Powered by Deep Web Technologies
Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

PARS II Process Document – DOE Period Close  

Broader source: Energy.gov [DOE]

This document details the process adopted by the Office of Acquisition and Project Management to prepare APM DepSec Monthly Status Report, finalize DOE close period package, and perform reporting...

2

Microsoft Word - PARS II Process Document - Close Period 2013...  

Office of Environmental Management (EM)

the process of preparing the APM Deputy Secretary Monthly Report and closing the DOE Reporting Period in PARS II. SCOPE This process applies to the Headquarters Office of...

3

WRAP process area development control work plan  

SciTech Connect (OSTI)

This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

Leist, K.L., Fluor Daniel Hanford

1997-02-27T23:59:59.000Z

4

300 Area Process Trenches Closure Plan  

SciTech Connect (OSTI)

Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ``co-operator.`` The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit.

Luke, S.N.

1994-08-15T23:59:59.000Z

5

Sound propagation in urban areas: A periodic disposition of buildings  

Science Journals Connector (OSTI)

A numerical simulation of background noise propagation is performed for a network of hexagonal buildings. The obtained results suggest that the prediction of background noise in urban spaces is possible by means of a modified diffusion equation using two parameters: the diffusion coefficient that expresses the spreading out of noise resulting from diffuse scattering and multiple reflections by buildings, and an attenuation term accounting for the wall absorption, atmospheric attenuation, and absorption by the open top. The dependence of the diffusion coefficient with geometrical shapes and the diffusive nature of the buildings are investigated in the case of a periodic disposition of hexagonal buildings.

J. Picaut; J. Hardy; L. Simon

1999-10-01T23:59:59.000Z

6

PARS II Process Document - DOE Period Close | Department of Energy  

Office of Environmental Management (EM)

by the Office of Acquisition and Project Management to prepare APM DepSec Monthly Status Report, finalize DOE close period package, and perform reporting period close...

7

Dental analysis of Classic period population variability in the Maya area  

E-Print Network [OSTI]

DENTAL ANALYSIS OF CLASSIC PERIOD POPULATION VARIABILITY IN THE MAYA AREA A Dissertation by ANDREW KENNETH SCHERER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... Morphology and Size......................................................50 Dental Anthropology and Human Population Variation...........................................57 Previous Studies of Ancient Mesoamerican Population...

Scherer, Andrew Kenneth

2005-02-17T23:59:59.000Z

8

Microsoft Word - PARS II Process Document - Close Period 2013-04-29 _FINAL_  

Broader source: Energy.gov (indexed) [DOE]

PARS II APM DepSec Monthly Report & Close Period, V-2013-04-29 Page 1 PARS II APM DepSec Monthly Report & Close Period, V-2013-04-29 Page 1 PARS II Process Document APM DEPSEC MONTHLY REPORT & CLOSE PERIOD PURPOSE The purpose of this document is to describe the process of preparing the APM Deputy Secretary Monthly Report and closing the DOE Reporting Period in PARS II. SCOPE This process applies to the Headquarters Office of Acquisition and Project Management (HQ OAPM) and its support contractors as the organization that prepares the monthly reports and closes the monthly reporting period. The process covers data validation and verification; running, distributing and archiving of reports; and

9

Confinement Ventilation and Process Gas Treatment Functional Area Qualification Standard  

Broader source: Energy.gov (indexed) [DOE]

. . NOT MEASUREMENT SENSITIVE DOE-STD-1168-2013 October 2013 DOE STANDARD CONFINEMENT VENTILATION AND PROCESS GAS TREATMENT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1168-2013 This document is available on the Department of Energy Technical Standards Program Website at http://energy.gov/hss/information-center/department-energy-technical-standards-program ii DOE-STD-1168-2013 INTENTIONALLY BLANK iv DOE-STD-1168-2013 TABLE OF CONTENTS ACKNOWLEDGMENT...................................................................................................................vii

10

Mathematical model of optimal control of a process of periodic verification of measurement devices  

Science Journals Connector (OSTI)

A synthesis of mathematical machinery is presented which allows us to solve the problem of optimizing the extent and periodicity of verification taking into account the parameters of a ... random process of varia...

F. I. Khrapov

1998-07-01T23:59:59.000Z

11

Total Crude Oil and Petroleum Products Imports by Processing Area  

Gasoline and Diesel Fuel Update (EIA)

Product: Total Crude Oil and Petroleum Products Crude Oil Total Products Other Liquids Unfinished Oils Naphthas and Lighter Kerosene and Light Gas Oils Heavy Gas Oils Residuum Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Product: Total Crude Oil and Petroleum Products Crude Oil Total Products Other Liquids Unfinished Oils Naphthas and Lighter Kerosene and Light Gas Oils Heavy Gas Oils Residuum Period-Unit: Monthly-Thousand Barrels Monthly-Thousand Barrels per Day Annual-Thousand Barrels Annual-Thousand Barrels per Day Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Product Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History East Coast (PADD 1) 62,196 60,122 54,018 52,671 54,668 52,999 1981-2013 Midwest (PADD 2) 54,439 53,849 53,638 60,984 63,482 56,972 1981-2013 Gulf Coast (PADD 3) 141,142 150,846 138,204 149,059 141,421 138,656 1981-2013

12

Effect of Micro-Area pH Value on Formation of Different Rust Phases of Weathering Steel in Initial Corrosion Period  

Science Journals Connector (OSTI)

Abstract The formation of protective rust layer of atmospheric corrosion resistance was discussed for weathering steel. The rust layers of experimental steels were made by using an accelerating industrial atmospheric corrosion test of dry-wet cyclic immersion. Furthermore XRD were used to measure and analyze the rust layers. The initial corrosion processes below thin water film were observed and the changes of micro-area pH value were measured. The results are as follows: The corrosion processes of P-RE weathering steel are obviously different from those of carbon steel. The surface of P-RE weathering steel rapidly forms ?-FeOOH and the micro-area pH value is above 5, 4 during the initial corrosion period. While the component of the rust layer for the carbon steel is mainly Fe3O4 and the microarea pH value is below 3.8.

Xiao-ping CHEN; Xiang-dong WANG; Qing-you LIU; Feng-yi MI; Ying CHEN; Yu-su LI

2010-01-01T23:59:59.000Z

13

Wide-Area Thermal Processing of Light-Emitting Materials  

SciTech Connect (OSTI)

Silicon carbide based materials and devices have been successfully exploited for diverse electronic applications. However, they have not achieved the same success as Si technologies due to higher material cost and higher processing temperatures required for device development. Traditionally, SiC is not considered for optoelectronic applications because it has an indirect bandgap. However, AppliCote Associates, LLC has developed a laser-based doping process which enables light emission in SiC through the creation of embedded p-n junctions. AppliCote laser irradiation of silicon carbide allows two different interaction mechanisms: (1) Laser conversion or induced phase transformation which creates carbon rich regions that have conductive properties. These conductive regions are required for interconnection to the light emitting semiconducting region. (2) Laser doping which injects external dopant atoms into the substrate that introduces deep level transition states that emit light when electrically excited. The current collaboration with AppliCote has focused on the evaluation of ORNL's unique Pulse Thermal Processing (PTP) technique as a replacement for laser processing. Compared to laser processing, Pulse Thermal Processing can deliver similar energy intensities (20-50 kW/cm2) over a much larger area (up to 1,000 cm2) at a lower cost and much higher throughput. The main findings of our investigation; which are significant for the realization of SiC based optoelectronic devices, are as follows: (1) The PTP technique is effective in low thermal budget activation of dopants in SiC similar to the laser technique. The surface electrical conductivity of the SiC samples improved by about three orders of magnitude as a result of PTP processing which is significant for charge injection in the devices; (2) The surface composition of the SiC film can be modified by the PTP technique to create a carbon-rich surface (increased local C:Si ratio from 1:1 to 2.9:1). This is significant as higher thermal and electrical conductivities of the surface layer are critical for a successful development of integrated optoelectronic devices; and (3) PTP provides low thermal budget dopant activation with a controlled depth profile, which can be exploited for high performance device development with selective patterning of the substrate. This project has successfully demonstrated that a low thermal budget annealing technique, such as PTP, is critical to defining the path for low cost electronic devices integrated on glass or polymeric substrates. This project is complimentary to the goals of the Solid State Lighting Program within DOE. It involves new manufacturing techniques for light emitting materials that are potentially much lower cost and energy efficient than existing products. Significant opportunity exists for further exploration of AppliCote's material and device technology in combination with ORNL's PTP technique, modeling, and characterization capabilities.

Duty, C.; Quick, N. (AppliCote Associates, LLC) [AppliCote Associates, LLC

2011-09-30T23:59:59.000Z

14

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

15

A Gaussian Process Based Online Change Detection Algorithm for Monitoring Periodic Time Series  

SciTech Connect (OSTI)

Online time series change detection is a critical component of many monitoring systems, such as space and air-borne remote sensing instruments, cardiac monitors, and network traffic profilers, which continuously analyze observations recorded by sensors. Data collected by such sensors typically has a periodic (seasonal) component. Most existing time series change detection methods are not directly applicable to handle such data, either because they are not designed to handle periodic time series or because they cannot operate in an online mode. We propose an online change detection algorithm which can handle periodic time series. The algorithm uses a Gaussian process based non-parametric time series prediction model and monitors the difference between the predictions and actual observations within a statistically principled control chart framework to identify changes. A key challenge in using Gaussian process in an online mode is the need to solve a large system of equations involving the associated covariance matrix which grows with every time step. The proposed algorithm exploits the special structure of the covariance matrix and can analyze a time series of length T in O(T^2) time while maintaining a O(T) memory footprint, compared to O(T^4) time and O(T^2) memory requirement of standard matrix manipulation methods. We experimentally demonstrate the superiority of the proposed algorithm over several existing time series change detection algorithms on a set of synthetic and real time series. Finally, we illustrate the effectiveness of the proposed algorithm for identifying land use land cover changes using Normalized Difference Vegetation Index (NDVI) data collected for an agricultural region in Iowa state, USA. Our algorithm is able to detect different types of changes in a NDVI validation data set (with ~80% accuracy) which occur due to crop type changes as well as disruptive changes (e.g., natural disasters).

Chandola, Varun [ORNL; Vatsavai, Raju [ORNL

2011-01-01T23:59:59.000Z

16

FM13 Glastir woodland creation appeals form 3 December, 2010 Glastir Woodland Creation Appeals Process-Red Areas  

E-Print Network [OSTI]

Process-Red Areas Glastir Woodland Creation Appeals Process ­ Red Areas This should only be used where you: What is the reason/s for the RED designation? Why do you think that the area has been incorrectly the boundary of the area that you wish to plant in the red areas in question Project Officer

17

Large area radio frequency plasma for microelectronics processing Z. Yu and D. Shaw  

E-Print Network [OSTI]

focus on wide area plasma uniformity and undesired antenna window erosion caused by the plasma. OurLarge area radio frequency plasma for microelectronics processing Z. Yu and D. Shaw Colorado State November 1994 Radio-frequency rf inductively coupled planar plasma ICP provides a better way to generate

Collins, George J.

18

AREA  

Broader source: Energy.gov (indexed) [DOE]

AREA AREA FAQ # Question Response 316 vs DCAA FAQ 1 An inquiry from CH about an SBIR recipient asking if a DCAA audit is sufficient to comply with the regulation or if they need to add this to their audit they have performed yearly by a public accounting firm. 316 audits are essentially A-133 audits for for-profit entities. They DO NOT replace DCAA or other audits requested by DOE to look at indirect rates or incurred costs or closeouts. DCAA would never agree to perform A-133 or our 316 audits. They don't do A-133 audits for DOD awardees. The purpose of the audits are different, look at different things and in the few instances of overlap, from different perspectives. 316

19

Signal Processing as a Tool to Enhance Productivity in Industry - Measurement and Cancelation of Periodic Signals.  

E-Print Network [OSTI]

??Preface This licentiate thesis summarizes my work within the field of Signal Processing during my time in Signal Control Sweden AB from 1987 to 2002.… (more)

Olsson, Sven

2006-01-01T23:59:59.000Z

20

Synthetic process for preparation of high surface area electroactive compounds for battery applications  

DOE Patents [OSTI]

A process is disclosed for the preparation of electroactive cathode compounds useful in lithium-ion batteries, comprising exothermic mixing of low-cost precursors and calcination under appropriate conditions. The exothermic step may be a spontaneous flameless combustion reaction. The disclosed process can be used to prepare any lithium metal phosphate or lithium mixed metal phosphate as a high surface area single phase compound.

Evenson, Carl; Mackay, Richard

2013-07-23T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Cancer Mortality in the High Background Radiation Areas of Yangjiang, China during the Period between 1979 and 1995  

Science Journals Connector (OSTI)

......In 1979, we established the Health Household Registry (HHR) in every village of...19871995, which was obtained by the China- Japan collaborative study. As shown in Table...conducted in our study area, we selected 30 households from each of the three dose groups in......

Zufan Tao; Yongru Zha; Suminori Akiba; Quanfu Sun; Jianming Zou; Jia Li; Yusheng Liu; Hiroo Kato; Tsutomu Sugahara; Luxin Wei

2000-03-01T23:59:59.000Z

22

Computer-aided industrial process design; the ASPEN Project. First annual report for the period.  

E-Print Network [OSTI]

Work during the first year of this contract concentrated on acquiring the project staff, development of a prototype simulator, the simulation of three coal conversion processes, a survey of software for acquisition, the ...

Massachusetts Institute of Technology. Energy Laboratory.

1977-06-15T23:59:59.000Z

23

Northern Hemisphere Biome-and Process-Specific Changes in Forest Area and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Northern Hemisphere Biome-and Process-Specific Changes in Forest Area and Northern Hemisphere Biome-and Process-Specific Changes in Forest Area and Gross Merchantable Volume: 1890-1990 (DB1017) data Data DOI: 10.3334/CDIAC/lue.db1017 Contributors A. N. D. Auclair, J. A. Bedford, and C. Revenga Description This database lists annual changes in areal extent (Ha) and gross merchantable wood volume (m3) produced by depletion and accrual processes in boreal and temperate forests in Alaska, Canada, Europe, Former Soviet Union, Non-Soviet temperate Asia, and the contiguous United States for the years 1890 through 1990. Forest depletions (source terms for atmospheric CO2) are identified as forest pests, forest dieback, forest fires, forest harvest, and land-use changes (predominantly the conversion of forest, temperate woodland, and shrubland to cropland). Forest accruals (sink terms

24

DOE-STD-1176-2004; Chemical Processing Functional Area Qualification Standard  

Broader source: Energy.gov (indexed) [DOE]

76-2004 76-2004 January 2004 DOE STANDARD CHEMICAL PROCESSING FUNCTIONAL AREA QUALIFICATION STANDARD DOE Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited NOT MEASUREMENT SENSITIVE DOE-STD-1176-2004 i This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA

25

Development of OTM Syngas Process and Testing of Syngas Derived Ulta-clean Fuels in Diesel Engines and Fuel Cells Budget Period 3  

SciTech Connect (OSTI)

This topical report summarizes work accomplished for the Program from January 1, 2003 through December 31,2004 in the following task areas: Task 1--Materials Development; Task 2--Composite Development; Task 4--Reactor Design and Process Optimization; Task 8--Fuels and Engine Testing; 8.1 International Diesel Engine Program; and Task IO: Program Management. Most of the key technical objectives for this budget period were achieved. Only partial success was achieved relative to cycle testing under pressure Major improvements in material performance and element reliability have been achieved. A breakthrough material system has driven the development of a compact planar reactor design capable of producing either hydrogen or syngas. The planar reactor shows significant advantages in thermal efficiency and costs compared to either steam methane reforming with CO{sub 2} recovery or autothermal reforming. The fuel and engine testing program is complete The single cylinder test engine evaluation of UCTF fuels begun in Budget Period 2 was finished this budget period. In addition, a study to evaluate new fuel formulations for an HCCl engine was completed.

E.T. Robinson; John Sirman; Prasad Apte; Xingun Gui; Tytus R. Bulicz; Dan Corgard; Siv Aasland; Kjersti Kleveland; Ann Hooper; Leo Bonnell; John Hemmings; Jack Chen; Bart A. Van Hassel

2004-12-31T23:59:59.000Z

26

Tanks Focus Area retrieval process development and enhancements FY96 technology development summary report  

SciTech Connect (OSTI)

The Retrieval Process Development and Enhancements (RPD&E) activities are part of the Retrieval and Closure Program of the U.S. Department of Energy (DOE) EM-50 Tanks Focus Area. The purposes of RPD&E are to understand retrieval processes, including emerging and existing technologies, and to gather data on those processes, so that end users have the requisite technical basis to make retrieval decisions. Work has been initiated to support the need for multiple retrieval technologies across the DOE complex. Technologies addressed during FY96 focused on enhancements to sluicing, borehole mining, confined sluicing retrieval end effectors, the lightweight scarifier, and pulsed air mixing. Furthermore, a decision tool and database have been initiated to link retrieval processes with tank closure to assist end users in making retrieval decisions.

Rinker, M.W.; Bamberger, J.A.; Hatchell, B.K. [and others

1996-09-01T23:59:59.000Z

27

Designating marine protected areas in the United States and Ecuador: understanding the decision-making process  

E-Print Network [OSTI]

are central federal agencies and field bureaucracies, producer interests, consumer interests and occasionally Congress. Examples of producer interests in marine policy would be commercial fisheries, and the hydrocarbon industry. Examples of consumer... of the requirements for the degree of MASTER OF SCIENCE May 1991 Major Subject: Wildlife and Fisheries Sciences DESIGNATING MARINE PROTECTED AREAS IN THE UNITED STATES AND ECUADOR: UNDERSTANDING THE DECISION-MAKING PROCESS A Thesis by AMRIT WORK KENDRICK A...

Kendrick, Amrit Work

1991-01-01T23:59:59.000Z

28

Revised ground-water monitoring compliance plan for the 300 area process trenches  

SciTech Connect (OSTI)

This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

1988-09-01T23:59:59.000Z

29

Decontamination and decommissioning of the Chemical Process Cell (CPC): Topical report for the period January 1985-March 1987  

SciTech Connect (OSTI)

To support interim storage of vitrified High-Level Waste (HLW) at the West Valley Demonstration Project, the shielded, remotely operated Chemical Process Cell (CPC) was decommissioned and decontaminated. All equipment was removed, packaged and stored for future size reduction and decontamination. Floor debris was sampled, characterized, and vacuumed into remotely handled containers. The cell walls, ceiling, and floor were decontaminated. Three 20 Mg (22.5 ton) concrete neutron absorber cores were cut with a high-pressure water/abrasive jet cutting system and packaged for disposal. All operations were performed remotely using two overhead bridge cranes which included two 1.8 Mg (2 ton) hoists, one 14.5 Mg (16 ton) hoist, and an electromechanical manipulator or an industrial robot mounted on a mobile platform. Initial general area dose rates in the cell ranged from 1 to 50 R/h. Target levels of less than 10 mR/h general area readings were established before decontamination and decommissioning was initiated; general area dose rates between 200 mR/h and 1200 mR/h were obtained at the completion of the decontamination work. 4 refs., 11 figs., 8 tabs.

Meigs, R. A.

1987-07-01T23:59:59.000Z

30

EM-50 Tanks Focus Area retrieval process development and enhancements. FY97 technology development summary report  

SciTech Connect (OSTI)

The Retrieval Process Development and Enhancements (RPD and E) activities are part of the US Department of Energy (DOE) EM-50 Tanks Focus Area, Retrieval and Closure program. The purpose of RPD and E is to understand retrieval processes, including emerging and existing technologies, and to gather data on these processes, so that end users have requisite technical bases to make retrieval decisions. Technologies addressed during FY97 include enhancements to sluicing, the use of pulsed air to assist mixing, mixer pumps, innovative mixing techniques, confined sluicing retrieval end effectors, borehole mining, light weight scarification, and testing of Russian-developed retrieval equipment. Furthermore, the Retrieval Analysis Tool was initiated to link retrieval processes with tank waste farms and tank geometric to assist end users by providing a consolidation of data and technical information that can be easily assessed. The main technical accomplishments are summarized under the following headings: Oak Ridge site-gunite and associated tanks treatability study; pulsed air mixing; Oak Ridge site-Old Hydrofracture Facility; hydraulic testbed relocation; cooling coil cleaning end effector; light weight scarifier; innovative tank mixing; advanced design mixer pump; enhanced sluicing; Russian retrieval equipment testing; retrieval data analysis and correlation; simulant development; and retrieval analysis tool (RAT).

Rinker, M.W.; Bamberger, J.A. [Pacific Northwest National Lab., Richland, WA (United States); Alberts, D.G. [Waterjet Technology, Inc., Kent, WA (United States)] [and others

1997-09-01T23:59:59.000Z

31

Gasoline from natural gas by sulfur processing. Quarterly report No. 5 for the period July 1994--September 1994  

SciTech Connect (OSTI)

Natural gas is an abundant resource in various parts of the world. The major component of natural gas is methane, often comprising over 90% of the hydrocarbon fraction of the gas. The expanded use of natural gas as fuel is often hampered because of difficulties in storing and handling a gaseous fuel. This is especially true for natural gas in remote areas such as the North Slope of Alaska. The successful implementation of a natural gas-to-gasoline process would decrease dependence on imported oil for transportation fuels. These factors make it very desirable to convert natural gas to more valuable liquids. There are commercial processes for converting natural gas to gasoline-range liquids. These processes, such as the Fischer-Tropsch synthesis and Mobil`s MTG (Methanol To Gasoline), start with the steam reforming of methane. Steam reforming of methane requires the removal of sulfur compounds present in natural gas down to less than 0.1 ppm. This additional gas cleanup step, with its additional cost, is necessary because the catalysts are quickly poisoned by sulfur compounds.

Erekson, E.J.; Miao, F.Q.

1994-10-01T23:59:59.000Z

32

Characterization of decontamination and decommissioning wastes expected from the major processing facilities in the 200 Areas  

SciTech Connect (OSTI)

This study was intended to characterize and estimate the amounts of equipment and other materials that are candidates for removal and subsequent processing in a solid waste facility when the major processing and handling facilities in the 200 Areas of the Hanford Site are decontaminated and decommissioned. The facilities in this study were selected based on processing history and on the magnitude of the estimated decommissioning cost cited in the Surplus Facilities Program Plan; Fiscal Year 1993 (Winship and Hughes 1992). The facilities chosen for this study include B Plant (221-B), T Plant (221-T), U Plant (221-U), the Uranium Trioxide (UO{sub 3}) Plant (224-U and 224-UA), the Reduction Oxidation (REDOX) or S Plant (202-S), the Plutonium Concentration Facility for B Plant (224-B), and the Concentration Facility for the Plutonium Finishing Plant (PFP) and REDOX (233-S). This information is required to support planning activities for current and future solid waste treatment, storage, and disposal operations and facilities.

Amato, L.C.; Franklin, J.D.; Hyre, R.A.; Lowy, R.M.; Millar, J.S.; Pottmeyer, J.A. [Los Alamos Technical Associates, Kennewick, WA (United States); Duncan, D.R. [Westinghouse Hanford Co., Richland, WA (United States)

1994-08-01T23:59:59.000Z

33

Necessary and Sufficient Standards Closure Process pilot: F- and H-Area groundwater remediation  

SciTech Connect (OSTI)

The DOE Standards Committee`s Necessary and Sufficient (N and S) Standards Closure Process was piloted at SRS on the F- and H- Area Seepage Basins Groundwater Remediation Project. For this existing Environmental Restoration project, the set of N and S standards for design and safety documentation were identified, independently confirmed and approved. Implementation of these standards on the project can lead to a $2.8 Million cost savings on the design, construction/installation, and safety documentation scope of $18 Million. These savings were primarily from site design of power distribution and piping for the water treatment units. Also contributing to the savings were a more appropriate level of safety documentation and the alternate ``commercial`` bids made by vendors in response to a request for proposals for water treatment units. The use of the N and S Process on an ER activity, details on the cost savings, lessons learned and recommendations for broader implementation of the N and S Process are described herein.

Bullington, M.

1995-09-25T23:59:59.000Z

34

Alcohol policy process in Thailand.  

E-Print Network [OSTI]

??The thesis describes and analyses the Thai alcohol policy process in the period 1997 - 2006, in order to investigate the characteristics and areas for… (more)

Thaksaphon, Thamarangsi

2008-01-01T23:59:59.000Z

35

Measurement of higher harmonics in periodic vibrations using phase-modulated TV holography with digital image processing  

Science Journals Connector (OSTI)

We separately measure the higher harmonics vibration patterns of a periodic vibrating object by using time-average TV holography and phase modulation. During measurements the frequency...

Løkberg, Ole J; Pedersen, Hans M; Valø, Hilde; Wang, Gunnar

1994-01-01T23:59:59.000Z

36

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once a year for a period of 2-3 months. By  

E-Print Network [OSTI]

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once. Figure 1.g The wet area is flooded by damming up a small streamded by damming up a smded by damwet area Vegetation data are obtained from two ri- parian grassland sites with strong hydro- logical gradients

Schierup, Mikkel Heide

37

E-Print Network 3.0 - area process research Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 2011 Together with teaching and community service, research is one of the three pillars of the University of Summary: themes and eight sub-themes that reflect areas of...

38

Impact of Uranium Mining and Processing on the Environment of Mountainous areas of Kyrgyzstan  

Science Journals Connector (OSTI)

In this report the results of analysis of modern geo-ecological situation in areas of uranium mining and milling in the territory of Kyrgyzstan are presented. Major threats for the mountain environment and cit...

I. A. Torgoev; U. G. Aleshyn; H. B. Havenit

2002-01-01T23:59:59.000Z

39

E-Print Network 3.0 - area process trenches Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

II Collection: Materials Science 35 A novel solid-state self powered neutron detector Nicholas LiCausi*a Summary: area of the p-n junction is increased proportionally to...

40

Viewstation applications: intelligent video processing over a broadband local area network  

Science Journals Connector (OSTI)

This paper describes applications built on the ViewStation, a distributed multimedia system based on Unix workstations and a gigabit per second local area network. A key tenet of the ViewStation project is the delivery of media data not just to the desktop ...

Christopher J. Lindblad; David J. Wetherall; William F. Stasior; Joel F. Adam; Henry H. Houh; Mike Ismert; David R. Bacher; Brent M. Phillips; David L. Tennenhouse

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Low-to-moderate temperature geothermal resource assessment for Nevada: Area specific studies, final report for the period June 1, 1980-August 30, 1981  

SciTech Connect (OSTI)

The Hawthorne study area is located in Mineral County, Nevada and surrounds the municipality of the same name. It encompasses an area of approximately 310 sq. km (120 sq. mi), and most of the land belongs to the US Army Ammunition Plant. The energy needs of the military combined with those of the area population (over 5,000 residents) are substantial. The area is classified as having a high potential for direct applications using the evaluation scheme described in Trexler and others (1979). A variety of scientific techniques was employed during area-wide resource assessment. General geologic studies demonstrate the lithologic diversity in the area; these studies also indicate possible sources for dissolved fluid constituents. Geophysical investigations include aeromagnetic and gravity surveys which aid in defining the nature of regional, and to a lesser extent, local variations in subsurface configurations. Surface and near-surface structural features are determined using various types of photo imagery including low sun-angle photography. An extensive shallow depth temperature probe survey indicates two zones of elevated temperature on opposite sides of the Walker Lake basin. Temperature-depth profiles from several wells in the study area indicate significant thermal fluid-bearing aquifers. Fluid chemical studies suggest a wide spatial distribution for the resource, and also suggest a meteoric recharge source in the Wassuk Range. Finally, a soil-mercury survey was not a useful technique in this study area. Two test holes were drilled to conclude the area resource assessment, and thermal fluids were encountered in both wells. The western well has measured temperatures as high as 90 C (194 F) within 150 meters (500 ft) of the surface. Temperature profiles in this well indicate a negative temperature gradient below 180 meters (590 ft). The eastern hole had a bottom hole temperature of 61 C (142 F) at a depth of only 120 meters (395 ft). A positive gradient is observed to a total depth in the well.

Trexler, Dennis T.; Koeing, Brian A.; Flynn, Thomas; Bruce, James L.; Ghusn, George Jr.

1981-08-30T23:59:59.000Z

42

Radioactive Air Emissions Notice of Construction (NOC) for the 300 Area Process Sewer Cleanout  

SciTech Connect (OSTI)

This document serves as a NOC pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to construct pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the cleanout of sections of the 300 Area PS. Approval of the NOC will allow the pressure washing of certain pipe sections, the sump in the TEDF lift station, and the cleaning of PS 16 of the 300 Area PS that contains low levels of radioactivity. Section 15.0 of this NOC discusses the estimated total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) resulting from the unabated emissions from these cleaning activities. Using the currently approved unit dose conversion factors in HNF-3602, the estimated potential TEDE to the MEI resulting from the unabated, fugitive emissions from cleanout of the 300 Area PS is 4.70 E-05 millirem (mrem) per year. This dose was derived by conservatively estimating the doses from both the pressure washing and the use of the Guzzler{trademark} for removal of the liquid/soil mixture, as described in Section 5.0. and adding these doses together.

MENARD, N.M.

2000-06-16T23:59:59.000Z

43

200 Area effluent treatment facility process control plan 98-02  

SciTech Connect (OSTI)

This Process Control Plan (PCP) provides a description of the background information, key objectives, and operating criteria defining Effluent Treatment Facility (ETF) Campaign 98-02 as required per HNF-IP-0931 Section 37, Process Control Plans. Campaign 98-62 is expected to process approximately 18 millions gallons of groundwater with an assumption that the UP-1 groundwater pump will be shut down on June 30, 1998. This campaign will resume the UP-1 groundwater treatment operation from Campaign 97-01. The Campaign 97-01 was suspended in November 1997 to allow RCRA waste in LERF Basin 42 to be treated to meet the Land Disposal Restriction Clean Out requirements. The decision to utilize ETF as part of the selected interim remedial action of the 200-UP-1 Operable Unit is documented by the Declaration of the Record of Decision, (Ecology, EPA and DOE 1997). The treatment method was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), the Hanford Federal Facility Agreement and Consent Order (known as the Tri-Party Agreement or TPA), and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP).

Le, E.Q.

1998-01-30T23:59:59.000Z

44

Basic Data Report -- Defense Waste Processing Facility Sludge Plant, Savannah River Plant 200-S Area  

SciTech Connect (OSTI)

This Basic Data Report for the Defense Waste Processing Facility (DWPF)--Sludge Plant was prepared to supplement the Technical Data Summary. Jointly, the two reports were intended to form the basis for the design and construction of the DWPF. To the extent that conflicting information may appear, the Basic Data Report takes precedence over the Technical Data Summary. It describes project objectives and design requirements. Pertinent data on the geology, hydrology, and climate of the site are included. Functions and requirements of the major structures are described to provide guidance in the design of the facilities. Revision 9 of the Basic Data Report was prepared to eliminate inconsistencies between the Technical Data Summary, Basic Data Report and Scopes of Work which were used to prepare the September, 1982 updated CAB. Concurrently, pertinent data (material balance, curie balance, etc.) have also been placed in the Basic Data Report. It is intended that these balances be used as a basis for the continuing design of the DWPF even though minor revisions may be made in these balances in future revisions to the Technical Data Summary.

Amerine, D.B.

1982-09-01T23:59:59.000Z

45

Avian Monitoring and Risk Assessment at the Tehachapi Pass Wind Resource Area; Period of Performance: October 2, 1996--May 27, 1998  

SciTech Connect (OSTI)

Observations of dead raptors at the Altamont Pass Wind Resource Area triggered concerns on the parts of regulatory agencies, environmental/conservation groups, wildlife resource agencies, and wind and electric utility industries about possible impacts to birds from wind energy development. Bird fatality rates observed at most wind projects are not currently considered significant to individual bird species populations. Although many bird species have observed fatalities, raptors have received the most attention. The primary objective of this study was to estimate and compare bird utilization, fatality rates, and collision risk indices among factors such as bird taxonomic groups, turbine types, and turbine locations within the operating wind plant in the Tehachapi Pass WRA, in south-central California between October 1996 and May 1998.

Anderson, R.; Neumann, N.; Tom, J.; Erickson, W. P.; Strickland, M. D.; Bourassa, M.; Bay, K. J.; Sernka, K. J.

2004-09-01T23:59:59.000Z

46

Annual Report RCRA Post-Closure Monitoring and Inspections for CAU 91: Area 3 U-3fi Injection Well, Nevada Test Site, Nevada, for the period October 2000-October 2001  

SciTech Connect (OSTI)

This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi Injection Well during the October 2000 to October 2001 period. The U-3fi Injection Well is located in Area 3 of the Nevada Test Site (NTS), Nye County, Nevada. Inspections of the Area 3 U-3fi Injection Well are conducted to determine and document the physical condition of the concrete pad, facilities, and any unusual conditions that could impact the proper operation of the waste disposal unit closure. The objective of the neutron-logging program is to monitor the soil moisture conditions along the 128-meter (m) (420-ft) ER3-3 monitoring well and detect changes that may be indicative of moisture movement in the regulated interval extending between 73 to 82 m (240 to 270 ft) or to detect changes that may be indicative of subsidence within the disposal unit itself.

D. S. Tobiason

2002-02-01T23:59:59.000Z

47

Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on Hanford’s 300 Area Uranium Plume  

SciTech Connect (OSTI)

The Integrated Field-Scale Subsurface Research Challenge (IFRC) at the Hanford Site 300 Area uranium (U) plume addresses multi-scale mass transfer processes in a complex hydrogeologic setting where groundwater and riverwater interact. A series of forefront science questions on mass transfer are posed for research which relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements and approaches needed to characterize and model a mass-transfer dominated system. The project was initiated in February 2007, with CY 2007 and CY 2008 progress summarized in preceding reports. The site has 35 instrumented wells, and an extensive monitoring system. It includes a deep borehole for microbiologic and biogeochemical research that sampled the entire thickness of the unconfined 300 A aquifer. Significant, impactful progress has been made in CY 2009 with completion of extensive laboratory measurements on field sediments, field hydrologic and geophysical characterization, four field experiments, and modeling. The laboratory characterization results are being subjected to geostatistical analyses to develop spatial heterogeneity models of U concentration and chemical, physical, and hydrologic properties needed for reactive transport modeling. The field experiments focused on: (1) physical characterization of the groundwater flow field during a period of stable hydrologic conditions in early spring, (2) comprehensive groundwater monitoring during spring to characterize the release of U(VI) from the lower vadose zone to the aquifer during water table rise and fall, (3) dynamic geophysical monitoring of salt-plume migration during summer, and (4) a U reactive tracer experiment (desorption) during the fall. Geophysical characterization of the well field was completed using the down-well Electrical Resistance Tomography (ERT) array, with results subjected to robust, geostatistically constrained inversion analyses. These measurements along with hydrologic characterization have yielded 3D distributions of hydraulic properties that have been incorporated into an updated and increasingly robust hydrologic model. Based on significant findings from the microbiologic characterization of deep borehole sediments in CY 2008, down-hole biogeochemistry studies were initiated where colonization substrates and spatially discrete water and gas samplers were deployed to select wells. The increasingly comprehensive field experimental results, along with the field and laboratory characterization, are leading to a new conceptual model of U(VI) flow and transport in the IFRC footprint and the 300 Area in general, and insights on the microbiological community and associated biogeochemical processes. A significant issue related to vertical flow in the IFRC wells was identified and evaluated during the spring and fall field experimental campaigns. Both upward and downward flows were observed in response to dynamic Columbia River stage. The vertical flows are caused by the interaction of pressure gradients with our heterogeneous hydraulic conductivity field. These impacts are being evaluated with additional modeling and field activities to facilitate interpretation and mitigation. The project moves into CY 2010 with ambitious plans for a drilling additional wells for the IFRC well field, additional experiments, and modeling. This research is part of the ERSP Hanford IFRC at Pacific Northwest National Laboratory.

Zachara, John M.; Bjornstad, Bruce N.; Christensen, John N.; Conrad, Mark E.; Fredrickson, Jim K.; Freshley, Mark D.; Haggerty, Roy; Hammon, Glenn; Kent, Douglas B.; Konopka, Allan; Lichtner, Peter C.; Liu, Chongxuan; McKinley, James P.; Murray, Christopher J.; Rockhold, Mark L.; Rubin, Yoram; Vermeul, Vincent R.; Versteeg, Roelof J.; Ward, Anderson L.; Zheng, Chunmiao

2010-02-01T23:59:59.000Z

48

AREAS OF KNOWLEDGE NEEDED BY SUPERINTENDENTS AND ARCHITECTS TO ENHANCE THEIR COLLABORATION IN THE SCHOOL DESIGN PROCESS  

E-Print Network [OSTI]

of superintendents and architects to questions regarding their perceptions of areas to discuss when collaborating in the designing of a new school. Ninety-four Texas superintendents and forty-six architects participated in the survey. Major research findings from...

Lovesmith, Deanna M.

2010-01-16T23:59:59.000Z

49

Low Cost Solar Array Project cell and module formation research area. Process research of non-CZ silicon material. Final report, November 26, 1980-September 30, 1983  

SciTech Connect (OSTI)

The primary objective of the work reported was to investigate high-risk, high-payoff research areas associated with the Westinghouse process for producing photovoltaic modules using non-Czochralski sheet material. These tasks were addressed: technical feasibility study of forming front and back junctions using liquid dopant techniques, liquid diffusion mask feasibility study, application studies of antireflective material using a meniscus coater, ion implantation compatibility/feasibility study, and cost analysis. (LEW)

Campbell, R.B.

1983-01-01T23:59:59.000Z

50

Identification of Process Hazards and Accident Scenarios for Site 300 B-Division Firing Areas, Lawrence Livermore National Laboratory  

SciTech Connect (OSTI)

This report describes a hazard and accident analysis conducted for Site 300 operations to support update of the ''Site 300 B-Division Firing Areas Safety Analysis Report'' (SAR) [LLNL 1997]. A significant change since the previous SAR is the construction and the new Contained Firing Facility (CFF). Therefore, this hazard and accident analysis focused on the hazards associated with bunker operations to ensure that the hazards at CFF are properly characterized in the updated SAR. Hazard tables were created to cover both the CFF and the existing bunkers with ''open air'' firing tables.

Lambert, H; Johnson, G

2001-05-04T23:59:59.000Z

51

M-Area Hazardous Waste Management Facility. Fourth Quarter 1994, Groundwater Monitoring Report  

SciTech Connect (OSTI)

The unlined settling basin operated from 1958 until 1985, receiving waste water that contained volatile organic solvents used for metal degreasing and chemical constituents and depleted uranium from fuel fabrication process in M Area. The underground process sewer line transported M-Area process waste waters to the basin. Water periodically overflowed from the basin through the ditch to the seepage area adjacent to the ditch and to Lost Lake.

Chase, J.A.

1995-04-20T23:59:59.000Z

52

EA-1919: Notice of Public Comment Period Extension | Department...  

Broader source: Energy.gov (indexed) [DOE]

of Public Comment Period Extension EA-1919: Notice of Public Comment Period Extension Recycling of Scrap Metals Originating from Radiological Areas DOE has extended the public...

53

X-ray decay lines from heavy nuclei in supernova remnants as a probe of the r-process origin and the birth periods of magnetars  

Science Journals Connector (OSTI)

......research-article Article X-ray decay lines from heavy nuclei in supernova remnants...prospects for the detection of X-ray decay lines from r-process nuclei in young or nearby...detectable via the 10.7 (9.2) keV line complexes of 194Os by LOFT at 6sigma......

Justin L. Ripley; Brian D. Metzger; Almudena Arcones; Gabriel Martínez-Pinedo

2014-01-01T23:59:59.000Z

54

The Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFC Focused on Hanford’s 300 Area Uranium Plume Quality Assurance Project Plan  

SciTech Connect (OSTI)

The purpose of the project is to conduct research at an Integrated Field-Scale Research Challenge Site in the Hanford Site 300 Area, CERCLA OU 300-FF-5 (Figure 1), to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The project will investigate a series of science questions posed for research related to the effect of spatial heterogeneities, the importance of scale, coupled interactions between biogeochemical, hydrologic, and mass transfer processes, and measurements/approaches needed to characterize a mass-transfer dominated system. The research will be conducted by evaluating three (3) different hypotheses focused on multi-scale mass transfer processes in the vadose zone and groundwater, their influence on field-scale U(VI) biogeochemistry and transport, and their implications to natural systems and remediation. The project also includes goals to 1) provide relevant materials and field experimental opportunities for other ERSD researchers and 2) generate a lasting, accessible, and high-quality field experimental database that can be used by the scientific community for testing and validation of new conceptual and numerical models of subsurface reactive transport.

Fix, N. J.

2008-01-31T23:59:59.000Z

55

Radiological Areas  

Broader source: Energy.gov (indexed) [DOE]

Revision to Clearance Policy Associated with Recycle of Scrap Metals Originating from Revision to Clearance Policy Associated with Recycle of Scrap Metals Originating from Radiological Areas On July 13, 2000, the Secretary of Energy imposed an agency-wide suspension on the unrestricted release of scrap metal originating from radiological areas at Department of Energy (DOE) facilities for the purpose of recycling. The suspension was imposed in response to concerns from the general public and industry groups about the potential effects of radioactivity in or on material released in accordance with requirements established in DOE Order 5400.5, Radiation Protection of the Public and Environment. The suspension was to remain in force until DOE developed and implemented improvements in, and better informed the public about, its release process. In addition, in 2001 the DOE announced its intention to prepare a

56

Geothermal areas as analogues to chemical processes in the near-field and altered zone of the potential Yucca Mountain, Nevada repository  

SciTech Connect (OSTI)

The need to bound system performance of the potential Yucca Mountain repository for thousands of years after emplacement of high-level nuclear waste requires the use of computer codes. The use of such codes to produce reliable bounds over such long time periods must be tested using long-lived natural and historical systems as analogues. The geothermal systems of the Taupo Volcanic Zone (TVZ) in New Zealand were selected as the site most amenable to study. The rocks of the TVZ are silicic volcanics that are similar in composition to Yucca Mountain. The area has been subjected to temperatures of 25 to 300 C which have produced a variety of secondary minerals similar to those anticipated at Yucca Mountain. The availability of rocks, fluids and fabricated materials for sampling is excellent because of widespread exploitation of the systems for geothermal power. Current work has focused on testing the ability of the EQ3/6 code and thermodynamic data base to describe mineral-fluid relations at elevated temperatures. Welfare starting long-term dissolution/corrosion tests of rocks, minerals and manufactured materials in natural thermal features in order to compare laboratory rates with field-derived rates. Available field data on rates of silica precipitation from heated fluids have been analyzed and compared to laboratory rates. New sets of precipitation experiments are being planned. The microbially influenced degradation of concrete in the Broadlands-Ohaaki geothermal field is being characterized. The authors will continue to work on these projects in FY 1996 and expand to include the study of naturally occurring uranium and thorium series radionuclides, as a prelude to studying radionuclide migration in heated silicic volcanic rocks. 32 refs.

Bruton, C.J.; Glassley, W.E.; Meike, A.

1995-02-01T23:59:59.000Z

57

Modal Bin Hybrid Model: A Surface Area Consistent, Triple Moment Sectional Method for Use in Process-oriented Modeling of Atmospheric Aerosols  

SciTech Connect (OSTI)

A triple moment sectional method, Modal Bin Hybrid Model (MBHM), has been developed. In addition to number and mass (volume), surface area is predicted (and preserved), which is important for gas-to-particle mass transfer and light extinction cross section. The performance of MBHM was evaluated against double moment sectional (DMS) methods with various size resolutions up to BIN256 (BINx: x is number of sections over three orders of magnitude in size, ?logD = 3/x) for simulating evolution of particles under simultaneously occurring nucleation, condensation and coagulation processes. Because MBHM gives a physically consistent form of the intra-sectional distributions, errors and biases of MBHM at BIN4-8 resolution were almost equivalent to those of DMS at BIN16-32 resolution for various important variables such as the moments Mk (k: 0, 2, 3), dMk/dt, and the number and volume of particles larger than a certain diameter. Another important feature of MBHM is that only a single bin is adequate to simulate full aerosol dynamics for particles whose size distribution can be approximated by a single lognormal mode. This flexibility is useful for process-oriented (multi category and/or mixing state) modeling: primary aerosols whose size parameters would not differ substantially in time and space can be expressed by a single or a small number of modes, whereas secondary aerosols whose size changes drastically from one to several hundred nanometers can be expressed by a number of modes. Added dimensions can be applied to MBHM to represent mixing state or photo-chemical age for aerosol mixing state studies.

Kajino, Mizuo; Easter, Richard C.; Ghan, Steven J.

2013-09-10T23:59:59.000Z

58

Structural and stratigraphic evolution of the central Mississippi Canyon Area: interaction of salt tectonics and slope processes in the formation of engineering and geologic hazards  

E-Print Network [OSTI]

. The analysis focused on salt tectonics and sequence stratigraphy to develop a geologic model for the study area and its potential impact on engineering and geologic hazards. Salt in the study area was found to be established structural end-members derived from...

Brand, John Richard

2006-04-12T23:59:59.000Z

59

Investigation of periodic multilayers  

E-Print Network [OSTI]

Periodic multilayers of various periods were prepared according to an algorithm proposed by the authors. The reflectivity properties of these systems were investigated using neutron reflectometry.The obtained experimental results were compared with the theoretical expectations. In first approximation, the results proved the main features of the theoretical predictions. These promising results initiate further research of such systems.

Bodnarchuck, V; Ignatovich, V; Veres, T; Yaradaykin, S

2009-01-01T23:59:59.000Z

60

Periodic wave solutions of the Boussinesq equation  

Science Journals Connector (OSTI)

The Boussinesq equation usually arises in a physical problem as a long wave equation. The present work extends the search of periodic wave solutions for it. The Hirota bilinear method and Riemann theta function are employed in the process. We also analyse the asymptotic property of periodic waves in detail. Furthermore, it is of interest to note that well-known soliton solutions can be reduced from the periodic wave solutions.

Yi Zhang; Ling-ya Ye; Yi-neng Lv; Hai-qiong Zhao

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Budget Period 1  

Broader source: Energy.gov (indexed) [DOE]

Budget Period 1 Budget Period 1 Budget Period 2 Budget Period 3 0.0% 0.0% 0.0% PMC123.1 - Budget Justification for SF 424A Budget 0 Additional Explanations/Comments (as necessary) *IMPORTANT: In the space provided below (or as an attachment) provide a complete explanation and the full calculations used to derive the total indirect costs. If the total indirect costs are a cumulative amount of more than one calculation or rate application, the explanation and calculations should identify all rates used, along with the base they were applied to (and how the base was derived), and a total for each (along with grand total). The rates and how they are applied should not be averaged to get one indirect cost percentage. NOTE: The indirect rate should be applied to both the Federal Share and Recipient Cost Share.

62

Research Areas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Areas Areas Research Areas Print Scientists from a wide variety of fields come to the ALS to perform experiements. Listed below are some of the most common research areas covered by ALS beamlines. Below each heading are a few examples of the specific types of topics included in that category. Click on a heading to learn more about that research area at the ALS. Energy Science Photovoltaics, photosynthesis, biofuels, energy storage, combustion, catalysis, carbon capture/sequestration. Bioscience General biology, structural biology. Materials/Condensed Matter Correlated materials, nanomaterials, magnetism, polymers, semiconductors, water, advanced materials. Physics Atomic, molecular, and optical (AMO) physics; accelerator physics. Chemistry Surfaces/interfaces, catalysts, chemical dynamics (gas-phase chemistry), crystallography, physical chemistry.

63

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Loveland Area Projects November 29-30, 2011 2 Agenda * Overview of Western Area Power Administration * Post-1989 Loveland Area Projects (LAP) Marketing Plan * Energy Planning and Management Program * Development of the 2025 PMI Proposal * 2025 PMI Proposal * 2025 PMI Comment Period & Proposal Information * Questions 3 Overview of Western Area Power Administration (Western) * One of four power marketing administrations within the Department of Energy * Mission: Market and deliver reliable, renewable, cost-based Federal hydroelectric power and related services within a 15-state region of the central and western U.S. * Vision: Provide premier power marketing and transmission services Rocky Mountain Region (RMR) is one of five regional offices 4 Rocky Mountain Region

64

A Study to Determine the Effectiveness of Agriculture/Natural Resource Program Area Committees on the Texas AgriLife Extension Service Program Planning Process  

E-Print Network [OSTI]

of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF EDUCATION August 2011 Major Subject: Agricultural Leadership, Education, and Communications A STUDY TO DETERMINE..., Jack Elliot August 2011 Major Subject: Agricultural Leadership, Education, and Communications iii ABSTRACT A Study to Determine the Effectiveness of Agriculture/Natural Resource Program Area Committees on the Texas AgriLife Extension...

Weems, Whit Holland

2011-10-21T23:59:59.000Z

65

Research Areas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Areas Print Research Areas Print Scientists from a wide variety of fields come to the ALS to perform experiements. Listed below are some of the most common research areas covered by ALS beamlines. Below each heading are a few examples of the specific types of topics included in that category. Click on a heading to learn more about that research area at the ALS. Energy Science Photovoltaics, photosynthesis, biofuels, energy storage, combustion, catalysis, carbon capture/sequestration. Bioscience General biology, structural biology. Materials/Condensed Matter Correlated materials, nanomaterials, magnetism, polymers, semiconductors, water, advanced materials. Physics Atomic, molecular, and optical (AMO) physics; accelerator physics. Chemistry Surfaces/interfaces, catalysts, chemical dynamics (gas-phase chemistry), crystallography, physical chemistry.

66

coherence area  

Science Journals Connector (OSTI)

1....In an electromagnetic wave, such as a lightwave or a radio wave, the area of a surface (a) every point on which the surface is perpendicular to the direction of propagation, (b) over which the e...

2001-01-01T23:59:59.000Z

67

Periodic pumping tests  

Science Journals Connector (OSTI)

......pumping period. The considered penetration depth (eq. 6) constitutes...well transmitted beyond the penetration depth. It is only a question...measurable. In contrast, flow rate measured at the pumping well...subsurface volume represented by penetration depth.) We cannot exclude......

Jörg Renner; Mareike Messar

2006-10-01T23:59:59.000Z

68

area | OpenEI  

Open Energy Info (EERE)

area area Dataset Summary Description These estimates are derived from a composite of high resolution wind resource datasets modeled for specific countries with low resolution data originating from the National Centers for Environmental Prediction (United States) and the National Center for Atmospheric Research (United States) as processed for use in the IMAGE model. The high resolution datasets were produced by the National Renewable Energy Laboratory (United States), Risø DTU National Laboratory (Denmark), the National Institute for Space Research (Brazil), and the Canadian Wind Energy Association. The data repr Source National Renewable Energy Laboratory Date Released Unknown Date Updated Unknown Keywords area capacity clean energy international National Renewable Energy Laboratory

69

Method of particle trajectory recognition in particle flows of high particle concentration using a candidate trajectory tree process with variable search areas  

DOE Patents [OSTI]

The application relates to particle trajectory recognition from a Centroid Population comprised of Centroids having an (x, y, t) or (x, y, f) coordinate. The method is applicable to visualization and measurement of particle flow fields of high particle. In one embodiment, the centroids are generated from particle images recorded on camera frames. The application encompasses digital computer systems and distribution mediums implementing the method disclosed and is particularly applicable to recognizing trajectories of particles in particle flows of high particle concentration. The method accomplishes trajectory recognition by forming Candidate Trajectory Trees and repeated searches at varying Search Velocities, such that initial search areas are set to a minimum size in order to recognize only the slowest, least accelerating particles which produce higher local concentrations. When a trajectory is recognized, the centroids in that trajectory are removed from consideration in future searches.

Shaffer, Franklin D.

2013-03-12T23:59:59.000Z

70

Effective Rate Period  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fiscal Year 2014 Fiscal Year 2014 Effective Rate Period As of Beginning of the FY 10/01/2013 - 09/30/2014 Mid-Year Changes (if applicable) 10/01/2013 - 09/30/2014 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement $73,441,557 CV-F13 Base Resource Revenue Requirement $69,585,875 First Preference Revenue Requirement $3,855,682

71

Geologic processes in the RWMC area, Idaho National Engineering Laboratory: Implications for long term stability and soil erosion at the radioactive waste management complex  

SciTech Connect (OSTI)

The Radioactive Waste Management Complex (RWMC) is the disposal and storage facility for low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). Transuranic waste and mixed wastes were also disposed at the RWMC until 1970. It is located in the southwestern part of the INEL about 80 km west of Idaho Falls, Idaho. The INEL occupies a portion of the Eastern Snake River Plain (ESRP), a low-relief, basalt, and sediment-floored basin within the northern Rocky Mountains and northeastern Basin and Range Province. It is a cool and semiarid, sagebrush steppe desert characterized by irregular, rolling terrain. The RWMC began disposal of INEL-generated wastes in 1952, and since 1954, wastes have been accepted from other Federal facilities. Much of the waste is buried in shallow trenches, pits, and soil vaults. Until about 1970, trenches and pits were excavated to the basalt surface, leaving no sediments between the waste and the top of the basalt. Since 1970, a layer of sediment (about 1 m) has been left between the waste and the basalt. The United States Department of Energy (DOE) has developed regulations specific to radioactive-waste disposal, including environmental standards and performance objectives. The regulation applicable to all DOE facilities is DOE Order 5820.2A (Radioactive Waste Management). An important consideration for the performance assessment of the RWMC is the long-term geomorphic stability of the site. Several investigators have identified geologic processes and events that could disrupt a radioactive waste disposal facility. Examples of these {open_quotes}geomorphic hazards{close_quotes} include changes in stream discharge, sediment load, and base level, which may result from climate change, tectonic processes, or magmatic processes. In the performance assessment, these hazards are incorporated into scenarios that may affect the future performance of the RWMC.

Hackett, W.R.; Tullis, J.A.; Smith, R.P. [and others

1995-09-01T23:59:59.000Z

72

Geochemical Processes Data Package for the Vadose Zone in the Single-Shell Tank Waste Management Areas at the Hanford Site  

SciTech Connect (OSTI)

This data package discusses the geochemistry of vadose zone sediments beneath the single-shell tank farms at the U.S. Department of Energy’s (DOE’s) Hanford Site. The purpose of the report is to provide a review of the most recent and relevant geochemical process information available for the vadose zone beneath the single-shell tank farms and the Integrated Disposal Facility. Two companion reports to this one were recently published which discuss the geology of the farms (Reidel and Chamness 2007) and groundwater flow and contamination beneath the farms (Horton 2007).

Cantrell, Kirk J.; Zachara, John M.; Dresel, P. Evan; Krupka, Kenneth M.; Serne, R. Jeffrey

2007-09-28T23:59:59.000Z

73

Multifunctional periodic cellular metals  

Science Journals Connector (OSTI)

...webs or truss members. Recent results indicate that...In Fourth Conf. on Aerospace Materials, Processes...continuous in one direction. Recent advances in topology design and...Department of Materials Science and Engineering, University...

2006-01-01T23:59:59.000Z

74

Ball Packings with Periodic Constraints  

Science Journals Connector (OSTI)

We call a periodic ball packing in $$d$$d-dimensional Euclidean space periodically (resp. strictly) jammed with respect to a period lattice $$\\varLambda $$¿ if there are no nontrivial motions of the balls that preserve $$\\varLambda $$¿ (resp. that maintain ... Keywords: 52C17, Ball packings, Jamming, Periodic packings, Rigidity, Tensegrities

Robert Connelly, Jeffrey D. Shen, Alexander D. Smith

2014-12-01T23:59:59.000Z

75

Combining steam-methane reforming, water-gas shift, and CO{sub 2} removal in a single-step process for hydrogen production. Final report for period March 15, 1997 - December 14, 2000  

SciTech Connect (OSTI)

The objective of the research project was to determine the feasibility of a simpler, more energy-efficient process for the production of 95+% H{sub 2} from natural gas, and to collect sufficient experimental data on the effect of reaction parameters to guide additional larger-scale process development. The overall objectives were accomplished. 95+% H{sub 2} was produced in a single reaction step by adding a calcium-based CO{sub 2} acceptor to standard Ni-based reforming catalyst. The spent acceptor was successfully regenerated and used in a number of reaction steps with only moderate loss in activity as the number of cycles increased. Sufficient experimental data were collected to guide further larger-scale experimental work designed to investigate the economic feasibility of the process.

Alejandro Lopez Ortiz; Bhaskar Balasubramanian; Douglas P. Harrison

2001-02-01T23:59:59.000Z

76

Broadband solar absorption enhancement via periodic  

E-Print Network [OSTI]

Broadband solar absorption enhancement via periodic nanostructuring of electrodes Michael M. Adachi Department of Electrical and Computer Engineering, University of Toronto, Toronto, Ontario M5S 3G4, Canada, 2 Province, 230009, P. R. China. Solution processed colloidal quantum dot (CQD) solar cells have great

77

Ball Packings with Periodic Constraints  

E-Print Network [OSTI]

We call a periodic ball packing in d-dimensional Euclidean space periodically (strictly) jammed with respect to a period lattice if there are no nontrivial motions of the balls that preserve the period (that maintain some period with smaller or equal volume). In particular, we call a packing consistently periodically (strictly) jammed if it is periodically (strictly) jammed on every one of its periods. After extending a well-known bar framework and stress condition to strict jamming, we prove that a packing with period Lambda is consistently strictly jammed if and only if it is strictly jammed with respect to Lambda and consistently periodically jammed. We next extend a result about rigid unit mode spectra in crystallography to characterize periodic jamming on sublattices. After that, we prove that there are finitely many strictly jammed packings of m unit balls and other similar results. An interesting example shows that the size of the first sublattice on which a packing is first periodically unjammed is not bounded. Finally, we find an example of a consistently periodically jammed packing of low density \\delta = \\frac{4 \\pi}{6 \\sqrt{3} + 11} + \\epsilon ~ 0.59, where \\epsilon is an arbitrarily small positive number. Throughout the paper, the statements for the closely related notions of periodic infinitesimal rigidity and affine infinitesimal rigidity for tensegrity frameworks are also given.

Robert Connelly; Jeffrey D. Shen; Alexander D. Smith

2013-01-04T23:59:59.000Z

78

Accepted by ApJ. Periodicities in Solar Flare Occurrence  

E-Print Network [OSTI]

that the periodicity near 154 days operated during cycles 19­21 (Lean & Brueckner 1989; Lean 1990; Oliver et al. 1998 of sunspot numbers generally agree with the results of sunspot area analyses (Lean & Brueckner 1989; Krivova

Bai, Taeil

79

Embedding a chaotic signature in a periodic train: can periodic signals be chaotic?  

E-Print Network [OSTI]

We show how a chaotic system can be locked to emit a periodic waveform belonging to its chaotic attractor. We numerically demonstrate our idea in a system composed of a semiconductor laser driven to chaos by optical feedback from a short external cavity. The clue is the injection of an appropriate periodic signal that modulates the phase and amplitude of the intra-cavity radiation, a chaotic analogy of conventional mode-locking. The result is a time process that manifests a chaotic signature embedded in a long-scale periodic train.

Antonio Mecozzi; Cristian Antonelli

2008-12-11T23:59:59.000Z

80

Southeast Idaho Area Links  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Focus Area Summary  

Broader source: Energy.gov (indexed) [DOE]

information provided was consolidated from the original five focus areas for the EM information provided was consolidated from the original five focus areas for the EM Corporate QA Board. The status of QAP/QIP approvals etc. was accurate at the time of posting; however, additional approvals may have been achieved since that time. If you have any questions about the information provided, please contact Bob Murray at robert.murray@em.doe.gov Task # Task Description Status 1.1 Develop a brief questionnaire to send out to both commercial and EM contractors to describe their current approach for identifying the applicable QA requirements for subcontractors, tailoring the requirements based upon risk, process for working with procurement to ensure QA requirements are incorporated into subcontracts, and implementing verification of requirement flow-down by their

82

Focus Area 3 Deliverables  

Broader source: Energy.gov (indexed) [DOE]

3 - Commercial Grade item and Services 3 - Commercial Grade item and Services Dedication Implementation and Nuclear Services Office of Environmental Management And Energy Facility Contractors Group Quality Assurance Improvement Project Plan Project Focus Area Task # and Description Deliverable Project Area 3-Commercial Grade Item and Services Dedication 3.1-Complete a survey of selected EM contractors to identify the process and basis for their CGI dedication program including safety classification of items being dedicated for nuclear applications within their facilities Completed Survey Approvals: Yes/No/NA Project Managers: S. Waisley, D. Tuttel Yes Executive Committee: D. Chung, J. Yanek, N. Barker, D. Amerine No EM QA Corporate Board: No Energy Facility Contractors Group

83

borrow_area.cdr  

Office of Legacy Management (LM)

information information at Weldon Spring, Missouri. This site is managed by the U.S. Department of Energy Office of Legacy Management. developed by the former WSSRAP Community Relations Department to provide comprehensive descriptions of key activities that took place throughout the cleanup process The Missouri Department of Conservation (MDC) approved a plan on June 9, 1995, allowing the U.S. Department of Energy (DOE) at the Weldon Spring Site Remedial Action Project (WSSRAP) to excavate nearly 2 million cubic yards of clay material from land in the Weldon Spring Conservation Area. Clay soil from a borrow area was used to construct the permanent disposal facility at the Weldon Spring site. Clay soil was chosen to construct the disposal facility because it has low permeability when

84

Periodicities in gamma ray bursts  

Science Journals Connector (OSTI)

Gamma ray burst models based on magnetic neutron stars face a problem of account for the scarcity of observed periods. Both this scarcity and the typical period found when any is detected are explained if the neutron stars are accreting in binary systems

Kent S. Wood

1984-01-01T23:59:59.000Z

85

Teleseismic-Seismic Monitoring At Coso Geothermal Area (2005) | Open Energy  

Open Energy Info (EERE)

Coso Geothermal Area (2005) Coso Geothermal Area (2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Coso Geothermal Area (2005) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Teleseismic-Seismic Monitoring Activity Date 2005 Usefulness not indicated DOE-funding Unknown Exploration Basis More detailed analysis of microearthquakes over a longer period of time Notes The permanent 18-station network of three-component digital seismometers at the seismically active Coso geothermal area, California, provides high-quality microearthquake (MEQ) data that are well suited to investigating temporal variations in structure related to processes within the geothermal reservoir. A preliminary study (Julian, et al. 2003; Julian

86

Rehabilitating Aquatic Ecosystems in Developed Areas  

Science Journals Connector (OSTI)

Efforts to restore watershed and aquatic ecosystem processes in urban areas are constrained by...rehabilitation and enhancement are preferred over restoration when referring to improving environmental conditions ...

Kathleen G. Maas-Hebner

2014-01-01T23:59:59.000Z

87

Periodic  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

04 04 by C.G. Wohl (LBNL). Adapted from the Commission of Atomic Weights and Isotopic Abundances, "Atomic Weights of the Elements 1995," Pure and Applied Chemistry 68, 2339 (1996), and G. Audi and A.H. Wapstra, "The 1993 Mass Evaluation," Nucl. Phys. A565, 1 (1993). The atomic number (top left) is the number of protons in the nucleus. The atomic mass (bottom) is weighted by isotopic abundances in the Earth's surface. For a new determination of atomic masses, not weighted by abundances, see G. Audi, A.H. Wapstra, and C. Thibault, Nucl. Phys. A729, 337 (2003). Atomic masses are relative to the mass of the carbon-12 isotope, defined to be exactly 12 unified atomic mass units (u). Errors range from 1 to 9 in the last digit quoted. Relative isotopic abundances often vary considerably, both in natural and commercial samples. A number in parentheses is the mass of the longest-lived

88

Observable coherence theory for statistically periodic fields Brynmor J. Davis*  

E-Print Network [OSTI]

Observable coherence theory for statistically periodic fields Brynmor J. Davis* The Beckman processes is used to develop classical coherence theory for the measurement of statistically periodicRevA.76.043843 PACS number s : 42.25.Kb, 42.60.Mi, 42.65.Re I. INTRODUCTION Coherence theory 1

Bhargava, Rohit

89

Site Monitoring Area Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

90

Extension of Comment Period on the Draft Integrated, Interagency  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on the Draft Integrated, Interagency Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on

91

Extension of Comment Period on Improving Performance of Federal Permitting  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

92

Extension of Comment Period on Improving Performance of Federal Permitting  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

93

The role of money and monetary policy in crisis periods : the Euro  

E-Print Network [OSTI]

The role of money and monetary policy in crisis periods : the Euro area case Research Center ESSEC of money and monetary policy in crisis periods: the Euro area case Jonathan Benchimol and André Fourçansy on the role of money and monetary policy during crises. The role of separability between money and consumption

Boyer, Edmond

94

Performance Period Total Fee Paid  

Broader source: Energy.gov (indexed) [DOE]

Period Period Total Fee Paid 4/29/2012 - 9/30/2012 $418,348 10/1/2012 - 9/30/2013 $0 10/1/2013 - 9/30/2014 $0 10/1/2014 - 9/30/2015 $0 10/1/2015 - 9/30/2016 $0 Cumulative Fee Paid $418,348 Contract Type: Cost Plus Award Fee Contract Period: $116,769,139 November 2011 - September 2016 $475,395 $0 Fee Information Total Estimated Contract Cost $1,141,623 $1,140,948 $1,140,948 $5,039,862 $1,140,948 Maximum Fee $5,039,862 Minimum Fee Fee Available Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract September 2013 Contractor: Contract Number:

95

Nuclear criticality safety: 300 Area  

SciTech Connect (OSTI)

This Standard applies to the receipt, processing, storage, and shipment of fissionable material in the 300 Area and in any other facility under the control of the Reactor Materials Project Management Team (PMT). The objective is to establish practices and process conditions for the storage and handling of fissionable material that prevent the accidental assembly of a critical mass and that comply with DOE Orders as well as accepted industry practice.

Not Available

1991-07-31T23:59:59.000Z

96

Periodic ripples in suspended graphene  

Science Journals Connector (OSTI)

We study the mechanism of wrinkling of suspended graphene, by means of atomistic simulations. We argue that the structural instability under edge compression is the essential physical reason for the formation of periodic ripples in graphene. The ripple wavelength and out-of-plane amplitude are found to obey 1/4-power scaling laws with respect to edge compression. Our results also show that parallel displacement of the clamped boundaries can induce periodic ripples, with oscillation amplitude roughly proportional to the 1/4 power of edge displacement.

Zhao Wang and Michel Devel

2011-03-23T23:59:59.000Z

97

Making Offshore Wind Areas Available for Leasing   

Broader source: Energy.gov [DOE]

When the U.S. Department of the Interior's Bureau of Ocean Energy Management (BOEM) needed a process to delineate the bureau's proposed offshore Wind Energy Areas (WEA) into auctionable leasing areas, the agency turned to DOE's National Renewable Energy Laboratory (NREL). Under an interagency agreement, wind energy experts from NREL helped develop a process to evaluate BOEM's designated offshore WEAs in terms of energy production, resource, water depth, and other physical criteria and delineate specific WEAs into two or more leasing areas.

98

Reduction of periodic one-dimensional hopping model  

E-Print Network [OSTI]

In this research, methods of reducing a general periodic one-dimensional hopping model to a one- or two-state model, which keeps the basic properties of the original process, are discussed. This reduction also implies that, to some extent, many processes can be well described by simple two-state or even one-state models.

Yunxin Zhang

2010-07-04T23:59:59.000Z

99

2-M Probe At Winnemucca Dry Lake Area (Kratt, Et Al., 2010) | Open Energy  

Open Energy Info (EERE)

Winnemucca Dry Lake Area (Kratt, Et Al., 2010) Winnemucca Dry Lake Area (Kratt, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: 2-M Probe At Winnemucca Dry Lake Area (Kratt, Et Al., 2010) Exploration Activity Details Location Winnemucca Dry Lake Area Exploration Technique 2-M Probe Activity Date Usefulness useful DOE-funding Unknown Notes More than 20 2-meter-deep temperatures were measured adjacent to these selected towers in a two-day period of November 2007. No obvious zones of temperature anomalies were detected. We were unable to clearly ascertain the background temperature but the spatial distribution of the data did not point to a broader zone of thermal highs. At both of these tufa localities, the process of inserting 2-meterlong probes into the ground was

100

Down hole periodic seismic generator  

DOE Patents [OSTI]

A down hole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Advanced downhole periodic seismic generator  

DOE Patents [OSTI]

An advanced downhole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

1991-07-16T23:59:59.000Z

102

Long-Period Solar Variability  

SciTech Connect (OSTI)

Terrestrial climate records and historical observations of the Sun suggest that the Sun undergoes aperiodic oscillations in radiative output and size over time periods of centuries and millenia. Such behavior can be explained by the solar convective zone acting as a nonlinear oscillator, forced at the sunspot-cycle frequency by variations in heliomagnetic field strength. A forced variant of the Lorenz equations can generate a time series with the same characteristics as the solar and climate records. The timescales and magnitudes of oscillations that could be caused by this mechanism are consistent with what is known about the Sun and terrestrial climate.

GAUTHIER,JOHN H.

2000-07-20T23:59:59.000Z

103

Porous siliconformation and etching process for use in silicon micromachining  

DOE Patents [OSTI]

A reproducible process for uniformly etching silicon from a series of micromechanical structures used in electrical devices and the like includes providing a micromechanical structure having a silicon layer with defined areas for removal thereon and an electrochemical cell containing an aqueous hydrofluoric acid electrolyte. The micromechanical structure is submerged in the electrochemical cell and the defined areas of the silicon layer thereon are anodically biased by passing a current through the electrochemical cell for a time period sufficient to cause the defined areas of the silicon layer to become porous. The formation of the depth of the porous silicon is regulated by controlling the amount of current passing through the electrochemical cell. The micromechanical structure is then removed from the electrochemical cell and submerged in a hydroxide solution to remove the porous silicon. The process is subsequently repeated for each of the series of micromechanical structures to achieve a reproducibility better than 0.3%.

Guilinger, Terry R. (Albuquerque, NM); Kelly, Michael J. (Albuquerque, NM); Martin, Jr., Samuel B. (Albuquerque, NM); Stevenson, Joel O. (Albuquerque, NM); Tsao, Sylvia S. (Albuquerque, NM)

1991-01-01T23:59:59.000Z

104

Regulating new construction in historic areas  

E-Print Network [OSTI]

This study is an examination of how the restrictiveness of different design regulations impacts the process of new construction in historic areas. The North End, South End, and Back Bay neighborhoods of Boston were identified ...

Sellers-Garcia, Oliver

2006-01-01T23:59:59.000Z

105

New subdwarf B star periods  

E-Print Network [OSTI]

Subdwarf B (sdB) stars are thought to be helium burning stars with low mass hydrogen envelopes. Several evolutionary paths have been proposed to explain the formation of these systems. One of these scenarios is the evolution of the sdB progenitor within a binary system. We have looked systematically at bright sdB stars from the PG survey. By taking spectra at several different epochs we have measured the radial velocity shifts caused by the motion of the sdB star within the binary. Our data have been taken over a long time base line (2 years) which allowed us to find longer period binaries than known before. Here we present results for 29 sdB systems.

L. Morales-Rueda; P. F. L. Maxted; T. R. Marsh; R. C. North

2002-09-26T23:59:59.000Z

106

Research Highlights Sorted by Research Area  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Area Research Area Radiation Processes | Cloud Distributions/Characterizations | Surface Properties | General Circulation and Single Column Models/Parameterizations | Aerosol Properties | Atmospheric Thermodynamics and Vertical Structures | Clouds with Low Optical [Water] Depths (CLOWD) | Vertical Velocity | Broadband Heating Rate Profile (BBHRP) | Cloud-Aerosol-Precipitation Interactions | Cloud Processes | Aerosol Processes Radiation Processes Alexandrov, M. D. Optical Depth Measurements by Shadowband Radiometers and Their Uncertainties ARM Berg, L. Surface Summertime Radiative Forcing by Shallow Cumuli at the ARM SGP ARM Bergmann, D. The Influence of Regional Anthropogenic Emission Reductions on Aerosol Direct Radiative Forcing ASR Bhattacharya, A. Burning on the Prairies ARM

107

Process / CI Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Process/Continual Improvement Rev. 11_0406 Page 1 of 6 2 Process/Continual Improvement Rev. 11_0406 Page 1 of 6 EOTA - Business Process Document Title: Process/Continual Improvement Document Number: P-012 Rev 11_0406 Document Owner: Elizabeth Sousa Backup Owner: David Rocha Approver(s): Melissa Otero Parent Document: Q-001 Quality Manual Notify of Changes: EOTA Staff Referenced Document(s): F-016 Process/Continual Improvement Form, P-001 Document Control Process, P-008 Corrective Action and Preventive Action, P-004 Business System Management Review P-012 Process/Continual Improvement Rev. 11_0406 Page 2 of 6 Revision History:

108

Please note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking facilities  

E-Print Network [OSTI]

/scooter parking areas Annual -- $154.00 ($6.42/pay period) Semester -- $51.33 2014-15 Faculty and Staff DecalPlease note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking

Mazzotti, Frank

109

Please note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking facilities  

E-Print Network [OSTI]

/scooter parking areas Annual -- $154.00 ($6.42/pay period) Semester -- $51.33 2013-14 Faculty and Staff DecalPlease note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking

Roy, Subrata

110

EFFECT OF REACTION RATE PERIODICITY ON DETONATION PROPAGATION  

E-Print Network [OSTI]

EFFECT OF REACTION RATE PERIODICITY ON DETONATION PROPAGATION Eric O. Morano and Joseph E. Shepherd through numerical simulations how the detonation propagation is affected by the heterogeneous rate but there is no accepted and accurate repre- sentation of all thermodynamic states significant to the detonation process

Barr, Al

111

Department of Energy Announces Plans for Additional Comment Period on  

Broader source: Energy.gov (indexed) [DOE]

Announces Plans for Additional Comment Period Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors November 9, 2006 - 9:38am Addthis Under Section 1221(a) of the Energy Policy Act of 2005, the Department of Energy must issue a report based on the Department's August 8 Congestion Study. In that report, the Secretary may designate as a "national interest electric transmission corridor" (National Corridor) any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers. After issuing the August 8 Congestion Study, the Department invited public comment and received comments on the study from a variety of entities

112

Material Disposal Areas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Material Disposal Areas Material Disposal Areas Material Disposal Areas Material Disposal Areas, also known as MDAs, are sites where material was disposed of below the ground surface in excavated pits, trenches, or shafts. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Material Disposal Areas at LANL The following are descriptions and status updates of each MDA at LANL. To view a current fact sheet on the MDAs, click on LA-UR-13-25837 (pdf). MDA A MDA A is a Hazard Category 2 nuclear facility comprised of a 1.25-acre, fenced, and radiologically controlled area situated on the eastern end of Delta Prime Mesa. Delta Prime Mesa is bounded by Delta Prime Canyon to the north and Los Alamos Canyon to the south.

113

MICROSCALE METABOLIC, REDOX AND ABIOTIC REACTIONS IN HANFORD 300 AREA SUBSURFACE SEDIMENTS  

SciTech Connect (OSTI)

The Hanford 300 Area is a unique site due to periodic hydrologic influence of river water resulting in changes in groundwater elevation and flow direction. This area is also highly subject to uranium remobilization, the source of which is currently believed to be the region at the base of the vadose zone that is subject to period saturation due to the changes in the water levels in the Columbia River. We found that microbial processes and redox and abiotic reactions which operate at the microscale were critical to understanding factors controlling the macroscopic fate and transport of contaminants in the subsurface. The combined laboratory and field research showed how microscale conditions control uranium mobility and how biotic, abiotic and redox reactions relate to each other. Our findings extended the current knowledge to examine U(VI) reduction and immobilization using natural 300 Area communities as well as selected model organisms on redox-sensitive and redox-insensitive minerals. Using innovative techniques developed specifically to probe biogeochemical processes at the microscale, our research expanded our current understanding of the roles played by mineral surfaces, bacterial competition, and local biotic, abiotic and redox reaction rates on the reduction and immobilization of uranium.

Beyenal, Haluk [WSU] [WSU; McLEan, Jeff [JCVI] [JCVI; Majors, Paul [PNNL] [PNNL; Fredrickson, Jim [PNNL] [PNNL

2013-11-14T23:59:59.000Z

114

Polariton dispersion of periodic quantum well structures  

Science Journals Connector (OSTI)

We studied the polariton dispersion relations of a periodic quantum-well structure with a period in the vicinity of half the exciton resonance wavelength, i.e., the Bragg structure. We classified polariton mod...

A. V. Mintsev; L. V. Butov; C. Ell; S. Mosor…

2002-11-01T23:59:59.000Z

115

Ashland Area Support Substation Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

Not Available

1992-06-01T23:59:59.000Z

116

Multi-period design of heat exchanger networks  

Science Journals Connector (OSTI)

Heat exchanger networks are an integral part of chemical processes as they recover available heat and reduce utility consumption, thereby improving the overall economics of an industrial plant. This paper focuses on heat exchanger network design for multi-period operation wherein the operating conditions of a process may vary with time. A typical example is the hydrotreating process in petroleum refineries where the operators increase reactor temperature to compensate for catalyst deactivation. Superstructure based multi-period models for heat exchanger network design have been proposed previously employing deterministic optimisation algorithms, e.g. (Aaltola, 2002; Verheyen and Zhang, 2006). Stochastic optimisation algorithms have also been applied for the design of flexible heat exchanger networks recently (Ma et al., 2007, 2008). The present work develops an optimisation approach using simulated annealing for design of heat exchanger networks for multi-period operation. A comparison of the new optimisation approach with previous deterministic optimisation based design approaches is presented to illustrate the utilisation of simulated annealing in design of optimal heat exchanger network configurations for multi-period operation.

Muhammad Imran Ahmad; Nan Zhang; Megan Jobson; Lu Chen

2012-01-01T23:59:59.000Z

117

E-Print Network 3.0 - analysis--200 area savannah Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at Kumu, near Lethem... . The area is periodically disturbed by local subsistence agriculture and occasional natural and human... , Lecythidaceae, Mimosoideae, Clusiaceae,...

118

FAQS Reference Guide- Chemical Processing  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the February 2010 edition of DOE-STD-1176-2010, Chemical Processing Functional Area Qualification Standard.

119

NSTB Summarizes Vulnerable Areas  

Broader source: Energy.gov (indexed) [DOE]

NSTB Summarizes Vulnerable Areas NSTB Summarizes Vulnerable Areas Commonly Found in Energy Control Systems Experts at the National SCADA Test Bed (NSTB) discovered some common areas of vulnerability in the energy control systems assessed between late 2004 and early 2006. These vulnerabilities ranged from conventional IT security issues to specific weaknesses in control system protocols. The paper "Lessons Learned from Cyber Security Assessments of SCADA and Energy Management Systems" describes the vulnerabilities and recommended strategies for mitigating them. It should be of use to asset owners and operators, control system vendors, system integrators, and third-party vendors interested in enhancing the security characteristics of current and future products.

120

Neutron Science Research Areas | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home | Science & Discovery | Neutron Science | Research Areas SHARE Research Areas Neutron scattering research at ORNL covers four broad research areas: biology and soft...

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Decontamination & decommissioning focus area  

SciTech Connect (OSTI)

In January 1994, the US Department of Energy Office of Environmental Management (DOE EM) formally introduced its new approach to managing DOE`s environmental research and technology development activities. The goal of the new approach is to conduct research and development in critical areas of interest to DOE, utilizing the best talent in the Department and in the national science community. To facilitate this solutions-oriented approach, the Office of Science and Technology (EM-50, formerly the Office of Technology Development) formed five Focus AReas to stimulate the required basic research, development, and demonstration efforts to seek new, innovative cleanup methods. In February 1995, EM-50 selected the DOE Morgantown Energy Technology Center (METC) to lead implementation of one of these Focus Areas: the Decontamination and Decommissioning (D & D) Focus Area.

NONE

1996-08-01T23:59:59.000Z

122

Honey Lake Geothermal Area  

Broader source: Energy.gov [DOE]

The Honey Lake geothermal area is located in Lassen County, California and Washoe County, Nevada. There are three geothermal projects actively producing electrical power. They are located at Wendel...

123

AREA 5 RWMS CLOSURE  

National Nuclear Security Administration (NNSA)

153 CLOSURE STRATEGY NEVADA TEST SITE AREA 5 RADIOACTIVE WASTE MANAGEMENT SITE Revision 0 Prepared by Under Contract No. DE-AC52-06NA25946 March 2007 DISCLAIMER Reference herein to...

124

Geographic Area Month  

U.S. Energy Information Administration (EIA) Indexed Site

Fuels by PAD District and State (Cents per Gallon Excluding Taxes) - Continued Geographic Area Month No. 1 Distillate No. 2 Distillate a No. 4 Fuel b Sales to End Users Sales for...

125

Microwave processing of ceramics  

SciTech Connect (OSTI)

Recent work in the areas of microwave processing and joining of ceramics is briefly reviewed. Advantages and disadvantages of microwave processing as well as some of the current issues in the field are discussed. Current state and potential for future commercialization of this technology is also addressed.

Katz, J.D.

1993-04-01T23:59:59.000Z

126

Microwave processing of ceramics  

SciTech Connect (OSTI)

Recent work in the areas of microwave processing and joining of ceramics is briefly reviewed. Advantages and disadvantages of microwave processing as well as some of the current issues in the field are discussed. Current state and potential for future commercialization of this technology is also addressed.

Katz, J.D.

1993-01-01T23:59:59.000Z

127

SES Probationary Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SES Probationary Period SES Probationary Period SES Probationary Period An individual's initial appointment as an SES career appointee becomes final only after the individual has served a 1-year probationary period as a career appointee. That employee's rating official must perform an assessment of the new SES's performance during the probationary period. After the one year the selecting official must certify that the appointee performed at the level of excellence expected of a senior executive during the probationary period. When a career appointee's executive qualification have been certified by a Qualifications Review Board on the basis of special or unique qualities, as described in Sec. 317.502(c), the probationary assessment must address any executive development activities the agency identified in support of the

128

Focus Areas 1 and 4 Deliverables  

Broader source: Energy.gov (indexed) [DOE]

1 - Requirements Flow Down 1 - Requirements Flow Down and Focus Area #4 - Graded Approach to Quality Assurance Graded Approach Model and Expectation Page 1 of 18 Office of Environmental Management And Energy Facility Contractors Group Quality Assurance Improvement Project Plan Project Focus Area Task # and Description Deliverable Project Area 1: Requirements Flow Down Task #1.9 - Complete White Paper covering procurement QA process flow diagram Draft White Paper and Amended Flow Diagram Project Area 4: Graded Approach Implementation Task #4.4 - In coordination with Project Focus Area #1, provide an EM expectation for application of the graded approach to procurement. EM Graded Approach Procedure for Procurements Approvals: Yes/No/NA Project Managers: S. Waisley, D. Tuttel Y

129

VacuumProcesses  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Processes Processes Manufacturing Technologies The vacuum processing capabilities in the Thin Film, Vacuum, & Packaging Laboratory encompass several areas. Capabilities include vacuum, inert gas and hydrogen firing; thermal desorption mass spectroscopy; vacuum out- gassing rate measurement; ion beam milling; and cermet densification. Capabilities * Expertise in the development of cleaning processes and materials characterization of vacuum materials and components * Vacuum and hydrogen firing of components for oxide reduction and cleaning of vacuum components * Large scale cleaning processes, vapor degreasing and vacu- um firing for large vol- ume components * Thermal desorption mass spectroscopy of material and components with controlled tem- perature ramp rates to 1500°C in a UHV

130

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

131

Bay Area | Open Energy Information  

Open Energy Info (EERE)

Bay Area Bay Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Bay Area 1.1 Products and Services in the Bay Area 1.2 Research and Development Institutions in the Bay Area 1.3 Networking Organizations in the Bay Area 1.4 Investors and Financial Organizations in the Bay Area 1.5 Policy Organizations in the Bay Area Clean Energy Clusters in the Bay Area Products and Services in the Bay Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

132

Texas Area | Open Energy Information  

Open Energy Info (EERE)

Area Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Texas Area 1.1 Products and Services in the Texas Area 1.2 Research and Development Institutions in the Texas Area 1.3 Networking Organizations in the Texas Area 1.4 Investors and Financial Organizations in the Texas Area 1.5 Policy Organizations in the Texas Area Clean Energy Clusters in the Texas Area Products and Services in the Texas Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

133

Rockies Area | Open Energy Information  

Open Energy Info (EERE)

Rockies Area Rockies Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Rockies Area 1.1 Products and Services in the Rockies Area 1.2 Research and Development Institutions in the Rockies Area 1.3 Networking Organizations in the Rockies Area 1.4 Investors and Financial Organizations in the Rockies Area 1.5 Policy Organizations in the Rockies Area Clean Energy Clusters in the Rockies Area Products and Services in the Rockies Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

134

OLED area illumination source  

DOE Patents [OSTI]

The present invention relates to an area illumination light source comprising a plurality of individual OLED panels. The individual OLED panels are configured in a physically modular fashion. Each OLED panel comprising a plurality of OLED devices. Each OLED panel comprises a first electrode and a second electrode such that the power being supplied to each individual OLED panel may be varied independently. A power supply unit capable of delivering varying levels of voltage simultaneously to the first and second electrodes of each of the individual OLED panels is also provided. The area illumination light source also comprises a mount within which the OLED panels are arrayed.

Foust, Donald Franklin (Scotia, NY); Duggal, Anil Raj (Niskayuna, NY); Shiang, Joseph John (Niskayuna, NY); Nealon, William Francis (Gloversville, NY); Bortscheller, Jacob Charles (Clifton Park, NY)

2008-03-25T23:59:59.000Z

135

Process / CI Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Post Travel Summary 11_0221 Page 1 of 3 7 Post Travel Summary 11_0221 Page 1 of 3 EOTA - Business Process Document Title: Post Travel Summary Document Number: ADMF-017 Post Travel Summary 11_0221 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ADMP-004, Contractor Travel Process Notify of Changes: EOTA Staff Referenced Document(s): ADMF-007 EOTA Pre-Travel Authorization Form ADMF-017 Post Travel Summary 11_0221 Page 2 of 3 Revision History: Rev. Description of Change 11_0221 Initial Release ADMF-017 Post Travel Summary 11_0221 Page 3 of 3

136

Identification of 300 Area Contaminants of Potential Concern for Soil  

SciTech Connect (OSTI)

This report documents the process used to identify source area contaminants of potential concern (COPCs) in support of the 300 Area remedial investigation/feasibility study (RI/FS) work plan. This report also establishes the exclusion criteria applicable for 300 Area use and the analytical methods needed to analyze the COPCs.

R.W. Ovink

2010-04-05T23:59:59.000Z

137

MEASUREMENT OF BUILDING AREAS MEASUREMENT OF BUILDING AREAS  

E-Print Network [OSTI]

) Common Use Areas All floored areas in the building for circulation and standard facilities provided and the like. These are extracts of NWPC standard method of measurement of building areas with an addition fromSection S ANNEXURE 4 MEASUREMENT OF BUILDING AREAS MEASUREMENT OF BUILDING AREAS 1. GROSS BUILDING

Wang, Yan

138

Subsurface contaminants focus area  

SciTech Connect (OSTI)

The US Department of Enregy (DOE) Subsurface Contaminants Focus Area is developing technologies to address environmental problems associated with hazardous and radioactive contaminants in soil and groundwater that exist throughout the DOE complex, including radionuclides, heavy metals; and dense non-aqueous phase liquids (DNAPLs). More than 5,700 known DOE groundwater plumes have contaminated over 600 billion gallons of water and 200 million cubic meters of soil. Migration of these plumes threatens local and regional water sources, and in some cases has already adversely impacted off-site rsources. In addition, the Subsurface Contaminants Focus Area is responsible for supplying technologies for the remediation of numerous landfills at DOE facilities. These landfills are estimated to contain over 3 million cubic meters of radioactive and hazardous buried Technology developed within this specialty area will provide efective methods to contain contaminant plumes and new or alternative technologies for development of in situ technologies to minimize waste disposal costs and potential worker exposure by treating plumes in place. While addressing contaminant plumes emanating from DOE landfills, the Subsurface Contaminants Focus Area is also working to develop new or alternative technologies for the in situ stabilization, and nonintrusive characterization of these disposal sites.

NONE

1996-08-01T23:59:59.000Z

139

Functional Area Dean's Office  

E-Print Network [OSTI]

Functional Area Dean's Office 1101 Ag & Resource Economics 1172 Animal Sciences 1171 Bio Ag Science and Pest Mgmt 1177 Hort & Landscape Architecture 1173 Soil & Crop Science 1170 Ag Colo Res Ctr 3046 Fiscal Officers Jessi Fuentes 1 1931 Val Parker 1 6953 Linda Moller 1 1441 Paula

140

Plutonium focus area  

SciTech Connect (OSTI)

To ensure research and development programs focus on the most pressing environmental restoration and waste management problems at the U.S. Department of Energy (DOE), the Assistant Secretary for the Office of Environmental Management (EM) established a working group in August 1993 to implement a new approach to research and technology development. As part of this new approach, EM developed a management structure and principles that led to the creation of specific Focus Areas. These organizations were designed to focus the scientific and technical talent throughout DOE and the national scientific community on the major environmental restoration and waste management problems facing DOE. The Focus Area approach provides the framework for intersite cooperation and leveraging of resources on common problems. After the original establishment of five major Focus Areas within the Office of Technology Development (EM-50, now called the Office of Science and Technology), the Nuclear Materials Stabilization Task Group (EM-66) followed the structure already in place in EM-50 and chartered the Plutonium Focus Area (PFA). The following information outlines the scope and mission of the EM, EM-60, and EM-66 organizations as related to the PFA organizational structure.

NONE

1996-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

QR-Coded Audio Periodic Table of the Elements: A Mobile-Learning Tool  

Science Journals Connector (OSTI)

QR-Coded Audio Periodic Table of the Elements: A Mobile-Learning Tool ... A quick response coded audio periodic table of the elements (QR-APTE) was developed using free online resources. ... (4) In this regard the existence of organized audio chemical information is highly desirable, speeding up the learning process by avoiding Braille reading. ...

Vasco D. B. Bonifácio

2012-01-30T23:59:59.000Z

142

Microsoft Word - 2.13 Area Safety Leaders 0913.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Safety Leaders Area Safety Leaders Area Safety Leaders coordinate with Supervisors, Managers and Work Leads in Technical Areas to assure that the hazards and required Personal Protective Equipment (PPE) for the area are identified and communicated to all occupants through the entrance placards. The process for determining PPE requirements and food/beverage restrictions for technical areas is described in ES&H Manual Chapter 19. Further information and templates for entrance placards are found in the LBNL Chemical Hygiene and Safety Plan, under Posting Area Entrances. The Area Safety Leader function is particularly important when users from multiple work groups occupy or use a Technical Area. In most cases, the Area Safety Leader will also be the person designated to

143

EA-1177: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area  

Broader source: Energy.gov (indexed) [DOE]

7: Salvage/Demolition of 200 West Area, 200 East Area, and 7: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants, Richland, Washington EA-1177: Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants, Richland, Washington SUMMARY This EA evaluates the environmental impacts for the proposal to salvage and demolish the 200 West Area, 200 East Area, and 300 Area steam plants and their associated steam distribution piping equipment, and ancillary facilities at the U.S. Department of Energy Hanford Site in Richland, Washington. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 21, 1996 EA-1177: Finding of No Significant Impact Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants October 21, 1996 EA-1177: Final Environmental Assessment

144

Variable-Period Undulators for Synchrotron Radiation  

SciTech Connect (OSTI)

A new and improved undulator design is provided that enables a variable period length for the production of synchrotron radiation from both medium-energy and high energy storage rings. The variable period length is achieved using a staggered array of pole pieces made up of high permeability material, permanent magnet material, or an electromagnetic structure. The pole pieces are separated by a variable width space. The sum of the variable width space and the pole width would therefore define the period of the undulator. Features and advantages of the invention include broad photon energy tunability, constant power operation and constant brilliance operation.

Shenoy, Gopal; Lewellen, John; Shu, Deming; Vinokurov, Nikolai

2005-02-22T23:59:59.000Z

145

Stratigraphy and structure of the Williams Creek area, Hinsdale, Mineral, and Archuleta counties, Colorado  

E-Print Network [OSTI]

Structure 50 50 50 52 53 54 General Statement Folds . 54 55 Pre-Cretaceous Folding. Post-Cretaceous Folding F aults GEOLOGIC HISTORY. Precambrian Eras Paleozoic Era. Mesozoic Era . Triassic Period Jurassic Period Cretaceous Period.... The area is one of considerable relief and is drained by the Piedra River and its tributarie s. Rock units cropping out within the area are of Precambrian, Jurassic, Cretaceous, Tertiary, and Quaternary ages. Paleozoic and Triassic units crop out...

Moore, George Edwards

2012-06-07T23:59:59.000Z

146

Argonne area restaurants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

area restaurants area restaurants Amber Cafe 13 N. Cass Ave. Westmont, IL 60559 630-515-8080 www.ambercafe.net Argonne Guest House Building 460 Argonne, IL 60439 630-739-6000 www.anlgh.org Ballydoyle Irish Pub & Restaurant 5157 Main Street Downers Grove, IL 60515 630-969-0600 www.ballydoylepub.com Bd's Mongolian Grill The Promenade Shopping Center Boughton Rd. & I-355 Bolingbrook, IL 60440 630-972-0450 www.gomongo.com Branmor's American Grill 300 Veterans Parkway Bolingbrook, IL 60440 630-226-9926 www.branmors.com Buca di Beppo 90 Yorktown Convenience Center Lombard, IL 60148 630-932-7673 www.bucadibeppo.com California Pizza Kitchen 551 Oakbrook Center Oak Brook, IL 60523 630-571-7800 www.cpk.com Capri Ristorante 5101 Main Street Downers Grove, IL 60516 630-241-0695 www.capriristorante.com Carrabba's Italian Grill

147

EIS-0504: Notice of Extension of Scoping Period | Department...  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period EIS-0504: Notice of Extension of Scoping Period Gulf LNG Liquefaction Project, Jackson County, Mississippi FERC extended the scoping period to September...

148

Lengthening the Storage Period of Cucumbers.  

E-Print Network [OSTI]

TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS BULLETIN NO. 576 AUGUST 1939 DIVISION OF RURAL HOME RESEARCH AND DIVISION OF HORTICULTURE 1NGTHENING THE STORAGE PERIOD OF CUCUMBERS..., in common storage. Consid- ering only loss of weight the period of common storage was increased from 1 to 7 weeks. When other factors such as palatability are taken into account, M. T. Cellophane wrapped cucumbers remained in good condition only about 10...

Hawthorn, L. R. (Leslie Rushton); Whitacre, Jessie (Jessie Opal); Yarnell, S. H. (Sidney Howe)

1939-01-01T23:59:59.000Z

149

High?frequency cutoff periodic dielectric waveguides  

Science Journals Connector (OSTI)

We report high?frequency cutoff in periodic dielectric waveguides. The guides consisted of 1?? photoresist film with a surface corrugation of up to 500 Å overlaid on fused silica substrates. At a wavelength of 1.064 ? we obtained transition between complete cutoff and propagation by variation in the periodicity of the guide of ± 30 Å. For gratings having 500?Å corrugation unobstructed propagation at 1.32 ? occurred with complete stopping of 1.064?? light.

F.W. Dabby; M.A. Saifi; A. Kestenbaum

1973-01-01T23:59:59.000Z

150

A ~60 Myr periodicity is common to marine-87Sr/86Sr, fossil biodiversity, and large-scale sedimentation: what does the periodicity reflect?  

E-Print Network [OSTI]

We find that the marine 87Sr/86Sr record shows a significant periodicity of 59.3 \\pm 3 Myr. The 87Sr/86Sr record is 171{\\deg} \\pm 12{\\deg}out of phase with a 62 (\\pm 3) Myr periodicity previously reported in the record of marine-animal diversity. These periodicities are close to 58 (\\pm 4) Myr cycles found for the number of gap-bounded sedimentary carbonate packages of North America We propose that these periodicities reflect the operation of a periodic "pulse of the Earth" in large-scale, Earth processes. These may be linked to mantle or plate-tectonic events, possibly uplift, which affects Earth's climate and oceans, and so the geochemistry, sedimentation, and biodiversity of the marine realm. Alternately, they may be linked to oscillation of the solar system normal to the plane of the galaxy.

Melott, Adrian L; Petersen, K D; McArthur, John M

2012-01-01T23:59:59.000Z

151

Process oil manufacturing process  

SciTech Connect (OSTI)

A method is described for producing a naphthenic process oil having reduced sulfur, nitrogen and polynuclear aromatics contents from a naphthenic feed containing same and having an atmospheric boiling range of about 650/sup 0/ to about 1200/sup 0/F. comprising: A. passing the feed into a first hydrotreating stage having a hydrotreating catalyst therein, the stage maintained at a temperature of about 600/sup 0/ to about 750/sup 0/F. and at a hydrogen partial pressure of about 400 to about 1500 psig, to convert at least a portion of the sulfur to hydrogen sulfide and the nitrogen to ammonia; B. passing the hydrotreated feed from the first hydrotreating stage in an intermediate stripping stage wherein hydrogen sulfide, ammonia, or both is removed; C. passing the hydrotreated feed from the intermediate stage into a second hydrotreating stage having therein a hydrotreating catalyst selected from the group consisting of nickel-molybdenum, cobalt-molybdenum, nickel-tungsten and mixtures thereof, the second hydrotreating stage maintained at a temperature lower than that of the first hydrotreating stage and at a hydrogen partial pressure ranging between about 400 and about 1,500 psig; D. monitoring the polynuclear aromatics content, the degree of saturation, or both of the product exiting the second hydrotreating stage; and, E. adjusting the temperature in the second hydrotreating stage to keep the polynuclear aromatics content, the degree of saturation, or both below a limit suitable for process oil.

Corman, B.G.; Korbach, P.F.; Webber, K.M.

1989-01-31T23:59:59.000Z

152

Geothermal Areas | Open Energy Information  

Open Energy Info (EERE)

Geothermal Areas Geothermal Areas Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Areas Geothermal Areas are specific locations of geothermal potential (e.g., Coso Geothermal Area). The base set of geothermal areas used in this database came from the 253 geothermal areas identified by the USGS in their 2008 Resource Assessment.[1] Additional geothermal areas were added, as needed, based on a literature search and on projects listed in the GTP's 2011 database of funded projects. Add.png Add a new Geothermal Resource Area Map of Areas List of Areas Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":2500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

153

Focus Area 5 Deliverables  

Broader source: Energy.gov (indexed) [DOE]

5 - Line Management Understanding of QA 5 - Line Management Understanding of QA and Oversight Top Right Quadrant: Quality Assurance Point of Contact: Sandra Waisley * Issues: Users will provide current or on-going QA issues of concern that impact work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. Example: Issue #1: Training database was not updated for a 60 day period following termination of training coordinator * Risks: Users will identify risks that impact the project (can be related to "issues" [above] or any other FPD identified risk) being done correctly, timely, and safely. Example: Risk #1: Unqualified personnel may have performed hazardous work

154

Reconstruction of spatial patterns of climatic anomalies during the medieval warm period (AD 900-1300)  

SciTech Connect (OSTI)

The workshop will focus on climatic variations during the Medieval Warm Period or Little Climatic Optimum. The nominal time interval assigned to this period is AD 900--1300, but climate information available during the century or two preceding and following this episode is welcome. The aims of the workshop will be to: examine the available evidence for the existence of this episode; assess the spatial and temporal synchronicity of the climatic signals; discuss possible forcing mechanisms; and identify areas and paleoenvironmental records where additional research efforts are needed to improve our knowledge of this period. This document consists of abstracts of eighteen papers presented at the meeting.

Diaz, H.F. [National Oceanic and Atmospheric Administration, Boulder, CO (United States). Environmental Research Labs.; Hughes, M.K. [Arizona Univ., Tucson, AZ (United States). Lab. of Tree-Ring Research

1992-12-31T23:59:59.000Z

155

Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

156

Property:TimePeriod | Open Energy Information  

Open Energy Info (EERE)

TimePeriod TimePeriod Jump to: navigation, search This is a property of type String. Pages using the property "TimePeriod" Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Not available + 2 220 kV SSSC device for power flow control (Smart Grid Project) + Jul 2009 Jul 2014 + A A complete and normalized 61850 substation (Smart Grid Project) + Oct 2009 Dec 2015 + ADELE Project AACAES (Smart Grid Project) + Dec 2009 Dec 2013 + AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration (Smart Grid Project) + 2011-2014 + AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration (Smart Grid Project) (Belgium) + 2011-2014 +

157

Assessment of Offshore Wind Energy Leasing Areas for the BOEM Massachusetts Wind Energy Area  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), under an interagency agreement with the Bureau of Ocean Energy Management (BOEM), is providing technical assistance to identify and delineate leasing areas for offshore wind energy development within the Atlantic Coast Wind Energy Areas (WEAs) established by BOEM. This report focuses on NREL's development of three delineated leasing area options for the Massachusetts (MA) WEA and the technical evaluation of these leasing areas. The overarching objective of this study is to develop a logical process by which the MA WEA can be subdivided into non-overlapping leasing areas for BOEM's use in developing an auction process in a renewable energy lease sale. NREL worked with BOEM to identify an appropriate number of leasing areas and proposed three delineation alternatives within the MA WEA based on the boundaries announced in May 2012. A primary output of the interagency agreement is this report, which documents the methodology, including key variables and assumptions, by which the leasing areas were identified and delineated.

Musial, W.; Parker, Z.; Fields, M.; Scott, G.; Elliott, D.; Draxl, C.

2013-12-01T23:59:59.000Z

158

Western Area Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Area Power Administration Customer Meeting The meeting will begin at 12:30 pm MST We have logged on early for connectivity purposes Please stand-by until the meeting begins Please be sure to call into the conference bridge at: 888-989-6414 Conf. Code 60223 If you have connectivity issues, please contact: 866-900-1011 1 Introduction ï‚— Welcome ï‚— Introductions ï‚— Purpose of Meeting â—¦ Status of the SLCA/IP Rate â—¦ SLCA/IP Marketing Plan â—¦ Credit Worthiness Policy â—¦ LTEMP EIS update â—¦ Access to Capital ï‚— Handout Materials http://www.wapa.gov/crsp/ratescrsp/default.htm 2 SLCA/IP Rate 3 1. Status of Repayment 2. Current SLCA/IP Firm Power Rate (SLIP-F9) 3. Revenue Requirements Comparison Table 4.SLCA/IP Rate 5. Next Steps

159

T-1 Training Area  

SciTech Connect (OSTI)

Another valuable homeland security asset at the NNSS is the T-1 training area, which covers more than 10 acres and includes more than 20 separate training venues. Local, County, and State first responders who train here encounter a variety of realistic disaster scenarios. A crashed 737 airliner lying in pieces across the desert, a helicopter and other small aircraft, trucks, buses, and derailed train cars are all part of the mock incident scene. After formal classroom education, first responders are trained to take immediate decisive action to prevent or mitigate the use of radiological or nuclear devices by terrorists. The Counterterrorism Operations Support Center for Radiological Nuclear Training conducts the courses and exercises providing first responders from across the nation with the tools they need to protect their communities. All of these elements provide a training experience that cannot be duplicated anywhere else in the country.

None

2014-11-07T23:59:59.000Z

160

T-1 Training Area  

ScienceCinema (OSTI)

Another valuable homeland security asset at the NNSS is the T-1 training area, which covers more than 10 acres and includes more than 20 separate training venues. Local, County, and State first responders who train here encounter a variety of realistic disaster scenarios. A crashed 737 airliner lying in pieces across the desert, a helicopter and other small aircraft, trucks, buses, and derailed train cars are all part of the mock incident scene. After formal classroom education, first responders are trained to take immediate decisive action to prevent or mitigate the use of radiological or nuclear devices by terrorists. The Counterterrorism Operations Support Center for Radiological Nuclear Training conducts the courses and exercises providing first responders from across the nation with the tools they need to protect their communities. All of these elements provide a training experience that cannot be duplicated anywhere else in the country.

None

2015-01-09T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Measurement of emission fluxes from Technical Area 54, Area G and L. Final report  

SciTech Connect (OSTI)

The emission flux (mass/time-area) of tritiated water from TA-54 was measured to support the characterization of radioactive air emissions from waste sites for the Radioactive Air Emissions Management (RAEM) program and for the Area G Performance Assessment. Measurements were made at over 180 locations during the summers of 1993 and 1994, including randomly selected locations across Area G, three suspected areas of contamination at Area G, and the property surrounding TA-54. The emission fluxes of radon were measured at six locations and volatile organic compounds (VOCs) at 30 locations. Monitoring was performed at each location over a several-hour period using the U.S. EPA flux chamber approach. Separate samples for tritiated water, radon, and VOCs were collected and analyzed in off-site laboratories. The measured tritiated water emission fluxes varied over several orders of magnitude, from background levels of about 3 pCi/m{sup 2}-min to 9.69 x 10{sup 6} pCi/m{sup 2}-min near a disposal shaft. Low levels of tritiated water were found to have migrated into Pajarito Canyon, directly south of Area G. The tritium flux data were used to generate an estimated annual emission rate of 14 Curies/yr for all of Area G, with the majority of this activity being emitted from relatively small areas adjacent to several disposal shafts. The estimated total annual release is less than 1% of the total tritium release from all LANL in 1992 and results in a negligible off-site dose. Based on the limited data available, the average emission flux of radon from Area G is estimated to be 8.1 pCi/m{sup 2}-min. The measured emission fluxes of VOCs were < 100 {mu}g/m{sup 2}-min, which is small compared with fluxes typically measured at hazardous waste landfills. The air quality impacts of these releases were evaluated in a separate report.

Eklund, B. [Radian Corp., Austin, TX (United States)

1995-03-15T23:59:59.000Z

162

Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.  

SciTech Connect (OSTI)

This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

Childs, Allen

2002-03-01T23:59:59.000Z

163

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 Process Deviation 11_0304 Page 1 of 6 0 Process Deviation 11_0304 Page 1 of 6 EOTA - Business Process Document Title: Process Deviation Document Number: P-010 Rev 11-0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-013 Process Deviation Form, P-008 Corrective/Preventive Action, F-014 Process Deviation Log, ADMP-001 Procurement Process P-010 Process Deviation 11_0304 Page 2 of 6 Revision History: Rev. Description of Change A Initial Release 08_0822 Process assigned to new owner. Process and flowchart modified to require completion of all items on F-013. 09_0122 Process and flowchart modified to reflect process modifications.

164

Processing Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Processing Science Related to the Electron Beam Melting Additive Manufacturing Process October 14 th , 2014 Ryan Dehoff Metal Additive Manufacturing Thrust Lead Manufacturing...

165

Natural Gas Processing Plants in the United States: 2010 Update / Appendix  

Gasoline and Diesel Fuel Update (EIA)

Appendix Appendix The preceding report is the most comprehensive report published by the EIA on natural gas processing plants in the United States. The data in the report for the year 2008 were collected on Form EIA-757, Natural Gas Processing Survey Schedule A, which was fielded to EIA respondents in the latter part of 2008 for the first time. This survey was used to collect information on the capacity, status, and operations of natural gas processing plants and to monitor constraints of natural gas processing plants during periods of supply disruption in areas affected by an emergency, such as a hurricane. EIA received authorization to collect information on processing plants from the Office of Management and Budget in early 2008. The form consists of two parts, Schedule A and Schedule B. Schedule A is

166

The periodic spectroscopic variability of FU Orionis  

Science Journals Connector (OSTI)

......the emergence of the energy liberated by accretion...of the central star in solar masses. The maximum...is the stellar mass in solar masses. Even in the...this could represent an economical solution to the two period...Associations and the Solar Vicinity. Kluwer, Dordrecht......

Stacie L. Powell; Mike Irwin; Jerome Bouvier; Cathie J. Clarke

2012-11-11T23:59:59.000Z

167

Coherency saturation in periodic structures with randomization  

E-Print Network [OSTI]

,28 or multicascade stimulated Raman scattering.29­31 A major example of naturally occurring spatially periodic with very reasonable precision. In the specific case of x ray transition radiation of low layers can generate resonantly enhanced radiation in the hard x ray domain with almost unhampered

Kaplan, Alexander

168

Many-body energy localization transition in periodically driven systems  

SciTech Connect (OSTI)

According to the second law of thermodynamics the total entropy of a system is increased during almost any dynamical process. The positivity of the specific heat implies that the entropy increase is associated with heating. This is generally true both at the single particle level, like in the Fermi acceleration mechanism of charged particles reflected by magnetic mirrors, and for complex systems in everyday devices. Notable exceptions are known in noninteracting systems of particles moving in periodic potentials. Here the phenomenon of dynamical localization can prevent heating beyond certain threshold. The dynamical localization is known to occur both at classical (Fermi–Ulam model) and at quantum levels (kicked rotor). However, it was believed that driven ergodic systems will always heat without bound. Here, on the contrary, we report strong evidence of dynamical localization transition in both classical and quantum periodically driven ergodic systems in the thermodynamic limit. This phenomenon is reminiscent of many-body localization in energy space. -- Highlights: •A dynamical localization transition in periodically driven ergodic systems is found. •This phenomenon is reminiscent of many-body localization in energy space. •Our results are valid for classical and quantum systems in the thermodynamic limit. •At critical frequency, the short time expansion for the evolution operator breaks down. •The transition is associated to a divergent time scale.

D’Alessio, Luca, E-mail: dalessio@buphy.bu.edu [Physics Department, Boston University, Boston, MA 02215 (United States) [Physics Department, Boston University, Boston, MA 02215 (United States); Kavli Institute for Theoretical Physics, University of California, Santa Barbara, CA 93106 (United States); Polkovnikov, Anatoli, E-mail: asp@bu.edu [Physics Department, Boston University, Boston, MA 02215 (United States)] [Physics Department, Boston University, Boston, MA 02215 (United States)

2013-06-15T23:59:59.000Z

169

Discussion of Process Issues  

Broader source: Energy.gov (indexed) [DOE]

Study and Study and Criteria for Designation of National Interest Electric Transmission Corridors March 29, 2006 Discussion of Process Issues David Meyer Office of Electricity Delivery and Energy Reliability US Department of Energy 2 Two Basic, Interdependent Issues Geographic Scope of National Corridors Appropriate Timing for Designation of a National Corridor Interdependent because route becomes more predictable as a proposed project is refined 3 New Term: Electric Transmission Constraint Area "Constraint Area" would refer to a problem in the transmission infrastructure Usually would not have a precise locus or boundaries By designating a Constraint Area, DOE could flag an important problem - and remain agnostic about how to solve it 4 Relationship of Constraint Areas

170

Safety analysis, 200 Area, Savannah River Plant: Separations area operations  

SciTech Connect (OSTI)

The nev HB-Line, located on the fifth and sixth levels of Building 221-H, is designed to replace the aging existing HB-Line production facility. The nev HB-Line consists of three separate facilities: the Scrap Recovery Facility, the Neptunium Oxide Facility, and the Plutonium Oxide Facility. There are three separate safety analyses for the nev HB-Line, one for each of the three facilities. These are issued as supplements to the 200-Area Safety Analysis (DPSTSA-200-10). These supplements are numbered as Sup 2A, Scrap Recovery Facility, Sup 2B, Neptunium Oxide Facility, Sup 2C, Plutonium Oxide Facility. The subject of this safety analysis, the, Plutonium Oxide Facility, will convert nitrate solutions of {sup 238}Pu to plutonium oxide (PuO{sub 2}) powder. All these new facilities incorporate improvements in: (1) engineered barriers to contain contamination, (2) barriers to minimize personnel exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.

Perkins, W.C.; Lee, R.; Allen, P.M.; Gouge, A.P.

1991-07-01T23:59:59.000Z

171

Leveraging Human Mobility for Communication in Body Area Networks  

Science Journals Connector (OSTI)

When a person is walking the RF signal strength of an on-body communication link may exhibit significant fluctuation with peak-to-peak amplitudes beyond 20 dB. Instantaneous signal strength may be noisy, but the smoothed signal typically exhibits a period ... Keywords: MAC, Wireless sensor networks, body area networks, mobility, packet scheduling, simplex algorithm

Jan-Hinrich Hauer

2014-04-01T23:59:59.000Z

172

Periodic Broadcast and Patching Services -Implementation, Measurement, and Analysis in an Internet  

E-Print Network [OSTI]

Periodic Broadcast and Patching Services - Implementation, Measurement, and Analysis in an Internet to multime- dia steams by a large number of clients. Current research in this area has focussed primarily these algorithms. We present measurements detailing the overheads associated with the various server compo- nents

Massachusetts at Amherst, University of

173

Property:Maximum Wave Height(m) at Wave Period(s) | Open Energy Information  

Open Energy Info (EERE)

Wave Height(m) at Wave Period(s) Wave Height(m) at Wave Period(s) Jump to: navigation, search Property Name Maximum Wave Height(m) at Wave Period(s) Property Type String Pages using the property "Maximum Wave Height(m) at Wave Period(s)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + 10.0 + 10-ft Wave Flume Facility + 10.0 + 11-ft Wave Flume Facility + 10.0 + 2 2-ft Flume Facility + 10.0 + 3 3-ft Wave Flume Facility + 10.0 + 5 5-ft Wave Flume Facility + 10.0 + 6 6-ft Wave Flume Facility + 10.0 + A Alden Large Flume + 0.0 + Alden Wave Basin + 1.0 + C Chase Tow Tank + 3.1 + Coastal Harbors Modeling Facility + 2.3 + Coastal Inlet Model Facility + 2.3 + D Davidson Laboratory Tow Tank + 4.0 + DeFrees Large Wave Basin + 3.0 + DeFrees Small Wave Basin + 3.0 +

174

QUESTIONS BY AREA OF INTEREST : AOI #4  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

QUESTIONS BY AREA OF INTEREST : AOI #4 QUESTIONS BY AREA OF INTEREST : AOI #4 Q4. How does the application process work? We are getting conflicting information with the Federal Stimulus money that we need to go through the Clean Cities Coalitions. Do they need to be the applicants? Or can they just be partners in our project? Same with the Transit Authorities..originally we did not need them to be a partner; however, new information states we need to have both the Clean Cities Coalitions and local Transit Authority as participants/applicants? A. For Areas of Interest #1-3, there are no restrictions to eligibility for apply for funds. While it is not mandatory that the applicant be a Clean Cities coalition (designated or non-designated), it is strongly encouraged that teams include one or more Clean Cities

175

Functional Area Qualification Standards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Assistance » Federal Technical Capability Program » Services » Assistance » Federal Technical Capability Program » Functional Area Qualification Standards Functional Area Qualification Standards Qualification Standard Qualification Standard Number Approved Aviation Manager DOE-STD-1165-2003 (CN-1) 2009-12 Aviation Safety Officer DOE-STD-1164-2003 (CN-1) 2010-01 Chemical Processing DOE-STD-1176-2010 2010-02 Civil/Structural Engineering DOE-STD-1182-2004 2004-03 Confinement Ventilation and Process Gas Treatment DOE-STD-1168-2013 2013-10 Construction Management DOE-STD-1180-2004 2004-03 Criticality Safety DOE-STD-1173-2009 2009-04 Deactivation and Decommissioning DOE-STD-1166-2003 2003-09 Electrical Systems and Safety Oversight DOE-STD-1170-2007 2007-08 Emergency Management DOE-STD-1177-2004 2004-01

176

Tanks Focus Area  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnership Partnership Project Number 08.1.3.1.7, DOE-EM 21 K. Brown (Presenter), Senior Research Scientist, CRESP/Vanderbilt U. D. Esh, M. Furman, J. Phillip, US NRC D. Kosson, S. Mahadevan, A. Garrabrants, CRESP/Vanderbilt U. H. van der Sloot, J.C.L. Meeussen, R. Comans, P. Seignette, ECN (NL) E. Garboczi, K. Snyder, J. Bullard, NIST (US) E. Samson, J. Marchand, SIMCO, Inc. (Canada) C. Langton, G. Flach, R. Seitz, G. Taylor, S. Marra, SRNL DOE Project Manager: Al Baione U.S. DOE Office of Waste Processing Technical Exchange 19-21 May 2009 2 Partnership Members Department of Energy - Office of Environmental Management (DOE-EM) * Principal supporting agency * Primary end-user Nuclear Regulatory Commission (US NRC) * Oversight & Research Divisions * Primary end-user

177

EIS-0183: Notice of Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period Extension of Scoping Period EIS-0183: Notice of Extension of Scoping Period Administration-Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California On February 23, 2009, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. In that notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by April 30, 2009. DOE/EIS-0183, Western Area Power Administration-Construction, Operation,

178

EIS-0183: Notice of Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Notice of Extension of Scoping Period Notice of Extension of Scoping Period EIS-0183: Notice of Extension of Scoping Period Administration-Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California On February 23, 2009, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. In that notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by April 30, 2009. DOE/EIS-0183, Western Area Power Administration-Construction, Operation,

179

Surface Water Management Areas (Virginia)  

Broader source: Energy.gov [DOE]

This legislation establishes surface water management areas, geographically defined surface water areas in which the State Water Control Board has deemed the levels or supply of surface water to be...

180

Focus Areas | Critical Materials Institute  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Focus Areas FA 1: Diversifying Supply FA 2: Developing Substitutes FA 3: Improving Reuse and Recycling FA 4: Crosscutting Research...

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Domain area planning utility (DAPU) for planning wireless battlefield networks  

Science Journals Connector (OSTI)

We describe the key design concepts of Domain Area Planning Utility (DAPU) developed by the PILSNER program to perform high-speed automated planning of Future Battlefield Networks (FBNs). DAPU processes multiple inputs from Resource Planning such as ...

Mariusz A. Fecko; John Unger; Sunil Samtani; Douglas Davey; Andrzej Cichocki; Bill Biagini; Paul Rego; Rick Stewart; Aristides Staikos

2009-10-01T23:59:59.000Z

182

Comprehensive Research Areas in ChBE Biomedical Engineering  

E-Print Network [OSTI]

& BioprocessingCatalysis, Reaction Kinetics & Reaction EngineeringComplex Fluids & Multiphase Flow EnergyComprehensive Research Areas in ChBE Biomedical Engineering Biotechnology, Bioinformatics & M EM S Nanotechnology Polymers & Materials Science Process Systems Engineering Pulp & Paper

Sherrill, David

183

Processing Texas Broilers.  

E-Print Network [OSTI]

to be held more than a few hours be- fore slaughter were transferred from crates to-. batteries immediately after being unloaded from the truck. They were weighed and moved to the battery-holding area to wait for slaughter later in the day or for further... are handled rapidly. Birds are weighed only at the time of purchase. With the battery system, they must be weighed a second time just before slaugh- ter to determine the weight gained or lost dur- ing the feeding period. Some processors are of the opinion...

Mountney, G. J.; Gardner, F. A. (Frederick)

1957-01-01T23:59:59.000Z

184

Geothermal resource area 6: Lander and Eureka Counties. Area development plan  

SciTech Connect (OSTI)

Geothermal Resource Area 6 includes Lander and Eureka Counties. There are several different geothermal resources ranging in temperature from 70/sup 0/F to in excess of 400/sup 0/F within this two country area. Eleven of these resources are considered major and have been selected for evaluation in this Area Development Plan. The various potential uses of the energy found at each of the 11 resource sites were determined after evaluating the study area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities. These were then compared with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 11 geothermal sites considered are summarized.

Pugsley, M.

1981-01-01T23:59:59.000Z

185

Geothermal R and D Project report for period April 1, 1976 to June 30, 1976  

Open Energy Info (EERE)

report for period April 1, 1976 to June 30, 1976 report for period April 1, 1976 to June 30, 1976 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Geothermal R and D Project report for period April 1, 1976 to June 30, 1976 Details Activities (1) Areas (1) Regions (0) Abstract: Progress during April to July 1976 in research on geothermal energy is reported. The experiments are performed in the Raft River Valley, Idaho, a hydrothermal resource site with water temperatures below 150/sup 0/C. During this period, a third well, RRGE-3 was drilled and well production was tested, testing of a direct contact heat exchanger continued, design and cost estimating continued on a 40 MW (th) organic-binary heat exchange facility, agricultural studies of irrigation with geothermal water progressed, and down-hole data was obtained from

186

Landed Costs of Imported Crude by Area  

U.S. Energy Information Administration (EIA) Indexed Site

Area Area (Dollars per Barrel) Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History Average Landed Cost 95.72 97.41 96.90 101.19 103.27 102.19 1973-2013 Persian Gulf 102.31 101.35 101.26 103.15 104.94 104.24 1996-2013 Total OPEC 101.76 101.62 101.21 103.96 105.34 105.33 1973-2013 Non OPEC 90.79 93.50 93.49 98.66 101.65 100.05 1973-2013 Selected Countries Canada 83.02 86.83 88.26 94.16 98.81 96.09 1973-2013 Colombia 101.42 100.70 99.47 102.47 106.04 105.49 1996-2013 Angola 105.56 106.32 106.73 110.43 111.75 115.03 1996-2013 Mexico 100.63 100.07 97.56 101.87 101.52 101.12 1975-2013

187

Transition Period High Water Marks - May 2009.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Period High Water Marks (THWMs) and Above-Rate-Period High Water Mark (Above-RHWM) load data for the transition period for all customers with a CHWM contract. The transition...

188

Property:AreaGeology | Open Energy Information  

Open Energy Info (EERE)

AreaGeology AreaGeology Jump to: navigation, search Property Name AreaGeology Property Type String Description A description of the area geology This is a property of type String. Subproperties This property has the following 22 subproperties: A Amedee Geothermal Area B Beowawe Hot Springs Geothermal Area Blue Mountain Geothermal Area Brady Hot Springs Geothermal Area C Chena Geothermal Area Coso Geothermal Area D Desert Peak Geothermal Area D cont. Dixie Valley Geothermal Area E East Mesa Geothermal Area G Geysers Geothermal Area K Kilauea East Rift Geothermal Area L Lightning Dock Geothermal Area Long Valley Caldera Geothermal Area R Raft River Geothermal Area Roosevelt Hot Springs Geothermal Area S Salt Wells Geothermal Area Salton Sea Geothermal Area San Emidio Desert Geothermal Area

189

Fire Hazards Analysis for the 200 Area Interim Storage Area  

SciTech Connect (OSTI)

This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards.

JOHNSON, D.M.

2000-01-06T23:59:59.000Z

190

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 Course/Analysis Initiation Process 11_0512 Page 1 of 6 10 Course/Analysis Initiation Process 11_0512 Page 1 of 6 EOTA - Business Process Document Title: Course/Analysis Initiation Process Document Number: ISDP- 010 Rev 11_0512 Document Owner: Elizabeth Sousa Backup Owner: Vickie Pleau Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-001 Technical Direction, ISDF-035 Analysis Feasibility Assessment, ISDP-010, Course Analysis Initiation Process, ISDP-015, WBT/ILT/Ex Design Process ISDP-010 Course/Analysis Initiation Process 11_0512 Page 2 of 6 Revision History: Rev. Description of Change 10_0630 Initial Release 11_0512 Modified verbiage for clarification and updated referenced documents.

191

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 Course Evaluation and Close-out Process 10_0630 Page 1 of 5 4 Course Evaluation and Close-out Process 10_0630 Page 1 of 5 EOTA - Business Process Document Title: Course Evaluation and Close-out Process Document Number: ISDP-014 Rev. 10_0630 Document Owner: Vickie Pleau Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-011, ISD History File Acceptance, ISDF-012, ISD History File Checklist ISDP-014 Course Evaluation and Close-out Process 10_0630 Page 2 of 5 Revision History: Rev. Description of Change 10_0630 Initial Release ISDP-014 Course Evaluation and Close-out Process 10_0630 Page 3 of 5 I. Purpose To effectively plan and control the process for evaluating and finalizing EOTA ILT, EX and WBT training products, assuring

192

Thermal Processes  

Broader source: Energy.gov [DOE]

Some thermal processes use the energy in various resources, such as natural gas, coal, or biomass, to release hydrogen, which is part of their molecular structure. In other processes, heat, in...

193

Photolytic Processes  

Broader source: Energy.gov [DOE]

Photolytic processes use the energy in sunlight to separate water into hydrogen and oxygen. These processes are in the very early stages of research but offer long-term potential for sustainable...

194

Subproject L-045H 300 Area Treated Effluent Disposal Facility  

SciTech Connect (OSTI)

The study focuses on the project schedule for Project L-045H, 300 Area Treated Effluent Disposal Facility. The 300 Area Treated Effluent Disposal Facility is a Department of Energy subproject of the Hanford Environmental Compliance Project. The study scope is limited to validation of the project schedule only. The primary purpose of the study is to find ways and means to accelerate the completion of the project, thereby hastening environmental compliance of the 300 Area of the Hanford site. The 300 Area'' has been utilized extensively as a laboratory area, with a diverse array of laboratory facilities installed and operational. The 300 Area Process Sewer, located in the 300 Area on the Hanford Site, collects waste water from approximately 62 sources. This waste water is discharged into two 1500 feet long percolation trenches. Current environmental statutes and policies dictate that this practice be discontinued at the earliest possible date in favor of treatment and disposal practices that satisfy applicable regulations.

Not Available

1991-06-01T23:59:59.000Z

195

Forward period analysis and the long term simulation of a periodic Hamiltonian system  

E-Print Network [OSTI]

The period of a Morse oscillator and mathematical pendulum system are obtained, accurate to 100 significant digits, by forward period analysis (FPA). From these results, the long-term [0, 10^60] (time unit) solutions, which overlap from the Planck time to the age of the universe, are computed reliably and quickly with a parallel multiple-precision Taylor series (PMT) scheme. The application of FPA to periodic systems can reduce the computation loops of long-term reliable simulation from O(t^(1+1/M)) to O(lnt+t/h0) where T is the period, M the order and h0 a constant step-size. This scheme provides a way to generate reference solutions to test other schemes' long-term simulations.

Pengfei Wang

2014-10-23T23:59:59.000Z

196

SRS - Programs - H Area Nuclear Materials Disposition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

H Area Nuclear Materials Disposition H Area Nuclear Materials Disposition The primary mission of the H-Canyon Complex is to dissolve, purify and blend-down surplus highly enriched uranium (HEU) and aluminum-clad foreign and domestic research reactor fuel to produce a low enriched uranium (LEU) solution suitable for conversion to commercial reactor fuel. A secondary mission for H-Canyon is to dissolve excess plutonium (Pu) not suitable for MOX and transfer it for vitrification in the Defense Waste Processing Facility at SRS. H Canyon was constructed in the early 1950s and began operations in 1955. The building is called a canyon because of its long rectangular shape and two continuous trenches that contains the process vessels. It is approximately 1,000 feet long with several levels to accommodate the various stages of material stabilization, including control rooms to monitor overall equipment and operating processes, equipment and piping gallery for solution transport, storage, and disposition, and unique overhead bridge cranes to support overall process operations. All work is remotely controlled, and employees are further protected from radiation by thick concrete walls.

197

EIS-0403: Notice to Extend Public Comment Period | Department...  

Broader source: Energy.gov (indexed) [DOE]

to Extend Public Comment Period EIS-0403: Notice to Extend Public Comment Period Solar Energy Development in Six Southwestern States The Department of Energy and the Bureau of...

198

EA-1566: Notice of Comment Period Extension | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1566: Notice of Comment Period Extension Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada DOE is extending the public comment period for the Yucca...

199

Emissions from Idling Trucks for Extended Time Periods | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Idling Trucks for Extended Time Periods Emissions from Idling Trucks for Extended Time Periods 2002 DEER Conference Presentation: Oak Ridge National Laboratory 2002deerlewis.pdf...

200

Catalytic Reforming Downstream Processing of Fresh Feed Input  

U.S. Energy Information Administration (EIA) Indexed Site

Process: Catalytic Reforming Catalytic Cracking Catalytic Hydrocracking Delayed and Fluid Coking Period-Unit: Monthly-Thousand Barrels per Day Annual-Thousand Barrels per Day Process: Catalytic Reforming Catalytic Cracking Catalytic Hydrocracking Delayed and Fluid Coking Period-Unit: Monthly-Thousand Barrels per Day Annual-Thousand Barrels per Day Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Process Area Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 View History U.S. 2,563 2,667 2,739 2,807 2,705 2,609 2010-2013 PADD 1 176 178 180 173 156 167 2010-2013 East Coast 166 164 163 161 140 153 2010-2013 Appalachian No. 1 9 14 16 12 15 14 2010-2013 PADD 2 642 638 668 695 677 615 2010-2013 Ind., Ill. and Ky. 426 411 426 460 450 399 2010-2013 Minn., Wis., N. Dak., S. Dak. 67 62 70 72 72 57 2010-2013 Okla., Kans., Mo.

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Down-hole periodic seismic generator  

DOE Patents [OSTI]

A down hole periodic seismic generator system is disclosed for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, H.C.; Hills, R.G.; Striker, R.P.

1982-10-28T23:59:59.000Z

202

Prime power subgroups in certain periodic groups  

E-Print Network [OSTI]

P$38E POlfRR SU89%(UPS IM CENPTAI? PERIODIC QROU1'8 A Thee1 ~ ~Ra Paalllae kxeendaria Lpptoved aa to style and oontent by& 6. P. Chairaen of Coaalttee C. c. aden visor a of epee teen t The author wishes to express his gratitude... groups will serve as a starting point. LENMA 1. 1. Let 0 be a group not the 1dentity alone. Then 0 has no proper subgroups 1f and only if 0 is s finite oyolio group of prime order. Suppose that 0 is a finite oyolio group of prime order p...

Armendariz, Efraim Pacillas

2012-06-07T23:59:59.000Z

203

A New Algorithm for Processing Interferometric Data-Stacks: SqueeSAR | Open  

Open Energy Info (EERE)

A New Algorithm for Processing Interferometric Data-Stacks: SqueeSAR A New Algorithm for Processing Interferometric Data-Stacks: SqueeSAR Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: A New Algorithm for Processing Interferometric Data-Stacks: SqueeSAR Abstract Permanent Scatterer SAR Interferometry (PSInSAR) aims to identify coherent radar targets exhibiting high phase stability over the entire observation time period. These targets often correspond to point-wise, man-made objects widely available over a city, but less present in non-urban areas. To overcome the limits of PSInSAR, analysis of interferometric data-stacks should aim at extracting geophysical parameters not only from point-wise deterministic objects (i.e., PS), but also from distributed scatterers (DS). Rather than developing hybrid processing chains where two or more

204

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 WBT/ILT/EX Course Design Process 10_0630 Page 1 of 6 5 WBT/ILT/EX Course Design Process 10_0630 Page 1 of 6 EOTA - Business Process Document Title: WBT/ILT/EX Course Design Process Document Number: ISDP-015 Rev. 10_0630 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-046 Training Design/Development Summary, ISDF-004 Design Document, ISDF-006A WBT Script Template, ISDF- 007 Lesson Plan Template, ISDF-012, ISD History File Checklist ISDP-015 WBT/ILT/EX Course Design Process 10_0630 Page 2 of 6 Revision History: Rev. Description of Change 10_0630 Initial Release ISDP-015 WBT/ILT/EX Course Design Process 10_0630 Page 3 of 6

205

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Exercise Development Process 11_0414 Page 1 of 8 7 Exercise Development Process 11_0414 Page 1 of 8 EOTA - Business Process Document Title: Exercise Development Process Document Number: ISDP-017 Revision 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Product Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-001 Technical Direction, ISDF-004 Design Document, ISDF-006 WBT Script Template, ISDF-007 Lesson Plan Template, ITTP-016 WBT Programming ISDP-017 Exercise Development Process 11_0414 Page 2 of 8 Revision History: Rev. Description of Change 10_0630 Initial Release 11_0223 Made changes to accurately reflect TPP. 11_0414 Added Derivative Classifier to step 12.0 ISDP-017 Exercise Development Process 11_0414 Page 3 of 8

206

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 Website Development-Maintenance Process 11_0419Page 1 of 6 5 Website Development-Maintenance Process 11_0419Page 1 of 6 EOTA - Business Process Document Title: Website Development-Maintenance Process Document Number: ITTP-015 Rev. 11_0419 Document Owner: Benjamin Aragon Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: ITT Referenced Document(s): ITTF-016 Website Development/Maintenance Log, ISDP-002 Training Production Process ITTP-015 Website Development-Maintenance Process 11_0419Page 2 of 6 Revision History: Rev. Description of Change A Initial Release 11_0419 Deleted decision point 2.1 and 2.2, incorporated Notifying Requester into step 2.0, modified verbiage for clarification. ITTP-015 Website Development-Maintenance Process 11_0419Page 3 of 6

207

Shillapoo Wildlife Area, Annual Report 2007-2008.  

SciTech Connect (OSTI)

This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 08 contract period October 1, 2007-September 30, 2008. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. Significant progress was realized in almost all major work types. Of particular note was progress made in tree plantings and pasture rehabilitation efforts. This year's tree planting effort included five sites detailed below and in terms of the number of plants was certainly the largest effort on the wildlife area to date in one season. The planting itself took a significant amount of time, which was anticipated. However, installation of mats and tubes took much longer than expected which impacted planned fence projects in particular. Survival of the plantings appears to be good. Improvement to the quality of waterfowl pasture habitats is evident on a number of sites due to replanting and weed control efforts. Continuing long-term weed control efforts will be key in improving this particular type of habitat. A prolonged cold, wet spring and a number of equipment breakdowns presented stumbling blocks that impacted schedules and ultimately progress on planned activities. The unusual spring weather delayed fieldwork on pasture planting projects as well as weed control and slowed the process of maintaining trees and shrubs. This time lag also caused the continued deferral of some of our fencing projects. The large brush hog mower had the driveline break twice and the smaller tractor had an engine failure that caused it to be down for over a month. We have modified our budget plan for next year to include a temporary employee that will work primarily on tree maintenance and fencing projects to make sure that we make progress in these areas and we will be investigating whether a heavier duty driveline can be obtained for the mower.

Calkins, Brian

2007-10-01T23:59:59.000Z

208

On a periodicity measure and superoscillations  

E-Print Network [OSTI]

The phenomenon of superoscillation, where band limited signals can oscillate over some time period with a frequency higher than the band limit, is not only very interesting but it also seems to offer many practical applications. The first reason is that the superoscillation frequency can be exploited to perform tasks beyond the limits imposed by the lower bandwidth of the signal. The second reason is that it is generic and applies to any wave form, be it optical, electrical, sonic, or quantum mechanical. For practical applications, it is important to overcome two problems. The first problem is that an overwhelming proportion of the energy goes into the non superoscillating part of the signal. The second problem is the control of the shape of the superoscillating part of the signal. The first problem has been recently addressed by optimization of the super oscillation yield, the ratio of the energy in the superoscillations to the total energy of the signal. The second problem may arise when the superoscillation, is to mimic a high frequency purely perodic signal. This may be required, for example, when a superoscillating force is to drive a harmonic oscillator at a high resonance frequency. In this paper the degree of periodicity of a signal is defined and applied to some yield optimized superoscillating signals.

Nehemia Schwartz; Moshe Schwartz

2014-02-13T23:59:59.000Z

209

Electromagnetic Siegert states for periodic dielectric structures  

E-Print Network [OSTI]

The formalism of Siegert states to describe the resonant scattering in quantum theory is extended to the resonant scattering of electromagnetic waves on periodic dielectric arrays. The excitation of electromagnetic Siegert states by an incident wave packet and their decay is studied. The formalism is applied to develop a theory of coupled electromagnetic resonances arising in the electromagnetic scattering problem for two such arrays separated by a distance 2h (or, generally, when the physical properties of the scattering array depend on a real coupling parameter h). Analytic properties of Siegert states as functions of the coupling parameter h are established by the Regular Perturbation Theorem which is an extension the Kato-Rellich theorem to the present case. By means of this theorem, it is proved that if the scattering structure admits a bound state in the radiation continuum at a certain value of the coupling parameter h, then there always exist regions within the structure in which the near field can be amplified as much as desired by adjusting the value of h. This establishes a rather general mechanism to control and amplify optical nonlinear effects in periodically structured planar structures possessing a nonlinear dielectric susceptibility.

Friends R. Ndangali; Sergei V. Shabanov

2011-08-09T23:59:59.000Z

210

Final DOE Areas Feasibility Study  

Office of Legacy Management (LM)

the area California Office of Historic Preservation, Northwest Information Center, Lee Jordan, Coordinator June 26, 1998 and April 12, 2000 Historical and Cultural Resources...

211

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 Functional/Job/Task Analysis Process 11_0718 Page 1 of 8 5 Functional/Job/Task Analysis Process 11_0718 Page 1 of 8 EOTA - Business Process Document Title: Functional/Job/Task Analysis Process Document Number: ISDP-005 Rev 11_0718 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: PM2 Referenced Document(s): ISDF-XXX Vision User Guide (currently being developed ) ISDP-005 Functional/Job/Task Analysis Process 11_0718 Page 2 of 8 Revision History: Rev. Description of Change 08_0410 Initial Release 10_0630 Process modified to match steps within the TPP 11_0718 Minor editorial changes; changed step 8.0 from Task-to-Training Matrix to "Analysis"-to-Training Matrix.

212

100 area excavation treatability test plan  

SciTech Connect (OSTI)

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

Not Available

1993-05-01T23:59:59.000Z

213

Ashland Area Support Substation Project : Environmental Assessment.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

214

Proposal Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

215

Northwest Area Foundation Horizons Program  

E-Print Network [OSTI]

Northwest Area Foundation Horizons Program Final Evaluation Report ­ Executive Summary Diane L by the Northwest Area Foundation in partnership with two national organizations and delivered by a number to remember that Horizons was not designed to reduce poverty, but instead to contribute to the Foundations

Amin, S. Massoud

216

Area Health Education Center of  

E-Print Network [OSTI]

Area Health Education Center of Eastern Washington Washington State University Extension's Area Health Education Center of Eastern Washington works with university and community allies to promote health for underserved and at-risk populations. It is part of a network of AHEC organiza- tions

Collins, Gary S.

217

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

218

Steady periodic gravity waves with surface tension  

E-Print Network [OSTI]

In this paper we consider two-dimensional, stratified, steady water waves propagating over an impermeable flat bed and with a free surface. The motion is assumed to be driven by capillarity (that is, surface tension) on the surface and a gravitational force acting on the body of the fluid. We prove the existence of global continua of classical solutions that are periodic and traveling. This is accomplished by first constructing a 1-parameter family of laminar flow solutions, $\\mathcal{T}$, then applying bifurcation theory methods to obtain local curves of small amplitude solutions branching from $\\mathcal{T}$ at an eigenvalue of the linearized problem. Each solution curve is then continued globally by means of a degree theoretic theorem in the spirit of Rabinowitz. Finally, we complement the degree theoretic picture by proving an alternate global bifurcation theorem via the analytic continuation method of Dancer.

Samuel Walsh

2009-11-06T23:59:59.000Z

219

Report Wildland Fire Area Hazard  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Report Wildland Fire Area Hazard Report Wildland Fire Area Hazard Report Wildland Fire Area Hazard Report wildland fire area hazards or incidents that are non-life threatening only. Call 911 for all emergencies that require immediate assistance. How to report wildland fire hazard Use the following form to report any wildland fire area hazards or incidents that are non-life threatening only. Call 911 for all emergencies that require immediate assistance. Fill out this form as completely as possible so we can better assess the hazard. All submissions will be assessed as promptly as possible. For assistance with a non-emergency situation, contact the Operations Support Center at 667-6211. Name (optional): Hazard Type (check one): Wildlife Sighting (check box if animal poses serious threat) Trails (access/egress)

220

EA-1919: Recycle of Scrap Metals Originating from Radiological Areas |  

Broader source: Energy.gov (indexed) [DOE]

EA-1919: Recycle of Scrap Metals Originating from Radiological EA-1919: Recycle of Scrap Metals Originating from Radiological Areas EA-1919: Recycle of Scrap Metals Originating from Radiological Areas Summary This Programmatic EA evaluates alternatives for the management of scrap metal originating from DOE radiological control areas, including the proposed action to allow for the recycle of uncontaminated scrap metal that meets the requirements of DOE Order 458.1. (Metals with volumetric radioactive contamination are not included in the scope of this Programmatic EA.) PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 28, 2012 EA-1919: Notice of Public Comment Period Extension Recycling of Scrap Metals Originating from Radiological Areas December 12, 2012 EA-1919: Notice of Availability of a Draft Programmatic Environmental

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Physics Division progress report for period ending September 30, 1984  

SciTech Connect (OSTI)

The research activities of the Division are centered primarily in three areas: experimental nuclear physics, experimental atomic physics, and theoretical nuclear and atomic physics. The largest of these efforts, experimental nuclear physics, is dominated by the heavy ion research program. A major responsibility under this program is the operation of the Holifield Heavy Ion Research Facility as a national user facility. During the period of this report, the facility has begun routine operation for the experimental program. The experimental atomic physics program has two components: the accelerator-based studies of basic collisional phenomena and the studies in support of the controlled fusion program. Also associated with the fusion-related studies are a plasma diagnostics program and the operation of an atomic physics data center. The theoretical physics program, both nuclear and atomic, is covered. This program has benefited this year from the success of the VAX-AP computer system and from the increase in manpower provided by the ORNL/University of Tennessee Distinguished Scientist Program. Smaller programs in applications and high-energy physics are summarized. During the period of this report, we continued to explore possible future extensions of the Holifield Facility. We retain a strong interest in a relativistic heavy-ion collider in the 10 x 10 GeV/nuclear energy range. The ideas for such a facility, described in last year's report, have been modified to utilize the HHIRF 25 MV tandem accelerator as the first stage. Finally, the report concludes with some general information on publications, Division activities, and personnel changes.

Livingston, A.B. (ed.)

1985-01-01T23:59:59.000Z

222

IUPAC Periodic Table of Isotopes for the Educational Community  

SciTech Connect (OSTI)

John Dalton first proposed the concept of atomic weights of the elements in the first decade of the nineteenth century. These atomic weights of the chemical elements were thought of as constants of nature, similar to the speed of light. Dmitri Mendeleev arranged the atomic weights of the elements in ascending order of value and used the systematic variation of their chemical properties to produce his Periodic Table of the Elements in 1869. Measurement of atomic weight values became an important chemical activity for a century and a half. Theodore Richards received a Noble Prize for his work in this area. In 1913, Fredrick Soddy found a species of radium, which had an atomic weight value of 228, compared to the familiar radium gas value of 226. Soddy coined the term 'isotope' (Greek for 'in the same place') to account for this second atomic weight value in the radium position of the Periodic Table. Both of these isotopes of radium are radioactive. Radioactive isotopes are energetically unstable and will decay (disintegrate) over time. The time it takes for one half of a sample of a given radioactive isotope to decay is the half-life of that isotope. In addition to having different atomic weight values, radium-226 and radium-228 also have different half-life values. Around the same time as Soddy's work, J.J. Thomson (discoverer of the electron) identified two stable (non-radioactive) isotopes of the same element, neon. Over the next 40 years, the majority of the known chemical elements were found to have two or more stable (or long-lived radioactive isotopes that contribute significantly to the determination of the atomic weights of the elements).

Holden N. E.; Holden,N.E.; Coplen,T.B.

2012-07-15T23:59:59.000Z

223

EA for Well Field Development at Patua Geothermal Area -  

Open Energy Info (EERE)

for Well Field Development at Patua Geothermal Area - for Well Field Development at Patua Geothermal Area - DOI-BLM-NV-C010-2011-00016-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: EA for Well Field Development at Patua Geothermal Area - DOI-BLM-NV-C010-2011-00016-EA EA at Patua Geothermal Area for Geothermal/Exploration, Geothermal/Well Field, Patua Geothermal Project Phase II General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Gradient Resources Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Exploration, Geothermal/Well Field Techniques Drilling Techniques, Thermal Gradient Holes Time Frame (days) NEPA Process Time 327 Participating Agencies Lead Agency BLM Funding Agency none provided

224

About the AreaCalc Software | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the AreaCalc Software About the AreaCalc Software AreaCalc is a tool to simplify the process of calculating the building areas needed to demonstrate energy code compliance. A spreadsheet-like interface is used to calculate window, door, skylight, roof, wall, and floor areas. These areas can then be transferred directly into REScheck(tm) where the code compliance results for those assemblies can be displayed. Publication Date: Wednesday, May 13, 2009 ab_about_the_areacalc_sofware.pdf Document Details Affiliation: DOE BECP Focus: Compliance Building Type: Residential Code Referenced: International Energy Conservation Code (IECC) Document type: Technical Articles Target Audience: Architect/Designer Builder Code Official Contractor Engineer Contacts Web Site Policies U.S. Department of Energy

225

Definition: Wide Area Monitoring, Visualization, & Control | Open Energy  

Open Energy Info (EERE)

Wide Area Monitoring, Visualization, & Control Wide Area Monitoring, Visualization, & Control Jump to: navigation, search Dictionary.png Wide Area Monitoring, Visualization, & Control Wide area monitoring and visualization requires time synchronized sensors, communications, and information processing that make it possible for the condition of the bulk power system to be observed and understood in real-time so that protective, preventative, or corrective action can be taken.[1] Related Terms Wide area, bes emergency, sustainability, smart grid References ↑ SmartGrid.gov 'Description of Functions' An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Wide_Area_Monitoring,_Visualization,_%26_Control&oldid=502579

226

LAEEBA: Link Aware and Energy Efficient Scheme for Body Area Networks  

Science Journals Connector (OSTI)

Wireless sensor networks and, particularly wireless body area networks (WBANs) are the key building blocks of upcoming generation networks. Modern health care system is one of the most popular WBAN application and a hot area of research in subject to ... Keywords: Path-loss, stability period, residual energy, routing protocol, WBAN

S. Ahmed, N. Javaid, M. Akbar, A. Iqbal, Z. A. Khan, U. Qasim

2014-05-01T23:59:59.000Z

227

Tracer Testing At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

3) 3) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Exploration Basis To develop chemical tracing procedures for geothermal areas. Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the well bore. Increased mixing during quiescent periods, between injection and

228

Faculty Areas of Expertise Engineering  

E-Print Network [OSTI]

generating plants, pipelines, electrical systems, manufacturing and processing facilities, biological systems, pipelines, rail; ultrasonics lab Trethewey, ME, condition based monitoring of machines, experimental modal analysis, signal processing Lopez de Murphy, CE, externally bonded fiber reinforced polymer repair systems

229

FAQS Qualification Card - Chemical Processing | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chemical Processing Chemical Processing FAQS Qualification Card - Chemical Processing A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-ChemicalProcessing.docx Description Chemical Processing Qualification Card More Documents & Publications FAQS Gap Analysis Qualification Card - Chemical Processing

230

Mixed Waste Focus Area program management plan  

SciTech Connect (OSTI)

This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

Beitel, G.A.

1996-10-01T23:59:59.000Z

231

E-Print Network 3.0 - asc wide area Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wayne Luk Summary: - brary code generation, and the automation of the ASC de- sign space exploration process optimizing area... segments (for table-with-polynomial method) 4....

232

E-Print Network 3.0 - area sheet task Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for: area sheet task Page: << < 1 2 3 4 5 > >> 1 Mixed integer optimization in automobile sheet metal forming processes Summary: Mixed integer optimization in automobile...

233

Nevada Geothermal Area | Department of Energy  

Energy Savers [EERE]

Nevada Geothermal Area Nevada Geothermal Area The extensive Steamboat Springs geothermal area contains three geothermal power-generating plants. The plants provide approximately...

234

The Geysers Geothermal Area | Department of Energy  

Energy Savers [EERE]

The Geysers Geothermal Area The Geysers Geothermal Area The Geysers Geothermal area, north of San Francisco, California, is the world's largest dry-steam geothermal steam field....

235

Research Areas | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

High Energy Density Laboratory Plasmas Research Areas Research Areas High Energy Density Laboratory Plasmas (HEDLP) Research Areas During open solicitations proposals are sought...

236

Exploratory Well At Raft River Geothermal Area (1976) | Open Energy  

Open Energy Info (EERE)

76) 76) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Exploratory Well At Raft River Geothermal Area (1976) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Exploratory Well Activity Date 1976 Usefulness not indicated DOE-funding Unknown Exploration Basis Second and third exploratory wells drilled Notes Raft River Geothermal Exploratory Hole No. 2, RRGE-2 drilled. During this period, a third well, RRGE-3 was also drilled and well production was tested. Down-hole data was obtained from RRGE-3. References Speake, J.L. (1 August 1976) Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion report Kunze, J.F. (1 October 1976) Geothermal R and D Project report for period April 1, 1976 to June 30, 1976

237

Solid State Division progress report for period ending March 31, 1992  

SciTech Connect (OSTI)

During this period, the division conducted a broad, interdisciplinary materials research program with emphasis on theoretical solid state physics, superconductivity, neutron scattering, synthesis and characterization of materials, ion beam and laser processing, and the structure of solids and surfaces. The High Flux Isotope Reactor was returned to full operation.

Green, P.H.; Hinton, L.W. (eds.)

1992-09-01T23:59:59.000Z

238

Release and Phase Partitioning of Metals from Anoxic Estuarine Sediments during Periods of Simulated Resuspension  

Science Journals Connector (OSTI)

Periodically, marine sediments are subjected to physical processes which resuspend them into the water column, releasing previously sequestered metals. ... Resuspension energies vary greatly over time, with particle dynamics affected by the changing force and frequency of collisions sustained by particles, along with the quantity of sediment resuspended (13). ... A particle entrainment simulator (PES) was used to perform sediment resuspensions (16). ...

Mark G. Cantwell; Robert M. Burgess; Dana R. Kester

2002-11-06T23:59:59.000Z

239

Industrial Revolutions and Consumption: A Common Model to the Various Periods of Industrialization  

E-Print Network [OSTI]

Industrial Revolutions and Consumption: A Common Model to the Various Periods of Industrialization and establish a plausible link between consumption structure evolutions and industrial revolutions. In particular, we show that an industrial revolution starts with a "smithian growth process", which is demand

Boyer, Edmond

240

HYDROLOGICAL PROCESSES Hydrol. Process. (2011)  

E-Print Network [OSTI]

HYDROLOGICAL PROCESSES Hydrol. Process. (2011) Published online in Wiley Online Library (wileyonlinelibrary.com). DOI: 10.1002/hyp.8056 Hydrological principles for sustainable management of forest of the cleanest and most plentiful freshwater supplies, sustaining many downstream communities. Given the ongoing

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

242

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Broader source: Energy.gov (indexed) [DOE]

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

243

Performance Period Total Fee Paid FY2001  

Broader source: Energy.gov (indexed) [DOE]

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

244

Effects of periodic matter in kaon regeneration  

E-Print Network [OSTI]

We study the effects of periodic matter in kaon regeneration, motivated by the possibility of parametric resonance in neutrino oscillations. The large imaginary parts of the forward kaon-nucleon scattering amplitudes and the decay width difference $\\Delta\\Gamma$ prevent a sizable enhancement of the $K_L\\to K_S$ transition probability. However, some interesting effects can be produced using regenerators made of alternating layers of two different materials. Despite the fact that the regenerator has a fixed length one can obtain different values for the probability distribution of the $K_L$ decay into a final state. Using a two-arm regenerator set up it is possible to measure the imaginary parts of the $K^0(\\bar{K}^0)$-nucleon scattering amplitudes in the correlated decays of the $\\phi$-resonance. Combining the data of the single-arm regenerator experiments with direct and reverse orders of the matter layers in the regenerator one can independently measure the CP violating parameter $\\delta$.

Evgeny Akhmedov; Augusto Barroso; Petteri Keränen

2001-07-23T23:59:59.000Z

245

Ecology of Zooplankton of the Cape Thompson Area Alaska  

E-Print Network [OSTI]

. Until recently (Ed- mondson 1955; Comita 1956), detailed studies of zooplankton in arctic Alaska had not been made. Most published works are short-term species sur- veys (Comita 1952; Johnson 1961; Juday and Muttkowski 1915; Marsh 1920; Reed 1962...-September and typically lasted until mid-May or early June. RESULTS During ice-free periods, physicoclhemical values found in aquatic habitats at Cape Thompson were simlilar to those recorded for other areas of Alaska (Comita and Edmondson 1953; Edmondson 1956...

Tash, Jerry C.; Armitage, Kenneth

1967-01-01T23:59:59.000Z

246

4853 recreation area planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures to make an area attractive for recreation users);s planificación [f] de áreas turísticas y de recreo (Planificación y apli...

2010-01-01T23:59:59.000Z

247

Focus Area Tax Credits (Maryland)  

Broader source: Energy.gov [DOE]

Focus Area Tax Credits for businesses in Baltimore City or Prince George’s County enterprise zones include: (1) Ten-year, 80% credit against local real property taxes on a portion of real property...

248

Fire in a contaminated area  

SciTech Connect (OSTI)

This document supports the development and presentation of the following accident scenario in the TWRS Final Safety Analysis Report: Fire in Contaminated Area. The calculations needed to quantify the risk associated with this accident scenario are included within.

Ryan, G.W., Westinghouse Hanford

1996-08-02T23:59:59.000Z

249

Security Area Vouching and Piggybacking  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes requirements for the Department of Energy (DOE) Security Area practice of "vouching" or "piggybacking" access by personnel. DOE N 251.40, dated 5-3-01, extends this directive until 12-31-01.

2000-06-05T23:59:59.000Z

250

Controlling Bats in Urban Areas  

E-Print Network [OSTI]

to avoid obstacles and capture insects. Bats also emit audible sounds that may be used for communi- cation. L-1913 4-08 Controlling BATS Damage In urban areas, bats may become a nuisance becauseoftheirsqueaking,scratchingandcrawl- inginattics...

Texas Wildlife Services

2008-04-15T23:59:59.000Z

251

Progress Update: M Area Closure  

ScienceCinema (OSTI)

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

Cody, Tom

2012-06-14T23:59:59.000Z

252

Transforming Parks and Protected Areas  

E-Print Network [OSTI]

Transforming Parks and Protected Areas Policy and governance in a changing world Edited by Kevin S from the British Library Library of Congress Cataloging In Publication Data Transforming parks

Bolch, Tobias

253

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 ILT Course Implementation 11_0512 Page 1 of 8 2 ILT Course Implementation 11_0512 Page 1 of 8 EOTA - Business Process Document Title: ILT Course Implementation Document Number: ISDP-012 Rev. 11_0512 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-007 Lesson Plan Template, ISDF-014 Course Announcement, ISDF-010, After Action Report, ISDF-008 ILT Student Feedback Survey, ISDF-009, Design/Development Review Checklist, ITTF-014 Publication Review and Approval, ISDF-048, After Action Report Calculation Template, ISDP-011, Exercise Course Implementation Process, ITTP-015 Website Development/Maintenance Process, ISDF-015, ILT/EX Course Support Checklist

254

Macdonald processes  

E-Print Network [OSTI]

Macdonald processes are probability measures on sequences of partitions defined in terms of nonnegative specializations of the Macdonald symmetric functions and two Macdonald parameters q,t ? [0,1). We prove several results ...

Borodin, Alexei

255

Ionic Processes  

Science Journals Connector (OSTI)

Processes based on the properties of ions, encountered in brackish and seawater, are described and discussed in this chapter. Whereas in distillation the amount and kind of salts contained in the raw feed wate...

Anthony A. Delyannis; Eurydike A. Delyannis

1974-01-01T23:59:59.000Z

256

Superconvergence of period doubling cascade in trapezoid maps  

E-Print Network [OSTI]

In the symmetric and the asymmetric trapezoid maps, as a slope of the trapezoid is increased, the period doubling cascade occurs and the symbolic sequence of periodic points is the Metropolis-Stein-Stein sequence and the convergence of the onset point of the period 2^m solution to the accumulation point is exponentially fast. We reported these results previously. In this paper, we give the detailed description of the proof on the results. Further, we study the period doubling cascade starting from period p solution and show the superconvergence of the period doubling cascade.

T. Uezu

2000-01-12T23:59:59.000Z

257

Sagebrush Flat Wildlife Area 2008 Annual Report.  

SciTech Connect (OSTI)

The Sagebrush Flat Wildlife Area is a 12,718 acre complex located in Douglas County, Washington. Four distinct management units make up the area: Bridgeport, Chester Butte, Dormaier and Sagebrush Flat. The four Units are located across a wide geographic area within Douglas County. The Units are situated roughly along a north/south line from Bridgeport in the north to the Douglas/Grant county line in the south, 60 miles away. The wildlife area was established to conserve and enhance shrubsteppe habitat for the benefit shrubsteppe obligate and dependent wildlife species. In particular, the Sagebrush Flat Wildlife Area is managed to promote the recovery of three state-listed species: Columbian sharp-tailed grouse (threatened), greater sage grouse (threatened) and the pygmy rabbit (endangered). The US Fish and Wildlife Service also list the pygmy rabbit as endangered. Wildlife area staff seeded 250 acres of old agricultural fields located on the Sagebrush Flat, Dormaier and Chester Butte units. This has been a three project to reestablish high quality shrubsteppe habitat on fields that had either been abandoned (Dormaier) or were dominated by non-native grasses. A mix of 17 native grasses and forbs, most of which were locally collected and grown, was used. First year maintenance included spot spraying Dalmatian toadflax on all sites and mowing annual weeds to reduce competition. Photo points were established and will be integral to long term monitoring and evaluation. Additional monitoring and evaluation will come from existing vegetation transects. This year weed control efforts included spot treatment of noxious weeds, particularly Dalmatian toadflax, in previously restored fields on the Bridgeport Unit (150 acres). Spot treatment also took place within fields scheduled for restoration (40 acres) and in areas where toadflax infestations are small and relatively easily contained. Where toadflax is so widespread that chemical treatment would be impractical, we use the bioagent Mecinus janthinus, available through Professor Gary Piper of Washington State University. This year we released 4,000 M. janthinus on the Bridgeport Unit at 6 separate locations. Since 2002 we have released approximately 14,400 of these insects, 80% of these on the Bridgeport Unit. Additional weed control activities included mowing and spot spraying more than 32 miles of roads, cutting and removal of annual weeds within fenced deer exclosures. We upgraded the solar powered irrigation system that supplies water to a stand of water birch trees planted in 2002. Wildlife area staff designed and built a new solar array and installed a higher capacity pump. The increased capacity will ensure that these trees receive adequate water through the hot summer months and allow us to create at least one additional stand. This project is an important part in our effort to expand the available winter habitat for sharp-tailed grouse on the Bridgeport Unit. Maintenance of fences, parking areas and roads continued during throughout the year. Two parking areas, at Chester Butte and Bridgeport, were graded and additional gravel added. Roads on the Bridgeport Unit were graded and repaired following spring runoff. Trespass and dumping issues have increased in recent years on the Bridgeport Unit. To address these problems we constructed four steel gates at access points on this unit. Each gate is tubular steel attached to 8-inch diameter steel posts, 10 feet long that are cemented into the ground. Two gates allow access to BPA substation facilities and power-line right-of ways so placement, construction and locking issues had to be coordinated with BPA's Real Estate staff in Spokane. Environmental Compliance Documentation issues were addressed again this year. This process has the potential to cause delays the completion of projects within the fiscal year. With this in mind and an eye toward the future, we requested that several projects planned for the coming years be surveyed this year. Beginning in August of 2007, area staff worked with BPA staff to identify work elements

Peterson, Dan [Washington Department of Fish and Wildlife

2008-11-03T23:59:59.000Z

258

PERIOD ERROR ESTIMATION FOR THE KEPLER ECLIPSING BINARY CATALOG  

SciTech Connect (OSTI)

The Kepler Eclipsing Binary Catalog (KEBC) describes 2165 eclipsing binaries identified in the 115 deg{sup 2} Kepler Field based on observations from Kepler quarters Q0, Q1, and Q2. The periods in the KEBC are given in units of days out to six decimal places but no period errors are provided. We present the PEC (Period Error Calculator) algorithm, which can be used to estimate the period errors of strictly periodic variables observed by the Kepler Mission. The PEC algorithm is based on propagation of error theory and assumes that observation of every light curve peak/minimum in a long time-series observation can be unambiguously identified. The PEC algorithm can be efficiently programmed using just a few lines of C computer language code. The PEC algorithm was used to develop a simple model that provides period error estimates for eclipsing binaries in the KEBC with periods less than 62.5 days: log {sigma}{sub P} Almost-Equal-To - 5.8908 + 1.4425(1 + log P), where P is the period of an eclipsing binary in the KEBC in units of days. KEBC systems with periods {>=}62.5 days have KEBC period errors of {approx}0.0144 days. Periods and period errors of seven eclipsing binary systems in the KEBC were measured using the NASA Exoplanet Archive Periodogram Service and compared to period errors estimated using the PEC algorithm.

Mighell, Kenneth J. [National Optical Astronomy Observatory, 950 North Cherry Avenue, Tucson, AZ 85719 (United States); Plavchan, Peter [NASA Exoplanet Science Institute, California Institute of Technology, Pasadena, CA 91125 (United States)

2013-06-15T23:59:59.000Z

259

Los Azufres Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

(0) 10 References Area Overview Geothermal Area Profile Location: Michoaciin, Mexico Exploration Region: Transmexican Volcanic Belt GEA Development Phase: Coordinates:...

260

Y-12 development organization technical progress report: Part 3 - metal processing, period ending September 1, 1994  

SciTech Connect (OSTI)

The authors melted and cast an aluminum-uranium (Al-U) alloy by vacuum induction melting (VIM) prealloyed buttons made by arc melting. The resulting alloy casting displayed a large compositional gradient from top to bottom. The authors sampled the resulting casting for uranium to check homogeneity. The sampling revealed that the top of the casting contained 23.5 wt% uranium, and the bottom (an average of two samples) contained 42.4 wt% uranium. Although each button contained 36.5% uranium, these analyses show that the solidified casting was inhomogeneous. If the buttons were homogeneous, the segregation occurred during induction melting, and this method may not be feasible for making AL-U alloys. If the buttons were not homogeneous, perhaps arc melting the buttons more times would have helped. Bottom pouring the Al-U melt into a mold for faster cooling could also help prevent segregation.

Northcutt, W.G. Jr.

1995-02-08T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

MULTI-PERIOD CAPACITY PLANNING FOR INTEGRATED PRODUCT-PROCESS DESIGN  

E-Print Network [OSTI]

at the expense of quality, the brand image may easily be damaged and future demand may be jeopardized. However

Saitou, Kazuhiro "Kazu"

262

EIS-0403: Public Comment Period Extension | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

403: Public Comment Period Extension 403: Public Comment Period Extension EIS-0403: Public Comment Period Extension Solar Energy Development in Six Southwestern States The Bureau of Land Management (BLM) announced a two-week extension of the public comment period for the Draft Solar Programmatic Environmental Impact Statement (Draft Solar PEIS), a joint effort with the Department of Energy. The agencies had previously provided for a 120-day public comment period on the Draft Solar PEIS. Because of numerous requests, the agencies extended the comment period by an additional two weeks beyond April 16, 2011. The comment period ran (with extension) until May 2, 2011. EIS-0403-DEIS_Second_Comment_Extension-2011.pdf More Documents & Publications EIS-0403: Notice to Extend Public Comment Period

263

An Investigation into Solar Wind Plasma Periodicities Karolen I. Paularena  

E-Print Network [OSTI]

An Investigation into Solar Wind Plasma Periodicities Karolen I. Paularena Center for Space Research, Massachusetts Institute of Technology, Cambridge, Massachusetts Received ; accepted To be submitted to Journal of Geophysical Research, 1996. Short title: SOLAR WIND PLASMA PERIODICITIES #12

Richardson, John

264

Macdonald processes  

E-Print Network [OSTI]

Macdonald processes are probability measures on sequences of partitions defined in terms of nonnegative specializations of the Macdonald symmetric functions and two Macdonald parameters q,t in [0,1). We prove several results about these processes, which include the following. (1) We explicitly evaluate expectations of a rich family of observables for these processes. (2) In the case t=0, we find a Fredholm determinant formula for a q-Laplace transform of the distribution of the last part of the Macdonald-random partition. (3) We introduce Markov dynamics that preserve the class of Macdonald processes and lead to new "integrable" 2d and 1d interacting particle systems. (4) In a large time limit transition, and as q goes to 1, the particles of these systems crystallize on a lattice, and fluctuations around the lattice converge to O'Connell's Whittaker process that describe semi-discrete Brownian directed polymers. (5) This yields a Fredholm determinant for the Laplace transform of the polymer partition function, and taking its asymptotics we prove KPZ universality for the polymer (free energy fluctuation exponent 1/3 and Tracy-Widom GUE limit law). (6) Under intermediate disorder scaling, we recover the Laplace transform of the solution of the KPZ equation with narrow wedge initial data. (7) We provide contour integral formulas for a wide array of polymer moments. (8) This results in a new ansatz for solving quantum many body systems such as the delta Bose gas.

Alexei Borodin; Ivan Corwin

2013-01-06T23:59:59.000Z

265

Recommendation 186: Option Periods in Prime Contract Language  

Broader source: Energy.gov [DOE]

The inclusion of option periods in the language of all future DOE Request for Proposals for prime contracts when appropriate.

266

Deposition Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pulsed Plasma Processing Pulsed Plasma Processing NEW: Downloadable: Invited Talk "Pulsed Metal Plasmas," presented at the 2006 AVS Meeting, San Francisco, California, November 15, 2006. (PDF, file size 8 MB). Plasma Sources for Window Coatings Deposition processes for low-emittance and solar control coatings can be improved through the use of advanced plasma technology developed at LBNL. A new type of constricted glow-discharge plasma source was selected for the 1997 R&D 100 Award. Invented by LBNL researchers Andre Anders, Mike Rubin, and Mike Dickinson, the source was designed to be compatible with industrial vacuum deposition equipment and practice. Construction is simple, rugged and inexpensive. It can operate indefinitely over a wide range of chamber pressure without any consumable parts such as filaments or grids. Several different gases including Argon, Oxygen and Nitrogen have been tested successfully.

267

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 WBT Course Implementation 11_0512 Page 1 of 7 3 WBT Course Implementation 11_0512 Page 1 of 7 EOTA - Business Process Document Title: WBT Course Implementation Document Number: ISDP-013 Rev. 11_0512 Document Owner: Elizabeth Sousa Backup Owner: Vickie Pleau Approver(s): Melissa Otero Parent Document: ISDP-002, Training Product Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-014, Course Announcement Template, ITTF-014, Publication Review and Approval, ISDF-010 After Action Report, ISDF-042 Validation & Acceptance, ISDF-048, After Action Report Calculation Template, ITTP-015, Website Development Maintenance ISDP-013 WBT Course Implementation 11_0512 Page 2 of 7 Revision History: Rev. Description of Change 10_0630 Initial Release 11_0405 Added ISDF-048, After Action Report Calculation Template to process.

268

Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.  

SciTech Connect (OSTI)

This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

Childs, Allen B.

2002-03-01T23:59:59.000Z

269

Silicon nanoparticle synthesis by short-period thermal anneals at atmospheric pressure in argon  

SciTech Connect (OSTI)

Silicon nanoparticles have been studied for a wide variety of applications including nanoelectronic, photovoltaic, and optoelectronic devices. In this work, silicon nanoparticles were synthesized by short-period annealing of silicon-on-insulator substrates to temperatures ranging between 600 and 900 deg. C in argon gas at atmospheric pressure. Two different top silicon layers were deposited by ion-beam sputtering onto oxidized substrates. The thinner 6 nm top layer samples were annealed to temperatures for 30 s periods while thicker 15 nm top layer samples were annealed for 60 s periods. For both sets of samples, nanoparticles were observed to form at all the anneal temperatures through imaging by AFM. One long-period UHV anneal study, with 30-min anneal times, observed nanoparticle formation at temperatures similar to the current work while another similar long-period UHV anneal reported nanoparticle formation only above well-defined formation temperatures that depended upon the starting top layer thickness. In the current work, the average nanoparticle radius was found to increase both with the final anneal temperature and anneal period. For the highest anneal temperatures of the 6 nm top layer samples, a changing surface topography indicated that the thinner Si source layer was becoming depleted and the nanoparticle formation process was nearing completion. No such changes were observed for the thicker 15 nm samples at the same temperatures.

Spencer, Gregory; Anyamesem-Mensah, Benedict; Galloway, Heather C.; Bandyopadhyay, Anup; Frasier, Daniel [Department of Physics, Texas State University-San Marcos, San Marcos, Texas 78666 (United States); Department of Materials Science and Engineering, University of North Texas, Denton, Texas 76207 (United States); Department of Physics, Texas State University-San Marcos, San Marcos, Texas 78666 (United States)

2011-09-15T23:59:59.000Z

270

Focus Areas | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mission » Focus Areas Mission » Focus Areas Focus Areas Safety With this focus on cleanup completion and risk reducing results, safety still remains the utmost priority. EM will continue to maintain and demand the highest safety performance. All workers deserve to go home as healthy as they were when they came to the job in the morning. There is no schedule or milestone worth any injury to the work force. Project Management EM is increasing its concentration on project management to improve its overall performance toward cost-effective risk reduction. This will involve review of validated project baselines, schedules, and assumptions about effective identification and management of risks. Instrumental in refining the technical and business approaches to project management are the senior

271

100 Areas CERCLA ecological investigations  

SciTech Connect (OSTI)

This document reports the results of the field terrestrial ecological investigations conducted by Westinghouse Hanford Company during fiscal years 1991 and 1992 at operable units 100-FR-3, 100-HR-3, 100-NR-2, 100-KR-4, and 100-BC-5. The tasks reported here are part of the Remedial Investigations conducted in support of the Comprehensive Environmental Response, compensation, and Liability Act of 1980 studies for the 100 Areas. These ecological investigations provide (1) a description of the flora and fauna associated with the 100 Areas operable units, emphasizing potential pathways for contaminants and species that have been given special status under existing state and/or federal laws, and (2) an evaluation of existing concentrations of heavy metals and radionuclides in biota associated with the 100 Areas operable units.

Landeen, D.S.; Sackschewsky, M.R.; Weiss, S.

1993-09-01T23:59:59.000Z

272

Functional Area Qualification Standard Job Task Analyses | Department of  

Broader source: Energy.gov (indexed) [DOE]

Services » Assistance » Federal Technical Capability Program » Services » Assistance » Federal Technical Capability Program » Functional Area Qualification Standard Job Task Analyses Functional Area Qualification Standard Job Task Analyses DOE Aviation Manager DOE Aviation Safety Officer Chemical Processing Civil/Structural Engineering Confinement Ventilation and Process Gas Treatment Construction Management Deactivation and Decommissioning Electrical Systems and Safety Oversight Emergency Management Environmental Compliance Environmental Restoration Facility Representative Fire Protection Engineering General Technical Base Industrial Hygiene Instrument and Controls NNSA Package Certification Engineer Nuclear Explosive Safety Study Nuclear Safety Specialist Quality Assurance Radiation Protection Safeguards and Security Safeguards and Security General Technical Base

273

Functional Area Qualification Standard Qualification Cards | Department of  

Broader source: Energy.gov (indexed) [DOE]

Services » Assistance » Federal Technical Capability Program » Services » Assistance » Federal Technical Capability Program » Functional Area Qualification Standard Qualification Cards Functional Area Qualification Standard Qualification Cards Note: 1. Save the document from the website onto your PC and close it. 2. Open the document on your PC. Answer "No" to the question regarding whether to open the documents as read only. Aviation Manager Aviation Safety Officer Chemical Processing Civil Structural Engineering Confinement Ventilation and Process Gas Treatment Construction Management Criticality Safety Deactivation and Decommissioning Electrical Systems and Safety Oversight Emergency Management Environmental Compliance Environmental Restoration Facility Maintenance Management Facility Representative Fire Protection

274

Geology of the Salt Creek area, Mason County, Texas  

E-Print Network [OSTI]

and to the entrapment of. surface water in the fractures. GEOLXiBPBOLOGY The Salt Creek area in @aeon County, Texas is located on the southwestern flank of the Llano Uplift, a structural dome which has been reduced to a topographic basin by erosional processes.... STSUCT "SALCEOL00Y IIegional Structure The Llano region, which includes the Salt Creek area, is a structural dome which has been reduced to a topographic basin by erosional processes. The dose is roughly elliptical with a maximum diameter...

Harwood, William Eugene

1959-01-01T23:59:59.000Z

275

Multi-scale process and supply chain modelling: from lignocellulosic feedstock to process and products  

Science Journals Connector (OSTI)

...immediately after designing an infrastructure network and considers a fixed infrastructure over a certain time period...classifications of supply chain. infrastructure network design supply...temperature and pressure) hybrid process for a mixture...

2011-01-01T23:59:59.000Z

276

Field Mapping At Raft River Geothermal Area (1993) | Open Energy  

Open Energy Info (EERE)

Exploration Activity: Field Mapping At Raft River Geothermal Area (1993) Exploration Activity: Field Mapping At Raft River Geothermal Area (1993) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Field Mapping Activity Date 1993 Usefulness not indicated DOE-funding Unknown Exploration Basis To determine the importance of Early to Middle Miocene period in the northern Basin and Range region. Notes New apatite fission track cooling age and track length data, supplemented by other information, point to the Early to Middle Miocene as an additional time of very significant extension-induced uplift and range formation. Many ranges in a 700-km-long north-south corridor from the Utah-Nevada-Idaho border to southernmost Nevada experience extension and major exhumation in Early to Middle Miocene time. Reconnaissance apatite ages from the Toiyabe

277

Aeromagnetic Survey At Hualalai Northwest Rift Area (Thomas, 1986) | Open  

Open Energy Info (EERE)

Aeromagnetic Survey At Hualalai Northwest Rift Area Aeromagnetic Survey At Hualalai Northwest Rift Area (Thomas, 1986) Exploration Activity Details Location Hualalai Northwest Rift Area Exploration Technique Aeromagnetic Survey Activity Date Usefulness useful DOE-funding Unknown Notes Aeromagnetic survey data for Hualalai (Godson et al., 1981) clearly indicate an elongate northwest to southeast trending zone of extremely low total magnetic field over the summit region of Hualalai that extends into the upper northwest rift zone. It is extremely unlikely that the summit region is underlain by intrusive material old enough (greater than 700,000 years of age) to have been emplaced during a period of reversed magnetic field; therefore, the only alternative explanation possible (presuming the data are accurate) is that this region is underlain by material with very

278

Resource Areas of Texas: Land.  

E-Print Network [OSTI]

days. Trans-Pecos I s.ooo.ooo Acres Vegetation: Uplands - at higher elevations, short grasses, some oak, pinon and ponder- osa pine; at lower elevations, short grasses, desert shrubs including salt-tolerant plants. Bottomlands - bunch grasses..., often covered with sea water in places. Elevation: Sea level to a few feet above sea level. Annual rainfall: 40 - 55 inches. Annual frost-free period: 270 - 300 days. Vegetation: Sedges, rushes, salt grasses. Coast Marsh 500,000 Acres Soils Dark...

Godfrey, Curtis L.; Carter, Clarence R.; McKee, Gordon S.

1967-01-01T23:59:59.000Z

279

Development of Advanced Concept for Shortening Construction Period of ABWR Plant  

SciTech Connect (OSTI)

Construction of a nuclear power plant (NPP) requires a very long period because of large amount of construction materials and many issues for negotiation among multiple sections. Shortening the construction period advances the date of return on an investment, and can also result in reduced construction cost. Therefore, the study of this subject has a very high priority for utilities. We achieved a construction period of 37 months from the first concrete work to fuel loading (F/L) (51.5 months from the inspection of the foundation (I/F) to the start of commercial operation (C/O)) at the Kashiwazaki-Kariwa NPPs No. 6 and 7 (KK-6/7), which are the first ABWR plants in the world. At TEPCO's next plant, we think that a construction period of less than 36 months (45 months from I/F to C/O) can be realized based on conventional methods such as early start of equipment installation and blocking of equipment to be brought in advance. Furthermore, we are studying the feasibility of a 21.5-month construction period (30 months from I/F to C/O) with advanced ideas and methods. The important concepts for a 21.5-month construction period are adoption of a new building structure that is the steel plate reinforced concrete (SC) structure and promotion of extensive modularization of equipment and building structure. With introducing these new concepts, we are planning the master schedule (M/S) and finding solutions to conflicts in the schedule of area release from building construction work to equipment installation work (schedule-conflicts.) In this report, we present the shortest construction period and an effective method to put it into practice for the conventional general arrangement (GA) of ABWR. In the future, we will continue the study on the improvement of building configuration and arrangements, and make clear of the concept for large composite modules of building structures and equipment. (authors)

Hiroshi Ijichi; Toshio Yamashita; Masahiro Tsutagawa; Hiroya Mori [Toshiba Corporation (Japan); Nobuaki Ooshima; Jun Miura [Hitachi Ltd. (Japan); Minoru Kanechika [Kajima Corporation (Japan); Nobuaki Miura [Shimizu Corporation (Japan)

2002-07-01T23:59:59.000Z

280

Optimization of the Area 5 Radioactive Waste Management Site Closure Cover  

SciTech Connect (OSTI)

The U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” requires that performance assessments demonstrate that releases of radionuclides to the environment are as low as reasonably achievable (ALARA). Quantitative cost benefit analysis of radiation protection options is one component of the ALARA process. This report summarizes a quantitative cost benefit analysis of closure cover thickness for the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site. The optimum cover thickness that maintains doses ALARA is shown to be the thickness with the minimum total closure cost. Total closure cost is the sum of cover construction cost and the health detriment cost. Cover construction cost is estimated based on detailed cost estimates for closure of the 92-acre Low-Level Waste Management Unit (LLWMU). The health detriment cost is calculated as the product of collective dose and a constant monetary value of health detriment in units of dollars per unit collective dose. Collective dose is the sum of all individual doses in an exposed population and has units of person-sievert (Sv). Five discrete cover thickness options ranging from 2.5 to 4.5 meters (m) (8.2 to 15 feet [ft]) are evaluated. The optimization was subject to the constraints that (1) options must meet all applicable regulatory requirements and that (2) individual doses be a small fraction of background radiation dose. Total closure cost is found to be a monotonically increasing function of cover thickness for the 92-ac LLWMU, the Northern Expansion Area, and the entire Area 5 RWMS. The cover construction cost is orders of magnitude greater than the health detriment cost. Two-thousand Latin hypercube sampling realizations of the relationship between total closure cost and cover thickness are generated. In every realization, the optimum cover thickness is 2.5 m (8.2 ft) for the 92-ac Low-Level Waste Management Unit, the Northern Expansion Area, and the entire Area 5 RWMS. The conclusions of the optimization are found to be insensitive to all input parameters, the monetary value of the health detriment over a range of values from $200,000 to $15,000,000 per person-Sv, and the period of integration of collective dose. A 2.5 m (8.2 ft) closure cover at the Area 5 RWMS can meet all applicable regulatory requirements and maintain radionuclide releases ALARA.

Shott, Greg; Yucel, Vefa

2009-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Measurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF Project  

E-Print Network [OSTI]

dedicated to the study of the processes leading to air pollution events over the Paris area. The project, pollution levels in the Paris area due to concentrated activity have become a major health issue. CurrentMeasurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF

Paris-Sud XI, Université de

282

Justification for Continued Operation of the SRS Saltstone Facility (Z-Area)  

SciTech Connect (OSTI)

Saltstone Production and Disposal Facilities (Z-Area) are a part of the Defense Waste Processing Facilities (DWPF). Z-Area facilities are just one segment of an integrated waste management and disposal system located at the Savannah River Site (SRS). The bases for the Justification of Continuing Operations (JCO) of the Saltstone Production and Disposal Facilities (Z-Area) at SRS are provided.

Wagner, W.A.

1999-01-20T23:59:59.000Z

283

Apparatus and method for selective area deposition of thin films on electrically biased substrates  

DOE Patents [OSTI]

An ion beam deposition process for selective area deposition on a polarized substrate uses a potential applied to the substrate which allows the ionized particles to reach into selected areas for film deposition. Areas of the substrate to be left uncoated are held at a potential that repels the ionized particles. 3 figs.

Zuhr, R.A.; Haynes, T.E.; Golanski, A.

1999-06-08T23:59:59.000Z

284

Adjoint-based method for supersonic aircraft design using equivalent area distributions  

E-Print Network [OSTI]

Adjoint-based method for supersonic aircraft design using equivalent area distributions Francisco for the design of supersonic aircraft that must match a target equivalent area distribution at constant lift of an adjoint solver for the equivalent area distribution, and the shape design process of a trijet supersonic

Alonso, Juan J.

285

100-N Area Decision Unit Target Analyte List Development for Soil  

SciTech Connect (OSTI)

This report documents the process used to identify source area target analytes in support of the 100-N Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

Ovink, R.

2012-09-18T23:59:59.000Z

286

Coastal Processes andCoastal Processes and Ocean Observations  

E-Print Network [OSTI]

conditions dispersed the oil offshore over a wide area mak of materialsbiological, chemical, and geological processing of materials arriving from both the terrestrial and offshore barrels of oil into the Gulf Sea conditionsreleasing approximately 2000 barrels of oil into the Gulf. Sea

287

Shillapoo Wildlife Area, Annual Report 2006-2007.  

SciTech Connect (OSTI)

This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 07 contract period October 1, 2006-September 30, 2007. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. The greatest success realized during this contract period was significant positive changes in the vegetative community in several wetland basins throughout the wildlife area. This major goal is being achieved in part by new equipment and operation capability funded under the BPA contract, state capital and migratory bird stamp funds, and the past or ongoing investment of other partners including Ducks Unlimited, The Natural Resources Conservation Service (NRCS), Clark Public Utilities and others. We continue to be challenged by requirements under the archaeological and historic preservation act necessary to protect many sensitive sites known to occur within the wildlife area. The problems encountered to date have been largely administrative in nature and those experienced this year were unforeseen and probably unavoidable. Early in the contract period, WDFW and BPA had agreed to have a BPA staff archaeologist perform the survey and reporting work. Unexpectedly, just prior to the expected start date for the surveys, the employee resigned leaving BPA's staff short handed and necessitated contracting the work with an archaeological consultant. This delay caused us to forego work on several projects that are now deferred until the next contract period. The most notable projects impacted by this unfortunate circumstance are those involving the construction or repair of fences.

Calkins, Brian

2006-10-01T23:59:59.000Z

288

Manhattan Project: Tech Area Gallery  

Office of Scientific and Technical Information (OSTI)

TECH AREA GALLERY (LARGE) TECH AREA GALLERY (LARGE) Los Alamos: The Laboratory Resources > Photo Gallery All of the photographs below are of the "Tech Area" at Los Alamos during or shortly after the wartime years. If this page is taking a long time to load, click here for a photo gallery with smaller versions of the same images. There is a map of the Tech Area at the top and again at the bottom. The first image below is courtesy the Los Alamos National Laboratory. All of the other photographs are reproduced from Edith C. Truslow, with Kasha V. Thayer, ed., Manhattan Engineer District: Nonscientific Aspects of Los Alamos Project Y, 1942 through 1946 (Los Alamos, NM: Manhattan Engineer District, ca. 1946; first printed by Los Alamos Scientific Laboratory as LA-5200, March 1973; reprinted in 1997 by the Los Alamos Historical Society). This is a reprint of an unpublished volume originally written in 1946 by 2nd Lieutenant Edith C. Truslow, a member of the Women's Army Corps, as a contribution to the Manhattan Engineer District History.

289

TASRateProcess  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated System Rate Adjustment Process Integrated System Rate Adjustment Process Federal Register Notice, December 29, 2009 (190kb pdf) Proposed 2010 IS Rate (292kb pdf) Rate Brochure June 2009 (5.74mb pdf) Notice of Proposed Transmission and Ancillary Services Rates Federal Register Notice (122kb pdf) Advance Notice of Rate Adjustment Meeting Presentation, June 10, 2008 Printable Version (97.2kb pdf) Public Information Forum Presentation, June 24, 2009 Printable Version (1.97mb pdf) Sample Energy Imbalance Calculations (271kb pdf) Sample Revenue Requirement Templates Basin Electric Power Cooperative Template (2008 sample data) (108kb pdf) Heartland Consumers Power District Template (2008 sample data) (120kb pdf) Western Area Power Administration Template (2008 sample data) (150kb pdf) Responses to Questions on Projected Rate Estimates

290

Periodic gravitational waves from small cosmic string loops  

Science Journals Connector (OSTI)

We consider a population of small, high-velocity cosmic string loops. We assume the typical length of these loops is determined by the gravitational radiation scale and use the results of Polchinski and Rocha which pointed out their highly relativistic nature. A study of the gravitational wave emission from such a population is carried out. The large Lorentz boost involved causes the lowest harmonics of the loops to fall within the frequency band of the Laser Interferometer Gravitational Wave Observatory detector. Because of this feature the gravitational waves emitted by such loops can be detected in a periodic search rather than in burst or stochastic analysis. It is shown that, for interesting values of the string tension (10-10?G??10-8), the detector can observe loops at reasonably high redshifts and that detection is, in principle, possible. We compute the number of expected observations produced by such a process. For a 10 h search we find that this number is of order O(10-4). This is a consequence of the low effective number density of the loops traveling along the line of sight. However, small probabilities of reconnection and longer observation times can improve the result.

Florian Dubath and Jorge V. Rocha

2007-07-02T23:59:59.000Z

291

A renewal theory approach to periodic copolymers with adsorption  

E-Print Network [OSTI]

We consider a general model of a heterogeneous polymer chain fluctuating in the proximity of an interface between two selective solvents. The heterogeneous character of the model comes from the fact that the monomer units interact with the solvents and with the interface according to some charges that they carry. The charges repeat themselves along the chain in a periodic fashion. The main question concerning this model is whether the polymer remains tightly close to the interface, a phenomenon called localization, or whether there is a marked preference for one of the two solvents, thus yielding a delocalization phenomenon. In this paper, we present an approach that yields sharp estimates for the partition function of the model in all regimes (localized, delocalized and critical). This, in turn, makes possible a precise pathwise description of the polymer measure, obtaining the full scaling limits of the model. A key point is the closeness of the polymer measure to suitable Markov renewal processes, Markov renewal theory being one of the central mathematical tools of our analysis.

Francesco Caravenna; Giambattista Giacomin; Lorenzo Zambotti

2007-10-24T23:59:59.000Z

292

Process Deviation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Exercise Course Implementation 10_0630 Page 1 of 8 1 Exercise Course Implementation 10_0630 Page 1 of 8 EOTA - Business Process Document Title: Exercise Course Implementation Document Number: ISDP-011 Rev. 10_0630 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: ISD, ITT, MGT Referenced Document(s): ISDF-004 Design Document, ISDF-006 WBT Script Template, ISDF-007 Lesson Plan Template, ISDP-012, ILT Course Implementation, ISDF-008 ILT Student Feedback Survey, ISDF-010 After Action Report ISDP-011 Exercise Course Implementation 10_0630 Page 2 of 8 Revision History: Rev. Description of Change 10_0630 Initial Release ISDP-011 Exercise Course Implementation 10_0630 Page 3 of 8

293

Fermentation process  

SciTech Connect (OSTI)

Fermentation process consists essentially of fermenting a 10-45% w/w aqueous slurry of granular starch for the production of ethanol with an ethanol-producing microorganism in the presence of alpha-amylase and glucoamylase, the conduct of said fermentation being characterized by low levels of dextrin and fermentable sugars in solution in the fermentation broth throughout the fermentation, and thereafter recovering enzymes from the fermentation broth for use anew in fermentation of granular starch.

Lutzen, N.W.

1982-02-23T23:59:59.000Z

294

Electrolytic Processes  

Broader source: Energy.gov [DOE]

Electrolysis is the process of using electricity to split water into hydrogen and oxygen. This reaction takes place in a unit called an electrolyzer. Electrolyzers can be small, appliance-size equipment and well-suited for small-scale distributed hydrogen production. Research is also under way to examine larger-scale electrolysis that could be tied directly to renewable or other non-greenhouse gas emitting electricity production. Hydrogen production at a wind farm generating electricity is an example of this.

295

Limited-Area Fourier Spectral Models and Data Analysis Schemes: Windows, Fourier Extension, Davies Relaxation, and All That  

Science Journals Connector (OSTI)

Regional spectral models have previously periodized and blended limited-area data through ad hoc low-order schemes justified by intuition and empiricism. By using infinitely differentiable “window functions” or “bells” borrowed from wavelet ...

John P. Boyd

2005-07-01T23:59:59.000Z

296

Scenario Prediction of Energy Demand and Development Status of Renewable Energy in Dunstan Area of Chongming Island  

Science Journals Connector (OSTI)

Based on the data of GDP and population during the period 2003–2008, the energy demand in 2020 for industrial and residential energy in Dunstan area of Chongming Island was ... research material, the development ...

Xuezhong Fan; Liquan Zhang

2013-01-01T23:59:59.000Z

297

Blackfoot Reservoir Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Blackfoot Reservoir Geothermal Area Blackfoot Reservoir Geothermal Area (Redirected from Blackfoot Reservoir Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Blackfoot Reservoir Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: Idaho Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0

298

Wister Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Wister Geothermal Area Wister Geothermal Area (Redirected from Wister Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Wister Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

299

Teels Marsh Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Teels Marsh Geothermal Area Teels Marsh Geothermal Area (Redirected from Teels Marsh Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Teels Marsh Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0

300

Truckhaven Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Truckhaven Geothermal Area Truckhaven Geothermal Area (Redirected from Truckhaven Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Truckhaven Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Mokapu Penninsula Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Mokapu Penninsula Geothermal Area Mokapu Penninsula Geothermal Area (Redirected from Mokapu Penninsula Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Mokapu Penninsula Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

302

Kilauea Summit Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kilauea Summit Geothermal Area Kilauea Summit Geothermal Area (Redirected from Kilauea Summit Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kilauea Summit Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (12) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

303

Flint Geothermal Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Flint Geothermal Geothermal Area Flint Geothermal Geothermal Area (Redirected from Flint Geothermal Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Flint Geothermal Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: Colorado Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

304

Monolith electroplating process  

DOE Patents [OSTI]

An electroplating process for preparing a monolith metal layer over a polycrystalline base metal and the plated monolith product. A monolith layer has a variable thickness of one crystal. The process is typically carried in molten salts electrolytes, such as the halide salts under an inert atmosphere at an elevated temperature, and over deposition time periods and film thickness sufficient to sinter and recrystallize completely the nucleating metal particles into one single crystal or crystals having very large grains. In the process, a close-packed film of submicron particle (20) is formed on a suitable substrate at an elevated temperature. The temperature has the significance of annealing particles as they are formed, and substrates on which the particles can populate are desirable. As the packed bed thickens, the submicron particles develop necks (21) and as they merge into each other shrinkage (22) occurs. Then as micropores also close (23) by surface tension, metal density is reached and the film consists of unstable metal grain (24) that at high enough temperature recrystallize (25) and recrystallized grains grow into an annealed single crystal over the electroplating time span. While cadmium was used in the experimental work, other soft metals may be used.

Agarrwal, Rajev R. (1410 S. Busse Rd., 2K, Mt. Prospect, IL 60056)

2001-01-01T23:59:59.000Z

305

Drilling, Sampling, and Well-Installation Plan for the IFC Well Field, 300 Area  

SciTech Connect (OSTI)

The 300 Area was selected as a location for an IFC because it offers excellent opportunities for field research on the influence of mass-transfer processes on uranium in the vadose zone and groundwater. The 300 Area was the location of nuclear fuel fabrication facilities and has more than 100 waste sites. Two of these waste sites, the North and South Process Ponds received large volumes of process waste from 1943 to 1975 and are thought to represent a significant source of the groundwater uranium plume in the 300 Area. Geophysical surveys and other characterization efforts have led to selection of the South Process Pond for the IFC.

Bjornstad, Bruce N.; Horner, Jacob A.

2008-05-05T23:59:59.000Z

306

RHIC | New Areas of Physics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A New Area of Physics A New Area of Physics RHIC has created a new state of hot, dense matter out of the quarks and gluons that are the basic particles of atomic nuclei, but it is a state quite different and even more remarkable than had been predicted. Instead of behaving like a gas of free quarks and gluons, as was expected, the matter created in RHIC's heavy ion collisions is more like a liquid. Quarks Gluons and quarks Ions Ions about to collide Impact Just after collision Perfect Liquid The "perfect" liquid hot matter Hot Nuclear Matter A review article in the journal Science describes groundbreaking discoveries that have emerged from RHIC, synergies with the heavy-ion program at the Large Hadron Collider, and the compelling questions that will drive this research forward on both sides of the Atlantic.

307

CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

r r r r r t r r t r r r * r r r r r r CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA ,FACILITY RECORDS 1970 UNITED STATES ATOMIC ENERGY COMMlSSION NEVADA OPERATIONS OFFICE LAS VEGAS, NEVADA September 1970 Prepared By Holmes & Narver. Inc. On-Continent Test Division P.O. Box 14340 Las Vegas, Nevada 338592 ...._- _._--_ .. -- - - - - - - .. .. - .. - - .. - - - CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA FACILITY RECORDS 1970 This page intentionally left blank - - .. - - - PURPOSE This facility study has been prepared in response to a request of the AEC/NVOO Property Management Division and confirmed by letter, W. D. Smith to L. E. Rickey, dated April 14, 1970, STS Program Administrative Matters. The purpose is to identify each facility, including a brief description, the acquisition cost either purchase and/or construction, and the AE costs if identi- fiable. A narrative review of the history of the subcontracts

308

Variable area light reflecting assembly  

DOE Patents [OSTI]

Device is described for tracking daylight and projecting it into a building. The device tracks the sun and automatically adjusts both the orientation and area of the reflecting surface. The device may be mounted in either a wall or roof of a building. Additionally, multiple devices may be employed in a light shaft in a building, providing daylight to several different floors. The preferred embodiment employs a thin reflective film as the reflecting device. One edge of the reflective film is fixed, and the opposite end is attached to a spring-loaded take-up roller. As the sun moves across the sky, the take-up roller automatically adjusts the angle and surface area of the film. Additionally, louvers may be mounted at the light entrance to the device to reflect incoming daylight in an angle perpendicular to the device to provide maximum reflective capability when daylight enters the device at non-perpendicular angles. 9 figs.

Howard, T.C.

1986-12-23T23:59:59.000Z

309

Carlsbad Area Office Executive Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 1998 June 1998 Carlsbad Area Office Executive Summary The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other activities associated with the National TRU Program (NTP). The CAO develops and directs implementation of the TRU waste program, and assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all TRU waste sites. A cornerstone of the Department of Energy's (DOE) national cleanup strategy, WIPP is

310

Decision making process and factors routing  

E-Print Network [OSTI]

This research studies the decision-making process and the factors that affect truck routing. The data collection involved intercept interviews with truck drivers at three rest area and truck stops along major highways in ...

Sun, Yichen, S.M. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

311

Dynamic Process Management for Pipelined Applications  

Science Journals Connector (OSTI)

Many applications, particularly in the area of Signal and Image Processing (SIP) make use of what is referred to as a pipeline architecture. In these pipelined architectures, data are collected from some source and fed into a system for computation. ...

David Cronk; Graham Fagg; Susan Emeny; Scot Tucker

2005-06-01T23:59:59.000Z

312

Processing of Audio-Visual Collections  

E-Print Network [OSTI]

DECEMBER 2012 Processing of AUDIO-VISUAL COLLECTIONS A sof June, 15 of the audio and video collections San FranciscoBay Area. The audio recordings provide broadcasts and talk

Diaz, Angel

2012-01-01T23:59:59.000Z

313

Tanks Focus Area Site Needs Assessment FY 2000  

SciTech Connect (OSTI)

This document summarizes the Tanks Focus Area (TFA's) process of collecting, analyzing, and responding to high-level radioactive tank waste science and technology needs developed from across the DOE complex in FY 2000. The document also summarizes each science and technology need, and provides an initial prioritization of TFA's projected work scope for FY 2001 and FY 2002.

Allen, Robert W.

2000-03-10T23:59:59.000Z

314

EIS-0463: Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period Extension of Scoping Period EIS-0463: Extension of Scoping Period Presidential Permit Application for Northern Pass Transmission, New Hampshire The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional alternative route information being provided by Northern Pass, DOE is reopening the scoping period. DOE will determine the close of the scoping period once the additional routing information is received from Northern Pass, and DOE will provide at least 45 days for public review and scoping comments on any such routing information. EIS-0463-ScopingExtension-2011.pdf More Documents & Publications Application for presidential permit OE Docket No. PP-371 Northern Pass

315

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Reopening of Scoping Period for the Environmental Impact Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0448: Notice of Adoption of an Environmental Impact Statement

316

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

463: Reopening of Scoping Period for the Environmental Impact 463: Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and

317

Can Bohmian trajectories account for quantum recurrences having classical periodicities?  

E-Print Network [OSTI]

Quantum systems in specific regimes display recurrences at the period of the periodic orbits of the corresponding classical system. We investigate the excited hydrogen atom in a magnetic field -- a prototypical system of 'quantum chaos' -- from the point of view of the de Broglie Bohm (BB) interpretation of quantum mechanics. The trajectories predicted by BB theory are computed and contrasted with the time evolution of the wavefunction, which shows pronounced features at times matching the period of closed orbits of the classical hydrogen in a magnetic field problem. Individual BB trajectories do not possess these periodicities and cannot account for the quantum recurrences. These recurrences can however be explained by BB theory by considering the ensemble of trajectories compatible with an initial statistical distribution, although none of the trajectories of the ensemble are periodic, rendering unclear the dynamical origin of the classical periodicities.

A. Matzkin

2006-07-14T23:59:59.000Z

318

Innovation investment area: Technology summary  

SciTech Connect (OSTI)

The mission of Environmental Management`s (EM) Office of Technology Development (OTD) Innovation Investment Area is to identify and provide development support for two types of technologies that are developed to characterize, treat and dispose of DOE waste, and to remediate contaminated sites. They are: technologies that show promise to address specific EM needs, but require proof-of-principle experimentation; and (2) already proven technologies in other fields that require critical path experimentation to demonstrate feasibility for adaptation to specific EM needs. The underlying strategy is to ensure that private industry, other Federal Agencies, universities, and DOE National Laboratories are major participants in developing and deploying new and emerging technologies. To this end, about 125 different new and emerging technologies are being developed through Innovation Investment Area`s (IIA) two program elements: RDDT&E New Initiatives (RD01) and Interagency Agreements (RD02). Both of these activities are intended to foster research and development partnerships so as to introduce innovative technologies into other OTD program elements for expedited evaluation.

Not Available

1994-03-01T23:59:59.000Z

319

Plasma and Ion Sources in Large Area Coatings: A Review  

SciTech Connect (OSTI)

Efficient deposition of high-quality coatings often requires controlled application of excited or ionized particles. These particles are either condensing (film-forming) or assisting by providing energy and momentum to the film growth process, resulting in densification, sputtering/etching, modification of stress, roughness, texture, etc. In this review, the technical means are surveyed enabling large area application of ions and plasmas, with ion energies ranging from a few eV to a few keV. Both semiconductortype large area (single wafer or batch processing with {approx} 1000 cm{sup 2}) and in-line web and glass-coating-type large area (> 10{sup 7} m{sup 2} annually) are considered. Characteristics and differences between plasma and ion sources are explained. The latter include gridded and gridless sources. Many examples are given, including sources based on DC, RF, and microwave discharges, some with special geometries like hollow cathodes and E x B configurations.

Anders, Andre

2005-02-28T23:59:59.000Z

320

SRS - Area Completion Projects - ARF/IRF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4/16/2012 4/16/2012 SEARCH GO spacer Administrative Record File/Information Repository File Federal Facility Agreement and Supporting Documentation General Information and Technologies Public Involvement Home SRS Home Area Completion Projects Administrative Record File/Information Repository File (ARF/IRF) Index of documents contained in the ARF/IRF is available at the University of South Carolina Libraries - Aiken and Columbia on microfilm and/or CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer. Disclaimer - The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Debbie Rice at 803-725-3885.

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Plant Networks for Processing Recyclable Materials  

Science Journals Connector (OSTI)

We use a modified optimal market area model to examine how links between material recycling and other aspects of operations strategy can shape plant networks for the processing of recyclable materials. We characterize the complementarity of the recyclate ... Keywords: localization, material versatility, minimills, operations strategy, optimal market area, plant networks, recycling

Lieven Demeester; Mei Qi; Luk N. Van Wassenhove

2013-10-01T23:59:59.000Z

322

Tracking multiple generation and suppression of secondary electrons on periodic triangular surface  

SciTech Connect (OSTI)

To research the dynamic course of multipactor suppression on the periodically patterned surface, tens of electron collision processes are tracked by numerical calculation. The influences of microwave frequency, amplitude of RF electric field, slope angle, the local field enhancement, and the tilted incident electric field on the multipactor suppression are studied by tracking multi-generation electrons' trajectories, hopping and flight time, collision energy, and secondary emission yield. Meanwhile, the dynamic processes of secondary electrons on the periodic surface are analyzed by particle-in-cell (PIC) simulation. The PIC results are consistent with the analytical results in which the electrons fly reciprocatingly between the slopes and impact on the slopes; the methods of increasing the slope angle, enlarging the RF field, and lowering the frequency in a certain range are helpful to enhance the multipactor suppression steadily and persistently.

Li, S.; Wang, J. G.; Zhu, M.; Peng, J. C.; Xie, J. L.; Wu, X. L.; Guo, L. T. [Laboratory on Science and Technology of High Power Microwave, Northwest Institute of Nuclear Technology, Xi'an, Shaanxi 710024 (China)] [Laboratory on Science and Technology of High Power Microwave, Northwest Institute of Nuclear Technology, Xi'an, Shaanxi 710024 (China); Chang, C.; Xiong, Z. F. [Laboratory on Science and Technology of High Power Microwave, Northwest Institute of Nuclear Technology, Xi'an, Shaanxi 710024 (China) [Laboratory on Science and Technology of High Power Microwave, Northwest Institute of Nuclear Technology, Xi'an, Shaanxi 710024 (China); Department of Engineering Physics, Tsinghua University, Beijing 10084 (China)

2013-12-15T23:59:59.000Z

323

EIS-0489: Notice of Comment Period Extension and Additional Scoping...  

Broader source: Energy.gov (indexed) [DOE]

Meetings EIS-0489: Notice of Comment Period Extension and Additional Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

324

Guidance on the Required Period for Grantees to Obligate Funds...  

Broader source: Energy.gov (indexed) [DOE]

on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program...

325

DURING THIS REPORTING PERIOD, WE ISSUED 45 REPORTS; IDENTIFIED...  

Energy Savers [EERE]

components that have a limited lifetime due to their use of tritium, a radioactive gas which decays over time. Periodic replacement of these components is necessary to...

326

EIS-0369: Notice of Public Comment Period Extension and Additional...  

Broader source: Energy.gov (indexed) [DOE]

Notice of Public Comment Period Extension and Additional Public Meeting Supplemental Yucca Mountain Rail Corridor and Rail Alignment The Department of Energy is now announcing...

327

Green's function analysis of periodic structures in computational electromagnetics  

E-Print Network [OSTI]

the two-dimensional periodic Green's function," IEEE Trans.evaluation of the Green's function for the Helmholtzrepresentations of certain Green's functions," J. Comp.

Van Orden, Derek

2011-01-01T23:59:59.000Z

328

Periodic Boundary Conditions in the ALEGRA Finite Element Code  

SciTech Connect (OSTI)

This document describes the implementation of periodic boundary conditions in the ALEGRA finite element code. ALEGRA is an arbitrary Lagrangian-Eulerian multi-physics code with both explicit and implicit numerical algorithms. The periodic boundary implementation requires a consistent set of boundary input sets which are used to describe virtual periodic regions. The implementation is noninvasive to the majority of the ALEGRA coding and is based on the distributed memory parallel framework in ALEGRA. The technique involves extending the ghost element concept for interprocessor boundary communications in ALEGRA to additionally support on- and off-processor periodic boundary communications. The user interface, algorithmic details and sample computations are given.

AIDUN,JOHN B.; ROBINSON,ALLEN C.; WEATHERBY,JOE R.

1999-11-01T23:59:59.000Z

329

White Mountains Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

White Mountains Geothermal Area White Mountains Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: White Mountains Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: New Hampshire Exploration Region: Other GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

330

Truckhaven Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Truckhaven Geothermal Area Truckhaven Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Truckhaven Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

331

Honokowai Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Honokowai Geothermal Area Honokowai Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Honokowai Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

332

Blackfoot Reservoir Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Blackfoot Reservoir Geothermal Area Blackfoot Reservoir Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Blackfoot Reservoir Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: Idaho Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

333

Wister Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Wister Geothermal Area Wister Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Wister Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

334

Recommendation 199: Recommendation to Remove Uncontaminated Areas...  

Office of Environmental Management (EM)

9: Recommendation to Remove Uncontaminated Areas of the Oak Ridge Reservation from the National Priorities List Recommendation 199: Recommendation to Remove Uncontaminated Areas of...

335

Ahuachapan Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Activities (0) 10 References Area Overview Geothermal Area Profile Location: El Salvador Exploration Region: Central American Volcanic Arc Chain GEA Development Phase: Phase...

336

Berlín Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Activities (0) 10 References Area Overview Geothermal Area Profile Location: El Salvador Exploration Region: Central American Volcanic Arc Chain GEA Development Phase: Phase...

337

Western Area Power Administration Borrowing Authority, Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act Microsoft Word - PSRP May 15 2009 WAPA...

338

Aurora Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Aurora Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4...

339

Clean Energy Research Areas | Clean Energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tools & Resources Newsletters and Media News and Awards Supporting Organizations Clean Energy Home | Science & Discovery | Clean Energy | Research Areas SHARE Research Areas...

340

Aquifer Protection Area Land Use Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe allowable activities within aquifer protection areas, the procedure by which such areas are delineated, and relevant permit requirements. The regulations also describe...

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Imperial Valley Geothermal Area | Department of Energy  

Energy Savers [EERE]

Imperial Valley Geothermal Area Imperial Valley Geothermal Area The Imperial Valley Geothermal project consists of 10 generating plants in the Salton Sea Known Geothermal Resource...

342

Chicago Area Alternative Fuels Deployment Project (CAAFDP) |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Meeting arravt061tibingham2012o.pdf More Documents & Publications Chicago Area Alternative Fuels Deployment Project (CAAFDP) Chicago Area Alternative Fuels Deployment Project...

343

Los Humeros Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

(0) 10 References Area Overview Geothermal Area Profile Location: Chignautla, Puebla, Mexico Exploration Region: Transmexican Volcanic Belt GEA Development Phase: Phase IV -...

344

Lualualei Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Lualualei Valley Geothermal Area (Redirected from Lualualei Valley Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Lualualei Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content

345

AREA USA LLC | Open Energy Information  

Open Energy Info (EERE)

AREA USA LLC Jump to: navigation, search Name: AREA USA LLC Place: Washington, DC Zip: 20004 Sector: Services Product: Washington, D.C.-based division of Fabiani & Company...

346

Fukushima Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Activities (0) 10 References Area Overview Geothermal Area Profile Location: Fukushima, Japan Exploration Region: Northeast Honshu Arc GEA Development Phase: Coordinates:...

347

Core Analysis At Coso Geothermal Area (1980) | Open Energy Information  

Open Energy Info (EERE)

Core Analysis At Coso Geothermal Area (1980) Core Analysis At Coso Geothermal Area (1980) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Core Analysis Activity Date 1980 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine the heat transfer mechanism Notes In an investigation of the thermal regime of this Basin and Range geothermal area, temperature measurements were made in 25 shallow and 1 intermediate depth borehole. Thermal conductivity measurements were made on 312 samples from cores and drill cuttings. The actual process by which heat is transferred is rather complex; however, the heat flow determinations can be divided into two groups. The first group, less than 4.0 HFU, are indicative of regions with primarily conductive regimes, although

348

DC Resistivity Survey (Schlumberger Array) At Coso Geothermal Area (1977) |  

Open Energy Info (EERE)

DC Resistivity Survey (Schlumberger Array) At Coso DC Resistivity Survey (Schlumberger Array) At Coso Geothermal Area (1977) Exploration Activity Details Location Coso Geothermal Area Exploration Technique DC Resistivity Survey (Schlumberger Array) Activity Date 1977 Usefulness not indicated DOE-funding Unknown Exploration Basis To investigate electrical properties of rocks associated with thermal phenomena of the Devil's Kitchen-Coso Hot Springs area Notes 18 USGS Schlumberger soundings and 6 Schlumberger soundings by Furgerson (1973) were plotted and automatically processed and interpreted References Jackson, D.B. ODonnell, J.E.; Gregory, D. I. (1 January 1977) Schlumberger soundings, audio-magnetotelluric soundings and telluric mapping in and around the Coso Range, California Retrieved from "http://en.openei.org/w/index.php?title=DC_Resistivity_Survey_(Schlumberger_Array)_At_Coso_Geothermal_Area_(1977)&oldid=591389

349

Biomolecular committor probability calculation enabled by processing in network storage  

E-Print Network [OSTI]

-processing frameworks such as SETI@home [2] and Folding@home [3] have been successfully mapped to wide-area resources

Izaguirre, Jesús A.

350

U.S. Total Imports Natural Gas Plant Processing  

U.S. Energy Information Administration (EIA) Indexed Site

Plant Processing Area: U.S. Alabama Alabama Onshore-Alabama Alabama Offshore-Alabama Alaska Arkansas Arkansas-Arkansas California California Onshore-California California...

351

FERMI LARGE AREA TELESCOPE OBSERVATIONS OF GRB 110625A  

SciTech Connect (OSTI)

Gamma-ray bursts (GRBs) that emit photons at GeV energies form a small but significant population of GRBs. However, the number of GRBs whose GeV-emitting period is simultaneously observed in X-rays remains small. We report {gamma}-ray observations of GRB 110625A using Fermi's Large Area Telescope in the energy range 100 MeV-20 GeV. Gamma-ray emission at these energies was clearly detected using data taken between 180 s and 580 s after the burst, an epoch after the prompt emission phase. The GeV light curve differs from a simple power-law decay, and probably consists of two emission periods. Simultaneous Swift X-Ray Telescope observations did not show flaring behaviors as in the case of GRB 100728A. We discuss the possibility that the GeV emission is the synchrotron self-Compton radiation of underlying ultraviolet flares.

Tam, P. H. T.; Kong, A. K. H. [Institute of Astronomy and Department of Physics, National Tsing Hua University, Hsinchu 30013, Taiwan (China); Fan Yizhong, E-mail: phtam@phys.nthu.edu.tw [Purple Mountain Observatory, Chinese Academy of Sciences, Nanjing 210008 (China)

2012-08-01T23:59:59.000Z

352

Chena Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Chena Geothermal Area Chena Geothermal Area (Redirected from Chena Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Chena Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Technical Problems and Solutions 8 Geology of the Area 9 Heat Source 10 Geofluid Geochemistry 11 NEPA-Related Analyses (1) 12 Exploration Activities (9) 13 References Map: Chena Geothermal Area Chena Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Fairbanks, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

353

Tanks focus area. Annual report  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Environmental Management is tasked with a major remediation project to treat and dispose of radioactive waste in hundreds of underground storage tanks. These tanks contain about 90,000,000 gallons of high-level and transuranic wastes. We have 68 known or assumed leaking tanks, that have allowed waste to migrate into the soil surrounding the tank. In some cases, the tank contents have reacted to form flammable gases, introducing additional safety risks. These tanks must be maintained in the safest possible condition until their eventual remediation to reduce the risk of waste migration and exposure to workers, the public, and the environment. Science and technology development for safer, more efficient, and cost-effective waste treatment methods will speed up progress toward the final remediation of these tanks. The DOE Office of Environmental Management established the Tanks Focus Area to serve as the DOE-EM`s technology development program for radioactive waste tank remediation in partnership with the Offices of Waste Management and Environmental Restoration. The Tanks Focus Area is responsible for leading, coordinating, and facilitating science and technology development to support remediation at DOE`s four major tank sites: the Hanford Site in Washington State, Idaho National Engineering and Environmental Laboratory in Idaho, Oak Ridge Reservation in Tennessee, and the Savannah River Site in South Carolina. The technical scope covers the major functions that comprise a complete tank remediation system: waste retrieval, waste pretreatment, waste immobilization, tank closure, and characterization of both the waste and tank. Safety is integrated across all the functions and is a key component of the Tanks Focus Area program.

Frey, J.

1997-12-31T23:59:59.000Z

354

History of 100-B Area  

SciTech Connect (OSTI)

The initial three production reactors and their support facilities were designated as the 100-B, 100-D, and 100-F areas. In subsequent years, six additional plutonium-producing reactors were constructed and operated at the Hanford Site. Among them was one dual-purpose reactor (100-N) designed to supply steam for the production of electricity as a by-product. Figure 1 pinpoints the location of each of the nine Hanford Site reactors along the Columbia River. This report documents a brief description of the 105-B reactor, support facilities, and significant events that are considered to be of historical interest. 21 figs.

Wahlen, R.K.

1989-10-01T23:59:59.000Z

355

Carlsbad Area Office strategic plan  

SciTech Connect (OSTI)

This edition of the Carlsbad Area Office Strategic Plan captures the U.S. Department of Energy`s new focus, and supercedes the edition issued previously in 1995. This revision reflects a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on the selected combination of scientific investigations, engineered alternatives, and waste acceptance criteria for supporting the compliance applications. An overview of operations and historical aspects of the Waste Isolation Pilot Plant near Carlsbad, New Mexico is presented.

NONE

1995-10-01T23:59:59.000Z

356

Biosphere Process Model Report  

SciTech Connect (OSTI)

To evaluate the postclosure performance of a potential monitored geologic repository at Yucca Mountain, a Total System Performance Assessment (TSPA) will be conducted. Nine Process Model Reports (PMRs), including this document, are being developed to summarize the technical basis for each of the process models supporting the TSPA model. These reports cover the following areas: (1) Integrated Site Model; (2) Unsaturated Zone Flow and Transport; (3) Near Field Environment; (4) Engineered Barrier System Degradation, Flow, and Transport; (5) Waste Package Degradation; (6) Waste Form Degradation; (7) Saturated Zone Flow and Transport; (8) Biosphere; and (9) Disruptive Events. Analysis/Model Reports (AMRs) contain the more detailed technical information used to support TSPA and the PMRs. The AMRs consists of data, analyses, models, software, and supporting documentation that will be used to defend the applicability of each process model for evaluating the postclosure performance of the potential Yucca Mountain repository system. This documentation will ensure the traceability of information from its source through its ultimate use in the TSPA-Site Recommendation (SR) and in the National Environmental Policy Act (NEPA) analysis processes. The objective of the Biosphere PMR is to summarize (1) the development of the biosphere model, and (2) the Biosphere Dose Conversion Factors (BDCFs) developed for use in TSPA. The Biosphere PMR does not present or summarize estimates of potential radiation doses to human receptors. Dose calculations are performed as part of TSPA and will be presented in the TSPA documentation. The biosphere model is a component of the process to evaluate postclosure repository performance and regulatory compliance for a potential monitored geologic repository at Yucca Mountain, Nevada. The biosphere model describes those exposure pathways in the biosphere by which radionuclides released from a potential repository could reach a human receptor. Collectively, the potential human receptor and exposure pathways form the biosphere model. More detailed technical information and data about potential human receptor groups and the characteristics of exposure pathways have been developed in a series of AMRs and Calculation Reports.

J. Schmitt

2000-05-25T23:59:59.000Z

357

This fact sheet provides a brief description of the process used to clean up hom  

Office of Legacy Management (LM)

a brief description of the process used to clean up homes and businesses in Monticello that are a brief description of the process used to clean up homes and businesses in Monticello that are contaminated with uranium mill tailings. These homes and businesses are called "vicinity properties." The cleanup is part of the Monticello, Utah, Superfund projects being performed by the U.S. Department of Energy (DOE) Grand Junction Office in conjunction with the U.S. Environmental Protection Agency (EPA) and the State of Utah. Background The Monticello Vicinity Properties Project (MVPP) involves removing uranium mill tailings from more than 400 residential and business properties in the Monticello area. Tailings and Radon Tailings are the sand-like material that remains after uranium has been extracted from the ore. Throughout the operating period of the Monticello mill, mill tailings

358

Dual periodicities in the rotational modulation of Saturn narrowband emissions  

E-Print Network [OSTI]

Dual periodicities in the rotational modulation of Saturn narrowband emissions S.Y. Ye,1 D. A emissions is examined, restricting the spacecraft location to either the northern or the southern hemisphere of Saturn. It is found that in both hemispheres, the modulation period of 5 kHz narrowband emissions has two

Gurnett, Donald A.

359

Quantum coherent switch utilizing commensurate nanoelectrode and charge density periodicities  

DOE Patents [OSTI]

A quantum coherent switch having a substrate formed from a density wave (DW) material capable of having a periodic electron density modulation or spin density modulation, a dielectric layer formed onto a surface of the substrate that is orthogonal to an intrinsic wave vector of the DW material; and structure for applying an external spatially periodic electrostatic potential over the dielectric layer.

Harrison, Neil (Santa Fe, NM); Singleton, John (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

2008-08-05T23:59:59.000Z

360

Another look at periodic wavelets Brody Dylan Johnson  

E-Print Network [OSTI]

Another look at periodic wavelets Brody Dylan Johnson St. Louis University 16 May 2009 Brody Dylan Johnson (St. Louis University) Another look at periodic wavelets 16 May 2009 1 / 31 #12;Overview Overview. (see, e.g., the texts of Meyer and Daubechies) Brody Dylan Johnson (St. Louis University) Another look

Johnson, Brody Dylan

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Photonic bandgaps of periodic multilayers with diffuse interfaces  

E-Print Network [OSTI]

of the locations and widths of the forbidden bandgaps is standard [1­3]. However, generally the interfaces betweenPhotonic bandgaps of periodic multilayers with diffuse interfaces Jean-Michel André* , Philippe-michel.andre1@upmc.fr The photonic bandgap of periodic multilayers with diffuse interface is calculated

Boyer, Edmond

362

BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS  

Science Journals Connector (OSTI)

......Articles BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS M. F...University BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS By M...Equivariant JT-theory and completion' (to appear). 9. M. F...and I. M. Singer, 'The index of elliptio operators I......

M. F. ATIYAH

1968-01-01T23:59:59.000Z

363

Insecticides and my Osmia cornifrons Nesting Container Nesting Period  

E-Print Network [OSTI]

Insecticides and my Osmia cornifrons Nesting Container Nesting Period The Osmia cornifrons nesting male offspring. The end caps of nesting tubes made by older females are thin and weak, and they tend to break easily. In addition, near the end of the nesting period the numbers of parasites and predators

364

Global Leaf Area Index Data from Field Measurements, 1932-2000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Published estimates of leaf area index (LAI), covering the period Published estimates of leaf area index (LAI), covering the period 1932-2000, have been compiled at the ORNL DAAC into a single data set to support model development and EOS MODIS product validation. Like net primary productivity (NPP), leaf area index (LAI) is a key parameter for global and regional models of biosphere/atmosphere exchange of carbon dioxide, water vapor, etc. This data set provides a benchmark of typical values and ranges of LAI for a variety of biomes and land cover types, in support of model development and validation of satellite-derived remote-sensing estimates of LAI and other vegetation parameters. For example, maximum values for point measurements are unlikely to be approached or exceeded for area-weighted LAI, which is what satellites and

365

Manhattan Project: Tech Area Gallery  

Office of Scientific and Technical Information (OSTI)

SMALL) SMALL) Los Alamos: The Laboratory Resources > Photo Gallery All of the photographs below are of the "Tech Area" at Los Alamos during or shortly after the wartime years. If you have a fast internet connection, you may wish to click here for a photo gallery with larger versions of the same images. There is a map of the Tech Area at the top and again at the bottom. The first image below is courtesy the Los Alamos National Laboratory. All of the other photographs are reproduced from Edith C. Truslow, with Kasha V. Thayer, ed., Manhattan Engineer District: Nonscientific Aspects of Los Alamos Project Y, 1942 through 1946 (Los Alamos, NM: Manhattan Engineer District, ca. 1946; first printed by Los Alamos Scientific Laboratory as LA-5200, March 1973; reprinted in 1997 by the Los Alamos Historical Society). This is a reprint of an unpublished volume originally written in 1946 by 2nd Lieutenant Edith C. Truslow, a member of the Women's Army Corps, as a contribution to the Manhattan Engineer District History.

366

EIS-0431: Extension of Public Comment Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Extension of Public Comment Period 31: Extension of Public Comment Period EIS-0431: Extension of Public Comment Period Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, CA The U.S. Department of Energy (DOE) published a notice of availability on July 22, 2013 (78 FR 43870) that provided for a comment period ending September 3, 2013. DOE is extending the public comment period to October 1, 2013, and announces public hearings for the Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary Staff Assessment/Draft Environmental Impact Statement (PSA/DEIS; DOE/EIS--0431D; 78 FR 52764). The PSA/DEIS is available on the internet at http://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement

367

EIS-0431: Extension of Public Comment Period | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Public Comment Period Public Comment Period EIS-0431: Extension of Public Comment Period Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, CA The U.S. Department of Energy (DOE) published a notice of availability on July 22, 2013 (78 FR 43870) that provided for a comment period ending September 3, 2013. DOE is extending the public comment period to October 1, 2013, and announces public hearings for the Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary Staff Assessment/Draft Environmental Impact Statement (PSA/DEIS; DOE/EIS--0431D; 78 FR 52764). The PSA/DEIS is available on the internet at http://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement or on the CEC electronic docket site at

368

Department of Energy Extends Public Comment Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period September 29, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 In response to public comments and requests, the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. The formal comment period will close on December 2, 2011, rather than October 27. Within the draft SWEIS, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office presents a formal analysis of

369

Department of Energy Extends Public Comment Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period September 29, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 In response to public comments and requests, the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. The formal comment period will close on December 2, 2011, rather than October 27. Within the draft SWEIS, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office presents a formal analysis of

370

The orbital period of the eclipsing dwarf nova CG Draconis  

E-Print Network [OSTI]

We have performed time resolved photometry on the dwarf nova CG Dra and have established for the first time that it is an eclipsing system. By measuring the times of the eclipses, we determined the orbital period as 0.18864(4) d, or 4h 31m 38 +/- 3s. This value is consistent with the shorter of two periods proposed from earlier spectroscopic studies. The orbital period places CG Dra above the period gap. The symmetrical eclipses are of short duration (FWHM 18+/-2 min, or 0.066(7) of the orbital period) and shallow (average 0.16+/-0.02 mag), suggesting a grazing eclipse which is consistent with an orbital inclination just above the critical value. Flickering persists through the eclipse which means that the flickering source is not occulted by the secondary star.

Jeremy Shears; David Boyd; Steve Brady; Roger Pickard

2008-02-04T23:59:59.000Z

371

Battery-operated air sampler for remote areas  

SciTech Connect (OSTI)

An air sampling system developed to evaluate air quality in biosphere reserves or in other remote areas is described. The equipment consists of a Dupont P-4000A pump and a specially designed battery pack containing Gates batteries. This air sampling system was tested in southern Utah and at 10 remote sampling sites in the Great Smoky Mountains National Park. The equipment was backpacked to the remote sampling sites, and was operated continuously at full capacity for a maximum 8-day period. Except for tampering by curious hikers at one site, the equipment operated satisfactorily.

Brown, K.W. (EPA Environmental Monitoring Systems Lab., Las Vegas, NV); Wiersma, G.B.; Frank, C.W.

1981-01-01T23:59:59.000Z

372

Geothermal resource evaluation of the Yuma area  

SciTech Connect (OSTI)

This report presents an evaluation of the geothermal potential of the Yuma, Arizona area. A description of the study area and the Salton Trough area is followed by a geothermal analysis of the area, a discussion of the economics of geothermal exploration and exploitation, and recommendations for further testing. It was concluded economic considerations do not favor geothermal development at this time. (ACR)

Poluianov, E.W.; Mancini, F.P.

1985-11-29T23:59:59.000Z

373

Obsidian Cliff Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Obsidian Cliff Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Obsidian Cliff Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0

374

Geochemical Characterization of Chromate Contamination in the 100 Area Vadose Zone at the Hanford Site  

SciTech Connect (OSTI)

The major objectives of the proposed study were to: 1.) determine the leaching characteristics of hexavalent chromium [Cr(VI)] from contaminated sediments collected from 100 Area spill sites; 2.) elucidate possible Cr(VI) mineral and/or chemical associations that may be responsible for Cr(VI) retention in the Hanford Site 100 Areas through the use of i.) macroscopic leaching studies and ii.) microscale characterization of contaminated sediments; and 3.) provide information to construct a conceptual model of Cr(VI) geochemistry in the Hanford 100 Area vadose zone. In addressing these objectives, additional benefits accrued were: (1) a fuller understanding of Cr(VI) entrained in the vadose zone that will that can be utilized in modeling potential Cr(VI) source terms, and (2) accelerating the Columbia River 100 Area corridor cleanup by providing valuable information to develop remedial action based on a fundamental understanding of Cr(VI) vadose zone geochemistry. A series of macroscopic column experiments were conducted with contaminated and uncontaminated sediments to study Cr(VI) desorption patterns in aged and freshly contaminated sediments, evaluate the transport characteristics of dichromate liquid retrieved from old pipelines of the 100 Area; and estimate the effect of strongly reducing liquid on the reduction and transport of Cr(VI). Column experiments used the < 2 mm fraction of the sediment samples and simulated Hanford groundwater solution. Periodic stop-flow events were applied to evaluate the change in elemental concentration during time periods of no flow and greater fluid residence time. The results were fit using a two-site, one dimensional reactive transport model. Sediments were characterized for the spatial and mineralogical associations of the contamination using an array of microscale techniques such as XRD, SEM, EDS, XPS, XMP, and XANES. The following are important conclusions and implications. Results from column experiments indicated that most of contaminant Cr travels fast through the sediments and appears as Cr(VI) in the effluents. The significance of this for groundwater concentrations would, however, depend on the mass flux of recharge to the water table. adsorption of Cr(VI) to sediments from spiked Cr(VI) solution is low; calculated retardation coefficients are close to one. Calcium polysulfide solutions readily reduced Cr(VI) to Cr(III) in column experiments. However a significant amount of the Cr(VI) was mobilized ahead of the polysulfide solution front. This has significant implications for in-situ reductive remediation techniques. The experiments suggest that it would be difficult to design a remedial measure using infiltration of liquid phase reductants without increasing transport of Cr(VI) toward the water table. The microscopic characterization results are consistent with the column studies. Cr(VI) is found as ubiquitous coatings on sediment grain surfaces. Small, higher concentration, chromium sites are associated with secondary clay mineral inclusions, with occasional barium chromate minerals, and reduced to Cr(III) in association with iron oxides that are most likely magnetite primary minerals. Within the restricted access domains of sediment matrix, ferrous iron could also diffuse from in situ, high-surface-area minerals to cause the reductive immobilization of chromate. This process may be favored at microscale geochemical zones where ferrous iron could be supplied. Once nucleated, micrometer-scale precipitates are favored as growing locales for further accumulation, causing the formation of discrete zones of Cr(III).

Dresel, P. Evan; Qafoku, Nikolla; McKinley, James P.; Fruchter, Jonathan S.; Ainsworth, Calvin C.; Liu, Chongxuan; Ilton, Eugene S.; Phillips, J. L.

2008-07-16T23:59:59.000Z

375

Southern CA Area | Open Energy Information  

Open Energy Info (EERE)

Southern CA Area Southern CA Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Southern CA Area 1.1 Products and Services in the Southern CA Area 1.2 Research and Development Institutions in the Southern CA Area 1.3 Networking Organizations in the Southern CA Area 1.4 Investors and Financial Organizations in the Southern CA Area 1.5 Policy Organizations in the Southern CA Area Clean Energy Clusters in the Southern CA Area Products and Services in the Southern CA Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

376

Pumpernickel Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Pumpernickel Valley Geothermal Area Pumpernickel Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Pumpernickel Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: Pumpernickel Valley Geothermal Area Pumpernickel Valley Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

377

Whiskey Flats Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Whiskey Flats Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Map: Whiskey Flats Geothermal Area Whiskey Flats Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

378

Pacific Northwest Area | Open Energy Information  

Open Energy Info (EERE)

Pacific Northwest Area Pacific Northwest Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Pacific Northwest Area 1.1 Products and Services in the Pacific Northwest Area 1.2 Research and Development Institutions in the Pacific Northwest Area 1.3 Networking Organizations in the Pacific Northwest Area 1.4 Investors and Financial Organizations in the Pacific Northwest Area 1.5 Policy Organizations in the Pacific Northwest Area Clean Energy Clusters in the Pacific Northwest Area Products and Services in the Pacific Northwest Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

379

Chena Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Chena Geothermal Area Chena Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Chena Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Technical Problems and Solutions 8 Geology of the Area 9 Heat Source 10 Geofluid Geochemistry 11 NEPA-Related Analyses (1) 12 Exploration Activities (9) 13 References Map: Chena Geothermal Area Chena Geothermal Area Location Map Area Overview Geothermal Area Profile Location: Fairbanks, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

380

Greater Boston Area | Open Energy Information  

Open Energy Info (EERE)

Greater Boston Area Greater Boston Area Jump to: navigation, search Contents 1 Clean Energy Clusters in the Greater Boston Area 1.1 Products and Services in the Greater Boston Area 1.2 Research and Development Institutions in the Greater Boston Area 1.3 Networking Organizations in the Greater Boston Area 1.4 Investors and Financial Organizations in the Greater Boston Area 1.5 Policy Organizations in the Greater Boston Area Clean Energy Clusters in the Greater Boston Area Products and Services in the Greater Boston Area Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Interrelationship Between Watershed Condition and Health of Riparian Areas in Southwestern United States  

E-Print Network [OSTI]

processes operating on upland slopes ofa watershed and the channel processes affecting downstream riparian to different rehabilitation treatments. Riparian areas are closely interrelated with the sur rounding watershed not only destroyed plant cover and increased soil erosion but also, in the process, reduced valuable

382

Functional Area Qualification Standard Reference Guides | Department of  

Broader source: Energy.gov (indexed) [DOE]

Services » Assistance » Federal Technical Capability Program » Services » Assistance » Federal Technical Capability Program » Functional Area Qualification Standard Reference Guides Functional Area Qualification Standard Reference Guides Aviation Manager Aviation Safety Officer Chemical Processing Civil/Structural Engineering Construction Management Criticality Safety Criticality Safety Support Group, NNSA SC Electrical Systems and Safety Oversight Emergency Management Environmental Compliance Environmental Restoration Facility Maintenance Management Facility Representative Fire Protection Engineering General Technical Base Industrial Hygiene Instrumentation and Control Mechanical Systems NNSA Package Certification Engineer Nuclear Safety Specialists Occupational Safety Quality Assurance Radiation Protection Safeguards and Security

383

NPO Qualifying Officials Primary Functional Area* Qualifying Official  

Broader source: Energy.gov (indexed) [DOE]

NPO Qualifying Officials NPO Qualifying Officials Primary Functional Area* Qualifying Official Aviation Safety Officer/ Aviation Manager Richard Caummisar Chemical Processing Jim Goss, Ken Ivey Civil/Structural Engineering Dale Christensen Conduct of Maintenance Any Qualified Facility Representative, Carlos Alvarado, Earl Burkholder, Terrv Zimmennan Construction Management and Engineering Anna Beard, Terry Zimmennan, Dale Christenson, Don Peters Construction Project/Safety Richard Caummisar, Terry Zimmerman, Susan Morris Criticality Safety Roy Hedtke, Ed Kendall Deactivation and Decommission Catherine Schidel Explosives Safety Program Scott Wood Electrical Systems Scott Doleml, Roger Kulavich, Steve Wellbaum .Emergency Management Rodney Barnes Environmental Management Areas Susan Morris. Craig Snider, Jim Donnelly

384

Large area, surface discharge pumped, vacuum ultraviolet light source  

DOE Patents [OSTI]

Large area, surface discharge pumped, vacuum ultraviolet (VUV) light source is disclosed. A contamination-free VUV light source having a 225 cm{sup 2} emission area in the 240-340 nm region of the electromagnetic spectrum with an average output power in this band of about 2 J/cm{sup 2} at a wall-plug efficiency of approximately 5% is described. Only ceramics and metal parts are employed in this surface discharge source. Because of the contamination-free, high photon energy and flux, and short pulse characteristics of the source, it is suitable for semiconductor and flat panel display material processing. 3 figs.

Sze, R.C.; Quigley, G.P.

1996-12-17T23:59:59.000Z

385

Planar resonant periodic orbits in Kuiper belt dynamics  

E-Print Network [OSTI]

In the framework of the planar restricted three body problem we study a considerable number of resonances associated to the Kuiper Belt dynamics and located between 30 and 48 a.u. Our study is based on the computation of resonant periodic orbits and their stability. Stable periodic orbits are surrounded by regular librations in phase space and in such domains the capture of trans-Neptunian object is possible. All the periodic orbits found are symmetric and there is evidence for the existence of asymmetric ones only in few cases. In the present work first, second and third order resonances are under consideration. In the planar circular case we found that most of the periodic orbits are stable. The families of periodic orbits are temporarily interrupted by collisions but they continue up to relatively large values of the Jacobi constant and highly eccentric regular motion exists for all cases. In the elliptic problem and for a particular eccentricity value of the primary bodies the periodic orbits are isolated. The corresponding families, where they belong to, bifurcate from specific periodic orbits of the circular problem and seem to continue up to the rectilinear problem. Both stable and unstable orbits are obtained for each case. In the elliptic problem the unstable orbits found are associated with narrow chaotic domains in phase space. The evolution of the orbits, which are located in such chaotic domains, seems to be practically regular and bounded for long time intervals.

George Voyatzis; Thomas Kotoulas

2005-02-28T23:59:59.000Z

386

Shale oil recovery process  

DOE Patents [OSTI]

A process of producing within a subterranean oil shale deposit a retort chamber containing permeable fragmented material wherein a series of explosive charges are emplaced in the deposit in a particular configuration comprising an initiating round which functions to produce an upward flexure of the overburden and to initiate fragmentation of the oil shale within the area of the retort chamber to be formed, the initiating round being followed in a predetermined time sequence by retreating lines of emplaced charges developing further fragmentation within the retort zone and continued lateral upward flexure of the overburden. The initiating round is characterized by a plurality of 5-spot patterns and the retreating lines of charges are positioned and fired along zigzag lines generally forming retreating rows of W's. Particular time delays in the firing of successive charges are disclosed.

Zerga, Daniel P. (Concord, CA)

1980-01-01T23:59:59.000Z

387

unit process | OpenEI  

Open Energy Info (EERE)

unit process unit process Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

388

MOISTURE AND SURFACE AREA MEASUREMENTS OF PLUTONIUM-BEARING OXIDES  

SciTech Connect (OSTI)

To ensure safe storage, plutonium-bearing oxides are stabilized at 950 C for at least two hours in an oxidizing atmosphere. Stabilization conditions are expected to decompose organic impurities, convert metals to oxides, and result in moisture content below 0.5 wt%. During stabilization, the specific surface area is reduced, which minimizes readsorption of water onto the oxide surface. Plutonium oxides stabilized according to these criteria were sampled and analyzed to determine moisture content and surface area. In addition, samples were leached in water to identify water-soluble chloride impurity content. Results of these analyses for seven samples showed that the stabilization process produced low moisture materials (< 0.2 wt %) with low surface area ({le} 1 m{sup 2}/g). For relatively pure materials, the amount of water per unit surface area corresponded to 1.5 to 3.5 molecular layers of water. For materials with chloride content > 360 ppm, the calculated amount of water per unit surface area increased with chloride content, indicating hydration of hygroscopic salts present in the impure PuO{sub 2}-containing materials. The low moisture, low surface area materials in this study did not generate detectable hydrogen during storage of four or more years.

Crowder, M.; Duffey, J.; Livingston, R.; Scogin, J.; Kessinger, G.; Almond, P.

2009-09-28T23:59:59.000Z

389

Gabbs Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Gabbs Valley Geothermal Area Gabbs Valley Geothermal Area (Redirected from Gabbs Valley Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Gabbs Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (4) 9 Exploration Activities (11) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

390

Salt Wells Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Salt Wells Geothermal Area Salt Wells Geothermal Area (Redirected from Salt Wells Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Salt Wells Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 9.1 Regional Setting 9.2 Stratigraphy 9.3 Structure 10 Hydrothermal System 11 Heat Source 12 Geofluid Geochemistry 13 NEPA-Related Analyses (9) 14 Exploration Activities (28) 15 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

391

Marysville Mt Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Marysville Mt Geothermal Area Marysville Mt Geothermal Area (Redirected from Marysville Mt Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Marysville Mt Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Montana Exploration Region: Other GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

392

Fort Bliss Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bliss Geothermal Area Fort Bliss Geothermal Area (Redirected from Fort Bliss Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bliss Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (22) 10 References Area Overview Geothermal Area Profile Location: Texas Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

393

Amedee Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Amedee Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Amedee Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Map: Amedee Geothermal Area Amedee Geothermal Area Location Map Area Overview Geothermal Area Profile Location: California Exploration Region: Walker-Lane Transition Zone GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

394

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area (Redirected from New River Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

395

Kawaihae Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kawaihae Geothermal Area Kawaihae Geothermal Area (Redirected from Kawaihae Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kawaihae Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (6) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

396

Maui Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Maui Geothermal Area Maui Geothermal Area (Redirected from Maui Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Maui Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

397

Glass Buttes Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Glass Buttes Geothermal Area Glass Buttes Geothermal Area (Redirected from Glass Buttes Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Glass Buttes Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (14) 10 References Area Overview Geothermal Area Profile Location: Oregon Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

398

Obsidian Cliff Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Obsidian Cliff Geothermal Area Obsidian Cliff Geothermal Area (Redirected from Obsidian Cliff Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Obsidian Cliff Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

399

Jemez Pueblo Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jemez Pueblo Geothermal Area Jemez Pueblo Geothermal Area (Redirected from Jemez Pueblo Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jemez Pueblo Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

400

Socorro Mountain Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Socorro Mountain Geothermal Area Socorro Mountain Geothermal Area (Redirected from Socorro Mountain Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Socorro Mountain Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (10) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Kauai Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kauai Geothermal Area Kauai Geothermal Area (Redirected from Kauai Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kauai Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (1) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

402

Dixie Meadows Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Dixie Meadows Geothermal Area Dixie Meadows Geothermal Area (Redirected from Dixie Meadows Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Dixie Meadows Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (6) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

403

Jemez Mountain Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jemez Mountain Geothermal Area Jemez Mountain Geothermal Area (Redirected from Jemez Mountain Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jemez Mountain Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed.

404

DOE Media Advisory - DOE extends public comment period on Draft  

Broader source: Energy.gov (indexed) [DOE]

Media Advisory - DOE extends public comment period on Draft Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site DOE Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site October 13, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy's Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for

405

Property:Building/EndPeriod | Open Energy Information  

Open Energy Info (EERE)

EndPeriod EndPeriod Jump to: navigation, search This is a property of type Date. End of the period (last day of the month) Pages using the property "Building/EndPeriod" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1 December 2004 + Sweden Building 05K0002 + 1 December 2004 + Sweden Building 05K0003 + 1 December 2004 + Sweden Building 05K0004 + 1 December 2004 + Sweden Building 05K0005 + 1 September 2005 + Sweden Building 05K0006 + 1 September 2005 + Sweden Building 05K0007 + 1 September 2005 + Sweden Building 05K0008 + 1 September 2005 + Sweden Building 05K0009 + 1 September 2005 + Sweden Building 05K0010 + 1 September 2005 + Sweden Building 05K0011 + 1 September 2005 + Sweden Building 05K0012 + 1 December 2004 +

406

Application Periods Open for 2014 National Clean Energy Business Plan  

Broader source: Energy.gov (indexed) [DOE]

Application Periods Open for 2014 National Clean Energy Business Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests November 14, 2013 - 5:05pm Addthis The Energy Department today announced the opening of the application periods for six regional competitions that are part of the 2014 U.S. Department of Energy National Clean Energy Business Plan Competition. The competition aims to inspires university teams and promote entrepreneurship in clean energy technologies that will boost American competitiveness, bring cutting-edge clean energy solutions to the market, and strengthen our economic prosperity. The National Clean Energy Business Plan Competition challenges university

407

Property:Building/StartPeriod | Open Energy Information  

Open Energy Info (EERE)

StartPeriod StartPeriod Jump to: navigation, search This is a property of type Date. Start of the period (first day o the month) Pages using the property "Building/StartPeriod" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1 January 2004 + Sweden Building 05K0002 + 1 January 2004 + Sweden Building 05K0003 + 1 January 2004 + Sweden Building 05K0004 + 1 January 2004 + Sweden Building 05K0005 + 1 October 2004 + Sweden Building 05K0006 + 1 October 2004 + Sweden Building 05K0007 + 1 October 2004 + Sweden Building 05K0008 + 1 October 2004 + Sweden Building 05K0009 + 1 October 2004 + Sweden Building 05K0010 + 1 October 2004 + Sweden Building 05K0011 + 1 October 2004 + Sweden Building 05K0012 + 1 January 2004 + Sweden Building 05K0013 + 1 October 2004 +

408

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers [EERE]

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

409

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Period: Fee Information Maximum Fee Contract Type: Minimum Fee 91,085,394 74,386,573 Target Fee September 2002 - March 2017 Cost Plus Fixed FeeIncentive Fee 1,192,114,896...

410

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers [EERE]

Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

411

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

412

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

2011 - September 2015 June 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975 Contract Period:...

413

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee June 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,245,814,927 Contract Period: EM Contractor Fee Site:...

414

The orbital period distribution of subdwarf B binaries  

E-Print Network [OSTI]

We present the results of a 3.5 year long campaign to measure orbital periods of subdwarf B (sdB) star binaries. We directly compare our observed orbital period distribution with that predicted by using binary population synthesis. Up to now, most of our systems seem to have been formed through two of the formation channels discussed by Han et al.(2003), i.e. the first and the second common envelope ejection (CE) channels. At this point, thanks to the long baseline of our observations, we are starting to detect also very long orbital period systems. These have probably come from a complete different formation path, the first stable Roche Lobe overflow (RLOF) channel in which the first mass transfer phase is stable. This channel is expected to lead to the formation of very wide binaries with orbital periods ranging between 0.5 to 2000 days.

L. Morales-Rueda; P. F. L. Maxted; T. R. Marsh

2003-09-03T23:59:59.000Z

415

Short-period seismic rotations and translations recorded by Rotaphone  

E-Print Network [OSTI]

-period Rotaphone records of events induced by natural and/or anthropogenic sources 31 5.1 Records of quarry blasts Rotation to translation relations 39 7 The problem of seismic translational components being contaminated

Cerveny, Vlastislav

416

Dynamic Scheduling of Skippable Periodic Tasks: Issues and Proposals  

E-Print Network [OSTI]

-Chetto and Audrey Marchand IRCCyN, University of Nantes, Nantes, FRANCE Email: {maryline.chetto, audrey.marchand Scheduling of Skippable Periodic Tasks in Weakly-Hard Real-Time Systems," by M. Silly-Chetto, and A. Marchand

Paris-Sud XI, Université de

417

Periodic solutions of Schrodinger equation in Hilbert space  

E-Print Network [OSTI]

Necessary and sufficient conditions for existence of boundary value problem of Schrodinger equation are obtained in linear and nonlinear cases. Periodic analytical solutions are represented using generalized Green's operator

A. A. Boichuk; A. A. Pokutnyi

2012-09-03T23:59:59.000Z

418

Modeling Maritime Culture: Galveston, Texas, in the Historic Period  

Science Journals Connector (OSTI)

...“Maritime cultural landscape” (MCL) can be applied as both a research framework and a theoretical inquiry into cultural interactions with the sea. The utility of MCL approaches in historic period archaeologica...

Matthew E. Keith; Amanda M. Evans

2011-01-01T23:59:59.000Z

419

Thermal equilibrium theory of periodically focused charged-particle beams  

E-Print Network [OSTI]

A thermal equilibrium theory of periodically focused charged-particle beams is presented in the framework of both warm-fluid and kinetic descriptions. In particular, the thermal beam equilibria are discussed for paraxial ...

Samokhvalova, Ksenia R

2008-01-01T23:59:59.000Z

420

Real-time Multi-period truckload routing problems  

E-Print Network [OSTI]

In this thesis we consider a multi-period truckload pick-up and delivery problem dealing with real-time requests over a finite time horizon. We introduce the notion of postponement of requests, whereby the company can ...

Limpaitoon, Tanachai

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Microsoft Word - DOE News Release - Public Comment Period Extended...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Period on Proposed Cleanup Plans Extended 60 Days On Oct. 31, 2014 the U.S. Department of Energy (DOE) released two formal Proposed Plans for the decontamination and...

422

Application Periods Open for 2014 National Clean Energy Business Plan  

Broader source: Energy.gov (indexed) [DOE]

Application Periods Open for 2014 National Clean Energy Business Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests November 14, 2013 - 5:05pm Addthis The Energy Department today announced the opening of the application periods for six regional competitions that are part of the 2014 U.S. Department of Energy National Clean Energy Business Plan Competition. The competition aims to inspires university teams and promote entrepreneurship in clean energy technologies that will boost American competitiveness, bring cutting-edge clean energy solutions to the market, and strengthen our economic prosperity. The National Clean Energy Business Plan Competition challenges university

423

Realtime controller tuning for periodic disturbance rejection with application to active noise control  

E-Print Network [OSTI]

de Callafon. Scheduling control for periodic disturbance at-de Callafon, “Scheduling Control for Periodic DisturbanceR.A. de Callafon, “Scheduling Control for Periodic Distur-

Kinney, Charles E.

2009-01-01T23:59:59.000Z

424

An Autonomous Adaptive Scheduling Agent for Period Searching  

E-Print Network [OSTI]

We describe the design and implementation of an autonomous adaptive software agent that addresses the practical problem of observing undersampled, periodic, time-varying phenomena using a network of HTN-compliant robotic telescopes. The algorithm governing the behaviour of the agent uses an optimal geometric sampling technique to cover the period range of interest, but additionally implements proactive behaviour that maximises the optimality of the dataset in the face of an uncertain and changing operating environment.

Eric S. Saunders; Tim Naylor; Alasdair Allan

2008-01-24T23:59:59.000Z

425

Shillapoo Wildlife Area, Annual Report 2004-2005.  

SciTech Connect (OSTI)

This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 05 contract period October 1, 2004-September 30, 2005. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. The greatest success realized during this contract period was completion of the water system that will provide water to wetland basins within the Vancouver Lake Unit and three independent basins on adjoining Clark County owned lands. The water system paid for by Clark Public Utilities was designed and built under the direction of Ducks Unlimited. Having a reliable water supply for these areas has allowed us for the first time to begin making significant progress toward our wetland vegetation management goals on this unit. A reduction in the density of reed canary grass has already been noted and increased levels of native plant occurrence have been observed. Our most notable setback was an increase in the infestation of purple loosestrife within a portion of the Shillapoo Lakebed including parts of the North and South Units. A great deal of effort and time was spent on addressing the problem including hand cutting and spraying individual plants.

Calkins, Brian

2004-10-01T23:59:59.000Z

426

2009 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443  

SciTech Connect (OSTI)

This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from October 2008 through December 2009. It also represents the first year of the enhanced monitoring network and begins the new 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary

None

2010-09-01T23:59:59.000Z

427

Alderwood Area Service Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration's (BPA's) proposal to build a new 115-kV transmission line and 115-12.5-kV, 25-MW substation in the Alderwood, Oregon, area is discussed in the attached Environmental Assessment. The proposed substation site has been relocated about 500 feet east of the site outlined in the Environmental Assessment, but in the same field. This is not a substantial change relevant to environmental concerns. Environmental impacts of the new site differ only in that: Two residences will be visually affected. The substation will be directly across Highway 36 from two houses and would be seen in their primary views. This impact will be mitigated by landscaping the substation to create a vegetative screen. To provide access to the new site and provide for Blachly-Lane Cooperative's distribution lines, a 60-foot-wide right-of-way about 200 feet long will be needed. The total transmission line length will be less than originally planned. However, the tapline into the substation will be about 50 feet longer. 4 figs.

United States. Bonneville Power Administration.

1982-06-01T23:59:59.000Z

428

Prominence seismology using the period ratio of transverse thread oscillations  

E-Print Network [OSTI]

The ratio of the period of the fundamental mode to that of the first overtone of kink oscillations, from here on the "period ratio", is a seismology tool that can be used to infer information about the spatial variation of density along solar magnetic flux tubes. The period ratio is 2 in longitudinally homogeneous thin tubes, but it differs from 2 due to longitudinal inhomogeneity. In this paper we investigate the period ratio in longitudinally inhomogeneous prominence threads and explore its implications for prominence seismology. We numerically solve the two-dimensional eigenvalue problem of kink oscillations in a model of a prominence thread. We take into account three nonuniform density profiles along the thread. In agreement with previous works that used simple piecewise constant density profiles, we find that the period ratio is larger than 2 in prominence threads. When the ratio of the central density to that at the footpoints is fixed, the period ratio depends strongly on the form of the density profi...

Soler, R; Ballester, J L

2015-01-01T23:59:59.000Z

429

Observations of long period earthquakes accompanying hydraulic fracturing  

SciTech Connect (OSTI)

Waveforms of most seismic events accompanying hydraulic fracturing have been reported to contain clear P and S waves and have fault plane solutions consistent with shear displacement across a fault. This observation is surprising since classical hydraulic fracturing theory predicts the creation of a tensile opening of a cavity in response to fluid pressure. Very small long period events, similar to long period earthquakes observed at volcanoes, were found to occur during four hydraulic fracturing experiments carried out at Fenton Hill, New Mexico. Since the long period earthquakes occur in the same region as the shear type events, it is concluded that the unusual character of the long period earthquake waveforms is due to a source effect and not a path effect. The occurrence of long period earthquakes during hydraulic fracturing could indicate tensile fracturing. Many waveforms of these events are identical, which implies that these events represent repeated activation of a given source. A proposed source for these long period events is the sudden opening of a channel that connects two cracks filled with fluid at different pressures. The sizes of the two cracks differ, which causes two or more peaks to appear in the spectra, each peak being associated with one physical dimension of each crack. From the frequencies at which spectral peaks occur, crack lengths are estimated to be between 3 and 20m.

Bame, D.; Fehler, M.

1986-02-01T23:59:59.000Z

430

Seawater intrusion and aquifer freshening near reclaimed coastal area of Shenzhen  

E-Print Network [OSTI]

Seawater intrusion and aquifer freshening near reclaimed coastal area of Shenzhen K.P. Chen and J this period indicate that the aquifer experienced seawater intrusion in the 1980s but underwent gradual freshening in the 1990s. It is speculated that seawater intrusion was induced by excessive groundwater

Jiao, Jiu Jimmy

431

HAB Advice and Issue Tracking Process for Draft RCRA Site-Wide...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Advice and Issue Tracking Process for Draft RCRA Site-Wide Permit Comment Period Last updated 5812 Introduction: The following document is a living document intended to be...

432

Chicago-area SIAM student chapters visit Argonne | Argonne National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chicago-area SIAM student chapters visit Argonne Chicago-area SIAM student chapters visit Argonne May 10, 2013 Tweet EmailPrint Forty undergraduate students, graduate students, and postdocs from Chicago-area SIAM chapters visited Argonne's Mathematics and Computer Science (MCS) Division on April 12 for a look into some of the exciting applied mathematics research being performed at the laboratory. The morning included ten "research vignettes" presented by MCS staff. Scalable power grid dynamics simulation (Shrirang Abhyankar) Data science for scientific computing: Learning and intelligent optimization (Prasanna Balaprakash) Parallel multigrid solvers (Jed Brown) Large-scale Gaussian process calculation without matrix factorizations (Jie Chen) Scaling computational fluid dynamics beyond a million cores (Paul

433

Western Area Power Administration Electric Power Training Center  

Broader source: Energy.gov (indexed) [DOE]

Area Power Administration Area Power Administration Electric Power Training Center Tribal Webinar Series Background: The U.S. Department of Energy's (DOE) Office of Indian Energy Policy and Programs, the U.S. DOE Tribal Energy Program, and the Western Area Power Administration are conducting a series of webinars that promote tribal energy sufficiency and foster economic development and employment on tribal lands through the use of renewable energy and energy efficiency technologies. The webinars will 1. Discuss methods for Tribes to evaluate and develop their renewable energy resources, 2. Help them build the knowledge and skills essential for sustainable energy projects, 3. Outline a process of strategic energy planning for tribes interested in improving their energy

434

Aeromagnetic Survey At Kilauea Summit Area (Zablocki, 1978) | Open Energy  

Open Energy Info (EERE)

Zablocki, 1978) Zablocki, 1978) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aeromagnetic Survey At Kilauea Summit Area (Zablocki, 1978) Exploration Activity Details Location Kilauea Summit Area Exploration Technique Aeromagnetic Survey Activity Date Usefulness could be useful with more improvements DOE-funding Unknown Notes These VLF induction methods should have wide application to studies of active volcanic regions in other parts of the world and could provide some insights into the workings of larger-scaled geothermal systems. Uses high-resolution aeromagnetics References Charles J. Zablocki (1978) Applications of the VLF Induction Method For Studying Some Volcanic Processes of Kilauea Volcano, Hawaii Retrieved from "http://en.openei.org/w/index.php?title=Aeromagnetic_Survey_At_Kilauea_Summit_Area_(Zablocki,_1978)&oldid=40223

435

Fluid Inclusion Analysis At Coso Geothermal Area (2004) | Open Energy  

Open Energy Info (EERE)

Fluid Inclusion Analysis At Coso Geothermal Area Fluid Inclusion Analysis At Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Fluid Inclusion Analysis Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis 1) To determine if analyses of fluid propene and propane species in fluid inclusions can be used to interpret fluid type, history, or process. 2) To evaluate the geology and thermal history of the East Flank, in order to better understand how the rocks will behave during hydro-fracturing. Notes 1) Analyses were performed on drill cuttings at 20ft intervals from four Coso geothermal wells. Two wells are good producers, one has cold-water entrants in the production zone, and the fourth is a non-producer. The ratios show distinct differences between producing and the non-producing

436

Micro-Earthquake At Geysers Geothermal Area (2011) | Open Energy  

Open Energy Info (EERE)

Geothermal Area (2011) Geothermal Area (2011) Exploration Activity Details Location Geysers Geothermal Area Exploration Technique Micro-Earthquake Activity Date 2011 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine seismicity before and after reservoir stimulation for EGS Notes The overall goal is to gather high resolution seismicity data before, during and after stimulation activities at the EGS projects. This will include both surface and borehole deployments (as necessary in available boreholes) to provide high quality seismic data for improved processing and interpretation methodologies. This will allow the development and testing of seismic methods for understanding the performance of the EGS systems, as well as aid in developing induced seismicity mitigation techniques that can

437

Geographic Information System At Brady Hot Springs Area (Laney, 2005) |  

Open Energy Info (EERE)

Geographic Information System At Brady Hot Springs Geographic Information System At Brady Hot Springs Area (Laney, 2005) Exploration Activity Details Location Brady Hot Springs Area Exploration Technique Geographic Information System Activity Date Usefulness not indicated DOE-funding Unknown Notes InSAR Ground Displacement Analysis, Gary Oppliger and Mark Coolbaugh. This project supports increased utilization of geothermal resources in the Western United States by developing basic measurements and interpretations that will assist reservoir management and expansion at Bradys, Desert Peak and the Desert Peak EGS study area (80 km NE of Reno, Nevada) and will serve as a technology template for other geothermal fields. Raw format European Space Agency (ESA) ERS 1/2 satellite synthetic Aperture Radar (SAR) radar scenes acquired from 1992 through 2002 are being processed to

438

Salt Wells Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Salt Wells Geothermal Area Salt Wells Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Salt Wells Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Future Plans 5 Exploration History 6 Well Field Description 7 Research and Development Activities 8 Technical Problems and Solutions 9 Geology of the Area 9.1 Regional Setting 9.2 Stratigraphy 9.3 Structure 10 Hydrothermal System 11 Heat Source 12 Geofluid Geochemistry 13 NEPA-Related Analyses (9) 14 Exploration Activities (28) 15 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: Operational"Operational" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

439

Kilauea Summit Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kilauea Summit Geothermal Area Kilauea Summit Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kilauea Summit Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (12) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

440

Florida Mountains Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Florida Mountains Geothermal Area Florida Mountains Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Florida Mountains Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Molokai Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Molokai Geothermal Area Molokai Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Molokai Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

442

Maui Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Maui Geothermal Area Maui Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Maui Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

443

Rhodes Marsh Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Rhodes Marsh Geothermal Area (Redirected from Rhodes Marsh Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Rhodes Marsh Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase:

444

Jersey Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jersey Valley Geothermal Area Jersey Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jersey Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: near Fallon, NV Exploration Region: Central Nevada Seismic Zone Geothermal Region GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

445

Glass Buttes Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Glass Buttes Geothermal Area Glass Buttes Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Glass Buttes Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (14) 10 References Area Overview Geothermal Area Profile Location: Oregon Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

446

Separation Creek Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Separation Creek Geothermal Area Separation Creek Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Separation Creek Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (1) 10 References Area Overview Geothermal Area Profile Location: Oregon Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

447

Areas Participating in the Reformulated Gasoline Program  

Gasoline and Diesel Fuel Update (EIA)

Reformulated Gasoline Program Reformulated Gasoline Program Contents * Introduction * Mandated RFG Program Areas o Table 1. Mandated RFG Program Areas * RFG Program Opt-In Areas o Table 2. RFG Program Opt-In Areas * RFG Program Opt-Out Procedures and Areas o Table 3. History of EPA Rulemaking on Opt-Out Procedures o Table 4. RFG Program Opt-Out Areas * State Programs o Table 5. State Reformulated Gasoline Programs * Endnotes Spreadsheets Referenced in this Article * Reformulated Gasoline Control Area Populations Related EIA Short-Term Forecast Analysis Products * Demand and Price Outlook for Phase 2 Reformulated Gasoline, 2000 * Environmental Regulations and Changes in Petroleum Refining Operations * Areas Participating in Oxygenated Gasoline Program

448

Kauai Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kauai Geothermal Area Kauai Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kauai Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (1) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

449

Rhodes Marsh Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Rhodes Marsh Geothermal Area Rhodes Marsh Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Rhodes Marsh Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

450

Kawaihae Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Kawaihae Geothermal Area Kawaihae Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Kawaihae Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (6) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

451

Mokapu Penninsula Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Mokapu Penninsula Geothermal Area Mokapu Penninsula Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Mokapu Penninsula Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

452

Socorro Mountain Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Socorro Mountain Geothermal Area Socorro Mountain Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Socorro Mountain Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (10) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

453

Jemez Mountain Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jemez Mountain Geothermal Area Jemez Mountain Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jemez Mountain Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

454

Augusta Mountains Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Augusta Mountains Geothermal Area Augusta Mountains Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Augusta Mountains Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (3) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: Fallon, NV Exploration Region: Central Nevada Seismic Zone Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

455

Marysville Mt Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Marysville Mt Geothermal Area Marysville Mt Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Marysville Mt Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Montana Exploration Region: Other GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

456

Flint Geothermal Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Flint Geothermal Geothermal Area Flint Geothermal Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Flint Geothermal Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: Colorado Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

457

Lualualei Valley Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Lualualei Valley Geothermal Area Lualualei Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Lualualei Valley Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

458

New River Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

New River Geothermal Area New River Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: New River Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (13) 10 References Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

459

Bristol Bay Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Bristol Bay Geothermal Area Bristol Bay Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Bristol Bay Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (1) 9 Exploration Activities (0) 10 References Area Overview Geothermal Area Profile Location: Bristol Bay Borough, Alaska Exploration Region: Alaska Geothermal Region GEA Development Phase: none"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

460

Teels Marsh Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Teels Marsh Geothermal Area Teels Marsh Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Teels Marsh Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (8) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Haleakala Volcano Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Haleakala Volcano Geothermal Area Haleakala Volcano Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Haleakala Volcano Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (7) 10 References Area Overview Geothermal Area Profile Location: Hawaii Exploration Region: Hawaii Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

462

Fort Bliss Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Fort Bliss Geothermal Area Fort Bliss Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fort Bliss Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (22) 10 References Area Overview Geothermal Area Profile Location: Texas Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

463

Jemez Pueblo Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Jemez Pueblo Geothermal Area Jemez Pueblo Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Jemez Pueblo Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (9) 10 References Area Overview Geothermal Area Profile Location: New Mexico Exploration Region: Rio Grande Rift GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

464

Local Area Networks - Applications to Energy Management  

E-Print Network [OSTI]

LOCAL AREA NETWORKS - APPLICATIONS TO MERCY MANAGmNT Advanced BRUCE M. BAKKEN Software bfanager Micro Syatems Corporation Milwaukee, WI ABSTRACT One of the newest advances in computer technology is the Local Area Network. Its many...

Bakken, B. M.

1984-01-01T23:59:59.000Z

465

Navy 1 Geothermal Area | Department of Energy  

Energy Savers [EERE]

Geothermal Area Navy 1 Geothermal Area The Navy 1 Geothermal Project is located on the test and evaluation ranges of the Naval Air Weapons Station, China Lake. At its peak, the...

466

BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION  

E-Print Network [OSTI]

of the 1999 Operable Unit (OU) III Remedial Investigation/Feasibility Study(RI/FS) and was designated as AreaOU III BUILDING 96 RECOMMENDATION FOR SOURCE AREA REMEDIATION FINAL Prepared by: Brookhaven REMEDIATION Executive Summary

467

Utah Geothermal Area | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Utah Geothermal Area Utah Geothermal Area Utah has two geothermal electric plants: the 23-megawatt Roosevelt Hot Springs facility near Milford run by Utah Power and CalEnergy...

468

Casa Diablo Geothermal Area | Department of Energy  

Energy Savers [EERE]

Casa Diablo Geothermal Area Casa Diablo Geothermal Area The Mammoth-Pacific geothermal power plants at Casa Diablo on the eastern front of the Sierra Nevada Range generate enough...

469

Desert Queen Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Desert Queen Geothermal Area Desert Queen Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Desert Queen Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (4) 9 Exploration Activities (1) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northwest Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant

470

Dixie Meadows Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Dixie Meadows Geothermal Area Dixie Meadows Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Dixie Meadows Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (6) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Central Nevada Seismic Zone GEA Development Phase: None"None" is not in the list of possible values (Phase I - Resource Procurement and Identification, Phase II - Resource Exploration and Confirmation, Phase III - Permitting and Initial Development, Phase IV - Resource Production and Power Plant Construction) for this property.

471

Lester Meadow Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Lester Meadow Geothermal Area Lester Meadow Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Lester Meadow Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (3) 10 References Area Overview Geothermal Area Profile Location: Washington Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

472

Mt Ranier Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Mt Ranier Geothermal Area Mt Ranier Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Mt Ranier Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (2) 10 References Area Overview Geothermal Area Profile Location: Washington Exploration Region: Cascades GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content History and Infrastructure Operating Power Plants: 0 No geothermal plants listed. Add a new Operating Power Plant Developing Power Projects: 0

473

Environmental Assessment -- Test Area North pool stabilization project update  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-08-01T23:59:59.000Z

474

Draft environmental assessment -- Test Area North pool stabilization project update  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-06-01T23:59:59.000Z

475

Modelling and optimisation for design of hydrogen networks for multi-period operation  

Science Journals Connector (OSTI)

Hydrogen management is a problem of increasing importance: hydrogen consumption of refineries is rising sharply with additional capacities of hydrocracking and hydrotreating units in order to comply with cleaner fuel specifications. Product Specifications for transportation fuels are becoming increasingly stringent to ensure production of environmentally more benign fuels. Hydrogen management techniques currently do not account for varying operating conditions of hydrogen consuming processes and assume constant operating conditions. A novel approach is developed for the design of flexible hydrogen networks that can remain optimally operable under multiple periods of operation. The proposed methodology for multi-period design of hydrogen networks can take into account pressure differences, maximum capacity of existing equipment, and optimal placement of new equipment such as compressors.

Muhammad Imran Ahmad; Nan Zhang; Megan Jobson

2010-01-01T23:59:59.000Z

476

Considering LEDs for Street and Area Lighting  

Broader source: Energy.gov [DOE]

View Jim Brodrick's keynote video from the September 2009 IES Street and Area Lighting Conference in Philadelphia.

477

Functional Area Qualification Standard Reference Guides  

Broader source: Energy.gov [DOE]

The reference guides have been developed to address the competency statements in DOE Functional Area Qualification Standard.

478

Geographic Information System At International Geothermal Area...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At International Geothermal Area, Indonesia (Nash, Et Al., 2002) Exploration...

479

PHYSICAL OCEANOGRAPHY OF THE TEST AREA  

Science Journals Connector (OSTI)

PHYSICAL OCEANOGRAPHY OF TIIE TEST AREA. PAUL L. HORRER. PROCEDURE. Current Measurements. Methods of determining currents arc varied.

1999-12-23T23:59:59.000Z

480

Surface Spectral Albedo Intensive Operational Period at the ARM SGP Site in august 2002: Results, Analysis, and Future Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Spectral Albedo Intensive Operational Period Spectral Albedo Intensive Operational Period at the ARM SGP Site in August 2002: Results, Analysis, and Future Plans A. P. Trishchenko and Y. Luo Canada Centre for Remote Sensing Ottawa, Ontario, Canada M. C. Cribb and Z. Li University of Maryland College Park, Maryland K. Hamm University of Oklahoma Norman, Oklahoma Introduction A surface spectral albedo Intensive Operational Period (IOP) at the Atmospheric Radiation Measurement (ARM) Southern Great Plains (SGP) site was conducted during August 14-19, 2002, to meet the ARM Program need in a detailed knowledge of surface boundary conditions for atmospheric radiation studies. We measured surface spectral albedos/reflectances for several representative surface types and made a survey of landcover types over an area of approximately 10 km x 10 km centered

Note: This page contains sample records for the topic "area process period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Alternative Formulations for Incorporating Lateral Boundary Data into Limited-Area Models  

Science Journals Connector (OSTI)

Limited-area models (LAMs) use higher resolutions and more advanced parameterizations of physical processes than global numerical weather prediction models, but suffer from one additional source of error—the lateral boundary condition (LBC). The ...

Martina Tudor; Piet Termonia

2010-07-01T23:59:59.000Z

482

Assimilation of Somali Refugees and Immigrants in the Kansas City Area  

E-Print Network [OSTI]

This dissertation investigates the assimilation challenges of Somali refugees and immigrants in the Kansas City area. The process of immigrant assimilation has both economic and socio- cultural dimensions, and the purpose of this project...

Shome, Shimantini

2011-08-31T23:59:59.000Z

483

A landslide risk rating system for the Baguio City, Philippines area  

E-Print Network [OSTI]

This research formulates a LANDSLIDE RISK RATING SYSTEM for the Greater Baguio area in the Philippines. It is hoped that the tool will be made a part of the physical/urban planning process when used by engineers and planners ...

Saldivar-Sali, Artessa Niccola D., 1980-

2004-01-01T23:59:59.000Z

484

CS445E Local Area Networks Rivier College Fall 2006 Rivier College  

E-Print Network [OSTI]

to distributed processing problems. Topics include: layered network architectures, signal transmission analysis, transmission media, data encoding, local and wide area networks, communications architecture and protocols, OSPF, BGP, and others), standards, analog and digital data transmission, transmission media (twisted

Riabov, Vladimir V.

485

Cancer incidence in areas with elevated levels of natural radiation  

Science Journals Connector (OSTI)

It has been reported that on reaching a certain level of cell damage the production of repair enzymes is triggered which decreases the chromosome aberrations. If this happens, prolonged exposure to high levels of natural radiation in areas with elevated levels of background radiation could decrease the frequency of chromosome aberrations. Recent epidemiological studies indicated that there is an increased risk of cancer in healthy individuals with high levels of chromosomal aberrations. Studies performed in Nordic countries as well as Italy, showed that increased levels of chromosome aberrations in lymphocytes can be used to predict cancer risk in humans. One may conclude that a dose of ionising radiation sufficient to produce a certain level of cell damage increases production of antioxidants and repair enzymes that decrease either the frequency of chromosome aberrations or the cancer risk. People in some areas of Ramsar, a city in northern Iran, receive an annual radiation dose from background radiation that is more than five times higher than the 20 mSv. Yr-1 that is permitted for radiation workers. Inhabitants of Ramsar have lived for many generations in these high background areas. If an annual radiation dose of a few hundred mSv is detrimental to health, causing genetic abnormalities or an increased risk of cancer, it should be evident in these people. The absorbed dose rate in some high background radiation areas of Ramsar is approximately 55-200 times higher than that of the average global dose rate. It has been reported that 3â??8% of all cancers are caused by current levels of ionising radiation. If this estimation were true, all the inhabitants of such an area with extraordinary elevated levels of natural radiation would have died of cancer. Our cytogenetic studies show no significant differences between people in the high background area compared to people in normal background areas. As there was no increased level of chromosome aberrations, it may be predicted that the cancer incidence is not higher than in the neighbouring areas with a normal background radiation level. Although there is not yet solid epidemiological information, most local physicians in Ramsar report anecdotally that there is no increase in the incidence rates of cancer or leukemia in their area. There are no data to indicate a significant increase of cancer incidence in other high background radiation areas (HBRAs). Furthermore, several studies show a significant decrease of cancer death rates in areas with high backgrounds. It can be concluded that prolonged exposure to high levels of natural radiation possibly triggers processes such as the production of antioxidants and repair enzymes, which decreases the frequency of chromosome aberrations and the cancer incidence rate.

S.M.J. Mortazavi; M. Ghiassi-Nejad; P.A. Karam; T. Ikushima; A. Niroomand-Rad; J.R. Cameron

2006-01-01T23:59:59.000Z

486

Local control of area-preserving maps  

E-Print Network [OSTI]

We present a method of control of chaos in area-preserving maps. This method gives an explicit expression of a control term which is added to a given area-preserving map. The resulting controlled map which is a small and suitable modification of the original map, is again area-preserving and has an invariant curve whose equation is explicitly known.

Cristel Chandre; Michel Vittot; Guido Ciraolo

2008-09-01T23:59:59.000Z

487

West Central North East Area of Tucson  

E-Print Network [OSTI]

0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson #Individuals Anna Broad-billed Costa Rufous Black-chinned 0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson not be conflicting, and urban areas may actually provide valuable surrogates for degraded habitats. Our knowledge

Hall, Sharon J.

488

THE 2012 KINDER HOUSTON AREA SURVEY  

E-Print Network [OSTI]

ADJUSTED. #12;WHAT IS THE BIGGEST PROBLEM IN THE HOUSTON AREA TODAY? (1982-2012) 51 47 25 1510 36 71 27 10THE 2012 KINDER HOUSTON AREA SURVEY: Perspectives on a City inTransition STEPHEN L. KLINEBERG The GHP-Kinder Institute Luncheon and Release of the Findings, 24 April 2012 #12;KINDER HOUSTON AREA

489

Original article Photosynthesis, leaf area and productivity  

E-Print Network [OSTI]

Original article Photosynthesis, leaf area and productivity of 5 poplar clones during; The stem volume and biomass (stem + branches) production, net photosynthesis of mature leaves and leaf area found in volume production, woody biomass production, total leaf area and net photosynthesis. Above

Paris-Sud XI, Université de

490

1333 day-use recreation area [n] [US] (1)  

Science Journals Connector (OSTI)

recr. (Area which is frequented by ? day trippers [US] /day-trippers [UK]; ? hiking area [US] /rambling area [UK]); s...

2010-01-01T23:59:59.000Z

491

Geothermal br Resource br Area Geothermal br Resource br Area Geothermal  

Open Energy Info (EERE)

Geothermal Area Brady Hot Springs Geothermal Area Geothermal Area Brady Hot Springs Geothermal Area Northwest Basin and Range Geothermal Region MW K Coso Geothermal Area Coso Geothermal Area Walker Lane Transition Zone Geothermal Region Pull Apart in Strike Slip Fault Zone Mesozoic Granitic MW K Dixie Valley Geothermal Area Dixie Valley Geothermal Area Central Nevada Seismic Zone Geothermal Region Stepover or Relay Ramp in Normal Fault Zones major range front fault Jurassic Basalt MW K Geysers Geothermal Area Geysers Geothermal Area Holocene Magmatic Geothermal Region Pull Apart in Strike Slip Fault Zone intrusion margin and associated fractures MW K Long Valley Caldera Geothermal Area Long Valley Caldera Geothermal Area Walker Lane Transition Zone Geothermal Region Displacement Transfer Zone Caldera Margin Quaternary Rhyolite MW K

492

Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.  

SciTech Connect (OSTI)

This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.

Childs, Allen B.

2002-02-01T23:59:59.000Z

493

Region-to-area screening methodology for the Crystalline Repository Project  

SciTech Connect (OSTI)

The purpose of this document is to describe the Crystalline Repository Project's (CRP) process for region-to-area screening of exposed and near-surface crystalline rock bodies in the three regions of the conterminous United States where crystalline rock is being evaluated as a potential host for the second nuclear waste repository (i.e., in the North Central, Northeastern, and Southeastern Regions). This document indicates how the US Department of Energy's (DOE) General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories (10 CFR 960) were used to select and apply factors and variables for the region-to-area screening, explains how these factors and variable are to be applied in the region-to-area screening, and indicates how this methodology relates to the decision process leading to the selection of candidate areas. A brief general discussion of the screening process from the national survey through area screening and site recommendation is presented. This discussion sets the scene for detailed discussions which follow concerning the region-to-area screening process, the guidance provided by the DOE Siting Guidelines for establishing disqualifying factors and variables for screening, and application of the disqualifying factors and variables in the screening process. This document is complementary to the regional geologic and environmental characterization reports to be issued in the summer of 1985 as final documents. These reports will contain the geologic and environmental data base that will be used in conjunction with the methodology to conduct region-to-area screening.

none,

1985-04-01T23:59:59.000Z

494

Ionized impurity scattering in periodically ?-doped InP  

Science Journals Connector (OSTI)

The quantum mobility in the individual minibands of InP with periodic Si ? doping was estimated from the Shubnikov–de Haas spectra of the samples, measured at 4.2 K in fields of 0–14 T. The set of samples studied had a sheet density of Si atoms of about 4.9×1012 cm-2 in each doped layer, and a doping period in the range 90–300 ?. A theoretical model for the quantum mobility in individual minibands was developed, and theoretical estimates of the quantum mobility are in reasonable agreement with the experimental values. It is observed that at a fixed doping period the quantum mobilities increase with the index of the miniband, and the quantum mobility in an individual miniband decreases when the doping period is made shorter. The dependence of the quantum mobility on the miniband index and doping periodicity correlates with the dependence of the mean distance between electrons and the doped layer on the same quantities. These results demonstrate that in ?-doped semiconductors the binding length of the quantum-confined electronic charge is a very important parameter, determining the carrier mobility which can be attained in these systems.

A. B. Henriques, L. C. D. Gon?calves, N. F. Oliveira Jr., P. L. Souza, and B. Yavich

1997-05-15T23:59:59.000Z

495

Updated Conceptual Model for the 300 Area Uranium Groundwater Plume  

SciTech Connect (OSTI)

The 300 Area uranium groundwater plume in the 300-FF-5 Operable Unit is residual from past discharge of nuclear fuel fabrication wastes to a number of liquid (and solid) disposal sites. The source zones in the disposal sites were remediated by excavation and backfilled to grade, but sorbed uranium remains in deeper, unexcavated vadose zone sediments. In spite of source term removal, the groundwater plume has shown remarkable persistence, with concentrations exceeding the drinking water standard over an area of approximately 1 km2. The plume resides within a coupled vadose zone, groundwater, river zone system of immense complexity and scale. Interactions between geologic structure, the hydrologic system driven by the Columbia River, groundwater-river exchange points, and the geochemistry of uranium contribute to persistence of the plume. The U.S. Department of Energy (DOE) recently completed a Remedial Investigation/Feasibility Study (RI/FS) to document characterization of the 300 Area uranium plume and plan for beginning to implement proposed remedial actions. As part of the RI/FS document, a conceptual model was developed that integrates knowledge of the hydrogeologic and geochemical properties of the 300 Area and controlling processes to yield an understanding of how the system behaves and the variables that control it. Recent results from the Hanford Integrated Field Research Challenge site and the Subsurface Biogeochemistry Scientific Focus Area Project funded by the DOE Office of Science were used to update the conceptual model and provide an assessment of key factors controlling plume persistence.

Zachara, John M.; Freshley, Mark D.; Last, George V.; Peterson, Robert E.; Bjornstad, Bruce N.