National Library of Energy BETA

Sample records for ashtabula environmental management

  1. DOE - Office of Legacy Management -- Ashtabula

    Office of Legacy Management (LM)

    for maintaining records for the Ashtabula site was transferred to DOE's Office of Legacy Management in 2010. The site requires records management and stakeholder support. For...

  2. Ashtabula III | Open Energy Information

    Open Energy Info (EERE)

    III Jump to: navigation, search Name Ashtabula III Facility Ashtabula III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer NextEra Energy...

  3. Ashtabula II Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    II Wind Farm Jump to: navigation, search Name Ashtabula II Wind Farm Facility Ashtabula II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  4. Life Cycle Analysis for Treatment and Disposal of PCB Waste at Ashtabula and Fernald

    SciTech Connect (OSTI)

    Morris, M.I.

    2001-01-11

    This report presents the use of the life cycle analysis (LCA) system developed at Oak Ridge National Laboratory (ORNL) to assist two U.S. Department of Energy (DOE) sites in Ohio--the Ashtabula Environmental Management Project near Cleveland and the Fernald Environmental Management Project near Cincinnati--in assessing treatment and disposal options for polychlorinated biphenyl (PCB)-contaminated low-level radioactive waste (LLW) and mixed waste. We will examine, first, how the LCA process works, then look briefly at the LCA system's ''toolbox,'' and finally, see how the process was applied in analyzing the options available in Ohio. As DOE nuclear weapons facilities carry out planned decontamination and decommissioning (D&D) activities for site closure and progressively package waste streams, remove buildings, and clean up other structures that have served as temporary waste storage locations, it becomes paramount for each waste stream to have a prescribed and proven outlet for disposition. Some of the most problematic waste streams throughout the DOE complex are PCB low-level radioactive wastes (liquid and solid) and PCB low-level Resource Conservation and Recovery Act (RCRA) liquid and solid wastes. Several DOE Ohio Field Office (OH) sites have PCB disposition needs that could have an impact on the critical path of the decommissioning work of these closure sites. The Ashtabula Environmental Management Project (AEMP), an OH closure site, has an urgent problem with disposition of soils contaminated by PCB and low-level waste at the edge of the site. The Fernald Environmental Management Project (FEMP), another OH closure site, has difficulties in timely disposition of its PCB-low-level sludges and its PCB low-level RCRA sludges in order to avoid impacting the critical path of its D&D activities. Evaluation of options for these waste streams is the subject of this report. In the past a few alternatives for disposition of PCB low-level waste and PCB low-level RCRA

  5. Environmental Management

    ScienceCinema (OSTI)

    None

    2015-01-07

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  6. Environmental Management

    SciTech Connect (OSTI)

    2014-11-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  7. M E Environmental Management Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D

  8. DOE - Office of Legacy Management -- Ashtabula

    Office of Legacy Management (LM)

    Links All documents are Adobe Acrobat files. pdficon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Submit a FOIA Request for...

  9. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  10. ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT

    Office of Environmental Management (EM)

    ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup

  11. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  12. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Review of the Environmental Management Waste Management Facility (EMWMF) at Oak Ridge ... INTRODUCTION The Environmental Management Waste Management Facility (EMWMF) is a land ...

  13. Environmental Management Advisory Board (EMAB) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board ...

  14. Multimedia environmental management

    SciTech Connect (OSTI)

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; and environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.

  15. E M Environmental Management

    Office of Environmental Management (EM)

    E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us ...

  16. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  17. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Environmental Management (EM)

    Manager | Department of Energy Webinar: Introducing Waste & Materials Tracking in Portfolio Manager ENERGY STAR Webinar: Introducing Waste & Materials Tracking in Portfolio Manager September 15, 2016 1:00PM to 2:00PM EDT Hosted by the U.S. Environmental Protection Agency's (EPA's) ENERGY STAR, this webinar will show how to track your building's waste and materials management. It will introduce the types of waste and disposal methods attendees can track, new metrics and reports, and

  18. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  19. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Update and Discussion of Charges to the Board Mark Whitney, Principal Deputy Assistant Secretary for Environmental Management 2:30 p.m. Break 2:45 p.m. Public Comment Period ...

  20. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  1. Comprehensive Environmental Management Process

    SciTech Connect (OSTI)

    Hjeresen, D.L.; Roybal, S.L.

    1994-08-01

    This report contains information about Los Alamos National Laboratory`s Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes.

  2. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions are available for download ...

  3. Summary - Environmental Management Waste Management Facility...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for ...

  4. Environmental Management Associates | Open Energy Information

    Open Energy Info (EERE)

    Environmental Management Associates Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website: www.emacorp.com Environmental Management...

  5. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  6. Business Opportunities Session Office of Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up PDF icon Business Opportunities ...

  7. PNNL: About - Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  8. Environmental Management Advisory Board Subcommittees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMAB Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE ...

  9. Environmental management activities

    SciTech Connect (OSTI)

    1997-07-01

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

  10. Categorical Exclusion Determinations: Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued ...

  11. Inspection Report: INS-L-01-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-05 Inspection Report: INS-L-01-05 June 15, 2001 Letter Report, Environment, Safety & Health Issues at the Ashtabula Environmental Management Project The purpose of this report is to make you aware of issues that came to our attention during recent Office of Inspector General (OIG) inspection activity at the Ashtabula Environmental Management Project (Ashtabula). Inspectors visited Ashtabula during the week of April 30, 2001, and we concluded that certain conditions at Ashtabula may

  12. SUSTAINABILITY SUPERSTAR Environmental Management's

    Energy Savers [EERE]

    Environmental Management's Donna Green is retiring! Donna began her DOE career at Argonne National Lab in 1998 before moving to EM in 2008 and quickly assuming the lead on their Sustainability program. She has led the charge to integrate sustainable practices into all aspects of the EM mission, and is one of the 2012 DOE Sustainability Award winners for that effort. We wish her well in her new endeavors! Send us your champion! SUSTAINABILITY NEWS 11 DOE Sites Win Awards in EPA 2012 Federal

  13. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  14. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald ...

  15. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports ...

  16. Environmental Management Associates | Open Energy Information

    Open Energy Info (EERE)

    Environmental Management Associates (Redirected from EMA Associates) Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website:...

  17. DOE - Office of Legacy Management -- Fernald Environmental Management...

    Office of Legacy Management (LM)

    Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation ...

  18. Environmental Management (EM) Cleanup Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  19. ISO 14000 environmental management standard

    SciTech Connect (OSTI)

    Block, M.R.

    1995-12-01

    National standards organizations around the world are developing an environmental management standard to help organizations address significant environmental aspects of their activities. This standard, designated ISO 14000, will provide guidance for environmental management systems: environmental audits: Environmental performance evaluation: Environmental labeling and life-cycle assessment. The environmental management system specification, the lynch-pin of ISO 14000, will be published as an international standard in early 1996. Audit documents will follow shortly thereafter. Although conformance to ISO 14000 will be voluntary, US multinational companies are likely to discover that failure to participate creates trade barriers in Europe. The Environmental Commission created by NAFTA also is considering whether to make adherence to ISO 14000 a condition of trade. This presentation will provide an understanding of the ISO process to create the standard, key elements of ISO 14000, and implications for US companies. Such an understanding will enable organizations to determine whether adoption of ISO 14000 is strategically sound.

  20. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  1. Keynote Address: Update on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Address: Update on Environmental Management Keynote Address: Update on Environmental Management Keynote presentation made by David G. Huizenga for the NTSF annual meeting held from ...

  2. Transition of Sites from Environmental Management Memorandum...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from ...

  3. Environmental Management and Remediation Committee Roster | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management and Remediation Committee Roster Environmental Management and Remediation Committee Roster List of NNMCAB members that participate on the Environmental Monitoring and ...

  4. Waste Management Programmatic Environmental Impact Statement...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) ...

  5. Advanced simulation capability for environmental management ...

    Office of Scientific and Technical Information (OSTI)

    environmental management (ASCEM): An overview of initial results Citation Details In-Document Search Title: Advanced simulation capability for environmental management (ASCEM): An ...

  6. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report to the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted ...

  7. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  8. Environmental Management Consolidated Business Center (EMCBC) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Services » Program Management » Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) SITE OVERVIEW The Department of Energy (DOE) established the EMCBC in Cincinnati, OH, on June 7, 2004, to provide Environmental Management customers with required and improved business and technical support services. Establishing the EMCBC allowed EM's Closure

  9. ORO Names New Assistant Manager for Environmental Management

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Oak Ridge Office names John Eschenberg as its Assistant Manager for Environmental Management.

  10. The Office of Environmental Management Non-Defense Environmental Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Non-Defense Environmental Cleanup The Office of Environmental Management Non-Defense Environmental Cleanup Microsoft Word - 8E2A4440.doc (100.45 KB) More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D

  11. Environmental Management Science Program Workshop

    SciTech Connect (OSTI)

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  12. Audit Report: IG-0541 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Audit Report: IG-0541 January 15, 2002 Remediation and Closure of the Ashtabula Environmental Management Project The RMI Titanium Company's Earthline Technology Division (RMI) is the Department of Energy's environmental restoration contractor at the Ashtabula Environmental Management Project (AEMP) in Ashtabula, Ohio. RMI owns the Ashtabula property, formerly known as the RMI Extrusion Plant, where the firm processed uranium for the Department and its predecessor agencies. In March 1993, the

  13. Audit Report: IG-0542 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Audit Report: IG-0542 January 28, 2002 Soil Washing at the Ashtabula Environmental Management Project The RMI Titanium Company's Earthline Technology Division (RMI) is the Department of Energy's (Department) environmental restoration contractor at the Ashtabula Environmental Management Project (AEMP) in Ashtabula, Ohio. RMI owns the Ashtabula property, formerly known as the RMI Extrusion Plant, where the firm processed uranium for the Department and its predecessor agencies. In March 1993, the

  14. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. DOE Office of Environmental Management Contract and Project Management

  15. PIA - Environmental Management Consolidated Business Center (EMCBC) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) (3.42 MB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 LM Records Handling System (LMRHS01) - Rocky

  16. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    the hazardous waste in the uranyl nitrate hexahydrate (UNH) System Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection...

  17. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center (OSTI)

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  18. Alaska Tribal Conference on Environmental Management

    Broader source: Energy.gov [DOE]

    The Alaska Tribal Conference on Environmental Management is hosting its annual gathering that bring together tribes, nonprofits, and state and federal organizations for a week of environmental conversations.

  19. Environmental Management Science Education and Internship Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental worker near water Oak Ridge Office of Environmental Management offers students and recent college graduates opportunities to learn about the mission of the DOE-EM...

  20. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation ...

  1. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

    Tim Jackson (208) 526-8484 For Immediate Release May 29, 2014 Public invited to comment on Draft Environmental Assessment on the Disposition of Five Signature Properties at Idaho National Laboratory The

  2. Department of Energy Idaho - Environmental Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final...

  3. Environmental Resources Management ERM | Open Energy Information

    Open Energy Info (EERE)

    Resources Management ERM Jump to: navigation, search Name: Environmental Resources Management (ERM) Place: United Kingdom Sector: Services Product: ERM is a provider of consulting...

  4. Hanford Site environmental management specification

    SciTech Connect (OSTI)

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  5. Alaska Tribal Conference on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Tribal Conference on Environmental Management Alaska Tribal Conference on Environmental Management October 26, 2015 8:00AM PDT to October 29, 2015 5:00PM PDT Anchorage,...

  6. Environmental Management Performance Report 11/1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  7. WIPP Documents - Environmental Management and Sustainability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy Statement DOE/WIPP 04-3310, Rev 6 Environmental Management System Description DOE/WIPP-05-3318, Rev 6 WIPP Site Sustainability Plan DOE/WIPP-14-3542

  8. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) HANFORD Application No. (Please leave blank) MEMBERSHIP APPLICATION (December 2015)...

  9. Line Management Perspective: Office of Environmental Management (EM)

    Broader source: Energy.gov [DOE]

    Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control.

  10. Environmental Management Advisory Board Subcommittees | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EMAB » Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE PURPOSE: The Subcommittee will provide advice, information, and recommendations to the Assistant Secretary for Environmental Management (EM) relating to project management. Although, EM has a solid performance record for cleanup projects, EM must improve its ability to deliver all projects within cost and on

  11. FY 2015 Environmental Management Budget Request to Congress ...

    Office of Environmental Management (EM)

    Environmental Management Budget Request to Congress FY 2015 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2015 ...

  12. Protocol_for_Environmental_Management_Cleanup_Projects_(clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf PDF icon ProtocolforEnvironmentalManagement...

  13. FY 2012 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Environmental Management Budget Request to Congress FY 2012 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2012 ...

  14. FY 2014 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Budget Request to Congress FY 2014 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2014 ...

  15. FY 2010 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Environmental Management Budget Request to Congress FY 2010 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2010 ...

  16. DOE - NNSA/NFO -- Photo Library Environmental Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Photo Library - Environmental Management The Environmental Management Program VisionMission ...

  17. 2012 Annual Planning Summary for Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management 2012 Annual Planning Summary for Environmental Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 ...

  18. The Office of Environmental Management (EM) Defense Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense ... Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. ...

  19. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  20. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Systems Environmental Management Systems DOE uses Environmental Management Systems already in place at DOE facilities as a management framework to determine and achieve sustainability goals and targets. The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, directs agencies to continue implementation of formal EMS where those systems have

  1. Hanford Site Environmental Management Specification

    SciTech Connect (OSTI)

    DAILY, J.L.

    2001-05-25

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  2. OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

  3. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    OAK RIDGE SITE SPECIFIC ADVISORY BOARD Application No. (Please leave blank) ______________ MEMBERSHIP APPLICATION ________________________________________________________________________________________________ The EM SSAB provides a meaningful opportunity for collaborative dialogue among the diverse communities at the Department of Energy (DOE) Environmental Management (EM) clean-up sites. At the request of the Assistant Secretary or the Site Manager/Assistant Manager for Environmental

  4. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Info (EERE)

    Environmental Management and Planning Solutions, Inc Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation: EMPSi Website:...

  5. 2013 Annual Planning Summary for the Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Consolidated Business Center 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center The ongoing and projected...

  6. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  7. Joint Environmental Management System (EMS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The

  8. 2014 Annual Planning Summary for the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Environmental Management.

  9. Advanced Simulation Capability for Environmental Management (ASCEM) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) ASCEM is being developed to provide a tool and approach to facilitate robust and standardized development of performance and risk assessments for cleanup and closure activities throughout the EM complex. The ASCEM team is composed of scientists from eight National

  10. Categorical Exclusion Determinations: Environmental Management | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE FOR DOWNLOAD October 13, 2011 CX-006923: Categorical Exclusion Determination Design and Install a Modification to the HB-Line Exhaust Fan Dampers CX(s) Applied: B2.5 Date: 10/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management October 13, 2011 CX-006920: Categorical Exclusion Determination Install

  11. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  12. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  13. Fernald Environmental Management Project Director's Findings...

    Office of Environmental Management (EM)

    minimize potential environmental impacts to Paddy's Run, a best management practices (BMP) plan for the control of industrial wastes and other wastes that may be discharge from ...

  14. Environmental Management Performance Reports - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statements Environmental Management Performance Reports FY 2016 Reports FY 2015 Reports FY 2014 Reports FY 2013 Reports FY 2012 Reports FY 2011 Reports FY 2010 ...

  15. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  16. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  17. Vermont Department of Environmental Conservation, Watershed Management...

    Open Energy Info (EERE)

    Strategy Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division Surface Water...

  18. Vermont Department of Environmental Conservation, Watershed Management...

    Open Energy Info (EERE)

    Strategy Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division...

  19. Contract Awarded for Environmental Management Consolidated Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Consolidated Business Center Mission Support Contract Awarded for ... DeliveryIndefinite Quantity (IDIQ) contract to SUNSi JV, LLC, of Pocatello, ID. ...

  20. Frequently Asked Questions | Environmental Management Science...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Frequently Asked Questions About the Oak Ridge Environmental Management Science Education and Internship Program 1. What kind of program is the OREM Science Education and...

  1. SRNS Environmental Management System External Audit | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon SRNS Environmental Management System External Audit More Documents & Publications ARRA Interfaces with the 2009 SRNS ISMS Phase 2 Verification SRNS-PROCUREMENT-CYCLE-SYSTE...

  2. Environmental Management Los Alamos Field Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alamos National Laboratory in northern New Mexico. The Environmental Management Los Alamos Field Office (EM-LA) is located at Los Alamos National Laboratory in northern New Mexico. ...

  3. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    Ridge Office of Environmental Management (OREM) East Tennessee Technology Park Portfolio Plan Jim Kopotic Portfolio Federal Project Director East Tennessee Technology Park...

  4. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT

    Office of Scientific and Technical Information (OSTI)

    Key words: Environmental management; Simulation; Model; ... (GS-3, GS-4). 5. Develop predictive capabilities to ... to queue systems that control access Usability ...

  5. Environmental Management Performance Report July 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  6. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 ...

  7. Integrated Safety Management and Environmental Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory | Department of Energy Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory (265.91 KB) More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA -

  8. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management

  9. Competitive energy management and environmental technologies: Proceedings

    SciTech Connect (OSTI)

    1995-03-01

    This book contains the proceedings of the 17th World Energy Engineering Congress 4th Environmental Technology Expo held in December of 1994. The topics of the papers presented at this meeting include environmental management, water resource efficiency, energy management strategies, advances in lighting efficiency and applications, HVAC systems, competitive power technologies, federal energy management programs, and demand-side management. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  10. Department of Energy Office of Environmental Management 2015...

    Office of Environmental Management (EM)

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental...

  11. FY 2016 Environmental Management Budget Request to Congress ...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2015 Environmental ...

  12. Department of Energy Office of Environmental Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental ...

  13. Categorical Exclusion Determinations: Environmental Management Consolidated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Service Center | Department of Energy Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued by Environmental Management Consolidated Business Service Center. DOCUMENTS AVAILABLE FOR DOWNLOAD No downloads found for this office.

  14. FY 2009 Environmental Management Budget Request to Congress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy FY 2009 Environmental Management Budget Request to Congress FY 2009 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2009 Congressional Budget Request Department of Energy - Environmental Management FY 2009 Congressional Budget Request (3.67 MB) More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2010 Environmental Management

  15. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect (OSTI)

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  16. FY 2011 Environmental Management Budget Request to Congress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2011 Congressional Budget Request Department of Energy - Environmental Management FY 2011 Congressional Budget Request (2.65 MB) More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2016

  17. DOE - Office of Legacy Management -- Fernald Environmental Management

    Office of Legacy Management (LM)

    Project - 027 Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project // Feed Materials Production Center (OH.12) (027) Remediated; managed by DOE LM. More information at http://www.lm.doe.gov/fernald/Sites.aspx Designated Name: Not Designated under FUSRAP Alternate Name: Fernald, OH, Site; Fernald Preserve Location: Hamilton, Ohio Evaluation Year: Not considered for FUSRAP - in another program Site Operations: Uranium processing

  18. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Environmental Management Office of Environmental Management Energy By The Numbers: Recovery Act EM's Paducah Site Completes Building Removals Savannah River Site Museum Ribbon Cutting F Reactor Inspection SRNL Laboratory Directed Research and Development Poster Session 351 Substation Demolition -- B Roll Hanford F Reactor Inspection B-roll footage Energy Secretary Talks About SRNL Hanford workers begin cleaning out historic McCluskey Room Traffic Safety Demo of below ground site that

  19. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee September 2015 Additional Evaluations: In addition to the evaluation of the strategic planning tool, the EMAB Risk Communications Subcommittee had presentations of other studies and tools currently in use or under development at various DOE cleanup sites to understand their current or

  20. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  1. US - Former Soviet Union environmental management activities

    SciTech Connect (OSTI)

    1995-09-01

    The Office of Environmental Management (EM) has been delegated the responsibility for US DOE`s cleanup of nuclear weapons complex. The nature and the magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. This booklet makes comparisons and describes coordinated projects and workshops between the USA and the former Soviet Union.

  2. PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) |

    Energy Savers [EERE]

    Department of Energy PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) A briefing to the SEAB Task Force on Technology Development for Environmental Management on the DOE Ofiice of Environmental Management. Overview of the Office of Environmental Management (2.12 MB) Overview of the Office of Environmental Management's Technology Development Program (658.68 KB) More Documents & Publications OREM

  3. Oak Ridge Office of Environmental Management

    Broader source: Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  4. Office of Environmental Management Taps Small Business for Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant...

  5. FY 2013 Environmental Management Budget Request to Congress ...

    Energy Savers [EERE]

    FY 2013 Environmental Management Budget Request to Congress (4.02 MB) More Documents & Publications FY 2015 Environmental Management Budget Request to Congress FY 2011 ...

  6. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Info (EERE)

    Environmental Management and Planning Solutions, Inc (Redirected from EMPSi) Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation:...

  7. The New Gold Standard: Environmental Management Introduces the...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold ...

  8. Annex IV Environmental Webinar: Adaptive Management in the Marine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy Industry Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy ...

  9. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  10. Environmental Management Internships | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Minority Serving Institution (MSI) MSIs are institutions of higher education enrolling populations with significant percentages of undergraduate minority students. Eligible Minority Serving Institutions Featured Videos Student Intern: Water Table Management Student Intern: Citizen Science Student Intern: Non-Traditional Water Resources Contact undergrad@anl.gov Environmental Management Internships Minority Serving Institutions Partnership Program (MSIPP) The Minority Serving Institutions

  11. Environmental Management Waste Management Facility (EMWMF) at Oak Ridge

    Office of Environmental Management (EM)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  12. 2011 Annual Planning Summary for Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

  13. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  14. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  15. Calendar Year 2002 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Savannah River Site June 7, 2002 Audit Report: IG-0558 Cost Sharing at the Ashtabula Environmental Management Project June 6, 2002 Audit Report: IG-0556 Nuclear Materials...

  16. Audit Report: IG-0558 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Sharing at the Ashtabula Environmental Management Project From 1952 through 1988, RMI Titanium Company (RMI), a private company, performed work for the Department of Energy and its...

  17. Environmental Management Performance Report April 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  18. Environmental Management Performance Report for December 1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  19. Environmental Management Performance Report November 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  20. Office of Environmental Management (EM) Organization Chart | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart (304.47 KB) More Documents & Publications Office of Environmental Management (EM) Organization Chart Portsmouth Paducah Project Office (PPPO) Organization Keynote Address DOE's Hydrogen and Fuel Cell Technologies Manufacturing Sub-Program

  1. Partnering Policy for the Office of Environmental Management | Department

    Office of Environmental Management (EM)

    of Energy Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management (448.69 KB) More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Microsoft Word - ADR Revised Policy82508Reformatted.doc OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution (CEQ, 2012)

  2. OSTIblog Articles in the Office of Environmental Management Topic | OSTI,

    Office of Scientific and Technical Information (OSTI)

    US Dept of Energy Office of Scientific and Technical Information Environmental Management

  3. Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management

    Broader source: Energy.gov [DOE]

    Full text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

  4. Environmental remediation and waste management information systems

    SciTech Connect (OSTI)

    Harrington, M.W.; Harlan, C.P.

    1993-12-31

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  5. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  6. Environmental planning and priorities for the manager

    SciTech Connect (OSTI)

    Eggleston, T.E. )

    1993-01-01

    Industry and government spend in excess of $100 billion each year on pollution control. These funds are producing cleaner land, air, and water. They have also spawned a pollution control industry which today employs more than 175,000 people. While significant, this is only the initial investment of capital and human talent that cleaning up the environment will demand through the 1990's and into the next century. Industry is in the early phases of an explosion of environmentally-oriented activity. Industries who manage their priorities and respond proactively on environmental issues will be the more profitable in an economy increasingly influenced by environmental regulations and consumer activism. A series of issues will most likely dominate management of environmental concerns, including: pollution prevention--reducing pollutants before having to clean them up; recycling--reuse limits disposal problems while reducing pollutants generated by new manufacturing; private-public partnerships--these contractual relationships between public and private partners will become increasingly popular; energy use although large strides have been made in energy conservation, much remains to be done; technology innovation--this is the most fundamental tool for use in improving environmental quality. In order for industry to respond to the need, government will have to implement a series of economic, environmental, and social policies. Business then becomes the key element in advancing the policies established by government.

  7. The Environmental Assessment Management modification of CADET

    Energy Science and Technology Software Center (OSTI)

    1996-05-01

    The original CADET system (finalized in September 1995 as version 1.3) is a data collection and transfer system developed for the Headquarters Air Force Space Command (HQAFSPC) Environmental Compliance Assessment and Management Program (ECAMP). The system was designed as a tool for ECAMP evaluators to use to enter compliance related data while in the field and to subsequently store, modify, sort, query, and print the data and to electronically transfer the data into the Airmore » Force''s Work Information Management System Environmental Subsystem (WIMSES). The original CADET system was designed to match the database structure of the WIMSES ECAMP module that came on-line in 1992. In June 1995, the Department of Defense issued The Environmental Assessment Management (TEAM) Guide and ECAMP Supplement to the TEAM Guide. These included changes to the type and amount of data collected during an ECAMP assessment. The WIMSES database structure was not modified to match the TEAM Guide; however, the need for collecting and storing the ECAMP data remained. The HQAFSC decided to modify the CADET system to incorporate the changes specified in the ECAMP Supplement and to convert the system from simply a data entry and transfer tool to a data entry and storage system to manage ECAMP findings in lieu of the WIMSES ECAMP module. The revised software is designated as version 2.0 and nicknamed TEAM CADET to distinguish it from the original CADET system.« less

  8. A Science Data Gateway for Environmental Management

    SciTech Connect (OSTI)

    Agarwal, Deborah, A; Faybishenko, Boris; Freedman, Vicky, L; Krishnan, Harinarayan; Kushner, Gary; Lansing, Carina; Porter, Ellen; Romosan, Alexandru; Shoshani, Arie; Wainwright, Haruko; Weidmer, Arthur; Wu, Kesheng

    2015-10-12

    Science data gateways are effective in providing complex science data collections to the world-wide user communities. In this paper we describe a gateway for the Advanced Simulation Capability for Environmental Management (ASCEM) framework. Built on top of established web service technologies, the ASCEM data gateway is specifically designed for environmental modeling applications. Its key distinguishing features include: (1) handling of complex spatiotemporal data, (2) offering a variety of selective data access mechanisms, (3) providing state of the art plotting and visualization of spatiotemporal data records, and (4) integrating seamlessly with a distributed workflow system using a RESTful interface. ASCEM project scientists have been using this data gateway since 2011.

  9. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  10. Analysis of DOE international environmental management activities

    SciTech Connect (OSTI)

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  11. Office of Environmental Management | Department of Energy

    Office of Environmental Management (EM)

    Office of Environmental Management DOE Recognizes Two EM Sites with Sustainability Awards DOE Recognizes Two EM Sites with Sustainability Awards WASHINGTON, D.C. - Teams at two EM sites have been recognized with 2016 Energy Sustainability Awards for spearheading projects that have saved taxpayer dollars while promoting efficiency and smart use of DOE resources. Read more DOE Chief of Staff to Provide Keynote at 2016 National Cleanup Workshop DOE Chief of Staff to Provide Keynote at 2016 National

  12. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Environmental Management DOE Recognizes Two EM Sites with Sustainability Awards DOE Recognizes Two EM Sites with Sustainability Awards WASHINGTON, D.C. - Teams at two EM sites have been recognized with 2016 Energy Sustainability Awards for spearheading projects that have saved taxpayer dollars while promoting efficiency and smart use of DOE resources. Read more Rep. Simpson to Speak at 2016 Cleanup Workshop Rep. Simpson to Speak at 2016 Cleanup Workshop WASHINGTON, D.C. - Rep. Mike

  13. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-12-31

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  14. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-10-01

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  15. User-centered guidelines for environmental management

    SciTech Connect (OSTI)

    Eike, D.R.; Fox, J.A.; Dailey, R.

    1993-08-01

    Environmental Management requirements facing US Department of Energy (DOE) facilities are detailed, complex, and often subject to rapid change. DOE`s Office of Environmental Guidance, RCRA/CERCLA Division (EH-231), is responsible for developing and issuing guidance to assist DOE facilities in interpreting and complying with Federal, State, and local requirements. Recognizing the potential for computerization of the guidance, EH-231 requested that Pacific Northwest Laboratory (PNL) develop an approach for preparing automated guidance. The approach developed by PNL, termed ``user-centered guidance,`` combines participatory design and traditional rapid prototyping techniques to produce a new form of environmental guidance that emphasizes the user`s needs. This paper describes the objectives, processes and current status of this effort.

  16. The Department of Energy's Use of the Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation ... meet volumetric concentration criteria for disposal at onsite solid waste landfills. ...

  17. Environmental Management Los Alamos Field Office Corrective Action...

    Energy Savers [EERE]

    for management of the environmental restoration and the ... Nuclear Security Administration Los Alamos Field Office (NA-LA) continues with the responsibility for the management of ...

  18. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  19. Waste Management Programmatic Environmental Impact Statement (WM PEIS)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports and Records of Decision | Department of Energy Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of radioactive wastes from past, present, and

  20. Office of Environmental Management: A Journey to Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence (5.44 MB) More Documents & Publications Assistant Secretary Triay's FY 2012 EM Budget Rollout Presentation Chairs Meeting - June 2011 2012 Congressional Nuclear Cleanup Caucus Briefings

  1. Letter: The Environmental Management SSABs Recommendations on Transuranic

    Office of Environmental Management (EM)

    Activities of the Environmental Management SSABs | Department of Energy Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter

  2. TECHNICAL INTEGRATION ENVIRONMENTAL MANAGEMENT FOCUS AREAS

    SciTech Connect (OSTI)

    Carey R. Butler

    2001-10-01

    This contract involved a team of companies led by WPI (formerly the Waste Policy Institute). In addition to WPI, the team included four subcontractors--TRW (formerly BDM Federal), SAIC, Energetics, and the University of North Dakota Energy and Environmental Research Center (EERC). The team of companies functioned as a ''seamless team'' assembled to support the Environmental Management Program Focus Areas. Staff resources were applied in the following offices: Richland, Washington, Idaho Falls, Idaho, Morgantown, West Virginia, Grand Forks, North Dakota, Aiken, South Carolina, Gaithersburg, Maryland, and Blacksburg, Virginia. These locations represented a mixture of site support offices at the field focus area locations and central staff to support across the focus areas. The management of this dispersed resource base relied on electronic communication links to allow the team to function as a ''virtual office'' to address tasks with the best qualified staff matched to the task assignments. A variety of tasks were assigned and successfully completed throughout the life of the contract that involved program planning and analysis, program execution, program information management and communication and data transmission.

  3. Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: EM Waste Management Facility ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for wastes generated by environmental restoration activities being conducted at the US Department of

  4. Environmental Management Performance Report June 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  5. Environmental Management Performance Report May 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  6. Environmental Management Performance Report March 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  7. Independent Oversight Assessment, DOE Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters - November 2012 | Department of Energy DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture at the Department of Energy's (DOE) Office of Environmental

  8. NETL-EERC ENVIRONMENTAL MANAGEMENT COOPERATIVE AGREEMENT

    SciTech Connect (OSTI)

    Christina B. Behr-Andres; Daniel J. Daly

    2001-07-31

    This final report summarizes the accomplishments of the 6-year Environmental Management Cooperative Agreement (EMCA) between the Energy and Environmental Research Center (EERC), a nonprofit, contract-supported unit of the University of North Dakota, and the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). The first portion of the report summarizes EMCA's structure, activities, and accomplishments. The appendix contains profiles of the individual EMCA tasks. Detailed descriptions and results of the tasks can be found separately in published Final Topical Reports. EMCA (DOE Contract No. DE-FC21-94MC31388) was in place from the fall of 1994 to the summer of 2001. Under EMCA, approximately $5.4 million was applied in three program areas to expedite the commercialization of 15 innovative technologies for application in DOE's EM Program ($3.8 million, or 69% of funds), provide technical support to the Deactivation and Decommissioning Focus Area (DDFA; $1.04 million, or 19% of funds), and provide for the coordination of the EMCA activities ($0.62 million, or 11% of funds). The following sections profile the overall accomplishments of the EMCA program followed by a summary of the accomplishments under each of the EMCA areas: commercialization, DDFA technical support, and management. Table 1 provides an overview of EMCA, including program areas, program activities, the duration and funding of each activity, and the associated industry partner, if appropriate.

  9. Environmental Management Advisory Board Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EMAB » Environmental Management Advisory Board Charter Environmental Management Advisory Board Charter The Environmental Management Advisory Board's (EMAB)'s most recent charter outlines the objective, structure, and scope of the Board. EMAB Charter (120.69 KB) More Documents & Publications EM SSAB Charter EM SSAB Conference Calls - September 19, 2011 EMAB Meeting - April 2009 Waste Management Nuclear Materials & Waste Tank Waste and Waste

  10. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  11. Resources of the future in environmental management

    SciTech Connect (OSTI)

    Bhada, R.K.; Morgan, D.; Jacquez, R.

    1994-12-31

    A major issue facing the generation and application of environmental technology is that of educating and training the work force that is needed to resolve the problems of the past and those for the next few decades. By necessity, this professional level workforce must have multidisciplinary education combined with research experience at the leading edge of technology. In order to satisfy this critical need, a unique type of organization was created for education and technology development in environmental areas. The Waste-management Education and Research Consortium (WERC) was created in 1990 by a cooperative agreement with the U.S. Department of Energy as a partnership of New Mexico State University, The University of New Mexico, and the New Mexico Institute of Mining and Technology in collaboration with Los Alamos National Laboratory and Sandia National Laboratories; the Navajo Community College joined as an affiliate in 1991. WERC has conclusively demonstrated that such a partnership collaborating with industry can be an effective tool to expand the nation`s resources to address issues related to the management of all forms of waste, via education, technology development and information transfer. The WERC program has implemented the following items: (1) College education at the technologist, undergraduate and graduate level; (2) Pre-college programs to involve young students in environmental activities; (3) Professional development and restraining series by satellite TV; (4) Technology development projects for solutions at the leading edge; (5) Four measurement and testing laboratories; (6) Technology transfer for information to communities, industry and government; (7) A University Design Contest for interaction between universities; and (8) A First Response Training Academy for emergency personnel. Currently this program is serving over 2000 students and professionals on an international bases.

  12. Environmental Management Assessment of the National Renewable Energy Laboratory (NREL)

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This report documents the results of the environmental management assessment performed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. The onsite portion of the assessment was conducted from September 14 through September 27, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). During this assessment, the activities conducted by the assessment team included reviews of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and NREL contractor personnel; and inspections and observations of selected facilities and operations. The environmental management assessment of NREL focused on the adequacy of environmental management systems and assessed the formality of programs employing an approach that recognizes the level of formality implementing environmental programs may vary commensurate with non-nuclear research and development operations. The Assessment Team evaluated environmental monitoring, waste management and National Environmental Policy Act (NEPA) activities at NREL, from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section of this report. The scope of the NREL Environmental Management Assessment was comprehensive and included all areas of environmental management. At the same time, environmental monitoring, waste management, and NEPA activities were evaluated to develop a programmatic understanding of these environmental disciplines, building upon the results of previous appraisals, audits, and reviews performed at the NREL.

  13. Mission & Functions Statement for the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government...

  14. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action No. 08-cv-01624 (February 27, 2012) | Department of Energy February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No.

  15. Comments at the DOE Environmental Management Budget Workshop

    Office of Environmental Management (EM)

    Action No. 08-cv-01624 (February 27, 2012) | Department of Energy February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No.

  16. Environmental Management System Steering Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members of the Laboratory's Executive Council on environmentally-related objects and targets to help meet the Laboratory's and DOE's sustainability goals. For more information please see http://www.ameslab.gov/operations/esha/environmental EMS Charter The current members of the committee include David Byrd (Science and

  17. In-Situ Decommissioning: A Strategy for Environmental Management |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy In-Situ Decommissioning: A Strategy for Environmental Management In-Situ Decommissioning: A Strategy for Environmental Management In-Situ Decommissioning (ISD) is an effective decommissioning practice offering a safe and environmentally-favorable alternative to completely demolishing a facility and transporting its debris elsewhere for disposal. Regulatory approval to decommission a facility through ISD is authorized primarily by the Environmental Protection Agency under

  18. Celebrating Successes of Environmental Management Recovery Act Projects

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management marked a milestone at the end of last month as they completed 84 American Recovery and Reinvestment Act-funded projects across America.

  19. Mr. Ken Blower, Manager Corporate Environmental Affairs Standard...

    Office of Legacy Management (LM)

    Ken Blower, Manager Corporate Environmental Affairs Standard Oil Company of Ohio Midland ... Research Laboratory (now Standard Oil Company of Ohio) to determine whether it ...

  20. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 APPENDIX V RECHARGE SENSITIVITY ANALYSIS In the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM...

  1. MEMORANDUM FOR JOHN R. ESCHENBERG ASSISTANT MANAGER FOR ENVIRONMENTAL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 ENVIRONMENTAL MANAGEMENT SUBJECT: Delegation of Acquisition Executive Authority for Capital Asset Projects at Oak Ridge Office In accordance with the guidelines of Department of...

  2. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  3. Establishing the Office of Environmental Management Quality Assurance Corporate Board

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM'S policy and guidance and promotes lessons...

  4. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  5. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect (OSTI)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  6. Environmental Management FY 2006 Budget Request DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Justice Environmental Justice The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations. This EO directs each Federal agency to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects

  7. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  8. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  9. US Department of Energy environmental management advisory board public meeting

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Contents of this publication include: list of participants; March 14, 1994--opening of public meeting and subcommittee reports, and public comment session; March 15, 1994--presentation by Thomas P. Grumbly, assistant secretary for environmental management, presentations by senior environmental management officials, and committee business.

  10. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD AGENDA Pacific Northwest...

    Broader source: Energy.gov (indexed) [DOE]

    Hanford Site Welcome Doug Shoop, Richland Operations Office Site Deputy Manager Kevin Smith, Office of River Protection Site Manager Susan Leckband, Hanford Advisory ...

  11. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect (OSTI)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  12. Role of the environmental management commission in North Carolina

    SciTech Connect (OSTI)

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  13. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  14. The Office of Environmental Management technical reports: A bibliography

    SciTech Connect (OSTI)

    1998-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

  15. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  16. Integrated Safety & Environmental Management System | Stanford Synchrotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Radiation Lightsource Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation

  17. Integrating Environmental, Safety, and Quality Management System Audits |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Integrating Environmental, Safety, and Quality Management System Audits Integrating Environmental, Safety, and Quality Management System Audits August 2009 Presenter: David Skipper, UT-Battelle Track 7-2 Topics Covered: External registration/validation of management systems is desirableUT-Battelle registrations ISO 9001 for isotope development process ISO 14001 for all UT-Battelle activities OHSAS 18001 for all UT-Battelle activities ISO 17025 for metrology laboratory

  18. DOE methods for evaluating environmental and waste management samples.

    SciTech Connect (OSTI)

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  19. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  20. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Waste U-233 - Uranium-233 UNF - Used Nuclear Fuel WIPP - Waste Isolation Pilot Plant WIR - Waste Incidental to Reprocessing WTP - Waste Treatment Plant 3 Environmental ...

  1. Integrating Environmental, Safety, and Quality Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    An Approach to Sustainability that Improves Environmental and Safety Performance Utilizing Bacteria for Sustainable Manufacturing of Low-Cost Nanoparticles Performance Analysis of ...

  2. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    ... Validation * Independent reviews dramatically increased - All Recovery Act scope had EIR, IPR or Program Review - Five acquisition management reviews in 2009 (V&V in 2010) - EM ...

  3. Advanced Simulation Capability for Environmental Management ...

    Office of Scientific and Technical Information (OSTI)

    The modular and open source high performance computing tool will facilitate integrated ... Country of Publication: United States Language: English Subject: 12 MANAGEMENT OF ...

  4. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  5. Definition of Environmental Management (EM) Completion

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2)...

  6. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    Environmental Contractor Mentors Young Students Environmental Contractor Mentors Young Students November 26, 2014 - 12:00pm Addthis Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Middle school students use water bottles and powdered drink mix to learn how contamination

  7. In-Situ Decommissioning: A Strategy for Environmental Management

    Office of Environmental Management (EM)

    In-Situ Decommissioning A Strategy for Environmental Management Reducing the Footprint of the Cold War For over a decade, the Department of Energy has focused on reducing the ...

  8. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Environmental Management (EM)

    Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge ... 2013 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. ...

  9. Environmental Enterprise Risk Management Benefits for a Government Contractor

    SciTech Connect (OSTI)

    Linda Guinn

    2012-05-01

    An often overlooked advantage that an Environmental Enterprise Risk Management System (ERMS) has to organizations is the added protection from the Civil False Claims Act (FCA) for activities under a government contract.

  10. The Office of Environmental Management Uranium Enrichment D&D...

    Energy Savers [EERE]

    Uranium Enrichment D&D The Office of Environmental Management Uranium Enrichment D&D Microsoft Word - B996F741.doc (100.04 KB) More Documents & Publications Microsoft Word - PSRP ...

  11. The New Gold Standard: Environmental Management Introduces the First LEED

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gold Industrial Facility | Department of Energy The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility September 13, 2012 - 1:02pm Addthis The 200 West Groundwater Treatment Facility is shown here after completion of construction this summer. | Photo courtesy of Zachary Carter with Mission Support Alliance (MSA) at Hanford. The 200 West Groundwater

  12. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  13. Environmental Management Scientist Sets His Sights on Mars | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  14. Acting Assistant Secretary for DOE Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project | Department of Energy Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project August 11, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE

  15. Oak Ridge Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Office of Environmental Management OREM supports local program fostering the next generation of environmental stewards OREM supports local program fostering the next generation of environmental stewards OREM and CRESO hosted media for a "turtle hunt" of Tennessee's state reptile, the Eastern Box Turtle. Today's event is just one example of how community partnerships are having a real-world impact, enabling Anderson County middle and high school students to participate in and

  16. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    12 - 93017 1.33B Waste Isolation Pilot Project Management and Operating Contract Cost plus award fee 5-Yr Option 100117 - 93022 Portage, Inc. DE-EM0004007 Base Period 116...

  17. Statement from DOE Assistant Secretary for Environmental Management James Rispoli on the National Academy of Public Administration's Management Review of DOE's Office of Environmental Management

    Broader source: Energy.gov [DOE]

    "Today the National Academy of Public Administration released their comprehensive management review of the Department of Energy's Office of Environmental Management (EM).  EM is a $5.6 billion per...

  18. 2014 Annual Planning Summary for the Environmental Management Energy Technology Engineering Center

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Environmental Management Energy Technology Engineering Center.

  19. 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Environmental Management Consolidated Business Center.

  20. 2014 Annual Planning Summary for the Oak Ridge Office of Environmental Management

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Oak Ridge Office of Environmental Management.

  1. The Office of Environmental Management technical reports: a bibliography

    SciTech Connect (OSTI)

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  2. Issuance of the Final Tank Closure and Waste Management Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement December 5, 2012 - 12:00pm Addthis Media Contacts Carrie Meyer, DOE (509) 376-0810 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management

  3. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  4. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect (OSTI)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  5. Ashtabula.PDF

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and was also using government laboratory equipment to analyze samples for ... The filter presses were initially requested as laboratory equipment in support of a soil ...

  6. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  7. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment

    SciTech Connect (OSTI)

    Irving, John S

    2003-04-01

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  8. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment - April 2003

    SciTech Connect (OSTI)

    Irving, J.S.

    2003-04-30

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  9. Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request

    Broader source: Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2018.

  10. Recommendation 228: Recommendations on the FY 2017 DOE Oak Ridge Environmental Management Budget Request

    Broader source: Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2017.

  11. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Office of Energy Efficiency and Renewable Energy (EERE)

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  12. Environmental Management Performance Report October 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-10-01

    This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures. and safety data is current as of August 31. Accomplishments, Issues and Integration items are current as of September 18 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2000 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

  13. DOE model conference on waste management and environmental restoration

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  14. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  15. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action No. 08-cv-01624 (October 18, 2011) | Department of Energy October 18, 2011) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). The Court has issued the injunctive relief described on pages 51-52 of the Order. U.S. District Court's Order of October 18, 2011, in Colorado

  16. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  17. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  18. Implications of pollution prevention experience for environmental management

    SciTech Connect (OSTI)

    Schramm, W.

    1993-06-01

    Conventional wisdom in the US is that firms face a trade-off between environmental efforts and profit because of the belief that environmental protection invariably involves costs that reduce profits. Firms, therefore, generally perceive environmental protection as an impediment to their goal of profit maximization. Environmental efforts are viewed as an added hurdle in producing a product, rather than an as intrinsic part of well-designed operations. From this perspective, firms have no incentive to engage in environmental protection efforts, and will do so only if they are forced (or are given incentives) by government or if they perceive in advance potential profits from their efforts (e.g., a market for environmental products). The concept of a trade-off between the environment and profit, however, has been challenged recently. A common argument raised for questioning this trade-off is that efforts directed at environmental protection will lead to the development of new technologies and will give US firms a competitive advantage in the emerging environmental industry. It is argued that opportunities available within this growth field outweigh costs of entry and research. Recent publications (World Wildlife Fund, 1992; Resources for the Future, 1993) have proposed that government actions, may encourage the development of the environmental industry and, thus, improve both economic and environmental performance. Suggested governmental actions include using market incentives rather than command and control regulation to achieve environmental goals, integrating environmental values into governmental policy analysis, and supporting investments in environmental technologies. This paper details the economics and benefits of various waste management efforts.

  19. U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Rev 1) 1 U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Report of Activities for May 22, 2014 Public Meeting Submitted by the EMAB Acquisition and Project Management Subcommittee (APMS) May 22, 2014 Background: The APMS presented its last written report on its efforts at the EMAB meeting on June 14, 2013. The public meeting scheduled for November 19, 2013 was cancelled because of scheduling issues with the partial government shutdown. The Subcommittee has continued to hold

  20. U.S. Department of Energy Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Implementation Guide Revision 1 August 2013 U.S. DOE Office of Environmental Management Revision 1, August 2013 TRA/TMP Process Implementation Guide Page 2 of 76 REVISION LOG Date Reason for Revision Revision 0, March 2008  Initial issue of EM guide Revision 1, August 2013  Updates based on lessons learned from completed TRAs  Incorporation of "working draft" appendices on TRL 7

  1. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  2. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    SciTech Connect (OSTI)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-02-26

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials.

  3. Aligning National Environmental Policy Act Process with Environmental Management Systems (CEQ, 2007)

    Broader source: Energy.gov [DOE]

    Aligning National Environmental Policy Act Process with Environmental Management Systems (EMS) is a guidebook for NEPA and EMS practitioners that identifies elements of an EMS that can improve NEPA implementation. Alignment of NEPA and EMS further enhances both NEPA's goals and the sustainability goals laid out in the Executive Order 13423: " to create and maintain conditions, under which humans and nature can exist in productive harmony, that permit fulfilling the social, economic, and other requirements of the present and future generations of Americans."

  4. Chasing a specter: Risk management for global environmental change

    SciTech Connect (OSTI)

    O'Riordan, T. ); Rayner, S. )

    1989-10-01

    Global environmental change is both a concept and a process that changes in meaning with scientific discovery, public concern, and political responsiveness. It is the relationship between the problems as perceived and the various institutions that help shape and adapt to such problems that defines global environmental change. There is a kind of race between scientific detective work and political adjustment to lessen the likely impacts that predictive science is trying to verify. Risk analysis, because of its capacity to recognize this relationship in many spheres of problem identification, can contribute to the political debate, mostly by proposing institutional redesign of the relationship among scientific research, public entry, and experimental readjustments to consensus formation and international action. This paper discusses the factors involved in global environmental change, the risk management involved, the holistic interpretation, and the environmental impacts. 21 refs., 5 figs., 5 tabs.

  5. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations.

  6. DOE TRANSCOM Technical Support Services DE-EM0002903 ATTACHMENT J-9: DOE OFFICE OF ENVIRONMENTAL MANAGEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATTACHMENT J-9: DOE OFFICE OF ENVIRONMENTAL MANAGEMENT FY 13 ANNUAL PERFORMANCE AGREEMENT FY13 Annual Performance Agreement U.S. Department of Energy Office of Environmental Management 11/28/2012 Office of Environmental Management Office of Environmental Management Page 2 Page Intentionally Blank Office of Environmental Management Page 3 FY 2013 Performance Agreement with the Senior Advisor for the Office of Environmental Management The Office of Environmental Management (EM) is working to

  7. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  8. Managing environmental information in the age of outsourcing.

    SciTech Connect (OSTI)

    Perkins, S.; Smith, K.; Whorton, M.; Williams, G.

    1999-03-08

    As more data gathering, analysis, and tracking tasks are outsourced the need for multiple contractors and military personnel to input, update, access, store, and track Mormation is becoming critical to efficient functioning and managing of environmental projects and programs at military installations. This paper presents two case studies detailing the way two organizations--the Rocky Mountain Arsenal (RMA) in Colorado, and the 611th Air Support Group (611 ASG) in Alaska--are managing complex data using web-based technology. RMA is involved in one of the largest environmental cleanup programs in the Department of Defense. As such, large volumes of environmental data and documents must be generates stored, and tracked. Often these documents are prepared by multiple contractors and are reviewed by several parties or groups. To manage environmental information and to ensure that it meets compliance requirements more efficiently, RMA has developed an electronic document tracking and distribution system. This system allows access to up-to-date information, including a detailed review of all pertinent regulatory and other requirements at RMA. The dynamic system includes milestones, review deadlines, submission deadlines, and other requirements for managing the environmental program. The 611 ASG manages more than 30 remote installations in Alaska, many of which are operated by contractor personnel. These installations contain hundreds of buildings that are constantly being modified because of exposure to harsh arctic climates; some of them have been determined to be eligible for the National Register of Historic Places. To meet regulatory requirements for cultural resources management as well as engineering requirements for upkeep of buildings, a database was developed to store and analyze building data. The database has a web-based interface that allows anyone with the correct access codes to input new data, modify existing data, or query the database using a number of

  9. Environmental Management Site-Specific Advisory Board Chairs Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 20-21, 2016 DoubleTree Hotel, 215 S. Illinois Ave., Oak Ridge, TN Wednesday, April 20 8:00 am Registration 8:30 am Welcome and Opening Remarks  David Borak, EM SSAB Designated Federal Officer  Warren Gooch, Mayor, City of Oak Ridge  Jay Mullis, Deputy Manager for Environmental Management, Oak Ridge  Belinda Price, Chair, Oak Ridge Site Specific Advisory Board 8:50 am Meeting Overview  Eric Roberts, Facilitator 9:00 am EM Program Update  Mark Whitney, Principal Deputy

  10. Closure & Waste Management Environmental Impact Statement (EfS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanlord 'fank Closure & Waste Management Environmental Impact Statement (EfS) ()ctober 2006 Hanford Tarrk Closure ancl Wtrste Management Environment Intpact Statement (EIS) Review Report REVI N,W AND .{P'PROVAN.: Prepared by: ' QualirY & SaIetY Divisio't ldaho OPerati ons Officc ...) Revievv Tcitnt Leadc, t / Ld'rtc&a'r* o^,*,ttl4t- Roberl C. Barr Director, Envimnmcnal, Safel, and QualitY Offics of Rirer Protection Approvcd by: t i i / D a r e : " ' / . i ' i / ; t ' Chief

  11. Microsoft Word - IG-0576.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspections Inspection Report Inspection of Nuclear Safety At The Ashtabula Environmental Management Project DOE/IG-0576 November 2002 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 November 26, 2002 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of Nuclear Safety at the Ashtabula Environmental Management Project" BACKGROUND The Office of Inspector General, U.S. Department of Energy (DOE), conducted an inspection

  12. Written Statement of David Huizenga Senior Advisor for Environmental Management

    Office of Environmental Management (EM)

    House of Representatives May 9, 2013 Good morning, Mr. Chairman, Ranking Member Cooper, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide the Members with an overview of the EM program, key accomplishments during the past year, 2013 planned accomplishments and progress to date, the projected impacts of sequestration, and planned accomplishments under the FY 2014 Request.

  13. Written Statement of David Huizenga Senior Advisor for Environmental Management

    Office of Environmental Management (EM)

    Senate May 8, 2013 Good afternoon, Mr. Chairman, Ranking Member Sessions, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide the Members with an overview of the EM program, key accomplishments during the past year, 2013 planned accomplishments and progress to date, the projected impacts of sequestration, and planned accomplishments under the FY 2014 Request. Overview of the

  14. United States-Russia: Environmental management activities, Summer 1998

    SciTech Connect (OSTI)

    1998-09-01

    A Joint Coordinating Committee for Environmental Restoration and Waste Management (JCCEM) was formed between the US and Russia. This report describes the areas of research being studied under JCCEM, namely: Efficient separations; Contaminant transport and site characterization; Mixed wastes; High level waste tank remediation; Transuranic stabilization; Decontamination and decommissioning; and Emergency response. Other sections describe: Administrative framework for cooperation; Scientist exchange; Future actions; Non-JCCEM DOE-Russian activities; and JCCEM publications.

  15. Technologies for improved soil carbon management and environmental quality

    SciTech Connect (OSTI)

    Reicosky, D.C.

    1997-12-31

    The objective of this paper is to create an environmental awareness of and to provide insight into the future balance of environment and economic issues in developing new technologies that benefit the farmer, the public, and agricultural product sales. Agricultural impacts of tillage-induced CO{sub 2} losses are addressed along with new and existing technologies to minimize tillage-induced flow of CO{sub 2} to the atmosphere, Emphasis is placed on the carbon cycle and the cost of environmental damage to illustrate the need for improved technologies leading to reduced environmental impacts by business ventures. New technologies and concepts related to methods of tillage and stover management for carbon sequestration with the agricultural production systems are presented. 16 refs., 3 figs.

  16. Including environmental concerns in management strategies for depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-12-31

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF{sub 6}) management program. The program is intended to find a long-term management strategy for the DUF{sub 6} that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE`s current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997.

  17. Environmental management during economic transition: Ukraine--A case study

    SciTech Connect (OSTI)

    Kempen van, T.H.; Demydenko, A.O.

    1995-12-01

    After dissolution of Soviet Union, each new States had to confront the legacy of an unsustainable, and ultimately failed, economic and political system. Enormous environmental problems resulted from centrally planned economics, which promoted rapid growth through exploitation of the former Soviet Union`s (FSU) vast natural resources. Unconstrained by scarcity-based pricing, extractive and heavy industry ministries created huge, inefficient, and heavily polluting enterprises. The region also experienced extensive forest-cutting, steady deterioration of soils, and contaminated runoff and infiltration from over-excessive application of agrichemicals. The fate of the environment will depend largely on successful transition to a market-based economy. Funds for environmental protection will remain scarce, and poor technology combined with a degraded and overworked infrastructure will slow cleanup of contaminated regions. With failed economies, policy-makers and legislators will be forced to overlook sustainable development as they exploit natural resources in an effort to produce food and obtain hard currency. Ukraine, the second-most populous republic of the FSU, experienced possibly the world`s greatest single environment disaster--the 1986 Chernobyl catastrophe. Today, heavy industry, with its resource-intensive and highly polluting technologies, contributes 61% of Ukraine`s GNP, in comparison with 34% in the European Union. Energy production is grossly inefficient. Environmental agencies in Ukraine are new, with limited legal or economic tools, financial resources, or technical skills. Yet the country has commenced environmental management initiatives that, when combined with economic reforms, will start to improve environmental conditions. This paper presents an overview of Ukraine`s environmental and economic conditions, steps already undertaken to manage the environment, and additional measures needed to improve the situation.

  18. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected

  19. United States Department of Energy Environmental Management Advisory Board: Public meeting

    SciTech Connect (OSTI)

    Not Available

    1994-07-15

    This meeting of the Environmental Management Advisory Board was held to discuss environmental concerns that everybody has and to provide a strategy for dealing with the problems. Plans for the Environmental Management Programmatic Environmental Impact Statement are presented. A report is included of the subcommittee on institutional barriers to advanced technology use. The subcommittee on environmental restoration cost effectiveness also presents a report. The status of public involvement activities is evaluated. A presentation on the status of spent fuel management is included.

  20. U.S. Department of Energy Environmental Management Site-Specific

    Office of Environmental Management (EM)

    ... Environmental Management Site- Specific Advisory Board (2012). http:energy.govsitesprodfilesemEMSSABCharter-FINAL.pdf Delegations: Department of Energy Delegation Order ...

  1. U.S. DEPARTMENT OF ENERGY Central Nevada Test Area ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Central Nevada Test Area Environmental Management End State Vision - January 2005 DOE/NV--954 U.S. DEPARTMENT OF ENERGY Central Nevada Test Area ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Central Nevada Test Area Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE],

  2. U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Project Shoal Site Environmental Management End State Vision - January 2005 DOE/NV--955 U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Project Shoal Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public

  3. U.S. DEPARTMENT OF ENERGY Rulison Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Rulison Site Environmental Management End State Vision - January 2005 DOE/NV--950 U.S. DEPARTMENT OF ENERGY Rulison Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Rulison Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public stakeholders, Tribal

  4. Evolution and History of the Department of Energy and the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    An overview of the Evolution and History of the Department of Energy and the Office of Environmental Management.

  5. Summary Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement

    Office of Environmental Management (EM)

    Environmental Impact Statement Final LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY Final Supplemental Environmental Impact Statement LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY DOE/EIS-0423-S1 September 2013 SUMMARY AND GUIDE FOR STAKEHOLDERS U.S. Department of Energy Office of Environmental Management Washington, DC AVAILABILITY OF THIS FINAL LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT For additional information on this

  6. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  7. DOE methods for evaluating environmental and waste management samples

    SciTech Connect (OSTI)

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1994-10-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Analytical Services Division of DOE. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types, {open_quotes}Draft{close_quotes} or {open_quotes}Verified{close_quotes}. {open_quotes}Draft{close_quotes} methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. {open_quotes}Verified{close_quotes} methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations. These methods have delineated measures of precision and accuracy.

  8. ORNL long-range environmental and waste management plan

    SciTech Connect (OSTI)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  9. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  10. DOE OFFICE OF ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW "I am proud of all of the work we in EM-both at headquarters and in the field-have accomplished this year. While facing the most complex cleanup challenges, measurable progress was made in 2015-a testament to our skilled workforce. The considerable investment made in cleanup this year has led to strong results across the EM complex. The foundation and planning put in place this year will enable EM to hit the ground running in 2016. I was honored

  11. Lantana landfill: A history of environmental management 1965--96

    SciTech Connect (OSTI)

    Statom, R.A.

    1997-08-01

    The Lantana Sanitary Landfill (LSL) is located in central Palm Beach County, Florida. The history of this landfill is a case study of the changes in environmental law, demography, solid waste management, hydrogeology, and public opinion in south Florida in the last 30 years. In 1983 Palm Beach County transferred ownership of the LSL to the Palm Beach County Solid Waste Authority (SWA). Environmental regulation enacted by Florida in the mid 1980`s resulted in negotiations to close the LSL. Closure was completed in 1988 utilizing a synthetic top liner, a landfill gas extraction/flare system, and a stormwater management system. In 1990 a groundwater mitigation system was installed to remediate the eastern plume. Closure of the LSL, extension of municipal water to local residents, and extensive public education by the SWA all served to answer most of the complaints of the local residents. In 1996 the LSL fell under a new series of air regulations and was required to apply for a Title V permit.

  12. Environmental Management Headquarters Corrective Action Plan- Radiological Release Phase I

    Broader source: Energy.gov [DOE]

    The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31 Conclusions and 47 Judgments of Need (JON). Twelve of the Conclusions and ten of the JONs were determined to be associated with DOE HQ oversight of the operations. As such, EM HQ has taken the action to develop the CAP for those JONs specific to HQ (i.e., JONs 11, 13, 23, 25, 26, 32, 44-47). This report documents those corrective actions, along with the responsible office and due dates for completing the actions. The overall approval process for the CAPs associated with this event will involve both the Carlsbad Field Office (CBFO) and EM HQ offices. Specifically, CBFO will approve the NWP CAP (with EM HQ concurrence); EM HQ Office of Safety, Security, and Quality Programs (EM-40) will approve the CBFO CAP; and the Assistant Secretary for the Office of Environmental Management (EM-1) will approve the EM HQ CAP.

  13. Tank Farm Closure & Waste Management Environmental Impact Statement <br>

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DOE/EIS-0391) - Hanford Site Statements Tank Closure & WM EIS Info Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA - Environmental Impact Statements Environmental Management Performance Reports Tank Farm Closure & Waste Management Environmental Impact Statement (DOE/EIS-0391) Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The U.S. Department of Energy (USDOE) has prepared a Final Environmental

  14. Environmental management compliance reengineering project, FY 1997 report

    SciTech Connect (OSTI)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  15. An environmentally sustainable decision model for urban solid waste management

    SciTech Connect (OSTI)

    Costi, P.; Minciardi, R.; Robba, M.; Rovatti, M.; Sacile, R

    2004-07-01

    The aim of this work is to present the structure and the application of a decision support system (DSS) designed to help decision makers of a municipality in the development of incineration, disposal, treatment and recycling integrated programs. Specifically, within a MSW management system, several treatment plants and facilities can generally be found: separators, plants for production of refuse derived fuel (RDF), incinerators with energy recovery, plants for treatment of organic material, and sanitary landfills. The main goal of the DSS is to plan the MSW management, defining the refuse flows that have to be sent to recycling or to different treatment or disposal plants, and suggesting the optimal number, the kinds, and the localization of the plants that have to be active. The DSS is based on a decision model that requires the solution of a constrained non-linear optimization problem, where some decision variables are binary and other ones are continuous. The objective function takes into account all possible economic costs, whereas constraints arise from technical, normative, and environmental issues. Specifically, pollution and impacts, induced by the overall solid waste management system, are considered through the formalization of constraints on incineration emissions and on negative effects produced by disposal or other particular treatments.

  16. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  17. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    SciTech Connect (OSTI)

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy`s (DOE`s) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples.

  18. The role of metadata in managing large environmental science datasets. Proceedings

    SciTech Connect (OSTI)

    Melton, R.B.; DeVaney, D.M.; French, J. C.

    1995-06-01

    The purpose of this workshop was to bring together computer science researchers and environmental sciences data management practitioners to consider the role of metadata in managing large environmental sciences datasets. The objectives included: establishing a common definition of metadata; identifying categories of metadata; defining problems in managing metadata; and defining problems related to linking metadata with primary data.

  19. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    SciTech Connect (OSTI)

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  20. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect (OSTI)

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  1. Visual Data Analysis as an Integral Part of Environmental Management

    SciTech Connect (OSTI)

    Meyer, Joerg; Bethel, E. Wes; Horsman, Jennifer L.; Hubbard, Susan S.; Krishnan, Hari; Romosan, Alex; Keating, Elizabeth; Monroe, Laura M.; Strelitz, Richard; Moore, Philip; Taylor, Glenn; Torkian, Ben; Johnson, Timothy C.; Gorton, Ian

    2012-12-01

    The U.S. Department of Energy's (DOE) Office of Environmental Management (DOE/EM) currently supports an effort to understand and predict contaminant fate and transport in natural and engineered systems. Geologists, hydrologists, physicists and computer scientists are working together to create models of existing contaminated sites and to simulate their behavior. Simulation results are verified based on historical data and extrapolated into the future. Visualization is used for model setup verification, visual analysis of high-performance computing simulation results, and uncertainty quantification. This article describes the challenges and solutions for visual data analysis, which impacts the decision-making process for each of the contaminated sites. Lessons learned from these simulations will also have an impact on deciding on treatment measures for other, similarly contaminated areas, including those affected by more recent events, such as Chernobyl and Fukushima.

  2. Using FRAMES to Manage Environmental and Water Resources

    SciTech Connect (OSTI)

    Whelan, Gene; Millard, W. David; Gelston, Gariann M.; Khangaonkar, Tarang P.; Pelton, Mitch A.; Strenge, Dennis L.; Yang, Zhaoqing; Lee, Cheegwan; Sivaraman, Chitra; Stephan, Alex J.; Hoopes, Bonnie L.; Castleton, Karl J.

    2007-05-16

    The Framework for Risk Analysis in Multimedia Environmental Systems FRAMES) is decision-support middleware that provides users the ability to design software solutions for complex problems. It is a software platform that provides seamless and transparent communication between modeling components by using a multi-thematic approach to provide a flexible and holistic understanding of how environmental factors potentially affect humans and the environment. It incorporates disparate components (e.g., models, databases, and other frameworks) that integrate across scientific disciplines, allowing for tailored solutions to specific activities. This paper discusses one example application of FRAMES, where several commercialoff-the-shelf (COTS) software products are seamlessly linked into a planning and decision-support tool that helps manage water-based emergency situations and sustainable response. Multiple COTS models, including three surface water models, and a number of databases are linked through FRAMES to assess the impact of three asymmetric and simultaneous events, two of which impact water resources. The asymmetric events include 1) an unconventional radioactive release into a large potable water body, 2) a conventional contaminant (oil) release into navigable waters, and 3) an instantaneous atmospheric radioactive release.

  3. 2016 Annual Workforce Analysis and Staffing Plan Report - DOE Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (4193) United States Government Department of Energy Oak Ridge Office of Environmental Management memorandum DATE: January 19, 2016 REPLY TO ATTN OF: EM-90:Cange SUBJECT: 2015 OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT ANNUAL WORKFORCE ANALYSIS AND STAFFING PLAN TO: Karen L. Boardman, Chairperson, Federal Technical Capability Panel, HS-70 The Oak Ridge Office of Environmental Management (OREM) has produced the required OREM Annual Workforce Analysis and Staffing Plan. The attached report

  4. U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD DOE-EM Technology Development and Deployment Program Submitted by the EMAB Science & Technology Subcommittee Introduction: This report provides a summary of the work of the Science and Technology Subcommittee of the Environmental Management Advisory Board (EMAB), since its inception in December 2012. In Fiscal Year 2013, the Acting Assistant Secretary, David Huizenga, U.S. Department (DOE) Office of the Environmental Management (EM)

  5. U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD DOE-EM Technology Development and Deployment Program Submitted by the EMAB Science & Technology Subcommittee Introduction: This report provides a summary of the work of the Science and Technology Subcommittee of the Environmental Management Advisory Board (EMAB), since its inception in December 2012. In Fiscal Year 2013, the Acting Assistant Secretary, David Huizenga, U.S. Department (DOE) Office of the Environmental Management (EM)

  6. Report of the Task Force on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    SEAB findings and recommendations on the value of a renewed environmental management science and technology development effort and how such a program would be structured.

  7. PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT

    Broader source: Energy.gov [DOE]

    A briefing to the SEAB Task Force on Technology Development for Environmental Management (EM) on a proposed "DARPA-Inspired" approach to technology development for EM.

  8. Dr. Monica Regalbuto Confirmed as DOE Assistant Secretary for Environmental Management

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Dr. Monica Regalbuto was confirmed by the Senate Wednesday as the Department of Energy’s Assistant Secretary for Environmental Management.

  9. July 15, 2014 SEAB Task Force Meeting on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    The SEAB Task Force on Technology Development for Environmental Management met at U.S. Department of Energy in Washington, DC.

  10. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  11. DOE Awards Task Order Modification for Support Services to Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and program analytical support for the Office of Environmental Management.

  12. Visual Data Analysis as an Integral Part of Environmental Management

    SciTech Connect (OSTI)

    Meyer, Joerg; Bethel, E. Wes; Horsman, Jennifer L.; Hubbard, Susan S.; Krishnan, Harinarayan; Romosan,, Alexandru; Keating, Elizabeth H.; Monroe, Laura; Strelitz, Richard; Moore, Phil; Taylor, Glenn; Torkian, Ben; Johnson, Timothy C.; Gorton, Ian

    2012-10-01

    The U.S. Department of Energy's (DOE) Office of Environmental Management (DOE/EM) currently supports an effort to understand and predict the fate of nuclear contaminants and their transport in natural and engineered systems. Geologists, hydrologists, physicists and computer scientists are working together to create models of existing nuclear waste sites, to simulate their behavior and to extrapolate it into the future. We use visualization as an integral part in each step of this process. In the first step, visualization is used to verify model setup and to estimate critical parameters. High-performance computing simulations of contaminant transport produces massive amounts of data, which is then analyzed using visualization software specifically designed for parallel processing of large amounts of structured and unstructured data. Finally, simulation results are validated by comparing simulation results to measured current and historical field data. We describe in this article how visual analysis is used as an integral part of the decision-making process in the planning of ongoing and future treatment options for the contaminated nuclear waste sites. Lessons learned from visually analyzing our large-scale simulation runs will also have an impact on deciding on treatment measures for other contaminated sites.

  13. U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Environmental Management (EM)

    ... overall project management performance results Lessons learned - NASA James Webb Space Telescope (NASA) Project Management Institute view on the pulse of the industry and ...

  14. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD U.S. DEPARTMENT OF ENERGY

    Office of Environmental Management (EM)

    ... overall project management performance results Lessons learned - NASA James Webb Space Telescope (NASA) Project Management Institute view on the pulse of the industry and ...

  15. Environmental Management Advisory Board U.S. Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Advisory Board U.S. Department of Energy Advisory Board Charter 1. Committee's ... program including, but not limited to, project management and oversight, costbenefit ...

  16. Advanced Simulation Capability for Environmental Management (ASCEM) Phase II Demonstration

    SciTech Connect (OSTI)

    Freshley, M.; Hubbard, S.; Flach, G.; Freedman, V.; Agarwal, D.; Andre, B.; Bott, Y.; Chen, X.; Davis, J.; Faybishenko, B.; Gorton, I.; Murray, C.; Moulton, D.; Meyer, J.; Rockhold, M.; Shoshani, A.; Steefel, C.; Wainwright, H.; Waichler, S.

    2012-09-28

    In 2009, the National Academies of Science (NAS) reviewed and validated the U.S. Department of Energy Office of Environmental Management (EM) Technology Program in its publication, Advice on the Department of Energy’s Cleanup Technology Roadmap: Gaps and Bridges. The NAS report outlined prioritization needs for the Groundwater and Soil Remediation Roadmap, concluded that contaminant behavior in the subsurface is poorly understood, and recommended further research in this area as a high priority. To address this NAS concern, the EM Office of Site Restoration began supporting the development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific approach that uses an integration of toolsets for understanding and predicting contaminant fate and transport in natural and engineered systems. The ASCEM modeling toolset is modular and open source. It is divided into three thrust areas: Multi-Process High Performance Computing (HPC), Platform and Integrated Toolsets, and Site Applications. The ASCEM toolsets will facilitate integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. During fiscal year 2012, the ASCEM project continued to make significant progress in capabilities development. Capability development occurred in both the Platform and Integrated Toolsets and Multi-Process HPC Simulator areas. The new Platform and Integrated Toolsets capabilities provide the user an interface and the tools necessary for end-to-end model development that includes conceptual model definition, data management for model input, model calibration and uncertainty analysis, and model output processing including visualization. The new HPC Simulator capabilities target increased functionality of process model representations, toolsets for interaction with the Platform, and model confidence testing and verification for

  17. Waste Acceptance Decisions and Uncertainty Analysis at the Oak Ridge Environmental Management Waste Management Facility

    SciTech Connect (OSTI)

    Redus, K. S.; Patterson, J. E.; Hampshire, G. L.; Perkins, A. B.

    2003-02-25

    The Waste Acceptance Criteria (WAC) Attainment Team (AT) routinely provides the U.S. Department of Energy (DOE) Oak Ridge Operations with Go/No-Go decisions associated with the disposition of over 1.8 million yd3 of low-level radioactive, TSCA, and RCRA hazardous waste. This supply of waste comes from 60+ environmental restoration projects over the next 15 years planned to be dispositioned at the Oak Ridge Environmental Management Waste Management Facility (EMWMF). The EMWMF WAC AT decision making process is accomplished in four ways: (1) ensure a clearly defined mission and timeframe for accomplishment is established, (2) provide an effective organization structure with trained personnel, (3) have in place a set of waste acceptance decisions and Data Quality Objectives (DQO) for which quantitative measures are required, and (4) use validated risk-based forecasting, decision support, and modeling/simulation tools. We provide a summary of WAC AT structure and performance. We offer suggestions based on lessons learned for effective transfer to other DOE.

  18. Testimony of Mark Whitney Principal Deputy Assistant Secretary for Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    United States Department of Energy Before the House Committee on Energy and Commerce Subcommittee on Environment and Economy September 11, 2015 Good morning Chairman Shimkus, Ranking Member Tonko, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM) to discuss the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Overview of the Environmental Management Mission The

  19. DOE - Office of Legacy Management -- Center for Energy and Environmental

    Office of Legacy Management (LM)

    Research - PR 02 Center for Energy and Environmental Research - PR 02 FUSRAP Considered Sites Site: Center for Energy and Environmental Research (PR.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Documents Related to Center for Energy and Environmental Research

  20. Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards

    Broader source: Energy.gov [DOE]

    Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific...

  1. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection

    Office of Environmental Management (EM)

    JUN 1 1 2013 Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection Division of Waste Management 200 Fair Oaks Lane, 2 nd Floor Frankfort, Kentucky 40601 Ms. Jennifer Tufts Federal Facility Agreement Manager U.S. Environmental Protection Agency, Region 4 61 Forsyth Street Atlanta, Georgia 30303 Dear Mr. Mullins and Ms. Tufts: PPPO-02-1813000-13B TRANSMITTAL OF THE COMMUNITY RELATIONS PLAN UNDER THE FEDERAL FACILITY AGREEMENT AT THE U.S. DEPARTMENT OF

  2. Senior Managers' Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-10-25

    This Guide provides a summary description of environmental management systems (EMSs) for DOE senior managers, including their responsibilities as they apply to the successful implementation of an Integrated Safety Management Systems/EMS and the expected benefits to be derived from such implementation. Canceled by DOE N 251.82.

  3. EIS-0200: Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste

    Broader source: Energy.gov [DOE]

    This Programmatic EIS evaluates the potential environmental and cost impacts of strategic management alternatives for managing five types of radioactive and hazardous wastes that have resulted and will continue to result from nuclear defense and research activities at a variety of sites around the United States.

  4. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS...

    Office of Environmental Management (EM)

    Dave Borak, EM SSAB Designated Federal Officer Matt McCormick, DOE-RL Manager Kevin Smith, DOE-ORP Manager Jane Hedges, Washington State Department of Ecology Dennis Faulk, U.S. ...

  5. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . 3. 3. Certified Certified by: by: Wzk"J Wz Signature Signature Robert Robert L. L. Erikson Erikson Name Name Principal Principal Title Title Columbia Columbia Environmental...

  6. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Education: B.S., Environmental Science; Minor: Geology, Eastern Washington University B.S., Biology; Minor: Urban and Regional Planning, Eastern Washington University ...

  7. Brazil-US EPA Environmental Management Activities | Open Energy...

    Open Energy Info (EERE)

    navigation, search Name Brazil-US EPA Program AgencyCompany Organization United States Environmental Protection Agency Sector Energy, Land Topics Background analysis Website...

  8. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the potential long-term environmental and human health impacts associated with ... 3 above de minimis values. 5.2.2 Human Health Impacts Potential human health ...

  9. Ashtabula, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    disposal facility. Cleanup was completed in September 2006. The Oak Ridge Institute of Science and Education in Oak Ridge, Tennessee, performed an independent verification survey...

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  11. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The

  12. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  13. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    justice, waste management, and spent nuclear fuel. 3.1 APPROACH TO DEFINING THE AFFECTED ... machinery, photographs and graphs, publications, control room panels, and models. ...

  14. DOE Environmental Management Strategy and Experience for In-Situ...

    Office of Environmental Management (EM)

    ... for the Management and Disposal of Spent Nuclear Fuel, High Level and TRU Wastes Regulation ... Makeup area (PM area) is constructed of structural steel with transite panels. ...

  15. Proposed Resource Management Plan/Final Environmental Impact...

    National Nuclear Security Administration (NNSA)

    ... owl (BLM sensitive species) * Sunnyside green gentian (BLM sensitive species) To manage ... Monitoring wind energy development projects; and * Rehabilitating areas damaged by fires. ...

  16. Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management

    Broader source: Energy.gov [DOE]

    It is the policy of the United States that Federal agencies conduct their environmental, transportation, and energy-related activities under the law in support of their respective missions in an...

  17. EO 13423: Strengthening Federal Environmental, Energy, and Transportation Management (2007)

    Broader source: Energy.gov [DOE]

    It is the policy of the United States that Federal agencies conduct their environmental, transportation, and energy-related activities under the law in support of their respective missions in an...

  18. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... NEPA National Environmental Policy Act NFPA National Fire Protection Association NI ... that are less than 0.001 or greater than 9,999 are generally expressed in scientific ...

  19. EO 13148: Greening the Government Through Leadership in Environmental Management

    Broader source: Energy.gov [DOE]

    The head of each Federal agency is responsible for ensuring that all necessary actions are taken to integrate environmental accountability into agency day-to-day decisionmaking and long-term...

  20. DOE Office of Environmental Management 2015 Year in Review |...

    Energy Savers [EERE]

    ... The site's coal-fired steam plant was replaced with five new natural gas package boilers to save energy costs and provide environmental benefits. EM and its contractor, Fluor ...

  1. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  2. United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

  3. Energy Department Issues Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement

  4. United States of America Department of Energy Environmental Management Advisory Committee Public Meeting

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This reports contains documentation of presentations given at the United States of America Department of Energy Environmental Management Advisory Committee Public Meeting held December 14--15, 1993 in Alexandria, Virginia.

  5. Bureau of Land Management - 4.0 Chapter 4 - Environmental Effects...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Bureau of Land Management - 4.0 Chapter 4 - Environmental EffectsLegal Abstract This chapter discloses the...

  6. DOE Awards Small Business Contract for Support, Planning Services to Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a $1.5 million contact (task order) to Trinity Engineering Associates, Inc. of Cincinnati, Ohio for planning and support functions for the Office of Environmental Management.

  7. Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract

    Broader source: Energy.gov [DOE]

    This week, Celeritex, LLC landed a contract worth up to $17.8 million with the Office of Environmental Management, having demonstrated through a competetive process that this small business is up...

  8. DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to Boston Government Services, LLC of Lenoir City, Tennessee for support services to the DOE Office of Environmental Management.

  9. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  10. The Secretary of Energy Advisory Board (SEAB) Task Force on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    While the Department's Office of Environmental Management (EM) has made significant progress in closing a number of projects, many of the most challenging projects remain and will for decades to...

  11. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  12. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    SciTech Connect (OSTI)

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  13. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Broader source: Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  14. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and Environmental Management Science Program research award abstracts. Volume 2 of 3 -- Appendix B

    SciTech Connect (OSTI)

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix B provides details about each of the 202 research awards funded by the EMSP. This information may prove useful to researchers who are attempting to address the Department`s environmental management challenges in their work, program managers who are planning, integrating, and prioritizing Environmental Management projects, and stakeholders and regulators who are interested in the Department`s environmental challenges. The research award information is organized by the state and institution in which the lead principal investigator is located. In many cases, the lead principal investigator is one of several investigators at a number of different institutions. In these cases, the lead investigator (major collaborator) at each of the additional institutions is listed. Each research award abstract is followed by a list of high cost projects that can potentially be impacted by the research results. High cost projects are Environmental Management projects that have total costs greater than $50 million from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and have costs or quantities of material associated with an Environmental Management problem area. High cost projects which must remain active in the year 2007 and beyond to manage high risk are also identified. Descriptions of these potentially related high cost Environmental Management projects can be found in Appendix C. Additional projects in the same problem area as a research award can be located using the Index of High Cost Environmental Management Projects by Problem Area, at the end of Appendices B and C.

  15. Assignment of Responsibilities for Executive Order 131 48, Greening the Government Through Leadership In Environmental Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-04-21

    Executive Order 13148, Greening the Government Through Leadership in Environmental Management, was signed by the President on April 21, 2000. This Order establishes new goals and requirements for Federal agencies that complement many Department of Energy (DOE) initiatives under way. These new goals and requirements affirm DOE's approach to improving environmental performance through the use of management systems and aggressive pollution prevention initiatives. Does not cancel other directives.

  16. NATIONAL ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off

    Office of Legacy Management (LM)

    ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off April 24,2001 ACTION: DRAFT ENVIRONMENT ASSESSMENT OF GROUND WATER COMPLIANCE ACTIVITIES AT THE URANIUM MILL TAILINGS SITE, SHIPROCK, NEW MEXICO ISSUE: DraR Environmental Assessment of Ground Water Compliance at the Uranium Mill Tailings Site, Shiprock, New Mexico, to the Navajo Nation, federal and tribal regulatoly agencies, and other interested stakeholders for review and comment. RECOMMENDATION: The Management Review Team

  17. Oak Ridge Office of Environmental Management Pursues Vision of Future While

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remembering Past | Department of Energy Office of Environmental Management Pursues Vision of Future While Remembering Past Oak Ridge Office of Environmental Management Pursues Vision of Future While Remembering Past December 27, 2012 - 12:00pm Addthis Demolition of K-25, DOE’s largest-ever demolition project, is ongoing. Demolition of K-25, DOE's largest-ever demolition project, is ongoing. This graphic shows the status of activities at the East Tennessee Technology Park as of this

  18. Written Statement of Mark Whitney Acting Assistant Secretary for Environmental Management United States Department of

    Office of Environmental Management (EM)

    Mark Whitney Acting Assistant Secretary for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces Committee on Armed Services United States House of Representatives March 24, 2015 Good morning Chairman Rogers, Ranking Member Cooper, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide you with an overview of the EM program, key

  19. I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ' I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation ' Pilot Plant February SJ 2014 Washington, DC 20585 August 2014 Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 Prepared : James Hutton Acting Deputy Assistant Secretary for Safety,

  20. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect (OSTI)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  1. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  2. Risk management considerations for cost-effective environmental decisionmaking

    SciTech Connect (OSTI)

    Gonzalez, M.A.

    1995-09-14

    Scientific publications and media reports continually remind us about the environmental hazards that surround us. We are appraised of the environmental legacies left by chemical industries, the defense complex, and even our local dry cleaning establishments. Governmental regulations have dictated that industry provide detailed listings of their input materials, wastes, and emissions to the public and perform risk assessments to demonstrate compliance with standards. These regulations were designed to make industry more accountable and to give the public information that would allow them to understand risks and either work for change or accept their living conditions. This process would appear to be rational, fair, and acceptable to both industry and the public. However, our inability to reach agreement on questions such as ``How Clean is Clean?`` or ``Is It Safe?`` after more than ten years of scientific and public discussions, coupled with the frequency of environmental demonstrations throughout the world, serves as evidence that ``acceptable risk`` has not yet been defined.

  3. Tank Closure and Waste Management Environmental Impact Statement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Section 4 References 4-7 10 CFR 830, U.S. Department of Energy, "Nuclear Safety Management." 10 CFR 835, U.S. Department of Energy, "Occupational Radiation Protection." 10 CFR ...

  4. Office of Environmental Management: A Journey to Excellence

    Office of Environmental Management (EM)

    Goal 6: Improve contract and project management with the objective of delivering results ... LLWMLLW Disposal Forecast Trends (millions of cubic feet) 0 5 10 15 20 25 30 35 40 45 50 ...

  5. Final Tank Closure and Waste Management Environmental Impact...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Mary Beth Burandt, Document Manager U.S. Department of Energy, Office of River Protection P.O. Box 450, Mail Stop H6-60 Richland, WA 99352 TC&WMEIS@saic.com Fax: 1-888-785-2865 - ...

  6. Environmental Management Site-Specific Advisory Board Chairs...

    Office of Environmental Management (EM)

    and Project Management 12:00 pm Lunch 1:30 pm Site Restoration Update Tania Smith, Acting Associate Deputy Assistant Secretary for Site Restoration 3:00 pm Break 3:15 pm ...

  7. FY 2013 Budget Request Office of Environmental Management

    Office of Environmental Management (EM)

    STATEMENT OF DAVID GEISER DIRECTOR, OFFICE OF LEGACY MANAGEMENT DEPARTMENT OF ENERGY BEFORE THE SUBCOMMITTEE ON ENERGY AND WATER DEVELOPMENT COMMITTEE ON APPROPRIATIONS UNITED STATES HOUSE OF REPRESENTATIVES MARCH 16, 2010 Good morning Mr. Chairman, Ranking Member Frelinghuysen, and distinguished members of the Committee. My name is Dave Geiser and I am the Director of the Office of Legacy Management (LM) at the Department of Energy (DOE). LM is responsible for ensuring that DOE's post-closure

  8. Ontario Hydro -- Recent advances in fossil environmental management and control

    SciTech Connect (OSTI)

    Seckington, B.R.

    1997-12-31

    This paper provides a brief overview of various recent environmental activities within the Fossil Business Unit of Ontario Hydro, specifically those related to air emissions and acid rain. This includes: (1) an overview of involvement with current and anticipated Federal and Ontario Provincial regulatory positions and directions; (2) a brief synopsis of environmental installations of FGD at Lambton GS and Low NO{sub x} burners at Lambton and Nanticoke; (3) development of market mechanisms; and (4) R and D activities related to impact assessment and control technology.

  9. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  11. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Summary

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  12. Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Amchitka Ashtabula Fernald Environmental Management Project Maybell Miamisburg Environmental Management Project Rocky Flats Environmental Technology Site Shiprock Slick Rock South Valley Spook Tuba City Weldon Spring Miscellaneous

  13. BUILDING TRIBAL CAPABILITIES IN ENERGY AND ENVIRONMENTAL MANAGEMENT

    SciTech Connect (OSTI)

    Unknown

    2000-03-01

    The following activities were completed by the end of the quarter: (1) The CERT Executive Director invited a cross section of CERT member Tribes to participate in the project. By the end of the quarter, three Tribes had the invitation under active consideration, four Tribes expressed interest but wanted to see the detailed workplan prior to making a final decision and one Tribe, the Navajo Nation has accepted the invitation. (2) The CERT Board of Directors Executive Committee has endorsed two significant environmental policy priorities for consideration in the project. First, how does the federal Indian trust responsibility to land and natural resources as well as for the health, safety and political integrity of Indian Tribes affect the federal responsibility for facility cleanup and other statutory mandates under federal environmental statutes? And second, What are the protocols of government-to-government relations within a federal system of shared sovereignty and shared governmental responsibilities? And the corollaries to that question, What is the federal obligation for consultation with Tribes and how is that different and similar to consultation with states? And, What is the federal obligation to work cooperatively with Tribes and states in recognition of the three sovereigns of the American federal system? (3) The CERT consulted with political leaders and environmental staff of member and non-member Tribes. This consultation centered on three environmental policy priorities: issues concerning the intergovernmental interface between states, Tribes and federal government agencies and programs; Issues with the cleanup of federal facilities and activities that have damaged Tribal environmental resources; and issues concerning the DOE cleanup of federal facilities used in the production of nuclear weapons.

  14. Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the

  15. Environmental Management System (EMS) objectives&targets annual results summary : FY2012.

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2013-02-01

    Sandia National Laboratories/New Mexico's (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NM's operations on the environment. An annual summary of the results achieved towards meeting established objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2012.

  16. Environmental Management Los Alamos Field Corrective Action Plan- Radiological Release Phase II

    Broader source: Energy.gov [DOE]

    On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at LANL. The NA-LA continues with the responsibility for the management of LANL's national security mission and the enduring waste management program (newly generated waste). As a result of this delineation in responsibilities, this corrective action plan was prepared collaboratively between NA-LA and EM-LA Field Offices, with joint responsibility for addressing the Judgement of Needs (JONs) identified in the Accident Investigation Board Accident Investigation Report, Phase 2 Radiological Release Event at the Waste Isolation Pilot Plant, February 14, 2014, dated April 2015.

  17. Fernald Environmental Management Project Archived Soil & Groundwater Master

    Office of Environmental Management (EM)

    Federal Register Notice, CBDPP Final Rule Federal Register Notice, CBDPP Final Rule December 8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic beryllium disease prevention program (CBDPP) to reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, minimize the levels of, and potential for, exposure to beryllium, and

  18. Decision management for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Roberds, W.J.; Haerer, H.A.; Winterfeldt, D.V.

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability.

  19. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    SciTech Connect (OSTI)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

  20. Department of Energy - Environmental Management FY 2009 Congressional Budget Request

    Energy Savers [EERE]

    Electronic Commerce EC-Web Project Plan May 1997 U. S. DEPARTMENT OF ENERGY Assistant Secretary for Human Resources and Administration Office of Procurement Operations Office of Information Management i May 1997 Title Page Document Name: EC-Web Project Plan Publication Date: May 1997 Contract Number: DE-AC01-95AD34277 Project Number: 5004 Prepared by: Jill Schwartz Kevin Shaver Approval: Andy Yocke, HR-43.1 U.S. DEPARTMENT OF ENERGY Assistant Secretary for Human Resources and Administration

  1. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  2. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volume 3, Book 1 Section 1: Overview Section 2: Topics of Interest Section 3: Individual Commentors U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County,

  3. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    SciTech Connect (OSTI)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  4. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  5. 2012-01 "Fiscal Year 2014 Budget Request for LANL Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work" | Department of Energy 1 "Fiscal Year 2014 Budget Request for LANL Environmental Management Work" 2012-01 "Fiscal Year 2014 Budget Request for LANL Environmental Management Work" It is the intent of the NNMCAB to support FY 2014 funding for LANL at the full baseline level and to support additional funding from Headquarters/DOE through fiscal year 2015, in order to complete scope on the Consent Order schedule requirements, and to meet DOE/EM goals. It is also

  6. Lesson Learned by Environmental Management Complex-wide Activity-level Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Control | Department of Energy Environmental Management Complex-wide Activity-level Work Planning and Control Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control May 31, 2013 Presenter: Roger M. Claycomb, DOE Idaho Operations Office Topics Covered: EM Headquarters WP&C Oversight EM HQ Participation on Field Office Reviews URS WP&C Standard and EFCOG WP&C Guideline EM HQ Evaluation of Field Office Annual ISMS Declarations

  7. Integrating technical knowledge and management skill in the education of environmental professionals

    SciTech Connect (OSTI)

    Campbell, K.S.; Aldrich, J.R.

    1995-12-01

    The educational preparation of environmental professionals has been criticized as too narrow. Most degree programs emphasize a specific technical area (e.g., toxicology or air quality) or specific management area (e.g., economics or public policy). The consequences of such focused educational backgrounds can severely limit the effectiveness and efficiency of most environmental professionals: those who work for corporations whose primary mission is not related to the environment but who must consider the environment in the course of carrying out their mission. The authors suspect that lack of communication between practicing professionals in private and public organizations and academics is one root cause of the limitations of current academic programs that prepare environmental professionals. In order to demonstrate the potential advantages of such communication as well as the possibility of integrating technical and management education in a single program, this paper describes the Graduate Environmental and Engineering Management (GEE) curriculum within the School of Engineering at the Air Force Institute of Technology (AFIT). It is the hope of the authors that this model curriculum will prompt practicing environmental professionals and others outside academy to involve themselves in the development of educational programs designed to prepare future environmental professionals.

  8. The Department of Energy's Office of Environmental Management's Budget Allocation Plan, OAS-L-12-03

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Department of Energy's Office of Environmental Management's Budget Allocation Plan OAS-L-12-03 March 2012 Department of Energy Washington, DC 20585 March 15, 2012 MEMORANDUM FOR THE SENIOR ADVISOR FOR ENVIRONMENTAL MANAGEMENT FROM: Daniel M. Weeber, Director Eastern Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Office of Environmental Management's Budget Allocation Plan" BACKGROUND The Department of Energy's Office of

  9. US - Former Soviet Union environmental restoration and waste management activities, March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Peaceful Uses of Atomic Energy Agreement was signed between DOE and the Ministry of Atomic Energy for the Russian Federation and provides a mechanism for cooperation in research, development, and safe utilization of nuclear energy. Under the umbrella of this agreement, DOE and the former Ministry of Atomic Power and Industry signed a Memorandum of Cooperation in the areas of environmental restoration and waste management in September 1990. This document discusses the environmental situation, science and technology process, technical projects (separations, contaminant transport, waste treatment, environmental restoration), scientist exchanges, enhanced data transfer, the US-Russia industry partnership (conference, centers), and future actions.

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E-1 APPENDIX E DESCRIPTIONS OF FACILITIES, OPERATIONS, AND TECHNOLOGIES Appendix E provides additional information about the technologies, processes, and facilities for the three key activities of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington: tank closure, Fast Flux Test Facility decommissioning, and waste management. Section E.1 includes this information for tank closure; Section E.2, for Fast Flux Test Facility

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the Hanford Site, Richland, Washington 5-394 5.2 FFTF DECOMMISSIONING ALTERNATIVES This section describes the potential long-term environmental and human health impacts associated with implementation of alternatives considered to decommission FFTF and auxiliary facilities at Hanford; to manage waste from the decommissioning process, including waste designated as remote-handled special components (RH-SCs); and to manage the disposition of the Hanford inventory of radioactively contaminated

  12. FOIASI- Special Inquiry Review of Allegations Involving PotentialMisconduct by a Senior Office of Environmental Management Official

    Broader source: Energy.gov [DOE]

    In September 2009, the Office of Inspector General (OIG) received multiple allegations concerning improprieties by a senior official with the Office of Environmental Management. The allegations...

  13. Low-level waste management alternatives and analysis in DOE`s programmatic environmental impact statement

    SciTech Connect (OSTI)

    Gerstein, J.S.

    1993-03-01

    The Department of Energy is preparing a Programmatic Environmental Impact Statement (PEIS) for the Environmental Restoration and Waste Management Program. The PEIS has been divided into an Environmental Restoration section and a Waste Management section. Each section has a unique set of alternatives. This paper will focus on the waste management alternatives and analysis. The set of alternatives for waste management has been divided into waste categories. These categories are: high-level waste, transuranic waste, low-level waste, low-level mixed waste, greater-than-class C and low-level waste from commercial sources, hazardous waste, and spent nuclear fuel. This paper will discuss the alternatives and analytical approach that will be used to evaluate these alternatives for the low-level waste section. Although the same alternatives will be considered for all waste types, the analysis will be performed separately for each waste type. In the sections that follow, information will be provided on waste management configurations, the analysis of waste management alternatives, waste types and locations, facility and transportation activities, the facility and transportation impacts assessment, and the compilation of impacts.

  14. Improved Decision Making through the Integration of Program and Project Management with National Environmental Policy Act Compliance

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-06-12

    Recommendations from the DOE Field Management Council (FMC), NEPA Improvement Team, and the Council on Environmental Quality (CEQ) for improving NEPA compliance through the integration of Program ad Project Management

  15. TRANSFORMING THE SRS ENVIRONMENTAL BUSINESS: COMMUNICATION AND APPLIED PROJECT MANAGEMENT PRINCIPLES

    SciTech Connect (OSTI)

    Saldivar, E.

    2010-01-20

    A process for communicating information relating to core business functions that also encourages improving internal communications has been established at SRS. This process continues to grow and strengthen as the multiple Contractors, Regulators and DOE-SR relationships mature. A number of management communication tools have been initiated, retooled, rebooted or continued with enhancements to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. The types of information that are the focus of this improved process are feedback from the customer and from informational exchange forums (i.e., Challenge Opportunity and Resolution (COR), SRS Regulatory Integration Team (SRIT), Environmental Quality Management Division (EQMD), Senior Environmental Managers Council (SEMC), etc.). These forums, SRS environmental functions centralization, and the creation of a Regulatory Integration process allows for cross-functional decision making, problem solving and information sharing that involves the field organizations, Environmental Compliance Authorities (ECA), Subject Matter Experts (SME), DOE and the Regulators. Numerous examples of effective decision-making and problem solving will be shared. Lessons Learned involving inadequate communications and the resulting impacts on the environment, customer satisfaction, and relationships will also be discussed. Additionally, the focus on improved communications also includes maintaining awareness of business activities. The tools being utilized to facilitate the continuing improvement of internal communications include weekly staff meetings for all individuals within the organization, quarterly ECA and SME meeting, quarterly Regulatory Integration & Environmental Services (RI&ES) All-Hands meetings hosted by the Director, bi-weekly EQMD and EQMD Lite meetings with the customer, bi-annual SRIT meetings, and COR meetings on an as need basis. In addition, an existing Required Reading Program

  16. Redesignation Order No. 00-09.01 to the Assistant Secretary for Environmental Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-05-12

    Redesignation of the Assistant Secretary for Environmental Management of DOE as the authorized representative to perform as the "Authorized Representative," as that term is used in the Nuclear Regulatory Commission (NRC) regulations at 10 CFR 72.16(b) and as name holder of the NRC license under 10 CFR Part 72 of for the Idaho Spent Fuel Facility Independent Spent Fuel Storage Installation.

  17. EM Officials Join Environmental Management Advisory Board to Celebrate 20th Anniversary

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM Principal Deputy Assistant Secretary Tracy Mustin joined other officials last week to mark the 20th year of the independent, volunteer advisory board that offers the Assistant Secretary for the Office of Environmental Management guidance on critical issues involved in the world’s largest nuclear cleanup.

  18. Leaders of DOE Environmental Management Advisory Group to Meet in North Las Vegas

    Broader source: Energy.gov [DOE]

    Nevada Site Office News - The Chairs and Vice-Chairs of the U.S. Department of Energy’s (DOE) Environmental Management (EM) Site-Specific Advisory Board (SSAB) will meet in North Las Vegas, Nevada, June 15-16, at Aliante Station Hotel located at 7300 Aliante Parkway.

  19. Leaders of DOE Environmental Management Advisory Group to Meet in Henderson

    Broader source: Energy.gov [DOE]

    The Chairs and Vice-Chairs of the U.S. Department of Energy’s (DOE) Environmental Management (EM) Site-Specific Advisory Board (SSAB) will meet in Henderson, NV, April 13-14, at Green Valley Ranch located at 2300 Paseo Verde Parkway.

  20. U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan for Environmental Management Headquarters Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Washington, DC 20585 March 2015 Page 3 of 32 TABLE OF CONTENTS 1.0 PURPOSE ..................................................................................................................................................5 2.0 BACKGROUND

  1. Waste management programmatic environmental impact statement methodology for estimating human health risks

    SciTech Connect (OSTI)

    Bergenback, B.; Blaylock, B.P.; Legg, J.L.

    1995-05-01

    The US Department of Energy (DOE) has produced large quantities of radioactive and hazardous waste during years of nuclear weapons production. As a result, a large number of sites across the DOE Complex have become chemically and/or radiologically contaminated. In 1990, the Secretary of Energy charged the DOE Office of Environmental Restoration and Waste management (EM) with the task of preparing a Programmatic Environmental Impact Statement (PEIS). The PEIS should identify and assess the potential environmental impacts of implementing several integrated Environmental Restoration (ER) and Waste Management (WM) alternatives. The determination and integration of appropriate remediation activities and sound waste management practices is vital for ensuring the diminution of adverse human health impacts during site cleanup and waste management programs. This report documents the PEIS risk assessment methodology used to evaluate human health risks posed by WM activities. The methodology presents a programmatic cradle to grave risk assessment for EM program activities. A unit dose approach is used to estimate risks posed by WM activities and is the subject of this document.

  2. Automating the management of environmental compliance reporting: Making the complex simple

    SciTech Connect (OSTI)

    Perkins, S.

    2000-03-09

    Environmental compliance reporting requirements are notoriously complex. This reporting complexity is compounded by organizational and functional complexity at Rocky Mountain Arsenal (RMA), where the Department of the Army has undertaken a multi billion dollar environmental cleanup action. This site is subject to both fixed and contingent federal, state, and local reporting requirements. Management and operation of the site is characterized by numerous organizational layers, and compliance information is generated by many different contractors and subcontractors. This information must be compiled by various managers and reported to either regulators or Department of the Army offices. The RMA Environmental Compliance Office and top-level management must be assured that these reports are being promptly generated and submitted. With over 1,500 individual reporting requirements forecasted for over the next 11 years, the managerial challenge is immense. To facilitate the collation of data and issuance of compliance reports, an intranet-based database is being developed. This database is designed to be available to all personnel with access to the site's environmental compliance intranet. It presents all applicable reporting requirements in an easily sortable format. Information available for each report includes deadlines, report status, recipients, individuals responsible for report generation, and other relevant data fields. Reports can be generated that are pertinent to a specific project, office, individual, or timeframe. Because the database is an integral component of the RMA environmental compliance intranet site, reporting requirements can be linked to the regulatory or site-specific document that is driving the report. As a given report is issued, those responsible for its issuance update the database and certify that the report has been transmitted, thus enabling the RMA Environmental Compliance Office and site managers to keep real-time track of a report

  3. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  4. Potential use of feebate systems to foster environmentally sound urban waste management

    SciTech Connect (OSTI)

    Puig-Ventosa, Ignasi

    2004-07-01

    Waste treatment facilities are often shared among different municipalities as a means of managing wastes more efficiently. Usually, management costs are assigned to each municipality depending on the size of the population or total amount of waste produced, regardless of important environmental aspects such as per capita waste generation or achievements in composting or recycling. This paper presents a feebate (fee+rebate) system aimed to foster urban waste reduction and recovery. The proposal suggests that municipalities achieving better results in their waste management performance (from an ecological viewpoint) be recompensated with a rebate obtained from a fee charged to those municipalities that are less environmentally sound. This is a dynamic and flexible instrument that would positively encourage municipalities to reduce waste whilst increasing the recycling.

  5. Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Walker J.R.

    2010-03-01

    This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including

  6. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    SciTech Connect (OSTI)

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  7. Environmental assessment of garden waste management in the Municipality of Aarhus, Denmark

    SciTech Connect (OSTI)

    Boldrin, Alessio; Andersen, Jacob K.; Christensen, Thomas H.

    2011-07-15

    An environmental assessment of six scenarios for handling of garden waste in the Municipality of Aarhus (Denmark) was performed from a life cycle perspective by means of the LCA-model EASEWASTE. In the first (baseline) scenario, the current garden waste management system based on windrow composting was assessed, while in the other five scenarios alternative solutions including incineration and home composting of fractions of the garden waste were evaluated. The environmental profile (normalised to Person Equivalent, PE) of the current garden waste management in Aarhus is in the order of -6 to 8 mPE Mg{sup -1} ww for the non-toxic categories and up to 100 mPE Mg{sup -1} ww for the toxic categories. The potential impacts on non-toxic categories are much smaller than what is found for other fractions of municipal solid waste. Incineration (up to 35% of the garden waste) and home composting (up to 18% of the garden waste) seem from an environmental point of view suitable for diverting waste away from the composting facility in order to increase its capacity. In particular the incineration of woody parts of the garden waste improved the environmental profile of the garden waste management significantly.

  8. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6.

  9. Environmental impact assessment of solid waste management in Beijing City, China

    SciTech Connect (OSTI)

    Zhao Yan; Christensen, Thomas H.; Lu Wenjing; Wu Huayong; Wang Hongtao

    2011-04-15

    The environmental impacts of municipal solid waste management in Beijing City were evaluated using a life-cycle-based model, EASEWASTE, to take into account waste generation, collection, transportation, treatment/disposal technologies, and savings obtained by energy and material recovery. The current system, mainly involving the use of landfills, has manifested significant adverse environmental impacts caused by methane emissions from landfills and many other emissions from transfer stations. A short-term future scenario, where some of the landfills (which soon will reach their capacity because of rising amount of waste in Beijing City) are substituted by incinerators with energy recovery, would not result in significant environmental improvement. This is primarily because of the low calorific value of mixed waste, and it is likely that the incinerators would require significant amounts of auxiliary fuels to support combustion of wet waste. As for the long-term future scenario, efficient source separation of food waste could result in significant environmental improvements, primarily because of increase in calorific value of remaining waste incinerated with energy recovery. Sensitivity analysis emphasized the importance of efficient source separation of food waste, as well as the electricity recovery in incinerators, in order to obtain an environmentally friendly waste management system in Beijing City.

  10. ORNL long-range environmental and waste management plan: Program overview and summary

    SciTech Connect (OSTI)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.; du Mont, S.P.; Easterday, C.A.; Geisler, A.H.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Pudelek, R.E.; Rohwer, P.S.; Scanlan, T.F.; Stratton, L.E.; Trabalka, J.R.; Youngblood, E.L.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs.

  11. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  12. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs, Draft Environmental Impact Statement. Volume 1, Appendix D: Part A, Naval Spent Nuclear Fuel Management

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    Volume 1 to the Department of Energy`s Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Management Programs Environmental Impact Statement evaluates a range of alternatives for managing naval spent nuclear fuel expected to be removed from US Navy nuclear-powered vessels and prototype reactors through the year 2035. The Environmental Impact Statement (EIS) considers a range of alternatives for examining and storing naval spent nuclear fuel, including alternatives that terminate examination and involve storage close to the refueling or defueling site. The EIS covers the potential environmental impacts of each alternative, as well as cost impacts and impacts to the Naval Nuclear Propulsion Program mission. This Appendix covers aspects of the alternatives that involve managing naval spent nuclear fuel at four naval shipyards and the Naval Nuclear Propulsion Program Kesselring Site in West Milton, New York. This Appendix also covers the impacts of alternatives that involve examining naval spent nuclear fuel at the Expended Core Facility in Idaho and the potential impacts of constructing and operating an inspection facility at any of the Department of Energy (DOE) facilities considered in the EIS. This Appendix also considers the impacts of the alternative involving limited spent nuclear fuel examinations at Puget Sound Naval Shipyard. This Appendix does not address the impacts associated with storing naval spent nuclear fuel after it has been inspected and transferred to DOE facilities. These impacts are addressed in separate appendices for each DOE site.

  13. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  14. Written Statement of Dr. Monica Regalbuto Assistant Secretary for Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    United States Department of Energy Before the Subcommittee on Strategic Forces Committee on Armed Services United States House of Representatives February 11, 2016 Good morning Chairman Rogers, Ranking Member Cooper, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide you with an overview of the EM program, key accomplishments during the past year and what we plan to

  15. Written Statement of Dr. Monica Regalbuto Assistant Secretary for Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    United States Department of Energy Before the Subcommittee on Strategic Forces Committee on Armed Services United States Senate February 23, 2016 Good afternoon Chairman Sessions, Ranking Member Donnelly, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide you with an overview of the EM program, key accomplishments during the past year and what we plan to accomplish under

  16. A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

    SciTech Connect (OSTI)

    Ellis, Kristen; Schmitt, Elizabeth

    2013-07-01

    The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

  17. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F-1 APPENDIX F DIRECT AND INDIRECT IMPACTS: ASSESSMENT METHODOLOGY This appendix briefly describes the methods used to assess the potential direct and indirect effects of the alternatives in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Included in this appendix are discussions of general impact assessment methodologies for land resources, infrastructure, noise and vibration, air quality, geology and soils, water resources,

  18. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L-1 APPENDIX L GROUNDWATER FLOW FIELD DEVELOPMENT This appendix describes the development of the regional-scale groundwater flow field used for the groundwater modeling that supports assessment of the groundwater quality impacts discussed in the Draft and Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS), Chapters 5 and 6 and Appendices O and V. Included are an overview of groundwater flow at the site; the purpose

  19. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P-1 APPENDIX P ECOLOGICAL RESOURCES AND RISK ANALYSIS This appendix presents the ecological resources (see Section P.1) at the Hanford Site and lists the plants and animals evaluated in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Potential impacts of both airborne releases during operations and groundwater discharges under the various alternatives are evaluated in this appendix. The purpose of the risk analysis is to compare

  20. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R-1 APPENDIX R CUMULATIVE IMPACTS: ASSESSMENT METHODOLOGY This appendix describes the cumulative impacts methodology for the U.S. Department of Energy's Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The appendix is organized into sections on (1) regulations and guidance, (2) previous studies, (3) history of land use at the Hanford Site and in surrounding regions, (4) future land use at the Hanford Site, (5) future land use in

  1. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    APPENDIX S WASTE INVENTORIES FOR CUMULATIVE IMPACT ANALYSES Integral to development of the inventory data set for the cumulative impact analyses presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington was identification of those waste sites potentially contributing to cumulative impacts on groundwater. Their identification involved two semi-independent, convergent processes: a Waste Information Data System screen and a

  2. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T-1 Cumulative Impacts Effects on the environment that result from the proposed action when added to other past, present, and reasonably foreseeable future actions, regardless of what agency or person undertakes such other actions (40 CFR 1508.7). APPENDIX T SUPPORTING INFORMATION FOR THE SHORT-TERM CUMULATIVE IMPACT ANALYSES This appendix contains the detailed tables that support the short-term cumulative impacts presented in Chapter 6 of this Tank Closure and Waste Management Environmental

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    X-1 APPENDIX X SUPPLEMENT ANALYSIS OF THE DRAFT TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON Consistent with U.S. Department of Energy (DOE) Regulations (10 CFR 1021.314(c)(3)), "DOE shall make the determination and the related Supplement Analysis available to the public for information. Copies of the determination and Supplement Analysis shall be provided upon written request. DOE shall make copies available for inspection in

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 1 PROPOSED ACTIONS: BACKGROUND, PURPOSE AND NEED Chapter 1 describes the background, purpose and need for the agency action presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Section 1.1 provides summary information on the size and distribution of the waste inventory at the Hanford Site (Hanford), the specific objectives of this TC & WM EIS, and the regulatory basis for the proposed

  5. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  6. System requirements and design description for the environmental requirements management interface (ERMI)

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1997-09-30

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC.

  7. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    SciTech Connect (OSTI)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  8. Applications of Geographic Information Systems technology for environmental planning and management in North Carolina

    SciTech Connect (OSTI)

    Nagy, Z.; Wiele-Evans, C. Van Der )

    1993-01-01

    The State of North Carolina is developing a multipurpose geographic information systems (GIS) database for widespread use. The database currently consists of more than fifty categories of information state wide. In addition to basic planimetric information, the data include many categories of environmental significance. Much of the database has proven useful to planners, managers, and consultants involved with environmental policy-making and protection. The database is being used to augment activities in regulatory programs, research programs and in a variety of siting applications. The North Carolina Center for Geographic Information and Analysis (NCCGIA) has operated the State's GIS since 1977 and is the lead coordinating agency for geographic information in the state. NCCGIA is able to develop and maintain the corporate database through partnerships with other state, federal, regional, and local government agencies and private organizations. Users access the database at NCCGIA for the production of maps and statistics, to spontaneously generate displays of a project area, to acquire data, and to conduct special studies. This paper describes some of the activities associated with environmental planning and management applications at the North Carolina Center for Geographic Information and Analysis. Specifically, it illustrates the following: the conceptual framework for development and maintenance of the corporate database; the contents of the database; several environmental planning documents and applications developed at NCCGIA; and methods of data access.

  9. Environmental Performance Report 2012: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1-1B (Management Report)

    SciTech Connect (OSTI)

    Not Available

    2013-07-01

    This report presents a summary of NREL's environmental protection programs and activities for CY 2012. It is organized according to the different environmental media (e.g., air, waste, ground water, etc.), and includes a brief summary of how the program is managed in that area, any permitting or notification efforts that have been completed during the reporting period or are ongoing, and activities that have occurred during the reporting period in that environmental area. A description of the environmental condition and features of NREL's sites is also included to provide a basis for the program overview.

  10. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    SciTech Connect (OSTI)

    1992-04-29

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

  11. Environmental Management System (EMS) objectives & targets : annual results summary %3CU%2B2013%3E FY10.

    SciTech Connect (OSTI)

    Waffelaert, Pascale S.; Vetter, Douglas Walter

    2011-05-01

    Sandia National Laboratory/New Mexico's (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each fiscal year (FY) significant environmental aspects are identified and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are designed to mitigate the impact of SNL/NM's operations on the environment. An annual summary of the results achieved towards meeting established objectives and targets provides a connection to and rational for annually revised significant aspects. The purpose of this document is to summarize the results achieved and documented in FY2010.

  12. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES&H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES&H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES&H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES&H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES&H issues.

  13. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    SciTech Connect (OSTI)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  14. Environmental Performance Report 2013: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1-1B (Management Publication)

    SciTech Connect (OSTI)

    Schlomberg, K.; Eickhoff, J.; Beatty, B.; Braus, G.; Durbin, L.; Fiehweg, R.; Ray, M.; Ryon, T.; Schmitz, E.

    2014-08-01

    The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities for 2013, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have affected or could adversely affect the health, safety, and security of the public or workers; the environment; or the operations of DOE facilities. This report meets the requirements of the Annual Site Environmental Report and is prepared in accordance with the DOE Order 231.1B, Environment, Safety and Health Reporting.

  15. Case study: An environmental database management system for the auto-body painting process

    SciTech Connect (OSTI)

    Shepard, S.; Souten, D.

    1996-12-31

    The auto-body painting process is subject to numerous environmental regulations, including those directed toward hazardous waste, water pollution prevention, workplace safety, and air pollution. Each environmental regulatory compliance area requires extensive record keeping and reporting of information. Incomplete or untimely reporting and record keeping can result in significant adverse actions by regulatory agencies. Additionally, good data record keeping allows management to have better internal knowledge of plant operations with respect to environmental concerns. The record keeping and reporting prior to the development of the database management system described here were performed using spreadsheets. Although spreadsheets are useful for conducting numerical calculations and plots, they are inflexible to the addition and deletion of different materials (such as paint colors) from year to year. They are clumsy with large amounts of data, and they do not have the querying capabilities of a database. In light of the ever changing reporting requirements to different regulatory agencies, reporting and tracking of emissions data using spreadsheets rapidly becomes extremely difficult. This paper describes the design and implementation of the air pollution portion of an environmental database management system starting with one model year`s worth of spreadsheet data. The design consisted of converting all the relevant data into the database format (including coefficients for calculations within the spreadsheets), formulating a relational model for the data, and designing the user-interface. The program implementation was done in Microsoft Access 2.0. The database design, program features, project successes and difficulties we faced are presented as our example outputs.

  16. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives. (DMC)

  17. Environmental Management Technology Leveraging Initiative. Topical report, October 1, 1995--September 30, 1996

    SciTech Connect (OSTI)

    1996-12-31

    The ``Environmental Management Technology Leveraging Initiative,`` a cooperative agreement between the Global Environment and Technology Foundation and the Department of Energy-Morgantown Energy Technology Center, has completed its second year. This program, referred to as the Global Environmental Technology Enterprise (GETE) is an experiment to bring together the public and private sectors to identify, formulate, promote and refine methods to develop more cost-effective clean-up treatments. Working closely with Department of Energy officials, National Laboratory representatives, business people, academia, community groups, and other stakeholders, this program attempts to commercialize innovative, DOE-developed technologies. The methodology to do so incorporates three elements: business assistance, information, and outreach. A key advance this year was the development of a commercialization guidance document which can be used to diagnose the commercialization level and needs for innovative technologies.

  18. EIS-0423-S1: Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

    Broader source: Energy.gov [DOE]

    This SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It will analyze the potential environmental impact for a facility at and in the vicinity of the Waste Isolation Pilot Plant near Carlsbad, New Mexico.

  19. Success stories? an analysis of stakeholder involvement in the Department of Energy`s Office of Environmental Management

    SciTech Connect (OSTI)

    Beck, D.M.; Kelly, C.; Forbes, E.

    1995-12-01

    In several studies conducted by the Office of Environmental Management, the Department of Energy (DOE) has begun its first analysis of the benefits of stakeholder involvement. The studies seek to determine how public participation in DOE activities has contributed to cost savings, has changed the course of action for environmental projects, and has influenced the priorities of a national environmental program. This presentation will discuss the results and conclusions of following three studies: Stakeholder Survey of Trust and Confidence; the Success Stories study; and the Site-Specific Advisory Board Evaluation. These studies are taking their data from environmental management projects at Department of Energy sites throughout the United States. The studies of stakeholder involvement are currently analyzing the role of several variables in stakeholder involvement including the climate surrounding the environmental project or decision, the strategies used by DOE, the nature of the actual interactions, the attempts to reach consensus among interested parties, the role played by primary decision-makers, the goals set by the Department or by its stakeholders, and the revision of strategies during the stakeholder involvement process. Based on this analysis the planning and execution of future stakeholder involvement activities in Environmental Management will be improved. The study goal of establishing a set of factors that characterize successful stakeholder involvement within the Environmental Management program, will allow inference as to stakeholder involvement in other Federal and private environmental projects.

  20. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  1. UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT WASTE PROCESSING ANNUAL TECHNOLOGY DEVELOPMENT REPORT 2008

    SciTech Connect (OSTI)

    Bush, S.

    2009-11-05

    The Office of Waste Processing identifies and reduces engineering and technical risks and uncertainties of the waste processing programs and projects of the Department of Energy's Environmental Management (EM) mission through the timely development of solutions to technical issues. The risks, and actions taken to mitigate those risks, are determined through technology readiness assessments, program reviews, technology information exchanges, external technical reviews, technical assistance, and targeted technology development and deployment. The Office of Waste Processing works with other DOE Headquarters offices and project and field organizations to proactively evaluate technical needs, identify multi-site solutions, and improve the technology and engineering associated with project and contract management. Participants in this program are empowered with the authority, resources, and training to implement their defined priorities, roles, and responsibilities. The Office of Waste Processing Multi-Year Program Plan (MYPP) supports the goals and objectives of the U.S. Department of Energy (DOE) - Office of Environmental Management Engineering and Technology Roadmap by providing direction for technology enhancement, development, and demonstration that will lead to a reduction of technical risks and uncertainties in EM waste processing activities. The MYPP summarizes the program areas and the scope of activities within each program area proposed for the next five years to improve safety and reduce costs and environmental impacts associated with waste processing; authorized budget levels will impact how much of the scope of activities can be executed, on a year-to-year basis. Waste Processing Program activities within the Roadmap and the MYPP are described in these seven program areas: (1) Improved Waste Storage Technology; (2) Reliable and Efficient Waste Retrieval Technologies; (3) Enhanced Tank Closure Processes; (4) Next-Generation Pretreatment Solutions; (5

  2. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  3. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 1 of 3

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.

  4. DOE/NV--958 U.S. DEPARTMENT OF ENERGY NEVADA TEST SITE ENVIRONMENTAL MANAGEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    958 U.S. DEPARTMENT OF ENERGY NEVADA TEST SITE ENVIRONMENTAL MANAGEMENT END STATE VISION January 2006 Available for sale to the public from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chapter 5 ▪ Long-Term Environmental Consequences 5-1163 5.3.3 Ecological Risk This section presents the results of the evaluation of long-term impacts on ecological resources of releases to air and groundwater under the Waste Management alternatives. Risk indices-Hazard Quotient and Hazard Index-were calculated by comparing the predicted dose to the benchmark dose (see Appendix P). Risk indices could not be calculated for soil-dwelling invertebrates, lizards, toads, or birds exposed to organic

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 OVERVIEW OF THE PUBLIC COMMENT PROCESS 1-1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS This section of this Comment-Response Document (CRD) describes the public comment process for the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. Section 1.1 summarizes the organization of this CRD. Section 1.2 discusses the public comment process and the means

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ▪ Public Comments and DOE Responses 3-1053 Campaign A March 16, 2010 As a resident of the Pacifc Northwest, I oppose the "preferred alternative" to ship nuclear waste from other Department of Energy sites to Hanford, as outlined in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (DOE/EIS--0391). I vehemently oppose the plan to add more radioactive waste to the Hanford site. Shipping this waste along Northwest

  8. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    SciTech Connect (OSTI)

    Custer, W.R. Jr.; Messick, C.D.

    1996-03-31

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

  9. Managing the global environmental risks in Russia: The missing links and external influences

    SciTech Connect (OSTI)

    Sokolov, V.

    1996-12-31

    Based on analysis of management history of three global environmental issues in Russia--climate change, ozone depletion and acid rains--the author suggests a few explanations of failure to build-up the nationwide strategy to manage global risks. Among them are specific factors related to the science-policy relationship on global changes processes and impacts. Particular attention is given to such internal factors as: the monopolization of these issues by the single state agency Hydromet until the late 1980s; the interest of the Soviet military in global atmospheric issues; the absence of any major input from the public or the media; and the manner in which the discussion of these issues was nested within the Soviet government`s broader foreign policy agenda.

  10. Environmental sensor networks and continuous data quality assurance to manage salinity within a highly regulated river basin

    SciTech Connect (OSTI)

    Quinn, N.W.T.; Ortega, R.; Holm, L.

    2010-01-05

    This paper describes a new approach to environmental decision support for salinity management in the San Joaquin Basin of California that focuses on web-based data sharing using YSI Econet technology and continuous data quality management using a novel software tool, Aquarius.

  11. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  12. An aerial radiological survey of the Fernald Environmental Management Project and surrounding area, Fernald, Ohio

    SciTech Connect (OSTI)

    Phoenix, K.A.

    1997-04-01

    An aerial radiological survey was conducted from May 17--22, 1994, over a 36 square mile (93 square kilometer) area centered on the Fernald Environmental Management Project located in Fernald, Ohio. The purpose of the survey was to detect anomalous gamma radiation in the environment surrounding the plant. The survey was conducted at a nominal altitude of 150 feet (46 meters) with a line spacing of 250 feet (76 meters). A contour map of the terrestrial gamma exposure rate extrapolated to 1 meter (3.3 feet) above ground was prepared and overlaid on an aerial photograph of the area. Analysis of the data for man made sources showed five sites within the boundaries of the Fernald Environmental Management Project having elevated readings. The exposure rates outside the plant boundary were typical of naturally occurring background radiation. Soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries to supplement the aerial data. It was concluded that although the radionuclides identified in the high-exposure-rate areas are naturally occurring, the levels encountered are greatly enhanced due to industrial activities at the plant.

  13. Environmental surveillance for EG&G Idaho Waste Management facilities at the Idaho National Engineering Laboratory. 1993 annual report

    SciTech Connect (OSTI)

    Wilhelmsen, R.N.; Wright, K.C.; McBride, D.W.; Borsella, B.W.

    1994-08-01

    This report describes calendar year 1993 environmental surveillance activities of Environmental Monitoring of EG&G Idaho, Inc., performed at EG&G Idaho operated Waste Management facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Included are results of the sampling performed by the Radiological and Environmental Sciences Laboratory and the United States Geological Survey. The primary purposes of monitoring are to evaluate environmental conditions, to provide and interpret data, to ensure compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1993 environmental surveillance data with US Department of Energy derived concentration guides and with data from previous years.

  14. Environmental assessment for the Radioactive and Mixed Waste Management Facility: Sandia National Laboratories/New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0466) under the National Environmental Policy Act (NEPA) of 1969 for the proposed completion of construction and subsequent operation of a central Radioactive and Mixed Waste Management Facility (RMWMF), in the southeastern portion of Technical Area III at Sandia National Laboratory, Albuquerque (SNLA). The RMWMF is designed to receive, store, characterize, conduct limited bench-scale treatment of, repackage, and certify low-level waste (LLW) and mixed waste (MW) (as necessary) for shipment to an offsite disposal or treatment facility. The RMWMF was partially constructed in 1989. Due to changing regulatory requirements, planned facility upgrades would be undertaken as part of the proposed action. These upgrades would include paving of road surfaces and work areas, installation of pumping equipment and lines for surface impoundment, and design and construction of air locks and truck decontamination and water treatment systems. The proposed action also includes an adjacent corrosive and reactive metals storage area, and associated roads and paving. LLW and MW generated at SNLA would be transported from the technical areas to the RMWMF in containers approved by the Department of Transportation. The RMWMF would not handle nonradioactive hazardous waste. Based on the analysis in the EA, the proposed completion of construction and operation of the RMWMF does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, preparation of an environmental impact statement for the proposed action is not required.

  15. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  16. Nuclear waste management and environmental mediation: an exploratory analysis Topical report

    SciTech Connect (OSTI)

    Greene, M.R.; Lindell, M.K.; Nealey, S.M.; Drexler, J.A. Jr.

    1980-09-01

    Two types of mediation efforts are identified: settlement-oriented mediation and participation-oriented mediation. A range of environmental mediation efforts that have taken place to date are discussed. Within the context of the two identified types of mediation, these characteristics are discussed for the waste management controversy. Emphasis was placed on the complexity of the issues and the range of participants. Also discussed are the relationship between an environmental mediation effort and alternative mechanisms for conflict resolution, such as NEPA based litigation, consultation and concurrence and state veto or federal preemption. Participation-oriented mediation may be more suitable than settlement-oriented mediation for encouraging constructive communication and reducing conflict among participants in the controversy. Several limitations to participation-oriented mediation need to be considered. One is that environmental mediation is such a very new field that it might not be possible to find an experienced mediator willing to attempt such a complex problem. Two is the compatibility of participation-oriented and settlement-oriented mediation.

  17. UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT REPORT FISCAL YEAR 2010

    SciTech Connect (OSTI)

    Bush, S.

    2010-10-22

    The mission of the Department of Energy's (DOE's) Office of Environmental Management (EM) is to clean up the environmental legacy of nuclear weapons research and production during the Cold War. That mission includes cleaning up nuclear waste, contaminated groundwater and soil, nuclear materials, and contaminated facilities covering two million acres of land in thirty-five states. EM's principal program goals include timely completion of tank waste treatment facilities, reduction of the life-cycle costs and acceleration of the cleanup of the Cold War legacy, and reduction of the EM footprint. The mission of the EM Technology Innovation and Development program is to transform science and innovation into practical solutions to achieve the EM mission. During fiscal year 2010 (October 2009-September 2010), EM focused upon accelerating environmental cleanup by expeditiously filling identified gaps in available knowledge and technology in the EM program areas. This report describes some of the approaches and transformational technologies in tank waste processing, groundwater and soil remediation, nuclear materials disposition, and facility deactivation and decommissioning developed during fiscal year 2010 that will enable EM to meet its most pressing program goals.

  18. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  19. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT- CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS

    SciTech Connect (OSTI)

    Seitz, R.

    2013-02-26

    The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  20. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-04-14

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  1. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect (OSTI)

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  2. Calculation Package for the Analysis of Performance of Cells 1-6, with Underdrain, of the Environmental Management Waste Management Facility Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Gonzales D.

    2010-03-30

    This calculation package presents the results of an assessment of the performance of the 6 cell design of the Environmental Management Waste Management Facility (EMWMF). The calculations show that the new cell 6 design at the EMWMF meets the current WAC requirement. QA/QC steps were taken to verify the input/output data for the risk model and data transfer from modeling output files to tables and calculation.

  3. Innovative environmental restoration and waste management technologies at Argonne National Laboratory

    SciTech Connect (OSTI)

    Helt, J.E.

    1993-09-01

    Cleanup of contaminated sites and management of wastes have become major efforts of the US Department of Energy. Argonne National Laboratory (ANL) is developing several new technologies to meet the needs of this national effort. Some of these efforts are being done in collaboration with private sector firms. An overview of the ANL and private sector efforts will be presented. The following four specific technologies will be discussed in detail: (1) a minimum additive waste stabilization (MAWS) system for treating actinide-contaminated soil and groundwater; (2) a magnetic separation system, also for cleanup of actinide-contaminated soil and groundwater; (3) a mobile evaporator/concentrator system for processing aqueous radioactive and mixed waste; and (4) a continuous emission monitor for ensuring that waste incineration meets environmental goals.

  4. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  5. UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM ANNUAL REPORT FOR 2007

    SciTech Connect (OSTI)

    Marra, J

    2008-08-26

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. The Office of Engineering and Technology has developed a Technology Roadmap and a Multi-year Program Plan to identify technology needs and identify areas for focused research and development to support DOE-EM's environmental cleanup and waste management objectives. The international cooperative program is an important element of the technology development roadmap, leveraging of world-wide expertise in the advancement and deployment of remediation and treatment technologies. Introductory briefings aimed at furthering familiarity with the DOE-EM mission, and the vital role that technology development plays within it, were presented at two international meetings. The Office of Engineering and Technology currently works with the Khlopin Radium Institute (KRI) and SIA Radon Institute in Russia, the International Radioecology Laboratory (IRL) in Ukraine and the Nuclear Engineering and Technology Institute (NETEC) in South Korea through cooperative bilateral arrangements to support EM's accelerated cleanup and closure mission.

  6. Chemical characteristics of urban stormwater sediments and implications for environmental management, Maricopa County, Arizona

    SciTech Connect (OSTI)

    Parker, J.T.C.; Fossum, K.D.; Ingersoll, T.L.

    2000-07-01

    Investigations of the chemical characteristics of urban stormwater sediments in the rapidly growing Phoenix metropolitan area of Maricopa County, Arizona, showed that the inorganic component of these sediments generally reflects geologic background values. Some concentrations of metals were above background values, especially cadmium, copper, lead, and zinc, indicating an anthropogenic contribution of these elements to the sediment chemistry. Concentrations, however, were not at levels that would require soil remediation according to guidelines of the US Environmental Protection Agency. Arsenic concentrations generally were above recommended values for remediation at a few sites, but these concentrations seem to reflect geologic rather than anthropogenic factors. Several organochlorine compounds no longer in use were ubiquitous in the Phoenix area, although concentrations generally were low. Chlordane, DDT and its decay products DDE and DDD, dieldrin, toxaphene, and PCBs were found at almost all sites sampled, although some of the pesticides in which these compounds are found have been banned for almost 30 years. A few sites showed exceptionally high concentrations of organochlorine compounds. On the basis of published guidelines, urban stormwater sediments do not appear to constitute a major regional environmental problem with respect to the chemical characteristics investigated here. At individual sites, high concentrations of organic compounds--chlordane, dieldrin, PCBs, and toxaphene--may require some attention. The possible environmental hazard presented by low-level organochlorine contamination is not addresses in this paper; however, high levels of toxicity in urban sediments are difficult to explain. Sediment toxicity varied significantly with time, which indicates that these tests should be evaluated carefully before they are used for management decisions.

  7. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL FACILITIES An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION DOE/GO-102001-1165 Section DOE/GO-102001-1165 NREL/BK-710-29267 May 2001 i Greening Federal Facilities An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION "Then I say the earth belongs to each ... generation during its course, fully and in its own right, no generation can contract debts greater than

  8. The Integrated Cloud-based Environmental Data Management System at Los Alamos National Laboratory - 13391

    SciTech Connect (OSTI)

    Schultz Paige, Karen; Gomez, Penny; Patel, Nita P.; EchoHawk, Chris; Dorries, Alison M.

    2013-07-01

    In today's world, instant access to information is taken for granted. The national labs are no exception; our data users expect immediate access to their data. Los Alamos National Laboratory (LANL) has collected over ten million records, and the data needs to be accessible to scientists as well as the public. The data span a wide range of media, analytes, time periods, formats, and quality and have traditionally existed in scattered databases, making comprehensive work with the data impossible. Recently, LANL has successfully integrated all their environmental data into a single, cloud-based, web-accessible data management system. The system combines data transparency to the public with immediate access required by the technical staff. The use of automatic electronic data validation has been critical to immediate data access while saving millions of dollars and increasing data consistency and quality. The system includes a Google Maps based GIS tool that is simple enough for people to locate potentially contaminated sites near their home or workplace, and complex enough to allow scientists to plot and trend their data at the surface and at depth as well as over time. A variety of formatted reports can be run at any desired frequency to report the most current data available in the data base. The advanced user can also run free form queries of the data base. This data management system has saved LANL time and money, an increasingly important accomplishment during periods of budget cuts with increasing demand for immediate electronic services. (authors)

  9. THE U.S. DEPARTMENT OF ENERGY-OFFICE OF ENVIRONMENTAL MANAGEMENT'S INTERNATIONAL PROGRAM

    SciTech Connect (OSTI)

    Harbour, J; James Marra, J; David Peeler, D; Jay Roach , J; Bond Calloway, B

    2007-02-08

    The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with the various international institutes (e.g. Russian Federal Atomic Energy Agency--Rosatom and Ukraine government's Chornobyl Center-International Radioecology Laboratory (CC-IRL)) for many years on radioactive waste management challenges of mutual concern. Currently, EM is cooperating with Rosatom and the Ukraine's CC-IRL to explore issues related to high-level waste and to investigate experience and technologies that could support EM site cleanup needs. EM is currently implementing five collaborative projects with other international institutes on nuclear waste issues: (1) Application of the Cold Crucible Induction Heated Melter to DOE Wastes; SIA Radon, Moscow. (2) Design Improvements to the Cold Crucible Induction Heated Melter; Electrotechnical University, St. Petersburg. (3) Improve Retention of Radionuclides in Cement Type Waste Forms; Khlopin Radium Institute, St. Petersburg. (4) Improved Solubility and Retention of Troublesome Components in SRS and Hanford HLW Glasses; Khlopin Radium Institute, St. Petersburg. (5) Long-term Impacts from Radiation/Contamination within the Chornobyl Exclusion Zone, Chornobyl Center, International Radioecology Laboratory, Ukraine The purpose of this paper is to provide an overview of EM's objectives for participating in cooperative activities with various international institutes. Additionally, this paper presents programmatic and technical information on these activities, and outlines specific technical collaborations currently underway and planned to support DOE's cleanup and closure mission.

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    SciTech Connect (OSTI)

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  11. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  12. WM2014 Conference- Building the Community of Practice for Performance and Risk Assessment in Support of Risk-Informed Environmental Management Decisions

    Broader source: Energy.gov [DOE]

    WM2014 Conference - Building the Community of Practice for Performance and Risk Assessment in Support of Risk-Informed Environmental Management Decisions - 14575

  13. Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy Industry

    Office of Energy Efficiency and Renewable Energy (EERE)

    On February 24, 2016, Environmental Interactions of Marine Renewable Energy Technologies hosted workshops on environmental impacts of marine renewable energy, in advance of the 2016 International...

  14. OVERVIEW OF IMPACTS OF TECHNOLOGY DEPLOYMENT ON THE MISSION OF THE DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT

    SciTech Connect (OSTI)

    McCabe, D.; Chamberlain, G.; Looney, B.; Gladden, J.

    2010-11-30

    The Environmental Management (EM) mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The EM program has embraced a mission completion philosophy based on reducing risk and environmental liability over a 40-50 year lifecycle. The Department has made great progress toward safely disposing of its legacy nuclear waste. EM Research and Development (R&D) program management strategies have driven numerous technology and engineering innovations to reduce risk, minimize cleanup costs, and reduce schedules. Engineering and technology investments have provided the engineering foundation, technical assistance, approaches, and technologies that have contributed to moving the cleanup effort forward. These successes include start-up and operation of several waste treatment facilities and processes at the sites.

  15. Environmental Management at the Nevada Test Site Year 2001 Current Status

    SciTech Connect (OSTI)

    Becker, B. D.; Gertz, C. P.; Clayton, W. A.; Carilli, J. T.; DiSanza, E. F.; Wycoff, R. C.; Crowe, B. M.

    2002-02-26

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations. Additionally, the Nevada Operations Office Environmental Restoration Division is responsible for identifying the nature and extent of contamination; determining its potential risk to the public and the environment; and performing the necessary corrective actions in compliance with guidelines and requirements. This paper summarizes just a few of the successes of the Nevada Operations Office projects.

  16. Performance Measures for Evaluating Public Participation Activities in the Office of Environmental Management (DOE)

    SciTech Connect (OSTI)

    Carnes, S.A.

    2001-02-15

    Public participation in Office of Environmental Management (EM) activities throughout the DOE complex is a critical component of the overall success of remediation and waste management efforts. The challenges facing EM and its stakeholders over the next decade or more are daunting (Nuclear Waste News 1996). Achieving a mission composed of such challenges will require innovation, dedication, and a significant degree of good will among all stakeholders. EM's efforts to date, including obtaining and using inputs offered by EM stakeholders, have been notable. Public participation specialists have accepted and met challenges and have consistently tried to improve their performance. They have reported their experiences both formally and informally (e.g., at professional conferences and EM Public Participation Network Workshops, other internal meetings of DOE and contractor public participation specialists, and one-on-one consultations) in order to advance the state of their practice. Our research, and our field research in particular (including our interactions with many representatives of numerous stakeholder groups at nine DOE sites with diverse EM problems), have shown that it, is possible to develop coherent results even in a problem domain as complex as that of EM. We conclude that performance-based evaluations of public participation appear possible, and we have recommended an approach, based on combined and integrated multi-stakeholder views on the attributes of successful public participation and associated performance indicators, that seems workable and should be acceptable to diverse stakeholders. Of course, as an untested recommendation, our approach needs the validation that can only be achieved by application (perhaps at a few DOE sites with ongoing EM activities). Such an application would serve to refine the proposed approach in terms of its clarity, its workability, and its potential for full-scale use by EM and, potentially, other government agencies and

  17. Development and use of innovative approaches to waste management and environmental restoration: Potential liability and its implications

    SciTech Connect (OSTI)

    Owens, W.L.

    1990-12-01

    The US Department of Energy (DOE) has established as its goal to have all of its facilities cleaned up and in compliance with all applicable environmental laws by the year 2019. As part of its plan to achieve that goal, DOE created, in November 1989, an Office of Environmental Restoration and Waste Management (EM) and, within EM, an Office of Technology Development (OTD). Since the achievement of DOE's long-term objective in the area of waste management and environmental restoration is not possible utilizing only existing technology, the importance of OTD's mission is clear. A question has been raised regarding the nature of the potential liability associated with development, testing, and use of new technologies for waste management and environmental restoration; and the impact it may have on the ability or willingness of other parties to participate in DOE's technology development program. This report is intended to provide at least a preliminary answer to the question. Given the range of activities involved in the technology development process, there are many circumstances that could result in liability. Therefore, the discussion here is somewhat general. It may, however, provide a base for more detailed analysis, at a later time, of liability issues raised by specific circumstances.

  18. Environmental management technology demonstration and commercialization: Tasks 2, 3, 4, and 8. Semiannual report, October 1994--March 1995

    SciTech Connect (OSTI)

    Hawthorne, S.B.; Ness, R.O. Jr.; Nowok, J.W.; Pflughoeft-Hassett, D.; Hurley, J.P.; Steadman, E.N.

    1995-05-01

    The objective of the Environmental Management program at the Energy and Environmental Research Center (EERC) is to develop, demonstrate, and commercialize technologies that address the environmental management needs of contaminated sites, including characterization, sensors, and monitoring; low-level mixed waste processing; material disposition technology; improved waste forms; in situ containment and remediation; and efficient separation technologies for radioactive wastes. Task 2 is the extraction and analysis of pollutant organics from contaminated solids using off-line supercritical fluid extraction (SFE) and on-line SFE-infrared spectroscopy. Task 3, pyrolysis of plastics, has as its objectives to develop a commercial process to significantly reduce the volume of mixed-plastics-paper-resin waste contaminated with low-level radioactive material; concentrate contaminants in a collectible form; and determine the distribution and form of contaminants after pyrolysis of the mixed waste. Task 4, stabilization of vitrified wastes, has as its objectives to (1) demonstrate a waste vitrification procedure for enhanced stabilization of waste materials and (2) develop a testing protocol to understand the long-term leaching behavior of the stabilized waste form. The primary objective of Task 8, Management and reporting, is coordination of this project with other programs and opportunities. In addition, management oversight will be maintained to ensure that tasks are completed and coordinated as planned and that deliverables are submitted in a timely manner. Accomplishments to date is each task are described. 62 refs.

  19. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook

    SciTech Connect (OSTI)

    2010-06-17

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  20. Environmental Performance Report 2011: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B (Management Report)

    SciTech Connect (OSTI)

    Not Available

    2012-09-01

    Purpose: NREL's Environmental Performance Report provides a description of the lab's environmental activities for 2011 including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes.

  1. Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

    SciTech Connect (OSTI)

    2009-01-01

    Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and

  2. Corrective action management unit application for the Environmental Restoration Disposal Facility

    SciTech Connect (OSTI)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  3. The DOE Office of Environmental Management International Cooperative Program: Overview of Technical Tasks and Results

    SciTech Connect (OSTI)

    Marra, James C.; Fox, Kevin M.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Lopukh, D. B.; Bondarkov, M. D.; Gerdes, Kurt D.; Han, Ana M.

    2010-01-22

    The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EMs International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) LETI is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based

  4. THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL COOPERATIVE PROGRAM: OVERVIEW OF TECHNICAL TASKS AND RESULTS

    SciTech Connect (OSTI)

    Marra, J.; Fox, K.; Farfan, E.; Jannik, T.

    2009-12-08

    The DOE Office of Environmental Management (DOE-EM) Office of Engineering and Technology is responsible for implementing EM's International Cooperative Program. Over the past 15 years, collaborative work has been conducted through this program with researchers in Russia, Ukraine, France, United Kingdom and Republic of Korea. Currently, work is being conducted with researchers in Russia and Ukraine. Efforts aimed at evaluating and advancing technologies to support U.S. high-level waste (HLW) vitrification initiatives are being conducted in collaboration with Russian researchers. Work at Khlopin Radium Institute (KRI) is targeted at improving the throughput of current vitrification processes by increasing melting rate. These efforts are specifically targeted at challenging waste types identified at the Savannah River Site (SRS) and Hanford Site. The objectives of current efforts at SIA Radon are to gain insight into vitrification process limits for the cold crucible induction melter (CCIM) technology. Previous demonstration testing has shown that the CCIM offers the potential for dramatic increases in waste loading and waste throughput. However, little information is known regarding operational limits that could affect long-term, efficient CCIM operations. Collaborative work with the Russian Electrotechnical University (ETU) 'LETI' is aimed at advancing CCIM process monitoring, process control and design. The goal is to further mature the CCIM technology and to establish it as a viable HLW vitrification technology. The greater than two year effort conducted with the International Radioecology Laboratory in the Ukraine recently completed. The objectives of this study were: to assess the long-term impacts to the environment from radiation exposure in the Chernobyl Exclusion Zone (ChEZ); and to provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories around the Chernobyl Nuclear Power Plant (ChNPP) based

  5. Draft Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2004-02-27

    This ''Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' (LLNL SW/SPEIS) describes the purpose and need for agency action for the continued operation of LLNL and analyzes the environmental impacts of these operations. The primary purpose of continuing operation of LLNL is to provide support for the National Nuclear Security Administration's (NNSA's) nuclear weapons stockpile stewardship missions. LLNL, located about 40 miles east of San Francisco, California, is also needed to support other U.S. Department of Energy (DOE) programs and Federal agencies such as the U.S. Department of Defense, Nuclear Regulatory Commission, U.S. Environmental Protection Agency (EPA), and the newly established U.S. Department of Homeland Security. This LLNL SW/SPEIS analyzes the environmental impacts of reasonable alternatives for ongoing and foreseeable future operations, facilities, and activities at LLNL. The reasonable alternatives include the No Action Alternative, Proposed Action, and the Reduced Operation Alternative. The major decision to be made by DOE/NNSA is to select one of the alternatives for the continued operation of the LLNL. As part of the Proposed Action, DOE/NNSA is considering: using additional materials including plutonium on the National Ignition Facility (NIF); increasing the administrative limit for plutonium in the Superblock, which includes the Plutonium Facility, the Tritium Facility, and the Hardened Engineering Test Building; conducting the Integrated Technology Project, using laser isotope separation to provide material for Stockpile Stewardship experiments, in the Plutonium Facility; increasing the material-at-risk limit for the Plutonium Facility; and increasing the Tritium Facility material-at-risk. A discussion of these issues is presented in Section S.5.2, Proposed Action. The ''National

  6. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    SciTech Connect (OSTI)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  7. Tethys: The Marine and Hydrokinetic Technology Environmental Impacts Knowledge Management System -- Requirements Specification -- Version 1.0

    SciTech Connect (OSTI)

    Butner, R. Scott; Snowden-Swan, Lesley J.; Ellis, Peter C.

    2010-11-09

    The marine and hydrokinetic (MHK) environmental impacts knowledge management system (KMS), dubbed Tethys after the mythical Greek goddess of the seas, is being developed for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy Wind and Hydropower Technologies Program (WHTP) by Pacific Northwest National Laboratory (PNNL). This requirements specification establishes the essential capabilities required of Tethys and clarifies for WHTP and the Tethys development team the results that must be achieved by the system.

  8. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect (OSTI)

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  9. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    SciTech Connect (OSTI)

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  10. Seven Small Businesses Awarded Contracts by the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Today the Energy Department announced contract awards to seven small-disadvantaged businesses to perform critical technical services. The contracts, awarded by the Office of Environmental...

  11. Health and environmental chemistry: Analytical techniques, data management, and quality assurance. Volume 1, Manual

    SciTech Connect (OSTI)

    Gautier, M.A.

    1993-11-01

    Analytical procedures are described for the determination of organic compounds, metals and radioisotopes in environmental materials, human tissues, urine, feces, and waste water.

  12. Environmental Restoration and Waste Management Site-Specific Plan for the Oak Ridge Reservation. [Appendix contains accromyms list and maps of waste management facilities

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance at its waste sites and facilities, while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities, planned and completed, undertaken to implement these FYP goals at the DOE Field Office-Oak Ridge (DOE/OR) installations and programs; specifically, for the Oak Ridge Reservation (ORR), Oak Ridge Associated Universities (ORAU), and Hazardous Waste Remedial Action Program (HAZWRAP). Activities described in this SSP address hazardous, radioactive, mixed, and sanitary wastes, along with treatment, storage, and disposal of current production waste and legacy waste from past operation. The SSP is presented in sections emphasizing Corrective Activities (A), Environmental Restoration (ER), Waste Management (WM), Technology Development (TD), and Transportation; and includes descriptions of activities, resources, and milestones by installation or program. 87 tabs.

  13. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    SciTech Connect (OSTI)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  14. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  15. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    SciTech Connect (OSTI)

    Josimović, Boško Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  16. Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs, Raymer J.E.

    2008-06-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets

  17. Written Statement of James Owendoff Acting Principal Deputy Assistant Secretary for Environmental Management

    Office of Environmental Management (EM)

    Receptacles | Department of Energy Charging: Safety and Management Policy For Level 1 Charging Receptacles Workplace Charging: Safety and Management Policy For Level 1 Charging Receptacles Organizations offering plug-in electric vehicle (PEV) charging at Level 1 charging receptacles, or wall outlets, can ensure a safe and successful workplace charging experience by considering the following safety and management policies below. More helpful tips on workplace charging administration,

  18. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  19. Environmental Guidelines for Development of Cultural Resource Management Plans--Update

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-09-22

    This Guide provides guidelines for the development of an individual Cultural Resource Management Plan for each DOE facility and program. Canceled by DOE N 251.82.

  20. Executive Order 13148Greening the Government Through Leadership in Environmental Management

    Broader source: Energy.gov [DOE]

    The head of each Federal agency is responsible for ensuring that all necessary actions are taken to integrate environmental accountability into agency day-to-day decisionmaking and long-term...

  1. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Sanderson, C.G.; Greenlaw, P.; Pan, V.

    1995-07-03

    This report presents the results from the analysis of the 42st set of environmental quality assessment samples (QAP XLII) that were received on or before June 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.

  2. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Greenlaw, P.D.; Minick, S.K.

    1998-07-01

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. This report presents the results from the analysis of the 48th set of environmental quality assessment samples (QAP XLVIII) that were received on or before June 1, 1998.

  3. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Greenlaw, P.D.

    1998-01-01

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 4 days after the reporting deadline via the Internet at www.eml.doe.gov. This report presents the results from the analysis of the 47th set of environmental quality assessment samples (QAP XLVII) that were received on or before December 1, 1997.

  4. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Sanderson, C.G.; Greenlaw, P.

    1996-02-01

    This report presents the results from the analysis of the 43rd set of environmental quality assessment samples (QAP XLIII) that were received on or before December 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.

  5. Dr. Monica Regalbuto Confirmed as Department of Energy Assistant Secretary for Environmental Management

    Broader source: Energy.gov [DOE]

    Dr. Regalbuto will provide the leadership necessary to continue the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research.

  6. DOE Environmental Management Strategy and Experience for In-Situ Decommissioning

    Broader source: Energy.gov [DOE]

    In situ decommissioning (ISD) is the permanent entombment of a contaminated facility. At present, ISD is not recognized or addressed in the Department of Energy (DOE) and Office of Environmental...

  7. EO 13148: Greening the Government Through Leadership in Environmental Management (2000)

    Broader source: Energy.gov [DOE]

    The head of each Federal agency is responsible for ensuring that all necessary actions are taken to integrate environmental accountability into agency day-to-day decisionmaking and long-term...

  8. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Greenlaw, Pamela D.

    1999-12-31

    This report presents the results from the analysis of the 51st set of environmental quality assessment samples (QAP-LI) that were received on or before December 2, 1999.

  9. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    SciTech Connect (OSTI)

    Greenlaw, Pamela D.; Berne, Anna

    2000-06-30

    This report presents the results from the analysis of the 52nd set of environmental quality assessment samples (QAP-LII) that were received on or before June 3, 2000.

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 CHAPTER 7 ENVIRONMENTAL CONSEQUENCES AND MITIGATION DISCUSSION Chapter 7 discusses environmental consequences that would occur due to implementation of the reasonable alternatives for each of the following: (1) tank waste retrieval, treatment, and disposal and single-shell tank system closure at the Hanford Site (i.e., tank closure); (2) decommissioning of the Fast Flux Test Facility and auxiliary facilities and disposition of the inventory of radioactively contaminated bulk sodium (i.e.,

  11. Environmental Management Science Program Symposium at the Fall 2001 Meeting of the American Chemical Society. Final technical report from 08/01/2001 to 07/31/2002

    SciTech Connect (OSTI)

    Nagy, Kathryn L.; Felmy, Andrew R.

    2002-10-01

    The American Chemical Society held its 22nd National Meeting in Chicago, Illinois, August 26-30, 2001. During this meeting, the Environmental Management Science Program Symposium was held.

  12. Defending mining claims and mineral leases in environmental suits against federal land managers

    SciTech Connect (OSTI)

    Twelker, E. )

    1989-01-01

    Suits in the last 4-5 years jeopardize the title of thousands of mining claims and mineral leases. The cases presenting the most striking examples are National Wildlife Federation v. Burford, Connor v. Burford, Sierra Club V. Watt, and Bob Marshall Alliance v. Watt. From the claimants' and lessees' point of view, these decisions granted environmental groups sweeping, though somewhat ill-defined, relief. The challenges by environmental groups are based on statutes designed to bring environmental considerations before federal decision makers. The claimants and lessees are caught in the middle of the exchange between environmentalists and federal agencies. Lawsuits that indirectly challenge leases and claims are unlike environmental challenges to fixed projects such as highways or dams. Those affected often times do not know exactly what is at stake. When the challenge is indirect, unexplored, or partially explored, proper ties have only speculative value and the claimants and lessees are often unwilling or unable to engage in a fight with well-heeled environmental public interest law firms. While the federal government has defended the suits, their interests and those of the claimants and lessees may diverge. In the context of the four cases mentioned above, this paper addresses the rights and remedies of claimants and lessees before, during, and after environmental procedural suits that indirectly challenge federal mining claims and mineral leases.

  13. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    SciTech Connect (OSTI)

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  14. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of ...

  15. EIS-0203: Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs

    Broader source: Energy.gov [DOE]

    This EIS considers programmatic (DOE-wide) alternative approaches to safely, efficiently, and responsibly manage existing and projected quantities of spent nuclear fuel until the year 2035. This amount of time may be required to make and implement a decision on the ultimate disposition of spent nuclear fuel. DOE's spent nuclear fuel responsibilities include fuel generated by DOE production, research, and development reactors; naval reactors; university and foreign research reactors; domestic non-DOE reactors such as those at the National Institute of Standards and Technology and the Armed Forces Radiobiology Research Institute; and special-case commercial reactors such as Fort St. Vrain and the Lynchburg Technology Center.

  16. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    SciTech Connect (OSTI)

    Jackson, G.D.

    1987-10-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal.

  17. The Historically Black Colleges and Universities/Minority Institutions Environmental Technology and Waste Management Consortium annual report, 1990--1991

    SciTech Connect (OSTI)

    1991-12-31

    The HBCU/MI Environmental Technology and Waste Management Consortium was established in January 1990, through a Memorandum of Understanding (MOU) among the member institutions. This group of research-oriented Historically Black Colleges and Universities and Minority Institutions (HBCU/MI) agreed to work together to initiate research, technology development and education programs to address the nation`s critical environmental problems. As a group the HBCU/MI Consortium is uniquely positioned to reach women and the minority populations of African Americans, Hispanics and American Indians. As part of their initial work, they developed the Research, Education, and Technology Transfer (RETT) Plan to actualize the Consortium`s guiding principles. In addition to developing a comprehensive research agenda, four major programs were begun to meet these goals. This report summarizes the 1990--1991 progress.

  18. Implementation of a laboratory information management system for environmental regulatory analyses

    SciTech Connect (OSTI)

    Spencer, W.A.; Aiken, H.B.; Spatz, T.L.; Miles, W.F.; Griffin, J.C.

    1993-09-07

    The Savannah River Technology Center created a second instance of its ORACLE based PEN LIMS to support site Environmental Restoration projects. The first instance of the database had been optimized for R&D support and did not implement rigorous sample tracking, verification, and holding times needed to support regulatory commitments. Much of the R&D instance was transferable such as the work control functions for backlog reports, work assignment sheets, and hazard communication support. A major enhancement of the regulatory LIMS was the addition of features to support a {open_quotes}standardized{close_quotes} electronic data format for environmental data reporting. The electronic format, called {open_quotes}AN92{close_quotes}, was developed by the site environmental monitoring organization and applies to both onsite and offsite environmental analytical contracts. This format incorporates EPA CLP data validation codes as well as details holding time and analytical result reporting requirements. The authors support this format by using special SQL queries to the database. The data is then automatically transferred to the environmental databases for trending and geological mapping.

  19. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 TC & WM EIS Proposed Actions (1) Retrieve, treat, and dispose of waste in single-shell tank (SST) and double-shell tank (DST) farms and close the SST system. (2) Decommission the Fast Flux Test Facility, manage the resulting waste, and manage the disposition of the Hanford Site's (Hanford's) inventory of bulk sodium. (3) Manage waste from tank closure and other Hanford activities, as well as limited volumes received from U.S. Department of Energy sites. CHAPTER 2 PROPOSED ACTIONS AND

  20. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

    SciTech Connect (OSTI)

    Not Available

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.