  15. Enterprise Assessments Operational Awareness Record, Argonne...

    Office of Environmental Management (EM)

    and New Brunswick Laboratory - March 2015 Enterprise Assessments Operational Awareness Record, Argonne National Laboratory and New Brunswick Laboratory - March 2015 March...

  16. NREL: Resource Assessment and Forecasting - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    email address: Your message: Send Message Printable Version Resource Assessment & Forecasting Home Capabilities Facilities Working with Us Research Staff Data & Resources Did...

  17. Moving Multifamily Buildings From Assessments to Upgrades

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Multifamily Peer Exchange Call: Moving Multifamily Buildings from Assessments to Upgrades, call slides and discussion summary, January 24, 2013.

  18. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 1, 2010 EA-1684: Final Environmental Assessment Construction And Operation Of The Facility For Rare Isotope Beams, Michigan State University, East Lansing, Michigan...

  19. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 29, 2011 EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric Drive Vehicle Battery and Component Manufacturing...

  20. City of Aspen- Energy Assessment Rebate Program

    Broader source: Energy.gov [DOE]

    The City of Aspen encourages interested residents and businesses to increase the energy efficiency of homes and offices through the Energy Assessment Program. Participating homes and offices must...

  1. Industrial Assessment Centers Help Students, Communities Learn...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Help Students, Communities Learn About Energy Efficiency Industrial Assessment Centers Help ... The Industrial Technologies Program (ITP) is part of the Department's Office of ...

  2. Global Forest Resource Assessment | Open Energy Information

    Open Energy Info (EERE)

    Assessment 2010 (FRA 2010) covers all seven thematic elements of sustainable forest management: Extent of forest resources Forest biological diversity Forest health and...

  3. Portsmouth and Paducah Construction Workers Needs Assessment

    Office of Environmental Management (EM)

    Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and ... uranium enriched in the uranium-235 isotope (U-235) to be used in the prodution of ...

  4. Uncertainties in global aerosol simulations: Assessment using...

    Office of Scientific and Technical Information (OSTI)

    Title: Uncertainties in global aerosol simulations: Assessment using three meteorological data sets Current global aerosol models use different physical and chemical schemes and 4 ...

  5. EA-1535: Final Programmatic Environmental Assessment | Department...

    Energy Savers [EERE]

    EA-1535: Final Programmatic Environmental Assessment Uranium Leasing Program Office of Legacy Management (LM) is evaluating its Uranium Leasing Program to determine a strategy for ...

  6. ARM - Publications: Science Team Meeting Documents: Assessing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessing interannual and spatial variability in cloud radiative forcing at the TWP and NSA ARM sites. Key, Erica University of Miami, RSMAS Minnett, Peter University of Miami The ...

  7. Industrial Assessment Centers: AMO Technical Assistance Overview

    Energy Savers [EERE]

    Industrial Assessment Centers: AMO Technical Assistance Overview John Smegal This presentation does not contain any proprietary, confidential, or otherwise restricted information. ...

  8. Office of Cyber Assessments | Department of Energy

    Energy Savers [EERE]

    evaluation of the effectiveness of classified and unclassified computer security ... for assessing the security of DOE classified and unclassified networks through ...

  9. National Geothermal Resource Assessment and Classification |...

    Broader source: Energy.gov (indexed) [DOE]

    will enable lower riskcost deployment of conventional and EGS geothermal power. USGS is also supporting GTP input to DOE National Energy Modeling by providing resource assessment...

  10. Pumping System Assessment Tool User Manual

    Broader source: Energy.gov [DOE]

    The Pumping System Assessment Tool (PSAT) user manual gives basic information about the data entry items, the calculated results, and assorted control button features.

  11. ARM - Publications: Science Team Meeting Documents: Assessing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessing the response of several GCMs to the McICA radiative transfer methodology Barker, Howard Meteorological Service of Canada Cole, Jason Meteorological Service of Canada...

  12. Supplemnental Volume - Independent Oversight Assessment of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Health, Safety and Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear ... Program EM Office of Environmental Management EM-1 ...

  13. Enterprise Assessments Lessons Learned from Targeted Reviews...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reviews of the Management of Safety Systems at ... April 2016 Office of Nuclear Safety and Environmental Assessments Office ... DOE safety and security programs by providing ...

  14. Mira Computational Readiness Assessment | Argonne Leadership...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INCITE Program 5 Checks & 5 Tips for INCITE Mira Computational Readiness Assessment ALCC Program Director's Discretionary (DD) Program Early Science Program INCITE 2016 Projects ...

  15. Innovative Exploration Techniques for Geothermal Assessment at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico ... geothermal exploration project in New Mexico since Fenton Hill at nearby Valles caldera. ...

  16. Environmental Assessments (EA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Buildings August 3, 2015 EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas July 31, 2015 EA-2000: Draft...

  17. Enterprise Assessments Review, Los Alamos National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    November 2014 Review of the Fire Protection Program at the Los Alamos National Laboratory The Department of Energy Office of Enterprise Assessments was established in May 2014 and...

  18. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  19. Assessing Climate Change Impacts, Vulnerability and Adaptation...

    Open Energy Info (EERE)

    Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability...

  20. Enterprise Assessments Review of Radioactive Waste Management...

    Energy Savers [EERE]

    Gaseous Diffusion Plant - December 2015 Enterprise Assessments Review of Radioactive Waste Management at the Portsmouth Gaseous Diffusion Plant - December 2015 December ...

  1. Enterprise Assessments - Operational Awareness Record of the...

    Energy Savers [EERE]

    Isolation Pilot Plant Horizon-14 Exercise - January 2015 Enterprise Assessments - Operational Awareness Record of the Observation of the Waste Isolation Pilot Plant Horizon-14 ...

  2. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Energy Savers [EERE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities ...

  3. Recommendations for the Preparation of Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition This second edition of the "Green Book" was issued by DOE to ...

  4. Colorado State University Industrial Assessment Center Saves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    small- and medium-sized manufacturing companies with no-cost energy assessments, while ... Through IAC assistance, manufacturers have saved Colorado companies more than 19 million ...

  5. PROJECT PROFILE: Degradation Assessment of Fielded CIGS Photovoltaic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Degradation Assessment of Fielded CIGS Photovoltaic Module Technologies PROJECT PROFILE: Degradation Assessment of Fielded CIGS Photovoltaic Module Technologies Funding ...

  6. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  7. EA-1974: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1974: Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Bonneville Power Administration ...

  8. Industrial Assessment Centers Update, Fall 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Assessment Centers Update, Fall 2015 Industrial Assessment Centers Update, Fall 2015 Read the Industrial Assessment Centers (IAC) Update, Fall 2015 Industrial Assessment Centers Update, Fall 2015 (477.91 KB) More Documents & Publications Industrial Assessment Centers (IAC) Update -- July 2015 Industrial Assessment Centers Quarterly Update, Spring 2014 IAC Fact Sheet Region 5

  9. Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies

    SciTech Connect (OSTI)

    Milbrandt, A.; Overend, R. P

    2008-11-01

    This survey of biomass resource assessments and assessment capabilities in Asia-Pacific Economic Cooperation (APEC) economies considered various sources: academic and government publications, media reports, and personal communication with contacts in member economies.

  10. Verizon Assessment Summary: DOE Assessment Identifies 30% Energy Savings for Broadband and Wireless Communication Company

    SciTech Connect (OSTI)

    2010-06-25

    This assessment summary describes how the industrial Technologies Program helped Verizon to find ways to improve the efficiency of its data center by performing a Save Energy Now energy assessment.

  11. Lucasfilm Assessment Summary: DOE Assessment Evaluates Energy Performance of Film and Entertainment Company Data Center

    SciTech Connect (OSTI)

    2010-06-25

    This assessment summary describes how the industrial Technologies Program helped Lucasfilm to find ways to improve the efficiency of its data center by performing a Save Energy Now energy assessment.

  12. Building a sustained climate assessment process

    SciTech Connect (OSTI)

    Buizer, James L.; Dow, Kirstin; Black, Mary E.; Jacobs, Katharine L.; Waple, Anne; Moss, Richard H.; Moser, Susanne; Luers, Amy; Gustafson, David I.; Richmond, T. C.; Hays, Sharon L.; Field, Christopher B.

    2015-09-21

    The leaders and authors of the Third US National Climate Assessment (NCA3) developed new modes of engaging academia, the private sector, government agencies and civil society to support their needs for usable, rigorous, and timely information and better connect science and decision-making. A strategic vision for assessment activities into the future was built during the NCA3 process, including recommendations on how to establish a sustained assessment process that would integrate evolving scientific understanding into decision making to manage the risks of climate change over time. This vision includes a collaborative assessment process that involves partnerships across a diverse and widely distributed set of non-governmental and governmental entities. The new approach to assessments would produce timely, scientifically sound climate information products and processes, rather than focusing on the production of single quadrennial synthesis reports. If properly implemented, a sustained assessment would be more efficient and cost-effective, avoiding the painful and time-consuming process of beginning the assessment process anew every 4 years. This ongoing assessment would also encourage scientific and social innovations and explore new insights and opportunities, building the capacity to advance the development and delivery of climate information to meet societal requirements and benefit from scientific opportunities.

  13. HANFORD SITE VEHICLE TRAFFIC SAFETY ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HANFORD SITE VEHICLE TRAFFIC SAFETY ASSESSMENT April 2010 Prepared for: Mission Support Alliance and U.S. Department of Energy - Richland Office Richland, Washington Prepared by: Transportation Solutions, Inc. 8350 165 th Ave Northeast, Suite 100 Redmond, Washington 98052 425-883-4134 tsinw.com Hanford Vehicle Safety Assessment FEBRUARY 2010 ii Table of Contents Executive Summary

  14. 1998 FFTF annual system assessment reports

    SciTech Connect (OSTI)

    Guttenberg, S.

    1998-03-19

    The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.

  15. Uncertainty in Integrated Assessment Scenarios

    SciTech Connect (OSTI)

    Mort Webster

    2005-10-17

    The determination of climate policy is a decision under uncertainty. The uncertainty in future climate change impacts is large, as is the uncertainty in the costs of potential policies. Rational and economically efficient policy choices will therefore seek to balance the expected marginal costs with the expected marginal benefits. This approach requires that the risks of future climate change be assessed. The decision process need not be formal or quantitative for descriptions of the risks to be useful. Whatever the decision procedure, a useful starting point is to have as accurate a description of climate risks as possible. Given the goal of describing uncertainty in future climate change, we need to characterize the uncertainty in the main causes of uncertainty in climate impacts. One of the major drivers of uncertainty in future climate change is the uncertainty in future emissions, both of greenhouse gases and other radiatively important species such as sulfur dioxide. In turn, the drivers of uncertainty in emissions are uncertainties in the determinants of the rate of economic growth and in the technologies of production and how those technologies will change over time. This project uses historical experience and observations from a large number of countries to construct statistical descriptions of variability and correlation in labor productivity growth and in AEEI. The observed variability then provides a basis for constructing probability distributions for these drivers. The variance of uncertainty in growth rates can be further modified by expert judgment if it is believed that future variability will differ from the past. But often, expert judgment is more readily applied to projected median or expected paths through time. Analysis of past variance and covariance provides initial assumptions about future uncertainty for quantities that are less intuitive and difficult for experts to estimate, and these variances can be normalized and then applied to mean

  16. Integrated assessment of global warming

    SciTech Connect (OSTI)

    Ott, K.O.

    1996-12-31

    The anomalies of sea surface temperatures, which show a warming trend since the 1850s through the decade 1960/70 of {Delta}SST {approximately} 0.3 C, are complemented by changes of the ground surface temperature ({Delta}GST). The global surface temperature change, based on these data, allows an integrated assessment of the associated increase in black-body irradiance and a comparison with the enhanced greenhouse-gas back-scattering. Information on the GST history is obtained from unfolding analyses of underground temperature distributions measured in 90 boreholes in Alaskan permafrost and Canadian bedrock. These analyses show GST increases ({Delta}GST) since the 19th century through 1960/70 of 3 C on average, with standard deviations of +1.8 C and {minus}0.9 C on the high and low end respectively. The onset of the warming trend, which is uncertain in the GST data, is timed more accurately by detailed length records of large valley glaciers in the US and the Alps. Evaluation of the heat capacities and heat transfer indicates that the temperature response to an increase in radiative forcing must be much larger on land than on the sea. Conversely, the observed large ratio of {Delta}GST and {Delta}SST can only be explained by increased radiative forcing. From 1960/70 through the warmest decade on record, 1980/90, global {Delta}SST and {Delta}SAT have further increased to 0.6 C and 0.8 C respectively, But, the most recent GST data are not accurate enough to extend the comparison through 1990. Calculation of the increase of radiative forcing from back-scattering of greenhouse gases for 1850 to 1970 yields 1.3 W/cm{sup 2}. The increase in black-body irradiance from 3.6 C warming on land and 0.3 C on sea provides the required balance. The warming on land of 3.6 C is larger than the average value of 3.0 C, but well within the observed range.

  17. Small Modular Reactors: Institutional Assessment

    SciTech Connect (OSTI)

    Joseph Perkowski, Ph.D.

    2012-06-01

    ? Objectives include, among others, a description of the basic development status of “small modular reactors” (SMRs) focused primarily on domestic activity; investigation of the domestic market appeal of modular reactors from the viewpoints of both key energy sector customers and also key stakeholders in the financial community; and consideration of how to proceed further with a pro-active "core group" of stakeholders substantially interested in modular nuclear deployment in order to provide the basis to expedite design/construction activity and regulatory approval. ? Information gathering was via available resources, both published and personal communications with key individual stakeholders; published information is limited to that already in public domain (no confidentiality); viewpoints from interviews are incorporated within. Discussions at both government-hosted and private-hosted SMR meetings are reflected herein. INL itself maintains a neutral view on all issues described. Note: as per prior discussion between INL and CAP, individual and highly knowledgeable senior-level stakeholders provided the bulk of insights herein, and the results of those interviews are the main source of the observations of this report. ? Attachment A is the list of individual stakeholders consulted to date, including some who provided significant earlier assessments of SMR institutional feasibility. ? Attachments B, C, and D are included to provide substantial context on the international status of SMR development; they are not intended to be comprehensive and are individualized due to the separate nature of the source materials. Attachment E is a summary of the DOE requirements for winning teams regarding the current SMR solicitation. Attachment F deserves separate consideration due to the relative maturity of the SMART SMR program underway in Korea. Attachment G provides illustrative SMR design features and is intended for background. Attachment H is included for overview

  18. Tiger Team Assessment of the Ames Laboratory

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This report documents the Tiger Assessment of the Ames Laboratory (Ames), located in Ames, Iowa. Ames is operated for the US Department of Energy (DOE) by Iowa State University. The assessment was conducted from February 10 to March 5, 1992, under the auspices of the Office of Special Projects, Office of the Assistant Secretary of Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing Environment, Safety, and Health (ES H) disciplines; management practices; and contractor and DOE self-assessments. Compliance with applicable Federal, State of Iowa, and local regulations; applicable DOE Orders; best management practices; and internal requirements at Ames Laboratory were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and the site contractor's management of ES H/quality assurance program was conducted.

  19. Facility Interface Capability Assessment (FICA) summary report

    SciTech Connect (OSTI)

    Viebrock, J.M.; Mote, N. ); Pope, R.B. )

    1992-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from the commercial facilities. In support of the development of the CRWMS, OCRWM sponsored the Facility Interface Capability Assessment (FICA) project. The objective of this project was to assess the capability of each commercial facility to handle various spent nuclear fuel shipping casks. The purpose of this report is to summarize the results of the facility assessments completed within the FICA project. The project was conducted in two phases. During Phase I, the data items required to complete the facility assessments were identified and the data base for the project was created. During Phase II, visits were made to 122 facilities on 76 sites to collect data and information, the data base was updated, and assessments of the cask-handling capabilities at each facility were performed.

  20. Nuclear Nonproliferation Ontology Assessment Team Final Report

    SciTech Connect (OSTI)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.