Sample records for assessment cheyenne-miracle mile

  1. Final Environmental Assessment for the Cheyenne-Miracle Mile...

    Broader source: Energy.gov (indexed) [DOE]

    List of Acronyms ACSR Aluminum conductor steel reinforced AM amplitude modulated APCD Air Pollution Control Division AQD Air Quality Division ARH-AU Archer-Ault AU-CH...

  2. EA-1456: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines...

  3. EA-1456: Finding of No Signficant Impact

    Broader source: Energy.gov [DOE]

    Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado

  4. Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

  5. Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico

    SciTech Connect (OSTI)

    N /A

    2003-11-03T23:59:59.000Z

    The National Environmental Policy Act of 1969 (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA), follows the Council on Environmental Quality regulations (40 CFR 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an environmental impact statement (EIS) or issue a Finding of No Significant Impact. Los Alamos National Laboratory (LANL) is a national security laboratory located at Los Alamos, New Mexico, that comprises about 40 square miles (mi{sup 2}) (103.6 square kilometers [km{sup 2}]) of buildings, structures, and forested land (Figure 1). It is administered by NNSA for the Federal government and is managed and operated under contract by the University of California (UC). The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation Division (DX) to create a central core area of facilities, including offices, laboratories, and other support structures, at LANL's Two-Mile Mesa Complex, which comprises portions of Technical Area (TA) 6, TA-22, and TA-40. This Proposed Action would involve constructing new buildings; consolidating existing operations and offices; enhancing utilities, roads, and security infrastructure; and demolishing or removing older buildings, structures, and transportables at various technical areas used by DX (Figure 2). This EA has been prepared to assess the potential environmental consequences of this proposed construction, operational consolidation, and demolition project. The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for agency action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action, and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process provides NNSA with environmental information that can be used in developing mitigative actions, if necessary, to minimize or avoid adverse effects to the quality of the human environment and natural ecosystems should NNSA decide to proceed with implementing the Proposed Action at LANL. Ultimately, the goal of NEPA, and this EA, is to aid NNSA officials in making decisions based on an understanding of environmental consequences and in taking actions that protect, restore, and enhance the environment.

  6. Curriculum Vitae: Albie Felix Miles

    E-Print Network [OSTI]

    Silver, Whendee

    pest management; biological control; food systems and sustainability; introduction to environmental science; nature and properties of soils; soil ecology; integrated soil fertility management; researchCurriculum Vitae: Albie Felix Miles Ph.D. Candidate Environmental Science, Policy and Management

  7. Pennsylvania Nuclear Profile - Three Mile Island

    U.S. Energy Information Administration (EIA) Indexed Site

    Three Mile Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

  8. HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND

    E-Print Network [OSTI]

    Fabrikant, J.I.

    2010-01-01T23:59:59.000Z

    Commission on the Accident at Three Mile Island (Fabrikant,Commission on the Accident at Three Mile Island. (Fahrikant,Commission on the Accident at Three Mile Island. (Fabrikant,

  9. HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND

    E-Print Network [OSTI]

    Fabrikant, J.I.

    2010-01-01T23:59:59.000Z

    than 10 miles from the nuclear plant at any time during thewithin 10 miles of the nuclear plant is about 51 of thewithin 50 miles of the nuclear plant is less than 1% of the

  10. Mile High: Noncompliance Determination (2012-SE-4501)

    Broader source: Energy.gov [DOE]

    DOE issued a Notice of Noncompliance Determination to Mile High Equipment, LLC finding that Ice-O-Matic brand automatic commercial ice maker basic model ICE2106 FW, HW does not comport with the energy conservation standards.

  11. Finance Division EXTRA MILE AWARD PROGRAM

    E-Print Network [OSTI]

    Crews, Stephen

    Finance Division EXTRA MILE AWARD PROGRAM Nomination Form Instructions Any fulltime or parttime permanent or temporary SPA employee within the Finance Division who works 20 or more provided. The seven major departments within the Finance Division to choose from are described below

  12. Estimating Vehicle Miles Traveled on Local Roads

    E-Print Network [OSTI]

    Qian, Jiayu

    2013-11-07T23:59:59.000Z

    This research presents a new method to estimate the local road vehicle miles traveled (VMT) with the concept of betweenness centrality. Betweenness centrality is a measure of a node’s or link’s centrality on a network that has been applied popularly...

  13. Fact #860 February 16, 2015 Relationship of Vehicle Miles of...

    Energy Savers [EERE]

    Fact 860 February 16, 2015 Relationship of Vehicle Miles of Travel and the Price of Gasoline - Dataset Fact 860 February 16, 2015 Relationship of Vehicle Miles of Travel and the...

  14. Place Last Name First Name Gender Age Category Swim Lengths Swim Distance Bike Distance Run Distance Overall Distance 1 Happe Andy M 18-24 91.00 lengths 1.379 miles 16.200 miles 4.360 miles 21.939 miles

    E-Print Network [OSTI]

    Amin, S. Massoud

    Distance Overall Distance 1 Happe Andy M 18-24 91.00 lengths 1.379 miles 16.200 miles 4.360 miles 21.939 miles 2 Blazek Joseph M 18-24 72.00 lengths 1.091 miles 15.500 miles 3.760 miles 20.351 miles 3 Neuharth Jarrod M 18-24 48.00 lengths 0.727 miles 15.700 miles 3.150 miles 19.577 miles 4 Johnson Gabriel M 18

  15. Place Last Name First Name Gender Age Category Swim Lengths Swim Distance Bike Distance Run Distance Overall Distance 1 Guenter Jim M 40-49 92.00 lengths 1.394 miles 17.300 miles 4.360 miles 23.054 miles

    E-Print Network [OSTI]

    Amin, S. Massoud

    Distance Overall Distance 1 Guenter Jim M 40-49 92.00 lengths 1.394 miles 17.300 miles 4.360 miles 23 M 18-24 91.00 lengths 1.379 miles 16.200 miles 4.360 miles 21.939 miles 4 Gabrielsen Susanne F 25.00 lengths 0.894 miles 16.700 miles 3.770 miles 21.364 miles 6 Porter Paul M 50+ 53.00 lengths 0.803 miles 16

  16. EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

  17. Pennsylvania Nuclear Profile - Three Mile Island

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5 Tables July 1996 Energy Information Administration Office ofthroughYear Jan Feb Mar AprYear Jan Feb Mar Apr MayPeachThree Mile

  18. Miles Electric Vehicles | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville, Ohio:Menomonee| OpenMickeyDelaware:Midwest, Wyoming:MilamMiles

  19. Three Mile Canyon | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformationThe yearThermalSoulOaks,Mile Canyon Jump to:

  20. Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled

    Broader source: Energy.gov [DOE]

    For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy.

  1. New York Nuclear Profile - Nine Mile Point Nuclear Station

    U.S. Energy Information Administration (EIA) Indexed Site

    Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

  2. Laboratory measurement verification of laser hazard analysis for miles weapon simulators used in force on force exercises.

    SciTech Connect (OSTI)

    Augustoni, Arnold L.

    2006-08-01T23:59:59.000Z

    Due to the change in the batteries used with the Small Arm Laser Transmitters (SALT) from 3-volts dc to 3.6-volts dc and changes to SNL MILES operating conditions, the associated laser hazards of these units required re-evaluation to ensure that the hazard classification of the laser emitters had not changed as well. The output laser emissions of the SNL MILES, weapon simulators and empire guns, used in Force-On-Force (FOF) training exercises, was measured in accordance to the ANSI Standard Z136.4-2005, ''Recommended Practice for Laser Safety Measurements for Hazard Evaluation''. The laser hazard class was evaluated in accordance with the ANSI Standard Z136.1-2000, ''Safe Use of Lasers'', using ''worst'' case conditions associated with these MILES units. Laser safety assessment was conducted in accordance with the ANSI Standard Z136.6-2005, ''Safe Use of Lasers Outdoors''. The laser hazard evaluation of these MILES laser emitters was compared to and supersedes SAND Report SAND2002-0246, ''Laser Safety Evaluation of the MILES and Mini MILES Laser Emitting Components'', which used ''actual'' operating conditions of the laser emitters at the time of its issuance.

  3. NASA Green Flight Challenge: Conceptual Design Approaches and Technologies to Enable 200 Passenger Miles

    E-Print Network [OSTI]

    Waliser, Duane E.

    Miles per Gallon Douglas P. Wells* NASA Langley Research Center, Hampton, Virginia 23681 The Green 50 passenger-miles per gallon and this competition will push teams to greater than 200 passenger-miles per gallon. The aircraft must also fly at least 100 miles per hour for 200 miles. The total prize

  4. Fact #860 February 16, 2015 Relationship of Vehicle Miles of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact 860 February 16, 2015 Relationship of Vehicle Miles of Travel and the Price of Gasoline The prices of gasoline and diesel fuel affect the transportation sector in many...

  5. Odometer Versus Self-Reported Estimates of Vehicle Miles Traveled

    Reports and Publications (EIA)

    2000-01-01T23:59:59.000Z

    The findings described here compare odometer readings with self-reported estimates of Vehicle Miles Traveled (VMT) to investigate to what extent self-reported VMT is a reliable surrogate for odometer-based VMT.

  6. Full Useful Life (120,000 miles) Exhaust Emission Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full Useful Life (120,000 miles) Exhaust Emission Performance of a NOx Adsorber and Diesel Particle Filter Equipped Passenger Car and Medium-Duty Engine in Conjunction with...

  7. Wind, Klickitat, Hood and Fifteen Mile Habitat Site Visits

    E-Print Network [OSTI]

    Wind, Klickitat, Hood and Fifteen Mile Habitat Site Visits April 17-19th, 2013 ISRP Review Team (4 at the Sheraton Airport at 7:15 a.m. Site Visits: Depart airport and head east: Wind, Klickitat, White Salmon in this review: 1998-019-00 Wind River Watershed Underwood Conservation District (UCD), US Forest Service (USFS

  8. Wireless Network Interface Energy Conservation for Bottlenecked First Mile Networks

    E-Print Network [OSTI]

    Chandra, Surendar

    user using the limited upstream capacity of the home broad- band link. We analyze the behavior of two- posed by this behavior on a client side energy saving mechanism. We also describe techniques that allowWireless Network Interface Energy Conservation for Bottlenecked First Mile Networks Surendar

  9. Equity Evaluation of Vehicle Miles Traveled Fees in Texas 

    E-Print Network [OSTI]

    Larsen, Lisa Kay

    2012-10-19T23:59:59.000Z

    to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

  10. Equity Evaluation of Vehicle Miles Traveled Fees in Texas

    E-Print Network [OSTI]

    Larsen, Lisa Kay

    2012-10-19T23:59:59.000Z

    to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

  11. 100,000-Mile Evaluation of Transit Buses Operated on Biodiesel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    00,000-Mile Evaluation of Transit Buses Operated on Biodiesel Blends (B20) 100,000-Mile Evaluation of Transit Buses Operated on Biodiesel Blends (B20) Presentation given at DEER...

  12. Boise State University Automobile Use Mileage Log (Documentation for Business Miles)

    E-Print Network [OSTI]

    Barrash, Warren

    Boise State University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03 University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03/10 PAGE ____ (IF YOU NEED

  13. New York Nuclear Profile - Nine Mile Point Nuclear Station

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5 Tables July 1996 Energy Information Administration Office ofthrough 1996) inThousandWithdrawals (MillionNine Mile Point Nuclear

  14. Analysis of Three Mile Island-Unit 2 accident

    SciTech Connect (OSTI)

    Not Available

    1980-03-01T23:59:59.000Z

    The Nuclear Safety Analysis Center (NSAC) of the Electric Power Research Institute has analyzed the Three Mile Island-2 accident. Early results of this analysis were a brief narrative summary, issued in mid-May 1979 and an initial version of this report issued later in 1979 as noted in the Foreword. The present report is a revised version of the 1979 report, containing summaries, a highly detailed sequence of events, a comparison of that sequence of events with those from other sources, 25 appendices, references and a list of abbreviations and acronyms. A matrix of equipment and system actions is included as a folded insert.

  15. Seven Mile, Ohio: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd JumpInformationScottsOklahoma: EnergySeoulSettlers HillMile, Ohio:

  16. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  17. Vegetation survey of Pen Branch and Four Mile Creek wetlands

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

  18. Accident at Three Mile Island: the human dimensions

    SciTech Connect (OSTI)

    Sills, D.L.; Wolf, C.P.; Shelanski, V.B. (eds.)

    1982-01-01T23:59:59.000Z

    A separate abstract was prepared for each of the 19 chapters, divided according to the following Parts: (1) Public Perceptions of Nuclear Energy; (2) Local Responses to Nuclear Plants; (3) Institutional Responsibilities for Nuclear Energy; (4) The Interaction of Social and Technical Systems; and (5) Implications for Public Policy. All of the abstracts will appear in Energy Abstracts for Policy Analysis (EAPA); three will appear in Energy Research Abstracts (ERA). At the request of the President's Commission on the Accident at Three Mile Island (the Kemeny Commission), the Social Science Research Council commissioned social scientists to write a series of papers on the human dimensions of the event. This volume includes those papers, in revised and expanded form, and a comprehensive bibliography of published and unpublished social science research on the accident and its aftermath.

  19. Notices 20 Miles Northwest of Rapid City SD Rapid City SD 57702

    Broader source: Energy.gov (indexed) [DOE]

    Notices 20 Miles Northwest of Rapid City SD Rapid City SD 57702 Landholding Agency: Agriculture Property Number: 15201410016 Status: Excess Comments: off-site removal only; 55 sq....

  20. 51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

    Broader source: Energy.gov [DOE]

    51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

  1. Heatup of the TMI-2 (Three Mile Island Unit 2) lower head during core relocation

    SciTech Connect (OSTI)

    Wang, S.K.; Sienicki, J.J.; Spencer, B.W. (Argonne National Laboratory, IL (USA))

    1989-11-01T23:59:59.000Z

    According to current perceptions of the Three Mile Island Unit 2 (TMI-2) accident, corium largely relocated into the reactor vessel lower head at {approximately}224 min into the accident. Defueling examinations have revealed that the corium relocated from the molten core region to the lower head predominantly by way of drainage through the core former region (CFR) located between the vertical baffle plates immediately surrounding the fuel assemblies and the core barrel. An analysis has been carried out to assess the heatup of the reactor vessel lower head during the core relocation event, particularly the potential for a melting attack on the lower head wall and the in-core instrument nozzle penetration weldments. The analysis employed the THIRMAL computer code developed at Argonne National Laboratory (ANL) to predict the breakup and quenching or corium jets under film boiling conditions as well as the size distributions and quenching of the resultant molten droplets. The transient heatup and ablation of the vessel wall and penetration weldments due to impinging corium jets was calculated using the MISTI computer code.

  2. Historical summary of the Three Mile Island Unit 2 core debris transportation campaign

    SciTech Connect (OSTI)

    Schmitt, R.C.; Tyacke, M.J. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Quinn, G.J. [Wastren, Inc., Germantown, MD (United States)

    1993-03-01T23:59:59.000Z

    Transport of the damaged core materials from the Unit 2 reactor of the Three Mile Island Nuclear Power Station (TMI-2) to the Idaho National Engineering Laboratory (INEL) for examination and storage presented many technical and institutional challenges, including assessing the ability to transport the damaged core; removing and packaging core debris in ways suitable for transport; developing a transport package that could both meet Federal regulations and interface with the facilities at TMI-2 and the INEL; and developing a transport plan, support logistics, and public communications channels suited to the task. This report is a historical summary of how the US Department of Energy addressed those challenges and transported, received, and stored the TMI-2 core debris at the INEL. Subjects discussed include preparations for transport, loading at TMI-2, institutional issues, transport operations, receipt and storage at the INEL, governmental inquiries/investigations, and lessons learned. Because of public attention focused on the TMI-2 Core Debris Transport Program, the exchange of information between the program and public was extensive. This exchange is a focus for parts of this report to explain why various operations were conducted as they were and why certain technical approaches were employed. And, because of that exchange, the program may have contributed to a better public understanding of such actions and may contribute to planning and execution of similar future actions.

  3. Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)

    Broader source: Energy.gov [DOE]

    Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

  4. Autonomous personal vehicle for the first- and last-mile transportation services

    E-Print Network [OSTI]

    Chong, Z. J.

    This paper describes an autonomous vehicle testbed that aims at providing the first- and last- mile transportation services. The vehicle mainly operates in a crowded urban environment whose features can be extracted a ...

  5. EXPANSIVE SUBDYNAMICS FOR ALGEBRAIC Z d ACTIONS MANFRED EINSIEDLER, DOUGLAS LIND, RICHARD MILES, AND THOMAS WARD

    E-Print Network [OSTI]

    Lind, Douglas A.

    EXPANSIVE SUBDYNAMICS FOR ALGEBRAIC Z d ­ACTIONS MANFRED EINSIEDLER, DOUGLAS LIND, RICHARD MILES spaces was proposed by Boyle and Lind in terms of expansive behavior along lower­dimensional subspaces

  6. EXPANSIVE SUBDYNAMICS FOR ALGEBRAIC Zd-ACTIONS MANFRED EINSIEDLER, DOUGLAS LIND, RICHARD MILES, AND THOMAS WARD

    E-Print Network [OSTI]

    Lind, Douglas A.

    EXPANSIVE SUBDYNAMICS FOR ALGEBRAIC Zd-ACTIONS MANFRED EINSIEDLER, DOUGLAS LIND, RICHARD MILES spaces was proposed by Boyle and Lind in terms of expansive behavior along lower-dimensional subspaces

  7. Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)

    Broader source: Energy.gov [DOE]

    Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

  8. Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint

    SciTech Connect (OSTI)

    Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

    2011-01-01T23:59:59.000Z

    Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

  9. Facebook, Twitter and Google Plus for Breaking News: Is there a winner? Miles Osborne

    E-Print Network [OSTI]

    Osborne, Miles

    Facebook, Twitter and Google Plus for Breaking News: Is there a winner? Miles Osborne School Media have be- gun to carry news. Here we examine how Facebook, Google Plus and Twitter report Facebook or Google Plus. Face- book and Google Plus largely repost newswire stories and their main research

  10. Parallelising the dual revised simplex method Julian Hall1 Qi Huangfu2 Miles Lubin3

    E-Print Network [OSTI]

    Hall, Julian

    Parallelising the dual revised simplex method Julian Hall1 Qi Huangfu2 Miles Lubin3 1School Parallelising the dual revised simplex method: Overview Background Three approaches Multiple iteration Conclusions Julian Hall Parallelising the dual revised simplex method 2 / 42 Linear programming (LP) minimize

  11. TTrraavveell GGuuiiddee 1. Student Affairs REQUIRES overnight lodging when driving an Avis vehicle over 500 miles.

    E-Print Network [OSTI]

    Ronquist, Fredrik

    TTrraavveell GGuuiiddee 1. Student Affairs REQUIRES overnight lodging when driving an Avis vehicle over 500 miles. 2. Avis car rental (state contract) The vehicle is automatically covered under.) This will negate the contract and insurance coverage. You must use a compact car unless a different vehicle

  12. The Laboratory SLAC National Accelerator Laboratory is home to a two-mile

    E-Print Network [OSTI]

    Wechsler, Risa H.

    -program laboratory for photon science, astrophysics, and accelerator and particle physics research. Six scientists promises to be just as extraordinary. #12;Accelerator Physics Particle accelerators are the working engines#12;The Laboratory SLAC National Accelerator Laboratory is home to a two-mile linear accelerator

  13. Crisis contained, The Department of Energy at Three Mile Island: a history

    SciTech Connect (OSTI)

    Cantelon, P L; Williams, R C

    1980-12-01T23:59:59.000Z

    An account is given of the response of US DOE to the Three Mile Island-2 accident on March 28, 1979. The accident is treated as though it was a military battle. A synoptic chronologgy of the accident events and of DOE and other responses is included. (DLC)

  14. Lower head creep rupture failure analysis associated with alternative accident sequences of the Three Mile Island Unit 2

    SciTech Connect (OSTI)

    Sang Lung, Chan [Swiss Federal Institute of Technology Zurich and Swiss Federal Nuclear Safety Inspectorate, Zurich, Switzerland, 8001 (Switzerland)

    2004-07-01T23:59:59.000Z

    The objective of this lower head creep rupture analysis is to assess the current version of MELCOR 1.8.5-RG against SCDAP/RELAP5 MOD 3.3kz. The purpose of this assessment is to investigate the current MELCOR in-vessel core damage progression phenomena including the model for the formation of a molten pool. The model for stratified molten pool natural heat transfer will be included in the next MELCOR release. Presently, MELCOR excludes the gap heat-transfer model for the cooling associated with the narrow gap between the debris and the lower head vessel wall. All these phenomenological models are already treated in SCDAP/RELAP5 using the COUPLE code to model the heat transfer of the relocated debris with the lower head based on a two-dimensional finite-element-method. The assessment should determine if current MELCOR capabilities adequately cover core degradation phenomena appropriate for the consolidated MELCOR code. Inclusion of these features should bring MELCOR much closer to a state of parity with SCDAP/RELAP5 and is a currently underway element in the MELCOR code consolidation effort. This assessment deals with the following analysis of the Three Mile Island Unit 2 (TMI-2) alternative accident sequences. The TMI-2 alternative accident sequence-1 includes the continuation of the base case of the TMI-2 accident with the Reactor Coolant Pumps (RCP) tripped, and the High Pressure Injection System (HPIS) throttled after approximately 6000 s accident time, while in the TMI-2 alternative accident sequence-2, the reactor coolant pumps is tripped after 6000 s and the HPIS is activated after 12,012 s. The lower head temperature distributions calculated with SCDAP/RELAP5 are visualized and animated with open source visualization freeware 'OpenDX'. (author)

  15. Robin Miles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements RecentlyElectronicResources Resources About1KennamerRobertV. O'NeillRobin

  16. The determination of settling velocities for sewage sludge disposed at 106-Mile Site

    E-Print Network [OSTI]

    Hernandez, Daniel Saul

    1991-01-01T23:59:59.000Z

    THE DBTERMZNATZON OF SETTLING VELOCZTZES FOR SEWAGE SLUDGE DZSPOSED AT 106-MILE SITE A Thesis by DANIEL SAUL HERNANDEZ Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of requirements for the degree... of MASTER OF SCIENCE December 1991 Major Subject: Civil Engineering THB DETERMZNATZON OF SBTTLZNG VELOCZTZES FOR SEWAGE SLUDGE DZSPOSBD AT 106-MZLE SZTB A Thesis by DANIEL SAUL HERNANDEZ Approved as to style and content by: James S. Bonner '(Chair...

  17. Depositional environment and reservoir morphology of the Frio sandstones, Nine Mile Point Field, Aransas County, Texas

    E-Print Network [OSTI]

    Powell, Raina Rae

    1976-01-01T23:59:59.000Z

    of MASTER OF SCIENCE August 1976 Ma) or Suh) ect: Geology DEPOSZTZONAL ENVIRCNMENT AND RESERVOIR MORPHOLOCY OF THE FRIO SANDSTONES ~ NINE MILE POI?f FIELD y ARANSAS CXIPIY ~ TEXAS Approved as to style and content by: (Chairman of ttee) ead... of Department (M August 1976 Depositional Environment and Reservoir Norphology of the Frio Sandstones, N1ne Nile Point Field, Aransas County~ Texas (August 1975) ~ Rains Rae Powell~ B, S? ~ Stephen F Austin State University Ch~ of Advisory Caamitteee Dr...

  18. Compilation of Earthquakes from 1850-2007 within 200 miles of the Idaho National Laboratory

    SciTech Connect (OSTI)

    N. Seth Carpenter

    2010-07-01T23:59:59.000Z

    An updated earthquake compilation was created for the years 1850 through 2007 within 200 miles of the Idaho National Laboratory. To generate this compilation, earthquake catalogs were collected from several contributing sources and searched for redundant events using the search criteria established for this effort. For all sets of duplicate events, a preferred event was selected, largely based on epicenter-network proximity. All unique magnitude information for each event was added to the preferred event records and these records were used to create the compilation referred to as “INL1850-2007”.

  19. Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery

    SciTech Connect (OSTI)

    Layne Pincock; Wendell Hintze; Dr. Koji Shirai

    2012-07-01T23:59:59.000Z

    Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japan’s Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

  20. Results of the radiological survey at Two Mile Creek, Tonawanda, New York (TNY002)

    SciTech Connect (OSTI)

    Murray, M.E.; Rodriguez, R.E.; Uziel, M.S.

    1997-08-01T23:59:59.000Z

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at Two Mile Creek, Tonawanda, New York. The survey was performed in November 1991 and May 1996. The purpose of the survey was to determine if radioactive materials from work performed under government contract at the Linde Air Products Division of Union Carbide Corporation, Tonawanda, New York, had been transported into the creek. The survey included a surface gamma scan in accessible areas near the creek and the collection of soil, sediment, and core samples for radionuclide analyses. Survey results indicate that no significant material originating at the Linde plant is presently in the creek. Three of the 1991 soil sample locations on the creek bank and one near the lake contained slightly elevated concentrations of {sup 238}U with radionuclide distributions similar to that found in materials resulting from former processing activities at the Linde site.

  1. Fact #854 January 5, 2015 Driving Ranges for All-Electric Vehicles in Model Year 2014 Vary from 62 to 265 Miles – Dataset

    Broader source: Energy.gov [DOE]

    Excel file with dataset for Driving Ranges for All-Electric Vehicles in Model Year 2014 Vary from 62 to 265 Miles

  2. Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon- Dataset

    Broader source: Energy.gov [DOE]

    Excel file with dataset for Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon

  3. 0 20 40 60 80 100 Miles 0 20 40 60 80 100 120 140 160 Kilometers

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    20 40 60 80 100 Miles 0 20 40 60 80 100 120 140 160 Kilometers UC Davis Water Management Research Group Aplication Efficiency: Dry Beans 2001 Developed as a cooperative project between University of California, Davis United States Geological Survey and California Department of Water Resources Map prepared

  4. EA-1985: Virginia Offshore Wind Technology Advancement Project (VOWTAP), 24 nautical miles offshore of Virginia Beach, Virginia

    Broader source: Energy.gov [DOE]

    DOE is proposing to fund Virginia Electric and Power Company's Virginia Offshore Wind Technology Advancement Project (VOWTAP). The proposed VOWTAP project consists of design, construction and operation of a 12 megawatt offshore wind facility located approximately 24 nautical miles off the coast of Virginia Beach, VA on the Outer Continental Shelf.

  5. South Dakota DOT 1) Rural PCCP -0.0 Band California Profilograph and incentive for less than 25" per mile max incentive

    E-Print Network [OSTI]

    California Profilograph - Bonus paid for less than 5" per mile. Max bonus is 103.5% for 2.9" PI or less and lift) - Bonus paid for 50 IRI or less, Max Bonus is $180 per 0.1 mile per lane for 35 or less IRI. 2

  6. Evaluation of the Three Mile Island Unit 2 reactor building decontamination process

    SciTech Connect (OSTI)

    Dougherty, D.; Adams, J. W.

    1983-08-01T23:59:59.000Z

    Decontamination activities from the cleanup of the Three Mile Island Unit 2 Reactor Building are generating a variety of waste streams. Solid wastes being disposed of in commercial shallow land burial include trash and rubbish, ion-exchange resins (Epicor-II) and strippable coatings. The radwaste streams arising from cleanup activities currently under way are characterized and classified under the waste classification scheme of 10 CFR Part 61. It appears that much of the Epicor-II ion-exchange resin being disposed of in commerical land burial will be Class B and require stabilization if current radionuclide loading practices continue to be followed. Some of the trash and rubbish from the cleanup of the reactor building so far would be Class B. Strippable coatings being used at TMI-2 were tested for leachability of radionuclides and chelating agents, thermal stability, radiation stability, stability under immersion and biodegradability. Actual coating samples from reactor building decontamination testing were evaluated for radionuclide leaching and biodegradation.

  7. Characterization of solids in the Three Mile Island Unit 2 reactor defueling water

    SciTech Connect (OSTI)

    Campbell, D. O.

    1987-12-01T23:59:59.000Z

    Because of the impact of poor water clarity on defueling operations at the Three Mile Island Unit 2 Nuclear Power Station, a study was undertaken to characterize suspended particulates in the reactor defueling water. The examination included cascade filtration through Nuclepore filters of progressively smaller pore sizes, using three water samples obtained at different times and after varying degrees of clarification. The solids collected on the filters were examined with a scanning electron microscope and analyzed with energy-dispersive x-ray fluorescence. A wide variety of solids was observed, and 26 elements were detected. These included all the materials expected from the reactor system (uranium, zirconium, silver, cadmium, indium, iron, chromium, and nickel), chemicals and zeolites used to decontaminate the water (aluminum, silicon, sodium), common impurities (potassium, chlorine, sulfur, magnesium, calcium, and others), as well as some unexpected metals (molybdenum, manganese, bromine, and lead). There was also evidence for the presence of organic material. A diverse assortment of particles with widely varying surface properties was found to be present.

  8. Evaluation of special safety issues associated with handling the Three Mile Island Unit 2 core debris

    SciTech Connect (OSTI)

    Henrie, J.O.; Appel, J.N.

    1985-06-01T23:59:59.000Z

    This document reports the results of recent tests and analyses evaluating safety concerns relating to Three Mile Island Unit 2 (TMI-2) core debris pyrophoricity, radiolytic hydrogen and oxygen, and the potential for steam generation in shipping canisters during a fire. Recommendations drawn from these results include the following: (1) hydrogen-oxygen recombiners should be installed in each core debris canister, (2) water should be removed from each canister by drip drying (no vacuum pumping is required), (3) the maximum weight of the loaded, dewatered canisters and the minimum volume of gas/vapor in each canister should be controlled and measured by weighting before and after dewatering, (4) a cover gas of approximately two atmospheres of argon should be added to each canister, (5) each canister should be weighed and pressure checked prior to shipping, (6) the shipping cask should be designed to limit the temperature of the canister contents after the standard hypothetical accident (fire) such that the design pressure of the canister/cask will not be exceeded, (7) provisions should be made for canister venting during long-term storage and for cask venting in the event of an overpressure condition resulting from an ''extended'' fire, and (8) some pyrophoricity testing of samples taken during defueling should be conducted to assure adequate safety-related information during canister opening.

  9. A critical essay: Ten mile emergency planning zones, pro or con

    SciTech Connect (OSTI)

    MacDurmon, G.W.

    1987-12-01T23:59:59.000Z

    The NRC's current emergency planning regulations are based on source term data which has come into question. Indeed, many current models indicate that source terms can be calculated which are one or more orders of magnitude lower than those from WASH-1400. However, there remains a number of unresolved technical issues between the NRC and the Industry Downgraded Core Research Program (IDCOR) calculated source terms which presents a very large uncertainty for the determined values. In addition, there remains questions concerning the integrity of containment, and the emphasis which should be placed on operator intervention. These results have caused both the NRC and the APS to state that source terms cannot be lowered for all radionuclides and all nuclear power plants at this time. Data from NUREG-1150, along with the statements of other experts, do seem to demonstrate that evacuation, as a means of dose minimization, has been overemphasized under the current regulations. While an appropriate evacuation planning distance, specific to each plant, would vary according to a number of factors such as population density, available transportation, typical housing structures for shelter, type of plant containment, etc., current methods of emergency planning must also address these issues. In light of this and the dose estimates across the Emergency Planning Zone (EPZ), it would seem that detailed emergency plans out to ten miles which place an emphasis on evacuation are unnecessary from a health physics perspective, and bear heavy socioeconomic costs. 14 refs., 13 figs., 5 tabs.

  10. Peer review of the Three Mile Island Unit 2 Vessel Investigation Project metallurgical examinations

    SciTech Connect (OSTI)

    Bohl, R.W.; Gaydos, R.G.; Vander Voort, G.F.; Diercks, D.R. [Argonne National Lab., IL (United States)

    1994-07-01T23:59:59.000Z

    Fifteen samples recovered from the lower head of the Three Mile Island (TMI) Unit 2 nuclear reactor pressure vessel were subjected to detailed metallurgical examinations by the Idaho National Engineering Laboratory (INEL), with supporting work carried out by Argonne National Laboratory (ANL) and several of the European participants. These examinations determined that a portion of the lower head, a so-called elliptical ``hot spot`` measuring {approx}0.8 {times} 1 m, reached temperatures as high as 1100{degrees}C during the accident and cooled from these temperatures at {approx}10--100{degrees}C/min. The remainder of the lower head was found to have remained below the ferrite-toaustenite transformation temperature of 727{degrees}C during the accident. Because of the significance of these results and their importance to the overall analysis of the TMI accident, a panel of three outside peer reviewers, Dr. Robert W. Bohl, Mr. Richard G. Gaydos, and Mr. George F. Vander Voort, was formed to conduct an independent review of the metallurgical analyses. After a thorough review of the previous analyses and examination of photo-micrographs and actual lower head specimens, the panel determined that the conclusions resulting from the INEL study were fundamentally correct. In particular, the panel reaffirmed that four lower head samples attained temperatures as high as 1100{degrees}C, and perhaps as high as 1150--1200{degrees}C in one case, during the accident. They concluded that these samples subsequently cooled at a rate of {approx}50--125{degrees}C/min in the temperature range of 600--400{degrees}C, in good agreement with the original analysis. The reviewers also agreed that the remainder of the lower head samples had not exceeded the ferrite-to-austenite transformation temperature during the accident and suggested several refinements and alternative procedures that could have been employed in the original analysis.

  11. Methodology for Estimating ton-Miles of Goods Movements for U.S. Freight Mulitimodal Network System

    SciTech Connect (OSTI)

    Oliveira Neto, Francisco Moraes [ORNL] [ORNL; Chin, Shih-Miao [ORNL] [ORNL; Hwang, Ho-Ling [ORNL] [ORNL

    2013-01-01T23:59:59.000Z

    Ton-miles is a commonly used measure of freight transportation output. Estimation of ton-miles in the U.S. transportation system requires freight flow data at disaggregated level (either by link flow, path flows or origin-destination flows between small geographic areas). However, the sheer magnitude of the freight data system as well as industrial confidentiality concerns in Census survey, limit the freight data which is made available to the public. Through the years, the Center for Transportation Analysis (CTA) of the Oak Ridge National Laboratory (ORNL) has been working in the development of comprehensive national and regional freight databases and network flow models. One of the main products of this effort is the Freight Analysis Framework (FAF), a public database released by the ORNL. FAF provides to the general public a multidimensional matrix of freight flows (weight and dollar value) on the U.S. transportation system between states, major metropolitan areas, and remainder of states. Recently, the CTA research team has developed a methodology to estimate ton-miles by mode of transportation between the 2007 FAF regions. This paper describes the data disaggregation methodology. The method relies on the estimation of disaggregation factors that are related to measures of production, attractiveness and average shipments distances by mode service. Production and attractiveness of counties are captured by the total employment payroll. Likely mileages for shipments between counties are calculated by using a geographic database, i.e. the CTA multimodal network system. Results of validation experiments demonstrate the validity of the method. Moreover, 2007 FAF ton-miles estimates are consistent with the major freight data programs for rail and water movements.

  12. A review of "Indian Ink: Script and Print in the Making of the English East India Company" by Miles Ogborn

    E-Print Network [OSTI]

    Nechtman, Tillman W.

    2008-01-01T23:59:59.000Z

    , Indian Ink: Script and Print in the Making of the English East India Company. Chicago and London: The University of Chicago Press, 2007. xiii + 318 pp. + 22 illus. $40.00. Review by TILLMAN W. NECHTMAN, SKIDMORE COLLEGE. The India Office Records... Company (EIC) and the English/British empire in South Asia. Miles Ogborn?s impressive new book, Indian Ink: Script and Print in the Making of the English East India Company, approaches this same archive from an important new direction. Rather than reading...

  13. Review of Destructive Assay Methods for Nuclear Materials Characterization from the Three Mile Island (TMI) Fuel Debris

    SciTech Connect (OSTI)

    Carla J. Miller

    2013-09-01T23:59:59.000Z

    This report provides a summary of the literature review that was performed and based on previous work performed at the Idaho National Laboratory studying the Three Mile Island 2 (TMI-2) nuclear reactor accident, specifically the melted fuel debris. The purpose of the literature review was to document prior published work that supports the feasibility of the analytical techniques that were developed to provide quantitative results of the make-up of the fuel and reactor component debris located inside and outside the containment. The quantitative analysis provides a technique to perform nuclear fuel accountancy measurements

  14. An Econometric Analysis of the Elasticity of Vehicle Travel with Respect to Fuel Cost per Mile Using RTEC Survey Data

    SciTech Connect (OSTI)

    Greene, D.L.; Kahn, J.; Gibson, R.

    1999-03-01T23:59:59.000Z

    This paper presents the results of econometric estimation of the ''rebound effect'' for household vehicle travel in the United States based on a comprehensive analysis of survey data collected by the U.S. Energy Information Administration (EIA) at approximately three-year intervals over a 15-year period. The rebound effect is defined as the percent change in vehicle travel for a percent change in fuel economy. It summarizes the tendency to ''take back'' potential energy savings due to fuel economy improvements in the form of increased vehicle travel. Separate vehicles use models were estimated for one-, two-, three-, four-, and five-vehicle households. The results are consistent with the consensus of recently published estimates based on national or state-level data, which show a long-run rebound effect of about +0.2 (a ten percent increase in fuel economy, all else equal, would produce roughly a two percent increase in vehicle travel and an eight percent reduction in fuel use). The hypothesis that vehicle travel responds equally to changes in fuel cost-per-mile whether caused by changes in fuel economy or fuel price per gallon could not be rejected. Recognizing the interdependency in survey data among miles of travel, fuel economy and price paid for fuel for a particular vehicle turns out to be crucial to obtaining meaningful results.

  15. Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-10-01T23:59:59.000Z

    On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

  16. Directions to Virginia Tech Chemistry Department from Interstate 81 Follow I-81 to Exit 118-B. Follow US 460 West about 6 miles. Upon entering Blacksburg, do NOT

    E-Print Network [OSTI]

    Crawford, T. Daniel

    Directions to Virginia Tech Chemistry Department from Interstate 81 Follow I-81 to Exit 118-B. Follow US 460 West about 6 miles. Upon entering Blacksburg, do NOT use "Business" US 460 which is also called Main Street. Bear left and stay on the freeway. The first traffic light on US 460 will be Virginia

  17. WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write

    E-Print Network [OSTI]

    Koban, Nic

    WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write your monthly gasoline cost C in terms of the distance D that you travel each month

  18. UMore Park Update October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast

    E-Print Network [OSTI]

    Amin, S. Massoud

    UMore Park Update ­ October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast of the Twin Cities at the suburban presentation set for October 11 The UMore Development LLC will provide an update on UMore Park activities

  19. Vehicle engine use when no longer in transit; exceptions -Vehicle idling gets zero miles per gallon; unnecessary idling wastes fuel and pollutes.

    E-Print Network [OSTI]

    Powers, Robert

    Vehicle engine use when no longer in transit; exceptions - Vehicle idling gets zero miles per, no University vehicle or piece of equipment is to be idled in a non-emergency situation. The operator of the vehicle/equipment is to turn-off the unit and the keys are to be removed from the ignition. EXEMPTIONS

  20. HILDERBRAND, DOUGLAS CLARENCE. Risk assessment of North Carolina tropical cyclones (1925-2000). (Under the direction of Dr. Lian Xie)

    E-Print Network [OSTI]

    Liu, Paul

    conditions with 3.67 cubic miles of water. The next-highest value from previous tropical cyclones management decisions. #12;RISK ASSESSMENT OF NORTH CAROLINA TROPICAL CYCLONES (1925-2000) by DOUGLAS C. In 1995, he earned his Bachelor of Arts degree in geology and was accepted to

  1. NANA Geothermal Assessment Program Final Report

    SciTech Connect (OSTI)

    Jay Hermanson

    2010-06-22T23:59:59.000Z

    In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

  2. miles-99.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4 Self-Scrubbing:,, , (Energy97 Upper TroposphericIVertical Velocity

  3. Modal shifts in short-haul passenger travel and the consequent energy impacts. [Intercity travel under 500 miles

    SciTech Connect (OSTI)

    Not Available

    1980-03-01T23:59:59.000Z

    A study was performed to evaluate the impacts of strategies to effect modal shifts in short-haul passenger travel (defined herein as intercity travel under 500 miles) from energy-intensive modes to those modes that are less energy-intensive. A series of individual strategies, ranging from incentives to the less energy-intensive modes (bus, rail) to penalties to the more energy-intensive modes (auto, air) was examined to determine energy saved and policy implications relative to strategy implementation. The most effective of the individual strategies were then combined in all permutations, and the analysis was repeated. As part of the analytical process, effects of factors other than energy (user cost and time, emissions, government subsidy, and travel fatailities) were examined in a benefit/cost analysis. Finally, energy savings, benefit/cost impacts, implementation considerations, and policy implications were evaluated to arrive at conclusions as to the effectiveness of the more-influential strategies and to the overall effectiveness of induced modal shifts. The principal conclusion of the study is that the maximum 1980 energy saving that might be realized by modal shifts, discounting the concurrent effects of demand suppression and improvement of mode efficiency, is approximately 83 x 10/sup 12/ Btu (46,500 bbl gasoline per day), 3.8% of the total projected 1980 energy consumption in the short-haul transportation sector and 0.23% of the total US petroleum use. It was also concluded that strategies to achieve these small savings by modal shifts would result in significant economic, social, and business disruptions.

  4. Revisiting Insights from Three Mile Island Unit 2 Postaccident Examinations and Evaluations in View of the Fukushima Daiichi Accident

    SciTech Connect (OSTI)

    Joy Rempe; Mitchell Farmer; Michael Corradini; Larry Ott; Randall Gauntt; Dana Powers

    2012-11-01T23:59:59.000Z

    The Three Mile Island Unit 2 (TMI-2) accident, which occurred on March 28, 1979, led industry and regulators to enhance strategies to protect against severe accidents in commercial nuclear power plants. Investigations in the years after the accident concluded that at least 45% of the core had melted and that nearly 19 tonnes of the core material had relocated to the lower head. Postaccident examinations indicate that about half of that material formed a solid layer near the lower head and above it was a layer of fragmented rubble. As discussed in this paper, numerous insights related to pressurized water reactor accident progression were gained from postaccident evaluations of debris, reactor pressure vessel (RPV) specimens, and nozzles taken from the RPV. In addition, information gleaned from TMI-2 specimen evaluations and available data from plant instrumentation were used to improve severe accident simulation models that form the technical basis for reactor safety evaluations. Finally, the TMI-2 accident led the nuclear community to dedicate considerable effort toward understanding severe accident phenomenology as well as the potential for containment failure. Because available data suggest that significant amounts of fuel heated to temperatures near melting, the events at Fukushima Daiichi Units 1, 2, and 3 offer an unexpected opportunity to gain similar understanding about boiling water reactor accident progression. To increase the international benefit from such an endeavor, we recommend that an international effort be initiated to (a) prioritize data needs; (b) identify techniques, samples, and sample evaluations needed to address each information need; and (c) help finance acquisition of the required data and conduct of the analyses.

  5. EA-1447: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico

  6. Rental rate includes liability insurance (LDW), vehicle licensing fees, unlimited roundtrip mileage; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in the

    E-Print Network [OSTI]

    Arnold, Jonathan

    ; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in setting up direct billing for your department, please click link below: http://www

  7. Funding for the food miles project was provided through Agriculture and Agri-Food Canada's Advancing Canadian Agriculture and Agri-Food (ACAAF) Program. In Nova Scotia the program is delivered by Agri-Futures Nova Scotia.

    E-Print Network [OSTI]

    Peak, Derek

    Funding for the food miles project was provided through Agriculture and Agri-Food Canada.................................................................... 7 Energy .................................................................................. 9 Self grown? With these two questions at the fore, combing through various statistics and reports

  8. Final environmental impact statement for the construction and operation of an independent spent fuel storage installation to store the Three Mile Island Unit 2 spent fuel at the Idaho National Engineering and Environmental Laboratory. Docket Number 72-20

    SciTech Connect (OSTI)

    NONE

    1998-03-01T23:59:59.000Z

    This Final Environmental Impact Statement (FEIS) contains an assessment of the potential environmental impacts of the construction and operation of an Independent Spent Fuel Storage Installation (ISFSI) for the Three Mile Island Unit 2 (TMI-2) fuel debris at the Idaho National Engineering and Environmental laboratory (INEEL). US Department of Energy-Idaho Operations Office (DOE-ID) is proposing to design, construct, and operate at the Idaho Chemical Processing Plant (ICPP). The TMI-2 fuel debris would be removed from wet storage, transported to the ISFSI, and placed in storage modules on a concrete basemat. As part of its overall spent nuclear fuel (SNF) management program, the US DOE has prepared a final programmatic environmental impact statement (EIS) that provides an overview of the spent fuel management proposed for INEEL, including the construction and operation of the TMI-2 ISFSI. In addition, DOE-ID has prepared an environmental assessment (EA) to describe the environmental impacts associated with the stabilization of the storage pool and the construction/operation of the ISFSI at the ICPP. As provided in NRC`s NEPA procedures, a FEIS of another Federal agency may be adopted in whole or in part in accordance with the procedures outlined in 40 CFR 1506.3 of the regulations of the Council on Environmental Quality (CEQ). Under 40 CFR 1506.3(b), if the actions covered by the original EIS and the proposed action are substantially the same, the agency adopting another agency`s statement is not required to recirculate it except as a final statement. The NRC has determined that its proposed action is substantially the same as actions considered in DOE`s environmental documents referenced above and, therefore, has elected to adopt the DOE documents as the NRC FEIS.

  9. Preliminary Feasibility Assessment of Geologic Carbon Sequestration Potential for TVA's John Sevier and Kingston Power Plants

    SciTech Connect (OSTI)

    Smith, Ellen D [ORNL; Saulsbury, Bo [ORNL

    2008-03-01T23:59:59.000Z

    This is a preliminary assessment of the potential for geologic carbon sequestration for the Tennessee Valley Authority's (TVA) John Sevier and Kingston power plants. The purpose of this assessment is to make a 'first cut' determination of whether there is sufficient potential for geologic carbon sequestration within 200 miles of the plants for TVA and Oak Ridge National Laboratory (ORNL) to proceed with a joint proposal for a larger project with a strong carbon management element. This assessment does not consider alternative technologies for carbon capture, but assumes the existence of a segregated CO{sub 2} stream suitable for sequestration.

  10. Environmental life-cycle assessment of highway construction projects

    E-Print Network [OSTI]

    Rajagopalan, Neethi

    2009-05-15T23:59:59.000Z

    An LCI report for environmental releases should be considered as some form of impact assessment. The listing of releases implies that the emissions have a detrimental effect on the environment but no attempt has been made to analyze the nature... inventory of the environmental emissions to air from the construction of 3.2 miles (four lanes of highway) of a road in Texas. A process-based approach, which is basically a material and energy balance approach, was used and compared with the economic...

  11. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01T23:59:59.000Z

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  12. Fort Stewart integrated resource assessment. Volume 3: Resource assessment

    SciTech Connect (OSTI)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  13. Economic Assessment of a Conceptual Biomass to Liquids Bio-Syntrolysis Plant

    SciTech Connect (OSTI)

    M. M. Plum; G. L. Hawkes

    2010-06-01T23:59:59.000Z

    A series of assessments evaluated the economic efficiency of integrating a nuclear electric power plant with a biomass to SynFuel plant under three market scenarios. Results strongly suggest that a nuclear assisted-BioSyntrolysis Process would be as cost competitive as other carbon feedstock to liquid fuels concepts while having significant advantages regarding CO2 greenhouse gas production. This concept may also be competitive for those energy markets where energy dense, fossil fuels are scarce while wind, hydroelectric, or other renewable energy sources can be produced at a relatively low cost. At this time, a realistic vision of this technology’s deployment of a biomass to synfuel plants powered by a nuclear 1100 MWe reactor. Accompanying an area of 25 miles by 25 miles, this integrated Enterprise could produce 24,000 BBLs of SynFuel daily; or 0.2% of the U.S.’s imported oil.

  14. RELAP5/MOD2 Overview and Developmental. Assessment Results from TMl-1 Plant Transient Analysis

    SciTech Connect (OSTI)

    Lin, J. C.; Tsai, C. C.; Ransom, V. H.; Johnsen, G. W. [EGiG Idaho, Inc. Idaho National Engineering Laboratory, P.O. Box 1625, Idaho Falls, ID 83415 (United States)

    2013-02-01T23:59:59.000Z

    RELAP5/MOD2 is a new version of the RELAP5 thermal-hydraulic computer code containing improved modeling features that provide a generic capability for pressurized water reactor transient simulation. The objective of this paper is to provide code users with an overview of the code and to report developmental assessment results obtained from a Three Mile Island Unit One plant transient analysis. The assessment shows that the injection of highly sub-cooled water into a high-pressure primary coolant system does not cause unphysical results or pose a problem for RELAP5/MOD2. (author)

  15. Assessment Documents

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015

    The Office of Nuclear Safety and Environmental...

  16. Rutgers University Environmental Assessment

    E-Print Network [OSTI]

    Delgado, Mauricio

    for electricity, green energy, fuel use, chemical use, water use, and sustainable materials management into MTCO2e, composting and landfilling. The EPA Pollution Prevention (P2) Cost Calculator that estimates cost savings emissions from burning 743 railcars' worth of coal (over 11 1/4 miles long) Accomplishments Reductions

  17. Consequence Assessment

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

  18. Patch detection for pavement assessment

    E-Print Network [OSTI]

    Radopoulou, Stefania C.; Brilakis, Ioannis

    2015-03-21T23:59:59.000Z

    Pavement management systems rely on comprehensive up-to-date road condition data to provide effective decision support for short, medium and long term maintenance scheduling. However, the cost per mile of the existing condition data collection...

  19. The future of FRMAC assessment.

    SciTech Connect (OSTI)

    Laiche, Thomas P.

    2010-03-01T23:59:59.000Z

    FRMAC was born out of circumstances 25 years ago when 17 federal agencies descended on the states with good intention during the Three-Mile Island nuclear power plant incident. At that time it quickly became evident that a better way was needed to support state and local governments in their time of emergency and recovery process. FRMAC's single voice of Federal support coordinates the multiple agencies that respond to a radiological event. Over the years, FRMAC has exercised, evaluated, and honed its ability to quickly respond to the needs of our communities. As the times have changed, FRMAC has expanded its focus from nuclear power plant incidents, to threats of a terrorist radiological dispersal device (RDD), to the unthinkable - an Improvised nuclear device (IND). And just as having the right tools are part of any trade, FRMAC's tool set has and is evolving to meet contemporary challenges - not just to improve the time it takes to collect data and assess the situation, but to provide a quality and comprehensive product that supports a stressed decision maker, responsible for the protection of the public. Innovations in the movement of data and information have changed our everyday lives. So too, FRMAC is capitalizing on industry innovations to improve the flow of information: from the early predictive models, to streamlining the process of getting data out of the field; to improving the time it takes to get assessed products in to the hands of the decision makers. FRMAC is focusing on the future through the digital age of electronic data processing. Public protective action and dose avoidance is the challenge.

  20. EA-1366: Preliminary Environmental Assessment | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General...

  1. Risk Assessment

    Broader source: Energy.gov [DOE]

    A set of issues that state and local governments should carefully consider, with the goal of helping them assess and anticipate solutions for some worst case or unfortunate case scenarios as they...

  2. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    surface and the lower part of the atmosphere; this phenomenon is called the greenhouse effect. U.S. Department of Energy DOEEA-1728D Draft Environmental Assessment 32 June...

  3. Draft environmental assessment -- Test Area North pool stabilization project update

    SciTech Connect (OSTI)

    NONE

    1997-06-01T23:59:59.000Z

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  4. Integrated Environmental Assessment Part III: Exposure Assessment

    E-Print Network [OSTI]

    McKone, Thomas E.; Small, Mitchell J.

    2006-01-01T23:59:59.000Z

    issues such as life cycle assessment (LCA) fosters the needlife-cycle impact assessment (LCIA) process within in LCA is

  5. Corridor Information Corridor Length (miles)

    E-Print Network [OSTI]

    -- Rest of PA Allentown PA-NJ Harrisburg Philadelphia PA PA PA US-22 WB I-83 NB Schuylkill Expy/I-76 WB 15

  6. Corridor Information Corridor Length (miles)

    E-Print Network [OSTI]

    Expy/I-290 WB I-290 WB Stevenson Expy/I-55 NB S Ashland Ave/Exit 28B I-88/Exit 15A US-20/US-45/US-12

  7. Three Mile Island Unit 1 Main Steam Line Break Three-Dimensional Neutronics/Thermal-Hydraulics Analysis: Application of Different Coupled Codes

    SciTech Connect (OSTI)

    D'Auria, Francesco [Universita di Pisa (Italy); Moreno, Jose Luis Gago [Universidad Politecnica de Barcelona (Spain); Galassi, Giorgio Maria [Universita di Pisa (Italy); Grgic, Davor [University of Zagreb (Croatia); Spadoni, Antonino [Universita di Pisa (Italy)

    2003-05-15T23:59:59.000Z

    A comprehensive analysis of the double ended main steam line break (MSLB) accident assumed to occur in the Babcock and Wilcox Three Mile Island Unit 1 (TMI-1) has been carried out at the Dipartimento di Ingegneria Meccanica, Nucleare e della Produzione of the University of Pisa, Italy, in cooperation with the University of Zagreb, Croatia. The overall activity has been completed within the framework of the participation in the Organization for Economic Cooperation and Development-Committee on the Safety of Nuclear Installations-Nuclear Science Committee pressurized water reactor MSLB benchmark.Thermal-hydraulic system codes (various versions of Relap5), three-dimensional (3-D) neutronics codes (Parcs, Quabbox, and Nestle), and one subchannel code (Cobra) have been adopted for the analysis. Results from the following codes (or code versions) are assumed as reference:1. Relap5/mod3.2.2, beta version, coupled with the 3-D neutron kinetics Parcs code parallel virtual machine (PVM) coupling2. Relap5/mod3.2.2, gamma version, coupled with the 3-D neutron kinetics Quabbox code (direct coupling)3. Relap5/3D code coupled with the 3-D neutron kinetics Nestle code.The influence of PVM and of direct coupling is also discussed.Boundary and initial conditions of the system, including those relevant to the fuel status, have been supplied by Pennsylvania State University in cooperation with GPU Nuclear Corporation (the utility, owner of TMI) and the U.S. Nuclear Regulatory Commission. The comparison among the results obtained by adopting the same thermal-hydraulic nodalization and the coupled code version is discussed in this paper.The capability of the control rods to recover the accident has been demonstrated in all the cases as well as the capability of all the codes to predict the time evolution of the assigned transient. However, one stuck control rod caused some 'recriticality' or 'return to power' whose magnitude is largely affected by boundary and initial conditions.

  8. Risk management & organizational uncertainty implications for the assessment of high consequence organizations

    SciTech Connect (OSTI)

    Bennett, C.T.

    1995-02-23T23:59:59.000Z

    Post hoc analyses have demonstrated clearly that macro-system, organizational processes have played important roles in such major catastrophes as Three Mile Island, Bhopal, Exxon Valdez, Chernobyl, and Piper Alpha. How can managers of such high-consequence organizations as nuclear power plants and nuclear explosives handling facilities be sure that similar macro-system processes are not operating in their plants? To date, macro-system effects have not been integrated into risk assessments. Part of the reason for not using macro-system analyses to assess risk may be the impression that standard organizational measurement tools do not provide hard data that can be managed effectively. In this paper, I argue that organizational dimensions, like those in ISO 9000, can be quantified and integrated into standard risk assessments.

  9. Geothermal resource assessment of the Yucca Mountain Area, Nye County, Nevada. Final report

    SciTech Connect (OSTI)

    Flynn, T.; Buchanan, P.; Trexler, D. [Nevada Univ., Las Vegas, NV (United States). Harry Reid Center for Environmental Studies, Division of Earth Sciences; Shevenell, L., Garside, L. [Nevada Univ., Reno, NV (United States). Mackay School of Mines, Nevada Bureau of Mines and Geology

    1995-12-01T23:59:59.000Z

    An assessment of the geothermal resources within a fifty-mile radius of the Yucca Mountain Project area was conducted to determine the potential for commercial development. The assessment includes collection, evaluation, and quantification of existing geological, geochemical, hydrological, and geophysical data within the Yucca Mountain area as they pertain to geothermal phenomena. Selected geologic, geochemical, and geophysical data were reduced to a set of common-scale digital maps using Geographic Information Systems (GIS) for systematic analysis and evaluation. Available data from the Yucca Mountain area were compared to similar data from developed and undeveloped geothermal areas in other parts of the Great Basin to assess the resource potential for future geothermal development at Yucca Mountain. This information will be used in the Yucca Mountain Site Characterization Project to determine the potential suitability of the site as a permanent underground repository for high-level nuclear waste.

  10. Assessment Documents

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0 ARRA NewslettersPartnership of theArctic Energy Summit26 Assessment

  11. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment

  12. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment 728D

  13. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment

  14. Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding accessPeptoid Nanosheets Offer a Diversity ofPerformance assessment

  15. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  16. Assessor Training Assessment Techniques

    E-Print Network [OSTI]

    NVLAP Assessor Training Assessment Techniques: Communication Skills and Conducting an Assessment listener ·Knowledgeable Assessor Training 2009: Assessment Techniques: Communication Skills & Conducting, truthful, sincere, discrete · Diplomatic · Decisive · Selfreliant Assessor Training 2009: Assessment

  17. Flibe assessments.

    SciTech Connect (OSTI)

    Sze, D. K.; McCarthy, K.; Sawan, M.; Tillack, M.; Ying, A.; Zinkle, S.

    2000-11-15T23:59:59.000Z

    An assessment of the issues on using flibe for fusion applications has been made. It is concluded that sufficient tritium breeding can be achieved for a flibe blanket, especially if a few cm of Be is include in the blanket design. A key issue is the control of the transmutation products such as TF and F{sub 2}. A REDOX (Reducing-Oxidation) reaction has to be demonstrated which is compatible to the blanket design. Also, MHD may have strong impact on heat transfer if the flow is perpendicular to the magnetic field. The issues associated with the REDOX reaction and the MHD issues have to be resolved by both experimental program and numerical solutions.

  18. NANA Wind Resource Assessment Program Final Report

    SciTech Connect (OSTI)

    Jay Hermanson

    2010-09-23T23:59:59.000Z

    NANA Regional Corporation (NRC) of northwest Alaska is located in an area with abundant wind energy resources. In 2007, NRC was awarded grant DE-FG36-07GO17076 by the US Department of Energy's Tribal Energy Program for funding a Wind Resource Assessment Project (WRAP) for the NANA region. The NANA region, including Kotzebue Electric Association (KEA) and Alaska Village Electric Cooperative (AVEC) have been national leaders at developing, designing, building, and operating wind-diesel hybrid systems in Kotzebue (starting in 1996) and Selawik (2002). Promising sites for the development of new wind energy projects in the region have been identified by the WRAP, including Buckland, Deering, and the Kivalina/Red Dog Mine Port Area. Ambler, Shungnak, Kobuk, Kiana, Noorvik & Noatak were determined to have poor wind resources at sites in or very near each community. However, all five of these communities may have better wind resources atop hills or at sites with slightly higher elevations several miles away.

  19. Assessment 101: The Assessment Cycle, Clear and

    E-Print Network [OSTI]

    Su, Xiao

    Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014 Kellogg West Conference Center, Pomona, CA Resource Binder #12;2014-2015 WASC Senior College and University Commission is pleased expectations. Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014. Kellogg West, Pomona, CA

  20. Fort Stewart integrated resource assessment. Volume 1, Executive summary

    SciTech Connect (OSTI)

    Larson, L.L.; Keller, J.M.

    1993-10-01T23:59:59.000Z

    The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.

  1. McKenzie River Subbasin Assessment, Summary Report 2000.

    SciTech Connect (OSTI)

    Alsea Geospatial, Inc.

    2000-02-01T23:59:59.000Z

    This document summarizes the findings of the McKenzie River Subbasin Assessment: Technical Report. The subbasin assessment tells a story about the McKenzie River watershed. What is the McKenzie's ecological history, how is the McKenzie doing today, and where is the McKenzie watershed headed ecologically? Knowledge is a good foundation for action. The more we know, the better prepared we are to make decisions about the future. These decisions involve both protecting good remaining habitat and repairing some of the parts that are broken in the McKenzie River watershed. The subbasin assessment is the foundation for conservation strategy and actions. It provides a detailed ecological assessment of the lower McKenzie River and floodplain, identifies conservation and restoration opportunities, and discusses the influence of some upstream actions and processes on the study area. The assessment identifies restoration opportunities at the reach level. In this study, a reach is a river segment from 0.7 to 2.7 miles long and is defined by changes in land forms, land use, stream junctions, and/or cultural features. The assessment also provides flexible tools for setting priorities and planning projects. The goal of this summary is to clearly and concisely extract the key issues, findings, and recommendations from the full-length Technical Report. The high priority recommended action items highlight areas that the McKenzie Watershed Council can significantly influence, and that will likely yield the greatest ecological benefit. People are encouraged to read the full Technical Report if they are interested in the detailed methods, findings, and references used in this study.

  2. Assessment of Future Vehicle Transportation Options and Their...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the United States while simultaneously reducing GHGs through the expanded use of renewable electricity-fueled transportation and reduced emissions per vehicle-mile (VMT). On a...

  3. DRAFT. ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS

    E-Print Network [OSTI]

    Sullivan, S.M.

    2014-01-01T23:59:59.000Z

    winds. During E weather small craft anchor 0.5 mile offshorewinds, and 100-cm sec surface currents. Living quarters will be provided in offshore

  4. Strategic Plan Environmental Assessment

    E-Print Network [OSTI]

    Strategic Plan Environmental Assessment 2009 Clinical Center National Institutes of Health U Institutes of Health Strategic Plan ­ Environmental Assessment 2009 Contents Executive Summary environmental assessment to determine Clinical Center strengths, weaknesses, opportunities, and threats

  5. Robins Air Force Base integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01T23:59:59.000Z

    The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins Air Force Base (AFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the AFMC Robins AFB facility located approximately 15 miles south of Macon, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 13 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative-description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  6. ORISE: Hazard Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assesses both chemical and radiation exposures, and conducts both internal and external radiation dose assessments. Our capabililities include: Linkage of exposure data to site...

  7. Solar radiation resource assessment

    SciTech Connect (OSTI)

    Not Available

    1990-11-01T23:59:59.000Z

    The bulletin discusses the following: introduction; Why is solar radiation resource assessment important Understanding the basics; the solar radiation resource assessment project; and future activities.

  8. An improved methodology for multi-criteria assessment of highway sustainability

    E-Print Network [OSTI]

    Ramani, Tara Lakshmi

    2009-05-15T23:59:59.000Z

    Development of Performance Indicators ................................................................................. 16 Goal 1: Reduce Congestion ................................................................................................. 17 Goal 2... of Total Person-Miles of Travel in Non-SOVs .................................................. 42 Daily NO x , CO, and VOC Emissions in Grams per Mile .................................................... 43 Daily CO 2 Emissions in Grams per Mile...

  9. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho. Final

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site.

  10. NRCS CSREES Watershed Assessments

    E-Print Network [OSTI]

    .E.A.P. Conservation Effects Assessment Project #12;Measuring the Environmental Benefits of Conservation;Conservation Effects Assessment Project Please turn off the ringers on your cell phones, pagers, blackberries The Conservation EffectsThe Conservation Effects Assessment ProjectAssessment Project (CEAP)(CEAP) #12;Scope

  11. ASSESSMENT FOR THE SOUTHWEST

    E-Print Network [OSTI]

    Wong, Pak Kin

    SERVICE CLIMATE CHANGE & CULTURAL RESOURCE PLANNING PROGRAM 17 EARTH SYSTEM MODELS 18 CLIMATE ASSESSMENTS

  12. Distributed road assessment system

    DOE Patents [OSTI]

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25T23:59:59.000Z

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  13. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  14. Solar Resource Assessment

    SciTech Connect (OSTI)

    Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

    2008-02-01T23:59:59.000Z

    This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

  15. Edinburgh Motor Assessment (EMAS) 

    E-Print Network [OSTI]

    Bak, Thomas

    2013-12-01T23:59:59.000Z

    Edinburgh Motor Assessment (EMAS) is a brief motor screening test, specifically designed for assessment of patients with dementia, aphasia and other cognitive disorders. It focuses, therefore, on those motor symptoms, ...

  16. Survey of Biomass Resource Assessments and Assessment Capabilities...

    Open Energy Info (EERE)

    Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of...

  17. Writing Assessment: Additional Resources

    E-Print Network [OSTI]

    Schweik, Charles M.

    29 Appendix A Writing Assessment: Additional Resources #12;30 Where can I find out more into the assessment process. On-campus resources give you with a "real person" to contact should you have questions Resources for Higher Education Outcomes Assessment http://www2.acs.ncsu.edu/UPA/survey/resource.htm Ohio

  18. Management Assessment and Independent Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-31T23:59:59.000Z

    The revision to this Guide reflects current assessment practices, international standards, and changes in the Department of Energy expectations. Cancels DOE G 414.1-1. Canceled by DOE G 414.1-1B.

  19. Assessing the assessments: Pharmaceuticals in the environment

    SciTech Connect (OSTI)

    Enick, O.V. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: oana.enick@gov.bc.ca; Moore, M.M. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: mmoore@sfu.ca

    2007-11-15T23:59:59.000Z

    The relatively new issue of pharmaceutical contamination of the environment offers the opportunity to explore the application of values to the construction, communication and management of risk. The still-developing regulatory policies regarding environmental contamination with pharmaceuticals provide fertile ground for the introduction of values into the definition and management of risk. In this report, we summarize the current knowledge regarding pharmaceutical contamination of the environment and discuss specific attributes of pharmaceuticals that require special consideration. We then present an analysis showing that if values are incorporated into assessing, characterizing and managing risk, the results of risk assessments will more accurately reflect the needs of various stakeholders. Originating from an acknowledgement of the inherent uncertainty and value-laden nature of risk assessment, the precautionary principle (and later, the multi-criteria, integrated risk assessment), provides a direction for further research and policy development.

  20. Home Energy Assessments

    ScienceCinema (OSTI)

    Dispenza, Jason

    2013-05-29T23:59:59.000Z

    A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

  1. Environmental Assessment: geothermal direct heat project, Marlin, Texas

    SciTech Connect (OSTI)

    Not Available

    1980-08-01T23:59:59.000Z

    The Federal action addressed by this Environmental Assessment (EA) is joint funding the retrofitting of a heating and hot water system in a hospital at Marlin, Texas, with a geothermal preheat system. The project will be located within the existing hospital boiler room. One supply well was drilled in an existing adjacent parking lot. It was necessary to drill the well prior to completion of this environmental assessment in order to confirm the reservoir and to obtain fluids for analysis in order to assess the environmental effects of fluid disposal. Fluid from operation will be disposed of by discharging it directly into existing street drains, which will carry the fluid to Park Lake and eventually the Brazos River. Fluid disposal activities are regulated by the Texas Railroad Commission. The local geology is determined by past displacements in the East Texas Basin. Boundaries are marked by the Balcones and the Mexia-Talco fault systems. All important water-bearing formations are in the cretaceous sedimentary rocks and are slightly to highly saline. Geothermal fluids are produced from the Trinity Group; they range from approximately 3600 to 4000 ppM TDS. Temperatures are expected to be above 64/sup 0/C (147/sup 0/F). Surface water flows southeastward as a part of the Brazos River Basin. The nearest perennial stream is the Brazos River 5.6 km (3.5 miles) away, to which surface fluids will eventually discharge. Environmental impacts of construction were small because of the existing structures and paved areas. Construction run-off and geothermal flow-test fluid passed through a small pond in the city park, lowering its water quality, at least temporarily. Construction noise was not out of character with existing noises around the hospital.

  2. Survey of Biomass Resource Assessments and Assessment Capabilities

    E-Print Network [OSTI]

    Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Energy ...................................................................................................................................4 Biomass Resource Assessment Products and Assessment Methodologies, Department of Industry, Tourism and Resources, Australia Ms. Siti Hafsah, Office of the Minister of Energy

  3. Cape Canaveral Air Force Station integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Sandusky, W.F.; Eichman, C.J.; King, D.A.; McMordie, K.L.; Parker, S.A.; Shankle, S.A.; Wahlstrom, R.R.

    1994-03-01T23:59:59.000Z

    The U.S. Air Force (USAF) has tasked the Pacific Northwest Laboratory (PNL) in support of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Cape Canaveral Air Force Station (AFS). Projects considered can be either in the form of energy management or energy conservation. The overall efforts of this task are based on a model program PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at Cape Canaveral AFS, which is located approximately 10 miles north of Cocoa Beach, Florida. It is a companion report to Volume 1: Executive Summary and Volume 2: Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings, impacts on operations and maintenance (O&M), and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. Descriptions of the evaluation methodologies and technical and cost assumptions are also provided for each ERO. Summary tables present the cost- effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis, indicating the net present value (NPV) and savings-to-investment ratio (SIR) of each ERO.

  4. Test Area North Pool Stabilization Project: Environmental assessment

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The Test Area North (TAN) Pool is located within the fenced TAN facility boundaries on the Idaho National Engineering Laboratory (INEL). The TAN pool stores 344 canisters of core debris from the March, 1979, Three Mile Island (TMI) Unit 2 reactor accident; fuel assemblies from Loss-of-Fluid Tests (LOFT); and Government-owned commercial fuel rods and assemblies. The LOFT and government owned commercial fuel rods and assemblies are hereafter referred to collectively as {open_quotes}commercial fuels{close_quotes} except where distinction between the two is important to the analysis. DOE proposes to remove the canisters of TMI core debris and commercial fuels from the TAN Pool and transfer them to the Idaho Chemical Processing Plant (ICPP) for interim dry storage until an alternate storage location other than at the INEL, or a permanent federal spent nuclear fuel (SNF) repository is available. The TAN Pool would be drained and placed in an industrially and radiologically safe condition for refurbishment or eventual decommissioning. This environmental assessment (EA) identifies and evaluates environmental impacts associated with (1) constructing an Interim Storage System (ISS) at ICPP; (2) removing the TMI and commercial fuels from the pool and transporting them to ICPP for placement in an ISS, and (3) draining and stabilizing the TAN Pool. Miscellaneous hardware would be removed and decontaminated or disposed of in the INEL Radioactive Waste Management Complex (RWMC). This EA also describes the environmental consequences of the no action alternative.

  5. ESCO PRELIMINARY ASSESSMENT TEMPLATE

    Broader source: Energy.gov [DOE]

    Document presents a template and example to help energy service companies (ESCOs) conduct preliminary assessments required for Federal energy savings performance contract (ESPC) projects.

  6. Hoisting & Rigging Assessment Form

    Broader source: Energy.gov [DOE]

      Assess the institutional and department/division hoisting and rigging (including forklift, overhead cranes small hoists, and mobile cranes) requirements, policies, procedures, and work practices...

  7. Sandia Energy - Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    petroleum storage and refineries; and transportation systems. Assessments were an early way to help clarify the systems as they existed in the field. This knowledge has...

  8. NATURAL GAS MARKET ASSESSMENT

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION NATURAL GAS MARKET ASSESSMENT PRELIMINARY RESULTS In Support.................................................................................... 6 Chapter 2: Natural Gas Demand.................................................................................................. 10 Chapter 3: Natural Gas Supply

  9. Wind resource assessment: San Nicolas Island, California

    SciTech Connect (OSTI)

    McKenna, E. [National Renewable Energy Lab., Golden, CO (United States); Olsen, T.L. [Timothy L. Olsen Consulting, (United States)

    1996-01-01T23:59:59.000Z

    San Nicolas Island (SNI) is the site of the Navy Range Instrumentation Test Site which relies on an isolated diesel-powered grid for its energy needs. The island is located in the Pacific Ocean 85 miles southwest of Los Angeles, California and 65 miles south of the Naval Air Weapons Station (NAWS), Point Mugu, California. SNI is situated on the continental shelf at latitude N33{degree}14` and longitude W119{degree}27`. It is approximately 9 miles long and 3.6 miles wide and encompasses an area of 13,370 acres of land owned by the Navy in fee title. Winds on San Nicolas are prevailingly northwest and are strong most of the year. The average wind speed is 7.2 m/s (14 knots) and seasonal variation is small. The windiest months, March through July, have wind speeds averaging 8.2 m/s (16 knots). The least windy months, August through February, have wind speeds averaging 6.2 m/s (12 knots).

  10. California Energy Commission Systems Assessment & Facilities Division

    E-Print Network [OSTI]

    ,000 1,500 2,000 2,500250 Miles Scale 1:30,000,000 GCS WGS 1984 Projection Legend Worldwide LNG Marine Worldwide Liquefied Natural Gas Marine Terminals June, 2010 T:\\Projects\\CEC\\World LNG FILENAME:World_ LNG_6

  11. Assessments A Training Manual

    E-Print Network [OSTI]

    Modern Industrial Assessments A Training Manual Version 2.0 Sponsored by: Produced by: Dr. Michael. Modern Industrial Assessments: A Training Manual, grew from the desires of the United States Department conservation and waste minimization / pollution prevention training courses and information agencies sponsored

  12. Service Assessment HURRICANE FRAN

    E-Print Network [OSTI]

    Service Assessment HURRICANE FRAN August 28 - September 8, 1996 U.S.Department of Commerce National-12 Visible, 753 a.m. EDT, September4, 1996. #12;Service Assessment HURRICANE FRAN August 28 Bureau Hurricane Series ERRATA NOTICE One or more conditions of the original document may affect

  13. Final Draft ENVIRONMENTAL ASSESSMENT

    E-Print Network [OSTI]

    Waliser, Duane E.

    Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE OF THE CONSTELLATION PROGRAM, JOHN F. KENNEDY SPACE CENTER, FLORIDA Abstract This Environmental Assessment addresses AERONAUTICS AND SPACE ADMINISTRATION JOHN F. KENNEDY SPACE CENTER ENVIRONMENTAL PROGRAM OFFICE KENNEDY SPACE

  14. Assessment Statute Academic Policy

    E-Print Network [OSTI]

    Frean, Marcus

    ) and reliability (accurately representing the student's performance). #12;Assessment Statute Academic Policy to write clearly and accurately may be an important component of the assessment. 4.2 Passing a Course (a items. Lectures, tutorials, electronic and other distance- learning resources, practical and fieldwork

  15. INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER

    SciTech Connect (OSTI)

    MELINDA KRAHENBUHL

    2010-05-28T23:59:59.000Z

    The U. S. Department of Energy’s Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

  16. NNSA to conduct Aerial Radiation Assessment Survey over Phoenix...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at a speed of approximately 80 miles per hour. Flyovers will occur only during daylight hours and it is estimated to take about three hours to complete per area. The...

  17. DOE/EA-0978 ENVIRONMENTAL ASSESSMENT SLUDGE STABILIZATION AT

    Broader source: Energy.gov (indexed) [DOE]

    of chemistry and Physics, Robert C. Weast, Ph.D., 70th Ed., 1989-1990, CRC Press, Inc., Boca Raton, Florida. square 0.39 square miles square kilometers centimeters G-3 October...

  18. Environmental assessment of electricity scenarios with Life Cycle Assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    been assessed with Life Cycle Assessment (LCA) studies [1], [2], [3] and [4]. However environmentalEnvironmental assessment of electricity scenarios with Life Cycle Assessment Touria Larbi1 impacts assessment of scenarios is very rarely evaluated through a life cycle perspective partly because

  19. The Idaho National Engineering and Environmental Laboratory Source Water Assessment

    SciTech Connect (OSTI)

    Sehlke, G.

    2003-03-17T23:59:59.000Z

    The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 square miles and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL's drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey's Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency's Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a this vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL's Source Water Assessment. Of the INEEL's 12 public water systems, three systems rated as low susceptibility (EBR-1, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL's public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

  20. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    SciTech Connect (OSTI)

    Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

    1984-12-01T23:59:59.000Z

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  1. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  2. Geothermal reservoir assessment case study: Northern Dixie Valley, Nevada

    SciTech Connect (OSTI)

    Denton, J.M.; Bell, E.J.; Jodry, R.L.

    1980-11-01T23:59:59.000Z

    Two 1500 foot temperature gradient holes and two deep exploratory wells were drilled and tested. Hydrologic-hydrochemical, shallow temperature survey, structural-tectonic, petrologic alteration, and solid-sample geochemistry studies were completed. Eighteen miles of high resolution reflection seismic data were gathered over the area. The study indicates that a geothermal regime with temperatures greater than 400/sup 0/F may exist at a depth of approximately 7500' to 10,000' over an area more than ten miles in length.

  3. Taking the tire the final mile

    SciTech Connect (OSTI)

    Moore, G.A. [Scott County Health Dept., Davenport, IA (United States); Wuestenberg, T.; Hall, J.

    1995-07-01T23:59:59.000Z

    In 1990 the Scott County Health Department formed a local Waste Tire Task Force to address the growing problem of illegally dumped tires in Scott County, Iowa. Strategies developed by the task force included providing convenient, low cost disposal; increasing public awareness; and promoting participation in recycling efforts. The task force has held several free waste tire collections, including Waste Tire Amnesty Days and an Earth Week event. At the recommendation of the task force, regular tire disposal fees at the Scott County Landfill, operated by the Scott Area Solid Waste Management Commission, were also reduced. Through the task force efforts, 107,000 waste tires, including several stockpiles, have been recovered in Scott County. Many were recycled, some at a local cement plant, which used them as fuel for a test burn. Complaints to the health department regarding accumulations of waste tires have decreased. The commitment to managing waste tires in Scott County is ongoing; the most recent free, tire disposal day was held in May 1994.

  4. square miles | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty Edit withTianlinPapersWindey Wind Home Rmckeel'slinkedpolicyreviewland use

  5. Chapter 3. Vehicle-Miles Traveled

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,128 2,469 2,321Spain (Million Cubic 1. Introduction

  6. 1st Mile | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 Wind Projectsource HistorykVOpenOpen EnergyEnergySoltech

  7. OpenEI Community - square miles

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRoseConcernsCompany Oil and GasOff<div/0Agency (DLA) RFP - Deadline -

  8. Integrated assessment briefs

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

  9. An Analysis of Two Industrial Assessment Center Extended Assessments

    E-Print Network [OSTI]

    Farouz, H. E.; Gafford, G. D.; Eggebrecht, J. A.; Heffington, W. M.

    The Industrial Assessment Center at Texas A&M University extended assessments by spending about two extra days at each of three manufacturing plants. The extended assessments are characterized by use of sophisticated electronic monitoring equipment...

  10. assessment ioa assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

  11. DOEEA-1203 Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    eve1 m i xed waste low-level waste National Environmental Policy Act o f 1969 performance assessment Resource Conservation and Recovery Act o f 1976 roentgen equi valent man...

  12. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  13. Literacy Assessment Using

    E-Print Network [OSTI]

    Qian, Ning

    Literacy Assessment Using Mobile Technology Sarah Muffly The Earth Institute and new mobile monitoring technologies. This could be carried out, it makes use of mobile technology to record and disseminate results

  14. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15T23:59:59.000Z

    The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

  15. RISK ASSESSMENT CLOUD COMPUTING

    E-Print Network [OSTI]

    Columbia University

    SECURITY RESEARCH PRIVACY RISK ASSESSMENT AMC DATA FISMA CLOUD COMPUTING MOBILE DEVICES OPERATIONS application hosted in the cloud · Alaska DHHS fined $1.7M ­ Portable device stolen from vehicle · Mass Eye

  16. Colorado Statewide Forest Resource Assessment

    E-Print Network [OSTI]

    Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Private Forestry Redesign Initiative 2 National Guidance for Statewide Forest Resource Assessments 4 The Colorado Statewide Resource Assessment and all appendices are available online on the Colorado State Forest

  17. Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartmentWind Siting Articles about WindAssessments Assessments

  18. Sandia Energy - Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment Home Climate & Earth Systems WaterEnergy Nexus Water Monitoring & Treatment Technology Security Risk Assessment Security Risk Assessmentcwdd2015-05-04T21:...

  19. National Geothermal Resource Assessment and Classification |...

    Office of Environmental Management (EM)

    Resource Assessment and Classification National Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification presentation at the...

  20. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    SciTech Connect (OSTI)

    Not Available

    1984-05-01T23:59:59.000Z

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

  1. DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment

    E-Print Network [OSTI]

    DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment DRAFT May 25 2004 Compiled. Fifteenmile Subbasin Assessment 1 Assessment Overview 1 3.1. Subbasin Overview 2 3.1.1. General Description 2.4. Limiting Environmental Factors and Populations of Aquatic Species 39 3.4.1. Winter Steelhead in Fifteenmile

  2. Windows technology assessment

    SciTech Connect (OSTI)

    Baron, J.J.

    1995-10-01T23:59:59.000Z

    This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

  3. University Assessment Contacts Academic Units

    E-Print Network [OSTI]

    Escher, Christine

    .j.arp@oregonstate.edu 541-737-2331 Notes: Agricultural and Resource Economics Assessment Rep: Email: Phone: Penelope DiebelUniversity Assessment Contacts Academic Units COLLEGE OF AGRICULTURAL SCIENCES Assessment Rep.Capalbo@oregonstate.edu 541-737-5639 Notes: Agricultural Education and Agricultural Sciences Assessment Rep: Email: Phone

  4. Industrial Assessment Center

    SciTech Connect (OSTI)

    Dr. Diane Schaub

    2007-03-05T23:59:59.000Z

    Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

  5. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  6. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  7. Preliminary assessment report for Olney Military Reservation, Installation 24175, Olney, Maryland. Installation Restoration Program

    SciTech Connect (OSTI)

    Hansen, J.; Rose, C.

    1993-07-01T23:59:59.000Z

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Maryland Army National Guard property near Olney, Maryland. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies Phase I of the US Department of Defense Installation Restoration Program for Olney Military Reservation property. Olney Military Reservation is an 8-acre site located in the southwestern portion of Maryland, about six miles northwest of Washington, DC, in Montgomery County. The major facilities included in this PA comprise the administration building, barracks, and motor repair shops. The environmentally significant operations associated with the property are underground and aboveground storage tanks, a vehicle wash rack, a flammable materials storage area (a lean-to structure), and a hazardous materials storage building. The review of both historical and current practices at the property indicates that Olney Military Reservation property poses no immediate threat to human health or the environment. Argonne`s reviewers noted several historical potential threats to the environment that have occurred at the property that installation personnel have corrected or eliminated.

  8. Geothermal-resource assessment of the Steamboat-Routt Hot Springs area, Colorado. Resources Series 22

    SciTech Connect (OSTI)

    Pearl, R.H.; Zacharakis, T.G.; Ringrose, C.D.

    1983-01-01T23:59:59.000Z

    An assessment of the Steamboat Springs region in northwest Colorado was initiated and carried out in 1980 and 1981. The goal of this program was to delineate the geological features controlling the occurrence of the thermal waters (temperatures in excess of 68/sup 0/F (20/sup 0/C)) in this area at Steamboat Springs and 8 miles (12.8 km) north at Routt Hot Springs. Thermal waters from Heart Spring, the only developed thermal water source in the study area, are used in the municipal swimming pool in Steamboat Springs. The assessment program was a fully integrated program consisting of: dipole-dipole, Audio-magnetotelluric, telluric, self potential and gravity geophysical surveys, soil mercury and soil helium geochemical surveys; shallow temperature measurements; and prepartion of geological maps. The investigation showed that all the thermal springs appear to be fault controlled. Based on the chemical composition of the thermal waters it appears that Heart Spring in Steamboat Springs is hydrologically related to the Routt Hot Springs. This relationship was further confirmed when it was reported that thermal waters were encountered during the construction of the new high school in Strawberry Park on the north side of Steamboat Springs. In addition, residents stated that Strawberry Park appears to be warmer than the surrounding country side. Geological mapping has determined that a major fault extends from the Routt Hot Springs area into Strawberry Park.

  9. Graduate Assessment Strategies 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The

    E-Print Network [OSTI]

    Graduate Assessment Strategies Resources: 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The graduate level assessment plans from OSU may be particularly helpful: http://oregonstate.edu/admin/aa/apaa/assessment/graduate-assessment/graduate- assessment-plans 2. A list of best practices is online at http://inside.mines.edu/UserFiles/File/Assessment

  10. Geothermal industry assessment

    SciTech Connect (OSTI)

    Not Available

    1980-07-01T23:59:59.000Z

    An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

  11. Watershed Assessment Program Team

    E-Print Network [OSTI]

    ­ Proposal to model urban storm-water control practices · Teach advanced graduate course ­ BASINS and SWAT · Monitoring Activities · Modeling Activities · Remote Sensing / GIS · Sources of Funding · What do We Need · Much more monitoring being done by cities and local governments ­ Source water assessment work done

  12. ESPA Deltas: Assessing Health,

    E-Print Network [OSTI]

    Sóbester, András

    weather events and sea-level rise, coupled with population growth and urbanisation. The Project The ESPAEcosystems Livelihood Services Poverty Community ESPA Deltas: Assessing Health, Livelihoods www.espadeltas.net@EspaDeltas Who are the poor? Who are the key stakeholders and what are their roles

  13. Functional Area Assessments Project Charter Workstream Name Functional Area Assessments

    E-Print Network [OSTI]

    Sheridan, Jennifer

    with Huron on detailed project plan. Subject Experts Subject Expert Role Functional leadership Administrative1 of 2 Functional Area Assessments ­ Project Charter Workstream Name Functional Area Assessments - Internal Budgeting - Human Resources These diagnostics will be performed using interviews, surveys, data

  14. Composite heat damage assessment

    SciTech Connect (OSTI)

    Janke, C.J.; Wachter, E.A. [Oak Ridge National Lab., TN (United States); Philpot, H.E. [Oak Ridge K-25 Site, TN (United States); Powell, G.L. [Oak Ridge Y-12 Plant, TN (United States)

    1993-12-31T23:59:59.000Z

    The effects of heat damage were determined on the residual mechanical, physical, and chemical properties of IM6/3501-6 laminates, and potential nondestructive techniques to detect and assess material heat damage were evaluated. About one thousand preconditioned specimens were exposed to elevated temperatures, then cooled to room temperature and tested in compression, flexure, interlaminar shear, shore-D hardness, weight loss, and change in thickness. Specimens experienced significant and irreversible reduction in their residual properties when exposed to temperatures exceeding the material upper service temperature of this material (350{degrees}F). The Diffuse Reflectance Infrared Fourier Transform and Laser-Pumped Fluorescence techniques were found to be capable of rapid, in-service, nondestructive detection and quantitation of heat damage in IM6/3501- 6. These techniques also have the potential applicability to detect and assess heat damage effects in other polymer matrix composites.

  15. Assessment summary, Jan. 2004

    E-Print Network [OSTI]

    Education Provision of a suite of short (1-2 day), industry-focused courses Delivered in Cambridge UK by MIT and CU faculty Premium priced - £500-£600 per delegate day Targeted at the technology/business interface Heavy upfront investment in development... , Collins) KE Practices Decide on model contract notion (w/Aldridge) Decide/commission performer on univ-industry best practice study Assessment: January 2003 EHGI meeting: Edinburgh*, Strathclyde*, Sheffield*, CU, Lancaster, Durham, Loughborough, MIT...

  16. Environmental epidemiology: risk assessment

    SciTech Connect (OSTI)

    Prentice, R.L.; Whittemore, A.S. (eds.)

    1982-01-01T23:59:59.000Z

    Papers presented at the symposium are in the disciplines of biometry, environmental medicine, epidemiology, mathematics, and statistics. Attention is given to assessing risk due to environmental agents, particularly those known to be carcinogenic; both the complex medical issues involved and the mathematical and statistical methodologies used in analysis are presented. Separate abstracts have been prepared for 15 papers for inclusion in the Energy Data Base. (RJC)

  17. PUREX facility hazards assessment

    SciTech Connect (OSTI)

    Sutton, L.N.

    1994-09-23T23:59:59.000Z

    This report documents the hazards assessment for the Plutonium Uranium Extraction Plant (PUREX) located on the US Department of Energy (DOE) Hanford Site. Operation of PUREX is the responsibility of Westinghouse Hanford Company (WHC). This hazards assessment was conducted to provide the emergency planning technical basis for PUREX. DOE Order 5500.3A requires an emergency planning hazards assessment for each facility that has the potential to reach or exceed the lowest level emergency classification. In October of 1990, WHC was directed to place PUREX in standby. In December of 1992 the DOE Assistant Secretary for Environmental Restoration and Waste Management authorized the termination of PUREX and directed DOE-RL to proceed with shutdown planning and terminal clean out activities. Prior to this action, its mission was to reprocess irradiated fuels for the recovery of uranium and plutonium. The present mission is to establish a passively safe and environmentally secure configuration at the PUREX facility and to preserve that condition for 10 years. The ten year time frame represents the typical duration expended to define, authorize and initiate follow-on decommissioning and decontamination activities.

  18. MELCOR assessment at SNL

    SciTech Connect (OSTI)

    Kmetyk, L. N.

    1992-01-01T23:59:59.000Z

    MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants, being developed at Sandia National Laboratories for the US Nuclear Regulatory Commission (USNRC). The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal/hydraulic response, core heatup, degradation and relocation, and fission product release and transport, is treated in MELCOR in a unified framework for both boiling water reactors (BWRS) and pressurized water reactors (PWRs). The MELCOR computer code has been developed to the point that it is now being successfully applied in severe accident analyses, particularly in probabilistic risk assessment (PRA) studies. MELCOR was the first of the severe accident analysis codes to undergo a formal peer review process. One of the major conclusions of the recent MELCOR Peer Review was the need for a more comprehensive and more systematic program of MELCOR assessment. A systematic program of code assessment provides a number of benefits, including: 1. guidance to the code developers in identification of areas where code improvements are needed (such as coding implementation errors in models, inappropriate or deficient models, missing models, excessive numerical sensitivities), 2. documented evidence to external observers, users, reviewers and project management that the code is modelling required phenomena correctly, and 3. increased general public acceptance that the code adequately treats issues related to public safety concerns.

  19. Life cycle assessment

    SciTech Connect (OSTI)

    Curran, M.A. [Environmental Protection Agency, Cincinnati, OH (United States)

    1994-12-31T23:59:59.000Z

    Life-Cycle Assessment (LCA) is a technical, data-based and holistic approach to define and subsequently reduce the environmental burdens associated with a product, process, or activity by identifying and quantifying energy and material usage and waste discharges, assessing the impact of those wastes on the environment, and evaluating and implementing opportunities to effect environmental improvements. The assessment includes the entire life-cycle of the product, process or activity encompassing extraction and processing of raw materials, manufacturing, transportation and distribution, use/reuse, recycling and final disposal. LCA is a useful tool for evaluating the environmental consequences of a product, process, or activity, however, current applications of LCA have not been performed in consistent or easily understood ways. This inconsistency has caused increased criticism of LCA. The EPA recognized the need to develop an LCA framework which could be used to provide consistent use across the board. Also, additional research is needed to enhance the understanding about the steps in the performance of an LCA and its appropriate usage. This paper will present the research activities of the EPA leading toward the development of an acceptable method for conducting LCA`s. This research has resulted in the development of two guidance manuals. The first manual is intended to be a practical guide to conducting and interpreting the life-cycle inventory. A nine-step approach to performing a comprehensive inventory is presented along with the general issues to be addressed. The second manual addresses life-cycle design.

  20. ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/

    E-Print Network [OSTI]

    ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS Area and Regulatory Amendments for Bering Sea Habitat Conservation May 2008 Lead Agency: National Juneau, AK 99802 (907) 586-7228 Abstract: This Environmental Assessment/Regulatory Impact Review

  1. Uncertainties in energy technology assessments

    E-Print Network [OSTI]

    Coate, David

    1980-01-01T23:59:59.000Z

    In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

  2. Dual Rater Competency Assessment FAQ

    Broader source: Energy.gov [DOE]

    The purpose of the dual rater competency assessment is to provide a clearer picture of the individual’s developmental needs by combining self-assessment and supervisory input. Together, these two...

  3. Geologic technical assessment of the Richton salt dome, Mississippi, for potential expansion of the U.S. strategic petroleum reserve.

    SciTech Connect (OSTI)

    Snider, Anna C.; Rautman, Christopher Arthur; Looff, Karl M. (Geologic Consultant)

    2006-01-01T23:59:59.000Z

    Technical assessment and remodeling of existing data indicates that the Richton salt dome, located in southeastern Mississippi, appears to be a suitable site for expansion of the U.S. Strategic Petroleum Reserve. The maximum area of salt is approximately 7 square miles, at a subsurface elevation of about -2000 ft, near the top of the salt stock. Approximately 5.8 square miles of this appears suitable for cavern development, because of restrictions imposed by modeled shallow salt overhang along several sides of the dome. The detailed geometry of the overhang currently is only poorly understood. However, the large areal extent of the Richton salt mass suggests that significant design flexibility exists for a 160-million-barrel storage facility consisting of 16 ten-million-barrel caverns. The dome itself is prominently elongated from northwest to southeast. The salt stock appears to consist of two major spine features, separated by a likely boundary shear zone trending from southwest to northeast. The dome decreases in areal extent with depth, because of salt flanks that appear to dip inward at 70-80 degrees. Caprock is present at depths as shallow as 274 ft, and the shallowest salt is documented at -425 ft. A large number of existing two-dimensional seismic profiles have been acquired crossing, and in the vicinity of, the Richton salt dome. At least selected seismic profiles should be acquired, examined, potentially reprocessed, and interpreted in an effort to understand the limitations imposed by the apparent salt overhang, should the Richton site be selected for actual expansion of the Reserve.

  4. Sandia Energy - SCADA Vulnerability Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SCADA Vulnerability Assessments Home Stationary Power Safety, Security & Resilience of Energy Infrastructure Grid Modernization Cyber Security for Electric Infrastructure National...

  5. ORISE: Radiological program assessment services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental monitoring programs Operational environments Decontamination and decommissioning projects Compliance assessments Radiological release programs ORISE is actively...

  6. DOE limited standard: Operations assessments

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

  7. Assessor Training NVLAP Assessment Forms

    E-Print Network [OSTI]

    NVLAP Assessor Training NVLAP Assessment Forms #12;Assessor Training 2009: NVLAP Assessment Forms 2 Summary ·Test Method Review Summary ·ProgramSpecific Checklists Examples #12;Assessor Training 2009: NVLAP are completed · Assessor Names, Dates, Lab Code #12;Assessor Training 2009: NVLAP Assessment Forms 4 NIST

  8. Assessment of Demand Response Resource

    E-Print Network [OSTI]

    Assessment of Demand Response Resource Potentials for PGE and Pacific Power Prepared for: Portland January 15, 2004 K:\\Projects\\2003-53 (PGE,PC) Assess Demand Response\\Report\\Revised Report_011504.doc #12;#12;quantec Assessment of Demand Response Resource Potentials for I-1 PGE and Pacific Power I. Introduction

  9. "" EPAT# Risk Assessments Environmental Impact

    E-Print Network [OSTI]

    "" EPAT# Risk Assessments Appendixes Environmental Impact Statement NESHAPS for Radionuclides for Hazardous Air Pollutants Risk Assessments Environmental Impact Statement for NESHAPS Radionuclides VOLUME 2 for Hazardous Air Pollutants EPA 520.1'1.-89-006,-2 Risk Assessments Environmental Impact Statement for NESHAPS

  10. NARSTO OZONE ASSESSMENT EXECUTIVE SUMMARY

    E-Print Network [OSTI]

    vi NARSTO OZONE ASSESSMENT EXECUTIVE SUMMARY Prepared as a NARSTO initiative, this tropospheric O3 in the accompanying Textbox, the NARSTO Ozone Assessment contains two product components. The first of these is a set aspects of tropospheric ozone pollution. The second component, the NARSTO Ozone Assessment Document

  11. A framework for combining social impact assessment and risk assessment

    SciTech Connect (OSTI)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany) [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany)] [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany)] [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)] [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15T23:59:59.000Z

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: • A hybrid model to combine SIA and SRA namely RSIA is proposed. • RSIA can provide the proper mechanism to assess social impacts of natural hazards. • RSIA can play the role of ex-post as well as ex-ante assessment. • For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  12. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    SciTech Connect (OSTI)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01T23:59:59.000Z

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  13. Integrated Assessment Modeling

    SciTech Connect (OSTI)

    Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

    2012-10-31T23:59:59.000Z

    This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

  14. Sandia Energy - Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements RecentlyElectronicResourcesjobsJulyCatalystsMolten-SaltAssessment Program

  15. Assessing Pathways in Aruba

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platform is alwaysISOSource Heat 1PowerofSystems |As Electric2: Assessing

  16. Wind Resource Assessment in Europe Using Emergy

    E-Print Network [OSTI]

    Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

    2014-01-01T23:59:59.000Z

    energy in Vietnam: Resource assessment, development statusWind Resource Assessment in Europe Using Emergy Subodhspeed). Keywords: Wind resource assessment; Emergy Analysis;

  17. Sandia Energy - Risk and Safety Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk and Safety Assessment Home Stationary Power Nuclear Fuel Cycle Nuclear Energy Safety Technologies Risk and Safety Assessment Risk and Safety AssessmentTara...

  18. Perceptual quality assessment for compressed video

    E-Print Network [OSTI]

    Yang, Kai-Chieh

    2007-01-01T23:59:59.000Z

    Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

  19. Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory

    SciTech Connect (OSTI)

    Gallegos, G; Daniels, J; Wegrecki, A

    2007-10-01T23:59:59.000Z

    This document contains the human health and ecological risk assessment for the Resource Recovery and Conservation Act (RCRA) permit renewal for the Explosives Waste Treatment Facility (EWTF). Volume 1 is the text of the risk assessment, and Volume 2 (provided on a compact disc) is the supporting modeling data. The EWTF is operated by the Lawrence Livermore National Laboratory (LLNL) at Site 300, which is located in the foothills between the cities of Livermore and Tracy, approximately 17 miles east of Livermore and 8 miles southwest of Tracy. Figure 1 is a map of the San Francisco Bay Area, showing the location of Site 300 and other points of reference. One of the principal activities of Site 300 is to test what are known as 'high explosives' for nuclear weapons. These are the highly energetic materials that provide the force to drive fissionable material to criticality. LLNL scientists develop and test the explosives and the integrated non-nuclear components in support of the United States nuclear stockpile stewardship program as well as in support of conventional weapons and the aircraft, mining, oil exploration, and construction industries. Many Site 300 facilities are used in support of high explosives research. Some facilities are used in the chemical formulation of explosives; others are locations where explosive charges are mechanically pressed; others are locations where the materials are inspected radiographically for such defects as cracks and voids. Finally, some facilities are locations where the machined charges are assembled before they are sent to the onsite test firing facilities, and additional facilities are locations where materials are stored. Wastes generated from high-explosives research are treated by open burning (OB) and open detonation (OD). OB and OD treatments are necessary because they are the safest methods for treating explosives wastes generated at these facilities, and they eliminate the requirement for further handling and transportation that would be required if the wastes were treated off site.

  20. REVIEWING PERFORMANCE ASSESSMENTS SUPPORTING

    E-Print Network [OSTI]

    Robert J. Lewis

    2010-01-01T23:59:59.000Z

    Purpose: To summarize current NRC policy and guidance, which should assist in making informed decisions regarding land disposal of unique low-level radioactive waste streams, including disposal of significant quantities of depleted uranium until a new regulation is implemented. Background: In September 2009, NRC staff conducted two public workshops soliciting early public input on major issues associated with a potential rulemaking for land disposal of unique waste streams including, but not limited to, significant quantities of depleted uranium. During these workshops, a number of stakeholders expressed interest or concern with the review of performance assessments supporting land disposal of unique waste streams prior to completion of the rulemaking process. Discussion: The enclosure contains a summary of existing guidance for reviewing performance assessments with a focus on issues associated with the safe disposal of unique waste streams. NRC staff is providing this guidance to the Agreement States for their information, and for distribution to their licensees, as appropriate. If you have any questions regarding this correspondence, please contact me at 301-415-3340 or the individuals named below.

  1. NATURAL RESOURCES ASSESSMENT

    SciTech Connect (OSTI)

    D.F. Fenster

    2000-12-11T23:59:59.000Z

    The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

  2. Airborne Particulate Threat Assessment

    SciTech Connect (OSTI)

    Patrick Treado; Oksana Klueva; Jeffrey Beckstead

    2008-12-31T23:59:59.000Z

    Aerosol threat detection requires the ability to discern between threat agents and ambient background particulate matter (PM) encountered in the environment. To date, Raman imaging technology has been demonstrated as an effective strategy for the assessment of threat agents in the presence of specific, complex backgrounds. Expanding our understanding of the composition of ambient particulate matter background will improve the overall performance of Raman Chemical Imaging (RCI) detection strategies for the autonomous detection of airborne chemical and biological hazards. Improving RCI detection performance is strategic due to its potential to become a widely exploited detection approach by several U.S. government agencies. To improve the understanding of the ambient PM background with subsequent improvement in Raman threat detection capability, ChemImage undertook the Airborne Particulate Threat Assessment (APTA) Project in 2005-2008 through a collaborative effort with the National Energy Technology Laboratory (NETL), under cooperative agreement number DE-FC26-05NT42594. During Phase 1 of the program, a novel PM classification based on molecular composition was developed based on a comprehensive review of the scientific literature. In addition, testing protocols were developed for ambient PM characterization. A signature database was developed based on a variety of microanalytical techniques, including scanning electron microscopy, FT-IR microspectroscopy, optical microscopy, fluorescence and Raman chemical imaging techniques. An automated particle integrated collector and detector (APICD) prototype was developed for automated collection, deposition and detection of biothreat agents in background PM. During Phase 2 of the program, ChemImage continued to refine the understanding of ambient background composition. Additionally, ChemImage enhanced the APICD to provide improved autonomy, sensitivity and specificity. Deliverables included a Final Report detailing our findings and APICD Gen II subsystems for automated collection, deposition and detection of ambient particulate matter. Key findings from the APTA Program include: Ambient biological PM taxonomy; Demonstration of key subsystems needed for autonomous bioaerosol detection; System design; Efficient electrostatic collection; Automated bioagent recognition; Raman analysis performance validating Td<9 sec; Efficient collection surface regeneration; and Development of a quantitative bioaerosol defection model. The objective of the APTA program was to advance the state of our knowledge of ambient background PM composition. Operation of an automated aerosol detection system was enhanced by a more accurate assessment of background variability, especially for sensitive and specific sensing strategies like Raman detection that are background-limited in performance. Based on this improved knowledge of background, the overall threat detection performance of Raman sensors was improved.

  3. assessment risk assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure 447 A 576-YEAR WEBER RIVER STREAMFLOW RECONSTRUCTION FROM TREE RINGS FOR WATER RESOURCE RISK ASSESSMENT IN THE WASATCH FRONT, UTAH1 Environmental Sciences and Ecology...

  4. assessment performance assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    set of 24 solid metals ... Csonka, Gabor I. 17 A consistent multi-user framework for assessing system performance CERN Preprints Summary: Agreeing suitability for purpose and...

  5. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. [Brookhaven National Lab., Upton, NY (United States); Anspaugh, L.; Layton, D. [Lawrence Livermore National Lab., CA (United States)

    1993-03-01T23:59:59.000Z

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  6. Community Readiness Assessments | Department of Energy

    Energy Savers [EERE]

    Community Readiness Assessments Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Community Readiness Assessments, Call Slides and...

  7. INEEL Source Water Assessment

    SciTech Connect (OSTI)

    Sehlke, Gerald

    2003-03-01T23:59:59.000Z

    The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL’s drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey’s Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency’s Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL’s Source Water Assessment. Of the INEEL’s 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL’s public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

  8. Cassini data assessment report

    SciTech Connect (OSTI)

    NONE

    1998-08-01T23:59:59.000Z

    On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

  9. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31T23:59:59.000Z

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  10. Pollutant Assessments Group Procedures Manual

    SciTech Connect (OSTI)

    Chavarria, D.E.; Davidson, J.R.; Espegren, M.L.; Kearl, P.M.; Knott, R.R.; Pierce, G.A.; Retolaza, C.D.; Smuin, D.R.; Wilson, M.J.; Witt, D.A. (Oak Ridge National Lab., TN (USA)); Conklin, N.G.; Egidi, P.V.; Ertel, D.B.; Foster, D.S.; Krall, B.J.; Meredith, R.L.; Rice, J.A.; Roemer, E.K. (Oak Ridge Associated Universities, Inc., TN (USA))

    1991-02-01T23:59:59.000Z

    This procedures manual combines the existing procedures for radiological and chemical assessment of hazardous wastes used by the Pollutant Assessments Group at the time of manuscript completion (October 1, 1990). These procedures will be revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy and support procedures. Format inconsistencies will be corrected in subsequent revisions of individual procedures.

  11. Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2003-03-13T23:59:59.000Z

    This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

  12. Assessment of the facilities on Jackass Flats and other Nevada Test Site facilities for the new nuclear rocket program

    SciTech Connect (OSTI)

    Chandler, G.; Collins, D.; Dye, K.; Eberhart, C.; Hynes, M.; Kovach, R.; Ortiz, R.; Perea, J.; Sherman, D.

    1992-12-01T23:59:59.000Z

    Recent NASA/DOE studies for the Space Exploration Initiative have demonstrated a critical need for the ground-based testing of nuclear rocket engines. Experience in the ROVER/NERVA Program, experience in the Nuclear Weapons Testing Program, and involvement in the new nuclear rocket program has motivated our detailed assessment of the facilities used for the ROVER/NERVA Program and other facilities located at the Nevada Test Site (NTS). The ROVER/NERVA facilities are located in the Nevada Research L, Development Area (NRDA) on Jackass Flats at NTS, approximately 85 miles northwest of Las Vegas. To guide our assessment of facilities for an engine testing program we have defined a program goal, scope, and process. To execute this program scope and process will require ten facilities. We considered the use of all relevant facilities at NTS including existing and new tunnels as well as the facilities at NRDA. Aside from the facilities located at remote sites and the inter-site transportation system, all of the required facilities are available at NRDA. In particular we have studied the refurbishment of E-MAD, ETS-1, R-MAD, and the interconnecting railroad. The total cost for such a refurbishment we estimate to be about $253M which includes additional contractor fees related to indirect, construction management, profit, contingency, and management reserves. This figure also includes the cost of the required NEPA, safety, and security documentation.

  13. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  14. Management and Independent Assessments Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-27T23:59:59.000Z

    The Guide reflects updated standards for assessment practices, international standards, and changes in DOE expectations related to quality assurance (QA). Cancels DOE G 414.1-1B.

  15. Environmental Assessment (Nova Scotia, Canada)

    Broader source: Energy.gov [DOE]

    Nova Scotia Environment conducts environmental assessments on projects and developments to ensure they adhere to the laws and regulations of the province. Developments required to undergo an...

  16. Industrial Process Heating - Technology Assessment

    Office of Environmental Management (EM)

    opportunities for technology improvements that can benefit from 146 high-performance computing (HPC) approaches. 147 148 In the next section, the technology assessment...

  17. An Impact Assessment Model for Distributed Adaptive Security Situation Assessment*

    E-Print Network [OSTI]

    California at Davis, University of

    1 An Impact Assessment Model for Distributed Adaptive Security Situation Assessment* Mark Heckman mechanism is not simply to stop attacks, but to protect a computing resource so that the resource can continue to perform its function. A computing resource, however, is only a component of a larger system

  18. Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary

    E-Print Network [OSTI]

    Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary Step 10 Name and programmes by which Forestry Commission Wales will help to deliver Woodlands for Wales ­ the Wales woodland of Demographic Equality Strands (2006) National Assembly for Wales · Forestry Commission survey of visitors

  19. SEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF

    E-Print Network [OSTI]

    Fay, Noah

    these concerns? Waste Water Treatment Facilities treat water to Waste Water Treatment Facilities treat water and disinfect anyy microorganisms that may be present The majority of Recycled water produced in ArizonaSEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF BIOLOGICAL VARIABILITY

  20. ENVIRONMENTAL ASSESSMENT OCEAN THERMAL ENERGY CONVERSION (OTEC) PILOT PLANTS

    E-Print Network [OSTI]

    Sullivan, S.M.

    2014-01-01T23:59:59.000Z

    winds. During E weather small craft anchor 0.5 mile offshoreOffshore of Bahia de Tallaboa a current of 0.5 knot has been observed setting :\\E across and against the E wind.winds, and 100 em sec (2 knot) surface currents. Living quarters will be provided in offshore

  1. Service Assessment Hurricane Floyd Floods

    E-Print Network [OSTI]

    Service Assessment Hurricane Floyd Floods of September 1999 mm r u, /"' r U.S.DEPARTMENTOF COMMERCE: Hurricane Floyd Floods of September 1999. Aerial view of Grifton, North Carolina, with flooding from the Neuse River. (Photograph courtesy of the U.S. Army Corps of Engineers.) #12;Service Assessment Hurricane

  2. , SdrviceAssessment Hurricane Katrina

    E-Print Network [OSTI]

    , SdrviceAssessment c . Hurricane Katrina August 23-31,2005 b U.S. DEPARTMENT OF COMMERCE National;Cover: NOAA-15 satellite image of HurricaneKatrina at 7:47 a.m. Central Daylight Time, August 29,2005,just east of New Orleans, Louisiana. #12;ServiceAssessment Hurricane Katrina August 23-31,2005 June

  3. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    @cofc.edu Phone: 3-7163 Office address: Silcox Physical Education Center, Office 317 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean ­ School of Education, Health, and Human Performance; Dr. Sara Davis, Associate Dean for Accountability, Assessment

  4. Environmental Health and Safety Assessment

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Environmental Health and Safety Assessment Program Manual 7/15/2013 #12;Environmental Health/26/2013. The most recent version of this document is available electronically at: http://sp.ehs.cornell.edu/env/general-environmental-management/environmental.........................................................................................................................4 #12;Environmental Health and Safety Assessment Program Manual Approved by: (Barb English) Last

  5. Appendix C: Hazardous Property Assessment

    E-Print Network [OSTI]

    Siddharthan, Advaith

    Appendix C: Hazardous Property Assessment The aim of this appendix is to: · give advice on the hazards properties H1 to H14 identified in Annex III of the HWD; · provide assessment methods and threshold concentrations for the hazards; and · advise on which test methods should be considered

  6. Contract 98 Self-Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

  7. PERFORMANCE ASSESSMENT OF PID CONTROLLERS

    E-Print Network [OSTI]

    Marquez, Horacio J.

    PERFORMANCE ASSESSMENT OF PID CONTROLLERS W. Tan, H. J. Marquez, and T. Chen§ Abstract: Criteria based on disturbance rejection and system robustness are proposed to assess the performance of PID-loop or multi-loop. Key Words: PID Control; Tuning; Performance; Robustness; Structured Singular Value. 1

  8. Species for the screening assessment. Columbia River Comprehensive Impact Assessment

    SciTech Connect (OSTI)

    Becker, J.M.; Brandt, C.A.; Dauble, D.D.; Maughan, A.D.; O`Neil, T.K.

    1996-03-01T23:59:59.000Z

    Because of past nuclear production operations along the Columbia River, there is intense public and tribal interest in assessing any residual Hanford Site related contamination along the river from the Hanford Reach to the Pacific Ocean. The Columbia River Comprehensive Impact Assessment was proposed to address these concerns. The assessment of the Columbia River is being conducted in phases. The initial phase is a screening assessment of the risk, which addresses current environmental conditions for a range of potential uses. One component of the screening assessment estimates the risk from contaminants in the Columbia River to the environment. The objective of the ecological risk assessment is to determine whether contaminants from the Columbia River pose a significant threat to selected receptor species that exist in the river and riparian communities of the study area. This report (1) identifies the receptor species selected for the screening assessment of ecological risk and (2) describes the selection process. The species selection process consisted of two tiers. In Tier 1, a master species list was developed that included many plant and animal species known to occur in the aquatic and riparian systems of the Columbia River between Priest Rapids Dam and the Columbia River estuary. This master list was reduced to 368 species that occur in the study area (Priest Rapids Dam to McNary Dam). In Tier 2, the 181 Tier 1 species were qualitatively ranked based on a scoring of their potential exposure and sensitivity to contaminants using a conceptual exposure model for the study area.

  9. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  10. RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT

    SciTech Connect (OSTI)

    Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

    2012-03-31T23:59:59.000Z

    Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

  11. Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment

    E-Print Network [OSTI]

    Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    ignored in life cycle assessment (LCA). Some productionexplicit manner, while life cycle assessment (LCA) does notuse impacts in life cycle assessment. Int J LCA 11(5):363–

  12. IMPORTANCE OF SAFETY CULTURE ASSESSMENT

    SciTech Connect (OSTI)

    Spitalnik, J.

    2004-10-06T23:59:59.000Z

    Safety Management has lately been considered by some Nuclear Regulatory agencies as the tool on which to concentrate their efforts to implement modern regulation structures, because Safety Culture was said to be difficult to monitor. However, Safety Culture can be assessed and monitored even if it is problematical to make Safety Culture the object of regulation. This paper stresses the feasibility and importance of Safety Culture Assessment based on self-assessment applications performed in several nuclear organizations in Latin America. Reasons and ownership for assessing Safety Culture are discussed, and relevant aspects considered for setting up and programming such an assessment are shown. Basic principles that were taken into account, as well as financial and human resources used in actual self-assessments are reviewed, including the importance of adequate statistical analyses and the necessity of proper feed-back of results. The setting up of action plans to enhance Safety Culture is the final step of the assessment program that once implemented will enable to establish a Safety Culture monitoring process within the organization.

  13. Criteria for assessing the quality of nuclear probabilistic risk assessments

    E-Print Network [OSTI]

    Zhu, Yingli, 1976-

    2004-01-01T23:59:59.000Z

    The final outcome of a nuclear Probabilistic Risk Assessment (PRA) is generally inaccurate and imprecise. This is primarily because not all risk contributors are addressed in the analysis, and there are state-of-knowledge ...

  14. System Assessment Standards: Defining the Market for Assessment Services

    E-Print Network [OSTI]

    McKane, A. T.; Sheaffer, P. E.

    2008-01-01T23:59:59.000Z

    potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems...

  15. ASSESSMENT POLICY and PRACTICE University of Strathclyde

    E-Print Network [OSTI]

    Azzopardi, Leif

    , the bulk of this section is the presentation of Twelve Principles of Good Assessment Practice in relation ASSESSMENT POLICY and PRACTICE Twelve Principles of Good Assessment Practice Assessment practice has been- 1 - ASSESSMENT POLICY and PRACTICE University of Strathclyde Introduction This document presents

  16. TMCC WIND RESOURCE ASSESSMENT

    SciTech Connect (OSTI)

    Turtle Mountain Community College

    2003-12-30T23:59:59.000Z

    North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

  17. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  18. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  19. Fort Carson Wind Resource Assessment

    SciTech Connect (OSTI)

    Robichaud, R.

    2012-10-01T23:59:59.000Z

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  20. SRR Rangeland Ecosystem Services Assessment

    E-Print Network [OSTI]

    Wyoming, University of

    derived from rangelands Link between the biophysical world and the social systems humans use Basic Fish Huntable or Catchable fish and wildlife Biofuels Fiber Biochemicals Genetic material #12 Assess biological, hydrological, atmospheric, and other physical resources (supply) Describe the market

  1. Utility View of Risk Assessment

    E-Print Network [OSTI]

    Bickham, J.

    This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

  2. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  3. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  4. Renewable Energy Property Tax Assessment

    Broader source: Energy.gov [DOE]

    Photovoltaic (PV) and wind energy facilities with a capacity of 2 megawatts (MW) AC or less are assessed locally for property taxes. Additionally, low impact hydro, geothermal, and biomass facili...

  5. Carbon Park Environmental Impact Assessment

    E-Print Network [OSTI]

    of offsetting the University's carbon footprint, promoting biodiversity and establishing easily maintained Carbon Park Environmental Impact Assessment A B.E.S.T. Project By, Adam Bond 2011 #12; Bishop's University Carbon Park

  6. University of Saskatchewan Sustainability Assessment

    E-Print Network [OSTI]

    Peak, Derek

    · Management for Sustainability · Energy · Transportation · Waste #12;Executive Summary Page 2 of 90 UUniversity of Saskatchewan Sustainability Assessment Prepared by: Kerri Klein Sustainable, Micheal Molaro and Jennifer Menzies) for their confidence in the vision of a sustainable University

  7. ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS

    E-Print Network [OSTI]

    Masanet, Eric

    2010-01-01T23:59:59.000Z

    method known as life?cycle assessment  (LCA), which is a Input?Output Life Cycle Assessment (EIO? LCA) model.  Input?Output Life?Cycle  Assessment (EIO?LCA) model (

  8. Life-cycle Assessment of Semiconductors

    E-Print Network [OSTI]

    Boyd, Sarah B.

    2009-01-01T23:59:59.000Z

    yield. A hybrid life cycle assessment (LCA) model is used;more accurate life-cycle assessment (LCA) of electronicthe purposes of life-cycle assessment (LCA). While it may be

  9. Viability Assessment Volume 4

    SciTech Connect (OSTI)

    DOE

    1998-12-01T23:59:59.000Z

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  10. Transboundary aquifers: Southwestern states assess 

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 14 Southwestern states assess Researchers from three universities in Texas, New Mexico, and Arizona and from the U.S. Geological Survey (USGS) are partnering on a new project to evaluate aquifers that span the United States... and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States...

  11. Guam Initial Technical Assessment Report

    SciTech Connect (OSTI)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01T23:59:59.000Z

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  12. NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop

    SciTech Connect (OSTI)

    Renne, D.

    2008-10-29T23:59:59.000Z

    Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

  13. Ecosystem Vulnerability Assessment - Patterns of Climate Change...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the Southwest Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the...

  14. NREL: International Activities - Biomass Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Biomass Resource Assessment Map showing annual productivity of marginal lands in APEC economies. Biomass resource assessments quantify the existing or potential biomass material in...

  15. Sandia National Laboratories: tidal energy resource assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    resource assessment Tidal Energy Resource Assessment in the East River Tidal Strait, New York On April 1, 2014, in Energy, News, News & Events, Partnership, Renewable Energy, Water...

  16. Colorado State University Industrial Assessment Center Saves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Assessment Center, inspects equipment at a manufacturing facility during an energy audit. | Photo courtesy of University of Missouri IAC. Industrial Assessment Centers...

  17. Innovative Exploration Techniques for Geothermal Assessment at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration...

  18. Technical Position, Regarding Acceptable Methods for Assessing...

    Office of Environmental Management (EM)

    Regarding Acceptable Methods for Assessing and Recording Radiation Doses to Individuals Technical Position, Regarding Acceptable Methods for Assessing and Recording Radiation Doses...

  19. EV Guideline Assessment Templates | Department of Energy

    Energy Savers [EERE]

    EV Guideline Assessment Templates More Documents & Publications EV Guideline Assessment Templates NDIAPMSCEVMSIntentGuideNov2006.pdf Earned Value Management System RM...

  20. Environmental Impact Statements and Environmental Assessments...

    Energy Savers [EERE]

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the...

  1. The Environmental Style: Writing Environmental Assessments and...

    Energy Savers [EERE]

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide...

  2. assessments: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

  3. Enterprise Assessments, Oak Ridge National Laboratory Irradiated...

    Energy Savers [EERE]

    and Health Assessments conducted an independent assessment of the safety-significant ventilation systems at the Oak Ridge National Laboratory (ORNL) Irradiated Fuels...

  4. Verification and Validation of Facilities Procedures Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Verification and Validation of Facilities Procedures Assessment Plan NNSANevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is...

  5. Tribal Renewable Energy Foundational Course: Assessing Energy...

    Office of Environmental Management (EM)

    Assessing Energy Needs and Resources Tribal Renewable Energy Foundational Course: Assessing Energy Needs and Resources Watch the U.S. Department of Energy Office of Indian Energy...

  6. Federal Radiological Monitoring and Assessment Center | National...

    National Nuclear Security Administration (NNSA)

    Mission The mission of the FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment Federal Radiological Monitoring and Assessment...

  7. Environmental Assessments (EA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    February 12, 2015 EA-1976D: Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida February 10, 2015 EA-2002: Final Environmental Assessment...

  8. UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis

    E-Print Network [OSTI]

    Yamamoto, Keith

    UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis Final Issue Date: March 21, 2010 #12;Carbon Footprint Analysis Background This chapter of the Sustainability Assessment focuses on UCSF

  9. Climate VISION: Resources and Links - Plant Assessments

    Office of Scientific and Technical Information (OSTI)

    of industrial manufacturing, are successful and commercially proven. Energy Productivity and Waste Assessments (Industrial Assessment Centers) If you run a small- to...

  10. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the...

  11. Environmental Impact Assessment (New Brunswick, Canada)

    Broader source: Energy.gov [DOE]

    Environmental Impact Assessment (EIA) is a process through which the environmental impacts potentially resulting from a proposed project are identified and assessed early in the planning process....

  12. assessing health impacts: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commission Equality Impact Assessment Forestry Commission Equality Impact Assessment Renewable Energy Websites Summary: Forestry Commission Equality Impact Assessment Forestry...

  13. Final Environmental Assessment, Burleigh County Wind Energy Center

    Broader source: Energy.gov (indexed) [DOE]

    Assessment Environmental Assessment Environmental Assessment Burleigh County Wind Energy Center Burleigh County, North Dakota Final Burleigh County Wind, LLC BASIN...

  14. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  15. Assessing the local windfield with instrumentation

    SciTech Connect (OSTI)

    Zambrano, T.G.

    1980-10-01T23:59:59.000Z

    This report concerns the development and testing of a technique for the initial screening and evaluation of potential sites for wind-energy conversion systems (WECS). The methodology was developed through a realistic siting exercise. The siting exercise involved measurements of winds along the surface and winds aloft using a relatively new instrument system, the Tethered Aerodynamic Lifting Anemometer (TALA) kite; notation of ecological factors such as vegetation flagging, soil erosion and site exposure, and verification of an area best suited for wind-energy development by establishing and maintaining a wind monitoring network. The siting exercise was carried out in an approximately 100-square-mile region of the Tehachapi Mountains of Southern California. The results showed that a comprehensive site survey involving field measurements, ecological survey, and wind-monitoring can be an effective tool for preliminary evaluation of WECS sites.

  16. Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment

    E-Print Network [OSTI]

    Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment U.S. Environmental Protection Agency ­ Region 10 Greg, WA Ann Williamson and Mike Cox, EPA Region 10 Office of Environmental Assessment, will be presenting

  17. Topaz II preliminary safety assessment

    SciTech Connect (OSTI)

    Marshall, A.C. (Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, New Mexico 87110 (United States)); Voss, S.S. (Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)); Haskin, E. (Department of Chemical and Nuclear Engineering Department, Institute for Nuclear Power Studies, University of New Mexico, Albuquerque, New Mexico 87110 (United States))

    1993-01-10T23:59:59.000Z

    The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz II space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safety assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the U.S. with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

  18. Topaz II preliminary safety assessment

    SciTech Connect (OSTI)

    Marshall, A.C. (Sandia National Labs., Albuquerque, NM (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, NM (United States)); Voss, S.S. (Los Alamos National Lab., NM (United States)); Haskin, E. (New Mexico Univ., Albuquerque, NM (United States). Dept. of Chemical and Nuclear Engineering)

    1992-01-01T23:59:59.000Z

    The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz 11 space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safely assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the US with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

  19. Membrane-Based Air Composition Control for Light-Duty Diesel Vehicles: A Benefit and Cost Assessment

    SciTech Connect (OSTI)

    K. Stork; R. Poola

    1998-10-01T23:59:59.000Z

    This report presents the methodologies and results of a study conducted by Argonne National Laboratory (Argonne) to assess the benefits and costs of several membrane-based technologies. The technologies evaluated will be used in automotive emissions-control and performance-enhancement systems incorporated into light-duty diesel vehicle engines. Such engines are among the technologies that are being considered to power vehicles developed under the government-industry Partnership for a New Generation of Vehicles (PNGV). Emissions of nitrogen oxides (NO{sub x}) from diesel engines have long been considered a barrier to use of diesels in urban areas. Recently, particulate matter (PM) emissions have also become an area of increased concern because of new regulations regarding emissions of particulate matter measuring 2.5 micrometers or less (PM{sub 2.5}). Particulates are of special concern for diesel engines in the PNGV program; the program has a research goal of 0.01 gram per mile (g/mi) of particulate matter emissions under the Federal Test Procedure (FTP) cycle. This extremely low level (one-fourth the level of the Tier II standard) could threaten the viability of using diesel engines as stand-alone powerplants or in hybrid-electric vehicles. The techniques analyzed in this study can reduce NO{sub x} and particulate emissions and even increase the power density of the diesel engines used in light-duty diesel vehicles.

  20. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  1. Assessing Energy Impact of Plug-In Hybrid Electric Vehicles: Significance of Daily Distance Variation over Time and Among Drivers

    SciTech Connect (OSTI)

    Lin, Zhenhong [ORNL; Greene, David L [ORNL

    2012-01-01T23:59:59.000Z

    Accurate assessment of the impact of plug-in hybrid electric vehicles (PHEVs) on petroleum and electricity consumption is a necessary step toward effective policies. Variations in daily vehicle miles traveled (VMT) over time and among drivers affect PHEV energy impact, but the significance is not well understood. This paper uses a graphical illustration, a mathematical derivation, and an empirical study to examine the cause and significance of such an effect. The first two methods reveal that ignoring daily variation in VMT always causes underestimation of petroleum consumption and overestimation of electricity consumption by PHEVs; both biases increase as the assumed PHEV charge-depleting (CD) range moves closer to the average daily VMT. The empirical analysis based on national travel survey data shows that the assumption of uniform daily VMT over time and among drivers causes nearly 68% underestimation of expected petroleum use and nearly 48% overestimation of expected electricity use by PHEVs with a 40-mi CD range (PHEV40s). Also for PHEV40s, consideration of daily variation in VMT over time but not among drivers similar to the way the utility factor curve is derived in SAE Standard SAE J2841 causes underestimation of expected petroleum use by more than 24% and overestimation of expected electricity use by about 17%. Underestimation of petroleum use and overestimation of electricity use increase with larger-battery PHEVs.

  2. Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document

    SciTech Connect (OSTI)

    NONE

    1997-02-04T23:59:59.000Z

    In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

  3. Risk assessment in environmental management

    SciTech Connect (OSTI)

    Asante-Duah, D.K.

    1998-07-01T23:59:59.000Z

    This book is a straightforward exposition of US EPA-based procedures for the risk assessment and risk management of contaminated land, interwoven with discussions on some of the key fundamentals on the fate and transport of chemicals in the environment and the toxic action of environmental chemicals. The book is logically structured, commencing with a general overview of the principles of risk assessment and the interface with environmental legislation. There follows an introduction to environmental fate and transport, modeling, toxicology and uncertainty analysis, and a discussion of the elements of a risk assessment (site characterization, exposure analysis, toxic action and risk characterization), intake of a chemical with its environmental concentration and activity-related parameters such as inhalation rate and exposure time. The book concludes with a discussion on the derivation of risk-based action levels and remediation goals.

  4. MELCOR technical assessment at SNL

    SciTech Connect (OSTI)

    Kmetyk, L.N.; Tautges, T.J.

    1993-12-01T23:59:59.000Z

    MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants, which is being developed at Sandia National Laboratories for the US Nuclear Regulatory Commission (US-NRC). The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal/hydraulic response, core heatup, degradation and relocation, and fission product release and transport, is treated in MELCOR in a unified framework for both boiling water reactors (PRWs). The MELCOR computer code has been developed to the point that is now being successfully applied in severe accident analyses, particularly in probabilistic risk assessment (PRA) studies. MELCOR was the first of the severe accident analysis code to undergo a formal peer review process. One of the major conclusions of the recent MELCOR Peer Review was the need for a more comprehensive and more systematic program of MELCOR assessment. This report provides a discussion of this technical assessment.

  5. Ion exchange technology assessment report

    SciTech Connect (OSTI)

    Duhn, E.F.

    1992-01-01T23:59:59.000Z

    In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW's. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

  6. Ion exchange technology assessment report

    SciTech Connect (OSTI)

    Duhn, E.F.

    1992-12-31T23:59:59.000Z

    In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

  7. Colorado Statewide Forest Resource Assessment and Strategy

    E-Print Network [OSTI]

    Colorado Statewide Forest Resource Assessment and Strategy www.csfs.colostate.edu Colorado Forest resource assessments had to be completed by June 2010 ­ required to receive S&PF funds in the future (2008;Resource Assessment and Strategy Partners Resource Assessment and Strategy Partners Colorado Division

  8. ASSESSMENT AND CONTROL OF OTEC ECOLOGICAL IMPACTS

    E-Print Network [OSTI]

    Wilde, P.

    2012-01-01T23:59:59.000Z

    Division of Solar Energy, Environmental and Resource1978. Solar Program Assessment: Environmental Factors -

  9. Assessment Update 2009 Prepared: July 27, 2009

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    1 Assessment Update 2009 Prepared: July 27, 2009 CHBE assessment activities during AY 2008 Thresholds Details of Assessment Activities Inputs Assessment Threshold Response Review The Faculty tightened) Safety in Senior Design Reports: I viewed the Coal Bed Methane Water Treatment Project and the Coal

  10. Perceptual quality assessment for compressed video

    E-Print Network [OSTI]

    Yang, Kai-Chieh

    2007-01-01T23:59:59.000Z

    5 Perceptual Temporal Quality Metric (Frame Interpolation Quality Metric . . . . . . . . . . . .Overview of Video Quality Assessment . . . . . . . . . . . .

  11. Assessing Uncertainty in Simulation Based Maritime Risk Assessment

    E-Print Network [OSTI]

    van Dorp, Johan René

    , such as nuclear powered vessels [6], vessels transporting liquefied natural gas [7] and offshore oil #12;2 and gas the decision-makers unsure whether the evidence was sufficient to assess specific risks and benefits. The first techniques to propagate uncertainty throughout the analysis. The conclusions drawn in the original study

  12. Integrated Environmental Assessment Part III: ExposureAssessment

    SciTech Connect (OSTI)

    McKone, Thomas E.; Small, Mitchell J.

    2006-06-01T23:59:59.000Z

    Human exposure assessment is a key step in estimating the environmental and public health burdens that result chemical emissions in the life cycle of an industrial product or service. This column presents the third in a series of overviews of the state of the art in integrated environmental assessment - earlier columns described emissions estimation (Frey and Small, 2003) and fate and transport modeling (Ramaswami, et al., 2004). When combined, these first two assessment elements provide estimates of ambient concentrations in the environment. Here we discuss how both models and measurements are used to translate ambient concentrations into metrics of human and ecological exposure, the necessary precursors to impact assessment. Exposure assessment is the process of measuring and/or modeling the magnitude, frequency and duration of contact between a potentially harmful agent and a target population, including the size and characteristics of that population (IPCS, 2001; Zartarian, et al., 2005). Ideally the exposure assessment process should characterize the sources, routes, pathways, and uncertainties in the assessment. Route of exposure refers to the way that an agent enters the receptor during an exposure event. Humans contact pollutants through three routes--inhalation, ingestion, and dermal uptake. Inhalation occurs in both outdoor environments and indoor environments where most people spend the majority of their time. Ingestion includes both water and food, as well as soil and dust uptake due to hand-to-mouth activity. Dermal uptake occurs through contacts with consumer products; indoor and outdoor surfaces; the water supply during washing or bathing; ambient surface waters during swimming or boating; soil during activities such as work, gardening, and play; and, to a lesser extent, from the air that surrounds us. An exposure pathway is the course that a pollutant takes from an ambient environmental medium (air, soil, water, biota, etc), to an exposure medium (indoor air, food, tap water, etc.) and to an exposed individual. Exposure scenarios are used to define plausible pathways for human contact. Recognition of the multiple pathways possible for exposure highlights the importance of a multimedia, multipathway exposure framework.

  13. A total risk assessment methodology for security assessment.

    SciTech Connect (OSTI)

    Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-06-01T23:59:59.000Z

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

  14. Geothermal resource assessment of Canon City, Colorado Area

    SciTech Connect (OSTI)

    Zacharakis, Ted G.; Pearl, Richard Howard

    1982-01-01T23:59:59.000Z

    In 1979 a program was initiated to fully define the geothermal conditions of an area east of Canon City, bounded by the mountains on the north and west, the Arkansas River on the south and Colorado Highway 115 on the east. Within this area are a number of thermal springs and wells in two distinct groups. The eastern group consists of 5 thermal artesian wells located within one mile of Colorado Highway 115 from Penrose on the north to the Arkansas river on the south. The western group, located in and adjacent to Canon City, consists of one thermal spring on the south bank of the Arkansas River on the west side of Canon City, a thermal well in the northeast corner of Canon City, another well along the banks of Four Mile Creek east of Canon City and a well north of Canon City on Four Mile Creek. All the thermal waters in the Canon City Embayment, of which the study area is part of, are found in the study area. The thermal waters unlike the cold ground waters of the Canon City Embayment, are a calcium-bicarbonate type and range in temperature from 79 F (26 C) to a high of 108 F (42 C). The total combined surface discharge o fall the thermal water in the study area is in excess of 532 acre feet (A.F.) per year.

  15. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    None

    2003-04-23T23:59:59.000Z

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as Attachment 1.

  16. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-05-01T23:59:59.000Z

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  17. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-08-01T23:59:59.000Z

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  18. Writing and Assessing Learning Outcomes

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Outcomes... Are student-focused Focus on learning resulting from an activity rather than the activity outcomes) to describing effectiveness (Learning outcomes) · Links Student Affairs and Academic Affairs; links curricular and co-curricular #12;Biggest challenges to assessing learning · Students do

  19. Integrated Disposal Facility Risk Assessment

    SciTech Connect (OSTI)

    MANN, F. M.

    2003-06-03T23:59:59.000Z

    An environmental risk assessment associated with the disposal of projected Immobilized Low-Activity Waste, solid wastes and failed or decommissioned melters in an Integrated Disposal Facility was performed. Based on the analyses all performance objectives associated with the groundwater, air, and intruder pathways were met.

  20. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    You. Date form Completed: 9/29/2011 Program Name and Type Physical Education Teacher Education@cofc.edu Phone: 3-8247 Office address: Silcox Physical Education Center, Office 312 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean ­ School

  1. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    You. Date form Completed: 9/29/2011 Program Name and Type Physical Education and Health, Health. Sue Balinsky Email: balinskys@cofc.edu Phone: 3-8242 Office address: Silcox Physical Education Center, Office 105 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr

  2. Hazards Survey and Hazards Assessments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

  3. Assessment Report Department of Economics

    E-Print Network [OSTI]

    Bogaerts, Steven

    1 Assessment Report Department of Economics August, 2012 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non- majors, about the methods, core theory. Relation to the University at Large Economics is an important part of a liberal arts education because

  4. Assessment Report Department of Economics

    E-Print Network [OSTI]

    Bogaerts, Steven

    1 Assessment Report Department of Economics September, 2009 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non-majors, about the methods, core theory discipline. Relation to the University at Large Economics is an important part of a liberal arts education

  5. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kasman, Alex

    College of Charleston Assessment Template Please copy completed form into Compliance Assist. Thank students for the fall of 2012. 3. Program Development: Survey students to determine the impact of program is preliminary ­ official enrollment will be determined in October of 2012. We plan to survey 2011 Senior Project

  6. Information Technology Security Assessment Framework

    E-Print Network [OSTI]

    Federal Information Technology Security Assessment Framework November 28, 2000 Prepared (NIST) Computer Security Division #12;Overview Information and the systems that process it are among and maintain a program to adequately secure its information and system assets. Agency programs must: 1) assure

  7. Mental Health Clinic Intake Assessment

    E-Print Network [OSTI]

    Weiblen, George D

    Mental Health Clinic Intake Assessment Welcome to the Mental Health Clinic at Boynton Health Clinic. The Medical Social Worker can provide you with resources if you require an evaluation-- 612 Clinic utilizes a short-term model of psychotherapy. This means that we are able to offer eleven

  8. Assessment Plans College of Nursing

    E-Print Network [OSTI]

    Dyer, Bill

    . Identify clinical and cost outcomes that improve safety, effectiveness, timeliness, efficiency, quality 2014 Y Y Y #12;Doctor of Nursing Practice Degree (DNP) Program Learning Outcomes a. Produce a scholarly and defenses c. A statement on the assessment of the DNP degree program indicating if the program outcomes

  9. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01T23:59:59.000Z

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  10. WESTERN WATER ASSESSMENT WHITE PAPER

    E-Print Network [OSTI]

    Neff, Jason

    the socio-economic effects of drought. Strategic Goals Following the findings and recommendations from two (outside of agriculture) · Few "disaster" declarations · Not even a unified roster of drought eventsWESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

  11. CRAD, Configuration Management Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

  12. Near Shore Submerged Oil Assessment

    E-Print Network [OSTI]

    Near Shore Submerged Oil Assessment September 2010 In the context of the BP Deepwater Horizon (DWH) oil spill in the Gulf of Mexico, submerged oil refers to near shore oil which has picked up sediments from very different physical and chemical processes. In this spill, the oil was released more than 5

  13. The social fabric of Jeans' Assessing the Social: Coupling social simulation and assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    . For instance, Life Cycle Assessment (LCA) (Guinée, 2002) focuses more on the embedded resources consumption many are not intended as major forms of assessment. Physical assessment (e.g. Life Cycle Assessment (LCA)), monetary assessment (e.g. Cost Benefit Analysis (CBA)), scenario analysis (tools

  14. assess pozzolanic activity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: 1 UNIVERSITY OF IDAHO STUDENT PROGRAMS ASSESSMENT Program Review and Assessment Activities......

  15. A Framework for Comparative Assessments of Energy Efficiency Policy Measures

    E-Print Network [OSTI]

    Blum, Helcio

    2012-01-01T23:59:59.000Z

    premise that the comparative assessment of energy efficiencypremise that the comparative assessment of energy efficiency

  16. Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperational Management »EnergyHubs |

  17. Assessment of the facilities on Jackass Flats and other Nevada test site facilities for the new nuclear rocket program

    SciTech Connect (OSTI)

    Chandler, G.; Collins, D.; Dye, K.; Eberhart, C.; Hynes, M.; Kovach, R.; Ortiz, R.; Perea, J.; Sherman, D. (Field Test Division, Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States))

    1993-01-15T23:59:59.000Z

    Recent NASA/DOE studies for the Space Exploration Initiative have demonstrated a critical need for the ground-based testing of nuclear rocket engines. Experience in the ROVER/NERVA Program, experience in the Nuclear Weapons Testing Program, and involvement in the new nuclear rocket program has motivated our detailed assessment of the facilities used for the ROVER/NERVA Program and other facilities located at the Nevada Test Site (NTS). The ROVER/NERVA facilities are located in the Nevada Research Development Area (NRDA) on Jackass Flats at NTS, approximately 85 miles northwest of Las Vegas. To guide our assessment of facilities for an engine testing program we have defined a program goal, scope, and process. In particular we have assumed that the program goal will be to certify a full engine system design as flight test ready. All nuclear and non-nuclear components will be individually certified as ready for such a test at sites remote from the NRDA facilities, the components transported to NRDA, and the engine assembled. We also assume that engines of 25,000--100,000 lb thrust levels will be tested with burn times of 1 hour or longer. After a test, the engine will be disassembled, time critical inspections will be executed, and a selection of components will be transported to remote inspection sites. The majority of the components will be stored for future inspection at Jackass Flats. To execute this program scope and process will require ten facilities. We considered the use of all relevant facilities at NTS including existing and new tunnels as well as the facilities at NRDA. Aside from the facilities located at remote sites and the inter-site transportation system, all of the required facilities are available at NRDA. In particular we have studied the refurbishment of E-MAD, ETS-1, R-MAD, and the interconnecting railroad.

  18. Transboundary aquifers: Southwestern states assess

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States... heavily on groundwater in aquifers. Municipal and other water users are increasing their use of groundwater, raising concerns about the long-term quality and availability of this supply, Michelsen said. ?Groundwater is the major and, in many areas...

  19. Preliminary melter performance assessment report

    SciTech Connect (OSTI)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01T23:59:59.000Z

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

  20. RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP

    Broader source: Energy.gov [DOE]

    The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

  1. Performance Assessment Report Domain CHP System

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    Performance Assessment Report for the Domain CHP System November 2005 By Burns & McDonnell Engineering #12;Domain CHP System Performance Assessment Report for the Packaged Cooling, Heating and Power

  2. HAS TECHNOLOGY ASSESSMENT KEPT PACE WITH GLOBALIZATION?

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    HAS TECHNOLOGY ASSESSMENT KEPT PACE WITH GLOBALIZATION? bridges vol. 18, July 2008 / Pielke makers would benefit from an authoritative, independent perspective on technology assessment of renewable energy technologies; and the US Congress is considering implementing laws to regulate speculation

  3. Reliability Assessment Incorporating Operational Considerations and Economic

    E-Print Network [OSTI]

    PSERC Reliability Assessment Incorporating Operational Considerations and Economic Aspects Engineering Research Center Reliability Assessment Incorporating Operational Considerations and Economic and Economic Aspects for Large Interconnected Grids." We express our appreciation for the support provided

  4. Wind Resource Assessment in Europe Using Emergy

    E-Print Network [OSTI]

    Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

    2014-01-01T23:59:59.000Z

    of wind turbine assessment based on energy, exergy, LCA andLCA and emergy) in the case of sustainability assessment of windLCA does. In emergy analysis, direct and indirect inputs of wind

  5. Economic Assessment of the NIST Thermocouple Calibration

    E-Print Network [OSTI]

    97-1 Planning Report Economic Assessment of the NIST Thermocouple Calibration Program U of Standards and Technology #12;ECONOMIC ASSESSMENT OF THE NIST THERMOCOUPLE CALIBRATION PROGRAM July 11, 1997 ............................................................................................................... 4 1.2 NIST Thermocouple Calibration Program

  6. Probabilistic Wind Resource Assessment and Power Predictions

    E-Print Network [OSTI]

    Firestone, Jeremy

    Probabilistic Wind Resource Assessment and Power Predictions Luca Delle Monache (lucadm Accurate wind resource assessment and power forecasts and reliable quanXficaXon of their uncertainty Mo5va5on · Power forecast: o Increase wind energy penetra

  7. Australian Shale Gas Assessment Project Reza Rezaee

    E-Print Network [OSTI]

    , Access to different pore structure evaluation techniques including low pressure nitrogen adsorptionAustralian Shale Gas Assessment Project Reza Rezaee Unconventional Gas Research Group of natural gas in many countries. According to recent assessments, Australia has around 437 trillion cubic

  8. Assessment of Farmland Hosting Renewable Energy Systems

    Broader source: Energy.gov [DOE]

    In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower...

  9. Local Option- Property Assessed Clean Energy

    Broader source: Energy.gov [DOE]

    Property-Assessed Clean Energy (PACE) financing effectively allows property owners to borrow money to pay for energy improvements. The amount borrowed is typically repaid via a special assessment...

  10. UK Climate Change Risk Assessment and National

    E-Print Network [OSTI]

    Wirosoetisno, Djoko

    UK Climate Change Risk Assessment and National Adaptation Programme Meg Patel Defra #12 change #12;Weather & climate impacts - economic, societal, environmental Water consumption per capita;Legislative Framework Climate Change Act 2008 Adaptation Reporting Power 2011 Climate Change Risk Assessment

  11. Performance Assessment Community of Practice Technical Exchange

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interagency Performance and Risk Assessment Community of Practice The Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) was formed to provide a forum to...

  12. EPA`s risk assessment guidelines: Overview

    SciTech Connect (OSTI)

    Patton, D.E. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31T23:59:59.000Z

    The US Environmental Protection Agency (EPA) risk assessment guidelines for cancer, quantification, and exposure issues are discussed.

  13. EM Performs Tenth Technology Readiness Assessment

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006.

  14. NASA Benchmarks Safety Functions Assessment plan - Developed...

    Broader source: Energy.gov (indexed) [DOE]

    SAFETY FUNCTIONS Assessment Plan Developed By NNSANevada Site Office Facility Representative Division Performance Objective: Management should be proactive in addressing...

  15. Office of Security Assessments | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information, personnel security, and foreign visits and assignments. Assesses the information security practices at facilities managing special access programs and...

  16. Articles about Resource Assessment and Characterization

    Broader source: Energy.gov [DOE]

    Stories about resource assessment and characterization featured by the U.S. Department of Energy (DOE) Wind Program.

  17. Sandia National Laboratories: Quantitative Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Materials & Components Compatibility Hydrogen Behavior Quantitative Risk Assessment Hydrogen Infrastructure Solar Thermochemical Hydrogen Production Market Transformation...

  18. Total System Performance Assessment Peer Review Panel

    Broader source: Energy.gov [DOE]

    Total System Performance Assessment (TSPA) Peer Review Panel for predicting the performance of a repository at Yucca Mountain.

  19. Enterprise Assessments Operational Awareness Record, Argonne...

    Office of Environmental Management (EM)

    Operational Awareness Record, Argonne National Laboratory and New Brunswick Laboratory - March 2015 Enterprise Assessments Operational Awareness Record, Argonne National Laboratory...

  20. Assessing Energy Resources Webinar Text Version

    Broader source: Energy.gov [DOE]

    Download the text version of the audio from the DOE Office of Indian Energy webinar on assessing energy resources.

  1. Risk assessment and toxicology databases for health effects assessment

    SciTech Connect (OSTI)

    Lu, P.Y.; Wassom, J.S. [Oak Ridge National Laboratory, TN (United States)

    1990-12-31T23:59:59.000Z

    Scientific and technological developments bring unprecedented stress to our environment. Society has to predict the results of potential health risks from technologically based actions that may have serious, far-reaching consequences. The potential for error in making such predictions or assessment is great and multiplies with the increasing size and complexity of the problem being studied. Because of this, the availability and use of reliable data is the key to any successful forecasting effort. Scientific research and development generate new data and information. Much of the scientific data being produced daily is stored in computers for subsequent analysis. This situation provides both an invaluable resource and an enormous challenge. With large amounts of government funds being devoted to health and environmental research programs and with maintenance of our living environment at stake, we must make maximum use of the resulting data to forecast and avert catastrophic effects. Along with the readily available. The most efficient means of obtaining the data necessary for assessing the health effects of chemicals is to utilize applications include the toxicology databases and information files developed at ORNL. To make most efficient use of the data/information that has already been prepared, attention and resources should be directed toward projects that meticulously evaluate the available data/information and create specialized peer-reviewed value-added databases. Such projects include the National Library of Medicine`s Hazardous Substances Data Bank, and the U.S. Air Force Installation Restoration Toxicology Guide. These and similar value-added toxicology databases were developed at ORNL and are being maintained and updated. These databases and supporting information files, as well as some data evaluation techniques are discussed in this paper with special focus on how they are used to assess potential health effects of environmental agents. 19 refs., 5 tabs.

  2. Quality assessment: A performance-based approach to assessments

    SciTech Connect (OSTI)

    Caplinger, W.H.; Greenlee, W.D.

    1993-08-01T23:59:59.000Z

    Revision C to US Department of Energy (DOE) Order 5700.6 (6C) ``Quality Assurance`` (QA) brings significant changes to the conduct of QA. The Westinghouse government-owned, contractor-operated (GOCO) sites have updated their quality assurance programs to the requirements and guidance of 6C, and are currently implementing necessary changes. In late 1992, a Westinghouse GOCO team led by the Waste Isolation Division (WID) conducted what is believed to be the first assessment of implementation of a quality assurance program founded on 6C.

  3. www.coe.ttu.edu 50-200 miles

    E-Print Network [OSTI]

    Gelfond, Michael

    % Petroleum Engineering 14% the whitacre college of engineering is one of the wall Street Journal's "top 25 and private companies, nonprofit organizations and federal agencies. The Wall Street Journal list identifies--areas that are growing, pay well and offer high levels of satisfaction. wall Street Journal Ranks texas tech in top 25

  4. HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND

    E-Print Network [OSTI]

    Fabrikant, J.I.

    2010-01-01T23:59:59.000Z

    of anv additional nuclear radiation, the 2,163,000 personsfor low-level radiation in the nuclear industry. However,be unrelated to the radiation from the nuclear power plant

  5. LOCATION Johnstone, Renfrewshire, a few miles west of Paisley.

    E-Print Network [OSTI]

    . The primary seven children (aged 10-11years) were given a series of sessions in Windyhill that helped bring. 2009 Tree safety work carried out on the existing path through the mature oak / birch woodland. Work with Auchenlodment Primary School continued with the Fantastic Forests project. 2010 £50,000 of funding for creating

  6. JACKSONVILLE HARBOR (MILE POINT) NAVIGATION STUDY DUVAL COUNTY, FLORIDA

    E-Print Network [OSTI]

    US Army Corps of Engineers

    /reconfiguration of the existing training wall, restoration of Great Marsh Island which is the least cost disposal option as beneficial use of dredged material to restore wetlands (incidental environmental benefits) up to 53 acres of the crosscurrents on the adjacent shoreline. The estimated total cost for the Recommended Plan, including associated

  7. Vehicle routing for the last mile of power system restoration

    SciTech Connect (OSTI)

    Bent, Russell W [Los Alamos National Laboratory; Coffrin, Carleton [Los Alamos National Laboratory; Van Hentenryck, Pascal [BROWN UNIV.

    2010-11-23T23:59:59.000Z

    This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

  8. HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND

    E-Print Network [OSTI]

    Fabrikant, J.I.

    2010-01-01T23:59:59.000Z

    radiation annually in Harrisburg, Pennsyl­ vania, andradia­ tion annually in Harrisburg, and equivalent to the

  9. A Stochastic Optimization Model for Designing Last Mile Relief ...

    E-Print Network [OSTI]

    Birbil

    2015-06-15T23:59:59.000Z

    Manufacturing Systems/Industrial Engineering Program, Sabanc? University, Istanbul, .... our knowledge, have not been considered in a stochastic setting before.

  10. TRIUMAH 2012 RESULTS FEMALES BY AGE * distance measured in miles

    E-Print Network [OSTI]

    Amin, S. Massoud

    .730 2.550 12.007 4049 Ridler Kris 1.273 7.360 3.340 11.973 4049 Jensen Rachel 0.258 7.630 3.630 11.606 6.920 1.960 9.486 4049 Reitz Melanie 0.424 6.520 2.250 9.194 4049 Johnson Lisa 0.652 6.220 2.030 8

  11. Compound and Elemental Analysis At Seven Mile Hole Area (Larson...

    Open Energy Info (EERE)

    Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Standard X-ray diffractometer (XRD) analyses were used in the...

  12. An internship in the agricultural chemical industry: Miles Inc.

    E-Print Network [OSTI]

    Adams, Sharla K

    1994-01-01T23:59:59.000Z

    in Arlington. They beat the Yankees 10 to 9. 6/8 CONTACTS: Dennis Horak, Mike McGinn (Boyce Gin, Waxahachie), Mrs. Roebuck (Roebuck Grain), Dwight Duncan (Avalon), Glenn Sheppard (Helena, Italy), Ted Moore (Williams Gin, Frost), Jerry George (Terra... Divin next week. 6/10 CONTACTS: Ronnie Smith (Terra, Waco), Estes Chemical (Waco), Terry Mechell (CVC, Elm Mott), T. M. Harper (Palmer) Barry Adams (Rocket). RE~S: Dropped off pheremone for Ronnie, met the guys at Estes, took Terry to lunch, put up 3...

  13. Full Useful Life (120,000 miles) Exhaust Emission Performance...

    Broader source: Energy.gov (indexed) [DOE]

    NOx adsorber desulfation) - Periodic unregulated emissions measurement with 15-ppm S refinery product - NOx adsorber desulfation performed on time based schedule Project divided...

  14. Management of 'Siratro' and 'Miles lotononis' in association with Kleingrass

    E-Print Network [OSTI]

    Siewerdt, Lotar

    1972-01-01T23:59:59.000Z

    were chemically fractionated into cell contents (NDE) and cell-wall constituents (NDF). The neutral detergent fiber (NDF) portion was subsequently partitioned into hemicellu- lose, cellulose, lignin and ash, according to current laboratory iv... procedures. Kleingrass was significantly higher than the legumes in NDF as well as NDF components, except for lignin. In vitro digestible dry matter (IVDDM) differed between grass and legumes, the latter being slightly more digestible. Cell wall digesti...

  15. Lost : 2,938 miles and 42 years away

    E-Print Network [OSTI]

    Oring, Sheryl

    2011-01-01T23:59:59.000Z

    and Port-au-Prince, Haiti. 42 years April 7, 1968 to Junes devastating earthquake in Haiti. While San Diego is 2,938that would deliver it to Haiti. At first, this was not meant

  16. Seven Mile Hill Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd JumpInformationScottsOklahoma: EnergySeoulSettlers Hill GasHills,Carbon

  17. Seven Mile Hole Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd JumpInformationScottsOklahoma: EnergySeoulSettlers Hill

  18. March 28, 1979: Three Mile Island | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas »ofMarketingSmartManufacturingMarch 10,Department of8,

  19. MHK Projects/Fortyeight Mile Point Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOf KilaueaInformationCygnet < MHKSound, NY ProjectAdams <

  20. MHK Projects/Twelve Mile Point Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, searchOfRose Bend < MHK Projects Jump to: navigation,Thames isTurnbull

  1. Salt Wells, Eight Mile Flat | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |Rippey Jump to:WY)Project Jump to: navigation, searchWells,

  2. Seven Mile Hole Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f < RAPID‎ |Rippey JumpAir JumpCaliforniaGroup LLCSettler's TrailSeven

  3. Innovative Cell Materials and Designs for 300 Mile Range EVs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking of BlytheDepartment ofEnergy Information forInjury andTransferInnovative

  4. Mile High: Order (2012-SE-4501) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment3311,Official FileEnergy Midsize Wind TurbinesWritten MildOrder

  5. Mile High: Proposed Penalty (2012-SE-4501) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment3311,Official FileEnergy Midsize Wind TurbinesWritten

  6. Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternative Fuels CleanReduceNew Hampshire Fleet

  7. Microsoft Word - 10_Million_Loaded_Miles.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA / USACE SWPA /9-1595:UFC 2300.003,826:UFCFor

  8. Innovative Cell Materials and Designs for 300 Mile Range EVs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet),EnergyImprovementINDIANManagement1, 2010|Innovative Cell Materials

  9. Innovative Cell Materials and Designs for 300 Mile Range EVs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(Fact Sheet),EnergyImprovementINDIANManagement1, 2010|Innovative Cell

  10. Pacific Northwest Power Supply Adequacy Assessment

    E-Print Network [OSTI]

    . Based on an assessment prepared by the Resource Adequacy Forum, the plan noted that relying only that this assessment is not a substitute for a comprehensive resource acquisition plan. The optimal amount and mixPacific Northwest Power Supply Adequacy Assessment for 2017 Final Report November 21, 2012 Council

  11. Pacific Northwest Power Supply Adequacy Assessment

    E-Print Network [OSTI]

    ), the LOLP rises to about 11 percent. The Council's adequacy assessment only counts existing resources and planned resources that are already sited and licensed for operation in the year assessed. There are other years that is not included in this assessment. #12;3 The Resource Adequacy Standard and What it Means

  12. QEP WORKING GROUP CHARGES Assessment Working Group

    E-Print Network [OSTI]

    Liu, Paul

    and a framework that details timelines, leadership, resource allocation, and an assessment plan that is clearlyQEP WORKING GROUP CHARGES Assessment Working Group The topic of the QEP should fit should be supported by a thorough understanding of the institutional context and by assessment data

  13. UW SCHOOL OF PHARMACY ASSESSMENT COMMITTEE

    E-Print Network [OSTI]

    Sheridan, Jennifer

    , staff Resource People Paul Hutson Emily Tarter For 2013-2014, the Assessment Committee is charged to: 1UW SCHOOL OF PHARMACY ASSESSMENT COMMITTEE 2013-2014 Committee Members Beth Martin (chair) Sarah/Toxicology Admissions/ Oversight Committees, complete the Programmatic Evaluation and Educational Assessment Plan prior

  14. Medical Surveillance n Based on risk assessment

    E-Print Network [OSTI]

    Collins, Gary S.

    Surveillance Risk Assessment 2.12 #12;n Top management n overall safety policy n resource allocation n2.12 #12;Medical Surveillance Criteria n Based on risk assessment n Pre-placement n evaluate of numbers exists n Predict an outcome given similar events Medical Surveillance Risk Assessment 2.12 #12;n

  15. STOCK ASSESSMENT PRINCIPLES AND TERMS appendix 4

    E-Print Network [OSTI]

    assessment is a report that often includes an estimation of the amount or abundance of the resource to determine what ac- tions are needed to promote the best use of our living marine resources. Stock assessment with commercial and recreational catch data to assess the resource base. The final critical data comes from

  16. Radiological assessment of dredging application for

    E-Print Network [OSTI]

    Radiological assessment of dredging application for Oldbury power station (2009) Cefas Environment 14 /2009 RADIOLOGICAL ASSESSMENT OF DREDGING APPLICATION FOR OLDBURY POWER STATION (2009) The Centre material disposal ­ Part II FEPA #12;2 RADIOLOGICAL ASSESSMENT OF DREDGING APPLICATION FOR OLDBURY POWER

  17. Radiological assessment of dredging application for

    E-Print Network [OSTI]

    Radiological assessment of dredging application for the port of Lancaster (2008) Cefas Environment 21/2008 RADIOLOGICAL ASSESSMENT OF DREDGING APPLICATION FOR THE PORT OF LANCASTER (2008) The Centre Marine material disposal ­ Part II FEPA #12;2 RADIOLOGICAL ASSESSMENT OF DREDGING APPLICATION

  18. UNIVERSITY OF IDAHO STUDENT/ PROGRAMS ASSESSMENT

    E-Print Network [OSTI]

    O'Laughlin, Jay

    for the Year 2005-06 Annual Report, 1/2005-6/2006 #12;2 TABLE OF CONTENTS I. Assessment in 2005-06 ......................................................................................................................................... 34 #12;1 ANNUAL ASSESSMENT REPORT, 2006 I. Assessment in 2005-06 Effective teaching and learning

  19. Assessment of University Sustainability Activities SUSTAINABILITY TRACKING,

    E-Print Network [OSTI]

    Dodla, Ramana

    Assessment of University Sustainability Activities under the SUSTAINABILITY TRACKING, ASSESSMENT Rashed-Ali, PhD. Prepared for: The UTSA Sustainability Council May 3rd , 2011 #12;yhd/s ^hDD Zz 2 | P a g-Ali, Assistant Professor in the College of Architecture, conducted a survey and assessment of UTSA sustainability

  20. Corral Monitoring System assessment results

    SciTech Connect (OSTI)

    Filby, E.E.; Haskel, K.J.

    1998-03-01T23:59:59.000Z

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  1. NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool

    E-Print Network [OSTI]

    NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool Air Quality Assessment Tool For Livestock Producers & Advisors #12;NAQSAT The National Air Quality Site Assessment Tool (NAQSAT) was developed for livestock producers and their advisors interested

  2. Assessment Design The unit coordinator is responsible for designing effective, efficient assessment tasks. There are

    E-Print Network [OSTI]

    2 Assessment Design The unit coordinator is responsible for designing effective, efficient influence student retention and study success if done effectively. Assessment load The number of summative task? What is the timing of assessment demands and due dates in relation to those for assessments

  3. Groundwater Data Package for Hanford Assessments

    SciTech Connect (OSTI)

    Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.; Freedman, Vicky L.

    2006-01-31T23:59:59.000Z

    This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management and Integration Project (#47043).

  4. Assessment of Residential GSHP System

    SciTech Connect (OSTI)

    Liu, Xiaobing [ORNL

    2010-09-01T23:59:59.000Z

    This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

  5. Biomass cogeneration. A business assessment

    SciTech Connect (OSTI)

    Skelton, J.C.

    1981-11-01T23:59:59.000Z

    This guide serves as an overview of the biomass cogeneration area and provides direction for more detailed analysis. The business assessment is based in part on discussions with key officials from firms that have adopted biomass cogeneration systems and from organizations such as utilities, state and federal agencies, and banks that would be directly involved in a biomass cogeneration project. The guide is organized into five chapters: biomass cogeneration systems, biomass cogeneration business considerations, biomass cogeneration economics, biomass cogeneration project planning, and case studies.

  6. Improving pandemic influenza risk assessment

    E-Print Network [OSTI]

    Russell, Colin A.; Kasson, Peter M.; Donis, Ruben O.; Riley, Steven; Dunbar, John; Rambaut, Andrew; Asher, Jason; Burke, Stephen; Davis, C. Todd; Garten, Rebecca J.; Gnanakaran, Sandrasegaram; Hay, Simon I.; Herfst, Sander; Lewis, Nicola S.; Lloyd-Smith, James O.; Macken, Catherine A.; Maurer-Stroh, Sebastian; Neuhaus, Elizabeth; Suarez, David L.; Trock, Susan C.; Widdowson, Marc-Alain; George, Dylan B.; Lipsitch, Marc; Bloom, Jesse D.

    2014-10-16T23:59:59.000Z

    to Critical Assessment of protein Structure Prediction (CASP) (Moult et al., 2011). In a CASP-like exercise, one or more experimental groups would generate quantita- tive phenotype data for a set of viruses, for exam- ple the relative binding of ?2... al. 2012. A long neglected world malaria map: Plasmodium vivax endemicity in 2010. PLOS Neglected Tropical Diseases 6:e1814. doi:10.1371/ journal.pntd.0001814. Gething PW, Patil AP, Smith DL, Guerra CA, Elyazar IR, Johnston GL, Tatem AJ, Hay SI...

  7. Assessment of government tribology programs

    SciTech Connect (OSTI)

    Peterson, M.B.; Levinson, T.M.

    1985-09-01T23:59:59.000Z

    An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

  8. Importance of life cycle assessment

    SciTech Connect (OSTI)

    Bridges, J.S.

    1994-06-16T23:59:59.000Z

    The paper presents Life Cycle Assessment (LCA) as a tool to assist the waste professional with integrated waste management. LCA can be the connection between the waste professional and designer/producer to permit the waste professional to encourage the design of products so material recovery is most efficient and markets can be better predicted. The waste professional can better monitor the involvement of the consumer in waste management by using LCA and looking upstream at how the consumer actually reacts to products and packaging. LCA can also help the waste professional better understand the waste stream.

  9. Sandia Energy - Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home Distribution GridDocumentsInstitute of AdvancedSecurity Risk Assessment

  10. Assess Oportunities | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrimArkansasAshford,Asotin County, Washington:AspenAssess

  11. assessing functional mitral: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Berkeley, University of 368 Environmental assessment of electricity scenarios with Life Cycle Assessment Physics Websites Summary: impacts assessment of scenarios is very...

  12. assessing phytochemical intake: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Berkeley, University of 342 Environmental assessment of electricity scenarios with Life Cycle Assessment Physics Websites Summary: impacts assessment of scenarios is very...

  13. EA-1663: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1663: Final Environmental Assessment BP Solar Array Project Brookhaven National Laboratory Upton, New York This Environmental Assessment (EA)...

  14. EA-1822: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Assessment EA-1822: Final Environmental Assessment Idaho National Laboratory Stand-Off Experiment (SOX) Range The objective of this environmental assessment...

  15. PG&E Reconductoring Project Biological Assessment (Revised) ...

    Broader source: Energy.gov (indexed) [DOE]

    PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (1216...

  16. Property-Assessed Clean Energy Programs | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Financing Financing Structures Property-Assessed Clean Energy Programs Property-Assessed Clean Energy Programs The property-assessed clean energy (PACE) model is an...

  17. Assessments of biofuel sustainability: air pollution and health impacts

    E-Print Network [OSTI]

    Tsao, Chi-Chung

    2012-01-01T23:59:59.000Z

    in Brazil through life- cycle assessment (LCA), and findin Brazil through life-cycle assessment (LCA), and findLCA inventory: How this affects Life Cycle impact Assessment.

  18. Geographically Differentiated Life-cycle Impact Assessment of Human Health

    E-Print Network [OSTI]

    Humbert, Sebastien

    2009-01-01T23:59:59.000Z

    indicators in life-cycle assessment (LCA). Human Ecologicalindicators in life-cycle assessment (LCA). Human EcologicalI explore how life-cycle assessment (LCA) results can

  19. Focus Series: Denver Energy Advisor Program Helps Homeowners Go the Extra Mile in Mile-High City

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport inEnergy0.pdf Flash2010-60.pdf2 DOE Hydrogen andMeeting Date: June

  20. Assessing the Security Vulnerabilities of Correctional Facilities

    SciTech Connect (OSTI)

    Morrison, G.S.; Spencer, D.S.

    1998-10-27T23:59:59.000Z

    The National Institute of Justice has tasked their Satellite Facility at Sandia National Laboratories and their Southeast Regional Technology Center in Charleston, South Carolina to devise new procedures and tools for helping correctional facilities to assess their security vulnerabilities. Thus, a team is visiting selected correctional facilities and performing vulnerability assessments. A vulnerability assessment helps to identi~ the easiest paths for inmate escape, for introduction of contraband such as drugs or weapons, for unexpected intrusion fi-om outside of the facility, and for the perpetration of violent acts on other inmates and correctional employees, In addition, the vulnerability assessment helps to quantify the security risks for the facility. From these initial assessments will come better procedures for performing vulnerability assessments in general at other correctional facilities, as well as the development of tools to assist with the performance of such vulnerability assessments.

  1. Assessment of HYGAS mechanical equipment

    SciTech Connect (OSTI)

    Albrecht, P.R.; Kramberger, F.E.; Recupero, R.M.; Verden, M.L.; Rees, K.

    1980-10-01T23:59:59.000Z

    The HYGAS process, which converts coal to substitute natural gas, is being developed by the Institute of Gas Technology (IGT) using an 80 ton per day pilot plant located in Chicago, Illinois. Plant design started in 1967 and testing began in October 1971. Since then, 18,000 tons of both Eastern and Western coal have been gasified. Assessment of the mechanical equipment was made by Mechanical Technology Incorporated (MTI) in collaboration with a DOE on-site representative and a representative from IGT, the operating contractor. Data for the assessment were obtained by reviewing all available maintenance records, by interviewing key personnel from maintenance and operations, and by observing repairs and maintenance procedures where possible. While operating the plant, a variety of equipment problems were addressed, many of which are generic to HYGAS as well as other coal conversion processes. Some problems were solved completely while others were solved to suit the limited needs of the pilot plant. Accordingly, the emphasis of this study is on the degree of success in dealing with equipment failures, the unresolved problems and the implication to future coal conversion plants.

  2. Fossil energy materials needs assessment

    SciTech Connect (OSTI)

    King, R.T.; Judkins, R.R. (comps.)

    1980-07-01T23:59:59.000Z

    An assessment of needs for materials of construction for fossil energy systems was prepared by ORNL staff members who conducted a literature search and interviewed various individuals and organizations that are active in the area of fossil energy technology. Critical materials problems associated with fossil energy systems are identified. Background information relative to the various technologies is given and materials research needed to enhance the viability and improve the economics of fossil energy processes is discussed. The assessment is presented on the basis of materials-related disciplines that impact fossil energy material development. These disciplines include the design-materials interface, materials fabrication technology, corrosion and materials compatibility, wear phenomena, ceramic materials, and nondestructive testing. The needs of these various disciplines are correlated with the emerging fossil energy technologies that require materials consideration. Greater emphasis is given to coal technology - particularly liquefaction, gasification, and fluidized bed combustion - than to oil and gas technologies because of the perceived inevitability of US dependence on coal conversion and utilization systems as a major part of our total energy production.

  3. NGNP SITE 2 HAZARDS ASSESSMENT

    SciTech Connect (OSTI)

    Wayne Moe

    2011-10-01T23:59:59.000Z

    The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

  4. U.S. Energy Information Administration (EIA) - Sector

    Gasoline and Diesel Fuel Update (EIA)

    AEO2012 (as of January 1, 2010) EUR (billion cubic feet per well) Assessment UnitState Area (square miles) Well spacing (wells per square mile) Percent of area untested Percent of...

  5. The efficiency of environmental impact assessments relating to noise issues

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    The efficiency of environmental impact assessments relating to noise issues Z. Krukle University of environmental impact assessments (EIA) relating to noise issues. The goal is attained through evaluation, effectiveness, environmental impact assessment, noise 1 Introduction Environmental impact assessment (EIA

  6. Simulation Enabled Safeguards Assessment Methodology

    SciTech Connect (OSTI)

    Robert Bean; Trond Bjornard; Thomas Larson

    2007-09-01T23:59:59.000Z

    It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology (SESAME) has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements in functionality. Drag and drop wireframe construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed.

  7. Assessment of Centerville powerhouse penstocks

    SciTech Connect (OSTI)

    Ahlgren, C.S.; Regan, P.J. [Pacific Gas & Electric Co., San Francisco, CA (United States); Mattson, R.A. [Structural Integrity Associates, Inc., San Jose, CA (United States)] [and others

    1995-12-31T23:59:59.000Z

    Pacific Gas & Electric Company (PG&E) has performed an assessment of the Centerville Powerhouse penstocks to determine their acceptability for continued long term service throughout the remaining 20 years of the project license. Preliminary penstock investigations were aimed at determining continued short term serviceability (5 years) through the end of construction of a new Centerville plant. Based on project economics, PG&E evaluated cancelling construction of the new plant and continuing operation of the existing Centerville Powerhouse. The preliminary studies were determined to be of insufficient detail for judging the penstocks` fitness for continued long term operation. Therefore, PG&E embarked upon a more detailed study. The acceptability of the Centerville penstocks for long term continued operation hinged mainly on the performance and reliability of the powerhouse control equipment and its ability to limit pressure rises, the material properties of the penstock shell, and the extent of erosion/corrosion and pitting within the penstock walls.

  8. Hawaii geothermal resource assessment: 1982

    SciTech Connect (OSTI)

    Thomas, D.M.; Cox, M.; Kavahikaua, J.P.; Lienert, B.R.; Mattice, M.

    1982-10-01T23:59:59.000Z

    The Geothermal Resource Assessment Program of the Hawaii Institute of Geophysics has conducted a series of geochemical and geophysical surveys throughout the State of Hawaii since February 1978. The results compiled during this study have been used to prepare a map of potential geothermal resource areas throughout the state. Approximately thirteen separate locations on three islands have been studied in detail. Of these, four areas are known to have direct evidence of a geothermal anomaly (Kilauea East Rift Zone, Kilauea Southwest Rift Zone, Kawaihae, and Olowalu-Ukumehame) and three others are strongly suspected of having at least a low-temperature resource (Hualalai west flank, Haleakala Southwest Rift, and Lualualei Valley). In the remainder of the areas surveyed, the data obtained either were contradictory or gave no evidence of a geothermal resource.

  9. Environmental assessment and social justice

    SciTech Connect (OSTI)

    Vogt, B.M.; Sorensen, J.H. [Oak Ridge National Lab., TN (United States); Hardee, H. [Tennessee Univ., Knoxville, TN (United States)

    1995-03-01T23:59:59.000Z

    The purpose of this document is to describe an approach to assessing environmental justice issues at the start of proposed project. It is a structural approach to screening using readily available census data and commercial products that emphasizes the ability to replicate results and provide systematic data that can be used to identify spatial inequities. While our discussion of the methodology addresses only public health and safety issues related to certain minority and cohort sub-groups, systematic use of methodology could provide a valuable screening tool for identifying impacts particular to low-income groups. While the assumptions can be questioned as to applicability, they are based both on theory and practical knowledge.

  10. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    SciTech Connect (OSTI)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01T23:59:59.000Z

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  11. EA-1836: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Final Environmental Assessment EA-1836: Final Environmental Assessment Norwich Cogeneration Initiative, Norwich, Connecticut The DOE National Energy Technology Laboratory (NETL)...

  12. Office of Enterprise Assessments Review of the Sandia National...

    Broader source: Energy.gov (indexed) [DOE]

    Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy Table of Contents Acronyms ......

  13. EA-1705: Draft Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter...

  14. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  15. Griffiss AFB integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01T23:59:59.000Z

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  16. A Resilient Condition Assessment Monitoring System

    SciTech Connect (OSTI)

    Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

    2012-08-01T23:59:59.000Z

    An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

  17. Predictive Dynamic Security Assessment through Advanced Computing

    SciTech Connect (OSTI)

    Huang, Zhenyu; Diao, Ruisheng; Jin, Shuangshuang; Chen, Yousu

    2014-11-30T23:59:59.000Z

    Abstract— Traditional dynamic security assessment is limited by several factors and thus falls short in providing real-time information to be predictive for power system operation. These factors include the steady-state assumption of current operating points, static transfer limits, and low computational speed. This addresses these factors and frames predictive dynamic security assessment. The primary objective of predictive dynamic security assessment is to enhance the functionality and computational process of dynamic security assessment through the use of high-speed phasor measurements and the application of advanced computing technologies for faster-than-real-time simulation. This paper presents algorithms, computing platforms, and simulation frameworks that constitute the predictive dynamic security assessment capability. Examples of phasor application and fast computation for dynamic security assessment are included to demonstrate the feasibility and speed enhancement for real-time applications.

  18. Motivation Literature Trans. Networks and Emissions Assessment Indices Link Importance Numerical Examples Summary a Environmental Impact Assessment of

    E-Print Network [OSTI]

    Nagurney, Anna

    Examples Summary a Environmental Impact Assessment of Transportation Networks with Degradable Links Environmental Impact Assessment Indices #12;Motivation Literature Trans. Networks and Emissions Assessment is gratefully acknowledged. Anna Nagurney, Qiang Qiang,, Ladimer S. Nagurney Environmental Impact Assessment

  19. Tiger Team assessment of the Pinellas Plant

    SciTech Connect (OSTI)

    Not Available

    1990-05-01T23:59:59.000Z

    This Document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Pinellas Plant, Pinellas County, Florida. The assessment wa directed by the Department's Office of Environment, Safety, and Health (ES H) from January 15 to February 2, 1990. The Pinellas Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environment Safety and Health, and Management areas and determines the plant's compliance with applicable Federal (including DOE), State, and local regulations and requirements.

  20. Geologic technical assessment of the Stratton Ridge salt dome, Texas, for potential expansion of the U.S. strategic petroleum reserve.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Snider, Anna C.; Looff, Karl M. (Geologic Consultant, Lovelady, TX)

    2006-11-01T23:59:59.000Z

    The Stratton Ridge salt dome is a large salt diapir located only some ten miles from the currently active Strategic Petroleum Reserve Site at Bryan Mound, Texas. The dome is approximately 15 miles south-southwest of Houston. The Stratton Ridge salt dome has been intensively developed, in the desirable central portions, with caverns for both brine production and product storage. This geologic technical assessment indicates that the Stratton Ridge salt dome may be considered a viable, if less-than-desirable, candidate site for potential expansion of the Strategic Petroleum Reserve (SPR). Past development of underground caverns significantly limits the potential options for use by the SPR. The current conceptual design layout of proposed caverns for such an expansion facility is based upon a decades-old model of salt geometry, and it is unacceptable, according to this reinterpretation of salt dome geology. The easternmost set of conceptual caverns are located within a 300-ft buffer zone of a very major boundary shear zone, fault, or other structural feature of indeterminate origin. This structure transects the salt stock and subdivides it into an shallow western part and a deeper eastern part. In places, the distance from this structural boundary to the design-basis caverns is as little as 150 ft. A 300-ft distance from this boundary is likely to be the minimum acceptable stand-off, from both a geologic and a regulatory perspective. Repositioning of the proposed cavern field is possible, as sufficient currently undeveloped salt acreage appears to be available. However, such reconfiguration would be subject to limitations related to land-parcel boundaries and other existing infrastructure and topographic constraints. More broadly speaking, the past history of cavern operations at the Stratton Ridge salt dome indicates that operation of potential SPR expansion caverns at this site may be difficult, and correspondingly expensive. Although detailed information is difficult to come by, widely accepted industry rumors are that numerous existing caverns have experienced major operational problems, including salt falls, sheared casings, and unintended releases of stored product(s). Many of these difficulties may be related to on-going differential movement of individual salt spines or to lateral movement at the caprock-salt interface. The history of operational problems, only some of which appear to be a matter of public record, combined with the potential for encountering escaped product from other operations, renders the Stratton Ridge salt dome a less-than-desirable site for SPR purposes.

  1. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Environmental Management (EM)

    December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

  2. Green Energy Property Tax Assessment (Tennessee) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the Treasury Tennessee offers a special ad valorem property tax assessment for certified green energy production facilities. Property that generates electricity from a certified...

  3. Industrial Assessment Centers Help Students, Communities Learn...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Another Industrial Assessment Center Student Success Story Dayakar Devaru, University of West Virginia graduate student, named Outstanding IAC Engineering Student for his...

  4. Wind Resource Assessment in Europe Using Emergy

    E-Print Network [OSTI]

    Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

    2014-01-01T23:59:59.000Z

    Wind energy assessment and wind farm simulation in Triunfo- Pernambuco, Brazil,wind resources for electrical energy production. Wind resources as- sessment of Brazil

  5. Enterprise Assessments Review, West Valley Demonstration Project...

    Energy Savers [EERE]

    Emergency Management Program Technical Basis and Emergency Preparedness The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in...

  6. Simulation and Risk Assessment Archived Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mellon University 412008 Simulation and Risk Assessment for Phase III Pilots Regional Carbon Sequestration Partnerships 1012008 Injection and Reservoir Hazard Management:...

  7. ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS...

    Broader source: Energy.gov (indexed) [DOE]

    ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR EIGHT TYPES OF CONSUMER PRODUCTS: ROOM AIR CONDITIONERS, WATER HEATERS, DIRECT HEATING EQUI?MENT, MOBILE...

  8. Microsoft Word - Fish Impact Assessment 070512.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    K Fish Habitat and Fish Population Impacts ASSESSMENT OF RELATIVE FISH HABITAT AND FISH POPULATION IMPACTS OF I-5 CORRIDOR REINFORCEMENT PROJECT ALTERNATIVES AND OPTIONS Report to:...

  9. Independent Oversight Assessment, Salt Waste Processing Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department...

  10. OFFICE ERGONOMICS A Self-Assessment

    E-Print Network [OSTI]

    Brownstone, Rob

    OFFICE ERGONOMICS A Self-Assessment Guide Environmental Health and Safety Office safety, along with additional information on ergonomics, is also available through the Dalhousie Safety Office

  11. Multiscale Assessment of Wildlife Sustainability in Switchgrass...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Multiscale Assessment of Wildlife Sustainability in Switchgrass Biofuel Feedstock Production Jun 29 2015 03:30 PM - 04:30 PM Chris Lituma, The University of Tennessee, Knoxville...

  12. Technology Readiness Assessments | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Documents Available for Download August 1, 2013 Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This document is a guide for those involved in...

  13. DOE/EA-0845 Environmental Assessment Expansion

    Broader source: Energy.gov (indexed) [DOE]

    45 Environmental Assessment Expansion of the Idaho National Engineering Laboratory Research Center March 1994 U.S. Department of Energy MASTER DOE Idaho Operations Office Idaho...

  14. Aquatic Macroinvertebrates for Assessing Water Quality Effects...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aquatic Macroinvertebrates for Assessing Water Quality Effects Associated with Bioenergy May 14 2015 03:30 PM - 04:30 PM Latha Baskaran, Environmental Sciences Division Center for...

  15. NASA Benchmarks Communications Assessment Plan - Developed By...

    Broader source: Energy.gov (indexed) [DOE]

    COMMUNICATIONS Assessment Plan NNSANevada Site Office Facility Representative Division Performance Objective: Lines of authority are clearly defined with clear and open...

  16. Conceptualising the effectiveness of impact assessment processes

    SciTech Connect (OSTI)

    Chanchitpricha, Chaunjit, E-mail: chaunjit@g.sut.ac.th [School of Environmental Health, Suranaree University of Technology, 111 University Avenue, Maung District, Nakhon Ratchasima 30000 (Thailand)] [School of Environmental Health, Suranaree University of Technology, 111 University Avenue, Maung District, Nakhon Ratchasima 30000 (Thailand); Bond, Alan, E-mail: alan.bond@uea.ac.uk [School of Environmental Sciences, University of East Anglia, Norwich NR4 7TJ (United Kingdom) [School of Environmental Sciences, University of East Anglia, Norwich NR4 7TJ (United Kingdom); Unit for Environmental Sciences and Management School of Geo and Spatial Sciences, Internal Box 375, North West University (Potchefstroom campus) (South Africa)

    2013-11-15T23:59:59.000Z

    This paper aims at conceptualising the effectiveness of impact assessment processes through the development of a literature-based framework of criteria to measure impact assessment effectiveness. Four categories of effectiveness were established: procedural, substantive, transactive and normative, each containing a number of criteria; no studies have previously brought together all four of these categories into such a comprehensive, criteria-based framework and undertaken systematic evaluation of practice. The criteria can be mapped within a cycle/or cycles of evaluation, based on the ‘logic model’, at the stages of input, process, output and outcome to enable the identification of connections between the criteria across the categories of effectiveness. This framework is considered to have potential application in measuring the effectiveness of many impact assessment processes, including strategic environmental assessment (SEA), environmental impact assessment (EIA), social impact assessment (SIA) and health impact assessment (HIA). -- Highlights: • Conceptualising effectiveness of impact assessment processes. • Identification of factors influencing effectiveness of impact assessment processes. • Development of criteria within a framework for evaluating IA effectiveness. • Applying the logic model to examine connections between effectiveness criteria.

  17. Independent Oversight Assessment, DOE Office of Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture...

  18. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  19. Enterprise Assessments Targeted Review, Idaho National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Fire Protection Program as Implemented at the Irradiated Materials Characterization Laboratory The Office of Nuclear Safety and Environmental Assessments, within the...

  20. Sandia National Laboratories: Solar Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Solar Resource Assessment Comments are closed. Renewable Energy Wind Energy Wind Plant Optimization Test Site Operations & Maintenance Safety: Test Facilities Capital Equipment...

  1. City of Aspen- Energy Assessment Rebate Program

    Broader source: Energy.gov [DOE]

    The City of Aspen encourages interested residents and businesses to increase the energy efficiency of homes and offices through the Energy Assessment Program. Participating homes and offices must...

  2. Water resource opportunity assessment: Fort Dix

    SciTech Connect (OSTI)

    Sullivan, G.P.; Hostick, D.J.; Elliott, D.B.; Fitzpatrick, Q.K.; Dahowski, R.T.; Dison, D.R

    1996-12-01T23:59:59.000Z

    This report provides the results of the water resource opportunity assessments performed by Pacific Northwest National Laboratory at the Fort Dix facility located in Fort Dix, New Jersey.

  3. Assessing Climate Change Impacts, Vulnerability and Adaptation...

    Open Energy Info (EERE)

    The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan...

  4. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    The review was conducted August 18-28, 2014. Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 More Documents &...

  5. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    tables. The review was conducted June 2-19, 2014. Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 More Documents &...

  6. Final Environmental Assessment for the Proposed Consolidation...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy DOI (U.S.) Department of the Interior DQF Detonator Qualification Facility DU depleted uranium DX Dynamic Experimentation (Division) EA environmental assessment EDE...

  7. First Principles Contributions to the Thermodynamic Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of Solid State Metal Hydride and Complex Hydride Phases given at the DOE Theory Focus Session on Hydrogen Storage Materials on May 18, 2006. storagetheorysessionop...

  8. Fort Drum integrated resource assessment. Volume 3, Resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  9. Receptor modeling assessment of particle total exposure assessment methodology data

    SciTech Connect (OSTI)

    Yakovleva, E.; Hopke, P.K.; Wallace, L.

    1999-10-15T23:59:59.000Z

    Data from the 1991 Particle Total Exposure Assessment Methodology (PTEAM) study in Riverside, CA, were analyzed using a new receptor modeling method. In this study, ambient (outdoor), indoor, and personal particulate matter (PM) concentrations and elemental concentrations of PM{sub 2.5} and PM{sub 10} were measured for a number of participants. These measurements made is possible to relate the pollution to which people were exposed throughout their daily activities with the outdoor air conditions. Personal daytime concentrations of the PM{sub 10} and majority of elements were significantly higher than outdoor or indoor concentrations, suggesting that a significant part of personal aerosol exposure is the result of personal daily activities. Possible sources of additional particulate mass include resuspension of particles that penetrate from the outdoors and formation of new particles during cooking, smoking, etc. Positive matrix factorization analysis was performed to describe the sources of personal exposure. To identify relative contribution of different sources, regression of the particulate matter mass against the factor contributions was performed. Major sources of PM{sub 2.5} were oil combustion, nonferrous metal operations, and motor vehicles. The mass contributions of particles from these sources were similar for outdoor air and personal exposure. Personal exposure to particles from these sources can be controlled by changing outdoor sources. The primary source of PM{sub 10} was soil.

  10. Assessment of Dissolved Oxygen Mitigation at Hydropower Dams Using an Integrated Hydrodynamic/Water Quality/Fish Growth Model

    SciTech Connect (OSTI)

    Bevelhimer, Mark S [ORNL; Coutant, Charles C [ORNL

    2006-07-01T23:59:59.000Z

    Dissolved oxygen (DO) in rivers is a common environmental problem associated with hydropower projects. Approximately 40% of all FERC-licensed projects have requirements to monitor and/or mitigate downstream DO conditions. Most forms of mitigation for increasing DO in dam tailwaters are fairly expensive. One area of research of the Department of Energy's Hydropower Program is the development of advanced turbines that improve downstream water quality and have other environmental benefits. There is great interest in being able to predict the benefits of these modifications prior to committing to the cost of new equipment. In the case of turbine replacement or modification, there is a need for methods that allow us to accurately extrapolate the benefits derived from one or two turbines with better design to the replacement or modification of all turbines at a site. The main objective of our study was to demonstrate a modeling approach that integrates the effects of flow and water quality dynamics with fish bioenergetics to predict DO mitigation effectiveness over long river segments downstream of hydropower dams. We were particularly interested in demonstrating the incremental value of including a fish growth model as a measure of biological response. The models applied are a suite of tools (RMS4 modeling system) originally developed by the Tennessee Valley Authority for simulating hydrodynamics (ADYN model), water quality (RQUAL model), and fish growth (FISH model) as influenced by DO, temperature, and available food base. We parameterized a model for a 26-mile reach of the Caney Fork River (Tennessee) below Center Hill Dam to assess how improvements in DO at the dam discharge would affect water quality and fish growth throughout the river. We simulated different types of mitigation (i.e., at the turbine and in the reservoir forebay) and different levels of improvement. The model application successfully demonstrates how a modeling approach like this one can be used to assess whether a prescribed mitigation is likely to meet intended objectives from both a water quality and a biological resource perspective. These techniques can be used to assess the tradeoffs between hydropower operations, power generation, and environmental quality.

  11. Forecasting and assessing the impact of urban sprawl in coastal watersheds along eastern Lake Michigan

    E-Print Network [OSTI]

    Michigan RUNNING TITLE: Urban Sprawl along Lake Michigan Bryan C. Pijanowski1,2 , Bradley Shellito3 Miles Building 1405 S. Harrison Road Michigan State University East Lansing, Michigan USA 48824 (517 Science Building Michigan State University East Lansing, Michigan USA 48824 3 Department of Geography #12

  12. Application of Cutting-Edge 3D Seismic Attribute Technology to the Assessment of Geological Reservoirs for CO2 Sequestration

    SciTech Connect (OSTI)

    Christopher Liner; Jianjun Zeng; Po Geng Heather King Jintan Li; Jennifer Califf; John Seales

    2010-03-31T23:59:59.000Z

    The goals of this project were to develop innovative 3D seismic attribute technologies and workflows to assess the structural integrity and heterogeneity of subsurface reservoirs with potential for CO{sub 2} sequestration. Our specific objectives were to apply advanced seismic attributes to aide in quantifying reservoir properies and lateral continuity of CO{sub 2} sequestration targets. Our study area is the Dickman field in Ness County, Kansas, a type locality for the geology that will be encountered for CO{sub 2} sequestration projects from northern Oklahoma across the U.S. midcontent to Indiana and beyond. Since its discovery in 1962, the Dickman Field has produced about 1.7 million barrels of oil from porous Mississippian carbonates with a small structural closure at about 4400 ft drilling depth. Project data includes 3.3 square miles of 3D seismic data, 142 wells, with log, some core, and oil/water production data available. Only two wells penetrate the deep saline aquifer. Geological and seismic data were integrated to create a geological property model and a flow simulation grid. We systematically tested over a dozen seismic attributes, finding that curvature, SPICE, and ANT were particularly useful for mapping discontinuities in the data that likely indicated fracture trends. Our simulation results in the deep saline aquifer indicate two effective ways of reducing free CO{sub 2}: (a) injecting CO{sub 2} with brine water, and (b) horizontal well injection. A tuned combination of these methods can reduce the amount of free CO{sub 2} in the aquifer from over 50% to less than 10%.

  13. Environmental assessment of ground water compliance activities at the Uranium Mill Tailings Site, Spook, Wyoming. Revision 0

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    This document is an environmental assessment of the Spook, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site. It analyzes the impacts of the U.S. Department of Energy (DOE) proposed action for ground water compliance. The proposed action is to comply with the U.S. Environmental Protection Agency (EPA) standards for the UMTRA Project sites (40 CFR Part 192) by meeting supplemental standards based on the limited use ground water at the Spook site. This proposed action would not require site activities, including ground water monitoring, characterization, or institutional controls. Ground water in the uppermost aquifer was contaminated by uranium processing activities at the Spook site, which is in Converse County, approximately 48 miles (mi) (77 kilometers [km]) northeast of Casper, Wyoming. Constituents from the site infiltrated and migrated into the uppermost aquifer, forming a plume that extends approximately 2500 feet (ft) (800 meters [m]) downgradient from the site. The principal site-related hazardous constituents in this plume are uranium, selenium, and nitrate. Background ground water in the uppermost aquifer at the site is considered limited use. It is neither a current nor a potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed in public water supply systems (40 CFR {section} 192.11 (e)). Background ground water quality also is poor due to first, naturally occurring conditions (natural uranium mineralization associated with an alteration front), and second, the effects of widespread human activity not related to uranium milling operations (uranium exploration and mining activities). There are no known exposure pathways to humans, animals, or plants from the contaminated ground water in the uppermost aquifer because it does not discharge to lower aquifers, to the surface, or to surface water.

  14. Joint environmental assessment for western NPR-1 3-dimensional seismic project at Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The Department of Energy (DOE), in conjunction with the Bureau of Land Management (BLM), has prepared an Environmental Assessment (DOE/EA-1124) to identify and evaluate the potential environmental impacts of the proposed geophysical seismic survey on and adjacent to the Naval Petroleum Reserve No.1 (NPR-1), located approximately 35 miles west of Bakersfield, California. NPR-1 is jointly owned and operated by the federal government and Chevron U.S.A. Production Company. The federal government owns about 78 percent of NPR-1, while Chevron owns the remaining 22 percent. The government`s interest is under the jurisdiction of DOE, which has contracted with Bechtel Petroleum Operations, Inc. (BPOI) for the operation and management of the reserve. The 3-dimensional seismic survey would take place on NPR-1 lands and on public and private lands adjacent to NPR-1. This project would involve lands owned by BLM, California Department of Fish and Game (CDFG), California Energy Commission (CEC), The Nature Conservancy, the Center for Natural Lands Management, oil companies (Chevron, Texaco, and Mobil), and several private individuals. The proposed action is designed to provide seismic data for the analysis of the subsurface geology extant in western NPR-1 with the goal of better defining the commercial limits of a currently producing reservoir (Northwest Stevens) and three prospective hydrocarbon bearing zones: the {open_quotes}A Fan{close_quotes} in Section 7R, the 19R Structure in Section 19R, and the 13Z Structure in Section 13Z. Interpreting the data is expected to provide NPR-1 owners with more accurate locations of structural highs, faults, and pinchouts to maximize the recovery of the available hydrocarbon resources in western NPR-1. Completion of this project is expected to increase NPR-1 recoverable reserves, and reduce the risks and costs associated with further exploration and development in the area.

  15. Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies

    SciTech Connect (OSTI)

    Milbrandt, A.; Overend, R. P

    2008-11-01T23:59:59.000Z

    This survey of biomass resource assessments and assessment capabilities in Asia-Pacific Economic Cooperation (APEC) economies considered various sources: academic and government publications, media reports, and personal communication with contacts in member economies.

  16. Electrical and Computer Engineering Department Assessment Report; pg 1 of 5 MSU Departmental Assessment Update

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Electrical and Computer Engineering Department Assessment Report; pg 1 of 5 MSU Departmental Assessment Update Spring 2007 Department: Electrical and Computer Engineering Department Head: Jim Peterson of Science in Electrical Engineering · Bachelor of Science in Computer Engineering · Minor in Electrical

  17. Electrical and Computer Engineering Department Assessment Plan; pg 1 of 6 MSU Departmental Assessment Plan

    E-Print Network [OSTI]

    Dyer, Bill

    Electrical and Computer Engineering Department Assessment Plan; pg 1 of 6 MSU Departmental Assessment Plan 2007-2009 Department: Electrical and Computer Engineering Department Head: Jim Peterson in Electrical Engineering · Bachelor of Science in Computer Engineering · Minor in Electrical Engineering

  18. Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of

    E-Print Network [OSTI]

    Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

  19. E-Area Performance Assessment Interim Measures Assessment FY2005

    SciTech Connect (OSTI)

    Stallings, M

    2006-01-31T23:59:59.000Z

    After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

  20. Fort Drum integrated resource assessment

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01T23:59:59.000Z

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  1. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01T23:59:59.000Z

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  2. Assessing Student Learning We typically assess student learning in terms of their grades on

    E-Print Network [OSTI]

    Champagne, Frances A.

    need to be student-focused rather than instructor-focused. Focus on the learning resulting fromAssessing Student Learning We typically assess student learning in terms of their grades on quizzes should be linked to our learning objectives. To properly assess student learning, you need to know what

  3. Assessing Student Learning: Overview Page 1 AssessingStudentLearning:Overview

    E-Print Network [OSTI]

    Dyer, Bill

    are focusing more on what the students have learned (somewhere), rather than on what is covered Assessing Student Learning: Overview Page 1 AssessingStudentLearning:Overview September 12. The primary assessment of degree programs for accreditation purposes is focused on verifying that students

  4. STARS Training Needs Assessment Learner Instructions 07/2009 1 STARS Training Needs Assessment

    E-Print Network [OSTI]

    Ford, James

    STARS Training Needs Assessment Learner Instructions 07/2009 1 STARS Training Needs Assessment. · Click the STARS (Training) tab. · Click My Training Needs in the left menu. · Click the secure link to continue to My Training Needs. On the Training Needs Assessment page, click the box to the left of every

  5. Laboratory Hazard Assessment Tool UC Laboratory Hazard Assessment v11 UC Regents Page 1 of 28

    E-Print Network [OSTI]

    Aluwihare, Lihini

    Laboratory Hazard Assessment Tool UC Laboratory Hazard Assessment v11 © UC Regents Page 1 of 28 This Laboratory Hazard Assessment Tool (LHAT) facilitates identification of hazards and identifies the Personal as hazards and personnel change, and at least once every 12 months, irrespective of changes to hazards

  6. MSU Departmental Assessment Plan Department: Physics

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    1 MSU Departmental Assessment Plan 2009-2011 Department: Physics Department Head: Dick Smith Interdisciplinary Option Physics Teaching Option Physics Minor (Non-Teaching) #12;2 Physics Assessment Contact Name : Randy Babbitt, Undergraduate Curriculum Committee Chair Phone : 406-994-6156 E-mail: babbitt@physics

  7. MSU Departmental Assessment Plan Department: Physics

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2007-2009 Department: Physics Department Head: Bill Hiscock Interdisciplinary Option Physics Teaching Option Physics Minor (Non-Teaching) #12;Physics Assessment Contact Name : Bill Hiscock Phone : 406-994-6170 E-mail: hiscock@physics.montana.edu Degree Objectives To provide

  8. Missouri Industrial Assessment Center College of Engineering

    E-Print Network [OSTI]

    Noble, James S.

    , education, outreach and industrial energy audit. The audit is completely free, with summary recommendationMissouri Industrial Assessment Center College of Engineering University of Missouri-Columbia #12;Mo Department of Energy's requirement, the ultimate goal of Missouri Industrial Assessment Center is to be "the

  9. STOCK ASSESSMENT OF THE BLUE CRAB

    E-Print Network [OSTI]

    STOCK ASSESSMENT OF THE BLUE CRAB IN CHESAPEAKE BAY 2011 #12;2011 Stock assessment for blue crab in Chesapeake Bay iii Executive Summary The blue crab (Callinectes sapidus) is an icon for the Chesapeake Bay region. The commercial fisheries for blue crab in the Bay remain one of the most valuable fishery sectors

  10. Life Cycle Assessment of Reclaimed Asphalt Pavement

    E-Print Network [OSTI]

    Minnesota, University of

    Life Cycle Assessment of Reclaimed Asphalt Pavement to Improve Asphalt Pavement Sustainability By Pavement (RAP) Courtesy of http://myconstructionphotos.smugmug.com/ RAP #12;Transport Back to the Plant-melt old binder on the RAP #12;Life Cycle Assessment (LCA) · #12;Asphalt Pavement Life Cycle Road

  11. Offshore Wind Power Farm Environmental Impact Assessment

    E-Print Network [OSTI]

    Horns Rev Offshore Wind Power Farm Environmental Impact Assessment on Water Quality #12;Prepared with a planned 150 MW offshore wind farm at Horns Rev, an assessment was made of the effects the wind farm would for the preparation of EIA studies for offshore wind farms." Horns Rev is situated off Blåvands Huk, which is Denmark

  12. Environmental Site Assessment Vermillion Highlands Property

    E-Print Network [OSTI]

    Netoff, Theoden

    Phase I Environmental Site Assessment Vermillion Highlands Property Dakota County, Minnesota\\WorkFiles\\Vermillion Highlands\\Phase I ESA\\Report\\Final\\PHIESA_ Report_V2.0.doc i Phase I Environmental Site Assessment #12;BARR ENGINEERING CO. P:\\Mpls\\23 MN\\19\\2319B05 UMore park environmental

  13. BIOMEDICAL AND HEALTH Assessing the Environmental, Health

    E-Print Network [OSTI]

    Magee, Joseph W.

    BIOMEDICAL AND HEALTH Assessing the Environmental, Health and Safety Impact of Nanoparticles are urgently needed to support risk assessments and regulatory policy decisions regarding materials containing · Environmental Protection Agency · DuPont · BASF · Evonik · Cabot · General Electric Approach The quartz crystal

  14. MSU Departmental Assessment Plan Department: Computer Science

    E-Print Network [OSTI]

    Dyer, Bill

    MSU Departmental Assessment Plan 2009-2011 Department: Computer Science Department Head: John Science o Interdisciplinary Option o Professional Option M.S. in Computer Science Ph.D. in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment Plan

  15. MSU Departmental Assessment Plan Department: Computer Science

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2007-2009 Department: Computer Science Department Head: Michael in Computer Science MS in Computer Science PhD in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment Plan Spring 2007 The Department of Computer Science BS

  16. MSU Departmental Assessment Plan Department: Computer Science

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2011-2013 Department: Computer Science Department Head: John.S. in Computer Science o Interdisciplinary Option o Professional Option · M.S. in Computer Science · Ph.D. in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment

  17. 1998 FFTF annual system assessment reports

    SciTech Connect (OSTI)

    Guttenberg, S.

    1998-03-19T23:59:59.000Z

    The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.

  18. GROUNDWATER MAPPING AND ASSESSMENT IN BRITISH COLUMBIA

    E-Print Network [OSTI]

    #12;r GROUNDWATER MAPPING AND ASSESSMENT IN BRITISH COLUMBIA VOLUME I: Review and Recommendations and Turner Groundwater Consultants P.O. Box 43001 Victoria, B.C. V8X 3G2 October 1993 #12;DISCLAIMER of Groundwater Information in British Columbia 6 2.1 Sources of Groundwater Mapping and Assessment Information 6

  19. Oregon Climate Assessment Report December 2010

    E-Print Network [OSTI]

    Pierce, Stephen

    - Climate change and agriculture in Oregon"" " " " " 151 Chapter 5 - The potential effects of climate changeOregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute #12;Oregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute Recommended citation

  20. SEISMIC VULNERABILITY ASSESSMENT USING AMBIENT VIBRATIONS

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SEISMIC VULNERABILITY ASSESSMENT USING AMBIENT VIBRATIONS: METHOD AND VALIDATION Clotaire Michel, France cmichel@obs.ujf-grenoble.fr Abstract Seismic vulnerability in wide areas is usually assessed like USA or Italy. France is a country with moderate seismicity so that it requires lower-cost methods