Powered by Deep Web Technologies
Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Los Alamos Tritium Systems Test Assembly the Los Alamos Tritium Systems Test Assembly Facility Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility The purpose of this document is to report the results of a survey conducted at the Los Alamos Tritium Systems Test Assembly (TSTA Facility). The survey was conducted during the week of 3/20/00. The primary purpose of the survey is to identify facility conditions and issues that need to be addressed to transfer responsibility for the facility from the Office of Science (SC) to the Office of Environmental Management (EM). The second purpose is to provide EM with insight regarding the facility's risks and liabilities, which may influence the management of eventual downstream life-cycle activities. The survey and this report are part of a process for implementing the

2

Assembly and installation of the large coil test facility test stand  

SciTech Connect

The Large Coil Test Facility (LCTF) was built to test six tokamak-type superconducting coils, with three to be designed and built by US industrial teams and three provided by Japan, Switzerland, and Euratom under an international agreement. The facility is designed to test these coils in an environment which simulates that of a tokamak. The heart of this facility is the test stand, which is made up of four major assemblies: the Gravity Base Assembly, the Bucking Post Assembly, the Torque Ring Assembly, and the Pulse Coil Assembly. This paper provides a detailed review of the assembly and installation of the test stand components and the handling and installation of the first coil into the test stand.

Queen, C.C. Jr.

1983-01-01T23:59:59.000Z

3

A facility to remotely assemble radioisotope thermoelectric generators  

DOE Green Energy (OSTI)

Radioisotope Thermoelectric Generators (RTGs) are electrical power sources that use heat from decaying radioisotopes to directly generate electrical power. The RTG assembly process is performed in an inert atmosphere inside a large glovebox, which is surrounded by radiation shielding to reduce exposure to neutron and gamma radiation from the radioisotope heat source. In the past, allowable dose rate limits have allowed direct, manual assembly methods; however, current dose rate limits require a thicker radiation shielding that makes direct, manual assembly infeasible. To minimize RTG assembly process modifications, telerobotic systems are being investigated to perform remote assembly tasks. Telerobotic systems duplicate human arm motion and incorporate force feedback sensitivity to handle objects and tools in a human-like manner. A telerobotic system with two arms and a three-dimensional (3-D) vision system can be used to perform remote RTG assembly tasks inside gloveboxes and cells using unmodified, normal hand tools.

Engstrom, J.W.; Goldmann, L.H.; Truitt, R.W.

1992-07-01T23:59:59.000Z

4

High Energy X-Ray System Specification for the Device Assembly Facility (DAF) at the NNSS  

SciTech Connect

This specification establishes requirements for an X-Ray System to be used at the Device Assembly Facility (DAF) at the Nevada National Security Site (NNSS) to support radiography of experimental assemblies for Laboratory (LANL, LLNL, SNL) programs conducting work at the NNSS.

Fry, David A. [Los Alamos National Laboratory

2012-08-10T23:59:59.000Z

5

REPORT OF SURVEY OF THE LOS ALAMOS TRITIUM SYSTEMS TEST ASSEMBLY FACILITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE LOS ALAMOS TRITIUM THE LOS ALAMOS TRITIUM SYSTEMS TEST ASSEMBLY FACILITY U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility Rev. E (Final) October 3, 2000 Contents 1. Introduction 1.1 Purpose 1.2 Facility Description 1.3 Organization Representatives 1.4 Survey Participants 2. Summary, Conclusions & Recommendations 2.1 Comparison With LCAM Requirements 2.2 Transfer Considerations 2.3 Post-Transfer EM Path Forward & Management Risk 2.4 Post-Transfer S&M Reduction via Administrative Contamination Limit Revision 2.5 Stable Metal Tritides Consideration During D&D 3. Survey Results

6

Radioactive isotope production for medical applications using Kharkov electron driven subcritical assembly facility.  

SciTech Connect

Kharkov Institute of Physics and Technology (KIPT) of Ukraine has a plan to construct an accelerator driven subcritical assembly. The main functions of the subcritical assembly are the medical isotope production, neutron thereby, and the support of the Ukraine nuclear industry. Reactor physics experiments and material research will be carried out using the capabilities of this facility. The United States of America and Ukraine have started collaboration activity for developing a conceptual design for this facility with low enrichment uranium (LEU) fuel. Different conceptual designs are being developed based on the facility mission and the engineering requirements including nuclear physics, neutronics, heat transfer, thermal hydraulics, structure, and material issues. Different fuel designs with LEU and reflector materials are considered in the design process. Safety, reliability, and environmental considerations are included in the facility conceptual design. The facility is configured to accommodate future design improvements and upgrades. This report is a part of the Argonne National Laboratory Activity within this collaboration for developing and characterizing the subcritical assembly conceptual design. In this study, the medical isotope production function of the Kharkov facility is defined. First, a review was carried out to identify the medical isotopes and its medical use. Then a preliminary assessment was performed without including the self-shielding effect of the irradiated samples. Finally, more detailed investigation was carried out including the self-shielding effect, which defined the sample size and irradiation location for producing each medical isotope. In the first part, the reaction rates were calculated as the multiplication of the cross section with the unperturbed neutron flux of the facility. Over fifty isotopes were considered and all transmutation channels are used including (n,{gamma}), (n,2n), (n,p), and ({gamma},n). In the second part, the parent isotopes with high reaction rate were explicitly modeled in the calculations. For the nuclides with a very high capture microscopic cross section, such as iridium, rhenium, and samarium, their specific activities are reduced by a factor of 30 when the self-shielding effect is included. Four irradiation locations were considered in the analyses to maximize the medical isotope production rate. The results show the self-shield effect reduces the specific activity values and changes the irradiation location for obtaining the maximum possible specific activity. The axial and radial distributions of the specific activity were used to define the irradiation sample size for producing each isotope.

Talamo, A.; Gohar, Y.; Nuclear Engineering Division

2007-05-15T23:59:59.000Z

7

1994 Baseline biological studies for the Device Assembly Facility at the Nevada Test Site  

SciTech Connect

This report describes environmental work performed at the Device Assembly Facility (DAF) in 1994 by the Basic Environmental Monitoring and Compliance Program (BECAMP). The DAF is located near the Mojave-Great Basin desert transition zone 27 km north of Mercury. The area immediately around the DAF building complex is a gentle slope cut by 1 to 3 m deep arroyos, and occupied by transitional vegetation. In 1994, construction activities were largely limited to work inside the perimeter fence. The DAF was still in a preoperational mode in 1994, and no nuclear materials were present. The DAF facilities were being occupied so there was water in the sewage settling pond, and the roads and lights were in use. Sampling activities in 1994 represent the first year in the proposed monitoring scheme. The proposed biological monitoring plan gives detailed experimental protocols. Plant, lizard, tortoise, small mammal, and bird surveys were performed in 1994. The authors briefly outline procedures employed in 1994. Studies performed on each taxon are reviewed separately then summarized in a concluding section.

Townsend, Y.E. [ed.; Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

1995-02-01T23:59:59.000Z

8

The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site  

SciTech Connect

This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

1995-02-01T23:59:59.000Z

9

The National Criticality Experiments Research Center at the Device Assembly Facility, Nevada National Security Site: Status and Capabilities, Summary Report  

SciTech Connect

The National Criticality Experiments Research Center (NCERC) was officially opened on August 29, 2011. Located within the Device Assembly Facility (DAF) at the Nevada National Security Site (NNSS), the NCERC has become a consolidation facility within the United States for critical configuration testing, particularly those involving highly enriched uranium (HEU). The DAF is a Department of Energy (DOE) owned facility that is operated by the National Nuclear Security Agency/Nevada Site Office (NNSA/NSO). User laboratories include the Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory (LANL). Personnel bring their home lab qualifications and procedures with them to the DAF, such that non-site specific training need not be repeated to conduct work at DAF. The NNSS Management and Operating contractor is National Security Technologies, LLC (NSTec) and the NNSS Safeguards and Security contractor is Wackenhut Services. The complete report provides an overview and status of the available laboratories and test bays at NCERC, available test materials and test support configurations, and test requirements and limitations for performing sub-critical and critical tests. The current summary provides a brief summary of the facility status and the method by which experiments may be introduced to NCERC.

S. Bragg-Sitton; J. Bess; J. Werner

2011-09-01T23:59:59.000Z

10

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment Feature Stories Public Reading Room: Environmental Documents, Reports LANL Home Phonebook Calendar Video About Operational Excellence Facilities Facilities...

11

Supplemental information for a notice of construction for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area  

Science Conference Proceedings (OSTI)

This ''Notice of Construction'' has been submitted by the US Department of Energy-Richland Operations Office (P.O. Box 550, Richland, Washington 99352), pursuant to WAC 402-80-070, for three new sources of radionuclide emissions at the Hanford Site in Washington State (Figure 1). The three new sources, the Fueled Clad Fabrication System (FCFS) the Radioisotope Power Systems Facility (RPSF) and the Fuel Assembly Area (FAA) will be located in one facility, the Fuels and materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post- irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies to be used in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, to the extent possible, these systems will be dealt with separately. The FAA is a comparatively independent operation though it will share the FMEF complex.

Not Available

1989-08-01T23:59:59.000Z

12

Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area  

SciTech Connect

This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

Not Available

1989-08-01T23:59:59.000Z

13

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

14

Public Assembly Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Assembly Assembly Characteristics by Activity... Public Assembly Public assembly buildings are those in which people gather for social or recreational activities, whether in private or non-private meeting halls. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Public Assembly Buildings... Most public assembly buildings were not large convention centers or entertainment arenas; about two-fifths fell into the smallest size category. About one-fifth of public assembly buildings were government-owned, mostly by local governments; examples of these types of public assembly buildings are libraries and community recreational facilities. Tables: Buildings and Size Data by Basic Characteristics Establishment, Employment, and Age Data by Characteristics

15

Preliminary plans to move the special nuclear material supporting category I and II missions from TA-18 to the device assembly facility  

SciTech Connect

In December 2002, the National Nuclear Security Agency (NNSA) issued a Record of Decision announcing its intent to relocate safeguards Category I and II missions and associated special nuclear materials (SNM) from Los Alamos National Laboratory (LANL) Technical Area 18 (TA-18) to the Device Assembly Facility (DAF) at the Nevada Test Site (NTS). The Cat I and II missions support nuclear criticality safety, nuclear emergency response, nuclear nonproliferation, and homeland security. TA-18 is the sole remaining facility in the United States with the capability to perform general-purpose nuclear materials handling experiments and training. Hands-on and remote control experiments, measurements, and training with special materials and devices are conducted. The conceptual design for modifying the DAF to house these Cat I and II missions includes plans for packaging and transporting the SNM inventory associated with the missions. This paper discusses these preliminary packaging and transporting plans, including how they fit into the plans for transitioning the relevant TA- 18 missions to DAF while ensuring that mission, cost, and schedule requirements are met.

Haag, William Earl; Nicholas, N. J. (Nancy J.); Mann, P. (Paul)

2004-01-01T23:59:59.000Z

16

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2012 [Facility News] 6, 2012 [Facility News] News Tips from 2012 EGU General Assembly Bookmark and Share The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. VIENNA - The U.S. Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility is the world's most comprehensive outdoor laboratory and data archive for research related to atmospheric processes that affect Earth's climate. At the European Geophysical Union (EGU) General Assembly 2012 in Vienna, find out how scientists use the ARM Facility to study the interactions between clouds,

17

Authorized Limits for the Release of a 25 Ton Locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly Facility, Nevada Test Site, Nevada  

SciTech Connect

This document contains process knowledge and radiological data and analysis to support approval for release of the 25-ton locomotive, Serial Number 21547, at the Area 25 Engine Maintenance, Assembly, and Disassembly (EMAD) Facility, located on the Nevada Test Site (NTS). The 25-ton locomotive is a small, one-of-a-kind locomotive used to move railcars in support of the Nuclear Engine for Rocket Vehicle Application project. This locomotive was identified as having significant historical value by the Nevada State Railroad Museum in Boulder City, Nevada, where it will be used as a display piece. A substantial effort to characterize the radiological conditions of the locomotive was undertaken by the NTS Management and Operations Contractor, National Security Technologies, LLC (NSTec). During this characterization process, seven small areas on the locomotive had contamination levels that exceeded the NTS release criteria (limits consistent with U.S. Department of Energy [DOE] Order DOE O 5400.5, Radiation Protection of the Public and the Environment). The decision was made to perform radiological decontamination of these known accessible impacted areas to further the release process. On February 9, 2010, NSTec personnel completed decontamination of these seven areas to within the NTS release criteria. Although all accessible areas of the locomotive had been successfully decontaminated to within NTS release criteria, it was plausible that inaccessible areas of the locomotive (i.e., those areas on the locomotive where it was not possible to perform radiological surveys) could potentially have contamination above unrestricted release limits. To access the majority of these inaccessible areas, the locomotive would have to be disassembled. A complete disassembly for a full radiological survey could have permanently destroyed parts and would have ruined the historical value of the locomotive. Complete disassembly would also add an unreasonable financial burden for the contractor. A decision was reached between the NTS regulator and NSTec, opting for alternative authorized limits from DOE Headquarters. In doing so, NSTec personnel performed a dose model using the DOE-approved modeling code RESRAD-BUILD v3.5 to evaluate scenarios. The parameters used in the dose model were conservative. NSTecs Radiological Engineering Calculation, REC-2010-001, Public Dose Estimate from the EMAD 25 Ton Locomotive, concluded that the four scenarios evaluated were below the 25-millirem per year limit, the likely dose scenarios met the few millirem in a year criteria, and that the EMAD 25-ton locomotive met the radiological requirements to be released with residual radioactivity to the public.

Jeremy Gwin and Douglas Frenette

2010-04-08T23:59:59.000Z

18

DOI: 10.1002/ejic.200701306 Facile Gram-Scale Growth of Single-Crystalline Nanotetrapod-Assembled ZnO  

E-Print Network (OSTI)

combustion and catalyst-free method, pure single-crystalline nanotetrapod-assembled bulk nano-ZnO was grown, Duke University, Durham, North Carolina 27708, USA [d] U.S. Army Aviation & Missile Research

Liu, Jie

19

Status of the National Ignition Facility Project, IG-0598 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

conventional facility; laser system; target experimental system; integrated computers and controls; assembly, installation, and refurbishment equipment; and utilities. To...

20

LANL | Partnering | User Facility - Los Alamos National Lab ...  

explosives loading and assembling facility; laser velocity interferometry; electronic and mechanical streak and framing cameras; ... beamcode laser special profiles;

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

The Archimedes 2 mechanical assembly planning system  

SciTech Connect

We describe the implementation and performance of Archimedes 2, an integrated mechanical assembly planning system. Archimedes 2 includes two planners, two assembly sequence animation facilities, and an associated robotic workcell. Both planners use full 3 dimensional data. A rudimentary translator from high level assembly plans to control code for the robotic workcell has also been implemented. We can translate data from a commercial CAD system into input data for the system, which has allowed us to plan assembly sequences for many industrial assemblies. Archimedes 2 has been used to plan sequences for assemblies consisting of 5 to 109 parts. We have also successfully taken a CAD model of an assembly, produced an optimized assembly sequence for it, and translated the plan into robot code, which successfully assembles the device specified in the model.

Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

1996-03-01T23:59:59.000Z

22

Latch assembly  

DOE Patents (OSTI)

A latch assembly for releasably securing an article in the form of a canister within a container housing. The assembly includes a cam pivotally mounted on the housing wall and biased into the housing interior. The cam is urged into a disabled position by the canister as it enters the housing and a latch release plate maintains the cam disabled when the canister is properly seated in the housing. Upon displacement of the release plate, the cam snaps into latching engagement against the canister for securing the same within the housing.

Frederickson, James R. (Richland, WA); Harper, William H. (Richland, WA); Perez, Raymond (Lynnwood, WA)

1986-01-01T23:59:59.000Z

23

Latch assembly  

DOE Patents (OSTI)

A latch assembly for releasably securing an article in the form of a canister within a container housing. The assembly includes a cam pivotally mounted on the housing wall and biased into the housing interior. The cam is urged into a disabled position by the canister as it enters the housing and a latch release plate maintains the cam disabled when the canister is properly seated in the housing. Upon displacement of the release plate, the cam snaps into latching engagement against the canister for securing the same within the housing. 2 figs.

Frederickson, J.R.; Harper, W.H.; Perez, R.

1984-08-17T23:59:59.000Z

24

Furnace assembly  

DOE Patents (OSTI)

A method of and apparatus for heating test specimens to desired elevated temperatures for irradiation by a high energy neutron source. A furnace assembly is provided for heating two separate groups of specimens to substantially different, elevated, isothermal temperatures in a high vacuum environment while positioning the two specimen groups symmetrically at equivalent neutron irradiating positions.

Panayotou, Nicholas F. (Kennewick, WA); Green, Donald R. (Richland, WA); Price, Larry S. (Pittsburg, CA)

1985-01-01T23:59:59.000Z

25

Dump assembly  

DOE Patents (OSTI)

A dump assembly having a fixed conduit and a rotatable conduit provided with overlapping plates, respectively, at their adjacent ends. The plates are formed with openings, respectively, normally offset from each other to block flow. The other end of the rotatable conduit is provided with means for securing the open end of a filled container thereto. Rotation of the rotatable conduit raises and inverts the container to empty the contents while concurrently aligning the conduit openings to permit flow of material therethrough.

Goldmann, Louis H. (Benton City, WA)

1986-01-01T23:59:59.000Z

26

Seal assembly  

DOE Patents (OSTI)

A seal assembly comprises a tube rotatable about its longitudinal axis and having two longitudinally spaced flanges projecting radially outwardly from the outer surface thereof. Slidably positioned against one of the flanges is a seal ring, and disposed between this seal ring and the other flange are two rings that are forced apart by springs, one of the latter rings being attached to a flexible wall.

Morgan, J.G.; Rennich, M.J.; Whatley, M.E.

1981-03-13T23:59:59.000Z

27

Pushrod assembly  

DOE Patents (OSTI)

A pushrod assembly including a carriage mounted on a shaft for movement therealong and carrying a pushrod engageable with a load to be moved. A magnet is mounted on a supporting bracket for movement along such shaft. Means are provided for adjustably spacing said magnet away from said carriage to obtain a selected magnetic attractive or coupling force therebetween. Movement of the supporting bracket and the magnet carried thereby pulls the carriage along with it until the selected magnetic force is exceeded by a resistance load acting on the carriage.

Potter, Jerry D. (Kennewick, WA)

1987-01-01T23:59:59.000Z

28

Dump assembly  

DOE Patents (OSTI)

This is a claim for a dump assembly having a fixed conduit and a rotatable conduit provided with overlapping plates, respectively, at their adjacent ends. The plates are formed with openings, respectively, normally offset from each other to block flow. The other end of the rotatable conduit is provided with means for securing the open end of a filled container thereto. Rotation of the rotatable conduit raises and inverts the container to empty the contents while concurrently aligning the conduit openings to permit flow of material therethrough. 4 figs.

Goldmann, L.H.

1984-12-06T23:59:59.000Z

29

Pushrod assembly  

DOE Patents (OSTI)

A pushrod assembly including a carriage mounted on a shaft for movement therealong and carrying a pushrod engageable with a load to be moved is described. A magnet is mounted on a supporting bracket for movement along such shaft. Means are provided for adjustably spacing magnet away from the carriage to obtain a selected magnetic attractive or coupling force therebetween. Movement of the supporting bracket and the magnet carried thereby pulls the carriage along with it until the selected magnetic force is exceeded by a resistance load acting on the carriage.

Potter, J.D.

1984-03-30T23:59:59.000Z

30

Nuclear Facilities Production Facilities  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration under contract DE-AC04-94AL85000. Sand 2011-4582P. ENERGY U.S. DEPARTMENT OF Gamma Irradiation Facility (GIF) The GIF provides test cells for...

31

Thermocouple assembly  

DOE Patents (OSTI)

A thermocouple assembly includes a thermocouple; a plurality of lead wires extending from the thermocouple; an insulating jacket extending along and enclosing the plurality of leads; and at least one internally sealed area within the insulating jacket to prevent fluid leakage along and within the insulating jacket. The invention also provides a method of preventing leakage of a fluid along and through an insulating jacket of a thermocouple including the steps of a) attaching a plurality of lead wires to a thermocouple; b) adding a heat sensitive pseudo-wire to extend along the plurality of lead wires; c) enclosing the lead wires and pseudo-wire inside an insulating jacket; d) locally heating axially spaced portions of the insulating jacket to a temperature which melts the pseudo-wire and fuses it with an interior surface of the jacket.

Thermos, Anthony Constantine (Greer, SC); Rahal, Fadi Elias (Easley, SC)

2002-01-01T23:59:59.000Z

32

RETORT ASSEMBLY  

DOE Patents (OSTI)

An improved retort assembly useful in the thermal reduction of volatilizable metals such as magnesium and calcium is described. In this process a high vacuum is maintained in the retort, however the retort must be heated to very high temperatures while at the same time the unloading end must bo cooled to condense the metal vapors, therefore the retention of the vacuum is frequently difficult due to the thermal stresses involved. This apparatus provides an extended condenser sleeve enclosed by the retort cover which forms the vacuum seal. Therefore, the seal is cooled by the fluid in the condenser sleeve and the extreme thermal stresses found in previous designs together with the deterioration of the sealing gasket caused by the high temperatures are avoided.

Loomis, C.C.; Ash, W.J.

1957-11-26T23:59:59.000Z

33

APS X-ray Optics Fabrication and Characterization Facility  

SciTech Connect

The APS is in the process of assembling an X-ray Optics Fabrication and characterization Facility. This report will describe its current (as of February 1993) design.

Davey, S.

1993-02-01T23:59:59.000Z

34

Self assembling magnetic tiles  

E-Print Network (OSTI)

Self assembly is an emerging technology in the field of manufacturing. Inspired by nature's ability to self assembly proteins from amino acids, this thesis attempts to demonstrate self assembly on the macro-scale. The ...

Rabl, Jessica A. (Jessica Ann)

2006-01-01T23:59:59.000Z

35

Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly under  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assembly Shaker Test for Determining Loads on a PWR Assembly Assembly Shaker Test for Determining Loads on a PWR Assembly under Surrogate Normal Conditions of Truck Transport R0.1 Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly under Surrogate Normal Conditions of Truck Transport R0.1 The United States current approach of long-term storage at its nuclear power plants and independent spent fuel storage installation, and deferred transportation of used nuclear fuel (UNF), along with the trend of nuclear power plants using reactor fuel for a longer time, creates questions concerning the ability of this aged, high-burnup fuel to withstand stresses and strains seen during normal conditions of transport from its current location to a future consolidated storage facility or permanent repository. UNFD R&D conducted testing employing surrogate instrumented

36

ARM - ARM Facility at EGU 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterARM Facility at EGU 2012 CenterARM Facility at EGU 2012 Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance ARM Facility at EGU 2012 At the 2012 European Geophysical Union General Assembly in Vienna, the ARM Climate Research Facility is hosting a booth located near the escalators in the Exhibition Entrance Hall. In their first time attending the assembly,

37

Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

FLEX lab image, windows testing lab, scientist inside a lab, Research Facilities EETD maintains advanced research and test facilities for buildings, energy technologies, air...

38

Reactor Core Assembly - HFIR Technical Parameters | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home › Facilities › HFIR › Reactor Core Assembly Home › Facilities › HFIR › Reactor Core Assembly Reactor Core Assembly The reactor core assembly is contained in an 8-ft (2.44-m)-diameter pressure vessel located in a pool of water. The top of the pressure vessel is 17 ft (5.18 m) below the pool surface, and the reactor horizontal mid-plane is 27.5 ft (8.38 m) below the pool surface. The control plate drive mechanisms are located in a subpile room beneath the pressure vessel. These features provide the necessary shielding for working above the reactor core and greatly facilitate access to the pressure vessel, core, and reflector regions. In-core irradiation and experiment locations (cross section at horizontal midplane) Reactor core assembly Reactor core assembly: (1) in-core irradiation and experiment locations,

39

Inlet nozzle assembly  

DOE Patents (OSTI)

An inlet nozzle assembly for directing coolant into the duct tube of a fuel assembly attached thereto. The nozzle assembly includes a shell for housing separable components including an orifice plate assembly, a neutron shield block, a neutron shield plug, and a diffuser block. The orifice plate assembly includes a plurality of stacked plates of differently configurated and sized openings for directing coolant therethrough in a predesigned flow pattern.

Christiansen, D.W.; Karnesky, R.A.; Knight, R.C.; Precechtel, D.R.; Smith, B.G.

1985-09-09T23:59:59.000Z

40

Inlet nozzle assembly  

DOE Patents (OSTI)

An inlet nozzle assembly for directing coolant into the duct tube of a fuel assembly attached thereto. The nozzle assembly includes a shell for housing separable components including an orifice plate assembly, a neutron shield block, a neutron shield plug, and a diffuser block. The orifice plate assembly includes a plurality of stacked plates of differently configurated and sized openings for directing coolant therethrough in a predesigned flow pattern.

Christiansen, David W. (Kennewick, WA); Karnesky, Richard A. (Richland, WA); Precechtel, Donald R. (Richland, WA); Smith, Bob G. (Richland, WA); Knight, Ronald C. (Richland, WA)

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Assembling and Installing LRUs for NIF  

SciTech Connect

Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

Bonanno, R E

2003-12-31T23:59:59.000Z

42

Facility Microgrids  

Science Conference Proceedings (OSTI)

Microgrids are receiving a considerable interest from the power industry, partly because their business and technical structure shows promise as a means of taking full advantage of distributed generation. This report investigates three issues associated with facility microgrids: (1) Multiple-distributed generation facility microgrids' unintentional islanding protection, (2) Facility microgrids' response to bulk grid disturbances, and (3) Facility microgrids' intentional islanding.

Ye, Z.; Walling, R.; Miller, N.; Du, P.; Nelson, K.

2005-05-01T23:59:59.000Z

43

High Field Magnetic Resonance Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

HFMRF Overview HFMRF Overview Section 2-3-1 High Field Magnetic Resonance Facility The High Field Magnetic Resonance Facility (HFMRF) focuses a significant portion of its research on developing a fundamental, molecular-level understanding of biochemical and biological systems and their response to environmental effects. A secondary focus is materials science, including catalysis and chemical mechanisms and processes. Staff and science consultants within this facility offer expertise in the areas of structural biology, solid-state materials characterization, and magnetic resonance imaging (MRI) techniques. Research activities in the HFMRF include: * structure determination of large molecular assemblies such as protein-DNA (normal and damaged DNA) and protein-RNA complexes

44

Membrane module assembly  

DOE Patents (OSTI)

A membrane module assembly is described which is adapted to provide a flow path for the incoming feed stream that forces it into prolonged heat-exchanging contact with a heating or cooling mechanism. Membrane separation processes employing the module assembly are also disclosed. The assembly is particularly useful for gas separation or pervaporation. 2 figures.

Kaschemekat, J.

1994-03-15T23:59:59.000Z

45

Application: Facilities  

Science Conference Proceedings (OSTI)

... Option.. Papavergos, PG; 1991. Halon 1301 Use in Oil and Gas Production Facilities: Alaska's North Slope.. Ulmer, PE; 1991. ...

2011-12-22T23:59:59.000Z

46

Sensor mount assemblies and sensor assemblies  

DOE Patents (OSTI)

Sensor mount assemblies and sensor assemblies are provided. In an embodiment, by way of example only, a sensor mount assembly includes a busbar, a main body, a backing surface, and a first finger. The busbar has a first end and a second end. The main body is overmolded onto the busbar. The backing surface extends radially outwardly relative to the main body. The first finger extends axially from the backing surface, and the first finger has a first end, a second end, and a tooth. The first end of the first finger is disposed on the backing surface, and the tooth is formed on the second end of the first finger.

Miller, David H. (Redondo Beach, CA)

2012-04-10T23:59:59.000Z

47

Assembly flow simulation of a radar  

Science Conference Proceedings (OSTI)

A discrete event simulation model has been developed to predict the assembly flow time of a new radar product. The simulation was the key tool employed to identify flow constraints. The radar, production facility, and equipment complement were designed, arranged, and selected to provide the most manufacturable assembly possible. A goal was to reduce the assembly and testing cycle time from twenty-six weeks to six weeks. A computer software simulation package (SLAM II) was utilized as the foundation a for simulating the assembly flow time. FORTRAN subroutines were incorporated into the software to deal with unique flow circumstances that were not accommodated by the software. Detailed information relating to the assembly operations was provided by a team selected from the engineering, manufacturing management, inspection, and production assembly staff. The simulation verified that it would be possible to achieve the cycle time goal of six weeks. Equipment and manpower constraints were identified during the simulation process and adjusted as required to achieve the flow with a given monthly production requirement. The simulation is being maintained as a planning tool to be used to identify constraints in the event that monthly output is increased. ``What-if`` studies have been conducted to identify the cost of reducing constraints caused by increases in output requirement.

Rutherford, W.C.; Biggs, P.M.

1993-10-01T23:59:59.000Z

48

User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Lawrence Berkeley National Laboratory's National User Facilities are available for cooperative research with institutions and the private sector worldwide. The Environmental...

49

Public Assembly Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

buildings. Since they comprised 7 percent of commercial floorspace, this means that their energy intensity was just slightly below the commercial average. Public assembly buildings...

50

Mobile Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Facility AMF Information Science Architecture Baseline Instruments AMF1 AMF2 AMF3 Data Operations AMF Fact Sheet Images Contacts AMF Deployments Hyytiälä, Finland, 2014 Manacapuru, Brazil, 2014 Oliktok Point, Alaska, 2013 Los Angeles, California, to Honolulu, Hawaii, 2012 Cape Cod, Massachusetts, 2012 Gan Island, Maldives, 2011 Ganges Valley, India, 2011 Steamboat Springs, Colorado, 2010 Graciosa Island, Azores, 2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 Mobile Facilities Pictured here in Gan, the second mobile facility is configured in a standard layout. Pictured here in Gan, the second mobile facility is configured in a standard layout. To explore science questions beyond those addressed by ARM's fixed sites at

51

Turbine disc sealing assembly  

SciTech Connect

A disc seal assembly for use in a turbine engine. The disc seal assembly includes a plurality of outwardly extending sealing flange members that define a plurality of fluid pockets. The sealing flange members define a labyrinth flow path therebetween to limit leakage between a hot gas path and a disc cavity in the turbine engine.

Diakunchak, Ihor S.

2013-03-05T23:59:59.000Z

52

Superconductive radiofrequency window assembly  

DOE Patents (OSTI)

The present invention is a superconducting radiofrequency window assembly for use in an electron beam accelerator. The SRF window assembly has a superconducting metal-ceramic design. The SRF window assembly comprises a superconducting frame, a ceramic plate having a superconducting metallized area, and a superconducting eyelet for sealing plate into frame. The plate is brazed to eyelet which is then electron beam welded to frame. A method for providing a ceramic object mounted in a metal member to withstand cryogenic temperatures is also provided. The method involves a new metallization process for coating a selected area of a ceramic object with a thin film of a superconducting material. Finally, a method for assembling an electron beam accelerator cavity utilizing the SRF window assembly is provided. The procedure is carried out within an ultra clean room to minimize exposure to particulates which adversely affect the performance of the cavity within the electron beam accelerator. 11 figs.

Phillips, H.L.; Elliott, T.S.

1998-05-19T23:59:59.000Z

53

Superconducting radiofrequency window assembly  

DOE Patents (OSTI)

The present invention is a superconducting radiofrequency window assembly for use in an electron beam accelerator. The srf window assembly has a superconducting metal-ceramic design. The srf window assembly comprises a superconducting frame, a ceramic plate having a superconducting metallized area, and a superconducting eyelet for sealing plate into frame. The plate is brazed to eyelet which is then electron beam welded to frame. A method for providing a ceramic object mounted in a metal member to withstand cryogenic temperatures is also provided. The method involves a new metallization process for coating a selected area of a ceramic object with a thin film of a superconducting material. Finally, a method for assembling an electron beam accelerator cavity utilizing the srf window assembly is provided. The procedure is carried out within an ultra clean room to minimize exposure to particulates which adversely affect the performance of the cavity within the electron beam accelerator. 11 figs.

Phillips, H.L.; Elliott, T.S.

1997-03-11T23:59:59.000Z

54

MOX Lead Assembly Fabrication at the Savannah River Site  

SciTech Connect

The U. S. Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) on the disposition of the nations weapon-usable surplus plutonium.This EIS is tiered from the Storage and Disposition of Weapons-Usable Fissile Material Programmatic Environmental Impact Statement issued in December 1996,and the associated Record of Decision issued on January, 1997. The EIS will examine reasonable alternatives and potential environmental impacts for the proposed siting, construction, and operation of three types of facilities for plutonium disposition. The three types of facilities are: a pit disassembly and conversion facility, a facility to immobilize surplus plutonium in a glass or ceramic form for disposition, and a facility to fabricate plutonium oxide into mixed oxide (MOX) fuel.As an integral part of the surplus plutonium program, Oak Ridge National Laboratory (ORNL) was tasked by the DOE Office of Fissile Material Disposition(MD) as the technical lead to organize and evaluate existing facilities in the DOE complex which may meet MD`s need for a domestic MOX fuel fabrication demonstration facility. The Lead Assembly (LA) facility is to produce 1 MT of usable test fuel per year for three years. The Savannah River Site (SRS) as the only operating plutonium processing site in the DOE complex, proposes two options to carry out the fabrication of MOX fuel lead test assemblies: an all Category I facility option and a combined Category I and non-Category I facilities option.

Geddes, R.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Spiker, D.L.; Poon, A.P.

1997-12-01T23:59:59.000Z

55

Automated Assembly Using Feature Localization  

E-Print Network (OSTI)

Automated assembly of mechanical devices is studies by researching methods of operating assembly equipment in a variable manner; that is, systems which may be configured to perform many different assembly operations ...

Gordon, Steven Jeffrey

1986-12-01T23:59:59.000Z

56

DC source assemblies  

SciTech Connect

Embodiments of DC source assemblies of power inverter systems of the type suitable for deployment in a vehicle having an electrically grounded chassis are provided. An embodiment of a DC source assembly comprises a housing, a DC source disposed within the housing, a first terminal, and a second terminal. The DC source also comprises a first capacitor having a first electrode electrically coupled to the housing, and a second electrode electrically coupled to the first terminal. The DC source assembly further comprises a second capacitor having a first electrode electrically coupled to the housing, and a second electrode electrically coupled to the second terminal.

Campbell, Jeremy B; Newson, Steve

2013-02-26T23:59:59.000Z

57

TOB Module Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

SiTracker Home Page Participating Institutions and Principal Contacts Useful Links Notes Images TOB Module Assembly and Testing Project TOB Integration Data Tracker Offline DQM LHC Fluence Calculator Total US Modules Tested Graph Total US Modules Tested Graph Total US Modules Tested Total US Modules Tested US Modules Tested Graph US Modules Tested Graph US Modules Tested US Modules Tested Rod Assembly TOB Modules on a Rod TOB Rod Insertion Installation of a TOB Rod Completed TOB Completed Tracker Outer Barrel TOB Module Assembly and Testing Project All 5208 modules of the CMS Tracker Outer Barrel were assembled and tested at two production sites in the US: the Fermi National Accelerator Laboratory and the University of California at Santa Barbara. The modules were delivered to CERN in the form of rods, with the last shipment taking

58

Steam separator latch assembly  

SciTech Connect

A latch assembly removably joins a steam separator assembly to a support flange disposed at a top end of a tubular shroud in a nuclear reactor pressure vessel. The assembly includes an annular head having a central portion for supporting the steam separator assembly thereon, and an annular head flange extending around a perimeter thereof for supporting the head to the support flange. A plurality of latches are circumferentially spaced apart around the head flange with each latch having a top end, a latch hook at a bottom end thereof, and a pivot support disposed at an intermediate portion therebetween and pivotally joined to the head flange. The latches are pivoted about the pivot supports for selectively engaging and disengaging the latch hooks with the support flange for fixedly joining the head to the shroud or for allowing removal thereof.

Challberg, Roy C. (Livermore, CA); Kobsa, Irvin R. (San Jose, CA)

1994-01-01T23:59:59.000Z

59

Steam separator latch assembly  

DOE Patents (OSTI)

A latch assembly removably joins a steam separator assembly to a support flange disposed at a top end of a tubular shroud in a nuclear reactor pressure vessel. The assembly includes an annular head having a central portion for supporting the steam separator assembly thereon, and an annular head flange extending around a perimeter thereof for supporting the head to the support flange. A plurality of latches are circumferentially spaced apart around the head flange with each latch having a top end, a latch hook at a bottom end thereof, and a pivot support disposed at an intermediate portion therebetween and pivotally joined to the head flange. The latches are pivoted about the pivot supports for selectively engaging and disengaging the latch hooks with the support flange for fixedly joining the head to the shroud or for allowing removal thereof. 12 figures.

Challberg, R.C.; Kobsa, I.R.

1994-02-01T23:59:59.000Z

60

Silicon solar cell assembly  

DOE Patents (OSTI)

A silicon solar cell assembly comprising a large, thin silicon solar cell bonded to a metal mount for use when there exists a mismatch in the thermal expansivities of the device and the mount.

Burgess, Edward L. (Albuquerque, NM); Nasby, Robert D. (Albuquerque, NM); Schueler, Donald G. (Albuquerque, NM)

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

High speed door assembly  

DOE Patents (OSTI)

This invention is comprised of a high speed door assembly, comprising an actuator cylinder and piston rods, a pressure supply cylinder and fittings, an electrically detonated explosive bolt, a honeycomb structured door, a honeycomb structured decelerator, and a structural steel frame encasing the assembly to close over a 3 foot diameter opening within 50 milliseconds of actuation, to contain hazardous materials and vapors within a test fixture.

Shapiro, C.

1991-12-31T23:59:59.000Z

62

Recuperator assembly and procedures  

DOE Patents (OSTI)

A construction of recuperator core segments is provided which insures proper assembly of the components of the recuperator core segment, and of a plurality of recuperator core segments. Each recuperator core segment must be constructed so as to prevent nesting of fin folds of the adjacent heat exchanger foils of the recuperator core segment. A plurality of recuperator core segments must be assembled together so as to prevent nesting of adjacent fin folds of adjacent recuperator core segments.

Kang, Yungmo (La Canada Flintridge, CA); McKeirnan, Jr., Robert D. (Westlake Village, CA)

2008-08-26T23:59:59.000Z

63

Intake research facilities manual. Final report  

Science Conference Proceedings (OSTI)

The objective of the project was to assemble descriptive information on testing facilities that could be used for future investigations of technologies designed to reduce losses of aquatic organisms at cooling water intakes. The manual is intended for use by utilities and their contractors to determine when existing test facilities can be utilized for future research. A list of 34 facilities was developed, and descriptive information on the environment, physical layout, and capabilities of each facility was collected for presentation on standardized sheets. Reference lists of the facilities, sorted into groups based on waterbody type, geographic location, intake type, available fish species, and intake technology, are presented to facilitate identification of groups of facilities with similar characteristics. The reference lists and descriptive information will allow efficient preliminary site evaluation by utilities interested in future intake technology research. 11 refs., 66 figs., 8 tabs.

McGroddy, P.M.; Pease, T.E.; Matousek, J.A.; Edson, R.B.

1985-05-01T23:59:59.000Z

64

Implementation of RFID in a low volume high flexibility assembly plant : item-level tagging  

E-Print Network (OSTI)

The implementation of an RFID checkpoint system in a low volume high flexibility assembly plant, aimed at tracking the flow of parts within the facility, was studied. A pilot revealed the suitability of the technology to ...

Koniski, Cyril (Cyril A.)

2010-01-01T23:59:59.000Z

65

Superconducting radiofrequency window assembly  

DOE Patents (OSTI)

The present invention is a superconducting radiofrequency window assembly for use in an electron beam accelerator. The srf window assembly (20) has a superconducting metal-ceramic design. The srf window assembly (20) comprises a superconducting frame (30), a ceramic plate (40) having a superconducting metallized area, and a superconducting eyelet (50) for sealing plate (40) into frame (30). The plate (40) is brazed to eyelet (50) which is then electron beam welded to frame (30). A method for providing a ceramic object mounted in a metal member to withstand cryogenic temperatures is also provided. The method involves a new metallization process for coating a selected area of a ceramic object with a thin film of a superconducting material. Finally, a method for assembling an electron beam accelerator cavity utilizing the srf window assembly is provided. The procedure is carried out within an ultra clean room to minimize exposure to particulates which adversely affect the performance of the cavity within the electron beam accelerator.

Phillips, Harry L. (Seaford, VA); Elliott, Thomas S. (Yorktown, VA)

1997-01-01T23:59:59.000Z

66

Superconductive radiofrequency window assembly  

DOE Patents (OSTI)

The present invention is a superconducting radiofrequency window assembly for use in an electron beam accelerator. The srf window assembly (20) has a superconducting metal-ceramic design. The srf window assembly (20) comprises a superconducting frame (30), a ceramic plate (40) having a superconducting metallized area, and a superconducting eyelet (50) for sealing plate (40) into frame (30). The plate (40) is brazed to eyelet (50) which is then electron beam welded to frame (30). A method for providing a ceramic object mounted in a metal member to withstand cryogenic temperatures is also provided. The method involves a new metallization process for coating a selected area of a ceramic object with a thin film of a superconducting material. Finally, a method for assembling an electron beam accelerator cavity utilizing the srf window assembly is provided. The procedure is carried out within an ultra clean room to minimize exposure to particulates which adversely affect the performance of the cavity within the electron beam accelerator.

Phillips, Harry Lawrence (Seaford, VA); Elliott, Thomas S. (Yorktown, VA)

1998-01-01T23:59:59.000Z

67

Photovoltaic self-assembly.  

DOE Green Energy (OSTI)

This late-start LDRD was focused on the application of chemical principles of self-assembly on the ordering and placement of photovoltaic cells in a module. The drive for this chemical-based self-assembly stems from the escalating prices in the 'pick-and-place' technology currently used in the MEMS industries as the size of chips decreases. The chemical self-assembly principles are well-known on a molecular scale in other material science systems but to date had not been applied to the assembly of cells in a photovoltaic array or module. We explored several types of chemical-based self-assembly techniques, including gold-thiol interactions, liquid polymer binding, and hydrophobic-hydrophilic interactions designed to array both Si and GaAs PV chips onto a substrate. Additional research was focused on the modification of PV cells in an effort to gain control over the facial directionality of the cells in a solvent-based environment. Despite being a small footprint research project worked on for only a short time, the technical results and scientific accomplishments were significant and could prove to be enabling technology in the disruptive advancement of the microelectronic photovoltaics industry.

Lavin, Judith; Kemp, Richard Alan; Stewart, Constantine A.

2010-10-01T23:59:59.000Z

68

ORNL/TM-2007/44 Leadership Computing Facility  

E-Print Network (OSTI)

........................................................................... 97 E.10. Single fuel assembly of a sodium-cooled, fast-spectrum nuclear reactor reactors, separations reprocessing facilities, and fuel fabrication/storage facilities. Nuclear physics CTEM collisionless trapped electron mode CY calendar year DFT density functional theory DNA

69

Power module assembly  

SciTech Connect

A power module assembly of the type suitable for deployment in a vehicular power inverter, wherein the power inverter has a grounded chassis, is provided. The power module assembly comprises a conductive base layer electrically coupled to the chassis, an insulating layer disposed on the conductive base layer, a first conductive node disposed on the insulating layer, a second conductive node disposed on the insulating layer, wherein the first and second conductive nodes are electrically isolated from each other. The power module assembly also comprises a first capacitor having a first electrode electrically connected to the conductive base layer, and a second electrode electrically connected to the first conductive node, and further comprises a second capacitor having a first electrode electrically connected to the conductive base layer, and a second electrode electrically connected to the second conductive node.

Campbell, Jeremy B. (Torrance, CA); Newson, Steve (Redondo Beach, CA)

2011-11-15T23:59:59.000Z

70

Low inductance connector assembly  

DOE Patents (OSTI)

A busbar connector assembly for coupling first and second terminals on a two-terminal device to first and second contacts on a power module is provided. The first terminal resides proximate the first contact and the second terminal resides proximate the second contact. The assembly comprises a first bridge having a first end configured to be electrically coupled to the first terminal, and a second end configured to be electrically coupled to the second contact, and a second bridge substantially overlapping the first bridge and having a first end electrically coupled to the first contact, and a second end electrically coupled to the second terminal.

Holbrook, Meghan Ann; Carlson, Douglas S

2013-07-09T23:59:59.000Z

71

Deputy Secretary Poneman's Remarks at the Nuclear Energy Assembly - As  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assembly - Energy Assembly - As Prepared for Delivery Deputy Secretary Poneman's Remarks at the Nuclear Energy Assembly - As Prepared for Delivery May 11, 2011 - 6:01pm Addthis Deputy Secretary of Energy Daniel Poneman Remarks as Prepared for Delivery Nuclear Energy Assembly Wednesday, May 11, 2011 Washington, DC Introduction Good morning. Thank you Jim for the introduction, and thank you for the invitation to speak here today. I just got back last night from Savannah River Site, where I visited our nuclear facilities and found a community that is dedicated, capable, and energized by a vision to build their expertise in environmental remediation, national security, and clean energy into a dynamic future vision for the site and for the community. It's a great thing. As soon as you pass through the gates, you find

72

Rotary shaft sealing assembly  

DOE Patents (OSTI)

A rotary shaft sealing assembly in which a first fluid is partitioned from a second fluid in a housing assembly having a rotary shaft located at least partially within. In one embodiment a lip seal is lubricated and flushed with a pressure-generating seal ring preferably having an angled diverting feature. The pressure-generating seal ring and a hydrodynamic seal may be used to define a lubricant-filled region with each of the seals having hydrodynamic inlets facing the lubricant-filled region. Another aspect of the sealing assembly is having a seal to contain pressurized lubricant while withstanding high rotary speeds. Another rotary shaft sealing assembly embodiment includes a lubricant supply providing a lubricant at an elevated pressure to a region between a lip seal and a hydrodynamic seal with a flow control regulating the flow of lubricant past the lip seal. The hydrodynamic seal may include an energizer element having a modulus of elasticity greater than the modulus of elasticity of a sealing lip of the hydrodynamic seal.

Dietle, Lannie L. (Houston, TX); Schroeder, John E. (Richmond, TX); Kalsi, Manmohan S. (Houston, TX); Alvarez, Patricio D. (Richmond, TX)

2010-09-21T23:59:59.000Z

73

Rotary shaft sealing assembly  

DOE Patents (OSTI)

A rotary shaft sealing assembly in which a first fluid is partitioned from a second fluid in a housing assembly having a rotary shaft located at least partially within. In one embodiment a lip seal is lubricated and flushed with a pressure-generating seal ring preferably having an angled diverting feature. The pressure-generating seal ring and a hydrodynamic seal may be used to define a lubricant-filled region with each of the seals having hydrodynamic inlets facing the lubricant-filled region. Another aspect of the sealing assembly is having a seal to contain pressurized lubricant while withstanding high rotary speeds. Another rotary shaft sealing assembly embodiment includes a lubricant supply providing a lubricant at an elevated pressure to a region between a lip seal and a hydrodynamic seal with a flow control regulating the flow of lubricant past the lip seal. The hydrodynamic seal may include an energizer element having a modulus of elasticity greater than the modulus of elasticity of a sealing lip of the hydrodynamic seal.

Dietle, Lannie L; Schroeder, John E; Kalsi, Manmohan S; Alvarez, Patricio D

2013-08-13T23:59:59.000Z

74

Solar collector assembly  

Science Conference Proceedings (OSTI)

A solar collector assembly includes shingles which have integral tubes projecting therefrom, and which are mounted in overlapping parallel array. Mounting brackets for the shingles are engaged on roof rafters or the like, and interlocked light transmissive plates overlie the shingles. The plates are also engaged with shingle components. A special fitting for the tube ends is provided.

Murphy, J.A.

1980-09-09T23:59:59.000Z

75

Corium protection assembly  

DOE Patents (OSTI)

A corium protection assembly includes a perforated base grid disposed below a pressure vessel containing a nuclear reactor core and spaced vertically above a containment vessel floor to define a sump therebetween. A plurality of layers of protective blocks are disposed on the grid for protecting the containment vessel floor from the corium.

Gou, Perng-Fei (Saratoga, CA); Townsend, Harold E. (Campbell, CA); Barbanti, Giancarlo (Sirtori, IT)

1994-01-01T23:59:59.000Z

76

Segmented stator assembly  

DOE Patents (OSTI)

An electric machine and stator assembly are provided that include a continuous stator portion having stator teeth, and a tooth tip portion including tooth tips corresponding to the stator teeth of the continuous stator portion, respectively. The tooth tip portion is mounted onto the continuous stator portion.

Lokhandwalla, Murtuza; Alexander, James Pellegrino; El-Refaie, Ayman Mohamed Fawzi; Shah, Manoj Ramprasad; Quirion, Owen Scott

2013-04-02T23:59:59.000Z

77

NEUTRONIC REACTOR BURIAL ASSEMBLY  

DOE Patents (OSTI)

A burial assembly is shown whereby an entire reactor core may be encased with lead shielding, withdrawn from the reactor site and buried. This is made possible by a five-piece interlocking arrangement that may be easily put together by remote control with no aligning of bolt holes or other such close adjustments being necessary.

Treshow, M.

1961-05-01T23:59:59.000Z

78

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

79

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2008 Facility News Future of User Facility Discussed at Fall Workshop As a national user facility, ARM is accessible to scientists around the globe for...

80

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2004 Facility News ARM Climate Research Facility Achieves User Milestone Three Months Ahead of Schedule Bookmark and Share Summary of the ARM Climate Research Facility User...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

82

FACILITY SURVEY & TRANSFER Facility Survey & Transfer Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SURVEY & TRANSFER SURVEY & TRANSFER Facility Survey & Transfer Overview Transfer Activities Checklist Pre-Survey Information Request Survey Report Content Detailed Walkdown Checklist Walkdown Checklist Clipboard Aids S & M Checklist Survey Report Example - Hot Storage Garden Survey Report Example - Tritium System Test Assembly Survey Report Example - Calutron Overview As DOE facilities become excess, many that are radioactively and/or chemically contaminated will become candidate for transfer to DOE-EM for deactivation and decommissioning. Requirements and guidance for such transfers are contained in:  DOE Order 430.1B Chg. 2, REAL PROPERTY & ASSET MANAGEMENT  DOE Guide 430.1-5, TRANSITION IMPLEMENTATION GUIDE The transfer process is illustrated in the Transfer Process figure. The purpose here is to provide examples of methods and

83

Californium Neutron Irradiation Facility  

Science Conference Proceedings (OSTI)

Californium Neutron Irradiation Facility. Summary: ... Cf irradiation facility (Photograph by: Neutron Physics Group). Lead Organizational Unit: pml. Staff: ...

2013-07-23T23:59:59.000Z

84

Research Facilities and Programs  

Science Conference Proceedings (OSTI)

WEB RESOURCES: Magnesium Research Facilities and Programs ... to universities, corporations, and other facilities involved in magnesium research, 0, 1025...

85

Mobile Solar Tracker Facility  

Science Conference Proceedings (OSTI)

Mobile Solar Tracker Facility. ... NIST's mobile solar tracking facility is used to characterize the electrical performance of photovoltaic panels. ...

2011-11-15T23:59:59.000Z

86

Vacuum breaker valve assembly  

DOE Patents (OSTI)

Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening.

Thompson, Jeffrey L. (San Jose, CA); Upton, Hubert Allen (Morgan Hill, CA)

1999-04-27T23:59:59.000Z

87

Vacuum breaker valve assembly  

Science Conference Proceedings (OSTI)

Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening. 1 fig.

Thompson, J.L.; Upton, H.A.

1999-04-27T23:59:59.000Z

88

Low inductance busbar assembly  

DOE Patents (OSTI)

A busbar assembly for electrically coupling first and second busbars to first and second contacts, respectively, on a power module is provided. The assembly comprises a first terminal integrally formed with the first busbar, a second terminal integrally formed with the second busbar and overlapping the first terminal, a first bridge electrode having a first tab electrically coupled to the first terminal and overlapping the first and second terminals, and a second tab electrically coupled to the first contact, a second bridge electrode having a third tab electrically coupled to the second terminal, and overlapping the first and second terminals and the first tab, and a fourth tab electrically coupled to the second contact, and a fastener configured to couple the first tab to the first terminal, and the third tab to the second terminal.

Holbrook, Meghan Ann (Manhattan Beach, CA)

2010-09-21T23:59:59.000Z

89

Turbine seal assembly  

SciTech Connect

A seal assembly that limits gas leakage from a hot gas path to one or more disc cavities in a turbine engine. The seal assembly includes a seal apparatus that limits gas leakage from the hot gas path to a respective one of the disc cavities. The seal apparatus comprises a plurality of blade members rotatable with a blade structure. The blade members are associated with the blade structure and extend toward adjacent stationary components. Each blade member includes a leading edge and a trailing edge, the leading edge of each blade member being located circumferentially in front of the blade member's corresponding trailing edge in a direction of rotation of the turbine rotor. The blade members are arranged such that a space having a component in a circumferential direction is defined between adjacent circumferentially spaced blade members.

Little, David A.

2013-04-16T23:59:59.000Z

90

Mechanical Seal Assembly  

DOE Patents (OSTI)

An improved mechanical seal assembly is provided for sealing rotating shafts with respect to their shaft housings, wherein the rotating shafts are subject to substantial axial vibrations. The mechanical seal assembly generally includes a rotating sealing ring fixed to the shaft, a non-rotating sealing ring adjacent to and in close contact with the rotating sealing ring for forming an annular seal about the shaft, and a mechanical diode element that applies a biasing force to the non-rotating sealing ring by means of hemispherical joint. The alignment of the mechanical diode with respect to the sealing rings is maintained by a series of linear bearings positioned axially along a desired length of the mechanical diode. Alternative embodiments include mechanical or hydraulic amplification components for amplifying axial displacement of the non-rotating sealing ring and transferring it to the mechanical diode.

Kotlyar, Oleg M.

1999-06-18T23:59:59.000Z

91

Mechanical seal assembly  

DOE Patents (OSTI)

An improved mechanical seal assembly is provided for sealing rotating shafts with respect to their shaft housings, wherein the rotating shafts are subject to substantial axial vibrations. The mechanical seal assembly generally includes a rotating sealing ring fixed to the shaft, a non-rotating sealing ring adjacent to and in close contact with the rotating sealing ring for forming an annular seal about the shaft, and a mechanical diode element that applies a biasing force to the non-rotating sealing ring by means of hemispherical joint. The alignment of the mechanical diode with respect to the sealing rings is maintained by a series of linear bearings positioned axially along a desired length of the mechanical diode. Alternative embodiments include mechanical or hydraulic amplification components for amplifying axial displacement of the non-rotating sealing ring and transferring it to the mechanical diode.

Kotlyar, Oleg M. (Salt Lake City, UT)

2001-01-01T23:59:59.000Z

92

FLUORINE CELL ANODE ASSEMBLY  

DOE Patents (OSTI)

An improved anode assembly is deslgned for use in electrolytlc cells ln the productlon of hydrogen and fluorlne from a moIten electrolyte. The anode assembly comprises a copper post, a copper hanger supported by the post, a plurality of carbon anode members, and bolt means for clamplng half of the anode members to one slde of the hanger and for clamplng the other half of the anode members to the other slde of the hanger. The heads of the clamplng bolts are recessed withln the anode members and carbon plugs are inserted ln the recesses above the bolt heads to protect the boIts agalnst corroslon. A copper washer is provided under the head of each clamplng boIt such that the anode members can be tightly clamped to the hanger with a resultant low anode jolnt resistance. (AEC)

Cable, R.E.; Goode, W.B. Jr.; Henderson, W.K.; Montillon, G.H.

1962-06-26T23:59:59.000Z

93

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

063-2011 063-2011 February 2011 Superseding DOE-STD-1063-2006 April 2006 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2011 ii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/ns/techstds/ DOE-STD-1063-2011 iii FOREWORD 1. This Department of Energy (DOE) standard is approved for use by all DOE/National Nuclear Security Administration (NNSA) Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations,

94

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-1063-2006 April 2006 Superseding DOE-STD-1063-2000 March 2000 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2006 ii Available on the Department of Energy Technical Standards Program web site at http://www.eh.doe.gov/techstds/ DOE-STD-1063-2006 iii FOREWORD 1. This Department of Energy standard is approved for use by all DOE Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should

95

Facility Type!  

Office of Legacy Management (LM)

ITY: ITY: --&L~ ----------- srct-r~ -----------~------~------- if yee, date contacted ------------- cl Facility Type! i I 0 Theoretical Studies Cl Sample 84 Analysis ] Production 1 Diepasal/Storage 'YPE OF CONTRACT .--------------- 1 Prime J Subcontract&- 1 Purchase Order rl i '1 ! Other information (i.e., ---------~---~--~-------- :ontrait/Pirchaee Order # , I C -qXlJ- --~-------~~-------~~~~~~ I I ~~~---~~~~~~~T~~~ FONTRACTING PERIODi IWNERSHIP: ,I 1 AECIMED AECMED GOVT GOUT &NTtiAC+OR GUN-I OWNED ----- LEEE!? M!s LE!Ps2 -LdJG?- ---L .ANDS ILJILDINGS X2UIPilENT IRE OR RAW HA-I-L :INAL PRODUCT IASTE Z. RESIDUE I I kility l pt I ,-- 7- ,+- &!d,, ' IN&"E~:EW AT SITE -' ---------------- , . Control 0 AEC/tlED managed operations

96

Research Facility,  

NLE Websites -- All DOE Office Websites (Extended Search)

Collecting and Delivering the Data Collecting and Delivering the Data As a general condition for use of the ARM Climate Research Facility, users are required to include their data in the ARM Data Archive. All data acquired must be of sufficient quality to be useful and must be documented such that users will be able to clearly understand the meaning and organization of the data. Final, quality-assured data sets are stored in the Data Archive and are freely accessible to the general scientific community. Preliminary data may be shared among field campaign participants during and shortly following the campaign. To facilitate sharing of preliminary data, the ARM Data Archive establishes restricted access capability, limited to participants and data managers.

97

Facility automation for retail facilities  

Science Conference Proceedings (OSTI)

This article will focus on retail chain stores with areas of 22,000 to 75,000 sq ft, but much of the article will apply to all retail stores independent of size. Typically, a store is serviced by 5 to 15 rooftop HVAC units with a total cooling capacity of 50 to 150 tons, depending on the floor area and geographic location. The interior lighting represents a load of 80 to 300 KW with three lighting levels--retail, stocking, and security or night. Most stores are located in strip centers, and therefore, the parking lot lighting is provided by the landlord, but each store does control and service its own sign lighting. Generally, the total load controlled by an FAS represents 130 to 450 KW with corresponding annual energy costs ranging from $65,000 to $200,000 (natural gas and electricity), depending on the size of the store and the local unit costs of energy. Historical utility data, electrical and mechanical drawings, site surveys, significant analyses of data, and most importantly, discussions with corporate facilities management personnel and store operations personnel provide the source for the development theory and sequence of operation of the design of the facility automation systems for retail stores. The three main goals of an FAS are: reduce utility operating costs, maintain comfort levels during occupied hours, reduce HVAC maintenance costs.

Ameduri, G. (Roth Bros., Inc., Youngstown, OH (United States). Facilities Automation Division)

1994-12-01T23:59:59.000Z

98

Assembly of Energy Nanomaterials via Water Based ...  

Science Conference Proceedings (OSTI)

Page 1. Assembly of Energy Nanomaterials via Water Based Assembly Paula T. Hammond Department of Chemical Engineering ...

99

Nuclear core and fuel assemblies  

DOE Patents (OSTI)

A fast flux nuclear core of a plurality of rodded, open-lattice assemblies having a rod pattern rotated relative to a rod support structure pattern. Elongated fuel rods are oriented on a triangular array and laterally supported by grid structures positioned along the length of the assembly. Initial inter-assembly contact is through strongbacks at the corners of the support pattern and peripheral fuel rods between adjacent assemblies are nested so as to maintain a triangular pitch across a clearance gap between the other portions of adjacent assemblies. The rod pattern is rotated relative to the strongback support pattern by an angle .alpha. equal to sin .sup.-1 (p/2c), where p is the intra-assembly rod pitch and c is the center-to-center spacing among adjacent assemblies.

Downs, Robert E. (Monroeville, PA)

1981-01-01T23:59:59.000Z

100

Automobile Assembly Plant EPI | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Automobile Assembly Plant EPI Automobile Assembly Plant EPI Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Harrisburg Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Harrisburg Facility Biomass Facility Harrisburg Facility Biomass Facility Jump to: navigation, search Name Harrisburg Facility Biomass Facility Facility Harrisburg Facility Sector Biomass Facility Type Landfill Gas Location Dauphin County, Pennsylvania Coordinates 40.2734277°, -76.7336521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2734277,"lon":-76.7336521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

102

Brookhaven Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brookhaven Facility Biomass Facility Brookhaven Facility Biomass Facility Jump to: navigation, search Name Brookhaven Facility Biomass Facility Facility Brookhaven Facility Sector Biomass Facility Type Landfill Gas Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

103

V-Site Assembly Building and Gun Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V-Site Assembly Building and Gun Site V-Site Assembly Building and Gun Site V-Site Assembly Building and Gun Site V-Site Assembly Building and Gun Site The V-Site buildings and the nearby Gun Site are the last significant structures still standing at Los Alamos associated with the development and assembly of the world's first nuclear devices. Located away from the main laboratory for safety and security reasons, the V-Site consisted of a cluster of wooden buildings built in January 1944 as a high explosives handling and assembly facility. V-Site was one of the most secret areas in the Manhattan Project as it was here that all elements of the project finally came together. Few records exist to document activities at the site. Photographs were prohibited, and the area was hidden behind a "no-peek" fence. The Gadget, which became the prototype for the "Fat Man"

104

Removable feedwater sparger assembly  

DOE Patents (OSTI)

A removable feedwater sparger assembly includes a sparger having an inlet pipe disposed in flow communication with the outlet end of a supply pipe. A tubular coupling includes an annular band fixedly joined to the sparger inlet pipe and a plurality of fingers extending from the band which are removably joined to a retention flange extending from the supply pipe for maintaining the sparger inlet pipe in flow communication with the supply pipe. The fingers are elastically deflectable for allowing engagement of the sparger inlet pipe with the supply pipe and for disengagement therewith. 8 figs.

Challberg, R.C.

1994-10-04T23:59:59.000Z

105

NEW HOT LABORATORY FACILITIES AT LOS ALAMOS  

SciTech Connect

New Hot Laboratory Facilities which support three major research programs directed by the Los Alamos Scientific Laboratory of the University of California are described. For the Nuclear Rocket Propulsion Program, a hot cell addition to the Radio Chemistry Building at Los Alamos will be completed early in 1963, and construction is expected to start soon on the hot cell addition to the Maintenance, Assembly and Disassembly Building at the Nuclear Rocket Development Station in Nevada. Integral hot laboratories are designed in the facilities for the Ultra High Temperature Reactor Experiment and the Fast Reactor Core Test at Los Alamos. (auth)

Wherritt, C.R.; Franke, P.; Field, R.E.; Lyle, A.R.

1962-01-01T23:59:59.000Z

106

Automated array assembly. Final report  

DOE Green Energy (OSTI)

Three main sections are included which describe a general technology assessment and manufacturing cost analysis; a near-term (1982) factory design; and the results of an experimental production study for the large-scale production of flat-panel silicon solar-cell arrays. The results of an extensive study and detailed analysis of technologies which could be related to array module manufacturing are presented. From this study, several manufacturing sequences emerge as candidates for satisfying the ERDA/JPL cost goal of $0.50/W selling price in 1986. A minimum manufacturing cost was found in a highly automated line of $0.30/W assuming the silicon is free. The panels are of a double-glass construction and are based on round wafers. Screen-printed silver has been used as the metallization with a spray-coated antireflection (AR) layer. The least expensive junction-formation technology appears to be ion implantation;however, several other technologies also may be used with very little cost penalty as described. An interim 1982 factory is described for the large-scale production of silicon solar-cell array modules. The boundary conditions for this design are the use of Czochralski silicon crystals and $25/kg polycrystalline silicon. The objective is a large-scale production facility to meet an intermediate ERDA cost goal of $2.00/W in 1982. A 6-month experimental production study of the elements of low-cost solar-cell manufacturing sequences is described as an outgrowth of the cost and manufacturing studies. This program consisted of three parts: an experimental production line study of the major variables associated with the fabrication of 3-in.-diameter silicon solar cells; a study of thick-film screen-printed silver metallization; and panel design and assembly development. (WHK)

D'Aiello, R.V.

1977-12-01T23:59:59.000Z

107

Microchannel heat sink assembly  

DOE Patents (OSTI)

The present invention provides a microchannel heat sink with a thermal range from cryogenic temperatures to several hundred degrees centigrade. The heat sink can be used with a variety of fluids, such as cryogenic or corrosive fluids, and can be operated at a high pressure. The heat sink comprises a microchannel layer preferably formed of silicon, and a manifold layer preferably formed of glass. The manifold layer comprises an inlet groove and outlet groove which define an inlet manifold and an outlet manifold. The inlet manifold delivers coolant to the inlet section of the microchannels, and the outlet manifold receives coolant from the outlet section of the microchannels. In one embodiment, the manifold layer comprises an inlet hole extending through the manifold layer to the inlet manifold, and an outlet hole extending through the manifold layer to the outlet manifold. Coolant is supplied to the heat sink through a conduit assembly connected to the heat sink. A resilient seal, such as a gasket or an O-ring, is disposed between the conduit and the hole in the heat sink in order to provide a watertight seal. In other embodiments, the conduit assembly may comprise a metal tube which is connected to the heat sink by a soft solder. In still other embodiments, the heat sink may comprise inlet and outlet nipples. The present invention has application in supercomputers, integrated circuits and other electronic devices, and is suitable for cooling materials to superconducting temperatures. 13 figs.

Bonde, W.L.; Contolini, R.J.

1992-03-24T23:59:59.000Z

108

Uranium Processing Facility | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

About / Transforming Y-12 / Uranium Processing Facility About / Transforming Y-12 / Uranium Processing Facility Uranium Processing Facility UPF will be a state-of-the-art, consolidated facility for enriched uranium operations including assembly, disassembly, dismantlement, quality evaluation, and product certification. An integral part of Y-12's transformation efforts and a key component of the National Nuclear Security Administration's Uranium Center of Excellence, the Uranium Processing Facility is one of two facilities at Y-12 whose joint mission will be to accomplish the storage and processing of all enriched uranium in one much smaller, centralized area. Safety, security and flexibility are key design attributes of the facility, which is in the preliminary design phase of work. UPF will be built to modern standards and engage new technologies through a responsive and agile

109

Gas separation membrane module assembly  

SciTech Connect

A gas-separation membrane module assembly and a gas-separation process using the assembly. The assembly includes a set of tubes, each containing gas-separation membranes, arranged within a housing. The housing contains a tube sheet that divides the space within the housing into two gas-tight spaces. A permeate collection system within the housing gathers permeate gas from the tubes for discharge from the housing.

Wynn, Nicholas P (Palo Alto, CA); Fulton, Donald A. (Fairfield, CA)

2009-03-31T23:59:59.000Z

110

International Facility Management Association Strategic Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Management Association Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning © 2009 | International Facility Management Association For additional information, contact: 1 e. Greenway Plaza, Suite 1100 houston, tX 77046-0104 USA P: + 1-713-623-4362 F: + 1-713-623-6124 www.ifma.org taBle OF cOntentS PreFace ......................................................... 2 executive Summary .................................... 3 Overview ....................................................... 4 DeFinitiOn OF Strategic Facility Planning within the Overall cOntext OF Facility Planning ................. 5 SPecializeD analySeS ................................ 9 OrganizatiOnal aPPrOacheS tO SFP ... 10 the SFP PrOceSS .......................................

111

Office of Nuclear Facility Basis & Facility Design  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Safety Basis & Facility Design(HS-31) Reports to the Office of Nuclear Safety About Us The Office of Nuclear Safety Basis & Facility Design establishes safety...

112

Multi-position photovoltaic assembly  

Science Conference Proceedings (OSTI)

The invention is directed to a PV assembly, for use on a support surface, comprising a base, a PV module, a multi-position module support assembly, securing the module to the base at shipping and inclined-use angles, a deflector, a multi-position deflector support securing the deflector to the base at deflector shipping and deflector inclined-use angles, the module and deflector having opposed edges defining a gap therebetween. The invention permits transport of the PV assemblies in a relatively compact form, thus lowering shipping costs, while facilitating installation of the PV assemblies with the PV module at the proper inclination.

Dinwoodie, Thomas L. (Piedmont, CA)

2003-03-18T23:59:59.000Z

113

Next-generation transcriptome assembly  

Science Conference Proceedings (OSTI)

Transcriptomics studies often rely on partial reference transcriptomes that fail to capture the full catalog of transcripts and their variations. Recent advances in sequencing technologies and assembly algorithms have facilitated the reconstruction of the entire transcriptome by deep RNA sequencing (RNA-seq), even without a reference genome. However, transcriptome assembly from billions of RNA-seq reads, which are often very short, poses a significant informatics challenge. This Review summarizes the recent developments in transcriptome assembly approaches - reference-based, de novo and combined strategies-along with some perspectives on transcriptome assembly in the near future.

Martin, Jeffrey A.; Wang, Zhong

2011-09-01T23:59:59.000Z

114

CGAL: computing genome assembly likelihoods  

E-Print Network (OSTI)

SM, Lei M, Li J, et al: Genome sequencing in microfabricatedDe novo bacterial genome sequencing: millions of very shortGenome assembly, evaluation, likelihood, sequencing.

Rahman, Atif; Pachter, Lior

2013-01-01T23:59:59.000Z

115

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

than any other quarter on record-961 The U.S. Department of Energy requires national user facilities to report facility use by total visitor days and facility to track actual...

116

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility News Data Collection from Mobile Facility on Gan Island Suspended Local weather balloon launch volunteers pose with the AMF team on Gan Island after completing their...

117

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

approximately 22,500 square kilometers, or the approximate area of a modern climate model grid cell. Centered around the SGP Central Facility, these extended facilities are...

118

Chemistry Dept. Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities As a research organization within a National Laboratory, the Chemistry Department operates research facilities that are available to other researchers as...

119

from Isotope Production Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Cancer-fighting treatment gets boost from Isotope Production Facility April 13, 2012 Isotope Production Facility produces cancer-fighting actinium - 2 - 2:32 Isotope cancer...

120

Fuel Fabrication Facility  

National Nuclear Security Administration (NNSA)

Construction of the Mixed Oxide Fuel Fabrication Facility Construction of the Mixed Oxide Fuel Fabrication Facility November 2005 May 2007 June 2008 May 2012...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

User Facility Agreement Form  

NLE Websites -- All DOE Office Websites (Extended Search)

5. Which Argonne user facility will be hosting you? * Advanced Leadership Computing Facility (ALCF) Advanced Photon Source (APS) Argonne Tandem Linear...

122

NREL: Biomass Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities At NREL's state-of-the-art biomass research facilities, researchers design and optimize processes to convert renewable biomass feedstocks into transportation fuels and...

123

Oak Ridge Reservation Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

processed for shipment to the Nevada Test Site or other appropriate disposal facility. Molten Salt Reactor Experiment Facility The Molten Salt Reactor Experiment (MSRE) operated...

124

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2008 Facility News ARM Mobile Facility Completes Field Campaign in Germany Researchers will study severe precipitation events that occurred in August and October...

125

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 Facility News National User Facility Organization Meets to Discuss Progress and Ideas In late April, the ARM Technical Director attended an annual meeting of the...

126

Facility Safeguardability Assessment Report  

National Nuclear Security Administration (NNSA)

of the Facility Safeguardability Analysis (FSA) Process RA Bari SJ Johnson J Hockert R Wigeland EF Wonder MD Zentner August 2012 PNNL- 21698 Overview of the Facility...

127

Facility Safeguardability Assessment Report  

National Nuclear Security Administration (NNSA)

facilities or research facilities that involve previously unused processes or technologies, comparison with previously required safeguard design features may not be...

128

Photovoltaic cell assembly  

DOE Patents (OSTI)

A photovoltaic assembly for converting high intensity solar radiation into lectrical energy in which a solar cell is separated from a heat sink by a thin layer of a composite material which has excellent dielectric properties and good thermal conductivity. This composite material is a thin film of porous Al.sub.2 O.sub.3 in which the pores have been substantially filled with an electrophoretically-deposited layer of a styrene-acrylate resin. This composite provides electrical breakdown strengths greater than that of a layer consisting essentially of Al.sub.2 O.sub.3 and has a higher thermal conductivity than a layer of styrene-acrylate alone.

Beavis, Leonard C. (Albuquerque, NM); Panitz, Janda K. G. (Edgewood, NM); Sharp, Donald J. (Albuquerque, NM)

1990-01-01T23:59:59.000Z

129

Photovoltaic cell assembly  

DOE Patents (OSTI)

A photovoltaic assembly for converting high intensity solar radiation into electrical energy in which a solar cell is separated from a heat sink by a thin layer of a composite material which has excellent dielectric properties and good thermal conductivity. This composite material is a thin film of porous Al{sub 2}O{sub 3} in which the pores have been substantially filled with an electrophoretically-deposited layer of a styrene-acrylate resin. This composite provides electrical breakdown strengths greater than that of a layer consisting essentially of Al{sub 2}O{sub 3} and has a higher thermal conductivity than a layer of styrene-acrylate alone. 2 figs.

Beavis, L.C.; Panitz, J.K.G.; Sharp, D.J.

1989-09-26T23:59:59.000Z

130

Rotatable seal assembly  

DOE Patents (OSTI)

An assembly is provided for rotatably supporting a rotor on a stator so that vacuum chambers in the rotor and stator remain in communication while the chambers are sealed from ambient air, which enables the use of a ball bearing or the like to support most of the weight of the rotor. The apparatus includes a seal device mounted on the rotor to rotate therewith, but shiftable in position on the rotor while being sealed to the rotor as by an O-ring. The seal device has a flat face that is biased towards a flat face on the stator, and pressurized air is pumped between the faces to prevent contact between them while spacing them a small distance apart to avoid the inflow of large amounts of air between the faces and into the vacuum chambers.

Logan, Clinton M. (Pleasanton, CA); Garibaldi, Jack L. (Livermore, CA)

1982-01-01T23:59:59.000Z

131

Switchable heat pipe assembly  

SciTech Connect

The heat pipe assembly is formed into an H-shape or a Y-shape. The H-shaped configuration comprises two heat pipes, each having condenser and evaporator sections with wicking therein coupled by a tube with wick at their evaporator sections. The Y-shaped configuration utilizes a common evaporator section in place of the two evaporator sections of the H-shaped configuration. In both configurations, the connection between the vapor spaces of the two heat pipes equalizes vapor pressure within the heat pipes. Although both heat pipes have wicks, they have sufficient fluid only to saturate a single pipe. If heat is applied to the condenser section of one of the pipes, this heat pipe becomes inoperative since all the fluid is transferred to the second pipe which can operate with a lower thermal load.

Sun, T.H.; Basiulis, A.

1977-02-15T23:59:59.000Z

132

Facility Representative Program: 2003 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Facility Representative Workshop 3 Facility Representative Workshop May 13 - 15, 2003 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 13, 2003 Theme: Program Successes and Challenges 8:00 a.m. John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathleen Carlson Manager, Nevada Site Office 8:30 a.m. Keynote Address Savannah River Site and Facility Reps - A Shared History and Common Future Jeffrey M. Allison Manager, Savannah River Operations Office 9:00 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board

133

NREL: Research Facilities - Test and User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and User Facilities Test and User Facilities NREL has test and user facilities available to industry and other organizations for researching, developing, and evaluating renewable energy and energy efficiency technologies. Here you'll find an alphabetical listing and brief descriptions of NREL's test and user facilities. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A Advanced Research Turbines At our wind testing facilities, we have turbines available to test new control schemes and equipment for reducing loads on wind turbine components. Learn more about the Advanced Research Turbines on our Wind Research website. Back to Top D Distributed Energy Resources Test Facility This facility was designed to assist the distributed power industry in the

134

Facility Representative Program: 2000 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Facility Representative Workshop 0 Facility Representative Workshop May 16-18, 2000 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Tuesday, May 16, 2000 Theme for Day 1: Sustaining the Success of the Facility Representative Program 8:00 a.m. - Opening Remarks - Joe Arango, Facility Representative Program Manager 8:05 a.m. - Welcome - Kenneth Powers, Deputy Manager Nevada Operations Office 8:15 a.m. - Deputy Secretary Remarks - T. J. Glauthier, Deputy Secretary of Energy 8:30 a.m. - Keynote Address - Jerry Lyle, Assistant Manager for Environmental Management, Idaho Operations Office 9:00 a.m. - Facility Representative of the Year Presentation - Mark B. Whitaker, Departmental Representative 9:30 a.m. - Break 9:50 a.m. - Program Results and Goals - Joe Arango, Facility Representative Program Manager

135

Fuel cell sub-assembly  

DOE Patents (OSTI)

A fuel cell sub-assembly comprising a plurality of fuel cells, a first section of a cooling means disposed at an end of the assembly and means for connecting the fuel cells and first section together to form a unitary structure.

Chi, Chang V. (Brookfield, CT)

1983-01-01T23:59:59.000Z

136

Moisture Research - Optimizing Wall Assemblies  

SciTech Connect

The Consortium for Advanced Residential Buildings (CARB) evaluated several different configurations of wall assemblies to determine the accuracy of moisture modeling and make recommendations to ensure durable, efficient assemblies. WUFI and THERM were used to model the hygrothermal and heat transfer characteristics of these walls.

Arena, L.; Mantha, P.

2013-05-01T23:59:59.000Z

137

Stator and method of assembly  

DOE Patents (OSTI)

The present application provides a stator. The stator may include a number of poles and a stator tip and cooling assembly. The stator tip and cooling assembly may include a number of stator tips with a number of cooling tubes adjacent thereto such that the stator tips align with the poles and the cooling tubes cool the poles.

Alexander, James Pellegrino; El-Refaie, Ayman Mohamed Fawzi; Shen, Xiaochun

2013-06-18T23:59:59.000Z

138

Guide to research facilities  

SciTech Connect

This Guide provides information on facilities at US Department of Energy (DOE) and other government laboratories that focus on research and development of energy efficiency and renewable energy technologies. These laboratories have opened these facilities to outside users within the scientific community to encourage cooperation between the laboratories and the private sector. The Guide features two types of facilities: designated user facilities and other research facilities. Designated user facilities are one-of-a-kind DOE facilities that are staffed by personnel with unparalleled expertise and that contain sophisticated equipment. Other research facilities are facilities at DOE and other government laboratories that provide sophisticated equipment, testing areas, or processes that may not be available at private facilities. Each facility listing includes the name and phone number of someone you can call for more information.

Not Available

1993-06-01T23:59:59.000Z

139

Advanced gray rod control assembly  

DOE Patents (OSTI)

An advanced gray rod control assembly (GRCA) for a nuclear reactor. The GRCA provides controlled insertion of gray rod assemblies into the reactor, thereby controlling the rate of power produced by the reactor and providing reactivity control at full power. Each gray rod assembly includes an elongated tubular member, a primary neutron-absorber disposed within the tubular member said neutron-absorber comprising an absorber material, preferably tungsten, having a 2200 m/s neutron absorption microscopic capture cross-section of from 10 to 30 barns. An internal support tube can be positioned between the primary absorber and the tubular member as a secondary absorber to enhance neutron absorption, absorber depletion, assembly weight, and assembly heat transfer characteristics.

Drudy, Keith J; Carlson, William R; Conner, Michael E; Goldenfield, Mark; Hone, Michael J; Long, Jr., Carroll J; Parkinson, Jerod; Pomirleanu, Radu O

2013-09-17T23:59:59.000Z

140

Facilities/Staff Hydrogen  

Science Conference Proceedings (OSTI)

Thermophysical Properties of Hydrogen. FACILITIES and STAFF. The Thermophysical Properties Division is the Nation's ...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

America's Wind Testing Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Testing Facilities Wind Testing Facilities America's Wind Testing Facilities Addthis National Wind Technology Center - Colorado 1 of 7 National Wind Technology Center - Colorado The first of 4 towers is lifted as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-15 13:53 National Wind Technology Center - Colorado 2 of 7 National Wind Technology Center - Colorado Workers use a giant crane for lifting the blade assembly as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-22 12:06 Wind Technology Testing Center - Boston 3 of 7 Wind Technology Testing Center - Boston

142

Facility Representative Program: 2010 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Facility Representative Workshop 10 Facility Representative Workshop May 12 - 13, 2010 Las Vegas, NV Facility Rep of the Year Award | Attendees | Summary Report Workshop Agenda and Presentations Day 1: Wednesday, May 12, 2010 8:00 a.m. Opening Remarks James Heffner, Facility Representative Program Manager Earl Hughes, Safety System Oversight Program Manager Office of Nuclear Safety Policy and Assistance Office of Health, Safety and Security 8:15 a.m. Welcome from the Nevada Site Office John Mallin, Deputy Assistant Manager for Site Operations Nevada Site Office 8:30 a.m. Workshop Keynote Address Todd Lapointe Chief of Nuclear Safety Central Technical Authority Staff 9:15 a.m. Facility Representative and Safety System Oversight Award Ceremony James Heffner, Facility Representative Program Manager

143

Facility Representative Program: 2007 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Facility Representative Workshop 7 Facility Representative Workshop May 15 - 17, 2007 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 15, 2007 8:00 a.m. Opening Remarks Joanne Lorence, Facility Representative Program Manager 8:15 a.m. Welcome from the Nevada Site Office Gerald Talbot, Manager, Nevada Site Office 8:30 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:45 a.m. Keynote Address - Safety Oversight Perspective and Expectations Glenn Podonsky, Chief Health, Safety and Security Officer, Office of Health, Safety and Security 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board,

144

Facility Representative Program: 2001 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Facility Representative Workshop 1 Facility Representative Workshop May 15 - 17, 2001 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 15, 2001 Theme: Program Successes and Challenges 8:00 a.m. - Logistics Announcements & Opening Remarks - Joe Arango, Facility Representative Program Manager 8:15 a.m. - Welcome - Debbie Monette, Assistant Manager for National Security, Nevada Operations Office 8:30 a.m. - Keynote Address - Ralph Erickson, National Nuclear Security Administration 9:00 a.m.- DOE Facility Representative of the Year Presentation - Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board 9:30 a.m. - Break 9:50 a.m. - Program Summary - Joe Arango 10:10 a.m. - Management Panel/Questions and Answers

145

EOR databank assembled  

Science Conference Proceedings (OSTI)

Enhanced oil recovery (EOR) technology has progressed rapidly in the last few years, and a unique situation is now at hand. The Bartlesville Energy Technology Center (BETC) of the Department of Energy has supported research to survey and collect existing, publicly available data on oil reservoirs, to indentify those reservoirs amendable to EOR technology. The data from these efforts act as a broad base from which simplified models may be derived to predict the amounts of oil reserves technically and economically recoverable by EOR techniques. BETC also has been involved in 2 programs related to EOR technology - the enhanced oil recovery cost-sharing program, and the tertiary incentive crude oil program. These 2 programs have achieved the largest accumulation of data on EOR projects assembled in one place. The data will be used to improve the predictability of the simplified models; this improved predictability, it is hoped, will promote more widespread use for EOR technology and eventually reduce the risk involved in applying this technology to new areas such as the Northeast.

Ray, R.M.

1981-10-01T23:59:59.000Z

146

Drive piston assembly for a valve actuator assembly  

DOE Patents (OSTI)

A drive piston assembly is provided that is operable to selectively open a poppet valve. The drive piston assembly includes a cartridge defining a generally stepped bore. A drive piston is movable within the generally stepped bore and a boost sleeve is coaxially disposed with respect to the drive piston. A main fluid chamber is at least partially defined by the generally stepped bore, drive piston, and boost sleeve. First and second feedback chambers are at least partially defined by the drive piston and each are disposed at opposite ends of the drive piston. At least one of the drive piston and the boost sleeve is sufficiently configured to move within the generally stepped bore in response to fluid pressure within the main fluid chamber to selectively open the poppet valve. A valve actuator assembly and engine are also provided incorporating the disclosed drive piston assembly.

Sun, Zongxuan (Troy, MI)

2010-02-23T23:59:59.000Z

147

Facility Representative Program: 2008 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

Sherman Chao, LSO Conduct of Operations Improvements at K Basins Dennis Humphreys, RL Molten Salt Reactor Experiment (MSRE) facility lessons learned Charlie Wright, ORO...

148

Facility Representative Program: 2005 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

Sharing of Good Practices and Lessons Learned (4) Inadvertent Startup of Electric Centrifuge at the Weapon Evaluation Test Lab Joyce Arviso-Benally, SSO Facility Rep...

149

Facility Representative Program: 2012 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2012 Las Vegas, NV Agenda | Presentations | SSO Annual Award | Pictures | Summary Report 2011 Facility Representative of the Year Award 2011 WINNER: Congratulations to Bradley...

150

Public Assembly | Open Energy Information  

Open Energy Info (EERE)

Assembly Assembly Jump to: navigation, search Building Type Public Assembly Definition Buildings in which people gather for social or recreational activities, whether in private or non-private meeting halls. Sub Categories social or meeting (e.g. community center, lodge, meeting hall, convention center, senior center); recreation (e.g. gymnasium, health club, bowling alley, ice rink, field house, indoor racquet sports); entertainment or culture (e.g. museum, theater, cinema, sports arena, casino, night club); library; funeral home; student activities center; armory; exhibition hall; broadcasting studio; transportation terminal References EIA CBECS Building Types [1] References ↑ EIA CBECS Building Types U.S. Energy Information Administration (Oct 2008)

151

Cooling assembly for fuel cells  

DOE Patents (OSTI)

A cooling assembly for fuel cells having a simplified construction whereby coolant is efficiently circulated through a conduit arranged in serpentine fashion in a channel within a member of such assembly. The channel is adapted to cradle a flexible, chemically inert, conformable conduit capable of manipulation into a variety of cooling patterns without crimping or otherwise restricting of coolant flow. The conduit, when assembled with the member, conforms into intimate contact with the member for good thermal conductivity. The conduit is non-corrodible and can be constructed as a single, manifold-free, continuous coolant passage means having only one inlet and one outlet.

Kaufman, Arthur (West Orange, NJ); Werth, John (Princeton, NJ)

1990-01-01T23:59:59.000Z

152

Fuel assembly for nuclear reactors  

DOE Patents (OSTI)

A new and improved fuel assembly is formed to minimize the amount of parasitic structural material wherein a plurality of hollow tubular members are juxtaposed to the fuel elements of the assembly. The tubular members may serve as guide tubes for control elements and are secured to a number of longitudinally spaced grid members along the fuel assembly. The grid members include means thereon engaging each of the fuel elements to laterally position the fuel elements in a predetermined array. Openings in the bottom of each hollow member serve as a shock absorber to cushion shock transmitted to the structure when the control elements are rapidly inserted in their corresponding tubular members.

Creagan, Robert J. (Pitcairn, PA); Frisch, Erling (Pittsburgh, PA)

1977-01-01T23:59:59.000Z

153

NREL: Photovoltaics Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL's world-class research facilities provide the venue for innovative advances in photovoltaic technologies and applications. These facilities within the National Center for Photovoltaics (NCPV) serve both multi-use and dedicated-use functions. We encourage our research colleagues in industry, universities, and other laboratories to pursue opportunities in working with our staff in these facilities. Dedicated-Use Facilities Photo of a red-hot coil glowing inside a round machine. Research within these facilities focuses on targeted areas of interest that require specific tools, techniques, or unique capabilities. Our two main dedicated-use facilities are the following: Outdoor Test Facility (OTF) OTF researchers study and evaluate advanced or emerging PV technologies

154

Assembly of the PLT device  

SciTech Connect

The assembly of the PLT device began in June 1974 with a preassembly of the mechanical structure at a remote site. The preassembly sequence incorporated final fabrication procedures with an initial staging operation. This successful staging/fabrication procedure proved to be an invaluable asset when the final assembly was started in August 1974. The assembly continued with the initial reassembly of the previously tested structural components at the final machine site. Construction was interrupted at several points to allow for toroidal field coil, vacuum vessel, and poloidal coil installation. Two phases of toroidal field coil power tests were included in the assembly sequence prior to, and just after the vacuum vessel insertion. (auth)

Marino, R.

1975-11-01T23:59:59.000Z

155

Additive assembly of digital materials  

E-Print Network (OSTI)

This thesis develops the use of additive assembly of press-fit digital materials as a new rapid-prototyping process. Digital materials consist of a finite set of parts that have discrete connections and occupy discrete ...

Ward, Jonathan (Jonathan Daniel)

2010-01-01T23:59:59.000Z

156

Nuclear fuel assembly spacer  

Science Conference Proceedings (OSTI)

In a fuel assembly for a nuclear reactor including a plurality of elongated elements, a spacer is described for retaining the elements in lateral position. The spacer consists of: an array of laterally positioned, cojoined tubular ferrules, each of the ferrules providing a passage for one of the elements, laterally oriented leaf spring members, each of the spring members spanning two adjacent ones of the ferrules and extending therein to engage and laterally support the elements extending through the adjacent ferrules, facing sides of the adjacent ferrules being formed with cutouts to receive and support the spring member. The sides of the ferrules opposite the facing sides are formed with openings to receive and restrain the ends of the spring member, the spring member being formed with a generally V-shaped central portion with an apex extending toward the adjacent sides of the adjacent ferrules whereby in the absence of elements through the adjacent ferrules the central portion contacts the adjacent sides to provide a preload on the spring member and limit the amount of projection of the spring member into the ferrules whereby the insertion of the elements through the ferrules is facilitated. The central portion of the spring member is unrestrained in the presence of the elements through the ferrules, the spring member having left and right arms extending outward from the V-shaped central portion, each of the arms including a relatively long center portion for contacting a respective one of the elements. A shorter end portion is angled toward the ferrules and a tab of reduced height at the end of each arm engaging a respective one of the openings whereby the resulting shoulders at the ends of the spring member engage the inner surface of the ferrules adjacent the openings to laterally locate and retain the spring member.

Johanssen, E.B.; Matzner, B.

1986-02-18T23:59:59.000Z

157

Wafer scale micromachine assembly method  

SciTech Connect

A method for fusing together, using diffusion bonding, micromachine subassemblies which are separately fabricated is described. A first and second micromachine subassembly are fabricated on a first and second substrate, respectively. The substrates are positioned so that the upper surfaces of the two micromachine subassemblies face each other and are aligned so that the desired assembly results from their fusion. The upper surfaces are then brought into contact, and the assembly is subjected to conditions suited to the desired diffusion bonding.

Christenson, Todd R. (Albuquerque, NM)

2001-01-01T23:59:59.000Z

158

Facility Representative Program: Facility Representative Program Sponsors  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program Sponsors Facility Representative Program Sponsors There are 29 Facility Representative Program Sponsors Office Name Title E-Mail Phone ASO Larry Pendexter ES&H Div Dir (Argonne) larry.pendexter@ch.doe.gov 630-252-1485 BHSO Bob Desmarais Operations Management Division Director desmarai@bnl.gov 631-344-5434 CBFO Glenn Gamlin Facility Representative Supervisor glenn.gamlin@wipp.ws 575-234-8136 CBFO Casey Gadbury Operations Manager casey.gadbury@wipp.ws 575-234-7372 FSO Mark Bollinger Deputy Manager Mark.Bollinger@ch.doe.gov 630-840-8130 FSO John Scott FR Team Lead john.scott@ch.doe.gov 630-840-2250 HS-30 James O'Brien Director, Office of Nuclear Safety James.O'Brien@hq.doe.gov 301-903-1408 HS-32 Earl Hughes Facility Representative Program Manager Earl.Hughes@hq.doe.gov 202-586-0065

159

User Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

USER PORTAL USER PORTAL BTRICBuilding Technologies Research Integration Center CNMSCenter for Nanophase Materials Sciences CSMBCenter for Structural Molecular Biology CFTFCarbon Fiber Technology Facility HFIRHigh Flux Isotope Reactor MDF Manufacturing Demonstration Facility NTRCNational Transportation Research Center OLCFOak Ridge Leadership Computing Facility SNSSpallation Neutron Source Keeping it fresh at the Spallation Neutron Source Nanophase material sciences' nanotech toolbox Home | User Facilities SHARE ORNL User Facilities ORNL is home to a number of highly sophisticated experimental user facilities that provide unmatched capabilities to the broader scientific community, including a growing user community from universities, industry, and other laboratories research institutions, as well as to ORNL

160

NREL: Wind Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Our facilities are designed to meet the wind industry's critical research needs with state-of-the-art design and testing facilities. NREL's unique and highly versatile facilities at the National Wind Technology Center offer research and analysis of wind turbine components and prototypes rated from 400 watts to 3 megawatts. Satellite facilities support the growth of wind energy development across the United States. National Wind Technology Center Facilities Our facilities are contained within a 305-acre area that comprises field test sites, test laboratories, industrial high-bay work areas, machine shops, electronics and instrumentation laboratories, and office areas. In addition, there are hundreds of test articles and supporting components such as turbines, meteorological towers, custom test apparatus, test sheds,

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FACET User Facility  

NLE Websites -- All DOE Office Websites

AD SLACPortal > Accelerator Research Division > FACET User Facility AD SLACPortal > Accelerator Research Division > FACET User Facility Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content

162

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2005 [Facility News] October 15, 2005 [Facility News] Room to Share-New Guest Facility Ready for Users at North Slope of Alaska Bookmark and Share In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. To alleviate crowded conditions at its research facilities on the North Slope of Alaska (NSA) site in Barrow, ARM operations staff recently completed the installation of a new Guest Instrument Facility. Similar to the platform at the Atqasuk site, the facility consists of two insulated shipping containers mounted on pilings, with a mezzanine to accommodate

163

Government Facilities Segment Analysis  

Science Conference Proceedings (OSTI)

Federal, state, and local governments own or lease an estimated 1.2 million buildings and facilities in the United States. These facilities are an important -- and often overlooked -- customer segment for all energy and energy service providers.

1998-12-19T23:59:59.000Z

164

Geothermal component test facility  

DOE Green Energy (OSTI)

A description is given of the East Mesa geothermal facility and the services provided. The facility provides for testing various types of geothermal energy-conversion equipment and materials under field conditions using geothermal fluids from three existing wells. (LBS)

Not Available

1976-04-01T23:59:59.000Z

165

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Primary Systems Infrastructure High Performance Storage Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Facilities and Capabilities...

166

MML Microscopy Facility  

Science Conference Proceedings (OSTI)

The MML Electron Microscopy Facility consists of three transmission electron microscopes (TEM), three scanning electron microscopes (SEM), a ...

2013-06-11T23:59:59.000Z

167

Photon Sciences | Navigation | Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities NSLS About NSLS Accelerator Activity Report Experimental Systems Machine Status & History Operations & Engineering Operating Schedules Ring Parameters NSLS Ops:...

168

Idaho Site Nuclear Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Nuclear Facilities Idaho Idaho National Laboratorys (INL) Idaho Closure Project (ICP) This page was last updated on May 16...

169

Facilities and Instruments  

Science Conference Proceedings (OSTI)

... The EL Facilities listed here are available for cooperative or independent research, typically on a cost reimbursable basis. ...

2013-03-12T23:59:59.000Z

170

Facility Representative Program: 2004 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Facility Representative Workshop 4 Facility Representative Workshop May 18 - 20, 2004 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 18, 2004 Theme: Program Successes and Challenges 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathy Carlson, Nevada Site Office Manager 8:30 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy Deputy Secretary's Remarks 8:40 a.m. Keynote Address - NNSA Evaluation of Columbia Accident Investigation Board Report Brigadier General Ronald J. Haeckel, Principal Assistant Deputy Administrator for Military Applications, NNSA Other Information: NASA’S Columbia Accident Investigation Board Report

171

Facility Representative Program: 2006 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Facility Representative Workshop 6 Facility Representative Workshop May 16 - 19, 2006 Knoxville, Tennessee Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final To view Pictures, scroll the mouse over the Picture icon To view Presentations, Picture Slideshows and Video, click on the icon Day 1: Tuesday, May 16, 2006 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome from Oak Ridge Office Gerald Boyd, Manager, Oak Ridge Office 8:25 a.m. Welcome from Y-12 Site Office Theodore Sherry, Manager, Y-12 Site Office 8:35 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:40 a.m. Keynote Address - Safety Oversight at Environmental Management Activities Dr. Inés Triay, Chief Operating Officer, Office of Environmental Management

172

Facility Representative Program: 2000 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

- Break 10:00 a.m. - Making Your Observations CountLeading Indicators - Mike Weis, Rocky Flats Field Office 10:45 a.m. - Facility Representative PanelQuestions and Answers (Ben...

173

NREL: Buildings Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL provides industry, government, and university researchers with access to state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency technologies and innovations. NREL engineers and researchers work closely with industry partners to research and develop advanced technologies. NREL's existing facilities have been used to test and develop many award-winning building technologies and innovations that deliver significant energy savings in buildings, and the new facilities further extend those capabilities. In addition, the NREL campus includes living laboratories, buildings that researchers and other NREL staff use every day. Researchers monitor real-time building performance data in these facilities to study energy use

174

Biomass Anaerobic Digestion Facilities and Biomass Gasification...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana) Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana)...

175

Facility Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser  

Open Energy Info (EERE)

Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate WindTurbineManufacturer FacilityStatus Coordinates D Metals D Metals D Metals Definition Small Scale Wind Valley City OH MW Northern Power Systems In Service AB Tehachapi Wind Farm AB Tehachapi Wind Farm AB Tehachapi Definition Commercial Scale Wind Coram Energy AB Energy Southern California Edison Co Tehachapi CA MW Vestas In Service AFCEE MMR Turbines AFCEE MMR Turbines AFCEE MMR Turbines Definition Commercial Scale Wind AFCEE Air Force Center for Engineering and the Environment Distributed generation net metered Camp Edwards Sandwich MA MW GE Energy In Service AG Land AG Land AG Land Definition Community Wind AG Land Energy LLC

176

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 22, 2007 [Facility News] March 22, 2007 [Facility News] GEWEX News Features Dust Data from ARM Mobile Facility Deployment Bookmark and Share Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. The February 2007 issue (Vol. 17, No. 1) of GEWEX News features early results from special observing periods of the African Monsoon Mutidisciplinary Analysis, including data obtained by the ARM Mobile Facility (AMF). The AMF was stationed in the central Sahel from January through December 2006, with the primary facility at the Niamey airport, and an ancillary site in Banizoumbou. The AMF recorded a major dust storm that passed through the area in March, and combined with simultaneous satellite

177

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 16, 2005 [Facility News] February 16, 2005 [Facility News] Mobile Facility Arrives Safe and Sound in Point Reyes Bookmark and Share Image - The ARM Mobile Facility in Point Reyes, California Image - The ARM Mobile Facility in Point Reyes, California Safe and sound at Point Reyes, the ARM Mobile Facility instrumentation is set up on the roof of a shelter until a fence is installed to keep out the curious local cattle. On February 9, the ARM Mobile Facility (AMF) withstood an accident on the way to its deployment location at Point Reyes, California. About an hour from its destination, the truck carrying the two AMF shelters packed with instrumentation and associated equipment swerved to avoid another vehicle and slid off the road and down a steep embankment. Emergency personnel soon

178

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2011 [Facility News] 22, 2011 [Facility News] Request for Proposals Now Open Bookmark and Share The ARM Climate Research Facility is now accepting applications for use of an ARM mobile facility (AMF), the ARM aerial facility (AAF), and fixed sites. Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Facility, with availability as follows: AMF2 available December 2013 AMF1 available March 2015 AAF available between June and October 2013 Fixed sites available FY2013 Priority will be given to proposals that make comprehensive use of the ARM facilities and focus on long-term goals of the DOE Office of Biological and Environmental Research. Successful proposals will be supplied all operational and logistical resources (provided at no cost to the principal

179

FUEL ASSEMBLY SHAKER TEST SIMULATION  

SciTech Connect

This report describes the modeling of a PWR fuel assembly under dynamic shock loading in support of the Sandia National Laboratories (SNL) shaker test campaign. The focus of the test campaign is on evaluating the response of used fuel to shock and vibration loads that a can occur during highway transport. Modeling began in 2012 using an LS-DYNA fuel assembly model that was first created for modeling impact scenarios. SNLs proposed test scenario was simulated through analysis and the calculated results helped guide the instrumentation and other aspects of the testing. During FY 2013, the fuel assembly model was refined to better represent the test surrogate. Analysis of the proposed loads suggested the frequency band needed to be lowered to attempt to excite the lower natural frequencies of the fuel assembly. Despite SNLs expansion of lower frequency components in their five shock realizations, pretest predictions suggested a very mild dynamic response to the test loading. After testing was completed, one specific shock case was modeled, using recorded accelerometer data to excite the model. Direct comparison of predicted strain in the cladding was made to the recorded strain gauge data. The magnitude of both sets of strain (calculated and recorded) are very low, compared to the expected yield strength of the Zircaloy-4 material. The model was accurate enough to predict that no yielding of the cladding was expected, but its precision at predicting micro strains is questionable. The SNL test data offers some opportunity for validation of the finite element model, but the specific loading conditions of the testing only excite the fuel assembly to respond in a limited manner. For example, the test accelerations were not strong enough to substantially drive the fuel assembly out of contact with the basket. Under this test scenario, the fuel assembly model does a reasonable job of approximating actual fuel assembly response, a claim that can be verified through direct comparison of model results to recorded test results. This does not offer validation for the fuel assembly model in all conceivable cases, such as high kinetic energy shock cases where the fuel assembly might lift off the basket floor to strike to basket ceiling. This type of nonlinear behavior was not witnessed in testing, so the model does not have test data to be validated against.a basis for validation in cases that substantially alter the fuel assembly response range. This leads to a gap in knowledge that is identified through this modeling study. The SNL shaker testing loaded a surrogate fuel assembly with a certain set of artificially-generated time histories. One thing all the shock cases had in common was an elimination of low frequency components, which reduces the rigid body dynamic response of the system. It is not known if the SNL test cases effectively bound all highway transportation scenarios, or if significantly greater rigid body motion than was tested is credible. This knowledge gap could be filled through modeling the vehicle dynamics of a used fuel conveyance, or by collecting acceleration time history data from an actual conveyance under highway conditions.

Klymyshyn, Nicholas A.; Sanborn, Scott E.; Adkins, Harold E.; Hanson, Brady D.

2013-05-30T23:59:59.000Z

180

PHAST (PHAGE ASSEMBLY SUITE AND TUTORIAL): A WEB-BASED GENOME ASSEMBLY TEACHING TOOL  

E-Print Network (OSTI)

PHAST (PHAGE ASSEMBLY SUITE AND TUTORIAL): A WEB-BASED GENOME as genome assembly. PHAST (Phage Assembly Suite and Tutorial) is an online set small phage genomes of their own. With PHAST, entry-level biology students learn

Campbell, A. Malcolm

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly under Surrogate Normal Conditions of Truck Transport R0.1 Fuel Assembly Shaker Test for Determining Loads on a PWR...

182

Circuit breaker lock out assembly  

DOE Patents (OSTI)

A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly S shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

Gordy, W.T.

1983-05-18T23:59:59.000Z

183

Circuit breaker lock out assembly  

Science Conference Proceedings (OSTI)

A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly "S" shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

Gordy, Wade T. (Jackson, SC)

1984-01-01T23:59:59.000Z

184

DNA-guided nanoparticle assemblies  

DOE Patents (OSTI)

In some embodiments, DNA-capped nanoparticles are used to define a degree of crystalline order in assemblies thereof. In some embodiments, thermodynamically reversible and stable body-centered cubic (bcc) structures, with particles occupying <.about.10% of the unit cell, are formed. Designs and pathways amenable to the crystallization of particle assemblies are identified. In some embodiments, a plasmonic crystal is provided. In some aspects, a method for controlling the properties of particle assemblages is provided. In some embodiments a catalyst is formed from nanoparticles linked by nucleic acid sequences and forming an open crystal structure with catalytically active agents attached to the crystal on its surface or in interstices.

Gang, Oleg; Nykypanchuk, Dmytro; Maye, Mathew; van der Lelie, Daniel

2013-07-16T23:59:59.000Z

185

Ultrasonic Assembly of Thermoplastic Parts  

SciTech Connect

Four ultrasonic methods were evaluated for assembly of experimental plastic parts for detonators: (1) welding, (2) crimping and staking, (3) insertion, and (4) reactivation of adhesives. For welding, staking and insertion, plastics with low elastic moduli, such as acrylics and polycarbonate, produced the best results. Thermosetting, hot-melt, and solution adhesives could all be activated ultrasonically to form good bonds on plastics and other materials. This evaluation indicated that thermoplastic detonator parts could be assembled ultrasonically in shorter times than by present production techniques with high bond strengths and high product acceptance rates.

Schurman, W. R.

1970-03-31T23:59:59.000Z

186

Defining the early steps in nuclear pore assembly : chromatin-associated ELYS initiates pore assembly  

E-Print Network (OSTI)

of membrane fusion 121 Figure 3.2: Cold temperaturefusion inhibitor LPC prevents FG Nups assembly into the coldfusion inhibitor LPC prevents FG Nups assembly into the cold

Rasala, Beth A.

2008-01-01T23:59:59.000Z

187

NREL: Technology Transfer - Research Facilities  

NREL's Solar Energy Research Facility is one of many world-class facilities available to public and private agencies.

188

Quantum Electrical Metrology Division Facilities  

Science Conference Proceedings (OSTI)

Microfabrication Facility Our facilities for fabrication of integrated circuits are essential to nearly all of the work in the Group. ...

2011-10-03T23:59:59.000Z

189

Policies and Procedures - Accessing Facilities  

Science Conference Proceedings (OSTI)

... of Facilities Use Agreements: Description of the facilities use agreements ... Criteria: Guidance for applicants describing essential information about ...

2013-09-24T23:59:59.000Z

190

SOURCE OF BURNUP VALUES FOR COMMERCIAL SPENT NUCLEAR FUEL ASSEMBLIES  

SciTech Connect

Waste packages are loaded with commercial spent nuclear fuel (SNF) that satisfies the minimum burnup requirements of a criticality loading curve. The burnup value assigned by the originating nuclear utility to each SNF assembly (assigned burnup) is used to load waste packages in compliance with a criticality loading curve. The burnup provided by a nuclear utility has uncertainties, so conservative calculation methods are used to characterize those uncertainties for incorporation into the criticality loading curves. Procedural safety controls ensure that the correct assembly is loaded into each waste package to prevent a misload that could create a condition affecting the safety margins. Probabilistic analyses show that procedural safety controls can minimize the chance of a misload but can not completely eliminate the possibility. Physical measurements of burnup with instrumentation in the surface facility are not necessary due to the conservative calculation methods used to produce the criticality loading curves. The reactor records assigned burnup of a commercial SNF assembly contains about two percent uncertainty, which is increased to five-percent to ensure conservatism. This five-percent uncertainty is accommodated by adjusting the criticality loading curve. Also, the record keeping methods of nuclear utilities are not uniform and the level of detail required by the NRC has varied over the last several decades. Thus, some SNF assemblies may have assigned burnups that are averages for a batch of assemblies with similar characteristics. Utilities typically have access to more detailed core-follow records that allow the batch average burnup to be changed to an assembly specific burnup. Alternatively, an additional safety margin is incorporated into the criticality loading curve to accommodate SNF assemblies with batch average burnups or greater uncertainties due to the methodology used by the nuclear utility. The utility records provide the assembly identifier, initial {sup 235}U enrichment, and time of discharge from the reactor as well as the assigned burnup, but the distribution. of burnup axially along the assembly length is not provided. The axial burnup profile is maintained within acceptable bounds by the operating conditions of the nuclear reactor and is calculated during preparations to reload a reactor, but the actual burnup profile is not measured. The axial burnup profile is important to the determination of the reactivity of a waste package, so a conservative evaluation of the calculated axial profiles for a large database of SNF has been performed. The product of the axial profile evaluation is a profile that is conservative. Thus, there is no need for physical measurement of the axial profile. The assembly identifier is legible on each SNF assembly and the utility records provide the associated characteristics of the assembly. The conservative methodologies used to determine the criticality loading curve for a waste package provide sufficient margin so that criticality safety is assured for preclosure operations even in the event of a misload. Consideration of misload effects for postclosure time periods is provided by the criticality Features, Events, and Processes (FEPs) analysis. The conservative approaches used to develop and apply the criticality loading curve are thus sufficiently robust that the utility assigned burnup is an adequate source of burnup values, and additional means of verification of assigned burnup through physical measurements are not needed.

BSC

2004-12-01T23:59:59.000Z

191

Application of hydraulically assembled shaft coupling hubs to large agitators  

SciTech Connect

This paper describes the basis for and implementation of hydraulically assembled shaft coupling hubs for large tank-mounted agitators. This modification to the original design was intended to minimize maintenance personnel exposure to ionizing radiation and also provide for disassembly capability without damage to shafts or hubs. In addition to realizing these objectives, test confirmed that the modified couplings reduced agitator shaft end runouts approximately 65%, thereby reducing bearing loads and increasing service life, a significant enhancement for a nuclear facility. 5 refs.

Murray, W.E.; Anderson, T.D. [Bechtel National, Inc., Aiken, SC (United States); Bethmann, H.K. [Westinghouse Savannah River Co., Aiken, SC (United States)

1991-12-31T23:59:59.000Z

192

Application of hydraulically assembled shaft coupling hubs to large agitators  

SciTech Connect

This paper describes the basis for and implementation of hydraulically assembled shaft coupling hubs for large tank-mounted agitators. This modification to the original design was intended to minimize maintenance personnel exposure to ionizing radiation and also provide for disassembly capability without damage to shafts or hubs. In addition to realizing these objectives, test confirmed that the modified couplings reduced agitator shaft end runouts approximately 65%, thereby reducing bearing loads and increasing service life, a significant enhancement for a nuclear facility. 5 refs.

Murray, W.E.; Anderson, T.D. (Bechtel National, Inc., Aiken, SC (United States)); Bethmann, H.K. (Westinghouse Savannah River Co., Aiken, SC (United States))

1991-01-01T23:59:59.000Z

193

Simulated nuclear reactor fuel assembly  

DOE Patents (OSTI)

An apparatus for electrically simulating a nuclear reactor fuel assembly. It includes a heater assembly having a top end and a bottom end and a plurality of concentric heater tubes having electrical circuitry connected to a power source, and radially spaced from each other. An outer target tube and an inner target tube is concentric with the heater tubes and with each other, and the outer target tube surrounds and is radially spaced from the heater tubes. The inner target tube is surrounded by and radially spaced from the heater tubes and outer target tube. The top of the assembly is generally open to allow for the electrical power connection to the heater tubes, and the bottom of the assembly includes means for completing the electrical circuitry in the heater tubes to provide electrical resistance heating to simulate the power profile in a nuclear reactor. The embedded conductor elements in each heater tube is split into two halves for a substantial portion of its length and provided with electrical isolation such that each half of the conductor is joined at one end and is not joined at the other end.

Berta, Victor T. (Idaho Falls, ID)

1993-01-01T23:59:59.000Z

194

Valve assembly for inflatable packer  

Science Conference Proceedings (OSTI)

This patent describes a valve assembly for controlling the flow of fluid from within casing into a bladder element of an inflatable packer for use in a wellbore. The bladder element has bladder port means. The valve assembly is mountable within a single cavity in a body member in the wall of casing or a casing coupling. The body member has casing port means communicating with the cavity for communicating casing fluid to the bladder port means so that the casing fluid can flow through the bladder port means to inflate the bladder element and the body member having overpressure port means communicating with the cavity for communicating part of the fluid flowing into the bladder element back to the cavity and to the valve assembly. The valve assembly comprises: control piston means movably mounted within the cavity, restraint means for insuring that the control piston means initially moves only when the pressure of the casing fluid reaches a predetermined level, and closing piston means movably mounted within the cavity and responsive to the pressure of the fluid in the bladder element, and the control piston means and the closing piston movable about stem means disposed in the cavity.

Stringfellow, W.D.

1987-12-08T23:59:59.000Z

195

Radial blanket assembly orificing arrangement  

DOE Patents (OSTI)

A nuclear reactor core for a liquid metal cooled fast breeder reactor is described in which means are provided for increasing the coolant flow through the reactor fuel assemblies as the reactor ages by varying the coolant flow rate with the changing coolant requirements during the core operating lifetime. (auth)

Patterson, J.F.

1975-07-01T23:59:59.000Z

196

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2009 [Facility News] July 31, 2009 [Facility News] President of the Regional Government Speaks at Opening Ceremony for Mobile Facility in the Azores Bookmark and Share Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. On June 30, officials from the Regional Government of the Azores recognized the deployment of the ARM Mobile Facility on Graciosa Island during an official opening ceremony held at the site. Notable among the participants

197

BNL | Accelerator Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Test Facility Accelerator Test Facility Home Core Capabilities Photoinjector S-Band Linac Laser Systems CO2 Laser Nd:Yag Laser Beamlines Beamline Simulation Data Beamline Parameters Beam Diagnostics Detectors Beam Schedule Operations Resources Fact Sheet (.pdf) Image Library Upgrade Proposal (.pdf) Publications ES&H Experiment Start-up ATF Handbook Laser Safety Collider-Accelerator Dept. C-AD ES&H Resources Staff Users' Place Apply for Access ATF photo ATF photo ATF photo ATF photo ATF photo A user facility for advanced accelerator research The Brookhaven Accelerator Test Facility (ATF) is a proposal driven, steering committee reviewed facility that provides users with high-brightness electron- and laser-beams. The ATF pioneered the concept of a user facility for studying complex properties of modern accelerators and

198

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

199

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 7, 2011 [Facility News] April 7, 2011 [Facility News] Review Panel States ARM Facility "Without Peer" Bookmark and Share Every three years, DOE Office of Science user facilities undergo a review to evaluate their effectiveness in contributing to their respective science areas. The latest ARM Facility review was conducted in mid-February by a six-member review panel led by Minghua Zhang of Stony Brook University. Notably, in a debriefing following the review, the panel stated that ARM was a "world class facility without peer." The panel convened in Ponca City, Oklahoma, near ARM's Southern Great Plains site to conduct their review. Their first agenda item was an SGP site tour, which provided a realtime example of the scope and expertise of site operations and included a demonstration of the site's newly

200

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2010 [Facility News] 8, 2010 [Facility News] Europeans Keen to Hear About Effects of Dust Using Data from Africa Bookmark and Share In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. Researcher Xiaohong Liu from Pacific Northwest National Laboratory was

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Team Scouts Graciosa Island for 2009 Mobile Facility Deployment Site Bookmark and Share A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens Indications from a scouting trip by the ARM Mobile Facility (AMF) science and operations management team are that an excellent site for the 2009 deployment may have been found. From April 8 through April 16, the team traveled to Graciosa Island in the Azores to scout sites for the Clouds, Aerosol, and Precipitation in the Marine Boundary Layer (CAP-MBL) field

202

Integrated Facilities Disposition Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Facilities Disposition Program Tank Waste Corporate Board Meeting at ORNL Sharon Robinson Dirk Van Hoesen Robert Jubin Brad Patton July 29, 2009 2 Managed by UT-Battelle for the U.S. Department of Energy The Integrated Facility Disposition Program (IFDP) addresses the remaining EM Scope at both ORNL and Y-12 Cost Range: $7 - $14B Schedule: 26 Years 3 Managed by UT-Battelle for the U.S. Department of Energy Scope of work * Treatment and disposition of legacy materials and waste * D&D 327 (1.5 M ft 2 ) excess facilities generating >2 M yd 3 debris * Soil and groundwater remedial actions generating >1 M yd 3 soils * Facilities surveillance and maintenance * Reconfiguration of waste management facilities * Ongoing waste management operations * Project management

203

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2013 [Facility News] 4, 2013 [Facility News] Work Cut Out for ARM Science Board Bookmark and Share With a new fixed site on the horizon in the Azores, a third ARM Mobile Facility gearing up for action in the Arctic, and more aircraft probes and sensors than scientists can shake a stick at, the ARM Facility continues to expand its considerable suite of assets for conducting climate research. Along with this impressive inventory comes the responsibility to ensure the Facility is supporting the highest-value science possible. Enter the ARM Science Board. This eleven-member group annually reviews complex proposals for use of the ARM mobile and aerial facilities. To maintain excellence and integrity in the review process, each member serves a renewable term of two years, with membership updated annually.

204

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2011 [Facility News, Publications] 8, 2011 [Facility News, Publications] Journal Special Issue Includes Mobile Facility Data from Germany Bookmark and Share The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. In 2007, the ARM Mobile Facility participated in one of the most ambitious field studies ever conducted in Europe-the Convective and Orographically Induced Precipitation Study (COPS). Now, 21 papers published in a special issue of the Quarterly Journal of the Royal Meteorological Society demonstrate that the data collected during COPS are providing new insight into: the key chemical and physical processes leading to convection initiation and to the modification of precipitation by orography;

205

WIPP - Public Reading Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Reading Facilities/Electronic Reading Facilities The Freedom of Information Act (FOIA) and Electronic FOIA (E-FOIA) require that various specific types of records, as well as various other records, be maintained in public reading facilities. Before you submit a FOIA request, we recommend you contact or visit the appropriate public reading facility to determine if the records you are seeking have already been released. The U.S. Department of Energy (DOE), as well as other related DOE sites, have established home pages on the Internet with links to other web sites. If you determine a specific facility might have records in which you are interested, requests for those records can be made directly to the public reading rooms identified below. Copying of records located in the public reading rooms must be made by the staff of those facilities.

206

De-caf-einated : life without chromatin assembly factors  

E-Print Network (OSTI)

SACCHAROMYCES CEREVISIAE CHROMATIN ASSEMBLY FACTORS THAT ACTSaccharomyces cerevisiae chromatin- assembly factors thatSaccharomyces cerevisiae chromatin-assembly factors that act

Kats, Ellen Simona

2006-01-01T23:59:59.000Z

207

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites

banner banner Home | People | Site Index Atmospheric Radiation Measurement Climate Research Facility US Department of Energy About Science Campaigns Sites Instruments Measurements Data News Publications Education Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings Propose a Campaign Submitting Proposals: Guidelines Featured Campaigns Campaign Data List of Campaigns Aerial Facility Eastern North Atlantic Mobile Facilities North Slope of Alaska Southern Great Plains Tropical Western Pacific Location Table Contacts Instrument Datastreams Value-Added Products PI Data Products Field Campaign Data Related Data

208

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 30, 2008 Facility News Site Operations Centralized Through New Tracking System Bookmark and Share Tracking over 300 instrument systems distributed around the world is a...

209

Wind Manufacturing Facilities  

Energy.gov (U.S. Department of Energy (DOE))

America's wind energy industry supports a growing domestic industrial base. Check out this map to find manufacturing facilities in your state.

210

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

TR-081.2 iii Abstract This report provides a short description of the Atmospheric Radiation Measurement (ARM) Climate Research Facility microwave radiometer (MWR) Retrieval...

211

BTRIC - User Facility - ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

whole-building and community integration, improved energy management in buildings and industrial facilities during their operational phase, and market transformations from old...

212

Superalloy Research Facilities  

Science Conference Proceedings (OSTI)

Feb 8, 2007 ... This directory provides a list of links to superalloy research facilities and programs around the world. Two formats of the information are...

213

Lighting Systems Test Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement equipment with light beam Lighting Systems Test Facilities NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be...

214

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Mapping It Up With Google Bookmark and Share "Thumbtacks" help ARM website users identify where the ARM sites are, including the ARM Mobile Facility deployments. "Thumbtacks" help...

215

Facility Survey & Transfer  

Energy.gov (U.S. Department of Energy (DOE))

As DOE facilities become excess, many that are radioactively and/or chemically contaminated will become candidate for transfer to DOE-EM for deactivation and decommissioning.

216

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

features the familiar faces of Professor Polar Bear, Teacher Turtle, and PI Prairie Dog (each representing an ARM Climate Research Facility site), but now provides easier...

217

Facilities for Calibration  

Science Conference Proceedings (OSTI)

... Our state-of-the-art property measurements require extensive calibration facilities of equal quality. Regular calibrations are essential for realistic ...

2014-01-03T23:59:59.000Z

218

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 30, 2007 Facility News New Radar Wind Profiler Joins AMF Instrument Suite in Germany The 1290 MHz wind profiler (foreground) joins the eddy correlation system (background)...

219

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 2, 2013 Facility News 2014 Funding Opportunity Available for Early Career Scientists The U.S. Department of Energy's Office of Science is now accepting research...

220

User Facilities - Learn More  

NLE Websites -- All DOE Office Websites (Extended Search)

Shared Research Equipment (ShaRE) The Shared Research Equipment (ShaRE) User Facility at the Oak Ridge National Laboratory (ORNL) is one of three Electron Beam...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 15, 2008 Facility News User Group Provides Recommendations for Data Archive Improvements Routine data from the ARM sites and ARM-sponsored field campaigns are stored in...

222

User Facilities - Learn More  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Source Search by Equipment or Process User Portal Quick Links ORNL home User facility contacts ORNL Guest House Open Helpful Travel Information Learn More User...

223

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 31, 2008 Facility News Breakthrough User Interface Delivers Statistical Views of Data With its "drill-down" preview feature, the Statistical Browser is the first example...

224

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

instruments and equipment, as well as local facilities such as hospitals, groceries, and gas stations. Next steps will involve such items as securing access to power from nearby...

225

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2004 Facility News New Instrumentation on Proteus Aircraft Tested This fall, the ARM-Unmanned Aerospace Vehicle Program-specifically, the Proteus aircraft-is...

226

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15 and 21 will remain intact, along with the Central Facility (C1) near Lamont. Instrumentation at the remaining sites will be consolidated into the new, smaller footprint....

227

ARM - SGP Boundary Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities-located at Hillsboro, Kansas; Morris, Oklahoma; Purcelll, Oklahoma and Vici, Oklahoma (north, east, south and west, respectively)-marked the approximate midpoint of...

228

HYTEST Phase I Facility Commissioning and Modeling  

DOE Green Energy (OSTI)

The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

2009-09-01T23:59:59.000Z

229

Integrated Radiation Transport and Thermo-Mechanics Simulation of a PWR Assembly  

SciTech Connect

The Advanced Multi-Physics (AMP) Nuclear Fuel Performance code (AMPFuel) is focused on predicting the temperature and strain within a nuclear fuel assembly to evaluate the performance and safety of existing and advanced nuclear fuel bundles within existing and advanced nuclear reactors. AMPFuel was extended to include an integrated nuclear fuel assembly capability for (one-way) coupled radiation transport and nuclear fuel assembly thermo-mechanics. This capability is the initial step towards incorporating an improved predictive nuclear fuel assembly modeling capability to accurately account for source terms, such as the neutron flux distribution, coolant conditions, and assembly mechanical stresses, of traditional (single-pin) nuclear fuel performance simulation. AMPFuel was used to model an entire 17 x 17 Pressurized Water Reactor (PWR) fuel assembly with many of the features resolved in three dimensions (for thermo-mechanics and/or neutronics), including the fuel, gap, and cladding of each of the 264 fuel pins, the 25 guide tubes, top and bottom structural regions, and the upper and lower (neutron) reflector regions. The final full-assembly calculation was executed on Jaguar (Cray XT5) at the Oak Ridge Leadership Computing Facility using 40,000 cores in under 10 hours to model over 162 billion degrees of freedom for 10 loading steps.

Clarno, Kevin T [ORNL; Hamilton, Steven P [ORNL; Philip, Bobby [ORNL; Sampath, Rahul S [ORNL; Allu, Srikanth [ORNL; Berrill, Mark A [ORNL; Barai, Pallab [ORNL; Banfield, James E [ORNL

2012-01-01T23:59:59.000Z

230

Transplanting assembly of individual carbon nanotubes  

E-Print Network (OSTI)

Handling and assembling individual nanostructures to bigger scale systems such as MEMS have been the biggest challenge. A deterministic assembly of individual carbon nanotubes by transplanting them to MEMS structures is ...

Kim, Soohyung

2009-01-01T23:59:59.000Z

231

Facility Representative Program: DOE Facility Representatives  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP PADU PORTS ANL WVDP MOAB SFO LFO LAFO NFO SRFO RL PNSO ORP ID NPO-PX FSO NBL NPO-Y12 ORO OSO SPRU BHSO PSO SR SR NA26 DOE Facility Site Map Please help keep this...

232

Biological Sciences Facility and Computational Sciences Facility  

E-Print Network (OSTI)

on PNNL's campus since 1997. Combined, the two facilities house about 300 staff who support PNNL replacing laboratory and office space PNNL has been using on the south end of the nearby Hanford Site financed the new buildings and is leasing them to Battelle, which operates PNNL for DOE. #12;January 2010

233

Graph theoretic approach to parallel gene assembly  

Science Conference Proceedings (OSTI)

We study parallel complexity of signed graphs motivated by the highly complex genetic recombination processes in ciliates. The molecular gene assembly operations have been modeled by operations of signed graphs, i.e., graphs where the vertices have a ... Keywords: Double-split graphs, Gene assembly, Local complement, Parallel assembly, Perfect matching, Signed graphs, Split graphs

Tero Harju; Chang Li; Ion Petre

2008-11-01T23:59:59.000Z

234

Development of Correlations for Pressure Loss/Drop Coefficients Obtained From Flow Testing of Fuel Assemblies in Framatome ANP's PHTF  

SciTech Connect

Thermal-hydraulic analyses of pressurized water reactor (PWR) and boiling water reactor (BWR) fuel assemblies are generally performed for either assembly thermal-hydraulic design, thermal-hydraulic compatibility evaluation, or cycle licensing thermal-hydraulic characterization. A key issue in all cases is the hydraulic resistance characterization of the assembly in which the assembly, its components and support plates, etc., are represented by their respective pressure loss and pressure drop coefficients. These hydraulic coefficients can be determined by single-phase flow testing in an experimental facility such as the Framatome ANP Portable Hydraulic Test Facility (PHTF) located at Richland Test Facilities (RTF) in Richland, WA. The goal of this paper is to present a uniform and consistent methodology for the development of coefficient correlations from data obtained from single phase pressure drop testing of PWR and BWR fuel assemblies and their components performed in the PHTF. This methodology reflects the years of accumulated experience from an existing facility with an ongoing test program. (authors)

Madni, Imtiaz K.; Stephens, Lance G.; Turner, Dave M. [Framatome ANP Inc. (United States)

2002-07-01T23:59:59.000Z

235

Facility location: distributed approximation  

Science Conference Proceedings (OSTI)

In this paper, we initiate the study of the approximability of the facility location problem in a distributed setting. In particular, we explore a trade-off between the amount of communication and the resulting approximation ratio. We give a distributed ... Keywords: distributed approximation, facility location, linear programming, primal-dual algorithms

Thomas Moscibroda; Rogert Wattenhofer

2005-07-01T23:59:59.000Z

236

Lunch & Learn Facilities &  

E-Print Network (OSTI)

reimbursements to the University for costs incurred in support of sponsored projects Sponsor perspective: F&A represent the sponsor's fair share of facilities and administration as it relates to total project costs 7Lunch & Learn Facilities & Administrative (F&A) Costs #12;Today's Agenda What are F&A Costs? How

McQuade, D. Tyler

237

Argonne Leadership Computing Facility  

E-Print Network (OSTI)

on constant Q surface. (Credit: Anurag Gupta/GE Global) www.alcf.anl.gov The Leadership Computing Facility Division operates the Argonne Leadership Computing Facility -- the ALCF -- as part of the U.S. Department.......................................................................................... 63 2010 ALCF Projects ............................................................................ 64

Kemner, Ken

238

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] High-Speed Internet Deflects Information Overload Bookmark and Share Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. A little more room in the internet link at the ARM Southern Great Plains site is providing needed relief to the crowded lines that keep data flowing from the site. In July 2007, the internet service from the SGP Central Facility was switched to a higher speed (6 megabits) link, increasing the

239

BNL | Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven's Research Facilities Brookhaven's Research Facilities Tools of Discovery Brookhaven National Lab excels at the design, construction, and operation of large-scale, cutting-edge research facilities-some available nowhere else in the world. Each year, thousands of scientists from laboratories, universities, and industries around the world use these facilities to delve into the basic mysteries of physics, chemistry, biology, materials science, energy, and the environment-and develop innovative applications that arise, sometimes at the intersections of these disciplines. construction Brookhaven Lab is noted for the design, construction and operation of large-scale, cutting-edge research facilities that support thousands of scientists worldwide. RHIC tunnel Relativistic Heavy Ion Collider

240

ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2010 [Facility News] 15, 2010 [Facility News] Water Vapor Network at SGP Site Goes Offline Bookmark and Share Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. After nearly eleven years, the Single Frequency GPS Water Vapor Network field campaign at the ARM Southern Great Plains (SGP) site came to a close on July 1, 2010. Installed between 1999 and 2000, this network consisted of 24 GPS stations operating within an 8-kilometer radius around the SGP Central Facility near Lamont, Oklahoma. Developed to function as a single instrument, the network simultaneously measured "slant water vapor" in

242

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2005 [Facility News] 30, 2005 [Facility News] Coastal Clouds Field Campaign Takes Off in July Bookmark and Share The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. Since March 2005, the ARM Mobile Facility (AMF) has been at Point Reyes National Seashore in northern California for the Marine Stratus Radiation, Aerosol, and Drizzle Intensive Operational Period. The goals of this 6-month field campaign are to collect data from cloud/aerosol interactions and to improve understanding of cloud organization that is often associated

243

NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

244

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

25, 2013 [Education, Facility News] 25, 2013 [Education, Facility News] Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Bookmark and Share Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. School break means vacation, and around Cape Cod, that often means a trip to the seashore. On April 17, families looking for fun and educational outdoor activities spent several hours at Cape Cod National Seashore's

245

ARM - NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

246

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2004 [Facility News] May 15, 2004 [Facility News] Mid-latitude Cirrus Cloud Experiment Underway Bookmark and Share NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. In late April, scientific collaborators at the National Aeronautics and Space Administration (NASA) carried out two high-altitude flights over the ARM Climate Research Facility Southern Great Plains (SGP) central facility. The purpose of these flights was to use a new suite of cloud property probes on the WB-57F aircraft to more accurately characterize the properties of mid-latitude cirrus clouds-which are composed solely of ice crystals-than has previously been possible. Eight flights over the SGP central facility were originally planned, but the expected cirrus clouds

247

FACILITY SAFETY (FS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACILITY SAFETY (FS) FACILITY SAFETY (FS) OBJECTIVE FS.1 - (Core Requirement 7) Facility safety documentation in support of SN process operations,is in place and has been implemented that describes the safety envelope of the facility. The, safety documentation should characterize the hazards/risks associated with the facility and should, identify preventive and mitigating measures (e.g., systems, procedures, and administrative, controls) that protect workers and the public from those hazards/risks. (Old Core Requirement 4) Criteria 1. A DSA has been prepared by FWENC, approved by DOE, and implemented to reflect the SN process operations in the WPF. (10 CFR 830.200, DOE-STD-3009-94) 2. A configuration control program is in place and functioning such that the DSA is

248

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2009 [Facility News] , 2009 [Facility News] Mobile Facility Begins Marine Cloud Study in the Azores Bookmark and Share Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Extended deployment will obtain seasonal statistics to improve climate models Today marks the beginning of a 20-month field campaign on Graciosa Island in the Azores to study the seasonal life cycle of marine clouds and how they modulate the global climate system. Sponsored by the U.S. Department

249

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2009 [Facility News] 7, 2009 [Facility News] Town Hall Meeting at AGU 2009 Fall Meeting Bookmark and Share ARM Climate Research Facility - New Measurement Capabilities for Climate Research Thursday, December 17, 6:15-7:15 pm, Moscone West Room 2002 American Recovery and Reinvestment Act American Recovery and Reinvestment Act Scientists from around the world use data from the ARM Climate Research Facility to study the interactions between clouds, aerosol and radiation. Through the American Recovery and Reinvestment Act of 2009, the DOE Office of Science received $1.2 billion, with $60 million allocated to the ARM Climate Research Facility. With these funds, ARM will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several sites with precipitation radars and energy flux measurement capabilities,

250

CALUTRON ASSEMBLING AND DISASSEMBLING APPARATUS  

DOE Patents (OSTI)

The construction of a calutron tank is described, whcre the face plate of the tank carrying the ion separating mechanism may be inserted or withdrawn with a minimum of difficulty, even though the plate has considerable mass and the center of gravity of the plate assembly lies within the tank. In general, the plate is pivoted at its lower end by a specially designed hinge, whereby the weight of ths plate rests on the hinge when the plato is inserted in the tank opening. A pistoncylinder arrangement is mounted on the tank and attached at the top of the plate to produce sufficient force to pivot the plate out to a point where it withdraws by its own weight and to retard the natural tendency of the plate to close with heavy impact due to the unbalanced center of gravity of the plate assembly.

Andrews, R.E.

1959-01-27T23:59:59.000Z

251

Regenerator cross arm seal assembly  

SciTech Connect

A seal assembly for disposition between a cross arm on a gas turbine engine block and a regenerator disc, the seal assembly including a platform coextensive with the cross arm, a seal and wear layer sealingly and slidingly engaging the regenerator disc, a porous and compliant support layer between the platform and the seal and wear layer porous enough to permit flow of cooling air therethrough and compliant to accommodate relative thermal growth and distortion, a dike between the seal and wear layer and the platform for preventing cross flow through the support layer between engine exhaust and pressurized air passages, and air diversion passages for directing unregenerated pressurized air through the support layer to cool the seal and wear layer and then back into the flow of regenerated pressurized air.

Jackman, Anthony V. (Indianapolis, IN)

1988-01-01T23:59:59.000Z

252

Nuclear reactor composite fuel assembly  

DOE Patents (OSTI)

A core and composite fuel assembly for a liquid-cooled breeder nuclear reactor including a plurality of elongated coextending driver and breeder fuel elements arranged to form a generally polygonal bundle within a thin-walled duct. The breeder elements are larger in cross section than the driver elements, and each breeder element is laterally bounded by a number of the driver elements. Each driver element further includes structure for spacing the driver elements from adjacent fuel elements and, where adjacent, the thin-walled duct. A core made up of the fuel elements can advantageously include fissile fuel of only one enrichment, while varying the effective enrichment of any given assembly or core region, merely by varying the relative number and size of the driver and breeder elements.

Burgess, Donn M. (Richland, WA); Marr, Duane R. (West Richland, WA); Cappiello, Michael W. (Richland, WA); Omberg, Ronald P. (Richland, WA)

1980-01-01T23:59:59.000Z

253

Metal-ceramic joint assembly  

DOE Patents (OSTI)

A metal-ceramic joint assembly in which a brazing alloy is situated between metallic and ceramic members. The metallic member is either an aluminum-containing stainless steel, a high chromium-content ferritic stainless steel or an iron nickel alloy with a corrosion protection coating. The brazing alloy, in turn, is either an Au-based or Ni-based alloy with a brazing temperature in the range of 9500 to 1200.degree. C.

Li, Jian (New Milford, CT)

2002-01-01T23:59:59.000Z

254

Rotor assembly and assay method  

DOE Patents (OSTI)

A rotor assembly for carrying out an assay includes a rotor body which is rotatable about an axis of rotation, and has a central chamber and first, second, third, fourth, fifth, and sixth chambers which are in communication with and radiate from the central chamber. The rotor assembly further includes a shuttle which is movable through the central chamber and insertable into any of the chambers, the shuttle including a reaction cup carrying an immobilized antigen or an antibody for transport among the chambers. A method for carrying out an assay using the rotor assembly includes moving the reaction cup among the six chambers by passing the cup through the central chamber between centrifugation steps in order to perform the steps of: separating plasma from blood cells, binding plasma antibody or antigen, washing, drying, binding enzyme conjugate, reacting with enzyme substrate and optically comparing the resulting reaction product with unreacted enzyme substrate solution. The movement of the reaction cup can be provided by attaching a magnet to the reaction cup and supplying a moving magnetic field to the rotor.

Burtis, Carl A. (Oak Ridge, TN); Johnson, Wayne F. (Loudon, TN); Walker, William A. (Knoxville, TN)

1993-01-01T23:59:59.000Z

255

Calibration Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities DOE supports the development, standardization, and maintenance of calibration facilities for environmental radiation sensors. Radiation standards at the facilities are primarily used to calibrate portable surface gamma-ray survey meters and borehole logging instruments used for uranium and other mineral exploration and remedial action measurements. Standards for calibrating borehole fission neutron devices are also available, but are used infrequently. Radiation standards are constructed of concrete with elevated, uniform concentrations of naturally occurring potassium, uranium, and/or thorium. Pad standards have large, flat surfaces suitable for calibration

256

Pressure equalizing photovoltaic assembly and method  

DOE Patents (OSTI)

Each PV assembly of an array of PV assemblies comprises a base, a PV module and a support assembly securing the PV module to a position overlying the upper surface of the base. Vents are formed through the base. A pressure equalization path extends from the outer surface of the PV module, past the peripheral edge of the PV module, to and through at least one of the vents, and to the lower surface of the base to help reduce wind uplift forces on the PV assembly. The PV assemblies may be interengaged, such as by interengaging the bases of adjacent PV assemblies. The base may include a main portion and a cover and the bases of adjacent PV assemblies may be interengaged by securing the covers of adjacent bases together.

Dinwoodie, Thomas L. (Piedmont, CA)

2003-05-27T23:59:59.000Z

257

METC Combustion Research Facility  

SciTech Connect

The objective of the Morgantown Energy Technology Center (METC) high pressure combustion facility is to provide a mid-scale facility for combustion and cleanup research to support DOE`s advanced gas turbine, pressurized, fluidized-bed combustion, and hot gas cleanup programs. The facility is intended to fill a gap between lab scale facilities typical of universities and large scale combustion/turbine test facilities typical of turbine manufacturers. The facility is now available to industry and university partners through cooperative programs with METC. High pressure combustion research is also important to other DOE programs. Integrated gasification combined cycle (IGCC) systems and second-generation, pressurized, fluidized-bed combustion (PFBC) systems use gas turbines/electric generators as primary power generators. The turbine combustors play an important role in achieving high efficiency and low emissions in these novel systems. These systems use a coal-derived fuel gas as fuel for the turbine combustor. The METC facility is designed to support coal fuel gas-fired combustors as well as the natural gas fired combustor used in the advanced turbine program.

Halow, J.S.; Maloney, D.J.; Richards, G.A.

1993-11-01T23:59:59.000Z

258

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

259

Department of Residential Facilities Facilities Student Employment Office  

E-Print Network (OSTI)

Department of Residential Facilities Facilities Student Employment Office 1205E Leonardtown Service Updated 3/09 #12;EMPLOYMENT HISTORY Have you worked for Residential Facilities before? Yes No If so list

Milchberg, Howard

260

LLNL Site plan for a MOX fuel lead assembly mission in support of surplus plutonium disposition  

SciTech Connect

The principal facilities that LLNL would use to support a MOX Fuel Lead Assembly Mission are Building 332 and Building 334. Both of these buildings are within the security boundary known as the LLNL Superblock. Building 332 is the LLNL Plutonium Facility. As an operational plutonium facility, it has all the infrastructure and support services required for plutonium operations. The LLNL Plutonium Facility routinely handles kilogram quantities of plutonium and uranium. Currently, the building is limited to a plutonium inventory of 700 kilograms and a uranium inventory of 300 kilograms. Process rooms (excluding the vaults) are limited to an inventory of 20 kilograms per room. Ongoing operations include: receiving SSTS, material receipt, storage, metal machining and casting, welding, metal-to-oxide conversion, purification, molten salt operations, chlorination, oxide calcination, cold pressing and sintering, vitrification, encapsulation, chemical analysis, metallography and microprobe analysis, waste material processing, material accountability measurements, packaging, and material shipping. Building 334 is the Hardened Engineering Test Building. This building supports environmental and radiation measurements on encapsulated plutonium and uranium components. Other existing facilities that would be used to support a MOX Fuel Lead Assembly Mission include Building 335 for hardware receiving and storage and TRU and LLW waste storage and shipping facilities, and Building 331 or Building 241 for storage of depleted uranium.

Bronson, M.C.

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 10, 2012 [Facility News] July 10, 2012 [Facility News] Collaborations in Atmospheric Science and Observations Discussed in Germany Bookmark and Share Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the university's Jülich ObservatorY for Cloud Evolution (JOYCE) site. Crewell explained that JOYCE, like ARM facilities, was designed for long-term continuous measurements of cloud, radiation, boundary humidity, and precipitation, using active and passive remote sensing instruments. Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the

262

TRITIUM EXTRACTION FACILITY ALARA  

SciTech Connect

The primary mission of the Tritium Extraction Facility (TEF) is to extract tritium from tritium producing burnable absorber rods (TPBARs) that have been irradiated in a commercial light water reactor and to deliver tritium-containing gas to the Savannah River Site Facility 233-H. The tritium extraction segment provides the capability to deliver three (3) kilograms per year to the nation's nuclear weapons stockpile. The TEF includes processes, equipment and facilities capable of production-scale extraction of tritium while minimizing personnel radiation exposure, environmental releases, and waste generation.

Joye, BROTHERTON

2005-04-19T23:59:59.000Z

263

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities and Capabilities Facilities and Capabilities Primary Systems Infrastructure High Performance Storage Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Facilities and Capabilities | High Performance Storage SHARE High Performance Storage and Archival Systems To meet the needs of ORNL's diverse computational platforms, a shared parallel file system capable of meeting the performance and scalability require-ments of these platforms has been successfully deployed. This shared file system, based on Lustre, Data Direct Networks (DDN), and Infini-Band technologies, is known as Spider and provides centralized access to petascale datasets from all major on-site computational platforms. Delivering more than 240 GB/s of aggregate performance,

264

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News] 27, 2009 [Facility News] Arrival of Recovery Act Funds Sets Wheels In Motion Bookmark and Share So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. Through the American Recovery and Reinvestment Act of 2009 (aka stimulus), the Department of Energy's Office of Science received $1.2 billion. In late May, DOE released approximately $54 million-90 percent-of the $60 million allocated to the ARM Climate Research Facility. During the next 18 months, the ARM Climate Research Facility will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several

265

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

28, 2005 [Facility News] 28, 2005 [Facility News] Readiness of New Lidar Evaluated at Southern Great Plains Site Bookmark and Share Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. As the focus of the Boundary Layer Carbon Dioxide (CO2) Intensive Operational Period (IOP) starting in March, science collaborators at ITT Industries and the National Aeronautics and Space Administration (NASA)

266

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Quality Improvement Inspections Take Place Annual Quality Improvement Inspections Take Place Bookmark and Share During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. The Continuous Quality Improvement Program (CQIP) implemented by the ARM Program in 1998 requires annual audits and inspection visits to each of the ARM Climate Research Facility Southern Great Plains (SGP) site's 27 field facilities located in Oklahoma and Kansas. A small team of scientists and engineers conduct the inspections each year to evaluate the field

267

PNNL: About PNNL - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Facilities Scientific Facilities At PNNL, we offer scientific researchers access to unique equipment housed in state-of-the-art facilities as well as onsite experts to help visiting researchers take advantage of and make best use of the capabilities. You also have the opportunity to collaborate with our world-renowned scientists and engineers who can help you advance your scientific research and publish your results. Take a virtual tour of some of our laboratories. William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) EMSL EMSL is a U.S. Department of Energy (DOE) national user facility currently shared and used by researchers from around the world. Research at EMSL focuses principally on developing a molecular-level understanding of the physical, chemical, and biological processes that underlie the most

268

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Backup Software Improves Processing, Reliability at Data Management New Backup Software Improves Processing, Reliability at Data Management Facility Bookmark and Share Real-time data from all three of the ARM Climate Research Facility sites (North Slope of Alaska, Southern Great Plains, and Tropical Western Pacific) are collected and processed at the ARM Climate Research Facility Data Management Facility (DMF) each day. Processing involves the application of algorithms for performing simple averaging routines, qualitative comparisons, or more complicated experimental calculations. With continual advances in computer technology, keeping up with the volume and pace of incoming data is a daunting challenge. And because the remote sites do not provide backups, reliable backups of these data at the DMF are critical. In addition, significant numbers of value-added datasets are

269

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Mobile Facility Beta Testing Complete; System Headed to California Seashore Mobile Facility Beta Testing Complete; System Headed to California Seashore Bookmark and Share A key addition to the ARM Climate Research Facility scientific infrastructure is ready to roll...literally. In February, the ARM Mobile Facility (AMF) is being packed up and shipped from Richland, Washington, to the Point Reyes National Seashore north of San Francisco, California. There, it will be reassembled in preparation for its first deployment as part of a 6-month experiment to study the microphysical characteristics of marine stratus clouds, and in particular, marine stratus drizzle processes. Throughout the deployment, the AMF will accommodate aerosol observing equipment for National Oceanic and Atmospheric Administration (NOAA) researchers co-sponsored by ARM and the DOE Aerosol Science Program.

270

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Review of ARM Infrastructure Completed Review of ARM Infrastructure Completed Bookmark and Share In May, the Department of Energy's Biological and Environmental Research Advisory Committee (BERAC) published findings and recommendations from their assessment of the effectiveness of ARM Climate Research Facility as a national scientific user facility. Based on a review of total user requests, the BERAC concluded that ARM was being effectively used by the broader scientific community, not just the ARM Program. They also stated that cost cutting measures had achieved the desired efficiency goals, but further cuts could impair the Facility's operations. The subcommittee reinforced the importance of the scientific impacts of this facility (including publications), and the value it has had for the international

271

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 1, 2012 [Facility News] March 1, 2012 [Facility News] Arctic Storm Samples Show Relationship Between Sea Ice and Precipitation Over Land Bookmark and Share Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. As an important component of Earth's climate system, sea ice has a particularly strong influence on the Arctic sea surface temperature, evaporation, and reflectivity, or "albedo." The critical relationship among sea ice, evaporation, and precipitation is linked to a number of

272

MAX Fluid Dynamics facility  

NLE Websites -- All DOE Office Websites (Extended Search)

MAX Fluid Dynamics facility MAX Fluid Dynamics facility Capabilities Engineering Experimentation Reactor Safety Testing and Analysis Overview Nuclear Reactor Severe Accident Experiments MAX NSTF SNAKE Aerosol Experiments System Components Laser Applications Robots Applications Other Facilities Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr MAX Fluid Dynamics facility Providing high resolution data for development of computational tools that model fluid flow and heat transfer within complex systems such as the core of a nuclear reactor. 1 2 3 4 5 Hot and cold air jets are mixed within a glass tank while laser-based anemometers and a high-speed infrared camera characterize fluid flow and heat transfer behavior. Click on image to view larger size image.

273

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Commercial Infrared Sky Imagers Compared Bookmark and Share Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Four infrared imaging instruments were installed and operated at the ARM

274

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 [Facility News] 1, 2011 [Facility News] Data from Field Campaign in Black Forest, Germany, are Red Hot Bookmark and Share During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. A paper published in a special issue of the Quarterly Journal of the Royal Meteorological Society describing the scientific strategy, field phase, and

275

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2006 [Facility News] 15, 2006 [Facility News] Radar Wind Profiler Joins ARM Mobile Facility Instrument Suite Bookmark and Share This spring, a 915 MHz radar wind profiler (RWP) was successfully installed at the ARM Mobile Facility (AMF) site in Niamey, Niger, West Africa, for the remainder of the 1-year RADAGAST field campaign which started in January. The RWP will provide information about wind speed, wind direction, and wind shear, and also enable measurements of the turbulence in the lower part of the troposphere. This may be a key variable in determining the vertical distribution of dust in the experimental domain. Gradients in the radar's reflectivity spectrum may also help to provide continuous identification of the depth of the boundary layer in the summer months, when refractive gradients are likely to be maximized by low-level moisture.

276

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2006 [Facility News] April 30, 2006 [Facility News] Disdrometer Joins Tipping Bucket to Improve Precipitation Measurements Bookmark and Share At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. This spring, a pair of new distrometers began collecting data at the ARM Southern Great Plains (SGP) site and the ARM Darwin site in the Tropical

277

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 3, 2004 [Facility News] December 3, 2004 [Facility News] First Deployment of ARM Mobile Facility to Occur on California Coast Bookmark and Share Image - Point Reyes Beach Image - Point Reyes Beach Point Reyes National Seashore, on the California coast north of San Francisco, has been identified as the official location for the first deployment of the DOE's Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF). As part of a 6-month field campaign beginning in March 2005 to study the microphysical characteristics of marine stratus and, in particular, marine stratus drizzle processes, the AMF will provide a mature instrument system to help fill information gaps in the existing limited surveys of marine stratus microphysical structure. Marine stratus clouds are known to be susceptible to the byproducts of fossil fuel consumption, a

278

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2013 [Facility News] 9, 2013 [Facility News] ARM Facility Shares Return on Science Investments Bookmark and Share The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. To quote Ben Franklin, "If a man empties his purse into his head, no man can take it away from him. An investment in knowledge always pays the best interest." ARM Climate Research Facility staff who attended the fourth annual Atmospheric System Research (ASR) Science Team Meeting in April received a healthy dose of interest in March! With over 350 attendees presenting nearly 250 posters, the wealth of atmospheric climate science knowledge

279

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 20, 2011 [Facility News] May 20, 2011 [Facility News] From Snow to Sand; Mobile Facility Headed to the Maldives Bookmark and Share AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. After spending six very snowy months at Steamboat Springs, Colorado, the second ARM Mobile Facility (AMF2) is switching gears and heading to the tropical climes of the Maldives in the Indian Ocean. In mid-April, the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX) came to a close, ending the final chapter of the AMF2's maiden deployment. After packing up the instruments and data systems, the AMF2 team is now preparing

280

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Service Conserves Cash Satellite Service Conserves Cash Bookmark and Share In April, operations personnel completed a series of cost-saving data communication changes at the ARM Climate Research Facility Southern Great Plains (SGP) locale. The T-1 telephone lines at the four SGP boundary facilities were replaced with satellite dish technology. This change still allows large data sets to be transferred at acceptable bandwidth but at substantial savings. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Huge amounts of data are collected daily by SGP site instruments. These data must be transmitted rapidly and reliably from remote measurement

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

2, 2012 [Data Announcements, Facility News] 2, 2012 [Data Announcements, Facility News] Toolkit for ARM Radar Data Previewed at Workshop Bookmark and Share This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge. This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge.

282

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 [Facility News] March 31, 2009 [Facility News] New Sensors Installed for Cloud Radar Calibration at North Slope Bookmark and Share Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Cloud radars at the ARM sites provide important information about cloud properties and continue to evolve in providing climate researchers more complex data. This creates a greater need to know the absolute calibration of the radar reflectivity measurement. However, the large and immobile antenna for the millimeter wavelength cloud radar (MMCR) is impossible to point directly at a calibration target. At the ARM North Slope of Alaska

283

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2006 [Facility News] May 15, 2006 [Facility News] New Micropulse Lidars to Replace Old Ones; Deployments Begin at SGP Bookmark and Share A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. On May 3, the first of seven new and upgraded micropulse lidars (MPLs) was deployed at the ARM Southern Great Plains (SGP) site's Central Facility. These seven identical systems (including one spare) will replace the existing MPLs deployed at facilities throughout the SGP site and include new polarization capability. The MPLs provide critical backscatter

284

Nuclear Facility Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design FUNCTIONAL AREA GOAL: Headquarters and Field organizations and their contractors ensure that nuclear facilities are designed to assure adequate protection for the public, workers, and the environment from nuclear hazards. REQUIREMENTS:  10 CFR 830.120  10 CFR 830 subpart B  DOE O 413.3  DOE O 420.1B  DOE O 414.1C  DOE O 226.1  DOE M 426.1  DEAR 970-5404-2 Guidance:  DOE G 420.1-1  Project Management Practices, Integrated Quality ( Rev E, June 2003)  DOE Implementation Plan for DNSB Recommendation 2004-2 Performance Objective 1: Contractor Program Documentation Contracts between and the contractors who operate nuclear facilities contain adequate requirements concerning the conduct of nuclear facility safety design for nuclear facility capital projects and major modifications and the

285

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2006 [Facility News] January 15, 2006 [Facility News] ARM Mobile Facility Begins Year-Long Deployment in Africa Bookmark and Share Beginning on January 9, the ARM Mobile Facility began officially collecting atmospheric data from a location at the airport in Niamey, Niger, Africa. As part of the RADAGAST field campaign, the AMF will measure the effects of absorbing aerosols from desert dust in the dry season, and the effects of deep convective clouds and associated moisture loadings on the transmission of atmospheric radiation during the summer monsoon. These measurements will be combined with associated satellite data to provide the first well-sampled direct estimates of the energy balance across the atmosphere. This dataset will provide valuable information to an ongoing effort called

286

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 22, 2008 Facility News ARM Staff Changes to Note Bookmark and Share Dr. Martin Stuefer, newest member of NSA team, and his plane. Dr. Martin Stuefer, newest member of NSA...

287

ARM - Facility News Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Amazon Rainforest Apr 25 Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Apr 24 A Twist on TwisterTM: ARM Educational Outreach Participates in Community Science...

288

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2009 Facility News Internet Upgrade Speeds Data Transfer from Tropics Bookmark and Share View this video to see how the millimeter wave cloud radar works. View this video to...

289

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Network for Barrow, AK, and Stillwater, OK, are Available Through the External Data Center Bookmark and Share The ARM Climate Research Facility is providing data in netCDF...

290

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ` NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK March 2007 CEC-300 Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE CALIFORNIA ENERGY COMMISSION Jeffrey D. Byron B.B. Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE Mark

291

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK APRIL 2006 CEC-300 Director Heather Raitt Technical Director Renewable Energy Program Drake Johnson Office Manager Renewable Energy Office Valerie Hall Deputy Director Efficiency, Renewables, and Demand Analysis Division #12;These

292

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2004 Facility News Education and Outreach Program Visits Schools in the Tropics Bookmark and Share A native islander is interviewed in his natural setting at Manus Island as...

293

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

24, 2011 Facility News New Radar is a "Can't Miss" on Manus Resting atop a 60-foot tower, the new radar's antenna is visible above the treetops from most vantage points on...

294

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Exchange Researchers installed a continuous 222Rn monitor at the base of the 60-meter tower at the SGP Central Facility. A sampling tube connected to the tower supplies air to...

295

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2009 Facility News Climate Change Lesson Plan Selected for MyHealthySchool.com Bookmark and Share A lesson plan about climate change in the Arctic was selected by...

296

Liquidity facilities and signaling  

E-Print Network (OSTI)

This dissertation studies the role of signaling concerns in discouraging access to liquidity facilities like the IMF contingent credit lines (CCL) and the Discount Window (DW). In Chapter 1, I analyze the introduction of ...

Arregui, Nicols

2010-01-01T23:59:59.000Z

297

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman August 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

298

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman June 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

299

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE achieve its goal to provide open access to experimental data, as set forth in the DOE 2011 Strategic Plan. As a scientific user facility serving researchers both in the United...

300

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Preparations Underway for 2007 ARM Mobile Facility Deployment in Germany In the Black Forest region of Germany, the COPS field campaign will cover an area of about 700km2, as...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

0 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman May 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

302

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Records Set Again; New Process Enhances Reporting of User Facility Statistics The 2006 year-end ARM statistics included a spatial distribution of global (shown here; click map for...

303

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Capability Added to Cloud Radar As a prelude to great things to come throughout the user facility, a new 95-gigahertz scanning W-band cloud radar was installed in late...

304

JGI - The Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

The Facility aerial photo of JGI The Joint Genome Institute (foreground) The U.S. Department of Energy (DOE) Joint Genome Institute (JGI) is located in the former Dow Chemical...

305

B Plant facility description  

SciTech Connect

Buildings 225B, 272B, 282B, 282BA, and 294B were removed from the B Plant facility description. Minor corrections were made for tank sizes and hazardous and toxic inventories.

Chalk, S.E.

1996-10-04T23:59:59.000Z

306

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2004 Facility News SuomiNet-type Instruments Tested and Ready for Tropics Bookmark and Share The SuomiNet software integrates a network of global positioning systems...

307

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] ARM Outreach Materials Chosen for Earth Day Display in Washington DC Bookmark and Share Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Earth Day is officially honored each year on April 22, however, many groups sponsor activities throughout the entire month of April. At DOE Headquarters in Washington DC, two ARM posters were selected to join a poster display representing programs from numerous DOE offices. The display was featured in the Forrestal Building's ground-level and first floor lobby areas throughout the week of April 21. The posters were then displayed at

308

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Microwave Radiometers Put to the Test in Germany Bookmark and Share A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. Microwave radiometers (MWRs) are instruments used to measure emissions of water vapor and liquid water molecules in the atmosphere at specific microwave frequencies. Different MWRs are used to measure various frequencies, but the accuracy of all their retrievals is somewhat suspect,

309

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 28, 2010 Facility News First Data from Darwin Raman Lidar Bookmark and Share Since 1996, the ARM Southern Great Plains site has maintained one of the few operational...

310

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2009 [Facility News] 5, 2009 [Facility News] Turning a New Page with Facebook; Are You a Fan? Bookmark and Share Keep up with the ARM Climate Research Facilty via Facebook! Keep up with the ARM Climate Research Facilty via Facebook! As a scientific user facility for the global change research community, the ARM Climate Research Facility strives to provide data and share its climate observation capabilities with researchers around the world. In a continuing effort to reach new users, ARM is turning another page in its outreach strategy with a presence on Facebook. (You must have a Facebook account to access the page; if you don't have one, it is free and easy to create one.) Savvy Internet users of all ages increasingly use these types of communication tools to track topics of interest and share information with

311

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 28, 2006 [Facility News] February 28, 2006 [Facility News] Network of Infrared Thermometers Nearly Complete at SGP Bookmark and Share Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. As reported in April 2005, a network of infrared thermometers (IRT) is being installed throughout the ARM Southern Great Plains (SGP) site for the purpose of measuring cloud base temperature and inferring cloud base height across the domain. These measurements will enhance existing SGP surface and satellite cloud measurements to help scientists improve their calculations of heating rate profiles on the scale of global climate models. The first

312

Reconfigurable Assembly Station for Precision Manufacture of Nuclear Fusion Ignition Targets  

SciTech Connect

This paper explores the design and testing of a reconfigurable assembly station developed for assembling the inertial confinement nuclear fusion ignition targets that will be fielded in the National Ignition Facility (NIF) laser [1]. The assembly station, referred to as the Flexible Final Assembly Machine (FlexFAM) and shown in Figure 1, is a companion system to the earlier Final Assembly Machine (FAM) [2]. Both machines consist of a manipulator system integrated with an optical coordinate measuring machine (OCMM). The manipulator system has six groups of stacked axis used to manipulate the millimeter-sized target components with submicron precision, and utilizes the same force and torque feedback sensing as the FAM. Real-time dimensional metrology is provided by the OCMM's vision system and through-the-lens (TTL) laser-based height measuring probe. The manually actuated manipulator system of the FlexFAM provides a total of thirty degrees-of-freedom to the target components being assembled predominantly in a cubic centimeter work zone.

Castro, C; Montesanti, R C; Taylor, J S; Hamza, A V; Dzenitis, E G

2009-08-11T23:59:59.000Z

313

Educational Facilities Guidebook  

Science Conference Proceedings (OSTI)

This Guidebook provides utility marketing staff with a basic guide to 29 electric solutions for typical problems in educational facilities, including options for improved energy service quality, reduced energy costs, enhanced environmental protection, and increased electrification. In an era of aging educational facilities and tight budgets, the Guidebook suggests practical measures for applying 1990s electric technology to 1950s buildings as well as new buildings. It also highlights efficient electric t...

1997-01-28T23:59:59.000Z

314

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

315

CRAD, Facility Safety - Nuclear Facility Safety Basis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Facility Safety - Nuclear Facility Safety Basis More Documents & Publications CRAD, Facility Safety - Unreviewed Safety Question Requirements Site Visit Report, Livermore Site Office - February 2011 FAQS Job Task Analyses - Nuclear Safety Specialist

316

Mound facility physical characterization  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide a baseline physical characterization of Mound`s facilities as of September 1993. The baseline characterizations are to be used in the development of long-term future use strategy development for the Mound site. This document describes the current missions and alternative future use scenarios for each building. Current mission descriptions cover facility capabilities, physical resources required to support operations, current safety envelope and current status of facilities. Future use scenarios identify potential alternative future uses, facility modifications required for likely use, facility modifications of other uses, changes to safety envelope for the likely use, cleanup criteria for each future use scenario, and disposition of surplus equipment. This Introductory Chapter includes an Executive Summary that contains narrative on the Functional Unit Material Condition, Current Facility Status, Listing of Buildings, Space Plans, Summary of Maintenance Program and Repair Backlog, Environmental Restoration, and Decontamination and Decommissioning Programs. Under Section B, Site Description, is a brief listing of the Site PS Development, as well as Current Utility Sources. Section C contains Site Assumptions. A Maintenance Program Overview, as well as Current Deficiencies, is contained within the Maintenance Program Chapter.

Tonne, W.R.; Alexander, B.M.; Cage, M.R.; Hase, E.H.; Schmidt, M.J.; Schneider, J.E.; Slusher, W.; Todd, J.E.

1993-12-01T23:59:59.000Z

317

Method of monolithic module assembly  

DOE Patents (OSTI)

Methods for "monolithic module assembly" which translate many of the advantages of monolithic module construction of thin-film PV modules to wafered c-Si PV modules. Methods employ using back-contact solar cells positioned atop electrically conductive circuit elements affixed to a planar support so that a circuit capable of generating electric power is created. The modules are encapsulated using encapsulant materials such as EVA which are commonly used in photovoltaic module manufacture. The methods of the invention allow multiple cells to be electrically connected in a single encapsulation step rather than by sequential soldering which characterizes the currently used commercial practices.

Gee, James M. (Albuquerque, NM); Garrett, Stephen E. (Albuquerque, NM); Morgan, William P. (Albuquerque, NM); Worobey, Walter (Albuquerque, NM)

1999-01-01T23:59:59.000Z

318

BERA Recreational Facilities for FREE  

NLE Websites -- All DOE Office Websites (Extended Search)

RETIREES are welcome to use the BERA Recreational Facilities for FREE CONGRATULATIONS on your retirement Retirees are requested to use the recreational facilities during off...

319

User Facilities | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facilities Advanced Photon Source Argonne Leadership Computing Facility Argonne Tandem Linear Accelerator System Center for Nanoscale Materials Electron Microscopy Center...

320

Pollution Control Facilities (South Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

For the purpose of this legislation, pollution control facilities are defined as any facilities designed for the elimination, mitigation or prevention of air or water pollution, including all...

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Facility Disposition Safety Strategy RM  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Disposition Safety Strategy (FDSS) Review Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the facility documentation, preparations or...

322

LANL | Physics | Trident Laser Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

science at Trident Laser Facility Several important discoveries and first observations have been made at the Trident Laser Facility, a unique three-beam neodymium-glass laser...

323

Facilities Initiatives | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Administration, Office of Logistics and Facility Operations, has several energy saving initiatives in place or in progress at their Headquarters' facilities in the...

324

Secure Facilities & Capabilities | National Security | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Events and Conferences Supporting Organizations National Security Home | Science & Discovery | National Security | Facilities SHARE Secure Facilities and Capabilities...

325

Wheelabrator Saugus Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Saugus Biomass Facility Jump to: navigation, search Name Wheelabrator Saugus Biomass Facility Facility Wheelabrator Saugus Sector Biomass Facility Type Municipal Solid...

326

Valve stem and packing assembly  

DOE Patents (OSTI)

A valve stem and packing assembly is provided in which a rotatable valve stem includes a first tractrix surface for sliding contact with a stem packing and also includes a second tractrix surface for sliding contact with a bonnet. Force is applied by means of a spring, gland flange, and gland on the stem packing so the stem packing seals to the valve stem and bonnet. This configuration serves to create and maintain a reliable seal between the stem packing and the valve stem. The bonnet includes a second complementary tractrix surface for contacting the second sliding tractrix surface, the combination serving as a journal bearing for the entire valve stem and packing assembly. The journal bearing so configured is known as a Schiele`s pivot. The Schiele`s pivot also serves to maintain proper alignment of the valve stem with respect to the bonnet. Vertical wear between the surfaces of the Schiele`s pivot is uniform at all points of contact between the second sliding tractrix surface and the second complementary tractrix surface of a bonnet. The valve stem is connected to a valve plug by means of a slip joint. The valve is opened and closed by rotating the valve stem. The slip joint compensates for wear on the Schiele`s pivot and on the valve plug. A ledge is provided on the valve bonnet for the retaining nut to bear against. The ledge prevents overtightening of the retaining nut and the resulting excessive friction between stem and stem packing.

Wordin, J.J.

1990-12-31T23:59:59.000Z

327

Subsea production test valve assembly  

SciTech Connect

In the subsea test assembly securable within a blowout preventer stack above a subterranean well and positionable between upper and lower portions of a tubular conduit in fluid communication with a production zone within the well, the test assembly is described including an upper subassembly carriable with the upper conduit portion, a lower subassembly carriable with the lower conduit portion, and valve means in the lower subassembly manipulatable between opened and closed positions to control fluid flow within the conduit. The improvement comprises: the upper subassembly including an upper housing and first rigid dog means fixedly secured to the upper housing; the lower subassembly including a lower housing and second rigid dog means fixedly secured to the lower housing; the first rigid dog means positionable between a latch position for latching the upper and lower subassemblies and an unlatch position for unlatching the upper and lower subassemblies upon rotational movement of the first dog means with respect to the second dog means; and lock means axially movable relative to the first and second dog means from a lock position for limiting rotational movement of the first dog means with respect to the second dog means to an unlock position for allowing the first dog means to rotate relative to the second dog means and unlatch the upper subassembly from the lower subassembly.

Yates, P.D.

1988-03-22T23:59:59.000Z

328

Corner-cutting mining assembly  

DOE Patents (OSTI)

This invention resulted from a contract with the United States Department of Energy and relates to a mining tool. More particularly, the invention relates to an assembly capable of drilling a hole having a square cross-sectional shape with radiused corners. In mining operations in which conventional auger-type drills are used to form a series of parallel, cylindrical holes in a coal seam, a large amount of coal remains in place in the seam because the shape of the holes leaves thick webs between the holes. A higher percentage of coal can be mined from a seam by a means capable of drilling holes having a substantially square cross section. It is an object of this invention to provide an improved mining apparatus by means of which the amount of coal recovered from a seam deposit can be increased. Another object of the invention is to provide a drilling assembly which cuts corners in a hole having a circular cross section. These objects and other advantages are attained by a preferred embodiment of the invention.

Bradley, J.A.

1981-07-01T23:59:59.000Z

329

DRY TRANSFER FACILITY CRITICALITY SAFETY CALCULATIONS  

SciTech Connect

This design calculation updates the previous criticality evaluation for the fuel handling, transfer, and staging operations to be performed in the Dry Transfer Facility (DTF) including the remediation area. The purpose of the calculation is to demonstrate that operations performed in the DTF and RF meet the nuclear criticality safety design criteria specified in the ''Project Design Criteria (PDC) Document'' (BSC 2004 [DIRS 171599], Section 4.9.2.2), the nuclear facility safety requirement in ''Project Requirements Document'' (Canori and Leitner 2003 [DIRS 166275], p. 4-206), the functional/operational nuclear safety requirement in the ''Project Functional and Operational Requirements'' document (Curry 2004 [DIRS 170557], p. 75), and the functional nuclear criticality safety requirements described in the ''Dry Transfer Facility Description Document'' (BSC 2005 [DIRS 173737], p. 3-8). A description of the changes is as follows: (1) Update the supporting calculations for the various Category 1 and 2 event sequences as identified in the ''Categorization of Event Sequences for License Application'' (BSC 2005 [DIRS 171429], Section 7). (2) Update the criticality safety calculations for the DTF staging racks and the remediation pool to reflect the current design. This design calculation focuses on commercial spent nuclear fuel (SNF) assemblies, i.e., pressurized water reactor (PWR) and boiling water reactor (BWR) SNF. U.S. Department of Energy (DOE) Environmental Management (EM) owned SNF is evaluated in depth in the ''Canister Handling Facility Criticality Safety Calculations'' (BSC 2005 [DIRS 173284]) and is also applicable to DTF operations. Further, the design and safety analyses of the naval SNF canisters are the responsibility of the U.S. Department of the Navy (Naval Nuclear Propulsion Program) and will not be included in this document. Also, note that the results for the Monitored Geologic Repository (MGR) Site specific Cask (MSC) calculations are limited to the specific design chosen (see Assumption 3.4). A more current design will be included in the next revision of the criticality calculations for the Aging Facility. In addition, this calculation is valid for the current design as provided in Attachment III of the DTF and may not reflect the ongoing design evolution of the facility. However, it is anticipated that design changes to the facility layout will have little or no impact on the criticality results and/or conclusions presented in this document.

C.E. Sanders

2005-05-17T23:59:59.000Z

330

Improved nuclear fuel assembly grid spacer  

DOE Patents (OSTI)

An improved fuel assembly grid spacer and method of retaining the basic fuel rod support elements in position within the fuel assembly containment channel. The improvement involves attachment of the grids to the hexagonal channel and of forming the basic fuel rod support element into a grid structure, which provides a design which is insensitive to potential channel distortion (ballooning) at high fluence levels. In addition the improved method eliminates problems associated with component fabrication and assembly.

Marshall, John (San Jose, CA); Kaplan, Samuel (Los Gatos, CA)

1977-01-01T23:59:59.000Z

331

Fluidic self-actuating control assembly  

DOE Patents (OSTI)

A fluidic self-actuating control assembly for use in a reactor wherein no external control inputs are required to actuate (scram) the system. The assembly is constructed to scram upon sensing either a sudden depressurization of reactor inlet flow or a sudden increase in core neutron flux. A fluidic control system senses abnormal flow or neutron flux transients and actuates the system, whereupon assembly coolant flow reverses, forcing absorber balls into the reactor core region.

Grantz, Alan L. (Santa Clara, CA)

1979-01-01T23:59:59.000Z

332

Method for shearing spent nuclear fuel assemblies  

DOE Patents (OSTI)

A method is disclosed for shearing spent nuclear fuel assemblies of the type wherein a plurality of long metal tubes packed with ceramic fuel are supported in a spaced apart relationship within an outer metal shell or shroud which provides structural support to the assembly. Spent nuclear fuel assemblies are first compacted in a stepwise manner between specially designed gag-compactors and then sheared into short segments amenable to chemical processing by shear blades contoured to mate with the compacted surface of the fuel assembly.

Weil, Bradley S. (Oak Ridge, TN); Watson, Clyde D. (Knoxville, TN)

1977-01-01T23:59:59.000Z

333

Available Technologies: Self-Assembling Small Molecule ...  

... Efficient Small Molecule Bulk Heterojunction Solar Cells with High Fill Factors via Pyrene-Directed Molecular Self-Assembly, Adv. Mater. 2011, ...

334

Apparatus for shearing spent nuclear fuel assemblies  

DOE Patents (OSTI)

A method and apparatus are described for shearing spent nuclear fuel assemblies of the type comprising an array of fuel pins disposed within an outer metal shell or shroud. A spent fuel assembly is first compacted in a known manner and then incrementally sheared using fixed and movable shear blades having matched laterally projecting teeth which slidably intermesh to provide the desired shearing action. Incremental advancement of the fuel assembly after each shear cycle is limited to a distance corresponding to the lateral projection of the teeth to ensure fuel assembly breakup into small uniform segments which are amenable to remote chemical processing.

Weil, Bradley S. (Knoxville, TN); Metz, III, Curtis F. (Knoxville, TN)

1980-01-01T23:59:59.000Z

335

Assembly for directional drilling of boreholes  

Science Conference Proceedings (OSTI)

This patent describes a drilling assembly for directional drilling of boreholes in subsurface formations. The assembly comprising a downhole drilling motor. The motor having an output shaft which is suitable to drive a rotary drill bit and a motor housing which is suitable to be arranged at the lower end of a drill string; stabilizing means for stabilizing the assembly; means in the assembly for permanently tilting the central axis of the output shaft with respect to the longitudinal axis of the drill string in the borehole. It is characterized in that the stabilizing means include a lower-most stabilizer which is secured to and rotates with the output shaft.

Steiginga, A.; Worrall, R.N.

1989-11-14T23:59:59.000Z

336

Comprehensive facilities plan  

Science Conference Proceedings (OSTI)

The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

NONE

1997-09-01T23:59:59.000Z

337

Assembly and post-assembly manipulation of polyelectrolyte multilayers for control of bacterial attachment and viability  

E-Print Network (OSTI)

The overall goal of this thesis was to exploit the versatility of the polyelectrolyte multilayer (PEM) platform to consider bacteria-substrata interactions by varying multilayer assembly and post-assembly conditions. We ...

Lichter, Jenny, 1982-

2009-01-01T23:59:59.000Z

338

Optimal Neutron Source and Beam Shaping Assembly for Boron Neutron Capture Therapy  

E-Print Network (OSTI)

There were three objectives to this project: (1) The development of the 2-D Swan code for the optimization of the nuclear design of facilities for medical applications of radiation, radiation shields, blankets of accelerator-driven systems, fusion facilities, etc. (2) Identification of the maximum beam quality that can be obtained for Boron Neutron Capture Therapy (BNCT) from different reactor-, and accelerator-based neutron sources. The optimal beam-shaping assembly (BSA) design for each neutron source was also to e obtained. (3) Feasibility assessment of a new neutron source for NCT and other medical and industrial applications. This source consists of a state-of-the-art proton or deuteron accelerator driving and inherently safe, proliferation resistant, small subcritical fission assembly.

Vujic, J L; Greenspan, E; Guess, S; Karni, Y; Kastenber, W E; Kim, L; Leung, K N; Regev, D; Verbeke, J M; Waldron, W L; Zhu, Y

2003-01-01T23:59:59.000Z

339

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facility Improvements Continue at North Slope of Alaska Locale User Facility Improvements Continue at North Slope of Alaska Locale Bookmark and Share The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. Two things are critical for conducting scientific research: adequate equipment and power. This is especially true in the Arctic, where average winter temperatures hover around -30 degrees Celsius, and access to additional resources is limited. After experiencing crowded working conditions during complex field campaigns last year, followed by several power outages this past winter, operations staff at the ARM Climate Research Facility's North Slope of Alaska (NSA) locale began implementing

340

Nuclear Facility Safety Basis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Basis Safety Basis FUNCTIONAL AREA GOAL: A fully compliant Nuclear Facility Safety Basis. Program is implemented and maintained across the site. REQUIREMENTS:  10 CFR 830 Subpart B Guidance:  DOE STD 3009  DOE STD 1104  DOE STD  DOE G 421.1-2 Implementation Guide For Use in Developing Documented Safety Analyses To Meet Subpart B Of 10 CFR 830  DOE G 423.1-1 Implementation Guide For Use In Developing Technical Safety Requirements  DOE G 424.1-1 Implementation Guide For Use In Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation The site contractor has developed an up-to-date, comprehensive, compliant, documented nuclear facility safety basis and associated implementing mechanisms and procedures for all required nuclear facilities and activities (10 CFR

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2011 [Facility News] 5, 2011 [Facility News] Atmospheric System Research Announces Funding Opportunity Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. Successful applications will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve fundamental

342

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2010 [Facility News] August 15, 2010 [Facility News] Micropulse Lidars Get Boost from Recovery Act Bookmark and Share Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Through funding from the American Recovery and Reinvestment Act of 2009, ARM is upgrading the micropulse lidars (MPL) throughout the user facility. Similar to a radar, the MPL sends pulses of energy into the atmosphere.

343

SEU Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Logo The SEU Test Facility Logo The SEU Test Facility 1. Introduction The uninterrupted and progressive miniaturization of microelectronic devices while resulting in more powerful computers, has also made these computers more susceptible to the effects of ionizing radiation. This is of particular concern for space applications due to the radiation fields encountered outside the protective terrestrial atmosphere and magnetosphere. Starting in 1987, a coalition of US government agencies (NSA, NASA, NRL and USASSDC ) collaborated with BNL to develop a powerful and user-friendly test facility for investigating space-radiation effects on micro-electronic devices[1]. The main type of effects studied are the so called Single Event Upsets (SEUs) where ionization caused by the passage of

344

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2007 [Facility News] January 11, 2007 [Facility News] ARM Mobile Facility Moves to China in 2008 for Study of Aerosol Impacts on Climate Bookmark and Share Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) China generates exceptionally high amounts of aerosol particles whose influence on the atmosphere has been detected across the Pacific Rim. In the Yangtze River delta in southeast China, these high aerosol loadings

345

AWA Facility Expansion  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Upgrade Facility Upgrade Wei Gai High Energy Physics Division June 16, 2009 Background * AWA Group has been receiving very positive DOE Review evaluations in the last several years. * DOE funding has been constant or increasing, even in years with general budget cuts. * Outstanding scientific results have been achieved in recent years using the unique AWA electron beam capabilities (100 MV/m accelerating gradient). * General infrastructure in building 366 has improved in recent years (air-conditioner, better lighting, new laboratory space), creating a much better environment for conducting the AWA research program. * Additional RF power station (a second klystron) is being commissioned and it will improve the capabilities of the facility. Recent Budget Increase * Very positive DOE review (Dec. 2008) and

346

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

The Tale of the Tapes-No More Boxes of Data! The Tale of the Tapes-No More Boxes of Data! Bookmark and Share In October 1997, the ARM Program entered into a contract with the University of Alaska-Fairbanks to obtain image data covering the ARM Climate Research Facility's North Slope of Alaska (NSA) locale. Image data taken by an advanced very high resolution radiometer (AVHRR) are collected by a satellite receiver at Fairbanks and, up until February 2004, were stored on 4mm tapes. These boxes were then shipped by the boxful to the ARM Climate Research Facility External Data Center every six months. Once at the External Data Center, the data was processed into standard "hierarchical data format" or HDF files and transferred to the ARM Climate Research Facility Data Archive for use by ARM researchers. All data from

347

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Guest Instruments to Collect Aerosol Data During Coastal Field Campaign Guest Instruments to Collect Aerosol Data During Coastal Field Campaign Bookmark and Share The counter-flow virtual impactor (inset), which can characterize aerosol particles in cloud droplets, joins a number of other guest instruments at the ARM Mobile Facility deployment site at Point Reyes National Seashore in California. The counter-flow virtual impactor (inset), which can characterize aerosol particles in cloud droplets, joins a number of other guest instruments at the ARM Mobile Facility deployment site at Point Reyes National Seashore in California. The ARM Mobile Facility's (AMF's) inaugural field campaign, the Marine Stratus Radiation Aerosol and Drizzle (MASRAD) Intensive Operational Period, is well underway at Point Reyes National Seashore on the northern

348

Lighting Research Group: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Lighting Research Facilities at LBNL gonio-photometer Gonio-photometer We use this device to measure the intensity and direction of the light from a lamp or fixture. integrating sphere Integrating sphere This instrument allows us to get a fast and accurate measurement of the total light output of a lamp. We are not able to determine the direction of the light, only the intensity. power analyzer Power analyzer We use our power analyzer with the lamps in the gonio-photometer to measure input power, harmonic distortion, power factor, and many other signals that tell us how well a lamp is performing. spectro-radiometer Spectro-radiometer This device measures not only the intensity of a light source but also the intensity of the light at each wavelength.

349

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 24, 2013 [Education, Facility News] April 24, 2013 [Education, Facility News] A Twist on TwisterTM: ARM Educational Outreach Participates in Community Science Nights Bookmark and Share This week, the U.S. Department of Energy begins its National Science Bowl competition, a nationwide academic competition that tests students' knowledge in all areas of science. Created 22 years ago in 1991, the DOE National Science Bowl strives to encourage students to excel in mathematics and science and to pursue careers in these fields and is an important part of DOE's STEM (science, technology, engineering and math) education efforts today. The ARM Climate Research Facility supports STEM by participating in public science nights and developing climate related lesson plans to share at these events and via the ARM website.

350

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 10, 2010 [Facility News] March 10, 2010 [Facility News] Atmospheric System Research Funding Opportunity Announced Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. If the application is successful, the research will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve

351

Advanced Windows Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Exterior of Advanced Windows Test Facility Exterior of Advanced Windows Test Facility Advanced Windows Test Facility This multi-room laboratory's purpose is to test the performance and properties of advanced windows and window systems such as electrochromic windows, and automatically controlled shutters and blinds. The lab simulates real-world office spaces. Embedded instrumentation throughout the lab records solar gains and losses for specified time periods, weather conditions, energy use, and human comfort indicators. Electrochromic glazings promise to be a major advance in energy-efficient window technology, helping to achieve the goal of transforming windows and skylights from an energy liability in buildings to an energy source. The glazing can be reversibly switched from a clear to a transparent, colored

352

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 23, 2008 [Data Announcements, Facility News] July 23, 2008 [Data Announcements, Facility News] Second Version of Long-Term Climate Modeling Best Estimate Data Released Bookmark and Share Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. With major improvements in the cloud fraction, cloud liquid water path (LWP), precipitable water vapor (PWV), and surface radiative fluxes, a new version of the "Climate Modeling Best Estimate" (CMBE) is now available from the ARM Climate Research Facility Archive. This data set, specifically tailored for use in evaluating global climate models, includes long-term

353

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2007 [Facility News] October 15, 2007 [Facility News] ARM Joins National Science Foundation Remote Sensing Collaboration Bookmark and Share In September, the ARM Climate Research Facility became an official member of the National Science Foundation's Center for Collaborative Adaptive Sensing of the Atmosphere, or CASA. Initial discussions for partnering began nearly a year ago. After a series of informative visits and presentations, the decision was made to move forward with membership process. The transfer of interagency funds was completed on September 18, 2007, solidifying the partnership. In the meantime, CASA dedicated a significant effort to support the CLASIC field campaign in June 2007 by providing a network of four scanning X-band radars. CASA is a multi-sector partnership among academia, industry, and government

354

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

CIMEL Sunphotometer Helps Researchers See the Light in Australia CIMEL Sunphotometer Helps Researchers See the Light in Australia Bookmark and Share A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. Science collaborators at the Australian Bureau of Meteorology (BOM) and the Australian Commonwealth Scientific and Industry Research Organization (CSIRO) are using the ARM Climate Research Facility Darwin site in Australia to evaluate aerosol optical properties during the tropical dry season. As part of the Darwin Aerosol Intensive Operational Period (IOP), a

355

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 15, 2006 [Facility News] June 15, 2006 [Facility News] Data From Rotating Shadowband Spectroradiometer Now Available in Data Archive Bookmark and Share The Rotating Shadowband Spectroradiometer (RSS) is calibrated bi-weekly with external lamp calibrators for accuracy. The Rotating Shadowband Spectroradiometer (RSS) is calibrated bi-weekly with external lamp calibrators for accuracy. After refinements based on a series of successful field trials, the latest Rotating Shadowband Spectroradiometer (RSS) joins the collection of permanent ARM instruments at the ARM Southern Great Plains (SGP) site. The current RSS-known as the RSS105-is deployed at the SGP Central Facility and is the first commercially built RSS manufactured by Yankee Environmental Systems, Inc. Since its deployment in May 2003, the RSS has

356

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 11, 2011 [Facility News] October 11, 2011 [Facility News] Final Recovery Act Milestone Complete! Bookmark and Share To support all the new instruments from the Recovery Act, infrastructure upgrades ranging from power and platforms to communications and data systems required a focused team effort. To support all the new instruments from the Recovery Act, infrastructure upgrades ranging from power and platforms to communications and data systems required a focused team effort. For the past year and a half, ARM scientists, engineers, operations, and data systems staff have been working tirelessly to support the installation and operation of nearly 150 new and upgraded instruments throughout the user facility. In September, ARM received its final three instruments - a radar wind profiler; a micropulse lidar for the Darwin, Australia site; and

357

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2013 [Facility News] April 30, 2013 [Facility News] Gearing Up for Science in Amazon Rainforest Bookmark and Share In March 2013, an initial instrument suite began operating near Manacupuru, in the Brazilian state of Amazonas, as part of the GOAMAZON field campaign. In March 2013, an initial instrument suite began operating near Manacupuru, in the Brazilian state of Amazonas, as part of the GOAMAZON field campaign. Preparing for the biggest and most complex deployment of field resources to date, the ARM Mobile Facility operations team from Los Alamos National Laboratory spent three weeks in Brazil in early March tackling a range of protocol and logistics tasks for next year's GOAMAZON field campaign. Between ARM and Brazilian collaborators, about 80 instruments will obtain

358

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 [Data Announcements, Facility News] May 15, 2008 [Data Announcements, Facility News] Announcing the Release of the Radiative Flux Analysis PI Product Bookmark and Share Developed by Dr. Chuck Long, Radiative Flux Analysis PI Product data are now available from the ARM Climate Research Facility Archive. The current release includes data for all of the ARM fixed sites (except Darwin, which requires manual processing because of the monsoon season) plus data for the AMF deployments at Pt. Reyes and the COPS Black Forest site. Future releases will include data for Darwin, the COPS Hornisgrinde and Rhine Valley sites, and the AMF Niamey deployment. The Radiative Flux Analysis is a technique for using surface shortwave (SW) and longwave (LW) broadband radiation measurements for detecting periods of

359

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

W-Band Cloud Radar Added to ARM Mobile Facility in Africa W-Band Cloud Radar Added to ARM Mobile Facility in Africa Bookmark and Share Most of the WACR is mounted on top of one of the AMF shelters. The WACR computer and chiller (used to keep the WACR cool in temperatures up to 47 degrees C) are located in the shelter below the radar. Most of the WACR is mounted on top of one of the AMF shelters. The WACR computer and chiller (used to keep the WACR cool in temperatures up to 47 degrees C) are located in the shelter below the radar. A W-band ARM Cloud Radar (WACR) recently joined the suite of baseline capabilities offered by the ARM Mobile Facility (AMF). The term "W-band" refers to the specific radio frequency range of this radar, which is a 95 gigahertz pulse Doppler zenith pointing radar, providing profiles of cloud

360

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

More Storage Space, Better Reliability Now at the ARM Data Management More Storage Space, Better Reliability Now at the ARM Data Management Facility Bookmark and Share To support the ever-increasing file storage needs of the ARM Data Management Facility (DMF) and ARM Engineering computers, a Network Appliance (NetApp®) file server with 2.68 terabytes, or 2.95 trillion bytes, of highly-reliable and extremely-fast, usable disk storage joined the DMF servers. The NetApp system performs nearly four times faster than the previous file server and is engineered for a higher degree of reliability-critical improvements needed to maintain uptime for ARM data availability at the DMF. A NetApp server increases ARM storage capacity and keeps the data flowing at the Data Management Facility. A NetApp server increases ARM storage capacity and keeps the data flowing

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 8, 2012 [Facility News] October 8, 2012 [Facility News] Near Miss at Barrow Due to Beach Erosion Bookmark and Share With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. On a stormy Friday evening in early September, Walter Brower received an urgent message: "Beach erosion very close to ECOR Point." Brower is the local facility manager for ARM's North Slope of Alaska site in Barrow. His duties extend to Point Barrow at the coastline of the Arctic Ocean, where ARM operates an eddy correlation flux measurement system, or

362

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2005 [Facility News] 31, 2005 [Facility News] Ancillary Site to Provide Key Data from Africa Bookmark and Share In January 2006, the ARM Mobile Facility (AMF) begins a year-long field campaign in Africa as part of a multi-year international experiment called the African Monsoon Multidisciplinary Analysis (AMMA). The AMF will be placed at the airport in Niamey, Niger, well within view of the Global Earth Radiation Budget (GERB) geostationary satellite. Cloud and radiative property measurements collected by the AMF will be used in conjunction with GERB data for a greater understanding of the atmosphere than could be gained from either dataset alone. While preparing for the campaign, the science team identified the need for instrumentation at an off-site location to compare radiative measurements from the natural environment of

363

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 15, 2010 [Facility News] April 15, 2010 [Facility News] Second Phase of African Scientific Exchange Underway Bookmark and Share Left to right: Dr. Zewdu Segele and Hama Hamidou examine reflectivity measurements made by the W-band ARM cloud radar in Niamey during July 2006. Left to right: Dr. Zewdu Segele and Hama Hamidou examine reflectivity measurements made by the W-band ARM cloud radar in Niamey during July 2006. Continuing an international collaboration that began with the ARM Mobile Facility deployment to Niamey, Niger, in 2006, meteorologist Hama Hamidou from the University of Niamey recently arrived at the Cooperative Institute for Mesoscale Meteorological Studies at the University of Oklahoma for a six-month scientific exchange. Under the guidance of Dr. Zewdu Segele, a

364

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Climate Research Facility Communication Products Garner Awards in ARM Climate Research Facility Communication Products Garner Awards in Competition Bookmark and Share Entries in the Communicator Awards are judged by industry professionals who look for talents that exceed a high standard of excellence and work that serves as a benchmark for the industry. Entries in the Communicator Awards are judged by industry professionals who look for talents that exceed a high standard of excellence and work that serves as a benchmark for the industry. Trying to describe the ARM Climate Research Facility to an educated audience is hard enough; imagine explaining it to someone who knows next to nothing about atmospheric science! Judges of the 2005 Communicator Awards print media competition apparently got the message, as they gave awards to

365

SLIDESHOW: America's Wind Testing Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SLIDESHOW: America's Wind Testing Facilities SLIDESHOW: America's Wind Testing Facilities SLIDESHOW: America's Wind Testing Facilities July 17, 2012 - 4:51pm Addthis National Wind Technology Center - Colorado 1 of 7 National Wind Technology Center - Colorado The first of 4 towers is lifted as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-15 13:53 National Wind Technology Center - Colorado 2 of 7 National Wind Technology Center - Colorado Workers use a giant crane for lifting the blade assembly as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-22 12:06 Wind Technology Testing Center - Boston

366

SLIDESHOW: America's Wind Testing Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

America's Wind Testing Facilities America's Wind Testing Facilities SLIDESHOW: America's Wind Testing Facilities July 17, 2012 - 4:51pm Addthis National Wind Technology Center - Colorado 1 of 7 National Wind Technology Center - Colorado The first of 4 towers is lifted as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-15 13:53 National Wind Technology Center - Colorado 2 of 7 National Wind Technology Center - Colorado Workers use a giant crane for lifting the blade assembly as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-22 12:06 Wind Technology Testing Center - Boston

367

HFIR Experiment Facilities | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Experiment Facilities Experiment Facilities HFIR Experiment Facilities Neutron Scattering Facilities Target Positions Experiment Facilities in the Beryllium Reflector Large Removable Beryllium Facilities Small Removable Beryllium Facilities Control-Rod Access Plug Facilities Small Vertical Experiment Facilities Large Vertical Experiment Facilities Hydraulic Tube Facility Peripheral Target Positions Neutron Activation Analysis (NAA) Laboratory and Pneumatic Tube Facilities Slant Engineering Facilities Gamma Irradiation Facility Quality Assurance Requirements Contact Information Neutron Scattering Facilities The fully instrumented HFIR will eventually include 15 state-of-the-art neutron scattering instruments, seven of which will be designed exclusively for cold neutron experiments, located in a guide hall south of the reactor

368

Facilities | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Inertial Confinement Fusion Inertial Confinement Fusion Facilities Home > About Us > Our Programs > Defense Programs > Office of Research, Development, Test, and Evaluation > Office of Inertial Confinement Fusion > Facilities Facilities Office of Inertial Confinement Fusion, Facilities ICF operates a set of world-class experimental facilities to create HEDP conditions and to obtain quantitative data in support of its numerous stockpile stewardship-related activities. To learn about three high energy experimental facilities and two small lasers that provide ICF capabilities, select the links below. National Ignition Facility, Lawrence Livermore National Laboratory OMEGA and OMEGA EP, University of Rochester Laboratory for Laser Energetics Z Machine, Sandia National Laboratories

369

Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites

area area Contact Us | Careers | Staff Directory | User Support Search form Search Search Argonne Leadership Computing Facility an Office of Science user facility Home . About Overview History Staff Directory Careers Visiting Us Contact Us Resources & Expertise Mira Cetus Vesta Intrepid Challenger Surveyor Visualization Clusters Data and Networking Our Teams User Advisory Council Science at ALCF INCITE 2014 Projects ALCC 2013 Projects ESP Projects View All Projects Allocation Programs Early Science Program Publications Industry Collaborations News & Events Web Articles In the News Upcoming Events Past Events Informational Materials Photo Galleries User Services User Support Machine Status Presentations Training & Outreach User Survey Getting Started How to Get an Allocation New User Guide

370

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

16, 2008 [Facility News] 16, 2008 [Facility News] Revised Convective Triggering Mechanism Improves Precipitation Forecast Bookmark and Share Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). An improved convective triggering mechanism developed by ARM scientists based on ARM observations was implemented recently in the Global Spectral Model at the Japan Meteorological Agency (JMA) to improve surface precipitation forecasts. The revised triggering mechanism uses a dynamic convective available potential energy generation rate (DCAPE) to control the onset of deep convection. It assumes that deep convection occurs only when the large-scale dynamic forcing makes a positive

371

MPA-11 Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Cleanroom Facility is available for use by LANL researchers MPA-11 Facilities Fuel cell testing, acoustics laboratories, and a wide spectrum of characterization equipment are essential to the research conducted in our group. Fuel Cell Testing. ........Acoustics. ........Characterization . ........ Many other multi-disciplinary staff and experimental/computational capabilities throughout Los Alamos National Laboratory are available to support our research. Access to enabling capabilities for the Fuel Cell Program is facilitated by the Laboratory's Institute for Hydrogen and Fuel Cell Research. Fuel Cell Testing Experimental equipment that is essential to our fuel cell efforts is housed in 24 laboratories at the Los Alamos National Laboratory. A partial list of

372

Sandia Laboratories radiation facilities  

SciTech Connect

This brochure is designed as a basic source of information for prospective users of Sandia Laboratories Radiation Facilities. It contains a brief description of the various major radiation sources, a summary of their output characteristics, and additional information useful to experimenters. Radiation source development and source upgrading is an ongoing program, with new source configurations and modes of operation continually being devised to satisfy the ever-changing radiation requirements of the users. For most cases, the information here should allow a potential user to assess the applicability of a particular radiation facility to a proposed experiment and to permit some preirradiation calculations and planning.

Choate, L.M.; Schmidt, T.R.; Schuch, R.L.

1977-07-01T23:59:59.000Z

373

Snubber assembly for turbine blades  

DOE Patents (OSTI)

A snubber associated with a rotatable turbine blade in a turbine engine, the turbine blade including a pressure sidewall and a suction sidewall opposed from the pressure wall. The snubber assembly includes a first snubber structure associated with the pressure sidewall of the turbine blade, a second snubber structure associated with the suction sidewall of the turbine blade, and a support structure. The support structure extends through the blade and is rigidly coupled at a first end portion thereof to the first snubber structure and at a second end portion thereof to the second snubber structure. Centrifugal loads exerted by the first and second snubber structures caused by rotation thereof during operation of the engine are at least partially transferred to the support structure, such that centrifugal loads exerted on the pressure and suctions sidewalls of the turbine blade by the first and second snubber structures are reduced.

Marra, John J

2013-09-03T23:59:59.000Z

374

NUCLEAR REACTOR FUEL ELEMENT ASSEMBLY  

DOE Patents (OSTI)

A method of fabricating nuclear reactor fuel element assemblies having a plurality of longitudinally extending flat fuel elements in spaced parallel relation to each other to form channels is presented. One side of a flat side plate is held contiguous to the ends of the elements and a welding means is passed along the other side of the platertransverse to the direction of the longitudinal extension of the elements. The setting and speed of travel of the welding means is set to cause penetration of the side plate with welds at bridge the gap in each channel between adjacent fuel elements with a weld-through bubble of predetermined size. The fabrication of a high strength, dependable fuel element is provided, and the reduction of distortion and high production costs are facilitated by this method. (AEC)

Stengel, F.G.

1963-12-24T23:59:59.000Z

375

Low inductance power electronics assembly  

DOE Patents (OSTI)

A power electronics assembly is provided. A first support member includes a first plurality of conductors. A first plurality of power switching devices are coupled to the first support member. A first capacitor is coupled to the first support member. A second support member includes a second plurality of conductors. A second plurality of power switching devices are coupled to the second support member. A second capacitor is coupled to the second support member. The first and second pluralities of conductors, the first and second pluralities of power switching devices, and the first and second capacitors are electrically connected such that the first plurality of power switching devices is connected in parallel with the first capacitor and the second capacitor and the second plurality of power switching devices is connected in parallel with the second capacitor and the first capacitor.

Herron, Nicholas Hayden; Mann, Brooks S.; Korich, Mark D.; Chou, Cindy; Tang, David; Carlson, Douglas S.; Barry, Alan L.

2012-10-02T23:59:59.000Z

376

Miniature MT optical assembly (MMTOA)  

DOE Patents (OSTI)

An optical assembly (10) includes a rigid mount (12) with a recess (26) proximate a first side thereof, a substrate (14), and an optical die (16) flip-chip bonded to the substrate (14). The substrate (14) is secured to the first side of the mount and includes a plurality of die bonding elements (40), a plurality of optical apertures (32), and a plurality of external bonding elements (42). A plurality of traces (44) interconnect the die bonding elements (40) and the external bonding elements (42). The optical die (16) includes a plurality of optical elements, each element including an optical signal interface (48), the die being bonded to the plurality of die bonding elements (40) such that the optical signal interface (48) of each element is in registry with an optical aperture (32) of the substrate (14) and the die (16) is at least partially enclosed by the recess (26).

Laughlin, Daric (Overland Park, KS); Abel, Phillip (Overland Park, KS)

2008-04-01T23:59:59.000Z

377

Diverter assembly for radioactive material  

DOE Patents (OSTI)

A diverter assembly for diverting a pneumatically conveyed holder for a radioactive material between a central conveying tube and one of a plurality of radially offset conveying tubes includes an airtight container. A diverter tube having an offset end is suitably mounted in the container for rotation. A rotary seal seals one end of the diverter tube during and after rotation of the diverter tube while a spring biased seal seals the other end of the diverter tube which moves between various offset conveying tubes. An indexing device rotatably indexes the diverter tube and this indexing device is driven by a suitable drive. The indexing mechanism is preferably a geneva-type mechanism to provide a locking of the diverter tube in place. 3 figs.

Andrews, K.M.; Starenchak, R.W.

1988-04-11T23:59:59.000Z

378

Valve stem and packing assembly  

SciTech Connect

A valve stem and packing assembly is provided in which a rotatable valve stem includes a first tractrix surface for sliding contact with a stem packing and also includes a second tractrix surface for sliding contact with a bonnet. Force is applied by means of a spring, gland flange, and gland on the stem packing so the stem packing seals to the valve stem and bonnet. This configuration serves to create and maintain a reliable seal between the stem packing and the valve stem. The bonnet includes a second complementary tractrix surface for contacting the second sliding tractrix surface, the combination serving as a journal bearing for the entire valve stem and packing assembly. The journal bearing so configured is known as a Schiele's pivot. The Schiele's pivot also serves to maintain proper alignment of the valve stem with respect to the bonnet. Vertical wear between the surfaces of the Schiele's pivot is uniform at all points of contact between the second sliding tractrix surface and the second complementary tractrix surface of a bonnet. The valve stem is connected to a valve plug by means of a slip joint. The valve is opened and closed by rotating the valve stem. The slip joint compensates for wear on the Schiele's pivot and on the valve plug. A ledge is provided on the valve bonnet for the retaining nut to bear against. The ledge prevents overtightening of the retaining nut and the resulting excessive friction between stem and stem packing.

Wordin, John J. (Bingham County, ID)

1991-01-01T23:59:59.000Z

379

Valve stem and packing assembly  

DOE Patents (OSTI)

A valve stem and packing assembly is provided in which a rotatable valve stem includes a first tractrix surface for sliding contact with a stem packing and also includes a second tractrix surface for sliding contact with a bonnet. Force is applied by means of a spring, gland flange, and gland on the stem packing so the stem packing seals to the valve stem and bonnet. This configuration serves to create and maintain a reliable seal between the stem packing and the valve stem. The bonnet includes a second complementary tractrix surface for contacting the second sliding tractrix surface, the combination serving as a journal bearing for the entire valve stem and packing assembly. The journal bearing so configured is known as a Schiele's pivot. The Schiele's pivot also serves to maintain proper alignment of the valve stem with respect to the bonnet. Vertical wear between the surfaces of the Schiele's pivot is uniform at all points of contact between the second sliding tractrix surface and the second complementary tractrix surface of a bonnet. The valve stem is connected to a valve plug by means of a slip joint. The valve is opened and closed by rotating the valve stem. The slip joint compensates for wear on the Schiele's pivot and on the valve plug. A ledge is provided on the valve bonnet for the retaining nut to bear against. The ledge prevents over tightening of the retaining nut and the resulting excessive friction between stem and stem packing. 2 figures.

Wordin, J.J.

1991-09-03T23:59:59.000Z

380

Valve stem and packing assembly  

DOE Patents (OSTI)

A valve stem and packing assembly is provided in which a rotatable valve stem includes a first tractrix surface for sliding contact with a stem packing and also includes a second tractrix surface for sliding contact with a bonnet. Force is applied by means of a spring, gland flange, and gland on the stem packing so the stem packing seals to the valve stem and bonnet. This configuration serves to create and maintain a reliable seal between the stem packing and the valve stem. The bonnet includes a second complementary tractrix surface for contacting the second sliding tractrix surface, the combination serving as a journal bearing for the entire valve stem and packing assembly. The journal bearing so configured is known as a Schiele's pivot. The Schiele's pivot also serves to maintain proper alignment of the valve stem with respect to the bonnet. Vertical wear between the surfaces of the Schiele's pivot is uniform at all points of contact between the second sliding tractrix surface and the second complementary tractrix surface of a bonnet. The valve stem is connected to a valve plug by means of a slip joint. The valve is opened and closed by rotating the valve stem. The slip joint compensates for wear on the Schiele's pivot and on the valve plug. A ledge is provided on the valve bonnet for the retaining nut to bear against. The ledge prevents overtightening of the retaining nut and the resulting excessive friction between stem and stem packing.

Wordin, J.J.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Huntington Resource Recovery Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Huntington Resource Recovery Facility Biomass Facility Huntington Resource Recovery Facility Biomass Facility Jump to: navigation, search Name Huntington Resource Recovery Facility Biomass Facility Facility Huntington Resource Recovery Facility Sector Biomass Facility Type Municipal Solid Waste Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

382

Total Energy Facilities Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Total Energy Facilities Biomass Facility Total Energy Facilities Biomass Facility Jump to: navigation, search Name Total Energy Facilities Biomass Facility Facility Total Energy Facilities Sector Biomass Facility Type Non-Fossil Waste Location Los Angeles County, California Coordinates 34.3871821°, -118.1122679° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.3871821,"lon":-118.1122679,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

383

Stockton Regional Water Control Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Stockton Regional Water Control Facility Biomass Facility Stockton Regional Water Control Facility Biomass Facility Jump to: navigation, search Name Stockton Regional Water Control Facility Biomass Facility Facility Stockton Regional Water Control Facility Sector Biomass Facility Type Non-Fossil Waste Location San Joaquin County, California Coordinates 37.9175935°, -121.1710389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.9175935,"lon":-121.1710389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

384

Wheelabrator Millbury Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Millbury Facility Biomass Facility Wheelabrator Millbury Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Millbury Facility Biomass Facility Facility Wheelabrator Millbury Facility Sector Biomass Facility Type Municipal Solid Waste Location Worcester County, Massachusetts Coordinates 42.4096528°, -71.8571331° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.4096528,"lon":-71.8571331,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

385

Kent County Waste to Energy Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Kent County Waste to Energy Facility Biomass Facility Kent County Waste to Energy Facility Biomass Facility Jump to: navigation, search Name Kent County Waste to Energy Facility Biomass Facility Facility Kent County Waste to Energy Facility Sector Biomass Facility Type Municipal Solid Waste Location Kent County, Michigan Coordinates 43.0097027°, -85.520024° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0097027,"lon":-85.520024,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

386

North City Cogen Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

City Cogen Facility Biomass Facility City Cogen Facility Biomass Facility Jump to: navigation, search Name North City Cogen Facility Biomass Facility Facility North City Cogen Facility Sector Biomass Facility Type Landfill Gas Location San Diego County, California Coordinates 33.0933809°, -116.6081653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.0933809,"lon":-116.6081653,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

387

Metro Methane Recovery Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Methane Recovery Facility Biomass Facility Methane Recovery Facility Biomass Facility Jump to: navigation, search Name Metro Methane Recovery Facility Biomass Facility Facility Metro Methane Recovery Facility Sector Biomass Facility Type Landfill Gas Location Polk County, Iowa Coordinates 41.6278423°, -93.5003454° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6278423,"lon":-93.5003454,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

388

Gas Utilization Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Utilization Facility Biomass Facility Utilization Facility Biomass Facility Jump to: navigation, search Name Gas Utilization Facility Biomass Facility Facility Gas Utilization Facility Sector Biomass Facility Type Non-Fossil Waste Location San Diego County, California Coordinates 33.0933809°, -116.6081653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.0933809,"lon":-116.6081653,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

389

McKay Bay Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

McKay Bay Facility Biomass Facility McKay Bay Facility Biomass Facility Jump to: navigation, search Name McKay Bay Facility Biomass Facility Facility McKay Bay Facility Sector Biomass Facility Type Municipal Solid Waste Location Hillsborough County, Florida Coordinates 27.9903597°, -82.3017728° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.9903597,"lon":-82.3017728,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

390

Middlesex Generating Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Middlesex Generating Facility Biomass Facility Middlesex Generating Facility Biomass Facility Jump to: navigation, search Name Middlesex Generating Facility Biomass Facility Facility Middlesex Generating Facility Sector Biomass Facility Type Non-Fossil Waste Location Middlesex County, New Jersey Coordinates 40.4111363°, -74.3587473° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.4111363,"lon":-74.3587473,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

391

Fuel rod assembly to manifold attachment  

DOE Patents (OSTI)

A fuel element is formed with a plurality of fuel rod assemblies detachably connected to an overhead support with each of the fuel rod assemblies having a gas tight seal with the support to allow internal fission gaseous products to flow without leakage from the fuel rod assemblies into a vent manifold passageway system on the support. The upper ends of the fuel rod assemblies are located at vertically extending openings in the support and upper threaded members are threaded to the fuel rod assemblies to connect the latter to the support. The preferred threaded members are cap nuts having a dome wall encircling an upper threaded end on the fuel rod assembly and having an upper sealing surface for sealing contact with the support. Another and lower seal is achieved by abutting a sealing surface on each fuel rod assembly with the support. A deformable portion on the cap nut locks the latter against inadvertent turning off the fuel rod assembly. Orienting means on the fuel rod and support primarily locates the fuel rods azimuthally for reception of a deforming tool for the cap nut. A cross port in the fuel rod end plug discharges into a sealed annulus within the support, which serves as a circumferential chamber, connecting the manifold gas passageways in the support.

Donck, Harry A. (San Diego, CA); Veca, Anthony R. (San Diego, CA); Snyder, Jr., Harold J. (San Diego, CA)

1980-01-01T23:59:59.000Z

392

Pv-Thermal Solar Power Assembly  

DOE Patents (OSTI)

A flexible solar power assembly includes a flexible photovoltaic device attached to a flexible thermal solar collector. The solar power assembly can be rolled up for transport and then unrolled for installation on a surface, such as the roof or side wall of a building or other structure, by use of adhesive and/or other types of fasteners.

Ansley, Jeffrey H. (El Cerrito, CA); Botkin, Jonathan D. (El Cerrito, CA); Dinwoodie, Thomas L. (Piedmont, CA)

2001-10-02T23:59:59.000Z

393

Productivity Improvement of a Manual Assembly Line  

E-Print Network (OSTI)

The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process. The methodology consists of selecting a product or product family to be studied followed by current process study. Once the existing process is documented, all the assembly tasks involved must be timed using time study techniques. Operations analysis enables the reduction of non-productive tasks and results in a set of standardized work elements along with the set of standard procedures for performing the operations. Assembly line balancing along with the associated operations analysis assists in constructing or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line) are constructed for a case study. The results show that by changing over to the single stage assembly line configuration the operator productivity is doubled when compared to the existing assembly method.

Yerasi, Pranavi

2011-08-01T23:59:59.000Z

394

Automatically closing swing gate closure assembly  

DOE Patents (OSTI)

A swing gate closure assembly for nuclear reactor tipoff assembly wherein the swing gate is cammed open by a fuel element or spacer but is reliably closed at a desired closing rate primarily by hydraulic forces in the absence of a fuel charge.

Chang, Shih-Chih (Richland, WA); Schuck, William J. (Richland, WA); Gilmore, Richard F. (Kennewick, WA)

1988-01-01T23:59:59.000Z

395

Facility Representative Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Facility Representative Office of Nuclear Safety Home Facility Representative Home Annual Facility Rep Workshop › 2012 › 2011 › 2010 › 2009 › 2008 › 2007 › 2006 › 2005 › 2004 › 2003 › 2002 › 2001 › 2000 DOE Safety Links › ORPS Info › Operating Experience › DOE Lessons Learned › Accident Investigation Assessment Tools › FR CRADs › Surveillance Guides › Manager's Guide for Safety and Health Subject Matter Links General Program Information › Program Mission Statement › Program Directives and Guidance › FR of the Year Award Program › FR of the Year Award › FR Program Assessment Guide (Appendix B, DOE STD 1063-2011) FR Quarterly Performance Indicators Training & Qualification Information › Qualification Standards › Energy Online Courses

396

Locking support for nuclear fuel assemblies  

DOE Patents (OSTI)

A locking device for supporting and locking a nuclear fuel assembly within a cylindrical bore formed by a support plate, the locking device including a support and locking sleeve having upwardly extending fingers forming wedge shaped contact portions arranged for interaction between an annular tapered surface on the fuel assembly and the support plate bore as well as downwardly extending fingers having wedge shaped contact portions arranged for interaction between an annularly tapered surface on the support plate bore and the fuel assembly whereby the sleeve tends to support and lock the fuel assembly in place within the bore by its own weight while facilitating removal and/or replacement of the fuel assembly.

Ledin, Eric (San Diego, CA)

1980-01-01T23:59:59.000Z

397

Liquid-liquid interfacial nanoparticle assemblies  

DOE Patents (OSTI)

Self-assembly of nanoparticles at the interface between two fluids, and methods to control such self-assembly process, e.g., the surface density of particles assembling at the interface; to utilize the assembled nanoparticles and their ligands in fabrication of capsules, where the elastic properties of the capsules can be varied from soft to tough; to develop capsules with well-defined porosities for ultimate use as delivery systems; and to develop chemistries whereby multiple ligands or ligands with multiple functionalities can be attached to the nanoparticles to promote the interfacial segregation and assembly of the nanoparticles. Certain embodiments use cadmium selenide (CdSe) nanoparticles, since the photoluminescence of the particles provides a convenient means by which the spatial location and organization of the particles can be probed. However, the systems and methodologies presented here are general and can, with suitable modification of the chemistries, be adapted to any type of nanoparticle.

Emrick, Todd S. (South Deerfield, MA); Russell, Thomas P. (Amherst, MA); Dinsmore, Anthony (Amherst, MA); Skaff, Habib (Amherst, MA); Lin, Yao (Amherst, MA)

2008-12-30T23:59:59.000Z

398

DOE Designated User Facilities Multiple Laboratories * ARM Climate Research Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Designated User Facilities Designated User Facilities Multiple Laboratories * ARM Climate Research Facility Argonne National Laboratory * Advanced Photon Source (APS) * Electron Microscopy Center for Materials Research * Argonne Tandem Linac Accelerator System (ATLAS) * Center for Nanoscale Materials (CNM) * Argonne Leadership Computing Facility (ALCF) * Brookhaven National Laboratory * National Synchrotron Light Source (NSLS) * Accelerator Test Facility (ATF) * Relativistic Heavy Ion Collider (RHIC) * Center for Functional Nanomaterials (CFN) * National Synchrotron Light Source II (NSLS-II ) (under construction) Fermi National Accelerator Laboratory * Fermilab Accelerator Complex Idaho National Laboratory * Advanced Test Reactor ** * Wireless National User Facility (WNUF)

399

List of Geothermal Facilities | Open Energy Information  

Open Energy Info (EERE)

Facilities Facilities Jump to: navigation, search Facility Location Owner Aidlin Geothermal Facility Geysers Geothermal Area Calpine Amedee Geothermal Facility Honey Lake, California Amedee Geothermal Venture BLM Geothermal Facility Coso Junction, California, Coso Operating Co. Bear Canyon Geothermal Facility Clear Lake, California, Calpine Beowawe Geothermal Facility Beowawe, Nevada Beowawe Power LLC Big Geysers Geothermal Facility Clear Lake, California Calpine Blundell 1 Geothermal Facility Milford, Utah PacificCorp Energy Blundell 2 Geothermal Facility Milford, Utah PacificCorp Brady Hot Springs I Geothermal Facility Churchill, Nevada Ormat Technologies Inc CE Turbo Geothermal Facility Calipatria, California CalEnergy Generation Calistoga Geothermal Facility The Geysers, California Calpine

400

Assembly and Installation of the Daya Bay Antineutrino Detectors  

E-Print Network (OSTI)

The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle theta13, and recently made the definitive discovery of its nonzero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of 300 - 2000m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors.

H. R. Band; R. L. Brown; R. Carr; X. C. Chen; X. H. Chen; J. J. Cherwinka; M. C. Chu; E. Draeger; D. A. Dwyer; W. R. Edwards; R. Gill; J. Goett; L. S. Greenler; W. Q. Gu; W. S. He; K. M. Heeger; Y. K. Heng; P. Hinrichs; T. H. Ho; M. Hoff; Y. B. Hsiung; Y. Jin; L. Kang; S. H. Kettell; M. Kramer; K. K. Kwan; M. W. Kwok; C. A. Lewis; G. S. Li; N. Li; S. F. Li; X. N. Li; C. J. Lin; B. R. Littlejohn; J. L. Liu; K. B. Luk; X. L. Luo; X. Y. Ma; M. C. McFarlane; R. D. McKeown; Y. Nakajima; J. P. Ochoa-Ricoux; A. Pagac; X. Qian; B. Seilhan; K. Shih; H. Steiner; X. Tang; H. Themann; K. V. Tsang; R. H. M. Tsang; S. Virostek; L. Wang; W. Wang; Z. M. Wang; D. M. Webber; Y. D. Wei; L. J. Wen; D. L. Wenman; J. Wilhelmi; M. Wingert; T. Wise; H. L. H. Wong; F. F. Wu; Q. Xiao; L. Yang; Z. J. Zhang; W. L. Zhong; H. L. Zhuang

2013-09-06T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NREL: Technology Transfer - Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities Research Facilities Photo of Solar Energy Research Facility building at NREL. NREL's Solar Energy Research Facility is one of many world-class facilities available to public and private agencies. For developing commercially viable energy products, organizations may partner with NREL to use our state-of-the-art laboratories, and testing and user facilities. Visit NREL's Research Facilities Web site to learn more about them. We typically develop technology partnership agreements for using our facilities and/or working with our researchers. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Nondisclosure Agreements Research Facilities Commercialization Programs Success Stories News Contacts Did you find what you needed?

402

Designing effective step-by-step assembly instructions  

Science Conference Proceedings (OSTI)

We present design principles for creating effective assembly instructions and a system that is based on these principles. The principles are drawn from cognitive psychology research which investigated people's conceptual models of assembly and effective ... Keywords: assembly instructions, visualization

Maneesh Agrawala; Doantam Phan; Julie Heiser; John Haymaker; Jeff Klingner; Pat Hanrahan; Barbara Tversky

2003-07-01T23:59:59.000Z

403

An evolutionary fuel assembly design for high power density BWRs  

E-Print Network (OSTI)

An evolutionary BWR fuel assembly design was studied as a means to increase the power density of current and future BWR cores. The new assembly concept is based on replacing four traditional assemblies and large water gap ...

Karahan, Aydin

2007-01-01T23:59:59.000Z

404

Self-Assembly of Polymer Nano-Elements on Sapphire  

NLE Websites -- All DOE Office Websites (Extended Search)

Self-Assembly of Polymer Nano-Elements on Sapphire Self-Assembly of Polymer Nano-Elements on Sapphire Print Wednesday, 25 March 2009 00:00 Self-assembly of polymers promises to...

405

PCR - Ligation Assembly Standard for BioBrick Parts  

E-Print Network (OSTI)

This Request for Comments (RFC) describes a novel method for the assembly of standard BioBrick parts. This assembly method for BioBrick parts is an improvement upon the conventional methods of BioBrick part assembly. This ...

He, Tony PeiYuan

2011-12-15T23:59:59.000Z

406

THE DESIGN AND CONSTRUCTION OF THE EBR-II INITIAL FUEL LOADING FACILITY  

SciTech Connect

The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth)

Ayer, J.E.; Shuck, A.B.

1961-06-01T23:59:59.000Z

407

Wheelabrator Sherman Energy Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Sherman Energy Facility Biomass Facility Sherman Energy Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Sherman Energy Facility Biomass Facility Facility Wheelabrator Sherman Energy Facility Sector Biomass Location Penobscot County, Maine Coordinates 45.3230777°, -68.5806727° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3230777,"lon":-68.5806727,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

408

Thermal vacuum life test facility for radioisotope thermoelectric generators  

DOE Green Energy (OSTI)

In the late 1970's, the Department of Energy (DOE) assigned Monsanto Research Corporation, Mound Facility, now operated by EG G Mound Applied Technologies, the responsibility for assembling and testing General Purpose Heat Source (GPHS) radioisotope thermoelectric generators (RTGs). Assembled and tested were five RTGs, which included four flight units and one non-flight qualification unit. Figure 1 shows the RTG, which was designed by General Electric AstroSpace Division (GE/ASD) to produce 285 W of electrical power. A detailed description of the processes for RTG assembly and testing is presented by Amos and Goebel (1989). The RTG performance data are described by Bennett, et al. (1986). The flight units will provide electrical power for the National Aeronautics and Space Administration's (NASA) Galileo mission to Jupiter (two RTGs) and the joint NASA/European Space Agency (ESA) Ulysses mission to study the polar regions of the sun (one RTG). The remaining flight unit will serve as the spare for both missions, and a non-flight qualification unit was assembled and tested to ensure that performance criteria were adequately met. 4 refs., 3 figs.

Deaton, R.L.; Goebel, C.J.; Amos, W.R.

1990-01-01T23:59:59.000Z

409

Facility effluent monitoring plan for the 3720 facility  

SciTech Connect

This report describes the effluent monitoring plan for the 3720 facility. Airborne and liquid effluents are monitored.

Ballinger, M.Y.

1994-11-01T23:59:59.000Z

410

Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Indiana Department of Environmental Management requires permits before the construction or expansion of biomass anaerobic digestion or gasification facilities.

411

A classification scheme for LWR fuel assemblies  

Science Conference Proceedings (OSTI)

With over 100 light water nuclear reactors operating nationwide, representing designs by four primary vendors, and with reload fuel manufactured by these vendors and additional suppliers, a wide variety of fuel assembly types are in existence. At Oak Ridge National Laboratory, both the Systems Integration Program and the Characteristics Data Base project required a classification scheme for these fuels. This scheme can be applied to other areas and is expected to be of value to many Office of Civilian Radioactive Waste Management programs. To develop the classification scheme, extensive information on the fuel assemblies that have been and are being manufactured by the various nuclear fuel vendors was compiled, reviewed, and evaluated. It was determined that it is possible to characterize assemblies in a systematic manner, using a combination of physical factors. A two-stage scheme was developed consisting of 79 assembly types, which are grouped into 22 assembly classes. The assembly classes are determined by the general design of the reactor cores in which the assemblies are, or were, used. The general BWR and PWR classes are divided differently but both are based on reactor core configuration. 2 refs., 15 tabs.

Moore, R.S.; Williamson, D.A.; Notz, K.J.

1988-11-01T23:59:59.000Z

412

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 19, 2012 [Facility News] June 19, 2012 [Facility News] Storm Chasers Take a Break at the Southern Great Plains Site Bookmark and Share Scientist Gunnar Senum (far left) from Brookhaven National Laboratory describes the aerosol observing system to a group of visiting meteorology students from Rutgers University. Scientist Gunnar Senum (far left) from Brookhaven National Laboratory describes the aerosol observing system to a group of visiting meteorology students from Rutgers University. Taking a break from storm chasing due to "good weather," a group of 16 meteorology students from Rutgers University visited the ARM Southern Great Plains site in early June. The students, ranging from juniors to recent graduates, are participating in an inaugural severe weather class taught by

413

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2010 [Facility News] 31, 2010 [Facility News] Instruments on Mt. Pico to Supplement Measurements from Graciosa Island Bookmark and Share At an elevation of about 2225 meters-usually above the marine boundary layer-the Pico Observatory is able to measure properties in the atmosphere transported from North America and Europe. At an elevation of about 2225 meters-usually above the marine boundary layer-the Pico Observatory is able to measure properties in the atmosphere transported from North America and Europe. Located high on Mount Pico in the Azores, the University of the Azores, the University of Colorado, and Michigan Technological University operate an instrumented observation station, the Pico Observatory. In May, a small team of local volunteers from Pico Island helped install a set of ARM

414

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] Comprehensive Instrument Validation Campaign Concludes Bookmark and Share As the Aqua satellite moves along, the AIRS mirror scans a "swath" across the Earth's surface and directs infrared energy into the instrument. This energy is separated into wavelengths, which are transferred from Aqua to computers on the ground for additional processing. (Source: http://airs.jpl.nasa.gov As the Aqua satellite moves along, the AIRS mirror scans a "swath" across the Earth's surface and directs infrared energy into the instrument. This energy is separated into wavelengths, which are transferred from Aqua to computers on the ground for additional processing. (Source: http://airs.jpl.nasa.gov After almost four years, the last soundings in the final phase of the

415

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 28, 2013 [Facility News] June 28, 2013 [Facility News] What's a Little Helium Among Friends? Bookmark and Share In early June, this 38-cylinder helium storage system arrived at the ARM Southern Great Plains site with nearly 18,000 standard cubic feet of helium left in it-enough to launch about 400 weather balloons. In early June, this 38-cylinder helium storage system arrived at the ARM Southern Great Plains site with nearly 18,000 standard cubic feet of helium left in it-enough to launch about 400 weather balloons. What is white and blue, can hold 55,000 standard cubic feet (scf) of gas, and looks like it could attach to the International Space Station? A helium storage system, of course. This impressive contraption arrived at the ARM Southern Great Plains site in early June, along with 18,000 scf of helium inside-valuable stuff,

416

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Upgrades to Darwin Radar Double Data Delivery Bookmark and Share The new processor for the MMCR at Darwin collects spectral data in four different modes, resulting in approximately 3.4 gigabytes of signal output per day. The new processor for the MMCR at Darwin collects spectral data in four different modes, resulting in approximately 3.4 gigabytes of signal output per day. Virtually all cloud studies within the ARM Program involve the Millimeter Wavelength Cloud Radar (MMCR). This instrument is the only source for obtaining detailed information about cloud location and internal structure in the atmospheric columns above the ARM sites, and can be operated in almost any atmospheric condition. In November, a major upgrade to the 35

417

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2006 [Facility News] January 15, 2006 [Facility News] Location, Location, Location... Field Campaign Focuses on Latitude Effects Bookmark and Share A scintillometer was used to detect atmospheric optical disturbances-called scintillations-caused by temperature, pressure and humidity. The instrument emits light from two transmitters, shown at left. The light traverses the local atmosphere, perturbed by density fluctuations. Some of the light enters the receiver, shown at right. (Image from Scintec at www.scintec.com.) A scintillometer was used to detect atmospheric optical disturbances-called scintillations-caused by temperature, pressure and humidity. The instrument emits light from two transmitters, shown at left. The light traverses the local atmosphere, perturbed by density fluctuations. Some of the light

418

Science and Technology Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IBRF Project Lessons Learned Report IBRF Project Lessons Learned Report Integrated Biorefinery Research Facility Lessons Learned - Stage I Acquisition through Stage II Construction Completion August 2011 This document contains lessons learned for the Integrated Biorefinery Research Facility (IBRF) project. The period covered by these lessons learned is IBRF"s Stage I acquisition through Stage II construction completion. The lessons learned presented are specific for construction line item type projects at the National Renewable Energy Laboratory (NREL) typically with a total project cost (TPC) in excess of $20M. Lessons Learned - IBRF-001 Lessons Learned Statement: Incorporate a strong safety culture early and into all phases of the project, from developing the RFP through construction and commissioning.

419

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 11, 2012 [Education, Facility News] May 11, 2012 [Education, Facility News] Fairbanks Middle Schoolers Enjoy Field Trip to Barrow Bookmark and Share Watershed School's bundled-up 8th grade class and their chaperones stop for a quick photo in front of the U.S. flag near the Arctic sea ice. With its consistently chilly temperatures, student visits to the ARM site in Barrow are somewhat rare, but always welcome! Watershed School's bundled-up 8th grade class and their chaperones stop for a quick photo in front of the U.S. flag near the Arctic sea ice. With its consistently chilly temperatures, student visits to the ARM site in Barrow are somewhat rare, but always welcome! In April, the 8th grade class from Watershed School in Fairbanks, Alaska, made the long trek to the North Slope for a week-long field trip filled

420

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Radiosonde Temperature Sensor Benefits from Stronger Structure Bookmark and Share The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. Small sensor packages called radiosondes (or "sondes") are used to transmit atmospheric information from weather balloons as they rise through the air. Vaisala, the supplier of sondes used at all the ARM sites, has introduced

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 31, 2006 [Facility News] May 31, 2006 [Facility News] New Shortwave Spectroradiometer Deployed at SGP Bookmark and Share A ceiling port in the SGP Optical Trailer houses the optic element of the SWS, which connects to the spectrometer inside the trailer via fiber optic cable. A ceiling port in the SGP Optical Trailer houses the optic element of the SWS, which connects to the spectrometer inside the trailer via fiber optic cable. In late April, a new Shortwave Spectroradiometer (SWS) began operating at the ARM Southern Great Plains (SGP) site. The instrument measures the zenith solar spectral radiance (1.4° field of view) between 300-2200 nm. The SWS incorporates two Zeiss miniature monolithic spectrometers having a spectral resolution of 8 nm in the range 300-975 nm, and 12 nm in the range

422

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2011 [Facility News] , 2011 [Facility News] Methane Monitor Joins Surface Flux Instruments at North Slope Bookmark and Share The new ECOR/SEBS Tower at the NSA site in Barrow includes greenhouse gas flux instruments. At the top of the tower, left to right, are the methane sensor, sonic anemometer, and carbon dioxide and water vapor sensor. The horizontal arm below and to the left of these instruments is a net radiometer. The new ECOR/SEBS Tower at the NSA site in Barrow includes greenhouse gas flux instruments. At the top of the tower, left to right, are the methane sensor, sonic anemometer, and carbon dioxide and water vapor sensor. The horizontal arm below and to the left of these instruments is a net radiometer. In October 2011, the ARM North Slope of Alaska site in Barrow welcomed a

423

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 30, 2009 [Facility News] November 30, 2009 [Facility News] ARM Joins Global Reference Upper-Air Network Bookmark and Share Similar to a standard radiosonde, the frost point hygrometer is a digitally-controlled instrument attached to a weather balloon. As it rises through the air, atmospheric data collected by the sensor is recorded on the ground. This photo shows the computer chips, battery pack, and connector that make up the instrument package. Similar to a standard radiosonde, the frost point hygrometer is a digitally-controlled instrument attached to a weather balloon. As it rises through the air, atmospheric data collected by the sensor is recorded on the ground. This photo shows the computer chips, battery pack, and connector that make up the instrument package. One of the largest challenges from a global climate observations

424

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

29, 2012 [Facility News] 29, 2012 [Facility News] Workshop Identifies Critical Climate Science Challenges Bookmark and Share This DOE report summarizes a two-and-a-half day workshop held between U.S. and European collaborators to review outstanding climate change science questions related to clouds, aerosols and precipitation, and the observational strategies for addressing them. This DOE report summarizes a two-and-a-half day workshop held between U.S. and European collaborators to review outstanding climate change science questions related to clouds, aerosols and precipitation, and the observational strategies for addressing them. Clouds and aerosols remain as major sources of uncertainty in computer models of Earth systems. In large part, this uncertainty is due to a lack

425

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] Infrared Loss Study Underway at North Slope of Alaska Bookmark and Share At ARM's North Slope of Alaska site in Barrow, collocated sky radiometers are being evaluated to refine the methodology that accounts for infrared loss in polar conditions. At ARM's North Slope of Alaska site in Barrow, collocated sky radiometers are being evaluated to refine the methodology that accounts for infrared loss in polar conditions. In the far northern reaches of Alaska, extended periods of both darkness and daylight occur throughout the year. Additionally, extremely cold weather conditions contribute to a harsh operating environment for research equipment. Therefore, broadband radiometers at the ARM North Slope of Alaska (NSA) site are equipped with electric heaters inside the ventilators

426

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2008 [Facility News] January 31, 2008 [Facility News] ARM Exhibit Showcases Continuous Data at American Meteorological Society Annual Meeting Bookmark and Share During the 88th annual AMS meeting, interested participants stop by the ARM exhibit where ARM researchers answered their questions. During the 88th annual AMS meeting, interested participants stop by the ARM exhibit where ARM researchers answered their questions. In January, ARM joined nearly 100 other exhibitors at the 88th American Meteorological Society annual meeting in New Orleans. This year's meeting was organized around the broad theme of "Enhancing the Connectivity between Research and Applications for the Benefit of Society." More than 3000 attendees from academia, the private sector, and government attended

427

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 31, 2008 [Facility News] August 31, 2008 [Facility News] Phase 2 of Orbiting Carbon Observatory Field Campaign Begins Bookmark and Share A camera, weather station, and sun tracker with a protective dome are located on the roof of the fully automated FTS mobile laboratory. Inside the shelter, the spectrometer receives the reflected solar beam from the sun tracker, while the main computer system operates all the instruments and acquires the data. A camera, weather station, and sun tracker with a protective dome are located on the roof of the fully automated FTS mobile laboratory. Inside the shelter, the spectrometer receives the reflected solar beam from the sun tracker, while the main computer system operates all the instruments and acquires the data. The Orbiting Carbon Observatory, or OCO, is a National Aeronautics and

428

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2006 [Facility News] 18, 2006 [Facility News] ARM External Data Center Celebrates Ten Years of Service Bookmark and Share External Data Center was recognized for 10 years of service External Data Center was recognized for 10 years of service In celebration of its tenth year of operation, the ARM External Data Center (XDC), which is managed by Brookhaven National Laboratory, was recently recognized for its outstanding contribution to the scientific user community. The XDC collects and processes data from other climate monitoring and research programs to supplement the data collected at the ARM sites. ARM provides these data from external sources because they are usually not easily accessible from their original source. ARM Program Director Wanda Ferrell presented XDC manager Richard Wagener

429

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 6, 2009 [Facility News] August 6, 2009 [Facility News] Research Team Publishes Results from In-Depth Study of Sahel Climate System Bookmark and Share The Sahel region of West Africa has experienced long-term drought accompanied by profound socioeconomic consequences over the past 30 years. It is a favored location for the development of tropical easterly waves that may generate hurricanes. The Sahel region of West Africa has experienced long-term drought accompanied by profound socioeconomic consequences over the past 30 years. It is a favored location for the development of tropical easterly waves that may generate hurricanes. In a series of eight papers published between 2008 and 2009 in the Journal of Geophysical Research-Atmospheres, an international team of researchers

430

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2010 [Facility News] January 15, 2010 [Facility News] Radiometer Powered Up Down Under for Field Campaign at Gunn Point Bookmark and Share Near the tip of Australia's Northern Territory, Gunn Point is the location for the Darwin ARM Representativeness Experiment, or DARE. This offsite field campaign is obtaining measurements of solar and thermal energy and cloud properties, to compare against similar measurements collected at the permanent ARM site in Darwin, about 25 kilometers to the southwest of Gunn Point. Data collected by instruments at both sites will be compared to help scientists quantify local influences and variability that affect how representative measurements at the Darwin site are compared to the wider area. Radiometers (right) mounted on the roof of a shelter near the C-POL radar (left) confirmed loss of data due to shadowing effects.

431

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 16, 2007 [Facility News] October 16, 2007 [Facility News] ARM Education and Outreach Program Awarded Funding by National Science Foundation Bookmark and Share Andrea Maestas, ARM Education and Outreach Coordinator, was part of a team awarded National Science Foundation funding to engage Native Alaskans in the geosciences through the WGBH Teachers' Domain website. Andrea Maestas, ARM Education and Outreach Coordinator, was part of a team awarded National Science Foundation funding to engage Native Alaskans in the geosciences through the WGBH Teachers' Domain website. In July 2007, the National Science Foundation awarded funding to a proposal developed by ARM Education and Outreach and WGBH Boston-public television's pre-eminent production house. The winning project, titled "Engaging Alaska Natives with the Geosciences," will add digital media and

432

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientists Convene in Australia to Plan International Cloud Experiment Scientists Convene in Australia to Plan International Cloud Experiment Bookmark and Share During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. Coming from as far away as Italy, Switzerland, and the United States, a 45 member team gathered in Darwin, Australia, in mid-November to discuss plans

433

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Website Integration Effort Delivers One-Stop Shopping for Data Bookmark and Share The ARM website was upgraded with a new capability in September. ARM data users now have the ability to order data using the data cart from www.arm.gov. The ARM website was upgraded with a new capability in September. ARM data users now have the ability to order data using the data cart from www.arm.gov. On September 27, a new way to browse and order ARM data became available on the ARM website after nine months of development. ARM infrastructure staff from three national laboratories-Brookhaven National Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory-teamed together to integrate the ARM web pages with the ARM

434

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2007 [Facility News] March 31, 2007 [Facility News] Radiometers Operate in Low Water Vapor Conditions in Barrow, Alaska Bookmark and Share A researcher checks the GVR antennae on a cold, crisp day at the ARM site in Barrow, Alaska. The radiometer is inside the insulated box beneath the antenna; the data is collected and displayed on the computer inside the instrument shelter. A researcher checks the GVR antennae on a cold, crisp day at the ARM site in Barrow, Alaska. The radiometer is inside the insulated box beneath the antenna; the data is collected and displayed on the computer inside the instrument shelter. To provide more accurate ground-based measurements of water vapor in extremely arid environments, three types of 183.3-GHz radiometers operated simultaneously in February and March at the ARM North Slope of Alaska site

435

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

14, 2012 [Education, Facility News] 14, 2012 [Education, Facility News] ARM Education Receives Seal of Approval Bookmark and Share Resources selected by the Climate Literacy and Energy Awareness Network (CLEAN) must pass an extensive peer-review process to verify the accuracy and currency of the science. Resources selected by the Climate Literacy and Energy Awareness Network (CLEAN) must pass an extensive peer-review process to verify the accuracy and currency of the science. ARM's lesson plan, "Effects of Solar Radiation on Land and Sea" was recently selected for inclusion in the NSF-funded Climate Literacy and Energy Awareness Network's (CLEAN) collection of educational resources. Receipt of the prestigious CLEAN seal means that the selected resource passed an extensive peer-review by educators and scientists to ensure

436

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 31, 2008 [Facility News] December 31, 2008 [Facility News] Arctic Field Campaign Data and Instrument Performance Reviewed at Workshop Bookmark and Share Both wings of the Canadian National Research Council's Convair-580 aircraft were equipped with numerous cloud and aerosol probes during ISDAC. Both wings of the Canadian National Research Council's Convair-580 aircraft were equipped with numerous cloud and aerosol probes during ISDAC. In April 2008, the month-long Indirect and Semi-Direct Aerosol Campaign (ISDAC) obtained cloud and aerosol data from above, within, and below clouds in the vicinity of the ARM site in Barrow, Alaska. In mid-November, about 50 members of the ISDAC science team gathered in Lansdowne, Maryland, for a 1-day workshop to review and assess data quality and instrument

437

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 25, 2007 [Data Announcements, Facility News] April 25, 2007 [Data Announcements, Facility News] New, Improved Algorithm for Retrieving Liquid Water Path Now Available at the ARM Data Archive Bookmark and Share The MWRRET product uses an improved retrieval technique and a method to identify and remove biases from the data to greatly improve the retrieved LWP (blue). It also performs so-called physical retrievals at each radiosonde launch time (black dots)-physical retrievals are the best possible retrieval that can be performed. The MWRRET product uses an improved retrieval technique and a method to identify and remove biases from the data to greatly improve the retrieved LWP (blue). It also performs so-called physical retrievals at each radiosonde launch time (black dots)-physical retrievals are the best

438

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 15, 2007 [Facility News] December 15, 2007 [Facility News] Radar Antenna Replacement Effort Begins at Barrow Bookmark and Share On November 28, 2007, ARM operations and engineering staff braved -15°F weather to install the new radar antenna at Barrow. After lifting the antenna via crane onto the roof of the skydeck, the gloves had to come off to securely fasten all the tiny connecting screws and bolts-brrrrr! On November 28, 2007, ARM operations and engineering staff braved -15°F weather to install the new radar antenna at Barrow. After lifting the antenna via crane onto the roof of the skydeck, the gloves had to come off to securely fasten all the tiny connecting screws and bolts-brrrrr! For estimates of cloud boundaries, there is no better capability than the millimeter wave cloud radar (MMCR). This sophisticated radar is part of the

439

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 15, 2008 [Facility News] September 15, 2008 [Facility News] Global Earth Observations Portal Provides Gateway to ARM Data Bookmark and Share The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. Data obtained at the ARM sites are freely available to users worldwide through the ARM Data Archive. In August, ARM added another entry point to its data collection by registering the ARM Program and Data Archive as

440

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 3, 2010 [Facility News] November 3, 2010 [Facility News] Arctic Campaign Cut Short; Spring Restart A Possibility Bookmark and Share An unfortunate incident in the early stages of the Arctic Lower Troposphere Observed Structure (ALTOS) field campaign at Oliktok Point on the North Slope of Alaska has resulted in the campaign being terminated. The primary in situ measurement platform for the campaign was a tethered balloon for making ascents through the clouds with instruments that measure cloud microphysical properties, while ground-based instruments simultaneously collect additional data. During one of the balloon's initial flights, its primary and secondary tethers broke. A radio-controlled cut-down device was activated to bring down the balloon, which landed with its instrument

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Recovery Act Learn about ARM's efforts. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is a U.S. Department of Energy scientific user facility, providing data from strategically located in situ and remote sensing observatories around the world. [ Live Data Displays ] Featured Data 09.19.2013 New ARM Best Estimate Land Product Contains Critical Soil Quantities for Describing Land Properties 09.12.2013 Value-Added Product Estimates Planetary Boundary Layer Height from Radiosondes 08.29.2013 New Data Available for Precipitation Value-Added Product Feature12.30.2013 Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere For the first time, ARM ventures to Antarctica for one of several newly

442

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2011 [Facility News] 9, 2011 [Facility News] Forecasting Exercise Begins Oklahoma Storm Study Count Down Bookmark and Share Clouds like this, called by the name "anvil" for its shape, are one type of cloud system researchers hope to encounter during MC3E. Clouds like this, called by the name "anvil" for its shape, are one type of cloud system researchers hope to encounter during MC3E. Beginning April 2011, the ARM Southern Great Plains (SGP) site in north-central Oklahoma will host the first major field campaign to take advantage of numerous new radars and other remote sensing instrumentation installed throughout the site with funding from the American Recovery and Reinvestment Act. The Midlatitude Continental Convective Clouds Experiment (MC3E) will use two aircraft and a comprehensive array of ground-based

443

User Facility Science Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

user-facilities/highlights/ The Office of Science user-facilities/highlights/ The Office of Science is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for this vital area of national importance. It oversees - and is the principal federal funding agency of - the Nation's research programs in high-energy physics, nuclear physics, and fusion energy sciences. en {611EDD39-818D-4CBA-BFD7-9568495C1566}http://science.energy.gov/bes/highlights/2013/bes-2013-09-a/ The Role of Stripes in Superconducting Behavior Using neutron diffraction, movement of charged atoms arranged as "stripes"

444

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2007 [Facility News] 6, 2007 [Facility News] Radiative Heating in Unexplored Bands Campaign Begins Today Bookmark and Share This chart shows the spectral and height dependence of the infrared cooling rates for a mid-latitude summer profile. Note that the majority of the infrared cooling in the middle and upper tropsphere occurs in spectral regions that RHUBC will investigate. This chart shows the spectral and height dependence of the infrared cooling rates for a mid-latitude summer profile. Note that the majority of the infrared cooling in the middle and upper tropsphere occurs in spectral regions that RHUBC will investigate. In conjunction with other scientific activities taking place during International Polar Year 2007-2008, today (February 26) an international research team begins a three-week field campaign in Barrow, Alaska. The

445

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 6, 2010 [Facility News] October 6, 2010 [Facility News] New Raman Lidar En Route to Australia Bookmark and Share Since 1996, the ARM Southern Great Plains site has maintained one of the few operational Raman lidars in the world. Now, thanks to funding from the American Recovery and Reinvestment Act, the ARM Tropical Western Pacific site is about to join that exclusive group. A new Raman lidar, built by Sandia National Laboratories in New Mexico, is on its way to Darwin, Australia. Optics contained inside the Raman lidar shelter guide backscattered laser radiation in order to measure signals collected by the telescope. Optics contained inside the Raman lidar shelter guide backscattered laser radiation in order to measure signals collected by the telescope. The Raman lidar (light detection and ranging) uses pulses of laser

446

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2004 [Facility News] 31, 2004 [Facility News] New Technique Used to Measure Ice and Liquid in Clouds Bookmark and Share A mirror angled at 45 degrees inside the "winglet" viewing port deflects sunlight to the optical fiber and into the detector housed inside the "Great White" shelter at Barrow. A mirror angled at 45 degrees inside the "winglet" viewing port deflects sunlight to the optical fiber and into the detector housed inside the "Great White" shelter at Barrow. Difficulties in modeling the effects of clouds on climate arise largely from the insufficient number of observations needed to sufficiently understand cloud processes. Science collaborators at the National Oceanic and Atmospheric Administrations (NOAA) Aeronomy Laboratory have developed a

447

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 28, 2011 [Facility News] July 28, 2011 [Facility News] A Giant Lift for Arctic Climate Data Bookmark and Share A newly installed X-band scanning ARM precipitation radar operates from atop the Barrow Arctic Research Center in Alaska. A newly installed X-band scanning ARM precipitation radar operates from atop the Barrow Arctic Research Center in Alaska. Ushering in the first operational precipitation radar on the U.S. Arctic Coast, engineers completed acceptance testing for the new X-band scanning ARM precipitation radar (X-SAPR) on June 21 at its location atop the Barrow Arctic Research Center in Alaska. Data from the radar are transmitted through a wireless connection to the ARM site data system. With the radar up and running, signal returns on June 24 provided an indication of the

448

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2009 [Facility News] 30, 2009 [Facility News] Smart Filter Clears the Way for Speedy Data Transfer Bookmark and Share These data plots illustrate the results of the smart filter in reducing the volume of MMCR data. The left column shows the full reflectivity data for individual radar data collection modes: cirrus, precipitation, general, and boundary layer. The right column shows the data retained after applying the clear-sky filter. These data plots illustrate the results of the smart filter in reducing the volume of MMCR data. The left column shows the full reflectivity data for individual radar data collection modes: cirrus, precipitation, general, and boundary layer. The right column shows the data retained after applying the clear-sky filter. As reported in mid-February, data transfer from the ARM Tropical Western

449

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2012 [Facility News] 9, 2012 [Facility News] Unmanned Aircraft Test Flights Completed at Oliktok Point Bookmark and Share Because of its small size and light weight (72-inch wingspan and weighing about 22 pounds), the Bat-3 is launched using a bungee-powered catapult from the roof of a vehicle and can land autonomously on fixed wheels. Its modular design fits into two suitcase-sized containers. Because of its small size and light weight (72-inch wingspan and weighing about 22 pounds), the Bat-3 is launched using a bungee-powered catapult from the roof of a vehicle and can land autonomously on fixed wheels. Its modular design fits into two suitcase-sized containers. On October 22, a small flight team from New Mexico State University (NMSU) began the first in a series of test flights (see YouTube video) for the ARM

450

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2010 [Facility News] January 31, 2010 [Facility News] STORMVEX Science Team Confirms Site Plans; Outreach Begins at Weather Summit Bookmark and Share Dr. Ashley Williamson introduces the STORMVEX campaign to Weather Summit attendees. Dr. Ashley Williamson introduces the STORMVEX campaign to Weather Summit attendees. In late January, meteorologists from a dozen major news markets across the country gathered in Steamboat Springs, Colorado, for an annual event called the "Weather Summit" where they received a preview of the Storm Peak Lab Cloud Property Validation Experiment, or STORMVEX, field campaign scheduled to begin next fall. Meanwhile, down the hall, the STORMVEX science team reviewed the status of the campaign components thus far, discussed remaining instrument issues, and made assignments to complete a

451

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Experiment Bookmark and Share As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) After more than a year and a half of planning, proposals, and paperwork,

452

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 31, 2006 [Facility News] August 31, 2006 [Facility News] New Lidars Installed at Tropical Western Pacific Site Bookmark and Share A representative from Sigma Space Corporation trains ARM operations staff in Darwin, Australia, on various components of the new micropulse lidar. The lidar, shown at left, will be placed in one of the outdoor instrument shelters, below a hole in the roof for the laser to pulse through. A representative from Sigma Space Corporation trains ARM operations staff in Darwin, Australia, on various components of the new micropulse lidar. The lidar, shown at left, will be placed in one of the outdoor instrument shelters, below a hole in the roof for the laser to pulse through. As reported in May, all the ARM sites are benefiting from new and upgraded micropulse lidars. This month, the new lidar was received in Darwin,

453

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2010 [Data Announcements, Facility News] 5, 2010 [Data Announcements, Facility News] New Datastream Identifies Nauru Data Influenced by Clouds Bookmark and Share A new data set that identifies periods when Nauru data may be affected by island-influenced clouds has been produced by Chuck Long, site scientist for the ARM Tropical Western Pacific site. The Nauru island effect (NIE) data set currently covers the period from September 2005 to May 2010 and will be updated periodically as new data are obtained. This data set will help scientists in their analysis of cloud and radiation data at Nauru and will enable them to perform more relevant comparisons of observations and model results. This conceptual model of the Nauru island effect phenomenon shows the location of the ARM and auxiliary Licor shortwave radiometer sites.

454

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 18, 2012 [Facility News] January 18, 2012 [Facility News] Wind Profiler Completes Offsite Campaign Bookmark and Share The radar wind profiler operates by sending pulses of energy into the sky and measuring the strength and frequency of returned energy. The radar wind profiler operates by sending pulses of energy into the sky and measuring the strength and frequency of returned energy. Between November 2010 and November 2011, a handful of meteorological instruments-including Doppler sodar, ultrasonic anemometers, and one of ARM's radar wind profilers-gathered massive amounts of data for the Columbia Basin Wind Energy Study. To ensure that the data collected represent conditions experienced by real wind plants, the instruments were placed next to an operating wind farm on the eastern border of Washington

455

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2010 [Facility News] July 31, 2010 [Facility News] Containers for Aerosol Observing Systems Pass Acceptance Testing Bookmark and Share Left to right: Pat Maloy, Stephen Springston, and Mike Ritsche inspect the AMF2 AOS container. They checked for proper locations of unistrut on the ceiling, walls and floor for connecting racks and other equipment, as well as functioning of HVAC units and infrared heaters (above Mike's head). Red lights are required for nighttime ship operations, and the hatch in ceiling will accommodate the aerosol stack. Left to right: Pat Maloy, Stephen Springston, and Mike Ritsche inspect the AMF2 AOS container. They checked for proper locations of unistrut on the ceiling, walls and floor for connecting racks and other equipment, as well as functioning of HVAC units and infrared heaters (above Mike's head). Red

456

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2006 [Facility News] January 31, 2006 [Facility News] Media Day Kicks Off Tropical Cloud Study in Australia Bookmark and Share While on the ground, the Twin Otter (left) and Proteus (right) are sharing hangar space at the Royal Australian Air Force base for the duration of TWP-ICE field operations. While on the ground, the Twin Otter (left) and Proteus (right) are sharing hangar space at the Royal Australian Air Force base for the duration of TWP-ICE field operations. Two days after a highly successful media day, January 21 marked the official start of flight operations for the Tropical Warm Pool International Cloud Experiment in Darwin, Australia. Science team members are guiding the aircraft missions from the Bureau of Meteorology's Forecast Center in Darwin; the rest of the experiment activities are being managed

457

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2007 [Facility News] 31, 2007 [Facility News] Long-term Radiosonde Validation Campaign Concludes Bookmark and Share In 2007, sonde launches at ARM sites supported validation of the IASI instrument onboard the Metop-A satellite. As the satellite scans a "swath" of the Earth below it, the IASI scanning mirror directs emitted infrared radiation into the uncovered interferometer to derive atmospheric temperature and humidity profiles. (Image source: European Space Agency) In 2007, sonde launches at ARM sites supported validation of the IASI instrument onboard the Metop-A satellite. As the satellite scans a "swath" of the Earth below it, the IASI scanning mirror directs emitted infrared radiation into the uncovered interferometer to derive atmospheric temperature and humidity profiles. (Image source: European Space Agency)

458

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 15, 2006 [Facility News] April 15, 2006 [Facility News] TWP Site Hosts Preliminary Study for Long Term Measurements of Greenhouse Gases Bookmark and Share To validate the space-based carbon dioxide retrievals by the Orbiting Carbon Observatory (OCO) through comparative carbon dioxide measurements, ARM's Tropical Western Pacific site in Darwin, Australia, is hosting a ground-based solar-viewing Fourier transform spectrometer (FTS) mobile laboratory, sponsored by the OCO Science Team. Between January 15 and February 7, 2006, overflights of the FTS site, as well as "flights of opportunity" by ARM's Proteus aircraft during the Tropical Warm Pool International Cloud Experiment, were completed. Additional flights from the European Union's Geophysica aircraft over the site in November and December

459

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 25, 2010 [Facility News] October 25, 2010 [Facility News] Testing Underway for New Doppler Lidars Bookmark and Share Two of the three new Doppler lidars are shown here during testing at the Southern Great Plains site in October. Two of the three new Doppler lidars are shown here during testing at the Southern Great Plains site in October. To improve climate models, the scientific community needs accurate and routine measurements of atmospheric winds with high vertical and temporal resolution under clear-air conditions. In particular, measurements of clear-air vertical air velocities will compliment in-cloud vertical velocity measurements from existing 35 and 95 gigahertz ARM cloud radars. In response to this need, three new Doppler lidars were purchased with funds from the American Recovery and Reinvestment Act and began a test

460

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2007 [Facility News] September 30, 2007 [Facility News] Atqasuk Joins International Network of Meteorological Stations Bookmark and Share On the skydeck at Atqasuk, the new met pack (above right) and GPS receiver (circled at left) acquire data for the SuomiNet. On the skydeck at Atqasuk, the new met pack (above right) and GPS receiver (circled at left) acquire data for the SuomiNet. At the North Slope of Alaska, the ARM operates a research site in the remote town of Atqasuk, Alaska, to provide continental Arctic data to the climate research community. The Atqasuk site is proving useful to climate modelers since this inland site is more homogenous and uniform than coastal sites during summer months. Enhancements to the instrument suite in Atqasuk last year led to a recent addition that solidified Atqasuk's position on

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The VAO Transient Facility  

E-Print Network (OSTI)

The time domain community wants robust and reliable tools to enable production of and subscription to community-endorsed event notification packets (VOEvent). The VAO Transient Facility (VTF) is being designed to be the premier brokering service for the community, both collecting and disseminating observations about time-critical astronomical transients but also supporting annotations and the application of intelligent machine-learning to those observations. This distinguishes two types of activity associated with the facility: core infrastructure and user services. In this paper, we will review the prior art in both areas and describe the planned capabilities of the VTF. In particular, we will focus on scalability and quality-of-service issues required by the next generation of sky surveys, such as LSST and SKA.

Graham, Matthew J; Drake, Andrew; Mahabal, Ashish; Williams, Roy; Seaman, Rob

2011-01-01T23:59:59.000Z

462

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Disaster Plan Deflects Problems During Downpour Disaster Plan Deflects Problems During Downpour Bookmark and Share A late-winter storm in the Midwest could have wreaked havoc at the ARM Program's Southern Great Plains (SGP) site in northern Oklahoma. Fortunately, the site's Disaster Plan was successfully implemented. SGP's 160-acre Central Facility, the heart of the site, is heavily instrumented to collect and monitor atmospheric data collected from in situ and remote-sensing instrument clusters arrayed throughout the 55,000 square mile site. Although the Central Facility is on the highest point of land in the county, extreme rainfall and flooding on March 4 rendered access roads from the East impassable to vehicular traffic, and the West access road through Lamont was submerged in several locations. Local rainfall amounts

463

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Arctic Aerosol Study Flies By Bookmark and Share Ending its mission with a final flight on April 30, 2008, the Indirect and Semi-Direct Aerosol Campaign (ISDAC) flew a total of 103 research hours, completing 27 science flights primarily in the region around the ARM North Slope of Alaska site in Barrow. These flights included several golden cases where both cloud and aerosol measurements were obtained above, within, and below mixed-phase cloud layers. In addition, the campaign successfully demonstrated first-time airborne deployments of key instruments for measuring aerosol properties. All of the campaign's primary objectives were met, plus some secondary objectives, to help answer the team's science questions related to Arctic cloud and aerosol interactions.

464

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

25, 2011 [Education, Facility News] 25, 2011 [Education, Facility News] Remote Schools Welcome Much-Needed Resources Bookmark and Share Students at the Children's Academy Centre in Lorengau gather as Jacklyn Soko, Teacher-in-Charge at the school, gratefully receives the donation of a new copier. Students at the Children's Academy Centre in Lorengau gather as Jacklyn Soko, Teacher-in-Charge at the school, gratefully receives the donation of a new copier. Seven schools on Manus Island recently welcomed new copiers donated through ARM's Education and Outreach program. Hymson Waffi, officer-in-charge for the ARM's Tropical Western Pacific site on Manus Island, enjoyed the happy task of delivering the equipment to the various schools, including elementary, primary, secondary, and an academy. Each copier was accompanied

465

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2006 [Facility News] April 30, 2006 [Facility News] HydroKansas Follows Water Flowing Through Space and Time Bookmark and Share Sets of rain and stream gauges like this one will provide information about water level and flow rates from 14 different sites throughout the Whitewater River watershed during the HydroKansas field campaign. Sets of rain and stream gauges like this one will provide information about water level and flow rates from 14 different sites throughout the Whitewater River watershed during the HydroKansas field campaign. Beginning in May, the Whitewater River watershed in south-central Kansas is the setting for a 3-year field campaign hosted by the ARM's Southern Great Plains (SGP) site. Called "HydroKansas," the goal of this research project is to develop a predictive understanding of floods on multiple spatial and

466

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] Improved Instrument Calibration Capabilities Benefit All Sites, Users Bookmark and Share To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. The ARM fills a unique position in the scientific community by obtaining

467

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2006 [Facility News] 30, 2006 [Facility News] Precipitation Sensor on Duty at North Slope of Alaska Bookmark and Share The precipitation sensor was installed about 5 feet above the surface on the piling in the foreground, with power connected through a nearby Climate Reference Network box (background). The precipitation sensor was installed about 5 feet above the surface on the piling in the foreground, with power connected through a nearby Climate Reference Network box (background). Extremely low temperatures and humidity in the northern hemisphere make it very difficult to obtain accurate precipitation measurements. However, because the impacts of climate change are shown to occur most rapidly in the sensitive Arctic environment, these measurements are needed for characterizing boundary layer (surface to 1000-m altitude) conditions and

468

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] New Operations Status System Improves Tracking, Reporting Bookmark and Share Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. With heavily instrumented research sites around the globe, the ARM faces a daunting operations and reporting challenge. To better track and report the status of the capabilities at these widely disbursed sites, ARM operations staff recently completed the development of a comprehensive Operations Status System (OSS). By serving as a central collection point for all ARM

469

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2010 [Facility News] September 30, 2010 [Facility News] Measurements of Total Surface Energy Now Available from Australia Bookmark and Share As shown in this photo at the wharf in Darwin, Australia, the new ECOR/SEBS station includes solar panels for power. As shown in this photo at the wharf in Darwin, Australia, the new ECOR/SEBS station includes solar panels for power. Measurements of sensible, latent, and carbon dioxide fluxes are valuable for refining both regional and global climate models. Since 1997, only ARM's Southern Great Plains site provided these continuous measurements using eddy correlation flux (ECOR) and energy balance Bowen ratio (EBBR) stations. Now, ARM's tropical site in Darwin, Australia, is also providing these measurements, thanks to the American Recovery and

470

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 3, 2011 [Facility News] January 3, 2011 [Facility News] Cloud Radar Overhauled and Renamed Bookmark and Share The KAZR (left) is being tested with a 2-meter antenna used with MMCRs at other ARM sites. This pre-operational test will help uncover any data anomalies prior to the KAZR being installed in its new home in the shelter on the right when it replaces the MMCR. The KAZR (left) is being tested with a 2-meter antenna used with MMCRs at other ARM sites. This pre-operational test will help uncover any data anomalies prior to the KAZR being installed in its new home in the shelter on the right when it replaces the MMCR. In mid-December 2010, a new Ka-band ARM zenith radar (KAZR) began a two-week pre-operational test alongside the ARM millimeter wavelength cloud radar (MMCR) at the Southern Great Plains site. This ushers in a new era

471

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2006 [Facility News] March 31, 2006 [Facility News] New Chief Scientist Leads Annual ARM Science Team Meeting Bookmark and Share Dr. Warren Wiscombe begins his presentation by introducing the members of his "Chief Scientist team"-a new approach for leading the ARM Science Team. Dr. Warren Wiscombe begins his presentation by introducing the members of his "Chief Scientist team"-a new approach for leading the ARM Science Team. With a new Chief Scientist at the helm, just over 300 ARM scientists and ARM infrastructure staff took part in the 16th ARM Science Team meeting held in Albuquerque, New Mexico, on March 27-31, 2006. After an initial day of focused meetings among the ARM Working Groups, Dr. David Thomassen, Acting Associate Director of DOE's Office of Biological and Environmental

472

The ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Aerial Facility ARM Aerial Facility in the Biomass Burn Observation Project (BBOP) 1 Beat Schmid, Technical Director Pacific Northwest National Laboratory Richland, WA Aircraft Technical Information Length: 19.4 m Wingspan: 23.9 m Height: 7.1 m Cabin space: 15.3 m 2 External probes (PMS cans): 8 Maximum gross weight: 16,330 kg Maximum Endurance: 9.5 hours Maximum Range: 4000 km Endurance with full payload: 4-5 hours Crew capacity: 7 max, 2 pilots + 3-5 scientists Cabin payload: 1,900 kg Research Power: 700A @ 28 VDC (incl. 85A @ 115 VAC, 60 Hz) Ceiling: 7.6 km G-1 (BMI owned, ARM base funded, PNNL based and managed, for the science community) AAF G-1 Plan 2013-17 Intensive Airborne Research in Amazonia (IARA) Manaus, Brazil PI: Scot Martin (Harvard)

473

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 [Facility News] May 15, 2008 [Facility News] North Slope of Alaska Site Hosts Guest Instruments for Arctic Aerosol Study Bookmark and Share In addition to airborne measurements obtained at the North Slope of Alaska for the Indirect and Semi-direct Aerosol Campaign (ISDAC) in April, the ARM site in Barrow also hosted several guest instruments throughout the campaign. Measurements from these additional instruments will provide important supplementary data to the continuous data collected at Barrow for investigating the role of aerosol physics and chemistry in regulating cloud microphysical properties in the Arctic. In particular, they will enhance the ISDAC data set with specific information about cloud and aerosol properties, aerosol indirect effects, precipitation, visibility

474

Deputy Secretary Poneman's Remarks at the Nuclear Energy Assembly...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assembly - As Prepared for Delivery Deputy Secretary Poneman's Remarks at the Nuclear Energy Assembly - As Prepared for Delivery May 11, 2011 - 6:01pm Addthis Deputy...

475

Los Alamos shares Nano 50 award for directed assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano 50 award for directed assembly Los Alamos shares Nano 50 award for directed assembly Nano 50 Awards recognize "the top 50 technologies, products, and innovators that have...

476

Self-Assembly of Polymer Nano-Elements on Sapphire  

NLE Websites -- All DOE Office Websites (Extended Search)

Self-Assembly of Polymer Nano-Elements on Sapphire Print Self-assembly of polymers promises to vastly improve the properties and manufacturing processes of nanostructured...

477

Layer-by-Layer Assembled Thin Films for Battery Electrolytes  

Science Conference Proceedings (OSTI)

Presentation Title, Layer-by-Layer Assembled Thin Films for Battery Electrolytes ... Abstract Scope, Exponential layer-by-layer (eLBL) assembled battery...

478

Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear...

479

Low thermal resistance power module assembly - Energy Innovation ...  

A power module assembly (400) with low thermal resistance and enhanced heat dissipation to a cooling medium. The assembly includes a heat sink or spreader plate (410 ...

480

Public Facilities Guidebook  

Science Conference Proceedings (OSTI)

This "Guidebook" provides a basic guide to electric solutions for typical problems encountered in public facilities. The "Guidebook" introduces technologies that can improve energy service quality, reduce energy costs, improve building occupant satisfaction, increase building occupant productivity, and enhance environmental protection. The "Guidebook" suggests practical measures for applying state-of-the-art electric technology to existing buildings as well as to modern and new buildings. The document al...

2001-02-13T23:59:59.000Z

Note: This page contains sample records for the topic "assembly facility cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

BIOLOGICAL IRRADIATION FACILITY  

DOE Patents (OSTI)

A facility for irradiating biological specimens with neutrons is described. It includes a reactor wherein the core is off center in a reflector. A high-exposure room is located outside the reactor on the side nearest the core while a low-exposure room is located on the opposite side. Means for converting thermal neutrons to fast neutrons are movably disposed between the reactor core and the high and low-exposure rooms. (AEC)

McCorkle, W.H.; Cern, H.S.

1962-04-24T23:59:59.000Z

482

Environmental Assessment of Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 0 DOEEA-0930 Environmental Assessment of Facility Operations at the US. Department of Energy Grand Junction Projects Off ice, Grand Junction, Colorado June 1996 U S . Deparfment of Energy Grand Junction Projects Office Approved for public release; distribution is unlimited. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I U.S. DEPARTMENT OF ENERGY Finding of No Significant Impact, Facility Operations at the U . S . Department of Energy Grand Junction Projects Office, Grand Junction, Colorado AGENCY: U.S. Department of Energy ACTION Finding of No Sigdkant Impact SUMMARY: The U.S. Department of Energy (DOE) has prepared a sitewide o S T ~ environmental assessment (EA) @OE/EA-0930) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects office (GJPO) facility

483

Hot Hydrogen Test Facility  

DOE Green Energy (OSTI)

The core in a nuclear thermal rocket will operate at high temperatures and in hydrogen. One of the important parameters in evaluating the performance of a nuclear thermal rocket is specific impulse, ISp. This quantity is proportional to the square root of the propellants absolute temperature and inversely proportional to square root of its molecular weight. Therefore, high temperature hydrogen is a favored propellant of nuclear thermal rocket designers. Previous work has shown that one of the life-limiting phenomena for thermal rocket nuclear cores is mass loss of fuel to flowing hydrogen at high temperatures. The hot hydrogen test facility located at the Idaho National Lab (INL) is designed to test suitability of different core materials in 2500C hydrogen flowing at 1500 liters per minute. The facility is intended to test non-uranium containing materials and therefore is particularly suited for testing potential cladding and coating materials. In this first installment the facility is described. Automated Data acquisition, flow and temperature control, vessel compatibility with various core geometries and overall capabilities are discussed.

W. David Swank

2007-02-01T23:59:59.000Z

484

High aspect ratio, remote controlled pumping assembly  

DOE Patents (OSTI)

A miniature dual syringe-type pump assembly is described which has a high aspect ratio and which is remotely controlled, for use such as in a small diameter penetrometer cone or well packer used in water contamination applications. The pump assembly may be used to supply and remove a reagent to a water contamination sensor, for example, and includes a motor, gearhead and motor encoder assembly for turning a drive screw for an actuator which provides pushing on one syringe and pulling on the other syringe for injecting new reagent and withdrawing used reagent from an associated sensor. 4 figs.

Brown, S.B.; Milanovich, F.P.

1995-11-14T23:59:59.000Z

485

LINX Test Facility at SLAC  

NLE Websites -- All DOE Office Websites (Extended Search)

LINX LINear collider X-ing Linear Collider Interaction Region Engineering Test Facility at SLAC The NLC collaboration is proposing to create the LINX test facility at SLAC to...

486

Facilities & Capabilities | Nuclear Science | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Irradiated Material Examination and Testing (IMET) Facility was designed and built as a hot cell facility. It is a two-story block and brick structure with a two-story high bay...

487

LANL MOX fuel lead assemblies data report for the surplus plutonium disposition environmental impact statement  

SciTech Connect

The purpose of this document is to support the US Department of Energy (DOE) Fissile Materials Disposition Program`s preparation of the draft surplus plutonium disposition environmental impact statement. This is one of several responses to data call requests for background information on activities associated with the operation of the lead assembly (LA) mixed-oxide (MOX) fuel fabrication facility. LANL has proposed an LA MOX fuel fabrication approach that would be done entirely inside an S and S Category 1 area. This includes receipt and storage of PuO{sub 2} powder, fabrication of MOX fuel pellets, assembly of fuel rods and bundles, and shipping of the packaged fuel to a commercial reactor site. Support activities will take place within both Category 1 and 2 areas. Technical Area (TA) 55/Plutonium Facility 4 will be used to store the bulk PuO{sub 2} powder, fabricate MOX fuel pellets, assemble rods, and store fuel bundles. Bundles will be assembled at a separate facility, several of which have been identified as suitable for that activity. The Chemistry and Metallurgy Research Building (at TA-3) will be used for analytical chemistry support. Waste operations will be conducted in TA-50 and TA-54. Only very minor modifications will be needed to accommodate the LA program. These modifications consist mostly of minor equipment upgrades. A commercial reactor operator has not been identified for the LA irradiation. Postirradiation examination (PIE) of the irradiated fuel will take place at either Oak Ridge National Laboratory or ANL-W. The only modifications required at either PIE site would be to accommodate full-length irradiated fuel rods. Results from this program are critical to the overall plutonium distribution schedule.

Fisher, S.E.; Holdaway, R.; Ludwig, S.B. [and others

1998-08-01T23:59:59.000Z

488

LOFT facility and test program  

SciTech Connect

The Loss-of-Fluid Test (LOFT) test facility, program objectives, and the experiments planned are described. The LOFT facility is related to the smaller Semiscale facility and the larger commercial pressurized water reactors. The fact that LOFT is a computer model assessment tool rather than a demonstration test is emphasized. Various types of reactor safety experiments planned through 1983 are presented.

McPherson, G.D.

1979-11-01T23:59:59.000Z

489

Office of Nuclear Facility Safety Programs: Nuclear Facility Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety (HS-30) Safety (HS-30) Office of Nuclear Safety Home » Directives » Nuclear and Facility Safety Policy Rules » Nuclear Safety Workshops Technical Standards Program » Search » Approved Standards » Recently Approved » RevCom for TSP » Monthly Status Reports » Archive » Feedback DOE Nuclear Safety Research & Development Program Office of Nuclear Safety Basis & Facility Design (HS-31) Office of Nuclear Safety Basis & Facility Design - About Us » Nuclear Policy Technical Positions/Interpretations » Risk Assessment Working Group » Criticality Safety » DOE O 420.1C Facility Safety » Beyond Design Basis Events Office of Nuclear Facility Safety Programs (HS-32) Office of Nuclear Facility Safety Programs - About Us » Facility Representative Program