Powered by Deep Web Technologies
Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Broader source: Energy.gov [DOE]

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

2

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Broader source: Energy.gov (indexed) [DOE]

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

3

Study of the Acoustic Effects of Hydrokinetic Tidal Turbines in Admiralty Inlet, Puget Sound  

SciTech Connect (OSTI)

Hydrokinetic turbines will be a source of noise in the marine environment - both during operation and during installation/removal. High intensity sound can cause injury or behavioral changes in marine mammals and may also affect fish and invertebrates. These noise effects are, however, highly dependent on the individual marine animals; the intensity, frequency, and duration of the sound; and context in which the sound is received. In other words, production of sound is a necessary, but not sufficient, condition for an environmental impact. At a workshop on the environmental effects of tidal energy development, experts identified sound produced by turbines as an area of potentially significant impact, but also high uncertainty. The overall objectives of this project are to improve our understanding of the potential acoustic effects of tidal turbines by: (1) Characterizing sources of existing underwater noise; (2) Assessing the effectiveness of monitoring technologies to characterize underwater noise and marine mammal responsiveness to noise; (3) Evaluating the sound profile of an operating tidal turbine; and (4) Studying the effect of turbine sound on surrogate species in a laboratory environment. This study focuses on a specific case study for tidal energy development in Admiralty Inlet, Puget Sound, Washington (USA), but the methodologies and results are applicable to other turbine technologies and geographic locations. The project succeeded in achieving the above objectives and, in doing so, substantially contributed to the body of knowledge around the acoustic effects of tidal energy development in several ways: (1) Through collection of data from Admiralty Inlet, established the sources of sound generated by strong currents (mobilizations of sediment and gravel) and determined that low-frequency sound recorded during periods of strong currents is non-propagating pseudo-sound. This helped to advance the debate within the marine and hydrokinetics acoustic community as to whether strong currents produce propagating sound. (2) Analyzed data collected from a tidal turbine operating at the European Marine Energy Center to develop a profile of turbine sound and developed a framework to evaluate the acoustic effects of deploying similar devices in other locations. This framework has been applied to Public Utility District No. 1 of Snohomish Country's demonstration project in Admiralty Inlet to inform postinstallation acoustic and marine mammal monitoring plans. (3) Demonstrated passive acoustic techniques to characterize the ambient noise environment at tidal energy sites (fixed, long-term observations recommended) and characterize the sound from anthropogenic sources (drifting, short-term observations recommended). (4) Demonstrated the utility and limitations of instrumentation, including bottom mounted instrumentation packages, infrared cameras, and vessel monitoring systems. In doing so, also demonstrated how this type of comprehensive information is needed to interpret observations from each instrument (e.g., hydrophone data can be combined with vessel tracking data to evaluate the contribution of vessel sound to ambient noise). (5) Conducted a study that suggests harbor porpoise in Admiralty Inlet may be habituated to high levels of ambient noise due to omnipresent vessel traffic. The inability to detect behavioral changes associated with a high intensity source of opportunity (passenger ferry) has informed the approach for post-installation marine mammal monitoring. (6) Conducted laboratory exposure experiments of juvenile Chinook salmon and showed that exposure to a worse than worst case acoustic dose of turbine sound does not result in changes to hearing thresholds or biologically significant tissue damage. Collectively, this means that Chinook salmon may be at a relatively low risk of injury from sound produced by tidal turbines located in or near their migration path. In achieving these accomplishments, the project has significantly advanced the District's goals of developing a demonstration-scale tidal energy proj

Brian Polagye; Jim Thomson; Chris Bassett; Jason Wood; Dom Tollit; Robert Cavagnaro; Andrea Copping

2012-03-30T23:59:59.000Z

4

EA-1949: FERC Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. EA-1949-FERC-DEA-2013.pdf More Documents & Publications EA-1949: FERC Notice of Availability of an Environmental Assessment EA-1949: FERC Final Environmental Assessment

5

EA-1949: FERC Notice of Availability of an Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Notice of Availability of an Environmental Assessment Notice of Availability of an Environmental Assessment EA-1949: FERC Notice of Availability of an Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This Notice announces the availability of a Federal Energy Regulatory Commission (FERC) EA, which analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The FERC is the lead agency. DOE is a cooperating agency. EA-1949-FERC-EA-NOA-2013.pdf More Documents & Publications

6

A comparative assessment of alternative combustion turbine inlet air cooling system  

SciTech Connect (OSTI)

Interest in combustion turbine inlet air cooling (CTAC) has increased during the last few years as electric utilities face increasing demand for peak power. Inlet air cooling increases the generating capacity and decreases the heat rate of a combustion turbine during hot weather when the demand for electricity is generally the greatest. Several CTAC systems have been installed, but the general applicability of the concept and the preference for specific concepts is still being debated. Concurrently, Rocky Research of Boulder City, Nevada has been funded by the U.S. Department of Energy to conduct research on complex compound (ammoniated salt) chiller systems for low-temperature refrigeration applications.

Brown, D.R.; Katipamula, S.; Konynenbelt, J.H.

1996-02-01T23:59:59.000Z

7

Behavioral flexibility of feeding dusky dolphins (Lagenorhynchus obscurus) in Admiralty Bay, New Zealand  

E-Print Network [OSTI]

that frequent Admiralty Bay during winter spend their summers off Kaikoura, where they become part of an established multi-million dollar ecotourism industry (Fairweather and Simmons 1998). Currently, the impacts of ecotourism on these dolphins appear...

McFadden, Cynthia Joy

2004-09-30T23:59:59.000Z

8

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 18, 2013 February 18, 2013 EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho February 12, 2013 EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri February 1, 2013 EA-1895: Draft Environmental Assessment Lolo Creek Permanent Weir Construction near town of Weippe, Clearwater County, Idaho January 17, 2013 EA-1944: Final Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA January 15, 2013 EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the

9

Marine gas turbine evaluation and research at the admiralty test house, RAE pyestock  

SciTech Connect (OSTI)

The Admiralty Test House (ATH) at the Royal Aerospace Establishment Pyestock has provided test bed facilities for evaluation of marine gas turbines and ancillary equipments for Royal Naval use since 1952. While the ATH is presently undergoing an extensive refurbishment program in preparation for trials of the Rolls-Royce 20-MW Spey SM1C, research continues on a number of innovative gas turbine condition monitoring techniques. This paper presents a brief history of the Marine Gas Turbine Section and describes the facilities of the ATH following major refurbishment. The capabilities of the steady-state and transient data gathering facilities are outlined, together with the automated engine and test control systems, which provide cost-effective engine evaluation in both endurance and minor equipment trials.

Bruce, C.J.; Cartwright, R.A. (Royal Aerospace Establishment, Pyestock, Farnborough, Hants (GB))

1992-04-01T23:59:59.000Z

10

Design of bioaerosol sampling inlets  

E-Print Network [OSTI]

An experimental investigation involving the design, fabrication, and testing of an ambient sampling inlet and two additional Stokes-scaled inlets is presented here. Testing of each inlet was conducted at wind speeds of 2, 8, and 24 km/h (0.55, 2...

Nene, Rohit Ravindra

2007-09-17T23:59:59.000Z

11

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Broader source: Energy.gov (indexed) [DOE]

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

12

Scramjet including integrated inlet and combustor  

SciTech Connect (OSTI)

This patent describes a scramjet engine. It comprises: a first surface including an aft facing step; a cowl including: a leading edge and a trailing edge; an upper surface and a lower surface extending between the leading edge and the trailing edge; the cowl upper surface being spaced from and generally parallel to the first surface to define an integrated inlet-combustor therebetween having an inlet for receiving and channeling into the inlet-combustor supersonic inlet airflow; means for injecting fuel into the inlet-combustor at the step for mixing with the supersonic inlet airflow for generating supersonic combustion gases; and further including a spaced pari of sidewalls extending between the first surface to the cowl upper surface and wherein the integrated inlet-combustor is generally rectangular and defined by the sidewall pair, the first surface and the cowl upper surface.

Kutschenreuter, P.H. Jr.; Blanton, J.C.

1992-02-04T23:59:59.000Z

13

Preliminary evaluation of wind energy potential: Cook Inlet area, Alaska  

SciTech Connect (OSTI)

This report summarizes work on a project performed under contract to the Alaska Power Administration (APA). The objective of this research was to make a preliminary assessment of the wind energy potential for interconnection with the Cook Inlet area electric power transmission and distribution systems, to identify the most likely candidate regions (25 to 100 square miles each) for energy potential, and to recommend a monitoring program sufficient to quantify the potential.

Hiester, T.R.

1980-06-01T23:59:59.000Z

14

Fast acting inlet guide vanes  

SciTech Connect (OSTI)

A fast acting inlet guide vane (IGV) system was developed for the model Siemens V94.2 gas turbine (GT). This system enables the GT to perform larger and faster load changes in the case of electrical grid disturbances. Disturbances in electrical grids are caused by an unbalance between actual power generation and power consumption resulting in grid frequency deviations. In order to reduce such deviations, it is desirable for a GT (connected to the grid), to increase/reduce load as fast as required. This task is achieved by the fast responding IGV system: Basically, the occurring grid frequency deviation is monitored by the IGV system. Depending on this deviation, the compressor air mass flow is adapted to the changing fuel mass flow (which is set approximately proportional to the frequency deviation by the GT controller). The fast IGV actuator plays a main role in this dynamic response, allowing the vanes to open/close very fast. Tests performed on Poolbeg site (Ireland) proved safe and rapid load changes with a typical load ramp of 50 MW within 3 sec.

Minne, M.; Kull, R.

1998-07-01T23:59:59.000Z

15

Evaporation of Water from Particles in the Aerodynamic Lens Inlet...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Water from Particles in the Aerodynamic Lens Inlet: An Experimental Study. Evaporation of Water from Particles in the Aerodynamic Lens Inlet: An Experimental Study. Abstract:...

16

Sample inlet tube for ion source  

DOE Patents [OSTI]

An improved inlet tube is positioned within an aperture through the device to allow the passage of ions from the ion source, through the improved inlet tube, and into the interior of the device. The inlet tube is designed with a larger end and a smaller end wherein the larger end has a larger interior diameter than the interior diameter of the smaller end. The inlet tube is positioned within the aperture such that the larger end is pointed towards the ion source, to receive ions therefrom, and the smaller end is directed towards the interior of the device, to deliver the ions thereto. Preferably, the ion source utilized in the operation of the present invention is a standard electrospray ionization source. Similarly, the present invention finds particular utility in conjunction with analytical devices such as mass spectrometers.

Prior, David [Hermiston, OR; Price, John [Richland, WA; Bruce, Jim [Oceanside, CA

2002-09-24T23:59:59.000Z

17

An experimental investigation of flow control for supersonic inlets  

E-Print Network [OSTI]

and scramjet configurations. (a) normal shock inlet (b) external compression (c) internal compression (d) mixed compression Figure 2.5: Di?erent inlet types2.5.2 Pitot inlets The simplest supersonic inlet design arises from the use of a single shock...

Titchener, Neil

2013-07-09T23:59:59.000Z

18

Seal inlet disturbance boundary conditions for rotordynamic models and influence of some off-design conditions on labyrinth rotordynamic instability  

E-Print Network [OSTI]

the swirl slip velocity. The benefits of using the new seal-inlet boundary condition correlations were assessed by implementing them into a CFD-perturbation model. Consistently improved agreement with measurements was obtained for both liquid annular seals...

Xi, Jinxiang

2007-04-25T23:59:59.000Z

19

Coastal Inlet Model Facility | Open Energy Information  

Open Energy Info (EERE)

Inlet Model Facility Inlet Model Facility Jump to: navigation, search Basic Specifications Facility Name Coastal Inlet Model Facility Overseeing Organization United States Army Corp of Engineers (ERDC) Hydrodynamic Testing Facility Type Wave Basin Length(m) 103.6 Beam(m) 48.8 Depth(m) 0.6 Water Type Freshwater Cost(per day) Contact POC Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.2 Maximum Wave Height(m) at Wave Period(s) 2.3 Wave Period Range(s) 2.3 Current Velocity Range(m/s) 0.0 Programmable Wavemaking Yes Wave Direction Uni-Directional Simulated Beach No Channel/Tunnel/Flume Channel/Tunnel/Flume None Wind Capabilities Wind Capabilities None Control and Data Acquisition Description Automated data acquisition and control system

20

Boundary layer ingesting inlet design for a silent aircraft  

E-Print Network [OSTI]

(cont.) common nacelle, L/D ratios between 2.5 and 3.0, fan face to throat area ratios above 1.06, and offsets lower than 11%. Curvature ahead of the inlet should be avoided as well as bifurcations inside the duct. Inlet ...

Freuler, Patrick N., 1980-

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project  

SciTech Connect (OSTI)

Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project TeamLGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Scienceundertook the following U.S. Department of Energy (DOE) study to characterize beluga whales in Cook Inlet Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPCs proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the FERC pilot project process. The Project compared results obtained from this method to results obtained from other passive hydrophone technologies and to visual observation techniques performed simultaneously. This Final Report makes recommendations on the best practice for future data collection, for ORPCs work in Cook Inlet specifically, and for tidal power projects in general. This Project developed a marine mammal study design and compared technologies for hydroacoustic and visual data collection with potential for broad application to future tidal and hydrokinetic projects in other geographic areas. The data collected for this Project will support the environmental assessment of future Cook Inlet tidal energy projects, including ORPCs East Foreland Tidal Energy Project and any tidal energy developments at Fire Island. The Projects rigorous assessment of technology and methodologies will be invaluable to the hydrokinetic industry for developing projects in an environmentally sound and sustainable way for areas with high marine mammal activity or endangered populations. By combining several different sampling methods this Project will also contribute to the future preparation of a comprehensive biological assessment of ORPCs projects in Cook Inlet.

Worthington, Monty [Project Director - AK] [Project Director - AK

2014-02-05T23:59:59.000Z

22

An experimental investigation into enhancing pulsejet performance through inlet redesign  

E-Print Network [OSTI]

operation, the engine was tested in a moving flow of air. The experimental data consisted of combustion chamber pressure measurements, inlet pressure measurements and thrust measurements. The diffuser configuration successfully achieved the research...

Wood, Randolph Handley, 1967-

1994-01-01T23:59:59.000Z

23

Organics Verification Study for Sinclair and Dyes Inlets, Washington  

SciTech Connect (OSTI)

Sinclair and Dyes Inlets near Bremerton, Washington, are on the State of Washington 1998 303(d) list of impaired waters because of fecal coliform contamination in marine water, metals in sediment and fish tissue, and organics in sediment and fish tissue. Because significant cleanup and source control activities have been conducted in the inlets since the data supporting the 1998 303(d) listings were collected, two verification studies were performed to address the 303(d) segments that were listed for metal and organic contaminants in marine sediment. The Metals Verification Study (MVS) was conducted in 2003; the final report, Metals Verification Study for Sinclair and Dyes Inlets, Washington, was published in March 2004 (Kohn et al. 2004). This report describes the Organics Verification Study that was conducted in 2005. The study approach was similar to the MVS in that many surface sediment samples were screened for the major classes of organic contaminants, and then the screening results and other available data were used to select a subset of samples for quantitative chemical analysis. Because the MVS was designed to obtain representative data on concentrations of contaminants in surface sediment throughout Sinclair Inlet, Dyes Inlet, Port Orchard Passage, and Rich Passage, aliquots of the 160 MVS sediment samples were used in the analysis for the Organics Verification Study. However, unlike metals screening methods, organics screening methods are not specific to individual organic compounds, and are not available for some target organics. Therefore, only the quantitative analytical results were used in the organics verification evaluation. The results of the Organics Verification Study showed that sediment quality outside of Sinclair Inlet is unlikely to be impaired because of organic contaminants. Similar to the results for metals, in Sinclair Inlet, the distribution of residual organic contaminants is generally limited to nearshore areas already within the actively managed Puget Sound Naval Shipyard and Intermediate Maintenance Facility Superfund Site, where further source-control actions and monitoring are under way.

Kohn, Nancy P.; Brandenberger, Jill M.; Niewolny, Laurie A.; Johnston, Robert K.

2006-09-28T23:59:59.000Z

24

Contaminant Concentrations in Storm Water Entering the Sinclair/Dyes Inlet Subasin of the Puget Sound, USA, During Storm Event and Baseflow Conditions  

SciTech Connect (OSTI)

The Sinclair and Dyes Inlet watershed is located on the west side of Puget Sound in Kitsap County, Washington, U.S.A. (Figure 1). Puget Sound Naval Shipyard (PSNS), U.S Environmental Protection Agency (USEPA), the Washington State Department of Ecology (WA-DOE), Kitsap County, City of Bremerton, City of Bainbridge Island, City of Port Orchard, and the Suquamish Tribe have joined in a cooperative effort to evaluate water-quality conditions the Sinclair-Dyes Inlet watershed and correct identified problems. A major focus of this project, known as Project ENVVEST, is to develop Water Clean-up (TMDL) Plans for constituents listed on the 303(d) list within the Sinclair and Dyes Inlet watershed. Segments within the Sinclair and Dyes Inlet watershed were listed on the State of Washingtons 1998 303(d) due to fecal coliform contamination in marine water, metals in sediment and fish tissue, and organics in sediment and fish tissue (WA-DOE 2003). Stormwater loading was identified by ENVVEST as one potential source of sediment contamination, which lacked sufficient data for the contaminant mass balance calculations conducted for the watershed. This paper summarizes the contaminant concentrations in representative streams and outfalls discharging into Sinclair and Dyes Inlets during 18 storm events and wet/dry season baseflow conditions between November 2002 and May 2005. This paper serves as a portion of the report titled, Surface and Stormwater Quality Assessment for Sinclair and Dyes Inlet, Washington (Brandenberger et al. 2007).

Brandenberger, Jill M.; May, Christopher W.; Cullinan, Valerie I.; Johnston, Robert K.; Leisle, D. E.; Beckwith, B.; Sherrell, Gerald; Mettallo, David; Pingree, Ryan

2007-03-29T23:59:59.000Z

25

Laboratory Analysis of Vortex Dynamics For Shallow Tidal Inlets  

E-Print Network [OSTI]

LABORATORY ANALYSIS OF VORTEX DYNAMICS FOR SHALLOW TIDAL INLETS A Thesis by KERRI ANN WHILDEN Submitted to the O ce of Graduate Studies of Texas A&M University in partial ful llment of the requirements for the degree of MASTER OF SCIENCE August 2009... Major Subject: Ocean Engineering LABORATORY ANALYSIS OF VORTEX DYNAMICS FOR SHALLOW TIDAL INLETS A Thesis by KERRI ANN WHILDEN Submitted to the O ce of Graduate Studies of Texas A&M University in partial ful llment of the requirements for the degree...

Whilden, Kerri Ann

2010-10-12T23:59:59.000Z

26

Royalty relief, leasing, exploration may help maintain Cook Inlet production  

SciTech Connect (OSTI)

Cook Inlet production largely held its own in 1995 while Alaska`s overall oil production fell 4%. The Inlet`s seven oil fields produced 15.5 million bbl of oil, or a decline of only 0.6% from 1994`s 15.6 million bbl. Fields and their average production in 1995 compared with 1994 in parentheses, are McArthur River 18,142 b/d (19,427); Middle Ground Shoal 7.753 b/d (7,577); Granite Point 7,069 b/d (6,053); Swanson River 4,738 b/d (4,645); West McArthur River 2,526 b/d (2,522); Trading Bay 1,979 b/d (2,037); and Beaver Creek 362 b/d (383). The paper discusses Unocal`s plans, royalty relief, ARCO`s outlook, sales of Shell, explorations by Marathon, drilling by Stewart, reserves and production, and Cook Inlet leases.

NONE

1996-07-01T23:59:59.000Z

27

Tidally Generated Turbulence over the Knight Inlet Sill  

Science Journals Connector (OSTI)

Very high turbulent dissipation rates (above ? = 10?4 W kg?1) were observed in the nonlinear internal lee waves that form each tide over a sill in Knight Inlet, British Columbia. This turbulence was due to both shear instabilities and the ...

Jody M. Klymak; Michael C. Gregg

2004-05-01T23:59:59.000Z

28

Low inlet gas velocity high throughput biomass gasifier  

DOE Patents [OSTI]

The present invention discloses a novel method of operating a gasifier for production of fuel gas from carbonaceous fuels. The process disclosed enables operating in an entrained mode using inlet gas velocities of less than 7 feet per second, feedstock throughputs exceeding 4000 lbs/ft.sup.2 -hr, and pressures below 100 psia.

Feldmann, Herman F. (Worthington, OH); Paisley, Mark A. (Upper Arlington, OH)

1989-01-01T23:59:59.000Z

29

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Broader source: Energy.gov (indexed) [DOE]

FINAL ENVIRONMENTAL ASSESSMENT FINAL ENVIRONMENTAL ASSESSMENT (August 9, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year license for the proposed Admiralty Inlet Pilot Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared a final environmental assessment (FEA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the FEA, Commission staff analyzed the potential environmental effects of

30

Latest Documents and Notices | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

17, 2013 17, 2013 EA-1944: Finding of No Significant Impact Ormat Technologies Brady Hot Springs Project, Churchill County, NV January 17, 2013 EA-1944: Final Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV January 15, 2013 EIS-0413: Final Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV January 15, 2013 EA-1949: FERC Notice of Availability of an Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA January 15, 2013 EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands January 15, 2013

31

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the EA, Commission staff analyzed the potential environmental effects of constructing and

32

Numerical Analysis of Ethylene Injection in the Inlet of a Mach Six Scramjet.  

E-Print Network [OSTI]

??A scramjet inlet was designed for use on a small scale, Mach six, ethylene-fuelled vehicle. The inlet used strut-based cantilevered fuel injectors and a well-defined (more)

West, Jonathan Philip

2011-01-01T23:59:59.000Z

33

Jupiter Inlet Colony, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Jupiter Inlet Colony, Florida: Energy Resources Jupiter Inlet Colony, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.94785°, -80.074999° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.94785,"lon":-80.074999,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

34

MHK Projects/Cook Inlet Tidal Energy | Open Energy Information  

Open Energy Info (EERE)

Cook Inlet Tidal Energy Cook Inlet Tidal Energy < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":60.6893,"lon":-151.437,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

35

MHK Projects/Admirality Inlet Tidal Energy Project | Open Energy  

Open Energy Info (EERE)

Admirality Inlet Tidal Energy Project Admirality Inlet Tidal Energy Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.1169,"lon":-122.76,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

36

Properties and stability of a Texas barrier beach inlet  

E-Print Network [OSTI]

have caused the filling of the marshy lowlands near Mitchell Cut. Such depositional patterns are likely to have resulted in the requirement that a more efficient location for the exchange of bay and gulf water be established, As indicated... OP A TEXAS BARRIER BEACH INLET (August 1971) Curtis Mason, B. A. , Oregon State University; M. S. , Texas A6M University; Directed by: Dr. Robert M. Sorensen An environmental study was conducted at Brawn Cedar Cut, a natural unstable barrier...

Mason, Curtis

2012-06-07T23:59:59.000Z

37

Optimization of Fog Inlet Air Cooling System for Combined Cycle Power Plants using Genetic Algorithm  

Science Journals Connector (OSTI)

Abstract In this research paper, a comprehensive thermodynamic modeling of a combined cycle power plant is first conducted and the effects of gas turbine inlet fogging system on the first and second law efficiencies and net power outputs of combined cycle power plants are investigated. The combined cycle power plant (CCPP) considered for this study consist of a double pressure heat recovery steam generator (HRSG) to utilize the energy of exhaust leaving the gas turbine and produce superheated steam to generate electricity in the Rankine cycle. In order to enhance understanding of this research and come up with optimum performance assessment of the plant, a complete optimization is using a genetic algorithm conducted. In order to achieve this goal, a new objective function is defined for the system optimization including social cost of air pollution for the power generation systems. The objective function is based on the first law efficiency, energy cost and the external social cost of air pollution for an operational system. It is concluded that using inlet air cooling system for the CCPP system and its optimization results in an increase in the average output power, first and second law efficiencies by 17.24%, 3.6% and 3.5%, respectively, for three warm months of year.

Mehdi A. Ehyaei; Mojtaba Tahani; Pouria Ahmadi; M. Esfandiari

2014-01-01T23:59:59.000Z

38

North End Of Tenakee Inlet Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » North End Of Tenakee Inlet Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: North End Of Tenakee Inlet Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":58.03333333,"lon":-136.0166667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

39

Mass independent kinetic energy reducing inlet system for vacuum environment  

DOE Patents [OSTI]

A particle inlet system comprises a first chamber having a limiting orifice for an incoming gas stream and a micrometer controlled expansion slit. Lateral components of the momentum of the particles are substantially cancelled due to symmetry of the configuration once the laminar flow converges at the expansion slit. The particles and flow into a second chamber, which is maintained at a lower pressure than the first chamber, and then moves into a third chamber including multipole guides for electromagnetically confining the particle. The vertical momentum of the particles descending through the center of the third chamber is minimized as an upward stream of gases reduces the downward momentum of the particles. The translational kinetic energy of the particles is near-zero irrespective of the mass of the particles at an exit opening of the third chamber, which may be advantageously employed to provide enhanced mass resolution in mass spectrometry.

Reilly, Peter T.A.

2014-05-13T23:59:59.000Z

40

Mass independent kinetic energy reducing inlet system for vacuum environment  

DOE Patents [OSTI]

A particle inlet system comprises a first chamber having a limiting orifice for an incoming gas stream and a micrometer controlled expansion slit. Lateral components of the momentum of the particles are substantially cancelled due to symmetry of the configuration once the laminar flow converges at the expansion slit. The particles and flow into a second chamber, which is maintained at a lower pressure than the first chamber, and then moves into a third chamber including multipole guides for electromagnetically confining the particle. The vertical momentum of the particles descending through the center of the third chamber is minimized as an upward stream of gases reduces the downward momentum of the particles. The translational kinetic energy of the particles is near-zero irrespective of the mass of the particles at an exit opening of the third chamber, which may be advantageously employed to provide enhanced mass resolution in mass spectrometry.

Reilly, Peter T. A. [Knoxville, TN

2010-12-14T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Energy Fluxes due to the Surface and Internal Tides in Knight Inlet, British Columbia  

Science Journals Connector (OSTI)

A laterally integrated (two dimensional) nonlinear numerical model is used to examine the flux of M2 tidal energy in Knight Inlet. The simulated flux of tidal energy into the inlet is somewhat smaller than that estimated using the change in phase ...

Michael W. Stacey; S. Pond

2005-11-01T23:59:59.000Z

42

Analysis of Inlet Air Cooling for IGCC Power Augmentation  

Science Journals Connector (OSTI)

Abstract Integrated Gasification Combined Cycles are energy systems mainly composed of a gasifier and a combined cycle power plant. Since the gasification process usually requires oxygen as an oxidant, an air separation unit is also part of the plant. Moreover, a producer gas cleaner unit is always present between the gasifier and the gas turbine. With respect to Natural Gas Combined Cycles, \\{IGCCs\\} are characterized by a consistent loss in the overall plant efficiency due to the conversion of the raw fuel in the gasifier and the electrical power parasitized for fuel production which considerably reduce the plant net electric power. Moreover, since these plants are based on gas-steam combined cycle power plants they suffer from a reduction in performance (a further net power decrease) when ambient temperature increases. Regarding this latter topic, different systems are currently used in gas turbine and combined cycle power plants in order to reduce gas turbine inlet air temperature, and, therefore, the impact of ambient conditions on performances. In this paper, a review of these systems is presented. Both systems based on water evaporative cooling and on refrigeration by means of absorption or mechanical/electrical chillers are described. Thermodynamic models of the systems are built within the framework of a commercial code for the simulation of energy conversion systems. A sensitivity analysis on the main parameters is presented. Finally, the models are applied to study the capabilities of the different systems by imposing the real temperature profiles of different sites for a whole year.

Andrea De Pascale; Francesco Melino; Mirko Morini

2014-01-01T23:59:59.000Z

43

Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assessment of the Surveillance Program of the High-Level Waste Storage Tanks at Hanford :.I LALI iE REJ 163 ROOM 1t 4 F77L. -77 .:earmn OfEeg Asitn Sertr fo niomn 4 z. r...

44

Swozzle based burner tube premixer including inlet air conditioner for low emissions combustion  

DOE Patents [OSTI]

A burner for use in a combustion system of a heavy-duty industrial gas turbine includes a fuel/air premixer having an air inlet, a fuel inlet, and an annular mixing passage. The fuel/air premixer mixes fuel and air into a uniform mixture for injection into a combustor reaction zone. The burner also includes an inlet flow conditioner disposed at the air inlet of the fuel/air premixer for controlling a radial and circumferential distribution of incoming air. The pattern of perforations in the inlet flow conditioner is designed such that a uniform air flow distribution is produced at the swirler inlet annulus in both the radial and circumference directions. The premixer includes a swozzle assembly having a series of preferably air foil shaped turning vanes that impart swirl to the airflow entering via the inlet flow conditioner. Each air foil contains internal fuel flow passages that introduce natural gas fuel into the air stream via fuel metering holes that pass through the walls of the air foil shaped turning vanes. By injecting fuel in this manner, an aerodynamically clean flow field is maintained throughout the premixer. By injecting fuel via two separate passages, the fuel/air mixture strength distribution can be controlled in the radial direction to obtain optimum radial concentration profiles for control of emissions, lean blow outs, and combustion driven dynamic pressure activity as machine and combustor load are varied.

Tuthill, Richard Sterling (Bolton, CT); Bechtel, II, William Theodore (Scotia, NY); Benoit, Jeffrey Arthur (Scotia, NY); Black, Stephen Hugh (Duanesburg, NY); Bland, Robert James (Clifton Park, NY); DeLeonardo, Guy Wayne (Scotia, NY); Meyer, Stefan Martin (Troy, NY); Taura, Joseph Charles (Clifton Park, NY); Battaglioli, John Luigi (Glenville, NY)

2002-01-01T23:59:59.000Z

45

Means for positively seating a piezoceramic element in a piezoelectric valve during inlet gas injection  

DOE Patents [OSTI]

A piezoelectric valve in a gas delivery system includes a piezoceramic element bonded to a valve seal and disposed over a valve seat, and retained in position by an O-ring and a retainer; an insulating ball normally biased by a preload spring against the piezoceramic element; an inlet gas port positioned such that upon admission of inlet gas into the valve, the piezoceramic element is positively seated. The inlet gas port is located only on the side of the piezoceramic element opposite the seal. 3 figs.

Wright, K.E.

1994-08-23T23:59:59.000Z

46

Means for positively seating a piezoceramic element in a piezoelectric valve during inlet gas injection  

DOE Patents [OSTI]

A piezoelectric valve in a gas delivery system includes a piezoceramic element bonded to a valve seal and disposed over a valve seat, and retained in position by an O-ring and a retainer; an insulating ball normally biased by a preload spring against the piezoceramic element; an inlet gas port positioned such that upon admission of inlet gas into the valve, the piezoceramic element is positively seated. The inlet gas port is located only on the side of the piezoceramic element opposite the seal.

Wright, Kenneth E. (Yardley, PA)

1994-01-01T23:59:59.000Z

47

Ocean acoustic effects of explosions on land: Evaluation of Cook Inlet beluga whale habitability  

Science Journals Connector (OSTI)

The Eagle River Flats is an impact region for artillery at Fort Richardson Alaska. Adjacent to the Flats is the Knik Arm of Cook Inlet which is the habitat for a distinct population of beluga whales (Delphinapterus leucas). In order to assess the effects of 155 mm artillery explosions on the habitat of these whales a series of 6.8 kg C4 plastique charges were detonated on land 500 meters from the waters edge. In addition to land seismic and acoustic arrays hydrophones were deployed in the Knik Arm at high and low tide. This paper discusses the ocean acoustic measurements. The received signal 30 meters from the shore in water depths of 8 meters was more intense at high tide with broadband peak levels of approximately 180 dB re 1 microPa. The dominant frequency was about 20 Hz and most of the received acoustic energy was below 500 Hz. The geology and oceanography of the area were used to model the acoustic time series. Modeled and measured time series are compared to validate the geophysical model and provide estimates of peak pressure and energy flux density over the near shore habitat. [Work supported by U.S. Army Corps of Engineers CRREL.

Sara K. Tremblay; Thomas S. Anderson; Erin C. Pettit; Peter M. Scheifele; Gopu R. Potty; James H. Miller

2007-01-01T23:59:59.000Z

48

File:EIA-AK-CookInlet-Liquids.pdf | Open Energy Information  

Open Energy Info (EERE)

AK-CookInlet-Liquids.pdf AK-CookInlet-Liquids.pdf Jump to: navigation, search File File history File usage Alaska's Cook Inlet By 2001 Liquids Reserve Class Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(5,100 × 6,600 pixels, file size: 10.19 MB, MIME type: application/pdf) Description Alaska's Cook Inlet By 2001 Liquids Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States Alaska File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment

49

Anaesthetic machine pipeline inlet pressure gauges do not always measure pipeline pressure  

Science Journals Connector (OSTI)

Some anaesthetic gas machines have pipeline inlet pressure gauges which indicate the higher of either pipeline pressure, or machine circuit pressure (the ... specific circumstances lead to a delayed appreciation ...

Douglas B. Craig; John Longmuir

1980-09-01T23:59:59.000Z

50

Nuclear reactor fuel assembly duct-tube-to-inlet-nozzle attachment system  

DOE Patents [OSTI]

A reusable system for removably attaching the lower end 21 of a nuclear reactor fuel assembly duct tube to an upper end 11 of a nuclear reactor fuel assembly inlet nozzle. The duct tube's lower end 21 has sides terminating in locking tabs 22 which end in inwardly-extending flanges 23. The flanges 23 engage recesses 13 in the top section 12 of the inlet nozzle's upper end 11. A retaining collar 30 slides over the inlet nozzle's upper end 11 to restrain the flanges 23 in the recesses 13. A locking nut 40 has an inside threaded portion 41 which engages an outside threaded portion 15 of the inlet nozzle's upper end 11 to secure the retaining collar 30 against protrusions 24 on the duct tube's sides.

Christiansen, David W. (Kennewick, WA); Smith, Bob G. (Kennewick, WA)

1982-01-01T23:59:59.000Z

51

A new modeling approach of pressure waves at the inlet of internal combustion engines  

Science Journals Connector (OSTI)

This paper presents a new model used to describe the propagation of pressure waves at the inlet systems of internal combustion engine. In the first part, an analogy ... a pipe and a mechanical ideal mass damper spring

David Chalet; Alexandre Mah; Jean-Franois Htet

2011-06-01T23:59:59.000Z

52

Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Genetic Genetic Variability of Cell Wall Degradability for the Selection of Alfalfa with Improved Saccharification Efficiency Marc-Olivier Duceppe & Annick Bertrand & Sivakumar Pattathil & Jeffrey Miller & Yves Castonguay & Michael G. Hahn & Réal Michaud & Marie-Pier Dubé # Her Majesty the Queen in Right of Canada 2012 Abstract Alfalfa (Medicago sativa L.) has a high potential for sustainable bioethanol production, particularly because of its low reliance on N fertilizer. We assessed near-infrared reflec- tance spectroscopy (NIRS) as a high-throughput technique to measure cell wall (CW) degradability in a large number of lignified alfalfa stem samples. We also used a powerful immu- nological approach, glycome profiling, and chemical analyses to increase our knowledge of the composition of CW poly- saccharides of alfalfa stems with various levels

53

Biases in Ion Transmission Through an Electrospray Ionization-Mass Spectrometry Capillary Inlet  

SciTech Connect (OSTI)

The standard heated capillary inlet of an electrospray ionization mass spectrometry (ESI-MS) interface was compared with shorter versions of the inlet to determine the effects on transmission and ionization efficiencies for low-flow electrosprays. The primary finding of the study was a large bias towards higher mobility species in the electrospray current losses to the inside walls of the inlet. The transmission efficiency increased with decreasing capillary length due to reduced losses along the capillary. A decrease in transmission efficiency was also confirmed for electrosprays of higher conductivity solvents. A direct correlation between mass spectrometry sensitivity and the transmitted electrospray current was not observed as some analytes showed little to no increase in sensitivity while others showed as high as a 15 fold increase. The variation was shown to at least be partially dependent on the analytes mobilities. Higher mobility analytes demonstrated a larger increase in sensitivity when shorter inlets were used. The results indicate that considerable biases against higher mobility species can be produced by the use of long capillary inlets in the ESI-MS interface and strategies are provided to minimize the bias against higher mobility species for efficient ion transmission through the heated capillary interface.

Page, Jason S.; Marginean, Ioan; Baker, Erin Shammel; Kelly, Ryan T.; Tang, Keqi; Smith, Richard D.

2009-12-01T23:59:59.000Z

54

U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), September 2003  

Broader source: Energy.gov [DOE]

Chart of Database of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC)

55

File:EIA-AK-CookInlet-Gas.pdf | Open Energy Information  

Open Energy Info (EERE)

File File Edit with form History Facebook icon Twitter icon » File:EIA-AK-CookInlet-Gas.pdf Jump to: navigation, search File File history File usage Alaska's Cook Inlet By 2001 Gas Reserve Class Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(5,100 × 6,600 pixels, file size: 10.19 MB, MIME type: application/pdf) Description Alaska's Cook Inlet By 2001 Gas Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States Alaska File history Click on a date/time to view the file as it appeared at that time.

56

File:EIA-AK-CookInlet-BOE.pdf | Open Energy Information  

Open Energy Info (EERE)

CookInlet-BOE.pdf CookInlet-BOE.pdf Jump to: navigation, search File File history File usage Alaska's Cook Inlet By 2001 BOE Reserve Class Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(5,100 × 6,600 pixels, file size: 10.19 MB, MIME type: application/pdf) Description Alaska's Cook Inlet By 2001 BOE Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States Alaska File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:55, 20 December 2010 Thumbnail for version as of 16:55, 20 December 2010 5,100 × 6,600 (10.19 MB) MapBot (Talk | contribs) Automated bot upload

57

AO02 -Aerosol Inlet Design Candidate 44263 Supervisor: Dr. Daniel Peters Word Count:3812  

E-Print Network [OSTI]

are suggested. A field test investigating the size distribution of tyre smoke aerosols from airplane landings is conducted using the suggested designs. No significant tyre smoke is observed despite the designs being of the aerosol must be drawn through an inlet and transported to the collection or mea- surement device

Oxford, University of

58

Degree of mixing downstream of rectangular bends and design of an inlet for ambient aerosol  

E-Print Network [OSTI]

version of the AWI-780 L/min unit featured an internal cone, which was removed because the penetration of the AWI-780 without the bottom chamber was higher than that of the Battelle inlet ? 81% with the cone while 86% without the cone for around 9.5 µm...

Seo, Youngjin

2006-04-12T23:59:59.000Z

59

Study of Gas Solid Flow Characteristics in Cyclone Inlet Ducts of A300Mwe CFB Boiler  

Science Journals Connector (OSTI)

Gas solid flow characteristics in cyclones inlet duct of a 300MW CFB boiler were studied in a cold circulating fluidized bed (CFB) experimental setup according to a 410t/h CFB boiler with a scale of 10?1....Figs...

J. Y. Tang; X. F. Lu; J. Lai; H. Z. Liu

2010-01-01T23:59:59.000Z

60

A Computational Study of Icing Effects on the Performance of an S-Duct Inlet  

E-Print Network [OSTI]

/sec. x, X Geometrical axial direction m x? Spatial derivative in X-direction m y, Y Geometric radial direction m ix Nomenclature (cont.) Symbol Definition Unit yp Distance from point... ............................................................................ 27 Figure 3. 4. 1: Total pressure distortion patterns ........................................................ 31 Figure 3. 4. 2: Compressor map with inlet total pressure distortion ........................... 31 Figure 3. 4. 3: Critical...

Jin, Wonjin

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Polystyrene PS648 inlet optical birefringence pattern, piston speed 1.4mm/s  

E-Print Network [OSTI]

The optical birefringence pattern obtained from polystyrene PS648 flowing through a narrow slit. Experiment conducted on the Cambridge Multi Pass Rheometer (MPR4) at a piston speed of 1.4 mm/s at 170C. Video shows the inlet flow (from bottom to top)....

Hassell, David

2008-08-27T23:59:59.000Z

62

Polystyrene PS648 inlet optical birefringence pattern, piston speed 1.0mm/s  

E-Print Network [OSTI]

The optical birefringence pattern obtained from polystyrene PS648 flowing through a narrow slit. Experiment conducted on the Cambridge Multi Pass Rheometer (MPR4) at a piston speed of 1.0 mm/s at 170C. Video shows the inlet flow (from bottom to top)....

Hassell, David

2008-08-27T23:59:59.000Z

63

Polystyrene PS648 inlet optical birefringence pattern, piston speed 0.16mm/s  

E-Print Network [OSTI]

The optical birefringence pattern obtained from polystyrene PS648 flowing through a narrow slit. Experiment conducted on the Cambridge Multi Pass Rheometer (MPR4) at a piston speed of 0.16 mm/s at 170C. Video shows the inlet flow (from bottom to top)....

Hassell, David

2008-08-27T23:59:59.000Z

64

Lateral circulation generates flood-tide stratification and estuarine exchange flow in a curved tidal inlet  

Science Journals Connector (OSTI)

Cross-channel transect measurements of micro-structure and velocity in a well-mixed and curved tidal inlet in the German Wadden Sea show the occurrence of significant late-flood stratification. This stratification is found to be due to lateral ...

Johannes Becherer; Mark T. Stacey; Lars Umlauf; Hans Burchard

65

Database (Report) of U.S. CHP Installations Incorporating Thermal Energy Storage (TES) and/or Turbine Inlet Cooling (TIC), 2004  

Broader source: Energy.gov [DOE]

Development of a database, in Excel format, listing CHP installations incorporating thermal energy storage or turbine inlet cooling.

66

Zarillo, G. A., and Brehin, F. G. A. 2007. Hydrodynamic and Morphologic Modeling at Sebastian Inlet, FL. Proceedings Coastal Sediments '07 Conference, ASCE Press, Reston,  

E-Print Network [OSTI]

Inlet, FL. Proceedings Coastal Sediments '07 Conference, ASCE Press, Reston, VA, 1297-1310. HYDRODYNAMIC Modeling System (CMS) to investigate the morphological response to time varying forcing, sediment texture evolution of tidal inlet shoals is an important management tool, since they control sediment budgets. Inlet

US Army Corps of Engineers

67

CFD Modeling of a CFB Riser Using Improved Inlet Boundary Conditions  

Science Journals Connector (OSTI)

A computational fluid dynamics (CFD) model based on Eulerian?Eulerian approach coupled with granular kinetics theory was adopted to investigate the hydrodynamics and flow structures in a circulating fluidized bed (CFB) riser column. A new approach to specify the inlet boundary conditions was proposed in this study to simulate gas?solids flow in CFB risers more accurately. Simulation results were compared with the experimental data and good agreement between the numerical results and experimental data was observed under different operating conditions which indicates the effectiveness and accuracy of the CFD model with the proposed inlet boundary conditions. The results also illustrate a clear core annulus structure in the CFB riser under all operating conditions both experimentally and numerically.

B. T. Peng; C. Zhang; J. X. Zhu; X. B. Qi

2010-01-01T23:59:59.000Z

68

Three-dimensional shock-shock interactions on the scramjet inlet  

SciTech Connect (OSTI)

The effects of shock impingement on the inlet of a scramjet engine are investigated numerically. The impinging shock is caused by the vehicle forebody. The interaction of this forebody shock with the inlet leading edge shock results in a very complex fully three-dimensional flowfield containing local regions of high pressure and intense heating. In the present investigation, this complex flowfield is calculated by solving the thin-layer Navier-Stokes equations using a finite-volume flux splitting technique due to van Leer. For zero or small sweep angles a Type IV interaction occurs while for moderate sweep of about 25 deg, a Type V interaction occurs. Both Type IV and Type V interactions are investigated. 25 refs.

Singh, D.J.; Tiwari, S.N.; Kumar, A.

1990-01-01T23:59:59.000Z

69

Elimination of ``memory`` from sample handling and inlet system of a mass spectrometer  

DOE Patents [OSTI]

This paper describes a method for preparing the sample handling and inlet system of a mass spectrometer for analysis of a subsequent sample following analysis of a previous sample comprising the flushing of the system interior with supercritical CO{sub 2} and venting the interior. The method eliminates the effect of system ``memory`` on the subsequent analysis, especially following persistent samples such as xenon and krypton.

Chastgner, P.

1991-05-08T23:59:59.000Z

70

Effect of Gas/Steam Turbine Inlet Temperatures on Combined Cycle Having Air Transpiration Cooled Gas Turbine  

Science Journals Connector (OSTI)

Worldwide efforts are being made for further improving the gas/steam combined cycle performance by having better ... . The scope of improvement is possible through turbines having higher turbine inlet temperature...

S. Kumar; O. Singh

2012-10-01T23:59:59.000Z

71

A comparative analysis of the pelvic inlet and body weight of beef females and the relationship to dystocia  

E-Print Network [OSTI]

with characterization of the pelvic inlet for breeds and individuals within breeds can logical selection criteria be established. The horizontal (Hz) and vertical (Vr) measurements of the pelvic inlet, along with body weight (Wt), were re- corded for 65 weanling.... Angus (A), Brahman (B), Charolais (L), Hereford (H), and Santa Gertrudis (G) breeds and crosses were included in the mixed longitudinal data for Hz, Vr and Wt. Calving ease was scored at parturition. Due to the lack of association between breed...

Bennett, Frances Annette

2012-06-07T23:59:59.000Z

72

Engineering geology of a mudslide at Bracebridge Inlet, Bathurst Island, Northwest Territories, Canada  

E-Print Network [OSTI]

-siltstone, ~~:: (undivided) ~. . . , sandstone, dolomite Figure 3. Geologic map of study area. Star denotes location of mudslide. outcrop of the south flank of the Bracebridge Inlet anticline. Based on Memoir 378 by Kerr (1974) this unit is composed largely of limy... Norway. Soil movement, and pore water pressures were recorded. His findings ind~cate that solifluction is not due solely to increases in water content over an impermeable layer. A considerable part of the loss in strength at thaw is due to a reduction...

Mayer, Terry Ann

2012-06-07T23:59:59.000Z

73

CFD modeling of a gas turbine combustor from compressor exit to turbine inlet  

SciTech Connect (OSTI)

Gas turbine combustor CFD modeling has become an important combustor design tool in the past few years, but CFD models are generally limited to the flow field inside the combustor liner at the diffuser/combustor annulus region. Although strongly coupled in reality, the two regions have rarely been coupled in CFD modeling. A CFD calculation for a full model combustor from compressor diffuser exit to turbine inlet is described. The coupled model accomplishes the following two main objectives: (1) implicit description of flow splits and flow conditions for openings into the combustor liner, and (2) prediction of liner wall temperatures. Conjugate heat transfer with nonluminous gas radiation (appropriate for lean, low emission combustors) is utilized to predict wall temperatures compared to the conventional approach of predicting only near wall gas temperatures. Remaining difficult issues such as generating the grid, modeling swirler vane passages, and modeling effusion cooling are also discussed.

Crocker, D.S.; Nickolaus, D.; Smith, C.E. [CFD Research Corp., Huntsville, AL (United States)

1999-01-01T23:59:59.000Z

74

Surface cooling of scramjet engine inlets using heat pipe, transpiration, and film cooling  

SciTech Connect (OSTI)

This article reports the results of applying a finite-difference-based computational technique to the problem of predicting the transient thermal behavior of a scramjet engine inlet exposed to a typical hypersonic flight aerodynamic surface heating environment, including type IV shock interference heating. The leading-edge cooling model utilized incorporates liquid metal heat pipe cooling with surface transpiration and film cooling. Results include transient structural temperature distributions, aerodynamic heat inputs, and surface coolant distributions. It seems that these cooling techniques may be used to hold maximum skin temperatures to near acceptable values during the severe aerodynamic and type IV shock interference heating effects expected on the leading edge of a hypersonic aerospace vehicle scramjet engine. 15 refs.

Modlin, J.M.; Colwell, G.T. (U.S. Army, Strategic Defense Command, Huntsville, AL (United States) Georgia Institute of Technology, Atlanta (United States))

1992-09-01T23:59:59.000Z

75

The effect of precooling inlet air on CHP efficiency in natural gas pressure reduction stations  

Science Journals Connector (OSTI)

Almost all pressure reduction stations in Iran use expansion valves to reduce the natural gas pressure, which leads to wasting large amount of exergy. In this paper, a system is proposed which includes the modification of a conventional pressure reduction station with the addition of a turbo expander and a gas turbine for power recovery and generation. The next step is investigating the effect of heat exchanger on proposed combined heat and power system. The objective of the simulation is first to investigate the effects of modifying components performance equations on system efficiency and performance at a set operating condition. Secondly, to conduct feasibility study of using a heat exchanger at gas pressure reduction station to boost station efficiency in terms of energy saving and economic value. The result demonstrates that by precooling inlet air of gas turbine, station efficiency increases specially when the turbine works at full load.

Mahyar Kargaran; Mahmoood Farzaneh-Grod; Mohammad Saberi

2013-01-01T23:59:59.000Z

76

Measurement of Total Water with a Tunable Diode Laser Hygrometer: Inlet Analysis, Calibration Procedure, and Ice Water Content Determination  

Science Journals Connector (OSTI)

The University of Colorado closed-path tunable diode laser hygrometer (CLH), a new instrument for the in situ measurement of enhanced total water (eTW, the sum of water vapor and condensed water enhanced by a subisokinetic inlet), has recently ...

Sean M. Davis; A. Gannet Hallar; Linnea M. Avallone; William Engblom

2007-03-01T23:59:59.000Z

77

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 2890 of 28,560 results. 81 - 2890 of 28,560 results. Download EA-1433: Final Environmental Assessment Cooperative Gypsy Moth Project for Illinois 2002 http://energy.gov/nepa/downloads/ea-1433-final-environmental-assessment Download URTAC Meeting- March 4, 2008 Meeting minutes and Federal Register notice for the March 4, 2008 URTAC meeting http://energy.gov/fe/downloads/urtac-meeting-march-4-2008 Article U-042: Mac RealPlayer Multiple Vulnerabilities Multiple vulnerabilities have been reported in Mac RealPlayer, which can be exploited by malicious people to compromise a user's system. http://energy.gov/cio/articles/u-042-mac-realplayer-multiple-vulnerabilities Download EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA http://energy.gov/nepa/downloads/ea-1949-ferc-draft-environmental-assessment

78

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 700 of 29,416 results. 91 - 700 of 29,416 results. Download EA-1916: Final Environmental Assessment Ocean Renewable Power Company Maine, LLC Cobscook Bay Tidal Energy Pilot Project, Cobscook Bay in Washington County, Maine http://energy.gov/nepa/downloads/ea-1916-final-environmental-assessment Download EIS-0220: Supplemental Record of Decision (November 1997) Savannah River Operations Office Interim Managemnet of Nuclear Materials at the Savannah River Site http://energy.gov/nepa/downloads/eis-0220-supplemental-record-decision-november-1997 Download EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA http://energy.gov/nepa/downloads/ea-1949-ferc-draft-environmental-assessment Download EIS-0238-SA-01: Supplement Analysis Continued Operations of Los Alamos National Laboratory

79

Environmental continuous air monitor inlet with combined preseparator and virtual impactor  

DOE Patents [OSTI]

An inlet for an environmental air monitor is described wherein a pre-separator interfaces with ambient environment air and removes debris and insects commonly associated with high wind outdoors and a deflector plate in communication with incoming air from the pre-separator stage, that directs the air radially and downward uniformly into a plurality of accelerator jets located in a manifold of a virtual impactor, the manifold being cylindrical and having a top, a base, and a wall, with the plurality of accelerator jets being located in the top of the manifold and receiving the directed air and accelerating directed air, thereby creating jets of air penetrating into the manifold, where a major flow is deflected to the walls of the manifold and extracted through ports in the walls. A plurality of receiver nozzles are located in the base of the manifold coaxial with the accelerator jets, and a plurality of matching flow restrictor elements are located in the plurality of receiver nozzles for balancing and equalizing the total minor flow among all the plurality of receiver nozzles, through which a lower, fractional flow extracts large particle constituents of the air for collection on a sample filter after passing through the plurality of receiver nozzles and the plurality of matching flow restrictor elements.

Rodgers, John C. (Santa Fe, NM)

2007-06-19T23:59:59.000Z

80

The effect of particle inlet conditions on FCC riser hydrodynamics and product yields.  

SciTech Connect (OSTI)

Essential to today's modern refineries and the gasoline production process are fluidized catalytic cracking units. By using a computational fluid dynamics (CFD) code developed at Argonne National Laboratory to simulate the riser, parametric and sensitivity studies were performed to determine the effect of catalyst inlet conditions on the riser hydrodynamics and on the product yields. Simulations were created on the basis of a general riser configuration and operating conditions. The results of this work are indications of riser operating conditions that will maximize specific product yields. The CFD code is a three-dimensional, multiphase, turbulent, reacting flow code with phenomenological models for particle-solid interactions, droplet evaporation, and chemical kinetics. The code has been validated against pressure, particle loading, and product yield measurements. After validation of the code, parametric studies were performed on various parameters such as the injection velocity of the catalyst, the angle of injection, and the particle size distribution. The results indicate that good mixing of the catalyst particles with the oil droplets produces a high degree of cracking in the riser.

Chang, S. L.; Golchert, B.; Lottes, S. A.; Zhou, C. Q.; Huntsinger, A.; Petrick, M.

1999-10-11T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 21270 of 29,416 results. 61 - 21270 of 29,416 results. Page Reactor Materials The reactor materials crosscut effort will enable the development of innovative and revolutionary materials and provide broad-based, modern materials science that will benefit all four DOE-NE... http://energy.gov/ne/nuclear-energy-enabling-technologies/reactor-materials Page EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission

82

Investigation of the nonlinear response of turbulent premixed flames to imposed inlet velocity oscillations  

SciTech Connect (OSTI)

Acoustically forced lean premixed turbulent bluff-body stabilized flames are investigated using turbulent combustion CFD. The calculations simulate aspects of the experimental investigation by Balachandran et al. [R. Balachandran, B. Ayoola, C. Kaminski, A. Dowling, E. Mastorakos, Combust. Flame 143 (2005) 37-55] and focus on the amplitude dependence of the flame response. For the frequencies of interest in this investigation an unsteady Reynolds-averaged Navier-Stokes (URANS) approach is appropriate. The combustion is represented using a modified laminar flamelet approach with an algebraic representation of the flame surface density. The predictions are compared with flame surface density (FSD) and OH* chemiluminescence measurements. In the experiments the response of the flame has been quantified by means of a number of single-frequency, amplitude-dependent transfer functions. The predicted flame shape and position are in good agreement with the experiment. The dynamic response of the flame to inlet velocity forcing is also well captured by the calculations. At moderate frequencies nonlinear behavior of the transfer functions is observed as the forcing amplitude is increased. In the experiments this nonlinearity was attributed in part to the rollup of the reacting shear layer into vortices and in part to the collision of the inner and outer flame sheets. This transition to nonlinearity is also observed in the transfer functions obtained from the predictions. Furthermore, the vortex shedding and flame-sheet collapse may be seen in snapshots of the predicted flow field taken throughout the forcing cycle. The URANS methodology successfully predicts the behavior of the forced premixed turbulent flames and captures the effects of saturation in the transfer function of the response of the heat release to velocity fluctuations. (author)

Armitage, C.A.; Mastorakos, E.; Cant, R.S. [Department of Engineering, Trumpington Street, University of Cambridge, Cambridge, CB2 1PZ (United Kingdom); Balachandran, R. [Department of Mechanical Engineering, University College London, Torrington Place, London, WC1E 7JE (United Kingdom)

2006-08-15T23:59:59.000Z

83

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 1950 of 26,777 results. 41 - 1950 of 26,777 results. Download Hanford Site C Tank Farm Meeting Summary- March 2010 Meeting Summary for Development of the Hanford Site C Tank Farm Performance Assessment http://energy.gov/em/downloads/hanford-site-c-tank-farm-meeting-summary-march-2010 Download Smart Grid Regional and Energy Storage Demonstration Projects: Awards List of Smart Grid Regional and Energy Storage Demonstration Projects awards under the American Recovery and Reinvestment Act organized by state, including, city, recipients, description, location,... http://energy.gov/oe/downloads/smart-grid-regional-and-energy-storage-demonstration-projects-awards Download EA-1949: FERC Notice of Availability of an Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA

84

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 3290 of 28,905 results. 81 - 3290 of 28,905 results. Download Southeastern Power Administration 2007 Annual Report This report reflects our agency's programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2006, and ending September 31, 2007. http://energy.gov/sepa/downloads/southeastern-power-administration-2007-annual-report Download EA-1523: Finding of No Significant Impact Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Calcasieu Parish, Louisiana http://energy.gov/nepa/downloads/ea-1523-finding-no-significant-impact Download EA-1949: FERC Final Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA http://energy.gov/nepa/downloads/ea-1949-ferc-final-environmental-assessment

85

Latest Documents and Notices | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 16, 2013 August 16, 2013 EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND August 15, 2013 EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington August 15, 2013 EA-1934: Finding of No Significant Impact Expansion of Active Borrow Areas, Hanford Site, Richland, Washington August 15, 2013 EA-1934: Final Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet Admiralty Inlet Pilot Tidal Project, Puget Sound, WA August 9, 2013 EA-1949: FERC Final Environmental Assessment

86

A Parametric Study of a Large Break in Reactor Inlet Header of CANDU6 Reactors Using RELAP5 Code  

SciTech Connect (OSTI)

A large break loss of coolant accident in a CANDU can lead to degraded fuel cooling in a large number of fuel channels due to the apparition of a prolonged flow stagnation period in the downstream core pass. The paper presents a parametric study of a reactor inlet header break. The parametric survey includes: the size of the break, the choked flow model employed, the emergency core cooling (ECC) performance and the core nodalization. The study is performed with RELAP5/SCDAP mod 3.4 and the results are compared with the safety analysis results. (authors)

Prisecaru, Ilie; Dupleac, Daniel; Ghitescu, Petre [Power Plant Engineering Faculty, Politehnica Univ., 313 Splaiul Independentei, Bucharest (Romania); Biro, Lucian [National Commission for Nuclear Activities Control, 14 Libertatii Blvd., Bucharest (Romania)

2006-07-01T23:59:59.000Z

87

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 15, 2013 January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA December 27, 2012 EM's Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection RICHLAND, Wash. - The Office of River Protection (ORP) has completed retrieval of radioactive and chemical waste from the tenth underground waste storage tank at the Hanford site. December 17, 2012 CX-009746: Categorical Exclusion Determination Upstream Ultrasonic Processing for Small Producers: Preventative Maintenance for Paraffin Management

88

Establishment of a research facility for investigating the effects of unsteady inlet flow, pressure gradient and curvature on boundary layer development, wake development and heat transfer  

E-Print Network [OSTI]

2. LITERATURE REVIEW 3. OBJECTIVES TABLE OF CONTENTS Page nl tv v111 xt 4. THE EXPERIMENTAL TEST FACILITY 4. 1. Overall Layout of the Test Facility 4, 2. The Fan and Inlet Duct Assembly 4. 3. The Diffuser, Settling Chamber and Nozzle... Assembly . 4. 4. The Wake Generator to Simulate Unsteady Inlet Flow . 4, 5. The Test Section to Simulate Blade Curvature 4, 6, The Convex Wall and Traversing System 4. 7, Adjustment of the Turbulence Level 4. 8. Capabilities of the Test Facility, 5...

Pardivala, Darayus Noshir

2012-06-07T23:59:59.000Z

89

Effects of fuel octane number and inlet air temperature on knock characteristics of a single cylinder engine  

SciTech Connect (OSTI)

A dual sample rate technique has been developed and applied to measuring in-cylinder pressure and its oscillations due to autoignition. The harmonics of in-cylinder oscillations were found in good agreement with those obtained from the solutions of wave equation in a cylindrical container. The time of knock relative to spark timing was almost independent of the knock intensity, fuel octane number, and inlet air temperature. The knock intensity was almost constant up to the spark advance when about 100% of the cycles were knocking, further spark advance resulted in higher knock intensity. The mass fraction of unburned fuel at the time of knock was about 10% and was independent of the frequency of the cycles knocking. These observations indicated that the phenomenon of knock is a single-site autoignition for intermittent knock and multi-site autoignition for severe knocking.

Haghgooie, M.

1990-01-01T23:59:59.000Z

90

Miocene fluvial-tidal sedimentation in a residual forearc basin of the Northeastern Pacific Rim: Cook Inlet, Alaska case study  

SciTech Connect (OSTI)

Cook Inlet in southern Alaska represents a Cenozoic residual forearc basin in a convergent continental margin, where the Pacific Plate is being subducted beneath the North American Plate. This basin accumulated the >6,700-m-thick, mainly nonmarine, Eocene-Pliocene Kenai Group. These rocks contain biogenic coal-bed methane estimated to be as high as 245 TCF. Lignites to subbituminous coals with subsurface R{sub o} ranging from 0.38 to 0.73 percent and the stage of clay-mineral diagenesis and expandibility indicate a thermally {open_quotes}cool{close_quotes} basin. Miocene Tyonek and Beluga Formations compose 65 percent (>4,300 m thick) of the Kenai Group. The Tyonek includes conglomeratic sandstones, siltstones, mudstones, coals, and carbonaceous shales, interpreted as braided- stream deposits. These fluvial deposits are interbecided with burrowed, lenticular, and flaser-bedded sandstones, siltstones, and mudstones, interpreted as tidal deposits. Tyonek framework conglomerates formed in wet alluvial fans incised on paleovalleys of the Chugach terrane. Coal-forming mires are well developed on abandoned braided-stream deposits. Tyonek drainages formed in high-gradient alluvial plains inundated by tides similar to environments in the modern upper Cook Inlet. The upper Miocene Beluga consists of sandstones, siltstones, mudstones, carbonaceous shales, and coals deposited in meandering (low sinuosity) and anastomosed fluvial systems. These fluvial deposits alternated vertically with deposits of coal-forming mires. The Beluga drainages formed in low-gradient alluvial plains. The high-gradient Tyonek alluvial plain was probably controlled by provenance uplift and eustatic change, whereas the low-gradient Beluga alluvial plain was influenced by subdued provenance uplift and rapid basin subsidence. Rapid sedimentation on both these low- and high-gradient alluvial plains, which kept up with subsidence, produced a thermally {open_quotes}cool{close_quotes} basin.

Stricker, G.D.; Flores, R.M. [Geological Survey, Denver, CO (United States)

1996-12-31T23:59:59.000Z

91

Miocene fluvial-tidal sedimentation in a residual forearc basin of the Northeastern Pacific Rim: Cook Inlet, Alaska case study  

SciTech Connect (OSTI)

Cook Inlet in southern Alaska represents a Cenozoic residual forearc basin in a convergent continental margin, where the Pacific Plate is being subducted beneath the North American Plate. This basin accumulated the >6,700-m-thick, mainly nonmarine, Eocene-Pliocene Kenai Group. These rocks contain biogenic coal-bed methane estimated to be as high as 245 TCF. Lignites to subbituminous coals with subsurface R[sub o] ranging from 0.38 to 0.73 percent and the stage of clay-mineral diagenesis and expandibility indicate a thermally [open quotes]cool[close quotes] basin. Miocene Tyonek and Beluga Formations compose 65 percent (>4,300 m thick) of the Kenai Group. The Tyonek includes conglomeratic sandstones, siltstones, mudstones, coals, and carbonaceous shales, interpreted as braided- stream deposits. These fluvial deposits are interbecided with burrowed, lenticular, and flaser-bedded sandstones, siltstones, and mudstones, interpreted as tidal deposits. Tyonek framework conglomerates formed in wet alluvial fans incised on paleovalleys of the Chugach terrane. Coal-forming mires are well developed on abandoned braided-stream deposits. Tyonek drainages formed in high-gradient alluvial plains inundated by tides similar to environments in the modern upper Cook Inlet. The upper Miocene Beluga consists of sandstones, siltstones, mudstones, carbonaceous shales, and coals deposited in meandering (low sinuosity) and anastomosed fluvial systems. These fluvial deposits alternated vertically with deposits of coal-forming mires. The Beluga drainages formed in low-gradient alluvial plains. The high-gradient Tyonek alluvial plain was probably controlled by provenance uplift and eustatic change, whereas the low-gradient Beluga alluvial plain was influenced by subdued provenance uplift and rapid basin subsidence. Rapid sedimentation on both these low- and high-gradient alluvial plains, which kept up with subsidence, produced a thermally [open quotes]cool[close quotes] basin.

Stricker, G.D.; Flores, R.M. (Geological Survey, Denver, CO (United States))

1996-01-01T23:59:59.000Z

92

A study of the effects of inlet preswirl on the dynamic coefficients of a straight-bore honeycomb gas damper seal  

E-Print Network [OSTI]

A STUDY OF THE EFFECTS OF INLET PRESWIRL ON THE DYNAMIC COEFFICIENTS OF A STRAIGHT-BORE HONEYCOMB GAS DAMPER SEAL A Thesis by TONY BRANDON SPROWL Submitted to the Office of Graduate Studies of Texas A&M University...-BORE HONEYCOMB GAS DAMPER SEAL A Thesis by TONY BRANDON SPROWL Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved as to style and content by...

Sprowl, Tony Brandon

2005-02-17T23:59:59.000Z

93

Assessment Report  

Energy Savers [EERE]

Assessment Report Assessment of Audit Coverage of Cost Allowability for Lawrence Livermore National Laboratory under Department of Energy Contract No. DE-AC52-07NA27344 during...

94

E-Print Network 3.0 - admiralty bay king Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ryde Drummoyne Parramatta Epping Carlingford Macquarie Homebush Bay Strathfield Sydney Kings Cross... Frenchs Forest Brookvale The Spit Manly Chatswood Lane Cove Watsons...

95

Thermal-fluid and electrochemical modeling and performance study of a planar solid oxide electrolysis cell : analysis on SOEC resistances, size, and inlet flow conditions.  

SciTech Connect (OSTI)

Argonne National Laboratory and Idaho National Laboratory researchers are analyzing the electrochemical and thermal-fluid behavior of solid oxide electrolysis cells (SOECs) for high temperature steam electrolysis using computational fluid dynamics (CFD) techniques. The major challenges facing commercialization of steam electrolysis technology are related to efficiency, cost, and durability of the SOECs. The goal of this effort is to guide the design and optimization of performance for high temperature electrolysis (HTE) systems. An SOEC module developed by FLUENT Inc. as part of their general CFD code was used for the SOEC analysis by INL. ANL has developed an independent SOEC model that combines the governing electrochemical mechanisms based on first principals to the heat transfer and fluid dynamics in the operation of SOECs. The ANL model was embedded into the commercial STAR-CD CFD software, and is being used for the analysis of SOECs by ANL. The FY06 analysis performed by ANL and reported here covered the influence of electrochemical properties, SOEC component resistances and their contributing factors, SOEC size and inlet flow conditions, and SOEC flow configurations on the efficiency and expected durability of these systems. Some of the important findings from the ANL analysis are: (1) Increasing the inlet mass flux while going to larger cells can be a compromise to overcome increasing thermal and current density gradients while increasing the cell size. This approach could be beneficial for the economics of the SOECs; (2) The presence of excess hydrogen at the SOEC inlet to avoid Ni degradation can result in a sizeable decrease in the process efficiency; (3) A parallel-flow geometry for SOEC operation (if such a thing be achieved without sealing problems) yields smaller temperature gradients and current density gradients across the cell, which is favorable for the durability of the cells; (4) Contact resistances can significantly influence the total cell resistance and cell temperatures over a large range of operating potentials. Thus it is important to identify and avoid SOEC stack conditions leading to such high resistances due to poor contacts.

Yildiz, B.; Smith, J.; Sofu, T.; Nuclear Engineering Division

2008-06-25T23:59:59.000Z

96

Consequence Assessment  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

97

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

98

ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

99

RADIOLOGICAL ASSESSMENT  

Office of Legacy Management (LM)

ASSESSMENT ASSESSMENT and STABILIZATION' SCENARIOS PARRERSBURG,'W. VA. SITE FEBRUARY 1980 M. CARSON J. COFFMAN N. MANDELTORT, ! Division of Nuclear Service Operations Chem-Nuclear\ Systems, Inc. 240 Stoneridge Dr., Suite 100 Columbia, South Carolina 29210 Prepared for AMAX Specialty Hetals Corporation One Greenwich Plaza Greenwich, Connecticut 06830 During July' 1978, Chem-Nuclear Systems, Inc. (CNSI) began an assessment program for AMAX Specialty Metals Corp."(AMAX) u to locate, quantify, and evaluate the'extent of environmental radioactive contamination at the AMAX Parkersburg., West Virginia former zirconium/hafnium processing facility. In addition, preliminary ive assessments were to be made to assist AMAX in evaluat ,ing alternat methods for site cleanup.

100

Risk Assessment  

Broader source: Energy.gov [DOE]

A set of issues that state and local governments should carefully consider, with the goal of helping them assess and anticipate solutions for some worst case or unfortunate case scenarios as they...

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Environmental Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ASSESSMENT (EA) ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT BLM Office: Carlsbad Field Office DOI-BLM-NM-P020-2010-0011-EA Serial #: NM-123703 Department of Energy (DOE), Carlsbad Field Office (CBFO) Waste Isolation Pilot Plant (WIPP) South Access Road (SAR) 1.0 Purpose and Need for Action 1.1 The DOE CBFO, is requesting a right-of-way (ROW) that consists of re-

102

Rapid Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assessment Assessment of Lignin Content and Structure in Switchgrass (Panicum virgatum L.) Grown Under Different Environmental Conditions David G. J. Mann & Nicole Labbé & Robert W. Sykes & Kristen Gracom & Lindsey Kline & Isabella M. Swamidoss & Jason N. Burris & Mark Davis & C. Neal Stewart Jr. Published online: 13 October 2009 # Springer Science + Business Media, LLC. 2009 Abstract Switchgrass (Panicum virgatum L.) is a candi- date feedstock in bioenergy, and plant breeding and molecular genetic strategies are being used to improve germplasm. In order to assess these subsequent modifica- tions, baseline biomass compositional data are needed in a relevant variety of environments. In this study, switch- grass cv. Alamo was grown in the field, greenhouse, and growth chamber and harvested into individual leaf and stem tissue components. These components

103

Sleep Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sleep Assessment Sleep Assessment 1 | Thank you for taking the time to complete this extensive form. Sleep disturbances and/or fatigue are most often the result of many factors. In order to best treat your condition we need to understand your symptoms and history. Please bring your completed assessment form to your appointment. To schedule an appointment please call 505 844-HBES (4237). Name: Employee ID#: Date: Male Female Age: Health Plan : United BCBSNM Other: Referred by: Sleep and Health History In general, would you describe your sleep as: Refreshing Not Refreshing How would you rate your sleep? Very Good Good Adequate Poor Very Poor How would you describe your sleep problem? Sleep Problem (indicate all that apply) Duration of problem

104

Environmental Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

105

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 ENVIRONMENTAL ASSESSMENT FOR PROPOSED ENERGY CONSERVATION STANDARDS FOR RESIDENTIAL CLOTHES WASHERS December 2000 U.S. Department of Energy Assistant Secretary, Energy Efficiency & Renewable Energy Office of Building Research and Standards Washington, DC 20585 ENVIRONMENTAL ASSESSMENT FOR RESIDENTIAL CLOTHES WASHERS TABLE OF CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 2. PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-1 3. ALTERNATIVES INCLUDING THE PROPOSED ACTION . . . . . . . . . . . . . . . . . EA-2 3.1 No Action Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.2 Proposed Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-2 3.3 Alternative Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EA-3 3.4 Impacts of Proposed and Alternative Standards

106

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

9 9 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee June 2011 U.S. Department of Energy Oak Ridge Office This page intentionally left blank. DOE/EA-1779 Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Date Issued-June 2011 Bechtel Jacobs Company, LLC and CDM Federal Services Inc. contributed to the preparation of this document and may not be considered for review of the document U.S. Department of Energy Office of Environmental Management This page intentionally left blank. iii CONTENTS FIGURES......................................................................................................................................................

107

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the Interior the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NV-S010-2013-0052-EA DOE/EA-1960 June 28, 2013 Townsite Solar Project Transmission Line PREPARING OFFICE U.S. Department of the Interior Bureau of Land Management Southern Nevada District Office Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, Nevada 702-515-5000 Office 702-515-5010 Fax Environmental Assessment for the Townsite Solar Project DOE/EA-1960 DOI-BLM-NV-S010-2013-0052 EA N-91290 Prepared For U.S. Department of the Interior

108

Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

682 682 Environmental Assessment Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 U.S. Department of Energy Richland, Washington Environmental Assessment February 20 10 DOE/EA- 1682 This page intentionally left blank. 1 February 20 10 DOE/EA- 1682 TABLE OF CONTENTS 1.0 INTRODUCTION..............................................................................1. 1.1 BACKGROUND ......................................................................... 3 1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ......................... 6 1.3 NEPA REQUIREMENTS............................................................... 6 2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE ....................... 8

109

Financial Assessment  

E-Print Network [OSTI]

We would like to thank everyone who helped us with this report, including but not limited to: John Bolduc, Steve Lenkauskas, George Fernandes, and the staff at the City of Cambridge and Danehy Park who helped shape this report and made on-site instrument installation and data collection possible. Mark Lipson, Jack Clarke and Jean Rogers for their guidance with the environmental and community impact assessment. Bob Paine and Scott Abbett for their thoughts and experiences with the Medford McGlynn School wind turbine. This preliminary assessment report investigates the wind resource available at Danehy Park in the City of Cambridge, providing estimated power generation figures as well as cost and revenue estimates and

Cy Chan; Pamela Silva; Chao Zhang

2011-01-01T23:59:59.000Z

110

Biology reflective assessment curriculum  

E-Print Network [OSTI]

I passed back the assessments on natural variation with amultiple-choice assessment on natural selection and naturalI passed back the natural selection assessments with the

Bayley, Cheryl Ann

2011-01-01T23:59:59.000Z

111

Assessor Training Assessment Techniques  

E-Print Network [OSTI]

NVLAP Assessor Training Assessment Techniques: Communication Skills and Conducting an Assessment listener ·Knowledgeable Assessor Training 2009: Assessment Techniques: Communication Skills & Conducting, truthful, sincere, discrete · Diplomatic · Decisive · Selfreliant Assessor Training 2009: Assessment

112

Sea lions, greasepaint and the U-boat threat: Admiralty scientists turn to the music hall in 1916  

Science Journals Connector (OSTI)

...their reasoning powers, which are by no...in actual sea-water, which is changed...state... In the water seals are capable...sat in the side-car of a motor cycle...experiments on the hearing powers of sea-lions under water, and on the possibility...

2001-01-01T23:59:59.000Z

113

Integrated Environmental Assessment Part III: Exposure Assessment  

E-Print Network [OSTI]

as life cycle assessment (LCA) fosters the need for simplepotential. The goal of LCA is to confront and assess impactsLCIA) process within in LCA is a systematic framework in

McKone, Thomas E.; Small, Mitchell J.

2006-01-01T23:59:59.000Z

114

Northwest Energy Market Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Northwest Energy Market Assessment Pages Northwest-Energy-Market-Assessment Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects &...

115

Assessment 610 (37765) Spring 2014  

E-Print Network [OSTI]

Assessment. Students will learn the fundamentals of intellectual and neuropsychological assessment). Comprehensive Handbook of Psychological Assessment: Behavioral Assessment. Wiley & Sons, Inc. Class evaluation

Lockery, Shawn

116

ASSESSMENT FOR THE SOUTHWEST  

E-Print Network [OSTI]

SERVICE CLIMATE CHANGE & CULTURAL RESOURCE PLANNING PROGRAM 17 EARTH SYSTEM MODELS 18 CLIMATE ASSESSMENTS

Wong, Pak Kin

117

LUser_CompetencyAssessment  

Broader source: Energy.gov (indexed) [DOE]

Competency Assessments (Employee) Competency Assessments (Employee) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Participating in Competency Assessments (Employee) Purpose The purpose of this job aid is to guide users and supervisors through the step-by-step process of participating in a competency assessment by viewing gaps, assigning items, conducting a self- assessment, reviewing completed assessments, and viewing the competency history. View Gaps and Assign Items 6 Steps Task A Employee: Conduct Self Assessment 8 Steps Task B Employee: Review Completed Assessment - 6 Steps Task C Employee: View Competency History 11 Steps Task D SuccessFactors Learning v 6.4 User Job Aid Participating in Competency Assessments (Employee)

118

Solar Resource Assessment  

SciTech Connect (OSTI)

This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

2008-02-01T23:59:59.000Z

119

Management Assessment and Independent Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The revision to this Guide reflects current assessment practices, international standards, and changes in the Department of Energy expectations. Cancels DOE G 414.1-1. Canceled by DOE G 414.1-1B.

2001-05-31T23:59:59.000Z

120

Philosophy on Vulnerability Assessments  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capabilities/vat/assess/ capabilities/vat/assess/ ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, 9700 South Cass Ave., Argonne, IL Philosophy on Vulnerability Assessments Argonne Vulnerability Assessment Team Roger G. Johnston, Ph.D., CPP , 630-252-6168 1. There are a number of conventional tools for finding security vulnerabilities. These include security surveys, risk management, design basis threat, CARVER Method, Delphi Method, software vulnerability assessment tools, infrastructure modeling, etc. 2. These tools have some value, and indeed we have used them all. 3. Experience has shown, however, that these methods do not usually result in dramatic improvements to security, nor do they reliably predict catastrophic security incidents that

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Home Energy Assessments  

SciTech Connect (OSTI)

A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

Dispenza, Jason

2010-01-01T23:59:59.000Z

122

Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report  

SciTech Connect (OSTI)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energyâ??s Wind and Hydropower Technologies Programâ??s goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

Craig W. Collar

2012-11-16T23:59:59.000Z

123

Industrial Assessment Center  

SciTech Connect (OSTI)

The University of Dayton (UD) performed energy assessments, trained students and supported USDOE objectives. In particular, the UD Industrial Assessment Center (IAC) performed 96 industrial energy assessment days for mid-sized manufacturers. The average identified and implemented savings on each assessment were $261,080 per year and $54,790 per year. The assessments served as direct training in industrial energy efficiency for 16 UD IAC students. The assessments also served as a mechanism for the UD IAC to understand manufacturing energy use and improve upon the science of manufacturing energy efficiency. Specific research results were published in 16 conference proceedings and journals, disseminated in 22 additional invited lectures, and shared with the industrial energy community through the UD IAC website.

J. Kelly Kissock; Becky Blust

2007-04-17T23:59:59.000Z

124

Industrial Assessment Centers (IACs)  

Broader source: Energy.gov [DOE]

Small- and medium-sized manufacturers may be eligible to receive a no-cost assessment provided by DOE Industrial Assessment Centers (IACs). Teams located at 24 universities around the country conduct the energy audits to identify opportunities to improve productivity, reduce waste, and save energy. Each manufacturer typically identifies about $55,000 in potential annual savings on average. Over 15,000 IAC assessments have been conducted. IACs also train the next-generation of energy savvy engineers.

125

Industrial Energy Efficiency Assessments  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Energy Efficiency Assessments Lynn Price Staff Scientist China Energy Group Energy Analysis Department Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Industrial Energy Efficiency Assessments - Definition and overview of key components - International experience - Chinese situation and recommendations - US-China collaboration Industrial Energy Efficiency Assessments - Analysis of the use of energy and potential for energy efficiency in an industrial facility * Current situation * Recommendations for improving energy efficiency * Cost-benefit analysis of recommended options * An action plan for realizing potential savings Types of Industrial Energy Efficiency Assessments - Preliminary or walk-through - Detailed or diagnostic Audit criteria

126

NATURAL GAS MARKET ASSESSMENT  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION NATURAL GAS MARKET ASSESSMENT PRELIMINARY RESULTS In Support.................................................................................... 6 Chapter 2: Natural Gas Demand.................................................................................................. 10 Chapter 3: Natural Gas Supply

127

Assessment in natural sciences.  

E-Print Network [OSTI]

??This research study focusses on assessment in the Natural Sciences learning area in grades 8 and 9. The aspect under focus is the extent to (more)

Singh, Suresh Kamar

2009-01-01T23:59:59.000Z

128

ESCO PRELIMINARY ASSESSMENT TEMPLATE  

Broader source: Energy.gov [DOE]

Document presents a template and example to help energy service companies (ESCOs) conduct preliminary assessments required for Federal energy savings performance contract (ESPC) projects.

129

Hoisting & Rigging Assessment Form  

Broader source: Energy.gov [DOE]

Assess the institutional and department/division hoisting and rigging (including forklift, overhead cranes small hoists, and mobile cranes) requirements, policies, procedures, and work practices...

130

Technology Readiness Assessment Report  

Broader source: Energy.gov [DOE]

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

131

Assessment for Final Report  

E-Print Network [OSTI]

Community Tourism Assessment for Lindstrom, Minnesota Final Report May 2008 Prepared for of the University of Minnesota Extension and College of Food, Agricultural & Natural Resource Sciences #12; INTRODUCTION 1 DATA USED IN THE TOURISM ASSESSMENT 2 TOURISM-RELATED DATA FOR LINDSTROM 2 REFERENCES TO TOURISM

Amin, S. Massoud

132

Training Needs Assessment Presentation  

Broader source: Energy.gov [DOE]

The TNA PowerPoint Presentation is targeted for the training points of contacts whose organization's participate in the DOE training needs assessment (TNA). This presentation goes over how the training needs assessment (TNA) is done and the components of the TNA data collection tool.

133

DOEEA-1203 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

203 203 ~ Environmental Assessment Trench 33 Widening in 21 8-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington ENVIRONMENTAL ASSESSMENT FOR TRENCH 33 WIDENING IN 21 8-W-5 LOW-LEVEL BURIAL GROUND, HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY RICHLAND, WASHINGTON JULY 1997 U.S. Department o f Energy DOE/ EA- 1203 This page intentionally left blank. Envi ronmental Assessment J u l y 1997 Portions of this document m y be iliegiile i n electronic image prodads. b a g s are pFoduced from the best adhble original dOCUXllent, DOE/EA-1203 U.S. Department o f Energy Preface PREFACE This envi ronmental assessment (EA) has been prepared t o assess potential environmental impacts associated with the U.S. Department o

134

Hygienic surveillance in swimming pools: Assessment of the water quality in Bologna facilities in the period 20102012  

Science Journals Connector (OSTI)

Abstract In the three-year period 20102012, 80 public swimming facilities in the metropolitan area of Bologna (Emilia Romagna Region, Italy), including 144 pools (69 indoor, 75 outdoor), were monitored to assess the microbiological and chemical water quality, after about ten years of implementing the new Italian guidance which introduced the principles of internal safety plans in the surveillance of swimming pools. According to the Italian guidance, water samples were collected from supply water (370 samples), pool water (645), and recirculating water entering the pool (307). The samples of supply water always conformed to the microbiological limits for drinking water. The pool water did not conform to the Italian legal requirements in around 16% of indoor pools and 25% of outdoor pools. In 65% of non-compliant samples, only one parameter exceeded the required standards. The microorganisms of faecal origin were isolated very rarely (Enterococci in less than 2% of samples) and pH and residual chlorine showed good compliance in pool water, implying an efficient management of the internal control. The inlet water exceeded the required standards in about 36% and 50% of samples, respectively in indoor and outdoor pools. However, 83.6% of the corresponding samples of pool water met the required limits. The microbiological incongruities were prevalently due to high levels of total heterotrophic counts (THCs) and Pseudomonas aeruginosa, and were indicative of bacterial colonization of the filters. The sampling of inlet water can thus be indicated as a critical control point for checking the correct functioning of the filters. The non-conformity of samples led to pool closure only in 1.5% of cases. In the other cases, the operators were officially invited to perform the corrective measures previously established in the plan of risk assessment. On the whole, the approach based on internal safety plans produced satisfactory results in terms of pool water quality, demonstrating the effective working of the internal system of analysis and management of risks.

L. Dallolio; M. Belletti; A. Agostini; M. Teggi; M. Bertelli; C. Bergamini; L. Chetti; E. Leoni

2013-01-01T23:59:59.000Z

135

FINAL ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

January 2013 January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office JANUARY 2013 DOE/EA-1923 iv January 2013 FINAL ENVIRONMENTAL ASSESSMENT for the GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office January 2013 DOE/EA-1923 v January 2013 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Final Environmental Assessment for the Green Energy School Wind Project (DOE/EA-1923) CONTACT: For additional copies or more information on this final Environmental Assessment (EA),

136

IAAP Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

NEEDS ASSESSMENT-DECEMBER 2001 NEEDS ASSESSMENT-DECEMBER 2001 Burlington Atomic Energy Commission Plant- Former Worker Program A US DOE funded project conducted by: Dr. Laurence Fuortes, Principal Investigator The University of Iowa College of Public Health Department of Occupational and Environmental Health 5 2940 Steindler Building Iowa City, IA 52242 TEL: 319 335 9819 FAX: 319 335 9200 BACEP-FWP Needs Assessment 1. INTRODUCTION In August of 2000, the University of Iowa College of Public Health initiated a needs assessment study to evaluate whether or not individuals formerly employed by the Department of Energy (DOE) at the Iowa Army Ammunition Plant (IAAP) near Burlington, Iowa, would benefit from a Former Worker Medical Surveillance Program. These workers were employed at IAAP in the atomic weapons industry on what was known at the facility as Line 1 or Division B at the

137

Risk Assess - updated  

Broader source: Energy.gov (indexed) [DOE]

Software Development Risk Assessment Software Development Risk Assessment Note: The purpose of this prompt list is to provide project managers with a tool for identifying and planning for potential project risks. It is process-based and supports the framework established by the DOE Software Engineering Methodology. It will be used within the stage exit process as an additional tool to ensure that the project manager has identified and is managing known risk factors. Additional detailed information describes the various risk factors and how to score them. Performing a risk assessment is an important step in being prepared for potential problems that can occur within any software project. During the risk assessment, if a potential risk is identified, a solution or plan of action should be developed. (A problem analyzed and planned

138

Preliminary Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1731 Bonneville Power Administration May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Revision Sheet for Final Environmental Assessment Revision Sheet for the Walla Walla-Tucannon River Transmission Line Rebuild Project Final Environmental Assessment DOE/EA-1731 Summary This revision sheet documents the changes to be incorporated into the Walla Walla-Tucannon River Transmission Line Rebuild Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final

139

Training Self-Assessment  

Broader source: Energy.gov [DOE]

This document contains four self-assessment forms that are aligned with the Home Energy Professional Certifications. These forms will help individuals gauge competency and identify training needs before an exam is taken.

140

Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

2011-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Pumping System Assessment Tool  

Broader source: Energy.gov [DOE]

The Pumping System Assessment Tool (PSAT) is a free online software tool to help industrial users assess the efficiency of pumping system operations. PSAT uses achievable pump performance data from Hydraulic Institute standards and motor performance data from the MotorMaster+ database to calculate potential energy and associated cost savings. The tool also enables users to save and retrieve log files, default values, and system curves for sharing analyses with other users.

142

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

143

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

144

Pumping System Assessment Tool Overview  

Broader source: Energy.gov [DOE]

This power point presentation provides an overview of AMO's pumping system assessment tool (PSAT) that is used during energy savings assessments at large industrial facilities.

145

Industrial Energy Efficiency Assessments | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Industrial Energy Efficiency Assessments Industrial Energy Efficiency Assessments Details about the Industrial Energy Efficiency Assessments program and its implementation in...

146

National Geothermal Resource Assessment and Classification |...  

Broader source: Energy.gov (indexed) [DOE]

Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification presentation...

147

Cognitive-Developmental Assessments 1 Designing Cognitive-Developmental Assessments  

E-Print Network [OSTI]

Cognitive-Developmental Assessments 1 Designing Cognitive-Developmental Assessments: A Case Study or quote without permission of the authors. #12;Cognitive-Developmental Assessments 2 Designing Cognitive in designing this assessment system is establishing a cognitive-developmental map in which age

Junker, Brian

148

Image Utility Assessment and a Relationship with Image Quality Assessment  

E-Print Network [OSTI]

Image Utility Assessment and a Relationship with Image Quality Assessment David M. Rouse , Romuald information to humans, and this paper investigates the utility assessment task, where human observers evaluate the usefulness of a natural image as a surrogate for a reference. Current QA algorithms implicitly assess utility

Hemami, Sheila S.

149

Small UHV-compatible gas inlet unit  

Science Journals Connector (OSTI)

A simple versatile device is described for introducing a dose of a selected pure gas into an UHV system.

S Koc

1987-01-01T23:59:59.000Z

150

Bioenergy Assessment Toolkit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte Produced under direction of the United States Agency for International Development by the National Renewable Energy Laboratory (NREL) under Interagency Agreement AEG-P-00-00003-00; Work for Others Agreement number 3010543; Task Numbers WFE2.1012, WFE2.1013, and WFE2.1014. Technical Report NREL/TP-6A20-56456 October 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 303-275-3000 * www.nrel.gov Bioenergy Assessment Toolkit Anelia Milbrandt and Caroline Uriarte

151

TECHNOLOGY READINESS ASSESSMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

152

PRIVACY IMPACT ASSESSMENT: Office  

Broader source: Energy.gov (indexed) [DOE]

Office Office of Workforce Development for Teachers and Scientists Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextineword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site August 1, 2009 U.S. Department of Energy; Office of Science; Office of Workforce Development for Teachers and Scientists (WDTS) System location - Pacific Northwest National Laboratory, Richland, WA Name of Information iPASS System for DOE Office of Science laboratory fellowship programs, including

153

Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

154

DRAFT ENVIRONMENTAL ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

4 4 FINAL ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO RECORD HILL WIND LLC FOR CONSTRUCTION OF A WIND ENERGY PROJECT IN ROXBURY, MAINE U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 July 2011 DOE/EA-1824 i EXECUTIVE SUMMARY INTRODUCTION The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to Record Hill Wind LLC (Record Hill) for the construction of a 50.6 megawatt (MW) wind energy project located in Roxbury, Maine. 1 DOE has prepared this Final Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) (42 United States Code [USC] 4321, et. seq.) Council on Environmental Quality regulations for implementing NEPA (40 Code of Federal Regulations

155

PRIVACY IMPACT ASSESSMENT: Office  

Broader source: Energy.gov (indexed) [DOE]

Office Office of Information Resources - FOIAXpress Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Depamnf!l1tal Elel1l~nt&$ite july 23, 2009 Office of Information Resources Office of Management DOE Headquarters, Germantown, Germantown Computer Center Server Room Nameonl1fol'l11i1tion Sysleijlprl'f 'Project FOIAXpress ExhibitProj~tUID TBD NeWPIA ~ Update D Please indicate whether this is a new

156

Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

157

National Climate Assessment: Production Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NCA & Development Advisory Committee NCA & Development Advisory Committee Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Production Team Print E-mail National Climate Assessment Staff (USGCRP National Coordination Office) Current NCA Staff Dr. Fabien Laurier, Director, Third National Climate Assessment Dr. Glynis Lough, Chief of Staff for the National Climate Assessment Emily Therese Cloyd, Engagement Coordinator for the National Climate Assessment Bryce Golden-Chen, Program Coordinator for the National Climate Assessment Alison Delgado, Scientist Dr. Ilya Fischhoffkri, Scientist Melissa Kenney, Indicators Coordinator Dr. Fred Lipschultz, Regional Coordinator for the National Climate Assessment

158

Venetie, Alaska energy assessment.  

SciTech Connect (OSTI)

This report summarizes the Energy Assessment performed for Venetie, Alaska using the principals of an Energy Surety Microgrid (ESM) The report covers a brief overview of the principals of ESM, a site characterization of Venetie, a review of the consequence modeling, some preliminary recommendations, and a basic cost analysis.

Jensen, Richard Pearson; Baca, Micheal J.; Schenkman, Benjamin L.; Brainard, James Robert

2013-07-01T23:59:59.000Z

159

Rutgers University Environmental Assessment  

E-Print Network [OSTI]

, chemical use, water use, and sustainable materials management into MTCO2e. The EPA WARM Model which helpsRutgers University Environmental Assessment: MOU SemiAnnual Report May 31, 2013 Environmental) pledging to become an environmental steward by implementing a number of green initiatives that would reduce

Hanson, Stephen José

160

Rutgers University Environmental Assessment  

E-Print Network [OSTI]

for electricity, green energy, fuel use, chemical use, water use, and sustainable materials management into MTCO2eRutgers University Environmental Assessment: MOU SemiAnnual Report November 4, 2011 Environmental) pledging to become an environmental steward by implementing a number of green initiatives that would reduce

Delgado, Mauricio

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Demand Response Assessment INTRODUCTION  

E-Print Network [OSTI]

Demand Response Assessment INTRODUCTION This appendix provides more detail on some of the topics raised in Chapter 4, "Demand Response" of the body of the Plan. These topics include 1. The features, advantages and disadvantages of the main options for stimulating demand response (price mechanisms

162

Fan System Assessment Tool  

Broader source: Energy.gov [DOE]

The Fan System Assessment Tool (FSAT) is a free online software tool that helps industrial users quantify energy use and savings opportunities in industrial fan systems. Use FSAT to understand how well your fan systems are operating, determine the economic benefit of system modifications, and establish which options are most economically viable when multiple opportunities exist for system modification.

163

Assessments A Training Manual  

E-Print Network [OSTI]

manufacturing plant. The energy auditor now finds skills sharpened for the energy side of the business inadequate for the entire process although intuitive observations from energy auditors, which have led and Energy Assessment Original Version: December 1995; Updated Version: September 2001 #12;#12;iii Preface

164

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

165

Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

166

Survey of Biomass Resource Assessments and Assessment Capabilities in APEC  

Open Energy Info (EERE)

Assessments and Assessment Capabilities in APEC Assessments and Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Biomass Topics Resource assessment Website http://www.nrel.gov/internatio Country Australia, Brunei, Canada, Chile, China, Indonesia, Japan, South Korea, Malaysia, Mexico, New Zealand, Papua New Guinea, Peru, Philippines, Russia, Chinese Taipei, Thailand, United States, Vietnam Australia and New Zealand, South-Eastern Asia, Northern America, South America, Eastern Asia, South-Eastern Asia, Eastern Asia, Eastern Asia, South-Eastern Asia, Central America, Australia and New Zealand, Melanesia, South America, South-Eastern Asia, Eastern Europe, , South-Eastern Asia, Northern America, South-Eastern Asia

167

Energy Assessment Results: Most Commonly Identified Recommendations  

Broader source: Energy.gov [DOE]

The Missouri Industrial Assessment Center shares its experience providing energy assessments to local industry.

168

Tidal Residual Eddies and their Effect on Water Exchange in Puget Sound  

SciTech Connect (OSTI)

Tidal residual eddies are one of the important hydrodynamic features in tidally dominant estuaries and coastal bays, and they could have significant effects on water exchange in a tidal system. This paper presents a modeling study of tides and tidal residual eddies in Puget Sound, a tidally dominant fjord-like estuary in the Pacific Northwest coast, using a three-dimensional finite-volume coastal ocean model. Mechanisms of vorticity generation and asymmetric distribution patterns around an island/headland were analyzed using the dynamic vorticity transfer approach and numerical experiments. Model results of Puget Sound show that a number of large twin tidal residual eddies exist in the Admiralty Inlet because of the presence of major headlands in the inlet. Simulated residual vorticities near the major headlands indicate that the clockwise tidal residual eddy (negative vorticity) is generally stronger than the anticlockwise eddy (positive vorticity) because of the effect of Coriolis force. The effect of tidal residual eddies on water exchange in Puget Sound and its sub-basins were evaluated by simulations of dye transport. It was found that the strong transverse variability of residual currents in the Admiralty Inlet results in a dominant seaward transport along the eastern shore and a dominant landward transport along the western shore of the Inlet. A similar transport pattern in Hood Canal is caused by the presence of tidal residual eddies near the entrance of the canal. Model results show that tidal residual currents in Whidbey Basin are small in comparison to other sub-basins. A large clockwise residual circulation is formed around Vashon Island near entrance of South Sound, which can potentially constrain the water exchange between the Central Basin and South Sound.

Yang, Zhaoqing; Wang, Taiping

2013-08-30T23:59:59.000Z

169

Integrated Assessment | Open Energy Information  

Open Energy Info (EERE)

Integrated Assessment Integrated Assessment Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Integrated Assessment: Mainstreaming sustainability into policymaking--A guidance manual Agency/Company /Organization: United Nations Environment Programme Topics: Background analysis Website: www.unep.ch/etb/publications/AI%20guidance%202009/UNEP%20IA%20final.pd Equivalent URI: cleanenergysolutions.org/content/times-integrated-assessment-model-0,h Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance References: Integrated Assessment[1] The Times Integrated Assessment Model (TIAM) comprises several thousand technologies in all sectors of the energy system. It is characterized by several technical and economic parameters and by emission coefficients for

170

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network [OSTI]

Standards will offer industrial facilities seeking certification a well-defined path toward improved energy intensity. System Assessment Standards will help define the market for both users and providers of industrial system assessment services. Use...

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

171

EV Guideline Assessment Templates  

Broader source: Energy.gov (indexed) [DOE]

EV Guideline Assessment Templates EV Guideline Assessment Templates |1. Process: Organization |2. Guideline No: 1|3. Contractor: |4.Contract/project(s): | ||||| ||||| |5. Guideline Statement: Define the authorized work elements for the program. A work breakdown structure (WBS), tailored for effective internal management control, is commonly used in this process. | || |6. Documentation Required: 1) CLINs 2) WBS 3) WBS Dictionary | || || || |7. Instructions: Why this is important: The WBS represents the entire scope of work in the project, a "picture" of the work. The first level is the total system, and it continues down in successively smaller elements until it reaches the level of detail necessary for management action and control. This picture of the work is needed to facilitate traceability, ensure the

172

DOEEA-1177 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

7 7 Environmental Assessment SalvageDemolition of 200 West Area, 200 East Area and 300 Area Steam Plants, Hanford Site, Richland, Washington U.S. Department of Energy Richland, Washington October 1996 DOE/EA-1177 ENVIR0NMEN"AL ASSESSMENT' FOR THE SALVAGE/DEMOLITION OF 200 WEST AREA, '200 EAST AREA, AND 300 AREA STEAM PLANTS U . S . DEPARTMENT OF ENERGY RICHLAND, WASHINGTON OCTOBER 1996 DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available origid document. DOE/EA- 1177 U.S. Department o f Energy Preface Appendices. Additional information necessary t o support an understanding of the proposed action, a1 ternati ves , and potenti a1 impacts i s provided. Comments resul ti.ng from review o

173

Guidelines for Exposure Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Z-92/001 Z-92/001 May 1992 Guidelines for Exposure Assessment Published on May 29, 1992, Federal Register 57(104):22888-22938 These guidelines replace the previously issued final Guidelines for Estimating Exposures (September 24, 1986), Federal Register 51(185):34042-34054, and the Proposed Guidelines for Exposure-Related Measurements (December 2, 1988), Federal Register 53(232):48830- 48853. Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Note: This document represents the final guidelines. A number of editorial corrections have

174

National Climate Assessment: Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Production Team Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Overview Print E-mail What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

175

needs_assessment.html  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Education Office Needs Assessment Workshop Education Office Needs Assessment Workshop On October 2, 40 educators from 15 school districts met at Fermilab to discuss the status of science education in the context of state and national frameworks. Districts were selected at random from DuPage and Kane counties, and superintendents selected a team to represent the district at the workshop. The group provided input to the Education Office regarding future program direction. Over the next few months the Education Office will be reviewing program offerings in light of the issues raised below. In the meantime, we invite you to visit the Teacher Resource Center which serves as our clearinghouse or call Susan Dahl at 630-840-3094 for assistance. If you would like a scientist to visit your classroom, participate in a career fair or serve as

176

Oil Market Assessment  

Gasoline and Diesel Fuel Update (EIA)

Logo Oil Market Assessment - September Logo Oil Market Assessment - September 12, 2001 EIA Home Page Based on Energy Information Administration (EIA) contacts and trade press reports, overall U.S. and global oil supplies appear to have been minimally impacted by yesterday's terrorist attacks on the World Trade Center and the Pentagon. Rumors of scattered closures of U.S. refineries, pipelines, and terminals were reported, and Louisiana Offshore Oil Port operations were partially suspended. While the NYMEX and New York Harbor were temporarily closed, operations are expected to resume soon. Most, if not all petroleum industry infrastructure is expected to resume normal operations today or in the very near term. Prices at all levels (where markets were open) posted increases yesterday, but many prices fell today, as initial reactions

177

Pantex Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Pantex Needs Assessment Pantex Needs Assessment Phase I Summary and Recommendation Based upon the availability of information to access former workers, and given the knowledge regarding past exposures to hazardous agents, it is recommended that a Phase II examination program be established for former Pantex workers. This will be in keeping with other DOE mandates and programs, and will assist with the current DOE compensation program. I. Introduction and Background The Department of Energy has established a program to meet the medical oversight needs of former workers who worked at a variety of Department of Energy facilities in connection with the nuclear programs of the United States. It has been recognized that these workers might have been exposed to potentially hazardous materials, and that they were deserving of medical

178

LANL Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

179

DOEM-1123 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

DOEM-1123 DOEM-1123 Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washin%E E ~ U.S. Department of Energy Richland, Washington November 1995 DOE/EA - 1 123 ENVIRONMENTAL ASSESSMENT TRANSFER OF NORMAL AND LOW-ENRICHED URANIUM BILLETS TO THE UNITED KINGDOM HANFORD SITE, RICHLAND, WASHINGTON U.S. DEPARTMENT OF ENERGY NOVEMBER 1995 This page intentionally left blank. U.S. Department of Energy Glossary Glossary Acronyms and Ini ti a1 isms ALARA BNFL CERL CFR CY DOE DOH DOT EA FR IAEA IMO I so LCF LEU LSA NAC NCRP NEA , NEPA PNL rem WAC WHC As Low As Reasonably Achievable British Nuclear Fuels Limited, Inc. Construction Engineering Resources Laboratory Code o f Federal Regulations Calendar Year

180

LANL Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOEEA-0984 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

0984 0984 Environmental Assessment Environmental Assessment for the Deactivation of the N Reactor Facilities U.S. Department of Energy Richland, Washington May 1995 \ lR4DEMARK DISCLAIMER Reference herein to any specific wmmercial product, process. M m M c e by trade name, uademark, manufacturer. or otherwise, does not necessariiy collbuNte M imply ~ f s endorsement, rewmmendation. or favoring by the Unrted States Government or any agency thereof or I u Contractors M subcontractors Ths repon has been reproduced from the best available copy Available m peper copy and microfiche Available to and contract~s from Office of Scienufic and Technical Information P O Box62 Oak hdge, TN 37831 161 51 576-8401 Available to the public from the U S Department of Commerce

182

Mercury Risk Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED ASSESSING THE MERCURY HEALTH RISKS ASSOCIATED WITH COAL-FIRED POWER PLANTS: IMPACTS OF LOCAL DEPOSITIONS *T.M. Sullivan 1 , F.D. Lipfert 2 , S.M. Morris 2 , and S. Renninger 3 1 Building 830, Brookhaven National Laboratory, Upton, NY 11973 2 Private Consultants 3 Department of Energy, National Energy Technology Laboratory, Morgantown, WV ABSTRACT The U.S. Environmental Protection Agency has announced plans to regulate emissions of mercury to the atmosphere from coal-fired power plants. However, there is still debate over whether the limits should be placed on a nationwide or a plant-specific basis. Before a nationwide limit is selected, it must be demonstrated that local deposition of mercury from coal-fired power plants does not impose an excessive local health risk. The principal health

183

1986 Cogeneration Market Assessment  

E-Print Network [OSTI]

implementation path such as changing energy general direction. prices, tax laws, FERC decisions, avoided costs, permitting etc., the cogeneration industry is What's missing is usually the meaning of th still strong. market assessment to the end user... increases and paper production which is basically a solid fuel fired steam turbine market will increase, thus increasing the application of steam turbines. Lastly, in the refuse market probably the least effect of lower oil prices will occur. Energy...

Wallace, D. G.

184

Waste minimization assessment procedure  

SciTech Connect (OSTI)

Perry Nuclear Power Plant began developing a waste minimization plan early in 1991. In March of 1991 the plan was documented following a similar format to that described in the EPA Waste Minimization Opportunity Assessment Manual. Initial implementation involved obtaining management's commitment to support a waste minimization effort. The primary assessment goal was to identify all hazardous waste streams and to evaluate those streams for minimization opportunities. As implementation of the plan proceeded, non-hazardous waste streams routinely generated in large volumes were also evaluated for minimization opportunities. The next step included collection of process and facility data which would be useful in helping the facility accomplish its assessment goals. This paper describes the resources that were used and which were most valuable in identifying both the hazardous and non-hazardous waste streams that existed on site. For each material identified as a waste stream, additional information regarding the materials use, manufacturer, EPA hazardous waste number and DOT hazard class was also gathered. Once waste streams were evaluated for potential source reduction, recycling, re-use, re-sale, or burning for heat recovery, with disposal as the last viable alternative.

Kellythorne, L.L. (Centerior Energy, Cleveland, OH (United States))

1993-01-01T23:59:59.000Z

185

Context for performance assessment  

SciTech Connect (OSTI)

In developing its recommendations on performance assessment for disposal of low-level radioactive waste, Scientific committee 87-3 of the National Council on Radiation Protection and Measurements (NCRP) has considered a number of topics that provide a context for the development of suitable approaches to performance assessment. This paper summarizes the Committee` discussions on these topics, including (1) the definition of low-level waste and its sources and properties, as they affect the variety of wastes that must be considered, (2) fundamental objectives and principles of radioactive waste disposal and their application to low-level waste, (3) current performance objectives for low-level waste disposal in the US, with particular emphasis on such unresolved issues of importance to performance assessment as the time frame for compliance, requirements for protection of groundwater and surface water, inclusion of doses from radon, demonstrating compliance with fixed performance objectives using highly uncertain model projections, and application of the principle that releases to the environment should be maintained as low as reasonably achievable (ALARA), (4) the role of active and passive institutional controls over disposal sites, (5) the role of the inadvertent human intruder in low-level waste disposal, (6) model validation and confidence in model outcomes, and (7) the concept of reasonable assurance of compliance.

Kocher, D.C.

1997-04-01T23:59:59.000Z

186

Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary  

E-Print Network [OSTI]

Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary Step 10 Name · Accessibility of woodlands and natural spaces: Addressing crime and safety issues. O'Brien and Tabbush, Forest. Forestry Commission Wales #12;Forestry Commission Equality Impact Assessment 2 DISABILITY · Forestry

187

Secretarial Review Draft Environmental Assessment/  

E-Print Network [OSTI]

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

188

Standards and Conformity Assessment Training  

E-Print Network [OSTI]

Standards and Conformity Assessment Training Workshops for Government Agencies Fundamentals of Standards and Conformity Assessment Training for all levels of government NIST offers interactive workshops and seminars for federal, state, and local government agencies on the fundamentals of standards, conformity

189

Model Fire Protection Assessment Guide  

Broader source: Energy.gov [DOE]

This Assessment guide covers the implementation of the DOE's responsibility of assuring that DOE and the DOE Contractors have established Fire Protection Programs that are at the level required for the area being assessed.

190

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Risk Assessment Documents - ORR Risk Assessment Documents - ORR Bullet Baseline Risk Assessments Bullet Remedial Investigation/Feasibility Study Environmental Assessment Report South Campus Facility, Oak Ridge Tenn [DOE/OR/02-1274&D] Bullet Baseline Risk Assessment for Lower East Fork Poplar Creek [DOE/OR/1119 & D2 & V2] Bullet Remedial Investigation/ Feasibility Study Report for Lower Watts Bar Reservoir Operable Unit [DOE/OR/01 1282 & D1] [ORNL/ER-2] Bullet The Utility of Existing Data Conducting a CERCLA Baseline Risk Assessment for Lower Watts Bar Reservoir (draft) [ORNL/ER-?] Bullet East Fork Poplar Creek Sewer Line Beltway Remedial Investigation Report [DOE/OR/02-1119&D2] Bullet Screening Risk Assessments Bullet Preliminary Assessment of Radiation Doses to the Public from Cesium

191

EA-1906: Draft Environmental Assessment  

Broader source: Energy.gov [DOE]

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

192

DOE limited standard: Operations assessments  

SciTech Connect (OSTI)

Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

NONE

1996-05-01T23:59:59.000Z

193

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

2 Key Calendar Dates in Colorado's Compact Apportionments 5 #12;1 Western Water AssessmentWESTERN WATER ASSESSMENT WHITE PAPER The Effect of Changing Hydrographs on Compact Apportionments in the Western United States: A Preliminary Analysis of Potential Trouble-Spots Western Water Assessment Working

Neff, Jason

194

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

WESTERN WATER ASSESSMENT WHITE PAPER Assessing Measures of Drought Impact and Vulnerability in the Intermountain West by William R. Travis, Kristin Gangwer, and Roberta Klein July 2011 #12;Western Water. Travis Kristin Gangwer Roberta Klein Western Water Assessment and Center for Science and technology

Neff, Jason

195

Assessor Training NVLAP Assessment Forms  

E-Print Network [OSTI]

NVLAP Assessor Training NVLAP Assessment Forms #12;Assessor Training 2009: NVLAP Assessment Forms 2 Summary ·Test Method Review Summary ·ProgramSpecific Checklists Examples #12;Assessor Training 2009: NVLAP are completed · Assessor Names, Dates, Lab Code #12;Assessor Training 2009: NVLAP Assessment Forms 4 NIST

196

Assessment of Demand Response Resource  

E-Print Network [OSTI]

Assessment of Demand Response Resource Potentials for PGE and Pacific Power Prepared for: Portland January 15, 2004 K:\\Projects\\2003-53 (PGE,PC) Assess Demand Response\\Report\\Revised Report_011504.doc #12;#12;quantec Assessment of Demand Response Resource Potentials for I-1 PGE and Pacific Power I. Introduction

197

A framework for combining social impact assessment and risk assessment  

SciTech Connect (OSTI)

An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, risk and social impact assessment (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: A hybrid model to combine SIA and SRA namely RSIA is proposed. RSIA can provide the proper mechanism to assess social impacts of natural hazards. RSIA can play the role of ex-post as well as ex-ante assessment. For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany) [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany)] [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany)] [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)] [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

2013-11-15T23:59:59.000Z

198

TEPP Planning Products Model Needs Assessment Self Assessment Document  

Broader source: Energy.gov (indexed) [DOE]

Planning Products Planning Products Model Needs Assessment Self Assessment Document Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-13.p65 1 Model Needs Assessment R E V 8 - 0 7 / 2 0 1 2 T r a n s p o r t a t i o n E m e r g e n c y P r e p a r e d n e s s P r o g r a m PURPOSE The purpose of this Model Needs Assessment is to assist state, tribal, or local officials in determining emergency responder readiness for response to a transportation accident involving radioactive material. 1.0 INTRODUCTION This Model Needs Assessment was developed by the Department of Energy's Transportation Emergency Preparedness Program (TEPP) as a planning and assessment tool for state, tribal, or local government officials. To implement this Model Needs Assessment, a designated official

199

Damodar Valley Corporation, Chandrapura Unit 2 Thermal Power Station Residual Life Assessment Summary report  

SciTech Connect (OSTI)

The BHEL/NTPC/PFC/TVA teams assembled at the DVC`s Chadrapura station on July 19, 1994, to assess the remaining life of Unit 2. The workscope was expanded to include major plant systems that impact the unit`s ability to sustain generation at 140 MW (Units 1-3 have operated at average rating of about 90 MW). Assessment was completed Aug. 19, 1994. Boiler pressure parts are in excellent condition except for damage to primary superheater header/stub tubes and economizer inlet header stub tubes. The turbine steam path is in good condition except for damage to LP blading; the spar rotor steam path is in better condition and is recommended for Unit 2. Nozzle box struts are severely cracked from the flame outs; the cracks should not be repaired. HP/IP rotor has surface cracks at several places along the steam seal areas; these cracks are shallow and should be machined out. Detailed component damage assessments for above damaged components have been done. The turbine auxiliary systems have been evaluated; cooling tower fouling/blockage is the root cause for the high turbine back pressure. The fuel processing system is one of the primary root causes for limiting unit capacity. The main steam and hot reheat piping systems were conservatively designed and have at least 30 years left;deficiencies needing resolution include restoration of insulation, replacement of 6 deformed hanger clamp/bolts, and adjustment of a few hanger settings. The cold reheat piping system is generally in good condition; some areas should be re-insulated and the rigid support clamps/bolts should be examined. The turbine extraction piping system supports all appeared to be functioning normally.

NONE

1995-02-01T23:59:59.000Z

200

Chapter Three - Pipeline Reliability Assessment  

Science Journals Connector (OSTI)

Abstract Another aspect of pipeline integrity management is the assessment of system reliability over the age of the pipeline. In order to assess the aging effects through the pipes lifetime, a reliability assessment is carried out for the pipeline or its segment. The assessment of the residual stress effect is carried out by evaluating the reliability of new uncorroded pipelines, which are assumed to be free from any flaw. The influence of residual stress parameters, mean, and coefficient of variation are considered in the reliability assessment.

Ramesh Singh

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Environmental Assessment of Facility  

Broader source: Energy.gov (indexed) [DOE]

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

202

Technology Readiness Assessments | Department of Energy  

Office of Environmental Management (EM)

Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download August 1, 2013 Technology Readiness Assessment (TRA)Technology Maturation Plan...

203

Hydropower Resource Assessment and Characterization | Department...  

Energy Savers [EERE]

Assessment and Characterization Hydropower Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the total technically...

204

Energy Assessment Results: Most Commonly Identified Recommendations...  

Broader source: Energy.gov (indexed) [DOE]

Assessment Results: Most Commonly Identified Recommendations The Missouri Industrial Assessment Center shares its experience providing energy assessments to local industry. Energy...

205

Industrial Assessment Centers Quarterly Update, Spring 2014 ...  

Broader source: Energy.gov (indexed) [DOE]

Assessment Centers Quarterly Update, Spring 2014 Read the Industrial Assessment Centers (IAC) Quarterly Update -- Spring 2014 Industrial Assessment Centers (IAC) Quarterly Update...

206

Portsmouth Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Portsmouth Needs Assessment May 2003 This Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers was developed...

207

Savannah River Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and concerns for the site. Savannah River Needs Assessment More Documents & Publications Oak Ridge Reservation Needs Assessment Oak Ridge Y-12 and ORNL Needs Assessment Former...

208

Paducah Needs Assessment | Department of Energy  

Office of Environmental Management (EM)

Assessment Paducah Needs Assessment October 1997 This Needs Assessment for former Oak Ridge K-25, Paducah, and Portsmouth Gaseous Diffusion Plant production workers was developed...

209

Assessment of Initial Test Conditions for Experiments to Assess Irradiation  

Broader source: Energy.gov (indexed) [DOE]

Assessment of Initial Test Conditions for Experiments to Assess Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Assessment of Initial Test Conditions for Experiments to Assess Irradiation Assisted Stress Corrosion Cracking Mechanisms Irradiation-assisted stress corrosion cracking is a key materials degradation issue in today's nuclear power reactor fleet and affects critical structural components within the reactor core. The effects of increased exposure to irradiation, stress, and/or coolant can substantially increase susceptibility to stress-corrosion cracking of austenitic steels in high-temperature water environments. Despite 30 years of experience, the underlying mechanisms of Irradiation Assisted Stress Corrosion Cracking (IASCC) are unknown. Extended service conditions will increase the exposure

210

Superfund Exposure Assessment Manual  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-881001 1-881001 OSWER Directive 9285.5-1 April 1988 Superfund Exposure Assessment Manual U.S. Environmental Protection Agency Office of Remedial Response Washington, DC 20460 Notice This report was prepared under contract to an agency of the United States Government. Neither the United States Government nor any of its employees, contractors, subcontractors, or their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party' s use of or the results of such use of any information, apparatus, product, or process disclosed in this report, or represents that its use by such third party would not infringe on privately owned rights. ii Table of Contents Chapter Page List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

211

DOEYEA-0856 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

DOEYEA-0856 DOEYEA-0856 Environmental Assessment for Construction and Operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory Berkeley, California December 1994 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recom-

212

Preliminary Safety Assessment Document  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LCSAD-001, Ver. 2 LCSAD-001, Ver. 2 Linac Commissioning Safety Assessment Document for the National Synchrotron Light Source II Photon Sciences Directorate Version 2 May 11, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II ii LT-C-ESH-LCSAD-001 ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

213

Draft Supplemental Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

214

Minority energy assessment report  

SciTech Connect (OSTI)

The purpose of this research is to project household energy consumption, energy expenditure, and energy expenditure as share of income for five population groups from 1991 to 2009. The approach uses the Minority Energy Assessment Model (MEAM), developed by Argonne National Laboratory for the US Department of Energy's Office of Minority Economic Impact. The MEAM provides a framework that can be used to forecast regional energy consumption and energy expenditure for majority, black, Hispanic, poor, and nonpoor households. The forecasts of key macroeconomic and energy variables used as exogenous variables in the MEAM were obtained from the Data Resources, Inc., Macromodel and Energy Model. Generally, the projections of household energy consumption, expenditure, and energy expenditure as share of income vary across population groups and census regions.

Teotia, A.P.S.; Poyer, D.A.; Lampley, L.; Anderson, J.L.

1992-12-01T23:59:59.000Z

215

Draft Enivonmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

216

Preliminary Safety Assessment Document  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BCSAD-001 BCSAD-001 Photon Sciences Directorate Booster Commissioning Safety Assessment Document For the National Synchrotron Light Source II Version 2 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 ii National Synchrotron Light Source II Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any

217

DOEIEA-1086 Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

86 86 Environmental Assessment for Amendments to 10 CFR Part 835 DISCLAIMER Portions of this document may be illegible i n electronic image products. Images are produced f h m the best avaiIable original document. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employes, makes any warranty, express or implied, or a s s u m e s any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spc- cific commercial product, process, or senrice by trade name, trademark, manufac-

218

Assess Oportunities | Open Energy Information  

Open Energy Info (EERE)

Assess Oportunities Assess Oportunities Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

219

UAIEE and Industrial Assessment Centers  

Broader source: Energy.gov (indexed) [DOE]

UAIEE and IACs UAIEE and IACs Michael B Muller IAC Field Manager Rutgers University 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * Started in 1976 * Currently 26 Centers across the US * Almost 15,000 Assessments * Assessments in all 50 States * Over 111,000 Recommendations * Continues to Grow yearly by: * 400 assessments * 3,000 recommendations 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 IAC Assessments of Small and Medium Manufacturers 5月5-6日,2011|劳伦斯伯克利国家实验室,伯克利市,加州 Industrial Assessment Centers * ABET Accredited Engineering Universities * Director must be a teaching faculty member

220

Information needs for risk assessment  

SciTech Connect (OSTI)

Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

1990-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS  

E-Print Network [OSTI]

DOE)(2008b). IndustrialAssessmentCentersDatabase. ofEnergysIndustrialAssessmentCenter(IAC) database(

Masanet, Eric

2010-01-01T23:59:59.000Z

222

Western Water Assessment White Paper No. 9  

E-Print Network [OSTI]

University of Colorado Boulder, Colo. July 2011 Research supported by the Western Water Assessment #12;LISTWestern Water Assessment Western Water Assessment White Paper No. 9 ASSESSING MEASURES OF DROUGHT;Western Water Assessment White Paper No. 9 ASSESSING MEASURES OF DROUGHT IMPACT AND VULNERABILITY

Neff, Jason

223

Exploration Technologies Technology Needs Assessment  

Broader source: Energy.gov [DOE]

The Exploration Technologies Needs Assessment is a critical component of ongoing technology roadmapping efforts, and will be used to guide the program's research and development.

224

ORISE: Dose modeling and assessments  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

have participated include: Derivation of DCGLs for the Curtis Bay and Hammond depots Vermont Yankee Nuclear Power Station dose assessment study Radium timepiece dose modeling...

225

EA-1956: Final Environmental Assessment  

Broader source: Energy.gov [DOE]

Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

226

Reviewing electricity generation cost assessments.  

E-Print Network [OSTI]

?? Studies assessing the electricity generation cost of various power generating technologies are becoming increasingly common and references to such studies can often be heard (more)

Larsson, Simon

2012-01-01T23:59:59.000Z

227

Assessment Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Paducah Project Office - May 2012 Assessment of the PortsmouthPaducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May...

228

Assessment Documents | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Project Office - May 2012 Assessment of the PortsmouthPaducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants May 7, 2012...

229

Assessment Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 2010 Los Alamos Site Office Assessment of the Los Alamos National Laboratory TA-55 Fire Suppression System Upgrade to Safety Class October 1, 2010 Independent Oversight...

230

Management and Independent Assessments Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide reflects updated standards for assessment practices, international standards, and changes in DOE expectations related to quality assurance (QA). Cancels DOE G 414.1-1B.

2014-03-27T23:59:59.000Z

231

SEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF  

E-Print Network [OSTI]

and disinfect anyy microorganisms that may be present The majority of Recycled water produced in ArizonaSEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF BIOLOGICAL VARIABILITY Ch h M R k Ph D W t Q lit S i li tChannah M. Rock, Ph.D., Water Quality Specialist James Walworth, Ph

Fay, Noah

232

RCRA facility assessments  

SciTech Connect (OSTI)

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

233

Advanced Manufacturing Office: Industrial Assessment Centers (IACs)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Industrial Assessment Industrial Assessment Centers (IACs) to someone by E-mail Share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Facebook Tweet about Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Twitter Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Google Bookmark Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Delicious Rank Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on Digg Find More places to share Advanced Manufacturing Office: Industrial Assessment Centers (IACs) on AddThis.com... Industrial Assessment Centers (IACs) Learn More Learn how companies have benefited from IAC assessments. Search the IAC Database for recommendations and savings achieved.

234

WESTERN WATER ASSESSMENT WHITE PAPER  

E-Print Network [OSTI]

Science University of Colorado Boulder, Colo. 2013 Research supported by the Western Water Assessment #12 groups like the Western Governors' Association (WGA, 2011) and the State of Colorado (Klein et al., 2011WESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

Neff, Jason

235

ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS Juneau, AK 99802 (907) 586-7228 Abstract: This Environmental Assessment/Regulatory Impact Review For Amendment 89 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management

236

PRELIMINARY ASSESSMENT OF ENERGY ISSUES  

E-Print Network [OSTI]

PRELIMINARY ASSESSMENT OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Kevin OF ENERGY ISSUES ASSOCIATED WITH THE KLAMATH HYDROELECTRIC PROJECT Summary As requested by the California Hydroelectric Project (FERC No. 2082). Staff's assessment indicates that, from the perspective of potential

237

Risk Assessment Approaches for Nanomaterials  

E-Print Network [OSTI]

%) with extrapolation to lower "acceptable" risk 3. Analogy or comparative toxicity to other substances with similar7/3/2013 1 Risk Assessment Approaches for Nanomaterials Eileen D. Kuempel, PhD Nanotechnology to Nanomaterials Risk Assessment 1. No observed adverse effect level (NOAEL) or lowest (LOAEL) with uncertainty

Farritor, Shane

238

CALIFORNIA ALTERNATIVE FUELS MARKET ASSESSMENT  

E-Print Network [OSTI]

CALIFORNIA ALTERNATIVE FUELS MARKET ASSESSMENT 2006 Prepared For: California Energy Commission Yee #12;#12;v ABSTRACT Since 2001, the California Alternative Fuels Market Assessment (formerly's alternative fuels programs. It has been designed to provide a dynamic process for periodic reviews and updates

239

Performance Assessment Community of Practice  

Broader source: Energy.gov (indexed) [DOE]

L L l W t C t B d High-Level Waste Corporate Board Performance Assessment Community of Practice Community of Practice John E. Marra, Ph.D. Associate Laboratory Director Associate Laboratory Director 5 March 2009 DOE EM HLW Corporate Board Meeting Phoenix, Arizona DOE-EM HLW Corporate Board Meeting Performance Assessment Process Community of Practice Background EM Senior Management would like to have g improved consistency in the execution of the Performance Assessment* process; Originally formed a sub-committee to draft a guidance document for practitioners; Th b itt b li C it f The sub-committee now believes a Community of Practice having broader scope should replace it; Draft Charter in review and presented for Draft Charter in review and presented for discussion. * Performance Assessment (PA) is used broadly to encompass assessments for LLW

240

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Risk Assessment Documents Risk Assessment Documents ORNL RA Graphic Results ORNL Baseline Risk Assessment Results ORNL Screening Risk Assessment Results ORNL Other Risk Assessment Results ORNL RA Graphic Results WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Recreational Landuse (No Fish) Surface Water - Total Hazard Surface Water - Total Risk Surface Water - Strontium 90 Risk Surface Water - Tritium Risk Industrial Landuse

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Species for the screening assessment. Columbia River Comprehensive Impact Assessment  

SciTech Connect (OSTI)

Because of past nuclear production operations along the Columbia River, there is intense public and tribal interest in assessing any residual Hanford Site related contamination along the river from the Hanford Reach to the Pacific Ocean. The Columbia River Comprehensive Impact Assessment was proposed to address these concerns. The assessment of the Columbia River is being conducted in phases. The initial phase is a screening assessment of the risk, which addresses current environmental conditions for a range of potential uses. One component of the screening assessment estimates the risk from contaminants in the Columbia River to the environment. The objective of the ecological risk assessment is to determine whether contaminants from the Columbia River pose a significant threat to selected receptor species that exist in the river and riparian communities of the study area. This report (1) identifies the receptor species selected for the screening assessment of ecological risk and (2) describes the selection process. The species selection process consisted of two tiers. In Tier 1, a master species list was developed that included many plant and animal species known to occur in the aquatic and riparian systems of the Columbia River between Priest Rapids Dam and the Columbia River estuary. This master list was reduced to 368 species that occur in the study area (Priest Rapids Dam to McNary Dam). In Tier 2, the 181 Tier 1 species were qualitatively ranked based on a scoring of their potential exposure and sensitivity to contaminants using a conceptual exposure model for the study area.

Becker, J.M.; Brandt, C.A.; Dauble, D.D.; Maughan, A.D.; O`Neil, T.K.

1996-03-01T23:59:59.000Z

242

Environmental assessment of proposed effluent limitations guidelines and standards for synthetic-based drilling fluids and other-non aqueous drilling fluids in the oil and gas extraction point source category  

SciTech Connect (OSTI)

This environmental assessment consists of an evaluation of the ecological and indirect human health impacts for the discharge of cuttings contaminated with synthetic-based drilling fluids (SBFs) with respect to discharges to water. In addition, this document describes the environmental characteristics of SBF drilling wastes (e.g., toxicity, bioaccumulation, biodegradation), the types of anticipated impacts, and the pollutant modeling results for water column concentrations, pore water concentrations, and human health effects via consumption of affected seafood. The geographic areas considered under this rule are those where EPA knows SBFs are currently used and those where EPA projects SBFs will be used as a result of the SBF Effluent Guidelines. This includes the Gulf of Mexico, offshore California, and Cook Inlet, Alaska.

NONE

1999-02-01T23:59:59.000Z

243

CRAD, Self-Assessment Program Assessment Plan | Department of...  

Broader source: Energy.gov (indexed) [DOE]

DOE O 414.1A, Criterion 10 (a) An effective self-assessment program must have a clear document trail evidencing a culture of Lessons Learned. DOE O 414.1A, Criterion 10 (a)...

244

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

245

SunShot Initiative: Solar Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Resource Assessment to Solar Resource Assessment to someone by E-mail Share SunShot Initiative: Solar Resource Assessment on Facebook Tweet about SunShot Initiative: Solar Resource Assessment on Twitter Bookmark SunShot Initiative: Solar Resource Assessment on Google Bookmark SunShot Initiative: Solar Resource Assessment on Delicious Rank SunShot Initiative: Solar Resource Assessment on Digg Find More places to share SunShot Initiative: Solar Resource Assessment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards Balance of Systems

246

Utirik Atoll Dose Assessment  

SciTech Connect (OSTI)

On March 1, 1954, radioactive fallout from the nuclear test at Bikini Atoll code-named BRAVO was deposited on Utirik Atoll which lies about 187 km (300 miles) east of Bikini Atoll. The residents of Utirik were evacuated three days after the fallout started and returned to their atoll in May 1954. In this report we provide a final dose assessment for current conditions at the atoll based on extensive data generated from samples collected in 1993 and 1994. The estimated population average maximum annual effective dose using a diet including imported foods is 0.037 mSv y{sup -1} (3.7 mrem y{sup -1}). The 95% confidence limits are within a factor of three of their population average value. The population average integrated effective dose over 30-, 50-, and 70-y is 0.84 mSv (84, mrem), 1.2 mSv (120 mrem), and 1.4 mSv (140 mrem), respectively. The 95% confidence limits on the population-average value post 1998, i.e., the 30-, 50-, and 70-y integral doses, are within a factor of two of the mean value and are independent of time, t, for t > 5 y. Cesium-137 ({sup 137}Cs) is the radionuclide that contributes most of this dose, mostly through the terrestrial food chain and secondarily from external gamma exposure. The dose from weapons-related radionuclides is very low and of no consequence to the health of the population. The annual background doses in the U. S. and Europe are 3.0 mSv (300 mrem), and 2.4 mSv (240 mrem), respectively. The annual background dose in the Marshall Islands is estimated to be 1.4 mSv (140 mrem). The total estimated combined Marshall Islands background dose plus the weapons-related dose is about 1.5 mSv y{sup -1} (150 mrem y{sup -1}) which can be directly compared to the annual background effective dose of 3.0 mSv y{sup -1} (300 mrem y{sup -1}) for the U. S. and 2.4 mSv y{sup -1} (240 mrem y{sup -1}) for Europe. Moreover, the doses listed in this report are based only on the radiological decay of {sup 137}Cs (30.1 y half-life) and other radionuclides. However, we continually see {sup 137}Cs in the groundwater at all contaminated atolls; the turnover time of the groundwater is about 5 y. The {sup 137}Cs can only get to the groundwater by leaching through the soil column when a portion of the soluble fraction of {sup 137}Cs inventory in the soil is transported to the groundwater when rainfall is heavy enough to cause recharge of the aquifer. This process is causing a loss of {sup 137}Cs out of the root zone of the plants that provides an environmental loss constant ({lambda}{sub env}) in addition to radiological decay {lambda}{sub rad}. Consequently, there is an effective rate of loss, {lambda}{sub eff} = {lambda}{sub rad} + {lambda}{sub env} that is the sum of the radiological and environmental-loss decay constants. We have had, and continue to have, a vigorous program to determine the rate of the environmental loss process. What we do know at this time is that the loss of {sup 137}Cs over time is greater than the estimate based on radiological decay only, and that the actual dose received by the Utirik people over 30-, 50-, or 70-y will be less than those presented in this report.

Robison, W.L.; Conrado, C.L.; Bogen, K.T

1999-10-06T23:59:59.000Z

247

First National Climate Assessment: Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview Print E-mail Overview Print E-mail Below you will find answers to the most frequently asked questions about the First National Climate Assessment Report. alt Goal and Architecture Organization and Mandate Regions Sectors Synthesis Report Scenarios Relationship to Other Activities Goal and Architecture What was the goal of the First National Assessment? The overall goal of the National Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the public, the environment, and the nation's resources. Special efforts were made to involve the end users - such as water resource managers, farmers, and decisionmakers - in all stages of the Assessment so that the final outcome was useful to the widest audience possible and was truly developed through a participatory process.

248

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Risk Assessment Documents Risk Assessment Documents Y-12 RA Graphic Results Y-12 Baseline Risk Assessment Results Y-12 Screening Risk Assessment Results Bullet Graphic Risk Results Arrow Bear Creek Valley Maps Residential Landuse Groundwater - Total Hazard (range: 1 - 900) Groundwater - Total Hazard (range: 0.1 - 1) Groundwater - Total Risk (range: 10-4 - 1) Groundwater - Total Risk (range: 10-5 - 10-4) Groundwater - Total Risk (range: 10-6 - 10-5) Groundwater - Dichloroethane, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Hazard Groundwater - Dichloroethene, 1,1- Risk Groundwater - Dichloroethane, 1,2- Risk Groundwater - Dichloroethene, 1,2- Hazard Groundwater - Nitrate Hazard Groundwater - Radium Risk Groundwater - Technetium-99 Risk Groundwater - Tetrachloroethene Hazard Groundwater - Tetrachloroethene Risk

249

NREL: Energy Analysis: Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resource Assessment Resource Assessment NREL has developed maps and tools to conduct renewable energy resource assessments at the state, national and international level. Around the world, interest is growing in renewable energy as a strategy to mitigate greenhouse gas emissions and increase energy security. The starting point for new renewable energy projects is a characterization of the renewable resources available across a region, a resource assessment. NREL uses geospatial data sets to identify regions that are appropriate for renewable development and those that should be excluded such as water bodies, urban areas, cropland, forests, very steep terrain, and protected areas. Once resource data are available for a region, NREL can estimate the theoretical potential, or upper limit, for renewable energy in an area.

250

Colorado Statewide Forest Resource Assessment  

E-Print Network [OSTI]

Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Implementation of Forest Management in Colorado #12;Acknowledgements The Colorado State Forest Service (CSFS, for providing leadership and oversight throughout the development of Colorado's Statewide Forest Resource

251

Environmental Impact Assessment in Canadian  

E-Print Network [OSTI]

energy projects/pipelines) Canadian Nuclear Safety Commission (for uranium mining, nuclear facilities26/02/2014 1 Environmental Impact Assessment in Canadian Mine/Energy Development The Purpose

Boisvert, Jeff

252

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

253

Cogeneration Assessment Methodology for Utilities  

E-Print Network [OSTI]

A methodology is presented that enables electric utilities to assess the cogeneration potential among industrial, commercial, and institutional customers within the utility's service area. The methodology includes a survey design, analytic...

Sedlik, B.

1983-01-01T23:59:59.000Z

254

Fan System Assessment Tool Introduction  

Broader source: Energy.gov [DOE]

This presentation provides an introduction to the Fan System Assessment Tool (FSAT). With FSAT, users can calculate the amount of energy used by their fan system; determine system efficiency; and quantify the savings potential of an upgraded system.

255

Utility View of Risk Assessment  

E-Print Network [OSTI]

This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

Bickham, J.

256

Risk assessment and the law  

Science Journals Connector (OSTI)

Risk assessment and the law ... I am not at all sure that federal judges, immune from the political process, should ever be involved, under any circumstances, as arbiters of the degree of risk acceptable to the public. ...

1980-11-24T23:59:59.000Z

257

Environmental Design Space model assessment  

E-Print Network [OSTI]

The Environmental Design Space (EDS) is a multi-disciplinary design tool used to explore trade-offs among aircraft fuel burn, emissions, and noise. This thesis uses multiple metrics to assess an EDS model of a Boeing 777 ...

Spindler, Phillip Michael

2007-01-01T23:59:59.000Z

258

Transboundary aquifers: Southwestern states assess  

E-Print Network [OSTI]

tx H2O | pg. 14 Southwestern states assess Researchers from three universities in Texas, New Mexico, and Arizona and from the U.S. Geological Survey (USGS) are partnering on a new project to evaluate aquifers that span the United States... and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States...

Wythe, Kathy

2008-01-01T23:59:59.000Z

259

EA-1488: Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

728D 728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION ........................................................................................................................... 1 3

260

EA-1853: Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT DOE/EA-1853 PERRIN RANCH WIND ENERGY INTERCONNECTION PROJECT COCONINO COUNTY, ARIZONA Prepared for U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457 Phoenix, Arizona 85005 Prepared by SWCA Environmental Consultants 3033 North Central Avenue, Suite 145 Phoenix, Arizona 85012 (602) 274-3831 www.swca.com July 2011 July 2011 i CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 1 1. INTRODUCTION ................................................................................................................................ 1 1.1 BACKGROUND .......................................................................................................................... 1

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

The Western Water Assessment Annual RISA Report  

E-Print Network [OSTI]

The Western Water Assessment Annual RISA Report Reporting Period: January-December 2006 #12;Western................................................20 #12;Western Water Assessment 2006 Annual Report 3 _____________________________________________________ WWA Mission: The mission of the Western Water Assessment is to identify and characterize regional

Neff, Jason

262

The Western Water Assessment Annual RISA Report  

E-Print Network [OSTI]

The Western Water Assessment Annual RISA Report Reporting Period: January 2007-December 2007 #12;Western Water Assessment 2007 Annual Report 2 Table of Contents I. Areas of Focus-30 #12;Western Water Assessment 2007 Annual Report 3

Neff, Jason

263

printed on recycled paper INDUSTRIAL ASSESSMENT CENTER  

E-Print Network [OSTI]

printed on recycled paper INDUSTRIAL ASSESSMENT CENTER ENERGY EFFICIENCY, POLLUTION PREVENTION ASSESSMENT REPORT FOR ENERGY EFFICIENCY, POLLUTION PREVENTION, AND PRODUCTIVITY IMPROVEMENT No. CO0999 ASSESSMENT DATE: February 29, 2000 LOCATION: ______, Colorado PRINCIPAL PRODUCTS: Injection molded plastic

264

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

SciTech Connect (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

265

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30, 1993 30, 1993 EA-0921: Final Environmental Assessment Ambulatory Research and Education Center, Oregon Health Sciences University July 1, 1993 EA-0847: Final Environmental Assessment Live Fire Range at the Central Training Academy, Albuquerque, New Mexico June 25, 1993 EA-0841: Final Environmental Assessment Import of Russian Plutonium-238 June 3, 1993 EA-0923: Final Environmental Assessment Winnett School District Boiler Replacement Project June 1, 1993 EA-0792: Final Environmental Assessment Nonnuclear Consolidation Environmental Assessment April 2, 1993 EA-0822: Final Environmental Assessment Idaho National Engineering Laboratory Consolidated Transportation Facility January 29, 1993 EA-0688: Final Environmental Assessment Hazardous Waste Staging Facility, Pantex Plant, Amarillo, Texas

266

Independent Oversight Assessment, Pantex Plant - November 2012...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oversight Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant This report provides the results of an independent...

267

EA-1859: Floodplain Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

59: Floodplain Assessment EA-1859: Floodplain Assessment Kirkwood Community College Wind Energy Facility Kirkwood Community College in Cedar Rapids, Iowa is proposing the...

268

Marine and Hydrokinetic Resource Assessment and Characterization...  

Energy Savers [EERE]

Characterization Marine and Hydrokinetic Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the resource potential of the...

269

Colorado State University Industrial Assessment Center Saves...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

audit. | Photo courtesy of University of Missouri IAC. Industrial Assessment Centers Train Future Energy-Savvy Engineers Industrial Assessment Centers Help Students, Communities...

270

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes January 17, 2008 Present: Diane Armpriest bag session (thresholds for data). The agenda item for the next ad hoc assessment committee

O'Laughlin, Jay

271

Ecosystem Vulnerability Assessment - Patterns of Climate Change...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the Southwest Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the...

272

Assessment of Evaluation, Measurement, and Verification Methods...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment of Evaluation, Measurement, and Verification Methods - 2014 BTO Peer Review Assessment of Evaluation, Measurement, and Verification Methods - 2014 BTO Peer Review...

273

National Geothermal Resource Assessment and Classification |...  

Broader source: Energy.gov (indexed) [DOE]

Resource Assessment and Classification National Geothermal Resource Assessment and Classification This work will enable lower riskcost deployment of conventional and EGS...

274

Risk Assessment & Management Information | Department of Energy  

Office of Environmental Management (EM)

Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE...

275

NREL: International Activities - Biomass Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biomass Resource Assessment Map showing annual productivity of marginal lands in APEC economies. Biomass resource assessments quantify the existing or potential biomass material in...

276

Assessing Energy Resources Webinar Text Version | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Text Version Assessing Energy Resources Webinar Text Version Download the text version of the audio from the DOE Office of Indian Energy webinar on assessing energy resources. DOE...

277

Tribal Renewable Energy Foundational Course: Assessing Energy...  

Broader source: Energy.gov (indexed) [DOE]

Assessing Energy Needs and Resources Tribal Renewable Energy Foundational Course: Assessing Energy Needs and Resources Watch the U.S. Department of Energy Office of Indian Energy...

278

Risk Assessment Technical Experts Working Group  

Broader source: Energy.gov [DOE]

The Risk Assessment Technical Experts Working Group (RWG) was established to assist DOE in the appropriate and effective use of quantitative risk assessment in nuclear safety related activities.

279

Sandia National Laboratories: Assessing the Economic Potential...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EnergyBiofuelsAssessing the Economic Potential of Advanced Biofuels Assessing the Economic Potential of Advanced Biofuels Fabrication of AMI Demonstration Blade Begun...

280

Advanced Technology Vehicle Benchmark and Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Benchmark and Assessment Advanced Technology Vehicle Benchmark and Assessment 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting,...

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CRAD, Communications Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Plan CRAD, Communications Assessment Plan Performance Objective: Lines of authority are clearly defined with clear and open communications existing between...

282

PHEV Battery Cost Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PHEV Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting...

283

PHEV Battery Cost Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PHEV Battery Cost Assessment PHEV Battery Cost Assessment 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

284

Crucial Habitat Assessment Tool | Open Energy Information  

Open Energy Info (EERE)

Assessment Tool Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Crucial Habitat Assessment Tool Author Western Governors' Association Published...

285

Independent Oversight Assessment, Waste Treatment and Immobilization...  

Office of Environmental Management (EM)

Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the...

286

Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment  

SciTech Connect (OSTI)

To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

NONE

1997-04-01T23:59:59.000Z

287

System Assessment Standards: Defining the Market for Industrial Energy Assessments  

SciTech Connect (OSTI)

Improved efficiency of industrial systems (e.g., compressed air or steam) contributes to a manufacturing facility?s bottom line, improves reliability, and better utilizes assets. Despite these advantages, many industrial facilities continue to have unrealized system optimization potential. A barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services, creating problems for both service providers in establishing market value for their services and for consumers in determining the relative quality of these system assessment services. On August 19, 2008, the American Society of Mechanical Engineers (ASME) issued four new draft Standards for trial use that are designed to raise the bar and define the market for these services. These draft Standards set the requirements for conducting an energy assessment at an industrial facility for four different system types: compressed air, process heating, pumping, and steam. The Standards address topics such as organizing and conducting assessments; analyzing the data collected; and reporting and documentation. This paper addresses both the issues and challenges in developing the Standards and the accompanying Guidance Documents, as well as the result of field testing by industrial facilities, consultants, and utilities during the trial use period that ended in January, 2009. These Standards will be revised and released by ASME for public review, and subsequently submitted for approval as American National Standards for publication in late 2009. Plans for a related activity to establish a professional-level program to certify practitioners in the area of system assessments, opportunities to integrate the ASME Standards with related work on industrial energy efficiency, as well as plans to expand the system assessment Standard portfolio are also discussed.

Sheaffer, Paul; McKane, Aimee; Tutterow, Vestal; Crane, Ryan

2009-08-01T23:59:59.000Z

288

Qualitative methods for assessing risk  

SciTech Connect (OSTI)

The Department of Energy`s (DOE) non-nuclear facilities generally require only a qualitative accident analysis to assess facility risks in accordance with DOE Order 5481.1B, Safety Analysis and Review System. Achieving a meaningful qualitative assessment of risk necessarily requires the use of suitable non-numerical assessment criteria. Typically, the methods and criteria for assigning facility-specific accident scenarios to the qualitative severity and likelihood classification system in the DOE order requires significant judgment in many applications. Systematic methods for more consistently assigning the total accident scenario frequency and associated consequences are required to substantiate and enhance future risk ranking between various activities at Sandia National Laboratories (SNL). SNL`s Risk Management and National Environmental Policy Act (NEPA) Department has developed an improved methodology for performing qualitative risk assessments in accordance wi the DOE order requirements. Products of this effort are an improved set of qualitative description that permit (1) definition of the severity for both technical and programmatic consequences that may result from a variety of accident scenarios, and (2) qualitative representation of the likelihood of occurrence. These sets of descriptions are intended to facilitate proper application of DOE criteria for assessing facility risks.

Mahn, J.A. [Sandia National Labs., Albuquerque, NM (United States); Hannaman, G.W. [Science Applications International Corp., San Diego, CA (United States); Kryska, P. [Science Applications International Corp., Albuquerque, NM (United States)

1995-04-01T23:59:59.000Z

289

Assessment endpoints: Defining the question  

SciTech Connect (OSTI)

The EPA Framework for Ecological Risk Assessments incorporated two significant improvements in the ecological risk assessment (EcoRA) process. First, the guidance emphasized the importance of defining the problems to be addressed (The Problem Formulation Phase). Secondly, the guidance explicitly calls for dialogue between risk managers and risk assessors. Implementing these elements has proven difficult and sometimes contentious. Risk assessors know how to do many things very well-including literature reviews, toxicity screens, deterministic exposure models, calculations of exposure:effects quotients, etc. However, these efforts often fall short of what risk managers need to make decisions. Moreover, there is a high likelihood that such risk assessment information fails to address the concerns of stakeholders. It is the authors` position that the risk assessors by themselves will seldom be able to produce meaningful assessments because they will usually fail to anticipate the needs of risk managers and the expectations of stakeholders. To become a meaningful part of the social decision process, the EcoRA process (especially the critical Problem Formulation Phase) must be opened to a larger group of participants that includes assessors, managers, and stakeholder representatives. Formal methods in conflict resolution and consensus building among diverse interest groups are available. The authors will describe the need to develop guidelines for the application of these tools to reach agreement on assessment endpoints, Early agreement on the focus of work improves the chances for effective communication of risk and understanding of the basis for environmental management decisions.

Fairbrother, A.; Kapustka, L.A.; Williams, B.A.; Bennett, R.S. [Ecological Planning and Toxicology, Inc., Corvallis, OR (United States)

1995-12-31T23:59:59.000Z

290

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT | Department of...  

Broader source: Energy.gov (indexed) [DOE]

ASSESSMENT ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT More Documents & Publications Assessment B - Program Criteria Assessment C-Site Visit Protocol Records Management Handbook...

291

Office of Worker Safety and Health Assessments | Department of...  

Office of Environmental Management (EM)

Worker Safety and Health Assessments Office of Worker Safety and Health Assessments MISSION The Office of Worker Safety and Health Assessments conducts assessments to provide...

292

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Graphic Results Graphic Results Baseline Risk Assessment Results Screening Risk Assessment Results Other Risk Assessment Results Graphic Results K-25 Groundwater Residential Landuse Bedrock Wells - Total Hazard (range: 1-30) Bedrock Wells - Total Hazard (range: 0.1 - 1) Bedrock Wells - Total Risk Bedrock Wells - Arsenic Risk Bedrock Wells - Dichloroethene, 1,1- Risk Bedrock Wells - Trichloroethene Risk Unconsolidated Wells - Total Hazard (range: 1-150) Unconsolidated Wells - Total Hazard (range: 0.1 - 1) Unconsolidated Wells - Total Risk (range:10-4 - 1) Unconsolidated Wells - Total Risk (range:10-6 - 10-4) Unconsolidated Wells - Arsenic Risk Unconsolidated Wells - Trichloroethene Risk ORNL WAG 2 Residential Landuse Sediment - Total Risk Sediment - Cesium 137 Risk Sediment - Cobalt 60 Risk

293

Guidelines for Ecological Risk Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5/002F 5/002F April 1998 Guidelines for Ecological Risk Assessment (Published on May 14, 1998, Federal Register 63(93):26846-26924) Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. NOTICE This report contains the full text of the Guidelines for Ecological Risk Assessment. However, the format of this version differs from the Federal Register version, as follows: text boxes that are included in this document at their point of reference were instead listed at the end of the Federal Register document as text notes, due to format limitations for Federal Register documents.

294

Impact Assessments | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact Assessments Impact Assessments Impact Assessments PIA Template with Guidance (MS Word) Management and Administration (MA) Open Gov User Voice System (3WP) (pdf) DOE Open Government Plan Comment Box (pdf) Energy Contractor Registration System (EnCoRe) (pdf) Hiring Management Enterprise Solutions (HMES) (pdf) Foreign Travel Management System (FTMS) (pdf) FOIAXpress (pdf) Electronic Document Online Correspondence and Concurrence (eDOCS) (pdf) DOE Jobs Online (Hiring Management) (pdf) FORM EIA 457-A/G Residential Energy Consumption Survey (pdf) Office of Hearings and Appeals (OHA) Tracking System (pdf) Corporate Human Resources Information System (CHRIS) (pdf) Energy Inspector General Project Tracking System (EIGPT) (pdf) Electronic DOE Information Security System (eDISS) (pdf)

295

The assess facility descriptor module  

SciTech Connect (OSTI)

The Facility Descriptor (Facility) module is part of the Analytic System and Software for Evaluating Safeguards and Security (ASSESS). Facility is the foundational software application in the ASSESS system for modelling a nuclear facility's safeguards and security system to determine the effectiveness against theft of special nuclear material. The Facility module provides the tools for an analyst to define a complete description of a facility's physical protection system which can then be used by other ASSESS software modules to determine vulnerability to a spectrum of insider and outsider threats. The analyst can enter a comprehensive description of the protection system layout including all secured areas, target locations, and detailed safeguards specifications. An extensive safeguard component catalog provides the reference data for calculating delay and detection performance. Multiple target locations within the same physical area may be specified, and the facility may be defined for two different operational states such as dayshift and nightshift. 6 refs., 5 figs.

Jordan, S.E.; Winblad, A.; Key, B.; Walker, S.; Renis, T.; Saleh, R.

1989-01-01T23:59:59.000Z

296

Ion exchange technology assessment report  

SciTech Connect (OSTI)

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW's. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-01-01T23:59:59.000Z

297

Ion exchange technology assessment report  

SciTech Connect (OSTI)

In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

Duhn, E.F.

1992-12-31T23:59:59.000Z

298

SRS Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

299

resource assessment | OpenEI  

Open Energy Info (EERE)

resource assessment resource assessment Dataset Summary Description Reduction of global greenhouse gas emission to arrest global warming requires minimizing the use of fossil fuels. To achieve this a large scale use of renewable energies must be made over the globe for production of electrical and thermal energy. Success of wind and solar energy projects require detailed and precise information on the resources. For most developing countries adequate information on the resources are not available. Source Renewable Energy Research Centre, University of Dhaka Date Released February 19th, 2007 (7 years ago) Date Updated Unknown Keywords Feasibility Study resource assessment Solar Energy SWERA Bangladesh Wind Energy Data application/pdf icon swera_bangladesh_fullreport.pdf (pdf, 2.7 MiB)

300

Hoisting & Rigging Assessment Plan  

Broader source: Energy.gov (indexed) [DOE]

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Advanced Network Toolkit for Assessments  

Broader source: Energy.gov (indexed) [DOE]

Network Toolkit for Assessments Network Toolkit for Assessments and Remote Mapping (ANTFARM) Uses existing information to passively map control systems networks and identify cyber security perimeters Control systems operators require a map of their energy control system network in order to identify its electronic security perimeter, critical to meeting the North American Electric Reliability Corporation's (NERC) Critical Infrastructure Protection (CIP) standards. However, purchasing active, online scanning tools specifically for network mapping can be costly, and these tools can disrupt control system function, causing system latency and possibly affecting power supply. The ANTFARM software tool enables system operators to remotely and

302

Spent Fuel Transportation Risk Assessment  

Broader source: Energy.gov (indexed) [DOE]

Fuel Transportation Risk Assessment Fuel Transportation Risk Assessment (SFTRA) Draft NUREG-2125 Overview for National Transportation Stakeholders Forum John Cook Division of Spent Fuel Storage and Transportation 1 SFTRA Overview Contents * Project and review teams * Purpose and goals * Basic methodology * Improvements relative to previous studies * Draft NUREG structure and format * Routine shipment analysis and results * Accident condition analysis and results * Findings and conclusions * Schedule 2 SFTRA Research and Review Teams * Sandia National Laboratory Research Team [$1.8M; 9/06-9/12] - Doug Ammerman - principal investigator - Carlos Lopez - thermal - Ruth Weiner - RADTRAN * NRC's SFTRA Technical Review Team - Gordon Bjorkman - structural

303

Hoisting & Rigging Assessment Plan  

Broader source: Energy.gov (indexed) [DOE]

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

304

Guide for ecological risk assessment  

SciTech Connect (OSTI)

Ecological risk assessment evaluates the likelihood that adverse ecological effects may occur or are occurring as a result of exposure to one or more stressors. Ecological risk assessment provides a critical element for environmental decision making by giving risk managers an approach for considering available scientific information along with the other factors they need to consider (e.g., social, legal, political, or economic) in selecting a course of action. The primary audience for this document is risk assessors and risk managers at EPA, although these Guidelines also may be useful to others outside the Agency.

NONE

1998-04-01T23:59:59.000Z

305

Adaptive capacity and its assessment  

SciTech Connect (OSTI)

This paper reviews the concept of adaptive capacity and various approaches to assessing it, particularly with respect to climate variability and change. I find that adaptive capacity is a relatively under-researched topic within the sustainability science and global change communities, particularly since it is uniquely positioned to improve linkages between vulnerability and resilience research. I identify opportunities for advancing the measurement and characterization of adaptive capacity by combining insights from both vulnerability and resilience frameworks, and I suggest several assessment approaches for possible future development that draw from both frameworks and focus on analyzing the governance, institutions, and management that have helped foster adaptive capacity in light of recent climatic events.

Engle, Nathan L.

2011-04-20T23:59:59.000Z

306

Integrated Environmental Assessment Part III: ExposureAssessment  

SciTech Connect (OSTI)

Human exposure assessment is a key step in estimating the environmental and public health burdens that result chemical emissions in the life cycle of an industrial product or service. This column presents the third in a series of overviews of the state of the art in integrated environmental assessment - earlier columns described emissions estimation (Frey and Small, 2003) and fate and transport modeling (Ramaswami, et al., 2004). When combined, these first two assessment elements provide estimates of ambient concentrations in the environment. Here we discuss how both models and measurements are used to translate ambient concentrations into metrics of human and ecological exposure, the necessary precursors to impact assessment. Exposure assessment is the process of measuring and/or modeling the magnitude, frequency and duration of contact between a potentially harmful agent and a target population, including the size and characteristics of that population (IPCS, 2001; Zartarian, et al., 2005). Ideally the exposure assessment process should characterize the sources, routes, pathways, and uncertainties in the assessment. Route of exposure refers to the way that an agent enters the receptor during an exposure event. Humans contact pollutants through three routes--inhalation, ingestion, and dermal uptake. Inhalation occurs in both outdoor environments and indoor environments where most people spend the majority of their time. Ingestion includes both water and food, as well as soil and dust uptake due to hand-to-mouth activity. Dermal uptake occurs through contacts with consumer products; indoor and outdoor surfaces; the water supply during washing or bathing; ambient surface waters during swimming or boating; soil during activities such as work, gardening, and play; and, to a lesser extent, from the air that surrounds us. An exposure pathway is the course that a pollutant takes from an ambient environmental medium (air, soil, water, biota, etc), to an exposure medium (indoor air, food, tap water, etc.) and to an exposed individual. Exposure scenarios are used to define plausible pathways for human contact. Recognition of the multiple pathways possible for exposure highlights the importance of a multimedia, multipathway exposure framework.

McKone, Thomas E.; Small, Mitchell J.

2006-06-01T23:59:59.000Z

307

Children's School February 2013 Director's Corner: Assessment  

E-Print Network [OSTI]

or on an outpatient basis elsewhere. · To gather our assessment data, we utilize a variety of natural classroomChildren's School February 2013 Director's Corner: Assessment The NAEYC standard for Assessment that we utilize a particular type of assessment or standardized test, so we are free to design a system

308

Draft Innovative Exploration Technologies Needs Assessment  

Broader source: Energy.gov [DOE]

A draft needs assessment for the Geothermal Technologies Programs Innovative Exploration Technologies Subprogram.

309

European Climate Assessment & Dataset Report 2008  

E-Print Network [OSTI]

for the EUMETNET-ECSN projects "European Climate Assessment" (ECA, starting 1998) and "European Climate Dataset: ECA&D; the "Eu- ropean Climate Assessment and Data set" This ECA&D project was proposedEuropean Climate Assessment & Dataset Report 2008 ECA&D · · · · European Climate Assessment

Stoffelen, Ad

310

California Valley Solar Ranch Biological Assessment  

Broader source: Energy.gov [DOE]

Biological Assessment for the California Valley Solar Ranch Project San Luis Obispo County, California

311

CX-006029: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6029: Categorical Exclusion Determination 6029: Categorical Exclusion Determination CX-006029: Categorical Exclusion Determination Acoustic Effects of Hydrokinetic Tidal Turbines CX(s) Applied: B3.3, B3.6 Date: 05/25/2011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Snohomish County Public Utility District (PUD) is proposing to use Department of Energy and cost-share funding to study of the acoustic effects of hydrokinetic tidal turbines at the site of the District's Admiralty Inlet pilot project. Activities would include the purchase and configuration of instrumentation, the deployment and retrieval of the instrumentation packages on the seabed, the simulation and measurement of sound propagation by a tidal turbine, and experimentation (conducted at

312

CX-002145: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

145: Categorical Exclusion Determination 145: Categorical Exclusion Determination CX-002145: Categorical Exclusion Determination Acoustic Effects of Hydrokinetic Tidal Turbines CX(s) Applied: B3.1, B3.3, A9 Date: 04/29/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Snohomish County Public Utility District (PUD) is proposing to use Department of Energy and cost-share funding to study of the acoustic effects of hydrokinetic tidal turbines at the site of the District's Admiralty Inlet pilot project. Activities would include the purchase and configuration of instrumentation, the deployment and retrieval of the instrumentation packages on the seabed, the simulation and measurement of sound propagation by a tidal turbine, and experimentation (conducted at

313

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 2360 of 29,416 results. 51 - 2360 of 29,416 results. Download EA-1949: FERC Notice of Availability Errata Sheet Admiralty Inlet Pilot Tidal Project, Puget Sound, WA http://energy.gov/nepa/downloads/ea-1949-ferc-notice-availability-errata-sheet Download Pressure Data Within BOP- ODS This file describes the components within the BOP and the pressure readings taken during diagnostic operations on May 25. http://energy.gov/downloads/pressure-data-within-bop-ods Download Pressure Data Within BOP- XLS This file describes the components within the BOP and the pressure readings taken during diagnostic operations on May 25. http://energy.gov/downloads/pressure-data-within-bop-xls Download EIS-0373: Notice of Intent to Prepare an Environmental Impact Statement Proposed Consolidation of Nuclear Operations Related to Production of

314

CONSULTANT REPORT ASSESSMENT OF PUBLICLY  

E-Print Network [OSTI]

ENERGY EFFICIENCY POTENTIALS AND TARGETS SEPTEMBER 2011 CEC2002011007-AT Prepared for: California this information to the California Energy Commission for evaluation. This report assesses the energy efficiency potential and efficiency savings targets adopted for 2011­2020 by the publicly owned utilities. This report

315

CRAD, Configuration Management Assessment Plan  

Broader source: Energy.gov [DOE]

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

316

ENVIRONMENTAL ASSESSMENT REGULATORY IMPACT REVIEW  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT AND REGULATORY IMPACT REVIEW FOR FISHERY PLAN AMENDMENTS TO PROHIBIT USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 3.0 REGULATORY IMPACT REVIEW: SOCIAL AND ECONOMIC IMPACTS OF THE ALTERNATIVES / Aleutian Islands Plan Amendment 33 and Gulf of Alaska Plan Amendment 37 Prepared by Staff of the North

317

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

318

Environmental Risk Assessment of Paroxetine  

Science Journals Connector (OSTI)

ERAs can be categorized according to the problems addressed:? Predictive risk assessments estimate risks from proposed future actions such as marketing a new medicine, operating a new process, or emitting a new aqueous or atmospheric contaminant. ... If SF acceptable risk to the environment. ...

Virginia L. Cunningham; David J. C. Constable; Robert E. Hannah

2004-05-14T23:59:59.000Z

319

Hazards Survey and Hazards Assessments  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

1997-08-21T23:59:59.000Z

320

NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool  

E-Print Network [OSTI]

NAQSAT National Air Quality Site Assessment Tool NAQSAT National Air Quality Site Assessment Tool Air Quality Assessment Tool For Livestock Producers & Advisors #12;NAQSAT The National Air Quality Dairymen National Air Quality Site Assessment Tool Benefits for Producers · Voluntarily and securely assess

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Technology Assessment: a concept for Europe?  

Science Journals Connector (OSTI)

European technology assessment has been gaining ground continuously since the 1970s. However, the European technology assessment scene remains diverse and fragmented. This paper attempts to show some aspects of the variety of ideas, approaches and functions that characterize the European technology assessment scene, namely those that can be traced to national technology assessment systems. It is argued that technology assessment systems incorporate the links between science, technology and policy, as well as an intermediation by technology assessment researchers and practitioners. Differences between national technology assessment systems in 6 European countries (France, Germany, the UK, The Netherlands, Belgium and Denmark), are demonstrated through a survey of technology assessment expertise. Drawing on the pictures of the 6 national systems, the paper comments on European technology assessment and the issues with which it is faced.

N. Kastrinos

1996-01-01T23:59:59.000Z

322

Life assessments of a boiler economizer unit  

SciTech Connect (OSTI)

An economizer which experienced pitting corrosion during a cleaning accident was subject to recurring corrosion fatigue failures. A condition assessment was undertaken to assess the risk of further failures through metallurgical assessment, extreme value pitting assessments, and on-site NDT condition assessment with on-site extreme value pitting analysis. This was followed by a fatigue life assessment in accordance with PD6493. Condition assessment work and lifetime prediction progressed from initial failure investigation through to final recommendations in a stepwise process. Each stage of the work was followed by a review of the findings and an economic assessment of the alternative options i.e. continue with assessment, full economizer replacement or partial replacement. Selective replacement of a portion of the economizer was recommended.

Lichti, K.A.; Thomas, C.W.; Wilson, P.T. [Industrial Research Ltd., Lower Hutt (New Zealand); Julian, W. [Contact Energy Ltd., New Plymouth (New Zealand). New Plymouth Power Station

1997-09-01T23:59:59.000Z

323

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 1, 2011 February 1, 2011 EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan February 1, 2011 EA-1700: Final Environmental Assessment Computational Research and Theory Facility Project February 1, 2011 EA-1816: Final Environmental Assessment Town of Hempstead Wind-to-Hydrogen Project, Point Lookout, New February 1, 2011 EA-1815: Final Environmental Assessment Cuyahoga County Agricultural Society Wind Energy Project, Berea, Cuyahoga County, Ohio February 1, 2011 EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio February 1, 2011 EA-1818: Final Environmental Assessment Pettisville Local Schools Wind Energy Project, Pettisville, Fulton County,

324

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 4, 2009 September 4, 2009 EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development September 1, 2009 EA-1584: Final Environmental Assessment Sand Point Wind Installation Project Sand Point, Alaska September 1, 2009 EA-1788: Final Environmental Assessment Sapphire Energy, Inc.'s Integrated Algal Biorefinery (IABR) Facility in Columbus, New Mexico August 3, 2009 EA-1674: Final Environmental Assessment 10 CFR 431 Energy Conservation Program: Energy Conservation Standards for Refrigerated Bottled or Canned Beverage Vending Machines August 3, 2009 EA-1659: Final Environmental Assessment Proposed Demolition of Building 330 at Argonne National Laboratory August 3, 2009 EA-1652: Final Environmental Assessment

325

Vulnerability Assessment Team (VAT) - Nuclear Engineering Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Vulnerability Assessment Team Vulnerability Assessment Team VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms

326

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 1, 2009 January 1, 2009 EA-1611: Final Environmental Assessment Interconnection Request for the Colorado Highlands Wind Project January 1, 2009 EA 1647: Supplemental Environmental Assessment Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (formerly Range Fuels Inc.) Treutlen County, Georgia December 1, 2008 EA-1643: Final Environmental Assessment 10 CFR 431 Commercial Refrigeration Equipment December 1, 2008 EA-1633: Final Environmental Assessment Green Mountain Reservoir Substitution and Power Interference Agreements December 1, 2008 EA-1624: Final Environmental Assessment Auburn Landfill Gas Electric Generators and Anaerobic Digester Energy Facilities November 3, 2008 EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection

327

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 16, 2011 August 16, 2011 EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah August 15, 2011 EA-1888: Draft Environmental Assessment Old Town Fuel and Fiber Proposed Demonstration-Scale Integrated Biorefinery August 13, 2011 EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin August 12, 2011 EA-1723: Draft Supplemental Environmental Assessment General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative August 3, 2011 EA-1840: Final Environmental Assessment California Valley Solar Ranch Project in San Luis Obispo and Kern Counties, California August 1, 2011 EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI

328

Hanford Production Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Needs Assessment for Medical Surveillance of Needs Assessment for Medical Surveillance of Former Hanford Workers Phase I - October 1, 1997 Report Submitted by: University of Washington Occupational and Environmental Medicine Program 325 Ninth Avenue, Box 359739 Seattle, WA 98104 October 1, 1997 Authors Scott Barnhart, MD, MPH Principal Investigator Tim Takaro, MD, MPH, MS Co-Principal Investigator Bert Stover, BA Kate Durand, MHS, CIH Bill Trejo, BS Chris Mack, MS Kathy Ertell, MS, CIH Cooperative Agreement # DE-FCO3-96SF21-2581A000 TABLE OF CONTENTS List of Tables iv List of Figures v Executive Summary vi Introduction 1 II. Methods A. Human Subjects 3 B. Population Identification - Available Databases 3 C. Pending Databases 4 D. Assembly of Master Database 5 E. Estimation of Mortality 6 F. Estimation of Exposure* 6 C. Estimate of Need of Medical Surveillance

329

SITEWIDE ENVIRONMENTAL ASSESSMENT EA-1008  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT EA-1008 for CONTINUED DEVELOPMENT OF NAVAL PETROLEUM RESERVE NO. 3 WR-3) Natrona County, Wyoming Prepared For U.S. Department of Energy Casper, Wyoming July 1995 OISTRIBUTION OF THIS DOCUMENT is UNLIMITED& i Portions of this document be illegible in electronic image products. Images are produced from the best available original dOCUIIlent, c AGENCY: ACTION: DEPARTMENT OF ENERGY Continued Development - Naval Petroleum Reserve No. 3 Naval Petroleum and Oil Shale Reserves U.S. Department of Energy (DOE) Finding of No Significant Impact (FONSI) for the Continued Development of Naval Petroleum Reserve No. 3 (DOE/EA-1008) SUMMARY: The Secretary of Energy is required by law to "explore, prospect, conserve, develop, use, and operate" the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum

330

Assessment of Project Management Experience  

Broader source: Energy.gov (indexed) [DOE]

Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Assessment of Project Management Experience PMCDP for CEG Competency 1.12.2 Applicant Name: Applicant Supervisor: Date (mm/dd/yyyy): Directions: Step 1: Use this template to show project management experience for CEG competency 1.12.2. Rate your experience (0 - 5) in the following project management related activities using the scale below. Step 2: Sign the completed form and have your supervisor review and sign it. Step 3: Once approved by your supervisor, submit the form as part of your Level I certification package. Note: Project management experience is distinguished from FPD experience and applies to general project management activities and experience. Positions that do not count towards experience in project management include: program manager, property manager, health, safety and security (HSS) positions, and

331

INEEL Production Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Engineering and Environmental Laboratory Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures Appendix C: High Exposure Ranking Matrix

332

INEEL Production Workers Needs Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Surveillance Program Surveillance Program at Idaho National Engineering and Environmental Laboratory (INEEL) Phase I: Needs Assessment Robert Wages Oil, Chemical and Atomic International Union Steven Markowitz Queens College CUNY Medical School Sylvia Kieding Oil, Chemical and Atomic International Union Mark Griffon University of Massachusetts Lowell Michael Ellenbecker University of Massachusetts Lowell October 9, 1998 Work Performed Under DOE Contract No. DE-FCO3-97SF2 1512 TABLE OF CONTENTS Page Number Executive Summary 1 Part I: OVERVIEW Section I. Introduction 2 Section II. Methods 4 Section III. Principal Findings 8 Section IV. Need for Medical Surveillance and Risk Communication 20 PART II: METHODOLOGY AND RESULTS Section V. Exposure Assessment Appendix A: Risk Mapping Results Appendix B: Risk Map Exposures

333

Guidelines for Carcinogen Risk Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

P-03/001F P-03/001F March 2005 Guidelines for Carcinogen Risk Assessment Risk Assessment Forum U.S. Environmental Protection Agency Washington, DC DISCLAIMER This document has been reviewed in accordance with U.S. Environmental Protection Agency policy and approved for publication. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1. PURPOSE AND SCOPE OF THE GUIDELINES . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.2. ORGANIZATION AND APPLICATION OF THE GUIDELINES . . . . . . . . . . . 1-3 1.2.1. Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.2. Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1.3. KEY FEATURES OF THE CANCER GUIDELINES .

334

Thoughts on Hazard Assessment (Oct)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hazard Assessment of Chemical Air Hazard Assessment of Chemical Air Contaminants Measured in Residences J.M. Logue, T.E. McKone, M. H. Sherman, B.C. Singer Environmental Energy Technologies Division June 2010 Funding was provided by the U.S. Dept. of Energy Building Technologies Program, Office of Energy Efficiency and Renewable Energy under DOE Contract No. DE-AC02-05CH11231; by the U.S. Dept. of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control through Interagency Agreement I-PHI-01070, and by the California Energy Commission through Contract 500-08-06. LBNL Report Number 3650-E 1 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States

335

Winter Fuels Market Assessment 2000  

Gasoline and Diesel Fuel Update (EIA)

September 13, 2000 September 13, 2000 Winter Fuels Market Assessment 2000 09/14/2000 Click here to start Table of Contents Winter Fuels Market Assessment 2000 West Texas Intermediate Crude Oil Prices Perspective on Real Monthly World Oil Prices, 1976 - 2000 U.S. Crude Oil Stocks Total OECD Oil Stocks Distillate and Spot Crude Oil Prices Distillate Stocks Expected to Remain Low Distillate Stocks Are Important Part of East Coast Winter Supply Consumer Winter Heating Oil Costs Natural Gas Prices: Well Above Recent Averages Annual Real Natural Gas Prices by Sector End-of-Month Working Gas in .Underground Storage Residential Prices Do Not Reflect the Volatility Seen in Wellhead Prices Consumer Natural Gas Heating Costs Winter Weather Uncertainty Author: John Cook Email: jcook@eia.doe.gov

336

Preliminary melter performance assessment report  

SciTech Connect (OSTI)

The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.

Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

1994-08-01T23:59:59.000Z

337

Performance assessment of cogeneration plants  

Science Journals Connector (OSTI)

In this paper, performance assessment of various building cogeneration systems is conducted through energy and exergy efficiencies. The cogeneration plants considered include steam-turbine system, gas-turbine system, diesel-engine system, and geothermal system. Here, the cogeneration operation refers to the simultaneous generation of electrical power and heating for buildings (especially for space heating and hot water). Selected actual operating data are employed for analysis and performance assessment. The same amount of electrical and thermal product outputs is considered for all systems, except the diesel, to facilitate comparisons. Also, the effects of certain operating parameters (e.g., steam pressure, water temperature) on the energy and exergy efficiencies are investigated. The diesel-engine and geothermal systems appear to be thermodynamically more attractive, in that they have higher exergy efficiencies, than steam-turbine and gas-turbine systems. The results demonstrate that exergy analysis is a useful tool in performance assessments of cogeneration systems and permits meaningful comparisons of different cogeneration systems based on their merits. Such results can allow the efficiency of cogeneration systems to be increased, and the applications of cogeneration in larger energy systems to be configured more beneficially, leading to reductions in fuel use and environmental emissions.

Mehmet Kanoglu; Ibrahim Dincer

2009-01-01T23:59:59.000Z

338

E-Print Network 3.0 - assessment performance assessment Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OF ENGINEERING CYBERNETICS AND ROBOTICS, 60 Summary: , 60 2009 Sofia Service Oriented Architecture of Assessment Model1 Adelina Aleksieva... Assessment Model. To achieve...

339

Quantitative Assessment of Appropriate Technology  

Science Journals Connector (OSTI)

Abstract Economist Dr. E.F. Schumacher posited the concept of Intermediate Technology in his 1973 book Small is Beautiful, catalyzing the explosion of the appropriate technology (AT) movement. But how does one gauge the appropriateness of a technology? Quantitative assessment of AT can benefit sustainable community development (SCD) practitioners by way of decision-support and risk mitigation. The following research constructs a generalizable metric for quantitative assessment of AT, and develops a systematic process for its deployment. Forty-nine independent, emergent indicators of appropriateness were identified from a literature meta-analysis. The most prevalent indicators were as follows: community input, affordability, autonomy, transferability, community control, scalability, local availability of raw materials, and adaptability. Using these, a quantitative assessment tool was developed, called the Appropriate Technology Assessment Tool (ATAT). ATAT employs multi-criteria decision analysis (MCDA) methods to rank AT alternatives. In this way, inputs are aggregated using a weighted- sum method, giving the composite Appropriateness Index, (Ali). Using VBA coding, the author built ATAT via a simple form populated by the identified indicators. The form automates all necessary calculations, facilitating empirically rigorous quantitative assessment of AT by non-technical SCD workers. AT is only as appropriate as beneficiaries deem. A participatory research approach requires community stakeholders to rank preferred criteria for AT, and rate alternatives against the chosen criteria. This approach makes the tool customizable to local conditions. Using the Mini-Delphi Method, stakeholder opinions translate to ATAT inputs. A local case in the Westwood neighborhood of Denver, Colorado is examined to test ATAT efficacy and process viability. Prior to this research, University of Colorado graduate students partnered with local 501(c)3 Revision International to reduce winter heating costs in Westwood using a solar furnace that locals dubbed EZ Heat. ATAT quantified the appropriateness of EZ Heat as Ali = 4.2. This score lends empirical support to the AT's a priori deterministic selection. ATAT is designed to be free and accessible via Internet, and the author is investigating the potential of a mobile application. SCD and other community development practitioners often work in remote areas, and a mobile ATAT application will make the tool more useful.

A. Michael Bauer; Aaron Brown

2014-01-01T23:59:59.000Z

340

Risk assessment and toxicology databases for health effects assessment  

SciTech Connect (OSTI)

Scientific and technological developments bring unprecedented stress to our environment. Society has to predict the results of potential health risks from technologically based actions that may have serious, far-reaching consequences. The potential for error in making such predictions or assessment is great and multiplies with the increasing size and complexity of the problem being studied. Because of this, the availability and use of reliable data is the key to any successful forecasting effort. Scientific research and development generate new data and information. Much of the scientific data being produced daily is stored in computers for subsequent analysis. This situation provides both an invaluable resource and an enormous challenge. With large amounts of government funds being devoted to health and environmental research programs and with maintenance of our living environment at stake, we must make maximum use of the resulting data to forecast and avert catastrophic effects. Along with the readily available. The most efficient means of obtaining the data necessary for assessing the health effects of chemicals is to utilize applications include the toxicology databases and information files developed at ORNL. To make most efficient use of the data/information that has already been prepared, attention and resources should be directed toward projects that meticulously evaluate the available data/information and create specialized peer-reviewed value-added databases. Such projects include the National Library of Medicine`s Hazardous Substances Data Bank, and the U.S. Air Force Installation Restoration Toxicology Guide. These and similar value-added toxicology databases were developed at ORNL and are being maintained and updated. These databases and supporting information files, as well as some data evaluation techniques are discussed in this paper with special focus on how they are used to assess potential health effects of environmental agents. 19 refs., 5 tabs.

Lu, P.Y.; Wassom, J.S. [Oak Ridge National Laboratory, TN (United States)

1990-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Alternative Fuels Data Center: Renewable Fuels Assessment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Renewable Fuels Renewable Fuels Assessment to someone by E-mail Share Alternative Fuels Data Center: Renewable Fuels Assessment on Facebook Tweet about Alternative Fuels Data Center: Renewable Fuels Assessment on Twitter Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Google Bookmark Alternative Fuels Data Center: Renewable Fuels Assessment on Delicious Rank Alternative Fuels Data Center: Renewable Fuels Assessment on Digg Find More places to share Alternative Fuels Data Center: Renewable Fuels Assessment on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Renewable Fuels Assessment The U.S. Department of Defense (DOD) prepared a report, Opportunities for DOD Use of Alternative and Renewable Fuels, on the use and potential use of

342

Global Forest Resource Assessment | Open Energy Information  

Open Energy Info (EERE)

Global Forest Resource Assessment Global Forest Resource Assessment Jump to: navigation, search Tool Summary Name: Global Forest Resource Assessment Agency/Company /Organization: Food and Agriculture Organization of the United Nations Sector: Land Focus Area: Forestry Topics: Resource assessment Resource Type: Publications Website: www.fao.org/forestry/fra/fra2010/en/ Global Forest Resource Assessment Screenshot References: Global Forest Research Assessment[1] Overview "FAO, in cooperation with its member countries, has monitored the world's forests at 5 to 10 year intervals since 1946. These global assessments provide valuable information to policy-makers in countries, to international negotiations, arrangements and organizations related to forests and to the general public. The Global Forest Resources Assessment

343

Home Energy Assessments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Assessments Energy Assessments Home Energy Assessments Addthis Description A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Speakers Jason Dispenza Duration 1:44 Topic Home Weatherization Home Energy Audits Consumption Credit Energy Department Video MR. : Core to any energy audit, you've got a blower door test; an infrared camera scan; combustion safety testing for homes with gas

344

National Climate Assessment: Background and Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Background and Process Print E-mail Background and Process Print E-mail Please view the links below to find out more about the background and process of the National Climate Assessment: National Climate Assessment Development & Advisory Committee Charter ( PDF) National Climate Assessment Proposed 2013 Report Outline [updated on 12/08/2011] (PDF) Strategy On May 20th, 2011 the National Climate Assessment released the following two strategy documents: National Climate Assessment Strategy Summary National Climate Assessment Engagement Strategy Federal Register Notices November 18, 2013 National Climate Assessment and Development Advisory Committee (NCADAC) Notice of Open Meeting pdf | html A Notice by the National Oceanic and Atmospheric Administration on 10/29/2013 This notice sets forth the schedule of a forthcoming meeting of the DoC NOAA National Climate Assessment and Development Advisory Committee (NCADAC).

345

Probabilistic Wind Resource Assessment and Power Predictions  

E-Print Network [OSTI]

Probabilistic Wind Resource Assessment and Power Predictions Luca Delle Monache (lucadm Accurate wind resource assessment and power forecasts and reliable quanXficaXon of their uncertainty Mo5va5on · Power forecast: o Increase wind energy penetra

Firestone, Jeremy

346

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/  

E-Print Network [OSTI]

DRAFT ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY FLEXIBILITY ANALYSIS: This Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA For Amendments to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea and Aleutian Islands

347

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes March 6, 2008 Present: Diane Armpriest, Jane to the ad hoc assessment committee list, the associate dean list, and the department chair list

O'Laughlin, Jay

348

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes September 26, 2008 Present: Diane Armpriest, Alton why we assess ­ develop meaning for work Share success stories #12;The future of the Ad Hoc

O'Laughlin, Jay

349

Ad Hoc Assessment Committee Meeting Notes  

E-Print Network [OSTI]

Ad Hoc Assessment Committee Meeting Notes November 8, 2007 Present: Rula Awwad Rafferty timeline had been modified after input from the ad hoc assessment committee at its previous meeting

O'Laughlin, Jay

350

UK Climate Change Risk Assessment and National  

E-Print Network [OSTI]

UK Climate Change Risk Assessment and National Adaptation Programme Meg Patel Defra #12 change #12;Weather & climate impacts - economic, societal, environmental Water consumption per capita;Legislative Framework Climate Change Act 2008 Adaptation Reporting Power 2011 Climate Change Risk Assessment

Wirosoetisno, Djoko

351

Performance Assessment Report Domain CHP System  

E-Print Network [OSTI]

Performance Assessment Report for the Domain CHP System November 2005 By Burns & McDonnell Engineering #12;Domain CHP System Performance Assessment Report for the Packaged Cooling, Heating and Power

Oak Ridge National Laboratory

352

Assessment of exposure to depleted uranium  

Science Journals Connector (OSTI)

......Article Assessment of exposure to depleted uranium P. Roth V. Hollriegl E. Werner...for determining the amount of depleted uranium (DU) incorporated. The problems...Assessment of exposure to depleted uranium. | In most circumstances......

P. Roth; V. Hllriegl; E. Werner; P. Schramel

2003-07-01T23:59:59.000Z

353

PHEV Battery Cost Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Meeting, June 7-11, 2010 -- Washington D.C. es001barnett2010o.pdf More Documents & Publications PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment PHEV...

354

National Geothermal Resource Assessment and Classification  

Broader source: Energy.gov [DOE]

National Geothermal Resource Assessment and Classification presentation at the April 2013 peer review meeting held in Denver, Colorado.

355

EPA`s risk assessment guidelines: Overview  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) risk assessment guidelines for cancer, quantification, and exposure issues are discussed.

Patton, D.E. [Environmental Protection Agency, Washington, DC (United States)

1990-12-31T23:59:59.000Z

356

Articles about Resource Assessment and Characterization  

Broader source: Energy.gov [DOE]

Stories about resource assessment and characterization featured by the U.S. Department of Energy (DOE) Wind Program.

357

Pumping System Assessment Tool Fact Sheet  

Broader source: Energy.gov [DOE]

This fact sheet describes how industrial plants can improve their pumping system efficiency using AMO's Pumping System Assessment Tool (PSAT).

358

EA-1679: Preliminary Environmental Assessment | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington...

359

Sandia National Laboratories: Solar Resource Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tagged with: Energy * photovoltaic * Photovoltaics * PV * Renewable Energy * solar * Solar Energy * Solar Research * Solar Resource Assessment Comments are closed. Renewable...

360

Single Assessment Pass Rate South Carolina  

E-Print Network [OSTI]

Single Assessment Pass Rate South Carolina Academic Year 2004 - 2005 ETS Type of Assessment Test in Cohort 2,218 in Cohort #12;Single Assessment Pass Rate South Carolina Academic Year 2004 - 2005 ETS Type, Part 0063 Middle School Mathematics 0069 Chemistry, Physics and General Science 0070 Social Studies

Kasman, Alex

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Reviewed: Spring 2008 MSU Departmental Assessment Plan  

E-Print Network [OSTI]

1 Reviewed: Spring 2008 MSU Departmental Assessment Plan 2007-2008 Department: Electrical realistic planning for program assessment data and analysis. The results of this indepth review of the ECE subsequent on-site accreditation reviews. After careful consideration, the following Assessment Plan model

Dyer, Bill

362

Owyhee Subbasin Plan Chapter 2 Technical Assessment  

E-Print Network [OSTI]

Technical Assessment. Steven C. Vigg, Editor. Final Draft. Submitted to the Northwest Power and ConservationOwyhee Subbasin Plan Chapter 2 Technical Assessment Prepared By: The Shoshone-Paiute Tribes Program. #12;Owyhee Subbasin Plan Chapter 2 OSP Technical Assessment Final Draft May 28, 2004i Document

363

An environmental assessment system for environmental technologies  

Science Journals Connector (OSTI)

A new model for the environmental assessment of environmental technologies, EASETECH, has been developed. The primary aim of EASETECH is to perform life-cycle assessment (LCA) of complex systems handling heterogeneous material flows. The objectives of ... Keywords: EASETECH, Flow modelling, LCA model, Life cycle assessment, Uncertainty, Waste

Julie Clavreul, Hubert Baumeister, Thomas H. Christensen, Anders Damgaard

2014-10-01T23:59:59.000Z

364

Assessment of University Sustainability Activities SUSTAINABILITY TRACKING,  

E-Print Network [OSTI]

Assessment of University Sustainability Activities under the SUSTAINABILITY TRACKING, ASSESSMENT Rashed-Ali, PhD. Prepared for: The UTSA Sustainability Council May 3rd , 2011 #12;yhd/s ^hDD Zz 2 | P a g-Ali, Assistant Professor in the College of Architecture, conducted a survey and assessment of UTSA sustainability

Dodla, Ramana

365

Assessment of government tribology programs  

SciTech Connect (OSTI)

An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

Peterson, M.B.; Levinson, T.M.

1985-09-01T23:59:59.000Z

366

Biotechnology's ties to academia assessed  

Science Journals Connector (OSTI)

Biotechnology's ties to academia assessed ... Two prominent figures in genetic engineering, one from academe and one from industry, gave generally upbeat analyses of the state of research in the field, the relationships between universities and the biotechnology industry, and the prospects for future growth of that industry to a symposium held recently in San Francisco. ... The symposium, which was sponsored by Beckman Instruments, drew about 180 participants from the biotechnology industry and companies thinking about becoming involved in biotechnology, as well as from universities and financial institutions. ...

1982-04-26T23:59:59.000Z

367

Assessment of Residential GSHP System  

SciTech Connect (OSTI)

This report first briefly reviews geothermal heat pump (GHP) technology and the current status of the GHP industry in the United States. Then it assesses the potential national benefits, in terms of energy savings, reduced summer peak electrical demand, consumer energy cost savings, and reduced CO{sub 2} emissions from retrofitting the space heating, space cooling, and water heating systems in existing U.S. single-family homes with state-of-the-art GHP systems. The investment for retrofitting typical U.S. single-family homes with state-of-the-art GHP systems is also analyzed using the metrics of net present value and levelized cost.

Liu, Xiaobing [ORNL

2010-09-01T23:59:59.000Z

368

Nuclear weapon system risk assessment  

SciTech Connect (OSTI)

Probabilistic risk assessment (PRA) is a process for evaluating hazardous operations by considering what can go wrong, the likelihood of these undesired events, and the resultant consequences. Techniques used in PRA originated in the 1960s. Although there were early exploratory applications to nuclear weapons and other technologies, the first major application of these techniques was in the Reactor Safety Study, WASH-1400, {sup 1} in which the risks of nuclear power accidents were thoroughly investigated for the first time. Recently, these techniques have begun to be adapted to nuclear weapon system applications. This report discusses this application to nuclear weapon systems.

Carlson, D.D.

1993-11-01T23:59:59.000Z

369

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 28, 1995 September 28, 1995 EA-0981: Final Environmental Assessment Solid Waste Retrieval Complex, Enhanced Radioactive and Mixed Waste Storage Facility, Infrastructure Upgrades, and Central Waste Support Complex, Hanford Site, Richland, Washington September 22, 1995 EA-1092: Final Environmental Assessment Decontamination and Dismantlement September 8, 1995 EA-1097: Final Environmental Assessment Solid waste Disposal - Nevada Test Site, Nye County, Nevada September 8, 1995 EA-1107: Final Environmental Assessment Construction and Operation of a Office Building at the Stanford Linear Accelerator Center September 8, 1995 EA-1087: Final Environmental Assessment Proposed Induction Linac System Experiments in Building 51B at Lawrence Berkeley National Laboratory, Berkeley, California

370

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

, 2006 , 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington January 2, 2006 EA-1489: Final Environmental Assessment Construction and Operation of the Howard T. Ricketts Laboratory December 1, 2005 EA-1545: Final Environmental Assessment Proposed Withdrawal of Public Lands Within and Surrounding the Calliente Rail Corridor, Nevada December 1, 2005 EA-1538: Final Environmental Assessment Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site November 1, 2005 EA-1523: Final Environmental Assessment Address Proposed Site Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Parish, Louisiana

371

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 4, 2011 November 4, 2011 EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) November 1, 2011 EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory Modernization Planning October 31, 2011 EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research Center, Battleground Energy Recovery Project, Deer Park, Harris County, Texas (October 2011) October 28, 2011 EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) October 20, 2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado

372

Dermal Exposure Assessment: Principles and Applications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health and Health and EPA/600/8-91/011B Environmental Protection Environmental Assessment January 1992 Agency Washington, DC 20460 Interim Report Research and Development Dermal Exposure Assessment: Principles and Applications EPA/600/8 -91/OllB January 1992 Interim Report DERMAL EXPOSURE ASSESSMENT: PRINCIPLES AND APPLICATIONS Exposure Assessment Group Office of Health and Environmental Assessment U.S. Environmental Protection Agency Washington, D.C. 20460 DISCLAIMER This document is an interim report subject to review by the Science Advisory Board. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii

373

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2002 1, 2002 EA-1402: Final Environmental Assessment Methane Energy and Agricultural Development Port of Tillamook Bay Dairy Digester Project, Tillamook County, Oregon December 12, 2001 EA-1321: Final Environmental Assessment Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York December 5, 2001 EA-1391: Final Environmental Assessment Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources September 30, 2001 EA-1383: Final Environmental Assessment Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California

374

ORISE: Environmental Assessment and Health Physics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Assessments and Health Physics Environmental Assessments and Health Physics Performing environmental assessments and independent verification is essential to building public trust and confidence in radiological cleanup. As the U.S. Department of Energy (DOE) and other government agencies target contaminated sites across the country for decontamination and decommissioning, strict guidelines must be followed to ensure that property is effectively remediated before being released for public or private use. Through a combination of environmental assessments, health physics services, and radiochemistry analyses, the Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessment and verification at DOE cleanup sites across the country. ORISE applies its

375

Groundwater Data Package for Hanford Assessments  

SciTech Connect (OSTI)

This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management and Integration Project (#47043).

Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.; Freedman, Vicky L.

2006-01-31T23:59:59.000Z

376

Chapter 14 - Pipeline Flow Risk Assessment  

Science Journals Connector (OSTI)

Abstract Risk assessment is the process of assessing risks and factors influencing the level of safety of a project. It involves researching how hazardous events or states develop and interact to cause an accident. The risk assessment effort should be tailored to the level and source of technical risk involved with the project and the project stage being considered. The assessment of technical risk will take different forms in different stages of the project. Pipeline flow risk mainly includes fluid leakage and blockage happening in the pipelines. This chapter describes the application of Quantitative Risk Assessment (QRA) for the blockage in the oil and gas pipelines.

Yong Bai; Qiang Bai

2014-01-01T23:59:59.000Z

377

Technology Needs Assessment Handbook | Open Energy Information  

Open Energy Info (EERE)

Technology Needs Assessment Handbook Technology Needs Assessment Handbook Jump to: navigation, search Tool Summary Name: Technology Needs Assessment Handbook Agency/Company /Organization: United Nations Development Programme Partner: United Nations Environment Programme Sector: Energy, Land Focus Area: Energy Efficiency Topics: Low emission development planning, Background analysis Resource Type: Guide/manual, Training materials, Lessons learned/best practices Website: content.undp.org/go/newsroom/publications/environment-energy/www-ee-li References: TNA Homepage[1] Logo: Technology Needs Assessment Handbook To assist countries, UNDP, in collaboration with Climate Technology Initiative (CTI), the EGTT and the UNFCCC Secretariat, developed a Handbook for conducting technology needs assessments for climate change.

378

School of Film & Photography assessment plan update for Fall 2009 -1 -MSU Departmental Assessment Plan  

E-Print Network [OSTI]

and Natural History Filmmaking #12;School of Film & Photography assessment plan update for Fall 2009 - 2, video and television production, and science and natural filmmaking. Program Assessment Review and PlansSchool of Film & Photography assessment plan update for Fall 2009 - 1 - MSU Departmental Assessment

Maxwell, Bruce D.

379

Risk Analysis and Probabilistic Survivability Assessment (RAPSA): An Assessment Approach for Power Substation Hardening1  

E-Print Network [OSTI]

or infrastructure system, and cause widespread fear from a major or prolonged service disruption [8]. In assessingRisk Analysis and Probabilistic Survivability Assessment (RAPSA): An Assessment Approach for Power System Analysis (SSA) with Probability Risk Assessment (PRA). The method adds quantitative information

Krings, Axel W.

380

Performance Assessment Community of Practice Technical Exchange  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Department of Energy is hosting a Technical Exchange at the Hanford Site on The Department of Energy is hosting a Technical Exchange at the Hanford Site on April 13-14, 2010. The Performance Assessment Community of Practice has been chartered to advise the Office of Environmental Management Tank Waste Corporate Board regarding performance assessments and performance assessment-like analyses, promote consistency in the preparation of performance assessments across the Department of Energy (DOE) complex, foster exchange of information among performance assessment practitioners, and develop appropriate guidance for performance assessments such that they are based on sound science and are defensible. The purpose of this technical exchange is to provide a venue for performance assessment and risk assessment practitioners, managers and regulators, and contributors to the Cementitious Barriers Partnership and Advanced Simulation Capability for Environmental Management project to share plans and experiences and share ideas for future performance assessment and risk assessment modeling. The technical exchange will include a combination of plenary presentations and discussions with breakout sessions for specific topics. Discussions will emphasize areas for improved consistency and solicit suggestions for future developments related to modeling tools. A breakout discussion session is also planned to address: DOE Order 435.1 Update, regulatory challenges for performance and risk assessment modeling, and other topical areas. Arrangements have also been made for a GoldSim modeling roundtable at the conclusion of the workshop for participants who are interested in sharing experiences related to the use of GoldSim for their simulations.

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Uncertainties in risk assessment at USDOE facilities  

SciTech Connect (OSTI)

The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

1994-01-01T23:59:59.000Z

382

Alderwood Area Service Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration's (BPA's) proposal to build a new 115-kV transmission line and 115-12.5-kV, 25-MW substation in the Alderwood, Oregon, area is discussed in the attached Environmental Assessment. The proposed substation site has been relocated about 500 feet east of the site outlined in the Environmental Assessment, but in the same field. This is not a substantial change relevant to environmental concerns. Environmental impacts of the new site differ only in that: Two residences will be visually affected. The substation will be directly across Highway 36 from two houses and would be seen in their primary views. This impact will be mitigated by landscaping the substation to create a vegetative screen. To provide access to the new site and provide for Blachly-Lane Cooperative's distribution lines, a 60-foot-wide right-of-way about 200 feet long will be needed. The total transmission line length will be less than originally planned. However, the tapline into the substation will be about 50 feet longer. 4 figs.

United States. Bonneville Power Administration.

1982-06-01T23:59:59.000Z

383

Oak Ridge Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

384

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

12, 1994 12, 1994 EA-0939: Final Environmental Assessment Blue Creek Winter Range: Wildlife Mitigation Project December 5, 1994 EA-0813: Final Environmental Assessment The Tokamak Fusion Test Reactor Decontamination and Decommissioning Project and the Tokamak Physics Experiment at the Princeton Plasma Physics Laboratory November 15, 1994 EA-1002: Final Environmental Assessment October 27, 1994 EA-0965: Final Environmental Assessment Cancer Research Center Indiana University School of Medicine October 27, 1994 EA-1001: Final Environmental Assessment Commercialization of the Mound Plant October 24, 1994 EA-0952: Final Environmental Assessment The Louisiana State University Waste-to-Energy Incinerator October 20, 1994 EA-0962: Final Environmental Assessment Construction and Routine Operation of a 12-kilovolt Overhead Powerline and

385

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 31, 1996 August 31, 1996 EA-1086: Final Environmental Assessment Amendments to 10 CFR Part 835 (Revised Version - 6/98) August 7, 1996 EA-1160: Final Environmental Assessment Northeast Oregon Wildlife Mitigation Project July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic) July 15, 1996 EA-1149: Final Environmental Assessment Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory June 8, 1996 EA-0930: Final Environmental Assessment Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado June 1, 1996 EA-1068: Final Programmatic Environmental Assessment State Energy Conservation Program May 21, 1996 EA-1093: Final Environmental Assessment Surface Water Drainage System

386

PG&E Reconductoring Project Biological Assessment (Revised) ...  

Broader source: Energy.gov (indexed) [DOE]

PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (Revised) PG&E Reconductoring Project Biological Assessment (1216...

387

Oak Ridge Reservation Needs Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge Reservation Needs Assessment Oak Ridge Reservation Needs Assessment December 1997 This Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security...

388

EA-1611: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1611: Final Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado This Environmental Assessment (EA) was prepared in...

389

Clean Energy Finance Guide, Chapter 12: Commercial Property-Assessed...  

Broader source: Energy.gov (indexed) [DOE]

Guide to Commercial Property-Assessed Clean Energy (PACE) Financing Commercial Property Assessed Clean Energy (PACE) Primer Commercial Property Assessed Clean Energy (PACE) Primer...

390

Guide to Commercial Property-Assessed Clean Energy (PACE) Financing...  

Broader source: Energy.gov (indexed) [DOE]

12: Commercial Property-Assessed Clean Energy (PACE) Financing Commercial Property Assessed Clean Energy (PACE) Primer Commercial Property Assessed Clean Energy (PACE) Primer...

391

CRAD, Machine Shop Safe Operations Assessment Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

Machine Shop Safe Operations Assessment Plan CRAD, Machine Shop Safe Operations Assessment Plan Performance Objective: The purpose of this assessment is to verify that machine shop...

392

Property-Assessed Clean Energy Programs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Financing Financing Structures Property-Assessed Clean Energy Programs Property-Assessed Clean Energy Programs The property-assessed clean energy (PACE) model is an...

393

Waste Isolation Pilot Plant Needs Assessment | Department of...  

Office of Environmental Management (EM)

Waste Isolation Pilot Plant Needs Assessment Waste Isolation Pilot Plant Needs Assessment May 2012 This Needs Assessment for former Waste Isolation Pilot Plant production workers...

394

CRAD, Conduct of Operations Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Conduct of Operations Assessment Plan CRAD, Conduct of Operations Assessment Plan Performance Objective: The purpose of this assessment is to verify programmatic implementation of...

395

Step 9: Assess Your Progress | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Assess Your Progress Step 9: Assess Your Progress With marketing activities underway, you will want to assess whether these activities are achieving the objectives they were...

396

EA-1595: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1595: Final Environmental Assessment Davis-Mead 230-kV Transmission Line Reconductor Project This environmental assessment's proposed action is...

397

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area CPM User's Guide Area CPM User's Guide 1. Introduction Field sampling has the potential to be an extremely time-consuming and expensive portion of a radiological site remediation. Collected samples must be shipped to an off-site laboratory or counted in an on-site mobile unit in order to establish areas of contamination and to ensure that acceptable residual levels of contaminants remain. The Area CPM Calculator is a web-based calculator that estimates a gamma detector response for a target level of surface contamination. This calculator provides a rapid, exceptionally cost-effective assessment of contamination and cleanup standards based on field instrument data, which minimizes the use of more expensive sample collection and laboratory analysis. A correction factor for cpm analysis established between this

398

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Frequently Asked Questions Frequently Asked Questions This page represents the most commonly approached topics from our users. What internet browser works best for the RAIS? We attempt to accommodate every browser. If there is a problem viewing the RAIS pages or downloading items, let us know what browser you are using and we will try and fix the problem. How can I use the information on the RAIS? The information on the RAIS can be used for teaching material and performing risk assessments that comply with EPA guidance. Feel free to use the information; it is available to the public. However, please give proper credit to the RAIS and the team from Oak Ridge National Laboratory and The University of Tennessee where you see fit. Also, the databases we maintain are updated on a quarterly basis or sooner, so you may need to "time-stamp"

399

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Glossary of Environmental Restoration Terms Glossary of Environmental Restoration Terms These definitions are from the United States Department of Energy (DOE) Oak Ridge Operations Office (ORO) Environmental Restoration/Waste Management Risk Assessment Program staff and affiliates and the following sources: Click on the letter that begins the term for which you are searching. To search for another term, at the end of each definition, click on the. If a link leaves the glossary to go to an outside page you will see a. A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A Abatement: The reduction in degree or intensity of pollution. Absorbed Dose: The energy imparted to a unit mass of matter by ionizing radiation. The unit of absorbed dose is the rad or gray. One rad equals 100 ergs per gram. The amount of a substance absorbed into the body, usually

400

Hanford Construction Workers Needs Assessment  

Broader source: Energy.gov (indexed) [DOE]

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

National Climate Assessment: Indicators System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Indicators System Print E-mail Indicators System Print E-mail What are the goals for the NCA indicators? The vision for the National Climate Assessment (NCA) is to create a system of indicators that will help inform policy-makers and citizens understand key aspects of our changing climate. Scientific information about physical climate conditions, climate impacts, vulnerabilities, and preparedness will be tracked and compiled. These measures are called indicators. The goals of the Indicators System are to: Provide meaningful, authoritative climate-relevant measures about the status, rates, and trends of key physical, ecological, and societal variables and values Inform decisions on management, research, and education at regional to national scales Identify climate-related conditions and impacts to help develop effective mitigation and adaptation measures

402

Process Waste Assessment, Mechanics Shop  

SciTech Connect (OSTI)

This Process Waste Assessment was conducted to evaluate hazardous wastes generated in the Mechanics Shop. The Mechanics Shop maintains and repairs motorized vehicles and equipment on the SNL/California site, to include motorized carts, backhoes, street sweepers, trash truck, portable emergency generators, trencher, portable crane, and man lifts. The major hazardous waste streams routinely generated by the Mechanics Shop are used oil, spent off filters, oily rags, and spent batteries. The used off and spent off filters make up a significant portion of the overall hazardous waste stream. Waste oil and spent batteries are sent off-site for recycling. The rags and spent on filters are not recycled. They are disposed of as hazardous waste. Mechanics Shop personnel continuously look for opportunities to minimize hazardous wastes.

Phillips, N.M.

1993-05-01T23:59:59.000Z

403

NUREG-1150 risk assessment methodology  

SciTech Connect (OSTI)

This paper describes the methodology developed in support of the US Nuclear Regulatory Commission's (NCR's) evaluation of severe accident risks in NUREG-1150. After the accident at Three Mile Island, Unit 2, the NRC initiated a sever accident research program to develop an improved understanding of severe accidents and to provide a second technical basis to support regulatory decisions in this area. A key product of this program is NUREG-1150, which provides estimates of risk for several nuclear reactors of different design. The principal technical analyses for NUREG-1150 were performed at Sandia National Labs. under the Severe Accident Risk Reduction Program and the Accident Sequence Evaluation Program. A major aspect of the work was the development of a methodology that improved upon previous full-scale probabilistic risk assessments (PRA) in several areas which are described.

Benjamin, A.S.; Amos, C.N.; Cunningham, M.A.; Murphy, J.A.

1987-01-01T23:59:59.000Z

404

Environmental assessment and social justice  

SciTech Connect (OSTI)

The purpose of this document is to describe an approach to assessing environmental justice issues at the start of proposed project. It is a structural approach to screening using readily available census data and commercial products that emphasizes the ability to replicate results and provide systematic data that can be used to identify spatial inequities. While our discussion of the methodology addresses only public health and safety issues related to certain minority and cohort sub-groups, systematic use of methodology could provide a valuable screening tool for identifying impacts particular to low-income groups. While the assumptions can be questioned as to applicability, they are based both on theory and practical knowledge.

Vogt, B.M.; Sorensen, J.H. [Oak Ridge National Lab., TN (United States); Hardee, H. [Tennessee Univ., Knoxville, TN (United States)

1995-03-01T23:59:59.000Z

405

Territorial energy assessment. Final report  

SciTech Connect (OSTI)

This assessment is concerned with energy planning for the governments of the American territories of Guam and American Samoa, and of the four nations that are now emerging from the United Nations Trust Territory of the Pacific Islands: the Commonwealth of the Northern Mariana Islands, the Republic of the Marshall Islands, the Republic of Palau, and the Federated States of Micronesia. This study was directed by the United States Congress under Public Law 96-597, and carried out by the United States Department of Energy in cooperation with the respective island governments. This report addressed the current and future energy needs of the island governments and considers the feasibility of employing alternate sources of energy, especially indigenous renewable energy resources, to reduce dependence on petroleum-based fuels.

Not Available

1982-12-01T23:59:59.000Z

406

Debris assessment for Skybridge constellation  

Science Journals Connector (OSTI)

The Skybridge system is a worldwide ATM broadband communication system based on a 80 low Earth orbit satellite constellation. The minimization of space debris generation has been taken into account very early in the frame of this program. The objectives are, first to identify the contribution of Skybridge to the space debris generation and secondly to assess the risk due to space debris for the whole system. This paper summarizes the approach of the Skybridge program for debris assessment and mitigation. As no international regulation dealing with this subject exists, the analysis is based on the existing NASA 1740 Safety Standard. The methodology and the software presented in this document were applied to demonstrate the compliance of Skybridge with the requirements. In addition the new CNES standard was used to derive additional requirements. The first point deals with the production of space debris in the various mission phases: this concerns debris released during launch, constellation deployment and mission operations. Besides these normal operations, space debris can also be generated through material ageing or in case of accidents such as explosion due to on-board stored energy or collision with other orbiting objects. In the second part the collision risk is analyzed: the probability of collision with the large cataloged objects is determined. Concerning the smaller debris, the flux models give the probability of impact per surface unit: the analysis identifies components most vulnerable to debris impact together with their shielding and gives the associated probability of failure taking into account the architecture of the satellite. The problem of the post-mission disposal procedure is then discussed in the third part.

F. Alby; M. Danvel; C. Hourtolle; E. Frayssinhes

2003-01-01T23:59:59.000Z

407

Griffiss AFB integrated resource assessment  

SciTech Connect (OSTI)

The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk's primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

1993-02-01T23:59:59.000Z

408

Technology modernization assessment flexible automation  

SciTech Connect (OSTI)

The objectives of this report are: to present technology assessment guidelines to be considered in conjunction with defense regulations before an automation project is developed to give examples showing how assessment guidelines may be applied to a current project to present several potential areas where automation might be applied successfully in the depot system. Depots perform primarily repair and remanufacturing operations, with limited small batch manufacturing runs. While certain activities (such as Management Information Systems and warehousing) are directly applicable to either environment, the majority of applications will require combining existing and emerging technologies in different ways, with the special needs of depot remanufacturing environment. Industry generally enjoys the ability to make revisions to its product lines seasonally, followed by batch runs of thousands or more. Depot batch runs are in the tens, at best the hundreds, of parts with a potential for large variation in product mix; reconfiguration may be required on a week-to-week basis. This need for a higher degree of flexibility suggests a higher level of operator interaction, and, in turn, control systems that go beyond the state of the art for less flexible automation and industry in general. This report investigates the benefits and barriers to automation and concludes that, while significant benefits do exist for automation, depots must be prepared to carefully investigate the technical feasibility of each opportunity and the life-cycle costs associated with implementation. Implementation is suggested in two ways: (1) develop an implementation plan for automation technologies based on results of small demonstration automation projects; (2) use phased implementation for both these and later stage automation projects to allow major technical and administrative risk issues to be addressed. 10 refs., 2 figs., 2 tabs. (JF)

Bennett, D.W.; Boyd, D.R.; Hansen, N.H.; Hansen, M.A.; Yount, J.A.

1990-12-01T23:59:59.000Z

409

A Review of Quantitative Approaches to Intelligent Building Assessment  

E-Print Network [OSTI]

This paper provides a review of the assessment methods of intelligent buildings (IBs). Based on a review of rating method currently used for building assessment, 6 rating systems for IB assessment are compared according to assessment clusters...

Chen, Z.; Clements-Croome, D. J.; Hong, J.; Li, H.; Xu, Q.

2006-01-01T23:59:59.000Z

410

Zone heated inlet ignited diesel particulate filter regeneration  

SciTech Connect (OSTI)

An exhaust system that processes exhaust generated by an engine is provided. The system includes: a particulate filter (PF) that is disposed downstream of the engine and that filters particulates from the exhaust; and a grid that includes electrically resistive material that is segmented by non-conductive material into a plurality of zones and wherein the grid is applied to an exterior upstream surface of the PF.

Gonze, Eugene V [Pinckney, MI; Ament, Frank [Troy, MI

2012-06-26T23:59:59.000Z

411

CHARACTERIZATION OF HIGH SPEED INLETS USING GLOBAL MEASUREMENT TECHNIQUES.  

E-Print Network [OSTI]

??After the end of the NASA space shuttle programme, there has been resurgence of interestin developing a single stage-to-orbit spacecraft. The key technology to realize (more)

Che Idris, Azam

2014-01-01T23:59:59.000Z

412

A dispersion curve study of dredged spoil basin inlets  

E-Print Network [OSTI]

by the developed methods. The ma)or differences between the knowledge of dredging spoil basins and that of normal settling tanks is that a great deal of experimental effort has been put into the latter, and combined with the accumulated monitoring... by the developed methods. The ma)or differences between the knowledge of dredging spoil basins and that of normal settling tanks is that a great deal of experimental effort has been put into the latter, and combined with the accumulated monitoring...

Male, Robert

2012-06-07T23:59:59.000Z

413

Methane oxidation rates in the anaerobic sediments of Saanich Inlet  

Science Journals Connector (OSTI)

water methane concentration were avail- able. ... water solute concentrations and methane oxidation rates ..... Diffusion of light paraffin hydrocarbons in water.

2000-02-09T23:59:59.000Z

414

The Roosevelt Inlet shipwreck: identification, analysis, and historical context  

E-Print Network [OSTI]

for breaking the provisions of the Navigation Acts is not clear, but it is possible that he is attempting to placate merchants and citizens unwilling to purchase British manufactured goods. It is also possible that he is simply able to make a greater profit.... This revolution affected not only the wealthy, but also the middling and lower classes. For the first time American colonists had a choice in the goods they purchased. One German minister traveling through Pennsylvania in the 1750s commented on the wide...

McVae, Bridget Christine

2008-10-10T23:59:59.000Z

415

Environmental Assessments (EA) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD December 19, 2013 EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky November 15, 2013 EA-1752: Draft Environmental Assessment

416

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

417

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

27, 1998 27, 1998 EA-1236: Final Site-Wide Environmental Assessment Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, Wyoming December 1, 1997 EA-1175: Final Environmental Assessment Proposed Title Transfer of East Tennessee Park Land and Facilities November 21, 1997 EA-1170: Final Environmental Assessment Area 5 Radioactive Waste Management Site Access Improvement at the Nevada Test Site October 16, 1997 EA-1219: Final Environmental Assessment Hoe Creek Underground Coal Gasification Test Site Remediation October 8, 1997 EA-1212: Final Environmental Assessment Lease of Land for the Development of a Research Park at Los Alamos National Laboratory July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

418

Impact Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Impact Assessment Toolkit Impact Assessment Toolkit (Redirected from Gateway:International/Economic and Environmental Impacts) Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other

419

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 1, 2012 March 1, 2012 EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN February 29, 2012 EA-1884: Draft Environmental Assessment Wray Wind Energy Project, Town of Wray, Yuma County, CO February 29, 2012 EA-1909: Draft Environmental Assessment South Table Wind Project, Kimball County, Nebraska February 13, 2012 EA-1779: Final Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN February 13, 2012 EA-1779: Finding of No Significant Impact and Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, TN January 25, 2012 EA-1722-SA-001: Supplement Analysis for an Environmental Assessment

420

Resource Assessment and Characterization | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resource Assessment and Characterization Resource Assessment and Characterization Resource Assessment and Characterization The Water Power Program has released reports and maps that assess the total technically recoverable energy available in the nation's powered dams, non-powered dams, and untapped stream-reaches. These resource assessments are pivotal to understanding hydropower's potential for future electricity production. Hydropower already provides 6-8% of the nation's electricity, but more potential resides in our flowing waters to provide clean electricity to communities and cities across the United States. There are three levels of resource assessments performed by the water industry. Theoretical potential is the annual average amount of physical energy that is hypothetically available. Technical resource potential is

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 2, 2010 August 2, 2010 EA-1729: Final Environmental Assessment Removal Actions At The Technical Area III Classified Waste Landfill, Sandia National Laboratories, New Mexico July 1, 2010 EA-1743: Final Environmental Assessment Air Products And Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio July 1, 2010 EA-1740: Final Environmental Assessment Thermal Energy Corporation Combined Heat And Power Project, Houston, Texas July 1, 2010 EA-1698: Final Environmental Assessment Baldwin Wind Energy Center July 1, 2010 EA-1696: Final Environmental Assessment Pantex Renewable Energy Project June 25, 2010 EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire June 16, 2010 EA-1741: Draft Environmental Assessment

422

Land Use Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Land Use Assessment Toolkit Land Use Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

423

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 1, 2011 June 1, 2011 EA-1848: Final Environmental Assessment Loan Guarantee To Fulcrum Sierra Biofuels, LLC For A Waste-To-Ethanol Facility In Mccarran, Storey County, Nevada June 1, 2011 EA-1858: Final Environmental Assessment Nippon Paper Industries USA Company Biomass Cogeneration Project, Port Angeles, Washington June 1, 2011 EA-1875: Final Environmental Assessment Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine May 31, 2011 EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado May 27, 2011 EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine May 17, 2011 EA-1731: Final Environmental Assessment

424

Climate VISION: Resources and Links - Plant Assessments  

Office of Scientific and Technical Information (OSTI)

Plant Assessments Plant Assessments Plant-Wide Assessments Plant-wide assessments are one way to work with the DOE Industrial Technologies Program—most companies realize a minimum of $1 million in annual energy savings after just one assessment. Plants are selected through a competitive solicitation process, and agree to a minimum 50% cost-share for implementing the assessment. An industry-defined team conducts an on-site analysis of total energy use and identifies opportunities to save energy in your overall operations and in motor, steam, compressed air, and process heating systems. The recommendations could include implementing emerging technologies that would be particularly effective in your operation. These emerging technologies, although on the forefront of industrial manufacturing, are successful and commercially

425

Bioenergy Assessment Toolkit | Open Energy Information  

Open Energy Info (EERE)

Bioenergy Assessment Toolkit Bioenergy Assessment Toolkit Jump to: navigation, search Stage 3 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

426

EA-1138: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment Proposed Energy Conservation Standards for Refrigerators, Refrigerator-Freezers, and Freezers This Environmental Assessment (EA) presents the associated...

427

Non-Powered Dams Resource Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Non-Powered Dams Resource Assessment Non-Powered Dams Resource Assessment 652011waterpowerpeerreviewnpdornloctober2011.pptx More Documents & Publications An...

428

EA-1931: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1931: Final Environmental Assessment Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville...

429

EA-1896: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1896: Final Environmental Assessment Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North...

430

EA-1931: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

431

Receptor modeling assessment of particle total exposure assessment methodology data  

SciTech Connect (OSTI)

Data from the 1991 Particle Total Exposure Assessment Methodology (PTEAM) study in Riverside, CA, were analyzed using a new receptor modeling method. In this study, ambient (outdoor), indoor, and personal particulate matter (PM) concentrations and elemental concentrations of PM{sub 2.5} and PM{sub 10} were measured for a number of participants. These measurements made is possible to relate the pollution to which people were exposed throughout their daily activities with the outdoor air conditions. Personal daytime concentrations of the PM{sub 10} and majority of elements were significantly higher than outdoor or indoor concentrations, suggesting that a significant part of personal aerosol exposure is the result of personal daily activities. Possible sources of additional particulate mass include resuspension of particles that penetrate from the outdoors and formation of new particles during cooking, smoking, etc. Positive matrix factorization analysis was performed to describe the sources of personal exposure. To identify relative contribution of different sources, regression of the particulate matter mass against the factor contributions was performed. Major sources of PM{sub 2.5} were oil combustion, nonferrous metal operations, and motor vehicles. The mass contributions of particles from these sources were similar for outdoor air and personal exposure. Personal exposure to particles from these sources can be controlled by changing outdoor sources. The primary source of PM{sub 10} was soil.

Yakovleva, E.; Hopke, P.K.; Wallace, L.

1999-10-15T23:59:59.000Z

432

Fort Stewart integrated resource assessment. Volume 3: Resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

1993-10-01T23:59:59.000Z

433

Fort Drum integrated resource assessment. Volume 3, Resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

434

Variability Assessment of Groundwater Exposure to Pesticides and Its Consideration in Life-Cycle Assessment  

Science Journals Connector (OSTI)

In the present paper, leaching scenarios typical in European agriculture are defined. ... Due to the inherent toxicity of many pesticides, the application of pesticides in agriculture has been extensively assessed with tools such as risk assessment and, less frequently, with life-cycle assessment (LCA). ... The goal of this paper is (a) to assess the variability of pesticide leaching to groundwater in EU agriculture, (b) to quantify the contribution of substance-property, site, and farming-practice parameters to variability, thus identifying the most important parameters for consideration in the assessment of pesticide leaching, and (c) to suggest pos sibilities for incorporating such variability assessment in LCA. ...

Georg Geisler; Stefanie Hellweg; Simon Liechti; Konrad Hungerbhler

2004-07-17T23:59:59.000Z

435

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

436

Useful Resources- Vulnerability Assessment Team - Nuclear Engineering  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Selected Publications Selected Publications VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

437

Definitions, Seals - Vulnerability Assessment Team - Nuclear Engineering  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Definitions Definitions VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

438

Operations Authorization Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

439

Safety - Vulnerability Assessment Team - Nuclear Engineering Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safety Safety VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms Argonne's VAT (brochure)

440

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) | Open  

Open Energy Info (EERE)

Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Generalized Comprehensive Mitigation Assessment Process (GCOMAP) (Redirected from GCOMAP) Jump to: navigation, search Tool Summary Name: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Land Focus Area: Forestry Topics: GHG inventory, Pathways analysis Website: ies.lbl.gov/taxonomy/term/34 References: GCOMAP Project [1] Logo: Generalized Comprehensive Mitigation Assessment Process (GCOMAP) "The GCOMAP project reported on the global potential for carbon sequestration in forest plantations, and the reduction of carbon emissions from deforestation, in response to six carbon price scenarios from 2000 to 2100. These carbon price scenarios cover a range typically seen in global

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Independent Oversight Assessment, Idaho Cleanup Project Sodium...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This...

442

Independent Oversight Assessment, DOE Office of Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management...

443

Independent Oversight Assessment, Salt Waste Processing Facility...  

Broader source: Energy.gov (indexed) [DOE]

Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department of Energy...

444

OFFICE ERGONOMICS A Self-Assessment  

E-Print Network [OSTI]

OFFICE ERGONOMICS A Self-Assessment Guide Environmental Health and Safety Office safety, along with additional information on ergonomics, is also available through the Dalhousie Safety Office

Brownstone, Rob

445

EM Quality Assurance Assessment Schedule FY 2010  

Broader source: Energy.gov [DOE]

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

446

Colorado's Hydrothermal Resource Base - An Assessment | Open...  

Open Energy Info (EERE)

Hydrothermal Resource Base - An Assessment Author Richard Howard Pearl Published Colorado Geological Survey in Cooperation with the U.S. Department of Energy, 1979 Report...

447

Environment Pollution Risk Assessment In Ukraine  

Science Journals Connector (OSTI)

An excessive concentration of industrial facilities and automobile transport in Ukraine has led to an extremely high anthropogenic ... Environment pollution risk assessments for industrial regions of Ukraine have...

G. I. Rudko

2008-01-01T23:59:59.000Z

448

Microsoft Word - Fish Impact Assessment 070512.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

K Fish Habitat and Fish Population Impacts ASSESSMENT OF RELATIVE FISH HABITAT AND FISH POPULATION IMPACTS OF I-5 CORRIDOR REINFORCEMENT PROJECT ALTERNATIVES AND OPTIONS Report to:...

449

Floodplain Assessment and Statement of Findings  

Office of Energy Efficiency and Renewable Energy (EERE)

Floodplain Assessment and Statement of Findings for Installation of a Renewable Energy Anaerobic Digester Facility at the University of California, Davis in Yolo County, California.

450

Assessing Climate Change Impacts, Vulnerability and Adaptation...  

Open Energy Info (EERE)

The Case of Pantabangan-Carranglan Watershed Jump to: navigation, search Name Assessing Climate Change Impacts, Vulnerability and Adaptation: The Case of Pantabangan-Carranglan...

451

Weapons assessment efficiencies through use of nondestructive...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Weapons assessment efficiencies through use of nondestructive laser gas sampling Nondestructive laser welding process far less expensive, no underground testing. June 8, 2012...

452

Industrial Assessment Centers Help Students, Communities Learn...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

hands-on training in manufacturing plants. Assessments are performed by local teams of engineering faculty and students from 26 participating universities across the country,...

453

Fan System Assessment Tool Introduction - Webcast  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Plan Learn how others have saved Access the National Industrial Assessment Center (IAC) Database EERE Information Center On-call team of professional engineers, scientists,...

454

Gathering Data to Assess Your Watershed  

E-Print Network [OSTI]

Quality Data Recycling Programs Economic Development Census Data & Demographics Tax Records #12 and Wastewater Planning and Assessments Population Projections TNRIS Data from State Agencies Railroad Commission

455

Gathering Data to Assess Your Watershed  

E-Print Network [OSTI]

Environmental Depts. Water Quality Data Recycling Programs Economic Development Census Data & Demographics Tax Water and Wastewater Planning and Assessments Population Projections Railroad Commission (RRC) Oil

456

Tidal Energy Resource Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

dalresourcegtrchaas.ppt More Documents & Publications Ocean current resource assessment Free Flow Energy (TRL 1 2 3 Component) - Design and Development of a Cross-Platform...

457

Independent Oversight Assessment, Portsmouth/Paducah Project...  

Broader source: Energy.gov (indexed) [DOE]

Project Office - May 2012 May 2012 Assessment of the PortsmouthPaducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants...

458

Title Preliminary Assessment of Geothermal Potential Author  

National Nuclear Security Administration (NNSA)

NTSEIS ADMINISTRATIVE RECORD PRELIMINARY ASSESSMENT OF GEOTHERMAL POTENTIAL NEVADA TEST SITE j NYE COUNTY, NEVADA Prepared for: UNITED STATES DEPARTMENT OF ENERGY Prepared by:...

459

Organizational assessment processes for enterprise transformation  

E-Print Network [OSTI]

Enterprise transformation is a dynamic process that builds upon and affects organizational processes. Organizational assessment plays critical role in planning and execution of enterprise transformation. It allows the ...

Abdimomunova, Leyla (Leyla M.)

2010-01-01T23:59:59.000Z

460

Environmental Assessments (EA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1792-S1: Final Supplemental Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project - Castine Harbor Test...

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

On environmental lifecycle assessment for policy selection  

E-Print Network [OSTI]

Kammen. Ethanol can contribute to energy and environmentalgas emissions and energy balances in bio-ethanol productionof CO 2 /MJ of energy in corn ethanol. Similar assessments

Rajagopal, Deepak

2010-01-01T23:59:59.000Z

462

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

463

Sandia National Laboratories: Tidal Energy Resource Assessment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of current speed * temporal variation of power density * temporal variation of turbulence intensity * tidal energy resource assessment * Verdant Power Inc. Comments are closed....

464

Assessment of Inferred Geothermal Resource: Longavi Project,...  

Open Energy Info (EERE)

Project, Chile Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Assessment of Inferred Geothermal Resource: Longavi Project, Chile Organization Hot...

465

Industrial Assessment Center Awards: Recognizing Excellence in...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

elsewhere, conducting energy-efficiency assessments, as well as design reviews, for wastewater treatment, industrial, and commercial facilities. Distinguished Alumni - Adam Selvin...

466

Industrial Assessment Centers: AMO Technical Assistance Overview  

Broader source: Energy.gov (indexed) [DOE]

per center) of "non-traditional" assessments are allowed - with DOE approval (e.g., wastewater treatment, hospitalsinstitutions) - Plant normally located within 150 miles (242...

467

Functional cardiovascular assessment in congenital heart disease.  

E-Print Network [OSTI]

??abstractAdequate and serial functional cardiovascular assessment is important in patients with congenital heart disease because many show disruption of normal myocardial geometry, which may or (more)

W.J.B.W. van den Berg

2007-01-01T23:59:59.000Z

468

Idaho DEQ Environmental Assessment Information | Open Energy...  

Open Energy Info (EERE)

Information Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho DEQ Environmental Assessment Information Abstract This website provides an...

469

Los Alamos Needs Assessment | Department of Energy  

Energy Savers [EERE]

and concerns for the site. Los Alamos Needs Assessment More Documents & Publications Status Report, Department of Energy's Chronic Beryllium Disease Prevention Program - February...

470

Independent Oversight Assessment, Los Alamos National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

April 2012 Assessment of Nuclear Safety Culture at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project This report provides the results of an...

471

Bureau of Land Management's Environmental Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Management's Environmental Assessment - T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada Bureau...

472

Property-Assessed Clean Energy Programs  

Broader source: Energy.gov [DOE]

The property-assessed clean energy (PACE) model is an innovative mechanism for financing energy efficiency and renewable energy improvements on private property. PACE programs allow local...

473

EA-1535: Final Programmatic Environmental Assessment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2007) More Documents & Publications EA-1535: Finding of No Significant Impact EA-1037: Final Environmental Assessment EIS-0472: Draft Programmatic Environmental Impact Statement...

474

Assessing Energy Resources Webinar Presentation Slides | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Web Mapping and Online GIS Applications for Renewable Energy Solar Energy - Capturing and Using Power and Heat from the Sun Assessing Energy Resources Webinar Text Version...

475

BIOMEDICAL AND HEALTH Assessing the Environmental, Health  

E-Print Network [OSTI]

BIOMEDICAL AND HEALTH Assessing the Environmental, Health and Safety Impact of Nanoparticles- proaching the sensitivity limit for most instruments. #12;BIOMEDICAL AND HEALTH A colloidal nanoparticle

Magee, Joseph W.

476

The Risk Assessment Information System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Radionuclide Decay Chain Radionuclide Decay Chain Using the Radionuclide Decay Chain Tool Click on the steps below for detailed instructions about each page of the Radionuclide Chain Tool. 1. Select Isotope 2. Decay Chain Table 3. Decay Chain Animation 1. Select Isotope Select the isotope of interest and click the "Submit" button. 2. Decay Chain Table A table of the ICRP 107 decay chain appears that displays the parent and all daughters in the decay chain through the stable isotope(s). The half-life, decay modes, and the branching fractions are given. Decay chains that are repeated as a result of multiple branching fractions are only presented once in the table. Text below the decay chain table contains decay mode definitions and further information on the daughters included in the +D slope factors for risk assessment purposes. A back button is provided to return to the main page. To watch an animated representation of the decay process, click the link "Click for visual diagram."

477

Live Fire Range Environmental Assessment  

SciTech Connect (OSTI)

The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

None

1993-08-01T23:59:59.000Z

478

Fort Drum integrated resource assessment  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

479

Mobile munitions assessment system development  

SciTech Connect (OSTI)

The United States has been involved in the development, testing, storage and disposal of chemical weapons since World War I. As a result, there are numerous sites which contain the presence of chemical warfare materiel. This materiel is in the form of buried surplus munitions, munitions that did not detonate during testing and other forms. These items pose a significant human health and environmental hazard and must be disposed of properly. The US Army was tasked by the Department of Defense with the remediation of all non-stockpile chemical warfare materiel. To help comply with this tasking, the Army Project Manager for Nonstockpile Chemical Materiel is sponsoring the development of a Mobile Munitions Assessment System (MMAS). The system is being developed by the Idaho National Engineering Laboratory and Dugway Proving Ground. The purpose of the system is to inspect suspect munitions and containers, identify the fill, evaluate the fuzing and firing train and analyze samples from the surrounding area to determine if chemical warfare materiel is present. The information gained from the application of the MMAS and other systems is intended to be used to establish the best method to handle and dispose of a given munition and its contents.

Rowe, L.C. [Department of the Army, Aberdeen Proving Ground, MD (United States); Watts, K.D. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Jorgensen, C.L. [Dugway Proving Ground, UT (United States)

1996-05-01T23:59:59.000Z

480

Self-Assessment Program Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Broader source: Energy.gov (indexed) [DOE]

SELF-ASSESSMENT SELF-ASSESSMENT Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: Management should ensure that effective management and independent self- assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect people and

Note: This page contains sample records for the topic "assessment admiralty inlet" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Peer Assessment of Student Constructed Posters: Assessment Alternatives in Preservice Mathematics Education  

Science Journals Connector (OSTI)

In this article I discuss a four-year action research project that involved the development of effective assessment tools for preservice mathematics teachers. The focus of the article is on peer assessment in whi...

Robyn Zevenbergen

482

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network [OSTI]

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

483

Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station  

SciTech Connect (OSTI)

PNNL conducted a technical assessment of the NDE issues and protocols that led to missed detections of several axially oriented flaws in a steam generator primary inlet dissimilar metal weld at North Anna Power Station, Unit 1 (NAPS-1). This particular component design exhibits a significant outside-diameter (OD) taper that is not included as a blind performance demonstration mock-up within the industrys Performance Demonstration Initiative, administered by EPRI. For this reason, the licensee engaged EPRI to assist in the development of a technical justification to support the basis for a site-specific qualification. The service-induced flaws at NAPS-1 were eventually detected as a result of OD surface machining in preparation for a full structural weld overlay. The machining operation uncovered the existence of two through-wall flaws, based on the observance of primary water leaking from the dissimilar metal weld. A total of five axially oriented flaws were detected in varied locations around the weld circumference. The field volumetric examination that was conducted at NAPS-1 was a non-encoded, real-time manual ultrasonic examination. PNNL conducted both an initial assessment, and subsequently, a more rigorous technical evaluation (reported here), which has identified an array of NDE issues that may have led to the subject missed detections. These evaluations were performed through technical reviews and discussions with NRC staff, EPRI NDE Center personnel, industry and ISI vendor personnel, and ultrasonic transducer manufacturers, and laboratory tests, to better understand the underlying issues at North Anna.

Anderson, Michael T.; Diaz, Aaron A.; Cinson, Anthony D.; Crawford, Susan L.; Prowant, Matthew S.; Doctor, Steven R.

2014-03-24T23:59:59.000Z

484

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT  

Broader source: Energy.gov (indexed) [DOE]

ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT ATTACHMENT A - CHECKLIST FOR SELF ASSESSMENT Site: Federal or Contractor Program: Name: ____________________________________________ Title:______________________________________________ Organization:_______________________________________ Address: __________________________________________ Bldg and Room Number _____________________________ Phone Number __________________ E-Mail ________________________________ Years of Records Management experience? Length of time in current position? Training? __________________________________________________________________ Signature: Date: 02/03/2010 2 INSTITUTIONALIZATION

485

MSU Departmental Assessment Plan Department: Psychology  

E-Print Network [OSTI]

1 MSU Departmental Assessment Plan 2007-2009 Department: Psychology Department Head: Richard A.S. in Psychology with options in Psychological Science and Applied Psychology M.S. in Applied Psychology #12;2 Departmental Assessment Plan Department of Psychology, Montana State University April 2007 Degree Objectives

Maxwell, Bruce D.

486

MSU Departmental Assessment Plan Department: Psychology  

E-Print Network [OSTI]

1 MSU Departmental Assessment Plan Department: Psychology Department Chair: Richard A. Block/Majors/Options Offered by Department B.S. in Psychology (with options in Psychological Science and Applied Psychology) M.S. in Psychological Science #12;2 Departmental Assessment Plan Department of Psychology, Montana State University July

Maxwell, Bruce D.

487

Total Petroleum Systems and Assessment Units (AU)  

E-Print Network [OSTI]

Total Petroleum Systems (TPS) and Assessment Units (AU) Field type Surface water Groundwater X X X X X X X X AU 00000003 Oil/ Gas X X X X X X X X Total X X X X X X X Total Petroleum Systems (TPS) and Assessment Units (AU) Field type Total undiscovered petroleum (MMBO or BCFG) Water per oil

Torgersen, Christian

488

Integrated risk assessment for LNG terminals  

Science Journals Connector (OSTI)

Abstract This paper presents an integrated risk assessment framework for Liquefied Natural Gas (LNG) terminals. The basic steps for risk assessment are the following: a) hazard identification, b) accident sequence modeling, where logic models such as Event Trees and Fault Trees are developed c) data acquisition and parameter estimation, used to estimate frequencies of the initiating events, component unavailability and probabilities of human actions, d) accident sequence quantification, where all accident sequences are assessed, e) consequence assessment, where release, evaporation rate, radiation levels and overpressure owing to immediate or delayed ignition of LNG is performed and f) integration of results where risk indices are assessed. Risk assessment of an onshore and an offshore LNG terminal is performed, according to the basic methodological steps, and the distances where individual risk levels equal to 10?510?7/yr are assessed and presented in the form of individual contours. A section dedicated to I.A. Papazoglou, pioneer in Quantitative Risk Assessment both in the nuclear and chemical industry is also provided.

O.N. Aneziris; I.A. Papazoglou; M. Konstantinidou; Z. Nivolianitou

2014-01-01T23:59:59.000Z

489

Single Assessment Pass Rate South Carolina  

E-Print Network [OSTI]

Single Assessment Pass Rate South Carolina Academic Year 2000 - 2001 ETS Type of Assessment Test Code Total Pass % Pass Total Pass % Pass Academic Content Area Education in the Elementary School 0010., & Comp.: Essays 0042 Mathematics 0060 1 1 100% 47 45 96% Chemistry, Physics and General Science 0070 5 3

Kasman, Alex

490

Assessment Report, Department of Physics August, 2008  

E-Print Network [OSTI]

Assessment Report, Department of Physics August, 2008 1. Learning Goals A. Learning goals courses, a student should be able to: 1. Qualitatively describe the behavior of some natural world that which is attained by physics majors. 2. Assessment Methods The Physics Department's mission is threefold

Bogaerts, Steven

491

Medical Surveillance n Based on risk assessment  

E-Print Network [OSTI]

2.12 #12;Medical Surveillance Criteria n Based on risk assessment n Pre-placement n evaluate of numbers exists n Predict an outcome given similar events Medical Surveillance Risk Assessment 2.12 #12;n What is the natural host? n Does agent cross species barriers? n Wild-type agent or attenuated? n

Collins, Gary S.

492

Upper San Juan Basin Biological Assessment  

E-Print Network [OSTI]

the biological assessment. The Colorado Natural Heritage Program began its research by updating its BiologicalUpper San Juan Basin Biological Assessment Colorado State University 8002 Campus Delivery Fort Collins, CO 80523-8002 June 2003 Colorado Natural Heritage Program #12;Southwest Land Alliance Pagosa

493

Ethics Committee (COMETS) Ethics and expert assessments  

E-Print Network [OSTI]

Ethics Committee (COMETS) Ethics and expert assessments ajor topicExpert assessments are an area of the CNRS, the French National Centre for Scientific Research, made a formal request to the ethics committee programme on Ethics and Evaluation (see http://www2.cnrs.fr/band/254.htm), the COMETS began its study

van Tiggelen, Bart

494

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/  

E-Print Network [OSTI]

DRAFT for Secretarial Review ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ INITIAL REGULATORY Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis (EA/RIR/IRFA) evaluates FLEXIBILITY ANALYSIS For an Amendment to the Fishery Management Plan (FMP) for Groundfish of the Bering Sea

495

Dyke quality assessment by remote sensing  

E-Print Network [OSTI]

1 RSDYK Dyke quality assessment by remote sensing and geological information Robert Hack Flood Solutions for smart flood control 15 Oct 2009 2Reeuwijk - Hack #12;2 RSDYKRSDYK Quality assessment of dykes from remote sensing in combination with l i l k l dgeological knowledge 15 Oct 2009 3Reeuwijk - Hack

Hack, Robert

496

Co-SSponsored by: RISK ASSESSMENT  

E-Print Network [OSTI]

Co-SSponsored by: RADIATION RISK ASSESSMENT WWoorrkksshhoopp PPrroocceeeeddiinnggss November 5 - 7, 2001 Las Vegas, Nevada Japan Atomic Energy Research Institute U.S. Environmental Protection Agency #12 Noguchi, Jun Funabiki and Kimiaki Saito 118 Radiation Risk Assessment Workshop Proceedings i #12

497

Environmental Impact Assessment Biologist Biologist R24  

E-Print Network [OSTI]

in environmental impact monitoring and assessment related to point and non-point sources of water, land and air in Environmental Management Act Permits and Approvals, Environmental Assessment Act Project Approval Certificates makers by recommending effluent management and monitoring requirements for Environmental Management Act

Northern British Columbia, University of

498

MSU Departmental Assessment Update Spring 2007  

E-Print Network [OSTI]

received their undergraduate education elsewhere. The ACS tests in Organic, Inorganic, and Physical posters, one at the Undergraduate Scholars Conference, and one at the Departmental Poster Session held, but no formal assessment of the posters has been implemented yet. 3. Overall Assessment Department has started

Maxwell, Bruce D.

499

Life Cycle Assessment: Past, Present, and Future  

Science Journals Connector (OSTI)

Life cycle assessment (LCA) can develop into life cycle sustainability assessment (LCSA), which is a transdisciplinary integration framework of models rather than a model in itself. ... As the environmental burden from agriculture, and especially from livestock breeding, is known to be quite important, such an analysis was interesting for policy purposes. ...

Jeroen B. Guine; Reinout Heijungs; Gjalt Huppes; Alessandra Zamagni; Paolo Masoni; Roberto Buonamici; Tomas Ekvall; Tomas Rydberg

2010-09-02T23:59:59.000Z

500

Hydraulic Fracturing in Michigan Integrated Assessment  

E-Print Network [OSTI]

Hydraulic Fracturing in Michigan Integrated Assessment #12;Agenda · Welcome and introduction and timeline · Panel presentation and discussion · Facilitated Q & A · Closing remarks #12;Hydraulic Fracturing · Leverages resources IA BENEFITS Benefits of Integrated Assessment #12;Key Points: · Hydraulic Fracturing (HF

Kamat, Vineet R.