Final Environmental Assessment for the Cheyenne-Miracle Mile...  

Broader source: Energy.gov (indexed) [DOE]

List of Acronyms ACSR Aluminum conductor steel reinforced AM amplitude modulated APCD Air Pollution Control Division AQD Air Quality Division ARH-AU Archer-Ault AU-CH...

2

EA-1456: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines...

3

EA-1456: Finding of No Signficant Impact  

Broader source: Energy.gov [DOE]

Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado

4

Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

Not Available

1990-08-01T23:59:59.000Z

5

Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico  

SciTech Connect (OSTI)

The National Environmental Policy Act of 1969 (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE), National Nuclear Security Administration (NNSA), follows the Council on Environmental Quality regulations (40 CFR 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an environmental assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an environmental impact statement (EIS) or issue a Finding of No Significant Impact. Los Alamos National Laboratory (LANL) is a national security laboratory located at Los Alamos, New Mexico, that comprises about 40 square miles (mi{sup 2}) (103.6 square kilometers [km{sup 2}]) of buildings, structures, and forested land (Figure 1). It is administered by NNSA for the Federal government and is managed and operated under contract by the University of California (UC). The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation Division (DX) to create a central core area of facilities, including offices, laboratories, and other support structures, at LANL's Two-Mile Mesa Complex, which comprises portions of Technical Area (TA) 6, TA-22, and TA-40. This Proposed Action would involve constructing new buildings; consolidating existing operations and offices; enhancing utilities, roads, and security infrastructure; and demolishing or removing older buildings, structures, and transportables at various technical areas used by DX (Figure 2). This EA has been prepared to assess the potential environmental consequences of this proposed construction, operational consolidation, and demolition project. The objectives of this EA are to (1) describe the underlying purpose and need for NNSA action; (2) describe the Proposed Action and identify and describe any reasonable alternatives that satisfy the purpose and need for agency action; (3) describe baseline environmental conditions at LANL; (4) analyze the potential indirect, direct, and cumulative effects to the existing environment from implementation of the Proposed Action, and (5) compare the effects of the Proposed Action with the No Action Alternative and other reasonable alternatives. For the purposes of compliance with NEPA, reasonable alternatives are identified as being those that meet NNSA's purpose and need for action by virtue of timeliness, appropriate technology, and applicability to LANL. The EA process provides NNSA with environmental information that can be used in developing mitigative actions, if necessary, to minimize or avoid adverse effects to the quality of the human environment and natural ecosystems should NNSA decide to proceed with implementing the Proposed Action at LANL. Ultimately, the goal of NEPA, and this EA, is to aid NNSA officials in making decisions based on an understanding of environmental consequences and in taking actions that protect, restore, and enhance the environment.

N /A

2003-11-03T23:59:59.000Z

6

Curriculum Vitae: Albie Felix Miles  

E-Print Network [OSTI]

pest management; biological control; food systems and sustainability; introduction to environmental science; nature and properties of soils; soil ecology; integrated soil fertility management; researchCurriculum Vitae: Albie Felix Miles Ph.D. Candidate Environmental Science, Policy and Management

Silver, Whendee

7

Three Mile Island: the financial fallout  

SciTech Connect (OSTI)

The nuclear accident at Three Mile Island raised serious questions about the financial ability of the electric utility company owners to clean up and repair the damaged reactor facilities while continuing to provide reliable electric service to customers. Financial insolvency of the companies is not imminent and power supplies are assured for the immediate future. However, the loss of earnings capability by the Metropolitan Edison Company makes it questionable whether it can fund its share of the clean-up costs and maintain system reliability without large rate increases or some external financial assistance. The accident has shown that the utilities and Federal and State regulatory agencies were not prepared to deal with recovery from such a large financial loss. The Department of Energy should move swiftly to assess the financial needs of the affected utilities and develop plans for meeting them.

Not Available

1980-07-07T23:59:59.000Z

8

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA) Indexed Site

Three Mile Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

9

Three Mile Island: then and now  

SciTech Connect (OSTI)

A review of the Three Mile Island Unit 2 accident is presented. Current activities to clean up the reactor are described.

Trauger, D.B.

1980-01-01T23:59:59.000Z

10

The train problem assumes a circular track 101 miles in circumference. The track is labeled clockwise in miles starting at due north. ie. 0 through 100. Mile 101 would be at the same spot as mile 0.  

E-Print Network [OSTI]

A3: trains The train problem assumes a circular track 101 miles in circumference. The track as mile 0. Train1 starts at mile 0 going clockwise. Train2 starts at mile 50 also going clockwise. The program prompts for speeds of each train in mph. The output is the mile (or fraction) at which one train

Huth, Michael

11

Mile High: Noncompliance Determination (2012-SE-4501)  

Broader source: Energy.gov [DOE]

DOE issued a Notice of Noncompliance Determination to Mile High Equipment, LLC finding that Ice-O-Matic brand automatic commercial ice maker basic model ICE2106 FW, HW does not comport with the energy conservation standards.

12

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network [OSTI]

than 10 miles from the nuclear plant at any time during thewithin 10 miles of the nuclear plant is about 51 of thewithin 50 miles of the nuclear plant is less than 1% of the

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

13

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network [OSTI]

Commission on the Accident at Three Mile Island (Fabrikant,Commission on the Accident at Three Mile Island. (Fahrikant,Commission on the Accident at Three Mile Island. (Fabrikant,

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

14

Finance Division EXTRA MILE AWARD PROGRAM  

E-Print Network [OSTI]

Finance Division EXTRA MILE AWARD PROGRAM Nomination Form Instructions Any fulltime or parttime permanent or temporary SPA employee within the Finance Division who works 20 or more provided. The seven major departments within the Finance Division to choose from are described below

Crews, Stephen

15

Fact #860 February 16, 2015 Relationship of Vehicle Miles of...  

Broader source: Energy.gov (indexed) [DOE]

travel. At the beginning of 2014, the vehicle miles of travel increased even as gasoline prices were increasing. Relationship of Vehicle Miles of Travel and the Price of Gasoline,...

16

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network [OSTI]

occurred during the nuclear accident, and probably noHEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT MILE ISLAND JacobENG-48 HEALTH EFFECTS OF THE NUCLEAR ACCIDENT A T THREE MILE

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

17

Fact #860 February 16, 2015 Relationship of Vehicle Miles of...  

Energy Savers [EERE]

Fact 860 February 16, 2015 Relationship of Vehicle Miles of Travel and the Price of Gasoline - Dataset Fact 860 February 16, 2015 Relationship of Vehicle Miles of Travel and the...

18

1st Mile | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place:ReferenceEditWisconsin:YBR14 CCR 搂ResourcesMile Jump to:

19

EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy抯 Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

20

Three Mile Island: meltdown of democracy  

SciTech Connect (OSTI)

Strong local opposition to a start-up of Unit 1 at Three Mile Island continues because citizen distrust of General Public Utilities was found in post-accident studies to have been justified. Several citizen groups have monitored the Unit 2 clean-up activities and have not been reassured by either the President's Commission or the Nuclear Regulatory Commission. Efforts to improve public relations by distributing radiation kits or other strategies have been outweighed by evidence of government manipulation of early bomb test data and poor industry planning. Arguments over who is responsible for the accident and who is liable for the cost have further undermined credibility. Area residents have received three recent legal signals that their position may prevail. (DCK)

Walsh, E.J.

1983-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

22

Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled  

Broader source: Energy.gov [DOE]

For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy.

23

Entiat 4Mile WELLs Completion Report, 2006.  

SciTech Connect (OSTI)

The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

Malinowksi, Richard

2007-01-01T23:59:59.000Z

24

Debate over waste imperils 3-Mile cleanup  

SciTech Connect (OSTI)

The cleanup is a task of extraordinary proportions. Every step in the cleanup must be taken in a highly sensitive political and regulatory environment. A demineralizer or ion exchange filtration unit was installed in order that the fission products could be removed from the water spilled in the auxiliary and fuel handling buildings. GPU later vented krypton gas. Twice now engineers have made cautions entries into the containment building as part of the effort to size up the job. Cleanup will be costly, requiring many workers. Some wastes will require special packaging in hundreds of containers with shielded overpacks, plus bulky items of hardware and equipment that cannot be easily packaged. There will be the damaged fuel assemblies from the reactor core. Removing the fuel from the reactor may be difficult. A troublesome waste disposal question has to do with the material to be generated in cleaning up the containment building's sump water. GPU's man in charge of clean-up strategy is to collect the wastes in a form that permits maximum flexibility with respect to their stage, packaging, transport, and ultimate disposal. If plans for disposal of all the wastes from the cleanup are to be completed, an early commitment by Pennsylvania and other northeastern states to establish a burial ground for low level waste generated within the region is needed. Also a speedy commitment by NRC, DOE, and Congress to a plan for disposal of the first-stage zeolites is needed. Should there be a failure to cope with the wastes that Three Mile Island cleanup generates, the whole nuclear enterprise may suffer.

Carter, L.J.

1980-10-10T23:59:59.000Z

25

Laboratory measurement verification of laser hazard analysis for miles weapon simulators used in force on force exercises.  

SciTech Connect (OSTI)

Due to the change in the batteries used with the Small Arm Laser Transmitters (SALT) from 3-volts dc to 3.6-volts dc and changes to SNL MILES operating conditions, the associated laser hazards of these units required re-evaluation to ensure that the hazard classification of the laser emitters had not changed as well. The output laser emissions of the SNL MILES, weapon simulators and empire guns, used in Force-On-Force (FOF) training exercises, was measured in accordance to the ANSI Standard Z136.4-2005, ''Recommended Practice for Laser Safety Measurements for Hazard Evaluation''. The laser hazard class was evaluated in accordance with the ANSI Standard Z136.1-2000, ''Safe Use of Lasers'', using ''worst'' case conditions associated with these MILES units. Laser safety assessment was conducted in accordance with the ANSI Standard Z136.6-2005, ''Safe Use of Lasers Outdoors''. The laser hazard evaluation of these MILES laser emitters was compared to and supersedes SAND Report SAND2002-0246, ''Laser Safety Evaluation of the MILES and Mini MILES Laser Emitting Components'', which used ''actual'' operating conditions of the laser emitters at the time of its issuance.

Augustoni, Arnold L.

2006-08-01T23:59:59.000Z

26

Odometer Versus Self-Reported Estimates of Vehicle Miles Traveled  

Reports and Publications (EIA)

The findings described here compare odometer readings with self-reported estimates of Vehicle Miles Traveled (VMT) to investigate to what extent self-reported VMT is a reliable surrogate for odometer-based VMT.

2000-01-01T23:59:59.000Z

27

Full Useful Life (120,000 miles) Exhaust Emission Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Full Useful Life (120,000 miles) Exhaust Emission Performance of a NOx Adsorber and Diesel Particle Filter Equipped Passenger Car and Medium-Duty Engine in Conjunction with...

28

Wind, Klickitat, Hood and Fifteen Mile Habitat Site Visits  

E-Print Network [OSTI]

Wind, Klickitat, Hood and Fifteen Mile Habitat Site Visits April 17-19th, 2013 ISRP Review Team (4 at the Sheraton Airport at 7:15 a.m. Site Visits: Depart airport and head east: Wind, Klickitat, White Salmon in this review: 1998-019-00 Wind River Watershed Underwood Conservation District (UCD), US Forest Service (USFS

29

Wireless Network Interface Energy Conservation for Bottlenecked First Mile Networks  

E-Print Network [OSTI]

user using the limited upstream capacity of the home broad- band link. We analyze the behavior of two- posed by this behavior on a client side energy saving mechanism. We also describe techniques that allowWireless Network Interface Energy Conservation for Bottlenecked First Mile Networks Surendar

Chandra, Surendar

30

Creating Efficiencies in Last Mile Delivery through Workforce  

E-Print Network [OSTI]

objectives 路 Extend the planning horizon to achieve more efficiency 路 Discuss general trends in workforceCreating Efficiencies in Last Mile Delivery through Workforce Management Maciek Nowak Associate workforce management and its advantages 路 Discuss new research looking to expand the customer service

Bustamante, Fabi谩n E.

31

Equity Evaluation of Vehicle Miles Traveled Fees in Texas  

E-Print Network [OSTI]

to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

Larsen, Lisa Kay

2012-10-19T23:59:59.000Z

32

Boise State University Automobile Use Mileage Log (Documentation for Business Miles)  

E-Print Network [OSTI]

Boise State University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03 University Automobile Use Mileage Log (Documentation for Business Miles) Rev. 03/10 PAGE ____ (IF YOU NEED

Barrash, Warren

33

NASA Green Flight Challenge: Conceptual Design Approaches and Technologies to Enable 200 Passenger Miles  

E-Print Network [OSTI]

-diesel, and other bio-fuel engines. The aircraft are using various technologies to improve aerodynamic, propulsionW = = = Jet Propellant Knots True Airspeed Kilo-Watt MPG = Miles Per Gallon MPGe MSL = = Miles Per Gallon

Waliser, Duane E.

34

Miles Below the Earth: The Next-Generation of Geothermal Energy...  

Broader source: Energy.gov (indexed) [DOE]

Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy February 7, 2011 - 12:34pm Addthis John Schueler...

35

100,000-Mile Evaluation of Transit Buses Operated on Biodiesel...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

00,000-Mile Evaluation of Transit Buses Operated on Biodiesel Blends (B20) 100,000-Mile Evaluation of Transit Buses Operated on Biodiesel Blends (B20) Presentation given at DEER...

36

Analysis of Three Mile Island-Unit 2 accident  

SciTech Connect (OSTI)

The Nuclear Safety Analysis Center (NSAC) of the Electric Power Research Institute has analyzed the Three Mile Island-2 accident. Early results of this analysis were a brief narrative summary, issued in mid-May 1979 and an initial version of this report issued later in 1979 as noted in the Foreword. The present report is a revised version of the 1979 report, containing summaries, a highly detailed sequence of events, a comparison of that sequence of events with those from other sources, 25 appendices, references and a list of abbreviations and acronyms. A matrix of equipment and system actions is included as a folded insert.

Not Available

1980-03-01T23:59:59.000Z

37

Three Mile Island waste management: a DOE Perspective  

SciTech Connect (OSTI)

The Department of Energy (DOE) is conducting waste management research and development activities which are applicable to the cleanup of the Three Mile Island-Unit 2 nuclear reactor. These activities have enabled DOE to provide timely assistance to General Public Utilities (GPU), the utility owner, the Nuclear Regulatory Commission (NRC), and the State of Pennsylvania in their efforts to quickly and safely clean up the damaged reactor. The DOE has been particularly active in evaluating proposed cleanup systems, providing information on waste characteristics, and advising GPU and NRC as to appropriate disposal methods for the waste generated during the cleanup. A description and discussion of some of these activities is presented.

D'Ambrosia, J.T.

1982-01-01T23:59:59.000Z

38

Integrated defueling system for Three Mile Island Unit 2  

SciTech Connect (OSTI)

The unique clean-up requirements of Three Mile Island Unit 2 have posed first-of-a-kind challenges for the equipment, tools, and operators involved in the defueling effort. Various equipment components and specialty remote tools were designed as an integrated defueling system to provide a means of safely working above the reactor and removing core debris. The basic defueling system consists of support equipment and specialty remote tools for specific operations. This paper describes the different equipment and tools, and explains the key interfaces and features of the integrated defueling system.

Brown, D.A.; Gallagher, R.E.; Rider, R.L.

1986-01-01T23:59:59.000Z

39

Seven Mile, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to: navigation, search| Open EnergySermatecMile, Ohio: Energy

40

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

SciTech Connect (OSTI)

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

SciTech Connect (OSTI)

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-01-01T23:59:59.000Z

42

Utilization of the atmospheric release advisory capability (ARAC) services during and after the Three Mile Island accident  

SciTech Connect (OSTI)

At 0820 PST on 28 March 1979, the Department of Energy's Emergency Operations Center advised the Atmospheric Release Advisory Capability (ARAC) that the Three Mile Island nuclear power plant in Harrisburg, Pennsylvania, had experienced an accident some four hours earlier, resulting in the atmospheric release of xenon-133 and krypton-88. This report describes ARAC's response to the Three Mile Island accident, including the role ARAC played throughout the 20 days that real-time assessments were made available to the Department of Energy on-scene commander. It also describes the follow-up population-dose calculations performed for the President's Commission on Three Mile Island. At the request of the Nuclear Regulatory Commission, a questionnaire addressing the usefulness of ARAC products during the accident was sent to ARAC-product users. A summary of the findings from this questionnaire, along with recommendations for improving ARAC service, is also presented. The accident at Mississauga, Ontario, Canada, is discussed in the context of a well-planned emergency response by local and Federal officials.

Knox, J.B.; Dickerson, M.H.; Greenly, G.D.; Gudiksen, P.H.; Sullivan, T.J.

1980-07-01T23:59:59.000Z

43

Accident at Three Mile Island: the human dimensions  

SciTech Connect (OSTI)

A separate abstract was prepared for each of the 19 chapters, divided according to the following Parts: (1) Public Perceptions of Nuclear Energy; (2) Local Responses to Nuclear Plants; (3) Institutional Responsibilities for Nuclear Energy; (4) The Interaction of Social and Technical Systems; and (5) Implications for Public Policy. All of the abstracts will appear in Energy Abstracts for Policy Analysis (EAPA); three will appear in Energy Research Abstracts (ERA). At the request of the President's Commission on the Accident at Three Mile Island (the Kemeny Commission), the Social Science Research Council commissioned social scientists to write a series of papers on the human dimensions of the event. This volume includes those papers, in revised and expanded form, and a comprehensive bibliography of published and unpublished social science research on the accident and its aftermath.

Sills, D.L.; Wolf, C.P.; Shelanski, V.B. (eds.)

1982-01-01T23:59:59.000Z

44

Hidden costs of the accident at Three Mile Island  

SciTech Connect (OSTI)

It has been possible to identify a significant drop in the performance of Pressurised Water Reactors (PWRs) in the western world following the accident at Three Mile Island (TMI). Although there are indications that the magnitude of the load factor reduction was slightly larger in the U.S., there is nevertheless strong evidence to suggest that the response was felt in all countries with operating PWRs. The effect did not, however, extend to other reactor systems; even the generically similar Boiling Water Reactor (BWR) suffered no drop in output. It is estimated that the costs, worldwide, of this fall in performance are of the same order as the TMI clean-up operation.

Evans, N.

1982-09-01T23:59:59.000Z

45

Three Mile Island accident and post-accident recovery: what did we learn  

SciTech Connect (OSTI)

A description of the accident at Three Mile Island-2 reactor is presented. Activities related to the cleanup and decontamination of the reactor are described.

Collins, E.D.

1982-01-01T23:59:59.000Z

46

Vegetation survey of Four Mile Creek wetlands. [Savannah River Plant  

SciTech Connect (OSTI)

A survey of forested wetlands along upper Four Mile Creek was conducted. The region from Road 3 to the creek headwaters was sampled to evaluate the composition of woody and herbaceons plant communities. All sites were found to fall into either the Nyssa sylvatica (Black Gum) -- Persea borbonia (Red Bay) or Nyssa sylvatica -- Acer rubrum (Red Maple) types. These community types are generally species-rich and diverse. Previous studies (Greenwood et al., 1990; Mackey, 1988) demonstrated contaminant stress in areas downslope from the F- and H-Area seepage basins. In the present study there were some indications of contaminant stress. In the wetland near H-Area, shrub basal area, ground cover stratum species richness, and diversity were low. In the area surrounding the F-Area tree kill zone, ground cover stratum cover and shrub basal area were low and ground cover stratum species richness was low. The moderately stressed site at F-Area also showed reduced overstory richness and diversity and reduced ground cover stratum richness. These results could, however, be due to the very high basal area of overstory trees in both stressed F-Area sites that would reduce light availability to understory plants. No threatened or endangered plant species were found in the areas sampled. 40 refs., 4 figs., 8 tabs.

Loehle, C.

1990-11-01T23:59:59.000Z

47

Drop tests of the Three Mile Island knockout canister  

SciTech Connect (OSTI)

A type of Three Mile Island Unit 2 (TMI-2) defueling canister, called a ''knockout'' canister, was subjected to a series of drop tests at the Oak Ridge National Laboratory's Drop Test Facility. These tests were designed to confirm the structural integrity of internal fixed neutron poisons in support of a request for NRC licensing of this type of canister for the shipment of TMI-2 reactor fuel debris to the Idaho National Engineering Laboratory (INEL) for the Core Examination R and D Program. Work conducted at the Oak Ridge National Laboratory included (1) precise physical measurements of the internal poison rod configuration before assembly, (2) canister assembly and welding, (3) nondestructive examination (an initial hydrostatic pressure test and an x-ray profile of the internals before and after each drop test), (4) addition of a simulated fuel load, (5) instrumentation of the canister for each drop test, (6) fabrication of a cask simulation vessel with a developed and tested foam impact limiter, (7) use of refrigeration facilities to cool the canister to well below freezing prior to three of the drops, (8) recording the drop test with still, high-speed, and normal-speed photography, (9) recording the accelerometer measurements during impact, (10) disassembly and post-test examination with precise physical measurements, and (11) preparation of the final report.

Box, W.D.; Aaron, W.S.; Shappert, L.B.; Childress, P.C.; Quinn, G.J.; Smith, J.V.

1986-09-01T23:59:59.000Z

48

0 20 4010 Miles NOAA Harmful Algal Bloom Operational Forecast System  

E-Print Network [OSTI]

0 20 4010 Miles NOAA Harmful Algal Bloom Operational Forecast System Texas Forecast Region Maps to Sargent BCH NOAA Harmful Algal Bloom Operational Forecast System Texas Forecast Region Maps 0 5 102 Bloom Operational Forecast System Texas Forecast Region Maps 0 5 102.5 Miles West Bay #12;Aransas Bay

49

B3 Trains Problem Statement The train problem assumes a circular track 101 miles in circumference. The track is labeled clockwise in  

E-Print Network [OSTI]

B3 Trains 颅 Problem Statement The train problem assumes a circular track 101 miles in circumference be at the same spot as mile 0. One train starts at mile 0 going clockwise, another train starts at mile 100 going counterclockwise. The program prompts for speeds of each train in mph. The output is the mile (or fraction

Huth, Michael

50

Heatup of the TMI-2 (Three Mile Island Unit 2) lower head during core relocation  

SciTech Connect (OSTI)

According to current perceptions of the Three Mile Island Unit 2 (TMI-2) accident, corium largely relocated into the reactor vessel lower head at {approximately}224 min into the accident. Defueling examinations have revealed that the corium relocated from the molten core region to the lower head predominantly by way of drainage through the core former region (CFR) located between the vertical baffle plates immediately surrounding the fuel assemblies and the core barrel. An analysis has been carried out to assess the heatup of the reactor vessel lower head during the core relocation event, particularly the potential for a melting attack on the lower head wall and the in-core instrument nozzle penetration weldments. The analysis employed the THIRMAL computer code developed at Argonne National Laboratory (ANL) to predict the breakup and quenching or corium jets under film boiling conditions as well as the size distributions and quenching of the resultant molten droplets. The transient heatup and ablation of the vessel wall and penetration weldments due to impinging corium jets was calculated using the MISTI computer code.

Wang, S.K.; Sienicki, J.J.; Spencer, B.W. (Argonne National Laboratory, IL (USA))

1989-11-01T23:59:59.000Z

51

Historical summary of the Three Mile Island Unit 2 core debris transportation campaign  

SciTech Connect (OSTI)

Transport of the damaged core materials from the Unit 2 reactor of the Three Mile Island Nuclear Power Station (TMI-2) to the Idaho National Engineering Laboratory (INEL) for examination and storage presented many technical and institutional challenges, including assessing the ability to transport the damaged core; removing and packaging core debris in ways suitable for transport; developing a transport package that could both meet Federal regulations and interface with the facilities at TMI-2 and the INEL; and developing a transport plan, support logistics, and public communications channels suited to the task. This report is a historical summary of how the US Department of Energy addressed those challenges and transported, received, and stored the TMI-2 core debris at the INEL. Subjects discussed include preparations for transport, loading at TMI-2, institutional issues, transport operations, receipt and storage at the INEL, governmental inquiries/investigations, and lessons learned. Because of public attention focused on the TMI-2 Core Debris Transport Program, the exchange of information between the program and public was extensive. This exchange is a focus for parts of this report to explain why various operations were conducted as they were and why certain technical approaches were employed. And, because of that exchange, the program may have contributed to a better public understanding of such actions and may contribute to planning and execution of similar future actions.

Schmitt, R.C.; Tyacke, M.J. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Quinn, G.J. [Wastren, Inc., Germantown, MD (United States)

1993-03-01T23:59:59.000Z

52

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development  

Broader source: Energy.gov [DOE]

51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

53

960 x 932 km (576 x 559.2 miles) As big across as Texas  

E-Print Network [OSTI]

of Liberty! 25143 Itokowa 0.54 x 0.27 x .21 km (0.324 x 0.162 x 0.126 miles) size of the Golden Gate Bridge

Waliser, Duane E.

54

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

55

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

56

Autonomous personal vehicle for the first- and last-mile transportation services  

E-Print Network [OSTI]

This paper describes an autonomous vehicle testbed that aims at providing the first- and last- mile transportation services. The vehicle mainly operates in a crowded urban environment whose features can be extracted a ...

Chong, Z. J.

57

1982 worldwide pipeline construction will top 21,900 miles, $9. 5 billion  

SciTech Connect (OSTI)

Reports that pipeline construction slowed slightly in 1982 because of lowered economic activity worldwide, with an upturn forecast for 1983. Explains that need for new pipelines to transport increasing amounts of oil and gas energy now being discovered, plus use of pipelines to transport other commodities in increasing amounts, has created a backlog of demand for facilities. Indicates that commodities suited for pipeline transport and getting consideration include crude oil; refined products; natural gas liquids; LPG; coal slurries; carbon dioxide (used for enhanced oil recovery); chemicals such as ammonia, ethane, ethylene, and similar petrochemical feedstocks; industrial gases such as oxygen, nitrogen; and solids slurries such as ores, wood chips, and other non-soluble minerals, even items such as wood chips and wood pulp for paper-making. Reveals that there are 10,396 miles of coal slurry pipeline planned for the US and 500 miles in Canada. Major US projects underway in the gas pipeline field include the 797-mile, 36-in. Trailblazer system in Nebraska, Wyoming, Colorado, and Utah. Products/ LPG/NGL pipelines underway include 105 miles of dual 4 and 6-in. line in Kansas. Crude pipeline activity includes 100 miles of 12-in. in California and 80 miles of 4 thru 40-in. in Alaska on the North Slope. Updates plans in Canada, Scotland, Denmark, Ireland, France, the Middle East, Australia, Southeast Asia, Mexico, South America and the USSR.

Hall, D.

1982-07-01T23:59:59.000Z

58

Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint  

SciTech Connect (OSTI)

Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

2011-01-01T23:59:59.000Z

59

Facebook, Twitter and Google Plus for Breaking News: Is there a winner? Miles Osborne  

E-Print Network [OSTI]

Facebook, Twitter and Google Plus for Breaking News: Is there a winner? Miles Osborne School Media have be- gun to carry news. Here we examine how Facebook, Google Plus and Twitter report Facebook or Google Plus. Face- book and Google Plus largely repost newswire stories and their main research

Osborne, Miles

60

Modeling the Last Mile of the Smart Grid G.A. Pagani  

E-Print Network [OSTI]

Modeling the Last Mile of the Smart Grid G.A. Pagani Johann Bernoulli Institute of Mathematics in the grid and allowing for micro-production to be part of the smart grid. Such changes will have a major- archical, unidirectional and capillary, though the new smart grid scenario calls for an infrastructure

Aiello, Marco

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Crisis contained, The Department of Energy at Three Mile Island: a history  

SciTech Connect (OSTI)

An account is given of the response of US DOE to the Three Mile Island-2 accident on March 28, 1979. The accident is treated as though it was a military battle. A synoptic chronologgy of the accident events and of DOE and other responses is included. (DLC)

Cantelon, P L; Williams, R C

1980-12-01T23:59:59.000Z

62

Answers to frequently asked questions about cleanup activities at Three Mile Island, Unit 2. Public information report  

SciTech Connect (OSTI)

The document presents answers to frequently asked questions about plans for cleanup and decontamination activities at Three Mile Island, Unit 2. Answers to the questions asked are based on information in the NRC 'Draft Programmatic Environmental Impact Statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979, accident, Three Mile Island Nuclear Station, Unit 2,' NUREG-0683.

Not Available

1980-09-01T23:59:59.000Z

63

Robin Miles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStories 禄SubmitterJ. NorbyN. Compton (1995)RobertV.Robin

64

Greater commitment needed to solve continuing problems at Three Mile Island. Report to the Congress  

SciTech Connect (OSTI)

The Nation's first major accident at a commercial nuclear-powered electricity generating station occurred at Three Mile Island over 2 years ago, yet the resolution of the resultant problems is still subject to regulatory and financial uncertainty. Consequently, little progress has been made to clean up the damaged facility or alleviate the extreme financial stress placed upon its owners. The remedies required to resolve the continuing problems at Three Mile Island will require unprecedented coordination and commitment by Federal and State regulatory bodies, the electric utility industry, the financial community, and the owners of the damaged facility. To safeguard against similar problems in the future, the Nuclear Regulatory Commission should develop accident recovery guidelines and ensure that increased property insurance coverage is available for nuclear facilities.

Not Available

1981-08-26T23:59:59.000Z

65

Criticality prevention during postaccident decontamination of TMI-2 (Three Mile Island Unit 2) plant systems  

SciTech Connect (OSTI)

Following the accident at Three Mile Island Unit 2 (TMI-2), the likelihood of a criticality outside of the reactor coolant system (RCS) during the plant cleanup was very small. Given the consequence of any possible critical event in the TMI-2 systems, However, it was always necessary to ensure that all steps were taken to prevent criticality. Therefore, engineered controls were developed to ensure that decontamination of plant systems containing fuel material could be conducted in a manner that precluded criticality.

Palau, G. L.

1988-01-01T23:59:59.000Z

66

Answers to questions about updated estimates of occupational radiation doses at Three Mile Island, Unit 2  

SciTech Connect (OSTI)

The purpose of this question and answer report is to provide a clear, easy-to-understand explanation of revised radiation dose estimates which workers are likely to receive over the course of the cleanup at Three Mile Island, Unit 2, and of the possible health consequences to workers of these new estimates. We will focus primarily on occupational dose, although pertinent questions about public health and safety will also be answered.

Not Available

1983-12-01T23:59:59.000Z

67

The determination of settling velocities for sewage sludge disposed at 106-Mile Site  

E-Print Network [OSTI]

THE DBTERMZNATZON OF SETTLING VELOCZTZES FOR SEWAGE SLUDGE DZSPOSED AT 106-MILE SITE A Thesis by DANIEL SAUL HERNANDEZ Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of requirements for the degree... of MASTER OF SCIENCE December 1991 Major Subject: Civil Engineering THB DETERMZNATZON OF SBTTLZNG VELOCZTZES FOR SEWAGE SLUDGE DZSPOSBD AT 106-MZLE SZTB A Thesis by DANIEL SAUL HERNANDEZ Approved as to style and content by: James S. Bonner '(Chair...

Hernandez, Daniel Saul

1991-01-01T23:59:59.000Z

68

Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery  

SciTech Connect (OSTI)

Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japan抯 Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

Layne Pincock; Wendell Hintze; Dr. Koji Shirai

2012-07-01T23:59:59.000Z

69

Results of the radiological survey at Two Mile Creek, Tonawanda, New York (TNY002)  

SciTech Connect (OSTI)

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at Two Mile Creek, Tonawanda, New York. The survey was performed in November 1991 and May 1996. The purpose of the survey was to determine if radioactive materials from work performed under government contract at the Linde Air Products Division of Union Carbide Corporation, Tonawanda, New York, had been transported into the creek. The survey included a surface gamma scan in accessible areas near the creek and the collection of soil, sediment, and core samples for radionuclide analyses. Survey results indicate that no significant material originating at the Linde plant is presently in the creek. Three of the 1991 soil sample locations on the creek bank and one near the lake contained slightly elevated concentrations of {sup 238}U with radionuclide distributions similar to that found in materials resulting from former processing activities at the Linde site.

Murray, M.E.; Rodriguez, R.E.; Uziel, M.S.

1997-08-01T23:59:59.000Z

70

Greater commitment needed to solve continuing problems at Three Mile Island  

SciTech Connect (OSTI)

This report examines several key issues involving the financial status of the General Public Utilities Corporation, the need for and source of funding to clean up the damaged nuclear reactor at Three Mile Island, and the prospects for continued reliable electric service to Pennsylvania and New Jersey consumers. It also examines bankruptcy as a solution to the utilities' financial problems, and the need for (1) increased property damage insurance coverage on nuclear reactors, and (2) an improved regulatory environment for nuclear accident recovery efforts. The role of the Federal Government in the accident recovery effort and Congressional support for a Federal research and development program are discussed. It is recommended that the Nuclear Regulatory Commission follow the expansion of property insurance coverage for nuclear units by the private sector and develop guidelines to expedite any future accident recovery efforts.

Not Available

1981-08-26T23:59:59.000Z

71

Analysis of the Three Mile Island Unit 2 hydrogen burn. Volume 4  

SciTech Connect (OSTI)

As a basis for the analysis of the hydrogen burn which occurred in the Three Mile Island Containment on March 28, 1979, a study of recorded temperatures and pressures was made. Long-term temperature information was obtained from the multipoint temperature recorder which shows 12 containment atmosphere temperatures plotted every 6 min. The containment atmosphere pressure recorder provided excellent long- and short-term pressure information. Short-term information was obtained from the multiplex record of 24 channels of data, recorded every 3 sec, and the alarm printer record which shows status change events and prints out temperatures, pressures, and the time of the events. The timing of these four data recording systems was correlated and pertinent data were tabulated, analyzed, and plotted to show average containment temperature and pressure versus time. Photographs and videotapes of the containment entries provided qualitative burn information.

Henrie, J.O.; Postma, A.K.

1983-03-01T23:59:59.000Z

72

Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon- Dataset  

Broader source: Energy.gov [DOE]

Excel file with dataset for Fact #848: November 24, 2014 Nearly Three-Fourths of New Cars have Fuel Economy above 25 Miles per Gallon

73

EA-1985: Virginia Offshore Wind Technology Advancement Project (VOWTAP), 24 nautical miles offshore of Virginia Beach, Virginia  

Broader source: Energy.gov [DOE]

DOE is proposing to fund Virginia Electric and Power Company's Virginia Offshore Wind Technology Advancement Project (VOWTAP). The proposed VOWTAP project consists of design, construction and operation of a 12 megawatt offshore wind facility located approximately 24 nautical miles off the coast of Virginia Beach, VA on the Outer Continental Shelf.

74

Lessons learned from the Three Mile Island Unit 2 Advisory Panel  

SciTech Connect (OSTI)

In response to public concern about the cleanup of the Three Mile Island, Unit 2 (TMI-2) facility after an accident on March 28, 1979 involving a loss of reactor coolant and subsequent damage to the reactor fuel, twelve citizens were asked to serve on an independent Advisory Panel to consult with the Nuclear Regulatory Commission (NRC) on the decontamination and cleanup of the facility. The panel met 78 times over a period of thirteen years, holding public meetings in the vicinity of TMI-2 and meeting regularly with NRC Commissioners in Washington, DC. This report describes the results of a project designed to identify and describe the lessons learned from the Advisory Panel and place those lessons in the context of what we generally know about citizen advisory groups. A summary of the empirical literature on citizen advisory panels is followed by a brief history of the TMI-2 Advisory Panel. The body of the report contains the analysis of the lessons learned, preliminary conclusions about the effectiveness of the Panel, and implications for the NRC in the use of advisory panels. Data for the report include meeting transcripts and interviews with past and present Panel participants.

Lach, D.; Bolton, P.; Durbin, N. [Battelle Seattle Research Center, WA (United States); Harty, R. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

75

Evaluation of special safety issues associated with handling the Three Mile Island Unit 2 core debris  

SciTech Connect (OSTI)

This document reports the results of recent tests and analyses evaluating safety concerns relating to Three Mile Island Unit 2 (TMI-2) core debris pyrophoricity, radiolytic hydrogen and oxygen, and the potential for steam generation in shipping canisters during a fire. Recommendations drawn from these results include the following: (1) hydrogen-oxygen recombiners should be installed in each core debris canister, (2) water should be removed from each canister by drip drying (no vacuum pumping is required), (3) the maximum weight of the loaded, dewatered canisters and the minimum volume of gas/vapor in each canister should be controlled and measured by weighting before and after dewatering, (4) a cover gas of approximately two atmospheres of argon should be added to each canister, (5) each canister should be weighed and pressure checked prior to shipping, (6) the shipping cask should be designed to limit the temperature of the canister contents after the standard hypothetical accident (fire) such that the design pressure of the canister/cask will not be exceeded, (7) provisions should be made for canister venting during long-term storage and for cask venting in the event of an overpressure condition resulting from an ''extended'' fire, and (8) some pyrophoricity testing of samples taken during defueling should be conducted to assure adequate safety-related information during canister opening.

Henrie, J.O.; Appel, J.N.

1985-06-01T23:59:59.000Z

76

A slow comeback (clean up at the damaged Three Mile Island Unit 2 reactor)  

SciTech Connect (OSTI)

This article reports on the progress that has been made in cleaning up the damaged Three Mile Island Unit 2 reactor, with radioactive debris present not only in the reactor core, but throughout the primary cooling system. Delays in the cleanup operation have been caused by extraordinary technical challenges, regulatory procedures, and funding shortages. The initial stabilization and decontamination of the containment building, which included the removal and processing of the radioactive water, are essentially complete. Reactor disassembly and defueling have yet to begin. The NRC has reported that radiation doses at Unit 2 since the accident have been lower than those experienced at operating reactors, but the estimates for the collective radiation exposure for the work force have recently increased. The NRC has proposed that if robotic devices are used in the defueling and decontamination processes, work-force exposure could be cut by more than half. The projected completion rates for defueling Unit 2 and decontaminating the containment building now range from 1990 to past the year 2000. A five-part inspection program was conducted that included the use of video and sonar probes inside the reactor vessel, and the gathering of debris samples from the core.

Adam, J.A.

1984-04-01T23:59:59.000Z

77

Evaluation of the Three Mile Island Unit 2 reactor building decontamination process  

SciTech Connect (OSTI)

Decontamination activities from the cleanup of the Three Mile Island Unit 2 Reactor Building are generating a variety of waste streams. Solid wastes being disposed of in commercial shallow land burial include trash and rubbish, ion-exchange resins (Epicor-II) and strippable coatings. The radwaste streams arising from cleanup activities currently under way are characterized and classified under the waste classification scheme of 10 CFR Part 61. It appears that much of the Epicor-II ion-exchange resin being disposed of in commerical land burial will be Class B and require stabilization if current radionuclide loading practices continue to be followed. Some of the trash and rubbish from the cleanup of the reactor building so far would be Class B. Strippable coatings being used at TMI-2 were tested for leachability of radionuclides and chelating agents, thermal stability, radiation stability, stability under immersion and biodegradability. Actual coating samples from reactor building decontamination testing were evaluated for radionuclide leaching and biodegradation.

Dougherty, D.; Adams, J. W.

1983-08-01T23:59:59.000Z

78

Estimating commercial truck VMT (vehicle miles of travel) of interstate motor carriers: Data evaluation  

SciTech Connect (OSTI)

This memorandum summarizes the evaluation results of six data sources in terms of their ability to estimate the number of commercial trucks operating in interstate commerce and their vehicle miles of travel (VMT) by carrier type and by state. The six data sources are: (1) Truck Inventory and Use Survey (TIUS) from the Bureau of the Census, (2) nationwide truck activity and commodity survey (NTACS) from the Bureau of the Census, (3) National Truck Trip Information Survey (NTTIS) from the University of Michigan Transportation Research Institute (UMTRI), (4) highway performance monitoring system (HPMS) from the Federal Highway Administration (FHWA), Department of Transportation, (5) state fuel tax reports from each individual state and the international fuel tax agreement (IFTA), and (6) International Registration Plan (IRP) of the American Association of Motor Vehicle Administrators (AAMVA). TIUS, NTACS, and NTTIS are designed to provide data on the physical and operational characteristics of the Nation's truck population (or sub-population); HPMS is implemented to collect information on the physical and usage characteristics of various highway systems; and state fuel tax reports and IRP are tax-oriented registrations. 16 figs., 13 tabs.

Hu, P.S.; Wright, T.; Miaou, Shaw-Pin; Beal, D.J.; Davis, S.C. (Oak Ridge National Lab., TN (USA); Tennessee Univ., Knoxville, TN (USA))

1989-11-01T23:59:59.000Z

79

Methodology for Estimating ton-Miles of Goods Movements for U.S. Freight Mulitimodal Network System  

SciTech Connect (OSTI)

Ton-miles is a commonly used measure of freight transportation output. Estimation of ton-miles in the U.S. transportation system requires freight flow data at disaggregated level (either by link flow, path flows or origin-destination flows between small geographic areas). However, the sheer magnitude of the freight data system as well as industrial confidentiality concerns in Census survey, limit the freight data which is made available to the public. Through the years, the Center for Transportation Analysis (CTA) of the Oak Ridge National Laboratory (ORNL) has been working in the development of comprehensive national and regional freight databases and network flow models. One of the main products of this effort is the Freight Analysis Framework (FAF), a public database released by the ORNL. FAF provides to the general public a multidimensional matrix of freight flows (weight and dollar value) on the U.S. transportation system between states, major metropolitan areas, and remainder of states. Recently, the CTA research team has developed a methodology to estimate ton-miles by mode of transportation between the 2007 FAF regions. This paper describes the data disaggregation methodology. The method relies on the estimation of disaggregation factors that are related to measures of production, attractiveness and average shipments distances by mode service. Production and attractiveness of counties are captured by the total employment payroll. Likely mileages for shipments between counties are calculated by using a geographic database, i.e. the CTA multimodal network system. Results of validation experiments demonstrate the validity of the method. Moreover, 2007 FAF ton-miles estimates are consistent with the major freight data programs for rail and water movements.

Oliveira Neto, Francisco Moraes [ORNL] [ORNL; Chin, Shih-Miao [ORNL] [ORNL; Hwang, Ho-Ling [ORNL] [ORNL

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

A review of "Indian Ink: Script and Print in the Making of the English East India Company" by Miles Ogborn  

E-Print Network [OSTI]

, Indian Ink: Script and Print in the Making of the English East India Company. Chicago and London: The University of Chicago Press, 2007. xiii + 318 pp. + 22 illus. $40.00. Review by TILLMAN W. NECHTMAN, SKIDMORE COLLEGE. The India Office Records... Company (EIC) and the English/British empire in South Asia. Miles Ogborn?s impressive new book, Indian Ink: Script and Print in the Making of the English East India Company, approaches this same archive from an important new direction. Rather than reading...

Nechtman, Tillman W.

2008-01-01T23:59:59.000Z

82

Characterization of the Three Mile Island Unit-2 reactor building atmosphere prior to the reactor building purge  

SciTech Connect (OSTI)

The Three Mile Island Unit-2 reactor building atmosphere was sampled prior to the reactor building purge. Samples of the containment atmosphere were obtained using specialized sampling equipment installed through penetration R-626 at the 358-foot (109-meter) level of the TMI-2 reactor building. The samples were subsequently analyzed for radionuclide concentration and for gaseous molecular components (O/sub 2/, N/sub 2/, etc.) by two independent laboratories at the Idaho National Engineering Laboratory (INEL). The sampling procedures, analysis methods, and results are summarized.

Hartwell, J.K.; Mandler, J.W.; Duce, S.W.; Motes, B.G.

1981-05-01T23:59:59.000Z

83

Review of Destructive Assay Methods for Nuclear Materials Characterization from the Three Mile Island (TMI) Fuel Debris  

SciTech Connect (OSTI)

This report provides a summary of the literature review that was performed and based on previous work performed at the Idaho National Laboratory studying the Three Mile Island 2 (TMI-2) nuclear reactor accident, specifically the melted fuel debris. The purpose of the literature review was to document prior published work that supports the feasibility of the analytical techniques that were developed to provide quantitative results of the make-up of the fuel and reactor component debris located inside and outside the containment. The quantitative analysis provides a technique to perform nuclear fuel accountancy measurements

Carla J. Miller

2013-09-01T23:59:59.000Z

84

An Econometric Analysis of the Elasticity of Vehicle Travel with Respect to Fuel Cost per Mile Using RTEC Survey Data  

SciTech Connect (OSTI)

This paper presents the results of econometric estimation of the ''rebound effect'' for household vehicle travel in the United States based on a comprehensive analysis of survey data collected by the U.S. Energy Information Administration (EIA) at approximately three-year intervals over a 15-year period. The rebound effect is defined as the percent change in vehicle travel for a percent change in fuel economy. It summarizes the tendency to ''take back'' potential energy savings due to fuel economy improvements in the form of increased vehicle travel. Separate vehicles use models were estimated for one-, two-, three-, four-, and five-vehicle households. The results are consistent with the consensus of recently published estimates based on national or state-level data, which show a long-run rebound effect of about +0.2 (a ten percent increase in fuel economy, all else equal, would produce roughly a two percent increase in vehicle travel and an eight percent reduction in fuel use). The hypothesis that vehicle travel responds equally to changes in fuel cost-per-mile whether caused by changes in fuel economy or fuel price per gallon could not be rejected. Recognizing the interdependency in survey data among miles of travel, fuel economy and price paid for fuel for a particular vehicle turns out to be crucial to obtaining meaningful results.

Greene, D.L.; Kahn, J.; Gibson, R.

1999-03-01T23:59:59.000Z

85

A study of post-thermal recovery of the macroinvertebrate community of Four Mile Creek, June 1985--September 1987. [Savannah River Plant  

SciTech Connect (OSTI)

Four Mile Creek is one of several streams at the Savannah River Site which has received thermal effluents ({le}70{degrees}C water) from nuclear production operations. From 1955--mid-1985, Four Mile Creek received thermal effluent from C-Reactor as well as non-thermal discharges from F and H Separation Areas. Total discharges from all of these facilities was about ten times higher than the natural flow of the creek (Firth et al. 1986). All water being discharged into Four Mile Creek was originally pumped from the Savannah River. This study reports the results of the artificial substrate sampling of macroinvertebrate communities of Four Mile Creek from June 1985 through September 1987, when sampling was terminated. Macroinvertebrate taxa richness, densities, and biomass data from this study are compared to Four Mile data collected prior to the shutdown of C-Reactor (Kondratieff and Kondratieff 1985 and Firth et al. 1986), and to comparable macroinvertebrate data from other Savannah River Site streams. 29 refs., 11 figs., 4 tabs.

Lauritsen, D.; Starkel, W.; Specht, W.

1989-11-01T23:59:59.000Z

86

Degraded voltage resulting in non-safety UPS failure at Nine Mile Point Unit 2 August 13, 1991  

SciTech Connect (OSTI)

At approximately 5:48 a.m. on august 13, 1991, phase B of the main stepup transformer of Niagara Mohawk's Nine Mile Point Unit 2 (NMP2) Nuclear Power Plant experienced a failure resulting in degraded voltage in phase B of the electrical AC distribution system. The duration of the degraded voltage lasted 12 cycles, the time required to clear the fault and to fast transfer the house loads to alternate offsite sources. The protective relaying schemes accomplished this without any abnormalities. This paper reports that due to the nature of the fault and its protection, the turbine tripped, resulting in an automatic reactor scram. However, during the fast transfer under degraded voltage conditions, five non-0safety related Uninterruptible Power Supplies (UPS) tripped; these UPS's were supplied by Exide Electronics. The tripping of these UPS's resulted in the loss of plant process computers, Control Room annunciation, and a significant portion of non-safety related instrumentation and control circuits.

Julka, A.K. (Niagara Mohawk Power Corp. (United States))

1992-08-01T23:59:59.000Z

87

Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991  

SciTech Connect (OSTI)

On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

Not Available

1991-10-01T23:59:59.000Z

88

Disposal demonstration of a high integrity container (HIC) containing an EPICOR-II prefilter from Three Mile Island  

SciTech Connect (OSTI)

A high integrity container (HIC) was developed, tested, and certified for use in disposing of unusual low-level radioactive waste from Three Mile Island Unit 2 (TMI-2). The work was coordinated by EG and G Idaho, Inc. and funded by the US Department of Energy. A disposal demonstration using an HIC containing an EPICOR-II prefilter from TMI-2 was completed at the commercial disposal facility in the State of Washington. A Certification of Compliance was issued by the Department of Social and Health Services of the State of Washington to use the HIC in disposing of up to 50 EPICOR-II prefilters. That Certification of Compliance was issued after rigorous review of the HIC design and test program by the State and by the US Nuclear Regulatory Commission. This report describes the processes of loading, transporting, and disposing of the demonstration HIC and briefly describes the design, testing, and approval effort leading up to the demonstration.

McConnell, J.W. Jr.; Tyacke, M.J.; Schmitt, R.C.; Reno, H.W.

1985-02-01T23:59:59.000Z

89

Evaluation of nuclear facility decommissioning projects: Summary status report: Three Mile Island Unit 2. Radioactive waste and laundry shipments  

SciTech Connect (OSTI)

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 through April 19, 1987. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Haffner, D. R.

1988-06-01T23:59:59.000Z

90

Transporting TMI-2 (Three Mile Island Unit 2) core debris to INEL: Public safety and public response  

SciTech Connect (OSTI)

This paper describes the approach taken by the US Department of Energy (DOE) to ensure that public safety is maintained during transport of core debris from the Unit-2 reactor at the Three Mile Island Nuclear Power Station near Harrisburg, PA, to the Idaho National Engineering Laboratory near Idaho Falls, ID. It provides up-to-date information about public response to the transport action and discusses DOE's position on several institutional issues. The authors advise that planners of future transport operations be prepared for a multitude of comments from all levels of federal, state, and local governments, special interest groups, and private citizens. They also advise planners to keep meticulous records concerning all informational transactions.

Schmitt, R.C.; Reno, H.W.; Young, W.R.; Hamric, J.P.

1987-01-01T23:59:59.000Z

91

Directions to Virginia Tech Chemistry Department from Interstate 81 Follow I-81 to Exit 118-B. Follow US 460 West about 6 miles. Upon entering Blacksburg, do NOT  

E-Print Network [OSTI]

Directions to Virginia Tech Chemistry Department from Interstate 81 Follow I-81 to Exit 118-B. Follow US 460 West about 6 miles. Upon entering Blacksburg, do NOT use "Business" US 460 which is also called Main Street. Bear left and stay on the freeway. The first traffic light on US 460 will be Virginia

Crawford, T. Daniel

92

Vehicle engine use when no longer in transit; exceptions -Vehicle idling gets zero miles per gallon; unnecessary idling wastes fuel and pollutes.  

E-Print Network [OSTI]

Vehicle engine use when no longer in transit; exceptions - Vehicle idling gets zero miles per, no University vehicle or piece of equipment is to be idled in a non-emergency situation. The operator of the vehicle/equipment is to turn-off the unit and the keys are to be removed from the ignition. EXEMPTIONS

Powers, Robert

93

WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write  

E-Print Network [OSTI]

WORD PROBLEMS 1. Suppose your car gets 25 miles per gallon of gasoline and the price of gas is $3.50 per gallon. Write your monthly gasoline cost C in terms of the distance D that you travel each month

Koban, Nic

94

UMore Park Update October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast  

E-Print Network [OSTI]

UMore Park Update 颅 October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast of the Twin Cities at the suburban presentation set for October 11 The UMore Development LLC will provide an update on UMore Park activities

Amin, S. Massoud

95

Heat removal aspects of Liquid Metal Fast Breeder Reactor safety in light of the Three Mile Island incident  

SciTech Connect (OSTI)

The safety aspects of the Liquid Metal Fast Breeder Reactor (LMFBR) loop design are compared with those of the Light Water Reactor (LWR), in light of the Three Mile Island (TMI) incident. The events at TMI are briefly described, the fundamental differences between the LWR water coolant and the LMFBR sodium coolant are presented, and the design of analogous LMFBR safety systems under similar events as those at TMI is discussed. A preliminary qualitative evaluation of a TMI-equivalent accident for an LMFBR indicates that there is likely to be: (1) negligible pressure transients in the primary loop, (2) no core damage, (3) isolation of the incident at the steam generator, and (4) no radiation release to the environment, except a negligible amount of tritium from the secondary sodium. Furthermore, with the absence of the ECCS (Emergency Core Cooling System), pressurizer, and other pressure-related components in the LMFBR design, operator action for a LMFBR should be much simpler in dealing with the coolant upset condition and the decay heat removal problems.

Victor, H.R.; Graf, D.G.

1980-12-01T23:59:59.000Z

96

The legacy of Three Mile Island -- Implications for today`s U.S. Department of Energy challenges  

SciTech Connect (OSTI)

Over the course of the 16 year period following the accident at Three Mile Island-Unit-2, much has been learned and volumes have been written regarding the cause and massive cleanup activities of the incident. Because of these lessons learned, important changes have been made and the US commercial nuclear industry is safer and more reliable as a result. It is important to recognize that two major sources of information emerged from this event. First and foremost were the important safety issues that required immediate answers and the addition of the modifications to plants that these answers generated. Second and of considerable significance to the US Department of Energy (US DOE) in today`s post-cold war environment are the frequently hard-won lessons involved with the recovery, clean-up, and defueling of TMI-2 and its unprecedented transition into long-term, monitored storage. While the commercial industry, regulatory authorities, and the public saw an immediate need for instituting the important safety lessons from TMI-2, these new systems, improved training and operating practices have paid off in increased reliability and extended operations. However, there was no such immediate application for the second source of information, that being the application of the deactivation and long-term storage technology learned at TMI-2 to a current condition. The tasks and methods used in the TMI-2 recovery have strong parallels in the present-day DOE cleanup program.

Williams, M.S.; Conaway, W.T.; Coe, R.P. [General Public Utilities Nuclear, Parsippany, NJ (United States)

1996-11-01T23:59:59.000Z

97

The legacy of Three Mile Island: Implications for today`s U.S. Department of Energy challenges  

SciTech Connect (OSTI)

Over the course of the 16 year period following the accident at Three Mile Island-Unit-2, much has been learned and volumes have been written regarding the cause and massive cleanup activities of the incident. Because of these Lessons Learned, important changes have been made and the US commercial nuclear industry is safer and more reliable as a result. It is important to recognize that two major sources of information emerged from this event. First and foremost were the important safety issues that required immediate answers and the addition of the modifications to plants that these answers generated. Second and of considerable significance to the US Department of energy (US DOE) in today`s post-cold war environment are the frequently hard-won lessons involved with the recovery, clean-up, and defueling of TMI-2 and its unprecedented transition into long-term, monitored storage. While the commercial industry, regulatory authorities, and the public saw an immediate need for instituting the important safety lessons from TMI-2, these new systems, improved training and operating practices have paid off in increased reliability and extended operations. However, there was no such immediate application for the second source of information, that being the application of the deactivation and long-term storage technology learned at TMI-2 to a current condition. The tasks and methods used in the TMI-2 recovery have strong parallels in the present-day DOE cleanup program.

Coe, R.P.; Conaway, W.T.; Williams, M.S. [General Public Utilities Nuclear, Parsippany, NJ (United States)

1996-12-31T23:59:59.000Z

98

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor defueling and disassembly. Summary status report. Volume 3  

SciTech Connect (OSTI)

This document summarizes information relating to the preparations for defueling the Three Mile Island Unit 2 (TMI-2) reactor and disassembly activities being performed concurrently with decontamination of the facility. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data sysem which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during the period of April 23, 1979 to April 16, 1985, in the completion of activities related to preparation for reactor defueling. Support activities conducted outside of radiation areas are not included within the scope of this report. Computerized reports included in this document are: A chronological summary listing work performed for the period; and summary reports for each major task undertaken in connection with the specific scope of this report. Presented in chronological order for the referenced time period. Manually-assembled table summaries are included for: Labor and exposures by department; and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

99

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor building decontamination. Summary status report. Volume 2  

SciTech Connect (OSTI)

This document summarizes information relating to decontamination of the Three Mile Island Unit 2 (TMI-2) reactor building. The report covers activities for the period of June 1, 1979 through March 29, 1985. The data collected from activity reports, reactor containment entry records, and other sources were entered into a computerized data system which permits extraction/manipulation of specific information which can be used in planning for recovery from an accident similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during decontamination of the reactor building. Support activities conducted outside of radiation areas are excluded from the scope of this report. Computerized reports included in this document are: a chronological summary listing work performed relating to reactor building decontamination for the period specified; and summary reports for each major task during the period. Each task summary is listed in chronological order for zone entry and subtotaled for the number of personnel entries, exposures, and man-hours. Manually-assembled table summaries are included for: labor and exposures by department and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

100

miles-99.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial Carbon CaptureFY08 Joint JOULE J. NoremI Prepared by. ., .

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Modal shifts in short-haul passenger travel and the consequent energy impacts. [Intercity travel under 500 miles  

SciTech Connect (OSTI)

A study was performed to evaluate the impacts of strategies to effect modal shifts in short-haul passenger travel (defined herein as intercity travel under 500 miles) from energy-intensive modes to those modes that are less energy-intensive. A series of individual strategies, ranging from incentives to the less energy-intensive modes (bus, rail) to penalties to the more energy-intensive modes (auto, air) was examined to determine energy saved and policy implications relative to strategy implementation. The most effective of the individual strategies were then combined in all permutations, and the analysis was repeated. As part of the analytical process, effects of factors other than energy (user cost and time, emissions, government subsidy, and travel fatailities) were examined in a benefit/cost analysis. Finally, energy savings, benefit/cost impacts, implementation considerations, and policy implications were evaluated to arrive at conclusions as to the effectiveness of the more-influential strategies and to the overall effectiveness of induced modal shifts. The principal conclusion of the study is that the maximum 1980 energy saving that might be realized by modal shifts, discounting the concurrent effects of demand suppression and improvement of mode efficiency, is approximately 83 x 10/sup 12/ Btu (46,500 bbl gasoline per day), 3.8% of the total projected 1980 energy consumption in the short-haul transportation sector and 0.23% of the total US petroleum use. It was also concluded that strategies to achieve these small savings by modal shifts would result in significant economic, social, and business disruptions.

Not Available

1980-03-01T23:59:59.000Z

102

Revisiting Insights from Three Mile Island Unit 2 Postaccident Examinations and Evaluations in View of the Fukushima Daiichi Accident  

SciTech Connect (OSTI)

The Three Mile Island Unit 2 (TMI-2) accident, which occurred on March 28, 1979, led industry and regulators to enhance strategies to protect against severe accidents in commercial nuclear power plants. Investigations in the years after the accident concluded that at least 45% of the core had melted and that nearly 19 tonnes of the core material had relocated to the lower head. Postaccident examinations indicate that about half of that material formed a solid layer near the lower head and above it was a layer of fragmented rubble. As discussed in this paper, numerous insights related to pressurized water reactor accident progression were gained from postaccident evaluations of debris, reactor pressure vessel (RPV) specimens, and nozzles taken from the RPV. In addition, information gleaned from TMI-2 specimen evaluations and available data from plant instrumentation were used to improve severe accident simulation models that form the technical basis for reactor safety evaluations. Finally, the TMI-2 accident led the nuclear community to dedicate considerable effort toward understanding severe accident phenomenology as well as the potential for containment failure. Because available data suggest that significant amounts of fuel heated to temperatures near melting, the events at Fukushima Daiichi Units 1, 2, and 3 offer an unexpected opportunity to gain similar understanding about boiling water reactor accident progression. To increase the international benefit from such an endeavor, we recommend that an international effort be initiated to (a) prioritize data needs; (b) identify techniques, samples, and sample evaluations needed to address each information need; and (c) help finance acquisition of the required data and conduct of the analyses.

Joy Rempe; Mitchell Farmer; Michael Corradini; Larry Ott; Randall Gauntt; Dana Powers

2012-11-01T23:59:59.000Z

103

Scale-4 Analysis of Pressurized Water Reactor Critical Configurations: Volume 4-Three Mile Island Unit 1 Cycle 5  

SciTech Connect (OSTI)

The requirements of ANSI/ANS-8.1 specify that calculational methods for away-from-reactor criticality safety analyses be validated against experimental measurements. If credit is to be taken for the reduced reactivity of burned or spent fuel relative to its original ''fresh'' composition, it is necessary to benchmark computational methods used in determining such reactivity worth against spent fuel reactivity measurements. This report summarizes a portion of the ongoing effort to benchmark away-from-reactor criticality analysis methods using relevant and well-documented critical configurations from commercial pressurized water reactors. The analysis methodology utilized for all calculations in this report is based on the modules and data associated with the SCALE-4 code system. Isotopic densities for spent fuel assemblies in the core were calculated using the SCALE-4 SAS2H analytical sequence. The sources of data and the procedures for deriving SAS2H input parameters are described in detail. The SNIKR code family was used to extract the necessary isotopic densities from SAS2H results and to provide the data in the format required for SCALE criticality analysis modules. The CSASN analytical sequence in SCALE-4 was used to perform resonance processing of cross sections. The KENO V.a module of SCALE-4 was used to calculate the effective multiplication factor (k{sub eff}) for the critical configuration. The SCALE-4 27-group burnup library containing ENDF/B-IV (actinides) and ENDF/B-V (fission products) data was used for all calculations. This volume of the report documents a reactor critical calculation for GPU Nuclear Corporation's Three Mile Island Unit 1 (TMI-1) during hot, zero-power startup testing for the beginning of cycle 5. This unit and cycle were selected because of their relevance in spent fuel benchmark applications: (1) cycle 5 startup occurred after an especially long downtime of 6.6 years; and (2) the core consisted primarily (75%) of burned fuel, with all fresh fuel loaded on the core outer periphery. A k{sub eff} value of 0.9978 {+-} 0.0004 was obtained using two million neutron histories in the KENO V.a model. This result is close to the known critical k{sub eff} of 1.0 for the actual core and is consistent with other mixed-oxide criticality benchmarks. Thus this method is shown to be valid for spent fuel applications in burnup credit analyses.

DeHart, M.D.

1995-01-01T23:59:59.000Z

104

Funding for the food miles project was provided through Agriculture and Agri-Food Canada's Advancing Canadian Agriculture and Agri-Food (ACAAF) Program. In Nova Scotia the program is delivered by Agri-Futures Nova Scotia.  

E-Print Network [OSTI]

Funding for the food miles project was provided through Agriculture and Agri-Food Canada.................................................................... 7 Energy .................................................................................. 9 Self grown? With these two questions at the fore, combing through various statistics and reports

Peak, Derek

105

Rental rate includes liability insurance (LDW), vehicle licensing fees, unlimited roundtrip mileage; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in the  

E-Print Network [OSTI]

; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in setting up direct billing for your department, please click link below: http://www

Arnold, Jonathan

106

Final environmental impact statement for the construction and operation of an independent spent fuel storage installation to store the Three Mile Island Unit 2 spent fuel at the Idaho National Engineering and Environmental Laboratory. Docket Number 72-20  

SciTech Connect (OSTI)

This Final Environmental Impact Statement (FEIS) contains an assessment of the potential environmental impacts of the construction and operation of an Independent Spent Fuel Storage Installation (ISFSI) for the Three Mile Island Unit 2 (TMI-2) fuel debris at the Idaho National Engineering and Environmental laboratory (INEEL). US Department of Energy-Idaho Operations Office (DOE-ID) is proposing to design, construct, and operate at the Idaho Chemical Processing Plant (ICPP). The TMI-2 fuel debris would be removed from wet storage, transported to the ISFSI, and placed in storage modules on a concrete basemat. As part of its overall spent nuclear fuel (SNF) management program, the US DOE has prepared a final programmatic environmental impact statement (EIS) that provides an overview of the spent fuel management proposed for INEEL, including the construction and operation of the TMI-2 ISFSI. In addition, DOE-ID has prepared an environmental assessment (EA) to describe the environmental impacts associated with the stabilization of the storage pool and the construction/operation of the ISFSI at the ICPP. As provided in NRC`s NEPA procedures, a FEIS of another Federal agency may be adopted in whole or in part in accordance with the procedures outlined in 40 CFR 1506.3 of the regulations of the Council on Environmental Quality (CEQ). Under 40 CFR 1506.3(b), if the actions covered by the original EIS and the proposed action are substantially the same, the agency adopting another agency`s statement is not required to recirculate it except as a final statement. The NRC has determined that its proposed action is substantially the same as actions considered in DOE`s environmental documents referenced above and, therefore, has elected to adopt the DOE documents as the NRC FEIS.

NONE

1998-03-01T23:59:59.000Z

107

NUREG-1150 risk assessment methodology  

SciTech Connect (OSTI)

This paper describes the methodology developed in support of the US Nuclear Regulatory Commission's (NCR's) evaluation of severe accident risks in NUREG-1150. After the accident at Three Mile Island, Unit 2, the NRC initiated a sever accident research program to develop an improved understanding of severe accidents and to provide a second technical basis to support regulatory decisions in this area. A key product of this program is NUREG-1150, which provides estimates of risk for several nuclear reactors of different design. The principal technical analyses for NUREG-1150 were performed at Sandia National Labs. under the Severe Accident Risk Reduction Program and the Accident Sequence Evaluation Program. A major aspect of the work was the development of a methodology that improved upon previous full-scale probabilistic risk assessments (PRA) in several areas which are described.

Benjamin, A.S.; Amos, C.N.; Cunningham, M.A.; Murphy, J.A.

1987-01-01T23:59:59.000Z

108

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor coolant system and systems decontamination. Summary status report. Volume 1  

SciTech Connect (OSTI)

This document summarizes information relating to the decontamination and restoration of the Three Mile Island Unit 2 reactor coolant system and other plant systems. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data system which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced by the Three Mile Island Unit 2 on March 28, 1979. This report contains a summary of radiation exposures, manpower, and time spent in radiation areas during the referenced period. Support activities conducted outside of radiation areas are not included. Computer reports included are: A chronological listing of all activities related to decomtamination and restoration of the reactor coolant system and other plant systems for the period of April 5, 1979, through December 19, 1984; a summary of labor and exposures by department for the same time period; and summary reports for each major task undertaken in connection with this specific work scope during the referenced time period.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

109

NANA Geothermal Assessment Program Final Report  

SciTech Connect (OSTI)

In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

Jay Hermanson

2010-06-22T23:59:59.000Z

110

EA-1447: Final Environmental Assessment  

Broader source: Energy.gov [DOE]

Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico

111

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2. Radioactive waste and laundry shipments. Volume 9. Summary status report  

SciTech Connect (OSTI)

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 to May 5, 1985. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Miller, R. L.; Scotti, K. S.

1986-05-01T23:59:59.000Z

112

Preliminary Feasibility Assessment of Geologic Carbon Sequestration Potential for TVA's John Sevier and Kingston Power Plants  

SciTech Connect (OSTI)

This is a preliminary assessment of the potential for geologic carbon sequestration for the Tennessee Valley Authority's (TVA) John Sevier and Kingston power plants. The purpose of this assessment is to make a 'first cut' determination of whether there is sufficient potential for geologic carbon sequestration within 200 miles of the plants for TVA and Oak Ridge National Laboratory (ORNL) to proceed with a joint proposal for a larger project with a strong carbon management element. This assessment does not consider alternative technologies for carbon capture, but assumes the existence of a segregated CO{sub 2} stream suitable for sequestration.

Smith, Ellen D [ORNL; Saulsbury, Bo [ORNL

2008-03-01T23:59:59.000Z

113

Bonneville - Hood River Vegetation Management Environmental Assessment  

SciTech Connect (OSTI)

To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

N /A

1998-08-01T23:59:59.000Z

114

ARAC: A flexible real-time dose consequence assessment system  

SciTech Connect (OSTI)

Since its beginning, the Atmospheric Release Advisory Capability (ARAC), an emergency radiological dose assessment service of the US Government, has been called on to do consequence assessments for releases into the atmosphere of radionuclides and a variety of other substances. Some of the more noteworthy emergency responses have been for the Three Mile Island and Chernobyl nuclear power reactor accidents, and more recently, for a cloud of gases from a rail-car spill into the Sacramento river of the herbicide metam sodium, smoke from hundreds of burning oil wells in Kuwait, and ash clouds from the eruption of Mt. Pinatubo. The spatial scales of these responses range from local, to regional, to global, and the response periods from hours, to weeks, to months. Because of the variety of requirements of each unique assessment, ARAC has developed and maintains a flexible system of people, computer software and hardware.

Ellis, J.S.; Sullivan, T.J.

1993-10-07T23:59:59.000Z

115

Corridor Information Corridor Length (miles)  

E-Print Network [OSTI]

Expy/I-290 WB I-290 WB Stevenson Expy/I-55 NB S Ashland Ave/Exit 28B I-88/Exit 15A US-20/US-45/US-12

116

Travis Miles ALL RIGHTS RESERVED  

E-Print Network [OSTI]

. These storms also cause extensive coastal damage through direct wind forcing, storm surge and precipitation sampling conditions. In my thesis I present data from Teledyne-Webb Slocum autonomous underwater vehicles

117

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

118

Three Mile Island Unit 1 Main Steam Line Break Three-Dimensional Neutronics/Thermal-Hydraulics Analysis: Application of Different Coupled Codes  

SciTech Connect (OSTI)

A comprehensive analysis of the double ended main steam line break (MSLB) accident assumed to occur in the Babcock and Wilcox Three Mile Island Unit 1 (TMI-1) has been carried out at the Dipartimento di Ingegneria Meccanica, Nucleare e della Produzione of the University of Pisa, Italy, in cooperation with the University of Zagreb, Croatia. The overall activity has been completed within the framework of the participation in the Organization for Economic Cooperation and Development-Committee on the Safety of Nuclear Installations-Nuclear Science Committee pressurized water reactor MSLB benchmark.Thermal-hydraulic system codes (various versions of Relap5), three-dimensional (3-D) neutronics codes (Parcs, Quabbox, and Nestle), and one subchannel code (Cobra) have been adopted for the analysis. Results from the following codes (or code versions) are assumed as reference:1. Relap5/mod3.2.2, beta version, coupled with the 3-D neutron kinetics Parcs code parallel virtual machine (PVM) coupling2. Relap5/mod3.2.2, gamma version, coupled with the 3-D neutron kinetics Quabbox code (direct coupling)3. Relap5/3D code coupled with the 3-D neutron kinetics Nestle code.The influence of PVM and of direct coupling is also discussed.Boundary and initial conditions of the system, including those relevant to the fuel status, have been supplied by Pennsylvania State University in cooperation with GPU Nuclear Corporation (the utility, owner of TMI) and the U.S. Nuclear Regulatory Commission. The comparison among the results obtained by adopting the same thermal-hydraulic nodalization and the coupled code version is discussed in this paper.The capability of the control rods to recover the accident has been demonstrated in all the cases as well as the capability of all the codes to predict the time evolution of the assigned transient. However, one stuck control rod caused some 'recriticality' or 'return to power' whose magnitude is largely affected by boundary and initial conditions.

D'Auria, Francesco [Universita di Pisa (Italy); Moreno, Jose Luis Gago [Universidad Politecnica de Barcelona (Spain); Galassi, Giorgio Maria [Universita di Pisa (Italy); Grgic, Davor [University of Zagreb (Croatia); Spadoni, Antonino [Universita di Pisa (Italy)

2003-05-15T23:59:59.000Z

119

Technology Assessment  

Broader source: Energy.gov (indexed) [DOE]

Roll to Roll (R2R) Processing 1 Technology Assessment 2 3 Contents 4 1. Introduction to the TechnologySystem ......

120

America's "Circulatory System" The 2.3 million miles of pipelines in the United States carry materials and data vital to our  

E-Print Network [OSTI]

for review and input; the resulting final assessment will govern future training and technical support- line safety. PSSP uses all the technical expertise at its disposal to assess and gather the most e and safely deliver energy, water, and com- munication services that power the nation's economy. Our Mission

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

America's "Circulatory System" The 2.3 million miles of pipelines in the United States carry materials and data vital to our  

E-Print Network [OSTI]

for review and input; the resulting final assessment will govern future training and technical support and increase pipe- line safety. PSSP uses all the technical expertise at its disposal to assess and g and safely deliver energy, water, and com- munication services that power the nation's economy. Our Mission

Neimark, Alexander V.

122

Consequence Assessment  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

123

Lessons learned and new challenges for integrated assessment under the National Environmental Policy Act  

SciTech Connect (OSTI)

One of the first government-sponsored demands for integrated assessment to support decision making in the United States is embodied in the National Environmental Policy Act of 1969 (NEPA). Over the past 25 years, Oak Ridge National Laboratory (ORNL) has supported federal agencies` in evaluating health and environmental impacts as required by NEPA. Many of ORNL`s efforts have focused on complex, programmatic assessments that break new ground and require and integrate expertise from a wide range of technical disciplines. Examples of ORNL projects that illustrate the use of integrated assessment approaches include environmental documentation for: (1) the Department of the Army`s Chemical Stockpile Disposal Program, (2) the Federal Energy Regulatory Commission`s licensing activities related to the Owens River Basin in eastern California and along a 500-mile reach of the upper Ohio River, and (3) the Nuclear Regulatory Commission`s decision regarding restart of the undamaged reactor (Unit 1) at Three Mile Island. Our discussion of these examples illustrates successful integrated assessment approaches and identifies new challenges facing integrated assessment activities.

Carnes, S.A.; Reed, R.M.

1995-12-31T23:59:59.000Z

124

The future of FRMAC assessment.  

SciTech Connect (OSTI)

FRMAC was born out of circumstances 25 years ago when 17 federal agencies descended on the states with good intention during the Three-Mile Island nuclear power plant incident. At that time it quickly became evident that a better way was needed to support state and local governments in their time of emergency and recovery process. FRMAC's single voice of Federal support coordinates the multiple agencies that respond to a radiological event. Over the years, FRMAC has exercised, evaluated, and honed its ability to quickly respond to the needs of our communities. As the times have changed, FRMAC has expanded its focus from nuclear power plant incidents, to threats of a terrorist radiological dispersal device (RDD), to the unthinkable - an Improvised nuclear device (IND). And just as having the right tools are part of any trade, FRMAC's tool set has and is evolving to meet contemporary challenges - not just to improve the time it takes to collect data and assess the situation, but to provide a quality and comprehensive product that supports a stressed decision maker, responsible for the protection of the public. Innovations in the movement of data and information have changed our everyday lives. So too, FRMAC is capitalizing on industry innovations to improve the flow of information: from the early predictive models, to streamlining the process of getting data out of the field; to improving the time it takes to get assessed products in to the hands of the decision makers. FRMAC is focusing on the future through the digital age of electronic data processing. Public protective action and dose avoidance is the challenge.

Laiche, Thomas P.

2010-03-01T23:59:59.000Z

125

EA-1366: Preliminary Environmental Assessment | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General...

126

Risk Assessment  

Broader source: Energy.gov [DOE]

A set of issues that state and local governments should carefully consider, with the goal of helping them assess and anticipate solutions for some worst case or unfortunate case scenarios as they...

127

Environmental Assessment -- Test Area North pool stabilization project update  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-08-01T23:59:59.000Z

128

Draft environmental assessment -- Test Area North pool stabilization project update  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-06-01T23:59:59.000Z

129

Proposed design requirements for high-integrity containers used to store, transport, and dispose of high-specific-activity, low-level radioactive wastes from Three Mile Island Unit II  

SciTech Connect (OSTI)

This report develops proposed design requirements for high integrity containers used to store, transport and/or dispose of high-activity, low-level radioactive wastes from Three Mile Island Unit II. The wastes considered are the dewatered resins produced by the EPICOR II waste treatment system used to clean-up the auxiliary building water. The radioactivity level of some of these EPICOR II liners is 1300 curies per container. These wastes may be disposed of in an intermediate depth burial (10 to 20 meter depth) facility. The proposed container design requirements are directed to ensure isolation of the waste and protection of the public health and safety.

Vigil, M.G.; Allen, G.C.; Pope, R.B.

1981-04-01T23:59:59.000Z

130

Integrated Environmental Assessment Part III: Exposure Assessment  

E-Print Network [OSTI]

issues such as life cycle assessment (LCA) fosters the needlife-cycle impact assessment (LCIA) process within in LCA is

McKone, Thomas E.; Small, Mitchell J.

2006-01-01T23:59:59.000Z

131

Financial Assessment  

E-Print Network [OSTI]

We would like to thank everyone who helped us with this report, including but not limited to: John Bolduc, Steve Lenkauskas, George Fernandes, and the staff at the City of Cambridge and Danehy Park who helped shape this report and made on-site instrument installation and data collection possible. Mark Lipson, Jack Clarke and Jean Rogers for their guidance with the environmental and community impact assessment. Bob Paine and Scott Abbett for their thoughts and experiences with the Medford McGlynn School wind turbine. This preliminary assessment report investigates the wind resource available at Danehy Park in the City of Cambridge, providing estimated power generation figures as well as cost and revenue estimates and

Cy Chan; Pamela Silva; Chao Zhang

2011-01-01T23:59:59.000Z

132

Utirik Atoll Dose Assessment  

SciTech Connect (OSTI)

On March 1, 1954, radioactive fallout from the nuclear test at Bikini Atoll code-named BRAVO was deposited on Utirik Atoll which lies about 187 km (300 miles) east of Bikini Atoll. The residents of Utirik were evacuated three days after the fallout started and returned to their atoll in May 1954. In this report we provide a final dose assessment for current conditions at the atoll based on extensive data generated from samples collected in 1993 and 1994. The estimated population average maximum annual effective dose using a diet including imported foods is 0.037 mSv y{sup -1} (3.7 mrem y{sup -1}). The 95% confidence limits are within a factor of three of their population average value. The population average integrated effective dose over 30-, 50-, and 70-y is 0.84 mSv (84, mrem), 1.2 mSv (120 mrem), and 1.4 mSv (140 mrem), respectively. The 95% confidence limits on the population-average value post 1998, i.e., the 30-, 50-, and 70-y integral doses, are within a factor of two of the mean value and are independent of time, t, for t > 5 y. Cesium-137 ({sup 137}Cs) is the radionuclide that contributes most of this dose, mostly through the terrestrial food chain and secondarily from external gamma exposure. The dose from weapons-related radionuclides is very low and of no consequence to the health of the population. The annual background doses in the U. S. and Europe are 3.0 mSv (300 mrem), and 2.4 mSv (240 mrem), respectively. The annual background dose in the Marshall Islands is estimated to be 1.4 mSv (140 mrem). The total estimated combined Marshall Islands background dose plus the weapons-related dose is about 1.5 mSv y{sup -1} (150 mrem y{sup -1}) which can be directly compared to the annual background effective dose of 3.0 mSv y{sup -1} (300 mrem y{sup -1}) for the U. S. and 2.4 mSv y{sup -1} (240 mrem y{sup -1}) for Europe. Moreover, the doses listed in this report are based only on the radiological decay of {sup 137}Cs (30.1 y half-life) and other radionuclides. However, we continually see {sup 137}Cs in the groundwater at all contaminated atolls; the turnover time of the groundwater is about 5 y. The {sup 137}Cs can only get to the groundwater by leaching through the soil column when a portion of the soluble fraction of {sup 137}Cs inventory in the soil is transported to the groundwater when rainfall is heavy enough to cause recharge of the aquifer. This process is causing a loss of {sup 137}Cs out of the root zone of the plants that provides an environmental loss constant ({lambda}{sub env}) in addition to radiological decay {lambda}{sub rad}. Consequently, there is an effective rate of loss, {lambda}{sub eff} = {lambda}{sub rad} + {lambda}{sub env} that is the sum of the radiological and environmental-loss decay constants. We have had, and continue to have, a vigorous program to determine the rate of the environmental loss process. What we do know at this time is that the loss of {sup 137}Cs over time is greater than the estimate based on radiological decay only, and that the actual dose received by the Utirik people over 30-, 50-, or 70-y will be less than those presented in this report.

Robison, W.L.; Conrado, C.L.; Bogen, K.T

1999-10-06T23:59:59.000Z

133

Geothermal resource assessment of the Yucca Mountain Area, Nye County, Nevada. Final report  

SciTech Connect (OSTI)

An assessment of the geothermal resources within a fifty-mile radius of the Yucca Mountain Project area was conducted to determine the potential for commercial development. The assessment includes collection, evaluation, and quantification of existing geological, geochemical, hydrological, and geophysical data within the Yucca Mountain area as they pertain to geothermal phenomena. Selected geologic, geochemical, and geophysical data were reduced to a set of common-scale digital maps using Geographic Information Systems (GIS) for systematic analysis and evaluation. Available data from the Yucca Mountain area were compared to similar data from developed and undeveloped geothermal areas in other parts of the Great Basin to assess the resource potential for future geothermal development at Yucca Mountain. This information will be used in the Yucca Mountain Site Characterization Project to determine the potential suitability of the site as a permanent underground repository for high-level nuclear waste.

Flynn, T.; Buchanan, P.; Trexler, D. [Nevada Univ., Las Vegas, NV (United States). Harry Reid Center for Environmental Studies, Division of Earth Sciences; Shevenell, L., Garside, L. [Nevada Univ., Reno, NV (United States). Mackay School of Mines, Nevada Bureau of Mines and Geology

1995-12-01T23:59:59.000Z

134

NANA Wind Resource Assessment Program Final Report  

SciTech Connect (OSTI)

NANA Regional Corporation (NRC) of northwest Alaska is located in an area with abundant wind energy resources. In 2007, NRC was awarded grant DE-FG36-07GO17076 by the US Department of Energy's Tribal Energy Program for funding a Wind Resource Assessment Project (WRAP) for the NANA region. The NANA region, including Kotzebue Electric Association (KEA) and Alaska Village Electric Cooperative (AVEC) have been national leaders at developing, designing, building, and operating wind-diesel hybrid systems in Kotzebue (starting in 1996) and Selawik (2002). Promising sites for the development of new wind energy projects in the region have been identified by the WRAP, including Buckland, Deering, and the Kivalina/Red Dog Mine Port Area. Ambler, Shungnak, Kobuk, Kiana, Noorvik & Noatak were determined to have poor wind resources at sites in or very near each community. However, all five of these communities may have better wind resources atop hills or at sites with slightly higher elevations several miles away.

Jay Hermanson

2010-09-23T23:59:59.000Z

135

Flibe assessments.  

SciTech Connect (OSTI)

An assessment of the issues on using flibe for fusion applications has been made. It is concluded that sufficient tritium breeding can be achieved for a flibe blanket, especially if a few cm of Be is include in the blanket design. A key issue is the control of the transmutation products such as TF and F{sub 2}. A REDOX (Reducing-Oxidation) reaction has to be demonstrated which is compatible to the blanket design. Also, MHD may have strong impact on heat transfer if the flow is perpendicular to the magnetic field. The issues associated with the REDOX reaction and the MHD issues have to be resolved by both experimental program and numerical solutions.

Sze, D. K.; McCarthy, K.; Sawan, M.; Tillack, M.; Ying, A.; Zinkle, S.

2000-11-15T23:59:59.000Z

136

Assessor Training Assessment Techniques  

E-Print Network [OSTI]

NVLAP Assessor Training Assessment Techniques: Communication Skills and Conducting an Assessment listener 路Knowledgeable Assessor Training 2009: Assessment Techniques: Communication Skills & Conducting, truthful, sincere, discrete 路 Diplomatic 路 Decisive 路 Selfreliant Assessor Training 2009: Assessment

137

Assessment 101: The Assessment Cycle, Clear and  

E-Print Network [OSTI]

Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014 Kellogg West Conference Center, Pomona, CA Resource Binder #12;2014-2015 WASC Senior College and University Commission is pleased expectations. Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014. Kellogg West, Pomona, CA

Su, Xiao

138

Fort Stewart integrated resource assessment. Volume 1, Executive summary  

SciTech Connect (OSTI)

The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.

Larson, L.L.; Keller, J.M.

1993-10-01T23:59:59.000Z

139

Assessment of Future Vehicle Transportation Options and Their...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the United States while simultaneously reducing GHGs through the expanded use of renewable electricity-fueled transportation and reduced emissions per vehicle-mile (VMT). On a...

140

Robins Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect (OSTI)

The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins Air Force Base (AFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the AFMC Robins AFB facility located approximately 15 miles south of Macon, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 13 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative-description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect (OSTI)

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

142

ORISE: Hazard Assessments  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

assesses both chemical and radiation exposures, and conducts both internal and external radiation dose assessments. Our capabililities include: Linkage of exposure data to site...

143

Privacy Impact Assessment  

Energy Savers [EERE]

PRIVACY IMPACT ASSESSMENT: ORG NAME - SYSTEM NAME PIA Template Version 3 - May, 2009 1 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template....

144

Portsmouth Needs Assessment  

Broader source: Energy.gov [DOE]

Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

145

ASSESSMENT FOR THE SOUTHWEST  

E-Print Network [OSTI]

SERVICE CLIMATE CHANGE & CULTURAL RESOURCE PLANNING PROGRAM 17 EARTH SYSTEM MODELS 18 CLIMATE ASSESSMENTS

Wong, Pak Kin

146

Paducah Needs Assessment  

Broader source: Energy.gov [DOE]

Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers.

147

Healthy Transportation Policy and Vehicle Miles  

E-Print Network [OSTI]

Food Environment Index (# of fast food and convenience stores divided by grocery stores and farmers markets) More info at www.publichealthadvocacy.org 2) Distance and safety of access to K-12 schools of procedures, methods and tools by which a policy, program or project may be judged for its potential health

Bertini, Robert L.

148

Estimating Vehicle Miles Traveled on Local Roads  

E-Print Network [OSTI]

in social science and we relate it to traffic volumes. We demonstrate that VMT on local roads exhibits a scale-free property: it follows two piecewise (double) power law distributions. In other words, the total local VMT can be obtained by properly...

Qian, Jiayu

2013-11-07T23:59:59.000Z

149

Three Mile Canyon | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective JumpInc., 2010) |TheseeSprings Wind ParkThree

150

Miles Electric Vehicles | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbH JumpSprings, Vermont: EnergyMidwest853204掳,

151

Chapter 3. Vehicle-Miles Traveled  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998 10,643 10,998 10,998 10,64397 272 522 542PeruCarbonThousandYear2.3.

152

square miles | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,SaveWhiskey Flatshydro Home Water Homerequestsoftware Homesquare

153

OpenEI Community - square miles  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/Geothermal < Oklahomast,Logistics Agency (DLA) RFP - Deadline -

154

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect (OSTI)

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

155

Distributed road assessment system  

DOE Patents [OSTI]

A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

Beer, N. Reginald; Paglieroni, David W

2014-03-25T23:59:59.000Z

156

Solar Resource Assessment  

SciTech Connect (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

157

Application of probabilistic risk assessment techniques during design phase for dry storage casks  

SciTech Connect (OSTI)

Canisters containing the Three Mile Island (TMI) spent fuel and debris are being stored in a storage pool at the Idaho National Engineering Laboratory (INEL). In order to store these canisters in dry storage casks, a system is being designed to remove entrained water from the canisters. The conceptual design for this drying process was evaluated in respect to the occurrence of a nuclear criticality. The system design was evaluated to address the mechanical failure of the components. Also, human interfaces with the equipment were assessed. The integration of these two facets resulted in a model that was quantified to calculate the occurrence frequency of a nuclear criticality. Changes to design, administrative guidelines, and procedures were recommended so that an acceptable level of risk based on nuclear criticality occurrence frequency could be achieved. 1 ref., 2 figs.

Hallbert, B.P.; Satterwhite, D.G.; Meale, B.M.

1990-01-01T23:59:59.000Z

158

Writing Assessment: Additional Resources  

E-Print Network [OSTI]

29 Appendix A Writing Assessment: Additional Resources #12;30 Where can I find out more into the assessment process. On-campus resources give you with a "real person" to contact should you have questions Resources for Higher Education Outcomes Assessment http://www2.acs.ncsu.edu/UPA/survey/resource.htm Ohio

Schweik, Charles M.

159

Management Assessment and Independent Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The revision to this Guide reflects current assessment practices, international standards, and changes in the Department of Energy expectations. Cancels DOE G 414.1-1. Canceled by DOE G 414.1-1B.

2001-05-31T23:59:59.000Z

160

Assessing the assessments: Pharmaceuticals in the environment  

SciTech Connect (OSTI)

The relatively new issue of pharmaceutical contamination of the environment offers the opportunity to explore the application of values to the construction, communication and management of risk. The still-developing regulatory policies regarding environmental contamination with pharmaceuticals provide fertile ground for the introduction of values into the definition and management of risk. In this report, we summarize the current knowledge regarding pharmaceutical contamination of the environment and discuss specific attributes of pharmaceuticals that require special consideration. We then present an analysis showing that if values are incorporated into assessing, characterizing and managing risk, the results of risk assessments will more accurately reflect the needs of various stakeholders. Originating from an acknowledgement of the inherent uncertainty and value-laden nature of risk assessment, the precautionary principle (and later, the multi-criteria, integrated risk assessment), provides a direction for further research and policy development.

Enick, O.V. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: oana.enick@gov.bc.ca; Moore, M.M. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: mmoore@sfu.ca

2007-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Home Energy Assessments  

ScienceCinema (OSTI)

A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

Dispenza, Jason

2013-05-29T23:59:59.000Z

162

Home Energy Assessments  

SciTech Connect (OSTI)

A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

Dispenza, Jason

2010-01-01T23:59:59.000Z

163

Environmental Assessment: geothermal direct heat project, Marlin, Texas  

SciTech Connect (OSTI)

The Federal action addressed by this Environmental Assessment (EA) is joint funding the retrofitting of a heating and hot water system in a hospital at Marlin, Texas, with a geothermal preheat system. The project will be located within the existing hospital boiler room. One supply well was drilled in an existing adjacent parking lot. It was necessary to drill the well prior to completion of this environmental assessment in order to confirm the reservoir and to obtain fluids for analysis in order to assess the environmental effects of fluid disposal. Fluid from operation will be disposed of by discharging it directly into existing street drains, which will carry the fluid to Park Lake and eventually the Brazos River. Fluid disposal activities are regulated by the Texas Railroad Commission. The local geology is determined by past displacements in the East Texas Basin. Boundaries are marked by the Balcones and the Mexia-Talco fault systems. All important water-bearing formations are in the cretaceous sedimentary rocks and are slightly to highly saline. Geothermal fluids are produced from the Trinity Group; they range from approximately 3600 to 4000 ppM TDS. Temperatures are expected to be above 64/sup 0/C (147/sup 0/F). Surface water flows southeastward as a part of the Brazos River Basin. The nearest perennial stream is the Brazos River 5.6 km (3.5 miles) away, to which surface fluids will eventually discharge. Environmental impacts of construction were small because of the existing structures and paved areas. Construction run-off and geothermal flow-test fluid passed through a small pond in the city park, lowering its water quality, at least temporarily. Construction noise was not out of character with existing noises around the hospital.

Not Available

1980-08-01T23:59:59.000Z

164

Vandenberg Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect (OSTI)

The US Air Force Space Command (SPACECOM) has tasked the Pacific Northwest Laboratory (PNL), as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the SPACECOM VAFB facility located approximately 50 miles northwest of Santa Barbara, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analysis of EROs are presented in ten common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). In addition, a case study of process loads at Space Launch Complex-4 (SLC-4) is included. A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O and M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and value index (VI) of each ERO. Finally, an appendix includes a summary of an economic analysis case study of the South Vandenberg Power Plant (SVPP) operating scenarios.

Daellenbach, K.K.; Dagle, J.E.; Dittmer, A.L.; Elliott, D.B.; Halverson, M.A.; Hickman, B.J.; Parker, G.B.; Richman, E.E.; Shankle, S.A.

1993-06-01T23:59:59.000Z

165

Cape Canaveral Air Force Station integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect (OSTI)

The U.S. Air Force (USAF) has tasked the Pacific Northwest Laboratory (PNL) in support of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Cape Canaveral Air Force Station (AFS). Projects considered can be either in the form of energy management or energy conservation. The overall efforts of this task are based on a model program PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at Cape Canaveral AFS, which is located approximately 10 miles north of Cocoa Beach, Florida. It is a companion report to Volume 1: Executive Summary and Volume 2: Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings, impacts on operations and maintenance (O&M), and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. Descriptions of the evaluation methodologies and technical and cost assumptions are also provided for each ERO. Summary tables present the cost- effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis, indicating the net present value (NPV) and savings-to-investment ratio (SIR) of each ERO.

Sandusky, W.F.; Eichman, C.J.; King, D.A.; McMordie, K.L.; Parker, S.A.; Shankle, S.A.; Wahlstrom, R.R.

1994-03-01T23:59:59.000Z

166

Survey of Biomass Resource Assessments and Assessment Capabilities  

E-Print Network [OSTI]

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Energy ...................................................................................................................................4 Biomass Resource Assessment Products and Assessment Methodologies, Department of Industry, Tourism and Resources, Australia Ms. Siti Hafsah, Office of the Minister of Energy

167

Test Area North Pool Stabilization Project: Environmental assessment  

SciTech Connect (OSTI)

The Test Area North (TAN) Pool is located within the fenced TAN facility boundaries on the Idaho National Engineering Laboratory (INEL). The TAN pool stores 344 canisters of core debris from the March, 1979, Three Mile Island (TMI) Unit 2 reactor accident; fuel assemblies from Loss-of-Fluid Tests (LOFT); and Government-owned commercial fuel rods and assemblies. The LOFT and government owned commercial fuel rods and assemblies are hereafter referred to collectively as {open_quotes}commercial fuels{close_quotes} except where distinction between the two is important to the analysis. DOE proposes to remove the canisters of TMI core debris and commercial fuels from the TAN Pool and transfer them to the Idaho Chemical Processing Plant (ICPP) for interim dry storage until an alternate storage location other than at the INEL, or a permanent federal spent nuclear fuel (SNF) repository is available. The TAN Pool would be drained and placed in an industrially and radiologically safe condition for refurbishment or eventual decommissioning. This environmental assessment (EA) identifies and evaluates environmental impacts associated with (1) constructing an Interim Storage System (ISS) at ICPP; (2) removing the TMI and commercial fuels from the pool and transporting them to ICPP for placement in an ISS, and (3) draining and stabilizing the TAN Pool. Miscellaneous hardware would be removed and decontaminated or disposed of in the INEL Radioactive Waste Management Complex (RWMC). This EA also describes the environmental consequences of the no action alternative.

NONE

1996-05-01T23:59:59.000Z

168

Industrial Assessment Center  

SciTech Connect (OSTI)

The University of Dayton (UD) performed energy assessments, trained students and supported USDOE objectives. In particular, the UD Industrial Assessment Center (IAC) performed 96 industrial energy assessment days for mid-sized manufacturers. The average identified and implemented savings on each assessment were $261,080 per year and $54,790 per year. The assessments served as direct training in industrial energy efficiency for 16 UD IAC students. The assessments also served as a mechanism for the UD IAC to understand manufacturing energy use and improve upon the science of manufacturing energy efficiency. Specific research results were published in 16 conference proceedings and journals, disseminated in 22 additional invited lectures, and shared with the industrial energy community through the UD IAC website.

J. Kelly Kissock; Becky Blust

2007-04-17T23:59:59.000Z

169

NATURAL GAS MARKET ASSESSMENT  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION NATURAL GAS MARKET ASSESSMENT PRELIMINARY RESULTS In Support.................................................................................... 6 Chapter 2: Natural Gas Demand.................................................................................................. 10 Chapter 3: Natural Gas Supply

170

Hoisting & Rigging Assessment Form  

Broader source: Energy.gov [DOE]

Assess the institutional and department/division hoisting and rigging (including forklift, overhead cranes small hoists, and mobile cranes) requirements, policies, procedures, and work practices...

171

TECHNOLOGY READINESS ASSESSMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT...

172

Harvesting Chaparral Biomass for Energy--An Environmental Assessment1  

E-Print Network [OSTI]

of chaparral wood fuel products have been pro- posed, and a transportable wood densification unit is being readily available and few indus- trial plants can use wood fuels (J. A. Miles, pers. commun.). However

Standiford, Richard B.

173

Training Needs Assessment Presentation  

Broader source: Energy.gov [DOE]

The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's participate in the DOE training needs assessment (TNA). This presentation goes over how the training needs assessment (TNA) is done and the components of the TNA data collection tool.

174

INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER  

SciTech Connect (OSTI)

The U. S. Department of Energy抯 Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

MELINDA KRAHENBUHL

2010-05-28T23:59:59.000Z

175

Geothermal reservoir assessment case study: Northern Dixie Valley, Nevada  

SciTech Connect (OSTI)

Two 1500 foot temperature gradient holes and two deep exploratory wells were drilled and tested. Hydrologic-hydrochemical, shallow temperature survey, structural-tectonic, petrologic alteration, and solid-sample geochemistry studies were completed. Eighteen miles of high resolution reflection seismic data were gathered over the area. The study indicates that a geothermal regime with temperatures greater than 400/sup 0/F may exist at a depth of approximately 7500' to 10,000' over an area more than ten miles in length.

Denton, J.M.; Bell, E.J.; Jodry, R.L.

1980-11-01T23:59:59.000Z

176

The Idaho National Engineering and Environmental Laboratory Source Water Assessment  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 square miles and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL's drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey's Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency's Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a this vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL's Source Water Assessment. Of the INEEL's 12 public water systems, three systems rated as low susceptibility (EBR-1, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL's public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, G.

2003-03-17T23:59:59.000Z

177

Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project  

SciTech Connect (OSTI)

This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

1984-12-01T23:59:59.000Z

178

Environmental assessment of electricity scenarios with Life Cycle Assessment  

E-Print Network [OSTI]

been assessed with Life Cycle Assessment (LCA) studies [1], [2], [3] and [4]. However environmentalEnvironmental assessment of electricity scenarios with Life Cycle Assessment Touria Larbi1 impacts assessment of scenarios is very rarely evaluated through a life cycle perspective partly because

Paris-Sud XI, Universit de

179

Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado  

SciTech Connect (OSTI)

Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

NONE

1996-03-01T23:59:59.000Z

180

An Analysis of Two Industrial Assessment Center Extended Assessments  

E-Print Network [OSTI]

The Industrial Assessment Center at Texas A&M University extended assessments by spending about two extra days at each of three manufacturing plants. The extended assessments are characterized by use of sophisticated electronic monitoring equipment...

Farouz, H. E.; Gafford, G. D.; Eggebrecht, J. A.; Heffington, W. M.

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

2011-09-15T23:59:59.000Z

182

Environmental Assessment of  

E-Print Network [OSTI]

Environmental Assessment of Geologic Storage of CO2 December 2003 REVISED: March 2004 MIT LFEE 2003........................................................................................ 23 4.4 CO2 Pipeline Transportation........................................................................................ 16 4.2 Enhanced Oil Recovery (EOR

183

DOEEA-1203 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Radi o l ogi cal Control Manual low-level b u r i a l grounds 1 ow- 1 eve1 m i xed waste low-level waste National Environmental Policy Act o f 1969 performance assessment Resource...

184

Assessing Renewable Energy Options  

Broader source: Energy.gov [DOE]

Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

185

assessment ioa assessment: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

186

Colorado Statewide Forest Resource Assessment  

E-Print Network [OSTI]

Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Private Forestry Redesign Initiative 2 National Guidance for Statewide Forest Resource Assessments 4 The Colorado Statewide Resource Assessment and all appendices are available online on the Colorado State Forest

187

Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text  

SciTech Connect (OSTI)

This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

Not Available

1984-05-01T23:59:59.000Z

188

National Geothermal Resource Assessment and Classification |...  

Broader source: Energy.gov (indexed) [DOE]

Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification presentation...

189

Cognitive-Developmental Assessments 1 Designing Cognitive-Developmental Assessments  

E-Print Network [OSTI]

Cognitive-Developmental Assessments 1 Designing Cognitive-Developmental Assessments: A Case Study or quote without permission of the authors. #12;Cognitive-Developmental Assessments 2 Designing Cognitive in designing this assessment system is establishing a cognitive-developmental map in which age

Junker, Brian

190

Image Utility Assessment and a Relationship with Image Quality Assessment  

E-Print Network [OSTI]

Image Utility Assessment and a Relationship with Image Quality Assessment David M. Rouse , Romuald information to humans, and this paper investigates the utility assessment task, where human observers evaluate the usefulness of a natural image as a surrogate for a reference. Current QA algorithms implicitly assess utility

Hemami, Sheila S.

191

Farm Assessment for Water Resource Protection Field Assessment  

E-Print Network [OSTI]

Farm Assessment for Water Resource Protection WQ-42 Field Assessment for Water Resource Protection Extension Service 路 West Lafayette, IN 47907 Introduction The Field Assessment for Water Resource Protection management practices. You decide what actions to take. Field Assessment for Water Resource Protection

Holland, Jeffrey

192

Windows technology assessment  

SciTech Connect (OSTI)

This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

Baron, J.J.

1995-10-01T23:59:59.000Z

193

Industrial Assessment Center  

SciTech Connect (OSTI)

Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

Dr. Diane Schaub

2007-03-05T23:59:59.000Z

194

EA-1207: Final Environmental Assessment  

Broader source: Energy.gov [DOE]

Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

195

University Assessment Contacts Academic Units  

E-Print Network [OSTI]

.j.arp@oregonstate.edu 541-737-2331 Notes: Agricultural and Resource Economics Assessment Rep: Email: Phone: Penelope DiebelUniversity Assessment Contacts Academic Units COLLEGE OF AGRICULTURAL SCIENCES Assessment Rep.Capalbo@oregonstate.edu 541-737-5639 Notes: Agricultural Education and Agricultural Sciences Assessment Rep: Email: Phone

Escher, Christine

196

Engineering assessment of inactive uranium mill tailings: Lakeview site, Lakeview, Oregon  

SciTech Connect (OSTI)

This assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The three alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material (Option I) and removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II and III). Cost estimates range from about $6,000,000 for stabilization in-place, to about $7,500,000 for disposal at a distance of about 10 miles. Three alternatives for reprocessing the Lakeview tailings were examined: heap leaching, treatment at an existing mill, and reprocessing at a new conventional mill. The cost of the uranium recovered would be over $450/lb of U/sub 3/O/sub 8/ and hence reprocessing is not economical.

none,

1981-10-01T23:59:59.000Z

197

Geothermal-resource assessment of the Steamboat-Routt Hot Springs area, Colorado. Resources Series 22  

SciTech Connect (OSTI)

An assessment of the Steamboat Springs region in northwest Colorado was initiated and carried out in 1980 and 1981. The goal of this program was to delineate the geological features controlling the occurrence of the thermal waters (temperatures in excess of 68/sup 0/F (20/sup 0/C)) in this area at Steamboat Springs and 8 miles (12.8 km) north at Routt Hot Springs. Thermal waters from Heart Spring, the only developed thermal water source in the study area, are used in the municipal swimming pool in Steamboat Springs. The assessment program was a fully integrated program consisting of: dipole-dipole, Audio-magnetotelluric, telluric, self potential and gravity geophysical surveys, soil mercury and soil helium geochemical surveys; shallow temperature measurements; and prepartion of geological maps. The investigation showed that all the thermal springs appear to be fault controlled. Based on the chemical composition of the thermal waters it appears that Heart Spring in Steamboat Springs is hydrologically related to the Routt Hot Springs. This relationship was further confirmed when it was reported that thermal waters were encountered during the construction of the new high school in Strawberry Park on the north side of Steamboat Springs. In addition, residents stated that Strawberry Park appears to be warmer than the surrounding country side. Geological mapping has determined that a major fault extends from the Routt Hot Springs area into Strawberry Park.

Pearl, R.H.; Zacharakis, T.G.; Ringrose, C.D.

1983-01-01T23:59:59.000Z

198

Geothermal industry assessment  

SciTech Connect (OSTI)

An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

Not Available

1980-07-01T23:59:59.000Z

199

Generating Resourcesg Assessment Methodology  

E-Print Network [OSTI]

Fixed Cost (annual basis) Fuel Price Forecasts Natural gas, coal, oil Transmission, Integration Costs resource assessment informs the resource strategy R t d t h l i Resource types and technologies and information Review draft plan resource assumptions with the Power Committee/Council for approval to use

200

Watershed Assessment Program Team  

E-Print Network [OSTI]

颅 Proposal to model urban storm-water control practices 路 Teach advanced graduate course 颅 BASINS and SWAT 路 Monitoring Activities 路 Modeling Activities 路 Remote Sensing / GIS 路 Sources of Funding 路 What do We Need 路 Much more monitoring being done by cities and local governments 颅 Source water assessment work done

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ESPA Deltas: Assessing Health,  

E-Print Network [OSTI]

weather events and sea-level rise, coupled with population growth and urbanisation. The Project The ESPAEcosystems Livelihood Services Poverty Community ESPA Deltas: Assessing Health, Livelihoods www.espadeltas.net@EspaDeltas Who are the poor? Who are the key stakeholders and what are their roles

S骲ester, Andr醩

202

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

203

Assessments A Training Manual  

E-Print Network [OSTI]

for industrial clients has always been tied to the cost of energy resources. Beginning with the oil embargo the initial investment by the manufacturing concern now makes the full industrial assessment attractive, and indexing the final document took the better part of a year. This investment of time and effort has yielded

204

Graduate Assessment Strategies 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The  

E-Print Network [OSTI]

Graduate Assessment Strategies Resources: 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The graduate level assessment plans from OSU may be particularly helpful: http://oregonstate.edu/admin/aa/apaa/assessment/graduate-assessment/graduate- assessment-plans 2. A list of best practices is online at http://inside.mines.edu/UserFiles/File/Assessment

205

Composite heat damage assessment  

SciTech Connect (OSTI)

The effects of heat damage were determined on the residual mechanical, physical, and chemical properties of IM6/3501-6 laminates, and potential nondestructive techniques to detect and assess material heat damage were evaluated. About one thousand preconditioned specimens were exposed to elevated temperatures, then cooled to room temperature and tested in compression, flexure, interlaminar shear, shore-D hardness, weight loss, and change in thickness. Specimens experienced significant and irreversible reduction in their residual properties when exposed to temperatures exceeding the material upper service temperature of this material (350{degrees}F). The Diffuse Reflectance Infrared Fourier Transform and Laser-Pumped Fluorescence techniques were found to be capable of rapid, in-service, nondestructive detection and quantitation of heat damage in IM6/3501- 6. These techniques also have the potential applicability to detect and assess heat damage effects in other polymer matrix composites.

Janke, C.J.; Wachter, E.A. [Oak Ridge National Lab., TN (United States); Philpot, H.E. [Oak Ridge K-25 Site, TN (United States); Powell, G.L. [Oak Ridge Y-12 Plant, TN (United States)

1993-12-31T23:59:59.000Z

206

PUREX facility hazards assessment  

SciTech Connect (OSTI)

This report documents the hazards assessment for the Plutonium Uranium Extraction Plant (PUREX) located on the US Department of Energy (DOE) Hanford Site. Operation of PUREX is the responsibility of Westinghouse Hanford Company (WHC). This hazards assessment was conducted to provide the emergency planning technical basis for PUREX. DOE Order 5500.3A requires an emergency planning hazards assessment for each facility that has the potential to reach or exceed the lowest level emergency classification. In October of 1990, WHC was directed to place PUREX in standby. In December of 1992 the DOE Assistant Secretary for Environmental Restoration and Waste Management authorized the termination of PUREX and directed DOE-RL to proceed with shutdown planning and terminal clean out activities. Prior to this action, its mission was to reprocess irradiated fuels for the recovery of uranium and plutonium. The present mission is to establish a passively safe and environmentally secure configuration at the PUREX facility and to preserve that condition for 10 years. The ten year time frame represents the typical duration expended to define, authorize and initiate follow-on decommissioning and decontamination activities.

Sutton, L.N.

1994-09-23T23:59:59.000Z

207

Life cycle assessment  

SciTech Connect (OSTI)

Life-Cycle Assessment (LCA) is a technical, data-based and holistic approach to define and subsequently reduce the environmental burdens associated with a product, process, or activity by identifying and quantifying energy and material usage and waste discharges, assessing the impact of those wastes on the environment, and evaluating and implementing opportunities to effect environmental improvements. The assessment includes the entire life-cycle of the product, process or activity encompassing extraction and processing of raw materials, manufacturing, transportation and distribution, use/reuse, recycling and final disposal. LCA is a useful tool for evaluating the environmental consequences of a product, process, or activity, however, current applications of LCA have not been performed in consistent or easily understood ways. This inconsistency has caused increased criticism of LCA. The EPA recognized the need to develop an LCA framework which could be used to provide consistent use across the board. Also, additional research is needed to enhance the understanding about the steps in the performance of an LCA and its appropriate usage. This paper will present the research activities of the EPA leading toward the development of an acceptable method for conducting LCA`s. This research has resulted in the development of two guidance manuals. The first manual is intended to be a practical guide to conducting and interpreting the life-cycle inventory. A nine-step approach to performing a comprehensive inventory is presented along with the general issues to be addressed. The second manual addresses life-cycle design.

Curran, M.A. [Environmental Protection Agency, Cincinnati, OH (United States)

1994-12-31T23:59:59.000Z

208

Waste minimization assessment procedure  

SciTech Connect (OSTI)

Perry Nuclear Power Plant began developing a waste minimization plan early in 1991. In March of 1991 the plan was documented following a similar format to that described in the EPA Waste Minimization Opportunity Assessment Manual. Initial implementation involved obtaining management's commitment to support a waste minimization effort. The primary assessment goal was to identify all hazardous waste streams and to evaluate those streams for minimization opportunities. As implementation of the plan proceeded, non-hazardous waste streams routinely generated in large volumes were also evaluated for minimization opportunities. The next step included collection of process and facility data which would be useful in helping the facility accomplish its assessment goals. This paper describes the resources that were used and which were most valuable in identifying both the hazardous and non-hazardous waste streams that existed on site. For each material identified as a waste stream, additional information regarding the materials use, manufacturer, EPA hazardous waste number and DOT hazard class was also gathered. Once waste streams were evaluated for potential source reduction, recycling, re-use, re-sale, or burning for heat recovery, with disposal as the last viable alternative.

Kellythorne, L.L. (Centerior Energy, Cleveland, OH (United States))

1993-01-01T23:59:59.000Z

209

Geologic technical assessment of the Richton salt dome, Mississippi, for potential expansion of the U.S. strategic petroleum reserve.  

SciTech Connect (OSTI)

Technical assessment and remodeling of existing data indicates that the Richton salt dome, located in southeastern Mississippi, appears to be a suitable site for expansion of the U.S. Strategic Petroleum Reserve. The maximum area of salt is approximately 7 square miles, at a subsurface elevation of about -2000 ft, near the top of the salt stock. Approximately 5.8 square miles of this appears suitable for cavern development, because of restrictions imposed by modeled shallow salt overhang along several sides of the dome. The detailed geometry of the overhang currently is only poorly understood. However, the large areal extent of the Richton salt mass suggests that significant design flexibility exists for a 160-million-barrel storage facility consisting of 16 ten-million-barrel caverns. The dome itself is prominently elongated from northwest to southeast. The salt stock appears to consist of two major spine features, separated by a likely boundary shear zone trending from southwest to northeast. The dome decreases in areal extent with depth, because of salt flanks that appear to dip inward at 70-80 degrees. Caprock is present at depths as shallow as 274 ft, and the shallowest salt is documented at -425 ft. A large number of existing two-dimensional seismic profiles have been acquired crossing, and in the vicinity of, the Richton salt dome. At least selected seismic profiles should be acquired, examined, potentially reprocessed, and interpreted in an effort to understand the limitations imposed by the apparent salt overhang, should the Richton site be selected for actual expansion of the Reserve.

Snider, Anna C.; Rautman, Christopher Arthur; Looff, Karl M. (Geologic Consultant)

2006-01-01T23:59:59.000Z

210

Standards and Conformity Assessment Training  

E-Print Network [OSTI]

Standards and Conformity Assessment Training Workshops for Government Agencies Fundamentals of Standards and Conformity Assessment Training for all levels of government NIST offers interactive workshops and seminars for federal, state, and local government agencies on the fundamentals of standards, conformity

211

Model Fire Protection Assessment Guide  

Broader source: Energy.gov [DOE]

This Assessment guide covers the implementation of the DOE's responsibility of assuring that DOE and the DOE Contractors have established Fire Protection Programs that are at the level required for the area being assessed.

212

Uncertainties in energy technology assessments  

E-Print Network [OSTI]

In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

Coate, David

1980-01-01T23:59:59.000Z

213

Dual Rater Competency Assessment FAQ  

Broader source: Energy.gov [DOE]

The purpose of the dual rater competency assessment is to provide a clearer picture of the individual抯 developmental needs by combining self-assessment and supervisory input. Together, these two...

214

DOE limited standard: Operations assessments  

SciTech Connect (OSTI)

Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

NONE

1996-05-01T23:59:59.000Z

215

ORISE: Radiological program assessment services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental monitoring programs Operational environments Decontamination and decommissioning projects Compliance assessments Radiological release programs ORISE is actively...

216

"" EPAT# Risk Assessments Environmental Impact  

E-Print Network [OSTI]

"" EPAT# Risk Assessments Appendixes Environmental Impact Statement NESHAPS for Radionuclides for Hazardous Air Pollutants Risk Assessments Environmental Impact Statement for NESHAPS Radionuclides VOLUME 2 for Hazardous Air Pollutants EPA 520.1'1.-89-006,-2 Risk Assessments Environmental Impact Statement for NESHAPS

217

Assessment of Demand Response Resource  

E-Print Network [OSTI]

Assessment of Demand Response Resource Potentials for PGE and Pacific Power Prepared for: Portland January 15, 2004 K:\\Projects\\2003-53 (PGE,PC) Assess Demand Response\\Report\\Revised Report_011504.doc #12;#12;quantec Assessment of Demand Response Resource Potentials for I-1 PGE and Pacific Power I. Introduction

218

Assessor Training NVLAP Assessment Forms  

E-Print Network [OSTI]

NVLAP Assessor Training NVLAP Assessment Forms #12;Assessor Training 2009: NVLAP Assessment Forms 2 Summary 路Test Method Review Summary 路ProgramSpecific Checklists Examples #12;Assessor Training 2009: NVLAP are completed 路 Assessor Names, Dates, Lab Code #12;Assessor Training 2009: NVLAP Assessment Forms 4 NIST

219

A framework for combining social impact assessment and risk assessment  

SciTech Connect (OSTI)

An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, 憆isk and social impact assessment (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: A hybrid model to combine SIA and SRA namely RSIA is proposed. RSIA can provide the proper mechanism to assess social impacts of natural hazards. RSIA can play the role of ex-post as well as ex-ante assessment. For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany) [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany)] [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany)] [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)] [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

2013-11-15T23:59:59.000Z

220

Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment  

SciTech Connect (OSTI)

This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State抯 posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated Assessment Modeling  

SciTech Connect (OSTI)

This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

2012-10-31T23:59:59.000Z

222

Risk Identification and Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 Resource Program September DepartmentRio GrandeAssessmentRisk

223

1986 Cogeneration Market Assessment  

E-Print Network [OSTI]

implementation path such as changing energy general direction. prices, tax laws, FERC decisions, avoided costs, permitting etc., the cogeneration industry is What's missing is usually the meaning of th still strong. market assessment to the end user... If there was an answer to all these questi s cost savings. These savings can enable him to once and for all and if none of these remain competitive in the face of severe influencing factors would change, wouldn't 1ife world-wide competition. be simple. Benefits...

Wallace, D. G.

224

REVIEWING PERFORMANCE ASSESSMENTS SUPPORTING  

E-Print Network [OSTI]

Purpose: To summarize current NRC policy and guidance, which should assist in making informed decisions regarding land disposal of unique low-level radioactive waste streams, including disposal of significant quantities of depleted uranium until a new regulation is implemented. Background: In September 2009, NRC staff conducted two public workshops soliciting early public input on major issues associated with a potential rulemaking for land disposal of unique waste streams including, but not limited to, significant quantities of depleted uranium. During these workshops, a number of stakeholders expressed interest or concern with the review of performance assessments supporting land disposal of unique waste streams prior to completion of the rulemaking process. Discussion: The enclosure contains a summary of existing guidance for reviewing performance assessments with a focus on issues associated with the safe disposal of unique waste streams. NRC staff is providing this guidance to the Agreement States for their information, and for distribution to their licensees, as appropriate. If you have any questions regarding this correspondence, please contact me at 301-415-3340 or the individuals named below.

Robert J. Lewis

2010-01-01T23:59:59.000Z

225

Wind Resource Assessment in Europe Using Emergy  

E-Print Network [OSTI]

energy in Vietnam: Resource assessment, development statusWind Resource Assessment in Europe Using Emergy Subodhspeed). Keywords: Wind resource assessment; Emergy Analysis;

Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

2014-01-01T23:59:59.000Z

226

Perceptual quality assessment for compressed video  

E-Print Network [OSTI]

Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

Yang, Kai-Chieh

2007-01-01T23:59:59.000Z

227

Hanford Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Needs Assessment Hanford Needs Assessment October 1997 This Needs Assessment for former Hanford production workers was developed for the purpose of collecting existing information...

228

NATURAL RESOURCES ASSESSMENT  

SciTech Connect (OSTI)

The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

D.F. Fenster

2000-12-11T23:59:59.000Z

229

Airborne Particulate Threat Assessment  

SciTech Connect (OSTI)

Aerosol threat detection requires the ability to discern between threat agents and ambient background particulate matter (PM) encountered in the environment. To date, Raman imaging technology has been demonstrated as an effective strategy for the assessment of threat agents in the presence of specific, complex backgrounds. Expanding our understanding of the composition of ambient particulate matter background will improve the overall performance of Raman Chemical Imaging (RCI) detection strategies for the autonomous detection of airborne chemical and biological hazards. Improving RCI detection performance is strategic due to its potential to become a widely exploited detection approach by several U.S. government agencies. To improve the understanding of the ambient PM background with subsequent improvement in Raman threat detection capability, ChemImage undertook the Airborne Particulate Threat Assessment (APTA) Project in 2005-2008 through a collaborative effort with the National Energy Technology Laboratory (NETL), under cooperative agreement number DE-FC26-05NT42594. During Phase 1 of the program, a novel PM classification based on molecular composition was developed based on a comprehensive review of the scientific literature. In addition, testing protocols were developed for ambient PM characterization. A signature database was developed based on a variety of microanalytical techniques, including scanning electron microscopy, FT-IR microspectroscopy, optical microscopy, fluorescence and Raman chemical imaging techniques. An automated particle integrated collector and detector (APICD) prototype was developed for automated collection, deposition and detection of biothreat agents in background PM. During Phase 2 of the program, ChemImage continued to refine the understanding of ambient background composition. Additionally, ChemImage enhanced the APICD to provide improved autonomy, sensitivity and specificity. Deliverables included a Final Report detailing our findings and APICD Gen II subsystems for automated collection, deposition and detection of ambient particulate matter. Key findings from the APTA Program include: Ambient biological PM taxonomy; Demonstration of key subsystems needed for autonomous bioaerosol detection; System design; Efficient electrostatic collection; Automated bioagent recognition; Raman analysis performance validating Td<9 sec; Efficient collection surface regeneration; and Development of a quantitative bioaerosol defection model. The objective of the APTA program was to advance the state of our knowledge of ambient background PM composition. Operation of an automated aerosol detection system was enhanced by a more accurate assessment of background variability, especially for sensitive and specific sensing strategies like Raman detection that are background-limited in performance. Based on this improved knowledge of background, the overall threat detection performance of Raman sensors was improved.

Patrick Treado; Oksana Klueva; Jeffrey Beckstead

2008-12-31T23:59:59.000Z

230

assessment risk assessment: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procedure 447 A 576-YEAR WEBER RIVER STREAMFLOW RECONSTRUCTION FROM TREE RINGS FOR WATER RESOURCE RISK ASSESSMENT IN THE WASATCH FRONT, UTAH1 Environmental Sciences and Ecology...

231

INEEL Source Water Assessment  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL抯 drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey抯 Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency抯 Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL抯 Source Water Assessment. Of the INEEL抯 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL抯 public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, Gerald

2003-03-01T23:59:59.000Z

232

Information needs for risk assessment  

SciTech Connect (OSTI)

Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

1990-12-31T23:59:59.000Z

233

Enterprise Assessments Operational Awareness Record, Waste Treatment...  

Energy Savers [EERE]

March 2015 Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness...

234

Assessment of environmental health and safety issues associated with the commercialization of unconventional gas recovery: Devonian shale  

SciTech Connect (OSTI)

The purpose of this study is to identify and examine potential public health and safety issues and the potential environmental impacts from recovery of natural gas from Devonian age shale. This document will serve as background data and information for planners within the government to assist in development of our new energy technologies in a timely and environmentally sound manner. This report describes the resource and the DOE eastern gas shales project in Section 2. Section 3 describes the new and developing recovery technologies associated with Devonian shale. An assessment of the environment, health and safety impacts associated with a typical fields is presented in Section 4. The typical field for this assessment occupies ten square miles and is developed on a 40-acre spacing (that is, there is a well in each 40-acre grid). This field thus has a total of 160 wells. Finally, Section 5 presents the conclusions and recommendations. A reference list is provided to give a greater plant. Based on the estimated plant cost and the various cases of operating income, an economic analysis was performed employing a profitability index criterion of discounted cash flow to determine an interest rate of return on the plant investment.

Not Available

1981-09-01T23:59:59.000Z

235

Final Environmental Assessment and Finding of No Significant Impact: Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

SciTech Connect (OSTI)

This environmental assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Slick Rock, Colorado, Uranium Mill Tailings Remedial Action Project sites. The sites consist of two areas designated as the North Continent (NC) site and the Union Carbide (UC) site. In 1996, the U.S. Department of Energy (DOE) completed surface cleanup at both sites and encapsulated the tailings in a disposal cell 5 miles east of the original sites. Maximum concentration limits (MCLs) referred to in this environmental assessment are the standards established in Title 40 ''Code of Federal Regulations'' Part 192 (40 CFR 192) unless noted otherwise. Ground water contaminants of potential concern at the NC site are uranium and selenium. Uranium is more prevalent, and concentrations in the majority of alluvial wells at the NC site exceed the MCL of 0.044 milligram per liter (mg/L). Selenium contamination is less prevalent; samples from only one well had concentrations exceeding the MCL of 0.01 mg/L. To achieve compliance with Subpart B of 40 CFR 192 at the NC site, DOE is proposing the strategy of natural flushing in conjunction with institutional controls and continued monitoring. Ground water flow and transport modeling has predicted that concentrations of uranium and selenium in the alluvial aquifer will decrease to levels below their respective MCLs within 50 years.

N /A

2003-03-13T23:59:59.000Z

236

Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

Not Available

1993-09-01T23:59:59.000Z

237

Pollutant Assessments Group Procedures Manual  

SciTech Connect (OSTI)

This procedures manual combines the existing procedures for radiological and chemical assessment of hazardous wastes used by the Pollutant Assessments Group at the time of manuscript completion (October 1, 1990). These procedures will be revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy and support procedures. Format inconsistencies will be corrected in subsequent revisions of individual procedures.

Chavarria, D.E.; Davidson, J.R.; Espegren, M.L.; Kearl, P.M.; Knott, R.R.; Pierce, G.A.; Retolaza, C.D.; Smuin, D.R.; Wilson, M.J.; Witt, D.A. (Oak Ridge National Lab., TN (USA)); Conklin, N.G.; Egidi, P.V.; Ertel, D.B.; Foster, D.S.; Krall, B.J.; Meredith, R.L.; Rice, J.A.; Roemer, E.K. (Oak Ridge Associated Universities, Inc., TN (USA))

1991-02-01T23:59:59.000Z

238

Management and Independent Assessments Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide reflects updated standards for assessment practices, international standards, and changes in DOE expectations related to quality assurance (QA). Cancels DOE G 414.1-1B.

2014-03-27T23:59:59.000Z

239

Environmental Assessment (Nova Scotia, Canada)  

Broader source: Energy.gov [DOE]

Nova Scotia Environment conducts environmental assessments on projects and developments to ensure they adhere to the laws and regulations of the province. Developments required to undergo an...

240

CRAD, Operations Authorization Assessment Plan  

Broader source: Energy.gov [DOE]

The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project.

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

SEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF  

E-Print Network [OSTI]

and disinfect anyy microorganisms that may be present The majority of Recycled water produced in ArizonaSEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF BIOLOGICAL VARIABILITY Ch h M R k Ph D W t Q lit S i li tChannah M. Rock, Ph.D., Water Quality Specialist James Walworth, Ph

Fay, Noah

242

An Impact Assessment Model for Distributed Adaptive Security Situation Assessment*  

E-Print Network [OSTI]

1 An Impact Assessment Model for Distributed Adaptive Security Situation Assessment* Mark Heckman mechanism is not simply to stop attacks, but to protect a computing resource so that the resource can continue to perform its function. A computing resource, however, is only a component of a larger system

California at Davis, University of

243

Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary  

E-Print Network [OSTI]

Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary Step 10 Name and programmes by which Forestry Commission Wales will help to deliver Woodlands for Wales 颅 the Wales woodland of Demographic Equality Strands (2006) National Assembly for Wales 路 Forestry Commission survey of visitors

244

Quality Assessment in Oncology  

SciTech Connect (OSTI)

The movement to improve healthcare quality has led to a need for carefully designed quality indicators that accurately reflect the quality of care. Many different measures have been proposed and continue to be developed by governmental agencies and accrediting bodies. However, given the inherent differences in the delivery of care among medical specialties, the same indicators will not be valid across all of them. Specifically, oncology is a field in which it can be difficult to develop quality indicators, because the effectiveness of an oncologic intervention is often not immediately apparent, and the multidisciplinary nature of the field necessarily involves many different specialties. Existing and emerging comparative effectiveness data are helping to guide evidence-based practice, and the increasing availability of these data provides the opportunity to identify key structure and process measures that predict for quality outcomes. The increasing emphasis on quality and efficiency will continue to compel the medical profession to identify appropriate quality measures to facilitate quality improvement efforts and to guide accreditation, credentialing, and reimbursement. Given the wide-reaching implications of quality metrics, it is essential that they be developed and implemented with scientific rigor. The aims of the present report were to review the current state of quality assessment in oncology, identify existing indicators with the best evidence to support their implementation, and propose a framework for identifying and refining measures most indicative of true quality in oncologic care.

Albert, Jeffrey M. [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Das, Prajnan, E-mail: prajdas@mdanderson.org [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)

2012-07-01T23:59:59.000Z

245

PRELIMINARY ASSESSMENT OF ENERGY ISSUES  

E-Print Network [OSTI]

PRELIMINARY ASSESSMENT OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Kevin OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Summary As requested by the California Hydroelectric Project (FERC No. 2082). Staff's assessment indicates that, from the perspective of potential

246

PERFORMANCE ASSESSMENT OF PID CONTROLLERS  

E-Print Network [OSTI]

PERFORMANCE ASSESSMENT OF PID CONTROLLERS W. Tan, H. J. Marquez, and T. Chen搂 Abstract: Criteria based on disturbance rejection and system robustness are proposed to assess the performance of PID-loop or multi-loop. Key Words: PID Control; Tuning; Performance; Robustness; Structured Singular Value. 1

Marquez, Horacio J.

247

Environmental Health and Safety Assessment  

E-Print Network [OSTI]

Environmental Health and Safety Assessment Program Manual 7/15/2013 #12;Environmental Health/26/2013. The most recent version of this document is available electronically at: http://sp.ehs.cornell.edu/env/general-environmental-management/environmental.........................................................................................................................4 #12;Environmental Health and Safety Assessment Program Manual Approved by: (Barb English) Last

Pawlowski, Wojtek

248

Contract 98 Self-Assessment  

SciTech Connect (OSTI)

This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

Not Available

1993-04-01T23:59:59.000Z

249

College of Charleston Assessment Template  

E-Print Network [OSTI]

@cofc.edu Phone: 3-7163 Office address: Silcox Physical Education Center, Office 317 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean 颅 School of Education, Health, and Human Performance; Dr. Sara Davis, Associate Dean for Accountability, Assessment

Kunkle, Tom

250

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

NONE

1995-08-01T23:59:59.000Z

251

Species for the screening assessment. Columbia River Comprehensive Impact Assessment  

SciTech Connect (OSTI)

Because of past nuclear production operations along the Columbia River, there is intense public and tribal interest in assessing any residual Hanford Site related contamination along the river from the Hanford Reach to the Pacific Ocean. The Columbia River Comprehensive Impact Assessment was proposed to address these concerns. The assessment of the Columbia River is being conducted in phases. The initial phase is a screening assessment of the risk, which addresses current environmental conditions for a range of potential uses. One component of the screening assessment estimates the risk from contaminants in the Columbia River to the environment. The objective of the ecological risk assessment is to determine whether contaminants from the Columbia River pose a significant threat to selected receptor species that exist in the river and riparian communities of the study area. This report (1) identifies the receptor species selected for the screening assessment of ecological risk and (2) describes the selection process. The species selection process consisted of two tiers. In Tier 1, a master species list was developed that included many plant and animal species known to occur in the aquatic and riparian systems of the Columbia River between Priest Rapids Dam and the Columbia River estuary. This master list was reduced to 368 species that occur in the study area (Priest Rapids Dam to McNary Dam). In Tier 2, the 181 Tier 1 species were qualitatively ranked based on a scoring of their potential exposure and sensitivity to contaminants using a conceptual exposure model for the study area.

Becker, J.M.; Brandt, C.A.; Dauble, D.D.; Maughan, A.D.; O`Neil, T.K.

1996-03-01T23:59:59.000Z

252

RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT  

SciTech Connect (OSTI)

Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

2012-03-31T23:59:59.000Z

253

Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment  

E-Print Network [OSTI]

ignored in life cycle assessment (LCA). Some productionexplicit manner, while life cycle assessment (LCA) does notuse impacts in life cycle assessment. Int J LCA 11(5):363

Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

2010-01-01T23:59:59.000Z

254

IMPORTANCE OF SAFETY CULTURE ASSESSMENT  

SciTech Connect (OSTI)

Safety Management has lately been considered by some Nuclear Regulatory agencies as the tool on which to concentrate their efforts to implement modern regulation structures, because Safety Culture was said to be difficult to monitor. However, Safety Culture can be assessed and monitored even if it is problematical to make Safety Culture the object of regulation. This paper stresses the feasibility and importance of Safety Culture Assessment based on self-assessment applications performed in several nuclear organizations in Latin America. Reasons and ownership for assessing Safety Culture are discussed, and relevant aspects considered for setting up and programming such an assessment are shown. Basic principles that were taken into account, as well as financial and human resources used in actual self-assessments are reviewed, including the importance of adequate statistical analyses and the necessity of proper feed-back of results. The setting up of action plans to enhance Safety Culture is the final step of the assessment program that once implemented will enable to establish a Safety Culture monitoring process within the organization.

Spitalnik, J.

2004-10-06T23:59:59.000Z

255

TMCC WIND RESOURCE ASSESSMENT  

SciTech Connect (OSTI)

North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

Turtle Mountain Community College

2003-12-30T23:59:59.000Z

256

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network [OSTI]

efficiency as a result of using recognized assessment practices and M&V protocols. The end goal of this effort is developing a self sustaining program (without Federal government financial assistance) to certifying plants for energy efficiency by 2011...

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

257

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

258

Compound and Elemental Analysis At Seven Mile Hole Area (Larson...  

Open Energy Info (EERE)

Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Standard X-ray diffractometer (XRD) analyses were used in the...

259

Foreign Fishery Developments Japan's 1975 Fish Catch Within 200 Miles  

E-Print Network [OSTI]

forcign nation, \\~ a, aD )ut 12 percent Ie" than in 1974. The Japane...~ Fi , heric, ge nc) reponedl

260

Innovative Cell Materials and Designs for 300 Mile Range EVs  

Broader source: Energy.gov (indexed) [DOE]

Alamgir - LG Chem Power (Co-PI) Geun-Chang Chung - LG Chem Other DOE National Labs - LBNL, ANL Partners Overview LGCPI 3 LGCPI Project Objectives Anode: To develop a 7001000...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Full Useful Life (120,000 miles) Exhaust Emission Performance...  

Broader source: Energy.gov (indexed) [DOE]

A4 Avant Chevrolet Silverado APBF-DEC Organization DOE, EPA, additive companies, automobile manufacturers, engine manufacturers, energy companies, emission control mfrs.,...

262

Sofitel Montreal Golden Mile 1155 Sherbrooke St. West  

E-Print Network [OSTI]

://www.mcgill.ca/travelservices/hotels/ The McGill special guestroom rates vary throughout the year and offer exceptional value to McGill Alumni. The hotel features 258 luxurious guestrooms and suites, all with floor to ceiling windows, spacious marble, the Delta Montreal offers a 4 star, full service experience! Enjoy our 456 oversized guestrooms, most

Kambhampati, Patanjali

263

Management of 'Siratro' and 'Miles lotononis' in association with Kleingrass  

E-Print Network [OSTI]

were chemically fractionated into cell contents (NDE) and cell-wall constituents (NDF). The neutral detergent fiber (NDF) portion was subsequently partitioned into hemicellu- lose, cellulose, lignin and ash, according to current laboratory iv... procedures. Kleingrass was significantly higher than the legumes in NDF as well as NDF components, except for lignin. In vitro digestible dry matter (IVDDM) differed between grass and legumes, the latter being slightly more digestible. Cell wall digesti...

Siewerdt, Lotar

1972-01-01T23:59:59.000Z

264

An internship in the agricultural chemical industry: Miles Inc.  

E-Print Network [OSTI]

?' Mslonekg city 310 A Den? Dawso Aquise 6 ( Hubbard West, Mount 31 ~ Cal r Cocllda Elm MO Xv +PI iep iab 7886'% , CreSt ' Cc nea& art. parker I 0 knn Bkyrcr mT, uQ, Reer d Mart 4 ~ ~ C I 0 Ao er 148 Grays I 47 198 ? I M 3 72 Co I la I ttonwccd... B APPENDIX C APPENDIX D Daily Log of Activities . Territory Map . Internship Manual Outline Functional Linkages . . 10 21 22 24 . 25 DEFINITION OF TERMS SCOUTING: To examine a field for insects to determine the need for chemical...

Adams, Sharla K

1994-01-01T23:59:59.000Z

265

A TVS GROUP COMPANY OUR VISION & MILE STONES  

E-Print Network [OSTI]

;Topics Recommended for IIT Madras - 2014 Resume Writing Understand the structure of a resume How to use effective words in a resume to make the resume impressive Followed by One to One feedback session during;Revised Module, Duration& Schedule 路 1.5 Hours Resume Writing 路 6 hoursGroup Discussion 路 3 hours

Krishnapura, Nagendra

266

INDIAN STATISTICAL INSTITUTE Mile, Mysore Road, RVCE Post  

E-Print Network [OSTI]

-mail address:_____________________________________ 4. Date of birth: ______________ 5. Age__________________ 6 is not applicable. Attach attested copies of relevant certificate from appropriate authority for other than general sheet and certificates. No. Examination Year of admission Year of passing Division/ Grade Special

Bandyopadhyay, Antar

267

MHK Projects/Fortyeight Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpIncMAK Technologies Jump to:BW2 TidalMarFalmouth <AdamsFortyeight

268

MHK Projects/Twelve Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpIncMAKGalway Bay IE < MHK ProjectRose BendReachTurnbull

269

Salt Wells, Eight Mile Flat | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton Abbey Wind Farm(CTIhinderProject SmartSalt

270

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton AbbeyARaft River, IdahoServicios Eolicos SI

271

Mile High: Order (2012-SE-4501) | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 MasterAcquisiti ----Energy3-SE-1505)MidwestOrder

272

Mile High: Proposed Penalty (2012-SE-4501) | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 MasterAcquisiti ----Energy3-SE-1505)MidwestOrderProposed

273

Seven Mile Hill Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to: navigation, search| Open EnergySermatec JumpSestaSettlersSevenis

274

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to: navigation, search| Open EnergySermatec

275

March 28, 1979: Three Mile Island | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMA EnergyMagna1983: Strategic DefenseEnergy

276

Microsoft Word - 10_Million_Loaded_Miles.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping RichlandScatteringWater Vapor77 PAGE896:UFC 2300.00

277

Innovative Cell Materials and Designs for 300 Mile Range EVs  

Broader source: Energy.gov (indexed) [DOE]

Multiple On track Test Cell Multiple On track Delivered year 2013 high energy density cells on 11014 On track Systems Integration Design 93112 On track Test Reports...

278

Innovative Cell Materials and Designs for 300 Mile Range EVs  

Broader source: Energy.gov (indexed) [DOE]

and characterization Multiple On track Test Cell Multiple On track Delivered 18 cells with high energy density on Nov. 30 th , 2012 On track Systems Integration Design 9...

279

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

280

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Viability Assessment Volume 4  

SciTech Connect (OSTI)

Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

DOE

1998-12-01T23:59:59.000Z

282

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

283

Fort Carson Wind Resource Assessment  

SciTech Connect (OSTI)

This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

Robichaud, R.

2012-10-01T23:59:59.000Z

284

Environmental Impact Assessment in Canadian  

E-Print Network [OSTI]

energy projects/pipelines) Canadian Nuclear Safety Commission (for uranium mining, nuclear facilities26/02/2014 1 Environmental Impact Assessment in Canadian Mine/Energy Development The Purpose

Boisvert, Jeff

285

Cogeneration Assessment Methodology for Utilities  

E-Print Network [OSTI]

A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic...

Sedlik, B.

1983-01-01T23:59:59.000Z

286

Carbon Park Environmental Impact Assessment  

E-Print Network [OSTI]

of offsetting the University's carbon footprint, promoting biodiversity and establishing easily maintained Carbon Park Environmental Impact Assessment A B.E.S.T. Project By, Adam Bond 2011 #12; Bishop's University Carbon Park

287

Utility View of Risk Assessment  

E-Print Network [OSTI]

This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

Bickham, J.

288

Fiscal Year 2012 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

289

Transboundary aquifers: Southwestern states assess  

E-Print Network [OSTI]

tx H2O | pg. 14 Southwestern states assess Researchers from three universities in Texas, New Mexico, and Arizona and from the U.S. Geological Survey (USGS) are partnering on a new project to evaluate aquifers that span the United States... and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States...

Wythe, Kathy

2008-01-01T23:59:59.000Z

290

Guam Initial Technical Assessment Report  

SciTech Connect (OSTI)

Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

2011-04-01T23:59:59.000Z

291

Focus Series: Denver Energy Advisor Program Helps Homeowners Go the Extra Mile in Mile-High City  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal7.pdfFlash_2010_-24.pdfOverview Flow Cells

292

Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment  

E-Print Network [OSTI]

Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk, WA Ann Williamson and Mike Cox, EPA Region 10 Office of Environmental Assessment, will be presenting

293

Reliability Assessment Incorporating Operational Considerations and Economic  

E-Print Network [OSTI]

PSERC Reliability Assessment Incorporating Operational Considerations and Economic Aspects Engineering Research Center Reliability Assessment Incorporating Operational Considerations and Economic Center (PSERC) research project titled "Reliability Assessment Incorporating Operational Considerations

294

ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS  

E-Print Network [OSTI]

method爇nown燼s爈ife?cycleassessment (LCA),爓hich爄s燼營nput?Output燣ife燙ycleAssessment(EIO? LCA)爉odel. 營nput?Output燣ife?Cycle Assessment(EIO?LCA)爉odel(

Masanet, Eric

2010-01-01T23:59:59.000Z

295

Life-cycle Assessment of Semiconductors  

E-Print Network [OSTI]

yield. A hybrid life cycle assessment (LCA) model is used;more accurate life-cycle assessment (LCA) of electronicthe purposes of life-cycle assessment (LCA). While it may be

Boyd, Sarah B.

2009-01-01T23:59:59.000Z

296

printed on recycled paper INDUSTRIAL ASSESSMENT CENTER  

E-Print Network [OSTI]

printed on recycled paper INDUSTRIAL ASSESSMENT CENTER ENERGY EFFICIENCY, POLLUTION PREVENTION ASSESSMENT REPORT FOR ENERGY EFFICIENCY, POLLUTION PREVENTION, AND PRODUCTIVITY IMPROVEMENT No. CO0999 ASSESSMENT DATE: February 29, 2000 LOCATION: ______, Colorado PRINCIPAL PRODUCTS: Injection molded plastic

297

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

SciTech Connect (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

298

Assessing the local windfield with instrumentation  

SciTech Connect (OSTI)

This report concerns the development and testing of a technique for the initial screening and evaluation of potential sites for wind-energy conversion systems (WECS). The methodology was developed through a realistic siting exercise. The siting exercise involved measurements of winds along the surface and winds aloft using a relatively new instrument system, the Tethered Aerodynamic Lifting Anemometer (TALA) kite; notation of ecological factors such as vegetation flagging, soil erosion and site exposure, and verification of an area best suited for wind-energy development by establishing and maintaining a wind monitoring network. The siting exercise was carried out in an approximately 100-square-mile region of the Tehachapi Mountains of Southern California. The results showed that a comprehensive site survey involving field measurements, ecological survey, and wind-monitoring can be an effective tool for preliminary evaluation of WECS sites.

Zambrano, T.G.

1980-10-01T23:59:59.000Z

299

Innovative Exploration Techniques for Geothermal Assessment at...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration...

300

Model Refinement for Economic Assessments of  

E-Print Network [OSTI]

Model Refinement for Economic Assessments of Hawai`i Clean Energy Policies: Scenario Selection agency thereof. #12;Model Refinement for Economic Assessments of Hawaii Clean Energy Policies Selection

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

NREL: International Activities - Biomass Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biomass Resource Assessment Map showing annual productivity of marginal lands in APEC economies. Biomass resource assessments quantify the existing or potential biomass material in...

302

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 12, 2015 EA-1976D: Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida February 10, 2015 EA-2002: Final Environmental Assessment...

303

The Environmental Style: Writing Environmental Assessments and...  

Energy Savers [EERE]

The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide...

304

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes January 17, 2008 Present: Diane Armpriest bag session (thresholds for data). The agenda item for the next ad hoc assessment committee

O'Laughlin, Jay

305

Ecosystem Vulnerability Assessment - Patterns of Climate Change...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the Southwest Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the...

306

assessments: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

307

Environmental Impact Statements and Environmental Assessments...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the...

308

Assessment of Evaluation, Measurement, and Verification Methods...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment of Evaluation, Measurement, and Verification Methods - 2014 BTO Peer Review Assessment of Evaluation, Measurement, and Verification Methods - 2014 BTO Peer Review...

309

UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis  

E-Print Network [OSTI]

UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis Final Issue Date: March 21, 2010 #12;Carbon Footprint Analysis Background This chapter of the Sustainability Assessment focuses on UCSF

Yamamoto, Keith

310

Independent Oversight Assessment, Waste Treatment and Immobilization...  

Office of Environmental Management (EM)

Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the...

311

National Geothermal Resource Assessment and Classification |...  

Broader source: Energy.gov (indexed) [DOE]

Resource Assessment and Classification National Geothermal Resource Assessment and Classification This work will enable lower riskcost deployment of conventional and EGS...

312

Colorado State University Industrial Assessment Center Saves...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

audit. | Photo courtesy of University of Missouri IAC. Industrial Assessment Centers Train Future Energy-Savvy Engineers Industrial Assessment Centers Help Students, Communities...

313

Environmental Impact Assessment (New Brunswick, Canada)  

Broader source: Energy.gov [DOE]

Environmental Impact Assessment (EIA) is a process through which the environmental impacts potentially resulting from a proposed project are identified and assessed early in the planning process....

314

Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment  

SciTech Connect (OSTI)

To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

NONE

1997-04-01T23:59:59.000Z

315

EA-0931: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment EA-0931: Final Environmental Assessment Center for Molecular Electronics University of Missouri, St. Louis This Environmental Assessment evaluates the...

316

Topaz II preliminary safety assessment  

SciTech Connect (OSTI)

The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz II space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safety assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the U.S. with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

Marshall, A.C. (Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, New Mexico 87110 (United States)); Voss, S.S. (Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)); Haskin, E. (Department of Chemical and Nuclear Engineering Department, Institute for Nuclear Power Studies, University of New Mexico, Albuquerque, New Mexico 87110 (United States))

1993-01-10T23:59:59.000Z

317

Topaz II preliminary safety assessment  

SciTech Connect (OSTI)

The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz 11 space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safely assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the US with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

Marshall, A.C. (Sandia National Labs., Albuquerque, NM (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, NM (United States)); Voss, S.S. (Los Alamos National Lab., NM (United States)); Haskin, E. (New Mexico Univ., Albuquerque, NM (United States). Dept. of Chemical and Nuclear Engineering)

1992-01-01T23:59:59.000Z

318

Qualitative methods for assessing risk  

SciTech Connect (OSTI)

The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

Mahn, J.A. [Sandia National Labs., Albuquerque, NM (United States); Hannaman, G.W. [Science Applications International Corp., San Diego, CA (United States); Kryska, P. [Science Applications International Corp., Albuquerque, NM (United States)

1995-04-01T23:59:59.000Z

319

Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document  

SciTech Connect (OSTI)

In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

NONE

1997-02-04T23:59:59.000Z

320

Membrane-Based Air Composition Control for Light-Duty Diesel Vehicles: A Benefit and Cost Assessment  

SciTech Connect (OSTI)

This report presents the methodologies and results of a study conducted by Argonne National Laboratory (Argonne) to assess the benefits and costs of several membrane-based technologies. The technologies evaluated will be used in automotive emissions-control and performance-enhancement systems incorporated into light-duty diesel vehicle engines. Such engines are among the technologies that are being considered to power vehicles developed under the government-industry Partnership for a New Generation of Vehicles (PNGV). Emissions of nitrogen oxides (NO{sub x}) from diesel engines have long been considered a barrier to use of diesels in urban areas. Recently, particulate matter (PM) emissions have also become an area of increased concern because of new regulations regarding emissions of particulate matter measuring 2.5 micrometers or less (PM{sub 2.5}). Particulates are of special concern for diesel engines in the PNGV program; the program has a research goal of 0.01 gram per mile (g/mi) of particulate matter emissions under the Federal Test Procedure (FTP) cycle. This extremely low level (one-fourth the level of the Tier II standard) could threaten the viability of using diesel engines as stand-alone powerplants or in hybrid-electric vehicles. The techniques analyzed in this study can reduce NO{sub x} and particulate emissions and even increase the power density of the diesel engines used in light-duty diesel vehicles.

K. Stork; R. Poola

1998-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

322

Assessing Energy Impact of Plug-In Hybrid Electric Vehicles: Significance of Daily Distance Variation over Time and Among Drivers  

SciTech Connect (OSTI)

Accurate assessment of the impact of plug-in hybrid electric vehicles (PHEVs) on petroleum and electricity consumption is a necessary step toward effective policies. Variations in daily vehicle miles traveled (VMT) over time and among drivers affect PHEV energy impact, but the significance is not well understood. This paper uses a graphical illustration, a mathematical derivation, and an empirical study to examine the cause and significance of such an effect. The first two methods reveal that ignoring daily variation in VMT always causes underestimation of petroleum consumption and overestimation of electricity consumption by PHEVs; both biases increase as the assumed PHEV charge-depleting (CD) range moves closer to the average daily VMT. The empirical analysis based on national travel survey data shows that the assumption of uniform daily VMT over time and among drivers causes nearly 68% underestimation of expected petroleum use and nearly 48% overestimation of expected electricity use by PHEVs with a 40-mi CD range (PHEV40s). Also for PHEV40s, consideration of daily variation in VMT over time but not among drivers similar to the way the utility factor curve is derived in SAE Standard SAE J2841 causes underestimation of expected petroleum use by more than 24% and overestimation of expected electricity use by about 17%. Underestimation of petroleum use and overestimation of electricity use increase with larger-battery PHEVs.

Lin, Zhenhong [ORNL; Greene, David L [ORNL

2012-01-01T23:59:59.000Z

323

Office of Worker Safety and Health Assessments | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Worker Safety and Health Assessments Office of Worker Safety and Health Assessments MISSION The Office of Worker Safety and Health Assessments conducts assessments to provide...

324

Risk assessment in environmental management  

SciTech Connect (OSTI)

This book is a straightforward exposition of US EPA-based procedures for the risk assessment and risk management of contaminated land, interwoven with discussions on some of the key fundamentals on the fate and transport of chemicals in the environment and the toxic action of environmental chemicals. The book is logically structured, commencing with a general overview of the principles of risk assessment and the interface with environmental legislation. There follows an introduction to environmental fate and transport, modeling, toxicology and uncertainty analysis, and a discussion of the elements of a risk assessment (site characterization, exposure analysis, toxic action and risk characterization), intake of a chemical with its environmental concentration and activity-related parameters such as inhalation rate and exposure time. The book concludes with a discussion on the derivation of risk-based action levels and remediation goals.

Asante-Duah, D.K.

1998-07-01T23:59:59.000Z

325

Ion exchange technology assessment report  

SciTech Connect (OSTI)

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW's. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-01-01T23:59:59.000Z

326

Ion exchange technology assessment report  

SciTech Connect (OSTI)

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-12-31T23:59:59.000Z

327

Technology assessment of RDX production  

SciTech Connect (OSTI)

The known processes for producing RDX were assessed with the goal of identifying the process that would generate the least waste and pollution. It was concluded that the Bachman process employed at Holston AAP is the most economical process for producing RDX and that it probably produces less waste than any other process. It was generally agreed that the entire Holston operation is a very clean one that complies with all federal and state emission standards. In addition, a number of opportunities in which Holston could reduce their wastes were identified. Preliminary assessments of waste and pollution profiles for alternate materials, with emphasis on dual-use materials, were performed.

Coburn, M.D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

1995-04-01T23:59:59.000Z

328

Integrated Environmental Assessment Part III: ExposureAssessment  

SciTech Connect (OSTI)

Human exposure assessment is a key step in estimating the environmental and public health burdens that result chemical emissions in the life cycle of an industrial product or service. This column presents the third in a series of overviews of the state of the art in integrated environmental assessment - earlier columns described emissions estimation (Frey and Small, 2003) and fate and transport modeling (Ramaswami, et al., 2004). When combined, these first two assessment elements provide estimates of ambient concentrations in the environment. Here we discuss how both models and measurements are used to translate ambient concentrations into metrics of human and ecological exposure, the necessary precursors to impact assessment. Exposure assessment is the process of measuring and/or modeling the magnitude, frequency and duration of contact between a potentially harmful agent and a target population, including the size and characteristics of that population (IPCS, 2001; Zartarian, et al., 2005). Ideally the exposure assessment process should characterize the sources, routes, pathways, and uncertainties in the assessment. Route of exposure refers to the way that an agent enters the receptor during an exposure event. Humans contact pollutants through three routes--inhalation, ingestion, and dermal uptake. Inhalation occurs in both outdoor environments and indoor environments where most people spend the majority of their time. Ingestion includes both water and food, as well as soil and dust uptake due to hand-to-mouth activity. Dermal uptake occurs through contacts with consumer products; indoor and outdoor surfaces; the water supply during washing or bathing; ambient surface waters during swimming or boating; soil during activities such as work, gardening, and play; and, to a lesser extent, from the air that surrounds us. An exposure pathway is the course that a pollutant takes from an ambient environmental medium (air, soil, water, biota, etc), to an exposure medium (indoor air, food, tap water, etc.) and to an exposed individual. Exposure scenarios are used to define plausible pathways for human contact. Recognition of the multiple pathways possible for exposure highlights the importance of a multimedia, multipathway exposure framework.

McKone, Thomas E.; Small, Mitchell J.

2006-06-01T23:59:59.000Z

329

A total risk assessment methodology for security assessment.  

SciTech Connect (OSTI)

Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

2009-06-01T23:59:59.000Z

330

California Valley Solar Ranch Biological Assessment  

Broader source: Energy.gov [DOE]

Biological Assessment for the California Valley Solar Ranch Project San Luis Obispo County, California

331

Geothermal resource assessment of the Animas Valley, Colorado. Resource Series 17  

SciTech Connect (OSTI)

The Colorado Geological Survey, has been engaged in assessing the nature and extent of Colorado's geothermal resources. The program has included geologic and hydrogeologic reconnaissance, and geophysical and geochemical surveys. In the Animas Valley, in southwestern Colorado, two groups of thermal springs exist: Pinkerton Springs to the north, and Tripp-Trimble-Stratten Springs about 5 miles (8.1 Km) south of Pinkerton. The geothermal resources of the Animas Valley were studied. Due to terrain problems in the narrow valley, a soil mercury survey was conducted only at Tripp-Trimble Stratten, while an electrical D.C. resistivity survey was limited to the vicinity of Pinkerton. Although higher mercury values tended to be near a previously mapped fault, the small extent of the survey ruled out conclusive results. Consistent low resistivity zones interpreted from the geophysical data were mapped as faults near Pinkerton, and compared well with aerial photo work and spring locations. This new information was added to reconnaissance geology and hydrogeology to provide several clues regarding the geothermal potential of the valley. Hydrothermal minerals found in faults in the study area are very similar to ore mined in a very young mountain range, nearby. Groundwater would not need to circulate very deeply along faults to attain the estimated subsurface temperatures present in the valley. The water chemistry of each area is unique. Although previously incompletely manned, faulting in the area is extensive. The geothermal resources in the Animas Valley are fault controlled. Pinkerton and Tripp-Trimble-Stratten are probably not directly connected systems, but may have the same source at distance. Recharge to the geothermal system comes from the needle and La Plata Mountains, and the latter may also be a heat source. Movement of the thermal water is probably primarily horizontal, via the Leadville Limestone aquifer.

McCarthy, K.P.; Zacharakis, T.G.; Ringrose, C.D.

1982-01-01T23:59:59.000Z

332

Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site  

SciTech Connect (OSTI)

This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as Attachment 1.

None

2003-04-23T23:59:59.000Z

333

Assessment Report Department of Economics  

E-Print Network [OSTI]

1 Assessment Report Department of Economics August, 2012 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non- majors, about the methods, core theory. Relation to the University at Large Economics is an important part of a liberal arts education because

Bogaerts, Steven

334

Assessment Report Department of Economics  

E-Print Network [OSTI]

1 Assessment Report Department of Economics September, 2009 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non-majors, about the methods, core theory discipline. Relation to the University at Large Economics is an important part of a liberal arts education

Bogaerts, Steven

335

REVISED NATURAL GAS MARKET ASSESSMENT  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION REVISED NATURAL GAS MARKET ASSESSMENT In Support of the 2007's natural gas market. It covers natural gas demand, supply, infrastructure, price, and possible alternative and the related Scenarios Project, and additional updated information. California natural gas demand growth

336

Transformer Efficiency Assessment - Okinawa, Japan  

SciTech Connect (OSTI)

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of 搆ey transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer抯 factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB抯 actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-05-01T23:59:59.000Z

337

Transformer Efficiency Assessment - Okinawa, Japan  

SciTech Connect (OSTI)

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of 搆ey transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer抯 factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB抯 actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-08-01T23:59:59.000Z

338

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

the socio-economic effects of drought. Strategic Goals Following the findings and recommendations from two (outside of agriculture) Few "disaster" declarations Not even a unified roster of drought eventsWESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

Neff, Jason

339

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

340

College of Charleston Assessment Template  

E-Print Network [OSTI]

You. Date form Completed: 9/29/2011 Program Name and Type Physical Education Teacher Education@cofc.edu Phone: 3-8247 Office address: Silcox Physical Education Center, Office 312 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean 颅 School

Kunkle, Tom

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

College of Charleston Assessment Template  

E-Print Network [OSTI]

You. Date form Completed: 9/29/2011 Program Name and Type Physical Education and Health, Health. Sue Balinsky Email: balinskys@cofc.edu Phone: 3-8242 Office address: Silcox Physical Education Center, Office 105 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr

Kunkle, Tom

342

Hazards Survey and Hazards Assessments  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

1997-08-21T23:59:59.000Z

343

CONSULTANT REPORT ASSESSMENT OF PUBLICLY  

E-Print Network [OSTI]

ENERGY EFFICIENCY POTENTIALS AND TARGETS SEPTEMBER 2011 CEC2002011007-AT Prepared for: California this information to the California Energy Commission for evaluation. This report assesses the energy efficiency potential and efficiency savings targets adopted for 2011颅2020 by the publicly owned utilities. This report

344

CRAD, Configuration Management Assessment Plan  

Broader source: Energy.gov [DOE]

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

345

The social fabric of Jeans' Assessing the Social: Coupling social simulation and assessment  

E-Print Network [OSTI]

. For instance, Life Cycle Assessment (LCA) (Guin閑, 2002) focuses more on the embedded resources consumption many are not intended as major forms of assessment. Physical assessment (e.g. Life Cycle Assessment (LCA)), monetary assessment (e.g. Cost Benefit Analysis (CBA)), scenario analysis (tools

Paris-Sud XI, Universit de

346

Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICEAmesApplication2ArgonneAssembly of a

347

Salt site performance assessment activities  

SciTech Connect (OSTI)

During this year the first selection of the tools (codes) for performance assessments of potential salt sites have been tentatively selected and documented; the emphasis has shifted from code development to applications. During this period prior to detailed characterization of a salt site, the focus is on bounding calculations, sensitivity and with the data available. The development and application of improved methods for sensitivity and uncertainty analysis is a focus for the coming years activities and the subject of a following paper in these proceedings. Although the assessments to date are preliminary and based on admittedly scant data, the results indicate that suitable salt sites can be identified and repository subsystems designed which will meet the established criteria for protecting the health and safety of the public. 36 references, 5 figures, 2 tables.

Kircher, J.F.; Gupta, S.K.

1983-01-01T23:59:59.000Z

348

Metal-air battery assessment  

SciTech Connect (OSTI)

The objective of this report is to evaluate the present technical status of the zinc-air, aluminum/air and iron/air batteries and assess their potential for use in an electric vehicle. In addition, this report will outline proposed research and development priorities for the successful development of metal-air batteries for electric vehicle application. 39 refs., 25 figs., 11 tabs.

Sen, R.K.; Van Voorhees, S.L.; Ferrel, T.

1988-05-01T23:59:59.000Z

349

ORISE: Radiological program assessment services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACKRadiological program assessment services Minimizing the

350

Sandia National Laboratories: situation assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbineredox-active perovskiteremovingsensorssituation assessment EC,

351

Preliminary melter performance assessment report  

SciTech Connect (OSTI)

The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

1994-08-01T23:59:59.000Z

352

E-Print Network 3.0 - assessment performance assessment Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OF ENGINEERING CYBERNETICS AND ROBOTICS, 60 Summary: , 60 2009 Sofia Service Oriented Architecture of Assessment Model1 Adelina Aleksieva... Assessment Model. To achieve...

353

Risk assessment and toxicology databases for health effects assessment  

SciTech Connect (OSTI)

Scientific and technological developments bring unprecedented stress to our environment. Society has to predict the results of potential health risks from technologically based actions that may have serious, far-reaching consequences. The potential for error in making such predictions or assessment is great and multiplies with the increasing size and complexity of the problem being studied. Because of this, the availability and use of reliable data is the key to any successful forecasting effort. Scientific research and development generate new data and information. Much of the scientific data being produced daily is stored in computers for subsequent analysis. This situation provides both an invaluable resource and an enormous challenge. With large amounts of government funds being devoted to health and environmental research programs and with maintenance of our living environment at stake, we must make maximum use of the resulting data to forecast and avert catastrophic effects. Along with the readily available. The most efficient means of obtaining the data necessary for assessing the health effects of chemicals is to utilize applications include the toxicology databases and information files developed at ORNL. To make most efficient use of the data/information that has already been prepared, attention and resources should be directed toward projects that meticulously evaluate the available data/information and create specialized peer-reviewed value-added databases. Such projects include the National Library of Medicine`s Hazardous Substances Data Bank, and the U.S. Air Force Installation Restoration Toxicology Guide. These and similar value-added toxicology databases were developed at ORNL and are being maintained and updated. These databases and supporting information files, as well as some data evaluation techniques are discussed in this paper with special focus on how they are used to assess potential health effects of environmental agents. 19 refs., 5 tabs.

Lu, P.Y.; Wassom, J.S. [Oak Ridge National Laboratory, TN (United States)

1990-12-31T23:59:59.000Z

354

Reliability Assessment The Reliability of the  

E-Print Network [OSTI]

2006 Long-Term Reliability Assessment The Reliability of the Bulk Power Systems In North America North American Electric Reliability Council October 2006 #12;TABLE OF CONTENTS Page 2 NERC 2006 Long-Term Reliability Assessment TABLE OF CONTENTS INTRODUCTION

355

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes March 6, 2008 Present: Diane Armpriest, Jane to the ad hoc assessment committee list, the associate dean list, and the department chair list

O'Laughlin, Jay

356

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes September 26, 2008 Present: Diane Armpriest, Alton why we assess 颅 develop meaning for work Share success stories #12;The future of the Ad Hoc

O'Laughlin, Jay

357

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes November 8, 2007 Present: Rula Awwad Rafferty timeline had been modified after input from the ad hoc assessment committee at its previous meeting

O'Laughlin, Jay

358

UK Climate Change Risk Assessment and National  

E-Print Network [OSTI]

UK Climate Change Risk Assessment and National Adaptation Programme Meg Patel Defra #12 change #12;Weather & climate impacts - economic, societal, environmental Water consumption per capita;Legislative Framework Climate Change Act 2008 Adaptation Reporting Power 2011 Climate Change Risk Assessment

Wirosoetisno, Djoko

359

Probabilistic Wind Resource Assessment and Power Predictions  

E-Print Network [OSTI]

Probabilistic Wind Resource Assessment and Power Predictions Luca Delle Monache (lucadm Accurate wind resource assessment and power forecasts and reliable quanXficaXon of their uncertainty Mo5va5on Power forecast: o Increase wind energy penetra

Firestone, Jeremy

360

Assessment of Farmland Hosting Renewable Energy Systems  

Broader source: Energy.gov [DOE]

In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

HAS TECHNOLOGY ASSESSMENT KEPT PACE WITH GLOBALIZATION?  

E-Print Network [OSTI]

HAS TECHNOLOGY ASSESSMENT KEPT PACE WITH GLOBALIZATION? bridges vol. 18, July 2008 / Pielke makers would benefit from an authoritative, independent perspective on technology assessment of renewable energy technologies; and the US Congress is considering implementing laws to regulate speculation

Colorado at Boulder, University of

362

Performance Assessment Report Domain CHP System  

E-Print Network [OSTI]

Performance Assessment Report for the Domain CHP System November 2005 By Burns & McDonnell Engineering #12;Domain CHP System Performance Assessment Report for the Packaged Cooling, Heating and Power

Oak Ridge National Laboratory

363

Special Assessment for Solar Energy Systems  

Broader source: Energy.gov [DOE]

Illinois offers a special assessment of solar energy systems for property-tax purposes. For property owners who register with a chief county assessment officer, solar energy equipment is valued at...

364

Wind Resource Assessment in Europe Using Emergy  

E-Print Network [OSTI]

of wind turbine assessment based on energy, exergy, LCA andLCA and emergy) in the case of sustainability assessment of windLCA does. In emergy analysis, direct and indirect inputs of wind

Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

2014-01-01T23:59:59.000Z

365

Local Option- Property Assessed Clean Energy  

Broader source: Energy.gov [DOE]

Property-Assessed Clean Energy (PACE) financing effectively allows property owners to borrow money to pay for energy improvements. The amount borrowed is repaid via a special assessment on the...

366

Performance Assessment Community of Practice Technical Exchange  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interagency Performance and Risk Assessment Community of Practice The Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) was formed to provide a forum to...

367

RISK ASSESSMENT TECHNICAL EXPERT WORKING GROUP  

Broader source: Energy.gov [DOE]

The Risk Assessment Technical Expert Working Group (RWG) is established to assist the Department of Energy (DOE) with the appropriate and effective use of quantitative risk assessment in nuclear...

368

Quality assessment: A performance-based approach to assessments  

SciTech Connect (OSTI)

Revision C to US Department of Energy (DOE) Order 5700.6 (6C) ``Quality Assurance`` (QA) brings significant changes to the conduct of QA. The Westinghouse government-owned, contractor-operated (GOCO) sites have updated their quality assurance programs to the requirements and guidance of 6C, and are currently implementing necessary changes. In late 1992, a Westinghouse GOCO team led by the Waste Isolation Division (WID) conducted what is believed to be the first assessment of implementation of a quality assurance program founded on 6C.

Caplinger, W.H.; Greenlee, W.D.

1993-08-01T23:59:59.000Z

369

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 <Ones |Laboratory, JuneDid31-2, REV.Self-Assessment

370

Total System Performance Assessment Peer Review Panel  

Broader source: Energy.gov [DOE]

Total System Performance Assessment (TSPA) Peer Review Panel for predicting the performance of a repository at Yucca Mountain.

371

Enterprise Assessments Operational Awareness Record, Argonne...  

Energy Savers [EERE]

Operational Awareness Record, Argonne National Laboratory and New Brunswick Laboratory - March 2015 Enterprise Assessments Operational Awareness Record, Argonne National Laboratory...

372

Articles about Resource Assessment and Characterization  

Broader source: Energy.gov [DOE]

Stories about resource assessment and characterization featured by the U.S. Department of Energy (DOE) Wind Program.

373

Sandia National Laboratories: Solar Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tagged with: Energy * photovoltaic * Photovoltaics * PV * Renewable Energy * solar * Solar Energy * Solar Research * Solar Resource Assessment Comments are closed. Renewable...

374

EM Performs Tenth Technology Readiness Assessment  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006.

375

EPA`s risk assessment guidelines: Overview  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) risk assessment guidelines for cancer, quantification, and exposure issues are discussed.

Patton, D.E. [Environmental Protection Agency, Washington, DC (United States)

1990-12-31T23:59:59.000Z

376

Student Photos (utilizing bASSESS)-  

E-Print Network [OSTI]

listing. #12;Student Photos (utilizing bASSESS)- Step 10 路 The next screen provides the followingStudent Photos (utilizing bASSESS)- Step 1 路 Access Banner web page from the UTHSC homepage. #12;Student Photos (utilizing bASSESS)- Step 2 路 Click "Self-Service Login." #12;Student Photos (utilizing b

Cui, Yan

377

UNIVERSITY OF IDAHO STUDENT/ PROGRAMS ASSESSMENT  

E-Print Network [OSTI]

for the Year 2005-06 Annual Report, 1/2005-6/2006 #12;2 TABLE OF CONTENTS I. Assessment in 2005-06 ......................................................................................................................................... 34 #12;1 ANNUAL ASSESSMENT REPORT, 2006 I. Assessment in 2005-06 Effective teaching and learning

O'Laughlin, Jay

378

European Climate Assessment & Dataset Report 2008  

E-Print Network [OSTI]

European Climate Assessment & Dataset Report 2008 ECA&D 路 路 路 路 European Climate Assessment & Dataset (ECA&D) Report 2008 "Towards an operational system for assessing observed changes in climate & Dataset Report 2008 ECA&D 路 路 路 路 Aryan van Engelen, Albert Klein Tank, Gerard van de Schrier and Lisette

Stoffelen, Ad

379

Pacific Northwest Power Supply Adequacy Assessment  

E-Print Network [OSTI]

), the LOLP rises to about 11 percent. The Council's adequacy assessment only counts existing resources and planned resources that are already sited and licensed for operation in the year assessed. There are other years that is not included in this assessment. #12;3 The Resource Adequacy Standard and What it Means

380

QEP WORKING GROUP CHARGES Assessment Working Group  

E-Print Network [OSTI]

and a framework that details timelines, leadership, resource allocation, and an assessment plan that is clearlyQEP WORKING GROUP CHARGES Assessment Working Group The topic of the QEP should fit should be supported by a thorough understanding of the institutional context and by assessment data

Liu, Paul

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

UW SCHOOL OF PHARMACY ASSESSMENT COMMITTEE  

E-Print Network [OSTI]

, staff Resource People Paul Hutson Emily Tarter For 2013-2014, the Assessment Committee is charged to: 1UW SCHOOL OF PHARMACY ASSESSMENT COMMITTEE 2013-2014 Committee Members Beth Martin (chair) Sarah/Toxicology Admissions/ Oversight Committees, complete the Programmatic Evaluation and Educational Assessment Plan prior

Sheridan, Jennifer

382

Medical Surveillance n Based on risk assessment  

E-Print Network [OSTI]

Surveillance Risk Assessment 2.12 #12;n Top management n overall safety policy n resource allocation n2.12 #12;Medical Surveillance Criteria n Based on risk assessment n Pre-placement n evaluate of numbers exists n Predict an outcome given similar events Medical Surveillance Risk Assessment 2.12 #12;n

Collins, Gary S.

383

STOCK ASSESSMENT PRINCIPLES AND TERMS appendix 4  

E-Print Network [OSTI]

assessment is a report that often includes an estimation of the amount or abundance of the resource to determine what ac- tions are needed to promote the best use of our living marine resources. Stock assessment with commercial and recreational catch data to assess the resource base. The final critical data comes from

384

Assessment of University Sustainability Activities SUSTAINABILITY TRACKING,  

E-Print Network [OSTI]

Assessment of University Sustainability Activities under the SUSTAINABILITY TRACKING, ASSESSMENT Rashed-Ali, PhD. Prepared for: The UTSA Sustainability Council May 3rd , 2011 #12;yhd/s ^hDD Zz 2 | P a g-Ali, Assistant Professor in the College of Architecture, conducted a survey and assessment of UTSA sustainability

Dodla, Ramana

385

Owyhee Subbasin Plan Chapter 2 Technical Assessment  

E-Print Network [OSTI]

Technical Assessment. Steven C. Vigg, Editor. Final Draft. Submitted to the Northwest Power and ConservationOwyhee Subbasin Plan Chapter 2 Technical Assessment Prepared By: The Shoshone-Paiute Tribes Program. #12;Owyhee Subbasin Plan Chapter 2 OSP Technical Assessment Final Draft May 28, 2004i Document

386

Corral Monitoring System assessment results  

SciTech Connect (OSTI)

This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

Filby, E.E.; Haskel, K.J.

1998-03-01T23:59:59.000Z

387

Assessment of government tribology programs  

SciTech Connect (OSTI)

An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

Peterson, M.B.; Levinson, T.M.

1985-09-01T23:59:59.000Z

388

Importance of life cycle assessment  

SciTech Connect (OSTI)

The paper presents Life Cycle Assessment (LCA) as a tool to assist the waste professional with integrated waste management. LCA can be the connection between the waste professional and designer/producer to permit the waste professional to encourage the design of products so material recovery is most efficient and markets can be better predicted. The waste professional can better monitor the involvement of the consumer in waste management by using LCA and looking upstream at how the consumer actually reacts to products and packaging. LCA can also help the waste professional better understand the waste stream.

Bridges, J.S.

1994-06-16T23:59:59.000Z

389

Assessment of Residential GSHP System  

SciTech Connect (OSTI)

This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

Liu, Xiaobing [ORNL

2010-09-01T23:59:59.000Z

390

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 EastMaine: Energy Resources JumpAspen Aerogels Jump to: navigation,SolarAssess

391

Groundwater Data Package for Hanford Assessments  

SciTech Connect (OSTI)

This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management and Integration Project (#47043).

Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.; Freedman, Vicky L.

2006-01-31T23:59:59.000Z

392

NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool  

E-Print Network [OSTI]

NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool Air Quality Assessment Tool For Livestock Producers & Advisors #12;NAQSAT The National Air Quality Site Assessment Tool (NAQSAT) was developed for livestock producers and their advisors interested

393

Assessment Design The unit coordinator is responsible for designing effective, efficient assessment tasks. There are  

E-Print Network [OSTI]

2 Assessment Design The unit coordinator is responsible for designing effective, efficient influence student retention and study success if done effectively. Assessment load The number of summative task? What is the timing of assessment demands and due dates in relation to those for assessments

394

Fossil energy materials needs assessment  

SciTech Connect (OSTI)

An assessment of needs for materials of construction for fossil energy systems was prepared by ORNL staff members who conducted a literature search and interviewed various individuals and organizations that are active in the area of fossil energy technology. Critical materials problems associated with fossil energy systems are identified. Background information relative to the various technologies is given and materials research needed to enhance the viability and improve the economics of fossil energy processes is discussed. The assessment is presented on the basis of materials-related disciplines that impact fossil energy material development. These disciplines include the design-materials interface, materials fabrication technology, corrosion and materials compatibility, wear phenomena, ceramic materials, and nondestructive testing. The needs of these various disciplines are correlated with the emerging fossil energy technologies that require materials consideration. Greater emphasis is given to coal technology - particularly liquefaction, gasification, and fluidized bed combustion - than to oil and gas technologies because of the perceived inevitability of US dependence on coal conversion and utilization systems as a major part of our total energy production.

King, R.T.; Judkins, R.R. (comps.)

1980-07-01T23:59:59.000Z

395

Assessing the Security Vulnerabilities of Correctional Facilities  

SciTech Connect (OSTI)

The National Institute of Justice has tasked their Satellite Facility at Sandia National Laboratories and their Southeast Regional Technology Center in Charleston, South Carolina to devise new procedures and tools for helping correctional facilities to assess their security vulnerabilities. Thus, a team is visiting selected correctional facilities and performing vulnerability assessments. A vulnerability assessment helps to identi~ the easiest paths for inmate escape, for introduction of contraband such as drugs or weapons, for unexpected intrusion fi-om outside of the facility, and for the perpetration of violent acts on other inmates and correctional employees, In addition, the vulnerability assessment helps to quantify the security risks for the facility. From these initial assessments will come better procedures for performing vulnerability assessments in general at other correctional facilities, as well as the development of tools to assist with the performance of such vulnerability assessments.

Morrison, G.S.; Spencer, D.S.

1998-10-27T23:59:59.000Z

396

Property-Assessed Clean Energy Programs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Financing Financing Structures Property-Assessed Clean Energy Programs Property-Assessed Clean Energy Programs The property-assessed clean energy (PACE) model is an...

397

CRAD, Conduct of Operations Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations Assessment Plan CRAD, Conduct of Operations Assessment Plan Performance Objective: The purpose of this assessment is to verify programmatic implementation of...

398

PG&E Reconductoring Project Biological Assessment (Revised) ...  

Broader source: Energy.gov (indexed) [DOE]

PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (1216...

399

Oak Ridge Reservation Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge Reservation Needs Assessment Oak Ridge Reservation Needs Assessment December 1997 This Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security...

400

Assessments of biofuel sustainability: air pollution and health impacts  

E-Print Network [OSTI]

in Brazil through life- cycle assessment (LCA), and findin Brazil through life-cycle assessment (LCA), and findLCA inventory: How this affects Life Cycle impact Assessment.

Tsao, Chi-Chung

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Geographically Differentiated Life-cycle Impact Assessment of Human Health  

E-Print Network [OSTI]

indicators in life-cycle assessment (LCA). Human Ecologicalindicators in life-cycle assessment (LCA). Human EcologicalI explore how life-cycle assessment (LCA) results can

Humbert, Sebastien

2009-01-01T23:59:59.000Z

402

Assessment of Energy Production Potential from Tidal Streams...  

Office of Environmental Management (EM)

technology. 1023527.pdf More Documents & Publications EA-1949: FERC Draft Environmental Assessment EA-1949: FERC Final Environmental Assessment Tidal Energy Resource Assessment...

403

assessing phytochemical intake: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at Berkeley, University of 342 Environmental assessment of electricity scenarios with Life Cycle Assessment Physics Websites Summary: impacts assessment of scenarios is very...

404

NGNP SITE 2 HAZARDS ASSESSMENT  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

Wayne Moe

2011-10-01T23:59:59.000Z

405

U.S. Energy Information Administration (EIA) - Sector  

Gasoline and Diesel Fuel Update (EIA)

AEO2012 (as of January 1, 2010) EUR (billion cubic feet per well) Assessment UnitState Area (square miles) Well spacing (wells per square mile) Percent of area untested Percent of...

406

Communicating Performance Assessments Results - 13609  

SciTech Connect (OSTI)

The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)

Layton, Mark [Savannah River Remediation LLC, Building 705-1C, Aiken, SC 29808 (United States)] [Savannah River Remediation LLC, Building 705-1C, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

407

Assessment of Centerville powerhouse penstocks  

SciTech Connect (OSTI)

Pacific Gas & Electric Company (PG&E) has performed an assessment of the Centerville Powerhouse penstocks to determine their acceptability for continued long term service throughout the remaining 20 years of the project license. Preliminary penstock investigations were aimed at determining continued short term serviceability (5 years) through the end of construction of a new Centerville plant. Based on project economics, PG&E evaluated cancelling construction of the new plant and continuing operation of the existing Centerville Powerhouse. The preliminary studies were determined to be of insufficient detail for judging the penstocks` fitness for continued long term operation. Therefore, PG&E embarked upon a more detailed study. The acceptability of the Centerville penstocks for long term continued operation hinged mainly on the performance and reliability of the powerhouse control equipment and its ability to limit pressure rises, the material properties of the penstock shell, and the extent of erosion/corrosion and pitting within the penstock walls.

Ahlgren, C.S.; Regan, P.J. [Pacific Gas & Electric Co., San Francisco, CA (United States); Mattson, R.A. [Structural Integrity Associates, Inc., San Jose, CA (United States)] [and others

1995-12-31T23:59:59.000Z

408

Territorial energy assessment. Final report  

SciTech Connect (OSTI)

This assessment is concerned with energy planning for the governments of the American territories of Guam and American Samoa, and of the four nations that are now emerging from the United Nations Trust Territory of the Pacific Islands: the Commonwealth of the Northern Mariana Islands, the Republic of the Marshall Islands, the Republic of Palau, and the Federated States of Micronesia. This study was directed by the United States Congress under Public Law 96-597, and carried out by the United States Department of Energy in cooperation with the respective island governments. This report addressed the current and future energy needs of the island governments and considers the feasibility of employing alternate sources of energy, especially indigenous renewable energy resources, to reduce dependence on petroleum-based fuels.

Not Available

1982-12-01T23:59:59.000Z

409

Environmental assessment and social justice  

SciTech Connect (OSTI)

The purpose of this document is to describe an approach to assessing environmental justice issues at the start of proposed project. It is a structural approach to screening using readily available census data and commercial products that emphasizes the ability to replicate results and provide systematic data that can be used to identify spatial inequities. While our discussion of the methodology addresses only public health and safety issues related to certain minority and cohort sub-groups, systematic use of methodology could provide a valuable screening tool for identifying impacts particular to low-income groups. While the assumptions can be questioned as to applicability, they are based both on theory and practical knowledge.

Vogt, B.M.; Sorensen, J.H. [Oak Ridge National Lab., TN (United States); Hardee, H. [Tennessee Univ., Knoxville, TN (United States)

1995-03-01T23:59:59.000Z

410

Simulation Enabled Safeguards Assessment Methodology  

SciTech Connect (OSTI)

It is expected that nuclear energy will be a significant component of future supplies. New facilities, operating under a strengthened international nonproliferation regime will be needed. There is good reason to believe virtual engineering applied to the facility design, as well as to the safeguards system design will reduce total project cost and improve efficiency in the design cycle. Simulation Enabled Safeguards Assessment MEthodology (SESAME) has been developed as a software package to provide this capability for nuclear reprocessing facilities. The software architecture is specifically designed for distributed computing, collaborative design efforts, and modular construction to allow step improvements in functionality. Drag and drop wireframe construction allows the user to select the desired components from a component warehouse, render the system for 3D visualization, and, linked to a set of physics libraries and/or computational codes, conduct process evaluations of the system they have designed.

Robert Bean; Trond Bjornard; Thomas Larson

2007-09-01T23:59:59.000Z

411

Fort Drum integrated resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

412

Griffiss AFB integrated resource assessment  

SciTech Connect (OSTI)

The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

1993-02-01T23:59:59.000Z

413

A Review of Quantitative Approaches to Intelligent Building Assessment  

E-Print Network [OSTI]

This paper provides a review of the assessment methods of intelligent buildings (IBs). Based on a review of rating method currently used for building assessment, 6 rating systems for IB assessment are compared according to assessment clusters...

Chen, Z.; Clements-Croome, D. J.; Hong, J.; Li, H.; Xu, Q.

2006-01-01T23:59:59.000Z

414

The efficiency of environmental impact assessments relating to noise issues  

E-Print Network [OSTI]

The efficiency of environmental impact assessments relating to noise issues Z. Krukle University of environmental impact assessments (EIA) relating to noise issues. The goal is attained through evaluation, effectiveness, environmental impact assessment, noise 1 Introduction Environmental impact assessment (EIA

Paris-Sud XI, Universit茅 de

415

Geologic technical assessment of the Stratton Ridge salt dome, Texas, for potential expansion of the U.S. strategic petroleum reserve.  

SciTech Connect (OSTI)

The Stratton Ridge salt dome is a large salt diapir located only some ten miles from the currently active Strategic Petroleum Reserve Site at Bryan Mound, Texas. The dome is approximately 15 miles south-southwest of Houston. The Stratton Ridge salt dome has been intensively developed, in the desirable central portions, with caverns for both brine production and product storage. This geologic technical assessment indicates that the Stratton Ridge salt dome may be considered a viable, if less-than-desirable, candidate site for potential expansion of the Strategic Petroleum Reserve (SPR). Past development of underground caverns significantly limits the potential options for use by the SPR. The current conceptual design layout of proposed caverns for such an expansion facility is based upon a decades-old model of salt geometry, and it is unacceptable, according to this reinterpretation of salt dome geology. The easternmost set of conceptual caverns are located within a 300-ft buffer zone of a very major boundary shear zone, fault, or other structural feature of indeterminate origin. This structure transects the salt stock and subdivides it into an shallow western part and a deeper eastern part. In places, the distance from this structural boundary to the design-basis caverns is as little as 150 ft. A 300-ft distance from this boundary is likely to be the minimum acceptable stand-off, from both a geologic and a regulatory perspective. Repositioning of the proposed cavern field is possible, as sufficient currently undeveloped salt acreage appears to be available. However, such reconfiguration would be subject to limitations related to land-parcel boundaries and other existing infrastructure and topographic constraints. More broadly speaking, the past history of cavern operations at the Stratton Ridge salt dome indicates that operation of potential SPR expansion caverns at this site may be difficult, and correspondingly expensive. Although detailed information is difficult to come by, widely accepted industry rumors are that numerous existing caverns have experienced major operational problems, including salt falls, sheared casings, and unintended releases of stored product(s). Many of these difficulties may be related to on-going differential movement of individual salt spines or to lateral movement at the caprock-salt interface. The history of operational problems, only some of which appear to be a matter of public record, combined with the potential for encountering escaped product from other operations, renders the Stratton Ridge salt dome a less-than-desirable site for SPR purposes.

Rautman, Christopher Arthur; Snider, Anna C.; Looff, Karl M. (Geologic Consultant, Lovelady, TX)

2006-11-01T23:59:59.000Z

416

A Resilient Condition Assessment Monitoring System  

SciTech Connect (OSTI)

An architecture and supporting methods are presented for the implementation of a resilient condition assessment monitoring system that can adaptively accommodate both cyber and physical anomalies to a monitored system under observation. In particular, the architecture includes three layers: information, assessment, and sensor selection. The information layer estimates probability distributions of process variables based on sensor measurements and assessments of the quality of sensor data. Based on these estimates, the assessment layer then employs probabilistic reasoning methods to assess the plant health. The sensor selection layer selects sensors so that assessments of the plant condition can be made within desired time periods. Resilient features of the developed system are then illustrated by simulations of a simplified power plant model, where a large portion of the sensors are under attack.

Humberto Garcia; Wen-Chiao Lin; Semyon M. Meerkov

2012-08-01T23:59:59.000Z

417

EA-1836: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1836: Final Environmental Assessment Norwich Cogeneration Initiative, Norwich, Connecticut The DOE National Energy Technology Laboratory (NETL)...

418

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Broader source: Energy.gov (indexed) [DOE]

Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

419

EA-1138: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1138: Final Environmental Assessment Proposed Energy Conservation Standards for Refrigerators, Refrigerator-Freezers, and Freezers This Environmental Assessment (EA)...

420

EA-1705: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Industrial Assessment Center (IAC) at Lehigh University  

SciTech Connect (OSTI)

During the period September, 2001, through August, 2006, the Lehigh University Industrial Assessment Center provided assessments for 147 companies in the Eastern Pennsylvania and New Jersey. In reports sent to the companies, a total of 1,079 assessment recommendations were suggested, with an annual cost savings of $22,980,654, to save energy, reduce waste, and improve productivity. The energy saved if all ARs were implemented would be 1,843,202 MMBtu.

Sudhakar Neti and Alparslan Oztekin

2007-07-10T23:59:59.000Z

422

Fort Drum integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

423

Motivation Literature Trans. Networks and Emissions Assessment Indices Link Importance Numerical Examples Summary a Environmental Impact Assessment of  

E-Print Network [OSTI]

Examples Summary a Environmental Impact Assessment of Transportation Networks with Degradable Links Environmental Impact Assessment Indices #12;Motivation Literature Trans. Networks and Emissions Assessment is gratefully acknowledged. Anna Nagurney, Qiang Qiang,, Ladimer S. Nagurney Environmental Impact Assessment

Nagurney, Anna

424

Joint environmental assessment for western NPR-1 3-dimensional seismic project at Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect (OSTI)

The Department of Energy (DOE), in conjunction with the Bureau of Land Management (BLM), has prepared an Environmental Assessment (DOE/EA-1124) to identify and evaluate the potential environmental impacts of the proposed geophysical seismic survey on and adjacent to the Naval Petroleum Reserve No.1 (NPR-1), located approximately 35 miles west of Bakersfield, California. NPR-1 is jointly owned and operated by the federal government and Chevron U.S.A. Production Company. The federal government owns about 78 percent of NPR-1, while Chevron owns the remaining 22 percent. The government`s interest is under the jurisdiction of DOE, which has contracted with Bechtel Petroleum Operations, Inc. (BPOI) for the operation and management of the reserve. The 3-dimensional seismic survey would take place on NPR-1 lands and on public and private lands adjacent to NPR-1. This project would involve lands owned by BLM, California Department of Fish and Game (CDFG), California Energy Commission (CEC), The Nature Conservancy, the Center for Natural Lands Management, oil companies (Chevron, Texaco, and Mobil), and several private individuals. The proposed action is designed to provide seismic data for the analysis of the subsurface geology extant in western NPR-1 with the goal of better defining the commercial limits of a currently producing reservoir (Northwest Stevens) and three prospective hydrocarbon bearing zones: the {open_quotes}A Fan{close_quotes} in Section 7R, the 19R Structure in Section 19R, and the 13Z Structure in Section 13Z. Interpreting the data is expected to provide NPR-1 owners with more accurate locations of structural highs, faults, and pinchouts to maximize the recovery of the available hydrocarbon resources in western NPR-1. Completion of this project is expected to increase NPR-1 recoverable reserves, and reduce the risks and costs associated with further exploration and development in the area.

NONE

1996-05-01T23:59:59.000Z

425

Application of Cutting-Edge 3D Seismic Attribute Technology to the Assessment of Geological Reservoirs for CO2 Sequestration  

SciTech Connect (OSTI)

The goals of this project were to develop innovative 3D seismic attribute technologies and workflows to assess the structural integrity and heterogeneity of subsurface reservoirs with potential for CO{sub 2} sequestration. Our specific objectives were to apply advanced seismic attributes to aide in quantifying reservoir properies and lateral continuity of CO{sub 2} sequestration targets. Our study area is the Dickman field in Ness County, Kansas, a type locality for the geology that will be encountered for CO{sub 2} sequestration projects from northern Oklahoma across the U.S. midcontent to Indiana and beyond. Since its discovery in 1962, the Dickman Field has produced about 1.7 million barrels of oil from porous Mississippian carbonates with a small structural closure at about 4400 ft drilling depth. Project data includes 3.3 square miles of 3D seismic data, 142 wells, with log, some core, and oil/water production data available. Only two wells penetrate the deep saline aquifer. Geological and seismic data were integrated to create a geological property model and a flow simulation grid. We systematically tested over a dozen seismic attributes, finding that curvature, SPICE, and ANT were particularly useful for mapping discontinuities in the data that likely indicated fracture trends. Our simulation results in the deep saline aquifer indicate two effective ways of reducing free CO{sub 2}: (a) injecting CO{sub 2} with brine water, and (b) horizontal well injection. A tuned combination of these methods can reduce the amount of free CO{sub 2} in the aquifer from over 50% to less than 10%.

Christopher Liner; Jianjun Zeng; Po Geng Heather King Jintan Li; Jennifer Califf; John Seales

2010-03-31T23:59:59.000Z

426

Environmental assessment of ground water compliance activities at the Uranium Mill Tailings Site, Spook, Wyoming. Revision 0  

SciTech Connect (OSTI)

This document is an environmental assessment of the Spook, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site. It analyzes the impacts of the U.S. Department of Energy (DOE) proposed action for ground water compliance. The proposed action is to comply with the U.S. Environmental Protection Agency (EPA) standards for the UMTRA Project sites (40 CFR Part 192) by meeting supplemental standards based on the limited use ground water at the Spook site. This proposed action would not require site activities, including ground water monitoring, characterization, or institutional controls. Ground water in the uppermost aquifer was contaminated by uranium processing activities at the Spook site, which is in Converse County, approximately 48 miles (mi) (77 kilometers [km]) northeast of Casper, Wyoming. Constituents from the site infiltrated and migrated into the uppermost aquifer, forming a plume that extends approximately 2500 feet (ft) (800 meters [m]) downgradient from the site. The principal site-related hazardous constituents in this plume are uranium, selenium, and nitrate. Background ground water in the uppermost aquifer at the site is considered limited use. It is neither a current nor a potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed in public water supply systems (40 CFR {section} 192.11 (e)). Background ground water quality also is poor due to first, naturally occurring conditions (natural uranium mineralization associated with an alteration front), and second, the effects of widespread human activity not related to uranium milling operations (uranium exploration and mining activities). There are no known exposure pathways to humans, animals, or plants from the contaminated ground water in the uppermost aquifer because it does not discharge to lower aquifers, to the surface, or to surface water.

NONE

1996-03-01T23:59:59.000Z

427

Assessment of Dissolved Oxygen Mitigation at Hydropower Dams Using an Integrated Hydrodynamic/Water Quality/Fish Growth Model  

SciTech Connect (OSTI)

Dissolved oxygen (DO) in rivers is a common environmental problem associated with hydropower projects. Approximately 40% of all FERC-licensed projects have requirements to monitor and/or mitigate downstream DO conditions. Most forms of mitigation for increasing DO in dam tailwaters are fairly expensive. One area of research of the Department of Energy's Hydropower Program is the development of advanced turbines that improve downstream water quality and have other environmental benefits. There is great interest in being able to predict the benefits of these modifications prior to committing to the cost of new equipment. In the case of turbine replacement or modification, there is a need for methods that allow us to accurately extrapolate the benefits derived from one or two turbines with better design to the replacement or modification of all turbines at a site. The main objective of our study was to demonstrate a modeling approach that integrates the effects of flow and water quality dynamics with fish bioenergetics to predict DO mitigation effectiveness over long river segments downstream of hydropower dams. We were particularly interested in demonstrating the incremental value of including a fish growth model as a measure of biological response. The models applied are a suite of tools (RMS4 modeling system) originally developed by the Tennessee Valley Authority for simulating hydrodynamics (ADYN model), water quality (RQUAL model), and fish growth (FISH model) as influenced by DO, temperature, and available food base. We parameterized a model for a 26-mile reach of the Caney Fork River (Tennessee) below Center Hill Dam to assess how improvements in DO at the dam discharge would affect water quality and fish growth throughout the river. We simulated different types of mitigation (i.e., at the turbine and in the reservoir forebay) and different levels of improvement. The model application successfully demonstrates how a modeling approach like this one can be used to assess whether a prescribed mitigation is likely to meet intended objectives from both a water quality and a biological resource perspective. These techniques can be used to assess the tradeoffs between hydropower operations, power generation, and environmental quality.

Bevelhimer, Mark S [ORNL; Coutant, Charles C [ORNL

2006-07-01T23:59:59.000Z

428

Independent Oversight Assessment, Portsmouth/Paducah Project...  

Broader source: Energy.gov (indexed) [DOE]

Project Office - May 2012 May 2012 Assessment of the PortsmouthPaducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants...

429

Enterprise Assessments, Lessons Learned from Targeted Reviews...  

Energy Savers [EERE]

purpose of these targeted assessments was to evaluate the flowdown of occupational radiation protection program requirements into work planning, control, and execution...

430

Enterprise Assessments Targeted Review, Argonne National Laboratory...  

Energy Savers [EERE]

Targeted Review, Argonne National Laboratory - November 2014 Enterprise Assessments Targeted Review, Argonne National Laboratory - November 2014 November 2014 Review of the...

431

Technical Position, Regarding Acceptable Methods for Assessing...  

Broader source: Energy.gov (indexed) [DOE]

for Assessing and Recording Radiation Doses to Individuals More Documents & Publications Radiation Exposure Monitoring Systems Data Reporting Guide Annual DOE Occupational...

432

Assessing Climate Change Impacts, Vulnerability and Adaptation...  

Open Energy Info (EERE)

The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan...

433

Lawrence Livermore National Laborotory Safety Basis Assessment...  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore National Laboratory Safety Basis Assessment INTRODUCTION This site visit report documents the collective results of the review of Lawrence Livermore National...

434

PRIVACY IMPACT ASSESSMENT: OCIO HSPD-12 Physical  

Energy Savers [EERE]

OCIO - HSPD-12 Physical and Logical System PIA Template Version 4- June, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE...

435

Water resource opportunity assessment: Fort Dix  

SciTech Connect (OSTI)

This report provides the results of the water resource opportunity assessments performed by Pacific Northwest National Laboratory at the Fort Dix facility located in Fort Dix, New Jersey.

Sullivan, G.P.; Hostick, D.J.; Elliott, D.B.; Fitzpatrick, Q.K.; Dahowski, R.T.; Dison, D.R

1996-12-01T23:59:59.000Z

436

Enterprise Assessments Operational Awareness Record, Waste Treatment...  

Office of Environmental Management (EM)

tables. The review was conducted June 2-19, 2014. Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 More Documents &...

437

Enterprise Assessments Operational Awareness Record, Waste Isolation...  

Energy Savers [EERE]

Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015...

438

City of Aspen- Energy Assessment Rebate Program  

Broader source: Energy.gov [DOE]

The City of Aspen encourages interested residents and businesses to increase the energy efficiency of homes and offices through the Energy Assessment Program. Participating homes and offices must...

439

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

440

Industrial Assessment Centers Help Students, Communities Learn...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Another Industrial Assessment Center Student Success Story Dayakar Devaru, University of West Virginia graduate student, named Outstanding IAC Engineering Student for his...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Functional cardiovascular assessment in congenital heart disease.  

E-Print Network [OSTI]

??abstractAdequate and serial functional cardiovascular assessment is important in patients with congenital heart disease because many show disruption of normal myocardial geometry, which may or (more)

W.J.B.W. van den Berg

2007-01-01T23:59:59.000Z

442

Independent Oversight Assessment, Los Alamos National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

April 2012 Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project This report provides the results of an...

443

Independent Oversight Assessment, Idaho Cleanup Project Sodium...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This...

444

Independent Oversight Assessment, DOE Office of Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management...

445

OFFICE ERGONOMICS A Self-Assessment  

E-Print Network [OSTI]

OFFICE ERGONOMICS A Self-Assessment Guide Environmental Health and Safety Office safety, along with additional information on ergonomics, is also available through the Dalhousie Safety Office

Brownstone, Rob

446

Solar Schools Assessment and Implementation Project: Financing...  

Broader source: Energy.gov (indexed) [DOE]

on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools This report focuses on financial options developed...

447

Microsoft Word - Fish Impact Assessment 070512.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

K Fish Habitat and Fish Population Impacts ASSESSMENT OF RELATIVE FISH HABITAT AND FISH POPULATION IMPACTS OF I-5 CORRIDOR REINFORCEMENT PROJECT ALTERNATIVES AND OPTIONS Report to:...

448

Independent Oversight Assessment, Salt Waste Processing Facility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department...

449

Bureau of Land Management's Environmental Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Management's Environmental Assessment - T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada Bureau...

450

Conceptualising the effectiveness of impact assessment processes  

SciTech Connect (OSTI)

This paper aims at conceptualising the effectiveness of impact assessment processes through the development of a literature-based framework of criteria to measure impact assessment effectiveness. Four categories of effectiveness were established: procedural, substantive, transactive and normative, each containing a number of criteria; no studies have previously brought together all four of these categories into such a comprehensive, criteria-based framework and undertaken systematic evaluation of practice. The criteria can be mapped within a cycle/or cycles of evaluation, based on the 憀ogic model, at the stages of input, process, output and outcome to enable the identification of connections between the criteria across the categories of effectiveness. This framework is considered to have potential application in measuring the effectiveness of many impact assessment processes, including strategic environmental assessment (SEA), environmental impact assessment (EIA), social impact assessment (SIA) and health impact assessment (HIA). -- Highlights: Conceptualising effectiveness of impact assessment processes. Identification of factors influencing effectiveness of impact assessment processes. Development of criteria within a framework for evaluating IA effectiveness. Applying the logic model to examine connections between effectiveness criteria.

Chanchitpricha, Chaunjit, E-mail: chaunjit@g.sut.ac.th [School of Environmental Health, Suranaree University of Technology, 111 University Avenue, Maung District, Nakhon Ratchasima 30000 (Thailand)] [School of Environmental Health, Suranaree University of Technology, 111 University Avenue, Maung District, Nakhon Ratchasima 30000 (Thailand); Bond, Alan, E-mail: alan.bond@uea.ac.uk [School of Environmental Sciences, University of East Anglia, Norwich NR4 7TJ (United Kingdom) [School of Environmental Sciences, University of East Anglia, Norwich NR4 7TJ (United Kingdom); Unit for Environmental Sciences and Management School of Geo and Spatial Sciences, Internal Box 375, North West University (Potchefstroom campus) (South Africa)

2013-11-15T23:59:59.000Z

451

BIOMEDICAL AND HEALTH Assessing the Environmental, Health  

E-Print Network [OSTI]

BIOMEDICAL AND HEALTH Assessing the Environmental, Health and Safety Impact of Nanoparticles- proaching the sensitivity limit for most instruments. #12;BIOMEDICAL AND HEALTH A colloidal nanoparticle

Magee, Joseph W.

452

E-Area Performance Assessment Interim Measures Assessment FY2005  

SciTech Connect (OSTI)

After major changes to the limits for various disposal units of the E-Area Low Level Waste Facility (ELLWF) last year, no major changes have been made during FY2005. A Special Analysis was completed which removes the air pathway {sup 14}C limit from the Intermediate Level Vault (ILV). This analysis will allow the disposal of reactor moderator deionizers which previously had no pathway to disposal. Several studies have also been completed providing groundwater transport input for future special analyses. During the past year, since Slit Trenches No.1 and No.2 were nearing volumetric capacity, they were operationally closed under a preliminary closure analysis. This analysis was performed using as-disposed conditions and data and showed that concrete rubble from the demolition of 232-F was acceptable for disposal in the STs even though the latest special analysis for the STs had reduced the tritium limits so that the inventory in the rubble exceeded limits. A number of special studies are planned during the next years; perhaps the largest of these will be revision of the Performance Assessment (PA) for the ELLWF. The revision will be accomplished by incorporating special analyses performed since the last PA revision as well as revising analyses to include new data. Projected impacts on disposal limits of more recent studies have been estimated. No interim measures will be applied during this year. However, it is being recommended that tritium disposals to the Components-in-Grout (CIG) Trenches be suspended until a limited Special Analysis (SA) currently in progress is completed. This SA will give recommendations for optimum placement of tritiated D-Area tower waste. Further recommendations for tritiated waste placement in the CIG Trenches will be given in the upcoming PA revision.

Stallings, M

2006-01-31T23:59:59.000Z

453

Dynamical systems probabilistic risk assessment.  

SciTech Connect (OSTI)

Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

Denman, Matthew R.; Ames, Arlo Leroy

2014-03-01T23:59:59.000Z

454

Live Fire Range Environmental Assessment  

SciTech Connect (OSTI)

The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

None

1993-08-01T23:59:59.000Z

455

Fort Drum integrated resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

456

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network [OSTI]

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

457

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies  

SciTech Connect (OSTI)

This survey of biomass resource assessments and assessment capabilities in Asia-Pacific Economic Cooperation (APEC) economies considered various sources: academic and government publications, media reports, and personal communication with contacts in member economies.

Milbrandt, A.; Overend, R. P

2008-11-01T23:59:59.000Z

458

Hydraulic Fracturing in Michigan Integrated Assessment  

E-Print Network [OSTI]

Hydraulic Fracturing in Michigan Integrated Assessment #12;Agenda 路 Welcome and introduction and timeline 路 Panel presentation and discussion 路 Facilitated Q & A 路 Closing remarks #12;Hydraulic Fracturing 路 Leverages resources IA BENEFITS Benefits of Integrated Assessment #12;Key Points: 路 Hydraulic Fracturing (HF

Kamat, Vineet R.

459

Reliability Assessment Using Discriminative Sampling and Metamodeling  

E-Print Network [OSTI]

1 05M-400 Reliability Assessment Using Discriminative Sampling and Metamodeling G. Gary Wang Dept ABSTRACT Reliability assessment is the foundation for reliability engineering and reliability-based design optimization. It has been a difficult task, however, to perform both accurate and efficient reliability

Wang, Gaofeng Gary

460

MSU Departmental Assessment Plan Department: Computer Science  

E-Print Network [OSTI]

MSU Departmental Assessment Plan 2007-2009 Department: Computer Science Department Head: Michael in Computer Science MS in Computer Science PhD in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment Plan Spring 2007 The Department of Computer Science BS

Maxwell, Bruce D.

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

MSU Departmental Assessment Plan Department: Computer Science  

E-Print Network [OSTI]

MSU Departmental Assessment Plan 2011-2013 Department: Computer Science Department Head: John.S. in Computer Science o Interdisciplinary Option o Professional Option 路 M.S. in Computer Science 路 Ph.D. in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment

Maxwell, Bruce D.

462

MSU Departmental Assessment Plan Department: Computer Science  

E-Print Network [OSTI]

MSU Departmental Assessment Plan 2009-2011 Department: Computer Science Department Head: John Science o Interdisciplinary Option o Professional Option M.S. in Computer Science Ph.D. in Computer Science #12;Department of Computer Science Montana State University Student Outcomes Assessment Plan

Dyer, Bill

463

Offshore Wind Power Farm Environmental Impact Assessment  

E-Print Network [OSTI]

Horns Rev Offshore Wind Power Farm Environmental Impact Assessment on Water Quality #12;Prepared with a planned 150 MW offshore wind farm at Horns Rev, an assessment was made of the effects the wind farm would for the preparation of EIA studies for offshore wind farms." Horns Rev is situated off Bl氓vands Huk, which is Denmark

464

Offshore wind resource assessment through satellite images  

E-Print Network [OSTI]

1 Slide no. 4 Offshore wind resource assessment through satellite images Charlotte Bay Hasager images for offshore wind ressource assessment in lieu of in-situ mast observations #12;4 Slide no Hasager, Dellwik, Nielsen and Furevik, 2004, Validation of ERS-2 SAR offshore wind-speed maps in the North

465

A Global Assessment of Manufacturing: Economic  

E-Print Network [OSTI]

A Global Assessment of Manufacturing: Economic Development, Energy Use, Carbon Emissions Keywords production, materials, closed loop, China, emerging economies Abstract We present in two parts an assessment of global manufacturing. In the first part, we review economic development, pollution, and carbon

Gutowski, Timothy

466

An Assessment of Tropospheric Ozone Pollution  

E-Print Network [OSTI]

An Assessment of Tropospheric Ozone Pollution --A North American Perspective-- Surface Urban, California 94304 #12;AN ASSESSMENT OF TROPOSPHERIC OZONE POLLUTION: A NORTH AMERICAN PERSPECTIVE The NARSTO, Instituto Mexicano del Petroleo, Mexico, D.F., Mexico Alan Dunker, General Motors Research & Development

467

Conservation Assessment for Bloodroot in the Black  

E-Print Network [OSTI]

Conservation Assessment for Bloodroot in the Black Hills National Forest, South Dakota and Wyoming Forest Service Rocky Mountain Region Black Hills National Forest Custer, South Dakota April 2003 #12;Species Assessment of Bloodroot in the Black Hills National Forest, South Dakota and Wyoming J. Hope

468

Conservation Assessment for the Autumn Willow in  

E-Print Network [OSTI]

Conservation Assessment for the Autumn Willow in the Black Hills National Forest, South Dakota Forest Service Rocky Mountain Region Black Hills National Forest Custer, South Dakota April 2003 #12;Species Assessment of Autumn willow in the Black Hills National Forest, South Dakota and Wyoming J. Hope

469

Economic Assessment of the NIST Thermocouple Calibration  

E-Print Network [OSTI]

97-1 Planning Report Economic Assessment of the NIST Thermocouple Calibration Program U of Standards and Technology #12;ECONOMIC ASSESSMENT OF THE NIST THERMOCOUPLE CALIBRATION PROGRAM July 11, 1997.................................................................................. 21 4. EVALUATION FRAMEWORK AND APPROACH........................................... 24 4.1 Scope

470

Missouri Industrial Assessment Center College of Engineering  

E-Print Network [OSTI]

, education, outreach and industrial energy audit. The audit is completely free, with summary recommendationMissouri Industrial Assessment Center College of Engineering University of Missouri-Columbia #12;Mo Department of Energy's requirement, the ultimate goal of Missouri Industrial Assessment Center is to be "the

Noble, James S.

471

SEISMIC VULNERABILITY ASSESSMENT USING AMBIENT VIBRATIONS  

E-Print Network [OSTI]

SEISMIC VULNERABILITY ASSESSMENT USING AMBIENT VIBRATIONS: METHOD AND VALIDATION Clotaire Michel, France cmichel@obs.ujf-grenoble.fr Abstract Seismic vulnerability in wide areas is usually assessed like USA or Italy. France is a country with moderate seismicity so that it requires lower-cost methods

Paris-Sud XI, Universit茅 de

472

Agile Software Assessment (Invited Paper) Oscar Nierstrasz  

E-Print Network [OSTI]

Agile Software Assessment (Invited Paper) Oscar Nierstrasz Software Composition Group University in software development, but it is poorly supported by common development environments, which focus mainly on low-level pro- gramming tasks. We posit the need for agile software assessment, which aims to support

Nierstrasz, Oscar

473

1998 FFTF annual system assessment reports  

SciTech Connect (OSTI)

The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.

Guttenberg, S.

1998-03-19T23:59:59.000Z

474

CARD No. 32 Scope of Performance Assessments  

E-Print Network [OSTI]

that the Waste Isolation Pilot Plant (WIPP) will meet EPA's release limits is conducted through the useCARD No. 32 Scope of Performance Assessments 32.A.1 BACKGROUND The radioactive waste disposal of a process known as a "performance assessment" (PA). The WIPP PA essentially consists of a series of computer

475

Oregon Climate Assessment Report December 2010  

E-Print Network [OSTI]

- Climate change and agriculture in Oregon"" " " " " 151 Chapter 5 - The potential effects of climate changeOregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute #12;Oregon Climate Assessment Report December 2010 Oregon Climate Change Research Institute Recommended citation

Pierce, Stephen

476

STOCK ASSESSMENT OF THE BLUE CRAB  

E-Print Network [OSTI]

STOCK ASSESSMENT OF THE BLUE CRAB IN CHESAPEAKE BAY 2011 #12;2011 Stock assessment for blue crab in Chesapeake Bay iii Executive Summary The blue crab (Callinectes sapidus) is an icon for the Chesapeake Bay region. The commercial fisheries for blue crab in the Bay remain one of the most valuable fishery sectors

477

Total Petroleum Systems and Assessment Units (AU)  

E-Print Network [OSTI]

Total Petroleum Systems (TPS) and Assessment Units (AU) Field type Surface water Groundwater X X X X X X X X AU 00000003 Oil/ Gas X X X X X X X X Total X X X X X X X Total Petroleum Systems (TPS) and Assessment Units (AU) Field type Total undiscovered petroleum (MMBO or BCFG) Water per oil

Torgersen, Christian

478

1Assessment of Urban and Regional Research in the Netherlands, 2000-2006 Assessment of Urban  

E-Print Network [OSTI]

1Assessment of Urban and Regional Research in the Netherlands, 2000-2006 Assessment of Urban and Regional Research in the Netherlands, 2000-2006 January 2008 #12;2 Assessment of Urban and Regional Research in the Netherlands, 2000-2006 Committee Prof. Robson (chair) Prof. Albrechts Prof. Bailey Prof

Utrecht, Universiteit

479

STARS Training Needs Assessment Learner Instructions 07/2009 1 STARS Training Needs Assessment  

E-Print Network [OSTI]

STARS Training Needs Assessment Learner Instructions 07/2009 1 STARS Training Needs Assessment. 路 Click the STARS (Training) tab. 路 Click My Training Needs in the left menu. 路 Click the secure link to continue to My Training Needs. On the Training Needs Assessment page, click the box to the left of every

Ford, James

480

Russian risk assessment methods and approaches  

SciTech Connect (OSTI)

One of the benefits resulting from the collapse of the Soviet Union is the increased dialogue currently taking place between American and Russian nuclear weapons scientists in various technical arenas. One of these arenas currently being investigated involves collaborative studies which illustrate how risk assessment is perceived and utilized in the Former Soviet Union (FSU). The collaborative studies indicate that, while similarities exist with respect to some methodologies, the assumptions and approaches in performing risk assessments were, and still are, somewhat different in the FSU as opposed to that in the US. The purpose of this paper is to highlight the present knowledge of risk assessment methodologies and philosophies within the two largest nuclear weapons laboratories of the Former Soviet Union, Arzamas-16 and Chelyabinsk-70. Furthermore, This paper will address the relative progress of new risk assessment methodologies, such as Fuzzy Logic, within the framework of current risk assessment methods at these two institutes.

Dvorack, M.A.; Carlson, D.D.; Smith, R.E.

1996-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Facility Interface Capability Assessment (FICA) summary report  

SciTech Connect (OSTI)

The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from the commercial facilities. In support of the development of the CRWMS, OCRWM sponsored the Facility Interface Capability Assessment (FICA) project. The objective of this project was to assess the capability of each commercial facility to handle various spent nuclear fuel shipping casks. The purpose of this report is to summarize the results of the facility assessments completed within the FICA project. The project was conducted in two phases. During Phase I, the data items required to complete the facility assessments were identified and the data base for the project was created. During Phase II, visits were made to 122 facilities on 76 sites to collect data and information, the data base was updated, and assessments of the cask-handling capabilities at each facility were performed.

Viebrock, J.M.; Mote, N. [Nuclear Assurance Corp., Norcross, GA (United States); Pope, R.B. [ed.] [Oak Ridge National Lab., TN (United States)

1992-05-01T23:59:59.000Z

482

Tiger Team Assessment of the Ames Laboratory  

SciTech Connect (OSTI)

This report documents the Tiger Assessment of the Ames Laboratory (Ames), located in Ames, Iowa. Ames is operated for the US Department of Energy (DOE) by Iowa State University. The assessment was conducted from February 10 to March 5, 1992, under the auspices of the Office of Special Projects, Office of the Assistant Secretary of Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing Environment, Safety, and Health (ES H) disciplines; management practices; and contractor and DOE self-assessments. Compliance with applicable Federal, State of Iowa, and local regulations; applicable DOE Orders; best management practices; and internal requirements at Ames Laboratory were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and the site contractor's management of ES H/quality assurance program was conducted.

Not Available

1992-03-01T23:59:59.000Z

483

Preliminary design study of compressed-air energy storage in a salt dome. Volume 7. Environmental and safety assessment. Final report  

SciTech Connect (OSTI)

The construction of a 220 MWe CAES facility by the Middle South Utilities is proposed. The plant consists of two subsurface air storage, coupled to a surface peak-load electric generating station to provide a more efficient utilization of installed base-load generating capacity. The caverns are solutioned-mined in the Carmichael Salt Dome. An investigation was made to assess the environmental feasibility and consequences of the construction and operation of a Compressed Air Energy Storage (CAES) facility for the Middle South Service System. A site evaluation effort was made for 47 sites. The results of these investigations led to the choice of the Carmichael site as the preferred location. The proposed plant will be located in a rural portion of central Mississippi near Carmichael, about 25 miles south of Jackson. The site and transmission facilities will occupy less than 25 acres. The judgment in selecting the preferred transmission line routing and facilities was in minimizing environmental impacts. Environmental information pertaining to several disciplines was accumulated by direct contact with State and Federal agency representatives, Mississippi Natural Heritage Program personnel and experts from the nearby site under consideration. Following the gathering of pertinent data from knowledgeable sources, an intensive one week site survey was conducted by senior environmental scientists and engineers. Based upon the available engineering data and field evidence used in preparing this Environmental Assessment, the conclusion reached is that a full length Environmental Impact Statement should be prepared prior to the construction and operation of the proposed facility, the rationale being: (1) the technologies associated with CAES the facility, and (2) this facility will probably be the first of its kind in the US, and therefore will be closely scrutinized for ts potential impacts.

Not Available

1982-04-01T23:59:59.000Z

484

Nuclear Nonproliferation Ontology Assessment Team Final Report  

SciTech Connect (OSTI)

Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

Strasburg, Jana D.; Hohimer, Ryan E.

2012-01-01T23:59:59.000Z

485

River Protection Project information systems assessment  

SciTech Connect (OSTI)

The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

JOHNSON, A.L.

1999-07-28T23:59:59.000Z

486

Impact assessment: Eroding benefits through streamlining?  

SciTech Connect (OSTI)

This paper argues that Governments have sought to streamline impact assessment in recent years (defined as the last five years) to counter concerns over the costs and potential for delays to economic development. We hypothesise that this has had some adverse consequences on the benefits that subsequently accrue from the assessments. This hypothesis is tested using a framework developed from arguments for the benefits brought by Environmental Impact Assessment made in 1982 in the face of the UK Government opposition to its implementation in a time of economic recession. The particular benefits investigated are 慶onsistency and fairness, 慹arly warning, 慹nvironment and development, and 憄ublic involvement. Canada, South Africa, the United Kingdom and Western Australia are the jurisdictions tested using this framework. The conclusions indicate that significant streamlining has been undertaken which has had direct adverse effects on some of the benefits that impact assessment should deliver, particularly in Canada and the UK. The research has not examined whether streamlining has had implications for the effectiveness of impact assessment, but the causal link between streamlining and benefits does sound warning bells that merit further investigation. -- Highlights: Investigation of the extent to which government has streamlined IA. Evaluation framework was developed based on benefits of impact assessment. Canada, South Africa, the United Kingdom, and Western Australia were examined. Trajectory in last five years is attrition of benefits of impact assessment.

Bond, Alan, E-mail: alan.bond@uea.ac.uk [School of Environmental Sciences, University of East Anglia (United Kingdom) [School of Environmental Sciences, University of East Anglia (United Kingdom); School of Geo and Spatial Sciences, North-West University (South Africa); Pope, Jenny, E-mail: jenny@integral-sustainability.net [Integral Sustainability (Australia) [Integral Sustainability (Australia); Curtin University Sustainability Policy Institute (Australia); Morrison-Saunders, Angus, E-mail: A.Morrison-Saunders@murdoch.edu.au [School of Geo and Spatial Sciences, North-West University (South Africa) [School of Geo and Spatial Sciences, North-West University (South Africa); Environmental Science, Murdoch University (Australia); Retief, Francois, E-mail: francois.retief@nwu.ac.za [School of Geo and Spatial Sciences, North-West University (South Africa)] [School of Geo and Spatial Sciences, North-West University (South Africa); Gunn, Jill A.E., E-mail: jill.gunn@usask.ca [Department of Geography and Planning and School of Environment and Sustainability, University of Saskatchewan (Canada)

2014-02-15T23:59:59.000Z

487

Small Modular Reactors: Institutional Assessment  

SciTech Connect (OSTI)

? Objectives include, among others, a description of the basic development status of 搒mall modular reactors (SMRs) focused primarily on domestic activity; investigation of the domestic market appeal of modular reactors from the viewpoints of both key energy sector customers and also key stakeholders in the financial community; and consideration of how to proceed further with a pro-active "core group" of stakeholders substantially interested in modular nuclear deployment in order to provide the basis to expedite design/construction activity and regulatory approval. ? Information gathering was via available resources, both published and personal communications with key individual stakeholders; published information is limited to that already in public domain (no confidentiality); viewpoints from interviews are incorporated within. Discussions at both government-hosted and private-hosted SMR meetings are reflected herein. INL itself maintains a neutral view on all issues described. Note: as per prior discussion between INL and CAP, individual and highly knowledgeable senior-level stakeholders provided the bulk of insights herein, and the results of those interviews are the main source of the observations of this report. ? Attachment A is the list of individual stakeholders consulted to date, including some who provided significant earlier assessments of SMR institutional feasibility. ? Attachments B, C, and D are included to provide substantial context on the international status of SMR development; they are not intended to be comprehensive and are individualized due to the separate nature of the source materials. Attachment E is a summary of the DOE requirements for winning teams regarding the current SMR solicitation. Attachment F deserves separate consideration due to the relative maturity of the SMART SMR program underway in Korea. Attachment G provides illustrative SMR design features and is intended for background. Attachment H is included for overview purposes and is a sampling of advanced SMR concepts, which will be considered as part of the current DOE SMR program but whose estimated deployment time is beyond CAP抯 current investment time horizon. Attachment I is the public DOE statement describing the present approach of their SMR Program.

Joseph Perkowski, Ph.D.

2012-06-01T23:59:59.000Z

488

Marginal Lands: Concept, Assessment and Management  

SciTech Connect (OSTI)

Marginal lands have received wide attention for their potential to improve food security and support bioenergy production. However, environmental, ecosystem service, and sustainability concerns have been widely raised over the use of marginal land. Knowledge of the extent, location, and quality of marginal lands as well as their assessment and management are limited and diverse. This paper provides a review of the historical development of marginal concept, its application and assessment. Limitations and priority research needs of marginal land assessment and management were discussed.

Kang, Shujiang [ORNL; Post, Wilfred M [ORNL; West, Tristram O. [Joint Global Change Research Institute, PNNL; Bandaru, Vara Prasad [ORNL; Izaurralde, Dr. R. Cesar [Pacific Northwest National Laboratory (PNNL); Wang, Dali [ORNL; Nichols, Dr Jeff A [ORNL

2013-01-01T23:59:59.000Z

489

283-E and 283-W hazards assessment  

SciTech Connect (OSTI)

This report documents the hazards assessment for the 200 area water treatment plants 283-E and 283-W located on the US DOE Hanford Site. Operation of the water treatment plants is the responsibility of ICF Kaiser Hanford Company (ICF KH). This hazards assessment was conducted to provide emergency planning technical basis for the water treatment plants. This document represents an acceptable interpretation of the implementing guidance document for DOE ORDER 5500.3A which requires an emergency planning hazards assessment for each facility that has the potential to reach or exceed the lowest level emergency classification.

Sutton, L.N.

1994-09-26T23:59:59.000Z

490

Performance Assessment for Environmental Decision Making  

SciTech Connect (OSTI)

The Waste Isolation Pilot Plant (WIPP) Performance Assessment Departments at Sandia National Laboratories have, over the last twenty (20) years, developed unique, internationally-recognized performance and risk assessment methods to assess options for the safe disposal and remediation of radioactive and non-radioactive hazardous waste/contamination in geohydrologic systems. While these methods were originally developed for the disposal of nuclear waste, ongoing improvements and extensions make them equally applicable to a variety of environmental problems such as those associated with the remediation of EPA designated Superfund sites and the more generic Brownfield sites (industrial sites whose future use is restricted because of real or perceived contamination).

Anderson, D.R.; Fewell, M.E.; Gomez, L.S.; Marietta, M.G.; Swift, P.N.; Trauth, K.M.; Vaughn, P. [Sandia National Labs., Albuquerque, NM (United States); MacKinnon, R.J. [Applied Physics, Inc., Albuquerque, NM (United States)

1997-12-01T23:59:59.000Z

491

THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS  

SciTech Connect (OSTI)

This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1,100 ft above the basal sandstone and is 100-200 ft thick. The storage capacity estimates for a 20-mile radius from the injection well ranged from 39-78 million tons (Mt) for each formation. Several other oil and gas plays have hydraulic properties conducive for injection, but the formations are generally only 5-50 ft thick in the study area. Overlying the injection reservoirs are thick sequences of dense, impermeable dolomite, limestone, and shale. These layers provide containment above the potential injection reservoirs. In general, it appears that the containment layers are much thicker and extensive than the injection intervals. Other physical parameters for the study area appear to be typical for the region. Anticipated pressures at maximum depths are approximately 4,100 psi based on a 0.45 psi/ft pressure gradient. Temperatures are likely to be 150 F. Groundwater flow is slow and complex in deep formations. Regional flow directions appear to be toward the west-northwest at less than 1 ft per year within the basal sandstone. Vertical gradients are downward in the study area. A review of brine geochemistry indicates that formation fluids have high salinity and dissolved solids. Total dissolved solids ranges from 200,000-325,000 mg/L in the deep reservoirs. Brine chemistry is similar throughout the different formations, suggesting extensive mixing in a mature basin. Unconsolidated sediments in the Ohio River Valley are the primary source of drinking water in the study area.

Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

2003-08-01T23:59:59.000Z

492

Post-Retrofit Residential Assessments  

SciTech Connect (OSTI)

This study examined a range of factors influencing energy consumption in households that had participated in residential energy-efficiency upgrades. The study was funded by a grant from the U.S. Department of Energy抯 Pacific Northwest National Laboratory and was conducted by faculty and staff of Portland State University Center for Urban Studies and Department of Economics. This work was made possible through the assistance and support of the Energy Trust of Oregon (ETO), whose residential energy-efficiency programs provided the population from which the sample cases were drawn. All households in the study had participated in the ETO Home Performance with Energy Star (HPwES) program. A number of these had concurrently pursued measures through other ETO programs. Post-retrofit energy outcomes are rarely investigated on a house-by-house basis. Rather, aggregate changes are ordinarily the focus of program impact evaluations, with deviation from aggregate expectations chalked up to measurement error, the vagaries of weather and idiosyncrasies of occupants. However, understanding how homes perform post-retrofit on an individual basis can give important insights to increase energy savings at the participant and the programmatic level. Taking a more disaggregated approach, this study analyzed energy consumption data from before and after the retrofit activity and made comparisons with engineering estimates for the upgrades, to identify households that performed differently from what may have been expected based on the estimates. A statistical analysis using hierarchal linear models, which accounted for weather variations, was performed looking separately at gas and electrical use during the periods before and after upgrades took place. A more straightforward comparison of billing data for 12-month periods before and after the intervention was also performed, yielding the majority of the cases examined. The later approach allowed total energy use and costs to be assessed but did not account for weather variation. From this statistical analysis, 18 study participants were selected and interviewed. The participants completed an in-home interview covering a range of topics, including changes in occupancy and additional changes to the homes that may have affected energy use. The goal of the interviews was to identify factors that may have contributed to unusual energy performance. These factors were identified by their frequency of occurrence in outperforming or underperforming homes, or simply by identifying factors that had the largest impact on overall savings. The motivations and levels of satisfaction with the outcomes of the upgrades were covered in detail, as well as extensive discussions of behaviors pertaining to thermal control, lighting, water, and appliance use. Most of cases studied achieved substantial energy savings, although it was more common for the projected savings to be greater than the demonstrated savings. Two factors that played a very large role in savings variation were 1) changes in occupancy and 2) fenestration improvements outside of the incentive programs. Motivation for pursuing the upgrades (e.g., environmental sustainability vs. comfort or cost savings) did not seem to play any role in achieving savings. Participants generally were more concerned with maintaining aesthetics through lighting than comfort through heating or cooling. They also seemed more likely to turn the lights off when leaving a room than to turn the heat off when leaving the home.

Lancaster, Ross; lutzenhiser, Loren; Moezzi, Mithra; Widder, Sarah H.; Chandra, Subrato; Baechler, Michael C.

2012-04-30T23:59:59.000Z

493

Gap Assessment (FY 13 Update)  

SciTech Connect (OSTI)

To help guide its future data collection efforts, The DOE GTO funded a data gap analysis in FY2012 to identify high potential hydrothermal areas where critical data are needed. This analysis was updated in FY2013 and the resulting datasets are represented by this metadata. The original process was published in FY 2012 and is available here: https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2013/Esposito.pdf Though there are many types of data that can be used for hydrothermal exploration, five types of exploration data were targeted for this analysis. These data types were selected for their regional reconnaissance potential, and include many of the primary exploration techniques currently used by the geothermal industry. The data types include: 1. well data 2. geologic maps 3. fault maps 4. geochemistry data 5. geophysical data To determine data coverage, metadata for exploration data (including data type, data status, and coverage information) were collected and catalogued from nodes on the National Geothermal Data System (NGDS). It is the intention of this analysis that the data be updated from this source in a semi-automated fashion as new datasets are added to the NGDS nodes. In addition to this upload, an online tool was developed to allow all geothermal data providers to access this assessment and to directly add metadata themselves and view the results of the analysis via maps of data coverage in Geothermal Prospector (http://maps.nrel.gov/gt_prospector). A grid of the contiguous U.S. was created with 88,000 10-km by 10-km grid cells, and each cell was populated with the status of data availability corresponding to the five data types. Using these five data coverage maps and the USGS Resource Potential Map, sites were identified for future data collection efforts. These sites signify both that the USGS has indicated high favorability of occurrence of geothermal resources and that data gaps exist. The uploaded data are contained in two data files for each data category. The first file contains the grid and is in the SHP file format (shape file.) Each populated grid cell represents a 10k area within which data is known to exist. The second file is a CSV (comma separated value) file that contains all of the individual layers that intersected with the grid. This CSV can be joined with the map to retrieve a list of datasets that are available at any given site. The attributes in the CSV include: 1. grid_id : The id of the grid cell that the data intersects with 2. title: This represents the name of the WFS service that intersected with this grid cell 3. abstract: This represents the description of the WFS service that intersected with this grid cell 4. gap_type: This represents the category of data availability that these data fall within. As the current processing is pulling data from NGDS, this category universally represents data that are available in the NGDS and are ready for acquisition for analytic purposes. 5. proprietary_type: Whether the data are considered proprietary 6. service_type: The type of service 7. base_url: The service URL

Getman, Dan

2013-09-30T23:59:59.000Z

494

ENVIRONMENTAL ASSESSMENT WASTE WATER TREATMENT MODIFICATIONS  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT FOR WASTE WATER TREATMENT MODIFICATIONS FOR IMPROVED EFFLUENT COMPLIANCE................................................38 5.3.4 Effects of the Enhanced Treatment Alternative on Water Resources........................39 5.................................................................................................. 21 4.3 Alternative 3 颅 Enhanced Effluent Treatment

Ohta, Shigemi

495

Seismic assessment strategies for masonry structures  

E-Print Network [OSTI]

Masonry structures are vulnerable to earthquakes, but their seismic assessment remains a challenge. This dissertation develops and improves several strategies to better understand the behavior of masonry structures under ...

DeJong, Matthew J. (Matthew Justin)

2009-01-01T23:59:59.000Z

496

Structural analysis and assessment of Guastavino vaulting  

E-Print Network [OSTI]

This thesis studies the behavior and pathologies of the masonry tile structures built by the R. Guastavino Company in order to provide recommendations on their analysis and assessment. Structural analyses of two specific ...

Reese, Megan L

2008-01-01T23:59:59.000Z

497

Transportation risk assessment for ethanol transport  

E-Print Network [OSTI]

(California, Texas Gulf Coast, New England Atlantic Coast) will be of particular interest. The goal is to conduct a quantitative risk assessment on the pipeline, truck, and rail transportation modes to these areas. As a result of the quantitative risk...

Shelton Davis, Anecia Delaine

2009-05-15T23:59:59.000Z

498

Assessment of rainwater harvesting in Northern Ghana  

E-Print Network [OSTI]

This study assesses the current state of rainwater harvesting in the Northern Region of Ghana and makes recommendations regarding if and how rainwater harvesting could be used to address Pure Home Water's goal of reaching ...

Barnes, David Allen

2009-01-01T23:59:59.000Z

499

Assessing reliability in energy supply systems  

E-Print Network [OSTI]

R.N. , 1984. Power-system reliability in perspective, in:L. (Eds. ), 1991. Applied Reliability Assessment in ElectricR. , Allan, R.N. , 1996. Reliability Evaluation of Power

McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

2007-01-01T23:59:59.000Z

500

Assessing Reliability in Energy Supply Systems  

E-Print Network [OSTI]

R.N. , 1984. Power-system reliability in perspective, in:L. (Eds. ), 1991. Applied Reliability Assessment in ElectricR. , Allan, R.N. , 1996. Reliability Evaluation of Power

McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

2008-01-01T23:59:59.000Z