  1. DOE - Office of Legacy Management -- Iowa Army Ammunition Plant - IA 02

    Office of Legacy Management (LM)

    Army Ammunition Plant - IA 02 FUSRAP Considered Sites Iowa Army Ammunition Plant, IA Alternate Name(s): Burlington Ordnance Plant Iowa Ordnance Plant Silas Mason Company IA.02-3 Location: Located in Township 70 North, Range 3 West, Section 32, 5th Principal Meridian, Des Moines County, Burlington, Iowa IA.02-1 IA.02-5 Historical Operations: Assembled nuclear weapons, primarily high explosive components and conducted explosives testing using the high explosive components and depleted uranium. AEC

  2. Environmental readiness pilot study at the Badger Army Ammunition Plant, Baraboo, Wisconsin

    SciTech Connect (OSTI)

    Mays, D.; Bhinge, D.; Patel, J.; Jones-Bateman, L.; Resnick, E.

    1994-12-31

    The Badger Army Ammunition Plant (BAAP) has been on standby status since the mid-1970s, prior to the enactment of the majority of Federal environmental regulations. As a result, BAAP is unprepared to begin production without the implementation of pollution prevention and treatment measures. The Army contracted SAIC to conduct a pilot study to develop an environmental readiness plan for BAAP in the event that the plant is reactivated to produce explosives and propellants for ammunition requirements during mobilization. This paper describes the process developed by SAIC to conduct this pilot study at BAAP and the relationship between this effort and the Army`s overall environmental mission.

  3. Basewide energy systems plan, Hawthorne Army Ammunition Plant, Hawthorne, Nevada; executive summary. Final report

    SciTech Connect (OSTI)

    NONE

    1983-03-25

    This document is the Executive Summary of the Basewide Energy Systems Plan for the Hawthorne Army Ammunition Plant (HWAAP) at Hawthorne, Nevada. This project has been executed as a part of the Department of the Army`s Energy Engineering Analysis Program (EEAP). The overall objective of the project is to develop a systematic plan of projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan (AFEP), without decreasing the readiness posture of the Army. The Hawthorne Army Ammunition Plant is a Government Owned and Contractor Operator (GOCO) Army facility. Consequently, any reference made in this document to the Energy Conservation Investment Program (ECIP) is directly analagous to Energy Conservation and Management (ECAM). The ECAM designation pertains specifically to GOCO Army installations. All Programming Documents for projects developed from this study reference ECAM wherever ECIP is called for.

  4. Results of the Radiological Survey of the Iowa Army Ammunition Plant, Middletown, Iowa

    SciTech Connect (OSTI)

    Murray, M.E.

    2001-07-17

    At the request of the U.S. Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted an indoor radiological survey of property at the Iowa Army Ammunition Plant (IAAAP), Middletown, Iowa in June 2000. The purpose of the survey was to determine if radioactive residuals resulting from previous Atomic Energy Commission (AEC) activities were present inside selected Line 1 buildings at the IAAAP and conduct sampling in those areas of previous AEC operations that utilized radioactive components at some point during the manufacturing process, in order to evaluate any possible immediate health hazards and to collect sufficient information to determine the next type of survey. The AEC occupied portions of IAAAP from 1947 to 1975 to assemble nuclear weapons. The surveyed areas were identified through interviews with current and former IAAAP employees who had worked at the plant during AEC's tenure, and from AEC records.

  5. Uptake of explosives from contaminated soil by existing vegetation at the Iowa Army Ammunition Plant

    SciTech Connect (OSTI)

    Schneider, J.F.; Zellmer, S.D.; Tomczyk, N.A.; Rastorier, J.R.; Chen, D.; Banwart, W.L.

    1995-02-01

    This study examines the uptake of explosives by existing vegetation growing in soils contaminated with 2,4,6-trinitrotoluene (TNT) and 1,3,5-trinitro-3,5-triazine (RDX) in three areas at the Iowa Army Ammunition Plant (IAAP). To determine explosives uptake under natural environmental conditions, existing plant materials and soil from the root zone were sampled at different locations in each area, and plant materials were separated by species. Standard methods were used to determine the concentrations of explosives, their derivatives, and metabolites in the soil samples. Plant materials were also analyzed. The compound TNT was not detected in the aboveground portion of plants, and vegetation growing on TNT-contaminated soils is not considered a health hazard. However, soil and plant roots may contain TNT degradation products that may be toxic; hence, their consumption is not advised. The compound RDX was found in the tops and roots of plants growing on RDX-contaminated soils at all surveyed sites. Although RDX is not a listed carcinogen, several of its potentially present degradation products are carcinogens. Therefore, the consumption of any plant tissues growing on RDX-contaminated sites should be considered a potential health hazard.

  6. Energy engineering analysis Iowa Army Ammunition Plant Burlington, Iowa. Final report

    SciTech Connect (OSTI)

    NONE

    1983-05-10

    This Energy Engineering Analysis consists of the main report, three appendices, and a summary of annual energy consumption on a `per building` basis. The main report identifies the purpose of the study, describes the existing and anticipated energy use trends, and defines and summarizes specific energy conservation projects recommended to achieve the goals stated in the Army Facilities Energy Plan. Appendices I, II and III, and the Annual Energy Consumption Summary include building information, weather data, cost data, and detailed computer-generated and manual calculations for each individual project. The analysis will enable ammunition plant personnel to identify energy conservation measures and meet Army energy reduction goals. The report includes: Energy consumption by fuel type Energy consumption trends ECAM projects other potential projects Quick-fix management form Description of analyzed buildings. In addition-, the Analysis is a detailed data base consisting of: An analysis of building energy use Energy Conservation Measures applied to each analyzed building to be improved A set of marked-up prints from the survey indicating the conditions when surveyed.

  7. Energy engineering analysis, Iowa Army Ammunition Plant, Burlington, Iowa. Summary report

    SciTech Connect (OSTI)

    Jonik, D.M.

    1982-06-22

    This Energy Engineering Analysis consists of the main report, three appendices, and a summary of annual energy consumption on a per-building basis. The main report identifies the purpose of the study, describes the existing and anticipated energy use trends, and defines and summarizes specific energy conservation projects recommended to achieve the goals stated in the Army Facilities Energy Plan. Appendices I, II and III, and the Annual Energy Consumption Summary include building information, weather data, cost data, and detailed computer-generated and manual calculations for each individual project. The analysis will enable ammunition plant personnel to identify energy conservation measures and meet Army energy reduction goals. The report includes: Energy consumption by fuel type Energy consumption trends ECAM projects Other potential projects Quick-fix management form Description of analyzed buildings In addition, the Analysis is a detailed data base consisting of: An analysis of building energy use Energy Conservation Measures applied to each analyzed building to be improved A set of marked-up prints from the survey indicating the conditions when surveyed.

  8. Superfund Record of Decision (EPA Region 7): Lake City Army Ammunition Plant (NW Lagoon), Independence, MO, September 29, 1998

    SciTech Connect (OSTI)

    Not Available

    1999-03-01

    This decision document describes the selected Interim Remedial Action (IRA) for the Northeast Corner Operable Unit (NECOU), Lake City Army Ammunition Plant (LCAAP). The major components of the selected IRA for the NECOU include: Installation of a subsurface permeable reactive wall (PRW) to treat contaminated ground water in place (in-situ); A monitoring program to evaluate the effectiveness of The PRW in treating the contaminated ground water and to determine the replacement period of the reactive media; and Installation of a soil cover over the Area 17 Oil and Solvent Pits (a principal threat waste) located adjacent to the current sanitary landfill in the NECOU to minimize infiltration of water through the pits and subsequently into ground water.

  9. Installation restoration program: Hydrologic measurements with an estimated hydrologic budget for the Joliet Army Ammunition Plant, Joliet, Illinois. [Contains maps of monitoring well locations, topography and hydrologic basins

    SciTech Connect (OSTI)

    Diodato, D.M.; Cho, H.E.; Sundell, R.C.

    1991-07-01

    Hydrologic data were gathered from the 36.8-mi{sup 2} Joliet Army Ammunition Plant (JAAP) located in Joliet, Illinois. Surface water levels were measured continuously, and groundwater levels were measured monthly. The resulting information was entered into a database that could be used as part of numerical flow model validation for the site. Deep sandstone aquifers supply much of the water in the JAAP region. These aquifers are successively overlain by confining shales and a dolomite aquifer of Silurian age. This last unit is unconformably overlain by Pleistocene glacial tills and outwash sand and gravel. Groundwater levels in the shallow glacial system fluctuate widely, with one well completed in an upland fluctuating more than 17 ft during the study period. The response to groundwater recharge in the underlying Silurian dolomite is slower. In the upland recharge areas, increased groundwater levels were observed; in the lowland discharge areas, groundwater levels decreased during the study period. The decreases are postulated to be a lag effect related to a 1988 drought. These observations show that fluid at the JAAP is not steady-state, either on a monthly or an annual basis. Hydrologic budgets were estimated for the two principal surface water basins at the JAAP site. These basins account for 70% of the facility's total land area. Meteorological data collected at a nearby dam show that total measured precipitation was 31.45 in. and total calculated evapotranspiration was 23.09 in. for the study period. The change in surface water storage was assumed to be zero for the annual budget for each basin. The change in groundwater storage was calculated to be 0.12 in. for the Grant Creek basin and 0. 26 in. for the Prairie Creek basin. Runoff was 7.02 in. and 7.51 in. for the Grant Creek and Prairie Creek basins, respectively. The underflow to the deep hydrogeologic system in the Grant Creek basin was calculated to be negligible. 12 refs., 17 figs., 15 tabs.

  10. Excess Titanium from NNSA's Y-12 Plant to be Used by the Army...

    National Nuclear Security Administration (NNSA)

    Excess Titanium from NNSA's Y-12 Plant to be Used by the Army for New Generation of Protective Body Armor for Combat Troops | National Nuclear Security Administration Facebook...

  11. Secretary Chu Visits Advanced Battery Plant in Michigan, Announces New Army

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership | Department of Energy Advanced Battery Plant in Michigan, Announces New Army Partnership Secretary Chu Visits Advanced Battery Plant in Michigan, Announces New Army Partnership July 18, 2011 - 1:09pm Addthis Secretary Chu speaks at the A123 Systems lithium-ion battery manufacturing plant in Romulus, Michigan, while employees look on. | Photo Courtesy of Damien LaVera, Energy Department Secretary Chu speaks at the A123 Systems lithium-ion battery manufacturing plant in Romulus,

  12. Densified biomass as an alternative Army heating and power plant fuel. Final report

    SciTech Connect (OSTI)

    Hathaway, S.A.; Magrino, T.; Lin, J.S.; Duster, K.; Mahon, D.

    1980-03-01

    This investigation evaluated the technical and economic potential of using densified biomass (principally wood pellets) as a coal substitute in Army heating and power plants. The report reviews Department of Defense (DOD) experience with and tests of wood pellets; production of wood pellets (excluding silvicultural aspects); handling, storing, and feeding; combustion; major environental considerations; and economics of use.

  13. Smart crane ammunition transfer system

    SciTech Connect (OSTI)

    Bradley, E.C.; Killough, S.M.; Rowe, J.C.

    1995-03-01

    The purpose of the Smart Crane Ammunition Transfer System (SCATS) project is to demonstrate robotic/telerobotic controls technology for a mobile articulated crane for missile/ munitions handling, delivery, and reload. Missile resupply and reload have been manually intensive operations up to this time. Currently, reload missiles are delivered by truck to the site of the launcher. A crew of four to five personnel reloads the missiles from the truck to the launcher using a hydraulic-powered crane. The missiles are handled carefully for the safety of the missiles and personnel. Numerous steps are required in the reload process and the entire reload operation can take over 1 h for some missile systems. Recent U.S. Army directives require the entire operation to be accomplished in a fraction of that time. Current requirements for the development of SCATS are being based primarily on reloading Patriot missiles. The planned development approach will integrate robotic control and sensor technology with a commercially available hydraulic articulated crane. SCATS is being developed with commercially available hardware as much as possible. Development plans include adding a 3-D.F. end effector with a grapple to the articulating crane; closed-loop position control for the crane and end effector; digital microprocessor control of crane functions; simplified operator interface; and operating modes which include rectilinear movement, obstacle avoidance, and partial automated operation. The planned development will include progressive technology demonstrations. Ultimate plans are for this technology to be transferred and utilized in the military fielding process.

  14. Army energy conservation programs

    SciTech Connect (OSTI)

    Hutchinson, R.L.

    1983-06-01

    The Energy Engineering Analysis Program (EEAP) has been instrumented to reduce Army energy consumption by 20 percent by FY 1985. EEAP surveys and identifies high energy users, analyzes and applies conservation technologies, and submits a study report to the Director of Engineering and Housing. The Energy Conservation Investment Program (ECIP), which retrofits existing facilities with insulation, and monitoring systems, is the foundation of EEAP. The Energy Conservation and Management Plan (ECAM) is designed to do for GOCO's (government owned, contractor operated plants) what ECIP does for army plants. A few specific conversion projects are listed. An energy awareness program includes seminars, workshops, displays, and brochures. The Facilities Energy RDTandS program insures that the Army will be able to rapidly utilize the latest state-of-the-art energy technology.

  15. Tombs, tunnels, and terraces a cultural resources survey of a former ammunition supply point in Okinawa, Japan

    SciTech Connect (OSTI)

    Verhaaren, B. T.; Levenson, J. B.; Komine, G.

    2000-02-09

    U.S. forces serving at military bases on foreign soil are obligated to act as good stewards of the cultural and natural resources under their control. However, cultural resources management presents special challenges at U.S. bases in other countries where cultural properties laws differ in emphasis and detail from those in the United States and issues of land ownership and occupancy are not always clear. Where status of forces agreements (SOFAs) exist, environmental governing standards bridge the gap between U.S. and host nation cultural priorities. In Japan, the Department of Defense Japan Environmental Governing Standards (JEGS) fill this function. Under Criteria 12-4.2 and 12-4.3 of the JEGS, U.S. Forces Japan commit themselves to inventory and protect cultural properties found on the lands they control or use. Cultural properties include archaeological sites, tombs, historic buildings, and shrines. Natural monuments, such as landscape features or plant and animal species, may also be designated as cultural properties. As part of this commitment, in February 1999 a cultural resources inventory was conducted in Area 1, part of Kadena Air Base (AB), Okinawa, Japan. Area 1, the former U.S. army Ammunition Supply Point 1, is currently used primarily for training exercises and recreational paint ball.

  16. Demonstration of the smart crane ammunition transfer system

    SciTech Connect (OSTI)

    Bradley, E.C.; Killough, S.M.; Rowe, J.C.

    1996-05-01

    The purpose of the Smart Crane Ammunition Transfer System (SCATS) project is to demonstrate robotic/telerobotic controls technology for a mobile articulated crane for missile/munitions handling, delivery, and reload. Missile resupply and reload have been manually intensive operations up to this time. Currently, reload missiles are delivered by truck to the site of the launcher. A crew of four to five personnel reloads the missiles from the truck to the launcher using a hydraulic-powered crane. The missiles are handled carefully for the safety of the missiles and personnel. Numerous steps are required in the reload process and the entire reload operation can take over an hour for some missile systems. Recent US Army directives require the entire operation to be accomplished in a fraction of that time. Current development of SCATS is being based primarily on reloading Patriot missiles. This paper summarizes the current status of the SCATS project at the Oak Ridge National Laboratory (ORNL). Additional information on project background and requirements has been described previously (Bradley, et al., 1995).

  17. Army Energy Security Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARMY Energy Security Considerations Don Juhasz, PE, CEM HQDA, OACSIM, DAIM-FDF Telephone: (703)-601-0374 E-mail: don.juhasz@hqda.army.mil FUEL CELL OPPORTUNITIES 26 April 2007 1 of 10 Don Juhasz DAIM-FDF (703) 601-0374 (DSN 329) / don.juhasz@hqda.army.mil 5 April 2007 Army Energy * * * * FOREIGN OIL 2 of 10 Don Juhasz DAIM-FDF (703) 601-0374 (DSN 329) / don.juhasz@hqda.army.mil 5 April 2007 World Energy Situation OIL & GAS LIQUIDS 38% Rise in NTV Fuel Use 35% of DoD utilities 21% of Fed

  18. A database system for characterization of munitions items in conventional ammunition demilitarization stockpiles

    SciTech Connect (OSTI)

    Chun, K.C.; Chiu, S.Y.; Ditmars, J.D.; Huber, C.C.; Nortunen, L.; Sabb, R.

    1994-05-01

    The MIDAS (Munition Items Disposition Action System) database system is an electronic data management system capable of storage and retrieval of information on the detailed structures and material compositions of munitions items designated for demilitarization. The types of such munitions range from bulk propellants and small arms to projectiles and cluster bombs. The database system is also capable of processing data on the quantities of inert, PEP (propellant, explosives and pyrotechnics) and packaging materials associated with munitions, components, or parts, and the quantities of chemical compounds associated with parts made of PEP materials. Development of the MIDAS database system has been undertaken by the US Army to support disposition of unwanted ammunition stockpiles. The inventory of such stockpiles currently includes several thousand items, which total tens of thousands of tons, and is still growing. Providing systematic procedures for disposing of all unwanted conventional munitions is the mission of the MIDAS Demilitarization Program. To carry out this mission, all munitions listed in the Single Manager for Conventional Ammunition inventory must be characterized, and alternatives for resource recovery and recycling and/or disposal of munitions in the demilitarization inventory must be identified.

  19. Feasibility of white-rot fungi for biodegradation of PCP-treated ammunition boxes. Final report

    SciTech Connect (OSTI)

    Scholze, R.J.; Lamar, R.T.; Bolduc, J.; Dietrich, D.

    1995-01-01

    Millions of pounds of wood ammunition boxes treated with the wood preservative pentachiorophenol (PCP) are being stockpiled at military installations, primarily depots, because cost-effective disposal is not readily available. The Army needs cost-effective and environmentally benign treatment methods for destruction and disposal of PCP-treated wood products. This research investigated the use of white-rot fungi to biodegrade PCP-treated wood. Results showed that white-rot fungi effectively decreased the PCP concentration in contaminated hardwood and softwood chips. Under ideal laboratory conditions the fungi reduced the PCP concentration by 80 percent; a field study showed only a 30 percent decrease in PCP concentration. Despite this disparity, this study demonstrated the feasibility of using white-rot fungi to reduce PCP in treated wood.

  20. Army energy plan

    SciTech Connect (OSTI)

    Not Available

    1980-08-08

    The Army Energy Plan describes the current and projected (to the year 2000) energy situation in which the Department of the Army (DA) must operate and summarizes those actions and programs which have been developed and/or are needed to cope with those conditions. It addresses the Army goals, objectives, policies, and programs for all Army activities. World industrial growth during the past century has been characterized and hastened by the widespread availability of inexpensive energy, primarily petroleum. The Arab oil embargo of 1973 served to drive home a number of points, key among them being that the world's principal oil consumers are not the major oil producers. The Middle East and Africa have an estimated 67 percent of the petroleum reserves while Western Europe and the Western Hemisphere have only 16 percent. By most estimates, these reserves are expected to be exhausted within the next 70 years. In the year following the 1973 oil embargo, prices for petroleum rose threefold, signaling the end of the cheap oil. In the decade of the seventies, the price of imported crude oil has risen from $1.80 per barrel to an exorbitant $30.00 per barrel. The combined threats of exhaustion and high cost mandate the use of alternate sources of energy. The distribution of alternate sources of recoverable oil, such as tar sands and oil shale, favor the Western Hemisphere, but economical recovery techniques have not been developed.

  1. Making the Connection: Beneficial Collaboration Between Army...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies Making the Connection: Beneficial Collaboration Between Army Installations ...

  2. ARMY SERVICE FORCES

    Office of Legacy Management (LM)

    ARMY SERVICE FORCES ' -, 1 MANHATTAN ENGINEER DISTRICT --t 4 IN "LPLI RC,' LR io EIDM CIS INTELLIGENCE AND SECURITY DIVISION CHICAGO BRANCH OFFICE i ., -,* - P. 0. Box 6770-A I ' 1 .' CHICAGO 80. ILLINOIS /lvb 15 February 1945 Subject: shipment Security Survey at &Uinckrodt Chemical Works. MEMORANDUM to the Officer in Charge. 1. The Mallinckrodt Chemical Works, St. Louis, Missouri, was contacted by the undersigned on 16 November 1944, for the purpose of -king an investigation to

  3. Army Energy Initiatives Task Force

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Army Energy Initiatives Task Force.

  4. Application of powder metallurgy techniques for the development of non-toxic ammunition. Final CRADA report

    SciTech Connect (OSTI)

    Lowden, R.; Kelly, R.

    1997-05-30

    The purpose of the Cooperative Research and Development Agreement (CRADA) between Martin Marietta Energy Systems, Inc., and Delta Frangible Ammunition (DFA), was to identify and evaluate composite materials for the development of small arms ammunition. Currently available small arms ammunition utilizes lead as the major component of the projectile. The introduction of lead into the environment by these projectiles when they are expended is a rapidly increasing environmental problem. At certain levels, lead is a toxic metal to the environment and a continual health and safety concern for firearm users as well as those who must conduct lead recovery operations from the environment. DFA is a leading supplier of high-density mixtures, which will be used to replace lead-based ammunition in specific applications. Current non-lead ammunition has several limitations that prevent it from replacing lead-based ammunition in many applications (such as applications that require ballistics, weapon recoil, and weapon function identical to that of lead-based ammunition). The purpose of the CRADA was to perform the research and development to identify cost-effective materials to be used in small arms ammunition that eventually will be used in commercially viable, environmentally conscious, non-lead, frangible and/or non-frangible, ammunition.

  5. U.S. Army Corps of Engineers Delivers Cost and Schedule Validation...

    Energy Savers [EERE]

    for Hanford Waste Treatment Plant U.S. Army Corps of Engineers Delivers Cost and Schedule Validation for Hanford Waste Treatment Plant September 7, 2006 - 8:53am Addthis ...

  6. U.S. Army Corps of Engineers Delivers Cost and Schedule Validation for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Waste Treatment Plant | Department of Energy Army Corps of Engineers Delivers Cost and Schedule Validation for Hanford Waste Treatment Plant U.S. Army Corps of Engineers Delivers Cost and Schedule Validation for Hanford Waste Treatment Plant September 7, 2006 - 8:53am Addthis Corps Report Validates Cost of $12.2 billion and Construction Completion in November 2019 WASHINGTON, DC - The U.S. Department of Energy (DOE) today released the U.S. Army Corps of Engineers (USACE) report

  7. Army Announces $7 Billion Action to Support Renewable Energy

    Broader source: Energy.gov [DOE]

    The U.S. Army announced on August 7 that it has issued a $7 billion Request for Proposal to procure renewable and alternative energy on federal property through power purchase agreements. The $7 billion capacity would be expended for the purchase of energy over 30 years or less from renewable energy plants that are constructed and operated by contractors using private sector financing.

  8. Army Veteran Gains Experience at EM Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Veteran Gains Experience at EM Site Army Veteran Gains Experience at EM Site May 29, 2014 - 12:00pm Addthis Army Capt. Mark Spurlock is photographed while stationed in Afghanistan. Army Capt. Mark Spurlock is photographed while stationed in Afghanistan. Army Capt. Mark Spurlock Army Capt. Mark Spurlock Army Capt. Mark Spurlock is photographed while stationed in Afghanistan. Army Capt. Mark Spurlock AIKEN, S.C. - Army Capt. Mark Spurlock supports the EM program at the Savannah River Site as

  9. ARMY SERiWE FORCES

    Office of Legacy Management (LM)

    ' This doc~omnt consists tif-..$---..-- PaWs ?5-i3s4 " No.,J ______ d&---.copies. series.-f;;i, ' ARMY SERiWE FORCES UNITED STATES ' ENGINEER OFFICE MANHP.~AN Dwmtcr CHIWOO A\RU o,,,c* P. 0. 90x 3140 A CHICA so, ILrlNole 20 June 1945 F' '2 0 Subject: Licenae Agreement - International Pulverizing Corporation - Subcoritract #7401-37-82. To: The District~Eqinssr, U. S. Engineer Office, Manhattan District, Oak Ridge, Tennessee. Attention: Contract Section. As llsted'below, there are

  10. Army Energy Security Considerations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Energy Security Considerations Army Energy Security Considerations This presentation by Don Juhasz of the U.S. Army was given at the Fuel Cell Meeting in April 2007. fuel_cell_mtng_juhasz.pdf (1.36 MB) More Documents & Publications Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort Fairfield LP & Boralex Ashland LP: Federal Register Notice Vol 74 No 151 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure

  11. Department of the Army Letterhead

    Office of Environmental Management (EM)

    MCHB-TS-EON MEMORANDUM FOR Savannah River Site, Savannah River Nuclear Solutions (Mr. ... would turn to avoid overflight of Plant Vogtle Electric Power Generating Plant. ...

  12. DOE - Office of Legacy Management -- Twin Cities Ammunition - MN 0-01

    Office of Legacy Management (LM)

    Twin Cities Ammunition - MN 0-01 FUSRAP Considered Sites Site: TWIN CITIES AMMUNITION (MN.0-01) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: New Brighton , Minnesota MN.0-01-1 Evaluation Year: 1987 MN.0-01-2 Site Operations: Site was formerly licensed under 10CFR 70 by the NRC. MN.0-01-1 MN.0-01-2 Site Disposition: Eliminated - No Authority - Referred to DOD MN.0-01-1 Radioactive Materials Handled: None

  13. Army Industrial, Landscaping, and Agricultural Water Use

    SciTech Connect (OSTI)

    McMordie Stoughton, Kate; Loper, Susan A.; Boyd, Brian K.

    2014-09-18

    The Pacific Northwest National Laboratory conducted a task for the Deputy Assistant Secretary of the Army to quantify the Army’s ILA water use and to help improve the data quality and installation water reporting in the Army Energy and Water Reporting System.

  14. U.S. Army Corps of Engineers | Open Energy Information

    Open Energy Info (EERE)

    U.S. Army Corps of Engineers Jump to: navigation, search Logo: U.S. Army Corps of Engineers Name: U.S. Army Corps of Engineers Place: Michigan Phone Number: 1-888-694-8313 Website:...

  15. Army Net Zero: Guide to Renewable Energy Conservation Investment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Net Zero: Guide to Renewable Energy Conservation Investment Program (ECIP) Projects Army Net Zero: Guide to Renewable Energy Conservation Investment Program (ECIP) Projects...

  16. Energy Design Guides for Army Barracks: Preprint

    SciTech Connect (OSTI)

    Deru, M.; Zhivov, A.; Herron, D.

    2008-08-01

    The U.S. Army Corps of Engineers and NREL are developing target energy budgets and design guides to achieve 30% energy savings. This paper focuses the design guide for one type of barracks called unaccompanied enlisted personal housing.

  17. U.S. Army Toxic and Hazardous

    Office of Legacy Management (LM)

    ... ENCLOSURE 2 MILITARY INSTALLATIONS OTHER THAN ARMY FACILITIES c-Naval Ordnance Test Station P.O. Box 70 China Lake, CA ,-'Naval Auxiliary Air Station Salton Sea, CA Navy Yard ...

  18. Army Reserve Comprehensive Water Efficiency Assessments

    SciTech Connect (OSTI)

    McMordie Stoughton, Kate; Kearney, Jaime

    2015-04-14

    The Army Reserve has partnered with the Pacific Northwest National Laboratory (PNNL) to develop comprehensive water assessments for numerous Army Reserve Centers in all five regions including the Pacific islands and Puerto Rico, and at Fort Buchanan and Fort Hunter Liggett. The objective of these assessments is to quantify water use at the site, and identify innovative water efficiency projects that can be implemented to help reduce water demand and increase efficiency. Several of these assessments have focused on a strategic plan for achieving net zero water to help meet the Army’s Net Zero Directive . The Army Reserve has also leveraged this approach as part of the energy conservation investment program (ECIP), energy savings performance contracts (ESPCs), and utility energy service contracts (UESCs). This article documents the process involved.

  19. Army Energy and Water Reporting System Assessment

    SciTech Connect (OSTI)

    Deprez, Peggy C.; Giardinelli, Michael J.; Burke, John S.; Connell, Linda M.

    2011-09-01

    There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating

  20. Waste-to-Energy Projects at Army Installations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste-to-Energy Projects at Army Waste to Energy Projects at Army Installations Mr. Franklin H. Holcomb Chief, Energy Branch U.S U.S. Army . Army ERDC ERDC- -CERL CERL Champaign IL USA Champaign IL USA p g p g 13 JAN 2011 13 JAN 2011 US Army Corps of Engineers BUILDING STRONG ® Distribution Statement A -- Approved for public release; distribution is unlimited. Outline ƒ Background ► Intro to ERDC ► Army/DoD Energy Requirements & Objectives ► 2008 Installation WTE Workshop ► 2009

  1. Application for Department of the Army Permit: Engineering Form...

    Open Energy Info (EERE)

    Application for Department of the Army Permit: Engineering Form 4345 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Application for Department of the Army...

  2. US Army Corps of Engineers Website | Open Energy Information

    Open Energy Info (EERE)

    of Engineers Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: US Army Corps of Engineers Website Abstract Website of the US Army Corps of...

  3. Alaska District US Army Corps of Engineers | Open Energy Information

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Alaska District US Army Corps of Engineers Citation US Army Corps of...

  4. Ft. Carson Army Base, Colorado Springs, Colorado | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ft. Carson Army Base, Colorado Springs, Colorado Ft. Carson Army Base, Colorado Springs, Colorado Photo of High-Bay Aviation Maintenance Facility at Butts Army Airfield Fort Carson U.S. Army Base is located south of Colorado Springs, Colorado. It was the first Federal facility to install a "solar wall"-a solar ventilation air preheating system. The solar wall heats Ft. Carson's new high-bay aviation maintenance facility at Butts Army Airfield by pre-warming air as much as 54°F and

  5. U.S. Army Office of Energy Initiatives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    III. Designed to easily integrate with future energy security infrastructure Acts of Man Securing Army Installation Energy Acts of Nature High-voltage power lines with grid ...

  6. Army Corps of Engineers - Regulatory Guidance Letters | Open...

    Open Energy Info (EERE)

    Guidance Letters Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Corps of Engineers - Regulatory Guidance Letters Abstract This webpage...

  7. U S Army Corps of Engineers | Open Energy Information

    Open Energy Info (EERE)

    Contact Twitter: @detroitdistrict Facebook: https:www.facebook.compagesDetroit-District-US-Army-Corps-of-Engineers144354390916 References: EIA Form EIA-861 Final...

  8. U.S. Army TARDEC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Power & Energyfrom an Army Ground Vehicle Perspective Supporting a Hawaii Hydrogen Economy State of the States: Fuel Cells in America 2011...

  9. United States Army Corp of Engineers (ERDC) | Open Energy Information

    Open Energy Info (EERE)

    Engineers (ERDC) Jump to: navigation, search Hydro | Hydrodynamic Testing Facilities Name United States Army Corp of Engineers (ERDC) Address Coastal & Hydraulics Laboratory, 3909...

  10. Memorandum of Understanding Between United States Army Corps...

    Open Energy Info (EERE)

    Between United States Army Corps of Engineers and the Federal Energy Regulatory Commission on Non-Federal Hydropower Projects Jump to: navigation, search OpenEI Reference...

  11. Army Awards 20 Additional Contracts for Renewable Energy Technologies

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers awarded another 20 contracts to companies for biomass energy, solar energy, and wind energy technologies.

  12. Army Awards 20 Additional Contracts for Renewable Energy Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    awarded another 20 base contracts to companies for renewable energy-related technologies. ... to be developed by the approved companies, and involve no Army or Department of ...

  13. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WHITNEY POWERHOUSE MAJOR REHABILITATION Fort Worth District 23 June 2016 BUILDING STRONG ® Whitney Powerhouse BUILDING STRONG ® Whitney Power Plant Main Generating Units Rehab Project 3 BUILDING STRONG ® General Plant Information Whitney Powerhouse  30 MW capacity, Peaking Plant  Purpose - Flood Control, Hydropower, Recreation  Two vertical axis Francis units  Average annual energy produced - 73,000 MWH  Plant placed in service in 1953  Remote operated from Sam Rayburn Plant

  14. Renewable Energy Opportunities for the Army

    SciTech Connect (OSTI)

    Solana, Amy E.; States, Jennifer C.; Chvala, William D.; Weimar, Mark R.; Dixon, Douglas R.

    2008-08-13

    The Department of Defense (DoD) has a goal of obtaining 25% of its domestic electricity from renewable sources by 2025, and also must meet federal renewable energy mandates and schedules. This report describes the analyses undertaken to study the renewable resource potential at 15 Army sites, focusing on grid-connected generation of electricity. The resources analyzed at each site include solar, wind, geothermal, biomass, waste-to-energy, and ground source heat pumps (GSHPs). For each renewable generation resource, an assessment was completed to determine the level of resource availability, and the price at which that resource would be available for electricity generation. Various design alternatives and available technologies were considered in order to determine the best way to utilize each resource and maximize cost-effective electricity generation. Economic analysis used multiple funding options, including investment by an independent power producer (IPP), Energy Savings Performance Contract (ESPC), and Energy Conservation Investment Program (ECIP), and considered tax incentives, renewable energy credits, and other economic factors to reveal the most realistic costs possible. Where resource options proved to be economically viable, implementation approaches were recommended. The intention was to focus each installations efforts on realistic projects, moving them from initial assessment through the design and financing to implementation. Many Army sites enjoy very low costs of electricity, limiting the number of cost-effective renewable energy options where resources are available. Waste-to-energy was often a viable option due to the additional revenue gathered from transferred tipping fees. GSHPs were also commonly cost-effective options for replacement in inefficient buildings. Geothermal, wind, and solar resources are found to be more available in certain parts of the country over others, reducing overall potential for use. Wind is variable and often most

  15. Chief Information Officer Talks Savannah River Site Cybersecurity with Army

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    School | Department of Energy Chief Information Officer Talks Savannah River Site Cybersecurity with Army School Chief Information Officer Talks Savannah River Site Cybersecurity with Army School April 15, 2016 - 12:35pm Addthis Lewann Belton, left, director of the Cyber and Information Technology Division at DOE’s Savannah River Operations Office, visits the headquarters of the U.S. Army Cyber School at Fort Gordon, Ga. He was greeted by the school’s staff, from left, Todd

  16. Department of Energy, Department of the Interior and Army Corps...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... "As a leader in the hydropower industry, the Army is proud of our hydroelectric generation and ... and deployment at non-powered dams and conduits, where there is potential ...

  17. Army Enhanced Use Lease (EUL) website | Open Energy Information

    Open Energy Info (EERE)

    Lease (EUL) website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Enhanced Use Lease (EUL) website Abstract This website provides information...

  18. Army Net Zero: Guide to Renewable Energy Conservation Investment Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ECIP) Projects | Department of Energy Net Zero: Guide to Renewable Energy Conservation Investment Program (ECIP) Projects Army Net Zero: Guide to Renewable Energy Conservation Investment Program (ECIP) Projects This guide is intended to serve as a desk reference for energy managers at Army installations who are preparing renewable energy (RE) Energy Conservation Investment Program (ECIP) applications. The guide provides practical information on six RE technologies and walks the energy

  19. Commander, Seneca Army Depot Attention: Thomas Stincic, Safety Officer

    Office of Legacy Management (LM)

    9 1986 Department of Energy Washington, D .C. 20545 . Commander, Seneca Army Depot Attention: Thomas Stincic, Safety Officer Romulus, New York 14541 Dear Mr. Stincic: As you are aware, the Department of Energy is evaluating the radiological condition of sites formerly used by Department predecessors during the early years of nuclear energy development , and a portion of the Seneca Army Depot was identified as one such site. While our preliminary inves-tiga- tions did identify residual

  20. NEPA mitigation and monitoring activities on Army installations

    SciTech Connect (OSTI)

    Reinke, D.C.; Robitaille, P.

    1995-12-01

    The Army National Environmental Policy Act (NEPA) implementation regulation AR 200-2 (Army Regulation) requires only mitigation measures that can reasonably be accompanied as part of a proposed alternative be identified in the NEPA document. Failure of the identified mitigation actions to be executed or to perform as expected leads to a required reevaluation of the project and the significance of its impacts. The USAEC has undertaken a study of mitigation and monitoring actions listed in Army NEPA documents. As part of the USAEC NEPA program the study has outlined three major tasks (1) collection of a significant sample of Army NEPA documents, (2) review environmental documentation management and retention, and (3) review in detail a subsample of documents and follow-up with site visits. Some 242 Army NEPA documents, Environmental Assessments (EA) and Environmental Impact Statements (EIS) were collected and evaluated for mitigation requirements. Ninety seven of the 242 NEPA documents committed to one or more mitigation actions. While a wide array of mitigating activities have been identified in these documents, the four most common are (1) management plans and practices, (2) training actions, (3) revegetation actions, and (4) construction practices. Site visits to selected Army installations showed that mitigation practices were for the most part being done, but were poorly documented. No installation visited had a mitigation monitoring plan in place as required by AR 200-2.

  1. NREL and Army Validate Energy Savings for Net Zero Energy Installations -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases | NREL NREL and Army Validate Energy Savings for Net Zero Energy Installations Net Zero Energy Installations could save millions a year in energy costs October 27, 2014 The U.S. Army (Army) has partnered with the Energy Department's National Renewable Energy Laboratory (NREL) to increase energy security through improved energy efficiency and optimized renewable energy strategies at nine installations in the Army's portfolio. If all nine of the Army Net Zero Energy Installation

  2. U.S. Army Fort Carson Interconnection Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Agreement U.S. Army Fort Carson Interconnection Agreement Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA). Download the U.S. Army Fort Carson interconnection agreement. (1.77 MB) More Documents & Publications U.S. Army Fort Carson Interconnection Agreement Fort Carson Photovoltaic System U.S. Army Fort Carson Environmental Document GovEnergy 2008 Session

  3. The U.S. Army`s environmental compliance assessment in Germany, a case study

    SciTech Connect (OSTI)

    Schlessman, D.C.

    1995-12-01

    The U.S. Army, Europe (USAREUR) in 1995 is initiating the Army-wide program of assessing environmental compliance at each of its installations. The first assessment was done in Germany in January and is the basis of this study. These assessments are the conerstone of USAREUR`s compliance standards: air emissions, drinking and waste water standards, environmental noise, radon, asbestos, underground storage tanks, hazardous material and petroleum management, and pesticides. Also covered are areas of waste management to include solid, hazardous, and medical wastes and special requirements for handling and disposal of polychlorinated bi- & terphenyls. In addition policy and other science areas are checked. These include environmental program management, environmental effects analysis, endangered species and natural resource protection, and historical and cultural resource preservation. The ECAS`s breadth of medias assessed gives a comprehensive look at the environmental posture of an installation. One of the two manuals used in each assessment is based on the Department of Defense (DOD) environmental final governing standards (FGS). Each overseas country that has a substantial DOD long-term presence has a FGS. The FGS is developed by a DOD appointed executive agent. He compared the DOD baseline of environmental standards (based on U.S. law and DOD policy) and the HN`s environmental standards. From this comparison the standard that is most protective of human health and the environment is selected as the FGS. In Germany, the FGS, and thus the ECAS manual are substantially based on the German standards. This is due tot he well developed environmental standards found in Germany. This study provides the first look at the USAREUR ECAS process and the major changes required in a USAREUR community`s environmental compliance posture to meet the German FGS. The January Anbach ECAS is the first time a community in USAREUR was assessed using the fully operational ECAS.

  4. Pollution prevention opportunity assessment of the United States Army Corps of Engineers Garrison Dam Hydroelectric Powerplant, Riverdale, North Dakota. Report for March-September 1994

    SciTech Connect (OSTI)

    Bowman, D.; Buschow, R.; Smith, J.

    1995-08-01

    The report describes the results of pollution prevention opportunity assessments conducted at a representative U.S. Army Corps of Engineers civil works dam and hydroelectric power plant. Recommended methods for reducing pollution resulting primarily from the operation of these facilities are addressed.

  5. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydropower 5-year Plan and MIL The Risk Factors CESWD-PDO 22 June 2016 BUILDING STRONG ® Ranking Criteria for Capitalized Work in Plants (Ranking Worksheet) Hydropower Relative Risk Index (1-5)- Primary Ranking *Condition Index *Consequence Rating Criteria *Hydropower Relative Risk Values Availability Risk Public Safety and Health Environmental Concerns Legal Concerns Impact to Other Business Lines Formulate a Condition Index Rank- 1=High Risk; 5= Minimal Risk 2 BUILDING STRONG ® Integration

  6. Army Reserve Expands Net Zero Energy, Water, Waste

    SciTech Connect (OSTI)

    Solana, Amy E.

    2015-04-14

    In 2012, the Army initiated a Net Zero (NZ) program to establish NZ energy, water, and/or waste goals at installations across the U.S. In 2013, the U.S. Army Reserve expanded this program to cover all three categories at different types of Reserve Centers (RCs) across 5 regions. Projects identified at 10 pilot sites resulted in an average savings potential from recommended measures of 90% for energy, 60% for water, and 83% for waste. This article provides results of these efforts.

  7. DOE - Office of Legacy Management -- Seneca Army Depot - NY 11

    Office of Legacy Management (LM)

    Seneca Army Depot - NY 11 FUSRAP Considered Sites Site: SENECA ARMY DEPOT (NY.11 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Romulus , New York Evaluation Year: 1985 NY.11-2 NY.11-3 Site Operations: Eleven bunkers were used to store approximately 2,000 drums of pitchblende ore in the early 1940's. The bunkers were returned to munitions storage service after removal of the ore drums. NY.11-4 Site Disposition: Eliminated - Referred to

  8. U.S. Army Corps of Engineers' Nationwide Permit Information Website...

    Open Energy Info (EERE)

    U.S. Army Corps of Engineers' Nationwide Permit Information Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: U.S. Army Corps of Engineers'...

  9. U.S. Army Corps of Engineers Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Army Corps of Engineers Sites U.S. Army Corps of Engineers Sites U.S. Army Corps of Engineers Sites Transfer of Remediated FUSRAP Sites to DOE Office of Legacy Management In 1997, Congress directed the U.S. Army Corps of Engineers (USACE) to conduct assessment, remedial action, and site closure activities for Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. The DOE Office of Legacy Management (LM) retains responsibility for determining eligibility for site cleanup under

  10. U.S. Army Fort Carson Environmental Document | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Document U.S. Army Fort Carson Environmental Document Document describes the sample environmental planning for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA). Download the U.S. Army Fort Carson environmental document. (2.59 MB) More Documents & Publications U.S. Army Fort Carson Photovoltaics Project Lease Paducah Site Management Plan ULP_MAP

  11. US Army Research Office research in progress, July 1, 1991--June 30, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    The US Army Research Office, under the US Army Materiel Command (AMC), is responsible for coordinating and supporting research in the physical and engineering sciences, in materials science, geosciences, biology, and mathematics. This report describes research directly supported by the Army Research Projects Agency, and several AMC and other Army commands. A separate section is devoted to the research program at the US Army Research, Development and Standardization Group - United Kingdom. The present volume includes the research program in physics, chemistry, biological sciences, mathematics, engineering sciences, metallurgy and materials science, geosciences, electronics, and the European Research Program. It covers the 12-month period from 1 July 1991 through 30 June 1992.

  12. Notices SUMMARY: The U.S. Army Corps of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    602 Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices SUMMARY: The U.S. Army Corps of Engineers (USACE) intends to prepare a Draft Integrated Feasibility Report and Environmental Impact Statement (DIFR- EIS) for the Coastal Texas Protection and Restoration Feasibility Study. This study will identify and evaluate the feasibility of developing a comprehensive plan for flood risk management, hurricane and storm risk management, and ecosystem restoration for the coastal areas

  13. Implementation of Army privatization directives at Forscom installations

    SciTech Connect (OSTI)

    Armstrong, R.C.; Patwardhan, S.

    1997-06-01

    {open_quotes}Privatization{close_quotes} has become the buzzword of the 1990s not only here in the United States but throughout the world. Privatization has been traditionally defined as the sale/transfer of state-owned (i.e. federal, state, county, city or public) assets to the private sector. Although there are numerous reasons for the privatization of state-owned assets, the primary reasons include the generation of a significant amount of cash to the state (Great Britain`s sale of electric power industry); capitalization of the formerly state-owned utility (sale of the utilities within many countries of the former Soviet Union); and state policy goals of eliminating monopolies, encouraging competition, and restructuring (Chile). Several year ago, the Department of Defense (DoD) and specifically the Department of Army (DoA) initiated its own `Privatization Process`. Coupled with shrinking budgets, workforce and funding resources from the Government, the Army was faced with antiquated utility infrastructure in need of significant upgrades and in some cases total replacements. Recognizing that the provision of utility services was not a core mission of the Army, DoA has encouraged its Installations throughout the country to consider the privatization of the Government-owned utility systems. In compliance with DoA policy, Forces Command (FORSCOM) has been at the forefront of the privatization process. To date, FORSCOM has initiated the process of analyzing the potential privatization of over 30 utility systems at 12 FORSCOM Installations located throughout the country. The FORSCOM Installations include Fort Irwin, CA; Fort Campbell, KY; Fort Bragg, NC; Fort McPherson, GA; Fort Hood, TX; Fort Polk, LA; Fort Lewis, WA; Fort Riley, KS; Fort Stewart, GA; Hunter Army Airfield, GA; Fort Carson, CO; Fort Devens, MA; Fort Dix, NJ; and Fort Gillem, GA.

  14. Preliminary assessment report for Virginia Army National Guard Army Aviation Support Facility, Richmond International Airport, Installation 51230, Sandston, Virginia

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-09-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Virginia Army National Guard (VaARNG) property in Sandston, Virginia. The Army Aviation Support Facility (AASF) is contiguous with the Richmond International Airport. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The PA is designed to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. The AASF, originally constructed as an active Air Force interceptor base, provides maintenance support for VaARNG aircraft. Hazardous materials used and stored at the facility include JP-4 jet fuel, diesel fuel, gasoline, liquid propane gas, heating oil, and motor oil.

  15. America's Atomic Army: The Historical Archaeology of Camp Desert Rock

    SciTech Connect (OSTI)

    Susan R. Edwards

    2007-11-02

    Established in 1951, Camp Desert Rock served as the training ground for America's 'Atomic Army'. For the next six years, U.S. ground troops traveled to the Nevada desert to participate in military maneuvers during atmospheric atomic weapons testing. Nearly 60,000 soldiers received physical and psychological training in atomic warfare. Abandoned when atmospheric testing ended, Camp Desert Rock was dismantled and its buildings moved to other locations. Today, the camp appears as a sterile expanse of desert marked by rock-lined tent platforms, concrete foundations, and trash scatters. Although visually unimposing, the site is rich with the history of America's nuclear testing program.

  16. Disposal of chemical agents and munitions stored at Anniston Army Depot, Anniston, Alabama

    SciTech Connect (OSTI)

    Hunsaker, D.B. Jr.; Zimmerman, G.P.; Hillsman, E.L.; Miller, R.L.; Schoepfle, G.M.; Johnson, R.O.; Tolbert, V.R.; Kroodsma, R.L.; Rickert, L.W.; Rogers, G.O.; Staub, W.P.

    1990-09-01

    The purpose of this Phase I report is to examined the proposed implementation of on-site disposal at Anniston Army Depot (ANAD) in light of more detailed and more recent data than those included in the Final Programmatic Environmental Impact Statement (EPEIS). Two principal issues are addressed: (1) whether or not the new data would result in identification of on-site disposal at ANAD as the environmentally preferred alternative (using the same selection method and data analysis tools as in the FPEIS), and (2) whether or not the new data indicate the presence of significant environmental resources that could be affected by on-site disposal at ANAD. In addition, a status report is presented on the maturity of the disposal technology (and now it could affect on-site disposal at ANAD). Inclusion of these more recent data into the FPEIS decision method resulted in confirmation of on-site disposal for ANAD. No unique resources with the potential to prevent or delay implementation of on-site disposal at ANAD have been identified. A review of the technology status identified four principal technology developments that have occurred since publication of the FPEIS and should be of value in the implementation of on-site disposal at ANAD: the disposal of nonlethal agent at Pine Bluff Arsenal, located near Pine Bluff, Arkansas; construction and testing of facilities for disposal of stored lethal agent at Johnston Atoll, located about 1300 km (800 miles) southwest of Hawaii in the Pacific Ocean; lethal agent disposal tests at the chemical agent pilot plant operations at Tooele Army Depot, located near Salt Lake City, Utah; and equipment advances. 18 references, 13 figs., 10 tabs.

  17. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Reserve 63 d RSC Achieves 85% Savings in Parking Lot Lighting In early 2013 the Army Reserve 63 d Regional Support Command (63 d RSC) began working with Pacifc Northwest National Laboratory (PNNL) and the Army Reserve Installation Management Division (ARIMD) to identify energy and water conservation opportunities. The following year, the 63 d RSC installed LED fxtures for outdoor lighting at several facilities. One of these projects, a parking lot lighting retroft in Little Rock, Arkansas,

  18. The 1991 Department of the Army Service Response Force exercise: Procedural Guide SRFX-91

    SciTech Connect (OSTI)

    Madore, M.A.; Thomson, R.S.; Haffenden, R.A.; Baldwin, T.E.; Meleski, S.A.

    1991-09-01

    This procedural guide was written to assist the US Army in planning for a chemical emergency exercise at Tooele Army Depot in Utah. The roles of various members of the emergency response community are described for various accident scenarios, and the relationships between the various responders are identified. For the June 1991 exercise at Tooele, the emergency response community includes the command structure at Tooele Army Depot; the US Army Service Response Force and other Department of Defense agencies; emergency response personnel from Tooele, Salt Lake, and Utah counties and municipal governments; the Utah Comprehensive Emergency Management Agency and other state agencies; and various federal agencies.

  19. Sandia Energy - Sandia and the U.S. Army Collaborate on Operational...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Energy Surety Grid Integration Partnership News News & Events SMART Grid Microgrid Energy Storage Systems Sandia and the U.S. Army Collaborate on Operational Energy at...

  20. U.S. Army Battalion Tours Portsmouth Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Army Battalion Tours Portsmouth Site U.S. Army Battalion Tours Portsmouth Site March 16, 2016 - 12:00pm Addthis Portsmouth Site Director Dr. Vince Adams (left) presents U.S. Army Major Ryan Watson with a framed photo of the Portsmouth Decontamination and Decommissioning Project. In the foreground from left are EM Federal Project Director Jud Lilly, Adams, Watson, and Fluor-BWXT Site Project Director Dennis Carr. Portsmouth Site Director Dr. Vince Adams (left) presents U.S. Army Major Ryan

  1. EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Energy Management Program (FEMP) developed a Memorandum of Understanding ... Related Articles U.S. Army Corps of Engineers and FEMP Partner to Drive Down Federal ...

  2. U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-04-01

    FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

  3. U.S. Army Fort Knox: Using the Earth for Space Heating and Cooling

    SciTech Connect (OSTI)

    2010-04-01

    FEMP case study overview of the geothermal/ground source heat pump project at the U.S. Army Fort Knox Disney Barracks.

  4. US Army Weapon Systems Human-Computer Interface (WSHCI) style guide, Version 1

    SciTech Connect (OSTI)

    Avery, L.W.; O`Mara, P.A.; Shepard, A.P.

    1996-09-30

    A stated goal of the U.S. Army has been the standardization of the human computer interfaces (HCIS) of its system. Some of the tools being used to accomplish this standardization are HCI design guidelines and style guides. Currently, the Army is employing a number of style guides. While these style guides provide good guidance for the command, control, communications, computers, and intelligence (C4I) domain, they do not necessarily represent the more unique requirements of the Army`s real time and near-real time (RT/NRT) weapon systems. The Office of the Director of Information for Command, Control, Communications, and Computers (DISC4), in conjunction with the Weapon Systems Technical Architecture Working Group (WSTAWG), recognized this need as part of their activities to revise the Army Technical Architecture (ATA). To address this need, DISC4 tasked the Pacific Northwest National Laboratory (PNNL) to develop an Army weapon systems unique HCI style guide. This document, the U.S. Army Weapon Systems Human-Computer Interface (WSHCI) Style Guide, represents the first version of that style guide. The purpose of this document is to provide HCI design guidance for RT/NRT Army systems across the weapon systems domains of ground, aviation, missile, and soldier systems. Each domain should customize and extend this guidance by developing their domain-specific style guides, which will be used to guide the development of future systems within their domains.

  5. Revision of Army regulation (AR) 200-2, environmental effects of Army actions, and the application of total quality mangement (TQM) principles

    SciTech Connect (OSTI)

    Merkel, H,K.; Robitaille, P.

    1995-12-01

    AR 200-2 is the Army`s implementing regulation to the National Environmental Policy Act (NEPA) and DoD`s NEPA Directive DoDD 6050.1. AR 200-2 was last revised in the late 1980s and since then the scope of Army NEPA compliance activities have significantly increased, and NEPA practice and case law are continually changing. The purpose of revising AR 200-2 is to provide Army personel with clear and Concise guidance on how to meet their NEPA compliance requirements. The revision process included reviewing the current AR 200-2 to identify areas and topics needing clarification or modification; conferring with Army NEPA personnel to obtain views on NEPA compliance practices and procedures; conducting a review and analysis of significant, recent developments in NEPA case law; reviewing other federal NEPA implementing regulations to identify useful, transferrable concepts; preparing a {open_quotes}strawman{close_quotes} version of AR 200-2 to use as a starting point in the revision process; coordinating and consolidating input from the AR 200-2 Revisions Steering Committee; and responding to review comments. A draft version of AR 200-2 has been completed and informal Army-wide comments have been addressed. Some of the issues that the AR 200-2 Revisions Steering Committee considered during the revision effort included expanding the list of categorical exclusions, determining the appropriate length for the public comment period for environmental assessments prior to approval of the finding of no significant impact, determining the appropriate level of analysis for Army actions abroad, and determining whether Comprehensive Environmental Response Compensation Liability Act (CERCLA) or Resource Conservation and Recovery Act (RCRA) actions should be addressed under NEPA. Total Quality Management (TQM) principles were applied during the revision process. GroupSystems{trademark} software was used as a vehicle to enhance total group participation from managers to practitioners.

  6. Waste-to-Energy Projects at Army Installations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects at Army Installations Waste-to-Energy Projects at Army Installations Presentation by Franklin H. Holcomb, U.S. Army ERDC-CERL, at the DOE-DOD Waste-to-Energy using Fuel Cells Workshop held Jan. 13, 2011 waste_holcomb.pdf (2.81 MB) More Documents & Publications Report of the DOD-DOE Workshop on Converting Waste to Energy Using Fuel Cells: Workshop Summary and Action Plan Net Zero Waste - Tools and Technical Support ...and other observations DOD -DOE MOU WTE Using Fuel Cells Briefing

  7. U.S. Army Corps of Engineers and FEMP Partner to Drive Down Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Costs | Department of Energy Army Corps of Engineers and FEMP Partner to Drive Down Federal Energy Costs U.S. Army Corps of Engineers and FEMP Partner to Drive Down Federal Energy Costs March 4, 2015 - 4:47pm Addthis The U.S. Army Corps of Engineers (USACE) and the U.S. Department of Energy's Federal Energy Management Program (FEMP) developed a partnership to help drive down the federal government's energy costs through the government-wide adoption of performance contracting processes.

  8. EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner to Drive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Down Federal Energy Costs | Department of Energy and U.S. Army Corps of Engineers Partner to Drive Down Federal Energy Costs EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner to Drive Down Federal Energy Costs March 26, 2015 - 2:12pm Addthis With hundreds of thousands of facilities and vehicles spread across the globe, the United States government is one of the world's largest consumers of energy. The U.S. Army Corps of Engineers (USACE) and the U.S. Department of Energy's

  9. AMO Provides Technical Assistance to First Ever CHP Project at a U.S. Army

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Installation | Department of Energy Provides Technical Assistance to First Ever CHP Project at a U.S. Army Installation AMO Provides Technical Assistance to First Ever CHP Project at a U.S. Army Installation August 2, 2016 - 11:03am Addthis From left to right: Col. James E. Davis, Commander of the U.S. Army Garrison Aberdeen Proving Ground; Wayne Harbaugh, Energy Efficiency Program Director from Baltimore Gas and Electric; Dr. Kathleen Hogan, Deputy Assistant Secretary for Energy Efficiency;

  10. Small arms ammunition

    DOE Patents [OSTI]

    Huerta, Joseph

    1992-01-01

    An elongate projectile for small arms use has a single unitary mass with a hollow nose cavity defined by a sharp rigid cutting edge adapted to make initial contact with the target surface and cut therethrough. The projectile then enters the target mass in an unstable flight mode. The projectile base is substantially solid such that the nose cavity, while relatively deep, does not extend entirely through the base and the projectile center of gravity is aft of its geometric center.

  11. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    SciTech Connect (OSTI)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  12. US Army Radiological Bioassay and Dosimetry: The RBD software package

    SciTech Connect (OSTI)

    Eckerman, K. F.; Ward, R. C.; Maddox, L. B.

    1993-01-01

    The RBD (Radiological Bioassay and Dosimetry) software package was developed for the U. S. Army Material Command, Arlington, Virginia, to demonstrate compliance with the radiation protection guidance 10 CFR Part 20 (ref. 1). Designed to be run interactively on an IBM-compatible personal computer, RBD consists of a data base module to manage bioassay data and a computational module that incorporates algorithms for estimating radionuclide intake from either acute or chronic exposures based on measurement of the worker's rate of excretion of the radionuclide or the retained activity in the body. In estimating the intake,RBD uses a separate file for each radionuclide containing parametric representations of the retention and excretion functions. These files also contain dose-per-unit-intake coefficients used to compute the committed dose equivalent. For a given nuclide, if measurements exist for more than one type of assay, an auxiliary module, REPORT, estimates the intake by applying weights assigned in the nuclide file for each assay. Bioassay data and computed results (estimates of intake and committed dose equivalent) are stored in separate data bases, and the bioassay measurements used to compute a given result can be identified. The REPORT module creates a file containing committed effective dose equivalent for each individual that can be combined with the individual's external exposure.

  13. Title 32 CFR 651 Environmental Analysis of Army Actions (AR 200...

    Open Energy Info (EERE)

    of Army Actions (AR 200-2) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 32 CFR 651...

  14. Army National Guard (ARNG) Objective Supply Capability Adaptive Redesign (OSCAR) end-user manual

    SciTech Connect (OSTI)

    Pelath, R.P.; Rasch, K.A.

    1997-12-01

    The Objective Supply Capability Adaptive Redesign (OSCAR) project is designed to identify and develop programs which automate requirements not included in standard army systems. This includes providing automated interfaces between standard army systems at the National Guard Bureau (NGB) level and at the state/territory level. As part of the OSCAR project, custom software has been installed at NGB to streamline management of major end items. This software allows item managers to provide automated disposition on excess equipment to states operating the Standard Army Retail Supply System Objective (SARSS-O). It also accelerates movement of excess assets to improve the readiness of the Army National Guard (ARNG)--while reducing excess on hand. The purpose of the End-User Manual is to provide direction and guidance to the customer for implementing the ARNG Excess Management Program.

  15. Title 33 CFR 325 Appendix B Processing of Department of the Army...

    Open Energy Info (EERE)

    5 Appendix B Processing of Department of the Army Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 33 CFR 325...

  16. Making the Connection: Beneficial Collaboration Between Army Installations and Energy Utility Companies

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers a RAND study to develop recommendations for improving Army installation collaboration with utilities to reduce traditional energy usage.

  17. FEMP and U.S. Army Corps of Engineers Partner to Drive Down Federal Energy Costs

    Broader source: Energy.gov [DOE]

    With hundreds of thousands of facilities and vehicles spread across the globe, the United States government is one of the worlds largest consumers of energy. The U.S. Army Corps of Engineers ...

  18. EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order

    Office of Energy Efficiency and Renewable Energy (EERE)

    BAGRAM AIRFIELD, Afghanistan – EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army.

  19. Army Net Zero: Energy Roadmap and Program Summary, Fiscal Year 2013 (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-08-01

    The U.S. Army (Army) partnered with the National Renewable Energy Laboratory (NREL) and the U.S. Army Corps of Engineers to assess opportunities for increasing energy security through improved energy efficiency and optimized renewable energy strategies at nine installations across the Army's portfolio. Referred to as Net Zero Energy Installations (NZEIs), these projects demonstrate and validate energy efficiency and renewable energy technologies with approaches that can be replicated across DOD and other Federal agencies, setting the stage for broad market adoption. This report summarizes the results of the energy project roadmaps developed by NREL, shows the progress each installation could make in achieving Net Zero Energy by 2020, and presents lessons learned and unique challenges from each installation.

  20. U.S. Army Energy and Environmental Requirements and Goals: Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Fuel Cells and Hydrogen - Facility Locations and Hydrogen Storage/Delivery Logistics | Department of Energy U.S. Army Energy and Environmental Requirements and Goals: Opportunities for Fuel Cells and Hydrogen - Facility Locations and Hydrogen Storage/Delivery Logistics U.S. Army Energy and Environmental Requirements and Goals: Opportunities for Fuel Cells and Hydrogen - Facility Locations and Hydrogen Storage/Delivery Logistics Overview of DoD Energy Use, Federal Facilities Goals and

  1. Former Army Ranger wins Sandia-sponsored student of the year award |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Former Army Ranger wins Sandia-sponsored student of the year award Monday, July 25, 2016 - 9:42am Las Positas College student Damon Alcorn receives the Chamber/Sandia Student of the Year Award. From left, Las Positas College President Barry Russell, Damon Alcorn, and Sandia/California Community Relations Officer Madeline Burchard. Former Army Ranger Damon Alcorn recently received the Sandia National Laboratories-Livermore Chamber of Commerce

  2. Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility: Preprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility Preprint Rois Langner and Michael Deru National Renewable Energy Laboratory Alexander Zhivov, Richard Liesen, and Dale Herron U.S. Army Engineer Research and Development Center Presented at the 2012 ASHRAE Winter Conference Chicago, Illinois January 21-25, 2012 Conference Paper NREL/CP-5500-53810 March 2012 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy,

  3. Excess Titanium from NNSA's Y-12 Plant to be Used by the Army for New

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology Laboratory in Morgantown | Department of Energy Excerpts of Energy Secretary Ernest Moniz's Remarks at National Energy Technology Laboratory in Morgantown Excerpts of Energy Secretary Ernest Moniz's Remarks at National Energy Technology Laboratory in Morgantown July 29, 2013 - 8:00am Addthis News Media Contact (202) 586-4940 WASHINGTON - On Monday, July 29, 2013, Secretary Moniz will visit the National Energy Technology Laboratory (NETL) in Morgantown, W. Va. Moniz will tour the

  4. Department of Energy, Department of the Interior and Army Corps of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engineers Renew Five-Year Partnership to Advance Hydropower | Department of Energy Energy, Department of the Interior and Army Corps of Engineers Renew Five-Year Partnership to Advance Hydropower Department of Energy, Department of the Interior and Army Corps of Engineers Renew Five-Year Partnership to Advance Hydropower March 24, 2015 - 3:56pm Addthis NEWS MEDIA CONTACT 202-586-4940 DOENews@hq.doe.gov WASHINGTON - The U.S. Department of Energy, U.S. Department of the Interior and U.S.

  5. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting Case study describes how the Army Reserve 63d Regional Support Command (RSC) achieved 85% energy savings and $4,000 per year in cost savings by replacing 12 old light fixtures with light-emitting diode fixtures in the military equipment parking area. This project was part of a camp-wide parking lighting retrofit which, on average, delivered 78%

  6. Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report

    SciTech Connect (OSTI)

    1991-06-14

    This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

  7. Testing Synthetic Fuels for Use in U.S. Army Ground Vehicles | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Synthetic Fuels for Use in U.S. Army Ground Vehicles Testing Synthetic Fuels for Use in U.S. Army Ground Vehicles Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. 2006_deer_dobbs.pdf (562.23 KB) More Documents & Publications Fuel Cells & Alternative Fuels Virent is Replacing Crude Oil Biodiesel_Fuel_Management_Best_Practices_Report.pdf

  8. DOE - Office of Legacy Management -- Granite City Army Depot - IL 0-02

    Office of Legacy Management (LM)

    Granite City Army Depot - IL 0-02 FUSRAP Considered Sites Site: GRANITE CITY ARMY DEPOT ( IL.0-02 ) Eliminated from consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Granite City , Illinois IL.0-02-1 Evaluation Year: 1987 IL.0-02-1 Site Operations: Site was used for storage of GSA thorium residues until circa 1964. IL.0-02-1 Site Disposition: Eliminated - Referred to DOD IL.0-02-1 Radioactive Materials Handled: Yes Primary Radioactive

  9. U.S. Army Fort Carson Photovoltaics Project Lease | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photovoltaics Project Lease U.S. Army Fort Carson Photovoltaics Project Lease Document describes the project lease issued for the Fort Carson photovoltaic (PV) power purchase agreement (PPA). Download the U.S. Army Fort Carson photovoltaics project lease. (685.57 KB) More Documents & Publications SCT&E LNG, LLC - FE Dkt. No. 14-72-LNG SCT&E LNG, LLC - FE Dkt. No. 14-89-LNG SCT&E LNG, LLC - FE DKT. NO. 14-98-LNG NFTA

  10. Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility; Preprint

    SciTech Connect (OSTI)

    Langner, R.; Deru, M.; Zhivov, A.; Liesen, R.; Herron, D.

    2012-03-01

    This paper describes the integrated energy optimization process for buildings and building clusters and demonstrates this process for new construction projects and building retrofits. An explanation is given of how mission critical building loads affect possible site and source energy use reduction in Army buildings.

  11. Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners

    SciTech Connect (OSTI)

    Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

    2007-05-25

    This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

  12. Army Reserve 63d RSC Achieves 85% Savings in Parking Lot Lighting

    SciTech Connect (OSTI)

    2016-01-01

    Case study describes how the Army Reserve 63d Regional Support Command (RSC) achieved 85% energy savings and $4,000 per year in cost savings by replacing 12 old light fixtures with light-emitting diode fixtures in the military equipment parking area. This project was part of a camp-wide parking lighting retrofit which, on average, delivered 78% energy savings and a simple payback of 4.4 years.

  13. Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations

    SciTech Connect (OSTI)

    Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

    2010-03-09

    This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  14. Basewide energy systems plan for Fort Bragg. Womack Army Community Hospital. Energy audit: Executive summary. Final report

    SciTech Connect (OSTI)

    1984-04-01

    The results of the energy engineering analysis performed at Womack Army Community Hospital, located in Fort Bragg, North Carolina, are summarized herein. That work was performed by JRB Associates (JRB) for the Army Corps of Engineers, Savannah District, under a modification to contract No. DACA21-80-C-0014. The project included a detailed audit of the hospital and energy support facilities, utility meter plan development, and investigation of many energy conservation measures. Emphasis was put on Energy Management and Control Systems (EMCS). Analysis was performed with the assistance of the Building Loads and System Thermodynamics (BLAST) computer program developed by the Army Construction Engineering Research Lab (CERL). Energy Conservation Investment Program (ECIP) documents were developed for recommended measures.

  15. Army War College final prototype optical disk system testing and evaluation report

    SciTech Connect (OSTI)

    Klein, A.J.; Gillespie, S.J.

    1990-03-01

    This report documents the continuation of the PC-based optical disk retrieval-storage system testing and evaluation activities that Data Systems Research and Development (DSRD) staff have performed over the last year for the Army War College (AWC), Carlisle, Pennsylvania. A previous report (see Army War College Optical Disk System Test and Evaluation Report, K/DSRD-74, April 1989) detailed the performance testing results of the initial two prototype optical disk systems evaluated by DSRD. Based on the results of this prototype system testing and evaluation, the AWC selected the SAIC/LaserData system for further development and testing. This report describes the development activities that were performed to enhance the SAIC/LaserData system for further development and testing. This report describes the development activities that were performed to enhance the SAIC/LaserData system and details the tests and evaluations that were performed under an environment similar to that which would be encountered at the sponsor's site. The prototype optical disk system that was tested and evaluated consists of two stations: a master scanning station for scanning, indexing, and storing of documents onto master and distribution disks and retrieval station for retrieving and displaying information contained on the distribution disks. The master scanning station includes a 386 Central Processing Unit (CPU), a high-speed scanner, and a dual 5.25-inch optical disk drive and is capable of being networked. The retrieval station, intended mainly for viewing documents, does not have a scanner and has only one optical disk drive.

  16. Cost analysis of paint-waste-incineration technology at U. S. Army depots. Final report, Nov 88-Oct 91

    SciTech Connect (OSTI)

    Hall, F.D.; McKibben, R.S.

    1991-10-01

    The U.S. Army Depot System Command (DESCOM) has 16 maintenance depots located throughout the U.S. Several army depots generate paint wastes that must be disposed of. These depots are located in different parts of the country, and a comprehensive strategy is required to manage the disposal of the paint wastes generated at the individual depots. Incineration is a candidate technology for disposal of such wastes. This report presents an economic analysis of developing an incineration strategy. The economic analysis of paint waste incineration was limited to six major maintenance depots: Anniston, Corpus Christi, Letterkenny, Red River, Tobyhanna, and Tooele. These particular depots are included in the analysis because they are responsible for the majority of all paint wastes generated annually be DESCOM. Three scenarios were evaluated: (1) locating an incinerator at each depot, (2) locating an incinerator at a single site and transporting waste from other depots to this location, and (3) using multiple units at two or more depots. The analysis considers the locations of the army depots, the types and quantities of the wastes they generate, and transportation of the wastes. It also assumes that the individual army depots are equally equipped for proper management of the paint waste by the incineration technology and that the waste can be transferred between the depots without any restrictions. It is further assumed that only incinerable paint wastes will be treated.

  17. Evaluate and characterize mechanisms controlling transport, fate, and effects of army smokes in the aerosol wind tunnel: Transport, transformations, fate, and terrestrial ecological effects of hexachloroethane obscurant smokes

    SciTech Connect (OSTI)

    Cataldo, D.A.; Ligotke, M.W.; Bolton, H. Jr.; Fellows, R.J.; Van Voris, P.; McVeety, B.D.; Li, Shu-mei W.; McFadden, K.M.

    1989-09-01

    The terrestrial transport, chemical fate, and ecological effects of hexachloroethane (HC) smoke were evaluated under controlled wind tunnel conditions. The primary objectives of this research program are to characterize and assess the impacts of smoke and obscurants on: (1) natural vegetation characteristic of US Army training sites in the United States; (2) physical and chemical properties of soils representative of these training sites; and (3) soil microbiological and invertebrate communities. Impacts and dose/responses were evaluated based on exposure scenarios, including exposure duration, exposure rate, and sequential cumulative dosing. Key to understanding the environmental impacts of HC smoke/obscurants is establishing the importance of environmental parameters such as relative humidity and wind speed on airborne aerosol characteristics and deposition to receptor surfaces. Direct and indirect biotic effects were evaluated using five plant species and two soil types. HC aerosols were generated in a controlled atmosphere wind tunnel by combustion of hexachloroethane mixtures prepared to simulate normal pot burn rates and conditions. The aerosol was characterized and used to expose plant, soil, and other test systems. Particle sizes of airborne HC ranged from 1.3 to 2.1 {mu}m mass median aerodynamic diameter (MMAD), and particle size was affected by relative humidity over a range of 20% to 85%. Air concentrations employed ranged from 130 to 680 mg/m{sup 3}, depending on exposure scenario. Chlorocarbon concentrations within smokes, deposition rates for plant and soil surfaces, and persistence were determined. The fate of principal inorganic species (Zn, Al, and Cl) in a range of soils was assessed.

  18. Evaluation of Statistical Methodologies Used in U. S. Army Ordnance and Explosive Work

    SciTech Connect (OSTI)

    Ostrouchov, G

    2000-02-14

    Oak Ridge National Laboratory was tasked by the U.S. Army Engineering and Support Center (Huntsville, AL) to evaluate the mathematical basis of existing software tools used to assist the Army with the characterization of sites potentially contaminated with unexploded ordnance (UXO). These software tools are collectively known as SiteStats/GridStats. The first purpose of the software is to guide sampling of underground anomalies to estimate a site's UXO density. The second purpose is to delineate areas of homogeneous UXO density that can be used in the formulation of response actions. It was found that SiteStats/GridStats does adequately guide the sampling so that the UXO density estimator for a sector is unbiased. However, the software's techniques for delineation of homogeneous areas perform less well than visual inspection, which is frequently used to override the software in the overall sectorization methodology. The main problems with the software lie in the criteria used to detect nonhomogeneity and those used to recommend the number of homogeneous subareas. SiteStats/GridStats is not a decision-making tool in the classical sense. Although it does provide information to decision makers, it does not require a decision based on that information. SiteStats/GridStats provides information that is supplemented by visual inspections, land-use plans, and risk estimates prior to making any decisions. Although the sector UXO density estimator is unbiased regardless of UXO density variation within a sector, its variability increases with increased sector density variation. For this reason, the current practice of visual inspection of individual sampled grid densities (as provided by Site-Stats/GridStats) is necessary to ensure approximate homogeneity, particularly at sites with medium to high UXO density. Together with Site-Stats/GridStats override capabilities, this provides a sufficient mechanism for homogeneous sectorization and thus yields representative UXO density

  19. US Army facility for the consolidation of low-level radioactive waste

    SciTech Connect (OSTI)

    Stein, S.L.; Tanner, J.E.; Murphy, B.L.; Gillings, J.C.; Hadley, R.T.; Lyso, O.M.; Gilchrist, R.L.; Murphy, D.W.

    1983-12-01

    A preliminary study of a waste consolidation facility for the Department of the Army's low-level radioactive waste was carried out to determine a possible site and perform a cost-benefit analysis. Four sites were assessed as possible locations for such a facility, using predetermined site selection criteria. To assist in the selection of a site, an evaluation of environmental issues was included as part of each site review. In addition, a preliminary design for a waste consolidation facility was developed, and facilities at each site were reviewed for their availability and suitability for this purpose. Currently available processes for volume reduction, as well as processes still under development, were then investigated, and the support and handling equipment and the staff needed for the safe operation of a waste consolidation facility were studied. Using current costs for the transportation and burial of low-level waste, a cost comparison was then made between waste disposal with and without the utilization of volume reduction. Finally, regulations that could affect the operation of a waste consolidation facility were identified and their impact was assessed. 11 references, 5 figures, 16 tables.

  20. Technical Assessment for the CPC FD-7x-1500 Wind Turbine located at Tooele Army Base, Tooele Utah

    SciTech Connect (OSTI)

    Robert J. Turk; Kurt S. Myers; Jason W. Bush

    2012-08-01

    The CPC FD-7x-1500 Wind Turbine was installed with funding from the Energy Conservation Investment Program (ECIP). Since its installation, the turbine has been plagued with multiple operational upsets causing unacceptable down time. In an effort to reduce down time, the Army Corps of Engineers requested the Idaho National Laboratory conduct an assessment of the turbine to determine its viability as an operational turbine.

  1. Automation impact study of Army training management 2: Extension of sampling and collection of installation resource data

    SciTech Connect (OSTI)

    Sanquist, T.F.; McCallum, M.C.; Hunt, P.S.; Slavich, A.L.; Underwood, J.A.; Toquam, J.L.; Seaver, D.A.

    1989-05-01

    This automation impact study of Army training management (TM) was performed for the Army Development and Employment Agency (ADEA) and the Combined Arms Training Activity (CATA) by the Battelle Human Affairs Research Centers and the Pacific Northwest Laboratory. The primary objective of the study was to provide the Army with information concerning the potential costs and savings associated with automating the TM process. This study expands the sample of units surveyed in Phase I of the automation impact effort (Sanquist et al., 1988), and presents data concerning installation resource management in relation to TM. The structured interview employed in Phase I was adapted to a self-administered survey. The data collected were compatible with that of Phase I, and both were combined for analysis. Three US sites, one reserve division, one National Guard division, and one unit in the active component outside the continental US (OCONUS) (referred to in this report as forward deployed) were surveyed. The total sample size was 459, of which 337 respondents contributed the most detailed data. 20 figs., 62 tabs.

  2. Evaluate and characterize mechanisms controlling transport, fate and effects of army smokes in an aerosol wind tunnel: Transport, transformations, fate and terrestrial ecological effects of fog oil obscurant smokes: Final report

    SciTech Connect (OSTI)

    Cataldo, D.A.; Van Voris, P.; Ligotke, M.W.; Fellows, R.J.; McVeety, B.D.; Li, Shu-mei W.; Bolton, H. Jr.; Fredrickson, J.K.

    1989-01-01

    The terrestrial transport, chemical fate, and ecological effects of fog oil (FO) smoke obscurants were evaluated under controlled wind tunnel conditions. The primary objectives of this research program are to characterize and assess the impacts of smoke and obscurants on: (1) natural vegetation characteristic of US Army training sites in the United States; (2) physical and chemical properties of soils representative of these training sites; and (3) soil microbiological and invertebrate communities. Impacts and dose/responses were evaluated based on an exposure scenario, including exposure duration, exposure rate, and sequential cumulative dosing. Key to understanding the environmental impacts of fog oil smoke/obscurants is establishing the importance of environmental parameters, such as relative humidity and wind speed on airborne aerosol characteristics and deposition to receptor surfaces. Direct and indirect biotic effects were evaluated using five plant species and three soil types. 29 refs., 35 figs., 32 tabs.

  3. Engineering test report: paint waste reduction fluidized-bed process demonstration at Letterkenny Army Depot Chambersburg, Pennsylvania. Final report, May 90-Jul 91

    SciTech Connect (OSTI)

    Murphy, J.P.; Parker, D.

    1991-07-01

    Degreasing and removal of paint from metal parts are processes performed at several Army depots across the country as part of vehicle and equipment rebuilding operations. These processes generate many tons of hazardous waste and release some hazardous materials into the workplace because most of them incorporate toxic chlorinated solvents or caustic soda. These substances also produce sludges that are classified as hazardous waste. U.S. Army Depot Support Command (DESCOM), as part of its hazardous waste minimization program, has established as a goal the elimination of hazardous waste generation from paint stripping operations. Through specific research and development projects, the U.S. Army's Toxic and Hazardous Materials Agency (USATHAMA) assists Army Depots in developing and evaluating methods for minimizing the quantities of hazardous wastes that they generate.

  4. American Recovery and Reinvestment Act, Federal Energy Management Program, Technical Assistance Project 228 - US Army Installation Management Command - Pacific Region, Honolulu, Hawaii

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-09-30

    This report documents the activities of a resource efficiency manager that served the US Army Installation Management Command - Pacific Region during the period November 23, 2009 and August 31, 2010.

  5. A brief history of the T Plant facility at the Hanford Site. Addendum 1

    SciTech Connect (OSTI)

    Gerber, M.S.

    1994-05-16

    T Plant (221-T) was the first and largest of the early chemical separations plants at the Hanford Engineer Works (HEW) (World War II name for the Hanford Site). Officially designated as a Cell Building by the Manhattan Engineer District (MED) of the Army Corps of Engineers (agency responsible for HEW), T Plant served as the headquarters of chemical processing operations at Hanford from its construction until the opening of the REDOX Plant in January 1952. Because it formed a crucial link in the first full-scale plutonium production operations in world history, it meets criteria established in the National Historic Preservation Act of 1966 as a National Historic Structure.

  6. DOE - Office of Legacy Management -- Middlesex Sampling Plant - NJ 04

    Office of Legacy Management (LM)

    Sampling Plant - NJ 04 FUSRAP Considered Sites Middlesex Sampling Plant, NJ Alternate Name(s): None Location: Mountain Avenue, Middlesex, New Jersey NJ.04-2 Historical Operations: Processed and stored domestic and foreign ores containing uranium, thorium, and berryllium. NJ.04-4 NJ.04-5 Eligibility Determination: Eligible NJ.04-1 Radiological Survey(s): Assessment Surveys NJ.04-6 NJ.04-7 NJ.04-8 NJ.04-9 NJ.04-10 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NJ.04-11 NJ.04-12

  7. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  8. Introduction Yucca Lady, a World War II Boeing-17G Flying Fortress Army Air Force serial number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Yucca Lady, a World War II Boeing-17G Flying Fortress Army Air Force serial number 44-83575, was flown to the Nevada Test Site (now known as the Nevada National Security Site - NNSS) in 1952, where she was instrumented and subjected to three atmospheric nuclear tests as part of the Operation Tumbler-Snapper -- Vulnerability of Parked Aircraft to Atomic Bombs series, conducted in April and May 1952. The project would determine the effects of a nuclear device detonated above an airfield,

  9. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  10. Preliminary assessment report for Wayland Army National Guard Armory (former Boston Defense Area Nike Battery 73), Installation 23295, Wayland, Massachusetts. Installation Restoration Program

    SciTech Connect (OSTI)

    Haffenden, R.; Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of preliminary assessment (PA) conducted by Argonne National Laboratory at the Massachusetts Army National Guard property near Wayland, Massachusetts. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in respond to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining sites activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Wayland Army National Guard Army property, Phase I of the Department of Defense Installation Restoration Program.

  11. DOE - Office of Legacy Management -- Sylvania Corning Plant - NY 19

    Office of Legacy Management (LM)

    Plant - NY 19 FUSRAP Considered Sites Sylvania-Corning, NY Alternate Name(s): Sylvania Electric Products, Inc. Sylvania Corp. NY.19-1 NY.19-4 Location: Cantiaque Road, Hicksville, Long Island, New York NY.19-5 Historical Operations: Pilot-scale production of powdered metal uranium slugs for AEC's Hanford reactor. NY.19-4 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.19-3 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. USACE Website Long-term

  12. Evaluation of the utilities energy monitoring and control system installed at the US Army, Europe, Pirmasens and 97th Base Support Battalion, Germany

    SciTech Connect (OSTI)

    Broders, M.A.; McConnell, B.W.

    1992-01-01

    Authorized under an interagency agreements between the US Department of Energy and the US Army, evaluation of the utilities energy monitoring and control system (UEMCSs) operating at selected US Army installations in Heidelberg, Goeppingen, Pirmasens, and Baumholder, Germany, is nearing completion. This report specifically presents the results of the evaluation of the UEMCS installed at USAREUR, 21st Theater Army Area Command (TAACOM), Pirmasens and 97th Base Support Battalion, which is operated by the Directorate of Engineering and Housing (DEH) Utilities Division. The Oak Ridge National Laboratory (ORNL) was selected by Headquarters, USAREUR, Facilities Engineering Division, Utilities and Energy Branch in Heidelberg to evaluated the overall effectiveness and energy efficiency of UEMCSs at four US Army installations in Germany. The third of these systems to be evaluated, which is the scope of this report, is the UEMCS installed at Pirmasens. This evaluation relies upon existing data and information and does not involve introducing metering and instrumentation for the purpose of measuring installation energy use. The primary purpose of this evaluation is to take an in-depth look at the overall performance and effectiveness of the UEMCS installed at Pirmasens to see if it is achieving its operational objectives by resulting in energy and cost savings.

  13. Seeking solutions for icing at dams and hydro plants

    SciTech Connect (OSTI)

    Haynes, F.D. )

    1993-12-01

    Hydroelectric plant operators in the northern US and Canada often encounter icing problems that interfere with normal operations. Icing can cause problems in machinery, valves, and gates, and frazil ice can block water intakes. (Frazil ice is a slightly super-cooled, slush-type ice commonly formed on northern rivers in a rapids area or any area without an ice cover.) Icing problems, especially blockage of water intakes, can shut down a hydropower plant and cause a considerable loss of power generation. The US Army Corps of Engineers' Cold Regions Research and Engineering Laboratory (CRREL) surveyed hydro plant operators about icing problems experienced at their facilities and solutions to these problems. By sharing the survey results, CRREL researchers hope to spread solutions among operators and to identify those problems for which no solutions are currently known that require more research. CRREL researchers also are developing promising technology that may help to alleviate icing problems.

  14. Application of expert systems for diagnosing equipment failures at central energy plants. Final report

    SciTech Connect (OSTI)

    Moshage, R.; Kantamneni, M.; Schanche, G.; Metea, M.; Blazek, C.

    1993-12-01

    The growing cost of operating and maintaining its central heating plants (CHPs) has forced the Army to seek alternatives to traditional methods of running these facilities. Computer technology offers the potential to automate and assist in many tasks, such as in the diagnosis of equipment malfunctions and failures in Army CHPs. An automated diagnostic tool for heating plant equipment could lower the cost of human labor by freeing personnel for higher priority work. Automatic diagnosis of problems could also reduce downtime for repair, promote thermal efficiency, and improve on-line reliability. Researchers at the U.S. Army Construction Engineering Research Laboratories (USACERL) investigated the application of artificial intelligence (AI) using knowledge-based expert systems to the monitoring and diagnosing of CHP boiler operations. A prototype system (MAD) was developed to Monitor And Diagnose boiler failure or identify inefficient operation, and recommend action to optimize combustion efficiency. The system includes a knowledge base containing rules for diagnosing the condition of major package boiler components. Minimum system requirements for MAD are an IBM-compatible AT-class personal computer (PC) with 640K base memory and 1 megabyte extended memory, 1.5 megabytes of free hard drive space, a color graphics adaptor (CGA), and DOS 3.0 (or higher).

  15. Optimizing Dam Operations for Power and for Fish: an Overview of the US Department of Energy and US Army Corps of Engineers ADvanced Turbine Development R&D. A Pre-Conference Workshop at HydroVision 2006, Oregon Convention Center, Portland, Oregon July 31, 2006

    SciTech Connect (OSTI)

    Dauble, Dennis D.

    2006-08-01

    This booklet contains abstracts of presentations made at a preconference workshop on the US Department of Energy and US Army Corps of Engineers hydroturbine programs. The workshop was held in conjunction with Hydrovision 2006 July 31, 2006 at the Oregon Convention Center in Portland Oregon. The workshop was organized by the Corps of Engineers, PNNL, and the DOE Wind and Hydropower Program. Presenters gave overviews of the Corps' Turbine Survival Program and the history of the DOE Advanced Turbine Development Program. They also spoke on physical hydraulic models, biocriteria for safe fish passage, pressure investigations using the Sensor Fish Device, blade strike models, optimization of power plant operations, bioindex testing of turbine performance, approaches to measuring fish survival, a systems view of turbine performance, and the Turbine Survival Program design approach.

  16. Bagdad Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bagdad Plant 585 Silicon Drive Leechburg, P A 15656 * ATI Allegheny "'I Ludlum e-mail: Raymond.Polinski@ATImetals.com Mr. James Raba U.S. Department of Energy Office of Energy ...

  17. Innovative Regulatory and Technical Approaches for the U.S. Army Corp of Engineers' Linde FUSRAP Site Remediation

    SciTech Connect (OSTI)

    Pitts, J. T.; Coutts, P. W.; Franz, J.; Boyle, J. D.; Rogers, B. C.

    2002-02-27

    The U.S. Department of Energy (USDOE) created the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 to identify, investigate, and cleanup or control radiological contamination at sites used by the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) from the 1940s through the 1960s. The USDOE had identified 46 sites in the program and finished remediation at 24 of the smaller ones before the end of 1997. With the passage of the Energy and Water Resources Appropriation Act of 1998 the United States Army Corps of Engineers (USACE) was designated by Congress with responsibility to manage and execute the FUSRAP. The Linde Site located in Tonawanda, New York was operated by the MED from 1942-1946 to extract uranium from several high-grade ores. This natural uranium was subsequently enriched in U-235 elsewhere in the United States and ultimately used to produce energy or weapons. Though in the process of reviewing alternative disposal options by 1995, the USDOE had operated FUSRAP with a strategy requiring virtually all materials remediated be disposed of at only one Nuclear Regulatory Commission licensed facility. The change in management of the FUSRAP in 1997 allowed the disposal policy of low levels of radioactively contaminated materials found at the remaining sites to be reexamined. This paper presents some of the innovative regulatory and technical approaches employed at the Linde Site that are resulting in project cost savings while meeting applicable or relevant and appropriate requirements as well as fulfilling commitments made to the local community.

  18. Reassessment of liquefaction potential and estimation of earthquake- induced settlements at Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Yule, D.E.

    1996-04-01

    This report documents a reassessment of liquefaction potential and estimation of earthquake-induced settlements for the U.S. Department of Energy (DOE), Paducah Gaseous Diffusion Plant (PGDP), located southwest of Paducah, KY. The U.S. Army Engineer Waterways Experiment Station (WES) was authorized to conduct this study from FY91 to FY94 by the DOE, Oak Ridge Operations (ORO), Oak Ridge, TN, through Inter- Agency Agreement (IAG) No. DE-AI05-91OR21971. The study was conducted under the Gaseous Diffusion Plant Safety Analysis Report (GDP SAR) Program.

  19. US Army Corps

    Office of Legacy Management (LM)

    ... at a CERCLA site, address problems or situations sufficiently similar to ... the extent applicable, such as the Emergency Planning and Community Right to Know Act of ...

  20. Smokes and obscurants: A health and environmental effects data base assessment: A first-order, environmental screening and ranking of Army smokes and obscurants: Phase 1 report

    SciTech Connect (OSTI)

    Shinn, J.H.; Martins, S.A.; Cederwall, P.L.; Gratt, L.B.

    1985-03-01

    An initial environmental screening and ranking is provided for each Army smoke and obscurant (S and O) depending on smoke type and smoke-generating device. This was done according to the magnitude of the impact area, the characteristic environmental concentration, the relative inhalation toxicity, the relative toxicity when ingested by animals, the aquatic toxicity, the environmental mobility when freshly deposited, and the ultimate mobility and fate in the environment. The major smoke types considered were various forms of white phosphorus (WP), red phosphorus (RP), hexachloroethane-derived smokes (HC), fog oil (SGF-2), diesel fuel smokes (DF), and some infrared obscuring agents (IR).

  1. Evaluation of solidification/stabilization for treatment of a petroleum hydrocarbon contaminated sludge from Fort Polk Army Installation, Louisiana. Final report

    SciTech Connect (OSTI)

    Channell, M.G.; Preston, K.T.

    1996-09-01

    In the course of normal operations and training, soldiers and civilian personnel operate many Army vehicles on a day-today basis. These vehicles must be cleaned before they can be returned to the motor pool area of an Army base. The cleaning of these vehicles bas posed a problem with the operation and maintenance of oil/water separators located at vehicle washrack facilities. An oily sludge forms in the oil/water separator and is hard to handle and cannot be disposed of in an ordinary manner. This study used solidification/stabilization to treat the oily sludge found in the vehicle washrack oil/water separators. Solidification/stabilization is usually used to treat soils and sludges that contain heavy metals. Organic compounds, such as petroleum hydrocarbons found in the sludge, interfere with the setting of the solidification binding materials and thus produce a material that is not desirable for a treatment alternative. This study incorporates the use of dicalcium silicate as an additive to the solidification process to increase the strength and reduce the leachability of the petroleum hydrocarbons found in the sludge. This study shows that dicalcium silicate improves the handling characteristics of the sludge and reduces the leachability of the contaminants from the washrack sludge.

  2. Nutritional status and random blood glucose, cholesterol and triglyceride test among Malaysian Army (MA) personnel in Kuala Lumpur

    SciTech Connect (OSTI)

    Nadiy, I.; Razalee, S.; Zalifah, M. K.; Zulkeffeli, M. J.

    2013-11-27

    With the rising trend of obesity among the general population, it is also important to assess the obesity and health status among military population. The aim of this study was to determine the prevalence of overweight and obesity among Malaysian Army (MA) personnel as well as the relationship between selected socio-demographics factors, antropometric profiles, body composition and random blood test value. A cross sectional study involving 378 male military personnel aged between 20 to 48 years old was conducted at two MA bases in Kuala Lumpur between November and December 2012. Antropometric measurements included height, weight and waist circumference (WC). Body fat percentage was measured using bioelectrical impedance analysis method (Tanita TBF-300A). Mean height, weight, BMI, WC, body fat percentage, age, monthly income and duration of service were 1.71 ± 0.6 m, 71.7 ± 12.2 kg, 24.6 ± 4.1 kg/m{sup 2}, 87.0 ± 10.0 cm, 23.4 ± 6.6%, 29.1 ± 5.5 years, RM 2115.12 ± 860.70 and 9.9 ± 5.6 years respectively. According to WHO (1998) classification of BMI, 3.2% of the subjects were underweight, 54.8% normal, 32.8% overweight and 9.3% obese. It was obeserved that 40.2% of the subjects had waist circumference value of 90 cm or more and were considered high risk for diebetes and cardiovascular diseases. This study found that BMI was highly correlated with weight (r=0.925, p<0.05), WC (r=0.852, p<0.05) and body fat percentage. Body fat percentage also show high correlation with weight (r=0.759, p<0.05) and WC (r=0.768, p<0.05. The result from 173 of 378 subjects that were selected for random blood test found that 4.6%, 3.5% and 26.0% had diabetes, high cholesterol and high triglyceride respectively. There was a weak correlation between random blood glucose level with weight (r=0.221, p<0.05), BMI (r=0.243, p<0.05), WC (r=0.298, p<0.05), body fat percentage (r=0.163, p<0.05) and age (r=0.223, p<0.05). Random blood cholesterol level had significant correlation with

  3. Prescott Airport Solar Plant Solar Power Plant | Open Energy...

    Open Energy Info (EERE)

    Prescott Airport Solar Plant Solar Power Plant Jump to: navigation, search Name Prescott Airport Solar Plant Solar Power Plant Facility Prescott Airport Solar Plant Sector Solar...

  4. Deming Solar Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Deming Solar Plant Solar Power Plant Jump to: navigation, search Name Deming Solar Plant Solar Power Plant Facility Deming Solar Plant Sector Solar Facility Type Photovoltaic...

  5. Solana Generating Plant Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Solana Generating Plant Solar Power Plant Jump to: navigation, search Name Solana Generating Plant Solar Power Plant Facility Solana Generating Plant Sector Solar Facility Type...

  6. Better Plants

    Broader source: Energy.gov [DOE]

    Leading manufacturers and industrial-scale energy-using organizations demonstrate their commitment to improving energy performance by signing a voluntary pledge to reduce their energy intensity by 25% over a ten year period. The U.S. Department of Energys Better Buildings, Better Plants Program is an important partnership which consists of approximately 150 industrial companies, representing about 2,300 facilities and close to 11% of the total U.S. manufacturing energy footprint as well as several water and wastewater treatment organizations.

  7. Proceedings: Special session on the rehabilitation of US Army Training Lands, Second Annual Conference of the Society for Ecological Restoration, held in Chicago, Illinois, April 29--May 3, 1990

    SciTech Connect (OSTI)

    Hinchman, R.R.

    1993-05-01

    US Army lands are currently being degraded at a rate that often exceeds natural resource conservation goals. The US Army Construction Engineering Research Laboratories is developing and implementing the Integrated Training Area Management (ITAM) program at several installations in the United States and Germany to reverse the rate of degradation and maintain realistic training habitat. The ITAM program includes environmental education/awareness tools, revegetation and erosion-control technologies, standardized land-monitoring methodologies, and computerized land-management decision-support systems that are integrated with military training mission requirements to provide a long-term, land-management program.

  8. An examination of electronic file transfer between host and microcomputers for the AMPMODNET/AIMNET (Army Material Plan Modernization Network/Acquisition Information Management Network) classified network environment

    SciTech Connect (OSTI)

    Hake, K.A.

    1990-11-01

    This report presents the results of investigation and testing conducted by Oak Ridge National Laboratory (ORNL) for the Project Manager -- Acquisition Information Management (PM-AIM), and the United States Army Materiel Command Headquarters (HQ-AMC). It concerns the establishment of file transfer capabilities on the Army Materiel Plan Modernization (AMPMOD) classified computer system. The discussion provides a general context for micro-to-mainframe connectivity and focuses specifically upon two possible solutions for file transfer capabilities. The second section of this report contains a statement of the problem to be examined, a brief description of the institutional setting of the investigation, and a concise declaration of purpose. The third section lays a conceptual foundation for micro-to-mainframe connectivity and provides a more detailed description of the AMPMOD computing environment. It gives emphasis to the generalized International Business Machines, Inc. (IBM) standard of connectivity because of the predominance of this vendor in the AMPMOD computing environment. The fourth section discusses two test cases as possible solutions for file transfer. The first solution used is the IBM 3270 Control Program telecommunications and terminal emulation software. A version of this software was available on all the IBM Tempest Personal Computer 3s. The second solution used is Distributed Office Support System host electronic mail software with Personal Services/Personal Computer microcomputer e-mail software running with IBM 3270 Workstation Program for terminal emulation. Test conditions and results are presented for both test cases. The fifth section provides a summary of findings for the two possible solutions tested for AMPMOD file transfer. The report concludes with observations on current AMPMOD understanding of file transfer and includes recommendations for future consideration by the sponsor.

  9. Plant-based Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant-based Materials Catalysis Center for Energy Innovation teams with consumer goods and ... announced a research program with the Plant PET Technology Collaborative (PTC) to ...

  10. Site-specific earthquake response analysis for Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect (OSTI)

    Sykora, D.W.; Davis, J.J.

    1993-08-01

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the US Department of Energy (DOE) and operated under contract by Martin Marietta Energy systems, Inc., is located southwest of Paducah, Kentucky. An aerial photograph and an oblique sketch of the plant are shown in Figures 1 and 2, respectively. The fenced portion of the plant consists of 748 acres. This plant was constructed in the 1950`s and is one of only two gaseous diffusion plants in operation in the United States; the other is located near Portsmouth, Ohio. The facilities at PGDP are currently being evaluated for safety in response to natural seismic hazards. Design and evaluation guidelines to evaluate the effects of earthquakes and other natural hazards on DOE facilities follow probabilistic hazard models that have been outlined by Kennedy et al. (1990). Criteria also established by Kennedy et al. (1990) classify diffusion plants as ``moderate hazard`` facilities. The US Army Engineer Waterways Experiment Station (WES) was tasked to calculate the site response using site-specific design earthquake records developed by others and the results of previous geotechnical investigations. In all, six earthquake records at three hazard levels and four individual and one average soil columns were used.

  11. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.

  12. Formerly Utilized Sites Remedial Action Program Fact Sheet

    Broader source: Energy.gov (indexed) [DOE]

    Ammunition Plant Seaway Industrial Park Linde Air Products Tonawanda Landfill Niagara Falls Storage Site Guterl Specialty Steel Colonie Shallow Land Disposal Area Shpack...

  13. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant AFFIDAVIT FOR SURVIVING RELATIVE STATE ) ) ss: COUNTY OF ) That I, , am the...

  14. Ethylene insensitive plants

    DOE Patents [OSTI]

    Ecker, Joseph R.; Nehring, Ramlah; McGrath, Robert B.

    2007-05-22

    Nucleic acid and polypeptide sequences are described which relate to an EIN6 gene, a gene involved in the plant ethylene response. Plant transformation vectors and transgenic plants are described which display an altered ethylene-dependent phenotype due to altered expression of EIN6 in transformed plants.

  15. Polyhydroxyalkanoate synthesis in plants

    DOE Patents [OSTI]

    Srienc, Friedrich; Somers, David A.; Hahn, J. J.; Eschenlauer, Arthur C.

    2000-01-01

    Novel transgenic plants and plant cells are capable of biosynthesis of polyhydroxyalkanoate (PHA). Heterologous enzymes involved in PHA biosynthesis, particularly PHA polymerase, are targeted to the peroxisome of a transgenic plant. Transgenic plant materials that biosynthesize short chain length monomer PHAs in the absence of heterologous .beta.-ketothiolase and acetoacetyl-CoA reductase are also disclosed.

  16. Baseline risk assessment for groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-14

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are evaluating conditions in groundwater and springs at the DOE chemical plant area and the DA ordnance works area near Weldon Spring, Missouri. The two areas are located in St. Charles County, about 48 km (30 mi) west of St. Louis. The 88-ha (217-acre) chemical plant area is chemically and radioactively contaminated as a result of uranium-processing activities conducted by the U.S. Atomic Energy Commission in the 1950s and 1960s and explosives-production activities conducted by the U.S. Army (Army) in the 1940s. The 6,974-ha (17,232-acre) ordnance works area is primarily chemically contaminated as a result of trinitrotoluene (TNT) and dinitrotoluene (DNT) manufacturing activities during World War II. This baseline risk assessment (BRA) is being conducted as part of the remedial investigation/feasibility study (RUFS) required under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. The purpose of the BRA is to evaluate potential human health and ecological impacts from contamination associated with the groundwater operable units (GWOUs) of the chemical plant area and ordnance works area. An RI/FS work plan issued jointly in 1995 by the DOE and DA (DOE 1995) analyzed existing conditions at the GWOUs. The work plan included a conceptual hydrogeological model based on data available when the report was prepared; this model indicated that the aquifer of concern is common to both areas. Hence, to optimize further data collection and interpretation efforts, the DOE and DA have decided to conduct a joint RI/BRA. Characterization data obtained from the chemical plant area wells indicate that uranium is present at levels slightly higher than background, with a few concentrations exceeding the proposed U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) of 20 {micro}g/L (EPA 1996c). Concentrations of other radionuclides (e

  17. Waste Treatment Plant Overview

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is

  18. Plant fatty acid hydroxylases

    DOE Patents [OSTI]

    Somerville, Chris; Broun, Pierre; van de Loo, Frank

    2001-01-01

    This invention relates to plant fatty acyl hydroxylases. Methods to use conserved amino acid or nucleotide sequences to obtain plant fatty acyl hydroxylases are described. Also described is the use of cDNA clones encoding a plant hydroxylase to produce a family of hydroxylated fatty acids in transgenic plants. In addition, the use of genes encoding fatty acid hydroxylases or desaturases to alter the level of lipid fatty acid unsaturation in transgenic plants is described.

  19. Effects of military-authorized activities on the San Joaquin kit fox (Vulpes velox macrotis) at Camp Roberts Army National Guard Training Site, California

    SciTech Connect (OSTI)

    Berry, W.H.; Standley, W.G.; O`Farrell, T.P.; Kato, T.T.

    1992-10-01

    The effects of military-authorized activities on San Joaquin kit fox (Vulpes velox macrotis) were investigated at Camp Roberts Army National Guard Training Site from 1988 to 1991. Military-authorized activities included military training exercises, facilities maintenance, new construction, controlled burning, livestock grazing, and public-access hunting. Positive effects of the military included habitat preservation, preactivity surveys, and natural resources management practices designed to conserve kit foxes and their habitat. Perceived negative effects such as entrapment in dens, shootings during military exercises, and accidental poisoning were not observed. Foxes were observed in areas being used simultaneously by military units. Authorized activities were known to have caused the deaths of three of 52 radiocollared foxes recovered dead: one became entangled in concertina wire, one was believed shot by a hunter, and one was struck by a vehicle. Entanglement in communication wire may have contributed to the death of another radiocollared fox that was killed by a predator. Approximately 10% of kit fox dens encountered showed evidence of vehicle traffic, but denning sites did not appear to be a limiting factor for kit foxes.

  20. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

  1. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

  2. Plant Phenotype Characterization System

    SciTech Connect (OSTI)

    Daniel W McDonald; Ronald B Michaels

    2005-09-09

    This report is the final scientific report for the DOE Inventions and Innovations Project: Plant Phenotype Characterization System, DE-FG36-04GO14334. The period of performance was September 30, 2004 through July 15, 2005. The project objective is to demonstrate the viability of a new scientific instrument concept for the study of plant root systems. The root systems of plants are thought to be important in plant yield and thus important to DOE goals in renewable energy sources. The scientific study and understanding of plant root systems is hampered by the difficulty in observing root activity and the inadequacy of existing root study instrumentation options. We have demonstrated a high throughput, non-invasive, high resolution technique for visualizing plant root systems in-situ. Our approach is based upon low-energy x-ray radiography and the use of containers and substrates (artificial soil) which are virtually transparent to x-rays. The system allows us to germinate and grow plant specimens in our containers and substrates and to generate x-ray images of the developing root system over time. The same plant can be imaged at different times in its development. The system can be used for root studies in plant physiology, plant morphology, plant breeding, plant functional genomics and plant genotype screening.

  3. Plant centromere compositions

    DOE Patents [OSTI]

    Mach; Jennifer M. , Zieler; Helge , Jin; RongGuan , Keith; Kevin , Copenhaver; Gregory P. , Preuss; Daphne

    2011-11-22

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  4. Plant centromere compositions

    DOE Patents [OSTI]

    Mach, Jennifer; Zieler, Helge; Jin, James; Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2007-06-05

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  5. Plant centromere compositions

    DOE Patents [OSTI]

    Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2006-10-10

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  6. Plant centromere compositions

    DOE Patents [OSTI]

    Mach, Jennifer; Zieler, Helge; Jin, James; Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2006-06-26

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  7. Plant centromere compositions

    DOE Patents [OSTI]

    Mach, Jennifer M.; Zieler, Helge; Jin, RongGuan; Keith, Kevin; Copenhaver, Gregory P.; Preuss, Daphne

    2011-08-02

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  8. T Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact ... and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage ...

  9. Plants & Animals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plants & Animals Plants & Animals Plant and animal monitoring is performed to determine whether Laboratory operations are impacting human health via the food chain. February 2, 2015 A rabbit on LANL land. A rabbit on Los Alamos National Laboratory land. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email We sample many plants and animals, including wild and domestic crops, game animals, fish, and food products from

  10. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  11. Virginia Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal ... Electric & Power Co" "2 Plants 4 Reactors","3,501","26,572",100.0 "Note: ...

  12. Better Plants Pre-In-Plant Training Webinars

    Office of Energy Efficiency and Renewable Energy (EERE)

    A listing of Better Plants pre-In-Plant Training webinars on reducing energy in a variety of systems.

  13. DOE - Office of Legacy Management -- Navy Ammunition Depot -...

    Office of Legacy Management (LM)

    Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not ... NJ.15-1 Site Disposition: Eliminated - Referred to DOD NJ.15-2 Radioactive Materials ...

  14. NEMS Modeling of Coal Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Liquid Fuels Market Module Model inputs for coal plants 3 * Existing coal plants - plant specific ... FF - Cost to convert to natural gas-fired steam plant - Cost to implement heat ...

  15. ARMY Opportunities | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    taylor.pdf (113.39 KB) More Documents & Publications Fuel Cells & Alternative Fuels Large-dimension, high-ZT Thermoelectric Nanocomposites for High-Power High-efficiency Waste Heat Recovery for Electricity Generation Large-dimension, high-ZT Thermoelectric Nanocomposites for High-Power High-efficiency Waste Heat Recovery for Electricity Generation

  16. Conditional sterility in plants

    DOE Patents [OSTI]

    Meagher, Richard B.; McKinney, Elizabeth; Kim, Tehryung

    2010-02-23

    The present disclosure provides methods, recombinant DNA molecules, recombinant host cells containing the DNA molecules, and transgenic plant cells, plant tissue and plants which contain and express at least one antisense or interference RNA specific for a thiamine biosynthetic coding sequence or a thiamine binding protein or a thiamine-degrading protein, wherein the RNA or thiamine binding protein is expressed under the regulatory control of a transcription regulatory sequence which directs expression in male and/or female reproductive tissue. These transgenic plants are conditionally sterile; i.e., they are fertile only in the presence of exogenous thiamine. Such plants are especially appropriate for use in the seed industry or in the environment, for example, for use in revegetation of contaminated soils or phytoremediation, especially when those transgenic plants also contain and express one or more chimeric genes which confer resistance to contaminants.

  17. Better Buildings, Better Plants:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings, Better Plants: AMO Technical Assistance Overview Andre de Fontaine This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 | Advanced Manufacturing Office Better Buildings, Better Plants Overview  Better Buildings, Better Plants is a national, voluntary industrial energy efficiency leadership initiative.  It is a key component of the President's Better Buildings Initiative, which seeks to improve the energy efficiency of

  18. Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.

    SciTech Connect (OSTI)

    Brouns, Thomas M.

    2007-07-15

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

  19. SC Johnson Waxdale Plant

    SciTech Connect (OSTI)

    2010-01-01

    This is a combined heat and power (CHP) project profile on a 6.4 MW CHP application at SC Johnson Waxdale Plant in Racine, Wisconsin.

  20. Leatherwood prep plant upgrade

    SciTech Connect (OSTI)

    Hollis, R.W.; Jain, S.M.

    2007-06-15

    The Blue Diamond Coal Co. recently implemented major circuit modifications to the Leatherwood coal preparation plant (formerly known as the J.K. Cornett prep plant) in Slemp, KY, USA. The plant was originally built in the late 1980s, and then modified in 1999. The 2006 plant modifications included: two Krebs 33-inch heavy-media cyclones; five 10 x 20 ft single deck Conn-Weld Banana type vibrating screens; two 10 ft x 48 inch Eriez self-leveling magnetic separators; two Derrick Stacksizer high frequency screens; two CMI EBR-48 centrifugal dryers; Warman process pumps; and eight triple start MDL spiral concentrators. 2 figs.

  1. concentrating solar power plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    power plant - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy ...

  2. Process for Transition of Responsibilities for Formerly Utilized Sites Remedial Action Program Sites from the U.S. Army Corps of Engineers to the U.S. Department of Energy for Long-Term Surveillance and Maintenance

    SciTech Connect (OSTI)

    Clayton, C.; Widdop, M.

    2006-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is the long-term custodian of sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The U.S. Army Corps of Engineers (USACE) is responsible for characterization, assessment, remedy selection, and remedial action of FUSRAP sites. Site responsibilities are transferred from USACE to DOE-LM when the implemented remedy is demonstrated to be functioning as designed. Coordination of site transfer follows prescribed processes to ensure that DOE acquires the knowledge and information to maintain the site remedy and site protectiveness. (authors)

  3. Investigation summary and proposed alternative for lead remediation at a small arms trainfire range

    SciTech Connect (OSTI)

    Beekman, S.M.; Stemper, M.L. [Harding Lawson Associates, Novato, CA (United States)

    1995-12-31

    The small arms trainfire ranges are part of the former Fort Ord Army Base Superfund site in Monterey County, California. Trainees fired small caliber weapons at targets near the leeward dune faces along Monterey Bay. Monterey Bay is a National Marine Sanctuary and the dunes contain endangered species and endangered species habitat. This paper summarizes results of the remedial investigation, human health risk assessment, ecological risk assessment, and feasibility study, and presents the results of bench-scale studies and proposed pilot studies for the site. Results of the RI showed that lead is the primary chemical of concern in soil (i.e., dune sands) and was detected at the highest concentrations where surface coverage of spent ammunition was greater than 10 percent (areas of heavy bullet distribution). A regulatory-approved health-based level of 1,860 mg/kg was developed as an acceptable level for lead-bearing soil in areas of heavy deposition to be protective of human health and the environment for planned reuse. Concentrations near or above 1,860 mg/kg correspond to areas of heavy distribution of spent ammunition. Plant and animal species were sampled and tested to evaluate the potential risk to ecological receptors.

  4. Better Plants Program Overview

    SciTech Connect (OSTI)

    2015-09-30

    The U.S. Department of Energy’s (DOE’s) Better Buildings, Better Plants Program is a voluntary partnership initiative to drive significant energy efficiency improvement across energy intensive companies and organizations. 157 leading manufacturers and public water and wastewater treatment utilities are partnering with DOE through Better Plants to improve energy efficiency, slash carbon emissions, and cut energy costs.

  5. Modulating lignin in plants

    DOE Patents [OSTI]

    Apuya, Nestor; Bobzin, Steven Craig; Okamuro, Jack; Zhang, Ke

    2013-01-29

    Materials and methods for modulating (e.g., increasing or decreasing) lignin content in plants are disclosed. For example, nucleic acids encoding lignin-modulating polypeptides are disclosed as well as methods for using such nucleic acids to generate transgenic plants having a modulated lignin content.

  6. Plant pathogen resistance

    SciTech Connect (OSTI)

    Greenberg, Jean T.; Jung, Ho Won; Tschaplinski, Timothy

    2015-10-20

    Azelaic acid or its derivatives or analogs induce a robust and a speedier defense response against pathogens in plants. Azelaic acid treatment alone does not induce many of the known defense-related genes but activates a plant's defense signaling upon pathogen exposure.

  7. Plant growth promoting rhizobacterium

    SciTech Connect (OSTI)

    Doktycz, Mitchel John; Pelletier, Dale A.; Schadt, Christopher Warren; Tuskan, Gerald A.; Weston, David

    2015-08-11

    The present invention is directed to the Pseudomonas fluorescens strain GM30 deposited under ATCC Accession No. PTA-13340, compositions containing the GM30 strain, and methods of using the GM30 strain to enhance plant growth and/or enhance plant resistance to pathogens.

  8. NUCLEAR POWER PLANT

    DOE Patents [OSTI]

    Carter, J.C.; Armstrong, R.H.; Janicke, M.J.

    1963-05-14

    A nuclear power plant for use in an airless environment or other environment in which cooling is difficult is described. The power plant includes a boiling mercury reactor, a mercury--vapor turbine in direct cycle therewith, and a radiator for condensing mercury vapor. (AEC)

  9. Plant pathogen resistance

    DOE Patents [OSTI]

    Greenberg, Jean T; Jung, Ho Won; Tschaplinski, Timothy

    2012-11-27

    Azelaic acid or its derivatives or analogs induce a robust and a speedier defense response against pathogens in plants. Azelaic acid treatment alone does not induce many of the known defense-related genes but activates a plant's defense signaling upon pathogen exposure.

  10. Plant fatty acid hydroxylase

    DOE Patents [OSTI]

    Somerville, Chris; van de Loo, Frank

    2000-01-01

    The present invention relates to the identification of nucleic acid sequences and constructs, and methods related thereto, and the use of these sequences and constructs to produce genetically modified plants for the purpose of altering the composition of plant oils, waxes and related compounds.

  11. Better Plants Program Partners

    Broader source: Energy.gov [DOE]

    DOE recognizes the following companies for their commitment to reducing the energy intensity of their U.S. manufacturing operations by 25% or more within 10 years. These Better Plants Program Partners set ambitious goals, establish energy management plans, and report progress annually to DOE. Click on the arrows below to view Better Plants Program Partner profiles and learn more about their commitment.

  12. FRIB Cryogenic Plant Status

    SciTech Connect (OSTI)

    Dixon, Kelly D.; Ganni, Venkatarao; Knudsen, Peter N.; Casagranda, Fabio

    2015-12-01

    After practical changes were approved to the initial conceptual design of the cryogenic system for MSU FRIB and an agreement was made with JLab in 2012 to lead the design effort of the cryogenic plant, many activities are in place leading toward a cool-down of the linacs prior to 2018. This is mostly due to using similar equipment used at CHLII for the 12 GeV upgrade at JLab and an aggressive schedule maintained by the MSU Conventional Facilities department. Reported here is an updated status of the cryogenic plant, including the equipment procurement status, plant layout, facility equipment and project schedule.

  13. Jack Case ? Tool and die maker to plant manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    drafted into the regular Army at St. Louis, Missouri. As they were going through the induction process, one of the officers processing the paperwork said to Jack, "You are going...

  14. Wisconsin Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Wisconsin nuclear power plants, summer capacity and net generation, 2010" "Plant name..."8,291",62.4,"NextEra Energy Point Beach LLC" "2 Plants 3 Reactors","1,584","13,281",100.0

  15. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel

  16. Desalination Plant Optimization

    Energy Science and Technology Software Center (OSTI)

    1992-10-01

    MSF21 and VTE21 perform design and costing calculations for multistage flash evaporator (MSF) and multieffect vertical tube evaporator (VTE) desalination plants. An optimization capability is available, if desired. The MSF plant consists of a recovery section, reject section, brine heater, and associated buildings and equipment. Operating costs and direct and indirect capital costs for plant, buildings, site, and intakes are calculated. Computations are based on the first and last stages of each section and amore » typical middle recovery stage. As a result, the program runs rapidly but does not give stage by stage parameters. The VTE plant consists of vertical tube effects, multistage flash preheater, condenser, and brine heater and associated buildings and equipment. Design computations are done for each vertical tube effect, but preheater computations are based on the first and last stages and a typical middle stage.« less

  17. B Plant facility description

    SciTech Connect (OSTI)

    Chalk, S.E.

    1996-10-04

    Buildings 225B, 272B, 282B, 282BA, and 294B were removed from the B Plant facility description. Minor corrections were made for tank sizes and hazardous and toxic inventories.

  18. Plant Vascular Biology 2010

    SciTech Connect (OSTI)

    Ding, Biao

    2014-11-17

    This grant supported the Second International Conference on Plant Vascular Biology (PVB 2010) held July 24-28, 2010 on the campus of Ohio State University, Columbus, Ohio. Biao Ding (Ohio State University; OSU) and David Hannapel (Iowa State University; ISU) served as co-chairs of this conference. Biao Ding served as the local organizer. PVB is defined broadly here to include studies on the biogenesis, structure and function of transport systems in plants, under conditions of normal plant growth and development as well as of plant interactions with pathogens. The transport systems cover broadly the xylem, phloem, plasmodesmata and vascular cell membranes. The PVB concept has emerged in recent years to emphasize the integrative nature of the transport systems and approaches to investigate them.

  19. Power Plant Cycling Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Intertek APTECH has organized the cycling cost data in consultation with NREL and WECC by the following eight generator plant types: 1. Small coal-fired sub-critical steam (35-299 ...

  20. Special Better Plants Training Opportunities | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Better Plants Special Better Plants Training Opportunities Special Better Plants Training Opportunities Better Plants process heating training at an ...

  1. Plant Phenotype Characterization System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Phenotype Characterization System Plant Phenotype Characterization System New X-Ray Technology Accelerates Plant Research The ability to analyze plant root structure and...

  2. Better Plants Overview SGH | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Plants Overview SGH 151007.pdf (315.86 KB) More Documents & Publications Better Plants Two-Page Overview Better Plants Progress Update Fall 2013 Better Plants Progress ...

  3. Washington Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Washington nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State ...

  4. Vermont Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  5. Quiz: Know Your Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE)

    Think you know where coal, solar and other power plants are located around the country? Test your knowledge with our power plants quiz!

  6. Connecticut Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  7. Georgia Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  8. California Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    California nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State ...

  9. Pennsylvania Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Pennsylvania nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State ...

  10. Ohio Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Ohio nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  11. Virginia Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  12. Minnesota Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Minnesota nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  13. Alabama Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  14. Wisconsin Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Wisconsin nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  15. Texas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  16. Tennessee Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  17. Illinois Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  18. Michigan Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  19. Nebraska Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Nebraska nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  20. Florida Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Florida nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  1. Maryland Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Calvert Cliffs Nuclear Power Plant ...

  2. Gasification Plant Databases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Databases Welcome to the U. S. Department of Energy, National Energy Technology Laboratory's Gasification Plant Databases Within these databases you will find current publicly available information on proposed projects and projects undergoing construction and initial operation within the United States and worldwide. Currently operating projects are excluded. The data have been compiled here to keep the public informed of the technologies and investments in major industrial coal

  3. Coal Preparation Plant Simulation

    Energy Science and Technology Software Center (OSTI)

    1992-02-25

    COALPREP assesses the degree of cleaning obtained with different coal feeds for a given plant configuration and mode of operation. It allows the user to simulate coal preparation plants to determine an optimum plant configuration for a given degree of cleaning. The user can compare the performance of alternative plant configurations as well as determine the impact of various modes of operation for a proposed configuration. The devices that can be modelled include froth flotationmore » devices, washers, dewatering equipment, thermal dryers, rotary breakers, roll crushers, classifiers, screens, blenders and splitters, and gravity thickeners. The user must specify the plant configuration and operating conditions and a description of the coal feed. COALPREP then determines the flowrates within the plant and a description of each flow stream (i.e. the weight distribution, percent ash, pyritic sulfur and total sulfur, moisture, BTU content, recoveries, and specific gravity of separation). COALPREP also includes a capability for calculating the cleaning cost per ton of coal. The IBM PC version contains two auxiliary programs, DATAPREP and FORLIST. DATAPREP is an interactive preprocessor for creating and editing COALPREP input data. FORLIST converts carriage-control characters in FORTRAN output data to ASCII line-feed (X''0A'') characters.« less

  4. Coal Preparation Plant Simulation

    Energy Science and Technology Software Center (OSTI)

    1992-02-25

    COALPREP assesses the degree of cleaning obtained with different coal feeds for a given plant configuration and mode of operation. It allows the user to simulate coal preparation plants to determine an optimum plant configuration for a given degree of cleaning. The user can compare the performance of alternative plant configurations as well as determine the impact of various modes of operation for a proposed configuration. The devices that can be modelled include froth flotationmore » devices, washers, dewatering equipment, thermal dryers, rotary breakers, roll crushers, classifiers, screens, blenders and splitters, and gravity thickeners. The user must specify the plant configuration and operating conditions and a description of the coal feed. COALPREP then determines the flowrates within the plant and a description of each flow stream (i.e. the weight distribution, percent ash, pyritic sulfur and total sulfur, moisture, BTU content, recoveries, and specific gravity of separation). COALPREP also includes a capability for calculating the cleaning cost per ton of coal.« less

  5. GEOTHERMAL POWER GENERATION PLANT

    SciTech Connect (OSTI)

    Boyd, Tonya

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196oF resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  6. Owners of nuclear power plants

    SciTech Connect (OSTI)

    Wood, R.S.

    1991-07-01

    This report indicates percentage ownership of commercial nuclear power plants by utility companies. The report includes all plants operating, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review, but does not include those plants announced but not yet under review or those plants formally cancelled. Part 1 of the report lists plants alphabetically with their associated applicants or licensees and percentage ownership. Part 2 lists applicants or licensees alphabetically with their associated plants and percentage ownership. Part 1 also indicates which plants have received operating licenses (OLS).

  7. Geothermal Plant Capacity Factors

    SciTech Connect (OSTI)

    Greg Mines; Jay Nathwani; Christopher Richard; Hillary Hanson; Rachel Wood

    2015-01-01

    The capacity factors recently provided by the Energy Information Administration (EIA) indicated this plant performance metric had declined for geothermal power plants since 2008. Though capacity factor is a term commonly used by geothermal stakeholders to express the ability of a plant to produce power, it is a term frequently misunderstood and in some instances incorrectly used. In this paper we discuss how this capacity factor is defined and utilized by the EIA, including discussion on the information that the EIA requests from operations in their 923 and 860 forms that are submitted both monthly and annually by geothermal operators. A discussion is also provided regarding the entities utilizing the information in the EIA reports, and how those entities can misinterpret the data being supplied by the operators. The intent of the paper is to inform the facility operators as the importance of the accuracy of the data that they provide, and the implications of not providing the correct information.

  8. Willow plant name 'Preble'

    DOE Patents [OSTI]

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2014-06-10

    A distinct female cultivar of Salix viminalis.times.(Salix sachalinensis.times.Salix miyabeana) named `Preble`, characterized by rapid stem growth producing 29% more woody biomass than the average of three current production cultivars (Salix.times.dasyclados `SV1` (unpatented), Salix sachalinensis `SX61` (unpatented), and Salix miyabeana `SX64` (unpatented)) when grown in the same field for the same length of time (three growing seasons after coppice) in two different trials in Constableville, N.Y. and Middlebury, Vt. `Preble` can be planted from dormant stem cuttings, produces multiple stems after coppice and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested repeatedly after two to four years of growth. `Preble` displays a low incidence of rust disease and is not damaged by potato leafhoppers.

  9. Owners of nuclear power plants

    SciTech Connect (OSTI)

    Not Available

    1982-11-01

    The list indicates percentage ownership of commercial nuclear power plants by utility companies as of September 1, 1982. The list includes all plants licensed to operate, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review. Part I lists plants alphabetically with their associated applicants and percentage ownership. Part II lists applicants alphabetically with their associated plants and percentage ownership. Part I also indicates which plants have received operating licenses.

  10. Pantex Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pantex Plant Pantex Plant Pantex Plant | September 2010 Aerial View Pantex Plant | September 2010 Aerial View The primary mission of the Pantex Plant is the assembly, disassembly, testing, and evaluation of nuclear weapons in support of the NNSA stockpile stewardship program. Pantex also performs research and development in conventional high explosives and serves as an interim storage site for plutonium pits removed from dismantled weapons. Enforcement April 8, 2015 Enforcement Letter, Packaging

  11. U Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Projects & Facilities U Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  12. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-3542 Site Sustainability Plan Waste Isolation Pilot Plant Fiscal Year 2015 Narrative November 2014 Office of Site Operations Carlsbad Field Office U.S. Department of Energy Approved By: //signature on file// 12/30/14 Jose R. Franco, Date Manager, Carlsbad Field Office Site Sustainability Plan Waste Isolation Pilot Plant, Fiscal Year 2015 Narrative DOE/WIPP-14-3542 Page 2 of 48 TABLE OF CONTENTS I. EXECUTIVE SUMMARY 4 TABLE 1. DOE Goal Summary Table 6 II. PERFORMANCE REVIEW AND PLAN NARRATIVE

  13. B Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H Reactor

  14. Pinellas Plant facts

    SciTech Connect (OSTI)

    1990-11-01

    The Pinellas Plant, near St. Petersburg, Florida, is wholly owned by the United States Government. It is operated for the Department of Energy (DOE) by GE Aerospace, Neutron Devices (GEND). This plant was built in 1956 to manufacture neutron generators, a principal component in nuclear weapons. The neutron generators built at Neutron Devices consist of a miniaturized linear ion accelerator assembled with the pulsed electrical power supplies required for its operation. Production of these devices has necessitated the development of several uniquely specialized areas of competence and supporting facilities. The ion accelerator, or neutron tube, requires ultra clean, high vacuum technology; hermetic seals between glass, ceramic, glass-ceramic, and metal materials; plus high voltage generation and measurement technology. The existence of these capabilities at Neutron Devices has led directly to the assignment of other weapon application products: the lightning arrester connector, specialty capacitor, vacuum switch, and crystal resonator. Other product assignments such as active and reserve batteries and the radioisotopically-powered thermoelectric generator evolved from the plant`s materials measurement and controls technologies which are required to ensure neutron generator life.

  15. Fossil plant self assessment

    SciTech Connect (OSTI)

    Bozgo, R.H.; Maguire, B.A.

    1996-07-01

    The increasingly competitive environment of the electric utility business is focusing utilities attention on reducing the cost of electricity generation. By using benchmark indicators, gains are being sought in plant material condition with corresponding improvements in operating efficiency and capacity factor as well as reductions in Operating and Maintenance (O&M) costs. In designing a process for improvement, Consolidated Edison Company of New York, Inc. (Con Edison) plant managers were asked to review and approve objectives and criteria for Fossil Plant Operations. The program methods included optimizing work processes (including material condition, maintenance programs, work control systems, and personnel performance); team building techniques to foster personnel buy-in of the process; and long term cultural change to insure an ongoing continuous improvement process with measurable results. The program begins with a self assessment of each plant based upon the approved Objectives and Criteria. The Criteria and Review Approaches (CRAs) are established by senior management and the review team. The criteria cover Management, Operations, Maintenance, and Support Functions including Technical Support, Training and Qualification, Environmental Compliance, Chemistry, and Safety and Emergency Preparedness. The Assessment is followed by a review of corrective action plans and an interim corrective action review. Annual Assessments are planned to ensure continuous improvement. Emphasis is placed on progress made in maintenance at the fossil stations.

  16. Mechanisms in Plant Development

    SciTech Connect (OSTI)

    Hake, Sarah

    2013-08-21

    This meeting has been held every other year for the past twenty-two years and is the only regularly held meeting focused specifically on plant development. Topics covered included: patterning in developing tissues; short and long distance signaling; differentiation of cell types; the role of epigenetics in development; evolution; growth.

  17. Grace adds hydroprocessing plant

    SciTech Connect (OSTI)

    Fattah, H.

    1997-01-01

    W.R. Grace`s Davison Refining Catalysts Division will build a 20-million lbs/year hydroprocessing catalysts plant at Lake Charles, LA. The plant, planned for startup in early 1998, is part of the company`s ongoing effort to increase capacity to take advantage of significant growth in the hydroprocessing markets. The move {open_quotes}signifies a major step in our long-term commitment to the market,{close_quotes} says Robert Bullard, v.p./hydroprocessing catalysts. Davison also has an expansion scheduled for startup in February at its hydroprocessing catalysts plant at Curtis Bay, MD that will raise capacity there to 30 million lbs/year. The Lake Charles plant and the expansion total $40 million in investment, Grace says. Catalyst Consultants (Spring House, PA) expects growth of hydroprocessing demand to outstrip capacity, which is projected to grow 2.5%-3.5%/year. Demand is largely being fueled by tough environmental requirements on the sulfur content of gasoline, as well as by increased use of heavy, sour crude oil.

  18. B Plant hazards assessment

    SciTech Connect (OSTI)

    Broz, R.E.

    1994-09-23

    This document establishes the technical basis in support of Emergency Planning Activities for B Plant on the Hanford Site. The document represents an acceptable interpretation of the implementing guidance document for DOE Order 5500.3A. Through this document, the technical basis for the development of facility specific , Emergency Action Levels and the Emergency Planning Zone is demonstrated.

  19. T Plant hazards assessment

    SciTech Connect (OSTI)

    Broz, R.E.

    1994-09-27

    This document establishes the technical basis in support of Emergency Planning activities for the T Plant on the Hanford Site. The document represents an acceptable interpretation of the implementing guidance document for DOE ORDER 5500.3A. Through this document, the technical basis for the development of facility specific Emergency Action Levels and the Emergency Planning Zone is demonstrated.

  20. Getting Inside Plants | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Inside Plants Getting Inside Plants Seeing Green - This image of a rose leaf was captured with a plant imaging system that is based on the same technology used to conduct PET scans in humans. The ultimate goal of the plant imaging program is to see how plants will respond to rising levels of carbon dioxide in the atmosphere. Getting Inside Plants PET scans have been used for decades to help doctors diagnose disease in people - from cancers to heart problems. Now, the technology is

  1. Production of virus resistant plants

    DOE Patents [OSTI]

    Dougherty, W.G.; Lindbo, J.A.

    1996-12-10

    A method of suppressing virus gene expression in plants using untranslatable plus sense RNA is disclosed. The method is useful for the production of plants that are resistant to virus infection. 9 figs.

  2. Arkansas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation ...,"1,835","15,023",100.0,"Entergy Arkansas Inc" "1 Plant 2 Reactors","1,835","15,023",100.0

  3. Production of virus resistant plants

    DOE Patents [OSTI]

    Dougherty, William G.; Lindbo, John A.

    1996-01-01

    A method of suppressing virus gene expression in plants using untranslatable plus sense RNA is disclosed. The method is useful for the production of plants that are resistant to virus infection.

  4. Gene encoding plant asparagine synthetase

    DOE Patents [OSTI]

    Coruzzi, Gloria M.; Tsai, Fong-Ying

    1993-10-26

    The identification and cloning of the gene(s) for plant asparagine synthetase (AS), an important enzyme involved in the formation of asparagine, a major nitrogen transport compound of higher plants is described. Expression vectors constructed with the AS coding sequence may be utilized to produce plant AS; to engineer herbicide resistant plants, salt/drought tolerant plants or pathogen resistant plants; as a dominant selectable marker; or to select for novel herbicides or compounds useful as agents that synchronize plant cells in culture. The promoter for plant AS, which directs high levels of gene expression and is induced in an organ specific manner and by darkness, is also described. The AS promoter may be used to direct the expression of heterologous coding sequences in appropriate hosts.

  5. Louisiana Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant NameTotal Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  6. Columbia Boulevard Wastewater Treatment Plant

    SciTech Connect (OSTI)

    2005-08-01

    This is a combined heat and power (CHP) project profile on 320 kW fuel cell and microturbine power plants at Columbia Boulevard Wastewater Treatment Plant in Portland, Oregon.

  7. Integrated turbomachine oxygen plant

    SciTech Connect (OSTI)

    Anand, Ashok Kumar; DePuy, Richard Anthony; Muthaiah, Veerappan

    2014-06-17

    An integrated turbomachine oxygen plant includes a turbomachine and an air separation unit. One or more compressor pathways flow compressed air from a compressor through one or more of a combustor and a turbine expander to cool the combustor and/or the turbine expander. An air separation unit is operably connected to the one or more compressor pathways and is configured to separate the compressed air into oxygen and oxygen-depleted air. A method of air separation in an integrated turbomachine oxygen plant includes compressing a flow of air in a compressor of a turbomachine. The compressed flow of air is flowed through one or more of a combustor and a turbine expander of the turbomachine to cool the combustor and/or the turbine expander. The compressed flow of air is directed to an air separation unit and is separated into oxygen and oxygen-depleted air.

  8. Jennings Demonstration PLant

    SciTech Connect (OSTI)

    Russ Heissner

    2010-08-31

    Verenium operated a demonstration plant with a capacity to produce 1.4 million gallons of cellulosic ethanol from agricultural resiues for about two years. During this time, the plant was able to evaluate the technical issues in producing ethanol from three different cellulosic feedstocks, sugar cane bagasse, energy cane, and sorghum. The project was intended to develop a better understanding of the operating parameters that would inform a commercial sized operation. Issues related to feedstock variability, use of hydrolytic enzymes, and the viability of fermentative organisms were evaluated. Considerable success was achieved with pretreatment processes and use of enzymes but challenges were encountered with feedstock variability and fermentation systems. Limited amounts of cellulosic ethanol were produced.

  9. Power plant emissions reduction

    SciTech Connect (OSTI)

    Anand, Ashok Kumar; Nagarjuna Reddy, Thirumala Reddy

    2015-10-20

    A system for improved emissions performance of a power plant generally includes an exhaust gas recirculation system having an exhaust gas compressor disposed downstream from the combustor, a condensation collection system at least partially disposed upstream from the exhaust gas compressor, and a mixing chamber in fluid communication with the exhaust gas compressor and the condensation collection system, where the mixing chamber is in fluid communication with the combustor.

  10. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans and Reports WIPP Recovery Plan The Waste Isolation Pilot Plant (WIPP) Recovery Plan outlines the necessary steps to resume limited waste disposal operations in the first quarter of calendar year 2016. WIPP operations were suspended following an underground truck fire and a radiological release in February 2014. The recovery plan was issued on Sept. 30, 2014. Key elements of the recovery plan include strengthening safety programs, regulatory compliance, decontamination of the underground,

  11. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protective Actions Actions to Protect Workers, Public and the Environment The February 14 radioactivity release was a watershed event for the Waste Isolation Pilot Plant (WIPP). It was the first accident of its kind in the 15-year operating history of the transuranic nuclear waste repository. No workers were underground when the release occurred. There were 11 workers on the night shift at the time of the release and two additional employees entered the site in response to the accident. These 13

  12. wave energy plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plant - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy Nuclear

  13. NEUTRONIC REACTOR POWER PLANT

    DOE Patents [OSTI]

    Metcalf, H.E.

    1962-12-25

    This patent relates to a nuclear reactor power plant incorporating an air-cooled, beryllium oxide-moderated, pebble bed reactor. According to the invention means are provided for circulating a flow of air through tubes in the reactor to a turbine and for directing a sidestream of the circu1ating air through the pebble bed to remove fission products therefrom as well as assist in cooling the reactor. (AEC)

  14. US prep plant census 2008

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-10-15

    Each year Coal Age conducts a fairly comprehensive survey of the industry to produce the US coal preparation plant survey. This year's survey shows how many mergers and acquisitions have given coal operators more coal washing capacity. The plants are tabulated by state, giving basic details including company owner, plant name, raw feed, product ash %, quality, type of plant builder and year built. 1 tab., 1 photo.

  15. NEMS Modeling of Coal Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    NEMS Modeling of Coal Plants Office of Electricity, Coal, Nuclear, and Renewable Analysis Laura Martin June 14, 2016 Washington, DC 2 EMM Structure EFD ECP EFP ELD Laura Martin Washington, DC, June 14, 2016 Electricity Load and Demand Submodule Liquid Fuels Market Module Model inputs for coal plants 3 * Existing coal plants - plant specific inputs - Fixed and variable operating and maintenance costs, annual capital additions - Retrofit costs (capital and O&M) - FGD, DSI, SCR, SNCR, CCS, FF -

  16. Better Plants | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You are here Home » Technical Assistance » Better Plants Better Plants Better Plants has moved to its new <a href="http://betterbuildingssolutioncenter.energy.gov/better-plants">home</a> at the Better Buildings Solution Center, which includes new information and resources. It features effective strategies, tips, and best-practice models and more than 400 solutions. Search by topic, building type, solution type, building size, sector, technology, location, and more. Better

  17. Development of Virtual Power Plants | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Development of Virtual Power Plants

  18. Regulating nutrient allocation in plants

    SciTech Connect (OSTI)

    Udvardi, Michael; Yang, Jiading; Worley, Eric

    2014-12-09

    The invention provides coding and promoter sequences for a VS-1 and AP-2 gene, which affects the developmental process of senescence in plants. Vectors, transgenic plants, seeds, and host cells comprising heterologous VS-1 and AP-2 genes are also provided. Additionally provided are methods of altering nutrient allocation and composition in a plant using the VS-1 and AP-2 genes.

  19. Cibuni Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Hide Map Geothermal Resource Area Pengalengan Geothermal Area Geothermal Region West Java Plant Information Owner PLN Commercial Online Date 2014 Power Plant Data Type of Plant...

  20. BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel BIOENERGIZEME INFOGRAPHIC CHALLENGE: Photosynthesis: Plants Making Fuel

  1. SC Johnson Waxdale Plant | Open Energy Information

    Open Energy Info (EERE)

    SC Johnson Waxdale Plant Jump to: navigation, search Name SC Johnson Waxdale Plant Facility SC Johnson Waxdale Plant Sector Wind energy Facility Type Community Wind Facility Status...

  2. Mecca Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Plant Biomass Facility Jump to: navigation, search Name Mecca Plant Biomass Facility Facility Mecca Plant Sector Biomass Location Riverside County, California Coordinates...

  3. Deniz Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant Information Facility Type Binary Cycle Power Plant, ORC Owner MAREN Developer MAREN Energy Purchaser TEDAS Number of Units 1 Commercial Online Date 2012 Power Plant Data Type...

  4. Wairakei Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Taupo Volcanic Zone Plant Information Facility Type Binary, Wet Steam Owner Contact Energy Number of Units 12 1 Commercial Online Date 1958 Power Plant Data Type of Plant...

  5. Kakkonda Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Arc Plant Information Facility Type Single Flash Owner Tohoku Hydropower,Geothermal Energy.CoTohoku Electric Power Commercial Online Date 1978 Power Plant Data Type of Plant...

  6. Niigata Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Japanese Archipelago Plant Information Facility Type Binary Owner Wasabi Developer Wasabi Energy Purchaser EcoGen Commercial Online Date 2012 Power Plant Data Type of Plant Number...

  7. Nagqu Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Name Nagqu Geothermal Power Plant Facility Geothermal Power Plant Sector Geothermal energy Location Information Geothermal Resource Area Geothermal Region Plant Information...

  8. Pailas Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Facility Type Binary Cycle Power Plant Owner Instituto Costarricense de Electricidad Number of Units 1 1 Commercial Online Date 2011 Power Plant Data Type of Plant...

  9. Eburru Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Eburru Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Eburru Geothermal Power Plant General Information Name Eburru Geothermal Power Plant...

  10. Ndunga Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Ndunga Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Ndunga Geothermal Power Plant General Information Name Ndunga Geothermal Power Plant...

  11. Irem Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Irem Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Irem Geothermal Power Plant General Information Name Irem Geothermal Power Plant Facility...

  12. Tuzla Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Tuzla Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Tuzla Geothermal Power Plant General Information Name Tuzla Geothermal Power Plant...

  13. Sibayak Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Sibayak Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Sibayak Geothermal Power Plant General Information Name Sibayak Geothermal Power Plant...

  14. Enterprise Assessments Review, Waste Isolation Pilot Plant -...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant - December 2014 Enterprise Assessments Review, Waste Isolation Pilot Plant - December 2014 December, 2014 Review of the Waste Isolation Pilot Plant ...

  15. Hull Municipal Light Plant | Open Energy Information

    Open Energy Info (EERE)

    Hull Municipal Light Plant Jump to: navigation, search Logo: Hull Municipal Light Plant Name: Hull Municipal Light Plant Place: Massachusetts Phone Number: 781-925-0051 Website:...

  16. Geothermal Steam Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Steam Power Plant (Redirected from Dry Steam) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home General List of Dry Steam Plants List of Flash Steam Plants...

  17. Geothermal/Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant < Geothermal(Redirected from Power Plant) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Planning Leasing Exploration Well Field Power Plant Grid...

  18. Plant Metabolic Imaging | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Metabolic Imaging The Ames Laboratory has developed state-of-the-art processes for imaging plant metabolites. Identifying and understanding plant chemicals will lead to the ...

  19. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  20. Plant Optimization Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Science & Innovation Clean Coal Crosscutting Research Plant Optimization Technologies Plant ... which has not been used in pulverized coal-fired power generation plants. ...

  1. Chemical and toxicological characterization of slurry reactor biotreatment of explosives-contaminated soils

    SciTech Connect (OSTI)

    Griest, W.H.; Stewart, A.J.; Vass, A.A.; Ho, C.H.

    1998-08-01

    Treatment of 2,4,6-trinitrotoluene (TNT)-contaminated soil in the Joliet Army Ammunition Plant (JAAP) soil slurry bioreactor (SSBR) eliminated detectable TNT but left trace levels of residual monoamino and diamino metabolites under some reactor operating conditions. The reduction of solvent-extractable bacterial mutagenicity in the TNT-contaminated soil was substantial and was similar to that achieved by static pile composts at the Umatilla Army Depot Activity (UMDA) field demonstration. Aquatic toxicity to Ceriodaphnia dubia from TNT in the leachates of TNT-contaminated soil was eliminated in the leachates of JAAP SSBR product soil. The toxicity of soil product leachates to Ceriodaphnia dubia was reasonably predicted using the specific toxicities of the components detected, weighted by their leachate concentrations. In samples where TNT metabolites were observed in the soil product and its leachates, this method determined that the contribution to predicted toxicity values was dominated by trace amounts of the diamino-metabolites, which are very toxic to ceriodaphnia dubia. When the SSBR operating conditions reduced the concentrations of TNT metabolites in the product soils and their leachates to undetectable concentrations, the main contributors to predicted aquatic toxicity values appeared to be molasses residues, potassium, and bicarbonate. Potassium and bicarbonate are beneficial or benign to the environment, and molasses residues are substantially degraded in the environment. Exotoxins, pathogenic bacteria, inorganic particles, ammonia, and dissolved metals did not appear to be important to soil product toxicity.

  2. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  3. Superfund record of decision (EPA Region 7): Weldon Spring Quarry/Plant/Pits (USDOE), St. Charles, MO, September 30, 1998

    SciTech Connect (OSTI)

    1999-03-01

    The Weldon Spring Quarry is one of two noncontiguous areas that constitute the US Department of Energy`s (DOE) Weldon Spring site. The main area of the site is the chemical plant. Both areas are located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The US Environmental Protection Agency (EPA) listed the quarry on the National Priorities List (NPL) in 1987, and the chemical plant area was added to the list in 1989. The quarry is about 6.4 km (4 mi) south-southwest of the chemical plant area; it is accessible from State Route 94 and is currently fenced and closed to the public. The quarry is approximately 300 m (1,000 ft) long by 140 m (450 ft) wide and covers an area of approximately 3.6 ha (9 acres). The quarry was used by the Army for disposal of chemically contaminated (explosive) materials in the 1940s and was later used for the disposal of radioactively contaminated material by the Atomic Energy Commission (AEC) in the 1960s. Approximately 110,000 m{sup 3} (144,000 yd{sup 3}) of soil and waste material was removed from the quarry and transported to the chemical plant area as part of completing the remedial action stipulated in the Record of Decision (ROD) for the Quarry Bulk Waste Operable Unit (DOE 1990). Bulk waste removal was completed in October 1995. These wastes have been placed in the disposal cell at the chemical plant. Prior to bulk waste removal, contaminated water contained in the quarry pond was also removed; approximately 170 million liters (44 million gal) have been treated as of March 1998.

  4. Post-closure permit application for the Kerr Hollow Quarry at the Y-12 plant

    SciTech Connect (OSTI)

    1995-06-01

    The Kerr Hollow Quarry (KHQ) is located on U.S. Department of Energy (DOE) property at the Y-12 Plant, Oak Ridge, Tennessee. The Oak Ridge Y-12 Plant was built by the U.S. Army Corps of Engineers in 1943 as part of the Manhattan Project. Until 1992, the primary mission of the Y-12 Plant was the production and fabrication of nuclear weapons components. Activities associated with these functions included production of lithium compounds, recovery of enriched uranium from scrap material, and fabrication of uranium and other materials into finished parts for assemblies. The Kerr Hollow Quarry was used for waste disposal of a variety of materials including water-reactive and shock-sensitive chemicals and compressed gas cylinders. These materials were packaged in various containers and sank under the water in the quarry due to their great weight. Disposal activities were terminated in November, 1988 due to a determination by the Tennessee Department of Environment and Conservation that the quarry was subject to regulations under the Resource Conservation and Recovery Act of 1993. Methods of closure for the quarry were reviewed, and actions were initiated to close the quarry in accordance with closure requirements for interim status surface impoundments specified in Tennessee Rules 1200-1-11-.05(7) and 1200-1-11-.05(11). As part of these actions, efforts were made to characterize the physical and chemical nature of wastes that had been disposed of in the quarry, and to remove any containers or debris that were put into the quarry during waste disposal activities. Closure certification reports (Fraser et al. 1993 and Dames and Moore 1993) document closure activities in detail. This report contains the post-closure permit application for the Kerr Hollow Quarry site.

  5. THE SCIOTO ORDNANCE PLANT

    Office of Legacy Management (LM)

    ' 1 . \." _ j. .I > * .A; .i ,' / / ,/ ' , ( , ( 1: 1 i I l-1 5 ' / ,,' :A' ' , THE SCIOTO ORDNANCE PLANT . and THE MARION ENGINEER DEPOT of Marion, Ohio A Profile AFTER FORTY YEARS BY Charles D. Mosher and Delpha Ruth Mosher . . . 111 THE AUTHORS Charles D. Mosher was born on a farm located in Morrow County on Mosher Road near Mt. Gilead. He received his TH.B. from Malone College, B.A. from Baldwin-Wallace College and his B.Div. and M.Div. at the Nazarene Theological Seminary in Kansas

  6. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/25/16 WIPP Home Page About WIPP Contact Us Search About WIPP The nation's only deep geologic repository for nuclear waste The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for permanent disposal of a specific type of waste that is the byproduct of the nation's nuclear defense program. CH and RH Waste WIPP is the nation's only repository for the disposal of nuclear waste known as transuranic, or TRU, waste. It consists of clothing, tools,

  7. Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    What happened at WIPP in February 2014 Burned Truck Salt hauling truck after the fire Two isolated events took place at the Waste Isolation Pilot Plant (WIPP) in February. On February 5, a salt haul truck caught fire. Workers were evacuated, and the underground portion of WIPP was shut down. Six workers were treated for smoke inhalation. Nine days later, late in the evening of February 14, a second, unrelated event occurred when a continuous air monitor (CAM) alarmed during the night shift. Only

  8. Binary Cycle Power Plant | Open Energy Information

    Open Energy Info (EERE)

    binary-cycle power plants in the future will be binary-cycle plants1 Enel's Salts Wells Geothermal Plant in Nevada: This plant is a binary system that is rated at 13 MW...

  9. Okeanskaya Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Okeanskaya Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Okeanskaya Geothermal Power Plant General Information Name Okeanskaya Geothermal...

  10. Pauzhetskaya Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Pauzhetskaya Geothermal Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Pauzhetskaya Geothermal Power Plant General Information Name Pauzhetskaya...

  11. Ulumbu Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Ulumbu Geothermal Power Plant Facility Geothermal Power Plant Sector Geothermal energy Location Information Address Kupang Location Indonesia Coordinates...

  12. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self?funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty?three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  13. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  14. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  15. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  16. The SONATRACH jumbo LPG plant

    SciTech Connect (OSTI)

    Ahmed Khodja, A.; Bennaceur, A.

    1988-01-01

    The authors aim is to give to the 17 TH world gas conference a general idea on SONATRACH LPG PLANT which is located in the ARZEW area. They develop this communication as follows: general presentation of LPG plant: During the communication, the author's will give the assistance all the information concerning the contractions the erection's date and the LPG PLANT process, start-up of the plant: In this chapter, the authors's will describe the start-up condition, the performance test result, the flexibility test result and the total mechanical achievement of the plant; operation by SONATRACH: After the success that obtained during the mechanical achievement and performance test, the contractor handed over the plant to SONATRACH.

  17. Radioactive and Chemical Waste Characterization, Segregation, and Remedial Action at the Fusrap Middlesex Sampling Plant Site

    SciTech Connect (OSTI)

    Wankum, R.D.; Kenney, J.; Mizrahi, M.; O'Dwyer, P.; Miller, D.M.

    2007-07-01

    The challenge of the Formerly Utilized Sites Remedial Action Program (FUSRAP) designated Middlesex Sampling Plant (MSP) site is to economically meet the clean up criteria for both radiological and chemical hazards present. The goal is to ensure the site is remediated in accordance with the Record of Decision (ROD), while at the same time minimizing waste generation and maintaining the lowest disposal costs possible. This paper describes the results achieved to date during remediation activities. The U.S. Army Corps of Engineers (USACE) contracted ECC as the prime contractor to perform the remediation. The project is being performed under a Performance Based task order utilizing design-build processes. ECC has utilized multiple screening processes to first segregate and minimize the amount of material that needs to be handled as radioactive material, and secondly to segregate and minimize the amount of material that needs to be handled as hazardous. This process is allowing ECC to meet the cleanup criteria while minimizing cost. (authors)

  18. ATOMIC POWER PLANT

    DOE Patents [OSTI]

    Daniels, F.

    1957-11-01

    This patent relates to neutronic reactor power plants and discloses a design of a reactor utilizing a mixture of discrete units of a fissionable material, such as uranium carbide, a neutron moderator material, such as graphite, to carry out the chain reaction. A liquid metal, such as bismuth, is used as the coolant and is placed in the reactor chamber with the fissionable and moderator material so that it is boiled by the heat of the reaction, the boiling liquid and vapors passing up through the interstices between the discrete units. The vapor and flue gases coming off the top of the chamber are passed through heat exchangers, to produce steam, for example, and thence through condensers, the condensed coolant being returned to the chamber by gravity and the non- condensible gases being carried off through a stack at the top of the structure.

  19. (Photosynthesis in intact plants)

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Progress in the two years since the last renewal application has been excellent. We have made substantial contributions on both main fronts of the projects, and are particularly happy with the progress of our research on intact plants. The approach of basing our field work on a sound foundation of laboratory studies has enabled is to use methods which provide unambiguous assays of well characterized reactions. We have also made excellent progress in several laboratory studies which will have direct applications in future field work, and have introduced to the laboratory a range of molecular genetics techniques which will allow us to explore new options in the attempt to understand function at the level of molecular structure.

  20. Power Plant Modeling and Simulation

    ScienceCinema (OSTI)

    None

    2010-01-08

    The National Energy Technology Laboratory's Office of Research and Development provides open source tools and expetise for modeling and simulating power plants and carbon sequestration technologies.

  1. Power Plant Modeling and Simulation

    SciTech Connect (OSTI)

    2008-07-21

    The National Energy Technology Laboratory's Office of Research and Development provides open source tools and expetise for modeling and simulating power plants and carbon sequestration technologies.

  2. "NATURAL GAS PROCESSING PLANT SURVEY"

    U.S. Energy Information Administration (EIA) Indexed Site

    ... connected to the plant. (Please check all that apply.)" "Name:" "Capacity (list amount and check units):",,,..." MMcfDay",,,,," BblsDay" "Pipeline ...

  3. Maryland Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Calvert Cliffs Nuclear Power Plant Unit 1, Unit 2","1,705","13,994",100.0,"Calvert Cliffs Nuclear PP Inc" "1 Plant 2 Reactors","1,705","13,994",100.0 "Note: Totals

  4. Better Buildings, Better Plants Program

    SciTech Connect (OSTI)

    2011-12-08

    The Better Buildings, Better Plants Program is part of a national leadership initiative calling on business leaders and others to create American jobs through energy efficiency.

  5. disrupting the plant cell wall

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    disrupting the plant cell wall - Sandia Energy Energy Search Icon Sandia Home Locations ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  6. Phytozome Comparative Plant Genomics Portal

    SciTech Connect (OSTI)

    Goodstein, David; Batra, Sajeev; Carlson, Joseph; Hayes, Richard; Phillips, Jeremy; Shu, Shengqiang; Schmutz, Jeremy; Rokhsar, Daniel

    2014-09-09

    The Dept. of Energy Joint Genome Institute is a genomics user facility supporting DOE mission science in the areas of Bioenergy, Carbon Cycling, and Biogeochemistry. The Plant Program at the JGI applies genomic, analytical, computational and informatics platforms and methods to: 1. Understand and accelerate the improvement (domestication) of bioenergy crops 2. Characterize and moderate plant response to climate change 3. Use comparative genomics to identify constrained elements and infer gene function 4. Build high quality genomic resource platforms of JGI Plant Flagship genomes for functional and experimental work 5. Expand functional genomic resources for Plant Flagship genomes

  7. Owners of nuclear power plants

    SciTech Connect (OSTI)

    Hudson, C.R.; White, V.S.

    1996-11-01

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  8. Owners of Nuclear Power Plants

    SciTech Connect (OSTI)

    Reid, R.L.

    2000-01-12

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of November 1999. The report is divided into sections representing different aspects of nuclear plant ownership.

  9. MHD plant turn down considerations

    SciTech Connect (OSTI)

    Lineberry, J.T.; Chapman, J.N.

    1991-01-01

    The topic of part load operation of the MHD power plant is assessed. Current and future planned MHD research is reviewed in terms of addressing topping and bottoming cycle integration needs. The response of the MHD generator to turn up and down scenarios is reviewed. The concept of turning the MHD power to met changes in plant load is discussed. The need for new ideas and focused research to study MHD plant integration and problems of plant turn down and up is cited. 7 refs., 5 figs., 1 tab.

  10. Next Generation Geothermal Power Plants

    SciTech Connect (OSTI)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine

  11. Refinery, petrochemical plant injuries decline

    SciTech Connect (OSTI)

    Not Available

    1994-07-25

    The National Petroleum Refiners Association (NPRA) reports a 7% reduction in workplace injury and illness incidence rates for refineries in 1993, and a 21% decrease for petrochemical plants. The report summarizes data from 135 of the 162 US member refineries, and 117 of the 172 US member petrochemical plants. This paper summarizes the report findings.

  12. Overview of enrichment plant safeguards

    SciTech Connect (OSTI)

    Swindle, D.W. Jr.; Wheeler, L.E.

    1982-01-01

    The relationship of enrichment plant safeguards to US nonproliferation objectives and to the operation and management of enrichment facilities is reviewed. During the review, the major components of both domestic and international safeguards systems for enrichment plants are discussed. In discussing domestic safeguards systems, examples of the technology currently in use to support nuclear materials accountability are described including the measurement methods, procedures and equipment used for weighing, sampling, chemical and isotopic analyses and nondestructive assay techniques. Also discussed is how the information obtained as part of the nuclear material accountancy task is useful to enrichment plant operations. International material accountancy verification and containment/surveillance concepts for enrichment plants are discussed, and the technologies presently being developed for international safeguards in enrichment plants are identified and the current development status is reported.

  13. Early Entrance Coproduction Plant

    SciTech Connect (OSTI)

    Mushtaq Ahmed; John H. Anderson; Earl R. Berry; Troy Raybold; Lalit S. Shah; Kenneth A. Yackly

    2004-01-26

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objectives of Phase I were to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The work performed under Phase II will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation.

  14. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Mushtaq Ahmed; John H. Anderson; Charles Benham; Earl R. Berry; Fred Brent; Belma Demirel; Ming He; Troy Raybold; Manuel E. Quintana; Lalit S. Shah; Kenneth A. Yackly

    2003-06-09

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objectives of Phase I were to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation.

  15. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Mushtaq Ahmed; John H. Anderson; Earl R. Berry; Fred Brent; Ming He; Jimmy O. Ong; Mike K. Porter; Randy Roberts; Charles H. Schrader; Lalit S. Shah; Kenneth A. Yackly

    2002-11-22

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and/or other carbonaceous feedstocks. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation.

  16. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    John S. Abughazaleh; Mushtaq Ahmed; Ashok Anand; John H. Anderson; Charles Benham; Fred D. Brent; Thomas E. Chance; William K. Davis; Raymond F. Drnevich; Larry Hall; Ming He; Stephen A. Lang; David Mintner; Wendy Moore; Jimmy O. Ong; George Potoczniak; Adela G. Sanchez; Charles H. Schrader; Lalit S. Shah; Kalapi D. Sheth; Phil J. Shires; Rae Song

    2001-05-17

    The overall objective of this project is the three-phase development of an Early Entrance Coproduction Plant (EECP) that produces at least one product from at least two of the following three categories: Electric power (or heat); Fuels; and Chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or some other carbonaceous feedstock, such as petroleum coke. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Testing (RD and T) Plan for implementation in Phase II. This objective has now been accomplished. A specific site, Motiva Refinery in Port Arthur, Texas, has been selected as the location best suited for the EECP. The accomplishments of Phase I are discussed in detail in this Phase I Concept Report. A RD and T Plan and a preliminary project financing plan have been developed and are submitted separately from this report.

  17. Portsmouth Gaseous Diffusion Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View Portsmouth Gaseous Diffusion Plant | November 2009 Aerial View The current mission at the Portsmouth Gaseous Diffusion Plant is to effectively implement EM responsibilities, obligations and activities to accomplish environmental remediation actions in compliance with regulatory milestones and agreements; disposition legacy and newly generated waste; implement Cold

  18. Nebraska Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Nebraska nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Cooper Unit 1",767,"6,793",61.4,"Nebraska Public Power District" "Fort Calhoun Unit 1",478,"4,261",38.6,"Omaha Public Power District" "2 Plants 2

  19. Melvin Calvin: Fuels from Plants

    SciTech Connect (OSTI)

    Taylor, S.E.; Otvos, J.W.

    1998-11-24

    A logical extension of his early work on the path of carbon during photosynthesis, Calvin's studies on the production of hydrocarbons by plants introduced many in the scientific and agricultural worlds to the potential of renewable fuel and chemical feedstocks. He and his co-workers identified numerous candidate compounds from plants found in tropical and temperate climates from around the world. His travels and lectures concerning the development of alternative fuel supplies inspired laboratories worldwide to take up the investigation of plant-derived energy sources as an alternative to fossil fuels.

  20. Iowa Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Iowa nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Duane Arnold Energy Center Unit 1",601,"4,451",100.0,"NextEra Energy Duane Arnold LLC" "1 Plant 1 Reactor",601,"4,451",100.0

  1. Kansas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Kansas nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Wolf Creek Generating Station Unit 1","1,160","9,556",100.0,"Wolf Creek Nuclear Optg Corp" "1 Plant 1 Reactor","1,160","9,556",100.0

  2. Louisiana Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant Name/Total Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (Pprcent)","Owner" "River Bend Unit 1",974,"8,363",44.9,"Entergy Gulf States - LA LLC" "Waterford 3 Unit 3","1,168","10,276",55.1,"Entergy Louisiana Inc" "2 Plants 2

  3. Massachusetts Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Pilgrim Nuclear Power Station Unit 1",685,"5,918",100.0,"Entergy Nuclear Generation Co" "1 Plant 1 Reactor",685,"5,918",100.0 "Note: Totals may not equal sum of components due to

  4. Mississippi Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Mississippi nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Grand Gulf Unit 1","1,251","9,643",100.0,"System Energy Resources, Inc" "1 Plant 1 Reactor","1,251","9,643",100.0

  5. Missouri Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Callaway Unit 1","1,190","8,996",100.0,"Union Electric Co" "1 Plant 1 Reactor","1,190","8,996",100.0 "Note: Totals may not equal sum of components due to

  6. Arizona Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Palo Verde Unit 1, Unit 2, Unit 3","3,937","31,200",100.0,"Arizona Public Service Co" "1 Plant 3 Reactors","3,937","31,200",100.0 "Note: Totals may not equal sum of

  7. Arkansas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Arkansas Nuclear One Unit 1, Unit 2","1,835","15,023",100.0,"Entergy Arkansas Inc" "1 Plant 2 Reactors","1,835","15,023",100.0

  8. Connecticut Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Connecticut nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Millstone Unit 2, Unit 3","2,103","16,750",100.0,"Dominion Nuclear Conn Inc" "1 Plant 2 Reactors","2,103","16,750",100.0

  9. Georgia Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Edwin I Hatch Unit 1, Unit 2","1,759","13,902",41.5,"Georgia Power Co" "Vogtle Unit 1, Unit 2","2,302","19,610",58.5,"Georgia Power Co" "2 Plants 4

  10. Tennessee Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Sequoyah Unit 1, Unit 2","2,278","18,001",64.9,"Tennessee Valley Authority" "Watts Bar Nuclear Plant Unit 1","1,123","9,738",35.1,"Tennessee Valley

  11. Plutonium Processing Plant Deactivated | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Plutonium Processing Plant Deactivated Plutonium Processing Plant Deactivated Hanford, WA The Plutonium Uranium Extraction Facility (PUREX), the largest of the Nation's Cold War plutonium processing plants, is deactivated a year ahead of schedule

  12. Reducing Plant Lignin for Cheaper Biofuels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reducing Plant Lignin for Cheaper Biofuels Reducing Plant Lignin for Cheaper Biofuels Print Wednesday, 04 May 2016 12:11 Lignin is a polymer that permeates plant cell walls. ...

  13. Plant maintenance and plant life extension issue, 2009

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-03-15

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Application of modeling and simulation to nuclear power plants, by Berry Gibson, IBM, and Rolf Gibbels, Dassault Systems; Steam generators with tight manufacturing procedures, by Ei Kadokami, Mitsubishi Heavy Industries; SG design based on operational experience and R and D, by Jun Tang, Babcock and Wilcox Canada; Confident to deliver reliable performance, by Bruce Bevilacqua, Westinghouse Nuclear; An evolutionary plant design, by Martin Parece, AREVA NP, Inc.; and, Designed for optimum production, by Danny Roderick, GE Hitachi Nuclear Energy. Industry Innovation articles include: Controlling alloy 600 degradation, by John Wilson, Exelon Nuclear Corporation; Condensate polishing innovation, by Lewis Crone, Dominion Millstone Power Station; Reducing deposits in steam generators, by the Electric Power Research Institute; and, Minimizing Radiological effluent releases, by the Electric Power Research Institute. The plant profile article is titled 2008 - a year of 'firsts' for AmerenUE's Callaway plant, by Rick Eastman, AmerenUE.

  14. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    John Anderson; Charles Schrader

    2004-01-26

    In 1999, the U. S. Department of Energy (DOE) awarded a Cooperative Agreement to Texaco Energy Systems Inc. to provide a preliminary engineering design of an Early Entrance Coproduction Plant (EECP). Since the award, continuous and diligent work has been undertaken to achieve the design of an economical facility that makes strides toward attaining the goal of DOE's Vision 21 Program. The objective of the EECP is to convert coal and/or petroleum coke to power while coproducing transportation fuels, chemicals, and useful utilities such as steam. This objective is being pursued in a three-phase effort through the partnership of the DOE with prime contractor Texaco Energy Systems, LLC. (TES), the successor to Texaco Energy Systems, Inc. The key subcontractors to TES include General Electric (GE), Praxair, and Kellogg Brown and Root. ChevronTexaco provided gasification technology and Rentech Inc.'s Fischer-Tropsch (F-T) technology that has been developed for non-natural gas sources. GE provided gas turbine technology for the combustion of low energy content gas. Praxair provided air separation technology and KBR provided engineering to integrate the facility. A conceptual design was completed in Phase I and the report was accepted by the DOE in May 2001. The Phase I work identified risks and critical research, development, and testing that would improve the probability of technical success of the EECP. The objective of Phase II was to mitigate the risks by executing research, development, and testing. Results from the Phase II work are the subject of this report. As the work of Phase II concluded, it became evident that sufficient, but not necessarily complete, technical information and data would be available to begin Phase III - Preliminary Engineering Design. Work in Phase II requires additional technical development work to correctly apply technology at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental

  15. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    David Storm; Govanon Nongbri; Steve Decanio; Ming He; Lalit Shah; Charles Schrader; Earl Berry; Peter Ricci; Belma Demirel; Charles Benham; Mark Bohn

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important

  16. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Fred D. Brent; Lalit Shah; Earl Berry; Charles H. Schrader; John Anderson; Ming He; James F. Stevens; Centha A. Davis; Michael Henley; Jerome Mayer; Harry Tsang; Jimell Erwin; Jennifer Adams; Michael Tillman; Chris Taylor; Marjan J. Roos; Robert F. Earhart

    2004-01-27

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture

  17. Plant salt-tolerance mechanisms

    SciTech Connect (OSTI)

    Deinlein, Ulrich; Stephan, Aaron B.; Horie, Tomoaki; Luo, Wei; Xu, Guohua; Schroeder, Julian I.

    2014-06-01

    Crop performance is severely affected by high salt concentrations in soils. To engineer more salt-tolerant plants it is crucial to unravel the key components of the plant salt-tolerance network. Here we review our understanding of the core salt-tolerance mechanisms in plants. Recent studies have shown that stress sensing and signaling components can play important roles in regulating the plant salinity stress response. We also review key Na+ transport and detoxification pathways and the impact of epigenetic chromatin modifications on salinity tolerance. In addition, we discuss the progress that has been made towards engineering salt tolerance in crops, including marker-assisted selection and gene stacking techniques. We also identify key open questions that remain to be addressed in the future.

  18. Arizona Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Palo Verde Unit 1, Unit 2, Unit 3","3,937","31,200",100.0,"Arizona Public Service Co" "1 Plant 3 ...

  19. New Guinea schedules ethanol plants

    SciTech Connect (OSTI)

    Not Available

    1981-01-28

    It is reported that the Government of Papua New Guinea plans to build nine ethanol plants based on cassava to meet half the nation's transport fuel needs by 1990.

  20. Washington Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    of State nuclear net generation (percent)","Owner" "Columbia Generating Station Unit 2","1,097","9,241",100.0,"Energy Northwest" "1 Plant 1 Reactor","1,097","9,241",100.0

  1. Mississippi Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    mwh)","Share of State nuclear net generation (percent)","Owner" "Grand Gulf Unit 1","1,251","9,643",100.0,"System Energy Resources, Inc" "1 Plant 1 Reactor","1,251","9,643",100.0

  2. Massachusetts Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Power Station Unit 1",685,"5,918",100.0,"Entergy Nuclear Generation Co" "1 Plant 1 Reactor",685,"5,918",100.0 "Note: Totals may not equal sum of components due to independent ...

  3. Missouri Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    "Callaway Unit 1","1,190","8,996",100.0,"Union Electric Co" "1 Plant 1 Reactor","1,190","8,996",100.0 "Note: Totals may not equal sum of components due to ...

  4. Kansas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear net generation (percent)","Owner" "Wolf Creek Generating Station Unit 1","1,160","9,556",100.0,"Wolf Creek Nuclear Optg Corp" "1 Plant 1 Reactor","1,160","9,556",100.0

  5. Vermont Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    mwh)","Share of State nuclear net generation (percent)","Owner" "Vermont Yankee Unit 1",620,"4,782",100.0,"Entergy Nuclear Vermont Yankee" "1 Plant 1 Reactor",620,"4,782",100.0

  6. Iowa Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    of State nuclear net generation (percent)","Owner" "Duane Arnold Energy Center Unit 1",601,"4,451",100.0,"NextEra Energy Duane Arnold LLC" "1 Plant 1 Reactor",601,"4,451",100.0

  7. Development of BWR plant analyzer

    SciTech Connect (OSTI)

    Wulff, W.; Cheng, H.S.; Lekach, S.V.; Stritar, A.; Mallen, A.N.

    1984-01-01

    The BWR Plant Analyzer has been developed for realistic and accurate simulations of normal and severe abnormal transients in BWR power plants at high simulation speeds, low capital and operating costs and with outstanding user conveniences. The simulation encompasses neutron kinetics, heat conduction in fuel structures, nonequilibrium, nonhomogeneous coolant dynamics, steam line acoustics, and the dynamics of turbines, condensers, feedwater pumps and heaters, of the suppression pool, the control systems and the plant protection systems. These objectives have been achieved. Advanced modeling, using extensively analytical integration and dynamic evaluation of analytical solutions, has been combined with modern minicomputer technology for high-speed simulation of complex systems. The High-Speed Interactive Plant Analyzer code HIPA-BWR has been implemented on the AD10 peripheral parallel processor.

  8. Plant salt-tolerance mechanisms

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Deinlein, Ulrich; Stephan, Aaron B.; Horie, Tomoaki; Luo, Wei; Xu, Guohua; Schroeder, Julian I.

    2014-06-01

    Crop performance is severely affected by high salt concentrations in soils. To engineer more salt-tolerant plants it is crucial to unravel the key components of the plant salt-tolerance network. Here we review our understanding of the core salt-tolerance mechanisms in plants. Recent studies have shown that stress sensing and signaling components can play important roles in regulating the plant salinity stress response. We also review key Na+ transport and detoxification pathways and the impact of epigenetic chromatin modifications on salinity tolerance. In addition, we discuss the progress that has been made towards engineering salt tolerance in crops, including marker-assisted selectionmore » and gene stacking techniques. We also identify key open questions that remain to be addressed in the future.« less

  9. Upgrading coal plant damper drives

    SciTech Connect (OSTI)

    Hood, N.R.; Simmons, K.

    2009-11-15

    The replacement of damper drives on two coal-fired units at the James H. Miller Jr. electric generating plant by Intelligent Contrac electric rotary actuators is discussed. 2 figs.

  10. Oguni Town Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Keiyo Plant Engineering Co, Waita Geothermal Power Plant, Chuo Electric Power Co Energy Purchaser Toshiba Commercial Online Date 2014 Power Plant Data Type of Plant Number...

  11. T Plant, Chemical Separation Building | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan Project Signature Facilities T Plant, Chemical Separation Building T Plant, Chemical Separation Building Photos of T-plant's construction and T-Plant's Chemical ...

  12. EMei Semiconductor Materials Plant Research Institute | Open...

    Open Energy Info (EERE)

    EMei Semiconductor Materials Plant Research Institute Jump to: navigation, search Name: EMei Semiconductor Materials Plant & Research Institute Place: Emei, Sichuan Province, China...

  13. Kamojang Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Java, Indonesia Coordinates -7.1386705960014, 107.78536749043 Loading map......

  14. Dieng Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Java; Indonesia Coordinates -7.2227512797154, 110.01006889972 Loading map......

  15. Brighter Future for Kentucky Manufacturing Plants | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brighter Future for Kentucky Manufacturing Plants Brighter Future for Kentucky Manufacturing Plants May 28, 2010 - 3:04pm Addthis Montaplast North America, Inc. is replacing almost ...

  16. Better Plants Program Progress Update: Fall 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Better Buildings, Better Plants Program is a national partnership initiative that ... 200 billion each year to power their plants. 1 The industrial sector has the ...

  17. Capturing Pioneer Plant Experience: Implications for Synfuels...

    Office of Environmental Management (EM)

    plants, the first set of synfuel technology projects will generate experience and information that will be valuable to firms contemplating investments in subsequent plants ...

  18. Mohave Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Solar Power Plant Jump to: navigation, search Name Mohave Solar Power Plant Facility Mojave Solar Sector Solar Facility Type Concentrating Solar Power Facility Status Under...

  19. Qing an Cogeneration Plant | Open Energy Information

    Open Energy Info (EERE)

    Qing an Cogeneration Plant Jump to: navigation, search Name: Qing'an Cogeneration Plant Place: Heilongjiang Province, China Zip: 152400 Sector: Biomass Product: China-based biomass...

  20. Hatchobaru Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Hatchobaru Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Oita, Japan Coordinates 33.106330525676,...

  1. Ogiri Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Ogiri Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Kagoshima, Japan Coordinates 31.954053520674,...

  2. Uenotai Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Uenotai Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Akita, Japan Coordinates 39.001204660867,...

  3. Yamagawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Yamagawa Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Kagoshima, Japan Coordinates 31.953944283105,...

  4. Onuma Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Onuma Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Akita, Japan Coordinates 39.981918665315,...

  5. Mori Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Mori Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Hokkaido, Japan Coordinates 42.132906551396,...

  6. Otake Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Otake Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Oita, Japan Coordinates 33.105767212548,...

  7. Sumikawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Information Name Sumikawa Geothermal Power Plant Facility Power Plant Sector Geothermal energy Location Information Location Akita, Japan Coordinates 39.938819458336,...

  8. Furong Hydropower Plant | Open Energy Information

    Open Energy Info (EERE)

    Furong Hydropower Plant Jump to: navigation, search Name: Furong Hydropower Plant Place: Shaanxi Province, China Zip: 725400 Sector: Hydro Product: China-based small hydro project...

  9. Matsukawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Facility Type Dry Steam, Low Pressure Reaction Owner Tohoku HydropowerGeothermal Energy Co Number of Units 1 Commercial Online Date 1966 Power Plant Data Type of Plant...

  10. Zunil Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Volcanic Arc Chain Plant Information Facility Type Binary Cycle Power Plant Owner Ormat Energy Purchaser Instituto Nacional de Electrificacion Number of Units 7 Commercial Online...

  11. Pamukoren Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Facility Type Binary Cycle Power Plant, ORC Owner CELIKLER Developer MTA-CELIKLER Energy Purchaser TEDAS Number of Units 1 Commercial Online Date 2013 Power Plant Data Type...

  12. Los Azufres Geothermal Plant | Open Energy Information

    Open Energy Info (EERE)

    Volcanic Belt Plant Information Facility Type Single Flash, Binary, Back Pressure Energy Purchaser Comisin Federal de Electricidad Commercial Online Date 1982 Power Plant...

  13. Momotombo Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant Information Facility Type Double Flash, Binary Owner Empresa Nicaraguense de Electricidad (ENEL) Number of Units 3 1 Commercial Online Date 1983 Power Plant Data Type of...

  14. SULI Intern: Plant Health | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Health Share Listen to Argonne intern Michelle Michaels talk about how she studied trends in plant health to help farmers determine crop yield during the growing season. ...

  15. Dongara Pellet Plant | Open Energy Information

    Open Energy Info (EERE)

    Dongara Pellet Plant Jump to: navigation, search Name: Dongara Pellet Plant Place: Michigan Sector: Renewable Energy Product: The business of Dongara will be to develop, own and...

  16. New Jersey Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  17. New York Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net ...

  18. Waste Treatment and Immobilation Plant Pretreatment Facility

    Office of Environmental Management (EM)

    7 Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) ... Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) ...

  19. South Carolina Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    South Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State ...

  20. North Carolina Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear ...

  1. Rotokawa Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Power Plant General Information Name Rotokawa Geothermal Power Plant Sector Geothermal energy Location Information Location 14km NE of Taupo, Waikato, New Zealand Coordinates...

  2. Bjarnaflag Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant General Information Name Bjarnaflag Geothermal Power Plant Sector Geothermal energy Location Information Location Lake Myvatn, Iceland Coordinates 65.640833,...

  3. Waste Isolation Pilot Plant Transportation Security | Department...

    Office of Environmental Management (EM)

    Transportation Security Waste Isolation Pilot Plant Transportation Security Waste Isolation Pilot Plant Transportation Security (2.41 MB) More Documents & Publications Enterprise ...

  4. Lihir Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Lihir Geothermal Power Plant General Information Name Lihir Geothermal Power Plant Sector Geothermal energy Location Information Location Lihir Island, Papua New Guinea Coordinates...

  5. Ngatamariki Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Name Ngatamariki Geothermal Power Plant Facility Geothermal Power Plant Sector Geothermal energy Location Information Address Mighty River Power Ngahere House 283...

  6. New Hampshire Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (nw)","Net generation (thousand mwh)","Share of State nuclear net ...

  7. Sandia Energy - Waste Isolation Pilot Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Isolation Pilot Plant Home Analysis A photo of Drum 68660 during the WIPP incident investigation. Permalink Gallery Waste Isolation Pilot Plant Technical Assessment Report...

  8. Additional Better Plants Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Building, Better Plants Challenge to manage and save energy. Better Plants 2015: Look Ahead Energy Efficiency: ... Implementation Models - successful approaches to ...

  9. Independent Oversight Assessment, Pantex Plant - November 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment, Pantex Plant - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Pantex Plant This report provides the results of an independent assessment of...

  10. Plutonium Uranium Extraction Plant (PUREX) - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About Us Projects & Facilities Plutonium Uranium Extraction Plant (PUREX) About Us About ... and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage ...

  11. IAAP. However, Pantex Plant Option 2

    Office of Legacy Management (LM)

    relocation to IAAP. However, Pantex Plant Option 2 provided a greater degree of ... attained for all facilities at the Pantex Plant by implementation of Option 2. Therefore, ...

  12. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  13. Independent Oversight Inspection, Pantex Plant, Summary Report...

    Office of Environmental Management (EM)

    Plant, Summary Report - November 2002 Independent Oversight Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and ...

  14. Independent Activity Report, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Portsmouth Gaseous Diffusion Plant - August 2011 Independent Activity Report, Portsmouth Gaseous Diffusion Plant - August 2011 August 2011 Orientation Visit to the Portsmouth ...

  15. Reduction-Oxidation Plant (REDOX) - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Reduction-Oxidation Plant (REDOX) About Us About Hanford Cleanup Hanford ... and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage ...

  16. Pre-In-Plant Training Webinar (Steam)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This pre-In-Plant training webinar for the Better Plants Program covers how to find energy savings in steam systems.

  17. Advanced Plant Pharmaceuticals Inc | Open Energy Information

    Open Energy Info (EERE)

    Inc. Place: New York, New York Product: String representation "Advanced Plant ... f its business." is too long. References: Advanced Plant Pharmaceuticals, Inc.1 This...

  18. Missouri Water Treatment Plant Upgraded

    Broader source: Energy.gov [DOE]

    The city of St. Peters, Missouri obtains its water from one of the best known rivers. Eight pumps from underground wells in the Mississippi River floodplain send water to a lime-softening water treatment plant where it is prepared for drinking water purposes. But because the demand for clean water exists at all times, the plant consumes noticeably large amounts of money and energy.

  19. COKEMASTER: Coke plant management system

    SciTech Connect (OSTI)

    Johanning, J.; Reinke, M.

    1996-12-31

    To keep coke utilization in ironmaking as competitive as possible, the potential to improve the economics of coke production has to be utilized. As one measure to meet this need of its customers, Krupp Koppers has expanded its existing ECOTROL computer system for battery heating control to a comprehensive Coke Plant Management System. Increased capacity utilization, lower energy consumption, stabilization of plant operation and ease of operation are the main targets.

  20. Researching power plant water recovery

    SciTech Connect (OSTI)

    2008-04-01

    A range of projects supported by NETl under the Innovations for Existing Plant Program are investigating modifications to power plant cooling systems for reducing water loss, and recovering water from the flue gas and the cooling tower. This paper discusses two technologies showing particular promise condense water that is typically lost to evaporation, SPX technologies' Air2Air{sup trademark} condenses water from a cooling tower, while Lehigh University's process condenses water and acid in flue gas. 3 figs.

  1. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Fred D. Brent; Lalit Shah; Earl Berry; Charles H. Schrader; John Anderson; J. Erwin; Matthew G. Banks; Terry L. Ullman

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). Phase II RD&T Task 2.6 identified as potential technical risks to the EECP the fuel/engine performance and emissions of the F-T diesel fuel products. Hydrotreating the neat F-T diesel product reduces potentially reactive olefins, oxygenates, and acids levels

  2. Manhattan Project: Enter the Army, 1942

    Office of Scientific and Technical Information (OSTI)

    The decision to proceed with planning for the production of enriched uranium and of ... procurement, engineering design, and site selection to the Corps of Engineers and to ...

  3. Power & Energyfrom an Army Ground Vehicle Perspective

    Broader source: Energy.gov [DOE]

    2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C.

  4. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    23 June 2016 Ozark Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Rehabilitation of the Ozark Powerhouse to include replacement of five turbines, rehabilitation of all cranes, rehab of water Treatment, and misc aux systems * Current Project Cost: $130.7 M * Current Turbine Contract Amount: $105.0 M * Anticipated Completion Date: July 2018 Ozark Scope, Cost and Schedule BUILDING STRONG ® Ozark Funding Status Ozark Rehab Project Estimate $130.7M Cranes, Gates, Generator

  5. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22 June 2016 Webbers Falls Powerhouse Major Rehabilitation BUILDING STRONG ® * Project Scope: Replace three turbines, rewind three generators and rehabilitate all cranes, tailrace and intake gates and bulkheads. * Total Project cost, including turbines, generator, gates, cranes, governors and misc: $87.6M ($82.8M customer funded) * Turbine Contract Awarded: February 2008 * Original Awarded Turbine Contract Amount: $39.3M * Current Turbine Contract Amount: $54.88M * Current Required Completion

  6. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Station Service Generators Southwestern Federal Hydropower Council USACE District Office, Kansas City June 22, 2016 Hydroelectric Design Center BUILDING STRONG ® 2 Outline 1. Station Service System 2. Sources 3. Benefits and Alternatives 4. Advantages of SS Generator 5. Comparison of Alternatives 6. Summary BUILDING STRONG ® 3 Outline 1. Station Service System ► Definition ► Components ► Design Goals 2. Sources 3. Benefits and Alternatives 4. Advantages of SS Generator 5. Comparison of

  7. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Harry S. Truman Dam Dissolved Oxygen Working Group Presenter BUILDING STRONG ® * May 29, 2013 fish kill in the tailrace and dead channel below Truman Dam. * August 26, 2013 fish kill in unit 5 draft tube after emergency shut down. * April 22, 2014 violation letter from DNR for 2013 fish kills. * March 22, 2015 Environmental Protection Specialist Hired. * June 8, 2015 Fish Kill Meeting at Jefferson City, established a need for a work group. Background 2 BUILDING STRONG ® DO Work Group Members

  8. US Army Corps of Engineers BUILDING STRONG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clarence Cannon Dam & Mark Twain Lake Dissolved Oxygen Update USACE St. Louis District Clarence Cannon Dam & Mark Twain Lake 23 June 2016 BUILDING STRONG ® Operational Objective  Maintain D.O. concentrations in the re- regulation pool at 5 milligrams per liter or greater as much as possible.  D.O. monitoring program and plan is a cooperative effort between MVS, Missouri Dept. of Conservation, Missouri Dept. Natural Resources and SWPA BUILDING STRONG ® Operational Objective 

  9. The VA's sorry, the army's silent

    SciTech Connect (OSTI)

    Freeman, K.

    1993-03-01

    Fifty years after the fact, the U.S. government is slowly moving to compensate World War II victims of mustard gas tests. Although the U.S. Department of Veterans attests to readiness to compensate the U.S. servicemen, a fog of military secrecy still makes the veteran's fight for recognition and compensation far from over. The Florida veterans, like most of the others, had been unable to get disability benefits because their service records did not document their participation in the secret tests and did not list the chemicals to which they had been exposed.

  10. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  11. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Charles Benham; Mark Bohn; John Anderson; Earl Berry; Fred Brent; Ming He; Randy Roberts; Lalit Shah; Marjan Roos

    2003-09-15

    The 1999 U. S. Department of Energy (DOE) award to Texaco Energy Systems Inc. (presently Texaco Energy Systems LLC, a subsidiary of ChevronTexaco) was made to provide a Preliminary Engineering Design of an Early Entrance Coproduction Plant (EECP). Since the award presentation, work has been undertaken to achieve an economical concept design that makes strides toward the DOE Vision 21 goal. The objective of the EECP is to convert coal and/or petroleum coke to electric power plus transportation fuels, chemicals and useful utilities such as steam. The use of petroleum coke was added as a fuel to reduce the cost of feedstock and also to increase the probability of commercial implementation of the EECP concept. This objective has been pursued in a three phase effort through the partnership of the DOE with prime contractor Texaco Energy Systems LLC and subcontractors General Electric (GE), Praxair, and Kellogg Brown and Root (KBR). ChevronTexaco is providing gasification technology and Rentech's Fischer-Tropsch technology that has been developed for non-natural gas feed sources. GE is providing gas turbine technology for the combustion of low energy content gas. Praxair is providing air separation technology, and KBR is providing engineering to integrate the facility. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. Phase I Preliminary Concept Report was completed in 2000. The Phase I Preliminary Concept Report was prepared based on making

  12. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    John Anderson; Mark Anselmo; Earl Berry; Mark Bohn; Ming He; Charles H. Schrader; Lalit Shah; Donald Todd; Robert Schavey

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to its detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC (TES) (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR). The work was under cooperative agreements with the U.S. Department of Energy (DOE). TES is providing the gasification technology and the Fischer-Tropsch (F-T) technology developed by Rentech Inc., GE is providing the combustion turbine technology, Praxair is providing the air separation technology, and KBR is providing overall engineering. Each of the EECP's subsystems was assessed for technical risks and barriers in Phase I. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified catalyst/wax separation as a potential technical and economic risk. To mitigate risks to the proposed EECP concept, Phase II RD&T included tests for

  13. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Abdalla H. Ali; Raj Kamarthi; John H. Anderson; Earl R. Berry; Charles H. Schrader; Lalit S. Shah

    2003-04-16

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I the team identified the integration of the water produced in the F-T synthesis section with the gasification section as an area of potential synergy. By utilizing the F-T water in the petroleum coke slurry for the gasifier, the EECP can eliminate a potential waste stream and reduce capital costs. There is a low technical risk for this synergy, however, the economic risk, particularly in regards to the water, can be high. The economic costs include the costs

  14. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    John Anderson; Mark Anselmo; Earl Berry; Mark Bohn; Roko Bujas; Ming He; Ken Kwik; Charles H. Schrader; Lalit Shah; Dennis Slater; Donald Todd; Don Wall

    2003-08-21

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC (TES), a subsidiary of ChevronTexaco, General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc. GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified catalyst/wax separation as a potential technical and economic risk. To mitigate risks to the proposed EECP, Phase II RD&T included tests of an alternative (to Rentech's Dynamic Settler) primary catalyst/wax separation device and

  15. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Randy Roberts

    2003-04-25

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using petroleum coke and ChevronTexaco's proprietary gasification technology. The objective of Phase I was to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC. (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). ChevronTexaco is providing gasification technology and Fischer-Tropsch technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified F-T reactor scale-up as a potential technical risk. The objective of Task 2.3 was to confirm engineering models that allow scale-up to commercial slurry phase bubble column (SPBC) reactors operating in the churn-turbulent flow regime. In

  16. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    John H. Anderson; Charles Benham; Earl R. Berry; Ming He; Charles H. Schrader; Lalit S. Shah; O.O. Omatete; T.D. Burchell

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I the team identified several potential methods to reduce or minimize the environmental impact of the proposed EECP. The EECP Project Team identified F-T catalyst disposal, beneficial gasifier slag usage (other than landfill), and carbon dioxide recovery for the gas turbine exhaust for study under this task. Successfully completing the Task 2.10 RD&T provides additional opportunities for the EECP to meet the

  17. Waste Treatment Plant - 12508

    SciTech Connect (OSTI)

    Harp, Benton; Olds, Erik

    2012-07-01

    The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium

  18. Dynamic Simulation Nuclear Power Plants

    Energy Science and Technology Software Center (OSTI)

    1992-03-03

    DSNP (Dynamic Simulator for Nuclear Power-Plants) is a system of programs and data files by which a nuclear power plant, or part thereof, can be simulated. The acronym DSNP is used interchangeably for the DSNP language, the DSNP libraries, the DSNP precompiler, and the DSNP document generator. The DSNP language is a special-purpose, block-oriented, digital-simulation language developed to facilitate the preparation of dynamic simulations of a large variety of nuclear power plants. It is amore » user-oriented language that permits the user to prepare simulation programs directly from power plant block diagrams and flow charts by recognizing the symbolic DSNP statements for the appropriate physical components and listing these statements in a logical sequence according to the flow of physical properties in the simulated power plant. Physical components of nuclear power plants are represented by functional blocks, or modules. Many of the more complex components are represented by several modules. The nuclear reactor, for example, has a kinetic module, a power distribution module, a feedback module, a thermodynamic module, a hydraulic module, and a radioactive heat decay module. These modules are stored in DSNP libraries in the form of a DSNP subroutine or function, a block of statements, a macro, or a combination of the above. Basic functional blocks such as integrators, pipes, function generators, connectors, and many auxiliary functions representing properties of materials used in nuclear power plants are also available. The DSNP precompiler analyzes the DSNP simulation program, performs the appropriate translations, inserts the requested modules from the library, links these modules together, searches necessary data files, and produces a simulation program in FORTRAN.« less

  19. EARLY ENTRANCE COPRODUCTION PLANT

    SciTech Connect (OSTI)

    Abdalla H. Ali; John H. Anderson; Earl R. Berry; Charles H. Schrader; Lalit S. Shah

    2003-04-16

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems were assessed for technical risks and barriers. A plan was identified to mitigate the identified risks (Phase II RD&T Plan, October 2000). The RD&T Plan identified petroleum coke characteristics as a potential technical risk. The composition of petroleum coke varies from one refinery to another. Petroleum coke characteristics are a function of the crude oil slate available at the refinery and the coker operating parameters. The specific

  20. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  1. Biochemical Conversion Pilot Plant (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    This fact sheet provides information about Biochemical Conversion Pilot Plant capabilities and resources at NREL.

  2. Waste Treatment Plant Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Project Waste Treatment Plant Project Presentation from the 2015 DOE National Cleanup Workshop by Peggy McCullough, Project Manager-WTP, Bechtel National. Waste Treatment Plant Project (669.27 KB) More Documents & Publications Waste Treatment Plant and Tank Farm Program Managing Large Capital Projects EIS-0391: Draft Environmental Impact Statement

  3. Method of identifying plant pathogen tolerance

    DOE Patents [OSTI]

    Ecker, Joseph R.; Staskawicz, Brian J.; Bent, Andrew F.; Innes, Roger W.

    1997-10-07

    A process for identifying a plant having disease tolerance comprising administering to a plant an inhibitory amount of ethylene and screening for ethylene insensitivity, thereby identifying a disease tolerant plant, is described. Plants identified by the foregoing process are also described.

  4. Method of identifying plant pathogen tolerance

    DOE Patents [OSTI]

    Ecker, J.R.; Staskawicz, B.J.; Bent, A.F.; Innes, R.W.

    1997-10-07

    A process for identifying a plant having disease tolerance comprising administering to a plant an inhibitory amount of ethylene and screening for ethylene insensitivity, thereby identifying a disease tolerant plant, is described. Plants identified by the foregoing process are also described. 7 figs.

  5. State power plant productivity programs

    SciTech Connect (OSTI)

    Not Available

    1981-02-01

    The findings of a working group formed to review the status of efforts by utilities and utility regulators to increase the availability and reliability of generating units are presented. Representatives from nine state regulatory agencies, NRRI, and DOE, participated on the Working Group. The Federal government has been working cooperatively with utilities, utility organizations, and with regulators to encourage and facilitate improvements in power plant productivity. Cooperative projects undertaken with regulatory and energy commissions in California, Illinois, New York, Ohio, Texas, North Carolina and Mighigan are described. Following initiation of these cooperative projects, DOE funded a survey to determine which states were explicitly addressing power plant productivity through the regulatory process. The Working Group was formed following completion of this survey. The Working Group emphasized the need for those power plant productivity improvements which are cost effective. The cost effectiveness of proposed availability improvement projects should be determined within the context of opportunities for operating and capital improvements available to an entire utility. The Working Group also identified the need for: allowing for plant designs that have a higher construction cost, but are also more reliable; allowing for recovery and reducing recovery lags for productivity-related capital expenditures; identifying and reducing disincentives in the regulatory process; ascertaining that utilities have sufficient money available to undertake timely maintenance; and support of EPRI and NERC to develop a relevant and accurate national data base. The DOE views these as extremely important aspects of any regulatory program to improve power plant productivity.

  6. Expression of multiple proteins in transgenic plants

    DOE Patents [OSTI]

    Vierstra, Richard D.; Walker, Joseph M.

    2002-01-01

    A method is disclosed for the production of multiple proteins in transgenic plants. A DNA construct for introduction into plants includes a provision to express a fusion protein of two proteins of interest joined by a linking domain including plant ubiquitin. When the fusion protein is produced in the cells of a transgenic plant transformed with the DNA construction, native enzymes present in plant cells cleave the fusion protein to release both proteins of interest into the cells of the transgenic plant. Since the proteins are produced from the same fusion protein, the initial quantities of the proteins in the cells of the plant are approximately equal.

  7. Plants having modified response to ethylene

    DOE Patents [OSTI]

    Meyerowitz, Elliot M.; Chang, Caren; Bleecker, Anthony B.

    1998-01-01

    The invention includes transformed plants having at least one cell transformed with a modified ETR nucleic acid. Such plants have a phenotype characterized by a decrease in the response of at least one transformed plant cell to ethylene as compared to a plant not containing the transformed plant cell. Tissue and/or temporal specificity for expression of the modified ETR nucleic acid is controlled by selecting appropriate expression regulation sequences to target the location and/or time of expression of the transformed nucleic acid. The plants are made by transforming at least one plant cell with an appropriate modified ETR nucleic acid, regenerating plants from one or more of the transformed plant cells and selecting at least one plant having the desired phenotype.

  8. Plants having modified response to ethylene

    DOE Patents [OSTI]

    Meyerowitz, E.M.; Chang, C.; Bleecker, A.B.

    1997-11-18

    The invention includes transformed plants having at least one cell transformed with a modified ETR nucleic acid. Such plants have a phenotype characterized by a decrease in the response of at least one transformed plant cell to ethylene as compared to a plant not containing the transformed plant cell. Tissue and/or temporal specificity for expression of the modified ETR nucleic acid is controlled by selecting appropriate expression regulation sequences to target the location and/or time of expression of the transformed nucleic acid. The plants are made by transforming at least one plant cell with an appropriate modified ETR nucleic acid, regenerating plants from one or more of the transformed plant cells and selecting at least one plant having the desired phenotype. 31 figs.

  9. Plants having modified response to ethylene

    DOE Patents [OSTI]

    Meyerowitz, Elliott M.; Chang, Caren; Bleecker, Anthony B.

    1997-01-01

    The invention includes transformed plants having at least one cell transformed with a modified ETR nucleic acid. Such plants have a phenotype characterized by a decrease in the response of at least one transformed plant cell to ethylene as compared to a plant not containing the transformed plant cell. Tissue and/or temporal specificity for expression of the modified ETR nucleic acid is controlled by selecting appropriate expression regulation sequences to target the location and/or time of expression of the transformed nucleic acid. The plants are made by transforming at least one plant cell with an appropriate modified ETR nucleic acid, regenerating plants from one or more of the transformed plant cells and selecting at least one plant having the desired phenotype.

  10. Plants having modified response to ethylene

    DOE Patents [OSTI]

    Meyerowitz, E.M.; Chang, C.; Bleecker, A.B.

    1998-10-20

    The invention includes transformed plants having at least one cell transformed with a modified ETR nucleic acid. Such plants have a phenotype characterized by a decrease in the response of at least one transformed plant cell to ethylene as compared to a plant not containing the transformed plant cell. Tissue and/or temporal specificity for expression of the modified ETR nucleic acid is controlled by selecting appropriate expression regulation sequences to target the location and/or time of expression of the transformed nucleic acid. The plants are made by transforming at least one plant cell with an appropriate modified ETR nucleic acid, regenerating plants from one or more of the transformed plant cells and selecting at least one plant having the desired phenotype. 67 figs.

  11. Westinghouse ICF power plant study

    SciTech Connect (OSTI)

    Sucov, E. W.

    1980-10-01

    In this study, two different electric power plants for the production of about 1000 MWe which were based on a CO/sub 2/ laser driver and on a heavy ion driver have been developed and analyzed. The purposes of this study were: (1) to examine in a self consistent way the technological and institutional problems that need to be confronted and solved in order to produce commercially competitive electricity in the 2020 time frame from an inertial fusion reactor, and (2) to compare, on a common basis, the consequences of using two different drivers to initiate the DT fuel pellet explosions. Analytic descriptions of size/performance/cost relationships for each of the subsystems comprising the power plant have been combined into an overall computer code which models the entire plant. This overall model has been used to conduct trade studies which examine the consequences of varying critical design values around the reference point.

  12. Venezuelan plant completes instrument upgrade

    SciTech Connect (OSTI)

    Martinez, H.; Garcia, C.O.

    1996-07-22

    The Lamarliquido LPG plant, offshore Lake Maracaibo, Venezuela, has received a major upgrade to its control system after 25 years of pneumatic instrumentation. The plant is now operating fully remote from a new central control room with a maximum production of 5,500 b/d, expected to go to 6,600 b/d. The phases of the project included installation and integration of four control systems: distributed control system; fire prevention, detection, and control system; refrigeration process turbocompressor control system; and emergency shutdown system. The paper describes the 1960s vintage instrumentation, the modernization objectives and phases, the distributed control system, the fire control system, gas and fire detection, the turbocompressor system, emergency shutdown system, and plant shutdown logic.

  13. Plant-wide Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant-wide Systems Plant-wide Systems Improving the energy efficiency of plant-wide systems can lead to significant savings. Use the software tools, training, and publications listed below to improve performance and save energy. Plant Wide Tools Tools to manage energy DOE eGuide for ISO 50001 DOE eGuide Lite Energy Performance Indicator Plant-Wide Case Studies Alcoa: C-Suite Participation in Energy Efficiency Increases Accountability and Staff Engagement Throughout the Organization Success

  14. Reducing Plant Lignin for Cheaper Biofuels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reducing Plant Lignin for Cheaper Biofuels Reducing Plant Lignin for Cheaper Biofuels Print Wednesday, 04 May 2016 12:11 Lignin is a polymer that permeates plant cell walls. Although beneficial to the plant, the lignin must be chemically broken down in a costly pretreatment step before the sugars inside can be released and fermented into useful chemicals and fuels. Previous attempts to silence lignin-producing genes resulted in weak plants with a lower sugar yield. In this work, researchers

  15. Waste Treatment & Immobilization Plant - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Treatment & Immobilization Plant Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 242-A Evaporator 222-S Laboratory Newsroom Contracts & Procurements Contact ORP Waste Treatment & Immobilization Plant Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Waste Treatment Plant Overview Waste Treatment and Immobilization Plant Background Information The Hanford Site, located in

  16. Waste Isolation Pilot Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant Waste Isolation Pilot Plant Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations Waste Isolation Pilot Plant | June 2007 Salt Disposal Investigations The mission of the Waste Isolation Pilot Plant site is to provide permanent, underground disposal of TRU and TRU-mixed wastes (wastes that also have hazardous chemical components). TRU waste consists of clothing, tools, and debris left from the research and production of nuclear weapons. TRU waste is

  17. Ohio Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Ohio nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Davis Besse Unit 1",894,"5,185",32.8,"FirstEnergy Nuclear Operating Company" "Perry Unit 1","1,240","10,620",67.2,"FirstEnergy Nuclear Operating Company" "2

  18. Pennsylvania Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Pennsylvania nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Beaver Valley Unit 1, Unit 2","1,777","14,994",19.3,"FirstEnergy Nuclear Operating Company" "Limerick Unit 1, Unit 2","2,264","18,926",24.3,"Exelon

  19. Michigan Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Donald C Cook Unit 1, Unit 2","2,069","15,646",52.8,"Indiana Michigan Power Co" "Fermi Unit 2","1,085","7,738",26.1,"Detroit Edison Co" "Palisades Unit

  20. Minnesota Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Minnesota nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Monticello Unit 1",554,"4,695",34.8,"Northern States Power Co - Minnesota" "Prairie Island Unit 1, Unit 2","1,040","8,783",65.2,"Northern States Power Co -

  1. Alabama Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Browns Ferry Unit 1, Unit 2, Unit 3","3,309","24,771",65.3,"Tennessee Valley Authority" "Joseph M Farley Unit 1, Unit 2","1,734","13,170",34.7,"Alabama Power

  2. California Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    California nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Diablo Canyon Unit 1, Unit 2","2,240","18,430",57.2,"Pacific Gas & Electric Co" "San Onofre Nuclear Generating Station Unit 2, Unit

  3. Florida Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Florida nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Crystal River Unit 3",860,0,"--","Progress Energy Florida Inc" "St Lucie Unit 1, Unit 2","1,678","12,630",52.8,"Florida Power & Light Co" "Turkey Point

  4. Illinois Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Braidwood Generation Station Unit 1, Unit 2","2,330","19,200",20.0,"Exelon Nuclear" "Byron Generating Station Unit 1, Unit 2","2,300","19,856",20.6,"Exelon

  5. Texas Nuclear Profile - Power Plants

    U.S. Energy Information Administration (EIA) Indexed Site

    nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Comanche Peak Unit 1, Unit 2","2,406","20,208",48.9,"Luminant Generation Company LLC" "South Texas Project Unit 1, Unit 2","2,560","21,127",51.1,"STP Nuclear

  6. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility study (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.

  7. Shell structures for biogas plants

    SciTech Connect (OSTI)

    Sasse, L.

    1982-01-01

    The shell structures designed for biogas plants of the fixed-dome type by the Bremen Overseas Research and Development Association are described. Biogas digesters of the design described have been successfully tested in Rwanda and India without structural or contractural problems.

  8. Advanced nuclear plant control complex

    DOE Patents [OSTI]

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  9. Methodology for Scaling Fusion Power Plant Availability

    SciTech Connect (OSTI)

    Lester M. Waganer

    2011-01-04

    Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, "Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the "teething" problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated "mature" subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

  10. Glutathione-S-conjugate transport in plants

    DOE Patents [OSTI]

    Rea, Philip A.; Lu, Yu-Ping; Li, Ze-Sheng

    2000-01-01

    The invention includes an isolated DNA encoding a plant GS-X pump polypeptide and an isolated preparation of a plant GS-X pump polypeptide. Also included is an isolated preparation of a nucleic acid which is antisense in orientation to a portion or all of a plant GS-X pump gene. The invention also includes a cells, vectors and transgenic plants having an isolated DNA encoding a plant GS-X pump and methods of use thereof. In addition, the invention relates to plant GS-X pump promoter sequences and the uses thereof.

  11. Methodology and application of surrogate plant PRA analysis to the Rancho Seco Power Plant: Final report

    SciTech Connect (OSTI)

    Gore, B.F.; Huenefeld, J.C.

    1987-07-01

    This report presents the development and the first application of generic probabilistic risk assessment (PRA) information for identifying systems and components important to public risk at nuclear power plants lacking plant-specific PRAs. A methodology is presented for using the results of PRAs for similar (surrogate) plants, along with plant-specific information about the plant of interest and the surrogate plants, to infer important failure modes for systems of the plant of interest. This methodology, and the rationale on which it is based, is presented in the context of its application to the Rancho Seco plant. The Rancho Seco plant has been analyzed using PRA information from two surrogate plants. This analysis has been used to guide development of considerable plant-specific information about Rancho Seco systems and components important to minimizing public risk, which is also presented herein.

  12. DOE - NNSA/NFO -- Plants and Animals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plants & Animals NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Plants and Animals Wild Horses at the NNSS Because of its physical ...

  13. Method to improve drought tolerance in plants

    DOE Patents [OSTI]

    Schroeder, Julian I.; Kwak, June Myoung

    2003-10-21

    A method to increase drought resistance in plants is provided. The method comprises inhibiting or disabling inward-rectifying K.sup.+ (K.sup.+.sub.in) channels in the stomatal guard cells of the plant.

  14. Solar Plants Blazek sro | Open Energy Information

    Open Energy Info (EERE)

    Plants Blazek sro Jump to: navigation, search Name: Solar Plants Blazek sro Place: Kladno 4, Czech Republic Zip: 272 04 Product: Czech family controlled company operating a 0.75MW...

  15. ,"U.S. Natural Gas Plant Processing"

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","U.S. Natural Gas Plant Processing",3,"Annual",2013,"6301930" ... to Contents","Data 1: U.S. Natural Gas Plant Processing" "Sourcekey","NA1180NUS2","NA...

  16. Tracking New Coal-Fired Power Plants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tracking New Coal-Fired Power Plants (data update 12132010) January 14, 2011 b National ... generation additions in the U.S. and coal-fired power plant activity in China. ...

  17. Wave-operated power plant

    SciTech Connect (OSTI)

    Ghesquiere, H.

    1980-08-12

    This wave-operated power plant comprises a perforated caisson breakwater in which propellers, or turbines, are mounted in the perforations or openings and drives hydraulic pumps connected thereto, which in turn drives a hydraulic motor coupled to an electric generator. One-way flap valves are mounted in the openings. Some of said flap valves allow the rushing waves to enter the caisson, while the other flap valves allow the water to flow out of the caisson.

  18. Waste Isolation Pilot Plant Activites

    Office of Environmental Management (EM)

    DENVER, CO WASTE ISOLATION PILOT PLANT ACTIVITIES ACTIVITIES O.W. EATON MANAGER, EXTERNAL EMERGENCY MANAGEMENT OPENING OF NEW ROUTES COMPLIANCE WITH PUBLIC LAW 102 579 WIPP LANDWITHDRAWL 102-579 WIPP LANDWITHDRAWL ACT OF 1992 1082 EMERGENCY PERSONNEL TRAINED IN 2010 *MERRTT 1082 EMERGENCY PERSONNEL TRAINED IN 2010 MERRTT *INCIDENT COMMAND SYSTEM *HOSPITAL PREPAREDNESS *HOSPITAL PREPAREDNESS *MEDICAL EXAMINER DISPATCHER (BETA) *DISPATCHER (BETA) RADIOLOGICAL TRAINING RADIOLOGICAL TRAINING FOR FOR

  19. DOE - NNSA/NFO -- Photo Library Plants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plants NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Photo Library - Plants The Nevada National Security Site boasts more than 750 varieties of plants. About 67 families of plants are represented, however, one-third of them belong to just three families: sunflowers, grasses and buckwheats. Instructions: Click the photograph THUMBNAIL to view the photograph details. Click the Category, Number, or Date table header links to sort the information Thumbnail Category Number Date

  20. Multiple soil nutrient competition between plants, microbes,...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Multiple soil nutrient competition between plants, microbes, and mineral surfaces: model development, parameterization, and example applications in several...

  1. Los Alamos plants willows for flood recovery

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plants willows Los Alamos plants willows for flood recovery The Laboratory's Corrective Actions Program (CAP) planted nearly 10,000 willows to help preserve the Pueblo Canyon wetland after damage from September 2013 floods. June 18, 2014 In a flood recovery effort designed to stop further erosion in Pueblo Canyon, in April, Los Alamos planted nearly 10,000 willows along the stream banks surrounding the wetland. In a flood recovery effort designed to stop further erosion in Pueblo Canyon, Los

  2. Types of Hydropower Plants | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plants Types of Hydropower Plants There are three types of hydropower facilities: impoundment, diversion, and pumped storage. Some hydropower plants use dams and some do not. The images below show both types of hydropower plants. Many dams were built for other purposes and hydropower was added later. In the United States, there are about 80,000 dams of which only 2,400 produce power. The other dams are for recreation, stock/farm ponds, flood control, water supply, and irrigation. Hydropower

  3. Waste Isolation Pilot Plant | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Isolation Pilot Plant Waste Isolation Pilot Plant Operators prepare drums of contact-handled transuranic waste for loading into transportation containers Operators prepare drums of contact-handled transuranic waste for loading into transportation containers A transuranic waste shipment travels on an approved shipping route to the Waste Isolation Pilot Plant A transuranic waste shipment travels on an approved shipping route to the Waste Isolation Pilot Plant Operators prepare drums of

  4. CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

    Office of Legacy Management (LM)

    WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects ..-.. --__- _".-.-l--_--l -_._ _- --- ~~~. . ..~ CONTENTS Page - - I NTRODUCTI ON 1 Purpose 1 Docket Contents 1 Exhibit I: Summary of Activities at Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania

  5. Progress Continues at Plutonium Finishing Plant | Department of Energy

    Office of Environmental Management (EM)

    at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant August 15, 2016 - 12:20pm Addthis Progress Continues at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant Progress Continues at Plutonium Finishing Plant RICHLAND, Wash. - With demolition of the Plutonium Finishing Plant (PFP) on the Hanford Site rapidly

  6. Engineered plant biomass feedstock particles

    DOE Patents [OSTI]

    Dooley, James H.; Lanning, David N.; Broderick, Thomas F.

    2012-04-17

    A new class of plant biomass feedstock particles characterized by consistent piece size and shape uniformity, high skeletal surface area, and good flow properties. The particles of plant biomass material having fibers aligned in a grain are characterized by a length dimension (L) aligned substantially parallel to the grain and defining a substantially uniform distance along the grain, a width dimension (W) normal to L and aligned cross grain, and a height dimension (H) normal to W and L. In particular, the L.times.H dimensions define a pair of substantially parallel side surfaces characterized by substantially intact longitudinally arrayed fibers, the W.times.H dimensions define a pair of substantially parallel end surfaces characterized by crosscut fibers and end checking between fibers, and the L.times.W dimensions define a pair of substantially parallel top and bottom surfaces. The L.times.W surfaces of particles with L/H dimension ratios of 4:1 or less are further elaborated by surface checking between longitudinally arrayed fibers. The length dimension L is preferably aligned within 30.degree. parallel to the grain, and more preferably within 10.degree. parallel to the grain. The plant biomass material is preferably selected from among wood, agricultural crop residues, plantation grasses, hemp, bagasse, and bamboo.

  7. Volvo Trucks Manufacturing Plant in Virginia

    Broader source: Energy.gov [DOE]

    Volvo Group North America’s 1.6-million-square-foot New River Valley Plant in Dublin, Virginia, is the company’s largest truck manufacturing plant in the world. The company has implemented many energy savings solutions as part of the Better Buildings, Better Plants Challenge.

  8. Transgenic plants with altered senescence characteristics

    DOE Patents [OSTI]

    Amasino, Richard M.; Gan, Susheng; Noh, Yoo-Sun

    2002-03-19

    The identification of senescence-specific promoters from plants is described. Using information from the first senescence-specific promoter, SAG12 from Arabidopsis, other homologous promoters from another plant have been identified. Such promoters may be used to delay senescence in commercially important plants.

  9. Secondary succession: insect-plant relationships

    SciTech Connect (OSTI)

    Brown, V.K.

    1984-12-01

    Botanists have dominated the study of secondary succession, and as a result, models and theories have focused on plants. Recent work, however, has revealed several complex relationships between plants and insects during succession, including adaptations of life-cycle strategies. Furthermore, insect herbivores play a key role in the course and rate of plant succession.

  10. Olinda Landfill Gas Recovery Plant Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Olinda Landfill Gas Recovery Plant Biomass Facility Jump to: navigation, search Name Olinda Landfill Gas Recovery Plant Biomass Facility Facility Olinda Landfill Gas Recovery Plant...

  11. Sauder Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Sauder Power Plant Biomass Facility Jump to: navigation, search Name Sauder Power Plant Biomass Facility Facility Sauder Power Plant Sector Biomass Location Fulton County, Ohio...

  12. Rhodia Houston Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Rhodia Houston Plant Biomass Facility Jump to: navigation, search Name Rhodia Houston Plant Biomass Facility Facility Rhodia Houston Plant Sector Biomass Facility Type Non-Fossil...

  13. Nvision.Solar - Ravnishte Solar PV Plant | Open Energy Information

    Open Energy Info (EERE)

    Solar - Ravnishte Solar PV Plant Jump to: navigation, search Name Nvision.Solar - Ravnishte Solar PV Plant Facility Ravishte roof and facade mounted solar power plant Sector Solar...

  14. Don A. Cambell Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Geothermal Region Plant Information Facility Type Binary Owner Ormat Developer Ormat Energy Purchaser Ormat Commercial Online Date 2013 Power Plant Data Type of Plant Number...

  15. Kizildere I Geothermal Pwer Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant Information Facility Type Triple Flash Cycle Owner Zorlu Enerji Developer MTA Energy Purchaser TEDAS Commercial Online Date 1984 Power Plant Data Type of Plant Number...

  16. Cove Fort Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Plant Information Facility Type Binary Owner Enel Green Power Developer Enel Green Power Energy Purchaser Ormat Commercial Online Date 2013 Power Plant Data Type of Plant Number...

  17. Southside Water Reclamation Plant Biomass Facility | Open Energy...

    Open Energy Info (EERE)

    Water Reclamation Plant Biomass Facility Jump to: navigation, search Name Southside Water Reclamation Plant Biomass Facility Facility Southside Water Reclamation Plant Sector...

  18. American Canyon Power Plant Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    Canyon Power Plant Biomass Facility Jump to: navigation, search Name American Canyon Power Plant Biomass Facility Facility American Canyon Power Plant Sector Biomass Facility Type...

  19. Enhancing Plant Growth and Stress Tolerance through Use of Fungi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enhancing Plant Growth and Stress Tolerance through Use of Fungi and Bacteria that Comprise Plant Microbiomes Enhancing Plant Growth and Stress Tolerance through Use of Fungi and ...

  20. Waste Isolation Pilot Plant Activites | Department of Energy

    Office of Environmental Management (EM)

    Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites Waste Isolation Pilot Plant Activites (1.08 MB) More Documents & Publications EIS-0026: 2010 Annual Mitigation ...

  1. Methods of saccharification of polysaccharides in plants

    DOE Patents [OSTI]

    Howard, John; Fake, Gina

    2014-04-29

    Saccharification of polysaccharides of plants is provided, where release of fermentable sugars from cellulose is obtained by adding plant tissue composition. Production of glucose is obtained without the need to add additional .beta.-glucosidase. Adding plant tissue composition to a process using a cellulose degrading composition to degrade cellulose results in an increase in the production of fermentable sugars compared to a process in which plant tissue composition is not added. Using plant tissue composition in a process using a cellulose degrading enzyme composition to degrade cellulose results in decrease in the amount of cellulose degrading enzyme composition or exogenously applied cellulase required to produce fermentable sugars.

  2. Life extension system for fossil power plants

    SciTech Connect (OSTI)

    Isreb, M.

    1996-11-01

    A general, multi-disciplinary life extension system for new and existing power plants has been absent in the literature. The present paper presents a general, multi-disciplinary life extension system for new and existing fossil power plants. The paper formulates the optimization problem framework for plants` components. The paper discusses the framework of the iterative process, objective functions, plant components, life extension constraints, new life or remnant life parameters and optimization techniques. Other system attributes discussed in the paper include: design invariant parameters, relationships between plant components and objective functions and a strategy for system sizing and simulation.

  3. BWR plant analyzer development at BNL

    SciTech Connect (OSTI)

    Cheng, H.S.; Wulff, W.; Mallen, A.N.; Lekach, S.V.; Stritar, A.; Cerbone, R.J.

    1985-01-01

    Advanced technology for high-speed interactive nuclear power plant simulations is of great value for timely resolution of safety issues, for plant monitoring, and for computer-aided emergency responses to an accident. Presented is the methodology employed at BNL to develop a BWR plant analyzer capable of simulating severe plant transients at much faster than real-time process speeds. Five modeling principles are established and a criterion is given for selecting numerical procedures and efficient computers to achieve the very high simulation speeds. Typical results are shown to demonstrate the modeling fidelity of the BWR plant analyzer.

  4. Kansas City Plant Celebrates Safety Milestone

    ScienceCinema (OSTI)

    None

    2010-09-01

    A gang of motorcycle riders arrived at the NNSA's Kansas City Plant on July 1 to help celebrate a significant safety achievement - working nearly five million hours, covering a one-year period without a lost-time injury. The bikers -- some of whom are plant employees -- represent Bikers Against Child Abuse, the local nonprofit selected to receive a $5,000 donation as part of the plant's safety achievement celebration. The organization was selected because it aligns with the plant's community outreach focus on Family Safety & Security and partnership with the plant's union members.

  5. Supercritical plants to come online in 2009

    SciTech Connect (OSTI)

    Spring, N.

    2009-07-15

    A trio of coal-fired power plants using supercritical technology set to enter service this year. These are: We Energies is Elm Road Generating Station in Wisconsin, a two-unit, 1,230 MW supercritical plant that will burn bituminous coal; a 750 MW supercritical coal-fired power plant at the Comanche Generating Station in Pueblo, Colo., the third unit at the site; and Luminant's Oak Grove plant in Texas which will consist of two supercritical, lignite-fueled power generation units. When complete, the plant will deliver about 1,6000 MW. Some details are given on each of these projects. 2 photos.

  6. Genomic Aspects of Research Involving Polyploid Plants

    SciTech Connect (OSTI)

    Yang, Xiaohan [ORNL; Ye, Chuyu [ORNL; Tschaplinski, Timothy J [ORNL; Wullschleger, Stan D [ORNL; Tuskan, Gerald A [ORNL

    2011-01-01

    Almost all extant plant species have spontaneously doubled their genomes at least once in their evolutionary histories, resulting in polyploidy which provided a rich genomic resource for evolutionary processes. Moreover, superior polyploid clones have been created during the process of crop domestication. Polyploid plants generated by evolutionary processes and/or crop domestication have been the intentional or serendipitous focus of research dealing with the dynamics and consequences of genome evolution. One of the new trends in genomics research is to create synthetic polyploid plants which provide materials for studying the initial genomic changes/responses immediately after polyploid formation. Polyploid plants are also used in functional genomics research to study gene expression in a complex genomic background. In this review, we summarize the recent progress in genomics research involving ancient, young, and synthetic polyploid plants, with a focus on genome size evolution, genomics diversity, genomic rearrangement, genetic and epigenetic changes in duplicated genes, gene discovery, and comparative genomics. Implications on plant sciences including evolution, functional genomics, and plant breeding are presented. It is anticipated that polyploids will be a regular subject of genomics research in the foreseeable future as the rapid advances in DNA sequencing technology create unprecedented opportunities for discovering and monitoring genomic and transcriptomic changes in polyploid plants. The fast accumulation of knowledge on polyploid formation, maintenance, and divergence at whole-genome and subgenome levels will not only help plant biologists understand how plants have evolved and diversified, but also assist plant breeders in designing new strategies for crop improvement.

  7. Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design. Volume 17. Plant section 2500 - Plant and Instrument Air

    SciTech Connect (OSTI)

    1981-05-01

    Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 17 which reports the design of Plant Section 2500 - Plant and Instrument Air. The plant and instrument air system is designed to provide dry, compressed air for a multitude of uses in plant operations and maintenance. A single centrifugal air compressor provides the total plant and instrument air requirements. An air drying system reduces the dew point of the plant and instrument air. Plant Section 2500 is designed to provide air at 100/sup 0/F and 100 psig. Both plant and instrument air are dried to a -40/sup 0/F dew point. Normal plant and instrument air requirements total 1430 standard cubic feet per minute.

  8. Proceedings of a Topical Meeting On Small Scale Geothermal Power Plants and Geothermal Power Plant Projects

    SciTech Connect (OSTI)

    1986-02-12

    These proceedings describe the workshop of the Topical Meeting on Small Scale Geothermal Power Plants and Geothermal Power Plant Projects. The projects covered include binary power plants, rotary separator, screw expander power plants, modular wellhead power plants, inflow turbines, and the EPRI hybrid power system. Active projects versus geothermal power projects were described. In addition, a simple approach to estimating effects of fluid deliverability on geothermal power cost is described starting on page 119. (DJE-2005)

  9. Gold Nanoparticles by Alfalfa Plants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jorge Gardea-Torresdey, University of Texas at El Paso In the well-known Greek legend the touch of King Midas would convert anything to metallic gold. Recently, a team working at SSRL lead by Professor Jorge Gardea-Torresdey from the University of Texas at El Paso have shown that ordinary alfalfa plants can accumulate very small particles (nanoparticles) of metallic gold (1). The best-known materials that contain nanoparticles of metallic gold are gold colloids. These lack the familiar metallic

  10. Field investigation of effectiveness of soil vapor extraction technology (September 1994). Final project report

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    A research project was undertaken to study the effectiveness of soil vapor extraction (SVE), an emerging technology for remediation of soils contaminated with volatile organic compounds (VOCs). As part of the project, two soil vapor extraction systems, Site D and Site G at the Twin Cities Army Ammunition Plant, New Brighton, Minnesota were selected for evaluation. The approach of the project was to gather and compare site information regarding residual soil concentrations before and after treatment, and obtain operational data to evaluate the performance of the systems. The residual levels of volatile organics before and after treatment are compared for magnitude and distribution. Operational data are analyzed to present the performance of the systems and the progression of treatment with time. Capital, operating and maintenance costs are presented. Results of the evaluation indicate that SVE has been effective in reducing the residual concentrations, generally by several orders of magnitude. In most cases, residual concentrations were nondetectable. Samples taken in silty clays and waste materials showed the hightest residual concentrations.

  11. Pennsylvania Manufacturing Plants Recognized as Leaders in Energy...

    Office of Environmental Management (EM)

    Superior Energy Performance Pennsylvania Manufacturing Plants Recognized as Leaders in Energy Management Pennsylvania Manufacturing Plants Recognized as Leaders in Energy ...

  12. Natural Gas Processing Plants in the United States: 2010 Update...

    Gasoline and Diesel Fuel Update (EIA)

    7. Natural Gas Processing Plants in Alaska, 2009 Figure 7. Natural Gas Processing Plants in Alaska, 2009...

  13. Hachijojima Geothermal Energy Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Hachijojima Geothermal Energy Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Hachijojima Geothermal Energy Power Plant General Information Name...

  14. Sabotage at Nuclear Power Plants

    SciTech Connect (OSTI)

    Purvis, James W.

    1999-07-21

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

  15. Better Plants Progress Update 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Better Plants Progress Update 2014 The 2014 Progress Update details Better Buildings, Better Plants Program accomplishments, including new partners, new initiatives, and energy and cost savings experienced by partners. Better Plants Progress Update 2014 (1.22 MB) More Documents & Publications Better Plants Progress Update Fall 2013 Better Plants Look Ahead Webinar: Presentation Slides Better Plants Two-Page Overview

  16. GEOTHERMAL POWER GENERATION PLANT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GEOTHERMAL POWER GENERATION PLANT GEOTHERMAL POWER GENERATION PLANT Project objectives: Drilling a deep geothermal well on the Oregon Institute of Technology campus, Klamath Falls, OR. Constructing a geothermal power plant on the Oregon Institute of Technology campus. analysis_lund_oit_power_generation.pdf (946.36 KB) More Documents & Publications Klamath and Lake Counties Agricultural Industrial Park Desert Peak EGS Project CanGEA Fifth Annual Geothermal Conference Presentation - Mapping

  17. Plant nitrogen regulatory P-PII genes

    DOE Patents [OSTI]

    Coruzzi, Gloria M.; Lam, Hon-Ming; Hsieh, Ming-Hsiun

    2001-01-01

    The present invention generally relates to plant nitrogen regulatory PII gene (hereinafter P-PII gene), a gene involved in regulating plant nitrogen metabolism. The invention provides P-PII nucleotide sequences, expression constructs comprising said nucleotide sequences, and host cells and plants having said constructs and, optionally expressing the P-PII gene from said constructs. The invention also provides substantially pure P-PII proteins. The P-PII nucleotide sequences and constructs of the

  18. Efficiency combined cycle power plant

    SciTech Connect (OSTI)

    Pavel, J.; Meyers, G.A.; Baldwin, T.S.

    1990-06-12

    This patent describes a method of operating a combined cycle power plant. It comprises: flowing exhaust gas from a combustion turbine through a heat recovery steam generator (HRSG); flowing feed water through an economizer section of the HRSG at a flow rate and providing heated feed water; flowing a first portion of the heated feed water through an evaporator section of the HRSG and producing saturated steam at a production rate, the flow rate of the feed water through the economizer section being greater than required to sustain the production rate of steam in the evaporator section; flowing fuel for the turbine through a heat exchanger; and, flowing a second portion of the heated feed water provided by the economizer section through the heat exchanger then to an inlet of the economizer section, thereby heating the fuel flowing through the heat exchanger.

  19. Milestones Keep DUF6 Plants Moving Ahead

    Broader source: Energy.gov [DOE]

    PADUCAH, Ky. – The depleted uranium hexafluoride (DUF6) conversion plants in Portsmouth, Ohio, and Paducah, Ky., celebrated two significant milestones this year.

  20. Darajat Geothermal Power Plant | Open Energy Information

    Open Energy Info (EERE)

    n":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Geothermal Resource Area Java - Darajat Geothermal Area Geothermal Region Sunda Volcanic Arc Plant Information Owner...