Powered by Deep Web Technologies
Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

ARM - Data Management and Documentation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationData Management and Documentation Plan DocumentationData Management and Documentation Plan Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Management and Documentation Plan Purpose This document describes datastream documentation requirements and standard formatting and naming protocols for both data users and the infrastructure who produce the data. Definitions Baseline Change Request (BCR): Used by the ARM Infrastructure as a process to provide configuration

2

ARM Science Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

ER-ARM-0402 ER-ARM-0402 Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program Thomas P. Ackerman, Lead Author Anthony D. Del Genio Gregory M. McFarquhar Robert G. Ellingson Peter J. Lamb Richard A. Ferrare Charles N. Long Steve A. Klein Johannes Verlinde October 2004 United States Department of Energy Office of Science, Office of Biological and Environmental Research Executive Summary The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative

3

Management Plan Management Plan  

E-Print Network (OSTI)

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

4

Planning Single-arm Manipulations with N-Arm Robots  

E-Print Network (OSTI)

Planning Single-arm Manipulations with N-Arm Robots Benjamin Cohen bcohen@seas.upenn.edu University@cs.cmu.edu Carnegie Mellon University Abstract--Many robotic systems are comprised of two or more arms. Such systems robotic arms. While the use of multiple arms increases the pro- ductivity of the system and extends

Guestrin, Carlos

5

DOE/SC-ARM-14-008 Data Management Facility Operations Plan NN...  

NLE Websites -- All DOE Office Websites (Extended Search)

or missing header information. This needs to be adjusted in order for the ARM ingest to process it. A mentordeveloper will be contacted when bad raw data are received by the DMF...

6

ARM - Lesson Plans: Ocean Currents  

NLE Websites -- All DOE Office Websites (Extended Search)

Ocean Currents Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global...

7

ARM - Lesson Plans: Global Warming  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans: Global Warming Objective The objective is to understand the enhanced greenhouse effect and the effects of global warming. Important Points to Understand If the...

8

ORISE: Asset Readiness Management System (ARMS)  

NLE Websites -- All DOE Office Websites (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

9

Light duty utility arm startup plan  

SciTech Connect

This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).

Barnes, G.A.

1998-09-01T23:59:59.000Z

10

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

11

Environmental Management System Plan  

E-Print Network (OSTI)

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

12

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

13

Factor-Guided Motion Planning for a Robot Arm Jaesik Choi and Eyal Amir  

E-Print Network (OSTI)

Factor-Guided Motion Planning for a Robot Arm Jaesik Choi and Eyal Amir Computer Science Department planning for robotic arms is important for real, physical world applications. The planning for arms planning for 2D arms. I. INTRODUCTION Robotic motion planning focuses on finding paths from one robot

Amir, Eyal

14

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network (OSTI)

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

15

ARM - Lesson Plans: Moving Water and Waves  

NLE Websites -- All DOE Office Websites (Extended Search)

Moving Water and Waves Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM...

16

Best Management Practice #1: Water Management Planning  

Energy.gov (U.S. Department of Energy (DOE))

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

17

ARM - Lesson Plans: Estimating Local Sea Level  

NLE Websites -- All DOE Office Websites (Extended Search)

Lesson Plans Lesson Plans: Estimating Local Sea Level Objective The objective is to train students' skills in observing the local environment based upon the sea level...

18

ARM - ARM Safety Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Policy Safety Policy About Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Facility Documents ARM Management Plan (PDF, 335KB) Field Campaign Guidelines (PDF, 1.1MB) ARM Climate Research Facility Expansion Workshop (PDF, 1.46MB) Facility Activities ARM and the Recovery Act Contributions to International Polar Year Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send ARM Safety Policy The ARM Climate Research Facility safety policy states that all activities for which the ARM Climate Research Facility has primary responsibility will be conducted in such a manner that all reasonable precautions are taken to protect the health and safety of employees and the general public. All

19

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network (OSTI)

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

20

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

6 Management Plan Introduction  

E-Print Network (OSTI)

and enhance the fish and wildlife populations and the aquatic and terrestrial ecosystems that exist within for restoration of fish and wildlife habitat and populations which form the bulk of the management plan is derived or the inventory. The assessment and inventory are designed and may be used to guide restoration and management

22

Factored Planning for Controlling a Robotic Arm: Theory Jaesik Choi and Eyal Amir  

E-Print Network (OSTI)

Factored Planning for Controlling a Robotic Arm: Theory Jaesik Choi and Eyal Amir Computer Science Controlling robotic arms is important for real, physical world applications. Such control is hard because move naturally to a subsumption-architecture-like control of robotic arms. 1 Introduction A robotic arm

Amir, Eyal

23

Strategic Plan Recreation Management  

E-Print Network (OSTI)

Strategic Plan Recreation Management Department Brigham Young University 2013 #12;Vision We strive in meaningful recreational experiences. Core Values We value the role wholesome recreation plays in the well strive to make meaningful contributions to both recreation related research and practice. Department

Olsen Jr., Dan R.

24

Science Plan for the Atmospheric Radiation Measurement Program (ARM)  

SciTech Connect

The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE`s programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols.

NONE

1996-02-01T23:59:59.000Z

25

Project Management Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

26

Plutonium Vulnerability Management Plan  

SciTech Connect

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

27

-News Home Help Chirac defends planned EU arms sales to China to nervous Japan  

E-Print Network (OSTI)

-News Home Help Chirac defends planned EU arms sales to China to nervous Japan Sun Mar 27,11:33 AM Union ( - ) arms embargo on China, telling a nervous Japan the move would not entail transfers ban, acknowledged that Japan was worried about arms sales to its neighbor and growing rival but said

28

ARM Tropical Western Pacific (TWP) Operations Management and Support: Securing ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Tropical Western Pacific (TWP) Operations Tropical Western Pacific (TWP) Operations Management and Support: Securing ARM Data K. L. Nitschke South Pacific Regional Environment Programme Apia, Samoa L. Jones Los Alamos National Laboratory Los Alamos, New Mexico C. N. Long Pacific Northwest National Laboratory Richland, Washington Introduction The Tropical Western Pacific Office (TWPO) (a) has been tasked with providing operational management and support for three (b) climate station instrument facilities in the Tropical Western pacific (TWP) locale. The TWPO has the distinctive purview in ensuring data availability from two remote Pacific Islands and Australia to support the continued national and international scientific collaboration that exemplifies the Atmospheric Radiation Measurement (ARM) Program. Data from the international sites have been

29

SES Performance Management System Plan Training | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Plan Training SES Performance Management System Plan Training Overview of the DOE SES Performance Management System. Senior Executive Service Performance...

30

Natural Resource Management Plan Update  

E-Print Network (OSTI)

Natural Resource Management Plan Update Tim Green Environmental Protection Division Community. Cultural Resources) · Focus on gaining better understanding of site resources · Began or continued managing · Monitoring layers · Cultural Resources ­ WW I, WW II, CCC GIS used for planning ­ NSLS II, LISF, Permits, etc

Homes, Christopher C.

31

PRC Contract Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Contract Management Team Members, Including Roles and Responsibilities ... 3 Contracting Officer ......

32

LPP Risk Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

History and Process History and Process Slide 2 M E Environmental Management Environmental Management History ◦ Current Baseline Process Overview ◦ Identification ◦ Simulation ◦ Management Successes & Challenges Slide 3 M E Environmental Management Environmental Management Current Baseline Risks ◦ 1 Week Risk Summit held week of August 4 th , 2008 Broad representation from all levels of Isotek, DOE, PTC, and outside consultants Focused on risk and opportunity identification Included risk description, assumptions, and triggers No quantification or analysis No restrictions, constraints, or filtering HQ provided facilitator Prescribed format and capture methodology Slide 4 M E Environmental Management Environmental Management Current Baseline Risks ◦ Risk Summit Results

33

PROJECT MANAGEMENT PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

34

Environmental Management System Plan  

E-Print Network (OSTI)

management Water conservation LBNLs approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

35

Planning of Minimum-Time Trajectories for Robot Arms  

E-Print Network (OSTI)

The minimum-time for a robot arm has been a longstanding and unsolved problem of considerable interest. We present a general solution to this problem that involves joint-space tesselation, a dynamic time-scaling ...

Sahar, Gideon

1984-11-01T23:59:59.000Z

36

ARM -  

NLE Websites -- All DOE Office Websites (Extended Search)

Center Blog Center Blog Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance AMF2 Arrives in Finland Jan 02, 2014 [ ARM Mobile Facility 2, BAECC, Blog, Field Notes ] After nine months at sea aboard the Horizon Spirit, the AMF2 reached land for an extended stay at the Station for Measuring Forest Ecosystem-Atmosphere Relations (SMEAR II) in Hyytiala, Finland. This nine-month, land-based deployment is in support of the Biogenic Aerosols-Effects on Clouds and Climate (BAECC) project. The deployment begins February 1, 2014, and [...]

37

Environmental Management System Plan  

E-Print Network (OSTI)

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNLs approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

38

ARM - Glossary  

NLE Websites -- All DOE Office Websites (Extended Search)

govAboutGlossary govAboutGlossary About Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Facility Documents ARM Management Plan (PDF, 335KB) Field Campaign Guidelines (PDF, 1.1MB) ARM Climate Research Facility Expansion Workshop (PDF, 1.46MB) Facility Activities ARM and the Recovery Act Contributions to International Polar Year Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Acronyms / Glossary 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z A absolute humidity The mass of water vapor in a given volume. absolutely stable air An atmospheric condition that exists when the environmental lapse rate is less than the moist adiabatic lapse rate. absolutely unstable air

39

Best Management Practice: Water Management Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning Best Management Practice: Water Management Planning October 7, 2013 - 3:03pm Addthis A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans. Water management plans should provide clear information about how a facility uses water from the time it is piped in to its ultimate disposal. Knowing how water is used and what it costs enables Federal agencies to make appropriate water management decisions. Overview Federal facility water management plans should include the following: Water Use Policy Statement and Goals Senior management should indicate support for water efficiency in a material way. This can be done in two ways:

40

DOE/SC-ARM-14-024 ARM Climate Research Facility Data Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

(ORNL) (Giri Palanisamy and Raymond McCord) * Provided collection support: Infrared Thermometer (IRT), total precipitation sensor (TPS), Infrared Sky Imager (IRSI), and C-Band ARM...

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Water Management Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

water efficiency water efficiency at Federal sites Background The Federal Energy Management Program (FEMP) sponsored a water assessment at the Y-12 National Security Complex (Y-12) located in Oak Ridge, Tennessee, during fiscal year 2010. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment was to develop a comprehensive understanding of the current water-consuming applications and equipment at Y-12 and to identify key areas for water efficiency improvements. The water-assessment team learned key lessons from the Y-12 assessment. Therefore, the aim of this document is to share these key lessons to help other large process-driven sites at the Department of Energy (DOE) and beyond develop a comprehensive

42

Water Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

water efficiency water efficiency at Federal sites Background The Federal Energy Management Program (FEMP) sponsored a water assessment at the Y-12 National Security Complex (Y-12) located in Oak Ridge, Tennessee, during fiscal year 2010. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment was to develop a comprehensive understanding of the current water-consuming applications and equipment at Y-12 and to identify key areas for water efficiency improvements. The water-assessment team learned key lessons from the Y-12 assessment. Therefore, the aim of this document is to share these key lessons to help other large process-driven sites at the Department of Energy (DOE) and beyond develop a comprehensive

43

DOCS System Configuration Management Plan | Department of Energy  

Energy Savers (EERE)

DOCS System Configuration Management Plan DOCS System Configuration Management Plan The DOCS Systems Configuration Management Plan (SCMP), from an actual DOE systems engineering...

44

Adaptive Management, Adaptive Planning, Review and Audit  

Science Journals Connector (OSTI)

Planning should be a continuous, iterative and developmental ... for any given place and time. Management reviews are an integral and essential component of ... is not strictly a component of the management planning

Mike Alexander

2013-01-01T23:59:59.000Z

45

ConservationandDemand ManagementPlan  

E-Print Network (OSTI)

; Introduction Ontario Regulation 397/11 under the Green Energy Act 2009 requires public agencies and implement energy Conservation and Demand Management (CDM) plans starting in 2014. Requirementsofthe ConservationandDemand ManagementPlan 2014-2019 #12

Abolmaesumi, Purang

46

ARM - Data Documentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation Documentation Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Documentation A day of data files is bundled or processed into a single 24-hour file that represents a data stream, which is then stored at the ARM Data Archive. A day of data files is bundled or processed into a single 24-hour file that represents a data stream, which is then stored at the ARM Data Archive. Data collected through the routine operations and scientific field

47

Performance Demonstration Program Management Plan  

SciTech Connect

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

48

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network (OSTI)

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

49

Planning for an Energy Management System  

Energy.gov (U.S. Department of Energy (DOE))

This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

50

Optimization Online - Operations Risk Management by Planning ...  

E-Print Network (OSTI)

Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragni re(Emmanuel.Fragniere ***at***...

Emmanuel Fragni re

2007-08-01T23:59:59.000Z

51

EEO Management Plan 20072010 September 2007 1  

E-Print Network (OSTI)

EEO Management Plan 2007­2010 September 2007 1 EEO Management Plan 2007-2010 Part 9A of the Anti-Discrimination Act (1977) and the Equal Opportunity for Women in the Workplace Act 1999, the EEO Management Plan awarded annually by EOWA) CDPS Cultural Diversity Priorities Statement HRS Human Resource Services ODU

Dunstan, Neil

52

Solid Waste Management Plan. Revision 4  

SciTech Connect

The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

NONE

1995-04-26T23:59:59.000Z

53

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

54

Waste Management Quality Assurance Plan  

SciTech Connect

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

55

ICDF Complex Operations Waste Management Plan  

SciTech Connect

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

56

Overview of the Hanford risk management plan  

SciTech Connect

The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

Halverson, T.G.

1998-03-26T23:59:59.000Z

57

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN  

E-Print Network (OSTI)

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision.0 Monitoring & Review 15 #12;UCL ASBESTOS MANAGEMENT PLAN Revision 6 Page 3 of 16 POLICY STATEMENT UCL Estates of Asbestos Regulations 2006 Peter Harrison HSMT 3 30-07-10 Revised to merge policy and plan and provide

Saunders, Mark

58

Integrated safeguards and security management plan  

E-Print Network (OSTI)

LBNL/PUB-3151 INTEGRATED SAFEGUARDS AND SECURITY MANAGEMENT76SF00098 iv Integrated Safeguards and Security Managementprovided. Appendix A. Safeguards and Security Plan http://

Bowen editor, Sue

2001-01-01T23:59:59.000Z

59

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I  

E-Print Network (OSTI)

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I DAVID DUFFY,* S with planning experts and reviewed current literature to derive 15 criteria that in our opinion were important that reviewed plans only partially fulfilled most criteria. Only five reviewed plans came within 10% of total

Duffy, David Cameron

60

Evolution and Evaluation of the Active Management Area Management Plans  

E-Print Network (OSTI)

on Management Plan Information 29 Municipal 29 Agricultural 30 Industrial 31 Water Budgets 32 Other Summary 46 Appendix C: Tucson AMA 2006 Water Budget 48 Appendix D: Groundwater Management Plan Legislative of the Arizona Groundwater Management Act (GMA), the Arizona Department of Water Resources (ADWR

Fay, Noah

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

LFRG Program Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG...

62

PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plan Examples Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Sect. 6.e.7.a Sect. 4.1.1 Step 1 1. Example 1

63

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

64

Office of Facilities Planning and Management  

E-Print Network (OSTI)

Office of Facilities Planning and Management Building Best Practices Through Energy Efficiency;Office of Facilities Planning and Management Recycling Plastics All Bottles and Cans Plastic Metal Glass All #1 and #2 Plastics Eg. Some salad containers NO Styrofoam Lab glass (including test tubes

Ford, James

65

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

66

ARM - ARM Organization  

NLE Websites -- All DOE Office Websites (Extended Search)

ARMARM Organization ARMARM Organization Laboratory Partners Nine DOE national laboratories share the responsibility of managing and operating the ARM Climate Research Facility. ARM Group Links Science Board SISC Charter Data Archive Data Management Facility Data Quality Program Engineering Support External Data Center ARM Organization The ARM Climate Research Facility operates field research sites around the world for global change research. Three primary locations-Southern Great Plains, Tropical Western Pacific, North Slope of Alaska-plus aircraft and the portable ARM Mobile Facilities-are heavily instrumented to collect massive amounts of atmospheric measurements needed to create data files. Scientists use these data to study the effects and interactions of sunlight, clouds, and radiant energy, as well as interdisciplinary research

67

MA - Office of Management - Energy Conservation Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA Energy Conservation Plan MA Energy Conservation Plan January 2010 1 Office of Management Office-Level Energy Conservation Plan January 2010 I. BACKGROUND This energy conservation plan represents an effort to reduce energy consumption within Office of Management (MA) office spaces and to increase employee awareness of and participation in energy conservation measures. II. SCOPE The plan and procedures in this document apply to all Office of Management (MA) office suites in the Forrestal and Germantown Facilities as well as the 950 L'Enfant Plaza Building. The actions and procedures set forth in this plan apply to each separate MA office suite as follows: MA-1: 4A-107 MA-43: 1F-039 MA-70: 7E-074 MA-1.1: 7E-028 MA-43: 1F-037 MA-70: 7E-054 MA-30: GH-081 MA-43:

68

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that  

E-Print Network (OSTI)

Data Management Plan (outline) The Data Management Plan (DMP to the funder's Data Policy and (2) how the investigator plans to manage the data should cover the following topics: 1. Information about the data · Describe

69

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

70

Waste Isolation Pilot Plant, Land Management Plan  

SciTech Connect

To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

Not Available

1993-12-01T23:59:59.000Z

71

ARM - Contacts  

NLE Websites -- All DOE Office Websites (Extended Search)

Church, Pacific Northwest National Laboratory Communications Specialist - Kyle Westcott, Pacific Northwest National Laboratory What We Do The ARM communications team manages...

72

Materials Sciences Division Integrated Safety Management Plan  

E-Print Network (OSTI)

..........................................................................................................................................2! 1.1 SAFETY CULTURE .......................................................4! 3. SAFETY RESPONSIBILITY, AUTHORITY, ACCOUNTABILITY AND A JUST CULTURE.........5! 3Materials Sciences Division Integrated Safety Management Plan Revised: February 9, 2012 Prepared by

73

California Groundwater Management Plans | Open Energy Information  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Groundwater Management PlansLegal Published NA Year Signed or Took Effect 2014...

74

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

75

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

76

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network (OSTI)

AND PLANNING M&P-144 the Agency's workforce is well informed of major Agency initiatives and human capitalManagement and Performance PERFORMANCE REPORTING AND PLANNING M&P-143 Strategic Goal 5: Enable.1: IDENTIFY, CULTIVATE, AND SUSTAIN A DIVERSE WORKFORCE AND INCLUSIVE WORK ENVIRONMENT THAT IS NEEDED

77

Draft of the PHENIX Management Plan  

SciTech Connect

The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

Not Available

1994-03-10T23:59:59.000Z

78

2011-2015 Human Capital Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This Human Capital Management Plan (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. 2011-2015 Human Capital Management Plan More...

79

Emergency Management: Facility Emergency Plan Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Laboratory Building 219, 274 and 278 SSRL Building Facility Emergency Plan In Case of Emergency 9-911 from a SLAC phone 911 from a non-SLAC phone Then notify SLAC Site Security, Ext. 5555 SLAC Emergency Resources SLAC Site Security 5555 On-site Palo Alto Fire Station Number 7 2776 Conventional and Experimental Facilities 8901 Normal working hours only SLAC Medical Department 2281 Waste Management 2399 Building manager Larry Cadapan Assistant building manager Brian Choi Publication date 02/11/2009 Revision date 02/11/2009 Prepared by Behzad Bozorg-Chami Approved by Larry Cadapan 20 Jun 2007 (updated 30 Jun 2007) SLAC-I-730-0A14J-001-R000 2 of 12 Emergency Management: Facility Emergency Plan Template This facility emergency plan (FEP) contains building-specific emergency information for

80

2011-2015 Human Capital Management Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. Our differs from previous versions not only in enhanced visual appeal (including photos of LM staff and sites) but also in showing direct links between our objectives, strategies, and activities and the human capital issues most important to President Obama's Administration, the Department, and our own management and staff. We thank the LM Management Team and other staff who contributed to and commented on this plan. We all know that for the LM HCMP to succeed we must continually evaluate our progress and adjust our plan

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft Word - ContractManagementPlanningDRIVERS.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drivers for Ineffective and Effective Drivers for Ineffective and Effective Contract Management and Planning Ineffective Contract Management and Planning Effective Contract Management and Planning 1. Top management does not demonstrate a commitment to contract management planning. 2. Contract team members not clear on contract requirements. 3. Contract team members left out of planning process. 4. Lack of coordination and communication amongst the team members. 5. Contract team members not sure of roles, responsibilities, and limitations. 6. Contract team members not clear on how their responsibilities relate, or interact with, other team members. 1. Top management actively demonstrates a commitment to the contract management planning process. 2. Top management mandates training for the

82

DOE/SC-ARM-13-022 ARM Climate Research Facility The U.S. Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Climate Research Facility The U.S. Department of Energy Management Plan August 2013 Work supported by the U.S. Department of Energy, Office of Science, Office of...

83

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Capabilities Promoted at Air & Waste Management Conference Bookmark and Share From left, Dr. Sylvia Edgerton, Science Liaison for the ARM Science Board, Dr. John Watson,...

84

Federal Energy Management Program: Renewable Energy Project Planning and  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

85

CRAD, Configuration Management Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

86

Strategic Planning System for Exotic Game Management  

E-Print Network (OSTI)

. Jerry Stuth The paradigm of indiscriminate introduction of exotic ungulates has escalated the need for ecological and biological understanding of nonindigenous species. Management of any species or animal enterprise is a dynamic process..., and requires ecological considerations as well as economic constraints. The initial framework of Strategic Planning System for Exotic Game (SPSEG) may allow proactive management of animal enterprises and help mediate the often conflicting short term needs...

Lubbering, Jeanne Marie Petrofes

2012-06-07T23:59:59.000Z

87

Project Hanford management contract quality improvement project management plan  

SciTech Connect

On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

ADAMS, D.E.

1999-03-25T23:59:59.000Z

88

Federal Energy Management Program: Advanced Technology Planning for Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Advanced Technology Planning for Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Facebook Tweet about Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Twitter Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Google Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Delicious Rank Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Digg Find More places to share Federal Energy Management Program:

89

Water quality management plan for Cherokee Reservoir  

SciTech Connect

The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

Not Available

1984-01-01T23:59:59.000Z

90

Carbon Management and Implementation Plan 1. Background  

E-Print Network (OSTI)

the College's energy efficiency and use of resources by integrating sustainability with corporate strategiesCarbon Management and Implementation Plan 1. Background Energy security and the increasing concentration of greenhouse gases which contribute to climate change are one of the biggest challenges facing us

Chittka, Lars

91

CARTER MAPS PLAN TO MANAGE NUCLEAR WASTE  

Science Journals Connector (OSTI)

CARTER MAPS PLAN TO MANAGE NUCLEAR WASTE ... The first part of the 15-year program will concentrate on locating and characterizing a number of potential repository sites, capable of isolating from the biosphere both defense and commercial high-level nuclear wastes. ...

1980-02-18T23:59:59.000Z

92

Carbon Management Plan 1. Executive summary 5  

E-Print Network (OSTI)

of energy intensive buildings have been constructed, whilst at the same time disposals have concentrated. Background and context 16 4. Carbon management strategy 18 5. Carbon emissions baseline and projections 22 6 Plan interventions 55 Appendix B: Possible future actions 76 #12;4 #12;5 1. EXECUTIVE SUMMARY Foreword

Haase, Markus

93

Nevada Test Site Resource Management Plan  

SciTech Connect

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

94

ARM - Data Product Registration and Submission  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationData Product Registration and Submission DocumentationData Product Registration and Submission Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Product Registration and Submission The procedure for principal investigators to submit ARM science research products, field campaign data, or DOE-supported research data to the ARM Data Archive is the following: To begin, use the Data Product Registration and Submission form. Identify yourself-either from the pick list or by manual entry.

95

ARM - Data Sharing and Distribution Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationData Sharing and Distribution Policy DocumentationData Sharing and Distribution Policy Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Data Sharing and Distribution Policy Purpose This document sets expectations and establishes procedures for sharing data acquired in through the operations of Atmospheric Radiation Measurement (ARM) Climate Research Facility. These data may be acquired from routine ARM-supported efforts or from collaborating or cooperating programs. When

96

Utah Nonpoint Source Pollution Management Plan | Open Energy...  

Open Energy Info (EERE)

Management Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Utah Nonpoint Source Pollution Management...

97

Bureau of Land Management - Land Use Planning | Open Energy Informatio...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Bureau of Land Management - Land Use Planning Abstract The BLM's Resource Management Plans (Land Use...

98

Surface Spectral Albedo Intensive Operational Period at the ARM SGP Site in august 2002: Results, Analysis, and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Spectral Albedo Intensive Operational Period Spectral Albedo Intensive Operational Period at the ARM SGP Site in August 2002: Results, Analysis, and Future Plans A. P. Trishchenko and Y. Luo Canada Centre for Remote Sensing Ottawa, Ontario, Canada M. C. Cribb and Z. Li University of Maryland College Park, Maryland K. Hamm University of Oklahoma Norman, Oklahoma Introduction A surface spectral albedo Intensive Operational Period (IOP) at the Atmospheric Radiation Measurement (ARM) Southern Great Plains (SGP) site was conducted during August 14-19, 2002, to meet the ARM Program need in a detailed knowledge of surface boundary conditions for atmospheric radiation studies. We measured surface spectral albedos/reflectances for several representative surface types and made a survey of landcover types over an area of approximately 10 km x 10 km centered

99

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network (OSTI)

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

100

LFRG Program Management Plan (LFRG PMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LOW-LEVEL WASTE DISPOSAL FACILITY LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay Rhoderick, Co-Chair William E. Murphie, Co-Chair LFRG Members Joel Case, Idaho Operations Office Frank DiSanza, Nevada Operations Office Doug Hildebrand, Richland Operations Office Randy Janke, Ohio Field Office Bill McMillan, Oak Ridge Operations Office Virgil Sauls, Savannah River Operations Office Jim Orban, Albuquerque Operations Office Andy Wallo, Office of Environment, Safety and Health DOE Headquarters Distribution: David M. Michaels, Assistant Secretary for Environment, Safety and Health, EH-1 Madelyn Creedon, Deputy Administrator for Defense Programs, DP-1 Rose E. Gottemoeller, Deputy Administrator for Defense Nuclear Nonproliferation, NN-1

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

102

The ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Aerial Facility ARM Aerial Facility in the Biomass Burn Observation Project (BBOP) 1 Beat Schmid, Technical Director Pacific Northwest National Laboratory Richland, WA Aircraft Technical Information Length: 19.4 m Wingspan: 23.9 m Height: 7.1 m Cabin space: 15.3 m 2 External probes (PMS cans): 8 Maximum gross weight: 16,330 kg Maximum Endurance: 9.5 hours Maximum Range: 4000 km Endurance with full payload: 4-5 hours Crew capacity: 7 max, 2 pilots + 3-5 scientists Cabin payload: 1,900 kg Research Power: 700A @ 28 VDC (incl. 85A @ 115 VAC, 60 Hz) Ceiling: 7.6 km G-1 (BMI owned, ARM base funded, PNNL based and managed, for the science community) AAF G-1 Plan 2013-17 Intensive Airborne Research in Amazonia (IARA) Manaus, Brazil PI: Scot Martin (Harvard)

103

E-Print Network 3.0 - area management plan Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Summary: and Wholesaling Management 27647 Airlines and Transportation Management 27649 Ecotourism Planning and Management... Ecotourism Planning and Management (Speak to Stephen...

104

John Day Subbasin Revised Draft Plan March 15, 2005 5. Management Plan  

E-Print Network (OSTI)

John Day Subbasin Revised Draft Plan March 15, 2005 224 5. Management Plan The Management Plan land managers, makes efficient use of resources and respects property rights. The result will be sustainable, resource-based activities that contribute to the social, cultural and economic well

105

Strategic Energy Management Plan for the 1990's  

E-Print Network (OSTI)

This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

Fiorino, D. P.; Priest, J. W.

1987-01-01T23:59:59.000Z

106

ARM - ARM Recovery Act Project FAQs  

NLE Websites -- All DOE Office Websites (Extended Search)

ActARM Recovery Act Project FAQs ActARM Recovery Act Project FAQs Recovery Act Logo Subscribe FAQs Recovery Act Instruments Recovery Act Fact Sheet March 2010 Poster (PDF, 10MB) External Resources Recovery Act - Federal Recovery Act - DOE Recovery Act - ANL Recovery Act - BNL Recovery Act - LANL Recovery Act - PNNL Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send ARM Recovery Act Project FAQs Why is ARM buying new instruments and equipment? The ARM Climate Research Facility (ARM) is receiving $60 million dollars in Recovery Act funding from the U.S. Department of Energy Office of Science to build the next generation facility for climate change research. Using input from past ARM user workshops and ARM working group discussion, ARM has planned for the purchase and deployment of an expansive array of new

107

Excess Uranium Inventory Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective management of the Energy Department's surplus uranium inventory in support of meeting its critical environmental cleanup and national security missions. The Plan is not a commitment to specific activities beyond those that have already been contracted nor is it a restriction on actions that the Department may undertake in the future as a result of changing conditions. It replaces an earlier plan issued in 2008 and reflects updated information on the Department of Energy's management and disposition of its excess uranium inventories. Excess Uranium Inventory Management Plan More Documents & Publications

108

Water resource management planning guide for Savannah River Plant  

SciTech Connect

The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

1988-10-01T23:59:59.000Z

109

Federal Energy Management Program: Portfolio-Based Planning Process for  

NLE Websites -- All DOE Office Websites (Extended Search)

Portfolio-Based Portfolio-Based Planning Process for Greenhouse Gas Mitigation to someone by E-mail Share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Facebook Tweet about Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Twitter Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Google Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Delicious Rank Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Digg Find More places to share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on

110

Massachusetts Ocean Management Plan (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Ocean Management Plan (Massachusetts) Massachusetts Ocean Management Plan (Massachusetts) Massachusetts Ocean Management Plan (Massachusetts) < Back Eligibility Construction Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Water Buying & Making Electricity Wind Program Info State Massachusetts Program Type Siting and Permitting Provider Executive Office of Energy and Environmental Affairs The Massachusetts Ocean Act of 2008 required the state's Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan identified certain state waters that are eligible for offshore wind, wave and tidal energy development and other state waters where such development is

111

Sustainable Energy Action Plans: Project Management Intercomparison  

Science Journals Connector (OSTI)

Abstract This paper explores the content of various Sustainable Energy Action Plans (SEAPs) necessary to the Covenant of Mayors. This study has the aim of providing an overview of existing methodologies for the development and implementation of \\{SEAPs\\} by municipalities. As the number and complexity of issues related with energy are very broad, it is very important to know and identify good practices and guidelines to increasing participant municipalities. Based on the methodologies collected in several studies, it is possible to identify key aspects and issues municipalities might consider for the development of their own plan. The SEAP cant be only a collection of measures; it must have a coherent strategy with the European and National policies. This study also shows that a good coordinator with project management skills is necessary to overcome obstacles due to the lack of communication or collaboration among the different municipality's departments.

Eurico Vasco Amorim

2014-01-01T23:59:59.000Z

112

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE  

E-Print Network (OSTI)

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE March 30, 2011 President Boren established the OU Retirement Plans Management Committee to identify ways for OU to help increase its,000 OU employees participating in the retirement savings plans. A transition period to the master

Oklahoma, University of

113

James F. Argue Nuclear Engineering and Planning Manager  

E-Print Network (OSTI)

James F. Argue Nuclear Engineering and Planning Manager Portsmouth Naval Shipyard Naval Sea Systems Command In June of 2003 Mr. Argue was assigned as the Nuclear Engineering and Planning Manager, a Senior Executive position. Mr. Argue is the head of the Nuclear Engineering and Planning Department

114

Mixed Waste Focus Area program management plan  

SciTech Connect

This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

Beitel, G.A.

1996-10-01T23:59:59.000Z

115

Safeguards and Security Program Planning and Management  

Directives, Delegations, and Requirements

The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

116

Water Resource Planning and Management using Motivated Machine JANUSZ STARZYK  

E-Print Network (OSTI)

1 Water Resource Planning and Management using Motivated Machine Learning JANUSZ STARZYK School@ohio.edu Abstract Water resources planning and management require problem resolution and optimized use of resources. Since many objectives in water management are conflicting, it is hard to devise one optimum strategy

Starzyk, Janusz A.

117

8 Management Plan 8.1.1 Introduction  

E-Print Network (OSTI)

management and use of natural resources including reliable water supplies, fish and wildlife populations145 8 Management Plan 8.1.1 Introduction The information below will be used by subbasin planners that will aid in the recovery of focal species. The management plan is made up of five components: the vision

118

Arid Lands Ecology Facility management plan  

SciTech Connect

The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

None

1993-02-01T23:59:59.000Z

119

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

120

Systems Engineering Management Plan for the Tank Farm Contractor  

SciTech Connect

This plan describes the systems engineering process to develop and manage the technical baseline. It defines the documents, interfaces, and procedures used by the Tank Farm Contractor.

O'TOOLE, S.M.

2000-04-20T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2009-02-01T23:59:59.000Z

122

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2011-02-01T23:59:59.000Z

123

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Julie Braun Williams

2013-02-01T23:59:59.000Z

124

ARM - Publications Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information...

125

ARM - Blog Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 23, 2012 ARM Mobile Facility 1, Blog, Field Notes Azores Welcomes News of U.S. Science Commitment Bookmark and Share Kim Nitschke, Azores and ARM Mobile Facility Site Manager...

126

Industrial Engineering & ManagementStrategic Plan 2014-2018  

E-Print Network (OSTI)

Industrial Engineering & ManagementStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Industrial Engineering and Management at Oklahoma State University and first Ph.D. in 1960. This School has been represented and led by giants in Industrial Engineering

Piao, Daqing

127

Mitch S. Daugherty Nuclear Engineering and Planning Manager  

E-Print Network (OSTI)

Mitch S. Daugherty Nuclear Engineering and Planning Manager Naval Sea Systems Command, Norfolk Naval Shipyard Mitch Daugherty is the Nuclear Engineering and Planning Manager and the senior civilian. Daugherty also headed the Nuclear Refueling Division, the Nuclear Test Engineering Division, and the Nuclear

128

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network (OSTI)

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

129

Mission Plan for the Civilian Radioactive Waste Management Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Summary In response to the the requirement of the Nuclear Waste Policy Act of 1982, the Office of Civilian Radioactive Waste Management in the Department of Energy (DOE) has prepared this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and strategy for the disposal of spent nuclear fuel and high-level waste. It explains that, to meet the directives of the Nuclear Waste Policy Act, the DOE intends to site, design, construct., and start operating a mined geologic repository by January 31, 1998. The Act specifies that the costs of these

130

ARM - Reading netCDF, HDF, and GRIB Files  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationReading netCDF, HDF, and GRIB Files DocumentationReading netCDF, HDF, and GRIB Files Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Reading netCDF, HDF, and GRIB Files netCDF Files Most ARM data are stored in netCDF format. This format allows for the definition of data fields and storage of operational information in the header of the file. All ARM netCDF files are in UTC time and represent time as "seconds since January 1, 1970,'' which is called the "epoch time.'' For

131

Configuration Management Plan for the Tank Farm Contractor  

SciTech Connect

The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

WEIR, W.R.

2000-04-21T23:59:59.000Z

132

ARM - Field Campaigns  

NLE Websites -- All DOE Office Websites (Extended Search)

alpacas clouds-anvil german-scene instrumentfield pye-night racoro-inst rhubc-layout snowy-site twpice-ship walter-annemarie alpacas clouds-anvil german-scene instrumentfield pye-night racoro-inst rhubc-layout snowy-site twpice-ship walter-annemarie How Do I Propose a Campaign? First, review the guidelines for submitting proposals. Next, submit a preproposal; a short summary of the proposed campaign. Wait for a response from the Infrastructure Management Board (IMB) and/or ARM Science Board. A full proposal or science plan, may be requested. Decision is made-now what is expected? ARM Climate Research Facility users regularly conduct field campaigns to augment routine data acquisitions and to test and validate new instruments. Announcements 13 Dec 2013 Now accepting proposals for use of an AMF, AAF, or augment observations at one of our fixed sites. Smaller campaigns in FY2014 and FY2015 can also be

133

Project Management Plan Examples 1 - 80 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

134

Water Management Plans for Surface Coal Mining Operations (North Dakota) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Plans for Surface Coal Mining Operations (North Management Plans for Surface Coal Mining Operations (North Dakota) Water Management Plans for Surface Coal Mining Operations (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State North Dakota Program Type Siting and Permitting A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit is submitted to the

135

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

More Storage Space, Better Reliability Now at the ARM Data Management More Storage Space, Better Reliability Now at the ARM Data Management Facility Bookmark and Share To support the ever-increasing file storage needs of the ARM Data Management Facility (DMF) and ARM Engineering computers, a Network Appliance (NetApp®) file server with 2.68 terabytes, or 2.95 trillion bytes, of highly-reliable and extremely-fast, usable disk storage joined the DMF servers. The NetApp system performs nearly four times faster than the previous file server and is engineered for a higher degree of reliability-critical improvements needed to maintain uptime for ARM data availability at the DMF. A NetApp server increases ARM storage capacity and keeps the data flowing at the Data Management Facility. A NetApp server increases ARM storage capacity and keeps the data flowing

136

BNL-100708-2013 Cultural Resource Management Plan  

E-Print Network (OSTI)

BNL-100708-2013 Cultural Resource Management Plan for Brookhaven National Laboratory May 2013 of this manuscript, or allow others to do so, for United States Government purposes. #12;Cultural Resource Management Cultural Resources CRC Cultural Resources Coordinator CRM Cultural Resource Management CRMP Cultural

137

Storm Water Management Plan Program (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Grant Program Provider Natural Resources This legislation implements the National Pollutant Discharge Elimination

138

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

139

Mississippi Headwaters Planning and Management (Minnesota) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headwaters Planning and Management (Minnesota) Headwaters Planning and Management (Minnesota) Mississippi Headwaters Planning and Management (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting Construction and development is restricted and largely prohibited near the

140

ARM - Website Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Administration About Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Facility Documents ARM Management...

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 15, 2005 Facility News More Server Power Improves Performance at the ARM Data Management Facility Bookmark and Share Recently, several new Sun servers joined the...

142

Cost-Efficiency in Water Management Through Demand Side Management and Integrated Planning  

Science Journals Connector (OSTI)

In the context of regional planning for efficient management of water and wastewater, it is crucial ... situation. This consists of measures for water demand side management, comparison of different scenarios of ...

Dr. Ing. Ralf Otterpohl

2008-01-01T23:59:59.000Z

143

Federal Energy Management Program: Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans, Implementation, and Results Plans, Implementation, and Results The U.S. Department of Energy's Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations, by bringing expertise from all levels of project and policy implementation, to enable Federal agencies to meet energy-related goals and provide energy leadership to the country. This Web page includes links to documents that support the office management process and the results and public benefits that derive from it. Overview Learn more about this EERE office. Plans Discover the plans, budgets, and analyses that set the direction of this office's priorities and activities. Implementation Find out how this office controls, implements, and adjusts its plans and manages its activities.

144

Revised Acquisition Guide Chapter 42.5, Contract Management Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-24 2-24 Date: February 21, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Revised Acquisition Guide Chapter 42.5, Contract Management Planning Summary: The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter.

145

BLM - Approved Resource Management Plan Amendments/Record of...  

Open Energy Info (EERE)

Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference LibraryAdd to...

146

Economic and Hydrologic Implications of Proposed Edwards Aquifer Management Plans  

E-Print Network (OSTI)

, according to Texas water law, ground water is a property right vested with the land owner. Throughout at least the past two decades, attempts to negotiate voluntary management plans to restrict pumpage have been unsuccessful, even though demand is projected...

Dillon, Carl R.; Jones, Lonnie L.; Williams, R. Lynn; Jordan, Wayne R.; McCarl, Bruce A.

147

Bureau of Land Management - Land Use Planning Handbook | Open...  

Open Energy Info (EERE)

Bureau of Land Management - Land Use Planning Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Bureau of...

148

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

149

Rangeland Resource Management for Texans: Strategic Planning for Success  

E-Print Network (OSTI)

For the rangeland manager, strategic planning begins with defining the mission. Then it is important to set goals that are realistic in light of the internal and external environments in which the business operates. This publication can help...

Fox, William E.

2002-03-04T23:59:59.000Z

150

Managing the Transition State for Energy Strategic Planning  

E-Print Network (OSTI)

MANAGING THE TRANSITION STATE FOR ENERGY STRATEGIC PLANNING a Thomas A. Koehler Eastman Kodak Company Rochester, New York ABSTRACT Corporate energy conservation programs have made substantial gains in reducing energy consumption during... the last decade. The responses to survive the mid-1970's global energy uncertainties were made in a crisis environment. Now, there is a transition from energy conservation to energy strategic planning. Energy engineers and managers need to im prove...

Koehler, T. A.

151

The mixed waste management facility, FY95 plan  

SciTech Connect

This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

Streit, R.

1994-12-01T23:59:59.000Z

152

Excess Uranium Inventory Management Plan 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Excess Uranium Inventory Management Plan 2008 Excess Uranium Inventory Management Plan 2008 Excess Uranium Inventory Management Plan 2008 On March 11, 2008, Secretary of Energy Samuel W. Bodman signed a policy statement1 on the management of the U.S. Department of Energy's (DOE) excess uranium inventory (Policy Statement). This Policy Statement provides the framework within which DOE will make decisions concerning future use and disposition of this inventory. The Policy Statement commits DOE to manage those inventories in a manner that: (1) is consistent with all applicable legal requirements; (2) maintains sufficient uranium inventories at all times to meet the current and reasonably foreseeable needs of DOE missions; (3) undertakes transactions involving non-U.S. Government entities in a transparent and competitive manner, unless the Secretary of

153

2012 Annual Planning Summary for Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

154

Finance and supply management project execution plan  

SciTech Connect

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

155

ARM - Field Campaign - Spring 1996 UAV IOP  

NLE Websites -- All DOE Office Websites (Extended Search)

UAV IOP Campaign Links ARM UAV Program Science Plan ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send...

156

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

157

RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING  

E-Print Network (OSTI)

: 814-863-9958. Fax: 814-865-7846. In the pharmaceutical industry, the optimal management of the newRISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman incorporate a Monte Carlo simulation procedure to a stochastic optimization model (OptFolio) of pharmaceutical

Maranas, Costas

158

Risk Management Plan Electron Beam Ion Source Project  

E-Print Network (OSTI)

, with the appropriate management oversight, can establish the specific approaches to addressing the individual riskRisk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office

159

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

Kellie, C.L.

1996-03-28T23:59:59.000Z

160

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Disruption Management ( Operations Research between planning ...  

E-Print Network (OSTI)

G enerally , a disrupted situation or j ust a disruption is a state during the ... T he plan produced by OR-based decision support are to be applied on the day of.

162

State Lands Management Plan Rosemary Hill Observatory  

E-Print Network (OSTI)

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

163

ARM - ARM Science Board  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facility Expansion Workshop (PDF, 1.46MB) Facility Activities ARM and the Recovery Act Contributions to International Polar Year Comments? We would love to hear...

164

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314 [CANCELLED  

SciTech Connect

The W-314 configuration management (CM) plan describes the systems, processes and procedures for implementing CM.

MCGREW, D.L.

2001-01-12T23:59:59.000Z

165

ARM - Events Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 12, 2011 [Events, Facility News] April 12, 2011 [Events, Facility News] ARM Participates in Second Annual Atmospheric System Research Science Team Meeting Bookmark and Share In front of her poster, Alice Cialella from Brookhaven National Laboratory speaks to ARM Aerial Facility Program Manager Rickey Petty. In front of her poster, Alice Cialella from Brookhaven National Laboratory speaks to ARM Aerial Facility Program Manager Rickey Petty. ARM Facility staff participated in the second annual Atmospheric System Research (ASR) Science Team Meeting, held March 27-April 1 in San Antonio, Texas. ASR and ARM collaborate through the use of ARM facilities for targeted field campaigns and data gathered at ARM sites for climate model improvement. The annual meeting provides an opportunity for science and

166

E-Print Network 3.0 - adaptive management plan Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

results for: adaptive management plan Page: << < 1 2 3 4 5 > >> 1 Regional Water Management: Adapting to Uncertain Water Summary: & Implement Management Options Monitor &...

167

CRAD, Configuration Management Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management Assessment Plan Configuration Management Assessment Plan CRAD, Configuration Management Assessment Plan Performance Objective: The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders. Criteria: The CM program supports DOE program implementation through the following: It provides the mechanisms for identifying, cataloging, and maintaining the design requirements and design basis (established to satisfy DOE O 420.1 Facility Safety). It carries forward the technical baseline established in the design

168

AFRD EH&S: Integrated Safety Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Safety Management Integrated Safety Management The AFRD Integrated Safety Management or ISM Plan is the master document that guides AFRD policies and practices in environment, safety, and health. The guiding principles and core functions (below left) are the key to understanding ISM. Below, right are the topically arranged sections of the AFRD ISM Plan. Depending on your workplace and duties, more than one topic may apply to you. The ISM Plan is updated as of October 2013. Please contact us with any feedback. Guiding Principles Line-management responsibility for safety Clear roles and responsibilities Competence commensurate with responsibilities Balanced Priorities Identification of ES&H standards and requirements Hazard controls (including environmental controls) tailored to work being performed

169

IT Capital Planning Corporate Management Improvement Program (CMIP) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the end of their life cycles. An investment to replace and modernize severely outdated information technology (IT) systems would prove a much more efficient expenditure of scarce IT dollars than the continued enhancement, maintenance, and operation of legacy systems. CMIP is an initiative to modernize and improve software applications, hardware, and infrastructure which support a wide range of Department-wide IT based business systems. CMIP permits the

170

Risk-based Inspection Scheduling Planning for Intelligent Agent in the Autonomous Fault Management  

SciTech Connect

This paper developed an autonomous fault management focusing to the inspection scheduling planning which was implemented to the advanced small nuclear reactor without on-site refuelling to assure the safety without human intervention. The inspection scheduling planning was developed optimally on the risk-based approach compromising between two important constraints related to the risk of action planning as such failure probability and shortest path. Performance was represented using computer simulation implemented to the DURESS components location and failure probability. It could be concluded that the first priority to be inspected was flow sensor FB2 which had the largest comparation value of 0.104233 comparing with the other components. The next route would be visited were sequentially FB1, FA2, FA1, FB, FA, VB, pump B, VA, pump A, VB2, VB1, VA2, VA1, reservoir 2, reservoir 1, FR2, and FR1. The movement route planning could be transferred to activate the robot arm which reflected as intelligent agent.

Hari Nugroho, Djoko; Sudarno [Center for Reactor Technology and Nuclear Safety-BATAN, Indonesia Building no 80 PUSPIPTEK Area, Serpong (Indonesia)

2010-06-22T23:59:59.000Z

171

Project management plan for Project W-320, Tank 241-C-106 sluicing  

SciTech Connect

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

Phillips, D.R.

1994-12-01T23:59:59.000Z

172

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park Management ­ Bachelor of Science [EH

Sheridan, Scott

173

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation Management ­ Bachelor

Sheridan, Scott

174

Oak Ridge National Laboratory Waste Management Plan. Revision 1  

SciTech Connect

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

175

TWRS process engineering data management plan  

SciTech Connect

The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner.

Adams, M.R.

1997-05-12T23:59:59.000Z

176

Microsoft Word - SPARTICUS_Science_Plan_DOE-SC-ARM-1001.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SPARTICUS: Small Particles in Cirrus Science and Operations Plan J Mace Principal Investigator E Jensen D Mitchell G McFarquhar X Liu J Comstock T Garrett T Ackerman October 2009 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not

177

DOE/SC-ARM-11-017 The Two-Column Aerosol Project (TCAP) Science Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 The Two-Column Aerosol Project (TCAP) Science Plan CM Berkowitz Principal Investigator LK Berg RA Zaveri DJ Cziczo A Zelenyuk CJ Flynn RA Ferrare EI Kassianov CA Hostetler JD Fast B Cairns PJ Rasch PB Russell JE Shilling B Ervens July 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service

178

Social Impact Management Plans: Innovation in corporate and public policy  

Science Journals Connector (OSTI)

Abstract Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs.

Daniel M. Franks; Frank Vanclay

2013-01-01T23:59:59.000Z

179

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

180

Management and planning of UAV flight pattern  

E-Print Network (OSTI)

, and action} � Implementation of autonomy in a software decisional architecture online energy autonomy UAV-known, poorly known or unknown � Uncertainties: wind gusts, measurement noise, atmospheric altitude, airspeed management � On-board implementation of the whole control loop {perception, situation assessment, decision

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Investigation-Derived Waste Management Plan. Revision 2  

SciTech Connect

SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment.

Molen, G.

1995-05-24T23:59:59.000Z

182

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

183

River Protection Project (RPP) Project Management Plan  

SciTech Connect

The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

SEEMAN, S.E.

2000-04-01T23:59:59.000Z

184

Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources  

E-Print Network (OSTI)

consistently in the development and review of nutrient management plans. There are two comprehensive Planning References are used extensively by nutrient management specialists while developing and reviewing. Included are the required standard formats for both the nutrient management plan and nutrient balance

Guiltinan, Mark

185

Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant (PFP)  

SciTech Connect

This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP.

COX, G.J.

1999-10-25T23:59:59.000Z

186

Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces Armed Services Committee United States Senate (May 8, 2013)  

Energy.gov (U.S. Department of Energy (DOE))

Senior Advisor David Huizenga represented the Department of Energys (DOE) Office of Environmental Management (EM) before the Subcommittee on Strategic Forces Armed Services Committee United States...

187

Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Strategic Forces Armed Services Committee United States House of Representatives (May 9, 2013)  

Energy.gov (U.S. Department of Energy (DOE))

Senior Advisor David Huizenga represented the Department of Energys (DOE) Office of Environmental Management (EM) before the Subcommittee on Strategic Forces Armed Services Committee United States...

188

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LIVERMORE SITE OFFICE CONTRACT MANAGEMENT PLAN For LAWRENCE LIVERMORE NATIONAL LABORATORY CONTRACT NO. DE-AC52-07NA27344 LSO_CMP_6-10-088 i CONTENTS Contents 1. INTRODUCTION.............................................................................................................. 3 2. PURPOSE .......................................................................................................................... 3 2.2 Maintenance and Distribution ......................................................................................... 4 3. CONTRACT SUMMARY AND PRINCIPAL FEATURES............................................. 4 3.1 Contract Summary ...........................................................................................................

189

Tank farm instrumentation and data acquisition/management upgrade plan  

SciTech Connect

This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

Scaief, C.C. III

1994-09-13T23:59:59.000Z

190

Financial Risk Management in Offshore Oil Infrastructure Planning and Scheduling  

Science Journals Connector (OSTI)

This paper discusses the financial risk management in the planning and scheduling of offshore oil infrastructure. The problem consists of determining the sequence of platforms to build and the wells to drill as well as how to produce these wells over a ...

Ahmed Aseeri; Patrick Gorman; Miguel J. Bagajewicz

2004-04-28T23:59:59.000Z

191

Environmental restoration and remediation technical data management plan  

SciTech Connect

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

192

Integrated safeguards and security management plan  

SciTech Connect

Berkeley Lab is committed to scientific excellence and stewardship of its assets. While security principles apply to all work performed at the Laboratory, their implementation is flexible. Berkeley Lab adheres to the following principles: Line management owns security; Security roles and responsibilities are clearly defined and communicated; Security functions are integrated; An open environment supports the Laboratory's Mission; The security program must support the scientific and operational missions of the Laboratory and must be value added; and Security controls are tailored to individual and facility requirements.

Bowen, Sue, editor

2001-04-16T23:59:59.000Z

193

Project Management Plan Examples 1 - 80 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Examples 1 - 80 Examples 1 - 80 Project Management Plan Examples 1 - 80 The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The descriptions below should be used to navigate to the subject of interest. Policy & Operational Decisions, Assumptions and Strategies - Examples 1 & 2 - Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Facility End State Decisions - Examples 3, 4 & 5 - Includes expected conditions at completion of the deactivation, DOE mission use, extended S&M, decommissioned and/or dismantled, etc.

194

Best-in-Class Project Management Initiative Corporate Implementation Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best-in-Class Project Management Initiative Best-in-Class Project Management Initiative Corporate Implementation Plan Final Prepared for: U.S. Department of Energy Prepared by: U.S. Army Corps of Engineers, Huntington District and Project Time & Cost, Inc. 2727 Paces Ferry Road, Suite 1-1200 Atlanta, Georgia 30339 March 14, 2008 TOC - 1 Table of Contents Executive Summary ............................................................................................................. i 1.0 Introduction................................................................................................................ 1 1.1 Vision for Best-in-Class Project Management Initiative ........................................ 1 1.2 Strategy for Achieving BICPM ..............................................................................

195

Managing Carbon Regulatory Risk in Utility Resource Planning: Current  

NLE Websites -- All DOE Office Websites (Extended Search)

Managing Carbon Regulatory Risk in Utility Resource Planning: Current Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States Title Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States Publication Type Report Year of Publication 2009 Authors Barbose, Galen L., Ryan H. Wiser, Amol Phadke, and Charles A. Goldman Pagination 28 Date Published 03/2009 Publisher LBNL City Berkeley Keywords carbon emissions, electric utilities, electricity markets and policy group, energy analysis and environmental impacts department, power system planning Abstract Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demandside resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers

196

National Ignition Facility Cryogenic Target Systems Interim Management Plan  

SciTech Connect

Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

Warner, B

2002-04-25T23:59:59.000Z

197

Hanford Site waste management and environmental restoration integration plan  

SciTech Connect

The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

Merrick, D.L.

1990-04-30T23:59:59.000Z

198

MTRG/Ascension Management Plan 2002 SECTION 5: THREATS AND RECOMMENDED MANAGEMENT  

E-Print Network (OSTI)

MTRG/Ascension Management Plan 2002 14 SECTION 5: THREATS AND RECOMMENDED MANAGEMENT and control of pet cats 8) Continuation of ban on harvest of turtle products We give an account of all threats.1 General Habitat Degradation 5.1.1. Mining of Beach Sand 5.1.2. Light Pollution 5.1.3 Threat of Fuel Spill

Exeter, University of

199

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network (OSTI)

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

200

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management  

E-Print Network (OSTI)

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management Degrees N 103 79 89 111 13 #12;DEPARTMENT =150201 Parks Recreation and Tourism Management State

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Native American Initiative Short Course Management Plan  

SciTech Connect

A training program is outlined for members of Native American tribes having an interest in working in the oil and gas industry. Also, the program will assist tribes whose lands have oil and gas resources to become more familiar with the industry and technology necessary to develop their resources. The proposed program will contribute to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined is for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the spring of 1995 to 26 tribes or tribal agencies which were identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes include the Osage, Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapaho, and Ute Mountain Ute. The results of the survey are included in a table.The training will be conducted at various locations by BDM-Oklahoma technical staff, which , includes geologists, exploration and drilling specialists, oil and gas production specialists, environmental policy specialists, and contract specialists. The proposed training schedule offers three workshops per year and includes those courses identified in the survey by the tribes. The schedule initially proposed in April 1995 has been modified in order to offer training identified by the tribes in the most cost-effective manner. Participants will be able to take two courses, and travel costs will be minimized. A schedule is included in Table 2-1. Contracts have been initiated with several tribes to schedule a training workshop at various tribal locations. Currently, discussions are underway with the Hopi, Ute, Apache, and Osage tribes. Each of the tribal leaders are presenting the training program to their respective councils. The training offered will be a continuation of the workshop started in October, 1996. Modifications to the course content will be integrated into the presentations to meet specific tribal needs. These special technology needs will be identified through discussions with tribal leaders and council members.

Carroll, H.B.

1999-04-27T23:59:59.000Z

202

Waste Isolation Pilot Plant land management plan  

SciTech Connect

On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

NONE

1996-05-01T23:59:59.000Z

203

Rainwater Wildlife Area Management Plan : Executive Summary.  

SciTech Connect

The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

2002-02-01T23:59:59.000Z

204

SAPHIRE 8 Software Configuration Management Plan  

SciTech Connect

The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

Curtis Smith

2010-01-01T23:59:59.000Z

205

Waste Isolation Pilot Plant Land Management Plan DOE/WIPP-93...  

NLE Websites -- All DOE Office Websites (Extended Search)

Waste Isolation Pilot Plant Land Management Plan DOEWIPP-93-004 Reprint 01082013 Waste Isolation Pilot Plant Land Management Plan DOEWIPP-93-004 2 This page intentionally left...

206

Long-range master plan for defense transuranic waste management  

SciTech Connect

The Long Range Master Plan for the Defense Transuranic Waste Program (DTWP), or ''Master Plan,'' details current TRU waste management plans and serves as a framework for the DTWP. Not all final decisions concerning activities presented in the Master Plan have been made (e.g., land withdrawal legislation, the WIPP Compliance and Operational Plan and the TRUPACT Certificate of Compliance). It is the goal of the DTWP to end interim storage and achieve permanent disposal of TRU waste. To accomplish this goal, as much TRU waste as possible will be certified to meet the WIPP Acceptance Criteria (WAC). The certified waste will then be disposed of at WIPP. The small quantity of waste which is not practical to certify will be disposed of via alternative methods that require DOE Headquarters approval and shall comply with the National Environmental Policy Act requirements and EPA/State Regulations. The definition of TRU waste is ''without regard to source or form, waste that is contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years and concentrations greater than 100 nanocuries/gram (nCi/g) at the time of assay. Heads of Field Elements can determine that other alpha contaminated wastes, peculiar to a specific site, must be managed as transuranic waste.''

Not Available

1988-12-01T23:59:59.000Z

207

ARM - Blog Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2013 [ARM Aerial Facility, ARM Mobile Facility 1, Blog, Field 8, 2013 [ARM Aerial Facility, ARM Mobile Facility 1, Blog, Field Notes, TCAP] TCAP Updates: A New Instrument and Cold Weather Bookmark and Share Editor's note: Dr. Larry Berg is the lead scientist for the Two-Column Aerosol Project. The ARM Mobile Facility site, deployed at Truro, Massachusetts, is shown here in an earlier and warmer time of the year. The ARM Mobile Facility site, deployed at Truro, Massachusetts, is shown here in an earlier and warmer time of the year. We are back on Cape Cod for the second TCAP intensive operations period, which we abbreviate as IOP. The weather conditions have been challenging (more on that later), but we have managed to get in a number of good research flights between the storms. We made one important change to the G-1 aircraft for the second IOP, and that was to include a special inlet

208

NYPA, Entergy begin nuclear management services plan  

SciTech Connect

The New York Power Authority (NYPA) and Entergy Corp. of New Orleans, La., announced recently the signing of a memorandum of understanding as a step toward a contract for Entergy to provide management services to NYPA`s two nuclear power plants. The agreement is the first of its kind. NYPA is the nation`s largest state-owned electric utility and supplier of one-quarter of New York`s electricity. Its nuclear plants are Indian Point 3 (IP3) in Buchanan, Westchester County, and James A. FitzPatrick in Scriba, Oswego County. Entergy is a utility holding company and its subsidiary, Entergy Operations Inc., is widely recognized as one of the leading nuclear operators in the United States. {open_quotes}NYPA`s nuclear plants are assets that belong to the people of New York,{close_quotes} said C.D. {open_quotes}Rapp{close_quotes} Rappleyea, NYPA`s chairman and CEO. {open_quotes}Our alliance with Entergy can provide the people of this state with added assurance that these plants will operate with the highest level of safety and efficiency.{close_quotes} FitzPatrick, an 800 MW boiling water reactor, has operated since 1975 and IP3, a 980 MW pressurized water reactor, since 1976. Although both are currently running well, they have had problems in recent years, and IP3 is on the US Nuclear Regulatory Commission`s (NRC) list of plants requiring increased regulatory attention. Entergy operated both types of reactors, has three single-unit sites like NYPA`s and is experienced in operating plants for different utility owners.

NONE

1996-10-01T23:59:59.000Z

209

ARM - ARM at AGU 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance ARM at AGU 2011 ARM at AGU User...

210

The ORNL Surplus Facilities Management Program Long Range Plan  

SciTech Connect

The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

Myrick, T.E.

1984-09-01T23:59:59.000Z

211

SPORT MANAGEMENT, RECREATION, AND TOURISM TOURISM, LEISURE, AND EVENT PLANNING (TLEP) MAJOR  

E-Print Network (OSTI)

1 SPORT MANAGEMENT, RECREATION, AND TOURISM DIVISION TOURISM, LEISURE, AND EVENT PLANNING (TLEP...................................................................................................................23 Examples of Tourism Field Experie

Moore, Paul A.

212

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

213

ARM - Lesson Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Western Pacific Estimating Local Sea Level Activity Oceans Tropical Western Pacific Ocean Currents Activity Oceans Tropical Western Pacific Past Sea Level Data Activity...

214

ARM - Lesson Plans: Winds  

NLE Websites -- All DOE Office Websites (Extended Search)

or group of students will need the following: Balloon (long balloons or round ones) Bicycle pump to blow up the balloons (or blow them up yourself) Important Points to...

215

ARM - Lesson Plans: Microclimate  

NLE Websites -- All DOE Office Websites (Extended Search)

the following: Large white piece of paper or chalkboard Pencils and erasers or chalk Thermometer Important Points to Understand Have you ever noticed how much cooler it is in the...

216

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2006 [Facility News] 18, 2006 [Facility News] ARM External Data Center Celebrates Ten Years of Service Bookmark and Share External Data Center was recognized for 10 years of service External Data Center was recognized for 10 years of service In celebration of its tenth year of operation, the ARM External Data Center (XDC), which is managed by Brookhaven National Laboratory, was recently recognized for its outstanding contribution to the scientific user community. The XDC collects and processes data from other climate monitoring and research programs to supplement the data collected at the ARM sites. ARM provides these data from external sources because they are usually not easily accessible from their original source. ARM Program Director Wanda Ferrell presented XDC manager Richard Wagener

217

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] New Operations Status System Improves Tracking, Reporting Bookmark and Share Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. Environmental conditions at the ARM sites, like this one in Alaska, contribute to the challenge of managing an extensive array of sophisticated instruments. With heavily instrumented research sites around the globe, the ARM faces a daunting operations and reporting challenge. To better track and report the status of the capabilities at these widely disbursed sites, ARM operations staff recently completed the development of a comprehensive Operations Status System (OSS). By serving as a central collection point for all ARM

218

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 15, 2008 [Facility News] September 15, 2008 [Facility News] Global Earth Observations Portal Provides Gateway to ARM Data Bookmark and Share The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. Data obtained at the ARM sites are freely available to users worldwide through the ARM Data Archive. In August, ARM added another entry point to its data collection by registering the ARM Program and Data Archive as

219

Towards an Integrated Planning and Adaptive Resource Management Architecture for Distributed Real-time Embedded Systems  

E-Print Network (OSTI)

propose new goals/objectives. Conventional resource management approaches, such as end-to-end task. Solution approach Integrated planning and adap- tive resource management. To address the planningTowards an Integrated Planning and Adaptive Resource Management Architecture for Distributed Real

Koutsoukos, Xenofon D.

220

SECTION 50 Table of Contents 50 Lake Rufus Woods Management Plan .........................................................2  

E-Print Network (OSTI)

50-1 SECTION 50 ­ Table of Contents 50 Lake Rufus Woods Management Plan .........................................................2 50.1 Summary of Lake Rufus Woods Assessment and Limiting Factors ...........................2 50 .........................................................................28 #12;50-2 50 Lake Rufus Woods Management Plan The Lake Rufus Woods Subbasin Management Plan

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated Waste Treatment Unit GFSI Risk Management Plan  

SciTech Connect

This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

W. A. Owca

2007-06-21T23:59:59.000Z

222

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

Peck, L.G.

1996-02-06T23:59:59.000Z

223

ARM - Events Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2007 [Events] , 2007 [Events] Climate Scientists Cool Their Heels at Science Team Meeting in Monterey Bookmark and Share Nearly 300 participants from countries as far away as Japan, Australia, and Finland attended the 2007 ARM Science Team Meeting. Nearly 300 participants from countries as far away as Japan, Australia, and Finland attended the 2007 ARM Science Team Meeting. A spring mix of sunny skies and stormy weather provided an appropriate setting for the Seventeenth Atmospheric Radiation Measurement (ARM) Program Science Team Meeting, held March 26 through March 30 in Monterey, California. Held annually since 1990, this meeting brings together ARM scientists, ARM infrastructure staff, and user facility researchers to review program progress and plan future activities.

224

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

225

The interactive on-site inspection system: An information management system to support arms control inspections  

SciTech Connect

The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

1996-12-01T23:59:59.000Z

226

Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)  

SciTech Connect

The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

Higginson, M.C.

1994-10-01T23:59:59.000Z

227

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

228

Legacy Management CERCLA Sites Quality Assurance Project Plan  

SciTech Connect

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

none,

2007-05-03T23:59:59.000Z

229

Soil Management Plan for the Y-12 Plant  

SciTech Connect

Construction activities at the US Department of Energy (DOE) Y-12 Plant have often required the excavation or other management of soil within the facility. Because some of this soil may be contaminated, Martin Marietta Energy Systems, Inc. (Energy Systems) adopted specific policies to ensure the proper management of contaminated or potentially contaminated soil at the plant. Five types of contaminated or potentially contaminated soil are likely to be present at the Y-12 Plant: Soil that is within the boundaries of a Comprehensive Response, Compensation, and Liability Act (CERCLA) Area of Contamination (AOC) or Operable Unit (OU); Soil that contains listed hazardous wastes; Soil that is within the boundaries of a RCRA Solid Waste Management Unit (SWMU); Soil that contains polychlorinated biphenyls (PCBS); Soil that contains low-level radioactive materials. The regulatory requirements associated with the five types of contaminated soil listed above are complex and will vary according to site conditions. This Soil Management Plan provides a standardized method for managers to determine the options available for selecting soil management scenarios associated with construction activities at the Y-12 Plant.

Not Available

1993-01-01T23:59:59.000Z

230

Strategic Energy Management Plan For Fort Buchanan, Puerto Rico  

SciTech Connect

This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

Parker, Steven A.; Hunt, W. D.

2001-10-31T23:59:59.000Z

231

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

232

ARM - Procedure for Submitting Science and Research Products to the Data  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationProcedure for Submitting Science and Research DocumentationProcedure for Submitting Science and Research Products to the Data Archive Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Procedure for Submitting Science and Research Products to the Data Archive The Principal Investigator (PI) establishes contact with an ARM Translator to describe the data product. The Translator collects enough information to describe the PI Product within the Translator group; thereby resulting in assignment of the

233

PUREX/UO{sub 3} deactivation project management plan  

SciTech Connect

From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

Washenfelder, D.J.

1993-12-01T23:59:59.000Z

234

Federal Energy Management Program: Energy Security Planning for Sustainable  

NLE Websites -- All DOE Office Websites (Extended Search)

Security Planning for Sustainable Buildings Security Planning for Sustainable Buildings For energy security, Federal facility managers have a responsibility to consider a broad array of potential threats and incident scenarios. An underlying process or methodology is essential to comprehensively and intelligently address all elements of energy security analysis. Given recent blackouts and concerns about vulnerable infrastructure, many public and private organizations are taking steps to ensure reliable power and continuity of operations in the event of future outages. Some government facilities have the capacity to survive short-term power outages, but are now evaluating whether their back-up power capabilities are sufficient to serve their most critical needs during a prolonged outage.

235

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

236

Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standard Review Plan Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation for Facility Operations Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 Table of Contents Objective ......................................................................................................................................... 4 Requirements .................................................................................................................................. 4 Primary References ......................................................................................................................... 6

237

RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site  

SciTech Connect

This document describes the interim status groundwater monitoring plan for Waste Management Area A-AX.

Narbutovskih, Susan M.; Horton, Duane G.

2001-01-18T23:59:59.000Z

238

AMIE (ARM MJO Investigation Experiment): Observations of the Madden-Julian Oscillation for Modeling Studies Science Plan  

SciTech Connect

Deep convection in the tropics plays an important role in driving global circulations and the transport of energy from the tropics to the mid-latitudes. Understanding the mechanisms that control tropical convection is a key to improving climate modeling simulations of the global energy balance. One of the dominant sources of tropical convective variability is the Madden-Julian Oscillation (MJO), which has a period of approximately 3060 days. There is no agreed-upon explanation for the underlying physics that maintain the MJO. Many climate models do not show well-defined MJO signals, and those that do have problems accurately simulating the amplitude, propagation speed, and/or seasonality of the MJO signal. Therefore, the MJO is a very important modeling target for the ARM modeling community geared specifically toward improving climate models. The ARM MJO Investigation Experiment (AMIE) period coincides with a large international MJO initiation field campaign called CINDY2011 (Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011) that will take place in and around the Indian Ocean from October 2011 to January 2012. AMIE, in conjunction with CINDY2011 efforts, will provide an unprecedented data set that will allow investigation of the evolution of convection within the framework of the MJO. AMIE observations will also complement the long-term MJO statistics produced using ARM Manus data and will allow testing of several of the current hypotheses related to the MJO phenomenon. Taking advantage of the expected deployment of a C-POL scanning precipitation radar and an ECOR surface flux tower at the ARM Manus site, we propose to increase the number of sonde launches to eight per day starting in about mid-October of the field experiment year, which is climatologically a period of generally suppressed conditions at Manus and just prior to the climatologically strongest MJO period. The field experiment will last until the end of the MJO season (typically March), affording the documentation of conditions before, during, and after the peak MJO season. The increased frequency of sonde launches throughout the experimental period will provide better diurnal understanding of the thermodynamic profiles, and thus a better representation within the variational analysis data set. Finally, a small surface radiation and ceilometer system will be deployed at the PNG Lombrum Naval Base about 6 km away from the ARM Manus site in order to provide some documentation of scale variability with respect to the representativeness of the ARM measurements.

Long, C; Del Genio, A; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Klein, S; Leung, L Ruby; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Wu, X; Xie, S

2010-03-22T23:59:59.000Z

239

National ignition facility environment, safety, and health management plan  

SciTech Connect

The ES&H Management Plan describes all of the environmental, safety, and health evaluations and reviews that must be carried out in support of the implementation of the National Ignition Facility (NIF) Project. It describes the policy, organizational responsibilities and interfaces, activities, and ES&H documents that will be prepared by the Laboratory Project Office for the DOE. The only activity not described is the preparation of the NIF Project Specific Assessment (PSA), which is to be incorporated into the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (PEIS). This PSA is being prepared by Argonne National Laboratory (ANL) with input from the Laboratory participants. As the independent NEPA document preparers ANL is directly contracted by the DOE, and its deliverables and schedule are agreed to separately with DOE/OAK.

NONE

1995-11-01T23:59:59.000Z

240

Integration of reclamation and tailings management in oil sands surface mine planning  

Science Journals Connector (OSTI)

The processing of oil sands generates large volumes of slurry, known as tailings, that is impounded in tailings ponds. Oil sands operators are committed to develop reclamation plans to ensure that the mine site is restored to a natural or economically ... Keywords: Integer programming, Mine planning, Oil sands, Open-pit mining, Reclamation planning, Strategic planning, Tailings management

Mohammad Mahdi Badiozamani; Hooman Askari-Nasab

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological  

E-Print Network (OSTI)

.....................................................................................................................................................1 Transition to Electronic Data ManagementQuality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey

242

Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314  

SciTech Connect

The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

243

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect

The Configuration Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable configuration management practices described in HNF-0842, Volume 111, Section 3.1, ''Configuration Management Implementation''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

244

Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect

The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

245

SUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies Case Management  

E-Print Network (OSTI)

Development 3 See note 1 on page 2 HDFS 25512 Management of Family Resources 3 HDFS 34031 Cultural DiversitySUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management for Individuals

Sheridan, Scott

246

Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers  

SciTech Connect

Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers.

DALE, R.N.

2000-05-01T23:59:59.000Z

247

Savannah River Site Interim Waste Management Program Plan FY 1991--1992  

SciTech Connect

The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

Chavis, D.M.

1992-05-01T23:59:59.000Z

248

ARM - Instrument - swacr  

NLE Websites -- All DOE Office Websites (Extended Search)

govInstrumentsswacr govInstrumentsswacr Documentation SWACR : Instrument Mentor Monthly Summary (IMMS) reports SWACR : Data Quality Assessment (DQA) reports ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Instrument : W-Band (95 GHz) ARM Cloud Radar, mounted to scan (SWACR) Instrument Categories Cloud Properties Output Datastreams swacrblrhi : S-WACR Boundary-layer Range-Height Indicator scan swacrcal : S-WACR calibration information swacrcwrhi : S-WACR Cross-Wind Range-Height Indicator scan swacrfpt : S-WACR - Fixed PoinTing mode swacrhsrhi : S-WACR Horizon-to-horizon Range-Height Indicator scan swacrppi : S-WACR Plan Position Indicator scan swacrspeccmaskcopol : S-WACR ARM Cloud Radar, filtered spectral

249

Amendment 94 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area to  

E-Print Network (OSTI)

Impact Review/Final Regulatory Flexibility Analysis analyzes Amendment 94 to the Fishery Management Plan Island Habitat Conservation Area Environmental Assessment/ Regulatory Impact Review/ Final RegulatoryAmendment 94 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands

250

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

251

Environmental Guidelines for Development of Cultural Resource Management Plans--Update  

Directives, Delegations, and Requirements

This Guide provides guidelines for the development of an individual Cultural Resource Management Plan for each DOE facility and program. Canceled by DOE N 251.82.

2004-09-22T23:59:59.000Z

252

Microsoft Word - Final DOE-CBFO-01-3107 PDP Management Plan_rev...  

NLE Websites -- All DOE Office Websites (Extended Search)

PROGRAM MANAGEMENT PLAN Revision 7 November 2014 U.S. Department of Energy Carlsbad Field Office TRU Sites and Transportation Division This document supersedes DOE...

253

Bureau of Land Management - Examples of Non-LUP Prep Plan or...  

Open Energy Info (EERE)

LandManagement-ExamplesofNon-LUPPrepPlanorEISPrepPlan&oldid793329" Categories: References Geothermal References Solar References Utilities References Bulk Transmission...

254

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Energy.gov (U.S. Department of Energy (DOE))

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

255

Best-In-Class Project Management Initiative Corporate Implementation Plan  

Energy.gov (U.S. Department of Energy (DOE))

To continue Project Management and Contract Management Improvements, DOE EM has developed a vision for building a "Best-in-Class" Project Management and Contract Management organization. Click...

256

ARM - Posters  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Reports Program Fact Sheets Campaign Backgrounders Education and Outreach Posters Brochures Research Highlights Summaries Posters The ARM Image Library contains...

257

ARM - Brochures  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Reports Program Fact Sheets Campaign Backgrounders Education and Outreach Posters Brochures Research Highlights Summaries Brochures Please contact armpubs@arm.gov for...

258

ARM - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

HomeroomPublications Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM...

259

ARM - Kiosks  

NLE Websites -- All DOE Office Websites (Extended Search)

HomeroomKiosks Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global...

260

EIS-0480: Long-Term Experimental and Management Plan for the Operation of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Long-Term Experimental and Management Plan for the 0: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam SUMMARY Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 6, 2011 EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Savannah River Site Interim Waste Management Program Plan FY 1991--1992  

SciTech Connect

The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

Chavis, D.M.

1992-05-01T23:59:59.000Z

262

ARM - VAP Process - aod  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsaod Productsaod Documentation & Plots Technical Report (1) Technical Report (2) Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Aerosol Optical Depth (AOD) Instrument Categories Derived Quantities and Models The core purpose of the ARM Facility is to reduce uncertainties in climate model predictions. A dominant source of uncertainty in these models is the radiative impact of aerosols, which has spawned a major effort in ARM to measure aerosol properties. The Aerosol Optical Depth (AOD) value-added product (VAP) is concerned with several important aerosol radiative properties. The most important of these is the aerosol optical depth (AOD), which is a measure of the total aerosol

263

ARM - VAP Process - mwrret  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsmwrret Productsmwrret Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : MWR Retrievals (MWRRET) Instrument Categories Cloud Properties, Atmospheric Profiling, Derived Quantities and Models Image - sample data plot Image - sample data plot There are 2-channel (23.8 and 31.4GHz) microwave radiometers (MWRs) deployed at each ARM Climate Research Facility site. The observed brightness temperatures from these MWRs can be inverted to retrieve precipitable water vapor (PWV) and cloud liquid water path (LWP), both of which are critical variables to understanding radiative transfer in the atmosphere and clouds. The ARM Facility routinely has provided retrieved

264

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

History Tool Records Changes to Datastreams History Tool Records Changes to Datastreams Bookmark and Share As the name implies, a "datastream" is a continuous record of a specific type of data that is collected and saved in a time series. Occasionally, modifications are needed to update or correct a datastream. Knowing the history of changes to a datastream is a critical issue for ARM data users. Recognizing this need, the ARM Data Management Facility (DMF) created a tool to record the history of every datastream for every instrument from every ARM site since the beginning of the ARM Program. The History of Datastream tool looks for changes to the data object design (DOD) files weekly and creates a history link for DODs that have changed. By selecting "history," users will have access to the old DOD file and a file outlining the differences.

265

ARM - VAP Product - armbeatm  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsarmbearmbeatm Productsarmbearmbeatm Documentation Data Management Facility Plots (Quick Looks) Citation DOI: 10.5439/1095313 DOI: 10.5439/1039931 Central Facility, Lamont, OK (SGP C1) DOI: 10.5439/1039932 Central Facility, Barrow AK (NSA C1) DOI: 10.5439/1039933 Central Facility, Manus I., PNG (TWP C1) DOI: 10.5439/1039934 Central Facility, Nauru Island (TWP C2) DOI: 10.5439/1039935 Central Facility, Darwin, Australia (TWP C3) [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP Output : ARMBEATM ARMBE: Atmospheric measurements Active Dates 1994.01.01 - 2012.12.31 Originating VAP Process ARM Best Estimate Data Products : ARMBE Description The ARM Best Estimate Atmospheric Measurements (ARMBEATM) value-added

266

Business Management and Planning (BMP) Division | U.S. DOE Office of  

NLE Websites -- All DOE Office Websites (Extended Search)

Business Business Management and Planning (BMP) Division Business Policy and Operations (BPO) BPO Home Leadership Organization Chart .pdf file (195KB) Business Management and Planning (BMP) Division SC Systems and Operations (SCSO) Division Contact Information Business Policy & Operations U.S. Department of Energy SC-45/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-0192 F: (301) 903-2481 More Information » Business Management and Planning (BMP) Division Print Text Size: A A A RSS Feeds FeedbackShare Page The Business Management and Planning (BMP) Division provides planning, design, implementation, and overall project management for SC mission-support IT Initiatives such as research grants and financial management systems; network modernization; and IT Strategic and Operational

267

An Economic, Hydrologic, and Environmental Assessment of Water Management Alternative Plans for the South Central Texas Region*1  

E-Print Network (OSTI)

An Economic, Hydrologic, and Environmental Assessment of Water Management Alternative Plans. The economic, hydrologic, and environmental consequences of the "best" choice of regional water management plan, and water management plans. #12;3 An Economic, Hydrologic, and Environmental Assessment of Water Management

McCarl, Bruce A.

268

Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)  

SciTech Connect

NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

Not Available

2015-01-01T23:59:59.000Z

269

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

270

2011 Annual Planning Summary for Environmental Management (EM...  

Energy Savers (EERE)

(EM) More Documents & Publications 2012 Annual Planning Summary for Bonneville Power Administration 2014 Annual Planning Summary for the West Valley Demonstration Project...

271

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientists Convene in Australia to Plan International Cloud Experiment Scientists Convene in Australia to Plan International Cloud Experiment Bookmark and Share During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. Coming from as far away as Italy, Switzerland, and the United States, a 45 member team gathered in Darwin, Australia, in mid-November to discuss plans

272

ARM - SGP Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Science SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Science Overall Objectives The primary goal of the Southern Great Plains (SGP) site is to produce data adequate to support significant research addressing the objectives of the overall ARM Climate Research Facility. These overall objectives, as paraphrased from the ARM Program Plan (DOE 1990), are the following: to describe the radiative energy flux profile of the clear and cloudy atmosphere to understand the processes determining the flux profile

273

Regulatory Guidance Letter 86-10 SUBJECT: Special Area Management Plans (SAMPS)  

E-Print Network (OSTI)

Regulatory Guidance Letter 86-10 SUBJECT: Special Area Management Plans (SAMPS) DATE: October 2 the problems associated with the traditional case-by-case review. Developmental interests can plan the SAMP process as "a comprehensive plan providing for natural resource protection and reasonable coastal

US Army Corps of Engineers

274

SECTION 2 Table of Contents 2 Province Management Plan and Inventory....................................................2  

E-Print Network (OSTI)

2-1 SECTION 2 ­ Table of Contents 2 Province Management Plan and Inventory. The Oversight Committee for the Intermountain Province (IMP) has decided on a ten-year planning horizon, a provincial approach was taken to subbasin planning. As a result, this section of the document presents

275

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

276

Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2  

SciTech Connect

The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

Not Available

1993-12-01T23:59:59.000Z

277

ARM - Datastreams - swacrppi  

NLE Websites -- All DOE Office Websites (Extended Search)

Datastreamsswacrppi Datastreamsswacrppi Documentation Data Quality Plots Citation DOI: 10.5439/1025292 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : SWACRPPI S-WACR Plan Position Indicator scan Active Dates 2009.10.05 - 2011.04.25 Measurement Categories Cloud Properties Originating Instrument W-Band (95 GHz) ARM Cloud Radar, mounted to scan (SWACR) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Current pedestal azimuth position relative to North degrees Azimuth_current ( time ) Rate of pedestal motion in the azimuth degrees/sec Azimuth_scan_rate ( time ) Current pedestal elevation position degrees Elevation_current ( time )

278

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 24, 2013 [Education, Facility News] April 24, 2013 [Education, Facility News] A Twist on TwisterTM: ARM Educational Outreach Participates in Community Science Nights Bookmark and Share This week, the U.S. Department of Energy begins its National Science Bowl competition, a nationwide academic competition that tests students' knowledge in all areas of science. Created 22 years ago in 1991, the DOE National Science Bowl strives to encourage students to excel in mathematics and science and to pursue careers in these fields and is an important part of DOE's STEM (science, technology, engineering and math) education efforts today. The ARM Climate Research Facility supports STEM by participating in public science nights and developing climate related lesson plans to share at these events and via the ARM website.

279

ARM - Recovery Act Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

ActRecovery Act Instruments ActRecovery Act Instruments Recovery Act Logo Subscribe FAQs Recovery Act Instruments Recovery Act Fact Sheet March 2010 Poster (PDF, 10MB) External Resources Recovery Act - Federal Recovery Act - DOE Recovery Act - ANL Recovery Act - BNL Recovery Act - LANL Recovery Act - PNNL Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Recovery Act Instruments These pages provide a breakdown of the new instruments planned for installation among the permanent and mobile ARM sites. In addition, several instruments will be purchased for use throughout the facility and deployed as needed. These are considered "facility spares" and are included in the table below. View All | Hide All ARM Aerial Facility Instrument Title Instrument Mentor Measurement Group Measurements

280

DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2  

SciTech Connect

This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

Gerber, E.W.

1996-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee  

SciTech Connect

The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The HASP is written to make use of past experience and best management practices to eliminate or minimize hazards to workers or the environment from events such as fires, falls, mechanical hazards, or any unplanned release to the environment.

Flynn, N.C. Bechtel Jacobs

2008-04-21T23:59:59.000Z

282

ARM - Article  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2009 [Data Announcements, Facility News] 18, 2009 [Data Announcements, Facility News] Data Available from ARM Mobile Facility Deployment in China Bookmark and Share The Study of Aerosol Indirect Effects in China was anchored by the ARM Mobile Facility in Shouxian and included an additional instrumented site to the east at Lake Taihu and two instrumented sites to the north. All data collected by the ARM Mobile Facility in Shouxian are now publicly available at the Data Archive. In addition, data collected at the northern Zhangye site are in the process of being transmitted to the External Data Center for final formatting and should be available at the Archive by the end of this week. At this time, data acquired at Taihu by ARM instruments and by in-country researcher instruments cannot be made public. In addition, limited airborne

283

ARM - Collaborations  

NLE Websites -- All DOE Office Websites (Extended Search)

govScienceCollaborations govScienceCollaborations Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 Collaborations The ARM Climate Research Facility collaborates extensively with other U.S. Department of Energy (DOE) programs and laboratories, agencies, universities, and private firms in gathering and sharing data. This collaborative approach allows ARM to leverage its investment in instruments, sites, data, and science and to gain the knowledge necessary

284

ARM - Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 1, 2009 Facility News Mobile Facility Begins Marine Cloud Study in the Azores Bookmark and Share Located next to the airport on Graciosa Island, the ARM Mobile Facility's...

285

ARM - Features  

NLE Websites -- All DOE Office Websites (Extended Search)

the Trees-And to the Aerosols Jan 09, 2015 Nine months in the icy, cold forests of Finland was not what the second ARM Mobile Facility (AMF2) was primarily created for, but...

286

Retirement planning in individual assetliability management  

Science Journals Connector (OSTI)

......figures and operational approaches currently in use within...asset and liability management for individual investors...Operations Research and Management Science. New York: Springer...Operations Research and Management Science, chapter 5. New......

Giorgio Consigli; Gaetano Iaquinta; Vittorio Moriggia; Massimo di Tria; Davide Musitelli

2012-10-01T23:59:59.000Z

287

Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan - February 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automated Home Energy Management (AHEM) Automated Home Energy Management (AHEM) Standing Technical Committee Strategic Plan, v2011c - February 2012 Committee Chair: 2011 Kurt Roth Fraunhofer 2012 Lieko Earle, Bethany Sparn NREL 2 Prioritization of Gaps, Barriers and Needs The following table lists a prioritization for the Gaps, Barriers and Needs included in the Building America AHEM STC Strategic Plan. Table 1. Gaps and Barriers for AHEM STC. Rank Description 1 Energy Savings / ROI Insufficiently Quantified 2 Lack of Consumer Awareness of AHEM Products 3 Low Interest in Managing Energy Use 4 Complexity of AHEM Products Contents Summary of AHEM STC Strategic Plan ..................................................................................................................... 3

288

ARM - VAP Process - baebbr  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsbaebbr Productsbaebbr Documentation & Plots Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Best-Estimate Fluxes From EBBR Measurements and Bulk Aerodynamics Calculations (BAEBBR) Instrument Categories Derived Quantities and Models The BAEBBR VAP calculates the bulk aerodynamic latent and sensible heat fluxes from Energy Balance Bowen Ratio (EBBR) Station meteorological measurements and uses these in place of the EBBR flux measurements when the Bowen ratio is between -1.6 and -0.45. The resultant dataset is considered to provide the "best estimate" of the diurnal cycle of fluxes. For more details, see http://science.arm.gov/vaps/baebbr.stm.

289

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Team Scouts Graciosa Island for 2009 Mobile Facility Deployment Site Bookmark and Share A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens Indications from a scouting trip by the ARM Mobile Facility (AMF) science and operations management team are that an excellent site for the 2009 deployment may have been found. From April 8 through April 16, the team traveled to Graciosa Island in the Azores to scout sites for the Clouds, Aerosol, and Precipitation in the Marine Boundary Layer (CAP-MBL) field

290

ARM - VAP Product - armbecldrad  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsarmbearmbecldrad Productsarmbearmbecldrad Documentation Data Management Facility Plots (Quick Looks) Citation DOI: 10.5439/1095314 DOI: 10.5439/1039926 Central Facility, Lamont, OK (SGP C1) DOI: 10.5439/1039927 Central Facility, Barrow AK (NSA C1) DOI: 10.5439/1039928 Central Facility, Manus I., PNG (TWP C1) DOI: 10.5439/1039929 Central Facility, Nauru Island (TWP C2) DOI: 10.5439/1039930 Central Facility, Darwin, Australia (TWP C3) [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP Output : ARMBECLDRAD ARMBE: Cloud Radiation measurements Active Dates 1996.01.01 - 2011.01.01 Originating VAP Process ARM Best Estimate Data Products : ARMBE Description The ARMBE Cloud Radiation (ARMBECLDRAD) VAP contains a best estimate of

291

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Backup Software Improves Processing, Reliability at Data Management New Backup Software Improves Processing, Reliability at Data Management Facility Bookmark and Share Real-time data from all three of the ARM Climate Research Facility sites (North Slope of Alaska, Southern Great Plains, and Tropical Western Pacific) are collected and processed at the ARM Climate Research Facility Data Management Facility (DMF) each day. Processing involves the application of algorithms for performing simple averaging routines, qualitative comparisons, or more complicated experimental calculations. With continual advances in computer technology, keeping up with the volume and pace of incoming data is a daunting challenge. And because the remote sites do not provide backups, reliable backups of these data at the DMF are critical. In addition, significant numbers of value-added datasets are

292

Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.  

SciTech Connect

This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

Childs, Allen

2002-03-01T23:59:59.000Z

293

EFCOG Integrated Safety Management Work Planning and Control  

Energy.gov (U.S. Department of Energy (DOE))

Presenter: Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management

294

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

295

Tank waste remediation system privatization infrastructure program, configuration management implementation plan  

SciTech Connect

This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

Schaus, P.S.

1998-08-18T23:59:59.000Z

296

ARM - Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News] 27, 2009 [Facility News] Arrival of Recovery Act Funds Sets Wheels In Motion Bookmark and Share So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. Through the American Recovery and Reinvestment Act of 2009 (aka stimulus), the Department of Energy's Office of Science received $1.2 billion. In late May, DOE released approximately $54 million-90 percent-of the $60 million allocated to the ARM Climate Research Facility. During the next 18 months, the ARM Climate Research Facility will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several

297

ARM - Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News, Feature Stories and Releases] 27, 2009 [Facility News, Feature Stories and Releases] Ceremony in the Azores Recognizes Scientific Collaborations Bookmark and Share A mix of green pastures and isolated white-housed villages dot the landscape of Graciosa Island. The ARM Mobile Facility will be located near the airport at the northern end of the island. A mix of green pastures and isolated white-housed villages dot the landscape of Graciosa Island. The ARM Mobile Facility will be located near the airport at the northern end of the island. In a signing ceremony at the Laboratorio Regional Engenharia Civil in Ponta Delgada, the Azores, government officials from the United States and Portugal formally recognized agreements for scientific collaboration related to the ARM Mobile Facility deployment on Graciosa Island. The

298

Energy Planning And Management Program, Wapa Programmatic Doe/eis-0182  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995/01eis0182_ep.html[6/27/2011 10:56:10 AM] 1995/01eis0182_ep.html[6/27/2011 10:56:10 AM] Energy Planning and Management Program Environmental Impact Statement DOE/EIS-0182 Western Area Power Administration Energy Planning and Management Program Environmental Impact Statement Energy Planning And Management Program, Wapa Programmatic Doe/eis-0182 file:///I|/Data%20Migration%20Task/EIS-0182-FEIS-1995/02eis0182_cov.html[6/27/2011 10:56:06 AM] COVER SHEET Title: Energy Planning and Management program Agency: Western Area Power Administration Contact: Mr. Robert Fullerton Western Area Power Administration

299

Microsoft Word - DOE-CBFO-01-3107 PDP Management Plan_Final  

NLE Websites -- All DOE Office Websites (Extended Search)

CBFO-01-3107 CBFO-01-3107 PERFORMANCE DEMONSTRATION PROGRAM MANAGEMENT PLAN Revision 6 June 2013 U.S. Department of Energy Carlsbad Field Office Office of the National TRU Program This document supersedes DOE/CBFO-01-3107, Revision 5 DOE/CBFO-01-3107 Revision 6 PDP Management Plan June 2013 2 Performance Demonstration Program Management Plan DOE/CBFO-01-3107 Revision 6 June 2013 Approved By: //signature on file// Date: 6-14-13 Office Director Office of the National TRU Program Concurred By: //signature on file// Date: 6-14-13 Office Director Office of Quality Assurance Prepared By: //signature on file// Date: 6-14-13 PDP Appointee Office of the National TRU Program DOE/CBFO-01-3107 Revision 6 PDP Management Plan June 2013

300

2010 Annual Workforce Analysis and Staffing Plan Report- Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

2012 Annual Workforce Analysis and Staffing Plan Report- Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

302

2012 Annual Workforce Analysis and Staffing Plan Report- Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

303

2011 Annual Workforce Analysis and Staffing Plan Report- Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

304

2013 Annual Workforce Analysis and Staffing Plan Report- Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

305

2013 Annual Workforce Analysis and Staffing Plan Report- Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

306

Information Resources Management Strategic Plan Appendix FY2014...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE IRM Strategic Plan outlines DOE's approach to maturing its IT portfolio with a service oriented approach. The following IRM Objective supports Requirement HXXA: 1.2 Create...

307

UAV/UAS path planning for ice management information gathering.  

E-Print Network (OSTI)

??The key objective of this work is the proposition of the path planning strategy for unmanned aerial vehicle (UAV) intended for information gathering in Arctic (more)

Stalmakou, Artsiom

2011-01-01T23:59:59.000Z

308

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

deployments. The online ARM sites map was recently integrated with Google(tm) Maps API technology to enhance ARM website user's experience. Web visitors and ARM Data Archive...

309

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

From Coastal Clouds to Desert Dust: ARM Mobile Facility Headed to Africa Bookmark and Share ARM operations staff prepare the ARM Mobile Facility in Point Reyes, California, for...

310

The integrated tank waste management plan at Oak Ridge National Laboratory  

SciTech Connect

DOE`s Environmental Management Program at Oak Ridge has developed an integrated tank waste management plan that combines the accelerated deployment of innovative technologies with an aggressive waste transfer schedule. Oak Ridge is cleaning out waste from aging underground storage tanks in preparation of waste processing, packaging and final safe disposal. During remediation this plan will reduce the risk of environmental, worker, and civilian exposure, save millions of dollars, and cut years off of tank remediation schedules at Oak Ridge.

Billingsley, K. [STEP, Inc., Oak Ridge, TN (United States); Mims, C. [Dept. of Energy, Oak Ridge, TN (United States). Oak Ridge Operations Office; Robinson, S. [Oak Ridge National Lab., TN (United States)

1998-06-01T23:59:59.000Z

311

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Directives, Delegations, and Requirements

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

312

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Energy.gov (U.S. Department of Energy (DOE))

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

313

An analysis of stakeholder perspectives on Texas Regional Water Planning and Management  

E-Print Network (OSTI)

management strategies and planning considerations. The purpose is to identify points of consensus and points of divergence in order to develop a water plan for Texas that is fair and equitable. When a conflict is interest-based, as it is in the case of water...

Collins, Kimberley A

2000-01-01T23:59:59.000Z

314

Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee  

SciTech Connect

This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.

None

2005-03-02T23:59:59.000Z

315

ARM - Field Campaign - Aircraft Carbon  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsAircraft Carbon govCampaignsAircraft Carbon Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Aircraft Carbon 2006.07.01 - 2008.09.30 Lead Scientist : Margaret Torn For data sets, see below. Description Airborne trace-gas measurements at ARM-SGP provided valuable data for addressing carbon-cycle questions highlighted by the US Climate Change Research Program and the North American Carbon Program. A set of carbon-cycle instruments and sample collection systems were added to an ARM-managed aircraft at ARM-SGP user facility. A separate (in-place) grant covered the cost of developing the instrument systems, analyzing the data, and ingesting all data to the ARM data archives. In the short-term (~1 y) we had two priorities. The first was to acquire

316

ARM - Field Campaign - Unmanned Aerospace Vehicle (UAV) IOP  

NLE Websites -- All DOE Office Websites (Extended Search)

govCampaignsUnmanned Aerospace Vehicle (UAV) IOP Campaign Links ARM UAV Program Science Plan ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note...

317

2014 Annual Planning Summary for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Environmental Management.

318

2014 Annual Planning Summary for the Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Legacy Management..

319

2013 Annual Planning Summary for the Office of Legacy Management  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of Legacy Management .

320

ARM - Education  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterEducation CenterEducation Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance Education Education Archive » Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Apr 25, 2013 School break means vacation, and around Cape Cod, that often means a trip to the seashore. On April 17, families looking for fun and educational outdoor activities spent several hours at Cape Cod National Seashore's Highlands Center for Junior Ranger Day. They were drawn to an event announcement in the park activities newsletter that [...]

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 1, 2012 [Facility News] March 1, 2012 [Facility News] Arctic Storm Samples Show Relationship Between Sea Ice and Precipitation Over Land Bookmark and Share Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. As an important component of Earth's climate system, sea ice has a particularly strong influence on the Arctic sea surface temperature, evaporation, and reflectivity, or "albedo." The critical relationship among sea ice, evaporation, and precipitation is linked to a number of

322

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Bigger, Better Cessna Ready to Record Aerosol and Carbon Cycle Data Bigger, Better Cessna Ready to Record Aerosol and Carbon Cycle Data Bookmark and Share Replacing the smaller Cessna 172, the new turbo-charged Cessna 206 prepares for departure to Ponca City, Oklahoma, where it will be managed by Greenwood Aviation. Replacing the smaller Cessna 172, the new turbo-charged Cessna 206 prepares for departure to Ponca City, Oklahoma, where it will be managed by Greenwood Aviation. To meet new requirements in the airborne aerosol and carbon-cycle measurements taken over ARM's Southern Great Plains (SGP) site, a new Cessna Turbo 206 is replacing the smaller Cessna 172XP. The new aircraft has been contracted by ARM to conduct combined in situ aerosol profiling and airborne carbon measurements for the next two years. Airborne measurements of carbon cycle trace gases at the SGP will provide data to

323

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Tourism Introduction to Global Tourism 3 Offered in fall only HM 13024 Introduction to Hospitality Management 2 US; offered in fall only RPTM 36060 Commercial Recreation and Tourism 3 Offered in fall only RPTM 36075

Sheridan, Scott

324

Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan  

SciTech Connect

The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

MITCHELL, R.L.

2000-01-10T23:59:59.000Z

325

Recommended Academic Plan for Landscape Contracting Major -Management Option (LSCPE/MGMT) Commonwealth Campuses  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Management Option (LSCPE Applications for Landscape Contracting 2 MKTG 220 Introduction to Selling Techniques or AG BM 220 Agribusiness 217 Landscape Soil and Water Management 3 HORT 250 Landscape Contracting Design/Build Principles 3

Guiltinan, Mark

326

MATERIAL FLUX ANALYSIS (MFA) FOR PLANNING OF DOMESTIC WASTES AND WASTEWATER MANAGEMENT  

E-Print Network (OSTI)

i MATERIAL FLUX ANALYSIS (MFA) FOR PLANNING OF DOMESTIC WASTES AND WASTEWATER MANAGEMENT: CASE nutrient management, organic waste, wastewater and septage that contained high concentration of nutrients area. The nitrogen fluxes in relation to organic waste and wastewater were chosen as indicators

Richner, Heinz

327

Capacity planning and change management in an aerospace overhaul cell  

E-Print Network (OSTI)

Purpose - This thesis analyzes the transformation of the Small Components Cell in Pratt & Whitney's aftermarket division through lean manufacturing techniques. The thesis focuses on use of a labor capacity planning model, ...

Walker, David, M.B.A. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

328

State Lands Management Plan Randell Mound at Pineland  

E-Print Network (OSTI)

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

329

State Lands Management Plan Clark Island at Cedar Key  

E-Print Network (OSTI)

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

330

2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM)  

Energy.gov (U.S. Department of Energy (DOE))

Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24...

331

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Burgard, K.G.

1998-09-24T23:59:59.000Z

332

INL Site Executable Plan for Energy and Transportation Fuels Management  

SciTech Connect

It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

Ernest L. Fossum

2008-11-01T23:59:59.000Z

333

Microsoft Word - OccMed Recompete Contract Management Plan APM...  

NLE Websites -- All DOE Office Websites (Extended Search)

PNSO Pacific Northwest Site Office PWS Performance Work Statement QA Quality Assurance RCW Revised Code of Washington RIMS RL Integrated Management System RL Richland...

334

ARM-95-002  

NLE Websites -- All DOE Office Websites (Extended Search)

5-002 5-002 Platforms for Ocean Measurements An ARM Notebook of Buoys, Vessels, and Rigs December 1993 COMMENT DRAFT Prepared by Battelle Marine Sciences Laboratory CONTENTS 1 .0 2 .0 3 .0 Introduction 1 1 .1 1 .2 1 .3 Notebook Origin 1 Organization 1 How to Use this Notebook 1 ARM Ocean Site 3 2 .1 2 .2 Planned Sites 3 Measurement Strategies 3 Measurement and Instrument Requirements 5 3 .1 3 .2 3 .3 3 .4 3 .5 3 .6 3 .7 3 .8 3 .9 3 .10 3 .11 Introduction 5 Surface Meteorological Observations 5 Surface Fluxes 5 Vertical Profiling 5 Solar Irradiance 6 Integrated Liquid and Water Vapor 7 Broadband Solar and Infrared Radiation 8 Radiance Spectrum 10 Vertical Winds and Virtual Temperature and Profiles 11 Whole Sky Imaging 12 Cloud Base Height and Cloud Characteristics 13 4 .0 Platforms 15 4 .1 Vessels

335

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

14, 2012 [Education, Facility News] 14, 2012 [Education, Facility News] ARM Education Receives Seal of Approval Bookmark and Share Resources selected by the Climate Literacy and Energy Awareness Network (CLEAN) must pass an extensive peer-review process to verify the accuracy and currency of the science. Resources selected by the Climate Literacy and Energy Awareness Network (CLEAN) must pass an extensive peer-review process to verify the accuracy and currency of the science. ARM's lesson plan, "Effects of Solar Radiation on Land and Sea" was recently selected for inclusion in the NSF-funded Climate Literacy and Energy Awareness Network's (CLEAN) collection of educational resources. Receipt of the prestigious CLEAN seal means that the selected resource passed an extensive peer-review by educators and scientists to ensure

336

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Experiment Bookmark and Share As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) After more than a year and a half of planning, proposals, and paperwork,

337

DRAFT MANAGEMENT PLAN APPENDIX A-1 Contract Entities and Plan Participants  

E-Print Network (OSTI)

Province (USP) Plan in addition to those contracted by the Northwest Power and Conservation Council (NPCC of three primary elements: Part I. An Assessment of the current and potential physical and biological AND PLAN PARTICIPANTS BOI043620001.DOC/KG A1-2 IDFG organized a technical team of natural resource

338

ARM - Education  

NLE Websites -- All DOE Office Websites (Extended Search)

govEducation govEducation Education Homeroom-Education and Outreach Information Like a rock that slowly wears away beneath the pressure of a waterfall, our climate is almost imperceptibly changing. Glaciers are getting smaller, droughts are lasting longer, and "extreme weather events" like fires, floods, and tornadoes are occurring with greater frequency. Why? To try and answer that question, scientists use data from the Atmospheric Radiation Measurement (ARM) Climate Research Facility. Instruments at the ARM sites around the world collect data about clouds, precipitation, solar energy, and tiny particles in the air called aerosols. Scientists use that data to study the Earth's climate and develop better ways of predicting what the climate will be like in the future.

339

ARM - Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

govInstruments govInstruments Instruments Location Table Contacts Instrument Categories Select below to highlight instruments in specified categories. Aerosols Airborne Observations Atmospheric Carbon Measurements of atmospheric carbon are obtained from samples collected at the Southern Great Plains site. For more information about these measurements, see the ARM Carbon Project website. Now available: Aircraft carbon profile samples These data (and more) are freely available in the ARM Archive. The first time you visit the Archive you will need to create a new account-a relatively short form asking for contact information-you can use right away. Coming soon: Airborne continuous CO2 profile samples Atmospheric Profiling Cloud Properties Derived Quantities and Models Ocean Observations

340

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Disaster Plan Deflects Problems During Downpour Disaster Plan Deflects Problems During Downpour Bookmark and Share A late-winter storm in the Midwest could have wreaked havoc at the ARM Program's Southern Great Plains (SGP) site in northern Oklahoma. Fortunately, the site's Disaster Plan was successfully implemented. SGP's 160-acre Central Facility, the heart of the site, is heavily instrumented to collect and monitor atmospheric data collected from in situ and remote-sensing instrument clusters arrayed throughout the 55,000 square mile site. Although the Central Facility is on the highest point of land in the county, extreme rainfall and flooding on March 4 rendered access roads from the East impassable to vehicular traffic, and the West access road through Lamont was submerged in several locations. Local rainfall amounts

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.  

SciTech Connect

This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

Childs, Allen B.

2002-03-01T23:59:59.000Z

342

Investigation of Project Management Planning Practices for Renovation of Historical Buildings in Urban Contexts Located in Texas  

E-Print Network (OSTI)

This study investigated the relationship between Project Management Planning (PMP) practices and project success for preservation projects of historical significance located in an urban context. The planning for these projects was also emphasized...

Escamilla, Edelmiro

2012-07-16T23:59:59.000Z

343

ARM - Sediment  

NLE Websites -- All DOE Office Websites (Extended Search)

FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Sediment Sediments such as marine sediment, lake sediment, and loess (wind sediment) provide...

344

Urban Forest Management Plan Samuel O. Oludunfe, BSF  

E-Print Network (OSTI)

#101, ISA #WE5889A, State Urban Forester, California Dept. of Forestry & Fire Protection; Charles E Conservation Policies 15 4.2.1. Tree Inventory 15 4.2.2. Tree Pruning and Tree Removal 20 4.2.3. Protection as "...the sustained planning, planting, protection, maintenance, and care of trees, forests, greenspace

Tsien, Roger Y.

345

CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE  

National Nuclear Security Administration (NNSA)

by the U.S. Department of Defense, U.S. Bureau of Land Management (BLM), and the U.S. Fish and Wildlife Service. Routine access to the facility is from U.S. Highway 95....

346

DOE/NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT...  

National Nuclear Security Administration (NNSA)

Services Pantex, LLC Contract Number: DE-AC54-00AL66620 Performance period: October 01, 2013 through September 30, 2014 J D. Woolery P e dent and General Manager B cock & Wilcox...

347

State Solid Waste Management and Resource Recovery Plan (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

The State supports the "good management of solid waste and the conservation of natural resources through the promotion or development of systems to collect, separate, reclaim, recycle, and dispose...

348

ARM - Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

govSite Index govSite Index Expand | Collapse Site Index Videos Image Library About ARM About ARM (home) ARM and the Recovery Act ARM and the Recovery Act (home) ARM Recovery Act Project FAQs Recovery Act Instruments ARM Climate Research Facility Contributions to International Polar Year (IPY) ARM Climate Research Facility Contributions to International Polar Year (IPY) (home) ARM Education and Outreach Efforts Support IPY Research Support for International Polar Year (IPY) ARM Organization ARM Organization (home) Laboratory Partners ARM Safety Policy ARM Science Board ARM Science Board (home) Board Business Become a User Comments and Questions Contacts Contacts (home) ARM Engineering and Operations Contacts Facility Statistics Facility Statistics (home) Historical Field Campaign Statistics

349

ARM - Lesson Plans: Making Clouds  

NLE Websites -- All DOE Office Websites (Extended Search)

the following: 1 liter (or larger) clear glass jar with lid (large mouth jars work best) Ice cubes or crushed ice Hot water Caution: Even very warm water will do. Do not use water...

350

ARM - Lesson Plans: Alphabetical List  

NLE Websites -- All DOE Office Websites (Extended Search)

(PDF, 39KB) Moving Water and Waves (PDF, 340KB) Observing Wind Speed and Cloudiness Ocean Currents Outgassing Past Sea Level Data Plant Growth and Carbon Dioxide Planting...

351

ARM - Lesson Plans: Coastal Erosion  

NLE Websites -- All DOE Office Websites (Extended Search)

of this activity is to study the coastal erosion (or deposition) by waves and sea level rise at a particular area. Materials Each student or group of students will need the...

352

ARM - Lesson Plans: Air Pressure  

NLE Websites -- All DOE Office Websites (Extended Search)

activity to work. It is important that students work carefully and slowly. A break in the seal between the cup and card allows air into the cup, causing the water to fall. Note: If...

353

A management plan for the Douthitt Ranch Sterling County, Texas  

E-Print Network (OSTI)

110 I- Douthitt Ranch Resource Management Calender . . . 115 I- Checklist for Prescribed Burning 119 K- Seed Sources. L- Ranch Maps and Overlays . 121 122 VITA 123 Table 1- Climatic Data for Sterling County, Texas . . . Page 7 Table 2- Major... force behind management decisions. Livestock revenues will be based upon a dollar per hundred weight arrangement. The quality of the Hnished product ( keder calf) will be maintained by controlling the type of calf turned out, the use of growth...

Trail, Justin Neil

2012-06-07T23:59:59.000Z

354

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

355

ARM - VAP Process - sfccldgrid  

NLE Websites -- All DOE Office Websites (Extended Search)

Productssfccldgrid Productssfccldgrid Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Surface Cloud Grid (SFCCLDGRID) Instrument Categories Cloud Properties, Derived Quantities and Models The Surface Cloud Grid VAP uses as input the 15-minute output from the Shortwave Flux Analysis VAP (Long, 2001; Long and Ackerman, 2000; Long et al., 1999) from the Southern Great Plains (SGP) Central and Extended Facilities. It applies a multi-pass weighted sum analytic approximation technique (Caracena, 1987), which uses Gaussian weighting and an imposed scale length, to interpolate to a 0.25 degree by 0.25 degree lat/long grid

356

ARM - VAP Process - pblht  

NLE Websites -- All DOE Office Websites (Extended Search)

Productspblht Productspblht Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Planetary Boundary Layer Height (PBLHT) Instrument Categories Atmospheric Profiling Quicklook plot showing all PBL height estimates produced by the PBLHT VAP for the 05:30 UTC, April 10, 2004, radiosonde at the Southern Great Plains (SGP) site. Quicklook plot showing all PBL height estimates produced by the PBLHT VAP for the 05:30 UTC, April 10, 2004, radiosonde at the Southern Great Plains (SGP) site. Annual summary of PBL height estimates produced by the VAP Liu-Liang method for 2004 at SGP. Annual summary of PBL height estimates produced by the VAP Liu-Liang method

357

ARM - VAP Process - visst  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsvisst Productsvisst Documentation & Plots visst : XDC documentation Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Minnis Cloud Products Using Visst Algorithm (VISST) Instrument Categories Cloud Properties, Satellite Observations General Overview Satellite based retrievals of cloud and radiation properties are available in this value-added product provided by Pat Minnis' group at NASA/Langley using the VISST (Visible Infrared Solar-Infrared Split Window Technique) algorithm. These datastreams are both pixel-level (4-km) retrievals and averages on a 0.3 or 0.5 degree latitude-longitude grid and replace earlier satellite-based retrievals on the Layered Bispectral Threshold Method

358

ARM - VAP Process - tdmadap  

NLE Websites -- All DOE Office Websites (Extended Search)

Productstdmadap Productstdmadap Documentation & Plots tdmadap : XDC documentation Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Aerosol Properties derived from TDMA Measurements (TDMADAP) Instrument Categories Aerosols Output Products tdmaccncoll : Tandem Differential Mobility Analyzer: Cloud Condensation Nuclei -- D. Collins Primary Measurements The following measurements are those considered scientifically relevant. Cloud condensation nuclei Locations Southern Great Plains SGP X1 Browse Data External Data (satellites and others) Contact(s) Alison Tilp (631) 344-4465 tilp@bnl.gov Alison Tilp Developer (631) 344-4465 tilp@bnl.gov Connor Flynn Translator

359

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 8, 2012 [Facility News] October 8, 2012 [Facility News] Near Miss at Barrow Due to Beach Erosion Bookmark and Share With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. On a stormy Friday evening in early September, Walter Brower received an urgent message: "Beach erosion very close to ECOR Point." Brower is the local facility manager for ARM's North Slope of Alaska site in Barrow. His duties extend to Point Barrow at the coastline of the Arctic Ocean, where ARM operates an eddy correlation flux measurement system, or

360

ARM - VAP Process - gvrpwv  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsgvrpwv Productsgvrpwv Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : G-Band Vapor Radiometer Precipitable Water Vapor (GVRPWV) Instrument Categories Radiometric The G-Band Vapor Radiometer Precipitable Water Vapor (GVRPWV) value-added product (VAP) computes precipitable water vapor using neural network techniques from data measured by the GVR. The GVR reports time-series measurements of brightness temperatures for four channels located at 183.3 ± 1, 3, 7, and 14 GHz. For more details, see the technical report. Output Products gvr : G-band (183 GHz) Vapor Radiometer Primary Measurements The following measurements are those considered scientifically relevant.

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ARM - VAP Process - rlprof  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsrlprof Productsrlprof Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Raman LIDAR Vertical Profiles (RLPROF) Instrument Categories Aerosols, Atmospheric Profiling, Derived Quantities and Models Rlprof data flow diagram Rlprof data flow diagram Data flowchart for the RLPROF family. (Larger image available.) The Raman lidar automatically attempts to reoptimize the position of the laser beam in the detector's field-of-view every few hours (this is required for most narrow field-of-view lidar systems). However, this can introduce alignment artifacts in the narrow field-of-view data due to the way the detection channels are arranged on the optical bench. A suite of

362

ARM - VAP Process - aip  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsaip Productsaip Documentation & Plots Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Aerosol Intensive Properties (AIP) Instrument Categories Aerosols The aip1ogren value-added product (VAP) computes several aerosol intensive properties. It requires as input calibrated, corrected, aerosol extensive properties from the Aerosol Observing Station (AOS). Aerosol extensive properties depend on both the nature of the aerosol and the amount of the aerosol. Intensive properties are independent of aerosol amount, depending only on the nature of the specific aerosol. The intensive properties of hygroscopic growth factor, aerosol single-scattering albedo,

363

ARM - VAP Process - diffcor  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsdiffcor Productsdiffcor Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Correction of Diffuse Shortwave Measurements (DIFFCOR) Instrument Categories Derived Quantities and Models The DIFFCORR1DUTT VAP uses two techniques to correct shortwave (SW) data during daytime hours, using information from a collocated pyrgeometer. First, the detector-only correction technique uses data in the form of irradiance loss from the pyrgeometer detector. Second, the full-correction technique uses information from collocated pyrgeometer detector data, plus the difference between the case and dome temperatures. Both techniques

364

ARM - Data Quality Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Quality Program Quality Program DQ Resources Data Quality Assessment and Control Report (PDF, 747KB) Data Quality Office Data Quality Problem Reporting (DQPR) Contact Us Submit Data Quality Findings Randy Peppler, Data Quality Manager Ken Kehoe, Data Quality Specialist Justin Monroe, Data Quality Specialist Adam Theisen, Data Quality Specialist Sean Moore, Data Quality Consultant Instrument and Site Contacts Instrument Mentors AAF Contacts AMF Contacts NSA Site Contacts SGP Site Contacts TWP Site Contacts Data Quality Program Introduction One of the goals of the ARM Climate Research Facility is to provide datastreams of quality suitable for scientific research. Maintaining data quality for an organization program of the size and complexity of the ARM Facility is a significant challenge; efforts toward this end have matured

365

ARM - VAP Process - aosccnavg  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsaosccnavg Productsaosccnavg Documentation & Plots Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Aerosol Observing System (AOS): cloud condensation nuclei data, averaged (AOSCCNAVG) Instrument Categories Aerosols This value-added product was developed to consolidate the relevant cloud condensation nuclei (CCN) parameters into a single file and averaged the data over the 5-minute integration time of each percent supersaturation (%ss) value. The surface sites measure the CCN concentration at several supersaturations using a single-column CCN counter (Roberts and Nenes, 2005). The percent supersaturation of the instrument is stepped through

366

ARM - VAP Process - interpsonde  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsinterpsonde Productsinterpsonde Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Interpolated Sonde (INTERPSONDE) Instrument Categories Atmospheric Profiling, Derived Quantities and Models The INTERPSONDE value-added product (VAP) is a modification of the MERGESONDE VAP that produces a daily file of thermodynamic variables from radiosonde soundings, the microwave radiometer, and surface meteorological instruments. This product does not incorporate ECMWF model output. INTERPSONDE includes many of the same sophisticated scaling/interpolation/smoothing schemes that are the hallmark of MERGESONDE, but there are benefits to excluding ECMWF model output. These

367

ARM - VAP Process - mplnor  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsmplnor Productsmplnor Documentation & Plots Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Normalized Backscatter Profiles from the Micropulse Lidar (MPLNOR) Instrument Categories Cloud Properties This VAP has two primary purposes: to apply the appropriate corrections to create normalized backscatter profiles from the MPL, and to detect all significant cloud boundaries from this normalized dataset. The corrections included in the normalization process include background subtraction, a correction for the afterpulsing (ringing) of the detector, an correction for the disparity between the laser and detector's field-of-view (overlap),

368

ARM - VAP Process - surfspecalb  

NLE Websites -- All DOE Office Websites (Extended Search)

Productssurfspecalb Productssurfspecalb Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Surface Spectral Albedo (SURFSPECALB) Instrument Categories Surface/Subsurface Properties Example quicklook from the SURFSPECALB VAP. The plot shows the estimated spectral albedo at SGP for the 10-m and 25-m towers on September 11, 2004. On this day, the surface type for both towers is partial vegetation. Example quicklook from the SURFSPECALB VAP. The plot shows the estimated spectral albedo at SGP for the 10-m and 25-m towers on September 11, 2004. On this day, the surface type for both towers is partial vegetation.

369

ARM - VAP Product - aosccnavg  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsaosccnavgaosccnavg Productsaosccnavgaosccnavg Documentation Data Management Facility Plots (Quick Looks) Citation DOI: 10.5439/1095312 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP Output : AOSCCNAVG Aerosol Observing System (AOS): cloud condensation nuclei data, averaged Active Dates 2007.05.19 - 2014.01.05 Originating VAP Process Aerosol Observing System (AOS): cloud condensation nuclei data, averaged : AOSCCNAVG Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Cloud condensation nuclei Number concentration of CCN 1/cm^3 N_CCN ( time ) Size distribution of activated nuclei unitless N_CCN_dN ( time, droplet_size )

370

ARM - VAP Process - abrfc  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsabrfc Productsabrfc Documentation & Plots abrfc : XDC documentation Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Arkansas-Red Basin River Forecast Center (ABRFC) Instrument Categories Surface Meteorology General Overview Every hour a gridded (4 km x 4 km) precipitation field is created. This field is a combination of both WSR-88D Nexrad radar precipitation estimates and rain gauge reports. The ABRFC performs extensive quality control on these data. For more details, see the External Data Center web page. Output Products abrfcprecip : Arkansas-Red Basin River Forecast Center: estimated precipitation Primary Measurements The following measurements are those considered scientifically relevant.

371

ARM - VAP Process - twrmr  

NLE Websites -- All DOE Office Websites (Extended Search)

Productstwrmr Productstwrmr Documentation & Plots Technical Report Data Management Facility Plots (Quick Looks) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP : Tower Water-Vapor Mixing Ratio (TWRMR) Instrument Categories Atmospheric Profiling The primary purpose of this algorithm is to calculate water-vapor mixing ratio at the 25- and 60-m levels of the tower at the Southern Great Plains (SGP) Central Facility. Since there are no barometric pressure sensors at those levels on the tower, the hypsometric equation is used along with pressure values from either the Surface Meteorological Observation System (SMOS) or the Temperature, Humidity, Wind, and Pressure System (THWAPS) to derive barometric pressures at those altitudes. After this is done, water

372

RCRA Assessment Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site  

SciTech Connect

This document describes a groundwater assessment plan for the single-shell tank systems in Waste Management Area A-AX at the Hanford Site.

Narbutovskih, Susan M.; Chou, Charissa J.

2006-03-03T23:59:59.000Z

373

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan  

SciTech Connect

This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.

G. L. Schwendiman

2006-07-01T23:59:59.000Z

374

Program Planning & Management Forms (5000-5999) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Planning & Management Forms (5000-5999) Program Planning & Management Forms (5000-5999) Program Planning & Management Forms (5000-5999) DOE F 5160.1 (pdf) Reprogramming, Restructuring, and Appropriation Transfer Summary DOE F 5480.4 (pdf) Contractor Employee Occupational Safety or Health Complaint DOE F 5484.3 (pdf) Individual Accident/Incident Report DOE F 5484.4 (pdf) Tabulation of Work-Hours and Vehicle Usage, and Property Valuation DOE F 5500.2 (pdf) Operational Incident Report DOE F 5631.18 (pdf) Security Acknowledgement DOE F 5631.20 (fillable pdf) Request for Visit or Access Approval DOE F 5631.29 (pdf) Security Termination Statement DOE F 5631.34 (pdf) Data Report on Spouse/Cohabitant DOE F 5634.1 (pdf) Safeguards and Security Survey Report DOE F 5635.9 (pdf) Record of Destruction

375

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2  

SciTech Connect

The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

Gerber, E.W.

1995-10-01T23:59:59.000Z

376

ARM - Feature Stories and Releases Article  

NLE Websites -- All DOE Office Websites (Extended Search)

data obtained at the ARM site in Darwin. Planning for the campaign was a three-year process involving scientific organizations from around the world, resulting in as a highly...

377

Characterization Program Management Plan for Hanford K Basin Spent Nuclear Fuel (SNF) (OCRWM)  

SciTech Connect

The management plan developed to characterize the K Basin spent nuclear fuel (SNF) and sludge was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the SNF stored at the Hanford K Basins. The plan also addressed necessary characterization for the removal, transport, and storage of the sludge from the Hanford K Basins. This plan was revised in 1999 (i.e., Revision 2) to incorporate actions necessary to respond to the deficiencies revealed as the result of Quality Assurance surveillances and audits in 1999 with respect to the fuel characterization activities. Revision 3 to this Program Management Plan responds to a Worker Assessment resolution determined in Fical Year 2000. This revision includes an update to current organizational structures and other revisions needed to keep this management plan consistent with the current project scope. The plan continues to address both the SNF and the sludge accumulated at K Basins. Most activities for the characterization of the SNF have been completed. Data validation, Office of Civilian Radioactive Waste Management (OCRWM) document reviews, and OCRWM data qualification are the remaining SNF characterization activities. The transport and storage of K Basin sludge are affected by recent path forward revisions. These revisions require additional laboratory analyses of the sludge to complete the acquisition of required supporting engineering data. Hence, this revision of the management plan provides the overall work control for these remaining SNF and sludge characterization activities given the current organizational structure of the SNF Project.

BAKER, R.B.; TRIMBLE, D.J.

2000-12-12T23:59:59.000Z

378

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

379

A plan for teaching waste management education at an outdoor education center  

E-Print Network (OSTI)

A PLAN FOR TEACHING WASTE MANAGEMENT EDUCATION AT AN OUTDOOR EDUCATION CENTER A PROFESSIONAL PAPER BY JOE DON ARMSTRONG Submitted to the College of Agriculture and Life Sciences of Texas A&M University in partial fulfillment... by JOE DON ARMSTRONG Approved as to style and content by: DR, LOUIS H DGES (CHAIRMAN OF ADVISORY COMMITTEE) DR. EDWARD HEATH (COMMITTEE MEMBER) DR. CAMILL G (COMMITTEE MBER) DR. R WITT (DEPARTMENT HEAD) MAY 1994 1 1. l. ABSTRACT A Plan...

Armstrong, Joe Don

1994-01-01T23:59:59.000Z

380

EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam  

Energy.gov (U.S. Department of Energy (DOE))

Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency.

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GHG and Carbon Emissions Management Strategic Planning Tooƒ  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Strategic Planning Tools - Localized Strategic Planning For The U.S. Department of Energy National Energy Technology Laboratory Under Contract Number: DE-AM-26-99FT40465 Task 50113, Subtask 3 Augusta Systems Report Number: AS-NETL-50113-3-FR December 31, 2002 DISCLAIMER AND ACKNOWLEDGEMENTS Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

382

Uranium mill tailings remedial action project real estate management plan  

SciTech Connect

This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

Not Available

1994-09-01T23:59:59.000Z

383

Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site  

SciTech Connect

The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

Hutchison, J.; Jernigan, G.

1989-12-01T23:59:59.000Z

384

arm09  

NLE Websites -- All DOE Office Websites (Extended Search)

dry are the Subtropics? or: dry are the Subtropics? or: How did the ARM MP183 end up in the Southeast Pacific? Paquita Zuidema U of Miami Maria Cadeddu Argonne NL (Chile) Arica ERBE net cloud forc. !"#$$$%&'$()!(*!(+!(,!(- $ $ ./01 2 3 4(" -(" ,(" 5*6 2*6 )*6 *6 ( 5( +( 4( )2( )*( 20S Oct mean LWP 85W 0 50 100 150 LWP (g m -2 ) a) 0 50 100 150 LWP (Lieb87,G57; g m -2 ) -30 -20 -10 0 10 LWP diff. (g m -2 ) b) EPIC (2001) 6 research cruises < 2008 more modern gaseous absorption models (Rosenkranz 1998, Liljegren 2005) produce lower LWPs than Liebe 1987 Zuidema et al. 2005 (Prosensing)183 GHz GVR 2-channel MWR (Peter Minnett) ARM Radiometrics 183 NOAA 90 GHz 0 50 100 150 200 Frequency (GHz) 50 100 150 200 250 300 T b (K) 2.33 (90%) 1.30 (10%) wvp (mm) clear-sky spectra of 10th and 90th percentile VOCALS-REx domain soundings

385

A Sandia nuclear weapon knowledge management program plan for FY 1998--2003. Volume 1: Synopsis  

SciTech Connect

This volume contains a synopsis and briefing charts for a five-year plan which describes a Knowledge Management Program needed to meet Sandia`s responsibility for maintaining safety, security, reliability, and operational effectiveness of the nuclear weapon stockpile. Although the knowledge and expertise required to maintain and upgrade the stockpile continues to be critical to the country`s defense, Sandia`s historical process for developing and advancing future knowledge and expertise needs to be addressed. This plan recommends implementing an aggressive Knowledge Management Program to assure retention and furtherance of Sandia`s expertise, beginning in fiscal year 1998, as an integrated approach to solving the expertise dilemma.

NONE

1998-02-01T23:59:59.000Z

386

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

McCormack, R.L.

1995-08-01T23:59:59.000Z

387

Security plan for the Automated Transportation Management System  

SciTech Connect

The Automated Transportation Management System (ATMS) is an unclassified non-sensitive system consisting of hardware and software designed to facilitate the shipment of goods for the US Department of Energy (DOE). The system is secured against waste, fraud, abuse, misuse, and programming errors through a series of security measures that are discussed in detail in this document.

Not Available

1994-04-01T23:59:59.000Z

388

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiosonde Data Distribution In Place for Modeling During M-PACE Radiosonde Data Distribution In Place for Modeling During M-PACE Bookmark and Share An M-PACE researcher launches a radiosonde at Oliktok Point. Several launch periods, spanning at least 5 days each with 4 launches per day, are planned for all four experimental sites (Barrow, Oliktok Point, Atqasuk and Toolik Lake). An M-PACE researcher launches a radiosonde at Oliktok Point. Several launch periods, spanning at least 5 days each with 4 launches per day, are planned for all four experimental sites (Barrow, Oliktok Point, Atqasuk and Toolik Lake). During the Mixed-Phase Arctic Cloud Experiment (M-PACE), taking place in October 2004 at the ARM Climate Research Facility North Slope of Alaska (NSA) locale, radiosonde systems are being deployed at Atqasuk, Toolik

389

North Slope Decision Support for Water Resource Planning and Management  

SciTech Connect

The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaskas North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaskas North Slope.

Schnabel, William; Brumbelow, Kelly

2013-03-31T23:59:59.000Z

390

Quality assurance management plan (QAPP) special analytical support (SAS)  

SciTech Connect

It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

LOCKREM, L.L.

1999-05-20T23:59:59.000Z

391

ARM - Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2007 [Facility News] January 11, 2007 [Facility News] ARM Mobile Facility Moves to China in 2008 for Study of Aerosol Impacts on Climate Bookmark and Share Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) China generates exceptionally high amounts of aerosol particles whose influence on the atmosphere has been detected across the Pacific Rim. In the Yangtze River delta in southeast China, these high aerosol loadings

392

ARM News  

NLE Websites -- All DOE Office Websites (Extended Search)

AMF2 Arrives in Finland Thu, 02 Jan AMF2 Arrives in Finland Thu, 02 Jan 2014 15:20:50 +0000 Publication Notice: 13 New References Available Tue, 31 Dec 2013 22:58:51 +0000 New Brochure Highlights Advances in Atmospheric Science Tue, 31 Dec 2013 09:35:40 +0000 Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere Mon, 30 Dec 2013 00:01:43 +0000 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species Fri, 13 Dec 2013 23:04:03 +0000 Publication Notice: New Journal Reference Available Wed, 11 Dec 2013 21:12:19 +0000 All Mixed Up—Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds Mon, 09 Dec 2013 15:38:33 +0000 ARM Facility Insights at the 2013 AGU Fall Meeting Fri, 06 Dec 2013 15:12:38

393

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2  

SciTech Connect

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

Not Available

1994-09-01T23:59:59.000Z

394

ARM - ARM Mobile Facility 1 Article  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterARM Mobile Facility 1ARM Mobile Facility 1 Article CenterARM Mobile Facility 1ARM Mobile Facility 1 Article Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance January 13, 2011 [ARM Mobile Facility 1, Blog, Field Notes] AMF1 Azores Pack-up: Rust, Corrosion, and Wet Instruments Bookmark and Share PSP shows the harsh beating it took from the Atlantic mists.

395

ARM - 2014 AMS Presentations Featuring ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

4 AMS Presentations Featuring ARM Data Media Contact Rolanda Jundt rolanda-dot-jundt-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes99 AGU 3 AMIE 10 ARM Aerial...

396

ARM - 2000 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

0 ARM Science Team Meeting 0 ARM Science Team Meeting 2000 Meeting 2000 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2000 ARM Science Team Meeting March 13 - 17 | San Antonio, Texas | St. Anthony Hotel & The Municipal Auditorium St. Anthony Hotel provided rooms along with the Municipal Auditorium for the 2000 ARM Science Team Meeting. St. Anthony Hotel provided rooms along with the Municipal Auditorium for the 2000 ARM Science Team Meeting. The tenth ARM Science Team Meeting was held in San Antonio, Texas. The Science Team Meetings were intended to provide opportunities to share scientific findings, focused technical exchanges, and collectively examine the implementation and operation of ARM.

397

ARM TR-008  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 ACRF Ingest Software Status: New, Current, and Future February 2007 Annette Koontz, for ACRF Engineering Management Pacific Northwest National Laboratory PNNL Ingest Developers: Sutanay Choudhury Brian Ermold Krista Gaustad Annette Koontz Work supported by the U. S. Department of Energy, Office of Science, Office of Biological and Environmental Research February 2007, DOE/SC-ARM/P-07-004.1 Introduction The purpose of this report is to provide status of the ingest software used to process instrument data for the Atmospheric Radiation Measurement Program Climate Research Facility (ACRF). The report is divided into 4 sections: (1) for news about ingests currently under development, (2) for current production

398

GHG and Carbon Emissions Management Strategic Planning Tooƒ  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Planning Tools For The U.S. Department of Energy National Energy Technology Laboratory Under Contract Number: DE-AM-26-99FT40465 Task 50113, Subtask 3 Augusta Systems Report Number: AS-NETL-50113-3-FR December 31, 2002 DISCLAIMER AND ACKNOWLEDGEMENTS Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

399

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

Gerber, E.W.

1996-09-23T23:59:59.000Z

400

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network (OSTI)

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Tourism Recreation Group Leadership 3 RPTM 26060 Introduction to Global Tourism 3 Offered in fall only HM 13024 Fulfills domestic diversity requirement; offered in fall only RPTM 36060 Commercial Recreation and Tourism

Sheridan, Scott

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Assessment/Regulatory Impact Review AMENDMENT 45 TO THE FISHERY MANAGEMENT PLAN  

E-Print Network (OSTI)

Environmental Assessment/Regulatory Impact Review FOR AMENDMENT 45 TO THE FISHERY MANAGEMENT PLAN FOR GROUNDFISH OF THE GULF OF ALASKA AND THE ASSOCIATED REGULATORY AMENDMENT TO COMBINE THE THIRD AND FOURTH QUARTERLY POLLOCK ALLOWANCES IN THE WESTERN AND CENTRAL REGULATORY AREAS OF THE GULF OF ALASKA Prepared

402

MTRG/Ascension Management Plan 2002 SECTION 6: DEVELOPMENT OF INFRASTRUCTURE FOR ECOTOURISM  

E-Print Network (OSTI)

MTRG/Ascension Management Plan 2002 25 SECTION 6: DEVELOPMENT OF INFRASTRUCTURE FOR ECOTOURISM was to establish and leave in place an infrastructure for ecotourism. The definition we would use would be that ecotourism related to sea turtles in this case should be sustainable, low impact turtle watching which

Exeter, University of

403

Recommended Academic Plan for Landscape Contracting Major -Management Option University Park  

E-Print Network (OSTI)

Recommended Academic Plan for Landscape Contracting Major - Management Option University Park Applications for Landscape Contracting 2 B LAW 243 Legal Environment of Business 3 SOILS 101 (GN) Introductory Landscape Plant Establishment and Maintenance 4 HORT 250 Landscape Contracting Design/Build Principles 3

Guiltinan, Mark

404

AN INTEGRATED PLANNING-SIMULATION-ARCHITECTURE APPROACH FOR LOGISTICS SHARING MANAGEMENT  

E-Print Network (OSTI)

AN INTEGRATED PLANNING-SIMULATION-ARCHITECTURE APPROACH FOR LOGISTICS SHARING MANAGEMENT: A CASE In logistics, freight transportation is a major source of income in a country's economy. One of the most popular strategies is logistics sharing, which is a complex problem due to the involved stakeholders

Paris-Sud XI, Université de

405

Preparation of a Data Management Plan, Development of the Data Pipeline, and Efficient Archiving  

E-Print Network (OSTI)

Preparation of a Data Management Plan, Development of the Data Pipeline, and Efficient Archiving quality data archive is produced, design archive production into the instrument data pipeline, use PDS major archive design milestones, early generation of sample data, peer review of the pipeline

Waliser, Duane E.

406

Post-seismic supply chain risk management: A system dynamics disruption analysis approach for inventory and logistics planning  

Science Journals Connector (OSTI)

Post-seismic inventory and logistics planning under incomplete and fuzzy information is an important yet understudied area in supply chain risk management. The goal of this paper is to propose a system dynamics model to analyze the behaviors of disrupted ... Keywords: Forecasting method, Inventory and logistics planning, Post-seismic supply chain, Risk management, System dynamics

Min Peng; Yi Peng; Hong Chen

2014-02-01T23:59:59.000Z

407

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

NSTec Environmental Management

2008-09-01T23:59:59.000Z

408

Western Area Power Administration Record of Decision for the Energy Planning and Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices at 941 North Capitol Street, NE., Washington, DC 20426. Lois D. Cashell, Secretary. [FR Doc. 95-25230 Filed 10-11-95; 8:45 am] BILLING CODE 6717-01-M Western Area Power Administration Record of Decision for the Energy Planning and Management Program AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Department of Energy, Western Area Power Administration (Western) completed a draft and final environmental impact statement (EIS), DOE/EIS-0182, on its Energy Planning and Management Program (Program). Western is publishing this Record of Decision (ROD) to adopt the Program, which will require the preparation of integrated resource plans (IRP) by Western's long-term firm power

409

Configuration Management Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Management Configuration Management Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders. Criteria: The CM program supports DOE program implementation through the following: It provides the mechanisms for identifying, cataloging, and maintaining the design requirements and design basis (established to satisfy DOE O 420.1 Facility Safety).

410

ARM Orientation Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Finding " Finding " " Stuff Stuff " " from from ARM Web Site and Data ARM Web Site and Data Archive Archive Orientation for new Science Team Members Topics Topics Navigating ARM web site Navigating ARM web site - - finding ARM information finding ARM information Demo of Archive access Demo of Archive access - - Finding and requesting ARM data files Finding and requesting ARM data files - - (with web shopping cart interface) (with web shopping cart interface) Other Archive access options Other Archive access options - - Brief logical comparison Brief logical comparison - - (additional details as requested) (additional details as requested) Other documentation topics Other documentation topics - - (per user interest and time availability) (per user interest and time availability)

411

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

20, 2008 Facility News ARM Scientists Lead International Radiation Symposium in Brazil Bookmark and Share The ARM Science Team showed up in force at the 2008 International...

412

AMF ARM Mobile FAcility  

NLE Websites -- All DOE Office Websites (Extended Search)

AMF ARM Mobile FAcility Details on the AMF proposal process can be found at http:www.arm.govacrfsubmitproposals.stm. For more information, contact: Mark Miller Mary Jane...

413

ARM - Education Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 19, 2002 Education ARM Education Takes Part in International Digital Library Bookmark and Share The ARM Education team has recently completed writing a proposal to the...

414

94-A13 Native American Initiative Short Course Management Plan  

SciTech Connect

A training program conducted in Bartlesville by BDM-Oklahoma technical staff, which included geologists, geophysicists, exploration and drilling specialists, and environmental policy experts. The proposed training schedule offered four courses per year and included those coursed identified by the tribes in the survey. The training program was outlined for members of Native American Tribes whose lands have oil and gas resources. The proposed program contributed to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined was for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the Spring of 1995 to 26 tribal agencies identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes, were the Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapho, and Ute Mountain Ute.

Carroll, Herbert B.; Johnson, William I.; Kokesh, Judith H.

1999-04-27T23:59:59.000Z

415

Native Grass Community Management Plan for the Oak Ridge Reservation  

SciTech Connect

Land managers at the Department of Energy's Oak Ridge National Laboratory in East Tennessee are restoring native warm-season grasses and wildflowers to various sites across the Oak Ridge Reservation (ORR). Some of the numerous benefits to planting native grasses and forbs include improved habitat quality for wildlife, improved aesthetic values, lower long-term maintenance costs, and compliance with Executive Order 13112 (Clinton 1999). Challenges to restoring native plants on the ORR include the need to gain experience in establishing and maintaining these communities and the potentially greater up-front costs of getting native grasses established. The goals of the native grass program are generally outlined on a fiscal-year basis. An overview of some of the issues associated with the successful and cost-effective establishment and maintenance of native grass and wildflower stands on the ORR is presented in this report.

Ryon, Michael G [ORNL; Parr, Patricia Dreyer [ORNL; Cohen, Kari [ORNL

2007-06-01T23:59:59.000Z

416

Data management plan for the Oak Ridge Environmental Information System, Version 1. 1  

SciTech Connect

The Data Management Plan (DMP) describes the data management objectives, system components, data base structure and contents, system maintenance, data processing, and user interface for the prototype phase of the Oak Ridge Environmental Information System (OREIS). The major goals of OREIS data management are to compile data of known quality, to maintain the integrity of the data base, and to provide data to users. The DMP defines the requirements, describes the responsibilities, and references the procedures for meeting the data management objectives. Emphasis is on management of measurement data and the associated metadata used to support its proper interpretation and legal defensibility. The DMP covers transmittal, processing, storage, and data access activities associated with OREIS. The OREIS data dictionary is provided as an appendix.

Not Available

1992-08-04T23:59:59.000Z

417

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Website Integration Effort Delivers One-Stop Shopping for Data Bookmark and Share The ARM website was upgraded with a new capability in September. ARM data users now have the ability to order data using the data cart from www.arm.gov. The ARM website was upgraded with a new capability in September. ARM data users now have the ability to order data using the data cart from www.arm.gov. On September 27, a new way to browse and order ARM data became available on the ARM website after nine months of development. ARM infrastructure staff from three national laboratories-Brookhaven National Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory-teamed together to integrate the ARM web pages with the ARM

418

Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect

Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

Cooper, W.E.

2000-09-29T23:59:59.000Z

419

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1  

SciTech Connect

The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

Gerber, E.W.

1995-10-01T23:59:59.000Z

420

ARM - ARM Facility at EGU 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterARM Facility at EGU 2012 CenterARM Facility at EGU 2012 Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance ARM Facility at EGU 2012 At the 2012 European Geophysical Union General Assembly in Vienna, the ARM Climate Research Facility is hosting a booth located near the escalators in the Exhibition Entrance Hall. In their first time attending the assembly,

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.  

SciTech Connect

This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.

Childs, Allen B.

2002-02-01T23:59:59.000Z

422

Underground test area subproject waste management plan. Revision No. 1  

SciTech Connect

The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS.

NONE

1996-08-01T23:59:59.000Z

423

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan  

SciTech Connect

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

Macaluso, C. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Offner, J.; Patric, J. [Booz Allen Hamilton, Washington, DC (United States)

2008-07-01T23:59:59.000Z

424

Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan  

SciTech Connect

This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

RIECK, C.A.

1999-02-23T23:59:59.000Z

425

DNFSB recommendation 94-1 Hanford site integrated stabilization management plan  

SciTech Connect

In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document is the fifth update of the Hanford SISMP.

McCormack, R.L.

1997-05-07T23:59:59.000Z

426

Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites  

SciTech Connect

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

None

2012-10-24T23:59:59.000Z

427

Proceedings of the Second International Symposium on Fire Economics, Planning, and Policy: A Global View Fire Management Plan at Regional Scale in  

E-Print Network (OSTI)

protection (L.353/2000) is presented. In particular the main features of the recent regional fire management of the fire management plan are reported, together with the criteria followed to define the protection at regional scale are based on the wildland fire protection national law L. 353/2000. This regulation

Standiford, Richard B.

428

Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect

This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

NONE

1996-04-01T23:59:59.000Z

429

The Department of Energy's Office of Environmental Management's Budget Allocation Plan, OAS-L-12-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy's Office The Department of Energy's Office of Environmental Management's Budget Allocation Plan OAS-L-12-03 March 2012 Department of Energy Washington, DC 20585 March 15, 2012 MEMORANDUM FOR THE SENIOR ADVISOR FOR ENVIRONMENTAL MANAGEMENT FROM: Daniel M. Weeber, Director Eastern Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Office of Environmental Management's Budget Allocation Plan" BACKGROUND The Department of Energy's Office of Environmental Management is tasked with managing the technically challenging risks posed by the world's largest nuclear cleanup effort. At the end of Fiscal Year 2010, EM had responsibility for nuclear cleanup activities at 18 sites covering more

430

ARM - Publications Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 27, 2013 [Publications] September 27, 2013 [Publications] New Radar Brochure Available Bookmark and Share A new brochure describing ARM's global network of 32 research radars is now available. ARM radars are divided into three main groups: Scanning ARM Cloud Radars; Scanning ARM Precipitation Radars; and ARM Cloud Profiling Radars. A map is included, showing where specific radars are located throughout the ARM sites: North Slope of Alaska, Southern Great Plains, Tropical Western Pacific, and Eastern North Atlantic. It also indicates which type of radars are available with each of ARM's three mobile facilities. In addition, the brochure includes a high-level flowchart detailing how ARM radar data is stored, processed, and output into advanced data products and tools. All ARM data can be found using the ARM Data

431

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W.E.

2000-09-29T23:59:59.000Z

432

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)  

SciTech Connect

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W E

2000-12-05T23:59:59.000Z

433

A modeling approach to evaluate the impacts of water quality management plans implemented in a watershed in Texas  

E-Print Network (OSTI)

best management practices (BMPs) have been implemented through Water Quality Management Plans (WQMPs; Best management practices Software availability Name of the software: Soil and Water Assessment Tool. doi:10.1016/j.envsoft.2005.05.013 www.elsevier.com/locate/envsoft Environmental Modelling & Software

434

Before the Subcommittee on Strategic Forces - House Armed Services...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Written Statement by David Huizenga, Senior Advisor for Environmental Management For the Subcommittee on Strategic Forces - House Armed Services Committee 5-9-13David Huizenga FT...

435

NNSA Completes its Critical Radar Arming and Fuzing Test for...  

National Nuclear Security Administration (NNSA)

its Critical Radar Arming and Fuzing Test for the W88 ALT 370 | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering the...

436

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2004 [Facility News] May 15, 2004 [Facility News] Mid-latitude Cirrus Cloud Experiment Underway Bookmark and Share NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. In late April, scientific collaborators at the National Aeronautics and Space Administration (NASA) carried out two high-altitude flights over the ARM Climate Research Facility Southern Great Plains (SGP) central facility. The purpose of these flights was to use a new suite of cloud property probes on the WB-57F aircraft to more accurately characterize the properties of mid-latitude cirrus clouds-which are composed solely of ice crystals-than has previously been possible. Eight flights over the SGP central facility were originally planned, but the expected cirrus clouds

437

Strategic planning for disaster relief logistics: lessons from supply chain management  

Science Journals Connector (OSTI)

Management of disaster relief logistics requires different techniques at different levels. We identify four stages: 1 strategic planning which concerns high level decisions such as supplier selection and confirmation of communication protocols; 2 preparedness which concerns decisions regarding the amount and location of relief supplies to be stored; 3 pre-event response which concerns decisions during those occasions when an approaching disaster, such as a hurricane, has been detected; 4 post-event response which concerns what needs to be done immediately after a disaster has occurred. In this article, we concentrate on the strategic planning stage and build an integrated logistics model based on elements of supply chain management theory. This model provides specific recommendations to practitioners and identifies important areas to be researched. We also point out the applicable techniques at each of the other stages and cite relevant literature.

Nezih Altay; Sameer Prasad; Jayavel Sounderpandian

2009-01-01T23:59:59.000Z

438

300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energys (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

Freshley, Mark D.

2008-12-31T23:59:59.000Z

439

ARM - 2012 AMS Presentations Featuring ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

2 AMS Presentations Featuring ARM Data 2 AMS Presentations Featuring ARM Data Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance 2012 AMS Presentations Featuring ARM Data Monday, January 23 Presentation Type Session ID and Presentation Title Presenters Time and Location Oral Invited J2.1, Next-Generation Global Precipitation Data for Hydrometeorogical Applications Arthur Y. Hou, Dalia Bach Kirschbaum 11:00 AM, 256

440

ARM - 1997 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

7 ARM Science Team Meeting 7 ARM Science Team Meeting 1997 Meeting 1997 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1997 ARM Science Team Meeting March 3 -7 | San Antonio, Texas | St. Anthony Hotel & Municipal Auditorium The St. Anthony Hotel as well as the Municipal Auditorium and Conference Center provided rooms and meeting space. The St. Anthony Hotel as well as the Municipal Auditorium and Conference Center provided rooms and meeting space. The seventh ARM Science Team Meeting was held in San Antonio, Texas. This year the ARM Science Team Meeting and the Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) science team meetings were held jointly. The Science Team Meetings were intended to provide opportunities

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ARM - 2006 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Meeting 2006 Meeting 2006 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Posters Presentations Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 2006 ARM Science Team Meeting March 27-18 | Albuquerque, New Mexico | Hyatt Regency Albuquerque The Hyatt Regency - Albequerque The Hyatt Regency - Albequerque Meeting Highlights Just over 300 ARM scientists and ACRF infrastructure staff took part in the 16th ARM Science Team meeting held in Albuquerque, New Mexico, on March 27-31, 2006. After an initial day of focused meetings among the ARM Working Groups, Dr. David Thomassen, Acting Associate Director of DOE's Office of Biological and Environmental Research (BER), opened the meeting's plenary session with remarks about the role of ARM within the DOE, and its

442

ARM - 2013 AMS Presentations Featuring ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

3 AMS Presentations Featuring ARM Data 3 AMS Presentations Featuring ARM Data Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance 2013 AMS Presentations Featuring ARM Data Sunday, January 6 Presentation Type Session ID and Presentation Title Presenters Time and Location Poster Sessions Poster S150 Analysis of SPartiCus Data for Cirrus Modeling Case Studies R. L. Atlas, A. M. Fridlind and M. Diao 2:30-4:00 PM, Exhibit Hall 3

443

ARM - AGU Presentations Featuring ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

CenterAGU Presentations Featuring ARM Data CenterAGU Presentations Featuring ARM Data Media Contact Lynne Roeder lynne-dot-roeder-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes89 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 BAECC 1 BBOP 4 MAGIC 12 MC3E 17 SGP 2 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes Blog feed Events feed Employment Research Highlights Data Announcements Education News Archive What's this? Social Media Guidance AGU Presentations Featuring ARM Data Monday, December 13 Presentation Type Session ID and Presentation Title Presenters Time and Location A11H. Atmospheric Sciences General Contributions: Clouds and Aerosol-Cloud Interactions I

444

A planning-oriented sustainability assessment framework for peri-urban water management in developing countries  

Science Journals Connector (OSTI)

Abstract DPSIR and the three-pillar model are well-established frameworks for sustainability assessment. This paper proposes a planning-oriented sustainability assessment framework (POSAF). It is informed by those frameworks but differs insofar as it puts more emphasis on a constructivist conception which recognises that sustainability needs to be defined anew for each planning problem. In finding such a consensus definition, POSAF uses participatory scenario analysis and participatory planning, technical feasibility study, participatory assessment, analysis of trade-offs and social networks in an unusual combination and for goals that differ from the original conceptions of these methods. POSAF was applied in a peri-urban area of Mexico City for the design of improved water service provision, integrating solid waste management. It supported consensus amongst users about the importance of environmental issues, informed planners about the values of stakeholders and users, detected local differences, and identified possible conflicts at an early stage of decision-making.

Markus Starkl; Norbert Brunner; Eduardo Lpez; Jos Luis Martnez-Ruiz

2013-01-01T23:59:59.000Z

445

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM External Data: Recent Developments and Future Plans ARM External Data: Recent Developments and Future Plans Wagener, R., Gregory, L., Ma, L.L., and Cialella, A., Brookhaven National Laboratory Twelfth Atmospheric Radiation Measurement (ARM) Science Team Meeting This poster lists new datastreams collected and processed by the ARM External Data Center since the last update in 1999 (MOLTS, TOMS, 30 min OK Mesonet, CSPHOT, TWP AVHRR, ECMWF, RUC, TAO Buoy, IAP). We describe briefly the software tools employed in converting these data to netCDF files, because data-users might find them helpful in dealing with the raw files themselves (GrADS, IDL, Perl). The priorities for future data acquisitions and ingests are set by consensus of the Science Working Groups. The current high priority new collections include: Suominet GPS data, Darwin Radar and

446

Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project  

SciTech Connect

This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

SINCLAIR, J.C.

1999-05-03T23:59:59.000Z

447

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan  

SciTech Connect

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

Fix, N. J.

2008-02-20T23:59:59.000Z

448

Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement  

SciTech Connect

In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

Not Available

1994-01-01T23:59:59.000Z

449

Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000  

SciTech Connect

This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

DOE /NV

2000-04-01T23:59:59.000Z

450

Integration of hydrogen management in refinery planning with rigorous process models and product quality specifications  

Science Journals Connector (OSTI)

New trends of increased heavy crude markets and clean-fuel legislation, to produce ultra low-sulphur (ULS) gasoline and diesel fuels, are forcing refineries to increase their consumption of hydrogen. This critical situation raises the need to have a tool for operating refineries with flexibility and profitability. This paper addresses the planning of refinery with consideration to hydrogen availability. A systematic method for integrating a hydrogen management strategy within a rigorous refinery planning model is undertaken. The presented model consists of two main building blocks: a set of non-linear processing units' models and a hydrogen balance framework. The two blocks are integrated to produce a refinery-wide planning model with hydrogen management. The hydrogen management alternatives were determined by economic analysis. The proposed model improves the hidden hydrogen unavailability that prevents refineries from achieving their maximum production and profit. The model is illustrated on representative case studies and the results are discussed. It was found that an additional annual profit equivalent to $7 million could be achieved with a one-time investment of $13 million in a new purification unit.

Ali Elkamel; Ibrahim Alhajri; A. Almansoori; Yousef Saif

2011-01-01T23:59:59.000Z

451

ARM - 1993 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Past Science Team Meetings 1993 ARM Science Team Meeting March 1 - 4 | Norman, Oklahoma | Norman, Oklahoma, is the home of the National Weather Service. Norman, Oklahoma, is...

452

ARM - 2007 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

453

ARM - 2008 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Proceedings Sorted by Author Proceedings Sorted by Title Pictures Award-Winning Posters Presentations Cover Competition Winners Meeting Archives ARM Science Team Meeting...

454

ARM - Instrument - xsacr  

NLE Websites -- All DOE Office Websites (Extended Search)

govInstrumentsxsacr govInstrumentsxsacr Documentation XSACR : Handbook XSACR : Instrument Mentor Monthly Summary (IMMS) reports XSACR : Data Quality Assessment (DQA) reports ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Instrument : X-Band Scanning ARM Cloud Radar (XSACR) Beneficiary of Recovery Act funding. Instrument Categories Cloud Properties Picture of the X-band scanning ARM cloud radar Picture of the X-band scanning ARM cloud radar Note: All the Scanning ARM Cloud Radars have been technically accepted by ARM as meeting specification and each radar's first data are available at this URL: http://www.archive.arm.gov/sacr/. ARM's scanning cloud radars are fully coherent dual-frequency, dual-polarization Doppler radars mounted on a common scanning pedestal.

455

ARM - Events Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 29, 2012 [Events] March 29, 2012 [Events] ARM Attends Third Annual Atmospheric System Research Science Team Meeting Bookmark and Share The ARM Climate Research Facility provided information about the user facility, including a live data kiosk, public information materials, and banners showcasing the three fixed ARM sites. The ARM Climate Research Facility provided information about the user facility, including a live data kiosk, public information materials, and banners showcasing the three fixed ARM sites. The third annual Atmospheric System Research (ASR) Science Team Meeting, held March 12-16 in Arlington, Virginia, brought together members of ASR and the ARM Climate Research Facility. ASR and ARM collaborate through the use of ARM facilities for targeted field campaigns and data gathered at ARM

456

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

457

DRAFT FOR SECRETARIAL REVIEW Proposed Amendment 94 to the Fishery Management Plan for Groundfish of the Bering Sea  

E-Print Network (OSTI)

DRAFT FOR SECRETARIAL REVIEW Proposed Amendment 94 to the Fishery Management Plan for Groundfish Impact Review/ Initial Regulatory Flexibility Analysis April 2010 Lead Agency: National Marine Fisheries Abstract: This Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis

458

Epigastric Hernia in Pregnancy: A Management Plan Based on a Systematic Review of Literature and a Case History  

Science Journals Connector (OSTI)

Symptomatic epigastric hernia is rare in pregnant women. A case history, management of which prompted a systematic review of the literature and proposed plan for treatment of such cases, is hereby ... hernias in ...

Samuel A. Debrah; Amalachukwu M. Okpala

2013-06-01T23:59:59.000Z

459

Identification of Management and Planning Problems of Urban Water Resources in the Metropolitan Area of Greater San Antonio  

E-Print Network (OSTI)

including the inventory and planning control for both surface and ground Water Resource Management of the San Antonio area are presented. Emphasis has been placed upon the identification of the probabilistic nature of various decision-making parameters...

Garner, K.; Shih, C. S.

460

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan  

SciTech Connect

This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309, Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

KOCH, M.R.

1999-11-16T23:59:59.000Z

462

Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)  

SciTech Connect

This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309, Rev. 1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis.

WHITE, K.A.

2000-11-28T23:59:59.000Z

463

Comprehensive low-level radioactive waste management plan for the Commonwealth of Kentucky  

SciTech Connect

Part I of the Comprehensive Low-Level Radioactive Waste Management Plan for the Commonwealth of Kentucky discusses the alternatives that have been examined to manage the low-level radioactive waste currently generated in the state. Part II includes a history of the commercial operation of the Maxey Flats Nuclear Waste Disposal Site in Fleming County, Kentucky. The reasons for closure of the facility by the Human Resources Cabinet, the licensing agency, are identified. The site stabilization program managed by the Natural Resources and Environmental Protection Cabinet is described in Chapter VI. Future activities to be conducted at the Maxey Flats Disposal Site will include site stabilization activities, routine operations and maintenance, and environmental monitoring programs as described in Chapter VII.

Carr, R.M.; Mills, D.; Perkins, C.; Riddle, R.

1984-03-01T23:59:59.000Z

464

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Speedier Data Delivery Assists Storm Forecasters Speedier Data Delivery Assists Storm Forecasters Bookmark and Share SuomiNet is an international network of global positioning system (GPS) receivers, configured and managed to generate near real-time estimates of precipitable water vapor in the atmosphere, total electron content in the ionosphere, and other meteorological and geodetic information. Last fall, scientific collaborators at the National Oceanic and Atmospheric Administration (NOAA) Forecast Systems Laboratory identified a time-delay in the availability of SuomiNet data from the ARM Climate Research Facility's Southern Great Plains (SGP) site in Oklahoma. This delay was impacting short-range weather forecasts used by the National Weather Service's Storm Prediction Center in Norman, Oklahoma. Data from the SGP

465

Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington  

SciTech Connect

This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

Dresel, P Evan

2004-10-25T23:59:59.000Z

466

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 6.0 Program Management  

Energy.gov (U.S. Department of Energy (DOE))

Program Management section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated August 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

467

Web-GIS Based System for the Management of Objections to a Comprehensive Municipal Land Use Plan  

E-Print Network (OSTI)

Web-GIS Based System for the Management of Objections to a Comprehensive Municipal Land Use Plan the land planning process. Geographic information Systems (GIS) have traditionally been used in daily municipalities in which the lack of resources or expert staff who can use this technology makes GIS

Touriño, Juan

468

ARM - 1996 ARM Science Team Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

6 ARM Science Team Meeting 6 ARM Science Team Meeting 1996 Meeting 1996 Meeting Home Proceedings Sorted by Author Proceedings Sorted by Title Meeting Archives ARM Science Team Meeting Proceedings Past Science Team Meetings 1996 ARM Science Team Meeting March 4 - 7 | San Antonio, Texas | Municipal Auditorium The St. Anthony Hotel, as well as the Municipal Auditorium and Conference Center, provided rooms and meeting space. The St. Anthony Hotel, as well as the Municipal Auditorium and Conference Center, provided rooms and meeting space. The fifth ARM Science Team Meeting was held in San Antonio, Texas, at the Municipal Auditorium and Conference Center. The Science Team Meetings were intended to provide opportunities to share scientific findings, focused technical exchanges, and collectively examine the implementation and

469

ARM - Data Announcements Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 1, 2012 [Data Announcements] November 1, 2012 [Data Announcements] New Flagship Data Product Launched Bookmark and Share Climate Modeling Best Estimate Transitioned to ARM Best Estimate Data plot from ARM Best Estimate Cloud Radiation VAP demonstrating cloud fraction at Darwin for 2010. Data plot from ARM Best Estimate Cloud Radiation VAP demonstrating cloud fraction at Darwin for 2010. The ARM showcase data set CMBE, previously released as an evaluation product, transitioned to an ARM production data set and became the first two products of the new ARMBE value-added product. The new flagship ARMBE product name will represent all the ARM best estimate products. Transitioning CMBE to ARMBE required changing the metadata to meet ARM production data standards, but also brings the new release of ARM Best

470

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

YouTube© Channel and Flickr® Added to Outreach Tools YouTube© Channel and Flickr® Added to Outreach Tools Bookmark and Share Look for ARM's new social media bar on the front page and in the ARM News Center. Look for ARM's new social media bar on the front page and in the ARM News Center. Starting this summer, the ARM Communications Team began moving archived ARM photo and video content into both Flickr and YouTube, respectively. These popular and cost-effective social media outlets join ARM's existing Facebook and Twitter accounts, providing additional options for sharing information with users and the public. All four sites can be accessed from the new social media bar on the ARM home page. YouTube offers a free and convenient space for storing videos and animations, and because it is dedicated solely to videos, there is no

471

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 16, 2008 Facility News 21st Century "Paper Boy" Begins Delivering ARM News Bookmark and Share A reorganized ARM News Center now offers RSS feeds-subscription services...

472

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2011 Facility News ARM Mobile Facility Completes Extended Campaign in the Azores; Next Stop-India Bookmark and Share The ARM Mobile Facility obtained data on Graciosa...

473

ARM - Events Article  

NLE Websites -- All DOE Office Websites (Extended Search)

covering all areas of earth and space sciences. In the scientific program, dozens of posters and oral sessions used ARM data in their results. In the Exhibit Hall, the ARM...

474

ARM - Measurement - Lightning stroke  

NLE Websites -- All DOE Office Websites (Extended Search)

govMeasurementsLightning stroke ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Measurement :...

475

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Codes in Climate Models (ICRCCM-1) are now included at the ARM Data Archive. This 1980s climate modeling project eventually led to the creation of the ARM Program. Included in...

476

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

around the new ARM educational kiosk to learn more about climate change. Surround by the Pacific Ocean, the Republic of Nauru is one of three sites that make up the ARM Tropical...

477

ARM Water Vapor IOP  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Water Vapor IOP The SGP CART site will host the third ARM water vapor IOP on September 18-October 8, 2000. The CART site is home to a powerful array of instruments capable of...

478

ARM - Data Plots  

NLE Websites -- All DOE Office Websites (Extended Search)

Plots Data Plots ARM Program data is available in daily diagnostic plots that can be easily grouped into daily, weekly, monthly, and even yearly increments. By visualizing ARM data...

479

ARM Orientation Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Data from the Getting Data from the Data from the Getting Data from the ARM Archive ARM Archive Orientation for new Science Team Members ARM Shopping Cart Tutorial ARM Shopping Cart Tutorial Available at: Available at: http://dev.www.arm.gov/data/arm_orderData_tutorial.html http://dev.www.arm.gov/data/arm_orderData_tutorial.html Types of Quality Information Types of Quality Information Automated products Automated products QC flags QC flags inserted in data files during processing inserted in data files during processing Summaries of flags (data color) Summaries of flags (data color) Manual products Manual products Data Quality Reports (DQRs) Data Quality Reports (DQRs) web accessible reports; delivered as html files after data web accessible reports; delivered as html files after data

480

Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "arm management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Environmental management 1994. Progress and plans of the environmental restoration and waste management program  

SciTech Connect

The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

Not Available

1994-02-01T23:59:59.000Z

482

ARM TR-008  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM-TR-073 ARM-TR-073 W-band ARM Cloud Radar (WACR) Handbook April 2006 K. B. Widener K. Johnson Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research April 2006, ARM TR-073 Contents 1 General Overview ............................................................................................................................... 1 2 Contacts............................................................................................................................................... 1 3 Deployment Locations and History..................................................................................................... 2 4 Near-Real-Time Data Plots .................................................................................................................

483

WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern.  

SciTech Connect

This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

Washington TRU Solutions LLC

2000-05-23T23:59:59.000Z

484

RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY  

SciTech Connect

WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modified in 40 CFR Part 265, Subpart F and Washington States Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

Horton, Duane G.

2007-03-26T23:59:59.000Z

485

Comparison of selected foreign plans and practices for spent fuel and high-level waste management  

SciTech Connect

This report describes the major parameters for management of spent nuclear fuel and high-level radioactive wastes in selected foreign countries as of December 1989 and compares them with those in the United States. The foreign countries included in this study are Belgium, Canada, France, the Federal Republic of Germany, Japan, Sweden, Switzerland, and the United Kingdom. All the countries are planning for disposal of spent fuel and/or high-level wastes in deep geologic repositories. Most countries (except Canada and Sweden) plan to reprocess their spent fuel and vitrify the resultant high-level liquid wastes; in comparison, the US plans direct disposal of spent fuel. The US is planning to use a container for spent fuel as the primary engineered barrier. The US has the most developed repository concept and has one of the earliest scheduled repository startup dates. The repository environment presently being considered in the US is unique, being located in tuff above the water table. The US also has the most prescriptive regulations and performance requirements for the repository system and its components. 135 refs., 8 tabs.

Schneider, K.J.; Mitchell, S.J.; Lakey, L.T.; Johnson, A.B. Jr.; Hazelton, R.F.; Bradley, D.J.

1990-04-01T23:59:59.000Z

486

2012 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2013 18, 2013 MEMORANDUM FOR KAREN L. BOARDM AN CHAIRP ERSON rROM: SU BJ ECT: REFERENCE: FEDE RAL TECHN ICA L CAPABILITIES PANEL MARK WI IITNEY It J I MAN AG ER VV"-c.--'\<.- OAK RIDGE OFFICE or ENV IRONMENT/\L M~ OAK RIDG E OFFICE OF ENVIRONMENT/\ L M/\NAGEMENT ANNUAL WORKFORCE ANAL YSJS AND STAFFING REPORT Memorandum from Karen L. Boardman to Distribution, Annual Workfhrce Analysis and Stqfftng Plan Report f(Jr Calendar Year 20 12, dated October 24, 20 12 As requested, attached is the Oak Ridge Office of Environmental Manage ment (OREM) Calendar Year 2012 annual workforce anal ys is and staffing plan th at identifi es the technica l capabil iti es and pos itions ORe:M needs to ensure safe operations of OREM assigned nuc lear faci liti es. This report is submitted for incorporation into the Federa

487

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Centre for Sustainable Information Management: A Business Plan  

E-Print Network (OSTI)

/documents management. #12;The Centre for Sustainable Information Management (CSIM): A Business Plan iii The design of the CSIM building will be Gold Leadership in Energy and Environmental Design (LEED) certified. The facilityUBC Social Ecological Economic Development Studies (SEEDS) Student Report Centre for Sustainable

488

A web-based GIS Decision Support System for managing and planning USDA's Conservation Reserve Program (CRP)  

E-Print Network (OSTI)

A web-based GIS Decision Support System for managing and planning USDA's Conservation Reserve of a prototype web-GIS Decision Support System (DSS), CRP-DSS, for use in resource management and assessment enrollments. The DSS is based on the emerging industry-standard ArcIMS GIS platform and integrates a mapping

Fan, Guoliang

489

Management Plan J.W. Munger and S.C. Wofsy School of Engineering and Applied Sciences, Harvard University  

NLE Websites -- All DOE Office Websites (Extended Search)

Data-Assimilation Framework for Integrating Data-Assimilation Framework for Integrating 25 Years of Surface and Airborne observations to assess patterns of net CO2 Exchange from Arctic Ecosystems: Data Management Plan J.W. Munger and S.C. Wofsy School of Engineering and Applied Sciences, Harvard University The following Data Management Plan was part of the NASA ROSES 2012 Proposal Development of a Data-Assimilation Framework for Integrating 25 Years of Surface and Airborne observations to assess patterns of net CO2 Exchange from Arctic Ecosystems (summary) submitted to the Terrestrial Ecology Program. It is presented as an example plan. Data Management Plan Our group is strongly committed to providing open access to data and model products. Ongoing and past projects post all data on local ftp

490

AMIE (ARM MJO Investigation Experiment):  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 AMIE (ARM MJO Investigation Experiment): Observations of the Madden-Julian Oscillation for Modeling Studies Science Plan ARM Climate Research Facility Tropical Western Pacific Manus Site October 2011-March 2012 C Long Principal Investigator A DelGenio P May W Gustafson S McFarlane R Houze P Minnis C Jakob C Schumacher M Jensen A Vogelmann S Klein Y Wang L Ruby Leung X Wu X Liu S Xie E Luke March 2010 DISCLAIMER This report was prepared as an account of work sponsored by the U.S Government Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed,

491

ARM - Instrument - kasacr  

NLE Websites -- All DOE Office Websites (Extended Search)

govInstrumentskasacr govInstrumentskasacr Documentation KASACR : Handbook KASACR : Instrument Mentor Monthly Summary (IMMS) reports KASACR : Data Quality Assessment (DQA) reports ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Instrument : Ka-Band Scanning ARM Cloud Radar (KASACR) Beneficiary of Recovery Act funding. Instrument Categories Cloud Properties Note: All the Scanning ARM Cloud Radars have been technically accepted by ARM as meeting specification and each radar's first data are available at this URL: http://www.archive.arm.gov/sacr/. ARM's scanning cloud radars are fully coherent dual-frequency, dual-polarization Doppler radars mounted on a common scanning pedestal. Each pedestal includes a Ka-band radar (2kW peak power) and the deployment

492

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

2, 2012 [Data Announcements, Facility News] 2, 2012 [Data Announcements, Facility News] Toolkit for ARM Radar Data Previewed at Workshop Bookmark and Share This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge. This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge.

493

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2006 [Facility News] March 31, 2006 [Facility News] New Chief Scientist Leads Annual ARM Science Team Meeting Bookmark and Share Dr. Warren Wiscombe begins his presentation by introducing the members of his "Chief Scientist team"-a new approach for leading the ARM Science Team. Dr. Warren Wiscombe begins his presentation by introducing the members of his "Chief Scientist team"-a new approach for leading the ARM Science Team. With a new Chief Scientist at the helm, just over 300 ARM scientists and ARM infrastructure staff took part in the 16th ARM Science Team meeting held in Albuquerque, New Mexico, on March 27-31, 2006. After an initial day of focused meetings among the ARM Working Groups, Dr. David Thomassen, Acting Associate Director of DOE's Office of Biological and Environmental

494

Managing nuclear materials from retired weapons: An overview of U.S. plans, programs and goals  

SciTech Connect

In September 1993, the Congressional Office of Technology Assessment (OTA) published a report entitled ``Dismantling the Bomb and Managing the Nuclear Materials``. That study evaluated the current activities as well as the future challenges inherent in retiring many thousands of nuclear weapons in the US and Russia; dismantling the warheads; and safely and securely disposing of the constituent materials.The warhead dismantlement process has been underway for a few years in both nations but long-range plans and policies are still in the early stages of development. At present both the plutonium and highly-enriched uranium removed from retired weapons is stored temporarily awaiting decisions about its ultimate fate.

Johnson, P.A. [Office of Technology Assessment, Washington, DC (United States)

1995-12-31T23:59:59.000Z

495

Project plan, Hazardous Materials Management and Emergency Response Training Center: Project 95L-EWT-100  

SciTech Connect

The Hazardous Materials Management and Emergency Response (HAMMER) Training Center will provide for classroom lectures and hands-on practical training in realistic situations for workers and emergency responders who are tasked with handling and cleanup of toxic substances. The primary objective of the HAMMER project is to provide hands-on training and classroom facilities for hazardous material workers and emergency responders. This project will also contribute towards complying with the planning and training provisions of recent legislation. In March 1989 Title 29 Code of Federal Regulations Occupational Safety and Health Administration 1910 Rules and National Fire Protection Association Standard 472 defined professional requirements for responders to hazardous materials incidents. Two general types of training are addressed for hazardous materials: training for hazardous waste site workers and managers, and training for emergency response organizations.

Borgeson, M.E.

1994-11-09T23:59:59.000Z

496

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

497

ARM - 2011 AGU Presentations Featuring ARM Data  

NLE Websites -- All DOE Office Websites (Extended Search)

11:50 am, M-West, 3006 Oral A32C-08. Statistics of Convective Cores Using ARM UHF Wind Profilers During the Oklahoma MC3E Campaign S Giangrande, N Dulaney, SM Collis, MP...

498

Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.  

SciTech Connect

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and