National Library of Energy BETA

Sample records for arra spreadsheet ground

  1. Case study for ARRA-funded ground-source heat pump (GSHP) demonstration at Oakland University

    SciTech Connect (OSTI)

    Im, Piljae; Liu, Xiaobing

    2015-09-01

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights the findings of a case study of one of the ARRA-funded GSHP demonstration projects, a ground-source variable refrigerant flow (GS-VRF) system installed at the Human Health Building at Oakland University in Rochester, Michigan. This case study is based on the analysis of measured performance data, maintenance records, construction costs, and simulations of the energy consumption of conventional central heating, ventilation, and air-conditioning (HVAC) systems providing the same level of space conditioning as the demonstrated GS-VRF system. The evaluated performance metrics include the energy efficiency of the heat pump equipment and the overall GS-VRF system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of the GS-VRF system compared with conventional HVAC systems. This case study also identified opportunities for reducing uncertainties in the performance evaluation, improving the operational efficiency, and reducing the installed cost of similar GSHP systems in the future.

  2. GTP ARRA Spreadsheet | Open Energy Information

    Open Energy Info (EERE)

    and Elemental Analysis At Colrado Area (DOE GTP) Compound and Elemental Analysis At Fish Lake Valley Area (DOE GTP) Compound and Elemental Analysis At Flint Geothermal Area...

  3. Case Study for the ARRA-funded Ground Source Heat Pump Demonstration at Denver Museum of Nature & Science

    SciTech Connect (OSTI)

    Im, Piljae; Liu, Xiaobing

    2015-11-30

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects were competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one such GSHP demonstration projects that uses a recycled water heat pump (RWHP) system installed at the Denver Museum of Nature & Science in Denver, Colorado. The RWHP system uses recycled water from the city’s water system as the heat sink and source for a modular water-to-water heat pump (WWHP). This case study was conducted based on the available measured performance data from December 2014 through August 2015, utility bills of the building in 2014 and 2015, construction drawings, maintenance records, personal communications, and construction costs. The annual energy consumption of the RWHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional VAV system using a water-cooled chiller and a natural gas fired boiler, both of which have the minimum energy efficiencies allowed by ASHRAE 90.1-2010. The comparison was made to determine energy savings, operating cost savings, and CO2 emission reductions achieved by the RWHP system. A cost analysis was performed to evaluate the simple payback of the RWHP system. Summarized below are the results of the performance analysis, the learned lessons, and recommended improvement in the operation of the RWHP system.

  4. Crump's Hot Springs Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    Survey GTP ARRA Spreadsheet Ground Magnetics At Crump's Hot Springs Area (DOE GTP) Ground Magnetics GTP ARRA Spreadsheet Reflection Survey At Crump's Hot Springs Area (DOE...

  5. Building America Analysis Spreadsheets

    Broader source: Energy.gov [DOE]

    The Building America Analysis Spreadsheets are companions to the House Simulation Protocols, and can assist with many of the calculations and look-up tables found in the report. The spreadsheets...

  6. Category:Geothermal ARRA Funded Projects Properties | Open Energy...

    Open Energy Info (EERE)

    Geothermal ARRA Funded Projects Properties Jump to: navigation, search Properties used in the Geothermal ARRA Funded template. Pages in category "Geothermal ARRA Funded Projects...

  7. Hanford ARRA News - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act of 2009 Hanford ARRA News Recovery Act of 2009 Hanford ARRA News Hanford ARRA News Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2010 July 26, 2010 K East Reactor Stack Taken Down (PDF) DOE and contractor CH2M HILL Plateau Remediation Company used Recovery Act funding to take down the stack of the K East Reactor using explosives on July 23, 2010. July 21, 2010 Helicopter Removes Aging Truck From Steep Rattlesnake Ravine (PDF) A Sikorsky S-64

  8. IRP Budget Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IRP Budget Spreadsheet IRP Budget Spreadsheet Blank budget spreadsheet for the Intergrated Research Project. IRPBudgetspreadsheet021711.xls (61.5 KB) More Documents & ...

  9. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet File Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template ...

  10. Managing Financing Programs- Spreadsheet Models

    Broader source: Energy.gov [DOE]

    This webinar, held on Jan. 24, 2011, provides a tutorial for managing financing programs through excel spreadsheets.

  11. ARRA Projects Chart | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Chart ARRA Projects Chart A chart stating the grantee, DOE grant amount,non federal cost share,project lead organization,description,and partners. ARRA Projects Chart (69.68 KB) More Documents & Publications ARRA Project Info Combined 0112110.xls Missouri Recovery Act State Memo The Promise and Challenge of Algae as Renewable Sources of Biofuels

  12. LADTAPXL Aqueous Dose Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    1999-08-10

    LADTAPXL is an EXCEL spreadsheet model of the NRC computer code LADTAP. LADTAPXL calculates maximally exposed individual and population doses from chronic liquid releases. Environmental pathways include external exposure resulting from recreational activities on the Savannah River and ingestion of water, fish, and invertebrates of Savannah River origin.

  13. Hot Oiling Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    1993-10-22

    One of the most common oil-field treatments is hot oiling to remove paraffin from wells. Even though the practice is common, the thermal effectiveness of the process is not commonly understood. In order for producers to easily understand the thermodynamics of hot oiling, a simple tool is needed for estimating downhole temperatures. Such a tool has been developed that can be distributed as a compiled spreadsheet.

  14. ASHRAE Standard 152 Spreadsheet

    Broader source: Energy.gov [DOE]

    ASHRAE Standard 152 quantifies the delivery efficiency of duct systems, based on factors including location, leakage, and insulation of ductwork. This spreadsheet tool developed by Lawrence Berkeley National Laboratory (LBNL) and modified by the National Renewable Energy Laboratory, assists with the calculation of seasonal distribution system efficiency, This calculation is required by the House Simulation Protocols when the simulation tool being used does not permit detailed duct modeling.

  15. Property:GeothermalArraAwardeeCostShare | Open Energy Information

    Open Energy Info (EERE)

    GeothermalArraAwardeeCostShare Property Type Number Description Geothermal ARRA Awardee Cost Share Pages using the property "GeothermalArraAwardeeCostShare" Showing 25 pages using...

  16. Dose Calculation Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    1997-06-10

    VENTSAR XL is an EXCEL Spreadsheet that can be used to calculate downwind doses as a result of a hypothetical atmospheric release. Both building effects and plume rise may be considered. VENTSAR XL will run using any version of Microsoft EXCEL version 4.0 or later. Macros (the programming language of EXCEL) was used to automate the calculations. The user enters a minimal amount of input and the code calculates the resulting concentrations and doses atmore » various downwind distances as specified by the user.« less

  17. Value of Information spreadsheet

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Trainor-Guitton, Whitney

    2014-05-12

    This spreadsheet represents the information posteriors derived from synthetic data of magnetotellurics (MT). These were used to calculate value of information of MT for geothermal exploration. Information posteriors describe how well MT was able to locate the "throat" of clay caps, which are indicative of hidden geothermal resources. This data is full explained in the peer-reviewed publication: Trainor-Guitton, W., Hoversten, G. M., Ramirez, A., Roberts, J., Jlusson, E., Key, K., Mellors, R. (Sept-Oct. 2014) The value of spatial information for determining well placement: a geothermal example, Geophysics.

  18. Value of Information spreadsheet

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Trainor-Guitton, Whitney

    2014-05-12

    This spreadsheet represents the information posteriors derived from synthetic data of magnetotellurics (MT). These were used to calculate value of information of MT for geothermal exploration. Information posteriors describe how well MT was able to locate the "throat" of clay caps, which are indicative of hidden geothermal resources. This data is full explained in the peer-reviewed publication: Trainor-Guitton, W., Hoversten, G. M., Ramirez, A., Roberts, J., Júlíusson, E., Key, K., Mellors, R. (Sept-Oct. 2014) The value of spatial information for determining well placement: a geothermal example, Geophysics.

  19. Energy Advising Services in the Post-ARRA World | Department...

    Energy Savers [EERE]

    Advising Services in the Post-ARRA World Energy Advising Services in the Post-ARRA World Better Buildings Residential Network Workforce Business Partners Peer Exchange Call: ...

  20. Section 1512 Reporting Requirements under ARRA | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements under ARRA More Documents & Publications Appendix B Section 1605 Buy American Provision under ARRA Intelligence Reform and Terrorism Prevention Act - December 17, 2004

  1. EAC Recommendations on Grid Modernization: ARRA Accomplishments...

    Energy Savers [EERE]

    This report, approved at the September 2015 EAC meeting, is a retrospective assessment of ... Act (ARRA) in encouraging the industry to take a substantial technical step forward. ...

  2. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 1 2012 Composite Data Products - Deployment (Presentation)

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

    2012-06-01

    This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). Quarter 1 2012 Composite Data Products - Deployment March 8, 2012.

  3. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); November 2011 Composite Data Products - Deployment (Presentation)

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

    2012-06-01

    This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). November 2011 Composite Data Products - Deployment November 30, 2011.

  4. Section 1605 Buy American Provision under ARRA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    605 Buy American Provision under ARRA Section 1605 Buy American Provision under ARRA Additional information on the Buy American Provision under ARRA. Section 1605 Buy American Provision under ARRA (9.71 KB) More Documents & Publications Nationwide Limited Public Interest Waiver for LED and HVAC Units Questions and Answers for the Smart Grid Investment Grant Program: Buy American Buy American Guidance Documents

  5. Excel spreadsheet discussed in Report Appendix

    Broader source: Energy.gov [DOE]

    The functional spreadsheet which accompanies the Accounting for Uncertainty in Lumen Measurements report.

  6. ARM - Field Campaign - ARRA AERI Comparison

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsARRA AERI Comparison ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : ARRA AERI Comparison 2011.01.07 - 2011.01.23 Lead Scientist : David Turner For data sets, see below. Abstract The ARM program, using stimulus funds from the ARRA, acquired a new AERI instrument for the SGP site. This new instrument was run side-by-side with the operational AERI at the SGP central facility to evaluate its

  7. Appendix A-1 Contract Performance Reports ARRA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A-1 Contract Performance Reports ARRA December 2011 CHPRC-2011-12, Rev. 0 Contract DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 Format 1 - Work Breakdown Structure Format 3 -...

  8. IRC Budget Proposal spreadsheet example | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IRC Budget Proposal spreadsheet example IRC Budget Proposal spreadsheet example An example budget proposal for NEUP Integrated Research Project. Example Budget spreadsheet ...

  9. ARRA521 Recovery Act - Project Daily Report

    Office of Environmental Management (EM)

    Energy ARRA Grid Modernization Investment Highlights - Fact Sheet ARRA Grid Modernization Investment Highlights - Fact Sheet The power grid of the future is a platform that delivers reliable, affordable, and clean electricity to American consumers where they want it, when they want it, and how they want it. To jump start the modernization of our nation's aging energy infrastructure, the American Recovery and Reinvestment Act of 2009 invested $4.5 billion in the electric sector - matched by

  10. 2009 ARRA Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 ARRA Newsletters 2009 ARRA Newsletters American Recovery & Reinvestment Act Newsletter - Issue 8 (2.95 MB) American Recovery & Reinvestment Act Newsletter - Issue 7 (865.96 KB) American Recovery & Reinvestment Act Newsletter - Issue 6 (3.6 MB) American Recovery & Reinvestment Act Newsletter - Issue 5 (1.04 MB) American Recovery & Reinvestment Act Newsletter - Issue 4 (9.28 MB) American Recovery & Reinvestment Act Newsletter - Issue 3 (893.08 KB) American Recovery &

  11. 2010 ARRA Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 ARRA Newsletters 2010 ARRA Newsletters American Recovery & Reinvestment Act Newsletter - Issue 19 (6.83 MB) American Recovery & Reinvestment Act Newsletter - Issue 18 (6.2 MB) American Recovery & Reinvestment Act Newsletter - Issue 17 (7.14 MB) American Recovery & Reinvestment Act Newsletter - Issue 16 (7.14 MB) American Recovery & Reinvestment Act Newsletter - Issue 15 (7.41 MB) American Recovery & Reinvestment Act Newsletter - Issue 14 (7.49 MB) American Recovery

  12. 2011 ARRA Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 ARRA Newsletters 2011 ARRA Newsletters American Recovery & Reinvestment Act Newsletter - Issue 29 (12.89 MB) American Recovery & Reinvestment Act Newsletter - Issue 28 (8.68 MB) American Recovery & Reinvestment Act Newsletter - Issue 27 (7.42 MB) American Recovery & Reinvestment Act Newsletter - Issue 26 (8.58 MB) American Recovery & Reinvestment Act Newsletter - Issue 25 (6.84 MB) American Recovery & Reinvestment Act Newsletter - Issue 24 (7.37 MB) American Recovery

  13. Energy Storage R&D and ARRA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Storage R&D and ARRA Energy Storage R&D and ARRA 2010 DOE Vehicle ... More Documents & Publications Hybrid Electric Systems Overview of Battery R&D Activities Overview of ...

  14. Title XVII-Innovative Technology Loan Guarantee Program under ARRA |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy XVII-Innovative Technology Loan Guarantee Program under ARRA Title XVII-Innovative Technology Loan Guarantee Program under ARRA Additional information on Title XVII-Innovative Technology Loan Guarantee Program under ARRA. Title XVII-Innovative Technology Loan Guarantee Program under ARRA (8.48 KB) More Documents & Publications Z:\ENROLL\H1.ENR Statement Before the Senate Energy and Natural Resources Committee American Recovery and Reinvestment Act of 2009

  15. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA): Quarter 4 2013 Composite Data Products

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.

    2014-06-01

    This report includes the composite data products (CDPs) for early fuel cell market deployments in quarter 4 of 2013. Results are presented for ARRA (projects funded by the American Recovery and Reinvestment Act of 2009 [ARRA]) and Combined (projects funded by DOE Interagency Agreements [IAA], Department of Defense Defense Logistics Agency [DLA], and ARRA).

  16. ARRA Project Info Combined 0112110.xls | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications ARRA Projects Chart Missouri Recovery Act State Memo Texas Hydrogen Highway - Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase...

  17. First ARRA-Funded Demolition at Y-12 Begins

    Broader source: Energy.gov [DOE]

    Y-12 began its first ARRA-funded demolition project, Building 9735. The facility was built in 1946 as an engineering laboratory.

  18. ARRA Home Improvement Funds Application for Canton, Michigan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home Improvement Funds Application for Canton, Michigan ARRA Home Improvement Funds Application for Canton, Michigan Federal Energy Regulatory Commission Loan Program Limited ...

  19. Energy Advising Services in the Post-ARRA World

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Workforce / Business Partners Peer Exchange Call: Energy Advising Services in the Post-ARRA World, Call Slides and Summary, June 27, 2013. This peer exchange call discussed energy advising services in the post­-ARRA world.

  20. January 2012 ARRA Energy Assurance Planning Bulletin Available

    Broader source: Energy.gov [DOE]

    The Department released the January 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the ninth issue of the EAP Bulletin; previous issues are available for download.

  1. July 2012 ARRA Energy Assurance Planning Bulletin Available

    Broader source: Energy.gov [DOE]

    The Department released the July 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the eleventh issue of the EAP Bulletin; previous issues are available for download.

  2. April 2012 ARRA Energy Assurance Planning Bulletin Available

    Broader source: Energy.gov [DOE]

    The Department released the April 2012 issue of the ARRA Energy Assurance Planning Bulletin (EAPB). The ARRA EAPB is issued quarterly to provide information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. This is the tenth issue of the EAP Bulletin; previous issues are available for download.

  3. Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 3 2012 Composite Data Products

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.; Post, M.

    2013-01-01

    This report from the U.S. Department of Energy's National Renewable Energy Laboratory includes early fuel cell market composite data products for the third quarter of 2012 for American Recovery and Reinvestment Act (ARRA) and combined (IAA, DLA, ARRA) deployment projects.

  4. Managing Financing Programs-- Spreadsheet Models (Text Version)

    Broader source: Energy.gov [DOE]

    Chris: - financial market development team. I'm really glad that all of you have been able to take time out of your busy days to come and share some time with us talking about using spreadsheet...

  5. Consortium Participant List - Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consortium Participant List - Spreadsheet Consortium Participant List - Spreadsheet Membership in the Consortium is open to municipalities, utilities, and energy efficiency organizations, with participation at various levels from other interested parties. consortium-participant-list.xlsx (29.14 KB) More Documents & Publications Fuel Cell Power Plants Biofuel Case Study - Tulare, CA Microsoft Word - DE-FOA-0000013 Amendment 000003.doc Funding Opportunity Announcement: Recovery Act … Energy

  6. Report on all ARRA Funded Technical Work

    SciTech Connect (OSTI)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. This project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.

  7. Data Analysis for ARRA Early Fuel Cell Market Demonstrations (Presentation)

    SciTech Connect (OSTI)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.

    2010-05-01

    Presentation about ARRA Early Fuel Cell Market Demonstrations, including an overview of the ARRE Fuel Cell Project, the National Renewable Energy Laboratory's data analysis objectives, deployment composite data products, and planned analyses.

  8. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, April 1 2010, Volume 1 No. 2 | Department of Energy April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2010, Volume 1 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 2. For more information about

  9. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, April 2, 2012, Volume 3 No. 2 | Department of Energy April 2, 2012, Volume 3 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 2, 2012, Volume 3 No. 2 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 2. For more information

  10. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, January 3 2012, Volume 3 No. 1 | Department of Energy 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 1. For more information about

  11. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, January 4, 2010, Volume 1 No. 1 | Department of Energy 4, 2010, Volume 1 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 4, 2010, Volume 1 No. 1 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 1. For more information

  12. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, July 1 2010, Volume 1 No. 3 | Department of Energy 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2010, Volume 1 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 3. For more information about how OE

  13. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, July 9, 2012, Volume 3 No. 3 | Department of Energy 9, 2012, Volume 3 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 9, 2012, Volume 3 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 3. For more information about how

  14. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, October 1 2010, Volume 1, No. 4 | Department of Energy October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1 2010, Volume 1, No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 1, NUMBER 4. For more

  15. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 | Department of Energy October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 1, 2012, Volume 3 No. 4 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and important grant deliverable dates. VOLUME 3, NUMBER 4. For more

  16. SEP/ARRA Evaluation Webinar | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARRA Evaluation Webinar SEP/ARRA Evaluation Webinar This PowerPoint template for EERE Corporate provides an introduction-style slide background and a follow-on slide background for corporate presentations. evaluation_webinar_slides_june16_2010.pdf (246.83 KB) More Documents & Publications Guidance on Basic Best Practices in Management of Energy Performance Buildings DOE Recovery Act Reporting Requirements for the State Energy Program Developing an Evaluation Measurement, and Verification

  17. Recovery Act Monthly Reporting Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Monthly Reporting Spreadsheet Recovery Act Monthly Reporting Spreadsheet Monthly Update Report Data Recovery Act Monthly Reporting Spreadsheet (84.9 KB) More Documents & Publications Audit Letter Report: OAS-RA-L-10-01 Audit Report: OAS-RA-L-12-02 Audit Special Report: OAS-RA-10-0

  18. FY 2014 Funding History Detail Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget » FY 2014 Budget Justification » FY 2014 Funding History Detail Spreadsheet FY 2014 Funding History Detail Spreadsheet FY 2014 Funding History Detail Spreadsheet (3.5 MB) (3.39 MB) More Documents & Publications CONSUMER CLOTHES WASHERS (APPENDIX J2) Direct Heating Equipment- v2.0 consumer Clothes Washers (Appendix J2)

  19. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY ...

  20. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 2 (Day 2): ARRA Projects

    Broader source: Energy.gov [DOE]

    Day 2 poster session presentations (ARRA projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  1. Guidebook for ARRA Smart Grid Program Metrics and Benefits | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidebook for ARRA Smart Grid Program Metrics and Benefits Guidebook for ARRA Smart Grid Program Metrics and Benefits The Guidebook for American Recovery and Reinvestment Act (ARRA) Smart Grid Program Metrics and Benefits describes the type of information to be collected from each of the Project Teams and how it will be used by the Department of Energy to communicate overall conclusions to the public. Guidebook for ARRA Smart Grid Program Metrics and Benefits (975.03 KB) More

  2. EM ARRA Best Practices and Lessons Learned Workshop: Oak Ridge

    Office of Environmental Management (EM)

    Learned Oak Ridge Presenter: Sue Cange EM ARRA BEST PRACTICES and LESSONS LEARNED WORKSHOP Waste Management Symposium Phoenix, AZ www.em.doe.gov 1 March 1, 2012 Oak Ridge Overview of Best Practice or Opportunity pp y Working closely together, the Y-12 Site M&O Contractor, the ORO Reservation disposal cell, DOE-EM, and the Regulators crafted a technically defensible, yet very cost effective characterization program in an effort to rapidly D&D two buildings that were part of the Y-12 ARRA

  3. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  4. Case Study for the ARRA-funded GSHP Demonstration at University at Albany

    SciTech Connect (OSTI)

    Liu, Xiaobing; Malhotra, Mini; Xiong, Zeyu

    2015-03-01

    High initial costs and lack of public awareness of ground-source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy-saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This report highlights the findings of a case study of one of the ARRA-funded GSHP demonstration projects—a distributed GSHP system at a new 500-bed apartment-style student residence hall at the University at Albany. This case study is based on the analysis of detailed design documents, measured performance data, published catalog data of heat pump equipment, and actual construction costs. Simulations with a calibrated computer model are performed for both the demonstrated GSHP system and a baseline heating, ventilation, and airconditioning (HVAC) system to determine the energy savings and other related benefits achieved by the GSHP system. The evaluated performance metrics include the energy efficiency of the heat pump equipment and the overall GSHP system, as well as the pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of the demonstrated GSHP system compared with the baseline HVAC system. This case study also identifies opportunities for improving the operational efficiency of the demonstrated GSHP system.

  5. Argonne Director Eric Isaacs talks about ARRA funding at Argonne

    ScienceCinema (OSTI)

    Isaacs, Eric

    2013-04-19

    Argonne is set to receive over $150 million in stimulus funds. Director Eric Isaacs describes how these funds will be put to good use?hiring employees and contractors, cleaning up the nuclear footprint, and investing in technologies for America's future. More info on Argonne and ARRA here: http://www.anl.gov/recovery/index.html

  6. Open Source Impacts of REDD Incentives Spreadsheet (OSIRIS) ...

    Open Energy Info (EERE)

    platform is recognizable to - and can be downloaded by - almost everyone. It's a Microsoft Excel spreadsheet. A user can define any of the values used to calculate REDD...

  7. Cost of Renewable Energy Spreadsheet Tool (CREST) | Open Energy...

    Open Energy Info (EERE)

    cleanenergysolutions.orgcontentcost-renewable-energy-spreadsheet-too Language: English Policies: Regulations Regulations: Feed-in Tariffs Assess projects, design cost-based...

  8. POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Positions (Expired) | Department of Energy 02 Using Schedule A Hiring Authority for ARRA Positions (Expired) POLICY GUIDANCE MEMORANDUM #02 Using Schedule A Hiring Authority for ARRA Positions (Expired) THIS GUIDANCE HAS EXPIRED OPM is authorizing the use of excepted service appointments under Title 5 CFR 213.31 02 (i) (3) to address the needs of agencies to hire additional staff in support of the American Recovery and Reinvestment Act of 2009 (ARRA) The Schedule A authority under 5 CFR 21

  9. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY...

    Energy Savers [EERE]

    BLOCK GRANT (EECBG) PROGRAM PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) ...

  10. Track 8: Safety of Work Created Under the American Recovery and Reinvestment Act (ARRA)

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 8: Safety of Work Created Under the American Recovery and Reinvestment Act (ARRA)

  11. Progress of DOE Materials, Manufacturing Process R&D, and ARRA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress of DOE Materials, Manufacturing Process R&D, and ARRA Battery Manufacturing Grants 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit ...

  12. Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program...

    Broader source: Energy.gov (indexed) [DOE]

    DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM ...

  13. Progress of DOE Materials, Manufacturing Process R&D, and ARRA...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Progress of DOE Materials, Manufacturing Process R&D, and ARRA Battery Manufacturing Grants Vehicle Technologies Office: 2010 Energy Storage R&D ...

  14. ORISE: ARRA-funded work creates opportunities for Tennessee-based...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    buildings and in the process, has expanded his knowledge of the tools and techniques used when sampling structural components. How ARRA-work helped Kevin "With this ORNL...

  15. AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Charging Infrastructure Data Summary Reports AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and

  16. AVTA: ARRA EV Project Residential Charging Infrastructure Maps | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Residential Charging Infrastructure Maps AVTA: ARRA EV Project Residential Charging Infrastructure Maps The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported

  17. ORISE: Supporting ARRA funded cleanup activities in Oak Ridge, Tenn.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORISE supporting Oak Ridge reservation cleanup activities through recovery funding ORISE technician performs an environmental scan Disposing of old and contaminated buildings, and remediating soil and groundwater across the Oak Ridge Reservation has long been a priority for the U.S. Department of Energy (DOE)-Oak Ridge Office (ORO). Though much of the work wasn't expected to begin for another three to four years, the acquisition of $755 million in American Recovery and Reinvestment Act (ARRA)

  18. Examples of Benefits from the NEPA process for ARRA funded activities

    Office of Energy Efficiency and Renewable Energy (EERE)

    Efforts to implement the American Recovery and Reinvestment Act of 2009 (ARRA) include ensuring, and reporting on, timely NEPA reviews prepared in support of projects and activities funded under major provisions of ARRA. In addition to reporting on the status of the NEPA environmental reviews, agencies also report on the benefits of NEPA.

  19. TOTAL ARRA Homes Weatherized thru Q2 2010 8.19.10.xls | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy TOTAL ARRA Homes Weatherized thru Q2 2010 8.19.10.xls (14.26 KB) More Documents & Publications U.S. Department of Energy Weatherization Assistance Program Homes Weatherized By State through 06/30/2010 (Calendar Year) Homes Weatherized by State March 2010 ARRA Homes Weatherized by Grantee

  20. TOTAL_ARRA_Homes_Weatherized_thru_Q3_2010_11_9_10.pdf | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy (73.65 KB) More Documents & Publications TOTAL_ARRA_Homes_Weatherized_thru_Q4_2010_3.7.11.pdf ARRA_Homes_Weatherized_by_State_for_February_4.14.11.pdf Homes_Weatherized_State_July_10.15.10.pdf

  1. 2009-04 "Priorities for ARRA Stimulus Funding for Environmental Clean-up at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LANL" | Department of Energy 4 "Priorities for ARRA Stimulus Funding for Environmental Clean-up at LANL" 2009-04 "Priorities for ARRA Stimulus Funding for Environmental Clean-up at LANL" The intent of this recommendation is to encourage LASO and the DOE Office of Environmental Management to shoe immediate and beneficial acceleration of the clean-up of legacy waste at LANL and to encourage additional ARRA funding be provided for the use at LANL. Further, the intent of

  2. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

    SciTech Connect (OSTI)

    Boyd, Brian K.; Gorrissen, Willy J.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Williamson, Jennifer L.; Nesse, Ronald J.

    2010-09-30

    This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

  3. ARRA_Homes_Weatherized_by_State_for_January_4.14.11.pdf | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy 98 KB) More Documents & Publications ARRA_Homes_Weatherized_by_State_for_February_4.14.11.pdf Homes_Weatherized_by_State_for_November_1.18.10.pdf Homes Weatherized by State April 2010

  4. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2013

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Peters, M.

    2014-06-01

    This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the fourth quarter of 2013.

  5. ARRA Material Handling Equipment Composite Data Products: Data Through Quarter 4 of 2012

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.; Ramsden, T.

    2013-05-01

    This presentation from the U.S. Department of Energy's National Renewable Energy Laboratory includes American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment composite data products for data through the fourth quarter of 2012.

  6. MEDIA ADVISORY: DOE Open House to Focus on Programmatic Successes Achieved Under ARRA Funding

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Idaho Operations Office will hold an open house on Monday, Nov. 14 to highlight the cleanup and energy accomplishments made with American Recovery and Reinvestment Act (ARRA) funding.

  7. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM...

    Broader source: Energy.gov (indexed) [DOE]

    STATE ENERGY PROGRAM PROGRAM NOTICE 10-010 EFFECTIVE DATE: May 6, 2010 SUBJECT: DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM PROJECTS INVOLVING RESIDENTIAL ...

  8. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 2 of 2013

    SciTech Connect (OSTI)

    Kurtz, J.; Sprik, S.; Ainscough, C.; Saur, G.; Post, M.; Peters, M.

    2013-11-01

    This report includes 47 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the second quarter of 2013.

  9. WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy : ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the

  10. WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the

  11. Medium Duty ARRA Data Reporting and Analysis (Presentation)

    SciTech Connect (OSTI)

    Walkowicz, K.

    2014-06-01

    This project compiles medium-duty (MD) aggregated deployment data and provides the compiled detailed analyses to industry. The U.S. Department of Energy's (DOE's) American Recovery and Reinvestment Act (ARRA) deployment and demonstration projects are helping to commercialize technologies for all-electric vehicles, electrified accessories, and electric charging infrastructure. Over 3.2 million miles of in-service all-electric MD truck data from 560 different vehicles have been collected since 2011, and usage data from over 1,000 truck electrification sites have been collected since 2013. Through the DOE's Vehicle Technologies Office, NREL is working to analyze real-time data from these deployment and demonstration projects to quantify the benefits: results and summary statistics are made available through the NREL website as quarterly and annual reports; 23 aggregated reports have been published on the performance and operation of these vehicles; and detailed data are being extracted to help further understand battery use and performance.

  12. Environmental Emissions Nonenergy Benefits Working Paper: ARRA Period

    SciTech Connect (OSTI)

    Carroll, David; Bausch, Daniel

    2015-03-01

    Weatherization reduces energy usage by low-income households, and thereby reduces the environmental impacts of the production and consumption of energy and reduces the social costs associated with those environmental impacts. The nonenergy benefits study conducted as part of the American Recovery and Reinvestment Act of 2009 (ARRA) Weatherization Assistance Program (WAP) evaluation focused on measuring the emissions reductions resulting from WAP program energy usage reductions and estimating the societal value of those emission reductions. While there are other environmental impacts associated with the WAP program, this study focused on emissions impacts because the 2010 National Research Council (NRC) report Hidden Costs of Energy: The Unpriced Consequences of Energy Production and Use recommended that Congress focus on emissions costs because they have the highest documented social impact costs

  13. Questions below are regarding the spreadsheet EERE-2014-BT-STD-0031-002 unless o

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    below are regarding the spreadsheet EERE-2014-BT-STD-0031-002 unless otherwise noted. 1) The 2011 LCC spreadsheet predicted lower LCC savings, especially for replacements in the south region and for the highest efficiency (98%) condensing furnace cases, compared to the 2014 LCC spreadsheet even though the 2011 LCC spreadsheet did not include the potential of fuel switching. a) What are the major reasons for the significant changes in LCC savings? b) Why do consumer impacts for replacements in

  14. When Spreadsheets Become Software - Quality Control Challenges and Approaches - 13360

    SciTech Connect (OSTI)

    Fountain, Stefanie A.; Chen, Emmie G.; Beech, John F.; Wyatt, Elizabeth E.; Quinn, Tanya B.; Seifert, Robert W.

    2013-07-01

    As part of a preliminary waste acceptance criteria (PWAC) development, several commercial models were employed, including the Hydrologic Evaluation of Landfill Performance model (HELP) [1], the Disposal Unit Source Term - Multiple Species model (DUSTMS) [2], and the Analytical Transient One, Two, and Three-Dimensional model (AT123D) [3]. The results of these models were post-processed in MS Excel spreadsheets to convert the model results to alternate units, compare the groundwater concentrations to the groundwater concentration thresholds, and then to adjust the waste contaminant masses (based on average concentration over the waste volume) as needed in an attempt to achieve groundwater concentrations at the limiting point of assessment that would meet the compliance concentrations while maximizing the potential use of the landfill (i.e., maximizing the volume of projected waste being generated that could be placed in the landfill). During the course of the PWAC calculation development, one of the Microsoft (MS) Excel spreadsheets used to post-process the results of the commercial model packages grew to include more than 575,000 formulas across 18 worksheets. This spreadsheet was used to assess six base scenarios as well as nine uncertainty/sensitivity scenarios. The complexity of the spreadsheet resulted in the need for a rigorous quality control (QC) procedure to verify data entry and confirm the accuracy of formulas. (authors)

  15. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2011, Volume 2 No. 1

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  16. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  17. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, April 1 2011, Volume 2 No. 2

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  18. The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, October 3 2011, Volume 2 No. 4

    Broader source: Energy.gov [DOE]

    The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin provides information on energy assurance planning resources, upcoming events, training opportunities, and...

  19. Data Analysis from Ground Source Heat Pump Demonstration Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lead Performer: Oak Ridge National Laboratory - Oak Ridge, TN Partners: -- CDH Energy - Cazenovia, NY -- University of Tennessee - Knoxville, TN -- Cedarville Schools - Cedarville, AR (ARRA grantee) -- Flathead Electric Cooperative - Kalispell, MT (ARRA grantee) -- University at Albany - Albany, NY (ARRA grantee) -- City of Raleigh, NC (ARRA grantee) -- Montana Tech (ARRA grantee) -- Oakland University - Rochester, MI (ARRA grantee)

  20. Davis-Bacon Act Wage Rates for ARRA-Funded Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Each state's spreadsheet is organized by county and lists the relevant work classifications for a jurisdiction; for example Laborer, Insulator, Carpenter, Electrician, Plumber, ...

  1. NATIONAL EVALUATION OF THE WEATHERIZATION ASSISTANCE PROGRAM DURING THE ARRA PERIOD: PROGRAM YEARS 2009-2011

    SciTech Connect (OSTI)

    Tonn, Bruce Edward; Rose, Erin M; Schmoyer, Richard L; Eisenberg, Joel Fred; Ternes, Mark P; Schweitzer, Martin; Hendrick, Timothy P

    2012-08-01

    This report describes the third major evaluation of the Program, encompassing program years 2009 to 2011. In this report, this period of time is referred to as the ARRA Period. This is a special period of time for the Program because the American Recovery and Reinvestment Act (ARRA) of 2009 has allocated $5 billion of funding for the Program. In normal program years, WAP s annual appropriation is in the range of $200-250 million, supporting the weatherization of approximately 100,000 homes. With the addition of ARRA funding during these program years, the expectation is that weatherization activity will exceed 300,000 homes per year. In addition to saving energy and reducing low-income energy bills, expanded WAP funding is expected to stimulate the economy by providing new jobs in the weatherization field and allowing low-income households to spend more money on goods and services by spending less on energy.

  2. Case Study of The ARRA-Funded GSHP Demonstration at the Natural Sources Building, Montana Tech

    SciTech Connect (OSTI)

    Malhotra, Mini; Liu, Xiaobing

    2015-04-01

    Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use water in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an aircooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally

  3. Geothermal Electricity Technology Evaluation Model (GETEM) Individual Case Files and Summary Spreadsheet (GETEM version Spring 2013)

    SciTech Connect (OSTI)

    Hanson, Steven CJ

    2013-03-07

    This group of files-- 10 GETEM individual case files and 1 summary spreadsheet-- contain final data from the revisions between summer 2011 and spring 2013.

  4. Geothermal Electricity Technology Evaluation Model (GETEM) Individual Case Files and Summary Spreadsheet (GETEM version Spring 2013)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hanson, Steven CJ

    This group of files-- 10 GETEM individual case files and 1 summary spreadsheet-- contain final data from the revisions between summer 2011 and spring 2013.

  5. ARRA_Homes_Weatherized_by_State_for_February_4.14.11.pdf | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy 72 KB) More Documents & Publications ARRA_Homes_Weatherized_by_State_for_January_4.14.11.pdf Homes_Weatherized_State_July_10.15.10.pdf Homes_Weatherized_by_State_for_July_10.13.10.pdf

  6. ARRA Material Handling Equipment Composite Data Products: Data through Quarter 3 of 2014; NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Ainscough, Chris; Kurtz, Jennifer

    2015-05-01

    This document includes 23 composite data products (CDPs) produced for American Recovery and Reinvestment Act (ARRA) fuel cell material handling equipment, with data through the third quarter of 2014.

  7. Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program Projects Involving Residential Weatherization Work

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for Davis-Bacon Act (DBA) covered weatherization work performed under the State Energy Program (SEP) using American Recovery and Reinvestment Act of 2009 (ARRA) funds.

  8. EAC Recommendations on Grid Modernization: ARRA Accomplishments and Recommendations for Moving Forward

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report, approved at the September 2015 EAC meeting, is a retrospective assessment of the value of the American Reinvestment and Recovery Act (ARRA) in encouraging the industry to take a substantial technical step forward. Additionally, it is a prospective look at the future of the smart grid and DOE's role moving forward. Further, this paper sets forth the EAC's recommendations for building on the ARRA smart grid-related accomplishments to continue the Nation's efforts to develop a smarter, more resilient grid. The purpose of this report is to provide input to the 2016 Smart Grid Systems Report that will include recommendations for State and Federal policies and actions that could help facilitate the transition to a smarter grid.

  9. Progress of DOE Materials, Manufacturing Process R&D, and ARRA Battery

    Broader source: Energy.gov (indexed) [DOE]

    Manufacturing Grants | Department of Energy 1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation es098_johnson_2011_o.pdf (1.22 MB) More Documents & Publications Progress of DOE Materials, Manufacturing Process R&D, and ARRA Battery Manufacturing Grants Vehicle Technologies Office: 2010 Energy Storage R&D Annual Progress Report Perfluoro Aryl Boronic Esters as Chemical Shuttle Additives

  10. Synchrophasor Technology Advancement in ARRA Projects: Final Report from the American Recovery and Reinvestment Act Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advancement of Synchrophasor Technology in ARRA Projects │ ii ACKNOWLEDGMENTS This report was sponsored by the U.S. Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) and prepared by the Oak Ridge National Laboratory (ORNL). The effort was directed and supported by DOE Senior Advisor Joseph Paladino and DOE Program Managers Philip N. Overholt and Deborah Haught. The authors of this report were Jose R. Gracia (ORNL), Marcus A. Young, II, Ph.D. (ORNL), D. Tom

  11. More Than 1,000 Fuel Cell Units Deployed Through DOE ARRA Funding (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-07-01

    This NREL Hydrogen and Fuel Cell Technical Highlight describes how early market end users are operating 1,111 fuel cell units at 301 sites in 20 states with funding from the U.S. Department of Energy Fuel Cell Technologies Program and analysis by NREL. The American Recovery and Reinvestment Act (ARRA) funded the deployment of approximately 1,000 fuel cell systems in key early markets to accelerate the commercialization and deployment of fuel cells and fuel cell manufacturing, installation, maintenance, and support services. In support of the ARRA fuel cell deployment objectives, NREL analyzes and validates the technology in real-world applications, reports on the technology status, and facilitates the development of fuel cell technologies, manufacturing, and operations in strategic markets-including material handling equipment, backup power, and stationary power-where fuel cells can compete with conventional technologies. NREL is validating hydrogen and fuel cell systems in real-world settings through data collection, analysis, and reporting. The fuel cell and infrastructure analysis provides an independent, third-party assessment that focuses on fuel cell system and hydrogen infrastructure performance, operation, maintenance, use, and safety. An objective of the ARRA fuel cell project-to deploy approximately 1,000 fuel cell systems in key early markets - has been met in two years. By the end of 2011, 504 material handling equipment (MHE) fuel cell units were operating at 8 facilities and 607 backup power fuel cell units were operating at 293 sites. MHE and backup power are two markets where fuel cells are capable of meeting the operating demands, and deployments can be leveraged to accelerate fuel cell commercialization.

  12. ARRA875D Recovery Act - Recip Reporting Summary by Project Website

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recipient Reporting Summary by Project" "For Quarter Ending December 31, 2010 - ARRA Awards Subject to Section 1512 Reporting" "Total Awarded and Total Outlaid are as of Quarter End." "Data from FR.gov is as of 1/29/2011 9:42:31 PM" "DOE Program Office Name","DOE Project Name","Total Awarded","Total Outlaid","FR.gov Jobs" "Advanced Research Projects Agency - Energy","Advanced Research Projects

  13. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for all Davis-Bacon Act (DBA) covered-work, including weatherization work, performed under the State Energy (SEP) Program using American Recovery and Reinvestment Act of 2009 (ARRA) funds to ensure compliance with DBA requirements.

  14. Better Buildings Residential Network Workforce/Business Partners Peer Exchange Call: Energy Advising Services in the Post-ARRA World Call Slides and Summary, June 27, 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce/Business Partners Peer Exchange Call: Energy Advising Services in the Post-ARRA World Call Slides and Summary Agenda * Call Logistics and Introductions * Introducing the Better Buildings Residential Network * Future Call Topics * Discussion:  What experiences or plans do programs have offering energy advising or energy concierge services without American Recovery and Reinvestment Act (ARRA) grants?  What fees or other funding models are programs exploring for these services

  15. AVTA- ARRA

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following report describes lessons learned about the consumer charging behavior from the EV Project. The EV Project partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. This research was conducted by Idaho National Laboratory.

  16. National Weatherization Assistance Program Characterization - Describing the Pre-ARRA Progam

    SciTech Connect (OSTI)

    Bensch, Ingo; Keene, Ashleigh; Cowan, Claire; Koski, Karen

    2014-09-01

    This report characterizes the Department of Energy s Weatherization Assistance Program (WAP) as it was administered in Program Year 2008. WAP has supported energy efficiency improvements to the homes of low-income households in the United States since 1976. The program provides grants, guidance, and other support to grantees: weatherization programs administered by each of the 50 states, the District of Columbia and some Native American tribes. Although there have been studies of some grantee-administered weatherization programs, the overall effectiveness of the national weatherization program has not been formally evaluated since Program Year 1989. Since that time, the program has evolved significantly, with an increased focus on baseload electric usage, continued evolution of diagnostic tools, new guidelines and best practices for heating-related measures, and adjustments in program rules. More recently, the program has also adjusted to large, temporary funding increases and changes in federal rules spurred by the American Recovery and Reinvestment Act (ARRA). Because the Weatherization Assistance Program of today is dramatically different from the one evaluated in 1989, DOE determined to undertake a new comprehensive evaluation of the national program. This new national evaluation is managed by Oak Ridge National Laboratory (ORNL). Under a competitive solicitation process, ORNL selected APPRISE, Inc., Blasnik & Associates, Dalhoff Associates and the Energy Center of Wisconsin to conduct the evaluation. The national evaluation comprises two independent evaluations. The first evaluation of which this report is a part focuses on Program Year 2008 (PY08). The second evaluation focuses on the ARRA-funded years of 2009 through 2011. This report, together with its companion the Eligible Population Study addresses specific program characterization goals established for the greater evaluation. The Energy Center led grantee and subgrantee data collection efforts

  17. THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

    SciTech Connect (OSTI)

    BLACKFORD LT

    2010-01-19

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  18. Jeff Grounds

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jeff Grounds Jeff Grounds jeffgrounds-sm.jpg Jeff Grounds Facilities Manager JTGrounds@lbl.gov Phone: (510) 486-7197 Mobile: (510) 207-2273 Last edited: 2016-04-29 11:34:57

  19. Ground Magnetic Data for west-central Colorado

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Zehner, Richard

    2012-03-08

    Ground Magnetic Data for west-central Colorado Modeled ground magnetic data was extracted from the Pan American Center for Earth and Environmental Studies database at http://irpsrvgis08.utep.edu/viewers/Flex/GravityMagnetic/GravityMagnetic_CyberShare/ on 2/29/2012. The downloaded text file was then imported into an Excel spreadsheet. This spreadsheet data was converted into an ESRI point shapefile in UTM Zone 13 NAD27 projection, showing location and magnetic field strength in nano-Teslas. This point shapefile was then interpolated to an ESRI grid using an inverse-distance weighting method, using ESRI Spatial Analyst. The grid was used to create a contour map of magnetic field strength. This dataset includes the raw spreadsheet data, an ESRI point shapefile showing magnetic sample locations and magnetic field strength, and an ESRI line shapefile showing magnetic contours. Projection: UTM Zone 13 NAD27 Magnetic Contour Shapefile Extent: West -108.698836 East -105.283977 North 41.048206 South 36.950086 Magnetic Point Shapefile Extent: West -108.698832 East -105.283908 North 41.048142 South 36.950086

  20. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) PROGRAM PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for all Davis-Bacon Act (DBA) covered-work, including weatherization work, performed under the Energy Efficiency and Conservation Block Grants (EECBG) Program using American Recovery and Reinvestment Act of 2009 (ARRA) funds to ensure compliance with DBA requirements.

  1. CalTOX (registered trademark), A multimedia total exposure model spreadsheet user's guide. Version 4.0(Beta)

    SciTech Connect (OSTI)

    McKone, T.E.; Enoch, K.G.

    2002-08-01

    CalTOX has been developed as a set of spreadsheet models and spreadsheet data sets to assist in assessing human exposures from continuous releases to multiple environmental media, i.e. air, soil, and water. It has also been used for waste classification and for setting soil clean-up levels at uncontrolled hazardous wastes sites. The modeling components of CalTOX include a multimedia transport and transformation model, multi-pathway exposure scenario models, and add-ins to quantify and evaluate uncertainty and variability. All parameter values used as inputs to CalTOX are distributions, described in terms of mean values and a coefficient of variation, rather than as point estimates or plausible upper values such as most other models employ. This probabilistic approach allows both sensitivity and uncertainty analyses to be directly incorporated into the model operation. This manual provides CalTOX users with a brief overview of the CalTOX spreadsheet model and provides instructions for using the spreadsheet to make deterministic and probabilistic calculations of source-dose-risk relationships.

  2. Compliance with Section 15 12 Reporting Requirements of the American Recovery and Reinvestment Act of 2009 (ARRA)

    Broader source: Energy.gov [DOE]

    Compliance with the reporting requirements of Section 15 12 is a main focus of post-award activities for awards funded by ARRA. The Recovery Operations Group of the Office of Performance Analysis and Evaluation in the Office of the Chief Financial Officer has been tracking compliance with the reporting requirement for DOE. They developed the attached list of contractors and recipients that have failed to report. Most of those not reporting are recipients receiving money from the Office of Energy Efficiency and Renewable Energy. Contracting Officers are asked to review the attached list for Contractors/Recipients under their cognizance and to send a letter to the requesting their attention, explanation and compliance. Draft templates of letters for a single or double non-compliance are attached. As the next reporting period is from April 1 to April 10,2010, Contracting Officers are requested to send the letter before April 1.

  3. Recipient Reporting Summary by Project | Department of Energy

    Energy Savers [EERE]

    Office spreadsheet icon ARRA875DRecipRptSumProj (4).xls File ARRA875D Recovery Act - ... 2011 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. ...

  4. Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

    SciTech Connect (OSTI)

    Nesse, Ronald J.; Baechler, Michael C.; Iverson, Megan M.

    2010-09-30

    In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

  5. A spreadsheet-coupled SOLGAS: A computerized thermodynamic equilibrium calculation tool. Revision 1

    SciTech Connect (OSTI)

    Trowbridge, L.D.; Leitnaker, J.M.

    1995-07-01

    SOLGAS, an early computer program for calculating equilibrium in a chemical system, has been made more user-friendly, and several ``bells and whistles`` have been added. The necessity to include elemental species has been eliminated. The input of large numbers of starting conditions has been automated. A revised spreadsheet-based format for entering data, including non-ideal binary and ternary mixtures, simplifies and reduces chances for error. Calculational errors by SOLGAS are flagged, and several programming errors are corrected. Auxiliary programs are available to assemble and partially automate plotting of large amounts of data. Thermodynamic input data can be changed on line. The program can be operated with or without a co-processor. Copies of the program, suitable for the IBM-PC or compatibles with at least 384 bytes of low RAM, are available from the authors. This user manual contains appendices with examples of the use of SOLGAS. These range from elementary examples, such as, the relationships among water, ice, and water vapor, to more complex systems: phase diagram calculation of UF{sub 4} and UF{sub 6} system; burning UF{sub 4} in fluorine; thermodynamic calculation of the Cl-F-O-H system; equilibria calculations in the CCl{sub 4}--CH{sub 3}OH system; and limitations applicable to aqueous solutions. An appendix also contains the source code.

  6. Ground Source Heat Pump System Data Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...2013 - GSHP Data Analysis in 1 st phase of U.S.-China CERC-BEE - GSHP ARRA Grantee Data Mining 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem ...

  7. Comprehensive Energy Assessment: EE and RE Project Optimization Modeling for United States Pacific Command (USPACOM) American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect (OSTI)

    Brigantic, Robert T.; Papatyi, Anthony F.; Perkins, Casey J.

    2010-09-30

    This report summarizes a study and corresponding model development conducted in support of the United States Pacific Command (USPACOM) as part of the Federal Energy Management Program (FEMP) American Reinvestment and Recovery Act (ARRA). This research was aimed at developing a mathematical programming framework and accompanying optimization methodology in order to simultaneously evaluate energy efficiency (EE) and renewable energy (RE) opportunities. Once developed, this research then demonstrated this methodology at a USPACOM installation - Camp H.M. Smith, Hawaii. We believe this is the first time such an integrated, joint EE and RE optimization methodology has been constructed and demonstrated.

  8. Weatherization Works II - Summary of Findings from the ARRA Period Evaluation of the U.S. Department of Energy's Weatherization Assistance Program

    SciTech Connect (OSTI)

    Tonn, Bruce Edward; Carroll, David; Rose, Erin M.; Hawkins, Beth A.; Pigg, Scott; Dalhoff, Greg; Blasnik, Michael; Eisenberg, Joel Fred; Cowan, Claire; Conlon, Brian

    2015-10-01

    This report presents a summary of the American Recovery and Reinvestment Act of 2009 (ARRA) evaluation of the U.S. Department of Energy s low-income Weatherization Program. This evaluation focused on the WAP Program Year 2010. The ARRA evaluation produced fourteen separate reports, including this summary. Three separate reports address the energy savings, energy cost savings, and cost effectiveness of WAP across four housing types: single family, mobile home, and large multifamily. Other reports address the environmental emissions benefits attributable to WAP, and characterize the program. Special studies were conducted to: estimate the impacts of weatherization and healthy homes interventions on asthma-related Medicaid claims in a small cohort in Washington State; assess how weatherization recipients communicate their weatherization experiences to those in their social network, and assess processes implemented to defer homes for weatherization. Small studies addressed energy use in refrigerators, WAP as implemented in the U.S. territories for the first time, and weatherization s impacts on air conditioning energy savings. The national occupant survey was mined for additional insights on the impacts of weatherization on household budgets and energy behaviors post-weatherization. Lastly, the results of a survey of weatherization training centers are summarized.

  9. Ground-source Heat Pumps Applied to Commercial Buildings

    SciTech Connect (OSTI)

    Parker, Steven A.; Hadley, Donald L.

    2009-07-14

    Ground-source heat pumps can provide an energy-efficient, cost-effective way to heat and cool commercial facilities. While ground-source heat pumps are well established in the residential sector, their application in larger, commercial-style, facilities is lagging, in part because of a lack of experience with the technology by those in decision-making positions. Through the use of a ground-coupling system, a conventional water-source heat pump design is transformed to a unique means of utilizing thermodynamic properties of earth and groundwater for efficient operation throughout the year in most climates. In essence, the ground (or groundwater) serves as a heat source during winter operation and a heat sink for summer cooling. Many varieties in design are available, so the technology can be adapted to almost any site. Ground-source heat pump systems can be used widely in commercial-building applications and, with proper installation, offer great potential for the commercial sector, where increased efficiency and reduced heating and cooling costs are important. Ground-source heat pump systems require less refrigerant than conventional air-source heat pumps or air-conditioning systems, with the exception of direct-expansion-type ground-source heat pump systems. This chapter provides information and procedures that an energy manager can use to evaluate most ground-source heat pump applications. Ground-source heat pump operation, system types, design variations, energy savings, and other benefits are explained. Guidelines are provided for appropriate application and installation. Two case studies are presented to give the reader a sense of the actual costs and energy savings. A list of manufacturers and references for further reading are included for prospective users who have specific or highly technical questions not fully addressed in this chapter. Sample case spreadsheets are provided in Appendix A. Additional appendixes provide other information on the ground

  10. 371ARRA.pdf

    National Nuclear Security Administration (NNSA)

  11. 373ARRA.pdf

    National Nuclear Security Administration (NNSA)

  12. 374ARRA.pdf

    National Nuclear Security Administration (NNSA)

  13. 377ARRA.pdf

    National Nuclear Security Administration (NNSA)

  14. 382ARRA.pdf

    National Nuclear Security Administration (NNSA)

  15. 385ARRA.pdf

    National Nuclear Security Administration (NNSA)

  16. 386ARRA.pdf

    National Nuclear Security Administration (NNSA)

  17. 391ARRA.pdf

    National Nuclear Security Administration (NNSA)

  18. 392ARRA .pdf

    National Nuclear Security Administration (NNSA)

  19. 397ARRA.pdf

    National Nuclear Security Administration (NNSA)

  20. LANL147ARRA .pdf

    National Nuclear Security Administration (NNSA)

  1. Microsoft Word - ARRA Cover

    Broader source: Energy.gov (indexed) [DOE]

    ... income of 30,701 exceeded the 200 percent poverty level of 21,660 by the amount noted. ... income is at or below 200 percent of the poverty level as determined in accordance with ...

  2. The ARRA EAP En

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 3 Need to Know New Website for LEAP Grant Recipients Energy Assurance Planning Framework Available for LEAP Grant Recipients Information on Energy Emergency Exercises News from the States Alaska Energy Bill Action Items Energy Disruption Tracking Systems Local PMPs/WDPs Reminders Training Opportunities LEAP Webinars/ Conference Calls State Regional Conference Calls GIS Webinar Other Useful Links and Information Information on How to

  3. The ARRA EAP En

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2010 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 4 Need to Know DOE/OE 10-Step Framework Now Available Looking ahead: DOE/OE Regional Exercises News from the States NJ Wind Energy Bill Training Opportunities Upcoming State and Local Informational Sessions Ongoing LEAP Webinars/Regional Calls Action Items Quarterly Progress Reports, 1512 Reports Reminders State and Local Energy Assurance Success Stories Iowa Asheville, NC Other Useful Information and Links DOE/OE Hardening and

  4. The ARRA EAP En

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JANUARY 3, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 1 Need to Know DOE/OE Regional Tabletop Exercise "Smart Grid and Cyber Security for Energy Assurance" Upcoming Events NARUC Winter Meetings National Electricity Forum NASEO/ASERTTI Energy Policy and Technology Outlook Conference Action Items Initial State EA Plans Tabletop Exercises Reminders Energy Assurance Success Stories Phoenix, AZ Speedway, IN Other Useful Information and Links 2010 Energy Sector Specific

  5. The ARRA EAP En

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APRIL 1, 2011 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 2 Need to Know Second DOE/OE Regional Tabletop Exercise PTI Local Government Energy Assurance Guidelines, Vers. 2.0 News from the States CA Electric Utilities Meeting Renewable Energy Goals Action Items Tabletop Exercises Activities Reporting Deadlines Reminders Upcoming Events EIA 2011 Conference 2011 PNWER Summit Energy Assurance Success Stories Red Earth Exercise Recap Other Useful Information and Links NARUC

  6. The ARRA EAP En

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 2, NUMBER 3 Need to Know Third DOE/OE Regional Tabletop Exercise Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Smart Grid Comes to Cities in Ohio Energy Assurance Success Stories Chicago, IL Portland, OR Other Useful Information and Links Hurricane Season Resources Energy Assurance Daily This Week in Petroleum Upcoming Events PNWER Annual Summit NARUC Summer Committee Meetings NASEO

  7. ARRA Electrification Projects

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    U.S. Department of Energy funded multiple electrification projects through the American ... The U.S. Department of Energy funded multiple electrification projects through the ...

  8. Microsoft Word - ARRA cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Inspector General Office of Audit Services Audit Report Selected Aspects of the Commonwealth of Pennsylvania's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program OAS-RA-11-02 November 2010 Department of Energy Washington, DC 20585 November 1, 2010 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY FROM: George W. Collard Assistant Inspector General for National Security and Energy

  9. Review of Literature for Inputs to the National Water Savings Model and Spreadsheet Tool-Commercial/Institutional

    SciTech Connect (OSTI)

    Whitehead, Camilla Dunham; Melody, Moya; Lutz, James

    2009-05-29

    Lawrence Berkeley National Laboratory (LBNL) is developing a computer model and spreadsheet tool for the United States Environmental Protection Agency (EPA) to help estimate the water savings attributable to their WaterSense program. WaterSense has developed a labeling program for three types of plumbing fixtures commonly used in commercial and institutional settings: flushometer valve toilets, urinals, and pre-rinse spray valves. This National Water Savings-Commercial/Institutional (NWS-CI) model is patterned after the National Water Savings-Residential model, which was completed in 2008. Calculating the quantity of water and money saved through the WaterSense labeling program requires three primary inputs: (1) the quantity of a given product in use; (2) the frequency with which units of the product are replaced or are installed in new construction; and (3) the number of times or the duration the product is used in various settings. To obtain the information required for developing the NWS-CI model, LBNL reviewed various resources pertaining to the three WaterSense-labeled commercial/institutional products. The data gathered ranged from the number of commercial buildings in the United States to numbers of employees in various sectors of the economy and plumbing codes for commercial buildings. This document summarizes information obtained about the three products' attributes, quantities, and use in commercial and institutional settings that is needed to estimate how much water EPA's WaterSense program saves.

  10. Ground difference compensating system

    DOE Patents [OSTI]

    Johnson, Kris W.; Akasam, Sivaprasad

    2005-10-25

    A method of ground level compensation includes measuring a voltage of at least one signal with respect to a primary ground potential and measuring, with respect to the primary ground potential, a voltage level associated with a secondary ground potential. A difference between the voltage level associated with the secondary ground potential and an expected value is calculated. The measured voltage of the at least one signal is adjusted by an amount corresponding to the calculated difference.

  11. Ground water and energy

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    This national workshop on ground water and energy was conceived by the US Department of Energy's Office of Environmental Assessments. Generally, OEA needed to know what data are available on ground water, what information is still needed, and how DOE can best utilize what has already been learned. The workshop focussed on three areas: (1) ground water supply; (2) conflicts and barriers to ground water use; and (3) alternatives or solutions to the various issues relating to ground water. (ACR)

  12. CREST Cost of Renewable Energy Spreadsheet Tool: A Model for Developing Cost-based Incentives in the United States. User Manual Version 1

    SciTech Connect (OSTI)

    Gifford, Jason S.; Grace, Robert C.

    2011-03-01

    This user manual helps model users understands how to use the CREST model to support renewable energy incentives, FITs, and other renewable energy rate-setting processes. It reviews the spreadsheet tool, including its layout and conventions, offering context on how and why it was created. It also provides instructions on how to populate the model with inputs that are appropriate for a specific jurisdiction’s policymaking objectives and context. And, it describes the results and outlines how these results may inform decisions about long-term renewable energy support programs.

  13. Estimating Policy-Driven Greenhouse Gas Emissions Trajectories in California: The California Greenhouse Gas Inventory Spreadsheet (GHGIS) Model

    SciTech Connect (OSTI)

    Greenblatt, Jeffery B.

    2013-10-10

    A California Greenhouse Gas Inventory Spreadsheet (GHGIS) model was developed to explore the impact of combinations of state policies on state greenhouse gas (GHG) and regional criteria pollutant emissions. The model included representations of all GHG- emitting sectors of the California economy (including those outside the energy sector, such as high global warming potential gases, waste treatment, agriculture and forestry) in varying degrees of detail, and was carefully calibrated using available data and projections from multiple state agencies and other sources. Starting from basic drivers such as population, numbers of households, gross state product, numbers of vehicles, etc., the model calculated energy demands by type (various types of liquid and gaseous hydrocarbon fuels, electricity and hydrogen), and finally calculated emissions of GHGs and three criteria pollutants: reactive organic gases (ROG), nitrogen oxides (NOx), and fine (2.5 ?m) particulate matter (PM2.5). Calculations were generally statewide, but in some sectors, criteria pollutants were also calculated for two regional air basins: the South Coast Air Basin (SCAB) and the San Joaquin Valley (SJV). Three scenarios were developed that attempt to model: (1) all committed policies, (2) additional, uncommitted policy targets and (3) potential technology and market futures. Each scenario received extensive input from state energy planning agencies, in particular the California Air Resources Board. Results indicate that all three scenarios are able to meet the 2020 statewide GHG targets, and by 2030, statewide GHG emissions range from between 208 and 396 MtCO2/yr. However, none of the scenarios are able to meet the 2050 GHG target of 85 MtCO2/yr, with emissions ranging from 188 to 444 MtCO2/yr, so additional policies will need to be developed for California to meet this stringent future target. A full sensitivity study of major scenario assumptions was also performed. In terms of criteria pollutants

  14. Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

    SciTech Connect (OSTI)

    Francfort, Jim; Bennett, Brion; Carlson, Richard; Garretson, Thomas; Gourley, LauraLee; Karner, Donal; McGuire, Patti; Scoffield, Don; Kirkpatrick, Mindy; Shrik, Matthew; Salisbury, Shawn; Schey, Stephen; Smart, John; White, Sera; Wishard, Jeffery

    2015-09-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles and charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of the

  15. Electrical grounding prong socket

    DOE Patents [OSTI]

    Leong, Robert

    1991-01-01

    The invention is a socket for a grounding prong used in a three prong electrical plug and a receptacle for the three prong plug. The socket being sufficiently spacious to prevent the socket from significantly stretching when a larger, U-shaped grounding prong is inserted into the socket, and having a ridge to allow a snug fit when a smaller tubular shape grounding prong is inserted into the socket.

  16. Property:Reference material | Open Energy Information

    Open Energy Info (EERE)

    ARRA Spreadsheet + 2-M Probe At Gabbs Alkali Flat Area (Kratt, Et Al., 2008) + A New Gold Pan For The West- Discovering Blind Geothermal Systems With Shallow Temperature Surveys...

  17. METHOD OF LOCATING GROUNDS

    DOE Patents [OSTI]

    Macleish, K.G.

    1958-02-11

    ABS>This patent presents a method for locating a ground in a d-c circult having a number of parallel branches connected across a d-c source or generator. The complete method comprises the steps of locating the ground with reference to the mildpoint of the parallel branches by connecting a potentiometer across the terminals of the circuit and connecting the slider of the potentiometer to ground through a current indicating instrument, adjusting the slider to right or left of the mildpoint so as to cause the instrument to indicate zero, connecting the terminal of the network which is farthest from the ground as thus indicated by the potentiometer to ground through a condenser, impressing a ripple voltage on the circuit, and then measuring the ripple voltage at the midpoint of each parallel branch to find the branch in which is the lowest value of ripple voltage, and then measuring the distribution of the ripple voltage along this branch to determine the point at which the ripple voltage drops off to zero or substantially zero due to the existence of a ground. The invention has particular application where a circuit ground is present which will disappear if the normal circuit voltage is removed.

  18. Ground potential rise monitor

    DOE Patents [OSTI]

    Allen, Zachery Warren; Zevenbergen, Gary Allen

    2012-07-17

    A device and method for detecting ground potential rise (GPR) comprising a first electrode, a second electrode, and a voltage attenuator. The first electrode and the second electrode are both electrically connected to the voltage attenuator. A means for determining the presence of a dangerous ground potential is connected to the voltage attenuator. The device and method further comprises a means for enabling one or more alarms upon the detection of the dangerous ground potential. Preferably, a first transmitter/receiver is connected to the means for enabling one or more alarms. Preferably, a second transmitter/receiver, comprising a button, is electromagnetically connected to the first transmitter/receiver. Preferably, the means for determining the presence of a dangerous ground potential comprises a means for determining the true RMS voltage at the output of the voltage attenuator, a transient detector connected to the output of the voltage attenuator, or a combination thereof.

  19. Substation grounding programs

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S. . Electric Power Lab.)

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  20. EM RAP for TWPC ARRA

    Office of Environmental Management (EM)

    and Ohio Power. Mike has 18 years of experience in the DOE weapons complex at Rocky Flats, Hanford, and Oak Ridge, assessing and improving organizational performance, using...

  1. LANLA076ARRA.pdf

    National Nuclear Security Administration (NNSA)

  2. LANLA085ARRA.pdf

    National Nuclear Security Administration (NNSA)

  3. LANLA087ARRA.pdf

    National Nuclear Security Administration (NNSA)

  4. LANLA088ARRA.pdf

    National Nuclear Security Administration (NNSA)

  5. LANLA090ARRA.pdf

    National Nuclear Security Administration (NNSA)

  6. LANLA091ARRA.pdf

    National Nuclear Security Administration (NNSA)

  7. LANLA092ARRA.pdf

    National Nuclear Security Administration (NNSA)

  8. LANLA093ARRA.pdf

    National Nuclear Security Administration (NNSA)

  9. LANLA094ARRA.pdf

    National Nuclear Security Administration (NNSA)

  10. LANLA095ARRA.pdf

    National Nuclear Security Administration (NNSA)

  11. LANLA096ARRA.pdf

    National Nuclear Security Administration (NNSA)

  12. LANLA097ARRA.pdf

    National Nuclear Security Administration (NNSA)

  13. LANLA098ARRA.pdf

    National Nuclear Security Administration (NNSA)

  14. LANLA099ARRA.pdf

    National Nuclear Security Administration (NNSA)

  15. LANLA100ARRA.pdf

    National Nuclear Security Administration (NNSA)

  16. LANLA105ARRA.pdf

    National Nuclear Security Administration (NNSA)

  17. LANLA107ARRA.pdf

    National Nuclear Security Administration (NNSA)

  18. LANLM068ARRA.pdf

    National Nuclear Security Administration (NNSA)

  19. SEP/ARRA Evaluation Webinar

    Broader source: Energy.gov (indexed) [DOE]

    Energy One of several Georgia convenience stores that improved lighting while saving energy and money. | Courtesy of Outlaw Consulting, Inc. One of several Georgia convenience stores that improved lighting while saving energy and money. | Courtesy of Outlaw Consulting, Inc. Convenience stores across Georgia are saving energy thanks to energy efficient lighting upgrades made possible by Recovery Act funds from the State Energy Program and the Georgia Environmental Finance Authority. Learn

  20. AVTA: ARRA EV Project Overview

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following document describes the context of the EV Project, which partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. This research was conducted by Idaho National Laboratory.

  1. SNLA361ARRA.pdf

    National Nuclear Security Administration (NNSA)

  2. M195ARRA.pdf

    National Nuclear Security Administration (NNSA)

  3. Double hull grounding experiments

    SciTech Connect (OSTI)

    Rodd, J.L.; Sikora, J.P.

    1995-12-31

    In the last few years the public and governments of many nations have become increasingly aware of the need for improving oil tanker safety. The requirements for double hull tankers are an attempt to address this need through legislation. Even though a number of investigations on the mechanics of collisions have been done in the past, until recently very little research supported the development of structural improvements to reduce oil tanker damage during grounding and stranding accidents. An aggressive evaluation of double hull tanker crashworthiness in stranding and grounding accidents is underway at CD/NSWC (formerly the David Taylor Research Center). The ability to predict damage from grounding accidents accurately is not currently available. The objective of this paper is to present qualitatively the structural failure mechanisms associated with stranding and grounding events for candidate double hull tanker structures and to present some simple methods for comparing damage scenarios. A comparison of the structural performance of key features in several very different designs will provide useful information toward this understanding.

  4. Grounded Renewable Energy | Open Energy Information

    Open Energy Info (EERE)

    Grounded Renewable Energy Jump to: navigation, search Name: Grounded Renewable Energy Place: Carbondale, Colorado Zip: 81623 Sector: Renewable Energy, Solar Product: Grounded...

  5. Category:Ground Magnetics | Open Energy Information

    Open Energy Info (EERE)

    Ground Magnetics Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermalpower.jpg Looking for the Ground Magnetics page? For detailed information on Ground...

  6. Ground potential rise monitor

    DOE Patents [OSTI]

    Allen, Zachery W.; Zevenbergen, Gary A.

    2012-04-03

    A device and method for detecting ground potential rise (GPR) comprising positioning a first electrode and a second electrode at a distance from each other into the earth. The voltage of the first electrode and second electrode is attenuated by an attenuation factor creating an attenuated voltage. The true RMS voltage of the attenuated voltage is determined creating an attenuated true RMS voltage. The attenuated true RMS voltage is then multiplied by the attenuation factor creating a calculated true RMS voltage. If the calculated true RMS voltage is greater than a first predetermined voltage threshold, a first alarm is enabled at a local location. If user input is received at a remote location acknowledging the first alarm, a first alarm acknowledgment signal is transmitted. The first alarm acknowledgment signal is then received at which time the first alarm is disabled.

  7. CREST Cost of Renewable Energy Spreadsheet Tool: A Model for Developing Cost-Based Incentives in the United States; User Manual Version 4, August 2009 - March 2011 (Updated July 2013)

    SciTech Connect (OSTI)

    Gifford, J. S.; Grace, R. C.

    2013-07-01

    The objective of this document is to help model users understand how to use the CREST model to support renewable energy incentives, FITs, and other renewable energy rate-setting processes. This user manual will walk the reader through the spreadsheet tool, including its layout and conventions, offering context on how and why it was created. This user manual will also provide instructions on how to populate the model with inputs that are appropriate for a specific jurisdiction's policymaking objectives and context. Finally, the user manual will describe the results and outline how these results may inform decisions about long-term renewable energy support programs.

  8. Ground Magnetics | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Ground Magnetics Details Activities (25) Areas (19) Regions (0) NEPA(1) Exploration...

  9. Detailed Photovoltaic Analysis Simulation Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2008-12-31

    The software calculates photovoltaic system energy and financial performance via the utilization of very detailed parameters.

  10. Renewable Energy Cost Optimization Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2007-12-31

    The Software allow users to determine the optimum combination of renewable energy technologies to minimize life cycle cost for a facility by employing various algorithms which calculate initial and operating cost, energy delivery, and other attributes associated with each technology as a function of size.

  11. Regional analysis of ground and above-ground climate

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    The regional suitability of underground construction as a climate control technique is discussed with reference to (1) a bioclimatic analysis of long-term weather data for 29 locations in the United States to determine appropriate above ground climate control techniques, (2) a data base of synthesized ground temperatures for the coterminous United States, and (3) monthly dew point ground temperature comparisons for identifying the relative likelihood of condensation from one region to another. It is concluded that the suitability of earth tempering as a practice and of specific earth-sheltered design stereotypes varies geographically; while the subsurface almost always provides a thermal advantage on its own terms when compared to above ground climatic data, it can, nonetheless, compromise the effectiveness of other, regionally more important climate control techniques. Also contained in the report are reviews of above and below ground climate mapping schemes related to human comfort and architectural design, and detailed description of a theoretical model of ground temperature, heat flow, and heat storage in the ground. Strategies of passive climate control are presented in a discussion of the building bioclimatic analysis procedure which has been applied in a computer analysis of 30 years of weather data for each of 29 locations in the United States.

  12. Inverter Ground Fault Overvoltage Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Task Force on Effective Grounding, ITFEG), led by Brian Lydic of Fronius USA, for providing the test plan that served as the basis for the test procedure used in this study. ...

  13. Ground Penetrating Radar, Barrow, Alaska

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    John Peterson

    2015-03-06

    This is 500 MHz Ground Penetrating Radar collected along the AB Line in Intensive Site 1 beginning in October 2012 and collected along L2 in Intensive Site 0 beginning in September 2011. Both continue to the present.

  14. Ground-water in Texas

    SciTech Connect (OSTI)

    Ward-McLemore, E.

    1985-01-01

    Amount 61% of the water used by Texans is ground-water. Some areas, both municipal and rural, depend entirely on ground-water. In many areas long term withdrawal is lowering the water levels, causing surface land subsidence, salt-water encroachment, and reducing future reservoir availability. The increasing probability of seepage from radioactive and toxic wastes, herbicide residues, septic systems, and oilfield brines is threatening dangerous contamination of fresh ground-water reservoirs. The Texas Department of Water Resources, the Texas Department of Health, State and private colleges and universities, the US Geological Survey, the Environmental Protection Agency, various underground water districts, among others, are cooperating with concerned hydrologists in a concentrated program to increase the efficiency of ground-water use and development, preserve the aquifer reservoirs, and decrease the pollution potential. 88 references.

  15. Document Number Q0029500 Ground Water Model 3.0 Ground Water...

    Office of Legacy Management (LM)

    Ground Water Model 3.0 Ground Water Model This section presents a steady-state ground water flow model and a coupled solute transport model (ground water model) for the alluvial ...

  16. Tritium Ground Water Issues | Department of Energy

    Office of Environmental Management (EM)

    Ground Water Issues Tritium Ground Water Issues Presentation from the 35th Tritium Focus Group Meeting held in Princeton, New Jersey on May 05-07, 2015. Tritium Ground Water Issues ...

  17. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  18. Appendix B Ground Water Management Policy

    Office of Legacy Management (LM)

    Ground Water Management Policy for the Monticello Mill Tailings Site and Adjacent Areas ... OF NATURAL RESOURCES DIVISION OF WATER RIGHTS Ground-Water Management Policy for ...

  19. Ground Source Solutions | Open Energy Information

    Open Energy Info (EERE)

    Kingdom Zip: NG22 9GW Sector: Buildings Product: UK-based installer of ground source energy systems to domestic and commercial buildings. References: Ground Source...

  20. LINE-ABOVE-GROUND ATTENUATOR

    DOE Patents [OSTI]

    Wilds, R.B.; Ames, J.R.

    1957-09-24

    The line-above-ground attenuator provides a continuously variable microwave attenuator for a coaxial line that is capable of high attenuation and low insertion loss. The device consists of a short section of the line-above- ground plane type transmission lime, a pair of identical rectangular slabs of lossy material like polytron, whose longitudinal axes are parallel to and indentically spaced away from either side of the line, and a geared mechanism to adjust amd maintain this spaced relationship. This device permits optimum fineness and accuracy of attenuator control which heretofore has been difficult to achieve.

  1. Ground control for highwall mining

    SciTech Connect (OSTI)

    Zipf, R.K.; Mark, C.

    2007-09-15

    Perhaps the greatest risk to both equipment and personnel associated with highwall mining is from ground control. The two most significant ground control hazards are rock falls from highwall and equipment entrapment underground. In the central Appalachians, where the majority of highwall mining occurs in the USA, hillseams (or mountain cracks) are the most prominent structure that affects highwall stability. The article discusses measures to minimise the risk of failure associated with hillstreams. A 'stuck' or trapped highwall miner, and the ensuring retrieval or recovery operation, can be extremely disruptive to the highwall mining process. Most entrapment, are due to roof falls in the hole. The options for recovery are surface retrieval, surface excavation or underground recovery. Proper pillar design is essential to maintain highwall stability and prevent entrapments. NIOSH has developed the Analysis of Retreat Mining Pillar stability-Highwall Mining (ARMPS-HWM) computer program to help mine planners with this process. 10 figs.

  2. Inverter Ground Fault Overvoltage Testing

    SciTech Connect (OSTI)

    Hoke, Andy; Nelson, Austin; Chakraborty, Sudipta; Chebahtah, Justin; Wang, Trudie; McCarty, Michael

    2015-08-12

    This report describes testing conducted at NREL to determine the duration and magnitude of transient overvoltages created by several commercial PV inverters during ground fault conditions. For this work, a test plan developed by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Load rejection overvoltage test results were reported previously in a separate technical report.

  3. In-Ground Radiation Detection

    SciTech Connect (OSTI)

    McCormick, Kathleen R.; Stromswold, David C.; Woodring, Mitchell L.; Ely, James H.; Siciliano, Edward R.; Caggiano, Joseph A.; Hensley, Walter K.

    2006-10-29

    Vertically oriented radiation detectors may not provide sufficient screening in rail or aviation applications. Railcars can be heavily shielded on the sides, reducing the sensitivity of vertically mounted monitors. For aviation, the distance required for wingspan clearance reduces a vertical detector’s coverage of the fuselage. To surmount these, and other, challenging operational and sensitivity issues, we have investigated the use of in-ground radiation detectors. (PIET-43741-TM-605).

  4. Ground Source Heat Pumps | Open Energy Information

    Open Energy Info (EERE)

    heating andor cooling system that takes advantage of the relatively constant year-round ground temperature to pump heat to or from the ground. Other definitions:Wikipedia Reegle...

  5. Ground Source Heat Pump Subprogram Overview

    Broader source: Energy.gov [DOE]

    This overview of GTP's Ground Source Heat Pump subprogram was given at GTP's Program Peer Review on May 18, 2010.

  6. Ground Magnetics (Nannini, 1986) | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics (Nannini, 1986) Exploration Activity Details Location Unspecified Exploration...

  7. AVTA: ARRA EV Project Annual Infrastructure Reports

    Office of Energy Efficiency and Renewable Energy (EERE)

    These reports summarize charging behavior of drivers that participated in the EV Project, which deployed 14,000 Level 2 PEV chargers and 300 fast chargers.

  8. ARRA521 Recovery Act - Project Daily Report

    Office of Environmental Management (EM)

    Valley Demonstration Project 62,875,000 61,790,821 61,790,821 0 Title X UraniumThorium Reimbursements 70,000,000 69,996,978 69,996,978 0 Management & Oversight ...

  9. Microsoft Word - ARRA Final Report Cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the date specified in the grant agreement. As part of the Office of Inspector General's strategy for reviewing the Department's implementation of the Recovery Act, we initiated...

  10. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan State Legislative Action Smart Grid Info OE Website Guidance from NASEO Know Your ... All DOEOE grantees must confirm the names and contact information of individuals and ...

  11. 033009-ARRA_Program_Direction.pdf

    Office of Environmental Management (EM)

    TRANSPORTATION SAFEGUARDS DIVISION COURIER WORK SCHEDULES AND ESCORT VEHICLE REPLACEMENTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DECEMBER 1998 WR-B-99-01 December 4, 1998 MEMORANDUM FOR THE MANAGER, ALBUQUERQUE OPERATIONS OFFICE FROM: Lawrence R. Ackerly Regional Manager, Western Regional Audit Office Office of Inspector General SUBJECT: INFORMATION : Audit Report on "Transportation Safeguards Division Courier Work Schedules and Escort Vehicle

  12. 070109-SG_Interoperability_Standards_ARRA.PDF

    Office of Environmental Management (EM)

    30 AUDIT REPORT PROJECT HANFORD MANAGEMENT CONTRACT COSTS AND PERFORMANCE U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES NOVEMBER 1998 November 5, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Project Han- ford Management Contract Costs and Performance" BACKGROUND To offset the negative impact of downsizing its facilities, the Department of Energy

  13. The ARRA EAP Energy Assurance Planning Bulletin

    Broader source: Energy.gov (indexed) [DOE]

    Basics" Courses Smart Grid Customer Education Symposium National Town Meeting on Demand Response and Smart Grid Other Useful Information and Links PTI releases new documents ...

  14. Microsoft Word - ARRA Final Report Cover

    Broader source: Energy.gov (indexed) [DOE]

    According to project documentation, 3 million of the total cost will be dedicated to acquiring and installing a Performance Optimized Data Center (POD) at NETL's Morgantown, West ...

  15. Project_Descriptions_ITP_ARRA_Awards.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selections for Industrial Technologies Program Recovery Act Funding Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficient Industrial Equipment Award Winners City and State Project Description Total DOE Funding Air Products and Chemicals, Inc. Middletown, OH Waste Energy Project at the AK Steel Corporation Middletown Works. The project will construct a combined cycle power generation plant at the Middletown, OH, works of AK

  16. Microsoft Word - WIPP ARRA Final Report Cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Memorandum DATE: July 7, 2011 Audit Report Number: OAS-RA-L-11-09 REPLY TO ... TO: Manager, Carlsbad Field Office, Environmental Management INTRODUCTION AND OBJECTIVE ...

  17. ARRA Grid Modernization Investment Highlights - Fact Sheet |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    were successfully managed by the Office of Electricity Delivery and Energy Reliability. ... Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November ...

  18. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Environmental Management (EM)

    the recently completed Electricity Subsector Cybersecurity Capability Maturity Model. ... Richard Reed, Vice President of Preparedness and Resilience Strategy for the American Red ...

  19. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Other Useful Information and Links The Public Technology Institute (PTI) has published a series of new educational documents - and has offered related webinars - in support of ...

  20. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 2 Need to Know DOE/OE National Energy Assurance Conference Action Items DOE Requests Sharing of State EA Plans Exercise and Reporting Deadlines Energy Assurance Success Stories West Virginia News from the States California is Top Renewable State Upcoming Events NMU "The Basics" Courses Smart Grid Customer Education Symposium National Town Meeting on Demand Response and Smart Grid Other Useful Information and Links PTI

  1. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 1 Need to Know DOE/OE National-Level Energy Assurance Conference Action Items DOE to Request Sharing of State EA Plans Exercise and Reporting Deadlines News from the States Texas Home Weatherization Program is a Success Energy Assurance Success Stories Western Regional Energy Assurance Exercise Recap Other Useful Information and Links Introduction to Energy Infrastructure Interdependencies Cyber Security Concerns for LEAP

  2. AVTA: ARRA EV Project Overview Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports provide summary overviews of the EV Project, which partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  3. Synchrophasor Technology Advancement in ARRA Projects: Final...

    Broader source: Energy.gov (indexed) [DOE]

    ... Connecting PMUs that are strategically located across the power grid with high-speed ... improve the grid's efficiency, and prevent or more quickly recover from outages. ...

  4. ARRA Project Info Combined 0112110.xls

    Broader source: Energy.gov (indexed) [DOE]

    Organization Location (State) Description Partners National Alliance for Advanced Biofuels and Bioproducts (NAABB) Led by the Donald Danforth Plant Science Center 44,036,473...

  5. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JULY 9, 2012 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 3, NUMBER 3 Need to Know DOE/OE National Energy Assurance Conference Action Items Final Energy Assurance Plans and Reporting Deadlines News from the States California Approves Energy Efficiency Standards Energy Assurance Success Stories Heber Light & Power Takes Lead on Local EA Planning Upcoming Events NASEO/NARUC Environmental Protection & Clean, Reliable Energy Conference "Camp NARUC" GFIRST 2012 Conference

  6. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, 2010 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 1 Need to Know State Energy Assurance Guidelines Version 3.1 Action Items Update Contacts Recovery Act Report Quarterly Report Training Training Opportunities Upcoming Events February 2010 National Electricity Forum April 2010 Summer Energy Outlook and Energy Data Workshop Other Useful Links and Information Smart Grid Award Recipients DHS Crafts Cyber Preparedness Plan State Legislative Action Smart Grid Info OE Website Guidance

  7. The ARRA EAP Energy Assurance Planning Bulletin

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2010 THE AMERICAN RECOVERY AND REINVESTMENT ACT VOLUME 1, NUMBER 2 Need to Know LEAP Grant Award Recipients Action Items Recovery Act Report Quarterly Report Plan Updates Contact Updates Upcoming Events April 2010 Energy Conference April 2010 Summer Energy Outlook and Energy Data Workshop Training GIS Webinar NASEO Conf. Calls Other Useful Links and Information FEMA's Lessons Learned Website NIST's Cyber Standards News from the States S.D. Ethanol Bill Energy Conference Locality Notes CARRI

  8. Microsoft Word - ARRA Final Report Cover_1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Technologies Program under the American Recovery and Reinvestment Act OAS-RA-11-05 March 2011 Department of Energy Washington, DC 20585 March 22, 2011 MEMORANDUM FOR THE UNDER SECRETARY OF ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Geothermal Technologies Program under the American Recovery and Reinvestment Act" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the

  9. AVTA: ARRA EV Project Vehicle Placement Maps

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  10. Y-12M221ARRA.pdf

    National Nuclear Security Administration (NNSA)

  11. Ground Source Heat Pump Demonstration Projects | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ground Source Heat Pump Demonstration Projects Ground Source Heat Pump Demonstration Projects Below are the project presentations and respective peer review results for Ground ...

  12. Appendix D Surface Water and Ground Water Time-Concentration...

    Office of Legacy Management (LM)

    Surface Water and Ground Water Time-Concentration Plots, Stream Discharge Measurements, Ground Water Level Data, and Ground Water Well Hydrographs This page intentionally left ...

  13. North Village Ground Source Heat Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    North Village Ground Source Heat Pumps North Village Ground Source Heat Pumps Overview: Installation of Ground Source Heat Pumps. Replacement of Aging Heat Pumps. Alignment with ...

  14. Promising Technology: Ground Source Heat Pumps

    Broader source: Energy.gov [DOE]

    Ground source heat pumps (GSHP) use the constant temperature of the Earth as the heat exchange medium instead of the outside air temperature. During the winter, a GSHP uses the ground as a heat source to provide heating, and during the summer, a GSHP uses the ground as a heat sink to provide cooling. Although more expensive than air-source heat pumps, GSHP’s are much more efficient, especially in cold temperatures.

  15. Ground Gravity Survey | Open Energy Information

    Open Energy Info (EERE)

    Et Al., 2000) Dixie Valley Geothermal Area 1999 2000 Precise Gravimetry and Geothermal Reservoir Management Ground Gravity Survey At Dixie Valley Geothermal Area (Blackwell, Et...

  16. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  17. Earth resistivity measurement near substation ground grids

    SciTech Connect (OSTI)

    Lodwig, S.G.; Mateja, S.A.

    1996-11-01

    Proper substation grounding grid design requires good, accurate soil resistivity measurements. This data is essential to model the substation ground grid to design a safe ground grid with a satisfactory ground grid resistance at minimum cost. For substations with several decades of service, there is some concern that a grid may have deteriorated, been damaged during equipment installation or excavation, or that initial soil resistivity measurements were lost or may not have been correctly performed. Ground grid conductors change the substation surface voltage distribution. Any voltage measurements taken at the complete substation will also vary from the tests made without conductors present. During testing, current was injected in the soil by probes placed near the ground grid. The current tends to follow the ground grid conductors since copper is a far better conductor than the soil it is placed in. Resistance readings near grids will be lower than readings in undisturbed soil. Since computer models were unavailable for many years, analyzing the effect of the grid conductors on soil resistivity measurements was very difficult. As a result, soil resistivity measurements made close to substations were of little use to the engineer unless some means of correcting the measured values could be developed. This paper will present results of soil resistivity measurements near a substation ground grid before and after a ground grid has been installed and describes a means of calculating the undisturbed soil model.

  18. Stepped frequency ground penetrating radar

    DOE Patents [OSTI]

    Vadnais, Kenneth G.; Bashforth, Michael B.; Lewallen, Tricia S.; Nammath, Sharyn R.

    1994-01-01

    A stepped frequency ground penetrating radar system is described comprising an RF signal generating section capable of producing stepped frequency signals in spaced and equal increments of time and frequency over a preselected bandwidth which serves as a common RF signal source for both a transmit portion and a receive portion of the system. In the transmit portion of the system the signal is processed into in-phase and quadrature signals which are then amplified and then transmitted toward a target. The reflected signals from the target are then received by a receive antenna and mixed with a reference signal from the common RF signal source in a mixer whose output is then fed through a low pass filter. The DC output, after amplification and demodulation, is digitized and converted into a frequency domain signal by a Fast Fourier Transform. A plot of the frequency domain signals from all of the stepped frequencies broadcast toward and received from the target yields information concerning the range (distance) and cross section (size) of the target.

  19. Enclosed ground-flare incinerator

    DOE Patents [OSTI]

    Wiseman, Thomas R.

    2000-01-01

    An improved ground flare is provided comprising a stack, two or more burner assemblies, and a servicing port so that some of the burner assemblies can be serviced while others remain in operation. The burner assemblies comprise a burner conduit and nozzles which are individually fitted to the stack's burner chamber and are each removably supported in the chamber. Each burner conduit is sealed to and sandwiched between a waste gas inlet port and a matching a closure port on the other side of the stack. The closure port can be opened for physically releasing the burner conduit and supplying sufficient axial movement room for extracting the conduit from the socket, thereby releasing the conduit for hand removal through a servicing port. Preferably, the lower end of the stack is formed of one or more axially displaced lower tubular shells which are concentrically spaced for forming annular inlets for admitting combustion air. An upper tubular exhaust stack, similarly formed, admits additional combustion air for increasing the efficiency of combustion, increasing the flow of exhausted for improved atmospheric dispersion and for cooling the upper stack.

  20. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  1. Strategic Ground Delivery Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Ground Delivery Services Strategic Ground Delivery Services Use of New Strategically Source Agreement UPS.pdf.pdf (96.79 KB) More Documents & Publications POLICY FLASH 2010-42 Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service Minutes from the Print and Mail Managers Exchange Forum Teleconferences

  2. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    prior to Critical Decision (CD) 2, and a ConstructionExecution Readiness EIR for all Major System projects prior to ... Statement of Work (SOW) Template (Combined EIRICE Support ...

  3. START Alaska Historical Energy Usage Spreadsheet

    Broader source: Energy.gov [DOE]

    Communities applying for the DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) Initiative for Community Energy Planning and Projects Round Two are asked to download...

  4. Use and Misuse of Chemical Reactivity Spreadsheets

    SciTech Connect (OSTI)

    Simmons, F

    2005-09-20

    Misidentifying chemical hazards can have serious deleterious effects. Consequences of not identifying a chemical are obvious and include fires, explosions, injury to workers, etc. Consequences of identifying hazards that are really not present can be equally as bad. Misidentifying hazards can result in increased work with loss of productivity, increased expenses, utilization/consumption of scarce resources, and the potential to modify the work to include chemicals or processes that are actually more hazardous than those originally proposed. For these reasons, accurate hazard identification is critical to any safety program. Hazard identification in the world of chemistry is, at best, a daunting task. The knowing or understanding, of the reactions between any of approximately twelve million known chemicals that may be hazardous, is the reason for this task being so arduous. Other variables, such as adding other reactants/contaminants or changing conditions (e.g., temperature, pressure, or concentration), make hazard determination something many would construe as being more than impossibly difficult. Despite these complexities, people who do not have an extensive background in the chemical sciences can be called upon to perform chemical hazard identification. Because hazard identification in the area of chemical safety is so burdensome and because people with a wide variety of training are called upon to perform this work, tools are required to aid in chemical hazard identification. Many tools have been developed. Unfortunately, many of these tools are not seen as the limited resource that they are and are used inappropriately.

  5. Ground Source Heat Pump Subprogram Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EGS Demonstration s, 51.4 Innovative Exploration Technologies, 98.1 Ground Source Heat Pumps, ... chiller, VAV air handling system, and gas-fired hot water boiler *54 GHP units, 200 ...

  6. Ground Source Heat Pumps | Open Energy Information

    Open Energy Info (EERE)

    efficient when cooling your home. Not only does this save energy and money, it reduces air pollution. GSHP System Ground source heat pump systems consist of three parts: the...

  7. Solid waste burial grounds interim safety analysis

    SciTech Connect (OSTI)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  8. 118-K-1 Burial Ground - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim ...

  9. Natural radionuclides in ground waters and cores

    SciTech Connect (OSTI)

    Laul, J.C.; Smith, M.R.; Maiti, T.C.

    1988-01-01

    Investigations of natural radionuclides of uranium and thorium decay series in site-specific ground waters and cores (water/rock interaction) can provide information on the expected migration behavior of their radioactive waste and analog radionuclides in the unlikely event of radioactive releases from a repository. These data in ground waters can provide in situ retardation and sorption/desorption parameters for transport models and their associated kinetics (residence time). These data in cores can also provide information on migration or leaching up to a period of about one million years. Finally, the natural radionuclide data can provide baseline information for future monitoring of possible radioactive waste releases. The natural radionuclides of interest are {sup 238}U, {sup 234}Th, {sup 234}U, {sup 230}Th, {sup 226}Ra, {sup 222}Rn, {sup 210}Pb, {sup 210}Bi, {sup 210}Po, {sup 232}Th, {sup 228}Ra, {sup 228}Th, and {sup 224}Ra. The half-lives of the daughter radionuclides range from 3 days to 2.5 x 10{sup 5} yr. The data discussed are for low ionic strength ground waters from the Hanford (basalt) site and briny ground waters (high ionic strength) and cores from the Deaf Smith salt site. Similar applications of the natural radionuclide data can be extended to the Nevada Tuff repository site and subseabed disposal site. The concentrations of uranium, thorium, radium, lead, and polonium radionuclides are generally very low in ground waters. However, significant differences in disequilibrium exist between basalt and briny ground waters.

  10. Microarcsecond relative astrometry from the ground with a diffractive...

    Office of Scientific and Technical Information (OSTI)

    ground with a diffractive pupil Citation Details In-Document Search Title: Microarcsecond relative astrometry from the ground with a diffractive pupil Authors: Ammons, S M ; ...

  11. Ground Gravity Survey At Clear Lake Area (Skokan, 1993) | Open...

    Open Energy Info (EERE)

    Ground Gravity Survey At Clear Lake Area (Skokan, 1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Clear Lake Area...

  12. Ground Gravity Survey At Coso Geothermal Area (1980) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At Coso Geothermal Area (1980) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Coso Geothermal...

  13. Ground Gravity Survey At Crump's Hot Springs Area (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Crump's Hot Springs Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Crump's Hot...

  14. Ground Gravity Survey At North Brawley Geothermal Area (Biehler...

    Open Energy Info (EERE)

    Ground Gravity Survey At North Brawley Geothermal Area (Biehler, 1964) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At...

  15. Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et...

    Open Energy Info (EERE)

    Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  16. Ground Gravity Survey At Kilauea East Rift Geothermal Area (FURUMOTO...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (FURUMOTO, 1976) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  17. Ground Gravity Survey At Snake River Plain Region (DOE GTP) ...

    Open Energy Info (EERE)

    Ground Gravity Survey At Snake River Plain Region (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Snake River...

  18. Ground Gravity Survey At Kilauea East Rift Geothermal Area (Thomas...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (Thomas, 1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey...

  19. Ground Gravity Survey At Kilauea East Rift Geothermal Area (Broyles...

    Open Energy Info (EERE)

    Ground Gravity Survey At Kilauea East Rift Geothermal Area (Broyles, Et Al., 1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity...

  20. An Updated Site Scale Saturated Zone Ground Water Transport Model...

    Office of Scientific and Technical Information (OSTI)

    An Updated Site Scale Saturated Zone Ground Water Transport Model for Yucca Mountain. Citation Details In-Document Search Title: An Updated Site Scale Saturated Zone Ground Water ...

  1. Department of Veterans Affairs, FONSI - Ground mounted solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ground mounted solar photovoltaic power at San Joaquin National Cemetery Department of Veterans Affairs, FONSI - Ground mounted solar photovoltaic power at San Joaquin National ...

  2. Finite Volume Based Computer Program for Ground Source Heat Pump...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finite Volume Based Computer Program for Ground Source Heat Pump Systems Finite Volume Based Computer Program for Ground Source Heat Pump Systems Project objective: Create a new ...

  3. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    Ground Water Pollution Control System Permit Application Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water Pollution...

  4. Montana Ground Water Pollution Control System Information Webpage...

    Open Energy Info (EERE)

    Ground Water Pollution Control System Information Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water Pollution Control System...

  5. EPA - Ground Water Discharges (EPA's Underground Injection Control...

    Open Energy Info (EERE)

    Ground Water Discharges (EPA's Underground Injection Control Program) webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA - Ground Water...

  6. Data Analysis from Ground Source Heat Pump Demonstration Projects...

    Energy Savers [EERE]

    Analysis from Ground Source Heat Pump Demonstration Projects Data Analysis from Ground Source Heat Pump Demonstration Projects Comparison of building energy use before and after ...

  7. Category:Ground Electromagnetic Techniques | Open Energy Information

    Open Energy Info (EERE)

    Ground Electromagnetic Techniques Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermalpower.jpg Looking for the Ground Electromagnetic Techniques page? For...

  8. FIELD TEST AND EVALUATION OF RESIDENTIAL GROUND SOURCE HEAT PUMP...

    Office of Scientific and Technical Information (OSTI)

    TEST AND EVALUATION OF RESIDENTIAL GROUND SOURCE HEAT PUMP SYSTEMS USING ALTERNATIVE VERTICAL-BORE GROUND HEAT EXCHANGERS Citation Details In-Document Search Title: FIELD TEST AND ...

  9. 2012 Monitoring Research Review: Ground-Based Nuclear Explosion...

    Office of Scientific and Technical Information (OSTI)

    Review: Ground-Based Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: 2012 Monitoring Research Review: Ground-Based Nuclear Explosion Monitoring ...

  10. Water Quality Surface and Ground | Open Energy Information

    Open Energy Info (EERE)

    Water Quality Surface and Ground Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleWaterQualitySurfaceandGround&oldid612197" Feedback...

  11. Substation grounding programs. Volume 5, Applications manual

    SciTech Connect (OSTI)

    Meliopoulos, A.P.S.

    1992-05-01

    This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

  12. Ground Control for Emplacement Drifts for SR

    SciTech Connect (OSTI)

    Y. Sun

    2000-04-07

    This analysis demonstrates that a satisfactory ground control system can be designed for the Yucca Mountain site, and provides the technical basis for the design of ground support systems to be used in repository emplacement and non-emplacement drifts. The repository ground support design was based on analytical methods using acquired computer codes, and focused on the final support systems. A literature review of case histories, including the lessons learned from the design and construction of the ESF, the studies on the seismic damages of underground openings, and the use of rock mass classification systems in the ground support design, was conducted (Sections 6.3.4 and 6.4). This review provided some basis for determining the inputs and methodologies used in this analysis. Stability of the supported and unsupported emplacement and non-emplacement drifts was evaluated in this analysis. The excavation effects (i.e., state of the stress change due to excavation), thermal effects (i.e., due to heat output from waste packages), and seismic effects (i.e., from potential earthquake events) were evaluated, and stress controlled modes of failure were examined for two in situ stress conditions (k_0=0.3 and 1.0) using rock properties representing rock mass categories of 1 and 5. Variation of rock mass units such as the non-lithophysal (Tptpmn) and lithophysal (Tptpll) was considered in the analysis. The focus was on the non-lithophysal unit because this unit appears to be relatively weaker and has much smaller joint spacing. Therefore, the drift stability and ground support needs were considered to be controlled by the design for this rock unit. The ground support systems for both emplacement and non-emplacement drifts were incorporated into the models to assess their performance under in situ, thermal, and seismic loading conditions. Both continuum and discontinuum modeling approaches were employed in the analyses of the rock mass behavior and in the evaluation of the

  13. Record of Decision for Ground Water | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Decision for Ground Water Record of Decision for Ground Water Record of Decision for Ground Water (April 1997) Record of Decision for Ground Water (625.12 KB) More Documents & Publications EIS-0198: Record of Decision EIS-0170: Record of Decision (April 1997) EIS-0251: Second Record of Decision (May 1997)

  14. PV Systems Reliability Final Technical Report: Ground Fault Detection

    SciTech Connect (OSTI)

    Lavrova, Olga; Flicker, Jack David; Johnson, Jay

    2016-01-01

    We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.

  15. Selenium in Oklahoma ground water and soil

    SciTech Connect (OSTI)

    Atalay, A.; Vir Maggon, D.

    1991-03-30

    Selenium with a consumption of 2 liters per day (5). The objectives of this study are: (1) to determine the concentrations of Se in Oklahoma ground water and soil samples. (2) to map the geographical distribution of Se species in Oklahoma. (3) to relate groundwater depth, pH and geology with concentration of Se.

  16. Photovoltaic module mounting clip with integral grounding

    DOE Patents [OSTI]

    Lenox, Carl J.

    2010-08-24

    An electrically conductive mounting/grounding clip, usable with a photovoltaic (PV) assembly of the type having an electrically conductive frame, comprises an electrically conductive body. The body has a central portion and first and second spaced-apart arms extending from the central portion. Each arm has first and second outer portions with frame surface-disrupting element at the outer portions.

  17. Programmatic Environmental Impact Statement for Ground Water | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground Water Programmatic Environmental Impact Statement for Ground Water Volumes I & II (October 1996) Optical character recognition has been applied to these files, but full search capabilities are not guaranteed. Programmatic Environmental Impact Statement for Ground Water-Volume I (10.79 MB) Programmatic Environmental Impact Statement for Ground Water-Volume II

  18. U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan

    Office of Legacy Management (LM)

    GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction

  19. SRS Burial Ground Complex: Remediation in Progress

    SciTech Connect (OSTI)

    Griffin, M.; Crapse, B.; Cowan, S.

    1998-01-21

    Closure of the various areas in the Burial Ground Complex (BGC) represents a major step in the reduction of risk at the Savannah River Site (SRS) and a significant investment of resources. The Burial Ground Complex occupies approximately 195 acres in the central section of the SRS. Approximately 160 acres of the BGC consists of hazardous and radioactive waste disposal sites that require remediation. Of these source acres, one-third have been remediated while two-thirds are undergoing interim or final action. These restoration activities have been carried out in a safe and cost effective manner while minimizing impact to operating facilities. Successful completion of these activities is in large part due to the teamwork demonstrated by the Department of Energy, contractor/subcontractor personnel, and the regulatory agencies. The experience and knowledge gained from the closure of these large disposal facilities can be used to expedite closure of similar facilities.

  20. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  1. Ground-Based Microwave Radiometer Measurements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ground-Based Microwave Radiometer Measurements and Radiosonde Comparisons During the WVIOP2000 Field Experiment D. Cimini University of L'Aquila L'Aquil, Italy E. R. Westwater Cooperative Institute for Research in the Environmental Sciences University of Colorado National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Y. Han Science System Applications National Aeronautics Space Administration Goddard Space Flight Center Greenbelt, Maryland S. Keihm

  2. Compression of ground-motion data

    SciTech Connect (OSTI)

    Long, J.W.

    1981-04-01

    Ground motion data has been recorded for many years at Nevada Test Site and is now stored on thousands of digital tapes. The recording format is very inefficient in terms of space on tape. This report outlines a method to compress the data onto a few hundred tapes while maintaining the accuracy of the recording and allowing restoration of any file to the original format for future use. For future digitizing a more efficient format is described and suggested.

  3. Grounding and shielding in the accelerator environment

    SciTech Connect (OSTI)

    Kerns, Q.

    1991-12-31

    Everyday features of the accelerator environment include long cable runs, high power and low level equipment sharing building space, stray electromagnetic fields and ground voltage differences between the sending and receiving ends of an installation. This paper pictures some Fermilab installations chosen to highlight significant features and presents practices, test methods and equipment that have been helpful in achieving successful shielding. Throughout the report are numbered statements aimed at summarizing good practices and avoiding pitfalls.

  4. Breaking New Ground The Answer Is....

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Ground The Answer Is.... NSTec enters groundbreaking science partnership. CTOS leads the way at FEMA training symposium. Middle School Science Bowl hailed a success. See page 6. See page 8. Use Restriction - What does it Mean? Since 1989, the U.S. Department of Energy Environmental Management (EM) Program has been identifying and addressing areas on the Nevada National Security Site (NNSS) that have been impacted by historical nuclear testing. To date, EM has successfully closed more than

  5. Posters Ground-Based Radiometric Observations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Posters Ground-Based Radiometric Observations of Atmospheric Water for Climate Research J. B. Snider, D. A. Hazen, A. J. Francavilla, W. B. Madsen, and M. D. Jacobson National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Introduction Surface-based microwave and infrared radiometers have been employed by the National Oceanic and Atmospheric Administration's Environmental Technology Laboratory (NOAA/ETL) in climate research since 1987. The ability

  6. Mechanical interface having multiple grounded actuators

    DOE Patents [OSTI]

    Martin, Kenneth M.; Levin, Mike D.; Rosenberg, Louis B.

    1998-01-01

    An apparatus and method for interfacing the motion of a user-manipulable object with a computer system includes a user object physically contacted or grasped by a user. A 3-D spatial mechanism is coupled to the user object, such as a stylus or a medical instrument, and provides three degrees of freedom to the user object. Three grounded actuators provide forces in the three degrees of freedom. Two of the degrees of freedom are a planar workspace provided by a closed-loop linkage of members, and the third degree of freedom is rotation of the planar workspace provided by a rotatable carriage. Capstan drive mechanisms transmit forces between actuators and the user object and include drums coupled to the carriage, pulleys coupled to grounded actuators, and flexible cables transmitting force between the pulleys and the drums. The flexibility of the cable allows the drums to rotate with the carriage while the pulleys and actuators remain fixed to ground. The interface also may include a floating gimbal mechanism coupling the linkage to the user object. The floating gimbal mechanism includes rotatably coupled gimbal members that provide three degrees of freedom to the user object and capstan mechanisms coupled between sensors and the gimbal members for providing enhanced sensor resolution.

  7. CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP ...

  8. Appendix E Supporting Information for Ground Water Modeling

    Office of Legacy Management (LM)

    Supporting Information for Ground Water Modeling This page intentionally left blank Contents Section Geologic Map of Site Area ........................................................................................................ E1.O Stream Flow Measurements ...................................................................................................... E2.0 Estimates of Ground Water Flow .............................................................................................. E3.0

  9. 5-MW Dynamometer Ground Breaking | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-MW Dynamometer Ground Breaking 5-MW Dynamometer Ground Breaking December 19, 2011 - 3:04pm Addthis This is an excerpt from the Fourth Quarter 2011 edition of the Wind Program R&D ...

  10. Designated Ground Water Basin Map | Open Energy Information

    Open Energy Info (EERE)

    Designated Ground Water Basin Map Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Designated Ground Water Basin Map Abstract This webpage provides...

  11. Final Environmental Assessment of Ground Water Compliance at...

    Office of Environmental Management (EM)

    458 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA ... DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick ...

  12. Ground Water Compliance Action Plan for the Old Rifle, Colorado...

    Office of Legacy Management (LM)

    GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, ... GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, ...

  13. Cooperative heat transfer and ground coupled storage system

    DOE Patents [OSTI]

    Metz, P.D.

    A cooperative heat transfer and ground coupled storage system wherein collected solar heat energy is ground stored and permitted to radiate into the adjacent ground for storage therein over an extended period of time when such heat energy is seasonally maximally available. Thereafter, when said heat energy is seasonally minimally available and has propagated through the adjacent ground a substantial distance, the stored heat energy may be retrieved by a circumferentially arranged heat transfer means having a high rate of heat transfer.

  14. Recommendation 195: Mitigation of Contamination in Bear Creek Burial Grounds

    Broader source: Energy.gov [DOE]

    The ORSSAB requests DOE provide possible remedial actions to mitigate releases of contamination from Bear Creek Burial Grounds.

  15. Cooperative heat transfer and ground coupled storage system

    DOE Patents [OSTI]

    Metz, Philip D.

    1982-01-01

    A cooperative heat transfer and ground coupled storage system wherein collected solar heat energy is ground stored and permitted to radiate into the adjacent ground for storage therein over an extended period of time when such heat energy is seasonally maximally available. Thereafter, when said heat energy is seasonally minimally available and has propagated through the adjacent ground a substantial distance, the stored heat energy may be retrieved by a circumferentially arranged heat transfer means having a high rate of heat transfer.

  16. Coal mine ground control. 3rd ed.

    SciTech Connect (OSTI)

    Peng, S.S.

    2008-09-15

    The third edition not only completely revises and updates the original subject areas, but also is broadened to include a number of new topics such as high horizontal stresses, computer modeling, and highwall stability. The subject areas covered in this book define the current field of coal mine ground control, except for the recently emerging topic of mine seals and some conventional subjects such as coal/rock cutting and impoundment dams. It contains 1,134 references from all published sources, and archived since 1876.

  17. Photovoltaic module mounting clip with integral grounding

    DOE Patents [OSTI]

    Lenox, Carl J.

    2008-10-14

    An electrically conductive mounting/grounding clip, for use with a photovoltaic assembly of the type having an electrically conductive frame, comprises an electrically conductive body. The body has a central portion and first and second spaced-apart arms extending generally perpendicular to the central portion. Each arm has an outer portion with each outer portion having an outer end. At least one frame surface-disrupting element is at each outer end. The central portion defines a plane with the frame surface-disrupting elements pointing towards the plane. In some examples each arm extends from the central portion at an acute angle to the plane.

  18. Best Possible Strategy for Finding Ground States

    SciTech Connect (OSTI)

    Franz, Astrid; Hoffmann, Karl Heinz; Salamon, Peter

    2001-06-04

    Finding the ground state of a system with a complex energy landscape is important for many physical problems including protein folding, spin glasses, chemical clusters, and neural networks. Such problems are usually solved by heuristic search methods whose efficacy is judged by empirical performance on selected examples. We present a proof that, within the large class of algorithms that simulate a random walk on the landscape, threshold accepting is the best possible strategy. In particular, it can perform better than simulated annealing and Tsallis statistics. Our proof is the first example of a provably optimal strategy in this area.

  19. Ground-state structures of Hafnium clusters

    SciTech Connect (OSTI)

    Ng, Wei Chun; Yoon, Tiem Leong; Lim, Thong Leng

    2015-04-24

    Hafnium (Hf) is a very large tetra-valence d-block element which is able to form relatively long covalent bond. Researchers are interested to search for substitution to silicon in the semi-conductor industry. We attempt to obtain the ground-state structures of small Hf clusters at both empirical and density-functional theory (DFT) levels. For calculations at the empirical level, charge-optimized many-body functional potential (COMB) is used. The lowest-energy structures are obtained via a novel global-minimum search algorithm known as parallel tempering Monte-Carlo Basin-Hopping and Genetic Algorithm (PTMBHGA). The virtue of using COMB potential for Hf cluster calculation lies in the fact that by including the charge optimization at the valence shells, we can encourage the formation of proper bond hybridization, and thus getting the correct bond order. The obtained structures are further optimized using DFT to ensure a close proximity to the ground-state.

  20. Ground Motion Studies at NuMI

    SciTech Connect (OSTI)

    Mayda M. Velasco; Michal Szleper

    2012-02-20

    Ground motion can cause significant deterioration in the luminosity of a linear collider. Vibration of numerous focusing magnets causes continuous misalignments, which makes the beam emittance grow. For this reason, understanding the seismic vibration of all potential LC sites is essential and related efforts in many sites are ongoing. In this document we summarize the results from the studies specific to Fermilab grounds as requested by the LC project leader at FNAL, Shekhar Mishra in FY04-FY06. The Northwestern group focused on how the ground motion effects vary with depth. Knowledge of depth dependence of the seismic activity is needed in order to decide how deep the LC tunnel should be at sites like Fermilab. The measurements were made in the NuMI tunnel, see Figure 1. We take advantage of the fact that from the beginning to the end of the tunnel there is a height difference of about 350 ft and that there are about five different types of dolomite layers. The support received allowed to pay for three months of salary of Michal Szleper. During this period he worked a 100% of his time in this project. That include one week of preparation: 2.5 months of data taking and data analysis during the full period of the project in order to guarantee that we were recording high quality data. We extended our previous work and made more systematic measurements, which included detailed studies on stability of the vibration amplitudes at different depths over long periods of time. As a consequence, a better control and more efficient averaging out of the daytime variation effects were possible, and a better study of other time dependences before the actual depth dependence was obtained. Those initial measurements were made at the surface and are summarized in Figure 2. All measurements are made with equipment that we already had (two broadband seismometers KS200 from GEOTECH and DL-24 portable data recorder). The offline data analysis took advantage of the full Fourier spectra

  1. MTX (Microwave Tokamak Experiment) facility and machine grounding plan

    SciTech Connect (OSTI)

    Bell, H.H.; Rice, B.W.; Petersen, D.E.; Herrera, C.H.

    1987-10-07

    A key issue in the design of fusion research experiments and their related facilities is the control of ground currents. Because of the large magnetic field, high voltages and high currents present in most of these installations, it is essential to avoid ground loops, and to control ground currents during both normal operations and fault conditions. This paper describes the grounding policy that was developed for MTX. The vault area was divided into zones, and each of the four walls was treated as a separate grounding area. Cable runs and magnet buss bars were run into the machine radially. The paper also describes the steps taken to isolate diagnostic signals and power for pumps and instruments. The paper outlines some of the field calculations used to predict problem areas, and to reveal voltage isolation levels that were required. The paper includes the active ground fault detection system used to insure the integrity of the ground system. 2 refs., 5 figs.

  2. Wide band stepped frequency ground penetrating radar

    DOE Patents [OSTI]

    Bashforth, M.B.; Gardner, D.; Patrick, D.; Lewallen, T.A.; Nammath, S.R.; Painter, K.D.; Vadnais, K.G.

    1996-03-12

    A wide band ground penetrating radar system is described embodying a method wherein a series of radio frequency signals is produced by a single radio frequency source and provided to a transmit antenna for transmission to a target and reflection therefrom to a receive antenna. A phase modulator modulates those portions of the radio frequency signals to be transmitted and the reflected modulated signal is combined in a mixer with the original radio frequency signal to produce a resultant signal which is demodulated to produce a series of direct current voltage signals, the envelope of which forms a cosine wave shaped plot which is processed by a Fast Fourier Transform Unit 44 into frequency domain data wherein the position of a preponderant frequency is indicative of distance to the target and magnitude is indicative of the signature of the target. 6 figs.

  3. Wide band stepped frequency ground penetrating radar

    DOE Patents [OSTI]

    Bashforth, Michael B.; Gardner, Duane; Patrick, Douglas; Lewallen, Tricia A.; Nammath, Sharyn R.; Painter, Kelly D.; Vadnais, Kenneth G.

    1996-01-01

    A wide band ground penetrating radar system (10) embodying a method wherein a series of radio frequency signals (60) is produced by a single radio frequency source (16) and provided to a transmit antenna (26) for transmission to a target (54) and reflection therefrom to a receive antenna (28). A phase modulator (18) modulates those portion of the radio frequency signals (62) to be transmitted and the reflected modulated signal (62) is combined in a mixer (34) with the original radio frequency signal (60) to produce a resultant signal (53) which is demodulated to produce a series of direct current voltage signals (66) the envelope of which forms a cosine wave shaped plot (68) which is processed by a Fast Fourier Transform unit 44 into frequency domain data (70) wherein the position of a preponderant frequency is indicative of distance to the target (54) and magnitude is indicative of the signature of the target (54).

  4. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  5. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  6. Ground freezing for containment of hazardous waste

    SciTech Connect (OSTI)

    Sayles, F.N.; Iskandar, I.K.

    1998-07-01

    The freezing of ground for the containment of subsurface hazardous waste is a promising method that is environmentally friendly and offers a safe alternative to other methods of waste retention in many cases. The frozen soil method offers two concepts for retaining waste. One concept is to freeze the entire waste area into a solid block of frozen soil thus locking the waste in situ. For small areas where the contaminated soil does not include vessels that would rupture from frost action, this concept may be simpler to install. A second concept, of course, is to create a frozen soil barrier to confine the waste within prescribed unfrozen soil boundaries; initial research in this area was funded by EPA, Cincinnati, OH, and the Army Corps of Engineers. The paper discusses advantages and limitations, a case study from Oak Ridge, TN, and a mesh generation program that simulates the cryogenic technology.

  7. Two-Dimensional Ground Water Transport

    Energy Science and Technology Software Center (OSTI)

    1992-03-05

    FRACFLO computes the two-dimensional, space, time dependent, convective dispersive transport of a single radionuclide in an unbounded single or multiple parallel fracture system with constant aperture. It calculates the one-dimensional diffusive transport into the rock matrix as well as the mass flux and cumulative mass flux at any point in the fracture. Steady-state isothermal ground water flow and parallel streamlines are assumed in the fracture, and the rock matrix is considered to be fully saturatedmore » with immobile water. The model can treat a single or multiple finite patch source or a Gaussian distributed source subject to a step or band release mode.« less

  8. Breaking Ground in Miami-Dade

    Broader source: Energy.gov [DOE]

    Officials from Miami-Dade County and the U.S. Department of Energy were on hand Wednesday, October 13th to formally break ground on an innovative project that will help improve the energy efficiency of one of the county’s major water treatment facilities.   The project will upgrade and expand the existing power generation system at the water plant which generates electricity from digester gas produced at the plant.  Landfill gas, which is produced from the Solid Waste Department’s South Dade Landfill, will be collected and piped across a canal to the water plant where it will be mixed with digester gases.  By combining landfill and digester gases, the county will increase the amount of self-generated electricity, and reduce the county's consumption of electricity generated from fossil fuels.  

  9. Natural radionuclides in Hanford site ground waters

    SciTech Connect (OSTI)

    Smith, M.R.; Laul, J.C.; Johnson, V.G.

    1987-10-01

    Uranium, Th, Ra, Rn, Pb and Po radionuclide concentrations in ground waters from the Hanford Site indicate that U, Th, and Ra are highly sorbed. Relative to Rn, these radionuclides are low by factors of 10/sup -3/ to 10/sup -6/. Uranium sorption is likely due to its reduction from the +6 state, where it is introduced via surface waters, to the +4 state found in the confined aquifers. The distribution of radionuclides is very similar in all of the confined aquifers and significantly different from the distribution observed in the unconfined and surface waters. Barium correlates well with Ra over three orders of magnitude, indicating that stable element analogs may be useful for inferring the behavior of radioactive waste radionuclides in this candidate geologic repository. 8 refs., 7 figs., 1 tab.

  10. Monitoring SERC Technologies -Geothermal/Ground Source Heat Pumps |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Monitoring SERC Technologies -Geothermal/Ground Source Heat Pumps Monitoring SERC Technologies -Geothermal/Ground Source Heat Pumps On Nov. 3, 2011, Dave Peterson, a Project Leader at the National Renewable Energy Laboratory, presented a Webinar about Geothermal/Ground Source Heat Pumps and how to properly monitor their installation. View the webinar presentation or read the transcript. More Information Some resources and tools mentioned in the presentation include: U.S.

  11. High Frequency Ground Motion Simulation for Seismic Hazard Analysis |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Leadership Computing Facility Ground motion simulations reveal regions at risk Ground motion simulations reveal regions at risk of strong shaking during a possible magnitude-8 earthquake on the San Andreas fault. For the CyberShake project, reciprocal simulations of all known possible quakes are combined to estimate the total probabilistic hazard for California. Credit: Geoffrey Ely, Argonne National Laboratory High Frequency Ground Motion Simulation for Seismic Hazard Analysis PI

  12. High Frequency Ground Motion Simulation for Seismic Hazard Analysis |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Leadership Computing Facility Orange, yellow, and white colors on this map of California reveal regions where strong ground shaking would occur during a possible magnitude-8 earthquake on the San Andreas Fault Orange, yellow, and white colors on this map of California reveal regions where strong ground shaking would occur during a possible magnitude-8 earthquake on the San Andreas Fault. The seismograms shown on the map indicate peak velocity ground motions for selected California

  13. Cleanup Verification Package for the 618-3 Burial Ground

    SciTech Connect (OSTI)

    M. J. Appel

    2006-09-12

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings.

  14. Renewable Energy Opportunities at Yuma Proving Ground, Arizona

    SciTech Connect (OSTI)

    Orrell, Alice C.; Kora, Angela R.; Russo, Bryan J.; Williamson, Jennifer L.; Weimar, Mark R.; Gorrissen, Willy J.; Dixon, Douglas R.

    2010-06-30

    This document provides an overview of renewable resource potential at Yuma Proving Ground, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations.

  15. Microsoft Word - HABAdv#243_SWBurialGrounds.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... releases. * The Board advises DOE to provide total volume estimates of plutonium, uranium, cesium, and thorium 232, which were recorded as disposed in the burial grounds. ...

  16. Pantex breaks ground on renewable energy project | National Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    breaks ground on renewable energy project | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  17. Seismic Ground Motion Response Using SHAKE, EERA and NERA for...

    Office of Environmental Management (EM)

    Seismic Ground Motion Response Using SHAKE, EERA and NERA for SRS Soil Profile Jay Amin - Structural Mechanics, Principal Engineer Shawn Carey, PhD, PE - Structural Mechanics, ...

  18. Ground Gravity Survey At Blue Mountain Geothermal Area (Fairbank...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Blue Mountain Geothermal Area (Fairbank Engineering Ltd, 2003) Exploration Activity Details...

  19. Category:Ground Gravity Survey | Open Energy Information

    Open Energy Info (EERE)

    Apps Datasets Community Login | Sign Up Search Category Edit History Category:Ground Gravity Survey Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home...

  20. Ground Gravity Survey At Coso Geothermal Area (1990) | Open Energy...

    Open Energy Info (EERE)

    (1990) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Ground Gravity Survey Activity Date 1990 Usefulness not indicated DOE-funding Unknown...

  1. Ground Gravity Survey At Chocolate Mountains Area (Alm, Et Al...

    Open Energy Info (EERE)

    Chocolate Mountains Area (Alm, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Chocolate Mountains Area...

  2. Ground Magnetics At Chocolate Mountains Area (Alm, Et Al., 2010...

    Open Energy Info (EERE)

    Chocolate Mountains Area (Alm, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Chocolate Mountains Area (Alm,...

  3. Ground Gravity Survey At Under Steamboat Springs Area (Warpinski...

    Open Energy Info (EERE)

    Ground Gravity Survey Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D....

  4. Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2004)...

    Open Energy Info (EERE)

    Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D....

  5. Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al...

    Open Energy Info (EERE)

    Technique Ground Magnetics Activity Date Usefulness useful DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D....

  6. Ground Magnetics At Silver Peak Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Silver Peak Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Silver Peak Area (DOE GTP) Exploration Activity...

  7. Ground Magnetics At Alum Area (DOE GTP) | Open Energy Information

    Open Energy Info (EERE)

    Alum Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Alum Area (DOE GTP) Exploration Activity Details Location...

  8. Ground Gravity Survey At Newberry Caldera Area (DOE GTP) | Open...

    Open Energy Info (EERE)

    Newberry Caldera Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Newberry Caldera Area (DOE GTP)...

  9. Simulation of Explosion Ground Motions Using a Hydrodynamic-to...

    Office of Scientific and Technical Information (OSTI)

    Simulation of Explosion Ground Motions Using a Hydrodynamic-to-Elastic Coupling Approach in Three-Dimensions Citation Details In-Document Search Title: Simulation of Explosion ...

  10. Ground Magnetics At North Brawley Geothermal Area (Edmunds &...

    Open Energy Info (EERE)

    North Brawley Geothermal Area (Edmunds & W., 1977) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At North Brawley Geothermal...

  11. LANL breaks ground on key sediment control project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sediment control project LANL breaks ground on key sediment control project Called "grade-control" structures, the approximately 2 million features are up to eight feet high and...

  12. Ground Water Management District Rules | Open Energy Information

    Open Energy Info (EERE)

    Water Management District Rules Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Ground Water Management District Rules Abstract This webpage provides...

  13. Ground Gravity Survey At Mcgee Mountain Area (DOE GTP) | Open...

    Open Energy Info (EERE)

    Mcgee Mountain Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Mcgee Mountain Area (DOE GTP) Exploration...

  14. Ground Gravity Survey At Truckhaven Area (Warpinski, Et Al.,...

    Open Energy Info (EERE)

    2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Truckhaven Area (Warpinski, Et Al., 2004) Exploration Activity...

  15. Ground Gravity Survey At Lake City Hot Springs Area (Warpinski...

    Open Energy Info (EERE)

    Exploration Activity Details Location Lake City Hot Springs Area Exploration Technique Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes The...

  16. Proceedings of the 2010 Monitoring Research Review: Ground-Based...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: Proceedings of the 2010 Monitoring Research Review: Ground-Based Nuclear Explosion ...

  17. Proceedings of the 2011 Monitoring Research Review: Ground-Based...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: Proceedings of the 2011 Monitoring Research Review: Ground-Based Nuclear Explosion ...

  18. Proceedings of the 2009 Monitoring Research Review: Ground-Based...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: Proceedings of the 2009 Monitoring Research Review: Ground-Based Nuclear Explosion ...

  19. Diffusion Multilayer Sampling of Ground Water in Five Wells at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of MSE Cores Tuba City, Arizona, Site Analysis of Contaminant Rebound in Ground Water in Extraction Wells at the Tuba City, Arizona, Site Vertical Distribution of ...

  20. Ground Magnetics At San Francisco Volcanic Field Area (Warpinski...

    Open Energy Info (EERE)

    San Francisco Volcanic Field Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At San Francisco...

  1. Ground Gravity Survey At San Francisco Volcanic Field Area (Warpinski...

    Open Energy Info (EERE)

    Francisco Volcanic Field Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At San Francisco...

  2. Ground Magnetics At Coso Geothermal Area (1984) | Open Energy...

    Open Energy Info (EERE)

    alteration along faults suggests that hot fluid filled fractures with high permeability. References Roquemore, G. R. (10 May 1984) Ground magnetic survey in the Coso...

  3. Ground Magnetics At Raft River Geothermal Area (1979) | Open...

    Open Energy Info (EERE)

    Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Raft River Geothermal Area (1979)...

  4. Ground Gravity Survey At Raft River Geothermal Area (1978) |...

    Open Energy Info (EERE)

    search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Raft River Geothermal Area (1978) Exploration Activity Details Location Raft River...

  5. Ground water in Animas Valley, Hidalgo County, New Mexico | Open...

    Open Energy Info (EERE)

    to library Report: Ground water in Animas Valley, Hidalgo County, New Mexico Author H. O. Reeder Published New Mexico State Engineer's Office, 1957 Report Number Technical...

  6. Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area - Vapor (Warpinski, Et Al., 2002) Exploration Activity Details...

  7. Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002)...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Cove Fort Area (Warpinski, Et Al., 2002) Exploration Activity Details Location...

  8. Ground Magnetics At Chena Geothermal Area (Kolker, 2008) | Open...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Chena Geothermal Area (Kolker, 2008) Exploration Activity Details Location Chena...

  9. Ground Magnetics At Crump's Hot Springs Area (DOE GTP) | Open...

    Open Energy Info (EERE)

    to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Magnetics At Crump's Hot Springs Area (DOE GTP) Exploration Activity Details Location Crump's...

  10. EM ARRA Best Practices and Lessons Learned Workshop: Overview...

    Office of Environmental Management (EM)

    211,975,000 211,975,000 211,960,351 Moab 108,350,000 108,350,000 108,204,128 ... Status - January 2012 www.em.doe.gov 8 Safety and Health www.em.doe.gov 9 Lessons Learned - ...

  11. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 15 GEOTHERMAL ENERGY AIR-COOLED CONDENSERS; POWER PLANT COOLING; BINARY-CYCLE; FINNED-TUBE; HEAT TRANSFER; NEVADA; ...

  12. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    SciTech Connect (OSTI)

    Bharathan, D.

    2013-06-01

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  13. AVTA: ARRA EV Project Public Charging Infrastructure Maps

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed thousands of public chargers. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  14. Environmental Management American Recovery & Reinvestment Act (ARRA) Lessons Learned

    Broader source: Energy.gov [DOE]

    EM has compiled many valuable lessons learned from the American Recovery and Reinvestment Act Program. Here are a few examples: Use a phased approached to the release of funding based on...

  15. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect (OSTI)

    Robert P. Breckenridge; Thomas R. Wood

    2010-08-01

    The purpose of this document is to evaluate the opportunity for Letterkenny Army Depot (LEAD or the Depot) to utilize biogenic methane, which may be available in shale formations under the Depot, to provide a supplemental source of natural gas that could allow the Depot to increase energy independence. Both the Director and Deputy of Public Works at the Depot are supportive in general of a methane production project, but wanted to better understand the challenges prior to embarking on such a project. This report will cover many of these issues. A similar project has been successfully developed by the U. S. Army at Ft. Knox, KY, which will be explained and referred to throughout this report as a backdrop to discussing the challenges and opportunities at LEAD, because the geologic formations and possibilities at both sites are similar. Prior to discussing the opportunity at LEAD, it is important to briefly discuss the successful methane recovery operation at Ft. Knox, because it is applicable to the projected approach for the LEAD methane system. The Ft. Knox project is an excellent example of how the U. S. Army can use an onsite renewable resource to provide a secure energy source that is not dependent on regional energy networks and foreign oil. At Ft. Knox, the U. S. Army contracted (through a utility co-op) with an energy production company to drill wells, establish a distribution infrastructure, and provide the equipment needed to prepare and compress the produced methane gas for use by base operations. The energy production company agreed to conduct the exploratory investigation at Ft. Knox with no cost to the government, as long as they could be granted a long-term contract if a reliable energy resource was established. The Depot is located, in part, over an Ordovician Age shale formation that may have the potential for producing biogenic methane, similar to the Devonian Age shale found beneath Ft. Knox. However, the Ordovician Age Shale beneath the Letterkenny Depot is not known to have any currently producing gas wells.

  16. AVTA: Chevrolet Volt ARRA Vehicle Demonstration Project Data

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports summarize data collected from a project General Motors conducted to deploy 150 2011 Chevrolet Volts around the country. This research was conducted by Idaho National Laboratory.

  17. American Recovery & Reinvestment Act, ARRA, clean energy projects, energy

    Broader source: Energy.gov (indexed) [DOE]

    American Express OPEN has teamed up with Women Impacting Public Policy (WIPP) and the U.S. Small Business Administration (SBA) to offer a ChallengeHER event with an OPEN for Government Contracts: Contract Connections session. This event is designed to help women-owned businesses build long-lasting, lucrative business relationships while assisting Government officials and Prime Contractors in meeting their small business goals. To learn more, please email: ContractConnections@govbizsolutions.com

  18. AVTA: ARRA EV Project Electric Grid Impact Report

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following report describes lessons learned about the impact on the electrical grid from the EV Project. The EV Project partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. This research was conducted by Idaho National Laboratory.

  19. WCH_CMP_NOV2009_ARRA_Attachment-A.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  20. Weatherization Works II - Summary of Findings from the ARRA Period...

    Broader source: Energy.gov (indexed) [DOE]

    ... For example, the income eligibility requirements were adjusted from being 150% of the federal poverty level to 200% and the average amount of DOE funds that could be invested in a ...

  1. Navy's Geothermal Program Office: Overview of Recovery Act (ARRA...

    Open Energy Info (EERE)

    to medium-sized (e.g. 5-50 MWe), conventional geothermal systems exist in the western U.S. Most of these may ultimately be classified as 'blind' discoveries because of their...

  2. ARRA Program Celebrates Milestone 600,000 Smart Meter Installations

    Broader source: Energy.gov [DOE]

    On April 11, 2012, DOE Recovery Act funding recipient Sacramento Municipal Utility District (SMUD) celebrated a major milestone in the development of a regional smart grid in California: the installation of over 600,000 smart meters.

  3. Project Title: Office Trailers for ARRA Project (4502)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  4. ARRA Economic Impact and Jobs | Department of Energy

    Office of Environmental Management (EM)

    Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers | Department of Energy A Requirement for Significant Reduction in the Maximum BTU Input Rate of Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers A Requirement for Significant Reduction in the Maximum BTU Input Rate of Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers Comment that a requirement to reduce the BTU input rate of existing decorative

  5. 06-08-2010 ARRA-10-0146

    National Nuclear Security Administration (NNSA)

    and paint the heliostat pedestals at the Central Receiver Test Facility (CRTF) at the National Solar Thermal Test Facility (NSTTF). Sandia Site Office Replacement Facets ...

  6. Data Analysis for ARRA-funded GSHIP Demos

    Energy Savers [EERE]

    data loggers for 2 months - Well water supply temperature - Heat pump energy and output - Heat pump load side flow rate - Well pump current Progress and Accomplishments Analysis of...

  7. Progress on ARRA-funded Facility & Capability Upgrades for the...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Vehicle Technologies Office Merit Review 2015: Battery Safety Testing Vehicle Technologies Office Merit Review 2014: Battery Safety Testing Vehicle ...

  8. 09-01-2010 ARRA-10-0300

    National Nuclear Security Administration (NNSA)

    initiate modifications to the existing Battery Abuse Testing Laboratory (BATLab) located ... Upgrades would also allow testing of a wider variety of battery types. No new hazards ...

  9. POLICY GUIDANCE MEMORANDUM #01 Documenting Hires Funded by ARRA (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Documenting Hires funded by American Recovery and Reinvestment Act of 2009

  10. Microsoft Word - ARRA INVESTMENT RELEASE REVISED FINAL Aug 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP USES RECOVERY ACT FUNDING TO REDUCE NUCLEAR WASTE FOOTPRINT CARLSBAD, N.M., August 2, 2011 - The U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) reduced the nuclear waste footprint by using American Recovery and Reinvestment Act funds to expedite the clean up of five transuranic (TRU) waste storage sites and to make important infrastructure improvements at the Waste Isolation Pilot Plant (WIPP). Expediting TRU waste shipments supports DOE's goal to dispose of 90 percent of

  11. Microsoft Word - ARRA2011ThirdQuarterUpdate.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Points of Contact: Geoff Tyree, DOE Richland Operations Office (509) 376-4171, Geoffrey.Tyree@rl.doe.gov Erik Olds, DOE Office of River Protection www.hanford.gov/recovery (509) 372-8656,Theodore_E_Erik_Olds@orp.doe.gov RECOVERY ACT JOBS: HANFORD SITE HANFORD FUNDS (Payments as of Sept. 30, 2011) Allocated Spent to Date DOE Richland Operations Office $1,634,500,000 $1,459,423,508 DOE Office of River Protection $326,035,000 $313,577,729 Hanford Total $1,960,535,000 $1,773,001,237 HANFORD

  12. Microsoft Word - Carlsbad ARRA Office Release-Final-1 _2_

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE CARLSBAD FIELD OFFICE OPENS LOCAL RECOVERY ACT OFFICE CARLSBAD, N.M., June 25, 2009 - The U.S. Department of Energy announced today that DOE's Carlsbad Field Office (CBFO) recently opened a local office to support the CBFO Recovery Act Project. The office - located at 315 N. Canal - will be staffed by CBFO and contractor personnel dedicated to managing CBFO Recovery Act Project activities. In order to meet the Recovery Act's commitment to transparency and accountability, the office staff

  13. AVTA: ARRA EV Project Nissan Leaf Data Summary Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports provide summary overviews of the 5,700 all-electric Nissan Leafs deployed through the EV Project. It also deployed about 14,000 Level 2 PEV chargers and 300 DC fast chargers. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  14. Microsoft Word - HABAdv #232_ARRA_Funding.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  15. AVTA: ARRA EV Project Chevrolet Volt Data Summary Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports provide summary overviews of the 2,600 plug-in hybrid electric Chevrolet Volts deployed through the EV Project. It also deployed about 14,000 Level 2 PEV chargers and 300 DC fast chargers. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  16. 04-06-2010 ARRA-10-0162

    National Nuclear Security Administration (NNSA)

    ...wildlife management B1.26 - Sitingconstructionoperationdecommissioning of small water B1.27 - Disconnection of utilities B1.28 - Placement of unused facilities in ...

  17. 05-19-2010 ARRA-10-0238

    National Nuclear Security Administration (NNSA)

    ...wildlife management B1.26 - Sitingconstructionoperationdecommissioning of small water B1.27 - Disconnection of utilities B1.28 - Placement of unused facilities in ...

  18. 06-14-2010 ARRA-10-0185

    National Nuclear Security Administration (NNSA)

    ...wildlife management B1.26 - Sitingconstructionoperationdecommissioning of small water B1.27 - Disconnection of utilities B1.28 - Placement of unused facilities in ...

  19. 07-09-2010 ARRA-10-0180

    National Nuclear Security Administration (NNSA)

    ...wildlife management B1.26 - Sitingconstructionoperationdecommissioning of small water B1.27 - Disconnection of utilities B1.28 - Placement of unused facilities in ...

  20. 2009-04 "Priorities for ARRA Stimulus Funding for Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the citizens of Northern New Mexico in the high-paying clean-up jobs over the ... More Documents & Publications 2009-09 "Support for Community Outreach on EM Education and ...

  1. Project_Descriptions_ITP_ARRA_Awards.xls | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications Capturing Waste Gas: Saves Energy, Lower Costs - Case Study, 2013 Combined Heat and Power Market Potential for Opportunity Fuels, August...

  2. Microsoft Word - ARRA INVESTMENT RELEASE REVISED FINAL Aug 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    were cleaned of legacy TRU waste during its first 10 years. Through the Recovery Act investment, eight additional sites will be cleaned of legacy TRU waste during the three year...

  3. American Recovery & Reinvestment Act, ARRA, clean energy projects...

    Broader source: Energy.gov (indexed) [DOE]

    the District of Columbia reflect a broad range of clean energy projects, from energy efficiency and the smart grid to renewable energy and advanced battery manufacturing. Through ...

  4. EAC Presentation: Metrics and Benefits Analysis for the ARRA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and benefits analysis for the American Recovery and Reinvestment Act smart grid programs including the Smart Grid Investment Grants and the Smart Grid Demonstration Program. ...

  5. Weatherization Formula Grants- American Recovery and Reinvestment Act (ARRA)

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Weatherization Assistance Program, funding for the states, energy efficiency for low-income families, American Recovery and Reinvestment Act of 2009

  6. ARRA Site Characterization Projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are developing comprehensive data sets of formation characteristics (porosity, permeability, reservoir architecture, cap rock integrity, etc.) while also acquiring information...

  7. ARRA wraps up | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and paved the way for further modernization activities at the site," said Eva Irwin, who co-led the Recovery Act work. Most of the 200 B&W Y-12 jobs resulted from a...

  8. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 1, NUMBER 4. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  9. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 3, NUMBER 3. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  10. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 3, NUMBER 4. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  11. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 1, NUMBER 3. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  12. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 2, NUMBER 4. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  13. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 3, NUMBER 2. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  14. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 1, NUMBER 1. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  15. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 2, NUMBER 3. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  16. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 2, NUMBER 1. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  17. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 1, NUMBER 2. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  18. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 2, NUMBER 2. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  19. The American Recovery and Reinvestment Act (ARRA) Energy Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VOLUME 3, NUMBER 1. For more information about how OE is protecting and improving the resiliency of the Energy Sector in the face of both manmade and natural disasters, visit the ...

  20. ARRA Homes Weatherized by Grantee | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Montana 3,310 6,860 Navajo Nation 610 855 Nebraska 3,590 4,842 Nevada** 8,081 9,974 New Hampshire 2,742 3,581 New Jersey 11,290 13,989 New Mexico 3,201 4,488 New York** 40,021 ...

  1. ARRA870A Recovery Act - Recip Details for Next Quarter

    Broader source: Energy.gov (indexed) [DOE]

    ... Innovative Exploration Technologies",831282384,81.087,,"app... "FLODESIGN WIND TURBINE CORP.","AR0000015","Contra...vnd.ms-excel" "FLORIDA A & M ...

  2. American Recovery and Reinvestment Act (ARRA) Sustainable Initiatives...

    Broader source: Energy.gov (indexed) [DOE]

    Housing Authority Project Description: Construct 20 housing units, and a community building & longhouse *Green and Energy Efficient Features *LEED GoldPlatinum certification ...

  3. Procedures for ground-water investigations. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  4. Ground water hydrology report: Revision 1, Attachment 3. Final

    SciTech Connect (OSTI)

    1996-12-01

    This report presents ground water hydrogeologic activities for the Maybell, Colorado, Uranium Mill Tailings Remedial Action Project site. The Department of Energy has characterized the hydrogeology, water quality, and water resources at the site and determined that the proposed remedial action would comply with the requirements of the EPA ground water protection standards.

  5. Fire hazards analysis for solid waste burial grounds

    SciTech Connect (OSTI)

    McDonald, K.M.

    1995-09-28

    This document comprises the fire hazards analysis for the solid waste burial grounds, including TRU trenches, low-level burial grounds, radioactive mixed waste trenches, etc. It analyzes fire potential, and fire damage potential for these facilities. Fire scenarios may be utilized in future safety analysis work, or for increasing the understanding of where hazards may exist in the present operation.

  6. Hanford Site ground-water monitoring for 1994

    SciTech Connect (OSTI)

    Dresel, P.E.; Thorne, P.D.; Luttrell, S.P.

    1995-08-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1994 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiologic and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1994 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1993 and June 1994. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal.

  7. SB Electronics Breaks Ground on New Factory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SB Electronics Breaks Ground on New Factory SB Electronics Breaks Ground on New Factory April 29, 2010 - 5:22pm Addthis U.S. Rep. Peter Welch (from left), Vermont Lt. Gov. Brian Dubie, SBE board member Win Hunter, SBE board chair Stan Fishkin, Assi U.S. Rep. Peter Welch (from left), Vermont Lt. Gov. Brian Dubie, SBE board member Win Hunter, SBE board chair Stan Fishkin, Assi Paul Lester Paul Lester Digital Content Specialist, Office of Public Affairs A Vermont company broke ground on a new

  8. Ground plane insulating coating for proximity focused devices

    DOE Patents [OSTI]

    Power, Gary D.

    1998-01-01

    A thin layer of alumina (aluminum oxide) is coated onto the ground plane of a microchannel plate (MCP) without covering the pores of the MCP so it does not effect the performance. The coating is sputtered onto the ground plane at a very steep angle. The addition of the thin dielectric coating of alumina greatly improves the spatial resolution of proximity focused image intensifiers using a narrow gap between the phosphor screen and the MCP. With the coating on the ground plane and the same gap the phosphor screen can be ran at 9000 volts, as compared to 3 kV without the coating.

  9. Ground plane insulating coating for proximity focused devices

    DOE Patents [OSTI]

    Power, G.D.

    1998-07-14

    A thin layer of alumina (aluminum oxide) is coated onto the ground plane of a microchannel plate (MCP) without covering the pores of the MCP so it does not effect the performance. The coating is sputtered onto the ground plane at a very steep angle. The addition of the thin dielectric coating of alumina greatly improves the spatial resolution of proximity focused image intensifiers using a narrow gap between the phosphor screen and the MCP. With the coating on the ground plane and the same gap the phosphor screen can be ran at 9000 volts, as compared to 3 kV without the coating. 3 figs.

  10. Mk12A/W78 ground test project (u)

    SciTech Connect (OSTI)

    Stokes, Kyle R

    2010-12-01

    The slides present the scope, objectives and status of the Mk12A1W78 Ground Test Project for the purpose of updating the ICBM Project Officers Group. In addition, project constraints and risks are discussed.

  11. Apparatus and method for grounding compressed fuel fueling operator

    DOE Patents [OSTI]

    Cohen, Joseph Perry; Farese, David John; Xu, Jianguo

    2002-06-11

    A safety system for grounding an operator at a fueling station prior to removing a fuel fill nozzle from a fuel tank upon completion of a fuel filling operation is provided which includes a fuel tank port in communication with the fuel tank for receiving and retaining the nozzle during the fuel filling operation and a grounding device adjacent to the fuel tank port which includes a grounding switch having a contact member that receives physical contact by the operator and where physical contact of the contact member activates the grounding switch. A releasable interlock is included that provides a lock position wherein the nozzle is locked into the port upon insertion of the nozzle into the port and a release position wherein the nozzle is releasable from the port upon completion of the fuel filling operation and after physical contact of the contact member is accomplished.

  12. Tennessee: Ground-Source Heat Pump Receives Innovation Award...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The new Trilogy 40 Q-Mode(tm) series, a highly efficient ground-source heat pump that has the capability of providing all the space heating, cooling, and water heating requirements ...

  13. SARA Cadets and Midshipmen Hit the Ground Running | National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SARA Cadets and Midshipmen Hit the Ground Running As the U.S. military grows in ... and midshipmen from the military academies at West Point, Annapolis, and Colorado Springs. ...

  14. Ground Gravity Survey At Cove Fort Area - Vapor (Warpinski, Et...

    Open Energy Info (EERE)

    Ground Gravity Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes Update to Warpinski, et al., 2002 References N. R. Warpinski, A. R. Sattler, R. Fortuna, D....

  15. EPA Final Ground Water Rule Available Online, 3/07

    Office of Energy Efficiency and Renewable Energy (EERE)

    On November 8, 2006, the U.S. Environmental Protection Agency (EPA) published a final Ground Water Rule (GWR) to promote increased protection against microbial pathogens that may be present in...

  16. New Carlsbad Field Office Manager Hits the Ground Running | Department...

    Office of Environmental Management (EM)

    Carlsbad Field Office Manager Hits the Ground Running New Carlsbad Field Office Manager ... In fact, his first weeks in his new job have looked like a sprint. Franco's last six years ...

  17. Helping from the Ground Up | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helping from the Ground Up Researchers used Argonne's Materials Engineering Research Facility to analyze and develop lithium carbonate to meet lithium specifications for battery applications. PDF icon lithium_carbonate

  18. Ground Breaking of Blythe Solar Power Project | Department of...

    Energy Savers [EERE]

    Breaking of Blythe Solar Power Project Ground Breaking of Blythe Solar Power Project June 20, 2011 - 2:16pm Addthis Secretary Chu Secretary Chu Former Secretary of Energy What will ...

  19. A law intern's proving ground | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A law intern's proving ... A law intern's proving ground Posted: May 7, 2014 - 5:31pm | Y-12 Report | Volume 10, Issue 2 | 2014 Eliza Scott almost didn't apply for the Y-12UT Law ...

  20. Development of mine explosion ground truth smart sensors

    SciTech Connect (OSTI)

    Taylor, Steven R.; Harben, Phillip E.; Jarpe, Steve; Harris, David B.

    2015-09-14

    Accurate seismo-acoustic source location is one of the fundamental aspects of nuclear explosion monitoring. Critical to improved location is the compilation of ground truth data sets for which origin time and location are accurately known. Substantial effort by the National Laboratories and other seismic monitoring groups have been undertaken to acquire and develop ground truth catalogs that form the basis of location efforts (e.g. Sweeney, 1998; Bergmann et al., 2009; Waldhauser and Richards, 2004). In particular, more GT1 (Ground Truth 1 km) events are required to improve three-dimensional velocity models that are currently under development. Mine seismicity can form the basis of accurate ground truth datasets. Although the location of mining explosions can often be accurately determined using array methods (e.g. Harris, 1991) and from overhead observations (e.g. MacCarthy et al., 2008), accurate origin time estimation can be difficult. Occasionally, mine operators will share shot time, location, explosion size and even shot configuration, but this is rarely done, especially in foreign countries. Additionally, shot times provided by mine operators are often inaccurate. An inexpensive, ground truth event detector that could be mailed to a contact, placed in close proximity (< 5 km) to mining regions or earthquake aftershock regions that automatically transmits back ground-truth parameters, would greatly aid in development of ground truth datasets that could be used to improve nuclear explosion monitoring capabilities. We are developing an inexpensive, compact, lightweight smart sensor unit (or units) that could be used in the development of ground truth datasets for the purpose of improving nuclear explosion monitoring capabilities. The units must be easy to deploy, be able to operate autonomously for a significant period of time (> 6 months) and inexpensive enough to be discarded after useful operations have expired (although this may not be part of our business

  1. Renewable Energy Opportunties at Dugway Proving Ground, Utah

    SciTech Connect (OSTI)

    Orrell, Alice C.; Kora, Angela R.; Russo, Bryan J.; Horner, Jacob A.; Williamson, Jennifer L.; Weimar, Mark R.; Gorrissen, Willy J.; Nesse, Ronald J.; Dixon, Douglas R.

    2010-05-31

    This document provides an overview of renewable resource potential at Dugway Proving Ground, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and ground source heat pumps (GSHPs). The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment.

  2. Deputy Secretary Poneman Attends Ground Breaking at Tennessee Advanced

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Battery Plant | Department of Energy Attends Ground Breaking at Tennessee Advanced Vehicle Battery Plant Deputy Secretary Poneman Attends Ground Breaking at Tennessee Advanced Vehicle Battery Plant May 26, 2010 - 12:00am Addthis Smyrna, TN - Today, U.S. Deputy Secretary of Energy Daniel Poneman participated in the groundbreaking ceremony for Nissan North America's advanced battery manufacturing facility in Smyrna, Tennessee. This past January the Department closed a $1.4 billion loan

  3. Energy Department Training Breaks New Ground | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Breaks New Ground Energy Department Training Breaks New Ground December 3, 2013 - 1:00pm Addthis The Federal Energy Management Program is now an authorized provider of continuing education units from the International Association for Continuing Education and Training. Watch the video above to learn more. Timothy Unruh Timothy Unruh FEMP Director High quality education for federal government employees helps streamline operations, improve services, and ensure that taxpayer dollars are

  4. EERE Success Story-Indiana Manufacturing Institute Breaks Ground at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purdue University in support of Composites Manufacturing Research | Department of Energy Indiana Manufacturing Institute Breaks Ground at Purdue University in support of Composites Manufacturing Research EERE Success Story-Indiana Manufacturing Institute Breaks Ground at Purdue University in support of Composites Manufacturing Research July 14, 2015 - 1:16pm Addthis Left: Gary Bertoline, Dean of Purdue Polytechnic Institute; Kelly Visconti, Technology Manager for the U.S. Department of

  5. Engineering characterization of ground motion. Task II. Observational data on spatial variations of earthquake ground motion. Volume 3

    SciTech Connect (OSTI)

    Chang, C.Y.; Power, M.S.; Idriss, I.M.; Somerville, P.G.; Silva, W.; Chen, P.C.

    1986-02-01

    This report presents the results of part of a two-task study on the engineering characterization of earthquake ground motion for nuclear power plant design. The overall objective of this research program sponsored by the US Nuclear Regulatory Commission (USNRC) is to develop recommendations for methods for selecting design response spectra or acceleration time histories to be used to characterize motion at the foundation level of nuclear power plants. Volume 3 presents observational data on spatial variations of earthquake ground motion.

  6. Ground-water flow and ground- and surface-water interaction at the Weldon Spring quarry, St. Charles County, Missouri

    SciTech Connect (OSTI)

    Imes, J.L.; Kleeschulte, M.J.

    1997-12-31

    Ground-water-level measurements to support remedial actions were made in 37 piezometers and 19 monitoring wells during a 19-month period to assess the potential for ground-water flow from an abandoned quarry to the nearby St. Charles County well field, which withdraws water from the base of the alluvial aquifer. From 1957 to 1966, low-level radioactive waste products from the Weldon Spring chemical plant were placed in the quarry a few hundred feet north of the Missouri River alluvial plain. Uranium-based contaminants subsequently were detected in alluvial ground water south of the quarry. During all but flood conditions, lateral ground-water flow in the bedrock from the quarry, as interpreted from water-table maps, generally is southwest toward Little Femme Osage Creek or south into the alluvial aquifer. After entering the alluvial aquifer, the ground water flows southeast to east toward a ground-water depression presumably produced by pumping at the St. Charles County well field. The depression position varies depending on the Missouri River stage and probably the number and location of active wells in the St. Charles County well field.

  7. Hanford Site ground-water monitoring for 1993

    SciTech Connect (OSTI)

    Dresel, P.E.; Luttrell, S.P.; Evans, J.C.

    1994-09-01

    This report presents the results of the Ground-Water Surveillance Project monitoring for calendar year 1993 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that have impacted ground-water quality on the Site. Monitoring of water levels and ground-water chemistry is performed to track the extent of contamination and trends in contaminant concentrations. The 1993 monitoring was also designed to identify emerging ground-water quality problems. The information obtained is used to verify compliance with applicable environmental regulations and to evaluate remedial actions. Data from other monitoring and characterization programs were incorporated to provide an integrated assessment of Site ground-water quality. Additional characterization of the Site`s geologic setting and hydrology was performed to support the interpretation of contaminant distributions. Numerical modeling of sitewide ground-water flow also supported the overall project goals. Water-level monitoring was performed to evaluate ground-water flow directions, to track changes in water levels, and to relate such changes to changes in site disposal practices. Water levels over most of the Hanford Site continued to decline between June 1992 and June 1993. The greatest declines occurred in the 200-West Area. These declines are part of the continued response to the cessation of discharge to U Pond and other disposal facilities. The low permeability in this area which enhanced mounding of waste-water discharge has also slowed the response to the reduction of disposal. Water levels remained nearly constant in the vicinity of B Pond, as a result of continued disposal to the pond. Water levels measured from wells in the unconfined aquifer north and east of the Columbia River indicate that the primary source of recharge is irrigation practices.

  8. Uranium isotopes in ground water as a prospecting technique

    SciTech Connect (OSTI)

    Cowart, J.B.; Osmond, J.K.

    1980-02-01

    The isotopic concentrations of dissolved uranium were determined for 300 ground water samples near eight known uranium accumulations to see if new approaches to prospecting could be developed. It is concluded that a plot of /sup 234/U//sup 238/U activity ratio (A.R.) versus uranium concentration (C) can be used to identify redox fronts, to locate uranium accumulations, and to determine whether such accumulations are being augmented or depleted by contemporary aquifer/ground water conditions. In aquifers exhibiting flow-through hydrologic systems, up-dip ground water samples are characterized by high uranium concentration values (> 1 to 4 ppB) and down-dip samples by low uranium concentration values (less than 1 ppB). The boundary between these two regimes can usually be identified as a redox front on the basis of regional water chemistry and known uranium accumulations. Close proximity to uranium accumulations is usually indicated either by very high uranium concentrations in the ground water or by a combination of high concentration and high activity ratio values. Ground waters down-dip from such accumulations often exhibit low uranium concentration values but retain their high A.R. values. This serves as a regional indicator of possible uranium accumulations where conditions favor the continued augmentation of the deposit by precipitation from ground water. Where the accumulation is being dispersed and depleted by the ground water system, low A.R. values are observed. Results from the Gulf Coast District of Texas and the Wyoming districts are presented.

  9. Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002...

    Open Energy Info (EERE)

    Ground Gravity Survey At Cove Fort Area (Warpinski, Et Al., 2002) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Cove...

  10. Ground Gravity Survey At Hot Pot Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At Hot Pot Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Hot Pot Area (DOE GTP)...

  11. Ground Gravity Survey At Fort Bliss Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Fort Bliss Area (DOE...

  12. Ground Gravity Survey At New River Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At New River Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At New River Area (DOE...

  13. Proceedings of the 27th Seismic Research Review: Ground-Based...

    Office of Scientific and Technical Information (OSTI)

    Ground-Based Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: Proceedings of the 27th Seismic Research Review: Ground-Based Nuclear Explosion ...

  14. Proceedings of the 28th Seismic Research Review: Ground-Based...

    Office of Scientific and Technical Information (OSTI)

    Ground-Based Nuclear Explosion Monitoring Technologies Citation Details In-Document Search Title: Proceedings of the 28th Seismic Research Review: Ground-Based Nuclear Explosion ...

  15. Ground Gravity Survey At Glass Buttes Area (DOE GTP) | Open Energy...

    Open Energy Info (EERE)

    Ground Gravity Survey At Glass Buttes Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Ground Gravity Survey At Glass Buttes Area...

  16. Performance of a hybrid ground-coupled heat pump system

    SciTech Connect (OSTI)

    Phetteplace, G.; Sullivan, W.

    1998-10-01

    In climates dominated by air conditioning, a few so-called hybrid ground-coupled heat pump (GCHP) systems have been built. The hybrid system uses both a ground-coupled heat exchanger and a cooling tower, thereby reducing the amount of ground-coupling heat exchanger necessary. Although this concept has been shown to be feasible, the performance of such a system has not been measured in detail. Since it may be possible to achieve significant performance improvements in such systems by modifying the design and operational practices, detailed performance monitoring of such systems is needed. This paper describes a project that has been undertaken to collect performance data from a hybrid GCHP system at Fort Polk, LA. This paper presents performance data for a period of about 22 months, including data from portions of two heating and cooling seasons. The energy input to the GCHPs themselves will be presented, as well as the energy rejected to the ground in the cooling mode and that extracted from the ground in the heating mode. Energy flows in the cooling tower also will be addressed, along with the power consumption of the circulating pumps and the cooling tower.

  17. Transient performance of substation structures and associated grounding systems

    SciTech Connect (OSTI)

    Dawalibi, F.P.; Xiong, W.; Ma, J.

    1995-05-01

    When lightning strikes an electric substation, large currents generated by the stroke flow in the above ground structures and grounding system and dissipate in the soil. The electromagnetic fields generated by such high currents may cause damage to equipment and may be dangerous to personnel working nearby. In this paper, the frequency and time domain performance of a substation subjected to a lightning strike is described and discussed. The computed scalar potentials, electric fields, and magnetic fields are presented graphically as a function of spatial coordinates, as a function of time and as a function of both. Two cases are considered. The first case examines the substation grounding system only, while the second case includes an above-ground structure as well. It is believed that the results of the second case have not been published before. A double exponential lightning surge current is injected at one corner of the substation. The response of the grounding system to the frequency domain electromagnetic spectrum of this signal is computed by a frequency domain electromagnetic field analysis software package. The temporal and spatial distributions of the electromagnetic fields inside and near the substation are obtained by an inverse Fourier transformation of all these responses. The presence of a soil with an arbitrary resistivity and permittivity is accurately taken into account. The analysis sheds some new light on the understanding of the effects which take place at the higher frequencies.

  18. AMS Ground Truth Measurements: Calibration and Test Lines

    SciTech Connect (OSTI)

    Wasiolek, P.

    2013-11-01

    Airborne gamma spectrometry is one of the primary techniques used to define the extent of ground contamination after a radiological incident. Its usefulness was demonstrated extensively during the response to the Fukushima nuclear power plant (NPP) accident in March-May 2011. To map ground contamination a set of scintillation detectors is mounted on an airborne platform (airplane or helicopter) and flown over contaminated areas. The acquisition system collects spectral information together with the aircraft position and altitude every second. To provide useful information to decision makers, the count rate data expressed in counts per second (cps) needs to be converted to the terrestrial component of the exposure rate 1 m above ground, or surface activity of isotopes of concern. This is done using conversion coefficients derived from calibration flights. During a large scale radiological event, multiple flights may be necessary and may require use of assets from different agencies. However, as the production of a single, consistent map product depicting the ground contamination is the primary goal, it is critical to establish very early into the event a common calibration line. Such a line should be flown periodically in order to normalize data collected from different aerial acquisition systems and potentially flown at different flight altitudes and speeds. In order to verify and validate individual aerial systems, the calibration line needs to be characterized in terms of ground truth measurements. This is especially important if the contamination is due to short-lived radionuclides. The process of establishing such a line, as well as necessary ground truth measurements, is described in this document.

  19. Characterizing Photometric Flicker Test-sample Data Spreadsheet

    Energy Savers [EERE]

    Test Source Dim State MATLAB Assigned FFF METER FFF MATLAB Percent Flicker METER Percent Flicker MATLAB Flicker Index METER Flicker Index Frequency Response Waveform MATLAB ...

  20. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    200,000 Davenport IA IA-001 100,827 200,000 Delray Beach FL FL-022 64,092 130,000 Durango CO CO-003 16,416 58,500 Flint MI MI-005 112,900 199,814 Fort Wayne IN IN-003 251,591 ...

  1. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Organization Recovery Act Funding PJM Interconnection, LLC $16,000,000 The National Association of Regulatory Utility Commissioners (NARUC) $14,000,000 Western Electricity Coordinating Council $14,500,000 Western Governors' Association $12,000,000 Electric Reliability Council of Texas (ERCOT) $2,500,000 Electric Reliability Council of Texas (ERCOT) for work with Texas government agencies $1,000,000 Interconnection Transmission Planning Eastern Interconnection Western

  2. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    City HQ State Congressional District(s) Population Recovery Act Funding* Asheville ** NC NC-011 500,000 $209,940 Aspen CO CO-003 5,902 $59,193 Aurora CO CO-007 319,057 $151,800 Baltimore MD MD-002 636,919 $200,000 Baton Rouge LA LA-6 223,689 $200,000 Boston MA MA-009 609,023 $300,000 Casper WY WY-001 54,047 $130,000 Chicago IL IL-005 2,853,114 $300,000 Chula Vista CA CA-051 219,318 $200,000 City and County of Denver CO CO-001 598,707 $210,040 Columbia MO MO-009 100,733 $200,000 Davenport IA

  3. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Funding* Alabama $627,742 Arizona $796,410 Arkansas $461,990 California $3,572,526 Colorado $653,209 Connecticut $521,250 Delaware $280,109 District of Columbia $254,302 Florida $1,881,676 Georgia $1,088,694 Hawaii $318,196 Idaho $339,814 Iowa $475,493 Illinois $1,383,754 Indiana $785,088 Kentucky $591,715 Louisiana $604,703 Maine $320,789 Maryland $716,898 Massachusetts $796,207 Michigan $1,117,842 Minnesota $678,986 Mississippi $469,626 Missouri $742,406 Montana $288,765 Nebraska

  4. Appendices and Risk Assessment Spreadsheet Version No. Fermi...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The lead engineer will determine the degree of oversight you will need using a risk-based graded approach. On other occasions you will do design work as a member of a...

  5. Wind for Schools Funding Spreadsheet | Open Energy Information

    Open Energy Info (EERE)

    search Wind for Schools Portal Home Comparison Motion Chart Educational Resources Turbine Support Software & Downloads Wind Industry Careers Wind for Schools Funding...

  6. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Broader source: Energy.gov (indexed) [DOE]

    469,626 Missouri 742,406 Montana 288,765 Nebraska 363,635 Nevada 438,573 New Hampshire 320,729 New Jersey 996,658 New Mexico 382,070 New York 1,988,289 North ...

  7. Project Award Spreadsheets 2010 12 21 1232.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Governors' Association 12,000,000 Electric Reliability Council of Texas (ERCOT) 2,500,000 Electric Reliability Council of Texas (ERCOT) for work with Texas government ...

  8. 1991 Tables and Spreadsheets and Answers to Frequently Asked...

    U.S. Energy Information Administration (EIA) Indexed Site

    (Table A49) Relationship between Energy and Manufacturing Operations Q:How does energy consumption relate to operating costs? A: :For a review of selected operating ratios,...

  9. AVTA: Airport Ground Support Equipment Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Airport Ground Support Equipment Specifications and Test Procedures AVTA: Airport Ground Support Equipment Specifications and Test Procedures eGSE America Electric Baggage Tow Tractor (EBTT) Technical Specifications (136.16 KB) eGSE America Electric Aircraft PushBack Tractor (EAPT) Technical Specifications (85.7 KB) eGSE America Electric Aircraft Cargo Conveyor (EACC) Technical Specifications (76.64 KB) ETA-GAC001 Control, Close-out, and Storage of Documentation (76.84

  10. Effluent treatment options for nuclear thermal propulsion system ground tests

    SciTech Connect (OSTI)

    Shipers, L.R.; Brockmann, J.E.

    1992-10-16

    A variety of approaches for handling effluent from nuclear thermal propulsion system ground tests in an environmentally acceptable manner are discussed. The functional requirements of effluent treatment are defined and concept options are presented within the framework of these requirements. System concepts differ primarily in the choice of fission-product retention and waste handling concepts. The concept options considered range from closed cycle (venting the exhaust to a closed volume or recirculating the hydrogen in a closed loop) to open cycle (real time processing and venting of the effluent). This paper reviews the strengths and weaknesses of different methods to handle effluent from nuclear thermal propulsion system ground tests.

  11. Study shows tanker spills about equal from groundings and collisions

    SciTech Connect (OSTI)

    Not Available

    1992-02-17

    This paper reports that figures compiled by International Tanker Owners Pollution Federation Ltd., London, dispel the commonly held belief that tanker groundings are more significant than collisions in terms of oil pollution. During the past 21 years, the number of spills and volumes released after collisions and groundings were almost the same, the Catherine Grey, the federation's database manager. The federation the efforts to design environmentally safer tankers, such as those with double hulls, to minimize oil spills following accidents should take full account of the causes of major spills.

  12. North Village Ground Source Heat Pump Demonstration Project

    SciTech Connect (OSTI)

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  13. Jefferson Lab Breaks Ground On $310 Million Project | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breaks Ground On $310 Million Project Jefferson Lab Breaks Ground On $310 Million Project groundbreaking Newport News Mayor Joe Frank addresses the crowd at the groundbreaking ceremony for the Jefferson Lab 12 GeV Upgrade. Also on the stage are (front row, l-r) U.S. Rep. Rob Wittman of Virginia's 1st District; U.S. Rep. Bobby Scott of Virginia's 3rd District; Gene Henry, Associate Director of the DOE's Office of Science for Nuclear Physics; Jefferson Lab Director Hugh Montgomery; (back row, l-r)

  14. Experience with the ground test accelerator beam-measurement instrumentation

    SciTech Connect (OSTI)

    Gilpatrick, J.D.; Johnson, K.F.; Connolly, R.C.; Power, J.F.; Rose, C.R.; Sander, O.R.; Shafer, R.E.; Sandoval, D.P.; Yuan, V.W. )

    1994-10-10

    During the past two years, the Ground Test Accelerator (GTA) has used a variety of off- and on-line beam diagnostic measurements to understand and verify the transverse and longitudinal phase space characteristics of a 35-mA, low-energy (2.5- to 3.2-MeV) H[sup [minus

  15. Uranium in US surface, ground, and domestic waters. Volume 2

    SciTech Connect (OSTI)

    Drury, J.S.; Reynolds, S.; Owen, P.T.; Ross, R.H.; Ensminger, J.T.

    1981-04-01

    The report Uranium in US Surface, Ground, and Domestic Waters comprises four volumes. Volumes 2, 3, and 4 contain data characterizing the location, sampling date, type, use, and uranium conentrations of 89,994 individual samples presented in tabular form. The tabular data in volumes 2, 3, and 4 are summarized in volume 1 in narrative form and with maps and histograms.

  16. Cleanup Verification Package for the 118-F-6 Burial Ground

    SciTech Connect (OSTI)

    H. M. Sulloway

    2008-10-02

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car.

  17. Nuclear ground-state masses and deformations: FRDM(2012)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Moller, P.; Sierk, A. J.; Ichikawa, T.; Sagawa, H.

    2016-03-25

    Here, we tabulate the atomic mass excesses and binding energies, ground-state shell-plus-pairing corrections, ground-state microscopic corrections, and nuclear ground-state deformations of 9318 nuclei ranging from 16O to A=339. The calculations are based on the finite-range droplet macroscopic and the folded-Yukawa single-particle microscopic nuclear-structure models, which are completely specified. Relative to our FRDM(1992) mass table in Möller et al. (1995), the results are obtained in the same model, but with considerably improved treatment of deformation and fewer of the approximations that were necessary earlier, due to limitations in computer power. The more accurate execution of the model and the more extensivemore » and more accurate experimental mass data base now available allow us to determine one additional macroscopic-model parameter, the density-symmetry coefficient LL, which was not varied in the previous calculation, but set to zero. Because we now realize that the FRDM is inaccurate for some highly deformed shapes occurring in fission, because some effects are derived in terms of perturbations around a sphere, we only adjust its macroscopic parameters to ground-state masses.« less

  18. GWVis: A Tool for Comparative Ground-Water Data Visualization

    SciTech Connect (OSTI)

    Best, Daniel M.; Lewis, Robert R.

    2010-11-01

    The Ground-Water Visualization application (GWVis) presents ground-water data visually in order to educate the public on ground-water issues. It is also intended for presentations to government and other funding agencies. Current three dimensional models of ground-water are overly complex, while the two dimensional representations (i.e., on paper) are neither comprehensive, nor engaging. At present, GWVis operates on water head elevation data over a given time span, together with a matching (fixed) underlying geography. Two elevation scenarios are compared with each other, typically a control data set (actual field data) and a simulation. Scenario comparison can be animated for the time span provided. We developed GWVis using the Python programming language, associated libraries, and pyOpenGL extension packages to improve performance and control of attributes of the mode (such as color, positioning, scale, and interpolation). GWVis bridges the gap between two dimensional and dynamic three dimensional research visualizations by providing an intuitive, interactive design that allows participants to view the model from different perspectives and to infer information about scenarios. By incorporating scientific data in an environment that can be easily understood, GWVis allows the information to be presented to a large audience base.

  19. EECBG Success Story: Breaking Ground in Miami-Dade

    Broader source: Energy.gov [DOE]

    Officials from Miami-Dade County and the U.S. Department of Energy were on hand Wednesday, October 13th to formally break ground on an innovative project that will help improve the energy efficiency of one of the county’s major water treatment facilities. Learn more.

  20. Vertical Distribution of Contamination in Ground Water at the Tuba City,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arizona, Site | Department of Energy Vertical Distribution of Contamination in Ground Water at the Tuba City, Arizona, Site Vertical Distribution of Contamination in Ground Water at the Tuba City, Arizona, Site Vertical Distribution of Contamination in Ground Water at the Tuba City, Arizona, Site Vertical Distribution of Contamination in Ground Water at the Tuba City, Arizona, Site (7.2 MB) More Documents & Publications Diffusion Multilayer Sampling of Ground Water in Five Wells at the

  1. Using malaise traps to sample ground beetles (Coleoptera. Carabidae)

    SciTech Connect (OSTI)

    Ulyshen, Michael D.; Hanula, James L.; Horn, Scott

    2012-04-02

    Pitfall traps provide an easy and inexpensive way to sample ground-dwelling arthropods (Spence and Niemela 1994; Spence et al. 1997; Abildsnes and Tommeras 2000) and have been used exclusively in many studies of the abundance and diversity of ground beetles (Coleoptera: Carabidae). Despite the popularity of this trapping technique, pitfall traps have many disadvantages. For example, they often fail to collect both small (Spence and Niemela 1994) and trap-shy species (Benest 1989), eventually deplete the local carabid population (Digweed et al. 1995), require a species to be ground-dwelling in order to be captured (Liebherr and Mahar 1979), and produce different results depending on trap diameter and material, type of preservative used, and trap placement (Greenslade 1964; Luff 1975; Work et al. 2002). Further complications arise from seasonal patterns of movement among the beetles themselves (Maelfait and Desender 1990), as well as numerous climatic factors, differences in plant cover, and variable surface conditions (Adis 1979). Because of these limitations, pitfall trap data give an incomplete picture of the carabid community and should be interpreted carefully. Additional methods, such as use of Berlese funnels and litter washing (Spence and Niemela 1994), collection from lights (Usis and MacLean 1998), and deployment of flight intercept devices (Liebherr and Mahar 1979; Paarmann and Stork 1987), should be incorporated in surveys to better ascertain the species composition and relative numbers of ground beetles. Flight intercept devices, like pitfall traps, have the advantage of being easy to use and replicate, but their value to carabid surveys is largely unknown. Here we demonstrate the effectiveness of Malaise traps for sampling ground beetles in a bottomland hardwood forest.

  2. Evaluation of Bare Ground on Rangelands using Unmanned Aerial Vehicles

    SciTech Connect (OSTI)

    Robert P. Breckenridge; Maxine Dakins

    2011-01-01

    Attention is currently being given to methods that assess the ecological condition of rangelands throughout the United States. There are a number of different indicators that assess ecological condition of rangelands. Bare Ground is being considered by a number of agencies and resource specialists as a lead indicator that can be evaluated over a broad area. Traditional methods of measuring bare ground rely on field technicians collecting data along a line transect or from a plot. Unmanned aerial vehicles (UAVs) provide an alternative to collecting field data, can monitor a large area in a relative short period of time, and in many cases can enhance safety and time required to collect data. In this study, both fixed wing and helicopter UAVs were used to measure bare ground in a sagebrush steppe ecosystem. The data were collected with digital imagery and read using the image analysis software SamplePoint. The approach was tested over seven different plots and compared against traditional field methods to evaluate accuracy for assessing bare ground. The field plots were located on the Idaho National Laboratory (INL) site west of Idaho Falls, Idaho in locations where there is very little disturbance by humans and the area is grazed only by wildlife. The comparison of fixed-wing and helicopter UAV technology against field estimates shows good agreement for the measurement of bare ground. This study shows that if a high degree of detail and data accuracy is desired, then a helicopter UAV may be a good platform. If the data collection objective is to assess broad-scale landscape level changes, then the collection of imagery with a fixed-wing system is probably more appropriate.

  3. Using malaise traps to sample ground beetles (Coleoptera: Carabidae).

    SciTech Connect (OSTI)

    Ulyshen, Michael D., James L. Hanula, and Scott Horn

    2005-01-01

    Pitfall traps provide an easy and inexpensive way to sample ground-dwelling arthropods (Spence and Niemela 1994; Spence et al. 1997; Abildsnes and Tommeras 2000) and have been used exclusively in many studies of the abundance and diversity of ground beetles (Coleoptera: Carabidae). Despite the popularity of this trapping technique, pitfall traps have many disadvantages. For example, they often fail to collect both small (Spence and Niemela 1994) and ? ????trap-shy?¢??? species (Benest 1989), eventually deplete the local carabid population (Digweed et al. 1995), require a species to be ground-dwelling in order to be captured (Liebherr and Mahar 1979), and produce different results depending on trap diameter and material, type of preservative used, and trap placement (Greenslade 1964; Luff 1975; Work et al. 2002). Further complications arise from seasonal patterns of movement among the beetles themselves (Maelfait and Desender 1990), as well as numerous climatic factors, differences in plant cover, and variable surface conditions (Adis 1979). Because of these limitations, pitfall trap data give an incomplete picture of the carabid community and should be interpreted carefully. Additional methods, such as use of Berlese funnels and litter washing (Spence and Niemela 1994), collection from lights (Usis and MacLean 1998), and deployment of flight intercept devices (Liebherr and Mahar 1979; Paarmann and Stork 1987), should be incorporated in surveys to better ascertain the species composition and relative numbers of ground beetles. Flight intercept devices, like pitfall traps, have the advantage of being easy to use and replicate, but their value to carabid surveys is largely unknown. Here we demonstrate the effectiveness of Malaise traps for sampling ground beetles in a bottomland hardwood forest.

  4. A Guide for Using the Transient Ground-Water Flow Model of the Death Valley Regional Ground-Water Flow System, Nevada and California

    SciTech Connect (OSTI)

    Joan B. Blainey; Claudia C. Faunt, and Mary C. Hill

    2006-05-16

    This report is a guide for executing numerical simulations with the transient ground-water flow model of the Death Valley regional ground-water flow system, Nevada and California using the U.S. Geological Survey modular finite-difference ground-water flow model, MODFLOW-2000. Model inputs, including observations of hydraulic head, discharge, and boundary flows, are summarized. Modification of the DVRFS transient ground-water model is discussed for two common uses of the Death Valley regional ground-water flow system model: predictive pumping scenarios that extend beyond the end of the model simulation period (1998), and model simulations with only steady-state conditions.

  5. Peak Ground Velocities for Seismic Events at Yucca Mountain, Nevada

    SciTech Connect (OSTI)

    K. Coppersmith; R. Quittmeyer

    2005-02-16

    This report describes a scientific analysis to bound credible horizontal peak ground velocities (PGV) for the repository waste emplacement level at Yucca Mountain. Results are presented as a probability distribution for horizontal PGV to represent uncertainties in the analysis. The analysis also combines the bound to horizontal PGV with results of ground motion site-response modeling (BSC 2004 [DIRS 170027]) to develop a composite hazard curve for horizontal PGV at the waste emplacement level. This result provides input to an abstraction of seismic consequences (BSC 2004 [DIRS 169183]). The seismic consequence abstraction, in turn, defines the input data and computational algorithms for the seismic scenario class of the total system performance assessment (TSPA). Planning for the analysis is documented in Technical Work Plan TWP-MGR-GS-000001 (BSC 2004 [DIRS 171850]). The bound on horizontal PGV at the repository waste emplacement level developed in this analysis complements ground motions developed on the basis of PSHA results. In the PSHA, ground motion experts characterized the epistemic uncertainty and aleatory variability in their ground motion interpretations. To characterize the aleatory variability they used unbounded lognormal distributions. As a consequence of these characterizations, as seismic hazard calculations are extended to lower and lower annual frequencies of being exceeded, the ground motion level increases without bound, eventually reaching levels that are not credible (Corradini 2003 [DIRS 171191]). To provide credible seismic inputs for TSPA, in accordance with 10 Code of Federal Regulations (CFR) 63.102(j) [DIRS 156605], this complementary analysis is carried out to determine reasonable bounding values of horizontal PGV at the waste emplacement level for annual frequencies of exceedance as low as 10{sup -8}. For each realization of the TSPA seismic scenario, the results of this analysis provide a constraint on the values sampled from the

  6. Ground-based Nuclear Detonation Detection (GNDD) Technology Roadmap

    SciTech Connect (OSTI)

    Casey, Leslie A.

    2014-01-13

    This GNDD Technology Roadmap is intended to provide guidance to potential researchers and help management define research priorities to achieve technology advancements for ground-based nuclear explosion monitoring science being pursued by the Ground-based Nuclear Detonation Detection (GNDD) Team within the Office of Nuclear Detonation Detection in the National Nuclear Security Administration (NNSA) of the U.S. Department of Energy (DOE). Four science-based elements were selected to encompass the entire scope of nuclear monitoring research and development (R&D) necessary to facilitate breakthrough scientific results, as well as deliver impactful products. Promising future R&D is delineated including dual use associated with the Comprehensive Nuclear-Test-Ban Treaty (CTBT). Important research themes as well as associated metrics are identified along with a progression of accomplishments, represented by a selected bibliography, that are precursors to major improvements to nuclear explosion monitoring.

  7. The valence-fluctuating ground state of plutonium

    SciTech Connect (OSTI)

    Janoschek, Marc; Das, Pinaki; Chakrabarti, Bismayan; Abernathy, Douglas L.; Lumsden, Mark D.; Lawrence, John M.; Thompson, Joe D.; Lander, Gerard H.; Mitchell, Jeremy N.; Richmond, Scott; Ramos, Mike; Trouw, Frans; Zhu, Jian -Xin; Haule, Kristjan; Kotliar, Gabriel; Bauer, Eric D.

    2015-07-10

    A central issue in material science is to obtain understanding of the electronic correlations that control complex materials. Such electronic correlations frequently arise because of the competition of localized and itinerant electronic degrees of freedom. Although the respective limits of well-localized or entirely itinerant ground states are well understood, the intermediate regime that controls the functional properties of complex materials continues to challenge theoretical understanding. We have used neutron spectroscopy to investigate plutonium, which is a prototypical material at the brink between bonding and nonbonding configurations. In addition, our study reveals that the ground state of plutonium is governed by valence fluctuations, that is, a quantum mechanical superposition of localized and itinerant electronic configurations as recently predicted by dynamical mean field theory. Our results not only resolve the long-standing controversy between experiment and theory on plutonium’s magnetism but also suggest an improved understanding of the effects of such electronic dichotomy in complex materials.

  8. Monitoring and evaluating ground-source heat pump. Final report

    SciTech Connect (OSTI)

    Stoltz, S.V.; Cade, D.; Mason, G.

    1996-05-01

    This report presents the measured performance of four advanced residential ground-source heat pump (GSHP) systems. The GSHP systems were developed by WaterFurnace International to minimize the need for electric resistance backup heating and featured multiple speed compressors, supplemental water heating, and at most sites, multiple-speed fans. Detailed data collected for a complete year starting in June 1994 shows that the advanced design is capable of maintaining comfort without the use of electric resistance backup heating. In comparison with a conventional air-source heat pump, the advanced-design GSHP reduced peak heating demand by more than 12 kilowatts (kW) per residence and provided energy savings. The report describes the cooling and heating season operation of the systems, including estimated seasonal efficiency, hours of operation, and load profiles for average days and peak days. The electrical energy input, cooling output, and efficiency are presented as a function of return air temperature and ground loop temperature.

  9. Ferroelectric Switching by the Grounded Scanning Probe Microscopy Tip

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ievlev, Anton; Morozovska, A. N.; Shur, Vladimir Ya.; Kalinin, Sergei V

    2015-01-01

    The process of polarization reversal by the tip of scanning probe microscope was intensively studied for last two decades. Number of the abnormal switching phenomena was reported by the scientific groups worldwide. In particularly it was experimentally and theoretically shown that slow dynamics of the surface screening controls kinetics of the ferroelectric switching, backswitching and relaxation and presence of the charges carriers on the sample surface and in the sample bulk significantly change polarization reversal dynamics. Here we experimentally demonstrated practical possibility of the history dependent polarization reversal by the grounded SPM tip. This phenomenon was attributed to induction ofmore » the slowly dissipating charges into the surface of the grounded tip that enables polarization reversal under the action of the produced electric field. Analytical and numerical electrostatic calculations allow additional insight into nontrivial abnormal switching phenomena reported earlier.« less

  10. Ferroelectric Switching by the Grounded Scanning Probe Microscopy Tip

    SciTech Connect (OSTI)

    Ievlev, Anton; Morozovska, A. N.; Shur, Vladimir Ya.; Kalinin, Sergei V

    2015-01-01

    The process of polarization reversal by the tip of scanning probe microscope was intensively studied for last two decades. Number of the abnormal switching phenomena was reported by the scientific groups worldwide. In particularly it was experimentally and theoretically shown that slow dynamics of the surface screening controls kinetics of the ferroelectric switching, backswitching and relaxation and presence of the charges carriers on the sample surface and in the sample bulk significantly change polarization reversal dynamics. Here we experimentally demonstrated practical possibility of the history dependent polarization reversal by the grounded SPM tip. This phenomenon was attributed to induction of the slowly dissipating charges into the surface of the grounded tip that enables polarization reversal under the action of the produced electric field. Analytical and numerical electrostatic calculations allow additional insight into nontrivial abnormal switching phenomena reported earlier.

  11. SARA Cadets and Midshipmen Hit the Ground Running | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Military Academic Collaborations SARA Cadets and Midshipmen Hit the Ground Running As the U.S. military grows in technological sophistication, it is fitting that some of its future leaders are getting a four-to-six-week full-immersion experience at Los Alamos National Laboratory. This summer, through the Service Academies Research Associates (SARA) Program, the Laboratory hosted 17 cadets and midshipmen from the military academies at West Point, Annapolis,

  12. Ground movements associated with gas hydrate production. Final report

    SciTech Connect (OSTI)

    Siriwardane, H.J.; Kutuk, B.

    1992-03-01

    This report deals with a study directed towards a modeling effort on production related ground movements and subsidence resulting from hydrate dissociation. The goal of this research study was to evaluate whether there could be subsidence related problems that could be an impediment to hydrate production. During the production of gas from a hydrate reservoir, it is expected that porous reservoir matrix becomes more compressible which may cause reservoir compression (compaction) under the influence of overburden weight. The overburden deformations can propagate its influence upwards causing subsidence near the surface where production equipment will be located. In the present study, the reservoir compaction is modeled by using the conventional ``stress equilibrium`` approach. In this approach, the overburden strata move under the influence of body force (i.e. self weight) in response to the ``cavity`` generated by reservoir depletion. The present study is expected to provide a ``lower bound`` solution to the subsidence caused by hydrate reservoir depletion. The reservoir compaction anticipated during hydrate production was modeled by using the finite element method, which is a powerful computer modeling technique. The ground movements at the reservoir roof (i.e. reservoir compression) cause additional stresses and disturbance in the overburden strata. In this study, the reservoir compaction was modeled by using the conventional ``stress equilibrium`` approach. In this approach, the overburden strata move under the influence of body force (i.e. self weight) in response to the ``cavity`` generated by reservoir depletion. The resulting stresses and ground movements were computed by using the finite element method. Based on the parameters used in this investigation, the maximum ground subsidence could vary anywhere from 0.50 to 6.50 inches depending on the overburden depth and the size of the depleted hydrate reservoir.

  13. Testing of thermally enhanced cement ground heat exchanger grouts

    SciTech Connect (OSTI)

    Kavanaugh, S.P.; Allan, M.L.

    1999-07-01

    Optimal performance of closed-loop, ground-source heat pumps (ground-coupled heat pumps) is dependent upon the thermal properties of the backfill in the annual region between the ground heat exchanger (GHEX) tubes and the outer bore wall. Equally important is the protection of groundwater aquifers from contaminants that may flow from the surface of other aquifers through poorly sealed boreholes. Conventional cement and bentonite-based grouts have relatively low thermal conductivities. Loop requirements often increase beyond the allotted budget in applications where regulatory bodies require the entire heat exchanger length to be grouted. This paper reports on the results of four mixes of thermally enhanced cementitious grouts. Four grouts were evaluated in a test stand to minimize the impact of external factors typically present in field tests. The test stand accepts up to 6 in. (15 cm) ground heat exchangers in a 10 ft (3 m) test section. Controlled testing is performed in either the cooling mode (loop above 85 F [29 C]) or heating mode (loop at 32 F [0 C]), and the temperature of the outer bore wall is held constant with a groundwater source. Results indicate cement grouts that are enhanced with low-cost additives have thermal conductivities three to four times as large as conventional high-solids bentonite grouts. This would result in reduced heat exchanger lengths compared to those grouted with bentonite. There appears to be no measurable increase in overall borehole resistance due to separation of the colder tubes from the grout in the heating mode. This discussion does not include pumpability, permeability, and material handling issues, which must be thoroughly investigated before any grout can be recommended for use.

  14. LANL breaks ground on key sediment control project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sediment control project LANL breaks ground on key sediment control project Called "grade-control" structures, the approximately $2 million features are up to eight feet high and made of rocks packed tightly into wire enclosures. November 5, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics

  15. Sandia California breaks ground on new building | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) breaks ground on new building Monday, August 3, 2015 - 11:11am A groundbreaking ceremony was recently held in Livermore, Calif., for a building that will enable consolidation of "front door" activities for Sandia National Laboratories California. NNSA Blog Building 926 will house the site's human resources department and will be home of the training center for students and new hires. The new 20,000 square foot facility, funded by institutional investments,

  16. Wind Gains ground, hitting 33 GW of installed capacity

    SciTech Connect (OSTI)

    2010-06-15

    The U.S. currently has 33 GW of installed wind capacity. Wind continues to gain ground, accounting for 42 percent of new capacity additions in the US in 2008.Globally, there are now 146 GW of wind capacity with an impressive and sustained growth trajectory that promises to dominate new generation capacities in many developing countries. The U.S., however, lags many European countries, with wind providing roughly 2 percent of electricity generation.

  17. Quantitative risk of oil tanker groundings. Master`s thesis

    SciTech Connect (OSTI)

    Amrozowicz, M.D.

    1996-06-01

    The culture, design, and operation of the maritime industry all contribute to create an error-inducing system. As oil tankers have become larger, the tolerance for error has decreased as the consequences have increased. Tankers are the largest contributor by vessel type to worldwide oil spill volume. Human error has consistently been attributed to 80 percent of the marine accidents. A closer look reveals that many accidents attributed to human error are system errors. In fact, the term human error is unwarranted in many high-risk accidents and its use is a perforation of the context. The maritime industry has been identified as a high risk operation, requiring an active risk management program. A probabilistic risk assessment (PRA) provides a formal process of determining the full range of possible adverse occurrences, probabilities, and expected costs for any undesirable event. A PRA can identify those areas that offer the greatest risk-reducing potential. This thesis focuses on the first level of a proposed three-level risk model to determine the probability of a tanker grounding. The approach utilizes fault trees and event trees and incorporates The Human Error Rate Prediction data to quantify individual errors. The result allows the identification of high-leverage factors in order to determine the most effective and efficient use of resources to reduce the probability of grounding; showing that the development of the Electronic Chart Display and Information System incorporated with the International Safety Management Code can significantly reduce the probability of grounding.

  18. UMTRA Ground Water Project management action process document

    SciTech Connect (OSTI)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

  19. Ball State Completes Largest U.S. Ground-Source Geothermal System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ball State Completes Largest U.S. Ground-Source Geothermal System Ball State Completes Largest U.S. Ground-Source Geothermal System April 4, 2012 - 3:19pm Addthis Ball State ...

  20. Focal plane wavefront sensing and control for ground-based imaging...

    Office of Scientific and Technical Information (OSTI)

    Conference: Focal plane wavefront sensing and control for ground-based imaging Citation Details In-Document Search Title: Focal plane wavefront sensing and control for ground-based ...