Powered by Deep Web Technologies
Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Summary of radioactive solid waste received in the 200 areas during calendar year 1996  

Science Conference Proceedings (OSTI)

Rust Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1996. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document.

Hladek, K.L.

1997-05-21T23:59:59.000Z

2

CALENDAR YEAR 2011 ANNUAL SECURITY  

E-Print Network (OSTI)

CALENDAR YEAR 2011 ANNUAL SECURITY FIRE SAFETY REPORT& #12;University of North Dakota Annual Security & Fire Safety Report: Calendar Year 2011 n Page 1 Dear Community Member: I am pleased to introduce the 2011 Annual Security and Fire Safety Report for the University of North Dakota. This report

Delene, David J.

3

Calendar Year 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-FS-14-03 http://energy.gov/ig/downloads/audit-report-oas-fs-14-03 Audit Report: OAS-FS-14-03

4

Calendar Year 2003 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Year 2003 Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan December 22, 2003...

5

Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1982  

Science Conference Proceedings (OSTI)

A principal activity of the Offsite Radiological Safety Program is routine environmental monitoring for radioactive materials in various media and for radiation in areas which may be affected by nuclear tests. It is conducted to document compliance with standards, to identify trends, and to provide information to the public. This report summarizes these activities for CY 1982.

Black, S. C.; Grossman, R. F.; Mullen, A. A.; Potter, G. D.; Smith, D. D. [comps.

1983-07-01T23:59:59.000Z

6

Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1991  

Science Conference Proceedings (OSTI)

This report describes the Offsite Radiation Safety Program conducted during 1991 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory-Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release. Comparison of the measurements and sample analysis results with background levels and with appropriate standards and regulations indicated that there was no radioactivity detected offsite by the various EPA monitoring networks and no exposure above natural background to the population living in the vicinity of the NTS that could be attributed to current NTS activities. Annual and long-term trends were evaluated in the Noble Gas, Tritium, Milk Surveillance, Biomonitoring, TLD, PIC networks, and the Long-Term Hydrological Monitoring Program.

Chaloud, D.J.; Dicey, B.B.; Mullen, A.A.; Neale, A.C.; Sparks, A.R.; Fontana, C.A.; Carroll, L.D.; Phillips, W.G.; Smith, D.D.; Thome, D.J.

1992-01-01T23:59:59.000Z

7

Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1993  

Science Conference Proceedings (OSTI)

This report describes the Offsite Radiation Safety Program conducted during 1993 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory - Las Vegas (EMSL-LV). This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ionization chambers (PICs); by biological monitoring of foodstuffs including animal tissues and food crops; and by measurement of radioactive material deposited in humans.

Chaloud, D.J; Daigler, D.M.; Davis, M.G. [and others

1996-06-01T23:59:59.000Z

8

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

9

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

10

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

11

Calendar Year Reports Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Archive Calendar Year Reports Archive October 3, 2013 Special Inquiry: DOEIG-0895 Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power...

12

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

13

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

14

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

15

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

16

Calendar Year Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

17

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

18

Calendar Year 2000 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

19

Calendar Year 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

20

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Calendar Year 2008 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Calendar Year 2008 RSS December 23, 2008 Special Report: IG-0808 Management Challenges at the Department of Energy December 11, 2008 Inspection Report: INS-O-09-01 Security Clearances at Lawrence Livermore National Laboratory and Sandia National Laboratory-California December 9, 2008 Audit Report: IG-0807 Cyber Security Risk Management Practices at the Bonneville Power Administration November 25, 2008 Inspection Report: IG-0806 40 MM Grenade Launcher Qualification Requirements at Department of Energy Sites November 20, 2008 Audit Report: IG-0805 Cyber Security Risk Management Practice at the Southeastern, Southwestern, and Western AreaPower Administrations November 19, 2008 Inspection Summary Report Issues Related to the Production of Components for the W76 Weapon System

22

Calendars  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendars Calendars Nature Bulletin No. 447-A March 4, 1972 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation CALENDARS This is a Leap Year with 366 days instead of the usual 365, and 29 days in February. Julius Caesar was responsible for that. The Roman calendar was patterned after those of the ancient Greeks and Egyptians which, in turn, had been modeled on that of the early Sumerians in Babylonia. The Sumerians had 12 lunar months in a year but every so often, to make up for the difference between that year and the year of the natural seasons, their astronomer-priests inserted an extra month. The Roman year was too short. It had had only 365 days for so many centuries that their calendar was badly out of step with the seasons and something had to be done about it. The summer months were coming in spring. Caesar's astronomers told him the reason: instead of being exactly 365 days long, a year was 365 and one-quarter days in length. Julius then solved the problem -- so he thought -- by establishing a leap year of 366 days every fourth year. He put the extra day in February because that was the last month on the old Roman calendar. Their new year started on the first day of March.

23

Hanford Site Environmental Report for Calendar Year 2001  

SciTech Connect

This report summarizes environmental information for the Hanford Site in Washington State for the calendar year 2001.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2002-09-02T23:59:59.000Z

24

Site Environmental Report-Calendar Year 2001  

Science Conference Proceedings (OSTI)

The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

Dan Kayser

2002-09-03T23:59:59.000Z

25

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004  

Science Conference Proceedings (OSTI)

This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

2005-04-01T23:59:59.000Z

26

Site environmental report for calendar year 1996  

Science Conference Proceedings (OSTI)

This Annual Site Environmental Report presents information pertaining to environmental activities conducted during calendar year 1996 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN-Grand Junction, the Facility Operations and Support contractor for the GJO, prepared this report in accordance with the requirements of DOE Order 5400.1, General Environmental Protection Program, and supplemental guidance from DOE Headquarters. This report applies specifically to the GJO facility; the Monticello Mill Tailings Site Environmental Summary for Calendar Year 1996 was prepared as a separate document. Primary GJO activities involve laboratory analysis of environmental samples from GJO and other DOE sites and site remediation of contamination caused by previous uranium mill operations. Activities at the GJO are conducted in compliance with applicable Federal, State, and local regulations and requirements and as directed by applicable DOE orders. Environmental monitoring is performed on air emissions, sewer effluent, surface water and groundwater, and wetlands restoration. Wastes are generated from the Analytical Laboratory, site remediation, and facility operation.

NONE

1997-06-01T23:59:59.000Z

27

Annual Site Environmental Report Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

28

Calendar Year 2012 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Calendar Year 2012 RSS December 21, 2012 Audit Report: OAS-L-13-03 The Management of the Plateau Remediation Contract December 21, 2012 Audit Report: IG-0879 Naval Reactors Information Technology System Development Efforts December 17, 2012 Audit Report: OAS-FS-13-08 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 December 11, 2012 Audit Report: IG-0878 Follow-up Audit of the Department's Cyber Security Incident Management Program December 3, 2012 Audit Report: OAS-RA-L-13-02 The Department's Implementation of Financial Incentive Programs under the Energy Efficiency and Conservation Block Grant Program November 30, 2012 Inspection Report: INS-O-13-02 Tactical Response Force Pursuit Operations at Idaho National Laboratory

29

Calendar Year 2011 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Calendar Year 2011 RSS December 21, 2011 Inspection Report: INS-L-12-01 Follow-up Review of Control and Accountability of Emergency Communication Network Equipment December 16, 2011 Inspection Report: INS-RA-L-12-01 Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation November 28, 2011 Special Report: OAS-RA-L-12-01 Special Inquiry on the Office of the Chief Financial Officer's Information Technology Expenditures November 15, 2011 Evaluation Report: OAS-M-12-01 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011 November 10, 2011 Special Report: IG-0858 Management Challenges at the Department of Energy - Fiscal Year 2012 November 9, 2011 Audit Report: OAS-RA-12-02 The State of Nevada's Implementation of the Energy Efficiency and

30

POST CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C.

NA

2006-03-01T23:59:59.000Z

31

Calendar Year 1996 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 1996 Documents marked with the * are published in Adobe PDF format. 1996-11-21 - Report IG-0398: Special Report on the Audit of the Management of Department of Energy Construction Projects 1996-11-15 - Report WR-B-97-03: Audit of Groundwater Monitoring at Hanford 1996-11-07 - Report WR-B-97-02: Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory 1996-11-06 - Report WR-B-97-01: Audit of Electrical System Construction Projects at the Nevada Operations Office 1996-10-22 - Report ER-B-97-01: Audit of Economic Development Grants and a Cooperative Agreement with East Tennessee Not-For-Profit Organizations 1996-10-13 - Report INS-9601: Report on the Intelligence Oversight Inspection of the Special Technologies Laboratory 1996-10-07 - Report IG-0397:*

32

Calendar Year 2007 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Calendar Year 2007 RSS December 19, 2007 Inspection Report: IG-0784 The Department of Energy's Pandemic Influenza Planning December 18, 2007 Audit Report: OAS-M-08-04 Management Controls over Operations of the Integrated Disposal Facility atthe Hanford Site December 17, 2007 Audit Report: IG-0783 Beryllium Surface Contamination at the Y-12 National Security Complex December 13, 2007 Special Report: IG-0782 Management Challenges at the Department of Energy December 11, 2007 Audit Report: OAS-L-08-03 The Department of Energy's Implementation of Revised OMB Circular No. A-123 December 11, 2007 Audit Report: OAS-M-08-03 Management Controls over Implementation of the Homeland Defense Equipment Reuse Program November 28, 2007 Audit Letter Report: OAS-L-08-02 Department's Implementation of the Strategic Integrated Procurement

33

Calendar Year 2010 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Calendar Year 2010 RSS December 20, 2010 Audit Report: OAS-RA-L-11-02 Audit of Environmental Cleanup Projects Funded by the Recovery Act at the Y-12 National Security Complex December 3, 2010 Investigative Report: INV-RA-11-01 Management Alert on the State Energy Efficient Appliance Rebate Program November 30, 2010 Audit Report: OAS-RA-11-03 The Department of Energy's Weatherization Assistance Program under the American Recovery and Reinvestment Act for the City of Phoenix - Agreed-Upon Procedures November 17, 2010 Inspection Letter Report: INS-L-11-01 Letter Report on "Inspection of Allegations Relating to Irregularities in the Human Reliability Program and Alcohol Abuse within the Office of Secure Transportation November 16, 2010 Special Report: IG-0844

34

Calendar Year 1998 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Calendar Year 1998 Documents marked with the * are published in Adobe PDF format. 1998-12-21 - Report ER-B-99-01:* Audit Report on "Decontamination and Decommissioning at the East Tennessee Technology Park" 1998-12-04 - Report WR-B-99-01:* Audit Report on "Transportation Safeguards Division Courier Work Schedule and Escort Vehicle Replacements" 1998-12-18 - Report IG-0434:* Audit Report on "Waste Inventory Data at Oak Ridge and Savannah River" 1998-12-03 - Report IG-0433:* Report on "Inspection of Department of Energy Conference Policies and Practices" 1998-11-20 - Report IG-0432:* Audit Report on "The U.S. Department of Energy's Efforts to Increase The Financial Responsibility Of Its Major For-Profit Operating Contractors"

35

Calendar Year 2006 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 2006 RSS December 18, 2006 Audit Letter Report: OAS-L-07-04 Inquiry to the Hotline Complaint on Possible Design Mistakes and Cost Overruns of the Linac Coherent Light Source Project at Stanford Linear Accelerator Center December 18, 2006 Audit Report: IG-0750 The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams December 14, 2006 Audit Report: IG-0749 The Department's Energy, Science,and Environment Sites' Implementationof the Design Basis Threat December 13, 2006 Special Report: IG-0748 Management Challenges at the Department of Energy December 5, 2006 Audit Report: IG-0747 The Department of Energy's Use of the Strategic Petroleum Reserve in Response to Hurricanes Katrina and Rita November 29, 2006 Inspection Report: IG-0746

36

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Calendar Year 2005 RSS December 30, 2005 Audit Report: OAS-M-06-03 Management Controls over the University of California's Contributions to the Los Alamos National Laboratory Foundation December 21, 2005 Audit Report: IG-0713 Status of the Mixed Oxide Fuel Fabrication Facility December 20, 2005 Audit Report: OAS-L-06-04 Federal Managers' Financial Integrity Act December 20, 2005 Audit Report: OAS-L-06-03 Defense Waste Processing Facility Operations at the Savannah River Site December 14, 2005 Special Report: IG-0712 Management Challenges at the Department of Energy December 5, 2005 Audit Report: IG-0711 Demolition and Replacement of Hanford's Radiological Calibration Laboratory November 25, 2005 Audit Report: OAS-M-06-02 Management Controls over Assessing Natural Resource Damage at Rocky Flats

37

Calendar Year 2002 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Calendar Year 2002 Documents marked with the * are published in Adobe PDF format. 2002-12-31 - Report IG-0580:* Special Report on "Management Challenges at the Department of Energy" 2002-12-23 - Report IG-0579:* Audit Report on "The Department's Unclassified Foreign Visits and Assignments Program" 2002-12-19 - Report IG-0578:* Inspection Report on "Inspection of Explosives Safety at Selected Department of Energy Sites" 2002-12-18 - Report IG-0577:* Audit Report on "Planned Characterization Capability At The Waste Isolation Pilot Plant" 2002-12-03 - Report OAS-L-03-03:* Audit Report on "Follow-Up Audit on the Department's Management of Field Contractor Employees Assigned to Headquarters and Other Federal Agencies"

38

Calendar Year 1999 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1999 1999 Calendar Year 1999 Documents marked with the * are published in Adobe PDF format. 1999-12-22 - Report IG-0455: * Inspection Report on "Inspection of the Sale of a Paragon Supercomputer by Sandia National Laboratories" 1999-12-16 - Report INS-O-00-02: * Inspection Report on "Inspection of Alleged Improprieties Regarding Issuance of a Contract" 1999-12-15 - Report IG-0454:* Audit Report on "Waste Incineration at the Idaho National Engineering and Environmental Laboratory" 1999-12-10 - Report WR-B-OO-02:* Audit Report on "Properties and Facilities at Grand Junction" 1999-11-30 - Report INS-O-00-01:* Inspection Report on "Inspection of Selected Issues of the Chem-Bio Facility at the Oak Ridge National Laboratory"

39

Calendar Year 1997 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Calendar Year 1997 Documents marked with the * are published in Adobe PDF format. 1997-12-23 - Report IG-0416:* Audit of Support Services Subcontracts at Argonne National Laboratory 1997-12-10 - Report ER-B-98-05:* Audit of the Department of Energy's Contracts with Envirocare of Utah, Inc. 1997-12-05 - Report IG-0414:* Audit of the Department of Energy's Management of Field Contractor Employees Assigned to Headquarters and Other Federal Agencies 1997-12-04 - Report IG-0415:* Audit of Departmental Receipt of Final Deliverables for Grant Awards 1997-11-24 - Report ER-B-98-04:* Audit of Selected Government-Funded Grants and Contracts at Princeton University 1997-11-19 - Report WR-B-98-01:* Audit of the Radioactive Liquid Waste Treatment Facility Operations at the

40

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Calendar Year 2004 RSS December 14, 2004 Audit Report: IG-0669 Use and Management of Mobile Communications Services December 10, 2004 Audit Report: OAS-L-05-01 Federal Managers' Financial Integrity Act Audit Report December 8, 2004 Inspection Report: IG-0668 Concerns Regarding Academic Programs at the Bonneville Power Administration and the Savannah River Operations Office November 30, 2004 Special Report: IG-0667 Management Challenges at the Department November 30, 2004 Audit Report: IG-0666 Audit Report on "The Los Alamos Neutron Science Center October 28, 2004 Audit Report: IG-0665 Restoration of the Monticello Mill Site at Monticello, Utah September 27, 2004 Audit Report: IG-0664 Property Disposals at the Yucca Mountain Project September 24, 2004 Inspection Report: IG-0663

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Calendar Year 2001 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Calendar Year 2001 Documents marked with the * are published in Adobe PDF format. 2001-12-21 - Report IG-0537:* Audit Report on "Telecommunications Infrastructure" 2001-12-20 - Report IG-0536:* Inspection Report on "Follow-on Inspection of the Department of Energy's Value Engineering Program" 2001-12-21 - Report IG-0538:* Special Report on "Management Challenges at the Department of Energy" 2001-12-18 - Report IG-0535:* Audit Report on "Management of the Stockpile Surveillance Program's Significant Finding Investigations" 2001-12 - Report IG-0534:* Inspection Report on "Inspection of Lawrence Livermore National Laboratory Protective Force and Special Response Team " 2001-12-07 - Report IG-0533:* Inspection Report on "Inspection of the Department of Energy's Automated

42

Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006 are included in Appendix C of this report.

NSTec Environmental Restoration

2007-03-01T23:59:59.000Z

43

Update on EH-23 activities in Calendar Year 1993  

SciTech Connect

This report briefly describes the activities undertaken by the US DOE`s Office of Environmental Guidance (EH-23) of the Office of the Deputy Assistant Secretary for Environment (EH-20) in Calendar Year (CY) 1993 in seven major areas: (1) regulatory review and analysis; (2) environmental policy and guidance; (3) environmental training courses and workshops; (4) workgroups and committees; (5) environmental regulatory management support; (6) special projects and other activities; and (7) special presentations. A list of selected environmental guidance memoranda and documents distributed by EH-23 in CY 1993 is also included.

Not Available

1994-07-01T23:59:59.000Z

44

Annual Waste Minimization Summary Report, Calendar Year 2008  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2008.

NSTec Environmental Management

2009-02-01T23:59:59.000Z

45

Annual Site Environmental Report Calendar Year 2007  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

46

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U. S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites CAS 58-09-02, Mud Pit and 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits 9, an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action. Quarterly post-closure inspections are performed at the CASs that were closed in place at UC-I, UC-3, and UC-4. During calendar year 2005, site inspections were performed on March 15, June 16, September 22, and December 7. The inspections conducted at the UC-1 CMP documented that the site was in good condition and continued to show integrity of the cover unit. No new cracks or fractures were observed until the December inspection. A crack on the west portion of the cover showed evidence of lateral expansion; however, it is not at an actionable level. The crack will be sealed by filling with bentonite during the first quarter of 2006 and monitored during subsequent inspections. The cover vegetation was healthy and well established. No issues were identified with the CMP fence, gate, or subsidence monuments. No issues were identified with the warning signs and monuments at the other two UC-1 locations. The inspections at UC-3 indicated that the sites are in excellent condition. All monuments and signs showed no displacement, damage, or removal. A small erosion gully from spring rain runoff was observed during the June inspection, but it did not grow to an actionable level during 2005. No other issues or concerns were identified. Inspections performed at UC-4 Mud Pit C cover revealed that erosion rills were formed during March and September exposing the geosynthetic clay liner. Both erosion rills were repaired within 90 days of reporting. Sparse vegetation is present on the cover. The overall condition of the monuments, fence, and gate are in good condition. No issues were identified with the warning signs and monuments at the other four UC-4 locations. Subsidence surveys were conducted at UC-1 CMP and UC-4 Mud Pit C in March and September of 2005. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. The June vegetation survey of the UC-1 CMP cover and adjacent areas indicated that the revegetation has been very successful. The vegetation should continue to be monitored to document any changes in the plant community and identify conditions that could potentially require remedial action in order to maintain a viable vegetative cover on the site. Vegetation surveys should be conducted only as required. Precipitation during 2005 was above average, with an annual rainfall total of 21.79 centimeters (8.58 inches). Soil moisture content data show that the UC-1 CMP cover is performing as designed, with evapotranspiration effectively removing water from the cover. It is recommended to continue quarterly site inspections and the collection of soil moisture data for the UC-1 CMP cove

NONE

2006-04-01T23:59:59.000Z

47

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 26, 2012 October 26, 2012 Special Report: IG-0875 Review of the Compromise of Security Test Materials at the Y-12 National Security Complex October 22, 2012 Audit Report: IG-0873 Management of Western Area Power Administration's Cyber Security Program October 19, 2012 Special Report: IG-0874 Management Challenges at the Department of Energy - Fiscal Year 2013 October 17, 2012 Examination Report: OAS-RA-13-03 Community Action Partnership of Orange County - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 October 16, 2012 Management Alert: IG-0872 The Department of Energy's Management of Foreign Travel October 9, 2012 Examination Report: OAS-RA-13-02 County of Los Angeles - Energy Efficiency and Conservation Block Grant

48

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2005 November 17, 2005 Audit Report: IG-0709 Management of the Department's Isotope Program November 17, 2005 Audit Report: IG-0710 Management of Facility Contractors Assigned to the Washington, D.C. Area November 14, 2005 Audit Report: OAS-FS-06-01 Report o the Department of Energy's Fiscal Year 2005 Consolidated Financial Statements November 9, 2005 Audit Report: OAS-L-06-01 The Department of Energy's Radio Communications Systems November 9, 2005 Special Report: IG-0707 The Department of Energy's Response to Hurricanes Katrina and Rita November 9, 2005 Inspection Report: IG-0708 Quality Assurance Weaknesses in the Review of Yucca Mountain Electronic Mail for Relevancy to the Licensing Process October 17, 2005 Audit Report: IG-0706 Accelerated Tank Waste Retrieval Activities at the Hanford Site

49

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 25, 2003 September 25, 2003 Inspection Report: IG-0621 Firearms Internal Controls at the Lawrence Livermore National Laboratory September 25, 2003 Audit Report: OAS-L-03-22 Audit of Relocation of Administrative Personnel from A-Area to B-Area at the Savannah River Site September 22, 2003 Audit Report: OAS-L-03-21 Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2003" September 16, 2003 Inspection Report: IG-0619 The Security Afforded Selected Tritium Reservoir Shipments (U) September 16, 2003 Evaluation Report: IG-0620 The Department's Unclassified Cyber Security Program-2003 September 11, 2003 Audit Report: OAS-L-03-20 Audit of Procurement Administration at the Oak Ridge National Laboratory September 4, 2003 Audit Report: IG-0618

50

Post-Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area Tonopah Test Range, Nevada, Calendar Year 2001  

SciTech Connect

Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CAU] 407) (Figure 1) are described in Closure Report for Corrective Action Unit 407, Roller Coaster RadSafe Area, Tonopah Test Range, Nevada, report number DOEN-694, October 2001. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on April 24,2001. No issues with the post-closure monitoring plan, Section 5 .O, were raised. However, other concerns raised by stakeholders required that the CR be revised. Revision 1 of CR was issued in December of 2001 and was approved by NDEP on January 7,2002. Section 5.2 of the NDEP-approved CR calls for site inspections to be conducted within the first six months following completion of cover construction. Following the first six months, site inspection are to be conducted twice yearly for the next two years. This report provides the results of the six month post-construction site inspection. As stated in Section 5.2 of the CR, Post-closure site inspections at CAU 407 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. To meet the fiscal year 2002 post-closure inspection schedule, the first post-closure site inspection was conducted on November 6,2001. The site inspection was conducted after completion of the revegetation activities (October 24,2000) and submittal of revision 0 of the CR (October 31,2001). All site inspections were conducted in accordance with the Post-Closure Inspection requirements stated in revision 0 of the CR. This report includes copies of inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklist is found in Attachment A, a copy of the field notes is found in Attachment By and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

51

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2012 November 15, 2012 Audit Report: OAS-FS-13-04 Department of Energy's Fiscal Year 2012 Consolidated Financial Statement November 15, 2012 Audit Report: OAS-FS-13-03 The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit November 8, 2012 Evaluation Report: IG-0877 The Department's Unclassified Cyber Security Program - 2012 November 8, 2012 Examination Report: OAS-RA-13-04 The Department of Energy's American Recovery and Reinvestment Act Energy Efficiency and Conservation Block Grant Program - Efficiency Maine Trust November 7, 2012 Evaluation Report: OAS-L-13-01 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012 November 6, 2012 Audit Report: IG-0876 The Department of Energy's Small Business Innovation Research and Small

52

Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000  

SciTech Connect

Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

53

Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5 , 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 453 consists of the following: (1) Visual site inspections are conducted twice a year to evaluate the condition of the cover. (2) Verification that the site is secure and the condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 15, 2001 and November 6, 2001. Both site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

54

Summary of Fire Protection Programs for Calendar Year 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMMARY of SUMMARY of FIRE PROTECTION PROGRAMS for CALENDAR YEAR 2007 UNITED STATES DEPARTMENT OF ENERGY Office of Corporate Safety Analysis Office of Nuclear Safety Policy and Assistance February 2009 Fire Protection Summary for Calendar Year 2007 i ii i FOREWORD A key safety objective of the U. S. Department of Energy (DOE) is to minimize the potential for and consequences of fires at DOE facilities. Since May 1950, an annual Fire Protection Program Summary (Annual Summary) has been developed by DOE and its predecessor agencies, the Atomic Energy Commission and the Energy Research Development Administration, to provide a means for measuring how well DOE is meeting this objective and where improvements can be made. In 1999, the Annual Summary reporting process was automated to streamline data collection and

55

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2005 March 8, 2005 Audit Report: OAS-M-05-03 Management Controls over Alternative Financing for Office and Support Facilities at Y-12 February 22, 2005 Inspection Report: IG-0677 Security and Other Issues Related to Out-Processing of Employees at Los Alamos National Laboratory February 18, 2005 Audit Report: OAS-L-05-03 Audit of the Office of Science Security Procedures February 14, 2005 Audit Report: OAS-M-05-02 Management Controls over Western Area Power Administration's Central Valley Project Transmission Services February 14, 2005 Audit Report: IG-0676 Department of Energy Contractor Home Office Expenses February 11, 2005 Inspection Report: IG-0674 Unauthorized Handguns on the Nevada Test Site February 11, 2005 Audit Report: IG-0675 The Department's Federal Purchase Card Program at Headquarters

56

Calendar Year 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 20, 2011 October 20, 2011 Evaluation Report: IG-0856 The Department's Unclassified Cyber Security Program - 2011 September 30, 2011 Examination Report: OAS-RA-11-20 People's Equal Action and Community Effort, Inc. -Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 September 30, 2011 Examination Report: OAS-RA-11-21 Action for a Better Community, Inc. - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 September 30, 2011 Audit Report: OAS-RA-L-11-13 The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility September 29, 2011 Examination Report: OAS-RA-11-18 Community Action Partnership of the Greater Dayton Area - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment

57

Calendar Year 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 22, 2008 May 22, 2008 Inspection Report: IG-0794 Office of Science Laboratory Conferences May 20, 2008 Audit Report: OAS-L-08-10 Audit of Joint Appointments at Office of Science Laboratories April 28, 2008 Audit Report: OAS-M-08-07 Yucca Mountain Project Document Suspension April 24, 2008 Audit Report: OAS-M-08-06 Management Controls over Defense Related High Risk Property April 17, 2008 Audit Report: OAS-L-08-09 The Department's Controls over Leased Space in the National CapitalArea April 11, 2008 Audit Report: IG-0793 The Department's Progress in Meeting Los Alamos National Laboratory Consent Order Milestones April 2, 2008 Special Report: IG-0792 Review of Alleged Conflicts of Interest Involving a Legal Services Contractor forthe Yucca Mountain Project License Application

58

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 28, 2013 March 28, 2013 Examination Report: OAS-RA-13-17 Community Action Partnership of San Bernardino County - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 March 28, 2013 Audit Report: OAS-RA-13-16 The Department of Energy's American Recovery and Reinvestment Act Energy Efficiency and Conservation Block Grant Program-State of Colorado and County of Boulder March 22, 2013 Inspection Report: DOE-IG-0882 Approval of Contractor Executive Salaries by Department of Energy Personnel March 21, 2013 Audit Report: OAS-RA-13-15 The Department of Energy's Industrial Carbon Capture and Storage Program Funded by the American Recovery and Reinvestment Act March 20, 2013 Inspection Report: INS-O-13-03 Inspection Report - Radiological Waste Operations in Area G at Los Alamos

59

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 10, 2005 June 10, 2005 Audit Report: OAS-L-05-07 The Department of Energy's Annual Report to Congress on Management and Operating Contractor Employees in the Washington, D.C. Area June 3, 2005 Audit Report: OAS-M-05-06 Management Controls over Selected Departmental Critical Monitoring and Control Systems May 20, 2005 Audit Report: IG-0690 Contractor Post-Retirement Health Benefits at the Oak Ridge Reservation May 12, 2005 Audit Report: IG-0689 Selected Energy Efficiency and Renewable Energy Projects May 10, 2005 Audit Report: OAS-M-05-05 Management Controls over Patent and Royalty Income at Ames Laboratory May 9, 2005 Audit Report: OAS-L-05-06 Contractor-Provided Meals for Federal Employees May 3, 2005 Audit Report: IG-0688 National Nuclear Security Administration's Pit Disassembly and Conversion

60

Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2006-09-28T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hanford Site Environmental Report for Calendar Year 2004  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2003; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2005-09-29T23:59:59.000Z

62

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2012 July 30, 2012 Audit Report: OAS-FS-12-10 Southwestern Federal Power System's Fiscal Year 2010 Financial Statement Audit July 20, 2012 Audit Report: OAS-L-12-07 The Global Threat Reduction Initiative's Molybdenum-99 Program July 20, 2012 Audit Report: OAS-RA-L-12-06 The Department of Energy's American Recovery and Reinvestment Act - Missouri State Energy Program July 20, 2012 Audit Report: OAS-L-12-08 Y-12 National Security Complex's Waste Diversion Efforts July 20, 2012 Audit Report: OAS-L-12-06 Oak Ridge National Laboratory's Waste Diversion Efforts July 10, 2012 Audit Report: OAS-RA-L-12-05 Follow-up on the Department of Energy's Implementation of the Advanced Batteries and Hybrid Components Program Funded under the American Recovery and Reinvestment Act July 2, 2012

63

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 17, 2013 January 17, 2013 Examination Report: OAS-RA-13-06 Montgomery County Department of Housing and Community Affairs - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 January 17, 2013 Examination Report: OAS-RA-13-05 Prince George's County Department of Housing and Community Development - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 January 16, 2013 Audit Report: OAS-L-13-05 The Department of Energy's International Offices and Foreign Assignments January 15, 2013 Audit Report: OAS-FS-13-09 Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit January 11, 2013 Audit Report: OAS-L-13-04

64

Environmental monitoring report for Calendar Year 1986  

Science Conference Proceedings (OSTI)

The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

Stencel, J.R.

1987-05-01T23:59:59.000Z

65

Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada, Calendar Year 2000  

SciTech Connect

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eight landfill sites, Corrective Action Sites (CASS), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the locations of the landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan contained, in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range. Nevada, report number DOE/NV--283. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. Post-closure monitoring consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000, and November 20, 2000. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist and photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

66

Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complexes Tonopah Test Range, Nevada Calendar Year 2001  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV--283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-02-01T23:59:59.000Z

67

Weldon Spring Site Environmental Report for calendar year 1994  

SciTech Connect

This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

NONE

1995-05-01T23:59:59.000Z

68

Event Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar Add EETD Calendar to Google Calendar Year Month Week Day Prev August 2013 Next Sunday Monday Tuesday Wednesday Thursday Friday Saturday 31 1 2 3 32 4 5 6 12:00pm -...

69

Computer-aided engineering annual report for calendar year 1989  

Science Conference Proceedings (OSTI)

During calendar year 1989, EG G Idaho completed the initial procurement and implementation of a major new Computer-Aided Engineering (CAE) system. Seventy new workstations and associated engineering applications were installed over 100 personal computers (PCs) were integrated into the environment, and communications links to the IBM mainframes and the Cray supercomputer were established. The system achieves integration through sophisticated data communications and application interfaces that allow data sharing across the entire environment. Applications available on the system facilitate engineering relate to full three-dimensional (3-D) piping, heating/ventilating/air conditioning (HAVC), structural and steel design, solids modeling and analysis, desktop publishing, design and drafting, and include automated links to various analysis codes on the Cray supercomputer. The system also provides commonly used engineering tools such as spreadsheets, language compilers, terminal emulation, and file transfer facilities. Although difficult to quantify, recent information has shown that projected annual productivity improvement to the Idaho National Engineering Laboratory (INEL) will be in excess of $2,000,000. This improvement will be generated in a variety of areas including improvement in the efficiency of individual users, checkplot production, data management, file transfers, plotting. design-analysis interfaces, and the benefit of full 3-D design. Current plans call for a significant expansion of the CAE system in 1990 with continued expansion through 1993. Additional workstations, system software and utilities, networking facilities and applications software will be procured and implemented. More than one hundred people will receive training on the various application packages during 1990. Efforts to extend networking throughout the INEL will be continued. 2 refs.

Brockelsby, H.C. Jr.

1990-03-01T23:59:59.000Z

70

ERRATA SHEET for Post-Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area Tonopah Test Range, Nevada, Calendar year 2001  

SciTech Connect

The fifth sentence of the first paragraph on Page 1 of the Post Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area, Tonopah Test Range, Nevada erroneously states that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on January 7, 2002. The sentence should state that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on February 22, 2002.

K. B. Campbell

2002-01-01T23:59:59.000Z

71

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada For Calendar Year 2006  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites, CAS 58-09-02, Mud Pit, and CAS 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill, and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits (5), an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action.

None

2007-06-01T23:59:59.000Z

72

Brookhaven National Laboratory site environmental report for calendar year 1990  

SciTech Connect

Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

1992-01-01T23:59:59.000Z

73

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

Science Conference Proceedings (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

74

Annual Site Environmental Report for Calendar Years 2009 to 2010  

SciTech Connect

This report presents the results of environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Years 2009-2010. The report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are released into the environment as a result of PPPL operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2009-2010. The objective of the Site Environmental Report is to document PPPL's efforts to protect the public's health and the environment through its environmental protection, safety, and health programs. __________________________________________________

Virginia Finley

2012-08-08T23:59:59.000Z

75

Post-Closure Inspection Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit [CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427, Area 3 Septic Waste Systems 2 and 6, Tonopah Test Range, Nevada, report number DOENV-56 1, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. As stated in Section 5.1 of the NDEP-approved CR, the annual Post-Closure inspection at CAU 427 consists of the following: (1) Verification of the presence of all leachfield and septic tank below-grade markers. (2) Verification that all warning signs are in-place, intact, and readable. (3) Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on May 16, 2001, and November 6, 2001. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C.

K. B. Campbell

2002-01-01T23:59:59.000Z

76

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

77

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2000  

Science Conference Proceedings (OSTI)

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls Site, Niskayuna, New York and the Kesselring Site, West Milton, New York and site closure activities at the S1C Site, Windsor, Connecticut, continued to have no adverse effect on human health and the quality of the environment during calendar year 2000. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations. Monitoring programs at the S1C Site were reduced in scope during calendar year 2000 due to completion of site dismantlement activities during 1999.

None

2001-12-01T23:59:59.000Z

78

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2011-03-30T23:59:59.000Z

79

Site Environmental Report for Calendar Year 2001 (GJO-2002-341...  

Office of Legacy Management (LM)

to environmental activities conducted during calendar year 2001 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN,...

80

Brookhaven National Laboratory site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

The environmental monitoring program is conducted by the Environmental Protection Section of the Safety and Environmental Protection (S EP) Division to determine whether operation of BNL facilities have met the applicable environmental standards and effluent control requirements. This program includes monitoring for both radiological and nonradiological parameters. This report summarizes the data for the external radiation levels; radioactivity in air, rain, potable water, surface water, ground water, soil, vegetation, and aquatic biota; water quality, metals, organics and petroleum products in ground water, surface water and potable water. Analytical results are reviewed by the S EP staff and when required by permit conditions are transmitted to the appropriate regulatory agencies. The data were evaluated using the appropriate environmental regulatory criteria. Detailed data for the calendar year 1989 are presented. 27 figs.

Miltenberger, R.P.; Royce, B.A.; Chalasani, S.S.; Morganelli, D.; Naidu, J.R.

1990-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Hanford Site Environmental Surveillance Data Report for Calendar Year 2008  

SciTech Connect

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2009-08-11T23:59:59.000Z

82

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1999  

SciTech Connect

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the three KAPL Sites [Knolls Site, Niskayuna, New York; Kesselring Site, West Milton, New York; S1C Site, Windsor, Connecticut] during calendar year 1999 resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations.

None

2000-12-01T23:59:59.000Z

83

Hanford Site Environmental Surveillance Data Report for Calendar Year 2007  

Science Conference Proceedings (OSTI)

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2008-10-13T23:59:59.000Z

84

Annual Waste Minimization Summary Report Calendar Year 2007  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year (CY) 2007. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit (number NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO.

NSTec Environmental Management

2008-02-01T23:59:59.000Z

85

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2008-12-17T23:59:59.000Z

86

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2007-09-27T23:59:59.000Z

87

Calendar Year 2007 Program Benefits for ENERGY STAR Labeled Products  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Labeled Products ENERGY STAR Labeled Products Title Calendar Year 2007 Program Benefits for ENERGY STAR Labeled Products Publication Type Journal Article LBNL Report Number LBNL-1217E Year of Publication 2008 Authors Sanchez, Marla C., Gregory K. Homan, and Richard E. Brown Date Published 10/2008 Publisher Lawrence Berkeley National Laboratory ISBN Number LBNL-1217E Keywords Enduse, Energy End-Use Forecasting, EUF Abstract ENERGY STAR is a voluntary energy efficiency-labeling program operated jointly by the United States Department of Energy and the United States Environmental Protection Agency (US EPA). Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products. ENERGY STAR's central role in the development of regional, national, and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with committed stakeholders. Through 2007, the program saved 7.1 Quads of primary energy and avoided 128 MtC equivalent. The forecast shows that the program is expected to save 21.2 Quads of primary energy and avoid 375 MtC equivalent over the period 2008-2015. The sensitivity analysis bounds the best estimate of carbon avoided between 84 MtC and 172 MtC (1993 to 2007) and between 243 MtC and 519 MtC (2008 to 2015).

88

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: #2; CAU 400: Bomblet Pit and Five Points Landfill (TTR) #2; CAU 404: Roller Coaster Lagoons and Trench (TTR) #2; CAU 407: Roller Coaster RadSafe Area (TTR) #2; CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) #2; CAU 424: Area 3 Landfill Complexes (TTR) #2; CAU 426: Cactus Spring Waste Trenches (TTR) #2; CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) #2; CAU 453: Area 9 UXO Landfill (TTR) #2; CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) #2; CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2009-03-19T23:59:59.000Z

89

Argonne National Laboratory site environmental report for calendar year 2007.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2007. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.; ESH /QA Oversight

2008-09-09T23:59:59.000Z

90

Argonne National Laboratory site enviromental report for calendar year 2008.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2008. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.

2009-09-02T23:59:59.000Z

91

Argonne National Laboratory site environmental report for calendar year 2004.  

SciTech Connect

This report discusses the accomplishments of the environmental protection program at Argonne National Laboratory (ANL) for calendar year 2004. The status of ANL environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of ANL operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the ANL site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and ANL effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, ANL, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Kolzow, R. G.

2005-09-02T23:59:59.000Z

92

Argonne National Laboratory site environmental report for calendar year 2006.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2006. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; ESH /QA Oversight

2007-09-13T23:59:59.000Z

93

Hanford Facility Annual Dangerous Waste Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

Hanford CY 2002 dangerous waste generation and management forms. The Hanford Facility Annual Dangerous Waste Report (ADWR) is prepared to meet the requirements of Washington Administrative Code Sections 173-303-220, Generator Reporting, and 173-303-390, Facility Reporting. In addition, the ADWR is required to meet Hanford Facility RCRA Permit Condition I.E.22, Annual Reporting. The ADWR provides summary information on dangerous waste generation and management activities for the Calendar Year for the Hanford Facility EPA ID number assigned to the Department of Energy for RCRA regulated waste, as well as Washington State only designated waste and radioactive mixed waste. The Solid Waste Information and Tracking System (SWITS) database is utilized to collect and compile the large array of data needed for preparation of this report. Information includes details of waste generated on the Hanford Facility, waste generated offsite and sent to Hanford for management, and other waste management activities conducted at Hanford, including treatment, storage, and disposal. Report details consist of waste descriptions and weights, waste codes and designations, and waste handling codes. In addition, for waste shipped to Hanford for treatment and/or disposal, information on manifest numbers, the waste transporter, the waste receiving facility, and the original waste generators are included. In addition to paper copies, electronic copies of the report are also transmitted to the regulatory agency.

FREEMAN, D.A.

2003-02-01T23:59:59.000Z

94

Sequim Site Radionuclide Air Emissions Report for Calendar Year 2012  

SciTech Connect

This report is prepared to document compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and ashington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. This report meets the calendar year 2012 Sequim Site annual reporting requirement for its operations as a privately-owned facility as well as its federally-contracted status that began in October 2012. Compliance is indicated by comparing the estimated dose to the maximally exposed individual (MEI) with the 10 mrem/yr Environmental Protection Agency (EPA) standard. The MSL contains only sources classified as fugitive emissions. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The dose to the Sequim Site MEI due to routine operations in 2012 was 9E-06 mrem (9E-08 mSv). No non-routine emissions occurred in 2012. The MSL is in compliance with the federal and state 10 mrem/yr standard.

Snyder, Sandra F.; Barnett, J. M.; Gervais, Todd L.

2013-04-01T23:59:59.000Z

95

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2005-09-30T23:59:59.000Z

96

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA FOR CALENDAR YEAR 2005  

SciTech Connect

This post-closure inspection report includes the results of inspections, maintenance and repair activities, and conclusions and recommendations for Calendar Year 2005 for nine Corrective Action Units located on the Tonopah Test Range , Nevada.

NONE

2006-06-01T23:59:59.000Z

97

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003  

Science Conference Proceedings (OSTI)

This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-04-01T23:59:59.000Z

98

Summary of the Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This small booklet provides highlights of the environmental monitoring at the Hanford Site during 2005. It is a summary of the information contained in the larger report: Hanford Site Environmental Monitoring for Calendar Year 2005.

Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

2006-09-28T23:59:59.000Z

99

Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011  

Science Conference Proceedings (OSTI)

The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Stegen, Amanda; Barnett, J. M.; Su-Coker, Jennifer; Moon, Thomas W.; Ballinger, Marcel Y.; Dirkes, Roger L.; Opitz, Brian E.

2012-09-01T23:59:59.000Z

100

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012  

Science Conference Proceedings (OSTI)

The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Ballinger, Marcel Y.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Barnett, J. M.; Su-Coker, Jennifer; Stegen, Amanda; Moon, Thomas W.; Becker, James M.; Raney, Elizabeth A.; Chamness, Michele A.; Mendez, Keith M.

2013-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Environmental Science and Research Foundation annual technical report: Calendar year 1996  

SciTech Connect

This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed.

Morris, R.C.; Blew, R.D. [eds.

1997-07-01T23:59:59.000Z

102

Hanford Site Rare Plant Monitoring Report for Calendar Year 2012  

SciTech Connect

Two patches of Columbian yellowcress on the Hanford Reach were visited in both 2011 and 2012 to compare ramet counts between years: near Allerd Pumphouse (Rkm 615.4) and near White Bluffs Boat Launch (Rkm 593.3) (Figure 3). In 2012, the population near Allerd Pumphouse had 45 ramets present within a 5x3 m area. At the same population in 2011, there were 60 ramets. In 2012, the population near White Bluffs Boat Launch had 105 ramets in a 2x2 m area. At the same population in 2011, there were 100 ramets. This data shows that while annual variability does exist, ramet counts were relatively similar from 2011 to 2012. This is likely due to the similar flow regimes of 2011 and 2012, which both had above average snowpack, high flows, and extended spring flooding seasons. A total of 19.6 miles (31.5 km) of the Hanford shoreline were surveyed in 2012, with ten patches identified and approximately 1,250 ramets counted. It is not known how many individual plants this count represents due to the rhizomatous nature of the species. Two of these sites were identified previously in the WNHP database, and the remaining eight were newly identified locations. Eleven of the ramets had flowers and/or buds in the patches located during 2012, but no fruits were found

Salstrom, D; Easterly, R; Lindsey, Cole T.; Nugent, John J.

2013-03-21T23:59:59.000Z

103

Calendar -- Fernald Preserve Calendar  

Office of Legacy Management (LM)

> Visitors Center > Fernald Preserve > Visitors Center > Fernald Preserve Calendar Fernald Preserve Calendar The Fernald Preserve offers scheduled events and programs in addition to the trails and wildlife viewing areas that are open seven days a week from 7:00 a.m. to dusk. Special hikes are routinely held at the site, as well as educational programs and unique events such as stargazing. Unless otherwise noted on the calendar, all events begin and end at the Visitors Center and don't require any special equipment or knowledge. Please dress appropriately for the weather and activity. Programs are subject to change. Call (513) 648-6000 or e-mail us for additional information. Directions here. previous daynext daytodaySelect date >> S M T W T F S 1 2 3 4

104

Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1999 Emission Report  

Science Conference Proceedings (OSTI)

This report presents the 1999 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradionuclide emissions estimates for stationary sources.

Zohner, S.K.

2000-05-30T23:59:59.000Z

105

Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1998 Emissions Report  

SciTech Connect

This report presents the 1998 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradiological emissions estimates for stationary sources.

S. K. Zohner

1999-10-01T23:59:59.000Z

106

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

107

Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

108

Sandia National Laboratories, California pollution prevention annual program report for calendar year 2005.  

Science Conference Proceedings (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the ''SNL/CA Environmental Management System Program Manual''. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA.

Farren, Laurie J. (Sandia National Laboratories, Livermore, CA)

2005-07-01T23:59:59.000Z

109

Environmental monitoring at Ames Laboratory: calendar year 1980  

SciTech Connect

The results and conclusions from the Ames Laboratory environmental monitoring programs for the Ames Laboratory Research Reactor (ALRR) and other Laboratory facilities are presented. The major areas of radiological monitoring were ALRR effluent air, environmental air, effluent water and environmental water. A summary of the radioactivity found in the environment is presented. The ALRR ceased operation on December 1, 1977. Decommissioning activities began January 3, 1978, and are scheduled for completion October 1, 1981. Analysis of air samples collected at the ALRR on-site station showed no radioactivity that could be attributed to ALRR operations. The radiosotope of significance in the ALRR stack effluent was tritium (H-3). The yearly individual dose from H-3 at the exclusion fence was estimated to be 0.016 mRem and the estimated dose to the entire population within an 80 Km (50 mile) radius of the ALRR was 26.6 man-Rem. These values are 0.0032% and 0.026%, respectively, of the doses derived from the concentration guides. On September 1, 1978, the ALRR site was connected to the City of Ames sanitary sewage system. All liquids (except building foundation and roof water) from the ALRR complex are now discharged to the sewage system negating the requirement for monitoring chemical constituents of effluent and environmental waters. In the radioactive liquid waste released to the City of Ames sewage system from the ALRR complex, H-3 was the predominant isotope. After dilution with other waste water from the ALRR complex, the potential dose was not more than 0.68% of the dose derived from the concentration guide. Building foundation and roof water are discharged to a drainage gulch on site.

Voss, M.D.

1981-04-01T23:59:59.000Z

110

Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

Bechtel Nevada

2005-03-01T23:59:59.000Z

111

Annual site environmental report for calendar year 1996  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program. Western markets power from 56 hydroelectric power generating plants in its service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The significant environmental projects and issues Western was involved with in 1996 are discussed in this report.

NONE

1996-12-31T23:59:59.000Z

112

Waste Isolation Pilot Plant site environmental report for calendar year 1994  

SciTech Connect

US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

NONE

1995-06-01T23:59:59.000Z

113

Hanford Site Environmental Report for Calendar Year 2003  

SciTech Connect

This report is published each year by DOE to summarize environmental data and information, describe environmental management performance, demonstrate the status of compliance with environmental regulations, and highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2004-09-01T23:59:59.000Z

114

Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York  

SciTech Connect

IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs.

1990-05-01T23:59:59.000Z

115

Annual site environmental report for calendar year 1986  

DOE Green Energy (OSTI)

The Western Area Power Administration has established an effective formal environmental protection, auditing, and monitoring program which has been in effect since 1978. This annual site environmental report discusses the significant environmental projects and issues Western was involved with in 1986, and it is written to demonstrate the nature and effectiveness of the environmental protection program. Western has numerous facilities located in 15 states. This report was written to address all the facilities.

NONE

1987-05-01T23:59:59.000Z

116

Annual site environmental report for calendar year 1988  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1988-12-31T23:59:59.000Z

117

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002  

Science Conference Proceedings (OSTI)

This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

R. B. Jackson

2003-08-01T23:59:59.000Z

118

National Emission Standards for Hazardous Air Pollutants Calendar Year 2001  

DOE Green Energy (OSTI)

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) as the site for nuclear weapons testing, now limited to readiness activities, experiments in support of the national Stockpile Stewardship Program, and the activities listed below. Located in Nye County, Nevada, the site's southeast corner is about 88 km (55 mi) northwest of the major population center, Las Vegas, Nevada. The NTS covers about 3,561 km2 (1,375 mi2), an area larger than Rhode Island. Its size is 46 to 56 km (28 to 35 mi) east to west and from 64 to 88 km (40 to 55 mi) north to south. The NTS is surrounded, except on the south side, by public exclusion areas (Nellis Air Force Range [NAFR]) that provide another 24 to 104 km (15 to 65 mi) between the NTS and public lands (Figure 1.0). The NTS is characterized by desert valley and Great Basin mountain topography, with a climate, flora, and fauna typical of the southwest deserts. Population density within 150 km (93 mi) of the NTS is only about 0.2 persons per square kilometer, excluding the Las Vegas area. Restricted access, low population density in the surrounding area, and extended wind transport times are advantageous factors for the activities conducted at the NTS. Surface waters are scarce on the NTS, and slow-moving groundwater is present hundreds to thousands of feet below the land surface. The sources of radionuclides include current and previous activities conducted on the NTS (Figure 2.0). The NTS was the primary location for testing of nuclear explosives in the Continental U.S. between 1951 and 1992. Historical testing above or at ground surface has included (1) atmospheric testing in the 1950s and early 1960s, (2) earth-cratering experiments, and (3) open-air nuclear reactor and rocket engine testing. Since the mid-1950s, testing of nuclear explosive devices has occurred underground in drilled vertical holes or in mined tunnels (DOE 1996a). No such tests have been conducted since September 23, 1992 (DOE 2000). Limited non-nuclear testing includes spills of hazardous materials at the Hazardous Materials Spill Center, private technology development, aerospace and demilitarization activities, and site remediating activities. Processing of radioactive materials is limited to laboratory analyses, and handling is restricted to transport, storage, and assembly of nuclear explosive devices and operation of radioactive waste management sites (RWMSs) for low-level radioactive and mixed waste (DOE 1996a). Monitoring and evaluation of the various activities conducted onsite indicate that the potential sources of offsite radiation exposure in CY 2001 were releases from (1) evaporation of tritiated water (HTO) from containment ponds that receive drainage water from E Tunnel in Area 12 and from discharges of two wells (Well U-3cn PS No. 2 and Well ER-20-5 No.3) into lined ponds, (2) onsite radio analytical laboratories, (3) the Area 5 RWMS (RWMS-5) facility, and (4) diffuse sources of tritium and re- suspension of plutonium and americium. The following sections present a general description of the present sources on the NTS and at the North Las Vegas Facility.

Y. E. Townsend

2002-06-01T23:59:59.000Z

119

Pinellas Plant annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

120

Brookhaven National Laboratory site report for calendar year 1988  

SciTech Connect

Brookhaven National Laboratory (BNL) is managed by Associated Universities Inc. (AUI). AUI was formed in 1946 by a group of nine universities whose purpose was to create and manage a laboratory in the Northeast in order to advance scientific research in areas of interest to universities, industry, and government. On January 31, 1947, the contract for BNL was approved by the Manhattan District of the Army Corps of Engineers and BNL was established on the former Camp Upton army camp. 54 refs., 21 figs., 78 tabs.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

1989-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.``

NONE

1994-12-31T23:59:59.000Z

122

Annual site environmental report for calendar year 1989  

DOE Green Energy (OSTI)

The Western Area Power Administration has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved within 1989 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in fifteen states, this report was written to address the environmental activities in all of the facilities as one ``site.``

NONE

1996-03-01T23:59:59.000Z

123

Annual site environmental report for calendar year 1995  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.

NONE

1995-12-31T23:59:59.000Z

124

Brookhaven National Laboratory site environmental report for calendar year 1995  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

1996-12-01T23:59:59.000Z

125

Annual site environmental report for calendar year 1991  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1991-12-31T23:59:59.000Z

126

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2MHILL B& W West Valley, LLC

2011-09-28T23:59:59.000Z

127

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDPs environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2009-09-24T23:59:59.000Z

128

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011  

Science Conference Proceedings (OSTI)

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2M HILL B& W West Valley, LLC

2012-09-27T23:59:59.000Z

129

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Rendall, John D. [CH2M HILL B& W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL B& W West Valley, LLC (CHBWV)

2013-09-19T23:59:59.000Z

130

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOEs effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS Corporation

2010-09-17T23:59:59.000Z

131

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

132

Annual site environmental report for calendar year 1997  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. Because Western has over 400 facilities located in 15 states, this report addresses the environmental activities in all the facilities as one site. In March, 1996, Western established a team representing each of the four Regional Offices, the CRSP Customer Service Center and the Corporate Service Office to develop an Environmental Management System based on the guidelines in ISO 14001. The significant environmental projects and issues Western was involved with in 1997 are discussed in this annual site environmental report. This report is written to show the nature and effectiveness of the environmental protection program.

NONE

1997-12-31T23:59:59.000Z

133

Annual Site Environmental Report of the Lawrence Berkeley Laboratory, Calendar year 1992  

SciTech Connect

This Annual Site Environmental Report summarizes LBL environmental activities in calendar year (CY) 1992. The purpose of this Report is to present summary environmental information in order to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program.``

Balgobin, D.A.; Javandel, I.; Pauer, R.O.; Schleimer, G.E.; Thorson, P.A. [eds.

1993-05-01T23:59:59.000Z

134

National Emission Standards for Hazardous Air PollutantsCalendar Year 2010 INL Report for Radionuclides (2011)  

SciTech Connect

This report documents the calendar Year 2010 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.'

Mark Verdoorn; Tom Haney

2011-06-01T23:59:59.000Z

135

Review of power planning in the Pacific Northwest: calendar year 1980  

Science Conference Proceedings (OSTI)

Many of the activities that occurred in the electric power industry in the Pacific Northwest during calendar year 1980 are reviewed in this publication. These include: significant power planning related events, activities, and studies; passage of the Pacific Northwest Electric Power Planning and Conservation Act on December 5, 1980, the Act becoming P.L. 95-501; the development of alternative and renewable energy resources; home weatherization programs; processing of preliminary permits for development of small hydro; investigation of geothermal resources; and nuclear power development setbacks as voters in the states of Montana, Oregon, and Washington passed initiatives regarding storage of nuclear waste and siting of nuclear powerplants. Information is included on: utility load estimates through the year 2020; the resources existing, under construction, and feasible for development in meeting the forecast loads; a large number of small hydro projects which are in various stages of the study and/or licensing process; and a comparison of loads and resources giving the overall picture of the power situation in the Pacific Northwest. It is concluded that deficits in firm energy occur in all of the next 10 years, under critical hydro conditions. Small hydro, wind, and biomass generation, along with an aggressive mandatory energy conservation program could eliminate the deficit. However, the assured cost-effective potential realizable from these resources is unknown. Finally, the activities of the Power Planning Committee during the year are discussed, with a list of Committee publications included. A map titled Electric Power Plants in the Pacific Northwest and Adjacent Areas is included.

Not Available

1981-04-01T23:59:59.000Z

136

Pinellas Plant Annual Site Environmental Report for calendar year 1994  

Science Conference Proceedings (OSTI)

This report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant, in Pinellas County, Florida for 1994. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1994. As a result of the end of Department of Energy Defense Programs mission production on September 30, 1994, considerable changes at the Pinellas Plant occurred. These changes, which included transitioning the plant toward alternate use in support of economic development and safe shutdown, both increased and heightened Environmental, Safety and Health responsibilities. In December 1994, the Department of Energy announced it had reached an agreement to sell the Pinellas Plant to the Pinellas County Industry Council in March 1995. The plant is being leased back by the Department of Energy through September 1997 to complete safe shutdown, reconfiguration, transfer of equipment to other Department of Energy production facilities, and transition to commercial ventures. Permit modifications and transfers will be completed during 1995 to reflect the new ownership by the Pinellas County Industry Council and to include new tenants as needed.

NONE

1995-06-01T23:59:59.000Z

137

Annual site environmental report for calendar year 1991  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in 15 states, this report was written to address the environmental activities in all of the facilities as one ``site``. In 1991, Western provided power to 615 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1991-12-31T23:59:59.000Z

138

Annual site environmental report for calendar year 1992  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1992 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy (DOE) Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.`` In 1992, Western provided power to 612 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, Federal and State agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provided service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of more than 16,450 miles of transmission lines, 268 substations, 51 hydroelectric power plants, and a coal-fired power plant.

1992-12-31T23:59:59.000Z

139

Annual site environmental report for calendar year 1993  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1993 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 States, this report addresses the environmental activities in all the facilities as one ``site``. In 1993, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1993-12-31T23:59:59.000Z

140

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site``. In 1994, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of nearly 17,000 miles of transmission lines, 271 substations, 55 hydroelectric power stations, and a coal-fired power plant.

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Brookhaven National Laboratory site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A. [eds.

1994-05-01T23:59:59.000Z

142

Calendar Year 2009 Program Benefits for ENERGY STAR Labeled Products  

Science Conference Proceedings (OSTI)

ENERGY STAR is a voluntary energy efficiency labeling program operated jointly by the Environmental Protection Agency (US EPA) and the U.S. Department of Energy (US DOE), designed to identify and promote energy-efficient products, buildings and practices. Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products, and currently labels more than thirty products, spanning office equipment, heating, cooling and ventilation equipment, commercial and residential lighting, home electronics, and major appliances. ENERGY STAR's central role in the development of regional, national and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with stakeholders. This report presents savings estimates from the use ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2009, annual forecasts for 2010 and 2011, and cumulative savings estimates for the period 1993 through 2009 and cumulative forecasts for the period 2010 through 2015. Through 2009 the program saved 9.5 Quads of primary energy and avoided the equivalent of 170 million metric tons carbon (MMTC). The forecast for the period 2009-2015 is 11.5 Quads or primary energy saved and 202 MMTC emissions avoided. The sensitivity analysis bounds the best estimate of carbon avoided between 110 MMTC and 231 MMTC (1993 to 2009) and between 130 MMTC and 285 MMTC (2010 to 2015).

Homan, Gregory K; Sanchez, Marla C.; Brown, Richard E.

2010-11-15T23:59:59.000Z

143

Southwestern Power Administration site environmental report for calendar year 1993  

DOE Green Energy (OSTI)

During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy`s Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office.

Not Available

1994-06-01T23:59:59.000Z

144

Pantex Plant site environmental report for calendar year 1989  

SciTech Connect

This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 {mu}Ci of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs.

Not Available

1990-05-01T23:59:59.000Z

145

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001  

Science Conference Proceedings (OSTI)

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000.

NONE

2002-12-31T23:59:59.000Z

146

Strategic Petroleum Reserve annual report for calendar year 1998  

SciTech Connect

The Strategic Petroleum Reserve was established in 1975 as an emergency response to the 1973 Arab oil embargo. It is authorized by the Energy Policy and Conservation Act (EPCA), and by the comprehensive energy plans of all Administrations since 1975, in recognition of the long-term dependence of the US on imported crude oil and petroleum products. Section 165 of EPCA requires the Secretary of Energy to submit an Annual Report to the President and the Congress. On May 13, 1998, the Department published a Statement of Administration Policy which reaffirmed its commitment to maintain a Government-owned and controlled, centrally located Strategic Petroleum Reserve of crude oil. The Reserve is to be used solely for responding to the types of severe oil supply interruptions presently contemplated in EPCA. Over the past twenty years, the Reserve has grown as large as 592 million barrels--a peak reached in 1994. From 1994 to 1996, nearly 28 million barrels were sold to raise revenues for the U S Treasury. As of December 31, 1998, the crude oil inventory was 561,108,127 barrels which equated to 60 days of net oil imports during 1998. The US now relies on a combination of both the Reserve and private stocks to meet its oil storage obligations to the International Energy Agency.

1998-12-31T23:59:59.000Z

147

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

NSTec Environmental Restoration

2012-02-21T23:59:59.000Z

148

Calendar Year 2008 Program Benefits for ENERGY STAR Labeled Products  

SciTech Connect

This paper presents current and projected savings for ENERGY STAR labeled products, and details the status of the model as implemented in the September 2009 spreadsheets. ENERGY STAR is a voluntary energy efficiency labeling program operated jointly by the Environmental Protection Agency (US EPA) and the U.S. Department of Energy (US DOE), designed to identify and promote energy-efficient products, buildings and practices. Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products, and currently labels more than thirty products, spanning office equipment, heating, cooling and ventilation equipment, commercial and residential lighting, home electronics, and major appliances. ENERGY STAR's central role in the development of regional, national and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with stakeholders. This report presents savings estimates for ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2008, annual forecasts for 2009 and 2010, and cumulative savings estimates for the period 1993 through 2008 and cumulative forecasts for the period 2009 through 2015. Through 2008 the program saved 8.8 Quads of primary energy and avoided the equivalent of 158 metric tones carbon (MtC). The forecast for the period 2009-2015 is 18.1 Quads or primary energy saved and 316 MtC emissions avoided. The sensitivity analysis bounds the best estimate of carbon avoided between 104 MtC and 213 MtC (1993 to 2008) and between 206 MtC and 444 MtC (2009 to 2015). In this report we address the following questions for ENERGY STAR labeled products: (1) How are ENERGY STAR impacts quantified; (2) What are the ENERGY STAR achievements; and (3) What are the limitations to our method?

Homan, GregoryK; Sanchez, Marla; Brown, RichardE; Lai, Judy

2010-08-24T23:59:59.000Z

149

Calendar Year 2008 Program Benefits for ENERGY STAR Labeled Products  

SciTech Connect

This paper presents current and projected savings for ENERGY STAR labeled products, and details the status of the model as implemented in the September 2009 spreadsheets. ENERGY STAR is a voluntary energy efficiency labeling program operated jointly by the Environmental Protection Agency (US EPA) and the U.S. Department of Energy (US DOE), designed to identify and promote energy-efficient products, buildings and practices. Since the program inception in 1992, ENERGY STAR has become a leading international brand for energy efficient products, and currently labels more than thirty products, spanning office equipment, heating, cooling and ventilation equipment, commercial and residential lighting, home electronics, and major appliances. ENERGY STAR's central role in the development of regional, national and international energy programs necessitates an open process whereby its program achievements to date as well as projected future savings are shared with stakeholders. This report presents savings estimates for ENERGY STAR labeled products. We present estimates of energy, dollar, and carbon savings achieved by the program in the year 2008, annual forecasts for 2009 and 2010, and cumulative savings estimates for the period 1993 through 2008 and cumulative forecasts for the period 2009 through 2015. Through 2008 the program saved 8.8 Quads of primary energy and avoided the equivalent of 158 metric tones carbon (MtC). The forecast for the period 2009-2015 is 18.1 Quads or primary energy saved and 316 MtC emissions avoided. The sensitivity analysis bounds the best estimate of carbon avoided between 104 MtC and 213 MtC (1993 to 2008) and between 206 MtC and 444 MtC (2009 to 2015). In this report we address the following questions for ENERGY STAR labeled products: (1) How are ENERGY STAR impacts quantified; (2) What are the ENERGY STAR achievements; and (3) What are the limitations to our method?

Homan, GregoryK; Sanchez, Marla; Brown, RichardE; Lai, Judy

2010-08-24T23:59:59.000Z

150

BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public or to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

NAIDU,J.R.; ROYCE,B.A.

1995-05-01T23:59:59.000Z

151

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007  

SciTech Connect

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

NSTec Environmental Restoration

2008-06-01T23:59:59.000Z

152

National Emission Standards for Hazardous Air PollutantsCalendar Year 2011 INL Report for Radionuclides (2012)  

SciTech Connect

This report documents the calendar year 2011 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.' The effective dose equivalent to the maximally exposed individual member of the public was 4.58E-02 mrem per year, 0.46 percent of the 10 mrem standard.

Mark Verdoorn; Tom Haney

2012-06-01T23:59:59.000Z

153

Calendar Year 2001 Annual Site Environmental Report Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Sandia Corporation (a subsidiary of Lockheed Martin Corporation through its contract with the U.S. Department of Energy [DOE]), National Nuclear Security Administration (NNSA) operates the Tonopah Test Range (TTR) in Nevada. Westinghouse Government Service, TTR's operations and maintenance contractor, performs most all environmental program functions. This Annual Site Environmental Report (ASER), which is published to inform the public about environmental conditions at TTR, describes environmental protection programs and summarizes the compliance status with major environmental laws and regulations during Calendar Year (CY) 2001.

VIGIL, FRANCINE S.

2002-09-01T23:59:59.000Z

154

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

SciTech Connect

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

155

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

Science Conference Proceedings (OSTI)

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

156

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

BECHTEL NEVADA

2005-04-01T23:59:59.000Z

157

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Report Environmental Report For Calendar Year 2002 U . S . D e p a r t m e n t o f E n e r g y * O f f i c e o f F o s s i l E n e r g y N a t i o n a l E n e r g y T e c h n o l o g y L a b o r a t o r y DOE/NETL-2004/1201 2 DOE/NETL-2004/1201 The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002 October 2003 U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia Pittsburgh, Pennsylvania Tulsa, Oklahoma Fairbanks, Alaska NETL Customer Service Line: (800) 553-7681 NETL Homepage: www.netl.doe.gov 3 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or

158

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

159

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

Science Conference Proceedings (OSTI)

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

160

A Comparative Study of Year-Round and Traditional Calendar Schools in Chicago.  

E-Print Network (OSTI)

?? Restructuring the school calendar has been investigated by school districts as a possible way to increase student achievement in order to meet the standards (more)

Winkelmann, Andrea Therese

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

Science Conference Proceedings (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

162

Summary of the Hanford Site Environmental Report for Calendar Year 2008  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

163

Summary of the Hanford Site Environmental Report for Calendar Year 2009  

Science Conference Proceedings (OSTI)

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2009." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2010-09-30T23:59:59.000Z

164

Summary of the Hanford Site Environmental Report for Calendar Year 2007  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2007." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the sites compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2008-09-10T23:59:59.000Z

165

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

166

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

167

Search for high frequency gravitational-wave bursts in the first calendar year of LIGO's fifth science run  

E-Print Network (OSTI)

We present an all-sky search for gravitational waves in the frequency range 1 to 6 kHz during the first calendar year of LIGOs fifth science run. This is the first untriggered LIGO burst analysis to be conducted above 3 ...

Zucker, Michael E.

168

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2004  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), ''Notice of Intent and Emissions Inventory Requirements''. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. This Title V Operating Permit (Permit No. P-100) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2004. LANL's 2004 emissions are well below the emission limits in the Title V Operating Permit.

M. Stockton

2005-10-01T23:59:59.000Z

169

Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratorys potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANLs 2008 emissions are well below the emission limits in the Title V Operating Permit.

Ecology and Air Quality Group

2009-10-01T23:59:59.000Z

170

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2009  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2009. LANL's 2009 emissions are well below the emission limits in the Title V Operating Permit.

Environmental Stewardship Group

2010-10-01T23:59:59.000Z

171

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2006  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. Modification Number 1 to this Title V Operating Permit was issued on June 15, 2006 (Permit No P-100M1) and includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2006. LANL's 2006 emissions are well below the emission limits in the Title V Operating Permit.

Ecology and Air Quality Group

2007-09-28T23:59:59.000Z

172

Grand Junction Projects Office site environmental report for calendar year 1992  

SciTech Connect

This report presents information pertaining to environmental activities conducted during calendar year 1992 at the US Department of Energy Grand Junction Projects Office (DOE-GJPO) facility in Colorado. Environmental activities conducted at the GJPO facility during 1992 included those associated with environmental compliance, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. Four phases of the on-site Grand Junction Projects Office Remedial Action Project were completed in 1992. Remediation activities, which included the removal of 161,589 tons of uranium-mill-tailings-contaminated material from the facility, were conducted in compliance with all applicable permits. Off-site dose modeling for the GJPO was conducted to determine compliance with current National Emission Standards for Hazardous Air Pollutants, Subpart H, and applicable DOE Orders (5400.1 and 5400.5). The total off-site EDE to the public from all sources of radiation emanating from the facility (radon, air particulates, gamma) was calculated as 9 mrem/yr, which is well below the DOE dose limit of 100 mrem/yr above background. The radiological and nonradiological monitoring program at the GJPO facility included monitoring of activities that generate potentially hazardous or toxic wastes and monitoring of ambient air, surface water, and ground water.

Not Available

1993-05-01T23:59:59.000Z

173

The Idaho National Engineering Laboratory Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The results of the various monitoring programs for 1992 indicate that most radioactivity from the INEL operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEL Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. The first section of the report summarizes INEL activities related to compliance with environmental regulations and laws for Calendar Year 1992 and January 1 through April 1, 1993. The major portion of the report summarizes results of the RESL environmental surveillance program, which includes the collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations, offsite boundary, and distant locations. The report also compares and evaluates the sample results to appropriate Federal regulations and standards and discusses implications, if any. The USGS ground-water monitoring program is briefly summarized, and data from USGS reports are included in maps showing the spread of contaminants. Effluent monitoring and nonradiological drinking water monitoring performed by INEL contractors are discussed briefly, and data are summarized in tables.

Hoff, D.L.; Mitchell, R.G.; Moore, R.; Bingham, L.

1993-06-01T23:59:59.000Z

174

Calendar Year 2004 annual site environmental report : Tonopah Test Range, Nevada & Kauai Test Facility, Hawaii.  

Science Conference Proceedings (OSTI)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).

Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn; Koss, Susan I.; Salinas, Stephanie A.

2005-09-01T23:59:59.000Z

175

Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE`s Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957.

1994-06-01T23:59:59.000Z

176

Colonie Interim Storage Site environmental surveillance report for calendar year 1993  

SciTech Connect

This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP).

1994-06-01T23:59:59.000Z

177

Annual report to the President and the Congress on the State Energy Conservation Program for Calendar Year 1984  

Science Conference Proceedings (OSTI)

The Annual Report to the President and the Congress on the State Energy Conservation Program (SECP) for Calendar Year 1984 is required to be prepared and transmitted annually by section 365 (c) of the Energy Policy and Conservation Act (EPCA), Public Law 94-163, 42 U.S.C. 6325(c). This is the ninth annual report and discusses the activities in the State Energy Conservation Program from December 1983 through December 1984.

Not Available

1985-08-01T23:59:59.000Z

178

Annual Waste Minimization Summary Report, Calendar Year 2010, U.S. Environmental Protection Agency Identification No. NV3890090001  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security TechnoIogies, LLC, for the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2010. The NNSA/NSO Pollution Prevention Program establishes a process to reduce the volume and toxicity of waste generated by NNSA/NSO activities and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment.

Haworth, D.M.

2011-01-30T23:59:59.000Z

179

National Emission Standards for Hazardous Air Pollutants - Radionuclide Emissions, Calendar Year 2010  

SciTech Connect

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office operates the Nevada National Security Site (NNSS, formerly the Nevada Test Site) and North Las Vegas Facility (NLVF). From 1951 through 1992, the NNSS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NNSS activities has been monitored since the initiation of atmospheric testing. Limitation to underground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NNSS. After nuclear testing ended in 1992, NNSS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium are also emitted to air at the NLVF, an NNSS support complex in North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2010a) limits the release of radioactivity from a U.S. Department of Energy (DOE) facility to that which would cause 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation unrelated to NNSS activities. Unrelated doses could come from naturally occurring radioactive elements, from sources such as medically or commercially used radionuclides, or from sources outside of the United States, such as those from the damaged Fukushima nuclear power plant in Japan. Because this report is intended to discuss radioactive air emissions during calendar year 2010, data on radionuclides in air from the 2011 Fukushima nuclear power plant releases are not presented but will be included in the report for calendar year 2011. The NNSS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations (U.S. Environmental Protection Agency [EPA] and DOE, 1995). This method was approved by the EPA for use on the NNSS in 2001(EPA, 2001a) and has been the sole method used since 2005. Six locations on the NNSS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2010a). For multiple radionuclides, compliance is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2010, the potential dose from radiological emissions to air, resulting from both current and past NNSS activities, at onsite compliance monitoring stations was well below the 10 mrem/yr dose limit. Air sampling data collected at all air monitoring stations had average concentrations of radioactivity that were a fraction of the CL values. Concentrations ranged from less than 1 percent to a maximum of 17 percent of the allowed NESHAP limit. Because the nearest member of the public resides about 20 kilometers from potential release points on the NNSS, dose to the public would be only a small fraction of that measured on the NNSS. The potential dose to the public from NLVF emissions was also very low at 0.000032 mrem/yr, more than 300,000 times lower than the 10 mrem/yr limit.

NSTec Ecological and Environmental Monitoring

2011-06-30T23:59:59.000Z

180

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1996  

SciTech Connect

The results of the 1996 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the US Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1996, PPPL's Tokamak Fusion Test Reactor (TFTR) continued to conduct fusion experiments. Having set a world record on November 2, 1994, by achieving approximately 10.7 million watts of controlled fusion power during the deuterium-tritium (D-T) plasma experiments, researchers turned their attention to studying plasma science experiments, which included ''enhanced reverse shear techniques.'' Since November 1993, more than 700 tritium-fueled experiments were conducted, which generated more than 4 x 10(superscript 20) neutrons and 1.4 gigajoules of fusion energy. In 1996, the overall performance of Princeton Plasma Physics Laboratory was rated ''excellent'' by the US Department of Energy in the Laboratory Appraisal report issued in early 1997. The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents) and petroleum hydrocarbons (past leaks of releases of diesel fuel from underground storage tanks). Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report. During 1996, PPPL completed the removal of contaminated soil from two locations that were identified through the monitoring program: petroleum hydrocarbons along a drainage swale and chromium adjacent to the cooling tower.

J.D. Levine; V.L. Finley

1998-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Lanl Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL Home Phonebook Calendar Video Events from one or more calendars could not be shown here because you do not have the permission to view them. Your browser does not appear to...

182

Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 2001  

Science Conference Proceedings (OSTI)

Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2001, the Technical Area 3 steam plant was the primary source of criteria air pollutants from the Laboratory, while research and development activities were the primary source of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions from chemical use for research and development activities were also reported.

Margorie Stockton

2003-04-01T23:59:59.000Z

183

Argonne National Laboratory summary site environmental report for calendar year 2007.  

Science Conference Proceedings (OSTI)

This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited,

Golchert, N. W.

2009-05-22T23:59:59.000Z

184

Representing and visualizing calendar expressions in texts  

Science Conference Proceedings (OSTI)

Temporal expressions that refer to a part of a calendar area in terms of common calendar divisions are studied. Our claim is that such a "calendar expression" (CE) can be described by a succession of operators operating on a calendar base (CB). These ...

Delphine Battistelli; Javier Couto; Jean-Luc Minel; Sylviane R. Schwer

2008-09-01T23:59:59.000Z

185

LANL Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar Calendar LANL Calendar LANL Public Events. . . Careers» Community» Environment» 70th Anniversary» C Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the HTML-only version of this page at: https://www.google.com/calendar/htmlembed?showTitle=0&showTabs=0&showCalendars=0&height=600&wkst=1&bgcolor=%23FFFFFF&src=19q3q9uc7hhi0n1g26a2lrjtbk@group.calendar.google.com&color=%23875509&src=fgk10mie1loqb2j74p1d31f1p0@group.calendar.google.com&color=%23853104&src=q1tai2uhgddrvti32ntk5c8s0o@group.calendar.google.com&color=%232F6309&src=lanleventscalendar@gmail.com&color=%232952A3&src=2irr2g4nfn589m88hatkpa4v8k@group.calendar.google.com&color=%23253b55&src=2irr2g4nfn589m88hatkpa4v8k@group.calendar.google.com&color=%23182C57&ctz=America%2FDenver

186

Search for high frequency gravitational-wave bursts in the first calendar year of LIGO's fifth science run  

Science Conference Proceedings (OSTI)

We present an all-sky search for gravitational waves in the frequency range 1 to 6 kHz during the first calendar year of LIGO's fifth science run. This is the first untriggered LIGO burst analysis to be conducted above 3 kHz. We discuss the unique properties of interferometric data in this regime. 161.3 days of triple-coincident data were analyzed. No gravitational events above threshold were observed and a frequentist upper limit of 5.4 year{sup -1} on the rate of strong gravitational-wave bursts was placed at a 90% confidence level. Implications for specific theoretical models of gravitational-wave emission are also discussed.

Abbott, B. P.; Abbott, R.; Adhikari, R.; Anderson, S. B.; Araya, M.; Armandula, H.; Aso, Y.; Ballmer, S.; Barton, M. A.; Betzwieser, J.; Billingsley, G.; Black, E.; Blackburn, J. K.; Bork, R.; Boschi, V.; Brooks, A. F.; Cannon, K. C.; Cardenas, L.; Cepeda, C.; Chalermsongsak, T. [LIGO - California Institute of Technology, Pasadena, California 91125 (United States)] (and others)

2009-11-15T23:59:59.000Z

187

Hanford Site near-facility environmental monitoring data report for calendar year 1998  

Science Conference Proceedings (OSTI)

This document summarizes the results of the U.S. Department of Energy's Near-Facility Environmental Monitoring program conducted by Waste Management Federal Services of Hanford, Inc. for Fluor Daniel Hanford, Inc. for 1998 in the 100,200/600, and 300/400 Areas of the Hanford Site, in southcentral Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

DIEDIKER, L.P.

1999-07-29T23:59:59.000Z

188

Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995  

SciTech Connect

This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.W., Westinghouse Hanford

1996-07-30T23:59:59.000Z

189

Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

1995-08-01T23:59:59.000Z

190

School Calendar  

Science Conference Proceedings (OSTI)

School Calendar. 2013. ... Mon, May 27, Memorial Day, Center closed. Thurs, June 13, Last Day of School for Kindergarten, Graduation at 11:00 AM. ...

2013-03-14T23:59:59.000Z

191

Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

1995-06-01T23:59:59.000Z

192

Hanford site near-facility environmental monitoring annual report, calendar year 1996  

SciTech Connect

This document summarizes the results of the near-facility environmental monitoring results for 1996 in the 100, 200/600, and 300/400 areas of the Hanford Site in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. The monitoring implements applicable portions of DOE Orders 5400.1 (DOE 1988a), 5400.5 (DOE 1990), and 5820.2A (DOE 1988b); Washington Administrative Code (WAC) 246-247; and Title 40 Code of Federal Regulations (CFR) Part 61, Subpart H (EPA 1989). In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels were slightly elevated when compared to offsite locations, the differences are less than in previous years.

Perkins, C.J.

1997-08-05T23:59:59.000Z

193

Calendar Year 2005 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2005 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2005 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2005 monitoring data is deferred to the ''Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium'' (BWXT 2006). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and distinguishing sampling characteristics; (3) an evaluation of hydrologic characteristics, based on pre-sampling groundwater elevations, along with a compilation of available test results (e.g., hydraulic conductivity test data); (4) a discussion of geochemical characteristics based on evaluation of the analytical results for the primary anions and cations; and (5) a detailed analysis and interpretation of the available data for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. The following sections of this report provide details regarding the CY 2005 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regime. Section 2 briefly describes the hydrogeologic system and generalized extent of groundwater contamination in each regime. Section 3 describes the monitoring programs implemented and associated sampling activities performed in each regime during CY 2005. Section 4 presents an a summary of the CY 2005 monitoring data with regard to the provisions of DOE Order 450.1 (surveillance and exit pathway/perimeter monitoring), including highlights of notable findings and time-series plots of data for CY 2005 sampling locations that provide representative examples of long-term contaminant concentration trends. Brief conclusions and proposed recommendations are provided in Section 5. Section 6 lists the documents cited for more detailed operational, regulatory, and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Monitoring well construction details are in Appendix C. Results of field measurements and laboratory analyses of the groundwater and surface water samples collected during CY 2005 are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G co

None

2006-09-01T23:59:59.000Z

194

Calendar Year 2004 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2004 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2004 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2004 monitoring data is deferred to the Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium (BWXT 2005). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and distinguishing sampling characteristics; (3) an evaluation of hydrologic characteristics, based on pre-sampling groundwater elevations, along with a compilation of available test results (e.g., hydraulic conductivity test data); (4) a discussion of geochemical characteristics based on evaluation of the analytical results for the primary anions and cations; and (5) a detailed analysis and interpretation of the available data for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. The following sections of this report provide details regarding the CY 2004 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regime. Section 2 briefly describes the hydrogeologic system and generalized extent of groundwater contamination in each regime. Section 3 describes the monitoring programs implemented and associated sampling activities performed in each regime during CY 2004. Section 4 presents an a summary of the CY 2004 monitoring data with regard to the provisions of DOE Order 450.1 (surveillance and exit pathway/perimeter monitoring), including highlights of notable findings and time-series plots of data for CY 2004 sampling locations that provide representative examples of long-term contaminant concentration trends. Brief conclusions and proposed recommendations are provided in Section 5. Section 6 lists the documents cited for more detailed operational, regulatory, and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Monitoring well construction details are in Appendix C. Results of field measurements and laboratory analyses of the groundwater and surface water samples collected during CY 2004 are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G contai

N /A

2005-09-01T23:59:59.000Z

195

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

Bechtel Jacobs Company LLC

2000-03-01T23:59:59.000Z

196

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 2000  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 2000. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 2000). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 2000, these goals were extended to CY 2001 for all waste streams that generated waste in 2000. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 50 waste streams met or exceeded their reduction goal based on the CY 2000 data.

Bechtel Jacobs Company LLC

2001-03-01T23:59:59.000Z

197

Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri  

SciTech Connect

This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

Not Available

1993-05-01T23:59:59.000Z

198

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1999  

Science Conference Proceedings (OSTI)

The results of the 1999 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 1999. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to create innovations to make fusion power a practical reality--an alternative energy source. 1999 marked the first year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. The 1999 performance of the Princeton Plasma Physics Laboratory was rated ''outstanding'' by the U.S. Department of Energy in the Laboratory Appraisal report issued early in 2000. The report cited the Laboratory's consistently excellent scientific and technological achievements, its successful management practices, and included high marks in a host of other areas including environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Virginia Finley

2001-04-20T23:59:59.000Z

199

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2001  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of the Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2001 environmental surveillance and monitoring program for PPPL are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2001. PPPL has engaged in fusion energy research since 1951. The vision of the Laboratory is to create innovations to make fusion power a practical reality--a clean, alternative energy source. The Year 2001 marked the third year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. In 2001, PPPL's radiological environmental monitoring program measured tritium in the air at on- and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations; also included in PPPL's radiological environmental monitoring program, are water monitoring--precipitation, ground-, surface-, and waste-waters. PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report. Groundwater monitoring continue d under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the low levels of volatile organic compounds in an area adjacent to PPPL. In 2001, PPPL was in compliance with its permit limits for surface and sanitary discharges and had no reportable releases. Additionally, as part of DOE's program for the purchase of recycled content and other environmentally preferred products, PPPL has ranked in the excellent category of 80 to 90% of the goal.

Virginia L. Finley

2004-04-07T23:59:59.000Z

200

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2000  

Science Conference Proceedings (OSTI)

The results of the 2000 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2000. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to create innovations to make fusion power a practical reality -- an alternative energy source. The year 2000 marked the second year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion power plants. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. In 2000, PPPL's radiological environmental monitoring program measured tritium in the air at on-site and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations with limits set by the Environmental Protection Agency (EPA). Also included in PPPL's radiological environmental monitoring program, are precipitation, surface, ground, a nd waste water monitoring. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report.

Virginia L. Finley

2002-04-22T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1991  

SciTech Connect

This is the sixth report submitted to Congress under section 5(d)(2)(E)(ii)(II) of the Low-Level Radioactive Waste Policy Act of 1985 (the Act). This section of the Act directs the Department of Energy (DOE) to summarize the annual expenditures of funds disbursed from the DOE surcharge escrow account and to assess compliance of these expenditures with the limitations specified in the Act. In addition to placing limitations on the use of these funds, the Act also requires the nonsited compact regions and nonmember States to provide DOE with an itemized report of their expenditures on December 31 of each year in which funds are expended. Within 6 months after receiving the individual reports, the Act requires the Secretary to furnish Congress with a summary of the reported expenditures and an assessment of compliance with the specified usage limitations. This report fulfills that requirement. DOE disbursed funds totaling $15,037,778.91 to the States and compact regions following the July 1, 1986, January 1, 1988, and January 1, 1990, milestones specified in the Act. Of this amount, $3,517,020.56 was expended during calendar year 1991 and $6,602,546.24 was expended during the prior 5 years. At the end of December 1991, $4,918,212.11 was unexpended. DOE has reviewed each of the reported expenditures and concluded that all reported expenditures comply with the spending limitations stated in section 5(d)(2)(E)(i) of the Act.

Not Available

1992-06-01T23:59:59.000Z

202

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1990  

SciTech Connect

This is the fifth report submitted to Congress under Title 1, section 5(d)(2)(E) of Public Law 99--240, The Low-Level Radioactive Waste Policy Amendments Act of 1985'' (the Act). This section of the Act requests the Department of Energy (DOE) to summarize the annual expenditures of funds disbursed from the DOE surcharge escrow account and to assess compliance of these expenditures with the specified limitations. The Act places limitations on the use of these funds and requires the nonsited compact regions and nonmember States to provide DOE with an itemized report of their expenditures on December 31 of each year in which funds are expended. Within 6 months after receiving the individual reports, DOE is to furnish Congress a summary of the reported expenditures and an assessment of compliance with the limitations on the use of these funds specified in the Act. This report fulfills that requirements. DOE disbursed funds totaling $15,006,587.76 to the States and compact regions following the July 1, 1986, January 1, 1988, and January 1, 1990, milestones. Of this amount, $4,328,340.44 was expended during calendar year 1990 and $2,239,205.80 was expended during the prior 4 years. At the end of December 1990, $8,439,041.52 was unexpended. 5 tabs.

Not Available

1991-06-01T23:59:59.000Z

203

Argonne National Laboratory-East summary site environmental report for calendar year 2002.  

DOE Green Energy (OSTI)

Argonne performs research and development in many areas of science and technology. General fields of research at Argonne include, but are not limited to, biosciences, biotechnology, chemical engineering, chemistry, decision and information sciences, energy systems and technology, high energy physics, materials science, math and computer science, nuclear reactors, physics, and environmental science. Argonne is not, and never has been, a weapons laboratory. Several missions provide focus for Argonne scientists. Basic research helps better understand the world, and applied research helps protect and improve it. For example, the prairies of Argonne provide sites for environmental studies that provide valuable information about invader species and the food webs within ecosystems. Argonne also operates world-class research facilities, such as the Advanced Photon Source (APS), which is a national research facility funded by the U.S. Department of Energy (DOE). Scientists use high brilliance X-rays from the APS for basic and applied research in many fields. Argonne also seeks to ensure our energy future. Currently, scientists and engineers are developing cleaner and more efficient energy sources, such as fuel cells and advanced electric power generation. Argonne has spent much of its history on developing nuclear reactor technology. That research is now being applied to American and Soviet nuclear reactors to improve the safety and life of the reactors. Other Argonne research seeks to improve the way we manage our environment. For example, Argonne scientists created a new catalyst that could help carmakers eliminate 95 percent of nitrogen-oxide emitted by diesel engines by the year 2007. Research and development solutions such as these will help protect our ecosystems.

Golchert, N. W.; Kolzow, R. G.

2004-03-08T23:59:59.000Z

204

Calendar Year 2011 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

SciTech Connect

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2011 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. This report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and known extent of groundwater contamination. The CY 2011 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by the DOE Environmental Management (EM) contractor responsible for environmental cleanup on the ORR. In August 2011, URS | CH2M Oak Ridge LLC (UCOR) replaced Bechtel Jacobs Company LLC (BJC) as the DOE EM contractor. For this report, BJC/UCOR will be referenced as the managing contractor for CY 2011. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC/UCOR (i.e., coordinating sample collection and sharing data) ensures that the CY 2011 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. This report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC/UCOR. Such details are deferred to the respective programmatic plans and reports issued by BJC. Collectively, the groundwater and surface water monitoring data obtained during CY 2011 by the Y-12 GWPP and BJC/UCOR address DOE Order 436.1 and DOE Order 458.1 requirements for monitoring groundwater and surface water quality in areas (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring) and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). This report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. This report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC,

2012-12-01T23:59:59.000Z

205

Calendar Year 2007 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2007 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2007 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2007 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT), and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). In December 2007, the BWXT corporate name was changed to Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12), which is applied to personnel and organizations throughout CY 2007 for this report. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2007 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2007 by the Y-12 GWPP and BJC address DOE Order 450.1 (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater and surface water contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC

2008-12-01T23:59:59.000Z

206

Calendar Year 2010 Groundwater Monitoring Report, U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2010 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2010 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2010 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2010 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC

2011-12-01T23:59:59.000Z

207

Calendar Year 2009 Groundwater Monitoring Report, U.S. Department of Energy, Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2009 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2009 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2009 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2009 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for the wells in each regime that were sampled during CY 2009 by either the Y-1

Elvado Environmental LLC

2010-12-01T23:59:59.000Z

208

NERSC Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

to display correctly. You can visit the HTML-only version of this page at: https:www.google.comcalendarhostedlbl.govhtmlembed?titleNERSC%20EVENTS&showTabs0&showCalendars0&...

209

Calendar Day  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION / Refiner / Location CORPORATION / Refiner / Location Table 5. Refiners' Total Operable Atmospheric Crude Oil Distillation Capacity as of January 1, 2013 Calendar Day Barrels per CORPORATION / Refiner / Location Calendar Day Barrels per Companies with Capacity Over 100,000 bbl/cd .............................................................................................................................. VALERO ENERGY CORP 1,863,300 Valero Refining Co Texas LP .............................................................................................................................. Texas City, Texas 225,000 .............................................................................................................................. Corpus Christi, Texas 200,000 .............................................................................................................................. Houston, Texas

210

Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20.2.73 NMAC) for Calendar Year 2003  

Science Conference Proceedings (OSTI)

Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2003, the Technical Area 3 steam plant and the air curtain destructors were the primary sources of criteria air pollutants from the Laboratory, while the air curtain destructors and chemical use associated with research and development activities were the primary sources of volatile organic compounds and hazardous air pollutants. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions were reported from chemical use as well as from all combustion sources. In addition, estimates of particulate matter with diameter less than 2.5 micrometers and ammonia were provided as requested by the New Mexico Environment Department, Air Quality Bureau.

M. Stockton

2005-01-01T23:59:59.000Z

211

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2001  

Science Conference Proceedings (OSTI)

No significant environmental problems were identified at the National Energy Technology Laboratory (NETL) sites in Morgantown (MGN), Pittsburgh (PGH), Tulsa (NPTO) and Fairbanks (AEO) during 2001. No radionuclides were released from the sites during 2001. The sites maintain two major environmental programs: waste management, and environmental media and release management. These two programs encompass waste handling, storage, and disposal, waste minimization and pollution prevention, air quality emissions, surface-water discharges, groundwater impacts, industrial wastewater discharges, and spill control procedures. The Morgantown and Pittsburgh sites currently maintain complete monitoring programs for groundwater, stormwater discharge, laboratory wastewater discharge, and meteorological data. In addition, an annual air emissions inventory is prepared. A comprehensive Directives Program aimed at managing environmental, safety, health requirements, and risks was initiated in 1997, continued through subsequent years, and will be completed in 2003. The primary objective of the program is to identify and implement standards that will protect the health and safety of workers, public, and the environment. This program started with a careful and thorough analysis of risks confronting workers and the communities surrounding NETL sites. Following this analysis, requirements and best management practices were evaluated to determine how requirements could best be used to advance the mission of NETL. Teams of subject-matter experts analyzed the work assigned to determine potential hazards and identify ways to remove or control those hazards. In 2001, NETL developed or revised a series of directives in two major areas: safety analysis and review (SAR) processes, and integrated safety management (ISM) directives. SAR directives were issued for research and development (R&D) operations, support operations, and facilities. ISM directives were released on management processes, such as standards maintenance, performance measures, assessments, corrective actions, lessons-learned, and training. In conjunction with the Directives Program, the use of the voluntary environmental management system, ISO 14001, was evaluated. This includes the only international environmental management standard to which an entity can be certified. NETL is using the specifications and guidance from this standard to identify an effective environmental management system for the NETL sites. An outside consultant performed an environmental management system assessment (also referred to as an initial environmental review), as referenced in ISO 14004. The objective of the assessment was to determine the degree to which NETL's existing integrated safety management system (ISMS), safety analysis review system (SARS), and environmental management programs conformed with the ISO14001 Environmental Management System (EMS) standard and the United States Environmental Protection Agency's (EPA) Code of Environmental Management Principles. A performance measurement system continued to be maintained during 2001 to assist in evaluating how effectively activities at NETL meet mission-critical goals and how well missions and strategies are connected in the DOE strategic plan. This system also provides data to assist in gauging performance against the DOE critical success factors, that is, performance against technical objectives. Various environmental milestones can be tracked to completion, thus giving NETL measures by which to gauge the sites' goals of remaining in regulatory compliance and achieving best-in-class environmental performance.

National Energy Technology Laboratory

2002-10-01T23:59:59.000Z

212

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2014  

SciTech Connect

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2014 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP during CY 2014 to achieve the following goals: 􀁸 to protect the worker, the public, and the environment; 􀁸 to maintain surveillance of existing and potential groundwater contamination sources; 􀁸 to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; 􀁸 to identify and characterize long-term trends in groundwater quality at Y-12; and 􀁸 to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12.

none,

2013-09-01T23:59:59.000Z

213

Calendar Year 2001 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2001 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee. The monitoring data were obtained from groundwater and surface water sampling locations within three hydrogeologic regimes at Y-12. The following sections of this report provide details regarding the CY 2001 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regimes. Section 2 identifies the sampling locations in each hydrogeologic regime and the corresponding sampling frequency during CY 2001, along with the associated quality assurance/quality control (QA/QC) sampling. Section 3 describes groundwater and surface water sample collection and Section 4 identifies the field measurements and laboratory analytes for each sampling location. Section 5 outlines the data management protocols and data quality objectives (DQOs). Section 6 describes the groundwater elevation monitoring in each regime during CY 2001 and Section 7 lists the documents cited for more detailed operational, regulatory, and technical information.

None

2002-03-31T23:59:59.000Z

214

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1988  

SciTech Connect

This is the third report submitted to Congress under Public Law 99-240, The Low-Level Radioactive Waste Policy Amendments Act of 1985'' (the Act). This section of the Act requires the Department of Energy to summarize the annual expenditures made by states and compacts of funds disbursed from the Department's Surcharge Escrow Account, and to assess the compliance of these expenditures with the specified limitations. This report covers expenditures made during calendar year 1988 from funds disbursed to states and compacts following the July 1, 1986, and January 1, 1988, milestones. The next milestone in the Act is January 1, 1990, following which the accumulated surcharge deposits in the Department's Surcharge Escrow Account will again be disbursed. The Act authorizes states with operating low-level radioactive waste disposal sites (sited states) to collect surcharges on disposal of waste from generators located in compact regions currently without disposal sites (non-sited compacts) and in states that do not have sites and that are not members of compacts (nonmember states). The Act requires the sited states to make a monthly deposit to the Department of Energy's Surcharge Escrow Account of 25 percent of the surcharges they collect. Following each milestone date, the Department is required to disburse these funds, with accrued interest, back to those non-sited compacts and nonmember states found in compliance with the milestone requirements for new disposal site development. 4 tabs.

Not Available

1989-06-01T23:59:59.000Z

215

Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2003-09-01T23:59:59.000Z

216

Calendar year 2003 : annual site enviromental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2004-09-01T23:59:59.000Z

217

Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997  

Science Conference Proceedings (OSTI)

This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects.

Reynolds, R.D.; Warren, R.W. [eds.

1998-05-01T23:59:59.000Z

218

Hanford Site near-facility environmental monitoring annual report, calendar year 1997  

SciTech Connect

Near-facility environmental monitoring provides a means to measure the impacts of operations, waste management, and remediation activities on the environment adjacent to facilities and ensure compliance with local, state, and federal environmental regulations. Specifically, near-facility environmental monitoring monitors new and existing sites, processes, and facilities for potential impacts and releases; fugitive emissions and diffuse sources associated with contaminated areas, facilities (both active and those undergoing surveillance and maintenance), and environmental restoration activities. External radiation, ambient air particulates, ground and surface water, soil, sediment, and biota (plants and animals) are sampled or monitored. Parameters include, as appropriate, radionuclides; radiation fields; chemical or physical constituents, such as nitrates; pH; and water temperature. All ambient air results were below the US Department of Energy (DOE) Derived Concentration Guides (DCGs). Groundwater concentrations at the two wells at the 107-N Facility were below both the DOE DCG and US Environmental Protection Agency Interim Drinking Water Standards for gamma emitting radionuclides. Soil and vegetation results were generally within historic ranges and mostly below the Accessible Soil Concentration limits (included in HNF-PRO-454, Inactive Waste Sites) with the exception of one soil sampling location at 1 00 N Area. External radiation fields continued an overall downward trend. Surface water disposal unit samples (water, sediment, and aquatic vegetation) showed radionuclide concentrations below their respective DCG and Accessible Soil Concentration limits. The 100 N Area Columbia river shoreline springs results were below DCGs with the exception of one Sr concentration. More than 4,600 ha (11,300 acres) of radiologically controlled areas were surveyed in 1997, approximately the same as in 1996.

Perkins, C.J.

1998-07-28T23:59:59.000Z

219

Westinghouse Hanford Company Health and Safety Performance Report. First quarter calendar year 1995  

SciTech Connect

During the first quarter of CY 1995, four of the WHC sitewide ALARA performance goals were completed on or ahead of schedule. One of the completed goals related to reduction of radiological areas at WHC-managed facilities. Due to anticipated resource reductions and increased scope of work, several facilities escalated their reduction schedule. This allowed the ALARA goal to be completed and exceeded ahead of schedule. Industrial Safety and Health initiatives are being pursued in areas such as workplace ergonomics, safety training, and standards development. Positive efforts are ongoing in the areas of management commitment and employee involvement through the WHC Voluntary Protection Program. Successful implementation continues through the President`s Accident Prevention Council (PAPC) and division employee Accident Prevention Councils. The Company now has established CY 1995 PAPC goals. Major programmatic accomplishments completed during this reporting period include the Department of Energy-Headquarters (DOE-HQ) formally endorsing the Radiological Control organization`s approach toward development of the Radiation Protection Program (RPP) document. The DOE-HQ has recognized the significant contributions and leadership that Radiological Control has provided in planning and implementation of this ``model example of an RPP`` across the DOE complex and is encouraging other sites to contact WHC for assistance in developing their RPPs.

Lansing, K.A.

1995-05-01T23:59:59.000Z

220

Argonne National Laboratory-East site environmental report for calendar year 1995  

Science Conference Proceedings (OSTI)

This report presents the environmental report for the Argonne National Laboratory-East for the year of 1995. Topics discussed include: general description of the site including climatology, geology, seismicity, hydrology, vegetation, endangered species, population, water and land use, and archaeology; compliance summary; environmental program information; environmental nonradiological program information; ground water protection; and radiological monitoring program.

Golchert, N.W.; Kolzow, R.G. [Environmental Management Operation, Argonne National Lab., IL (United States)

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1992  

SciTech Connect

This is the seventh report submitted to Congress in accordance with section 5(d)(2)(E)(ii)(II) of Title I--Low-Level Radioactive Waste Policy Amendments Act of 1985 (the Act). This section of the Act directs the Department of Energy (DOE) to summarize the annual expenditures of funds disbursed from the DOE surcharge escrow account and to assess compliance of these expenditures with the limitations specified in the Act. In addition to placing limitations on the use of these funds, the Act also requires the nonsited compact regions and nonmember States to provide DOE with an itemized report of their expenditures on December 31 of each year in which funds are expended. Within 6 months after receiving the individual reports, the Act requires the Secretary to furnish Congress with a summary of the reported expenditures and an assessment of compliance with the specified usage limitations. This report fulfills that requirement. DOE disbursed funds totaling $15,037,778.91 to the States and compact regions following the July 1, 1986, January 1, 1988, and January 1, 1990, milestones specified in the Act. Of this amount, $1,445,701.61 was expended during calendar year 1992 and $10,026,763.87 was expended during the prior 6 years. At the end of December 1992, $3,565,313.43 was unexpended. DOE has reviewed each of the reported expenditures and concluded that all reported expenditures comply with the spending limitations stated in section 5(d)(2)(E)(i) of the Act.

Not Available

1993-06-01T23:59:59.000Z

222

Nevada test site annual site environmental report for calendar year 1995  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1995 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

NONE

1996-09-01T23:59:59.000Z

223

Nevada Test Site annual site environmental report for calendar year 1996  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location.

Black, S.C.; Townsend, Y.E. [eds.

1997-10-01T23:59:59.000Z

224

Open cycle liquid desiccant dehumidifier and hybrid solar/electric absorption refrigeration system. Annual report, January 1993--December 1993. Calendar year 1993  

DOE Green Energy (OSTI)

This annual report presents work performed during calendar year 1993 by the Florida Solar Energy Center under contract to the US Department of Energy. Two distinctively different solar powered indoor climate control systems were analyzed: the open cycle liquid desiccant dehumidifier, and an improved efficiency absorption system which may be fired by flat plate solar collectors. Both tasks represent new directions relative to prior FSEC research in Solar Cooling and Dehumidification.

Nimmo, B.G.; Thornbloom, M.D.

1995-04-01T23:59:59.000Z

225

Hanford Double-Shell Tank Inspection Annual Report Calendar Year 2012  

SciTech Connect

The double-shell tanks (DSTs) were constructed between 1968 and 1986. They will have exceeded their design life before the waste can be removed and trasferred to the Waste Treatment and Immobilization Plant for vitrification. The Double-Shell Tank Integrity Project has been established to evaluate tank aging, and ensure that each tank is structurally sound for continued use. This is the first issue of the Double-Shell Tank Inspection Annual Report. The purpose of this issue is to summarize the results of DST inspections conducted from the beginnng of the inspection program through the end of CY2012. Hereafter, the report will be updated annually with summaries of the past year's DST inspection activities.

Petermann, Tasha M.; Boomer, Kayle D.; Washenfelder, D. J.

2013-12-02T23:59:59.000Z

226

Radionuclide Air Emissions Report for the Hanford Site Calendar year 1998  

SciTech Connect

This report documents radionuclide air emissions from the Hanford Site in I998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR SI), Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246-247, Radiation Protection--Air Emissions. The federal regulations in 40 CFR 61, Subpart H; require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv), which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.5 E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE, which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event was similar in magnitude to that from routine releases during 1998. Were the release from this unplanned event combined with routine releases, the total dose would be less than 1 percent ofthe 10 mrem/yr standard.

DIEDIKER, L.P.

1999-06-15T23:59:59.000Z

227

Nevada Test Site annual site environmental report for calendar year 1997  

Science Conference Proceedings (OSTI)

Monitoring and surveillance, on and around the Nevada Test Site, (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1997, indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above existing background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA`s) Clean Air Package 1988 (CAP88)-PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.089 mrem. Hazardous wastes were shipped offsite to approved disposal facilities.

Black, S.C.; Townsend, Y.E. [eds.

1998-10-01T23:59:59.000Z

228

Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1994  

Science Conference Proceedings (OSTI)

Detailed information pertaining to As Low As Reasonably Achievable/Contamination Control Improvement Project (ALARA/CCIP) activities are outlined. Improved commitment to the WHC ALARA/CCIP Program was experienced throughout FY 1994. During CY 1994, 17 of 19 sitewide ALARA performance goals were completed on or ahead of schedule. Estimated total exposure by facility for CY 1994 is listed in tables by organization code for each dosimeter frequency. Facilities/areas continue to utilize the capabilities of the RPR tracking system in conjunction with the present site management action-tracking system to manage deficiencies, trend performance, and develop improved preventive efforts. Detailed information pertaining to occupational injuries/illnesses are provided. The Industrial Safety and Hygiene programs are described which have generated several key initiatives that are believed responsible for improved safety performance. A breakdown of CY 1994 occupational injuries/illnesses by type, affected body group, cause, job type, age/gender, and facility is provided. The contributing experience of each WHC division/department in attaining this significant improvement is described along with tables charting specific trends. The Radiological Control Program is on schedule to meet all RL Site Management System milestones and program commitments.

Lansing, K.A.

1995-03-01T23:59:59.000Z

229

Strategic Petroleum Reserve annual site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

This report, provided annually in accordance with DOE Order 5400.1, summarizes monitoring data collected to assess Strategic Petroleum Reserve (SPR) impacts on the environment. The report serves as a management tool for mitigating such impacts, thus serving the public interest by ensuring environmentally sound operation of the SPR. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1992. The active permits and the results of the environmental monitoring program (i.e., air, surface water, ground water, and water discharges) are discussed within each section by site. The quality assurance program is presented which includes results from laboratory and field audits and studies performed internally and by regulatory agencies. In general, no significant adverse environmental impact resulted from any SPR activities during 1992. Environmental areas of concern, such as potential ground water contamination, are fully addressed in the applicable section by site. The SPR continues to maintain an overall excellent environmental record.

Not Available

1993-06-01T23:59:59.000Z

230

Westinghouse Hanford Company health and safety performance report. Third quarter calendar year 1995  

SciTech Connect

The lost/restricted workday severity rate posted in CY 1994 of 45.50 was a significant improvement over the prior years and, remarkably, this rate has been reduced to 16.40 thus far in CY 1995 (Table 2--2). The indications from this sustained reduction are that employee, management, HEHF, and accident investigator efforts to manage injuries are becoming stronger (page 2--8). Congratulations to the Human Resources Department for working over 835,000 hours without a lost workday away injury/illness! The last lost workday away case occurred on 12/17/92. The Workers Compensation Report shows significant reduction in the amount of money expended for medical treatments and time loss due to industrial injuries. The cost of insurance continues to decrease. Continued savings can be attributed to aggressive claims and safety case management, an enhanced attitude by management creating a positive and proactive safety awareness culture, and a more aggressive return-to-work philosophy.

Lansing, K.A.

1995-11-01T23:59:59.000Z

231

Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report  

Science Conference Proceedings (OSTI)

The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D. [and others

1993-10-01T23:59:59.000Z

232

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2007  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was operated as the nation's site for nuclear weapons testing. The release of man-made radionuclides from the NTS as a result of testing activities has been monitored since the first decade of atmospheric testing. After 1962, when nuclear tests were conducted only underground, the radiation exposure to the public surrounding the NTS was greatly reduced. After the 1992 moratorium on nuclear testing, radiation monitoring on the NTS focused on detecting airborne radionuclides which come from historically contaminated soils resuspended into the air (e.g., by winds) and tritium-contaminated soil moisture emitted to the air from soils through evapotranspiration. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This is the dose limit established for someone living off of the NTS from radionuclides emitted to air from the NTS. This limit does not include the radiation doses that members of the public may receive through the intake of radioactive particles unrelated to NTS activities, such as those that come from naturally occurring elements in the environment (e.g., naturally occurring radionuclides in soil or radon gas from the earth or natural building materials), or from other man-made sources (e.g., medical treatments). The NTS demonstrates compliance using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. There are six critical receptor locations on the NTS that are actually pseudocritical receptor locations because they are hypothetical receptor locations; no person actually resides at these onsite locations. Annual average concentrations of detected radionuclides are compared with Concentration Levels (CL) for Environmental Compliance values listed in 40 CFR 61, Appendix E, Table 2. Compliance is demonstrated if the sum of fractions (CL/measured concentrations) of all detected radionuclides at each pseudo-critical receptor location is less than one. In 2007, as in all previous years for which this report has been produced, the NTS has demonstrated that the potential dose to the public from radiological emissions to air from current and past NTS activities is well below the 10 mrem/yr dose limit. Air sampling data collected onsite at each of the six pseudo-critical receptor stations on the NTS had average concentrations of nuclear test-related radioactivity that were a fraction of the limits listed in Table 2 in Appendix E of 40 CFR 61. They ranged from less than 1 percent to a maximum of 20 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS.

Robert Grossman; Ronald Warren

2008-06-01T23:59:59.000Z

233

Princeton Plasma Physics Laboratory (PPPL) annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for CY93. The report is prepared to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, added to the environment as a result of PPPL operations, as well as environmental initiatives, assessments, and programs that were undertaken in 1993. The objective of the Annual Site Environmental Report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to develop and demonstrate the practical application of fusion power as an alternate energy source. In 1993, PPPL had both of its two large tokamak devices in operation; the Tokamak Fusion Test Reactor (TFTR) and the Princeton Beta Experiment-Modification (PBX-M). PBX-M completed its modifications and upgrades and resumed operation in November 1991. TFTR began the deuterium-tritium (D-T) experiments in December 1993 and set new records by producing over six million watts of energy. The engineering design phase of the Tokamak Physics Experiment (TPX), which replaced the cancelled Burning Plasma Experiment in 1992 as PPPL`s next machine, began in 1993 with the planned start up set for the year 2001. In 1993, the Environmental Assessment (EA) for the TFRR Shutdown and Removal (S&R) and TPX was prepared for submittal to the regulatory agencies.

Finley, V.L.; Wiezcorek, M.A.

1995-01-01T23:59:59.000Z

234

Calendar Year 2002 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2002 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2002 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The sections of this report provide details regarding the CY 2002 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regimes. Section 2 describes the monitoring programs implemented by the Y-12 GWPP and BJC during CY 2002. Section 3 identifies the sampling locations in each hydrogeologic regime and the corresponding sampling frequency during CY 2002, along with the associated quality assurance/quality control (QA/QC) sampling. Section 4 describes groundwater and surface water sample collection and Section 5 identifies the field measurements and laboratory analytes for each sampling location. Section 6 outlines the data management protocols and data quality objectives (DQOs). Section 7 describes the groundwater elevation monitoring in each regime during CY 2002 and Section 8 lists the documents cited for more detailed operational, regulatory, and technical information.

None

2003-03-31T23:59:59.000Z

235

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2008  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to under-ground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by winds) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the North Las Vegas Facility (NLVF), an NTS support complex in the city of North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2008a) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from other man-made sources such as medical treatments. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2008a). At any one location, if multiple radionuclides are detected then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2008, the potential dose from radiological emissions to air, from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.9 mrem/yr; well below the 10 mrem/yr dose limit. Air sampling data collected at all six pseudo-critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61 (CFR, 2008a). Concentrations ranged from less than 1 percent to a maximum of 19 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS. Potential dose to the public from NLVF was also very low at 0.00006 mrem/yr; more than 160,000 times lower than the 10 mrem/yr limit.

Ronald Warren and Robert F. Grossman

2009-06-30T23:59:59.000Z

236

National Emission Standards for Hazardous Air Pollutants - Radionuclide Emissions, Calendar Year 2011  

SciTech Connect

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office operates the Nevada National Security Site (NNSS) and North Las Vegas Facility (NLVF). From 1951 through 1992, the NNSS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NNSS activities has been monitored since the initiation of atmospheric testing. Limitation to underground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NNSS. After nuclear testing ended in 1992, NNSS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of legacy-related tritium are also emitted to air at the NLVF, an NNSS support complex in North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy (DOE) facility to that which would cause 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation unrelated to NNSS activities. Unrelated doses could come from naturally occurring radioactive elements, from sources such as medically or commercially used radionuclides, or from sources outside of the United States, such as the damaged Fukushima nuclear power plant in Japan. Radionuclides from the Fukushima nuclear power plant were detected at the NNSS in March 2011 and are discussed further in Section III. The NNSS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the EPA for use on the NNSS in 2001 and has been the sole method used since 2005. Six locations on the NNSS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2. For multiple radionuclides, compliance is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2011, the potential dose from radiological emissions to air, resulting from both current and past NNSS activities, at onsite compliance monitoring stations was well below the 10 mrem/yr dose limit. Air sampling data collected at all air monitoring stations had average concentrations of radioactivity that were a fraction of the CL values. Concentrations ranged from less than 1% to a maximum of 12.2% of the allowed NESHAP limit. Because the nearest member of the public resides about 20 kilometers from potential release points on the NNSS, dose to the public would be only a small fraction of the value measured on the NNSS. The potential dose to the public from NLVF emissions was also very low at 0.000024 mrem/yr, more than 400,000 times lower than the 10 mrem/yr limit.

NSTec Ecological and Environmental Monitoring

2012-06-19T23:59:59.000Z

237

National Emission Standards for Hazardous Air Pollutants - Radionuclide Emissions Calendar Year 2012  

SciTech Connect

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) operates the Nevada National Security Site (NNSS) and North Las Vegas Facility (NLVF). From 1951 through 1992, the NNSS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NNSS activities has been monitored since the initiation of atmospheric testing. Limitation to underground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NNSS. After nuclear testing ended in 1992, NNSS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of legacy-related tritium are also emitted to air at the NLVF, an NNSS support complex in North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR 2010a) limits the release of radioactivity from a U.S. Department of Energy (DOE) facility to that which would cause 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation unrelated to NNSS activities. Unrelated doses could come from naturally occurring radioactive elements, from sources such as medically or commercially used radionuclides, or from sources outside of the United States, such as the damaged Fukushima nuclear power plant in Japan in 2011. NNSA/NFO demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations on the NNSS (U.S. Environmental Protection Agency [EPA] and DOE 1995). This method was approved by the EPA for use on the NNSS in 2001 (EPA 2001a) and has been the sole method used since 2005. Six locations on the NNSS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR 2010a). For multiple radionuclides, compliance is demonstrated when the sum of the fractions (determined by dividing each radionuclides concentration by its CL and then adding the fractions together) is less than 1.0. In 2012, the potential dose from radiological emissions to air, resulting from both current and past NNSS activities, was well below the 10 mrem/yr dose limit. Air sampling data collected at all air monitoring stations had average concentrations of radioactivity that were a fraction of the CL values. Concentrations ranged from less than 0.5% to a maximum of 11.1% of the allowed NESHAP limit. Because the nearest member of the public resides about 9 kilometers from potential release points on the NNSS, dose to the public would be only a small fraction of the value measured on the NNSS. The potential dose to the public from NLVF emissions was also very low at 0.000024 mrem/yr, more than 400,000 times lower than the 10 mrem/yr limit.

Warren, R.

2013-06-10T23:59:59.000Z

238

Calendar Year Reports Archive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

reports-archive Office of Inspector reports-archive Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Special Report: DOE/IG-0901 http://energy.gov/ig/downloads/special-report-doeig-0901 Special Report: DOE/IG-0901

239

Calendar Year 2004  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Office of Inspector General 
1000 4 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: IG-0669 http://energy.gov/ig/downloads/audit-report-ig-0669 Audit Report: IG-0669

240

Calendar Year 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Office of Inspector General 
1000 9 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Special Inquiry Report: S09IS024 http://energy.gov/ig/downloads/special-inquiry-report-s09is024 Special Inquiry Report: S09IS024

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Calendar Year 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Office of Inspector General 
1000 8 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Special Report: IG-0808 http://energy.gov/ig/downloads/special-report-ig-0808 Special Report: IG-0808

242

Calendar Year 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Office of Inspector General 
1000 6 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Letter Report: OAS-L-07-04 http://energy.gov/ig/downloads/audit-letter-report-oas-l-07-04 Audit Letter Report: OAS-L-07-04

243

Calendar Year 2014  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Office of Inspector General 
1000 4 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Special Report: DOE/IG-0901 http://energy.gov/ig/downloads/special-report-doeig-0901 Special Report: DOE/IG-0901

244

Calendar Year 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Office of Inspector General 
1000 5 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-M-06-03 http://energy.gov/ig/downloads/audit-report-oas-m-06-03 Audit Report: OAS-M-06-03

245

Calendar Year 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Office of Inspector General 
1000 1 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Inspection Report: INS-L-12-01 http://energy.gov/ig/downloads/inspection-report-ins-l-12-01 Inspection Report: INS-L-12-01

246

Calendar Year 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Office of Inspector General 
1000 0 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-RA-L-11-02 http://energy.gov/ig/downloads/audit-report-oas-ra-l-11-02 Audit Report: OAS-RA-L-11-02

247

Calendar Year 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Office of Inspector General 
1000 7 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Inspection Report: IG-0784 http://energy.gov/ig/downloads/inspection-report-ig-0784 Inspection Report: IG-0784

248

Calendar Year 2003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: IG-0634 http://energy.gov/ig/downloads/audit-report-ig-0634 Audit Report: IG-0634

249

Calendar Year 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Avenue, SW Washington, DC 20585 202-586-4128 en Audit Report: OAS-L-13-03 http:energy.govigdownloadsaudit-report-oas-l-13-03

250

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

SciTech Connect

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, E.C.; Fuhrman, P.W.

2002-05-30T23:59:59.000Z

251

Nuclear Materials Focus Area Fiscal Year 2002 Mid Year Review  

Science Conference Proceedings (OSTI)

The Nuclear Materials Focus Area (NMFA) held its annual mid-year review on February 12 and 14, 2002, in Santa Fe, New Mexico. The purpose of this review was to examine both the technical aspects and the programmatic aspects of its technology development program. The focus area activities were reviewed by a panel consisting of personnel representing the end users of the technologies, and technical experts in nuclear materials. This year's review was somewhat different than in the past, as the stress was on how well the various projects being managed through the NMFA aligned with the two thrust areas and nine key goals and priorities recently issued by the Deputy Assistant Secretary for DOE's Office of Environmental Management (EM).

Thiel, Elizabeth Chilcote

2002-05-01T23:59:59.000Z

252

Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0).

Elvado Environmental LLC

2009-12-01T23:59:59.000Z

253

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2011  

SciTech Connect

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2011 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2011 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2011 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2011 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2011) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

Elvado Environmental LLC

2010-12-01T23:59:59.000Z

254

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012  

SciTech Connect

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2012 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2012) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

Elvado Environmental, LLC

2011-09-01T23:59:59.000Z

255

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010  

Science Conference Proceedings (OSTI)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

Elvado Environmental LLC

2009-09-01T23:59:59.000Z

256

Annual report to the President and the Congress on the State Energy Conservation Program for calendar year 1985  

SciTech Connect

Many of the 1985 objectives were brought forward from 1984 as part of a multi-year plan. Thus, the 1985 achievements must be measured as progressive milestones toward achieving the ultimate goal. A few of these milestones are programmatic monitoring strengthened by a revision and implementation of new monitoring guidelines; states developed increased awareness of the need to bring other partners into their projects to add to their resources; multi-regional meetings between states were held to transfer project information between the states, training and technical assistance were provided by DOE for SECP grantees; and there was the continued development of state self-sufficiency in the SECP area.

Not Available

1986-10-01T23:59:59.000Z

257

Calendar year 1993 groundwater quality report for the Upper East Fork Poplar Creek hydrogeologic regime Y-12 Plant, Oak Ridge, Tennessee: 1993 groundwater quality data interpretations and proposed program modifications  

SciTech Connect

This Groundwater Quality Report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1993 calendar year (CY) at the U.S. Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee (Figure 1). The groundwater quality data are presented in Part 1 of the GWQR submitted by Martin Marietta Energy Systems, Inc. (Energy Systems) to the Tennessee Department of Environment and Conservation (TDEC) in February 1994 (HSW Environmental Consultants, Inc. 1994a). Groundwater quality data evaluated in this report were obtained at several hazardous and non-hazardous waste management facilities and underground storage tanks (USTS) located within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to provide for protection of groundwater resources consistent with federal, state, and local requirements and in accordance with DOE Orders and Energy Systems corporate policy. The annual GWQR for the East Fork Regime is completed in two parts. Part 1 consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality, presents the findings and status of ongoing hydrogeologic studies, describes changes in monitoring priorities, and presents planned modifications to the groundwater sampling and analysis program for the following calendar year.

NONE

1994-10-01T23:59:59.000Z

258

Calendars and Software  

Science Conference Proceedings (OSTI)

Meteorologists need to be able to manipulate arbitrary dates in the past, present, and future. Here calendar rules for both the Julian (old) and Gregorian (modern) calendars are reviewed. The author describes free software available online to ...

Jon E. Ahlquist

2000-01-01T23:59:59.000Z

259

ARM - NSA Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

the Site Images Information for Guest Scientists Contacts NSA Calendar Alan JensenTower Systems Tower inspection, maintenance and installation of lighting kit 2013.10.02 ...

260

Southwestern Power Administration site environmental report for calendar year 1995. Annual progress report, January 1, 1995--December 31, 1995  

DOE Green Energy (OSTI)

During CY 95, Southwestern was not involved in any programs that had a direct effect on the environment. Involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received two DOe audits, March 1991 and 1993. Southwestern has worked diligently on the DOE approved action plan and has completed the required effort. The audits provided the secretary, DOE headquarters, and Southwestern an indication of the status of southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. Senior management at southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the environmental, safety, health, and security office. And the establishment of environmental and safety appointed representatives at various field locations.

NONE

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Annual report to the President and the Congress on the State Energy Conservation Program for calendar year 1989  

SciTech Connect

The Department is required by Section 365(c) of Title 3, Part C, of the Energy Policy and Conservation Act (EPCA), 42 U.S.C. 6321-6327, as amended by Title 4, Part B of the Energy Conservation and Production Act (ECPA), to report annually to the President and the Congress on the operation of the State Energy Conservation Program. The report is to include an estimate of the energy conservation achieved, and the degree of state participation and achievement as well as a description of innovative conservation programs undertaken by individual states. Together the EPCA and the ECPA constitute the State Energy Conservation Program (SECP) which has provided the states (any one of the 50 states, the District of Columbia, Puerto Rico, and the Territories and possessions of the United States) with funding to help establish and maintain their capability to plan, design, implement and coordinate a variety of programs and initiatives designed to promote energy conservation and efficiency at state and local levels. All states have operational programs funded under EPCA (no monies have been appropriated under ECPA since FY 1981). In addition, the majority of states have augmented the SECP with oil overcharge funding they have received over the past several years. Each state is required to provide a twenty-percent match for the Federal funds received, and its Base Plan must include the following program measures: (1) mandatory lighting efficiency standards for state public buildings; (2) programs to promote the availability and use of carpool, vanpool, and public transportation; (3) mandatory standards and policies relating to energy efficiency to govern the state procurement practices; (4) mandatory thermal efficiency standards and insulation requirements for new and renovated buildings; and (5) a traffic law or regulation, which permits the operator of a motor vehicle to turn right at a red stop light after stopping. 6 tabs.

Not Available

1990-12-01T23:59:59.000Z

262

UNITED STATES Calendar Year 2004  

E-Print Network (OSTI)

Coke 2.8 Electricity 39.0 Charcoal 1.8 Ethyl Alcohol 3.1 Petroleum Derivatives 35.2 Other Secondaries 0 to respond to the needs with reasonable costs and environmental impact. Among the options for the expansion will be the least-cost solution for this expansion and the net change in CO2 emissions? The answer

US Army Corps of Engineers

263

UNITED STATES Calendar Year 2004  

E-Print Network (OSTI)

, upgrading, and refining processes, at a cost, but there is so little demand for petroleum products which) gasoline c) diesel d) heavy fuel oil e) petroleum coke and f) other petroleum products. The physical flows products (gasoline, diesel) with weak demand growth for others (e.g. heavy oil, petroleum coke

US Army Corps of Engineers

264

UNITED STATES Calendar Year 2005  

E-Print Network (OSTI)

% Energy Efficiency 16% Geothermal Petroleum & Pet Coke of regulation and carbon cost in the Council's Plan, the Council is also required to consider environmental costs more broadly. This presentation is intended to provide a foundation of facts from which discussion

US Army Corps of Engineers

265

UNITED STATES Calendar Year 2006  

E-Print Network (OSTI)

Nuclear Other renewables Petroleum coke Other gases and other fuels Coal Petroleum Hydro ChangeDetection and advanced stimulation ­ Slow decline curves ­ Reduce drilling (fewer rigs, lower costs, smaller footprint, CEE/BEG/JSG/UT Not All Producers are the Same $10 $12 10% Return U.S. 2010 Cash Operating Costs

US Army Corps of Engineers

266

UNITED STATES Calendar Year 2003  

E-Print Network (OSTI)

Engineering Department, King Fahd UniVersity of Petroleum & Minerals, Dhahran 31261, Saudi Arabia 1 with toluene. Thus, these processes offer a way to utilize the low-cost toluene and TMB to produce the much to having total constant pressure since the total number of moles remains constant. Coke deposited on spent

US Army Corps of Engineers

267

UNITED STATES Calendar Year 2003  

E-Print Network (OSTI)

, upgrading, and refining processes, at a cost, but there is so little demand for petroleum products which) gasoline c) diesel d) heavy fuel oil e) petroleum coke and f) other petroleum products. The physical flows products (gasoline, diesel) with weak demand growth for others (e.g. heavy oil, petroleum coke

US Army Corps of Engineers

268

Annual Report Calendar Year 2010  

E-Print Network (OSTI)

be ionized and separated into molecules, and molecular formulas can be computed by ESI/ICRMS. The Chelsea] White A, Handler P, Smith EL. Principles of biochemistry. 3rd ed. New York: McGraw-Hill, 1964. [44 and Soils. Chelsea, MI: Lewis Publishers, 1991, 3-22. [48] Leenheer JA, Rostad CE. Fractionation

269

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 8 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

270

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, August 27 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

271

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 28 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

272

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev April 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 14 1 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 2 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 3 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 4 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 5 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 6 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day)

273

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 9 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

274

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 17 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

275

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 1 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

276

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 29 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

277

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of February 3 2014 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 3 4 5 6 7 8 9 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

278

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 7 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

279

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 10 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

280

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, August 6 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 31 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

282

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 14 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

283

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev March 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 9 1 2 3 10 4 5 6 7 8 9 10 11 11 12 13 14 15 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 16 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 17 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 12 18 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 19 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 20 LEED Certification Training & Attaintment

284

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of September 2 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 2 3 4 5 6 7 8 All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST

285

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 30 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

286

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, January 1 2014 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

287

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Monday, September 2 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

288

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of January 1 2014 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31 1 2 3 4 5 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

289

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Monday, August 5 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

290

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of July 29 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 29 30 31 1 2 3 4 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

291

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 16 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

292

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Sunday, August 18 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

293

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 15 2013 Next » Time Items All day 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

294

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, September 3 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

295

Diversity Events Calendar  

Energy.gov (U.S. Department of Energy (DOE))

Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at...

296

Calendars | User Information | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Information: Calendars APS User Calendar Important meetings and general events of interest to the user community. General User Proposal (GUP) Calendar Deadlines, notification...

297

Evaluation of Calendar Year 1997 Groundwater and Surface Water Quality Data For The Chestnut Ridge Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This report presents an evaluation of the groundwater monitoring data obtained in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) during calendar year (CY) 1997. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge bordered by the U.S. Department of Energy (DOE) Y-12 Plant in Bear Creek Valley (BCV) to the north, Scarboro Road to the eas~ Bethel Valley Road to the south, and an unnamed drainage basin southwest of the Y-12 Plant (Figure 1). Groundwater quality monitoring is performed at hazardous and nonhazardous waste management facilities in the regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The CY 1997 monitoring data are presented in Calendar Year 1997 Annual Groundwater Monitoring Report for the Chestnut Ridge Hydrogeolo~"c Regime at the US. Department of Energy Y-12 Plant, Oak Ridge, Tennessee (MA Technical Services, Inc. 1998), which also presents results of site-specific monitoring data evaluations required under the Resource Conservation and Recovery Act (RCIL4) post-closure permit (PCP) for the Chestnut Ridge Regime

Jones, S.B.

1998-09-01T23:59:59.000Z

298

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev August 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 31 1 2 3 4 32 5 6 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 7 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 8 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 9 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 10 11 33 12 13 14 15 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 16 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST

299

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 5 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 5 6 7 8 9 10 11 All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013

300

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev July 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 27 1 2 3 4 5 6 7 28 8 9 10 11 12 13 14 29 15 16 17 18 19 20 21 30 22 23 24 25 26 27 28 31 29 30 31 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev September 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 35 1 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 36 2 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 3 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 4 5 6 7 8 37 9 ICCE 2013: International Conference & Exhibition on Clean Energy 9 Sep 2013 (All day) - 11 Sep 2013 (All day) 10 ICCE 2013: International Conference & Exhibition on Clean Energy

302

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 12 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 12 13 14 15 16 17 18 Before 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013

303

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 26 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 26 27 28 29 30 31 1 All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00

304

Mobile digital calendars in knowledge work  

Science Conference Proceedings (OSTI)

This article investigates the usage of mobile digital-calendar solutions in a knowledge work setting through the means of an empirical survey (n = 220) among managers and experts in a global telecommunications company. It is indicated, that the mobile digital ... Keywords: PIM, calendar use, digital calendars, electronic calendaring, electronic scheduling, global telecommunications, knowledge work, mobile calendars, mobile communications, mobile computing, personal information management

Anna Sell

2008-08-01T23:59:59.000Z

305

Fermi Large Area Telescope Operations: Progress Over 4 Years  

SciTech Connect

The Fermi Gamma-ray Space Telescope was launched into orbit in June 2008, and is conducting a multi-year gamma-ray all-sky survey, using the main instrument on Fermi, the Large Area Telescope (LAT). Fermi began its science mission in August 2008, and has now been operating for almost 4 years. The SLAC National Accelerator Laboratory hosts the LAT Instrument Science Operations Center (ISOC), which supports the operation of the LAT in conjunction with the Mission Operations Center (MOC) and the Fermi Science Support Center (FSSC), both at NASA's Goddard Space Flight Center. The LAT has a continuous output data rate of about 1.5 Mbits per second, and data from the LAT are stored on Fermi and transmitted to the ground through TDRS and the MOC to the ISOC about 10 times per day. Several hundred computers at SLAC are used to process LAT data to perform event reconstruction, and gamma-ray photon data are subsequently delivered to the FSSC for public release with a few hours of being detected by the LAT. We summarize the current status of the LAT, and the evolution of the data processing and monitoring performed by the ISOC during the first 4 years of the Fermi mission, together with future plans for further changes to detected event data processing and instrument operations and monitoring.

Cameron, Robert A.; /SLAC

2012-06-28T23:59:59.000Z

306

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev 2013 Next » January M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 February M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 March M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 May M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 June M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 July M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

307

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1991. Report to Congress in response to Public Law 99-240  

SciTech Connect

This is the sixth report submitted to Congress under section 5(d)(2)(E)(ii)(II) of the Low-Level Radioactive Waste Policy Act of 1985 (the Act). This section of the Act directs the Department of Energy (DOE) to summarize the annual expenditures of funds disbursed from the DOE surcharge escrow account and to assess compliance of these expenditures with the limitations specified in the Act. In addition to placing limitations on the use of these funds, the Act also requires the nonsited compact regions and nonmember States to provide DOE with an itemized report of their expenditures on December 31 of each year in which funds are expended. Within 6 months after receiving the individual reports, the Act requires the Secretary to furnish Congress with a summary of the reported expenditures and an assessment of compliance with the specified usage limitations. This report fulfills that requirement. DOE disbursed funds totaling $15,037,778.91 to the States and compact regions following the July 1, 1986, January 1, 1988, and January 1, 1990, milestones specified in the Act. Of this amount, $3,517,020.56 was expended during calendar year 1991 and $6,602,546.24 was expended during the prior 5 years. At the end of December 1991, $4,918,212.11 was unexpended. DOE has reviewed each of the reported expenditures and concluded that all reported expenditures comply with the spending limitations stated in section 5(d)(2)(E)(i) of the Act.

Not Available

1992-06-01T23:59:59.000Z

308

This is the first annual report of the Oak Ridge National Laboratory Neutron Sciences Directorate for calendar year 2007. It describes the neutron science  

E-Print Network (OSTI)

Welcome 6 Neutron Primer 7 ORNL Neutron Sciences 8 HFIR and SNS 9 Year in Review 16 Science Highlights 36. With HFIR and SNS operating, ORNL now has two of the world's best neutron facilities and the opportunity facilities. At HFIR, the year began with the reactor in shutdown mode and work on the new cold source

309

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5, September 2002 Gary A five years of a multi-year remote sensing study in the Chicago area, with measurements made as to the extent I/M programs and #12;On-Road Remote Sensing in the Chicago Area: Year 5 2 special fuels contribute

Denver, University of

310

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4, January 2003 Daniel A year of a multi-year remote sensing study in the Denver area. The remote sensor used in this study channel was somewhat significant. #12;On-Road Remote Sensing in the Denver Area: Year 4 2 INTRODUCTION

Denver, University of

311

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1989: Report to Congress in response to Public Law 99-240  

SciTech Connect

This response is submitted in response to the Low-Level Radioactive Waste Policy Amendments Act of 1985 (the Act), Public Law 99-240. The report summarizes expenditures made during the calendar year 1989 of surcharge rebates from the July 1, 1986, milestones. Title I of the Act requires the Department of Energy (DOE) to administer a Surcharge Escrow Account. This account consists of a portion of the surcharge fees paid by generators of low-level radioactive waste in nonsited compacts (regional compacts currently without operating disposal sites) and nonmember States (States without disposal sites that are not members of compacts) to the three States with operating disposal facilities (Nevada, South Carolina, and Washington) (sited States) for using their disposal facilities. In administering the Surcharge Escrow Account, the Act requires DOE to: invest the funds in interest-bearing United States Government securities; determine eligibility of rebates of the funds by evaluating State and compact progress toward developing new disposal sites against milestones set forth in the Act; disburse the collected rebates and interest; assess compliance of rebate expenditures with the limitations prescribed in the Act; and submit a report annually to Congress summarizing rebate expenditures by States and regions. 5 tabs.

Not Available

1990-06-01T23:59:59.000Z

312

Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations  

Science Conference Proceedings (OSTI)

This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

G. B. Mitchem

2001-08-22T23:59:59.000Z

313

Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000  

Science Conference Proceedings (OSTI)

Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit [CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C.

K. B. Campbell

2001-06-01T23:59:59.000Z

314

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4, November 2002 Gary A conducted a five-day remote sensing study in the Phoenix, AZ area in the fall of 2002. The remote sensor #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4 2 by 5 years

Denver, University of

315

Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Unit [CAU] 404) (Figure 1) are described in Closure Report for Corrective Action Unit 404. Roller Coaster Sewage Lagoons and North Disposal Trench. Tonopah Test Range. Nevada, report number DOE/NV--187, September 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. As stated in Section 5.0 of the NDEP-approved CRY post-closure monitoring at CAU 404 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. In addition to the above activities, vegetative monitoring of the cover (a plant census) will be done in the first, third and fifth year following revegetation. (Vegetative monitoring will done in fiscal year 2001, and the results reported in the 2002 Post-Closure Inspection Report.) Site inspections were conducted on May 16, 2001, and November 6, 2001. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

316

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 4 2 EXECUTIVE SUMMARY The University of Denver has completed the first four years of a multi-year remote sensing

Denver, University of

317

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the second year of a five-year remote sensing study

Denver, University of

318

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022-8246 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the first three years of a five-year remote sensing

Denver, University of

319

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2 Sajal S. Pokharel Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted the second year of a five year remote sensing study

Denver, University of

320

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the third year of a multi-year remote sensing study

Denver, University of

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2 Peter J. Popp, Gary A Atlanta, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the first two years of a five-year remote sensing

Denver, University of

322

Niagara Falls Storage Site environmental report for calendar year 1992, 1397 Pletcher Road, Lewiston, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at the Niagara Falls Storage Site (NFSS) and provides the results for 1992. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues produced as a by-product of uranium production. All onsite areas of residual radioactivity above guidelines have been remediated. Materials generated during remediation are stored onsite in the 4-ha (10-acre) waste containment structure (WCS). The WCS is a clay-lined, clay-capped, and grass-covered storage pile. The environmental surveillance program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Several chemical parameters, including seven metals, are also routinely measured in groundwater. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Results of environmental monitoring during 1992 indicate that levels of the parameters measured were in compliance with all but one requirement: Concentrations of iron and manganese in groundwater were above NYSDEC groundwater quality standards. However, these elements occur naturally in the soils and groundwater associated with this region. In 1992 there were no environmental occurrences or reportable quantity releases.

Not Available

1993-05-01T23:59:59.000Z

323

Middlesex Sampling Plant environmental report for calendar year 1992, 239 Mountain Avenue, Middlesex, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at the Middlesex Sampling Plant (MSP) and provides the results for 1992. The site, in the Borough of Middlesex, New Jersey, is a fenced area and includes four buildings and two storage piles that contain 50,800 m{sup 3} of radioactive and mixed hazardous waste. More than 70 percent of the MSP site is paved with asphalt. The MSP facility was established in 1943 by the Manhattan Engineer District (MED) to sample, store, and/or ship uranium, thorium, and beryllium ores. In 1955 the Atomic Energy Commission (AEC), successor to MED, terminated the operation and later used the site for storage and limited sampling of thorium residues. In 1967 AEC activities ceased, onsite structures were decontaminated, and the site was certified for unrestricted use under criteria applicable at that time. In 1980 the US Department of Energy (DOE) initiated a multiphase remedial action project to clean up several vicinity properties onto which contamination from the plant had migrated. Material from these properties was consolidated into the storage piles onsite. Environmental surveillance of MSP began in 1980 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program. The environmental surveillance program at MSP includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-230, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analyses are performed to detect metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling th DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses.

Not Available

1993-05-01T23:59:59.000Z

324

Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Science Conference Proceedings (OSTI)

This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

Not Available

1993-05-01T23:59:59.000Z

325

Summary of expenditures of rebates from the low-level radioactive waste surcharge escrow account for calendar year 1993: Report to Congress  

SciTech Connect

This is the eighth report submitted to Congress in accordance with section 5(d)(2)(E)(ii)(II) of the Low-Level Radioactive Waste Policy Act (the Act). This section of the Act directs the Department of Energy (DOE) to summarize the annual expenditures of funds disbursed from the DOE surcharge escrow account and to assess compliance of these expenditures with the following limitations specified in the Act: establish low-level radioactive waste disposal facilities; mitigate the impact of low-level radioactive waste disposal facilities on the host State; regulate low-level radioactive waste disposal facilities; or ensure the decommissioning, closure, and care during the period of institutional control of low-level radioactive waste disposal facilities. In addition to placing these limitations on the use of these funds, the Act also requires all nonsited compact regions and nonmember States to provide DOE with an itemized report of their expenditures on December 31 of each year in which funds are expended. Within six months after receiving the individual reports, the Act requires the Secretary of Energy to furnish Congress with a summary of the reported expenditures and an assessment of compliance with the specified usage limitations. This report fulfills that requirement.

Not Available

1994-06-01T23:59:59.000Z

326

Post-Closure Inspection Report for Corrective Action Unit 426: Cactus Spring Waste Trenches Tonopah Test Range, Nevada Calendar Year 2000  

SciTech Connect

Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAW 426]) (Figure 1) are described in Closure Report for corrective Action Unit 426, Cactus Spring Waste Trenches. Tonopah Test Range, Nevada, report number DOE/NV--226. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. Post-closure monitoring at CAU 426 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

327

Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs.

1987-06-01T23:59:59.000Z

328

Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

1993-05-01T23:59:59.000Z

329

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6, January 2007 Gary A 80208 June 2007 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 1 EXECUTIVE SUMMARY The University of Denver conducted a three-day remote sensing study in the Denver, CO area

Denver, University of

330

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1 Gary A. Bishop, Sajal S-day remote sensing study in the Phoenix, AZ area in the fall of 1998. The remote sensor used in this study selected for 1999. On-Road Remote Sensing in the Phoenix Area: Year 1 2 #12;INTRODUCTION Many cities

Denver, University of

331

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1 Peter J. Popp, Gary A, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 1 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Chicago area in the fall

Denver, University of

332

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6, September 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing in the Chicago Area-year remote sensing study in the Chicago area, with measurements made in September of 1997 through 2000, 2002

Denver, University of

333

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2, September 2004 Gary A of the work. #12;On-Road Remote Sensing in the Omaha Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Omaha, Nebraska area in September of 2004. The remote

Denver, University of

334

2000 TMS Annual Meeting: Calendar of Events  

Science Conference Proceedings (OSTI)

2000 TMS Fall Meeting: Calendar of Events ... development, and application of new materials processes, analysis techniques, and equipment advances.

335

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2005 September 30, 2005 Inspection Report: IG-0703 Characterization Wells at Los Alamos National Laboratory September 30, 2005 Inspection Report: IG-0701 Electronic Recording of Telephone and Radio Conversations by Sandia Protective Force Management September 30, 2005 Audit Report: IG-0702 Use of Performance Based Incentives by the Office of Civilian Radioactive Waste Management September 27, 2005 Evaluation Report: IG-0700 The Department's Unclassified Cyber Security Program-2005 September 16, 2005 Audit Report: IG-0699 The Los Alamos National Laboratory Hydrodynamic Test Program September 9, 2005 Audit Report: IG-0698 Sludge Removal Operations at the Hanford Site's K Basins August 30, 2005 Audit Report: IG-0697 The National Nuclear Security Administration's Refurbishment of the B61

336

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 22, 2004 April 22, 2004 Audit Report: IG-0647 System Development Activities at Selected Management Contractors April 22, 2004 Audit Report: OAS-L-04-15 Audit of Disposition of Excess Facilities at the Hanford Site April 19, 2004 Audit Report: OAS-M-04-02 Management Controls Over Subcontract Administration by the National Renewable Energy Laboratory April 19, 2004 Audit Report: OAS-L-04-14 Review of Selected Issues Pertaining to Vapor Inhalation Allegations at the Hanford Site April 14, 2004 Audit Report: IG-0646 The National Nuclear Security Administration's Enhanced Surveillance Campaign April 13, 2004 Inspection Report: IG-0645 Contractor Compliance with Deemed Export Controls April 12, 2004 Special Report: IG-0644 Los Alamos National Laboratory's Purchase Card Program Corrective Actions

337

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 18, 2004 March 18, 2004 Audit Report: IG-0642 Depleted Uranium Hexafluoride Conversion March 17, 2004 Audit Report: OAS-L-04-11 Requests for Equitable Adjustment at the Rocky Flats Environmental Technology Site March 12, 2004 Audit Report: IG-0641 The Department's Basic Protective Force Training Program March 12, 2004 Audit Report: OAS-M-04-01 Management Controls Over Subcontract Administration by the Argonne National Laboratory February 24, 2004 Audit Report: IG-0640 Reestablishment of Enriched Uranium Operations at the Y-12 National Security Complex February 17, 2004 Audit Report: IG-0639 The Department's Audit Resolution Process February 9, 2004 Audit Report: IG-0638 Recovery of Highly Enriched Uranium Provided to Foreign Countries February 4, 2004 Audit Report: IG-0637 Electricity Transmission Scheduling at the Bonneville Power Administration

338

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 5, 2003 June 5, 2003 Inspection Report: IG-0605 National Nuclear Security Administration's Ability to Meet the Aircraft Requirements of the Joint Technical Operations Team June 4, 2003 Audit Report: IG-0603 International Materials Protection, Control and Accountability Nonproliferation Initiative June 3, 2003 Audit Report: IG-0602 Management of the Department's Protective Forces June 2, 2003 Inspection Report: IG-0604 Inspection of Savannah River Operations Office Management of Emergency Response and Law Enforcement-Related Grants May 27, 2003 Audit Report: IG-0601 Idaho National Engineering and Environmental Laboratory's Strategic Initiative Fund May 23, 2003 Audit Report: IG-0600 Oversight Funds Provided to Local Governments in the State of Nevada May 22, 2003 Audit Report: IG-0599

339

Calendar Year 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 13, 2008 March 13, 2008 Audit Report: IG-0789 Audit Report on Management of the Department's Publicly Accessible Websites February 28, 2008 Audit Report: IG-0788 Nanoscale Materials Safety at the Department's Laboratories February 28, 2008 Inspection Report: INS-O-08-01 Unauthorized Weapon Discharge and Related Security Policies and Procedures at Sandia National Laboratory-New Mexico February 21, 2008 Audit Letter Report: OAS-L-08-07 Analysis of Open Office of Inspector General Recommendations February 6, 2008 Audit Report: OAS-L-08-06 Federal Manager's Financial Integrity Act January 28, 2008 Audit Report: OAS-L-08-05 The Contact-Handled Transuranic Waste Characterization Capabilities at the Idaho National Laboratory January 28, 2008 Audit Report: OAS-L-08-04 Department's Implementation of the Strategic: Integrated Procurement

340

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 22, 2007 May 22, 2007 Inspection Report: INS-O-07-01 Review of Status of Prior Export Control Recommendations at the Departmentof Energy May 18, 2007 Audit Report: IG-0765 Voluntary Separation Program at the Idaho Cleanup Project May 4, 2007 Audit Report: IG-0764 Quality Assurance Standards for the Integrated Control Network at theHanford Site's Waste Treatment Plant April 26, 2007 Audit Report: OAS-M-07-03 Management Controls over Selected Facility Contractor Travel Expenses April 11, 2007 Audit Report: OAS-L-07-11 The Department of Energy's Community and Regulatory Support Funding at the Richland April 11, 2007 Audit Report: OAS-L-07-10 Audit of the Department of Energy's Community and Regulatory Support Funding at the Carlsbad Field Office March 30, 2007 Audit Report: IG-0763

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 25, 2007 October 25, 2007 Inspection Report: IG-0780 Work Order Estimate and Cost Issues for Site Support Services at Los AlamosNational Laboratory October 18, 2007 Audit Report: IG-0779 Selected Aspects of the East Tennessee Technology Park's Security Clearance Retention Process October 11, 2007 Audit Report: OAS-L-08-01 Follow-up on the Depleted Uranium Process Y-12 National Security Complex October 2, 2007 Inspection Report: IG-0778 Inspection Report on The Consolidated Terrorism Watchlist Nomination Process at the Department of Energy October 1, 2007 Audit Report: OAS-M-08-01 Management Controls over the Bonneville Power Administration's Personal Property Accountability September 28, 2007 Audit Letter Report: OAS-L-07-26 Department's Implementation of the Strategic Integrated Procurement

342

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 11, 2003 August 11, 2003 Inspection Report: IG-0615 Oversight of Shock Sensitive Chemicals at the Department's Ames Laboratory August 5, 2003 Audit Report: IG-0614 National Nuclear Security Administration's Planning, Programming, Budgeting, and Evaluation Process July 18, 2003 Audit Report: IG-0613 Disposal of Remote-Handled Transuranic Waste at the Waste Isolation Pilot Plant July 8, 2003 Audit Report: IG-0612 Disposal of the Rocky Flats Environmental Technology Site's Low-Level Mixed Waste July 7, 2003 Audit Report: IG-0611 Waste Reduction Plans for the Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory June 27, 2003 Special Inquiry: IG-0610 Federal Energy Regulatory Commission Communications June 25, 2003 Audit Report: IG-0609

343

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 20, 2003 November 20, 2003 Audit Report: OAS-L-04-05 Audit of Controls Over Expenditures Within the Office of Secure Transportation November 12, 2003 Special Report: IG-0626 Management Challenges at the Department of Energy November 7, 2003 Audit Report: OAS-L-04-04 Audit of the U.S. Large Hadron Collider Program November 4, 2003 Inspection Report: IG-0625 Reporting of Security Incidents at the Lawrence Livermore National Laboratory November 4, 2003 Audit Report: OAS-L-04-03 Audit of Accelerated Remediation of Tank Waste at Hanford October 23, 2003 Audit Report: IG-0624 Transuranic Waste Retrieval and Processing at the Hanford Site October 16, 2003 Audit Report: OAS-L-04-02 Waste Pits and Silos Remediation at the Femald Closure Project October 14, 2003 Audit Report: IG-0623

344

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 25, 2012 April 25, 2012 Audit Report: IG-0863 The Department of Energy's $12.2 Billion Waste Treatment and Immobilization Plant - Quality Assurance Issues - Black Cell Vessels April 23, 2012 Audit Report: OAS-RA-12-09 The Department of Energy's Energy Efficiency and Conservation Block Grant Program Funded under the American Recovery and Reinvestment Act for the City of Philadelphia April 23, 2012 Audit Report: OAS-L-12-05 The Joint Actinide Shock Physics Experimental Research Facility at the Nevada National Security Site April 19, 2012 Audit Report: OAS-RA-12-08 The Department of Energy's American Recovery and Reinvestment Act - New York State Energy Program April 19, 2012 Special Report: OAS-L-12-04 Questioned, Unresolved, and Potentially Unallowable Costs Incurred by Los

345

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 31, 2003 March 31, 2003 Inspection Report: IG-0594 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory March 20, 2003 Inspection Report: IG-0591 Allegations Concerning the Reporting of a Radiological Incident at the Los Alamos National Laboratory March 13, 2003 Audit Report: IG-0590 Refurbishment of the W80 - Weapon Type March 11, 2003 Audit Report: IG-0589 Transfer of Excess Personal Property From the Nevada Test Site to the Community Reuse Organization March 5, 2003 Audit Report: OAS-L-03-12 Department of Energy's Safety Bases for Nuclear Facilities March 3, 2003 Audit Report: IG-0588 Treatment of Mixed Incinerable Waste March 1, 2003 Inspection Report: IG-0592 Actions Taken in Response to Missing Hazardous Waste Containing Cyanide February 26, 2003

346

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 21, 2013 February 21, 2013 Examination Report: OAS-RA-13-13 Texas State Energy Conservation Office Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 February 19, 2013 Audit Report: IG-0881 National Nuclear Security Administration Contractor Governance February 19, 2013 Examination Report: OAS-RA-13-11 Fresno County Economic Opportunities Commission Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 February 19, 2013 Examination Report: OAS-RA-13-12 City of Los Angeles - Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 February 19, 2013 Examination Report: OAS-RA-13-09 North Carolina State Energy Office - Energy Efficiency and Conservation

347

Calendar Year 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 10, 2010 August 10, 2010 Audit Report: IG-0837 Nuclear Safety: Safety Basis and Quality Assurance at the Los Alamos National Laboratory August 4, 2010 Special Report: OAS-RA-10-15 Review of the Department of Energy's Plan for Obligating Remaining Recovery Act Contract and Grant Funding July 29, 2010 Special Report: OAS-SR-10-02 Resolution of Questioned, Unresolved and Potentially Unallowable Costs Incurred in Support of the YuccaMountain Project July 29, 2010 Inspection Report: INS-O-10-02 Severance Repayments at the Savannah River Site July 28, 2010 Letter Report: INS-L-10-02 Allegations Involving the National Nuclear Security Administration's National Security Vault July 22, 2010 Audit Report: OAS-RA-10-14 Management Controls over the Development and Implementation of the Office

348

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 4, 2006 August 4, 2006 Audit Report: OAS-L-06-16 The Department of Energy's Interaction with the National Coal Council August 4, 2006 Audit Report: OAS-M-06-06 Management Controls over Cesium and Strontium Capsule Disposition at the Hanford Site August 3, 2006 Inspection Report: IG-0735 Destruction of Classified Hard Drives at Sandia National Laboratory-New Mexico July 26, 2006 Inspection Report: IG-0734 Internal Controls for Excessing and Surplusing Unclassified Computers atLos Alamos National Laboratory July 19, 2006 Special Inquiry Report: SIR-0719 Special Inquiry Report Relating to the Department of Energy's Response to a Compromise of Personnel Data (OIG Case No. I061IG001) July 12, 2006 Special Report: IG-0733 Follow-Up Review of The Department of Energy's Response to Hurricanes

349

Calendar Year 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 15, 2008 July 15, 2008 Audit Report: IG-0798 Nuclear Weapons Programs Heavy Water Inventory July 14, 2008 Audit Report: OAS-M-08-09 Management Controls over Monitoring and Closeout of Small Business Innovation Research Phase II Grants July 2, 2008 Audit Report: OAS-M-08-08 Management Controls over Small Business Opportunities at Oak Ridge National Laboratory July 2, 2008 Audit Report: IG-0797 Implementation of Integrated Safety Management at Lawrence Livermore National Laboratory July 1, 2008 Inspection Report: IG-0796 Internal Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements June 24, 2008 Audit Report: OAS-L-08-14 Bonneville Power Administration's Aviation Management Program June 3, 2008 Audit Report: OAS-L-08-13 Certification and Accreditation of The Office of Science National Security

350

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 18, 2012 June 18, 2012 Audit Report: IG-0867 National Nuclear Security Administration Contractors' Disability Compensation and Return-to-Work Programs May 31, 2012 Audit Report: IG-0866 Integrated Safety Management at Sandia National Laboratories May 25, 2012 Audit Report: IG-0865 Efforts by the Department of Energy to Ensure Energy-Efficient Management of its Data Centers May 22, 2012 Audit Report: OAS-RA-12-12 The Department of Energy's Clean Cities Alternative Fuel Vehicle Grant Program Funded under the American Recovery and Reinvestment Act May 21, 2012 Inspection Report: INS-L-12-03 Alleged Health and Wellness Benefit Irregularities by a Department Contractor May 17, 2012 Management Alert: IG-0864 Extended Assignments at Princeton Plasma Physics Laboratory May 10, 2012

351

Calendar Year 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 27, 2010 April 27, 2010 Audit Report: OAS-RA-10-08 The Department of Energy's Program to Assist Federal Buyers in the Purchasing of Energy Efficient Products April 27, 2010 Audit Letter Report: OAS-RA-L-10-04 Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act April 23, 2010 Audit Letter Report: OAS-RA-L-10-03 Audit of Moab Mill Tailings Cleanup Project April 16, 2010 Audit Letter Report: OAS-RA-L-10-02 Audit of Fermi National Accelerator Laboratory's NOvA Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah River Site Depleted Uranium Oxides April 6, 2010 Audit Letter Report: OAS-RA-L-10-01 The Department of Energy's Management of the NSLS-II Project

352

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 19, 2004 August 19, 2004 Audit Report: OAS-M-04-06 Report On Management Controls Over Subcontract Administration at the National Security Laboratories August 16, 2004 Audit Report: IG-0659 The Stabilization of Nuclear Materials at Los Alamos National Laboratory August 12, 2004 Audit Report: OAS-L-04-19 Interim Report on Audit of "The Department's Implementation of I-MANAGE STARS" August 11, 2004 Inspection Report: IG-0658 Protective Force Response to a Security Incident at Sandia National Laboratory, California August 11, 2004 Audit Report: IG-0657 The Department's Continuity Planning and Emergency Preparedness August 10, 2004 Inspection Report: IG-0656 Internal Controls Over Personal Computers at Los Alamos National Laboratory August 3, 2004 Audit Report: OAS-M-04-05

353

Calendar Year 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2010 September 15, 2010 Audit Letter Report: OAS-RA-L-10-06 The Department of Energy's American Recovery and Reinvestment Act- Georgia State Energy Program September 14, 2010 Special Report: OAS-SR-10-03 Department's Freedom of Information Act Request Process September 8, 2010 Audit Report: OAS-L-10-10 The Audit of Precious Metals at NNSA Sites September 3, 2010 Audit Report: DOE/IG-0838 Follow-up Audit on Retention and Management of the Department of Energy's Electronic Records August 27, 2010 Audit Letter Report: OAS-RA-L-10-09 Office of Science's Energy Frontier Research Centers August 23, 2010 Audit Report: OAS-L-10-08 National Nuclear Security Administration's Contracts for the Down-Blending of Highly Enriched Uranium August 16, 2010 Inspection Report: INS-O-10-03

354

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 30, 2006 October 30, 2006 Audit Report: IG-0744 Follow-up Audit on Stockpile Surveillance Testing October 18, 2006 Audit Letter Report: INS-L-07-0 1 Drug Testing For Security Positions at DOE's Portsmouth and PaducahSites" (S051S036) October 18, 2006 Audit Report: OAS-L-07-02 Emergency Response Training at Lawrence Livermore National Laboratory October 18, 2006 Audit Report: IG-0743 Remediation of the Waste Burial Grounds at the Hanford Site October 12, 2006 Audit Letter Report: OAS-L-07-01 The Bonneville Power Administration's Conservation and Renewables Discount Conservation and Rate Credit Programs October 11, 2006 Inspection Report: IG-0742 Protective Force Property Management at Lawrence Livermore National Laboratory October 10, 2006 Inspection Report: IG-0741 Concerns With Security Barriers at theY-12 National Security Complex

355

Calendar Year 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 14, 2010 October 14, 2010 Audit Report: OAS-RA-11-01 The State of Illinois Weatherization Assistance Program October 7, 2010 Audit Report: IG-0842 Report on Critical Asset Vulnerability and Risk Assessments at the Power Marketing Administrations--Followup Audit September 30, 2010 Audit Report: IG-0841 The Department's Information Technology Capital Planning and Investment Control Activities September 30, 2010 Audit Report: OAS-L-10-09 Subcontract Auditing at Lawrence Livermore National Laboratory September 29, 2010 Audit Report: OAS-RA-10-18 Management Controls over the Department of Energy's American Recovery and Reinvestment Act - Michigan State Energy Program September 23, 2010 Audit Report: IG-0840 The Department of Energy's Audit Resolution and Follow-up Process September 22, 2010

356

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2005 April 15, 2005 Audit Report: IG-0685 The Retention and Management of the Department's Records April 14, 2005 Audit Report: IG-0684 Deactivating and Decommissioning Facilities at the Savannah River Site March 31, 2005 Audit Report: OAS-L-05-04 Review of the Department's Controls over Services Acquired through Memoranda of Agreement with Other Federal Agencies and Blanket Purchase Agreements March 30, 2005 Audit Report: OAS-L-05-05 Audit of the Spallation Neutron Source Project March 29, 2005 Special Report: IG-0683 Fast Flux Test Reactor: Re-evaluation of the Department's Approach to Deactivation, Decontamination, and Decommissioning March 24, 2005 Inspection Report: IG-0682 The Department of Energy's Review of Chemical and Biological Export License Applications March 24, 2005

357

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 9, 2006 February 9, 2006 Audit Report: OAS-L-06-07 The Department's Management of United States Enrichment Corporation Site Services February 8, 2006 Audit Report: OAS-M-06-04 Management Controls over BWXT's Teaming Partner Arrangement at Pantex February 2, 2006 Inspection Report: IG-0719 Protective Force Contracts at the Oak Ridge Reservation January 30, 2006 Audit Report: IG-0718 Management of the Department's Desktop Computer Software Enterprise License Agreements January 24, 2006 Inspection Report: IG-0717 Electronic Recording of Telephone and Radio Conversations by Los Alamos National Laboratory Protective Force Management January 19, 2006 Inspection Report: IG-0716 Security Clearance Terminations and Badge Retrieval at the Lawrence Livermore National Laboratory January 12, 2006

358

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2007 July 12, 2007 Investigation Memorandum: OIG Case No. I07AL011 Investigation of Alleged False Certifications Relating to Testing of the Contingency Protective Force at the Pantex Plant, OIG Case No. I07AL011 July 11, 2007 Audit Letter Report: INS-L-07-07 Alleged Unneccessary Protecitve Force Equipment Purchases at Pantex July 9, 2007 Audit Report: OAS-L-07-14 Agreed-Upon Procedures for Federal Payroll June 29, 2007 Inspection Report: IG-0769 Management of the Workers Compensation Program at Department of Energy Headquarters June 22, 2007 Audit Report: IG-0768 Facility Contractor Acquisition and Management of Information Technology Hardware June 19, 2007 Special Report: IG-0767 Expansion of the Strategic Petroleum Reserve June 4, 2007 Audit Report: OAS-M-07-04 Follow-Up Audit of the National Nuclear Security Administration's

359

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 19, 2003 February 19, 2003 Audit Report: OAS-L-03-10 Audit of the Research and Development Investment Criteria for Fossil Energy February 12, 2003 Inspection Report: S021S013 Inspection Report to Management on Inspection of 2001 Safeguards and Security Survey of Los Alamos National Laboratory February 12, 2003 Inspection Report: IG-0585 Inspection of Implementation of Corrective Actions Resulting From Force-on-Force Performance Tests February 1, 2003 Annual Performance Plan: IG-APP-005 Planning for and Measuring Office of Inspector General Results FY 2002 Annual Performance Report and FY 2003 Annual Performance Plan January 28, 2003 Special Inquiry: IG-0584 Operations at Los Alamos National Laboratory January 27, 2003 Audit Report: IG-0583 Management of Beryllium Metal Supply

360

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 18, 2007 September 18, 2007 Evaluation Report: IG-0776 The Department's Unclassified Cyber Security Program - 2007 September 17, 2007 Audit Report: OAS-M-07-06 Management Controls over the Hanford Environmental Information System September 12, 2007 Audit Letter Report: OAS-L-07-24 Use of External Independent Reviews at Environmental Management Sites September 12, 2007 Audit Report: IG-0775 National Nuclear Security Administration's Construction of aRadiological/Nuclear Complex for Homeland Security September 7, 2007 Inspection Report: IG-0774 Material Control and Accountability at Los Alamos National Laboratory August 20, 2007 Special Report: OAS-M-07-05 National Security Technologies, LLC Internal Audit Implementation Design August 17, 2007 Audit Report: IG-0773 Confirmatory Bioassay Testing at Selected Sites

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 30, 2004 June 30, 2004 Audit Report: IG-0653 Management of Oak Ridge Radio Transition Projects June 30, 2004 Audit Report: IG-0652 Management of the Federal Energy Regulatory Commission's Information Technology Program June 18, 2004 Audit Report: IG-0651 Audit Report on Management of the Department's Personnel Security and Access Control Information Systems June 14, 2004 Inspection Report: IG-0650 Internal Controls Over Methamphetamine Precursor Chemicals at the Y-12 National Security Complex and the Oak Ridge National Laboratory June 1, 2004 Investigation Report: I04RL003 Investigation of Allegations Involving Occupational Medical Services and Tank Farm Vapor Exposures at the Hanford Site May 25, 2004 Audit Report: IG-0649 Major Clean-up Projects at the Idaho National Engineering and Environmental

362

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 24, 2004 September 24, 2004 Audit Report: OAS-L-04-21 Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program - 2004" September 24, 2004 Evaluation Report: IG-0662 Evaluation Report on "The Department's Unclassified Cyber Security Program - 2004 September 23, 2004 Audit Report: OAS-L-04-23 Audit of the National Nuclear Security Administration's Tritium Production Plan Administrator, National Nuclear Security Administration September 22, 2004 Audit Report: OAS-M-04-07 Management Controls over Contractor Tuition Reimbursements for Courses Leading to Degrees at Non-Accredited Educational Institutions September 22, 2004 Audit Report: OAS-L-04-22 Completion of the Terascale Simulation Facility Project September 14, 2004 Audit Report: IG-0661

363

Calendar Year 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 30, 2008 October 30, 2008 Audit Report: IG-0803 Management of the Department's Data Centers at Contractor Sites September 30, 2008 Audit Report: OAS-L-08-17 Special Review on "Petroleum-Based Fuels Use" September 17, 2008 Evaluation Report: IG-0802 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2008 September 16, 2008 Evaluation Report: IG-0801 The Department's Unclassified Cyber Security Program - 2008 September 5, 2008 Inspection Report: INS-L-08-06 Sandia National Laboratory-New Mexico Student Intern Safety Training August 18, 2008 Audit Report: OAS-L-08-16 Agreed-Upon Procedures for Federal Payroll August 11, 2008 Audit Report: IG-0800 Certification and Accreditation of the Department's National Security Information Systems August 7, 2008

364

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 6, 2007 March 6, 2007 Audit Report: IG-0760 The Department's Wildland Fire Planning and Preparation Efforts March 5, 2007 Inspection Report: IG-0759 Excessing of Computers Used for Unclassified Controlled Information at Lawrence Livermore National Laboratory February 27, 2007 Audit Report: OAS-L-07-08 Design of the Engineered Barrier System at the Yucca Mountain Site February 22, 2007 Audit Report: IG-0758 The National Nuclear Security Administration's Implementation of the Federal Information Security Management Act February 21, 2007 Audit Report: OAS-L-07-07 Device Assembly Facility Utilization February 20, 2007 Audit Report: OAS-M-07-02 Management Controls over the National Nuclear Security Administration's Ability to Maintain Capability of the TA-18 Mission February 16, 2007

365

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 20, 2006 September 20, 2006 Audit Report: IG-0739 Performance-Based Contract Incentives at the Hanford Site September 18, 2006 Evaluation Report: IG-0738 The Department's Unclassified Cyber Security Program-2006 September 12, 2006 Audit Report: OAS-M-06-09 Follow-up on the Management of Plutonium-239 Sealed Sources Recovery Activities September 7, 2006 Audit Report: OAS-L-06-19 Department's Hydrogen Projects September 6, 2006 Audit Report: IG-0737 Beryllium Controls at the Oak Ridge National Laboratory August 24, 2006 Audit Report: OAS-M-06-08 Management Controls over Small Business Opportunities at Livermore NationalLaboratory August 24, 2006 Audit Report: OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract August 21, 2006 Audit Report: OAS-L-06-18

366

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 8, 2005 August 8, 2005 Audit Report: OAS-L-05-12 Audit Report on "Limited Life Component Exchange Program" July 29, 2005 Audit Report: OAS-L-05-10 Agreed-Upon Procedures for Federal Payroll July 29, 2005 Audit Report: IG-0696 Use of Oversight Funds by the State of Nevada and Affected Units of Local Government July 27, 2005 Inspection Report: IG-0695 Coordination of Biological Select Agent Activities at Department of Energy Facilities July 8, 2005 Audit Report: IG-0692 Management of Fossil Energy Cooperative Agreements June 24, 2005 Inspection Report: IG-0694 Protective Force Training at the Department of Energy's Oak Ridge Reservation June 17, 2005 Inspection Report: IG-0693 Review of Security at the Strategic Petroleum Reserve June 16, 2005 Audit Report: OAS-L-05-08

367

Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1992. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, only the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded, on occasion only, the fecal and total coliform concentration limits at the discharge point. This was later attributed to off-site Contractor Laboratory quality assurance problems. The environmental monitoring data has continued to demonstrate, besides the site specific contamination of ground water and soil resulting from past operations, that compliance was achieved with environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

1993-05-01T23:59:59.000Z

368

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2005 Inspection Report: IG-0671 Concerns Regarding the Department of Energy's Counterintelligence Inspection Program (U) January 11, 2005 Audit Report: OAS-L-05-02 I-MANAGE...

369

Calendar Year 1995 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Material at Richland Operations 1995-08-03 - Report ER-B-95-06: Audit of Work Force Restructuring at the Oak Ridge Operations Office 1995-08-03 - Report IG-0377: Report on...

370

Site Environmental Report for Calendar Year 2010  

E-Print Network (OSTI)

-17 December 2004 Numerical Simulation of Heat and Mass Transfer in a Natural Draft Wet Cooling Tower N draft wet cooling tower using the com- mercial CFD package Fluent has been conducted. The wa- ter droplets in the spray and rain zones are represented with droplet trajectories written in Lagrangian form

Kemner, Ken

371

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 9, 2009 Audit Report: IG-0810 Potential Uses for Depleted Uranium Oxide January 8, 2009 Inspection Report: IG-0809 Pantex Laser Perimeter Awareness System...

372

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 22, 2004 Audit Report: OAS-L-04-08 Maintenance Activities at the Y-12 National Security Complex January 21, 2004 Audit Report: OAS-L-04-09 Department of Energy's...

373

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2009 Inspection Letter Report: INS-L-09-03 Y- 12 National Security Complex Accountable Classified Removable Electronic Media Program March 6, 2009 Audit Letter Report:...

374

Calendar Year 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alleged Procurement Irregularities Relating to the Clean CoalPower Initiative Gilberton Coal-to-Clean Fuels and Power Project May 3, 2010 Audit Report: OAS-RA-10-09 Management...

375

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 18, 2006 Inspection Report: IG-0724 Badge Retrieval and Security Clearance Termination at Sandia National Laboratory-New Mexico April 10, 2006 Audit Report: OAS-L-06-12...

376

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 18, 2013 Audit Report: OAS-RA-13-28 Costs Incurred by Selected Tribal Energy Efficiency and Conservation Block Grant Recipients July 18, 2013 Inspection Report: INS-O-13-04...

377

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 28, 2013 Examination Report: OAS-RA-13-17 Community Action Partnership of San Bernardino County - Weatherization Assistance Program Funds Provided by the American Recovery...

378

Elk Monitoring Report for Calendar Year 2012  

SciTech Connect

Four complete surveys were conducted during 2012. The surveys were conducted on April 5, June 19, October 25, and December 18. During the first survey, conducted on April 5, the aerial survey crew detected 26 elk while the ground survey crew detected zero. For the June 19 survey, the aerial survey detected four elk not detected by the ground crew, while the ground crew detected 13 elk not detected by the aerial crew. A total of 17 elk were detected on June 19, 2012. On October 25, surveyors detected two herds of elk. Both the aerial and ground crews detected one herd of six, while only the ground crew detected the other herd of four. No elk were observed during the final survey, conducted on December 18.

Lindsey, Cole T.; Nugent, John J.; Wilde, Justin W.; Tiller, B

2013-03-12T23:59:59.000Z

379

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 13, 2007 August 13, 2007 Audit Report: OAS-L-07-19 Executive Compensation at Selected Office of Science Sites August 13, 2007 Audit Report: OAS-L-07-18 Executive Compensation at Brookhaven National Laboratory August 13, 2007 Audit Report: OAS-L-07-17 Executive Compensation at Argonne National Laboratory August 7, 2007 Audit Report: OAS-L-07-16 Audit of Contract Transition Activities at Los Alamos NationalLaboratory July 31, 2007 Summary of Audit Report: IG-0772 The National Nuclear Security Administration's Management of Classified Weapons Parts July 30, 2007 Audit Report: IG-0771 Security Over Personally Identifiable Information July 23, 2007 Inspection Report: INS-O-07-03 Protective Force Overtime Pay at Lawrence Livermore National Laboratory July 20, 2007 Inspection Report: IG-0770

380

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2003 Inspection Report: IG-0597 Inspection of Internal Controls Over Personal Computers at Los Alamos National Laboratory April 22, 2003 Audit Report: OAS-L-03-13 Audit of...

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

300 Area D4 Project Fiscal Year 2010 Building Completion Report  

SciTech Connect

This report summarizes the deactiviation, decontamination, decommissioning, and demolition activities of facilities in the 300 Area of the Hanford Site in fiscal year 2010.

Skwarek, B. J.

2011-01-27T23:59:59.000Z

382

A Good Year for Solar in Phoenix Area | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Good Year for Solar in Phoenix Area A Good Year for Solar in Phoenix Area A Good Year for Solar in Phoenix Area October 8, 2010 - 3:33pm Addthis A Good Year for Solar in Phoenix Area Stephen Graff Former Writer & editor for Energy Empowers, EERE Suntech opens solar panel manufacturing plant in Goodyear, Arizona Will create up to 150 jobs by 2013; production capacity of 30 MW annually 7th solar plant this year in Phoenix area because of new state tax incentive A ribbon cutting Friday at a new solar plant in Goodyear, Ariz., marked the creation of another 75 green manufacturing jobs for the area and the first U.S. plant from the world's largest photovoltaic manufacturer, Suntech Power. Governor Jan Brewer, along with local officials and corporate leaders, including Goodyear's economic-development director Paula Ilardo, was

383

A Good Year for Solar in Phoenix Area | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Good Year for Solar in Phoenix Area A Good Year for Solar in Phoenix Area A Good Year for Solar in Phoenix Area October 8, 2010 - 3:33pm Addthis A Good Year for Solar in Phoenix Area Stephen Graff Former Writer & editor for Energy Empowers, EERE Suntech opens solar panel manufacturing plant in Goodyear, Arizona Will create up to 150 jobs by 2013; production capacity of 30 MW annually 7th solar plant this year in Phoenix area because of new state tax incentive A ribbon cutting Friday at a new solar plant in Goodyear, Ariz., marked the creation of another 75 green manufacturing jobs for the area and the first U.S. plant from the world's largest photovoltaic manufacturer, Suntech Power. Governor Jan Brewer, along with local officials and corporate leaders, including Goodyear's economic-development director Paula Ilardo, was

384

Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128  

SciTech Connect

This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.

Elvado Environmental

2008-02-01T23:59:59.000Z

385

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 Mitchell J. Williams 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

386

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

387

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

388

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3, October 2003 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the La Brea Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the La

Denver, University of

389

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1 Peter J. Popp, Sajal S Center Parkway Atlanta, Georgia 30346 CRC Project No. E-23-4-99 #12;On-Road Remote Sensing in the Denver-year remote sensing study in the Denver area. The remote sensor used in this study is capable of measuring

Denver, University of

390

CALENDAR OF EVENTS  

Science Conference Proceedings (OSTI)

Feb 28, 2006 ... Bridge Hall, Level 1. TMS MEMBERSHIP AREA. 11 a.m. to 6 p.m.. C. Outside Exhibit Hall C, Level 1. TMS PUBLICATIONS SALES. 11 a.m. to 6...

391

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3 (Riverside) Sajal S., Suite 140 Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area sensing study in the Los Angeles, CA area. The remote sensor used in this study is capable of measuring

Denver, University of

392

Joint Outreach Task Group Calendar: September 2013  

Energy.gov (U.S. Department of Energy (DOE))

Joint Outreach Task Group (JOTG)has created a monthly calendar of community events to facilitate interagency and community involvement in these events. September 2013

393

NIST: A Walk Through Time - Ancient Calendars  

Science Conference Proceedings (OSTI)

... The earliest Egyptian calendar [Ref.] was based on the moon's cycles, but later the Egyptians realized that the "Dog Star" in Canis Major, which we ...

2010-10-05T23:59:59.000Z

394

NETL - ARRA Training Centers Course Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ARRA Training Centers Course Calendar The Regional Carbon Sequestration Training Centers, funded by the American Recovery and Reinvestment Act of 2009 (ARRA), support the...

395

EventMinder : a personal calendar assistant that understands events  

E-Print Network (OSTI)

Calendar applications do not understand calendar entries. This limitation prevents them from offering the range of assistance that can be provided by a human personal assistant. Understanding calendar entries is a difficult ...

Smith, Dustin Arthur

2007-01-01T23:59:59.000Z

396

Track NERSC Scheduled and Unscheduled Outages in Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Track NERSC Outages in Google Calendar Track NERSC Outages in Google Calendar March 22, 2013 by Jack Deslippe (0 Comments) Outages are now available in Google calendar form. You...

397

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5, November 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Phoenix, AZ area in the fall of 2004. The remote sensor used in this study

Denver, University of

398

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5, January 2005 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Denver, CO area in the winter of 2005. The remote sensor used in this study

Denver, University of

399

Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011  

SciTech Connect

As a condition to the Disposal Authorization Statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year 2011 annual review for Area G. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 and formally approved in 2009. These analyses are expected to provide reasonable estimates of the long-term performance of Area G and, hence, the disposal facility's ability to comply with Department of Energy (DOE) performance objectives. Annual disposal receipt reviews indicate that smaller volumes of waste will require disposal in the pits and shafts at Area G relative to what was projected for the performance assessment and composite analysis. The future inventories are projected to decrease modestly for the pits but increase substantially for the shafts due to an increase in the amount of tritium that is projected to require disposal. Overall, however, changes in the projected future inventories of waste are not expected to compromise the ability of Area G to satisfy DOE performance objectives. The Area G composite analysis addresses potential impacts from all waste disposed of at the facility, as well as other sources of radioactive material that may interact with releases from Area G. The level of knowledge about the other sources included in the composite analysis has not changed sufficiently to call into question the validity of that analysis. Ongoing environmental surveillance activities are conducted at, and in the vicinity of, Area G. However, the information generated by many of these activities cannot be used to evaluate the validity of the performance assessment and composite analysis models because the monitoring data collected are specific to operational releases or address receptors that are outside the domain of the performance assessment and composite analysis. In general, applicable monitoring data are supportive of some aspects of the performance assessment and composite analysis. Several research and development (R and D) efforts have been initiated under the performance assessment and composite analysis maintenance program. These investigations are designed to improve the current understanding of the disposal facility and site, thereby reducing the uncertainty associated with the projections of the long-term performance of Area G. The status and results of R and D activities that were undertaken in fiscal year 2011 are discussed in this report. Special analyses have been conducted to determine the feasibility of disposing of specific waste streams, to address proposed changes in disposal operations, and to consider the impacts of changes to the models used to conduct the performance assessment and composite analysis. These analyses are described and the results of the evaluations are summarized in this report. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, all disposal operations at Area G have been confined to MDA G. Material Disposal Area G is scheduled to undergo final closure in 2015; disposal of waste in the pits and shafts is scheduled to end in 2013. In anticipation of the closure of MDA G, plans are being made to ship the majority of the waste generated at LANL to off-site locations for disposal. It is not clear at this time if waste that will be disposed of at LANL will be placed in Zone 4 or if disposal operations will move to a new location at the Laboratory. Separately, efforts to optimize the final cover used in the closure of MDA G are underway; a final cover design different than that adopted for the performance assessment and composite analy

French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [WPS: WASTE PROJECTS AND SERVICES

2012-05-22T23:59:59.000Z

400

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in...

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

402

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W35 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

403

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W31 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

404

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-07 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

405

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W34 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

406

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-08 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

407

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunitycontent...

408

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-09 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

409

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W33 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

410

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W32 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

411

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-08-01 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

412

"ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250 "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per stream day)",15000

413

300 Area D4 Project Fiscal Year 2009 Building Completion Report  

SciTech Connect

This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

B. J. Skwarek

2010-01-27T23:59:59.000Z

414

User Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS User Calendar Date Event November 19, 2013 Proposal Review Panel Meetings December 10, 2013 Beamtime Allocation Committee Meeting January 22, 2014 Joint APSUO Steering Committee and Partner User Council Meeting March 7, 2014 Proposal Deadline Run Cycle 2014-2 March 11-13, 2014 Scientific Advisory Committee Meeting May 12-15, 2014 APS/CNM/EMC Users Meeting May 13, 2014 Partner User Council Meeting May 14, 2014 APSUO Steering Committee Meeting July 9, 2014 Joint APSUO Steering Committee and Partner User Council Meeting July 11, 2014 Proposal Deadline Run Cycle 2014-3 September 17, 2014 Joint APSUO Steering Committee and Partner User Council Meeting November 4-6, 2014 Scientific Advisory Committee Meeting March 16-18, 2015 Scientific Advisory Committee Meeting

415

The Evolution Towards Grids: Ten Years of High-Speed, Wide Area, Data Intensive Computing  

E-Print Network (OSTI)

1 The Evolution Towards Grids: Ten Years of High-Speed, Wide Area, Data Intensive Computing William aggregating and scheduling many resources. Data must be located and staged, cache and network capacity must and non-destructive imaging to supply real-time data to a remote, on-line, airframe structures expert who

416

Calendar of Events | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar of Events beta Calendar of Events beta January 2014 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 [ Previous Events ] RSS iCalendar hcalendar supported Also available in RSS and iCalendar formats. To report an event that is not listed, contact webmaster. Upcoming Jan 13 Monday Engineering the Elasticity of Soft Colloidal Materials Through Surface Modification and Shape Anisotropy Speaker: Lillian C. Hsiao, University of Michigan, Ann Arbor XSD Presentation 401/A1100 @ 11:00 AM View Description Designing complex fluids has always involved the arduous manipulation of system-specific parameters. Recently, we developed a general correlation to predict the flow behavior of a range of soft matter based on their microstructure. By applying the framework of structural rigidity at the

417

Joint Outreach Task Group (JOTG) Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Group (JOTG) Calendar 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Program Manager: Mary...

418

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

419

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly....

420

AREA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AREA AREA FAQ # Question Response 316 vs DCAA FAQ 1 An inquiry from CH about an SBIR recipient asking if a DCAA audit is sufficient to comply with the regulation or if they need to add this to their audit they have performed yearly by a public accounting firm. 316 audits are essentially A-133 audits for for-profit entities. They DO NOT replace DCAA or other audits requested by DOE to look at indirect rates or incurred costs or closeouts. DCAA would never agree to perform A-133 or our 316 audits. They don't do A-133 audits for DOD awardees. The purpose of the audits are different, look at different things and in the few instances of overlap, from different perspectives. 316

Note: This page contains sample records for the topic "areas calendar year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Events Calendar | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Events Calendar Events Calendar University Physics Events Upcoming Events Events Calendar Type of Event - Any - Colloquia Conference Geophysical Fluid Dynamics Laboratory Open House Princeton University Research Seminar Science Education Science On Saturday Apply COLLOQUIUM: "The Usefulness of Useless Knowledge": The History of the Institute for Advanced Study, Christine Di Bella, Institute for Advanced Study Wednesday, January 29, 2014 - 16:00 to 18:30 COLLOQUIUM: Addressing Big Data Challenges in Simulation-based Science, Professor Manish Prashar, Rutgers University Wednesday, January 22, 2014 - 16:00 to 17:30 COLLOQUIUM: The Global Carbon Cycle and Earth's Climate, Professor David Archer, University of Chicago Wednesday, January 15, 2014 - 16:00 to 17:30 COLLOQUIUM: On Tracing the Origins of the Solar Wind, Dr. Sarah McGregor,

422

LEDS Events Calendar | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » LEDS Events Calendar Jump to: navigation, search Home | About | Inventory | Partnerships | Capacity Building | Webinars | Reports | Events | News | List Serve LEDS Events Calendar January 2014 Today January February March April May June July August September October November December 2014 Go to month Sunday Monday Tuesday Wednesday Thursday Friday Saturday 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 Add an Event Upcoming LEDS Events Retrieved from "http://en.openei.org/w/index.php?title=LEDS_Events_Calendar&oldid=384765" What links here Related changes

423

NERSC: 40 YEARS AT THE FOREFRONT  

NLE Websites -- All DOE Office Websites (Extended Search)

CALENDAR CALENDAR CSO 0019 NERSC: 40 YEARS AT THE FOREFRONT In 1974, an almost-obsolete supercomputer once used for defense research was made available to support the fusion energy research community, the first time such a powerful computing resource was used for unclassified scientific computing. That start as the Controlled Thermonuclear Research Computer Center marked the launch of what today is known as the National Energy Research Scientific Computing Center at Lawrence Berkeley National Laboratory (Berkeley Lab). Located at Lawrence Livermore National Laboratory from 1974-96, the center was renamed the National Magnetic Fusion Energy Computing Center (NMFECC) in 1976, and in 1983 it began providing a fraction of its computing cycles to other research areas. To reflect

424

Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan  

SciTech Connect

Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

NONE

1998-03-01T23:59:59.000Z

425

Combined Fiscal Year (FY) 2006 Annual Performance Results and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

426

Combined Fiscal Year (FY) 2010 Annual Performance Results and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About...

427

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

428

Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington  

SciTech Connect

In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy`s Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1992-09-01T23:59:59.000Z

429

Cropland Area and Net Primary Production Computed from 30 Years of USDA Agricultural Harvest Data  

Science Conference Proceedings (OSTI)

Croplands cover large areas of the globe and contribute significantly to the global carbon cycle. However, like other ecosystems, limited information exists on spatially explicit, ground-based estimates of carbon fluxes. In this study, county-...

Jeffrey A. Hicke; David B. Lobell; Gregory P. Asner

2004-07-01T23:59:59.000Z

430

Area G Perimeter Surface-Soil Sampling Environmental Surveillance for Fiscal Year 1998 Hazardous and Solid Waste Group (ESH-19)  

SciTech Connect

Material Disposal Area G (Area G) is at Technical Area 54 at Los Alamos National Laboratory (LANL). Area G has been the principal facility for the disposal of low-level, solid-mixed, and transuranic waste since 1957. It is currently LANL's primary facility for radioactive solid waste burial and storage. As part of the annual environmental surveillance effort at Area G, surface soil samples are collec