Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

2

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

3

EA-1456: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

4

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming...

5

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 10380 of 28,905 results. 71 - 10380 of 28,905 results. Download Track A - Energy Systems Innovations Presentations from Track A, Energy Systems Innovations, of the U.S. Department of Energy Building America program's 2012 Residential Energy Efficiency Stakeholder Meeting are provided below as Adobe Acrobat PDFs. These presentations for this track covered the following topics: Space Conditioning and Hot Water Systems; Options for Insulating Foundations; Mini-split Systems; Heat Pump Water Heaters; Hydronic Heating Control Strategies; and Exterior Insulation Breakthroughs. http://energy.gov/eere/downloads/track-energy-systems-innovations Download EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado http://energy.gov/nepa/downloads/ea-1456-final-environmental-assessment

6

Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47 47 Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico November 3, 2003 Department of Energy National Nuclear Security Administration Los Alamos Site Office Environmental Assessment for the Proposed DX Division Strategic Facility Plan at LANL DOE LASO November 3, 2003 iii Contents Acronyms and Terms................................................................................................................................vii Executive Summary ...................................................................................................................................xi 1.0 Purpose and Need

7

EA-1456: Finding of No Signficant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Finding of No Signficant Impact 6: Finding of No Signficant Impact EA-1456: Finding of No Signficant Impact Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmisison line which crosses Carbon, Albany and Laramie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Larmie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-kV H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Finding of No Signficant Impact Cheyenne-Miracle Mile and Ault-Cheyanne

8

Three Mile Island-1, Crystal River-3, and Davis-Besse Fuel Crud Observations Assessment and Root Cause  

Science Conference Proceedings (OSTI)

This report shares information pertaining to elevated crud observed on fuel at Babcock Wilcox (BW) plants Crystal River-3, Davis-Besse, and Three Mile Island-1 and the subsequent causal investigation performed by AREVA, Inc. Discussion of industry operating experience, effects of crud, fuel inspection results, and preventive and corrective actions in future operating cycles are also included.

2011-10-26T23:59:59.000Z

9

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2006 31, 2006 New Facility Will Test Disposal Cell Cover Renovation New Facility Will Test Disposal Cell Cover Renovation November 20, 2006 EA-1456: Finding of No Signficant Impact Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado September 1, 2006 EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado November 16, 2005 EA-1508: Finding of No Significant Impact Beaver Creek-Hoyt-Erie 115-kV Transmission Line Upgrade, Morgan and Weld Counties, Colorado November 1, 2005 EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld

10

Assessment of extent and degree of thermal damage to polymeric materials in the Three Mile Island Unit 2 Reactor building  

DOE Green Energy (OSTI)

This paper describes assumptions and procedures used to perform thermal damage analysis caused by post loss-of-coolant-accident (LOCA) hydrogen deflagration at Three Mile Island Unit 2 Reactor. Examination of available photographic evidence yields data on the extent and range of thermal and burn damage. Thermal damage to susceptible material in accessible regions of the reactor building was distributed in non-uniform patterns. No clear explanation for non-uniformity was found in examined evidence, e.g., burned materials were adjacent to materials that appear similar but were not burned. Because these items were in proximity to vertical openings that extend the height of the reactor building, we assume the unburned materials preferentially absorbed water vapor during periods of high, local steam concentration. A control pendant from the polar crane located in the top of the reactor building sustained asymmetric burn damage of decreasing degree from top to bottom. Evidence suggests the polar-crane pendant side that experienced heaviest damage was exposed to intense radiant energy from a transient fire plume in the reactor containment volume. Simple hydrogen-fire-exposure tests and heat transfer calculations approximate the degree of damage found on inspected materials from the containment building and support for an estimated 8% pre-fire hydrogen.

Alvares, N.J.

1985-06-01T23:59:59.000Z

11

Miles Hand Grenade  

DOE Patents (OSTI)

A simulated grenade for MILES-type simulations generates a unique RF signal and a unique audio signal. A detector utilizes the time between receipt of the RF signal and the slower-traveling audio signal to determine the distance between the detector and the simulated grenade.

Harrington, John J. (Albuquerque, NM); Buttz, James H. (Albuquerque, NM); Maish, Alex B. (Corrales, NM); Page, Ray R. (Albuquerque, NM); Metcalf, Herbert E. (Albuquerque, NM)

2005-11-15T23:59:59.000Z

12

Three Mile Island  

SciTech Connect

The Three Mile Island accident was the worst accident ever experienced by the nuclear power industry. Although the radiation exposures were extremely low, the potential for greater public exposure did exist. Fortunately, the health and safety of the public were not affected by radiation, nor was anyone killed or injured; however, thousand of lives were disrupted by fear and anxiety and by a limited evacuation. The events and actions contributing to the accident are described.

Buhl, A.R.

1980-09-01T23:59:59.000Z

13

miles-99.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

Vertical Velocity Statistics as Derived from 94-GHz Vertical Velocity Statistics as Derived from 94-GHz Radar Measurements N. L. Miles, D. M. Babb, and J. Verlinde The Pennsylvania State University University Park, Pennsylvania Introduction Profiles of millimeter-wavelength radar Doppler spectra contain information about both the mean vertical velocities and cloud microphysics. In order to obtain this information, it is necessary to remove the effects of turbulence. Stratocumulus clouds often contain various species of ice and liquid, including graupel, crystals, columns, plates, liquid droplets, and drizzle drops. Most of the previous work to remotely determine microphysics of stratus clouds has largely ignored the presence of drizzle and ice, restricting applicability to only liquid clouds with no drizzle, a relatively rare event. Since mixed phase

14

Miles Electric Vehicles | Open Energy Information  

Open Energy Info (EERE)

Miles Electric Vehicles Jump to: navigation, search Name Miles Electric Vehicles Place Santa Monica, California Zip 90405 Sector Vehicles Product California-based developer of...

15

square-mile Black Warrior Basin  

NLE Websites -- All DOE Office Websites (Extended Search)

will inject CO will inject CO 2 into a coalbed methane (CBM) well in Tuscaloosa County, Alabama, to assess the capability of mature CBM reservoirs to receive and adsorb large volumes of CO 2 . Injection began at the test site on June 15; the site was selected because it is representative of the 23,000- square-mile Black Warrior Basin located in northwestern Alabama and northeastern Mississippi. It is estimated that this area has the potential to store in the range of 1.1 to 2.3 Gigatons of CO 2 , which is approximately the amount that Alabama's coal-fired power plants emit in two decades. The targeted coal seams range from 940 to 1,800 feet deep and are one to six feet thick. Approximately 240 tons of CO 2 will be injected over a 45- to 60-day period. More information

16

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA) Indexed Site

Three Mile Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

17

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

18

Chapter 3. Vehicle-Miles Traveled  

U.S. Energy Information Administration (EIA) Indexed Site

3. Vehicle-Miles Traveled 3. Vehicle-Miles Traveled Chapter 3. Vehicle-Miles Traveled Vehicle-miles traveled--the number of miles that residential vehicles are driven--is probably the most important information collected by the Residential Transportation Energy Consumption Survey. Using the data on vehicle-miles traveled allows analysts to answer such questions as: "Are minivans driven more than passenger cars?" "Do people in the West drive more than people elsewhere?" "Do people conserve their new cars by driving them less?" "Who drives more--people in households with children, or other people?" "At what ages do people drive the most?" "How does growing income affect the amount of driving?" In addition to answering those kinds of questions, analysts also use the number of vehicle-miles traveled to compute estimated, on-road vehicle fuel consumption, economy, and expenditures, all of which have important implications for U.S. energy policy and national security (see Chapter 4).

19

Three Mile Canyon | Open Energy Information  

Open Energy Info (EERE)

Mile Canyon Mile Canyon Jump to: navigation, search Name Three Mile Canyon Facility Three Mile Canyon Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner John Deere Wind Developer Momentum RE Energy Purchaser PacifiCorp Location Morrow County OR Coordinates 45.717419°, -119.502258° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.717419,"lon":-119.502258,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

20

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA)

snpt3pa8011 805 6,634 94.1 PWR Three Mile Island Unit Type Data for 2010 PWR = Pressurized Light Water Reactor. Note: Totals may not equal sum of ...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network (OSTI)

In) Symposium on Nuclear Reactor Safety: Perspective. Ahealth effects of the nuclear reactor accident at Three Mile50-mile radius of the nuclear reactor site, approximately

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

22

1st Mile | Open Energy Information  

Open Energy Info (EERE)

Mile Mile Jump to: navigation, search Name 1st Mile Place Lyngby, Denmark Zip 2800 Product Denmark-based company that provides research and screening for venture capitalists. Website http://www.1stmile.dk/ Coordinates 56.866669°, 8.31667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.866669,"lon":8.31667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

23

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 31540 of 31,917 results. 31 - 31540 of 31,917 results. Download EA-1542: Finding of No Significant Impact Burleigh County Wind Energy Center, North Dakota http://energy.gov/nepa/downloads/ea-1542-finding-no-significant-impact Download EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado http://energy.gov/nepa/downloads/ea-1456-mitigation-action-plan Download EIS-0450: Notice of Intent To Prepare an Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada http://energy.gov/nepa/downloads/eis-0450-notice-intent-prepare-environmental-impact-statement Download PSH-12-0100- In the Matter of Personnel Security Hearing

24

Microsoft Word - Seven Mile CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 7, 2010 October 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum - Seven Mile Project Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Seven Mile Project Budget Information: Work Order 00211600 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.11 "Installation of fencing... that will not adversely affect wildlife of surface water flow." B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." B4.11 "Construction or electric power substations (including switching stations and support facilities) with power delivery at 230-kV or below, or modification (other than voltage increases) of existing

25

square miles | OpenEI Community  

Open Energy Info (EERE)

0 0 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235190 Varnish cache server square miles Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm happy to announce that a new report on Solar+Land+Use was just released by the National+Renewable+Energy+Laboratory. You can find a brief summary of the results at the Solar+Land+Use page on OpenEI.

26

March 28, 1979: Three Mile Island | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1979: Three Mile Island March 28, 1979 A partial meltdown of the core occurs at one of the two reactors at the Three Mile Island nuclear power plant near Harrisburg, Pennsylvania...

27

Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Miles Traveled Vehicle Miles Traveled Tax Feasibility Evaluation to someone by E-mail Share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Facebook Tweet about Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Twitter Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Google Bookmark Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Delicious Rank Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on Digg Find More places to share Alternative Fuels Data Center: Vehicle Miles Traveled Tax Feasibility Evaluation on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

28

Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Oregon Celebrates 200 Oregon Celebrates 200 Miles of Electric Highways to someone by E-mail Share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Facebook Tweet about Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Twitter Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Google Bookmark Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Delicious Rank Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on Digg Find More places to share Alternative Fuels Data Center: Oregon Celebrates 200 Miles of Electric Highways on AddThis.com... April 18, 2012 Oregon Celebrates 200 Miles of Electric Highways " These [electric charging] stations will help create a corridor that, by the

29

Ozark 260-mile gas line system completed  

Science Conference Proceedings (OSTI)

Gathering gas in the Arkoma basin of Oklahoma and Arkansas for transport to market, the 260-mile Ozark gas line system runs from southwest of McAlester, Okla., to Natural Gas Pipeline Co. of America's station at Searcy, Ark. The recently completed mainline has an initial capacity of 170 million CF/day with a maximum operating pressure of 1200 psig and a delivery pressure of 700 psig at the NGPL station. The 20-in. pipeline is API 5LX-Grade X60, 0.281-in. wall thickness for Class 1 areas, 0.344 for Class 2 areas, 0.406 for Class 3 areas, and API 5LX-Grade X52, 0.500-in. wall thickness for river crossings.

Dixon, R.R.

1982-05-01T23:59:59.000Z

30

A GEM Award (Going the Extra Mile)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEM Award GEM Award Going the Extra Mile A Gift Card Recognition Program Who may receive? All Headquarters Department of Energy Employees except Political Appointees (including Schedule C and non-career members of the SES). Any Employee may nominate. What is it? $25 or $50 Gift Cards from 100s Department Stores, Book Stores, Hotels and more. of nationally well known Movie Tickets, Restaurants, How do I do it? * Nominator fills out form. * Routes form through their organizational protocols. * Faxes or scans/emails to HQ Gift Card. * HQ Gift Card receives form, places order * Gift Certificate is sent to Recipient's Supervisor * Supervisor presents certificate to employee * Employee can redeem On-line or by phone for card their choice of When can I do this? HQ Gift Card is open for business now

31

Experiments on hydrogen for Three Mile Island  

DOE Green Energy (OSTI)

Starting on April 1, 1979, Billings Energy Corporation under the direction of EG and G Idaho, Inc., undertook a series of tests for Nuclear Regulatory Commission to provide information regarding (1) potential amount of hydrogen in the primary coolant water in the Three Mile Island 2 Reactor; (2) methods of scavenging gaseous hydrogen from the reactor system; and (3) the determination of the most efficient and also the safest means of depressurization. Although only small amounts of hydrogen were later found in the system, this study produced information of interest for similar accidents in which hydrogen remains in the system. No investigations of radiochemical effects were made; the study focused on non-radiation solubility and chemical effects.

Wooley, R.L.; Ruckman, J.H.; Kimball, G.L.; Ayers, A.L. Jr.; Liebenthal, J.L.

1980-01-01T23:59:59.000Z

32

Salt Wells, Eight Mile Flat | Open Energy Information  

Open Energy Info (EERE)

Salt Wells, Eight Mile Flat Salt Wells, Eight Mile Flat Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Salt Wells, Eight Mile Flat Abstract Abstract unavailable. Author Nevada Bureau of Mines and Geology Published Online Nevada Encyclopedia, 2009 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Salt Wells, Eight Mile Flat Citation Nevada Bureau of Mines and Geology. Salt Wells, Eight Mile Flat [Internet]. 2009. Online Nevada Encyclopedia. [updated 2009/03/24;cited 2013/08/07]. Available from: http://www.onlinenevada.org/articles/salt-wells-eight-mile-flat Related Geothermal Exploration Activities Activities (1) Areas (1) Regions (0) Development Wells At Salt Wells Area (Nevada Bureau of Mines and Geology, 2009) Salt Wells Geothermal Area

33

New York Nuclear Profile - Nine Mile Point Nuclear Station  

U.S. Energy Information Administration (EIA) Indexed Site

Nine Mile Point Nuclear Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

34

Entiat 4Mile WELLs Completion Report, 2006.  

DOE Green Energy (OSTI)

The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

Malinowksi, Richard

2007-01-01T23:59:59.000Z

35

Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reduce Vehicle Miles Traveled Reduce Vehicle Miles Traveled Petroleum Reduction Strategies to Reduce Vehicle Miles Traveled October 7, 2013 - 11:52am Addthis YOU ARE HERE: Step 3 For reducing greenhouse gas emissions, the table below describes petroleum reduction strategies to reduce vehicle miles traveled, as well as guidance and best practices for each strategy. Table 1. Determining When and How to Promote the Use of Strategies to Reduce Vehicle Miles Traveled Strategy When Applicable Best Practices Consolidate trips Applicable to all vehicles, regardless of ownership or vehicle and fuel type Target vehicle operators who take longer trips Seek vehicle operator input and collaboration to identify regular or occasional trips that involve similar routes. Determine whether trips on multiple days or times can be consolidated into a single trip.

36

HEALTH EFFECTS OF THE NUCLEAR ACCIDENT AT THREE MILE ISLAND  

E-Print Network (OSTI)

within 50 miles of the nuclear power plant was estimated tothe radiation from the nuclear power plant accident. From anand the Peach Bottom nuclear power plants, like the general

Fabrikant, J.I.

2010-01-01T23:59:59.000Z

37

Odometer Versus Self-Reported Estimates of Vehicle Miles Traveled  

Reports and Publications (EIA)

The findings described here compare odometer readings with self-reported estimates of Vehicle Miles Traveled (VMT) to investigate to what extent self-reported VMT is a reliable surrogate for odometer-based VMT.

Information Center

2000-08-01T23:59:59.000Z

38

Health effects of the nuclear accident at Three Mile Island  

SciTech Connect

Between March 28 and April 15, 1979 the collective dose resulting from the radioactivity released to the population living within a 50-mile radius of the Three Mile Island nuclear plant was about 2000 person-rems, less than 1% of the annual natural background level. The average dose to a person living within 5 miles of the nuclear plant was less than 10% of annual background radiation. The maximum estimated radiation dose received by any one individual in the general population (excluding the nuclear plant workers) during the accident was 70 mrem. The doses received by the general population as a result of the accident were so small that there will be no detectable additional cases of cancer, developmental abnormalities, or genetic ill-health. Three Three Mile Island nuclear workers received radiation doses of about 3 to 4 rem, exceeding maximum permissible quarterly dose of 3 rem. The major health effect of the accident at Three Mile Island was that of a pronounced demoralizing effect on the general population in the Three Mile Island area, including teenagers and mothers of preschool children and the nuclear plant workers. However, this effect proved transient in all groups studied except the nuclear workers.

Fabrikant, J.I.

1980-05-01T23:59:59.000Z

39

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Seven Mile Hole Geothermal Area (Redirected from Seven Mile Hole Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase:

40

Seven Mile Hole Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Seven Mile Hole Geothermal Area Seven Mile Hole Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Seven Mile Hole Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (4) 10 References Area Overview Geothermal Area Profile Location: Wyoming Exploration Region: Yellowstone Caldera Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles  

NLE Websites -- All DOE Office Websites (Extended Search)

9: April 25, 9: April 25, 2005 Medium-Truck Miles by Age to someone by E-mail Share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Facebook Tweet about Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Twitter Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Google Bookmark Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Delicious Rank Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on Digg Find More places to share Vehicle Technologies Office: Fact #369: April 25, 2005 Medium-Truck Miles by Age on AddThis.com... Fact #369: April 25, 2005 Medium-Truck Miles by Age Medium trucks (class 3-6) were driven an average of 14,439 miles in 2002.

42

MHK Projects/Fortyeight Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Fortyeight Mile Point Project Fortyeight Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0447,"lon":-90.6659,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

43

one mile underground into a deep saline formation. The injection  

NLE Websites -- All DOE Office Websites (Extended Search)

mile underground into a deep saline formation. The injection, mile underground into a deep saline formation. The injection, which will occur over a three-year period and is slated to start in early 2010, will compress up to 1 million metric tonnes of CO 2 from the ADM ethanol facility into a liquid-like, dense phase. The targeted rock formation, the Mt. Simon Sandstone, is the thickest and most widespread saline reservoir in the Illinois Basin, with an estimated CO 2 storage capacity of 27 to 109 billion metric tonnes. A comprehensive monitoring program, which will be evaluated yearly, will be implemented after the injection to ensure the injected CO 2 is stored safely and permanently. The RCSP Program was launched by the Office of Fossil Energy (FE)

44

MHK Projects/Twelve Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Twelve Mile Point Project Twelve Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.9177,"lon":-89.9307,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

45

Seven Mile, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Mile, Ohio: Energy Resources Mile, Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.480056°, -84.5518916° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.480056,"lon":-84.5518916,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

46

Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per  

NLE Websites -- All DOE Office Websites (Extended Search)

3: June 11, 2007 3: June 11, 2007 Vehicle-Miles per Licensed Driver to someone by E-mail Share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Facebook Tweet about Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Twitter Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Google Bookmark Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Delicious Rank Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on Digg Find More places to share Vehicle Technologies Office: Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver on AddThis.com... Fact #473: June 11, 2007 Vehicle-Miles per Licensed Driver

47

Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 (thousand miles) History Reference case 1970.00 $8.69 1971.00 $9.01

48

894 AP880212-0103 -1 ville is 60 miles east of Aspen , 40 ...  

Science Conference Proceedings (OSTI)

894 AP880212-0103 -1 ville is 60 miles east of Aspen , 40 miles south o 894 AP880328-0088 -1 all overnight , while 6 inches was reported at Asp ...

2002-04-29T23:59:59.000Z

49

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

SciTech Connect

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-01-01T23:59:59.000Z

50

Vegetation survey of Pen Branch and Four Mile Creek wetlands  

Science Conference Proceedings (OSTI)

One hundred-fifty plots were recently sampled (vegetational sampling study) at the Savannah River Site (SRS). An extensive characterization of the vascular flora, in four predetermined strata (overstory, Understory, shrub layer, and ground cover), was undertaken to determine dominance, co-dominance, and the importance value (I.V.) of each species. These results will be used by the Savannah River Laboratory (SRL) to evaluate the environmental status of Four Mile Creek, Pen Branch, and two upland pine stands. Objectives of this study were to: Describe in detail the plant communities previously mapped with reference to the topography and drainage, including species of plants present: Examine the successional trends within each sampling area and describe the extent to which current vegetation communities have resulted from specific earlier vegetation disturbances (e.g., logging and grazing); describe in detail the botanical field techniques used to sample the flora; describe the habitat and location of protected and/or rare species of plants; and collect and prepare plant species as herbarium quality specimens. Sampling was conducted at Four Mile Creek and Pen Branch, and in two upland pine plantations of different age growth.

Not Available

1992-10-01T23:59:59.000Z

51

Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

2: January 5, 2: January 5, 2009 Vehicle Miles of Travel by Region to someone by E-mail Share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Facebook Tweet about Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Twitter Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Google Bookmark Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Delicious Rank Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on Digg Find More places to share Vehicle Technologies Office: Fact #552: January 5, 2009 Vehicle Miles of Travel by Region on AddThis.com... Fact #552: January 5, 2009

52

Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

7: July 29, 2002 7: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type to someone by E-mail Share Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Facebook Tweet about Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Twitter Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Google Bookmark Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Delicious Rank Vehicle Technologies Office: Fact #227: July 29, 2002 Vehicle Miles of Travel (VMT) and Age by Vehicle Type on Digg Find More places to share Vehicle Technologies Office: Fact #227:

53

Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: September 8, 5: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 to someone by E-mail Share Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Facebook Tweet about Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Twitter Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Google Bookmark Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Delicious Rank Vehicle Technologies Office: Fact #535: September 8, 2008 Vehicle Miles of Travel (VMT) Declines in 2008 on Digg Find More places to share Vehicle Technologies Office: Fact #535:

54

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon)  

U.S. Energy Information Administration (EIA)

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon) U.S. Energy Information Administration / Monthly Energy Review August 2013 17

55

Three Mile Island accident and post-accident recovery: what did we learn  

SciTech Connect

A description of the accident at Three Mile Island-2 reactor is presented. Activities related to the cleanup and decontamination of the reactor are described.

Collins, E.D.

1982-01-01T23:59:59.000Z

56

Table A1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel ...  

U.S. Energy Information Administration (EIA)

Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel 2001 Household and Vehicle Expenditures ... Age of Primary Driver 16 to 17 Years ...

57

TMI-2 (Three Mile Island Unit 2) core region defueling  

SciTech Connect

In July of 1982, a video camera was inserted into the Three Mile Island Unit 2 reactor vessel providing the first visual evidence of core damage. This inspection, and numerous subsequent data acquisition tasks, revealed a central void /approx/1.5 m (5 ft) deep. This void region was surrounded by partial length fuel assemblies and ringed on the periphery by /approx/40 full-length, but partial cross-section, fuel assemblies. All of the original 177 fuel assemblies exhibited signs of damage. The bottom of the void cavity was covered with a bed of granular rubble, fuel assembly upper end fittings, control rod spiders, fuel rod fragments, and fuel pellets. It was obvious that the normal plant refueling system not suitable for removing the damaged core. A new system of defueling tools and equipment was necessary to perform this task. Design of the new system was started immediately, followed by >1 yr of fabrication. Delivery and checkout of the defueling system occurred in mid-1985. Actual defueling was initiated in late 1985 with removal of the debris bed at the bottom of the core void. Obstructions to the debris, such as end fittings and fuel rod fragments ere removed first; then /approx/23,000 kg (50,000lb) of granular debris was quickly loaded into canisters. Core region defueling was completed in late 1987, /approx/2 yr after it was initiated.

Rodabaugh, J.M.; Cowser, D.K.

1988-01-01T23:59:59.000Z

58

Heatup of the TMI-2 (Three Mile Island Unit 2) lower head during core relocation  

SciTech Connect

According to current perceptions of the Three Mile Island Unit 2 (TMI-2) accident, corium largely relocated into the reactor vessel lower head at {approximately}224 min into the accident. Defueling examinations have revealed that the corium relocated from the molten core region to the lower head predominantly by way of drainage through the core former region (CFR) located between the vertical baffle plates immediately surrounding the fuel assemblies and the core barrel. An analysis has been carried out to assess the heatup of the reactor vessel lower head during the core relocation event, particularly the potential for a melting attack on the lower head wall and the in-core instrument nozzle penetration weldments. The analysis employed the THIRMAL computer code developed at Argonne National Laboratory (ANL) to predict the breakup and quenching or corium jets under film boiling conditions as well as the size distributions and quenching of the resultant molten droplets. The transient heatup and ablation of the vessel wall and penetration weldments due to impinging corium jets was calculated using the MISTI computer code.

Wang, S.K.; Sienicki, J.J.; Spencer, B.W. (Argonne National Laboratory, IL (USA))

1989-11-01T23:59:59.000Z

59

Historical summary of the Three Mile Island Unit 2 core debris transportation campaign  

Science Conference Proceedings (OSTI)

Transport of the damaged core materials from the Unit 2 reactor of the Three Mile Island Nuclear Power Station (TMI-2) to the Idaho National Engineering Laboratory (INEL) for examination and storage presented many technical and institutional challenges, including assessing the ability to transport the damaged core; removing and packaging core debris in ways suitable for transport; developing a transport package that could both meet Federal regulations and interface with the facilities at TMI-2 and the INEL; and developing a transport plan, support logistics, and public communications channels suited to the task. This report is a historical summary of how the US Department of Energy addressed those challenges and transported, received, and stored the TMI-2 core debris at the INEL. Subjects discussed include preparations for transport, loading at TMI-2, institutional issues, transport operations, receipt and storage at the INEL, governmental inquiries/investigations, and lessons learned. Because of public attention focused on the TMI-2 Core Debris Transport Program, the exchange of information between the program and public was extensive. This exchange is a focus for parts of this report to explain why various operations were conducted as they were and why certain technical approaches were employed. And, because of that exchange, the program may have contributed to a better public understanding of such actions and may contribute to planning and execution of similar future actions.

Schmitt, R.C.; Tyacke, M.J. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Quinn, G.J. [Wastren, Inc., Germantown, MD (United States)

1993-03-01T23:59:59.000Z

60

Miles Below the Earth: The Next-Generation of Geothermal Energy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy Miles Below the Earth: The Next-Generation of Geothermal Energy February 7, 2011 - 12:34pm Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs What will the project do? Enhanced geothermal systems (EGS) essentially create man-made reservoirs that mimic naturally occurring pockets of steam- with the potential for use as a reliable, 24/7 source of renewable energy. For more than a century, traditional geothermal power plants have been generating electricity by extracting pockets of steam found miles below the Earth's surface. Until recently though, those plants could only be constructed in locations where pockets of steam had formed naturally. Enhanced geothermal systems (EGS) have been crafted to solve that problem

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Rock Sampling At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Rock Sampling Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

62

Autonomous personal vehicle for the first- and last-mile transportation services  

E-Print Network (OSTI)

This paper describes an autonomous vehicle testbed that aims at providing the first- and last- mile transportation services. The vehicle mainly operates in a crowded urban environment whose features can be extracted a ...

Chong, Z. J.

63

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Energy.gov (U.S. Department of Energy (DOE))

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

64

Does telecommuting reduce vehicle-miles traveled? An aggregate time series analysis for the US  

E-Print Network (OSTI)

of Telecommuting. US DOE Office of Policy, Planning, andProgram Evaluation, Report No. DOE/PO-0026, Washington, DC.Holtzclaw, John (undated): Does a mile in a car equal a

Choo, Sangho; Mokhtarian, Patricia L; Salomon, Ilan

2005-01-01T23:59:59.000Z

65

Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) | Open Energy  

Open Energy Info (EERE)

Seven Mile Hole Area (Larson, Et Al., 2009) Seven Mile Hole Area (Larson, Et Al., 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Field Mapping At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Field Mapping Activity Date Usefulness not indicated DOE-funding Unknown Notes The distribution of hydrothermally altered rocks was mapped over about 1 km2 in the Sevenmile Hole area. Two to four kilogram hand samples located by a handheld GPS were collected from many outcrops K735for laboratory analyses References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The

66

Three Mile Island Unit-2 core status summary: a basis for tool development for reactor disassembly and defueling  

DOE Green Energy (OSTI)

The accident at Three Mile Island Unit-2 (TMI-2) on March 28, 1979 caused extensive damage to the core. A variety of analyses were performed using three general approaches to determine the extent of core damage. First, thermal-hydraulic events were reconstructed using available data, thermal-hydraulic principles, and computer analyses. Second, determinations of the hydrogen generated yielded estimates of the amount of zircaloy oxidized and embrittled. Third, the type and quantity of fission products released during the accident were used to estimate the location of core damage and the fuel temperatures which were achieved. Uncertainties exist in each type of determination due to the equivocal nature of the data. This paper reviews and summarizes the core damage assessments which have been made, identifies the minimum and maximum bounds of damage, and establishes a reference description for the current status of the core.

Croucher, D.W.

1981-05-01T23:59:59.000Z

67

Toward 300 Miles on a Single Charge? | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Toward 300 Miles on a Single Charge? Toward 300 Miles on a Single Charge? Discovery & Innovation Stories of Discovery & Innovation Brief Science Highlights SBIR/STTR Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.27.13 Toward 300 Miles on a Single Charge? Berkeley Lab scientists design a high-performance, long cycle-life lithium-sulfur battery. Print Text Size: A A A Subscribe FeedbackShare Page Click to enlarge photo. Enlarge Photo Scanning electron microscope image of sulfur graphene oxide. Photo courtesy of Lawrence Berkeley National Laboratory Scanning electron microscope image of sulfur graphene oxide. The batteries that pervade your life these days-from your cell phone to your sleek new tablet and even to your automobile, if you happen to drive

68

Isotopic Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) | Open  

Open Energy Info (EERE)

2009) 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis- Rock At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Isotopic Analysis- Rock Activity Date Usefulness useful DOE-funding Unknown Notes The 40Ar/39Ar data were collected from a single fragment of alunite from sample Y-05-25, approximately 0.5 cm3 in size. References Peter B. Larson, Allison Phillips, David John, Michael Cosca, Chad Pritchard, Allen Andersen, Jennifer Manion (2009) A Preliminary Study Of Older Hot Spring Alteration In Sevenmile Hole, Grand Canyon Of The Yellowstone River, Yellowstone Caldera, Wyoming Retrieved from "http://en.openei.org/w/index.php?title=Isotopic_Analysis_At_Seven_Mile_Hole_Area_(Larson,_Et_Al.,_2009)&oldid=68747

69

Proposed study program of the effects on Hanford of a dam at Columbia River mile 348  

DOE Green Energy (OSTI)

At the request of Hanford Operations Office, Atomic Energy Commission, a study was made of the effects on the Hanford Facilities of a navigation and power dam at Columbia River mile 348, about five miles upstream of the 300 Area. The original study was based on a nominal slack-water pool elevation of 395 to 400 feet at the dam location. A supplemental study evaluated the effects on plant facilities of a dam at the same location but with slack-water pool elevation of 385 feet. In addition to effects of the dam on Hanford, a study was performed to evaluate the effects the dam would have on the environment.

Jasko, R.T.

1959-06-30T23:59:59.000Z

70

OVERVIEW OF ASSESSMENT PROBLEM FORMULATION 199 Figure 4.44 Five-Mile Creek SSO discharge during Figure 4.45 Five-Mile Creek under normal flow  

E-Print Network (OSTI)

for a significant portion of the dry-weather * Color figures follow page 370. #12;200 STORMWATER EFFECTS HANDBOOK-diameter plastic pipes (with coarse screening on the ends) for protection and anchored in the streams. Bags were

Pitt, Robert E.

71

Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint  

DOE Green Energy (OSTI)

Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

2011-01-01T23:59:59.000Z

72

Comparative analysis of nuclear crisis communication: 2011 Fukushima nuclear crisis and 1979 Three Mile Island nuclear crisis.  

E-Print Network (OSTI)

??This paper examines the crisis management of two prominent nuclear crises - 2011 Fukushima Nuclear Crisis in Japan and 1979 Three Mile Island Nuclear Crisis (more)

Lu, Yang

2012-01-01T23:59:59.000Z

73

Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al.,  

Open Energy Info (EERE)

2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Compound and Elemental Analysis At Seven Mile Hole Area (Larson, Et Al., 2009) Exploration Activity Details Location Seven Mile Hole Area Exploration Technique Compound and Elemental Analysis Activity Date Usefulness not indicated DOE-funding Unknown Notes Standard X-ray diffractometer (XRD) analyses were used in the laboratory to confirm the PIMA mineral identifications and to look for minerals that have poor SWIR response (e.g., quartz and feldspars) or were not present in great enough concentrations to be detected by the PIMA. Petrographic and electron microprobe analyses of selected samples were conducted in the laboratories of the GeoAnalytical Laboratory at Washington State

74

"Table 11. Fuel Economy, Selected Survey Years (Miles Per Gallon)"  

U.S. Energy Information Administration (EIA) Indexed Site

Fuel Economy, Selected Survey Years (Miles Per Gallon)" Fuel Economy, Selected Survey Years (Miles Per Gallon)" ,"Survey Years" ,1983,1985,1988,1991,1994,2001 "Total",15.1,16.1,18.3,19.3,19.8,20.2 "Household Characteristics" "Census Region and Division" " Northeast",15.6,"NA",19.6,20.9,20.7,20.85531 " New England",16.5,"NA",19.7,21.1,20.4,20.97907 " Middle Atlantic ",15.3,"NA",19.6,20.8,20.8,20.79659 " Midwest ",14.8,"NA",18.2,19,20.1,20.18362 " East North Central",14.9,"NA",18.4,19.4,20.1,20.26056 " West North Central ",14.5,"NA",17.8,17.9,20,20.01659 " South",15,"NA",18,19.2,19.6,20.17499 " South Atlantic",15.6,"NA",19,20.2,20.2,20.5718

75

MHK Projects/Thirty Five Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Thirty Five Mile Point Project Thirty Five Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.0146,"lon":-90.4774,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

76

18 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August  

Office of Legacy Management (LM)

8 MILES NORTH OF PHlLADEl.PHlA 8 MILES NORTH OF PHlLADEl.PHlA HATBORO, PA. August 27, 1948 ! ! Frank Giaccio' Commission / I This follows my letter of August ZOth, in which I promised to advise you of our thoughts concerning beryllium, after I had completed a series of con- tacts with both.Government and private,grou?s and had an opportunity to evaluate the possibilities of using our process from the point of view of industrial research. By this, I meanthe possibility of the research leading into substantial production of parts. I believe I mentioned some of the contacts to you when I was in your office, and that we still had more to make. It is my opinion now that as far as beryllium is concerned, I cannot visualize the possibility of large production runs of parts; because it is

77

MHK Projects/Eighty One Mile Point Project | Open Energy Information  

Open Energy Info (EERE)

Eighty One Mile Point Project Eighty One Mile Point Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.16,"lon":-91.0056,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

78

Three Mile Island Plugged Tube Severance: A Study of Damage Mechanisms  

Science Conference Proceedings (OSTI)

During Fall 2001 outages, eddy-current inspections at Three Mile Island Unit 1 and Oconee Nuclear Station Unit 1 revealed wear scars on tubes surrounding previously plugged tubes. In both cases, investigations determined that the plugged tubes had severed and impacted neighboring tubes. As a result, the Nuclear Regulatory Commission (NRC) issued Information Notice 2002-02, which did not require a response but did suggest the industry investigate the generic problem of plugged tubes damaging neighboring t...

2003-05-19T23:59:59.000Z

79

Nondestructive techniques for assaying fuel debris in piping at Three Mile Island Unit 2  

SciTech Connect

Four major categories of nondestructive techniques - ultrasonic, passive gamma ray, infrared detection, and remote video examination - have been determined to be feasible for assaying fuel debris in the primary coolant system of the Three Mile Island Unit 2 (TMI-2) Reactor. Passive gamma ray detection is the most suitable technique for the TMI-2 piping; however, further development of this technique is needed for specific application to TMI-2.

Vinjamuri, K.; McIsaac, C.V.; Beller, L.S.; Isaacson, L.; Mandler, J.W.; Hobbins, R.R. Jr.

1981-11-01T23:59:59.000Z

80

Table 5.1. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

. U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption . U.S. Number of Vehicles, Vehicle-Miles, Motor Fuel Consumption and Expenditures, 1994 1993 Household and 1994 Vehicle Characteristics RSE Column Factor: Number of Vehicles Vehicle-Miles Traveled Motor Fuel Consumption Motor Fuel Expenditures RSE Row Factor: (million) (percent) (billion) (percent) (billion gallons) (gallon percent) (quadril- lion Btu) (billion dollars) (percent) 0.9 0.8 1.1 1.0 1.1 1.0 1.1 1.1 1.0 Household Characteristics Total .................................................... 156.8 100.0 1,793 100.0 90.6 100.0 11.2 104.7 100.0 2.8 Census Region and Division Northeast ........................................... 26.6 17.0 299 16.7 14.5 16.0 1.8 17.2 16.4 5.7 New England ................................... 7.6 4.8 84 4.7 4.1 4.5 0.5 4.8 4.6 13.8 Middle Atlantic

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Nuclear accident at Three Mile Island: its effect on a local community  

Science Conference Proceedings (OSTI)

This dissertation consists of a longitudinal case study of the extent to which the structure of community power in Riverside, (a pseudonym) Pennsylvania (the largest community located within five miles of the Three Mile Island nuclear facility) changed as a result of the March, 1979 accident. The investigation centers around testing a basic working hypothesis. Simply stated, this working hypothesis argues that Riverside's power structure has become more pluralistic in response to the Three Mile Island nuclear accident. An additional corollary to this working hypothesis is also tested. This corollary asserts that many of Riverside's community power actors have become much more cosmopolitan in their political-action tactics and problem-solving orientations as a results of the TMI crisis. The aforementioned working hypothesis and associated corollary are tested via the combined utilization of three different techniques for measuring the distribution of social power. The findings of the study clearly demonstrate the existence of increased pluralism, politicization, and cosmopolitanism within Riverside since March of 1979. Furthermore, these research results, and the entire dissertation itself, contribute to a number of subfields within the discipline of sociology. In particular,contributions are noted for the subfields of community power, social movements, and disaster research.

Behler, G.T. Jr.

1987-01-01T23:59:59.000Z

82

50,000 mile methanol/gasoline blend fleet study: a progress report  

DOE Green Energy (OSTI)

Seven current production automobiles are being used in a fleet study to obtain operational experience in using 10% methanol/90% gasoline blends as an automotive fuel. Data from chassis dynamometer tests (run according to the 1975--1978 Federal test procedure) have been obtained, showing fuel economy and exhaust emissions of carbon monoxide, oxides of nitrogen, unburned fuel, methanol, and aldehydes. These data are shown for each of the vehicles when operated on the 10% methanol blend, and on unleaded low octane Indolene. Chassis dynamometer tests were run at 5,000-mile intervals during the 35,000 miles accumulated on each of the four 1977 model-year vehicles and at 5,000 and 10,000 mile accumulation levels for each of the three 1978 model-year vehicles. These data show an average decrease in volumetric fuel economy (approx. = 5%) and a reduction in carbon monoxide emissions associated with the use of the 10% methanol blend. Exhaust emission deterioration factors are projected from the Federal test procedure urban cycle data. The most severe driveability problems that have been encountered thus far into the program are related to operating on a phase separated fuel and materials compatibility problems with an elastomer in the air-fuel control hardware of one vehicle.

Stamper, K R

1979-01-01T23:59:59.000Z

83

Research and development activities on Three Mile Island Unit Two. Annual report for 1985  

Science Conference Proceedings (OSTI)

The year 1985 was significant in the cleanup of Three Mile Island Unit 2 (TMI-2). Major milestones in the project included lifting the plenum assembly from the reactor vessel and the start of operations to remove the damaged fuel from the reactor. This report summarizes these milestones and other TMI-2 related cleanup, research, and development activities. Other major topics include the following: waste immobilization and management; fuel shipping cask delivery and testing; sample acquisition and evaluation; and decontamination and dose reduction. 26 figs.

Not Available

1986-04-01T23:59:59.000Z

84

Compilation of Earthquakes from 1850-2007 within 200 miles of the Idaho National Laboratory  

SciTech Connect

An updated earthquake compilation was created for the years 1850 through 2007 within 200 miles of the Idaho National Laboratory. To generate this compilation, earthquake catalogs were collected from several contributing sources and searched for redundant events using the search criteria established for this effort. For all sets of duplicate events, a preferred event was selected, largely based on epicenter-network proximity. All unique magnitude information for each event was added to the preferred event records and these records were used to create the compilation referred to as INL1850-2007.

N. Seth Carpenter

2010-07-01T23:59:59.000Z

85

Data integrity review of Three Mile Island Unit 2. Hydrogen burn data. Volume 3  

DOE Green Energy (OSTI)

About 10 hours after the March 28, 1979 loss-of-coolant accident began at Three Mile Island Unit 2 (TMI-2), a hydrogen burn occurred inside the Reactor Building. This report reviews and presents data from 16 channels of resistance temperature detectors (RTDs), 2 steam generator pressure transmitters, 16 Reactor Building pressure switches, 2 channels of Reactor Building pressure measurements, and measurements of Reactor Building hydrogen, oxygen, and nitrogen concentrations with regard to their usefulness for determining the extent of the burn and the resulting pressure and temperature excursions inside the building.

Jacoby, J.K.; Nelson, R.A.; Nalezny, C.L.; Averill, R.H.

1983-09-01T23:59:59.000Z

86

Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Genetic Genetic Variability of Cell Wall Degradability for the Selection of Alfalfa with Improved Saccharification Efficiency Marc-Olivier Duceppe & Annick Bertrand & Sivakumar Pattathil & Jeffrey Miller & Yves Castonguay & Michael G. Hahn & Réal Michaud & Marie-Pier Dubé # Her Majesty the Queen in Right of Canada 2012 Abstract Alfalfa (Medicago sativa L.) has a high potential for sustainable bioethanol production, particularly because of its low reliance on N fertilizer. We assessed near-infrared reflec- tance spectroscopy (NIRS) as a high-throughput technique to measure cell wall (CW) degradability in a large number of lignified alfalfa stem samples. We also used a powerful immu- nological approach, glycome profiling, and chemical analyses to increase our knowledge of the composition of CW poly- saccharides of alfalfa stems with various levels

87

Seven Mile Hill I & II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

I & II Wind Farm I & II Wind Farm Jump to: navigation, search Name Seven Mile Hill I & II Wind Farm Facility Seven Mile Hill I & II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PacifiCorp Developer PacifiCorp Energy Purchaser PacifiCorp Location Between Hanna and Medicine Bow WY Coordinates 41.939079°, -106.372225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.939079,"lon":-106.372225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

Lessons Learned from Three Mile Island Packaging, Transportation and Disposition that Apply to Fukushima Daiichi Recovery  

SciTech Connect

Following the massive earthquake and resulting tsunami damage in March of 2011 at the Fukushima Daiichi nuclear power plant in Japan, interest was amplified for what was done for recovery at the Three Mile Island Unit 2 (TMI-2) in the United States following its meltdown in 1979. Many parallels could be drawn between to two accidents. This paper presents the results of research done into the TMI-2 recovery effort and its applicability to the Fukushima Daiichi cleanup. This research focused on three topics: packaging, transportation, and disposition. This research work was performed as a collaboration between Japans Central Research Institute of Electric Power Industry (CRIEPI) and the Idaho National Laboratory (INL). Hundreds of TMI-2 related documents were searched and pertinent information was gleaned from these documents. Other important information was also obtained by interviewing employees who were involved first hand in various aspects of the TMI-2 cleanup effort. This paper is organized into three main sections: (1) Transport from Three Mile Island to Central Facilities Area at INL, (2) Transport from INL Central Receiving Facility to INL Test Area North (TAN) and wet storage at TAN, and (3) Transport from TAN to INL Idaho Nuclear Technology and Engineering Center (INTEC) and Dry Storage at INTEC. Within each of these sections, lessons learned from performing recovery activities are presented and their applicability to the Fukushima Daiichi nuclear power plant cleanup are outlined.

Layne Pincock; Wendell Hintze; Dr. Koji Shirai

2012-07-01T23:59:59.000Z

89

Assessment of the Greenhouse Gas Emission Reduction Potential of Ultra-Clean Hybrid-Electric Vehicles  

E-Print Network (OSTI)

ENERGY USAGE, AND GREENHOUSE EMISSIONS GAS 4. ASSESSMENT ANDgas consumption (miles per gallon or Wh mile) of a vehicle, calculation of the fuel usageGas from Biomass from Solar Carbon Dioxide Table 2: [gin ~mlsslons~-~iJfr Usage

Burke, A.F.; Miller, M.

1997-01-01T23:59:59.000Z

90

Analysis of the Three Mile Island Unit 2 hydrogen burn. Volume 4  

DOE Green Energy (OSTI)

As a basis for the analysis of the hydrogen burn which occurred in the Three Mile Island Containment on March 28, 1979, a study of recorded temperatures and pressures was made. Long-term temperature information was obtained from the multipoint temperature recorder which shows 12 containment atmosphere temperatures plotted every 6 min. The containment atmosphere pressure recorder provided excellent long- and short-term pressure information. Short-term information was obtained from the multiplex record of 24 channels of data, recorded every 3 sec, and the alarm printer record which shows status change events and prints out temperatures, pressures, and the time of the events. The timing of these four data recording systems was correlated and pertinent data were tabulated, analyzed, and plotted to show average containment temperature and pressure versus time. Photographs and videotapes of the containment entries provided qualitative burn information.

Henrie, J.O.; Postma, A.K.

1983-03-01T23:59:59.000Z

91

Investigation of hydrogen-burn damage in the Three Mile Island Unit 2 reactor building  

DOE Green Energy (OSTI)

About 10 hours after the March 28, 1979 Loss-of-Coolant Accident began at Three Mile Island Unit 2, a hydrogen deflagration of undetermined extent occurred inside the reactor building. Examinations of photographic evidence, available from the first fifteen entries into the reactor building, yielded preliminary data on the possible extent and range of hydrogen burn damage. These data, although sparse, contributed to development of a possible damage path and to an estimate of the extent of damage to susceptible reactor building items. Further information gathered from analysis of additional photographs and samples can provide the means for estimating hydrogen source and production rate data crucial to developing a complete understanding of the TMI-2 hydrogen deflagration. 34 figures.

Alvares, N.J.; Beason, D.G.; Eidem, G.R.

1982-06-01T23:59:59.000Z

92

The Cleanup of Three Mile Island Unit 2, A Technical History: 1979 to 1990: A Technical History: 1979 to 1990  

Science Conference Proceedings (OSTI)

The fuel damage and the release of fission products after the Three Mile Island unit 2 (TMI-2) accident required unprecedented decisions regarding the enormous cleanup operations. The rationale for those decisions will provide valuable information for other managers who may face similar situations. Planning and response procedures can benefit from the insights gained from the TMI-2 accident.

1990-10-01T23:59:59.000Z

93

Analysis of soil and water at the Four Mile Creek seepline near the F- and H-Areas of SRS  

Science Conference Proceedings (OSTI)

Several soil and water samples were collected along the Four Mile Creek (FMC) seepline at the F and H Areas of the Savannah River Site. The samples were analyzed for concentrations of metals, radionuclides, and inorganic constituents. The results of the analyses are summarized for the soil and water samples.

Haselow, J.S.

2000-05-24T23:59:59.000Z

94

Population estimates for the areas within a 50-mile radius of four reference points on the Hanford Site  

SciTech Connect

This report presents population distributions within a 50-mile radius of four locations on the Hanford Site. The results are based on the US Bureau of Census 1980 population counts for Washington and Oregon. These results are documented in Tables 2 to 13 and 15 to 18 of this report.

Sommer, D.J.; Rau, R.G.; Robinson, D.C.

1981-11-01T23:59:59.000Z

95

Timing of the Three Mile Island Unit 2 core degradation as determined by forensic engineering  

DOE Green Energy (OSTI)

Unlike computer simulation of an event, forensic engineering is the evaluation of recorded data and damaged as well as surviving components after an event to determine progressive causes of the event. Such an evaluation of the 1979 Three Mile Island Unit 2 accident indicates that gas began accumulating in steam, generator A at 6:10, or 130 min into the accident and, therefore, fuel cladding ruptures and/or zirconium-water reactions began at that time. Zirconium oxidation/hydrogen generation rates were highest ({approximately}70 kg of hydrogen per minute) during the core quench and collapse at 175 min. By 180 min, over 85% of the hydrogen generated by the zirconium-water reaction had been produced, and {approximately}400 kg of hydrogen had accumulated in the reactor coolant system. At that time, hydrogen concentrations at the steam/water interfaces in both steam generators approached 90%. By 203 min, the damaged reactor core had been reflooded and has not been uncovered since that time. Therefore, the core was completely under water at 225 min, when molten core material flowed into the lower head of the reactor vessel. 10 refs., 7 figs., 1 tab.

Henrie, J.O. (Hydrogen Control, Inc., Panguitch, UT (USA))

1988-01-01T23:59:59.000Z

96

Assessment of thermal damage to polymeric materials by hydrogen deflagration in the Three Mile Island Unit 2 Reactor Building  

DOE Green Energy (OSTI)

Thermal damage to susceptible material in accessible regions of the reactor building was distributed in non-uniform patterns. No clear explanation for non-uniformity was found in examined evidence, e.g., burned materials were adjacent to materials that appear similar but were not burned. Because these items were in proximity to vertical openings that extend the height of the reactor building, we assume the unburned materials preferentially absorbed water vapor during periods of high, local steam concentration. Simple hydrogen-fire-exposure tests and heat transfer calculations duplicate the degree of damage found on inspected materials from the containment building. These data support estimated 8% pre-fire hydrogen concentration predictions based on various hydrogen production mechanisms.

Alvares, N.J.

1985-05-01T23:59:59.000Z

97

Radiation effects on resins and zeolites at Three Mile Island Unit II  

DOE Green Energy (OSTI)

Radiation effects on resin and zeolite used in the waste cleanup at Three Mile Island Unit II have been examined both experimentally and in-situ. Hydrogen and organic gases are generated due to absorbed radiation as a function of resin material, curie loading and residual water content. Significant oxygen scavaging was demonstrated in the organic resin liners. Hydrogen and oxygen gases in near stoichiometric quantities are generated from irradiation of residual water in inorganic zeolites. Gas generation was determined to be directly proportional to curie content but correlates poorly with residual water content in zeolite vessels. Results of the gas generation analyses of EPICOR II liners show that vessels with less than 166 curies had almost no hydrogen generated during two years of storage and therefore did not require safety measures for shipment or storage. Experimental measurements done at research laboratories predicted similar results associated with hydrogen gas generation and oxygen depletion. X-ray diffraction examinations and ion exchange capacity measurements indicated no evidence of irradiation effects on the structure or cesium exchange capacity for zeolites exposed to 10/sup 10/ rads. Darkening and damage of organic resin due to radiation has been identified. Breaking and agglomeration of the purification demineralizer resin is believed to be the result of temperature effects. No damage was identified from radiation effects on zeolite. Organic and inorganic sorbents used in the processing of contaminated waters at TMI-2 have been shown to be effective in maintaining long-term stability under high radiation conditions. The effects of radiolytic degradation have been shown by direct measurements and simulation tests and are of use in their general application throughout the industry.

Reilly, J.K.; Grant, P.J.; Quinn, G.J.; Hofstetter, K.J.

1984-01-01T23:59:59.000Z

98

DOE Hydrogen and Fuel Cells Program Record 5038: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Date: May 22, 2006 8 Date: May 22, 2006 Title: Hydrogen Cost Competitive on a Cents per Mile Basis - 2006 Originator: Patrick Davis & Steve Chalk Approved by: JoAnn Milliken Approval Date: May 22, 2006 Item : Lower the cost of hydrogen from natural gas to be competitive on a cents per mile basis with conventional gasoline vehicles. Supporting Information: The results of a 2003 economic analysis were used to estimate the cost of hydrogen produced from distributed natural gas reforming at $5 per gallon of gasoline equivalent (gge) (See U.S. DOE Record 5030: Hydrogen Baseline Cost of $5 per gge in 2003; available at http://www.hydrogen.energy.gov/program_records). Since the original analysis, DOE-sponsored R&D has resulted in significant cost reductions,

99

Methodology for Estimating ton-Miles of Goods Movements for U.S. Freight Mulitimodal Network System  

SciTech Connect

Ton-miles is a commonly used measure of freight transportation output. Estimation of ton-miles in the U.S. transportation system requires freight flow data at disaggregated level (either by link flow, path flows or origin-destination flows between small geographic areas). However, the sheer magnitude of the freight data system as well as industrial confidentiality concerns in Census survey, limit the freight data which is made available to the public. Through the years, the Center for Transportation Analysis (CTA) of the Oak Ridge National Laboratory (ORNL) has been working in the development of comprehensive national and regional freight databases and network flow models. One of the main products of this effort is the Freight Analysis Framework (FAF), a public database released by the ORNL. FAF provides to the general public a multidimensional matrix of freight flows (weight and dollar value) on the U.S. transportation system between states, major metropolitan areas, and remainder of states. Recently, the CTA research team has developed a methodology to estimate ton-miles by mode of transportation between the 2007 FAF regions. This paper describes the data disaggregation methodology. The method relies on the estimation of disaggregation factors that are related to measures of production, attractiveness and average shipments distances by mode service. Production and attractiveness of counties are captured by the total employment payroll. Likely mileages for shipments between counties are calculated by using a geographic database, i.e. the CTA multimodal network system. Results of validation experiments demonstrate the validity of the method. Moreover, 2007 FAF ton-miles estimates are consistent with the major freight data programs for rail and water movements.

Oliveira Neto, Francisco Moraes [ORNL; Chin, Shih-Miao [ORNL; Hwang, Ho-Ling [ORNL

2013-01-01T23:59:59.000Z

100

Citrus County Extension Office From I-75, take Exit # 329 (old # 66), SR 44 and go West on SR 44 toward Inverness/Crystal River (approx. 17 miles). Follow SR 44  

E-Print Network (OSTI)

on SR 44 toward Inverness/Crystal River (approx. 17 miles). Follow SR 44 through Inverness to traffic

Watson, Craig A.

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Review of Destructive Assay Methods for Nuclear Materials Characterization from the Three Mile Island (TMI) Fuel Debris  

SciTech Connect

This report provides a summary of the literature review that was performed and based on previous work performed at the Idaho National Laboratory studying the Three Mile Island 2 (TMI-2) nuclear reactor accident, specifically the melted fuel debris. The purpose of the literature review was to document prior published work that supports the feasibility of the analytical techniques that were developed to provide quantitative results of the make-up of the fuel and reactor component debris located inside and outside the containment. The quantitative analysis provides a technique to perform nuclear fuel accountancy measurements

Carla J. Miller

2013-09-01T23:59:59.000Z

102

Fish Passage Improvements at Three Mile Falls Diversion Dam, Umatilla River, Oregon, Final Completion Report.  

DOE Green Energy (OSTI)

This report contains the results and conclusions from the biological assessment and outlines several alternative plans for solving fish passage problems at the dam. A recommended plan, based on consensus of the fisheries agencies and the tribes, is described, and the rationale for that decision is discussed. Data needs for final designs, a tentative construction schedule, and a discussion of operation and maintenance needs are presented.

Unknown Author

1985-05-01T23:59:59.000Z

103

Inventory of thermal springs and wells within a one-mile radius of Yucca Lodge, Truth or Consequences, New Mexico  

DOE Green Energy (OSTI)

Equity Management Corporation proposes (1) to build about 30 condominiums at the present site of the Yucca Lodge, Truth or Consequences, New Mexico and (2) to heat the condominiums with the natural thermal waters that discharge from the property. To do so the corporation must satisfy the rules and regulations of four state and federal agencies. To satisfy some of the data requirements of these agencies and to provide basic data on the geohydrology of the area this report provides the results of a field inventory of the springs and wells within one mile of the lodge. Table 1 summarizes the data for eight springs and three sites where springs once issued. Table 2 summarizes the data on forty-four operable wells and thirty wells that are unusable in their present condition. Appendices list (1) wells presumed to be in the area but not located during field inspection and (2) wells that could be in the area, but were found to be beyond the one-mile radius. Temperature and specific conductance of the water show only minor variation within the recognized hot-water.

Schwab, G.E.

1982-02-01T23:59:59.000Z

104

An Econometric Analysis of the Elasticity of Vehicle Travel with Respect to Fuel Cost per Mile Using RTEC Survey Data  

Science Conference Proceedings (OSTI)

This paper presents the results of econometric estimation of the ''rebound effect'' for household vehicle travel in the United States based on a comprehensive analysis of survey data collected by the U.S. Energy Information Administration (EIA) at approximately three-year intervals over a 15-year period. The rebound effect is defined as the percent change in vehicle travel for a percent change in fuel economy. It summarizes the tendency to ''take back'' potential energy savings due to fuel economy improvements in the form of increased vehicle travel. Separate vehicles use models were estimated for one-, two-, three-, four-, and five-vehicle households. The results are consistent with the consensus of recently published estimates based on national or state-level data, which show a long-run rebound effect of about +0.2 (a ten percent increase in fuel economy, all else equal, would produce roughly a two percent increase in vehicle travel and an eight percent reduction in fuel use). The hypothesis that vehicle travel responds equally to changes in fuel cost-per-mile whether caused by changes in fuel economy or fuel price per gallon could not be rejected. Recognizing the interdependency in survey data among miles of travel, fuel economy and price paid for fuel for a particular vehicle turns out to be crucial to obtaining meaningful results.

Greene, D.L.; Kahn, J.; Gibson, R.

1999-03-01T23:59:59.000Z

105

Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991  

Science Conference Proceedings (OSTI)

On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

Not Available

1991-10-01T23:59:59.000Z

106

Evaluation of nuclear facility decommissioning projects: Summary status report: Three Mile Island Unit 2. Radioactive waste and laundry shipments  

SciTech Connect

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 through April 19, 1987. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Haffner, D. R.

1988-06-01T23:59:59.000Z

107

Final Environmental Assessment, Burleigh County Wind Energy Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1542 August 2005 Environmental Assessment Environmental Assessment Environmental Assessment Environmental Assessment Environmental Assessment Burleigh County Wind Energy Center Burleigh County, North Dakota Final Burleigh County Wind, LLC BASIN ELECTRIC POWER COOPERATIVE Central Power Electric Cooperative, Inc. Introduction 1-1 Burleigh County Wind Energy Center Environmental Assessment CHAPTER 1 INTRODUCTION The Burleigh County Wind Energy Center is a wind generation project proposed by FPL Energy Burleigh County Wind, LLC (Burleigh County Wind). The proposed project would produce up to 50 megawatts (MW) of electricity, averaged annually. The proposed project is located in Burleigh County, North Dakota, approximately 3 miles south and 2 miles east of the town of Wilton, North Dakota (Figures 1-1

108

Evaluation of Juvenile Fish Bypass and Adult Fish Passage Facilities at Three-Mile Falls Dam; Umatilla River, Oregon, 1989 Annual Report.  

DOE Green Energy (OSTI)

We report on our progress from October 1989 through September 1990 on evaluating juvenile fish bypass and adult fish passage facilities at Three Mile Falls Dam on the Umatilla River. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). Study objectives addressed by ODFW and CTUIR are: (1) ODFW (Report A): Operate and evaluate the juvenile fish bypass system in the West Extension Irrigation District canal at Three Mile Falls Dam; and (2) CTUIR (Report 8): Examine the passage of adult salmonids at Three Mile Falls Dam. The study is part of a program to rehabilitate anadromous fish stocks in the Umatilla River Basin that includes restorations of coho salmon Oncorhynchus Wsutch and chinook salmon 0. tshawytscha and enhancement of summer steelhead 0. mytiss.

Nigro, Anthony A.

1990-09-01T23:59:59.000Z

109

Conductor and Shield Wire Inspection and Assessment  

Science Conference Proceedings (OSTI)

With thousands of miles of transmission lines nearing the end of their expected service life, conductor life and reliability are of increasing concern to many utilities. The consequences of conductor failure can be significant and its impacts widespread. ACSR conductors have been identified as the most problematic of all the conductors because the conductor core cannot be assessed visually. ACSR conductors have a steel stranded core to carry the wire tension load and two or more layers of aluminum strand...

2008-12-10T23:59:59.000Z

110

USGS National Oil and Gas Assessment: GIS Data | OpenEI  

Open Energy Info (EERE)

National Oil and Gas Assessment: GIS Data National Oil and Gas Assessment: GIS Data Dataset Summary Description The USGS Central Region Energy Team assessed the oil and gas resources of the United States. Cell maps for each oil and gas production area were created by the USGS as a method for illustrating the degree of exploration, type of production, and distribution of production in a play. Each cell represents a one-mile (or a one-quarter mile) square of the land surface, and the cells are coded to represent whether the wells included with the cell are predominantly oil-producing, gas-producing, or dry. The data used are current as of December, 1990. Source USGS Date Released March 26th, 1996 (18 years ago) Date Updated Unknown Keywords gas oil Data application/zip icon 1/4 mile cells (well information); plus metadata (zip, 41.8 MiB)

111

Building The last mile'  

SciTech Connect

Utilities may want to leverage the multibillion-dollar investment cable television is about to make. Virtually every utility has corporate objectives to focus more on the customer and change the way the customer is viewed. Utility supply strategy has been shifting away from building large, expensive power plants to making smaller investments with flexible options that can be adjusted to suit future conditions. This strategy is requisite to helping utilities keep and build their share of the market. One result is that utilities and regulators have adopted the concept of demand-side management (DSM) with enthusiasm. What's more, the last 10 years have brought new utility initiatives to explore customer value-oriented pricing structures that recognize the varying cost of production. These DSM opportunities and pricing initiatives require utilities to communicate with customers and help them manage their electricity use. New DSM programs that rely on communications technology include: (1) Providing real-time price signals for electricity-and eventually gas and water; (2) Implementing a direct- or shared-load control program for peak clipping or valley filling by interacting with properly equipped smart appliances; (3) Providing beyond-the-meter value-added services for residential customers, such as weather monitoring, video communications, home comfort automation, appliance monitoring and diagnostics, and energy efficiency tips; and (4) Obtaining detailed data on customers' electricity use patterns to develop new DSM programs. One action by the utility industry will determine whether this strategic vision is achieved: the establishment of a two-way, user-friendly, voice, data, and video communication path to the customer from the utility.

Gupta, P.C.; Bringenberg, J.

1994-03-15T23:59:59.000Z

112

EA-1921: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

921: Final Environmental Assessment 921: Final Environmental Assessment EA-1921: Final Environmental Assessment Silver Peak Area Geothermal Exploration Project Environmental Assessment, Esmeralda County, NV This EA evaluates the potential environmental impacts of a BLM porposal to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project would consist of well and drill pad site preparation and the drilling and testing of two observation wells and four full-sized geothermal wells. The proposed geothermal wells EA would be located approximately one mile east of the community of Silver Peak, Nevada and approximately 55 miles travel distance southwest of Tonopah, Nevada.

113

EA-1921: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1921: Final Environmental Assessment Silver Peak Area Geothermal Exploration Project Environmental Assessment, Esmeralda County, NV This EA evaluates the potential environmental impacts of a BLM porposal to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project would consist of well and drill pad site preparation and the drilling and testing of two observation wells and four full-sized geothermal wells. The proposed geothermal wells EA would be located approximately one mile east of the community of Silver Peak, Nevada and approximately 55 miles travel distance southwest of Tonopah, Nevada.

114

Modal shifts in short-haul passenger travel and the consequent energy impacts. [Intercity travel under 500 miles  

SciTech Connect

A study was performed to evaluate the impacts of strategies to effect modal shifts in short-haul passenger travel (defined herein as intercity travel under 500 miles) from energy-intensive modes to those modes that are less energy-intensive. A series of individual strategies, ranging from incentives to the less energy-intensive modes (bus, rail) to penalties to the more energy-intensive modes (auto, air) was examined to determine energy saved and policy implications relative to strategy implementation. The most effective of the individual strategies were then combined in all permutations, and the analysis was repeated. As part of the analytical process, effects of factors other than energy (user cost and time, emissions, government subsidy, and travel fatailities) were examined in a benefit/cost analysis. Finally, energy savings, benefit/cost impacts, implementation considerations, and policy implications were evaluated to arrive at conclusions as to the effectiveness of the more-influential strategies and to the overall effectiveness of induced modal shifts. The principal conclusion of the study is that the maximum 1980 energy saving that might be realized by modal shifts, discounting the concurrent effects of demand suppression and improvement of mode efficiency, is approximately 83 x 10/sup 12/ Btu (46,500 bbl gasoline per day), 3.8% of the total projected 1980 energy consumption in the short-haul transportation sector and 0.23% of the total US petroleum use. It was also concluded that strategies to achieve these small savings by modal shifts would result in significant economic, social, and business disruptions.

Not Available

1980-03-01T23:59:59.000Z

115

Revisiting Insights from Three Mile Island Unit 2 Postaccident Examinations and Evaluations in View of the Fukushima Daiichi Accident  

Science Conference Proceedings (OSTI)

The Three Mile Island Unit 2 (TMI-2) accident, which occurred on March 28, 1979, led industry and regulators to enhance strategies to protect against severe accidents in commercial nuclear power plants. Investigations in the years after the accident concluded that at least 45% of the core had melted and that nearly 19 tonnes of the core material had relocated to the lower head. Postaccident examinations indicate that about half of that material formed a solid layer near the lower head and above it was a layer of fragmented rubble. As discussed in this paper, numerous insights related to pressurized water reactor accident progression were gained from postaccident evaluations of debris, reactor pressure vessel (RPV) specimens, and nozzles taken from the RPV. In addition, information gleaned from TMI-2 specimen evaluations and available data from plant instrumentation were used to improve severe accident simulation models that form the technical basis for reactor safety evaluations. Finally, the TMI-2 accident led the nuclear community to dedicate considerable effort toward understanding severe accident phenomenology as well as the potential for containment failure. Because available data suggest that significant amounts of fuel heated to temperatures near melting, the events at Fukushima Daiichi Units 1, 2, and 3 offer an unexpected opportunity to gain similar understanding about boiling water reactor accident progression. To increase the international benefit from such an endeavor, we recommend that an international effort be initiated to (a) prioritize data needs; (b) identify techniques, samples, and sample evaluations needed to address each information need; and (c) help finance acquisition of the required data and conduct of the analyses.

Joy Rempe; Mitchell Farmer; Michael Corradini; Larry Ott; Randall Gauntt; Dana Powers

2012-11-01T23:59:59.000Z

116

Evaluation of the Submerged Demineralizer System (SDS) flowsheet for decontamination of high-activity-level water at the Three Mile Island Unit 2 Nuclear Power Station  

Science Conference Proceedings (OSTI)

This report discusses the Submerged Demineralizer System (SDS) flowsheet for decontamination of the high-activity-level water at the Three Mile Island Unit 2 Nuclear Power Station was evaluated at Oak Ridge National Laboratory in a study that included filtration tests, ion exchange column tests, and ion exchange distribution tests. The contaminated waters, the SDS flowsheet, and the experiments made are described. The experimental results were used to predict the SDS performance and to indicate potential improvements.

Campbell, D.O., Collins, E.D., King, L.J., Knauer, J.B.

1980-07-01T23:59:59.000Z

117

EA-1925: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Final Environmental Assessment 25: Final Environmental Assessment EA-1925: Final Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon This EA evaluates Ormat Nevada, Inc.'s (Ormat's) proposed geothermal projects which involve drilling up to 16 wells for geothermal exploration approximately 70 miles southeast of Bend, Oregon and 50 miles northwest of Burns, Oregon just south of U.S. Highway 20. The proposed project includes three distinct drilling areas. Up to three wells would be drilled on lands managed by the Bureau of Land Management (BLM) Prineville District (Mahogany), up to ten wells would be drilled on lands managed by the BLM Burns District (Midnight Point), and up to three wells would be drilled on private land located adjacent to the federal geothermal leases west of

118

EA-1855: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

119

EA-1759: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1759: Final Environmental Assessment EA-1759: Final Environmental Assessment EA-1759: Final Environmental Assessment Southwest Alaska Regional Geothermal Energy Project The purpose of this report is to identify and describe wetlands at a location approximately 5 miles northeast of King Salmon, Alaska. The general location of the site is in southwestern Alaska, near the northeastern end of Bristol Bay on the north side of the Naknek River, between King Salmon and Naknek Lake. Approximately 154 acres of Naknek Electrical Association (NEA) property is proposed for geothermal exploration. The site includes a proposed 100-foot-wide road corridor beginning at approximately 3 miles west along an unimproved road from Naknek II Recreation Camp (also known as Lake Camp) on Naknek Lake. The road corridor extends north and northeast approximately to the NEA

120

EA-1617: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EA-1447: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

447: Final Environmental Assessment 447: Final Environmental Assessment EA-1447: Final Environmental Assessment Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico The Proposed Action is to construct and operate offices, laboratories, and shops within the Two- Mile Mesa Complex, located at TA-22, TA-6, and TA-40, where work would be consolidated from other locations at LANL. The Proposed Action would also remove or demolish certain vacated structures that are no longer needed. The Proposed Action includes constructing 15 to 25 new structures over a 10-year time frame to replace about 59 structures currently used for DX operations. The NNSA must make a decision whether to consolidate and construct new facilities for the Dynamic Experimentation

122

EA-1948: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

123

EA-1746: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Final Environmental Assessment 6: Final Environmental Assessment EA-1746: Final Environmental Assessment Blue Mountain Geothermal Development Project The geothermal component of the proposed project includes the construction and operation of power generation facilities, geothermal fluid production and injection well pads and wells, access roads, geothermal pipelines, and groundwater production wells.The electrical generation component of the proposed project includes the construction and operation of an electrical transmission line, switching station, and support facilities. The proposed geothermal operations are located on the western slope of Blue Mountain approximately 25 miles west of Winnemucca In Humboldt County, Nevada. Environmental Assessment Blue Mountain Geothermal Development Project,

124

The Savannah River Site (SRS) is located in south-central South Carolina approximately 100 miles from the Atlantic Coast  

NLE Websites -- All DOE Office Websites (Extended Search)

124 124 Revision 0 Tank 18/Tank 19 Special Analysis for the Performance Assessment for the F-Tank Farm at the Savannah River Site February 2012 Prepared by: Savannah River Remediation LLC Closure and Waste Disposal Authority Aiken, SC 29808 Prepared for U.S. Department of Energy Under Contract No. DE-AC09-09SR22505 Tank 18/Tank 19 Special Analysis for the SRR-CWDA-2010-00124 Performance Assessment for the Revision 0 F-Tank Farm at the Savannah River Site February 2012 Page 2 of 132 TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................. 2 LIST OF FIGURES ...................................................................................................................... 4

125

Measurement and inspection of engines operated 50,000 miles on methanol/gasoline blends. Final report No. MED 120, December 1979-December 1980  

DOE Green Energy (OSTI)

The inspection of 6 commercial designed engines which were operated 50,000 miles on 10% methanol/90% unleaded gasoline blend were covered. The program was conducted at the Bartlesville Energy Technology Center, Department of Energy, Bartlesville, Oklahoma with the Mobile Energy Division, Southwest Research Institute providing the technical expertise for the technical inspection of the engines following program completion. These vehicles operated throughout this program with minimal or no operational problems, this report will only indicate engine wear and deposits as determined by standard CRC rating techniques.

Brown, J.G.; Tosh, J.D.

1980-12-01T23:59:59.000Z

126

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

127

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2. Radioactive waste and laundry shipments. Volume 9. Summary status report  

SciTech Connect

This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 to May 5, 1985. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

Doerge, D. H.; Miller, R. L.; Scotti, K. S.

1986-05-01T23:59:59.000Z

128

Microsoft Word - EcoRiskAssessCoverFINAL.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

project area. Although the northeastern corner of Colorado is approximately 28 miles west of the 200-mile-wide Whooping Crane migration corridor, Whooping Cranes are...

129

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

792-S1: Draft Supplemental Environmental Assessment 792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

130

EA-1792-S1: Final Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-S1: Final Supplemental Environmental Assessment 2-S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Final Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792: Draft Environmental Assessment EA-1792-S1: Finding of No Significant Impact

131

EA-1625: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1625: Final Environmental Assessment Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Early Test The Department of Energy proposes to co-fund a project to inject and closely monitor the flow of approximately 1.7 million short tons (1.5 million metric tons) of supercritical carbon dioxide into the brinebearing Tuscaloosa Formation in an area within the lease boundaries of the Cranfield Unit oilfield, about 12 miles (19 kilometers (km)) east of Natchez, Mississippi Final Environmental Assessment Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Early Test, DOE/EA-1625 (March 2009) More Documents & Publications EA-1785: Final Environmental Assessment EA-1846: Final Environmental Assessment

132

EA-1792-S1: Draft Supplemental Environmental Assessment | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Supplemental Environmental Assessment Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment - Appendix A More Documents & Publications EA-1792-S1: Final Supplemental Environmental Assessment

133

EA-0317: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-0317: Final Environmental Assessment EA-0317: Final Environmental Assessment EA-0317: Final Environmental Assessment Remedial Action at the Tuba City Uranium Mill Tailings Site, Tuba City, Arizona This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. Environmental Assessment Remedial Action at the Tuba City Uranium Mill Tailings Site, Tuba City, Arizona, November 1986, DOE/EA-0317 More Documents & Publications CX-010533: Categorical Exclusion Determination LM 12-13 EA-1268: Final Environmental Assessment

134

NANA Geothermal Assessment Program Final Report  

Science Conference Proceedings (OSTI)

In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

Jay Hermanson

2010-06-22T23:59:59.000Z

135

EA-1644: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment Kildeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western's Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. The Pre-Decisional Environmental Assessment was issued, without changes, as the Final Environmental Assessment.

136

EA-1533: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1533: Final Environmental Assessment Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This environmental assessment (EA) provides sufficient evidence and analysis for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) to conclude that potential adverse effects from the upgrade of the distribution system within plant boundaries and the construction of a 10-inch gas main off the plant site for a length of 8.6 miles would be minimal, under normal conditions. Environmental Assessment for the Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas, DOE/EA-1533 (August 2005) More Documents & Publications EA-1533: Finding of No Significant Impact

137

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

138

Three Mile Island Generating Station  

E-Print Network (OSTI)

ii TABLE OF CONTENTS I. Executive Summary................................................................................................................ 1 II. Introduction............................................................................................................................. 3 III. Exercise Overview.............................................................................................................. 6

Technological Hazards Branch

2009-01-01T23:59:59.000Z

139

Preliminary Feasibility Assessment of Geologic Carbon Sequestration Potential for TVA's John Sevier and Kingston Power Plants  

Science Conference Proceedings (OSTI)

This is a preliminary assessment of the potential for geologic carbon sequestration for the Tennessee Valley Authority's (TVA) John Sevier and Kingston power plants. The purpose of this assessment is to make a 'first cut' determination of whether there is sufficient potential for geologic carbon sequestration within 200 miles of the plants for TVA and Oak Ridge National Laboratory (ORNL) to proceed with a joint proposal for a larger project with a strong carbon management element. This assessment does not consider alternative technologies for carbon capture, but assumes the existence of a segregated CO{sub 2} stream suitable for sequestration.

Smith, Ellen D [ORNL; Saulsbury, Bo [ORNL

2008-03-01T23:59:59.000Z

140

EA-1391: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91: Final Environmental Assessment 91: Final Environmental Assessment EA-1391: Final Environmental Assessment Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources In separate actions, Sempra Energy Resources (SER) and Baja California Power, Inc (BCP) have applied to the U.S. Department of Energy for Presidential permits pursuant to Executive Order (EO) 10485, as amended by EO 12038, and 10 CFR section 205.320 et seq. (2000), to construct, operate, maintain, and connect electric power transmission facilities crossing the international border between the United States (U.S.) and Mexico. SER and BCP each propose constructing separate new double-circuit, 230,000 volt (230 kV) transmission lines extending about six miles south from the

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Issues Environmental Assessment on Road Project for Public Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

142

EA-1581: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Draft Environmental Assessment 81: Draft Environmental Assessment EA-1581: Draft Environmental Assessment Sand Hills Wind Energy Facility Albany County, Wyoming WindEnergy, Inc. (SWE or applicant) submitted a request to the U.S. Department of the Interior, Bureau of Land Management (BLM), Rawlins Field Office for a right-of-way (ROW) on BLM-administered lands (Proposed Action). SWE proposes to construct, operate, and maintain the Sand Hills Wind Energy Facility (Facility) in Albany County, Wyoming. The Facility, which would be located approximately 30 miles west of Laramie, would have an aggregate nominal nameplate generating capacity of up to 50 megawatts (MW) of electricity and would include up to 25, 2.0-MW wind turbines.This Environmental Assessment (EA) has been prepared to analyze the

143

EA-1870: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1870: Final Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The U.S. Department of Energy (DOE) prepared this Environmental Assessment (EA) to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, (Viresco) for its construction and operation of a Coal and Biomass Fueled Pilot Plant, that would be located in Kanab, Utah. The plant would be located on land leased to Viresco by the Utah School and Institutional Trust Lands Administration. The Pilot Plant would occupy approximately 1.5 acres of a 10-acre site located approximately 2.5 miles south of the downtown area of Kanab, Utah. EA-1870-FEA-2011c.pdf More Documents & Publications EA-1870: Finding of No Significant Impact

144

EA-1638: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1638: Final Environmental Assessment Loan Guarantee to Solyndra, Inc. for Construction of A Photovoltaic Manufacturing Facility and Leasing of an Existing Commercial Facility in Fremont, California The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee in the amount of $535 million to Solyndra, Inc. (Solyndra) for (1) the construction of a photovoltaic manufacturing facility and accompanying administrative offices in Fremont, California; and (2) the leasing of an existing commercial facility for assembly and packaging of the photovoltaic panels within 25 miles of the proposed manufacturing facility. DOE/EA-1638: Environmental Assessment for the Department of Energy Loan Guarantee to Solyndra, Inc. for Construction of A Photovoltaic

145

EA-1901: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Draft Environmental Assessment 1: Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to support the Kootenai Tribe of Idaho's construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort. EA-1901-DEA-2013.pdf More Documents & Publications EA-1901: Final Environmental Assessment EA-1901: Finding of No Significant Impact EA-1901: Mitigation Action Plan

146

EA-1870: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this Environmental Assessment (EA) to evaluate the potential impacts of providing financial assistance to Viresco Energy, LLC, (Viresco) for its construction and operation of a Coal and Biomass Fueled Pilot Plant, that would be located in Kanab, Utah. The plant would be located on land leased to Viresco by the Utah School and Institutional Trust Lands Administration. The Pilot Plant would occupy approximately 1.5 acres of a 10-acre site located approximately 2.5 miles south of the downtown area of Kanab, Utah. EA-1870-DEA-2011d_0.pdf More Documents & Publications EA-1870: Finding of No Significant Impact

147

EA-1503: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment EA-1503: Final Environmental Assessment Vermont Electric Power Company Proposed Northern Loop Project The Northern Loop Project proposed by VELCO involves upgrades in Vermont at three existing substation1 locations (St. Johnsbury, Irasburg and Highgate), additional line equipment at two tap2 points (Mosher's Tap in Newport and the St. Albans Tap) and an upgrade of an existing 6.47-mile, 48-kilovolt (kV) transmission line, located between VELCO's Irasburg Substation iiand Mosher's Tap, to accommodate a new 115-kV transmission circuit. Environmental Assessment, Vermont Electric Power Company Proposed Northern Loop Project, DOE/EA-1503, 2004 More Documents & Publications EA-1503: Finding of No Significant Impact CX-000605: Categorical Exclusion Determination

148

Environmental impact assessment Geopressure Subprogram  

DOE Green Energy (OSTI)

This environmental impact assessment (EIA) addresses the expected programmatic activities of the Geopressure Subprogram of the Division of Geothermal Energy. The goal of the Geopressure Subprogram is to stimulate development of geopressured resources as an economic, reliable, operationally safe, and environmentally acceptable energy source. The subprogram includes activities in the areas of engineering research and development; resource exploration, assessment, and development; resource utilization including pilot and demonstration facilities; and environmental research and control technology development. It should be recognized that most of the subprogram activities extend over several years and are in their early stages of implementation at this time. The zones of potential geopressure development are in the region located along the Texas and Louisiana Gulf Coasts extending up to 200 miles (300 km) inland. Geopressured zones are sedimentary basins where water is trapped at high pressures within or below thick, nearly impermeable shale sequences. The confined water supports most or all of the weight of the overburden. This inhibits sediment compaction and causes formation pore pressure to exceed hydrostatic pressure. in sedimentary basins that are underlain by thin oceanic crust, upward thermal conduction from the mantle heats geopressured fluids and sediments to abnormally high temperatures, often in excess of 260 C (500 F).

None

1977-07-01T23:59:59.000Z

149

DOE/EIS-0285/SA-133: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Hanford-Ostrander [Mile 126/1-146/4] (3/20/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. Location: The project location is within Skamania County, Washington. The project commences to the west of the White Salmon River and proceeds in a westerly directly for approximately 20 miles. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

150

EA-1366: Preliminary Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

66: Preliminary Environmental Assessment 66: Preliminary Environmental Assessment EA-1366: Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate overloading of the existing line from Santiam Substation to the line's connection to Bethel Substation by having one new line supply Bethel Substation and the other new line supply Chemawa Substation.

151

EA-1372: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1372: Final Environmental Assessment Idaho National Engineering and Environmental Laboratory Wildland Fire Management The Idaho National Engineering and Environmental Laboratory (INEEL) is a U.S. Department of Energy (DOE)-managed reservation occupying about 890 square miles in southeastern Idaho. The INEEL lies within the upper Snake River Plain sagebrush steppe ecosystem. Much of the sagebrush steppe ecosystem throughout the west has been segmented and lost to development and agriculture. The remaining sagebrush steppe ecosystem and the habitat it provides is threatened with irreversible conversion to non-native annual weeds by rangeland management practices in combination with the natural fire process. The sagebrush steppe of the INEEL is now threatened and DOE

152

EA-1354: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1354: Final Environmental Assessment EA-1354: Final Environmental Assessment EA-1354: Final Environmental Assessment Fort Collins 115kV Transmission Line Upgrade Project Platte River is proposing to add additional generation at its Rawhide Energy Station, located approximately 18 miles north of Fort Collins, to serve increasing demands for electricity. In order to deliver the additional power generation to customers, the electric transmission system in the Fort Collins area needs to be upgraded. These upgrades require adding new wires to existing power poles or, in some areas, rebuilding the existing transmission line (see Figure 1-1). The proposed upgrades and rebuilds will be within the rights-of-way (ROW) of existing lines. The ROW width of the existing lines are 75-120 feet. The ROWs for the proposed

153

EA-1665: Final Environmental Assessment and Finding of No Significant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona For more information, contact: Ms. Linette King Desert Southwest Region Western Area Power Administration P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: 602-605-2434 Fax: 602-605-2630 Electronic mail: lking@wapa.gov The Western Area Power Administration (Western) plans to rebuild a 26.2-mile-long portion of the existing Davis-Kingman Tap 69-kilovolt (kV) Transmission Line located in Mohave County,Arizona. The existing Davis-Kingman Tap 69-kV Transmission Line originates in Bullhead City, Arizona, at the Davis Dam Switchyard and extends northwest of Kingman, Arizona, four

154

EA-1747: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Final Environmental Assessment 7: Final Environmental Assessment EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado The RFS is owned by the United States and is located in northern Jefferson County, Colorado, approximately 16 miles northwest of Denver. The RFS was formerly used to process and manufacture nuclear weapons components, but cleanup and closure of Rocky Flats by the U.S. Department of Energy (DOE) was completed in 2005. The Office of Legacy Management (LM) has jurisdiction and control of portions of Rocky Flats. The purpose of the Proposed Action is to reduce or eliminate the retention of surface water to return the RFS surface water flow configuration to the approximate conditions existing prior to construction of the dams.

155

EA-1933: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Final Environmental Assessment 3: Final Environmental Assessment EA-1933: Final Environmental Assessment Yakama Nation Drop 4 Hydropower Project, Yakama Nation Reservation, WA DOE is a cooperating agency with the Department of Interior's Bureau of Indian Affairs as a lead agency for the preparation of an EA to evaluate the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation Department of Natural Resources to install an inline turbine on the Wapato Irrigation Project (WIP) Main Canal to generate approximately one megawatt of supplemental hydroelectric power. The Main Canal is a non-fish bearing irrigation canal within the WIP water conveyance system. The project site is located two miles southwest of Harrah, Washington. EA-1933-FEA-2012.pdf

156

EA-1855: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOE/EA-4406) This EA evaluates the potential environmental impacts of a proposal to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The EA Revision Sheet combined with the Preliminary EA constitutes the final EA. The final EA includes a Floodplain Statement of Findings and a Mitigation Action Plan that outlines the mitigation measures that will be implemented during and after construction. Construction begins in mid May, 2012 and will be completed in the winter of 2012.

157

EA-1764: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Final Environmental Assessment 4: Final Environmental Assessment EA-1764: Final Environmental Assessment Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE) Marcell Experimental Forest, Itasca County, Minnesota DOE and the U.S. Forest Service (USFS) propose to collaborate in research on the response and effects of elevated temperature and elevated atmospheric carbon dioxide (CO2) on a black spruce-Sphagnum (peatmoss) ecosystem located in the Marcell Experimental Forest (MEF), which is located approximately 25 miles north of Grand Rapids, in Itasca County, Minnesota. The purpose of the proposed research is to obtain information on how this ecosystem would respond to a range of higher temperatures and increased atmospheric CO2 that may occur in the future. Because this

158

EA-1890: Final Environmental Assessment (Adopted) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment (Adopted) Final Environmental Assessment (Adopted) EA-1890: Final Environmental Assessment (Adopted) Hydropower License, Reedsport OPT Wave Park Project-FERC Project No. 12713-002 On February 1, 2010, Reedsport OPT Wave Park, LLC (OPT) filed an application for an original license to construct and operate the Reedsport OPT Wave Park Project (Reedsport Project or project). The 1.5-megawatt (MW) project would include 10 wave energy conversion devices moored in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. The onshore portion of the project, also located in Douglas County, would occupy about 5 acres of federal lands administered by the U.S. Department of Agriculture, Forest Service (Forest Service). The project would generate an average of about 4,140

159

EA-1759: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1759: Final Environmental Assessment EA-1759: Final Environmental Assessment EA-1759: Final Environmental Assessment Southwest Alaska Regional Geothermal Energy Project Naknek, Alaska The U.S. Department of Energy (DOE) is proposing an action (the Proposed Action) to fund the construction, operation, drilling, well logging, completion, installation of a seismic monitoring network, and testing of two of the exploratory geothermal wells (G2 and G3) and stimulation of one well (G1, G2, or G3), if feasible, on a 49-hectare (120-acre) parcel of land in southwest Alaska. The Naknek Electric Association (NEA) owned land is approximately 8 kilometers (km) (5 miles [mi]) northeast of King Salmon (Figure 1.0-1). Existing infrastructure includes a gravel road to the project area, two gravel pads connected by a gravel road, and a single

160

EA-1954: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

4: Draft Environmental Assessment 4: Draft Environmental Assessment EA-1954: Draft Environmental Assessment Resumption of Transient Testing of Nuclear Fuels and Materials at the Idaho National Laboratory, Idaho This EA evaluates the potential environmental impacts associated with DOE's proposed action to resume transient testing at INL's Transient Reactor Test Facility reactor approximately 38 miles west of Idaho Falls, Idaho or to start transient testing at SNL's Annular Core Research Reactor in Albuquerque, New Mexico. The draft EA identifies INL as the preferred location and describes DOE's reasons for identifying INL as the preferred location. EA-1954-DEA-2013.pdf More Documents & Publications EIS-0281: Draft Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ARAC: A flexible real-time dose consequence assessment system  

Science Conference Proceedings (OSTI)

Since its beginning, the Atmospheric Release Advisory Capability (ARAC), an emergency radiological dose assessment service of the US Government, has been called on to do consequence assessments for releases into the atmosphere of radionuclides and a variety of other substances. Some of the more noteworthy emergency responses have been for the Three Mile Island and Chernobyl nuclear power reactor accidents, and more recently, for a cloud of gases from a rail-car spill into the Sacramento river of the herbicide metam sodium, smoke from hundreds of burning oil wells in Kuwait, and ash clouds from the eruption of Mt. Pinatubo. The spatial scales of these responses range from local, to regional, to global, and the response periods from hours, to weeks, to months. Because of the variety of requirements of each unique assessment, ARAC has developed and maintains a flexible system of people, computer software and hardware.

Ellis, J.S.; Sullivan, T.J.

1993-10-07T23:59:59.000Z

162

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

163

Economic Assessment of a Conceptual Biomass to Liquids Bio-Syntrolysis Plant  

SciTech Connect

A series of assessments evaluated the economic efficiency of integrating a nuclear electric power plant with a biomass to SynFuel plant under three market scenarios. Results strongly suggest that a nuclear assisted-BioSyntrolysis Process would be as cost competitive as other carbon feedstock to liquid fuels concepts while having significant advantages regarding CO2 greenhouse gas production. This concept may also be competitive for those energy markets where energy dense, fossil fuels are scarce while wind, hydroelectric, or other renewable energy sources can be produced at a relatively low cost. At this time, a realistic vision of this technologys deployment of a biomass to synfuel plants powered by a nuclear 1100 MWe reactor. Accompanying an area of 25 miles by 25 miles, this integrated Enterprise could produce 24,000 BBLs of SynFuel daily; or 0.2% of the U.S.s imported oil.

M. M. Plum; G. L. Hawkes

2010-06-01T23:59:59.000Z

164

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

165

Materials - Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Assessment The staff of the Energy Systems Division has a long history of technical and economic analysis of the production and recycling of materials for transportation...

166

"1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana" Louisiana" "1. Nine Mile Point","Gas","Entergy Louisiana Inc",1756 "2. Willow Glen","Gas","Entergy Gulf States Louisiana LLC",1752 "3. Big Cajun 2","Coal","Louisiana Generating LLC",1743 "4. Brame Energy Center","Coal","Cleco Power LLC",1423 "5. R S Nelson","Coal","Entergy Gulf States Louisiana LLC",1366 "6. Little Gypsy","Gas","Entergy Louisiana Inc",1170 "7. Waterford 3","Nuclear","Entergy Louisiana Inc",1168 "8. Acadia Energy Center","Gas","Acadia Power Partners",1063 "9. River Bend","Nuclear","Entergy Gulf States Louisiana LLC",974

167

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

168

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

169

RADIOLOGICAL ASSESSMENT  

Office of Legacy Management (LM)

ASSESSMENT ASSESSMENT and STABILIZATION' SCENARIOS PARRERSBURG,'W. VA. SITE FEBRUARY 1980 M. CARSON J. COFFMAN N. MANDELTORT, ! Division of Nuclear Service Operations Chem-Nuclear\ Systems, Inc. 240 Stoneridge Dr., Suite 100 Columbia, South Carolina 29210 Prepared for AMAX Specialty Hetals Corporation One Greenwich Plaza Greenwich, Connecticut 06830 During July' 1978, Chem-Nuclear Systems, Inc. (CNSI) began an assessment program for AMAX Specialty Metals Corp."(AMAX) u to locate, quantify, and evaluate the'extent of environmental radioactive contamination at the AMAX Parkersburg., West Virginia former zirconium/hafnium processing facility. In addition, preliminary ive assessments were to be made to assist AMAX in evaluat ,ing alternat methods for site cleanup.

170

Boundary-Spokane/Colville Valley Support Project : Environmental Assessment.  

SciTech Connect

Systems studies conducted by Bonneville Power Administration indicate a need to reinforce the existing transmission system in the Colville Valley area of Washington. Analysis of several options concluded that the optimal solution for reliability and transmission loss concerns, to serve load growth, and to integrate new power generation projects was to increase transmission voltage capacity between Half Moon Substation and Boundary Substation. The Boundary-Spokane/Colville Valley Support Project is a plan to accomplish this. The project involves rebuilding an existing 91-mile single-circuit 115-kV line between Half Moon Substation and Metaline Falls to double-circuit 230-kV configuration, and adding a single-circuit 230-kV line between Metaline Falls and Boundary Substation, a distance of 9 miles. A route option and a tower design option are being evaluated for selected sections of the proposed route. The proposed action, including route and tower design options, is evaluated in this document. This evaluation includes assessments of the level of environmental impacts and impact ratings, and a comparison of options. In addition, the advantages and disadvantages of the delay/no-action and conservation alternatives are evaluated and compared to the consequences of the proposed action. Alternatives to the proposed action are described. 6 figs., 10 tabs.

United States. Bonneville Power Administration.

1983-06-01T23:59:59.000Z

171

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

172

Rapid Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment Assessment of Lignin Content and Structure in Switchgrass (Panicum virgatum L.) Grown Under Different Environmental Conditions David G. J. Mann & Nicole Labbé & Robert W. Sykes & Kristen Gracom & Lindsey Kline & Isabella M. Swamidoss & Jason N. Burris & Mark Davis & C. Neal Stewart Jr. Published online: 13 October 2009 # Springer Science + Business Media, LLC. 2009 Abstract Switchgrass (Panicum virgatum L.) is a candi- date feedstock in bioenergy, and plant breeding and molecular genetic strategies are being used to improve germplasm. In order to assess these subsequent modifica- tions, baseline biomass compositional data are needed in a relevant variety of environments. In this study, switch- grass cv. Alamo was grown in the field, greenhouse, and growth chamber and harvested into individual leaf and stem tissue components. These components

173

Sleep Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Sleep Assessment Sleep Assessment 1 | Thank you for taking the time to complete this extensive form. Sleep disturbances and/or fatigue are most often the result of many factors. In order to best treat your condition we need to understand your symptoms and history. Please bring your completed assessment form to your appointment. To schedule an appointment please call 505 844-HBES (4237). Name: Employee ID#: Date: Male Female Age: Health Plan : United BCBSNM Other: Referred by: Sleep and Health History In general, would you describe your sleep as: Refreshing Not Refreshing How would you rate your sleep? Very Good Good Adequate Poor Very Poor How would you describe your sleep problem? Sleep Problem (indicate all that apply) Duration of problem

174

Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

175

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

176

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

177

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

178

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

179

Demonstrate Ames Laboratory capability in Probabilistic Risk Assessment (PRA)  

Science Conference Proceedings (OSTI)

In response to the damage which occurred during the Three Mile Island nuclear accident, the Nuclear Regulatory Commission (NRC) has implemented a Probabilistic Risk Assessment (PRA) program to evaluate the safety of nuclear power facilities during events with a low probability of occurrence. The PRA can be defined as a mathematical technique to identify and rank the importance of event sequences that can lead to a severe nuclear accident. Another PRA application is the evaluation of nuclear containment buildings due to earthquakes. In order to perform a seismic PRA, the two conditional probabilities of ground motion and of structural failure of the different components given a specific earthquake are first studied. The first of these is termed probability of exceedance and the second as seismic fragility analysis. The seismic fragility analysis is then related to the ground motion measured in terms of ``g`` to obtain a plant level fragility curve.

Bluhm, D.; Greimann, L.; Fanous, F.; Challa, R.; Gupta, S.

1993-07-01T23:59:59.000Z

180

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon (December 2010)

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

NREL GIS Data: Wave Energy Assessment for the United States and Puerto Rico  

Open Energy Info (EERE)

Wave Energy Assessment for the United States and Puerto Rico Wave Energy Assessment for the United States and Puerto Rico Dataset Summary Description Source The Wave Energy Resource Assessment project is a joint venture between NREL, EPRI, and Virginia Tech. EPRI is the prime contractor, Virginia Tech is responsible for development of the models and estimating the wave resource, and NREL serves as an independent validator and also develops the final GIS-based display of the data. Geographic Range US coastline, including AK, HI and Puerto Rico, out to 50 nautical miles. Grid Properties Grids are derived from WaveWatch III grids. Near the coast of the lower 48 and HI, grids are squares, 4 minutes by 4 minutes (15 per degree). For the Alaska grids AK and BS, the grid is 4 minutes of latitude by 8 minutes of longitude (15 per deg by 7.5 per deg).

182

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1890: DOE Notice of Availability of the Draft Environmental EA-1890: DOE Notice of Availability of the Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave

183

Risk management & organizational uncertainty implications for the assessment of high consequence organizations  

SciTech Connect

Post hoc analyses have demonstrated clearly that macro-system, organizational processes have played important roles in such major catastrophes as Three Mile Island, Bhopal, Exxon Valdez, Chernobyl, and Piper Alpha. How can managers of such high-consequence organizations as nuclear power plants and nuclear explosives handling facilities be sure that similar macro-system processes are not operating in their plants? To date, macro-system effects have not been integrated into risk assessments. Part of the reason for not using macro-system analyses to assess risk may be the impression that standard organizational measurement tools do not provide hard data that can be managed effectively. In this paper, I argue that organizational dimensions, like those in ISO 9000, can be quantified and integrated into standard risk assessments.

Bennett, C.T.

1995-02-23T23:59:59.000Z

184

NANA Wind Resource Assessment Program Final Report  

DOE Green Energy (OSTI)

NANA Regional Corporation (NRC) of northwest Alaska is located in an area with abundant wind energy resources. In 2007, NRC was awarded grant DE-FG36-07GO17076 by the US Department of Energy's Tribal Energy Program for funding a Wind Resource Assessment Project (WRAP) for the NANA region. The NANA region, including Kotzebue Electric Association (KEA) and Alaska Village Electric Cooperative (AVEC) have been national leaders at developing, designing, building, and operating wind-diesel hybrid systems in Kotzebue (starting in 1996) and Selawik (2002). Promising sites for the development of new wind energy projects in the region have been identified by the WRAP, including Buckland, Deering, and the Kivalina/Red Dog Mine Port Area. Ambler, Shungnak, Kobuk, Kiana, Noorvik & Noatak were determined to have poor wind resources at sites in or very near each community. However, all five of these communities may have better wind resources atop hills or at sites with slightly higher elevations several miles away.

Jay Hermanson

2010-09-23T23:59:59.000Z

185

Environmental Assessment for the Terminal Expansion Project.  

SciTech Connect

The Terminal Expansion Project is proposed by Bonneville Power Administration (BPA), Southern California Edison (SCE), and the Los Angeles Department of Water and Power (LADWP) to increase the operating capacity of the existing bipole direct current (dc) Intertie line between the Celilo Converter Station at The Dalles, Oregon, and the Sylmar converter Station at Sylmar, California. The proposal will allow a greater exchange of electric power between the Pacific Northwest (PNW) and Southern California without constructing new interregional transmission lines. By adding more alternating ac/dc converter equipment at the terminals, the conductors on the existing 845-mile dc intertie transmission line can be operated at full design capacity. The dc Intertie plus two other ac lines which terminate near San Francisco comprise the ''Intertie.'' Though the project is interregional, relatively little construction will be needed. This Environmental Assessment addresses the environmental impacts of the proposed actions and makes a determination as to their significance. Though LADWP is complying with the State environmental process, as required by the California Environmental Quality Act (CEQA), the impacts of their construction are being considered as part of the impacts of the overall proposal and are considered in the determination of significance.

United States. Bonneville Power Administration.

1985-02-01T23:59:59.000Z

186

Environmental assessment for Kelley Hot Spring geothermal project: Kelley Hot Spring Agricultural Center  

DOE Green Energy (OSTI)

The environmental impacts of an integrated swine production unit are analyzed together with necessary ancillary operations deriving its primary energy from a known geothermal reservoir in accordance with policies established by the National Energy Conservation Act. This environmental assessment covers 6 areas designated as potentially feasible project sites, using as the basic criteria for selection ground, surface and geothermal water supplies. The six areas, comprising +- 150 acres each, are within a 2 mile radius of Kelley Hot Springs, a known geothermal resource of many centuries standing, located 16 miles west of Alturas, the county seat of Modoc County, California. The project consists of the construction and operation of a 1360 sow confined pork production complex expandable to 5440 sows. The farrow to finish system for 1360 sows consists of 2 breeding barns, 2 gestation barns, 1 farrowing and 1 nursery barn, 3 growing and 3 finishing barns, a feed mill, a methane generator for waste disposal and water storage ponds. Supporting this are one geothermal well and 1 or 2 cold water wells, all occupying approximately 12 acres. Environmental reconnaissance involving geology, hydrology, soils, vegetation, fauna, air and water quality, socioeconomic, archaelogical and historical, and land use aspects were carefully carried out, impacts assessed and mitigations evaluated.

Neilson, J.A.

1981-04-01T23:59:59.000Z

187

Environmental Assessment for Conducting Astrophysics and Other...  

NLE Websites -- All DOE Office Websites (Extended Search)

(5-mile-) wide valley open to the southwest located to the west of the Waste Isolation Pilot Plant site. National Environmental Policy Act The act designed to promote inclusion...

188

6 - Appendix B - Miles Data.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

0 34 2.4 12 20 480 48 432 0 2909 6.7 13 20 460 0 460 0 4820 10.5 2002 01 20 480 0 480 0 4560 9.5 02 20 460 0 460 0 4462 9.7 03 20 440 60 380 0 4059 10.7 04 20 460 60 400 0 5045...

189

Per-Mile Premiums for Auto Insurance  

E-Print Network (OSTI)

Social Cost of Motor-vehicle Use In the United States, Based on 1990-1991, June 1997, Institute of Transportation

Edlin, Aaron S.

2002-01-01T23:59:59.000Z

190

Taking the tire the final mile  

Science Conference Proceedings (OSTI)

In 1990 the Scott County Health Department formed a local Waste Tire Task Force to address the growing problem of illegally dumped tires in Scott County, Iowa. Strategies developed by the task force included providing convenient, low cost disposal; increasing public awareness; and promoting participation in recycling efforts. The task force has held several free waste tire collections, including Waste Tire Amnesty Days and an Earth Week event. At the recommendation of the task force, regular tire disposal fees at the Scott County Landfill, operated by the Scott Area Solid Waste Management Commission, were also reduced. Through the task force efforts, 107,000 waste tires, including several stockpiles, have been recovered in Scott County. Many were recycled, some at a local cement plant, which used them as fuel for a test burn. Complaints to the health department regarding accumulations of waste tires have decreased. The commitment to managing waste tires in Scott County is ongoing; the most recent free, tire disposal day was held in May 1994.

Moore, G.A. [Scott County Health Dept., Davenport, IA (United States); Wuestenberg, T.; Hall, J.

1995-07-01T23:59:59.000Z

191

Vehicle-Miles Traveled - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Return to: Transportation Channel . NOTE: To view and/or print files in PDF format, Adobe Acrobat Reader is required.

192

A GEM Award (Going the Extra Mile)  

Energy.gov (U.S. Department of Energy (DOE))

All Headquarters Department of Energy Employees except Political Appointees (including Schedule C and non-career members of the SES). Any Employee may nominate another employee for this award.

193

0 10 Miles5 10 Kilometers5  

E-Print Network (OSTI)

Flathead River Fish Creek McGee Creek Dutch Creek Anaconda Creek Mineral Creek McDonald Creek Sprague Creek

194

0 1 2 Miles 2 Kilometers  

E-Print Network (OSTI)

VALLEY FLINT RIDGE East Entranc e Road M AM M O TH CAVE RIDGE Flint Ridge Road ParkRi dge Road R Hunter

195

EA-1050: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineering Laboratory's proposal to remove 344 canisters of Three Mile Island core debris and commercial fuels from the Test Area North Pool and transfer them to the Idaho...

196

Fort Stewart integrated resource assessment. Volume 1, Executive summary  

SciTech Connect

The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.

Larson, L.L.; Keller, J.M.

1993-10-01T23:59:59.000Z

197

EA-1971: FERC Notice of Intent to Prepare an Environmental Assessment |  

NLE Websites -- All DOE Office Websites (Extended Search)

71: FERC Notice of Intent to Prepare an Environmental 71: FERC Notice of Intent to Prepare an Environmental Assessment EA-1971: FERC Notice of Intent to Prepare an Environmental Assessment Golden Pass LNG Export and Pipeline Project, Texas and Louisiana The Federal Energy Regulatory Commission (FERC) announces its intent to prepare, with DOE as a cooperating agency, an EA to analyze the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in Jefferson County, Texas. The proposal includes approximately 8 miles of pipeline connecting to existing pipelines in Calcasieu Parish, Louisiana, and Jefferson County. EA-1971-NOI-2013.pdf More Documents & Publications EIS-0497: FERC Notice of Intent to Prepare an Environmental Impact

198

Robins Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect

The US Air Force Materiel Command (AFMC) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Robins Air Force Base (AFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the AFMC Robins AFB facility located approximately 15 miles south of Macon, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 13 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative-description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

199

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

200

Integrated Environmental Assessment Part III: Exposure Assessment  

E-Print Network (OSTI)

of an Official ISEA Glossary, Journal of Exposure AnalysisGeneva. IPCS (2001) Glossary of Exposure Assessment-Related

McKone, Thomas E.; Small, Mitchell J.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho. Final  

SciTech Connect

This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site.

Not Available

1991-01-01T23:59:59.000Z

202

Solar radiation resource assessment  

DOE Green Energy (OSTI)

The bulletin discusses the following: introduction; Why is solar radiation resource assessment important Understanding the basics; the solar radiation resource assessment project; and future activities.

Not Available

1990-11-01T23:59:59.000Z

203

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

204

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

205

Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project  

SciTech Connect

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

1989-09-01T23:59:59.000Z

206

Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota. [UMTRA Project  

SciTech Connect

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs.

Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

1989-09-01T23:59:59.000Z

207

LUser_CompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competency Assessments (Employee) Competency Assessments (Employee) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Participating in Competency Assessments (Employee) Purpose The purpose of this job aid is to guide users and supervisors through the step-by-step process of participating in a competency assessment by viewing gaps, assigning items, conducting a self- assessment, reviewing completed assessments, and viewing the competency history. View Gaps and Assign Items 6 Steps Task A Employee: Conduct Self Assessment 8 Steps Task B Employee: Review Completed Assessment - 6 Steps Task C Employee: View Competency History 11 Steps Task D SuccessFactors Learning v 6.4 User Job Aid Participating in Competency Assessments (Employee)

208

The results of an ecological risk assessment screening at the Idaho National Engineering`s waste area group 2  

SciTech Connect

The Idaho National Engineering Laboratory (INEL) is a Department of Energy (DOE) facility located in southeastern Idaho and occupies approximately 890 square miles on the northwestern portion of the eastern Snake River Plain. INEL has been devoted to nuclear energy research and related activities since its establishment in 1949. In the process of fulfilling this mission, wastes were generated, including radioactive and hazardous materials. Most materials were effectively stored or disposed of, however, some release of contaminants to the environment has occurred. For this reason, the INEL was listed by the US environmental Protection Agency on the National Priorities List (NPL), in November, 1989. This report describes the results of an ecological risk assessment performed for the Waste Area Groups 2 (WAG 2) at the INEL. It also summarizes the performance of screening level ecological risk assessments (SLERA).

VanHorn, R.

1995-11-01T23:59:59.000Z

209

Assessment of phosphoric acid and trifluoromethane sulfonic acid fuel cells for vehicular powerplants  

SciTech Connect

The application of phosphoric acid and trifluoromethane sulfonic acid fuel cell powerplants for a basic mid-size automobile (i.e. GM-X type car) has been assessed. A parametric analysis was conducted to examine the effects of various system parameters such as operating temperature and pressure, current density and catalyst loading on system efficiency (miles/gallon) and cost. A system schematic and a list of design specifications were prepared to guide the conceptual design. Weight, volume and peak power of both the powerplants were estimated. The two fuel conditioning methods-conventional steam reforming and partial oxidation/ reforming were evaluated. Both the fuel cell systems were found to possess great potential for the transportation application.

Patel, D.N.; Leo, A.; Tobias, L.

1982-08-01T23:59:59.000Z

210

Low Head/Low Power Hydropower Resource Assessment of the Pacific Northwest Hydrologic Region  

E-Print Network (OSTI)

An analytical assessment of the hydropower potential of the Pacific Northwest Hydrologic Region was performed using state-of-the-art digital elevation models and geographic information system tools. The principal focus of the study was the amount of low head (less than 30 ft)/low power (less than 1 MW) potential in the region and the fractions of this potential that corresponded to the operating envelopes of three classes of hydropower technologies: conventional turbines, unconventional systems, and microhydro (less than 100 kW) technologies. To obtain these estimates, the hydropower potential of all the stream segments in the region, which averaged 2 miles in length, were calculated. These calculations were performed using hydrography and hydraulic heads that were obtained from the U.S. Geological Surveys Elevation Derivatives for National Applications dataset and stream flow predictions from a regression equation developed specifically for the region. Stream segments excluded from development and developed hydropower in the

Power Hydropower; Douglas G. Hall; Gregory R. Carroll; Shane J. Cherry; Y D. Lee; Garold L. Sommers

2002-01-01T23:59:59.000Z

211

Solar Resource Assessment  

DOE Green Energy (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

212

Substation Site Assessment  

Science Conference Proceedings (OSTI)

Companies assess environmental conditions at their facilities as part of routine operations and in preparation of property transfers. This report and template provide a simple, efficient guide for assessing substation facilities.

2001-02-09T23:59:59.000Z

213

Updated Operations Assessment Guideline  

Science Conference Proceedings (OSTI)

The Operations Assessment Guideline (OAG) can be used to assess the organization and processes of operations departments. An internal utility team or third party can use this report to guide a team composed of industry experts and members of the assessed utility. This report is an update to EPRI report 1008520, Operations Assessment Guideline, published in March 2005. This improved version includes insights gained after three years of experience with the original report.

2008-03-25T23:59:59.000Z

214

Strategic petroleum reserve seaway complex distribution enhancements, Brazoria, Galveston and Harris Counties, Texas. Revised environmental assessment  

Science Conference Proceedings (OSTI)

The Strategic Petroleum Reserve (SPR) of the US Department of Energy (DOE) proposes to construct and operate a 40-inch diameter, 46-mile long buried crude oil pipeline from existing facilities of the SPR Seaway Complex located near Freeport, Texas, to an existing commercial crude oil terminal near Texas City, Texas. In May 1984, DOE issued an Environmental Assessment ((EA); DOE/EA-0252) and a Finding of No Significant Impact for this action. The May 1985 EA addressed the construction and operation of a DOE-owned buried crude oil pipeline from Bryan Mound to the ARCO Terminal located in Texas City, Galveston County, Texas. The EA assessed three alternative alignments for outing the pipeline from Bryan Mound past Freeport to a common point near Stratton Ridge. From Stratton Ridge to Texas City, one route segment was considered. All three alternative alignments around Freeport were subsequently determined to be unsuitable for safe construction of a large-diameter buried pipeline, primarily because of crowded pipeline corridors and restricted pipeline rights-of-way (ROW). Therefore, the SPR identified and is herein considering a fourth alternative route segment from Bryan Mound through the City of Freeport, across the Old Brazos River and Dow Barge Canal, and northward to Stratton Ridge. The route is about 11 miles long, and is in or adjacent to existing utility and pipeline right-of-way for about 70% of its length. Crude oil throughput capacity for all cases is 1.10 million barrels per day. This revised EA addresses environmental impacts of construction and operation of the pipeline along the fourth subalternative route segment, as compared to impacts from the three previously considered alternative route segments. 11 refs., 3 figs., 1 tab.

Not Available

1986-02-01T23:59:59.000Z

215

Software project effort assessment  

Science Conference Proceedings (OSTI)

Software project assessments and postmortem analyses can increase the success of future projects and forthcoming project phases. However, although assessments and analyses are well-presented in the software engineering literature, they are short of descriptions ... Keywords: assessment, effort, final report, postmortem, project management, retrospective

Topi Haapio; Anne Eerola

2010-12-01T23:59:59.000Z

216

East Grangeville Substation : Environmental Assessment.  

SciTech Connect

BPA proposes to build a 6/8 MVA, 115/13.8-kV substation about 0.7 mile (1.2 km) east of Grangeville, Idaho. BPA's substation yard would comprise an area of 70 by 72 feet (21 by 22 m) containing a 115/13.8-kV transformer. Energization for the substation is scheduled for September 1983. In connected actions the Co-op would build a 13.8-kV switching station and a 13.8/34.5-kV step-up station. The Co-op would require an area of 100 by 55 feet (31 by 17 m) in addition to the BPA yard. The total area needed for the combined BPA/Co-op substation would be approximately 170 by 127 feet (52 by 40 m) or one-half of an acre (0.20 ha). The Co-op would also build two 13.8-kV feeders and one 34.5-kV feeder underground south of the substation to overhead distribution lines along State Highway 13 with space for one future feeder. Another 13.8-kV feeder would exit the substation underground and loop around to the north to reconnect to the existing 13.8-kV overhead line. TWWP would build a tapline from their Grangeville-Kamiah-Nez Perce (Grangeville-Nez Perce No. 2) 115-kV transmission line to the substation. This line would be approximately 0.75 mile (1.2 km) long and would consist of single wood pole structures built on the route of an existing Co-op distribution line. The new and existing lines would use the same poles. A temporary access road would be built for 0.25 mile (0.4 km). The remaining 0.5 mile (0.8 km) section would be adjacent to a county road and would not require an access road. Two sites were identified as meeting the technical requirements. Site 2 is recommended.

United States. Bonneville Power Administration.

1983-03-01T23:59:59.000Z

217

Vandenberg Air Force Base integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect

The US Air Force Space Command (SPACECOM) has tasked the Pacific Northwest Laboratory (PNL), as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the SPACECOM VAFB facility located approximately 50 miles northwest of Santa Barbara, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analysis of EROs are presented in ten common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). In addition, a case study of process loads at Space Launch Complex-4 (SLC-4) is included. A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings; impacts on operation and maintenance (O and M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and value index (VI) of each ERO. Finally, an appendix includes a summary of an economic analysis case study of the South Vandenberg Power Plant (SVPP) operating scenarios.

Daellenbach, K.K.; Dagle, J.E.; Dittmer, A.L.; Elliott, D.B.; Halverson, M.A.; Hickman, B.J.; Parker, G.B.; Richman, E.E.; Shankle, S.A.

1993-06-01T23:59:59.000Z

218

Cape Canaveral Air Force Station integrated resource assessment. Volume 3, Resource assessment  

Science Conference Proceedings (OSTI)

The U.S. Air Force (USAF) has tasked the Pacific Northwest Laboratory (PNL) in support of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Cape Canaveral Air Force Station (AFS). Projects considered can be either in the form of energy management or energy conservation. The overall efforts of this task are based on a model program PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at Cape Canaveral AFS, which is located approximately 10 miles north of Cocoa Beach, Florida. It is a companion report to Volume 1: Executive Summary and Volume 2: Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, including information on the installed cost, energy and dollar savings, impacts on operations and maintenance (O&M), and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. Descriptions of the evaluation methodologies and technical and cost assumptions are also provided for each ERO. Summary tables present the cost- effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis, indicating the net present value (NPV) and savings-to-investment ratio (SIR) of each ERO.

Sandusky, W.F.; Eichman, C.J.; King, D.A.; McMordie, K.L.; Parker, S.A.; Shankle, S.A.; Wahlstrom, R.R.

1994-03-01T23:59:59.000Z

219

Environmental Assessment: geothermal direct heat project, Marlin, Texas  

DOE Green Energy (OSTI)

The Federal action addressed by this Environmental Assessment (EA) is joint funding the retrofitting of a heating and hot water system in a hospital at Marlin, Texas, with a geothermal preheat system. The project will be located within the existing hospital boiler room. One supply well was drilled in an existing adjacent parking lot. It was necessary to drill the well prior to completion of this environmental assessment in order to confirm the reservoir and to obtain fluids for analysis in order to assess the environmental effects of fluid disposal. Fluid from operation will be disposed of by discharging it directly into existing street drains, which will carry the fluid to Park Lake and eventually the Brazos River. Fluid disposal activities are regulated by the Texas Railroad Commission. The local geology is determined by past displacements in the East Texas Basin. Boundaries are marked by the Balcones and the Mexia-Talco fault systems. All important water-bearing formations are in the cretaceous sedimentary rocks and are slightly to highly saline. Geothermal fluids are produced from the Trinity Group; they range from approximately 3600 to 4000 ppM TDS. Temperatures are expected to be above 64/sup 0/C (147/sup 0/F). Surface water flows southeastward as a part of the Brazos River Basin. The nearest perennial stream is the Brazos River 5.6 km (3.5 miles) away, to which surface fluids will eventually discharge. Environmental impacts of construction were small because of the existing structures and paved areas. Construction run-off and geothermal flow-test fluid passed through a small pond in the city park, lowering its water quality, at least temporarily. Construction noise was not out of character with existing noises around the hospital.

Not Available

1980-08-01T23:59:59.000Z

220

Philosophy on Vulnerability Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

capabilities/vat/assess/ capabilities/vat/assess/ ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, 9700 South Cass Ave., Argonne, IL Philosophy on Vulnerability Assessments Argonne Vulnerability Assessment Team Roger G. Johnston, Ph.D., CPP , 630-252-6168 1. There are a number of conventional tools for finding security vulnerabilities. These include security surveys, risk management, design basis threat, CARVER Method, Delphi Method, software vulnerability assessment tools, infrastructure modeling, etc. 2. These tools have some value, and indeed we have used them all. 3. Experience has shown, however, that these methods do not usually result in dramatic improvements to security, nor do they reliably predict catastrophic security incidents that

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

System Assessment Standards: Defining the Market for Industrial Energy Assessments  

E-Print Network (OSTI)

2008. System Assessment Standards: Defining the Market forL ABORATORY System Assessment Standards: Defining the Marketemployer. System Assessment Standards: Defining the Market

Sheaffer, Paul

2010-01-01T23:59:59.000Z

222

Wind resource assessment: San Nicolas Island, California  

DOE Green Energy (OSTI)

San Nicolas Island (SNI) is the site of the Navy Range Instrumentation Test Site which relies on an isolated diesel-powered grid for its energy needs. The island is located in the Pacific Ocean 85 miles southwest of Los Angeles, California and 65 miles south of the Naval Air Weapons Station (NAWS), Point Mugu, California. SNI is situated on the continental shelf at latitude N33{degree}14` and longitude W119{degree}27`. It is approximately 9 miles long and 3.6 miles wide and encompasses an area of 13,370 acres of land owned by the Navy in fee title. Winds on San Nicolas are prevailingly northwest and are strong most of the year. The average wind speed is 7.2 m/s (14 knots) and seasonal variation is small. The windiest months, March through July, have wind speeds averaging 8.2 m/s (16 knots). The least windy months, August through February, have wind speeds averaging 6.2 m/s (12 knots).

McKenna, E. [National Renewable Energy Lab., Golden, CO (United States); Olsen, T.L. [Timothy L. Olsen Consulting, (United States)

1996-01-01T23:59:59.000Z

223

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Technical Memorandum , Part II. Screening Level Risk Assessment 92-225-161-49 K-33 Cooling Towers screening risk assessments (2) K-770 sites screening risk assessment (9...

224

Industrial Assessment Center  

SciTech Connect

The University of Dayton (UD) performed energy assessments, trained students and supported USDOE objectives. In particular, the UD Industrial Assessment Center (IAC) performed 96 industrial energy assessment days for mid-sized manufacturers. The average identified and implemented savings on each assessment were $261,080 per year and $54,790 per year. The assessments served as direct training in industrial energy efficiency for 16 UD IAC students. The assessments also served as a mechanism for the UD IAC to understand manufacturing energy use and improve upon the science of manufacturing energy efficiency. Specific research results were published in 16 conference proceedings and journals, disseminated in 22 additional invited lectures, and shared with the industrial energy community through the UD IAC website.

J. Kelly Kissock; Becky Blust

2007-04-17T23:59:59.000Z

225

Geothermal reservoir assessment case study: Northern Dixie Valley, Nevada  

DOE Green Energy (OSTI)

Two 1500 foot temperature gradient holes and two deep exploratory wells were drilled and tested. Hydrologic-hydrochemical, shallow temperature survey, structural-tectonic, petrologic alteration, and solid-sample geochemistry studies were completed. Eighteen miles of high resolution reflection seismic data were gathered over the area. The study indicates that a geothermal regime with temperatures greater than 400/sup 0/F may exist at a depth of approximately 7500' to 10,000' over an area more than ten miles in length.

Denton, J.M.; Bell, E.J.; Jodry, R.L.

1980-11-01T23:59:59.000Z

226

INDUSTRIAL ASSESSMENT CENTER PROGRAM  

Science Conference Proceedings (OSTI)

Since its establishment in 1990, San Diego State Universitys Industrial Assessment Center (IAC) has served close to 400 small and medium-sized manufacturing plants in Southern California. SDSU/IACs efforts to transfer state-of-the-art technologies to industry have increased revenues, cultivated creativity, improved efficiencies, and benefited the environment. A substantial benefit from the program has been the ongoing training of engineering faculty and students. During this funding cycle, SDSU/IAC has trained 31 students, 7 of the graduate. A total of 92 assessments and 108 assessment days were completed, resulting in 638 assessment recommendations.

ASFAW BEYENE

2008-09-29T23:59:59.000Z

227

Industrial Energy Efficiency Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Energy Efficiency Assessments Lynn Price Staff Scientist China Energy Group Energy Analysis Department Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Industrial Energy Efficiency Assessments - Definition and overview of key components - International experience - Chinese situation and recommendations - US-China collaboration Industrial Energy Efficiency Assessments - Analysis of the use of energy and potential for energy efficiency in an industrial facility * Current situation * Recommendations for improving energy efficiency * Cost-benefit analysis of recommended options * An action plan for realizing potential savings Types of Industrial Energy Efficiency Assessments - Preliminary or walk-through - Detailed or diagnostic Audit criteria

228

ORISE: Hazard Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and collaborators have, for example, conducted an assessment of health outcomes among nuclear technology workers at the RocketdyneAtomics International (AI) Santa Susana Field...

229

PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE  

E-Print Network (OSTI)

Disaster Preparedness, Response and Recovery #12;2 Louisiana State University Health Sciences CenterDISASTER PSYCHOSOCIAL ASSESSMENT AND SURVEILLANCE TOOLKIT (Disaster-PAST) Methods to Enhance

230

Condition and Life Assessment  

Science Conference Proceedings (OSTI)

Table 3   Regulations and standards on life assessment...to TRD 508 Italy ISPESL (1992). Components of steam generators and

231

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

232

A Methodology to Assess the Reliability of Hydrogen-based Transportation Energy Systems  

E-Print Network (OSTI)

products from remote, aging refineries. The consequences ofand hostile territory, refineries are aging and are notProcessing 161 petroleum refineries 74,000 miles of crude

McCarthy, Ryan

2004-01-01T23:59:59.000Z

233

Section 4.9 of the In Search of Truth Project Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Post Mile 22.30. Other county roads adjacent to the construction of the food servicelaundry building and mechanical building are County Road 161 and County Road 203...

234

The Idaho National Engineering and Environmental Laboratory Source Water Assessment  

Science Conference Proceedings (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 square miles and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEEL's drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Survey's Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agency's Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a this vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEEL's Source Water Assessment. Of the INEEL's 12 public water systems, three systems rated as low susceptibility (EBR-1, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEEL's public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, G.

2003-03-17T23:59:59.000Z

235

INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER  

SciTech Connect

The U. S. Department of Energys Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

MELINDA KRAHENBUHL

2010-05-28T23:59:59.000Z

236

DOEEA-1203 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

237

SPAT 15 - Assessment  

Science Conference Proceedings (OSTI)

In the Spring of 1997, the Department of Energy's Department Standards Committee (DSC) convened a Standards Process Action Team (SPAT-15) to evaluate assessment processes within the DOE complex. If time and resources permitted, the team was also to evaluate assessment processes used by private industry conducting similar work and activities. The specific task statement was as follows: "Define the attributes of assessment programs that effectively support organizational feedback and improvement of safety systems at all the different levels of contractor and Department organizations." The team gathered information on existing assessment programs through surveys and presentations by representatives from national laboratories, processing facilities, and remediation sites. Examples of assessment programs described in this report encompass site-wide, individual facility, and task level applications within the DOE compIex

Bartley, J.C. (Coordinator)

1998-08-01T23:59:59.000Z

238

Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project  

SciTech Connect

This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

1984-12-01T23:59:59.000Z

239

Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado  

SciTech Connect

Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

NONE

1996-03-01T23:59:59.000Z

240

Integrated assessment briefs  

Science Conference Proceedings (OSTI)

Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

NONE

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Risk Assess - updated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Software Development Risk Assessment Software Development Risk Assessment Note: The purpose of this prompt list is to provide project managers with a tool for identifying and planning for potential project risks. It is process-based and supports the framework established by the DOE Software Engineering Methodology. It will be used within the stage exit process as an additional tool to ensure that the project manager has identified and is managing known risk factors. Additional detailed information describes the various risk factors and how to score them. Performing a risk assessment is an important step in being prepared for potential problems that can occur within any software project. During the risk assessment, if a potential risk is identified, a solution or plan of action should be developed. (A problem analyzed and planned

242

Preliminary Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

243

FINAL ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

244

IAAP Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEEDS ASSESSMENT-DECEMBER 2001 NEEDS ASSESSMENT-DECEMBER 2001 Burlington Atomic Energy Commission Plant- Former Worker Program A US DOE funded project conducted by: Dr. Laurence Fuortes, Principal Investigator The University of Iowa College of Public Health Department of Occupational and Environmental Health 5 2940 Steindler Building Iowa City, IA 52242 TEL: 319 335 9819 FAX: 319 335 9200 BACEP-FWP Needs Assessment 1. INTRODUCTION In August of 2000, the University of Iowa College of Public Health initiated a needs assessment study to evaluate whether or not individuals formerly employed by the Department of Energy (DOE) at the Iowa Army Ammunition Plant (IAAP) near Burlington, Iowa, would benefit from a Former Worker Medical Surveillance Program. These workers were employed at IAAP in the atomic weapons industry on what was known at the facility as Line 1 or Division B at the

245

Operation and Maintenance Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

and cost-effective is the first step to obtaining energy-efficient building performance. An O&M assessment provides a systematic look at all aspects of the current O&M...

246

Bayesian Climate Change Assessment  

Science Conference Proceedings (OSTI)

A Bayesian fingerprinting methodology for assessing anthropogenic impacts on climate was developed. This analysis considers the effect of increased CO2 on near-surface temperatures. A spatial CO2 fingerprint based on control and forced model ...

L. Mark Berliner; Richard A. Levine; Dennis J. Shea

2000-11-01T23:59:59.000Z

247

Assessment of Phase Conductors  

Science Conference Proceedings (OSTI)

As transmission systems age, utilities are increasingly concerned about the reliability of aging conductors, especially ACSR conductors. Traditional methods for assessing conductors involve identifying the circuits that pose the greatest reliability risk and subjecting samples from suspect lines to tensile testing, but a range of corrosion detection methods have become available that increase the options available to utilities. This report describes several methods available for conductor assessment.

2009-12-23T23:59:59.000Z

248

ASSESSMENT OF A FLOW ENHANCEMENT PROJECT AS A RIPARIAN AND FISHERY HABITAT MITIGATION EFFORT  

E-Print Network (OSTI)

project in the Little Snake River Drainage, Wyoming, the flow in a previously ephemeral watercourse the North Platte River basin of southeast Wyoming, 20 miles east of Laramie within the boundaries and Crystal Lake Reservoirs. The upper 5.5 miles of stream is on national forest lands while the lower 4

249

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

250

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

251

Luser_SupCompetencyAssessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

employee assessment, reviewing completed assessments, and viewing the competency history. Task A. View Gaps and Assign Items From the Home page, click the My Employees tab....

252

Second National Climate Assessment (2009)  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt What is the Second National Climate Assessment? The Second National Climate Assessment, entitled Global Change Impacts in the United States, was published in...

253

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

risk assessment information used to evaluate and remediate legacy contamination from the Manhattan Project. The RAIS was designed to provide all risk assessment processes in a...

254

DRAFT ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

255

Bioenergy Assessment Toolkit  

NLE Websites -- All DOE Office Websites (Extended Search)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte Produced under direction of the United States Agency for International Development by the National Renewable Energy Laboratory (NREL) under Interagency Agreement AEG-P-00-00003-00; Work for Others Agreement number 3010543; Task Numbers WFE2.1012, WFE2.1013, and WFE2.1014. Technical Report NREL/TP-6A20-56456 October 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 303-275-3000 * www.nrel.gov Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte

256

TECHNOLOGY READINESS ASSESSMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

257

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site August 1, 2009 U.S. Department of Energy; Office of Science; Office of Workforce Development for Teachers and Scientists (WDTS) System location - Pacific Northwest National Laboratory, Richland, WA Name of Information iPASS System for DOE Office of Science laboratory fellowship programs, including

258

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

259

Windows technology assessment  

SciTech Connect

This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

Baron, J.J.

1995-10-01T23:59:59.000Z

260

PRIVACY IMPACT ASSESSMENT: Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Depamnf!l1tal Elel1l~nt&$ite july 23, 2009 Office of Information Resources Office of Management DOE Headquarters, Germantown, Germantown Computer Center Server Room Nameonl1fol'l11i1tion Sysleijlprl'f 'Project FOIAXpress ExhibitProj~tUID TBD NeWPIA ~ Update D Please indicate whether this is a new

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

HEPA Filter Vulnerability Assessment  

SciTech Connect

This assessment of High Efficiency Particulate Air (HEPA) filter vulnerability was requested by the USDOE Office of River Protection (ORP) to satisfy a DOE-HQ directive to evaluate the effect of filter degradation on the facility authorization basis assumptions. Within the scope of this assessment are ventilation system HEPA filters that are classified as Safety-Class (SC) or Safety-Significant (SS) components that perform an accident mitigation function. The objective of the assessment is to verify whether HEPA filters that perform a safety function during an accident are likely to perform as intended to limit release of hazardous or radioactive materials, considering factors that could degrade the filters. Filter degradation factors considered include aging, wetting of filters, exposure to high temperature, exposure to corrosive or reactive chemicals, and exposure to radiation. Screening and evaluation criteria were developed by a site-wide group of HVAC engineers and HEPA filter experts from published empirical data. For River Protection Project (RPP) filters, the only degradation factor that exceeded the screening threshold was for filter aging. Subsequent evaluation of the effect of filter aging on the filter strength was conducted, and the results were compared with required performance to meet the conditions assumed in the RPP Authorization Basis (AB). It was found that the reduction in filter strength due to aging does not affect the filter performance requirements as specified in the AB. A portion of the HEPA filter vulnerability assessment is being conducted by the ORP and is not part of the scope of this study. The ORP is conducting an assessment of the existing policies and programs relating to maintenance, testing, and change-out of HEPA filters used for SC/SS service. This document presents the results of a HEPA filter vulnerability assessment conducted for the River protection project as requested by the DOE Office of River Protection.

GUSTAVSON, R.D.

2000-05-11T23:59:59.000Z

262

Geothermal-resource assessment of the Steamboat-Routt Hot Springs area, Colorado. Resources Series 22  

DOE Green Energy (OSTI)

An assessment of the Steamboat Springs region in northwest Colorado was initiated and carried out in 1980 and 1981. The goal of this program was to delineate the geological features controlling the occurrence of the thermal waters (temperatures in excess of 68/sup 0/F (20/sup 0/C)) in this area at Steamboat Springs and 8 miles (12.8 km) north at Routt Hot Springs. Thermal waters from Heart Spring, the only developed thermal water source in the study area, are used in the municipal swimming pool in Steamboat Springs. The assessment program was a fully integrated program consisting of: dipole-dipole, Audio-magnetotelluric, telluric, self potential and gravity geophysical surveys, soil mercury and soil helium geochemical surveys; shallow temperature measurements; and prepartion of geological maps. The investigation showed that all the thermal springs appear to be fault controlled. Based on the chemical composition of the thermal waters it appears that Heart Spring in Steamboat Springs is hydrologically related to the Routt Hot Springs. This relationship was further confirmed when it was reported that thermal waters were encountered during the construction of the new high school in Strawberry Park on the north side of Steamboat Springs. In addition, residents stated that Strawberry Park appears to be warmer than the surrounding country side. Geological mapping has determined that a major fault extends from the Routt Hot Springs area into Strawberry Park.

Pearl, R.H.; Zacharakis, T.G.; Ringrose, C.D.

1983-01-01T23:59:59.000Z

263

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

264

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

265

Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

266

Industrial Assessment Center  

SciTech Connect

Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

Dr. Diane Schaub

2007-03-05T23:59:59.000Z

267

Fish Passage Assessment: Big Canyon Creek Watershed, Technical Report 2004.  

DOE Green Energy (OSTI)

This report presents the results of the fish passage assessment as outlined as part of the Protect and Restore the Big Canyon Creek Watershed project as detailed in the CY2003 Statement of Work (SOW). As part of the Northwest Power Planning Council's Columbia Basin Fish and Wildlife Program (FWP), this project is one of Bonneville Power Administration's (BPA) many efforts at off-site mitigation for damage to salmon and steelhead runs, their migration, and wildlife habitat caused by the construction and operation of federal hydroelectric dams on the Columbia River and its tributaries. The proposed restoration activities within the Big Canyon Creek watershed follow the watershed restoration approach mandated by the Fisheries and Watershed Program. Nez Perce Tribal Fisheries/Watershed Program vision focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects. We strive toward maximizing historic ecosystem productive health, for the restoration of anadromous and resident fish populations. The Nez Perce Tribal Fisheries/Watershed Program (NPTFWP) sponsors the Protect and Restore the Big Canyon Creek Watershed project. The NPTFWP has the authority to allocate funds under the provisions set forth in their contract with BPA. In the state of Idaho vast numbers of relatively small obstructions, such as road culverts, block thousands of miles of habitat suitable for a variety of fish species. To date, most agencies and land managers have not had sufficient, quantifiable data to adequately address these barrier sites. The ultimate objective of this comprehensive inventory and assessment was to identify all barrier crossings within the watershed. The barriers were then prioritized according to the amount of habitat blocked at each site and the fish life history stages impacted. This assessment protocol will hopefully prove useful to other agencies and become a model for use in other watersheds.

Christian, Richard

2004-02-01T23:59:59.000Z

268

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates32.doc More Documents & Publications EV Guideline Assessment Templates...

269

EV Guideline Assessment Templates | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates DOEEVGuidelineAssessmentTemplates320.doc More Documents & Publications EV Guideline Assessment Templates...

270

Energy Efficiency Potential Assessment: (Appendices)  

Science Conference Proceedings (OSTI)

This document contains the appendices to EPRI Report 1008911, "Energy Efficiency Potential Assessment."

2003-07-28T23:59:59.000Z

271

Oak Ridge Reservation Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE))

Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

272

Predictive Maintenance Assessment Guidelines  

Science Conference Proceedings (OSTI)

This document is the third in a series of guidelines designed to help electric power utilities develop programs that take advantage of diagnostic technologies used to detect problems in machinery. The PDM Assessment Guidelines provide the procedures necessary to plan and implement a plant wide predictive maintenance program.

1997-12-02T23:59:59.000Z

273

Peer assessment using arop  

Science Conference Proceedings (OSTI)

Arop is a web-based peer assessment support tool that has been used extensively in a wide variety of settings over the past three years. We describe the design of Arop and how it can be configured, and present some results from a research ...

John Hamer; Catherine Kell; Fiona Spence

2007-01-01T23:59:59.000Z

274

Packaged CHP System Assessment  

Science Conference Proceedings (OSTI)

The Packaged CHP System Assessment report provides an analysis of packaged combined heat and power (CHP) systems. The report summarizes and compares the technical characteristics of commercial product lines with electric power output up to 3,000 kWe.

2004-03-22T23:59:59.000Z

275

Geothermal industry assessment  

DOE Green Energy (OSTI)

An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

Not Available

1980-07-01T23:59:59.000Z

276

Supplemental Environmental Assessment  

E-Print Network (OSTI)

In 2007, the U.S. Department of the Navy (Navy) prepared the Environmental Assessment for the Disposal of Naval Activity Puerto Rico (2007 EA) to evaluate the potential environmental impacts associated with the disposal of Naval Activity Puerto Rico (NAPR) in accordance with the

unknown authors

2011-01-01T23:59:59.000Z

277

Crossarm Inspection and Assessment  

Science Conference Proceedings (OSTI)

Linemen frequently use wood pole inspection methods to inspect crossarms, and little work has been done to specifically address the inspection of wood, steel, or fiberglass crossarms. This report outlines the development of a test bed and associated protocols required to assess currently available and prospective inspection technologies and techniques for evaluation of in-service crossarms.

2009-12-23T23:59:59.000Z

278

Venetie, Alaska energy assessment.  

Science Conference Proceedings (OSTI)

This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

2013-07-01T23:59:59.000Z

279

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

280

National Climate Assessment: Production Team  

NLE Websites -- All DOE Office Websites (Extended Search)

NCA & Development Advisory Committee NCA & Development Advisory Committee Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Production Team Print E-mail National Climate Assessment Staff (USGCRP National Coordination Office) Current NCA Staff Dr. Fabien Laurier, Director, Third National Climate Assessment Dr. Glynis Lough, Chief of Staff for the National Climate Assessment Emily Therese Cloyd, Engagement Coordinator for the National Climate Assessment Bryce Golden-Chen, Program Coordinator for the National Climate Assessment Alison Delgado, Scientist Dr. Ilya Fischhoffkri, Scientist Melissa Kenney, Indicators Coordinator Dr. Fred Lipschultz, Regional Coordinator for the National Climate Assessment

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC  

Open Energy Info (EERE)

Assessments and Assessment Capabilities in APEC Assessments and Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Biomass Topics Resource assessment Website http://www.nrel.gov/internatio Country Australia, Brunei, Canada, Chile, China, Indonesia, Japan, South Korea, Malaysia, Mexico, New Zealand, Papua New Guinea, Peru, Philippines, Russia, Chinese Taipei, Thailand, United States, Vietnam Australia and New Zealand, South-Eastern Asia, Northern America, South America, Eastern Asia, South-Eastern Asia, Eastern Asia, Eastern Asia, South-Eastern Asia, Central America, Australia and New Zealand, Melanesia, South America, South-Eastern Asia, Eastern Europe, , South-Eastern Asia, Northern America, South-Eastern Asia

282

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

283

DOEM-1123 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEM-1123 DOEM-1123 Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washin%E E ~ U.S. Department of Energy Richland, Washington November 1995 DOE/EA - 1 123 ENVIRONMENTAL ASSESSMENT TRANSFER OF NORMAL AND LOW-ENRICHED URANIUM BILLETS TO THE UNITED KINGDOM HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY NOVEMBER 1995 This page intentionally left blank. U.S. Department of Energy Glossary Glossary Acronyms and Ini ti a1 isms ALARA BNFL CERL CFR CY DOE DOH DOT EA FR IAEA IMO I so LCF LEU LSA NAC NCRP NEA , NEPA PNL rem WAC WHC As Low As Reasonably Achievable British Nuclear Fuels Limited, Inc. Construction Engineering Resources Laboratory Code o f Federal Regulations Calendar Year

284

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

285

DOEEA-0984 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

286

Mercury Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED WITH COAL-FIRED POWER PLANTS: IMPACTS OF LOCAL DEPOSITIONS *T.M. Sullivan 1 , F.D. Lipfert 2 , S.M. Morris 2 , and S. Renninger 3 1 Building 830, Brookhaven National Laboratory, Upton, NY 11973 2 Private Consultants 3 Department of Energy, National Energy Technology Laboratory, Morgantown, WV ABSTRACT The U.S. Environmental Protection Agency has announced plans to regulate emissions of mercury to the atmosphere from coal-fired power plants. However, there is still debate over whether the limits should be placed on a nationwide or a plant-specific basis. Before a nationwide limit is selected, it must be demonstrated that local deposition of mercury from coal-fired power plants does not impose an excessive local health risk. The principal health

287

EV Guideline Assessment Templates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Guideline Assessment Templates EV Guideline Assessment Templates |1. Process: Organization |2. Guideline No: 1|3. Contractor: |4.Contract/project(s): | ||||| ||||| |5. Guideline Statement: Define the authorized work elements for the program. A work breakdown structure (WBS), tailored for effective internal management control, is commonly used in this process. | || |6. Documentation Required: 1) CLINs 2) WBS 3) WBS Dictionary | || || || |7. Instructions: Why this is important: The WBS represents the entire scope of work in the project, a "picture" of the work. The first level is the total system, and it continues down in successively smaller elements until it reaches the level of detail necessary for management action and control. This picture of the work is needed to facilitate traceability, ensure the

288

DOEEA-1177 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Environmental Assessment SalvageDemolition of 200 West Area, 200 East Area and 300 Area Steam Plants, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington October 1996 DOE/EA-1177 ENVIR0NMEN"AL ASSESSMENT' FOR THE SALVAGE/DEMOLITION OF 200 WEST AREA, '200 EAST AREA, AND 300 AREA STEAM PLANTS U . S . DEPARTMENT OF ENERGY RICHLAND, WASHINGTON OCTOBER 1996 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available origid document. DOE/EA- 1177 U.S. Department o f Energy Preface Appendices. Additional information necessary t o support an understanding of the proposed action, a1 ternati ves , and potenti a1 impacts i s provided. Comments resul ti.ng from review o

289

Guidelines for Exposure Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Z-92/001 Z-92/001 May 1992 Guidelines for Exposure Assessment Published on May 29, 1992, Federal Register 57(104):22888-22938 These guidelines replace the previously issued final Guidelines for Estimating Exposures (September 24, 1986), Federal Register 51(185):34042-34054, and the Proposed Guidelines for Exposure-Related Measurements (December 2, 1988), Federal Register 53(232):48830- 48853. Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Note: This document represents the final guidelines. A number of editorial corrections have

290

National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Production Team Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Overview Print E-mail What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

291

needs_assessment.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Office Needs Assessment Workshop Education Office Needs Assessment Workshop On October 2, 40 educators from 15 school districts met at Fermilab to discuss the status of science education in the context of state and national frameworks. Districts were selected at random from DuPage and Kane counties, and superintendents selected a team to represent the district at the workshop. The group provided input to the Education Office regarding future program direction. Over the next few months the Education Office will be reviewing program offerings in light of the issues raised below. In the meantime, we invite you to visit the Teacher Resource Center which serves as our clearinghouse or call Susan Dahl at 630-840-3094 for assistance. If you would like a scientist to visit your classroom, participate in a career fair or serve as

292

Oil Market Assessment  

Gasoline and Diesel Fuel Update (EIA)

Logo Oil Market Assessment - September Logo Oil Market Assessment - September 12, 2001 EIA Home Page Based on Energy Information Administration (EIA) contacts and trade press reports, overall U.S. and global oil supplies appear to have been minimally impacted by yesterday's terrorist attacks on the World Trade Center and the Pentagon. Rumors of scattered closures of U.S. refineries, pipelines, and terminals were reported, and Louisiana Offshore Oil Port operations were partially suspended. While the NYMEX and New York Harbor were temporarily closed, operations are expected to resume soon. Most, if not all petroleum industry infrastructure is expected to resume normal operations today or in the very near term. Prices at all levels (where markets were open) posted increases yesterday, but many prices fell today, as initial reactions

293

Pantex Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Needs Assessment Pantex Needs Assessment Phase I Summary and Recommendation Based upon the availability of information to access former workers, and given the knowledge regarding past exposures to hazardous agents, it is recommended that a Phase II examination program be established for former Pantex workers. This will be in keeping with other DOE mandates and programs, and will assist with the current DOE compensation program. I. Introduction and Background The Department of Energy has established a program to meet the medical oversight needs of former workers who worked at a variety of Department of Energy facilities in connection with the nuclear programs of the United States. It has been recognized that these workers might have been exposed to potentially hazardous materials, and that they were deserving of medical

294

Boiler Condition Assessment Guideline  

Science Conference Proceedings (OSTI)

This report Boiler Condition Assessment Guideline provides a concise overview of procedures developed by the Electric Power Research Institute EPRI to help power plant operators cost-effectively determine the extent of degradation and remaining life of key boiler components. The Guideline draws from EPRIs detailed area-specific guidelines, which in turn are based on extensive research findings by EPRI, member companies, and other organizations. This Guideline offers a starting point for power plant perso...

2010-12-23T23:59:59.000Z

295

Protective Coatings Assessment  

Science Conference Proceedings (OSTI)

This report describes assessments of ceramic and thermal spray coatings that have advanced significantly or recently been marketed for use in the utility boiler industry to reduce slagging, mitigate fireside corrosion and potentially, circumferential cracking due to cyclic temperature variations. These innovations promise to enhance coating quality as well as reduce time and labor required to protect large areas of the boiler waterwalls. Coatings may also enable plants to improve production rates; thereb...

2011-12-22T23:59:59.000Z

296

Draft Risk Assessment Processes  

Science Conference Proceedings (OSTI)

A cyber security risk assessment process includes the characterization of assets. A thorough asset characterization process can lead to a more robust threat characterization. One means of enhancing the thoroughness of the asset-and-threat characterization processes is to improve the characterization mechanisms. This technical update supports this approach by providing the results of initial research and developing a framework to support further analysis.This project builds upon the work ...

2012-12-28T23:59:59.000Z

297

Maintenance Effectiveness Assessment  

Science Conference Proceedings (OSTI)

Utilities want to know whether their equipment is being maintained in the most effective manner. Understanding the relationship between maintenance costs and benefits becomes even more important when established practices and schedules change. This report defines the problem of and presents a roadmap for the development of metrics for evaluating substation equipment maintenance effectiveness. A proposed suite of tools for assessing maintenance effectiveness TAME can provide a business analytics framework...

2010-12-23T23:59:59.000Z

298

Aging Cable Assessment Guideline  

Science Conference Proceedings (OSTI)

Medium- and low-voltage cables have provided reasonable service in power plants. However, there is a concern that cables that have experienced long periods of stressed service and especially wet service might degrade and fail in service. Because most plants have had few problems with cables, little on-staff experience with cables exists at most sites. This report provides information that will be of practical use when assessing cable longevity in adverse environments and service conditions that may ...

2013-12-17T23:59:59.000Z

299

Field Guide: Coatings Assessment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has numerous products to help plant personnel meet the challenges of working with aging systems, structures, and components, but none that comprehensively address protective coatings and linings. This field guide provides a compilation of protective coating and lining information in a form that allows the user to have a ready reference available during condition assessment of the various protective coatings and linings used in the plant.

2012-05-14T23:59:59.000Z

300

Assessment summary, Jan. 2004  

E-Print Network (OSTI)

and internal use as focal point) Draft consideration of use battery Rewrite paper expanding Research & Network models SQW meeting in Cambridge SIKE/Assessment: 3 to 5 months Lessons learned from Connections - briefings First implementation of IRO at CU... support letters from ONE & Scotland Coordination meeting of Cummings/Horner/Tanner SIKE & KICs: 3 Greitzer meetings planned Innovation Centre: Set BT/CW priorities for March/April events Brief CMI management (What was said to Davies, Aldridge...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Assessment and Outlook  

E-Print Network (OSTI)

My assignment at this conference is to assess where we are in high-energy physics and speculate on where we might be going. This frees me from any obligation to summarize all that went on here and allows me to talk just about those topics that interest me the most at this time. I will let my prejudices show and talk a bit about physics in general, CP violation, neutrinos, accelerators, non-accelerator experiments, and even theory.

Burton Richter

2000-01-04T23:59:59.000Z

302

Integrated Assessment | Open Energy Information  

Open Energy Info (EERE)

Integrated Assessment Integrated Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Integrated Assessment: Mainstreaming sustainability into policymaking--A guidance manual Agency/Company /Organization: United Nations Environment Programme Topics: Background analysis Website: www.unep.ch/etb/publications/AI%20guidance%202009/UNEP%20IA%20final.pd Equivalent URI: cleanenergysolutions.org/content/times-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance References: Integrated Assessment[1] The Times Integrated Assessment Model (TIAM) comprises several thousand technologies in all sectors of the energy system. It is characterized by several technical and economic parameters and by emission coefficients for

303

Process Management Maturity Assessment Process Management Maturity Assessment  

E-Print Network (OSTI)

This paper outlines a Business Process Management implementation approach in a large international company. It introduces a Process Management Maturity Assessment (PMMA) which was developed to assess the implementation of Business Process Management. The maturity model is based on the assessment of nine categories which comprehensively cover all aspects which impact the success of Business Process Management. Some findings of the first assessment round are presented to illustrate the benefits of the PMMA approach.

Michael Rohloff; Michael Rohloff

2009-01-01T23:59:59.000Z

304

Uncertainties in energy technology assessments  

E-Print Network (OSTI)

In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

Coate, David

1980-01-01T23:59:59.000Z

305

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Debra Stewart at (865)482-2657 or dthomas3@utk.edu. Risk assessments conducted for the DOE-ORO should implement Guidance for Conducting Risk Assessments and Related Risk...

306

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents - ORR Risk Assessment Documents - ORR Bullet Baseline Risk Assessments Bullet Remedial Investigation/Feasibility Study Environmental Assessment Report South Campus Facility, Oak Ridge Tenn [DOE/OR/02-1274&D] Bullet Baseline Risk Assessment for Lower East Fork Poplar Creek [DOE/OR/1119 & D2 & V2] Bullet Remedial Investigation/ Feasibility Study Report for Lower Watts Bar Reservoir Operable Unit [DOE/OR/01 1282 & D1] [ORNL/ER-2] Bullet The Utility of Existing Data Conducting a CERCLA Baseline Risk Assessment for Lower Watts Bar Reservoir (draft) [ORNL/ER-?] Bullet East Fork Poplar Creek Sewer Line Beltway Remedial Investigation Report [DOE/OR/02-1119&D2] Bullet Screening Risk Assessments Bullet Preliminary Assessment of Radiation Doses to the Public from Cesium

307

Performance Assessment Scoping - Hanford Example  

Performance Assessment Scoping - Hanford Example Linda Suttora Office of Environmental Compliance DOE-HQ Waste Processing Technical Exchange 2010

308

Integrated Assessment Modeling  

Science Conference Proceedings (OSTI)

This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

2012-10-31T23:59:59.000Z

309

Multivariate statistical analyses of groundwater surrounding Forty mile wash  

SciTech Connect

Groundwater chemistry data from 211 sampling locations in the vicinity of Yucca Mountain, Nevada are analyzed using multivariate statistical methods in order to better understand groundwater chemical evolution, ascertain potential flow paths and determine hydrochemical facies. Correspondence analysis of the major ion chemistry is used to define relationships between and among major ions and sampling locations. A k-means cluster analysis is used to determine hydrochemical facies based on correspondence analysis dimensions. The derived dimensions and hydrochemical facies are presented as bi-plots and overlaid on a digital elevation model of the region giving a visual picture of potential interactions and flow paths. A distinct signature of the groundwater chemistry along the extended flow path of Fortymile Wash can be observed along with some potential interaction at possible fault lines near Highway I-95. The signature from Fortymile Wash is believed to represent the relict of water that infiltrated during past pluvial periods when the amount of runoff in the wash was significantly larger than during the current drier period. This hypothesis appears to be supported by hydrogen-2 and oxygen-18 data which indicate that younger groundwater is found in the upper part of the wash near Yucca Mountain and older groundwater is found in the lower region of the wash near Amargosa River. The range of the hydrogen-2 data corresponds to precipitation in a period of relatively cold climate and has a similar spatial signature to the oxygen-18 data. If the hypothesis that current groundwater chemistry primarily reflects past focused infiltration of surface runoff rather than regional groundwater migration is correct, then saturated zone transport from Yucca Mountain may be much slower than is currently anticipated. (authors)

Woocay, A.; Walton, J.C. [El Paso Univ. of Texas, Environmental Science and Engineering, TX (United States)

2007-07-01T23:59:59.000Z

310

Vehicle routing for the last mile of power system restoration  

SciTech Connect

This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

Bent, Russell W [Los Alamos National Laboratory; Coffrin, Carleton [Los Alamos National Laboratory; Van Hentenryck, Pascal [BROWN UNIV.

2010-11-23T23:59:59.000Z

311

Wind, Klickitat, Hood and Fifteen Mile Habitat Site Visits  

E-Print Network (OSTI)

and HR only Three -day Overview Van/Driver: (1) Lynn Palensky (cell: 503-432-6477) (Lynn picks up van-way stop sign in Carson, Turn Left (East) onto Hot Springs Ave. Follow Hot Springs Ave down the hill

312

Microsoft Word - 10_Million_Loaded_Miles.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

of more than 8,400 shipments to WIPP arrived 11 years ago from Los Alamos National Laboratory in northern New Mexico. "There's no doubt, some of the best drivers in the...

313

1894 NYT19990211.0075 -1 142 million miles 1894 ...  

Science Conference Proceedings (OSTI)

... XIE19970212.0231 -1 Irkutsk Aircraft Manufacturing Company ... 0054 -1 American Civil Liberties Union 2058 ... 1 Statue of Liberty 2102 APW19990709 ...

2003-10-01T23:59:59.000Z

314

Seven Mile Hill Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Policies International Clean Energy Analysis Low Emission Development Strategies Oil & Gas Smart Grid Solar U.S. OpenLabs Utilities Water Wind Page Actions View source History...

315

Compound and Elemental Analysis At Seven Mile Hole Area (Larson...  

Open Energy Info (EERE)

present in great enough concentrations to be detected by the PIMA. Petrographic and electron microprobe analyses of selected samples were conducted in the laboratories of the...

316

Elevated Hydrogen Management for Three Mile Island Unit 1  

Science Conference Proceedings (OSTI)

The Chemistry, Fuel Reliability and Material Reliability Programs at the Electric Power Research Institute (EPRI) have developed a comprehensive Elevated Reactor Coolant System (RCS) Hydrogen Program that is focused on qualification of plant operation with dissolved hydrogen concentration in the RCS greater than 50 standard cubic centimeters per kilogram (scc/kg) and up to 60 scc/kg to mitigate primary water stress corrosion cracking (PWSCC) in nickel-based alloys. Currently, the industry-wide RCS upper ...

2010-12-22T23:59:59.000Z

317

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network (OSTI)

WESTERN WATER ASSESSMENT WHITE PAPER Socioeconomic Impacts and Adaptation Strategies: Assessing://www.socioeconimpacts.org and is described in greater detail in a companion white paper, "Socioeconomic Impacts and Adaptation Strategies: Assessing Research on Drought, Climate Change and Recreation". This white paper discusses literature

Neff, Jason

318

Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment  

Science Conference Proceedings (OSTI)

This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the States posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

2009-06-01T23:59:59.000Z

319

TEPP Planning Products Model Needs Assessment Self Assessment Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Products Planning Products Model Needs Assessment Self Assessment Document Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-13.p65 1 Model Needs Assessment R E V 8 - 0 7 / 2 0 1 2 T r a n s p o r t a t i o n E m e r g e n c y P r e p a r e d n e s s P r o g r a m PURPOSE The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident involving radioactive material. 1.0 INTRODUCTION This Model Needs Assessment was developed by the Department of Energy's Transportation Emergency Preparedness Program (TEPP) as a planning and assessment tool for state, tribal, or local government officials. To implement this Model Needs Assessment, a designated official

320

Engineering assessment of inactive uranium mill tailings, Shiprock site, Shiprock, New Mexico  

SciTech Connect

Ford, Bacon and Davis Utah Inc. has reevaluated the Shiprock site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.5 million dry tons of tailings at the Shiprock site constitutes the most significant environental impact, although windblown tailings and external gamma radiation also are factors. The eight alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $13,400,000 for stabilization in place to about $37,900,000 for disposal at a distance of about 16 miles. Three principal alternatives for the reprocessing of the Shiprock tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $230/lb by heap leach and $250/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive.

Not Available

1981-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

322

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

323

Risk assessment handbook  

SciTech Connect

The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

1990-09-01T23:59:59.000Z

324

NATURAL RESOURCES ASSESSMENT  

DOE Green Energy (OSTI)

The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

D.F. Fenster

2000-12-11T23:59:59.000Z

325

Oregon Trail Mushrooms geothermal loan guaranty application, Malheur County, Oregon: Environmental assessment  

DOE Green Energy (OSTI)

The action assessed is the guaranty of a loan by the Geothermal Loan Guaranty Office of the US Department of Energy (DOE) to finance the construction and operation of a mushroom-growing facility that will use geothermal (hot) water for process and space heat. The project consists of two separate facilities: a growing facility located just outside of the eastern limit of the city of Vale, Oregon (Malheur County, Oregon) and a composting facility located about 6.4 km (4 miles) southwest of the city limits (also in Malheur County, Oregon). Five test wells have been drilled into the geothermal resource at the growing site. Either well No. 4 or well No. 5 will serve as a production well. All geothermal fluids will be reinjected into the geothermal aquifer, so either well No. 3 will be used for this purpose, wells Nos. 1 and 2 will be deepened, or a new well will be drilled on the site. A cold-water well will be drilled at the growing site, and another will be drilled at the composting site. The environmental effects of the proposed project are not expected to be significant.

Not Available

1981-05-01T23:59:59.000Z

326

Environmental assessment: Coolidge-Saguaro 115-kV rehabilitation, Pinal County, Arizona  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) presents an analysis of the environmental impacts of the proposed rehabilitation of 29.6 miles of the Coolidge-Saguaro 115-kV transmission line. The project area is in Pinal County, Arizona. The proposal involves reconductoring the line with larger conductor, replacement of deteriorated structures, and replacement of damaged insulators. The proposed action is being considered in order to increase the safety and reliability of this line. The alternative of no action is also addressed in this EA. The proposed action would have insignificant impacts on wildlife, vegetation or other natural resources. There would be no impacts on floodplains or wetlands. The major impact would be on agricultural crops but much of this can be minimized by the timing of construction. There are no conflicts with county or local planning projects. No cultural resources will be affected by the proposed action. The no action alternative would not correct the potential safety hazard or reliability problems of the existing line.

Not Available

1982-09-01T23:59:59.000Z

327

DOEYEA-0856 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEYEA-0856 DOEYEA-0856 Environmental Assessment for Construction and Operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory Berkeley, California December 1994 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

328

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

LCSAD-001, Ver. 2 LCSAD-001, Ver. 2 Linac Commissioning Safety Assessment Document for the National Synchrotron Light Source II Photon Sciences Directorate Version 2 May 11, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II ii LT-C-ESH-LCSAD-001 ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

329

Draft Supplemental Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

330

Superfund Exposure Assessment Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

1-881001 1-881001 OSWER Directive 9285.5-1 April 1988 Superfund Exposure Assessment Manual U.S. Environmental Protection Agency Office of Remedial Response Washington, DC 20460 Notice This report was prepared under contract to an agency of the United States Government. Neither the United States Government nor any of its employees, contractors, subcontractors, or their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party' s use of or the results of such use of any information, apparatus, product, or process disclosed in this report, or represents that its use by such third party would not infringe on privately owned rights. ii Table of Contents Chapter Page List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

331

Minority energy assessment report  

SciTech Connect

The purpose of this research is to project household energy consumption, energy expenditure, and energy expenditure as share of income for five population groups from 1991 to 2009. The approach uses the Minority Energy Assessment Model (MEAM), developed by Argonne National Laboratory for the US Department of Energy's Office of Minority Economic Impact. The MEAM provides a framework that can be used to forecast regional energy consumption and energy expenditure for majority, black, Hispanic, poor, and nonpoor households. The forecasts of key macroeconomic and energy variables used as exogenous variables in the MEAM were obtained from the Data Resources, Inc., Macromodel and Energy Model. Generally, the projections of household energy consumption, expenditure, and energy expenditure as share of income vary across population groups and census regions.

Teotia, A.P.S.; Poyer, D.A.; Lampley, L.; Anderson, J.L.

1992-12-01T23:59:59.000Z

332

Draft Enivonmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

333

Preliminary Safety Assessment Document  

NLE Websites -- All DOE Office Websites (Extended Search)

BCSAD-001 BCSAD-001 Photon Sciences Directorate Booster Commissioning Safety Assessment Document For the National Synchrotron Light Source II Version 2 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

334

DOEIEA-1086 Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86 86 Environmental Assessment for Amendments to 10 CFR Part 835 DISCLAIMER Portions of this document may be illegible i n electronic image products. Images are produced f h m the best avaiIable original document. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employes, makes any warranty, express or implied, or a s s u m e s any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spc- cific commercial product, process, or senrice by trade name, trademark, manufac-

335

INEEL Source Water Assessment  

SciTech Connect

The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEELs drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Surveys Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agencys Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEELs Source Water Assessment. Of the INEELs 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEELs public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

Sehlke, Gerald

2003-03-01T23:59:59.000Z

336

Cassini data assessment report  

DOE Green Energy (OSTI)

On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

NONE

1998-08-01T23:59:59.000Z

337

Perceptual quality assessment for compressed video  

E-Print Network (OSTI)

Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

Yang, Kai-Chieh

2007-01-01T23:59:59.000Z

338

Hanford Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Needs Assessment Hanford Needs Assessment July 1997 This Needs Assessment for former Hanford construction workers was developed for the purpose of collecting existing...

339

Pantex Needs Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment Pantex Needs Assessment December 2003 This Needs Assessment for former Pantex workers was developed for the purpose of collecting existing information relevant to...

340

Assessment of Initial Test Conditions for Experiments to Assess Irradiation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Initial Test Conditions for Experiments to Assess Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Irradiation-assisted stress corrosion cracking is a key materials degradation issue in today's nuclear power reactor fleet and affects critical structural components within the reactor core. The effects of increased exposure to irradiation, stress, and/or coolant can substantially increase susceptibility to stress-corrosion cracking of austenitic steels in high-temperature water environments. Despite 30 years of experience, the underlying mechanisms of Irradiation Assisted Stress Corrosion Cracking (IASCC) are unknown. Extended service conditions will increase the exposure

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Welding Cutting and Brazing Assessment Plan Assessment plan ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been...

342

Assessment of environmental health and safety issues associated with the commercialization of unconventional gas recovery: Devonian shale  

SciTech Connect

The purpose of this study is to identify and examine potential public health and safety issues and the potential environmental impacts from recovery of natural gas from Devonian age shale. This document will serve as background data and information for planners within the government to assist in development of our new energy technologies in a timely and environmentally sound manner. This report describes the resource and the DOE eastern gas shales project in Section 2. Section 3 describes the new and developing recovery technologies associated with Devonian shale. An assessment of the environment, health and safety impacts associated with a typical fields is presented in Section 4. The typical field for this assessment occupies ten square miles and is developed on a 40-acre spacing (that is, there is a well in each 40-acre grid). This field thus has a total of 160 wells. Finally, Section 5 presents the conclusions and recommendations. A reference list is provided to give a greater plant. Based on the estimated plant cost and the various cases of operating income, an economic analysis was performed employing a profitability index criterion of discounted cash flow to determine an interest rate of return on the plant investment.

1981-09-01T23:59:59.000Z

343

Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas  

SciTech Connect

The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

Not Available

1993-09-01T23:59:59.000Z

344

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

Assess Oportunities Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

345

UAIEE and Industrial Assessment Centers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UAIEE and IACs UAIEE and IACs Michael B Muller IAC Field Manager Rutgers University 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * Started in 1976 * Currently 26 Centers across the US * Almost 15,000 Assessments * Assessments in all 50 States * Over 111,000 Recommendations * Continues to Grow yearly by: * 400 assessments * 3,000 recommendations 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 IAC Assessments of Small and Medium Manufacturers 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * ABET Accredited Engineering Universities * Director must be a teaching faculty member

346

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

A Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes January 2013 #12;Assessment Handbook 2 Table of Contents Table of Contents............................................................................................1 Assessment Handbook

Hemmers, Oliver

347

Assessment Handbook Creating and Enacting An  

E-Print Network (OSTI)

Assessment Handbook Creating and Enacting An Effective Assessment Program For Student Learning Outcomes July 2012 #12;Assessment Handbook University of Nevada, Las Vegas 1 Table of Contents Assessment Handbook

Hemmers, Oliver

348

Advanced Distribution Automation Technical Assessments  

Science Conference Proceedings (OSTI)

This 2008 progress report on advanced distribution technical assessments focused on the International Electrotechnical Commission (IEC) TC-57 body of standards.

2008-12-19T23:59:59.000Z

349

Lincoln Electric Draft Environmental Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX E. DRAFT EA COMMENTS AND RESPONSES 2 Lincoln Electric Draft Environmental Assessment Comments and Responses Number Commenter Comment Summary Response 1. Euclid Historical...

350

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance for Conducting Risk Assessments and Related Risk Activities for the DOE-ORO Environmental Management Program. BJCOR-271 Guidance for Treatment of Variability and...

351

Conformity Assessment Workshop April 2012  

Science Conference Proceedings (OSTI)

... 2_4 USDA Agricultural Marketing Service - The Breadth of Conformity Assessment Activities in the Federal Arena: Dana K. Stahl, USDA - AMS. ...

2013-06-12T23:59:59.000Z

352

Internal Dose Assessment (IDA) Spreadsheet  

Science Conference Proceedings (OSTI)

The purpose of the Internal Dose Assessment (IDA) Spreadsheet is to calculate internal occupational dose following the methodology described in the EPRI Alpha Monitoring Guidelines.

2007-04-12T23:59:59.000Z

353

PRIVACY IMPACT ASSESSMENT: INL Communications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessments, for reqUirements and additional guidance for conducting a PIA: http:www.directives.doe.govpdfsdoedoetextlneword206o2061.pdf Please complete electronically:...

354

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

011B. Office of Research and Development, Washington, D.C. 1992. Exposure Factors Handbook. EPA6008- 89043. Office of Health and Environmental Assessment, Washington, D.C....

355

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. EPA, Washington, D.C. 1992. Risk Assessment Forum. Wildlife Exposure Factors Handbook. Vol. I. United Staes Environmental Protection Agency. Office of Research and...

356

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

357

Hydrogen energy assessment  

SciTech Connect

The purpose of this assessment is to define the near term and long term prospects for the use of hydrogen as an energy delivery medium. Possible applications of hydrogen are defined along with the associated technologies required for implementation. A major focus in the near term is on industrial uses of hydrogen for special applications. The major source of hydrogen in the near term is expected to be from coal, with hydrogen from electric sources supplying a smaller fraction. A number of potential applications for hydrogen in the long term are identified and the level of demand estimated. The results of a cost benefit study for R and D work on coal gasification to hydrogen and electrolytic production of hydrogen are presented in order to aid in defining approximate levels of R and D funding. A considerable amount of data is presented on the cost of producing hydrogen from various energy resources. A key conclusion of the study is that in time hydrogen is likely to play a role in the energy system; however, hydrogen is not yet competitive for most applications when compared to the cost of energy from petroleum and natural gas.

Salzano, F J; Braun, C [eds.

1977-09-01T23:59:59.000Z

358

Geothermal Energy Resource Assessment  

DOE Green Energy (OSTI)

This report covers the objectives and the status of a long-range program to develop techniques for assessing the resource potential of liquid-dominated geothermal systems. Field studies underway in northern Nevada comprise a systematic integrated program of geologic, geophysical, and geochemical measurements, necessary to specify a drilling program encompassing heat flow holes, deep calibration holes, and ultimately, deep test wells. The status of Nevada field activities is described. The areas under study are in a region characterized by high heat flow where temperatures at depth in some geothermal systems exceed 180 C. Areas presently being examined include Beowawe Hot Springs in Whirlwind Valley. Buffalo Valley Hot Springs, Leach Hot Springs in Grass Valley, and Kyle Hot Springs in Buena Vista Valley. Geologic studies encompass detailed examinations of structure and lithology to establish the geologic framework of the areas. The geothermal occurrences are characterized by zones of intense fault intersection, which furnish permeable channelways for the introduction of meteoric water into regions of high temperature at depth.

Wollenberg, H.A.; Asaro, F.; Bowman, H.; McEvilly, T.; Morrison, F.; Witherspoon, P.

1975-07-01T23:59:59.000Z

359

Fueling area site assessment  

SciTech Connect

This report provides results of a Site Assessment performed at the Fuel Storage Area at Buckley ANG Base in Aurora, Colorado. Buckley ANG Base occupies 3,328 acres of land within the City of Aurora in Arapahoe County, Colorado. The Fuel Storage Area (also known as the Fueling Area) is located on the west side of the Base at the intersection of South Powderhorn Street and East Breckenridge Avenue. The Fueling Area consists of above ground storage tanks in a bermed area, pumps, piping, valves, an unloading stand and a fill stand. Jet fuel from the Fueling Area is used to support aircraft operations at the Base. Jet fuel is stored in two 200,000 gallon above ground storage tanks. Fuel is received in tanker trucks at the unloading stand located south and east of the storage tanks. Fuel required for aircraft fueling and other use is transferred into tanker trucks at the fill stand and transported to various points on the Base. The Fuel Storage Area has been in operation for over 20 years and handles approximately 7 million gallons of jet fuel annually.

1996-08-15T23:59:59.000Z

360

EA-1835: Environmental Assessment Determination | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Determination EA-1835: Environmental Assessment Determination Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project in Chester...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Idaho National Laboratory - Hydropower Program - Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydropower Evaluation Software State Resource Assessments Resource Assessments Reports Technology Transfer Virtual Hydropower Prospector Virtual Hydropower Prospector do Brasil...

362

An Activity-Based Assessment of the Potential Impacts of Plug-In Hybrid Electric Vehicles on Energy and Emissions Using One-Day Travel Data  

E-Print Network (OSTI)

times depend on their battery capacity (20/60 miles) andbattery sizeshigher AER vehicles generally require larger batteries with correspondingly greater electricity capacity,

Recker, W. W.; Kang, J. E.

2010-01-01T23:59:59.000Z

363

RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT  

DOE Green Energy (OSTI)

Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

2012-03-31T23:59:59.000Z

364

Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho  

DOE Green Energy (OSTI)

The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

Not Available

1979-09-01T23:59:59.000Z

365

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

NONE

1995-08-01T23:59:59.000Z

366

Software products for risk assessment  

Science Conference Proceedings (OSTI)

For assessing risks in all environments it is often necessary to use a systematic approach of modeling and simulation with the aim to simplify this process in the framework of designing new technological lines, machines, equipment and processes. Also ... Keywords: crisis management, risk assessment, software products

Jozef Ristvej; Tomas Lovecek

2011-11-01T23:59:59.000Z

367

Cogeneration Assessment Methodology for Utilities  

E-Print Network (OSTI)

A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic assessment model, and a data base to track customers over time. A case study is presented describing the background, procedures, and results of a cogeneration investigation for Northeast Utilities.

Sedlik, B.

1983-01-01T23:59:59.000Z

368

Assessment of Distributed Resource Technologies  

Science Conference Proceedings (OSTI)

This report assesses the current status and prospects for future improvements of distributed resource (DR) technologies: microturbines, PEM fuel cells, solid oxide fuel cells, molten carbonate fuel cells, phosphoric acid fuel cells, reciprocating engines, combustion turbines, stirling engines, and energy storage devices. It also assesses the communications, interconnection, and control systems used by these devices.

1999-12-14T23:59:59.000Z

369

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents ORNL RA Graphic Results ORNL Baseline Risk Assessment Results ORNL Screening Risk Assessment Results ORNL Other Risk Assessment Results ORNL RA Graphic Results WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse (No Fish) Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Industrial Landuse

370

Performance Assessment Community of Practice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L L l W t C t B d High-Level Waste Corporate Board Performance Assessment Community of Practice Community of Practice John E. Marra, Ph.D. Associate Laboratory Director Associate Laboratory Director 5 March 2009 DOE EM HLW Corporate Board Meeting Phoenix, Arizona DOE-EM HLW Corporate Board Meeting Performance Assessment Process Community of Practice Background EM Senior Management would like to have g improved consistency in the execution of the Performance Assessment* process; Originally formed a sub-committee to draft a guidance document for practitioners; Th b itt b li C it f The sub-committee now believes a Community of Practice having broader scope should replace it; Draft Charter in review and presented for Draft Charter in review and presented for discussion. * Performance Assessment (PA) is used broadly to encompass assessments for LLW

371

Radiological dose assessment for residual radioactive material in soil at the clean slate sites 1, 2, and 3, Tonopah Test Range  

SciTech Connect

A radiological dose assessment has been performed for Clean Slate Sites 1, 2, and 3 at the Tonopah Test Range, approximately 390 kilometers (240 miles) northwest of Las Vegas, Nevada. The assessment demonstrated that the calculated dose to hypothetical individuals who may reside or work on the Clean Slate sites, subsequent to remediation, does not exceed the limits established by the US Department of Energy for protection of members of the public and the environment. The sites became contaminated as a result of Project Roller Coaster experiments conducted in 1963 in support of the US Atomic Energy Commission (Shreve, 1964). Remediation of Clean Slate Sites 1, 2, and 3 is being performed to ensure that the 50-year committed effective dose equivalent to a hypothetical individual who lives or works on a Clean Slate site should not exceed 100 millirems per year. The DOE residual radioactive material guideline (RESRAD) computer code was used to assess the dose. RESRAD implements the methodology described in the DOE manual for establishing residual radioactive material guidelines (Yu et al., 1993a). In May and June of 1963, experiments were conducted at Clean Slate Sites 1, 2, and 3 to study the effectiveness of earth-covered structures for reducing the dispersion of nuclear weapons material as a result of nonnuclear explosions. The experiments required the detonation of various simulated weapons using conventional chemical explosives (Shreve, 1964). The residual radioactive contamination in the surface soil consists of weapons grade plutonium, depleted uranium, and their radioactive decay products.

NONE

1997-06-01T23:59:59.000Z

372

Advanced Manufacturing Office: Industrial Assessment Centers (IACs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Assessment Industrial Assessment Centers (IACs) to someone by E-mail Share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Facebook Tweet about Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Twitter Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Google Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Delicious Rank Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Digg Find More places to share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on AddThis.com... Industrial Assessment Centers (IACs) Learn More Learn how companies have benefited from IAC assessments. Search the IAC Database for recommendations and savings achieved.

373

TMCC WIND RESOURCE ASSESSMENT  

DOE Green Energy (OSTI)

North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

Turtle Mountain Community College

2003-12-30T23:59:59.000Z

374

Resource assessment methodologies and applications  

Science Conference Proceedings (OSTI)

Resource assessment refers to the estimation and evaluation of mineral materials in the ground, both discovered and undiscovered. In such as an assessment, attention is centered on materials in such form, concentration, and location that they might be extractable under foreseeable economic and technological conditions. In practical terms, there is no such thing as an all-purpose resource assessment. Diverse groups of people interested in such assessments, be they mineral exploration planners, economic analysts, land use planners, or policymakers, will look for aspects that are most pertinent to their own field and time frame of interest. For example, exploration analysts would be most interested in the geological potential for discovering certain types of deposits in a region; mining engineers in the physical and chemical characteristics of deposits already discovered; and economists in the possible mineral-supply stream that might be generated in the future. No single assessment can throw light on all aspects of conceivable interest, and every type of assessment will have its conceptual and analytical limitations. Six major resource assessment methodologies are presented: areal value, crustal abundance, volumetric, deposit modeling, Delphi, and intergrated synthesis. Each methodology has certain strengths and weaknesses and type of resource estimate, factos which must be considered before application of any one technique. Each of these methods is discussed.

Dorian, J.P.; Zwartendyk, J.

1984-01-01T23:59:59.000Z

375

Criteria for assessing the quality of nuclear probabilistic risk assessments  

E-Print Network (OSTI)

The final outcome of a nuclear Probabilistic Risk Assessment (PRA) is generally inaccurate and imprecise. This is primarily because not all risk contributors are addressed in the analysis, and there are state-of-knowledge ...

Zhu, Yingli, 1976-

2004-01-01T23:59:59.000Z

376

DOE/EA-1497: Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Intake Pipeline Replacement Project, Cameron and Calcasieu Parishes, Louisiana (8/31/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FINDING OF NO SIGNIFICANT IMPACT RAW WATER INTAKE PIPELINE REPLACEMENT STRATEGIC PETROLEUM RESERVE WEST HACKBERRY FACILITY AGENCY: Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of

377

Viability Assessment Volume 4  

SciTech Connect

Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

DOE

1998-12-01T23:59:59.000Z

378

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

379

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

380

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network (OSTI)

Improved system efficiency can contribute to an industrial facilitys bottom line and also improve reliability and better utilize assets. Despite these opportunities, many industrial facilities continue to have unrealized system optimization potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems for consumers in determining the relative quality of assessment service offerings. Achieving certification for energy efficiency will require industrial facilities to document a specified reduction in energy intensity. Application of System Assessment Standards will offer industrial facilities seeking certification a well-defined path toward improved energy intensity. System Assessment Standards will help define the market for both users and providers of industrial system assessment services. Use of these standards will provide assurance that a particular assessment represents a recognized threshold for accuracy and completeness. The goal is a significant increase in system energy efficiency improvements in U.S. industry.

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Assessing the local windfield with instrumentation  

DOE Green Energy (OSTI)

This report concerns the development and testing of a technique for the initial screening and evaluation of potential sites for wind-energy conversion systems (WECS). The methodology was developed through a realistic siting exercise. The siting exercise involved measurements of winds along the surface and winds aloft using a relatively new instrument system, the Tethered Aerodynamic Lifting Anemometer (TALA) kite; notation of ecological factors such as vegetation flagging, soil erosion and site exposure, and verification of an area best suited for wind-energy development by establishing and maintaining a wind monitoring network. The siting exercise was carried out in an approximately 100-square-mile region of the Tehachapi Mountains of Southern California. The results showed that a comprehensive site survey involving field measurements, ecological survey, and wind-monitoring can be an effective tool for preliminary evaluation of WECS sites.

Zambrano, T.G.

1980-10-01T23:59:59.000Z

382

SunShot Initiative: Solar Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Resource Assessment to Solar Resource Assessment to someone by E-mail Share SunShot Initiative: Solar Resource Assessment on Facebook Tweet about SunShot Initiative: Solar Resource Assessment on Twitter Bookmark SunShot Initiative: Solar Resource Assessment on Google Bookmark SunShot Initiative: Solar Resource Assessment on Delicious Rank SunShot Initiative: Solar Resource Assessment on Digg Find More places to share SunShot Initiative: Solar Resource Assessment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards Balance of Systems

383

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Print E-mail Overview Print E-mail Below you will find answers to the most frequently asked questions about the First National Climate Assessment Report. alt Goal and Architecture Organization and Mandate Regions Sectors Synthesis Report Scenarios Relationship to Other Activities Goal and Architecture What was the goal of the First National Assessment? The overall goal of the National Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the public, the environment, and the nation's resources. Special efforts were made to involve the end users - such as water resource managers, farmers, and decisionmakers - in all stages of the Assessment so that the final outcome was useful to the widest audience possible and was truly developed through a participatory process.

384

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment Documents Risk Assessment Documents Y-12 RA Graphic Results Y-12 Baseline Risk Assessment Results Y-12 Screening Risk Assessment Results Bullet Graphic Risk Results Arrow Bear Creek Valley Maps Residential Landuse Groundwater - Total Hazard (range: 1 - 900) Groundwater - Total Hazard (range: 0.1 - 1) Groundwater - Total Risk (range: 10-4 - 1) Groundwater - Total Risk (range: 10-5 - 10-4) Groundwater - Total Risk (range: 10-6 - 10-5) Groundwater - Dichloroethane, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Risk Groundwater - Dichloroethane, 1,2- Risk Groundwater - Dichloroethene, 1,2- Hazard Groundwater - Nitrate Hazard Groundwater - Radium Risk Groundwater - Technetium-99 Risk Groundwater - Tetrachloroethene Hazard Groundwater - Tetrachloroethene Risk

385

NREL: Energy Analysis: Resource Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Assessment Resource Assessment NREL has developed maps and tools to conduct renewable energy resource assessments at the state, national and international level. Around the world, interest is growing in renewable energy as a strategy to mitigate greenhouse gas emissions and increase energy security. The starting point for new renewable energy projects is a characterization of the renewable resources available across a region, a resource assessment. NREL uses geospatial data sets to identify regions that are appropriate for renewable development and those that should be excluded such as water bodies, urban areas, cropland, forests, very steep terrain, and protected areas. Once resource data are available for a region, NREL can estimate the theoretical potential, or upper limit, for renewable energy in an area.

386

Second National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Print E-mail alt An affiliated website was created specifically for the 2009 National Climate Assessment so that the report would be more accessible to a variety of interested...

387

Fort Carson Wind Resource Assessment  

DOE Green Energy (OSTI)

This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

Robichaud, R.

2012-10-01T23:59:59.000Z

388

Probabilistic Risk Assessment - A Bibliography  

Science Conference Proceedings (OSTI)

Probabilistic risk analysis is an integration of failure modes and effects analysis (FEMA), fault tree analysis and other techniques to assess the potential for failure and to find ways to reduce risk. This bibliography references 160 documents in the ...

Program NASA Scientific and Technical Information

2000-07-01T23:59:59.000Z

389

Fiscal Year 2012 Revegetation Assessment  

Science Conference Proceedings (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

390

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the...

391

Environmental Design Space model assessment  

E-Print Network (OSTI)

The Environmental Design Space (EDS) is a multi-disciplinary design tool used to explore trade-offs among aircraft fuel burn, emissions, and noise. This thesis uses multiple metrics to assess an EDS model of a Boeing 777 ...

Spindler, Phillip Michael

2007-01-01T23:59:59.000Z

392

Assessing Cloud-Phase Conditions  

Science Conference Proceedings (OSTI)

In situ microphysics measurements made during the First and Third Canadian Freezing Drizzle Experiments (CFDE I and III, respectively) have been used to assess the relative responses to ice and liquid hydrometeors for several common instruments. ...

Stewart G. Cober; George A. Isaac; Alexei V. Korolev; J. Walter Strapp

2001-11-01T23:59:59.000Z

393

Guam Initial Technical Assessment Report  

SciTech Connect

Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

2011-04-01T23:59:59.000Z

394

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well developed asset management implementation. Consequently an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in a risk assessment process. However, most proposed power delivery equipment risk models require for their successful application some probabilistic representation describing the chances of equipment ...

2012-12-14T23:59:59.000Z

395

Equipment Risk and Performance Assessment  

Science Conference Proceedings (OSTI)

Risk assessment and management are key elements in a well-developed asset management implementation. Consequently, an increasing number of utility managers are devoting resources to the task of improving their capabilities for risk-based decision making. Equipment risk models are essential elements in the risk assessment process. However, for their application, most proposed power delivery equipment risk models require some probabilistic representation describing the chances of equipment failure. This re...

2011-12-21T23:59:59.000Z

396

Steam Generator Integrity Assessment Guidelines  

Science Conference Proceedings (OSTI)

This report provides guidance for evaluating the condition of steam generator (SG) tubes based on nondestructive examination (NDE) or in situ pressure testing. This integrity assessment is normally performed during a reactor refueling outage. Nuclear power plant licensees who follow this document's guidelines will have satisfied their requirements for condition monitoring and operational assessment as defined in the Nuclear Energy Institute (NEI) initiative, Steam Generator Program Guidelines, NEI 97-06.

2006-07-25T23:59:59.000Z

397

EA-1488: Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

398

EA-1853: Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT DOE/EA-1853 PERRIN RANCH WIND ENERGY INTERCONNECTION PROJECT COCONINO COUNTY, ARIZONA Prepared for U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457 Phoenix, Arizona 85005 Prepared by SWCA Environmental Consultants 3033 North Central Avenue, Suite 145 Phoenix, Arizona 85012 (602) 274-3831 www.swca.com July 2011 July 2011 i CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 1 1. INTRODUCTION ................................................................................................................................ 1 1.1 BACKGROUND .......................................................................................................................... 1

399

Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment  

Science Conference Proceedings (OSTI)

To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

NONE

1997-04-01T23:59:59.000Z

400

Geothermal resource assessment of Canon City, Colorado Area  

DOE Green Energy (OSTI)

In 1979 a program was initiated to fully define the geothermal conditions of an area east of Canon City, bounded by the mountains on the north and west, the Arkansas River on the south and Colorado Highway 115 on the east. Within this area are a number of thermal springs and wells in two distinct groups. The eastern group consists of 5 thermal artesian wells located within one mile of Colorado Highway 115 from Penrose on the north to the Arkansas river on the south. The western group, located in and adjacent to Canon City, consists of one thermal spring on the south bank of the Arkansas River on the west side of Canon City, a thermal well in the northeast corner of Canon City, another well along the banks of Four Mile Creek east of Canon City and a well north of Canon City on Four Mile Creek. All the thermal waters in the Canon City Embayment, of which the study area is part of, are found in the study area. The thermal waters unlike the cold ground waters of the Canon City Embayment, are a calcium-bicarbonate type and range in temperature from 79 F (26 C) to a high of 108 F (42 C). The total combined surface discharge o fall the thermal water in the study area is in excess of 532 acre feet (A.F.) per year.

Zacharakis, Ted G.; Pearl, Richard Howard

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

402

Assessing Energy Impact of Plug-In Hybrid Electric Vehicles: Significance of Daily Distance Variation over Time and Among Drivers  

Science Conference Proceedings (OSTI)

Accurate assessment of the impact of plug-in hybrid electric vehicles (PHEVs) on petroleum and electricity consumption is a necessary step toward effective policies. Variations in daily vehicle miles traveled (VMT) over time and among drivers affect PHEV energy impact, but the significance is not well understood. This paper uses a graphical illustration, a mathematical derivation, and an empirical study to examine the cause and significance of such an effect. The first two methods reveal that ignoring daily variation in VMT always causes underestimation of petroleum consumption and overestimation of electricity consumption by PHEVs; both biases increase as the assumed PHEV charge-depleting (CD) range moves closer to the average daily VMT. The empirical analysis based on national travel survey data shows that the assumption of uniform daily VMT over time and among drivers causes nearly 68% underestimation of expected petroleum use and nearly 48% overestimation of expected electricity use by PHEVs with a 40-mi CD range (PHEV40s). Also for PHEV40s, consideration of daily variation in VMT over time but not among drivers similar to the way the utility factor curve is derived in SAE Standard SAE J2841 causes underestimation of expected petroleum use by more than 24% and overestimation of expected electricity use by about 17%. Underestimation of petroleum use and overestimation of electricity use increase with larger-battery PHEVs.

Lin, Zhenhong [ORNL; Greene, David L [ORNL

2012-01-01T23:59:59.000Z

403

Membrane-Based Air Composition Control for Light-Duty Diesel Vehicles: A Benefit and Cost Assessment  

DOE Green Energy (OSTI)

This report presents the methodologies and results of a study conducted by Argonne National Laboratory (Argonne) to assess the benefits and costs of several membrane-based technologies. The technologies evaluated will be used in automotive emissions-control and performance-enhancement systems incorporated into light-duty diesel vehicle engines. Such engines are among the technologies that are being considered to power vehicles developed under the government-industry Partnership for a New Generation of Vehicles (PNGV). Emissions of nitrogen oxides (NO{sub x}) from diesel engines have long been considered a barrier to use of diesels in urban areas. Recently, particulate matter (PM) emissions have also become an area of increased concern because of new regulations regarding emissions of particulate matter measuring 2.5 micrometers or less (PM{sub 2.5}). Particulates are of special concern for diesel engines in the PNGV program; the program has a research goal of 0.01 gram per mile (g/mi) of particulate matter emissions under the Federal Test Procedure (FTP) cycle. This extremely low level (one-fourth the level of the Tier II standard) could threaten the viability of using diesel engines as stand-alone powerplants or in hybrid-electric vehicles. The techniques analyzed in this study can reduce NO{sub x} and particulate emissions and even increase the power density of the diesel engines used in light-duty diesel vehicles.

K. Stork; R. Poola

1998-10-01T23:59:59.000Z

404

Environmental assessment for the proposed CMR Building upgrades at the Los Alamos National Laboratory, Los Alamos, New Mexico. Final document  

Science Conference Proceedings (OSTI)

In order to maintain its ability to continue to conduct uninterrupted radioactive and metallurgical research in a safe, secure, and environmentally sound manner, the US Department of Energy (DOE) proposes to upgrade the Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Building. The building was built in the early 1950s to provide a research and experimental facility for analytical chemistry, plutonium and uranium chemistry, and metallurgy. Today, research and development activities are performed involving nuclear materials. A variety of radioactive and chemical hazards are present. The CMR Building is nearing the end of its original design life and does not meet many of today`s design codes and standards. The Proposed Action for this Environmental Assessment (EA) includes structural modifications to some portions of the CMR Building which do not meet current seismic criteria for a Hazard Category 2 Facility. Also included are upgrades and improvements in building ventilation, communications, monitoring, and fire protection systems. This EA analyzes the environmental effects of construction of the proposed upgrades. The Proposed Action will have no adverse effects upon agricultural and cultural resources, wetlands and floodplains, endangered and threatened species, recreational resources, or water resources. The Proposed Action would have negligible effects on human health and transportation, and would not pose a disproportionate adverse health or environmental impact on minority or low-income populations within an 80 kilometer (50 mile) radius of the CMR Building.

NONE

1997-02-04T23:59:59.000Z

405

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

DOE Green Energy (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

406

Argonne National Laboratory Launches Bioenergy Assessment Tools...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Launches Bioenergy Assessment Tools Argonne National Laboratory Launches Bioenergy Assessment Tools September 30, 2013 - 4:00pm Addthis A researcher...

407

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 1993 30, 1993 EA-0921: Final Environmental Assessment Ambulatory Research and Education Center, Oregon Health Sciences University July 1, 1993 EA-0847: Final Environmental Assessment Live Fire Range at the Central Training Academy, Albuquerque, New Mexico June 25, 1993 EA-0841: Final Environmental Assessment Import of Russian Plutonium-238 June 3, 1993 EA-0923: Final Environmental Assessment Winnett School District Boiler Replacement Project June 1, 1993 EA-0792: Final Environmental Assessment Nonnuclear Consolidation Environmental Assessment April 2, 1993 EA-0822: Final Environmental Assessment Idaho National Engineering Laboratory Consolidated Transportation Facility January 29, 1993 EA-0688: Final Environmental Assessment Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

408

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC) Print E-mail National Climate Assessment and Development Advisory Committee (NCADAC) pdf | html A Notice by...

409

National Climate Assessment and Development Advisory Committee...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Climate Assessment and Development Advisory Committee (NCADAC); Notice of Open Meeting (6122013) Print E-mail National Climate Assessment and Development Advisory...

410

Problem Formulations for Ecological Risk Assessments Conducted...  

NLE Websites -- All DOE Office Websites (Extended Search)

- deformities, fin erosion, lesions, and tumors ERA - ecological risk assessment HHRA - human health risk assessments ow K - octanol-water partition coefficients oc K - organic...

411

Solar Schools Assessment and Implementation Project: Financing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options...

412

Supplemental Guidance for Assessing Susceptibility from Early...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment, ORD Michael P. Firestone, Office of Children's Health Protection, OA Lynn Flowers, National Center for Environmental Assessment, ORD R. Woodrow Setzer,...

413

Independent Oversight Assessment , Idaho National Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment , Idaho National Laboratory Site - May 2010 Independent Oversight Assessment , Idaho National Laboratory Site - May 2010 May 2010 Environmental Monitoring at the Idaho...

414

EA-1533: Floodplain Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1533: Floodplain Assessment Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas This environmental assessment (EA) provides sufficient...

415

Natural Resource Damages Assessment | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Council Report Calls for Official Natural Resource Damage Assessment for LANL NRDA PreAssessment Screen, January 2010 Factsheet: Los Alamos National Laboratory...

416

Assess the U.S. Climate  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment (NCA). The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. The Assessment: Informs the...

417

Environmental Compliance Audit & Assessment Program Manual  

E-Print Network (OSTI)

Audit & Assessment Program Manual C-5 Appendix C. ExamplesAudit & Assessment Program Manual Prepared by: Environment,1 Original Issue All Rename manual; allow for internal and

Thorson, Patrick

2009-01-01T23:59:59.000Z

418

Industrial Assessment Centers Help Students, Communities Learn...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency Industrial Assessment Centers Help Students, Communities Learn About Energy Efficiency March...

419

Training Needs Assessment Training | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Needs Assessment Training Training Needs Assessment Training The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's...

420

EA-1859: Floodplain Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9: Floodplain Assessment EA-1859: Floodplain Assessment Kirkwood Community College Wind Energy Facility Kirkwood Community College in Cedar Rapids, Iowa is proposing the...

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Qualitative methods for assessing risk  

SciTech Connect

The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

Mahn, J.A. [Sandia National Labs., Albuquerque, NM (United States); Hannaman, G.W. [Science Applications International Corp., San Diego, CA (United States); Kryska, P. [Science Applications International Corp., Albuquerque, NM (United States)

1995-04-01T23:59:59.000Z

422

Guidelines for Ecological Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

5/002F 5/002F April 1998 Guidelines for Ecological Risk Assessment (Published on May 14, 1998, Federal Register 63(93):26846-26924) Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. NOTICE This report contains the full text of the Guidelines for Ecological Risk Assessment. However, the format of this version differs from the Federal Register version, as follows: text boxes that are included in this document at their point of reference were instead listed at the end of the Federal Register document as text notes, due to format limitations for Federal Register documents.

423

Impact Assessments | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Assessments Impact Assessments Impact Assessments PIA Template with Guidance (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf) DOE Jobs Online (Hiring Management) (pdf) FORM EIA 457-A/G Residential Energy Consumption Survey (pdf) Office of Hearings and Appeals (OHA) Tracking System (pdf) Corporate Human Resources Information System (CHRIS) (pdf) Energy Inspector General Project Tracking System (EIGPT) (pdf) Electronic DOE Information Security System (eDISS) (pdf)

424

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphic Results Graphic Results Baseline Risk Assessment Results Screening Risk Assessment Results Other Risk Assessment Results Graphic Results K-25 Groundwater Residential Landuse Bedrock Wells - Total Hazard (range: 1-30) Bedrock Wells - Total Hazard (range: 0.1 - 1) Bedrock Wells - Total Risk Bedrock Wells - Arsenic Risk Bedrock Wells - Dichloroethene, 1,1- Risk Bedrock Wells - Trichloroethene Risk Unconsolidated Wells - Total Hazard (range: 1-150) Unconsolidated Wells - Total Hazard (range: 0.1 - 1) Unconsolidated Wells - Total Risk (range:10-4 - 1) Unconsolidated Wells - Total Risk (range:10-6 - 10-4) Unconsolidated Wells - Arsenic Risk Unconsolidated Wells - Trichloroethene Risk ORNL WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk

425

Ion exchange technology assessment report  

SciTech Connect

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-12-31T23:59:59.000Z

426

SRS Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

427

resource assessment | OpenEI  

Open Energy Info (EERE)

resource assessment resource assessment Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago) Date Updated Unknown Keywords Feasibility Study resource assessment Solar Energy SWERA Bangladesh Wind Energy Data application/pdf icon swera_bangladesh_fullreport.pdf (pdf, 2.7 MiB)

428

Geothermal resource assessment of the Animas Valley, Colorado. Resource Series 17  

DOE Green Energy (OSTI)

The Colorado Geological Survey, has been engaged in assessing the nature and extent of Colorado's geothermal resources. The program has included geologic and hydrogeologic reconnaissance, and geophysical and geochemical surveys. In the Animas Valley, in southwestern Colorado, two groups of thermal springs exist: Pinkerton Springs to the north, and Tripp-Trimble-Stratten Springs about 5 miles (8.1 Km) south of Pinkerton. The geothermal resources of the Animas Valley were studied. Due to terrain problems in the narrow valley, a soil mercury survey was conducted only at Tripp-Trimble Stratten, while an electrical D.C. resistivity survey was limited to the vicinity of Pinkerton. Although higher mercury values tended to be near a previously mapped fault, the small extent of the survey ruled out conclusive results. Consistent low resistivity zones interpreted from the geophysical data were mapped as faults near Pinkerton, and compared well with aerial photo work and spring locations. This new information was added to reconnaissance geology and hydrogeology to provide several clues regarding the geothermal potential of the valley. Hydrothermal minerals found in faults in the study area are very similar to ore mined in a very young mountain range, nearby. Groundwater would not need to circulate very deeply along faults to attain the estimated subsurface temperatures present in the valley. The water chemistry of each area is unique. Although previously incompletely manned, faulting in the area is extensive. The geothermal resources in the Animas Valley are fault controlled. Pinkerton and Tripp-Trimble-Stratten are probably not directly connected systems, but may have the same source at distance. Recharge to the geothermal system comes from the needle and La Plata Mountains, and the latter may also be a heat source. Movement of the thermal water is probably primarily horizontal, via the Leadville Limestone aquifer.

McCarthy, K.P.; Zacharakis, T.G.; Ringrose, C.D.

1982-01-01T23:59:59.000Z

429

Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1  

SciTech Connect

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

Not Available

1993-08-01T23:59:59.000Z

430

Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site  

Science Conference Proceedings (OSTI)

This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as Attachment 1.

N /A

2003-04-23T23:59:59.000Z

431

A total risk assessment methodology for security assessment.  

Science Conference Proceedings (OSTI)

Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

2009-06-01T23:59:59.000Z

432

Advanced Network Toolkit for Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Toolkit for Assessments Network Toolkit for Assessments and Remote Mapping (ANTFARM) Uses existing information to passively map control systems networks and identify cyber security perimeters Control systems operators require a map of their energy control system network in order to identify its electronic security perimeter, critical to meeting the North American Electric Reliability Corporation's (NERC) Critical Infrastructure Protection (CIP) standards. However, purchasing active, online scanning tools specifically for network mapping can be costly, and these tools can disrupt control system function, causing system latency and possibly affecting power supply. The ANTFARM software tool enables system operators to remotely and

433

Spent Fuel Transportation Risk Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Transportation Risk Assessment Fuel Transportation Risk Assessment (SFTRA) Draft NUREG-2125 Overview for National Transportation Stakeholders Forum John Cook Division of Spent Fuel Storage and Transportation 1 SFTRA Overview Contents * Project and review teams * Purpose and goals * Basic methodology * Improvements relative to previous studies * Draft NUREG structure and format * Routine shipment analysis and results * Accident condition analysis and results * Findings and conclusions * Schedule 2 SFTRA Research and Review Teams * Sandia National Laboratory Research Team [$1.8M; 9/06-9/12] - Doug Ammerman - principal investigator - Carlos Lopez - thermal - Ruth Weiner - RADTRAN * NRC's SFTRA Technical Review Team - Gordon Bjorkman - structural

434

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

435

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

436

Video systems for alarm assessment  

SciTech Connect

The purpose of this NUREG is to present technical information that should be useful to NRC licensees in designing closed-circuit television systems for video alarm assessment. There is a section on each of the major components in a video system: camera, lens, lighting, transmission, synchronization, switcher, monitor, and recorder. Each section includes information on component selection, procurement, installation, test, and maintenance. Considerations for system integration of the components are contained in each section. System emphasis is focused on perimeter intrusion detection and assessment systems. A glossary of video terms is included. 13 figs., 9 tabs.

Greenwoll, D.A.; Matter, J.C. (Sandia National Labs., Albuquerque, NM (United States)); Ebel, P.E. (BE, Inc., Barnwell, SC (United States))

1991-09-01T23:59:59.000Z

437

Health impact assessment in Korea  

Science Conference Proceedings (OSTI)

Recently, Health Impact Assessment has gained great attention in Korea. First, the Ministry of Environment introduced HIA within existing Environment Impact Assessment. Second, the Korea Institute for Health and Social Affairs began an HIA program in 2008 in alliance with Healthy Cities. In this short report, these two different efforts are introduced and their opportunities and challenges discussed. We believe these two approaches complement each other and both need to be strengthened. We also believe that both can contribute to the development of health in policy and project development and ultimately to improvements in the Korean population's health.

Kang, Eunjeong, E-mail: marchej@kihasa.re.r [Division for Health Promotion Research, Korea Institute for Health and Social Affairs, 268 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu, Seoul (Korea, Republic of); Lee, Youngsoo, E-mail: leeys@kei.re.k [Centre for Environmental Impact Assessment Review, Korea Environment Institute, 290 Jinheung-ro, Bulgwang-dong, Eunpyeong-gu (Korea, Republic of); Harris, Patrick, E-mail: Patrick.harris@unsw.edu.a [Centre for Health Equity Training, Research and Evaluation, part of the UNSW, Research Centre for Primary Health Care and Equity, UNSW, Locked Mail Bag 7103, Liverpool BC, NSW 1981 (Australia); Koh, Kwangwook, E-mail: kwkoh@hanafos.co [Department of Preventive Medicine, Kosin University, 149-1 Dongsam-1-dong, Youngdo-gu, Busan (Korea, Republic of); Kim, Keonyeop, E-mail: pmkky@knu.ac.k [Department of Preventive Medicine, School of Medicine and Department of Public Health, Graduate School of Public Health, KyungPook National University, 101 Dongin 2 , Jung-gu, Daegu (Korea, Republic of)

2011-07-15T23:59:59.000Z

438

Adaptive capacity and its assessment  

SciTech Connect

This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

Engle, Nathan L.

2011-04-20T23:59:59.000Z

439

EA-0931: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment EA-0931: Final Environmental Assessment Center for Molecular Electronics University of Missouri, St. Louis This Environmental Assessment...

440

Assessing Energy Resources Webinar Presentation Slides  

Energy.gov (U.S. Department of Energy (DOE))

Download presentation slides from the DOE Office of Indian Energy webinar on assessing energy resources.

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

442

BRITISH COLUMBIA Gully Assessment Procedure  

E-Print Network (OSTI)

strategies and #12;Gully Assessment Procedure Guidebook iv prescriptions designed to accommodate resource).........................................................15 Section 5 Fan Destabilization Potential OPR 37 (1)(c), WLFMR 64 (2)(a......................................30 3. Design and construction of roads across gully systems: when to consult a qualified registered

443

State Energy Data Needs Assessment  

Reports and Publications (EIA)

This report responds to Section 805(d) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-140, requiring the Energy InformationAdministration to assess State-level energy data needs and submit to Congress a plan to address those needs.

Information Center

2009-01-01T23:59:59.000Z

444

Mexico Wind Resource Assessment Project  

Science Conference Proceedings (OSTI)

A preliminary wind energy resource assessment of Mexico that produced wind resource maps for both utility-scale and rural applications was undertaken as part of the Mexico-U.S. Renewable Energy Cooperation Program. This activity has provided valuable information needed to facilitate the commercialization of small wind turbines and windfarms in Mexico and to lay the groundwork for subsequent wind resource activities. A surface meteorological data set of hourly data in digital form was utilized to prepare a more detailed and accurate wind resource assessment of Mexico than otherwise would have been possible. Software was developed to perform the first ever detailed analysis of the wind characteristics data for over 150 stations in Mexico. The hourly data set was augmented with information from weather balloons (upper-air data), ship wind data from coastal areas, and summarized wind data from sources in Mexico. The various data were carefully evaluated for their usefulness in preparing the wind resource assessment. The preliminary assessment has identified many areas of good-to-excellent wind resource potential and shows that the wind resource in Mexico is considerably greater than shown in previous surveys.

Schwartz, M.N.; Elliott, D.L.

1995-05-01T23:59:59.000Z

445

Transformer Efficiency Assessment - Okinawa, Japan  

Science Conference Proceedings (OSTI)

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of key transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturers factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCBs actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-08-01T23:59:59.000Z

446

Transformer Efficiency Assessment - Okinawa, Japan  

SciTech Connect

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of key transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturers factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCBs actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

2012-05-01T23:59:59.000Z

447

Guidelines for Carcinogen Risk Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

P-03/001F P-03/001F March 2005 Guidelines for Carcinogen Risk Assessment Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1. PURPOSE AND SCOPE OF THE GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2. ORGANIZATION AND APPLICATION OF THE GUIDELINES . . . . . . . . . . . 1-3 1.2.1. Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.2. Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1.3. KEY FEATURES OF THE CANCER GUIDELINES .

448

Thoughts on Hazard Assessment (Oct)  

NLE Websites -- All DOE Office Websites (Extended Search)

Hazard Assessment of Chemical Air Hazard Assessment of Chemical Air Contaminants Measured in Residences J.M. Logue, T.E. McKone, M. H. Sherman, B.C. Singer Environmental Energy Technologies Division June 2010 Funding was provided by the U.S. Dept. of Energy Building Technologies Program, Office of Energy Efficiency and Renewable Energy under DOE Contract No. DE-AC02-05CH11231; by the U.S. Dept. of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control through Interagency Agreement I-PHI-01070, and by the California Energy Commission through Contract 500-08-06. LBNL Report Number 3650-E 1 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States

449

Winter Fuels Market Assessment 2000  

Gasoline and Diesel Fuel Update (EIA)

September 13, 2000 September 13, 2000 Winter Fuels Market Assessment 2000 09/14/2000 Click here to start Table of Contents Winter Fuels Market Assessment 2000 West Texas Intermediate Crude Oil Prices Perspective on Real Monthly World Oil Prices, 1976 - 2000 U.S. Crude Oil Stocks Total OECD Oil Stocks Distillate and Spot Crude Oil Prices Distillate Stocks Expected to Remain Low Distillate Stocks Are Important Part of East Coast Winter Supply Consumer Winter Heating Oil Costs Natural Gas Prices: Well Above Recent Averages Annual Real Natural Gas Prices by Sector End-of-Month Working Gas in .Underground Storage Residential Prices Do Not Reflect the Volatility Seen in Wellhead Prices Consumer Natural Gas Heating Costs Winter Weather Uncertainty Author: John Cook Email: jcook@eia.doe.gov

450

Hanford Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment for Medical Surveillance of Needs Assessment for Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

451

SITEWIDE ENVIRONMENTAL ASSESSMENT EA-1008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT EA-1008 for CONTINUED DEVELOPMENT OF NAVAL PETROLEUM RESERVE NO. 3 WR-3) Natrona County, Wyoming Prepared For U.S. Department of Energy Casper, Wyoming July 1995 OISTRIBUTION OF THIS DOCUMENT is UNLIMITED& i Portions of this document be illegible in electronic image products. Images are produced from the best available original dOCUIIlent, c AGENCY: ACTION: DEPARTMENT OF ENERGY Continued Development - Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Continued Development of Naval Petroleum Reserve No. 3 (DOE/EA-1008) SUMMARY: The Secretary of Energy is required by law to "explore, prospect, conserve, develop, use, and operate" the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum

452

Assessment of Project Management Experience  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Applicant Name: Applicant Supervisor: Date (mm/dd/yyyy): Directions: Step 1: Use this template to show project management experience for CEG competency 1.12.2. Rate your experience (0 - 5) in the following project management related activities using the scale below. Step 2: Sign the completed form and have your supervisor review and sign it. Step 3: Once approved by your supervisor, submit the form as part of your Level I certification package. Note: Project management experience is distinguished from FPD experience and applies to general project management activities and experience. Positions that do not count towards experience in project management include: program manager, property manager, health, safety and security (HSS) positions, and

453

INEEL Production Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Engineering and Environmental Laboratory Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures Appendix C: High Exposure Ranking Matrix

454

INEEL Production Workers Needs Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Surveillance Program Surveillance Program at Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures

455

Mongolia wind resource assessment project  

DOE Green Energy (OSTI)

The development of detailed, regional wind-resource distributions and other pertinent wind resource characteristics (e.g., assessment maps and reliable estimates of seasonal, diurnal, and directional) is an important step in planning and accelerating the deployment of wind energy systems. This paper summarizes the approach and methods being used to conduct a wind energy resource assessment of Mongolia. The primary goals of this project are to develop a comprehensive wind energy resource atlas of Mongolia and to establish a wind measurement program in specific regions of Mongolia to identify prospective sites for wind energy projects and to help validate some of the wind resource estimates. The Mongolian wind resource atlas will include detailed, computerized wind power maps and other valuable wind resource characteristic information for the different regions of Mongolia.

Elliott, D.; Chadraa, B.; Natsagdorj, L.

1998-09-07T23:59:59.000Z

456

Metal-air battery assessment  

DOE Green Energy (OSTI)

The objective of this report is to evaluate the present technical status of the zinc-air, aluminum/air and iron/air batteries and assess their potential for use in an electric vehicle. In addition, this report will outline proposed research and development priorities for the successful development of metal-air batteries for electric vehicle application. 39 refs., 25 figs., 11 tabs.

Sen, R.K.; Van Voorhees, S.L.; Ferrel, T.

1988-05-01T23:59:59.000Z

457

Applications of Probabilistic Risk Assessment  

SciTech Connect

This report provides a summary of potential and actual applications of Probabilistic Risk Assessment (PRA) technology and insights. Individual applications are derived from the experiences of a number of US nuclear utilities. This report identifies numerous applications of PRA techniques beyond those typically associated with PRAs. In addition, believing that the future use of PRA techniques should not be limited to those of the past, areas of plant operations, maintenance, and financial resource allocation are discussed. 9 refs., 3 tabs.

Burns, K.J.; Chapman, J.R.; Follen, S.M.; O'Regan, P.J. (Yankee Atomic Electric Co., Bolton, MA (USA))

1991-05-01T23:59:59.000Z

458

NIR Inspection and Assessment Technology  

Science Conference Proceedings (OSTI)

Corrosion of the core of ACSR conductors is a key determinant of conductor life, but the detection of this condition is difficult and expensive with currently available technology. While some existing technologies hold promise for enabling a relatively accurate assessment of core wire condition, as defined as the percent remaining galvanization, the currently available techniques are time consuming and expensive. Near-Infrared (NIR) optical spectroscopy may provide a cost-effective rapid scanning techniq...

2008-12-10T23:59:59.000Z

459

Assessment of Water Balance Models  

Science Conference Proceedings (OSTI)

Power generating plants perform water balance studies for a variety of reasons, and they use a range of different modeling approaches and tools to accomplish their specific objectives. This EPRI report presents the results of a project conducted with the objective of providing the industry and the interested public with an assessment of the value of water balance models to conserve and manage water. The report provides an overview of the state-of-the-art water balance models and identifies ...

2013-10-29T23:59:59.000Z

460

Preliminary melter performance assessment report  

Science Conference Proceedings (OSTI)

The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment cheyenne-miracle mile" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Chariton Valley Biomass Project Final Environmental Assessment and Finding of No Significant Impact  

DOE Green Energy (OSTI)

Switchgrass is a warm-weather, native Iowa grass that grows well on marginal land. It has been identified and extensively studied for its potential as a biomass energy crop, especially its potential for use as co-fire feedstock in coal-burning plants. In this environmental assessment (EA), the term ''co-fire'' refers to the burning of switchgrass in the OGS boiler in conjunction with coal, with the goal of reducing the amount of coal used and reducing emissions of some objectionable air pollutants associated with coal combustion. The U.S. Department of Energy (DOE) is proposing to provide partial funding for (1) the design and construction of a biomass (switchgrass [Panicum virgatum]) storage, handling, and conveying system into the boiler at the Ottumwa Generating Station (OGS) near Chillicothe, Iowa; (2) operational testing of switchgrass as a biomass co-fire feedstock at OGS; and (3) ancillary activities related to growing, harvesting, storing, and transporting switchgrass in areas of the Rathbun Lake watershed. Chillicothe is in Wapello County on the south side of the Des Moines River, approximately 16 kilometers (10 miles) northwest of Ottumwa, Iowa, and 130 kilometers (80 miles) southeast of Des Moines. The OGS is a 725-megawatt (MW) maximum output, low-sulfur, pulverized coal-burning plant jointly owned by several Iowa utilities and operated by Alliant Energy. The plant is located about 1.6 kilometers (1 mile) northwest of Chillicothe, Iowa, on the Des Moines River. The following three-phase switchgrass co-fire test campaign has been planned and partially implemented at OGS: During Phase 1, which occurred from November 2000 through January 2001, Alliant Energy conducted Co-fire Test 1 at OGS. Phase 2 testing, the Proposed Action, would consist of two additional co-fire tests. Co-fire Test 2, which would utilize some residual equipment from Co-fire Test 1 and also test some new equipment, is currently planned for September/October 2003. It would be designed to test and demonstrate the engineering and environmental feasibility of co-firing up to 11.3 tonnes (12.5 tons) of switchgrass per hour and would burn a maximum of 5,440 tonnes (6,000 tons) of switchgrass. Co-fire Test 3, which is tentatively planned for winter 2004/2005, would test the long-term (approximately 2,000 hours) sustainability of processing 11.3 tonnes (12.5 tons) per hour. Co-fire Test 3 would be conducted using a proposed new process building and storage barn that would be constructed at the OGS as part of the Proposed Action. Phase 3, commercial operations, may occur if Phase 2 indicated that commercial operations were technically, environmentally, and economically feasible. Continuous, full-scale commercial operations could process up to 23 tonnes (25 tons) of switchgrass per hour, generate 35 MW per year of OGS's annual output, and replace 5 percent of the coal burned at OGS with switchgrass. Chariton Valley Resource Conservation and Development Inc. (Chariton Valley RC&D), a rural-development-oriented, non-profit corporation (Chariton Valley RC&D 2003a) and Alliant Energy would implement Phase 3 at their discretion after the completion of the Phase 2 co-fire tests. DOE's Proposed Action would support only Phase 2 testing; that is, Co-fire Tests 2 and 3. DOE has no plans to provide financial support for the commercial operations that would be performed during Phase 3. The new construction that DOE proposes to partially fund would include a new switchgrass processing facility and equipment and a new storage barn that would be used for Co-fire Test 3. This environmental assessment (EA) evaluates the environmental impacts that could result from the Proposed Action. It also evaluates the impacts that could occur if DOE decided not to partially fund the Proposed Action (the No Action Alternative). No other action alternatives are analyzed because (1) no generating plants other than OGS have the installed infrastructure and operating experience necessary to conduct Phase 2 co-fire testing, and (2) the Rathbun Lake watershed is the only viable

N /A

2003-07-11T23:59:59.000Z

462

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 1, 2009 January 1, 2009 EA-1611: Final Environmental Assessment Interconnection Request for the Colorado Highlands Wind Project January 1, 2009 EA 1647: Supplemental Environmental Assessment Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia December 1, 2008 EA-1643: Final Environmental Assessment 10 CFR 431 Commercial Refrigeration Equipment December 1, 2008 EA-1633: Final Environmental Assessment Green Mountain Reservoir Substitution and Power Interference Agreements December 1, 2008 EA-1624: Final Environmental Assessment Auburn Landfill Gas Electric Generators and Anaerobic Digester Energy Facilities November 3, 2008 EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection

463

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 1, 2011 February 1, 2011 EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan February 1, 2011 EA-1700: Final Environmental Assessment Computational Research and Theory Facility Project February 1, 2011 EA-1816: Final Environmental Assessment Town of Hempstead Wind-to-Hydrogen Project, Point Lookout, New February 1, 2011 EA-1815: Final Environmental Assessment Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio February 1, 2011 EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio February 1, 2011 EA-1818: Final Environmental Assessment Pettisville Local Schools Wind Energy Project, Pettisville, Fulton County,

464

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 4, 2009 September 4, 2009 EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development September 1, 2009 EA-1584: Final Environmental Assessment Sand Point Wind Installation Project Sand Point, Alaska September 1, 2009 EA-1788: Final Environmental Assessment Sapphire Energy, Inc.'s Integrated Algal Biorefinery (IABR) Facility in Columbus, New Mexico August 3, 2009 EA-1674: Final Environmental Assessment 10 CFR 431 Energy Conservation Program: Energy Conservation Standards for Refrigerated Bottled or Canned Beverage Vending Machines August 3, 2009 EA-1659: Final Environmental Assessment Proposed Demolition of Building 330 at Argonne National Laboratory August 3, 2009 EA-1652: Final Environmental Assessment

465

Vulnerability Assessment Team (VAT) - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Vulnerability Assessment Team Vulnerability Assessment Team VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms

466

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 16, 2011 August 16, 2011 EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah August 15, 2011 EA-1888: Draft Environmental Assessment Old Town Fuel and Fiber Proposed Demonstration-Scale Integrated Biorefinery August 13, 2011 EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin August 12, 2011 EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California August 1, 2011 EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI

467

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

468

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state