Powered by Deep Web Technologies
Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

PY;;:.Efh  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PY;;:.Efh PY;;:.Efh pau:) u.s. DEP.-\RTMENT OF ENERGY EERE PROJECT MANAG EM ENT CENTER NFPA DE11!Rl\fiNATION RECIPIENT :Daemen College STATE: NY PROJECf TITLE: Oaemen A1temative Energy/Geothermal Technologies Demonstration Program Erie County ~ . ~ Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number N/A DE·FG36-08G0088021/001 GFO-10-S2S G088021 Based on my review orehe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.iA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (sud"! as conceptual design or feaSibility studies. analytical energy supply

2

DOE/EA-1792S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S S DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado January 2013 DOE/EA-1792S i Draft - January 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device

3

Final Supplemental Environmental Assessment (EA-1792)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-S1 -S1 FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado March 2013 DOE/EA-1792-S1 i March 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device MSA Magnuson-Stevens Fishery Conservation Act

4

 

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H H Essential Fish Habitat (EFH) Assessment U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix H Essential Fish Habitat (EFH) Assessment Cape Wind Energy Project Final EFH Assessment Minerals Management Service for Consultation with the NOAA Fisheries January 2009 Appendix H Essential Fish Habitat (EFH) Assessment U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project i January 2009 Final EIS TABLE OF CONTENTS 1.0 INTRODUCTION ................................................................................................................................ 1-1 2.0 DESCRIPTION OF PROPOSED ACTION ......................................................................................

5

Scientific Analysis Is Essential to Assess Biofuel Policy Effects  

Science Conference Proceedings (OSTI)

Land-use change (LUC) estimated by economic models has sparked intense international debate. Models estimate how much LUC might be induced under prescribed scenarios and rely on assumptions to generate LUC values. It is critical to test and validate underlying assumptions with empirical evidence. Furthermore, this modeling approach cannot answer if any specific indirect effects are actually caused by biofuel policy. The best way to resolve questions of causation is via scientific methods. Kim and Dale attempt to address the question of if, rather than how much, market-induced land-use change is currently detectable based on the analysis of historic evidence, and in doing so, explore some modeling assumptions behind the drivers of change. Given that there is no accepted approach to estimate the global effects of biofuel policy on land-use change, it is critical to assess the actual effects of policies through careful analysis and interpretation of empirical data. Decision makers need a valid scientific basis for policy decisions on energy choices.

Kline, Keith L [ORNL; Oladosu, Gbadebo A [ORNL; Dale, Virginia H [ORNL; McBride, Allen [ORNL

2011-01-01T23:59:59.000Z

6

EFH Federal Agency Primer 11/98 A Primer for Federal Agencies  

E-Print Network (OSTI)

's recommendations. In addition, NMFS is required to comment on any state agency activities which would impact EFHEFH Federal Agency Primer 11/98 A Primer for Federal Agencies Essential Fish Habitat: New Marine Fish Habitat Conservation Mandate for Federal Agencies National Marine Fisheries Service Habitat

7

Aging assessment of essential HVAC chillers used in nuclear power plants  

SciTech Connect

The Pacific Northwest Laboratory conducted a comprehensive aging assessment of chillers used in the essential safety air-conditioning systems in nuclear power plants (NPPs). The chillers used, and air-conditioning systems served, vary in design from plant to plant. The review of operating experience indicated that chillers experience aging degradation and failures. The primary aging factors of concern for chillers include vibration, excessive temperatures and pressures, thermal cycling, chemical attack, and poor quality cooling water. The evaluation of Licensee Event Reports (LERs) indicated that about 38% of the failures were primarily related to aging, 55% were partially aging related, and 7% of the failures were unassignable. About 25% of the failures were primarily caused by human, design, procedure, and other errors. The large number of errors is probably directly related to the complexity of chillers and their interfacing systems. Nearly all of the LERs were the result of entering plant Technical Specification Limiting Condition for Operation (LCO) that initiated remedial actions like plant shutdown procedures. The trend for chiller-related LERs has stabilized at about 0.13 LERs per plant year since 1988. Carefully following the vendor procedures and monitoring the equipment can help to minimize and/or eliminate most of the premature failures. Recording equipment performance can be useful for trending analysis. Periodic operation for a few hours on a weekly or monthly basis is useful to remove moisture and non-condensable gases that gradually build up inside the chiller. Chiller pressurization kits are available that will help minimize the amount of moisture and air ingress to low-pressure chillers during standby periods. The assessment of service life condition monitoring of chillers indicated there are many simple to sophisticated methods available that can help in chiller surveillance and monitoring.

Blahnik, D.E.; Camp, T.W.

1996-09-01T23:59:59.000Z

8

Aging assessment of essential HVAC chillers used in nuclear power plants. Phase 1, Volume 1  

SciTech Connect

The Pacific Northwest Laboratory conducted a Phase I aging assessment of chillers used in the essential safety air-conditioning systems of nuclear power plants. Centrifugal chillers in the 75- to 750-ton refrigeration capacity range are the predominant type used. The chillers used, and air-conditioning systems served, vary in design from plant-to-plant. It is crucial to keep chiller internals very clean and to prevent the leakage of water, air, and other contaminants into the refrigerant containment system. Periodic operation on a weekly or monthly basis is necessary to remove moisture and noncondensable gases that gradually build up inside the chiller. This is especially desirable if a chiller is required to operate only as an emergency standby unit. The primary stressors and aging mechanisms that affect chillers include vibration, excessive temperatures and pressures, thermal cycling, chemical attack, and poor quality cooling water. Aging is accelerated by moisture, non-condensable gases (e.g., air), dirt, and other contamination within the refrigerant containment system, excessive start/stop cycling, and operating below the rated capacity. Aging is also accelerated by corrosion and fouling of the condenser and evaporator tubes. The principal cause of chiller failures is lack of adequate monitoring. Lack of performing scheduled maintenance and human errors also contribute to failures.

Blahnik, D.E.; Klein, R.F. [Pacific Northwest Lab., Richland, WA (United States)

1993-09-01T23:59:59.000Z

9

An Assessment of Industry Data Related to Essential Variables for Fusing High Density Polyethylene Pipe  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission has expressed concern about the essential variables used for fusing safety-related nuclear power plant piping systems constructed of high density polyethylene (HDPE). The essential variables detailed in the American Society of Mechanical Engineers (ASME) Code Case N-755-1, “Use of Polyethylene (PE) Plastic Pipe,” were considered to be incomplete. In addition, there were questions about using data in the Plastic Pipe Institute (PPI) report TR-33 ...

2013-07-31T23:59:59.000Z

10

NOAA Essential Fish Habitat Research Implementation Plan for Alaska for FY 2007 2011  

E-Print Network (OSTI)

, proposals must meet the EFH research priorities listed above and involve habitat for species managed under deadline By November 30 Proposal review By December 15 Prioritized list of proposals released When amount feeding area for proposed-endangered beluga whales. Possible site for LNG facility. Lower Cook Inlet

11

Essential Body of Knowledge (EBK)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of the Chief Information Officer (OCIO) utilized DOE cyber security policy, industry best practices and lessons learned, and comprehensive internal needs assessments to identify fundamental cyber security functional roles and associated responsibilities. In addition, core competencies were identified that represent the ‘core’ skill set needed by cyber security professionals to adequately fulfill their functional roles. This collective information was further used to define the Enterprise Essential Body of Knowledge (EBK).

12

DOE Essential Body of Knowledge | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Essential Body of Knowledge Essential Body of Knowledge DOE Essential Body of Knowledge DOE Essential Body of Knowledge & Core Competency Training The Office of the Chief Information Officer (OCIO) utilized DOE cybersecurity policy, best practices and lessons learned, and comprehensive internal needs assessments to identify fundamental cybersecurity functional roles and associated responsibilities to and define the essential body of knowledge (EBK) needed to support cybersecurity responsibilities and activities within the Department. Components of the EBK are assigned to each functional role, and customized curriculum is determined for each key role via core competency worksheets. The OCIO has determined the following roles to be key functional cyber roles within the Department:

13

Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Genetic Genetic Variability of Cell Wall Degradability for the Selection of Alfalfa with Improved Saccharification Efficiency Marc-Olivier Duceppe & Annick Bertrand & Sivakumar Pattathil & Jeffrey Miller & Yves Castonguay & Michael G. Hahn & Réal Michaud & Marie-Pier Dubé # Her Majesty the Queen in Right of Canada 2012 Abstract Alfalfa (Medicago sativa L.) has a high potential for sustainable bioethanol production, particularly because of its low reliance on N fertilizer. We assessed near-infrared reflec- tance spectroscopy (NIRS) as a high-throughput technique to measure cell wall (CW) degradability in a large number of lignified alfalfa stem samples. We also used a powerful immu- nological approach, glycome profiling, and chemical analyses to increase our knowledge of the composition of CW poly- saccharides of alfalfa stems with various levels

14

Characterization equipment essential drawing plan  

SciTech Connect

The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use.

WILSON, G.W.

1999-05-14T23:59:59.000Z

15

Supervisory Essentials | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Essentials Supervisory Essentials Supervisory Essentials February 24, 2014 8:30AM EST to February 27, 2014 4:30PM EST Registration link: CHRIS 002072/0038 $800.00 Course Type: Classroom Course Location: GTN A-410 Course Description: This course is designed to assist new first-line supervisors in developing the competencies they need to achieve their primary responsibilities, which include accomplishing the goals of their units through the work of their employees and ensuring that the work of their employees is of the highest possible quality. The course can also serve as a refresher for experienced supervisors and managers. This course addresses competencies in the following Executive Core Qualifications: Leading People, Leading Change, Building Coalitions, and Communication. The

16

Tank farms essential drawing plan  

SciTech Connect

The purpose of this document is to define criteria for selecting Essential Drawings, Support Drawings, and Controlled Print File (CPF) drawings and documents for facilities that are part of East and West Tank Farms. Also, the drawings and documents that meet the criteria are compiled separate listings. The Essential Drawing list and the Support Drawing list establish a priority for updating technical baseline drawings. The CPF drawings, denoted by an asterisk (*), defined the drawings and documents that Operations is required to maintain per the TWRS Administration Manual. The Routing Boards in Buildings 272-WA and 272-AW are not part of the CPF.

Domnoske-Rauch, L.A.

1998-08-04T23:59:59.000Z

17

Essential Body of Knowledge (EBK) October 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Essential Body of Knowledge (EBK) Essential Body of Knowledge (EBK) October 2011 1 U.S. DEPARTMENT OF ENERGY Essential Body of Knowledge (EBK) A Competency and Functional Framework For Cyber Security Workforce Development Office of the Chief Information Officer Office of the Associate CIO for Cyber Security October 2011 DOE Essential Body of Knowledge (EBK) October 2011 2 Table of Contents Executive Summary ...............................................................................................................4 DOE Essential Body of Knowledge (EBK) .........................................................................5 1.1 Data Security ..............................................................................................................6

18

Energy Education & Workforce Development: Energy Literacy: Essential...  

NLE Websites -- All DOE Office Websites (Extended Search)

Literacy: Essential Principles and Fundamental Concepts for Energy Education A thumbnail image of the cover of the Energy Literacy booklet. Download the guide: High Resolution Low...

19

The Need for Essential Consumer Protections  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Need for Essential Consumer Protections Need for Essential Consumer Protections THE NEED FOR ESSENTIAL CONSUMER PROTECTIONS SMART METERING PROPOSALS AND THE MOVE TO TIME-BASED PRICING August 2010 NCLC NATIONAL CONSUMER L AW C E N T E R ® ® The Need for Essential Consumer Protections Copyright © 2010 AARP, National Consumer Law Center, National Association of State Utility Consumer Advocates, Consumers Union, and Public Citizen. Reprinting with permission. ACkNOwLEDGMENTS The consumer organizations acknowledge the assistance of Barbara R. Alexander, Consumer Affairs Consultant, in the preparation of this paper. 1 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the

20

EPA CONTRACT NO  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 of 3 3 of 3 January 2009 MMS EIS-EA OCS Publication No. 2008-040 CAPE WIND ENERGY PROJECT Final Environmental Impact Statement U.S. Department of the Interior Minerals Management Service January 2009 Volume 3 of 3 MMS Table of Contents U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS VOLUME 2 Appendix A Figures, Maps and Tables Appendix B Agency Correspondence and Consultation Appendix C Draft Stormwater Pollution Prevention Plan Appendix D Draft Oil Spill Response Plan VOLUME 3 Appendix E Material Safety Data Sheets Appendix F Economic Model Appendix G Biological Assessment Appendix H Essential Fish Habitat (EFH) Assessment Appendix I Draft General Conformity Determination

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Heavy Vehicle Essential Power Systems Workshop  

DOE Green Energy (OSTI)

Essential power is a crosscutting technology area that addresses the efficient and practical management of electrical and thermal requirements on trucks. Essential Power Systems: any function on the truck, that is not currently involved in moving the truck, and requires electrical or mechanical energy; Truck Lights; Hotel Loads (HVAC, computers, appliances, lighting, entertainment systems); Pumps, starter, compressor, fans, trailer refrigeration; Engine and fuel heating; and Operation of power lifts and pumps for bulk fluid transfer. Transition from ''belt and gear driven'' to auxiliary power generation of electricity - ''Truck Electrification'' 42 volts, DC and/ or AC; All electrically driven auxiliaries; Power on demand - manage electrical loads; Benefits include: increased fuel efficiency, reduced emission both when truck is idling and moving down the road.

Susan Rogers

2001-12-12T23:59:59.000Z

22

INHIBITORY EFFECT OF ESSENTIAL OILS ON EXTRACELLULAR  

E-Print Network (OSTI)

Pityriasis capitis is a common scalp disorder caused by a fungus Malassezia globosa. The mechanism of Pityriasis capitis includes Malassezia-induced fatty acid metabolism, particularly lipase-mediated breakdown of sebaceous lipids and release of irritating free fatty acids. We report that extracellular lipase activity was detected in Malassezia globosa. The presence of lipase enzyme was performed in specific media on Petri dishes for formation of a zone.In this article, the effect of Cymbopogon citratus and Zingiber officinale essential oils on the extracellular lipase activity of Malassezia globosa had been studied by titrametric method. At the end of titration 4 µmol fatty acid/ml of reaction mixture was released in the presence of Cymbopogon citratus oil and 7µmol of fatty acid/ml of reaction mixture was liberated in the presence of Zingiber officinale oil. It was found that both essential oils strongly inhibit the lipase activity of M. globosa at a lower concentration.

Shubhangi Mugal; Ranjana Verma; Renu Mishra; Shikha Mandloi

2013-01-01T23:59:59.000Z

23

Heavy Vehicle Essential Power Systems Workshop  

SciTech Connect

Essential power is a crosscutting technology area that addresses the efficient and practical management of electrical and thermal requirements on trucks. Essential Power Systems: any function on the truck, that is not currently involved in moving the truck, and requires electrical or mechanical energy; Truck Lights; Hotel Loads (HVAC, computers, appliances, lighting, entertainment systems); Pumps, starter, compressor, fans, trailer refrigeration; Engine and fuel heating; and Operation of power lifts and pumps for bulk fluid transfer. Transition from ''belt and gear driven'' to auxiliary power generation of electricity - ''Truck Electrification'' 42 volts, DC and/ or AC; All electrically driven auxiliaries; Power on demand - manage electrical loads; Benefits include: increased fuel efficiency, reduced emission both when truck is idling and moving down the road.

Susan Rogers

2001-12-12T23:59:59.000Z

24

Solid-State Lighting: Text-Alternative Version: LED Essentials -  

NLE Websites -- All DOE Office Websites (Extended Search)

Essentials - Technology, Applications, Advantages, Disadvantages to someone Essentials - Technology, Applications, Advantages, Disadvantages to someone by E-mail Share Solid-State Lighting: Text-Alternative Version: LED Essentials - Technology, Applications, Advantages, Disadvantages on Facebook Tweet about Solid-State Lighting: Text-Alternative Version: LED Essentials - Technology, Applications, Advantages, Disadvantages on Twitter Bookmark Solid-State Lighting: Text-Alternative Version: LED Essentials - Technology, Applications, Advantages, Disadvantages on Google Bookmark Solid-State Lighting: Text-Alternative Version: LED Essentials - Technology, Applications, Advantages, Disadvantages on Delicious Rank Solid-State Lighting: Text-Alternative Version: LED Essentials - Technology, Applications, Advantages, Disadvantages on Digg

25

Essential Innovations Technology Corp | Open Energy Information  

Open Energy Info (EERE)

Technology Corp Technology Corp Jump to: navigation, search Name Essential Innovations Technology Corp Place Bellingham,, Washington State Zip 98225 Sector Geothermal energy, Services Product String representation "Manufactures an ... r applications." is too long. Coordinates 48.75235°, -122.471219° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.75235,"lon":-122.471219,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

ORAU: Environmental Assessments and Health Physics fact sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

agencies target contaminated sites across the country for decontamination and decommissioning, independent environmental assessment is essential to ensure the safety of those...

27

Essential proteins discovery from weighted protein interaction networks  

Science Conference Proceedings (OSTI)

Identifying essential proteins is important for understanding the minimal requirements for cellular survival and development. Fast growth in the amount of available protein-protein interactions has produced unprecedented opportunities for detecting protein ... Keywords: centrality, essential protein, protein interaction network

Min Li; Jianxin Wang; Huan Wang; Yi Pan

2010-05-01T23:59:59.000Z

28

Interim Stabilization Equipment Essential and Support Drawing Plan  

Science Conference Proceedings (OSTI)

This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.

KOCH, M.R.

2000-01-14T23:59:59.000Z

29

Interim Stabilization Equipment Essential and Support Drawing Plan  

SciTech Connect

This supporting document provides a list of the Essential and Support drawings for the Interim Stabilization project equipment.

KOCH, M.R.

2000-01-28T23:59:59.000Z

30

Probable essential thrombocythemia in a dog  

SciTech Connect

Essential thrombocythemia (ET), in an 11-year-old dog was characterized by persistently high platelet counts range, 4.19 X 10(6)/microliters to 4.95 X 10(6)/microliters, abnormal platelet morphology, marked megakaryocytic hyperplasia in the bone marrow, absence of circulating megakaryoblasts, and history of splenomegaly and gastrointestinal bleeding. Increased numbers of megakaryocytes and megakaryoblasts (15% to 20%) in the bone marrow were confirmed by a positive acetylcholinesterase reaction. Another significant finding was the presence of a basophilia in blood (4,836/microliters) and bone marrow. The marked persistent thrombocytosis, absence of reactive (secondary) thrombocytosis, abnormal platelet morphology, and quantitative and qualitative changes in the megakaryocytic series in the bone marrow suggested the presence of a myeloproliferative disease. Cytochemical and ultrastructural findings aided in the diagnosis of ET. The dog was treated with radiophosphorus. The results was a rapid decline in the numbers of megakaryoblasts and megakaryocytes in the bone marrow and platelets and basophils in the peripheral blood. The dog died unexpectedly of acute necrotizing pancreatitis and diabetes mellitus before a complete remission was achieved.

Hopper, P.E.; Mandell, C.P.; Turrel, J.M.; Jain, N.C.; Tablin, F.; Zinkl, J.G.

1989-04-01T23:59:59.000Z

31

Status Report, Essential System Functionality - January 2006 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Report on Essential System Functionality In 2004 and 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, performed ten evaluations of essential system functionality (ESF). These ESF reviews are highly technical, detailed engineering evaluations of selected essential systems within one or more facilities at each site. This report summarizes the observations and insights from these reviews. Although most essential safety systems that were reviewed were well maintained, tested, and operated, there were significant weaknesses in some aspects of engineering design and analysis that, for some safety systems,

32

Interim Stabilization Equipment Essential and Support Drawing Plan  

SciTech Connect

The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

KOCH, M.R.

1999-10-22T23:59:59.000Z

33

Interim Stabilization Equipment Essential and Support Drawing Plan  

Science Conference Proceedings (OSTI)

The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].

HORNER, T.M.

2000-10-16T23:59:59.000Z

34

CHEMICAL COMPOSITION OF THE ESSENTIAL OIL AND ETHER ...  

Science Conference Proceedings (OSTI)

essential oil from R. rugosum was investigated for further development and application. The chemical and class composition of the oils are presented in Table 1.

35

Understanding the essential work of fracture at the molecular level.  

E-Print Network (OSTI)

??xix, 138 leaves : ill. ; 30 cm HKUST Call Number: Thesis MECH 2006 Chen The essential work of fracture (EWF), a tool for characterizing… (more)

Chen, Haibin

2006-01-01T23:59:59.000Z

36

Solid-State Lighting: LED Essentials - Technology, Applications...  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications, Advantages, Disadvantages to someone by E-mail Share Solid-State Lighting: LED Essentials - Technology, Applications, Advantages, Disadvantages on Facebook Tweet...

37

The Evolution of Research and Education Networks and their Essential...  

NLE Websites -- All DOE Office Websites (Extended Search)

editors, IOS Press publisher The Evolution of Research and Education Networks and their Essential Role in Modern Science William JOHNSTON, Evangelos CHANIOTAKIS, Eli DART, Chin...

38

Politics and Emergency Medicine - An Essential Lesson for Every Resident  

E-Print Network (OSTI)

and guide the future of emergency medicine. Volume XII, no .s S ection Politics and Emergency Medicine - An EssentialMedicine, Department of Emergency Medicine, Orange, CA Every

2011-01-01T23:59:59.000Z

39

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well developed asset management implementation. Consequently an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in a risk assessment process. However, most proposed power delivery equipment risk models require for their successful application some probabilistic representation describing the chances of equipment ...

2012-12-14T23:59:59.000Z

40

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well-developed asset management implementation. Consequently, an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in the risk assessment process. However, for their application, most proposed power delivery equipment risk models require some probabilistic representation describing the chances of equipment failure. This re...

2011-12-21T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Opening up access to online documents using essentiality tracks  

Science Conference Proceedings (OSTI)

This paper discusses extensions to the previously developed "essentiality and proficiency" approach to increasing usability and accessibility of websites. The existing approach is introduced, as is a new application in the processing of Doc-Book XML ... Keywords: DocBook, XML, accessibility, essentiality, proficiency, usability, web

Matthew T. Atkinson; Jatinder Dhiensa; Colin H. C. Machin

2006-05-01T23:59:59.000Z

42

Essential Innovations Ekistics Town Planning Jiangsu Sifang Culture JV |  

Open Energy Info (EERE)

Ekistics Town Planning Jiangsu Sifang Culture JV Ekistics Town Planning Jiangsu Sifang Culture JV Jump to: navigation, search Name Essential Innovations, Ekistics Town Planning, & Jiangsu Sifang Culture JV Place China Sector Geothermal energy Product Announced in October 2006, this is a JV between Essential Innovation of Canada, Ekistics Town Planning also of Canada, and Jiangsu Sifang Culture Industry of China. The JV is to manufacture geothermal loop-field technology. References Essential Innovations, Ekistics Town Planning, & Jiangsu Sifang Culture JV[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Essential Innovations, Ekistics Town Planning, & Jiangsu Sifang Culture JV is a company located in China .

43

Essential Systems Functionality Inspection Criteria, Approach, and Lines of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Essential Systems Functionality Inspection Criteria, Approach, and Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although

44

ORISE: Environmental Assessment and Health Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessments and Health Physics Environmental Assessments and Health Physics Performing environmental assessments and independent verification is essential to building public trust and confidence in radiological cleanup. As the U.S. Department of Energy (DOE) and other government agencies target contaminated sites across the country for decontamination and decommissioning, strict guidelines must be followed to ensure that property is effectively remediated before being released for public or private use. Through a combination of environmental assessments, health physics services, and radiochemistry analyses, the Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessment and verification at DOE cleanup sites across the country. ORISE applies its

45

Wide Bandgap Semiconductors: Essential to Our Technology Future |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wide Bandgap Semiconductors: Essential to Our Technology Future Wide Bandgap Semiconductors: Essential to Our Technology Future Wide Bandgap Semiconductors: Essential to Our Technology Future January 15, 2014 - 8:00am Addthis Learn how wide bandgap semiconductors could impact clean energy technology and our daily lives. | Video by Sarah Gerrity and Matty Greene, Energy Department. Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? North Carolina State University will lead the Energy Department's new manufacturing innovation institute for the next generation of power electronics, focusing on wide bandgap (WBG) semiconductors. Building America's leadership in WBG semiconductor manufacturing while driving down the cost of the technology could lead to more affordable products for businesses and consumers, billions of dollars in energy

46

Supervisory Essentials: Strategies for Success! | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Essentials: Strategies for Success! Supervisory Essentials: Strategies for Success! Supervisory Essentials: Strategies for Success! September 11, 2013 8:30AM EDT to September 12, 2013 4:00PM EDT Registration link: CHRIS (002072/0037) $600 Course type: Classroom Course Location: DOE Headquarters, Forrestal Building, Washington, DC /Room 1E-245 Course Description: This course is designed to assist new first-line supervisors in developing the competencies they need to achieve their primary responsibilities, some of which include: Accomplishing the goals of their units through the work of their employees; ensuring that the work of their employees is of the highest possible quality. The course can also assist newly appointed managers as well as serve as a refresher for experienced supervisors and managers who would like a refresher. This

47

Redefining Customer Service is Essential to Modernizing Grid | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Redefining Customer Service is Essential to Modernizing Grid Redefining Customer Service is Essential to Modernizing Grid Redefining Customer Service is Essential to Modernizing Grid December 13, 2010 - 2:44pm Addthis Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability What does this mean for me? Utilities should be communicating to you about projects to modernize the grid that are effecting you. When was the last time you talked to your electricity provider about something besides a service or billing problem? Put another way, does your utility ask for your opinion on its plans for the future? Do you feel like your concerns are heard? There has been a lot of news lately about projects that focus on modernizing the electric grid, with some of it focused on legitimate

48

Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment  

Science Conference Proceedings (OSTI)

To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

NONE

1997-04-01T23:59:59.000Z

49

Time-bounded essential localization for wireless sensor networks  

Science Conference Proceedings (OSTI)

In many practical applications of wireless sensor networks, it is crucial to accomplish the localization of sensors within a given time bound. We find that the traditional definition of relative localization is inappropriate for evaluating its actual ... Keywords: essential localization, relative localization, time-bounded localization, wireless sensor networks

Wei Cheng; Nan Zhang; Xiuzhen Cheng; Min Song; Dechang Chen

2013-04-01T23:59:59.000Z

50

UMSL CHINA PROGRAM -Essential In-Country Information Program Coordinator  

E-Print Network (OSTI)

UMSL CHINA PROGRAM - Essential In-Country Information IN BEIJING Program Coordinator Dr. Rose Xinjuan Zhang, Associate Provost of International Programs Professor of Law, China Youth University of Political Science 25 No. West Third Ring Road Beijing 10008 P.R. China Phone: 86 10 8856 7101 Seasea

Crone, Elizabeth

51

The Need for Essential Consumer Protections: Smart metering proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

metering metering proposals and the move to time-based pricing. August 2010 The Need for Essential Consumer Protections: Smart metering proposals and the move to time-based pricing. August 2010 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems; (2) new digital metering systems for all customers; and (3) direct interfaces between the new metering systems and customers through inhome technologies. The Need for Essential Consumer Protections: Smart metering proposals and

52

Materials - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Assessment The staff of the Energy Systems Division has a long history of technical and economic analysis of the production and recycling of materials for transportation...

53

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

54

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

55

RADIOLOGICAL ASSESSMENT  

Office of Legacy Management (LM)

ASSESSMENT ASSESSMENT and STABILIZATION' SCENARIOS PARRERSBURG,'W. VA. SITE FEBRUARY 1980 M. CARSON J. COFFMAN N. MANDELTORT, ! Division of Nuclear Service Operations Chem-Nuclear\ Systems, Inc. 240 Stoneridge Dr., Suite 100 Columbia, South Carolina 29210 Prepared for AMAX Specialty Hetals Corporation One Greenwich Plaza Greenwich, Connecticut 06830 During July' 1978, Chem-Nuclear Systems, Inc. (CNSI) began an assessment program for AMAX Specialty Metals Corp."(AMAX) u to locate, quantify, and evaluate the'extent of environmental radioactive contamination at the AMAX Parkersburg., West Virginia former zirconium/hafnium processing facility. In addition, preliminary ive assessments were to be made to assist AMAX in evaluat ,ing alternat methods for site cleanup.

56

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

57

Rapid Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment Assessment of Lignin Content and Structure in Switchgrass (Panicum virgatum L.) Grown Under Different Environmental Conditions David G. J. Mann & Nicole Labbé & Robert W. Sykes & Kristen Gracom & Lindsey Kline & Isabella M. Swamidoss & Jason N. Burris & Mark Davis & C. Neal Stewart Jr. Published online: 13 October 2009 # Springer Science + Business Media, LLC. 2009 Abstract Switchgrass (Panicum virgatum L.) is a candi- date feedstock in bioenergy, and plant breeding and molecular genetic strategies are being used to improve germplasm. In order to assess these subsequent modifica- tions, baseline biomass compositional data are needed in a relevant variety of environments. In this study, switch- grass cv. Alamo was grown in the field, greenhouse, and growth chamber and harvested into individual leaf and stem tissue components. These components

58

Sleep Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Sleep Assessment Sleep Assessment 1 | Thank you for taking the time to complete this extensive form. Sleep disturbances and/or fatigue are most often the result of many factors. In order to best treat your condition we need to understand your symptoms and history. Please bring your completed assessment form to your appointment. To schedule an appointment please call 505 844-HBES (4237). Name: Employee ID#: Date: Male Female Age: Health Plan : United BCBSNM Other: Referred by: Sleep and Health History In general, would you describe your sleep as: Refreshing Not Refreshing How would you rate your sleep? Very Good Good Adequate Poor Very Poor How would you describe your sleep problem? Sleep Problem (indicate all that apply) Duration of problem

59

The Need for Essential Consumer Protections: Smart Metering Proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Metering Proposals and the Move to Time-Based Pricing The Need for Essential Consumer Protections: Smart Metering Proposals and the Move to Time-Based Pricing There is a widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded to handle not only load growth, but the integration of renewable resources and the potential for a significant increase in electric-powered vehicles. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems, designed to make the grid more reliable and capable of integrating renewable and local-level distribution

60

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

62

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

63

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

64

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

65

Healthful LipidsChapter 10 Essential Fatty Acid Metabolism to Self-Healing Agents  

Science Conference Proceedings (OSTI)

Healthful Lipids Chapter 10 Essential Fatty Acid Metabolism to Self-Healing Agents Health Nutrition Biochemistry eChapters Health - Nutrition - Biochemistry Press Downloadable pdf of Chapter 10 Essential Fatty A

66

Water UseWater Use ater is an essential part of life and an essential part of any farm. It is necessary for growing produce and often  

E-Print Network (OSTI)

. It is necessary for growing produce and often for cleaning produce before it is sold. Water may also be usedWater UseWater Use W ater is an essential part of life and an essential part of any farm to protect crops from frost or to apply fertilizers or pesticides. Ensuring that you have clean water

Liskiewicz, Maciej

67

Lifecycle Assessments and Sustainability Analyses | Open Energy Information  

Open Energy Info (EERE)

Lifecycle Assessments and Sustainability Analyses Lifecycle Assessments and Sustainability Analyses Jump to: navigation, search The National Renewable Energy Laboratory performs lifecycle and technoeconomic analyses to promote sustainable energy development. Conducting full life-cycle assessments for biomass products, including electricity, biodiesel, and ethanol, is important for determining environmental benefits. NREL analysts use a life-cycle inventory modeling package and supporting databases to conduct life-cycle assessments. These tools can be applied on a global, regional, local, or project basis. Integrated system analyses, technoeconomic analyses, life-cycle assessments (LCAs), and other analysis tools are essential to our research and development efforts. They provide an understanding of the economic,

68

616 Nonradioactive Dangerous Waste Storage Facility -- Essential/support drawing list. Revision 2  

SciTech Connect

This document identifies the essential and supporting engineering drawings for the 616 Nonradioactive Dangerous Waste Storage Facility. The purpose of the documents is to describe the criteria used to identify and the plan for updating and maintaining their accuracy. Drawings are designated as essential if they relate to safety systems, environmental monitoring systems, effluents, and facility HVAC, electrical, and plumbing systems. Support drawings are those which are frequently used or describe a greater level of detail for equipment, components, or systems shown on essential drawings. A listing of drawings identified as essential or support is provided in Table A.

Busching, K.R.

1994-09-29T23:59:59.000Z

69

The Essential Work of Fracture Method Applied to Mode II Interlaminar Fracture in Fiber Reinforced Polymers.  

E-Print Network (OSTI)

??This thesis presents a new method for determining mode II interlaminar fracture toughness in fiber reinforced polymers (FRP) using the essential work of fracture (EWF)… (more)

McKinney, Scott D

2013-01-01T23:59:59.000Z

70

Technical Qualification Program Self-Assessment Report - Livermore Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Livermore Livermore Field Office Technical Qualification Program Self-Assessment Report - Livermore Field Office The purpose of the Livermore Field Office (LFO) Teclmical Qualification Program (TQP) is to ensure that federal teclmical personnel with safety oversight responsibilities at defense nuclear facilities at Lawrence Livermore National Laboratory possess competence commensurate with responsibilities. LFO is committed to ensuring it has the necessary teclmical capabilities to provide the kind of management, direction, and guidance essential to safe operation ofDOE's defense nuclear facilities. LFO TQP Self-Assessment, May 2013 More Documents & Publications Technical Qualification Program Self-Assessment Report - Nevada Site Office Technical Qualification Program Self-Assessment Report - Sandia Site Office

71

Phytologia (April 2012) 94(1) 91 SEASONAL VARIATION IN THE LEAF ESSENTIAL OIL OF  

E-Print Network (OSTI)

Phytologia (April 2012) 94(1) 91 SEASONAL VARIATION IN THE LEAF ESSENTIAL OIL OF TAXODIUM DISTICHUM Robert_Adams@baylor.edu ABSTRACT The leaf essential oil of Taxodium distichum is dominated by -pinene (63-69%) with moderate amounts of limonene, - phellandrene, myrcene and -pinene. Oil yield increased from April (3.45 mg

Adams, Robert P.

72

Usingthe Essential Work of Fracture Method for Studying Physical Aging in Thin,  

E-Print Network (OSTI)

Usingthe Essential Work of Fracture Method for Studying Physical Aging in Thin, Ductile, Polymeric that impact properties change significantly after 30 days of aging at 50°C. To q u a n e this deleterious effect of aging, we did small-scale laboratory experi- ments using the essential work of fracture method

Nairn, John A.

73

Competition-regulation interface in telecommunications: What's left of the essential facility doctrine  

Science Conference Proceedings (OSTI)

The essential facility doctrine lies at the core of telecoms regulation since its very first steps in the United States and in the European Union. Later, the doctrine spread around the world and currently stands as a key pillar of the liberalization ... Keywords: Access policy, Broadband, Competition, Essential facilities, Next generation networks, Regulation, Telecommunications

Andrea Renda

2010-02-01T23:59:59.000Z

74

Integrated Environmental Assessment Part III: Exposure Assessment  

E-Print Network (OSTI)

of an Official ISEA Glossary,” Journal of Exposure AnalysisGeneva. IPCS (2001) Glossary of Exposure Assessment-Related

McKone, Thomas E.; Small, Mitchell J.

2006-01-01T23:59:59.000Z

75

Cyber Assessment Methods for SCADA Security | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Methods for SCADA Security Assessment Methods for SCADA Security Cyber Assessment Methods for SCADA Security This paper describes vulnerability assessment methodologies used in ongoing research and assessment activities designed to identify and resolve vulnerabilities so as to improve the security of the nation's critical infrastructure. The terrorist attacks of September 11, 2001 brought to light threats and vulnerabilities that face the United States. In response, the U.S. Government is directing the effort to secure the nation's critical infrastructure by creating programs to implement the National Strategy to Secure Cyberspace (1). One part of this effort involves assessing Supervisory Control and Data Acquisition (SCADA) systems. These systems are essential to the control of critical elements of our national

76

Solar radiation resource assessment  

DOE Green Energy (OSTI)

The bulletin discusses the following: introduction; Why is solar radiation resource assessment important Understanding the basics; the solar radiation resource assessment project; and future activities.

Not Available

1990-11-01T23:59:59.000Z

77

Many families of Caenorhabditis elegans microRNAs are not essential for development or viability  

E-Print Network (OSTI)

MicroRNAs (miRNAs) are approximately 23 nt regulatory RNAs that posttranscriptionally inhibit the functions of protein-coding mRNAs. We previously found that most C. elegans miRNAs are individually not essential for ...

Alvarez-Saavedra, Ezequiel

78

Waste and Encapsulation Storage Facility (WESF) Essential and Support Drawing List  

Science Conference Proceedings (OSTI)

The drawings identified in this document will comprise the Waste Encapsulation and Storage Facility essential and support drawing list. This list will replace drawings identified as the ''WESF Essential and support drawing list''. Additionally, this document will follow the applicable requirements of HNF-PRO-242 ''Engineering Drawing Requirements'' and FSP-WESF-001, Section EN-1 ''Documenting Engineering Changes''. An essential drawing is defined as an engineering drawing identified by the facility staff as necessary to directly support the safe operation or maintenance of the facility. A support drawing is defined as a drawing identified by the facility staff that further describes the design details of structures, systems, or components shown on essential drawings or is frequently used by the support staff.

SHANNON, W.R.

1999-08-31T23:59:59.000Z

79

Design criteria document, electrical system, K-Basin essential systems recovery, Project W-405  

Science Conference Proceedings (OSTI)

This Design Criteria Document provides the criteria for design and construction of electrical system modifications for 100K Area that are essential to protect the safe operation and storage of spent nuclear fuel in the K-Basin facilities.

Hoyle, J.R.

1994-12-12T23:59:59.000Z

80

Technical Qualification Program Self-Assessment Report - Livermore Field  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Qualification Program Self-Assessment Report - Livermore Technical Qualification Program Self-Assessment Report - Livermore Field Office Technical Qualification Program Self-Assessment Report - Livermore Field Office The purpose of the Livermore Field Office (LFO) Teclmical Qualification Program (TQP) is to ensure that federal teclmical personnel with safety oversight responsibilities at defense nuclear facilities at Lawrence Livermore National Laboratory possess competence commensurate with responsibilities. LFO is committed to ensuring it has the necessary teclmical capabilities to provide the kind of management, direction, and guidance essential to safe operation ofDOE's defense nuclear facilities. LFO TQP Self-Assessment, May 2013 More Documents & Publications Technical Qualification Program Self-Assessment Report - Pacific Northwest

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

LUser_CompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competency Assessments (Employee) Competency Assessments (Employee) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Participating in Competency Assessments (Employee) Purpose The purpose of this job aid is to guide users and supervisors through the step-by-step process of participating in a competency assessment by viewing gaps, assigning items, conducting a self- assessment, reviewing completed assessments, and viewing the competency history. View Gaps and Assign Items 6 Steps Task A Employee: Conduct Self Assessment 8 Steps Task B Employee: Review Completed Assessment - 6 Steps Task C Employee: View Competency History 11 Steps Task D SuccessFactors Learning v 6.4 User Job Aid Participating in Competency Assessments (Employee)

82

Essential Boundary Conditions with Straight C1 Finite Elements in Curved Domains  

SciTech Connect

The implementation of essential boundary conditions in C1 finite element analysis requires proper treatment of both the boundary conditions on second-order differentials of the solution and the curvature of the domain boundary. A method for the imposition of essential boundary conditions using straight elements (where the elements are not deformed to approximate a curved domain) is described. It is shown that pre-multiplication of the matrix equation by the local rotation matrix at each boundary node is not the optimal transformation. The uniquely optimal transformation is found, which does not take the form of a similarity transformation due to the non-orthogonality of the transformation to curved coordinates.

N.M. Ferraro, S.C. Jardin, X. Luo

2010-02-19T23:59:59.000Z

83

Solar Resource Assessment  

DOE Green Energy (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

84

Substation Site Assessment  

Science Conference Proceedings (OSTI)

Companies assess environmental conditions at their facilities as part of routine operations and in preparation of property transfers. This report and template provide a simple, efficient guide for assessing substation facilities.

2001-02-09T23:59:59.000Z

85

Updated Operations Assessment Guideline  

Science Conference Proceedings (OSTI)

The Operations Assessment Guideline (OAG) can be used to assess the organization and processes of operations departments. An internal utility team or third party can use this report to guide a team composed of industry experts and members of the assessed utility. This report is an update to EPRI report 1008520, Operations Assessment Guideline, published in March 2005. This improved version includes insights gained after three years of experience with the original report.

2008-03-25T23:59:59.000Z

86

Software project effort assessment  

Science Conference Proceedings (OSTI)

Software project assessments and postmortem analyses can increase the success of future projects and forthcoming project phases. However, although assessments and analyses are well-presented in the software engineering literature, they are short of descriptions ... Keywords: assessment, effort, final report, postmortem, project management, retrospective

Topi Haapio; Anne Eerola

2010-12-01T23:59:59.000Z

87

Abstract-Homing and navigation capabilities are essential for many Autonomous Underwater Vehicle  

E-Print Network (OSTI)

Abstract- Homing and navigation capabilities are essential for many Autonomous Underwater Vehicle, speed bias and underwater currents affect dead-reckoning measurements. All operation need to have INTRODUCTION Actually, there is a real challenge on application of Autonomous Underwater Vehicle, particularly

Paris-Sud XI, Université de

88

This issue of Briefings focuses on one essential element of all airports. Navigation  

E-Print Network (OSTI)

This issue of Briefings focuses on one essential element of all airports. Navigation aids navigational facilities that provide combined azimuth and glide slope guidance to a runway (pre- cision) and those that do not (nonprecision). Nonprecision refers to facilities without a glide slope and does

Minnesota, University of

89

Philosophy on Vulnerability Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

capabilities/vat/assess/ capabilities/vat/assess/ ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, 9700 South Cass Ave., Argonne, IL Philosophy on Vulnerability Assessments Argonne Vulnerability Assessment Team Roger G. Johnston, Ph.D., CPP , 630-252-6168 1. There are a number of conventional tools for finding security vulnerabilities. These include security surveys, risk management, design basis threat, CARVER Method, Delphi Method, software vulnerability assessment tools, infrastructure modeling, etc. 2. These tools have some value, and indeed we have used them all. 3. Experience has shown, however, that these methods do not usually result in dramatic improvements to security, nor do they reliably predict catastrophic security incidents that

90

System Assessment Standards: Defining the Market for Industrial Energy Assessments  

E-Print Network (OSTI)

2008. “System Assessment Standards: Defining the Market forL ABORATORY System Assessment Standards: Defining the Marketemployer. System Assessment Standards: Defining the Market

Sheaffer, Paul

2010-01-01T23:59:59.000Z

91

Cube assessment framework for B2C websites applied in a longitudinal study in the luxury fashion industry  

Science Conference Proceedings (OSTI)

A literature review of existing assessment frameworks for B2C websites over more than ten years reveals that they are all built bottom-up through an essentially empirical approach of recording functionalities/features without any theoretical construct ... Keywords: CUBE, assessment, branding, e-commerce, fashion, longitudinal, luxury, social media, web 2.0, website

Rina Hansen, Niels Bjørn-Andersen

2013-08-01T23:59:59.000Z

92

Program on Technology Innovation: Multi-Metering Technology Assessment  

Science Conference Proceedings (OSTI)

The essential concept of multi metering is to physically centralize the metering of electric service to multiple consumers so that a single communications module can serve all customers services with a single shared enclosure, power supply, memory, and computing capability. This report describes versions of multi metering currently on the market around the world. It assesses available and emerging multi-metering technologies, their possible applications in North America, and the comparative economics of ...

2008-11-17T23:59:59.000Z

93

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Memorandum , Part II. Screening Level Risk Assessment 92-225-161-49 K-33 Cooling Towers screening risk assessments (2) K-770 sites screening risk assessment (9...

94

Industrial Assessment Center  

SciTech Connect

The University of Dayton (UD) performed energy assessments, trained students and supported USDOE objectives. In particular, the UD Industrial Assessment Center (IAC) performed 96 industrial energy assessment days for mid-sized manufacturers. The average identified and implemented savings on each assessment were $261,080 per year and $54,790 per year. The assessments served as direct training in industrial energy efficiency for 16 UD IAC students. The assessments also served as a mechanism for the UD IAC to understand manufacturing energy use and improve upon the science of manufacturing energy efficiency. Specific research results were published in 16 conference proceedings and journals, disseminated in 22 additional invited lectures, and shared with the industrial energy community through the UD IAC website.

J. Kelly Kissock; Becky Blust

2007-04-17T23:59:59.000Z

95

Carotenoids & Retinoids; Molecular Aspects and Health IssuesChapter 3 The Essential Role of Vitamin A in Signal Transduction  

Science Conference Proceedings (OSTI)

Carotenoids & Retinoids; Molecular Aspects and Health Issues Chapter 3 The Essential Role of Vitamin A in Signal Transduction Health Nutrition Biochemistry eChapters Health - Nutrition - Biochemistry Press   ...

96

Evaluating the effects of essential oils and condensed tannin on fermentation and methane production under in vitro conditions.  

E-Print Network (OSTI)

??The effects of essential oils (EO) and condensed tannin (CT) on methane production and fermentation were evaluated under in vitro conditions. Experiment one screened the… (more)

Pinski, Brittany

2013-01-01T23:59:59.000Z

97

Nutrition and Biochemistry of PhospholipidsChapter 17 Essential Polyunsaturated Fatty Acids in Mothers and Their Neonates  

Science Conference Proceedings (OSTI)

Nutrition and Biochemistry of Phospholipids Chapter 17 Essential Polyunsaturated Fatty Acids in Mothers and Their Neonates Health Nutrition Biochemistry eChapters Health - Nutrition - Biochemistry AOCS Press Downloadable

98

Sustained activation of STAT5 is essential for chromatin remodeling and maintenance of mammary-specific function  

E-Print Network (OSTI)

specific transcription factors and chromatin modifiers. Molunique STAT5 targets by chromatin immunoprecipitation-basedSTAT5 is essential for chromatin remodeling and maintenance

Xu, Ren

2010-01-01T23:59:59.000Z

99

INDUSTRIAL ASSESSMENT CENTER PROGRAM  

Science Conference Proceedings (OSTI)

Since its establishment in 1990, San Diego State University’s Industrial Assessment Center (IAC) has served close to 400 small and medium-sized manufacturing plants in Southern California. SDSU/IAC’s efforts to transfer state-of-the-art technologies to industry have increased revenues, cultivated creativity, improved efficiencies, and benefited the environment. A substantial benefit from the program has been the ongoing training of engineering faculty and students. During this funding cycle, SDSU/IAC has trained 31 students, 7 of the graduate. A total of 92 assessments and 108 assessment days were completed, resulting in 638 assessment recommendations.

ASFAW BEYENE

2008-09-29T23:59:59.000Z

100

Industrial Energy Efficiency Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Energy Efficiency Assessments Lynn Price Staff Scientist China Energy Group Energy Analysis Department Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Industrial Energy Efficiency Assessments - Definition and overview of key components - International experience - Chinese situation and recommendations - US-China collaboration Industrial Energy Efficiency Assessments - Analysis of the use of energy and potential for energy efficiency in an industrial facility * Current situation * Recommendations for improving energy efficiency * Cost-benefit analysis of recommended options * An action plan for realizing potential savings Types of Industrial Energy Efficiency Assessments - Preliminary or walk-through - Detailed or diagnostic Audit criteria

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ORISE: Hazard Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and collaborators have, for example, conducted an assessment of health outcomes among nuclear technology workers at the RocketdyneAtomics International (AI) Santa Susana Field...

102

PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE  

E-Print Network (OSTI)

Disaster Preparedness, Response and Recovery #12;2 Louisiana State University Health Sciences CenterDISASTER PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE TOOLKIT (Disaster-PAST) Methods to Enhance

103

Condition and Life Assessment  

Science Conference Proceedings (OSTI)

Table 3   Regulations and standards on life assessment...to TRD 508 Italy ISPESL (1992). Components of steam generators and

104

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

105

Fluxes in ;Free; and Total Zinc Are Essential for Progression of Intraerythrocytic Stages of Plasmodium falciparum  

Science Conference Proceedings (OSTI)

Dynamic fluxes in the concentration of ions and small molecules are fundamental features of cell signaling, differentiation, and development. Similar roles for fluxes in transition metal concentrations are less well established. Here, we show that massive zinc fluxes are essential in the infection cycle of an intracellular eukaryotic parasite. Using single-cell quantitative imaging, we show that growth of the blood-stage Plasmodium falciparum parasite requires acquisition of 30 million zinc atoms per erythrocyte before host cell rupture, corresponding to a 400% increase in total zinc concentration. Zinc accumulates in a freely available form in parasitophorous compartments outside the food vacuole, including mitochondria. Restriction of zinc availability via small molecule treatment causes a drop in mitochondrial membrane potential and severely inhibits parasite growth. Thus, extraordinary zinc acquisition and trafficking are essential for parasite development.

Marvin, Rebecca G.; Wolford, Janet L.; Kidd, Matthew J.; Murphy, Sean; Ward, Jesse; Que, Emily L.; Mayer, Meghan L.; Penner-Hahn, James E.; Haldar, Kasturi; O; Halloran, Thomas V. (Michigan); (UWASH); (NWU); (Notre)

2012-10-23T23:59:59.000Z

106

Welding and Repair Technology Center: Essential and Emergency Service Water System Issues  

Science Conference Proceedings (OSTI)

Because of the numerous ASME Code and Regulatory (Nuclear Regulatory Commission) documents addressing operability and repair of through-wall leakage in class 2 and 3 systems, inconsistencies exist in their interpretation and application. This report is intended to summarize and clarify the current Code and Regulatory requirements and provisions applicable to operability and repair of essential and emergency service water systems with leakage through the pressure boundary.

2010-10-29T23:59:59.000Z

107

Tennessee Valley Authority/Bristol Tennessee Essential Services Smart Water Heater Pilot  

Science Conference Proceedings (OSTI)

This report describes the results and analysis of electric consumption (demand), demographic, and customer satisfaction data collected from Smart Water Heater Pilot participants in summer 2009. The demand response control and data collection are implemented using Carina Technology Inc.'s Water Heater Information Solution for Energy (WISE) units installed at 117 residential sites within Bristol Tennessee Essential Services’ operating territory. The results from this study provide insight into the data col...

2010-02-03T23:59:59.000Z

108

Design criteria document, Fire Protection Task, K Basin Essential Systems Recovery, Project W-405  

Science Conference Proceedings (OSTI)

The K Basin were constructed in the early 1950`s with a 20 year design life. The K Basins are currently in their third design life and are serving as a near term storage facility for irradiated N Reactor fuel until an interim fuel storage solution can be implemented. In April 1994, Project W-405, K Basin Essential Systems Recovery, was established to address (among other things) the immediate fire protection needs of the 100K Area. A Fire Barrier Evaluation was performed for the wall between the active and inactive areas of the 105KE and 105KW buildings. This evaluation concludes that the wall is capable of being upgraded to provide an equivalent level of fire resistance as a qualified barrier having a fire resistance rating of 2 hours. The Fire Protection Task is one of four separate Tasks included within the scope of Project W405, K Basin Essential systems Recovery. The other three Tasks are the Water Distribution System Task, the Electrical System Task, and the Maintenance Shop/Support Facility Task. The purpose of Project W-405`s Fire Protection Task is to correct Life Safety Code (NFPA 101) non-compliances and to provide fire protection features in Buildings 105KE, 105KW and 190KE that are essential for assuring the safe operation and storage of spent nuclear fuel at the 100K Area Facilities` Irradiated Fuel Storage Basins (K Basins).

Johnson, B.H.

1994-12-14T23:59:59.000Z

109

Current State Assessment  

Science Conference Proceedings (OSTI)

The report addresses the current state of design and management for protective relaying and substation control system products and installations in North America. Recently deployed protective relay design generations have been developed essentially as functional replacements for older electromechanical relays and have not necessarily taken advantage of their full potential. As utilities begin to deal with large deployments of these smart devices in a new regulatory and economic environment, they are stru...

2009-10-28T23:59:59.000Z

110

INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER  

SciTech Connect

The U. S. Department of Energy’s Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

MELINDA KRAHENBUHL

2010-05-28T23:59:59.000Z

111

Tidd PFBC Demonstration Project, A DOE Assessment  

Science Conference Proceedings (OSTI)

The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

National Energy Technology Laboratory

2001-08-31T23:59:59.000Z

112

Solar Radiation Resource Assessment Project. Program overview of fiscal year 1993  

DOE Green Energy (OSTI)

The mission of the Solar Radiation Resource Assessment Project is to provide essential information about the solar radiation resource to users and planners of solar technologies so that they can make informed and timely decisions concerning applications of those technologies. The project team accomplishes this by producing and disseminating relevant and reliable information about solar radiation. Topics include: Variability of solar radiation, measurements of solar radiation, spectral distribution of solar radiation, and assessment of the solar resource. FY 1993 accomplishments are detailed.

Not Available

1994-06-01T23:59:59.000Z

113

DOEEA-1203 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

114

SPAT 15 - Assessment  

Science Conference Proceedings (OSTI)

In the Spring of 1997, the Department of Energy's Department Standards Committee (DSC) convened a Standards Process Action Team (SPAT-15) to evaluate assessment processes within the DOE complex. If time and resources permitted, the team was also to evaluate assessment processes used by private industry conducting similar work and activities. The specific task statement was as follows: "Define the attributes of assessment programs that effectively support organizational feedback and improvement of safety systems at all the different levels of contractor and Department organizations." The team gathered information on existing assessment programs through surveys and presentations by representatives from national laboratories, processing facilities, and remediation sites. Examples of assessment programs described in this report encompass site-wide, individual facility, and task level applications within the DOE compIex

Bartley, J.C. (Coordinator)

1998-08-01T23:59:59.000Z

115

Comparison of vetiver root essential oils from cleansed (bacteria-and fungus-free) vs. non-cleansed  

E-Print Network (OSTI)

tissue culture derived and natural plants for both genotypes. Although oil yields differed, this may cultivars used for commercial essential oil production are `Sunshine' or very similar cultivars. This workComparison of vetiver root essential oils from cleansed (bacteria- and fungus-free) vs. non

Adams, Robert P.

116

Using behavioral measures to assess counter-terrorism training in the field  

Science Conference Proceedings (OSTI)

Development of behavioral pattern recognition and analysis skills is an essential element of counter-terrorism training, particularly in the field. Three classes of behavioral measures were collected in an assessment of skill acquisition during a US ... Keywords: behavioral observations, knowledge-skills-attitudes, profiling, scenarios, situational judgment tests, tracking

V. Alan Spiker; Joan H. Johnston

2011-07-01T23:59:59.000Z

117

Analyzing water supply in future energy systems using the TIMES Integrated Assessment Model (TIAM-FR)  

E-Print Network (OSTI)

Analyzing water supply in future energy systems using the TIMES Integrated Assessment Model (TIAM is required to maintain water supplies while water is essential to produce energy. However, the models and energy generally dealt with them separately, the two resources are highly interconnected. Energy

118

Integrated assessment briefs  

Science Conference Proceedings (OSTI)

Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

NONE

1995-04-01T23:59:59.000Z

119

Neutrino-Matter Interaction Rates in Supernovae: The Essential Microphysics of Core Collapse  

E-Print Network (OSTI)

Neutrino-matter interaction rates are central to the core collapse phenomenon and, perhaps, to the viability of the mechanism of core-collapse supernova explosions. In this paper we catalog and discuss the major neutrino scattering, absorption, and production processes that together influence the outcome of core collapse and the cooling of protoneutron stars. These are the essential inputs into the codes used to simulate the supernova phenomenon and an understanding of these processes is a prerequisite to continuing progress in supernova theory.

Adam Burrows; Todd A. Thompson

2002-11-18T23:59:59.000Z

120

PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3  

SciTech Connect

The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

Layfield, K.A.

1998-09-02T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Risk Assess - updated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Development Risk Assessment Software Development Risk Assessment Note: The purpose of this prompt list is to provide project managers with a tool for identifying and planning for potential project risks. It is process-based and supports the framework established by the DOE Software Engineering Methodology. It will be used within the stage exit process as an additional tool to ensure that the project manager has identified and is managing known risk factors. Additional detailed information describes the various risk factors and how to score them. Performing a risk assessment is an important step in being prepared for potential problems that can occur within any software project. During the risk assessment, if a potential risk is identified, a solution or plan of action should be developed. (A problem analyzed and planned

122

Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

123

FINAL ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

124

IAAP Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEEDS ASSESSMENT-DECEMBER 2001 NEEDS ASSESSMENT-DECEMBER 2001 Burlington Atomic Energy Commission Plant- Former Worker Program A US DOE funded project conducted by: Dr. Laurence Fuortes, Principal Investigator The University of Iowa College of Public Health Department of Occupational and Environmental Health 5 2940 Steindler Building Iowa City, IA 52242 TEL: 319 335 9819 FAX: 319 335 9200 BACEP-FWP Needs Assessment 1. INTRODUCTION In August of 2000, the University of Iowa College of Public Health initiated a needs assessment study to evaluate whether or not individuals formerly employed by the Department of Energy (DOE) at the Iowa Army Ammunition Plant (IAAP) near Burlington, Iowa, would benefit from a Former Worker Medical Surveillance Program. These workers were employed at IAAP in the atomic weapons industry on what was known at the facility as Line 1 or Division B at the

125

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

126

Bayesian Climate Change Assessment  

Science Conference Proceedings (OSTI)

A Bayesian fingerprinting methodology for assessing anthropogenic impacts on climate was developed. This analysis considers the effect of increased CO2 on near-surface temperatures. A spatial CO2 fingerprint based on control and forced model ...

L. Mark Berliner; Richard A. Levine; Dennis J. Shea

2000-11-01T23:59:59.000Z

127

Assessment of Phase Conductors  

Science Conference Proceedings (OSTI)

As transmission systems age, utilities are increasingly concerned about the reliability of aging conductors, especially ACSR conductors. Traditional methods for assessing conductors involve identifying the circuits that pose the greatest reliability risk and subjecting samples from suspect lines to tensile testing, but a range of corrosion detection methods have become available that increase the options available to utilities. This report describes several methods available for conductor assessment.

2009-12-23T23:59:59.000Z

128

Essential elements of modeling gas generation from well defined plutonium materials  

DOE Green Energy (OSTI)

Processing of excess plutonium oxide (and related) materials intended for long-term storage is addressed in DOE standard 3013-2000. The essential elements addressed by this standard are eliminating or reducing to an acceptable level the entities that lead to gas evolution and consequent pressurization of the intended storage container system. Based upon the need to adequately understand and quantify these relevant parameters we briefly describe the current scientific knowledge of gas evolution from such systems. These associated research efforts have included fundamental kinetic and thermodynamic studies of water interactions at actinide oxide surfaces, radiolytic reactions of adsorbed water, interfacial reactions of hydrogen and oxygen, and radiolytic helium production. Utilizing, where possible, experimental parameters for many of the aforementioned processes we have developed a mathematical model with a minimum number of essential components that successfully models gas generation from well-defined PuO{sub 2} materials with known amounts of deliberately added water. In this work we verify this model against real pressure versus time data (described at greater length in another manuscript in these conference proceedings) and subsequently assure the safety envelope of design criteria for both short- and long-term storage and transportation of these material classes. These modeling results predict pressures and gas phase mole fractions over well-defined DOE 3013 container test cases well in advance of actual long-term surveillance information and provide confidence in safe storage of plutonium oxide material classes.

Paffett, M. T. (Mark T.); Kelly, D. (Daniel)

2002-01-01T23:59:59.000Z

129

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

130

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

131

Luser_SupCompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

employee assessment, reviewing completed assessments, and viewing the competency history. Task A. View Gaps and Assign Items From the Home page, click the My Employees tab....

132

Second National Climate Assessment (2009)  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt What is the Second National Climate Assessment? The Second National Climate Assessment, entitled Global Change Impacts in the United States, was published in...

133

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

risk assessment information used to evaluate and remediate legacy contamination from the Manhattan Project. The RAIS was designed to provide all risk assessment processes in a...

134

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

135

Bioenergy Assessment Toolkit  

NLE Websites -- All DOE Office Websites (Extended Search)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte Produced under direction of the United States Agency for International Development by the National Renewable Energy Laboratory (NREL) under Interagency Agreement AEG-P-00-00003-00; Work for Others Agreement number 3010543; Task Numbers WFE2.1012, WFE2.1013, and WFE2.1014. Technical Report NREL/TP-6A20-56456 October 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 303-275-3000 * www.nrel.gov Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte

136

TECHNOLOGY READINESS ASSESSMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

137

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site August 1, 2009 U.S. Department of Energy; Office of Science; Office of Workforce Development for Teachers and Scientists (WDTS) System location - Pacific Northwest National Laboratory, Richland, WA Name of Information iPASS System for DOE Office of Science laboratory fellowship programs, including

138

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

139

Windows technology assessment  

SciTech Connect

This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

Baron, J.J.

1995-10-01T23:59:59.000Z

140

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Depamnf!l1tal Elel1l~nt&$ite july 23, 2009 Office of Information Resources Office of Management DOE Headquarters, Germantown, Germantown Computer Center Server Room Nameonl1fol'l11i1tion Sysleijlprl'f 'Project FOIAXpress ExhibitProj~tUID TBD NeWPIA ~ Update D Please indicate whether this is a new

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

HEPA Filter Vulnerability Assessment  

SciTech Connect

This assessment of High Efficiency Particulate Air (HEPA) filter vulnerability was requested by the USDOE Office of River Protection (ORP) to satisfy a DOE-HQ directive to evaluate the effect of filter degradation on the facility authorization basis assumptions. Within the scope of this assessment are ventilation system HEPA filters that are classified as Safety-Class (SC) or Safety-Significant (SS) components that perform an accident mitigation function. The objective of the assessment is to verify whether HEPA filters that perform a safety function during an accident are likely to perform as intended to limit release of hazardous or radioactive materials, considering factors that could degrade the filters. Filter degradation factors considered include aging, wetting of filters, exposure to high temperature, exposure to corrosive or reactive chemicals, and exposure to radiation. Screening and evaluation criteria were developed by a site-wide group of HVAC engineers and HEPA filter experts from published empirical data. For River Protection Project (RPP) filters, the only degradation factor that exceeded the screening threshold was for filter aging. Subsequent evaluation of the effect of filter aging on the filter strength was conducted, and the results were compared with required performance to meet the conditions assumed in the RPP Authorization Basis (AB). It was found that the reduction in filter strength due to aging does not affect the filter performance requirements as specified in the AB. A portion of the HEPA filter vulnerability assessment is being conducted by the ORP and is not part of the scope of this study. The ORP is conducting an assessment of the existing policies and programs relating to maintenance, testing, and change-out of HEPA filters used for SC/SS service. This document presents the results of a HEPA filter vulnerability assessment conducted for the River protection project as requested by the DOE Office of River Protection.

GUSTAVSON, R.D.

2000-05-11T23:59:59.000Z

142

Essential Role in Modern Science William E. Johnston, ESnet Adviser and Senior Scientist  

NLE Websites -- All DOE Office Websites (Extended Search)

Evolution of Research and Evolution of Research and Education Networks and their Essential Role in Modern Science William E. Johnston, ESnet Adviser and Senior Scientist Chin Guok, Evangelos Chaniotakis, Kevin Oberman, Eli Dart, Joe Metzger and Mike O'Conner, Core Engineering, Brian Tierney, Advanced Development, Mike Helm and Dhiva Muruganantham, Federated Trust Steve Cotter, Department Head wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science TERENA Networking Conference 2009 2 DOE Office of Science and ESnet - the ESnet Mission * The Office of Science (SC) is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for US research programs in high-energy

143

Teaming/Subcontracting Essential to Small Business Success Presented by: Tiki Dixon  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Teaming/Subcontracting Teaming/Subcontracting Essential to Small Business Success Presented by: Tiki Dixon Vice President, Tetra Tech Dating Opportunities with Large Business * Blind date * Caught my eye * Formal introduction Right time, right place 2 Building a Relationship with Large Business * Talking to the right person * Expectations of the relationship * Focusing on core company capabilities * Investing in the relationship Where are we going? 3 Engagement to Each Other * Building on a trusting relationship * Proven interest in each other * Ready for next step Send out invitations 4 Will you Marry Me? * Dating was successful * Engagement was great * Ready for formal/ informal relationship Next step ... Prime Contractor 5 Tetra Tech Mentor/Protégé Agreements

144

Rheological properties essential for the atomization of coal water slurries (CWS)  

SciTech Connect

During the previous quarter, it was noted that understanding the rheology of polymeric additives used in enhancing the stability of the CWS was essential in meeting the project objectives. Thus, further review of the literature was carried out to gain information on the rheology of polymeric additives, particularly at high shear rates. Philippoff and Hess [1] reported the existence of four distinct flow regions in the behavior of flow curve analysis of polymer solutions (Figure 1). These regions are characterized by (1) A Newtonian Region; (2) A non-Newtonian pseudoplastic region; (3) A second Newtonian region at high shear rates 10[sup 5] to 10[sup 6] sec[sup [minus]1]; (4) and a region of steepening slope identified as the onset of turbulence. Efforts during this past quarter were therefore directed towards the study of high shear rheology of the CWS.

Ohene, F.

1992-01-01T23:59:59.000Z

145

DOE Office of Indian Energy Tribal Renewable Energy Project Development and Financing Essentials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Renewable Energy Project Tribal Renewable Energy Project Development and Financing Essentials Introduction The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is responsible for assisting Tribes with energy planning and development, infrastructure, energy costs, and electrification of Indian lands and homes. As part of this commitment and on behalf of DOE, the Office of Indian Energy is leading education and capacity building efforts in Indian Country. 2 About the Speaker Elizabeth Doris * Senior Project Leader at the National Renewable Energy Laboratory (NREL) * Specializes in strategies for developing clean energy technologies in public and private markets * Project manager for the DOE Office of Indian Energy project team at NREL 3 Why Complete a Renewable Energy Project?

146

Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

147

Industrial Assessment Center  

SciTech Connect

Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

Dr. Diane Schaub

2007-03-05T23:59:59.000Z

148

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates32.doc More Documents & Publications EV Guideline Assessment Templates...

149

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates320.doc More Documents & Publications EV Guideline Assessment Templates...

150

Energy Efficiency Potential Assessment: (Appendices)  

Science Conference Proceedings (OSTI)

This document contains the appendices to EPRI Report 1008911, "Energy Efficiency Potential Assessment."

2003-07-28T23:59:59.000Z

151

Oak Ridge Reservation Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

152

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

153

Peer assessment using aropä  

Science Conference Proceedings (OSTI)

Aropä is a web-based peer assessment support tool that has been used extensively in a wide variety of settings over the past three years. We describe the design of Aropä and how it can be configured, and present some results from a research ...

John Hamer; Catherine Kell; Fiona Spence

2007-01-01T23:59:59.000Z

154

Packaged CHP System Assessment  

Science Conference Proceedings (OSTI)

The Packaged CHP System Assessment report provides an analysis of packaged combined heat and power (CHP) systems. The report summarizes and compares the technical characteristics of commercial product lines with electric power output up to 3,000 kWe.

2004-03-22T23:59:59.000Z

155

Geothermal industry assessment  

DOE Green Energy (OSTI)

An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

Not Available

1980-07-01T23:59:59.000Z

156

Supplemental Environmental Assessment  

E-Print Network (OSTI)

In 2007, the U.S. Department of the Navy (Navy) prepared the Environmental Assessment for the Disposal of Naval Activity Puerto Rico (2007 EA) to evaluate the potential environmental impacts associated with the disposal of Naval Activity Puerto Rico (NAPR) in accordance with the

unknown authors

2011-01-01T23:59:59.000Z

157

Crossarm Inspection and Assessment  

Science Conference Proceedings (OSTI)

Linemen frequently use wood pole inspection methods to inspect crossarms, and little work has been done to specifically address the inspection of wood, steel, or fiberglass crossarms. This report outlines the development of a test bed and associated protocols required to assess currently available and prospective inspection technologies and techniques for evaluation of in-service crossarms.

2009-12-23T23:59:59.000Z

158

Venetie, Alaska energy assessment.  

Science Conference Proceedings (OSTI)

This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

2013-07-01T23:59:59.000Z

159

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

160

National Climate Assessment: Production Team  

NLE Websites -- All DOE Office Websites (Extended Search)

NCA & Development Advisory Committee NCA & Development Advisory Committee Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Production Team Print E-mail National Climate Assessment Staff (USGCRP National Coordination Office) Current NCA Staff Dr. Fabien Laurier, Director, Third National Climate Assessment Dr. Glynis Lough, Chief of Staff for the National Climate Assessment Emily Therese Cloyd, Engagement Coordinator for the National Climate Assessment Bryce Golden-Chen, Program Coordinator for the National Climate Assessment Alison Delgado, Scientist Dr. Ilya Fischhoffkri, Scientist Melissa Kenney, Indicators Coordinator Dr. Fred Lipschultz, Regional Coordinator for the National Climate Assessment

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC  

Open Energy Info (EERE)

Assessments and Assessment Capabilities in APEC Assessments and Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Biomass Topics Resource assessment Website http://www.nrel.gov/internatio Country Australia, Brunei, Canada, Chile, China, Indonesia, Japan, South Korea, Malaysia, Mexico, New Zealand, Papua New Guinea, Peru, Philippines, Russia, Chinese Taipei, Thailand, United States, Vietnam Australia and New Zealand, South-Eastern Asia, Northern America, South America, Eastern Asia, South-Eastern Asia, Eastern Asia, Eastern Asia, South-Eastern Asia, Central America, Australia and New Zealand, Melanesia, South America, South-Eastern Asia, Eastern Europe, , South-Eastern Asia, Northern America, South-Eastern Asia

162

GIAC Security Essentials Certification (GSEC) Practical Assignment Version 1.4b  

E-Print Network (OSTI)

While working for a multinational Original Equipment Manufacturer as a network administrator, the internal network degraded during a worm attack, management wanted the network to be assessed. The network team had been assigned to conduct a risk assessment of our company’s internal network security. We started prioritizing the risks by classifying them as at high, medium and low. The team then recommended a few solutions to address these risks. After publishing the risk assessment report, the team identified a few areas to be fixed as soon as possible. First, the Wide Area Network (WAN) and Local Area Network (LAN) were not fully secured. Second, there was no separation of network services by function. Third, we audited the office environment and found Rogue Wireless Access Points connecting to the office network. Fourth, we found development labs network having many vulnerable workstations and servers. To start, we decided to secure our WAN and deploy IPSec VPN technology on top of a frame-relay PVC network with Quality of Service (QoS) Key fingerprint = AF19 FA27 2F94 998D FDB5 DE3D F8B5 06E4 A169 4E46

Jia Cherng Lee; Ded Fb E A E

2003-01-01T23:59:59.000Z

163

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

164

DOEM-1123 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEM-1123 DOEM-1123 Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washin%E E ~ U.S. Department of Energy Richland, Washington November 1995 DOE/EA - 1 123 ENVIRONMENTAL ASSESSMENT TRANSFER OF NORMAL AND LOW-ENRICHED URANIUM BILLETS TO THE UNITED KINGDOM HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY NOVEMBER 1995 This page intentionally left blank. U.S. Department of Energy Glossary Glossary Acronyms and Ini ti a1 isms ALARA BNFL CERL CFR CY DOE DOH DOT EA FR IAEA IMO I so LCF LEU LSA NAC NCRP NEA , NEPA PNL rem WAC WHC As Low As Reasonably Achievable British Nuclear Fuels Limited, Inc. Construction Engineering Resources Laboratory Code o f Federal Regulations Calendar Year

165

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

166

DOEEA-0984 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

167

Mercury Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED WITH COAL-FIRED POWER PLANTS: IMPACTS OF LOCAL DEPOSITIONS *T.M. Sullivan 1 , F.D. Lipfert 2 , S.M. Morris 2 , and S. Renninger 3 1 Building 830, Brookhaven National Laboratory, Upton, NY 11973 2 Private Consultants 3 Department of Energy, National Energy Technology Laboratory, Morgantown, WV ABSTRACT The U.S. Environmental Protection Agency has announced plans to regulate emissions of mercury to the atmosphere from coal-fired power plants. However, there is still debate over whether the limits should be placed on a nationwide or a plant-specific basis. Before a nationwide limit is selected, it must be demonstrated that local deposition of mercury from coal-fired power plants does not impose an excessive local health risk. The principal health

168

EV Guideline Assessment Templates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates |1. Process: Organization |2. Guideline No: 1|3. Contractor: |4.Contract/project(s): | ||||| ||||| |5. Guideline Statement: Define the authorized work elements for the program. A work breakdown structure (WBS), tailored for effective internal management control, is commonly used in this process. | || |6. Documentation Required: 1) CLINs 2) WBS 3) WBS Dictionary | || || || |7. Instructions: Why this is important: The WBS represents the entire scope of work in the project, a "picture" of the work. The first level is the total system, and it continues down in successively smaller elements until it reaches the level of detail necessary for management action and control. This picture of the work is needed to facilitate traceability, ensure the

169

DOEEA-1177 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Environmental Assessment SalvageDemolition of 200 West Area, 200 East Area and 300 Area Steam Plants, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington October 1996 DOE/EA-1177 ENVIR0NMEN"AL ASSESSMENT' FOR THE SALVAGE/DEMOLITION OF 200 WEST AREA, '200 EAST AREA, AND 300 AREA STEAM PLANTS U . S . DEPARTMENT OF ENERGY RICHLAND, WASHINGTON OCTOBER 1996 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available origid document. DOE/EA- 1177 U.S. Department o f Energy Preface Appendices. Additional information necessary t o support an understanding of the proposed action, a1 ternati ves , and potenti a1 impacts i s provided. Comments resul ti.ng from review o

170

Guidelines for Exposure Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Z-92/001 Z-92/001 May 1992 Guidelines for Exposure Assessment Published on May 29, 1992, Federal Register 57(104):22888-22938 These guidelines replace the previously issued final Guidelines for Estimating Exposures (September 24, 1986), Federal Register 51(185):34042-34054, and the Proposed Guidelines for Exposure-Related Measurements (December 2, 1988), Federal Register 53(232):48830- 48853. Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Note: This document represents the final guidelines. A number of editorial corrections have

171

National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Production Team Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Overview Print E-mail What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

172

needs_assessment.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Office Needs Assessment Workshop Education Office Needs Assessment Workshop On October 2, 40 educators from 15 school districts met at Fermilab to discuss the status of science education in the context of state and national frameworks. Districts were selected at random from DuPage and Kane counties, and superintendents selected a team to represent the district at the workshop. The group provided input to the Education Office regarding future program direction. Over the next few months the Education Office will be reviewing program offerings in light of the issues raised below. In the meantime, we invite you to visit the Teacher Resource Center which serves as our clearinghouse or call Susan Dahl at 630-840-3094 for assistance. If you would like a scientist to visit your classroom, participate in a career fair or serve as

173

Oil Market Assessment  

Gasoline and Diesel Fuel Update (EIA)

Logo Oil Market Assessment - September Logo Oil Market Assessment - September 12, 2001 EIA Home Page Based on Energy Information Administration (EIA) contacts and trade press reports, overall U.S. and global oil supplies appear to have been minimally impacted by yesterday's terrorist attacks on the World Trade Center and the Pentagon. Rumors of scattered closures of U.S. refineries, pipelines, and terminals were reported, and Louisiana Offshore Oil Port operations were partially suspended. While the NYMEX and New York Harbor were temporarily closed, operations are expected to resume soon. Most, if not all petroleum industry infrastructure is expected to resume normal operations today or in the very near term. Prices at all levels (where markets were open) posted increases yesterday, but many prices fell today, as initial reactions

174

Pantex Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Needs Assessment Pantex Needs Assessment Phase I Summary and Recommendation Based upon the availability of information to access former workers, and given the knowledge regarding past exposures to hazardous agents, it is recommended that a Phase II examination program be established for former Pantex workers. This will be in keeping with other DOE mandates and programs, and will assist with the current DOE compensation program. I. Introduction and Background The Department of Energy has established a program to meet the medical oversight needs of former workers who worked at a variety of Department of Energy facilities in connection with the nuclear programs of the United States. It has been recognized that these workers might have been exposed to potentially hazardous materials, and that they were deserving of medical

175

Boiler Condition Assessment Guideline  

Science Conference Proceedings (OSTI)

This report Boiler Condition Assessment Guideline provides a concise overview of procedures developed by the Electric Power Research Institute EPRI to help power plant operators cost-effectively determine the extent of degradation and remaining life of key boiler components. The Guideline draws from EPRIs detailed area-specific guidelines, which in turn are based on extensive research findings by EPRI, member companies, and other organizations. This Guideline offers a starting point for power plant perso...

2010-12-23T23:59:59.000Z

176

Protective Coatings Assessment  

Science Conference Proceedings (OSTI)

This report describes assessments of ceramic and thermal spray coatings that have advanced significantly or recently been marketed for use in the utility boiler industry to reduce slagging, mitigate fireside corrosion and potentially, circumferential cracking due to cyclic temperature variations. These innovations promise to enhance coating quality as well as reduce time and labor required to protect large areas of the boiler waterwalls. Coatings may also enable plants to improve production rates; thereb...

2011-12-22T23:59:59.000Z

177

Draft Risk Assessment Processes  

Science Conference Proceedings (OSTI)

A cyber security risk assessment process includes the characterization of assets. A thorough asset characterization process can lead to a more robust threat characterization. One means of enhancing the thoroughness of the asset-and-threat characterization processes is to improve the characterization mechanisms. This technical update supports this approach by providing the results of initial research and developing a framework to support further analysis.This project builds upon the work ...

2012-12-28T23:59:59.000Z

178

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

179

Aging Cable Assessment Guideline  

Science Conference Proceedings (OSTI)

Medium- and low-voltage cables have provided reasonable service in power plants. However, there is a concern that cables that have experienced long periods of stressed service and especially wet service might degrade and fail in service. Because most plants have had few problems with cables, little on-staff experience with cables exists at most sites. This report provides information that will be of practical use when assessing cable longevity in adverse environments and service conditions that may ...

2013-12-17T23:59:59.000Z

180

Field Guide: Coatings Assessment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has numerous products to help plant personnel meet the challenges of working with aging systems, structures, and components, but none that comprehensively address protective coatings and linings. This field guide provides a compilation of protective coating and lining information in a form that allows the user to have a ready reference available during condition assessment of the various protective coatings and linings used in the plant.

2012-05-14T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Assessment summary, Jan. 2004  

E-Print Network (OSTI)

and internal use as focal point) Draft “consideration of use” battery Rewrite paper expanding Research & Network models SQW meeting in Cambridge SIKE/Assessment: 3 to 5 months Lessons learned from Connections - briefings First implementation of IRO at CU... support letters from ONE & Scotland Coordination meeting of Cummings/Horner/Tanner SIKE & KICs: 3 Greitzer meetings planned Innovation Centre: Set BT/CW priorities for March/April events Brief CMI management (What was said to Davies, Aldridge...

182

Assessment and Outlook  

E-Print Network (OSTI)

My assignment at this conference is to assess where we are in high-energy physics and speculate on where we might be going. This frees me from any obligation to summarize all that went on here and allows me to talk just about those topics that interest me the most at this time. I will let my prejudices show and talk a bit about physics in general, CP violation, neutrinos, accelerators, non-accelerator experiments, and even theory.

Burton Richter

2000-01-04T23:59:59.000Z

183

MANAGEMENT ASSESSMENT AN INTEGRATED ENVIRONMENT SAFETY & HEALTH MANAGEMENT SYSTEM (ISMS) CORE FUNCTION FOR FEEDBACK & CONTINUOUS IMPROVEMENT  

Science Conference Proceedings (OSTI)

Management assessment is required of US Department of Energy contractors by 10 CFR 830.122 and DOE Order 414.1. The management assessment process is a rigorous, preplanned, forward-looking review. It is required to be performed by owners of the processes that are being assessed. Written from the perspective of the Assessment Program Director and an Assessment Specialist, this paper describes the evolution of the process used by CH2MHILL to implement its management assessment program over the past two years including: roles, responsibilities, and details about our program improvement project designed to produce a clear picture of management processes and to identify opportunities for improvement. The management assessment program is essential to successful implementation, maintenance, and improvement of the CH2MHILL Integrated Environment, Safety, and Health Management System (ISMS). The management assessment program implements, in part, ISMS Core Function No. 5. ''Feedback and Continuous Improvement''. Organizations use the management assessment process to assess ISMS implementation and effectiveness. Management assessments evaluate the total picture of how well management processes are meeting organizational objectives and the customer's requirements and expectations. The emphasis is on management issues affecting performance, systems, and processes such as: strategic planning, qualification, training, staffing, organizational interfaces, communication, cost and schedule control and mission objectives. Management assessments should identify any weaknesses in the management aspects of performance and make process improvements. All managers from first line supervisors to the president and general manager are involved in the management assessment process. More senior managers, in conducting their assessment, will use data from lower levels of management. This approach will facilitate the objective of having managers closer to the work under review focusing on more compliance- and process-oriented aspects of work performance, while senior managers will concentrate on more strategic issues, having more access to information generated from assessments by their subordinates.

VON WEBER, M.

2005-07-26T23:59:59.000Z

184

Essential role of Chk1 in S phase progression through regulation of RNR2 expression  

Science Conference Proceedings (OSTI)

Chk1 is an essential kinase for maintaining genome integrity and cell cycle checkpoints through phosphorylating several downstream targets. Recently, we demonstrated that Chk1 is also required for cell proliferation in somatic cells under unperturbed condition through regulating transcription of several genes. Here, we show that Chk1 is required for S phase progression and RNR2 is a critical downstream target of genes transcriptionally regulated by Chk1. Hence, although RNR2 expression reached maximum at S phase in the presence of Chk1, Chk1 depletion arrested the cell cycle at S phase and reduced RNR2 expression at both mRNA and protein levels. Ectopic expression of RNR2 failed to rescue the S phase arrest observed in Chk1 depleted cells, suggesting the presence of an additional Chk1-target(s) for completion of S phase other than RNR2. Therefore, our results suggest that Chk1 is required for DNA replication at least through regulating RNR2 gene transcription.

Naruyama, Hiromichi [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Department of Urology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Shimada, Midori; Niida, Hiroyuki; Zineldeen, Doaa H. [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Hashimoto, Yoshihiro; Kohri, Kenjiro [Department of Urology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan); Nakanishi, Makoto [Department of Cell Biology, Graduate School of Medical Sciences, Nagoya City University, 1 Kawasumi, Mizuho-cho, Mizuho-ku, Nagoya 467-8601 (Japan)], E-mail: mkt-naka@med.nagoya-cu.ac.jp

2008-09-12T23:59:59.000Z

185

Structure and assembly of the essential RNA ring component of a viral DNA packaging motor  

SciTech Connect

Prohead RNA (pRNA) is an essential component in the assembly and operation of the powerful bacteriophage {psi}29 DNA packaging motor. The pRNA forms a multimeric ring via intermolecular base-pairing interactions between protomers that serves to guide the assembly of the ring ATPase that drives DNA packaging. Here we report the quaternary structure of this rare multimeric RNA at 3.5 {angstrom} resolution, crystallized as tetrameric rings. Strong quaternary interactions and the inherent flexibility helped rationalize how free pRNA is able to adopt multiple oligomerization states in solution. These characteristics also allowed excellent fitting of the crystallographic pRNA protomers into previous prohead/pRNA cryo-EM reconstructions, supporting the presence of a pentameric, but not hexameric, pRNA ring in the context of the DNA packaging motor. The pentameric pRNA ring anchors itself directly to the phage prohead by interacting specifically with the fivefold symmetric capsid structures that surround the head-tail connector portal. From these contacts, five RNA superhelices project from the pRNA ring, where they serve as scaffolds for binding and assembly of the ring ATPase, and possibly mediate communication between motor components. Construction of structure-based designer pRNAs with little sequence similarity to the wild-type pRNA were shown to fully support the packaging of {psi}29 DNA.

Ding, Fang; Lu, Changrui; Zhao, Wei; Rajashankar, Kanagalaghatta R.; Anderson, Dwight L.; Jardine, Paul J.; Grimes, Shelley; Ke, Ailong (Cornell); (UMM)

2011-07-25T23:59:59.000Z

186

Neutron spectrometry - An essential tool for diagnosing implosions at the National Ignition Facility  

Science Conference Proceedings (OSTI)

DT neutron yield (Y{sub n}), ion temperature (T{sub i}) and down-scatter ratio (dsr) determined from measured neutron spectra are essential metrics for diagnosing the performance of Inertial Confinement Fusion (ICF) implosions at the National Ignition Facility (NIF). A suite of neutron-Time-Of-Flight (nTOF) spectrometers and a Magnetic Recoil Spectrometer (MRS) have been implemented in different locations around the NIF target chamber, providing good implosion coverage and the redundancy required for reliable measurements of Yn, Ti and dsr. From the measured dsr value, an areal density ({rho}R) is determined from the relationship {rho}R{sub tot} (g/cm{sup 2}) = (20.4 {+-} 0.6) x dsr{sub 10-12 MeV}. The proportionality constant is determined considering implosion geometry, neutron attenuation and energy range used for the dsr measurement. To ensure high accuracy in the measurements, a series of commissioning experiments using exploding pushers have been used for in situ calibration. The spectrometers are now performing to the required accuracy, as indicated by the good agreement between the different measurements over several commissioning shots. In addition, recent data obtained with the MRS and nTOFs indicate that the implosion performance of cryogenically layered DT implosions, characterized by the experimental Ignition Threshold Factor (ITFx) which is a function of dsr (or fuel {rho}R) and Y{sub n}, has improved almost two orders of magnitude since the first shot in September, 2010.

Mackinnon, A J; Johnson, M G; Frenje, J A; Casey, D T; Li, C K; Seguin, F H; Petrasso, R; Ashabranner, R; Cerjan, C; Clancy, T J; Bionta, R; Bleuel, D; Bond, E J; Caggiano, J A; Capenter, A; Eckart, M J; Edwards, M J; Friedrich, S; Glenzer, S H; Haan, S W; Hartouni, E P; Hatarik, R; Hachett, S P; McKernan, M; Jones, O; Lepape, S; Lerche, R A; Landen, O L; Moran, M; Moses, E; Munro, D; McNaney, J; Rygg, J R; Sepke, S; Spears, B; Springer, P; Yeamans, C; Farrell, M; Kilkenny, J D; Nikroo, A; Paguio, R; Knauer, J; Glebov, V; Sangster, T; Betti, R; Stoeckl, C; Magoon, J; Shoup, M J; Grim, G P; Moran, G L; Murphy, T J; Leeper, R J; Ruiz, C

2012-05-02T23:59:59.000Z

187

Remote sensing for geothermal environmental assessments. Final report  

DOE Green Energy (OSTI)

The role of remote sensing is examined in the context of the DOE Environmental Assessment Studies. Particular attention has been paid to the exploitation, by computer analysis, of low altitude aerial photographs, which had been made available for this project. One technique, change detection - developed during this project - has been found to be particularly useful, because it permits to detect environmental changes at a very early stage where it might escape detection on the ground. This technique, which has now been perfected to be usable on a routine basis, can thus provide a very effective environmental early warning capability. Several examples are shown in known Geothermal Resource Areas (KGRA's) in the Imperial Valley and the Geysers, California, which lead to the conclusion that remote sensing should become an essential tool for the Environmental Assessment Studies.

Frei, W.; Shibata, T.; Huth, G.C.

1979-06-30T23:59:59.000Z

188

Integrated Assessment | Open Energy Information  

Open Energy Info (EERE)

Integrated Assessment Integrated Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Integrated Assessment: Mainstreaming sustainability into policymaking--A guidance manual Agency/Company /Organization: United Nations Environment Programme Topics: Background analysis Website: www.unep.ch/etb/publications/AI%20guidance%202009/UNEP%20IA%20final.pd Equivalent URI: cleanenergysolutions.org/content/times-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance References: Integrated Assessment[1] The Times Integrated Assessment Model (TIAM) comprises several thousand technologies in all sectors of the energy system. It is characterized by several technical and economic parameters and by emission coefficients for

189

Process Management Maturity Assessment Process Management Maturity Assessment  

E-Print Network (OSTI)

This paper outlines a Business Process Management implementation approach in a large international company. It introduces a Process Management Maturity Assessment (PMMA) which was developed to assess the implementation of Business Process Management. The maturity model is based on the assessment of nine categories which comprehensively cover all aspects which impact the success of Business Process Management. Some findings of the first assessment round are presented to illustrate the benefits of the PMMA approach.

Michael Rohloff; Michael Rohloff

2009-01-01T23:59:59.000Z

190

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

191

Uncertainties in energy technology assessments  

E-Print Network (OSTI)

In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

Coate, David

1980-01-01T23:59:59.000Z

192

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Debra Stewart at (865)482-2657 or dthomas3@utk.edu. Risk assessments conducted for the DOE-ORO should implement Guidance for Conducting Risk Assessments and Related Risk...

193

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents - ORR Risk Assessment Documents - ORR Bullet Baseline Risk Assessments Bullet Remedial Investigation/Feasibility Study Environmental Assessment Report South Campus Facility, Oak Ridge Tenn [DOE/OR/02-1274&D] Bullet Baseline Risk Assessment for Lower East Fork Poplar Creek [DOE/OR/1119 & D2 & V2] Bullet Remedial Investigation/ Feasibility Study Report for Lower Watts Bar Reservoir Operable Unit [DOE/OR/01 1282 & D1] [ORNL/ER-2] Bullet The Utility of Existing Data Conducting a CERCLA Baseline Risk Assessment for Lower Watts Bar Reservoir (draft) [ORNL/ER-?] Bullet East Fork Poplar Creek Sewer Line Beltway Remedial Investigation Report [DOE/OR/02-1119&D2] Bullet Screening Risk Assessments Bullet Preliminary Assessment of Radiation Doses to the Public from Cesium

194

Performance Assessment Scoping - Hanford Example  

Performance Assessment Scoping - Hanford Example Linda Suttora Office of Environmental Compliance DOE-HQ Waste Processing Technical Exchange 2010

195

Integrated Assessment Modeling  

Science Conference Proceedings (OSTI)

This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

2012-10-31T23:59:59.000Z

196

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network (OSTI)

WESTERN WATER ASSESSMENT WHITE PAPER Socioeconomic Impacts and Adaptation Strategies: Assessing://www.socioeconimpacts.org and is described in greater detail in a companion white paper, "Socioeconomic Impacts and Adaptation Strategies: Assessing Research on Drought, Climate Change and Recreation". This white paper discusses literature

Neff, Jason

197

Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment  

Science Conference Proceedings (OSTI)

This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

2009-06-01T23:59:59.000Z

198

TEPP Planning Products Model Needs Assessment Self Assessment Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Products Planning Products Model Needs Assessment Self Assessment Document Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-13.p65 1 Model Needs Assessment R E V 8 - 0 7 / 2 0 1 2 T r a n s p o r t a t i o n E m e r g e n c y P r e p a r e d n e s s P r o g r a m PURPOSE The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident involving radioactive material. 1.0 INTRODUCTION This Model Needs Assessment was developed by the Department of Energy's Transportation Emergency Preparedness Program (TEPP) as a planning and assessment tool for state, tribal, or local government officials. To implement this Model Needs Assessment, a designated official

199

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

200

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

202

Microsoft Project: Essentials for Beginners This course aims to help you manage projects, both small and large, by introducing  

E-Print Network (OSTI)

materials Costs Constraints and deadlines Project monitoring Printing Course Format: This is a oneMicrosoft Project: Essentials for Beginners Overview: This course aims to help you manage projects, both small and large, by introducing you to Microsoft Project 2007. The course covers the important

Frean, Marcus

203

CompTIA A+ Complete Study Guide: Exams 220-701 (Essentials) and 220-702 (Practical Application)  

Science Conference Proceedings (OSTI)

The Essential Study Tool for the 2009 Edition of the CompTIA A+ Exams The CompTIA A+ certification is the industry standard in terms of measuring a technician's hardware and software knowledge. As the most popular entry-level certification, it is particularly ...

Quentin Docter; Emmett Dulaney; Toby Skandier

2009-10-01T23:59:59.000Z

204

Comprehensive Stability Analysis using Synchrophasors: Stability Assessment and Control from Synchrophasor Data  

Science Conference Proceedings (OSTI)

Power system stability is the ability of an electric power system to regain a state of operating equilibrium after being subjected to a physical disturbance. To maintain power system reliability, it is essential that operators ensure satisfactory rotor angle and voltage stability performance under anticipated operating scenarios and contingency conditions.Stability assessment has been dominated by simulation-based approach, in which off-line simulations are conducted to evaluate rotor ...

2013-12-09T23:59:59.000Z

205

Conversion of essential fatty acids by Delta 6 desaturase in dog liver microsomes  

E-Print Network (OSTI)

Long Chain Polyunsaturated Fatty Acids (LCPUFA) are physiologically important precursors for eicosanoids, leukotrienes, and prostanoids. Desaturation of essential fatty acids (EFAs) by []6-desaturase is considered the rate-limiting step in conversion of EFAs to LCPUFA. This study was designed to study the conversion of EFAs by []6-desaturase in dog liver microsomes. Microsomes were prepared using fresh liver from healthy dogs. Microsomes were incubated with ¹?C labeled 18 carbon EFA substrates. Following incubation, lipids were extracted, saponified and phenacylated. The resulting fatty acid phenacyl esters (FAPES) were separated by HPLC. Radioactivity was measured with a liquid scintillation counter, converted to enzymatic activity, and expressed as pmol/min/mg protein. Using 18:3n-3 as substrate, the apparent []6-desaturase maximal velocity was 50.9 pmol/min/mg protein and using 18:2n-6 substrate, the maximal velocity was 5.4 pmol/min/mg protein. Apparent K[] values were 20.8 []M for 18:3n-3 and 41.8 []M for 18:2n-6. Maximal velocities were lower than previously reported in dogs and other species. Possible explanations include the presence of high endogenous fatty acid concentration (especially 18:2n-6) inherent in the dog liver microsome preparations providing high amounts of competitive non-radioactively labeled substrate, or methodological differences used in other studies. After accounting for endogenous 18:2n-6 fatty acids, the corrected V[] and K[] for the ?-LA substrate was 62.4 pmol/min/mg protein and 12.4 []M, respectively. Corrected values of V[] and K[] for LA substrate were not calculated due to interference from high endogenous LA ubstrate concentrations in the liver microsomes. Dog liver microsomes have the ability to desaturate EFAs. Also, the maximal velocity of []6-desaturase of 18:3n-3 is considerably higher than that of 18:2n-6 in vitro, while K[] values are similar. Physiologically, 18:3n-3 concentration in liver (2.4 []M) may never exceed the K[] for desaturation in the absence of high dietary amounts while 18:2n-6 amounts are readily converted because its concentration (64.4 []M) easily exceeds the K[]. These phenomena may explain the low in vivo conversion rate of 18:3n-3 in dogs and other species. These findings suggest that high levels of 18:3n-3 supplementation may be necessary to exceed the []6-desaturase K[] and significantly affect physiological levels of n-3 LCPUFA in the dog.

Dunbar, Brent Lee

2001-01-01T23:59:59.000Z

206

NATURAL RESOURCES ASSESSMENT  

DOE Green Energy (OSTI)

The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

D.F. Fenster

2000-12-11T23:59:59.000Z

207

Status of Art & Practice of Performance Assessment within the DOE Complex  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- - Status of Art and Practice Roger R. Seitz Advisory Scientist 05 March 2009 Phoenix, Arizona USA High-Level Waste Corporate Board SRNL-MS-2009-00036 2 High-Level Waste Corporate Board - March 5, 2009 Background Performance (Safety) Assessment Process has a long history of successful use around the world Relatively good agreement about fundamental process, technical approaches continually evolving Essential blend of regulatory and science and engineering Managing uncertainties associated with complex systems over long time frames is primary challenge Emphasize iterative process rather than calculations 1. Assessment context 2. Describe system 3. Develop and justify scenarios 4. Formulate and implement models 5. Run analyses 7. Compare

208

DOEYEA-0856 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEYEA-0856 DOEYEA-0856 Environmental Assessment for Construction and Operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory Berkeley, California December 1994 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

209

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

LCSAD-001, Ver. 2 LCSAD-001, Ver. 2 Linac Commissioning Safety Assessment Document for the National Synchrotron Light Source II Photon Sciences Directorate Version 2 May 11, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II ii LT-C-ESH-LCSAD-001 ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

210

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

211

Superfund Exposure Assessment Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

1-881001 1-881001 OSWER Directive 9285.5-1 April 1988 Superfund Exposure Assessment Manual U.S. Environmental Protection Agency Office of Remedial Response Washington, DC 20460 Notice This report was prepared under contract to an agency of the United States Government. Neither the United States Government nor any of its employees, contractors, subcontractors, or their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party' s use of or the results of such use of any information, apparatus, product, or process disclosed in this report, or represents that its use by such third party would not infringe on privately owned rights. ii Table of Contents Chapter Page List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

212

Minority energy assessment report  

SciTech Connect

The purpose of this research is to project household energy consumption, energy expenditure, and energy expenditure as share of income for five population groups from 1991 to 2009. The approach uses the Minority Energy Assessment Model (MEAM), developed by Argonne National Laboratory for the US Department of Energy's Office of Minority Economic Impact. The MEAM provides a framework that can be used to forecast regional energy consumption and energy expenditure for majority, black, Hispanic, poor, and nonpoor households. The forecasts of key macroeconomic and energy variables used as exogenous variables in the MEAM were obtained from the Data Resources, Inc., Macromodel and Energy Model. Generally, the projections of household energy consumption, expenditure, and energy expenditure as share of income vary across population groups and census regions.

Teotia, A.P.S.; Poyer, D.A.; Lampley, L.; Anderson, J.L.

1992-12-01T23:59:59.000Z

213

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

214

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

BCSAD-001 BCSAD-001 Photon Sciences Directorate Booster Commissioning Safety Assessment Document For the National Synchrotron Light Source II Version 2 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

215

DOEIEA-1086 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86 86 Environmental Assessment for Amendments to 10 CFR Part 835 DISCLAIMER Portions of this document may be illegible i n electronic image products. Images are produced f h m the best avaiIable original document. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employes, makes any warranty, express or implied, or a s s u m e s any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spc- cific commercial product, process, or senrice by trade name, trademark, manufac-

216

INEEL Source Water Assessment  

SciTech Connect

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL’s drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey’s Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency’s Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL’s Source Water Assessment. Of the INEEL’s 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL’s public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, Gerald

2003-03-01T23:59:59.000Z

217

Cassini data assessment report  

DOE Green Energy (OSTI)

On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

NONE

1998-08-01T23:59:59.000Z

218

Perceptual quality assessment for compressed video  

E-Print Network (OSTI)

Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

Yang, Kai-Chieh

2007-01-01T23:59:59.000Z

219

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Needs Assessment Hanford Needs Assessment July 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing...

220

Pantex Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment Pantex Needs Assessment December 2003 This Needs Assessment for former Pantex workers was developed for the purpose of collecting existing information relevant to...

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Assessment of Initial Test Conditions for Experiments to Assess Irradiation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Initial Test Conditions for Experiments to Assess Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Irradiation-assisted stress corrosion cracking is a key materials degradation issue in today's nuclear power reactor fleet and affects critical structural components within the reactor core. The effects of increased exposure to irradiation, stress, and/or coolant can substantially increase susceptibility to stress-corrosion cracking of austenitic steels in high-temperature water environments. Despite 30 years of experience, the underlying mechanisms of Irradiation Assisted Stress Corrosion Cracking (IASCC) are unknown. Extended service conditions will increase the exposure

222

Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider  

E-Print Network (OSTI)

High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

Lebrun, Philippe

2010-01-01T23:59:59.000Z

223

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

edStateDatabasesReportEFH Search Showing 4961 - 4970 of 9,042 results. Page International Electricity Trade - Open Access DOE has consistently expressed its policy that...

224

Welding Cutting and Brazing Assessment Plan Assessment plan ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been...

225

Truck Essential Power Systems Efficiency Improvements for Medium-Duty Trucks  

DOE Green Energy (OSTI)

With a variety of hybrid vehicles available in the passenger car market, electric technologies and components of that scale are becoming readily available. Commercial vehicle segments have lagged behind passenger car markets, leaving opportunities for component and system development. Escalating fuel prices impact all markets and provide motivation for OEMs, suppliers, customers, and end-users to seek new techniques and technologies to deliver reduced fuel consumption. The research presented here specifically targets the medium-duty (MD), Class 4-7, truck market with technologies aimed at reducing fuel consumption. These technologies could facilitate not only idle, but also parasitic load reductions. The development efforts here build upon the success of the More Electric Truck (MET) demonstration program at Caterpillar Inc. Employing a variety of electric accessories, the MET demonstrated the improvement seen with such technologies on a Class 8 truck. The Truck Essential Power Systems Efficiency Improvements for Medium-Duty Trucks (TEPS) team scaled the concepts and successes of MET to a MD chassis. The team designed an integrated starter/generator (ISG) package and energy storage system (ESS), explored ways to replace belt and gear-driven accessory systems, and developed supervisory control algorithms to direct the usage of the generated electricity and system behavior on the vehicle. All of these systems needed to fit within the footprint of a MD vehicle and be compatible with the existing conventional systems to the largest extent possible. The overall goal of this effort was to demonstrate a reduction in fuel consumption across the drive cycle, including during idle periods, through truck electrification. Furthermore, the team sought to evaluate the benefits of charging the energy storage system during vehicle braking. The vehicle features an array of electric accessories facilitating on-demand, variable actuation. Removal of these accessories from the belt or geartrain of the engine yields efficiency improvements for the engine while freeing those accessories to perform at their individual peak efficiencies to meet instantaneous demand. The net result is a systems approach to fuel usage optimization. Unique control algorithms were specifically developed to capitalize on the flexibility afforded by the TEPS architecture. Moreover, the TEPS truck technology mixture exhibits a means to supplant current accessory power sources such as on-board or trailer-mounted gasoline-powered generators or air compressors. Such functionality further enhances the value of the electric systems beyond the fuel savings alone. To demonstrate the fuel economy improvement wrought via the TEPS components, vehicle fuel economy testing was performed on the nearly stock (baseline) truck and the TEPS truck. Table 1 illustrates the fuel economy gains produced by the TEPS truck electrification. While the fuel economy results shown in Table 1 do reflect specific test conditions, they show that electrification of accessory hardware can yield significant fuel savings. In this case, the savings equated to a 15 percent reduction in fuel consumption during controlled on-road testing. Truck electrification allows engine shutdown during idle conditions as well as independent on-demand actuation of accessory systems. In some cases, independent actuation may even include lack of operation, a feature not always present in mechanically driven components. This combination of attributes allows significant improvements in system efficiency and the fuel economy improvements demonstrated by the TEPS team.

Larry Slone; Jeffery Birkel

2007-12-31T23:59:59.000Z

226

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

Assess Oportunities Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

227

UAIEE and Industrial Assessment Centers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UAIEE and IACs UAIEE and IACs Michael B Muller IAC Field Manager Rutgers University 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * Started in 1976 * Currently 26 Centers across the US * Almost 15,000 Assessments * Assessments in all 50 States * Over 111,000 Recommendations * Continues to Grow yearly by: * 400 assessments * 3,000 recommendations 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 IAC Assessments of Small and Medium Manufacturers 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * ABET Accredited Engineering Universities * Director must be a teaching faculty member

228

Predicting essential components of signal transduction networks: a dynamic model of guard cell abscisic acid signaling  

E-Print Network (OSTI)

Plants both lose water and take in carbon dioxide through microscopic stomatal pores, each of which is regulated by a surrounding pair of guard cells. During drought, the plant hormone abscisic acid (ABA) inhibits stomatal opening and promotes stomatal closure, thereby promoting water conservation. Here we synthesize experimental results into a consistent guard cell signal transduction network for ABA-induced stomatal closure, and develop a dynamic model of this process. Our model captures the regulation of more than forty identified network components, and accords well with previous experimental results at both the pathway and whole cell physiological level. Our analysis reveals the novel predictions that the disruption of membrane depolarizability, anion efflux, actin cytoskeleton reorganization, cytosolic pH increase, the phosphatidic acid pathway or of K+ efflux through slowly activating K+ channels at the plasma membrane lead to the strongest reduction in ABA responsiveness. Initial experimental analysis assessing ABA-induced stomatal closure in the presence of cytosolic pH clamp imposed by the weak acid butyrate is consistent with model prediction. Our method can be readily applied to other biological signaling networks to identify key regulatory components in systems where quantitative information is limited.

Song Li; Sarah M. Assmann; Reka Albert

2006-10-05T23:59:59.000Z

229

Tumor Necrosis Factor Receptor p55 Is Essential for Intrahepatic Granuloma Formation and Hepatocellular Apoptosis in a Murine Model of Bacterium-Induced Fulminant Hepatitis  

E-Print Network (OSTI)

Tumor necrosis factor receptor p55 is essential for intrahepatic granuloma formation and hepatocellular apoptosis in a murine model of bacterium-induced fulminant hepatitis.

H Tsuji; A Harada; N Mukaida; Y Nakanuma; H Bluethmann; K Yamakawa; S I Nakamura; K I Kobayashi; Hirokazu Tsuji; Akihisa Harada; Naofumi Mukaida; Yasuni Nakanuma; Horst Bluethmann; Shuichi Kaneko; Kiyotaka Yamakawa; Shin-ichi Nakamura

1996-01-01T23:59:59.000Z

230

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

A Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes January 2013 #12;Assessment Handbook 2 Table of Contents Table of Contents............................................................................................1 Assessment Handbook

Hemmers, Oliver

231

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes July 2012 #12;Assessment Handbook University of Nevada, Las Vegas 1 Table of Contents Assessment Handbook

Hemmers, Oliver

232

Advanced Distribution Automation Technical Assessments  

Science Conference Proceedings (OSTI)

This 2008 progress report on advanced distribution technical assessments focused on the International Electrotechnical Commission (IEC) TC-57 body of standards.

2008-12-19T23:59:59.000Z

233

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

234

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Conducting Risk Assessments and Related Risk Activities for the DOE-ORO Environmental Management Program. BJCOR-271 Guidance for Treatment of Variability and...

235

Conformity Assessment Workshop April 2012  

Science Conference Proceedings (OSTI)

... 2_4 USDA Agricultural Marketing Service - The Breadth of Conformity Assessment Activities in the Federal Arena: Dana K. Stahl, USDA - AMS. ...

2013-06-12T23:59:59.000Z

236

Internal Dose Assessment (IDA) Spreadsheet  

Science Conference Proceedings (OSTI)

The purpose of the Internal Dose Assessment (IDA) Spreadsheet is to calculate internal occupational dose following the methodology described in the EPRI Alpha Monitoring Guidelines.

2007-04-12T23:59:59.000Z

237

PRIVACY IMPACT ASSESSMENT: INL Communications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessments, for reqUirements and additional guidance for conducting a PIA: http:www.directives.doe.govpdfsdoedoetextlneword206o2061.pdf Please complete electronically:...

238

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

011B. Office of Research and Development, Washington, D.C. 1992. Exposure Factors Handbook. EPA6008- 89043. Office of Health and Environmental Assessment, Washington, D.C....

239

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. EPA, Washington, D.C. 1992. Risk Assessment Forum. Wildlife Exposure Factors Handbook. Vol. I. United Staes Environmental Protection Agency. Office of Research and...

240

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Hydrogen energy assessment  

SciTech Connect

The purpose of this assessment is to define the near term and long term prospects for the use of hydrogen as an energy delivery medium. Possible applications of hydrogen are defined along with the associated technologies required for implementation. A major focus in the near term is on industrial uses of hydrogen for special applications. The major source of hydrogen in the near term is expected to be from coal, with hydrogen from electric sources supplying a smaller fraction. A number of potential applications for hydrogen in the long term are identified and the level of demand estimated. The results of a cost benefit study for R and D work on coal gasification to hydrogen and electrolytic production of hydrogen are presented in order to aid in defining approximate levels of R and D funding. A considerable amount of data is presented on the cost of producing hydrogen from various energy resources. A key conclusion of the study is that in time hydrogen is likely to play a role in the energy system; however, hydrogen is not yet competitive for most applications when compared to the cost of energy from petroleum and natural gas.

Salzano, F J; Braun, C [eds.

1977-09-01T23:59:59.000Z

242

Geothermal Energy Resource Assessment  

DOE Green Energy (OSTI)

This report covers the objectives and the status of a long-range program to develop techniques for assessing the resource potential of liquid-dominated geothermal systems. Field studies underway in northern Nevada comprise a systematic integrated program of geologic, geophysical, and geochemical measurements, necessary to specify a drilling program encompassing heat flow holes, deep calibration holes, and ultimately, deep test wells. The status of Nevada field activities is described. The areas under study are in a region characterized by high heat flow where temperatures at depth in some geothermal systems exceed 180 C. Areas presently being examined include Beowawe Hot Springs in Whirlwind Valley. Buffalo Valley Hot Springs, Leach Hot Springs in Grass Valley, and Kyle Hot Springs in Buena Vista Valley. Geologic studies encompass detailed examinations of structure and lithology to establish the geologic framework of the areas. The geothermal occurrences are characterized by zones of intense fault intersection, which furnish permeable channelways for the introduction of meteoric water into regions of high temperature at depth.

Wollenberg, H.A.; Asaro, F.; Bowman, H.; McEvilly, T.; Morrison, F.; Witherspoon, P.

1975-07-01T23:59:59.000Z

243

Fueling area site assessment  

SciTech Connect

This report provides results of a Site Assessment performed at the Fuel Storage Area at Buckley ANG Base in Aurora, Colorado. Buckley ANG Base occupies 3,328 acres of land within the City of Aurora in Arapahoe County, Colorado. The Fuel Storage Area (also known as the Fueling Area) is located on the west side of the Base at the intersection of South Powderhorn Street and East Breckenridge Avenue. The Fueling Area consists of above ground storage tanks in a bermed area, pumps, piping, valves, an unloading stand and a fill stand. Jet fuel from the Fueling Area is used to support aircraft operations at the Base. Jet fuel is stored in two 200,000 gallon above ground storage tanks. Fuel is received in tanker trucks at the unloading stand located south and east of the storage tanks. Fuel required for aircraft fueling and other use is transferred into tanker trucks at the fill stand and transported to various points on the Base. The Fuel Storage Area has been in operation for over 20 years and handles approximately 7 million gallons of jet fuel annually.

1996-08-15T23:59:59.000Z

244

EA-1835: Environmental Assessment Determination | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Determination EA-1835: Environmental Assessment Determination Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project in Chester...

245

Idaho National Laboratory - Hydropower Program - Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software State Resource Assessments Resource Assessments Reports Technology Transfer Virtual Hydropower Prospector Virtual Hydropower Prospector do Brasil...

246

RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT  

DOE Green Energy (OSTI)

Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

2012-03-31T23:59:59.000Z

247

Software products for risk assessment  

Science Conference Proceedings (OSTI)

For assessing risks in all environments it is often necessary to use a systematic approach of modeling and simulation with the aim to simplify this process in the framework of designing new technological lines, machines, equipment and processes. Also ... Keywords: crisis management, risk assessment, software products

Jozef Ristvej; Tomas Lovecek

2011-11-01T23:59:59.000Z

248

Cogeneration Assessment Methodology for Utilities  

E-Print Network (OSTI)

A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic assessment model, and a data base to track customers over time. A case study is presented describing the background, procedures, and results of a cogeneration investigation for Northeast Utilities.

Sedlik, B.

1983-01-01T23:59:59.000Z

249

Assessment of Distributed Resource Technologies  

Science Conference Proceedings (OSTI)

This report assesses the current status and prospects for future improvements of distributed resource (DR) technologies: microturbines, PEM fuel cells, solid oxide fuel cells, molten carbonate fuel cells, phosphoric acid fuel cells, reciprocating engines, combustion turbines, stirling engines, and energy storage devices. It also assesses the communications, interconnection, and control systems used by these devices.

1999-12-14T23:59:59.000Z

250

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents ORNL RA Graphic Results ORNL Baseline Risk Assessment Results ORNL Screening Risk Assessment Results ORNL Other Risk Assessment Results ORNL RA Graphic Results WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse (No Fish) Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Industrial Landuse

251

Performance Assessment Community of Practice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L L l W t C t B d High-Level Waste Corporate Board Performance Assessment Community of Practice Community of Practice John E. Marra, Ph.D. Associate Laboratory Director Associate Laboratory Director 5 March 2009 DOE EM HLW Corporate Board Meeting Phoenix, Arizona DOE-EM HLW Corporate Board Meeting Performance Assessment Process Community of Practice Background EM Senior Management would like to have g improved consistency in the execution of the Performance Assessment* process; Originally formed a sub-committee to draft a guidance document for practitioners; Th b itt b li C it f The sub-committee now believes a Community of Practice having broader scope should replace it; Draft Charter in review and presented for Draft Charter in review and presented for discussion. * Performance Assessment (PA) is used broadly to encompass assessments for LLW

252

Advanced Manufacturing Office: Industrial Assessment Centers (IACs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Assessment Industrial Assessment Centers (IACs) to someone by E-mail Share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Facebook Tweet about Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Twitter Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Google Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Delicious Rank Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Digg Find More places to share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on AddThis.com... Industrial Assessment Centers (IACs) Learn More Learn how companies have benefited from IAC assessments. Search the IAC Database for recommendations and savings achieved.

253

TMCC WIND RESOURCE ASSESSMENT  

DOE Green Energy (OSTI)

North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

Turtle Mountain Community College

2003-12-30T23:59:59.000Z

254

Assessment of coal liquids as refinery feedstocks  

Science Conference Proceedings (OSTI)

The R D of direct coal liquefaction has reached such a stage that current two-stage processes can produce coal liquids with high yields and improved quality at a reasonable cost. To fully realize the potential value, these coal liquids should be refined into high-value liquid transportation fuels. The purpose of this study is to assess coal liquids as feedstocks to be processed by modern petroleum refining technologies. After the introduction, Section 2.0 summarizes ASTM specifications for major transportation fuels: gasoline, jet fuel, and diesel fuel, which serve as a target for coal-liquid refining. A concise description of modern refining processes follows with an emphasis on the requirements for the raw materials. These provide criteria to judge the quality of coal liquids as a refinery feedstock for the production of marketable liquid fuels. Section 3.0 surveys the properties of coal liquids produced by various liquefaction processes. Compared with typical petroleum oils, the current two-stage coal liquids are: Light in boiling range and free of resids and metals; very low in sulfur but relatively high in oxygen; relatively low in hydrogen and high in cyclics content; and essentially toxicologically inactive when end point is lower than 650[degrees]F, particularly after hydroprocessing. Despite these characteristics, the coal liquids are basically similar to petroleum. The modern refining technology is capable of processing coal liquids into transportation fuels meeting all specifications, and hydroprocessinq is obviously the major tool. The important point is the determination of a reasonable product slate and an appropriate refining scheme.

Zhou, P.

1992-02-01T23:59:59.000Z

255

Assessment of coal liquids as refinery feedstocks  

Science Conference Proceedings (OSTI)

The R&D of direct coal liquefaction has reached such a stage that current two-stage processes can produce coal liquids with high yields and improved quality at a reasonable cost. To fully realize the potential value, these coal liquids should be refined into high-value liquid transportation fuels. The purpose of this study is to assess coal liquids as feedstocks to be processed by modern petroleum refining technologies. After the introduction, Section 2.0 summarizes ASTM specifications for major transportation fuels: gasoline, jet fuel, and diesel fuel, which serve as a target for coal-liquid refining. A concise description of modern refining processes follows with an emphasis on the requirements for the raw materials. These provide criteria to judge the quality of coal liquids as a refinery feedstock for the production of marketable liquid fuels. Section 3.0 surveys the properties of coal liquids produced by various liquefaction processes. Compared with typical petroleum oils, the current two-stage coal liquids are: Light in boiling range and free of resids and metals; very low in sulfur but relatively high in oxygen; relatively low in hydrogen and high in cyclics content; and essentially toxicologically inactive when end point is lower than 650{degrees}F, particularly after hydroprocessing. Despite these characteristics, the coal liquids are basically similar to petroleum. The modern refining technology is capable of processing coal liquids into transportation fuels meeting all specifications, and hydroprocessinq is obviously the major tool. The important point is the determination of a reasonable product slate and an appropriate refining scheme.

Zhou, P.

1992-02-01T23:59:59.000Z

256

An Assessment of Integrated Health Management Frameworks  

Science Conference Proceedings (OSTI)

In order to meet the ever increasing demand for energy, the United States nuclear industry is turning to life extension of existing nuclear power plants (NPPs). Economically ensuring the safe, secure, and reliable operation of aging NPPs presents many challenges. The 2009 Light Water Reactor Sustainability Workshop identified online monitoring of active and structural components as essential to better understanding and management of the challenges posed by aging NPPs. Additionally, there is increasing adoption of condition-based maintenance (CBM) for active components in NPPs. These techniques provide a foundation upon which a variety of advanced online surveillance, diagnostic, and prognostic techniques can be deployed to continuously monitor and assess the health of NPP systems and components. The next step in the development of advanced online monitoring is to move beyond CBM to estimating the remaining useful life of active components using prognostic tools. Deployment of prognostic health management (PHM) on the scale of an NPP requires the use of an integrated health management (IHM) framework - a software product (or suite of products) used to manage the necessary elements needed for a complete implementation of online monitoring and prognostics. This paper provides a thoughtful look at the desirable functions and features of IHM architectures. A full PHM system involves several modules, including data acquisition, system modeling, fault detection, fault diagnostics, system prognostics, and advisory generation (operations and maintenance planning). The standards applicable to PHM applications are indentified and summarized. A list of evaluation criteria for PHM software products, developed to ensure scalability of the toolset to an environment with the complexity of an NPP, is presented. Fourteen commercially available PHM software products are identified and classified into four groups: research tools, PHM system development tools, deployable architectures, and peripheral tools.

Lybeck, Nancy; Coble, Jamie B.; Tawfik, Magdy; Bond, Leonard J.

2012-05-18T23:59:59.000Z

257

Resource assessment methodologies and applications  

Science Conference Proceedings (OSTI)

Resource assessment refers to the estimation and evaluation of mineral materials in the ground, both discovered and undiscovered. In such as an assessment, attention is centered on materials in such form, concentration, and location that they might be extractable under foreseeable economic and technological conditions. In practical terms, there is no such thing as an all-purpose resource assessment. Diverse groups of people interested in such assessments, be they mineral exploration planners, economic analysts, land use planners, or policymakers, will look for aspects that are most pertinent to their own field and time frame of interest. For example, exploration analysts would be most interested in the geological potential for discovering certain types of deposits in a region; mining engineers in the physical and chemical characteristics of deposits already discovered; and economists in the possible mineral-supply stream that might be generated in the future. No single assessment can throw light on all aspects of conceivable interest, and every type of assessment will have its conceptual and analytical limitations. Six major resource assessment methodologies are presented: areal value, crustal abundance, volumetric, deposit modeling, Delphi, and intergrated synthesis. Each methodology has certain strengths and weaknesses and type of resource estimate, factos which must be considered before application of any one technique. Each of these methods is discussed.

Dorian, J.P.; Zwartendyk, J.

1984-01-01T23:59:59.000Z

258

Criteria for assessing the quality of nuclear probabilistic risk assessments  

E-Print Network (OSTI)

The final outcome of a nuclear Probabilistic Risk Assessment (PRA) is generally inaccurate and imprecise. This is primarily because not all risk contributors are addressed in the analysis, and there are state-of-knowledge ...

Zhu, Yingli, 1976-

2004-01-01T23:59:59.000Z

259

Viability Assessment Volume 4  

SciTech Connect

Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

DOE

1998-12-01T23:59:59.000Z

260

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

262

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network (OSTI)

Improved system efficiency can contribute to an industrial facility’s bottom line and also improve reliability and better utilize assets. Despite these opportunities, many industrial facilities continue to have unrealized system optimization potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems for consumers in determining the relative quality of assessment service offerings. Achieving certification for energy efficiency will require industrial facilities to document a specified reduction in energy intensity. Application of System Assessment Standards will offer industrial facilities seeking certification a well-defined path toward improved energy intensity. System Assessment Standards will help define the market for both users and providers of industrial system assessment services. Use of these standards will provide assurance that a particular assessment represents a recognized threshold for accuracy and completeness. The goal is a significant increase in system energy efficiency improvements in U.S. industry.

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

263

SunShot Initiative: Solar Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Resource Assessment to Solar Resource Assessment to someone by E-mail Share SunShot Initiative: Solar Resource Assessment on Facebook Tweet about SunShot Initiative: Solar Resource Assessment on Twitter Bookmark SunShot Initiative: Solar Resource Assessment on Google Bookmark SunShot Initiative: Solar Resource Assessment on Delicious Rank SunShot Initiative: Solar Resource Assessment on Digg Find More places to share SunShot Initiative: Solar Resource Assessment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards Balance of Systems

264

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Print E-mail Overview Print E-mail Below you will find answers to the most frequently asked questions about the First National Climate Assessment Report. alt Goal and Architecture Organization and Mandate Regions Sectors Synthesis Report Scenarios Relationship to Other Activities Goal and Architecture What was the goal of the First National Assessment? The overall goal of the National Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the public, the environment, and the nation's resources. Special efforts were made to involve the end users - such as water resource managers, farmers, and decisionmakers - in all stages of the Assessment so that the final outcome was useful to the widest audience possible and was truly developed through a participatory process.

265

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents Y-12 RA Graphic Results Y-12 Baseline Risk Assessment Results Y-12 Screening Risk Assessment Results Bullet Graphic Risk Results Arrow Bear Creek Valley Maps Residential Landuse Groundwater - Total Hazard (range: 1 - 900) Groundwater - Total Hazard (range: 0.1 - 1) Groundwater - Total Risk (range: 10-4 - 1) Groundwater - Total Risk (range: 10-5 - 10-4) Groundwater - Total Risk (range: 10-6 - 10-5) Groundwater - Dichloroethane, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Risk Groundwater - Dichloroethane, 1,2- Risk Groundwater - Dichloroethene, 1,2- Hazard Groundwater - Nitrate Hazard Groundwater - Radium Risk Groundwater - Technetium-99 Risk Groundwater - Tetrachloroethene Hazard Groundwater - Tetrachloroethene Risk

266

NREL: Energy Analysis: Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Assessment Resource Assessment NREL has developed maps and tools to conduct renewable energy resource assessments at the state, national and international level. Around the world, interest is growing in renewable energy as a strategy to mitigate greenhouse gas emissions and increase energy security. The starting point for new renewable energy projects is a characterization of the renewable resources available across a region, a resource assessment. NREL uses geospatial data sets to identify regions that are appropriate for renewable development and those that should be excluded such as water bodies, urban areas, cropland, forests, very steep terrain, and protected areas. Once resource data are available for a region, NREL can estimate the theoretical potential, or upper limit, for renewable energy in an area.

267

Second National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt An affiliated website was created specifically for the 2009 National Climate Assessment so that the report would be more accessible to a variety of interested...

268

Fort Carson Wind Resource Assessment  

DOE Green Energy (OSTI)

This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

Robichaud, R.

2012-10-01T23:59:59.000Z

269

Probabilistic Risk Assessment - A Bibliography  

Science Conference Proceedings (OSTI)

Probabilistic risk analysis is an integration of failure modes and effects analysis (FEMA), fault tree analysis and other techniques to assess the potential for failure and to find ways to reduce risk. This bibliography references 160 documents in the ...

Program NASA Scientific and Technical Information

2000-07-01T23:59:59.000Z

270

Fiscal Year 2012 Revegetation Assessment  

Science Conference Proceedings (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

271

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the...

272

Environmental Design Space model assessment  

E-Print Network (OSTI)

The Environmental Design Space (EDS) is a multi-disciplinary design tool used to explore trade-offs among aircraft fuel burn, emissions, and noise. This thesis uses multiple metrics to assess an EDS model of a Boeing 777 ...

Spindler, Phillip Michael

2007-01-01T23:59:59.000Z

273

Assessing Cloud-Phase Conditions  

Science Conference Proceedings (OSTI)

In situ microphysics measurements made during the First and Third Canadian Freezing Drizzle Experiments (CFDE I and III, respectively) have been used to assess the relative responses to ice and liquid hydrometeors for several common instruments. ...

Stewart G. Cober; George A. Isaac; Alexei V. Korolev; J. Walter Strapp

2001-11-01T23:59:59.000Z

274

Guam Initial Technical Assessment Report  

SciTech Connect

Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

2011-04-01T23:59:59.000Z

275

Steam Generator Integrity Assessment Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance for evaluating the condition of steam generator (SG) tubes based on nondestructive examination (NDE) or in situ pressure testing. This integrity assessment is normally performed during a reactor refueling outage. Nuclear power plant licensees who follow this document's guidelines will have satisfied their requirements for condition monitoring and operational assessment as defined in the Nuclear Energy Institute (NEI) initiative, Steam Generator Program Guidelines, NEI 97-06.

2006-07-25T23:59:59.000Z

276

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

277

EA-1853: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT DOE/EA-1853 PERRIN RANCH WIND ENERGY INTERCONNECTION PROJECT COCONINO COUNTY, ARIZONA Prepared for U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457 Phoenix, Arizona 85005 Prepared by SWCA Environmental Consultants 3033 North Central Avenue, Suite 145 Phoenix, Arizona 85012 (602) 274-3831 www.swca.com July 2011 July 2011 i CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 1 1. INTRODUCTION ................................................................................................................................ 1 1.1 BACKGROUND .......................................................................................................................... 1

278

A Novel Fold in the Tral Relaxase-Helicase C-Terminal Domain Is Essential for Conjugative DNA Transfer  

Science Conference Proceedings (OSTI)

TraI relaxase-helicase is the central catalytic component of the multiprotein relaxosome complex responsible for conjugative DNA transfer (CDT) between bacterial cells. CDT is a primary mechanism for the lateral propagation of microbial genetic material, including the spread of antibiotic resistance genes. The 2.4-{angstrom} resolution crystal structure of the C-terminal domain of the multifunctional Escherichia coli F (fertility) plasmid TraI protein is presented, and specific structural regions essential for CDT are identified. The crystal structure reveals a novel fold composed of a 28-residue N-terminal {alpha}-domain connected by a proline-rich loop to a compact {alpha}/{beta}-domain. Both the globular nature of the {alpha}/{beta}-domain and the presence as well as rigidity of the proline-rich loop are required for DNA transfer and single-stranded DNA binding. Taken together, these data establish the specific structural features of this noncatalytic domain that are essential to DNA conjugation.

Guogas, Laura M.; Kennedy, Sarah A.; Lee, Jin-Hyup; Redinbo, Matthew R.; (UNC)

2009-06-04T23:59:59.000Z

279

Characterization of STIP, a multi-domain nuclear protein, highly conserved in metazoans, and essential for embryogenesis in Caenorhabditis elegans  

Science Conference Proceedings (OSTI)

We report here the identification and characterization of STIP, a multi-domain nuclear protein that contains a G-patch, a coiled-coil, and several short tryptophan-tryptophan repeats highly conserved in metazoan species. To analyze their functional role in vivo, we cloned nematode stip-1 genes and determined the spatiotemporal pattern of Caenorhabditis elegans STIP-1 protein. RNA analyses and Western blots revealed that stip-1 mRNA was produced via trans-splicing and translated as a 95-kDa protein. Using reporter constructs, we found STIP-1 to be expressed at all developmental stages and in many tissue/cell types including worm oocyte nuclei. We found that STIP-1 is targeted to the nucleus and forms large polymers with a rod-like shape when expressed in mammalian cells. Using deletion mutants, we mapped the regions of STIP-1 involved in nuclear import and polymer assembly. We further showed that knockdown of C. elegans stip-1 by RNA interference arrested development and resulted in morphologic abnormalities around the 16-cell stage followed by 100% lethality, suggesting its essential role in worm embryogenesis. Importantly, the embryonic lethal phenotype could be faithfully rescued with Drosophila and human genes via transgenic expression. Our data provide the first direct evidence that STIP have a conserved essential nuclear function across metazoans from worms to humans.

Ji Qiongmei [Laboratory of Biochemistry and Molecular Genetics, Lindsley F. Kimball Research Institute, New York Blood Center, 310 E 67th Street, New York, NY 10021 (United States); Huang, C.-H. [Laboratory of Biochemistry and Molecular Genetics, Lindsley F. Kimball Research Institute, New York Blood Center, 310 E 67th Street, New York, NY 10021 (United States)]. E-mail: chuang@nybloodcenter.org; Peng Jianbin [Laboratory of Biochemistry and Molecular Genetics, Lindsley F. Kimball Research Institute, New York Blood Center, 310 E 67th Street, New York, NY 10021 (United States); Hashmi, Sarwar [Developmental Biology, Lindsley F. Kimball Research Institute, New York Blood Center, New York, NY 10021 (United States); Ye Tianzhang [Laboratory of Biochemistry and Molecular Genetics, Lindsley F. Kimball Research Institute, New York Blood Center, 310 E 67th Street, New York, NY 10021 (United States); Chen Ying [Laboratory of Biochemistry and Molecular Genetics, Lindsley F. Kimball Research Institute, New York Blood Center, 310 E 67th Street, New York, NY 10021 (United States)

2007-04-15T23:59:59.000Z

280

Assessment of geothermal development in the Imperial Valley of California. Volume 2. Environmental control technology  

DOE Green Energy (OSTI)

Environmental control technologies are essential elements to be included in the overall design of Imperial Valley geothermal power systems. Environmental controls applicable to abatement of hydrogen sulfide emissions, cooling tower drift, noise, liquid and solid wastes, and induced subsidence and seismicity are assessed here. For optimum abatement of H{sub 2}S under a variety of plant operating conditions, removal of H{sub 2}S upstream of the steam turbine is recommended. The environmental impact of cooling tower drift will be closely tied to the quality of cooling water supplies. Conventional noise abatement procedures can be applied and no special research and development are needed. Injection technology constitutes the primary and most essential environmental control and liquid waste disposal technology for Imperial Velley geothermal operations. Subsurface injection of fluids is the primary control for managing induced subsidence. Careful maintenance of injection pressure is expected to control induced seismicity. (MHR)

Morris, W.; Hill, J. (eds.)

1980-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Ecological and Wildlife Risk Assessment of Chemicals Encountered in Vegetation Management on Electric Utility Rights-of-Way  

Science Conference Proceedings (OSTI)

The management of vegetation on electric utility rights-of-way (ROWs) is an essential part of managing electrical transmission and distribution systems. A variety of manual, mechanical, and chemical methods, singly or in combination, are used for this purpose. The method or methods selected must be safe for humans and the environment and cost-effective in accomplishing the goals of ROW management. This report reviews environmental and wildlife safety through an assessment of risk to the environment, incl...

2004-12-27T23:59:59.000Z

282

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

DOE Green Energy (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

283

Argonne National Laboratory Launches Bioenergy Assessment Tools...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools September 30, 2013 - 4:00pm Addthis A researcher...

284

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 1993 30, 1993 EA-0921: Final Environmental Assessment Ambulatory Research and Education Center, Oregon Health Sciences University July 1, 1993 EA-0847: Final Environmental Assessment Live Fire Range at the Central Training Academy, Albuquerque, New Mexico June 25, 1993 EA-0841: Final Environmental Assessment Import of Russian Plutonium-238 June 3, 1993 EA-0923: Final Environmental Assessment Winnett School District Boiler Replacement Project June 1, 1993 EA-0792: Final Environmental Assessment Nonnuclear Consolidation Environmental Assessment April 2, 1993 EA-0822: Final Environmental Assessment Idaho National Engineering Laboratory Consolidated Transportation Facility January 29, 1993 EA-0688: Final Environmental Assessment Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

285

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC) Print E-mail National Climate Assessment and Development Advisory Committee (NCADAC) pdf | html A Notice by...

286

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC); Notice of Open Meeting (6122013) Print E-mail National Climate Assessment and Development Advisory...

287

Problem Formulations for Ecological Risk Assessments Conducted...  

NLE Websites -- All DOE Office Websites (Extended Search)

- deformities, fin erosion, lesions, and tumors ERA - ecological risk assessment HHRA - human health risk assessments ow K - octanol-water partition coefficients oc K - organic...

288

Solar Schools Assessment and Implementation Project: Financing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options...

289

Supplemental Guidance for Assessing Susceptibility from Early...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment, ORD Michael P. Firestone, Office of Children's Health Protection, OA Lynn Flowers, National Center for Environmental Assessment, ORD R. Woodrow Setzer,...

290

Independent Oversight Assessment , Idaho National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment , Idaho National Laboratory Site - May 2010 Independent Oversight Assessment , Idaho National Laboratory Site - May 2010 May 2010 Environmental Monitoring at the Idaho...

291

EA-1533: Floodplain Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1533: Floodplain Assessment Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This environmental assessment (EA) provides sufficient...

292

Natural Resource Damages Assessment | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Council Report Calls for Official Natural Resource Damage Assessment for LANL NRDA PreAssessment Screen, January 2010 Factsheet: Los Alamos National Laboratory...

293

Assess the U.S. Climate  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment (NCA). The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. The Assessment: Informs the...

294

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network (OSTI)

Audit & Assessment Program Manual • C-5 Appendix C. ExamplesAudit & Assessment Program Manual Prepared by: Environment,1 Original Issue All Rename manual; allow for internal and

Thorson, Patrick

2009-01-01T23:59:59.000Z

295

Industrial Assessment Centers Help Students, Communities Learn...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency March...

296

Training Needs Assessment Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Needs Assessment Training Training Needs Assessment Training The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's...

297

EA-1859: Floodplain Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9: Floodplain Assessment EA-1859: Floodplain Assessment Kirkwood Community College Wind Energy Facility Kirkwood Community College in Cedar Rapids, Iowa is proposing the...

298

Qualitative methods for assessing risk  

SciTech Connect

The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

Mahn, J.A. [Sandia National Labs., Albuquerque, NM (United States); Hannaman, G.W. [Science Applications International Corp., San Diego, CA (United States); Kryska, P. [Science Applications International Corp., Albuquerque, NM (United States)

1995-04-01T23:59:59.000Z

299

Bringing Water into an Integrated Assessment Framework  

Science Conference Proceedings (OSTI)

We developed a modeling capability to understand how water is allocated within a river basin and examined present and future water allocations among agriculture, energy production, other human requirements, and ecological needs. Water is an essential natural resource needed for food and fiber production, household and industrial uses, energy production, transportation, tourism and recreation, and the functioning of natural ecosystems. Anthropogenic climate change and population growth are anticipated to impose unprecedented pressure on water resources during this century. Pacific Northwest National Laboratory (PNNL) researchers have pioneered the development of integrated assessment (IA) models for the analysis of energy and economic systems under conditions of climate change. This Laboratory Directed Research and Development (LDRD) effort led to the development of a modeling capability to evaluate current and future water allocations between human requirements and ecosystem services. The Water Prototype Model (WPM) was built in STELLA®, a computer modeling package with a powerful interface that enables users to construct dynamic models to simulate and integrate many processes (biological, hydrological, economics, sociological). A 150,404-km2 basin in the United States (U.S.) Pacific Northwest region served as the platform for the development of the WPM. About 60% of the study basin is in the state of Washington with the rest in Oregon. The Columbia River runs through the basin for 874 km, starting at the international border with Canada and ending (for the purpose of the simulation) at The Dalles dam. Water enters the basin through precipitation and from streamflows originating from the Columbia River at the international border with Canada, the Spokane River, and the Snake River. Water leaves the basin through evapotranspiration, consumptive uses (irrigation, livestock, domestic, commercial, mining, industrial, and off-stream power generation), and streamflow through The Dalles dam. Water also enters the Columbia River via runoff from land. The model runs on a monthly timescale to account for the impact of seasonal variations of climate, streamflows, and water uses. Data for the model prototype were obtained from national databases and ecosystem model results. The WPM can be run from three sources: 1) directly from STELLA, 2) with the isee Player®, or 3) the web version of WPM constructed with NetSim® software. When running any of these three versions, the user is presented a screen with a series of buttons, graphs, and a table. Two of the buttons provide the user with background and instructions on how to run the model. Currently, there are five types of scenarios that can be manipulated alone or in combination using the Sliding Input Devices: 1) interannual variability (e.g., El Niño), 2) climate change, 3) salmon policy, 4) future population, and 5) biodiesel production. Overall, the WPM captured the effects of streamflow conditions on hydropower production. Under La Niña conditions, more hydropower is available during all months of the year, with a substantially higher availability during spring and summer. Under El Niño conditions, hydropower would be reduced, with a total decline of 15% from normal weather conditions over the year. A policy of flow augmentation to facilitate the spring migration of smolts to the ocean would also reduce hydropower supply. Modeled hydropower generation was 23% greater than the 81 TWh reported in the 1995 U.S. Geological Survey (USGS) database. The modeling capability presented here contains the essential features to conduct basin-scale analyses of water allocation under current and future climates. Due to its underlying data structure iv and conceptual foundation, the WPM should be appropriate to conduct IA modeling at national and global scales.

Izaurralde, Roberto C.; Thomson, Allison M.; Sands, Ronald; Pitcher, Hugh M.

2010-11-30T23:59:59.000Z

300

HTGR: an assessment of safety and investment risk  

SciTech Connect

Improvements in the present LWR designs which do not change the basic features that raise safety and economic concerns would not be expected to change public perception or be sufficient to encourage new nuclear investments by the utilities. The HTGR offers an attractive alternative, an alternative with proven operating experience and safety characteristics. This is demonstrated in this paper by an assessment of HTGR inherent safety features and by examining Fort St. Vrain operating experience data, which establish the HTGR as a forgiving design with respect to potential accidents. A further quantification of HTGR safety is made from a probabilistic risk assessment (PRA) of the 2240 MWt High-Temperature Gas-Cooled Reactor-Steam Cycle/Cogeneration (HTGR-SC/C) reference plant. These results are compared to NRC risk goals and achieved LWR safety. Finally, a proposed small HTGR reactor design is discussed. Although the relative costs and marketability of such a small reactor have yet to be determined, several additional passive safety characteristics of the small HTGR make such a plant essentially benign.

Fisher, C.; Fortescue, P.; Goodjohn, A.J.; Olsen, B.E.; Silady, F.A.

1984-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Guidelines for Ecological Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

5/002F 5/002F April 1998 Guidelines for Ecological Risk Assessment (Published on May 14, 1998, Federal Register 63(93):26846-26924) Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. NOTICE This report contains the full text of the Guidelines for Ecological Risk Assessment. However, the format of this version differs from the Federal Register version, as follows: text boxes that are included in this document at their point of reference were instead listed at the end of the Federal Register document as text notes, due to format limitations for Federal Register documents.

302

Impact Assessments | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Assessments Impact Assessments Impact Assessments PIA Template with Guidance (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf) DOE Jobs Online (Hiring Management) (pdf) FORM EIA 457-A/G Residential Energy Consumption Survey (pdf) Office of Hearings and Appeals (OHA) Tracking System (pdf) Corporate Human Resources Information System (CHRIS) (pdf) Energy Inspector General Project Tracking System (EIGPT) (pdf) Electronic DOE Information Security System (eDISS) (pdf)

303

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphic Results Graphic Results Baseline Risk Assessment Results Screening Risk Assessment Results Other Risk Assessment Results Graphic Results K-25 Groundwater Residential Landuse Bedrock Wells - Total Hazard (range: 1-30) Bedrock Wells - Total Hazard (range: 0.1 - 1) Bedrock Wells - Total Risk Bedrock Wells - Arsenic Risk Bedrock Wells - Dichloroethene, 1,1- Risk Bedrock Wells - Trichloroethene Risk Unconsolidated Wells - Total Hazard (range: 1-150) Unconsolidated Wells - Total Hazard (range: 0.1 - 1) Unconsolidated Wells - Total Risk (range:10-4 - 1) Unconsolidated Wells - Total Risk (range:10-6 - 10-4) Unconsolidated Wells - Arsenic Risk Unconsolidated Wells - Trichloroethene Risk ORNL WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk

304

Ion exchange technology assessment report  

SciTech Connect

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-12-31T23:59:59.000Z

305

SRS Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

306

resource assessment | OpenEI  

Open Energy Info (EERE)

resource assessment resource assessment Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago) Date Updated Unknown Keywords Feasibility Study resource assessment Solar Energy SWERA Bangladesh Wind Energy Data application/pdf icon swera_bangladesh_fullreport.pdf (pdf, 2.7 MiB)

307

Assessing Reliability In Hydrogen Supply Pathways  

E-Print Network (OSTI)

gas and petroleum exports Other suppliers pose greater threats (Potential) importsImport terminals – Global LNG tanker fleet – Domestic natural gasgas supply LNG dependence on other systems Essentially 100% imports

McCarthy, Ryan; Ogden, Joan M

2005-01-01T23:59:59.000Z

308

Rheological properties essential for the atomization of coal water slurries (CWS). Quarterly progress report, September 15, 1992--December 15, 1992  

SciTech Connect

During the previous quarter, it was noted that understanding the rheology of polymeric additives used in enhancing the stability of the CWS was essential in meeting the project objectives. Thus, further review of the literature was carried out to gain information on the rheology of polymeric additives, particularly at high shear rates. Philippoff and Hess [1] reported the existence of four distinct flow regions in the behavior of flow curve analysis of polymer solutions (Figure 1). These regions are characterized by (1) A Newtonian Region; (2) A non-Newtonian pseudoplastic region; (3) A second Newtonian region at high shear rates 10{sup 5} to 10{sup 6} sec{sup {minus}1}; (4) and a region of steepening slope identified as the onset of turbulence. Efforts during this past quarter were therefore directed towards the study of high shear rheology of the CWS.

Ohene, F.

1992-12-31T23:59:59.000Z

309

Structure of the cytoplasmic domain of Yersinia pestis YscD, an essential component of the type III secretion system  

Science Conference Proceedings (OSTI)

The Yersinia pestis YscD protein is an essential component of the type III secretion system. YscD consists of an N-terminal cytoplasmic domain (residues 1-121), a transmembrane linker (122-142) and a large periplasmic domain (143-419). Both the cytoplasmic and the periplasmic domains are required for the assembly of the type III secretion system. Here, the structure of the YscD cytoplasmic domain solved by SAD phasing is presented. Although the three-dimensional structure is similar to those of forkhead-associated (FHA) domains, comparison with the structures of canonical FHA domains revealed that the cytoplasmic domain of YscD lacks the conserved residues that are required for binding phosphothreonine and is therefore unlikely to function as a true FHA domain.

Lountos, George T.; Tropea, Joseph E.; Waugh, David S. (SAIC); (NCI)

2012-09-17T23:59:59.000Z

310

A total risk assessment methodology for security assessment.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

2009-06-01T23:59:59.000Z

311

Advanced Network Toolkit for Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Toolkit for Assessments Network Toolkit for Assessments and Remote Mapping (ANTFARM) Uses existing information to passively map control systems networks and identify cyber security perimeters Control systems operators require a map of their energy control system network in order to identify its electronic security perimeter, critical to meeting the North American Electric Reliability Corporation's (NERC) Critical Infrastructure Protection (CIP) standards. However, purchasing active, online scanning tools specifically for network mapping can be costly, and these tools can disrupt control system function, causing system latency and possibly affecting power supply. The ANTFARM software tool enables system operators to remotely and

312

Spent Fuel Transportation Risk Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Transportation Risk Assessment Fuel Transportation Risk Assessment (SFTRA) Draft NUREG-2125 Overview for National Transportation Stakeholders Forum John Cook Division of Spent Fuel Storage and Transportation 1 SFTRA Overview Contents * Project and review teams * Purpose and goals * Basic methodology * Improvements relative to previous studies * Draft NUREG structure and format * Routine shipment analysis and results * Accident condition analysis and results * Findings and conclusions * Schedule 2 SFTRA Research and Review Teams * Sandia National Laboratory Research Team [$1.8M; 9/06-9/12] - Doug Ammerman - principal investigator - Carlos Lopez - thermal - Ruth Weiner - RADTRAN * NRC's SFTRA Technical Review Team - Gordon Bjorkman - structural

313

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

314

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

315

Video systems for alarm assessment  

SciTech Connect

The purpose of this NUREG is to present technical information that should be useful to NRC licensees in designing closed-circuit television systems for video alarm assessment. There is a section on each of the major components in a video system: camera, lens, lighting, transmission, synchronization, switcher, monitor, and recorder. Each section includes information on component selection, procurement, installation, test, and maintenance. Considerations for system integration of the components are contained in each section. System emphasis is focused on perimeter intrusion detection and assessment systems. A glossary of video terms is included. 13 figs., 9 tabs.

Greenwoll, D.A.; Matter, J.C. (Sandia National Labs., Albuquerque, NM (United States)); Ebel, P.E. (BE, Inc., Barnwell, SC (United States))

1991-09-01T23:59:59.000Z

316

Health impact assessment in Korea  

Science Conference Proceedings (OSTI)

Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

Kang, Eunjeong, E-mail: marchej@kihasa.re.r [Division for Health Promotion Research, Korea Institute for Health and Social Affairs, 268 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu, Seoul (Korea, Republic of); Lee, Youngsoo, E-mail: leeys@kei.re.k [Centre for Environmental Impact Assessment Review, Korea Environment Institute, 290 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu (Korea, Republic of); Harris, Patrick, E-mail: Patrick.harris@unsw.edu.a [Centre for Health Equity Training, Research and Evaluation, part of the UNSW, Research Centre for Primary Health Care and Equity, UNSW, Locked Mail Bag 7103, Liverpool BC, NSW 1981 (Australia); Koh, Kwangwook, E-mail: kwkoh@hanafos.co [Department of Preventive Medicine, Kosin University, 149-1 Dongsam-1-dong, Youngdo-gu, Busan (Korea, Republic of); Kim, Keonyeop, E-mail: pmkky@knu.ac.k [Department of Preventive Medicine, School of Medicine and Department of Public Health, Graduate School of Public Health, KyungPook National University, 101 Dongin 2 , Jung-gu, Daegu (Korea, Republic of)

2011-07-15T23:59:59.000Z

317

Adaptive capacity and its assessment  

SciTech Connect

This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

Engle, Nathan L.

2011-04-20T23:59:59.000Z

318

EA-0931: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-0931: Final Environmental Assessment Center for Molecular Electronics University of Missouri, St. Louis This Environmental Assessment...

319

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

SELENIUM SELENIUM NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. MARCH 1993 Prepared by: Dennis M. Opresko, Ph.D, Chemical Hazard Evaluation Group, Biomedical Environmental Information Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory*, Oak Ridge, Tennessee. Prepared for: Oak Ridge Reservation Environmental Restoration Program. *Managed by Martin Marietta Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400. Selenium is an essential trace element important in many biochemical and physiological processes including the biosynthesis of coenzyme Q (a

320

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Condensed Toxicity Summary for MANGANESE Condensed Toxicity Summary for MANGANESE NOTE: Although the toxicity values presented in these toxicity profiles were correct at the time they were produced, these values are subject to change. Users should always refer to the Toxicity Value Database for the current toxicity values. July 1995 Prepared by A. A. Francis and C. Forsyth, Chemical Hazard Evaluation Group, Biomedical and Environmental Information Analysis Section, Health Sciences Research Division, *, Oak Ridge, Tennessee Prepared for OAK RIDGE RESERVATION ENVIRONMENTAL RESTORATION PROGRAM *Managed by Lockheed Martin Energy Systems, Inc., for the U.S. Department of Energy under Contract No. DE-AC05-84OR21400 Manganese is an essential trace element in humans that can elicit a variety of serious toxic responses upon prolonged exposure to elevated

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Essential Software Architecture  

Science Conference Proceedings (OSTI)

A minor revision to my 2006 book that was written while I worked at NICTA, covering the basics of software architecture for distributed systems.

Gorton, Ian

2011-05-05T23:59:59.000Z

322

Generalized essential telangiectasia  

E-Print Network (OSTI)

patient was started on oral doxycycline and was referred forTreatment with oral doxycycline was initiated. The patient7 weeks of therapy with doxycycline, as might have been

Karen, Julie K; Mengden, Stephanie J; Kamino, Hideko; Shupack, Jerome L

2008-01-01T23:59:59.000Z

323

Generalized essential telangiectasia  

E-Print Network (OSTI)

minocycline, and doxycycline. However, a recent reportMMPs), a trial of doxycycline was initiated since

Spratt, Elizabeth A Gordon; DeFelice, Taylor; O'Reilly, Kathryn; Robinson, Maria; Patel, Rishi R; Sanchez, Miguel

2012-01-01T23:59:59.000Z

324

Assessing Vulnerabilities, Risks, and Consequences of Damage to Critical Infrastructure  

SciTech Connect

Since the publication of 'Critical Foundations: Protecting America's Infrastructure,' there has been a keen understanding of the complexity, interdependencies, and shared responsibility required to protect the nation's most critical assets that are essential to our way of life. The original 5 sectors defined in 1997 have grown to 18 Critical Infrastructures and Key Resources (CIKR), which are discussed in the 2009 National Infrastructure Protection Plan (NIPP) and its supporting sector-specific plans. The NIPP provides the structure for a national program dedicated to enhanced protection and resiliency of the nation's infrastructure. Lawrence Livermore National Laboratory (LLNL) provides in-depth, multi-disciplinary assessments of threat, vulnerability, and consequence across all 18 sectors at scales ranging from specific facilities to infrastructures spanning multi-state regions, such as the Oil and Natural Gas (ONG) sector. Like many of the CIKR sectors, the ONG sector is comprised of production, processing, distribution, and storage of highly valuable and potentially dangerous commodities. Furthermore, there are significant interdependencies with other sectors, including transportation, communication, finance, and government. Understanding the potentially devastating consequences and collateral damage resulting from a terrorist attack or natural event is an important element of LLNL's infrastructure security programs. Our work began in the energy sector in the late 1990s and quickly expanded other critical infrastructure sectors. We have performed over 600 physical assessments with a particular emphasis on those sectors that utilize, store, or ship potentially hazardous materials and for whom cyber security is important. The success of our approach is based on building awareness of vulnerabilities and risks and working directly with industry partners to collectively advance infrastructure protection. This approach consists of three phases: The Pre-Assessment Phase brings together infrastructure owners and operators to identify critical assets and help the team create a structured information request. During this phase, we gain information about the critical assets from those who are most familiar with operations and interdependencies, making the time we spend on the ground conducting the assessment much more productive and enabling the team to make actionable recommendations. The Assessment Phase analyzes 10 areas: Threat environment, cyber architecture, cyber penetration, physical security, physical penetration, operations security, policies and procedures, interdependencies, consequence analysis, and risk characterization. Each of these individual tasks uses direct and indirect data collection, site inspections, and structured and facilitated workshops to gather data. Because of the importance of understanding the cyber threat, LLNL has built both fixed and mobile cyber penetration, wireless penetration and supporting tools that can be tailored to fit customer needs. The Post-Assessment Phase brings vulnerability and risk assessments to the customer in a format that facilitates implementation of mitigation options. Often the assessment findings and recommendations are briefed and discussed with several levels of management and, if appropriate, across jurisdictional boundaries. The end result is enhanced awareness and informed protective measures. Over the last 15 years, we have continued to refine our methodology and capture lessons learned and best practices. The resulting risk and decision framework thus takes into consideration real-world constraints, including regulatory, operational, and economic realities. In addition to 'on the ground' assessments focused on mitigating vulnerabilities, we have integrated our computational and atmospheric dispersion capability with easy-to-use geo-referenced visualization tools to support emergency planning and response operations. LLNL is home to the National Atmospheric Release Advisory Center (NARAC) and the Interagency Modeling and Atmospheric Assessment Center (IMAAC). NA

Suski, N; Wuest, C

2011-02-04T23:59:59.000Z

325

Assessing Energy Resources Webinar Presentation Slides  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides from the DOE Office of Indian Energy webinar on assessing energy resources.

326

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

327

BRITISH COLUMBIA Gully Assessment Procedure  

E-Print Network (OSTI)

strategies and #12;Gully Assessment Procedure Guidebook iv prescriptions designed to accommodate resource).........................................................15 Section 5 Fan Destabilization Potential OPR 37 (1)(c), WLFMR 64 (2)(a......................................30 3. Design and construction of roads across gully systems: when to consult a qualified registered

328

State Energy Data Needs Assessment  

Reports and Publications (EIA)

This report responds to Section 805(d) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-140, requiring the Energy InformationAdministration to assess State-level energy data needs and submit to Congress a plan to address those needs.

Information Center

2009-01-01T23:59:59.000Z

329

Mexico Wind Resource Assessment Project  

Science Conference Proceedings (OSTI)

A preliminary wind energy resource assessment of Mexico that produced wind resource maps for both utility-scale and rural applications was undertaken as part of the Mexico-U.S. Renewable Energy Cooperation Program. This activity has provided valuable information needed to facilitate the commercialization of small wind turbines and windfarms in Mexico and to lay the groundwork for subsequent wind resource activities. A surface meteorological data set of hourly data in digital form was utilized to prepare a more detailed and accurate wind resource assessment of Mexico than otherwise would have been possible. Software was developed to perform the first ever detailed analysis of the wind characteristics data for over 150 stations in Mexico. The hourly data set was augmented with information from weather balloons (upper-air data), ship wind data from coastal areas, and summarized wind data from sources in Mexico. The various data were carefully evaluated for their usefulness in preparing the wind resource assessment. The preliminary assessment has identified many areas of good-to-excellent wind resource potential and shows that the wind resource in Mexico is considerably greater than shown in previous surveys.

Schwartz, M.N.; Elliott, D.L.

1995-05-01T23:59:59.000Z

330

Transformer Efficiency Assessment - Okinawa, Japan  

Science Conference Proceedings (OSTI)

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-08-01T23:59:59.000Z

331

Transformer Efficiency Assessment - Okinawa, Japan  

SciTech Connect

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-05-01T23:59:59.000Z

332

Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment  

SciTech Connect

The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing the extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.

NONE

1995-03-01T23:59:59.000Z

333

Guidelines for Carcinogen Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

P-03/001F P-03/001F March 2005 Guidelines for Carcinogen Risk Assessment Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1. PURPOSE AND SCOPE OF THE GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2. ORGANIZATION AND APPLICATION OF THE GUIDELINES . . . . . . . . . . . 1-3 1.2.1. Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.2. Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1.3. KEY FEATURES OF THE CANCER GUIDELINES .

334

Thoughts on Hazard Assessment (Oct)  

NLE Websites -- All DOE Office Websites (Extended Search)

Hazard Assessment of Chemical Air Hazard Assessment of Chemical Air Contaminants Measured in Residences J.M. Logue, T.E. McKone, M. H. Sherman, B.C. Singer Environmental Energy Technologies Division June 2010 Funding was provided by the U.S. Dept. of Energy Building Technologies Program, Office of Energy Efficiency and Renewable Energy under DOE Contract No. DE-AC02-05CH11231; by the U.S. Dept. of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control through Interagency Agreement I-PHI-01070, and by the California Energy Commission through Contract 500-08-06. LBNL Report Number 3650-E 1 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States

335

Winter Fuels Market Assessment 2000  

Gasoline and Diesel Fuel Update (EIA)

September 13, 2000 September 13, 2000 Winter Fuels Market Assessment 2000 09/14/2000 Click here to start Table of Contents Winter Fuels Market Assessment 2000 West Texas Intermediate Crude Oil Prices Perspective on Real Monthly World Oil Prices, 1976 - 2000 U.S. Crude Oil Stocks Total OECD Oil Stocks Distillate and Spot Crude Oil Prices Distillate Stocks Expected to Remain Low Distillate Stocks Are Important Part of East Coast Winter Supply Consumer Winter Heating Oil Costs Natural Gas Prices: Well Above Recent Averages Annual Real Natural Gas Prices by Sector End-of-Month Working Gas in .Underground Storage Residential Prices Do Not Reflect the Volatility Seen in Wellhead Prices Consumer Natural Gas Heating Costs Winter Weather Uncertainty Author: John Cook Email: jcook@eia.doe.gov

336

Hanford Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment for Medical Surveillance of Needs Assessment for Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

337

SITEWIDE ENVIRONMENTAL ASSESSMENT EA-1008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT EA-1008 for CONTINUED DEVELOPMENT OF NAVAL PETROLEUM RESERVE NO. 3 WR-3) Natrona County, Wyoming Prepared For U.S. Department of Energy Casper, Wyoming July 1995 OISTRIBUTION OF THIS DOCUMENT is UNLIMITED& i Portions of this document be illegible in electronic image products. Images are produced from the best available original dOCUIIlent, c AGENCY: ACTION: DEPARTMENT OF ENERGY Continued Development - Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Continued Development of Naval Petroleum Reserve No. 3 (DOE/EA-1008) SUMMARY: The Secretary of Energy is required by law to "explore, prospect, conserve, develop, use, and operate" the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum

338

Assessment of Project Management Experience  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Applicant Name: Applicant Supervisor: Date (mm/dd/yyyy): Directions: Step 1: Use this template to show project management experience for CEG competency 1.12.2. Rate your experience (0 - 5) in the following project management related activities using the scale below. Step 2: Sign the completed form and have your supervisor review and sign it. Step 3: Once approved by your supervisor, submit the form as part of your Level I certification package. Note: Project management experience is distinguished from FPD experience and applies to general project management activities and experience. Positions that do not count towards experience in project management include: program manager, property manager, health, safety and security (HSS) positions, and

339

INEEL Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Engineering and Environmental Laboratory Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures Appendix C: High Exposure Ranking Matrix

340

INEEL Production Workers Needs Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance Program Surveillance Program at Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Mongolia wind resource assessment project  

DOE Green Energy (OSTI)

The development of detailed, regional wind-resource distributions and other pertinent wind resource characteristics (e.g., assessment maps and reliable estimates of seasonal, diurnal, and directional) is an important step in planning and accelerating the deployment of wind energy systems. This paper summarizes the approach and methods being used to conduct a wind energy resource assessment of Mongolia. The primary goals of this project are to develop a comprehensive wind energy resource atlas of Mongolia and to establish a wind measurement program in specific regions of Mongolia to identify prospective sites for wind energy projects and to help validate some of the wind resource estimates. The Mongolian wind resource atlas will include detailed, computerized wind power maps and other valuable wind resource characteristic information for the different regions of Mongolia.

Elliott, D.; Chadraa, B.; Natsagdorj, L.

1998-09-07T23:59:59.000Z

342

Metal-air battery assessment  

DOE Green Energy (OSTI)

The objective of this report is to evaluate the present technical status of the zinc-air, aluminum/air and iron/air batteries and assess their potential for use in an electric vehicle. In addition, this report will outline proposed research and development priorities for the successful development of metal-air batteries for electric vehicle application. 39 refs., 25 figs., 11 tabs.

Sen, R.K.; Van Voorhees, S.L.; Ferrel, T.

1988-05-01T23:59:59.000Z

343

Applications of Probabilistic Risk Assessment  

SciTech Connect

This report provides a summary of potential and actual applications of Probabilistic Risk Assessment (PRA) technology and insights. Individual applications are derived from the experiences of a number of US nuclear utilities. This report identifies numerous applications of PRA techniques beyond those typically associated with PRAs. In addition, believing that the future use of PRA techniques should not be limited to those of the past, areas of plant operations, maintenance, and financial resource allocation are discussed. 9 refs., 3 tabs.

Burns, K.J.; Chapman, J.R.; Follen, S.M.; O'Regan, P.J. (Yankee Atomic Electric Co., Bolton, MA (USA))

1991-05-01T23:59:59.000Z

344

NIR Inspection and Assessment Technology  

Science Conference Proceedings (OSTI)

Corrosion of the core of ACSR conductors is a key determinant of conductor life, but the detection of this condition is difficult and expensive with currently available technology. While some existing technologies hold promise for enabling a relatively accurate assessment of core wire condition, as defined as the percent remaining galvanization, the currently available techniques are time consuming and expensive. Near-Infrared (NIR) optical spectroscopy may provide a cost-effective rapid scanning techniq...

2008-12-10T23:59:59.000Z

345

Assessment of Water Balance Models  

Science Conference Proceedings (OSTI)

Power generating plants perform water balance studies for a variety of reasons, and they use a range of different modeling approaches and tools to accomplish their specific objectives. This EPRI report presents the results of a project conducted with the objective of providing the industry and the interested public with an assessment of the value of water balance models to conserve and manage water. The report provides an overview of the state-of-the-art water balance models and identifies ...

2013-10-29T23:59:59.000Z

346

Preliminary melter performance assessment report  

Science Conference Proceedings (OSTI)

The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

1994-08-01T23:59:59.000Z

347

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 1, 2009 January 1, 2009 EA-1611: Final Environmental Assessment Interconnection Request for the Colorado Highlands Wind Project January 1, 2009 EA 1647: Supplemental Environmental Assessment Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia December 1, 2008 EA-1643: Final Environmental Assessment 10 CFR 431 Commercial Refrigeration Equipment December 1, 2008 EA-1633: Final Environmental Assessment Green Mountain Reservoir Substitution and Power Interference Agreements December 1, 2008 EA-1624: Final Environmental Assessment Auburn Landfill Gas Electric Generators and Anaerobic Digester Energy Facilities November 3, 2008 EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection

348

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1, 2011 February 1, 2011 EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan February 1, 2011 EA-1700: Final Environmental Assessment Computational Research and Theory Facility Project February 1, 2011 EA-1816: Final Environmental Assessment Town of Hempstead Wind-to-Hydrogen Project, Point Lookout, New February 1, 2011 EA-1815: Final Environmental Assessment Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio February 1, 2011 EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio February 1, 2011 EA-1818: Final Environmental Assessment Pettisville Local Schools Wind Energy Project, Pettisville, Fulton County,

349

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2009 September 4, 2009 EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development September 1, 2009 EA-1584: Final Environmental Assessment Sand Point Wind Installation Project Sand Point, Alaska September 1, 2009 EA-1788: Final Environmental Assessment Sapphire Energy, Inc.'s Integrated Algal Biorefinery (IABR) Facility in Columbus, New Mexico August 3, 2009 EA-1674: Final Environmental Assessment 10 CFR 431 Energy Conservation Program: Energy Conservation Standards for Refrigerated Bottled or Canned Beverage Vending Machines August 3, 2009 EA-1659: Final Environmental Assessment Proposed Demolition of Building 330 at Argonne National Laboratory August 3, 2009 EA-1652: Final Environmental Assessment

350

Vulnerability Assessment Team (VAT) - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Vulnerability Assessment Team Vulnerability Assessment Team VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms

351

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 16, 2011 August 16, 2011 EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah August 15, 2011 EA-1888: Draft Environmental Assessment Old Town Fuel and Fiber Proposed Demonstration-Scale Integrated Biorefinery August 13, 2011 EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin August 12, 2011 EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California August 1, 2011 EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI

352

Development of an Improved Methodology to Assess Potential Unconventional Gas Resources  

Science Conference Proceedings (OSTI)

Considering the important role played today by unconventional gas resources in North America and their enormous potential for the future around the world, it is vital to both policy makers and industry that the volumes of these resources and the impact of technology on these resources be assessed. To provide for optimal decision making regarding energy policy, research funding, and resource development, it is necessary to reliably quantify the uncertainty in these resource assessments. Since the 1970s, studies to assess potential unconventional gas resources have been conducted by various private and governmental agencies, the most rigorous of which was by the United States Geological Survey (USGS). The USGS employed a cell-based, probabilistic methodology which used analytical equations to calculate distributions of the resources assessed. USGS assessments have generally produced distributions for potential unconventional gas resources that, in our judgment, are unrealistically narrow for what are essentially undiscovered, untested resources. In this article, we present an improved methodology to assess potential unconventional gas resources. Our methodology is a stochastic approach that includes Monte Carlo simulation and correlation between input variables. Application of the improved methodology to the Uinta-Piceance province of Utah and Colorado with USGS data validates the means and standard deviations of resource distributions produced by the USGS methodology, but reveals that these distributions are not right skewed, as expected for a natural resource. Our investigation indicates that the unrealistic shape and width of the gas resource distributions are caused by the use of narrow triangular input parameter distributions. The stochastic methodology proposed here is more versatile and robust than the USGS analytic methodology. Adoption of the methodology, along with a careful examination and revision of input distributions, should allow a more realistic assessment of the uncertainty surrounding potential unconventional gas resources.

Salazar, Jesus; McVay, Duane A., E-mail: mcvay@pe.tamu.edu; Lee, W. John [Texas A and M University, Department of Petroleum Engineering, 3116 TAMU (United States)

2010-12-15T23:59:59.000Z

353

National Climate Assessment: Background and Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Background and Process Print E-mail Background and Process Print E-mail Please view the links below to find out more about the background and process of the National Climate Assessment: National Climate Assessment Development & Advisory Committee Charter ( PDF) National Climate Assessment Proposed 2013 Report Outline [updated on 12/08/2011] (PDF) Strategy On May 20th, 2011 the National Climate Assessment released the following two strategy documents: National Climate Assessment Strategy Summary National Climate Assessment Engagement Strategy Federal Register Notices November 18, 2013 National Climate Assessment and Development Advisory Committee (NCADAC) Notice of Open Meeting pdf | html A Notice by the National Oceanic and Atmospheric Administration on 10/29/2013 This notice sets forth the schedule of a forthcoming meeting of the DoC NOAA National Climate Assessment and Development Advisory Committee (NCADAC).

354

Alternative Fuels Data Center: Renewable Fuels Assessment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Renewable Fuels Renewable Fuels Assessment to someone by E-mail Share Alternative Fuels Data Center: Renewable Fuels Assessment on Facebook Tweet about Alternative Fuels Data Center: Renewable Fuels Assessment on Twitter Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Google Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Delicious Rank Alternative Fuels Data Center: Renewable Fuels Assessment on Digg Find More places to share Alternative Fuels Data Center: Renewable Fuels Assessment on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Renewable Fuels Assessment The U.S. Department of Defense (DOD) prepared a report, Opportunities for DOD Use of Alternative and Renewable Fuels, on the use and potential use of

355

Global Forest Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Global Forest Resource Assessment Global Forest Resource Assessment Jump to: navigation, search Tool Summary Name: Global Forest Resource Assessment Agency/Company /Organization: Food and Agriculture Organization of the United Nations Sector: Land Focus Area: Forestry Topics: Resource assessment Resource Type: Publications Website: www.fao.org/forestry/fra/fra2010/en/ Global Forest Resource Assessment Screenshot References: Global Forest Research Assessment[1] Overview "FAO, in cooperation with its member countries, has monitored the world's forests at 5 to 10 year intervals since 1946. These global assessments provide valuable information to policy-makers in countries, to international negotiations, arrangements and organizations related to forests and to the general public. The Global Forest Resources Assessment

356

Home Energy Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assessments Energy Assessments Home Energy Assessments Addthis Description A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Speakers Jason Dispenza Duration 1:44 Topic Home Weatherization Home Energy Audits Consumption Credit Energy Department Video MR. : Core to any energy audit, you've got a blower door test; an infrared camera scan; combustion safety testing for homes with gas

357

O&M Assessments | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Inc. (PECI) presents an overview of O&M assessments for commercial building HVAC, lighting and control systems. It discusses what an O&M assessment involves, how it...

358

Assessment of Farmland Hosting Renewable Energy Systems  

Energy.gov (U.S. Department of Energy (DOE))

In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower...

359

Building Assessment and Energy Coordinator | Princeton Plasma...  

NLE Websites -- All DOE Office Websites (Extended Search)

Opportunities Environment, Safety & Health Procurement Division Technology Transfer Furth Plasma Physics Library Jobs Building Assessment and Energy Coordinator Department:...

360

Assessing Energy Resources Webinar Text Version  

Energy.gov (U.S. Department of Energy (DOE))

Download the text version of the audio from the DOE Office of Indian Energy webinar on assessing energy resources.

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS  

E-Print Network (OSTI)

Renewable Energy Technologies   Transportation   Assessment Department of Energy, Industrial Technologies Program, Department of Energy, Industrial Technologies Program, 

Masanet, Eric

2010-01-01T23:59:59.000Z

362

Guide for Piping Stress Analysis and Assessment  

Science Conference Proceedings (OSTI)

This report gives recommendations for piping analysis methods and integration with inspection and operating data to give estimates of risk and remaining life. The scope of the document is as follows: Objectives of piping assessment Selected literature review of assessment practices for piping and other relevant components Failure modes Inspection and operating data Piping analysis: methods and data Risk assessment Integration of analysis, inspection, and operating data for assessments and recommendations...

2010-12-23T23:59:59.000Z

363

The mediation of environmental assessment's influence: What role for power?  

Science Conference Proceedings (OSTI)

Considerable empirical research has been conducted on why policy tools such as environmental assessment (EA) often appear to have 'little effect' (after Weiss) on policy decisions. This article revisits this debate but looks at a mediating factor that has received limited attention to-date in the context of EA - political power. Using a tripartite analytical framework, a comparative analysis of the influence and significance of power in mediating environmental policy integration is undertaken. Power is analysed, albeit partially, through an exploration of institutions that underpin social order. Empirically, the research examines the case of a new approach to policy-level EA (essentially a form of Strategic Environmental Assessment) developed by the World Bank and its trial application to urban environmental governance and planning in Dhaka mega-city, Bangladesh. The research results demonstrate that power was intimately involved in mediating the influence of the policy EA approach, in both positive (enabling) and negative (constraining) ways. It is suggested that the policy EA approach was ultimately a manifestation of a corporate strategy to maintain the powerful position of the World Bank as a leading authority on international development which focuses on knowledge generation. Furthermore, as constitutive of an institution and reflecting the worldviews of its proponents, the development of a new approach to EA also represents a significant power play. This leads us to, firstly, emphasise the concepts of strategy and intentionality in theorising how and why EA tools are employed, succeed and fail; and secondly, reflect on the reasons why power has received such limited attention to-date in EA scholarship. - Highlights: Black-Right-Pointing-Pointer Conducts empirical research on the neglected issue of power. Black-Right-Pointing-Pointer Employs an interpretation of power in which it is viewed as a productive phenomenon. Black-Right-Pointing-Pointer Analyses the influence of power in the trial application of a new approach to policy environmental assessment. Black-Right-Pointing-Pointer Demonstrates the importance of power dynamics in understanding the successes and failures of environmental assessment.

Cashmore, Matthew, E-mail: cashmore@plan.aau.dk [Danish Centre for Environmental Assessment, Department of Development and Planning, Aalborg University Copenhagen, A.C. Meyers Vaenge 15, DK-2450 Copenhagen SV (Denmark); Axelsson, Anna [Naturskyddsforeningen, Box 4625, 116 91 Stockholm (Sweden)

2013-02-15T23:59:59.000Z

364

Assessment of Residential GSHP System  

SciTech Connect

This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

Liu, Xiaobing [ORNL

2010-09-01T23:59:59.000Z

365

Biomass cogeneration. A business assessment  

DOE Green Energy (OSTI)

This guide serves as an overview of the biomass cogeneration area and provides direction for more detailed analysis. The business assessment is based in part on discussions with key officials from firms that have adopted biomass cogeneration systems and from organizations such as utilities, state and federal agencies, and banks that would be directly involved in a biomass cogeneration project. The guide is organized into five chapters: biomass cogeneration systems, biomass cogeneration business considerations, biomass cogeneration economics, biomass cogeneration project planning, and case studies.

Skelton, J.C.

1981-11-01T23:59:59.000Z

366

Assessment of government tribology programs  

SciTech Connect

An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

Peterson, M.B.; Levinson, T.M.

1985-09-01T23:59:59.000Z

367

Alderwood Area Service Environmental Assessment.  

SciTech Connect

Bonneville Power Administration's (BPA's) proposal to build a new 115-kV transmission line and 115-12.5-kV, 25-MW substation in the Alderwood, Oregon, area is discussed in the attached Environmental Assessment. The proposed substation site has been relocated about 500 feet east of the site outlined in the Environmental Assessment, but in the same field. This is not a substantial change relevant to environmental concerns. Environmental impacts of the new site differ only in that: Two residences will be visually affected. The substation will be directly across Highway 36 from two houses and would be seen in their primary views. This impact will be mitigated by landscaping the substation to create a vegetative screen. To provide access to the new site and provide for Blachly-Lane Cooperative's distribution lines, a 60-foot-wide right-of-way about 200 feet long will be needed. The total transmission line length will be less than originally planned. However, the tapline into the substation will be about 50 feet longer. 4 figs.

United States. Bonneville Power Administration.

1982-06-01T23:59:59.000Z

368

Environmental impact assessment Geopressure Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment (EIA) addresses the expected programmatic activities of the Geopressure Subprogram of the Division of Geothermal Energy. The goal of the Geopressure Subprogram is to stimulate development of geopressured resources as an economic, reliable, operationally safe, and environmentally acceptable energy source. The subprogram includes activities in the areas of engineering research and development; resource exploration, assessment, and development; resource utilization including pilot and demonstration facilities; and environmental research and control technology development. It should be recognized that most of the subprogram activities extend over several years and are in their early stages of implementation at this time. The zones of potential geopressure development are in the region located along the Texas and Louisiana Gulf Coasts extending up to 200 miles (300 km) inland. Geopressured zones are sedimentary basins where water is trapped at high pressures within or below thick, nearly impermeable shale sequences. The confined water supports most or all of the weight of the overburden. This inhibits sediment compaction and causes formation pore pressure to exceed hydrostatic pressure. in sedimentary basins that are underlain by thin oceanic crust, upward thermal conduction from the mantle heats geopressured fluids and sediments to abnormally high temperatures, often in excess of 260 C (500 F).

None

1977-07-01T23:59:59.000Z

369

Issues in using landscape indicators to assess land changes  

SciTech Connect

Landscape indicators, when combined with information about environmental conditions (such as habitat potential, biodiversity, carbon and nutrient cycling, and erosion) and socioeconomic forces, can provide insights about changing ecosystem services. They also provide information about opportunities for improving natural resources management. Landscape indicators rely on data regarding land cover, land management and land functionality. Challenges in using landscape indicators to assess change and effects include (1) measures of land management and attributes that are reliable, robust and consistent for all areas on the Earth do not exist, and thus land cover is more frequently utilized; (2) multiple types of land cover and management are often found within a single landscape and are constantly changing, which complicates measurement and interpretation; and (3) while causal analysis is essential for understanding and interpreting changes in indicator values, the interactions among multiple causes and effects over time make accurate attribution among many drivers of change particularly difficult. Because of the complexity, sheer number of variables, and limitations of empirical data on land changes, models are often used to illustrate and estimate values for landscape indicators, and those models have several problems. Recommendations to improve our ability to assess the effects of changes in land management include refinement of questions to be more consistent with available information and the development of data sets based on systematic measurement over time of spatially explicit land qualities such as carbon and nutrient stocks, water and soil quality, net primary productivity, habitat and biodiversity. Well-defined and consistent land-classification systems that are capable of tracking changes in these and other qualities that matter to society need to be developed and deployed. Because landscapes are so dynamic, it is crucial to develop ways for the scientific community to work together to collect data and develop tools that will enable better analysis of causes and effects and to develop robust management recommendations that will increases land s capacity to meet societal needs in a changing world.

Kline, Keith L [ORNL; Dale, Virginia H [ORNL

2012-01-01T23:59:59.000Z

370

Assessment of gas accumulation and retention -- Tank 241-SY-101  

DOE Green Energy (OSTI)

An approximate analysis has been carried out to assess and estimate the maximum quantity of gas that is likely to be accumulated within waste tank 241-SY-101, and the maximum quantity which is likely to be retained after gas release events (GRE). According to the phenomenological models used for this assessment, based on interpretation of current and recent operational data, the estimated gas generation rate in the tank is approximately 4 m{sup 3}/day (147 ft{sup 3}/day). About half of this gas is released as it is generated, which is (essentially) continuously. The remainder is accumulated within the slurry layer of settled solids at the bottom of the tank, and released episodically in GREs, known as ``burps,`` that are induced by unstable buoyant conditions which develop when sufficient gas accumulates in the slurry. Calculations based on gas volumes to cause neutral buoyancy in the slurry predict the following: the maximum gas accumulation (at 1 atm pressure) that can occur without triggering a GRE is in the range of 606 to 1,039 m{sup 3} (21,400 to 36,700 ft{sup 3}); and the maximum gas retention immediately after a GRE is equal to the maximum accumulation minus the gas released in the GRE. GREs do not necessarily involve all of the slurry. In the largest GREs, which are assumed to involve all of the slurry, the minimum gas release (at 1 atm pressure) is calculated to be in the range of 193 to 328 m{sup 3} (6,800 to 11,600 ft{sup 3}). The corresponding maximum gas retention would be 413 to 711 m{sup 3} (14,600 to 25,100 ft{sup 3}).

Alleman, R.T. [Pacific Northwest Lab., Richland, WA (US); Burke, T.M.; Reynolds, D.A.; Simpson, D.E. [Westinghouse Hanford Co., Richland, WA (US)

1993-03-01T23:59:59.000Z

371

NGNP SITE 2 HAZARDS ASSESSMENT  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

Wayne Moe

2011-10-01T23:59:59.000Z

372

High-impact papers presented in the subject category of water resources in the essential science indicators database of the institute for scientific information  

Science Conference Proceedings (OSTI)

The Essential Science Indicators (ESI) database is widely used to evaluate institutions and researchers. The objective of this study was to analyze trends and characteristics of papers in the subject category of water resources in the ESI database of ... Keywords: ESI, Indicators, Number of countries cited, Number of institutes cited, Number of subject areas cited

Kun-Yang Chuang; Ming-Huang Wang; Yuh-Shan Ho

2011-06-01T23:59:59.000Z

373

Examining the function of the residue C207 in the cysteine desulfurase reaction of an essential NifS-like protein from  

E-Print Network (OSTI)

NifS-like protein from Synechocystis PCC6803 Anthony Paul Trace, McNair Scholar, Pennsylvania State analysis showed the NifS protein is essential to the production of many metalloenzymes, specifically iron Synechocystis sp. PCC 6803 encodes three NifS-like proteins: Slr0077, Slr0387, and Sll0704. Genetic experiments

Omiecinski, Curtis

374

Electrochemical processes (i.e. inter-conversion between electric energy and chemical energy) are essential for rechargeable battery materials. Many  

E-Print Network (OSTI)

) are essential for rechargeable battery materials. Many conversions between structural phases in the electrodes rechargeable battery cell. Both sensitivity and resolution are expected to be improved significantly with our in situ Li ion motion in a battery cell during the charge/discharge process, thus to understand ionic

Weston, Ken

375

What Facilities and Planning is doing for Sustainability... New campus buildings are designed to LEED green standards for the following essential elements  

E-Print Network (OSTI)

What Facilities and Planning is doing for Sustainability... New campus buildings are designed to LEED green standards for the following essential elements for health and livability: Sustainability been submitted for potential Platinum level LEED award. Facilities Project Managers ensure that up

Bertini, Robert L.

376

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 1995 September 28, 1995 EA-0981: Final Environmental Assessment Solid Waste Retrieval Complex, Enhanced Radioactive and Mixed Waste Storage Facility, Infrastructure Upgrades, and Central Waste Support Complex, Hanford Site, Richland, Washington September 22, 1995 EA-1092: Final Environmental Assessment Decontamination and Dismantlement September 8, 1995 EA-1097: Final Environmental Assessment Solid waste Disposal - Nevada Test Site, Nye County, Nevada September 8, 1995 EA-1107: Final Environmental Assessment Construction and Operation of a Office Building at the Stanford Linear Accelerator Center September 8, 1995 EA-1087: Final Environmental Assessment Proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California

377

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2006 , 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington January 2, 2006 EA-1489: Final Environmental Assessment Construction and Operation of the Howard T. Ricketts Laboratory December 1, 2005 EA-1545: Final Environmental Assessment Proposed Withdrawal of Public Lands Within and Surrounding the Calliente Rail Corridor, Nevada December 1, 2005 EA-1538: Final Environmental Assessment Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site November 1, 2005 EA-1523: Final Environmental Assessment Address Proposed Site Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Parish, Louisiana

378

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2011 November 4, 2011 EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) November 1, 2011 EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory Modernization Planning October 31, 2011 EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research Center, Battleground Energy Recovery Project, Deer Park, Harris County, Texas (October 2011) October 28, 2011 EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) October 20, 2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado

379

Dermal Exposure Assessment: Principles and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Health and Health and EPA/600/8-91/011B Environmental Protection Environmental Assessment January 1992 Agency Washington, DC 20460 Interim Report Research and Development Dermal Exposure Assessment: Principles and Applications EPA/600/8 -91/OllB January 1992 Interim Report DERMAL EXPOSURE ASSESSMENT: PRINCIPLES AND APPLICATIONS Exposure Assessment Group Office of Health and Environmental Assessment U.S. Environmental Protection Agency Washington, D.C. 20460 DISCLAIMER This document is an interim report subject to review by the Science Advisory Board. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii

380

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2002 1, 2002 EA-1402: Final Environmental Assessment Methane Energy and Agricultural Development Port of Tillamook Bay Dairy Digester Project, Tillamook County, Oregon December 12, 2001 EA-1321: Final Environmental Assessment Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York December 5, 2001 EA-1391: Final Environmental Assessment Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources September 30, 2001 EA-1383: Final Environmental Assessment Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Technology Needs Assessment Handbook | Open Energy Information  

Open Energy Info (EERE)

Technology Needs Assessment Handbook Technology Needs Assessment Handbook Jump to: navigation, search Tool Summary Name: Technology Needs Assessment Handbook Agency/Company /Organization: United Nations Development Programme Partner: United Nations Environment Programme Sector: Energy, Land Focus Area: Energy Efficiency Topics: Low emission development planning, Background analysis Resource Type: Guide/manual, Training materials, Lessons learned/best practices Website: content.undp.org/go/newsroom/publications/environment-energy/www-ee-li References: TNA Homepage[1] Logo: Technology Needs Assessment Handbook To assist countries, UNDP, in collaboration with Climate Technology Initiative (CTI), the EGTT and the UNFCCC Secretariat, developed a Handbook for conducting technology needs assessments for climate change.

382

Subject no.: 1.4 – Policies and Programmes LIFE CYCLE ASSESSMENT FOR WIND TURBINES  

E-Print Network (OSTI)

ABSTRACT: Tech-wise A/S has conducted a life cycle assessment of a 2 MW offshore wind turbine. A life cycle assessment (LCA), also known as a cradle to grave analysis, is an inventory of all environmental impact of a product, process or service within its complete lifecycle. An LCA includes a recovery of the resources used in the production through the utilisation to the dismantling and disposal of the product. As sample wind turbine a 2 MW offshore wind turbine placed at Horns Rev in the North Sea has been used, since this project is under development and Tech-wise A/S is the main consultant to this project. In this LCA assumptions have been made where there is information about certain materials. The assessment revealed- as expected- that the environmental impact is concentrated in the production and disposal phase. Mainly the use of normal and high-strength steel are contributors. This means that the main impact is found to come from the nacelle and the foundation. Keywords: Environmental Aspects, Off-shore, Materials, Life Cycle Assessment, EDIP-method The results of this LCA will be used to identify the most essential environmental impact in all life phases of a 2 MW offshore wind turbine. This project is the first step in an examination of the possible improvement of the environmental performance of that particular wind turbine and was finalised in spring 2001. The plan is to finalise the next project by the end of 2001.

Henriette Hassing; Søren Varming

2001-01-01T23:59:59.000Z

383

Mission and Readiness Assessment for Fusion Nuclear Facilities  

SciTech Connect

Magnetic fusion development toward DEMO will most likely require a number of fusion nuclear facilities (FNF), intermediate between ITER and DEMO, to test and validate plasma and nuclear technologies and to advance the level of system integration. The FNF mission space is wide, ranging from basic materials research to net electricity demonstration, so there is correspondingly a choice among machine options, scope, and risk in planning such a step. Readiness requirements to proceed with a DEMO are examined, and two FNF options are assessed in terms of the contributions they would make to closing DEMO readiness gaps, and their readiness to themselves proceed with engineering design about ten years from now. An advanced tokamak (AT) pilot plant with superconducting coils and a mission to demonstrate net electricity generation would go a long way toward DEMO. As a next step, however, a pilot plant would entail greater risk than a copper-coil FNSF-AT with its more focussed mission and technology requirements. The stellarator path to DEMO is briefly discussed. Regardless of the choice of FNF option, an accompanying science and technology development program, also aimed at DEMO readiness, is absolutely essential.

G.H. Neilson, et. al.

2012-12-12T23:59:59.000Z

384

An Initial Assessment of Hanford Impact Performed with the System Assessment Capability  

SciTech Connect

The System Assessment Capability is an integrated system of computer models and databases to assess the impact of waste remaining at Hanford. This tool will help decision makers and the public evaluate the cumulative effects of contamination from Hanford. This report describes the results of an initial assessment performed with the System Assessment Capability tools.

Bryce, Robert W.; Kincaid, Charles T.; Eslinger, Paul W.; Morasch, Launa F.

2002-09-27T23:59:59.000Z

385

Uncertainties in risk assessment at USDOE facilities  

Science Conference Proceedings (OSTI)

The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

1994-01-01T23:59:59.000Z

386

Performance Assessment Community of Practice Technical Exchange  

NLE Websites -- All DOE Office Websites (Extended Search)

The Department of Energy is hosting a Technical Exchange at the Hanford Site on The Department of Energy is hosting a Technical Exchange at the Hanford Site on April 13-14, 2010. The Performance Assessment Community of Practice has been chartered to advise the Office of Environmental Management Tank Waste Corporate Board regarding performance assessments and performance assessment-like analyses, promote consistency in the preparation of performance assessments across the Department of Energy (DOE) complex, foster exchange of information among performance assessment practitioners, and develop appropriate guidance for performance assessments such that they are based on sound science and are defensible. The purpose of this technical exchange is to provide a venue for performance assessment and risk assessment practitioners, managers and regulators, and contributors to the Cementitious Barriers Partnership and Advanced Simulation Capability for Environmental Management project to share plans and experiences and share ideas for future performance assessment and risk assessment modeling. The technical exchange will include a combination of plenary presentations and discussions with breakout sessions for specific topics. Discussions will emphasize areas for improved consistency and solicit suggestions for future developments related to modeling tools. A breakout discussion session is also planned to address: DOE Order 435.1 Update, regulatory challenges for performance and risk assessment modeling, and other topical areas. Arrangements have also been made for a GoldSim modeling roundtable at the conclusion of the workshop for participants who are interested in sharing experiences related to the use of GoldSim for their simulations.

387

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 1994 12, 1994 EA-0939: Final Environmental Assessment Blue Creek Winter Range: Wildlife Mitigation Project December 5, 1994 EA-0813: Final Environmental Assessment The Tokamak Fusion Test Reactor Decontamination and Decommissioning Project and the Tokamak Physics Experiment at the Princeton Plasma Physics Laboratory November 15, 1994 EA-1002: Final Environmental Assessment October 27, 1994 EA-0965: Final Environmental Assessment Cancer Research Center Indiana University School of Medicine October 27, 1994 EA-1001: Final Environmental Assessment Commercialization of the Mound Plant October 24, 1994 EA-0952: Final Environmental Assessment The Louisiana State University Waste-to-Energy Incinerator October 20, 1994 EA-0962: Final Environmental Assessment Construction and Routine Operation of a 12-kilovolt Overhead Powerline and

388

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 31, 1996 August 31, 1996 EA-1086: Final Environmental Assessment Amendments to 10 CFR Part 835 (Revised Version - 6/98) August 7, 1996 EA-1160: Final Environmental Assessment Northeast Oregon Wildlife Mitigation Project July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic) July 15, 1996 EA-1149: Final Environmental Assessment Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 1, 1996 EA-1068: Final Programmatic Environmental Assessment State Energy Conservation Program May 21, 1996 EA-1093: Final Environmental Assessment Surface Water Drainage System

389

Oak Ridge Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

390

National Climate Assessment: Indicators System  

NLE Websites -- All DOE Office Websites (Extended Search)

Indicators System Print E-mail Indicators System Print E-mail What are the goals for the NCA indicators? The vision for the National Climate Assessment (NCA) is to create a system of indicators that will help inform policy-makers and citizens understand key aspects of our changing climate. Scientific information about physical climate conditions, climate impacts, vulnerabilities, and preparedness will be tracked and compiled. These measures are called indicators. The goals of the Indicators System are to: Provide meaningful, authoritative climate-relevant measures about the status, rates, and trends of key physical, ecological, and societal variables and values Inform decisions on management, research, and education at regional to national scales Identify climate-related conditions and impacts to help develop effective mitigation and adaptation measures

391

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Area CPM User's Guide Area CPM User's Guide 1. Introduction Field sampling has the potential to be an extremely time-consuming and expensive portion of a radiological site remediation. Collected samples must be shipped to an off-site laboratory or counted in an on-site mobile unit in order to establish areas of contamination and to ensure that acceptable residual levels of contaminants remain. The Area CPM Calculator is a web-based calculator that estimates a gamma detector response for a target level of surface contamination. This calculator provides a rapid, exceptionally cost-effective assessment of contamination and cleanup standards based on field instrument data, which minimizes the use of more expensive sample collection and laboratory analysis. A correction factor for cpm analysis established between this

392

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Frequently Asked Questions Frequently Asked Questions This page represents the most commonly approached topics from our users. What internet browser works best for the RAIS? We attempt to accommodate every browser. If there is a problem viewing the RAIS pages or downloading items, let us know what browser you are using and we will try and fix the problem. How can I use the information on the RAIS? The information on the RAIS can be used for teaching material and performing risk assessments that comply with EPA guidance. Feel free to use the information; it is available to the public. However, please give proper credit to the RAIS and the team from Oak Ridge National Laboratory and The University of Tennessee where you see fit. Also, the databases we maintain are updated on a quarterly basis or sooner, so you may need to "time-stamp"

393

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Glossary of Environmental Restoration Terms Glossary of Environmental Restoration Terms These definitions are from the United States Department of Energy (DOE) Oak Ridge Operations Office (ORO) Environmental Restoration/Waste Management Risk Assessment Program staff and affiliates and the following sources: Click on the letter that begins the term for which you are searching. To search for another term, at the end of each definition, click on the. If a link leaves the glossary to go to an outside page you will see a. A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Abatement: The reduction in degree or intensity of pollution. Absorbed Dose: The energy imparted to a unit mass of matter by ionizing radiation. The unit of absorbed dose is the rad or gray. One rad equals 100 ergs per gram. The amount of a substance absorbed into the body, usually

394

Hanford Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

395

Hydropower Resource Assessment Modeling Results  

DOE Green Energy (OSTI)

The Hydropower Evaluation Software uses the Federal Energy Regulatory Commission?s Hydroelectric Power Resource Assessment database to identify sites with undeveloped hydropower capacity and the estimated megawatts of undeveloped capacity at each site. The software integrates this information with environmental values from the National Park Service?s National Rivers Inventory database. Other constraints to development that are modeled include Federal and state legislative protection for river segments that have been identified as being wild and scenic river segments. River segments containing threatened and/or endangered wildlife and fish are also modeled for their influence on hydropower development. The amount that each attribute affects the likelihood of development is dependent on the prior development of a site.

A. M. Conner; J. E. Francfort

1999-07-06T23:59:59.000Z

396

Climate impacts of bioenergy: Inclusion of carbon cycle and albedo dynamics in life cycle impact assessment  

SciTech Connect

Life cycle assessment (LCA) can be an invaluable tool for the structured environmental impact assessment of bioenergy product systems. However, the methodology's static temporal and spatial scope combined with its restriction to emission-based metrics in life cycle impact assessment (LCIA) inhibits its effectiveness at assessing climate change impacts that stem from dynamic land surface-atmosphere interactions inherent to all biomass-based product systems. In this paper, we focus on two dynamic issues related to anthropogenic land use that can significantly influence the climate impacts of bioenergy systems: i) temporary changes to the terrestrial carbon cycle; and ii) temporary changes in land surface albedo-and illustrate how they can be integrated within the LCA framework. In the context of active land use management for bioenergy, we discuss these dynamics and their relevancy and outline the methodological steps that would be required to derive case-specific biogenic CO{sub 2} and albedo change characterization factors for inclusion in LCIA. We demonstrate our concepts and metrics with application to a case study of transportation biofuel sourced from managed boreal forest biomass in northern Europe. We derive GWP indices for three land management cases of varying site productivities to illustrate the importance and need to consider case- or region-specific characterization factors for bioenergy product systems. Uncertainties and limitations of the proposed metrics are discussed. - Highlights: Black-Right-Pointing-Pointer A method for including temporary surface albedo and carbon cycle changes in Life Cycle Impact Assessment (LCIA) is elaborated. Black-Right-Pointing-Pointer Concepts are applied to a single bioenergy case whereby a range of feedstock productivities are shown to influence results. Black-Right-Pointing-Pointer Results imply that case- and site-specific characterization factors can be essential for a more informed impact assessment. Black-Right-Pointing-Pointer Uncertainties and limitations of the proposed methodologies are elaborated.

Bright, Ryan M., E-mail: ryan.m.bright@ntnu.no; Cherubini, Francesco; Stromman, Anders H.

2012-11-15T23:59:59.000Z

397

Gulf Coast Programmatic Environmental Assessment Geothermal Well Testing: The Frio Formation of Texas and Louisiana  

DOE Green Energy (OSTI)

In accordance with the requirements of 10 CFR Part 711, environmental assessments are being prepared for significant activities and individual projects of the Division of Geothermal Energy (DGE) of the Energy Research and Development Administration (ERDA). This environmental assessment of geopressure well testing addresses, on a regional basis, the expected activities, affected environments, and possible impacts in a broad sense. The specific part of the program addressed by this environmental assessment is geothermal well testing by the take-over of one or more unsuccessful oil wells before the drilling rig is removed and completion of drilling into the geopressured zone. Along the Texas and Louisiana Gulf Coast (Plate 1 and Overlay) water at high temperatures and high pressures is trapped within Gulf basin sediments. The water is confined within or below essentially impermeable shale sequences and carries most or all of the overburden pressure. Such zones are referred to as geopressured strata. These fluids and sediments are heated to abnormally high temperatures (up to 260 C) and may provide potential reservoirs for economical production of geothermal energy. The obvious need in resource development is to assess the resource. Ongoing studies to define large-sand-volume reservoirs will ultimately define optimum sites for drilling special large diameter wells to perform large volume flow production tests. In the interim, existing well tests need to be made to help define and assess the resource. The project addressed by this environmental assessment is the performance of a geothermal well test in high potential geothermal areas. Well tests involve four major actions each of which may or may not be required for each of the well tests. The four major actions are: site preparation, drilling a salt-water disposal well, actual flow testing, and abandonment of the well.

None

1977-10-01T23:59:59.000Z

398

Creating a culture of assessment: A catalyst for organizational change  

E-Print Network (OSTI)

Culture of Assessment: A Catalyst for Organizational ChangeCulture of Assessment: A Catalyst for Organizational ChangeCulture of Assessment: A Catalyst for Organizational Change

Lakos, Amos; Phipps, Shelley

2004-01-01T23:59:59.000Z

399

EA-1649: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Final Environmental Assessment EA-1649: Final Environmental Assessment Sabine Pass LNG, Export Project This EA assesses the environmental effects of the proposed modifications...

400

Idaho National Laboratory Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Laboratory Needs Assessment Idaho National Laboratory Needs Assessment October 1998 This Needs Assessment for former Idaho National Laboratory production workers was...

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EA-1904: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the environmental...

402

EA-0893: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Assessment EA-0893: Final Environmental Assessment Gazes Cardiac Research Institute Medical University of South Carolina This Environmental Assessment...

403

DOE EVMS Risk Assessment Matrix | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EVMS Risk Assessment Matrix DOE EVMS Risk Assessment Matrix DOEEVMSRISKMATRIX.docx More Documents & Publications Earned Value (EV) Analysis and Project Assessment & Reporting...

404

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

405

Fort Drum integrated resource assessment. Volume 3, Resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

406

PROBABILISTIC SAFETY ASSESSMENT OF OPERATIONAL ACCIDENTS AT THE WASTE ISOLATION PILOT PLANT  

Science Conference Proceedings (OSTI)

This report presents a probabilistic safety assessment of radioactive doses as consequences from accident scenarios to complement the deterministic assessment presented in the Waste Isolation Pilot Plant (WIPP) Safety Analysis Report (SAR). The International Council of Radiation Protection (ICRP) recommends both assessments be conducted to ensure that ''an adequate level of safety has been achieved and that no major contributors to risk are overlooked'' (ICRP 1993). To that end, the probabilistic assessment for the WIPP accident scenarios addresses the wide range of assumptions, e.g. the range of values representing the radioactive source of an accident, that could possibly have been overlooked by the SAR. Routine releases of radionuclides from the WIPP repository to the environment during the waste emplacement operations are expected to be essentially zero. In contrast, potential accidental releases from postulated accident scenarios during waste handling and emplacement could be substantial, which necessitates the need for radiological air monitoring and confinement barriers (DOE 1999). The WIPP Safety Analysis Report (SAR) calculated doses from accidental releases to the on-site (at 100 m from the source) and off-site (at the Exclusive Use Boundary and Site Boundary) public by a deterministic approach. This approach, as demonstrated in the SAR, uses single-point values of key parameters to assess the 50-year, whole-body committed effective dose equivalent (CEDE). The basic assumptions used in the SAR to formulate the CEDE are retained for this report's probabilistic assessment. However, for the probabilistic assessment, single-point parameter values were replaced with probability density functions (PDF) and were sampled over an expected range. Monte Carlo simulations were run, in which 10,000 iterations were performed by randomly selecting one value for each parameter and calculating the dose. Statistical information was then derived from the 10,000 iteration batch, which included 5%, 50%, and 95% dose likelihood, and the sensitivity of each assumption to the calculated doses. As one would intuitively expect, the doses from the probabilistic assessment for most scenarios were found to be much less than the deterministic assessment. The lower dose of the probabilistic assessment can be attributed to a ''smearing'' of values from the high and low end of the PDF spectrum of the various input parameters. The analysis also found a potential weakness in the deterministic analysis used in the SAR, a detail on drum loading was not taken into consideration. Waste emplacement operations thus far have handled drums from each shipment as a single unit, i.e. drums from each shipment are kept together. Shipments typically come from a single waste stream, and therefore the curie loading of each drum can be considered nearly identical to that of its neighbor. Calculations show that if there are large numbers of drums used in the accident scenario assessment, e.g. 28 drums in the waste hoist failure scenario (CH5), then the probabilistic dose assessment calculations will diverge from the deterministically determined doses. As it is currently calculated, the deterministic dose assessment assumes one drum loaded to the maximum allowable (80 PE-Ci), and the remaining are 10% of the maximum. The effective average of drum curie content is therefore less in the deterministic assessment than the probabilistic assessment for a large number of drums. EEG recommends that the WIPP SAR calculations be revisited and updated to include a probabilistic safety assessment.

Rucker, D.F.

2000-09-01T23:59:59.000Z

407

Climate VISION: Resources and Links - Plant Assessments  

Office of Scientific and Technical Information (OSTI)

Plant Assessments Plant Assessments Plant-Wide Assessments Plant-wide assessments are one way to work with the DOE Industrial Technologies Program—most companies realize a minimum of $1 million in annual energy savings after just one assessment. Plants are selected through a competitive solicitation process, and agree to a minimum 50% cost-share for implementing the assessment. An industry-defined team conducts an on-site analysis of total energy use and identifies opportunities to save energy in your overall operations and in motor, steam, compressed air, and process heating systems. The recommendations could include implementing emerging technologies that would be particularly effective in your operation. These emerging technologies, although on the forefront of industrial manufacturing, are successful and commercially

408

Environmental Assessments (EA) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD December 19, 2013 EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky November 15, 2013 EA-1752: Draft Environmental Assessment

409

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

410

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27, 1998 27, 1998 EA-1236: Final Site-Wide Environmental Assessment Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, Wyoming December 1, 1997 EA-1175: Final Environmental Assessment Proposed Title Transfer of East Tennessee Park Land and Facilities November 21, 1997 EA-1170: Final Environmental Assessment Area 5 Radioactive Waste Management Site Access Improvement at the Nevada Test Site October 16, 1997 EA-1219: Final Environmental Assessment Hoe Creek Underground Coal Gasification Test Site Remediation October 8, 1997 EA-1212: Final Environmental Assessment Lease of Land for the Development of a Research Park at Los Alamos National Laboratory July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

411

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit (Redirected from Gateway:International/Economic and Environmental Impacts) Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other

412

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 1, 2012 March 1, 2012 EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN February 29, 2012 EA-1884: Draft Environmental Assessment Wray Wind Energy Project, Town of Wray, Yuma County, CO February 29, 2012 EA-1909: Draft Environmental Assessment South Table Wind Project, Kimball County, Nebraska February 13, 2012 EA-1779: Final Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN February 13, 2012 EA-1779: Finding of No Significant Impact and Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN January 25, 2012 EA-1722-SA-001: Supplement Analysis for an Environmental Assessment

413

Resource Assessment and Characterization | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Assessment and Characterization Resource Assessment and Characterization Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the total technically recoverable energy available in the nation's powered dams, non-powered dams, and untapped stream-reaches. These resource assessments are pivotal to understanding hydropower's potential for future electricity production. Hydropower already provides 6-8% of the nation's electricity, but more potential resides in our flowing waters to provide clean electricity to communities and cities across the United States. There are three levels of resource assessments performed by the water industry. Theoretical potential is the annual average amount of physical energy that is hypothetically available. Technical resource potential is

414

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2010 August 2, 2010 EA-1729: Final Environmental Assessment Removal Actions At The Technical Area III Classified Waste Landfill, Sandia National Laboratories, New Mexico July 1, 2010 EA-1743: Final Environmental Assessment Air Products And Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio July 1, 2010 EA-1740: Final Environmental Assessment Thermal Energy Corporation Combined Heat And Power Project, Houston, Texas July 1, 2010 EA-1698: Final Environmental Assessment Baldwin Wind Energy Center July 1, 2010 EA-1696: Final Environmental Assessment Pantex Renewable Energy Project June 25, 2010 EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire June 16, 2010 EA-1741: Draft Environmental Assessment

415

Land Use Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Land Use Assessment Toolkit Land Use Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

416

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2011 June 1, 2011 EA-1848: Final Environmental Assessment Loan Guarantee To Fulcrum Sierra Biofuels, LLC For A Waste-To-Ethanol Facility In Mccarran, Storey County, Nevada June 1, 2011 EA-1858: Final Environmental Assessment Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington June 1, 2011 EA-1875: Final Environmental Assessment Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine May 31, 2011 EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado May 27, 2011 EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine May 17, 2011 EA-1731: Final Environmental Assessment

417

A Resilient Condition Assessment Monitoring System  

SciTech Connect

An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

2012-08-01T23:59:59.000Z

418

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 18, 2013 February 18, 2013 EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho February 12, 2013 EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri February 1, 2013 EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho January 17, 2013 EA-1944: Final Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA January 15, 2013 EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the

419

Bioenergy Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

420

GEOTECHNICAL ASSESSMENT AND INSTRUMENTATION NEEDS FOR NUCLEAR WASTE ISOLATION IN CRYSTALLINE AND ARGILLACEOUS ROCKS SYMPOSIUM  

E-Print Network (OSTI)

a field test facility is essential and should be developed (Scale Testing Facility An essential part of the developmentessential, however it is accomplished. In addition to laboratory facilities,

Authors, Various

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Tiger Team assessment of the Pinellas Plant  

Science Conference Proceedings (OSTI)

This Document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Pinellas Plant, Pinellas County, Florida. The assessment wa directed by the Department's Office of Environment, Safety, and Health (ES H) from January 15 to February 2, 1990. The Pinellas Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environment Safety and Health, and Management areas and determines the plant's compliance with applicable Federal (including DOE), State, and local regulations and requirements.

Not Available

1990-05-01T23:59:59.000Z

422

Scientific analysis is essential to assess biofuel policy effects: in response to the paper by Kim and Dale on "Indirect land use change for biofuels: Testing predictions and improving analytical methodologies"  

SciTech Connect

Vigorous debate on the effects of biofuels derives largely from the changes in land use estimated using economic models designed mainly for the analysis of agricultural trade and markets. The models referenced for land-use change (LUC) analysis in the U.S. Environmental Protection Agency Final Rule on the Renewable Fuel Standard include GTAP, FAPRI-CARD, and FASOM. To address bioenergy impacts, these models were expanded and modified to facilitate simulations of hypothesized LUC. However, even when models use similar basic assumptions and data, the range of LUC results can vary by ten-fold or more. While the market dynamics simulated in these models include processes that are important in estimating effects of biofuel policies, the models have not been validated for estimating land-use changes and employ crucial assumptions and simplifications that contradict empirical evidence.

Kline, Keith L [ORNL; Oladosu, Gbadebo A [ORNL; Dale, Virginia H [ORNL; McBride, Allen [ORNL

2011-01-01T23:59:59.000Z

423

Definitions, Seals - Vulnerability Assessment Team - Nuclear Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Definitions Definitions VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

424

Operations Authorization Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

425

Safety - Vulnerability Assessment Team - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Safety VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

426

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) (Redirected from GCOMAP) Jump to: navigation, search Tool Summary Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

427

EIA-State Energy Data Needs Assessment  

U.S. Energy Information Administration (EIA)

These data could serve missions of Federal energy and transportation agencies by providing a comprehensive data set for assessing energy efficiency and the ...

428

AdaptiVolt(TM) Technology Assessment Report  

Science Conference Proceedings (OSTI)

A technology assessment was conducted for AdaptiVolt and Line Drop Compensation (LDC) technologies for reducing energy consumption and demand by controlling feeder voltage.

2009-03-30T23:59:59.000Z

429

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

430

Useful Resources- Vulnerability Assessment Team - Nuclear Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Selected Publications Selected Publications VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

431

Environmental Impact Statements and Environmental Assessments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clean Energy Project, Ector, Texas August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California...

432

Jefferson City - Property Assessed Clean Energy | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lighting Insulation Other Bioenergy Manufacturing Buying & Making Electricity Solar Wind Program Information Missouri Program Type PACE Financing Property-Assessed Clean Energy...

433

Water Power Program: Resource Assessment and Characterization  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of the United States Ocean Wave Energy Resource This report, created by the Electric Power Research Institute, assesses ocean wave energy potential along the U.S. coasts....

434

Regenerative Burners Assessment in Holding Reverberatory Furnace  

Science Conference Proceedings (OSTI)

The assessment showed that the regenerative burner furnaces are not profitable in saving energy in addition to the negative impact on the furnace life.

435

Demand Response Quick Assessment Tool (DRQAT)  

NLE Websites -- All DOE Office Websites (Extended Search)

Demand Response Quick Assessment Tool (DRQAT) The opportunities for demand reduction and cost saving with building demand responsive control vary tremendously with building type...

436

Environmental Assessment for Conducting Astrophysics and Other...  

NLE Websites -- All DOE Office Websites (Extended Search)

340 Department of Energy Carlsbad Field Office Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site Final January 2001 U.S....

437

Lawrence Livermore National Laborotory Safety Basis Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and implementation of safety basis documentation and execution of the unreviewed safety question (USQ) process. SCOPE The scope of this assessment includes the plans,...

438

Assessment of Preferred Depleted Uranium Disposal Forms  

NLE Websites -- All DOE Office Websites (Extended Search)

. . 7 3.2 PRELIMINARY ASSESSMENT OF DU DISPOSAL AT OTHER SITES . . . . . . . . . . 8 3.3 COSTS OF PRODUCTION, TRANSPORTATION, AND DISPOSAL OF DU WASTE FORMS . . . . . . . . . . ....

439

Evaluation of Electric Field Exposure Assessment Methods  

Science Conference Proceedings (OSTI)

This evaluation of electric field exposure assessment methods highlights a renewed interest in characterizing electric field exposures and their attendant perceptible nuisance shocks.

2008-09-26T23:59:59.000Z

440

Independent Oversight Assessment, Los Alamos National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2012 Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project The U.S. Department of Energy (DOE)...

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1997 This Needs Assessment for former Hanford production workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes...

442

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing information relevant to exposure and health outcomes...

443

Independent Oversight Assessment of Environmental Monitoring...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Environmental Monitoring at the Idaho National Laboratory Site May 2010 Office of Independent Oversight Office of Health, Safety and Security Office of Health, Safety...

444

Seals Applications - Vulnerability Assessment Team - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Physical Security Maxims Read the Security Maxims Devil's Dictionary of Security Terms For more information: Vulnerability Assessment Section Sect. Manager: Roger G....

445

Assessing Climate Change Impacts, Vulnerability and Adaptation...  

Open Energy Info (EERE)

The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan...

446

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance (QA) assessment schedule for the remainder of fiscal year (FY) 2010.

447

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations January 1, 2003 EA-1394: Final Environmental Assessment Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear...

448

Independent Oversight Assessment , Idaho National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), performed an assessment of environmental monitoring and surveillance at...

449

Supplemnental Volume - Independent Oversight Assessment of the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant...

450

Seals References - Vulnerability Assessment Team - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure) The (In)Security of Drug Testing VAT in...

451

Plug-In Hybrid Electric Vehicles - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

EPRI and Argonne Assess Commercial Viability of Plug-In Hybrid Electric Vehicles The Electric Power Research Institute (EPRI) and Argonne National Laboratory are engaged in a...

452

Life Cycle Assessment of Wood Pellet.  

E-Print Network (OSTI)

??The primary purpose of this project is to assess the environmental impacts associated with the wood pellet production. The study has extended to the entire… (more)

Chen, Siyu

2009-01-01T23:59:59.000Z

453

Assessment of the Cheng Simplified Combined Cycle  

Science Conference Proceedings (OSTI)

This report will help resource planners assess the cost-effectiveness of retrofitting increased steam injection to a cogeneration plant or power station with gas turbines.

2010-12-17T23:59:59.000Z

454

Environmentally Assisted Cracking Susceptibility Assessment of AP ...  

Science Conference Proceedings (OSTI)

Presentation Title, Environmentally Assisted Cracking Susceptibility Assessment of AP 1000 Reactor Coolant Pump Flywheel Retainer Ring A289 18Cr-18Mn ...

455

PRIVACY IMPACT ASSESSMENT: OCIO HSPD-12 Physical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessments, for requirements and additional guidance for conducting a PIA: http:www.directives.doe.govpdfsdoedoetextlneword206o2061.pdf Please complete electronically:...

456

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York March 1, 2012 EA-1809:...

457

Detailed Renewable Energy Resource Assessment Data Inventory...  

Open Energy Info (EERE)

(national, regional, and site specific). Assessments are available for biomass and hydropower resources at a national level, with only limited information available at the...

458

ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Assessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of Building Energy- Saving Policies and Programs in China During the 11th Five Year Plan Nan Zhou, Michael Mcneil and Mark Levine Energy Analysis Department...

459

RADIOLOGICAL ASSESSMENT OF BALLOD AND ASSOCIATES PROPERTY  

Office of Legacy Management (LM)

Cotton, Robert Gosslee, Jonathan Sowell, Clayton Weaver FINAL REPORT July 30, 1981 Work performed by Radiological Site Assessment Program Manpower Education, Research, and...

460

Industrial Energy Efficiency Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

about the Industrial Energy Efficiency Assessments program and its implementation in China. session2industrytrackpriceen.pdf session2industrytrackpricecn.pdf More...

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Current Projects: GPS Spoofing - Vulnerability Assessment Team...  

NLE Websites -- All DOE Office Websites (Extended Search)

References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure) The...

462

Technical Report - Cuba Wind Energy Resource Assessment  

Open Energy Info (EERE)

Cuba Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

463

Technical Report - China Wind Energy Resource Assessment  

Open Energy Info (EERE)

China Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

464

Technical Report - Ghana Wind Energy Resource Assessment  

Open Energy Info (EERE)

Ghana Wind Energy Resource Assessment (Abstract):  This document describes the development of detailed high-resolution (1 km2) wind energy resource maps for...

465

On environmental lifecycle assessment for policy selection  

E-Print Network (OSTI)

rst and second generation biofuel targets. Energy Policy,Land clearing and the biofuel carbon debt. Science, 319(Life cycle assessment of biofuel greenhouse gas emissions

Rajagopal, Deepak

2010-01-01T23:59:59.000Z

466

Live Fire Range Environmental Assessment  

SciTech Connect

The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

None

1993-08-01T23:59:59.000Z

467

Assessing Hypothetical Gravity Control Propulsion  

E-Print Network (OSTI)

Gauging the benefits of hypothetical gravity control propulsion is difficult, but addressable. The major challenge is that such breakthroughs are still only notional concepts rather than being specific methods from which performance can be rigorously quantified. A recent assessment by Tajmar and Bertolami used the rocket equation to correct naive misconceptions, but a more fundamental analysis requires the use of energy as the basis for comparison. The energy of a rocket is compared to an idealized space drive for the following cases: Earth-to-orbit, interstellar transit, and levitation. The space drive uses 3.6 times less energy for Earth to orbit. For deep space travel, space drive energy scales as the square of delta-v, while rocket energy scales exponentially. This has the effect of rendering a space drive 150-orders-of-magnitude better than a 17,000-sec Specific Impulse rocket for sending a modest 5000 kg probe to traverse 5 light-years in 50 years. Indefinite levitation, which is impossible for a rocket, could conceivably require 62 MJ/kg for a space drive. Assumption sensitivities and further analysis options are listed to guide further inquires.

Marc G. Millis

2006-03-14T23:59:59.000Z

468

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Radionuclide Decay Chain Radionuclide Decay Chain Using the Radionuclide Decay Chain Tool Click on the steps below for detailed instructions about each page of the Radionuclide Chain Tool. 1. Select Isotope 2. Decay Chain Table 3. Decay Chain Animation 1. Select Isotope Select the isotope of interest and click the "Submit" button. 2. Decay Chain Table A table of the ICRP 107 decay chain appears that displays the parent and all daughters in the decay chain through the stable isotope(s). The half-life, decay modes, and the branching fractions are given. Decay chains that are repeated as a result of multiple branching fractions are only presented once in the table. Text below the decay chain table contains decay mode definitions and further information on the daughters included in the +D slope factors for risk assessment purposes. A back button is provided to return to the main page. To watch an animated representation of the decay process, click the link "Click for visual diagram."

469

Fort Drum integrated resource assessment  

Science Conference Proceedings (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

470

NASA BENCHMARKS COMMUNICATIONS Assessment Plan NNSA/Nevada Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Plan NNSANevada Site Office Facility Representative Division NASA BENCHMARKS COMMUNICATIONS Assessment Plan NNSANevada Site Office Facility Representative...

471

EA-1116: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-1116: Final Environmental Assessment Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada This EA evaluates the environmental...

472

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

473

EA-1483: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1483: Final Environmental Assessment Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory; East Argonne, Illinois...

474

EA-0429: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington This environmental...

475

Proliferation and Terrorism Risk Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Terrorism Risk Assessment Proliferation and Terrorism Risk Assessment Nuclear Reactor Technologies Fuel Cycle Technologies International Nuclear Energy Policy and...

476

The Essential Role of Radiotherapy in the Treatment of Merkel Cell Carcinoma: A Study From the Rare Cancer Network  

SciTech Connect

Purpose: To evaluate the role of postoperative radiotherapy (RT) in Merkel cell carcinoma (MCC). Methods and Materials: A retrospective multicenter study was performed in 180 patients with MCC treated between February 1988 and September 2009. Patients who had had surgery alone were compared with patients who received surgery and postoperative RT or radical RT. Local relapse-free survival (LRFS), regional relapse-free survival (RRFS), and distant metastasis-free survival (DMFS) rates were assessed together with disease-free survival (DFS), cancer-specific survival (CSS), and overall survival (OS) rates. Results: Seventy-nine patients were male and 101 patients were female, and the median age was 73 years old (range, 38-93 years). The majority of patients had localized disease (n = 146), and the remaining patients had regional lymph node metastasis (n = 34). Forty-nine patients underwent surgery for the primary tumor without postoperative RT to the primary site; the other 131 patients received surgery for the primary tumor, followed by postoperative RT (n = 118) or a biopsy of the primary tumor followed by radical RT (n = 13). Median follow-up was 5 years (range, 0.2-16.5 years). Patients in the RT group had improved LRFS (93% vs. 64%; p < 0.001), RRFS (76% vs. 27%; p < 0.001), DMFS (70% vs. 42%; p = 0.01), DFS (59% vs. 4%; p < 0.001), and CSS (65% vs. 49%; p = 0.03) rates compared to patients who underwent surgery for the primary tumor alone; LRFS, RRFS, DMFS, and DFS rates remained significant with multivariable Cox regression analysis. However OS was not significantly improved by postoperative RT (56% vs. 46%; p = 0.2). Conclusions: After multivariable analysis, postoperative RT was associated with improved outcome and seems to be an important component in the multimodality treatment of MCC.

Ghadjar, Pirus, E-mail: pirus.ghadjar@insel.ch [Department of Radiation Oncology, Inselspital, Bern University Hospital, and University of Bern (Switzerland); Kaanders, Johannes H. [Department of Radiation Oncology, Radboud University Nijmegen Medical Centre, Institute of Oncology (Netherlands); Poortmans, Philipp [Department of Radiation Oncology, Institute Verbeeten, Tilburg (Netherlands); Zaucha, Renata [Department of Oncology and Radiotherapy, Medical University, Gdansk (Poland); Krengli, Marco [Department of Radiotherapy, University Hospital Maggiore della Carita, Novara (Italy); Lagrange, Jean L. [Service de Radiotherapie, Hopital Henri-Mondor, Creteil (France); Oezsoy, Orhan [Department of Radiation Oncology, CHCVs-RSV, Sion (Switzerland); Nguyen, Tan D. [Department of Radiation Oncology, Institut Jean Godinot, Reims (France); Miralbell, Raymond [Department of Radiation Oncology, Hopitaux Universitaires de Geneve, Geneva (Switzerland); Baize, Adele [Department de Radio-Oncologie, Institut Jules Bordet, Bruxelles (Belgium); Boujelbene, Noureddine [Department of Radiation Oncology, Centre Hospitalier Universitaire Vaudois, Lausanne (Switzerland); Collen, Timothy [Department of Radiation Oncology, Kantonsspital St. Gallen (Switzerland); Scandolaro, Luciano [Radioterapia, Azienda Ospedale Sant' Anna, Como (Italy); Untereiner, Michel [Centre Francois Baclesse, Luxembourg (Luxembourg); Goldberg, Hadassah [Oncology Departement, Rambam Medical Center, Haifa (Israel); Pesce, Gianfranco A. [Department of Radiation Oncology, Oncology Institute of Southern Switzerland, Opedale San Giovanni, Bellinzona (Switzerland); Anacak, Yavuz [Department of Radiation Oncology, EGE University, Izmir (Turkey); Friedrich, Esther E.; Aebersold, Daniel M. [Department of Radiation Oncology, Inselspital, Bern University Hospital, and University of Bern (Switzerland); Beer, Karl T. [Radio Onkologiezentrum Biel (Switzerland)

2011-11-15T23:59:59.000Z

477

Environmental Assessment -- Hydrothermal Geothermal Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment addresses the design, construction, and operation of an electric generating plant (3 to 4 MWe) and research station (Hawaii Geothermal Research Station (HGRS)) in the Puna district on the Island of Hawaii. The facility will include control and support buildings, parking lots, cooling towers, settling and seepage ponds, the generating plant, and a visitors center. Research activities at the facility will evaluate the ability of a successfully flow-tested well (42-day flow test) to provide steam for power generation over an extended period of time (two years). In future expansion, research activities may include direct heat applications such as aquaculture and the effects of geothermal fluids on various plant components and specially designed equipment on test modules. Construction-related impacts would be relatively minor. Construction of the facility will require the distance of about 1.7 ha (4.1 acres). No further disturbance is anticipated, unless it becomes necessary to replace the seepage pond with an injection well, because the production well is in service and adjacent roads and transmission lines are adequate. Disruption of competing land uses will be minimal, and loss of wildlife habitat will be acceptable. Noise should not significantly affect wildlife and local residents; the most noise activities (well drilling and flow testing) have been completed. Water use during construction will not be large, and impacts on competing uses are unlikely. Socio-economic impacts will be small because the project will not employ a large number of local residents and few construction workers will need to find local housing.

None

1979-06-01T23:59:59.000Z

478

Self-Assessment Program Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SELF-ASSESSMENT SELF-ASSESSMENT Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: Management should ensure that effective management and independent self- assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect people and

479

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network (OSTI)

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

480

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies  

DOE Green Energy (OSTI)

This survey of biomass resource assessments and assessment capabilities in Asia-Pacific Economic Cooperation (APEC) economies considered various sources: academic and government publications, media reports, and personal communication with contacts in member economies.

Milbrandt, A.; Overend, R. P

2008-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment efh essential" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT Site: Federal or Contractor Program: Name: ____________________________________________ Title:______________________________________________ Organization:_______________________________________ Address: __________________________________________ Bldg and Room Number _____________________________ Phone Number __________________ E-Mail ________________________________ Years of Records Management experience? Length of time in current position? Training? __________________________________________________________________ Signature: Date: 02/03/2010 2 INSTITUTIONALIZATION

482

Seismic Probabilistic Risk Assessment Implementation Guide  

Science Conference Proceedings (OSTI)

BackgroundThis report provides updates to the guidelines and approaches for seismic probabilistic risk assessments (SPRAs) that were published in the initial Electric Power Research Institute (EPRI) report Seismic Probabilistic Risk Assessment Implementation Guide (1002989) in 2003. It provides practical guidelines for SPRA development to support a variety of uses, including risk-informed applications.It is intended that a probabilistic risk ...

2013-12-18T23:59:59.000Z

483

3D Simulations in Environmental Impact Assessment  

Science Conference Proceedings (OSTI)

The increase of petrol cost and the failure of Kyoto agreement generated huge investments in renewable energy sources. In recent times a lot of local authorities allowed wind farm location. In many cases, environmental impact assessments do not take ... Keywords: 3D CAD models, 3D GIS analysis, Multimedia techniques, Viewshed, Visual impact assessment, Wind farm

Maria Danese; Giuseppe Las Casas; Beniamino Murgante

2008-06-01T23:59:59.000Z

484

Space, time and nesting Integrated Assessment Models  

Science Conference Proceedings (OSTI)

Integrated Assessment Modelling in the field of air pollution has advanced greatly since the 1985 Helsinki Protocol on the reduction of Sulphur emissions and their transboundary fluxes. With subsequent protocols and increased understanding of the inter-relationships ... Keywords: CLRTAP, Integrated Assessment Modelling, Scale, Science-policy interaction, Space, Time

T. Oxley; H. M. ApSimon

2007-12-01T23:59:59.000Z

485

Airport risk assessment: a probabilistic approach  

Science Conference Proceedings (OSTI)

Risk reduction is one of the key objectives pursued by transport safety policies. Particularly, the formulation and implementation of transport safety policies needs the systematic assessment of the risks, the specification of residual risk targets and ... Keywords: risk assessment methodology, risk management, safety civil aviation

L. Guerra; T. Murino; E. Romano

2008-05-01T23:59:59.000Z

486

Guideline for Assessing Maintenance Effectiveness: A Self-Assessment Guideline for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The EPRI Technologies for Equipment Assessment and Maintenance (TEAM) group has prepared this guideline to assist EPRI-member nuclear power plants in further improving their maintenance processes by presenting, in detail, a collection of the key elements and activities that contribute to a well-organized maintenance program. An honest assessment of these activities then provides tools that can be used to perform a self-assessment of an existing maintenance program. This assessment is directed toward how ...

2002-12-10T23:59:59.000Z

487

Environmental assessment for the satellite power system concept development and evaluation program: atmospheric effects  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) has undertaken a preliminary, three-year program to investigate the impacts of the construction and operation of a satellite power system, of unprecedented scale. The Department of Energy's program, titled The Concept Development and Evaluation Program, focused its investigations on a Reference System description that calls for the use of either silicon (Si) or gallium aluminum-arsenide (GaAlAs) photovoltaic cells on 60 satellites to be constructed in GEO over a 30-yr period. Rectennas would be constructed on the ground to receive microwave energy from the satellites. Each satellite-rectenna pair is designed to produce 5 GW of power on an essentially continuous basis for use as a baseload power source for an electric power distribution system. The environmental assessment part of the program was divided into five interdependent task areas. The present document constitutes the final technical report on one of the five task areas, the Assessment of the Atmospheric Effects, and as such presents an in-depth summary of work performed during the assessment program. The issues associated with SPS activities in the troposphere are examined. These include tropospheric weather modification related to rectenna operations and rocket launches, and air quality impacts related to rocketlaunch ground clouds. Then progressing upward through the various levels of the atmosphere, the principal middle and upper atmospheric effects associated with rocket effluents are analyzed. Finally, all of the potential SPS atmospheric effects are summarized.

Rote, D.M.; Brubaker, K.L.; Lee, J.L.

1980-11-01T23:59:59.000Z

488

Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Testing Activity, Frio Formation, Texas and Louisiana  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) has been prepared to provide the environmental input into the Division of Geothermal Energy's decisions to expand the geothermal well testing activities to include sites in the Frio Formation of Texas and Louisiana. It is proposed that drilling rigs be leased before they are removed from sites in the formation where drilling for gas or oil exploration has been unsuccessful and that the rigs be used to complete the drilling into the geopressured zone for resource exploration. This EA addresses, on a regional basis, the expected activities, affected environment, and the possible impacts in a broad sense as they apply to the Gulf Coast well testing activity of the Geothermal Energy Geopressure Subprogram of the Department of Energy. Along the Texas and Louisiana Gulf Coast (Plate 1 and Overlay, Atlas) water at high temperatu