Powered by Deep Web Technologies
Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Basewide energy systems plan, Hawthorne Army Ammunition Plant, Hawthorne, Nevada; executive summary. Final report  

SciTech Connect (OSTI)

This document is the Executive Summary of the Basewide Energy Systems Plan for the Hawthorne Army Ammunition Plant (HWAAP) at Hawthorne, Nevada. This project has been executed as a part of the Department of the Army`s Energy Engineering Analysis Program (EEAP). The overall objective of the project is to develop a systematic plan of projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan (AFEP), without decreasing the readiness posture of the Army. The Hawthorne Army Ammunition Plant is a Government Owned and Contractor Operator (GOCO) Army facility. Consequently, any reference made in this document to the Energy Conservation Investment Program (ECIP) is directly analagous to Energy Conservation and Management (ECAM). The ECAM designation pertains specifically to GOCO Army installations. All Programming Documents for projects developed from this study reference ECAM wherever ECIP is called for.

NONE

1983-03-25T23:59:59.000Z

2

army ammunitions plant: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineer Waterways Experiment Station, Vicksburg, MS. Engineering Computer Graphics Laboratory 1996 Engineering Computer Graphics Laboratory. 1996. AFastSEEP Automated Se Army...

3

army ammunition plant: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineer Waterways Experiment Station, Vicksburg, MS. Engineering Computer Graphics Laboratory 1996 Engineering Computer Graphics Laboratory. 1996. AFastSEEP Automated Se Army...

4

Energy Engineering Analysis (EEA) program for Lone Star Army Ammunition Plant, Texas. Executive summary. Final report  

SciTech Connect (OSTI)

The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army. After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. The primary mission of LSAAP is to load, assemble and pack ammunition and ammunition components for the Army.

NONE

1981-12-31T23:59:59.000Z

5

Installation restoration program: Hydrologic measurements with an estimated hydrologic budget for the Joliet Army Ammunition Plant, Joliet, Illinois. [Contains maps of monitoring well locations, topography and hydrologic basins  

SciTech Connect (OSTI)

Hydrologic data were gathered from the 36.8-mi{sup 2} Joliet Army Ammunition Plant (JAAP) located in Joliet, Illinois. Surface water levels were measured continuously, and groundwater levels were measured monthly. The resulting information was entered into a database that could be used as part of numerical flow model validation for the site. Deep sandstone aquifers supply much of the water in the JAAP region. These aquifers are successively overlain by confining shales and a dolomite aquifer of Silurian age. This last unit is unconformably overlain by Pleistocene glacial tills and outwash sand and gravel. Groundwater levels in the shallow glacial system fluctuate widely, with one well completed in an upland fluctuating more than 17 ft during the study period. The response to groundwater recharge in the underlying Silurian dolomite is slower. In the upland recharge areas, increased groundwater levels were observed; in the lowland discharge areas, groundwater levels decreased during the study period. The decreases are postulated to be a lag effect related to a 1988 drought. These observations show that fluid at the JAAP is not steady-state, either on a monthly or an annual basis. Hydrologic budgets were estimated for the two principal surface water basins at the JAAP site. These basins account for 70% of the facility's total land area. Meteorological data collected at a nearby dam show that total measured precipitation was 31.45 in. and total calculated evapotranspiration was 23.09 in. for the study period. The change in surface water storage was assumed to be zero for the annual budget for each basin. The change in groundwater storage was calculated to be 0.12 in. for the Grant Creek basin and 0. 26 in. for the Prairie Creek basin. Runoff was 7.02 in. and 7.51 in. for the Grant Creek and Prairie Creek basins, respectively. The underflow to the deep hydrogeologic system in the Grant Creek basin was calculated to be negligible. 12 refs., 17 figs., 15 tabs.

Diodato, D.M.; Cho, H.E.; Sundell, R.C.

1991-07-01T23:59:59.000Z

6

E-Print Network 3.0 - alabama army ammunition Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 4 U.S. ARMY CORPS...

7

Levelized cost-benefit analysis of proposed diagnostics for the Ammunition Transfer Arm of the US Army`s Future Armored Resupply Vehicle  

SciTech Connect (OSTI)

The US Army`s Project Manager, Advanced Field Artillery System/Future Armored Resupply Vehicle (PM-AFAS/FARV) is sponsoring the development of technologies that can be applied to the resupply vehicle for the Advanced Field Artillery System. The Engineering Technology Division of the Oak Ridge National Laboratory has proposed adding diagnostics/prognostics systems to four components of the Ammunition Transfer Arm of this vehicle, and a cost-benefit analysis was performed on the diagnostics/prognostics to show the potential savings that may be gained by incorporating these systems onto the vehicle. Possible savings could be in the form of reduced downtime, less unexpected or unnecessary maintenance, fewer regular maintenance checks. and/or tower collateral damage or loss. The diagnostics/prognostics systems are used to (1) help determine component problems, (2) determine the condition of the components, and (3) estimate the remaining life of the monitored components. The four components on the arm that are targeted for diagnostics/prognostics are (1) the electromechanical brakes, (2) the linear actuators, (3) the wheel/roller bearings, and (4) the conveyor drive system. These would be monitored using electrical signature analysis, vibration analysis, or a combination of both. Annual failure rates for the four components were obtained along with specifications for vehicle costs, crews, number of missions, etc. Accident scenarios based on component failures were postulated, and event trees for these scenarios were constructed to estimate the annual loss of the resupply vehicle, crew, arm. or mission aborts. A levelized cost-benefit analysis was then performed to examine the costs of such failures, both with and without some level of failure reduction due to the diagnostics/prognostics systems. Any savings resulting from using diagnostics/prognostics were calculated.

Wilkinson, V.K.; Young, J.M.

1995-07-01T23:59:59.000Z

8

ammunition plant baraboo: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 184 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

9

ammunition plant milan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 248 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

10

E-Print Network 3.0 - ammunition plant final Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Industrial Site Characterization: Federal Sector Summary: , ammunition...

11

DOE - Office of Legacy Management -- Iowa Army Ammunition Plant - IA 02  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are here HomeGunnison- NY 38 Rare

12

Excess Titanium from NNSA's Y-12 Plant to be Used by the Army...  

National Nuclear Security Administration (NNSA)

Excess Titanium from NNSA's Y-12 Plant to be Used by the Army for New Generation of Protective Body Armor for Combat Troops | National Nuclear Security Administration Facebook...

13

E-Print Network 3.0 - ammunition plant joliet Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Giordano Mion JEL Codes : C21, L11, R12, R30, R34 Keywords... : Concentration, spatial auto-correlation, plant size. CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE - COLE...

14

Energy Conservation in Army Industrial Facilities  

E-Print Network [OSTI]

-tank ammunition, high explosive filled missile warheads, fuses, demolition blocks and detonators. The plant has four load, assemble, and pack (LAP) production lines, all of which are currently active, and an active ammunition renovation plant. lAAP consumes...

Aveta, G. A.; Sliwinski, B. J.

1984-01-01T23:59:59.000Z

15

E-Print Network 3.0 - army engineer waterways Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experiment Station Aquatic Plant Control... for Control of Hydrilla by Michael D. Netherland, Judy F. Shearer U.S. Army Corps of Engineers Waterways... .S. Army Engineer ......

16

Feasibility of white-rot fungi for biodegradation of PCP-treated ammunition boxes. Final report  

SciTech Connect (OSTI)

Millions of pounds of wood ammunition boxes treated with the wood preservative pentachiorophenol (PCP) are being stockpiled at military installations, primarily depots, because cost-effective disposal is not readily available. The Army needs cost-effective and environmentally benign treatment methods for destruction and disposal of PCP-treated wood products. This research investigated the use of white-rot fungi to biodegrade PCP-treated wood. Results showed that white-rot fungi effectively decreased the PCP concentration in contaminated hardwood and softwood chips. Under ideal laboratory conditions the fungi reduced the PCP concentration by 80 percent; a field study showed only a 30 percent decrease in PCP concentration. Despite this disparity, this study demonstrated the feasibility of using white-rot fungi to reduce PCP in treated wood.

Scholze, R.J.; Lamar, R.T.; Bolduc, J.; Dietrich, D.

1995-01-01T23:59:59.000Z

17

China's Dream Army  

E-Print Network [OSTI]

s Liberation Army (PLA) power projection capabilities. The “a strong military. 10 The PLA’s “Strong Army Dream” (???)the sole purview of the PLA Navy, however. General Armament

MILLER, Joseph

2013-01-01T23:59:59.000Z

18

ARMY Energy Security Considerations  

E-Print Network [OSTI]

ARMY Energy Security Considerations Don Juhasz, PE, CEM HQDA, OACSIM, DAIM-FDF Telephone: (703-FDF (703) 601-0374 (DSN 329) / don.juhasz@hqda.army.mil 5 April 2007 Army Energy · · · · FOREIGN OIL 2 Situation OIL & GAS LIQUIDS 38% Rise in NTV Fuel Use 35% of DoD utilities 21% of Fed government 11

19

Miscellaneous Paper A-95-1 US Army Corps  

E-Print Network [OSTI]

Induced Stress in Submerse ·Aquatic Plants: A Review by Susan L. Sprecher, Michael D. Netherland in Submersed Aquatic Plants: A Review by Susan L. Sprecher, Michael D. Netherland U.S. Army Corps of Engineers. Netherland; pre pared for U.S. Army Corps of Engineers. 41 p. : ill. ; 28 em. - (Miscellaneous paper; A-95

US Army Corps of Engineers

20

ERDCTR-14-2 Army Net Zero Program  

E-Print Network [OSTI]

ERDCTR-14-2 Army Net Zero Program Composting Assessment for Organic Solid Waste at Fort Polk://acwc.sdp.sirsi.net/client/default. #12;Army Net Zero Program ERDC TR-14-2 April 2014 Composting Assessment for Organic Solid Waste for recycling), damaged wood pallets, and sludge from the wastewater treatment plants. Waste records from Ft

US Army Corps of Engineers

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Crusader Automated Docking System: Technology support for the Crusader Resupply Team. Interim report, Ammunition Logistics Program  

SciTech Connect (OSTI)

The US Army and Team Crusader (United Defense, Lockheed Martin Armament Systems, etc.) are developing the next generation howitzer, the Crusader. The development program includes an advanced, self-propelled liquid propellant howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and replenish ammunition, fuel, and other material. The Army has recommended that Crusader incorporate new and innovative technologies to improve performance and safety. One conceptual design proposes a robotic resupply boom on the resupply vehicle to upload supplies to the howitzer. The resupply boom would normally be retracted inside the resupply vehicle during transit. When the two vehicles are within range of the resupply boom, the boom would be extended to a receiving port on the howitzer. In order to reduce exposure to small arms fire or nuclear, biological, and chemical hazards, the crew would remain inside the resupply vehicle during the resupply operation. The process of extending the boom and linking with the receiving port is called docking. A boom operator would be designated to maneuver the boom into contact with the receiving port using a mechanical joystick. The docking operation depends greatly upon the skill of the boom operator to manipulate the boom into docking position. Computer simulations at the National Aeronautics and Space Administration have shown that computer-assisted or autonomous docking can improve the ability of the operator to dock safely and quickly. This document describes the present status of the Crusader Autonomous Docking System (CADS) implemented at Oak Ridge National laboratory (ORNL). The purpose of the CADS project is to determine the feasibility and performance limitations of vision systems to satisfy the autonomous docking requirements for Crusader and conduct a demonstration under controlled conditions.

Kring, C.T.; Varma, V.K.; Jatko, W.B.

1995-11-01T23:59:59.000Z

22

Making the Connection: Beneficial Collaboration Between Army...  

Broader source: Energy.gov (indexed) [DOE]

Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies Making the Connection: Beneficial Collaboration Between Army Installations and...

23

E-Print Network 3.0 - ammunition Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or storage container. Ammunition will not be stored Source: Texas A&M University, Spatial Sciences Laboratory Collection: Geosciences 57 Imaging of the atmosphere with...

24

Letterkenny Army Depot: The Army Teaches Business a Lesson in Lean Six Sigma  

E-Print Network [OSTI]

Letterkenny Army Depot: The Army Teaches Business a Lesson in Lean Six Sigma is a case study of Letterkenny Army Depot, one of five Army maintenance depots. Letterkenny recapitalizes missiles, HMMWV's, generators, and other ...

Harvey, Roger K.

2006-05-23T23:59:59.000Z

25

Idaho_Army  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinementEtching. | EMSLtheIndustryMitch Arkoosh SiteMtn. Home Army

26

ARMY SERVICE FORCES  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r. aw wL2--\ AP R 2 2ARMY

27

Army High Performance Computing Research Center  

E-Print Network [OSTI]

Army High Performance Computing Research Center Applying advanced computational science research challenges http://me.stanford.edu/research/centers/ahpcrc #12;Army High Performance Computing challenges http://me.stanford.edu/research/centers/ahpcrc #12;Army High Performance Computing Research

Prinz, Friedrich B.

28

Army Energy Security and Independence  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers oil field forecasts; U.S. Army's energy and water strategy for installations; renewable energy projects; net zero energy installations; and the Army's renewable energy program.

29

US Army Corps of Engineers  

E-Print Network [OSTI]

. Netherland, WES David Sisneros, U.S. Bureau of Reclamation Alison M. Fox, William T. Hailer, University Liquid and Slow-Release Pellet Applications by Michael D. Netherland U.S. Army Corps of Engineers / by Michael D. Netherland ... [et al.]; prepared for U.S. Army Corps of Engineers. 64p. : ill. ; 28 cm

US Army Corps of Engineers

30

Miscellaneous Paper A-97-2 I!Ius Army Corps  

E-Print Network [OSTI]

Accomplishments by Kurt D. Getsinger, Michael D. Netherland Plants: Summary of Research Accomplishments by Kurt D. Getsinger, Michael D. Netherland U.S. Army Corps / by Kurt D. Getsinger, Michael D. Netherland ; prepared for U.S. Army Corps ofEngineers. 22 p. : ill. ; 28

US Army Corps of Engineers

31

Army Industrial, Landscaping, and Agricultural Water Use  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory conducted a task for the Deputy Assistant Secretary of the Army to quantify the Army’s ILA water use and to help improve the data quality and installation water reporting in the Army Energy and Water Reporting System.

McMordie Stoughton, Kate; Loper, Susan A.; Boyd, Brian K.

2014-09-18T23:59:59.000Z

32

Army Policy Guidance for UESCs  

Broader source: Energy.gov [DOE]

Presentation—given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting—provides an overview of the U.S. Army's utility energy service contract (UESC) program and its UESC draft policy guidance.

33

Salvation Army : the next generation  

E-Print Network [OSTI]

The Salvation Army thrift stores are retail entities in the center of neighborhoods which collect and resell used objects. Although historically dear to many, it seems that the physical condition, market visibility, and ...

Francpourmoi, Salomé

2010-01-01T23:59:59.000Z

34

E-Print Network 3.0 - army environmental remediation Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Dallas... of the 100-year Levee Remediation Plan, which is a part of the overall work on which the ... Source: US Army Corps of Engineers - Aquatic Plant Control Research...

35

Department of the Army Letterhead  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix U.S. Department of|AL 2010-07ARMY US ARMY PUBLIC HEALTH

36

Sustainability: Preserving Choice for the Army  

E-Print Network [OSTI]

Sustainability: Preserving Choice for the Army Friday, October 19, 2012 12:00 - 1:30 p.m. (lunch will be provided) Wrigley Hall, Room 481 Richard Kidd Deputy Assistant of the Army, Energy and Sustainability infrastructure. The development of Army-wide sustainability principles coupled with investments, training

Hall, Sharon J.

37

US Army Corps of Engineersr~,  

E-Print Network [OSTI]

-United States-Interviews. 3. Water resources development-Government policy-United States-History-Sources. I individuals who have influenced United States water resources development. I commend this interview to allAwareness: The United States Army Corps of Engineers Environmental Advisory Board, 19704980, Reshaping National Water

US Army Corps of Engineers

38

ARMY VEHICLE DURABILITY OPTIMIZATION & RELIABILITY  

E-Print Network [OSTI]

ARMY VEHICLE DURABILITY OPTIMIZATION & RELIABILITY How to Optimize the Vehicle Design to Minimize/Reduce the Weight? Under These Uncertainties, How to Achieve Component Level Reliability? Under These Uncertainties, How to Achieve System Level Reliability? Dynamics Analysis FE Model System Model Dynamic Stress

Kusiak, Andrew

39

Supplementary documentation for an Environmental Impact Statement regarding the Pantex Plant: long-term radiological risk assessment for postulated accidents  

SciTech Connect (OSTI)

This report documents work performed in support of preparation of an Environmental Impact Statement regarding the Department of Energy's (DOE) Pantex Plant near Amarillo, Texas. The long-term health effects to people farming the areas studied by Wenzel in 1982 are calculated in this report by predicting plutonium transport in the Texas Panhandle, southeastern Iowa, and south central Washington using the BIOTRAN model. Inhalation and ingestion radiation doses are calculated for each hypothetical accident with releases of 120-, 30-, and 0.625-kg plutonium at the Pantex Plant and the Iowa Army Ammunition Plant (IAAP). The greatest radiation dose for the Pantex Plant and IAAP accidents is the inhalation dose, which accounts for greater than 90% of the long-term effect. Only a 0.625-kg plutonium release is addressed for the Hanford site. Deposited PuO/sub 2/ at levels greater than 0.4 ..mu..Ci/m/sup 2/ dose not extend offsite. Therefore, health effects were not calculated for Hanford. The estimated number of health effects (cancer deaths) based on 1990 populations was higher for these accidents at the Pantex Plant than the IAAP; but the cancer mortality risk (chance/100,000) was found to be greater at the IAAP because of the larger population density closer to the IAAP.

Wenzel, W.J.; Gallegos, A.F.

1982-12-01T23:59:59.000Z

40

This publication is available at Army Knowledge Online (www.us.army.mil) and  

E-Print Network [OSTI]

­ Joint and Army Operations .......................................................... 1-1 Understanding ......................................................... 1-9 Army Network Operational Environment Operations 1. Change FMI 6-02.45, 5 July 2007, as follows: Remove expiration date. 2. FMI to expire 5 July

US Army Corps of Engineers

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Montana State University 1 Military Science -Army  

E-Print Network [OSTI]

actively seeking this qualification for potential professional employees. Army ROTC provides leadership scholarship covers tuition and fees, a specified amount for textbooks, supplies and equipment, plus

Maxwell, Bruce D.

42

Developing an Army Doctrine Publication  

E-Print Network [OSTI]

Psychology 59(5): 952-959. Lind, E. Allan, and Tyler, Tom R. 1988. The social psychology of procedural justice. New York, NY: Springer. Luecke, Richard. A., and Patterson, James G. 2008. How to become a better negotiator. 2nd ed. New York, NY: AMACOM... (e.g., “the influence Soldiers exert”) and not applicable to the development of a doctrinal techniques publication. ADP 3-0, Unified Land Operations, outlines how the Army supports and contributes to unified action, defined as “the synchronization...

Price, Judith M.R.

2013-05-17T23:59:59.000Z

43

D I G E S T Public Works  

E-Print Network [OSTI]

for DLA in Europe, by Jennifer H. Aldridge 25 Iowa Army Ammunition Plant welcomes steam plant upgrades levels pose no threat to prescribed burn program, by Dana Finney 28 Net zero offers chance for updated Insights_________________________________________________________________________ 32 Improving power supply

US Army Corps of Engineers

44

ARMY MASS TRANSPORTATION BENEFIT PROGRAM Outside the National Capital Region  

E-Print Network [OSTI]

Civilian/Mil Tech Employee Army National Guard Active Duty Enlisted II. Applicant Certification: Please

45

Energy Design Guides for Army Barracks: Preprint  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers and NREL are developing target energy budgets and design guides to achieve 30% energy savings. This paper focuses the design guide for one type of barracks called unaccompanied enlisted personal housing.

Deru, M.; Zhivov, A.; Herron, D.

2008-08-01T23:59:59.000Z

46

U.S. Army Corps of Engineers  

Broader source: Energy.gov [DOE]

Presentation covers the U.S. Army Corps of Engineers and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

47

DEPARTMENT OF THE ARMY ER 11-1-XXX U.S. Army Corps of Engineers  

E-Print Network [OSTI]

#12;DEPARTMENT OF THE ARMY ER 11-1-XXX U.S. Army Corps of Engineers CECW-EV Washington, D.C. 20314 Military Sales (FMS), and any other Federal funded programs with a total project cost of $1 million or more

US Army Corps of Engineers

48

E-Print Network 3.0 - army recruits face Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Army... of the Army (Manpower and Reserve Affairs) effective 1 October 1994. o Provides definitions of Army Civilian... Training, Education, and Development System...

49

E-Print Network 3.0 - army procurement programs Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program',. Army AL&T Magazine. Yoder, E. (2005). 'Training and Educating Contingency Contracting... Assistant Secretary of the Army, was to determine if Army procurement and...

50

E-Print Network 3.0 - army rapid equipping Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Army Pamphlet 2201 Summary: , equipping, training Army units for progressive readiness to conduct full spectrum operations across... Department of the Army Pamphlet 220-1 Field...

51

E-Print Network 3.0 - army research institute Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

search results for: army research institute Page: << < 1 2 3 4 5 > >> 1 Army High Performance Computing Research Center Summary: Army High Performance Computing Research Center...

52

E-Print Network 3.0 - army science conference Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

search results for: army science conference Page: << < 1 2 3 4 5 > >> 1 Army High Performance Computing Research Center Summary: Army High Performance Computing Research Center...

53

E-Print Network 3.0 - army airfield savannah Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

produced for Army, Air Force... Bergstrom Air Force Base Austin, Texas KAUS 280 100 Bicycle Lake Army ... Source: United States Army Corps of Engineers, Cold Regions Research...

54

E-Print Network 3.0 - army chemical corps Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 US ArmyUS Army...

55

Army Energy and Water Reporting System Assessment  

SciTech Connect (OSTI)

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

Deprez, Peggy C.; Giardinelli, Michael J.; Burke, John S.; Connell, Linda M.

2011-09-01T23:59:59.000Z

56

U.S. Army- Ft. Carson, Colorado  

Broader source: Energy.gov [DOE]

Fort Carson U.S. Army Base is located south of Colorado Springs, Colorado. It was the first Federal facility to install a "solar wall"—a solar ventilation air preheating system. The solar wall heats Ft. Carson's new high-bay aviation maintenance facility at Butts Army Airfield by pre-warming air as much as 54°F and supplying the heated air to the building's central heating system. This collector system is especially advantageous for buildings that require large volumes of heated air.

57

Army Energy Security Considerations | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: Scope Change #1 |MarketingVI,ProgramGo toCategoricalofArmyArmy

58

E-Print Network 3.0 - ammunition plant radford Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for STA 250, Radford M. Neal, 2000 3a.1 The Normal Distributions The distribution of data can... -2 0 2 4 0.0 0.2 0.4 -4 -2 0 2 4 0.0 0.2 0.4 -4 -2 0 2 4 0.0 0.2 0.4 12; Notes...

59

E-Print Network 3.0 - army environmental center Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

US Army... -895-1050 256-895-1877 Patricia.D.James@usace,army,mil U.S. Army Humphreys Engineer Center Support Activity... -428-7385 703-428-6660 ... Source: US Army Corps of...

60

army engineer district: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Prepared for the U.S. Army Corps of Engineers, Portland District, Environmental Management and Restoration Websites Summary: PNNL-22788 Final Prepared for the U.S. Army Corps...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

army engineers district: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Prepared for the U.S. Army Corps of Engineers, Portland District, Environmental Management and Restoration Websites Summary: PNNL-22788 Final Prepared for the U.S. Army Corps...

62

Flagging vigilance: the post-Vietnam "Hollow Army"  

E-Print Network [OSTI]

the recruiting shortfalls and civilian employee deficits and toward the issues of retention. It will demonstrate that a large part of the reason that the army suffered through increasing difficulty in regards to retention during the decade was due... in the army's civilian workforce, which performed three-fourths of the essential tasks needed to operate the army's bases. Readiness had been compromised due to budget cuts that had forced the army to divert over one division's worth of soldiers...

Lee, Robert Matthew

2001-01-01T23:59:59.000Z

63

An examination of the US Army's Environmental Ethic  

E-Print Network [OSTI]

In this thesis I argue that the best justification for an environmental ethic for the US Army is one which is based on an anthropocentric or humanistic approach, and I evaluate the Armys Environmental Ethic in light of this. I then consider the Army...

Danner, Benton Allen

1997-01-01T23:59:59.000Z

64

ATP 3-90.90 Army Tactical Standard Operating Procedures  

E-Print Network [OSTI]

ATP 3-90.90 Army Tactical Standard Operating Procedures November 2011 DISTRIBUTION RESTRICTION and Doctrine Digital Library at (www.train.army.mil). #12;ATP 3-90.90 Distribution Restriction: Approved.................................................3-4 #12;ii ATP 3-90.90 1 November 2011 Preface PURPOSE Army Techniques Publication (ATP) 3

US Army Corps of Engineers

65

Raising a Pragmatic Army: Officer Education at the U.S. Army Command and General Staff College, 1946-1986  

E-Print Network [OSTI]

. Pfaff, Army Professionalism, the Military Ethic, and Officership in the 21st Century (Carlisle, PA: US Army War College, Strategic Studies Institute, 1999), iii, 42. http://carlisle-www.army.mil/usassi/ssipubs/pubs99/ethic/ethic.htm (accessed July 7...

Stewart, Michael David

2010-04-23T23:59:59.000Z

66

Study of the treatability of wastewater from a coal-gasification plant. Final report, July 15, 1978-July 14, 1980  

SciTech Connect (OSTI)

This study focused on the coal gasification facility serving the Holston Army Ammunition Plant in Kingsport, Tennessee. Objectives were to characterize the wastewater produced by the gasification facility, and to evaluate technology for treating the waste in preparation for dischage to the environment. Most wastewater was recycled for scrubbing and cooling the product gas, with the excess requiring disposal found to be an average of only 1170 gallons per day (53 gallons per ton of coal, as received, and 366 gallons per million cubic feet of product gas). Analysis indicated that the waste was warm, high in alkaline material, especially ammonia, high in organic material, especially phenols, and also contaminated with other substances. Sulfides and thiocyanates were especially high in concentration. It was found that pretreatment could be accomplished by stripping (air injection) at high pH, removal of grease and oil (by pH suppression and light aeration) and neutralizatin. Equations were developed to describe the first two steps. Biological treatment through activated sludge was found to be successful, but effected only a moderate degree of treatment, and was troubled with frequent process upset. Attempts to improve treatment efficiency and stability are described. The data indicated the need to study aerated waste stabilization ponds as an alternative to activated sludge. Biological reaction kinetics were studied for activated sludge. Evaluation of the application of granular activated carbon suggested that this could be an effective practical tertiary treatment.

Iglar, A. F.

1980-01-01T23:59:59.000Z

67

Integrating the Army Geospatial Enterprise: Synchronizing Geospatial-Intelligence to the Dismounted James E. Richards  

E-Print Network [OSTI]

1 Integrating the Army Geospatial Enterprise: Synchronizing Geospatial. #12;2 [This Page Intentionally Left Blank] #12;3 Army`s Geospatial Architecture: delivering Geospatial-Intelligence of complex and urban terrain to the dismounted Soldier by James E. Richards ABSTRACT The Army`s Geospatial

de Weck, Olivier L.

68

Waste-to-Energy Projects at ArmyWaste to Energy Projects at Army Installations  

E-Print Network [OSTI]

Now!)p ( gy ) 2009 RDECOM WTE Technology Assessment Selected Army WTE Projects ERDC F l C ll D ERDC natural gas and steam by Oct 2016 [EISA 2007] Electricity use for federal government from renewable, NDAA 2007] Total consumption from renewable sources · At least 50% of required annual renewable energy

69

National Wetlands Inventory The U.S. Army Corps of Engineers (Corps) as of 2006 has accepted the administrative responsibility for  

E-Print Network [OSTI]

National Wetlands Inventory The U.S. Army Corps of Engineers (Corps) as of 2006 has accepted the administrative responsibility for the National Wetland Plant List from the U.S. Fish and Wildlife Service (FWS). In early 2009 the FWS removed the published 1988 and 1996 wetland plant lists from their National Wetland

US Army Corps of Engineers

70

army materials technology: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

army materials technology First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 ERDCELTR-12-10 Army Range...

71

E-Print Network 3.0 - army field artillery Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or Experience Summary: Instructor for MILS 1101, 2201, & 3301 Captain, US Army Political Science Field Artillery Officer, 9 years... , 2202, & 3302 Captain, US Army...

72

E-Print Network 3.0 - army medical research Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Army High Performance Computing Research Center Summary: Army High Performance Computing Research Center...

73

E-Print Network 3.0 - army frontmn tallinnas Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

W4RHAA Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Army High...

74

E-Print Network 3.0 - army medical department Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 U.S. Army Corps...

75

E-Print Network 3.0 - army medical center Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AND ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 U.S. Army Corps...

76

E-Print Network 3.0 - army unit faces Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 3 US ARMY ENGINEER...

77

E-Print Network 3.0 - army industrial facilities Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Energy Storage, Conversion and Utilization 3 US Army Corps of Engineers Engineer Research and Development Center Summary: for the Army in five major initiatives: -...

78

army personnel wu: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Ecology Websites Summary: Sustainability: Preserving Choice for the Army Friday, October 19, 2012 12:00 - 1:30 p.m. (lunch will be provided) Wrigley Hall, Room 481 Richard...

79

army artillerymen final: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by expert nurse educators, instructors, and administrators at Fort Sam Houston Post, San Antonio, Texas Texas A&M University - TxSpace Summary: The U.S. Army Licensed...

80

army research office: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Crawley@usace.army.mil; (601) 634-2142 or 3123; 3242 fax Puerto Rico Republic of Korea US Marshall Islands Virgin Islands 12;2 Alabama Amiri Engineering Corp 35 DEPARTMENT OF THE...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Investigation of the Integration of Interstitial Building Spaces on Costs and Time of Facility Maintenance for U.S. Army Hospitals  

E-Print Network [OSTI]

Huachuca, AZ Bliss Army Health Center Western Fort Carson, CO Evans Army Community Hospital Western Fort Leonard Wood, MO General Leonard Wood Army Community Hospital Western Fort Riley, KS Irwin Army Community Hospital Western Joint Base Lewis...-McChord, WA Madigan Army Medical Center Western Fort Leavenworth, KS Munson Army Health Center Western Fort Irwin, CA Weed Army Community Hospital Western Fort Bliss, TX William Beaumont Army Medical Center Of these, twelve U.S. Army hospitals were...

Leveridge, Autumn Tamara

2013-04-30T23:59:59.000Z

82

E-Print Network 3.0 - army future combat Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Sciences 63 MoviesMedia HintsGuides Summary: that puts you in the combat boots of a US Army infantryman. Earlier this week, we learned that for use... 's Army is...

83

General Lesley J. McNair: Little-Known Architect of the U.S. Army  

E-Print Network [OSTI]

General Lesley J. McNair demonstrated an innovative spirit and exceptional intellectual capacity in his efforts to organize and train the U.S. Army for World War II. The influence he exerted on Army doctrine, training, ...

Calhoun, Mark

2012-05-31T23:59:59.000Z

84

Integrating the Army Geospatial Enterprise : synchronizing geospatial-intelligence to the dismounted soldier  

E-Print Network [OSTI]

The Army's Geospatial Enterprise (AGE) has an emerging identity and value proposition arising from the need to synchronize geospatial information activities across the Army in order to deliver value to military decision ...

Richards, James E., S.M. Massachusetts Institute of Technology

2010-01-01T23:59:59.000Z

85

E-Print Network 3.0 - army air forces Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

33 Air Force Reserve Reserve 0 0 1 1 Army Active Active Duty 6 6 11 23 Army ... Source: New Hampshire, University of - Department of Electrical and Computer Engineering,...

86

E-Print Network 3.0 - army air defense Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Army Active Active Duty 6 6 11 23 Army National Guard Guard 21... 0 0 1 1 ... Source: New Hampshire, University of - Department of Electrical and Computer Engineering,...

87

E-Print Network 3.0 - army service response Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the Pacific Ocean Division, U.S. Army Corps of Engineers. As the Division Engineer, he is responsible... BUILDING STRONG U.S. ARMY CORPS OF ENGINEERS - PACIFIC OCEAN...

88

Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command  

E-Print Network [OSTI]

Volume XIX, No. 1 A publication of the U.S. Army Installation Management Command January -- the New Landscape #12;Public Works Digest · January/February 2007 Public Works Digest is an unofficial publication of the U.S. Army Installation Management Command, under AR 360-1, The Army Public Affairs Program

US Army Corps of Engineers

89

Developing Virtuous Soldiers: Mitigating the Problem of Fragmentation in the Army  

E-Print Network [OSTI]

Authority in the Army ................................................................. 58 Army Profession Concepts and Construal in the Life of Corporal Sanchez ................................................................... 63 IV HOLISTIC... has on soldiers? lives. Consider the following example from the life of a soldier who served in Iraq. Corporal Sanchez grew up with a strong sense of doing what is right. He entered the Army because he believed his Nation needed soldiers who would...

Berghaus, Paul T

2013-07-16T23:59:59.000Z

90

Award Recipient U.S. Army Armament Research,  

E-Print Network [OSTI]

Cooperative Research and Development Agreements (CRADAs) with ARDEC as a partner grew from 99 to more than140--representing79percentofthecash-invaluefor CRADAs signed by the Army's Research, Development and Engineering Command (RDECOM) laboratories. The increase in CRADA money that ARDEC could leverage during the three

Magee, Joseph W.

91

US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM  

E-Print Network [OSTI]

US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM INFRASTRUCTURE ASSESSMENT MISSION GUIDE March, hazardous materials, water and wastewater infrastructure (e.g. treatment facilities, lift stations, other Federal agencies (e.g. Bureau of Reclamation). The IA PRT program also supports water/wastewater

US Army Corps of Engineers

92

ERDC/ELTR-12-25 Army Range Technology Program  

E-Print Network [OSTI]

ERDC/ELTR-12-25 Army Range Technology Program Large-Scale Physical Separation of Depleted Uranium-Scale Physical Separation of Depleted Uranium from Soil Steven Larson, Victor Medina, John Ballard, Chris Griggs) at Yuma Proving Ground (YPG) to evaluate this technique for removal of depleted uranium (DU) metal from

US Army Corps of Engineers

93

a Miscellaneous Paper A-96-1 US Army Corps  

E-Print Network [OSTI]

. Netherland, Judy F. Shearer =.=- -===- Approved For Public Release; Distribution Is Unlimited Prepared for Control of Hydrilla by Michael D. Netherland, Judy F. Shearer U.S. Army Corps of Engineers Waterways Netherland, Michael D. Integrated use of fluridone and a fungal pathogen for control of hydrilla / by Michael

US Army Corps of Engineers

94

m Technical Report A-94-3 US Army Corps  

E-Print Network [OSTI]

as Potential Herbicide Delivery Systems by Michael D. Netherland, R. Michael Stewart David Sisneros U.S. Bureau of Controlled-Release Matrices as Potential Herbicide Delivery Systems by Michael D. Netherland, R. Michael as potential herbicide delivery systems I by Michael D. Netherland ·.. let al.] ; prepared for U.S. Army Corps

US Army Corps of Engineers

95

ERDCTR-12-5 Army Environmental Quality/Installations Program  

E-Print Network [OSTI]

for the Army and other organizations. Ultimately, populating tactical decision-making tools with critical- mental/operational risk, creating an industry/chemical crosswalk, linking the chemical database to a GIS was christened "TIC-Master," has the capability to enhance urban theater of operations analysis to identify TIC

US Army Corps of Engineers

96

US Army Research Office research in progress, July 1, 1991--June 30, 1992  

SciTech Connect (OSTI)

The US Army Research Office, under the US Army Materiel Command (AMC), is responsible for coordinating and supporting research in the physical and engineering sciences, in materials science, geosciences, biology, and mathematics. This report describes research directly supported by the Army Research Projects Agency, and several AMC and other Army commands. A separate section is devoted to the research program at the US Army Research, Development and Standardization Group - United Kingdom. The present volume includes the research program in physics, chemistry, biological sciences, mathematics, engineering sciences, metallurgy and materials science, geosciences, electronics, and the European Research Program. It covers the 12-month period from 1 July 1991 through 30 June 1992.

Not Available

1992-12-31T23:59:59.000Z

97

Hawthorne Army Depot Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor |Information AbandonmentHawkinsArmy Depot

98

Army Announces $7 Billion Action to Support Renewable Energy | Department  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical Challenges toReport | Department ofDepartment ofof Energy Army

99

Army Veteran Gains Experience at EM Site | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical Challenges toReport | Department ofDepartment ofof EnergyArmy

100

UNDERSTANDING ENTRAINMENT AT COASTAL POWER PLANTS  

E-Print Network [OSTI]

UNDERSTANDING ENTRAINMENT AT COASTAL POWER PLANTS: INFORMING A PROGRAM TO STUDY Landing Power Plant (at center). Image from the U.S. Army Corps of Engineers Digital Visual Library. #12; #12;i Acknowledgments The authors would like to thank many people who assisted with locating

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Disposal of chemical agents and munitions stored at Anniston Army Depot, Anniston, Alabama  

SciTech Connect (OSTI)

The purpose of this Phase I report is to examined the proposed implementation of on-site disposal at Anniston Army Depot (ANAD) in light of more detailed and more recent data than those included in the Final Programmatic Environmental Impact Statement (EPEIS). Two principal issues are addressed: (1) whether or not the new data would result in identification of on-site disposal at ANAD as the environmentally preferred alternative (using the same selection method and data analysis tools as in the FPEIS), and (2) whether or not the new data indicate the presence of significant environmental resources that could be affected by on-site disposal at ANAD. In addition, a status report is presented on the maturity of the disposal technology (and now it could affect on-site disposal at ANAD). Inclusion of these more recent data into the FPEIS decision method resulted in confirmation of on-site disposal for ANAD. No unique resources with the potential to prevent or delay implementation of on-site disposal at ANAD have been identified. A review of the technology status identified four principal technology developments that have occurred since publication of the FPEIS and should be of value in the implementation of on-site disposal at ANAD: the disposal of nonlethal agent at Pine Bluff Arsenal, located near Pine Bluff, Arkansas; construction and testing of facilities for disposal of stored lethal agent at Johnston Atoll, located about 1300 km (800 miles) southwest of Hawaii in the Pacific Ocean; lethal agent disposal tests at the chemical agent pilot plant operations at Tooele Army Depot, located near Salt Lake City, Utah; and equipment advances. 18 references, 13 figs., 10 tabs.

Hunsaker, D.B. Jr.; Zimmerman, G.P.; Hillsman, E.L.; Miller, R.L.; Schoepfle, G.M.; Johnson, R.O.; Tolbert, V.R.; Kroodsma, R.L.; Rickert, L.W.; Rogers, G.O.; Staub, W.P.

1990-09-01T23:59:59.000Z

102

E-Print Network 3.0 - army science board Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: army science board Page: << < 1 2 3 4 5 > >> 1 Professor of Military science Lieutenant Colonel...

103

E-Print Network 3.0 - army vehicles phase Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Unit of Action... experiments are simulations of military units. America's Army is a simulation of a squad level military Source: Carnegie Mellon University, School of...

104

E-Print Network 3.0 - army ants revisited Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

rugulosus (tribe Ecitonini) on a nest aggregation... their brood by carrying them to ad-hoc shelters under rocks above ground, but the army ants pursued... occurred repeatedly...

105

E-Print Network 3.0 - army scientific advisory Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: army scientific advisory Page: << < 1 2 3 4 5 > >> 1 Robert L. Byer Curriculum Vitae Born: May 9, 1942, Glendale, California Summary: Editorial Boards: Proceedings of...

106

E-Print Network 3.0 - army medical materiel Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

levels - Identifying... of data among various levels of Army leadership(Adapted from Jekel, Elmore, & Katz, 1996) Purpose of ... Source: Southern California, University of -...

107

E-Print Network 3.0 - army reserve components Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

one of these components of the US Army. Therefore... or anesthesia students who plan to enter a ... Source: Wood, James B. - Bermuda Biological Station for Research Collection:...

108

E-Print Network 3.0 - army surgical hospital Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Surgeon. Trained by Summary: ). Ran military hospital at Renkioi, influenced by Nightingale. Became Chair of Hygiene at Army Medical... , St Thomas's Hospital, Examiner, Mas-...

109

E-Print Network 3.0 - army europe 409th Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

army in western Saxony. Shortly after this vic- tory, Napoleon ordered... to preserve French dominance in Europe by closely scrutinizing his operations and strategy. Instead...

110

E-Print Network 3.0 - army camp desert Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in January 1992, after the army canceled elections won by the Islamic Salvation Front (FIS). Blocked from Source: Ecole Polytechnique, Centre de mathmatiques Collection:...

111

U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling (Fact Sheet)  

SciTech Connect (OSTI)

FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

Not Available

2010-04-01T23:59:59.000Z

112

E-Print Network 3.0 - army veterinary corps Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

our Biology graduates over the last Summary: in the US Army Medical Technologists Middle School Science Teachers... Nuclear Medical Technologists Optometrists Park...

113

E-Print Network 3.0 - army depot anniston Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Page 2 Insights Prayer is communication with God USACE... Transition (WT) Com- plex at Fort Bliss, Texas, one of nine Army construction projects funded by the American... and...

114

E-Print Network 3.0 - army depot activity Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Page 2 Insights Prayer is communication with God USACE... Transition (WT) Com- plex at Fort Bliss, Texas, one of nine Army construction projects funded by the American... and...

115

E-Print Network 3.0 - anniston army depot Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Page 2 Insights Prayer is communication with God USACE... Transition (WT) Com- plex at Fort Bliss, Texas, one of nine Army construction projects funded by the American... and...

116

E-Print Network 3.0 - army military police Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the FY09 Military Construction, Army program... The contract includes one Engineer Unit Operations Facility for 26.7 million, one Unit Military Police (MP... Public...

117

E-Print Network 3.0 - army national guard Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 3 County Total...

118

E-Print Network 3.0 - army medical treatment Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Directory...

119

E-Print Network 3.0 - army unit commander Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

THE ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 BUILDING STRONG...

120

E-Print Network 3.0 - army chief designated Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 CEMP-EA (1110)...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

E-Print Network 3.0 - army supply bulletin Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 CASI 2011 Work...

122

E-Print Network 3.0 - army materiel command Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OF ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Contemporary...

123

E-Print Network 3.0 - army solid state Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 DISTINGUISHED...

124

E-Print Network 3.0 - army special forces Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

W4RHAA Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 4 Michael Zyda,...

125

E-Print Network 3.0 - army field water Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Progress Summary: efforts in water and related land resources management. U.S. Army Engineer Institute for Water... : System-Wide Water Resources Programs Partners: U.S....

126

E-Print Network 3.0 - army war college Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the ... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 Department of...

127

E-Print Network 3.0 - army medical corps Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

... Source: US Army Corps of Engineers - Coastal and Hydraulics Laboratory (CERC) Engineer Waterways Experiment Station Vicksburg, MS Collection: Engineering 2 BUILDING STRONG...

128

E-Print Network 3.0 - army national training Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Biology and Medicine ; Environmental Sciences and Ecology 4 US ARMY ENGINEER SCHOOL 464 MANSCEN LOOP, FORT LEONARD WOOD, MO 65473 Summary: .milwoodcms...

129

Army Enhanced Use Lease (EUL) website | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergyElectric Coop Corp Place:ArmaecArmy Permit Application |

130

U S Army Corps of Engineers | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective:ToyoTurkey:S Army Corps of Engineers

131

U.S. Army Corps of Engineers | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective:ToyoTurkey:S Army Corps of EngineersCorps of

132

Army Energy Initiatives Task Force | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: Scope Change #1 |MarketingVI,ProgramGo toCategoricalofArmy

133

America's Atomic Army: The Historical Archaeology of Camp Desert Rock  

SciTech Connect (OSTI)

Established in 1951, Camp Desert Rock served as the training ground for America's 'Atomic Army'. For the next six years, U.S. ground troops traveled to the Nevada desert to participate in military maneuvers during atmospheric atomic weapons testing. Nearly 60,000 soldiers received physical and psychological training in atomic warfare. Abandoned when atmospheric testing ended, Camp Desert Rock was dismantled and its buildings moved to other locations. Today, the camp appears as a sterile expanse of desert marked by rock-lined tent platforms, concrete foundations, and trash scatters. Although visually unimposing, the site is rich with the history of America's nuclear testing program.

Susan R. Edwards

2007-11-02T23:59:59.000Z

134

Small arms ammunition  

DOE Patents [OSTI]

An elongate projectile for small arms use has a single unitary mass with a hollow nose cavity defined by a sharp rigid cutting edge adapted to make initial contact with the target surface and cut therethrough. The projectile then enters the target mass in an unstable flight mode. The projectile base is substantially solid such that the nose cavity, while relatively deep, does not extend entirely through the base and the projectile center of gravity is aft of its geometric center.

Huerta, Joseph (399 Clover St., Aberdeen, MD 21001)

1992-01-01T23:59:59.000Z

135

EPA and the Army Corps' Proposed Rule to Define "Waters of the United States"  

E-Print Network [OSTI]

EPA and the Army Corps' Proposed Rule to Define "Waters of the United States" Claudia Copeland.crs.gov R43455 #12;EPA and the Army Corps' Proposed Rule to Define "Waters of the United States regulatory definition of "waters of the United States" consistent with legal rulings--especially the Supreme

Gilbes, Fernando

136

Volume XVI, No. 5 A publication of the U.S. Army Installation Management Agency  

E-Print Network [OSTI]

Sain 12 Energy audit at Army lab shows opportunities to conserve by David Underwood 13 FY 2004 Annual/October 2004 U.S. Army Installation Management Agency In this issue: Energy Management and Water Conservation .................................................................................................................................................................................... 4 2004 Energy and Water Management awards by David Purcell 5 USMA wins award for energy efficiency 6

US Army Corps of Engineers

137

Volume XIX, No. 4 A publication of the U.S. Army Installation Management Command  

E-Print Network [OSTI]

..................................................................................................................... 20-21 Fort Bliss, Biggs Army Airfield linked by new bridge, by Edward Rivera 21 Corps constructs 10 Army applies program comments to thousands of historic properties, by Susan Thompson 11-12 Fort, by Jeremy S. Buddemeier 16-17 Fort Huachuca historic homes undergo restoration as part of neighborhood

US Army Corps of Engineers

138

Volume XIX, No. 5 A publication of the U.S. Army Installation Management Command  

E-Print Network [OSTI]

: A compact fluorescent light saves energy and money. U.S. Army photo September/October 2007 Vol. XIX, No. 5 ................................................................................................... 20 Energy and water campaign plan charts way forward, by Curt Wexel 20-21 Initiative 1 ­ Energy waste/October 2007 U.S. Army Installation Management Command In this issue: Energy and Water Conservation

US Army Corps of Engineers

139

Automotive Research Center A U.S. Army RDECOM Center of Excellence for Modeling and Simulation of Ground  

E-Print Network [OSTI]

Automotive Research Center A U.S. Army RDECOM Center of Excellence for Modeling and Simulation Janet Lyons Organized by the Automotive Research Center Sponsored by U.S. Army Research, Development and Engineering Command (RDECOM) U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC

Papalambros, Panos

140

Automotive Research Center A U.S. Army RDECOM Center of Excellence for Modeling and Simulation of Ground  

E-Print Network [OSTI]

Automotive Research Center A U.S. Army RDECOM Center of Excellence for Modeling and Simulation by the Automotive Research Center Sponsored by U.S. Army Research, Development and Engineering Command (RDECOM) U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC) National Automotive Center

Papalambros, Panos

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ATP 3-04.94 (FM 3-04.104) Army Techniques Publication for Forward Arming and  

E-Print Network [OSTI]

ATP 3-04.94 (FM 3-04.104) Army Techniques Publication for Forward Arming and Refueling Points.us.army.mil) and General Dennis J. Reimer Training and Doctrine Digital Library at (www.train.army.mil). #12;*ATP 3

US Army Corps of Engineers

142

#~i;:~~.:(' . AQUATIC PLANT CONTROL  

E-Print Network [OSTI]

-4 EFFECTS OF WATER CHEMISTRY ON SUBMERSED AQUATIC PLANTS: A SYNTHESIS by R. Michael Smart Environmental. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City. State, and ZIP Code) 3909 Halls Ferry Road IDENTIFICATION NUMBER ORGANIZATION (If applicable) US Army Corps of Engineers Be. ADDRESS (City, Stitte

US Army Corps of Engineers

143

U.S. Army weapon systems human-computer interface style guide. Version 2  

SciTech Connect (OSTI)

A stated goal of the US Army has been the standardization of the human computer interfaces (HCIs) of its system. Some of the tools being used to accomplish this standardization are HCI design guidelines and style guides. Currently, the Army is employing a number of HCI design guidance documents. While these style guides provide good guidance for the command, control, communications, computers, and intelligence (C4I) domain, they do not necessarily represent the more unique requirements of the Army`s real time and near-real time (RT/NRT) weapon systems. The Office of the Director of Information for Command, Control, Communications, and Computers (DISC4), in conjunction with the Weapon Systems Technical Architecture Working Group (WSTAWG), recognized this need as part of their activities to revise the Army Technical Architecture (ATA), now termed the Joint Technical Architecture-Army (JTA-A). To address this need, DISC4 tasked the Pacific Northwest National Laboratory (PNNL) to develop an Army weapon systems unique HCI style guide, which resulted in the US Army Weapon Systems Human-Computer Interface (WSHCI) Style Guide Version 1. Based on feedback from the user community, DISC4 further tasked PNNL to revise Version 1 and publish Version 2. The intent was to update some of the research and incorporate some enhancements. This document provides that revision. The purpose of this document is to provide HCI design guidance for the RT/NRT Army system domain across the weapon systems subdomains of ground, aviation, missile, and soldier systems. Each subdomain should customize and extend this guidance by developing their domain-specific style guides, which will be used to guide the development of future systems within their subdomains.

Avery, L.W.; O`Mara, P.A.; Shepard, A.P.; Donohoo, D.T.

1997-12-31T23:59:59.000Z

144

Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002  

E-Print Network [OSTI]

ESL-TR-02/12-02 BASELINE REPORT FOR THE FORT HOOD ARMY BASE: SEPT. 1, 2001 TO AUG. 31, 2002 A Research Project for the U.S. Army C.E.R.L. and the Ft. Hood Energy Office Jeff S. Haberl, Ph.D., P.E. Juan... REPORT, P. 1 December 2002 Energy Systems Laboratory, Texas A&M University PREFACE This report is the 2001/2002 baseline report for a multi-year Research Project performed for the U.S. Army Construction Engineering Research Laboratory...

Haberl, J. S.; Baltazar, J. C.; Sung, Y. H.; Claridge, D. E.; Turner, W. D.

145

Army National Guard (ARNG) Objective Supply Capability Adaptive Redesign (OSCAR) end-user manual  

SciTech Connect (OSTI)

The Objective Supply Capability Adaptive Redesign (OSCAR) project is designed to identify and develop programs which automate requirements not included in standard army systems. This includes providing automated interfaces between standard army systems at the National Guard Bureau (NGB) level and at the state/territory level. As part of the OSCAR project, custom software has been installed at NGB to streamline management of major end items. This software allows item managers to provide automated disposition on excess equipment to states operating the Standard Army Retail Supply System Objective (SARSS-O). It also accelerates movement of excess assets to improve the readiness of the Army National Guard (ARNG)--while reducing excess on hand. The purpose of the End-User Manual is to provide direction and guidance to the customer for implementing the ARNG Excess Management Program.

Pelath, R.P. [National Guard Bureau, Arlington, VA (United States)] [National Guard Bureau, Arlington, VA (United States); Rasch, K.A. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States)

1997-12-01T23:59:59.000Z

146

Army Net Zero: Energy Roadmap and Program Summary, Fiscal Year 2013 (Brochure)  

SciTech Connect (OSTI)

The U.S. Army (Army) partnered with the National Renewable Energy Laboratory (NREL) and the U.S. Army Corps of Engineers to assess opportunities for increasing energy security through improved energy efficiency and optimized renewable energy strategies at nine installations across the Army's portfolio. Referred to as Net Zero Energy Installations (NZEIs), these projects demonstrate and validate energy efficiency and renewable energy technologies with approaches that can be replicated across DOD and other Federal agencies, setting the stage for broad market adoption. This report summarizes the results of the energy project roadmaps developed by NREL, shows the progress each installation could make in achieving Net Zero Energy by 2020, and presents lessons learned and unique challenges from each installation.

Not Available

2014-08-01T23:59:59.000Z

147

Review of Interests and Activities in Thermoelectric Materials and Devices at the Army Research Laboratory  

Broader source: Energy.gov [DOE]

Army interests in thermoelectrics include integrated TE-hand-held burners for battery-replacement, waste-heat recovery on vehicles, heat-powered mobile units, and for thermoelectric cooling of high-performance infrared systems for surveillance

148

An overview and comparative analysis of United States Army Corps of Engineers partnering in construction  

E-Print Network [OSTI]

The construction industry is attacking the challenges of the 1990's by implementing the use of a concept known as partnering. Private and public sectors alike are showing interest in the application of this concept. The US Army Corps...

Rock, Timothy Patrick

1992-01-01T23:59:59.000Z

149

E-Print Network 3.0 - army aircraft Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MP3 Kazaa to fold Tighter security on restaurant... menus From the Los Angeles Times Video games Army to recruits: Uncle 'Sim' wants you By Alex Pham Times... -ups in the mud -- a...

150

E-Print Network 3.0 - army size military Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Last 7 days Go Older than 7 days Go Summary: 's military, the Army is developing video games to recruit and build awareness among Generation Y. Today... of their military...

151

EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order  

Broader source: Energy.gov [DOE]

BAGRAM AIRFIELD, Afghanistan – EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army.

152

E-Print Network 3.0 - army personnel Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Page: << < 1 2 3 4 5 > >> 1 Public Affairs Office Contact: Joseph Bonfiglio Honolulu Engineer District or Dino Buchanan Summary: July 7, 2011 Army Corps Awards Contract for New...

153

Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382  

SciTech Connect (OSTI)

Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operations at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)

Lowes, Elizabeth A. [The S.M. Stoller Corporation, Broomfield, Colorado (United States)

2012-07-01T23:59:59.000Z

154

Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations  

SciTech Connect (OSTI)

Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

2010-08-30T23:59:59.000Z

155

Waste reduction for electroless nickel-plating solutions at U. S. Army depots. Final report, Oct 91-Apr 92  

SciTech Connect (OSTI)

Waste minimization is one of the most pressing environmental issues currently facing U.S. Army depots. The U.S. Army Toxic and Hazardous Materials Agency (USATHAMA) conducts research and development to support Army depots in implementing technologies to reduce waste generation. The Joint Depot Environmental Panel (JDEP) identified electroless nickel (EN) plating, which is currently used at Corpus Christi Army Depot (CCAD), Red River Army Depot (RRAD), and Sacramento Army Depot (SAAD) as a target for waste minimization research. This report presents the results of an evaluation conducted by USA regarding minimizing waste from EN-plating operations. The objective of this evaluation was to formulate recommendations for depots regarding implementation of waste minimization technologies. This evaluation was performed through site visits, a literature search, and discussions with vendors of EN processes and decontamination technologies.

Davis, J.S.

1992-06-10T23:59:59.000Z

156

Savings Report for the Fort Hood Army Base  

E-Print Network [OSTI]

This report presents electricity consumption and electric demand savings analysis for the Thermal Plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at Ft. Hood, a...

Song, S.; Liu, Z.; Cho, S.; Baltazar-Cervantes, J. C.; Haberl, J. S.

157

Secretary Chu Visits Advanced Battery Plant in Michigan, Announces New Army  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13DiscoversGE SolarTravels to Memphis

158

Excess Titanium from NNSA's Y-12 Plant to be Used by the Army for New  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational NuclearhasAdministration77Nuclear SecurityFAPAC-NM | National

159

Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report  

SciTech Connect (OSTI)

This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

NONE

1991-06-14T23:59:59.000Z

160

US Army Corps of Engineers Caribbean Islands Region Version 2.0 WETLAND DETERMINATION DATA FORM Caribbean Islands Region  

E-Print Network [OSTI]

US Army Corps of Engineers Caribbean Islands Region ­ Version 2.0 WETLAND DETERMINATION DATA FORM ­ Caribbean Islands Region Project/Site: Municipality/Town: Sampling Date: Applicant/Owner: PR or USVI or problematic. Hydrophytic Vegetation Present? Yes No Remarks: #12;US Army Corps of Engineers Caribbean Islands

US Army Corps of Engineers

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners  

SciTech Connect (OSTI)

This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

2007-05-25T23:59:59.000Z

162

Planning Assistance to States U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG  

E-Print Network [OSTI]

nutrient study for water quality Funding. The Planning Assistance to States program is funded annuallyPlanning Assistance to States U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG® ® States, local governments and Native American Tribes often have needs in planning for water and related resources

US Army Corps of Engineers

163

ATP 4-91 (FMI 4-93.41) Army Field Support Brigade  

E-Print Network [OSTI]

ATP 4-91 (FMI 4-93.41) Army Field Support Brigade December 2011 DISTRIBUTION RESTRICTION: Approved and updates the Glossary for ATP 4-91. 2. A plus sign (+) marks new material. 3. ATP 4-91,15 December 2011;*ATP 4-91, C1 Distribution Restriction: Approved for public release; distribution is unlimited. *This

US Army Corps of Engineers

164

Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility; Preprint  

SciTech Connect (OSTI)

This paper describes the integrated energy optimization process for buildings and building clusters and demonstrates this process for new construction projects and building retrofits. An explanation is given of how mission critical building loads affect possible site and source energy use reduction in Army buildings.

Langner, R.; Deru, M.; Zhivov, A.; Liesen, R.; Herron, D.

2012-03-01T23:59:59.000Z

165

THE U.S. ARMY CORPS OF ENGINEERS AND NATURAL RESOURCES MANAGEMENT  

E-Print Network [OSTI]

the emergencies of World War II and the impact of the environmental movement on Army environmental planners, break new ground in tracing the history of environmental work in the context of the military-1987 by James R. Arnold and Roberta Wiener ENGINEERING AND HOUSING SUPPORT CENTER and OFFICE OF HISTORY UNITED

US Army Corps of Engineers

166

Volume XVIII, No. 3 A publication of the U.S. Army Installation Management Agency  

E-Print Network [OSTI]

. Washington, DC On the cover: Fire Chief Billy Cannedy, second from the right, front row, presents Fort Bliss ...................................................................................................... 4 Army environmental programs lauded by DoD by Deborah Elliott 5 Fort Campbell significantly reduces emissions, waste by Deborah Elliott 6 Fort Lewis cleanup projects ahead of schedule by Deborah Elliott 7

US Army Corps of Engineers

167

U. S. Army Measurement and Verification (M&V) Costing Toolkit  

E-Print Network [OSTI]

This is the 2003 final report for the U.S. Army Monitoring and Verification (M&V) costs project. The purpose of this project is to develop a M&V Costing Toolkit to be used by the government or third party planners to design a M&V plan...

Haberl, J. S.; Powell, T.; Carlson, K. A.; Im, P.; Turner, W. D.

2003-01-01T23:59:59.000Z

168

Volume XVI, No. 1 A publication of the U.S. Army Installation Management Agency  

E-Print Network [OSTI]

and Layout: Barbara Morris RPI Marketing Communications Baltimore, MD Cover photo: Dr. Fiori poses proudly Privatization cuts costs on Bamberg utility bills by Rick Emert 14-15 Army exceeds energy-reduction goal for FY .................................................................................................................................................. 22 Installation visualization tool enhances situational awareness by Kenneth Shaffer 22 IDS E

US Army Corps of Engineers

169

French Army Medical Services in the mid-nineteenth century: a medical history of the French Crimean expedition  

E-Print Network [OSTI]

to the reign of Louis XIV. During the 1850s the French Military Health Service was still regarded as among the most efficient in Europe. The Crimean War of 1854-1856 brought military success to French Armies, but it also brought a medical catastrophe...'s military predominance, its military medical establishment enjoyed the same prestige that was bestowed on the other arms. First-rate armies rarely have shoddy medical support, and French armies from the time of Louis XIY until the Second Empire were...

Harbison, Burton Earl

1987-01-01T23:59:59.000Z

170

Analysis of heat pumps installed in family housing at Hunter Army Air Field  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

Parker, S.A.

1994-08-01T23:59:59.000Z

171

Doctor of Engineering internship at the U.S. Army Engineer Waterways Experiment Station: an internship report  

E-Print Network [OSTI]

DOCTOR OF ENGINEERING INTERNSHIP AT THE U. S. ARMY ENGINEER WATERWAYS EXPERIMENT STATION An Internship Report by GEORGE CHARLES HOFF Submitted to the College of Engineering of Texas A&M University in Partial Fulfillment of the Requirements... for the Degree of DOCTOR OF ENGINEERING November 1981 Major Subject: Civil Engineering DOCTOR OF ENGINEERING INTERNSHIP AT THE U. S. ARMY ENGINEER WATERWAYS EXPERIMENT STATION An Internship Report by GEORGE CHARLES HOFF Approved as to style and content by...

Hoff, G. C. (George C.)

2013-03-13T23:59:59.000Z

172

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

SciTech Connect (OSTI)

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

173

Dramatic change at T Plant  

SciTech Connect (OSTI)

T Plant (221-T) was the first and largest of the early chemical separations plants at the Hanford Engineer Works (HEW), the name for the Hanford Site during World War II. Officially designated as a Cell Building by the Manhattan Engineer District (MED) of the Army Corps of Engineers (agency responsible for HEW), T Plant served as the headquarters of chemical processing operations at Hanford from its construction until the opening of the Reduction-Oxidation (REDOX) Plant in January 1952. T Plant performed the third step in plutonium production operations, following the steps of uranium fuel manufacture and then irradiation in defense production reactors. The fissionable core (plutonium) used in the world`s first atomic explosion, the Trinity bomb test held at Alamogordo, New Mexico, on July 16, 1945, was processed in T Plant. Likewise, the fissionable core of the weapon dropped over Nagasaki, Japan, on August 9, 1945, was processed in T Plant. Because it formed a crucial link in the first full-scale plutonium production operations in world history, T Plant meets criteria established in the National Historic Preservation Act of 19661 as a Historic Place.

Gerber, M.S.

1994-04-01T23:59:59.000Z

174

Potential sites for joint venture biomass fueled power plants. Final report  

SciTech Connect (OSTI)

The US Army is investigating wood-fired boilers. One application is for wood fuels to fire fixed power plant installations where the technology is well proven. Approximately 170 Army bases were evaluated for their heating and electrical needs versus fuel availability from on-base forests. Approximately 20 bases met the minimum demand and resource criteria. Potential joint venture partner classes were identified as new Contractor Owned/Contractor Operated (COCO) entrepreneurs; existing utilities and industries in the vicinity of the bases; and existing Government Owned/Contractor Operated (GOCO) entrepreneurs.

Not Available

1980-01-02T23:59:59.000Z

175

Development and Use of Baseline Monthly Utility Models for Eight Army Installations Around the United States  

E-Print Network [OSTI]

3/96-Final Report, p. i ESL-TR-96/03-01 DEVELOPMENT AND USE OF BASELINE MONTHLY UTILITY MODELS FOR EIGHT ARMY INSTALLATIONS AROUND THE UNITED STATES Prepared by: T.A. Reddy, N.F. Saman, D.E. Claridge, J.S. Haberl and W.D. Turner Research Sponsored... and Scope 2 2.1 Objectives 2 2.2 Data provided 3 2.3 Scope of study 7 3.0 Mathematical Basis of Regression Models 8 3.1 Pertinent background 8 3.2 Simple regression models using Emodel 9 3.3 Generation of 95% uncertainty bands for individual months 14 3...

Reddy, T. A.; Saman, N. F.; Claridge, D. E.; Haberl, J. S.; Turner, W. D.

1996-01-01T23:59:59.000Z

176

A review of "Richelieu’s Army: War, Government and Society in France." by David Parrott  

E-Print Network [OSTI]

278 SEVENTEENTH-CENTURY NEWS David Parrott. Richelieu?s Army: War, Government and Society in France, 1624-1642. Cambridge: Cambridge University Press, 2001. xxiv + 599 pp. $90.00. Review by THOMAS WORCESTER, COLLEGE OF THE HOLY CROSS. Interest... in Cardinal Richelieu (1585-1642), the chief minis- ter of King Louis XIII, never seems to fade, whether among anglophone scholars of French history, or among the French them- selves. An enduring icon of France?s glory and grandeur, Richelieu has often been...

Thomas Worcester

2002-01-01T23:59:59.000Z

177

Application for Department of the Army Permit: Engineering Form 4345 | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit: Engineering Form 4345 Jump to:

178

Army Corps of Engineers - Instructions for Preparing a Department of the  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergyElectric Coop Corp Place:ArmaecArmy Permit Application | Open

179

Power Plant Power Plant  

E-Print Network [OSTI]

Basin Center for Geothermal Energy at University of Nevada, Reno (UNR) 2 Nevada Geodetic LaboratoryStillwater Power Plant Wabuska Power Plant Casa Diablo Power Plant Glass Mountain Geothermal Area Lassen Geothermal Area Coso Hot Springs Power Plants Lake City Geothermal Area Thermo Geothermal Area

Tingley, Joseph V.

180

ALFRED COFRANC~SCO AQUATIC PLANT CONTROl  

E-Print Network [OSTI]

in US Army Corps of Engineer projects and navigable waterways. These herbicides include acrolein, copper

US Army Corps of Engineers

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Pakistan foreign policy formulation, 1947-65: an analysis of institutional interaction between American policy making bodies and the Pakistan Army   

E-Print Network [OSTI]

This thesis examines through the use of archives and oral evidence the role of the Pakistan Army in the context of Pakistan’s domestic politics and foreign policy. Its main purpose is to explore the autonomy of the Pakistan Army in shaping national...

Soherwordi, Syed Hussain Shaheed

2010-01-01T23:59:59.000Z

182

H:/fctshts/rad_fs.ppt U.S. Army Corps of Engineers Buffalo District April, 1998  

E-Print Network [OSTI]

exposure to ionizing radiation cannot be avoided. Exposures can be natural or man-made. Natural sources include cosmic rays and naturally-occurring radionuclides in the earth and air, and are consideredH:/fctshts/rad_fs.ppt Fact Sheet Radiation U.S. Army Corps of Engineers ·Buffalo District ·April

US Army Corps of Engineers

183

Report of the Independent Scientific Advisory Board Review of the U.S. Army Corps of Engineers'  

E-Print Network [OSTI]

Report of the Independent Scientific Advisory Board Review of the U.S. Army Corps of Engineers Report 99-4 February 16, 1999 #12;ISAB Report 99-4, Page 1 February 16, 1999 CONTENTS CONTENTS .............................................................................................. 10 PURPOSE OF THE REPORT

184

U.S. ARMY CORPS OF ENGINEERS HURRICANE SANDY COASTAL MANAGEMENT DIVISION 130 Wainwright Dr. Fort Hamilton, NY 11209  

E-Print Network [OSTI]

future sea level rise and climate change scenarios, to reduce risk to vulnerable population, property August 2013 U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG® The North Atlantic Coast Comprehensive Study will identify existing green/nature-based infrastructure, include an evaluation of the performance of green

US Army Corps of Engineers

185

The Disarmament School: US Policy for the Disarmament and Demobilization of the Germany Army, November-December 1944  

E-Print Network [OSTI]

Military Tradition. This demilitarization of Germany was the chief goal of victory and means of ensuring lasting peace in Europe. In November and December of 1944, the US Army hosted the Disarmament School, a series of lectures by experts in the field...

Wilkerson, Joseph Jr

2009-08-11T23:59:59.000Z

186

Evaluate and characterize mechanisms controlling transport, fate, and effects of army smokes in the aerosol wind tunnel: Transport, transformations, fate, and terrestrial ecological effects of hexachloroethane obscurant smokes  

SciTech Connect (OSTI)

The terrestrial transport, chemical fate, and ecological effects of hexachloroethane (HC) smoke were evaluated under controlled wind tunnel conditions. The primary objectives of this research program are to characterize and assess the impacts of smoke and obscurants on: (1) natural vegetation characteristic of US Army training sites in the United States; (2) physical and chemical properties of soils representative of these training sites; and (3) soil microbiological and invertebrate communities. Impacts and dose/responses were evaluated based on exposure scenarios, including exposure duration, exposure rate, and sequential cumulative dosing. Key to understanding the environmental impacts of HC smoke/obscurants is establishing the importance of environmental parameters such as relative humidity and wind speed on airborne aerosol characteristics and deposition to receptor surfaces. Direct and indirect biotic effects were evaluated using five plant species and two soil types. HC aerosols were generated in a controlled atmosphere wind tunnel by combustion of hexachloroethane mixtures prepared to simulate normal pot burn rates and conditions. The aerosol was characterized and used to expose plant, soil, and other test systems. Particle sizes of airborne HC ranged from 1.3 to 2.1 {mu}m mass median aerodynamic diameter (MMAD), and particle size was affected by relative humidity over a range of 20% to 85%. Air concentrations employed ranged from 130 to 680 mg/m{sup 3}, depending on exposure scenario. Chlorocarbon concentrations within smokes, deposition rates for plant and soil surfaces, and persistence were determined. The fate of principal inorganic species (Zn, Al, and Cl) in a range of soils was assessed.

Cataldo, D.A.; Ligotke, M.W.; Bolton, H. Jr.; Fellows, R.J.; Van Voris, P.; McVeety, B.D.; Li, Shu-mei W.; McFadden, K.M.

1989-09-01T23:59:59.000Z

187

Building-associated risk of febrile acute respiratory diseases in Army trainees  

SciTech Connect (OSTI)

Airborne transmission of infectious agents and associations of indoor air pollutants with respiratory illnesses are well documented. We hypothesized that energy conservation measures that tighten buildings also increase risks of respiratory infection among building occupants. At four Army training centers during a 47-month period, incidence rates of febrile acute respiratory disease were compared between basic trainees in modern (energy-efficient design and construction) and old barracks. Rates of febrile acute respiratory disease were significantly higher among trainees in modern barracks (adjusted relative risk estimate, 1.51; 95% confidence interval, 1.46 to 1.56), and relative risks were consistent at the four centers. These results support the hypothesis that tight buildings with closed ventilation systems significantly increase risks of respiratory-transmitted infection among congregated, immunologically susceptible occupants.

Brundage, J.F.; Scott, R.M.; Lednar, W.M.; Smith, D.W.; Miller, R.N.

1988-04-08T23:59:59.000Z

188

Remediation application strategies for depleted uranium contaminated soils at the US Army Yuma Proving Ground  

SciTech Connect (OSTI)

The US Army Yuma Proving Ground (YPG), located in the southwest portion of Arizona conducts firing of projectiles into the Gunpoint (GP-20) firing range. The penetrators are composed of titanium and DU. The purpose of this project was to determine feasible cleanup technologies and disposal alternatives for the cleanup of the depleted uranium (DU) contaminated soils at YPG. The project was split up into several tasks that include (a) collecting and analyzing samples representative of the GP-20 soils, (b) evaluating the data results, (c) conducting a literature search of existing proven technologies for soil remediation, and (0) making final recommendations for implementation of this technology to the site. As a result of this study, several alternatives for the separation, treatment, and disposal procedures are identified that would result in meeting the cleanup levels defined by the Nuclear Regulatory Commission for unrestricted use of soils and would result in a significant cost savings over the life of the firing range.

Vandel, D.S.; Medina, S.M.; Weidner, J.R.

1994-03-01T23:59:59.000Z

189

Energy Engineering Analysis Program (EEAP), William Beaumont Army Medical Center, Fort Bliss, Texas. Executive summary  

SciTech Connect (OSTI)

The purpose of this study was to perform a complete energy audit and analysis of William Beaumont Army Medical Center (WBAMC) under the guidelines of the Energy Engineering Analysis Program (EEAP) at Fort Bliss in El Paso, Texas. Project documentation was prepared for all economically feasible energy conservation opportunities (ECOs). This report summarizes the work, including (1) Performing a complete energy audit and analysis for the entire hospital facility. (2) Developing a metering plan for the facility. (3) Identifying all ECOs and performing complete evaluations, including low cost/no cost items. (4) Preparing project documentation for all economically justifiable ECOs. (5) Listing and prioritizing all recommended energy conservation projects. and (6) Preparing a comprehensive report which documents the work accomplished, the results, and the recommendations.

NONE

1984-08-01T23:59:59.000Z

190

Artificial intelligence technology assessment for the US Army Depot System Command  

SciTech Connect (OSTI)

This assessment of artificial intelligence (AI) has been prepared for the US Army's Depot System Command (DESCOM) by Pacific Northwest Laboratory. The report describes several of the more promising AI technologies, focusing primarily on knowledge-based systems because they have been more successful in commercial applications than any other AI technique. The report also identifies potential Depot applications in the areas of procedural support, scheduling and planning, automated inspection, training, diagnostics, and robotic systems. One of the principal objectives of the report is to help decisionmakers within DESCOM to evaluate AI as a possible tool for solving individual depot problems. The report identifies a number of factors that should be considered in such evaluations. 22 refs.

Pennock, K A

1991-07-01T23:59:59.000Z

191

A brief history of the T Plant facility at the Hanford Site. Addendum 1  

SciTech Connect (OSTI)

T Plant (221-T) was the first and largest of the early chemical separations plants at the Hanford Engineer Works (HEW) (World War II name for the Hanford Site). Officially designated as a Cell Building by the Manhattan Engineer District (MED) of the Army Corps of Engineers (agency responsible for HEW), T Plant served as the headquarters of chemical processing operations at Hanford from its construction until the opening of the REDOX Plant in January 1952. Because it formed a crucial link in the first full-scale plutonium production operations in world history, it meets criteria established in the National Historic Preservation Act of 1966 as a National Historic Structure.

Gerber, M.S.

1994-05-16T23:59:59.000Z

192

Impact response of US Army and National Football League helmet pad systems  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory [LLNL] was tasked to compare the impact response of NFL helmet pad systems and U.S. Army pad systems compatible with an Advanced Combat Helmet [ACH] at impact velocities up to 20 ft/s. This was a one-year study funded by the U.S. Army and JIEDDO. The Army/JIEDDO point of contact is COL R. Todd Dombroski, DO, JIEDDO Surgeon. LLNL was chosen by committee to perform the research based on prior published computational studies of the mechanical response of helmets and skulls to blast. Our collaborators include the U.S. Army Aeromedical Research Laboratory [USAARL] (a DoD laboratory responsible for impact testing helmets), Team Wendy and Oregon Aero (current and former ACH pad manufacturers), Riddell and Xenith (NFL pad manufacturers), and d3o (general purpose sports pad manufacturer). The manufacturer-supplied pad systems that were studied are shown in the figure below. The first two are the Army systems, which are bilayer foam pads with both hard and soft foam and a water-resistant airtight wrapper (Team Wendy) or a water-resistant airtight coating (Oregon Aero). The next two are NFL pad systems. The Xenith system consists of a thin foam pad and a hollow air-filled cylinder that elastically buckles under load. The Riddell system is a bilayer foam pad that is encased in an inflatable airbag with relief channels to neighboring pads in the helmet. The inflatable airbag is for comfort and provides no enhancement to impact mitigation. The d3o system consists of a rate-sensitive homogeneous dense foam. LLNL performed experiments to characterize the material properties of the individual foam materials and the response of the complete pad systems, to obtain parameters needed for the simulations. LLNL also performed X-ray CT scans of an ACH helmet shell that were used to construct a geometrically accurate computational model of the helmet. Two complementary sets of simulations were performed. The first set of simulations reproduced the experimental helmet impact certification tests performed by USAARL, who provided data for comparison. The goal of this set of simulations was to demonstrate the overall validity of LLNL's computational analyses and methods and understand the general physics of helmet impacts. In these tests and the corresponding simulations, an inverted ACH containing pads and a head-form are dropped onto a hemispherical anvil, at 10 and 14.14 ft/s impact velocities. The simulations predicted peak accelerations (the metric used by USAARL for comparing the performance of pad systems), rebound velocities, and impact durations consistent with the experimental data, thus demonstrating the validity and relevance of the simulation methods. Because the NFL pad systems are approximately double the thickness of the U.S. Army pads, they do not fit into the ACH. As a result, the NFL pads could not be simply placed into an ACH shell in either a simulation or an experiment without modifying their size and shape. Since impact mitigation depends critically on the available stopping distance and the area over which the stopping force is applied, it is important to consider identically shaped pads in order to compare their performance in a fair and meaningful manner. Consequently, the second set of simulations utilized a simplified simulation geometry consisting of a 5 kg cylindrical impactor (equal in mass to a head) striking equally sized pads from each manufacturer. The simulated bilayer foam pads had the same proportions of hard and soft foam as the actual pad systems, while the Xenith pads were simulated as a bilayer foam pad with material properties adjusted to give the same response as the actual Xenith pads. The effects of trapped air were included in the simulations of the Team Wendy and Oregon Aero pads. All simulations used material properties derived from the experiments conducted at LLNL. The acceleration history of the center of mass of the impactor was used to calculate the Head Injury Criterion (HIC) for each simulation, to assess the pad performance. The HIC is a well-established

Moss, W C; King, M J

2011-02-18T23:59:59.000Z

193

Evaluate and characterize mechanisms controlling transport, fate and effects of army smokes in an aerosol wind tunnel: Transport, transformations, fate and terrestrial ecological effects of fog oil obscurant smokes: Final report  

SciTech Connect (OSTI)

The terrestrial transport, chemical fate, and ecological effects of fog oil (FO) smoke obscurants were evaluated under controlled wind tunnel conditions. The primary objectives of this research program are to characterize and assess the impacts of smoke and obscurants on: (1) natural vegetation characteristic of US Army training sites in the United States; (2) physical and chemical properties of soils representative of these training sites; and (3) soil microbiological and invertebrate communities. Impacts and dose/responses were evaluated based on an exposure scenario, including exposure duration, exposure rate, and sequential cumulative dosing. Key to understanding the environmental impacts of fog oil smoke/obscurants is establishing the importance of environmental parameters, such as relative humidity and wind speed on airborne aerosol characteristics and deposition to receptor surfaces. Direct and indirect biotic effects were evaluated using five plant species and three soil types. 29 refs., 35 figs., 32 tabs.

Cataldo, D.A.; Van Voris, P.; Ligotke, M.W.; Fellows, R.J.; McVeety, B.D.; Li, Shu-mei W.; Bolton, H. Jr.; Fredrickson, J.K.

1989-01-01T23:59:59.000Z

194

reliable, efficient, ultra-clean Fuel Cell Power Plant Experience  

E-Print Network [OSTI]

(US Army CERL) propane · 5 kW adiabatic fuel processor (US Army CERL) ­ B-100 bio diesel · Bench scale

195

A new glide path: re-architecting the Flight School XXI Enterprise at the U.S. Army Aviation Center of Excellence  

E-Print Network [OSTI]

This thesis utilizes eight Enterprise Architecture views to analyze the U.S. Army Aviation Center of Excellence's Flight School XXI Enterprise and provides recommendations to improve the effectiveness and efficiency of ...

Enos, James R. (James Robert)

2010-01-01T23:59:59.000Z

196

A review of "The Dynastic State and the Army under Louis XIV: Royal Service and Private Interest, 1661-1701." by Guy Rowlands  

E-Print Network [OSTI]

society and agriculture, and economic development in early modern England. Guy Rowlands. The Dynastic State and the Army under Louis XIV: Royal Service and Private Interest, 1661-1701. Cambridge: Cambridge University Press, 2002. xxv + 404 pp. $70....00. Review by WENDY F. KASINEC, SOUTHWESTERN UNIVERSITY. This ambitious and provocative book by Guy Rowlands regarding the army during Louis XIV?s rule situates this vital institution within the context of personal and dynastic concerns held by both the king...

Wendy F. Kasinec

2005-01-01T23:59:59.000Z

197

Technical Assessment for the CPC FD-7x-1500 Wind Turbine located at Tooele Army Base, Tooele Utah  

SciTech Connect (OSTI)

The CPC FD-7x-1500 Wind Turbine was installed with funding from the Energy Conservation Investment Program (ECIP). Since its installation, the turbine has been plagued with multiple operational upsets causing unacceptable down time. In an effort to reduce down time, the Army Corps of Engineers requested the Idaho National Laboratory conduct an assessment of the turbine to determine its viability as an operational turbine.

Robert J. Turk; Kurt S. Myers; Jason W. Bush

2012-08-01T23:59:59.000Z

198

Estimates of energy consumption by building type and end use at U.S. Army installations  

SciTech Connect (OSTI)

This report discusses the use of LBNL`s End-use Disaggregation Alogrithm (EDA) to 12 US Army installations nationwide in order to obtain annual estimates of electricity use for all major building types and end uses. The building types include barrack, dining hall, gymnasium, administration, vehicle maintenance, hospital, residential, warehouse, and misc. Up to 8 electric end uses for each type were considered: space cooling, ventilation (air handling units, fans, chilled and hot water pumps), cooking, misc./plugs, refrigeration, exterior and interior lighting, and process loads. Through building simulations, we also obtained estimates of natural gas space heating energy use. Average electricity use for these 12 installations and Fort Hood are: HVAC, misc., and indoor lighting end uses consumed the most electricity (28, 27, and 26% of total[3.8, 3.5, and 3.3 kWh/ft{sup 2}]). Refrigeration, street lighting, exterior lighting, and cooking consumed 7, 7, 3, and 2% of total (0.9, 0.9, 0.4, and 0.3 kWh/ft{sup 2})

Konopacki, S.J.; Akbari, H.

1996-08-01T23:59:59.000Z

199

US Army facility for the consolidation of low-level radioactive waste  

SciTech Connect (OSTI)

A preliminary study of a waste consolidation facility for the Department of the Army's low-level radioactive waste was carried out to determine a possible site and perform a cost-benefit analysis. Four sites were assessed as possible locations for such a facility, using predetermined site selection criteria. To assist in the selection of a site, an evaluation of environmental issues was included as part of each site review. In addition, a preliminary design for a waste consolidation facility was developed, and facilities at each site were reviewed for their availability and suitability for this purpose. Currently available processes for volume reduction, as well as processes still under development, were then investigated, and the support and handling equipment and the staff needed for the safe operation of a waste consolidation facility were studied. Using current costs for the transportation and burial of low-level waste, a cost comparison was then made between waste disposal with and without the utilization of volume reduction. Finally, regulations that could affect the operation of a waste consolidation facility were identified and their impact was assessed. 11 references, 5 figures, 16 tables.

Stein, S.L.; Tanner, J.E.; Murphy, B.L.; Gillings, J.C.; Hadley, R.T.; Lyso, O.M.; Gilchrist, R.L.; Murphy, D.W.

1983-12-01T23:59:59.000Z

200

Evaluation and characterization of mechanisms controlling fate and effects of Army smokes  

SciTech Connect (OSTI)

The primary objective of this study was to characterize the fate and response of soil and biotic components of the terrestrial environment to aerosols, deposited brass, and brass in combination with fog oil. Important physical, chemical, and biotic aspects were investigated using an environmental wind tunnel. Air/surface deposition rates were determined for foliar and soil surfaces, both in the absence and presence of fog oil. Deposition velocities for foliage ranged from 0.1 to 1.0 cm/s at wind speeds of 2 to 10 mph, respectively. Foliar contact toxicity was assessed using five different types of terrestrial vegetation representative of Army training sites and surrounding environments. No significant foliar contact toxicity was observed for brass. The weathering and chemistry of brass aerosols deposited and amended to soils was assessed, along with the impacts of acid precipitation and moisture regimes on weathering rates. Rates of brass weathering and the fate of solubilized Cu and Zn are discussed. The influence of soil weathering processes and brass solubilization on seed germination indicated no detectable effects of brass. However, moderate toxicity effects were noted after seed germination indicated no detectable effects of brass. However, moderate toxicity effects were noted after 160 days of soil incubation. The effects were proportional to soil-loading levels. Influence of soil weathering processes and contaminant solubilization on soil microbiological activities indicated that soil dehydrogenase activity was more susceptible to impacts than was phosphatase activity or microbial biomass. Nitrifying bacteria and heterotrophic bacteria were not significantly affected by brass. Invertebrates (earthworms) associated with soil contaminated with brass were only slightly impacted, and only at loading rates >445 {mu}g/cm{sup 2}.

Cataldo, D.A.; Ligotke, M.W.; Bolton, H. Jr.; Fellows, R.J.; Van Voris, P.; McKinley, J.P.; Mi, Shu-mei W.; McFadden, K.M.

1990-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Energy efficiency campaign for residential housing at the Fort Lewis army installation  

SciTech Connect (OSTI)

In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

AH McMakin; RE Lundgren; EL Malone

2000-02-23T23:59:59.000Z

202

U.S. Army Corps of Engineers Delivers Cost and Schedule Validation...  

Energy Savers [EERE]

102-ton door was set on top of the 85-ton door that was installed at the end of December. Hanford Waste Treatment Plant Sets Massive Protective Shield door in Pretreatment Facility...

203

Continuous Commissioning of the Reynolds Army Community Hospital, Fort Sill, Oklahoma  

E-Print Network [OSTI]

) during both phases of the project. In this paper the optimization of the facilities Heating, Ventilation, and Air Conditioning (HVAC) systems through the CC® process is presented. Detailed commissioning activities of the Hospital and Central Plant...

Turner, W. D.; Baltazar-Cervantes, J. C.; Martinez, J. T.

2007-01-01T23:59:59.000Z

204

Army Net Zero: Energy Roadmap and Program Summary, Fiscal Year 2013 (Brochure), Department of Defense (DoD)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICEAmesApplication2Argonne National4 Arizona -Energy43ArmedARMY

205

AQUATIC PLANT CONTROL RESEARCH PROGRAM  

E-Print Network [OSTI]

. Michael Smart, John W. Barko Environmental Laboratory DEPARTMENT OF THE ARMY Waterways Experiment. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) PO Box 631 Vicksburg, MS NUMBER ORGANIZATION (If IIPplicable) US Army Corps of Engineers 8c. ADDRESS (City, State, and ZIP Code

US Army Corps of Engineers

206

Bioaugmentation of TNT-contaminated soil  

E-Print Network [OSTI]

Microbial transformation of trinitrotoluene (TNT) in phics. contaminated soil was investigated in this research. A Bacillus sp., isolated from soil obtained from an army ammunition facility, was used to enhance the rate of TNT removal over a 360 day...

Bokelmann, Annamarie

1999-01-01T23:59:59.000Z

207

Developer Installed Treatment Plants  

E-Print Network [OSTI]

-installed treatment plants. These treatment plants are more commonly known as package wastewater treatment plants. 1

unknown authors

2008-01-01T23:59:59.000Z

208

Evaluation of the utilities energy monitoring and control system installed at the US Army, Europe, Pirmasens and 97th Base Support Battalion, Germany  

SciTech Connect (OSTI)

Authorized under an interagency agreements between the US Department of Energy and the US Army, evaluation of the utilities energy monitoring and control system (UEMCSs) operating at selected US Army installations in Heidelberg, Goeppingen, Pirmasens, and Baumholder, Germany, is nearing completion. This report specifically presents the results of the evaluation of the UEMCS installed at USAREUR, 21st Theater Army Area Command (TAACOM), Pirmasens and 97th Base Support Battalion, which is operated by the Directorate of Engineering and Housing (DEH) Utilities Division. The Oak Ridge National Laboratory (ORNL) was selected by Headquarters, USAREUR, Facilities Engineering Division, Utilities and Energy Branch in Heidelberg to evaluated the overall effectiveness and energy efficiency of UEMCSs at four US Army installations in Germany. The third of these systems to be evaluated, which is the scope of this report, is the UEMCS installed at Pirmasens. This evaluation relies upon existing data and information and does not involve introducing metering and instrumentation for the purpose of measuring installation energy use. The primary purpose of this evaluation is to take an in-depth look at the overall performance and effectiveness of the UEMCS installed at Pirmasens to see if it is achieving its operational objectives by resulting in energy and cost savings.

Broders, M.A.; McConnell, B.W.

1992-01-01T23:59:59.000Z

209

Access to Redstone Arsenal Marshall Space Flight Center is located on the U.S. Army's Redstone Arsenal in Huntsville, Ala.  

E-Print Network [OSTI]

Access to Redstone Arsenal Marshall Space Flight Center is located on the U.S. Army's Redstone of the hosting organization. For more information about visiting Marshall, please visit the Visitor Information page: http://www.nasa.gov/centers/marshall/about/visitor.html If you have prior approval for a visit

Waliser, Duane E.

210

Baseline Report for the Fort Hood Army Base: September 2003 to October 2004  

E-Print Network [OSTI]

December 2004 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University System Ft. Hood Baseline Report, p. 1 December 2004 Energy Systems Laboratory, Texas A&M University PREFACE This report... building was also initiated in November of 2001 and completed in 2002. The data from Central Thermal Power Plant (87000), III Corp building, Darnall Hospital 1 , Main Substation, West Substation, and North Substation are plotted and reported...

Haberl, J. S.; Liu, Z.

2007-09-21T23:59:59.000Z

211

U.S. Army Corps of Engineers Delivers Cost and Schedule Validation for  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of EnergyTheDepartment of1: OracleHanford Waste Treatment Plant

212

Energy Savings and Persisitence From an Energy Services Performance Contract at an Army Base  

E-Print Network [OSTI]

?Carlos Baltazar, Ph.D. 1 Associate Research Engineer Jeff S. Haberl, Ph.D., P.E. 1 Professor/Associate Director Edwin Frazier2 Electrical Engineer Bobby Lynn2 Chief, Energy Management Branch 1Energy Systems Laboratory Texas A&M University System 2 Fort... Bldg. DO#1 31,470 ? ? 5,887 3 87012 Enlisted UPH Bldg. DO#1 42,306 ? ? 9,719 4 87017 Dining Facility DO#1 15,695 ? ? 41,390 5 87018 Physical Plant DO#1 3,327 ? ? ? 522,971 6 91012 Admin Bldg. DO#1 86,292 ? ? 391,136 1,902,446 7 13 Information...

Kim, H.; Baltazar, J.C.; Haberl, J.; Lewis, C.; Yazdani, B.

2011-01-01T23:59:59.000Z

213

Reassessment of liquefaction potential and estimation of earthquake- induced settlements at Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report  

SciTech Connect (OSTI)

This report documents a reassessment of liquefaction potential and estimation of earthquake-induced settlements for the U.S. Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP), located southwest of Paducah, KY. The U.S. Army Engineer Waterways Experiment Station (WES) was authorized to conduct this study from FY91 to FY94 by the DOE, Oak Ridge Operations (ORO), Oak Ridge, TN, through Inter- Agency Agreement (IAG) No. DE-AI05-91OR21971. The study was conducted under the Gaseous Diffusion Plant Safety Analysis Report (GDP SAR) Program.

Sykora, D.W.; Yule, D.E.

1996-04-01T23:59:59.000Z

214

Improving central heating plant performance at the defense construction supply center (DCSC): Advanced operation and maintenance methods. Final report  

SciTech Connect (OSTI)

A 1987 air pollution emissions test done by the U.S. Army Environmental Hygiene Agency (USAEHA) identified several problems with the central heating plant (CHP) at the Defense Construction Supply Center (DCSC), Columbus, OH. Though DCSC repaired the specified problems, improved coal specifications, and tried to reduce air infiltration, CHP performance remained at unacceptable levels. Consequently, DCSC contracted the U.S. Army Construction Engineering Research Laboratories (USACERL) to apply advanced operation and maintenance procedures to improve its combustion system. This study employed a system-wide approach to evaluate the CHP 5 fuel storage, combustion, heat distribution, and the control of air emissions. Many short-term improvements to the CHP were identified and tested. Subsequent combustion and air emissions tests revealed that the recommended improvements successfully increased CHP efficiency. Long-term improvements were also recommended to help maintain the short-term improvements.

Savoie, M.J.; Standerfer, J.; Schmidt, C.M.; Gostich, J.; Mignacca, J.

1994-11-01T23:59:59.000Z

215

Optimizing Dam Operations for Power and for Fish: an Overview of the US Department of Energy and US Army Corps of Engineers ADvanced Turbine Development R&D. A Pre-Conference Workshop at HydroVision 2006, Oregon Convention Center, Portland, Oregon July 31, 2006  

SciTech Connect (OSTI)

This booklet contains abstracts of presentations made at a preconference workshop on the US Department of Energy and US Army Corps of Engineers hydroturbine programs. The workshop was held in conjunction with Hydrovision 2006 July 31, 2006 at the Oregon Convention Center in Portland Oregon. The workshop was organized by the Corps of Engineers, PNNL, and the DOE Wind and Hydropower Program. Presenters gave overviews of the Corps' Turbine Survival Program and the history of the DOE Advanced Turbine Development Program. They also spoke on physical hydraulic models, biocriteria for safe fish passage, pressure investigations using the Sensor Fish Device, blade strike models, optimization of power plant operations, bioindex testing of turbine performance, approaches to measuring fish survival, a systems view of turbine performance, and the Turbine Survival Program design approach.

Dauble, Dennis D.

2006-08-01T23:59:59.000Z

216

Plants & Animals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Los Alamos, NM 87545 (505) 667-0216 Email We sample many plants and animals, including wild and domestic crops, game animals, fish, and food products from animals, as well as...

217

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities  

SciTech Connect (OSTI)

The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

Warwick, William M.

2010-09-30T23:59:59.000Z

218

Health-hazard evaluation report HETA 88-369-2141, Raymond W. Bliss Army Community Hospital, Ft. Huachuca, Arizona  

SciTech Connect (OSTI)

In response to a request from a representative of the Raymond W. Bliss Army Community Hospital concerning indoor air quality at Greely Hall, Fort Huachuca (SIC-9711), Arizona, an environmental and ventilation survey was conducted. Greely Hall was a three story, multipurpose building with approximately 120,000 feet per floor. The building housed primarily offices, but also had a cafeteria, auditorium, computer rooms, conference rooms and electronics maintenance area. Over 2100 persons worked in the building. Average carbon-dioxide (124389) levels were 584 parts per million (ppm) in the morning, increasing to 1040ppm for the last measurements made that day. The levels ranged from 350 to 1000ppm in the morning to 800 to 1800ppm in the afternoon. Inordinate temperature increases during the day were found in some areas of the building. Many of the air handling units had inoperable or closed main outside air dampers. Maintenance was poor. Improperly maintained or poorly draining condesate pans, renovation of the building without upgrading the ventilation systems and insufficient maintenance personnel were some of the problems identified. The authors conclude that the potential for thermal comfort problems and microbial contamination existed. The authors recommend measures to remedy these situations.

Klein, M.; Gunter, B.

1991-09-01T23:59:59.000Z

219

Innovative Regulatory and Technical Approaches for the U.S. Army Corp of Engineers' Linde FUSRAP Site Remediation  

SciTech Connect (OSTI)

The U.S. Department of Energy (USDOE) created the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 to identify, investigate, and cleanup or control radiological contamination at sites used by the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) from the 1940s through the 1960s. The USDOE had identified 46 sites in the program and finished remediation at 24 of the smaller ones before the end of 1997. With the passage of the Energy and Water Resources Appropriation Act of 1998 the United States Army Corps of Engineers (USACE) was designated by Congress with responsibility to manage and execute the FUSRAP. The Linde Site located in Tonawanda, New York was operated by the MED from 1942-1946 to extract uranium from several high-grade ores. This natural uranium was subsequently enriched in U-235 elsewhere in the United States and ultimately used to produce energy or weapons. Though in the process of reviewing alternative disposal options by 1995, the USDOE had operated FUSRAP with a strategy requiring virtually all materials remediated be disposed of at only one Nuclear Regulatory Commission licensed facility. The change in management of the FUSRAP in 1997 allowed the disposal policy of low levels of radioactively contaminated materials found at the remaining sites to be reexamined. This paper presents some of the innovative regulatory and technical approaches employed at the Linde Site that are resulting in project cost savings while meeting applicable or relevant and appropriate requirements as well as fulfilling commitments made to the local community.

Pitts, J. T.; Coutts, P. W.; Franz, J.; Boyle, J. D.; Rogers, B. C.

2002-02-27T23:59:59.000Z

220

Background chemistry for chemical warfare agents and decontamination processes in support of delisting waste streams at the U.S. Army Dugway Proving Ground, Utah  

SciTech Connect (OSTI)

The State of Utah, Department of Environmental Quality (DEQ), Division of Solid and Hazardous Waste (DSHW), has declared residues resulting from the demilitarization, treatment, cleanup, and testing of military chemical agents to be hazardous wastes. These residues have been designated as corrosive, reactive, toxic, and acute hazardous (Hazardous Waste No. F999). The RCRA regulations (40 Code of Federal Regulations [CFR] 260-280), the Utah Administrative Code (R-315), and other state hazardous waste programs list specific wastes as hazardous but allow generators to petition the regulator to {open_quotes}delist,{close_quotes} if it can be demonstrated that such wastes are not hazardous. The U.S. Army Test and Evaluation Command (TECOM) believes that certain categories of F999 residues are not hazardous and has obtained assistance from Argonne National Laboratory (Argonne) to make the delisting demonstration. The objective of this project is to delist chemical agent decontaminated residues resulting from materials testing activities and to delist a remediation residue (e.g., contaminated soil). To delist these residues, it must be demonstrated that the residues (1) do not contain hazardous quantities of the listed agents; (2) do not contain hazardous quantities of constituents listed in 40 CFR Part 261, Appendix VIII; (3) do not exhibit other characteristics that could define the residues as hazardous; and (4) do not fail a series of acute toxicity tests. The first phase will focus on a subset of the F999 wastes generated at the U.S. Army Dugway Proving Ground (DPG), where the Army tests the effects of military chemical agents and agent-decontamination procedures on numerous military items. This effort is identified as Phase I of the Delisting Program. Subsequent phases will address other DPG chemical agent decontaminated residues and remediation wastes and similar residues at other installations.

Rosenblatt, D.H.; Small, M.J.; Kimmell, T.A.; Anderson, A.W.

1996-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Bagdad Plant  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: Scope ChangeL-01-06Hot-Humid- EngineB2Bagdad Plant 585 Silicon

222

Educating the Army's Jedi  

E-Print Network [OSTI]

This dissertation examines the decisions taken during the development of the concept for the School of Advanced Military Studies and its subsequent refinement in the first ten years of its history. The other line of inquiry ...

Benson, Kevin Charles

2010-09-22T23:59:59.000Z

223

Army Energy Security Considerations  

Broader source: Energy.gov (indexed) [DOE]

China, 1.4 mbd increase in India. Hurricanes Katrina and Rita shut down 27% of US oil refining capacity, production is still off 400,000 barrels per day. US oil imports increasing:...

224

Army Guidance for UESCs  

Broader source: Energy.gov (indexed) [DOE]

Available * Measurement & Verification * Additional Considerations o O&M o Fuel-Neutral Approach o Partnering o Bundling o Other 7 of 11 Randy Smidt DAIM-ODF-E (703)...

225

GLOSSARY: ARMY RANK, ACRONYMS,  

E-Print Network [OSTI]

by a relentless insurgency and by a horrific expansion of sectarian violence between Sunni and Shia factions

Kasman, Alex

226

Korean Army Hat  

E-Print Network [OSTI]

lightly. Psy ended up doing his military service twice because he apparently neglected his duties. The Gangnam Style rocker was clearly a little too at ease. #SouthKorea #Hacker #CEAS...

Hacker, Randi

2013-08-14T23:59:59.000Z

227

China's Dream Army  

E-Print Network [OSTI]

Study of Innovation and Technology in China AN IGCC PROJECTleaders/21577070-vision-chinas- new-president-should-serve-In Case You Missed It: China Dream. ” The China Beat, April

MILLER, Joseph

2013-01-01T23:59:59.000Z

228

Army Regulation 38510 Headquarters  

E-Print Network [OSTI]

(para 23-6). o Clarifies policy for decommissioning sites with Nuclear Regulatory Commission licensed sites (para 24-3a). o Adds policy for closure requirements on the radiological decommissioning of areas

US Army Corps of Engineers

229

Environment US Army Corps  

E-Print Network [OSTI]

, partners test for Asian carp DNA District site attracts birds, birders Renewable energy push Partnership assignments running the gamut from ones devoted to wind, contract methods, solar thermal energy, converting

US Army Corps of Engineers

230

US Army Corps  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C.Green River,The Secretaryat

231

Evaluation of the utility and energy monitoring and control system installed at the US Army, Europe, 409th Base Support Battalion, Military Community at Grafenwoehr, Germany  

SciTech Connect (OSTI)

Under the provisions of Interagency Agreement DOE 1938-B090-A1 between the US Department of Energy (DOE) and the US Army Europe (USAREUR), Martin Marietta Energy Systems, Inc., is providing technical assistance to USAREUR in the areas of computer science, information engineering, energy studies, and engineering and systems development. One of the initial projects authorized under this interagency agreement is the evaluation of utility and energy monitoring and control systems (UEMCSs) installed at selected US Army installations in Europe. This report is an evaluation of the overall energy-conservation effectiveness and use of the UEMCS at the 409th Base Support Battalion located in Grafenwoehr, Germany. The 409th Base Support Battalion is a large USAREUR military training facility that comprises a large training area, leased housing, the main post area, and the camp areas that include Camps Aachen, Algier, Normandy, Cheb, and Kasserine. All of these facilities are consumers of electrical and thermal energy. However, only buildings and facilities in the main post area and Camps Aachen, Algier, and Normandy are under the control of the UEMCS. The focus of this evaluation report is on these specific areas. Recommendations to further increase energy and cost savings and to improve operation of the UEMCS are proposed.

Broders, M.A.; Ruppel, F.R.

1993-05-01T23:59:59.000Z

232

Plant Operational Status - Pantex Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNews & Blog »Physics PhysicsWeek »Plant

233

AQUATIC PLANT CONTROL RESEARCH PROGRAM  

E-Print Network [OSTI]

IS OBSOLETEDO FORM 1473IJ_'13 Unclassified SECURITY CLASSIFICATION OF THIS PA:>E (WIt"" Oil/II En/ered) #12 of the use of such ommf;1rClal produr:ts. #12;Unclassified SECURITY CLASSIFICATION OF THIS PAGE (WIlen D of Engineers, U. S. Army 13. NUMBER OF PAGES Washington, D. C. 20314 83 15. SECURITY CLASS. (ot this report

US Army Corps of Engineers

234

Nutritional status and random blood glucose, cholesterol and triglyceride test among Malaysian Army (MA) personnel in Kuala Lumpur  

SciTech Connect (OSTI)

With the rising trend of obesity among the general population, it is also important to assess the obesity and health status among military population. The aim of this study was to determine the prevalence of overweight and obesity among Malaysian Army (MA) personnel as well as the relationship between selected socio-demographics factors, antropometric profiles, body composition and random blood test value. A cross sectional study involving 378 male military personnel aged between 20 to 48 years old was conducted at two MA bases in Kuala Lumpur between November and December 2012. Antropometric measurements included height, weight and waist circumference (WC). Body fat percentage was measured using bioelectrical impedance analysis method (Tanita TBF-300A). Mean height, weight, BMI, WC, body fat percentage, age, monthly income and duration of service were 1.71 ± 0.6 m, 71.7 ± 12.2 kg, 24.6 ± 4.1 kg/m{sup 2}, 87.0 ± 10.0 cm, 23.4 ± 6.6%, 29.1 ± 5.5 years, RM 2115.12 ± 860.70 and 9.9 ± 5.6 years respectively. According to WHO (1998) classification of BMI, 3.2% of the subjects were underweight, 54.8% normal, 32.8% overweight and 9.3% obese. It was obeserved that 40.2% of the subjects had waist circumference value of 90 cm or more and were considered high risk for diebetes and cardiovascular diseases. This study found that BMI was highly correlated with weight (r=0.925, p<0.05), WC (r=0.852, p<0.05) and body fat percentage. Body fat percentage also show high correlation with weight (r=0.759, p<0.05) and WC (r=0.768, p<0.05. The result from 173 of 378 subjects that were selected for random blood test found that 4.6%, 3.5% and 26.0% had diabetes, high cholesterol and high triglyceride respectively. There was a weak correlation between random blood glucose level with weight (r=0.221, p<0.05), BMI (r=0.243, p<0.05), WC (r=0.298, p<0.05), body fat percentage (r=0.163, p<0.05) and age (r=0.223, p<0.05). Random blood cholesterol level had significant correlation with weight (r=0.284, p<0.05), BMI (r=0.260, p<0.05), WC (r=0.362, p<0.05) and body fat percentage (r=0.313, p<0.05). It was also noted that random blood triglyceride level was significantly correlated with weight (r=0.223, p<0.05), BMI (r=0.312, p<0.05), WC (r=0.288, p<0.05), body fat percentage (r=0.287, p<0.05) and age (r=0.268 p<0.05). These results call for attention to the existence of overweight and obesity as well as the risk of non-communicable diseases among military population. Therefore, future intervention from the aspect of nutritional education and health awareness can benefit thus optimizing the health status of MA military personnel.

Nadiy, I.; Razalee, S.; Zalifah, M. K. [Nutrition Programme, School of Chemical Sciences and Food Technology, Faculty of Science and Technology, Universiti Kebangsaan Malaysia,43600, Selangor (Malaysia); Zulkeffeli, M. J. [Department of Health Service, Ministry of Defense, Level 11, Menara Park, 50450 (Malaysia)

2013-11-27T23:59:59.000Z

235

Site-specific earthquake response analysis for Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report  

SciTech Connect (OSTI)

The Paducah Gaseous Diffusion Plant (PGDP), owned by the US Department of Energy (DOE) and operated under contract by Martin Marietta Energy systems, Inc., is located southwest of Paducah, Kentucky. An aerial photograph and an oblique sketch of the plant are shown in Figures 1 and 2, respectively. The fenced portion of the plant consists of 748 acres. This plant was constructed in the 1950`s and is one of only two gaseous diffusion plants in operation in the United States; the other is located near Portsmouth, Ohio. The facilities at PGDP are currently being evaluated for safety in response to natural seismic hazards. Design and evaluation guidelines to evaluate the effects of earthquakes and other natural hazards on DOE facilities follow probabilistic hazard models that have been outlined by Kennedy et al. (1990). Criteria also established by Kennedy et al. (1990) classify diffusion plants as ``moderate hazard`` facilities. The US Army Engineer Waterways Experiment Station (WES) was tasked to calculate the site response using site-specific design earthquake records developed by others and the results of previous geotechnical investigations. In all, six earthquake records at three hazard levels and four individual and one average soil columns were used.

Sykora, D.W.; Davis, J.J.

1993-08-01T23:59:59.000Z

236

Waste Treatment Plant Overview  

Office of Environmental Management (EM)

contracted Bechtel National, Inc., to design and build the world's largest radioactive waste treatment plant. The Waste Treatment and Immobilization Plant (WTP), also known as the...

237

Selection guidelines for central heat plant controls. Final report  

SciTech Connect (OSTI)

The operation and control of Central Heating Plants (CHPs) are important factors in maintaining the readiness of U.S. Army installations. Aging CHPs often experience increased interruptions, maintenance difficulties, and inefficient operation. As fuel costs increase, there is a growing need to take advantage of new, emerging control technologies. Microprocessor-based controls can provide opportunities for increased reliability, enhanced safety, better performance monitoring, and cost reduction. However, upgraded control systems cannot compensate for a boiler in poor mechanical condition. Any proposed control systems upgrade must be preceded by a mechanical assessment of the boiler. These CHP control guidelines can help installation personnel develop budgetary-cost proposals to upgrade gas/oil-fired boiler controls for gas/oil-fired steam or high temperature hot water (HTHW) systems. These general guidelines provide basic information to evaluate the feasibility of upgrading boiler control systems, and a methodology for developing budget proposals. Judgement is required to develop designs for specific unit and site characteristics, boiler safety codes, and local regulatory requirements. These guidelines do not eliminate the need for competent professional engineers to finalize assessments of existing conditions, to develop a plant control system design that meets existing and new requirements, and to evaluate alternative contractor proposals.

Warner, S.R.; Lin, M.C.; Schandche, G.W.

1994-11-01T23:59:59.000Z

238

NUCLEAR PLANT OPERATIONS AND  

E-Print Network [OSTI]

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Powe

Pázsit, Imre

239

Ethylene insensitive plants  

SciTech Connect (OSTI)

Nucleic acid and polypeptide sequences are described which relate to an EIN6 gene, a gene involved in the plant ethylene response. Plant transformation vectors and transgenic plants are described which display an altered ethylene-dependent phenotype due to altered expression of EIN6 in transformed plants.

Ecker, Joseph R. (Carlsbad, CA); Nehring, Ramlah (La Jolla, CA); McGrath, Robert B. (Philadelphia, PA)

2007-05-22T23:59:59.000Z

240

Plant fatty acid hydroxylases  

DOE Patents [OSTI]

This invention relates to plant fatty acyl hydroxylases. Methods to use conserved amino acid or nucleotide sequences to obtain plant fatty acyl hydroxylases are described. Also described is the use of cDNA clones encoding a plant hydroxylase to produce a family of hydroxylated fatty acids in transgenic plants. In addition, the use of genes encoding fatty acid hydroxylases or desaturases to alter the level of lipid fatty acid unsaturation in transgenic plants is described.

Somerville, Chris (Portola Valley, CA); Broun, Pierre (Burlingame, CA); van de Loo, Frank (Lexington, KY)

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

A resource allocation algorithm for wide area search ammunitions  

E-Print Network [OSTI]

The objective of this research is to design a decision algorithm to assign weapons (or vehicles) with the appropriate mode of operation to search, classify and attack as many targets as possible. This work also presents the benefits of cooperation...

Rathinam, Sivakumar

2001-01-01T23:59:59.000Z

242

DOE - Office of Legacy Management -- Navy Ammunition Depot - NJ 15  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are herePA 3003A AECMexico -36

243

Technology Data for Energy Plants June 2010  

E-Print Network [OSTI]

............................................................................................... 79 13 Centralised Biogas Plants

244

Plant Phenotype Characterization System  

SciTech Connect (OSTI)

This report is the final scientific report for the DOE Inventions and Innovations Project: Plant Phenotype Characterization System, DE-FG36-04GO14334. The period of performance was September 30, 2004 through July 15, 2005. The project objective is to demonstrate the viability of a new scientific instrument concept for the study of plant root systems. The root systems of plants are thought to be important in plant yield and thus important to DOE goals in renewable energy sources. The scientific study and understanding of plant root systems is hampered by the difficulty in observing root activity and the inadequacy of existing root study instrumentation options. We have demonstrated a high throughput, non-invasive, high resolution technique for visualizing plant root systems in-situ. Our approach is based upon low-energy x-ray radiography and the use of containers and substrates (artificial soil) which are virtually transparent to x-rays. The system allows us to germinate and grow plant specimens in our containers and substrates and to generate x-ray images of the developing root system over time. The same plant can be imaged at different times in its development. The system can be used for root studies in plant physiology, plant morphology, plant breeding, plant functional genomics and plant genotype screening.

Daniel W McDonald; Ronald B Michaels

2005-09-09T23:59:59.000Z

245

Plant centromere compositions  

DOE Patents [OSTI]

The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

Mach, Jennifer M. (Chicago, IL); Zieler, Helge (Del Mar, CA); Jin, RongGuan (Chesterfield, MO); Keith, Kevin (Three Forks, MT); Copenhaver, Gregory P. (Chapel Hill, NC); Preuss, Daphne (Chicago, IL)

2011-08-02T23:59:59.000Z

246

Plant centromere compositions  

DOE Patents [OSTI]

The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

Mach, Jennifer (Chicago, IL); Zieler, Helge (Chicago, IL); Jin, RongGuan (Chicago, IL); Keith, Kevin (Chicago, IL); Copenhaver, Gregory (Chapel Hill, NC); Preuss, Daphne (Chicago, IL)

2007-06-05T23:59:59.000Z

247

Plant centromere compositions  

DOE Patents [OSTI]

The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

2006-10-10T23:59:59.000Z

248

Plant centromere compositions  

DOE Patents [OSTI]

The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

Mach, Jennifer (Chicago, IL); Zieler, Helge (Chicago, IL); Jin, James (Chicago, IL); Keith, Kevin (Chicago, IL); Copenhaver, Gregory (Chapel Hill, NC); Preuss, Daphne (Chicago, IL)

2006-06-26T23:59:59.000Z

249

Plant centromere compositions  

DOE Patents [OSTI]

The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

Mach; Jennifer M. (Chicago, IL), Zieler; Helge (Del Mar, CA), Jin; RongGuan (Chesterfield, MO), Keith; Kevin (Three Forks, MT), Copenhaver; Gregory P. (Chapel Hill, NC), Preuss; Daphne (Chicago, IL)

2011-11-22T23:59:59.000Z

250

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid  

SciTech Connect (OSTI)

This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

Warwick, William M.

2010-09-30T23:59:59.000Z

251

Poisonous Plant Management.  

E-Print Network [OSTI]

. Carefully examine plants being grazed. Generally, a Significant quantity of toxic plant must be consumed to be lethaL Many times these plants are readily identified in the field by evidence of grazing. Also helpful at this time is a rumen sample... poisonous plants were most severe at heavy stocking rates, while few losses occurred at light stocking levels. Death ? losses were also directly related to kinds or combinations of livestock being grazed. When combinations of cattle, sheep and goats...

McGinty, Allan

1985-01-01T23:59:59.000Z

252

Plant design: Integrating Plant and Equipment Models  

SciTech Connect (OSTI)

Like power plant engineers, process plant engineers must design generating units to operate efficiently, cleanly, and profitably despite fluctuating costs for raw materials and fuels. To do so, they increasingly create virtual plants to enable evaluation of design concepts without the expense of building pilot-scale or demonstration facilities. Existing computational models describe an entire plant either as a network of simplified equipment models or as a single, very detailed equipment model. The Advanced Process Engineering Co-Simulator (APECS) project (Figure 5) sponsored by the U.S. Department of Energy's National Energy Technology Laboratory (NETL) seeks to bridge the gap between models by integrating plant modeling and equipment modeling software. The goal of the effort is to provide greater insight into the performance of proposed plant designs. The software integration was done using the process-industry standard CAPE-OPEN (Computer Aided Process Engineering–Open), or CO interface. Several demonstration cases based on operating power plants confirm the viability of this co-simulation approach.

Sloan, David (Alstrom Power); Fiveland, Woody (Alstrom Power); Zitney, S.E.; Osawe, Maxwell (Ansys, Inc.)

2007-08-01T23:59:59.000Z

253

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

254

NUCLEAR PLANT AND CONTROL  

E-Print Network [OSTI]

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: software require- ments, safety analysis, formal for the digital protection systems of a nuclear power plant. When spec- ifying requirements for software and CRSA processes are described using shutdown system 2 of the Wolsong nuclear power plants as the digital

255

Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.  

SciTech Connect (OSTI)

This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

Brouns, Thomas M.

2007-07-15T23:59:59.000Z

256

Conditional sterility in plants  

DOE Patents [OSTI]

The present disclosure provides methods, recombinant DNA molecules, recombinant host cells containing the DNA molecules, and transgenic plant cells, plant tissue and plants which contain and express at least one antisense or interference RNA specific for a thiamine biosynthetic coding sequence or a thiamine binding protein or a thiamine-degrading protein, wherein the RNA or thiamine binding protein is expressed under the regulatory control of a transcription regulatory sequence which directs expression in male and/or female reproductive tissue. These transgenic plants are conditionally sterile; i.e., they are fertile only in the presence of exogenous thiamine. Such plants are especially appropriate for use in the seed industry or in the environment, for example, for use in revegetation of contaminated soils or phytoremediation, especially when those transgenic plants also contain and express one or more chimeric genes which confer resistance to contaminants.

Meagher, Richard B. (Athens, GA); McKinney, Elizabeth (Athens, GA); Kim, Tehryung (Taejeon, KR)

2010-02-23T23:59:59.000Z

257

PHYSICAL PLANT POLICY & PROCEDURE  

E-Print Network [OSTI]

PHYSICAL PLANT POLICY & PROCEDURE TITLE PHYSICAL PLANT HIGH VOLTAGE PREVENTIVE MAINTENANCE OBJECTIVE AND PURPOSE To establish a consistent policy of performing Preventive Maintenance on high voltage by the G.S.A. Preventive Maintenance sections E- 29 (high voltage oil circuit breaker), E-32 (high voltage

Fernandez, Eduardo

258

Plant fatty acid hydroxylase  

DOE Patents [OSTI]

The present invention relates to the identification of nucleic acid sequences and constructs, and methods related thereto, and the use of these sequences and constructs to produce genetically modified plants for the purpose of altering the composition of plant oils, waxes and related compounds.

Somerville, Chris (Portola Valley, CA); van de Loo, Frank (Lexington, KY)

2000-01-01T23:59:59.000Z

259

Modulating lignin in plants  

DOE Patents [OSTI]

Materials and methods for modulating (e.g., increasing or decreasing) lignin content in plants are disclosed. For example, nucleic acids encoding lignin-modulating polypeptides are disclosed as well as methods for using such nucleic acids to generate transgenic plants having a modulated lignin content.

Apuya, Nestor; Bobzin, Steven Craig; Okamuro, Jack; Zhang, Ke

2013-01-29T23:59:59.000Z

260

Plant Ecology An Introduction  

E-Print Network [OSTI]

1 Plant Ecology An Introduction Ecology as a Science Study of the relationships between living and causes of the abundance and distribution of organisms Ecology as a Science We'll use the perspective of terrestrial plants Basic ecology - ecological principles Applied ecology - application of principles

Cochran-Stafira, D. Liane

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

RESEARCH ARTICLE PLANT GENETICS  

E-Print Network [OSTI]

relative) in the Brassicaceae plant family is determined by the genotype of the plant at the self-incompatibility-locus phenotype in a self-incompatible Arabidopsis species. Selection has created a dynamic repertoire of s of regulation among alleles. S porophytic self-incompatibility (SI) is a genetic system that evolved in hermaph

Napp, Nils

262

NUCLEAR PLANT OPERATIONS AND  

E-Print Network [OSTI]

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed absorption cross-section behavior. Consequently, if NUCLEAR TECHNOLOGY VOL. 140 NOV. 2002 147 #12;Demazière

Demazière, Christophe

263

NUCLEAR PLANT OPERATIONS AND  

E-Print Network [OSTI]

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper- ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed. Consequently, if*E-mail: demaz@nephy.chalmers.se NUCLEAR TECHNOLOGY VOL. 140 NOV. 2002 147 #12;high-burnup fuel

Pázsit, Imre

264

Top 10 plant pathogenic bacteria in molecular plant pathology.  

E-Print Network [OSTI]

plants are being closely grouped together, for example pv.oryzae pv. oryzae AvrXa21 and implications for plant innatePseudomonas syringae pv. tomato in Tanzania. Plant Dis. 91,

2012-01-01T23:59:59.000Z

265

First Army First Army, commanded by Lt. Gen. Mick  

E-Print Network [OSTI]

Guire-Dix-Lakehurst, Camp Atterbury, Camp Shelby, Fort Knox, Fort McCoy, Fort Hood, Fort Bliss and Joint Base Lewis divisions (Division East at Fort Meade, Md., and Division West at Fort Hood, Texas), 16 training support brigades (TSBs) located at mobilization training cen 2 #12;3 ters (Fort Stewart, Joint Base Mc

266

Calibration of Cotton Planting Mechanisms.  

E-Print Network [OSTI]

per foot. To obtain a perfect stand of one plant to Foot, a minimum of 1 to a maximum of 11 plants per foot wonld have to be thinned out. The number for picker wheel- drop planting mechanisms ranged from a minimum of 2 to a maxi- mum of 27 plants... per foot, requiring the removal of from 1 to 26 nlants per foot to leave one plant per foot. CONTENTS Introduction History of cotton planter development ------------.---------------------------------- Cottonseed planting mechanisms Requirements...

Smith, H. P. (Harris Pearson); Byrom, Mills H. (Mills Herbert)

1936-01-01T23:59:59.000Z

267

Process Improvement at Army Installations  

E-Print Network [OSTI]

recommendations are for the Fill and Press line where most of the Level I focused LESSONS LEARNED On completion of the project, the researchers assessed the results and some of the 198 ESL-IE-97-04-31 Proceedings from the Nineteenth Industrial Energy.... Finally, the energy issues included initiate an energy team; install energy efficient lighting; and decommission unused steam lines. After the first cost, savings, and simple payback time was calculated for all of the proposed improvements, a...

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

268

US Army Corps of Engineers  

E-Print Network [OSTI]

the Petroleum, Oil and Lubricants Storage Tank, and Phase 2 of the Maintenance Complex Accessory Shop. With all, the upgrade of electrical system and natural gas system and Barracks and Dining Facility projects are well

US Army Corps of Engineers

269

Army Energy Security and Independence  

Broader source: Energy.gov (indexed) [DOE]

of oil currently estimated to be in the ground. Non-traditional oil sources, such as oil shale, tar sands and heavy crude, are now more marketable due to advances in technology,...

270

ARMY SERiWE FORCES  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r. aw wL2--\ AP R 2

271

ARMY Opportunities | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartment of Energy 601 High IntegrityEnergy ( ARI ) AssetARKANSASARMY

272

Army Regulation 4201 Facilities Engineering  

E-Print Network [OSTI]

and management, mil- itary construction program development and execution, master planning, utilities services of the United States for use by the National Guard; single project-owned or leased civil works facilities as tenants when support is provided by another government agency. In areas outside the United States, Status

US Army Corps of Engineers

273

Virginia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

274

Ohio Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Ohio nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

275

Arkansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

276

Michigan Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

277

California Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

California nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

278

Alabama Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

279

Texas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

280

Pennsylvania Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Pennsylvania nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Tennessee Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

282

Georgia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

283

Nebraska Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Nebraska nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

284

Arizona Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

285

Connecticut Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Connecticut nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

286

Maryland Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

287

Illinois Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

288

Florida Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Florida nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

289

Wisconsin Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Wisconsin nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

290

Minnesota Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Minnesota nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

291

Nuclear Power Plant Design Project  

E-Print Network [OSTI]

Nuclear Power Plant Design Project A Response to the Environmental and Economic Challenge Of Global.............................................................................................................. 4 3. Assessment of the Issues and Needs for a New Plant

292

30 May 2012 Version Emergency Power Facility Assessment Tool (EPFAT)  

E-Print Network [OSTI]

, such as water treatment plants, hospitals, wastewater treatment plants and shelters. The U.S. Army Corps

US Army Corps of Engineers

293

Plant Vascular Biology 2010  

SciTech Connect (OSTI)

This grant supported the Second International Conference on Plant Vascular Biology (PVB 2010) held July 24-28, 2010 on the campus of Ohio State University, Columbus, Ohio. Biao Ding (Ohio State University; OSU) and David Hannapel (Iowa State University; ISU) served as co-chairs of this conference. Biao Ding served as the local organizer. PVB is defined broadly here to include studies on the biogenesis, structure and function of transport systems in plants, under conditions of normal plant growth and development as well as of plant interactions with pathogens. The transport systems cover broadly the xylem, phloem, plasmodesmata and vascular cell membranes. The PVB concept has emerged in recent years to emphasize the integrative nature of the transport systems and approaches to investigate them.

Ding, Biao

2014-11-17T23:59:59.000Z

294

Geothermal Demonstration Plant  

Office of Scientific and Technical Information (OSTI)

a 50 W e binary conversion plant at Heber was initiated and is presented herein. Chevron Oil Company (the field operator) predicts that the reservoir i ill decline from an initial...

295

Plant Operations Executive Director  

E-Print Network [OSTI]

Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

Awtar, Shorya

296

B Plant facility description  

SciTech Connect (OSTI)

Buildings 225B, 272B, 282B, 282BA, and 294B were removed from the B Plant facility description. Minor corrections were made for tank sizes and hazardous and toxic inventories.

Chalk, S.E.

1996-10-04T23:59:59.000Z

297

Plant Site Refrigeration Upgrade  

E-Print Network [OSTI]

Bayer Corporation operates a multi-division manufacturing facility in Bushy Park, South Carolina. Low temperature refrigeration (-4°F) is required by many of the chemical manufacturing areas and is provided by a Plant Site Refrigeration System...

Zdrojewski, R.; Healy, M.; Ramsey, J.

298

Behavior-based rules for fitness-for-duty assessment of nuclear power plant personnel  

SciTech Connect (OSTI)

The safe and reliable operation of nuclear power plants requires that plant personnel not be under the influence of any substance, legal or illegal, or mentally or physically impaired from any cause that in any way adversely affects their ability to safely and competently perform their duties. This goal has been formalized by the US Nuclear Regulatory Commission in their proposed rule for a fitness-for-duty program. The purpose of this paper is to describe a performance-based tool based on surrogate tests and dose equivalency methodologies that is a viable candidate for fitness-for-duty assessment. The automated performance test system (APTS) is a microcomputer-based human performance test battery that has been developed over a decade of research supported variously by the National Science Foundation, National Aeronautics and Space Administration, US Department of Energy, and the US Navy and Army. Representing the most psychometrically sound test from evaluations of over 150 well-known tests of basic psychomotor and cognitive skills, the battery provides direct prediction of a worker's fitness for duty. Twenty-four tests are suitable for use, and a dozen have thus far been shown to be sensitive to the effects of legal and illegal drugs, alcohol, fatigue, stress, and other causes of impairment.

Kennedy, R.S.; Turnage, J.J.; Price, H.E.; Lane, N.E.

1989-01-01T23:59:59.000Z

299

GEOTHERMAL POWER GENERATION PLANT  

SciTech Connect (OSTI)

Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196oF resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

Boyd, Tonya

2013-12-01T23:59:59.000Z

300

Pinellas Plant facts  

SciTech Connect (OSTI)

The Pinellas Plant, near St. Petersburg, Florida, is wholly owned by the United States Government. It is operated for the Department of Energy (DOE) by GE Aerospace, Neutron Devices (GEND). This plant was built in 1956 to manufacture neutron generators, a principal component in nuclear weapons. The neutron generators built at Neutron Devices consist of a miniaturized linear ion accelerator assembled with the pulsed electrical power supplies required for its operation. Production of these devices has necessitated the development of several uniquely specialized areas of competence and supporting facilities. The ion accelerator, or neutron tube, requires ultra clean, high vacuum technology; hermetic seals between glass, ceramic, glass-ceramic, and metal materials; plus high voltage generation and measurement technology. The existence of these capabilities at Neutron Devices has led directly to the assignment of other weapon application products: the lightning arrester connector, specialty capacitor, vacuum switch, and crystal resonator. Other product assignments such as active and reserve batteries and the radioisotopically-powered thermoelectric generator evolved from the plant`s materials measurement and controls technologies which are required to ensure neutron generator life.

NONE

1990-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Native Vegetation Planting Guidelines  

E-Print Network [OSTI]

1 Native Vegetation Planting Guidelines Based on Sustainability Goals for the Macquarie Campus #12.................................................................................................................................10 4.2.5 Shale-Sandstone soil transition...................................................................................................................................11 #12;3 1. Purpose This document provides a guideline for specific grounds management procedures

Wang, Yan

302

Alex Benson Cement Plants  

E-Print Network [OSTI]

with steel balls which grind mix into a fine powder -> Final Cement Product Associated Air Pollution: o From health effects Relative News; o "EPA Clamps down on Cement Plant Pollution" http.4 million dollars for violating the Clean Air Act and 2 million dollars for pollution controls #12

Toohey, Darin W.

303

B Plant hazards assessment  

SciTech Connect (OSTI)

This document establishes the technical basis in support of Emergency Planning Activities for B Plant on the Hanford Site. The document represents an acceptable interpretation of the implementing guidance document for DOE Order 5500.3A. Through this document, the technical basis for the development of facility specific , Emergency Action Levels and the Emergency Planning Zone is demonstrated.

Broz, R.E.

1994-09-23T23:59:59.000Z

304

Steam Plant, 6% Irrigation,  

E-Print Network [OSTI]

of Rainwater Storage Cisterns on Campus 150,000 gallons* Total Acres of Campus (Modeled for Stormwater Analysis% Chilled Water Plant, 26% Academics, 16% Washington Duke Inn, 3% Water & Stormwater Management Sustainability Facts Overview Existing Sustainability Initiatives Stormwater Regulation Duke University obtains

Zhou, Pei

305

Technology Data for Electricity and Heat Generating Plants  

E-Print Network [OSTI]

.................................................................................63 13 Centralised Biogas Plants

306

Ecology of Plants and Light CAM plants have thick,  

E-Print Network [OSTI]

orientation to maximize light exposure. Species Adaptations-Sun Solar tracking by leaves increases light1 Ecology of Plants and Light CAM plants have thick, succulent tissues to allow for organic acid and Light Some CAM plants not obligated to just CAM Can use C3 photosynthesis during day if conditions

Cochran-Stafira, D. Liane

307

The Colorado Rare Plant Technical Committee Rare Plant Symposium  

E-Print Network [OSTI]

The Colorado Rare Plant Technical Committee presents: 4th Annual Rare Plant Symposium Sponsored by: Colorado Native Plant Society University of Colorado Herbarium US Fish and Wildlife Service Colorado: G2G3/S2S3 Global distribution: Colorado (Larimer and Boulder counties). Possibly extending

308

Louisiana Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant NameTotal Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

309

Belgrade Lot Steam Plant Lot  

E-Print Network [OSTI]

2 2A 2A Belgrade Lot Steam Plant Lot Alfond Lot Satellite Lot North Gym Lot Corbett Lot Dunn Lot Chadbourne Merrill Aubert Hannibal Hamlin Steam Plant Crosby Machine Tool Lab Children's Center Rogers N

Thomas, Andrew

310

Belgrade Lot Steam Plant Lot  

E-Print Network [OSTI]

2 2A 2A Belgrade Lot Steam Plant Lot Alfond Lot Satellite Lot North Gym Lot Corbett Lot Dunn Lot Hamlin Steam Plant Crosby Machine Tool Lab Children's Center Rogers N S Estabrooke Memorial Gym Stevens

Thomas, Andrew

311

Belgrade Lot Steam Plant Lot  

E-Print Network [OSTI]

2 2A 2A Belgrade Lot Steam Plant Lot Alfond Lot Satellite Lot North Gym Lot Corbett Lot Dunn Lot Oceanographic Operations 1 2 8 5 3 4 7 6 AMC Chadbourne Merrill Aubert Hannibal Hamlin Steam Plant Crosby

Thomas, Andrew

312

Gene encoding plant asparagine synthetase  

DOE Patents [OSTI]

The identification and cloning of the gene(s) for plant asparagine synthetase (AS), an important enzyme involved in the formation of asparagine, a major nitrogen transport compound of higher plants is described. Expression vectors constructed with the AS coding sequence may be utilized to produce plant AS; to engineer herbicide resistant plants, salt/drought tolerant plants or pathogen resistant plants; as a dominant selectable marker; or to select for novel herbicides or compounds useful as agents that synchronize plant cells in culture. The promoter for plant AS, which directs high levels of gene expression and is induced in an organ specific manner and by darkness, is also described. The AS promoter may be used to direct the expression of heterologous coding sequences in appropriate hosts.

Coruzzi, Gloria M. (New York, NY); Tsai, Fong-Ying (New York, NY)

1993-10-26T23:59:59.000Z

313

Post-closure permit application for the Kerr Hollow Quarry at the Y-12 plant  

SciTech Connect (OSTI)

The Kerr Hollow Quarry (KHQ) is located on U.S. Department of Energy (DOE) property at the Y-12 Plant, Oak Ridge, Tennessee. The Oak Ridge Y-12 Plant was built by the U.S. Army Corps of Engineers in 1943 as part of the Manhattan Project. Until 1992, the primary mission of the Y-12 Plant was the production and fabrication of nuclear weapons components. Activities associated with these functions included production of lithium compounds, recovery of enriched uranium from scrap material, and fabrication of uranium and other materials into finished parts for assemblies. The Kerr Hollow Quarry was used for waste disposal of a variety of materials including water-reactive and shock-sensitive chemicals and compressed gas cylinders. These materials were packaged in various containers and sank under the water in the quarry due to their great weight. Disposal activities were terminated in November, 1988 due to a determination by the Tennessee Department of Environment and Conservation that the quarry was subject to regulations under the Resource Conservation and Recovery Act of 1993. Methods of closure for the quarry were reviewed, and actions were initiated to close the quarry in accordance with closure requirements for interim status surface impoundments specified in Tennessee Rules 1200-1-11-.05(7) and 1200-1-11-.05(11). As part of these actions, efforts were made to characterize the physical and chemical nature of wastes that had been disposed of in the quarry, and to remove any containers or debris that were put into the quarry during waste disposal activities. Closure certification reports (Fraser et al. 1993 and Dames and Moore 1993) document closure activities in detail. This report contains the post-closure permit application for the Kerr Hollow Quarry site.

NONE

1995-06-01T23:59:59.000Z

314

Regulating nutrient allocation in plants  

DOE Patents [OSTI]

The invention provides coding and promoter sequences for a VS-1 and AP-2 gene, which affects the developmental process of senescence in plants. Vectors, transgenic plants, seeds, and host cells comprising heterologous VS-1 and AP-2 genes are also provided. Additionally provided are methods of altering nutrient allocation and composition in a plant using the VS-1 and AP-2 genes.

Udvardi, Michael; Yang, Jiading; Worley, Eric

2014-12-09T23:59:59.000Z

315

CONSTRUCTION OF NUCLEAR POWER PLANTS  

E-Print Network [OSTI]

CONSTRUCTION OF NUCLEAR POWER PLANTS A Workshop on "NUCLEAR ENERGY RENAISSANCE" Addressing WAS DEEPLY INVOLVED IN ALMOST EVERY ASPECT OF BUILDING THE PLANTS THROUGH · Quality Assurance · Nuclear IN CONSTRUCTION OF ST. LUCIE-2 #12;LESSONS LEARNED FROM St. Lucie-2 NUCLEAR POWER PLANTS CAN BE BUILT

316

Integrated turbomachine oxygen plant  

SciTech Connect (OSTI)

An integrated turbomachine oxygen plant includes a turbomachine and an air separation unit. One or more compressor pathways flow compressed air from a compressor through one or more of a combustor and a turbine expander to cool the combustor and/or the turbine expander. An air separation unit is operably connected to the one or more compressor pathways and is configured to separate the compressed air into oxygen and oxygen-depleted air. A method of air separation in an integrated turbomachine oxygen plant includes compressing a flow of air in a compressor of a turbomachine. The compressed flow of air is flowed through one or more of a combustor and a turbine expander of the turbomachine to cool the combustor and/or the turbine expander. The compressed flow of air is directed to an air separation unit and is separated into oxygen and oxygen-depleted air.

Anand, Ashok Kumar; DePuy, Richard Anthony; Muthaiah, Veerappan

2014-06-17T23:59:59.000Z

317

Jennings Demonstration PLant  

SciTech Connect (OSTI)

Verenium operated a demonstration plant with a capacity to produce 1.4 million gallons of cellulosic ethanol from agricultural resiues for about two years. During this time, the plant was able to evaluate the technical issues in producing ethanol from three different cellulosic feedstocks, sugar cane bagasse, energy cane, and sorghum. The project was intended to develop a better understanding of the operating parameters that would inform a commercial sized operation. Issues related to feedstock variability, use of hydrolytic enzymes, and the viability of fermentative organisms were evaluated. Considerable success was achieved with pretreatment processes and use of enzymes but challenges were encountered with feedstock variability and fermentation systems. Limited amounts of cellulosic ethanol were produced.

Russ Heissner

2010-08-31T23:59:59.000Z

318

Radiological Survey of the U. S. Army Reserve Property at the Weldon Spring Site. Final Report. IR-300-302-1.02.  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -Miami -NewPlantSteel Co -Sites »

319

Pinellas Plant Environmental Baseline Report  

SciTech Connect (OSTI)

The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

Not Available

1997-06-01T23:59:59.000Z

320

Texas Plant Diseases Handbook.  

E-Print Network [OSTI]

of the lesion turns brown. With age, 1 es ions en 1 arge and coa 1 esce. The ent i re 1 eaf fi na 11 y drops. Stem lesions appear as long, reddish colored spots. When the plant begins to set fruit, lesions are formed at the nodes \\'Jhich girdle the stem... gi v i ng the 1 eaf a "shot-ho 1 e" appearance, simi 1 ar to those caused by anthracnose. Spots on fruit are usua lly sma 11 er and circul ar in shape. Bacteria overwinter in crop residue and on seed. Hard rains splash the bacteria to stems...

Horne, C. Wendell; Amador, Jose M.; Johnson, Jerral D.; McCoy, Norman L.; Philley, George L.; Lee, Thomas A. Jr.; Kaufman, Harold W.; Jones, Roger K.; Barnes, Larry W.; Black, Mark C.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Propagation of Ornamental Plants.  

E-Print Network [OSTI]

is well filled with roots. In the other types of layering, select shooi 1 of young growth that bend easily. It usuall: is advisable to wound the stem where it is covered with soil. This cut limits free movemen: ! of food materials and induces root... cuttings. lecent research findings have taken much of uesswork out of this type of propagation t now can be done for many plants with rlrative ease by the home gardener. Some alants remain difficult to propagate by any ' method, but most...

DeWerth, A. F.

1955-01-01T23:59:59.000Z

322

Plants & Animals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006Photovoltaic Theory and ModelingPinkand Results Plans,Plants &

323

B Plant - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone byDearTechnicalAwards recognizeStatutes i TableAugustPlant

324

T Plant - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout »LabSustainabilitySynthetic fuelT Plant Projects

325

Nuclear Plant/Hydrogen Plant Safety: Issues and Approaches  

SciTech Connect (OSTI)

The U.S. Department of Energy, through its agents the Next Generation Nuclear Plant Project and the Nuclear Hydrogen Initiative, is working on developing the technologies to enable the large scale production of hydrogen using nuclear power. A very important consideration in the design of a co-located and connected nuclear plant/hydrogen plant facility is safety. This study provides an overview of the safety issues associated with a combined plant and discusses approaches for categorizing, quantifying, and addressing the safety risks.

Steven R. Sherman

2007-06-01T23:59:59.000Z

326

Issues for New Nuclear Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to produce heavy components and nuclear-grade equipment - Transportation of heavy components - Constructionoperation workforce - Cost of new plants Cooling Technology...

327

Pantex Plant Emergency Response Exercise  

Broader source: Energy.gov (indexed) [DOE]

Joint Information Center Emergency Manager Offsite Interface Coordinator DOE Technical Advisor Emergency Press Center Radiation Safety Figure 1. Pantex Plant Emergency Response...

328

Owners of nuclear power plants  

SciTech Connect (OSTI)

Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

Hudson, C.R.; White, V.S.

1996-11-01T23:59:59.000Z

329

Power Plant Modeling and Simulation  

ScienceCinema (OSTI)

The National Energy Technology Laboratory's Office of Research and Development provides open source tools and expetise for modeling and simulating power plants and carbon sequestration technologies.

None

2010-01-08T23:59:59.000Z

330

Plant Importation Importing "Plant Material" From Outside Canada  

E-Print Network [OSTI]

Plant Importation Importing "Plant Material" From Outside Canada 1) Determine whether) If a permit is required from the CFIA* (a division of Agriculture Canada), please go to the CFIA website Agency Canada (PHAC) or the Canadian Food Inspection Agency (CFIA). #12;

331

Managing plant symbiosis: fungal endophyte genotype alters plant community composition  

E-Print Network [OSTI]

Managing plant symbiosis: fungal endophyte genotype alters plant community composition Jennifer A hosts the foliar endophytic fungus, Neotypho- dium coenophialum. We quantified vegetation development of the endophyte (KY-31, AR-542) in two tall fescue cultivars (Georgia-5, Jesup). The KY-31 endophyte produces

Rudgers, Jennifer

332

(Photosynthesis in intact plants)  

SciTech Connect (OSTI)

Progress in the two years since the last renewal application has been excellent. We have made substantial contributions on both main fronts of the projects, and are particularly happy with the progress of our research on intact plants. The approach of basing our field work on a sound foundation of laboratory studies has enabled is to use methods which provide unambiguous assays of well characterized reactions. We have also made excellent progress in several laboratory studies which will have direct applications in future field work, and have introduced to the laboratory a range of molecular genetics techniques which will allow us to explore new options in the attempt to understand function at the level of molecular structure.

Not Available

1990-01-01T23:59:59.000Z

333

Next Generation Geothermal Power Plants  

SciTech Connect (OSTI)

A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine cycle. Results of this study indicate that dual flash type plants are preferred at resources with temperatures above 400 F. Closed loop (binary type) plants are preferred at resources with temperatures below 400 F. A rotary separator turbine upstream of a dual flash plant can be beneficial at Salton Sea, the hottest resource, or at high temperature resources where there is a significant variance in wellhead pressures from well to well. Full scale demonstration is required to verify cost and performance. Hot water turbines that recover energy from the spent brine in a dual flash cycle improve that cycle's brine efficiency. Prototype field tests of this technology have established its technical feasibility. If natural gas prices remain low, a combustion turbine/binary hybrid is an economic option for the lowest temperature sites. The use of mixed fluids appear to be an attractive low risk option. The synchronous turbine option as prepared by Barber-Nichols is attractive but requires a pilot test to prove cost and performance. Dual flash binary bottoming cycles appear promising provided that scaling of the brine/working fluid exchangers is controllable. Metastable expansion, reheater, Subatmospheric flash, dual flash backpressure turbine, and hot dry rock concepts do not seem to offer any cost advantage over the baseline technologies. If implemented, the next generation geothermal power plant concept may improve brine utilization but is unlikely to reduce the cost of power generation by much more than 10%. Colder resources will benefit more from the development of a next generation geothermal power plant than will hotter resources. All values presented in this study for plant cost and for busbar cost of power are relative numbers intended to allow an objective and meaningful comparison of technologies. The goal of this study is to assess various technologies on an common basis and, secondarily, to give an approximate idea of the current costs of the technologies at actual resource sites. Absolute costs at a given site will be determined by the specifics of a given pr

Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

1995-09-01T23:59:59.000Z

334

Refinery, petrochemical plant injuries decline  

SciTech Connect (OSTI)

The National Petroleum Refiners Association (NPRA) reports a 7% reduction in workplace injury and illness incidence rates for refineries in 1993, and a 21% decrease for petrochemical plants. The report summarizes data from 135 of the 162 US member refineries, and 117 of the 172 US member petrochemical plants. This paper summarizes the report findings.

Not Available

1994-07-25T23:59:59.000Z

335

Do Plants Sweat? Core Content  

E-Print Network [OSTI]

in the bright sun and others are grouped together and are regularly sprinkled with water. You begin to wonder plant distribution where you see this principle in action? -Can you predict the effect of seasons data/graph] Three plants are grown in the same greenhouse with the same air temperature, amount

Kessler, Bruce

336

Demil planning and management system  

SciTech Connect (OSTI)

The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C. [Argonne National Lab., IL (United States); Golden, R.E. [Army Pacific, Fort Shafter, HI (United States); Fuller, R. [Army Industrial Operations Command, Rock Island, IL (United States). National Maintenance Point Branch

1997-08-01T23:59:59.000Z

337

Plant maintenance and plant life extension issue, 2007  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

Agnihotri, Newal (ed.)

2007-03-15T23:59:59.000Z

338

Early Entrance Coproduction Plant  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objectives of Phase I were to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The work performed under Phase II will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation.

Mushtaq Ahmed; John H. Anderson; Earl R. Berry; Troy Raybold; Lalit S. Shah; Kenneth A. Yackly

2004-01-26T23:59:59.000Z

339

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objectives of Phase I were to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The work performed under Phase II will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation.

Mushtaq Ahmed; John H. Anderson; Earl R. Berry; Troy Raybold; Lalit S. Shah; Kenneth A. Yackly

2003-12-16T23:59:59.000Z

340

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstock. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing Plan (RD and T) for implementation in Phase II. The objective of Phase II is to implement the RD and T as outlined in the Phase I RD and T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and other feedstocks. The objective of Phase III is to develop an engineering design package and a financing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.

John S. Abughazaleh; Mushtaq Ahmed; Ashok Anand; John H. Anderson; Charles Benham; Fred D. Brent; Thomas E. Chance; William K. Davis; Raymond F. Drnevich; Larry Hall; Ming He; Stephen A. Lang; Jimmy O. Ong; Sarah J. Patel; George Potoczniak; Adela G. Sanchez; Charles H. Schrader; Lalit S. Shah; Phil J. Shires; Rae Song

2000-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Aquatic plant control research  

SciTech Connect (OSTI)

The Northwest region of the United States contains extensive canal systems that transport water for hydropower generation. Nuisance plants, including algae, that grow in these systems reduce their hydraulic capacity through water displacement and increased surface friction. Most control methods are applied in an ad hoc fashion. The goal of this work is to develop cost-effective, environmentally sound, long-term management strategies to prevent and control nuisance algal growth. This paper reports on a multi-year study, performed in collaboration with the Pacific Gas & Electric Company, to investigate algal growth in their canal systems, and to evaluate various control methodologies. Three types of controls, including mechanical, biological and chemical treatment, were selected for testing and evaluation. As part of this study, water quality data were collected and algal communities were sampled from numerous stations throughout the distribution system at regular intervals. This study resulted in a more comprehensive understanding of conditions leading to the development of nuisance algal growth, a better informed selection of treatment plans, and improved evaluation of the effectiveness for the control strategies selected for testing.

Pryfogle, P.A.; Rinehart, B.N. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Ghio, E.G. [Pacific Gas & Electric Company, San Francisco, CA (United States). Hydro Generation Engineering

1997-05-01T23:59:59.000Z

342

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing Plan (RD and T) for implementation in Phase II. The objective of Phase II is to implement the RD and T as outlined in the Phase I RD and T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.

John S. Abughazaleh; Mushtaq Ahmed; Ashok Anand; John H. Anderson; Charles Benham; Fred D. Brent; Thomas E. Chance; William K. Davis; Raymond F. Drnevich; Larry Hall; Ming He; Stephen A. Lang; Jimmy O. Ong; Sarah J. Patel; George Potoczniak; Adela G. Sanchez; Charles H. Schrader; Lalit S. Shah; Phil J. Shires; Rae Song

2001-02-15T23:59:59.000Z

343

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three-phase development of an Early Entrance Coproduction Plant (EECP) that produces at least one product from at least two of the following three categories: Electric power (or heat); Fuels; and Chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or some other carbonaceous feedstock, such as petroleum coke. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing (RD and T) Plan for implementation in Phase II. This objective has now been accomplished. A specific site, Motiva Refinery in Port Arthur, Texas, has been selected as the location best suited for the EECP. The accomplishments of Phase I are discussed in detail in this Phase I Concept Report. A RD and T Plan and a preliminary project financing plan have been developed and are submitted separately from this report.

John S. Abughazaleh; Mushtaq Ahmed; Ashok Anand; John H. Anderson; Charles Benham; Fred D. Brent; Thomas E. Chance; William K. Davis; Raymond F. Drnevich; Larry Hall; Ming He; Stephen A. Lang; David Mintner; Wendy Moore; Jimmy O. Ong; George Potoczniak; Adela G. Sanchez; Charles H. Schrader; Lalit S. Shah; Kalapi D. Sheth; Phil J. Shires; Rae Song

2001-05-17T23:59:59.000Z

344

Plant Energy Cost Optimization Program (PECOP)  

E-Print Network [OSTI]

The Plant Energy Cost Optimization Program (PECOP) is a Management System designed to reduce operating cost in a continuous operating multi product plant by reviewing all cost factors and selecting plant wide production schedules which are most...

Robinson, A. M.

1980-01-01T23:59:59.000Z

345

Fate of Radionuclides in Wastewater Treatment Plants  

E-Print Network [OSTI]

due to the Fukushima nuclear plant accident. Journal of21 3. NUCLEAR POWER PLANTS……………………………………………….. 23 3.1-25 3.2- WASTES FROM NUCLEAR POWER PLANTS………………………… 28 4.

Shabani Samgh Abadi, Farzaneh

2013-01-01T23:59:59.000Z

346

ASSESSING PLANTING STOCK QUALITY Comprehensive assessments of planting stock  

E-Print Network [OSTI]

for cold storage, and to evaluate effects of traditional and proposed nursery cultural practices on field and Jenkinson 1970, 1971) just after lifting and after cold storage to spring planting time · Field survival

Standiford, Richard B.

347

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

As part of the Department of Energy's (DOE) Gasification Technologies and Transportation Fuels and Chemicals programs, DOE and Texaco are partners through Cooperative Agreement DE-FC26-99FT40658 to determine the feasibility of developing, constructing and operating an Early Entrance Coproduction Plant (EECP). The overall objective of the project is the three-phase development of an EECP that produces at least one product from at least two of the following three categories: Electric power (or heat); Fuels; and Chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or some other carbonaceous feedstock, such as petroleum coke. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing (RD and T) Plan for implementation in Phase II. This objective has now been accomplished. A specific site, Motiva Refinery in Port Arthur, Texas, has been selected as the location best suited for the EECP. The specific work requirements of Phase I included: Prepare an EECP Preliminary Concept Report covering Tasks 2-8 specified in the Cooperative Agreement; Develop a Research, Development, and Testing (RD and T) Plan as specified in Task 9 of the Cooperative Agreement for implementation in Phase II; and Develop a Preliminary Project Financing Plan for the EECP Project as specified in Task 10 of the Cooperative Agreement. This document is the Preliminary Project Financing Plan for the design, construction, and operation of the EECP at the Motiva Port Arthur Refinery.

John H. Anderson; William K. Davis; Thomas W. Sloop

2001-03-21T23:59:59.000Z

348

North Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

349

New Jersey Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

350

South Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

South Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

351

New York Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

352

GEOTHERMAL POWER GENERATION PLANT | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

POWER GENERATION PLANT GEOTHERMAL POWER GENERATION PLANT Project objectives: Drilling a deep geothermal well on the Oregon Institute of Technology campus, Klamath Falls,...

353

Independent Oversight Inspection, Waste Isolation Pilot Plant...  

Energy Savers [EERE]

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August...

354

Natural Gas Processing Plant- Sulfur (New Mexico)  

Broader source: Energy.gov [DOE]

This regulation establishes sulfur emission standards for natural gas processing plants. Standards are stated for both existing and new plants. There are also rules for stack height requirements,...

355

Oversight Reports - Pantex Plant | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2012 Independent Oversight Assessment, Pantex Plant - November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant August 8, 2012 Independent Activity Report, Pantex...

356

Oversight Reports - Waste Isolation Pilot Plant | Department...  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant - December 2007 Inspection of Emergency Management at the Carlsbad Field Office and Waste Isolation Pilot Plant October 2, 2002 Independent Oversight...

357

Independent Activity Report, Hanford Plutonium Finishing Plant...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Plutonium Finishing Plant - May 2012 Independent Activity Report, Hanford Plutonium Finishing Plant - May 2012 May 2012 Criticality Safety Information Meeting for the Hanford...

358

Islamic Republic of Afghanistan  

E-Print Network [OSTI]

and Metallurgy Industries Group (AMIG) Ammunition and Metallurgy Industry Group Ammunition Industries Group

Takada, Shoji

359

Islamic Republic of Afghanistan  

E-Print Network [OSTI]

Republic of Iran Ammunition and Metallurgy Industries Group (AMIG) Ammunition and Metallurgy Industry Group

Takada, Shoji

360

Kansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear net generation (percent)","Owner" "Wolf Creek Generating Station Unit 1","1,160","9,556",100.0,"Wolf Creek Nuclear Optg Corp" "1 Plant 1 Reactor","1,160","9,556",100.0...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Vermont Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

mwh)","Share of State nuclear net generation (percent)","Owner" "Vermont Yankee Unit 1",620,"4,782",100.0,"Entergy Nuclear Vermont Yankee" "1 Plant 1 Reactor",620,"4,782",100.0...

362

Massachusetts Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

(percent)","Owner" "Pilgrim Nuclear Power Station Unit 1",685,"5,918",100.0,"Entergy Nuclear Generation Co" "1 Plant 1 Reactor",685,"5,918",100.0 "Note: Totals may not equal...

363

Plant salt-tolerance mechanisms  

DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

Crop performance is severely affected by high salt concentrations in soils. To engineer more salt-tolerant plants it is crucial to unravel the key components of the plant salt-tolerance network. Here we review our understanding of the core salt-tolerance mechanisms in plants. Recent studies have shown that stress sensing and signaling components can play important roles in regulating the plant salinity stress response. We also review key Na+ transport and detoxification pathways and the impact of epigenetic chromatin modifications on salinity tolerance. In addition, we discuss the progress that has been made towards engineering salt tolerance in crops, including marker-assisted selection and gene stacking techniques. We also identify key open questions that remain to be addressed in the future.

Deinlein, Ulrich; Stephan, Aaron B.; Horie, Tomoaki; Luo, Wei; Xu, Guohua; Schroeder, Julian I.

2014-06-01T23:59:59.000Z

364

Fiberglass plastics in power plants  

SciTech Connect (OSTI)

Fiberglass reinforced plastics (FRPs) are replacing metal in FGDs, stacks, tanks, cooling towers, piping and other plant components. The article documents the use of FRP in power plants since the 1970s. The largest volume of FRP in North American power plants is for stack liners and ductwork. Absorber vessel shells and internal components comprise the third largest use. The most common FRP absorber vessels are known as jet bubbling reactors (JBRs). One of the largest JBRs at a plant on the Ohio River removes 99% of sulphur dioxide from high sulphur coal flue gas. FRPs last twice as long as wood structures when used for cooling towers and require less maintenance. 1 tab., 2 photos.

Kelley, D. [Ashland Performance Materials (United States)

2007-08-15T23:59:59.000Z

365

Description Plants ESIS ESD FSGD  

E-Print Network [OSTI]

Ecological Site Description Plants ESIS ESD FSGD ESI Forestland ESI Rangeland Data Access > Return CHARACTERISTICS Site Type: Rangeland Site Name: Red Sandy Loam 25-32" PZ Site ID: R082AY369TX Major Land Resource

366

Issues for New Nuclear Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Explore * Idaho's energy picture * Nuclear power in the U.S. * Potential for a nuclear power plant in Idaho 0 5 10 15 20 25 1960 1970 1980 1990 2000 Million Megawatt-Hours Total...

367

Foote Hydroelectric Plant spillway rehabilitation  

SciTech Connect (OSTI)

In 1993 the spillway of the 9 MW Foote Hydroelectric Plant located on the AuSable River, near Oscoda, Michigan was rehabilitated. The Foote Plant, built in 1917, is owned and operated by Consumers Power Company. In the 76 years of continuous operation the spillway had deteriorated such that much of the concrete and associated structure needed to be replaced to assure safety of the structure. The hydro station includes an earth embankment with concrete corewall, a concrete spillway with three tainter gates and a log chute, a penstock structure and a steel and masonry powerhouse. The electric generation is by three vertical shaft units of 3,000 KW each. A plan of the plant with spillway and an elevation of the spillway section is shown. This paper describes the evaluation and repair of the plant spillway and associated structure.

Sowers, D.L. [Consumers Power Co., Jackson, MI (United States); Hasan, N.; Gertler, L.R. [Raytheon Infrastructures Services, New York, NY (United States)

1996-10-01T23:59:59.000Z

368

Next Generation Nuclear Plant Phenomena  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the U.S. Department of Energy (DOE) to develop jointly a licensing strategy for the Next Generation Nuclear plant (NGNP), a very high temperature gas-cooled reactor (VHTR) for...

369

Next Generation Nuclear Plant Phenomena  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Should that prove to be impractical (e.g. due to excessive heat loss in the intermediate heat transfer loop), an earthen berm separating the two plants may be a suitable...

370

Water Filtration Using Plant Xylem  

E-Print Network [OSTI]

Effective point-of-use devices for providing safe drinking water are urgently needed to reduce the global burden of waterborne disease. Here we show that plant xylem from the sapwood of coniferous trees – a readily available, ...

Boutilier, Michael Stephen Ha

371

Mixtec plant nomenclature and classification  

E-Print Network [OSTI]

Capsicum pubescens L. , SOLANACEAE yutu tuya’a kuán: la matade chile amarillo (PIN) tuya’a: chili plants (JAM) chá’a:nika’ndi ya’a: chilar (CAB) tuya’a (COI) Clethra mexicana

de Avila, Alejandro

2010-01-01T23:59:59.000Z

372

AQUATIC PLANT CONTROL RESEARCH PROGRAM  

E-Print Network [OSTI]

of these organisms to environmental factors (e .g. , temperature and solar radiation). Actual field data have been compared with simulation output with encouraging results. Starting biomass of the plants and numbers

US Army Corps of Engineers

373

A neighborhood alternative energy plant  

E-Print Network [OSTI]

A design that proposes the redefinition of the role of a power plant facility within a community by creating a humane environment for recreation, education, community gathering, living, and energy production; rather than ...

Brooks, Douglas James

1982-01-01T23:59:59.000Z

374

Belgrade Lot Steam Plant Lot  

E-Print Network [OSTI]

2 2A 2A Belgrade Lot Steam Plant Lot Alfond Lot Satellite Lot North Gym Lot Gym Lot Corbett Lot Greenhouse Patch Oceanographic Operations 1 2 8 5 3 4 7 6 AMC Chadbourne Merrill Aubert Hannibal Hamlin Steam

Thomas, Andrew

375

COKEMASTER: Coke plant management system  

SciTech Connect (OSTI)

To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

Johanning, J.; Reinke, M. [Krupp Koppers GmbH, Essen (Germany)

1996-12-31T23:59:59.000Z

376

Computer Control of Unattended Plants  

E-Print Network [OSTI]

COMPUTER CONTROL OF UNATTENDED PLANTS David R. Vinson, Nirma1 Chatterjee ? Ai r Products and Chemi ca 1s, Inc. Allentown, Pennsylvania Providing a cost-effective and reliable computer monitori ng, control, and optimization package is a greater... the last decade, energy costs in some air separation plants are now more than half the total product cost. Starting in 1975, Air Products and Chemicals, Inc. began implementing a program to retrofit existing major energy consuming facili ties...

Vinson, D. R.; Chatterjee, N.

1984-01-01T23:59:59.000Z

377

Researching power plant water recovery  

SciTech Connect (OSTI)

A range of projects supported by NETl under the Innovations for Existing Plant Program are investigating modifications to power plant cooling systems for reducing water loss, and recovering water from the flue gas and the cooling tower. This paper discusses two technologies showing particular promise condense water that is typically lost to evaporation, SPX technologies' Air2Air{sup trademark} condenses water from a cooling tower, while Lehigh University's process condenses water and acid in flue gas. 3 figs.

NONE

2008-04-01T23:59:59.000Z

378

SYMPOSIUM ON PLANT PROTEIN PHOSPHORYLATION  

SciTech Connect (OSTI)

Protein phosphorylation and dephosphorylation play key roles in many aspects of plant biology, including control of cell division, pathways of carbon and nitrogen metabolism, pattern formation, hormonal responses, and abiotic and biotic responses to environmental signals. A Symposium on Plant Protein Phosphorylation was hosted on the Columbia campus of the University of Missouri from May 26-28, 2010. The symposium provided an interdisciplinary venue at which scholars studying protein modification, as it relates to a broad range of biological questions and using a variety of plant species, presented their research. It also provided a forum where current international challenges in studies related to protein phosphorylation could be examined. The symposium also stimulated research collaborations through interactions and networking among those in the research community and engaged students and early career investigators in studying issues in plant biology from an interdisciplinary perspective. The proposed symposium, which drew 165 researchers from 13 countries and 21 States, facilitated a rapid dissemination of acquired knowledge and technical expertise regarding protein phosphorylation in plants to a broad range of plant biologists worldwide.

JOHN C WALKER

2011-11-01T23:59:59.000Z

379

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.

Fred D. Brent; Lalit Shah; Earl Berry; Charles H. Schrader; John Anderson; Ming He; James F. Stevens; Centha A. Davis; Michael Henley; Jerome Mayer; Harry Tsang; Jimell Erwin; Jennifer Adams; Michael Tillman; Chris Taylor; Marjan J. Roos; Robert F. Earhart

2004-01-27T23:59:59.000Z

380

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.

David Storm; Govanon Nongbri; Steve Decanio; Ming He; Lalit Shah; Charles Schrader; Earl Berry; Peter Ricci; Belma Demirel; Charles Benham; Mark Bohn

2004-01-12T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

In 1999, the U. S. Department of Energy (DOE) awarded a Cooperative Agreement to Texaco Energy Systems Inc. to provide a preliminary engineering design of an Early Entrance Coproduction Plant (EECP). Since the award, continuous and diligent work has been undertaken to achieve the design of an economical facility that makes strides toward attaining the goal of DOE's Vision 21 Program. The objective of the EECP is to convert coal and/or petroleum coke to power while coproducing transportation fuels, chemicals, and useful utilities such as steam. This objective is being pursued in a three-phase effort through the partnership of the DOE with prime contractor Texaco Energy Systems, LLC. (TES), the successor to Texaco Energy Systems, Inc. The key subcontractors to TES include General Electric (GE), Praxair, and Kellogg Brown and Root. ChevronTexaco provided gasification technology and Rentech Inc.'s Fischer-Tropsch (F-T) technology that has been developed for non-natural gas sources. GE provided gas turbine technology for the combustion of low energy content gas. Praxair provided air separation technology and KBR provided engineering to integrate the facility. A conceptual design was completed in Phase I and the report was accepted by the DOE in May 2001. The Phase I work identified risks and critical research, development, and testing that would improve the probability of technical success of the EECP. The objective of Phase II was to mitigate the risks by executing research, development, and testing. Results from the Phase II work are the subject of this report. As the work of Phase II concluded, it became evident that sufficient, but not necessarily complete, technical information and data would be available to begin Phase III - Preliminary Engineering Design. Work in Phase II requires additional technical development work to correctly apply technology at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The decision to proceed with Phase III centers on locating a new site and favorable commercial and economic factors.

John Anderson; Charles Schrader

2004-01-26T23:59:59.000Z

382

Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

NONE

1999-07-15T23:59:59.000Z

383

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). Phase II RD&T Task 2.6 identified as potential technical risks to the EECP the fuel/engine performance and emissions of the F-T diesel fuel products. Hydrotreating the neat F-T diesel product reduces potentially reactive olefins, oxygenates, and acids levels and alleviates corrosion and fuel stability concerns. Future coproduction plants can maximize valuable transportation diesel by hydrocracking the F-T Synthesis wax product to diesel and naphtha. The upgraded neat F-T diesel, hydrotreater F-T diesel, and hydrocracker F-T diesel products would be final blending components in transportation diesel fuel. Phase II RD&T Task 2.6 successfully carried out fuel lubricity property testing, fuel response to lubricity additives, and hot-start transient emission tests on a neat F-T diesel product, a hydrocracker F-T diesel product, a blend of hydrotreater and hydrocracker F-T diesel products, and a Tier II California Air Resources Board (CARB)-like diesel reference fuel. Only the neat F-T diesel passed lubricity inspection without additive while the remaining three fuel candidates passed with conventional additive treatment. Hot-start transient emission tests were conducted on the four fuels in accordance with the U.S. Environmental Protection Agency (EPA) Federal Test Procedure (FTP) specified in Code of Federal Regulations, Title 40, Part 86, and Subpart N on a rebuilt 1991 Detroit Diesel Corporation Series 60 heavy-duty diesel engine. Neat F-T diesel fuel reduced oxides of nitrogen (NO{sub x}), total particulate (PM), hydrocarbons (HC), carbon monoxide (CO), and the Soluble Organic Fraction (SOF) by 4.5%, 31%, 50%, 29%, and 35%, respectively, compared to the Tier II CARB-like diesel. The hydrocracker F-T diesel product and a blend of hydrocracker and hydrotreater F-T diesel products also reduced NO{sub x}, PM, HC, CO and SOF by 13%, 16% to 17%, 38% to 63%, 17% to 21% and 21% to 39% compared to the Tier II CARB-like diesel. The fuel/engine performance and emissions of the three F-T diesel fuels exceed the performance of a Tier II CARB-like diesel. Phase II RD&T Task 2.6 successfully met the lubricity property testing and F-T diesel fuel hot-start transient emissions test objectives. The results of the testing help mitigate potential economic risks on obtaining a premium price for the F-T diesel fuel

Fred D. Brent; Lalit Shah; Earl Berry; Charles H. Schrader; John Anderson; J. Erwin; Matthew G. Banks; Terry L. Ullman

2004-01-12T23:59:59.000Z

384

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I the team identified several potential methods to reduce or minimize the environmental impact of the proposed EECP. The EECP Project Team identified F-T catalyst disposal, beneficial gasifier slag usage (other than landfill), and carbon dioxide recovery for the gas turbine exhaust for study under this task. Successfully completing the Task 2.10 RD&T provides additional opportunities for the EECP to meet the goals of DOE's Vision 21 Program. The gasification section offers several opportunities to maximize the environmental benefits of an EECP. The spent F-T catalyst can be sent to landfills or to the gasification section. Testing in Phase II shows that the spent F-T catalyst with a small wax coating can safely meet federal landfill requirements. As an alternative to landfilling, it has been proposed to mix the spent F-T catalyst with the petroleum coke and feed this mixture to the gasification unit. Based on ChevronTexaco's experience with gasification and the characteristics of the spent F-T catalyst this appears to be an excellent opportunity to reduce one potential waste stream. The slag from the gasification unit can be commercially marketed for construction or fuel (such as cement kiln fuel) uses. The technical and economic benefits of these options must be reviewed for the final EECP before incorporating a specific alternative into the design basis. Reducing greenhouse gas emissions, particularly carbon dioxide, is an important goal of the EECP. The Texaco gasification process provides opportunities to capture high purity streams of carbon dioxide. For Phase II, a carbon fiber composite molecular sieve (CFCMS) was tested to determine its potential to remove high purity carbon dioxide from the exhaust of a gas turbine. Testing on with a simulated gas turbine exhaust shows that the CFCMS is able to remove high purity carbon dioxide from the exhaust. However, more development is required to optimize the system.

John H. Anderson; Charles Benham; Earl R. Berry; Ming He; Charles H. Schrader; Lalit S. Shah; O.O. Omatete; T.D. Burchell

2004-01-12T23:59:59.000Z

385

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC (TES), a subsidiary of ChevronTexaco, General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc. GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified catalyst/wax separation as a potential technical and economic risk. To mitigate risks to the proposed EECP, Phase II RD&T included tests of an alternative (to Rentech's Dynamic Settler) primary catalyst/wax separation device and secondary catalyst/wax separation systems. The team evaluated multiple technologies for both primary and secondary catalyst/wax separation. Based on successful testing at Rentech (outside of DOE funding) and difficulties in finalizing a contract to demonstrate alternative primary catalyst/wax separation technology (using magnetic separation technology), ChevronTexaco has selected the Rentech Dynamic Settler for primary catalyst/wax separation. Testing has shown the Dynamic Settler is capable of producing filtrate exceeding the proposed EECP primary catalyst/wax separation goal of less than 0.1 wt%. The LCI Scepter{reg_sign} Microfiltration system appeared to be best suited for producing a filtrate that met the EECP secondary catalyst/wax separation standards of 10 parts per million (weight) [ppmw]. The other technologies, magnetic separation and electrostatic separation, were promising and able to reduce the solids concentrations in the filtrate. Additional RD&T will be needed for magnetic separation and electrostatic separation technologies to obtain 10 ppmw filtrate required for the proposed EECP. The Phase II testing reduces the technical and economic risks and provides the information necessary to proceed with the development of an engineering design for the EECP Fischer-Tropsch catalyst/wax separation system.

John Anderson; Mark Anselmo; Earl Berry; Mark Bohn; Roko Bujas; Ming He; Ken Kwik; Charles H. Schrader; Lalit Shah; Dennis Slater; Donald Todd; Don Wall

2003-08-21T23:59:59.000Z

386

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to its detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC (TES) (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR). The work was under cooperative agreements with the U.S. Department of Energy (DOE). TES is providing the gasification technology and the Fischer-Tropsch (F-T) technology developed by Rentech Inc., GE is providing the combustion turbine technology, Praxair is providing the air separation technology, and KBR is providing overall engineering. Each of the EECP's subsystems was assessed for technical risks and barriers in Phase I. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified catalyst/wax separation as a potential technical and economic risk. To mitigate risks to the proposed EECP concept, Phase II RD&T included tests for secondary catalyst/wax separation systems as part of Task 2.3--Catalyst/Wax Separation. The LCI Scepter{reg_sign} Microfiltration system was determined to be best suited for producing a filtrate that met the EECP secondary catalyst/wax separation standards of producing F-T wax containing less than10 ppmw solids. As part of task 2.3, micro-filtration removal efficiencies and production rates for two FT feeds, Rentech Inc. bubble column reactor (BCR) product and LaPorte Alternative Fuels Development Unit (AFDU) product, were evaluated. Based on comparisons between the performances of these two materials, the more readily available LaPorte AFDU material was judged an acceptable analog to the BCR material that would be produced in a larger-scale F-T synthesis. The present test was initiated to obtain data in an extended range of concentration for use in the scale-up design of the secondary catalyst/wax separation system that would be operating at the EECP capacity.

John Anderson; Mark Anselmo; Earl Berry; Mark Bohn; Ming He; Charles H. Schrader; Lalit Shah; Donald Todd; Robert Schavey

2004-01-12T23:59:59.000Z

387

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using petroleum coke and ChevronTexaco's proprietary gasification technology. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC. (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). ChevronTexaco is providing gasification technology and Fischer-Tropsch technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified F-T reactor scale-up as a potential technical risk. The objective of Task 2.3 was to confirm engineering models that allow scale-up to commercial slurry phase bubble column (SPBC) reactors operating in the churn-turbulent flow regime. In developmental work outside the scope of this project, historical data, literature references, and a scale-up from a 1 1/2-in. (3.8 cm) to 6-ft (1.8 m) SPBC reactor have been reviewed. This review formed the background for developing scale-up models for a SPBC reactor operating in the churn-turbulent flow regime. The necessary fundamental physical parameters have been measured and incorporated into the mathematical catalyst/kinetic model developed from the SPBC and CSTR work outside the scope of this EECP project. The mathematical catalyst/kinetic model was used to compare to experimental data obtained at Rentech during the EECP Fischer-Tropsch Confirmation Run (Task 2.1; reported separately). The prediction of carbon monoxide (CO) conversion as a function of days on stream compares quite closely to the experimental data.

Randy Roberts

2003-04-25T23:59:59.000Z

388

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I the team identified the integration of the water produced in the F-T synthesis section with the gasification section as an area of potential synergy. By utilizing the F-T water in the petroleum coke slurry for the gasifier, the EECP can eliminate a potential waste stream and reduce capital costs. There is a low technical risk for this synergy, however, the economic risk, particularly in regards to the water, can be high. The economic costs include the costs of treating the water to meet the locally applicable environmental standards. This option may require expensive chemicals and treatment facilities. EECP Phase II included tests conducted to confirm the viability of integrating F-T water in the slurry feed for the gasifier. Testing conducted at ChevronTexaco's Montebello Technology Center (MTC) included preparing slurries made using petroleum coke with F-T water collected at the LaPorte Alternative Fuels Development Unit (AFDU). The work included bench scale tests to determine the slurry ability of the petroleum coke and F-T water. The results of the tests show that F-T water does not adversely affect slurries for the gasifier. There are a few cases where in fact the addition of F-T water caused favorable changes in viscosity of the slurries. This RD&T task was executed in Phase II and results are reported herein.

Abdalla H. Ali; Raj Kamarthi; John H. Anderson; Earl R. Berry; Charles H. Schrader; Lalit S. Shah

2003-04-16T23:59:59.000Z

389

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The 1999 U. S. Department of Energy (DOE) award to Texaco Energy Systems Inc. (presently Texaco Energy Systems LLC, a subsidiary of ChevronTexaco) was made to provide a Preliminary Engineering Design of an Early Entrance Coproduction Plant (EECP). Since the award presentation, work has been undertaken to achieve an economical concept design that makes strides toward the DOE Vision 21 goal. The objective of the EECP is to convert coal and/or petroleum coke to electric power plus transportation fuels, chemicals and useful utilities such as steam. The use of petroleum coke was added as a fuel to reduce the cost of feedstock and also to increase the probability of commercial implementation of the EECP concept. This objective has been pursued in a three phase effort through the partnership of the DOE with prime contractor Texaco Energy Systems LLC and subcontractors General Electric (GE), Praxair, and Kellogg Brown and Root (KBR). ChevronTexaco is providing gasification technology and Rentech's Fischer-Tropsch technology that has been developed for non-natural gas feed sources. GE is providing gas turbine technology for the combustion of low energy content gas. Praxair is providing air separation technology, and KBR is providing engineering to integrate the facility. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. Phase I Preliminary Concept Report was completed in 2000. The Phase I Preliminary Concept Report was prepared based on making assumptions for the basis of design for various technologies that are part of the EECP concept. The Phase I Preliminary Concept Report was approved by the DOE in May 2001. The Phase I work identified technical and economic risks and critical research, development, and testing that would improve the probability of the technical and economic success of the EECP. The Project Management Plan (Task 1) for Phase II was approved by the DOE in 2001. The results of RD&T efforts for Phase II are expected to improve the quality of assumptions made in Phase I for basis of design for the EECP concept. The RD&T work plan (Task 2 and 3) for Phase II has been completed. As the RD&T work conducted during Phase II concluded, it became evident that sufficient, but not necessarily complete, technical information and data would be available to begin Phase III - Basic Engineering Design. Also due to the merger of Chevron and Texaco, the proposed refinery site for the EECP was not available. It became apparent that some additional technical development work would be needed to correctly apply the technology at a specific site. The objective of Task 4 of Phase II is to update the concept basis of design produced during Phase I. As part of this task, items that will require design basis changes and are not site dependent have been identified. The team has qualitatively identified the efforts to incorporate the impacts of changes on EECP concept. The design basis has been modified to incorporate those changes. The design basis changes for those components of EECP that are site and feedstock dependent will be done as part of Phase III, once the site has been selected.

Charles Benham; Mark Bohn; John Anderson; Earl Berry; Fred Brent; Ming He; Randy Roberts; Lalit Shah; Marjan Roos

2003-09-15T23:59:59.000Z

390

Waste Treatment Plant - 12508  

SciTech Connect (OSTI)

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

Harp, Benton; Olds, Erik [US DOE (United States)

2012-07-01T23:59:59.000Z

391

Method of identifying plant pathogen tolerance  

DOE Patents [OSTI]

A process for identifying a plant having disease tolerance comprising administering to a plant an inhibitory amount of ethylene and screening for ethylene insensitivity, thereby identifying a disease tolerant plant, is described. Plants identified by the foregoing process are also described. 7 figs.

Ecker, J.R.; Staskawicz, B.J.; Bent, A.F.; Innes, R.W.

1997-10-07T23:59:59.000Z

392

Biochemical Conversion Pilot Plant (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet provides information about Biochemical Conversion Pilot Plant capabilities and resources at NREL.

Not Available

2012-06-01T23:59:59.000Z

393

Pilot Plant Options for the MFE Roadmap  

E-Print Network [OSTI]

Pilot Plant Options for the MFE Roadmap Hutch Neilson Princeton Plasma Physics Laboratory International Workshop MFE Roadmapping for the ITER Era Princeton, NJ 10 September 2011 #12;Outline 2 · Pilot plant ­ mission, motivation, and description. · Role of pilot plants on the Roadmap to Demo. Pilot Plant

394

PHYSICAL PLANT OPERATING POLICY AND PROCEDURE  

E-Print Network [OSTI]

in this technology. REVIEW This Physical Plant Operating Policy/Procedure (PP/OP) will be reviewed in March of each Plant. Physical Plant's intention is to provide each employee reasonable access to the technology Plant technology will be a prime consideration. Requests for non-standard products will not be approved

Gelfond, Michael

395

HYDROCARBONS FROM PLANTS: ANALYTICAL METHODS AND OBSERVATIONS  

E-Print Network [OSTI]

petrochemical industry,· The methanol residue is substantially all fermentable to ethanol. There are other plants

Calvin, Melvin

2013-01-01T23:59:59.000Z

396

The Water Circuit of the Plants - Do Plants have Hearts ?  

E-Print Network [OSTI]

There is a correspondence between the circulation of blood in all higher animals and the circulation of sap in all higher plants - up to heights h of 140 m - through the xylem and phloem vessels. Plants suck in water from the soil, osmotically through the roothair zone, and subsequently lift it osmotically again, and by capillary suction (via their buds, leaves, and fruits) into their crowns. In between happens a reverse osmosis - the endodermis jump - realized by two layers of subcellular mechanical pumps in the endodermis walls which are powered by ATP, or in addition by two analogous layers of such pumps in the exodermis. The thus established root pressure helps forcing the absorbed ground water upward, through the whole plant, and often out again, in the form of guttation, or exudation.

Wolfgang Kundt; Eva Gruber

2006-03-17T23:59:59.000Z

397

Expression of multiple proteins in transgenic plants  

DOE Patents [OSTI]

A method is disclosed for the production of multiple proteins in transgenic plants. A DNA construct for introduction into plants includes a provision to express a fusion protein of two proteins of interest joined by a linking domain including plant ubiquitin. When the fusion protein is produced in the cells of a transgenic plant transformed with the DNA construction, native enzymes present in plant cells cleave the fusion protein to release both proteins of interest into the cells of the transgenic plant. Since the proteins are produced from the same fusion protein, the initial quantities of the proteins in the cells of the plant are approximately equal.

Vierstra, Richard D. (Madison, WI); Walker, Joseph M. (Madison, WI)

2002-01-01T23:59:59.000Z

398

Plants having modified response to ethylene  

DOE Patents [OSTI]

The invention includes transformed plants having at least one cell transformed with a modified ETR nucleic acid. Such plants have a phenotype characterized by a decrease in the response of at least one transformed plant cell to ethylene as compared to a plant not containing the transformed plant cell. Tissue and/or temporal specificity for expression of the modified ETR nucleic acid is controlled by selecting appropriate expression regulation sequences to target the location and/or time of expression of the transformed nucleic acid. The plants are made by transforming at least one plant cell with an appropriate modified ETR nucleic acid, regenerating plants from one or more of the transformed plant cells and selecting at least one plant having the desired phenotype. 67 figs.

Meyerowitz, E.M.; Chang, C.; Bleecker, A.B.

1998-10-20T23:59:59.000Z

399

State power plant productivity programs  

SciTech Connect (OSTI)

The findings of a working group formed to review the status of efforts by utilities and utility regulators to increase the availability and reliability of generating units are presented. Representatives from nine state regulatory agencies, NRRI, and DOE, participated on the Working Group. The Federal government has been working cooperatively with utilities, utility organizations, and with regulators to encourage and facilitate improvements in power plant productivity. Cooperative projects undertaken with regulatory and energy commissions in California, Illinois, New York, Ohio, Texas, North Carolina and Mighigan are described. Following initiation of these cooperative projects, DOE funded a survey to determine which states were explicitly addressing power plant productivity through the regulatory process. The Working Group was formed following completion of this survey. The Working Group emphasized the need for those power plant productivity improvements which are cost effective. The cost effectiveness of proposed availability improvement projects should be determined within the context of opportunities for operating and capital improvements available to an entire utility. The Working Group also identified the need for: allowing for plant designs that have a higher construction cost, but are also more reliable; allowing for recovery and reducing recovery lags for productivity-related capital expenditures; identifying and reducing disincentives in the regulatory process; ascertaining that utilities have sufficient money available to undertake timely maintenance; and support of EPRI and NERC to develop a relevant and accurate national data base. The DOE views these as extremely important aspects of any regulatory program to improve power plant productivity.

Not Available

1981-02-01T23:59:59.000Z

400

Plant Science Graduates Spring 2011 Bachelor of Science in Plant Sciences  

E-Print Network [OSTI]

Plant Science Graduates Spring 2011 Bachelor of Science in Plant Sciences Joshua Paul Baker, Old Dale Wallace, Centerville Master of Science Reginald Jason Millwood, Plant Sciences Kara Lee Warwick, Plant Sciences Undergraduate Degrees, Summer Term 2011 Henry Joseph Cope, III, Plant Sciences David

Tennessee, University of

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Colorado Rare Plant Technical Committee presents: Colorado Rare Plant Symposium  

E-Print Network [OSTI]

The Colorado Rare Plant Technical Committee presents: 5th Annual Colorado Rare Plant Symposium September 5, 2008 Montrose, Colorado Sponsored by: Colorado Rare Plant Technical CommitteeColorado Rare Plant Technical Committee Colorado Native Plant Society University of Colorado Herbarium US Fish

402

The Colorado Rare Plant Technical Committee presents: 2nd Annual Rare Plant  

E-Print Network [OSTI]

The Colorado Rare Plant Technical Committee presents: 2nd Annual Rare Plant Symposium Friday, September 16th, 2005 8am-noon: 2nd Annual Colorado Rare Plant Symposium (Discuss G1 species) 6:30-7:30pm with the Colorado Native Plant Society's Annual Meeting Sponsored by: #12;The Second Annual Colorado Rare Plant

403

EARLY ENTRANCE COPRODUCTION PLANT  

SciTech Connect (OSTI)

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified petroleum coke characteristics as a potential technical risk. The composition of petroleum coke varies from one refinery to another. Petroleum coke characteristics are a function of the crude oil slate available at the refinery and the coker operating parameters. The specific petroleum coke characteristics at a refinery affect the design of the Gasification and Acid Gas Removal (AGR) subsystems. Knowing the petroleum coke composition provides the necessary data to proceed to the EECP Phase III engineering design of the gasification process. Based on ChevronTexaco's experience, the EECP team ranked the technical, economic, and overall risks of the petroleum coke composition related to the gasification subsystem as low. In Phase I of the EECP Project, the Motiva Port Arthur Refinery had been identified as the potential EECP site. As a result of the merger between Texaco and Chevron in October 2001, Texaco was required to sell its interest in the Motiva Enterprises LLC joint venture to Shell Oil Company and Saudi Refining Inc. To assess the possible impact of moving the proposed EECP host site to a ChevronTexaco refinery, samples of petroleum coke from two ChevronTexaco refineries were sent to MTC for bench-scale testing. The results of the analysis of these samples were compared to the Phase I EECP Gasification Design Basis developed for Motiva's Port Arthur Refinery. The analysis confirms that if the proposed EECP is moved to a new refinery site, the Phase I EECP Gasification Design Basis would have to be updated. The lower sulfur content of the two samples from the ChevronTexaco refineries indicates that if one of these sites were selected, the Sulfur Recovery Unit (SRU) might be sized smaller than the current EECP design. This would reduce the capital expense of the SRU. Additionally, both ChevronTexaco samples have a higher hydrogen to carbon monoxide ratio than the Motiva Port Arthur petroleum coke. The higher hydrogen to carbon monoxide ratio could give a slightly higher F-T products yield from the F-T Synthesis Reactor. However, the EECP Gasification Design Basis can not be updated until the site for the proposed EECP site is finalized. Until the site is finalized, the feedstock (petroleum coke) characteristics are a low risk to the EECP project.

Abdalla H. Ali; John H. Anderson; Earl R. Berry; Charles H. Schrader; Lalit S. Shah

2003-04-16T23:59:59.000Z

404

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites  

SciTech Connect (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

Stoltenberg, B.; Konz, C.; Mosey, G.

2013-05-01T23:59:59.000Z

405

Power plants development in Romania  

SciTech Connect (OSTI)

The Romanian PV research program initiated in 1980 has as its aim the development of the Romanian own PV network from solar cells production to demonstration projects and commercial applications. Concerning the PV grid connected systems the Romanian research program is financed by the Romanian Ministry for Research and Technology. Setting out the main objectives and the related stages of this project, in the paper are presented aspects concerning the plant configuration, its component characteristics and preliminary achieved results. The aspects which are going to be developed in the following stages of the grid-connected PV plant implementation in Romania are also underlined.

Tanasescu, F.T. [Ministry of Research and Technology, Bucharest (Romania); Olariu, N. [Univ. Targoviste (Romania). Energy and Environment Research Dept.

1994-12-31T23:59:59.000Z

406

Plant and Soil An International Journal on Plant-Soil  

E-Print Network [OSTI]

on growth responses, membrane transport, stomatal function, and paradigms of ion accumulation toxicity. Ion transport . Potassium Introduction Sodium is the sixth most abundant element in earth's crust+ ) is one of the most intensely researched ions in plant biology and has attained a repu- tation for its

Kronzucker, Herbert J.

407

Balance of Plant Requirements for a Nuclear Hydrogen Plant  

SciTech Connect (OSTI)

This document describes the requirements for the components and systems that support the hydrogen production portion of a 600 megawatt thermal (MWt) Next Generation Nuclear Plant (NGNP). These systems, defined as the "balance-of-plant" (BOP), are essential to operate an effective hydrogen production plant. Examples of BOP items are: heat recovery and heat rejection equipment, process material transport systems (pumps, valves, piping, etc.), control systems, safety systems, waste collection and disposal systems, maintenance and repair equipment, heating, ventilation, and air conditioning (HVAC), electrical supply and distribution, and others. The requirements in this document are applicable to the two hydrogen production processes currently under consideration in the DOE Nuclear Hydrogen Initiative. These processes are the sulfur iodide (S-I) process and the high temperature electrolysis (HTE) process. At present, the other two hydrogen production process - the hybrid sulfur-iodide electrolytic process (SE) and the calcium-bromide process (Ca-Br) -are under flow sheet development and not included in this report. While some features of the balance-of-plant requirements are common to all hydrogen production processes, some details will apply only to the specific needs of individual processes.

Bradley Ward

2006-04-01T23:59:59.000Z

408

Plant Population Viability and Restoration Potential for Rare Plants  

E-Print Network [OSTI]

solar developments in the Mojave and Sonoran deserts of California will significantly impact plants to be affected by utilityscale solar energy Mojave Desert wildflowers in California's Mojave National the biological impacts of solar projects within the Mojave and Colorado deserts of California. Population

409

Thermodynamics -2 A cogeneration plant (plant which provides both electricity and thermal energy) executes a cycle  

E-Print Network [OSTI]

Thermodynamics - 2 A cogeneration plant (plant which provides both electricity and thermal energy] Determine the rate of heat addition in the steam generator. Now consider an ideal, reversible cogeneration 1 2 3 45 6 Cogeneration Plant Boundary #12;

Virginia Tech

410

Integrated Toxic Plant Management Handbook: Livestock Poisoning Plants of the Trans-Pecos Region of Texas  

E-Print Network [OSTI]

Photographs, plant descriptions, and symptoms of poisoning help ranchers identify toxic plants that may be harmful to their livestock in West Texas. There is also information on grazing, livestock management, and toxic plant control....

Hart, Charles R.; McGinty, Allan; Carpenter, Bruce B.

2001-01-11T23:59:59.000Z

411

Methodology for Scaling Fusion Power Plant Availability  

SciTech Connect (OSTI)

Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, "Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the "teething" problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated "mature" subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

Lester M. Waganer

2011-01-04T23:59:59.000Z

412

Design and simulation of a plant control system for a GCFR demonstration plant  

SciTech Connect (OSTI)

A plant control system is being designed for a 300 MW(e) Gas Cooled Fast Breeder Reactor (GCFR) demonstration plant. Control analysis is being performed as an integral part of the plant design process to ensure that control requirements are satisfied as the plant design evolves. Plant models and simulations are being developed to generate information necessary to further define control system requirements for subsequent plant design iterations.

Estrine, E.A.; Greiner, H.G.

1980-02-01T23:59:59.000Z

413

Successful restoration of plant communities  

E-Print Network [OSTI]

of restoration failure if seed source is incorrect #12;Unexpected results... Penstemon deustus (hot rock miles NEVADA UTAH IDAHOOREGON #12;Plant-focused restoration efforts Disturbed Site Cheatgrass (49%) Rock/Bare Ground (50%) Shrub (0.8%) Native Grass (0.7%) Cattle Dung (0.2%) Undisturbed Site Cheatgrass (0.7%) Rock

Fant, Jeremie

414

Plant Level Energy Performance Benchmarking  

E-Print Network [OSTI]

(# of Employees) + C3 x Ln(Degree Days) + C 4 x (Ice Cream) + Csx (Packaged) Ln(E$/HR) = Co + C 1 x Ln(Effective Shipment Value) + C 2 x Ln(Degree Days) + C 3 x Ln(Plant Hours} + C 4 x (Ice Cream) + C s x (Packaged) Table-S. E$OR and E$/HR Regression...

Hicks, T. W.

415

Systemic Signalling in Plant Development  

E-Print Network [OSTI]

develop continuously throughout their life cycle, constantly initiating new or- gans. They doSystemic Signalling in Plant Development David Jackson, Cold Spring Harbor Laboratory, Cold Spring to the production of systemic signals that control the development of distant organs and tissues. Introduction

Jackson, David

416

Ram Village South Chiller Plant  

E-Print Network [OSTI]

Winston Ram Village South Chiller Plant Dental Craige Campus Alumni Swain Stacy Thermal Student Planetarium Ackland Art Museum Research Chiller D 114 Chase Ave. APCF- Grounds Medical Morehead Stalling- Evans Sports Medicine Center Cobb Hall Ernie School Old Hospital Chiller Hanes Art Coker Wilson Battle

North Carolina at Chapel Hill, University of

417

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

418

Selecting Landscape Plants: Shade Trees  

E-Print Network [OSTI]

Selecting Landscape Plants: Shade Trees Diane Relf, Extension Specialist, Horticulture, Virginia for any landscape plan. They set the stage for the entire home grounds design. The type used. Many will live and enhance the landscape for 100 or more years if they are given a chance. Because

Liskiewicz, Maciej

419

Magnetic Fusion Pilot Plant Studies  

E-Print Network [OSTI]

FNSF = Fusion Nuclear Science Facility CTF = Component Test Facility · Powerplantlike maintenance. · Targeted ultimate capabilities: ­ Fusion nuclear S&T development, component testing · Steady applicable to power plant · Demonstrate methods for fast replacement of in-vessel components ­ Net

420

Advanced nuclear plant control complex  

DOE Patents [OSTI]

An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Glutathione-S-conjugate transport in plants  

DOE Patents [OSTI]

The invention includes an isolated DNA encoding a plant GS-X pump polypeptide and an isolated preparation of a plant GS-X pump polypeptide. Also included is an isolated preparation of a nucleic acid which is antisense in orientation to a portion or all of a plant GS-X pump gene. The invention also includes a cells, vectors and transgenic plants having an isolated DNA encoding a plant GS-X pump and methods of use thereof. In addition, the invention relates to plant GS-X pump promoter sequences and the uses thereof.

Rea, Philip A. (Ardmore, PA); Lu, Yu-Ping (Havertown, PA); Li, Ze-Sheng (Prospect Park, PA)

2000-01-01T23:59:59.000Z

422

Plant Physiology: Manipulating Plant Growth with Solar Radiation Dennis Decoteau, Ph.D.  

E-Print Network [OSTI]

Plant Physiology: Manipulating Plant Growth with Solar Radiation Dennis Decoteau, Ph.D. Department. Greenhouse Glazing & Solar Radiation Transmission Workshop, October 1998 © CCEA, Center for Controlled

Decoteau, Dennis R.

423

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

Research Program, June 11-15, 2012 Multiple Bathymetric Datasets Limited bay bathymetry NOAA ­ Offshore north channel and north bay channel Federally maintained entrance and south channel (15 years) NAN Research Program, June 11-15, 2012 7 Prep for the Coastal Modeling System Based off of a Cartesian grid

US Army Corps of Engineers

424

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

resources challenges: · Lack of a national water resources Vision to elevate water infrastructure Securing the Nation's Future Through Water Click link to view video #12;BUILDING STRONG® National Water Demand for Water Flood Risk Water Quality Persistent Conflict Energy Environmental Values 3 #12;BUILDING

US Army Corps of Engineers

425

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

Nuclear Regulatory Commission US Environmental Protection Agency US Department of Energy Babcock Wilcox Team #12;BUILDING STRONG® Project Objectives Protect human health and the environment Complete cleanup in a safe, effective, and efficient manner Comply with the Comprehensive Environmental Response

US Army Corps of Engineers

426

Making the Connection: Beneficial Collaboration Between Army...  

Broader source: Energy.gov (indexed) [DOE]

to reduce traditional energy usage * Tasks - Examine current collaboration - Identify problems and barriers to collaboration - Identify and assess options for improving...

427

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

Interest from elected officials #12;BUILDING STRONG® New sign #12;BUILDING STRONG® New signs #12;BUILDING STRONG® Tulsa District vs. Grayson County Judge Drue Bynum disagreed with how Tulsa District meetings early Educate vs. Dictate Catching rumors early Speak with one voice #12;BUILDING STRONG

US Army Corps of Engineers

428

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

Create film loops Data calculator Dataset creation Connect with outside tools Import/export CAD data and model change. · Edit Window - Fields directly below the menu bar showing the coordinates and function values for selected entities. · Graphics Window - Display panel to show the data being manipulated

US Army Corps of Engineers

429

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

2016 ­ Public Meeting Sep 2013 ­DSMS approved for inclusion in the FY15 budget Jul 2013 ­ Engineering Update Cost Share Partner Semi-Annually Public Meeting in Valliant in Jul 2015 Public Outreach Pine 2015 ­ Independent External Peer Review Mid-point of Construction July 2015 ­ Public Meeting Oct 2014

US Army Corps of Engineers

430

US Army Corps of EngineersR  

E-Print Network [OSTI]

............................................................................................................12 Intergovernmental Panel on Climate Change....................................................................13 Adaptations to Climate Change YEAR 2008 PARTNERING Sharing Information, Collaboration & Communication PROBLEM SOLVING Planning

US Army Corps of Engineers

431

US Army Corps of EngineersR  

E-Print Network [OSTI]

Forecasting Reservoir Systems and Water Management Waterborne Commerce Statistics Foreign Trade Domestic and Participation Center (CPC) 3 International Center for Integrated Water Resources Management (ICIWaRM) 3 Risk Development Support National Studies Problem Solving Investment Decision Support Methods and Models Multi-Objective/Integrated

US Army Corps of Engineers

432

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

, CMS -Flow, CMS -EV Reservoir Model Sediment Budgets Databases GIS Tools CMS -2D Asset Management Coastal Modeling System (CMS) What is the CMS? Integrated wave, current, and morphology change model Reservoir Model Sediment Budgets Channel Infilling

US Army Corps of Engineers

433

US Army Corps of Engineers Portland District  

E-Print Network [OSTI]

) 1,200 Steelhead Kelt passage at BON Passage behavior to inform decision on BON powerhouse priority

434

Engineer Pamphlet Department of the Army  

E-Print Network [OSTI]

, locks, dams, levees, jetties, floodways, diversion channels, reservoirs, canals, and hydroelectric, navigation, irrigation, water supply, hydroelectric oower, and recreation. The primary and secondary project ············ 32 The Development of Hydroelectric Power ························ 36 Tables

US Army Corps of Engineers

435

US Army Corps of Engineers BUILDING STRONG  

E-Print Network [OSTI]

-wave interactions · Transmission, runup and overtopping · Muddy bottom · Automatic grid rotation · Non-sized sed. transport (NEW) Pensacola Pass, FL Channel Infilling ~700,000 cu m Blind Pass, FL 7 #12;Coastal

US Army Corps of Engineers

436

Sandia National Laboratories: U.S. Army  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreakingStandardsTCESJBEI ResearchersTrough SystemsInnovators ofand

437

Manhattan Project: Enter the Army, 1942  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformation In closing,-- Energy, science,LinksCP-1 GOES CRITICAL

438

U.S. Army Toxic and Hazardous  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO: FILE FROM:DEC.

439

Blog Feed: Vehicles | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chu Visits Advanced Battery Plant in Michigan, Announces New Army Partnership Thirty new manufacturing plants across the country for electric vehicle batteries and components -...

440

E-Print Network 3.0 - ammunition supply point Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a 40-mm test projectile with a set of electronics that they hardened to withstand the heavy forces Source: Sherrill, David - School of Chemistry and Biochemistry, Georgia...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

E-Print Network 3.0 - ammunition logistics program Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Centers 54 Major... Program managers 467 Program managers Aircraft carriers Combat boots Combat ships ... Source: Papautsky, Ian - Department of Electrical and Computer...

442

E-Print Network 3.0 - automated ammunition logistics Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mars and beyond... . I. Introduction ne of the major logistical challenges in human space exploration is asset management Source: de Weck, Olivier L. - Department of Aeronautics...

443

DOE - Office of Legacy Management -- Twin Cities Ammunition - MN 0-01  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site - MOTracerlab Inc -Twin Cities

444

Plant maintenance and plant life extension issue, 2008  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

Agnihotri, Newal (ed.)

2008-03-15T23:59:59.000Z

445

Paleophysiology of Permian and Triassic Seed Plants  

E-Print Network [OSTI]

This study utilized both anatomically and morphologically preserved fossil plants to investigate plant paleophysiology using known form/function relationships. The fossils examined in this project come from fossil localities ...

Schwendemann, Andrew Benjamin

2012-08-31T23:59:59.000Z

446

Grazing and Browsing: How Plants are Affected  

E-Print Network [OSTI]

Grazing and browsing can have a neutral, positive or negative effect on rangeland plants. This publication explains the effects of grazing and browsing on plants, details the indicators of overuse of the range, and lists grazing management practices...

Lyons, Robert K.; Hanselka, C. Wayne

2001-12-13T23:59:59.000Z

447

Reducing Livestock Losses To Toxic Plants  

E-Print Network [OSTI]

gait alkaliweed Jatropha Berlandier Purgative oil Vomiting, diarrhea, abdominal This plant is poisonous only to cathartic mettlespurge and phytotoxin pain sheep and goats. Jatropha dioica Leatherstem Purgative oil Severe gastroenteritis, This plant...

McGinty, Allan; Machen, Richard V.

2000-04-25T23:59:59.000Z

448

Nuclear power plants: structure and function  

SciTech Connect (OSTI)

Topics discussed include: steam electric plants; BWR type reactors; PWR type reactors; thermal efficiency of light water reactors; other types of nuclear power plants; the fission process and nuclear fuel; fission products and reactor afterheat; and reactor safety.

Hendrie, J.M.

1983-01-01T23:59:59.000Z

449

Modeling water use at thermoelectric power plants  

E-Print Network [OSTI]

The withdrawal and consumption of water at thermoelectric power plants affects regional ecology and supply security of both water and electricity. The existing field data on US power plant water use, however, is of limited ...

Rutberg, Michael J. (Michael Jacob)

2012-01-01T23:59:59.000Z

450

Steam Conservation and Boiler Plant Efficiency Advancements  

E-Print Network [OSTI]

This paper examines several cost-effective steam conservation and boiler plant efficiency advancements that were implemented during a recently completed central steam boiler plant replacement project at a very large semiconductor manufacturing...

Fiorino, D. P.

451

Power Plant Research and Siting Program (Maryland)  

Broader source: Energy.gov [DOE]

The Power Plant Research and Siting Act of 1971 established the Power Plant Research Program (PPRP) to evaluate electric generation issues in the state and recommend responsible, long-term...

452

Minnesota Power Plant Siting Act (Minnesota)  

Broader source: Energy.gov [DOE]

This Act regulates the siting of large electric power generating plants, which are defined as plants designed for or capable of operating with a capacity of 50,000 kW or more. The policy of the...

453

Florida Electrical Power Plant Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Power Plant Siting Act (PPSA) is the state’s centralized process for licensing large power plants. One license—a certification— replaces local and state permits. Local governments and state...

454

Integrated Coal Gasification Power Plant Credit (Kansas)  

Broader source: Energy.gov [DOE]

Integrated Coal Gasification Power Plant Credit states that an income taxpayer that makes a qualified investment in a new integrated coal gasification power plant or in the expansion of an existing...

455

NREL: Wind Research - Boosting Wind Plant Power Output by 4%...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Boosting Wind Plant Power Output by 4%-5% through Coordinated Turbine Controls July 30, 2014 Wind plant underperformance has plagued wind plant developers for years. To address...

456

alters plant development: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

which plant communities Minnesota, University of 8 Signal compounds involved with plant perception and response to microbes alter plant physiological activities and growth of...

457

abortion plants: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 247 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

458

aposematic spiny plants: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 239 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

459

aube plant: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 262 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

460

antifungal plant defensins: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at planting time in 2009. Aboveground biomass production, coarse and fine roots, SOC Norton, Jay B. 220 THE PLANT BIOLOGY SEMINAR Molecular Plant Biology, Department of...

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Conservation Screening Curves to Compare Efficiency Investments to Power Plants  

E-Print Network [OSTI]

Efficiency Investments to Power Plants J. Koorney, A.H.Efficiency Investments to Power Plants Jonathan Koorney,Pollution, and Avoid Power Plant Construction. Testimony

Koomey, J.G.

2008-01-01T23:59:59.000Z

462

Interdisciplinary Research and Training Program in the Plant Sciences  

SciTech Connect (OSTI)

Research on plants continued. Topics include: Molecular basis of symbiotic plant-microbe interations; enzymatic mechanisms and regulation of plant cell wall biosynthesis; molecular mechanisms that regulate the expression of genes in plants; resistance of plants to environmental stress; studies on hormone biosynthesis and action; plant cell wall proteins; interaction of nuclear and organelle genomes; sensor transduction in plants; molecular mechanisms of trafficking in the plant cell; regulation of lipid metabolism; molecular bases of plant disease resistance mechanisms; biochemical and molecular aspects of plant pathogenesis; developmental biology of nitrogen-fixing cyanobacteria; environmental control of plant development and its relation to plant hormones.

Wolk, C.P.

1992-01-01T23:59:59.000Z

463

Goodyear Tire Plant Gains Traction on Energy Savings After Completing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tire Plant saved approximately 93,000 MMBtu and 875,000 annually after increasing steam system energy efficiency in their Union City, Tennessee, plant. Goodyear Tire Plant...

464

Maintenance implementation plan for B Plant  

SciTech Connect (OSTI)

The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

Tritt, S.E.

1992-06-01T23:59:59.000Z

465

Rare Plant Conservation Planning Workshop Results  

E-Print Network [OSTI]

­ one of the most imperiled species in Colorado. The species is at risk of extinction due to its narrowRare Plant Conservation Planning Workshop Results PAGOSA SPRINGS Plant Species of Focus Pagosa............................................................................................................................. 12 Attachment 1. Additional key species and plant communities in the Pagosa Springs area 13

466

ASSESSING POWER PLANT COOLING WATER INTAKE SYSTEM  

E-Print Network [OSTI]

ASSESSING POWER PLANT COOLING WATER INTAKE SYSTEM ENTRAINMENT IMPACTS Prepared For: California be obvious that large studies like these require the coordinated work of many people. We would first like from the Duke Energy South Bay and Morro Bay power plants and the PG&E Diablo Canyon Power Plant

467

SPECIAL FEATURE FACILITATION IN PLANT COMMUNITIES  

E-Print Network [OSTI]

. Horton2 1 Ecological Farming Systems, Agroscope Reckenholz-Ta¨nikon, Research Station ART, Zurich on seedling species identity, mycorrhizal identity, plant species combinations and study system. We present plant­plant interactions and by supplying and recycling nutrients. Key-words: arbuscular mycorrhizal

Horton, Tom

468

FUSION POWER PLANTS GOALS AND TECHNOLOGICAL CHALLENGES  

E-Print Network [OSTI]

FUSION POWER PLANTS ­ GOALS AND TECHNOLOGICAL CHALLENGES Farrokh Najmabadi Dept. of Electrical for fusion power plants is given and their economic, safety, and environmental features are explored. Concep- tual design studies predict that fusion power plants will be capital intensive and will be used

Najmabadi, Farrokh

469

The Colorado Rare Plant Technical Committee presents  

E-Print Network [OSTI]

The Colorado Rare Plant Technical Committee presents: 3rd Annual Rare Plant Symposium Sponsored by: Colorado Native Plant Society University of Colorado Herbarium US Fish and Wildlife Service Colorado and Eastern Colorado (Las Animas, Weld, Kit Carson, Huerfano, Pueblo, Otero, Prowers, Fremont, and El Paso

470

Plant nuclear bodies Peter J Shaw1  

E-Print Network [OSTI]

Plant nuclear bodies Peter J Shaw1 and John WS Brown2 Knowledge of the organization bodies have been examined in plants, and recently, various other sub-nuclear domains that are involved. Until recently, the only plant nuclear bodies to be in any way characterized were the nucleolus [11

Shaw, Peter

471

Transgenic plants with altered senescence characteristics  

DOE Patents [OSTI]

The identification of senescence-specific promoters from plants is described. Using information from the first senescence-specific promoter, SAG12 from Arabidopsis, other homologous promoters from another plant have been identified. Such promoters may be used to delay senescence in commercially important plants.

Amasino, Richard M. (Madison, WI); Gan, Susheng (Lexington, KY); Noh, Yoo-Sun (Madison, WI)

2002-03-19T23:59:59.000Z

472

Steam Plant Conversion Eliminating Campus Coal Use  

E-Print Network [OSTI]

Steam Plant Conversion Eliminating Campus Coal Use at the Steam Plant #12;· Flagship campus region produce 14% of US coal (TN only 0.2%) Knoxville and the TN Valley #12;· UT is one of about 70 U.S. colleges and universities w/ steam plant that burns coal · Constructed in 1964, provides steam for

Dai, Pengcheng

473

Canaigre, The New Tanning Plant.  

E-Print Network [OSTI]

........................................ Winkler County... 40 miles west of Houston. Florida.................... 12.0 70 71 Ten months old; grown on black, heavy soil........ Seven^months old; cultivated-................................... 16.5 22.5 72 Twelve months old; cultivated... important con? sideration; the first car load of the root having been shipped in 188? from Tucson, Arizona, by Mr. E. J. Kerr, who has, since that time; be? come largely interested in the commercial development of the cultivated plant. But the Mexicans...

Harrington, H. H.; Adriance, Duncan

1896-01-01T23:59:59.000Z

474

World electric power plants database  

SciTech Connect (OSTI)

This global database provides records for 104,000 generating units in over 220 countries. These units include installed and projected facilities, central stations and distributed plants operated by utilities, independent power companies and commercial and self-generators. Each record includes information on: geographic location and operating company; technology, fuel and boiler; generator manufacturers; steam conditions; unit capacity and age; turbine/engine; architect/engineer and constructor; and pollution control equipment. The database is issued quarterly.

NONE

2006-06-15T23:59:59.000Z

475

Solar thermionic power plant (II)  

SciTech Connect (OSTI)

It has been shown that the geometric configuration of a central receiver solar electric power plant (SEPP) can be optimized for the high power density and concentration required for the operation of a thermionic converter. The working period of a Thermionic Diode Converter constructed on the top of a SEPP in Riyadh area is found to be 5 to 6 hours per day in winter and 6 to 8 hours in summer. 17 refs.

Abou-Elfotouh, F.; Almassary, M.; Fatmi, H.

1981-01-01T23:59:59.000Z

476

B PLANT DOCUMENTED SAFETY ANALYSIS  

SciTech Connect (OSTI)

This document provides the documented safety analysis (DSA) and Central Plateau Remediation Project (CP) requirements that apply to surveillance and maintenance (S&M) activities at the 221-B Canyon Building and ancillary support structures (B Plant). The document replaces BHI-010582, Documented Safety Analysis for the B-Plant Facility. The B Plant is non-operational, deactivated and undergoing long term S&M prior to decontamination and decommissioning (D&D). This DSA is compliant with 10 CFR 830, Nuclear Safety Management, Subpart B, ''Safety Basis Requirements.'' The DSA was developed in accordance with U.S. Department of Energy (DOE) standard DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility Disposition Activities (DOE 1998) per Table 2 of 10 CFR 830 Appendix A, DOE Richland Operation Office (RL) direction (02-ABD-0053, Fluor Hanford Nuclear Safety Basis Strategy and Criteria) for facilities in long term S&M, and RL Direction (02-ABD-0091, ''FHI Nuclear Safety Expectations for Nuclear Facilities in Surveillance and Maintenance''). A crosswalk was prepared to identify potential inconsistencies between the previous B Plant safety analysis and DOE-STD-1120-98 guidance. In general, the safety analysis met the criteria of DOE-STD-1120-98. Some format and content changes have been made, including incorporating recent facility modifications and updating the evaluation guidelines and control selection criteria in accordance with RL direction (02-ABD-0053). The facility fire hazard analysis (FHA) and Technical Safety Requirements (TSR) are appended to this DSA as an aid to the users, to minimize editorial redundancy, and to provide an efficient basis for update.

DODD, E.N.; KERR, N.R.

2003-08-01T23:59:59.000Z

477

Morris Plant Energy Efficiency Program  

E-Print Network [OSTI]

. These valves affected the steam balance by leaking steam to lower pressure systems or to the atmosphere. Repairs to these valves enabled improved control of the medium pressure steam systems facility-wide. Since the Morris plant is energy integrated across..., the steam demand of each turbine has decreased, while minimizing deposit formation in the turbines. A facility-wide steam trap testing program was established in 2001. Numerous steam traps were found to be leaking or plugged. Replacement of these traps...

Betczynski, M. T.

2004-01-01T23:59:59.000Z

478

Nuclear plant irradiated steel handbook  

SciTech Connect (OSTI)

This reference handbook presents selected information extracted from the EPRI reactor surveillance program database, which contains the results from surveillance program reports on 57 plants and 116 capsules. Tabulated data includes radiation induced temperature shifts, capsule irradiation conditions and statistical features of the Charpy V-notch curves. General information on the surveillance materials is provided and the Charpy V-notch energy results are presented graphically.

Oldfield, W.; Oldfield, F.M.; Lombrozo, P.M.; McConnell, P.

1986-09-01T23:59:59.000Z

479

Ownership Change, Incentives and Plant Efficiency: The Divestiture of U.S. Electric Generation Plants  

E-Print Network [OSTI]

Ownership Change, Incentives and Plant Efficiency: The Divestiture of U.S. Electric Generation generating plants. Between 1998 and 2001, over 300 electric generating plants in the US, accounting Plants James B. Bushnell and Catherine Wolfram March 2005 Abstract Electric industry restructuring

Sadoulet, Elisabeth

480

Engineered plant biomass feedstock particles  

DOE Patents [OSTI]

A new class of plant biomass feedstock particles characterized by consistent piece size and shape uniformity, high skeletal surface area, and good flow properties. The particles of plant biomass material having fibers aligned in a grain are characterized by a length dimension (L) aligned substantially parallel to the grain and defining a substantially uniform distance along the grain, a width dimension (W) normal to L and aligned cross grain, and a height dimension (H) normal to W and L. In particular, the L.times.H dimensions define a pair of substantially parallel side surfaces characterized by substantially intact longitudinally arrayed fibers, the W.times.H dimensions define a pair of substantially parallel end surfaces characterized by crosscut fibers and end checking between fibers, and the L.times.W dimensions define a pair of substantially parallel top and bottom surfaces. The L.times.W surfaces of particles with L/H dimension ratios of 4:1 or less are further elaborated by surface checking between longitudinally arrayed fibers. The length dimension L is preferably aligned within 30.degree. parallel to the grain, and more preferably within 10.degree. parallel to the grain. The plant biomass material is preferably selected from among wood, agricultural crop residues, plantation grasses, hemp, bagasse, and bamboo.

Dooley, James H. (Federal Way, WA); Lanning, David N. (Federal Way, WA); Broderick, Thomas F. (Lake Forest Park, WA)

2012-04-17T23:59:59.000Z

Note: This page contains sample records for the topic "army ammunition plant" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Evaluation of fossil plants versus hydro plants for load frequency control  

SciTech Connect (OSTI)

The economics of using hydroplants with Francis turbines or fossil plants for load frequency control are evaluated. Using data from the TVA Gallatin steam plant and the TVA Cherokee, Wilson, and Fontana hydroplants, a cost comparison of different modes of operation for load frequency control was performed considering two plants at a time. The results showed that when the fossil plant was used for load frequency control instead of a hydro plant a lower system generation cost was incurred. Dynamic responses of fossil and hydro units, improved controls for fossil plants, and maneuvering costs of the Gallatin plant are also considered.

Broadwater, R.P.; Johnson, R.L.; Duckett, F.E.; Boston, W.T.

1985-01-01T23:59:59.000Z

482

Methods of saccharification of polysaccharides in plants  

DOE Patents [OSTI]

Saccharification of polysaccharides of plants is provided, where release of fermentable sugars from cellulose is obtained by adding plant tissue composition. Production of glucose is obtained without the need to add additional .beta.-glucosidase. Adding plant tissue composition to a process using a cellulose degrading composition to degrade cellulose results in an increase in the production of fermentable sugars compared to a process in which plant tissue composition is not added. Using plant tissue composition in a process using a cellulose degrading enzyme composition to degrade cellulose results in decrease in the amount of cellulose degrading enzyme composition or exogenously applied cellulase required to produce fermentable sugars.

Howard, John; Fake, Gina

2014-04-29T23:59:59.000Z

483

MSU-DOE Plant Research Laboratory  

SciTech Connect (OSTI)

This document is the compiled progress reports of research funded through the Michigan State University/Department of Energy Plant Research Laboratory. Fourteen reports are included, covering the molecular basis of plant/microbe symbiosis, cell wall biosynthesis and proteins, gene expression, stress responses, plant hormone biosynthesis, interactions between the nuclear and organelle genomes, sensory transduction and tropisms, intracellular sorting and trafficking, regulation of lipid metabolism, molecular basis of disease resistance and plant pathogenesis, developmental biology of Cyanobacteria, and hormonal involvement in environmental control of plant growth. 320 refs., 26 figs., 3 tabs. (MHB)

Not Available

1991-01-01T23:59:59.000Z

484

Kansas City Plant Celebrates Safety Milestone  

ScienceCinema (OSTI)

A gang of motorcycle riders arrived at the NNSA's Kansas City Plant on July 1 to help celebrate a significant safety achievement - working nearly five million hours, covering a one-year period without a lost-time injury. The bikers -- some of whom are plant employees -- represent Bikers Against Child Abuse, the local nonprofit selected to receive a $5,000 donation as part of the plant's safety achievement celebration. The organization was selected because it aligns with the plant's community outreach focus on Family Safety & Security and partnership with the plant's union members.

None

2010-09-01T23:59:59.000Z

485

Proceedings of a Topical Meeting On Small Scale Geothermal Power Plants and Geothermal Power Plant Projects  

SciTech Connect (OSTI)

These proceedings describe the workshop of the Topical Meeting on Small Scale Geothermal Power Plants and Geothermal Power Plant Projects. The projects covered include binary power plants, rotary separator, screw expander power plants, modular wellhead power plants, inflow turbines, and the EPRI hybrid power system. Active projects versus geothermal power projects were described. In addition, a simple approach to estimating effects of fluid deliverability on geothermal power cost is described starting on page 119. (DJE-2005)

None

1986-02-12T23:59:59.000Z

486

Genomic Aspects of Research Involving Polyploid Plants  

SciTech Connect (OSTI)

Almost all extant plant species have spontaneously doubled their genomes at least once in their evolutionary histories, resulting in polyploidy which provided a rich genomic resource for evolutionary processes. Moreover, superior polyploid clones have been created during the process of crop domestication. Polyploid plants generated by evolutionary processes and/or crop domestication have been the intentional or serendipitous focus of research dealing with the dynamics and consequences of genome evolution. One of the new trends in genomics research is to create synthetic polyploid plants which provide materials for studying the initial genomic changes/responses immediately after polyploid formation. Polyploid plants are also used in functional genomics research to study gene expression in a complex genomic background. In this review, we summarize the recent progress in genomics research involving ancient, young, and synthetic polyploid plants, with a focus on genome size evolution, genomics diversity, genomic rearrangement, genetic and epigenetic changes in duplicated genes, gene discovery, and comparative genomics. Implications on plant sciences including evolution, functional genomics, and plant breeding are presented. It is anticipated that polyploids will be a regular subject of genomics research in the foreseeable future as the rapid advances in DNA sequencing technology create unprecedented opportunities for discovering and monitoring genomic and transcriptomic changes in polyploid plants. The fast accumulation of knowledge on polyploid formation, maintenance, and divergence at whole-genome and subgenome levels will not only help plant biologists understand how plants have evolved and diversified, but also assist plant breeders in designing new strategies for crop improvement.

Yang, Xiaohan [ORNL; Ye, Chuyu [ORNL; Tschaplinski, Timothy J [ORNL; Wullschleger, Stan D [ORNL; Tuskan, Gerald A [ORNL

2011-01-01T23:59:59.000Z

487

Small Power Plant Exemption (06-SPPE-1) Imperial County  

E-Print Network [OSTI]

Small Power Plant Exemption (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT COMMISSIONDECISION ENERGY COMMISSION Small Power Plant Exemption (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT GAS TURBINE PLANT SMALL POWER PLANT EXEMPTION DOCKET NO. 06-SPPE-1 The California Energy Commission

488

PEATGAS pilot plant operating results  

SciTech Connect (OSTI)

The Institute of Gas Technology has been developing the PEATGAS process for the conversion of peat to synthetic fuels. A program has recently been completed for the pilot-plant-scale testing of the process. In this scheme, peat is gasified in a two-stage reactor system, which operates at temperatures up to 1750/sup 0/F and pressures up to 500 psig. The process can be controlled to maximize the production of either substitute natural gas (SNG) or liquid hydrocarbons. The technical feasibility of the process was demonstrated in a series of five gasification tests. Highlights of this operating program are presented in this paper.

Biljetina, R.; Punwani, D.

1982-08-01T23:59:59.000Z

489

PEATGAS pilot plant operating results  

SciTech Connect (OSTI)

The Institute of Gas Technology has been developing the PEATGAS process for the conversion of peat to synthetic fuels. A program has recently been completed for the pilot-plant-scale testing of the process. In this scheme, peat is gasified in a two-stage reactor system, which operates at temperatures up to 1750/sup 0/F and pressures up to 500 psig. The process can be controlled to maximize the production of either substitute natural gas (SNG) or liquid hydrocarbons. The technical feasibility of the process was demonstrated in a series of five gasification tests. Highlights of this operating program are presented in this paper.

Biljetina, R.; Punwani, D.

1982-01-01T23:59:59.000Z

490

Geismar TDI Plant Steam Optimization  

E-Print Network [OSTI]

BASF North America 7 ESL-IE-13-05-19 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA. May 21-24, 2013 BASF?s strategic principles A conscientious commitment to our investors, customers, employees...Geismar TDI Plant Steam Optimization May 23rd, 2013 IET Conference Meredith Bailey, PDP Engineer BASF Corporation (734) 324-5047 meredith.bailey@basf.com ESL-IE-13-05-19 Proceedings of the Thrity-Fifth Industrial Energy Technology...

Baily, M.

2013-01-01T23:59:59.000Z

491

The Propagation of Ornamental Plants.  

E-Print Network [OSTI]

of the 8-inch pot and pack the rooting medium in between the two pots. Note: If vermiculite is used, fill this space, but do not pack it. Water the medium in well with water containing a few drops of a wetting agent. Then stick cuttings in concentric... ready for planting in permanent location. Materials required for self-watering propagator. Make the cutting. Preparation of self-watering propagator. Insert cutting into rooting medium. :?-de+d self-watering -.:sqgotor filled with cuttings...

DeWerth, A. F.

1970-01-01T23:59:59.000Z

492

Pantex Plant | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSalesOE0000652 Srivastava,Pacific1of PageHYDROGENPantex Plant

493

Getting Inside Plants | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet Assistance Get AssistanceGetting Inside Plants

494

Sabotage at Nuclear Power Plants  

SciTech Connect (OSTI)

Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

Purvis, James W.

1999-07-21T23:59:59.000Z

495

Dose reduction at nuclear power plants  

SciTech Connect (OSTI)

The collective dose equivalent at nuclear power plants increased from 1250 rem in 1969 to nearly 54,000 rem in 1980. This rise is attributable primarily to an increase in nuclear generated power from 1289 MW-y to 29,155 MW-y; and secondly, to increased average plant age. However, considerable variation in exposure occurs from plant to plant depending on plant type, refueling, maintenance, etc. In order to understand the factors influencing these differences, an investigation was initiated to study dose-reduction techniques and effectiveness of as low as reasonably achievable (ALARA) planning at light water plants. Objectives are to: identify high-dose maintenance tasks and related dose-reduction techniques; investigate utilization of high-reliability, low-maintenance equipment; recommend improved radioactive waste handling equipment and procedures; examine incentives for dose reduction; and compile an ALARA handbook.

Baum, J.W.; Dionne, B.J.

1983-01-01T23:59:59.000Z

496

Plant nitrogen regulatory P-PII genes  

DOE Patents [OSTI]

The present invention generally relates to plant nitrogen regulatory PII gene (hereinafter P-PII gene), a gene involved in regulating plant nitrogen metabolism. The invention provides P-PII nucleotide sequences, expression constructs comprising said nucleotide sequences, and host cells and plants having said constructs and, optionally expressing the P-PII gene from said constructs. The invention also provides substantially pure P-PII proteins. The P-PII nucleotide sequences and constructs of the

Coruzzi, Gloria M. (New York, NY); Lam, Hon-Ming (Hong Kong, HK); Hsieh, Ming-Hsiun (Woodside, NY)

2001-01-01T23:59:59.000Z

497

On Line Power Plant Performance Monitoring  

E-Print Network [OSTI]

in achieving the best operation of the plant 3. To evaluate component performance and deterioration for use in a maintenance program 4. To develop cost data and incremental cost characteristics for the economic operation or dispatch of the unit... ? Analyze current plant?eQuipment status and diagnostics for preventive maintenance and equipment damage ? Provide current energy management and system dispatch operation information ? Capability for plant and equipment acceptance and periodic...

Ahner, D. J.; Priestley, R. R.

498

Bryan Rubber Plant - International Shoe Company, Inc.  

E-Print Network [OSTI]

BRYAN RUBBER PLANT - INTERNATIONAL SHOE COhIPANY, INC. \\\\'illis hl. Ponder, P. E. President ACR Energy Engineering, Inc. Austin, Texas ABSTRACT This paper is an energy case study of a failing American manufacturing process suffering from... plant was envisioned alongside the main production building between the original production building and the administration building. The physical plant consists of: MANUFACTURING BUILDING . single story . concrcte floor on one level . walls...

Ponder, W. M.

1985-01-01T23:59:59.000Z

499

Molybdenum nutrition of the cotton plant  

E-Print Network [OSTI]

that plants receiving molybdenum exhibited a greater capacity to c?nvert accumulated inorganic phosphorus into ?rgani? phosphorus than those lacking the element. Spencer (?0) pointed out that malybdate is a powerful competitive inhibitor of the acid..., Molybdenum cycle in the soil..................... Representative 30-day-?ld c?tt?n plants ?f the plus and minus molybdenum series* Plants in the right hand beaker are in minus molybdenum s?luti?n. . . . Figure 3* Alcohol s?luble amino acids in leaves...

Amin, Jagdish V.

1957-01-01T23:59:59.000Z

500

Wisconsin Nuclear Profile - Point Beach Nuclear Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Point Beach Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...